LISTADO DE MANO DE OBRA ARMONIA.ING No.

Código

FACTOR SOBRE COSTO SALARIAL MANO DE OBRA

0.42 P. Unit.

U.

Rend./dia

MA

OP1

OP2

OP3

AY

TC

TNC

Feb-09 SALARIO MENSUAL MIN. RD$

5,100.00

MANO DE OBRA (JORNALES DIARIO) Ayudante (AY) Brigada topográfica, incluyendo equipos Maestro de área (MA) Operario primera categoria (OP1) Operario segunda categoria (OP2) Operario tercera categoria (OP3) Técnico calificado (TC) Técnico no calificado o PEON (TNC)

425.00 4,000.00 975.00 775.00 625.00 550.00 375.00 325.00

M.O. ALBAÑILERIA (COLOCACION BLOQUES) Coloc. Bloque 4 x 8 x 16 pulgs. Coloc. Bloque 5 x 8 x 16 pulgs. Coloc. Bloque 6 x 8 x 16 pulgs. Coloc. Bloque 6 x 8 x 18 pulgs. Coloc. Bloque 8 x 8 x 16 pulgs. Coloc. Bloque 12 x 8 x 16 pulgs. Coloc. Bloque cristal M.O. ALBAÑILERIA(EMPAÑETES, TERM. PAREDES Y PLAFONES) Cantos en vigas, columnas, antepechos y mochetas Careteo con llana Empañete columnas desde 20 cm. Empañete ext. maestrado, a plomo (sin andamios) Empañete HI-RIB, 3 capas Empañete int., en paredes, maestrado, a plomo Empañete pulido sin color Empañete ratedo horiz. Y vertical, punta de llana Empañete techos y vigas Estrias Fraguache con escoba Goteros colgantes Goteros en ranuras Perrilla Repello sin maestrar Resane con goma M.O. ALBAÑILERIA (TERMINACION TECHOS) Fino techo Bermuda, cantos, sin subir mat. Fino techo horizontal, sin subir materiales Fino techo inclinado, sin subir materiles

11.40 8.91 9.50 10.56 10.56 19.44 57.50

33.33 18.18 141.67 96.59 157.50 75.89 82.89 33.93 98.75 62.50 11.59 76.92 66.67 157.50 21.74 27.40

163.46 65.63 40.38

dia dia dia dia dia dia dia dia

u u u u u u u

53.13 500.00 121.88 96.88 78.13 68.75 46.88 40.63

125 160 150 135 135 90 20

m m2 m2 m2 m2 m2 m2 m2 m2 m m2 m m m2 m2 m2

30 55 15 22 10 28 19 42 20 16 69 13 15 10 46 52

m2 m2 m2

13 16 26

1 1 1 1 1 1

1 1 1 1 1 1

1

1 1 1 1 1 1 1

1 1 1 1 1 1

1

1 1 1 1 1 1 1 1

1 1 1

1 1 1

1

1

1 1 1

1 1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1

1

Zabaleta en piso Zabaleta en techo M.O. ALBAÑILERIA (PISOS Y ZOCALOS) Cerámica criolla 30x30 hasta 40x40cm., sin base y nivel Cerámica criolla 30x30 hasta 40x40cm., + base y nivel Coloc. Adoquines Granito 30 x 30 cm. Granito en plumilla Losetas mármol criollo, base y nivel Losetas mármol importado, base y nivel Zócalo granito en piso

23.33 35.00

219.05 267.44 52.27 121.15 150.00 272.73 315.79 52.27

m m

45 30

1 1

1 1

m2 m2 m2 m2 m2 m2 m2 m

5.25 4.3 22 13 10.5 4.4 3.8 22

1 1 1 1 1 1 1 1

m2 m2 m m2

5.25 4 8 44

1 1 1 1

1 1 1 1

10 7 9 1.5

1 1 1 1

1 1 1 1

4 2.5 3.25 2.15

1 1 1 1

1 1 1 1

1.5 1

1 1

1 1

10 8 785 1175 1565

1 1

1 1 1 1

1 1 1 1 1

1

M.O. ALBAÑILERIA (ESCALONES) Escalera en marmol

M.O. ALBAÑILERIA (REVESTIMIENTO PAREDES DE BAÑO) Cerámica criolla 15x15 hasta 20x20 cm Cerámica criolla 30x30 hasta 40x40 cm Mochetas en azulejos Prep. Superficie colocar pisos M.O. ALBAÑILERIA (INST. ACC. DE BAÑOS) Montar accesorios atornillados Montar accesorios empotrados Montar botiquin corriente, sin empotrar Montar botiquin de lujo, sin empotrar

219.05 287.50 143.75 26.14

115.00 164.29 127.78 766.67

u u u u

M.O. ALBAÑILERIA (TRABAJOS EN LADRILLOS)

M.O. ALBAÑILERIA (TRABAJOS EN MARMOL) Mármol criollo en escalera Mármol criollo en revest., paredes Mármol import. En escalera Mármol import. en revest., paredes M.O. ALBAÑILERIA (REGISTROS Y TRAMPA DE GRASA) Conf. Registro hasta 60x60 cm. (medida interior) Conf. Trampa de grasa M.O. ALBAÑILERIA (LABORES VARIAS) Coloc. Caballete de tejas Coloc. Tejas Corte y amarre varilla bloques a 0.20 m Corte y amarre varilla bloques a 0.40 m Corte y amarre varilla bloques a 0.60 m

287.50 460.00 353.85 534.88

766.67 1,475.00

157.50 196.88 1.27 0.85 0.64

m m2 m m2

u u

m m2 u u u

1 1 1 1 1

1 1 1 1 1

1

Corte y amarre varilla bloques a 0.80 m Llenar hueco bloque a 0.20 m Llenar hueco bloque a 0.40 m Llenar hueco bloque a 0.60 m Llenar hueco bloque a 0.80 m M.O. ALBAÑILERIA (SUBIR MATERIALES) Albañileria por cada piso

0.43 3.17 1.71 1.27 0.85

u u u u u

2350 315 585 785 1175

1 1 1 1 1

1 1 1 1 1

0% Segundo Nivel 15% Tercer Nivel 20% Cuarto Nivel 25% Quinto Nivel 30% Sexto Nivel

M.O. CARPINTERIA A TODO COSTO Andamios Cisterna (minimo 10 m2) Columna hasta 0.30 m., c/cara Columna cilindrica 30 cms Dintel hasta 20 x 20 cm Guardera en losa Guardera en platea hasta 20 cm Losa inclinada 1 direcc. Hasta 3 m alt. Losa inclinada 2 direcc. Hasta 3 m alt. Losa inclinada 3 direcc. Hasta 3 m alt. Losa inclinada >3 direcc. Hasta 3 m. alt. Losa plana hasta 2.60 m. alt. Losa plana >2.60 m. hasta 3 m. alt. Losa >3 m. alt. Adic. Por c/..50 m. alt. Hasta 6.00 Viga de amarre hasta .30 mt Viga hasta 0.20 ancho x hasta 0.40 alt. Viga sobre muro hasta 0.30 m. Vuelo plano hasta 2.60 m. alt. Vuelo inclinado losa 1 direc. Hasta 3 m. alt. Vuelo inclinado losa 2 direc. Hasta 3 m. alt. Vuelo inclinado losa 3 direc. Hasta 3 m. alt. Vuelo inclinado losa> 3 direc. Hasta 3 m. alt. Vuelo >3 m. alt. Adic. C/0.50 m. hasta 6.00 m. alt. Precios 2do. Nivel en adelante

42.36 1,871.17 58.32 72.62 137.70 52.95 63.54 160.95 174.79 198.05 317.71 137.70 151.44 20.12 121.81 198.05 137.70 137.70 160.95 174.79 198.05 317.71 20.12

m2 u m m m m m m2 m2 m2 m2 m2 m2 m2 m m m m m m m m m

72 1.63 52.3 42 22.15 57.6 48 18.95 17.45 15.4 9.6 22.15 20.14 151.58 25.04 15.4 22.15 22.15 18.95 17.45 15.4 9.6 151.58

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

10% Segundo Nivel 15% Tercer Nivel 20% Cuarto Nivel 25% Quinto Nivel 30% Sexto Nivel

M.O. DEMOLICIONES

M.O. ELECTRICIDAD Botón timbre

334.28

u

5.91

1

1

1

Interruptor piloto Interruptor 1 Interruptor 2 Interruptor 3 Interruptor 3 vias Interruptor 4 vias Luces Paneles distribución Timbre corriente Tomacorriente 110 v Tomacorriente 220 v

M.O. ELECTRICIDAD (CONEXION APARATOS) Aire acond. Hasta 2 hp (sin materiales) Breakers instalacion Calentador 110 v. sin estar provisto un plot y cordon Calentador 220 v. sin estar provisto un plot y cordon Estufa 220 v. Extractor de aire 110 v. Moledor de desperdicios 110 v. Regulador de intensidad (dimmer) Timbre campana de 4 notas M.O. EXC. Y CORTES CON EQUIPO Corte con pala mecanica en tierra Exc. Caliche a mano 3.00 m. prof. Exc. Caliche a mano 3.01 m - 5.00 m. prof. Exc. Caliche a mano 5.01 m - 7.00 m. prof. Exc. Horm. Armado 3.00 m. prof. Exc. Roca blanda a mano 3.00 m. prof. Exc. Roca blanda a mano 3.01-5.00 m. prof. Exc. Roca blanda a mano 5.01-7.00 m. prof. Exc. Roca compresor 3.00 m. prof. Exc. Tierra a mano 3.00 m. prof. M.O. PINTURA Cornisa De agua 1ra. Mano, p. lisa, masilla, lija y piedra De agua, 2da. Mano, pared lisa De agua, 2 manos p. lisa, masilla, lija, piedra De agua, 1ra. Mano pared RUSTICA De agua, 2da. Mano, pared RUSTICA De agua, 2 manos, pared RUSTICA Imperm. 1ra. Mano, limpieza y sellar grietas Imperm. 2ra. Mano M.O. PLOMERIA (ARRASTRE DOMIC. FUERA C. BAÑO)

358.63 291.88 358.63 451.50 405.04 496.54 291.88 575.00 334.28 291.88 335.60

794.93 66.35 300.12 451.40 451.40 300.12 300.12 240.34 451.40

#¡DIV/0! 331.63 365.17 401.23 844.16 532.79 560.34 613.21

204.40

24.40 28.30 8.70 21.67 30.50 25.62 40.22 20.74 12.20

u u u u u u u u u u u

4.81 5.91 4.81 4.33 4.81 3.94 5.91 3 5.91 5.91 5.14

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1 1 1

u u u u u u u u u

2.17 26 6.5 4.33 4.33 6.5 6.5 8.13 4.33

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

m m2 m2 m2 m2 m2 m2 m2 m2

0.98 0.89 0.81 0.77 0.61 0.58 0.53

1 1 1 2 1 1 1

1.59

1

80.5 107.33 161 64.6 64.4 75.76 34.81 92 161

1 1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1

Arrastre en tub. 2" Arrastre en tub. 3" o 4" Arrastre en tub. 5" o 6" M.O. PLOMERIA (AUMENTO POR PLANTA EN EDIFICIOS) Valor adic. 2da. Planta Valor adic. 3ra. Planta Valor adic. 4ta. Planta Valor adic. 5ta. Planta Valor adic. 6ta. Planta Valor adic. Ma. Y siguientes piso Valor adic. 10ma. Planta M.O. PLOMERIA (BAJANTE O VENTILACION / PLANTA) Bajante o ventilación 2" Bajante o ventilación 3" o 4" Bajante o ventilación 6" M.O. PLOMERIA (BOMBA AGUA, INST. CIRCUITO COMPLETO) Circuito tub. 1/2" o 3/4" Circuito tub. 1" o 1 1/4" Circuito tub. 1 1/2" o 2" M.O. PLOMERIA (BOMBA AGUA, SIN EL CIRCUITO) Circuito tub. 1/2" o 3/4" Circuito tub. 1" o 1 1/4" Circuito tub. 1 1/2" o 2" M.O. PLOMERIA (CALENTADOR DE AGUA EXCLUSIV.) Inst. Calent. Elect. 6-12 gl. Inst. Calent. Elect. 18-50 gl. Inst. Calent. Gas M.O. PLOMERIA (COL. ABASTECER AGUA, POR PLANTA) Tub. H.g. 1/2" o 3/4" Tub. H.g. 1" o 1 1/4" Tub. H.g. 1 1/2" o 2" M.O. PLOMERIA (COL. DESAGUE PLUVIAL, POR PLANTA) Desague pluvial 2" Desague pluvial 3" o 4" Desague pluvial 5" o 6" M.O. PLOMERIA (conexion al septico y filtrante) Septico 1 cam. Y filt. Tub. 4" Septico 1 cam. Y filt. Tub. 5" Septico 1 cam. Y filt. Tub. 6" Septico 1 cam. Y filt. Tub. 8" Septico 2 cam. Y filt. Tub. 4"

8.75 13.33 20.29

m m m

160 105 69

1 1 1

1 1 1

u u u

6.5 4.5 3.5

1 1 1

1 1 1

u u u

0.4 0.3 0.2

1 1 1

1 1 1

u u u

0.8 0.55 0.4

1 1 1

1 1 1

u u u

1.33 1.14 1

1 1 1

1 1 1

u u u

6.5 5.7 5

1 1 1

1 1 1

u u u

6.5 6 4.5

1 1 1

1 1 1

u u u u u

1 0.9 0.8 0.7 0.8

1 1 1 1 1

1 1 1 1 1

5.00%

10.00% 20.00% 20.00% 20.00% 25.00% 35.00% 525.82 601.46 901.58

6,012.16 4,666.67 7,000.00

1,750.00 2,545.45 3,500.00

1,202.00 1,228.07 1,400.00

215.38 245.61 525.82

451.40 525.82 311.11

2,704.74 2,704.74 3,006.08 3,306.20 1,750.00

Septico 2 cam. Y filt. Tub. 5" Septico 2 cam. Y filt. Tub. 6" Septico 2 cam. Y filt. Tub. 8" Conexión cloaca M.O. PLOMERIA (DESAGUE APARATOS, POR SALIDA) Desague 2" Desague 3" y 4" Desague inodoro de pared Desague piso 2", con parrilla Desague piso 3" y 4", con parrilla

u u u u

0.75 0.7 0.6 2

1 1 1 1

1 1 1 1

677.10

u u u u u

5.7 5 4.75 4.75 4

1 1 1 1 1

1 1 1 1 1

466.67

u

3

1

1

752.72

u u

3.33 2.75

1 1

1 1

u u u u

8 8 6.5 5

1 1 1 1

1 1 1 1

u u u u u

6.5 5 4.5 4.4 4

1 1 1 1 1

1 1 1 1 1

u u u u u u u

2 2 2.5 10 6 3 10

1 1 1 1 1 1 1

1 1 1 1 1 1 1

u u u

2.66 2.3 4.7

1 1 1

1 1 1

1,866.67 2,000.00 2,333.33 700.00

525.82 677.10 825.94 601.46

M.O. PLOMERIA (DESMONTAR APARATOS) Desmontar cualquier aparato M.O. PLOMERIA (EMPALME A TUB. AGUA EXIST.) Empalme a tub. 2" M.O. PLOMERIA (EMPALMEA TUB. DRENAJE EXIST.) Empalme a tub. 4" Empalme a tub. 6" M.O. PLOMERIA (INST. LLAVES PASO Y CHORRO) Llave de chorro 1/2" o 3/4" Llave de paso 1/2" 0 3/4" Llave de paso 1" 0 1 1/4" Llave de paso 1 1/2" o 2" M.O. PLOMERIA (INST. TRAMPA DE GRASA Y CAMARA INSP.) Cámara insp. Tub. 2" Cámara insp. Tub. 3" y 4" Cámara insp. Tub. 5" y 6" Trampa de grasa 1 cámara Trampa de grasa 2 cámara M.O. PLOMERIA (MONTAR BAÑERAS Y DUCHAS): Bañera esp. de hierro, tipo "Romano" Bañera liviana Bañera pesada hierro Ducha tipo teléfono Llave empotrada para ducha Mezcladora de baño Terminación baño M.O. PLOMERIA (MONTAR FREGADEROS): Fregadero acero inox. 1 cámara Fregadero acero inox. 2 cámara Fregadero corriente

901.58

677.10 300.12 825.94 1,145.41

215.38 280.00 311.11 1,354.20 2,104.50

1,350.00 901.58 1,654.32 300.12 300.12 525.82 140.00

825.94 1,052.86 752.74

4 4

Trituradora de huesos

1,654.32

u

2

1

1

M.O. PLOMERIA (MONTAR INODOROS): Inodoro dos cuerpos Inodoro especial, 1 cuerpo o pieza Inodoro especial, pared Inodoro fluxómetro o automático

601.46 1,345.20

u u u u

2.5 1.5 1.45 2.25

1 1 1 1

1 1 1 1

u u u u u u u

2.5 1.25 2.25 2 2 1.86 2.5

1 1 1 1 1 1 1

1 1 1 1 1 1 1

u u u u

2.5 5 2 3.34

1 1 1 1

1 1 1 1

u u u u u

4 3.5 3.2 2.85 2.7

1 1 1 1 1

1 1 1 1 1

u u u u

6.5 5 3 6.5

1 1 1 1

1 1 1 1

m m m

100 76 61

1 1 1

1 1 1

20.41 25 35.89 17.86 11.11

1 1 1 1 1

1 1 1 1 1

M.O. PLOMERIA (MONTAR LAVAMANOS Y BIDET): Bidet Lavamanos clínico (unidad conjunto) Lavamanos con patas Lavamanos empotrado Lavamanos pedestal Lavamanos salón de belleza Lavamanos sin pata M. O. PLOMERIA (MONTAR ORINALES): Orinal 1/2 falda Orinal de cemento (terminación) Orinal falda completa Orinal sencillo M. O. PLOMERIA (SALIDAS DE AGUA APARATOS SANIT.) Salida de agua tub. 1/2" o 3/4' Salida de agua tub. 1" Salida de agua tub. 1 1/4" Salida de agua tub. 1 1/2" Salida de agua tub. 2" Salida de agua colgante, pagar 35% del costo M. O. PLOMERIA (TERM. LAVADEROS Y VERTEDEROS): Lavadero 1 cámara Lavadero 2 cámara Vertedero de hierro Vertedero cemento o granito (terminación) M. O. PLOMERIA (TUB. AGUA POTABLE, FUERA C. BAÑO): Tub. Galv. 1/2" o 3/4" Tub. Galv. 1" o 1 1/4" Tub. Galv. 1 1/2" o 2" M. O. PULIMENTO Y BRILLADO PISOS, TODO COSTO (Agregar ITBIS) Cristalizado pisos ( 40 m2 minimo) Limpieza escalón Limpieza zócalo Limpieza, sal y cera Pulimento básico

1,345.20 933.08

901.58 4,509.12 1,052.86 1,052.86 700.00 1,052.86 601.46

677.10 375.76 1,052.86 752.74

350.00 400.00 437.50 491.23 518.52

525.82 825.82 825.94 151.28

14.00 19.52 24.40

68.59 56.00 39.01 78.39 126.01

m2 m m m2 m2

Pulimento escalón Pulimento meseta Pulimento Super chapa Pulimento y cristalizado Pulimento y reparación piso viejo

151.19 138.75 168.07 194.71 209.90

m m2 m2 m2 m2

9.26 10.09 8.33 7.19 6.67

1 1 1 1 1

1 1 1 1 1

qq qq m m m qq qq qq u m m

6.389 7.88 28.75 19.167 28.75 7.889 6.389 9.583 1.325 35.5 28.75

1 1 1 1 1 1 1 1 1 1 1

1 2 1 1 1 2 1 1 2 2 1

1 1 1 1 1 1 1 1 1 1 1

u m m2 m2 m2 u u

2.27 17 2.72 17 2.72 13.6 9.07

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1

M.O. VACIADOS: Vaciado y ligado a mano (ver análisis) Vaciado y ligado con ligadora (ver análisis) M. O. VARILLEROS: Coloc. Acero 1/4" en piso o losa Coloc. Acero alta resistencia Coloc. Acero col. 3/8" o 1/2" hasta 6 de 1/2" Coloc. Acero col. Redonda 6 de 1/2" hasta 4 de 3/4" Coloc. Acero dintel y v. amarre hasta 20x40 y 1/2" o 3/8" Coloc. Acero losa con Lima Hoya o Lima tesa (50% adic.) Coloc. Acero malla electrosoldada Coloc. Acero normal Coloc. Acero rampa escalera corriente Coloc. Acero viga 6 de 1/2" o 3/4" 25 x 40 Coloc. Acero zapata de muros Subir acero techo 2do. Nivel (10%) Trasladar acero distancia > 10 m. ( 10% adicional) M. O. YESO ( A TODO COSTO) Capitel (anillo en columna) Cornisa Panderetas Plafón(directo sobre techo horm.) Plafón en láminas Rosetas 16" Rosetas 24"

280.60 280.60 61.74 92.61 61.74 278.87 277.82 185.22 1,660.38 61.97 61.74 10.00%

1,640.97 219.12 1,369.49 219.12 1,369.49 273.90 410.69

1 1 1 1 1 1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1