BIDDING DOCUMENT FOR CIVIL WORKS FOR UNDERGROUND ROCK CAVERNS(PART- A) FOR STARTEGIC STORAGE OF CRUDE OIL PROJECT AT VISAKHAPATNAM, ANDHRA PRADESH(INDIA) OF M/S ISPRL

BIDDING DOCUMENT NO.: 6838/T-167/06-07/RKS/01 TABLE OF CONTENTS (Master Index) S.NO PART – A SECTION A-1.1 A-1.2 A-1.3 A-1.4 A-1.5 A-1.6 A-1.7 A-1.8 SECTION A-2.1 A-2.2

Description Cover Page Table of Contents COMMERCIAL A-1 GENERAL DELTED Letter inviting bids Performa for Acknowledgement letter Special Instructions to bidders Appendix -1 to SITB Appendix-2 to SITB Check-list for bid completion (Commercial) Commercial questionnaire Proposal Forms Schedule of Rate/Quantities A-2 CONDITIONS OF CONTRACT General conditions of Contract Special conditions of Contract - Annexure-I: Time Schedule - Annexure-II: Measurement of works - Annexure-III: Terms of Payment - Annexure-IV: Approval of Construction Sub-contractor

No of Pages 1 2 3 3 16 12 8 5 5 28 17

158 16 8 1

SECTION A-3.1 A-3.2 A-3.3 A-3.4 A-3.5 A-3.6 A-3.7 A-3.8 A-3.9 A-3.10 A-3.11 A-3.12 A-3.13 A-3.14

A-3: PROJECT EXECUTION AND ASSURANCE PLAN Procedure Organization Communication Coordination Meetings Reporting Procurement and sub-contracting Construction management and Supervision Risk Management Planning, scheduling and monitoring Safety, health and Environment Cost Control Contract closing Quality Assurance system

03 02 05 04 05 03 09 12 02 50 66 02 05 17

SECTION

A-4

09

SECTION

A-5 GEOTECHNICAL REFERENCE CONDITIONS

DOCUMENTATION

14

1

S.NO

Description Cover Page Table of Contents

PART-B

BASIC ENGINEERING DESIGN FOR U/G WORKS

70

PART-C SECTION C-1.1 C-1.2 C-1.3 C-1.4 C-1.5 C-1.6

C-1 SCOPE OF WORKS & SUPPLIES Introduction & description Preamble (scope of work) Engineering Construction Facilities Underground Construction Battery Limit & interfaces

08 04 04 10 05 02

C2.1 C2.2 C2.3

C-2 TECHNICAL SPECIFICATION FOR DESIGN AND CONSTRUCTION - FOR U/G WORKS AND STANDARD SPECIFICATIONS TECHNICAL SPECIFICATION MEASUREMENT AND PAYMENT STANDARDS AND SPECIFICATIONS

74 08 190

PART-D

DRAWINGS

29

PART-E E1

REPORTS Geotechnical Factual Report

550

SECTION

No of Pages 1 2