Main Street Economic Recovery Plan

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Main Street Economic Recovery Plan as PDF for free.

More details

  • Words: 311,341
  • Pages: 344
The United States Conference of Mayors

Release #4: January 17, 2009

MAINSTREET Community Development, Green Jobs, Transit, Streets/Highways, Airports, Amtrak, Water, Schools, Housing, Public Safety

“Ready to Go” Jobs and Infrastructure Projects

Manuel A. (Manny) Diaz Mayor of Miami President

Tom Cochran CEO and Executive Director

The United States Conference of Mayors

THE UNITED STATES CONFERENCE OF MAYORS Manuel A. (Manny) Diaz Mayor of Miami President

Greg Nickels Mayor of Seattle Vice President

Elizabeth B. Kautz Mayor of Burnsville Second Vice President

Tom Cochran CEO and Executive Director

do your part! please recycle! design: Redshed Creative, www.redshedcreative.com

“READY TO GO” JOBS AND INFRASTRUCTURE PROJECTS America’s Mayors Report to the Nation on Projects to Strengthen Metro Economies and Create Jobs Now Release #4: January 17, 2009 Infrastructure Jobs in Cities – “Ready to Go” Today The U.S. Conference of Mayors releases the fourth in its series of reports on infrastructure projects that are “ready to go” in cities across the nation – projects that meet local infrastructure needs and contribute to local economic development goals, that can be funded quickly through existing federal channels and start quickly when funding is received, and that can generate the significant numbers of jobs that are needed to counter the severe economic problems we face today in our metro areas and our nation as a whole. Today we are reporting that, in 779 cities of all sizes in all regions of the country, a total of 18,750 local infrastructure projects are “ready to go.” These projects represent an infrastructure investment of $149,758,339,126 that would be capable of producing an estimated 1,604,371 jobs in 2009 and 2010. These are the cumulative totals of projects, required funding, and jobs to be created that have been reported in the four surveys of cities conducted by the Conference of Mayors over the past three months. The populations of the 779 cities submitting projects total 77,946,664. The Conference of Mayors MainStreet Economic Recovery plan, developed under the leadership of Miami Mayor Manuel A. (Manny) Diaz, the President of the Conference, calls for federal investments in 10 sectors that will quickly create jobs in metro areas, improve the infrastructure that the private sector needs to succeed, help the small businesses of Main Street America, and produce lasting economic and environmental benefits for the nation. The following chart summarizes, for each of the 10 sectors, the number of infrastructure projects described by the 779 cities, the total investment that would be required to implement these projects, and the estimated number of jobs that they would generate. PROJECTS

FUNDING

Community Development Block Grants

SECTOR

4,028

26,507,901,425

385,256

Energy Block Grants and Green Jobs

1,378

30,604,966,149

151,811

807

11,304,982,392

137,770

4,724

35,954,375,822

433,574

529

5,462,483,130

47,061

Transit Equipment and Infrastructure City Streets/Metro Roads Airport Technology and Infrastructure Amtrak

JOBS

50

1,194,260,000

4,583

Water and Wastewater Infrastructure

4,029

23,494,889,132

271,429

School Modernization

1,066

7,082,502,544

108,336

634

2,474,602,762

25,160

1,505

5,677,375,769

39,391

Public Housing Modernization Public Safety Jobs and Technology

Cities were invited to submit projects that reflected their unique local infrastructure needs, produced jobs for their residents, and contributed to future economic development. Readers of this report should note that some cities were unable to submit estimates of jobs to be created by all of their individual projects. Because this information could not be included in our tabulations, the total job numbers we are reporting for the cities as a group should be considered conservative. Mayors recognize that the economic recovery initiative to be undertaken by the new administration and Congress will include a review process through which projects eligible for funding will be identified. The projects listed in this report in no way represent an inventory of projects formally proposed for funding. Rather, they are examples of the kinds of projects that, if funded through existing channels, would contribute to local infrastructure needs and economic development and to the President-elect’s stated goals for infrastructure revitalization and job creation. All projects received from mayors and cities are included by the Conference in its reports. The mayors and cities responding to the Conference surveys have used their own processes to determine which projects will be submitted, and the responsibility for justifying the individual projects that are put forward resides with them. Documenting the Need for Infrastructure Investment In early November, cities across the nation provided the Conference of Mayors with examples of needed infrastructure projects that could be started quickly and completed in 2009 if additional federal funding were made available for them in any of the 10 MainStreet infrastructure investment sectors. For these projects, the cities gave us their estimates of the amount of funding that would be needed and the number of jobs that would be created. A report describing more than 4,600 projects in 154 cities capable of creating well over a quartermillion jobs was released by the Conference in Washington on November 13. A week after the release of this first report, President-elect Obama stated a goal of creating 2.5 million jobs in America by 2011 – a goal strongly supported by the nation’s mayors. The President-elect described a two-year initiative to rebuild the nation’s crumbling infrastructure. In response, the Conference invited cities to again submit information on infrastructure projects, this time on projects that could start quickly in 2009 and be completed by the end of 2010. The report on this second survey was released in Washington, in a Capitol Hill press conference, on December 8. It listed nearly 11,400 projects in 427 cities that were capable of creating nearly 848,000 jobs – an estimate the Conference considers to be conservative. Immediately following the press conference, a delegation of mayors led by Conference President Diaz met with House Speaker Nancy Pelosi and several Committee Chairs, presented them with copies of the report, and briefed them on the advantages of direct funding of infrastructure projects in cities through existing programs such as the Community Development Block Grant. The mayors’ report and proposal for economic recovery were also discussed in a meeting which followed with Senate Majority Leader Harry Reid, New York Senator Charles Schumer, and Michigan Senator Debbie Stabenow, and with members of the Obama-Biden intergovernmental transition team.

2

The following week, in Chicago, the survey report was included in a mayors’ meeting with President-elect Obama, his designated Assistant for Intergovernmental Relations and Public Liaison, Valerie Jarrett, and his designated Director of Intergovernmental Affairs, Cecilia Munoz. Because the Conference continued to receive requests from cities to contribute to the published examples of “ready-to-go” projects, a third invitation to submit project information was sent to mayors on December 10. Many new cities responded, and many of the cities included in the Conference’s first and second reports submitted additional projects. The Conference’s third report, released December 19, listed well over 15,000 projects in 641 cities capable of producing more than 1.2 million jobs. Responding again to cities’ requests to add projects to the Conference’s growing “ready to go” list, a fourth invitation to submit information was sent to mayors on December 29. As this report shows, the projects added by new cities, along with those added by cities included in the earlier reports, again significantly increased our total estimates of federal infrastructure funding that could be invested and jobs that could be created. A Call to Action – More Urgent Each Day Over the past year, the scope of the economic crisis affecting Main Street America has been well documented and widely reported. As we enter 2009, economic activity continues to slow and the labor market continues to deteriorate. Consumer spending, business investment, and industrial production continues to decline. Problems affecting financial markets and credit conditions remain unresolved. We know that, as the economy weakens and joblessness increases, the current real estate foreclosure crisis can only worsen. The nation’s unemployment rate reached 7.2 percent in December, 2.3 percentage points higher than a year ago. Since the start of the recession in December 2007, the nation has lost 3.6 million jobs. About 11.1 million American workers are now unemployed, another 1.9 million are “marginally attached” to the labor force (meaning that they have looked unsuccessfully for work at some point in the past year), and recent calculations suggest that one in every eight workers is now underemployed. The ranks of the long-term unemployed (those jobless for 27 weeks or more) doubled in 2008, to 2.6 million; claims for unemployment benefits are at the highest level in a quarter-century; and, in many states across the nation, the extended benefits that have been paid to the long-term unemployed will soon be cut off. In today’s world, metro economies drive the national economy, currently accounting for 86 percent of national employment, 90 percent of labor income, and 90 percent of gross domestic product (GDP). It should be obvious that investing in Main Street metro economies is the most direct path to creating the jobs and stimulating the business that can begin to resolve the current economic crisis. Washington has used hundreds of billions of federal dollars to bail out Wall Street, banks, insurance companies and others, and hopes that this investment will eventually be returned to the U.S. Treasury and the taxpayer. It is now time for Washington to make another kind of investment, one that guarantees a return: It is time to initiate MainStreet Economic Recovery – immediate and direct assistance that enables local governments and the private sector to invest in the infrastructure and create the jobs that will help restore this nation’s economic growth.

3

Opponents of economic stimulus spending assert that, because infrastructure projects could take years to start and many more years to complete, investing in them would not have the short-term impact on the economy that is needed. We have documented in this report, however, that there are many thousands of infrastructure projects in cities that can get underway immediately and be completed quickly – within one or two years. As we report, projects in just 779 cities are capable of quickly generating over 1.6 million jobs – more than half of the total three million jobs now sought by the President-elect over the next two years. MainStreet Economic Recovery – Immediate and Direct On October 29, Louisville Mayor Jerry Abramson, a Past President of the Conference, presented the Conference’s initial MainStreet plan to the House Transportation and Infrastructure Committee. On the same day, our Immediate Past President, Trenton Mayor Doug Palmer, presented it to the House Ways and Means Committee. The plan they presented was based on the package of programs for a second economic stimulus that passed the House of Representatives in September but was stopped in the Senate. To that House package we added three needed initiatives: Community Development Block Grant for Infrastructure; Green Jobs – Energy/Environment Block Grant; and Public Safety. In most of the programs, 30 percent or more of the funding would go to the states, with the remainder going to cities and counties – the metro areas that account for the bulk of the nation’s gross domestic product. In the transportation sector, our plan demands that current-law commitments to local areas be preserved in distributing funds under the Surface Transportation Program (STP). It is important to understand that our MainStreet Economic Recovery plan calls for funds to flow quickly and directly to cities through 10 federal funding streams that are already in existence; many of these have demonstrated their effectiveness over many years. The 10 infrastructure investments we are recommending are: •

Community Development Block Grants – CDBG would be used to create jobs through: the construction of public facilities and improvements, water and sewer facilities, streets, and neighborhood centers; the conversion of school buildings for eligible purposes; activities relating to energy conservation and renewable energy resources; and assistance to profitmotivated businesses to carry out economic development and job creation/retention activities.



Energy Block Grants and Green Jobs – The new Energy Efficiency and Conservation Block Grant (EECBG) program would be used by cities, counties, and states to create thousands of energy efficiency and renewable energy production projects. These projects could include energy retrofits of public and private buildings in local areas, installation of solar panels or wind turbines for the production of electricity on local buildings, deployment of new energy distribution technologies (such as distributed generation or district heating and cooling systems) that significantly increase energy efficiency, and development of systems to capture and generate power from methane at landfills.

4



Transit Equipment and Infrastructure – Transit funding would be used to purchase buses, street cars, rail cars, and other rolling stock and equipment needed to create additional capacity; help stabilize fare increases; and improve reliability. It would also be used to restore and maintain facilities and infrastructure in a state of good repair through projects that could, for example, expand station capacity, improve rail tracks, and provide customer information screens.



City Streets/Metro Roads – Highway funding must be distributed through the Surface Transportation Program (STP); this ensures that it will provide maximum flexibility to cities, counties, and states to undertake bridge, bus and rail, and road projects in metropolitan areas.



Airport Technology and Infrastructure – Projects funded through the Airport Improvement Program (AIP) would include runway and taxi rehabilitations, extensions, and widening; obstruction removal; apron construction, expansion and rehabilitation; rescue and firefighting equipment and facilities; airside service or public access roads; and noise mitigation and abatement (Part 150) associated with aircraft operations, including voluntary home buyout, which would fuel the local housing market, and residential and business insulation programs.



Amtrak – Amtrak would use infrastructure funding to make necessary upgrades to tracks, bridges and tunnels, electric traction, interlockings, signals and communications, and stations on the Amtrak system. In addition, Amtrak could refurbish rail cars that are currently in storage and return them to service.



Water and Wastewater Infrastructure – Local governments contribute 98 percent of the total investment in wastewater and 95 percent of the investment in water infrastructure. Water and wastewater infrastructure grants would be used to assist with rehabilitating aging water and sewer infrastructure, complying with sewer overflow issues, and promoting source water protection and availability.



School Modernization – Federal school modernization funds would be used to repair and modernize school buildings in both large- and small-city school districts, improve their energy efficiency, and equip them with first-class technology.



Public Housing Modernization – Public Housing Capital Funds would be used for repair and construction projects, including safety repairs.



Public Safety Jobs and Technology – Providing COPS hiring grants to local police departments would allow them to put additional police officers on the streets and in the schools as school resource officers. Additional Byrne Justice Assistance Grant funding could be used to hire personnel, support those personnel, and purchase equipment and new technologies which make law enforcement personnel more effective in their jobs.

“Ready to Go” Infrastructure Projects For each of our 10 MainStreet infrastructure investment sectors, the following pages list infrastructure projects that are ready to start quickly in 2009 and be completed by the end of 2010 if federal funding is provided. The projects are listed by state and, within state, by city.

5

Survey Cities with 2007 Census Population Estimates Anchorage

AK

279,671

Beverly Hills

CA

34,597

Anniston

AL

23,689

Cathedral City

CA

52,288

Auburn

AL

54,348

Cerritos

CA

51,647

Bessemer

AL

28,657

Chino Hills

CA

74,363

Birmingham

AL

229,800

Citrus Heights

CA

84,469

Decatur

AL

55,741

Compton

CA

94,425

Florence

AL

37,449

Covina

CA

47,251

Gadsden

AL

36,936

Cypress

CA

47,145

Huntsville

AL

171,327

Elk Grove

CA

131,212

Mobile

AL

191,411

Encinitas

CA

59,978

Prichard

AL

27,791

Folsom

CA

67,401

Tuscaloosa

AL

88,722

Fountain Valley

CA

55,471

Fayetteville

AR

72,208

Fresno

CA

470,508

Fort Smith

AR

84,375

Glendora

CA

49,713

Little Rock

AR

187,452

Hayward

CA

140,943

North Little Rock

AR

59,490

Hercules

CA

24,504

Pine Bluff

AR

50,667

Huntington Beach

CA

192,885

Springdale

AR

66,881

Indio

CA

83,937

Avondale

AZ

79,798

Inglewood

CA

113,376

Bullhead City

AZ

40,980

Irvine

CA

201,160

Casa Grande

AZ

38,134

La Mesa

CA

53,990

El Mirage

AZ

26,431

Lakewood

CA

78,956

Flagstaff

AZ

59,746

Livermore

CA

79,532

Gilbert

AZ

207,550

Lodi

CA

61,695

Goodyear

AZ

52,864

Long Beach

CA

466,520

Kingman

AZ

27,696

Los Angeles

CA

3,834,340

Lake Havasu City

AZ

56,603

Manhattan Beach

CA

36,536

Mesa

AZ

452,933

Merced

CA

76,879

Peoria

AZ

146,743

Modesto

CA

203,955

Phoenix

AZ

1,552,259

Napa

CA

74,247

Sahuarita

AZ

16,153

Newark

CA

41,680

Scottsdale

AZ

235,677

Oakland

CA

401,489

South Tucson

AZ

5,598

Ontario

CA

170,936

St. Johns

AZ

3,592

Palm Desert

CA

50,729

Tombstone

AZ

1,562

Pasadena

CA

143,400

Tucson

AZ

525,529

Pittsburg

CA

62,511

Yuma

AZ

88,687

Pleasanton

CA

66,544

Alameda

CA

70,272

Plymouth

CA

1,044

Alhambra

CA

86,352

Rancho Cordova

CA

60,988

Anaheim

CA

333,249

Redding

CA

89,780

Apple Valley

CA

70,322

Redlands

CA

69,941

Bell

CA

36,859

Redondo Beach

CA

67,019

Bell Gardens

CA

44,848

Rialto

CA

98,713

Riverside

CA

294,437

Stamford

CT

118,475

Sacramento

CA

460,242

Stratford

CT

49,015

San Bernardino

CA

199,285

Waterbury

CT

107,174

San Bruno

CA

40,017

West Hartford

CT

60,486

San Diego

CA

1,266,731

West Haven

CT

52,676

San Francisco

CA

764,976

Washington

DC

588,292

San Gabriel

CA

40,602

Wilmington

DE

72,868

San Jose

CA

939,899

Boynton Beach

FL

67,908

San Leandro

CA

77,725

Cape Coral

FL

156,981

San Marcos

CA

78,286

Clearwater

FL

106,642

Santa Ana

CA

339,555

Cocoa Beach

FL

12,021

Santa Barbara

CA

86,204

Coconut Creek

FL

50,321

Santa Cruz

CA

55,322

Coral Gables

FL

42,107

Santa Monica

CA

87,212

Coral Springs

FL

126,875

Santa Rosa

CA

154,241

Doral

FL

22,925

Simi Valley

CA

120,464

Dunedin

FL

36,285

Stockton

CA

287,245

Fort Lauderdale

FL

183,606

Sunnyvale

CA

131,140

Fort Myers

FL

64,258

Sutter Creek

CA

2,732

Gretna

FL

1,602

Temecula

CA

94,767

Hallandale Beach

FL

38,634

Torrance

CA

141,420

Hialeah

FL

212,217

Tracy

CA

79,705

Hollywood

FL

142,473

Turlock

CA

68,133

Homestead

FL

56,601

Ventura

CA

103,219

Jacksonville

FL

805,605

Visalia

CA

118,603

Key Biscayne

FL

9,797

Vista

CA

90,839

Lakeland

FL

92,796

West Sacramento

CA

46,492

Largo

FL

73,298

Arvada

CO

106,328

Lauderhill

FL

67,565

Aurora

CO

311,794

Lauderdale Lakes

FL

31,295

Boulder

CO

93,552

Miami

FL

409,719

Colorado Springs

CO

376,427

Miami Beach

FL

85,036

Denver

CO

588,349

Miami-Dade

FL

2,387,170

Durango

CO

16,007

Miramar

FL

108,240

Englewood

CO

32,532

North Miami

FL

56,185

Greeley

CO

90,306

North Miami Beach

FL

38,201

Lakewood

CO

140,305

Oakland Park

FL

42,151

Merino

CO

273

Orlando

FL

227,907

Rico

CO

246

Palm Bay

FL

100,116

Thornton

CO

110,880

Pembroke Pines

FL

146,828

Bridgeport

CT

136,695

Pinecrest

FL

18,694

Danbury

CT

79,226

Pinellas Park

FL

47,468

Enfield

CT

45,011

Plantation

FL

84,370

Hartford

CT

124,563

Port St. Lucie

FL

151,391

Meriden

CT

59,225

Riviera Beach

FL

36,566

Middletown

CT

47,778

South Daytona

FL

13,840

Naugatuck

CT

31,931

Tallahassee

FL

168,979

New Haven

CT

123,932

Tamarac

FL

59,668

Norwalk

CT

83,456

Tampa

FL

336,823

Tavares

FL

13,661

Meridian

ID

64,642

Wellington

FL

54,479

Montpelier

ID

2,370

West Palm Beach

FL

99,377

Murtaugh

ID

144

Winter Springs

FL

32,961

Newdale

ID

354

Acworth

GA

19,130

Orofino

ID

3,073

Alpharetta

GA

49,662

Paris

ID

494

Athens

GA

100,266

Pocatello

ID

54,572

Atlanta

GA

519,145

Rexburg

ID

27,575

College Park

GA

20,113

Rupert

ID

5,075

Conyers

GA

13,343

Salmon

ID

2,961

Hinesville

GA

30,504

Shelley

ID

4,146

Macon

GA

93,076

Soda Springs

ID

3,098

Marietta

GA

67,021

St. Charles

ID

131

Savannah

GA

130,331

Sugar City

ID

1,521

Hawaii

HI

173,057

Teton

ID

569

Honolulu

HI

375,571

Addison

IL

36,975

Kauai

HI

62,828

Alsip

IL

18,803

Maui

HI

141,783

Alton

IL

29,414

Wailuku

HI

13,543

Amboy

IL

2,579

Davenport

IA

98,975

Arlington Heights

IL

73,693

Des Moines

IA

196,998

Aurora

IL

170,855

Arco

ID

982

Bartlett

IL

41,324

Arimo

ID

315

Blue Island

IL

22,395

Ashton

ID

1,088

Bolingbrook

IL

70,476

Bancroft

ID

347

Bourbonnais

IL

17,942

Bellevue

ID

2,168

Bridgeview

IL

14,973

Blackfoot

ID

10,867

Buda

IL

572

Bloomington

ID

225

Bureau Junction

IL

357

Boise

ID

202,832

Burnham

IL

4,002

Buhl

ID

4,037

Calumet City

IL

37,064

Burley

ID

8,984

Canton

IL

14,581

Council

ID

691

Carbon Hill

IL

409

Crouch

ID

164

Carbon Hill

IL

409

Dayton

ID

440

Carpentersville

IL

37,527

Firth

ID

485

Cedar Point

IL

261

Garden City

ID

11,562

Channahon

IL

13,821

George Town

ID

469

Cherry

IL

492

Glenns Ferry

ID

1,408

Chicago Heights

IL

30,814

Grace

ID

941

Cicero

IL

80,976

Hansen

ID

959

Coal City

IL

5,587

Idaho City

ID

478

Crystal Lake

IL

41,630

Idaho Falls

ID

53,279

Crest Hill

IL

20,463

Jerome

ID

8,827

Dalzell

IL

722

Kellogg

ID

2,227

Depue

IL

1,765

Ketchum

ID

3,234

Diamond

IL

2,348

Lava Hot Springs

ID

486

East Brooklyn

IL

123

Lewiston

ID

31,794

Elgin

IL

104,288

Malad

ID

2,065

Evanston

IL

75,905

Frankfort

IL

17,474

Paw Paw

IL

884

Gardner Glendale Heights

IL

1,465

Peotone

IL

4,246

IL

31,970

Peru

IL

9,803

Glenview

IL

46,329

Princeton

IL

7,526

Glenwood

IL

8,551

Quincy

IL

40,069

Grand Ridge

IL

522

Richton Park

IL

12,886

Granite City

IL

30,683

Riverdale

IL

14,277

Granville

IL

1,352

Romeoville

IL

37,136

Harvey

IL

28,239

Sandwich

IL

7,326

Hennepin

IL

705

Sauk Village

IL

10,336

Hickory Hills

IL

13,381

Schaumburg

IL

72,147

Highland Park

IL

31,457

Seatonville

IL

309

Hoffman Estates

IL

53,145

Seneca

IL

2,108

Homer Glen

IL

25,947

Sheffield

IL

942

Homewood

IL

18,607

Sheridan

IL

2,220

Kangley

IL

272

South Holland

IL

21,235

Kinsman

IL

109

South Wilmington

IL

633

La Salle

IL

9,532

Spring Valley

IL

5,371

Lansing

IL

26,853

Standard

IL

252

Lombard

IL

42,841

Streator

IL

13,795

Lostant

IL

473

Thornton

IL

2,405

Lynwood

IL

7,976

Tinley Park

IL

59,102

Manhattan

IL

6,706

Tiskilwa

IL

756

Manlius

IL

343

Toluca

IL

1,269

Mark

IL

507

Tonica

IL

698

Marseilles

IL

4,894

Troy Grove

IL

302

Matteson

IL

17,080

Varna

IL

417

Mazon

IL

1,003

Verona

IL

256

McNabb

IL

282

Watseka

IL

5,493

Mineral

IL

263

Wenona

IL

1,052

Moline

IL

43,016

West Brooklyn

IL

168

Morris

IL

13,562

Woodridge

IL

34,151

Naplate

IL

514

Worth

IL

10,499

Neponset

IL

497

Wyanet

IL

995

Niles

IL

28,848

Carmel

IN

64,400

Normal

IL

51,716

Crawfordsville

IN

15,066

North Chicago

IL

32,897

Crown Point

IN

23,909

North Utica

IL

1,013

East Chicago

IN

30,151

Northbrook

IL

34,037

Evansville

IN

116,253

Oak Brook

IL

8,797

Fort Wayne

IN

251,247

Oak Park

IL

49,865

Gary

IN

96,429

Oglesby

IL

3,650

Hammond

IN

77,175

Olympia Fields

IL

4,695

Hobart

IN

27,830

Orland Park

IL

55,663

Indianapolis

IN

795,458

Ottawa

IL

19,142

Kokomo

IN

45,902

Palatine

IL

67,317

Lake Station

IN

13,295

Palos Park

IL

4,880

Lawrence

IN

42,736

Park Forest

IL

22,687

Merrillville

IN

32,147

Michigan City

IN

31,851

Dexter

MI

3,300

Mishawaka

IN

49,439

Eastpointe

MI

32,640

Muncie

IN

65,410

Flint

MI

114,662

Plymouth

IN

10,985

Fraser

MI

14,961

Richmond

IN

36,993

Grand Rapids

MI

193,627

St. John

IN

12,302

Grosse Pointe

MI

5,161

Terre Haute

IN

58,932

Grosse Pointe Farms

MI

8,879

Whiting

IN

4,768

Grosse Pointe Woods

MI

15,619

Kansas City

KS

142,320

Jackson

MI

34,022

Lenexa

KS

45,681

Kalamazoo

MI

72,637

Manhattan

KS

51,707

Keego Harbor

MI

2,842

Newton

KS

18,017

Lansing

MI

114,947

Bowling Green

KY

54,244

Livonia

MI

93,931

Frankfort

KY

27,098

Marshall

MI

7,182

Hopkinsville

KY

31,638

Oak Park

MI

30,715

Lexington

KY

279,044

Port Huron

MI

31,083

Louisville

KY

557,789

Portage

MI

46,066

Shelbyville

KY

11,173

Roseville

MI

46,977

Alexandria

LA

45,857

Southfield

MI

75,389

Amite

LA

4,297

Southgate

MI

28,517

Baton Rouge

LA

227,071

St. Clair

MI

5,813

Bossier City

LA

61,801

Sterling Heights

MI

127,349

Monroe

LA

51,208

Taylor

MI

62,374

New Iberia

LA

32,910

Wayne

MI

17,707

New Orleans

LA

239,124

Westland

MI

81,283

Shreveport

LA

199,569

Arden Hills

MN

9,890

Amesbury

MA

12,457

Avon

MN

1,311

Boston

MA

599,351

Belgrade

MN

714

Brockton

MA

93,092

Burnsville

MN

59,118

Chicopee

MA

53,876

Chanhassen

MN

23,720

Haverhill

MA

59,902

Duluth

MN

84,397

Lynn

MA

87,122

Edina

MN

45,912

Malden

MA

55,712

Hanover

MN

2,542

Northampton

MA

28,411

Hugo

MN

12,417

Quincy

MA

91,622

Isle

MN

904

Woburn

MA

37,042

Mahtomedi

MN

7,990

Annapolis

MD

36,603

Melrose

MN

3,150

Baltimore

MD

637,455

Minneapolis

MN

377,392

Lewiston

ME

35,234

Moorhead

MN

35,329

Portland

ME

62,825

New Munich

MN

341

Battle Creek

MI

52,233

Princeton

MN

4,776

Bingham Farms

MI

992

Richfield

MN

33,387

Center Line

MI

8,171

Rosemount

MN

21,004

Clair Shores

MI

60,638

Roseville

MN

32,474

Clawson

MI

12,269

Shorewood

MN

7,577

Dearborn

MI

89,252

Silver Creek

MN

2,270

Dearborn Heights

MI

53,562

St. Augusta

MN

3,272

Detroit

MI

916,952

St. Cloud

MN

66,503

St. Louis Park

MN

44,028

Bozeman

MT

St. Paul

MN

277,251

Staples

MN

3,041

Clayton

MO

Columbia

MO

Ellisville Florissant Jefferson City Kansas City Pine Lawn

MO

4,019

St. Louis

MO

350,759

Wellston

MO

Bay Springs

MS

Belzoni Beulah

37,981

Darby

MT

853

Missoula

MT

67,165

16,076

Shelby

MT

3,417

99,174

Asheville

NC

73,875

MO

9,233

Charlotte

NC

671,588

MO

50,919

Concord

NC

64,653

MO

40,564

Durham

NC

217,847

MO

450,375

Fayetteville

NC

171,853

Gastonia

NC

71,059

Rocky Mount

NC

56,844

2,325

Winston-Salem

NC

215,348

2,182

Grand Forks

ND

51,740

MS

2,418

Lincoln

NE

248,744

MS

437

Omaha

NE

424,482

Biloxi

MS

44,292

Clifton

NJ

78,573

Coahoma

MS

347

East Orange

NJ

65,952

Columbia

MS

6,538

Edison

NJ

102,317

Crenshaw

MS

911

Elizabeth

NJ

124,862

Doddsville

MS

98

Hamilton

NJ

90,365

Friars Point

MS

1,332

Irvington

NJ

59,443

Goodman

MS

1,203

Newark

NJ

280,135

Greenville

MS

36,178

Orange

NJ

31,290

Greenwood

MS

16,151

Piscataway

NJ

52,565

Gunnison

MS

590

Trenton

NJ

82,804

Hattiesburg

MS

50,233

Alamogordo

NM

35,607

Itta Bena

MS

1,892

Albuquerque

NM

518,271

Jackson

MS

175,710

Bayard

NM

2,376

Jonestown

MS

1,573

Espanola

NM

9,549

Laurel

MS

18,405

Las Cruces

NM

89,722

Louise

MS

282

Rio Rancho

NM

75,978

Meadville

MS

496

Santa Fe

NM

73,199

Meridian

MS

38,314

Silver City

NM

9,977

Merigold

MS

606

Henderson

NV

249,386

Morgan City

MS

282

Las Vegas

NV

558,880

Mound Bayou

MS

1,956

Mesquite

NV

15,606

Natchez

MS

16,637

Reno

NV

214,853

Oakland

MS

605

Sparks

NV

87,139

Pace

MS

361

Albany

NY

94,172

Petal

MS

10,617

Binghamton

NY

45,020

Rosedale

MS

2,355

Brighton

NY

34,357

Sidon

MS

563

Buffalo

NY

272,632

Sumner

MS

357

Freeport

NY

42,418

Terry

MS

785

Hempstead

NY

51,785

Tutwiler

MS

1,272

Jamestown

NY

29,557

Webb

MS

501

New Rochelle

NY

73,260

Wesson

MS

1,660

Rochester

NY

206,759

Yazoo City

MS

11,520

Schenectady

NY

61,531

White Plains

NY

57,398

Lancaster

PA

54,672

Akron

OH

207,934

Brook Park

OH

19,388

Philadelphia

PA

1,449,634

Pittsburgh

PA

311,218

Canton

OH

Cincinnati

OH

78,319

State College

PA

39,893

332,458

Wilkes-Barre

PA

41,069

Dayton

OH

155,461

Euclid

OH

47,940

York

PA

40,226

Añasco

PR

30,139

Lakewood

OH

Lima

OH

51,305

Arroyo

PR

19,012

37,936

Barceloneta

PR

23,043

Lorain Marion

OH

70,124

Caguas

PR

142,984

OH

35,686

Camuy

PR

39,370

Mentor

OH

51,739

Ciales

PR

20,572

Milford

OH

6,313

Cidra

PR

47,945

New Bremen

OH

3,033

Corozal

PR

38,839

North Olmsted

OH

31,641

Gußnica

PR

22,800

North Royalton

OH

29,373

Hormigueros

PR

17,524

Parma

OH

78,785

Juana Diaz

PR

52,978

Sidney

OH

20,019

Lares

PR

37,626

Stow

OH

34,051

Las Marias

PR

12,103

Strongsville

OH

42,874

Manati

PR

49,386

Toledo

OH

295,029

Mayagüez

PR

93,730

University Heights

OH

12,753

Moca

PR

44,308

Warren

OH

44,270

Naranjito

PR

29,980

Westlake

OH

30,710

Patillas

PR

20,007

Youngstown

OH

73,818

Ponce

PR

180,376

Zanesville

OH

25,116

Salinas

PR

32,153

Edmond

OK

78,226

San Juan

PR

424,951

Midwest City

OK

55,935

Utuado

PR

34,574

Moore

OK

51,106

Yauco

PR

48,240

Muskogee

OK

40,015

Pawtucket

RI

72,342

Norman

OK

106,707

Providence

RI

172,459

Oklahoma City

OK

547,274

Warwick

RI

85,097

Ponca City

OK

24,590

Woonsocket

RI

43,590

Sand Springs

OK

18,450

Charleston

SC

110,015

Sapulpa

OK

20,908

Columbia

SC

124,818

Tulsa

OK

384,037

Hardeeville

SC

1,930

Corvallis

OR

51,125

Rock Hill

SC

64,858

Eugene

OR

149,004

Sumter

SC

38,782

Gresham

OR

99,721

Rapid City

SD

63,997

Lake Oswego

OR

36,698

Sioux Falls

SD

151,505

Ontario

OR

11,086

Cleveland

TN

39,190

Oregon City

OR

31,086

Germantown

TN

37,317

Portland

OR

550,396

Jackson

TN

63,196

Salem

OR

151,913

Johnson City

TN

61,028

Allentown

PA

107,117

Knoxville

TN

183,546

Bethlehem

PA

72,531

Allen

TX

77,644

Cheltenham

PA

36,875

Arlington

TX

371,038

Harrisburg

PA

47,196

Austin

TX

743,074

Baytown

TX

70,135

West Jordan

UT

102,445

Beaumont

TX

109,579

Bedford

TX

48,985

Alexandria

VA

140,024

Colonial Beach

VA

3,716

Blue Mound

TX

2,361

Brownsville

TX

172,806

Fredericksburg

VA

22,410

Hampton

VA

146,439

Bryan

TX

72,015

Carrollton

TX

123,799

Lynchburg

VA

71,282

Norfolk

VA

235,747

Clarksville

TX

3,508

College Station

TX

80,315

Roanoke

VA

92,600

Virginia Beach

VA

434,743

Dallas

TX

1,240,499

Del Rio

TX

36,582

Burlington

VT

38,531

Auburn

WA

49,808

El Paso

TX

606,913

Euless

TX

52,337

Bellevue

WA

121,347

Bremerton

WA

34,075

Flower Mound

TX

68,337

Fort Worth

TX

681,818

Brewster

WA

2,090

Bridgeport

WA

2,014

Frisco

TX

88,529

Garland

TX

218,792

Cle Elum

WA

1,876

Colville

WA

4,949

Grand Prairie

TX

158,422

Creston

WA

225

Houston

TX

2,208,180

Hurst

TX

38,435

Edmonds

WA

40,139

Everett

WA

98,295

Irving

TX

Killeen

TX

199,505

Fife

WA

7,810

112,434

Kettle Falls

WA

1,572

La Porte

TX

34,261

Laredo

TX

217,506

Kirkland

WA

47,325

Lakewood

WA

57,231

Longview

TX

Lufkin

TX

76,816

Leavenworth

WA

2,269

34,070

Longview

WA

36,638

McAllen

TX

McKinney

TX

127,245

Marcus

WA

163

115,620

Mattawa

WA

3,281

Mesquite Missouri City

TX

131,738

Moses Lake

WA

17,932

TX

74,002

Northport

WA

328

North Richland Hills

TX

64,408

Okanogan

WA

2,352

Pharr

TX

63,681

Pacific

WA

6,011

Port Aransas

TX

3,775

Redmond

WA

49,427

Rowlett

TX

55,541

Renton

WA

60,331

San Antonio

TX

1,328,984

Riverside

WA

327

Tyler

TX

96,451

Seattle

WA

594,210

Waco

TX

122,222

Snoqualmie

WA

7,516

Winnsboro

TX

3,909

Spokane

WA

200,975

Brigham City

UT

18,544

Sumner

WA

9,595

Herriman

UT

16,769

Tacoma

WA

196,520

Holladay

UT

25,527

Tonasket

WA

947

Murray

UT

45,732

Vancouver

WA

161,436

Orem

UT

93,078

Wenatchee

WA

29,810

Provo

UT

117,592

Wilbur

WA

877

Salem

UT

5,903

Winthrop

WA

373

Salt Lake City

UT

180,651

Yakima

WA

82,974

Sandy City

UT

96,074

Yarrow Point

WA

1,053

Taylorsville

UT

58,620

Beloit

WI

36,633


 


Cedarburg

WI

11,056

Big Piney

WY

476

Green Bay

WI

100,781

Janesville

WI

63,012

Casper

WY

53,003

Dixon

WY

80

Madison

WI

Milwaukee

WI

228,775

Elk Mountain

WY

197

602,191

Hanna

WY

862

New Berlin

WI

Racine

WI

39,016

La Barge

WY

446

78,805

Marbleton

WY

919

Sheboygan Superior

WI

48,130

Medicine Bow

WY

267

WI

617

Saratoga

WY

1,737

Waukesha

WI

66,762

Star Valley Ranch

WY

668

Athens

WV

1,180

City

State

Program

Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anchorage Anniston Anniston Anniston Anniston Anniston Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Auburn Bessemer Bessemer

AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AK AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL

Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Public
Safety Public
Safety Public
Safety Schools Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water CDBG CDBG Energy Energy Energy CDBG CDBG CDBG CDBG CDBG Housing Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Airport Airport

Project
Descrip3on Replace
Airport
Terminal
and
Administra3ve
Offices
(Merrill
Field) Connex3on
Day‐Hab
Center Catholic
Social
Services
Building Eagle
River
Town
Center
&
EOC Greenbelt
Trail
Resurfacing
and
Bridge
Repair Harry
J.
McDonald
Center Kids'

Corps
Building Mid‐town
Park Neighborhood
Park
Repairs Mountain
View
Arts
&
Culture
Center Covenant
House
construc3on Loussac
Library Anchorage
Neighborhood
Health
Center DHHS
Building Streetlight
Retrofit
to
Energy‐Saving
LED
Technology Trail
Ligh3ng
Retrofit Municipal
Building
Retrofit
for
Energy
Efficiency Materials
Recovery
Facility
(Recycling
and
Re‐use) Landfill
Methane
Recovery
Project Anchorage
Domes3c
Violence
Preven3on
Project
‐
Vic3m
Outreach Community
Ac3on
Policing
Team
Expansion Misdemeanor/Theb
follow‐up
Unit Mechanical
Upgrades Fire
Alarm
Upgrades Building
Renewal
Projects Intercom/PA
Upgrades Middle
School
Emergency
Communica3on
System Districtwide
Electrical
Projects Districtwide
Security
System
Upgrades Minnesota
Rut
Repair Lake
O3s
&
Tudor
Conges3on
Relief,
final
funding
component Arterial
Rut
Repair
Debarr
Rd./Jewel
Lake
Rd./Pofer
Rd./Old
Klaf
Rd. Old
Glenn
Hwy
Reconstruc3on
Phase
II O'Malley
Road
Reconstruc3on Bus
replacement Regional
Transit
Authority
Funding Public
Transit
System
Security
and
Facility
Improvements Bus
Warm
Storage
for
Expanded
Fleet M&O
Vehicle
Maintenance
Facility Port
of
Anchorage
Expansion
‐
fully
permifed,
ready
to
proceed
immediately,
will
create
1000‐1500
jobs.

 Eagle
River
Wastewater
Treatment
Facility
‐
UV
Disinfec3on
Upgrades Asplund
Wastewater
Treatment
Facility
‐
Generator‐Electrical
Rm
and
SCADA
upgrades Five
Sanitary
Sewer
Lib
Sta3ons
Upgrade Goldenview
Reservoir
(2
million
gallons) Hiland
Road
Water
Inter3e
(Phases
2
and
3) Replace
Hillside
Water
Transmission
Main Coopera3ve
Economic
Development/Job
Crea3on
job
crea3on
ac3vi3es Energy
conserva3on
&
retrofits
schools,
public
buildings Solar
energy
produc3on
‐
public
buildings/schools Coopera3ve
Energy
Projects Abengoa
Solar
designed
100MW
solar
parabolic
trough
electric
genera3on
plant Drainage
Improvements Community
Center
Improvements
 Street
Resurfacing
 Park
Improvements
 Sidewalk
Projects
 Moton
Public
Housing
Demoli3on
 St.
James
Street
Sidewalk Byrd
Street
Sidewalk Outer
Loop
Corridor
Study Alberta/Judd
Drainage
Improvements Cured‐In‐Place‐Pipe
FY09 Cured‐in‐place‐pipe
(CIPP)
stormwater
drainage
rehabilita3on
projects Opelika
Rd
@
Guthrie's
Drainage
Improvements Sanders
St.
Sidewalk N.
Donahue
Bridge
Replacement Ross/Magnolia
Intersec3on S.
College/Longleaf
Dr
Intersec3on Wire
Road
Bridge
Replacement Donahue/Magnolia
Intersec3on
&
Resurfacing Road
Resurfacing
and
Reconstruc3on
‐
Selected
Roads. Miscellaneous
Sewer
Rehabilita3on
Project Airport
Terminal
Sewer
Extension Timberwood
Interceptor
Reinforcement Choctafaula
Interceptor
(Phase
II) U3lity
Asset
Mapping
&
Maintenance
Project Add
1500
feet
of
runway
to
the
exis3ng
main
runway. Electric
Transformers,
ligh3ng
equipment
replacement
and
repair.

Funding
Required Jobs 








15,000,000
 50 












200,000
 5 












600,000
 10 










2,000,000
 20 










3,000,000
 20 










3,000,000
 20 










2,000,000
 20 










3,000,000
 20 










3,000,000
 30 










5,000,000
 40 










5,000,000
 60 








10,000,000
 60 








12,000,000
 80 








12,000,000
 80 










7,000,000
 3 










2,000,000
 8 








10,000,000
 15 








15,000,000
 17 










7,000,000
 20 












318,000
 3 












636,000
 6 












636,000
 6 










1,881,000
 30 












725,000
 40 










1,169,000
 50 












621,000
 50 












820,000
 50 










2,338,000
 60 










2,588,000
 170 








15,000,000
 150 










4,000,000
 180 








20,000,000
 200 








25,000,000
 250 








30,000,000
 300 










7,700,000
 










8,750,000
 12 










2,500,000
 20 








20,000,000
 40 








19,000,000
 40 








75,000,000
 1500 










4,500,000
 100 










6,000,000
 125 










5,300,000
 125 










8,500,000
 125 








16,400,000
 125 








19,500,000
 125 








20,000,000
 180 








28,450,000
 256 








12,000,000
 108 






120,000,000
 1080 






600,000,000
 3200 














85,000
 6 












355,000
 7 












250,000
 14 












425,000
 15 












300,000
 16 












400,000
 30 














32,315
 3 












127,100
 6 












800,000
 6 














70,010
 9 














50,000
 9 










1,000,000
 10 












128,000
 10 












127,000
 10 










1,725,000
 15 














95,000
 15 












745,000
 18 












565,000
 18 












950,000
 20 








10,000,000
 35 












700,000
 15 












400,000
 20 










1,000,000
 22 










3,500,000
 27 










1,500,000
 30 










3,000,000
 12 










3,000,000
 12

City

State

Program

Bessemer Bessemer Bessemer Bessemer Bessemer

AL AL AL AL AL

Airport Airport Airport CDBG CDBG

Project
Descrip3on

Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer

AL AL AL AL AL AL AL AL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Bessemer Bessemer Bessemer

AL AL AL

CDBG CDBG CDBG

Bessemer

AL

CDBG

Bessemer

AL

CDBG

Bessemer Bessemer Bessemer Bessemer

AL AL AL AL

CDBG CDBG CDBG CDBG

Bessemer

AL

CDBG

Bessemer Bessemer

AL AL

CDBG CDBG

Bessemer Bessemer

AL AL

CDBG CDBG

Bessemer Bessemer

AL AL

CDBG CDBG

Bessemer Bessemer

AL AL

CDBG CDBG

Bessemer

AL

CDBG

Bessemer

AL

CDBG

Bessemer

AL

CDBG

Bessemer

AL

CDBG

Bessemer Bessemer

AL AL

CDBG CDBG

Bessemer

AL

CDBG

Bessemer

AL

CDBG

Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer Bessemer

AL AL AL AL AL AL AL AL AL AL AL AL

Energy Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools

Bessemer Bessemer Bessemer

AL AL AL

Streets/Roads Streets/Roads Streets/Roads

Backup
generators
for
main
electrical
system,
GPS,
Computers,
Vehicle
upgrades
and
miscellaneous
equipment
 for
electric
u3lity. Brownfields
Improvements.
Redevelopment
of
Pullman
Standard
Plant.
Cleanup,
Landscaping,
CODE
 improvements,
Infrastructure
Improvements.
Fencing.
Street
resurfacing.
Traffic
Lights.
Ligh3ng. Bio‐diesel
manufacturing
facility. Development
of
methane
produc3on
at
City
landfill. Conversion
of
400
City
Vehicles
to
Natural
Gas. SRT
Mobile
Command
Center. Hire
Public
Safety
Dispatchers. Cold
Case
Unit. Metro
Drug
Task
Force. 30
Patrol
Vehicles
fully
equipped. Fill
vacant
Police
Officer
Posi3ons. Towing
service
and
construc3on
of
facility
for
related
equipment. Purchase
two
ladder
trucks
and
two
rescue
vehicles. Energy
and
internet
infrastructure
improvements
in
City
Schools.
Install
internet
networks.
Replace
windows.
 Insulate.
Replace
HVAC
systems. GIS
mapping
system. Installa3on
of
bridge
guardrails. Avia3on
Road
widening
and
resurfacing
to
create
safe,
efficient
access
to
municipal
airport.

Bessemer Bessemer Bessemer Bessemer

AL AL AL AL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Construc3on
of
Public
Improvements
facility. City
wide
traffic
signal
upgrade. Bridge
Repairs
and
or
replacement

of
six
major
bridges
throughout
the
City. Pave
and
repair
240
miles
of
city
streets.
Roads
of
various
widths.
Project
is
fully
planned
and
ready
for
bid.


Airport
Terminal
Expansion
&
upgrade. Hangar
construc3on
for
general
avia3on. Runway
resurfacing.
And
taxi
way
improvements. Police
Training
Center
Equipment
and
Staffing. Computer
equipment
and
sobware
for
Community
Development
and
Finance
Departments
necessary
to
 maintain
records,
manage
CDBG
funds
and
report
properly. Weed
and
Seed
program
for
at
risk
youth. Demoli3on
Equipment.
Purchase
equipment
for
demoli3on
of
condemned
structures.
 Surveillance
cameras
for
Public
Housing
and
City
wide
in
areas
of
greatest
need. Concord
Landfill
Closure
project. Construc3on
of
Animal
Control
Facility. Residen3al
Energy
Efficiency
Project.
Energy
audits.
Energy
improvements. 4KV
Electric
System
replacement. Completely
renovate
Frank
House
Golf
Course
(Municipal).
Replace
greens.
Landscape.
Public
facili3es. Brownfield
Railroad
bed
and
Bridge
demoli3on
and
removal.
Near
Hwy.
150. Construc3on
of
Police
Training
Facility. Lincoln
Theater‐Complete
historic
restora3on
of
African
American
theater
built
in
1911.
Working
mo3on
 picture
theater.
Performing
Arts
Venu. Public
Park
Improvements.
Hard
Park
Walking
Track
–
ligh3ng,
park
furniture,
equipment.
Parking
lot. Raimond
Heights
Landfill
Opening
project.
Purchase
compactor,
30‐ton
off‐road
truck,
Track
Excavator,
and
 Office
Trailer.
 City
wide
ditch
enclosure
and
sidewalk
construc3on

to
improve
pedestrian
safety. Install
Street
lights,
underground
wiring.
Remove
old
overhead
wiring.
City
Wide. Na3onal
Historic
District
Restora3on
for
mixed
use
business
and
residen3al. Renova3on
of
Cedar
Hill
Cemetery.
(Municipal).
Resurface
streets,
Construct
Shop
Building,
Purchase
Rubber‐ 3re
backhoe. Arlington
School‐Conversion
of
Historic
High
School
to
Housing
for
the
Elderly.
Restora3on
of
500
Seat
Theater.
 29
apartments.
Complete
external
and
internal
Historic
Restora3on.
 New
City
Hall
and
Municipal
Center
with
three
level
parking
deck. Dolonah
Quarry‐Develop
Municipal
Park.
Walking
Trails.
Bicycle
Trails.
Picnic
Areas.
Swimming
Pool.
Boat
Dock.
 Parking.
Park
Ranger
Sta3on.
Ligh3ng,
Amphitheater
,
Basic
Infrastructure.
 Fleet
Maintenance
Facility
construc3on.
Complete
service
facility. Neighborhood
Mini‐Parks
Construct
eight
small
neighborhood
parks,
placed
throughout
the
City.
Four
Parks
 will
be
designed
for
young
children
and
four
parks
will
be
designed
for
older
children.
Basketball
Courts,
 Swings,
Carousels,
etc.
 Construc3on
of
City
Jail
to
replace
41
year
old
facility. Community
Center‐Central
full‐service
center
for
all
ages.
Basketball
courts,
mee3ng
rooms,
tennis,
teaching
 center,
Police
and
Fire
substa3ons Demoli3on
of
blighted,
unsafe
structures.
Remove
500
blighted
houses. Parking
Deck.
Four
story
Municipal
Parking
Deck,
serving
Historic
Downtown
Bessemer,
Jefferson
County
 Courthouse.
 Senior
Community
&
Recrea3on
Center.
Neighborhood
centers
designed
for
elderly
and
disabled.
(Two
 centers). Affordable
Mixed
Income
Housing
Community.
Low
interest
construc3on
loans
to
developers
to
build
100
 housing
units. Auto‐Meter
reading
system
for
City
wide
electrical
system
use. Fes3val
Fields
and
Park
Development
to
construct
a
regional,
recrea3on
and
art
facility
to
host
art
fes3vals
and
 public
gatherings.
Three
city
blocks.
 City
Wide
ADA
Sidewalk
Curb
and
Gufer
improvements. Modify
four
exis3ng
fire
sta3ons.
Construct
one
new
fire
sta3on.
Relocate/Construct
two
fire
sta3ons.


Funding
Required 










3,000,000
 










2,000,000
 










3,600,000
 












400,000


Jobs 20 20 25 2
















31,500
 












750,000
 










1,123,000
 










4,000,000
 












650,000
 










1,000,000
 










2,500,000
 










2,000,000


4 4 10 10 12 12 12 15












7,000,000
 










3,700,000
 












650,000


15 20 20












3,000,000


20














600,000


20












1,490,000
 










3,750,000
 










3,000,000
 










3,000,000


20 24 25 25














400,000


26












2,500,000
 








21,000,000


30 34












5,000,000
 










5,000,000


35 35












1,200,000
 










4,500,000


35 52










16,000,000
 










4,000,000


60 60










16,000,000


60












1,200,000


60












3,000,000


70












5,800,000


70












6,000,000
 








15,000,000


90 100










14,400,000


170












8,500,000


185










12,000,000
 












500,000
 










1,700,000
 










1,200,000
 












250,000
 












240,000
 












500,000
 












500,000
 










1,280,000
 












500,000
 












500,000
 










3,000,000


200 6 10 12 1 4 6 10 12 12 12 18










20,000,000
 












400,000
 












400,000


32 10 12












5,000,000
 










2,200,000
 










4,100,000
 










6,000,000


14 30 35 50










70,000,000


120

City

State

Program

Bessemer

AL

Transit

Bessemer Bessemer Bessemer Bessemer Bessemer

AL AL AL AL AL

Water Water Water Water Water

Transit
system
and
Transit
Center.
Main
transport
throughout
Bessemer.
Routes
to
hospital,
government
offices
 and
major
shopping
facility. Waterline
metering
for
Ross
Bridge
and
Alabaster. Water
system
related
warehouse
upgrades.
Systems
control
upgrade. Well
drilling
for
supplemental
produc3on
and
supply
during
plant
face
down. Vehicle
upgrades
and
pumping
equipment
for
the
water
system. Automa3c
Meter
Reading
System.
GPS
equipment,
GIS.
Replace
exis3ng
manual
metering
system.

Project
Descrip3on

Bessemer Bessemer Bessemer Bessemer

AL AL AL AL

Water Water Water Water

Install
new
storage
tank
for
Alabaster
service
area. Hydrants:
Upgrade,
Repair,
Install
new
water
hydrants
City
wide.
 Security
&
Safety
Equipment
related
to
the
water
system. Treatment
equipment.
Laboratoy
equipment.
Chemicals.
Filtering.
Safety
tes3ng.
UV
protec3on.
EPA.

Bessemer

AL

Water

Various
major
Storm
Water
projects
throughout
the
City
(11
total)


Bessemer

AL

Water

Bessemer Bessemer Bessemer

AL AL AL

Water Water Water

Bessemer Bessemer

AL AL

Water Water

Birmingham Birmingham

AL AL

CDBG CDBG

Pump
Sta3ons
and
Pump
related
upgrades
and
repairs
throughout
the
City
water
system.
SCADA
system
&
 monitors.
Replace
15th
St.
Sta3on. 
Clean,
seal,
refurbish,
and
paint
exis3ng
water
tanks.
Weld
safety
equipment. Resurface
and
widen
Avia3on
Road.
Main
access
to
airport
in
state
of
disrepair. Replace
Old
Water
Supply
Lines
–
6596’
less
than
1”
pipe.
Community
Supply
37,430”
less
than
1.5”.
Bessemer,
 Hueytown,
Lipscomb
–
727,636’
less
than
1.5”
to
2”
pipe. Widen
and
resurface
seven
miles
of
Morgan
Road.
Improve
drainage. Install,
Upgrade,
Repair
water
lines,
both
large
and
small
service
lines.
Install
and
upgrade
metering
 equipment.
Repair,
upgrade
and
install
valve
equipment.
Morgan
Rd.
Lipscomb. Learning
Tree
Park
‐
Ameni3es
(ligh3ng,
furniture,
etc.)
to
enhance
the
use
of
the
park. West
End
Walking
Track
‐
Neighborhood
amenity
to
encourage
walking
as
alterna3ve
mode
of
transporta3on.

Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham

AL AL AL AL AL AL AL AL AL AL AL AL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy

Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham Birmingham

AL AL AL AL AL AL AL AL AL AL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

19th
Street
Ensley
‐
Avenue
F
to
Ensley
Avenue
‐
Street
improvement
project. 30th
Way
North,
4700
Block
‐
Street
improvement
project. City‐wide
neighborhood
sidewalk
ADA
accessibility
improvements. F.
L.
Shuflesworth
Drive,
4300‐4500
Blocks
‐
Street
improvement
project. Florida
Avenue
‐
2nd
Street
to
8th
Street
Thomas
‐
Street
improvement
project. Sandy
Vista
Phase
II
‐
Two
to
three
block
street
improvement
project. Sandy
Vista
Phase
III
‐
Two
to
three
block
street
improvement
project. Sandy
Vista
Phase
IV
‐
Two
to
three
block
street
improvement
project. Wylam
Phase
III
‐
Two
to
three
block
street
improvement
project. 13th
Street
SW
‐
Mayfield
Ave
to
Northland
‐
Street
improvement
project. Park
Lawn
Avenue,
2500
Block
‐
Street
improvement
project. E‐85
Fueling
Facili3es
‐
Construc3on
of
fuel
distribu3on
facili3es
to
make
E‐85
fuel
available
city‐wide
for
the
 City's
fleet
vehicles. 8th
Avenue
North
‐
Streetscape
improvements
from
Center
Street
to
3rd
Street
N. 19th
Avenue
N
‐
Street
widening
improvements
from
East
Lake
Blvd
to
88th
Street
North. City‐wide
ADA
curb
ramp
installa3on 6th
Street
NW
‐
Street
widening
improvements
from
Five
Mile
Road
to
Carson
Road Grants
Mill
Road
Bridge
‐
Bridge
replacement. Mar3nwood
Lane
‐
Street
widening
improvements
from
Wildwood
Dr
to
Hillview
Dr. City‐wide
infrastructure
repairs
‐
Sidewalks,
ligh3ng,
etc. City‐wide
street
resurfacing City‐wide
bridge
repairs Intermodal
Facility
Expansion
‐
Parking
Deck
‐
Parking
deck
to
support
the
use
of
mul3modal
facility.

Birmingham Birmingham Birmingham Decatur

AL AL AL AL

Water Water Water CDBG

Pafon
Park
Aera3on
System
‐
Aera3on
system
to
aerate
lake
to
prevent
algae
growth. Bridlewood
Ditch
‐
Concrete
box
culvert
project
to
improve
drainage. Oak
Ridge
Phase
II
‐
Sanitary
sewer
to
serve
an
unsewered
area
of
Birmingham. Ingalls
Boat
Harbor
piping
inlets
curbing
and
paving
for
restroom
bldg
parking
lot
and
highway
20
turn
lane

Decatur

AL

CDBG

Burleson
Moun3an
off‐site
Sanitary
Sewer

Decatur

AL

CDBG

Reto
fit
sidewalk
program
throughout
the
city

Decatur

AL

CDBG

Decatur

AL

CDBG

Decatur Decatur Decatur Decatur

AL AL AL AL

Energy Streets/Roads Streets/Roads Streets/Roads

Sewer
extension
down
Alabama
State
Highway
67
(Beltline
Road)
to
Alabama
State
Highway
24
(Gordon
Terry
 Parkway) Stonegate
Single
Family
residental
subdivision
interstructure
project
building
of
street
curb,
gufer
u3lity
 upgrade Retro
fiqng
city
hall
for
engergy
efficiency
and
ADA
compliance Buningtree
Connec3on
Summerwind
to
Tomahawk
Trail
extension Castlegate
Blvd
extension
from
Presbyterian
Dr
to
the
Mall Burningtree
Dr.
improvements
pipe
inlets
curbing
from
Old
Creek
Trail
to
Cherokee
Place

Decatur Decatur Decatur Decatur Decatur Decatur

AL AL AL AL AL AL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

Chapel
Hill
Road
Improvements Phase
2
and
Phase
3
of
City
Widing
Resurfacing
project Judge
Crow
Blvd
connec3ng
Auburn
Dr
and
Modaus
road Old
Moulton
Road
Improvements
from
West
Moulton
to
Highway
67
 Highway
20
interchange Purchase
20
40‐passenger
buses
for
local
transporta3on
route
throughout
city
to
local
industry

Decatur Decatur Florence

AL AL AL

Water Water Streets/Roads

Gadsden Gadsden Gadsden

AL AL AL

Airport Airport CDBG

Moulton
Heights
Sewer
Extension
Project Flint
sewer
rehab
project.
replace
sewer
lines
to
parts
of
city
with
sewer
problems This
project
will
construct
the
College
Street
Bridge
in
West
Florence,
a
low
income/high
poverty
area,
to
open
 development
in
this
area
of
the
City. ARFF
Crash
Truck Airport
Fire
Sta3on‐modify
exis3ng
building Hoke
Street
Sidewalk
Construc3on
to
serve
new
Department
of
Human
Resources
Facility

Gadsden

AL

CDBG

Construc3on
of
Banks
Park
Community
Center

Funding
Required

Jobs












7,500,000
 












125,000
 










1,000,000
 










2,200,000
 










1,100,000


32 6 9 9 13












4,929,000
 










2,100,000
 












570,000
 












780,000


15 15 25 27












1,025,000


32










15,000,000


44












2,250,000
 










4,477,000
 










5,800,000


55 61 90










25,553,000
 










7,500,000


95 120










35,500,000
 












200,000


140 30














500,000
 










1,600,000
 












550,000
 










4,000,000
 












150,000
 












500,000
 












500,000
 












250,000
 












200,000
 












500,000
 












300,000
 














50,000


30 50 50 50 50 50 50 50 50 50 75 75














550,000
 












900,000
 












350,000
 








12,000,000
 












500,000
 










1,000,000
 










1,300,000
 










1,000,000
 








30,000,000
 










1,000,000


50 40 50 50 75 75 75 100 150 220












8,000,000
 












500,000
 










1,200,000
 










1,500,000


200 15 50 75














325,000


15














350,000


25












3,000,000


30












5,500,000


45












1,500,000
 










2,000,000
 












700,000
 












325,000


75 20 10 10














550,000
 










2,500,000
 










2,271,000
 










4,000,000
 










8,000,000
 








50,000,000


15 20 30 50 100 400












5,000,000
 










5,000,000
 










7,000,000


30 85 100












4,500,000
 












700,000
 












300,000


50 6 10














150,000
 












600,000


5 20

City

State

Program

Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Gadsden Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville

AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Housing Housing Public
Safety Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Energy Energy Energy

Historic
Downtown
Lob
Conversions Rose
Street
Drainage Miscellaneous
Street
Resurfacing Renova3on
of
Gadsden
Sports
Complex Tuscaloosa
Avenue
Drainage Oak
Park
Drainage Oakleigh
Estates
Road
&
Drainage
Improvements Conversion
of
former
General
Forrest
School Green
Roof
Conversions Energy
Retrofit
of
Historic
Downtown
Municipal
Buildings Emma
Sansom
Homes‐safety‐related
repairs Starnes
Park
Housing
Construc3on‐10
new
units Construct
and
equip
forensic
lab Miscellaneous
Computer/Technology
Upgrades Electrical
&
Telecommunica3ons
Op3miza3on
Program Equipment
for
New
Career
Tech
Center
at
new
Gadsden
City
High
School South
11th
Street
Widening Tuscaloosa
Avenue
Bridge
Replacement Black
Creek
Parkway
Signaliza3on
&
Turn
Lanes Chestnut
Street
Bridge
Replacement ADA
required
sidewalk
modifica3ons Miscellaneous
Road
Improvements 4‐Laning
of
Airport
Road
to
serve
new
plant Replacement
of
large
trolleys
with
smaller,
environmentally
friendly
trolleys Construc3on
of
trolley
stops/sta3ons Lookout
Mountain
Water
&
Sewer
Installa3on Miscellaneous
Water
&
Sewer
Replacement North
Gadsden
Water
&
Sewer
Replacement Airport
Road
Water
&
Sewer
Installa3on
to
serve
new
plant Lowe
Mill
and
Terry
Heights
Neighborhood
Parks Clinton
Avenue
Streetscape
Improvement Food
Co‐op/Grocery
Store
for
Terry
Heights
Neighborhood Ligh3ng
and
Repaving
Public
Parking
Lots Holmes
Avenue
Bridge
Replacement Clinton
Avenue
Bridge
Replacement Meridian
Street
Improvements
Phase
II Courthouse
Square
Improvement
Project Infrastructure
and
Drainage
Improvements:
Terry
Heights
and
Lowe
Mill
Neighborhoods Neighborhood
Stabiliza3on:
Terry
Heights
and
Lowe
Mill
Neighborhoods 3
Parking
Garages Natatorium
Back
Pa3o
Renova3on Library
HVAC
and
Chiller
Retrofit Hays
Preserve
Building‐
New
Green
LEED
Building New
Green
LEED
Goldsmith
Schiffman
Preserve
Building Greenbrier
Fire
Sta3on Alterna3ve
(Rapid)
Fueling
Sta3on Green
Cove
Fire
Sta3on Brahan
Spring
Park
Landscape
Management
Facility Energy
Efficiency
Upgrades
to
Calvary
Hills
and
West
Side
Neighborhood
Recrea3on
Centers


Project
Descrip3on

Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville

AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL

Energy Energy Energy Housing Housing Housing Housing Housing Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

North
Huntsville
Public
Safety
Facility
 LED
Traffic
Signaliza3on
and
Incandescent
Ligh3ng
Improvements
 New
Energy
Efficient
Fleet
Building Replacement
of
ligh3ng
at
various
sites Roofing
at
various
sites Replacement
of
bathroom
fixtures
at
various
sites Repain3ng
units
at
various
sites Installa3on
of
energy
efficient
windows
at
various
sites Rehabilita3on
of
150
mul3family
units Construc3on
of
Gateway
Place
senior
housing
facility Crime
Preven3on
through
Crime
Analysis
Program‐Sobware
purchase Mobile
Repor3ng
Program‐
Replacing
225
police
in‐car
mobile
data
terminals Mobile
Video
Program‐Installa3on
of
175
in‐car
mobile
video
systems Safety
Advancement
for
Everyone
(S.A.F.E.)
Program‐Purchase
of
equipment
and
training Fill
vacant
police
officer
posi3ons East
Side
Recrea3onal
Facility South
Side
Recrea3onal
Facility West
Side
Recrea3onal
Facility Big
Cove
Elementary
School Lee
High
School
 Local
Public
School
Moderniza3on/IT
Upgrade/Energy
Conserva3on Lake
Four
Repairs
at
Research
Park Providence
Main
Street
Streetscape Flint
River
Greenway
Phase
II Stonemark
Infrastructure
Improvements Taylor
Road
Extension Extension
of
Big
Cove
Rd
to
Big
Cove
Creek Balch
Road California
Street
Bridge
Project

Funding
Required Jobs 












500,000
 20 












750,000
 20 










1,000,000
 25 












750,000
 25 










1,000,000
 25 










1,200,000
 30 










2,000,000
 40 










3,000,000
 60 












500,000
 15 










4,000,000
 75 












200,000
 5 












800,000
 15 










1,000,000
 5 










2,000,000
 20 










2,000,000
 30 










3,000,000
 50 












350,000
 5 












750,000
 15 












250,000
 20 












200,000
 20 










1,000,000
 30 










6,000,000
 60 










6,000,000
 700 












800,000
 5 












900,000
 15 










2,000,000
 30 








10,000,000
 70 








12,000,000
 80 










2,000,000
 700 










1,000,000
 47 










1,500,000
 70 










1,500,000
 70 










1,500,000
 70 










2,000,000
 95 










2,500,000
 120 










2,600,000
 120 










2,873,000
 135 








10,000,000
 470 








12,000,000
 565 








40,000,000
 1880 












200,000
 10 












400,000
 20 












750,000
 35 












750,000
 35 










1,660,000
 75 










1,700,000
 80 










1,700,000
 80 










2,000,000
 100 










2,000,000
 










2,200,000
 










5,000,000
 










5,000,000
 












500,000
 










3,000,000
 










1,700,000
 










2,700,000
 










4,500,000
 








12,000,000
 








16,000,000
 














65,000
 










1,020,000
 










1,050,000
 












350,000
 












875,000
 










3,000,000
 










4,000,000
 










4,000,000
 








22,000,000
 








45,000,000
 








50,000,000
 












600,000
 










1,000,000
 










1,500,000
 










1,500,000
 










1,500,000
 










2,000,000
 










2,500,000
 










2,500,000


100 105 235 235 25 50 80 125 200 560 750 0 0 0 0 17 140 190 190 1030 2100 2350 30 47 60 70 70 95 120 120

City

State

Program

Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville

AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL AL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville

AL AL AL AL AL AL AL AL AL AL AL

Transit Transit Transit Transit Transit Transit Water Water Water Water Water

Franklin
Street
Bridge
Project Galla3n
Street
Bridge
Project Madison
Street
Bridge
Project Taylor
Lane
Widening Townsend
Street
Bridge
Project Explorer
Blvd
Extension Old
Madison
Pike
Improvements Nance
Road
Improvements Road
Extension
Research
Park Beadle
Lane
Improvements Church
Street
Bridge
Project Jeff
Road
Widening Hobbs
Island
Bridge
Project Lifle
Cove
Road
and
Lifle
Cove
Greenway Dug
Hill
Road/US
431
Intersec3on
Improvements Mar3n
Road
Bridge
Project Resurfacing
various
streets Governors
Drive
Phase
II Mar3n
Road
Widening
(Redstone
Gate
to
West
of
Wall
Triana
Highway) Infrastructure
Improvements
for
Redstone
Arsenal
EUL
 Memorial
Parkway
South
Overpass
(Byrd
Springs/Lily
Flagg/Mar3n
Rd)
for
Improved
Mobility
to
Redstone
 Arsenal Procure
15
transit
buses
with
alterna3ve
fuel
capability

 Replace
2
trolley
buses
@
$250,000
each Updated
Transit
Center
Message
Board Install
15
bus
camera
systems
@$5000
each Replace
bus
stop
signs
and
bus
maps Install
25
bus
shelters
@
$5000
per
shelter County
Line
Road
Sewer
Extension Flint
River
Sewer
Extension Sewer
Abatement
Infrastructure
Projects Big
Cove
Sewer
Rehabilita3on Chemical
Root
Control
Applica3on
for
Spring
Branch
and
Aldridge
Creek
Sanitary
Sewer
Basins

Project
Descrip3on

Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville

AL AL AL AL AL AL AL

Water Water Water Water Water Water Water

Knox
Creek
Sewer
Extension Sanitary
Sewer
Rehabilita3on:
Test
and
Seal
Chemical
Grou3ng Logan/Vermont
Pump
Sta3on
Upgrade Spring
Branch
WWTP
‐
Digester
Upgrade Sanitary
Sewer
Rehabilita3on:
Sanitary
Sewer
Evalua3onSurveys
(SSES)
 Sanitary
Sewer
Rehabilita3on:
Cured
In
Place
Pipe
Installa3on
 Sanitary
Sewer
Rehabilita3on:
Manhole
Rehabilita3on
for
Spring
Branch
&
Aldridge
Creek
Service
Basins

Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Huntsville Mobile

AL AL AL AL AL AL AL AL AL AL AL AL AL

Water Water Water Water Water Water Water Water Water Water Water Water Airport

Mobile

AL

CDBG

Mobile

AL

Energy

Mobile

AL

Energy

Ware
Park
Sewer
Project Restore
Historic
Big
Spring
Park
Drainage
Basin
 Sanitary
Sewer
Rehabilita3on:
Line
Replacement Western
Area
Forcemain
Phase
III Western
Area
Interceptor
Phase
IV Western
Area
Pump
Sta3on
Phase
II Sanitary
Sewer
Rehabilita3on:
Pipe
Burs3ng Western
Area
16"
Forecemain
Phase
VI Western
Area
Interceptor
Phase
V Flood
Mi3ga3on
and
Drainage
Improvements Sewer
Capacity
Assurance
Program
and
Expansion Redstone
Arsenal
EUL
Sewer
 The
City
of
Mobile
partners
with
our
Airport
Authority
for
two
major
airports.
Mul3ple
infrastructure
projects
 for
upgrades
and
moderniza3on
to
support
buildings
and
roadways. 
City
of
Mobile:
Mobile
Housing
Board
(MHB):
44
projects
including
construc3on
and
improvements
of
public
 facili3es,
streets,
and
neighborhood
centers;
and
assistance
to
businesses
for
economic
development
and
job
 crea3on/reten3on.
 City
of
Mobile:
Mobile
Gas
Corp:
Main
reloca3on
and
renewal
for
the
EADS/Northrop
Grumman
facili3es
that
 will
be
built
on
the
Brookley
Industrial
Complex.

 The
City
of
Mobile
and
Alabama
Power
Company,
(A
Southern
Company),
"Re‐powering
an
Electric
U3lity
Coal
 Unit
with
100%
Biomass"‐
including
the
primary
electrical
genera3ng
facility
for
Mobile,
the
Barry
Steam
Plant.

Mobile

AL

Energy

Mobile

AL

Public
Safety

Mobile

AL

Public
Safety

Mobile

AL

Schools

Mobile

AL

Streets/Roads

City
of
Mobile:
Mobile
Gas
Corp:
Mul3ple
Reloca3on,
Renewal,
Refurbishment
Projects
to
maintain
and
 upgrade
exis3ng
gas
transfer
infrastructure. City
of
Mobile:
Police:
add
local
forensic
laboratory
capabili3es,
upgrade
IT
capabili3es,

support
the
NIBIN‐ Na3onal
Integrated
Ballis3c
Informa3on
Network,
assist
the
Na3onal
Security
Entry‐Exit
Registra3on
System
 with
a
Mobile
Police
Interstate
 City
of
Mobile:
Fire‐Rescue:
Renova3on/
replacement
for
aging
facili3es;
Equipment
upgrades/
replacement;
 Add
staff
and
training
for
exis3ng
needs;
New
facili3es,
equipment,
and
staff
for
recently
annexed
areas. City
of
Mobile:
Mobile
County
Public
School
System:
for
the
Survey
period
(2009‐2010),
we
have

sixty‐four
 (64)
school
facility
projects
ranging
from
minor
to
total
renova3on,
school
addi3ons
and
new
schools
“ready‐to‐ go”.

 City
of
Mobile:
Replacement
of
67
year
old,
224
b
Michigan
Avenue
Bridge,
and
other
highway
related
capital
 improvements.

Funding
Required Jobs 










2,500,000
 120 










2,500,000
 120 










2,500,000
 120 










2,500,000
 120 










2,500,000
 120 










3,000,000
 140 










3,841,000
 180 










4,000,000
 190 










4,000,000
 190 










5,000,000
 235 










5,000,000
 235 










5,000,000
 235 










6,000,000
 280 










6,500,000
 300 










7,100,000
 330 








10,000,000
 470 








10,000,000
 470 








11,000,000
 520 








20,000,000
 940 








50,000,000
 2350 








53,000,000
 










3,750,000
 












500,000
 














15,000
 














75,000
 














25,000
 












125,000
 












630,000
 












735,000
 












750,000
 












800,000


2400 0 0 0 3 5 6 30 35 35 40














800,000
 












787,500
 












800,000
 










1,000,000
 










1,000,000
 










1,200,000
 










1,400,000


40 40 40 47 47 55 65












2,300,000
 










2,126,000
 










3,000,000
 










3,500,000
 










3,916,500
 










4,095,000
 










4,011,000
 










4,200,000
 










4,200,000
 










4,242,000
 










4,645,000
 










5,500,000
 










7,000,000


100 100 140 165 185 190 190 200 200 200 220 260 330












2,180,000


123










18,000,000


216














500,000


120








100,000,000


193












2,941,300


441










15,571,000


135










86,750,000


1000








360,000,000
 24375 










6,240,000


138

City

State

Program

Mobile

AL

Transit

City
of
Mobile:
Wave
Transit:
expand
exis3ng
services,
increase
headway
frequencies,
add
services
to
the
 newest
steel
produc3on
plant
now
under
construc3on
in
the
U.S.,
ThyssenKrupp
Stainless
USA,
LLC.

Project
Descrip3on

Mobile

AL

Transit

Mobile

AL

Water

Mobile

AL

Water

Mobile

AL

Water

Mobile

AL

Water

Mobile

AL

Water

Mobile

AL

Water

City
of
Mobile:
Waterfront
Terminal
Complex,
Mobile
Landing
Mari3me
Transporta3on
Center,
includes
hub
 terminal
for
high
speed
passenger
ferry
service
for
bay
area
communi3es. City
of
Mobile:
PWD:
Drainage
Infrastructure:
Bayou
Street
Underground
Drainage
System
Rehabilita3on
and
 Improvements. City
of
Mobile:
PWD:
Drainage
Infrastructure:
Concep3on
Street
Underground
Drainage
System
Repairs
and
 Improvements. City
of
Mobile:
PWD:
Drainage
Infrastructure:
Ice
House
Branch
Phase
II:
Channel
Improvements
from
 Bankhead
Street
to
200’
south
of
Senator
Street.

 City
of
Mobile:
PWD:
Drainage
Infrastructure:
Lifle
S3ckney
Phase
IV:

Underground
and
Concrete
Culvert
 Drainage
Improvements. City
of
Mobile:PWD:
Drainage
Infrastructure:
Carlisle
Drive
Phase
IV
‐
Channel
Improvements:
Overlook
to
 Carlisle
Drive. City
of
Mobile:
PWD:
Drainage
Infrastructure:
Florida
Street
Phase
II:
Underground
Drainage
Improvements
.

Mobile

AL

Water

Mobile

AL

Water

Mobile

AL

Water

Prichard Prichard Prichard Prichard Prichard Prichard Prichard Prichard Tuscaloosa

AL AL AL AL AL AL AL AL AL

CDBG CDBG Energy Public
Safety Public
Safety Streets/Roads Water Water Streets/Roads

Tuscaloosa

AL

Streets/Roads

Tuscaloosa

AL

Streets/Roads

Tuscaloosa

AL

Water

Tuscaloosa

AL

Water

Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville

AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Amtrak CDBG CDBG CDBG CDBG CDBG CDBG Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

City
of
Mobile:
PWD:
Drainage
Infrastructure:
Government
Street
Drainage
Improvements
Phase
IV:
Road
 Widening
and
Drainage
Improvements. City
of
Mobile:
Board
of
Water
and
Sewer
Commissioners:
Mul3ple
projects
ranging
from
repair
and
 rehabilita3on
to
full
replacement
of
exis3ng
gravity
sanitary
sewer
infrastructure
to
combat
sanitary
sewer
 overflows
(SSOs),
upgrades
to
sanitary
sewer
li City
of
Mobile:
Public
Works:
19
infrastructure
projects
directly
related
to
rehabilita3ng
aging
water
and
sewer
 infrastructure,
complying
with
sewer
overflow
issues,
and
promo3ng
source
water
protec3on. Public
Recrea3on
Facili3es
‐
Infrastructure
expansions
and
upgrades Downtown
Revitaliza3on Sanita3on,
Solid
Waste
and
Landfill
Development Police
Department
Facili3es
upgrades,
expansions
and
new
euipment. Fire/Rescue
Facili3es
upgrades,
expansion
and
new
equipment. Citywide
Infrastructure
Expansion
and
Upgrade 158
Coridor
Water
&
Sewer
Line
Expansion Citywide
Water
&
Sewer
System
Upgrades Greensboro
Avenue
Revitaliza3on
Project
‐
This
seven
block
corridor
is
an
area
that
the
City
is
trying
to
reverse
 declining
land
use
values.

The
proposed
project
is
designed
to
increase
private
investment
and
decrease
crime
 in
the
area.

 Hinton
Park
Road
Reloca3on
‐
This
project
will
relocate
an
exis3ng
road
that
runs
through
the
middle
of
a
large
 inner
City
park
to
the
eastern
boundary
of
the
park.

Reloca3on
of
the
road
will
enhance
pedestrian
safety
in
 the
park
and
an
adjoining
elementary
school Loop
Road
Phase
3
‐
This
is
the
final
phase
of
road
improvements
to
Loop
Road
in
eastern
Tuscaloosa.

The
 road
will
be
widened
to
two
12
foot
lanes
with
curb
and
gufer
and
sidewalks.

The
exis3ng
side
drainage
 ditches
will
be
piped
and
covered.
 North
Regional
Sewer
Pump
Sta3on
‐
This
sta3on
will
serve
the
metropolitan
area
north
of
the
river.

The
 regional
pump
sta3on
will
serve
areas
around
Lake
Tuscaloosa,
thus
elimina3ng
the
need
for
sep3c
tanks
in
 exis3ng
and
new
homes. Woodland
Forest
Drainage
Project
‐
Constant
flooding
in
the
heavily
residen3al
area
of

Woodland
Forest
will
 be
minimized
when
this
project
is
complete.

This
project
will
emphasis
"green
techniques"
in
solving
the
 drainage
problem
in
the
area. Install
High
Intensity
Runway
Ligh3ng Remove
Obstruc3ons
(trees)
South
end
approach
zone Rehabilitate
Runway
pavements Rehabilitate
Taxiway
pavements Widen
Taxiways
B,
C
and
F
from
40'
to
50' Construct
Aircrab
Maintenance
Facility
100X200 Construct
Taxiway
G
from
Taxiway
E
to
South
Runway
End Construct
Terminal
Apron
Expansion
300X600 Construct
West
side
Firehouse
for
Crash
Truck
and
Structure
truck Purchase/Develop
Aerospace
and
Technology
Park
+
167
Acres Terminal
Apron
Rehab Construct
20
GA
Sunscreens
&
Tie
down
Apron
Complex Construct
6
ea
60X60
Corporate
Hangars
w/parking Construct
East
Side
Business
Apron
300X1200 Runway
16
RSA
Improvement
Project
(AIP
in
progress) Feasibility
Study
‐
Lifle
Rock
to
Fayefeville energy
conserva3on
‐
non‐profit
facili3es rehab
for
non‐profit
facility target
area
street
&
sidewalk
improvements target
area
water
and
sewer
improvements expansion
of
community
center rehab
for
resource
center Expand
Morgan
manor
‐
two
8‐unit
facili3es Rehab
PHA
High
Rise Radio
System
Upgrade Taser
Purchase Civilian
Crime
Analyst Motorcycle
Traffic
Patrol School
Resource
Officers Parks
and
Trail
patrol 4th
Judicial
District
Drug
Task
Force

Funding
Required

Jobs










13,000,000


10










52,000,000


700














300,000


20












1,400,000


30












1,100,000


30












2,500,000


30












1,200,000


30












2,500,000


35












4,000,000


45








178,310,000


320










36,000,000
 








11,280,000
 






249,114,977
 








12,500,000
 








11,168,750
 








14,000,000
 






358,574,000
 








22,500,000
 








50,000,000


1400 27 510 300 33 51 1400 500 500












4,000,000


50












3,000,000


60












2,500,000


60












3,000,000


50












5,000,000
 










1,000,000
 














10,000
 












200,000
 












250,000
 












425,000
 










2,000,000
 










2,900,000
 










2,850,000
 










1,250,000
 










3,500,000
 












350,000
 










1,200,000
 












400,000
 










5,700,000
 










4,000,000
 












250,000
 












400,000
 












500,000
 












900,000
 












800,000
 










1,000,000
 










1,000,000
 










5,000,000
 










1,000,000
 










4,000,000
 














83,700
 












150,000
 












150,000
 












241,000
 












317,570
 












470,000


70 5 5 10 10 10 25 25 25 25 25 25 40 40 50 50 5 3 4 4 4 10 10 5 20 0 0 2 2 4 5 10

City

State

Program

Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fayefeville Fort
Smith Fort
Smith

AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG CDBG

Fort
Smith Fort
Smith Fort
Smith

AR AR AR

CDBG CDBG CDBG

Fort
Smith Fort
Smith

AR AR

CDBG CDBG

Fort
Smith Fort
Smith Fort
Smith

AR AR AR

CDBG Streets/Roads Streets/Roads

Fort
Smith Fort
Smith Fort
Smith

AR AR AR

Water Water Water

Fort
Smith

AR

Water

Fort
Smith Fort
Smith Fort
Smith Fort
Smith

AR AR AR AR

Water Water Water Water

Fort
Smith Fort
Smith Fort
Smith Fort
Smith Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock

AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Water Water Water Water Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport

Project
Descrip3on AR
112
Hwy
Widening
(UofA
Agri
to
I‐540) Van
Asche
Extension
)Gregg
to
Hwy
112) U.S
71B
Safety
Enhancements(College
Avenue) U.S.
71B/Joyce
Street
intersec3on
improvements AR
16
Hwy
Widening
(Hwy
265
to
Falcon) Fulbright
Expressway/Gregg
Street
Interchange
Improv. Joyce
Street
Extension
to
I‐540 U.S.
71B/Fulbright
Expressway
Interchange
Improv. AR
112
Hwy
Widening
(I‐540
to
Johnson
City
Limits) New
I‐540/Joyce
Street
Interchange AR
265
Hwy
Widening
(Joyce
to
Albright) I‐540/Fulbright
Expressway
Interchange
Improv. Replace
Meter
Vault,
U
of
A
Farms
East
on
Garland Paint
Baxter
Water
Tanks Benson
Mountain
Pressure
Plane
Water
Storage
Tank South
Mountain
Water
Pump
Sta3on
Repair
&
Replace Water
Line
Replacement
‐
Lafayefe,
West‐College Water
Loop,
Holland
Dr
(Farmington) Water/Sewer
Installa3on
on
Shiloh,
North
of
Dorothy
Jeanne Sewer
Lib
Sta3on
Backup
Power
Generators Water
Line
Replacement
‐
Hwy
16E
White
River
Bridge Sewer
Line
Replacement
‐
Crossover,
Cliffs
to
36"
Transmission Sewer
Line
Replacement
‐
Happy
Hollow,
4th
to
36"
Transmission Sewer
Replacement
‐
Elkins
Ouzall
Line Water
Line
Replacement
‐
Dinsmore
Trail Water
Line
Replacement
‐
Holly
&
Sang
Area Water
Line
Replacement
‐
Jackson,
Kings,
Columbus Water
Line
Replacement
‐
Overcrest
&
Mockingbird
Area Innova3ve
Biosolids
Processing
Method Construc3on
of
new
playground
at
Tilles
Park
for
physically‐challenged
children Construc3on
of
new
sidewalk
on
Albert
Pike
Ave.
from
Grand
to
Spradling
and
repair
exis3ng
sidewalk
on
May
 Ave. Repairs
to
sidewlaks
on
Lecta
Ave.,
North
13th
St.,
North
7th
St.,
North
5th
St. Construc3on
of
mul3‐purpose
trail Development
of
4
neighborhood
parks
‐
Texas
Road,
Leo
Fondren,
Briarcliff,
Williamson
Place Construc3on
of
new
restroom
facili3es
in
an
LMI
area
park Reconstruc3on
of
single
family
homes
occupied
by
eligible
households
that
have
founda3on
or
other
major
 failures Cost
share
in
subdivision
project
for
LMI
home
construc3on
with
$6
million
leverage Reconstruc3on
of
0.9
miles
of
Texas
Rd.
south
of
Cavanaugh
Rd. Construc3on
of
1500
feet
of
Chad
Colley
Blvd.
in
the
Chaffee
Crossing
redevelopment
area
to
support
 industrial
growth Wastewater
Supervisory
Control
and
Data
Acquisi3on
System Disposal
of
Water
Treatment
Plant
residuals Construc3on
of
deten3on
pond
and
drainage
channel
improvements,
Hon
Avenue
north
of
Park
Ave. Construc3on
of
Neighborhood
Storm
Drainage
Improvements
in
3
areas:
Barrington
Lane/Hillsboro
Lane;
 Dallas
and
96th
Street;
Ballman
Road Midland
Avenue
30‐inch
Water
Transmission
Line
Construc3on Sub‐Basin
10
Wastewater
Collec3on
System
Rehabilita3on Neighborhood
Water
System
and
Fire
Protec3on
Improvements Construc3on
of
drainage
improvements
in
Mill
Creek
from
Cavanaugh
Rd.
downstream
to
South
28th
St.
and
 realignment
of
South
28th
St.
with
U.S.
Highway
71B Sunnymeade
Basin
Relief
Sewer
‐
Phase
2 Sunnymeade
Basin
Relief
Sewer
‐
Phase
3 Lake
Fort
Smith
Water
Treatment
Plant
Backwash
Lagoon
Expansion Lake
Fort
Smith
Water
Treatment
Plant
4
million
Gallon
Clearwell
Storage Airport
Safety
‐
Enhance
Emergency
Response
Items Enhance
Terminal
Security/Surveillance
System Flight
Informa3on
Display
System Wildlife
Mi3ga3on
Efforts Westside
Run‐up
Pad Pave
Radar
Road Remove
and
Repave
Surface
Parking
Lots Replace
Taxiway
Kilo Replace
Taxiway
Lima Airport
Draining
‐
Northeast
Quadrant Airport
Draining
‐
Southwest
Quadrant Inline
Baggage
Screening
System Pedestrian
Bridge Perimeter
Security
System Renovate
Airport
Fire
Sta3on Runway
Safety
Area
Enhancement Complete
Airport
Perimeter
Road Extend
Taxiway
Charlie Replace
Taxiway
Bravo Replace
Taxiway
Charlie Replace
Taxiway
Delta Replace
Taxiway
Papa

Funding
Required Jobs 










3,000,000
 12 










4,000,000
 12 










6,300,000
 18 










5,500,000
 18 










9,000,000
 20 








10,000,000
 20 










7,500,000
 20 








12,000,000
 20 








15,000,000
 22 








14,500,000
 22 








22,000,000
 30 








76,000,000
 200 














46,000
 4 












644,000
 5 












161,000
 6 












207,000
 6 














56,350
 6 












507,150
 6 












263,350
 6 












460,000
 8 












520,950
 8 










1,721,550
 15 










1,452,450
 15 










1,742,250
 15 










1,130,450
 15 










1,429,450
 15 










1,135,050
 15 










1,179,900
 15 










8,000,000
 25 














40,000
 5 












300,000
 












274,000
 












150,000


5 5 6














426,000
 












200,000


12 15














300,000
 












500,000
 










4,000,000


25 30 25












1,500,000
 












600,000
 












450,000


30 8 10














600,000


12














200,000
 










3,570,000
 










1,500,000
 










3,400,000


12 15 15 16












4,000,000
 










1,500,000
 










1,800,000
 










3,500,000
 










4,400,000
 












600,000
 












400,000
 












180,000
 












300,000
 












500,000
 












500,000
 










1,000,000
 










1,500,000
 










1,500,000
 










2,000,000
 










2,500,000
 










2,500,000
 










1,500,000
 










2,300,000
 










2,000,000
 












500,000
 










3,000,000
 










3,000,000
 










4,500,000
 










3,500,000
 










3,500,000
 










4,000,000


20 20 20 23 40 5 10 10 10 15 25 25 25 25 35 35 35 35 40 45 50 75 75 75 75 75 75

City

State

Program

Lifle
Rock Lifle
Rock

AR AR

Airport Public
Safety

Terminal
Renova3on Fiber
Op3c
Network
Backbone
on
Arterial
Network
(Traffic
Control
and
Video
Surveillance)

Project
Descrip3on

Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock Lifle
Rock

AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water

Arkansas
River
Trail Baseline
Road
‐
Stagecoach
to
County
Line
(widening
and
overlay) Bowman
Road
bridge
widening Chenal
Parkway‐Shackelford
to
Highway
10
(Overlay) Chester‐Markham‐Roosevelt
(Overlay) Fourche
Dam
Pike
&
Lindsey
Road
Signal Geyer
Springs
‐
65th
to
Baseline
Road I‐440
&
Bankhead
Signal I‐440
&
Fourche
Dam
Pike
Ligh3ng
and
Signaliza3on Markham‐I‐30
to
Chenal
(Overlay) Rahling
Road
‐
Chenal
to
Taylor
Loop
(Widening
and
Overlay) Rahling
Road
Widening South
Loop Springer
&
I‐440
(Ligh3ng) Taylor
Loop/Rahling
and
Hinson
Signaliza3ons Thibault
Road
(Zuber
to
Frazier)
Widening University
‐
Cantrell
to
Asher
(Overlay) Wright
Avenue
Viaduct
(Overpass) Pumping
Plant
ImprovementsNew
Bar
Screen
‐
Jamison
Road
P.S. Pumping
Plant
ImprovementsReplace
Wet
Well
Covers
Jamison
PS Pumping
Plant
Improvementsz:
Woodland
Ridge
Pump
Sta3on
Telemetry Pumping
Plant
Improvements:
New
Bar
Screen
‐
Jamison
Road
P.S. Pumping
Plant
Improvements:
Woodland
Ridge
PS
Improvements Infiltra3on/Inflow
Analysis
to
iden3fy
areas
with
wet‐weather
overflows Sewer
Treatment
Plant
Improvements General
Plant
Facili3es
and
Equipment
 Fourche
Creek
Treatment
Plant
Engine
Generator
Replacement:
Principal
power
supply
at
Fourche
Creek
 Treatment
Plant
is
through
three
digester‐gas
burning
engines,
each
coupled
to
electrical
generators.



Lifle
Rock Lifle
Rock

AR AR

Water Water

Elimina3on
of
Community
Service
Lines
on
36
proper3es Trenchless
sewer
line
rehabilita3on
is
for
the
renewal
of
structurally
deteriorated
line
segments
that
contribute
 to
non‐capacity
overflows.

Trenchless
methods
include
Cured
in
Place
Pipe
(CIPP)
and
Pipe
Burs3ng.


North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock North
Lifle
Rock Pine
Bluff

AR AR AR AR AR AR AR AR AR AR AR AR AR AR AR

Airport Airport Airport CDBG Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Airport

Terminal
Building Runway
Extensions Runway
5
&
23
Widening Redwood
Drainage
System
Improvements Officers
and
Equipment Pike
Avenue
Roundabout
(New
Construc3on) West
9th
Street
Extension
(New) Main
Street
Viaduct
(Renova3ons) Main
Street
Improvements Highway
167
Access
Road
(New) Fairfax
Rail
Cross
Bridge
(New) Trolley
Barn
Expansion New
Buses Wastewater
Improvements Grider
Field
Road
Improvements
‐
This
project
provides
street
and
design
improvements
to
Hangar
Row
Road,
 Thomas
Riggins
Road
and
Grider
Field/Ladd
Road.
The
project
involves
the
realignment
and
improvement
of
 approximately
400
feet
of
Hangar
Row
Road.


Pine
Bluff

AR

Airport

Pine
Bluff

AR

Airport

Pine
Bluff

AR

Airport

Pine
Bluff

AR

Airport

Aircrab
T‐Hangar,
Phase
II
‐
Construc3on
of
a
new
hangar
will
allow
the
placement
of
eight
aircrab
in
the
 facility
and
therefore
freeing
up
room
in
our
general
storage
hangars
for
more
aircrab
to
locate
at
Grider
Field. Airport
Fire
&
Emergency
Services
Substa3on
‐
Fire
and
Emergency
Services
has
iden3fied
the
need
for
a
fire
 sub‐sta3on
at
the
Pine
Bluff
Municipal
Airport.
This
sub‐sta3on
will
allow
the
Pine
Bluff
Fire
Dept.
 Airport
Terminal
Building
Renova3on
‐
The
city
plans
to
renovate
the
airport’s
terminal
building
to
improve
 handicap
accessibility,
energy
efficiency,
passenger
accommoda3ons,
and
its
afrac3veness
to
businesses
 seeking
to
locate
near
the
airport. Grider
Field‐Ladd
Road
/
Osborn
Road
Project
‐
This
project
involves
widening
these
roads
to
four‐lane
roads.
It
 also
involves
reloca3ng
a
por3on
of
the
Grider
Field
Road
(new
construc3on)
so
it
lines
up
with
Osborn
Road.

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Fire
Department
Ladder
Truck
‐
The
city
requests
assistance
in
replacing
its
aging
stock
of
fire
trucks,
reducing
 the
city's
ISO
ra3ng.
A
reduc3on
of
one
point
results
in
a
savings
of
$100
per
homeowner
per
year. Eco‐Tourism
Development
for
Bayou
Bartholomew
‐
The
city
seeks
to
develop
tourism
around
1.78
mile‐long
 nature
trail
along
this
eco‐tourism
afrac3on.

 Management
Systems
Technology
‐
 Replacement
of
the
30‐year‐old
financial
management
system
with
an
integrated
financial,
human
resources,
 and
city
services
management
system,
resul3ng
in
greater
efficiency
and

heightened
system
security. Walker
Lake
Project
‐
This
project
involves
construc3ng
a
small
dam
and
spillway
in
order
to
retain
suitable
 water
levels.
The
project
will
also
minimize
any
poten3al
of
adverse
environmental
impacts
on
nearby
 residences.
 Olive
Street
Sidewalk
Project
‐

This
project
involves
the
construc3on
of
a
sidewalk
on
the
west
side
of
Olive
 Street
between
28th
Avenue
and
39th
Avenue.

 Downtown
Sidewalks
‐
Sidewalks
in
need
to
be
rehabilitated
to
improve
handicapped
accessibility
and
to
 create
a
more
pedestrian‐friendly
environment.
This
project
supports
the
City’s

downtown
revitaliza3on
 efforts.

Funding
Required 






465,000,000


Jobs 400












5,300,000
 








15,000,000
 










1,200,000
 












700,000
 










3,000,000
 












670,000
 












300,000
 












610,000
 














60,000
 












500,000
 










3,200,000
 










2,940,000
 












750,000
 










5,100,000
 












850,000
 












250,000
 












380,000
 










1,300,000
 












670,000
 














16,000
 














25,000
 














25,000
 












225,000
 












250,000
 












949,000
 












982,175
 










1,192,620


3 3 10 11 13












1,276,146
 










2,133,163


14 24












3,180,000
 










1,200,000
 










1,360,000
 










1,700,000
 








18,000,000
 












650,000
 












750,000
 










1,200,000
 










1,000,000
 










2,000,000
 










9,000,000
 








10,000,000
 








18,000,000
 










1,400,000
 








14,000,000


35 13 15 18 169 10 8 13 14 28 96 107 1 3 131














498,240


0














575,000


10














934,225


40












2,100,000


54












5,200,000


75














720,000


0














100,000


3














330,000


3
















40,000


6














400,000


7














380,000


10

City

State

Program

Pine
Bluff

AR

CDBG

Project
Descrip3on

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

CDBG

Pine
Bluff

AR

Energy

Pine
Bluff

AR

Energy

Pine
Bluff

AR

Public
Safety

Pine
Bluff

AR

Public
Safety

Pine
Bluff

AR

Streets/Roads

Pine
Bluff

AR

Streets/Roads

Pine
Bluff

AR

Streets/Roads

Pine
Bluff

AR

Streets/Roads

Pine
Bluff

AR

Streets/Roads

Former
Armory
as
Youth
Services
Center
‐
Funds
to
update
and
renovate
a
US
Army
Reserve
Armory
that
has
 been
donated
to
the
City
to
serve
as
a
family
and
community
services
center.
 Pifs
Drainage
Project
‐
Elimina3on
of
flooding
condi3ons
and
reconstruc3on
of
three
bridges
at
street
 loca3ons. Removal
of
Dilapidated
Housing
and
Acquisi3on
‐
Dilapidated
housing
units
that
are
beyond
repair
will
be
 demolished,
leading
to
decreased
criminal
ac3vity,
improved
neighborhood
housing
values,
and
quality
of
life
 of
nearby
residents. City
Water
Park
‐
This
project
involves
the
construc3on
of
a
recrea3onal
water
afrac3on
for
youth
and
 families.
 Reconstruc3on
of
Street
Department
Compound
‐

Reconstruc3on
of
this
1938
facility
will
allow
for
a
safe
 office
environment
for
employees
and
provide
a
modern
facility
for
maintenance
of
equipment
and
city
 vehicles.

 Reloca3on
of
Fire
Sta3on
‐
Construc3on
of
a
new
sta3on
in
order
to
meet
all
applicable
ADA
and
other
federal,
 state
and
local
codes. Renova3on
of
Police
Facility
‐
 Renova3on
of
a
donated
facility
entails
roof
repairs,
window
replacements,
new
HVAC
system,
plumbing
 repairs
and
electrical
and
technology
upgrades. Energy
Efficiency
Emergency
Rehabilita3on
‐
This
project
involves
making
weatheriza3on
improvements
to
the
 exis3ng
housing
stock
for
the
elderly
and
low‐to‐moderate
income
residents.

 Mul3purpose
Recrea3onal
Center
‐
 The
facility
will
offer
a
range
of
free
and/or
modest
cost
recrea3onal
programs
to
the
general
public.
 Bank
and
Shoreline
Stabiliza3on
‐
Bank
stabiliza3on
is
needed
along
the
southern
and
western
shorelines
of
 Lake
Saracen
prior
to
trail
construc3on
for
Phases
III
and
IV.

 Willow
Street
and
Jean
Superblock
Project:
Reconstruc3on
of
five
city
streets.
to
support
affordable
housing
 development. Municipal
Court
‐
The
city
is
in
need
of
a
new
facility
for
its
municipal
court
in
order
to
deal
with
an
increased
 number
of
offenders.
The
city
had
to
add
a
second
municipal
judge,
however,
there
is
only
one
courtroom
 available. Housing
Rehabilita3on/
Reconstruc3on
‐
Abandoned
and
dilapidated
housing
units
will
be
rehabilitated,
 leading
to
decreased
criminal
ac3vity,
improved
neighborhood
housing
values,
and
quality
of
life.
 Elevator
Equipment
Replacements
‐
 The
city
will
install
energy
efficient
elevator
equipment
in
all
three
buildings
in
the
Pine
Bluff
Civic
Center
 Complex.
 Lights
for
Walking
Trail
‐
The
city
is
reques3ng
funds
to
install
solar‐powered
character
ligh3ng
along
a
walking
 trail
to
make
it
safe
and
appealing
to
residents
and
tourists
during
evening
hours.
 LAN
Technology
–
The
city
seeks
to
develop
a
local
area
network
for
its
Civic
Center
Complex
as
well
as
upgrade
 key
hardware
and
sobware. GIS
Technology
‐
The
city
of
Pine
Bluff
seeks
to
integrate
data
pertaining
to
infrastructure,
land
use,
public
 safety,
environmental,
and
other
uses
using
GIS
technology.
 Bryant
Street
Widening
Project
‐
 This
project
involves
widening,
reconstruc3ng,
and
installing
curbs‐and‐gufers
to
increase
safety
for
the
 traveling
public
and
improve
access
from
I‐530
to
the
Dollarway
Road
commercial
corridor. Harding
Avenue
Widening
Project
‐
 This
project
involves
widening
Harding
Avenue
to
reduce
traffic
conges3on
and
enhance
commercial
 development
along
the
Harding
Corridor
located
between
Main
Street
and
the
Pines
Mall. Hazel
Street
Widening
Project
‐
Widening
Hazel
Street
to
a
five‐lane
street
between
Interstate‐530
and
13th
 Avenue.

The
project
will
support
expansion
opportuni3es
of
the
local
hospital
and
community
college
located
 along
the
corridor.
 Main
Street
Widening
Project
‐
 This
project
involves
widening,
reconstruc3ng
and
installing
curbs‐and‐gufers
to
increase
the
safety
for
the
 traveling
public
and
neighborhood
residents.
 Reconstruc3on
of
major
neighborhood
streets
in
revitaliza3on
area.

Pine
Bluff

AR

Transit

Purchase
four
35
foot
transit
buses.
These
will
improve
the
reliability
of
the
transit
fleet.

Pine
Bluff

AR

Transit

Central
Transfer
Center
‐
Construc3on
of
an
inter‐modal
transporta3on
center
in
downtown
This
facility
will
 s3mulate
the
local
economy
by
helping
to
bring
prospec3ve
customers
and
employees
downtown.


Pine
Bluff

AR

Transit

Pine
Bluff

AR

Water

Pine
Bluff

AR

Water

Pine
Bluff

AR

Water

Pine
Bluff

AR

Water

Springdale Springdale Springdale Springdale Springdale

AR AR AR AR AR

Airport Airport Airport Streets/Roads Streets/Roads

Reconstruc3on
of
Transit
Maintenance
Facility
‐
Facility
reconstruc3on
along
with
the
installa3on
and/or
 replacement
of
key
maintenance
equipment,
including
new
bus
libs,
bus
engine
and
electrical
diagnos3c
 machines
and
others. Sewer
Extension
at
US
Highway
79
B
‐
This
project
involves
the
extension
of
a
sewer
main
along
US
79B
 (University
Drive)
from
Watson
Blvd
to
McFadden
Road. Storm
Drainage
System
‐The
storm
drainage
system
in
Pine
Bluff
is
approximately
90
to
100
years
old
and
is
in
 need
of
replacing
and/or
repairing.
 Sewer
Development
and
Expansion
‐
Pine
Bluff
Wastewater
U3lity
is
reques3ng
funds
to
provide
sewer
service
 to
unsewered
areas
in
the
city
limits
of
Pine
Bluff.


 Sewer
Extension
at
Interstate
530
and
US
Highway
63
‐
This
project
involves
the
construc3on
of
a
new
pumping
 sta3on
and
the
extension
of
a
sewer
main
south
of
I‐530
along
US
Highway
63.
 Feasibility
Study
for
Runway
Extension POFZ
Remedia3on
‐
Holding
Apron
&
Connector
Taxiway Runway
&
Taxiway
Crack
Clean/Seal
Coat Har‐Ber/Emma
Avenue
extension Reconstruc3on
of
Old
Wire
Road

Improvements
I‐530
/US
Highway
65B
‐
Ligh3ng,
signage,
and
landscaping
improvements
to
the
main
 thoroughfare
that
leads
to
UAPB
and
downtown
Pine
Bluff,

enhancing
the
image
of
Pine
Bluff
as
the
gateway
 to
Southeast
Arkansas.
 Conven3on
Center
Improvements
‐ Facility
repairs
and
ligh3ng
and
sound
equipment
upgrades
needed
to
remain
compe33ve
as
a
facility
for
 afrac3ng
major
events
to
Southeast
Arkansas.
 Emergency
Rehabilita3on
‐
Repair
of
exis3ng
housing/emergency
repair
of
exis3ng
housing
units.

Funding
Required

Jobs














700,000


15












1,600,000


20














375,000


25














500,000


29














600,000


30














860,000


30












1,400,000


40












1,200,000


49












1,000,000


49














800,000


49














400,000


60










10,000,000


74












2,000,000


75












2,000,000


75












1,800,000


150












1,200,000


300














200,000


5














500,000


5














250,000


3














300,000


5












1,300,000


75












4,250,000


75










23,000,000


75










10,900,000


100












2,000,000


100














950,000















600,000


22














750,000


49














500,000


7












3,000,000


18












2,000,000


30












3,000,000
 












600,000
 












150,000
 












150,000
 








11,500,000
 








10,000,000


50 10 20 20 100 100

City

State

Program

Springdale Springdale Avondale

AR AR AZ

Streets/Roads Streets/Roads CDBG

Project
Descrip3on

Avondale

AZ

CDBG

Avondale

AZ

CDBG

Avondale

AZ

CDBG

Avondale

AZ

CDBG

Avondale Avondale

AZ AZ

CDBG CDBG

Hill
Street
Extension
‐
Acquire
right
of
way
and
complete
street
extension
and
drainage
improvements
to
 eliminate
crime
and
blight Avondale
Community
Center
Expansion
&
Renova3on‐
Expand
and
renovate
exis3ng
12,000sf
community
 center Central
Avenue
western
to
Van
Buren
–
Mill
and
overlay Van
Buren
Dysart
to
La
Jolla
‐
Rehabilita3on
work

$650,000
55

Avondale

AZ

CDBG

Old
Town
Street
Rehabilita3on

$1,200,000
83

Avondale

AZ

CDBG

Las
Ligas
District
project
‐
3
lanes
re‐construc3on
project
127th
Ave
Lower
Buckeye
to
Dysart












1,400,000


94

Avondale

AZ

CDBG












6,000,000


100

Avondale

AZ

CDBG












2,900,000


120

Avondale

AZ

CDBG

Fes3val
Fields
Park
Development
–
Develop
a
regional
recrea3onal
facility
that
provides
quality
of
life
 opportuni3es Fourth
Street
Clean
Up
–
A
Seven
acre
site
which
is
located
within
a
CDBG
area
contains
an
old
landfill
which
 contains
but
not
limited
to:
metal
and
block
structures,
building
materials,
metal
storage
sheds
and
other
 structures Water
Line
and
Sewer
Improvements
in
CDBG
designated
areas












2,500,000


150

Avondale

AZ

CDBG










22,000,000


600

Avondale

AZ

Energy

Avondale

AZ

Energy

Avondale

AZ

Energy

Avondale

AZ

Energy

City
Facility
comprehensive
energy
management
retrofit‐
to
add
mo3on
ac3vate
switches,
replace
T‐12
and
 incandescent
lights
with
T‐8
and
CFL;
Replace
low
efficient
AC
units Northwest
Public
Safety
Facility
50kw
solar
energy
system

Avondale

AZ

Energy

Municipal
Opera3ons
Service
Center
Solar
energy
system
‐
Installa3on
of
an
112kw
solar
energy
system

Avondale Avondale

AZ AZ

Housing Housing

Avondale

AZ

Housing

Avondale

AZ

Public
Safety

Avondale

AZ

Public
Safety

Avondale
Southwest
Valley
Fire
Preven3on
Program Madison
Heights
Energy
Project
‐
Partner
with
local
u3lity
APS
to
provide
energy
efficient
appliances,
 thermostats,
water
heaters,
shade
screens,
low‐flow
fixtures
and
other
CFL
light
fixtures Madison
Heights
Projects
‐
Project
will
install
drainage
facili3es
such
as
catch
basins,
ditches,
and
storm
drain
 to
reduce
flooding
in
this
CDBG
eligible
area/street Gang
Intelligence
and
Team
Enforcement
Mission
(GIITEM)
–
Will
train
police
officers
in
Gang
enforcement
 strategies School
Resource
Detec3ve
–
Put
in
place
needed
SRD
at
school
sites

Avondale

AZ

Public
Safety

Weed
and
Seed
–
To
improve
and
expand
the
youth‐at‐risk
development
program

Avondale

AZ

Schools

Avondale

AZ

Streets/Roads

Informa3on
Technology
improvements
to
provide
500
personal
computers
and
infrastructure
improvements
 for
school
libraries,
classrooms
and
learning
centers Hill
Street
Extension
‐
Extend
Hill
Street

Avondale

AZ

Streets/Roads

Buckeye
Road:
Avondale
Blvd
to
117th
Alignment
‐
To
design
&
construct
sidewalks
and
landscaping

Avondale

AZ

Streets/Roads

Avondale

AZ

Streets/Roads

McDowell
Road:
Aqua
Fria
Bridge
to
119th
Avenue
(North
Side)
‐
Construct
pedestrian
improvements
on
the
 north
side
of
McDowell
Road Buckeye
Road
Medians:
107th
Avenue
to
Avondale
Blvd.
‐
Add
Medians

Avondale

AZ

Streets/Roads

10
&
Avondale
Blvd
‐
Sidewalks,
Art,
ADA
ramps,
grading,
paving
&
ligh3ng

Avondale

AZ

Streets/Roads

Avondale

AZ

Streets/Roads

Avondale Avondale Avondale Avondale

AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Thomas
Road
(Alignment)
Rancho
Sante
Fe
to
119th
Avenue
‐
Pre‐Design
and
Design
for
a
mul3‐use
path,
 bridge
and
ligh3ng
and
landscaping Van
Buren
Street:
El
Mirage
to
122nd
Avenue
(North
Half)
‐
Add
1
westbound
through
Lane,
paving,
curb
&
 gufer OLD
TOWN
Street
Rehabilita3on
‐
Redo
local
Streets Central
Avenue:
Western
to
Van
Buren
–
Mill
and
Overlay Thomas
Road:
103rd
to
99th
Avenue
‐
Add
1
westbound
Lane Woodrow
Street
Completed
from
Lower
Buckeye
to
Buckeye
Rd
through
Tank
Farm
Alignment
‐
Add
2‐lanes

Avondale

AZ

Streets/Roads

Avondale Avondale Avondale Avondale Avondale

AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

Avondale Avondale Avondale

AZ AZ AZ

Transit Transit Water

Avondale Avondale Avondale

AZ AZ AZ

Water Water Water

Avondale Avondale Avondale

AZ AZ AZ

Water Water Water

Widening
of
Highway
265
 Interestate
interchange
at
Don
Tyson
Blvd. Energy
Packages
to
go
to
first
3me
home
buyers
who
purchase
foreclosed
homes
as
part
of
the
Neighborhood
 Stabiliza3on
Program Coldwater
Park
Improvement
Project
‐
Add
mul3‐model
transporta3on
trail
head
and
ADA
accessibility
to
 regional
trail
system Construct
Buckeye
Road
Medians
–
107th
Ave
to
Avondale
Blvd.
in
the
Cashion
District

Old
Town
Avondale
Revitaliza3on
‐
‐
Reconstruct
streets
and
move
u3li3es
in
old
town
Avondale;
assist
to
 stabilize
Western
Avenue
businesses
to
relocate
from
marginal
blighted
building
into
newly
constructed
 business
spaces Energy
Packages
to
go
to
first
3me
home
buyers
who
purchase
foreclosed
homes
as
part
of
the
Neighborhood
 Stabiliza3on
Program LED
Streetlight
Pilot
Program‐
To
change
out
our
street
lights
to
LED
fixtures

127th
Avenue:
Lower
Buckeye
rd
to
Dysart
(Las
Ligas
District)
‐
Add
Sidewalk,
street
ligh3ng
&
landscaping,
also
 red‐exis3ng
street Avondale
Blvd:
Thomas
to
McDowell
Rd
‐
Add
2
through
lanes Dysart
Road:
Harrison
Street
to
Lower
Buckeye
Road
‐
Construct
a
new
4‐lane
roadway Van
Buren
St:
Avondale
Blvd
to
99th
Avenue
‐
Add
2
lanes Clean
up
on
4th
Street Bus‐to
purchase
a
fibeen
(15)
passenger
vehicle
to
transport
Senior
Ci3zens
and
at‐risk
youth
to
community
 centers
and
community
service
agencies Transit
shelters‐
to
purchase
and
install
twenty
(20)
transit
shelters
throughout
the
city Park
and
Ride
–
15
acre
site Waste
Water
Pretreatment
‐
Will
assist
local
businesses
comply
with
legisla3ve
mandated
pre‐treatment
of
 waste
waters
from
local
businesses Water
Sewer
Radio
Readings
–
Replace
an3quated
sewer
radios Well
Security
–
Provide
security
to
wells
and
water
systems Pre‐treatment
Educa3on
Program
‐
Will
train
staff
on
pre‐treatment
procedures
and
provides
resources
for
 public
educa3on
for
legisla3ve
mandated
pre‐treatment
of
waste
waters Purchase
Rigby
Water
Company Avondale
Blvd
Water
Line
improvements
–
Lower
Buckeye
Rd
to
Gila
River Water
Line
Replacement
–
Lower
Buckeye
to
Dysart

Funding
Required Jobs 










5,000,000
 100 








20,000,000
 150 












180,000


20












2,000,000


30












1,210,000


40














400,000


40












3,000,000
 










2,300,000


45 46














650,000


55












1,200,000


83














180,000


20












4,000,000


20












1,000,000


25














500,000


35












1,000,000
 












135,000


50 2














387,000


50














800,000


60














440,000


2














600,000


4














600,000


4












1,500,000


6














600,000


35














600,000


40














700,000


40












1,200,000


45














650,000


55














700,000


55














600,000
 










1,200,000
 










2,300,000
 












750,000


55 60 65 65














500,000


65












1,400,000
 










1,500,000
 










4,600,000
 










8,075,000
 










3,000,000


80 90 100 160 200
















50,000
 












400,000
 










5,200,000


1 16 200














500,000
 










1,000,000
 










1,200,000


5 10 10










15,000,000
 










4,200,000
 










7,500,000
 












800,000


20 30 35 35

City

State

Program

Avondale Avondale

AZ AZ

Water Water

Project
Descrip3on

Avondale Avondale Avondale Bullhead
City

AZ AZ AZ AZ

Water Water Water Streets/Roads

Bullhead
City

AZ

Streets/Roads

Bullhead
City

AZ

Water

Casa
Grande Casa
Grande

AZ AZ

CDBG CDBG

18‐1
&
18‐2
Lib
Sta3on
and
Gravity
Sewer
Improvements
to
mi3gate
increased
volume
resul3ng
from
sep3c
 tank
removal
and
sewering
of
Bullhead
City. Park
restroom
project.

New
prototype
restroom Airport
apron
parking
(east
and
west).
Water,
Sewer,
Stormwater
and
Pavement
Improvements

Casa
Grande Casa
Grande

AZ AZ

CDBG CDBG

Len
Colla
Gymnasium. Downtown
Street
Reconstruc3on.
Pavement,
u3lity,
landscaping
and
pedestrian
improvements

Casa
Grande Casa
Grande Casa
Grande Casa
Grande Casa
Grande Casa
Grande El
Mirage El
Mirage El
Mirage El
Mirage El
Mirage El
Mirage El
Mirage El
Mirage El
Mirage Flagstaff Flagstaff

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

CDBG CDBG CDBG CDBG CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Public
Safety Public
Safety

Flagstaff Flagstaff

AZ AZ

Water Water

Burris
Sewer
Interceptor.
36"
sewer
and
18"
force
main. Fire
Sta3on
504 Korsten
Rd
Sewer
Extension.
18,
24,
24,
and
36
inch
sewer
line
extensions. Courthouse Cofonwoad
Lane
widening
from
2
to
5
lane.
Aer3al
traffic
lights Public
Safety
Facility Dysart
Road
at
Peoria
Signal Peoria
Avenue
Resurfacing El
Mirage
Road
Resurfacing Dysart
Road
Reconstruc3on
/
Widening Downtown
Resurfacing Dysart
Road
at
Thunderbird
Intersec3on
Improvements El
Mirage
Road
Sewer Cinnabar
Water
Campus Public
Works
Facility
at
WWTP School
Resource
Officers
for
two
high
schools
and
two
middle
schools Crea3on
of
a
selec3ve
enforcement
squad,
which
would
based
upon
comstat
analysis
and
communi3ty
 policing
ini3a3ves,
provide
proac3ve,
problem
solving
tac3cs
to
combat
crime. AIRPORT
WELL
‐
construct
a
new
well
to
meet
water
supply
demands
during
droughts. BEAVER
STREET
WATERLINE
‐
replace
approx.
1400
LF
of
undersized
waterline
and
replace
service
connec3ons.

Flagstaff

AZ

Water

Flagstaff

AZ

Water

Flagstaff

AZ

Water

Flagstaff

AZ

Water

Flagstaff

AZ

Water

Flagstaff

AZ

Water

COLORADO
STREET
WATERLINE
RELOCATION
‐

relocate
approx.
400'
of
6"
waterline
so
that
all
of
the
line
is
in
 the
public
right‐of‐way.

The
line
will
also
be
upsized
to
8". CONNECT
THE
SINAGUA
WELL
‐
constract
power
lines
and
water
lines,
constrct
well
house
to
meet
water
 demands
during
drought. FRANKLIN
WATERLINE
REPLACEMENT
‐
replace
approx.
2300
LF
of
undersized
waterline.

Will
reduce
 maintenance
and
improve
hydraulics. FT.
TUTHILL
WATERLINE
LOOP
‐
extension
of
a
16"
water
transmission
main.

Will
provide
addi3onal
water
 supply,
increase
fire
flows
and
replace
undersized
100
year
old
water
lines. MOHAWK
DRIVE
WATERLINE
‐
replace
approx.
380
LF
of
undersized
waterline
and
provide
any
new
service
 connec3ons
needed.

Will
reduce
maintenance. SOUTH
BEAVER
STREET
SEWER
‐
replace
approx.
950
LF
of
undersized
sewer
line.

Will
reduce
maintenance.

Flagstaff

AZ

Water

SUNNYSIDE
IMPROVEMENTS
‐
replace
old,
undersized
waterlines
in
a
residen3al
neighborhood.












2,118,000


Flagstaff

AZ

Water

Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

CDBG CDBG CDBG Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water

WEST
SIDE
INTERCEPTOR
IMPROVEMENTS
‐
replace
approx.
200
LF
of
8"
sewer
main
with
18"
PVC.

Will
 increase
capacity
to
accommodate
projected
growth. Heritage
District
Redevelopment
Area
Sidewalks Sonora
Town
Water,
Wastewater,
Streets
&
Street
ligh3ng
project Heritage
District
Vaughn
Avenue
Parking
Garage
Economic
Development
Support
Project Neely
Communica3ons
Tower
reconfigura3on Joint
Police
and
Fire
Training
Facility Energy
Saving
Conges3on
Management
and
Traffic
Signal
Management
System Energy
Saving
Traffic
Signal
Installa3on
Germann
&
Quartz Energy
Saving
Traffic
Signal
Installa3on
Riggs
&
Adora
Trails Energy
Saving
Traffic
Signal
Installa3on
Riggs
&
Recker ST096
Recker
Road
‐
Ray
to
1,320
feet
North ST125
Higley
Road
Frye
to
Pecos
 ST057

Greenfield
Road
Pecos
to
Germann ST076
‐
Chandler
Heights
Val
Vista
to
Greenfield ST081
Queen
Creek
Road
Val
Vista
Road
to
East
Maricopa
Floodway ST091

Cooper
&
Warner
Road
Intersec3on ST095
Williams
Field

‐
Railroad
to
Power ST098
Higley
Road
Riggs
to
Hunt
Highway
Arterial
Connec3on ST101
Greenfield
Road
Queen
Creek
to
Chandler
Heights WW081
‐
Manhole
reloca3on
from
East
Maricopa
Floodway WW082
Linda
Lane
Sewer
Tap
replacements WW089
Elliot
District
Park
Recovery
Well WW090
Direct
Reclaimed
water
injec3on
wells WW044
Wastewater
Reclaimed
Water
System
Valve
sta3ons Arsenic
Removal
Equipment
&
Treatment
Systems WA067
‐
Service
Zone
Inter3e WA068
‐
Well
20
Booster
Sta3on














700,000
 












590,000
 










1,500,000
 










8,000,000
 












300,000
 








30,000,000
 












400,000
 












250,000
 












250,000
 












300,000
 










1,600,000
 










2,500,000
 








17,000,000
 








18,500,000
 










9,100,000
 










7,000,000
 








50,000,000
 










8,000,000
 








13,000,000
 












450,000
 












400,000
 












700,000
 












900,000
 












600,000
 










5,000,000
 












750,000
 












550,000


McDowell
Road
Water
Line
Improvements
–
El
Mirage
to
Avondale
Blvd Madison
Heights
Drainage
Project
‐
Will
install
drainage
facili3es
such
as
catch
basins,
ditches,
storm
drain
to
 reduce
flooding
in
this
CDBG
eligible
area/street 99th
Ave
Water
Line
Improvements
–
McDowell
Road
to
Thomas Thomas
Road
Water
Line
Improvements
–
103rd
Ave
to
99th
Ave Rehabilitate
exis3ng
Rigby
Water
Company Neighborhood
Street
Improvement
Plan.
Rebuild
and/or
repave:
McCormick
Blvd,
Miracle
Mile,
Mohave
Drive,
 and
Bullhead
Parkway. Ramar
Rd/Gold
Rush/Arcadia
Blvd.
intersec3on
improvement.

Funding
Required 










1,500,000


Jobs 54














800,000
 










2,500,000
 










1,400,000
 










4,000,000


60 69 69 120












8,000,000


50












7,000,000


50












7,000,000
 












310,000


25 10












1,500,000
 










2,000,000


52 70












3,000,000
 










3,200,000
 










4,500,000
 










8,270,607
 








10,000,000
 










1,950,000
 








21,000,000
 












300,000
 












500,000
 










1,200,000
 










1,600,000
 










2,500,000
 










6,000,000
 










1,200,000
 










4,500,000
 










7,000,000
 












292,000


105 112 157 289 350 437 735 2 4 10 13 20 48 9 36 56 4














438,000
 










1,450,000


6














218,000
 














75,000
 












950,000
 












653,000
 










2,200,000
 












340,000
 












142,000


50 50 100 10 500 10 10 10 10 50 75 100 100 100 100 100 100 100 10 15 15 15 25 50 50 50

City

State

Program

Gilbert Gilbert Gilbert Gilbert Gilbert Gilbert Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Goodyear Kingman Kingman Kingman Kingman Kingman

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG Public
Safety Public
Safety

Project
Descrip3on WA076
‐
Western
Canal
20"
Water
Main WA077
‐
Hobson
Street
12"
Water
line
replacement WW091
Crossroads
Lib
Sta3on
Odor
Scrubber
replacement WA069
‐
Higley
and
Baseline
Water
and
Sewer
Economic
Development WW045
Gilbert
Road
Force
Main
and
Sewer WW070
Candlewood
Lib
Sta3on
Improvements Goodyear
Park
and
Ride
Bike
Storage
Lockers Lib
Sta3on
Upgrade Underdeck
Pedestrian
Ligh3ng
at
Bullard
Wash
I‐10
Bridge Goodyear
Boulebard
University
Pedestrian
Crossing Goodyear
Boulevard
Ballpark
Pedestrian
Crossing Train
Depot EMR
Park
Phase
II Abandoned
Railroad
Cooridor
Rails
to
Trails GWRF
Capacity
Expansion Bullard
Wash
Linear
Park
and
Trail
System City
Center
Infrastructure
Project
‐
Water,
Sewar,
and
Roadway El
Rio
Riparian
Park
and
Trail
System Library Protec3on
of
Luke
AFB
‐
Property
Acquisi3on RID/BID
Canal
Trails City
Hall Brownfield
Redevelopment
‐
Estrella
and
MC85 Unidynamics
Superfund
Cleanup Crime
Scene
Tach Driving
Simulator Internet
Safety
Instructor Prism
Firearms
Training
Simulator Shoot
House Staffing
Sobware AFIS
Kiosk Mobile
Command
Vechile Police
Firing
Range School
Resource
Officers Police
Radio
System City
Training
Facility Police/Fire
Admin Chandler
Heights
Road,
Rainbow
Valley
Road
to
Western
City
Limits Litchfield
Road,
Indian
School
to
Wigwam Rainbow
Valley
Road,
Riggs
Road
to
Hunt
Road Sarival
Road,
Yuma
to
Durango Yuma
Road,
Sarival
to
167th
Avenue Chandler
Heights
Road,
Rainbow
Valley
Road
to
Reams
Road Estrella
Blvd.,
Vineyard
to
Elliot
Road SR303 Chandler
Heights
Road,
Reams
Road
to
Bullard
Road McDowell,
Pebble
Creek
Pkwy
to
303 Pebblecreek
‐
McDowell Thomas
Road,
Litchfield
to
Dysart Bullard,
I‐10
to
McDowell Elwood,
Cofon
to
Sarival Bullard,
Lower
Buckeye
Parkway
to
Estrella
Parkway Bullard,
Van
Buren
to
I‐10 Bullard,
Bullard
Wash
to
Wood
Blvd. Goodyear
Blvd.,
SE
Corner MC85 McDowell,
Litchfield
to
Bullard Yuma
Road
Bridge
over
Bullard
Wash Yuma
Road,
Estrella
Parkway
to
Litchfield Sonoran
Valley
Parkway Yuma
Road,
Estrella
to
Litchfield
Road Regional
Park
and
Ride Lib
Sta3on
Upgrade Wastewater
Collec3on
Lines Historic
Goodyear
Waterline Litchfield
Road
Waterline PGA
South
Treated
Water
Line Surface
Water
Pipelines Water/Waste
Water
SCADA
System Adaman
Water
Interconnect Cofon
Lane
Water
Line
‐
EMR Water/Waste
Water
Transmission
Lines WRF
Capacity
Expansion Locomo3ve
Park
Train
Structure Lewis
Kingman
Park
Restrooms Railroad
Depot
Restora3on
Project Centennial
Park
Light
Replacements Fire
Sta3on
No.
5


Funding
Required Jobs 










2,500,000
 50 












700,000
 50 










2,500,000
 50 










3,600,000
 75 










7,000,000
 75 










7,000,000
 75 












150,000
 5 










1,500,000
 5 












150,000
 5 










3,000,000
 10 










3,000,000
 10 










1,000,000
 25 










5,300,000
 30 










7,000,000
 40 










8,068,000
 40 








15,000,000
 100 








10,000,000
 100 








20,000,000
 100 








10,500,000
 100 








26,000,000
 100 








15,000,000
 100 








55,000,000
 200 








55,000,000
 500 








20,000,000
 500 














20,000
 1 












100,000
 1 












100,000
 1 














50,000
 1 












100,000
 1 














25,000
 1 














40,000
 2 












200,000
 2 










2,000,000
 5 












500,000
 6 










9,079,939
 15 










3,860,000
 25 








14,000,000
 100 












500,000
 5 












350,000
 5 












330,000
 5 












330,000
 5 












660,000
 5 












990,000
 10 










1,100,000
 10 








10,000,000
 10 










1,300,000
 15 












105,881
 15 












461,963
 15 












560,000
 15 












115,515
 20 










1,200,000
 20 










6,000,000
 25 










2,839,022
 25 








10,000,000
 35 










4,000,000
 35 










5,600,000
 35 












311,962
 35 










6,000,000
 35 








13,000,000
 40 








53,000,000
 100 








11,000,000
 100 








11,500,000
 25 










1,500,000
 5 










1,500,000
 10 










1,300,000
 15 










2,000,000
 20 










2,500,000
 20 










3,000,000
 25 










4,000,000
 30 










5,000,000
 35 










5,000,000
 35 










5,000,000
 35 










8,000,000
 40 












110,000
 15 












200,000
 25 












650,000
 40 












200,000
 20 










3,650,000
 219

City

State

Program

Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Kingman Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Fire
Sta3on
No.
2
Reconstruc3on Southern
Avenue
Sidewalk
Installa3on Stockton
Hill
Road/Syacamore
Avenue
Restora3on Topeka
Street
Sidewalk
Installa3on Bank
Street
Overlay
Project Western
Avenue
Street
Improvements,
Beverly
to
Airway Mohave
Wash
Pathway Hualapai
Mountain
Road
Reconstruc3on I‐40/Kingman
Crossing
Traffic
Interchange I‐40/Raflesnake
Wash
Traffic
Interchange
 Chestneu
Street
Water
Line
Extension Metcalfe
Road
Water
Line
Replacement Mohave
Avenue/
Buchanan
Street
Water
Line
Replacement City
Well
No.
11
Booster
Sta3on City
Well
No.
11
Forebay
Tank City
Well
No.
11
Pumping
Equipment Fort
Beale
Water
Tank
Restora3on Mohave
Drive
24‐inch
Water
Transmission
Line Mohave
Channel
Sewer
Extension Hilltop
Treatment
Plant
Upgrade
and
Extension Site
Six
Ramp
Extension
(Safety) Fire
Dept
Open
Air
Apparatus
Storage
Facility/Carport Site
Six
Building
Demoli3on Site
Six
Dock
Shade
Structures Fire
Dept
Open
Air/Covered
Classroom
&
Support
Facili3es Fire
Dept
OSHA‐Required
Confined
Space
Training
Prop Fire
Dept
Paving
of
Training
Grounds Dick
Samp
Memorial
Park:
Environmental
Restora3on
of
Former
Landfill Pedestrian
Bridge
over
Bridgewater
Channel,
Channel
Riverwalk
District SARA
Park
3‐Phase
Power Windsor
Beach
Launch
Ramp
Courtesy
Docks
replacement CVB
Visitor
Informa3on
Center
w/
Public
Restrooms Island
Jogging
Path
Rehabilita3on New
Fire
Sta3on,
Mid
to
Low
Income
Area SARA
Park
Equestrian
Area
(grading,
restrooms,
power,
water,
grandstands) Specialist
Patrick
A.
Tinnell
Memorial
Sports
Park
Construc3on Site
Six
Building,
New
Construc3on Island/Channel
Special
Event
Parking Police
Facility
Parking
&
Entrance
Security Main
Street
Redevelopment:
Pima
Wash
Plaza
Area
Project,
public
space Economic
Synergis3c
Development:
Parking
Garage
at
Airport City
Hall
Parking
Lot
Expansion Police
Academy
Training
Building Dick
Samp
Memorial
Park
basketball
court,
dog
park,
road
and
u3lity
extension;
mul3purpose
field

Project
Descrip3on

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ

CDBG CDBG CDBG

Dick
Samp
Memorial
Park
Facili3es Economic
Synergis3c
Development:
Airport
Terminal Rotary

Park
Restrooms,
Backstops,
Ramadas,
Infrastructure,
Effluent
Line
Extension,
Walkway
Ligh3ng

Lake
Havasu
City

AZ

CDBG

Rotary
Park
restrooms,
backstops,
ramadas,
infrastructure,
effluent
line
extension,
walkway
ligh3ng

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ AZ AZ AZ AZ

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ

Energy Energy Energy

Lake
Havasu
City

AZ

Energy

Economic
Syngergis3c
Development:
Business
Center
at
Airport Contact
Point
Economic
Development:
Performing
Arts
Center Mul3
Story
Parking
Structure,
Main
Street
Redevelopment Police
Dispatch
&
Evidence
Expansion SARA
Park
Recrea3on
Center
&
9
baseball‐sobball
fences SARA
Park
Recrea3on
Center/9
baseball‐sobball
fences MCC
Park:
mul3
use
path,
restrooms,
5
baseball/sobball
field
fences,
4
mul3purpose
fields,
4
parking
areas,
 recrea3on
center,
science
center,
u3lity
extension PWMFRetrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy
Savings
Project Police
Facility
Solar
Panels Community
Center,
Treatment
Plant
Retrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy
 Savings
Project City
Hall
Retrofiqng/Parking
Structures
w/Solar
Power
Regenera3on
Energy
Savings
Project

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Island
Towers
Public
Safety
Infrastructure
Security
System
and
Fencing City
Hall
Public
Safety
Infrastructure
Video
Security
System City
Hall
Public
Safety
Emergency
Infrastructure
Power
System Public
Safety
Infrastructure
Tower
and
Digital
Repeater
System
 Police,
Fire,
PW
Infrastructure
Digital
Radio
System City‐wide
Emergency
Alert
Radio
System Public
Safety
CAD
System
Upgrade Public
Safety
Wireless
Mesh
4.9
Network Acoma‐S.
Palo
Verde
&
Acoma
Smoketree
Traffic
Signals
(Safety) London
Bridge
Abutment
Repairs Main
Street
Entry
Signs SR
95
Streetscapes,
Mesquite
to
Alley
Parking
Area Flood
Control:
Aqua
Wash
Culvert
Improvements
(McCulloch
Blvd) Flood
Control:
Wash
Stabiliza3on
&
Flood
Warning
System
Projects High
School
Bank
Restora3on
Project,
El
Dorado
Wash

Funding
Required Jobs 










5,827,000
 272 














90,000
 8 














80,000
 12 












130,000
 12 












300,000
 20 












350,000
 25 












500,000
 60 










4,400,000
 265 








27,095,000
 560 








39,700,000
 625 














80,000
 7 












100,000
 8 












125,000
 10 












400,000
 20 












500,000
 25 












600,000
 25 












600,000
 25 










1,200,000
 30 












500,000
 35 








30,800,000
 620 














20,000
 3 














90,000
 4 














70,000
 4 














40,000
 4 












310,000
 6 












100,000
 6 












162,200
 7 












620,000
 10 










1,000,000
 10 












150,000
 10 












200,000
 10 












775,000
 14 












350,000
 15 










3,000,000
 19 












440,000
 25 










1,400,000
 25 










1,330,000
 30 












750,000
 45 












350,000
 65 








10,000,000
 75 










4,000,000
 79 












750,000
 85 












750,000
 85 










3,200,000
 










3,200,000
 










4,000,000


90 90 90












3,200,000


90












3,200,000
 








16,000,000
 










9,400,000
 










6,600,000
 










5,880,000
 








19,000,000
 








19,000,000


90 95 100 100 125 532 532










26,800,000
 










3,400,000
 












400,000


750 60 75












6,800,000


120












7,280,000
 












165,000
 












110,000
 












470,000
 










1,250,000
 








75,000,000
 












150,000
 












850,000
 










2,100,000
 












500,000
 












250,000
 












200,000
 












250,000
 












500,000
 










1,000,000
 












800,000


130 5 8 10 35 75 80 125 13 15 15 15 25 25 25

City

State

Program

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

London
Bridge
Roadway
Replacement/Texture El
Dorado
Wash
Culvert
Improvements
(Lake
Havasu
Ave) N.
Palo
Verde
Blvd
Widening
Phase
II SARA
Park
Road
Widening El
Dorado
Wash
Culvert
Improvements
(Palo
Verde) Flood
Control:
Swanson
Box
Culvert
(Pima
Wash) Smoketree
and
McCulloch
Overlay McCulloch
(on
Island)
Repaving Acoma
Overlay
Project Island
Roadway
and
Drainage
Projects Contact
Point
Economic
Development:
Roads,
Infrastructure,
Development
on
BLM
R&PP
Lease
to
City

Project
Descrip3on

Funding
Required 












350,000
 










1,000,000
 










1,000,000
 












520,000
 










1,250,000
 










1,250,000
 










1,500,000
 










2,000,000
 










2,000,000
 










2,000,000


Jobs 25 30 35 35 40 40 50 65 75 75

Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Lake
Havasu
City Mesa Mesa

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Airport Airport

Flood
Control:
El
Dorado
Wash
Culvert
Installa3ons
(3) Lake
Havasu
Avenue‐Widen Sweetwater/Maricopa
Widening/Sidewalks Residen3al
Flood
Control/Street
Widening:
Sewer
Area SR95
Mul3
Use
Pathway
Extension
(14
miles) Highway
95
Mul3‐Use
Pathway
Extension
(14
miles) SR95
Streetscapes
(14
miles) Residen3al
Flood
Control/Street
Widening:
Non‐Sewer
Area 6
Trolleys
(3
Routes
&
Tourism
Transporta3on
Services Booster
"A"
&
"C"
Demoli3on Sta3on
3C
Under‐Floor
Cathodic
System Bridgewater
Channel
Dredging
Safety
Project,
Federal
Waterway 30‐inch,
36inch
Interconnect
SR95 Desert
View
Water
Main
Replacement Temperature
Control
at
WTP/Collector
Well
for
Pumps North
Havasu
Booster
Sta3on
(Airport) Sta3on
5A
Reservoir Water
System
Storage
Building Booster
Sta3on
No.
3
Reconstruc3on North
Havasu
Pump
Sta3on
Tanks Water
Treatment
Plant
Security
Wall SARA
Park
Water
Main SARA
Park
Water
Re‐Use
Conserva3on
Line Water
Booster
Sta3ons
1,
3
&
5 Bill
Williams
Diversion
Project Wastewater
System
Expansion
Program
Comple3on Falcon
Field
4R
Run‐up
Area Falcon
Field
Airport Anzio
Ramp
Expansion










10,200,000
 










3,250,000
 










4,150,000
 










4,000,000
 










5,000,000
 










5,000,000
 










5,250,000
 








10,000,000
 








20,000,000
 










1,980,000
 












100,000
 












100,000
 












365,000
 












120,000
 












250,000
 












200,000
 












500,000
 










1,500,000
 












350,000
 










3,000,000
 










1,000,000
 












500,000
 












690,000
 












590,000
 








10,000,000
 








60,000,000
 






161,507,000
 










1,500,000


90 100 120 125 200 200 220 400 1000 9 5 6 9 10 10 10 15 15 20 25 25 25 40 40 200 800 1500

Mesa

AZ

Airport

Falcon
Field
Airport Anzio
Ramp
Expansion

Mesa

AZ

Airport

Falcon
Field
Airport Automated
Weather
Observing
System














250,000


Mesa

AZ

Airport

Falcon
Field
Airport Blast
Pads
‐
RWY
4L‐22R














525,000


Mesa

AZ

Airport

Falcon
Field
Airport East
Ramp
Reconfigura3on














300,000


Mesa

AZ

Airport

Falcon
Field
Airport East
Side
Aeronau3cal
Use
Taxiway

Mesa

AZ

Airport

Falcon
Field
Airport Environmental
Assessment
for
TWY
F
construc3on














100,000


Mesa

AZ

Airport

Falcon
Field
Airport Falcon
Field
Airfield
Storm
Drainage
System














600,000


Mesa

AZ

Airport

Falcon
Field
Airport High‐Speed
Runway
Exits
for
RWY
4L‐22R
















75,000


Mesa

AZ

Airport

Falcon
Field
Airport High‐Speed
Runway
Exits
for
RWY
4L‐22R














788,000


Mesa

AZ

Airport

Falcon
Field
Airport Higley
Ramp
Reconstruc3on














180,000


Mesa

AZ

Airport

Falcon
Field
Airport Northwest
Quadrant
Access
Roads














400,000


Mesa

AZ

Airport

Falcon
Field
Airport RWY
4R‐22L
PAPI/REIL
Upgrades














325,000


Mesa

AZ

Airport

Falcon
Field
Airport RWY/TWY
Pavement
Preserva3on














530,000


Mesa

AZ

Airport

Mesa

AZ

Airport

Mesa

AZ

Airport

Mesa

AZ

Airport

Falcon
Field
Airport Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights Falcon
Field
Airport Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights
(Phase
1) Falcon
Field
Airport Taxiway
B
Reconfigura3on
&
Install
Runway
Guard
Lights
(Phase
2) Falcon
Field
Airport TWY
F
Construc3on
(Phase
1)














150,000
 










1,500,000













2,500,000















150,000
 










1,500,000
 










1,500,000
 










5,000,000


City

State

Program

Mesa

AZ

Airport

Falcon
Field
Airport TWY
F
Construc3on
(Phase
2)

Project
Descrip3on

Funding
Required

Mesa

AZ

Airport

Falcon
Field
Airport TWY
F
Construc3on

Mesa

AZ

Airport

Phx‐Mesa
Gateway
Airport Construct
Airfield/Apron
Drainage












3,800,000


Mesa

AZ

Airport

Phx‐Mesa
Gateway
Airport Construct
Alpha
Apron












6,000,000


Mesa

AZ

Airport

Phx‐Mesa
Gateway
Airport Construct
Taxiway
B
from
L
to
N












9,000,000


Mesa

AZ

Airport

Phx‐Mesa
Gateway
Airport Construct
Taxiway
L













9,023,000


Mesa

AZ

Energy

Gas
Gate
Sta3on
#3
and
8"
High
Pressure
Gas
Main
on
Power
Road;
Pecos
Road
to
Baseline
Road


Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa Mesa

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Gas
Main
and
Water
Service
Replacement
in
Quarter
Sec3on
21C
Neighborhood SCADA
System
for
Natural
Gas
Distribu3on
System Fire
Sta3on
#215
(Phoenix‐Mesa
Gateway) Fire
Sta3on
#219 Fire
Sta3on
#318 Security
Site
Hardening
at
Various
City
Buildings Arterial,
Collector,
Residen3al
Overlays ASU
Polytechnic
Ring
Road
located
at
Phoenix‐Mesa
Gateway
Airport Broadway
Road,
Sossaman
Road
to
Hawes
Road Country
Club
Drive
ITS
Improvements Dobson
Road
and
Guadalupe
Road
Intersec3on Dobson
Road
and
University
Drive
Intersec3on East
Loop
ITS
Device
Deployment
(Red
Mountain
Freeway
and
US
60) Fiber
Op3c
Lines
‐
Signal
System
for
US
60
Connec3vity,
Phase
4B Gilbert
Road
and
University
Drive
Intersec3on Greenfield
Rd:
Baseline
Road
to
Southern
Avenue Hawes
Road:
Santan
Fwy
to
Ray
Road Mesa
Drive:
Southern
Avenue
to
US‐60
(Supers33on
Fwy) Power
Road:
Phase
III,
Santan
Freeway
to
Pecos
Road Ray
Road:
Sossaman
Road
to
Ellsworth
Road Santan
Freeway
ITS
Fiber
Backbone,
US
60
to
Power
Road Central
Mesa
‐
Light
Rail
3.5
miles
of
construc3on
and
u3lity
reloca3ons
extending
LRT
through
downtown
 Mesa
to
Horne
Avenue Central
Phoenix/East
Valley
LRT
‐
Park‐and‐Ride
Expansion Central
Phoenix/East
Valley
LRT
‐
Park‐and‐Ride
Shade
Canopies
 Central
Phoenix/East
Valley
LRT
‐
System
Enhancements
 Downtown
Circulator
Fleet
Replacement Park
and
Ride;
Gilbert
Road
and
Red
Mountain
Freeway
(Loop
202) Park
and
Ride;
Power
Road
and
Red
Mountain
Freeway
(Loop
202) Apache
Country
Club
Estates
Water
Line
Replacement Diversion
Structures
at
Baseline/Ellsworth
and
Broadway/56th
Street Drilling
and
Equipping
New
Well
Sites Equipping
Well
Sites
 Falcon
Field
Water
Zone
Pump
Sta3on
#6 Flow
Diversion
Structure
for
Northwest
Reclama3on
Plant Improvements
to
Water
Pump
Sta3ons New
Sewer
Sulfide
Sta3ons North
CAP
Water
Treatment
Plant
Improvements Northwest
Water
Reclama3on
Plant
Improvements Raw
Waterline
from
CAP
Canal
to
South
CAP
Water
Treatment
Plant Rehabilitate
Wastewater
Crossings
under
US
60 Replacement
of
Aging
Residen3al
Water
Lines Replacement
of
Water
Lines
in
Desert
Sands
Subdivision Security
Improvements
at
Desert
Well
#11 Sewer
Line
on
Gateway
Avenue;
Crismon
to
Signal
Bufe Sewer
Line
on
Rifenhouse
Road;
Power
Road
to
East
Mesa
Interceptor Southeast
Water
Reclama3on
Plant
Improvements Sunland
Springs,
Siphon
Draw
Flood
Control
Improvements Upgrade
Electrical
Equipment
at
Well
Sites Various
Storm
Sewer
Improvements Various
Wastewater
Manhole
Rehabilita3on Water
and
Wastewater
Improvements
on
ASU
Polytechnic
Campus
(Phase
II
and
III) Water
and
Wastewater
Lines
on
Warner
Road;
Power
to
Ellsworth
Road Water
Line
and
Gas
Line
Replacement
on
Broadway
Road;
Country
Club
to
Gilbert
Road Water
Line
on
Elliot
Road;
Power
Road
to
Sossaman
Road Water
Line
on
Elliot
Road;
Sossaman
Road
to
Hawes
Road Water
Line
on
Ellsworth
Road;
Ray
to
Pecos
Road Water
Line
on
Hawes
Road:
Elliot
Road
to
Ray
Road Water
Line
on
Pecos
Road;
Signal
Bufe
to
Ellsworth
Road Water
Line
on
Signal
Bufe;
Elliot
Road
to
Ray
Road Water
Line
on
Signal
Bufe;
Ray
Road
to
Pecos
Road Water
Line
on
Sossaman
Road,
1/2
mile
N.
of
Willamsfield
Road
to
Pecos
Road Water
Line
on
Sossaman
Road;
1/2
mile
N.
of
Elliot
Road
to
Ray
Road












5,000,000
 












250,000













3,356,000
 










3,000,000
 












400,000
 










7,900,000
 










4,400,000
 










4,400,000
 












400,000
 








20,000,000
 








13,500,000
 








14,300,000
 










2,509,641
 










5,500,000
 










6,500,000
 










3,000,000
 










2,500,000
 








12,000,000
 










6,500,000
 










3,800,000
 








18,000,000
 








19,000,000
 








18,500,000
 










2,000,000
 






290,000,000
 








60,000,000
 








20,000,000
 








20,000,000
 










2,000,000
 










2,500,000
 










1,700,000
 










1,351,000
 










1,300,000
 










4,200,000
 










2,100,000
 










1,000,000
 










2,300,000
 










2,800,000
 










3,000,000
 










1,500,000
 










2,700,000
 








10,034,244
 










4,000,000
 










6,614,000
 










3,029,598
 












561,423
 










1,400,000
 










3,220,000
 










6,500,000
 










8,230,524
 










1,200,000
 










8,000,000
 










1,300,000
 








14,700,000
 










5,688,000
 










3,675,000
 










1,000,000
 










1,500,000
 










1,750,000
 










3,000,000
 










2,356,480
 










3,000,000
 










1,700,000
 










1,000,000
 










1,100,000


Jobs

City

State

Program

Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy

Rio
Vista
Emergency
Generator
for
emergency
cooling
shelters Sta3on
safety
upgrades Renovate
four
historic
school
buildings
within
the
historic
renova3on
guidelines Renovate
Peoria's
first
fire
sta3on
according
to
historic
preserva3on
guidelines 99th
Avenue
and
Olive
Road
Trailhead
 Community
Park
#2 New
River
Trail
Grand
Avenue
Underpass New
River
Trail:
Bell
Road
to
Union
Hills
Segment New
River
Trail:
Northern
to
Olive
Avenue
Segment Olive
Avenue/New
River
Trail
Underpass Osuma
Park
Renova3ons Peoria
Avenue/New
River
Trail
Underpass Peoria
Public
Safety
Support
Services
Facili3es Scotland
Yard
Neighborhood
Park Centennial
Park Palo
Verde
Cultural
Open
Space
and
Park Community
Center Peoria
Sports
Complex
Improvements Recalk/seal
expansion
joints
in
five
municipal
buildings
at
135,000
square
feet Add
solar
panels
to
two
exis3ng
parking
structures
with
covered
parking
at
municipal
office
complex

Project
Descrip3on

Peoria Peoria Peoria

AZ AZ AZ

Energy Energy Energy

Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Solar
electric
system
for
Peoria
Fire
Sta3on
‐
pilot
program Install
alterna3ve
fueling
sta3on
and
fleet
shop
upgrades
(natural
gas
or
hydrogen) Energy
efficiency
for
three
public
aqua3c
centers
‐
replace
exis3ng
motors
with
variable
frequency
drive,
install
 VFD
on
HVAC
units,
add
mo3on
ac3vate
switches,
replace
lights
with
CFL,
replace
pool
covers
to
minimize
heat
 loss. City
Hall
Campus
Central
Plant
Upgrade Add
covered
parking
to
two
exis3ng
parking
structure
along
with
solar
panels Administra3on
internship
program
for
at‐risk
women CAD
Replacement Target
Hardening
remodel
Public
Safety
Admin.
Building Municipal
Courts
Expansion
to
enhance
security
and
public
safety North
Municipal
Complex Traffic
Management
Center 75
Avenue/Greenway
Water
Treatment
Plant
Fiber
Op3cs Lake
Pleasant
Road/Westwing/Jomax
Road
Fiber
Op3cs 83
Avenue
and
Thunderbird
Intersec3on
Improvements Drywells Glendale
‐
Peoria
ADMP
Update Washington
street
strom
drainage
alley ADA
Sidewalk
Ramps 103
Avenue
Street
Repair:
Olive
Avenue
to
Northern
Avenue
 81
Avenue
1/2
street
improvements 83
Avenue
Median:
Beardsley
Road
to
Village
Pkwy 89
Avenue
and
Union
Hills
Drive
Structure
Upgrades Traffic
Signal
Program Lake
Pleasant
Parkway:
CAP
to
State
Route
74
(four
lanes) 67
Avenue
and
Happy
Valley
Road
Intersec3on
Improvement 67
Avenue
and
Peoria
Avenue
Intersec3on
Improvements 67
Avenue
and
Thunderbird
Road
Intersec3on
Improvements 67
Avenue:
Olive
Avenue
to
Thunderbird
Road 83
Avenue
and
Deer
Valley
Road
Intersec3on
(interim) 83
Avenue
Drainage:
Williams
Road
to
Calle
Lejos Bell
Park
Sound
Wall Esquire
Manor
Reconstruc3on Lake
Pleasant
East
Reconstruc3on Westwing
Substa3on
Access
Road Thunderbird
Road
Widening/
Rehab:
L101
to
95
Avenue 75
Avenue
and
Cactus
Road
Intersec3on
Improvements 75
Avenue
and
Peoria
Avenue
Intersec3on
Improvements 75
Avenue
and
Thunderbird
Road
Intersec3on
Improvements 83
Avenue
Widening:
Williams
Road
to
Calle
Lejos 87
Avenue
Storm
Drain:
Olive
Avenue
to
Monroe
Street 87
Avenue
Storm
Drain:
Peoria
Avenue
to
Becker
Lane 87
Avenue:
Olive
Avenue
to
Hatcher
Road 91
Avenue
and
Olive
Avenue
Intersec3on Butler
Drive
Storm
Drain:
79
Avenue
to
83
Avenue 75
Avenue
Storm
Drain:
Cactus
Road
and
Sweetwater
Avenue Happy
Valley
Road:
75
Avenue
to
Lake
Pleasant
Pkwy Westbrook
Village
Court
Verdict
Drainage
Improvements Rose
Garden
Lane
Channel 83
Avenue
Realign:
Railroad
Crossing
and
Grand
Avenue
Intersec3on 83
Avenue
Widening:
Mountain
View
Road
to
Olive
Avenue 84
Avenue
Streetscape Cofon
Crossing:
Monroe
Street
to
Mountain
View
Road Pinnacle
Peak
Road
Widening:
107
Avenue
to
91
Avenue Washington
Street
Storm
Drainage
Alley Deer
Valley
Road
Drainage:
91
Avenue
to
83
Avenue

Funding
Required Jobs 












500,000
 5 














76,600
 6 










2,000,000
 20 










1,000,000
 20 












750,000
 25 








27,500,000
 25 












800,000
 25 












900,000
 30 










1,200,000
 40 










1,500,000
 40 










1,000,000
 40 










1,000,000
 40 










6,685,000
 50 










2,000,000
 50 










2,000,000
 60 










2,000,000
 60 








11,400,000
 100 








12,500,000
 250 












150,000
 5 












300,000
 












400,000
 










2,500,000


8 8 11














250,000
 










3,600,000
 










3,000,000
 














27,292
 










5,000,000
 










1,000,000
 








11,000,000
 








11,000,000
 










1,478,200
 










2,399,192
 










2,394,664
 












500,000
 












217,093
 












450,000
 












386,000
 












600,000
 












152,000
 












460,141
 










1,003,654
 












459,440
 










9,343,805
 










5,326,955
 










1,229,782
 










1,235,861
 










2,106,321
 










3,880,268
 










2,647,910
 










3,765,000
 












636,704
 










1,997,413
 










2,079,125
 










1,000,329
 








15,146,666
 










6,992,094
 










5,509,637
 










8,006,704
 










7,127,115
 










3,402,196
 












117,394
 










2,383,722
 










3,776,388
 










3,385,495
 










2,394,202
 








40,488,000
 










5,917,271
 










9,091,021
 










4,863,493
 










5,201,524
 










1,512,772
 












989,520
 










4,879,618
 












392,376
 










3,572,945


20 45 80 2 10 24 30 30 1 2 2 3 3 3 3 4 5 5 5 5 5 6 7 7 7 7 7 7 7 7 7 7 8 10 10 10 10 10 10 10 10 10 12 12 12 14 15 15 15 15 15 15 20

City

State

Program

Peoria Peoria Peoria Peoria Peoria Peoria

AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

Project
Descrip3on

Peoria

AZ

Transit

Peoria

AZ

Transit

Peoria

AZ

Transit

Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Peoria Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Airport Airport Airport Airport Airport Airport Airport

Bus
purchase‐
purchase
five
new
buses
for
new
fixed
route
services
on
a
unserved
arterial
roadway
with
an
 established
transit
need.
 Transit
bus
stop
infrastructure
(passenger
shelter,
pads,
ligh3ngs
and
ameni3es)
‐
purchase
and
installa3on
of
 72
transit
passenger
shelters,
improve,
refurbish
and/or
replace
an
addi3onal
28
exis3ng
bus
stops
and
 improve
ADA
access
in
support
of
new Park
and
ride
lot
to
encourage
regional
mass
transporta3on Transit
center
to
encourage
regional
mass
transporta3on PRV
Sta3on
Upgrades
‐
Cofon
Crossing
/75
Avenue/
Olive
Avenue PRV
Sta3on
Upgrades:
Cactus
and
91
Avenue 8
inch
waterline
Hatcher
Road:
75
Avenue
to
77
Avenue Stone
Well
Site
Rehab Edwards
Tract
Waterline
Improvements 99
Avenue
and
Rose
Garden
Well Northern
Avenue:
16
inch
waterline/
107
Avenue
and
103
Avenue 97
Avenue
and
Deer
Valley
Well Pinnacle
Peak
Road:
16
inch
waterline
New
River
to
82
Avenue Jomax
Booster
Sta3on
Upgrade
to
18
million
gallons
a
day 75
Avenue:
16
inch
waterline
‐
Cholla
Road
to
Thunderbird
Road 12
inch
waterline:
Pinnacle
Peak
and
67
Avenue Zone
2/3
booster
sta3on 91
Avenue:
24
inch
waterline/Beardsley
to
Union
Hills Northern/
95
Avenue
36
inch
Sewer
Rehab
phase
1 Northern/
95
Avenue
36
inch
Sewer
Rehab
Phase
2 Agua
Fria
West
PRV/Booster
Sta3ons
‐
Phase
1 Beardsley
Road:
24
inch
waterline
‐
87
Avenue
to
Lake
Pleasant
Road Greenway
Water
Treatment
Plant
‐
5
Million
Gallon
Reservoir 91
Avenue
24
inch
waterline/Union
Hills
Road
to
Greenway
Road Greenway
Road
24
inch
waterline/91
Avenue
to
79
Avenue Deer
Valley
Airport
‐
Aircrab
Run‐Up
Area
Construc3on
Runaway
Safety
Ac3on
Team. Deer
Valley
Airport
‐
Runway
Safety
Area
Grading. Deer
Valley
Airport
‐
Runway
Safety
Areas
Improvements. Deer
Valley
Airport
‐
South
Ramp
Reconstruc3on. Deer
Valley
Airport
‐
Taxiway
Alpha
Reconstruc3on. Deer
Valley
Airport
Signage
‐
Runaway
Safety
Ac3on
Team. Goodyear
Airport
‐
Widen
and
strengthen
taxiway
intersec3ons
on
Alpha
to
meet
Group
IV
category
aircrab.

Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Automated
Train
connec3on
to
Terminal
3.








200,000,000


Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Construc3on
of
the
Automated
Train
Guideway.








166,000,000


Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Design,
and
eventually
construct,
Runway
7R/25L
to
Taxiway
Hotel
Connector.












4,050,000


Phoenix

AZ

Airport












8,925,000


Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
East
Ground
Transporta3on
Center
‐
entry
for
passengers,
commercial
vehicles,
high
 occupancy
vehicles
and
buses. Phoenix
Sky
Harbor
‐
Improvements
to
the
Runway
7R/25L
Runway
Safety
Area
and
Object
Free
Area.

Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Phoenix
East
Access
Roadway
Improvements
T4
south.












5,056,000


Phoenix

AZ

Airport










17,000,000


Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Phoenix
T‐3
Roadway
Lane
Expansion
‐
Construct
an
addi3onal
roadway
lane
north
and
 south
of
the
terminal. Phoenix
Sky
Harbor
‐
Phoenix
Terminal
4
Apron
rehabilita3on
and
repairs.

Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Reconstruc3on
and
Modifica3on
of
East
Access
Roads.










28,392,000


Phoenix

AZ

Airport

Phoenix
Sky
Harbor
‐
Washington
Street
pedestrian
bridge
‐
connects
Light
Rail
sta3on
to
the
Automated
Train.

Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix

AZ AZ AZ AZ AZ AZ AZ AZ AZ

Energy Housing Housing Housing Housing Housing Housing Housing Public
Safety

Phoenix

AZ

Public
Safety

Phoenix

AZ

Public
Safety

SR85
Solar
Energy
Project Foothills
Village
(200
apartments)
improvements. Frank
Luke,
A.L.
Krohn,
S.P.
Osborn
(753
apartments)
improvements. Marcos
de
Niza
(374
apartments)
improvements. Maryvale
Parkway
Terrace
(108
senior
apartments)
improvements. Maryvale
Parkway
Terrace
(108
senior
apartments)
improvements. Pine
Towers
(156
senior
apartments)
improvements. Scafered
Site
Homes
(433
single
family
homes)
improvements. Automa3c
Vehicle
Loca3on
(AVL)
System
‐
This
project
would
provide
for
the
acquisi3on
of
the
sobware
in
 patrol
vehicles
so
that
they
may
u3lize
GPS. Community
Prosecu3on
‐

The
purpose
of
the
project
is
to
develop
two
new
community
prosecu3on
efforts
 with
a
target
neighborhood
in
each
of
the
two
new
Phoenix
Police
Department
Precincts. Enhanced
Mobile
Data
Security
‐
Funding
would
be
used
to
provide
two‐factor
authen3ca3on
(i.e.
password
 and
fingerprint
scan)
and
firewalls
to
mobile
devices
so
that
they
can
securely
access
criminal
jus3ce
data

Phoenix

AZ

Public
Safety

Street
ligh3ng
upgrade
and
replacement

‐
reduce
energy
demand
and
safety Carefree
Highway
Dirt
Road
paving
to
enhance
air
quality
and
improve
safety Arterial
overlay
recondi3on
major
city
arterials
(5
miles) Castle
Hot
Springs
Road
to
enhance
air
quality
and
improve
safety Residen3al
overlay
(5
square
miles)
‐
recondi3on
aging
residen3al
streets Regional
Park
and
Ride
Lots
security
improvements
‐
enhance
security
for
park
and
ride
lots
users
and
vehicles,
 improved
ligh3ng
in
parking
and
bus
stops
areas
with
upgraded
bulbs
and
residen3al
shielding,
add
closed
 circuit
television
(CCTV),
internet
 Fixed
Route
bus
service
expansion
and
enhancement.
Increase
Fixed
Route
bus
service
opera3ons
to
seven
 days
per
week
on
an
exis3ng
route
and
ini3ate
service
on
two
iden3fied
arterial
roadways
within
the
city

ePRO
(Electronic
Prosecutor
Records
Organiza3on)
project
which
is
a
phased
module
replacement
project
for
 the
exis3ng
case
management
system
and
includes
the
development
of
electronic
processes
to
manage
the
 case
work
by
aforneys
and
staff.

Funding
Required Jobs 










5,000,000
 20 












260,000
 24 










5,000,000
 30 










1,000,000
 38 








10,000,000
 40
















42,000


1












1,600,000


2












2,250,000


5












2,100,000
 










3,800,000
 










1,700,000
 












550,000
 












454,500
 










1,045,350
 










1,000,000
 










1,090,880
 










1,499,300
 










1,434,000
 










1,700,000
 










1,868,500
 










2,080,600
 










2,439,150
 










2,676,500
 










3,474,400
 










3,686,500
 










4,317,511
 










4,317,511
 










5,005,800
 










7,484,100
 










8,958,700
 










9,655,600
 










9,958,600
 










2,000,000
 










1,350,000
 










9,251,988
 










4,894,839
 










8,620,000
 












500,000


5 30 60 3 3 6 6 7 9 9 10 11 13 15 16 21 22 26 26 30 45 54 58 60












3,218,000











11,585,760













5,086,200











16,570,000
 








50,000,000
 












463,000
 










1,267,000
 












515,000
 












255,000
 












212,000
 












190,000
 










3,600,000
 












500,000
 












773,000















500,000















120,000


City

State

Program

Phoenix

AZ

Public
Safety

Phoenix

AZ

Public
Safety

Phoenix

AZ

Schools

Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit

Statewide
Coplink‐
Funding
would
be
used
to
acquire
a
statewide
license
for
Coplink
allowing
all
state
agencies
 to
connect
to
one
of
the
four
regional
Coplink
nodes
in
the
state
of
Arizona. Two‐Finger
Rapid
Subject
Iden3fica3on
Program
‐
Funding
would
be
used
to
acquire
equipment
for
iden3fying
 subjects
via
wireless
two‐finger
rapid
iden3fica3on
technology
in
patrol
cars. Arizona
State
University
Downtown
Phoenix
Campus
City
Center
Hall
‐
A
100,000
square
foot
building
built
to
 LEED
standards
will
house
three
60‐seat
classrooms,
three
150‐seat
classrooms,
one
250‐seat
classroom
and
 one
400‐seat
classroom ADA
Improvement
Program
‐
Barrier ADA
Improvement
Program
‐
Major
Construc3on Bridge
Rehabilita3on,
Inspec3on
and
Maintenance
Program Dust
Control
(PM‐10)
Program ITS
Program Laveen
Conveyance
Area
Channel Light
Emiqng
Diode
(LED)
Traffic
Signal
Conversion Major
Collector
and
Residen3al
Overlay
(20
year
cycle) Major
Streets
Projects North
Interstate‐17
Corridor
Service
Center Pedestrian
improvements
at
Central
Avenue
and
the
Salt
River
(in
Regional
Transporta3on
Improvement
Plan) Pedestrian/Bike
Safety
Program
Improvements Rawhide
Wash
Roadway
Improvements Remote
Emergency
Traffic
Center Sign
Relec3vity
and
Retrofit
Improvement
Program Street
Moderniza3on
and
Sidewalk
Installa3on
Program Aquire
and
install
a
new
transit
stop
database Avoid
planned
suspension
of
all
bus
service
before
5am
and
aber
10pm
beginning
12/29/08

Project
Descrip3on

Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix Phoenix

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Transit Transit Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Avoid
reducing
Saturday
bus
service
frequency
beginning
12/29/08. Bus
Video
Monitoring
System Regional
Light
Rail
Park‐and‐Ride
Expansion Regional
Light
Rail
Park‐and‐Ride
Safety
and
System
Enhancements Regional
Light
Rail
Park‐and‐Ride
Shade
Canopies Regional
Light
Rail
Park‐and‐Ride
Structure Transit
Center
renova3ons Transit
Crossover
Lane
on
State
Route
51 23rd
Avenue
Wastewater
Treatment
Plant
(two
Phases) 24th
Street
Water
Treatment
Plant
‐
Chlorine
Contact
Basin 27th
Avenue
Transfer
Sta3on
Retrofit Deer
Valley
Water
Treatment
Plant
‐
Process
Op3miza3on,
Ferric
Conversion,
Security Drilling
and
installa3on
of
new
well Fire
Hydrant
Installa3on
(two
projects) Lib
Sta3on
Security
Upgrades
(seven
projects) Paradise
Valley
Water
System
Upgrade Phoenix
Area
remote
Facili3es Relief
Sewer
Projects
(three
projects) Skunk
Creek
Storm
Water/Drainage SR85
Storm
Water/Drainage Steel
tank
rehab Tres
Rios
Project
with
US
Corp
of
Engineers
‐
Pump
Sta3on,
Over
Bank
Wetlands,
Flow
Regula3ng
Wetlands

Phoenix Phoenix Phoenix Phoenix Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Sahuarita Scofsdale

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Water Water Water Water Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water CDBG

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Union
Hills
Water
Treatment
Plant
‐
BAC
Conversion Val
Vista
Water
Treatment
Plant
GAC
conversion Water
Main
Replacements
(six
projects) Water
Main
Replacements
and
Improvements
(six
projects) Ford
Crown
Victoria
Patrol
Car
with
equipment
build
out
(X10) Spillman
Mobile
Report
Sobware Spillman
Property/Supply
Sobware Teen/Police
Driving
Track
with
associated
land,
structure
and
equipment Addi3onal
School
Resource
Officer Con3nued
funding
for
School
Resource
Officer Equipment/Fleet
Manager Nogales
Highway/Old
Nogales
Highway
Traffic
Signal Two
Sahuarita
Road
Pedestrian
Underpasses Interim
Traffic
Signals
at
Sahuaria
Road
&
I‐19 Pima
Mine
Road/Rancho
Sahuarita
Railroad
Crossing
and
Traffic
Signal Santa
Cruz
River
Bridge
Replacement
over
Pima
Mine
Road La
Canada
Drive
Road
Improvements
Phase
III Sahuarita
Road/I‐19
Interchange Sahuarita
Road
Phase
1
&
2:
I‐19
to
Country
Club Wastewater
Administra3on
Building Wastewater
Treatment
&
Reclama3on
Facility
3.0
MGD
Expansion South
Scofsdale
Drainage
Improvements‐
Neighborhood
drainage
improvements
to
protect
the
Belleview
 Neighborhood
from
100
year
flooding. Civic
Center
Improvements,
Replace
HVAC
system
for
all
four
Civic
Center
buildings
that
are
housing
CDBG
 eligible
community
groups
and
provide
accessibility
improvements. Black
Hills
Tank
Dam
Removal
‐
Remove
old
and
poten3ally
unsafe
stock
dam
to
mi3gate
possible
downstream
 flood
risk Deten3on
Facility
Consolida3on
‐
Remodel
and
expand
the
Civic
Center
Jail.

Funding
Required

Jobs












1,000,000
 










1,000,000











40,000,000
 










1,500,000
 










1,965,616
 








30,315,500
 










5,170,621
 








10,751,000
 










1,500,000
 










9,800,000
 






106,841,900
 






107,610,758
 








20,000,000
 










3,000,000
 








13,526,303
 






100,000,000
 








20,000,000
 








25,000,000
 








11,157,607
 












250,000
 










1,400,000
 










1,000,000
 










3,000,000
 








60,000,000
 








20,000,000
 








20,000,000
 








30,000,000
 










3,500,000
 












600,000
 








40,900,000
 










2,000,000
 








21,000,000
 










3,700,000
 










2,100,000
 












200,000
 










3,755,000
 










5,300,000
 










1,000,000
 








51,100,000
 










3,000,000
 








30,000,000
 










2,600,000
 








59,000,000
 








12,500,000
 








45,500,000
 








14,600,000
 








60,600,000
 












600,000
 












100,000
 












100,000
 












700,880
 














60,000
 














60,000
 














60,000
 












550,000
 












750,000
 












850,000
 












850,000
 










3,000,000
 










9,000,000
 








25,000,000
 








68,000,000
 










4,000,000
 








27,000,000


1 1 1 3 4 5 5 18 50 100 310 20 110














300,000


5














475,000


15












1,500,000


23












3,400,000


51

City

State

Program

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Construc3on
of
new
Solid
Waste
Transfer
Sta3on
‐


Several
proposed
improvements
to
the
exis3ng
facility
will
 be
incorporated
into
the
expansion
construc3on
documents
including
new
tunnel
scales,
site
drainage
 improvement
and
electrical
upgrades. Construc3on
of
Cactus
Acres
Fire
Sta3on
‐

a
new
11,000
square
foot
fire
sta3on
to
serve
central
Scofsdale
 residents. Construc3on
of
Eldorado
Fire
Sta3on
‐
New
11,000
square
feet
fire
sta3on
in
southern
por3on
of
the
City.

Project
Descrip3on

Scofsdale

AZ

CDBG

Construc3on
of
Soleri
Bridge
and
Plaza
over
the
Arizona
Canal;
includes
pedestrian
ameni3es
and
foot
plaza.

Scofsdale

AZ

CDBG

Upper
Camelback
Wash
Watershed
Flood
Project‐

Reduce
flooding
for
a
major
wash
corridor
north
of
Shea
 Boulevard,
this
project
will
remove
approximately
300
structures
from
the
100
year
flood
plain.

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Troon
North
Park
and
Dam
Construc3on
‐
Construct
a
park
on
exis3ng
34‐acre
site
with
turfed
areas,
ramadas,
 sports
courts,
and
playground.
Bring
an
earthen
dam
into
full
compliance
with
regulatory
requirements
and
 provide
regional
flood
protec3on. Renova3on
of
the
Scofsdale
Center
for
the
Performing
Arts;
including
construc3on
of
the
mezzanine.

Scofsdale Scofsdale

AZ AZ

CDBG CDBG

ADA
Improvements;
City
public
facili3es
ADA
accessibility
improvements. Reloca3on
of
historic
Stagebrush
Theater
and
construc3on
of
adjoining
10,000sf
performing
arts
facility.

Scofsdale

AZ

CDBG

Scofsdale

AZ

CDBG

Scofsdale

AZ

Energy

Scofsdale

AZ

Streets/Roads

Construc3on
of
parking
facility
for
the
SkySong
Innova3on
Center.

1000
car
parking
garage
to
support
the
 development
of
300,000
sq.
b.
office
and
retail
space. Construc3on
of
the
Scofdale
Museum
of
the
West;
a
45,000
sq.
b.
facility
to
provide
historical
exhibits
and
 educa3onal
facili3es. City
Solar
Conversion
‐
Construc3on
and
installa3on
of

photovoltaic
systems
on
city
owned
facili3es
for
 combined
energy
output
of
2.5
megawafs
of
solar
energy. Road
Construc3on
Project,
Mountain
View
Rd.
and
124th
St.,
1.1
miles,
Traffic
calming
and
rural
sidewalks

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Streets/Roads

Scofsdale

AZ

Transit

Construc3on
of
Thomspson
Peak
Parkway
Bridge,
Add
2‐lane
bridge
over
Reata
Pass
wash
to
eliminate
traffic
 constric3on
on
4‐lane
road Road
Construc3on
Project,
0.75
miles,
Indian
School
Road
‐
Drinkwater
Blvd.
to
Hayden
Rd.,
New
turn
lanes,
 pavement
reconstruc3on,
bike
lanes,
widened
sidwalks,
drainage Road
Construc3on
Project,
0.75
miles,
Scofsdale
Road
‐
Pima
Freeway
to
Thompson
Peak,
5‐6
travel
lanes,
 mul3‐use
path,
mul3‐use
trail,
raised
medians,
flood
control
protec3on Transporta3on
Construc3on
Project,
1.75
miles,
Scofsdale
Road
Streetscape
‐
Roosevelt
St.
to
Earll
Dr.

Bike
 lanes,
widened
sidewalks,
raised
medians,
streetscape Road
Construc3on
Project,
1.75
miles,
Pinnacle
Peak
Rd.
‐
Miller
Rd.
to
Pima
Rd.Widen
from
2
to
4
travel
lanes,
 turn
lanes,
bike
lanes,
sidewalks,
mul3‐use
trail,
raised
medians,
flood
control
protec3on Road
Construc3on
Project,
1.5
miles,
Pima
Rd.
‐
Thompson
Peak
Parkway
to
Pinnacle
Peak
Rd.Widen
from
4
to
 6
travel
lanes,
turn
lanes,
bike
lanes,
mul3‐use
path,
mul3‐use
trail,
raised
medians,
flood
control
protec3on Road
Construc3on
Project,
1.5
miles,
Scofsdale
Road
‐
Thompson
Peak
to
Pinnacle
Peak,
Widen
from
4
to
6
 travel
lanes,
turn
lanes,
bike
lanes,
mul3‐use
path,
mul3‐use
trail,
raised
medians,
new
bridge
and
flood
control
 protec3on Bus
Stop
Improvements,
Install
15
new
bus
shelters
and
100
new
solar
lighted
poles

Scofsdale

AZ

Water

Gainey
Wastewater
Treatment
Plant
Rehabilita3on


(Rehabilita3on/Replacement
of
aging
infrastructure)

Scofsdale

AZ

Water

Scofsdale

AZ

Water

Scofsdale

AZ

Water

Southern
Neighborhoods
Water
Quality
Improvement

(Addi3on
of
membrane
treatment
to
the
exis3ng
water
 treatment
facility) Water
Campus
Chlorine
Genera3on

(Replacement
of
gaseous
chlorine
system
at
Water
Campus
WTP
and
WRP
 with
sodium
hypochlorite
chlorine
genera3on
system) Water
distribu3on
and
sewer
collec3on
system
improvements
(Rehabilita3on/Replacement
of
aging
 infrastructure
and
increasing
the
system's
capacity
to
ensure
adequate
service
and
prevent
sewer
overflows)

Scofsdale

AZ

Water

Advanced
Water
Treatment
Plant
Expansion


(Expansion
of
membrane
treatment
following
water
reclama3on
 facility
for
recharge
efforts
to
help
ensure
long‐term
groundwater
availability
and
quality)
–
this
could
not
be
 completed
before
the
end
of
2010.

South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson

AZ AZ AZ AZ AZ

CDBG CDBG CDBG CDBG CDBG

Replacement
of
City
Fleet Replacement
of
Garbage
Containers Replacement
of
Garbage
Trucks Security
Camera
Installa3on
on
all
Public
Facili3es ADA
Compliance
rehab
of
Public
Facili3es

Transporta3on
Construc3on
Project,
Villa
Monterey
Neighborhood
Sidewalk
Ramps,
Install
sidewalk
ramps
 throughout
neighborhood Transporta3on
Construc3on
Project,
0.4
miles,
McDowell
Mountain
Ranch
Mul3‐use
Path
extension,
10'
path
 connec3ng
to
library,
aqua3c
center,
park
and
school Traffic
Management
System
Upgrades,
Accelerate
installa3on
of
new
signal
system
communica3ons
equipment
 to
facilitate
intelligent
transporta3on
system
capabilites Transporta3on
Construc3on
Project,
0.75
miles,
Cross
Cut
Canal
‐
Thomas
Rd.
to
Indian
School
Rd.,
New
mul3‐ use
path
and
pedestrian/bicycle
bridge Transporta3on
Construc3on
Project,
0.5
miles,
Indian
Bend
Wash
‐
Jackrabbit
Rd.
to
Chaparral
Rd.,
New
mul3‐ use
path
and
pedestrian/bicycle
bridge Indian
Bend
Wash
Mul3‐use
Path,

1.0
miles
‐
Pavement
replacement/widening
and
irriga3on
reloca3on
in
high‐ use
area Construc3on
of
Union
Hills
Drive
Bridge,
Add
2‐lane
bridge
over
Reata
Pass
wash
to
eliminate
traffic
 constric3on
on
4‐lane
road Hayden
Road/Camelback
Road
Intersec3on
Improvements,
Add
turn
lanes
and
pedestrian
underpass Pima
Road
Intersec3on
Improvements,
Add
new
turn
lanes
and
access
management
at
Thomas
Rd.,
Chaparral
 Rd.,
and
Indian
Bend
Rd.
along
Salt
River
Pima‐Maricopa
Indina
Community Road
Construc3on
Project,
Chaparral
Road
‐
68th
St.
to
Scofsdale
Rd.
0.5
miles,
Traffic
calming,
sidewalks,
 streetscape,
sewer
line Frank
Lloyd
Wright/Pima
Freeway
Intersec3on
Improvements,
Adjust
lane
striping,
signage
and
add
turn
lanes

Funding
Required

Jobs












4,336,000


65












6,100,000


92












6,325,000


95












7,450,000


112












8,500,000


128












9,000,000


135












9,500,000
 










8,422,000


143 156












5,000,000


180










16,500,000


245










35,000,000


585










12,000,000


180














250,000


4














250,000


4














450,000


7












1,500,000


23












1,620,000


24












1,640,000


25












1,800,000


27












2,750,000


41












2,800,000


42












3,200,000


48












3,400,000


51












3,500,000


53












3,850,000


58












6,200,000


93












7,000,000


105












7,000,000


105










21,500,000


323










23,400,000


351










26,250,000


394














325,000


5












6,000,000


78










12,000,000


156










12,000,000


156










30,000,000


390










60,000,000
 










1,500,000
 












500,000
 












250,000
 












125,000
 












500,000


780 2 2 3 3 4

City

State

Program

South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Citywide
Irriga3on
System
Improvements Economic
Development
Land
Acquisi3on Graffi3
Abatement Lead
Base
Paint
Abatement Public
Service
Employees
Staff
Shortages,
Various
Department Facade
Renova3on
Program
for
Business
Districts Weatheriza3on
and
Energy
efficiency
rehab Citywide
Street
Ligh3ng Land
Bank
for
Affordable
Housing Citywide
Sidewalk
Improvements Emergency
Home
Repair
and
Home
replacement
program
for
occupied
eligible
households

Project
Descrip3on

South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson South
Tucson St.
Johns St.
Johns

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

CDBG Energy Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Airport Airport

Brownfields
Redevelopment Electric
Powered
Vehicles
‐
Traffic
Control 172
Unit
Housing
Authority
Rehabilita3on Add
GITEM
Police
Officer City
Magistrate
Court
Security Recruit
Addi3onal
Police
Officers
and
Firefighters Fill
Vacant
Posi3ons
‐
Police
and
Fire
Departments Reten3on
Program
for
Police,
Fire
and
Support
Posi3ons Recruit
Addi3onal
Public
Works
Employees Citywide
Rehab
of
speed
humps 26th
Street/5th
Avenue
Drainage
Project
#2 26th
Street/8th
Avenue
Drainage
Project
#4 32nd
Street/2nd
Avenue
Drainage
Project
#5 40th
Street/4th
Avenue
Drainage
Project
#1 7th
Avenue/29th
Street
Drainage
Project
#3 El
Paso/SW
Greenway
Trails
System
Improvements Airport
Hangers Airport
Improvement
Project
‐
Runway
Extension,
Taxiway
Reconstruc3on,
Ramp
Rehabili3on

St.
Johns St.
Johns St.
Johns St.
Johns St.
Johns St.
Johns St.
Johns St.
Johns St.
Johns Tombstone Tombstone Tombstone Tombstone Tombstone Tombstone Tombstone Tombstone

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Airport CDBG CDBG Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads

Tombstone Tombstone Tombstone

AZ AZ AZ

Water Water Water

Tombstone Tombstone Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Housing Public
Safety

Tucson

AZ

Public
Safety

Tucson

AZ

Public
Safety

4th
West
Bridge
replacement 7th
South
sidewalk
extension Vista
San
Juan
Roadway
Improvements 1st
West
sidewalk
improvements
project City
wide
fire
hydrants
expansion
project. 4th
N.
water
distribu3on
line
extension Lifle
Reservoir
water
distribu3on
line
extension West
Bench
Sewer
line
extension Water
Quality
‐
Water
transmission
pipeline
and
new
well.
Per
facility
planning
study. Add
runway
and
purchase
addi3onal
land. Rehab
of
Old
City
Hall
as
a
tourist
afrac3on Contruc3on
of
new
Municipla
Complex Four
full
3me
paid
Firefighter/EMT Reten3on
Program
for
Public
Safety
Employees Add
to
exis3ng
fire
sta3on
addi3onal
parking
bays
and
a
class
room.
 Build
new
police
sta3on. Resurface
exis3ng
streets
with
a
chip
seal
and
construct
drainage
and
resurface
streets
that
were
improperly
 engineered
years
ago.
Install
drainage
culverts
in
dry
washs
that
have
a
poten3al
for
flooding.
 Drill
addi3onal
water
well Upgrade
catch
basin
and
security
for
springs
located
at
the
Huachuca
Mountains Install
5,000
linier
feet
of
8
inch
main
water
line
which
would
include
the
replacement
of
old
failing
water
lines
 and
installa3on
of
new
services.
This
project
would
include
all
necessary
valves
and
24
fire
hydrants Upgrade
wastewater
plant
by
adding
an
addi3onal
digester
and
drying
beds Add
a
one
million
gallons
water
reservoir. Construc3on
of
addi3onal
park
facili3es Construc3on
of
addi3onal
transi3onal
housing Construc3on
of
public
housing
at
Depot
Plaza Museums
District
Parking
&
Cultural
Plaza Solar
retrofit
of
public
housing Solar
retrofits
of
publicly
owned
buildings Urban
Parks
(Downtown
Area
Greenways) Weatheriza3on
and
energy
efficiency
housing
rehabilita3on Civic
Center
Improvements,
Parking
Garage
&
Plaza Energy
Efficient
Downtown
Central
Energy
Plant Public
Housing
Upgrades
and
Improvements
(including
security
ligh3ng) Fire
Department
opera3onal
support
facility
to
house
support
and
speciality
vehicles,
add
beds
and
store
 homeland
security
equipment
and
supplies Public
Safety
Communica3ons
Facility
Electrical
Power
capacity
improvement
to
enhance
network
and
power
 system. Public
Safety
Communica3ons
Network
infrastructure
improvements
for
fiber‐op3c
network

Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson Tucson

AZ AZ AZ AZ AZ AZ AZ AZ AZ

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

I‐10
Frontage
Road
Streetscape
Improvements Intelligent
Transporta3on
System
improvements
and
equipment Miracle
Mile
Improvements Mulitmodal
Streetscape
Improvements
to
Major
Arterials Pavement
rehabilita3on
and
preserva3on
and
water
u3lity
reloca3on Camino
Seco
roadway
construc3on Houghton
Road
Railroad
Crossing
and
Bridge Santa
Cruz
River
Bridge Cushing
Street
Bridge

Funding
Required Jobs 












250,000
 5 








10,000,000
 5 












250,000
 5 












250,000
 5 












150,000
 6 










1,000,000
 10 












100,000
 10 










1,500,000
 12 










2,500,000
 12 










1,750,000
 22 








10,000,000
 








25,000,000
 














25,000
 










1,850,000
 














32,500
 














50,000
 












150,000
 












300,000
 












250,000
 












100,000
 














50,000
 












400,000
 












925,000
 










1,250,000
 










1,750,000
 










1,350,000
 










2,000,000
 












400,000


120 180 2 10 1 1 6 8 22 6 8 15 15 15 15 15 25 40












3,000,000
 












150,000
 












250,000
 












350,000
 












360,000
 












125,000
 












200,000
 












300,000
 












380,000
 










5,800,000
 












650,000
 












750,000
 










1,000,000
 












160,000
 












250,000
 












750,000
 










1,000,000


300 15 25 35 36 13 20 30 38 580 10 20 25 4 15 25 25














650,000
 










1,000,000
 












500,000


10














450,000
 










1,000,000
 










2,000,000
 








20,000,000
 










2,000,000
 










2,500,000
 








18,000,000
 










4,000,000
 










4,000,000
 








20,000,000
 










5,000,000
 








45,000,000
 








45,000,000
 










7,000,000


10 50 100

750












2,000,000
 














45,000
 












100,000
 








34,000,000
 








30,000,000
 










6,000,000
 








25,000,000
 








45,000,000
 










8,000,000
 








10,000,000
 








12,000,000
 








16,000,000


280 350 420 560

City

State

Program

Tucson Tucson Tucson Tucson Tucson Yuma Yuma Yuma Yuma Yuma Yuma Yuma

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ

Transit Transit Transit Transit Water CDBG CDBG CDBG CDBG Public
Safety Public
Safety Streets/Roads

72
Alterna3ve
Fuel
Buses Build
out
of
bus
maintenance
and
storage
facility
to
expand
from
150
to
250
buses. Intermodal
Intercity
bus
terminal
and
transit/transporta3on
office Tucson
Modern
Streetcar
for
construc3on
to
complete
the
project CAVSARP
booster
expansion Joe
Henry
Park
Restroom
Replacement Pinto
Lane
Sanitary
Sewer
Lib
Sta3on 1st
Avenue
roadway
and
u3lity
improvements Municipal
Service
Center
Complex Public
Safety
Training
Facility Fire
Sta3on
No.
1/EMOPS
Center 24th
Street
and
22nd
Drive
(Traffic
Signal
installa3on,
turn
lane
expansion,
and
roadway
modifica3ons)

Project
Descrip3on

Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Yuma Alameda Alameda Alameda Alameda

AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG CDBG

Alameda Alameda Alameda Alameda Alameda

CA CA CA CA CA

CDBG CDBG CDBG CDBG CDBG

8th
Street
and
14th
Avenue Avenue
3E
MCAS
Guard
Rail Speese
Addi3on
Roadway 12‐16th
Street/4th
Avenue‐Avenue
A Casa
Manana Avenue
3.5E
construc3on 16th
Street
improvements 32nd
Street
Widening
3E
to
5E Arizona
Welcome
Center MSWTP
Filter
Tank
Upgrades Floccula3on/Sediment
Basins
Rehab
(3&4) MSWTP
Chlorine
Scrubber
Improvements 40th
Street
Phase
2
Water
Transmission
Lline
I‐8
to
40th
Street 5th
Avenue
Watermain
8th
to
16th
Street Water
U3lity
Security 24th
Street
Water
Storage
Tanks
and
High‐Speed
Booster
Pump
Sta3on Figuro
Digesters Avenue
A‐16th
to
24th
Storm
Drain
Replacement Rehabilitate
the
skate
board
park. Resurfacing
basketball
courts
in
Longfellow
Park
(located
in
low
income
census
tract). Resurfacing
tennis
court
in
Longfellow
Park
(located
in
low
income
census
tract).
 Upgrade
building
interior
and
refinish
360,000
sq.
b.
of
gynmasium
floor
at
Alameda
Point
Gym
(located
in
low
 income
census
tract). ADA
upgrades
to
restroom
facility
at
Encincal
Boat
ramp. ADA
upgrades
to
restroom
facility
at
Grand
Street
Boat
ramp. Replace
windows
and
trim
at
City
Hall. Replace
windows
and
trim
at
the
Veterans
Memorial
Building. ADA
upgrade
of
restroom
facility
and
lobby
at
Alameda
Point
Gymnasium
(located
in
low
income
census
tract).

Alameda Alameda Alameda Alameda Alameda

CA CA CA CA CA

CDBG CDBG CDBG CDBG CDBG

Replace
the
fence
at
Washington
Park
field. Resurface
basketball
courts
at
Washington,
Leydecker,
and
McKinley
parks. Resurface
tennis
courts
at
Washington,
Leydecker,
and
McKinley
parks. Upgrade
the
pathways,
ligh3ng,
and
landscaping
at
Neptune
Park. Fire
Sta3on
5
Rehabilita3on
(located
in
low
income
census
tract):
roof
and
windows
replacement
and
walls.

Alameda Alameda Alameda

CA CA CA

CDBG CDBG CDBG

Alameda Alameda

CA CA

CDBG CDBG

Alameda

CA

CDBG

Alameda

CA

Energy

Alameda Alameda

CA CA

Energy Housing

Rehabilitate
field
‐
Lincoln
Park. Replace
the
fence
at
Lincoln
Park
field. Upgrade
and
rehabilitate
building
interior,
including
asbestos
removal,
pain3ng,
replacement
of
carpets
and
 window
coverings,
and
ceiling
repairs
at
the
Al
DeWif
O'
Club
at
Alameda
Point
(located
in
low
income
census
 tract). ADA
park
pathway
upgrades Alameda
Landing
Phase
I:
Demoli3on

of
exis3ng
improvements,
reloca3on
of
u3lites,
and
environmental
 remedia3on
of
future
residen3al
site
(subject
to
CDBG
blight
and
brown
field
regula3ons). Restore
the
historic
Carnegie
Free
Library
for
public
use
as
the
Community
Arts/Planning
and
Building
Center.

 Relocate
the
adjacent
Foster
House
to
accommodate
a
proposed
addi3on
that
will
connect
the
Foster
House
 with
the
Carnegie
Library
and
provide
d Install
solar
hot
water
hea3ng
system
to
supplement
the
opera3on
of
a
new
energy
efficient
hot
water
system
 at
Anne
B.
Diament. Install
solar
panels
on
roof
of
the
Main
Library. Replace
the
boiler
system,
at
Anne
B.
Diament,
with
a
high‐efficiency
boiler
for
hydroponic
hea3ng
system.

Alameda Alameda Alameda

CA CA CA

Housing Housing Housing

Repaint
all
exterior
siding
and
trim;
restain
fences
and
gates
at
Eagle
Village. Repair
all
exterior
siding
and
trim,
and
restain
fences
and
gates
at
Parrot
Village. Replace
the
first
floor
kitchen
and
bath
cabinets,
including
the
community
room
at
Anne
B.
Diament.

Alameda Alameda Alameda Alameda Alameda Alameda

CA CA CA CA CA CA

Housing Housing Housing Housing Housing Housing

Alameda

CA

Housing

Construct
a
new
22‐space
parking
lot
at
the
rear
of
the
Independence
Plaza
complex. Replace
asphalt
parking
lots
(7
total)
and
driveways
at
Esperanza. Repaint
the
interior
of
all
Housing
Authority
units. Replace
kitchen
and
bath
cabinets,
counters,
and
electrical
sub
panels
at
Esperanza. Replace
roofs
and
gufers
on
all
buildings
at
Esperanza. Replace,
at
Independence
Plaza,

two
ponds,
remove
lawn,
and
re‐landscape
with
drought
tolerant
na3ve
 plants. Replace
kitchen,
bath
cabinets
and
counters
in
all
the
186
units
of
the
Independence
Plaza.

Alameda Alameda

CA CA

Housing Housing

Replace
the
interior
flooring
of
all
the
Housing
Authority
units. Replace
siding,
windows,
and
sliding
glass
doors
with
energy
efficient
glazing
in
all
units
at
Anne
B.
Diament.

Alameda

CA

Streets/Roads

Park
Street
Streetscape
improvements,
including
vintage
ligh3ng
and
street
trees,
from
Lincoln
Avenue
to
 Times
Way
and
Webb
Street;
and
Central
Avenue
to
San
Jose
Avenue.

Funding
Required Jobs 








30,000,000
 








30,000,000
 








30,000,000
 








75,000,000
 2600 










2,600,000
 












380,000
 35 










2,200,000
 35 










6,200,000
 45 








24,000,000
 250 










7,240,000
 65 










4,500,000
 150 












540,000
 












400,000
 












320,000
 












330,000
 










4,600,000
 










1,650,000
 








16,000,000
 








19,300,000
 










9,300,000
 










4,000,000
 










9,200,000
 












380,000
 












560,000
 










4,700,000
 










3,100,000
 












880,000
 








13,800,000
 










8,600,000
 










8,000,000
 












100,000
 












125,000
 












125,000


25 25 25 25 40 40 46 61 75 150 20 25 25 35 35 35 42 45 65 2 3 3














200,000
 












250,000
 












250,000
 












250,000
 












250,000


4 6 6 6 6














300,000
 












300,000
 












375,000
 












375,000
 












350,000


7 7 8 8 8












1,000,000
 












500,000
 












500,000


11 11 11














500,000
 










2,500,000


11 25












4,750,000


50












5,630,000


50














100,000
 










1,200,000


2 13














125,000
 












200,000
 












200,000


2 4 4














200,000
 












200,000
 












350,000
 










1,000,000
 










1,000,000
 












725,000


4 5 8 10 10 10














500,000


10












1,320,000
 










1,200,000


12 12












1,300,000


13














200,000


5

City

State

Program

Alameda

CA

Streets/Roads

Plant
approximately
500
new
trees
and
remove
and
replace
approximately
150
trees
throughout
the
City.

Project
Descrip3on

Alameda Alameda

CA CA

Streets/Roads Streets/Roads

Alameda Alameda Alameda Alameda Alameda Alameda Alameda

CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

ADA
construc3on
improvements
to
100
intersec3ons;
add
truncated
domes
and
ramps. Install
curb
bulb‐outs
at
Grand
Street
and
San
Jose
Avenue;
install
pedestrian
curb
ramps
in
front
of
Lum
 School;
install
lighted
mid‐block
cross
on
Grand
Street;
improve
three
public
walkways;
update
crossing
signs. ADA
sidewalk
rehabilita3on. Reconstruct
and
enhance
bicycle
trails. Improve
drainage
and
resurface
street,
Mariner
Square
Drive. Install
accessible
signals
and
pedestrian
countdown
signals
at
58
intersec3ons. Install
traffic
signals
at
three
loca3ons. Install
8,500
linear
feet
of
new
sidewalks
to
fill
in
gaps
in
pedestrian
corridors. Construct
Phase
2
of
the
Webster
Street
Streetscape
project,
including
vintage
ligh3ng
and
street
trees.

Alameda

CA

Streets/Roads

Reconstruct
approximately
1
mile
of
Central
Avenue,
including
drainage
and
sidewalk
improvements.

Alameda

CA

Streets/Roads

Alameda

CA

Alameda

Funding
Required 












300,000
 












500,000


Jobs 7 8














750,000
 










3,750,000
 












500,000
 










1,250,000
 










1,235,000
 










1,250,000
 










1,000,000


10 11 11 14 14 14 17












3,000,000


20












1,880,000


21

Reconstruct
.35
miles
of
Fernside
Boulevard,
including
drainage
and
sidewalk
improvements.












2,011,000


22

Streets/Roads

Reconstruct
approximately
1.5
miles
of
a
major
collector
in
Harbor
Bay
Business
Park.












5,000,000


28

CA

Streets/Roads

Provide
funding
match
to
construct
a
segment
of
a
new
arterial
connec3ng
State
Route
51.

Alameda Alameda

CA CA

Transit Water

Install
bus
shelters
and
related
improvements
at
18
loca3ons
throughout
the
City. Install
mechanical
trash
racks
to
clear
debris
and
reduce
flooding
at
various
storm
pump
sta3ons.












9,000,000
 












250,000


60 6














750,000


10

Alameda

CA

Water












1,700,000


19

Alameda

CA

Water

CA CA

CDBG CDBG












5,000,000
 












250,000


30

Alhambra Alhambra Alhambra

CA

CDBG

Use
shotcrete
to
improve
the
structural
stability
of
the
Southshore
Lagoon
seawalls
adjacent
to
City
public
 access:
approximately
3,000
linear
feet. Replace
riprap
and
improve
ouzalls
for
the
Harbor
Bay
Dike
and
seawall
to
protect
public
access
and
adjacent
 residences. Alley
Improvements
in
CDBG
Areas Street
Light
Conversion
to
Mul3ple
Light
Circuits
in
the
Airport
Tract
area,
south
of
Valley
Blvd.
and
west
of
 New
Avenue Street
Rehabilita3on/Construc3on:
Commonwealth
Avenue,
from
Granada

Avenue
to
Winchester
Avenue

Alhambra

CA

CDBG

Street
Rehabilita3on/Construc3on:
Main
Street,
from
the
east
City
boundary
to
the
west
City
boundary

Alhambra

CA

CDBG

Street
Rehabilita3on/Construc3on:
Raymond
Avenue,
from
Grand
Avenue
to
Mission
Road

Alhambra

CA

Energy

Alhambra Alhambra

CA CA

Public
Safety Public
Safety

Alhambra

CA

Streets/Roads

LED
Traffic
Signal
Lights
‐
75
loca3ons:
Change
from
incandescent
bulbs
to
low
emiqng
diodes
(LED)
for
 decreased
electrical
costs. Construc3on
of
an
Alternate
Emergency
Opera3ons
Center
(EOC)/Classroom Purchase
and

Installa3on
of
Digital
In‐Car
Video
Cameras
for
Police
patrol
vehicles:
includes
all
network
 hardware,
sobware,

and
servers
to
wirelessly
download
video
from
patrol

vehicles

onto
servers.
Will
assist

in
 compiling
evidence

in
DUI
and
p Street
Rehabilita3on/Construc3on:
Alhambra
Road,

from
the

east
City
boundary
to
the
west
City
boundary

Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Chapel
Avenue,
from
Woodward
Avenue
to
Hellman
Avenue












2,000,000


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Concord
Avenue,
from
Fremont
Avenue
to
the
west
City
boundary

Alhambra Alhambra Alhambra

CA CA CA

Streets/Roads Streets/Roads Streets/Roads

Street
Rehabilita3on/Construc3on:
Garvey
Avenue,
from
Ramona
Road
to
Atlan3c
Blvd. Street
Rehabilita3on/Construc3on:
Glendon
Way,
from
New
Avenue
to
Meridian
Avenue Street
Rehabilita3on/Construc3on:
Hellman
Avenue,

from
the
east
City
boundary
to
Almansor
Street












1,000,000
 










1,500,000
 










1,603,678


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Marengo
Avenue,
from
Alhambra
Road
to
Ross
Avenue












2,120,150


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Mission
Road,

from
Garfield
Avenue
to
the
west
City
boundary












2,402,082


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
New
Avenue,
from
Los
Higos/north
boundary
to
the

I‐10
Freeway












1,000,000


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Palm
Avenue,
from
Main
Street
to
Mission
Road












1,500,000


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Poplar
Avenue,
from
Fremont
Avenue
to
the
west
City
boundary












1,000,000


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Valley
Blvd.,

from
the
east
City
boundary
to
Marengo
Avenue












1,500,000


Alhambra

CA

Streets/Roads

Street
Rehabilita3on/Construc3on:
Woodward
Avenue,
from
Bushnell
Avenue
to
Almansor
Avenue

Alhambra Alhambra Alhambra

CA CA CA

Water Water Water

Garvey
Reservoir
Improvements
‐
Epoxy
Lining Longden
Well

and
Pumphouse
Rehabilita3on Sewer
Mainline
Replacement
Project:
334
linear
feet
on
Hellman
Avenue,
east
of
Garfield
Avenue














900,000
 










1,500,000
 










2,000,000


Alhambra Alhambra Alhambra Alhambra Alhambra Alhambra Alhambra Alhambra Alhambra Anaheim Anaheim Anaheim Anaheim Anaheim

CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG Energy Energy

Water
Main
Replacement
Project:
On
Avondale,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
La
Paloma,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
Meridian
(south),
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
Orange
Grove
Avenue,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
Pala3ne
Avenue,
from
Waverly
to
Vista Water
Main
Replacement
Project:
On
Warwick,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
Westminster
Avenue,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
On
Winthrop
Drive,
from
Hellman
to
Ramona Water
Main
Replacement
Project:
Westmont
Drive,
from
Hellman
to
Ramona Construc3on
of
Fire
Sta3on
No.
12
and
Neighborhood
Park

‐
Pla3num
Triangle Electrical
System
Undergrounding Anaheim
Conven3on
Center
Expansion
Project Hydroelectric
Turbine
at
Walnut
Canyon Anaheim
Conven3on
Center
‐
Water
and
Energy
Efficiency
and
Solar
Power
Retrofiqng
Project

Anaheim Anaheim Anaheim

CA CA CA

Energy Energy Streets/Roads

Water
and
Energy
Efficiency
Retrofiqng
Projects Anaheim
Solar
Flair
(Solar
Panel
placement
on
city
facili3es
and
commercial
sites) Intersec3on
Widening
Projects
‐
La
Palma
Ave
and
Kraemer
Blvd;
East
Street
and
91
Freeway

Anaheim Anaheim Anaheim Anaheim Anaheim Anaheim Anaheim Apple
Valley Apple
Valley

CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Streets/Roads Streets/Roads

Katella
Ave
Smart
Street
Roadway
Construc3on
Project Roadway
and
Highway
Infrastructure
Reconstruc3on Gene
Autry
Way
and
Interstate
5
Interchange
Construc3on
Project Thornton
Brady
Storm
Drain
Construc3on Downtown
Water
Recycling
Project
 Downtown
Sewer
Reconstruc3on
Project Water
System
Infrastructure
Construc3on
Program Dale
Evans
Parkway
rehabilita3on,
from
Johnson
Road
to
Interstate
15 Dale
Evans
Parkway
rehabilita3on,
widening
and
bike
lanes,
from
Otoe
Road
to
Waalew
Road














700,000
 










2,688,307
 










8,000,000
 












900,000
 










1,000,000
 












325,000















175,000
 










1,000,000















250,000















135,270
 












250,000
 












200,000
 












250,000
 












300,000
 










1,000,000
 












500,000
 












300,000
 












350,000
 












350,000
 








14,000,000
 








18,000,000
 






220,000,000
 










1,000,000


406 522 6000 29










10,000,000
 








18,750,000
 








24,000,000


290 522 690












3,000,000
 








15,000,000
 








35,000,000
 








32,000,000
 










3,000,000
 










5,000,000
 








20,000,000
 








28,000,000
 










3,000,000


290 580 1450 1740 87 145 1160 1537 150












3,000,000


150

City

State

Program

Apple
Valley

CA

Streets/Roads

Kiowa
Road
rehabilita3on,
widening
and
bike
lanes,
from
Bear
Valley
Road
to
Tussing
Ranch
Road

Project
Descrip3on

Funding
Required 










2,500,000
 










2,000,000


Jobs 150 150

Apple
Valley Apple
Valley

CA CA

Streets/Roads Streets/Roads

Mojave
River
Bridge
(Bear
Valley
Road)
structural
analysis
and
rehabilita3on Navajo
Road
rehabilita3on,
widening
and
bike
lanes,
from
Bear
Valley
Road
to
Tussing
Ranch
Road.

Apple
Valley

CA

Streets/Roads

Navajo
Road
rehabilita3on,
widening
and
bike
lanes,
from
State
Route
18
to
Waalew
Road.












2,500,000


150












3,000,000


Apple
Valley

CA

Streets/Roads

150

Waalew
Road
rehabilita3on,
widening
and
bike
lanes,
from
Corwin
Road
to
Navajo
Road












2,500,000


Apple
Valley

CA

Streets/Roads

150

The
Yucca
Loma
Bridge/Road
Project
will
provide
a
new
bridge
crossing
over
the
Mojave
River,
and
will
 ul3mately
connect
to
I‐15
at
the
proposed
La
Mesa/Nisqually
Interchange
in
Victorville.

It
will
create
a
new
 east/west
corridor
in
the
Victor
Valley Wastewater
Treatment
Facility
‐
2
MGD Water
Infrastructure
and
Reservoir
in
North
Apple
Valley Citywide
Slurry
Seal
Project.
Apply
Asphalt
Slurry
Seal
to
approx.
38
miles
of
city
roadways.

Apple
Valley Apple
Valley Bell

CA CA CA

Water Water Streets/Roads










40,000,000
 








18,000,000
 








15,000,000


1750 2500 2500

Bell

CA

Streets/Roads














400,000


15

Bell

CA

Streets/Roads














500,000


25

Bell
Gardens

CA

CDBG














350,000


25














750,000


Bell
Gardens

CA

CDBG

5

Bell
Gardens

CA

Energy












1,000,000


10

Bell
Gardens

CA

Energy














250,000


5

Bell
Gardens

CA

Energy












1,500,000


10

Bell
Gardens

CA

Energy












1,000,000


10

Bell
Gardens

CA

Public
Safety










10,000,000


20

Bell
Gardens

CA

Streets/Roads










17,000,000


30












2,000,000


Bell
Gardens

CA

Streets/Roads

15

Bell
Gardens

CA

Transit












2,500,000


20

Bell
Gardens

CA

Transit

Bell
Gardens

CA

Water

Bell
Gardens

CA

Water

Bell
Gardens

CA

Water

Beverly
Hills

CA

Streets/Roads

Beverly
Hills

CA

Water

Beverly
Hills

CA

Water

Beverly
Hills

CA

Water

Cathedral
City Cathedral
City Cathedral
City Cathedral
City Cerritos

CA CA CA CA CA

Housing Streets/Roads Water Water CDBG

Cerritos

CA

Energy

Cerritos

CA

Energy

Cerritos

CA

Energy

Cerritos

CA

Energy

Cerritos

CA

Energy

Cerritos

CA

Energy

Alamo
Street
Reconstruc3on.
Reconstruct
asphalt
pavement
roadway,
curb
and
gufer,
and
sidewalk
along
0.5
 mile
on
Alamo
Street.
Alamo
Street
is
a
bus
route. Filmore
Ave.
Street
Rehabilita3on.
Reconstruct
asphalt
pavement
roadway,
curb
and
gufer,
sidewalk
along
 3/10
of
a
mile
on
Filmore
Avenue. New
Energy
Efficient
HVAC
System
for
John
Anson
Ford
Park
Gymnasium. Centralized
Security
Camera
Installa3on
on
all
City
Buildings.(Sierra,
Ford
Park,
NYC,
BGV
Park,
City
Hall,
PD,
 Skate
Park) John
Anson
Ford
Park
Gymnasium
Ligh3ng
System
Upgrade
to
Energy
Efficient/Green
Indoor
Recrea3onal
 Ligh3ng. Construc3on
of
Running
Track
using
recycled
rubberized
3re
material
or
similar
recycled
product
for
the
main
 surface.
This
project
would
include
Energy
Efficient/Green
outdoor
recrea3onal
ligh3ng,
and
drought
tolerant
 landscaping.
 Energy
Efficient/Green
Recrea3onal
Park
Ligh3ng
for
east
side
of
John
Anson
For
Park.
Possibly
u3lize
Solar
 Panels
or
some
other
alterna3ve
energy
source. Energy
Efficient/Green
Public
Aqua3cs
Center
at
John
Anson
Ford
Park.
Complete
Renova3on
of
an
exis3ng
 outdoor
seasonal
olympic
size
public
pool,
to
an
indoor,
energy
efficient
olympic
size
pool
with
ligh3ng,
HVAC
 and
filtering
system
for
pool
system. Police
Sta3on
Expansion
and
renova3on
including
public
parking
improvements,
opera3onal
improvements,
 energy
efficient
ligh3ng,
green
technologies,
ADA
Compliance,
Emergency
Opera3ons
Center
and
new
 training/classroom
facili3es.
 Overlay
residen3al
streets
and
alleys
in
areas
south
of
Florence
Avenue
u3lizing
RAC
technology. Street
Paving
Rehabilita3on
including
the
use
of
Rubberized
Asphal3c
Concrete
technology,
including
local
 street
reconstruc3on
and
resurfacing,
including
concrete
sidewalk
repairs,
concrete
wheelchair
ramps
per
ADA
 standards,
Concrete
Transit
Bus
Pad Community
Electronic
Message
Boards
for
2
Main
City
Parks: Bell
Gardens
Veterans
Park
and
John
Anson
Ford
Park.
Provide
customer
informa3on
screens
about
transit
and
 community
events. Ford
Park
Transit
Center/Fixed
Route
Park
&
Ride
Lot
Improvement. This
project
involves
the
reconstruc3on,
enlargement
and
transporta3on
fixed
route
incorpora3on
of
an
exi3ng
 public
parking
lot
into
a
transit
center
"hub"
where
members
of
public
can Rehabilita3on
of
sewer
lines
and
infrastructure
that
have
already
been
iden3fied
throught
closed
circuit
TV
 inspec3on
and
hydraulic
modeling
in
accordance
with
the
City's
2008
adopted
Sanitary
Sewer
Master
Plan. Water
Main
Line
upgrades
and
replacements
in
City‐Owned
System
only.
In
accordance
with
the
City's
Water
 Master
Plan
adopted
in
2008.
12
projects
iden3fied
and
priori3zed. The
Bell
Gardens
storm
water
drainage
system
has
3
lines
in
need
of
replacement
and
upgrades.
The
Florence
 Avenue
Line
needs
to
be
replaced
and
upgraded
from
33"
line
to
a
45"
line.
The
Eastern
Avenue
Line
from
a
 12"
to
a
24"
line.
The
Ira
Avenue
line
fro Grind
and
overlay
of
City
streets
and
alleys
(45
Miles)
in
the
City
of
Beverly
Hills
selected
u3lizing
the
City's
 current
Pavement
Management
Plan
(PMP).
These
streets
were
last
rehabilitated
on
average
30
years
ago.
If
 funded
the
project
can
commence
in Replacement
and/or
rehabilita3on
of
approximately
2
miles
of
exis3ng
80
year
old
sewer
lines
throughout
the
 city.
These
sewer
lines
will
be
selected
upon
comple3on
of
our
Sanitary
Sewer
Master
Plan
which
is
currently
 being
updated
and
is
scheduled
to
b Replacement
of
the
exis3ng
60
year
old
waterline
in
Charleville
Boulevard
from
El
Camino
Drive
to
Clark
Drive.
 This
water
line
replacement
project
is
currently
under
design

and
will
be
adver3sed
for
bid
in
Feb.
2009
and
 Construc3on
will
start
in
April Replacement
of
the
exis3ng
five
50
year
old
water
reservoirs,
with
a
total
capacity
of
5.5
Million
gallons.
The
 design
of
these
tanks
is
scheduled
to
commence
in
January
2009
and
construc3on
will
start
in
July
2009.
 Date
Palm
Drive
Widening
Project Pavement
Rehabilita3on
Perez
Road South
City
Improvement
District Whitewater
Channel
Extension
43 In
accordance
with
and
required
under
California
Redevelopment
Law,
the
City
of
Cerritos
has
approved
Cuesta
 Villas,
a
247‐unit
affordable
senior
housing
development,
which
includes
a
13,000‐square‐foot
neighborhood
 senior
recrea3on
center
and
a
4‐acre
parcel Cerritos
Center
for
the
Performing
Arts
Audio
System:

Conversion
of
audio
system
from
analog
to
digital
 technology
to
achieve
a
minimum
40%
increase
in
energy
efficiency Replacement
of
Auto
Square
Signage:

upgrade
of
exis3ng
Cerritos
Auto
Square
full‐color
display
signage
with
 LED
technology;
es3mated
60%
reduc3on
in
energy
usage "Go
Green"
Supplemental
Power
System
for
Cerritos
Library:

installa3on
of
micro‐turbine
generators
in
 accordance
with
California
state
requirements,
to
prevent
blackouts
and
reduce
adverse
environmental
 impacts Replacement
of
Library
Computers:

replacement
of
150
desktop
computers
to
reduce
energy
consump3on
 and
provide
more
efficient
service
to
Library
patrons,
for
research
and
job
training
purposes Swim
Center
Environmental
Control
System:

replacement
of
25‐year‐old
boiler
with
high‐efficiency
 environmental
control
system,
to
reduce
energy
usage
by
approximately
70%
 Replacement
of
City
HVAC
System:

replacement
of
30‐year‐old
hea3ng/ven3la3on/air
condi3oning
system
at
 Cerritos
Civic
Center
to
increase
energy
efficiency
and
convenience
for
the
public














250,000













1,000,000
 










6,000,000
 










3,000,000













1,500,000


10










10,000,000


40












2,500,000


20












2,500,000


20












7,000,000
 








19,000,000
 












977,531
 








15,000,000
 










7,000,000


50 50 35 50 100










65,950,000


400














250,000


4














500,000


4














360,000


5














250,000


6














500,000


8












3,000,000


30

City

State

Program

Cerritos

CA

Energy

Cerritos

CA

Public
Safety

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Streets/Roads

Cerritos

CA

Water

Cerritos

CA

Water

Chino
Hills

CA

CDBG

Chino
Hills

CA

CDBG

Chino
Hills Chino
Hills Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Project
Descrip3on Expansion
of
Cerritos
Library:

addi3on
of
3,000
square
feet
and
incorpora3on
of
energy‐efficient
ligh3ng
 solu3ons Video
Monitoring/Public
Safety
‐‐
Cerritos
Park
Sites:

installa3on
of
up
to
200
security
cameras
at
various
park
 sites
within
Cerritos Project
No.
15100


Traffic
Signal
Coordina3on: This
project
will
provide
traffic
signal
synchroniza3on
to
approximately
50
traffic
signals
located
on
arterial
 streets
citywide. Project
No.
13016


Marquardt
Bridge
Repair/Paint This
project
includes
maintenance
and
repair
of
the
Marquardt
Bridge
at
the
Coyote
Creek
Flood
Control
 Channel. Project
No.
13086


Access
Ramps: This
project
provides
the
resources
to
upgrade
access
ramps
at
various
loca3ons
citywide
to
comply
with
ADA
 guidelines. Project
No.
14077


Arterial
Street
Slurry
Seal: This
project
will
provide
an
applica3on
of
slurry
seal
to
various
arterial
highways
in
Cerritos
as
part
of
an
 ongoing
maintenance
project. Project
No.
13032
Studebaker
Road
Construc3on
of
Landscaped
Median: This
project
provides
for
the
construc3on
of
a
landscaped
median
on
Studebaker
Road
south
of
South
Street.

 The
project
should
be
completed
in
conjunc3on
with
the
Studebaker
Road
Pa Project
No.
14031

South
Street
Pavement
Rehabilita3on
and
Construc3on
of
Landscaped
Medians:
This
 project
will
resurface
the
roadway
on
South
Street
Pioneer
Boulevard
and
Ely
Avenue
and
includes
the
 construc3on
of
landscaped
medians. Project
No.
13011
Valley
View
Boulevard
Pavement
Rehabilita3on:
This
project
will
resurface
the
southbound
 side
of
Valley
View
Boulevard
between
the
northerly
Cerritos
City
limits
and
Artesia
Boulevard.

 Project
No.
13012
Marquardt
Avenue
Pavement
Rehabilita3on:
This
project
will
resurface
Marquardt
Avenue
 between
Alondra
Boulevard
and
Artesia
Boulevard
and
includes
the
construc3on
of
landscaped
medians.
 Project
No.
13032
Studebaker
Road
Pavement
Rehabilita3on:
This
project
will
resurface
Studebaker
Road
 between
South
Street
and
Del
Amo
Boulevard.

The
scope
of
the
project
includes
replacement
of
all
necessary
 access
ramps. Project
No.
13068
Equitable/Struikman/Befencourt
Pavement
Rehabilita3on: This
project
will
resurface
Equitable
Road,
Struikman
Road
and
Befencourt
Street
between
Marquardt
Avenue
 and
Edwards
Road.

 Project
No.
13101


Del
Amo
Boulevard
Pavement
Rehabilita3on:
This
project
will
resurface
the
roadway
on
the
 westbound
side
of
Del
Amo
Boulevard
between
Denni
Street
and
the
San
Gabriel
River.

 Project
No.
13102


Keller/Fabrica/Bolsa
Streets
Pavement
Rehabilita3on: This
project
will
resurface
the
roadway
on
Keller
Circle,
Fabrica
Way
and
Bolsa
Lane
between
Artesia
Boulevard
 and
183rd
Street.

 Project
No.
13104


College
Place
Pavement
Rehabilita3on: This
project
will
resurface
the
roadway
on
College
Place
west
of
Studebaker
Road.

The
scope
of
the
project
 includes
replacement
of
all
necessary
access
ramps. Project
No.
13105

Berwyn
Road
Pavement
Rehabilita3on: This
project
will
resurface
the
roadway
on
Berwyn
Road
west
of
Valley
View
Avenue.

The
scope
of
the
project
 includes
replacement
of
all
necessary
access
ramps. Project
No.
14005


Artesia
Boulevard
Pavement
Rehabilita3on: This
project
will
resurface
the
roadway
on
Artesia
Boulevard
between
Carmenita
Road
and
Valley
View
Avenue.

 The
scope
of
the
project
includes
replacement
of
all
necessary
access
ramps. Project
No.
14088


Residen3al
Street
Pavement
Rehabilita3on This
is
an
ongoing
project
to
rehabilitate
residen3al
streets
throughout
the
City
based
upon
data
obtained
from
 the
City’s
Pavement
Management
System.
 Replacement
of
Concrete
Intersec3ons:

This
project
will
provide
for
replacing
pavement
sec3ons
at
two
 intersec3ons

within
the
Cerritos
Towne
Center
area.

The
deteriora3ng
concrete
pavements
at
the
 intersec3ons
of
Shoemaker
Street
and
Artesia
Boule Project
No.
73015
This
project
will
provide
for
replacing
an
obsolete
2‐lane
(1
lane
each
direc3on)
bridge
with
 a
4‐lane
bridge
over
Coyote
creek
along
Del
Amo
Boulevard
which
is
a
major
thoroughfare
connec3ng
Los
 Angeles
and
Orange
Coun3es. Project
No.
17028


Befencourt
Reclaimed
Waterline
replacement: This
project
will
replace
the
reclaimed
waterline
between
Befencourt
and
Rainbow
parks. Project
No.
17100


Water
Valve
Replacement
Project:
This
project
will
replace
the
water
valves
for
the
potable
 water
system
main
lines
at
various
loca3ons
citywide.
 Los
Serranos
Infrastructure
Phase
1B Los
Serranos
Water
Main
Replacement
Phase
VII
Project.

This
project
has
been
designed
and
is
ready
to
bid
for
 construc3on. Rolling
Ridge
Phase
II
Pavement
Restora3on
Project Arsenic
Remedia3on
in
City
Drinking
Wells Rienstra
Sports
Park
‐
erosion
control
improvements Loma
Verde
stairway
renova3on
for
ADA
accessibility Parks
concrete
sidewalk
renova3on,
citywide Chula
Vista
Visitor
Center
Renova3on Fire
Sta3on
No.
4
Training
Facility
‐
upgrade
exis3ng
facili3es Park
trash/recycling
enclosures,
citywide Walking/running
trail
renova3on
&
improvement
in
various
parks Memorial
park
arbor
&
water
feature
restora3on Park
restroom
construc3on/renova3on,
citywide City
trails
‐
renova3ons
and
improvements Park
irriga3on
systems
upgrades/moderniza3on,
citywide Park
restroom
replacement,
citywide Rohr
Park
jogging
trail
renova3on Sunset
View
Park
‐
dog
park
construc3on GPS
mapping
of
trail
markers
to
produce
maps
for
trailhead
kiosks
and
public
website

Funding
Required

Jobs












4,200,000


150












2,800,000


6














560,000


4














290,000


10














230,000


10














230,000


12














180,000


14














470,000


14














710,000


20












1,529,400


20














600,000


20














950,000


20












1,800,000


20














700,000


20














230,000


20














180,000


20














890,000


20












1,200,000


20














600,000


20










17,000,000


60














340,000


10














400,000


10












2,300,000


15












2,100,000
 












275,000
 












300,000
 












100,000
 












150,000
 












200,000
 












200,000
 












200,000
 












250,000
 












250,000
 












350,000
 












475,000
 












500,000
 












500,000
 












500,000
 












500,000
 












500,000
 












750,000


15 10 3 1 2 2 3 3 3 3 5 6 7 7 7 7 7 10

City

State

Program

Chula
Vista

CA

CDBG

Norman
Park
Senior
Center
equipment
&
community
mee3ng
space
&
office
space
repair/replacement

Project
Descrip3on

Chula
Vista

CA

CDBG

Greg
Rogers
Park
upgrades
‐
Irriga3on
improvements
and
storage,
picnic
shelter
and
restroom
constru3on

Chula
Vista Chula
Vista Chula
Vista

CA CA CA

CDBG CDBG CDBG

ADA
ramp
construc3on
in
various
city
parks Park
parking
lot
repaving,
citywide Rohr
Park
upgrades
‐
Irriga3on
improvements,
restrooms,
picnic
shelters
&
trash
enclosures

Chula
Vista Chula
Vista Chula
Vista Chula
Vista

CA CA CA CA

CDBG CDBG CDBG CDBG

Chula
Vista

CA

CDBG

Rohr
Manor
historical
building
repair Eucalyptus
Park
‐
add
ballfields/restore
picnic
shelters
&
restroom Chula
Vista
Nature
Center
‐
parking
lot
reloca3on,
including
acqusi3on Loma
Verde
Recrea3on
Center
renova3on/upgrades
including
children's
front
safety
area,
rear
pa3o
area
for
 community
events Women's
Club
historical
building
upgrades
&
repairs

Chula
Vista Chula
Vista Chula
Vista

CA CA CA

CDBG CDBG CDBG

All
Season's
Neighborhood
Park
construc3on Lauderbach
Recrea3on
Center
repair/replacement South
Chula
Vista
Library
‐
Patron
comfort
retrofits
&
upgrade
building
systems
to
current
energy
standards

Chula
Vista

CA

CDBG

Chula
Vista Chula
Vista Chula
Vista Chula
Vista

CA CA CA CA

CDBG CDBG CDBG CDBG

Install
6"
HP
Gas
in
Main
St.,
Oleander
to
Maxwell
and
in
Maxwell
to
serve
Chula
Vista
Transit,
Public
Works,
 Sweetwater
Union
High
School
District
CNG
fleets
and
others Ballfield
ligh3ng
upgrades
‐
install
Musco
green
ligh3ng
at
6
sites Expand
Fire
Sta3on
Training
Facility
for
"real
3me"
training Open
space
brush
clearance,
citywide Chula
Vista
Animal
Shelter
upgrades
‐
energy
retrofits
and
expansion
&
improvemetn
of
animal
holding
areas

Chula
Vista Chula
Vista Chula
Vista

CA CA CA

CDBG CDBG CDBG

Reloca3on
and
construct
new
Fire
Sta3on
No.
5
(3‐bay
facility) Lauderbach
Recrea3on
Center
parking
lot
expansion
including
property
acquisi3on Civic
Center
Library
renova3on
&
upgrade
of
bulding
systems
to
current
energy
standards
and
public
needs

Chula
Vista

CA

CDBG

Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

CDBG CDBG CDBG Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Chula
Vista Citrus
Heights

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Water Water Water Water Water Water Streets/Roads

Citrus
Heights

CA

Streets/Roads

Reconstruct
Fire
Sta3on
No.
1
as
a
5‐bay,2‐story
facility
with
a
permanent
emergency
opera3ons
center
(EOC),
 incl
equipment,
furnishings
and
communica3on Construct
Regional
Fire
Training
Facility Rancho
Del
Rey
Library
‐
construct
30,000
SF
facility Convert
mul3‐purpose
fields
from
grass
to
ar3ficial
turf
in
various
parks
citywide Interim
Emergency
Opera3ons
Center
(EOC)
upgrades Elm
Ave.
improvements
between
Naples
and
Oxford
Streets Bonita
Rd.
@
Allen
School
box
culvert
construc3on Glenhaven
street
improvements
between
1st
&
west
end Naples
St.
improvements
between
3rd
&
Alpine
Avenues 2nd
Ave.
improvements
between
Naples
&
Palomar
Streets ADA
ramps
within
RAS
&
local
streets
citywide
(design‐build) Broadway
widening/reconstruc3on,
Main
St.
to
southerly
city
limits Hilltop
Dr.
from
East
I
St.
to
Shasta
St.
drainage
improvements Oxford
St.
improvements
between
3rd
&
1st
Avenues Tree
plan3ng
&
establishment
in
parkways
citywide H
St.
CMP
storm
drain
project
between
1st
&
2nd
Avenues Third
Avenue
Village
promenade
improvements N.
Broadway
basin
storm
drain
&
st
improvements
along
Broadway
corridor
from
D
St
to
northerly
City
of
 Chula
Vista
limits ADA
ramps
within
various
RAS
&
local
streets
(design‐build) ADA
ramps
within
various
RAS
&
local
streets
(design‐build) 1st
Ave.
to
K
St.
storm
drain
construc3on
(Telegraph
Canyon
Channel) Otay
Lakes
Rd.
&
East
H
St.
widening,
Telegraph
Canyon
Rd.
to
Ridgeback
Rd. I‐805/Main
St.
undercrossing
widening 3rd
Ave.
&
L
St.
storm
drain
construc3on
(Telegraph
Canyon
Channel) CMP
replacement/rehab
within
RAS
&
local
streets
citywide CMP
replacement/rehab
within
RAS
&
local
streets
citywide Install
missing
sidewalk
citywide
within
RAS
&
local
streets Unimproved
alley
paving
program
citywide
(design‐build) I‐805
southbound
off‐ramp
improvements,
Telegraph
Canyon
Rd. Install
missing
sidewalk
citywide
within
RAS
&
local
streets Pavement
reconstruc3on
on
local
streets
citywide Pavement
overlay
on
various
City
RAS
and
local
streets
citywide Pavement
reconstruc3on/overlay
on
RAS
&
local
streets
citywide SR‐125/Rock
Mountain
interchange
(design‐build) Full
street
improvements
‐
Safe
Routes
to
School Citywide
bus
shelters
(50
priority
loca3ons) Transit
Center
improvements
@
Southwestern
College Sewer
capacity
enhancement
‐
Priority
2
projects Chula
Vista
Nature
Center
permanent
sewer/water
lines J
Street/Marina
Parkway
sewage
lib
stage
sta3on
rehabilita3on Sewage
lib
sta3on
rehabilita3on
projects Sewer
replacement
‐
Priority
1
projects Sewer
rehabilita3on
‐
Priority
1
projects Sewer
capacity
enhancement
‐
Priority
1
projects Carbon
Footprint
Reduc3on
Program
‐
Safety
Lights.

Replace
Mercury
Vapor
street
ligh3ng‐
replace
with
 induc3on
ligh3ng
along
major
arterials Pavement
reconstruc3on
and
rehabilitaion
on
Fair
Oaks
Blvd.
from
OakAvenue
to
Old
Auburn
Road

Citrus
Heights

CA

Streets/Roads

Twin
Oaks
Ave
Reconstruc3on
and
rehabilita3on;
between
Twin
Oaks
Ave.
and
SUnrise
Blvd.

Citrus
Heights Citrus
Heights

CA CA

Streets/Roads Streets/Roads

Citrus
Heights

CA

Streets/Roads

Road
reconstruc3on
and
rehabilita3on Lauppe
Lane
Drainage
reconstruc3on
and
replace
exis3ng
in‐situ
lining
of
exis3ng
detoriated
corrugated
pipe
 to
prevent
flooding Old
Auburn
Road
Reconstruc3on
and
rehabilita3on

Funding
Required 












850,000


Jobs 11














900,000
 










1,000,000
 










1,000,000


12 13 13












1,150,000
 










1,500,000
 










1,500,000
 










2,000,000


15 19 20 26












2,000,000


26












2,000,000
 










3,000,000
 










3,000,000


26 39 39












3,000,000


39












3,500,000
 










4,300,000
 










5,000,000
 










5,000,000


45 56 65 65












6,000,000
 








12,000,000
 








13,000,000


78 155 169










15,000,000


195










17,000,000
 








20,000,000
 








20,000,000
 








25,000,000
 












300,000
 










1,500,000
 










1,000,000
 










1,500,000
 










1,500,000
 










2,500,000
 










2,500,000
 










2,500,000
 










2,500,000
 










2,500,000
 










2,500,000
 










3,000,000
 










3,300,000


220 260 260 325 4 12 13 19 19 32 32 32 32 32 32 39 43












4,000,000
 










5,000,000
 










5,000,000
 










6,500,000
 










7,000,000
 










7,500,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








15,000,000
 








15,000,000
 








15,000,000
 








20,000,000
 








20,000,000
 








27,000,000
 








65,000,000
 










1,000,000
 










1,000,000
 










1,700,000
 










2,000,000
 










2,000,000
 










2,050,000
 










3,600,000
 










5,380,000
 










5,520,000


52 65 65 84 91 97 130 130 130 130 130 195 195 195 260 260 351 844 13 13 22 26 26 27 47 70 72












1,000,000


4














490,000


4














570,000
 












780,000


4 13












1,000,000


15














910,000


16

City

State

Program

Citrus
Heights

CA

Streets/Roads

Project
Descrip3on

Citrus
Heights

CA

Streets/Roads

Citrus
Heights

CA

Streets/Roads

Citrus
Heights

CA

Streets/Roads

Citrus
Heights

CA

Streets/Roads

Citrus
Heights

CA

Streets/Roads

Compton

CA

CDBG

Compton

CA

CDBG

Compton

CA

CDBG

Compton

CA

CDBG

Compton

CA

Energy

Compton

CA

Public
Safety

Compton

CA

Public
Safety

Compton Compton

CA CA

Schools Streets/Roads

Compton

CA

Streets/Roads

Compton Compton Compton Compton

CA CA CA CA

Transit Transit Transit Water

Compton

CA

Water

Covina

CA

CDBG

Covina

CA

CDBG

Covina

CA

CDBG

Covina

CA

CDBG

Covina

CA

Public
Safety

Covina

CA

Public
Safety

Covina

CA

Water

Enhanced
camera
system
‐
Provides
addi3onal
funding
for
citywide
camera
system
being
installed
in
2009.

 Would
provide
for
addi3onal
cameras,
shot
spofer
system
and
license
plate
capture
enhancements Fire
Sta3on
‐
Funding
will
allow
for
the
construc3on
of
a
new
fire
sta3on
that
will
accommodate
two
addi3onal
 pieces
of
equipment
and
allow
the
department
to
provide
adequate
fire
protec3on
for
the
east‐side
 community.
The
replacement
of
Sta3on
Two Renova3ons
and
addi3ons
to
7
elementary
schools Reconstruc3on
of
the
Rosecrans
Overhead
‐
The
City
will
reconstruct
an
exis3ng
overhead
in
order
to
facilitate
 traffic
and
circula3on
between
the
Willowbrook
Avenue
and
Alameda
Street
rail
corridors. Transporta3on
Infrastructure
Improvements
‐

Federal
funding
will
be
u3lized
to
resurface,
restore
and
 rehabilitate
deteriorated
residen3al
and
local
streets
throughout
the
Compton
community. Improve
access
to
bus
stops Real
3me
bus
informa3on Purchase
five
(5)
35'
CNG
transit
buses Storm
Drain
Compliance
Improvements
‐
In
order
to
comply
with
new
state
guidelines
to
reduce
the
 introduc3on
of
pollutants
into
Compton
Creek.

These
improvements
include:
Installa3on
of
trash
screens
on
 all
storm
drains
on
city
streets. Water
System
Improvements
‐
The
City
of
Compton
has
approximately
200
miles
of
piping
which
is
between
2”
 to
24”
in
diameter.

The
City
proposes
to
replace
40
miles
of
this
piping
to
enhance
u3lity
infrastructure. Teen
Center
Renova3on
Project
‐‐
Renovate
restrooms
for
ADA
complaince;
renovate
computer
and
movie
 rooms;
3nt
skylights
for
energey
efficiency
and
savings. Aqua3cs
Facility
Improvements
‐‐
To
improve
safety
and
energy
efficiency
includes
installa3on
of
shade
covers;
 replace
drain
per
Graeme
Baker
Pool
&
Spa
Safety
Act;
replace
hea3ng
with
enery
efficient
system;
replastering
 and
repain3ng
of
interior
of
 Covina
Park
Sport
Facility
Improvements
‐‐
Includes
renova3on
of
communiuty
basketball
courts,
sobball
 infield,
roller
hockey
rink
and
renovate
jogging
track
from
dirt
to
synthe3c
rubber. Construc3on
of
new
community/interpre3ve
sport
center
&
restora3on
of
Charter
Oak
Wash
in
the
San
 Gabriel
Watershed.
Work
in
the
wash
includes
erosion
control,
removal
of
exposed
pipe
&
non‐na3ve
plants,
 installa3on
of
signage
&
plant
na3ve
trees
al Digital
In‐Car
Video
Solu3on
‐‐
Capture
and
store
field
patrol
ac3vity.
Enhance
officer
safety
and
improve
 agency
accountability
as
well
as
advanncing
criminal
prosecu3on
and
case
resolu3on.
Aid
homeland
security
 efforts.
 Street
Crimes
Impact
Team
‐‐
With
addi3on
of
two
police
officers

SCI
Team
could
be
formed
to
address
 increased
crime
in
the
community
through
educa3on
of
community
businesses
and
neighborhoods,
increased
 technology
and
safety
measures. Charter
Oak
Reservoir
Electrical
Service
‐‐
Install
new
500
amp
3‐phase
480
volt
Y
service
with
sob
starts

Covina

CA

Water

Covina

CA

Covina

Old
Auburn
Road
reconstruc3on
and
rehabilita3on
and
construct
Class
I
Bikeway
along
Old
Auburn
Road,
 between
Fair
Oaks
and
Wachtel Sunrise
Blvd.
Pedestrian
Safety.

Infill
sidewalk
along
SUnrise
Blvd.
to
increase
pedestrian
safety
and
promote
 walkability
and
ADA
compliance Pedestrian
Safety
Project
‐
Greenback
Lane
from
Mariposa
West
to
west
of
Birdcage.

Reconstruct
center
 medians
for
pedestrainand
vehicle
safety;
install
safety
barriers
to
eliminate
illegal
foot
traffic
across
 Greenback
Lane Carbon
Footprint
Reduc3on.
Retrofit,
construct
ligh3ng
facili3es
to
allow
for
installa3on
and
use
of
solar
panels
 to
generate
energy
for
Civic
Complex
and
adjacent
street
lights. Sidewalk
and
ADA
Improvemtns.

Reconstruct
sidewalks
with
trip
hazards,
install
new
ADA
compliant
ramps
to
 improve
pedestrain
safety;
reconstruct
rolled
curbing
along
arterials,
convert
to
ver3cal
curbing
to
improve
 pedestrain
safety
and
walkability Auburn
Blvd.
Enhancement/Reconstruc3on/Rehabillata3on.

Underground

all
overhead
u3li3es
for
safety;
 widen
roadway
to
include
bicycle
lanes;
eliminate
leb
turn
lanes
and
construct
medians
for
pedestran
and
 vehicle
safety;
construct
new
ver3cal
curb Storm
Drain
Compliance
Project
‐ The
City
proposes
to
use
funds
to

comply
with
heightened
state
compliance
standards
to
reduce
trash,
 chemicals
and
sanitary
overflows
into
the
storm
sewer
system.

Sub‐elements
include:

storm
drain
screens;
 soil
filtrat Park
Improvements
‐
The
City
will
complete
the
installa3on
of

ar3ficial
surfaces
on
soccer
fields
to
reduce
 damage
and
maintenance
costs
due
to
high
usage
by
residents. “Re‐Opening
Doors
Of
Opportunity”
Program
‐
“Re‐Opening
Doors
of
Opportunity”
Employment
 Training/Placement
Program
proposes
to
implement
a
comprehensive
employment
training
and
placement
 program
to
serve
the
special
needs
popula3on
(ex‐felons,
ex‐offend Summer
Youth
Employment
Program
‐
Federal
funding
will
support
youth
summer
employment
programs.

 Program
par3cipants
will
assist
city
crews
working
on
infrastructure
improvements
through
assignment
to
an
 appren3ceship
program
targe3ng
construc3on
 Weatherize
various
City
facili3es
to
improve
energy
efficiency

Funding
Required

Jobs














900,000


16












1,180,000


16












1,500,000


20












9,000,000


35












7,000,000


40










22,000,000


250












2,500,000


10












1,500,000


15












3,000,000


24














250,000


50












1,300,000


14.44












1,500,000


20












8,000,000
 








27,000,000


72 300












3,100,000


37










23,000,000
 236 












500,000
 5.56 










1,500,000
 16.67 










2,000,000
 20












2,500,000


10










40,000,000


300
















96,700


10














220,500


20














240,000


20












1,090,000


50














200,000















241,900


2
















55,000


3

Charter
Oak
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on
pumps.
















30,000


5

Water

Cypress
Reservoir
Pump
Enclosures
‐‐
Construct
permanent
enclosures
for
water
circula3on
pumps.
















45,000


5

CA

Water

Forestdale
Reservoir
Pump
Enclosures
‐‐
Construct
permanent
enclosures
for
water
circula3on
pumps.
















30,000


5

Covina

CA

Water
















20,000


5

Covina

CA

Water

Rancho
La
Merced
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on
 pumps. Rancho
Simi
Reservoir
Pump
Enclosures
‐‐
Construct
permanenet
enclosures
for
water
circula3on
pumps.
















35,000


5

Covina

CA

Water

Roycove
Reservoir
Circula3on
Piping
‐‐
Modify
inlet/outlet
piping
to
improve
storage
tank
circula3on.
















35,000


5

Covina

CA

Water

Cypress
Reservoir
Tank
Lining
‐‐
Crack
repair
and
epoxy
coa3ng
of
exis3ng
concrete
reservoir.















250,000


10

Covina

CA

Water

Charter
Oak
Reservoir
Roof
Replacement
‐‐
Replacement
of
exis3ng
wooden
roof
with
aluminum
dome.














650,000


15

Covina

CA

Water

Cypress
Reservoir
Roof
Replacement
‐‐
Replace
exis3ng
roof
with
prefabricated
aluminum.

Cypress Cypress Cypress Cypress Cypress

CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Installa3on
of
traffic
Signal
at
Ball
Road
and
Grindlay
Street

 Intersec3on
Improvement
@
Cerritos
Avenue
and
Valley
View
Street Intersec3on
Improvement
@
Cerritos
Avenue
and
Walker
Street
 Moody
Street
Beau3fica3on


 Signal
&
Transpota3on
Improvements

















450,000
 












300,000
 












260,000
 












370,000
 










1,500,000
 










2,000,000


15 20 20 20 50 50

City

State

Program

Cypress Elk
Grove Elk
Grove Elk
Grove Elk
Grove Elk
Grove Elk
Grove Elk
Grove Elk
Grove Encinitas Encinitas Encinitas

CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Amtrak Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Street
Rehabilita3on


 Elk
Grove
Mul3modal
Sta3on
(Amtrak
Sta3on) I‐5/Elk
Grove
Boulevard
Northbound
on‐ramp
Improvement At
Grade
Crossing
Improvements
for
Dwight
and
Sims
Quiet
Zone Route
99
Bike/Pedestrian
Overcrossing Intelligent
Transporta3on
System Route
99/Elk
Grove
Boulevard
Interchange
Improvement Roadway
Rehabilita3on
on
various
City
of
Elk
Grove
streets Grant
Line
Road
Widening
(segment
of
Capital
Southeast
Connector) Citywide
sidewalk,
curb
&
gufer,
cross
gufer,
and
pedestrian
ramp
replacement Encinitas
Bl,
Leucadia
Bl,
Piraeus
St
&
San
Elijo
Bl
overlays Encinitas/North
County
Transit
District
transit
parking
lot
(located
on
South
Vulcan
Av
&
E
St

Project
Descrip3on

Encinitas Encinitas Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom

CA CA CA CA CA CA CA CA CA CA

Water Water CDBG CDBG Housing Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Corrosion
protec3on
for
ten
underground
u3lity
vaults Fourth
St
storm
drain Folsom
Senior
Center
Expansion. Folsom
Sports
Complex
Second
Floor
Expansion Willow
Creek
Village.

 Fire
Sta3on
#39.

Construct
LEED‐cer3fied
fire
sta3on. Bike
Boulevard
at
School,
Dean,
and
Coloma
Streets Blue
Ravine
Rd./Folsom
Blvd.
Roadway
and
Bike/Ped
Improvements Blue
Ravine
Road
Widening Bridge
below
Folsom
Dam
Phase
2.

Widen
approach
and
construct
bike/pedestrian
access.

Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom Folsom

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Water Water Water

Bridge
below
Folsom
Dam.

Complete
construc3on
of
Folsom
Lake
Crossing. East
Bidwell
Bike/Pedestrian
Overcrossing. Folsom
Historic
District
Streetscape
Improvements. Folsom
Parkway
Rail
Trail. Folsom
Placerville
Rail
Trail
‐
Regional
Segment. Folsom
Placerville
Rail
Trail. HBWC
Trail. Intelligent
Transporta3on
Systems.
Citywide
Fiber
Op3c
Network
for
traffic
control. Lake
Natoma
Trail
Gap
Closure. Riley
Street
Corridor
Improvements. Roadway
rehabilita3on.

Various
loca3ons
throughout
City. US
50
Empire
Ranch
Road
Interchange.

Construct
interchange. Folsom
Stage
Lines
Van
Replacement. Lightrail
Park
&
Ride
Lot
Expansion
at
Iron
Point. Folsom
South
Canal
Intake
and
Conveyance. Major
drainage
infrastructure
rehabilita3on,
replacement,
and
construc3on. Sewer
rehabilita3on
in
older
sec3ons
of
City. Water
Infrastructure
Rehabilita3on.

Rehabilita3on
throughout
City,
including
leak
detec3on
and
mi3ga3on.

Fountain
Valley Fountain
Valley

CA CA

Energy Streets/Roads

Fountain
Valley

CA

Streets/Roads

Fountain
Valley Fountain
Valley Fresno

CA CA CA

Water Water CDBG

Fresno

CA

CDBG

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Streets/Roads

Fresno

CA

Water

Glendora Glendora Glendora Glendora Glendora

CA CA CA CA CA

CDBG CDBG CDBG CDBG CDBG

Hybrid
HVAC/Night
Shib
system
with
solar
powered
air
handlers Sidewalk
Removal
and
Replacement
‐
fixes
damaged
sidewalks
that
create
hazardous
walking
condi3ons
for
 pedestrians
and
trip
and
fall
claims
against
the
City
and
other
local
agencies. Residen3al
Pavement
Rehabilita3on
Project
‐
many
of
ours
are
40‐50
years
old
and
have
passed
their
useful
 service
life.
They
are
in
need
of
more
than
a
slurry
or
cape
seal.
We
began
this
program
just
this
past
year,
but
 we
have
a
substan3al
backlog
to Sewer
Lib
Sta3on
on
Ward
St. Pump
Sta3ons
(2) Downtown
and
Citywide
Landscape
Irriga3on.

Many
tree
wells
and
streetscape
areas
are
without
irriga3on
 systems
in
place.

Connect
to
water
supply,
plumbing
to
benefit
areas,
installa3on
of
water
conserva3on
 appropriate
irriga3on
systems,
etc. Neighborhood
improvement
program.

Economically
challenged
and
older
neighborhoods
need
street,
 sidewalk,
curb,
gufer,
streetlight,
pedestrian
support,
landscape,
and
drainage
improvements. Shaw
&
Polk
Intersec3on
Improvements.

Expansion
of
intersec3on,
right‐of‐way
acquisi3on,
signaliza3on
 enhancements,
streetscape
and
hardscape
improvements. Ashlan
Avenue
west
of
Freeway
99.

Street
widening,
right‐of‐way
acquisi3on,
paving,
curbs,
sidewalks,
and
 gufer. Willow
Avenue,
Shepherd
to
Behymer.

Extends
street
infrastructure
improvements
to
the
north
that
currently
 terminate
at
Shepherd.

Curb,
sidewalk,
gufer,
undergrounding
of
verhead
u3li3es,
trail,
and
pavement. Clovis
Avenue,
McKinley
to
Kings
Canyon.

Improvement
to
travel
lanes,
median
islands,
bridge
crossings,
 sidewalks,
gufers,
and
trails. Bofleneck
removal.

Six
loca3ons
in
the
City
where
short
undeveloped
areas
have
created
travel
lane
 boflenecks
(two
lanes
down
to
one,
and
then
back
to
two)
on
major
streets.

Tight‐of‐way
acquisi3on,
paving,
 curbs,
sidewalks,
and
gufer. California
Avenue.

Shelf
ready
roadyway
enhancement
project
that
supports
a
Hope
VI
project.

Street
 widening,
median
island
construc3on,
landscape,
and
pavement
improvement. Friant
Road,
Copper
to
Audubon,
southbound
lanes.

These
travel
lanes
support
industry
and
heavy
trucks,
as
 well
as
residen3al
commuter
traffic.

Overlay
paving,
other
structural
support
work,
and
curbing
to
help
 prevent
future
water
erosion. Herndon
Canal
Pipeline.

Undergrounding
of
open
canal
for
roadway
improvement,
pedestrian
safety,
and
 water
quality
protec3on. Development
of
solar
energy
recep3cles
over
parking
stalls
at
Pompei
Regional
Park Sewer
reconstruc3on
on
Laurel
Avenue Sewer
reconstruc3on
on
Palopinto
Avenue. Sewer
reconstruc3on
on
Treanor
Avenue Sewer
reconstruc3on
on
Barranca
Avenue
associated
with
the
Monrovia
Nursery
Estates
area

Glendora Glendora

CA CA

CDBG CDBG

Sewer
reconstruc3on
on
Lorraine
Avenue Sewer
reconstruc3on
on
Valley
Center
Avenue

Funding
Required Jobs 










2,500,000
 50 










7,000,000
 279 












200,000
 8 












500,000
 20 










3,000,000
 120 










5,000,000
 199 










9,000,000
 359 








10,000,000
 398 








30,000,000
 1195 












400,000
 10 










3,000,000
 30 










1,000,000
 












100,000
 












900,000
 










3,750,000
 










4,800,000
 










5,700,000
 










3,600,000
 












850,000
 










5,350,000
 










1,250,000


35 5 15












5,250,000
 










2,500,000
 












850,000
 










4,000,000
 










3,200,000
 








18,950,000
 












950,000
 










1,200,000
 










1,800,000
 










3,250,000
 










2,000,000
 










2,428,557
 








37,000,000
 












488,000
 










1,000,000
 








20,000,000
 










2,200,000
 










6,875,000
 








12,000,000
 












800,000


5












1,000,000


10












2,000,000
 










2,500,000
 










5,000,000


20 10 20












4,000,000


20










27,000,000


50












1,400,000


5












2,000,000


7












2,000,000


7












2,500,000


9












3,000,000


10












3,900,000


10












3,500,000


10














700,000
 












975,000
 












425,000
 












390,000
 












400,000


8 20 25 25 25












1,950,000
 












975,000
 










1,250,000


30 30 30

City

State

Program

Glendora

CA

CDBG

Project
Descrip3on

Glendora

CA

CDBG

Glendora Glendora

CA CA

CDBG CDBG

Glendora

CA

CDBG

Glendora

CA

CDBG

Glendora Glendora

CA CA

Energy Energy

Glendora

CA

Public
Safety

Glendora Glendora Glendora Glendora Glendora Glendora Glendora Glendora Glendora Glendora Glendora Glendora

CA CA CA CA CA CA CA CA CA CA CA CA

Public
Safety Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water

Glendora

CA

Water

Police
Department
Building
Renova3on.

The
building
was
built
in
the
1960
when
the
popula3on
was
one‐third
 of
what
it
is
today.

The
facility
is
undersized
and
inadequate
for
the
city's
public
safety
needs.

Replacement
 would
provide
sufficient
room Solar
power
panel
funding
to
assist
small
business
owners
with
the
installa3on
costs. Solar
power
panel
funding
to
assist
low
and
moderate
income
house
hold
owners
with
installa3on
costs
for
 energy
reduc3on. Replacement
of
a
school
resource
officer
posi3on
which
was
lost
when
the
school
district
had
to
cut
funding
 due
to
state
budget
cut
backs CAD,
GIS
and
Records
Management
system
upgrades School
energy
efficiency,
including
solar
panel
installa3on,
program Reconstruc3on
of
Foothill
Boulevard
between
Grand
Avenue
and
Cullen
Avenue Reconstruc3on
of
Glendora
Avenue
between
Sierra
Madre
Avenue
and
Foothill
Avenuen Reconstruc3on
of
Arrow
Highway
between
Valley
Center
and
Grand
Avenue Reconstruc3on
of
Gladstone
Street
between
Grand
Avenue
and
Sunflower
Avenue Reconstruc3on
of
City
Alley's
throughout
the
City
that
are
substandard. Reconstruc3on
of
Route
66
between
Barranca
Avenue
and
Lone
Hill
Avenue Foothill
Avenue
Water
Line
reconstruc3on
between
Grand
Avenue
and
Cullen
Avenue Juanita
Avenue
Water
Line
reconstruc3on. Water
Nitrate/Percholorate
Treatment
Plant
for
Irwindale
Water
Well
Site Sierra
Madre
Avenue
Water
Line
reconstruc3on
between
Barranca
Avenue
and
Lone
Hill
and
the
various
 feeder
lines
into
the
foothill
popula3on
areas.
 Water
Tank
Emergency
Reservior
at
three
loca3ons

Hayward

CA

Airport

Skywest
T‐Hangars
‐
Construct
42
new
T‐Hangars

Hayward

CA

Airport

Hayward

CA

Amtrak

Hayward

CA

CDBG

Hayward

CA

CDBG

Runway
Safety
Project
‐
Construc3on
of
the
proposed
depressed
roadway
to
eliminate
poten3al
clearance
 conflict
at
end
of
runway. Tennyson
Road
Grade
Separa3on
Bridge
at
UPRR
to
eliminate
vehicle
and
train
traffic
conflict
and
improve
 pedestrian
safety Cannery
Area
Pedestrian
Bridge
‐
This
pedestrian
bridge
over
Union
Pacific
Railroad
will
provide
a
safe
and
 direct
access
between
the
residen3al
community
and
Centennial
Park. New
City
Plaza
‐
To
construct
a
new
City
Plaza
in
the
downtown
area
for
community
gatherings.

Hayward

CA

CDBG

Hayward

CA

Energy

Hayward

CA

Hayward Hayward

Parking
Structure
for
the
La
Fetra
Senior
Center.

The
center
is
underpark
for
the
amount
of
patrons
using
the
 facility
due
this
high
volume
and
the
use
of
the
park
which
serves
as
a
primary
place
of
girls
sobball
ac3vi3es. Parking
Structure
in
the
Glendora
Downtown
Village/Bus
Plaza
lots.

This
would
add
approximately
120
spaces
 and
thus
allow
businesses
to
expand
or
locate
in
this
historic
area
without
need
for
providing
parking
area Sewer
reconstruc3on
on
Foothill
Avenue
between
Barranca
Avenue
and
Valley
Center Various
water
conserva3on
projects
associated
with
the
Glendora
and
Charter
Oak
Unified
School
District.

 Such
a
program
would
become
a
win‐win
for
all
en33es.

The
schools
are
facing
budget
shorzalls
and
any
 money
they
can
save
in
water
and
facility
 Sewer
reconstruc3on
on
Arrow
Highway
between
Valley
Center
and
Barranca
Avenue.

Funding
Required

Jobs












1,900,000


35












2,490,000
 










1,800,000


55 55












3,000,000


75












2,750,000


125










14,500,000
 












975,000


250 45












1,950,000


55














250,000
 










2,490,000
 










4,500,000
 










1,800,000
 












750,000
 










2,900,000
 










2,000,000
 










3,000,000
 










3,000,000
 










1,900,000
 










1,950,000
 










5,750,000


2 11 155 15 15 17 17 22 30 35 45 55












4,500,000


60










12,000,000


155












6,500,000


120










34,000,000


250










13,500,000


300












2,500,000


80










12,000,000


200

New
Main
Library
‐
Construct
a
new
main
library
to
replace
an
outdated
50‐year
old
exis3ng
facility.










30,000,000


300

Traffic
Controllers
‐
Replace
all
150
traffic
controllers
with
new
state
of
the
art
controller
system












1,500,000


40

Energy

LED
Street
Lights
‐
Replace
street
lights
with
LEDs
Citywide.












8,000,000


150

CA

Energy

Solar
Energy
Genera3on
for
various
City
Facili3es












4,000,000


200

CA

Energy

Waste
Water
Treatment
Plant
1MW
Photovoltaic
System












8,000,000


200

Hayward

CA

Public
Safety












3,500,000


40

Hayward

CA

Public
Safety

CAD/RMS
‐
A
new
Computer
Aided
Dispatch/Records
Management
(CAD/RMS)
system
to
support
public
safety
 with
police
and
fire
dispatch. New
Fire
Sta3on
No.7
‐
Construct
a
new
fire
sta3on
to
replace
an
exis3ng
temporary
facility.










10,000,000


100

Hayward

CA

Public
Safety

New
Police
Facility
‐
Construct
a
new
police
facility
to
replace
the
exis3ng
40‐year
old
sta3on.










75,000,000


350

Hayward

CA

Streets/Roads










10,000,000


100

Hayward

CA

Streets/Roads

Neighborhood
Streets
Improvements
‐
Improvements
to
include
pavement
reconstruc3on
and
drainage
system
 improvements. Pavement
Rehabilita3on
‐
City‐wide
pavement
rehabilita3on,
including
reconstruc3on
of
some
streets

Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules Hercules

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Amtrak CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Public
Safety Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water

Construct
Capitol
Corridor
Rail
Sta3on
and
Train
Track
Improvements Complete
Bike
Lane
Willow
Ave./State
Route
4
to
San
Pablo
Ave. Hanna
&
Lupine
Childcare
Playgrounds
‐
Repairs
and
Upgrades Corpora3on
Yard
Area
Mi3ga3on
and
Future
School
Site
Prep Repair
Landslide
at
Lupine Construc3on
of
Pedestrian
Access
to
Mass
Transporta3on
Facili3es Historic
Buildings
Rehabilita3on
&
Renova3on Construc3on
and
Renova3on
of
City
Parks Sycamore
Main
Street
Project
Construc3on U3lity
Capital
Projects Waterfront
Area
Police
Substa3on Rehab
Classroom
at
Ohlone
Childcare
Center Construct
Busway
for
BART
Parcel
at
New
Town
Center
Project Construct
John
Muir
Parkway
Phase
2
and
Bayfront
Bridge Construct
Roundabout
Willow/Palm Re‐engineer
Freeway
Ramps
@
Willow
Ave./Highway
4 Intersec3on
and
Arterial
Improvements Bay
Area
Rapid
Transit
(BART)
/
New
Town
Center
Development Construct
Transit
Parking
at
Intermodal
Transit
Center Construc3on,
Expansion,
Maintenance
&
Mi3ga3on
of
Wastewater,
Sewer
and
Flood
Projects










33,000,000
 










6,000,000
 














14,808
 












100,000
 












280,000
 










1,500,000
 










2,636,700
 










3,400,000
 










4,544,250
 








38,940,630
 










3,273,841
 










1,000,000
 














30,000
 










2,804,985
 










3,200,000
 










5,077,422
 










7,609,600
 








19,152,807
 








10,437,622
 








16,000,000


350 216 1 4 10 54 95 129 164 1402 118 36 1 101 115 173 259 651 355 576












6,910,243


322

Hun3ngton
Beach

CA

CDBG














250,000


10

Hun3ngton
Beach

CA

CDBG












3,800,000


40

Hun3ngton
Beach

CA

CDBG

Oakview
Community
Center
Improvements:
permanent
modular
facility
for
YMCA
office
to
offer
outside
and
 inside
recrea3ons
programs
at
the
center ADA
Improvements:
citywide
ADA
compliant
modifica3ons
to
public
facili3es
such
as
senior
center,
community
 centers,
clubhouses,
libraries,
park
and
playground
facili3es Street
and
alley
maintenance:
pavement
replacement
residen3al
streets
and
alleys
in
CDBG
areas












4,000,000


40

City

State

Program

Hun3ngton
Beach

CA

Energy

Project
Descrip3on

Hun3ngton
Beach

CA

Energy

Hun3ngton
Beach

CA

Energy

Hun3ngton
Beach

CA

Energy

Hun3ngton
Beach

CA

Energy

Hun3ngton
Beach

CA

Energy

Hun3ngton
Beach Hun3ngton
Beach

CA CA

Public
Safety Public
Safety

Hun3ngton
Beach

CA

Streets/Roads

Hun3ngton
Beach Hun3ngton
Beach Hun3ngton
Beach

CA CA CA

Streets/Roads Streets/Roads Water

Hun3ngton
Beach

CA

Water

Hun3ngton
Beach Hun3ngton
Beach

CA CA

Water Water

Hun3ngton
Beach

CA

Water

Hun3ngton
Beach

CA

Water

Hun3ngton
Beach

CA

Water

Indio

CA

CDBG

Install
Automated
Meter
Reading
capabili3es
(citywide
approximately
50,000
meters)
to
reduce
emissions
 from
meter
reading
vehicles Sewer
Lib
Sta3on
reconstruc3on
replace
2
40
+
year
old
sewer
lib
sta3ons
with
higher
capacity,
more
energy
 efficient
facility
which
will
help
avoid
poten3al
sewer
discharges
into
wetlands
or
ocean Indio
Learning
Center.
New
facility
and
City
provided
service
in
conjunc3on
with
City
Library.



Indio

CA

CDBG

Indio
Sports
Complex.

Acqua3c
center,
baseball
fields,
soccer
stadium,
and
recrea3onal
ameni3es.

Indio

CA

CDBG

Police,
Fire,
and
Emergency
Opera3ons
Headquarters.
Public
building
expansion
and
service
enhancement.


Indio

CA

Energy

Photovoltaic
technology
Senior
Center.
Self
power
genera3ng.
Design
complete.

Indio

CA

Streets/Roads

Miles
Avenue
between
Madison
and
Clinton
street
capacity
enhancement.
Design
complete.

Indio

CA

Streets/Roads

Avenue
46
Pavement
Rehabilita3on.
Madison
Street
to
Monroe
Street.
Design
Complete

Indio

CA

Streets/Roads

Indio
Boulevard
Bridge
seismic
retrofit
and
moderniza3on.

At
Storm
Channel.

Design
Complete.


Indio

CA

Streets/Roads

Jackson
Street
Bridge
seismic
retrofit
and
moderniza3on.

At
union
Pacific
Railroad.
Design
Complete

Indio

CA

Streets/Roads

Monroe
Street
at
Interstate
10
Traffic
Signals.
Design
Complete.

Indio

CA

Streets/Roads

Indio

CA

Streets/Roads

Avenue
42
Widening
from
Clinton
Street
to
Gore
Street
capacity
enhancement
and
storm
drain.
Design
 Complete Golf
Center
Parkway

pavement
rehabilita3on
and
capacity
enhancement.

Connects
to
Interstate
10.
Design
 Complete.

Indio

CA

Streets/Roads

Indio

CA

Streets/Roads

Indio

CA

Streets/Roads

Monroe
Street
to
Interstate
10
Pavement
Reconstruc3on.


Indio

CA

Streets/Roads

Indio

CA

Indio

City
&
SCE
owned
Street
&
pole
light
&
purchased
u3lity
meter
inventory,
audit
and
Geographical
Informa3on
 System
(GIS)
input. Retrofit
City
Facili3es
to
allow
par3cipa3on
in
next
genera3on
Demand
Response
Programs.

(create
A/B
 circuits
on
ligh3ng
circuits,
install
3meclock
&
controls
on
fountain
pumps,
oil
pumps,
etc.) Hun3ngton
Beach/Goldenwest
College
training
center
of
excellence
for
energy
efficiency
&
renewable
energy,
 providing
trained
and
re‐trained
green
collar
workers
(30
qualified/re‐trained
employees
annually) Replace
high
voltage
downtown
streetlight
system
with
energy
efficient
ligh3ng

Funding
Required

Jobs














150,000


4












1,000,000


25














500,000


30












3,500,000


35












4,000,000


50










15,200,000
 












170,000


65 5














500,000


15












2,500,000
 








10,000,000
 










8,000,000


30 50 80












2,000,000


20












2,500,000
 








10,000,000


25 40












4,500,000


45












2,500,000


50










10,000,000


50












5,000,000


50












2,000,000


75










10,000,000


250










10,000,000


250












1,000,000


50














225,000


25












1,200,000


50












1,200,000


65












1,930,000


65














900,000


65












5,300,000


100












3,000,000


100












4,100,000


100












2,500,000


100












6,800,000


100

Varner
Road
at
Jefferson
Street
capacity
enhancement
and
paving.












3,200,000


100

Streets/Roads

19
Traffic
Signal
Moderniza3on
Projects












5,500,000


200

CA

Transit

The
Indio
Transporta3on
Center‐‐first
regional
mul3modal
facility
for
train,
bus,
and
auto
uses.












2,000,000


50

Indio

CA

Transit












1,500,000


50

Indio

CA

Water

Union
Pacific
Railroad
Spur
Capacity
Enhancement.

Rail
enhancements
to
allow
for
increased
Amtrak
 Passenger
rail
service
and
to
facilitate
goods
movement.
 Royal
Dornoch
Drive
Pipeline
capacity
expansion.

Installa3on
of
new
pipeline
to
increase
water
capacity.

















98,000


45

Indio

CA

Water

Showcase
East
Pipeline.

Capacity
expansion
and
new
line
installa3on.

Design
Complete.















150,000


45

Indio

CA

Water

Polyethylene
Water
Service
Replacement
Program.
Rehabilita3on.














500,000


50

Indio

CA

Water

Water
Well
1D
rehabilita3on
and
expansion.
Design
complete.














900,000


50

Indio

CA

Water

Water
Well
1E
rehabilita3on
and
expansion.
Design
complete.
 












900,000


50

Indio

CA

Water

Avenue
44
and
White
Water
Storm
Channel
Drain
enhancement.














1,500,000


75

Indio

CA

Water

Avenue
48
and
Dillon
Road
Storm
Drain
capacity
enhancement.














1,000,000


75

Indio

CA

Water

Hydrant
Replacement
Program

for
aging
hydrants
in
disrepair.
Design
complete.












4,350,000


75

Indio

CA

Water

Miles
Road
Bridge
Pipeline.

Capacity
expansion.
Design
complete.
















516,500


75

Indio

CA

Water

Water
Well
13A
rehabilita3on
and
expansion.

Granite
Hills
reservoir.
Design
complete.












1,600,000


75

Indio

CA

Water

Water
Well
2E
rehabilita3on
and
expansion.

On
highway
111.
Design
complete.












1,920,000


75

Indio

CA

Water

Water
Plant
3‐
2.5
Million
Gallon
Reservoir,
capacity
expansion.













3,120,000


100

Phase
2
energy
projects‐retrofit
all
city
owned
and
operated
facili3es
to
achieve
best
in
class
energy
efficiency
 performance.
Ligh3ng
systems
redesign
&
retrofit,
HVAC
systems,
controls,
outdoor
security
ligh3ng,
u3lity
 infrastructure. Hun3ngton
Beach
Large
Scale
Photovoltaic
purchase.

Install
2.5
MW
of
photovoltaic
systems
across
selected
 appropriate
sites
in
the
city. Purchase
Handheld
MDT’s/Ticket
Writers
for
the
foot
beat
officer


 Install
hydraulic
balusters
at
downtown
intersec3ons
for
crowd
protec3on
during
special
events Bridge
rehabilita3on‐make
infrastructure
repairs
to
8
local

bridges
that
cross
harbor
water
and
flood
control
 channels Replace
15

miles
of
arterial
block
walls Arterial
street
and
alley
rehabilita3on‐
improve
local
arterial
and
residen3al
roads Upgrade
water
pumping
equipment
by
installing

2
pumps
and
engines.

Result
will
improve
reliability
and
save
 energy. Install
security
systems
at
water
pumping
and
storage
facili3es,
wastewater
pumping
facili3es,
&
flood
control
 pump
sta3ons Upgrade
20
flood
sta3on
pumps
and
engines
to
improve
reliability
and
energy
savings. Storm
drain
pump
sta3on
construc3on‐
construct
a
higher
capacity
storm
water
pump
sta3on

to
replace
the
 exis3ng
undersized
40
+
year
old
sta3on. Divert
dry
weather
urban
runoff
from
County
Channel
through
treatment
pools
to
Talbert
Lake.

Madison
Street
at
Indio
Boulevard
to
Avenue
50
widening,
pavement
reconstruc3on
and
u3lity
reloca3on.
 Design
complete Monroe
Street
at
Avenue
49
to
Avenue
52
widening
,
pavement
reconstruc3on,
and
u3lity
reloca3on.
Design
 complete.


City

State

Program

Indio

CA

Water

Lost
Horse
Water
Reservoir
Project
Capacity
Expansion.

Project
Descrip3on

Inglewood

CA

Airport

Inglewood

CA

Airport

Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood Inglewood

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

Inglewood

CA

Public
Safety

Inglewood Inglewood Inglewood

CA CA CA

Streets/Roads Streets/Roads Streets/Roads

Inglewood

CA

Streets/Roads

Inglewood

CA

Transit

Inglewood

CA

Water

Inglewood

CA

Water

Inglewood

CA

Water

Irvine

CA

Energy

The
Noise
Mi3ga3on
Recycling
Program:
This
program
has
an
es3mated
funding
of
$25,000,000.

At
least
four
 consultants
will
include
acquisi3on,
reloca3on,
abatement
and
demoli3on.

Addi3onally,
three
staff
person
will
 be
required
for
program
implementa3on RSI
Demonstra3on
Home:
This
idea
assumes
addi3onal
staff
and
another
consultant
for
construc3on
 management
as
indicated
above.

Addi3onal
personnel
would
trigger
physical
constraints
within
the
 department
and
demand
for
office
space.
 Residen3al
Sound
Insula3on
in
accordance
with
the
City’s
adopted
Aircrab
Noise
Mi3ga3on
Program:
The
City
 Park
Rangers:
Federal
funding
will
provide
for
park
rangers
to
enforce
park
rules
and
regula3ons,
unlock
and
 City's
Weed
and
Graffi3
Abatement
Program:

This
program
will
provide
employment
opportuni3es
for
at
least
 Public
Service
Employees
(PSE)
Program:
The
City
of
Inglewood
is
currently
experiencing
staff
shortages
in
 Park
Improvements

‐
Federal
funding
will
provide
for
the
installa3on
of
ar3ficial
surfaces
on
soccer
fields
at
 Rogers
Park
Improvement
Project:

This
project
will
provide
for
park
improvements
including
the
roof,
HVAC
 Solar
Housing
Energy
Program:
This
project
installs
solar
energy
systems
in
homes
for
very
low‐income
senior
 The
Inglewood
Youth
Employment
and
Training
Program:
This
program
will
be
targeted
to
youth
between
the
 Inglewood
CARE
Program:
The
Commercial
Area
Revitaliza3on
Effort
(CARE)
is
a
comprehensive
program
 Parks
Energy
Enhancements:
This
project
will
provide
new
electrical
panels,
conduits,
transformers
and
needed
 Civic
Building
Alterna3ve
Energy
Renova3ons:
This
project
includes
energy
renova3ons
for
City
Hall,
Main
City
 In‐Car
Cameras
–
The
Police
Department
needs
to
replace
an
obsolete
in‐car
camera
video
system
in
its
first
 Interoperable
Radio
System
and
Data
Communica3ons
System
–
the
Police
Department
needs
to
replace
an
un‐ Public
Video
Monitoring
–
The
Police
Department
needs
to
acquire
a
remote
camera
system
sufficient
to
cover
 Shotspofer
System
–
The
Police
Department
needs
to
improve
its
inves3ga3ve
capabili3es
by
using
technology
 Police
Auto
Mechanics
–
The
Police
Department
needs
dedicated
general
auto
mechanics
to
ouzit
and
 Homeless
Interven3onist
–
The
Police
Department
needs
a
staff
of
trained
mental
health
professionals
and
 Informa3on
Technology
Technicians
–
The
current
use
of
equipment
and
planned
procurements
of
 Forensic
Personnel
–
The
Police
Department
needs
an
addi3onal
5
forensic
specialist
to
provide
adequate
18‐ Custody
Officers
–
The
Police
Department
needs
an
addi3onal
6
(1
supervisor
+
5
custody
officers)
custody
 Parks
Safety
Program:Federal
funding
will
provide
for
the
installa3on
of
security
surveillance
and
Hirsch
access
 Community
Service
Officer
(CSO)
–
A
non‐sworn
posi3on
assigned
to
complete
no‐lead
burglary
inves3ga3ons,
 other
non‐violent
misdemeanor
property
crime
inves3ga3ons,
and
minor
traffic
collision
inves3ga3ons.
 Police
Officer
and
Part‐3me
Inves3gators
–
The
Police
Department
needs
to
increase
police
officer
staffing
by
 30
posi3ons.

These
addi3onal
police
officers
will
be
deployed
within
our
redeveloping
concentrated
business
 districts City‐wide
Street
Resurfacing
program
‐
This
is
a
street
resurfacing
program
of
street
pavement
and
adjacent
 City‐wide
Sidewalk
replacement
and
Pedestrian
Ramp
program
‐This
is
a
sidewalk
replacement
and
pedestrian
 City‐wide
Alleyway
replacement
program
‐
This
is
a
alleyway
replacement
program
to
replace
aged
 infrastructure. La
Brea
Avenue
Pavement
Reconstruc3on,
Ph.2
‐
Project
provides
for
full
pavement
reconstruc3on
of
major
80
 year
old
thoroughfare
and
improves
driving
characteris3cs
with
intelligent
transporta3on
system
 enhancements. Asphalt
Zipper
‐
Equipment
to
improve
street
longevity/reliability
by
enhancing
roadway
maintenance
&
repair
 opera3ons. Fluorida3on
treatment
facility
‐
Project
provides
for
fluorida3on
of
pumped
groundwater
to
match
fluoridated
 imported
water
supply
and
enhance
water
quality. Water
Treatment
Plant
Expansion
‐ Project
expands
current
capacity
of
8.3
MGD
to
12
MGD
to
provide
ability
to
pump/produce/treat
more
 groundwater
and
reduce
dependence
upon
imported
water
supply.

Project
also
replaces
current
use
of
 chlorine
gas
 This
project
will
upgrade
the
irriga3on
systems
at
various
City
Parks.

Most
have
exceeded
their
life
expectancy.

 The
average
age
of
the
irriga3on
systems
at
the
park
sites
is
25
years;
many
are
over
30
years
old
resul3ng
in
 frequent
main
breaks
and
l Solar
Contractural
Assessment
Program
(California
Assembly
Bill
811)

Irvine Irvine

CA CA

Energy Streets/Roads

Convert
I‐Shufle
buses
to
natural
gas
or
hydrogen Red
Hill
Rehabilita3on

Irvine

CA

Streets/Roads

Laguna
Canyon/HWY
405
Widening

La
Mesa La
Mesa La
Mesa La
Mesa Lakewood Lakewood

CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG CDBG

El
Cajon
Blvd.
&
La
Mesa
Blvd.
Intersec3on
Improvements Spring
Street
Trolley
Intersec3on
Improvements 2008
Street
Improvements Bal3more
Drive
Improvements Fire
alarm
system
upgrade
and
new
installa3on
on
city
buildings
(Palms) Security
camera
installa3on
on
city
buildings
(Burns,
Palms)

Lakewood Lakewood Lakewood

CA CA CA

CDBG CDBG CDBG

Roof
replacement
‐
Burns
Center Parking
lot
replacement
‐
Burns
Center
(45,000
sf) Overlay
Streets,
Area
44,
and
repair
hardscape

Lakewood Lakewood Lakewood Lakewood Lakewood Lakewood

CA CA CA CA CA CA

CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Overlay
Streets,
Area
48,
and
repair
hardscape Solar
panel
installa3on
on
five
city
buildings Overlay
West
Service
Road,
Lakewood
Blvd
between
Candlewood
St
and
Del
Amo
blvd Landscape
median
improvements
on
Del
Amo
Blvd.
between
Allred
St.
and
Hayter
Ave. Overlay
Residen3al
Streets,
Area
21,
and
repair
hardscape Overlay
Residen3al
Streets,
Area
22,
and
repair
hardscape

Lakewood Lakewood Lakewood

CA CA CA

Streets/Roads Streets/Roads Water

Lakewood Livermore Livermore

CA CA CA

Water Airport Airport

Overlay
Residen3al
Streets,
Area
42,
and
repair
hardscape Overlay
Residen3al
Streets,
Area
45,
and
repair
hardscape Sewer
containment
and
capacity
upgrade
‐
sewer
mains
that
were
iden3fied
as
deficient
in
the
City's
Sewer
 Master
Plan
will
be
replaced
or
augmented
with
larger
pipes Installa3on
of
a
Treatment
Plant
for
the
removal
of
manganese
and
hydrogen
sulfide
from
Drinking
Water
Well
 Replacement
of
fire
equipment
to
meet
current
standards Airport
terminal
upgrades
for
energy
efficiency,
ADA
accessibility
and
public
safety

Livermore

CA

CDBG

Downtown
Redevelopment
Incen3ve
Program
(Reloca3on
assistance,
Marke3ng,
Façade
Imp.)

Funding
Required Jobs 








10,000,000
 150










25,000,000


15














750,000
 








65,000,000
 












275,000
 










1,000,000
 












661,000
 










1,500,000
 










1,000,000
 










1,080,000
 










1,000,000
 










3,000,000
 












430,000
 










5,000,000
 












672,000
 










3,000,000
 










1,000,000
 










1,200,000
 












255,000
 












430,000
 












400,000
 












750,000
 












430,000
 












400,000


25 866 6 8 15 30 40 120 120 150 5 100














918,000


14












5,800,000
 










7,600,000
 










2,500,000


30 40 50












3,750,000


60












7,440,000


60














120,000


4












1,500,000


40












2,300,000


40












5,000,000


50














500,000
 










2,000,000


3 4












4,000,000


30












9,500,000
 












300,000
 












200,000
 












750,000
 










2,250,000
 














50,000


75 5 5 7 10 10
















75,000
 












109,200
 












135,000


10 15 20














500,000
 












300,000
 










3,437,500
 












200,000
 












550,000
 










1,300,000


25 25 25 15 20 25












1,500,000
 












700,000
 












370,000


25 25 25












1,700,000
 










2,200,000
 












750,000


15 30 3












4,000,000
 












275,000


17 2

3 4 4 5 6 8

City

State

Program

Livermore Livermore Livermore Livermore Livermore

CA CA CA CA CA

CDBG CDBG CDBG CDBG Energy

Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore Livermore

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Energy Energy Energy Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Renovate
old
church
for
homeless
drop‐in
center
(first
center
in
area) Renovate
historic
farm
for
use
by
Hoofprint’s
on
the
Heart,
an
adap3ve
riding
facility
for
disabled
adults
and
 Renovate
closed
school
for
Friendship
Center,
Adult
Day
Care
Facility
for
seniors
with
Alzheimer’s
and
 Redevelopment
Area
Infrastructure
Enhancements
(electrical
service
upgrades,
storm,
sewer,
and
parking) Implement
energy
efficiency
retrofit
in
City’s
Mul3‐Service
Center
(Ten
tenants
provide
services
to
over
10,000
 low
income
residents
per
year) Citywide
landscape
improvements
to
improve
water
conserva3on
and
solar
heat
island
abatement Alterna3ve
energy
efficiency
grants
for
business
and
workforce
housing Convert
exis3ng
street
lights
and
Internally
Illuminated
Street
Name
Signs
to
LED
for
energy
savings Leahy
Square
Housing
Moderniza3on
Program,

including
water
conserva3on
and
energy
efficiency Construct
Council
Chambers/Emergency
Opera3ons
Center Construct
Fire
Sta3on
No.
9 Downtown
Redevelopment
Area
Officers School
Police
Office
Program East
Bay
Regional
Communica3on
System
–
Inter
Operable
Radio
System Public
Safety
Surveillance
Equipment
(Parking
garages,
City
facili3es
and
grounds,
and
public
high
crime
areas) Annual
2009
Slurry
Sealing
of
various
City
Streets Regional
Trails
System
Upgrades
–
Increase
non‐auto
oriented
travel Reconstruct
Lizzie
Fountain
and
rehabilitate
site
improvements
and
furnishings
in
the
fountain
plaza Replace
sidewalks
City‐wide
to
meet
ADA
compliance Annual
2009
Street
Resurfacing
of
various
City
Streets Construct
new
Vasco
Rd.
ACE
Train
Parking
Lots
Connector
Road Pavement
rehabilita3on
of
Portola
Avenue
from
N.
Livermore
Ave.
to
Edinburgh
Dr.

Project
Descrip3on

Funding
Required 












150,000
 










1,600,000
 










1,000,000
 










7,000,000


Jobs

Livermore

CA

Streets/Roads

Pavement
rehabilita3on
of
various
federal‐aid
arterial
streets
in
City
of
Livermore

Livermore

CA

Streets/Roads

Construct
new
auxiliary
lanes
on
WB
I‐580
at
Vasco
Rd.,
First
St.,
and
Fallon
Rd.
Interchanges












2,500,000


11

Livermore

CA

Streets/Roads

Construct
new
Caltrans
Park
&
Ride
Parking
Lot
along
Kify
Hawk
Rd.














500,000


12

Livermore

CA

Streets/Roads

Realign
East
Vineyard
to
remove
curves
and
provide
signaliza3on
at
Vallecitos
Road












2,000,000


12

Livermore

CA

Streets/Roads

Pavement
rehabilita3on
for
First
St.,
Holmes
St.
and
Vallecitos
Rd.
along
former
State
Route
84












3,100,000


15

Livermore

CA

Streets/Roads

Build
Iron
Horse
Trail
in
Downtown
Redevelopment
Area
and
near
transit
center












5,000,000


22

Livermore

CA

Streets/Roads

Extend
W.
Jack
London
Boulevard
from
west
of
SR
84
to
El
Charro
Road.I‐580












9,700,000


40

Livermore

CA

Transit

Access‐to‐transit
improvements,
incl.
sidewalk
gap
closures,
ADA
compliance
upgrades
and
new
shelters
at
 exis3ng
bus
stops
in
City
of
Livermore














500,000


2

Livermore

CA

Water

Construct
new
Water
Reclama3on
Plant
Laboratory,
Office
and
Shop
Building

Livermore

CA

Water

El
Charro
Regional
flood
control
improvements

Livermore

CA

Water

El
Charro
Specific
Plan
Potable
Water
System

Livermore

CA

Water

El
Charro
Specific
Plan
Recycled
Water
System

Livermore

CA

Water

El
Charro
Specific
Plan
Sewer
Pump
Sta3on/Force
Main
and
sewer
infrastructure












1,800,000


Livermore

CA

Water












2,200,000


Livermore

CA

Water

Re‐line
and
replace
a
sec3on
of
industrial
sewer
trunkline
between
Union
Pacific
Railroad
track
between
North
 Mines
Rd.
and
Junc3on
Ave. Relocate
and
construct
new
Springtown
Pump
Sta3on

Livermore

CA

Water

Replace
sanitary
sewer
lines
at
various
loca3ons
city‐wide












1,500,000


Livermore

CA

Water

Replace
various
sewer
mainline
boflenecks
city‐wide












2,600,000


Livermore

CA

Water

Alterna3ve
energy
produc3on
facility
for
WWTP

Livermore

CA

Water

Water
transmission
(incl.
recycled
water)
and
sanitary
sewer
improvements












1,100,000


6

Livermore

CA

Water

Expanded
recycled
water
program












5,000,000


21

Livermore

CA

Water

Water
Reclama3on
Plant
Process
Improvements












8,000,000


35

Lodi

CA

Streets/Roads

Lodi
Avenue
Reconstruc3on
and
Smart
Growth
Incen3ves
Project












1,000,000


10

Lodi

CA

Streets/Roads

Miscellaneous
Streets
Overlay
Projects












1,000,000


10

Lodi

CA

Streets/Roads

Lockeford
Street
Widening
Project












1,700,000


15

Lodi

CA

Streets/Roads

Harney
Lane
Widening
Project 










2,500,000


20

Lodi

CA

Transit

Transit
Maintenance
Shop
Solar
Power
Project

Lodi

CA

Water

Lodi

CA

Lodi

CA

Lodi Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

3 7 12 29














200,000
 










1,000,000
 










1,500,000
 








12,290,000
 










3,125,000
 








12,300,000
 










5,000,000
 












250,000
 












250,000
 










1,500,000
 










1,500,000
 










2,000,000
 










1,500,000
 












500,000
 










1,500,000
 










2,500,000
 












800,000


2 4 7 52 50














700,000


10












2,400,000


10

2 2 7 7 6 7 8 8 10 10












6,500,000











12,000,000













1,400,000
 












715,000













2,250,000















750,000


3














800,000


6

Wastewater
Pipe
Lining
Project












2,000,000


10

Water

Water
Main
Replacement
Project












2,000,000


20

Water

Groundwater
Resource
Preserva3on
Project

Water Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy

Lodi
Lake
Surface
Water
Treatment
Plant
and
Transmission
Project Long
Beach
Airport
Solar
Powered
Parking
Structure
Project—Includes
a
new
3,200
space
parking
structure,
 Non
Profit
Assistance—Provide
zero
percent
interest
loans
ranging
from
$5,000
to
$70,000
for
facility
 Business
Districts
Signage
Program—S3mulus
funding
will
be
used
to
develop
and
implement
a
comprehensive
 Energy
Efficient
Homes—Implement
an
Energy
Efficient
Homes
program,
using
the
current
CDBG‐funded
Home
 Neighborhood
Sidewalk
Replacement
&
Improvement
Project—Funds
will
be
used
to
aggressively
expand
this
 Summer
Sidewalk
Improvement
Project—This
program
would
provide
area
youth
with
the
opportunity
to
 Extensive
Façade
Improvement
Project—Area
architects
and
contractors
would
be
selected
via
the
Request
for
 Park
and
Open
Space
Improvement
Project—CDBG
currently
funds
a
$25
million
bond
for
park
and
open
space
 Mural
Projects
on
Local
Public
&
Private
Facili3es—The
Economic
Development
Bureau,
in
conjunc3on
with
 Incen3ves/Grants
for
Solar
Installa3ons—Incen3ves/grants
to
developers
and
residents
to
incorporate
solar
 Tree
Plan3ng—The
City
will
implement
a
tree
plan3ng
program
that
will
decrease
the
urban
heat
island
effect
 LED
Street
Ligh3ng
Enhancement
Program—Convert
standard
street
lights
in
residen3al
and
commercial
areas
 Alterna3ve
Fuels—Invest
in
and
promote
the
use
of
alterna3ve
fuels
among
residents
and
businesses,
and
 Energy
Retrofits
for
Municipal
Buildings—Increase
energy
efficiency
and
reduce
costs
to
the
City
by
retrofiqng













2,500,000
 










3,000,000
 








85,000,000
 












700,000
 










1,500,000
 










1,500,000
 










1,000,000
 












200,000
 










1,500,000
 










6,000,000
 










3,000,000
 










2,000,000
 








19,000,000
 










3,000,000
 








40,000,000
 








90,000,000


25 40 1000 20 35 43 50 50 86 172 175 13 28 50 56 105

City

State

Program

Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Long
Beach Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Airport Airport Airport Airport Airport Airport Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Housing Housing Housing Housing Housing Housing

Project
Descrip3on Funding
Required 












779,000
 Forensic
Inves3ga3on
Equipment—Acquire
the
necessary
equipment
for
controlled
substance,
firearms,
 










1,000,000
 Front
Line
Law
Enforcement
Over3me—Addi3onal
funding
would
allow
the
Long
Beach
Police
Department
to
 










1,500,000
 Mobile
Radio
Equipment—Addi3onal
funding
would
allow
the
LBPD
to
procure
and
install
330
new
mobile
 










1,000,000
 Studebaker
and
7th
Street
Improvement
Project—Implement
significant
landscaping
improvements
and
traffic
 










5,000,000
 Long
Beach
Bicycle
Boulevard
Connec3ons—Construct
4
bicycle
boulevards
to
begin
a
citywide
network
that
 








30,537,559
 Citywide
Street
Resurfacing
&
Rehabilita3on
Project—Resurfacing
and
rehabilita3ng
approximately
24
streets
 










6,660,000
 Cast
Iron
Water
Main
Replacement—This
project
would
replace
old
cast
iron
water
mains
that
have
reached
 










1,950,000
 Recycled
Water
Facility
Improvements—This
project
would
expand
the
Long
Beach
Water
Department’s
 










2,392,000
 Sewer
System
Improvements—This
project
would
undertake
major
sewer
system
rehabilita3on
at
the
 








50,000,000
 Water
Conserva3on
in
Public
Landscapes—Implement
irriga3on
infrastructure
upgrades
citywide
with
water
 










1,600,000
 Water
Distribu3on
System
Improvements—This
project
involves
undertaking
needed
repairs
and
maintenance
 










3,515,000
 Water
Resources
Facility
Improvements—Replace
the
gaseous
Chlorine
storage
facility
and
related
transport
 












500,000
 Installa3on
of
Treatment
Devices
for
5
Ouzalls—Install
end‐of‐pipe
structural
best
management
devices
at
5
of
 






111,400,000
 Storm
Drain
Replacement
Program—The
Long
Beach
Public
Works
Department
will
replace
28.1
miles
of
 










8,000,000
 Catch
Basin
Best
Management
Prac3ces
Program—Install
a
debris
excluder
at
the
mouth
of
inlets
with
a
filter
 








17,250,000
 Upgrading
23
City‐Owned
Pump
Sta3ons—Upgrade
the
23
city‐owned
pump
sta3ons
with
low‐flow
diversion
 








10,000,000
 LAX
Airport
Opera3ons
Center
(AOC)
and
Department
Opera3ons
Center
(DOC) 








17,500,000
 Passenger
Boarding
Bridges 








56,250,000
 Perimeter
Security
Fence 






112,500,000
 North
Airfield
Improvements 






125,000,000
 Ver3cal
Conveyance 






187,500,000
 Crossfield
Taxiway 






150,000,000
 Exis3ng
Terminal
Improvements 










1,000,000
 Business
District
Pedestrian
and
Median
Improvements 










1,000,000
 Lemon
Grove
Ligh3ng
Improvements
‐
New
Streetlights 












900,000
 West
Adams
Ligh3ng
Improvements
1B‐New
Streetlights 










1,350,000
 Santa
Monica
and
Heliotrope
Ligh3ng
Improvements
‐

New
streetlights 












730,000
 Maya
Townhomes 












918,000
 My
Townhomes 












719,000
 Mediterranean
Apts. 










1,336,000
 PH&D
Apts. 










1,539,000
 Swansea
Senior 












390,000
 Hollywood
Bungalow
Courts 










2,069,000
 Bonnie
Brae
Apt.
Homes 










3,677,000
 Menlo
Park 










1,953,000
 Three
Courtyards 








12,500,000
 Berth
145‐147
Wharf
Reconstruc3on 










2,449,000
 Renato 








13,500,000
 Broadway
Pedestrian
Improvements 










2,371,000
 Andalucia
Senior 










1,115,000
 Bonnie
Brae
Village 










1,885,000
 New
Genesis 










3,880,000
 Miramar
Village 










9,500,000
 MacArthur
Park
Metro
A
&
B 








17,000,000
 Taylor
Yard
Transit
Village 












300,000
 South
Hall
Cooling
Tower
Replacement 












700,000
 Colortran
Dimming
System 












800,000
 LA
River
Bikeway
Solar/LED
Retrofit 












779,240
 Westchester‐Playa
del
Rey
Street
Ligh3ng
Energy
Retrofit 










1,250,000
 Energy
Efficiency/Green
Programs 












877,800
 Sherman
Oaks‐Studio
City‐Toluca
Lake
Street
Ligh3ng
Energy
Retrofit 












904,750
 Studio
City
Street
Ligh3ng
Energy
Retrofit 












842,850
 West
Los
Angeles
Unit
III
Street
Ligh3ng
Energy
Retrofit 










1,129,800
 Canoga
Park
West
Unit
II
Street
Ligh3ng
Energy
Retrofit 










1,500,000
 Chiller
Replacement 












850,000
 Main
Channel
Deepening/Dredging 










1,609,300
 Los
Feliz‐Hollywood
Street
Ligh3ng
Energy
Retrofit 










1,566,600
 Reseda‐West
Van
Nuys
Street
Ligh3ng
Energy
Retrofit 










1,651,650
 Greater
Wilshire
Street
Ligh3ng
Energy
Retrofit 










1,705,200
 Palms‐Del
Rey‐Mar
Vista
Unit
II
Street
Ligh3ng
Energy
Retrofit 










1,848,000
 Palms‐Del
Rey‐Mar
Vista
Street
Ligh3ng
Energy
Retrofit 










2,100,000
 Brentwood
Street
Ligh3ng
Energy
Retrofit 










4,500,000
 North
Central
LNG
Facility 










4,000,000
 Low
Income
Refrigerator
Exchange
(LIREP):
 










4,000,000
 Small
Business
Direct
Install
(SBDI):
 










6,000,000
 LED
Ligh3ng
Retrofits
‐
Retrofit
of
exis3ng
lights
 








10,000,000
 Harbor
Clean
Fuel
Facility 








55,000,000
 City
Irriga3on
Retro‐fit
Program
(500
acres) 






196,666,667
 Energy
conserva3on
(demand
management) 






213,333,333
 Renewable
Energy 






500,000,000
 Port
of
LA
Green
Jobs/CAAP
(CTP,
AMP,
Clean
Tech) 




2,160,000,000
 Solar
LA
Program 














92,949
 Soil
remedia3on
and
lead
abatement 












179,000
 Trailer
demoli3on 












440,000
 Mildew
abatement 












652,000
 Repair
fire
damage
units 










1,500,000
 Jordan
Downs
Remedia3on 










2,500,000
 Security
bars
and
doors

Jobs

13 63 382

29 38 101 174 58 204 433 869 1445 1446 1726 6 6 6 9 52 52 56 85 112 118 137 138 139 145 145 166 178 190 196 229 428 1046 2 4 6 6 7 7 7 7 9 9 9 13 13 14 14 15 17 52 58 58 59 115 347 1427 1620 12993 31243 0.538 1.036 2.546 3.772 8.679 14.46

City

State

Program

Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing PublicSafety Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Project
Descrip3on Repair
water
damaged
units Playground
repair
and
upgrade Landscaping
 Concrete
and
paving
work Reroofing
of
public
housing
buildings U3li3es
upgrades
and
energy
conserva3on 504/VCA
Reasonable
Accommoda3on
 Asbestos
abatement
and
floor
replacement Carpentry
work
throughout
the
developments Security
cameras
and
lights Pain3ng
of
public
housing
sites Red
Line
7th/Metro
Sta3on
Capacity
and
Safety
Improvements RWGPL
‐
West
Parking
Lot Astronomy
Building Campus‐Wide
Infrastructure
‐
Smart
Classrooms
(SCR) Temporary
Facili3es
‐
Food
Services WALL
SYSTEMS_BURROUGHS
MS SHEET
METAL
/
FENCING_LOS
ANGELES
SH Temporary
Facili3es
‐
Temporary
Trailer
for
Overflow Learning
Resource
Center
‐
Space
Hea3ng
System Math
and
Science
Building
‐
Space
Hea3ng
System FHWA‐Brahma
Drive Campus
Improvements
‐
Central
Quad
Improvements College
Kiosks
Renova3on San
Fernando
Road
Street
Widening HVAC_BRIGHT
EL Liberal
Arts
‐
Replace
Theater
Pneuma3c
Controls HVAC_BELMONT
SH Science
Building RWGPL
‐
Campus
Fire
Access
Plan
‐
I HVAC_MARK
TWAIN
MS DSA
ACCESS
COMPLIANCE_BERENDO
MS DSA
ACCESS
COMPLIANCE_LANTERMAN
HS FLOOR
COVERINGS_PACOIMA
EEC DSA
ACCESS
COMPLIANCE_KENTER
CANYON
EL MODERNIZATIONS_75TH
STREET
EEC Heat
Genera3ng
Syst_VAN
NUYS
EL LUNCH
SHELTERS_28TH
STREET
EEC LUNCH
SHELTERS_MARINA
EEC LUNCH
SHELTERS_MIKES
EEC MODERNIZATIONS_HADDON
EEC INSTALL
PLYGRND
EQ.
&
MAT_BALDWIN
HILLS
EL PLUMBING
/
IRRIGATION_LAUREL
EEC ROOFING_VAN
NUYS
SH RWGPL
‐
Landscaping
Central
Walk
and
North
Quad Campus
Improvements
‐
Execu3ve
Corridor
Improvements MODERNIZATIONS_TRINITY
EEC DSA
ACCESS
COMPLIANCE_SAN
PEDRO
SH MODERNIZATIONS_EL
SERENO
EEC Site
development_LOS
ANGELES
EL paint
exterior_LOS
FELIZ
EL Floor
Coverings_MCBRIDE
SP
ED
CTR EXTERIOR
WALLS_WESTERN
EL ROOFING_VENICE
SH PLUMBING
/
IRRIGATION_WASHINGTON
EEC LUNCH
SHELTERS_HADDON
EEC ROOFING_WADSWORTH
EL INTERIOR
PAINT_VINE
EEC Pave
Faculty
Parking
Lot_COWAN
EL
(i) WALL
SYSTEMS_GATES
EEC INSTALL
PLYGRND
EQ.
&
MAT_6TH
AVE
EL WALL
SYSTEMS_STERRY
EEC DSA
ACCESS
COMPLIANCE_DANA
MS ROOFING_LAWRENCE
MS RWGPL
‐
Extended
Campus
Improvements Seismic
Tilt‐ups_GARDENA
SH Emergency
Ligh3ng,
Fire
Alarm,
and
Security
Systems PLUMBING
/
IRRIGATION_GRANT
EEC REPLACE
BOILER
&
CEILING
_PASEO
DEL
REY
NAT
SC HVAC_WEST
VERNON
EL MODERNIZATIONS_GLUCK
(MAXWELL)
EEC Domes3c
Water
Distr_REVERE
MS PLUMBING
/
IRRIGATION_HYDE
PARK
EL Floor
Coverings_NARBONNE
SH HVAC_FAIRFAX
SH Monroe
Street
Plaza MODERNIZATIONS_VAUGHN
EEC Wall
Coverings_POMELO
EL

Funding
Required 










2,646,200
 










5,000,000
 










8,100,000
 










9,135,304
 










9,616,000
 








14,166,000
 








18,851,077
 








26,500,000
 








30,084,500
 








35,000,000
 








36,240,000
 










2,000,000
 















7,830
 














11,889
 














28,160
 














50,556
 














60,918
 














68,198
 












128,065
 












149,200
 












208,605
 












240,000
 












249,133
 












264,000
 












320,000
 












212,856
 












347,139
 












237,094
 












400,325
 












452,800
 












286,582
 












289,960
 












288,528
 












289,600
 












292,972
 












296,100
 












302,424
 












300,000
 












300,000
 












300,000
 












300,000
 












302,798
 












316,600
 












317,000
 












515,461
 












520,000
 












326,200
 












340,972
 












346,200
 












349,603
 












353,819
 












359,952
 












376,508
 












376,445
 












379,400
 












383,100
 












382,665
 












394,000
 












396,837
 












397,200
 












399,967
 












398,400
 












404,100
 












416,918
 












667,324
 












430,387
 












692,670
 












432,700
 












441,658
 












454,138
 












456,400
 












460,578
 












460,303
 












470,497
 












474,669
 












768,000
 












486,900
 












483,380


Jobs 15.31 28.93 46.86 52.85 55.64 81.96 109.1 153.3 174.1 202.5 209.7 12 0.056 0.086 0.203 0.364 0.694 0.81 0.922 1.075 1.502 1.729 1.794 1.901 2.305 2.488 2.5 2.719 2.883 3.261 3.298 3.356 3.356 3.356 3.414 3.414 3.471 3.471 3.471 3.471 3.471 3.529 3.645 3.645 3.713 3.745 3.761 3.934 3.992 4.05 4.108 4.166 4.339 4.339 4.397 4.455 4.455 4.571 4.571 4.571 4.629 4.629 4.686 4.802 4.806 4.976 4.989 5.034 5.091 5.265 5.265 5.323 5.323 5.439 5.496 5.531 5.612 5.612

City

State

Program

Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Project
Descrip3on ROOFING_MACLAY
MS FOOD
SERVICES
MODERNIZATION_68TH
ST
EL ROOFING_MADISON
MS Concrete
Repairs_MARINA
DEL
REY
MS ROOFING_SEPULVEDA
MS ELE.
DISTRUBUTION
SYSTMS_EAGLE
ROCK
HS DSA
ACCESS
COMPLIANCE_BRAINARD
EL Terminal
&
Package
U_FLETCHER
DR
EL PLUMBING
/
IRRIGATION_RAYMOND
AVE
EL DSA
ACCESS
COMPLIANCE_DORSEY
SH ROOFING_NO
HOLLYWOOD
SH Campus
Administra3ve
Services
Building
Remodel AIR
CONDITIONING_PALISADES
CHRTR
SH Seismic
Tilt‐ups_GARDENA
SH ROOFING_MONROE
SH Seismic
Tilt‐ups_GARDENA
SH YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_MILLER
EL Campus‐Wide
Improvements
‐
Emergency
Ligh3ng,
Fire
Alarm
and
Security
System Domes3c
Water
Distr_MARSHALL
SH ROOFING_SYLMAR
SH ROOFING_NAPA
EL Wall
Coverings_UTAH
EL ROOFING_MONTE
VISTA
EL ROOFING_COWAN
EL
(i) Domes3c
Water
Distr_CANOGA
PARK
SH ROOFING_MILLIKAN
MS HVAC_HARTE
PREP
MS FENCING
REPAIRS_MANN
MS Replace
Cooling
Tower_BANNING
SH YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_FREMONT
SH YEAR‐ROUND
AIR
CONDITIONING
GYM_FREMONT
SH Phase
I
Renova3ons
‐
Faculty
Office Athle3c
Field
Reloca3on Life
Sciences
Building Seismic
Tilt‐ups_GARDENA
SH YEAR‐ROUND
AIR
CONDITIONING
AUDITORIUM_MANCHESTER
EL HVAC_BIRMINGHAM
SH ROOFING_LIGGETT
EL Phase
I
Renova3ons
‐
Business
Educa3on ROOFING_VENICE
SH HVAC_ARLINGTON
HTS
EL Seismic
Tilt‐ups_GARDENA
SH AUDITORIUM
RENOVATIONS_FOSHAY
LC Seismic
Tilt‐ups_VIRGIL
MS PLUMBING
/
IRRIGATION_MOUNTAIN
VIEW
EL FTA
Bus
Rapid
Transit
Extension
&
Winnetka
/
Mason
DeSoto
Entrances MODERNIZATIONS_LOGAN
EEC MODERNIZATIONS_MARVIN
EL ROOFING_VAN
NUYS
SH RWGPL‐
MTA
Bus
Sta3on
Extension ELECTRICAL
/
M&O
FIRE
ALARM_TAFT
SH Seismic
Tilt‐ups_GARDENA
SH FOOD
SERVICES
MODERNIZATION_NORWOOD
EL Fashion
and
Fine
Arts
Building
‐
HVAC
Upgrade Seismic
Tilt‐ups_IRVING
MS Seismic
Tilt‐ups_JEFFERSON
SH PAVING
/
GREENING
/
EQUIPMENT_FULLBRIGHT
EL Phase
I
Renova3ons
‐
Fine
Arts
and
Music PAVING
/
GREENING
/
EQUIPMENT_SERRANIA
EL ROOFING_MACLAY
MS Seismic
Tilt‐ups_GARDENA
SH Seismic
Tilt‐ups_MANHATTAN
EL PLUMBING
/
IRRIGATION_MONROE
SH ROOFING_NO
HOLLYWOOD
SH HVAC_GRANADA
HILLS
HS RWGPL
‐
Traffic
Mi3ga3on AIR
CONDITIONING_HOOVER
EL Seismic
Tilt‐ups_EL
CAMINO
REAL
SH Jefferson
Hall (6)
Valley
Region
Byrd
HS
Reconfigura3on
‐
Athle3c
Field
Upgrade HVAC_SUN
VALLEY
MS AIR
CONDITIONING_VENICE
SH NEW
BUILDING
"EXISTING
FACILITIES"_BURBANK
MS NEW
BUILDING
"EXISTING
FACILITIES"_UNIVERSITY
SH FOOD
SERVICES
MODERNIZATION_MULTNOMAH
EL Landscape
and
Site
Master
Plan Community
Services
Center Library,
Administra3on
and
Campus
Quad

Funding
Required 












491,693
 












500,000
 












500,000
 












542,473
 












538,773
 












543,997
 












550,453
 












561,014
 












576,023
 












583,746
 












607,741
 










1,004,586
 












638,000
 












643,201
 












675,032
 












686,114
 












709,800
 










1,165,933
 












753,645
 












764,060
 












797,342
 












795,816
 












813,824
 












829,484
 












836,940
 












859,787
 












881,190
 












932,379
 












931,456
 










1,000,000
 










1,000,000
 










1,641,818
 










1,685,268
 










1,716,994
 










1,108,179
 










1,111,000
 










1,186,000
 










1,223,862
 










1,981,171
 










1,247,259
 










1,305,594
 










1,331,230
 










1,355,510
 










1,356,101
 










1,416,936
 










2,313,717
 










1,512,600
 










1,592,201
 










1,588,144
 










2,585,488
 










1,614,114
 










1,662,268
 










1,700,000
 










2,794,438
 










1,812,624
 










2,196,386
 










2,249,541
 










3,813,416
 










2,452,509
 










2,463,342
 










2,525,621
 










2,574,123
 










2,875,227
 










3,018,552
 










3,069,710
 










5,120,400
 










3,479,589
 










4,313,628
 










7,188,082
 










5,500,000
 










5,774,646
 










6,000,000
 










6,000,000
 










6,000,000
 










6,700,000
 








11,577,358
 








12,121,212
 








12,759,171


Jobs 5.67 5.786 5.786 6.249 6.249 6.306 6.364 6.48 6.654 6.769 7.059 7.235 7.406 7.464 7.811 7.926 8.216 8.397 8.736 8.852 9.199 9.199 9.431 9.604 9.662 9.951 10.18 10.76 10.76 11.57 11.57 11.82 12.14 12.37 12.84 12.84 13.71 14.18 14.27 14.41 15.1 15.39 15.68 15.68 16.37 16.66 17.53 18.4 18.4 18.62 18.69 19.21 19.67 20.13 21 25.4 26.04 27.47 28.41 28.52 29.22 29.8 33.27 34.95 35.52 36.88 40.27 49.93 51.77 63.64 66.83 69.43 69.43 69.43 77.53 83.38 87.3 91.9

City

State

Program

Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

(8)
Aldama
ES
‐
Addi3on
‐
CSR Facili3es
Maintenance Student
Service
Center Maintenance
and
Opera3ons Parking
Structures Business
and
Technology Parking
Structures Library
and
Learning
Resource
Center (3)
Central
LA
HS
#12
* (5)
East
Valley
Area
New
HS
#1B
Addi3on
* (1)
Valley
Region
Monroe
Span
K‐8
Addi3on
* (4)
Valley
Region
MS
#3
* Library
Learning
Center East
Campus
Complex Balboa
Blvd
Traffic
Signal
at
Knollwood
Shopping
Center
Driveway El
Dorado
and
Bromwich
Pedestrian
Improvements La
Brea
Pedestrian
Improvements LAUSD
Valley
Region
HS
#4
Pedestrian
Improvements Santa
Monica
and
Western
Pedestrian
Improvements Terra
Bella
Street
Widening Angel's
Knoll
Pedestrian
Improvements Barnsdall
TOD
Pedestrian
Improvements Commerce
Avenue
Pedestrian
Improvements Balboa
Road
and
San
Fernando
Road
Intersec3on
Improvement Coldwater
Canyon
Av
at
Raymer
St East
Hollywood
Pedestrian
Improvements Pacific
Avenue
Pedestrian
Improvements Sharpe
Avenue
(Garber
to
Kamloops)
Drainage
Pedestrian
Improvements Canoga
Park
Pedestrian
Improvements
(Phase
III) Pico
Boulevard
Pedestrian
Improvements New
Leb
Turn
Improvements Sun
Valley
Median
Improvements CD
7
Scafered
Pedestrian
Improvements NoHo
Pedestrian
Improvements Sylmar
Pedestrian
Improvements Alvarado
Pedestrian
Improvements Olympic
Blvd
Widening
/
Alameda
to
McGarry
St Sepulveda
Blvd
at
Burbank
Blvd
Intersec3on
Improvements Jordan
Downs
Century
Blvd.
Extension New
Traffic
Signals Chinatown
Pedestrian
Improvements City
of
Los
Angeles
Bay
Harbor
Region
Resurfacing
Projects City
of
Los
Angeles
East
Valley
Region
Resurfacing
Projects City
of
Los
Angeles
North
Central
Region
Resurfacing
Projects City
of
Los
Angeles
West
Valley
Region
Resurfacing
Projects LAX
Hospitality
Enhancement
Zone
Projects Highway‐Rail
Grade
Crossing
Improvement
Program
(HRGCIP) Overland
Ave
Bridge
Widening
Over
I‐10
Freeway

Project
Descrip3on

Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles Los
Angeles

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit

Signal
LED
Retrofit
Program Widening
of
2
US‐101
Off‐Ramps Advanced
Transporta3on
Management
Informa3on
and
Security
Systems Sepulveda
Blvd.
Reversible
Lane,
Bike
Lane
and
Intersec3on
Improvements
Project
 Citywide
Paving
of
Un‐Paved
Roads Goodyear
Tract
Infrastructure
Improvements Harry
Bridges
Blvd.
Improvements 60
Freeway
Repavement
Project Wilshire
Boulevard
Repavement
Project I‐HOV
Soundwall
SR‐118
‐
SR
14 I‐405
Car
Pool
Lane
Enhancements 210
Freeway
Repavement
Project I‐5
HOV
from
SR‐170
to
SR‐118 Major
Street
Repair
and
Resurfacing N.
Parking
Lot
at
Chatsworth
Metrolink
Sta3on 410
Center
Street
Improvements Roof
Replacement Cypress
Park
Bus
Division
Facility
Improvements
(Phase
IV) Cypress
Park
Bus
Division
Facility
Improvements
(Phase
II) Cypress
Park
Bus
Division
Facility
Improvements
(Phase
III) Lankershim
Transit
Center Harbor
Transitway
Sta3on
Improvements Bauchet
Street
Storage
&
Facili3es
Maintenance
Structure Commuter
Express
Bus
Replacement
(CNG) Metro
Redline
Yard
(Division
20)
Carwash
&
Cleaning Electrify
Compression
of
Natural
Gas
at
Combus3on
Engines
at
CNG
Fueling
Sta3ons Bus
Replacement
Project
(Contract
Services
Buses) Universal
City
Sta3on
parking/Bus
Layover
facility Metro
Blue
Line
Trac3on
Power
Substa3on Bus
Replacement
Project
(Metro
Buses)

Funding
Required 








10,506,804
 








17,862,839
 








21,494,318
 








25,518,341
 








25,518,341
 








38,277,512
 








40,829,346
 








44,610,394
 








30,325,536
 








30,451,178
 








30,906,467
 








37,641,457
 








62,519,936
 








72,727,273
 












130,000
 












550,000
 












500,000
 












300,000
 












396,000
 












400,000
 












290,000
 












284,000
 












900,000
 












500,000
 












300,000
 










1,000,000
 










1,040,000
 










1,250,000
 










1,566,000
 










1,800,000
 










2,000,000
 










2,000,000
 










2,300,000
 












940,000
 










2,300,000
 










1,250,000
 










2,600,000
 












450,000
 










3,500,000
 










3,500,000
 










1,000,000
 










5,000,000
 










5,000,000
 










5,000,000
 










5,000,000
 










7,000,000
 










2,368,000


Jobs 121.6 128.7 154.8 183.8 183.8 275.7 294.1 321.3 350.9 352.4 357.6 435.5 450.3 523.8 1 3 3 3 3 3 4 4 5 6 6 6 6 7 9 10 12 12 13 13 13 15 15 18 20 20 26 29 29 29 29 41 50












2,000,000
 










9,000,000
 








11,000,000
 










2,000,000
 










4,000,000
 








20,000,000
 








29,961,000
 








25,597,000
 








46,000,000
 








60,000,000
 








39,000,000
 






100,000,000
 






112,000,000
 








55,000,000
 






500,000,000
 










1,500,000
 










1,878,150
 










2,189,079
 










3,000,000
 










4,650,000
 










5,500,000
 










6,000,000
 








11,000,000
 








13,000,000
 








10,500,000
 








15,400,000
 








28,000,000
 








40,000,000
 








47,000,000
 








82,000,000
 






291,000,000


50 52 64 66 83 116 173 184 266 347 528 579 648 1858 2893 8.679 10.87 12.67 17.36 26.9 31.82 34.71 63.64 75.21 75.94 89.1 162 231.4 271.9 474.4 1684

City

State

Program

Los
Angeles Los
Angeles

CA CA

Transit Water

Light
Rail
and
Heavy
Rail
Vehicle
Rebuilding
for

the
Blue
Line
and
the
Red
Line
Rail
Systems Swarthmore
Redirect

Project
Descrip3on

Los
Angeles

CA

Water

Van
Nuys
High
School
Water
Recycling
Project

Los
Angeles

CA

Water

Los
Angeles

CA

Los
Angeles

CA

Los
Angeles

Funding
Required 






350,000,000


Jobs 2025














455,000


2.625














700,000


4.05

Van
Nuys
Water
Recycling
Project












1,000,000


5.786

Water

Valley
Presbyterian
Hospital
Water
Recycling
Project












1,200,000


6.943

Water

Cypress
Park
Water
Recycling
Project












1,715,000


9.923

CA

Water

Wafs
Tower
Storm
Drain












2,100,000


12.15

Los
Angeles

CA

Water

Hansen
Dam
Water
Recycling
Project












2,548,631


14.75

Los
Angeles

CA

Water

Woodman
Avenue
Infiltra3on
Project












3,000,000


17.36

Los
Angeles

CA

Water

Taylor
Yard
Water
Recycling
Project
–
Parcel
C
Development












4,600,000


26.61

Los
Angeles

CA

Water

Tujunga
Well
Treatment












6,000,000


34.71

Los
Angeles

CA

Water

DCT
‐
Filter
Replacement
Installa3on










11,304,140
 65.17

Los
Angeles

CA

Water

Hansen
Spreading
Grounds
Enhancement
Project










12,000,000
 69.43

Los
Angeles

CA

Water

Temescal
Canyon
Park
Stormwater
Diversion
and
Treatment












7,473,718


Los
Angeles

CA

Water

Santa
Ynez
Reservoir
Floa3ng
Cover
Project
‐
Spec
7106










22,575,000
 130.6

Los
Angeles

CA

Water

4th
Ave/Slauson
Sewer
Rehab.










26,365,880
 151.8

Los
Angeles

CA

Water

North
Ouzall
Sewer

Maze
Rehab:
Phase
5










27,118,080
 156.2

Los
Angeles

CA

Water

Van
Norman
Chloramina3on
Stn
#1
&
#2










33,000,000
 190.9

Los
Angeles

CA

Water

City
Trunkline











34,000,000
 196.7

Los
Angeles

CA

Water

Central
Ouzall
Sewer
Rehab
NORS
Div
4
to
Market
St










35,111,640
 202.5

Los
Angeles

CA

Water

Santa
Monica
Bay
Low
Flow
Diversion
Upgrades
(Packages
1,
2,
3
and
4)










22,981,237


Los
Angeles

CA

Water

River
Supply
Conduit
Unit
4










38,000,000
 219.9

Los
Angeles

CA

Water

River
Supply
Conduit
Unit
3

Los
Angeles

CA

Water

Big
Tujunga
Dam
–
San
Fernando
Basin
Groundwater
Enhancement
Project










44,250,000
 611.6

Los
Angeles

CA

Water

Water
Recycling
Program








111,500,000


Manhafan
Beach

CA

CDBG

Water
Filtra3on












8,000,000


40

Manhafan
Beach

CA

CDBG

Bridge
Widening










10,000,000


100

Manhafan
Beach

CA

CDBG

Sewer
Line
replacement










30,000,000


200

Manhafan
Beach

CA

CDBG

New
Library 








35,000,000


250

Manhafan
Beach

CA

Energy

City
Solar
Conversion










15,000,000


100

Manhafan
Beach

CA

Transit

CNG
Bus
Purchases












5,000,000


50

Manhafan
Beach

CA

Water

Sewer
Line
Replacement










30,000,000


200

Merced

CA

Airport

Paving
for
Airport
Hangar
Construc3on. Merced’s
Airport
is
growing
but
faces
economic
challenges.

This
project
would
include
paving
an
area
to
move
 a
number
of
exis3ng
hangars,
and
provide
space
to
build
new
hangars.

The
new
facili3es
will
accommoda














750,000


15

Merced

CA

Airport














350,000


25

Merced

CA

Airport












1,200,000


30

Merced

CA

CDBG

Commercial
Truck
Parking
Lot
Renova3on.
 This
project
completes
a
parking
lot
at
the
Municipal
Airport
to
relieve
community‐wide
neighborhood
 problems
with
commercial
truck
parking.

The
improvements
include
demolishing
and
remove
a
dilapidated
 abandone New
Airport
Hangars The
project
adds
capacity
at
the
Municipal
Airport
to
accommodate
more
general
avia3on
aircrab.

The
 hangars
are
pre‐engineered
steel
buildings
to
save
on
cost.

Up
to
16
more
aircrab
could
be
housed,
adding
 greater
economic
vitali Applegate
Park
Expansion:

The
project
funds
development
of
an
approximately
1
acre
blighted
area
at
the
 corner
of
26th
&
"M"
Street,
to
improve
the
City’s
largest
and
most
heavily
used
park.















200,000


15

Merced

CA

CDBG

Merced Merced Merced Merced Merced Merced Merced Merced Merced

CA CA CA CA CA CA CA CA CA

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG












1,800,000
 










1,200,000
 












900,000
 










1,750,000
 












900,000
 










1,200,000
 










2,000,000
 












900,000
 












900,000


20 20 20 20 25 30 30 55 60














675,000


60

Merced

CA

Energy














300,000


30

Merced

CA

Public
Safety














115,000


10

Merced

CA

Public
Safety














250,000


10

86.09

208










55,000,000
 318.2

ADA
Ramps
&
Sidewalks The
City
has
an
annual
project
to
iden3fy
and
priori3ze
needs
for
ADA‐compliant
ramps
and
adjacent
 sidewalks.

The
addi3onal
funding
allows
accelera3on
of
improvements,
par3cularly
in
older,
low‐income
 areas,
greatly
benefi3ng Bellevue
Ranch
East
Phase
3
Improvements:


The
project
will
provide
complete
public
improvements,
 Lester
Yoshida
Neighborhood
Park:

The
project
funds
development
of
a
4‐acre
neighborhood
in
northeast
 Sidewalk
Rehabilita3on Charles
Ogletree
Neighborhood
Park:

Funding
is
needed
for
development
of
a
7‐acre
neighborhood
park
in
 Fahrens
Creek
Park,
Phase
3:
Project
enhances
habitat
and
restores
na3ve
plants
and
grasses
along
Fahrens
 Merced
Theatre
Restora3on:
The
City
and
Redevelopment
Agency
have
been
seeking
to
restore
this
signature
 Alfarata
Ranch
Neighborhood
Park Flanagan
Neighborhood
Park South
Merced
Mini‐Parks
(9) The
project
will
fund
the
removal
and
replacement
of
exis3ng
playground
equipment
for
ADA
compliance
in
 South
Merced
mini‐parks.

The
result
will
be
to
allow
children
with
and
without
physical
disabili3es
to
use
 playground
e Downtown
Ligh3ng
Project:
The
project
would
install
“green”
solar
lights
in
downtown.

The
type
of
ligh3ng
 system,
and
loca3ons
for
the
installa3on
has
already
been
iden3fied.

The
project
would
add
needed
ligh3ng
 and
be
the
first
major
solar
projec Childs
and
G
Traffic
Signal:
The
project
consists
of
the
installa3on
of
a
new
traffic
signal
for
befer
traffic
 circula3on,
new
sidewalk,
gufer,
storm
water
drainage
line,
and
sewer
catch
basin
serving
a
low
socio‐ economic
neighborhood.

The
project
wi G
and
26th

Traffic
Signal:

This
project
replaces
an
exis3ng
traffic
signal
to
meet
current
standards,
and
to
 create
befer
traffic
circula3on.

The
project
will
reduce
traffic
conges3on
and
improve
air
quality


645.1

City

State

Program

Merced

CA

Public
Safety

Merced

CA

Public
Safety

Merced

CA

Streets/Roads

Merced

CA

Streets/Roads

Merced Merced

CA CA

Streets/Roads Streets/Roads

Merced Merced Merced Merced Merced Merced Merced Merced

CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water

Merced

CA

Water

Merced

CA

Water

Merced

CA

Water

Merced Merced Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Water Water Airport Airport Airport Airport Amtrak CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Energy Energy Housing Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Yosemite
and
Stadium
Street
Safety
Measures:
The
project
includes
installa3on
of
a
new
traffic
signal,
 landscaping
and
wrought
iron
fencing
to
redirect
pedestrian
traffic
to
crosswalks
at
the
newly
signalized
 intersec3on. CCTV
&
Transporta3on
Management
Improvements: The
installa3on
of
infrastructure
including
fiber,
conduit
and
CCTV
Camera
installa3on
to
parks,
city
wells,
main
 City
corridors
and
loca3ons
in
a
community
plagued
with
gang
crimes,
graffi3
and
drug
use Street
Seal‐Coa3ng:

This
project
provides
funding
for
slurry
and
scrub
seal
treatment
of
streets
throughout
the
 city,
increasing
service
life
considerably.

Maintaining
roadways
creates
jobs
immediately,
and
provides
befer
 infrastructure
for
support
of Downtown
Streetscape
Improvements:

The
project
would
complete
needed
sidewalk
and
ligh3ng
 improvements,
and
add
brick
pavers
and
landscaping
to
connect
the
Merced
Center
and
Civic
Center
area
to
 the
downtown
core.
The
end
result
would
add
invaluable
par East
16th
Street
Community
Entrance:
This
beau3fica3on
project
would
reconstruct
a
major
entry
point
into
 Street
Overlays This
work
is
necessary
to
repair
deteriorated
streets
throughout
the
City
of
Merced.
The
work
would
include
 complete
street
overlays
(“grind
and
repave”).

The
community’s
streets
are
a
disincen3ve
to
industrial
and
 commercial
developmen Cormorant
Bridge
Construc3on G
Street
Undercrossing:

The
City
experiences
significant
traffic
delays
of
approximately
2
hours
the
BNSF
 Highway
59/Cooper
Avenue
Interse3on Childs
Avenue
Widening Airport
Drainage
Project:

Add
a
parallel
18‐inch
storm
drain
pipeline
on
Riggs
Avenue
and
rework
the
Airport
 G
Street
and
Canal
Street
Water
Main
Replacement:
Replace
deteriorated
water
main,
valves
and
complete
 Airport
Area
Sewer
Line
Replacement:

A
key
sanitary
sewer
line
crossing
the
Merced
Municipal
Airport
has
 R
Street
Environmental
Cleanup
Project:

The
project
cleans
up
groundwater
contaminated
with
gasoline
 containing
MTBE,
which
inhibits
development
of
brownfield
property
and
threatens
a
municipal
well
located
 700
feet
away
from
the
parcel
serving
a
low
soc Storm
Drain
at
Julie
and
R
Street: This
project
will
provide
an
alternate
drainage
path
for
a
storm
sewer
system
that
cannot
func3on
during
high
 flows
in
Bear
Creek
resul3ng
in
rou3ne
flooding
of
the
neighborhood.

The
construc3on
of
alternate
draina Bradley
Overpass
U3lity
Service
Reloac3on:

CalTrans
is
preparing
for
reconstruc3on
of
the
Bradley
Overpass
in
 the
City
of
Merced
in
the
year
2009.

However,
the
City
will
be
required
to
relocate
underground
u3li3es
as
 needed.

Comple3on
of
the
u3l Gerard
Avenue
Sewer
Lining
Project:

The
Gerard
Avenue
trunk
sewer
was
constructed
of
corrugated
metal
 pipe
in
the
1950's.

It
has
rusted
in
many
loca3ons
and
is
in
dire
need
of
rehabilita3on
due
to
infiltra3on
and
ex‐ filtra3on. Waste
Water
Treatment
Plant
Solids
Handling
Facili3es:
Funding
will
be
used
to
upgrade
the
solids
handling
 Waste
Water
Treatment
Plant
Phase
4
Upgrade/Expansion:

Construc3on
of
new
process
facili3es
and
 Environmental
Assessment
‐
Terminal
Project Apron
Rehabilita3on
(Westside)
‐
Prevent
Damage
to
Aircrabs Enhance
Runway
Safety
Area
(Rwy
10R)
‐
Construct
New
Taxiway Terminal
Complex
‐
Design
(Ini3al
2010) Construct
a
Second
Train
Track
‐
Modesto
Amtrak
Sta3on Modesto
Airport
Neighborhood
Empire
St Neighborhood
Revitaliza3on
Related
Construc3on
‐
Construct
a
Small
Community
Center Weed
and
Seed
Construc3on
‐
Construct
a
Small
Community
Center 5kw
Solar
Shade
Structures
in
5
City
Parks
‐install
5kw
Solar
shade
structures
in
5
City
parks
to
provide
green
 Energy
Efficient,
Green
Classroom
Retrofit
retrofit
exis3ng
modular
at
Modesto
Compos3ng
for
use
in
Resource
 100
kw
Solar
Array
at
Modesto
Compos3ng
‐install
a
100kw
solar
array
at
Modesto
Compos3ng
to
power
 Energy
Retrofits
of
Government
Buildings,
VFD
‐install
VFD
on
HVAC
units
in
City
buildings
to
reduce
energy
use 50
kw
Solar
Shade
Structures
on
3
City
Parking
Garages
‐install
50
kw
shade
structure
on
each
of
3
City
pkg
 500
kw
Solar
Roof
on
Corpora3on
Yard
Building
‐install
500
kw
Solar
roof
on
City
Corpora3on
Yard
building
to
 Partnership
for
Residen3al
Solar
Retrofits
‐install
5kw
solar
systems
on
100
low
income
and
Habitat
for
 Solar
Roofs
on
City
Government
Buildings
‐install
solar
roofs
on
6
City
buildings
to
provide
power
to
those
 Public
Housing
Moderniza3on DNA
Evidence
Collec3on,
Processing,
and
Analysis
‐
Process
DNA
Evidence
for
Unsolved
Crimes Addi3onal
Sworn
Police
Officer
Staffing/Hiring
Grant Mancini
Bowl
‐
Replace
Aluminum
Benches Modesto
Centre
Plaza
Roofing
Upgrade
 Park
Irriga3on
System
Replacement Dry
Creek
Trail
Erosion
Repair Play
Equipment
Replacement Class
II
Bike
Lanes
‐
Construct
64
Miles
of
Class
II
Bike
Lanes
City
Wide Hetch
Hetchy
Trail
‐
Construct
3
Miles
of
Bike
Trails
Along
Hetch
Hetchy
Transmission
Lines Pelandale
Avenue
Class
I
Bike
Path
‐
Construct
8
Miles
of
Bike
Path
Along
the
Pelandale
Expressway MID
Lateral
Paths
‐
Construct
34
Miles
of
Bike
and
Pedestrian
Trails
Along
Irriga3on
Canals Tuolumne
Boulevard
Extension
‐
Construct
a
2
Lane
Access
Road
to
Tuolumne
River
Regional
Park 2009
Street
Rehab
and
Reconstruc3on

Project
Descrip3on

Modesto Modesto Modesto Modesto Modesto Modesto

CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Trail
Connec3on/TRRP
Gateway‐Legion
Park
‐
Construct
1.5
Miles
of
Bike
Trails Virginia
Corridor
Construc3on
‐
Construct
2.2
Miles
of
Pedestrian
and
Bike
Lanes ADA
Curb
Ramps Pelandale
Avenue/State
Route
99
Interchange
Reconstruc3on 2009
Arterial
Street
Overlay
Project 2009
Cape
&
Slurry
Seal
Project

Modesto Modesto Modesto Modesto Modesto

CA CA CA CA CA

Streets/Roads Transit Transit Transit Transit

2009
Collector
Street
Overlay
Project Bus
Rehabilita3on Purchase
7
New
Buses Bus
Stop
Improvements
‐
Add
Shelters
and

Pavement. Bus
Maintenance
Facility
Design
&
Construc3on

Funding
Required

Jobs














160,000


15












3,650,000


25












1,000,000


25












1,000,000
 










1,500,000


30 30












3,000,000
 










1,500,000
 










4,800,000
 










2,000,000
 










1,200,000
 












100,000
 










3,500,000
 












700,000


30 40 80 80 90 20 20 25














700,000


25














294,000


25














550,000


30










10,000,000
 








28,000,000
 








27,500,000
 












368,421
 












400,000
 












400,000
 










1,578,947
 










2,000,000
 












400,000
 












300,000
 












300,000
 












200,000
 












200,000
 












700,000
 












500,000
 










1,500,000
 










2,500,000
 










2,000,000
 










5,000,000
 










7,500,000
 










1,500,000
 










4,500,000
 












100,000
 












200,000
 












600,000
 










1,000,000
 












600,000
 










2,000,000
 










1,700,000
 










4,500,000
 








18,700,000
 










5,000,000


60 80 150 10 20 20 20 20 10 15 15 10 10 20 20 50 100 100 100 30 5 45 5 5 5 6 6 10 10 10 20 20










10,000,000
 










3,000,000
 








10,000,000
 








33,000,000
 








50,000,000
 








47,000,000


25 25 25 100 100 500










35,000,000
 








47,000,000
 












500,000
 










3,000,000
 












500,000
 










8,000,000


500 500 10 10 20 40

City

State

Program

Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto Modesto

CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Tank
Safety
Fall
Protec3on Airport
Irriga3on
Well Annual
Sewer
Rehabilita3on
 Downstream
Improvements‐Pressure
Reduc3on
Valves El
Rio
Sewer
Replacement
‐
Relocate
a
Sewer
Main
Away
from
a
Riparian
Corridor Ellison
Sewer
Rehabilita3on
‐
Replace
a
Collapsed
Sewer
Main Emergency
Generators
‐
Install
Backup
Generators
at
Water
Well
and
Tank
Sites Gaseous
Chlorine
Conversion Jennings
Road
Grout
Stabiliza3on Shackelford
Crossing
‐
Rehabilitate
an
Exis3ng
Sewer
Crossing
Over
the
Tuolumne
River Strengthen
&
Replace
Waterlines Wellhead
Treatment
‐
Salida Kansas‐Needham
Soil
Remedia3on Mildred
Perkins
Water
Well

Project
Descrip3on

Funding
Required 












100,000
 












100,000
 












800,000
 










4,000,000
 










2,000,000
 












300,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,000,000


Jobs












2,000,000


15

Modesto

CA

Water

Replace
Well
#226












2,000,000


15

Modesto

CA

Water

Scenic
Lib
Sta3on
Improvements












2,000,000


15

Modesto

CA

Water

Waterford
Water
Well












2,000,000


15

Modesto

CA

Water

9th
Street
Storm
Drain
Rehabilita3on
‐
Add
a
New
Storm
Drain
Pipe












7,000,000


20

Modesto

CA

Water

Downstream
Improvements
‐
Virginia
Corridor
‐
Install
New
Water
Transmission
Pipes










11,000,000


20

Modesto

CA

Water

Downstream
Improvements
‐Yosemite
Transmission
Line
‐
Install
3
Miles
of
New
Water
Transmission
Pipe

Modesto Modesto

CA CA

Water Water

State
Route
132
Replace
Waterline Sufer
Avenue
Bypass
Rehabilita3on












7,000,000
 










2,000,000


20 20

Modesto Modesto Modesto Modesto

CA CA CA CA

Water Water Water Water

Water
Quality
Laboratory
Remodel Emerald
Trunk
Rehabilita3on
‐
Repair
a
50
Year
Old
Main
Sewer
Trunk Primary
Ouzall
Rehabilita3on Phase
1A
Wastewater
Treatment
Plant
‐
Increase
Wastewater
Capacity
by
up
to
2.5
Million
Gallons
Per
Day












4,500,000
 










1,000,000
 










9,600,000
 








23,200,000


20 20 30 40

Napa Napa Napa Napa

CA CA CA CA

CDBG CDBG Streets/Roads Water

Sidewalk
Replacement,
Los
Robles Street
Reconstruc3on,
Los
Robles Misc.
Street
Reconstruc3on
City‐wide 2009
Water
Meter
Replacement
Project










20,000,000
 










1,000,000
 










2,000,000
 








20,000,000


60 10 20 300












1,000,000


10

Napa

CA

Water

Hidden
Glen
Pump
Sta3on

Napa Napa Napa Napa

CA CA CA CA

Water Water Water Water

Dwyer
Road
Pump
Sta3on 2009
Water
Main
Replacement
Project Alston
Park
Tank
#1
Replacement Napa
Creek
Flood
protec3on














750,000
 










2,000,000
 










2,000,000
 










6,000,000


10 15 30 30












9,000,000


150

Newark

CA

Streets/Roads

Central
Avenue
Overpass
‐
Environmental
and
Design














500,000


6

Newark

CA

Streets/Roads

Thornton
Avenue
Widening
‐
Envrionmental
and
Design














500,000


6

Newark

CA

Streets/Roads

2009
Asphalt
Concrete
Pavement
Overlay
‐
Various
Streets

Newark Oakland Oakland

CA CA CA

Streets/Roads Airport Airport

2010
Asphalt
Concrete
Pavement
Overlay
‐
Various
Streets Pump
House
Replacement
at
the
Oakland
Airport Aircrab
East
Apron
and
Taxiways
‐
Phase
3












2,000,000
 










2,000,000
 








10,000,000


30 30 40










20,000,000


75

Oakland

CA

Airport

North
Field
Infield
Roadway










20,000,000


75

Oakland

CA

Airport

Levee
strengthening
at
the
Oakland
Airport










30,000,000


80

Oakland

CA

Airport

Parking
Garage
at
Oakland
Interna3onal
Airport








300,000,000


120

Oakland

CA

CDBG
















50,000


5

Oakland

CA

CDBG

Oakland Oakland

CA CA

CDBG CDBG
















40,000
 












250,000


5 8














300,000


10

Oakland

CA

CDBG

Oakland

CA

CDBG

Document
Management
for
PWA
‐
Funding
will
be
used
to
implement
an
enterprise‐class
document
 management
system
for
records
related
to
environmental
remedia3on
of
City‐owned
proper3es.

The
project
 will
leverage
the
City’s
exis3ng,
successful
investment PWA
Equipment
Services
Technology
Learning
Center
‐
Funding
will
be
u3lized
to
install
networking,
computer,
 printer,
projector,
and
related
equipment
to
establish
a
Public
Works
Agency
Equipment
Services
Division
 Technology
Learning
Center.
 Corporate–Community
Partnerships
‐
The
project
will
encourage
Oakland
businesses
and
the
City
government
 E‐Government
Network
Infrastructure
‐
E‐government
enables
the
delivery
of
informa3on
and
services
online
 through
the
Internet
or
other
digital
means.
The
use
of
the
Internet
to
deliver
government
informa3on
and
 services
will
provide
benefits
 Oakland
Head
Start
Facility
Improvements
‐
construc3on,
repair,
and
playground
development
at
seven
Head
 Start
centers Upgrades
to
the
Oakland
Conven3on
Center

Oakland

CA

CDBG

Fruitvale
La3no
Cultural
and
Performing
Arts
Center
‐
Federal
funding
will
be
used
for
construc3on
costs
(i.e.
 structural,
mechanical,
electrical,
and
plumbing
systems,
seismic
reinforcement,
elevator,
etc.)

Oakland

CA

CDBG

640
RMP
Cover,
Phase
2,
at
the
Former
Oakland
Army
Base

Oakland

CA

CDBG

Oakland

CA

CDBG

Alternate
Compu3ng
Facility
for
Disaster
Recovery
‐
The
goal
on
this
project
to
establish
a
partnership
between
 the
City
of
Oakland
and
another
city
similar
in
size
to
construct
geographically
dispersed
disaster
recovery
 sites. Deconstruc3on
of
Historic
Warehouses
803
and
804
at
the
Former
Oakland
Army
Base

Oakland

CA

CDBG

3
new
libraries


Oakland

CA

CDBG

Seismic
Retrofit
and
Safety
Upgrades
to
H.J.
Kaiser
Conven3on
Center

Oakland

CA

CDBG

On‐going
park
improvement
projects
iden3fied
in
the
approved
Park
Priori3za3on
project
list











90,000,000


60

Oakland

CA

CDBG

Expand,
relocate
and
upgrade
17
libraries


Oakland Oakland Oakland

CA CA CA

Energy Energy Energy

Fuel
Cell
Vehicle
Program Sustainable
Upgrades
to
Aqua3c
Centers FY09
funding
is
requested
to
support
the
following
elements
of
this
effort:
the
East
Bay
Green
Jobs
Project;
the









270,000,000
 










5,000,000
 








10,000,000
 










3,800,000


180 5 12 45

3 5 10 10 10 10 10 10 10 10 10 10 15














700,000


10










15,000,000


10












1,000,000


12












1,700,000


18












1,584,000


19












2,400,000


30










60,000,000


40










60,000,000


40

City

State

Program

Oakland

CA

Energy

Project
Descrip3on

Oakland

CA

Energy

Oakland Oakland Oakland Oakland Oakland Oakland

CA CA CA CA CA CA

Energy Energy Housing Public
Safety Public
Safety Public
Safety

Oakland Oakland Oakland

CA CA CA

Public
Safety Public
Safety Public
Safety

Oakland Oakland

CA CA

Public
Safety Public
Safety

Oakland

CA

Public
Safety

Oakland Oakland Oakland

CA CA CA

Public
Safety Public
Safety Public
Safety

Emergency
Signal
Vehicle
Pre‐emp3on “Grow
Our
Own”
Police
Recruitment
Program
‐
The
City
seeks
funding
to
conduct
personal
recruitment
visits,
 Fleet
Replacements

Oakland Oakland Oakland Oakland

CA CA CA CA

Public
Safety Public
Safety Public
Safety Public
Safety

Oakland Oakland

CA CA

Public
Safety Public
Safety

Oakland

CA

Public
Safety

Replacement
Helicopter
‐
One
helicopter
to
replace
outdated
unit
$2,500,000.

The
helicopter
unit
provides
 New
Mul3‐Service
Training
facility
for
Police
and
Fire
Departments 311
Ci3zen
Rela3onship
Management
(CRM)
System
‐
Funding
will
provide
Oakland
ci3zens
a
non‐emergency
 Enhanced
Public
Safety
Equipment
Program
‐
The
City
seeks
funding
to
install
audio
and
video
recording
 devices
in
patrol
and
specialized
vehicles;
purchase
firearms,
holsters,
and
related
equipment;
purchase
and
 install
Dell
laptops
for
specialized
field
work. Public
Safety
Informa3on
Technology
Infrastructure
Enhancement
‐
The
City
of
Oakland
requests
$3.61
million
 Oakland
Fire
Boat
‐
The
fireboat
responds
to
water
emergencies
and
provides
mutual
aid
assistance
to
other
 jurisdic3ons.
The
Port
of
Oakland
is
a
poten3al
terrorist
target.

Opening
this
sta3on
enhances
our
capability
to
 quickly
respond
to
terrorists. Replacement
of
three
fire
sta3ons


Oakland

CA

Public
Safety

Oakland

CA

Public
Safety

Oakland

CA

Public
Safety

Oakland

CA

Streets/Roads

Oakland

CA

Oakland

Funding
Required

Jobs

Metro
Area
Green
Ins3tute
‐
The
Metro
Area
Green
Ins3tute
will
serve
as
a
clearinghouse
for
low‐carbon
 economic
development
efforts
na3onally.
The
Ins3tute
will
compile
and
disseminate
data
gleaned
through
the
 exis3ng
program
sand
provide
technical
a Sustainable
Upgrades
to
Fire
Sta3ons












5,000,000


60

Sustainable
Upgrades
to
Civic
Center
Buildings Sustainable
Upgrades
to
Libraries Oakland
Community
Land
Trust
‐
Funding
will
be
u3lized
to
purchase
and
rehabilitate
foreclosed
proper3es
as
 Prisoner
Transport
Vehicles
‐

Since
the
OPD
Jail
closure
in
2005,
police
officers
shufle
between
North
County,
 Mobile
Incident
Command
Post
‐
OPD
currently
has
two
older,
outdated
Mobile
Command
Posts.

Both
 Oakland’s
Special
Prosecu3on
Project
‐
Funding
will
support
the
implementa3on
of
a
local
Special
Prosecu3on
 Team
as
part
of
the
Mayor’s
Crime
Reduc3on
Strategy.

The
Project
will
reduce
quality
of
life
incidents
and
 address
low‐level
crimes
 Emergency
Generators Various
capital
improvements
at
exis3ng
fire
sta3ons
and
public
safety
facili3es
 Automa3c
Vehicle
Loca3ng
(AVL)
Systems
‐
Funding
will
be
u3lized
to
install
Automa3c
Vehicle
Loca3ng
 systems
on
all
public
vehicles. Oakland
Police
Department
Data/Voice
Network
‐
The
project
will
involve
the
re‐cabling
of
the
network
 Oakland
CompStat
‐
Funding
will
be
u3lized
to
develop,
design
and
deploy
a
centralized
and
consolidated
 criminal
data
repository
system
in
Oakland. Patrol
Vehicle
Acquisi3on
‐
Funding
will
be
u3lized
to
increase
the
police
vehicle
fleet
from
399
vehicles
to
429
 with
Federal
funding
through
the
acquisi3on
of
30
addi3onal
police
vehicles.










15,000,000
 








25,000,000
 








22,500,000
 








20,000,000
 












260,000
 












503,333


80 90 100 240 3 6














612,000
 










8,000,000
 








15,000,000


6 10 10












1,056,306
 










1,100,000


12 12












1,325,000


16












1,740,000
 












550,000
 










1,900,000


20 23 24










38,000,000
 










2,500,000
 








50,000,000
 










3,000,000


30 30 33 36












3,300,000
 










3,610,000


39 43












4,000,000


48










90,000,000


60












5,600,000


67

Surveillance
Camera
Network
‐
A
citywide
camera
system
will
be
installed
to
enhance
the
Department’s
ability
 to
respond
to
criminal
ac3vity
and
inves3gate
crimes.
(OPD).

Funds
would
convert
space
in
the
Eastmont
 Police
Sta3on
into
a
state
of
the
art
facility. Interoperable
Communica3ons
‐
Requested
funding
will
bring
a
master
communica3ons
site
on‐line
for
the
 City
of
Oakland
to
meet
P‐25
compliance,
and
will
include
simulcas3ng
and
other
features
which
will
enhance
 the
communica3ons
network
capacity
 New
Police
Administra3on
Building,
to
replace
seismically
vulnerable
and
obsolete
Admin
Building












8,000,000


96








450,000,000


300












2,700,000


10

Streets/Roads

Adeline
Street
Bridge
Repair
‐
The
improvements
include
repair
of
damages
in
abutment
No.
1
and
to
provide
 access
behind
abutment
No.
2,
replace
bridge
expansion
joint
material
and
seal
and
restriping
the
bridge
deck Airport/Coliseum
Adap3ve
Traffic
Signal
System












2,200,000


12

CA

Streets/Roads

MacArthur
Blvd
Streetscape
Project












1,900,000


20

Oakland

CA

Streets/Roads

Traffic
Signal
Upgrades












2,000,000


20

Oakland

CA

Streets/Roads












1,230,000


23

Oakland

CA

Streets/Roads












2,900,000


25

Oakland

CA

Streets/Roads

7th
Street,
West
Oakland
Transit
Village
Streetscape
Project
‐
The
improvements
include
construc3on
of
bulb‐ outs,
ADA
ramps
and
installa3on
of
bike
lanes,
construc3on
of
medians
with
landscaping,
improvement
of
 sidewalks
and
installa3on
of
streetlights The
Fruitvale
Alive
Streetscape
Project
‐
The
improvements
include
construc3on
of
bulb‐outs,
ADA
ramps
and
 installa3on
of
bike
lanes,
plan3ng
trees,
installa3on
of
signs
to
improve
pedestrian
circula3on,
improvement
of
 sidewalks
and
installa3on
of
streetlights. Interna3onal
Blvd
Streetscape
Project












2,750,000


30

Oakland

CA

Streets/Roads

Coliseum
Pedestrian
Walkway
Seismic
Replacement












5,000,000


40

Oakland

CA

Streets/Roads

Curb
Ramp
Installa3on

(approx.
6000
loca3ons) 








15,000,000


40

Oakland

CA

Streets/Roads

Sidewalk
Damage
Repair
(8000
loca3ons)










25,000,000


50

Oakland

CA

Streets/Roads

14th
Avenue
Streetscape
Project

Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland Oakland

CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water

New
Municipal
Service
Center
‐
replace
exis3ng
service
center
on
leased
ground
prone
to
liquifac3on
in
seismic
 Infrastructure
Improvements
to
the
Oakland
Army
Base Repair
of
Structurally
Obsolete
Bridges Street
Resurfacing
‐

(approx
170
Lane
miles)
lane
miles
of
street
resurfacing,
including
sidewalk,
curb,
gufer
 12th
Street
Reconstruc3on Oakland
Inner‐Harbor
Tidal
Canal
Easement
‐
The
proposed
easement
will
allow
the
City
to
construct
 Oakland
Inner‐Harbor
Tidal
Canal
Feasibility
Study
‐
The
City
of
Oakland
requests
the
authoriza3on
of
$250,000
 Waterside
Wireless
Surveillance
System,
GR5,
Phase
2 Portable,
wireless
video
cameras
for
spot
surveillance
and
alert
repor3ng Cryer
Boatworks
Site,
Public
Beach
Access
‐
The
Cryer
Boatworks
Site
is
currently
being
developed
as
a
public
 High
Priority
Storm
Drain
System
Improvements 
Design/Build
Contract
for
B60‐63
Wharf
Reconstruc3on,
APL Upgrades
to
Sanitary
Sewer
System,
including
Pump
Sta3ons
to
eliminate
overflows












5,000,000
 






220,000,000
 






100,000,000
 








20,000,000
 








50,000,000
 










3,600,000


60 60 67 100 100 250














250,000
 












750,000
 










2,450,000
 










3,800,000
 








70,000,000
 






130,000,000


3 9 30 45 47 85








130,000,000


85

City

State

Program

Oakland

CA

Water

Final
Deepening
of
the
Inner
Harbor
Turning
Basin
to
‐50
Feet,
mean
Lower
Low
Water,
Port
of
Oakland

Project
Descrip3on

Funding
Required 










8,000,000


Jobs 96

Oakland

CA

Water

Clean
Water,
Safe
Parks
Program



Ontario

CA

CDBG

Ontario Ontario

CA CA

CDBG CDBG

Ontario

CA

CDBG

Ontario

CA

Public
Safety

Ontario

CA

Streets/Roads

Ontario

CA

Streets/Roads

Ontario

CA

Streets/Roads

Ontario Ontario

CA CA

Streets/Roads Streets/Roads

Ontario

CA

Streets/Roads

Ontario

CA

Water

Ontario Ontario Ontario Ontario Palm
Desert

CA CA CA CA CA

Water Water Water Water CDBG

Veteran's
Park
Community
Center
‐
This
project
includes
a
2,500
sq
b
community
center
constructed
to
LEED
 standards
and
rehabilita3on
of
a
park
and
sportsfield.
Park
improvements
include
an
addi3onal
sportsfield,
tot
 lot
and
picnic
areas. Ontario
Downtown
Plaza
‐
This
project
constructs
an
urban
plaza
consis3ng
of
an
amphitheatre,
arbor
 Guas3
Parking
Structure
‐
The
Historic
Guas3
District
project
includes
development
of
hotels,
offices,
retail
 stores,
restaurants
and
entertainment
venues.

The
parking
structure
includes
750
spaces
needed
for
phase
1
 of
the
project.

 Ontario
Civic
Center
Improvements
‐
This
project
includes
complete
rehabilita3on
of
the
exis3ng
City
Hall,
 construc3on
of
a
new
public
parking
facility,
and
installa3on
of
equipment
for
an
Emergency
Opera3ons
 Center.

The
project
implements
the
City' Emergency
Signal
Vehicle
Pre‐emp3on
Devices
at
Signalized
Intersec3ons
‐
This
project
would
install
hardware
 in
Traffic
Signals
to
improve
public
safety
and
emergency
vehicle
response
3mes. Sidewalk
Construc3on
&
Repair
‐
This
project
would
construct
new
sidewalks
and
repair
exis3ng
ones,
at
sites
 to
comply
with
ADA
standards
and
within
"Safe
Routes
to
Schools"
areas. Pavement
Rehabilita3on
‐
This
project
consist
of
pavement
rehabilita3on
on
13
miles
of
City
streets
u3lizing
 rubberized
asphalt
with
waste
3re
grindings
‐
a
"Green"
project. Grove
Ave
Grade
Separa3on
‐
This
project
constructs
a
highway‐railroad
grade
separa3on
to
facilitate
goods
 movement,
provide
added
safety
and
air
quality
improvements
and
improve
circula3on. Francis
Street
Storm
Drain
‐
This
project
consists
of
construc3ng
an
84"
to
132"
reinforced
concrete
pipe
and
a
 North
Milliken
Ave
Grade
Separa3on
‐
This
project
constructs
a
highway‐railroad
grade
separa3on
to
facilitate
 goods
movement,
provide
added
safety
and
air
quality
improvements
and
improve
circula3on
for
Ontario
 Interna3onal
Airport. New
Model
Colony
Backbone
Infrastructure
‐
This
project
will
jump
start
the
construc3on
of
13,000
residen3al
 units
in
Ontario
including
14
miles
of
roadway
serving
3,500
acres.

Improvements
will
consist
of
roadway
 circula3on,
flood
protec3on,
etc. California
Friendly
Landscape
‐
This
project
replaces
exis3ng
turf
with
drought
tolerant
landscape
to
 incorporate
water
conserva3on
in
public
medians
and
park
land
throughout
the
City. Ontario
City
Well
#43
‐
This
project
includes
the
construc3on
of
a
new
Water
Well
to
increase
the
capapcity
of
 Chino
Desalter
Expansion
‐
This
joint,
regional
project
pumps
and
treats
polluted
groundwater,
removes
salts
 Mills
Creek
Wetlands
‐
The
wetlands
are
a
35
acre
site
adjacent
to
3
miles
of
recrea3onal
trails,
camping
and
 Recycled
Water
Service
Main
Extensions
‐
This
project
would
expand
the
recycled
water
distribu3on
system
to
 Apartment
Trash
Enclosures








150,000,000


100












2,500,000
 










3,500,000


105 147










11,250,000


472










29,000,000


1218














550,000


23












1,798,000


75












3,920,000


164












8,400,000
 








15,000,000


352 630










20,000,000


840








100,000,000


4200












1,000,000
 










2,265,000
 








15,000,000
 








17,000,000
 








20,100,000


42 95 630 714 844

Palm
Desert

CA

CDBG

Thirty‐six
Acre
Park












2,800,000


10










18,000,000


Palm
Desert

CA

CDBG

Community
Aqua3cs
Center

65










30,000,000
 












500,000
 












500,000
 










4,500,000
 










5,000,000


Palm
Desert Palm
Desert Palm
Desert Palm
Desert Palm
Desert

CA CA CA CA CA

Energy Housing Streets/Roads Streets/Roads Streets/Roads

Corpora3on
Yard
Solar
Panels Sixteen‐unit
Rehabilita3on
Affordable
Housing Alessandro
Roadway
Redevelopment El
Paseo
Median
Road
Improvements Monterey
Interchange
Reconfigura3on

85 5 6 50 50

Palm
Desert

CA

Streets/Roads

North
Sphere
Drainage
Program












5,000,000


60










15,000,000


Palm
Desert

CA

Streets/Roads

60

Further
Portola
Interchange










20,000,000


Palm
Desert

CA

65

Streets/Roads

Portola
Avenue
Widening










10,000,000


Palm
Desert

85

CA

Transit

Bus
Shelters

Pasadena Pasadena

CA CA

CDBG CDBG

8 8

Pasadena

CA

CDBG

Replacement
of
the
playgrounds
at
Sunnyslope
and
San
Rafael
Parks.

Will
use
recyclable
materials
and
wood
 Replacement
of
athle3c
field
ligh3ng
at
Brookside,
Victory,
Villa
and
Jefferson
Park
fields.

Will
use
the
most
 energy
efficient
ligh3ng
available. Robinson
Park
Community
Building
and
Gymnasium.

Silver
LEED
ra3ng.














200,000
 












500,000


Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Pasadena

CA

Energy

Storm
Water
Capture
at
Power
Plants:
Capture,
store,
treat
and
use
rain
water
from
City's
two
major
storm
 drains.
Treated
rain
water
will
be
used
to
supplement
make‐up
water
for
cooling
towers
and
reduce
equivalent
 amount
of
potable
water
currently
used. Replace
HVAC
system,
plumbing
and
gufer
system
and
repair
the
roof
at
the
Building
Maintenance
Building
at
 the
City
Yards. Installa3on
of
microturbine/generator
to
an
exis3ng
high
pressure
water
line
at
the
Millard
Pressure
Reducing
 Sta3on.
Renewable
energy.
genera3on Installa3on
of
Solar
Photovoltaic
systems
on
the
roofs
of
the
Gas
Compressor
Building
and
Pump
Shop
located
 at
Pasadena's
Broadway
Power
Plant. Repairs
and
upgrades
to
the
following
seven
libraries
to
increase
energy
efficiency.

Cool
roof
will
result
in
 decreased
energy
usage. Replacement
of
the
median
island
irriga3on
on
Sierra
Madre
Blvd.
Installa3on
of
the
most
energy
efficient
 irriga3ons
systems
available
and
drought
tolerant
plants. Install
new
substa3on
at
Chester.

Pasadena Pasadena Pasadena

CA CA CA

Public
Safety Public
Safety Public
Safety

Radio
Replacement
Project:
Design
and
replace
infrastructure
and
hand‐held
radios
for
field
opera3ons
staff. Security
Upgrade:
Install
new
block
wall
at
Santa
Anita
Substa3on
to
meet
new
standards
for
Walnut
street. Installa3on
of
exhaust
ven3la3on
systems
at
the
following
eight
fire
sta3ons:
#31,
32,
33,
34,
36,
37,
38
and
39.

Pasadena

CA

Public
Safety

Security
Upgrade:
Install
block
wall
at
Goodrich
Substa3on.

Pasadena

CA

Public
Safety

Pasadena

CA

Pasadena

CA

Pasadena Pasadena












3,000,000


51










15,000,000


255

Install
new
energy
efficient
HVAC
automa3on
system
at
the
Police
Department’s
firing
range.
















50,000


1

Installa3on
of
an
energy
efficient
cool
roof
at
Fire
Sta3on
39.














115,000


2














250,000


4














282,000


5














355,000


6














900,000


15












1,300,000


22












1,300,000


22












3,000,000
 










2,500,000
 












150,000


51 0 3














536,320


9














500,000


9

Earthquake
repairs
to
Fire
Sta3on
39.












1,275,000


20

Public
Safety

Seismic
Upgrade:
Retrofit
all
power
facili3es
to
withstand
major
earthquakes.












1,500,000


25

Public
Safety

Seismic
retrofit
of
the
Public
Works
Building
at
the
City
Yards.
Silver
LEED
ra3ng.












3,400,000


58

CA

Public
Safety












3,750,000


63

CA

Public
Safety

Replacement
or
installa3on
of
security
lights
at
the
13
City
parks.

Will
use
the
most
energy
efficient
ligh3ng
 available. Earthquake
repairs
to
Fire
Sta3on
33.












4,275,000


71

City

State

Program

Project
Descrip3on

Pasadena

CA

Schools

Pasadena

CA

Streets/Roads

Installa3on
of
new
playgrounds
and
facility
improvements
for
school/park
sites
at
Cleveland
Elementary
School
 and
Marshall
Fundamental
School.

Will
integrate
recycled
plas3c
and
rubber
for
play
equipment. Installa3on
of
residen3al
street
ligh3ng
on
Daisy
from
Villa
to
Del
Vina.
LED
ligh3ng.

Pasadena Pasadena Pasadena Pasadena Pasadena

CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Installa3on
of
residen3al
street
ligh3ng
on
Lakewood
Place.
LED
ligh3ng. Installa3on
of
residen3al
street
ligh3ng
on
Morningside
from
Daisy
to
Eastern. Installa3on
of
residen3al
street
ligh3ng
on
Del
Rey
from
Woodlyn
to
Washington. Installa3on
of
a
traffic
signal
at
Fair
Oaks
and
Fillmore.

Traffic
signals
will
u3lize
LED
indicators. Installa3on
of
a
traffic
signal
at
Mountain
and
City
Yards.

Traffic
signals
will
u3lize
LED
indicators.

Pasadena Pasadena Pasadena Pasadena Pasadena Pasadena Pasadena Pasadena

CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Pasadena

CA

Streets/Roads

Installa3on
of
residen3al
street
ligh3ng
on
Carmelo
from
Villa
to
Lambert. Installa3on
of
a
traffic
signal
at
Foothill
and
PCC/Ice
Rink
Driveway.

Traffic
signals
will
u3lize
LED
indicators. Installa3on
of
a
traffic
signal
at
Chester
and
Cordova
Traffic
signals
will
u3lize
LED
indicators. Bafery
back‐up
for
traffic
signal
intersec3ons
city‐wide. Roadway
improvements
at
Hahamongna
Watershed
Park
for
safety
purposes
including
resurfacing,
striping
and
 Replacement
of
incandescent
traffic
signal
indicators
with
light‐emiqng
diode
(LED)
indicators. Construc3on
of
street
improvements
on
Walnut
St.
4,500
3res
to
be
recycled
through
the
use
of
1,800
tons
of
 Construc3on
of
extension
of
Kinneloa
Avenue
from
Colorado
Blvd.
to
Foothill
Ave.
and
the
extension
of
Walnut
 Street.

4,000
3res
to
be
recycled
through
the
use
of
1,600
tons
of
rubberized
asphalt.

Approximately
60
new
 street
trees
will
be
planted. Resurfacing
34
miles
of
road
on
the
select
street
system
with
rubberized
asphalt.

Pasadena

CA

Water

Pasadena Pasadena Pasadena Pasadena Pasadena Pasadena Pasadena Pifsburg

CA CA CA CA CA CA CA CA

Water Water Water Water Water Water Water CDBG

Pifsburg

CA

CDBG

Pifsburg

CA

CDBG

Pifsburg

CA

CDBG

Pifsburg

CA

CDBG

Pifsburg

CA

Public
Safety

Pifsburg

CA

Streets/Roads

Pifsburg Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton Pleasanton

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Pleasanton

Funding
Required

Jobs














500,000


8
















86,000
 














74,000
 














50,000
 












147,000
 












200,000


1 1 1 2 3














200,000
 












171,000
 












230,000
 












278,000
 












450,000
 










1,600,000
 










2,400,000
 










2,600,000


3 3 4 5 7 27 40 44












5,200,000


88










15,600,000


265














280,000
 












520,000
 












600,000
 












600,000
 










1,100,000
 










1,200,000
 










4,600,000
 










6,100,000


5 9 10 10 20 20 78 100












2,700,000


40












7,000,000


50












9,500,000


65










15,000,000


90










22,000,000


150












1,800,000


4

Streets/Roads Amtrak CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Public
Safety Public
Safety Public
Safety Streets/Roads Water Water Water












1,250,000
 












800,000
 Roadway
Expansion:
Addi3onal
lanes
on
West
Leland
Road
adjacent
to
BART
rapid
transit
sta3on. Construc3on
of
permanent
ACE
train
sta3on
at
Old
Bernal,
surface
parking,
landscaping,
run
off
mi3ga3on
and
 










7,000,000
 










1,500,000
 Fire
House
Arts
Center
Parking
Construc3on 












500,000
 American's
with
Disabili3es
Act
Compliance:
Sidewalk
and
ramp
repairs/upgrades 










1,200,000
 Aqua3c
Center
Deck
and
Pump
repairs 












350,000
 Civic
Center
ADA
accessibility
compliance
and
building
upgrades 










2,600,000
 Install
Trail
Connec3on:
580/680
undercrossing
to
connect
mul3ple
trails
and
allow
access
to
mul3ple
ci3es
 






170,000,000
 Library
and
City
Hall
Complex
Expansion 












350,000
 Fire
House
Arts
Center
Solar
System
for
Public
Community
Building 












500,000
 Solar
Panels
and
roof
for
Community/Senior
Center 










1,200,000
 Municipal
Opera3ons
Service
Center
Solar
Panels 












400,000
 Police
Department
Command
Vehicle 












250,000
 Police
Department
SWAT
Team
Vehicle 










1,000,000
 Public
Safety
radios,
mobile
and
portable Bernal
Bridge:
Construct
second
Bernal
Avenue
bridge
over
the
Arroyo
Del
Valle
adjacent
to
the
exis3ng
bridge,
 










5,000,000
 












450,000
 Del
Valle
Parkway/Nevada
Street
Sewer
Addi3ons:
The
Del
Valle
Pkwy
Sewer
line
will
provide
relief
in
exis3ng
 












209,000
 Del
Valle
Parkway
Water
Main
Extension:
Del
Valle
Water
main
extension
will
improve
water
system
quality
 










6,300,000
 EALS/EARS
Pump
Sta3on

25 25 100 25 50 50 100 100 300 25 25 75 5 5 10 100 50 75

CA

Water

Sanitary
Sewer
Pump
Sta3on
S‐6

Plymouth

CA

Streets/Roads

Main
Street
Reconstruc3on

Plymouth

CA

Streets/Roads

Plymouth

CA

Plymouth

Garfield
Well
Electrical
Upgrades.
Contract
award
pending,
clearer
communica3on
resul3ng
in
reduced
 unnecessary
trips
and
improved
efficiency. Villa
Well
Electrical
Upgrades.

Project
is
already
udnerway. Rehabilita3on
of
the
Arroyo
Parkway
storm
drain
from
Del
Mar
Ave.
to
Fillmore
St. Sewer
capacity
upgrades
through
the
replacement
or
relief
of
exis3ng
sewer
pipes
that
are
hydraulically
 Gloriefa
Booster
Pump
electrical
upgrades.
Will
improve
energy
efficiency
in
pumping
equipment. Jones
Booster
Pump
electrical
upgrades.

Will
improve
energy
efficiency
in
pumping
equipment. Eastside
Well
Collector
Pipleine‐Phase
1:
Increased
reliability
of
water
supply. Eastside
Well
Collector
Pipleine‐Phase
2:
Increased
reliability
of
water
supply Fire
Sta3on
84:

Fire
Sta3on
and
paramedic
center
in
coopera3on
with
Contra
Costa
County
Fire
Protec3on
 District. California
Theater:

First
phase
restora3on
of
an
exis3ng
historic
theater
as
a
performing
arts
center
with
fixed
 sea3ng. Marina
Hospitality
and
Culinary
Ins3tute:

4‐story
building
in
coopera3on
with
Los
Medanos
College
for
job
 training
in
hospitality
food
service
industry. Enean
Theater
Community
Center:

Restora3on
of
exis3ng
theater
as
a
mul3‐use
performance
and
community
 center. Vidrio
Teacher
Housing:

a
70
unit
mixed‐use
housing
project
to
create
a
living/learning
center
for
future
and
 new
teachers
in
coopera3on
with
Los
Medanos
College
and
Pifsburg
School
District. Gang
Enforcement/Educa3on
Team:

Hiring
and
equiping
of
officers
for
the
crea3on
of
a
dedicated
team
to
 work
with
school
district
on
gang
preven3on
and
street
enforcement
ac3vi3es. Class
II/III
Bikeways:

Three
projects
on
exis3ng
roads
to
provide
safe
bike
routes
through
the
city.

75












4,290,000


100














190,000


10

Storm
Drain
System
Reconstruc3on












1,074,000


16

Streets/Roads

Local
Street
Intersec3on
Safety
Improvements.












1,896,000


20

CA

Water

Add
a
1.0
MG
water
storage
tank












1,500,000


14

Plymouth

CA

Water

Phase
I
Wastewater
Treatment
Plant
Improvements












1,500,000


30

Rancho
Cordova

CA

CDBG












1,500,000


200

Rancho
Cordova

CA

Streets/Roads

Rancho
Cordova
Children's
Museum.

Conversion
of
a
City‐owned
office
building
to
a
museum
that
will
be
used
 for
K‐8
students,
and
will
feature
rota3ng
displays
on
many
subjects.

Total
Project
Cost:

$2,000,000. White
Rock
Neighborhood
Pedestrian
Safety
Improvement
Project.

Improvements
include
ADA
accessible
 ramps,
sidewalk
repairs,
traffic
calming
measures,
and
bicycle
lanes
where
possible.

Total
Project
Cost:

 $1,100,000.














800,000


300

City

State

Program

Rancho
Cordova

CA

Streets/Roads

Rancho
Cordova

CA

Streets/Roads

Rancho
Cordova Rancho
Cordova Rancho
Cordova Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redding Redlands Redlands Redlands Redlands Redlands

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water CDBG Energy Public
Safety Streets/Roads Streets/Roads

Redlands Redlands

CA CA

Streets/Roads Streets/Roads

Redlands

CA

Streets/Roads

Douglas
Road
Improvements.

The
project
will
widen
Douglas
Rd
to
five‐lanes
from
Rancho
Cordova
Pkwy
to
 Americanos
Blvd
and
construct
intersec3on
improvements
at
Rancho
Cordova
Pkwy
and
Americanos
Blvd.



 Total
Project
Cost:

$15,000,000. Interna3onal
Drive
Extension
and
Bridge
over
the
Folsom
South
Canal.

Federal
funds
are
requested
to
mi3gate
 a
federally‐owned
obstruc3on
that
restricts
access
to
job
centers,
educa3on,
shopping,
and
public
transit.

 Total
Project
Cost:

$17,000,000. Road
Rehabilita3on
Projects
to
include
asphalt
overlay
on
several
Coloma
Rd,
McGregor
Dr,
Laurelhurst
Dr,
Old
 White
Rock
Road
Improvements,
Sunrise
to
City
Limits
Project.

Request
for
improvements,
widening,
and
new
 Sunrise
Boulevard
Improvements.

Widening
of
Sunrise
Blvd
to
4
lanes
with
intersec3on
improvements
and
the
 Construc3on
of
a
new
policy
facility
to
replace
aging,
cramped
building. Infrastructure
elements
of
S3llwater
Business
Park
 Parkview
Avenue
Improvements
‐
Striping
Modifica3on
and
Crosswalk
Addi3on Signalize
Intersec3on
‐
Shasta
View
and
Rancho
Road Signalize
Intersec3on
‐
Three
Leg
Intersec3on
at
Court
Street/Eleventh
Street Signalize
Intersec3on
‐
Three
Leg
Intersec3on
at
Old
Alturas
Rd./Victor
Ave. Browning
Street
Widening
Project
‐
Churn
Creek
Road
to
Gabriel
Court Buenaventura
Blvd.
Shoulder
Widening/Bike
Lanes
‐
Lakeside
to
Placer Hilltop
Drive
Widening
‐
Interstate
5
to
Lake
Blvd Roadway
Overlays
and
Seals
‐
Various
Areas Extend
Shasta
View
Drive
from
Rancho
Road
to
Airport
Road. 24"
water
line
and
new
well
‐
Shasta
View
Drive
to
Rancho
Road
 S3llwater
WWTP
ouzall
diffuser
project S3llwater
WWTP
expansion Boulder
Creek
wastewater
interceptor Mary
Street
lib
sta3on/force
main Oasis
Road
water
line Safety
Hall
Replacement
Project
‐
Funds
the
acquisi3on
of
property,
design
and
construc3on
of
a
replacement
 City
Facility
HVAC
Replacement
Project
–
Replaces
the
City’s
energy
inefficient
hea3ng,
ven3la3on
and
air
 Crime
Control
Research
Program
–
Imbeds
a
criminologist
in
the
Redlands
Police
Department,
which
will
 Acquire
rights‐of‐way
and
widen
Church
Street
from
Clark
Street
to
Colton
Avenue. California
St/Redlands
Blvd
Improvements
‐
Realign
and
widen
California
St
at
Redlands
Blvd
intersec3on
to
 eliminate
offset
intersec3on,
install
new
traffic
signal
and
construct
storm
drain
structure
to
convey
100‐year
 storm
flow. Redlands,
Alabama,
Colton
Improvement
Project
‐
Phase
1
‐
Acquire
rights‐of‐way
and
widen
Redlands
Blvd
at
 Redlands,
Alabama,
Colton
Improvement
Project
‐
Phase
2
‐
Acquire
rights‐of‐way
and
widen
Redlands
Blvd.
at
 Alabama
Street
and
widen
and
realign
Alabama
Street
at
Redlands
Blvd. Street
Maintenance
Project
‐
Grind
and
resurface
various
streets
within
the
City
to
extend
useful
life
of
streets.

Project
Descrip3on

Redlands Redlands Redlands Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach

CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Water Water CDBG CDBG CDBG CDBG CDBG CDBG Energy Public
Safety Transit Transit Transit

Traffic
signal
installa3on
at
intersec3ons
of
Stuart
Ave
and
Eureka
St;
at
Eureka
St
and
Colton
Ave;
6th
St
at
 Downtown
Storm
Drain
Replacement
Project
‐
Encourages
Downtown
Redlands’
economic
development
by
 Recycled
Water
Project
‐
expansion
of
exis3ng
system
including
construc3on
of
two
reservoirs,
a
pump
sta3on
 California
Coastal
Trail
&
Bikeway
Improvements Harbor
Patrol
Building North
Branch
Library Regional
Transit
Center Seaside
Lagoon
Rehabilita3on Wilderness
Park
Reforesta3on
 Greening
of
North
Branch
Library
 Emergency
Opera3ons
Center
Upgrades Bus
Stop
Improvements CNG
Bus
Purchases CNG
Refueling
Sta3on

Redondo
Beach Redondo
Beach Redondo
Beach Redondo
Beach

CA CA CA CA

Water Water Water Water

Harbor
Area
Catch
Basin
Inserts
‐
Pilot
Program Harbor
Trash
Skimmer
‐
Pilot
Project Pier
Roof
Gufer
Diversion
Project Wet
Weather
Bacterial
TMDL
‐
Alta
Vista
Diversion
and
Re‐use
Project

Rialto

CA

CDBG

Code
Enforcement
Project

Rialto Rialto Rialto Rialto Rialto

CA CA CA CA CA

CDBG CDBG CDBG CDBG Public
Safety

Curb/Gufer
and
Sidewalk
Improvement
Project Install
Pre‐Fabricated
Restroom
Facili3es
at
City
Parks Kris3na
Dana
Hendrickson
Cultural
Center
/
Museum
Rehabilita3on
&
Improvements Street
Widening
and
Improvement
Project Hire
five
(5)
Police
Officers
and
provide
equipment
for
these
Officers

Rialto Rialto Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside Riverside

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Water Water Airport Energy Energy Energy Energy Housing Streets/Roads Streets/Roads Water Water Water Water Water

Digester
Cover
Demoli3on
Project Sewer
Lib
Sta3on
Replacement
Project North
Side
Taxiway Retrofit
and
redesign
all
Riverside
Public
U3li3es
office
loca3ons
for
op3mal
energy
efficiency Photovoltaic
Installa3on
at
the
Riverside
Conven3on
Center Prepare
incen3ve
rate
structure
and
deploy
technology
for
air
condi3oning
cycling
during
summer
peak
period Thermal
energy
storage‐
procure
thermal
energy
storage
technology
for
commercial
demand
response
system
 Indiana
4‐Plexes
Rehabilita3on
Project Van
Buren
Boulevard
Widening
‐
Santa
Ana
River
to
Jackson
Street Arterial
Streets
Rehabilita3on Recycled
Water
Distribu3on
System
Phase
1 Techite
Pipe
Cross
Town
Feeder
Replacement The
San
Bernardino
Water
Transmission
System Water
Distribu3on
Main
Replacement
Project The
Linden
and
Evans
Reservoirs
Replacement
project

Sacramento

CA

Airport

Execu3ve
Airport

Funding
Required

Jobs










12,000,000


500












8,600,000
 








20,000,000
 










6,000,000
 








11,000,000
 








41,900,000
 








42,500,000
 












425,000
 












450,000
 












325,000
 












325,000
 












450,000
 












355,000
 










1,400,000
 










5,000,000
 










4,000,000
 










2,000,000
 










2,000,000
 










5,000,000
 










4,500,000
 










3,600,000
 










8,300,000
 








45,000,000
 










1,000,000
 












500,000
 










2,500,000


500 500 500 600 145 354 4 5 5 5 8 9 19 56 100 33 33 35 38 45 104












5,800,000
 










4,000,000
 










8,000,000
 










2,000,000
 










2,000,000
 










8,000,000
 










7,300,000
 










3,000,000
 










2,000,000
 










5,000,000
 










4,000,000
 








10,000,000
 










1,000,000
 










2,000,000
 












500,000
 










1,200,000
 










1,800,000
 












600,000
 












250,000
 












500,000
 












250,000
 










2,250,000
 












250,000
 










1,000,000
 










2,000,000
 










1,060,000
 










2,000,000


2 6 6 6 10














750,000
 












100,000
 












180,000
 










5,000,000
 












250,000
 










1,000,000
 










2,000,000
 










4,000,000
 










3,500,000
 










5,000,000
 








15,000,000
 








30,622,000
 








48,000,000
 








23,000,000
 








15,000,000


5 2 2 17 10 20 20 205 120 8 23 30 30 30 45








135,000,000


60












5,000,000


50

City

State

Program

Sacramento

CA

Amtrak

Railyards
Tunnel
/
Connec3on
to
Old
Sac

Project
Descrip3on

Funding
Required Jobs 






750,000,000
 15 










1,000,000
 15 










3,500,000
 35 








20,000,000
 75 










7,000,000
 80 








47,000,000
 150

Sacramento Sacramento Sacramento Sacramento Sacramento Sacramento

CA CA CA CA CA CA

CDBG CDBG CDBG CDBG CDBG CDBG

Tes3ng
and
Remedia3on
of
Lot
X Promenade
Phase
1 RT
DNA
Line
Minimum
Opera3ng
Segment
1 K
Street
Streetscape/
St.
Rose
of
Lima
Park/
New
Light
Rail
Stop
‐
assuming
we
could
do
two
blocks
7th‐
9th Extension
of
5th
Street
(Railyards
Blvd.
to
Richards.
Blvd.) Ramona
Street
Extension
Transporta3on

Sacramento Sacramento Sacramento Sacramento

CA CA CA CA

CDBG CDBG CDBG CDBG

Florin
Road K
Street
Street
Scape
Project 65th
Street
Sta3on
Reloca3on Army
Depot

Sacramento

CA

CDBG

Mainline
Rail
Track
Reloca3on










47,500,000


500

Sacramento

CA

CDBG

Raley
Blvd.
Magpie
Creek
Flood
Protec3on










12,500,000


1000

Sacramento

CA

CDBG

Natomas
Flood
Control
Levee
Improvements








200,000,000


3000

Sacramento

CA

Energy

1st
Phase
of
City
developing,
implemen3ng
and
installing
5MW
of
solar
power
on
12
City
buildings














850,000


100

Sacramento

CA

Housing

SHRA








500,000,000


100

Sacramento

CA

Public
Safety

Fire
sta3on
and
equipment








150,000,000


50

Sacramento

CA

Public
Safety

Police
sta3on
and
equipment








100,000,000


100

Sacramento

CA

Schools

Hiram
Walker










20,000,000


20

Sacramento

CA

Schools

Luther
Burbank










55,000,000


50

Sacramento

CA

Streets/Roads

I
Street
Bridge
Pedestrian
Loop
Improvements










10,000,000


75

Sacramento

CA

Streets/Roads

Point
West/Central
City
Transit
Solu3on










50,000,000


150

Sacramento

CA

Streets/Roads

American
River
Mul3‐use
Bridge
(Richards
to
Truxel)








100,100,000


200

Sacramento

CA

Streets/Roads

Richards
Blvd/I‐5
Interchange
Reconstruc3on

Sacramento Sacramento

CA CA

Streets/Roads Streets/Roads

Capital
City
Freeway
Improvements/Conges3on
Mi3ga3on
‐
Midtown‐Howe
Avenue Intermodal
Transit
Facility








100,000,000
 






200,000,000


250 300








100,000,000


300

Sacramento

CA

Water

Central
City
Combined
Sewer
Improvements










50,000,000


100

Sacramento

CA

Water

Reloca3on
of
Pioneer
Reservoir










80,000,000


250

Sacramento

CA

Water

Folsom
Dam
Raise
and
Early
Release
Improvements

San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino

CA CA CA CA CA CA CA CA CA CA

Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

East
Annex
Hanger
Upgrades
for
Heavy
Aircrab
Maintenance
Area
at
San
Bernardino
Interna3onal
Airport Energy
Efficiency
and
Upgrades
of
Ligh3ng
at
City
Facili3es Improvements
at
City
Parks:

two
splash
park
installa3ons,
ADA
restroom
compliance;
one
skate
park
 Parking
Lot
Sealing
and
Striping
at
City
Owned
Parking
Facili3es Roof
Restora3on,
Carpe3ng,
ADA
Restroom
Upgrades
at
Rowe
and
Villasenor
Libraries Rennova3on
of
Sturges
Center
for
the
Fine
Arts Upgrade
8ea
Series
Street
Light
Circuits New
City
Animal
Shelter
Facility Construc3on
of
New
Fire
Sta3on,
Construc3on
of
New
Fire
Fleet
Facility,
and
Repair
and
Rehabilita3on
of
 New
Community
Center
in
Verdemont








150,000,000
 










8,000,000
 












920,000
 










1,130,000
 










1,729,000
 










1,600,000
 










2,500,000
 










3,400,000
 










5,000,000
 










8,614,000


350 53 6 7 11 11 16 22 33 58

San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bernardino San
Bruno San
Bruno San
Bruno San
Bruno San
Bruno San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

CDBG Energy Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Water Water Water Water Water Housing Public
Safety Streets/Roads Transit Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

City
Hall
and
Parking
Structure
Seismic
Retrofit
and
Rennova3on Solar
Panel
Energy
Project
on
City
Hall
Parking
Structure Reloca3on
and
Construc3on
of
Administra3ve
Annex
Building
for
San
Bernardino
City
Unified
School
District
 Street
realignment,
and
construc3on
of
curbs,
gufers,
and
sidewalks
for
city
projects
on
Viaduct
Blvd.,
4th
&
 Third
Street
and
Fibh
Street
aterial
roadway,
drainage,
and
infrastructure
improvements
(from
Tippecanoe
 Mountain
View
Avenue
Bridge
Project
(Central
Avenue
south
to
I‐10),
including
reconstruc3on
and
expansion
 Local
Street
&
Public
Alley
Improvement
Projects:

street
reconstruc3on
and
repair;
bridge
repair;
ADA
 sbX
Bus
Rapid
Transit
Project
‐
Addi3onal
Funds
to
Complete
Project
and
Provide
Addi3onal
Center
Running
 Metrolink
Line
Extension
and
Plazorm
Reloca3on
to
San
Bernardino
Downtown
Transit
Center Construc3on
of
San
Bernardino
Downtown
Transit
Center Light
Rail
Service
from
San
Bernardino
to
Redlands Storm
Drain
Repairs Sewer
Line
Reloca3on
and
Rescontruc3on
for
New
State
Courthouse Sewer
Main
Replacements City
Water
U3lity
Improvements:
1
new
well,
2
reservoir
retrofits,
6
well
rehabilita3ons,
6,500
b.
of
 City
Reclama3on
Plant
Projects:
digester
gas
treatment
system;
3
new
generators;

congenera3on
system
 Grant
for
low‐
income
housholds
for
safety
improvements
and
repairs School
Resource
Officer
to
provide
DARE
and
other
drug/gang
deterrent
programs
at
Intermediate
and
 Downtown
Clean
Sidewalk
Equipment
and
Program San
Bruno
Caltrain
Grade
Separa3on
–
Gateway
Enhancements
and
Facility
Beferment
Project Pump
Sta3on
No
4
College
Replacement;
Mas3c
Ave
Main
Replacement;
N.
Water
Pump
Security;
Sneath
 40th
St.
Promenade‐Mid
City
Urban
Trails
‐
ped
&
bike
path 43rd
St.
Widening/Logan
to
I‐805
realigning
the
intersec3on 46th
Street/Maple
‐
Slope
restora3on 47th
St
&
Thorn
Street
‐
street
light
installa3on 6th
Ave
Storm
Drain
‐
replace
300
linear
b
of
CMP Asian
Pacific
Thema3c
Historic
District
Improvements Azalea
Park
Neighborhood
‐
landscape
median BAayside
Walk
&
West
MB
Drive
Traffic
Signal Birdrock
Elementary
‐
ADA
Upgrades
(sidewalks) Carroll
Canyon
Rd
‐
extend
Carroll
Canyon
Rd
from
Scranton
(under
I‐805)
to
Sorrento
Vly
Rd Central
ES
‐
sidewalks,
ped
signals Cherokee
Traffic
Calming
‐
Mid
City Community
Plan
Traffic
Mi3ga3on Condi3on
Assessment
of
Street
Network Cortez
District
Street
Lights
‐
Phase
2 Cortez
District
Street
Lights
‐
Phase
I










16,500,000
 








22,000,000
 










6,000,000
 








42,000,000
 










7,012,700
 










9,000,000
 








12,000,000
 








12,950,000
 








16,000,000
 








70,000,000
 






125,000,000
 






223,000,000
 










1,000,000
 










2,500,000
 










6,000,000
 










6,635,000
 










7,277,000
 












500,000
 












900,000
 








24,290,000
 








75,000,000
 








20,517,000
 












375,000
 










5,038,425
 












250,000
 














84,000
 












700,000
 










2,500,000
 












559,048
 












109,000
 












300,000
 








12,000,000
 












250,040
 












330,000
 












150,000
 












500,000
 










1,800,000
 










1,600,000


110 146 40 280 47 60 80 86 106 466 833 1486 7 17 40 44 48 7 14 365 1125 307










10,000,000
 










5,000,000
 








14,500,000
 








10,000,000


220 250 290 300












5,000,000


500

City

State

Program

San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Water Water Water Water Water

Project
Descrip3on Curb
ramps
at
various
loca3ons Curb
Ramps
at
various
loca3ons Dalbergia
&
Thorn
Lot
Infiltra3on Date
Street
Storm
Drain
(Kefner
to
California
Streets) Downtown
Quiet
Zone Fibh
and
Broadway
Traffic
Signal Friars/Pac
Hwy
Bike
Path Front
&
Cedar
‐
Traffic
Signal
and
Popouts Green
Street
‐
Mt
Abernathy
Drive
Infiltra3on I‐5
Bridge(s)
Street
Lights Ingulf
Place
Storm
Drain
‐
replace
36"
RCP
pipe Island
Popouts
Phase
II
and
Sidewalk
Gaps
Project Keighley
Court
Storm
Drain Kellogg
Park
Green
Lot
Infiltra3on Kensington
Manor
1
Street
Light
Circuit La
Jolla
Ecological
Rese4rve
ASBS La
Jolla
Village
Drive/I‐805
Interchange La
Jolla
Village
to
Rgents
Road
‐
Construct
a
right‐turn
lane La
Playa
Storm
Drain Lifle
Italy
District
Street
Lights Lifle
Italy
Public
Improvements
‐
PH
2
(sidewalks,
signs,
landscaping) Market
and
Ninth
Traffic
Signal Market
and
Third
Traffic
Signal
and
Popouts Market
and
Union
Traffic
Signal Memorial
Park
Infiltra3on North
Embarcadero
Visionary
Plan
Phase
I
‐
West
Broadway Otay
Truck
Rt.
Widening
PH
III Overlay
of
Various
Streets
Citywide
‐
10
miles Overlay
of
Various
Streets
Citywide
‐
35
miles Pacific
Beach
3
Street
Light
Series
Circuit
Conversion Pacific
Beach
4
Street
Light
Series
Circuit
Conversion Pacific
Beach
6
Street
Light
Series
Circuit
Conversion Pacific
Beach
7
Street
Light
Series
Circuit
Conversion Park
and
Island
Traffic
Signal Park
and
J
Traffic
Signal Park
Boulevard
&
Harbor
Drive
At‐Grade
Crossing
Improvements Potomac
Street
‐
sidewalk
improvements Ransom
&
Darwin
Storm
Drain
‐
replace
1100
linear
b
of
CMP Reconstruc3on
of
Concrete
Streets
‐
Florida
St. Reconstruc3on
of
Concrete
Streets
‐
Juan
St. Regents
Rd
Widening
from
Genesee Repair
various
concrete
streets
(Isolated
Panels)
‐
Citywide Replacement
of
Barrier
Rail
on
Barnef
Avenue
Bridge Rose
Creek
Bike
Path Rowena
Street
Storm
Drain
‐
Install
permanent
fix
line San
Fernando
to
Ventura
Walk
Repair Scripps
Ranch
Blvd
‐
Scripp
Lake
Drive
(install
raised
median) Shoal
Creek
Ped
Bridge
PH
I
‐
construct
a
ped
bridge Sidewalk
Replacement
Various
Loca3ons
city
Wide Sidewalk
Replacement
Various
Loca3ons
City
Wide
(Tree
Related) Sidewalk
replacement
Various
Loca3ons
Citywide
(Tree
related) Sidewalk
Replacement
Various
Loca3ons
Citywide
(Tree
related) Sidewalks
at
various
loca3ons Simon
Levi
Building
Sidewalks Skyline
Drive
Median
&
Parkway
Improvements Slurry
Seal
of
Variaous
Streets
Citywide
‐
100
miles Slurry
Seal
of
Various
Streets
Citywide
‐
100
miles Slurry
Seal
of
Various
Streets
Citywide
‐
25
miles SR15
Bikeway Street
Lights
in
urbanized
communi3es Sunset
Cliffs
3
Street
Lights
Series
Circuit
Conversion Talmadge
1
Street
Light
Series
Circuit
Conversion Talmadge
4
Street
Light
Series
Circuit
Conversion Thorn
Street
‐
median
improvements Traffic
Signals
at
various
loca3ons University
Ave
Front
St
‐
popouts Via
Rialto
Drive
Storm
Drain Wenrich
Drive
Storm
Drain West
Point
Loma
Blvd
Sidewalk
Improvements Willow
ES
‐
street
lights,
ped
3mers Bus
Pads Transporta3on
Mul3‐Modal
Opera3on
Center 3010
‐
Wtr
GJ
717
CI
(OB1) 3010
‐
Wtr
GJ
718A
CI
(OB2) 43rd
St.
&
Na3onal
Ave.
Realignment 43rd
St.
&
Na3onal
Ave.
Realignment 54th
Street 6300
Alvarado
Channel
Pipe
Crossing

Funding
Required Jobs 










1,000,000
 










1,500,000
 












201,590
 












371,000
 








20,000,000
 












250,000
 












450,000
 












380,000
 










1,318,288
 












800,000
 












190,000
 










1,400,000
 














57,000
 












920,000
 












300,000
 












451,331
 








21,000,000
 












735,000
 














80,000
 










1,730,000
 










1,600,000
 












240,000
 












368,000
 












240,000
 












185,250
 










7,800,000
 










2,414,000
 










5,000,000
 








17,500,000
 












800,000
 










1,000,000
 










1,000,000
 










1,000,000
 












267,000
 












267,000
 








12,900,000
 












214,000
 












542,000
 










3,200,000
 










4,500,000
 










4,000,000
 










2,200,000
 












420,000
 










3,500,000
 










1,000,000
 










2,000,000
 












730,805
 










3,500,000
 










1,200,000
 










3,500,000
 










3,000,000
 










8,500,000
 










2,352,000
 












264,000
 










1,323,027
 








10,000,000
 








11,000,000
 










2,500,000
 












175,000
 










1,092,738
 










1,000,000
 










1,000,000
 












500,000
 












276,000
 










1,000,000
 














90,000
 












800,000
 














45,000
 












251,000
 












369,000
 












500,000
 








10,000,000
 










1,308,800
 










2,100,800
 












325,456
 












532,208
 












294,341
 












451,440


City

State

Program

San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego San
Diego

CA CA CA CA CA CA CA CA

Water Water Water Water Water Water Water Water

Alvaarado
WTP
Phase
3
Rehab
Floc
Sed
Basin Buchanan
Canyon
Sewer
B
(UP) Carmel
Valley
Recycled
Waterline East
Point
Loma
TS
12/11
EPAPW Famosa
Accel
‐

Sewer
&
Water Famosa
Accel
‐
Sewer
&
Water Lake
Murray
In
Canyon
Trunk
Sewer
12/11
EP Los
Penasquitos
Recycle
Waterline

Project
Descrip3on

Funding
Required Jobs 








23,141,002
 










2,276,233
 










5,110,000
 










9,780,000
 










2,964,508
 










3,292,893
 








16,819,782


San
Diego

CA

Water

Mission
Bay
Sewage
Interceptor
System

San
Diego San
Diego

CA CA

Water Water

Mission
Center
Canyon
Sewer
B Pacific
Highway
TS
08/12
EPA












5,081,698


San
Diego

CA

Water

PS
Group
I
‐
North
County
SPS
Upgrades












4,583,600


San
Diego

CA

Water

PS
Group
II
‐
Citywide
SPS












2,936,500


San
Diego

CA

Water

Quincy
Street
&
Wilbur
Ave.












1,426,210


San
Diego

CA

Water

Sewer
&
Water
Group
716
(LJ3)
(02)














387,652


San
Diego

CA

Water

Sewer
&
Water
Group
716
(LJ3)
(02)












3,143,174


San
Diego

CA

Water

Sewer
&
Water
Group
766
(OT)














132,984


San
Diego

CA

Water

Sewer
&
Water
Group
766
(OT)












2,244,000


San
Diego

CA

Water

Sewer
&
Water
Group
772
(KE)

San
Diego

CA

Water

Sewer
&
Water
Group
772
(KE)

San
Diego San
Diego

CA CA

Water Water

Sewer
&
Water
Group
785
Canyon
(CM) Sewer
&
Water
Group
785
Canyon
(CM)

San
Diego

CA

Water

Sewer
&
Water
Group
829
(CH)














238,000


San
Diego

CA

Water

Sewer
&
Water
Group
829
(CH)














988,669


San
Diego

CA

Water

Sewer
Group
697A
(SE)

San
Diego

CA

Water

Sewer
Group
698
(BL3)
(04)












6,201,120


San
Diego

CA

Water

Sewer
Group
703
(KE1)
(03)












3,093,000


San
Diego

CA

Water

Sewer
Group
715
(LJ2)
(04)












2,720,973


San
Diego

CA

Water

Sewer
Group
725
(CA4)
(02)












1,680,172


San
Diego

CA

Water

Sewer
PS
27
Phase
II

San
Diego

CA

Water

Sunset
Cliffs
TS
07/12
EPA












4,267,157


San
Diego

CA

Water

Water
&
Sewer
Group
544
(OB101)












1,094,500


San
Diego

CA

Water

Water
&
Sewer
Group
544
(OB101)












2,055,133


San
Diego

CA

Water

Water
Group
773
(CA2)

San
Diego

CA

Water

Water
Group
790

San
Diego San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Francisco San
Gabriel San
Jose San
Jose

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Water Airport Airport CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Public
Safety Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Transit Water Water Water Water Water Streets/Roads Airport CDBG












3,570,000















198,937
 












256,200















140,784
 










2,278,140
 












580,000
 












697,095















791,267















867,000















771,000













7,094,734
 










4,246,000
 Water
Group
793
(SE) 










4,000,000
 Runway
Overlay
and
Reconstruc3on 










9,000,000
 Terminal
Seismic
Upgrades 








11,000,000
 Moscone
Conven3on
Center
Improvements
and
Expansion.
Tourism
is
San
Francisco's
largest
industry
and
the
 








30,000,000
 Hunters
Point
Shipyard/Candles3ck/Huntersview.
The
redevelopment
of
this
community
is
a
top
priority
for
 






130,000,000
 Port
of
San
Francisco
Infrastructure
projects 






200,000,000
 Transbay
Highspeed
Rail
Terminus

a
new
mul3
modal
center
will
be
the
Grand
Central
Sta3on
of
the
West
 












900,000
 San
Francisco
Energy
Efficient
Streetligh3ng
Demonstra3on
Ask: Energy
Efficiency
Small
Facili3es:
General
Fund
Department
Energy
Efficiency
Assessment
–
Small
Facili3es
Ask:
 










1,000,000
 










4,000,000
 San
Francisco
Solar
Project:

Ra3onale:
San
Francisco
has
successfully
installed
2
MW
of
solar
photovoltaic
 








10,000,000
 Energy
Efficiency
Large
Facili3es:

General
Fund
Department
Energy
Efficiency
Improvements
 








50,000,000
 Municipal
Officie
Building
Development
‐‐LEED
Pla3num
250,000
sf
12
story
building
ready
to
go 








25,000,000
 The
Bay
Area
Regional
Interoperable
Comminica3ons
System
(BayRICS)
is
a
state
of
the
art,
standards‐based
 








20,000,000
 Street
resurfacing
and
Curb
Ramps
to
address
the
$450
million
resurfacing
backlog
and
accelerater
ADA
 






100,000,000
 Doyle
Drive
Reconstruc3on.
Doyle
Drive
is
the
south
Access
to
the
Golden
Gate
Bridge
and
was
built
in
1936.

 












600,000
 Woods
Maintenance
Facility
Libs‐Replace
exis3ng
in‐ground
and
parallelogram.
Libs
are
necessary
for
the
 










2,000,000
 Automa3c
Passenger
Counters‐RailInstall
APC's
in
30%
of
the
rail
vehicles
(60
units). 










1,786,000
 Central
Control
&
Communica3ons
Facility
RehabThis
segment
of
the
project
is
to
replace
major
facility
and
 












378,000
 Central
Control
&
Communica3ons
Interim
Line
Management
Center.this
segment
of
the
project
is
to
plan,
 










1,096,000
 Central
Control
&
Communica3ons
This
segment
of
the
project
is
to
select
a
site,
design,
engineer,
and
 










2,000,000
 Drive
Cam
Installa3on
Safety
device
for
revenue
vehicles
to
record
any
unsafe
ac3on
of
the
operator.

Installs
 








26,000,000
 Neoplan
Motor
coach
Midlife
Overhaul
Overhaul
propulsion,
cooling,
brakes,
air,
doors
and
body
systems
on
 Repair
of
9
Breda
LRV's
Restore
/
rebuild
up
to
9
accident‐damaged
LRV's
to
improve
current
vehicle
availability
 








26,000,000
 Transit
Effec3veness
Project
(TEP)First
year
projects
include
major
terminal
improvements,
operator
restrooms,
 










5,000,000
 Breda
LRV
Midlife
OverhaulMaintain/improve
current
vehicle
availability
and
reduce
unscheduled
failures,
and
 






275,000,000
 








54,000,000
 SFgo
Traffic
Signal
Controllers
and
Transit
Priority
Replace
up
to
800
signal
controllers
that
are
obsolete
and
at
 










8,000,000
 Water
System
Improvement
Program
(WSIP)
Tesla
Facility;
Ra3onale:
 










8,000,000
 Civic
Center
Sustainable
District;
Sustainable
Civic
Center
Project
Ask: 








33,000,000
 New
Crystal
Springs
Bypass
Tunnel:
The
Hetch
Hetchy
Water
System
serves
2.4
million
customers
in
the
Bay
 








60,000,000
 Harding
Park:
The
San
Francisco
Public
U3li3es
Commission
(SFPUC)
Regional
Water
System
delivers
pris3ne
 










8,000,000
 Sharp
Park
Recycled
Water
:
The
San
Francisco
Public
U3li3es
Commission
(SFPUC)
Regional
Water
System
 






160,000,000
 Grade
Separa3on
for
railroad
crossings
in
San
Gabriel
CA 








50,000,000
 Airport
People
Mover 










2,000,000
 Energy
Efficiency
and
Renewable
Energy
Projects
in
Low
Income
Communi3es

25 50 600 1000 1283 1500 4 10 15 100 500 250 74 500 10 50 50 50 50 50 50 50 50 200 500 60 75 115 379 379 200 200 50

City

State

Program

San
Jose San
Jose San
Jose San
Jose San
Jose

CA CA CA CA CA

Energy Energy Energy Energy Streets/Roads

Clean
tech
Energy
Efficient
Street
Lights Fuel
Cell
Project Energy
Efficiency
and
Renewable
Energy
Proejcts‐
P3s Installa3on
of
Solar
Paneling
on
Consolidated
Rental
Car
Garage Montague
Expressway
Improvements
in
North
San
Jose

Project
Descrip3on

San
Jose

CA

Streets/Roads

Route
101/Capitol
Expressway/Yerba
Buena
Interchange
Project

San
Jose

CA

Streets/Roads

Route
101/Trimble
Interchange
Upgrade

San
Jose San
Jose San
Jose San
Jose San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Leandro San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Marcos San
Ramon San
Ramon

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Transit Transit Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water CDBG Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Energy Streets/Roads

Route
280/880
Stevens
Creek
Interchange
Updgrade Downtown
BART
sta3on
portal
in
Historic
Bank
of
America
Building San
Jose
Diridon
Transit
Sta3on
Expansion
for
BART
and
High
Speed
Rail Advanced
Recycled
Water
Treatment
Facility Chabot
Park
improvements Siempre
Verde
Park
Playground
equipment
construc3on Muir
soccer
field
Synth3c
Turf
Construc3on Citywide
ADA
Handicap
Ramp
Improvements Marina
Park
renova3on Steenzel
Park
Restroom
replacement Washinton
Manor
Park
Renova3on Toyn
Park
Improvements San
Leandro
Senior
Center
construc3on Washington
Manor
pool
construc3on Mulford
Marina
Library
Construc3on City
Center
500‐car
Garage
construc3on
 WPCP
Cogenera3on
Plant
construc3on Joint
School/City
gymnasium Dolifle
dr
and
Hesperian
boulevard
Landscape
median
improvements FAU
streets
Reconstruc3on
Project Macarthur
blvd
streetscape
improvements San
Leandro
blvd
streetscapes
improvement Davis
street
Pedestrian
over‐crossing Eden
rd
(new)
street
construc3on Street
rehabilita3on
Projects Sanitary
Sewer
Line
replacements Inflow/Infiltra3on
Improvements
of
City's
collec3on
sewer
system Replace
local
park
in
a
low‐income
neighborhood. Energy‐efficient
ligh3ng
update
in
Civic
Center
Parking
Structure.

Retrofiqng
exis3ng
HPS
lights
with
induc3on
 Installa3on
of
new
chillers
at
Civic
Center
that
would
replace
inefficient
HVAC
system
and
reduce
energy
use. A
103‐unit
green,
affordable,
mixed
use
rental
development.
The
development
will
incorporate
numerous
 Guard
rail
installa3on
on
Twin
Oaks
Valley
Road
and
on
San
Elijo
Road Twin
Oaks
Valley
Road
widening
and
improvements Drainage
improvements
along
Chinaberry
Road Fiberop3c
traffic
signal
synchroniza3on
throughout
the
City. Sprinter
(regional
transit)
mi3ga3on.

Re‐installing
a
park
near
Civic
Center
and
community
center. Barham
Drive
sidewalk
and
trail
improvements Street
rehabilita3on
projects
throughout
the
City. Valle
Vista
Affordable
Senior
Housing
Project
Solar
panel
system
and
energy
efficiency
construc3on Hooper
Drive
Widening
Project

San
Ramon San
Ramon San
Ramon San
Ramon San
Ramon San
Ramon San
Ramon Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Alcosta
Boulevard
Pavement
Resurfacing San
Ramon
Valley
Boulevard
Pavement
Resurfacing
(Phase
II) San
Ramon
Valley
Boulevard
Pavement
Resurfacing
(Phase
I) Bollinger
Canyon
Road
Pedestrian
Overcrossing Crow
Canyon
Road
Pedestrian
Overcrossing Widen
Crow
Canyon
road
from
4
to
6
lanes
from
Alcosta
Blvd.
to
East
City
Limit
Line Widen
Bollinger
Canyon
Road
from
6
to
8
lanes
from
Alcosta
Blvd.
to
Interstate
680 Segerstrom
Avenue
Rehabilita3on:
Raif
to
Fairview Civic
Center
Drive
Rehabilita3on:
French
to
San3ago Segerstrom
Avenue
Rehabilita3on:
Fairview
to
Harbor McFadden
Avenue
Rehabilita3on:
Bristol
to
Flower Segerstrom
Avenue
Rehabilita3on:
Bristol
to
Raif Residen3al
Street
Improvements:
French
Court Residen3al
Street
Improvements:
Shadow
Run McFadden
Avenue
Rehabilita3on:
Standard
to
Maple Fibh
Street
Rehabilita3on:
Fairview
Street
to
Jackson
Street

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Casa
Bonita

Santa
Ana

CA

CDBG

Santa
Ana

CA

Santa
Ana

Funding
Required Jobs 








20,000,000
 100 








12,000,000
 250 








10,000,000
 500 








10,000,000
 500 








44,000,000


250










40,000,000


250










34,000,000
 








50,000,000
 








46,000,000
 






100,000,000
 








55,000,000
 










1,000,000
 












750,000
 










1,700,000
 










1,000,000
 










1,000,000
 












500,000
 










1,400,000
 










1,500,000
 








10,000,000
 










4,500,000
 










6,300,000
 








14,000,000
 










4,600,000
 










3,000,000
 










1,000,000
 










2,500,000
 










2,000,000
 










3,000,000
 










4,000,000
 










6,000,000
 










9,000,000
 












952,000
 










2,800,000
 










1,400,000
 












500,000
 












250,000
 










1,000,000
 












700,000
 












900,000
 












600,000
 










1,400,000
 










1,000,000
 










2,000,000
 










4,000,000
 










3,000,000


250 250 500 500 500 20 20 28 30 30 30 30 35 80 100 110 120 32 60 30 30 45 45 80 100 180 20 23 35 5 5 150 20 25 30 30 45 50 50 200














200,000
 










1,500,000
 










2,389,000
 










2,911,000
 








10,000,000
 








10,000,000
 










8,996,400
 








10,581,855
 












262,000
 












730,000
 












835,000
 












880,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,400,000


10 50 80 97 300 300 300 353 10 20 20 25 25 30 30 35












1,457,000


40












1,700,000


40

Residen3al
Street
Improvements:
Saddleback
View












1,500,000


40

CDBG

Residen3al
Street
Improvements:
Willard












1,500,000


40

CA

CDBG

Residen3al
Street
Improvements:
Wilshire
Square

Santa
Ana Santa
Ana Santa
Ana Santa
Ana

CA CA CA CA

CDBG CDBG CDBG CDBG

Residen3al
Street
Improvements:
Edna
Park Residen3al
Street
Improvements:
Fairhaven Residen3al
Street
Improvements:
Lyon
Street Residen3al
Street
Improvements:
Morrison‐Eldridge
Park












1,700,000
 










1,800,000
 










2,000,000
 










2,000,000


40 50 50 50












2,300,000


60

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Windsor
Village
North












2,200,000


60

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Heninger
Park 










2,700,000


70

City

State

Program

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Bristol/Warner

Project
Descrip3on

Funding
Required 










3,300,000


Jobs 80

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Sunwood
Central

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Lacy












3,200,000


80












3,400,000


Santa
Ana

CA

CDBG

90

Residen3al
Street
Improvements:
New
Horizons












3,600,000


Santa
Ana

CA

CDBG

90












6,400,000


100

CDBG

Centennial
Park:
Rehabilita3on
of
Loop
Road
and
Parking

Lots,
construc3on
of
2
synthe3c
soccer
fields
and
 concrete
bleachers
in
complex
and
sports
ligh3ng
on
one
field Industrial
Streets
(Garnsey
Business
District)

Santa
Ana

CA












3,850,000


Santa
Ana

100

CA

CDBG

Residen3al
Street
Improvements:
Bella
Vista












4,000,000


100

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Eastside












3,900,000


100

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
French
Park












4,000,000


100

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Windsor
Village












4,300,000


110

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Pico
Lowell












4,700,000


120

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Central
City












5,000,000


130

Santa
Ana

CA

CDBG

Industrial
Streets
(area
south
of
Centennial
Park)












5,500,000


140

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Centennial
Park












5,700,000


140

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Valley
Adams












5,500,000


140

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Madison
Park












7,600,000


190

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Mid‐City










10,000,000


250

Santa
Ana

CA

CDBG

Residen3al
Street
Improvements:
Bristol
Manor










11,000,000


280

Santa
Ana

CA

CDBG

Bristol
Phase
I
(Pine
to
Mc
Fadden)

Santa
Ana Santa
Ana Santa
Ana Santa
Ana Santa
Ana

CA CA CA CA CA

CDBG Energy Energy Public
Safety Public
Safety

First
Street
Bridge
Replacement
at
the
Santa
Ana
River Solar
systems
for
two
City
buildings.

Installa3on
is
expected
to
begin
in
early
2009
and
will
be
completed
by
 Energy
efficiency
improvements
to
city
buildings,
including
ligh3ng,
HVAC,
and
system
controls.
The
scope
is
 School
Resource
Officers
for
all
Junior
High
and
High
Schools Neighborhood
Police
Community
Oriented
Policing/Problem
Oriented
Teams










13,700,000
 








20,000,000
 










2,625,555
 










4,508,885
 












500,000


400 500 66 113 20

Santa
Ana

CA

Transit

Regional
Transporta3on
Center
Improvements
(ADA
upgrades,
façade
improvements,
fire
protec3on,
alarms)

Santa
Ana

CA

Water

Bristol
Phase
I‐
MWD
Water
Improvements

Santa
Ana Santa
Ana Santa
Barbara Santa
Barbara

CA CA CA CA

Water Water Airport Airport

Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

S‐1
Storm
Drain R‐1
Storm
Drain Airline
Terminal
Improvement
Project
‐
Construc3on
of
a
67,000
square
foot
two‐story
airline
terminal
facility,
 Airport
Sewer
System
‐
To
construct
a
perimeter
wastewater
collec3on
system
for
the
area
south
of
Hollister
 Avenue.

Construct
a
lib
sta3on
and
force
main
from
new
lib
sta3on
to
Goleta
Sanitary
District
trunk
line
in
 Fairview
Avenue
in
accordance
wit Airport
Water
System
Improvement
Project
‐
To
construct
a
looped
network
system
to
supply
domes3c
and
fire
 
Marina
One
Replacement
Project
‐
Phase's
1,2,3
 
Mission
Creek
Steelhead
Passage
at
Oak
Park.

The
purpose
of
this
project
is
to
restore
Mission
Creek
in
Oak
 Stearns
Wharf
&
City
Pier
Pile
Driving
Project
 Alameda
Park
Gazebo
‐

A
historic
gazebo
in
one
of
Santa
Barbara's
oldest
parks,
the
project
includes
the
 Cabrillo
Bathhouse
Restroom
Renova3on
‐

Located
within
the
City's
oldest
beach
front
facility,
the
project
 Carrillo
Gym
Spalling
Repair
‐

A
"Structure
of
Merit"
the
project
includes
the
repair
of
the
concrete
gym
walls. Catch
Basin
Debris
Screens
‐
The
purpose
of
this
project
is
to
install
catch
basin
debris
screens
in
various
areas
 Chase
Palm
Park
Renova3on
‐

The
project
includes
replacement
and
repair
of
park
ligh3ng,
walkways,
 City
Infrastucture
Storm
Water
Quality
Improvement
Retrofit
Project
‐
The
purpose
of
the
project
is
to
 Fire
Sta3on
Infrastructure
Upgrades
(retrofit
exisi3ng
ligh3ng
fixtures,
HVAC
systems
and
roofs
targe3ng
 Franklin
Community
Center
Kitchen
Renova3on
&
Equipment Harbor
Breakwater
Cap
Repair
Project
 Main
Library
Roof
Replacement
(with
cool
roof
system
targe3ng
energy
conserva3on) Oak
Park
Restroom
Renova3on
‐
The
renova3on
project
includes
new
fixtures,
par33ons,
flooring,
ligh3ng
and
 Park
&
Recrea3on
Facility
Retrofits
&
Maintenance

(Inlcludes
public
facili3es
such
as
recrea3on,
senior,
arts
 Playground
Replacement
for
Sunflower
Park
and
Eastside
Park
‐

Playgrounds
to
be
replaced
to
comply
with
 Police
Department
Infrastructure
Upgrade
(Retrofit
exis3ng
fluorescent
fixtures,
HVAC
systems,
and
windows
 Police
Department
Remodel
Polygraph
Room
(remove
asbestos,
paint
walls,
replace
ceiling,
carpet
and
 Public
Works
Corporate
Yard
and
Administra3on
Offices
(Remove
asphalt,
repair
failed
basecourse,
modify
 Rebuild
Municipal
Tennis
Stadium Replace
Library
Fire
and
Intrusion
Alarms
(two
libraries) Replace
windows
and
repair
damaged
wood
at
Las
Positas
Tennis
Facility Resurface
Parks
&
Recrea3on
Facili3es
parking
lots San
Pascual
Storm
Drain
Diversion
‐

The
purpose
of
the
project
is
to
improve
water
quality
within
Old
Mission
 Security
Cameras
at
two
City
Parks Shoreline
Park
Renova3on
Project
‐

A
popular
community
bluff
top
parks,
the
project
includes
renova3on
of
 Sidewalk,
curb
and
gufer
infill
projects
‐
various
loca3ons
throughout
the
City.
 Sunflower
Park
Landscape
Renova3on

Santa
Barbara

CA

CDBG

Upgrades
and
repair
for
the
Ortega
Park
Restroom


Santa
Barbara

CA

CDBG

Santa
Barbara

CA

Streets/Roads

Upper
Las
Positas
Creek
Restora3on
and
Storm
Water
Management
Project.

The
project
has
two
primary
 objec3ves:
1)
to
construct
storm
water
deten3on
system
(bioswales
and
deten3on
ponds)
to
reduce
flood
 flows
and
improve
water
quality
in
Las
Positas
Creek. Access
Ramps

Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara

CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Bridges Overlay
(Rubber
AC) Overlays Sidewalk
Infill Sidewalk
Replacement












1,300,000


60












4,600,000


150












1,300,000
 








10,500,000
 








31,200,000
 








45,000,000


30 300 870












4,800,000
 










1,360,000
 










4,300,000
 












800,000
 












185,000
 












200,000
 












100,000
 












500,000
 










1,100,000
 












870,000
 












800,000
 














95,000
 












150,000
 












800,000
 












350,000
 












250,000
 












588,000
 












295,000
 












153,000
 














25,000
 












280,000
 










1,000,000
 












420,000
 














80,000
 












655,000
 












300,000
 














60,000
 












500,000
 










1,075,000
 














21,000
 












325,000













1,200,000
 










1,000,000
 










9,639,800
 










5,000,000
 










8,000,000
 










1,500,000
 










1,300,000


City

State

Program

Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Barbara Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Cruz Santa
Monica Santa
Monica

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Housing Housing Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Santa
Monica

CA

Streets/Roads

Santa
Monica

CA

Streets/Roads

Santa
Rosa

CA

CDBG

Storm
Drain Streetlight
Improvements Aera3on
Basin
Diffusers Energency
Generators Equiliza3on
Basin Headworks
Screening Lib
sta3on
rehab Reservoir
Projects Sewer
Rehabilitaion Sewer
Replacement Water
Distribu3on
System Water
Mains Water
Treatment Monterey
Bay
na3onal
Marine
Santuary
Visitor
Center Tannery
Arts
Center
Working
Studios Downtown
Streetlight
Replacement Soquel
Streetlight
Replacement San
Lorenzo
River
Trestle
Bridge
Connec3on Soquel
and
Pine
Storm
Drain
Water/Sewer San
Lorenzo
River
Mul3
Purpose
path
under
Highway
1 Phase
1
street
pavement
Rehabilita3on Phase
2
street
pavement
rehabilita3on Upgrade
stringers
and
deck
boards
on
the
Newcomb
Deck,
adjoining
the
Santa
Monica
Pier,
to
support
vehicles
 Replace
101
light
poles
and
16,000
b
of
LED
lights
on
the
Santa
Monica
Pier
to
provide
more
efficient
light
and
 to
replace
fixtures
and
poles
damaged
by
the
marine
environment.
 U3li3es
on
the
Santa
Monica
Pier
need
to
be
upgraded
to
repair
fire
sprinklers
and
install
a
new
standpipe
for
 fire
safety,
replace
frozen
water
valves,
and
replace
worn
u3li3es
line
hangars
and
water,
sewer
and
gas
pipes.
 Replace
78
wood
piles
in
the
water
suppor3ng
the
Santa
Monica
Pier
with
concrete,
cast‐in‐place
concrete
 piles
and
caps.
 ADA
Compliance

Project
Descrip3on

Santa
Rosa Santa
Rosa Santa
Rosa

CA CA CA

Energy Energy Public
Safety

biomass
to
fuel
project solar
installa3on school
resource
officers

Santa
Rosa

CA

Public
Safety

interoperability
project

Santa
Rosa Santa
Rosa Santa
Rosa

CA CA CA

Streets/Roads Streets/Roads Streets/Roads

6th
St.
Undercrossing Bicentenni3al
Turn
Lanes Mendocino
Avenue
Adap3ve
Traffic
Control
Project

Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa

CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Spring
Street
Sewer

&
Water
Improvements College
Avenue
widening
and
Class
2
Bike
Lanes Hearn
Avenue
Widening Stony
Point
Road
Widening
&
Reconstruc3on

Hwy
12
to
Sebastopol
Road Overlay
Project Bike
and
Ped
Path

Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa Santa
Rosa

CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Transit Transit Transit Transit Transit Transit Transit Water Water Water

farmers
lane
extension Farebox
Modifica3ons Rapid
Bus
Corridor transit
mall
improvements Transit
Opera3ons
‐Restore
State
Funding
loss Transit
"Green"
Retrofit Technology
upgrade hybrid
bus
purchase‐‐13 reclaimed
water
pilot
program seismic
upgrade
of
water
facili3es sewer
and
water
replacement

Santa
Rosa

CA

Water

discharge
compliance
project

Santa
Rosa Santa
Rosa Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley

CA CA CA CA CA CA CA CA CA

Water Water CDBG CDBG Energy Energy Energy Energy Energy

Simi
Valley Simi
Valley

CA CA

Energy Public
Safety

geysers
pipeline
project various
sewer/water
replacement Purchase
and
renova3on
or
construc3on
of
a
20,000
square
foot
mul3‐disciplinary
building
to
house
social
 Expansion
of
City
Hall Installa3on
of
energy
efficient
HVAC
systems,
indoor
lights,
and
outdoor
ligh3ng
at
City‐owned
public
buildings U3lize
solar
power
to
offset
electricity
usage
at
the
City’s
sewage
treatment
plant
and
dewatering
wells Retrofit
amber
light
traffic
signals
with
energy
efficient,
LED
lamps
(1,500
units) Retrofit
street
name
signs
with
solar/LED
ligh3ng
(120
intersec3ons) Development
of
facility
that
uses
digester
gas
generated
at
the
City’s
wastewater
treatment
plant
to
generate
 electricity Rebates
to
homeowners
of
buildings
constructed
prior
to
1975
to
par3ally
offset
the
cost
of
weather‐stripping,
 Development
of
an
on‐line
system
for
the
submission
of
police
reports
by
the
public

Simi
Valley

CA

Public
Safety

Upgrade
of
mobile
computer
units
in
Police
vehicles
to
include
improved
func3onality

Simi
Valley

CA

Public
Safety

Offsite
backup
of
the
Police
Department’s
Integrated
Police
Systems
for
disaster
recovery
purposes

Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley

CA CA CA CA CA CA CA CA

Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Purchase
and
installa3on
of
a
Citywide
Reverse
911
system Replacement
of
the
City’s
outdated
telephone
system Minor
Street
Rehabilita3on
‐
Two
ramps
at
the
intersec3on
of
Royal
Ave.
and
Acadia
St. Minor
Street
Rehabilita3on
‐
Azure
Ct. Minor
Street
Rehabilita3on
‐
Crack
filling
of
various
major
streets Major
Street
Rehabilita3on
‐
Repair
of
pavement
ruqng
at
Sycamore
Dr.
and
Los
Angeles
Ave. Minor
Street
Rehabilita3on
‐
Azure
Ct.
and
Azure
Hills
Dr.
area Minor
Street
Rehabilita3on
‐
Stonebrook
St.,
west
of
Longbranch
Rd.

Funding
Required Jobs 












700,000
 










6,500,000
 












200,000
 












200,000
 












250,000
 










4,500,000
 












180,936
 












175,000
 












500,000
 












925,000
 












195,000
 










4,587,500
 














60,000
 










9,600,000
 135 








10,000,000
 141 












250,000
 4 












500,000
 7 












700,000
 10 












750,000
 11 










1,000,000
 14 










2,000,000
 28 










2,000,000
 28 










6,875,000
 10 










1,850,000


12














750,000


12












5,000,000


20












2,000,000
 














75,000
 










1,000,000


15 5 10














550,000


5












1,000,000
 










1,100,000
 












750,000


8 10 10














750,000
 










2,000,000
 










1,100,000
 










1,400,000
 










3,000,000
 










6,200,000


10 15 17 25 35 41












4,500,000
 








40,000,000
 












800,000
 












850,000
 










1,000,000
 










2,400,000
 










2,300,000
 










3,000,000
 










8,450,000
 










2,000,000
 










2,250,000


45 264 12 12 15 16 18 23 38 13 15












3,000,000


20












5,000,000
 










5,000,000
 










8,500,000
 








11,000,000
 








33,000,000
 












900,000
 












150,000
 












225,000
 










2,400,000


33 33 54 50 175 10 10 20 20












1,250,000
 










2,000,000


30 100














100,000


1














300,000


3












1,200,000
 










1,400,000
 










1,200,000
 















6,800
 














25,000
 














75,000
 












150,000
 












150,000
 












150,000


5 5 5 0.07 0.25 0.75 1.5 1.5 1.5

City

State

Program

Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley Simi
Valley

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Water Water

Minor
Street
Rehabilita3on
‐
West
Cochran
St.,
west
of
Park
Center
Dr. Minor
Street
Rehabilita3on
‐
Sequoia
Ave.
(Presidio
Dr.)
north
of
Township
Ave. Minor
Street
Rehabilita3on
‐
Stonebrook
St.
between
Sinaloa
Rd.
and
First
St. Major
Street
Rehabilita3on
‐
Erringer
Rd.
(Fitzgerald
Rd.
to
south
end) Major
Street
Rehabilita3on
‐
Fitzgerald
Rd.
(Sequoia
Ave.
to
Appleton
Rd.) Replacement
of
deteriorated
curbs,
gufers,
and
sidewalks
in
older
areas
of
the
City Major
Street
Rehabilita3on
‐
Madera
Rd.
(Streathearn
Pl.
to
200'
south
of
Royal
Ave.) Enhanced
slopes
below
118
Freeway
overpasses
at
Madera
Rd.,
Erringer
Rd.,
Eycamore
Dr.,
Galena
Ave.,
 Major
Street
Rehabilita3on
‐
Cochran
St.
(Sycamore
Dr.
to
Erringer
Rd.) Construc3on
of
undercrossings
where
arterial
streets
intersect
a
flood
control
channel
to
allow
for
pedestrian
 Bus
stop
enuncia3on
system
for
fixed
route
buses Three
Dial‐A‐Ride/Paratransit
vans Moderniza3on
of
transit
center
garage Replace/upgrade
deteriorated
transit
shelters Replacement
of
four
fixed‐route
CNG
buses Groundwater
basin
well
and
collector
line Water
main
replacements

Project
Descrip3on

Simi
Valley

CA

Water

Recycled
water
projects

Simi
Valley Simi
Valley Stockton Stockton Stockton Stockton

CA CA CA CA CA CA

Water Water Energy Energy Energy Streets/Roads

Construc3on
of
bank
stabiliza3on
improvements
downstream
of
the
City’s
wastewater
treatment
plant. Replacement
of
corroded
trunk
sewer
lines
at
seven
loca3ons HVAC
replacement
program
‐
replacement
of
an3quated
HVAC
equipment
in
various
City
building
with
more
 Roof
replacement/repair
of
city
buildings
‐
replacement
of
aged
roofs
of
city
buildings
to
preserve
building
 1mW
Solar
Photovoltaic
System
‐
Installa3on
of
1
megawaf
of
solar
photovoltaic
panels
at
City
owned
facili3es
 California
Street
Improvements
(120
days)

Stockton

CA

Streets/Roads

Curb,
gufer,
sidewalk
and
wheelchair
ramp
program
(120
days)

Stockton

CA

Streets/Roads

Duck
Creek
Bicycle
Path
Gap
Closure
(120
days)

Stockton

CA

Streets/Roads

Stockton

CA

Stockton

Funding
Required 












150,000
 












200,000
 












280,000
 












600,000
 










1,000,000
 












300,000
 










1,400,000
 










2,000,000
 










2,000,000
 










3,200,000
 














74,000
 












283,500
 












800,000
 












720,000
 










1,672,000
 










1,500,000


Jobs 1.5 2 2.8 6 10 10 14 20 20 75 10 20 30 40 40 10












1,000,000


20










15,000,000
 








14,000,000
 










8,000,000
 










2,500,000
 










3,000,000
 










8,500,000


30 50 70 95 114 324














500,000


100












1,500,000


100














150,000


100

Neighborhood
traffic
calming
program
(120
days)












1,000,000


100

Streets/Roads

Sufer
Street

Pedestrian
&
Bicycle
Bridge
Project
(180
days)












1,400,000


100

CA

Streets/Roads

Traffic
Signal
Installa3ons
‐
5
loca3ons
(120
days)













2,500,000


100

Stockton

CA

Streets/Roads

Trinity
Bridge
Extension
(180
days)














300,000


100

Stockton

CA

Streets/Roads

Weston
Ranch
Fiber
Op3c
Network‐
(traffic
signal
control
system)
(120
days)












1,200,000


100

Stockton

CA

Streets/Roads

Wilson
Way
Corridor
Adap3ve
Traffic
Control
System
(120
days)

Stockton Stockton Stockton Stockton Stockton Stockton Stockton Stockton

CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

ADA
Pedestrian
Crossing
Enhancements
(120
days) El
Dorado
Street
&
Center
Overpasses
Rehabilita3on
(120
days) Traffic
Signal
Controller
Upgrades
‐
Citywide
(120
days) Weber
Avenue
Streetscape
Beau3fica3on
Project
‐
Phase
2
(180
days) Airport
Way
Streetscape
Beau3fica3on
‐
Phase
2
(tenth
street
to
carpenter
‐
180
days) Bridge
Preventa3ve
Maintenance
(citywide
365
days) El
Dorado
Street
Widening
(365) Hammer
Lane
Phase
IIIB
(120
Days)












1,800,000
 










4,000,000
 










3,000,000
 










3,000,000
 










2,800,000
 










4,600,000
 










6,200,000
 










3,600,000


100 200 200 200 200 300 300 400












5,000,000


400

Stockton

CA

Streets/Roads

Street
Repair
Maintenance
Program
‐
Citywide
(120
days)












8,800,000


500

Stockton

CA

Streets/Roads

Thornton
Road
Widening
(120
Days)

Stockton Stockton Stockton Stockton Stockton Stockton

CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water

600 2300 2300 3000 3900 5200

Sunnyvale Sunnyvale

CA CA

CDBG Energy

Arch
Sperry
Road
Extension
(365
days) French
Camp
Rd/I‐5
Interchange
(365
days) North
Stockton
1‐5
Auxillary
Lanes
(
365
days) North
Stockton
Railroad

Grade
Separa3ons
&
Bridge
Replacements
(365
days) North
Stockton
1‐5
Mainline
Widening
(365
days) Delta
Water
Supply
Project
will
include
the
construc3on
of
an
intake
facility
and
pump
sta3on,
11
miles
of
new
 pipeline
to
convey
the
delta
water
to
a
new
water
treatment
plan. Columbia
Neighborhood
Center
‐
3500
square
foot
expansion
of
exis3ng
neighborhood
services
center
that
 Building
Op3miza3on












8,500,000
 








20,000,000
 








24,405,000
 








78,000,000
 








73,000,000
 






134,000,000
 






200,000,000
 










1,000,000


170 10

Sunnyvale Sunnyvale

CA CA

Energy Energy

Install
Photovotaic
Systems
at
City
Facili3es Replace
4
exis3ng
sedans
with
Hybrids
















81,000
 










3,094,000


1 1

Sunnyvale

CA

Energy

Replace
High
Pressure
Sodium
street
lights
with
LED's

Sunnyvale

CA

Public
Safety

BYRNE‐
Provide
TASER,
Less
Than
Lethal
Force,
Technology
to
all
patrol
officers

Sunnyvale

CA

Public
Safety

BYRNE‐Computer
aided
dispatch
(CAD)
technology
for
Public
Safety
Fire
Apparatus.
Mobile
computer
terminals
 hardware
and
sobware
to
facilitate
communica3ons
interoperability
for
Public
Safety
first
responders.

Sunnyvale Sunnyvale Sunnyvale

CA CA CA

Public
Safety Streets/Roads Streets/Roads

Sunnyvale

CA

Streets/Roads

Sunnyvale

CA

Transit

Sunnyvale

CA

Transit

Sunnyvale

CA

Water

BYRNE‐License
Plate
Reader
(LPR)Technology,
purchase
and
installa3on
of
LPR
scanners
for
vehicle
and
 Caribbean
Drive
Bridge
‐
Rehabilitate
bridge,
replace
damaged
guard‐rails,
and
repair
bridge
deck. Wolfe
Road
Bridge
‐
Rehabilitate
bridge
with
failed
bearing
pads.

Replace
bearing
pads,
patch,
and
correct
 deficiencies Mathilda
Overhead
Bridge
‐
Rehabilitate
a
bridge
rated
"func3onally
obsolete"
to
rebuild
off‐ramp,
correct
on‐ ramp,
pedestrian
access,
and
correct
other
deficiencies. Expand
parking
for
train
users.

Creates
addi3onal
parking
near
the
Downtown
Sunnyvale
CalTrain
sta3on,
to
 alleviate
parking
shortage. Murphy
Ave.
Streetscape
‐
Provide
befer
pedestrian
access
and
ameni3es
connec3ng
business
district
with
 mul3‐modal
transit
hub. Sanitary
Sewer
Replacement
‐
Replace
approx.
13,000
feet
of
sewer
pipe
in
poor
condi3on.

Sunnyvale Sufer
Creek

CA CA

Water CDBG

Water
Main
Replacement
‐
Replace
cast
iron
water
mains
at
the
end
of
their
service
life
with
C900
Class
200
 Sufer
Creek
Infrastructure
West
Ridge
Extension
Project

Sufer
Creek Sufer
Creek

CA CA

Energy Energy

Sufer
Creek
Municipal
Facility
Solar
Project Sufer
Creek
Swimming
Pool
Solar
Project

Sufer
Creek

CA

Energy

Sufer
Creek
Sewer
Plant
Solar
Project

Sufer
Creek

CA

Public
Safety

COPS
hiring
















39,600


1












8,378,750


1














200,000


0














400,000
 












108,000
 










1,000,000


0 0 1












3,000,000


3










35,000,000


10














400,000


1












5,400,000


3












3,400,000
 










3,000,000


1 1












5,000,000
 












500,000


40 2














500,000


2












1,300,000
 












100,000


5 1

City

State

Program

Sufer
Creek

CA

Streets/Roads

Gopher
Flat
Road
Reconstruc3on

Project
Descrip3on

Funding
Required 










2,150,000


Jobs 20

Sufer
Creek

CA

Streets/Roads

Sufer
Creek

CA

Water

Citywide
Street
Reconstruc3on












2,100,000


24

Sufer
Creek/Amador
Regional
Sanita3on
Authority
Poplar
Planta3on
Spray
Irriga3on
Project












1,200,000


Sufer
Creek

CA

2

Water

Sufer
Creek
Recycle
Water
Storage
Project

CA CA CA CA

Water Water Water Water

Sufer
Creek/Amador
Regional
Sanita3on
Authority
Goffinefe
Reservoir
Acquisi3on
and
Conversion
to
 Sufer
Creek/Amador
Regional
Sanita3on
Authority
Henderson
Reservoir
Rehabilita3on Sufer
Creek/Amador
Regional
Sanita3on
Authority
pipeline
project Sufer
Creek/Amador
Regional
Wastewater
Plant












4,000,000
 










4,500,000
 










5,000,000
 










5,000,000


Sufer
Creek Sufer
Creek Sufer
Creek Sufer
Creek

4 4 4 4










17,000,000


10

Sufer
Creek

CA

Water

Sufer
Hill
East
Sewer
and
Storm
Drain
Improvements














600,000


10

Temecula

CA

CDBG

Neighborhood
Gym












1,400,000


40

Temecula

CA

Streets/Roads

Temecula Temecula Temecula Temecula Temecula Temecula Temecula Temecula Temecula Temecula Temecula Torrance Torrance Tracy Tracy Tracy Tracy Tracy Tracy Tracy Tracy

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water Water Water Public
Safety Public
Safety Public
Safety Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Storm
Drain
Culvert
repair.
Two
loca3ons,
Rancho
California
Road
and
Old
Town
Front
Street.
Total
cost
 $920,000.

Both
projects
are
replacing
aging
storm
drain
systems
that
are
beginning
to
create
safety
concerns. Street
Reconstruc3on,
Jehediah
Smith,
Complete
rebuild Pavement
Maintenance
/
Slurry
Seal
City
Streets
in
need
of
maintenance.
Total
cost
$1,200,000. Rancho
California
Road
Storm
Drain
Repair Winchester
Road
(SR
79N)
median
improvements,
irriga3on,
and
landscape
Project.

Total
Project
cost
$3.4
 Main
Street
Bridge
Replacement.
This
project
will
replace
a
damaged
wood
and
concrete
bridge
over
Murrieta
 Murrieta
Creek
Bridge
and
Western
by‐pass
extension.
This
project
will
construct
a
new
four
lane
bridge
 Murrieta
Creek
Bridge
and
Overland
Drive
Bridge.
This
project
will
construct
a
new
four
lane
bridge
serving
the
 Buferfield
Stage
Road
Gap
Closure
Project. Highway
79S
Park
&
Ride San3ago
Deten3on
Basin.This
is
a
flood
control
project
that
also
stabilizes
a
highly
erosive
creek
bed.
Total
cost
 Murrieta
Creek
Flood
Control,
Environmental
Restora3on,
Recrea3on
Project City
Yard
Water
Quality
Improvement
Project T‐1
Vault
Upgrades Playground
Renova3on
Project,
CIPs
7891
&
7897 Clean
up
of
the
Downtown
Bow3e
Area Fire
Sta3on
97 Chrisman
Road
property
wastewater
line
extension
CIP
7469 Old
Schulte
Rod
‐
Corral
Hollow
Rd.
to
city
limits,
CIP
73B6 Corral
Hollow
Rd.
widening
between
Grant
Line
Rd.
and
West
Valley
Mall
Entry,
CIP
7314 Bessie
Ave.
reconstruc3on,
CIP
73A1 Corral
Hollow
Rd.
widening
between
Old
Schulte
Rd.
and
Grant
Line
Rd.,
CIPs
7382
&
7383














866,000
 












300,000
 










1,200,000
 












350,000
 










2,275,000
 










7,000,000
 










7,300,000
 








10,400,000
 








27,000,000
 










1,300,000
 












845,000
 










7,500,000
 












350,000
 












400,000
 










2,000,000
 










8,000,000
 










7,200,000
 










2,000,000
 










1,000,000
 










3,600,000
 










4,800,000


10 10 15 15 40 75 80 130 250 50 10 150 10 10 30 40 85 30 10 25 30

Tracy Tracy Tracy Tracy Tracy Tracy Turlock Turlock

CA CA CA CA CA CA CA CA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Streets/Roads Streets/Roads












7,500,000
 








11,000,000
 








12,000,000
 














11,000
 










7,300,000
 










1,000,000
 








14,500,000
 














75,000


45 55 60 70 70 15 75 5

Turlock Turlock

CA CA

Streets/Roads Streets/Roads














500,000
 












573,000


26 31














650,000


34

Turlock

CA

Streets/Roads














671,000


36

Turlock

CA

Streets/Roads














696,000


36

Turlock

CA

Streets/Roads














750,000


39

Turlock

CA

Streets/Roads














750,000


39

Turlock

CA

Streets/Roads














750,000


39

Turlock

CA

Streets/Roads














750,000


39

Turlock

CA

Streets/Roads

Turlock Turlock

CA CA

Streets/Roads Streets/Roads














725,000
 












950,000


39 49












1,057,000


55

Turlock

CA

Streets/Roads












1,094,000


57

Turlock

CA

Streets/Roads












1,126,000


60

Turlock

CA

Streets/Roads












1,307,000


68

Turlock

CA

Streets/Roads












1,523,000


81

Turlock

CA

Streets/Roads












1,800,000


94

Turlock

CA

Streets/Roads












6,000,000


315

Widening
of
Eleventh
St.
between
Lammers
Rd.
and
Highway
I‐205 Widening
of
Lammers
Rd.
south
of
Eleventh
St.,
CIP
7393 Grant
Line
Road
Reconstruc3on
between
Parker
Ave.,
to
MacArthur
Dr.,
CIP
7352 Overlay
and
reconstruc3on
of
sidewalk
on
various
city
streets,
CIP
73B1 Paferson
Pass
Water
Booster
Pump
Sta3on
replacement,
CIP
7597 Wastewater
Effluent
Cooling
and
Habitat
Enhancement
Project Sidewalk
Hawkeye
Ave.
Geer
Rd
to
Donnelly
Park
Dr Project:
High
Street
Roadway
Improvements
from
Lander
Avenue
to
West
Avenue
South Project
Descrip3on:
The
project
would
provide
a
2”
asphalt
overly
to
High
Street.
In
addi3on,
all
exis3ng
 pedestrian
routes
will
be
improved
to
meet
ADA
standards. Pedras
Rd.
Pavement
Overlay/Resurface:
Geer
Rd.
to
Del's
Ln.
Rehabilita3on Golden
State
Blvd
and
"F"
St.
Intersec3on
Improvement:
Install
traffic
signal Intelligent
Transporta3on
System E.
Hawleye
Ave.Pavement
Overlay/Resurface:
Quincy
Rd.
to
Palmer
Dr. Rehabilita3on N.
Olive
Ave.
Pavement
Overlay/Resurface:
Monte
Vista
Ave.
to
Fullerton Rehabilita3on Cristoffersen
Parkway
and
Fosburg
Rd.
Intersec3on
Improvements:
install
traffic
signal Intelligent
Transporta3on
System
 Golden
State
Blvd.
and
Pedras
Rd.
Intersec3on
Improvements:
install
traffic
signal Intelligent
Transporta3on
System
 Hawkeye
Ave.
and
Denair
St.
Intersec3on
Improvements:
install
traffic
signal Intelligent
Transporta3on
System
 W.
Main
St.
and
Tegner
Rd.
Intersec3on
Improvements:
install
traffic
signal Intelligent
Transporta3on
System
 W.
Main
St.
Pavement
Overlay/Resurface:
Lander
Ave.
to
West
Ave.
South Rehabilita3on Handicapped
Wheelchair
Ramps
250
Loca3ons Golden
State
Blvd.
Pavement
Overlay/Resurface:
Fulkerth
Rd.
to
Tuolumne
Rd. Rehabilita3on Geer
Rd.
Pavement
Overlay/Resurface:
Monte
Vista
Ave.
to
Taylor
Rd. Rehabilita3on Fulkerth
Rd.
Pavement
Overlay/Resurface:
Tully
Rd.
to
N.
Golden
State
Blvd. Rehabilita3on
 Golden
State
Blvd
Pavement
Overlay/Resurface:
Crane
St.
to
South
city
limits Rehabilita3on W.
Monte
Vista
Ave.Pavement
Overlay/Resurface:
Crowell
Rd.
to
Geer
Rd. Rehabilita3on
 Project:
Construc3on
of
off‐site
improvements
for
Public
Safety
Center
in
the
downtown.
 Project
Descrip3on:
The
off‐site
improvements
are
necessary
to
serve
the
new
58,000
square
foot
public
safety
 building
in
downtown
Turlock. PSR\PSE
and
Construc3on,
Fulkerth
Rd.
and
99
Freeway
Interchange
Upgrade.
Modifica3on
of
the
exis3ng
 interchange
to
meet
traffic
demands

City

State

Program

Turlock

CA

Transit

Turlock

CA

Water

Turlock

CA

Water

Ventura

CA

Energy

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Streets/Roads

Ventura

CA

Water

Ventura

CA

Water

Ventura

CA

Water

Ventura

CA

Water

Ventura

CA

Water

Ventura

CA

Water

Visalia Visalia Visalia Visalia Visalia Visalia

CA CA CA CA CA CA

Airport Airport Airport Airport Airport Airport

Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Airport Airport Airport Amtrak CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy

Project
Descrip3on Land
acquisi3on
for
transit
hub. The
City
of
Turlock
currently
provides
a
fixed
route
transit
system
to
its
ci3zens.
In
addi3on,
Turlock
is
served
by
 Stanislaus
and
Merced
County
Transit
Systems.
Currently,
these
three
transit
system
have
no
single
lo Project:
Wastewater
Ouzall
Line
(Harding
Drain
Bypass) Project
Descrip3on:
This
project
will
install
approximately
6
miles
of
pipeline
from
the
current
point
of
 discharge
into
the
Harding
Drain
to
the
San
Joaquin
River.
This
pipeline
serves
the
en3re
 Project:
Turlock
Regional
Water
Quality
Control
Facility
Expansion Project
Descrip3on:

The
project
will
make
improvements
to
the
RWQCF
to
expand
treatment
capacity
and
 enhance
water
quality
(nitrates),
solids
handling,
and
the
removal
of
organics. Energy
Efficiency
and
Photovoltaic
Systems
‐Install
photovoltaic
panels
at
City
Hall
and/or
San
Jon
Yard
that
will
 provide
up
to
100%
of
electricity
needs.

Solar
photovoltaic
panels
at
City
Hall
would
range
between
a
500
KW
 and
600
KW
system.

 Street
Resurfacing
‐
Sperry
Avenue
‐
includes
resurfacing
Sperry
Ave
from
Valen3ne
Rd
to
Colt
Street,
cold
 milling,
pavement
repairs,
manhole
and
valve
adjustments
to
grade,
street
name
signs,
striping,
replacement
 of
traffic
induc3ve
loops,
and
130,200 Foothill/Kimball
Road
Traffic
Signal
‐
Construc3on
includes
a
new
traffic
signal
for
intersec3on
of
Foothill
Road
 and
Kimball.
This
project
will
include
the
installa3n
of
sidewalk,
curb
ramps,
and
minor
drainage
improvements
 at
the
intersec3on. Street
Resurfacing
‐
Poli
and
Foothill
from
Seaward
to
Hospital.

The
project
consists
of
overlaying
approx.
 150,000
sq.
feet
of
deteriorated
roadway
with
new
asphalt.
The
project
includes
cold
milling,
pavement
 repairs,
manhole,
and
valve
adjustments
 Street
Resurfacing
‐
Olive
Street
project
includes
resurfacing
Olive
Street,
cold
milling,
pavement
repairs,
 manhole
and
valve
adjustments
to
grade,
street
name
signs,
striping,
replacement
of
traffic
induc3ve
loops,
 and
277,000
square
feet
of
asphalt. Street
Slurry
Seals
‐
The
project
provides
proac3ve
maintenance
by
slurry
sealing
city
streets
to
prolong
the
life
 of
asphalt
streets.
The
project
includes
crack
sealing
and
restriping
the
pavement.
 Street
Resurfacing
‐
Telegraph
Road
‐
The
project
includes
cold
milling,
pavement
repairs,
manhole
and
valve
 adjustments
to
grade,
street
name
signs,
striping,
replacement
of
traffic
induc3ve
loops
&
498,000
sq.
b
of
 asphalt
overlay. Street
Resurfacing
‐
Telephone
Road
From
Wells
to
Kimball
Overlaying
approx.
932,000
square
feet
of
asphalt.

 The
project
includes
cold
milling
pavement
repairs,
street
name
signs,
striping,
replacement
of
traffic
induc3ve
 loops.
 Street
Resurfacing
from
Seaward
to
Mills
‐
Overlaying
approx.
714,000
square
feet
of
deteriorated
roadway
 with
new
asphalt.

The
project
includes
cold
milling
pavement
repairs,
street
name
signs,
striping,
replacement
 of
traffic
induc3ve
loops. Street
Resurfacing
‐
Montalvo
Neighborhood
West
‐
Resurfacing
approximately
36
lane
miles
of
residen3al
 streets
and
includes
pavement
repair,
surface
prepara3on,
crack
sealing,
and
slurry
seal
applica3ons.
 Victoria
Avenue/US‐101
Interchange
Phase
2
‐
This
project
consists
of
widening
and
realigning
the
northbound
 onramp
and
offramp
in
order
to
improve
the
safety
of
motorists
entering
and
exi3ng
the
freeway.

Design,
 permits
&
environmental
are
done.
 Harmon
Barranca
Stormdrain
Repairs
at
Major
Roadways
‐
will
replace
'80
and
50'
deteriorated
strom
drain
 pipes
under
Telephone
and
Telegraph
Roads
respec3vely,
Repairs
are
necessary
by
late
2009
to
prevent
costly
 roadway
collapses
and
sinkholes. Day
Road
Booster
Pump
Sta3on
Electrical
Upgrade
‐
replace,
upgrade,
and
relocate
a
failing
electrical
panel
at
 the
Day
Road
booster
pump
sta3on
for
the
Water
Distribu3on
System.
The
electrical
system
has
reached
the
 useful
end
of
its
life
cycle.
 Harbor
Blvd/Olivas
Park
Dr.
Drainage
Project
‐
Consists
of
replacing
354
linear
feet
of
exis3ng
deteriorated
 storm
drain
pipe
underneath
and
adjacent
to
Harbor
Blvd.
at
Olivas
Park
Dr.

with
a
48
diameter
HDPE
pipe.

 The
pipe
replacement
is
necessary. Booster
Pump
Sta3on
Fixed
Emergency
Power
‐
Installa3on
of
two
permanent
emergency/backup
generators
 to
provide
the
ability
to
automa3cally
run
water
distribu3on
system
pump
sta3ons
during
extended
power
 outages
at
strategic
loca3ons.
 Wastewater
Treatment
Plant
Aera3on
Blowers
‐
The
project
consists
of
replacing
exis3ng
deteriorated
blowers
 and
a
building
enclosure
with
more
energy
efficient
blowers.
The
design,
permiqng
and
environmental
 clearance
is
completed. Surfers
Point
Improvements
‐
This
project
is
to
protect
the
beach
with
natural
buried
cobble
stone,
create
sand
 dunes
over
the
buried
cobble,
relocate,
and
rebuild
the
State
Owned
Omer
Rains
beach
front
bike
path,
and
 construct
parking
lot
and
drainage. Bank
of
chargers
for
airport
radios Facemasks
for
SCBA
dedicated
to
the
ARFF
(5) Thermal
Imaging
cameras
(2) AFFF
(foam
for
aircrab
firefigh3ng)
‐
200
gal. Personnel
Protec3ve
Equipment
(turn‐outs
firefighter
clothing
‐
18
sets) Type
III
Wildland
Fire
Engine
(for
ability
to
mi3gate
open
area
wildland
fires.

Currently,
we
do
not
have
an
off‐ road
fire
engine
for
wildland
fires.

The
airport
is
surrounded
by
acres
of
open
areas). Construct
10‐unit
Nested
Tee
Hangar
‐
East
side Access
Road
North
of
Runway Westside
Hangar
Development
&
Infrastructure Mul3‐modal
transit
center
expansion Oval
Park
Renova3on Job
Incubator
Facility
Remodal Recrea3on
Park
Renova3on Conven3on
Center
Remodal Municipal
Animal
Control
Facility Water
controllers
in
parks Replacement
of
incandescent
traffic
signals
with
energy
efficient
LED
lights Water
controllers
in
L&L
districts CNG
Slow
Fill
Sta3on
at
Corpora3on
Yard
‐
Solid
Waste
Trucks Municipal
energy
retrofits Solar
on
city
facili3es

Funding
Required

Jobs












1,500,000


22










25,000,000


15










30,000,000


35












5,500,000


165














450,000


14














500,000


15












1,000,000


30












1,200,000


32












1,300,000


33












1,700,000


37












3,500,000


105












3,500,000


105












5,000,000


150










10,000,000


300
















60,000


2














150,000


4














400,000


14














500,000


15












5,000,000


150












6,000,000
 















1,000
 















3,500
 














30,000
 















6,000
 














36,000


180 0 0 0 1 1














305,000
 












810,000
 










1,500,000
 










5,000,000
 










3,000,000
 














90,000
 












100,000
 












500,000
 










2,000,000
 










6,000,000
 












200,000
 












300,000
 












400,000
 












450,000
 










2,000,000
 








20,000,000


3 18 33 111 60 2 11 11 44 133 5 7 9 10 44 44

City

State

Program

Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia

CA CA CA CA CA CA CA CA CA CA CA CA CA

Energy Energy Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools

Visalia Visalia Visalia Visalia Visalia Visalia Visalia

CA CA CA CA CA CA CA

Schools Schools Schools Schools Schools Schools Schools

Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia Visalia

CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA CA

Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Water

Visalia Visalia Vista Vista Vista Vista Vista Vista West
Sacramento

CA CA CA CA CA CA CA CA CA

Water Water CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Water Energy

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

West
Sacramento

CA

Streets/Roads

Project
Descrip3on Low
income
housing
energy
retrofits Water
efficiency
measures Housing
Unit
Project
#30‐19 Housing
Unit
Project
#30‐16 Crime
View
‐
advance
mapping
interface
to
exis3ng
CAD
and
RHS iBridge
sobware
‐
uncover
connec3ons,
paferns
and
rela3onships
hidden
in
data Sobware
by
'Systeen'
to
conduct
a
forensic
analysis
on
a
cell
phone Arson
Inves3gators Financial
crimes
detec3ves
to
address
growing
problem
of
iden3ty
theb Dispatchers
‐
for
fire
calls 1
sergeant
and
4
officers
for
Street
Crime
Unit
‐
focus
on
violent
offenders Install
Emergency
Vehicle
Detectors
at
50
signalized
intersec3ons Large
Knox
Box
for
40
school
sites
at
$500
each
(secure
steel
boxes
are
designed
to
hold
keys
for
building
 access
as
well
as
emergency
site
documents;
these
are
used
by
fire
and
police
personnel
during
emergency
 incidents) Mineral
King
Bowl
ligh3ng
systems Mul3ple
school
site
irriga3on
system
moderniza3on Golden
West
HS
electrical
infrastructure Mt.
Whitney
HS
electrical
infrastructure Mt.
Whitney
HS
alarms/telephones/network Mt.
Whitney
HS
school
library Quick
connec3on
outlets
for
emergency
power
(portable
generators)
for
school
gyms/mulitpurpose
rooms.
 These
sites
would
be
used
for
shelters
during
disasters/emergencies.
40
sites
x
$50,000 Redwood
HS
school/community
pool Traffic
Signal
at
Court
and
Whitendale Traffic
Signal
at
Demaree
and
Mill
Creek Burke
Street
from
Houston
to
Roosevelt Street
Rehabilita3on
‐
Minor
Overlays Street
Rehabilita3on
‐
Dig
Outs Civic
Center
Block
Infrastructure
‐
Oak
and
School
extensions
and
Burke
Street
widening Tulare
Avenue
Extension
from
Lovers
Lane
to
McAuliff
Street Street
Rehabilita3on

‐
Cape
Seals Street
Rehabilita3on
‐
Major
Overlays Ben
Maddox
overcrossing
of
State
Route
198 E‐85
Fueling
Sta3on Transit
Buses
for
shufle
service Transit
Center
Expansion Transit
Shufle
Center
Construc3on Transit
Maintenance
Facility
Expansion Computer
Control
System
at
each
libsta3on
that
provides
opera3ng
informa3on
to
Treatment
Plant Mineral
King
Avenue
Sewer Sewer
Installa3on
in
Annexed
Areas Creek
Walk Park
Maintenance
Facility
‐
Phase
1 Thibodo
Road
Improvements East
Vista
Way
Resurfacing
&
Traffic
Signals Melrose
Drive,
Bobier
Drive,
N.
Santa
Fe
Avenue,
&
North
Drive
Resurfacing
 Buena
Ouzall
Manhole
Rehabili3on


 Port
of
Sacramento
Power
Plant
–
Private
Public
Partnership: Enligna
US
Inc.
is
construc3ng
a
wood
pellet
manufacturing
and
export
terminal
at
the
Port
of
Sacramento.

 Enligna
will
be
impor3ng
wood
waste
that
is
currently
burned
in
orchards Port
of
Sacramento
Entrance
and
Intersec3on:

This
project
will
facilitate
the
construc3on
of
a
new
fully
 signalized
intersec3on,
with
rail
protec3on,
at
Harbor
and
Beacon
Boulevards.

 I
Street
Bridge
Rail
Replacement
Project:
Several
areas
on
the
I
Street
Bridge
to
be
repaired
or
maintained
for
 safety
purposes.

The
I
Street
Bridge
has
been
iden3fied
as
being
on
the
Na3onal
Register
of
Historic
Places. Cemex
Rail
Access
Project:

This
project
is
planned
and
designed
to
construct
a
rail
line
from
the
Port
of
 Sacramento
to
a
regional
concrete
import
facility.

The
City’s
is
partnering
with
private
industry
and
public
 contribu3ons
to
the
project West
Sacramento
Community
Center:

The
new
West
Sacramento
Community
Center
is
driven
by
the
 community’s
need
for
connec3vity
and
a
stronger
iden3ty.

Embracing
the
opportunity
to
create
a
true
 Community
Center
formed
around
a
performing
arts
facility, Reconstruc3on
of
Tower
Bridge
Gateway
(former
SR‐275):

This
project
is
part
of
the
de‐industrializa3on
of
the
 City
waterfront
and
will
re‐construct
this
grade‐separated
freeway
(built
to
provide
quick/easy
access
to
 downtown
Sacramento)
into
a
“front
d City
Corpora3on
Yard:

The
City
of
West
Sacramento
has
experienced
a
substan3al
amount
of
growth
over
the
 last
five
years.
As
a
result,
demands
for
city
services
and
facility
maintenance
have
risen
drama3cally. Port
of
Sacramento
Project
Cargo
Terminal; The
Port
of
Sacramento
is
the
closest
port
to
Solano
County
wind
areas
and
has
become
a
major
importer
of
 wind
energy
equipment.

The
Port
has
lefers
of
intent
to
increase
the
shipment
of
this
cargo. West
Capital
Avenue
Extension
(former
US‐40):

This
project
consists
of
construc3on
of
streetscape
 improvements
in
a
one
mile
stretch
of
West
Capitol
between
Jefferson
Boulevard
and
Sycamore
Avenue.

While
 maintaining
status
as
a
truck
route
and
major
artery South
River
Road
Barge
Canal
Crossing
and
Village
Parkway
Extension
Project:
The
South
River
Road
Barge
 Canal
Crossing
and
Village
Parkway
Extension
Project
is
a
needed
traffic
improvement
to
reduce
travel
3mes
 and
accommodate
mul3‐model
travel
(transit Sacramento
Deep
Water
Ship
Channel:

This
project
is
the
federally
authorized
project
proposed
by
the
US
 Army
Corps
of
Engineers
to
deepen
the
Sacramento
Deep
Water
Ship
Channel
from
30
to
35
feet.

Funding
Required 










5,000,000
 










5,000,000
 












139,775
 












264,030
 














23,000
 















9,000
 















2,000
 












250,000
 












398,679
 












400,000
 












812,270
 












360,000


Jobs 111 111 15 35 0 0 0 2 3 4 5 8
















20,000
 












500,000
 












550,000
 












500,000
 












500,000
 










1,000,000
 












250,000


1 10 12 15 15 20 25












2,000,000
 












650,000
 












200,000
 












200,000
 












500,000
 










1,000,000
 










1,500,000
 










2,000,000
 










2,000,000
 










2,000,000
 










2,500,000
 










8,500,000
 












200,000
 










2,750,000
 










3,000,000
 










3,000,000
 










4,000,000


30 30 5 5 11 22 33 43 43 44 55 184 4 57 66 66 88












1,000,000
 










1,500,000
 










3,000,000
 












700,000
 










1,200,000
 












500,000
 












850,000
 








10,000,000
 












918,900


20 33 65 21 36 8 25 300 30










11,000,000


220














850,000


17












1,200,000


24












1,400,000


28












7,750,000


150












8,000,000


160










20,000,000


200










17,500,000


250










20,000,000


400










32,100,000


642










60,000,000


1200

City

State

Program

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

West
Sacramento

CA

Water

Arvada

CO

Streets/Roads

Arvada

CO

Streets/Roads

Arvada Arvada

CO CO

Streets/Roads Streets/Roads

Aurora

CO

Streets/Roads

Boulder

CO

CDBG

Boulder

CO

CDBG

Boulder

CO

CDBG

Boulder

CO

Energy

Boulder

CO

Schools

Boulder

CO

Streets/Roads

The
Rivers
Area
Water
Storage
Tank
and
Pump
Sta3on:

This
community
health
and
safety
project
is
planned
 and
designed
to
construct
a
1.9
million
gallon
water
storage
tank
and
a
4
million
gallon
per
day
pump
sta3on
 housed
in
a
masonry
building.
 Yolo
Bypass
Levee
Deficiency
Repairs
Project:

This
community
safety
project
is
planned
and
in
the
design
and
 environmental
documenta3on
stage.

The
authorized
project
involves
the
reconstruc3on
of
an
exis3ng
levee Main
Drain
Pump
Sta3on:
The
Main
Drain
Pump
Sta3on
project
consists
of
the
reconstruc3on
of
a
master
 planned
storm
drainage
pump
sta3on
which
is
needed
to
service
the
Southport
area
of
the
City
of
West
 Sacramento.
It
is
located
at
the
engineered
end
o Sacramento
Bypass
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the
 design
and
environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
seepage
barriers
up
 to
a
maximum
depth
of
110
feet
for
a
total The
Rivers
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the
design
and
 environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
seepage
barriers
up
to
a
 maximum
depth
of
110
feet
 Sacramento
River
Bank
Protec3on
Project:

The
Sacramento
River
Bank
Protec3on
Program
is
a
currently
 authorized
program.

The
project
involves
repairing
8,100
feet
of
high
priority
erosion
sites
and
5,000
feet
of
 moderate
priority
erosion
sites Stone
Lock
Area
Levee
Improvement
Project:

This
community
safety
project
is
planned
and
in
the
design
and
 environmental
documenta3on
stage.

The
project
involves
the
construc3on
of
a
setback
levee
with
a
seepage
 cutoff
barrier
along
3.3
miles Naviga3on
Levee
Improvement
Project:

The
Naviga3on
levee
along
the
Yolo
Bypass
is
a
federally
owned
and
 maintained
facility.

There
is
approximately
60,000
feet
of
high
priority
erosion
sites
that
require
immediate
 repair. Garrison
Street
Bridge
Replacement.

Replaces
inadequate
bridge
for
street,
waterway,
and
other
public
 improvements.

Project
also
removes
26
homes
from
floodway. W.
64th
Ave.
‐
McIntyre
to
Church
Ditch.

Comple3on
of
unfinished
segment
of
major
arterial
expansion
from
 two
lanes
to
four
lanes. W.
72nd
Ave.
and
Indiana
Street
(State
HWY
72)
Interse3on
Improvements.

 W.
74th
Avenue
Bridge
Replacement.

Deficient,
nonstandard
bridge
in
need
of
replacement
and
also
widening
 for
bike
and
pedestrian
access. Reconstruc3on
of
the
highway
interchange
at
Interstate
225,
17th
Place
and
Colfax
Ave.

The
project
will
 drama3cally
improve
access
to
the
Fitzsimons
campus
ahich
is
home
to
the
UCHSC
Health
Sciences
Center. Fund
installa3on
of
fire
sprinklers
in
permanently
affordable
rental
housing
units.

Nine
mul3‐family
sites,
with
 a
total
of
236
unites,
do
not
have
fire
protec3on
sprinklers. Mobile
home
parks
in
the
city
were
built
35‐50
years
ago
and
their
on‐site
infrastructure
is
deteriora3ng
 significantly.
The
city
has
funded
the
purchase
of
two
parks
by
affordable
housing
non‐profits
and
a
par3al
 infrastructure
replacement
 BHP,
the
housing
authority
for
the
city,
owns
and
manages
337
units
in
eight
public
housing
sites.


Funding
 would
go
to
renovate
these
proper3es,
which
were
built
between
1955
and
1982,
with
the
majority
of
units
 built
in
the
early
1970’s.
 Provide
funding
to
convert
60
hybrid
electric
vehicles
to
Plug‐in
Hyrbrid
Vehicles
with
Vehicle
to
Grid
 technology.

The
cars
are
part
of
the
City
of
Boulder,
Boulder
County
and
the
University
of
Colorado
fleets.

A
 mix
of
onboard
V2G
technology
and
smart Mapleton
Elementary
School
in
the
city
of
Boulder
was
built
in
1889
and
served
as
an
elementary
school
un3l
 2004,
which
it
was
closed
due
to
declining
enrollment.
A
community
coali3on
has
com
together
to
convert
the
 school
into
an
early
childhood
educa3on
facility Arterial
and
residen3al
reconstruc3on
projects.

ADA
sidewalk
and
access
ramp
improvements.

Project
Descrip3on

Boulder

CO

Transit

Install
Junc3on
Place
bridge,
pathways
along
Foothills
and
from
Goose
Creek
to
bus
sta3on

Boulder

CO

Transit

Boulder

CO

Transit

Colorado
Springs Colorado
Springs

CO CO

Airport Airport

Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs

CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Housing

Install
a
400
bike
system
(40
sta3ons)
a
la
"Velib"
in
Paris,
Rejuvenate
HOP
transit
service
with
purchase
of
four
 new
buses
(US
built) 30th
Street
bikeland
and
sidewalk
project,
Broadway
and
Euclid
transit
and
bike
improvements,
28th
Street
 intermodal
improvements.

TableMesa
bike/ped
underpass
to
park‐n‐ride Colorado
Springs
Airport
Solar
Array
Project Colorado
Springs
Airport
Business
Park
Interchange
connec3ng
the
Defense
Access
Road
with
Airport
 entry/exit
roads Pedestrian
Bridge
Replacement,
North
Shooks
Run
Trail Pikes
Peak
Greenway
Trail
Paving,
Dorchester
Park
to
El
Pomar
Youth
Sports
Park Sand
Creek
Trail
Construc3on,
Barnes
Rd
to
Stetson
Hill
Blvd City
Auditorium,
Life
Safety
Improvements Playground
Renova3ons
at
6
City
Parks Safe
Routes
to
Schools
‐
Cresta
Road
Sidewalks
&
Pedestrian
Ramps Safe
Routes
to
Schools
‐
North
Hancock
Avenue West
Moreno
Street
Sidewalks Meter
Data
Management
System 30th
Street
Shoulder
Improvements
&
Bike
Lanes Area
Revitaliza3on
‐
South
Nevada
Avenue
Infrastructure Area
Revitaliza3on
‐
South
Academy
Blvd
Infrastructure Citywide
Drainage
Improvements Cofonwood
Recrea3on
Center
Gym
&
Senior
Center
Expansion Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Parks
&
Recrea3on Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
U3li3es
Warehouse Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Fleet
Maintenance Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Street
Division Rehabilita3on/Replacement
of
Municipal
Facili3es
‐
Traffic
Engineering Wind
Turbine
for
Fire
Sta3on
21 Energy
Retrofits
for
Other
City
Facili3es Energy
Retrofits
for
15
Fire
Sta3ons Research
Educa3on
PV
Facili3es
(6MW) Hancock
Avenue
Housing
Development

Funding
Required

Jobs












4,500,000


90










15,000,000


210










16,000,000


320










23,600,000


472










38,900,000


778










40,000,000


800










70,300,000


1406










75,000,000


1500












1,000,000
 










1,000,000
 












300,000
 










2,300,000
 








50,000,000


2000














675,000


10












1,472,000


30












8,300,000


65












6,000,000













5,400,000


110












7,500,000


116












2,900,000


116












3,100,000


124










17,200,000
 








15,000,000


688 50










20,000,000
 














75,000
 












495,000
 












350,000
 












700,000
 












350,000
 












110,000
 












118,000
 












145,000
 










2,000,000
 










3,050,000
 










5,000,000
 








10,000,000
 








20,000,000
 










5,200,000
 










1,402,000
 










2,000,000
 










6,100,000
 










5,605,000
 










4,843,000
 














90,000
 










2,000,000
 










3,005,000
 








48,000,000
 










2,500,000


100 5 5 10 10 10 10 10 12 15 15 25 50 50 50 75 100 100 125 5 30 40 100 10

City

State

Program

Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs

CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Brookside
Street
Reconstruc3on Hancock
Exprressway
@
Chelton
Road
Realignment Plafe
Avenue
Widening
(from
Academy
to
Powers) Traffic
Safety
Improvements Pikes
Peak
Highway,
Erosion
and
Sedimenta3on
Control
project Vincent
Drive
Extension
‐
Woodmen
to
Nevada Centennial
Drive
Extension,
from
Fillmore
to
Fontanero I‐25
Widening
from
Academy
to
Interquest Sidewalks
and
Pedestrian
Ramps Major
Bridge
Replacements South
Metro
Accessibility
Project
(Milton
E.
Proby
Parkway)
‐
Academy
to
Powers I‐25
Widening
from
Northgate
to
Monument I‐25
Widening
from
Interquest
to
Northgate I‐25
@
Cimarron
St
Interchange I‐25
@
Fillmore
St
Interchange Local
Streets
Rehabilita3on
and
Resurfacing State
Highway
21
(Powers
Blvd)
@
Airport/Stewart
Interchange State
Highway
21
(Powers
Blvd)
@
Proby
Parkway
Interchange State
Highway
21
(Powers
Blvd)
North
‐
Complete
3
interchanges
at
Briargate,
Union
and
Old
Ranch

Project
Descrip3on

Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs

CO CO CO CO CO CO

Streets/Roads Streets/Roads Transit Transit Water Water

Woodmen
Corridor
‐
Widening
&
Interchanges State
Highway
21
(Powers
Blvd)
North,
Extension
to
I‐25 Purchase
16
Buses Intermodal
Transit
Sta3on Fountain
Valley
Water
Treatment
Plant
‐
Potable
Water
Mains Low‐Impact
Development
Demonstra3on
Center
to
educate
the
public
about
decreasing
stormwater
runoff

Colorado
Springs Colorado
Springs Colorado
Springs

CO CO CO

Water Water Water

Big
Tooth
Dam
Rehabilita3on Fire
Hydrant
Install Fountain
Creek
Improvements
–
Eco‐Fit
Park
for
wetland
development,
drop
structures
and
educa3on

Colorado
Springs Colorado
Springs Colorado
Springs

CO CO CO

Water Water Water

Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Colorado
Springs Denver Denver Denver Denver

CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO

Water Water Water Water Water Water Water Water Water Water Water Water Public
Safety Public
Safety Public
Safety Transit

Denver

CO

Transit

Las
Vegas
Wastewater
Treatment
Plant
Disinfec3on Manhole
Rehabilita3on
and
Replacement
Program Fountain
Creek
Improvements
–
Clear
Springs
Ranch
for
wetlands
development,
bank
improvementsand
creek
 realignment Fountain
Creek
Improvements
–
Pueblo
for
sediment
removal
and
levee
reinforcement Highline
Reservoir
Cover
Replacement
 Sand
Creek
Regional
Deten3on
Ponds Sanitary
Sewer
Creek
Crossing
Program Local
Collectors
Evalua3on
and
Replacement
Program Sanitary
Sewer
Evalua3on
and
Rehabilita3on
Program Southeast
Nonpotable
System
Extension Northern
Nonpotable
System
Extension Southern
Delivery
System
‐
water
delivery
pipeline,
pump
sta3on Water
Main
Replacements Fountain
Creek
Stabiliza3on
and
Enhancements,
Manitou
Springs
to
Sand
Creek Cofonwood
Creek
Stabiliza3on
and
Deten3on Opera3onal
Safety:
Upgrade
Traffic
Signal
Control
Systems Opera3onal
Safety:
Safety
Improvements
at
15
Intersec3ons
(Signal
Replacement) Opera3onal
Safety:
Smart
Meter
parking
meter
replacement Enhancement‐‐Bike
and
Pedestrian:
Alameda
to
Broadway
Bikeway
(Alameda
LRT
Sta3on
to
Broadway
LRT
 Sta3on) Enhancement‐‐Bike
and
Pedestrian:
Bike
Sta3on
at
Denver
Union
Sta3on
Transit
Hub

Denver

CO

Transit

Denver

CO

Denver

CO

Denver

CO

Denver

Funding
Required Jobs 










2,000,000
 15 










7,000,000
 15 










6,000,000
 15 








10,000,000
 25 








10,000,000
 30 








15,000,000
 30 










3,000,000
 40 








37,000,000
 40 








20,000,000
 50 








30,000,000
 60 








60,000,000
 60 








72,000,000
 75 








80,000,000
 80 






100,000,000
 100 








60,000,000
 100 








40,000,000
 100 








57,000,000
 100 








50,000,000
 100 








45,000,000
 






125,000,000
 






105,000,000
 










3,000,000
 








12,000,000
 












500,000


100 100 200














600,000
 










1,600,000
 










1,000,000


2 5 5












2,300,000
 










2,000,000
 










2,450,000


5 10 10












5,800,000
 










4,500,000
 










5,000,000
 








10,000,000
 








13,300,000
 








14,300,000
 








10,000,000
 








15,000,000
 








18,000,000
 








38,000,000
 








12,500,000
 








20,000,000
 








50,000,000
 










3,000,000
 










3,600,000
 










4,000,000


15 15 15 25 25 30 30 30 35 45 45 50 100 17 20 22














750,000


4

60 2












1,000,000


6

New
Transporta3on
Construc3on:
56th
Avenue,
Quebec
thru
Havana
Transi3on












3,000,000


17

Transit

Transporta3on
Reconstruc3on:
Alameda
Avenue
(University
of
Cherry
Creek
on
south
side
of
Cherry
Creek)












3,000,000


17

Transit












5,000,000


28

Transit

Enhancement‐‐Bike
and
Pedestrian:
West
Alameda/RR
Underpass
(ADA
and
bike
improvements,
and
 rehabilita3on
of
structure) Transporta3on
Reconstruc3on:
Cherry
Creek
Drive
South
(Alameda
to
Colorado
Blvd.)












7,000,000


39

CO

Transit

Transit
Support
Project:
16th
Street
Mall
Reconstruc3on










16,000,000


90

Denver

CO

Transit

Transporta3on
Reconstruc3on:
South
Broadway
(Iowa
to
Asbury)










17,000,000


95

Denver

CO

Transit

New
Transporta3on
Construc3on:
Federal
Blvd.
(7th
to
Holden
Place)










20,600,000


115

Denver

CO

Transit

Transit
Support
Project:
Downtown
Circula3on
Infrastructure










25,000,000


140

Denver

CO

Transit

New
Transporta3on
Construc3on:
Broadway/I‐25
Interchange
Improvements










38,000,000


213

Denver

CO

Transit

New
Transporta3on
Construc3on:
Central
Park
Blvd
Interchange










50,000,000


280

Denver

CO

Transit

Denver Denver Denver Denver Denver Denver Denver Denver Durango

CO CO CO CO CO CO CO CO CO

Water Water Water Water Water Water Water Water Airport










88,000,000
 










1,500,000
 










3,500,000
 










4,000,000
 










5,500,000
 










6,200,000
 










6,200,000
 








10,000,000
 








20,000,000


1190 8 20 22 31 35 35 56 112












1,300,000


130

Durango

CO

Energy

Transit
Support
Project:
Denver
Union
Sta3on
 *Number
of
jobs
created
based
on
EPS
study.
This
number
is
the
annual
average
over
years
2009‐2013 Cri3cal
Stormwater
Conveyance
Projects:
Wolff
Street
Bridge
over
Lakewood
Gulch Cri3cal
Stormwater
Conveyance
Projects:
Florida
Ouzall
Extension Cri3cal
Stormwater
Conveyance
Projects:
Cherry
Creek
North
Ouzall Cri3cal
Stormwater
Conveyance
Projects:
Park
Hill
Pond Cri3cal
Stormwater
Conveyance
Projects:
14th
and
Stout
Storm
Drain Cri3cal
Stormwater
Conveyance
Projects:
Bayaud
Ouzall Cri3cal
Stormwater
Conveyance
Projects:
Large
Pipe
and
Manhole
Rehab Cri3cal
Stormwater
Conveyance
Projects:
Montclair
Ouzall Airport
Terminal
Roadway
Reconstruc3on
Project‐This
project
will
replace
the
terminal
roads
that
are
currently
 in
very
poor
shape
and
are
failing.

Included
in
the
project
are
best
management
prac3ces. Historic
Library
Remodel
‐
Aber
105
years,
Durango’s
public
library
has
moved
to
a
new
loca3on,
leaving
 behind
a
historic
building
with
old,
inefficient
systems.

The
City
of
Durango
owns
the
building
and
would
like
 to
remodel
the
building
for
City
offices.












3,400,000


340

City

State

Program

Durango

CO

Energy

Durango

CO

Streets/Roads

Durango

CO

Streets/Roads

Durango

CO

Streets/Roads

Durango

CO

Streets/Roads

Durango

CO

Streets/Roads

Durango

CO

Streets/Roads

Durango

CO

Transit

Durango

CO

Water

Englewood

CO

CDBG

Englewood

CO

CDBG

Englewood

CO

Public
Safety

Regional
Materials
Recycling
Facility
‐
Durango’s
exis3ng
recycle
center
is
14
years
old
and
has
become
 insufficient
to
handle
the
amount
and
type
of
materials
the
community
recycles.

 Railroad
Crossings
at
32nd
Avenue
‐
This
project
will
replace
the
current
tradi3onal
crossing
at
32nd
Avenue
 with
a
crossing
made
from
recycled
materials
that
is
safer
for
both
pedestrians
and
bicyclists. Accessible
Sidewalks
‐
Construc3ng
accessible
sidewalks
along
Main
Avenue
from
14th
Street
to
37th
Street
in
 Durango
would
allow
consistent
and
improved
access
to
the
businesses
along
Main
Avenue.

Few
of
the
 intersec3ons
have
sidewalk
ramps
at
this
3me. Traffic
Signals
‐
This
project
includes
the
reconfigura3on
or
installa3on
of
new
traffic
signals
to
improve
traffic
 flow
at
highly‐congested
areas
of
Durango.

Included
in
the
project
are
plans
to
incorporate
bike‐
and
 pedestrian‐friendly
features Sidewalk
Replacement
in
Historic
Downtown
‐
Deteriorated
sidewalks
in
historic
downtown
Durango
have
been
 iden3fied
in
the
Downtown
Vision
Plan
as
a
priority
project.

In
addi3on
to
replacing
the
sidewalks,
the
project
 includes
installing
street
furnitu SMART
160
Mul3‐modal
Trail
‐
U.S.
Highway
160
is
the
only
east‐west
highway
through
La
Plata
County
and
has
 long
been
an
impediment
to
safe
travel
for
bicyclists
and
pedestrians
due
to
the
high
traffic
volumes
and
 speed.
 Florida
Road
Improvements
‐
Plans
for
widening
this
busy
arterial
road
include
the
installa3on
of
curb,
gufers,
 sidewalks,
bike
lanes,
pedestrian
crossings,
medians,
landscaping,
streetlights,
storm
drains,
and
other
safety
 improvements
 Downtown
Parking
Garage
‐
This
224,000‐square‐foot
parking
garage
would
provide
adequate
mul3‐modal
 parking
to
afract
development
to
downtown
Durango.

The
garage
will
be
constructed
in
conjunc3on
with
the
 new
regional
transit
center
(already
under
construc3on) Storm
Water
Pre‐treatment
‐
The
City
of
Durango
currently
maintains
57
storm
drain
pipelines
that
collect
 storm
water
from
throughout
the
city’s
roadway
system.
Sediment
and
hydrocarbons
are
washed
from
the
 roadway
surface
into
the
storm
drains Sidewalk
missing
links
program.

Provide
for
sidewalks
in
areas
of
the
City
in
which
sidewalks
are
not
present.

 The
majority
of
these
are
located
in
low
income
areas
and
serve
transit
connec3ons
and
the
Alterna3ve
High
 School. South
Broadway
ornamental
ligh3ng
and
median
landscape
renova3on.
Provide
for
the
replacement
of
 deteriorated
street
median
landscaping
and
obsolete
and
malfunc3oning
ornamental
ligh3ng
in
the
historic
 downtown
district
on
South
Broadway.
The
Business Digital
Interface
Police/Court
case
Management
System

Project
Descrip3on

Funding
Required

Englewood

CO

Public
Safety

Evidence
tracker
sobware
















60,000


Englewood

CO

Public
Safety














300,000


Englewood

CO

Public
Safety

Fire
SCBA
‐
Self‐Contained
Breathig
Apparatus
replacement.

Replace
end‐of‐useful
life
SCBA
equpment
and
 mobil
servicing
vehicle. Mobile
Data
Terminal
replacement‐
replacement
of
obsolete
mobile
data
terminals

Englewood

CO

Public
Safety

Tac3cal
vests
for
SWAT
team
















55,000


Englewood

CO

Streets/Roads

Englewood

CO

Streets/Roads

Englewood

CO

Streets/Roads

Englewood

CO

Streets/Roads

Englewood

CO

Transit

Bridge
rehabilita3on
program.

Con3nua3on
of
annual
program
for
rehabilita3on
of
bridges
as
iden3fied
by
the
 Colorado
Department
of
Transporta3on
2008
bridge
inspec3on
program. Concrete
replacement
program.

This
project
is
the
annual
sidewalk,
curb
and
gufer
replacement
program
for
 the
City
and
funding
of
this
project
is
matched
by
property
owners
through
an
annual
concrete
u3lity
fee.
 Street
rehabilita3on
program‐upgrade
of
City
street
infrastructure.

This
is
a
con3nua3on
of
4
year
project
 ini3ated
in
2006,
but
discon3nued
due
to
lack
of
funding.

Street
system
infrastructure
is
over
50
years
old
and
 South
Broadway
Median
extension.

Con3nua3on
of
traffic
median
program
ini3ated
in
2000
with
a
federally
 funded
project
and
extended
with
a
second
federally
funded
project
in
2008.

This
project
would
complete
the
 medians
throughout
the
City
 Purchase
two
25
passenger,
handicap
accessible
buses
for
intercity
transit
service
(Art
Shufle)

Englewood

CO

Transit

Englewood Englewood Englewood Englewood

CO CO CO CO

Water Water Water Water

Bates
Avenue
Light
Rail
Sta3on
‐
city
share
of
new
light
rail
sta3on.
Denver
Regional
Transporta3on
District
is
 funding
1/3
of
cost,
which
is
currently
in
place.

This
project
will
allow
for
redevelopment
of
former
 foundry/brownfield
site
remedia3on Water
system
security
vulnerablility
assessment
upgrades Water
pumping
transformer
replacement. Sanitary
sewer
main
replacement‐
replacement
of
aged
sewer
lines‐2
year
planned
replacement Storm
water
line
replacement
‐
replacement
of
storm
water
lines
‐
2
year
replacement
program

Englewood Englewood Englewood Englewood Englewood

CO CO CO CO CO

Water Water Water Water Water

Elevated
tanks
and
pipe
rehabilita3on Pipe
City
Ditch
(open
water
delivery
ditch)
in
southern
areas
of
City. Replace
roof
of
Water
Treatment
Plant Hampden
Avenue
16"
Water
Main
replacement Water
main
replacement
‐
replacement
of
aged
water
mains
‐
2
year
planned
replacement
program

Englewood

CO

Water

West
Union
Avenue
16"
Water
Main
replacement.

Englewood

CO

Water

Water
storage
tank
rehabilita3on.
Rehabilita3on/valve
replacement
of
the
City's
three
water
storage
tanks.

Greeley Greeley Greeley Greeley Greeley Greeley Greeley Greeley Greeley Lakewood Lakewood Lakewood Lakewood Lakewood Lakewood

CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO

Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Fire
Sta3on
No.
2
replacement Fire
Sta3on
No.
3
replacement Public
Safety/Government
Training
Facility 20th
St
from
71st
to
83rd
Ave
widening 23rd
Ave
and
4th
St
intersec3on
reconstruc3on 9th
and
10th
Streets
at
23rd
Ave
reconstruc3on North
11th
Ave
from
2nd
to
D
St
widening Ammonia
removal
project Bellvue
transmission
pipeline Clements
Community
Center
‐
HVAC
System
Replacement Clements
Community
Center
‐
Roof
Replacement Jewell
Ave
between
Union
and
Kipling
‐
Upgrade
guard
rail Linda
Vista
Dr
and
Nelson
Ct
‐
Upgrade
guard
rail,
both
sides Linda
Vista
Dr
and
Newcombe
Wy
‐
Upgrade
guard
rail,
both
sides Estes
Street
over
Bear
Creek
‐
 Upgrade
bridge
railing

Jobs










15,000,000


1500














250,000


25














900,000


90












2,400,000


240












3,000,000


300












8,000,000


800










15,500,000


1550










12,700,000


1270












3,420,000


340














130,000


10














900,000


30
















37,500















100,000















140,000


5














268,000


20














920,000


20












2,000,000


30
















90,000













7,200,000
 














25,000
 












106,000
 












200,000


120 1 2 3














200,000
 












423,000
 












300,000
 












500,000
 












500,000


4 5 6 8 10














300,000


10














500,000


10












1,000,000
 










4,228,735
 










3,880,265
 








17,373,010
 










5,168,180
 










1,611,360
 










3,100,000
 










2,251,725
 










3,677,700
 








37,609,900
 












200,000
 












250,000
 














10,000
 














10,000
 














10,000


15
















20,000


15

6 10 12 12 12

City

State

Program

Lakewood

CO

Streets/Roads

Project
Descrip3on

Lakewood

CO

Streets/Roads

Lakewood

CO

Streets/Roads

Merino Merino Rico
 Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Thornton Bridgeport Bridgeport Bridgeport

CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CO CT CT CT

Water Water Water CDBG CDBG CDBG CDBG Energy Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water Water Water Water Water Water Airport CDBG CDBG

Garrison
Street,
Alameda
Avenue
to
Jewell
Avenue
‐
 Repair
of
curb,
gufer,
sidewalk,
asphalt
overlay
of
pavement,
in
laid
long
life
striping Water
System
Improvements,
New
Well
and
Distribu3on
Lines Wastewater
Collec3on
Treatment
System
Improvements Waste
Water
Improvement Streetscape
Improvements Park
Village
Pool
Rehabilita3on Local
Street
Rehabilita3on Carpenter
Rec
Center/Thornton
Trail
Winds
Park
&
Open
Space City
Building
energy
efficiency
improvements Crime
Analyst K‐9
(canine)
Team High
Density
Housing
Crime
Preven3on/Enforcement
Unit Fire
Sta3on
#5 Washington
St
Bridge
at
153rd Washington
St
Bridge
at
160th 128th
Ave:
Washington
to
I‐25 136th
Ave:
Cherry
to
Holly 144th
Ave:
Colo
to
Holly 152nd
Ave:
Colorado
to
Holly Sack
Creek
Drainage
Phase
2 Shay
Ditch
Drainage Holly
Street:
123rd
to
128th Mustang
Run
Drainage 144th
Ave:
UPRR
to
Colo
Blvd Washington
St
widen
over
E‐470 Holly
Street:
144th
to
HW‐7 144th
Ave:
Wash
to
UPRR 104th
Ave:
Colo
Blvd
to
Plafe
River Quebec
Interchange
at
E‐470 Quebec
Improvements
to
HW‐7 128th
Avenue
Interchange
at
I‐25 84th
Avenue/I‐25
Interchange Colo
blvd:
144th
to
HW‐7 Colo
Blvd:
91st
to
I‐76 Grade
Separa3on
at
136th
Ave/York/North
Metro
Rail
Line Big
Dry
Creek
Parallel
Sewer Biological
Nitrate
Removal
Facility Zone
One
Potable
Waterline Raw
Water
return
pipeline
and
pump Water
Treatment
Plant
Expansion West
Sprat
Expansion Wheeling
Plan
Implementa3on Airport
Garage
Repair
and
Rehabilita3on Regional
Network
of
Programs
Renova3ons Washington
Park
Revitaliza3on
Corpora3on
Renova3on
Project
for
Alpha
Community
Services


Bridgeport

CT

CDBG

Boys
&
Girls
Village
Renova3on
Project
(170
Bennef
Street)

Bridgeport

CT

CDBG

Bridgeport

CT

Bridgeport

Kentucky
over
Weir
Gulch
‐
 Install
bridge
railing Kipling
St
and
Wesley
Ave
‐
Guard
rail
installa3on

Funding
Required

Jobs
















25,000


15
















35,000


15














900,000
 










1,600,000
 










3,134,000
 








10,000,000
 












800,000
 












389,000
 










1,650,000
 










8,000,000
 










1,006,189
 












107,000
 












306,986
 










1,065,500
 










6,000,000
 










1,600,000
 










1,600,000
 










2,020,000
 










2,800,000
 










6,000,000
 










6,000,000
 










6,000,000
 










6,000,000
 










6,200,000
 










8,000,000
 










9,700,000
 








11,000,000
 








12,000,000
 








12,500,000
 








16,000,000
 








16,000,000
 








18,000,000
 








21,000,000
 








25,000,000
 








25,000,000
 








60,000,000
 








40,000,000
 










3,000,000
 










9,500,000
 








10,200,000
 








17,000,000
 








22,500,000
 








26,000,000
 








67,773,000
 












400,000
 














50,800


20 160 313 200 8 10 16 80 10 1 1 4 60 16 16 20 28 60 60 60 60 62 80 97 110 120 125 160 160 180 210 250 250 600 490 30 95 100 170 225 260 677 8 3
















55,575


3














100,000


4

Bridgeport
Area
Youth
Ministry
Facade
Upgrade
&
addi3onal
of
2
HVAC
units
to
Industrial
Youth
Center
















75,000


4

CDBG

Center
for
Women
&
Families
Capital
Improvements
at
City's
Safe
House
for
bafered
women
&
children














100,000


4

CT

CDBG

Roberto
Clemente
Condominiums
Repairs
Project

Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT

CDBG CDBG CDBG CDBG

The
Bridgeport
Gateway
COOP
Inc.

Replacement
of
Central
Boiler
System Wenzield
Bathrooms
Structure
(Park
Improvements,
design
and
planning
complete)
 Fire
Company
6/8
Repairs
(Roof
Repair
and
upgrade)
 Public
Safety
Camera
System
designed
for
regional
transporta3on
hubs
and
high‐crime
neighborhoods















300,000
 












300,000
 












234,000
 












645,000


4 4 4 6

Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT

CDBG CDBG CDBG CDBG

Stone
Ridge
II
Roof
Replacement
Project West
Side
Police
Precinct
Rehab
Project William
Street
Condo
site
work Wheeler
Fountain
Restora3on
Project
(Plumbing,
sitework
and
paving/
design
complete)















300,000
 












250,000
 












500,000
 














35,000


6 6 6 6














855,939


7

Bridgeport

CT

CDBG
















75,000


8

Bridgeport

CT

CDBG

Bridgeport
Parks
Department
Luis
Marin
Park
Recrea3onal
Enhancements
/
Water/
Splashpad
Playground
with
 landscape
furnishings
 Charles
D.
Smith
Founda3on
(Interior
repairs,
fencing
&
HVAC
installa3on
of
community
facility
in
East
End)
















200,000


8

Bridgeport

CT

CDBG

Hall
Neighborhood
House
HVAC/
Furnace
Boiler
System
Repair














350,000


8

Bridgeport

CT

CDBG

McGivney
Center
Interior
Renova3on
Project
(Repair,
Roofing
&
Build
out
of
Teen
Center
Space)


Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT CT

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

8 8 8 10 10 10 10












1,000,000


10

Bridgeport

CT

CDBG

Senior
Center
Repairs
and
Renova3ons
(Black
Rock
and
Eisenhower
Center)
 United
Cerebral
Palsy
Center
Expansion
of
lower
level
MATC
/
2326
East
Main
Street
 Cardinal
Shehan
Center
Safety
&
Energy
Conserva3on
Project Fire
Company
12
Roof
and
Facility
Repairs Fire
Company
3/4
Wood
Avenue
Repairs
and
Renova3ons
(Roof
Repair)
 Marrakech,
Inc.
Renova3on
Project
of
Senior
Center
&
Affordable
Housing
Units Parks/
BAYSO
ACF
Soccer
Fields
‐
Construc3on
of
2
new
fields
Seaside
Park,
resurface
Kennedy
&
Hedges
 Stadium YMCA
South
End
Community
Center
Rehabilita3on
Project















750,000
 












565,000
 














75,000
 










1,101,748
 










1,000,000
 












850,000
 










1,654,351













1,000,000


12

Bridgeport

CT

CDBG

Animal
Shelter
Expansion
(to
increase
capacity
for
housing
of
animals/
design
complete)















700,000


14

City

State

Program

Bridgeport

CT

CDBG

Bridgeport
Police
Ac3vi3es
League
Recrea3on
and
Educa3on
Center

Project
Descrip3on

Funding
Required 










3,750,000


Jobs 15

Bridgeport

CT

CDBG

Bridgeport

CT

CDBG

East
Side
Police
Precinct
Construc3on
Project
to
house
police
and
community
services













5,000,000


16

Police
Vehicle
Storage
Building
for
Emergency
Services
Unit
and
specialized
and
undercover
vehicles












4,000,000


Bridgeport

CT

CDBG

Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT

CDBG CDBG CDBG CDBG CDBG CDBG

Bridgeport

CT

CDBG

Bridgeport

CT

CDBG

The
Marrionville
Co‐ops
Landscaping,
Fencing,
EnergyImprovements
and
HVAC
repairs,
security
gates,
window
 repairs,
exterior
stucco
repairs/sealing Bridgeport
Fire
Department
Engine
15
&
7/11
Repairs Bridgeport
Fire
Department
Headquarters
Repairs
 McLevy
Hall
Government
Building
Renova3ons
and
Roof
Repair Sand
Salt
Building
‐
Construc3on
of
new
shed
(design
complete,
planning
complete) Seaview
Industrial
Park
(Site
improvements
project
contract
#5) Upgrading
water,
sewer,
and
storm
drains
at
the
former
Pequonnock
Village
and
Marina
Apartments
public
 housing
site
to
enable
the
reconstruc3on
of
mixed
use
project
on
sites Installa3on
of
sewer
in
Mar3n
Luther
King
Drive
at
the
site
of
the
Father
Panik
Village
public
housing
site
to
 enable
reconstruc3on
on
the
site Barnum
Museum
Renova3on
and
Restora3on
Project
(interior
structural
repair,
environmental
upgrade)


16














850,000
 










1,355,000
 










1,525,000
 










2,000,000
 












750,000
 










1,500,000


16 20 20 20 20 20












3,500,000


23












4,250,000


26












1,100,000


Bridgeport

CT

CDBG

30

City
Hall
Repairs
and
Renova3ons












2,100,000


Bridgeport

CT

30

CDBG

Citywide
Library
Renova3on
&
Repair
Projects
(Roof
Repair
for
Main
Library)













3,950,000


Bridgeport

35

CT

CDBG












1,500,000


35

Bridgeport

CT

CDBG












3,750,000


40

Bridgeport

CT

CDBG

Wonderland
of
Ice: Interior
Renova3ons
and
Code
Upgrades Bridgeport
Fire
Department
Training
Facility
(Renova3on
of
2
exis3ng
buildings
&
construc3on
of
4
story
tower
 with
burn
building/
site
assembled,
design
complete) Installa3on
of
City‐wide
Broadband
Network
for
Community
and
Municipal
Use










20,000,000


44

Bridgeport

CT

CDBG












3,430,000


50

Bridgeport

CT

CDBG

Bridgeport
Police
Department
Narco3cs
&
Vice
Facility
Building
(renova3on
of
building,
site
assembled,
design
 complete)
and
Police
Evidence
Center Police
Department
Headquarters
Renova3on
&
Upgrade












1,375,000


50

Bridgeport

CT

CDBG












4,000,000


80

Bridgeport

CT

CDBG

Port
Authority
Ferry
Garage
Construc3on
Project
(Planned
phase
of
intermodal
transporta3on
center
project/
 transit
oriented
development
/
design‐phase
completed,
site
assembled,
project
planning
complete)
–
 Es3mated
Cost:
$4
million Public
Facili3es
Administra3on
Building
/
Maintenence
Garage
Recycling
and
Sanita3on
Truck
Wash










27,080,000


120

Bridgeport

CT

CDBG

City
Hall
Annex
Repairs
and
Renova3ons
(Roof
Repair)













4,070,000


200

Bridgeport

CT

CDBG

Hurricane
Barriers
&
Flood
Control
Gates
Installa3on
Project










20,000,000


200

Bridgeport

CT

CDBG

Bridgeport Bridgeport

CT CT

CDBG CDBG

Steel
Point
Development
Infrastructure,
Shoreline
Replacement
Project
(Shoreline
replacement,
new
bulk‐head
 construc3on
at
Steel
Point
Development
site,
this
mixed‐use
development
project
on
a
50
plus
acre
waterfront
 parcel
is
the
largest
waterfront
deve Demoli3on
and
Remedia3on
of
City
Property Steel
Point
Development
Street
&
U3lity
Improvements
(site
assembled,
design
complete)











20,000,000
 








50,000,000


275 300

Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT

Energy Energy Energy Energy Energy Energy

LED
Traffic
Light
Conversion
Project
 Barnum/Knowlton
Urban
Access
Project
 Seaview/Central
Urban
Access
Water
Front
Project Deforest/Johnson’s
Creek
Water
Front
Project Energy
improvements
to
Administra3ve
Offices Emergency
Center
Electrical
Genera3on
Project
‐
Fuel
Cell
&
Generator
Purchase
&
Installa3on











38,312,550
 












400,000
 










1,000,000
 










1,000,000
 










2,600,000
 










1,500,000


400 4 10 10 11 22










15,275,000


30

Bridgeport

CT

Energy












4,200,000


38

Bridgeport

CT

Energy

Up‐Grades
to
Neighborhood
Parks/infrastructure
Improvements Washington
Park
which
is
in
a
Historic
District,
Nanny
Goat
Park,

 Upchurch
Park
and
Newfield
Park Bridgeport
School
System
&
City
Public
Facili3es
Efficiency
Retrofit
Project










15,000,000


70

Bridgeport

CT

Energy












8,300,000


150

Bridgeport

CT

Energy

Enviornmental
Remedia3on
Projects
for
Neighborhood
 Development
Ini3a3ves
and
Waterfront
Clean‐up East
Side
&
West
Side
Treatment
Plant
Waste
to
Energy
Biomass
Gassifica3on
Energy
Produc3on
Project










65,000,000


560

Bridgeport

CT

Energy

Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT CT CT CT

Housing Housing Housing Housing Housing Housing Housing Housing Housing

City
of
Bridgeport
Government
Center
LEEDS
building
for
Health,
Probate,
Government,
Senior
Center,
and
 Library Addi3on
of
funding
for
200
Coleman
Street
LEEDS
construc3on
of
3
public
housing
units Poplar
Street
public
housing
project
elevator
replacement Charles
Greene
security
ligh3ng Restora3on
of
retaining
walls
and
fencing
at
Trumbull
Gardens Iranistan
Ave
building
rehabilita3on
into
public
housing
units PT
Barnum
security
ligh3ng Storm
doors
at
various
public
housing
sites Fireside
electrical
meter
upgrades Installa3on
of
bus
shelters
at
PT
Barnum,
Fireside
Court,
CF
Greene,
Harborview
Village,
and
Marina
Village








100,000,000
 














50,000
 












125,000
 












175,368
 












226,321
 












437,373
 












434,373
 












400,000
 












480,000


600 1 2 3 4 6 6 6 7

Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing

Telecommunica3ons
and
sobware
update Vacancy
reduc3on
in
unoccupied
units Harborview
security
modifica3ons
and
front
entrance
repairs Trumbull
Gardens
building
11
elevators
repairs Charles
Greene
public
housing
new
roofs Adams
and
Olive
Street
building
restora3on Marina
Village
security
ligh3ng Sidewalk
improvements
at
Marina
Village Gary
Crook
Center
moderniza3on
and
consolida3on
of
offices Renova3on
of
vacated
building
into
housing
units
for
survivors
of
domes3c
violence 14
units
of
new
housing
construc3on
on
exis3ng
founda3on Marina
Village
public
housing
project
replacement
roofs Reconfigura3on
of
Bird
Street Replacement
of
siding
and
storm
water
handling
system
at
Trumbull
Gardens Site
improvement
to
Morris
Ave
and
construc3on
of
warehouse CCTV
System
wide














265,000
 












500,000
 












550,000
 












605,000
 












650,000
 












725,000
 












875,156
 












941,653
 












650,000
 










1,032,000
 










2,446,861
 










4,000,000
 










1,251,625
 










1,675,000
 










1,256,332
 










1,350,000
 










1,523,668


7 7 8 9 10 11 13 14 14 15 16 18 18 18 18 18 22

City

State

Program

Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing

Replacement
of
roofs
at
the
Scafered
Site
projects Trumbull
Gardens
sewer
system
reconstruc3on Windows
for
housing
at
Fireside
Court
elderly
housing
and
Scafered
Sites
536
units. Construc3on
of
health
clinic
on
Albion
Street Charles
Greene
interior
stairs
replacement Windows
at
Harborview
Village
apartments Sec3on
504
site
and
common
area
infrastructure
rehabilita3on 755
Plaisades
Ave
clinic New
boilers
at
Fireside
Court
elderly
apartments ADA
renova3ons
to
stairways,
sidewalks,
parking
areas,
fencing,
etc. PT
Barnum
stairs
replacement New
boilers
at
536
Scafered
Site
units PT
Barnum
streets
and
sidewalks
replacement Kitchen
moderniza3ons
in
PT
Barnum,
Trumbull
Gardens,
Harborview,
and
CF
Greene Burroughs
Community
Center
Expansion
 Sec3on
504
unit
retrofit
in
all
projects Housing
Preserva3on
Projects‐
For
Owner
occupied
and
historic
district
proper3es.

Project
Descrip3on

Funding
Required 










1,500,000
 










1,500,000
 










1,500,000
 










4,650,775
 










1,600,000
 










2,071,561
 










3,000,000
 










2,300,000
 










2,754,800
 










3,500,000
 










3,098,920
 










3,200,000
 










3,500,000
 










3,750,000
 










3,000,000
 










4,128,104


Jobs 22 22 22 23 24 30 32 34 40 42 46 47 51 55 60 60

Bridgeport Bridgeport Bridgeport Bridgeport

CT CT CT CT

Public
Safety Public
Safety Public
Safety Public
Safety

Expansion
of
City's
Video
Monitoring
System Expansion
of
Emergency
Services
Unit City‐wide
Public
Safety
Mesh
Wireless
Network
 School
Resource
Officers
and
Neighborhood
Policing
Officers
to
Support
Community
Policing
Ini3a3ves












2,600,000
 










3,000,000
 










3,000,000
 










5,000,000


100 6 12 15

Bridgeport

CT

Schools

Replace
roofs
at
Bassick
High
School
and
the
Maintenance
Garage












22,500,000


90












2,400,000


Bridgeport

CT

Schools

20

Replace
plumbing
fixtures
and
mixing
valves
in
Winthrop,
Bassick,
Roosevelt,
Whiqer
schools.
















350,000


Bridgeport

CT

30

Schools

Columbus
energy
efficiency
renova3ons
to
include
Window
replacement
and
HVAC
upgrades















6,500,000


Bridgeport

50

CT

Schools












2,800,000


50

Bridgeport

CT

Schools












1,195,000


70

Bridgeport

CT

Schools












6,990,000


75

Bridgeport

CT

Schools

Bridgeport

CT

Schools

Upgrade
HVAC
System
to
include
energy
efficient
Boilers
and
air
handling
units.

Schools
include
Curiale,
 Central,
Whiqer,
Sheridan,
Marin,
Park
City,
JFK.

 Upgrade
electrical
systems
to
meet
current
Technology
requirements
within
the
schools.
School
include:
 Hallen,
Longfellow,
Madison
Harding
Wintrop,
Blackham,
Bearsdley,
Whiqer.

 Replace
Doors
and
Windows.

Exis3ng
Windows
and
doors
need
to
be
upgraded
to
thermopane
units
and
 replace
old
corroded
doors
at
Blackrock,
Blackham,
Beardsley,
Central,
Cross,
Harding,
Hallen,
Longfellow,
Park
 City,
Skane
and
Bassick
Schools

 Replace
Hea3ng
Controls
systems
in
Blackrock,
Beardsley,
Edison,
Hallen,
Blackham,
Hooker,
JFK
Campus
High
 Horizon,
Mul3
Cultural,
Read,
Roosevelt,
Whiqer
and
Wintrop
Schools Columbus
ADA
Renova3ons.

Renovate
and
exis3ng
Elementary
School
to
meet
ADA
Code
requirements

Bridgeport

CT

Schools

Bridgeport

CT

Schools

Bridgeport

CT

Schools

Bridgeport

CT

Streets/Roads

Auxiliary
Classrooms
at
Central
High
School
to
provide
addi3onal
teaching
space
to
meet
the
accredita3on
 issues
within
the
high
school.

This
project
would
provide
relief
from
the
exis3ng
over
crowding
situa3on
 Provide
local
funding
to
construct
a
Discovery
magnet
School.

This
facility
is
70,000
sf
with
500
students.

This
 school
will
operate
in
conjunc3on
witht
he
Discovery
Museum. Provide
local
funding
for
the
new
210,000
sf
Mul3
Magnet
High
School
to
aid
in
over
crowding
and
provide
a
 facility
that
is
environmentally
sound
and
matches
the
curriculum.

The
curriculum
includes
infroma3on
 Technology,
Zoology,
and
Aerospace
programs East
Washington
Bridge
Repair
Project
(Maintenance
Repairs)


Bridgeport

CT

Streets/Roads

Citywide
Traffic
Signal
Replacement
Project


Bridgeport

CT

Streets/Roads

Bridgeport

CT

Streets/Roads

Bridgeport

CT

Streets/Roads

Downtown/South
End
Streetscape
Connector:
Es3mated
cost:
$3,
527,444.70 This
project
incorporates
two
separate,
but
related
ini3a3ves
to
connect
the
South
End,
Arena,
Ballpark,
Ferry,
 Warnaco
Housing
and
future
High
Speed
Ferry
with
the
Downtown
Centr Neighborhood
Side
Walk/infrastructure
Improvement
Projects‐ Hollow/Madison
Av/
Street
Scape
Improvement
Project East
Side
Improvement
Project‐ West
Side
Street
Scape
Improvement
Project South
End
Iranistan
and
Street
improvements
 Bridgeport
City‐wide
Sidewalk
Reconstruc3on
and
Installa3on
Project


Bridgeport

CT

Streets/Roads

Bridgeport

CT

Bridgeport












4,000,000


75












8,850,000


300












2,750,000


400












3,050,000


600










12,300,000


850














130,000


8












5,900,000


20












3,527,444


40












8,500,000


43










22,000,000


50

Capital
Avenue
Bridge
Rehabilita3on













1,000,000


50

Streets/Roads

Main
Street
Streetscape
Phase
#1
Woodside
to
Trumbull
Mall













8,500,000


60

CT

Streets/Roads

Main
Street
Streetscape
Phase
#
2
&
3











10,000,000


66

Bridgeport

CT

Streets/Roads












4,500,000


88

Bridgeport

CT

Streets/Roads

Pleasure
Beach
Bridge
Demoli3on
(removal
of
disabled
bridge
to
establish
direct
water
transporta3on)
and
 Fishing
Pier
Construc3on
Project
(design‐phase
completed,
site
assembled,
project
planning
complete) Streetscape
Improvements
27A
Harbor
Yard













9,902,970


100

Bridgeport

CT

Streets/Roads

City
Wide
Bridge
Repair













5,000,000


250

Bridgeport

CT

Streets/Roads










50,000,000


400

Bridgeport

CT

Streets/Roads

Congress
Street
Bridge
Demoli3on
and
Re‐construc3on
Project
(design‐phase
completed,
project
planning
 complete)
–
Es3mated
Cost:
$50
million Roadway
(Strategic
City‐wide
Paving
Project)









160,000,000


600

Bridgeport

CT

Transit

Fare
Box
Replacement
(replacing
65
fare
boxes
for
increase
in
regional
fare
coordina3on












1,045,000


4

Bridgeport

CT

Transit












2,800,000


20

Bridgeport

CT

Transit

Transit
Authority
Bus
Emissions
Reduc3on
Project:

Re‐power
40
buses
to
solve
turbo
failure
problem
and
 reduce
vehicle
emissions Transit
Authority
Shelter
Installa3on
Project:

Install
100
shelters
at
bus
stops
–
50
replace
exis3ng
shelters,
50
 installed
at
stops
without
shelters












1,400,000


20

Bridgeport

CT

Transit

Transit
Garage
Expansion
Project












2,500,000


20

Bridgeport

CT

Transit












3,900,000


30

Bridgeport

CT

Transit












4,000,000


80

Bridgeport

CT

Transit

Transit
Authority
Bus
Terminal
Project:

Provide
addi3onal
protec3on
from
the
elements
on
the
plazorms
of
 the
new
bus
terminal Port
Authority
Ferry
Garage
Construc3on
Project
(Planned
phase
of
intermodal
transporta3on
center
project/
 transit
oriented
development
/
design‐phase
completed,
site
assembled,
project
planning
complete)
–
 Es3mated
Cost:
$4
million Transit
Authority
Maintenance
and
Administra3on
Facility
Project:
Expand
Administra3on
and
Maintenance
 Facility
to
accommodate
growth,
improve
efficiency,
improve
working
condi3ons
and
develop
into
a
 sustainable
facility
including
reducing
carbon
footprint










14,000,000


80

City

State

Program

Bridgeport

CT

Water

Project
Descrip3on

Bridgeport

CT

Water

Bridgeport

CT

Water

Bridgeport

CT

Water

Bridgeport

CT

Water

Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Danbury Enfield

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

CDBG CDBG CDBG CDBG Public
Safety Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water CDBG

Enfield

CT

CDBG

Enfield

CT

CDBG

Enfield

CT

CDBG

Enfield

CT

CDBG

Enfield

CT

CDBG

Enfield

CT

Energy

Enfield

CT

Energy

Enfield

CT

Public
Safety

Enfield

CT

Schools

Enfield

CT

Schools

Enfield

CT

Streets/Roads

Enfield

CT

Streets/Roads

Enfield

CT

Streets/Roads

Enfield

CT

Streets/Roads

Freshwater
Blvd.
and
Cranbrook
Blvd.
Intersec3on
Improvements.

Installa3on
of
improved
signaliza3on
and
 protected
leb
turn
lane
to
reduce
high
incidence
of
accidents. Hazardville
Avenue
(State
Route
190)
Sidewalk
Extension.

Installa3on
of
2500
feet
of
sidewalk
connec3ng
 shopping
areas
to
neighborhoods Parker
Street
Storm
Drainage
Improvements‐Reconstruc3on
of
the
undersized
Parker
Street
drainage
ouzall

Enfield

CT

Streets/Roads

Powder
Hill
Road
Drainage
Improvements‐Installa3on
of
a
drainage
system
to
avert
roadway
flooding
and
icing.

Enfield

CT

Streets/Roads

Enfield

CT

Streets/Roads

Enfield

CT

Transit

Enfield

CT

Water

Harzord

CT

CDBG

Harzord

CT

CDBG

Harzord

CT

CDBG

Meriden

CT

CDBG

Meriden

CT

CDBG

Road
2009
Street
Reconstruc3on.
Reconstruc3on
of
8
miles
of
local
streets
in
accordance
with
road
 management
system
plan Town
Farm
Road
Sidewalk‐Install
sidewalks
in
the
area
of
Town
Farm
Road
to
provide
safe
pedestrian
access
to
 Town
Residence. Transit
Center
Construc3on.

Redevelopment
of
former
site
of
train
sta3on
for
mul3‐modal
facilityalong
New
 Haven
to
Springfield
communter
rail
line Inflow
&
Infiltra3on‐Elimina3ng
the
Inflow
&
Infiltra3on
of
the
sanitary
sewers
in
the
Thompsonville
sec3on
of
 Town.

During
a
rain
event
the
effluent
treated
at
the
Water
Pollu3on
Control
Plant
increases
by
50%
 Harzord
has
begun
a
$50
million
dollar
project
to
upgrade
our
70‐year‐old
flood
control
system.
Harzord
 recently
completed
repairs
and
retained
our
Army
Corps
of
Engineers
cer3fica3on,
concluding
the
first
phase
 of
this
project.
 The
dilapidated
Capewell
horse
nail
factory
is
a
key
lynch
pin
for
development
in
the
area
around
Colt
Park.
At
 present
the
project
is
stalled
because
of
a
gap
in
funding
and
an
$8M
appropria3on
would
get
it
moving
again. Harzord’s
new,
state
of
the
art
public
safety
complex
will
house
the
Police,
Fire,
and
Emergency
response
 services
in
the
City.
It
will
protect
not
only
the
residents
of
Harzord,
but
will
also
serve
the
State
Capitol,
the
 State
and
Federal
Courts Construct
job
seeker
computer
center
at
Meriden
Public
Library.

Public/community
facility
serving
low
mod
 clients.

 Expand
downtown
WiFi
network.

Public
infrastructure
project
in
downtown/low
mod
income
area.



Meriden

CT

CDBG

Meriden

CT

CDBG

City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
Pump
Sta3on
 Upgrades/
design‐phase
completed,
project
planning
complete,
ini3al
work
underway) City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
/
design‐phase
 completed,
project
planning
complete,
ini3al
work
underway)
 Bridgeport
Harbor
Maintenance
Dredging Ox
Brook
Flood
Control
Project
(reconstruc3on
of
tributaries,
construc3on
of
new
channels,
installa3on
of
new
 berm
at
Elton
Rogers
Park
&
new
pipe)
 City‐wide
Sewer
Separa3on
Project
(Bridgeport
Water
Pollu3on
Control
Authority
WPCA)
/
study‐phase
 star3ng,

ini3al
tes3ng
underway) Educa3on
&
Resource
Center
‐
Candlewood
Lake Water
&
Sewer
Installa3ons
‐
Cornell
Road Regional
Solid
Waste
Treatment
Sta3on
‐
Acquis3on
and
expansion
of
exis3ng
sta3on Head
Start
of
Northern
Fairfield
County Radio
Communica3ons
System
Upgrade Replace
Boiler
‐
Danbury
High
School Replace
Roof
‐
Park
Avenue
School Science
Labs
Renova3ons
‐
Danbury
High
Schools Bridge
Rehabilita3on
‐
East
Franklin
Street Bridge
Replacement
‐
Backus
Avenue Bridge
Replacement
‐
Crosby
Street East
Ditch
Deainage
Phase
II Re‐alignment
&
Beau3fica3on
‐
Plumtrees
Road White
Street
Streetscape
(Phase
II
&
III) Drainage
Improvements
‐
Citywide West
Side
Interceptor
Sewer Angelo
Lamagna
Ac3vity
Center
Pool
Replacement‐Replacement
of
35
year
old
outdoor
public
swimming
pool
 located
in
community
revitaliza3on
area,
with
zero
depth
entry
pool. Higgins
School
Renova3ons‐Renova3on
of
former
school
building
to
house
child
development
center,
school
 administra3ve
offices,
and
classroom
space
for
the
community
college North
Main
Street
Streetscape
Improvements‐Streetscape
improvements
to
support
the
Revitaliza3on
of
 Thompsonville. Recrea3onal
Soccer
Fields
Expansion‐Construc3on
of
a
total
of
Six
(6)
Recrea3onal
Soccer
Fields




with
parking
 facili3es
by
expanding
to
two
(2)
new
loca3ons Strand
Theater
Renova3on‐Renova3on
of
vacant
and
deteriorated
1937‐built
theater
in
revitaliza3on
area
for
 community
performance
center. Village
Center
Exterior
Rehabilita3on‐Rehabilita3on
of
exterior
of
1890
building
Village
Center



located
in
 community
revitaliza3on
area.
 Enrico
Fermi
High
School
Hea3ng
&
Cooling
Plant
Energy
Efficiency
Conversion‐Conversion
of
Hea3ng
&
 Cooling
Plant
to
Energy
Efficient

System WPC
Co‐Genera3on‐To
up
grade
the
Town’s
Water
Pollu3on
Control
Facility
to
begin
genera3ng
our
own
 power
by
u3lizing
the
exis3ng
sludge Public
Safety
Communica3ons
System
Upgrade‐Replacement
of
Town‐wide
radio
system
with
trunked
system
 and
computer
aided
dispatch. Enfield
High
School
Fire
Line
Extension‐Extension
of
exterior
fire
line
to
replace
failed
line
under
building. Secondary
Schools
Parking
Lot
Improvements‐Reconstruc3on
of
the
three
secondary
school
parking
lots,
with
 improved
drainage
and
traffic
flow Beverly
Street
Reconstruc3on.

Reconstruc3on
of
Beverly
Street
including
sidewalks
and
drainage

Demolish
Blighted
Structures
at
84/88
Grove
Street.

Redevelop
area
as
public
parking.

Site
located
in
low
mod
 area.

 Demolish
two
blighted
structures
on
Miller
Street.

Redevelop
site
with
City‐owned
parking
area
to
serve
 Meriden
Public
Library
and
low
mod
clients.



Funding
Required

Jobs












5,000,000


40










12,000,000


75










10,000,000


80










45,000,000


400










42,000,000
 












500,000
 










3,000,000
 








30,000,000
 








10,000,000
 








10,000,000
 










1,500,000
 










1,000,000
 










3,000,000
 










2,000,000
 










1,000,000
 










1,400,000
 










1,300,000
 












445,000
 












500,000
 










3,000,000
 








14,000,000


600 20 20 50 100 30 10 20 70 20 20 20 20 20 20 30 40












1,800,000
 










7,000,000
 












250,000
 










1,400,000
 










3,500,000
 












400,000
 










1,400,000
 










9,500,000
 










6,500,000
 












350,000
 










1,000,000
 












250,000
 












352,000
 












150,000
 












100,000
 












200,000
 








13,500,000
 












450,000
 








10,000,000
 










1,100,000











16,000,000


250












8,000,000


500










21,000,000


1000
















50,000


3
















50,000


4














420,000


5














500,000


8

City

State

Program

Meriden

CT

CDBG

Replace
pool
at
Hubbard
Park.

Public/community
facility
serving
low
mod
clients.



Project
Descrip3on

Meriden

CT

CDBG

Meriden

CT

CDBG

Meriden

CT

Energy

Demolish
Blighted
Structures
at
City‐owned
Factory
H
Brownfields
Site.

Redevelop
site
as
mixed
use
area
and
 open
space.

Site
located
in
low
mod
area.
 Construct
needed
u3li3es
and
infrastructure
at
City‐owned
Meriden
HUB
brownfields
site.

Redevelop
site
as
 mixed
use
area
and
open
space.

Site
located
in
low
mod
area.
 Replace
windows,
hea3ng
and
HVAC
systems
at
City
Hall
for
energy
conserva3on.

Meriden

CT

Energy

Meriden

CT

Meriden

Funding
Required 










1,200,000


Jobs 9












3,700,000


65










10,000,000


200












1,000,000


4

Construct
Compressed
Natural
Gas
(CNG)
vehicle
fueling
sta3on
for
use
by
the
City
fleet.
















500,000


5

Energy

Install
backup
generator
for
use
by
Meriden
Public
Library,
Health
Department
and
Board
of
Educa3on.
















900,000


5

CT

Energy

Replace
windows
at
Augusta
Cur3s
Cultural
Center
for
energy
conserva3on.














225,000


5

Meriden

CT

Energy

Replace
windows,
hea3ng
and
HVAC
systems
at
Meriden
Public
Library
for
energy
conserva3on.














1,000,000


6

Meriden

CT

Energy












4,000,000


8

Meriden

CT

Energy












1,500,000


10

Meriden

CT

Energy

Install
two
400
kWh
Fuel
Cells
for
electricity
genera3on
to
be
used
by
the
City's
Water
Pollu3on
Control
Plant
 on
Evansville
Ave.

 Replace
windows,
hea3ng
and
HVAC
systems
at
Meriden
Health
Dept./Stoddard
Building
for
energy
 conserva3on. Replace
roof
and
install
solar
PV
array
for
building's
electricity
needs
at
Meriden
Parks
&
Recrea3on
building.
















750,000


12

Meriden

CT

Energy












3,000,000


14

Meriden

CT

Public
Safety
















55,000


3

Meriden

CT

Public
Safety
















70,000


3

Meriden

CT

Public
Safety












3,200,000


3

Meriden

CT

Public
Safety

Install
security
cameras
and
internet
communica3ons
at
Meriden
Health
Center
located
in
the
Stoddard
 Building. Purchase
two‐site
simulcast
and
dispatch
communica3ons
equipment
for
City's
Emergency
Opera3ons
Center
 and
Police
Dispatch.

 Purchase
new
servers,
network
equipment,
electrical
and
data
cables
for
Police
Department
Data
Center.


















60,000


5

Meriden

CT

Public
Safety

Install
high‐speed
Fiber
SONET
Ring
network
to
allow
for
networking
among
City
buildings.
















600,000


6

Meriden

CT

Public
Safety

Construct
Impound/Evidence
Storage
Facility
at
City
transfer
facility
to
house
and
process
impound
evidence.














800,000


10

Meriden

CT

Public
Safety












5,909,000


20

Meriden

CT

Public
Safety

Renovate
Fire
Sta3ons
4,
5,
2
and
3
to
address
ongoing
maintence
problems,
environmental
issues,
code
 issues,
and
outdated
hea3ng
systems.


Install
Access
Control
System
in
all
5
City
Fire
Sta3ons Construct
addi3on
to
Police
Department
headquarters
to
accommodate
community
police
program.












5,500,000


30

Meriden

CT

Schools












5,500,000


9

Meriden

CT

Schools

Replace
pools
at
City
High
Schools
to
meet
State
law.

Incoporate
renewable
energy
technologies
in
pool
 reconstruc3on. Construct
building
addi3on
at
Hanover
Elementary
School
to
accommodate
all‐day
kindergarden.












5,500,000


40

Meriden

CT

Streets/Roads














300,000


4

Meriden

CT

Streets/Roads

Install
new
signals
on
West
Main
and
Bradley,
and
on
Lewis
and
Springdate
to
mi3gate
traffic
conges3on
at
 those
intersec3ons. Construct
City‐owned
parking
lot
at
Colony
and
Church.

Lot
will
serve
Central
Business
District.
















200,000


6

Meriden

CT

Streets/Roads

Construct
new
retaining
wall
to
replace
deteriora3ng
wall
on
Prospect
Street.














750,000


6

Meriden

CT

Streets/Roads

Locate
and
enter
in
all
water,
sewer
and
drainage
as‐built
infrastructure
into
City
GIS
database.















750,000


6

Meriden

CT

Streets/Roads

Repair/Construct
sidewalks
on
Broad
Street
from
I‐691
to
East
Main
Street.














750,000


6

Meriden

CT

Streets/Roads














750,000


6

Meriden

CT

Streets/Roads

Repair/Construct
sidewalks
on
Oregon
Road
from
Wilcox
Technical
School
to
Quinnipiac
River
Watershed
 Associa3on
Building.

 Construct
drainage
system
behind
homes
off
Boylson
and
Maple
St.














250,000


8

Meriden

CT

Streets/Roads

Complete
Olive
Street
Reconstruc3on
between
Elm
Street
and
Broad
Street.














475,000


10

Meriden

CT

Streets/Roads

Construct
Hazmat
Storage
Building
at
DPW
complex.














400,000


10

Meriden

CT

Streets/Roads

Improve
drainage
on
Cheshire/New
Cheshire
Roads
to
eliminate
icing
problem.












1,000,000


10

Meriden

CT

Streets/Roads

Install
new
sidewalks
and
drainage
on
Cur3s
Street.













1,000,000


10

Meriden

CT

Streets/Roads

Complete
annual
sidewalk
contruc3on
and
repair
of
exis3ng
sidewalks.














500,000


12

Meriden

CT

Streets/Roads

Reconstruct
southerly
por3on
of
Finch
Ave.













1,150,000


12

Meriden

CT

Streets/Roads

Replace
damaged
guiderails
citywide.
















150,000


12

Meriden

CT

Streets/Roads

Complete
annual
street
paving
and
road
repairs.














2,000,000


14

Meriden

CT

Streets/Roads












1,000,000


15

Meriden

CT

Streets/Roads

Repair
sidewalks,
curbing
and
crosswalks
in
Central
Business
District.

Reinvest
in
prior
streetscape
 expenditures
by
City. Reconstruct
5
miles
of
public
roads
in
City‐owned
Hubbard
Park.














2,000,000


18

Meriden

CT

Water

Construct
Hea3ng
Sytem
at
Broad
Brook
Treatment
Plant.














400,000


5

Meriden

CT

Water
















90,000


5

Meriden

CT

Water

Design‐build
electrical
upgrades
to
Plaf
and
Lincoln
wells.

Project
consists
of
replacing
all
outdated
electrical
 equipment
with
code‐compliant
equipment. Complete
sewer
rehabilia3on
from
Griswold
Street
to
Center
Street.
Project
includes
relining
sanitary
sewers.














100,000


6

Meriden

CT

Water

Remove
24"
sanitary
sewer
from
Hanover
Pond.
















500,000


6

Meriden

CT

Water

Meriden

CT

Water

Design‐build
sanitary
sewer
replacement
from
Oakland
Gardens
to
Griswold
Street.

Project
will
address
sewer
 overflows
at
Jack
Barry
Field. Upgrade
28‐
year
old
Silver
Lake
Pump
Sta3on.

Upgrades
include
all
mechanical
and
electrical
equipment.



Meriden

CT

Water

Meriden

CT

Water

Meriden

CT

Water

Middletown

CT

CDBG

Middletown

CT

CDBG

Middletown

CT

CDBG

Middletown

CT

Energy

Replace
windows,
hea3ng
and
HVAC
systems
and
other
exterior
improvements
at
DPW
Facility
located
at
 Michael
Drive
for
energy
conserva3on. Install
emergency
electrical
generator
at
South
Meriden
Volunteer
Fire
Department.

Clean
cement
lining
of
all
iron
water
mains
in
City
Water
Department
system.

Project
includes
replacement
of
 all
valves
and
hydrants.

 Complete
sewer
rehabilia3on
in
sub‐basin
17.

Project
includes
relining
sanitary
sewers,
structural
spot
repairs,
 and
rebuilding
manhole
covers
in
City
Water
Department
system.

 Design‐build
Broad
Brook
Pump
Sta3on
Upgrade
and
Rehabilia3on.

Project
consists
of
upgrading
pumps,
 motors,
motor
control
panel,
pipine
and
other
structures. Aqusi3on,
demoli3on
and
reloca3on
of
blighted
neighborhood.
Implementa3on
of
fully
approved
 Redevelopment
Plan. Northend
Homeownership
Project.
Completly
designed
and
approved.
Crea3on
of
17
units
of
affordable
 housing
in
low
to
mod
census
tract. Comple3on
of
8
soccer
fields,
to
include
2
24/7
lighted
turf
fields.
Land
acquired,
fully
approved
site
work
 underway. Use
of
landfill
gas,
solar
panels
and
other
forms
of
alternate
energy
to
provide
heat
and
electricity
to
city
 owned
184,000
sq.b.
brownfield
building
constructed
in
1894.














500,000


8












1,000,000


12












2,500,000


20












2,500,000


20












1,920,000


20












3,500,000


100












2,500,000


100












4,000,000


150












5,000,000


200

City

State

Program

Middletown

CT

Streets/Roads

Middletown

CT

Water

Middletown

CT

Water

Naugatuck Naugatuck Naugatuck Naugatuck Naugatuck Naugatuck Naugatuck

CT CT CT CT CT CT CT

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Naugatuck Naugatuck

CT CT

CDBG Streets/Roads

Naugatuck Naugatuck Naugatuck New
Haven

CT CT CT CT

Streets/Roads Streets/Roads Streets/Roads CDBG

New
Haven

CT

CDBG

New
Haven New
Haven New
Haven

CT CT CT

CDBG CDBG CDBG

New
Haven

CT

Energy

New
Haven

CT

Energy

New
Haven

CT

Energy

New
Haven

CT

Schools

New
Haven

CT

Schools

New
Haven

CT

Streets/Roads

New
Haven

CT

Streets/Roads

New
Haven

CT

Streets/Roads

New
Haven

CT

Streets/Roads

New
Haven

CT

Streets/Roads

New
Haven

CT

Streets/Roads

New
Haven

CT

Water

Norwalk Norwalk Norwalk Norwalk

CT CT CT CT

CDBG CDBG CDBG CDBG

Norwalk

CT

CDBG

Norwalk

CT

CDBG

Norwalk

CT

Norwalk

Project
Descrip3on Construc3on
of
city
parking
lot. 280
spaces
plans
complete,
bid
in
Feb.
09 Straighten
Country
Club
Road.
Designed
to
eliminate
2
very
bad
curves. Mafabasset
Regionaliza3on.
Abandon
1970's
sewage
plant
on
CT
River
and
3e
into
modern
sewage
plant
2
 miles
to
north. Fawn
Meadow
Park
Irriga3on Town
Wide
Park
Safety
Improvements City
Hill
Field
Ligh3ng
Project Renova3on
and
Irriga3on
and
Ligh3ng
Cross
Street
School Construc3on
of
Gunntown
Park,
design
complete
all
approvals
in
place Sanitary
Sewer
Rehabilita3on
 Brown
Field

Remedia3on
for
Renaissance
Downtown
Economic
Revitaliza3on
Project,
Project
currently
being
 rebid
over
budget Building
Renova3ons
To
Charles
Goodyear
Cultural
Center
(Building
25) Reconstruc3on
of
Historic
Town
Brick
Paver
Road,
Last
Brick
Road
in
Town,

Survey
complete
/30
%Design
 Town
Wide
Paving
Program Rubber
Ave
Bridge
#03713 Replacement
of
Town
wide
Sidewalks,
exis3ng
bid
in
place
 Brewery
Square
Seawall
Reconstruc3on:

the
seawall
is
badly
deteriora3ng
and
needs
reconstruc3on.

The
park
 walkway
is
washing
away.

Steel
Sheetpilings
must
be
patched
and
concrete
backing
must
be
poured Dover
Beach
Seawall:
Complete
repairs
to
the
sec3on
of
the
seawall
located
at
Dover
Beach
Park Eastshore
Park
Erosion
Control
Phase
II Bowen
Field:

Improvements
to
fields,
track,
bleachers,
restrooms
and
ADA
compliance River
Street
Industrial
Park.

1.
MDP
Phase
II:
Sidewalk/Street
improvements,
ligh3ng/signal
work.

2.
 Brownfields:

Environmental
remedia3on
of
soils
and
factory
buildings.

3.

Waterfront:
Construct
 bulkheads/walkway/park Wind
Turbine
at
Sound
School:

A
750kW
wind
turbine
at
the
Sound
School
Voca3onal
Aquaculture
Center
 would
fulfill
all
of
the
facility's
electrical
needs,
crea3ng
ongoing
savings
of
approximately
$300,000
per
year Central
U3lity
Plant
and
Fuel
Cell:

U3lity
Plant
that
will
provide
mechanical
/
electrical
services
for
new
schools
 ‐
Hill
Central
and
Clemente
School
‐
inclusion
of
Fuel
Cell
for
minimizing
peak
demands District‐wide
High
Performance
and
Sustainable
Energy
Efficiency
Improvements:

Improve
energy
efficiency
 and
sustainability
for
various
school
buildings
with
low
e
glass
installa3on
and
high
performance
energy
 management
system
upgrades
(including
upgra District‐wide
code
compliance
and
accessibility
upgrades:

ADA
accessibility
upgrade
for
civil
rights
compliance
 at
several
schools,
including
restrooms,
counters,
ramps,
elevators,
labs,
signage,
doors
and
swimming
pools. Davis
Street
School:

Abate
and
demolish
the
exis3ng
Davis
Street
School
and
construct
a
new
pre‐K‐8
school
in
 its
place.

New
school
building
would
use
highest
quality
energy
efficiency
measures Downtown
/
Medical
District
Conges3on
Management
Program:

Replacement
of
12
traffic
signals
in
/
around
 Yale
New
Haven
Hospital
and
the
Yale
Medical
District Major
Arterial
Rehabilita3on:

Mill
and
pave
Congress
Avenue
from
Davenport
Avenue
to
North
of
Ward
Street Crown
Street
Renova3on
Program:

Structural
repairs,
waterproofing,
electrical
work,
mechanical,
plumbing,
 signage,
elevator,
etc.
associated
with
a
complete
state‐of‐good‐repair
reconstruc3on. Prospect
Street
Bridge
Replacement:

Replace
bridge,
signaliza3on
and
approaches
‐
bridge
in
"poor"
 condi3on. Quinnipiac
Avenue
Phase
I:

Road
reconstruc3on
and
Traffic
Calming State
Street
Bridge:
Replace
the
bridge
carrying
State
Street
over
the
Mill
River.

Bridge
is
in
"cri3cal"
condi3on
 according
to
CT‐DOT
inspec3ons District‐wide
Paving
and
Drainage
Water
Conserva3on
Measures:

Drainage
and
erosion
control,
including
use
 of
gray
water
for
irriga3on
systems,
water
deten3on
cisterns,
pervious
pavement
for
parking
areas
and
 retaining
walls Installa3on
of
a
City
Hall
emergency
generator Pain3ng
and
repair
of
the
City
Hall
cupola City
Hall
roof
replacement
 Construc3on
project:
renova3on
of
the
City
Hall
data
center.
This
project
will
completely
modernize



and
bring
 up
to
building
and
safety
code
the
20+
year
old
data
center.
This
project
will
create
jobs
for
local
labor
–
 electricians,
plumbers,
architects,
etc. Demoli3on
of
the
old
police
sta3on

Funding
Required

Jobs














750,000


40












6,000,000


100










25,000,000
 












100,000
 












150,000
 












200,000
 












250,000
 












400,000
 










1,600,000


300 2 4 5 6 11 41














750,000
 










1,665,000


51 60














800,000
 












750,000
 












300,000
 










1,500,000


19 24 28 36












1,000,000


10














715,000
 












700,000
 








15,000,000


10 10 65












8,200,000


125












2,600,000


20












6,500,000


65










20,000,000


225












8,000,000


85










48,000,000


500












3,000,000
 












440,000


15












5,700,000


25












3,500,000


25












7,000,000


70












7,600,000


76












6,000,000
 












700,000
 












150,000
 










1,590,000


65 6 6 15














700,000


20












2,775,000


20












1,500,000


20

CDBG

Renova3on
and
repair
of
the
Health
Department
building:
new
windows,
new
roof,
handicapped
access,
 interior
light
fixtures. Structural
Repairs
SoNo
Railroad
Sta3on
garage













1,200,000


27

CT

CDBG

Norwalk
River
Valley
Trail













1,500,000


30

Norwalk

CT

CDBG

Structural
repairs
to
Yankee
Doodle
Garage













1,800,000


40

Norwalk

CT

CDBG














400,000


50

Norwalk

CT

CDBG












2,500,000


80

Norwalk

CT

CDBG












3,500,000


200

Norwalk

CT

CDBG












3,000,000


200

Norwalk

CT

Housing












1,250,000


20

Norwalk

CT

Housing

Fodor
Farm
Main
Farm
House:
Restora3on
of
an
18th
Century
Farm
House
as
centerpiece
of
a
sustainable
 property
including
orchards
and
community
gardens,
educa3on
center. The
Lockwood
Mafhews
Mansion
Museum
needs
new
mechanical
and
electrical
systems,
an
HVAC
system
 upgrade,
ligh3ng
and
fire
safety
systems,
and
an
elevator.
Thermal
wells
and
a
poten3al
solar
hea3ng
system
 are
being
considered
to
support
energy
needs. Calf
Pasture
Beach:
crea3ng
a
Visitors
Center
and
gateway
to
Norwalk’s
islands
and
waterfront.

Adap3ve
Re‐ use
of
exis3ng
structure. Oyster
Shell
Park:
A
former
landfill
turned
into
a
Riverfront
Park
offering
the
latest
green
technology.

Key
 walkways
connec3ng
area
afrac3ons.
Phase
II
and
III, Washington
Village
energy
efficient
hea3ng
plant
and
site
infrastructure
improvements.
Keeps
136
families
 effec3vely
housed
in
affordable
units.

 Roodner
Court
windows
and
weatheriza3on
‐
Keeps
218
families
effec3vely
housed
in
affordable
units.























1,570,000


22

City

State

Program

Project
Descrip3on

Norwalk

CT

Housing

Norwalk

CT

Schools

Norwalk Norwalk Norwalk Norwalk Norwalk

CT CT CT CT CT

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Norwalk Norwalk Norwalk Norwalk

CT CT CT CT

Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Norwalk

CT

Streets/Roads


Colonial
Village
Energy
Conserva3on
and
Family
Resource
Center
–
Includes

energy

efficient
windows
and
 storm
doors.
Family
Resource
Center
will



combine
aberschool
program,
childcare,
arts
and
family
self‐ sufficiency
programs.












 Repair
and
modernize
10
schools,
including
such
ac3vi3es
as
replacing
exterior
windows,
emergency
ligh3ng,
 exterior
doors
and
frames,
boilers
and
burners,
roofs,
PA
systems,
fire
alarm
systems,
emergency
ligh3ng,
 installing
new
DDC,
ABS/EMS Westmere
Bridge
replacement

 Removal
of
Old
Tokeneke
Bridge

 Route
1
Widening
project
 Perry
Avenue
Bridge
replacement

 Replacement
of
six
traffic
signals:
Belden
Ave
@
Cross
St;
Belden
Ave
@
Rte
7;
Van
Zant
St
@
Fire
House;
Van
 Zant
St
@
Osborne;
Fox
Run
and
Ward
St
@
Freese
Court Cedar
Street
Improvements
 Fairfield
Avenue
Reconstruc3on Strawberry
Hill
Traffic
Calming
 Renova3on
of
the
urban
core
(approx.
30
acre
site)
infrastructure
to
include
pedestrian‐friendly
sidewalks,
 ligh3ng,
roadway
construc3on
&
u3lty
reloca3on 65
centerline
miles
of
roadway
paving

Funding
Required

Jobs

Norwalk

CT

Water

Mary
Aus3n
at
Silvermine
Avenue
Drainage
Installa3on
[ready]

Norwalk

CT

Water












1,000,000


25

Norwalk

CT

Water

Olmstead
Place,
Noah’s
Lane,
Meadowbrook
Drainage
improvement
package
(bids
received,
contractor
 selected) Buckingham‐Lockwood
Drainage
Improvement
Project












4,000,000


100

Norwalk

CT

Water

Keeler
Brook
Drainage
Improvement
Project
[in
design]












9,000,000


200

Norwalk

CT

Water

Wastewater
Treatment
Plant
Upgrade,
Phase
I

Norwich Norwich

CT CT

CDBG CDBG

Brownfield
Waterfront
Cleanup
for
26
Shipping
Street.

The
City‐owned
brownfield
is
in
a
waterfront
area
with
 Dog
Pound.

Approved
project
to
break
ground
in
March.










45,000,000
 












500,000


500 19














800,000


25

Norwich

CT

CDBG














500,000


40

Norwich

CT

CDBG












3,000,000


350

Norwich

CT

Streets/Roads












5,500,000


15

Norwich

CT

Streets/Roads












1,500,000


15

Norwich

CT

Water

Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Housing Housing Housing Housing Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

Norwich
Harbor
Sea
Wall
Project.

This
project
is
under
construc3on,
however
there
are
plans
ready
to
go
to
 convert
from
sheet
steel
pilings
to
prefabricated
concrete
block
for
final
phase
at
Harbor
on
Thames
River.
This
 change
was
unforeseen
and
was
req Norwich
Hospital
Site
Remedia3on.
Environmental
remedia3on
of
60
acre
Norwich
State
Hospital
site
in
the
 southeastern
sec3on
of
the
City
(Laurel
Hill
sec3on)
for
future
development
on
site
to
create
jobs,
(both
 construc3on
and
new
enterprise
outlets) City
of
Norwich
Road
Construc3on
project
plans
and
specifica3ons
are
complete
for
15
miles
of
qualifying
 federal
aid
streets.

Work
includes
both
milling
and
paving
of
exis3ng
roads.
Contract
award
and
construc3on
 can
take
place
within
60
days
of
fund City
of
Norwich
Sidewalk
Construc3on
project
includes
4
miles
of
sidewalks
along
several
State
Highways
 where
no
sidewalk
exists.
Since
the
opening
of
the
casinos
in
adjacent
communi3es,
pedestrian
traffic
has
 increased
drama3cally,
primarily
by
casino Norwich
Public
U3li3es
Wastewater
Facili3es
Upgrade
project.

The
first
phase,
installa3on
of
equipment
that
 will
improve
the
ability
of
the
plant
to
process
waste
and
allow
the
plant
to
become
basically
energy
 independent
is
an
es3mated
$8
Million
e Old
Town
Hall
Boiler
Replacement Veteran's
Park
Ligh3ng Rosa
Hartman
Park
Renova3on Hatch
Park
Renova3on Cummings
Park
Pier
&
Pavilion Kosciuszko
Park
Plan3ng Rogers
School
Renova3on Scalzi
Park
Upgrade Mill
River
Park
Beferments,
I‐95
to
Main
St. Mill
River
Park
Beferments,
South
of
I‐95 Fuel
Cell
Absorbsion
Chiller Citywide
Street
Ligh3ng
Infrastructure
Upgrade Dolan
Middle
School
Windows
and
Doors Historical
Society
Windows
and
HVAC Turn
of
River
Windows Waste
To
Energy
Biomass
Gassificasion
Energy
Produc3on Roof
Replacement
at
Stamford
Manor. Brick
and
concrete
repair
and
replacement
at
Stamford
Manor. Security
Improvements
at
Stamford
Manor. Quintard
Manor
Rehabilita3on Clinton
Manor
Rehabilita3on Progress
Drive
Apartments Provide
training
for
foreign
languages
classes
for
Police
Officers Purchase
plate
reading
vehicles
to
assist
in
Homeland
Security
programs Emergency
response
team
for
Homeland
Security
(Training
and
start
up) Street
mentoring
for
street
violence/work
with
youth
groups/gangs Purchase
Biological/chemical
tes3ng
equipment
to
improve
forensic
capabili3es Train
7
K‐9's DNA
capable
Forensic
Unit Combine
a
Task
Force
approach
for
Juvenile
Jus3ce
w/Child
Guidance,
proba3on,
social
agencies












8,000,000
 












250,000
 












100,000
 












225,000
 










1,100,000
 












700,000
 












500,000
 










5,000,000
 










5,000,000
 








20,000,000
 








35,000,000
 










4,000,000
 










4,680,000
 










2,000,000
 










2,000,000
 










1,500,000
 








50,000,000
 












375,000
 












300,000
 












500,000
 










4,500,000
 










8,150,000
 








13,700,000
 














48,000
 












104,000
 












124,000
 












200,000
 












450,000
 












164,000
 












850,000


30 3 3 6 10 12 12 40 45 100 100 8 11 20 20 20 75 25 35 40 70 90 230 1 1 2 4 6 7 8

Stamford Stamford Stamford Stamford Stamford Stamford Stamford

CT CT CT CT CT CT CT

Public
Safety Public
Safety Schools Schools Schools Schools Schools

Safe
street/
Neighborhood
Task
Force
walking
patrols Police
Cadet
(Trainee
program) District
Wide
Electrical District
Wide
Technology
Infrastructure Energy
Conserva3on
Projects Davenport
Code/Renova3on District
Wide
Boiler
Projects














600,000
 










1,280,000
 














80,000
 








15,000,000
 








10,000,000
 








15,000,000
 










8,600,000
 








10,000,000


10 16 20 15 15 15 20 20










10,400,000


68












7,808,651
 












200,000
 












400,000
 












450,000
 












700,000


166 5 10 10 16












1,500,000
 










1,500,000
 










7,000,000
 










7,000,000


25 35 75 75










43,000,000


200










25,000,000


220














350,000


15

City

State

Program

Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Stamford Strazord

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Water Water Water Water CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

CDBG

Strazord

CT

Energy

Strazord

CT

Housing

Strazord

CT

Schools

Strazord

CT

Streets/Roads

Project
Descrip3on Cloonan
Renova3ons District
Wide
Paving Rippowam
Center
Code/Renova3ons Westhill
High
School
Mechanical
Upgrade Boyle
Stadium
Renova3on Northeast
Code/Renova3on Modular
Classroom
Replacement System
Wide
Roofing District
Wide
Turf
Field South
End
Charter
School Springdale
Expansion/Renova3ons System
Wide
Code
Compliance
Projects System
Wide
IAQ
Projects Stamford
High
School Long
Ridge
Road
intersec3on
improvements School
zone
flashers
implementa3on Bridge
recondi3oning/railing
replacements Citywide
op3cal
fire
pre‐emp3on
installa3on Corn
Cake
Lane
roadway
improvement Emergency
back
up
power
for
traffic
signals Laurel
Road
roadway
improvement Skymeadow
Drive
roadway
improvement Spring
Street
reconstruc3on Cold
Spring
Rd.
Bridge
Rehab Atlan3c
Street
streetscape
sidewalk
replacement Guard
rails
improvements Hope
Street
paving Bedford
Street
streetscape
sidewalk
replacement Citywide
paving Oaklawn
Avenue
roadway
reconstruc3on Turn
of
River
Road
Roadway
reconstruc3on Richmond
Hill
Avenue
bridge
replacement Implementa3on
of
traffic
calming
plan Greenwich
Ave.
Improvements Security
Cameras
at
Municipal
Parking
Garages Commuter
rail
parking
improvements Stamford
Urban
Transitway
Phase
1 Signal
hardware
upgrade
citywide Stamford
Urban
Transitway
‐
Phase
2 Intervale
Sewers Carriage
Drive
Sewers Perna
Lane
Sewers Wedgemere
Road
Sewers Perry
House
Historic
Preserva3on
Project:
Improvements
and
addi3ons
to
one
of
the
oldest
homesteads
in
the
 United
States;
part
of
larger
community
and
road
improvement
project
to
this
area
coming
off
from
Interstate
 95. Town
Residen3al
Rehabilita3on
Program
(RRP):
Recapitaliza3on
of
program
to
fund
backlog
of
applicants
for
 home
improvement/code
compliance
work
in
low‐mod
income
areas
of
Strazord.
 Birdseye
&
Strazord
Academy
Field
Improvements
to
athle3c
fields
for
two
recrea3on
sites.

Work
includes
 new
community
sports
facili3es,
an
1,800
foot
walking
track
and
addi3onal
parking
spaces.
 Boothe
Memorial
Park
Improvements
and
Restora3ons: Various
historical
restora3on/preserva3on
projects
in
town
park. Greenway
Project‐
Railroad
to
Short
Beach Crea3on
of
publically‐accessible
greenway
from
Strazord
Center/Rail
Sta3on
to
Short
Beach.

Path
to
be
 located
on
Town
property
and
exis3ng
rights‐of‐way. Short
Beach
Park
Improvements:
Improvement
projects
to
facili3es
at
Short
Beach
Park,
including
sand
 restora3on,
replacement
and
upgrading
of
bleachers,
sports
field
restora3on,
parking
lot
resurfacing,
code‐ related
playground
renova3ons. Sidewalk
Replacement
Projects: Combina3on
of
low
&
moderate‐income
neighborhoods
targeted
for
new
sidewalk
installa3on
and
sidewalk
 replacements.

 Municipal
Building
Capital
Upgrades:
including
roof
repair
and
replacement,
Police
Department
building
 improvements,
Town
Hall
ADA
compliance
work. Renova3ons
to
New
Site
for
Emergency
Medical
Services
(EMS):Project
is
100%
design
and
permit‐ready;
will
 renovate
old
Strazord
Fire
Sta3on
house
to
accommodate
Town’s
EMS
fleet
and
offices.

Project
will
include
 energy
efficiency
components. Long
Beach
West
Cofage
Demoli3on
and
Improvements: Removal
of
45
cofages
on
coastal
property;
includes
demoli3on,
hazardous
waste
remedia3on,
restora3on
of
 natural
habitat,
&
access
improvement. Municipal
Building
Generator
Replacements: Replacement/retrofiqng
of
old
and
energy‐inefficient
generators
at
Police
Sta3on,
Strazord
Town
Hall
and
 Bunnell
High
School.

 Strazord
Housing
Authority‐Public
Housing
Roofing
Projects:
Total
of
thirteen
(13)
new
roofs
at
Shiloh
Gardens
 and
Lucas
Gardens
public
housing
developments.

 School
Capital
Improvement
Projects
at
15
school
buildings
throughout
the
system.

Includes
window
and
 panel
replacement
to
improve
building
energy
efficiency,
roof
and
masonry
repair,
ADA
code
compliance. Barnum
Avenue
Streetscape
Project:
Project
encompasses
work
on
both
sides
of
approximately
1,500
linear
 feet
of
Barnum
Ave
(US
Rte
1).
Includes
construc3on
of
street/traffic
improvements,
storm
water
drainage
 collec3on
system
upgrades,
landscaping.



Funding
Required Jobs 








14,000,000
 25 








10,000,000
 25 










8,500,000
 25 








15,000,000
 25 










3,500,000
 30 








12,500,000
 40 








20,000,000
 50 








15,000,000
 50 








15,000,000
 100 








15,000,000
 100 








15,000,000
 100 








20,000,000
 100 








50,000,000
 100 








31,000,000
 150 












300,000
 3 












200,000
 3 












155,000
 4 












750,000
 4 














85,000
 4 












250,000
 4 












100,000
 4 












250,000
 6 












250,000
 6 










2,000,000
 7 










1,000,000
 8 












127,000
 8 










1,000,000
 8 










2,000,000
 10 










3,500,000
 12 










3,000,000
 15 










8,000,000
 15 










4,000,000
 20 










3,000,000
 60 










6,000,000
 100 












330,000
 4 










3,000,000
 10 








10,000,000
 20 








25,000,000
 60 








54,000,000
 100 










5,500,000
 30 










6,000,000
 60 










5,000,000
 60 










4,000,000
 60














350,000


20














150,000


20












1,200,000


25












1,000,000


30












2,400,000


30












1,300,000


30












1,000,000


30














500,000


35












2,150,000


45












5,000,000


500














600,000


12














150,000


30












3,491,000


70












2,000,000


30

City

State

Program

Strazord

CT

Streets/Roads

Strazord

CT

Water

Strazord

CT

Water

Waterbury

CT

CDBG

Waterbury

CT

CDBG

Waterbury

CT

CDBG

Waterbury

CT

CDBG

Waterbury

CT

CDBG

Waterbury

CT

Schools

Waterbury

CT

Transit

West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Harzord West
Haven West
Haven West
Haven

CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT CT

CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Housing Public
Safety Public
Safety Public
Safety Schools Schools Schools Streets/Roads Streets/Roads CDBG CDBG Public
Safety

West
Haven

CT

Public
Safety

West
Haven

CT

Public
Safety

West
Haven

CT

Public
Safety

West
Haven

CT

Public
Safety

West
Haven

CT

Public
Safety

West
Haven West
Haven Washington Washington Washington Washington Washington Washington Washington Washington Wilmington Wilmington Wilmington Wilmington Wilmington Wilmington Wilmington Boynton
Beach

CT CT DC DC DC DC DC DC DC DC DE DE DE DE DE DE DE FL

Streets/Roads Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG CDBG Energy Energy Energy Energy Water CDBG

Project
Descrip3on Project
First
Impression‐West
Broad
Street/I95
Interchange
32
ramps Streetscape,
curb
reconstruc3on,
pedestrian
enhancements
and
road
resurfacing
work
to
improve
entry
into
 Historic
Strazord
Center
from
I95
at
Exit
32.

 WPCA
Stormwater/Sanita3on
Projects
Crew Create
a
new
four‐person
crew
dedicated
solely
to
the
backlog
of
bonded
storm
water
projects
that
will
help
 the
Town
in
mee3ng
new
requirements
for
storm
water
management
permit
for
the
CT
DEP.

 King
Street
Culvert:
Project
would
alleviate
chronic
flooding
problems
in
heavy
commercial
area
of
town.

Two
 loca3ons
along
King
Street
in
would
be
the
subject
of
the
project‐
West
Broad
Street
and
Main
St
(Rte113).

 Cherry
Street
Industrial
Park
remedia3on
to
add
to
industrial
site
inventory
in
an3cipa3on
of
immediate
 business
expansion. Mafatuck
Manufacturing
environmental
remedia3on
to
prepare
8‐acre
site
for
immediate
development. State‐of‐the‐art
environmental
technology
are
planned
for
a
30,000‐square
foot
expansion
of
the
Silas
Bronson
 Library. The
renova3on
of
historic
City
Hall
will
modernize
city
business
prac3ces
and
jump
start
downtown
 development. Waterbury
Industrial
Commons
remedica3on
and
construc3on
project
to
develop
a
consolidated
Public
Works
 campus
and
add
to
industrial
pad
site
inventory. Construc3on
of
two
K‐8
elementary
schools
in
CDBG
eligible
census
tracts
as
part
of
a
wider
neighborhood
 revitaliza3on Mul3‐Modal
Transporta3on
Center
on
Meadow
Street
to
provide
enhanced
bus,
tax
and
train
transporta3on
 for
the
region. Community
Center
Improvements Sewer
improvements Sidewalk
replacement Economic
development
streetscape Handicap
accessibility Housing
Rehab. Street
reconstruc3on Vehicle
replacement Boiler
Replacement
schools School
window
replacemnt Fuel
Cell
installa3on
rink/pool Street
light
led
upgrade Expansion
of
senior
housing
complex Addi3onal
personel public
safety
equipment fire
sta3on
replacement school
fire
safety
improvements School
ven3la3on
improvements school
fiber
op3c
improvements Arterial
Street
Reconstruc3on Street
pedestrian
safety
improvements Public
beach
restora3on
project Streetscaping
‐
Route
1
Boston
Post
Road;
Campbell
Avenue;
Main
Street Addi3onal
School
Resource
Officers
assigned
to
public
schools.
The
Schoool
Resource
Officer
Program
has
been
 very
successful
in
the
upper
grades
and
would
be
successful
if
we
implement
a
SRO
assigned
exclusively
to
the
 lower
grades
for
con3nuity Implement
"hot
spot"
monitoring
of
high
crime
area
throughout
our
City
through
the
use
of
video
monitoring.
 This
will
allow
us
to
befer
allocate
resources
and
have
real‐3me
informa3on
on
suspected
criminal
ac3vity. Provide
addi3onal
crime
preven3on
and
quality
of
life
officers.
These
proac3ve
programs
were
either
 substan3ally
curtailed
or
eliminated
due
to
the
lack
of
Federal
funding
the
past
several
years.
 Enhance
police/fire
radio
system
to
fully
fuc3onalize
geographical
area
coverage
and
provide
enhanced
 interoperabiity
between
Police
&
Fire
and
between
Regional
inter‐departmental

response
teams. Establish
gang/gun
task
force
to
focus
on
these
serious
issues
facing
our
neighborhoods.
Since
these
monies
 (programs)
were
eliminated
some
years
ago,
we
have
seen
a
steady
decline
in
the
quality
of
life
in
our
 neighborhoods. 1.
Addi3onal
School
Resource
Officers
assigned
to
public
schools. 2.
Establish
gang/gun
task
force
to
focus
on
these
issues
facing
our
neighborhoods. Replacement
of
three
culverts Water
Pollu3on
Control
Plant
Upgrade 11th
Street
Bridge
Ramp
Demoli3on 14th
Street
Bridge
Rehabilita3on 16th
Street
NW
over
Military
Road
Rehabilita3on 31st
Bridge
NW
over
C&O
Canal Columbia
Heights
Improvements New
York
Avenue
Bridge New
York
Avenue/Florida
Avenue
Intersec3on South
Dakota‐Riggs
Road
Upgrade Sidewalk
Repairs Street
Paving Energy
Conserva3on
Measures
in
City
buildings Trafic
and
Street
Light
Retrofits Energy
Conserva3on
Measures
in
Water/Wastewater
Facili3es Solar
Photovoltaic
Installa3ons Water
Distribu3on
Main
Replacement
(30
miles) Hester
and
Pence
Parks
Ligh3ng/Field
Retrofit
‐
Conversion
of
exis3ng
natural
turf
ball
fields
to
synthe3c
turf
 and
conversion
of
ball
field
ligh3ng
to
computer
controlled
ligh3ng
for
energy
conserva3on,
thereby
 elimina3ng
the
use
of
chemicals

Funding
Required

Jobs












1,500,000


35














600,000


4












3,000,000


35














600,000


15














500,000


35










19,000,000


75










25,000,000


300










10,000,000


300










70,000,000


200










28,000,000
 










1,000,000
 












800,000
 












500,000
 










1,000,000
 










1,000,000
 












500,000
 










2,000,000
 












400,000
 










2,750,000
 










1,700,000
 










3,000,000
 










4,500,000
 








20,000,000
 










1,000,000
 










2,500,000
 








10,500,000
 










2,200,000
 










2,400,000
 










3,500,000
 










3,000,000
 










2,500,000
 












800,000
 










3,000,000


150 40 40 40 50 50 50 50 10 50 50 90 100 300 10 50 200 75 80 85 40 50 10 25
















75,000


1
















55,000


1














150,000


2














215,000


4














300,000


4














625,000
 










3,500,000
 








62,000,000
 










8,000,000
 








14,100,000
 










5,000,000
 










5,000,000
 










8,000,000
 








40,000,000
 










8,000,000
 










3,600,000
 












500,000
 










2,000,000
 










1,000,000
 










1,500,000
 










5,000,000
 








12,000,000
 








30,000,000


5 20 50












1,600,000


10

4 10 2 3 12 20 33

City

State

Program

Boynton
Beach

FL

CDBG

Project
Descrip3on

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

CDBG

Boynton
Beach

FL

Water

Boynton
Beach

FL

Water

Boynton
Beach

FL

Water

Boynton
Beach

FL

Water

Boynton
Beach

FL

Water

Cape
Coral Cape
Coral Cape
Coral

FL FL FL

CDBG CDBG CDBG

Cape
Coral

FL

CDBG

Cape
Coral Cape
Coral Cape
Coral Cape
Coral

FL FL FL FL

Energy Energy Energy Public
Safety

Cape
Coral Cape
Coral Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Clearwater Cocoa
Beach

FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads CDBG CDBG CDBG Water Water Water Water Water Water Water Water CDBG

Cocoa
Beach

FL

CDBG

Cocoa
Beach

FL

CDBG

Cocoa
Beach

FL

Energy

Cocoa
Beach

FL

Public
Safety

Cocoa
Beach

FL

Public
Safety

Cocoa
Beach

FL

Streets/Roads

Equipment
Storage
building
‐ solar
powered/LEED

cer3fied Intended
to
extend
vehicle
life by
corrosion
reduc3on Vehicle
storage
building
‐
 solar
powered/LEED

cer3fied Intended
to
extend
vehicle
life by
corrosion
reduc3on Administra3on
facility solar
powered/LEED

cer3fied energy‐efficient
ligh3ng (property
acquired/needs
assessment
study
done) )(must
receive
funding
early
2009
to
complete
by
end
of
2010) Install
solar
power
grid.

Provide
power
to
some
City
facili3es
&
sell
remainder
to
grid.
(Installa3on
areas
 iden3fied
&
available) Construct
Fire
Sta3on
#
2 solar
powered/LEED

cer3fied energy‐efficient
ligh3ng
(property
acquired/needs
assessment
done))(must
receive
funding
early
2009
to
 complete
by
end
of
2010) Public
Safety
(combined
police/fire)
facility,solar
powered/LEED

cer3fied
energy‐efficient
ligh3ng (property
acquired/needs
assessment
done)(must
receive
funding
early
2009
to
complete
by
end
of
2010) Asphalt
rejuvina3on
‐
City‐wide
project
to
extend
life
of
exis3ng
paving

Cocoa
Beach

FL

Streets/Roads

Cocoa
Beach

FL

Streets/Roads

Funding
Required

Municipal
Grounds
Landscape
Retrofit
‐
Upgrade
landscaping
to
replace
large
turf
areas
with
na3ve
plan3ngs
 to
reduce
reliance
on
potable
water
supplies.

Project
would
also
result
in
the
reduc3on
of
fer3lizer/chemical
 










1,000,000
 applica3ons Oceanfront
Park
Boardwalk
Replacement
‐
U3lizing
a
renewable
wood
source
this
project
calls
for
the
 replacement
of
approximately
900
linear
feet
of
oceanfront
boardwalk.

The
exis3ng
boardwalk
has
failed
and
 










2,400,000
 is
presen3ng
a
hazard
to
beach
patrons.
 Quantum
Eco
Park
‐
Development
of
an
"eco"
park
using
LEEDS
or
other
"green"
design
principals.

Ameni3es
 to
include
trails
through
natural
areas,
nature
center
for
environmental
educa3on,
interpre3ve
exhibits,
rock
 










4,500,000
 garden,
buferfly
garden,
botanical
garden
 Seacrest
&
MLK,
Jr.
Blvd.
Recconstruc3on
‐
improve
sec3ons
of
low‐income
minority
community
to
increase
 safety,
encourage
redevelopment
and
improve
quality
of
life.

Includes
new
ligh3ng,
crosswalks,
wider
 










5,500,000
 sidewalks,
landscaping,
pavers
and
traffic
circle Boynton
Harbor
Public
Marina
‐

Redesign
to
improve
boat
slips,
construct
public
walkways,
ligh3ng,
signage,
 landscaping
and
public
art.

Design
elements
conserve
water
and
electricity.
Catalyst
project
for
county
water
 










6,500,000
 transit
system. Congress
Ave.
Community
Park
‐
Construc3on
of
a
13
acre
barrier‐free
community
park
including
a
4,000
to
 










8,900,000
 8,000
sq.b.
therapeu3c
recrea3on
building
built
to
LEEDS
or
Florida
Green
Building
Coali3on
Standards.
 New
Police
Facility
‐
The
Na3onally
accredited
Boynton
Beach
Police
Department
currently
opera3ng
in
an
 18,000
sq.
b.
building.

Recent
space
analysis
found
the
need
for
81,000
sq.
b.

Experiencing
increased
public
 








31,000,000
 demand
for
police
services.

 Perimeter
Protec3on
and
Surveillance
Entry
No3fica3on
‐
Security
improvements
for
water
treatment
and
 












227,670
 other
u3li3es
facili3es Stormwater
Improvement
and
Water
Main
Replacement‐NW
17th
Ave.
‐
Potable
water
main
installa3on
and
 










3,234,000
 stormwater
improvements Stormwater
Improvement
‐
SE
4th
Street/SE
Federal
Hwy
Corridor
‐
Roadway
improvements,
potable
water
 










5,020,792
 main
installa3on,
stormwater
and
reclaimed
water
improvements Phase
I
New
Force
Main
from
East
Plant
Site
to
Regional
Plant,
new
force
main
LS
at
SE
6th
Ave.,
new
LS
at
SE
 6th
Ave.
‐
New
regional
sewage
force
main
and
pumping
sta3on
to
provide
future
capacity
and
redundancy
of
 










6,320,000
 cri3cal
infrastructure Stormwater
Management/Swale
Improvements
at
Seacrest
Corridor‐Potable
water
main
replacement
and
 










7,529,597
 stormwater
improvements 










2,800,000
 Construct
perimeter
walls
around
new
reverse
osmosis
and
water
reclama3on
facili3es 








10,000,000
 Sidewalks
and
curbing
program‐
retrofit
4
lane
divided
roadways Chiquita
Boatlock‐construct
boat
lock
to
facilitate
state
requirements
for
clean
waterway
on
the
south
spreader
 








13,000,000
 waterway U3lity
Expansion
Program,
Provide
public
water,
sewer
and
wastewater
recycle
to
replace
well
and
sep3c‐Sw
 






345,400,000
 6/7area,
Noth
1
through
8
areas
and
facility
expamsion
project 










7,500,000
 ASR
Treatment
System‐Treatment
for
alterna3ve
storage
and
recovery
wells 










2,600,000
 Everest
Odor
Control‐upgrade
of
odor
control
system
at
the
water
reclama3on
facility 










9,200,000
 environmental
building
construc3on 












800,000
 North
Cape
Guard
House‐
install
guard
house
for
homeland
security
feature
at
Reverse
Osmosis
water
plant 








10,000,000
 Citywide
roadway
maintenance‐resurfacing
of
deteriora3ng
road
surfaces 








60,000,000
 Chiquita
Boulevard
Widening‐widen
roadway
from
4
to
6
lanes 










1,800,000
 Fort
Harrison
Avenue/Pinellas
Street
Intersec3on
Improvements 












250,000
 Keene
Road/Druid
Road
mast
arm 












250,000
 Municipal
Services
Building
Parking
Lot 












150,000
 Air
Release
Valve
Reloca3ons 










2,600,000
 Lake
Bellevue
Stormwater
Expansion 










2,800,000
 Marshall
Street
&
Northeast
Treatment
Plants
Centrifuge
Dewatering 










1,300,000
 Marshall
Street
and
East
Treatment
Plants
Hypochlorite
Conversion 










1,600,000
 Marshall
Street
Treatment
Plant
Generator
Modifica3ons 










2,200,000
 Northeast
Treatment
Plant
Secondary
Digester
Improvements 












600,000
 Overlea
&
Stevenson
Drives
Sanitary
Improvements 












820,000
 Pump
Sta3on
65
Force
Main
Reroute

Jobs

15

50

50

60

75 100

300 3 43 67

84 100 20 36 100 1359 20 20 80 20 36 436
















50,000


5














150,000


10












8,000,000


50














500,000


10












2,000,000


70










12,000,000


100














350,000


10

Comple3on
of
Sidewalk
/Bike
Path
Master
Plan














150,000


10

Slipline/replace
stormwater
lines 10,000
b.
@
$40/linear
foot














400,000


10

City

State

Program

Cocoa
Beach

FL

Streets/Roads

Cocoa
Beach

FL

Streets/Roads

Cocoa
Beach

FL

Streets/Roads

Cocoa
Beach

FL

Water

Cocoa
Beach

FL

Water

Cocoa
Beach

FL

Water

Cocoa
Beach

FL

Water

Cocoa
Beach

FL

Water

Cocoa
Beach

FL

Water

Coconut
Creek

FL

Public
Safety

SR
520
Landscaping
&
Irriga3on
‐ Intended
to
aid
in
controlling
runoff
to Indian
River
lagoon Re‐
line
500
manholes 8
b.
depth
@
$250/b. Ocean
Beach
Blvd. use
na3ve
plants/energy‐efficient
ligh3ng.
Intended
to
aid
in
controlling
runoff
to
Indian
River
lagoon.
(design
 phase
complete) Infiltra3on
&
Inflow
Assessment
‐
 Comprehensive
survey
of
system
to
priori3ze
work
required Rebuild
and/or
replace
 six
(6)
high
service
pumps (Equipment
iden3fied
&
replacements
specified) Engineering
evalua3on
of
ASR
site
at
PAFB. Construct
500,000
GPD
irriga3on
system. Lib
Sta3on
#
4
Conversion
‐ Major
upgrade
to
"wet
pit"
status Sewer
System
Rehabilita3on
‐
 Rehabilita3on
of
systems
serving
 Lib
Sta3ons
#4,
#6
&
#7 (Specific
upgrades
required
are
iden3fied) Improvements
to
six
(6)
process
systems: (1)
Influent
Handling
Facili3es (2)
Biological
Treatment
Units (3)
Clarifiers
(4)
Filters
(5)
Chlorine
contact
 (6)
Residuals
Handling (Study
&
preliminary
cos3ng
done) 4
New
Police
Officers
for
growth
in
city
and
current
crime
trends

Project
Descrip3on

Coconut
Creek

FL

Streets/Roads

State
Road
7
Median
and
Roadway
Enhancements
to
reduce
conges3on
and
improve
air
quality

Coconut
Creek

FL

Streets/Roads

Coconut
Creek

FL

Streets/Roads

Coconut
Creek

FL

Streets/Roads

Coconut
Creek

FL

Transit

Lyons
Road
Construc3on
Improvements
Phase
III
‐
which
includes
transporta3on/pedestrian
and
 environmental
enhancements Lyons
Road
Construc3on
Improvements
Phase
IV
‐
which
includes
transporta3on/pedestrain
and
 environmental
enhancements Coconut
Creek
Parkway
Educa3on
Corridor
(both
phases)
‐
Construc3on/Enhancements
of
exis3ng
highway
 linking
five
educa3onal
ins3tu3ons
including
numerous
pedestrian
and
transit
features Construc3on
of
New
Bus
Shelters
to
expand
public
transit

Coconut
Creek

FL

Water

Coconut
Creek

FL

Water

Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Gables Coral
Springs

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Water Water Water CDBG

Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs

FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG Energy Public
Safety Public
Safety Public
Safety Schools Schools

Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs Coral
Springs

FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Water Water Water

Reclaimed
Water
Line
Extension
along
Copans
Road
to
conserve
potable
water
from
Biscayne
Aquifer
linked
to
 the
Everglades
and
eliminate
effluent
discharge
into
Atlan3c
Ocean Reclaimed
Water
Line
Extension
along
Wiles
Road
to
conserve
potable
water
from
Biscayne
Aquifer
linked
to
 the
Everglades
and
eliminate
effluent
discharge
into
Atlan3c
Ocean Heat/Cooling
Systems
for
City
owned
proper3es Energy
Management
for
City
owned
proper3es Natural
Gas
Pipeline
for
City
Maintenance
Facility Storm
Drainage
Const. Pavement
Resurfacing,
Bridge
Improvements,
Traffic
Calming
and
Sidewalk
Extensions Conveyance
Improvements
to
C‐3
Canal
(Dredging) Ponce
de
Leon
Boulevard
Phase
II
and
Phase
III
Improvements Miracle
Mile
Streetscape Bus
Route
Expansion Maint.
Facility
Upgrade New
Transit
Buses Force
Main
Replacement Mainline
Rehabilita3on Pump
Sta3on
Upgrades Traffic
Calming:
Traffic
calming
is
a
tool
for
the
City
to
help
improve
the
livability
of
neighborhoods
by
reducing
 speeding
and
cut
through
traffic.
Funds
will
be
used
to
install
permanent
speed
humps
in
eligible
 neighborhoods. Repair
City
Hall
Roof Build
Neighborhood
Transit
Center
and
Parking
Garage Implement
Sample
Road
and
University
Drive
Infrastructure
Master
Plan Replace
Althle3c
Field
Ligh3ng
With
Energy
Efficient
Fixtures In‐Car
Digital
Camera
System
for
Police
Patrol
Vehicles Mobile
Command
Unit Northwest
County
Communica3ons
Center
Emergency
Communic3on
Equipment
Upgrade Charter
School
Informa3on
Technology
Upgrade Coral
Springs
Charter
School
Roof
Replacement:
replace
exis3ng
roof
with
high
reflec3ve
"green"
coa3ng
 material
and
higher
RD
insula3on
to
substan3ally
reduce
solar
heat
gain
and
cooling
load of
HVAC
equipment,
saving
electrical
energy. Coral
Hills
Drive
Drainage
Improvements Meadows
and
Dells
Neighborhood
Drainage
Improvement
Project Roadway
Resurfacing
Program 20
Passenger
Bus
with
Lib
to
Transport
Seniors West
Side
Master
Plan
‐
expand
and
modernize
vehicle
repair
facility Bus
Shelter
Installa3on Inflow
and
Infiltra3on
Correc3on
Program Lib
Sta3on
Rehabilita3on
Program Water
Plant
Security
Wall

Funding
Required

Jobs














250,000


10












1,000,000


20












2,000,000


50














500,000


5














250,000


10














750,000


20














400,000


20












3,000,000


20










10,938,000


50














450,000


4












1,000,000


30












1,000,000


60












1,500,000


60












9,000,000


200














250,000


10












1,500,000


25












1,000,000
 














40,000
 












250,000
 












300,000
 










2,000,000
 










3,500,000
 










7,000,000
 










6,000,000
 










9,500,000
 












150,000
 












200,000
 










1,600,000
 










2,000,000
 










3,000,000
 










4,000,000


30 2 8 10 20 35 60 60 95 3 5 15 18 25 40
















50,000
 












400,000
 










6,000,000
 










4,000,000
 












500,000
 












150,000
 












200,000
 










6,000,000
 












250,000


1 8 80 80 2 0 0 40 1












2,500,000
 












127,000
 












750,000
 










1,825,000
 












100,000
 












300,000
 












120,000
 












700,000
 












980,000
 












400,000


40 10 10 20 0 2 5 10 10 10

City

State

Program

Coral
Springs

FL

Water

Coral
Springs Coral
Springs Coral
Springs Coral
Springs Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Doral Dunedin Dunedin Dunedin Dunedin Fort
Lauderdale

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG

Fort
Lauderdale

FL

CDBG

Fort
Lauderdale

FL

CDBG

Fort
Lauderdale

FL

CDBG

Fort
Lauderdale

FL

CDBG

Fort
Lauderdale

FL

CDBG

Fort
Lauderdale

FL

Public
Safety

Fort
Lauderdale

FL

Public
Safety

Fort
Lauderdale

FL

Public
Safety

Fort
Lauderdale

FL

Public
Safety

Fort
Lauderdale

FL

Streets/Roads

Fort
Lauderdale

FL

Streets/Roads

Fort
Lauderdale

FL

Streets/Roads

Fort
Lauderdale

FL

Streets/Roads

Project
Descrip3on Conserve
water
and
protect
drinking
water
source
from
chemical
run
off
by
replacing
athle3c
fields
with
 ar3ficial
turf Galvanized
Water
Service
Replacement
Program Water
Distribu3on
System
Improvements New
Raw
Water
Supply
Wells,
Wellheads
&
Transmission
System Water
Treatment
Plant
Improvements NW
107
Ave
Landscaping
improvements Interstate
27/NW
41
Street:
sidewalks
repair/improvements
and
crea3on
of
bikeway Public
Works
Department
Building City
wide
Bikeway Recrea3on
Center Police
Building City
Hall Municipal
Charter
School New
Infrastructure
of
a
public
park,
includes
reclaimed
water
use Community
Based
programs:
DARE,
GREAT,
RadKids
and
Police
Exxplorers City‐Wide
Closed
Circuit
Video
System NW
33
St
‐
104‐105
Ave.
Resurfacing NW
112
Ave
25‐34
St:
Resurfacing NW
109
Ave
42‐43
St.
New
Street
Construc3on NW
112
Ave
80St
‐
81
St.
New
Street
Construc3on NW
79
Ave

25‐58 NW
33
Street
92‐97
Ave

New
Street
Construc3on NW
41
St
79‐87 NW
102
Ave
66‐74 Trolley:
purchase
of
two
City
Trolleys
to
alleviate
traffic
and
reduce
emmisions Water
and
Wastewater
Main
installa3on
NW
114Ave Pinehurst
Road
Reconstruc3on
(between
SR
580
&
San
Christopher
Drive) Michigan
Blvd.
Reconstruc3on
(between
County
Road
One
&
US
Alternate
19) Pinehurst
Road
Reconstruc3on
(between
San
Christopher
Drive
&
Michigan
Blvd.) San
Christopher
Drive
Reconstruc3on
(between
County
Road
One
&
US
Alternate
19) Melrose
Park
‐
Security
Ligh3ng
 In
September
2002,
Melrose
Park,
a
small
residen3al
community
west
of
the
City,
was annexed
into
the
City
of
Fort
Lauderdale.
Within
a
one
mile
radius
of
Melrose
Park, there
are
7,114
residents
of
which
2,605
are
youths Flagler
Drive
Greenway The
greenway
will
run
along
the
two
west
lanes
of
Flagler
Drive
from
East
Sunrise
Blvd.
to
North
Andrews
Ave. Osswald
Park
‐
Recrea3on
Amenity
Improvements
 Osswald
Park
is
a
30‐acre
community
park
located
in
the
Rock
Island
neighborhood.
It was
annexed
by
the
City
of
Fort
Lauderdale
in
November
2005
and
is
one
of
the
City’s busiest
parks.
The
recrea3on
amen Renova3on
of
South
Side
Cultural
Community
Center
 This
request
is
for
funding
to
complete
the
renova3on
of
the
Federal
Historic designated
South
Side
School
building
as
a
Cultural
Community
Center.
The
design for
the
building
is
complete
 Melrose
Park
Community
Center
 This
is
a
funding
request
for
$2
million
to
meet
the
needs
of
this
recently
annexed youth
oriented
community
by
providing
a
new
community
recrea3on
center,
security
and site
ligh3ng
and
parking.
 Summer
Youth
Program
 The
City
of
Fort
Lauderdale
is
interested
in
expanding
its
Summer
Youth
Employment Program
to
provide
posi3ve
experien3al
workplace
learning
opportuni3es
for
addi3onal
area
teens
during
the
 summer
months.
 Electronic
Traffic
Cita3on
Process
 This
project
would
implement
electronic
versions
of
traffic
cita3ons.
On
January
10, 2005,
the
City
was
advised
that
the
Broward
County
courts
would
now
accept
electronic versions
of
traffic
cita3ons. This
request
is
to
provide
funding
for
three
(3)
large
solar‐powered
traffic
message board
signs
for
our
Patrol
Districts
and
one
(1)
mini‐message
board
sign
to
replace
an exis3ng
sign.
Solar
traffic
message
board
signs
have
the
capability
of
communica Police
Digital
In‐Car
Video
Cameras/Technology
Packages
 Two
hundred
and
sixty
nine
(269)
of
the
City
of
Fort
Lauderdale
Police
Department’s marked
police
vehicles
are
being
equipped
with
digital
in‐car
video cameras/technology
packages.
One
hundred
 Interoperable
Communica3ons
Upgrade/P25
Compliance
 Funding
requested
for
this
project
will
enhance
the
present
radio
system
that
serves
all City
of
Fort
Lauderdale
opera3ons,
including
its
Fire‐Rescue,
Police,
and
Public
Works departments,
as
well
a SW
11
Avenue
Swing
Bridge
Rehab‐
Rehabilita3on
of
a
Warren
Pony
steel
truss
bridge
constructed
around
 1924 ADA
Sidewalk
and
Beach
Erosion
Protec3on
Improvement:
The
exis3ng
sidewalk
and
wall
have
severely
 deteriorated
resul3ng
in
a
non‐ADA
compliant
walkway
and
limited
protec3on
from
sand
erosion.

 Replacement
of
the
wall
and
sidewalk
will
bring
the
lot
in Dorsey
Riverbend
Neighborhood
Improvement
and
Traffic
Calming:
Neighborhood
enhancement
through
a
 traffic
claiming
strategy
for
safety
and
economic
growth
in
Northwest
Fort
Lauderdale. NW
Neighborhood
Improvements
neighborhood
pedestrian
and
safety
improvement
project
to
consist
of
 improvements
to
the
sidewalk
and
pedestrian
access,
ligh3ng
and
landscaping
improvements
with
in
the
Durrs
 and
Home
Beau3ful
Park
neighborhood
for
safety,


Funding
Required

Jobs












1,500,000
 










1,000,000
 












900,000
 










2,500,000
 










3,500,000
 












900,000
 










1,800,000
 










3,000,000
 










6,000,000
 










5,000,000
 










8,000,000
 








15,000,000
 








10,000,000
 








30,000,000
 












330,000
 










1,000,000
 














62,500
 














20,000
 












350,000
 












350,000
 












750,000
 










2,000,000
 










2,000,000
 










3,000,000
 












350,000
 












150,000
 












500,000
 










1,800,000
 










2,000,000
 










1,800,000


12 20 20 25 25 30 60 100 200 225 275 500 500 1000 5 6 2 5 11 11 50 65 67 100 4 1.5 18 24 24 24














500,000


2














700,000


5














700,000


10












4,000,000


10












2,000,000


15














300,000


100














592,200


0
















93,600


0












1,500,000


5










30,000,000


20












6,000,000


10












3,400,000


20












2,000,000


20












4,000,000


20

City

State

Program

Fort
Lauderdale

FL

Streets/Roads

Many
of
the
City's
48
bridges
are
func3onally
obsolete
or
structurally
deficient.

Repair
of
bridges

Project
Descrip3on

Funding
Required 










2,000,000


Jobs 50

Fort
Lauderdale

FL

Streets/Roads

Fort
Lauderdale

FL

Streets/Roads

Many
of
the
City's
48
bridges
are
func3onally
obsolete
or
structurally
deficient.

Replacement
of
bridges










12,000,000


50

NE/NW
6
Street
(Sistrunk
Blvd)
Streetscape
and
Enhancement
Project:
An
infrastructure,
streetscape
 enhancement
and
a
community
redevelopment
project
with
the
main
objec3ve
of
improving
the
quality
of
life
 and
s3mula3ng
economic
growth
and
redevelopment Regularly
scheduled
road
resurfacing
will
prevent
further
deteriora3on
of
City’s
roadway
system.

Fort
Lauderdale

FL

Streets/Roads












4,000,000


50

Fort
Lauderdale

FL

Water










11,000,000


50

Fort
Lauderdale

FL

Water












3,135,000


6

Fort
Lauderdale

FL

Water












3,300,000


8

Fort
Lauderdale

FL

Water














800,000


8

Fort
Lauderdale

FL

Water












3,000,000


8

Fort
Lauderdale

FL

Water












1,200,000


10

Fort
Lauderdale

FL

Water














830,000


15

Fort
Lauderdale

FL

Water












4,500,000


20

Fort
Lauderdale

FL

Water










13,000,000


25

Fort
Myers

FL

CDBG












1,300,000


30

Fort
Myers

FL

Streets/Roads










25,340,000


460

Fort
Myers

FL

Water










44,175,000


731

Gretna Gretna Gretna Gretna Gretna Gretna Hallandale
Beach

FL FL FL FL FL FL FL

CDBG CDBG Public
Safety Public
Safety Streets/Roads Water CDBG








213,738,000
 










4,538,000
 










4,510,000
 










1,000,000
 












140,512
 










2,373,800
 










1,000,000


2167 50 101 3 3 10 3

Hallandale
Beach

FL

CDBG














700,000


7

Hallandale
Beach

FL

CDBG












2,000,000


20

Hallandale
Beach

FL

CDBG












1,000,000


20

Hallandale
Beach

FL

Streets/Roads












2,000,000


25

Hallandale
Beach

FL

Water












1,500,000


10












3,000,000


10

Forcemain
and
Water
Main
Improvements
‐
City‐Wide
System
Interconnects:
This
project
includes
comple3on
 of
7
cri3cal
interconnects
required
to
change‐over
from
older
transmission
systems
to
recently
constructed
 systems
in
order
to
address
capacity
 Contracted
Sewer
System
Rehabilita3on
(Re‐lining)
‐
2010:
These
projects
include
the
re‐lining
of
sanitary
 sewers
in
areas
iden3fied
as
having
high
levels
of
infiltra3on
and
inflow
(I&I),
and
where
the
effect
of
the
 improvements
can
be
monitored
and
th Water
Main
Improvements
‐
SE
1
Ave
and
SW
7
Ave
River
Crossings:

Two
cri3cal
water
main
crossings
of
the
 New
River
at
SE
1
Ave
and
SW
7
Ave
are
in
need
of
replacement,
the
crossing
at
SE
1
Ave
has
recently
failed
 and
is
out
of
service.
 Water
Storage
and
Transmission
Improvements
‐
NW
2
Ave
Tank
and
High
Service
Pump
Sta3on:
This
project
 includes
improvements
to
an
exis3ng
1.0
million
gallon
elevated
storage
tank
and
pump
sta3on,
including
 repairs,
cleaning,
and
pain3ng
of
the
tank;
 Stormwater
Improvements:
Installing
underground
stormwater
collec3on
system
will
assist
in
allevia3ng
 localized
flooding
and
will
create
safe
environment
for
residents. Water
Main
Improvements
‐
Imperial
Point
Phase
II
–
NE
56
St
between
N.
Andrews
Ave.
and
NE
9
Ave:
This
 project
includes
comple3on
of
a
cri3cal
16‐inch
water
transmission
main
necessary
to
meet
water
demands
in
 the
northeast
sec3on
of
the
City.
 Water
Main
Improvements
‐
South
Andrews
Ave:
This
project
includes
construc3on
of
15,000
linear
feet
of
 water
main
to
replace
a
failing
transmission
main
and
replace
it
with
a
larger
water
main,
and
to
replace
old
 and
undersized
distribu3on
mains
 Fiveash
Water
Treatment
Plant
Upgrades
‐
Phase
II:
Water
supply
constraints
have
resulted
in
extended
and
 increased
reliance
on
the
City’s
Fiveash
Water
Treatment
Plant
(WTP),
resul3ng
in
the
need
to
implement
 weather‐proofing
and
storm
hardening
improvements Water
Main
Improvements
‐
North
Andrews
Ave:
This
project
includes
replacement
of
4,800
linear
to
replace
 an
old
and
failing
transmission
main
and
replace
and
upsize
it
provide
adequate
and
reliable
water
supply
to
 the
downtown
Fort
Lauderdale
water
district Citywide
ADA
Compliance
Renova3ons Hurricane
Protec3on
of
Selected
City
Facili3es Clemente
Park Citywide
Drainage
Rehab/Drainage
Improvements Dean
Park
Neighborhood
Improvements Manuels
Branch
Watershed
Drainage
Improvements Brookhill
Subdivision Street
Overlay
Program Citywide
New
Sidewalk
Installa3on Sidewalk
Replacement
Program Hanson
St.
Ext/Cocos‐Or3z
Ave McGregor/Virginia
Ave
Roundabout Edison
Ave
Realign/Virginia‐Cleveland‐Cortez Veronica
Shoemaker
Blvd.
Sidewalk/Canal
Imp SR80
Acc Odor
Control
Equipment
CWWTP Injec3on
Well‐DEP
Requirement
CWWTP Reclaimed
Water
Produc3on
100%
CWWTP Reuse
Facility
at
South
Plant
SWWTP Injec3on
Well‐DEP
Requirement
SWWTP Odor
Control
Upgrade
SWWTP U3lity
Reloca3on
‐
Colonial
Widening
East
o Highway
12
Water
and
Sewer
Line
Extension Bofle
Water
with
recyclable
bofles Gretna
On
Wi‐Fi
Installa3on
of
City
Wide
Broadband Project
Ramp
Up
Expansion
of
Public
Safety
Services Project
‐
GO
Widening
of
Roads
and
Installa3on
of
Side
Walk Project
Reclaim
It
Effec3ve
Use
of
Treated
Wastewater Atlan3c
Shores
Blvd.
Water
Quality
and
Drainage
Improvements For
three
years
the
City
has
sought
unsuccessfully
to
obtain
funding
for
this
project,
which
will
have
the
dual
 benefit
of
improving
drainage
and
stormwater
quality.

The
project
entails
a
seg Northeast
Quadrant
Drainage
Improvements The
City’s
Northeast
Quadrant
has
been

subject
to
repe33ve
flooding
and
is
in
need
of
extensive
drainage
 improvements.
This
project
is
designed
to
greatly
mi3gate
the
flooding.

It
will
include
both
installa3 Subaqueous
Forcemain
Crossing
(Intracoastal) In
order
to
protect
against
poten3al
failure
of
a
very
old
forcemain
and
in
order
to
accommodate
future
 growth,one
subaqueous
20”
forcemain
measuring
approximately
9,500
feet
must
be
installed. Subaqueous
Water
Main
Crossings
(Intracoastal) In
order
to
meet
current
needs
and
accommodate
future
growth,
two
subaqueous
16”
water
mains
must
be
 installed.
The
combined
total
length
of
the
crossings
is
approximately
1,000
feet.

An
addi3onal
6,500
fe NE
8th
and
10th
Ave.
Two‐way
Conversion In
order
to
meet
the
traffic
needs
of
the
community,
the
City
is
planning
to
convert
these
two
on‐way
streets
 into
two‐way
streets.

Both
streets
are
approximately
4,000
feet
in
length. Reloca3on
of
City
Produc3on
Wells Because
of
the
destruc3ve
effects
of
saltwater
intrusion,
the
City
has
lost
most
of
its
produc3on
wells.

 reloca3on
of
wells
is
required
to
ensure
the
City’s
future
water
supply.

It
is
an3cipated
the
new
wells
wil

City

State

Program

Hallandale
Beach

FL

Water

Hallandale
Beach

FL

Water

Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hialeah Hollywood Hollywood Hollywood

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Amtrak CDBG CDBG CDBG CDBG Energy Energy Housing Public
Safety Public
Safety Public
Safety Public
Safety Schools Streets/Roads Transit Water Energy Energy Energy

Water
Main
Replacement Undersized
water
mains
throughout
the
City
need
to
be
replaced
by
larger
ones.

The
total
length
requiring
 replacement
is
approximately
20,000
feet. Water
Treatment
Plant
Expansion The
City
has
completed
the
first
pahse
of
a
water
treatment
plant
and
the
design
and
infrastructure
is
in
place
 to
add
addi3onal
capacity
of
nine
million
addi3onal
gallons
of
treated
water.
 One
Amtrak
Sta3on

Hialeah
Upgrades/
Roadway
access
improvements Neighborhood
Center

Construc3on Police
Sub
Sta3on Roadway
Improvements/Infrastructure Job
Training Public
Facili3es

Energy
efficient
re‐
design/green
compliance Vehicle
Conversion/
UpgradeFleet
(hybrid,
propane,
Flex

fuel) City

Owned

Housing Domes3c
Violence
preven3on Police

Cops Byrne
/
Technology

Upgrades Vehicle
Purchase/
Equipment Charter
school
Development Street
Infrastructure Purchase
of

energy
efficient
buses Reverse
Osmosis
Plant Energy
Efficient
Upgrades
to
City
Facili3es Streetlight
Replacement
to
Energy
Efficient
Fixtures Retrofit
of
the
Public
Works
Opera3ons
Center
to
harness
wind
power
for
the
building's
energy
needs.

Project
Descrip3on

Hollywood

FL

Energy

Convert
a
closed
trash
transfer
sta3on
into
a
neighborhood
friendly
green
waste
mulching/recycling
center.

Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Public
Safety Public
Safety Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Fire
Sta3on
Replacement Police
Administra3on
Facility Alley
Reconstruc3on Street
Resurfacing 1500
KW
generator
(#3)
as
backup
for
en3re
plant.
Switchgear
and
instrumenta3on. Acid
(Pre‐Treatment)
Pipe
Replacement
plus
Addi3on
of
Pipe
Post‐Treatment Addi3on
of
2
New
Sodium
Hypochlorite
Genera3on
Cells
and
Related
Storage
Tanks Addi3on
of
Valve
Controls
and
Misc.
Repairs
to
Injec3on
Wells Assessment
of
Steel
Filters
and
Spiractors
Structural
Integrity Bar
Screens
Rehab
and
Repairs Chlorina3on
Facility
Rehab Clarifier
Nos.
5‐6
Rehabilita3on Clean,
Recoat
and
Reseal
the
Containment
Area
for
the
Chemical
Storage
Tanks Computer
Control
System
Upgrade
‐
Wastewater
Treatment
Plant Conserva3on
Phase
I Conserva3on
Phase
II Conserva3on
Phase
III Construct
McKinley
St.
Parallel
Interceptor Con3nue
GIS
Database
Improvement Con3nue
Gravity
System
Condi3on
Assessment
and
Renewl/Repl
(I/I) Conversion
/
Upgrade
of
Sewer
PS
W‐03
(currently
under
design) Deep
Injec3on
Well
for
MS/RO
Concentrate
Disposal De‐grit
Oxygena3on
Trains Develop
Collec3on/Transmission
System
Hydraulic
Model Dixie
Highway
Corridor Effluent
PS
Rehab Effluent
PS‐Gravity
Disposal
System
Replacement
and
Other
Repairs Evalua3on
&
Replacement
of
Flow
Meter
at
Water
Treatment
Plant Expand
Blend
Tank Floridan
Wells
F10
&
F13
Wellhead
Piping,
Pumps
and
Vaults
(DCA
project) Floridan
Wells
F14
&
F15
and
Associated
Transmission
Mains
(DCA
project) Grit
Removal
System
Rehab
and
Replacement High
Service
Pump
Facility
Rehabilita3on
and
Upgrade I/I
Basins
H‐11,
H‐15W
and
H‐31 Influent
Pump
Sta3on
Repairs Install
US
441
/
State
Road
7
Corridor
Sewer Installa3on
of
Chemical
Feed
System
Flowmeters Integrate
Ammonia
Feed
System
into
the
Plant's
SCADA
System Integrate
Sodium
Hypochlorite
Feed
System
into
the
Plant's
SCADA
System Intracoastal
Crossing
Pipe
Replacement
(Lib
Sta3on
E‐3
Force
Mains) Lib
Sta3on
Conversions/Upgrades Mechanical
Integrity
Test
for
Injec3on
Wells Mechanical
Rehab
of
Three
Floridan
Wells
(F2,F3
&
F5) New
14,000
gpm
High
Service
Pump
(HSP) Ouzall
Rule
Change
Compliance
Projects
(deep
wells
with
HLD) Oxygena3on
Trains
Nos.
1‐5
Rehab
&
42"
Influent
CIP
Liner Pain3ng
and
Restora3on
of
Two
(2)
Elevated
Water
Tanks Pain3ng
and
Restora3on
of
Water
Treatment
Plant
Facili3es Pain3ng
Wastewater
Treatment
Plant Plan
Assessment
of
Large‐Diameter
Reinforced
Concrete
Pipe
Condi3on PLC
Replacement
at
SRWWTP Provide
High
Level
Monitoring
and
Trending
of
Data
Values
from
the
LIMS
and
SCADA
Systems

Funding
Required

Jobs












3,000,000


15










47,000,000
 








15,000,000
 










4,000,000
 










2,500,000
 








20,000,000
 










2,000,000
 








10,000,000
 








10,000,000
 








25,000,000
 












550,000
 










5,000,000
 










1,000,000
 










2,000,000
 










4,500,000
 








15,000,000
 










2,000,000
 








80,000,000
 










2,000,000
 










8,000,000


30 500 200 250 300 500 500 500 500 10 25 50 200 500 500 100 3000












1,300,000


2












2,500,000
 










7,500,000
 








50,000,000
 










5,000,000
 










2,000,000
 










1,000,000
 












300,000
 












805,000
 














80,000
 












100,000
 








14,000,000
 












140,000
 










2,150,000
 












200,000
 










1,100,000
 












200,000
 












300,000
 












500,000
 








14,000,000
 












800,000
 








20,000,000
 












709,000
 








17,500,000
 










3,000,000
 












800,000
 










6,000,000
 








14,641,000
 










1,600,000
 










1,100,000
 










1,000,000
 










1,400,000
 










4,000,000
 








19,500,000
 










2,000,000
 










5,200,000
 












300,000
 










8,000,000
 














50,000
 












100,000
 












100,000
 










2,590,000
 










8,400,000
 












330,000
 












800,000
 












500,000
 








92,800,000
 










1,030,000
 










2,500,000
 










2,000,000
 












200,000
 














80,000
 












550,000


12














100,000


City

State

Program

Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Hollywood Homestead

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Energy

Homestead

FL

Energy

Homestead

FL

Energy

Homestead

FL

Energy

Homestead

FL

Energy

Homestead

FL

Energy

Homestead

FL

Public
Safety

Homestead

FL

Public
Safety

Homestead

FL

Public
Safety

Homestead

FL

Public
Safety

Homestead

FL

Public
Safety

Homestead

FL

Public
Safety

Project
Descrip3on RAS
Pump
Sta3ons
Repairs
and
Upgrades Reactor
Feed
Pumps
Replacement
at
the
Residuals
Facility Rehab
of
Clarifier
Nos.
5‐8
Flow
Distribu3on
Box Repair
of
Cracks
in
Filters
and
Administra3on
Building Repair
or
Upgrading
of
Flow
Distribu3on
Box.

North
and
South
Electric
Service
Centers Replace
Lime
Slakers
and
Lime
Feed
System
(4
units) Replace
PS
E‐02
Force
Main
and
ICW
Crossing Replace
PS
E‐07
Pumps Replace
PS
N‐02
Pumps Replace
PS
N‐03
Pumps,
Force
Main
and
Gravity
Piping Replace
PS
N‐04
Pumps,
Force
Main
and
Gravity
Piping Replace
R.O.
Train
"B" Replacement
and/or
Rehabilita3on
of
Reuse
Facili3es Replacement
of
the
Reclaimed
Water
Pumps Retrofit
RO
Skid‐Train
A Reuse
System
Storage
Tank RO
Train
D
(2
mgd) RO
Train
E
(2
mgd) Sludge
Cake
Pumps
Repl
and
Misc
Repairs SRWWTP/Collec3on/Transmission
System
Data
Historian
Upgrade Switchgear
Cleaning,
Recalibra3ng
and
Tes3ng Tab
St.
Interceptor
Rehab Upgrade
Ammonia
System
from
Gas
to
Liquid Upgrade
the
Exis3ng
MS
Feed
Pumps
to
VFD Upgrade
the
remote
telemetry
site
PLCs
and
in‐plant
PLCs U3li3es
Reloca3ons
to
Support
SR7
Widening WAS
System
Rehab Wastewater
Capacity
Analysis Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades Water
Distribu3on
Upgrades
at
the
North
End
of
A1A Water
Main
Replacement
Program Water
Treatment
Plant
South
Header
Rehabilita3on West
Hollywood
Pumping
and
Storage
Facility WS
Offseqng
Reuse
Planning,
Demonstra3on
and
Related
Ac3vi3es. WTP
Emergency
Generator
#4. Electrical
U3lity
System
Automa3on:

Installa3on
of
intelligent
line
reclosers
and
line
sec3onalizers
in
the
 Distribu3on
Circuits
to
decrease
customer
minutes

interrup3ons
opening
faster
the
faulty
distribu3on
circuit
 sec3on. Increase
Substa3ons
Capacity:
Installa3on
of
two
40
MVA
Power
Transformers
at
Redland
&
Renaissance
 Substa3ons
due
to
increase
of
the
system
peak
from
89
MW
to
expected
125
MW
in
2015.

 138
KV
Transmission
Loop
and
Second
Interconnec3on
with
the
FPL
BPS:

Improving
reliability
standards
 building
a
138
KV
Transmission
Line
ring
between
Renaissance
and
Redland
Substa3ons,
and
create
a
second
 point
of
interconnec3on
with
the
FPL.
 Administra3on
and
T&D
Facili3es:

Construc3on
of
a
building
facility
to
host
Customer
Service
System
 Opera3on
&
Control
Center
and
the
U3lity
administra3on
area
in
one
loca3on
to
improve
management
 efficiency.

 Hardening
the
13
kV
Electrical
Distribu3on
System:

Hardening
the
distribu3on
system
in
2
phases;
(1)
 underground
secondary
services
&(2)
underground
primary
Laterals.
Also,
for
OH
pole
inspec3on
&
 replacement
from
wood
to
concrete
or
steel
poles.

 Installa3on
of
New
Genera3on
Units:

Installa3on
of
two
25
MW
units
LM2500’s
to
balance
system
load
and
 resources.

The
installa3on
of
new
higher
efficiency
generators
will
reduce
energy
waste
and
also
reduce
the
 carbon
footprint. Informa3on
Technology
to
include
hardening
of
City
infrastructure,
upgrade
exis3ng
fiber
infrastructure
to
 single
mode
fiber
and
reposi3on
into
underground
conduit.
Install
permanent
emergency
generators
at
both
 the
City
datacenter
and
PBX.
 Citywide
WiFi
free
wireless
internet
access:

This
project
would
create
a
wireless
network
to
provide
free
 access
to
all
residents
of
the
City.

This
would
enhance
the
communica3on
between
government
and
general
 public. Citywide
Safety
Cameras.

Cameras
will
provide
increasing
coverage
of
police
presence
in
an
effort
to
 discourage
&
reduce
crime
ac3vity.
Project

will
provide
the
general
public
w/
peace‐of‐mind
&
added
 protec3on.
 Construc3on
of
New
City
Hall:
The
exis3ng
City
hall
is
not
adequate
to
house
all
depts
required
to
provide
svcs
 to
the
growing
popula3on.

New
bldg
was
designed
to
meet
strict
requirements
of
LEEDS
silver
cer3fica3on
as
 a
green
building.
 LEED
Cer3fica3on
of
City
Buildings
to
meet
cer3fied
guidelines
including
major
renova3ons. Police
Headquaters'
Bldg:

The
City
of
Homestead
has
experienced
rapid
popula3on
growth
which

requires
the
 expansion
of
the
police
depts
making
the
exis3ng
bldg
inadequate
to
house
and
provide
the
svcs
in
an
efficient
 manner.

Funding
Required 












270,000
 










3,000,000
 










2,100,000
 












350,000
 












440,000
 










1,600,000
 










1,500,000
 












600,000
 












448,000
 












478,000
 










1,158,000
 










3,000,000
 










1,330,000
 














50,000
 










1,600,000
 










5,000,000
 










3,000,000
 










3,000,000
 










4,400,000
 














75,000
 












125,000
 










7,000,000
 












160,000
 












650,000
 












480,000
 










4,000,000
 












250,000
 












100,000
 














34,000
 














48,000
 














84,000
 














87,000
 














96,000
 












130,000
 












144,000
 












164,000
 












240,000
 












423,000
 












810,000
 










1,000,000
 










1,000,000
 










5,000,000
 












360,000
 










4,000,000
 










5,000,000
 










1,100,000


Jobs












2,000,000


40












3,000,000


40












5,000,000


60












2,500,000


60










12,500,000


90










47,000,000


100












1,500,000


15












2,000,000


40










20,000,000


90










35,000,000


100










35,000,000


100










40,000,000


200

City

State

Program

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Streets/Roads

Homestead

FL

Water

Homestead

FL

Water

Homestead

FL

Water

Homestead

FL

Water

Homestead

FL

Water

Homestead

FL

Water

Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Airport Airport Amtrak Amtrak CDBG CDBG CDBG Energy Energy Energy Energy Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Water

Project
Descrip3on Ligh3ng
improvements
at
SW
328
Street:

Installa3on
of
light
poles
along
SW
328
St
from
SW
137
Ave
to
US1.

 This
project
would
result
in
safer
driving
condi3ons.
 Intersec3on
Improvement
at
SW
328
St
and
US1;

at
US1
&
SW
312
St;
&
at
Krome
Ave
and
SW
312
St.

Projects
 will
improve
traffic
flow,
reducing
travel
3me
&
impact
on
the
environment
from
carbon
emissions. Mowry
Dr
Roadway
Improvements:

Widening
of
Roadway
from
2
lane
to
2
lane

w/
dedicated
con3nuous
Leb
 Turn
lanes.

Drainage
system
improvements
as
per
highway
standards
from
Krome
Ave
West
to
SW
187
Ave.
 SW
162
Ave
Expansion
from
SW
312
St
to
SW
328
St.

Widening
of
Roadway
from
2
lane
to
4
lane
Median
 Divided
Roadway
with
dedicated
Leb
Turn
lanes
(includes
Bridge
replacement). Campbell
Dr
Improvements:
Widening
of
Rdway
from
2
lane
to
6
lane
Median
Divided
Rdway
with
dedicated
 Leb
Turn
lanes.

Campbell
Drive
‐
from
SW
157
Ave
to
SW
182
Ave.
Improvement
will
reduce
travel
3me
&
 conges3on
thereby
reducing
the
carbon
footprint. Lucy
St
Expansion
(SW
328
St
from
US1
to
SW
187
Ave).

Widening
of
Rdway
from
2
lane
to
4
lane
Median
 Divided
Rdway
w/
dedicated
Leb
Turn
lanes.
(SW
328
St
from
US1
to
SW
187
Ave).


Improvement
will
reduce
 travel
3me
&
conges3on,
carbon
footprint. North
Canal
Dr
Expansion: Widening
of
Rdway
from
2
lane
to
4
lane
Median
Divided
Rdway
w/
dedicated
Leb
Turn
lanes.

From
SW
137
 Ave
to
US1.
Improvement
will
reduce
travel
3me
&
conges3on,
carbon
footprint
&
improve
the
quality
of
life
&
 environment. Addi3onal
Turnpike
Access
Ramps
at
Campbell
(SW
312
Street):

Addi3onal
West
to
North
and
South
to
West
 Ramps.

Improvement
will
reduce
travel
3me
&
conges3on
thereby
reducing
the
carbon
footprint
&
improve
 the
quality
of
life
and
environment. New
Turnpike
Access
Ramps
at
North
Canal
Drive
(SW
328
Street):

New
West
to
North
and
South
to
West
 Ramps.

Will
reduce
travel
3me
and
conges3on
thereby
reducing
the
carbon
footprint
and
improve
the
quality
 of
life
and
environment. Campbell
Drive
widening
from
4
lane
divided
to
a
6
lane
divided
roadway.
Improvement
will
reduce
travel
3me,
 traffic
concurrency
and
conges3on.
It
will
improve
traffic
concurrency
and
new
businesses. Citywide
Sidewalk
construc3on
program.


Project
includes
the
addi3on
of
sidewalks
on
all
city
roads.

Project
 will
encourage
the
use
of
alterna3ve
transporta3on
modes
&
reduce
impact
of
carbon
emissions
by
providing
a
 clean
&
safe
mode
of
travel. Wrt
&
Wstwtr
Telemetry:
Purchase
&
installa3on
of
telemetry
equipmt.
Telemetry
in
all
pumps
sta3on
sends
 flow/performance
data
&
alarm
situa3ons
to
a
central
loca3on
that
increase
reliability
&
control
before,
during
 &
aber
a
disaster.
 Water
storage
tanks:

2
MG
storage
tank
required
to
increase
reliability
and
handling
of
peak
demands
for
 potable
water.

This
tank
is
needed
to
increase
storage
at
the
north
east
sec3on
of
the
city. Headworks
and
Pre‐treatment:

Construc3on
of
screening,
de‐griqng
and
pumping
facili3es
at
exis3ng
 Wastewater
Treatment
plant.

Will
provide
added
efficiency
to
the
current
treatment
process
at
the
plant
 resul3ng
in
befer
quality
effluent.

 Increase
capacity
Wtr
Treatment
Plant:

Expand
&
increase
capacity
at
Wtr
Plant.
Reverse
Osmosis
treatment
 process
for
treatment
will
result
in
befer
potable
wtr
quality
by
removing
most
cons3tuents
&
improving
 health
&
welfare
of
the
general
public. City‐Wide
Stormwater
Improvement:

Design
and
construct
storm
water
collec3on
and
storage
facili3es
to
 improve
protec3on
against
flooding
during
and
aber
mayor
rain
and
storm
events. Wstwtr
Treatment
Plant
Expansion:

Expand
treatment
capacity...6
MGD
to
10
MGD.
Rapid
popula3on
growth
 resulted
in
increased
demand
for
wstwtr
svcs.
Plant
expansion
would
provide
needed
capacity
&
meet

 agencies'
an3cipated
treatment
requirements. Building
hardening Taxi
way
restora3on Building
Improvements
Various
Areas Signing
and
Signaliza3on
Upgrades Countywide
Drainage
System
Rehab Hogans
Creek
rehabilita3on McCoys
Creek
rehabilita3on Southeast
Area
Water
Distribu3on
System Jax
Muncipal
Stadium
HVAC
upgrade Public
Buildings
systems
retrofit Southeast
Area
Reclaimed
Water
System stormwater
retrofits
various
loca3ons Building
renova3ons
various
areas Radio
Infrastructure
PH.
I Sheriffs
Office
Gun
Range
Upgrade Emergency
Ops
Center
Hardening FIre
Rescue
CAD
system Jacksonville
Correc3ons
Center
at
Lannie
Road
Building
Improvements Jacksonville
Pre‐Trial
Deten3on
Center Fire
Sta3on
#61 Fire
Sta3on
#62 Building
System
retrofits
various
loca3ons Northwest
District
Stormwater
retrofit Southeast
District
Stormwater
System
Retrofit Traffic
Sinage
County‐wide Norhtwest
Area
resurfac3ng Southeast
Area
resurfacing Downtown
signaliza3on
retrofit ITS
enhancments
at
challenged
intersec3ons Jacksonville
Transporta3on
Center Northwest
Area
water
distribu3on
system

Funding
Required

Jobs












1,600,000


30












2,000,000


35












6,000,000


50












6,500,000


65










20,000,000


70












8,000,000


70










21,000,000


70












7,000,000


80












7,000,000


80










20,000,000


100










20,000,000


110












1,500,000


20












5,000,000


40










20,000,000


140










50,000,000


140










25,000,000


150










90,000,000
 










5,000,000
 








10,000,000
 










5,000,000
 










5,000,000
 










7,500,000
 








10,000,000
 








10,000,000
 










7,500,000
 










2,500,000
 








10,000,000
 










7,500,000
 










7,500,000
 








10,000,000
 










4,000,000
 










1,000,000
 










1,000,000
 










2,000,000
 










5,000,000
 










5,000,000
 










3,000,000
 










3,000,000
 










5,000,000
 










5,000,000
 










5,000,000
 










5,000,000
 








10,000,000
 








10,000,000
 










2,500,000
 










5,000,000
 










5,000,000
 










7,500,000


250 10 50 10 10 15 20 20 7 10 10 30 30 50 5 5 7 10 10 10 25 25 15 25 25 10 20 20 10 15 15 30

City

State

Program

Jacksonville Jacksonville Jacksonville Jacksonville Jacksonville Key
Biscayne

FL FL FL FL FL FL

Water Water Water Water Water Water

Lakeland

FL

CDBG

Lakeland

FL

CDBG

Lakeland

FL

Public
Safety

Lakeland

FL

Streets/Roads

Lakeland

FL

Water

Largo

FL

CDBG

Largo

FL

CDBG

Largo

FL

Streets/Roads

Largo

FL

Streets/Roads

Largo

FL

Streets/Roads

Largo

FL

Streets/Roads

Largo

FL

Streets/Roads

Largo

FL

Streets/Roads

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Largo

FL

Water

Lauderdale
Lakes

FL

CDBG

Project
Descrip3on Southeast
Area
Reclaimed
Water
System Southeast
Area
Water
Distribu3on
System Northwest
Area
sewerage
system Southeast
Area
sewerage
system Wastewater
Treatment
System
enhancements
countywide Replace
sep3c
tank
systems
for
706
residen3al
homes
to
sanitary
sewers
and
replace
50‐year
old
asbestos
 water
mains.
Key
Biscayne
is
an
island
and
sep3c
tank
materials
overflow
and
impact
Biscayne
Bay
and
the
 project
is
required
by
our
Master
Plan
file Freedom
Park
(Downtown
Park
and
open
space
ini3a3ve
supported
by
the
Na3onal
Park
Service)

Freedom
 Park
is
a
1.2
acre
urban
park
designed
as
a
neighborhood
park
adjacent
o
the
City’s
historic
middle
school
 (Lawton
Chiles
Middle
School).
 Cypress
Youth
Sports
Complex
(Major
Sports
and
Recrea3on
Facility
established
to
meet
concurrency
 requirements
of
the
City
and
State) The
Cypress
Youth
Sports
Complex
is
designed
as
a
33
acre
community
park
designed
to
service
citywide
youth
 football
 Southwest
Lakeland
Area
Fire
Sta3on
(Servicing
the
Southwest
area
and
Lakeland‐Linder
Regional
Airport) The
construc3on
of
a
new
fire
sta3on
in
the
southwest
area
of
the
City
of
Lakeland
will
service
the
growing
 commercial,
industrial
and
residen3al Waring
Road
Extension
(Western
boundary
of
City
of
Lakeland,
Florida)




 This
project
will
extend
the
southerly
terminus
of
Waring
Road
south
to
W.
Pipkin
Road,
approximately
3500
 feet,
or
0.66
miles.
 Lake
Gibson
Southwest
Basin
Stormwater
Retrofit
(Flood
Management
and
pollu3on
control
to
waters
on
 northern
and
central
areas
of
the
City
of
Lakeland,
Florida)
 Lake
Gibson
is
a
489‐acre,
headwater
lake
in
the
Peace
River
Basin.
 Infrastructure
Improvements
‐
Sidewalks
–
Construc3on
of
urban
trails
within
the
CDBG
target
area.
Provides
 connec3vity
within
the
neighborhoods,
and
enhances
safety
condi3ons
for
kids
to
and
from
the
local
school.

 Housing
Rehabilita3on
–
CDBG
funds
assist
in
affordable
housing
and
infrastructure
improvements
for
rental
 and
owner
occupied
unit
rehabilita3on
benefi3ng
low
income
ci3zens.
10
jobs. Mul3‐use
trail
and
sidewalk
construc3on
and
repair
‐
Facilitates
the
implementa3on
of
community
 connec3vity,
a
core
objec3ve
of
the
City's
long‐term
sustainability
plan.
This
project
will
connect
schools,
 neighborhoods,
parks,
civic
afrac3ons
,
etc. Local
Road
Paving,
Reconstruc3on,
&
Resurfacing
–
Extends
the
service
life
of
the
City's
roadways,
improves
on
 their
driving
condi3ons,
and
minimize
maintenance
needs.

Resurfacing
overlays
will
restore
surface
 smoothness
and
increase
the
integrity
 Mast
Arm
Design
and
Installa3on
program
–
This
project
includes
replacement
of
the
concrete
poles
and
span
 wire
traffic
signal
structures
with
galvanized
steel
mast
arms.
Exis3ng
structures
are
not
designed
to
withstand
 FDOT
standard
of
110mph
wind
load Unpaved
Road
Program
‐
Construct
roads
where
only
unpaved
roads
exist
within
the
City
right‐of‐way
(ROW).
 Priori3zed
based
on
number
of
homes
serviced,
stormwater
permiqng
constraints,
and
project
cost.
 
4th
Street
SW
Road
Reconstruc3on
‐
Re‐design
of
Fourth
Street
SW
roadway
from
Cleveland
to
8th
Ave
SW
to
 include
full
brick
reconstruc3on,
drainage
improvements,
the
installa3on
of
wider
8
foot
sidewalks,
and
buffer
 areas
for
landscaping.
 Highland
Avenue
Reconstruc3on
‐
Reconstruc3on
of
Highland
Avenue
to
include
median
landscaping
and
 center
turning
lanes,
as
well
as
drainage
system
modifica3ons
to
address
roadway
wear,
standing
water
and
 localized
flooding.
 Alum
Facility
Improvements
‐
This
project
includes
design
and
construc3on
of
a
new
pollutant
removal
system
 at
the
Largo
Regional
Stormwater
Treatment
Facility. Lib
Sta3on
19
Forcemain
Rehabilita3on
‐
There
has
been
frequent
breaking
of
the
force
main
concluding
that
it
 has
reached
the
end
of
its
useful
life.

With
the
forcemain's

close
proximity
to
the
intracoastal
waterway,
it
 needs
to
be
replaced
 Downtown
Regional
Stormwater
Treatment
Pond
Rehabilita3on
‐
The
purpose
of
this
project
is
to
replace
the
 underdrain
systems
of
the
Downtown
Drainage
Ponds,
which
provide
regional
stormwater
treatment
for
 proper3es
located
in
the
West
Bay
Drive
Redevelopment
area Kent
Place
Ditch
Improvements
‐
The
project
consists
of
evalua3on,
acquisi3on,
redesign,
and
reconstruc3on
 of
the
ditches
to
include
clearing,
regrading,
and
bank
stabiliza3on.
This
will
improve
on
their
conveyance
and
 capacity. Lib
Sta3on
Upgrades,
Construc3on
‐
The
City
owns
and
operates
52
lib
sta3ons,
each
of
which
requires
 periodic
preventa3ve
maintenance
and
rehabilita3on
in
order
to
maintain
class
one
reliability
and
sa3sfy
 guidelines Sunset
Manor
Drainage
Improvements
‐
This
will
provide
improvements
to
the
ouzall
ditch.
The
exis3ng
ditch
 banks
have
eroded
to
the
point
where
it
is
approaching
the
adjacent
property
lines.
 Annual
Stormwater
Replacement
Program
‐
The
purpose
of
this
program
is
to
replace
deteriorated
stormwater
 infrastructure.
The
project
is
comprised
of

two
components.

The
first
is
the
replacement
of
exis3ng
 stormwater
pipes
and
structures
that
are
faili Interceptor
Manhole
Rehabilita3on
‐
This
project
consists
of
by‐pass
pumping,
cleaning,
patching
and
sealing
 of
100
manholes
along
the
City's
main
interceptor
sewer
pipe.

The
scope
of
the
project
includes
the
 installa3on
of
an
epoxy
based
coa3ng
 
Church
Creek
Phase
2
‐
The
Church
Creek
drainage
basin
is
located
in
southwest
Largo.

The
current
drainage
 system
is
in
poor
condi3on
and
does
not
have
the
necessary
capacity.
This
project
replaces
the
aging
 infrastructure,
improves
capacity,
etc. Largo
Towne
Center
Sanitary
Sewer
Infrastructure
Improvements
‐
Sanitary
sewer
infrastructure
improvements
 designed
to
increase
capacity
and
meet
concurrency
requirements
with
the
Largo
Towne
Center
Development.

 The
Town
Center
is
a
mixed
use
project
 Margaret
Manor
Drainage
Improvements
‐
This
project
includes
installa3on
of
a
drainage
system
within
the
 Margaret
Manor
subdivision
to
collect
and
convey
stormwater
to
McKay
Creek.
The
stormwater
collec3on
 system
within
the
subdivision
is
inadequate Northwest
Sanitary
Sewer
Expansion
–
This
project
will
serve
two
primary
purposes:
allow
for
redevelopment
 in
the
Clearwater‐Largo
Road
Community
Redevelopment
District,
and
reduce
wastewater
flows
to
the
 Donnegan
Road
area Park
Improvements

Funding
Required Jobs 










7,500,000
 30 










7,500,000
 30 








15,000,000
 60 








15,000,000
 60 








20,000,000
 70












5,000,000


60












2,800,000


75












6,064,000


250












2,500,000


100












5,000,000


250












1,500,000


100














600,000


20














500,000


300












1,000,000


20












1,000,000


25












1,500,000


30














820,000


30












2,200,000


60












7,150,000


90














300,000


10
















95,000


15














750,000


20














680,000


20














450,000


20












1,270,000


20












1,420,000


30












1,650,000


30












1,450,000


40














940,000


40












1,425,000


50












2,400,000
 










5,000,000


95 5

City

State

Program

Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes Lauderdale
Lakes

FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Citywide
Sidewalk
Improvements Community
Center Community
Policing
Training Wireless
Computer
Technology
for
Police
Vehicles City
Emergency
Opera3on
Center 10
New
Police
Officers
to
expand

community
policing
and
to
address
crime
trends Police
Sta3on
Renova3on
Project Fire
Sta3on
Project Culvert/Bridge
Improvement
Project NW
36
Terrace
Roadway
Project

including
drainage
improvements
 Stormwater
Drainage
Improvements NW
31st
Avenue
Roadway
Project
to
improve
pedestrian
safety
and
reduce
traffic
conges3on

Project
Descrip3on












3,200,000


15

Lauderdale
Lakes

FL

Streets/Roads

NW
36th
Street
&
NW
43rd
Avenue
Roadway
Project












2,000,000


15

Lauderdale
Lakes

FL

Streets/Roads

Citywide
Canal
Bank
Stabliza3on
Project












5,000,000


20

Lauderdale
Lakes

FL

Streets/Roads

NW
49th
Avenue
Roadway
Project
to
improve
road/pedestrian
safety
and
reduce
traffic
conges3on

Lauderdale
Lakes Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Lauderhill Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Transit CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads Water Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport Airport CDBG CDBG

25 50 40 50 80 100 100 125 200 300 600 80 100 200 250 30 50 150 200 30 40 46 60 67 80 86 100 100 125 140 165 170 400 715 2














225,770


2

Miami

FL

CDBG

Miami

FL

CDBG

Mul3‐Modal
Transporta3on
Facility Fire
Sta3on
73
Addi3on
&
Upgrade Pine
Island
Road
Privacy/Security
Wall Sadkin
Center
Renova3ons John
Mullin
Park
Improvements Westwind
Community
Center First
City
Hall
Renova3on/Museum SE
Annex
Misc.
Improvements Misc.
Park
Improvements
‐
City
Wide Arts
&
Cultural
Center/Library LED/Induc3on
Street
Ligh3ng Water
Reclama3on
for
Irriga3on
‐
Purple
Pipe
Program City
Wide
Energy
Rehab
Project New
City
Hall
‐
LEED
Silver Oakland
Park
Paver
Improvements US
441/State
Road
7
Intersec3on
Improvements 56th
Avenue
Roadway,
Drainage,
Ligh3ng,
Landscaping
and
Signaliza3on
Improvements Reverse
Osmosis
Plant
and
Water
Conserva3on
Program Runway
27
‐
Threshold
Reloca3on
(CAPACITY) Sewer
Booster
PumpSta3on
(CAPACITY) North
Terminal
Development
Program
‐
Regional
Commuter
Facility North
Terminal
Development
Program
‐
Regional
Commuter
Facility
Covered
Walkway North
Terminal
Development
Program
‐
Cc.
D‐C
400HzPower
and
Pre‐Condi3oned
Air Watson
Island
Heliport
Facility New
FAA
Air‐Traffic
Control
Tower
(ATCT)
(SAFETY) Airport
Police
Department
K‐9
Facility
(SECURITY) North
Terminal
Development
Program
‐
Cc
D
Extension
Comple3on
Work North
Terminal
Development
Program
‐
Contract
746I
‐
BC
3rd
Level
Office
Remodeling MIA
Perimeter
Road
Widening
and
Rerou3ng
through
NW
42nd
Court
(SECURITY) Security
&
Opera3ons
Command
Center
(SECURITY) TMB
‐
Runway
9R‐27L
Extension
(CAPACITY) North
Terminal
Development
Program
(CAPACITY) MIA
Central
Boulevard
Widening,
Realignment
and
Service
Loop
project


(CAPACITY) BMX
and
Dirt
Bike
Trails
at
Virginia
Key
Park Lummus
Park
Historic
Building
Restroom,
Remodel
exis3ng
historic
building
to
new
use
with
new
AC
and
 electrical
systems. Dinner
Key
Dredging
Mi3ga3on,
Placement
of
approx
1,1000
cy
of
riprap
as
part
of
DERM
requirement
for
the
 dredging
project Albert
Pallot
Park
Playground
and
Site
Furnishings












5,000,000
 








11,000,000
 












580,000
 










2,680,000
 












900,000
 










1,500,000
 










1,250,000
 










1,110,000
 










4,300,000
 










2,316,000
 








18,000,000
 










1,000,000
 










1,500,000
 










3,000,000
 








11,000,000
 












300,000
 












630,000
 








11,210,000
 








40,000,000
 










1,500,000
 










2,600,000
 








17,000,000
 








16,000,000
 










7,000,000
 










4,000,000
 










1,900,000
 










4,500,000
 










5,000,000
 








16,000,000
 








24,000,000
 








15,000,000
 








13,000,000
 








61,000,000
 








97,000,000
 












100,000


Miami

FL

CDBG

North
Bayshore
Drive
Opera3onal
Improvements,
Traffic
Roundabout
and
Median
Modifica3ons

Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Miami

FL

CDBG

Kennedy
Park
Restroom
Building
Improvements,
New
650
sf
restrooms‐storage
building New
Sewell
Park
Restroom/Office
Building Citywide
Emergency
Park
Generators IT
Infrastructure
Moderniza3on
 New
Brickell
Park
at
South
Miami
Ave Water
Main
Life
Sciences
Environmental
Assessment Bryan
Park
New
Tennis
Center,
New:
2,000
sf
recrea3on
building,
one
addi3onal
tennis
court
and
sports
 ligh3ng Robert
King
High
Park
Soccer
Field,
New
soccer
field,
restrooms
building,
parking
lot,
irriga3on,
and
bleachers
.

Miami Miami

FL FL

CDBG CDBG

Miami

FL

CDBG

Miami

FL

CDBG

Miami

FL

CDBG

Miami Miami Miami

FL FL FL

CDBG CDBG CDBG

Ambrister
Park
Improvements Coral
Gate
Park
Building
Improvements,
New
4,500
sf
of:
offices,
restrooms,
community
spaces,
roofed
terrace,
 parking,
landscaping
&
irrig. Duarte
Park
Building
Renova3on/Expansion,
Remodel
and
expand
exis3ng
Recrea3on
Building
to
include
mul3‐ purpose
room,
office
and
A/C
system. Grapeland
Flowrider
‐
construc3on
of
a
new
aqua3c
element
in
the
water
park Hadley
Park
Restrooms/Concession
Building,
New
4,500
sf
building
w/
restrooms,
field
office,
storage
and
 concession
&
terrace
area. Miamarina
Emergency
Pier
Repairs,
Marina
Repairs
and
Restora3on Dinner
Key
Mooring
Field
Project,
Boat
Anchorage
and
Upland
Improvements Dinner
Key
Dredging,
Dredging
of
approx,
10,000
cy
for
the
main
approach
channel
at
north
end
of
marina

Funding
Required Jobs 










1,500,000
 7 








10,000,000
 80 














75,000
 3 












250,000
 4 












700,000
 5 










1,250,000
 10 










2,000,000
 10 










4,900,000
 31 










1,250,000
 4 










1,400,000
 8 










3,000,000
 14














332,900


7














500,000


10














500,000
 












776,700
 












900,000
 










1,000,000
 








20,000,000
 










4,000,000
 










1,000,000


10 12 18 20 20 20 20












1,409,698


25












1,386,312
 










1,500,000


25 30












1,662,500


30












1,480,500


30












1,500,000


30












1,440,000
 










1,675,735
 










1,773,581


30 30 35












1,967,100


40

City

State

Program

Miami

FL

CDBG

Miami Miami

FL FL

CDBG CDBG

Miami

FL

CDBG

Miami Miami Miami Miami Miami

FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG

Miami Miami Miami

FL FL FL

CDBG CDBG CDBG

Miami

FL

CDBG

Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Miami

FL

CDBG

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Miami

FL

CDBG

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Project
Descrip3on

Funding
Required

Jobs

Henderson
Park
New
Office/Restroom
Facility,
New
1,200
sf
restrooms‐office‐
storage
building
,
2,000
sf

 covered
recrea3on
area Kennedy
Park
Restroom/Building
Improvements Miami
Rowing
Club
Building
Improvements/Addi3on
Parking
Lot

Improvements/Ligh3ng












2,097,470
 










2,000,000


40 40












2,000,000


40

Moore
Park
Charrefe
and
Building
Improvements,
Remodeling:
upgrade
of
exis3ng
areas
of
the
facility
and
 provide
new
instruc3onal
spaces New
Coral
Gate
Park
Building Public
Works
Opera3on
yard Roberto
Clemente
Gymnasium Simpson
Park
Environmental
and
Park
Improvements African
Square
Park
New
Bathroom
Building,
Splash
Playground
and
New
Recrea3on
Building












2,000,000
 










2,000,000
 










2,000,000
 










2,000,000
 










2,000,000


40 40 40 40 40












2,400,000
 










2,676,250
 










2,500,000


48 50 50












2,536,213


50












2,855,446
 










3,000,000
 










3,000,000
 










3,000,000
 










3,000,000
 










3,000,000
 










3,000,000


55 60 60 60 60 60 60












3,619,786


70












4,376,710
 










5,000,000
 










5,000,000
 










6,112,890
 










6,112,890
 










5,926,691
 










7,000,000
 








12,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000
 








10,000,000


80 100 100 120 120 120 140 198 200 200 200 200 200 200 200










11,000,000


230










20,868,105
 








20,000,000
 








20,000,000
 








25,000,000
 








25,000,000
 








28,000,000
 








30,000,000
 








30,000,000
 








40,000,000
 








94,000,000
 








71,685,987
 








70,000,000
 






100,000,000
 






172,000,000
 






200,000,000
 






210,000,000
 










4,400,000
 










1,000,000
 










1,000,000
 










5,000,000
 








10,000,000
 








30,000,000
 












195,839
 














98,345
 












154,500
 














67,473
 














81,037
 














92,700
 










1,049,018
 














98,345
 














82,750
 












120,000
 














59,007
 












185,400
 














61,800


400 400 400 500 550 560 600 600 800 900 1191 1400 2000 2762 4000 4134 2 17 20 100 200 600 4 4 4 4 4 4 4 4 4 4 4 4 4

Athalie
Range
Field
Improvements
and
Reconfigura3on MiaMarina
Pier
Improvements Williams
Park
Improvements,
Expand
building
for
offices,
mul3‐purpose
room,
storage.
Renovate
exis3ng
 spaces
and
pool
building Roberto
Clemente
Park
Recrea3on
Building
Renova3on,
New:
9,000
s.f.
building
w/
offices,
mee3ng
rooms,
 recrea3on
spaces,
and
child
care
area. Citywide
Parks
ADA
Compliance,
Correc3on
of
ADA
deficiencies
at
24
City
parks Dinner
Key
Marina
Dock
Master
Building James
L.
Knight
Center
Renova3on
‐
ADA
accessibility,
other
improvements Manuel
Ar3me
Fire
Alarm/Sprinkler
Improvements Shenandoah
Recrea3onal
Building
Improvements Williams
Park
Community
Center/Recrea3on
Building Robert
King
High
Park
New
Building
Construc3on,
New
5,768
sf
Community
Building
and
site
improvements:
 covered
BB
court,
new
tennis
court,
ligh3ng
,
parking,
playground
&
picnic
area. North
Spring
Garden
Greenway
Improvements,
Miami
River
Greenway
Road
and
Drainage
Improvements Old
Firehouse
#
2
‐
structural
stabiliza3on
and
historic
renova3on Virginia
Key
Shoreline
Stabiliza3on
Project Buena
Vista
Heights
Street
Improvements
‐
Drainage
and
Road
Improvements Buena
Vista
Heights
Street
Improvements,
Phase
II,
Drainage
and
Road
Improvements North
Bayshore
Drive
Drainage
Improvements,
Drainage
and
Road
Improvements Caribbean
Market
Place
Building
Improvements Jackson
Health
System
Trauma
Center
 Bayfront
Park
Renova3on Camillus
House
Building
Improvements New
Cur3s
Park
Aqua3c
Center New
Duarte
Park
Building
‐
construc3on
of
a
new
community
building New
Morningside
Park
Aqua3c
Center New
Virrick
Park
Aqua3c
Center Site
Improvements
for
Fern
Isle
Park
Expansion Hadley
Park
Youth
Center
&
Field
Improvements,
New:
22,000
sf
building
w/
basketball
gym,
lockers
&
 restrooms,
classrooms,
storage
and
field
improv. Gibson
Park
New
Construc3on,
Demoli3on
of
exis3ng
buildings
and
construc3on
of
new
Community
Center,
 Aqua3c
Center,
Sports
&
Fitness
Center,
field
resurfacing
and
new
landscaping Legion
Park
Building
&
Kayak
Launch
Improvements Virginia
Key
Beach
Museum Grove
Waterfront
Park
Construc3on New
Moore
Park
Community
Center,
Tennis
Center
and
Day
Care Municipal
Broadband
Network Citywide
Environmental
Remedia3on Citywide
Fire
Sta3on
Construc3on
&
Improvements Virginia
Key
Landfill
Environmental
Conversion Orange
Bowl
Site
Parking
Garage,
Construc3on
of
mul3‐story
parking
garages. Jackson
Health
Facili3es
Infrastructure
Improvements Museum
Park
Construc3on Citywide
ADA
Improvements Jackson
Health
System
Capital
Projects Citywide
Parking
Garages
‐
marinas,
design
district,
upper
east
side,
lifle
Havana Jackson
Health
System
Pediatric
Ambulatory
&
Children's
Centers Fleet
upgrades
‐
purchase
of
200
hybrids
at
$22K
each Green
Lab
resource
center
construc3on Solar
panels
and
green
roof
installa3on
City
Hall
 Solid
Waste
Implementa3on
of
Single
Wastestream
and
Recycling
Program Building
energy
efficiency
upgrades
‐
for
20
City
buildings Citywide
Solar
Panel
Retrofit/Installa3on Arbase
ES‐Two
server
room
A/C
units Campbell
Drive
ES‐Install
surge
protec3on Charles
R.
Drew
MS‐Replace
perimeter
fencing Coral
Reef
ES‐Replace
the
air
cooled
chiller
for
the
media
center Cypress
ES‐Replace
4
5‐ton
package
A/C
units
for
the
dining
area Florida
City
ES‐Install
surge
protec3on Glades
MS‐HVAC
and
controls‐programming
in
progress Irving
&
Beatrice
Peskoe
ES‐Install
surge
protec3on Laura
C.
Saunders
ES‐Install
surge
protec3on Miami
Springs
SHS‐AFSS Norwood
ES‐Storefront
doors Palmefo
MS‐Replace
the
roof
top
chilled
water
AHU‐cafeteria West
Miami
MS‐Provide
6
power
poles
for
the
computer
lab

City

State

Program

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Project
Descrip3on William
A.
Chapman
ES‐Install
surge
protec3on Broadmoor
ES‐A/C
for
clinic
and
main
office Brownsville
MS‐Replace
package
unit
(6
pack
building) Campbell
Drive
MS‐Install
surge
protec3on Charles
R.
Hadley
ES‐Security
cameras Dr.
Henry
W.
Mack/West
Lifle
River
ES‐Replace
condensing
unit
for
media
center Flagami
ES‐Replace
the
obsolete
simplex
2400
clock
system George
T.
Baker
Avia3on‐Major
paint Hammocks
MS‐Replace/upgrade
auditorium
sea3ng Homestead
MS‐Play
field
restora3on Homestead
SHS‐AFSS
Home
EC.
Kitchens
1&2 Homestead
SHS‐Replace
gym
bleachers Joe
Hall
ES‐Replace
7
VAV
boxes
and
controls
for
the
main
office Kenwood
K‐8
Center‐Replace
5
package
A/C
units
in
Kitchen/Cafe,
replace
30‐ton
condensing
unit
for
media
 building Miami
Northwestern
SHS‐Fire
pump Miami
Springs
SHS‐Security
cameras Northwest
Transporta3on
Center‐Roofing Plant
Opera3ons‐Roofing Redland
Vehicle
Maintenance
Facility‐Major
paint Region
Maint
Center
3‐Roofing Region
Maint
Center
3‐Roofing
(Phase
1)
Mill
Annex Robert
Russa
Moton
ES‐Replace
the
master
clock
system Seminole
ES‐Major
paint South
Miami
Heights
ES‐Play
field
restora3on William
H.
Turner
Technical‐AFSS Blue
Lakes
ES‐Replace
playground Blue
Lakes
ES‐Roofing
(FDLRS) Chris3na
M.
Eve
ES‐Major
paint Coral
Park
ES‐Security
cameras Dr.
Carlos
J.
Finlay
ES‐Major
paint,
interior
corridor
cracks
require
stucco
repairs Emerson
ES‐Major
Paint Everglades
K‐8
Center‐Replace
playground Felix
Varela
SHS‐Major
paint‐correct
water
intrusion Flagami
ES‐Major
paint Highland
Oaks
MS‐Major
Paint Key
Biscayne
Community
School‐Major
paint Kinloch
Park
MS‐Major
paint Lawton
Chiles‐Major
Paint Lenora
Braynon
Smith
ES‐Major
paint Major
paint Merrick
Educa3onal
Center‐Roofing Miami
Park
ES‐Major
paint Miami
Springs
ES‐Water
intrusion
(rework
architectural
details
around
new
addi3on) Norwood
ES‐Emergency
generator Palm
Springs
MS‐Paint,
water
intrussion,
Bldg
6 Parkview
ES‐Major
paint Paul
Lawrence
Dunbar
ES‐Pipe
insula3on,
DX
units Redland
MS‐AFSS
Kitchens
1&2 Redland
MS‐Replace
gym
bleachers Redland
MS‐Upgrade
ligh3ng
in
hallways Regional
Center
IV‐Roofing
(Region
IV
Police) Riverside
ES‐Major
paint Robert
Russa
Moton
ES‐Replace
playground Shenandoah
ES‐Major
paint Skyway
ES‐Major
paint Southwest
Miami
SHS‐Misc
Maintenance‐stabiliza3on The
500
Role
Models
Academy‐Major
paint Tropical
ES‐Replace
playgorund Winston
Park
K‐8
Center‐Major
paint‐older
campus Chris3na
M.
Eve
ES‐ADA
Design
Package
11 Coral
Gables
SHS‐Major
paint Hammocks
MS‐HVAC
replacement
project
00459000‐design
phase
has
been
funded Homestead
MS‐AFSS
kitchens
one
and
two May
MS‐Replace/upgrade
auditorium
sea3ng Miami
Springs
ES‐Replace
playground Orchard
Villa
ES‐Replace
playground South
Miami
SHS‐Major
paint‐old
building Southwest
Transporta3on
Center‐Interior
paint
and
seal
parking
lots Airbase
ES‐Replace
fire
alarm
system Avocado
ES‐Replace
fire
alarm
system Banyan
ES‐En3re
fire
alarm
system Bel‐Aire
ES‐Replace
fire
alarm
system Blue
Lakes
ES‐Replace
the
A/C
units
for
the
media
center
and
ESE
buildings Campbell
Drive
MS‐Replace/upgrade
auditorium
sea3ng Caribbean
ES‐Replace
cooling
towers Centennial
MS‐Replace/upgrade
auditorium
sea3ng Chapman
House‐Fire
alarm
system

Funding
Required 














92,700
 












154,500
 












190,962
 












124,571
 












327,818
 












111,240
 












159,135
 












381,924
 












236,357
 












295,036
 












262,254
 












318,270
 














67,531
 












104,902
 














74,160
 












525,300
 












327,818
 












180,000
 














98,345
 












540,000
 












240,000
 












159,135
 












330,000
 












295,036
 












120,000
 












163,909
 












490,272
 












393,382
 












362,828
 












917,891
 












445,578
 












190,962
 










1,082,118
 












472,714
 










1,020,000
 












540,000
 












803,400
 










1,174,200
 












491,727
 












482,040
 












480,000
 












472,714
 












393,382
 














43,260
 










1,200,000
 












605,640
 












327,818
 












196,691
 












202,592
 












202,592
 












405,183
 












700,194
 












159,135
 












498,284
 












360,000
 












600,000
 












296,640
 












159,135
 












390,000
 














49,999
 










1,046,723
 










1,112,400
 












131,127
 












318,270
 












196,691
 












202,592
 












960,000
 












821,940
 












445,578
 












445,578
 












445,578
 












432,600
 












590,073
 












327,818
 












420,000
 












337,653
 












135,061


Jobs

4 6 6 6 6 6 6 6 6 6 6 6 6

6 6 6 6 6 6 6 6 6 6 6 6 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 10 10 10 10 10 10 10 10 10 12 12 12 12 12 12 12 12 12

City

State

Program

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Miami Miami Miami

FL FL FL

Schools Schools Schools

Charles
R.
Drew
MS‐Kitchens
1
and
2
AFSS Coconut
Grove
ES‐Fire
alarm
system Comstock
ES‐Chilled
water
AHU Comstock
ES‐Fire
alarm
system Comstock
ES‐Upgrade
switchgear
and
electrical
panel‐cafeteria/Kitchen Cope
Center
North‐Infrastructure
for
security
cameras Design
&
Architecture
SHS‐Major
paint
and
A/C
ductwork Dr.
Edward
L.
Whigham
ES‐Replace
HVAC
controls
and
insula3on Edison
Park
ES‐Fire
alarm
system English
Center‐Fire
alarm
system Ethel
Koger
Beckham
ES‐ADA
Design
Package
9 Florida
City
ES‐Replace
fire
alarm
system George
Washington
Carver
MS‐Fire
alarm
system George
Washington
Carver
MS‐Upgrade
electrical
panel Golden
Glades
ES‐Cooling
tower Gra3gny
ES‐Security
cameras,
fences,
and
security
alarm Greenglade
ES‐Replace
the
PA
system Gulfstream
ES‐Replace
chiller,
install
A/C
in
the
kitchen
Proj.
#00417200 Henry
S.
West
Laboratory
School‐Fire
alarm
system Highland
Oaks
MS‐Phase
2
HVAC Horace
Mann
MS‐AFSS
and
Hoods
Kitchens
1&2 Irving
&
Beatrice
Peskoe
ES‐Replace
fire
alarm
system Lake
Stevens
MS‐HVAC
Controls Laura
C.
Saunders
ES‐Replace
fire
alarm
system Miami
Heights
ES‐Replace
fire
alarm
system Miami
Lakes
Educa3onal
Center‐Major
paint Nau3lus
MS‐New
PA
throughout Palm
Springs
MS‐Kitchen
A/C Palmefo
ES‐Replace
the
PA
system Pine
Lake
ES‐Replace
2
main
AHU,
controls
throughout
school Region
Center
3‐Replace
chillers Regional
Center
III‐En3re
fire
alarm
system Rivera
MS‐Replace
the
PA
system School
Board
Administra3on
Complex‐Fire
alarm
system,
alarm
and
PA‐Annex
Building Shadowlawn
ES‐Fire
alarm
system Shadowlawn
ES‐Upgrade
service The
500
Role
Models
Academy‐En3re
fire
alarm
system West
Homestead
ES‐Replace
A/C
system
in
ESE
6
Pk,
replace
main
chiller William
A.
Chapman
ES‐Replace
fire
alarm
system ADA
Design
Package
8 Arcola
Lakes
ES‐Cooling
tower
and
piping Bent
Tree
ES‐ADA
Design
Package
No
8 Booker
T.
Washington
SHS‐AFSS
Kitchens
1&2,
fire
pumps Campbell
Drive
ES‐Replace
main
chillers,
standalone
A/C
for
media
room Citrus
Grove
ES‐Unit
ven3lators,
chilled
water
AHU,
RTUs Frederick
Douglass
ES‐Upgrade
electrical
panel Henry
E.S.
Reeves
ES‐Replace
chillers Hibiscus
ES‐Electrical
infrastructure
for
cameras John
G.
Dupuis
ES‐FA,
PA,
&
Clock,
security
alarm Kelsey
L.
Pharr
ES‐Chill
water
AHU,
pumps Kelsey
L.
Pharr
ES‐Upgrade
electrical
panel Maya
Angelou
ES‐Cooling
towers Miami
Gardens
ES‐FA,
PA
&
Clock Miami
Heights
ES‐Install
surge
protec3on,
ceiling
and
light
for
60%
of
classrooms Miami
Springs
Middle‐En3re
fire
alarm
system Morningside
ES‐Par3al
AHU
replacement
unit
ven3lators Morningside
ES‐Upgrade
electrical
panel Natural
Bridge
ES‐Provide
parking
lot,
perimeter
fence North
Transporta3on
Center‐Roofing Orchard
Villa
ES‐Replace
80
ton
chiler Palm
Springs
MS‐FA,
PA
&
Clock Palmefo
MS‐Upgrade
the
overloaded
electrical
service,
also
to
the
labs
222
and
238
to
prevent
circuit
 overload Phillis
Wheatley
ES‐Upgrade
electrical
panel Ruth
Owens
Kruse
Educa3on‐Replace
60
VAV
boxes
and
wall
thermostats School
Board
Administra3on
Complex‐SBAB
Building‐cooling
towers,
pumps,
controls
Phase
1
of
3

Project
Descrip3on

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Skyway
ES‐Chiller,
pumps,
colls William
A.
Chapman
ES‐Replace
cooling
tower
and
main
chillers,
server
room
AC Air
Base
ES‐ADA
Design
Package
No
8 Allapafah
MS‐Chill
water
AHU's,
controls,
VAV
(Chillers
being
replaced
in
08/09) Amelia
Earhart
ES‐Roofing;
Project
#A01095
(pull
out) Bent
Tree
ES‐Upgrade
the
potable
water
system‐possibly
combine
with
ADA Central
East
Transporta3on
Center‐Resurfacing
and
drainage
for
parking
lot Coral
Reef
ES‐ADA
Design
Package
No
8 Coral
Terrace
ES‐ADA
Design
Package
9 David
Fiarchild
ES‐ADA
Design
Package
11 Dr.
Gilbert
L.
Porter
ES‐HVAC
and
Controls
project
00417700‐T&B
inves3ga3on
completed Flagami
ES‐ADA
Design
Package
12

Funding
Required 












247,200
 












472,714
 












394,636
 












458,945
 












381,924
 












108,049
 












655,636
 












675,305
 












445,578
 












458,945
 














46,441
 












432,600
 












472,714
 












636,540
 












337,653
 












616,298
 












420,000
 












432,600
 












458,945
 










1,800,000
 












393,382
 












420,000
 












196,691
 












458,945
 












432,600
 










1,049,018
 












270,000
 












254,616
 












432,000
 












393,382
 












405,183
 












445,578
 












420,000
 










1,012,958
 












458,945
 












445,945
 












445,578
 












540,244
 












420,000
 














99,815
 












157,353
 












284,936
 












340,931
 












675,305
 












784,273
 












445,578
 












458,945
 












131,127
 












865,200
 










1,255,836
 












445,578
 












549,491
 












720,000
 












593,280
 












541,059
 










1,255,836
 












445,578
 












137,684
 












653,014
 












337,653
 












720,000


Jobs 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 12 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14












1,236,000
 












445,578
 












675,305


14 14 14












2,472,000
 












480,000
 












927,000
 












633,330
 










3,795,000
 










1,170,000
 












675,305
 










1,012,958
 












744,640
 












386,273
 












568,729
 












983,454
 












599,377


14 14 14 16 16 16 16 16 16 16 16 16 16

City

State

Program

Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools

Fulford
ES‐ADA
Design
Package
No
8 Glades
MS‐Chiller
plant
replacement‐programming
completed Gloria
Floyd
ES‐HVAC
system Jane
S.
Roberts
K‐8
Center‐Complete
HVAC
water
cooled
chiller
replacement Joella
C.
Good
ES‐Electrical,
ceiling
and
ligh3ng John
F.
Kennedy
MS‐ADA
Design
Package
11 John
G.
Dupuis
ES‐ADA
Design
Package
No
8 Kensington
Park
ES‐Unit
ven3lators
(all
except
cafe/kit
roobop
unit
whichis
being
done
in
08/09)

Project
Descrip3on

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Lakeview
ES‐Roofing Lifle
River
ES‐Repipe
school Mari3me
&
Science
Technology
Academy‐Chill
water
AHU Miami
Springs
Middle‐Replace
cooling
tower
and
chillers North
Miami
Beach
SHS‐AHU
replacement Ojus
ES‐ADA
Design
Package
9 Paul
Lawrence
Dunbar
ES‐Upgrade
electrical
panel Phillis
Wheatley
ES‐Cooling
towers
(cafeteria),
unit
ven3lators,
water‐cooled
units Ponce
De
Leon
MS‐Unit
ven3lators,
new
digital
controls
and
exposed
line
insula3on Region
Maint
Center
4‐Roofing Shadowlawn
ES‐Roofing Toussaint
L'Ouverture
ES‐Roofing William
H.
Turner
Technical‐Air
handler
units
(por3on
that
is
not
funded) Allapafah
MS‐Roofing
Project#00343600 Banyan
ES‐ADA
Design
Package
11 Booker
T.
Washington
SHS‐Unit
ven3lators,
chill
water
AHU,
controls Campbell
Drive
ES‐ADA
Design
Package
11 Citrus
Grove
ES‐ADA
Design
Package
8 Comstock
ES‐ADA
Design
Package
12 Coral
Gables
ES‐Repipe
school Cutler
Ridge
MS‐Roofing Dr.
Gilbert
L.
Porter
ES‐Roofing Eneida
Massas
Hartner
ES‐ADA
Design
Package
11 Golden
Glades
ES‐ADA
Design
Package
9 Gra3gny
ES‐ADA
Design
Package
10 Henry
H.
Filer
MS‐Unit
ven3lators,
Hallway
A/C,
Electrical Homestead
SHS‐Replace
AHU,
controls,
stand
alone
A/C
for
server
room Horace
Mann
MS
Chill
water
AHU,
chillers,
unit
ven3lators Horace
Mann
MS‐Repipe
school Lindsey
Hopkins
Technical‐Ven3lators,
VAV
boxes,
controls,
chilled
water
AHU Mae
M.
Walters
ES‐Roofing;
Project
#00340500 Maya
Angelou
ES‐ADA
Design
Package
No
8 Meadowlane
ES‐ADA
Design
Package
12 Miami
Lakes
MS‐Phase
2
HVAC Miami
Northwestern
SHS‐ADA
Design
Package
No
6 Myrtle
Grove
ES‐Roofing North
Beach
ES‐ADA
Design
Package
9 Norwood
ES‐HVAC Paul
Lawrence
Dunbar
ES‐Repipe
school Rockway
MS‐Roofing School
Board
Administra3on
Complex‐Annex
building‐chilled
water
AHU,
controls Shenandoah
MS‐Repipe
school Southwest
Transporta3on
Center‐Replace
the
cooling
tower,
both
pumps,
piping
and
electrical
for
the
HVAC
 (includes
all
3
trans
centers) Sylvania
Heights
ES‐Roofing W.R.
Thomas
MS‐Roofing William
H.
Turner
Technical‐Roofing Claude
Pepper
ES‐ADA
Design
Package
9 Coconut
Grove
ES‐ADA
Design
Package
11 Cypress
ES‐ADA
Design
Package
10 Emerson
ES‐ADA
Design
Package
12 George
Washington
Carver
ES‐ADA
Design
Package
No
8 Palm
Springs
MS‐Window
replacement South
Pointe
ES‐ADA
Design
Package
12 Springview
ES‐ADA
Design
Package
11 ADA
Design
Package
10 James
H.
Bright
ES‐ADA
Deaign
Package
9
Includes
J.W.
Johnson
ES) North
Glade
ES‐ADA
Design
Package
11 Rockway
ES‐ADA
Design
Package
12 Thomas
Jefferson
MS‐HVAC Westview
MS‐ADA
Design
Package
No
8 ADA
Design
Package
12 Avocado
ES‐ADA
Design
Package
No
8 Ben
Sheppard
ES‐ADA
Design
Package
8 Benjamin
Franklin
ES‐Window
replacement Calusa
ES‐ADA
Design
Package
12 Dr.
Bowman
Foster
Ashe
ES‐ADA
Design
Package
10 Henry
H.
Filer
MS‐Window
replacement Hialeah
SHS‐Window
replacement Joella
C.
Good
ES‐ADA
Design
Package
11

Funding
Required 












170,056
 










3,182,700
 












393,382
 










1,436,000
 












891,156
 












361,712
 












238,400


Jobs 16 16 16 16 16 16 16














950,175
 










1,020,000
 












254,616
 










2,276,000
 












927,000
 










1,909,620
 












271,225
 












445,578
 












900,000
 










1,146,287
 












750,000
 












900,000
 










1,298,160
 










1,200,000
 










1,800,000
 












902,811
 










3,810,450
 












856,077
 












395,893
 












987,209
 












337,653
 










1,700,000
 












985,200
 












302,508
 












293,389
 












892,591
 










1,112,400
 










4,951,585
 










2,962,000
 












540,244
 










2,429,600
 










1,092,644
 












397,742
 












982,295
 










1,909,620
 












168,796
 










1,227,351
 












478,184
 










1,829,616
 












337,653
 










1,450,001
 










5,728,860
 












524,509


16 16 16 16 16 16 16 16 16 16 16 16 16 16 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18














445,578
 










1,413,119
 












775,200
 












738,000
 












531,060
 












785,335
 












859,460
 












794,848
 












613,487
 










1,370,962
 












838,824
 










1,057,903
 










1,034,971
 










1,065,056
 












287,760
 










1,062,660
 










2,661,800
 












107,880
 










1,184,367
 










2,005,604
 










2,344,160
 










3,182,700
 










1,549,076
 










1,381,094
 










1,829,616
 










2,825,382
 










1,467,423


18 18 18 18 20 20 20 20 20 20 20 20 22 22 22 22 22 22 24 24 24 24 24 24 24 24 24

City

State

Program

Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL

Schools Schools Schools Schools Schools Schools Schools

Lake
Stevens
ES‐ADA
Design
Package
10 Lorah
Park
ES‐ADA
Design
Package
10 Madie
Ives
Community
ES‐ADA
Design
Package
11 Miami
Springs
ES‐ADA
Design
Package
No
8 Oak
Grove
ES‐Window
replacement Parkview
ES‐Window
replacement Gra3gny
ES‐Design
window
replacement,
ceiling
and
ligh3ng,
construc3on
11/12,
EMS
and
VAV

Project
Descrip3on

Funding
Required 












705,468
 










1,899,908
 










1,320,202
 










1,423,126
 










1,829,616
 










1,822,254


Jobs 24 24 24 24 24 24

Miami Miami Miami Miami Miami

FL FL FL FL FL

Schools Schools Schools Schools Schools

Miami

FL

Streets/Roads

Lenora
Braynon
Smith
ES‐ADA
Design
Package
10 Liberty
City
ES‐Window
replacement
(FCI
school) Miami
Springs
Middle‐Windows
and
door
replacement
(Buildings
5&6
FCI) Miami
Sunset
SHS‐ADA
Design
Package
No
8 Miami
Shores
ES‐Roof,
fire
alarm,
electrical,
ADA,
elevator,
windows,
structural
repaisrs,
major
paint,
sewer
 connec3on Citywide
Traffic
Circles
D2,
D3
and
D5,
Traffic
Calming
Measures












2,695,578
 










1,584,857
 










3,376,526
 










5,728,860
 










3,239,982


26 26 26 28 28












9,904,170


36














100,000


Miami

FL

Streets/Roads

2

NW
58
Street
Improvements
(Miscellaneous
Street
Paving),
Road
Improvements














174,027


Miami

FL

2

Streets/Roads

Belle
Meade
‐
FPL
Duct
Bank
Supplemental,
Electrical
Supply
to
Belle
Meade
Pump
Sta3on

FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

5 5 5 5 5 10 10 10














844,000


10

Miami

FL

Streets/Roads

Buena
Vista
East
Historic
Dist.
Streetscape,
Drainage
and
Road
Improvements Calle
Ocho
Landscaping
Project,
Landscaping/Beau3fica3on DKM
Emergency
Repairs
Pier
#3
&
#5,
Marina
Repairs
and
Restora3on NW
24th
St
from
12th
to
13th
Ave
Streetscape,
Drainage
and
Road
Improvements 16th
St.
from
27
to
28
Ave.,
Drainage
and
Road
Improvements 18th
St
from
30
to
32
Ave.,
Drainage
and
Road
Improvements Flagami
Traffic
Calming
(including
East
Lifle
Havana),
Traffic
Calming
Measures Miami
River
Greenway
‐
NW
5th
Street
Bridge
Approach,
Miami
River
Greenway
Road
and
Drainage
 Improvements North
Bayshore
Drive
Opera3onal
Improvements,
Traffic
Roundabout
and
Median
Modifica3ons














247,000
 












240,000
 












302,500
 












200,000
 












251,000
 












450,000
 












450,000
 












700,000


Miami Miami Miami Miami Miami Miami Miami Miami














500,000


10

Miami

FL

Streets/Roads

NW
16th
Street
and
16th
Terrace
Streetscape,
Drainage
and
Road
Improvements














450,000


10

Miami

FL

Streets/Roads

NW
18th
Street
Streetscape,
Drainage
and
Road
Improvements














450,000


10

Miami

FL

Streets/Roads

Silver
Bluff
Traffic
calming
Priority
3,
Traffic
Calming
Measures














600,000


10

Miami

FL

Streets/Roads

Storm
Drainage
Master
Plan
Update














650,000


10

Miami

FL

Streets/Roads

Miami
River
Greenway
‐
NW
5th
Street
Extension,
Miami
River
Greenway
Road
and
Drainage
Improvements














844,000


12

Miami

FL

Streets/Roads

Miami
River
Greenway
SE
5th
Street
Extension,
Miami
River
Greenway
Road
and
Drainage
Improvements














844,000


12

Miami

FL

Streets/Roads

Durham
Terrace
Drainage
Improvements,
Drainage
and
Road
Improvements

Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

20 20 20 20 25 30 30 30

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads












1,483,900
 










1,450,000
 










1,500,000
 










1,848,000
 










2,000,000
 










2,000,000
 










2,000,000
 










2,232,000
 










2,541,000
 










2,640,000
 










2,500,000
 










3,000,000


30 30 30 35 40 40 40 40 50 50 50 60












3,000,000


60

Miami

FL

Streets/Roads












2,077,280


60

Miami

FL

Streets/Roads

Miami
River
Greenway
‐
Miami
Circle
Greenway,
Miami
River
Greenway
Improvements Shenandoah
Traffic
Calming
Priority
4,
Traffic
Calming
Measures Traffic
Calming
‐
Grove
area Shenandoah
Traffic
Calming
Phase
2,
Traffic
Calming
Measures Citywide
GIS
archival
registra3on
of
as‐built
documents

 Citywide
Traffic
Study,
Evalua3on
of
Traffic
Calming
Measures Dinner
Key
Mooring,
Boat
Anchorage
and
Upland
Improvements Miami
River
Greenway
2nd
Ave
/
Miami
Ave
Riverwalk
Extension,
Miami
River
Greenway
Road
and
Drainage
 Improvements NW
2nd
Avenue
Road
Improvements,
Drainage
and
Road
Improvements NW
82nd
Street
Traffic
Calming SW
10th
Street
Drainage
Improvements,
Drainage
and
Road
Improvements Brickell
Key
Bridge,
Ridge
Restora3on Coral
Way
Roadway
Improvements
PH
II Intelligent
Transporta3on
System
(ITS)
Devices
on
Bridges
over
the
Miami
River Northwest
14th
Street
Streetscape
Improvements,
Drainage
and
Road
Improvements Bird
Avenue
Road
Improvements,
Drainage
and
Road
Improvements Citywide
Traffic
Control
Measures,
Citywide
Traffic
Calming
Measures Coral
Gate
Wall,
Design
&
Construc3on
of
a
12
foot
concrete
wall City‐wide
Sidewalk
and
ADA
Ramp
installa3on
and
repair Citywide
Storm
Sewer
Drainage
Inlet
Retrofit
‐
retrofit
all
drainage
inlets
with
barrier
screens
to
keep
trash
out
 of
drainage
system Miami
River
Greenway
NW
5th
Street
Bridge
Extension,
Miami
River
Greenway
Road
and
Drainage
 Improvements Miami
River
Greenway
‐
East
Lifle
Havana
,
Miami
River
Greenway
Road
and
Drainage
Improvements












1,000,000
 










1,320,000
 










1,050,000
 












728,500
 










1,213,000
 










1,500,000
 










1,584,000
 










1,773,581













3,808,200


70

Miami

FL

Streets/Roads

City‐wide
Roadway
Resurfacing/Repair
and
Swale
Improvement,
Road
Improvements












4,000,000


80

Miami

FL

Streets/Roads

Garden
Storm
Sewer,
Drainage
and
Road
Improvements












4,110,000


80

Miami

FL

Streets/Roads

N.
Spring
Garden
Greenway
Improvements,
Miami
River
Greenway
Road
and
Drainage
Improvements

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Auburn
Storm
Sewer
Drainage
and
Road
Improvements Brickell
Area
Roadway
and
Street
Improvements City‐wide
Bridge
Repair,
Bridge
Repair
and
Restora3on North
14th
Street
Mul3media
Entertainment
District,
Drainage
and
Road
Improvements Palm
Grove
Road
Improvements,
Drainage
and
Road
Improvements Overtown
Greenway
@
NW
11
Terrace,
Overtown
Greenway
Segment
Improvements Buena
Vista
Heights
Street
Improvements,
Phase
II,
Drainage
and
Road
Improvements North
Bayshore
Drive
Drainage
Improvements,
Drainage
and
Road
Improvements Omni
U3tlity
Improvements Citywide
Bicycle
Facili3es Miami
Baywalk South
Bayshore
Drive
Drive
Roadway
Improvements,
Drainage
and
Road
Improvements Citywide
Traffic
Calming NW
14th
Terr.
Streetscape,
Drainage
and
Road
Improvements Citywide
slab
cover
trenches
cleaning













4,130,710
 










5,320,000
 










5,000,000
 










5,000,000
 










5,064,740
 










5,280,000
 










5,500,000
 










6,112,890
 










5,926,691
 










6,921,000
 










8,000,000
 










8,000,000
 










8,000,000
 








10,000,000
 










9,500,000
 








12,000,000


80 100 100 100 100 100 110 120 120 138 160 160 160 200 200 240

City

State

Program

Miami Miami Miami Miami Miami Miami Miami

FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

SE
Overtown/Park
West
Area
wide
Roadway
and
U3lity
Improvements Citywide
Bridge
Repair/Rehab Miami
River
Greenway
Extension
(west
of
NW
12th
Avenue) Health
District
Streetscape
&
Roadway
Improvements Overtown
Greenway
Phase
2

 Health
District
Roadway
Improvements
and
Streetscapes Downtown
Infrastructure
and
Beau3fica3on
‐
install
ligh3ng,
replace
sidewalk,
add
ADA,
repave,
landscaping

Project
Descrip3on

Funding
Required Jobs 








12,000,000
 240 








13,000,000
 260 








15,000,000
 300 








20,000,000
 400 








20,000,000
 400 








25,000,000
 500

Miami

FL

Streets/Roads

Overtown
Greenway
Phase
II

Miami

FL

Streets/Roads

Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami Miami
Beach

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water CDBG

Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami
Beach Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Airport Airport

Citywide
Storm
Sewer
System
De‐sil3ng
‐
remove
granular
material
from
manholes,
inlets,
cross‐drains,
French
 drains
and
slab‐covered
trenches. Citywide
Drainage
Improvements Coconut
Grove
Roadway
Improvements
(Master
Plan),
Drainage
and
Road
Improvements Port
of
Miami
Tunnel Citywide
Street
Resurfacing
‐
mill
and
resurface
all
City
streets Overtown/Park
West
Trolley Brickell
Trolley
‐
Rubberized Downtown/Midtown
Trolley Miami
Streetcar Metromover
Brickell
Loop
Extension Metromover
Extension
to
Marlins
Stadium South
Florida
East
Coast
Corridor
(SFECC)
Transit
Extension Albert
Pallot
Park
Shoreline
Stabiliza3on Dinner
Key
Dredging
Mi3ga3on,
Maintenance
Dredging
and
Environmental
Mi3ga3on Fern
Isle
Waterway
Cleaning Ademar
and
Davis
Canal
Dredging
Project City
wide
storm
inlets
survey
data
collec3on Wagner
Creek
sta3onary
trash
screen
 City
wide
storm
water
ouzalls
retrofiqng Storm
water
pump
sta3ons
rehabilita3on Wagner
Creek
Seybold
Canal
Environmental
Cleanup
and
Dredging Citywide
Canal
Maintenance
Dredging Bicentennial
Park
Sewer
&
Water
Treatment
Plant
Reloca3on Seawalls
‐
This
project
would
qualify
for
the
EPA's
Nonpoint
Grant
Program.
No
EPA
type
category,
so
placed
in
 CDBG. Bridge
Repair Citywide
Street
Resurfacing Sunset
Harbor
Parking
Garage Sanitary
Sewer
Manhole
Rehab North
Shore
Neighborhood
Improvements West
Avenue/Bay
Road
Infrastructure Oceanfront
Neighborhood
Improvements Collins
Avenue
Main Sunset
&
Vene3an
Island
Force
Mains Nau3lus,
Normandy
Shores
and
Normandy
Isle
Neighborhood
Infrastructure Sunset,
Vene3an,
Palm,
Star
&
Hibiscus
Island
Improvements La
Gorce
Neighborhood
Improvements Biscayne
Point
Neighborhood
Improvements South
Pointe
Pump
Sta3on Bayshore
Neighborhood
Right
Of
Way
Infrastructure
 Flamingo
Neighborhood
Right
Of
Way
Infrastructure Runway
27
Threshold
Reloca3on
at
Miami
Interna3onal
Airport Airport‐
Miami
Interna3onal
Airport
(MIA)
‐
Construc3on
of
double
bofom
Fuel
Tanks
for
safety


Miami‐Dade

FL

Airport

Construct
New
FAA
Air‐Traffic
Control
Tower
(ATCT)
at
Opa‐locka
Execu3ve
Airport.












1,900,000


80

Miami‐Dade

FL

Airport

Airport‐
Kendall‐Tamiami
Execu3ve
Airport
(TMB)
Capacity
Project
‐
Construct
runway
9R‐27L
extension










13,000,000


120

Miami‐Dade

FL

Airport

Construct
Security
&
Opera3ons
Command
Center
at
Miami
Interna3onal
Airport










15,000,000


160

Miami‐Dade

FL

Airport

North
Terminal
Development
Program
at
MIA.










61,000,000


300

Miami‐Dade

FL

CDBG

Port
of
Miami‐Roadway
improvements
and
poten3al
con3ngency
costs
related
to
the
Seaport
Tunnel

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Electrical
service
installa3on
at
Larchmount
Park Sewer
connec3on
improvements
at
Blue
Lakes
Park Sewer
connec3on
improvements
at
Ron
Ehman
Park Cruise
Terminal
D
New
Canopies
(Intermodal)
at
Port. Cruise
Terminal
D
New
Canopies
(Parking
Garage)
at
Port. Port
of
Miami‐Install3on
and
construc3on
of
new
canopies
at
the
cargo
gates Replace
exis3ng
CCTV
Video
Recording
System
and
improvements
to
Records
Room
equipment










43,500,000
 












250,000
 












160,000
 












260,000
 












828,000
 












754,200
 












526,000


0 2 2 2 3 3 3

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG














500,000
 












680,000
 












510,000
 












800,000
 












120,000
 










1,475,000
 










1,000,000
 










1,780,000
 










1,900,000
 










1,800,000
 










4,900,000


3 4 5 5 7 8 10 10 10 10 10

Miami‐Dade

FL

CDBG

Drainage
improvements
at
Gwen
Cherry
Park Construct
Home
Chemical
Collec3on
Center
for
secure
disposal
of
hazardous
chemicals Sewer
connec3on
improvements
at
Gwen
Cherry
Park Provide
electrical
backup
system
improvements
to
the
County's
radio
system Seawall
repair
and
improvements
at
Crandon
Park Expand
exis3ng
parking
lot
at
the
North
Dade
Jus3ce
Center Facility
improvements
and
repairs
at
various
Public
Safety
facili3es
 Port
of
Miami‐Construc3on
of
Cargo
Yard
Warehouse
CIPS Port
of
Miami‐Cruise
Terminal
B
&
C
Security
Upgrades Port
of
Miami‐Improvements
to
Command
&
Control
building
including
migra3on
of
IT,
CBP
Reloca3on
and
 Drainage
improvements
in
the
area
of
West
Goulds
located
in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
 Area Provide
shufers
and
impact
windows
for
the
Regional
Dade
Processing
Center














880,000
 












600,000


13 14










30,000,000


600










30,000,000


600










45,000,000
 








50,000,000
 








50,000,000
 






100,000,000
 






175,000,000
 












500,000
 












800,000
 










1,500,000
 






280,000,000
 








80,000,000
 






150,000,000
 






300,000,000
 










1,200,000
 










2,300,000
 










2,000,000
 










3,927,400
 










5,000,000
 










5,000,000
 








12,000,000
 








12,000,000
 








17,000,000
 








30,000,000
 






100,000,000


900 1000 1000 2000 3500 5 12 23 560 600 3000 6000 24 40 40 79 100 100 240 240 350 600 2000












4,800,228
 










1,425,000
 










1,947,000
 








22,892,000
 










1,000,000
 












147,000
 












147,000
 












896,066
 










1,400,000
 










2,500,000
 










4,189,919
 










5,204,928
 










5,918,054
 










9,738,840
 








18,603,498
 








29,950,577
 








45,788,888
 










1,500,000


116 29 39 458












6,000,000


40

3 3 18 28 50 84 104 118 195 372 599 916 30

City

State

Program

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Port
of
Miami‐Design,
Planning,
and
Environmental
Improvements
for
Dredge
III Port
of
Miami‐Surface
parking
improvements
at
Terminal
C Construct
evidence
storage
facility
and
parking
area Port
of
Miami‐Design
Bulkhead
rehabilita3on
Wharf
165‐177 Port
of
Miami‐Design
for
Dredge
III
Buckhead
strengthening Port
of
Miami‐Dolphin
Mooring
Exen3on Repair
terra
cofa
facade
and
replace
windows
at
the
Dade
County
Courthouse Replace
domes3c
and
sanitary
risers
at
Dade
County
Courthouse Replace
electrical
riser
at
Dade
County
Courthouse Replace
exterior
pavers
and
repair
sidewalks
at
the
Stephen
P.
Clark
Government
Center Replacement
Manatee
Gate
for
Canal
#2
at
Miami
Interna3onal
Airport Construct
bed
radiology
recovery
unit
at
Jackson Establish
Credit
Facility
for
Small
Business
Support
 Implement
local
capital
projects
for
disastor
mi3ga3on
strategy
and
climate
change
adapta3on

Project
Descrip3on

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

CDBG CDBG CDBG

Repair
and
replace
shelters
and
other
park
facili3es
at
regional
and
local
parks Develop
exis3ng
site
and
construct
new
regional
Arcola
Head
Start
Center Build‐out
exis3ng
shell
space
and
provide
infrastructure
equipement
for
emergency
management
func3ons

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

CDBG CDBG CDBG

Construc3on
Sewer
Booster
Pump
sta3on
at
Miami
Interna3onal
Airport Drainage
improvements
at
J.G.
Head's
subdivision
in
Central
Miami‐Dade Implement
job
retraining
program
to
s3mulate
and
address
two‐year
job
loss
from
construc3on
industry

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy

Improve
Jackson
North
Medical
Center
including
construc3on
and
equipment
upgrades Port
of
Miami‐Gantry
Crane
Electrifica3on
and
upgrades Demolish
and
construct
new
regional
Wynwood
Neighborhood
Service
Center Animal
Services
‐
construct
new
shelter
to
replace
defunct
facility Construc3on
of
a
K‐9
Facility
at
Miami
Interna3onal
Airport Port
of
Miami‐Seaboard
Marine
Improvements
Phase
II
&
III Port
of
Miami‐Repair
FEC
Rail
Road
bbascular
bridge Design
and
construct
new
pediatric
tower
at
Holtz
Children's
Hospital Construct
Krome
Deten3on
Center
jail
facility
with
system‐wide
central
support
facility Port
of
Miami‐Repair
vehicular
bascular
bridge Port
of
Miami‐Bulkhead
2
and
3
Rehabilita3on
Improvements
 Port
of
Miami‐Cruise
Terminal
B&C
New
Passenger
Boarding
Bridges Port
of
Miami‐Cruise
Terminal
D&E
New
Passenger
Boarding
Bridges Port
of
Miami‐Cruise
Terminal
J
Remodeling General
Services
Administra3on
‐
911
Answerpoint
(Replace
cooling
tower
and
fibeen
air
handlers)

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

General
Services
Administra3on
‐
Medical
Examiner's
Building
Mi3ga3on
Hardening
(Provide
shufers
and
 energy
efficient
impact
windows
for
the
Medical
Examiner’s
building) General
Services
Administra3on
‐
Provide
monitoring
of
power
systems
for
the
Regional
Data
Processing
and
 Communica3ons,
911,
Fire
and
Police
Dispatch
building General
Services
Administra3on‐
Miami‐Dade
County
Facili3es
Smart‐Meter
Retrofit
(Energy
Management
 Submetering
Project;
Installa3on
of
meters
to
measure
energy
use
in
cri3cal
County
buildings
in
real
3me
 enabling
energy
analy3cal
and
cost
reduc3on General
Services
Administra3on‐
Water
Efficiency
Retrofit
Program

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade Miami‐Dade

FL FL

Energy Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade Miami‐Dade

FL FL

Energy Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

General
Services
Administra3on
‐
Elec3ons
Headquarters/311
Building
Hardening
(Provide
shufers
and
energy
 efficient
impact
windows
for
the
Elec3ons
Headquarters
/
311
Answer
Center.

Improve
grounding
and
 reinforce
roof) General
Services
Administra3on
‐
GSA
Integrated
Command
Center
Monitoring
System
(Provide
monitoring
of
 power
systems
for
the
Integrated
Command
Center) Office
of
Sustainability‐
Implementa3on
of
a
training
program
for
contractors
focused
on
energy
efficiency
and
 renewable
energy
systems;
to
complement
efforts
to
improve
residen3al
and
commercial
accessibility
(cost
 and
supply
of
goods
and
services)
 Public
Housing
‐
Ward
Towers
Window
Replacement
(Ward
Towers
window
replacement
with
impact
resistant,
 energy
efficient
windows
for
the
exis3ng
high
rise
building) Solid
Waste
Management
‐
South
Dade
Cell
4
Gas
Extrac3on
and
Odor
Control
(Install
methane
gas
extrac3on
 system
for
reuse) General
Service
Administra3on
(GSA)
Children’s
Courthouse
Cool
/
Green
Roof
installa3on. Water
and
Sewer
‐
Installa3on
of
two
biogas
fueled
cogenera3on
units
at
the
SDWWTP.

These
units
will
allow
 the
Department
to
fully
u3lize
biogas
generated
at
the
plant
from
the
diges3on
of
bio‐solids
and
from
the
 adjacent
South
Dade General
Services
Administra3on
‐
BMS
Controls
at
three
County
Sites
(Replace
obsolete
building
controls
at
 three
county
sites) General
Services
Administra3on
‐
Coral
Gables
Courthouse
(Green
Roof
replacement) Public
Housing
‐
Modello
Family
Development
Comprehensive
Moderniza3on
(Comprehensive
moderniza3on
 including
energy
efficiency
improvements
for
120
public
housing
units) Seaport
‐
Solar
power
installa3on
on
SeaPort
Terminal
Roof
(500
KW) General
Services
Administra3on
‐
Solar
Power
for
the
Integrated
Command
Center
(Solar
power
installa3on
on
 roof
of
GSA
Integrated
Command
Center
including
energy
efficient/Cat
V
roof
Replacement) General
Services
Administra3on
‐
North
Dade
Jus3ce
Center
(Green
Roof
replacement) Office
of
Sustainability
‐
Pilot
installa3on
of
solar
thermal
renewable
energy
systems
at
1000
homes
including
 feasibility
analysis
of
financing
strategy
and
billing
infrastructure
system
to
enable
larger‐scale
implementa3on. Avia3on
Department
‐
Airport
Solar
Installa3on
(Solar
power
installa3on
at
Airport
on
por3on
of
terminal
roof
 (1MW)) General
Services
Administra3on
‐
Cultural
Center
Plaza
(Replace
Cultural
Center
Plaza
pedestrian
roof
to
 mi3gate
structural
decay
and
water
leaks
including
"cool
roof"
energy
improvements.) General
Services
Administra3on
‐
Dade
County
Courthouse
(Replace
outdated
air
condi3oning
system
with
 new
energy
efficient
system
to
reduce
cooling
load
and
energy
consump3on) General
Services
Administra3on‐
Cogenera3on
Plant
for
Downtown
Government
Center
Buildings

Funding
Required Jobs 






156,000,000
 15 












928,000
 17 










3,000,000
 20 










3,500,000
 20 










4,000,000
 20 










1,900,000
 20 








28,000,000
 20 










3,000,000
 20 










4,000,000
 20 










3,000,000
 20 












300,000
 20 










9,500,000
 25 








53,500,000
 25 










6,000,000
 








15,000,000
 










9,000,000


25 25 35










29,388,000
 










2,600,000
 










3,300,000


40 40 40










16,875,000
 










9,004,000
 










5,847,596
 








15,000,000
 








25,000,000
 










4,500,000
 








10,000,000
 










3,837,397
 








44,000,000
 






352,000,000
 










7,566,735
 








15,145,313
 










3,900,000
 










3,900,000
 










5,780,000


40 45 45 50 75 90 100 144 150 275 284 288 375 375 380












5,000,000


5












2,000,000


5














300,000


5












1,500,000


7












1,500,000


7












2,000,000


10














300,000


10














200,000


10












2,500,000


10












1,500,000


10














100,000


15












4,800,000


15












8,000,000
 












410,000


20 20












2,600,000


20












2,500,000


20












7,500,000
 












800,000


24 25












7,500,000


25












4,000,000


30












8,000,000


40












5,000,000


40










15,000,000


75

City

State

Program

Miami‐Dade

FL

Energy

Project
Descrip3on

Funding
Required

Miami‐Dade

FL

Energy

Miami‐Dade

FL

Energy

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

Housing Housing Housing

Miami‐Dade

FL

Housing

Miami‐Dade

FL

Housing

Miami‐Dade

FL

Housing

Miami‐Dade

FL

Public
Safety

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

Public
Safety Public
Safety Public
Safety

Miami‐Dade

FL

Public
Safety

31.)
Community
Policing‐
City
of
Opa
Locka
School
Resource
Officer
Project,
The
SRO's
will
provide
preven3on
 educa3on,
counseling
and
mentoring
for
students
in
the
local
elementary
school
using
the
Ambassador
 curriculum.
This
unique
program
whose
design Community
Policing‐
City
of
Aventura
Schools
Resource
Officer
Project Community
Policing‐
City
of
Coral
Gables
Criminal
Jus3ce
Records
Improvement
Project Community
Policing‐
City
of
Coral
Gables
Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
handheld
 E‐Ticke3ng
devices;
implementa3on
of
this
technological
upgrade
has
reduced
the
3me
an
officer
spends
 handling
traffic
stops;
minimized
the
resu Community
Policing‐
City
of
Florida
City
Criminal
Jus3ce
Records
Improvement
Project

Miami‐Dade

FL

Public
Safety

Community
Policing‐
City
of
Hialeah
Gardens
Criminal
Jus3ce
Records
Improvement
Project

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Community
Policing‐
City
of
Miami
Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field
 report
entry
in
the
Records
Unit
Grant
funds
will
enable
the
Records
Unit
to
eliminate
the
backlog
of
reports
 entered
into
the
Department's
LRMS, Community
Policing‐
City
of
Miami
Springs
Criminal
Jus3ce
Records
Improvement
Project,
Miami
Spring
 proposes
to
use
JAG
funds
to
allow
staff
on
an
over3me
basis
to
scan,
index,
and
destroy
imaged
paper
records
 as
appropriate. Community
Policing‐
City
of
North
Bay
Village
Criminal
Jus3ce
Records
Improvement
Project,
The
North
Bay
 Village
Police
Department
has
used
grant
funds
to
help
improve
their
criminal
jus3ce
records
management
 system
North
Bay
Village
proposes
to
purchas Community
Policing‐
City
of
West
Miami
Criminal
Jus3ce
Records
Improvement
Project,
the
Department
 wishes
to
purchase
handheld
electronic
3cke3ng
devices
for
the
patrol
unit.
The
use
of
electronic
3cke3ng
 devices
will
reduce
the
3me
needed
 Community
Policing‐
Intensive
Day/Night
Treatment
Program

Miami‐Dade

FL

Public
Safety

Community
Policing‐
Miami‐Dade
County
automated
arrest
(A‐Forms)
Project

Miami‐Dade

FL

Public
Safety

Community
Policing‐
Miami‐Dade
Police
Department
Crime
Preven3on
Awareness
Project

Miami‐Dade

FL

Public
Safety

Community
Policing‐
Town
of
Cutler
Bay
Domes3c
Violence
Project

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Community
Policing‐
Town
of
Miami
Lakes
School
Resource
Officer
Project,
Miami
Lakes
Police
Department
will
 con3nue
to
use
JAG
funds
to
provide
interven3on
and
preven3on
services
to
local
youth;
crime
preven3on
 presenta3ons
and
conduct
truancy
sweeps Police‐
Strategic
Enforcement
Opera3ons
Strategy












5,000,000


Miami‐Dade

FL

Public
Safety

Automated
arrest
(A‐Forms)
Project
for
Miami‐Dade
Police
Department.












2,000,000


0

Miami‐Dade

FL

Public
Safety

Crime
Preven3on
Display
Vehicle
for
Miami‐Dade
Police
Department.














130,000


0

Miami‐Dade

FL

Public
Safety

















4,405


0

Miami‐Dade

FL

Public
Safety

















2,739


0

Miami‐Dade

FL

Public
Safety

















2,452


0

Miami‐Dade

FL

Public
Safety

Criminal
Jus3ce
Records
Improvement
Project
proposes
to
use
JAG
funds
to
allow
staff
on
an
over3me
basis
to
 scan,
index,
and
destroy
imaged
paper
records
as
appropriate. Criminal
Jus3ce
Records
Improvement
Project,
a
move
from
a
system
of
manuals
and
forms
to
electronic
 format
that
members
can
access
via
computer. Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
2
E‐Ticke3ng
devices
for
Officers
to
be
used
in
the
 field
for
scanning
driver's
licenses. Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
handheld
E‐Ticke3ng
devices.

















7,982


0

Miami‐Dade

FL

Public
Safety

















2,409


0

Miami‐Dade

FL

Public
Safety

Criminal
Jus3ce
Records
Improvement
Project,
purchase
of
sobware
to
enable
officers
to
access
FCIC/NCIC
 directly. Criminal
Jus3ce
Records
Improvement
Project,
the

















3,976


0

Miami‐Dade

FL

Public
Safety

Criminal
Jus3ce
Records
Improvement
Project,
the
purchase
of
an
Internet‐based
data
sharing
system.
















15,352


0

Miami‐Dade

FL

Public
Safety
















23,848


0

Miami‐Dade

FL

Public
Safety

Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field
report
entry
in
the
Records
Unit
Grant
 funds. Criminal
Jus3ce
Records
Improvement
Project,
to
fully
automate
field
report
entry
in
the
Records
Unit.
















23,848


0

Miami‐Dade

FL

Public
Safety

















3,448


0

Miami‐Dade

FL

Public
Safety

















3,318


0

Miami‐Dade

FL

Public
Safety

















5,130


0

Miami‐Dade

FL

Public
Safety

















3,174


0

Miami‐Dade

FL

Public
Safety

Miami‐Dade Miami‐Dade

FL FL

Public
Safety Public
Safety
















14,179
 















3,806


0 0

















3,448


0

Miami‐Dade

FL

Public
Safety

















4,664


0

Miami‐Dade

FL

Public
Safety

















3,174


0

Public
Housing
‐
Roof
Replacements
(Green
Roof
replacement
throughout
MDHA
housing
projects
including
 








15,000,000
 solar
applica3ons
where
feasible) Public
Health
Trust
‐
Jackson
Hospital
Miscellaneous
Construc3on
Projects
(Construct
renewal
and
replacement
 projects
throughout
the
system
including
green/energy
efficient
projects
such
as
cool
roofs
and
more
efficient
 






122,000,000
 building
management
systems
to
red General
Services
Administra3on‐
Capacity
Expansion
of
Thermal
Storage
District
Cooling
Loop
(Improve
Chilled
 Water
Loop;
Expand
produc3on
and
distribu3on
capacity
of
GSA
thermal
storage
(ice)
district
cooling
loop
to
 








25,000,000
 reduce
facility
energy
consump3on 










9,400,000
 Elevator
repairs
of
Public
Housing
Authority
high
rise
buildings
and
UFAS
compliance. 








12,000,000
 Concrete
structural
repairs
to
high
rise
buildings
for
elderly
residents. 










9,654,600
 Parking
lot
improvements
and
upgrades
at
105
sites
for
Uniform
Federal
Accessibility
Standards
compliance. 










9,296,100
 Exterior
pain3ng
of
105
public
housing
developments. Uniform
Federal
Accessibility
Standards
improvements
to
managers’
offices,
dining
rooms,
community
centers
 in
Miami‐Dade
Housing
Agency Uniform
Federal
Accessibility
Standards
improvements
to
unit
interiors
of
public
housing
units
(over
105
sites).

Criminal
Jus3ce
Records
Improvement
Project,
to
help
improve
criminal
jus3ce
records
management
system
by
 purchasing
two
computers. Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
handheld
electronic
3cke3ng
devices
for
the
patrol
 unit. Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
new
sobware
upgrade
agreement. Criminal
Jus3ce
Records
Improvement
Project,
to
purchase
sobware
and
hardware
including
personal
data
 assistants
(PDA's)
used
to
access
criminal
jus3ce
informa3on
data. Criminal
Jus3ce
Records
Improvement
Project,
to
replace
and
upgrade
Computer
Aided
Dispatch
and
Records
 management
System. Criminal
Jus3ce
Records
Improvement
Project,
upgrade
the
department’s
record
system. Criminal
Jus3ce
Records
Improvement
Project:
Move
from
paper‐based
to
electronic
records. Criminal
Jus3ce
Records
Improvement
Project:
Purchase
of
a
Network
Storage
Device
along
with
any
required
 accessories
and
or
moun3ng
hardware. Criminal
Jus3ce
Records
Improvement
Project:
Purchase
of
sobware
and
hardware
including
personal
data
 assistants
(PDA's)
used
to
access
criminal
jus3ce
informa3on
data.

Jobs 75

100

125 5 20 45 50










25,000,000


50










30,000,000


50

















4,508
 















5,853
 















7,982


















7,982
 















3,158
 















5,130

















23,848


















4,405


















3,448


















3,318
 












302,300
 










2,000,000
 












130,000
 















6,865


















5,554


City

State

Program

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Public
Safety

Miami‐Dade

FL

Miami‐Dade

Project
Descrip3on

Funding
Required

Jobs

Criminal
Jus3ce
Records
Improvement
Project:
The
department
is
proposing
to
purchase
two
addi3onal
laptop
 computers
for
the
patrol
unit. Criminal
Jus3ce
Records
Improvement
Project:
Transi3on
from
manuals
and
forms
to
electronic
format.

















3,976


0

















2,739


0

















4,405


0

Public
Safety

Criminal
Jus3ce
Records
Improvement
Project:
Use
of
JAG
funds
to
allow
staff
on
an
over3me
basis
to
scan,
 index,
and
destroy
imaged
paper
records
as
appropriate. Domes3c
Violence
Project,
to
expand
their
efforts
to
educate
youth
on
domes3c
abuse
issues.

















8,348


0

FL

Public
Safety

Domes3c
Violence
Project,
to
hire
a
Family
Crimes
Domes3c
Violence
Coordinator.
















31,181


0

Miami‐Dade

FL

Public
Safety

Domes3c
Violence
Project:
Educa3on
and

















4,328


0

Miami‐Dade

FL

Public
Safety

Intensive
Day/Night
Treatment
Program.














302,300


0

Miami‐Dade

FL

Public
Safety

Radio
enhancement
to
support
2,600
radios
for
Miami‐Dade
Police
Department.










11,000,000


0

Miami‐Dade

FL

Public
Safety

Resource
Officer
Project,
Officers
will
teach
the
RADKids
curriculum
in
10
of
the
city’s
schools.
















23,848


0

Miami‐Dade

FL

Public
Safety

















5,554


0

Miami‐Dade

FL

Public
Safety

















5,090


0

Miami‐Dade

FL

Public
Safety

















4,508


0

Miami‐Dade

FL

Public
Safety

School
Resource
Officer
Project,
con3nued
use
of
JAG
funds
to
provide
interven3on
and
preven3on
services
to
 local
youth. School
Resource
Officer
Project,
purchase
of
program
equipment
and
supplies
necessary
to
maintain
and
 enhance
exis3ng
SRO
program. School
Resource
Officer
Project,
The
SRO's
will
provide
preven3on
educa3on,
counseling
and
mentoring
for
 students
in
the
local
elementary
school
using
the
Ambassador
curriculum. School
Resource
Officer
Project:
to
provide
preven3on
educa3on,
counseling
and
mentoring
for
students.

















4,508


0

Miami‐Dade

FL

Public
Safety

Targeted
enforcement
suppression
efforts
for
Miami‐Dade
Police
Department.












5,000,000


0

Miami‐Dade

FL

Public
Safety

Violent
Crime
Ini3a3ves
Community
Policing
Strategy
for
Miami‐Dade
Police
Department.












5,000,000


0

Miami‐Dade

FL

Public
Safety












6,800,000


4

Miami‐Dade

FL

Public
Safety

Mobile
Automated
Fingerprint
Informa3on
System,
e‐Cita3on,
automated
field
repor3ng
for
Miami‐Dade
 Police
Department. Police‐
Mission
Cri3cal
Technology












6,800,000


4

Miami‐Dade

FL

Streets/Roads
















28,500


3

Miami‐Dade

FL

Streets/Roads
















28,500


3

Miami‐Dade

FL

Streets/Roads
















28,500


3

Miami‐Dade

FL

Streets/Roads
















28,500


3

Miami‐Dade

FL

Streets/Roads
















48,000


4

Miami‐Dade

FL

Streets/Roads
















48,000


4

Miami‐Dade

FL

Streets/Roads
















40,000


4

Miami‐Dade

FL

Streets/Roads
















48,000


4

Miami‐Dade

FL

Streets/Roads
















48,000


4

Miami‐Dade

FL

Streets/Roads
















48,000


4

Miami‐Dade

FL

Streets/Roads














758,000


5

Miami‐Dade

FL

Streets/Roads
















67,000


5

Miami‐Dade

FL

Streets/Roads
















67,000


5

Miami‐Dade

FL

Streets/Roads
















67,000


5

Miami‐Dade

FL

Streets/Roads














800,000


5

Miami‐Dade

FL

Streets/Roads
















76,500


6

Miami‐Dade

FL

Streets/Roads
















76,500


6

Miami‐Dade

FL

Streets/Roads
















76,500


6

Miami‐Dade

FL

Streets/Roads














120,000


6

Miami‐Dade

FL

Streets/Roads
















76,500


6

Miami‐Dade

FL

Streets/Roads














200,000


10

Miami‐Dade

FL

Streets/Roads














220,000


10

Miami‐Dade

FL

Streets/Roads














240,000


10

Miami‐Dade

FL

Streets/Roads














240,000


10

Miami‐Dade

FL

Streets/Roads














494,000


11

Miami‐Dade

FL

Streets/Roads
















32,500


11

Miami‐Dade

FL

Streets/Roads
















92,300


11

Miami‐Dade

FL

Streets/Roads














126,100


11

Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
35
AVE
from
NW
30
ST
to
NW
35
ST
located
in
 the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
75
ST
from
NW
14
AVE
to
NW
17
AVE
located
 in
the
Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
192
ST
from
SW
117
AVE
to
SW
114
AVE
 located
in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
272
ST
from
SW
145
AVE
to
SW
142
AVE
 located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
20
Ave
from
87
ST
to
NW
95
ST
located
in
the
 West
Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
27
ST
from
NW
32
AVE
to
NW
27
AVE
located
 in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
102
AVE
from
SW
176
ST
to
SW
182
ST
located
 in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
104
AVE
from
SW
176
ST
to
SW
184
ST
located
 in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
142
AVE
from
SW
256
ST
to
SW
240
AVE
 located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
147
AVE
from
SW
288
ST
to
SW
296
ST
located
 in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 Greenway
Bridges
‐
Biscayne
and
Black
Creek
Trail Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
29
AVE
from
NW
21
ST
to
NW
32
ST
located
in
 the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
35
ST
from
NW
37
AVE
to
NW
30
AVE
located
 in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
252
ST
from
SW
137
AVE
to
SW
147
AVE
 located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 Snake
Creek
Greenway
Overpass
at
I‐95/South
Florida
Rail
Corridor Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
30
AVE
from
NW
22
ST
to
NW
35
ST
located
in
 the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
30
ST
from
NW
27
AVE
to
NW
35
AVE
located
 in
the
Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
NW
46
ST
from
NW
19
AVE
to
NW
27
AVE
located
 in
the
Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
180
ST
from
SW
102
AVE
to
SW
112
AVE
 located
in
the
Perrine
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
264
ST
from
SW
137
AVE
to
SW
145
AVE
 located
in
the
Leisure
City

Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
State
Road
9
from
golden
glades
to
NW
22
AVE
 located
in
the
Opa‐Locka
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
1 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
112
AVE
from
SW
248
ST
to
SW
211
ST
located
 in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
232
ST
from
SW
112
AVE
to
SW
87
AVE
located
 in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
8 Public
Works‐
Landscaping
and
beau3fica3on
in
the
area
of
SW
248
ST
from
SW
112
AVE
to
87
AVE
located
in
 the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
Districts
8
and
9 Public
Works
‐
sidewalk
improvements
SW
216
St
and
SW
224
St
from
SW
112
Ave
to
SW
117
Ave Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
21
Av.
&
94
St.
‐
95
St.
located
in
the
West
Lifle
River
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
23
Av.
&
91
St.
‐
95
St.
located
in
the
West
Lifle
River
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
64
St.
‐
65
St.
&
NW
21
Av.
‐
22
Av.
located
in
the
 Model
City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2

City

State

Program

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Miami‐Dade

Project
Descrip3on

Funding
Required

Jobs

Streets/Roads

Public
Works‐
Sidewalk
Improvements
in
the
area
of
NW
91
St.
‐
95
St.
&
NW
22
Av.
‐
24
Av.
located
in
the
West
 Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Sidewalk
Improvements
in
the
area
of
SW
122
Av.
&
216
St.
‐
223
St.
located
in
the
Goulds
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works
‐
drainage
improvement
12420
SW
218
St Public
Works
‐
drainage
improvement
NW
22
Ave
from
NW
54
St
to
NW
56
St Public
Works
‐
drainage
improvement
NW
77
St
in
3003
block
to
3012
block Public
Works
‐
drainage
improvements
at
NW
37
Ave
and
NW
41
St Public
Works
‐
drainage
improvment
3300
block
of
NW
41
St Public
Works
‐
roadway
improvements
to
NW
77
Terrace
from
NW
22
Ave
to
NW
24
Ave Public
Works
‐
roadway
improvements
to
West
Guava
Street
and
Duval
Avenue Public
Works‐
Drainage
Improvements
in
the
area
of
10820
SW
200
Dr
located
in
the
Perrine
Neighborhood
 Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Drainage
Improvements
in
the
area
of
11261
SW
220th
St
located
in
the
Goulds
Neighborhood
 Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Drainage
Improvements
in
the
area
of
2411
‐2441
NW
65
ST

located
in
the
Model
City
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Drainage
Improvements
in
the
area
of
27100
SW
142
CT
located
in
the
Leisure
City
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Drainage
Improvements
in
the
area
of
2740
NW
44th
St
(W/O
NW
27
Ave)
located
in
the
Model
 City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 Public
Works‐
Drainage
Improvements
in
the
area
of
5573
NW
24
Ave
(E/O
NW
24th
Ave)
located
in
the
Model
 City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 Public
Works‐
Drainage
Improvements
in
the
area
of
773
NW
75
St
(W/O
NW
7
Ave)
located
in
the
Model
City
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Public
Works‐
Drainage
Improvements
in
the
area
of
NW
65th
St
W/O
NW
18th
Ave
located
in
the
Model
City
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
2 Roadway
improvements
and
beau3fica3on:
Vene3an
Causeway
Streetscape.

FL

Streets/Roads

Transit‐Develop
and
deploy
Bridge
Inspec3on
and
Track
Infrastructure
Management
System












3,088,000


15

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
in
area
bounded
by
SW
264
St
and
SW
272
St
from
SW
137
to
SW
147
Ave














650,000


20

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
in
area
bounded
by
SW
264
St
and
SW
272
St
from
SW
137
to
SW
147
Ave

Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Public
Works
‐
roadway
resurfacing
NE
10
Ave Public
Works
‐
roadway
resurfacing
NW
12
Ave
from
NW
71
St
to
NW
79
St Public
Works
‐
roadway
resurfacing
NW
17
Ave
from
NW
71
St
to
NW
79
St Public
Works
‐
roadway
resurfacing
NW
22
Ave
and
NW
27
Ave
from
NW
62
St
to
NW
71
St Public
Works
‐
roadway
resurfacing
NW
54
St
and
NW
62
St
from
NW
17
Ave
to
NW
22
Ave Public
Works
‐
roadway
resurfacing
NW
71
St
and
NW
79
St
from
NW
27
Ave
to
NW
37
Ave Public
Works
‐
roadway
resurfacing
NW
71
St
from
NW
12
Ave
to
NW
17
Ave Public
Works
‐
roadway
resurfacing
SW
107
Ave
and
SW
117
Ave
from
SW
211
St
to
SW
216
St














650,000
 












275,000
 












570,000
 












570,000
 












850,000
 












475,000
 












930,000
 












570,000


20 20 20 20 20 20 20 20














211,000


20

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
SW
157
Ave
from
SW
280
St
to
SW
308
St














465,000


20

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
SW
216
St
and
SW
232
St
from
SW
97
Ave
to
SW
107
Ave

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

Streets/Roads Streets/Roads Streets/Roads

Public
Works
‐
roadway
resurfacing
SW
216
St
from
US
1
to
SW
112
Ave Public
Works
‐
roadway
resurfacing
SW
248
St
from
US
1
to
SW
147
Ave Public
Works
‐
roadway
resurfacing
SW
288
St
and
SW
296
St
from
SW
147
Ave
to
SW
157
Ave














787,000
 












285,000
 












410,000


20 20 20

Miami‐Dade Miami‐Dade Miami‐Dade

FL FL FL

Streets/Roads Streets/Roads Streets/Roads














910,000
 












380,000
 












915,000


20 20 20
















70,000


20

Miami‐Dade

FL

Streets/Roads














120,000


20

Miami‐Dade

FL

Streets/Roads














211,000


20

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
SW
296
St
from
SW
157
Ave
to
SW177
Ave Public
Works
‐
roadway
resurfacing
SW
84
St
from
US
1
to
SW
112
Ave Public
Works‐
Resurfacing
of
roadways
in
the
area
of
NE
17
ST
(N
MIAMI
AVE
‐
NE
1
AVE)
located
in
the
Model
 City
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 Public
Works‐
Resurfacing
of
roadways
in
the
area
of
NW
38
ST
(NW
22
AVE
‐
NW
27
AVE)
located
in
the
 Melrose
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
3 Public
Works‐
Resurfacing
of
roadways
in
the
area
of
SW
107
AVE‐SW
117
AVE
&
SW
211
ST
‐
SW
216
ST
 located
in
the
Goulds
Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works‐
Resurfacing
of
roadways
in
the
area
of
SW
216
ST
from
US‐1
to
SW
127
AV
located
in
the
Goulds
 Neighborhood
Revitaliza3on
Strategy
Area,
Commission
District
9 Public
Works
‐
roadway
resurfacing
NW
32
Ave
from
N.
River
Dr
to
NW
41
St

Miami‐Dade

FL

Streets/Roads

Public
Works‐
NW
74
St
Environmental

Miami‐Dade Miami‐Dade

FL FL

Streets/Roads Streets/Roads

Public
Works
‐
roadway
resurfacing
NW
87
St
and
NW
95
St
from
NW
27
Ave
to
NW
37
Ave Public
Works
‐
roadway
resurfacing
SW
184
St
and
SW
200
St
from
SW
107
Ave
to
SW
117
Ave

Miami‐Dade

FL

Streets/Roads

Public
Works
‐
roadway
resurfacing
NW
32
Ave
from
NW
41
St
to
NW
79
St

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Miami‐Dade














144,300


11














123,500
 












265,000
 












230,000
 












405,000
 












225,000
 












365,000
 












575,000
 












630,000


11 13 13 13 13 13 13 13














127,000


13














210,000


13














100,000


13














135,000


13














125,000


13














125,000


13














185,000


13
















35,000


13












1,000,000


15














165,000


20












1,050,000


25












4,692,851
 










1,125,000


25 27












2,520,000


30












1,300,000


31

Public
Works‐
Vene3an
Bridges
Rehabilita3on












7,000,000


32

Public
Works‐
Pavement
resurfacing,
storm
drainage
improvements,
curb
and
gufers
improvements,
and
 sidewalk
improvements
on
SW
180
Street
from
SW
147
Ave
to
SW
137
Ave Public
Works‐
Roadway
Improvements
to
NW
106
Street
and
NW
S.
River
Drive
Culvert












1,406,000


35














987,000


35

Roadway
improvements
including
concrete
median,
milling
and
resurfacing,
con3nuous
storm
drainage
 system,
curb
and
gufers,
and
sidewalk
replacement
on
SW
72
Avenue
from
SW
40
Street
to
SW
20
Street Roadway
widening,
resurfacing,
traffic
circles,
and
drainage
on
SW
142
Ave
from
Sw
42
Street
to
SW
26
Street












1,418,000


35












1,125,000


35














500,000


62

Streets/Roads

Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
on
SW
184
Street
from
SW
147
Ave
to
SW
137
 Ave. Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
on
W
76
Street
from
W
36
Ave
to
W
28
Ave.












7,508,000


62

FL

Streets/Roads

Construc3on
of
a
new
4
lane
roadway
and
other
infrastructure
W
76
Street
from
W
28
Ave
to
W
20
Ave.












6,169,548


62

Miami‐Dade

FL

Streets/Roads












9,821,000


89

Miami‐Dade

FL

Streets/Roads

Construc3on
of
a
new
4
lane
roadway
and
other
improvements
on
W
24
Avenue
from
W
52
Street
to
W
76
 Street. NW
138
Street
and
Bridge
(over
Miami
River
Canal):
Roadway
widening
and
bridge
replacement.












6,936,000


91

Miami‐Dade

FL

Streets/Roads

Roadway
widening
and
bridge
replacement
on
SW
160
Street
from
SW
147
Ave
to
SW
137
Ave.












6,833,000


91

Miami‐Dade

FL

Streets/Roads

Construc3on
of
a
new
4
lane
roadway
on
SW
157
Avenue
from
SW
136
Street
to
Sw
120
Street.












9,672,000


113

City

State

Program

Miami‐Dade

FL

Streets/Roads

Miami‐Dade

FL

Miami‐Dade

Project
Descrip3on

Funding
Required

Jobs










28,873,069


115

Streets/Roads

Construc3on
of
the
new
6
lane
roadway
between
NW
107
Ave
to
NW
87
Ave
and
expansion
to
5
lanes
from
87
 to
84
Avenue. Miami
Interna3onal
Airport
‐
widen
perimeter
road
through
NW
42
St
away
from
fuel
farm










24,000,000


130

FL

Streets/Roads

Public
Works
‐
Rebuild
Vene3an
Causeway
Bridges








110,000,000


150

Miami‐Dade

FL

Streets/Roads

Miami
Interna3onal
Airport
‐
widen
Central
Boulevard
and
service
loop
road










97,000,000


250

Miami‐Dade

FL

Streets/Roads








426,529,000


250

Miami‐Dade

FL

Streets/Roads

Miami‐Dade
Transit
‐
Orange
Line
Phase
1,
2.4
mile
fixed
guideway
connec3ng
exis3ng
line
to
Miami
 Intermodal
Center NW
25
Street
Viaduct
Phase
1










50,000,000


300

Miami‐Dade

FL

Streets/Roads

Miami‐Dade
Transit
‐
Orange
Line
Phase
2,
9.5
mile
North
Corridor
Segment
to
Broward
County
line






1,409,000,000


400

Miami‐Dade

FL

Streets/Roads






2,463,000,000


400

Miami‐Dade

FL

Streets/Roads

Miami‐Dade
Transit
‐
Orange
Line
Phase
3,
10.5
mile
East‐West
segment
connec3ng
Miami
Intermodal
Center
 to
west
Miami‐Dade
urban
centers Seaport
Tunnel
Project
from
connec3ng
interstate
system
to
Miami's
Seaport;
amount
is
County
share








400,000,000


450

Miami‐Dade

FL

Transit

Miami‐Dade

FL

Miami‐Dade Miami‐Dade












3,120,000


3

Transit

Transit
Facility
Improvements‐
Transit
physical
plant
renova3ons
and
upgrades
including
garages
and
 warehouse
facili3es Metrobus
Infrastructure
Replacement‐
Metrobus
refurbishment
and
safety
projects










18,434,000


31

FL

Transit

Metromover
Infrastructure
Replacement
‐
Metromover
refurbishment
projects










21,071,000


38

FL

Transit

Metrorail
Track
and
Guideway
Rehabilita3on
‐
Perform
rehabilita3on
of
exis3ng
fixed
guideway
system










34,300,000


40

Miami‐Dade

FL

Transit

Metrorail
Infrastructure
Replacement
‐
Metrorail
refurbishment
projects
exclusing
guideway
refurbishment










16,150,000


55

Miami‐Dade

FL

Water












1,389,960


4

Miami‐Dade

FL

Water

Water
and
Sewer
‐
South
Miami
Neighborhood
Revitaliza3on
Strategy
Area
remove
2"
water
main
and
replace
 with
8"
water
main Solid
Waste
Management
‐
North
Dade
Landfill
groundwater
remedia3on
project












1,500,000


5

Miami‐Dade

FL

Water

Solid
Waste
Management
‐
South
Dade
Landfill
groundwater
remedia3on
project












5,000,000


5

Miami‐Dade

FL

Water












1,853,280


6

Miami‐Dade

FL

Water

Water
and
Sewer
‐
Melrose
Neighborhood
Revitaliza3on
Strategy
Area
remove
4"
water
main
and
replace
with
 8"
water
main Water
and
Sewer
‐
cleaning
and
surveying
of
large
diameter
sewers












1,500,000


7

Miami‐Dade

FL

Water

Water
and
Sewer
‐
Improvement
to
water
main
along
SR
5/US
1
from
SW
228
St
to
SW
268
St












2,425,826


8

Miami‐Dade

FL

Water

Water
and
Sewer
‐
rehabilita3on
of
sanitary
sewers
by
the
sec3onal
lining
method.












1,000,000


8

Miami‐Dade

FL

Water












2,808,000


9

Miami‐Dade

FL

Water

Water
and
Sewer
‐
Goulds
Neighborhood
Revitaliza3on
Strategy
Area
replace
2"
and
4"
water
mains
with
8"
 water
main Water
and
Sewer
‐
Model
City
Neighborhood
remove
4"
water
main
and
replace
with
8"
water
main












3,088,800


10

Miami‐Dade

FL

Water












3,706,560


12

Miami‐Dade

FL

Water












4,600,000


17

Miami‐Dade

FL

Water












6,200,000


20

Miami‐Dade

FL

Water












7,394,400


24

Miami‐Dade

FL

Water














500,000


30

Miami‐Dade

FL

Water










17,500,000


30

Miami‐Dade

FL

Water

Water
and
Sewer
‐
Leisure
City
Neighborhood
Revitaliza3on
Strategy
Area
remove
2"
water
main
and
replace
 with
8"
water
main Water
and
Sewer
‐
Installa3on
of
200
groundwater
monitoring
wells
that
are
required
in
order
to
implement
 the
Pump
Sta3on
Op3miza3on
Program.

This
improvement
will
prevent
and/or
reduce
overflows
during
peak
 flow
events. Water
and
Sewer
‐
Miscellaneous
repairs
(electrical,
structural
&
mechanical)
at
wastewater
system
pump
 sta3ons. Water
and
Sewer
‐
Removal
and
Replacement
of
Sanitary
Sewer
Gravity
Mains.












6,500,000


48

Miami‐Dade

FL

Water

Water
and
Sewer
‐
construct
South
District
Water
Reclaim
Plant








267,000,000


75

Miami‐Dade

FL

Water

Water
and
Sewer
‐
water
and
wastewater
treatment
facili3es
and
rehabilita3on
of
infrastructure










25,848,012


358

Miami‐Dade

FL

Water

Water
and
wastewater
treatment
facility
improvements
and
rehabilita3on
of
aging
infrastructure.

Miramar Miramar North
Miami

FL FL FL

CDBG Public
Safety CDBG










25,848,012
 












200,000
 












500,000


358 10 6

















2,000


10

North
Miami

FL

CDBG












2,000,000


10

North
Miami

FL

CDBG












5,000,000


30

North
Miami

FL

Energy












2,000,000


2

North
Miami

FL

Energy












5,000,000


10

North
Miami

FL

Energy












5,000,000


10

North
Miami

FL

Public
Safety














584,390


0

North
Miami

FL

Public
Safety














190,632


2

North
Miami

FL

Public
Safety














266,560


2

North
Miami

FL

Public
Safety














470,782


2

North
Miami

FL

Public
Safety














140,000


2

North
Miami

FL

Public
Safety

Commercial
Rehab. Police
Officers Con3nue
improvements
to
swales
and
sidewalks
in
areas
where
swales
are
deteriorated
and
not
func3onal
to
 reduce
flooding
and
improve
the
overall
appearance
of
neighborhoods. Revive
the
Commercial
Facade
Program
to
provide
grants
to
exis3ng
businesses
to
assist
with
the
exterior
 facade
of
buildings
to
prevent
the
appearance
of
blight
and
stabilize
the
commercial
areas. Business
Incubator
program
to
help
new
busnesses
and
retain
exis3ng
businesses
by
providing
"start
up"
funds
 to
bring
them
to
the
City
or
providing
funds
to
retain
the
business. Establish
a
"Change
a
light
bulb"
program
for
all
income
eligible
households
and
change
out
all
Incandescent
 bulbs
to
compact
fluorescent
bulbs
to
reduce
energy
consump3on
City
wide. Install
solar
panels
and
wind
turbines
where
applicable
beginning
with
all
City
owned
facili3es
to
reduce
 energy
and
create
renewable
energy
produc3on. Retrofit
of
all
City
owned
facili3es
by
changing
out
light
fixtures,
replacing
switches
with
censor
controls
to
 increase
energy
efficiency. Strike
Team
‐
This
project
will

fund
the
Targe3ng
Violent
Crime
(Strike
Team)
ini3a3ve.
to
iden3fy
crime
trends
 and
paferns,
gang
members,
and
build
criminal
cases
against
iden3fiable
offenders.
Violent
crimes
targeted
 will
be
violent
Part
1
Crimes Public
Service
Aides
‐
This
project
will
fund
two
addi3onal
Public
Service
Aide
posi3ons.
These
Public
Service
 Aides
will
handle
non‐violent
report
calls
(pefy
thebs,
minor
accidents,
abandoned
vehicles,
etc.)
and
will
 provide
relief
to
Uniform
Patrol School
Resource
Officers
‐
This
project
will
allow
us
to
fund
two
full
3me
school
resource
officers
to
be
 deployed
to
work
in
and
around
middle
and
senior
high
schools.
 Solving
Cold
Cases
with
DNA
‐
This
project
will
allow
us
to
eliminate
the
backlog
of
approximately
35
cold
case
 homicides
and
approximately
300
cold
case
sex
crimes.
This
will
allow
us
to
use
newer
DNA
technologies
such
 as
Short
Tandem
Repeats
(STRj) Support

for
the
Communica3ons
and
Records
Management
System
‐
The
Police
Department

recently
 purchased
a
new
CAD
system.

These
funds
will
be
used
to
hire
two
informa3on
technology
specialists
to
 implement
and
support
on
an
on‐going
basis
the
PD's
CAD Community
Oriented
Police
Officers
‐
This
project
will
allow
us
to
fund
3
full
3me
community
oriented
police
 officers.














399,840


3

Water
and
Sewer
‐
West
Lifle
River
Neighborhood
Revitaliza3on
Strategy
Area
remove
4"
water
main
and
 replace
with
8"
water
main Water
and
Sewer
‐
One‐Year
Countywide
Contract
w/op3on
to
renew
for
the
Rehabilita3on
of
sanitary
Sewers
 by
the
Cured‐In‐Place
Lining
Method
(S‐838). Water
and
Sewer
‐
install
re‐use
pipe
to
distribute
reclaimed
water
to
industrial
users
in
South
Miami‐Dade

City

State

Program

North
Miami

FL

Public
Safety

North
Miami

FL

North
Miami North
Miami

Project
Descrip3on

Funding
Required

Jobs














666,400


5

Streets/Roads

Patrol
Officers
‐
This
project
will
fund
five
addi3onal
police
officers
to
augment
our
current
patrol
staffing.
 These
addi3onal
officers
will
specifically
be
used
in
areas
of

directed
patrol
and
proac3ve
crime
reduc3on
 opera3ons. Pedestrian
walk
way
and
handicap
ramp
repairs
and
construc3on
in
areas
that
are
without.












2,500,000


10

FL

Streets/Roads

Asphalt
overlaying
of
deteriora3ng
roads
throughtout
the
city.












5,000,000


12

FL

Streets/Roads












2,000,000


15

North
Miami

FL

Transit

North
Miami

FL

Transit

Replace
worn
out
walk
bridge
across
canal
which
carries
students
from
one
side
of
the
city
to
the
other
for
 school.
This
walk
bridge
also
has
a
few
water
and
sewer
lines
afached
that
would
require
work. Addi3onal
transit/hub
shelters
is
needed
to
service
the
exis3ng
and
expected
ridership
which
will
be
generated
 by
the
acquisi3on
of
the
7
new
buses. Land
will
be
needed
to
store
and
maintain
the
buses
when
purchased.

North
Miami

FL

Transit

North
Miami

FL

Water

To
expand
our
exis3ng
NOMI
Transit
Circulator
system
by
bringing
the
service
inhouse
and
acquiring
a
total
of
 seven
(7)
Azure
Hybrid
buses
which
will
reduce
carbon
emissions
by
30%. Purchase
addi3onal
property
for
expansion
of
water
treatment
facility
and
clear
the
property
for
construc3on.

North
Miami

FL

Water

Rehabilita3on
of
ten
(10)
exis3ng
sewer
lib
sta3ons
that
collect
from
gravity
sewers
in
residen3al
areas.

North
Miami

FL

Water

North
Miami

FL

North
Miami

FL

North
Miami
Beach

FL

North
Miami
Beach














250,000


1












1,200,000


1












1,500,000


10












1,600,000


6














600,000


7

Lining
of
exis3ng
sanitary
sewer
force
mains
of
various
size
pipes
to
stop
water
from
infiltra3ng
the
pipes.










10,000,000


10

Water

Installa3on
of
test
/
produc3on
well
for
new
R/O
Treatment
facility.












5,000,000


15

Water








120,000,000


200

Public
Safety

Upgrade
of
exis3ng
lime
sobening
water
treatment
plant
and
construc3on
of
a
new
reverse
osmosis
water
 treatment
facility
to
be
completed
by
year
2014
with
phases
through
2010. Police
Technology
Upgrades

FL

Public
Safety

North
Miami
Beach

FL

Streets/Roads

North
Miami
Beach

FL

Streets/Roads

North
Miami
Beach

FL

Streets/Roads

North
Miami
Beach

FL

Streets/Roads

North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach

FL FL FL FL FL FL FL

Transit Transit Transit Transit Water Water Water

North
Miami
Beach

FL

Water

North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach North
Miami
Beach Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Myrtle
Grove
Fireflow
improvements 3,750
l.f.
8"
&
12"
pipe
with
6
fire
hydrants Myrtle
Grove
Force
main
replacement.
3,500
l.f.
of
8"
&
12"
pipe NW
151
Street
system
beferment.

2,650
l.f.
8"
&
12"
water
main
with
4
fire
hydrants Installa3on
of
Security
Perimeter
Wall
of
Norwood
Water
Treatment
Plant Protec3on
of
Well
Field
‐
VOC
Removal
Phase
II Installa3on
of
Emergency
Generator
at
the
Norwood
Water
Treatment
Plant Automated
Water
Meter
Reading
Project Complete
NE
12
Avenue
street
ends
with
pavers,
trellises,
benches,
fountains Retrofit
City
Hall,
14,000
sf,
windows,
roof,
generator Complete
phase
II‐
downtown
park
with
plaza,
parking,
ligh3ng
and
walking
path Harlem
McBride
drainage,
street
and
park
improvements Renovate
and
retrofit
downtown
park
building
into
arts
center NE
34
Ct.,
NE
5th
Ave.
to
NE
38th
Street,
streetscape,
drainage Replace
Aging
Fire
Sta3on
#9 NE
38th
St.,
NE
11
Ave
‐
Andrews
Ave.

Drainage,
streetscape,
sidewalks Andrews
Ave.
streetscape,
ligh3ng,
landscape Prospect
Rd,
streetscape,
ligh3ng,
landscape NE
34
Ct.
Dixie
Hwy
to
Andrews
Ave.
,
sidewalks,
streetscape,
drainage Acquire
land
and
build
parking
garage
to
support
FEC
passenger
rail Replace
aging
Public
Works
facility Replace
aging
Collins
Center
with
40000
sf
mul3
purpose
center Replace
2
aging
Fire
Sta3ons Rehabilitate
NE
16th
Ave.
bridge Powerline
Rd
to
NE
10
Ave.
to
Prospect
Rd,
sidewalks,
landscaping,
streetscaping Resurface
28
miles
of
roadway NE
38
St.
,
NE
13th
Ave.
to
NE
11th
Ave.
realignment
of
intersec3on,
sidewalks,
streetscape

Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Oakland
Park Orlando Orlando Orlando Orlando Orlando Orlando

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Airport Airport Airport Airport Amtrak CDBG

Build
25
miles
of
sidewalk/trails NE
38th
St.,
Andrews
to
Powerline
Rd.,
streetscape,
landscaping,
sidewalks Wastewater
study Rock
Island
water,
sewer,
landscaping Garden
Acres
sewer,
street
improvements Lib
Sta3on
replacements Automated
water
meter
reading
project Sewer
Force
Main
Replacements Inflow
and
inflowtra3on
correc3on
project Waterline
replacements
for
50
yr
old
lines ORLANDO
EXECUTIVE
AIRPORT‐Airport
Drainage
&
Master
Plan
Updates ORLANDO
INTERNATIONAL
AIRPORT‐Upgrade
Airfield
Ligh3ng
Equipment ORLANDO
EXECUTIVE
AIRPORT‐Airfield
Improvement
Projects ORLANDO
INTERNATIONAL
AIRPORT‐Rehabilita3on
of
Taxiway
C‐Phase
2 Orlando
Amtrak/Commuter
Rail
Transfer
Sta3on
Renova3on‐1400
Sligh
Blvd‐Orlando,
FL
32806 Center
for
Drug
Free
Living














400,000


3

Police
Officer
Jobs














500,000


15

The
Greynolds
Park
Golf
Course
Perimeter
Bike
Path:
Between
NE
20‐22
Avenues
from
NE
174‐179
Streets,
 connec3ng
Government
Center
neighborhood
to
Greynolds
Park The
NE
183
Street
Bike
Path:
between
the
exis3ng

North
Glades
bike
path

and
ending
at
Greynolds
Park
















85,000


12














138,000


12














220,000


15














300,000
 












300,000
 












300,000
 












450,000
 












800,000
 












300,000
 












375,000


20 20 20 25 40 10 10














280,000


10














300,000
 












225,000
 












225,000
 












300,000
 












400,000
 












795,000
 








10,000,000
 












750,000
 










1,190,000
 










2,000,000
 










2,000,000
 










3,500,000
 










2,800,000
 










2,900,000
 










3,600,000
 










4,000,000
 










4,000,000
 










6,400,000
 










8,000,000
 










8,000,000
 








10,000,000
 










6,800,000
 












600,000
 










1,500,000
 










2,300,000


10 10 10 15 25 40 50 20 40 60 60 75 80 90 110 120 120 200 240 240 300 200 18 45 70












2,627,390
 










2,900,000
 










3,800,000
 












250,000
 










1,000,000
 










2,000,000
 










2,366,000
 










1,700,000
 










3,000,000
 










5,000,000
 








10,600,000
 












500,000
 










1,300,000
 










3,200,000
 








20,000,000
 










3,500,000
 














35,589


75 85 110 8 30 60 75 80 90 150 315 4 8 20 100 15 3

The
East
Drive
Bike
Path:
Connec3ng
The
Uleta
Neighborhood

through
Litman
Park

and
then
onto
the
exis3ng
 South
Glades
Drive
Bike
Path. New
Linear
Park
with
Bike
path
by
closing
Miami
Drive
between
NE
159‐163
Streets.
Will
connect

the
NE
13
 Avenue

and
15
Avenue
bike
paths. NE
161
Street
Roadway
Improvement NE
179
Street
Curbing
and
Street
Resurfacing Eastern
Shores
&
Allen
Park
Street
Resurfacing South
Glades
Drive
Roadway
Improvement Dade
North
Fireflow
improvements
Ph
1
&
2‐
3,600
l.f.
12"
W.M
w/
6
fire
hydrants Fire
Hydrant
installa3on
project
Ph1‐3
.
Approx
75
Fire
Hydrants
installed. Mitchell
Lake
Estates
system
Beferment.
3,450
l.f.
8"
water
main
replacement
with
4
fire
hydrants

City

State

Program

Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando

FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Orlando

FL

CDBG

Homeless
Assistance
Drop‐in
Center Andora
Street
Drainage
Improvements Bumby
Avenue
Resurfacing Englewood/Monterey
Underdrain
Construc3on Lake
Angel/Conroy
Basin
Drainage
Improvements Lake
Dot/Hughey
Avenue
Stormwater
Retrofit
Project Lake
Mann
Estates
Underdrain
Construc3on Mercy
Drive
Resurfacing/Underdrains New
Malibu
Underdrain
Construc3on Oakley
Street
Drainage
Improvements Orange
Blossom
Trail
Corridor
Drainage
Improvements Center
for
Mul3cultural
Wellness
&
Preven3on‐Renova3on/Site
Improvement
for
Youth
Academic
Enrichment
 Center Coali3on
for
the
Homeless‐Women
&
Children
Bathroom
Facili3es
Renova3on

Project
Descrip3on

Orlando

FL

CDBG

Orlando

FL

Orlando

Funding
Required 










2,000,000
 












350,000
 












985,500
 










1,100,000
 










1,000,000
 










1,800,000
 












669,200
 












185,500
 










1,100,000
 










1,000,000
 












850,000


Jobs

5 10 10 10 10 10 10 10 10 10 10














245,500


12














274,197


12

Quest,
Inc.‐South
Voca3onal
Facility
Rehabilita3on














124,898


12

CDBG

Z.L.
Riley
Park














200,000


20

FL

CDBG












1,100,000


25

Orlando

FL

CDBG

North
Parramore
Site
Development‐Infrastructure/site
improvements
for
housing
development
in
the
 Parramore
neighborhood Recrea3on
Facility
Improvements‐Loca3ons
throughout
the
City












3,800,000


60

Orlando

FL

CDBG

Orlando

FL

CDBG

Orlando

FL

CDBG

Orlando

FL

Energy

Orlando

FL

Energy

Orlando Orlando Orlando Orlando Orlando Orlando Orlando

FL FL FL FL FL FL FL

Housing Housing Housing Housing Housing Housing Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Public
Safety

Orlando

FL

Schools

Orlando

FL

Schools

Mission
Road
Part
1
The
ini3al
segment
of
the
4‐lane
divided
arterial,
Mission
Road,
will
provide
cri3cal
surface
 street
access
between
mul3‐family
housing
areas,
and
industrial/retail
employment
opportuni3es.

 600
Kilowaf
roobop
solar
array
system
downtown‐to
increase
renewable
energy
produc3on
in
Central
Florida
 and
support
the
growing
solar
industry
in
Florida Illuminated
Street
Name
Signs
Upgrade
Project
‐This
project
will
provide
an
energy
savings
and
improve
 naviga3on
throughout
the
City
by
replacing
incandescent
illuminated
street
name
signs
at
traffic
signals
with
 energy
efficient
LED
street
name
signs. Griffin
Park
‐Playground
Equipment Ivey
Lane
Dumpster
Enclosures,
Approach
and
Landscaping Murchison
Terrace
Dumpster
Enclosures,
Approach
and
Landscaping Griffin
Park
‐Demoli3on
of
Building
812 Reeves
Terrace‐Security
Fencing
&
Signage Citrus
Square‐Security
Ligh3ng Digital
cameras
have
become
the
standard
for
photographing
crime
scenes,
accidents,
suspects,
etc.
Current
 budget
constraints
have
hampered
the
purchase
of
new
&
replacement
s3ll
&
video
equipment
in
the
Orlando
 Police
Department. Orlando
Police
Department's
Drug
Enforcement
Division
is
currently
u3lizing
out‐dated
covert
audio
and
video
 equipment.
The
equipment
is
approximately
5
to
10
years
old.
The
division
is
also
in
need
of
night
vision
op3cs
 to
assist
in
surveillance
during Police
In‐Car
video
cameras
for
all
patrol
vehicles.

This
will
enhance
officer
safety
and
capture
evidence
from
 traffic
stops
and
vehicle
pursuits.

 Protec3ve
vests
save
lives.
The
Orlando
Police
Department
u3lizes
different
types
of
vests
for
patrol
units,
 criminal
inves3ga3ve
units
&
SWAT
units
all
of
which
have
manufacturers'
life
expectancies. Taser
technology
has
improved
over
the
years.
The
Orlando
Police
Department's
officers
currently
use
Taser
 Model
M26
which
is
2003
technology.
Budget
constraints
currently
prevent
the
replacement
of
20%
of
the
 department's
M26s
with
today's
model
X26. The
Orlando
Police
Department’s
Crime
Scene
Inves3ga3ons
Unit
has
iden3fied
new
technology
for
 inves3ga3ng
crime
scenes:
a
laser
measuring
system
for
more
precise
measurements
which
is
crucial
during
 court
proceedings
&
a
digital
recording
system,
Cr The
Orlando
Police
Department's
Forensic
Imaging
equipment
has
outlived
its
life
expectancy
&
should
any
of
 the
components
fail,
our
department's
photographic
capability
regarding
latent
prints
will
be
severely
 hampered.
Current
budget
constraints
hinder The
Orlando
Police
Department's
two
specialized
units,
Motors
&
Mounted
(Motorcycles
&
Horses)
are
vital
 units
to
figh3ng
crime
in
the
City
of
Orlando.
These
units
both
u3lize
equipment
that
has
recommended
 manufacture's
life
expectancy.
 Up‐to‐date
protec3ve
equipment
is
needed
to
allow
the
Orlando
Police
Department's
training
unit
to
increase
 the
realism
of
exercises
while
protec3ng
our
officers
&
dogs.
Current
budget
constraints
have
hampered
the
 purchase
of
this
equipment. The
Orlando
Police
Department
is
implemen3ng
a
new
crime
figh3ng
and
preven3on
tool,
IRIS
(Innova3ve
 Response
to
Improve
Technology).
This
project
uses
camera
technology
to
prevent,
detect,
and
respond
to
 crime
throughout
the
City
of
Orlando.
 The
Orlando
Police
Department
has
employed
various
methods
&
tac3cs
in
an
effort
to
reduce
violent
crime.
 The
addi3on
of
two
sworn‐officers
in
our
busiest
areas
would
allow
patrol
units
to
increase
the
number
of
self‐ ini3ated
ac3ons
 Audubon
Park
Relie‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Blankner
K‐8
Schoo‐Consolidate
Fire
Alarm
System
(Gym
and
Main
Building)
to
ehance
safety
and
security.

Orlando

FL

Schools

Carver
Facility
Accessibility
(ADA)
campus
modifica3ons

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Eagle's
Nest
Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Eccelston
ES
ES
Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Engelwood
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school.

Homeless
Men’s
Service
Center‐The
facility
would
provide
24/7
case
management,
suppor3ve
services
 (including
job
training,
mental
health
and
substance
abuse
counseling)
and
beds
for
250
homeless
men.

It
will
 be
a
two
story
28,000
sq.
b.
facility
with
a
covered
roobop
gathering
area.

The
project
will
incoroprate
"green"
 builidng
principles. Park
Improvements‐throughout
the
City












6,700,000


70












7,725,000


145












6,300,000


234












3,700,000


53












2,018,000
 














90,000
 












122,000
 














61,000
 














50,000
 












500,000
 














75,000


75 2 2 2 5 8 10
















65,000















285,000
 










3,238,404
 












150,000















135,000















316,500















115,000















128,000

















37,000















500,000


1














250,000


2
















84,000


5
















40,000


5
















20,000


5
















75,000


5
















52,000


5
















65,000


5

City

State

Program

Project
Descrip3on

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Grand
Avenue
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Hillcrest
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
children
 while
travelling
to
and
from
school. Howard
MS‐Facility
Accessibility
(ADA)
campus
modifica3ons,
repave
drives,
parking
lot
and
sidewalks
to
 enhance
safety,
security
and
accessiblity. Ivey
Lane
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Lake
Como
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Lake
Silver
ES‐Replace
aging
sewerage
lib
sta3on,

repave
drives
and
parking
areas,
and
perform
upgrades
to
 HVAC
in
selected
buildings
to
enhance
campus
safety,
security,
and
efficiency.

Replace
DX
units
(12
small) Lake
Silver
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Odyssey
MS‐Computer
Server
Room
HVAC
and
Electrical
Upgrade
to
upgrade
the
school
compu3ng
 environment. Richmond
Heights
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
 of
children
while
travelling
to
and
from
school. Rock
Lake
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
of
 children
while
travelling
to
and
from
school. Washington
Shores
ES‐Sidewalk
infrastructure
improvements
in
the
surrounding
community
to
enhance
safety
 of
children
while
travelling
to
and
from
school. Catalina
ES
(old)‐Parking
and
sidewalk
improvements,
restroom
upgrades
to
ADA
standards,
HVAC
upgrades
 and
site
improvements
to
facilitate
con3nued
District
use
of
this
obsolete
facility. Cherokee
School
ES‐Replace
aging
sewerage
lib
sta3on,

repave
parking
areas,
and
upgrade
HVAC
system
to
 enhance
safety,
security,
and
efficiency. Dover
Shores
ES‐Re‐pave
drives,
parking
areas,
and
sidewalks
to
enhance
campus
safety.

Orlando

FL

Schools

Orlando

FL

Orlando

FL

Orlando

Funding
Required

Jobs
















65,000


5
















25,000


5














105,000


5
















65,000


5
















52,000


5














210,000


5
















35,000


5
















45,000


5
















54,000


5
















65,000


5
















45,000


5














120,000


8














275,000


8
















32,000


8

Audubon
Park
(old)
ES‐Replace
and
upgrade
exis3ng
aged
and
failing
sewerage
lib
sta3on.
















75,000


10

Schools

Howard
MS‐Replace
and
upgrade
exis3ng
aged
and
failing
sewerage
lib
sta3on.
















75,000


10

Schools

Boone
HS‐Re‐pave
drives,
parking
areas,
and
sidewalks
to
enhance
campus
safety.
















65,000


12

FL

Schools

Eccelston
ES‐Replace
the
roof
on
Building
#12














200,000


12

Orlando

FL

Schools














501,000


12

Orlando

FL

Schools












2,000,000


12

Orlando

FL

Schools












1,800,000


12

Orlando

FL

Schools














250,000


12

Orlando

FL

Schools














350,000


14

Orlando

FL

Schools

Engelwood
ES‐Replace
obsolete
technology
spine
to
allow
installa3on
of
computers
in
classrooms
to
facilitate
 an
enhanced
learning
environment.. Jones
HS‐Kitchen
equipment
and
addi3onal
Freezer,
Cooler,
and
Dry
Storage
Space
to
support
the
Central
 Kitchen
Concept
which
will
enhance
overall
food
service
quality
and
efficiency. Magic
Way‐Driveway
and
Parking
Lot
Pavement
and
Sidewalk
enhancement
to
promote
safety
at
this
OCPS
 Facili3es
Services
loca3on. Stonewall
Jackson
MS‐Perform
repairs
to
roofs
approaching
end
of
an3cipated
life
to
ensure
a
quality
learning
 environment
for
the
students
and
staff
and
prolong
the
life
of
the
facility. Northlake
Park
ES‐Security
Enhancements
to
facilitate
compliance
with
Jessica
Lundsford
Act
in
this
school
 which
is
co‐located
with
the
YMCA. Azalea
Park
ES‐Replace
exis3ng
offsite
water
main
with
larger
line
to
achieve
required
fire
flow.














500,000


15

Orlando

FL

Schools












1,040,000


15

Orlando

FL

Schools










18,000,000


15

Orlando

FL

Schools












1,040,000


15

Orlando

FL

Schools












1,650,000


15

Orlando

FL

Schools












1,100,000


15

Orlando

FL

Schools












2,500,000


16

Orlando

FL

Schools












3,750,000


18

Orlando

FL

Schools












2,300,000


20

Orlando

FL

Schools












6,520,000


30

Orlando

FL

Schools












3,800,000


30

Orlando

FL

Schools
















36,050


32

Orlando

FL

Schools












2,350,000


36

Orlando

FL

Schools












3,951,360


40

Orlando

FL

Schools












4,800,000


115

Orlando

FL

Schools












7,000,000


150

Orlando

FL

Schools










28,000,000


200

Citywide‐All‐Classroom
Technology
Installa3on/Upgrade
to
ensure
the
classroom
learning
environment
at
all
 exis3ng
schools
within
Orlando
meet
district
standards
in
terms
of
audio
enhancement,
video
projec3on
and
 whiteboards
to
equitably
meet
the
educat Citywide‐All‐Network
infrastructure
enhancements
to
upgrade
all
exis3ng
schools
within
Orlando
to
current
 standards
to
meet
the
educa3onal
needs
of
all
students,
faculty
and
administrators. Citywide‐All‐Server
Virtualiza3on
to
upgrade
the
school
compu3ng
environment
at
all
exis3ng
schools
within
 Orlando
to
current
standards
to
meet
the
educa3onal
needs
of
all
students,
faculty
and
administrators. Citywide‐All‐Site
Security
Fencing
Enhancement
Program
to
ensure
compliance
with
Jessica
Lunsford
Act
 requirement
that
all
campuses
be
secure
from
intrusion. Edgewater
HS‐Sidewalk
infrastructure
improvements
along
Maurey
Rd
to
enhance
safety
of
students
while
 travelling
to
and
from
school. Citywide‐All‐School
Bicycle/Pedestrian
enhancements
to
facilitate
the
convenient
use
of
alterna3ves
to
internal
 combus3on
engine
powered
modes
of
transporta3on
to
move
students
to
and
from
the
schools.

This
would
 include
sidewalk/biketrail
improvement Jones
HS/Howard
MS/McCoy
ES‐All‐Site
Ligh3ng
LED
Ligh3ng
Test
Program
to
replace
exis3ng
incandesant
 ligh3ng
with
new
high
efficiency
LED
ligh3ng. Odyssey
MS
Relief
MS‐Construct
Narcoossee
Roadway
and
Sidewalk
improvements
to
facilitate
safe
and
 efficient
movement
of
students
into
this
new
school
site. Citywide‐All‐Classroom
Computer
Installa3on/Upgrade
to
ensure
the
classroom
compu3ng
environment
at
all
 exis3ng
schools
within
Orlando
meet
district
standards
in
terms
of
computer
availability
and
up‐to‐date
 sobware
to
meet
the
educa3onal
needs
 Jones
HS‐New
school
Stadium
(Football/Track)
at
the
exis3ng
prac3ce
field
facility
with
new
Bleachers,
Fieled
 House,
Restrooms,
and
Concessions
Stands
to
allow
all
School
athle3c
ac3vi3es
to
occur
on‐campus
rather
 than
in
the
Citrus
Bowel. Audubon
Park
(old)
ES‐Parking
and
sidewalk
improvements,
restroom
upgrades
to
ADA
standards,
and
HVAC
 upgrades
to
facilitate
con3nued
District
use
of
this
obsolete
facility. Dr.
Phillips
HS‐Replace
Chilled
Water
Lines
throughout
the
campus.

Replace
Air
Handler
Units
and
controls.

 Replace
Chillers
#2
&
#3.

Replace
Cooling
Tower. Rosemont
ES
Comprehensive‐Add
Outside
Air
to
Classroom
HVAC
Systems,
Replace
Kitchen
Grease
Traps
and
 Fans,
Upgrade
Classroom
Technology,
Repair
Roofing Rosemont
ES‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on
 to
enhance
student
learning
environment
and
eliminate
portable
classrooms. Boone
HS‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on Dr.
Phillips
9th‐Portable
Replacement
project
to
replace
old
portable
classrooms
with

permanent
construc3on
 to
enhance
the
learning
environment,
safety,
and
security.

City

State

Program

Orlando

FL

Schools

Nap
Ford
Community
School‐
construc3on
of
permanent
building

Project
Descrip3on

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Schools

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Streets/Roads

Orlando

FL

Transit

Shingle
Creek
ES‐Replacement
of
modular
classrooms
with
permanent
classrooms
which
may
include
New
 Classroom
Buildings
,
Administra3ve
Addi3on,
Remodel
Cafeteria,
Media
Center,
Upgrade
Classrooms,
Replace
 HVAC
System,
Replace
Fire
alarm
System Orange
Center
ES‐Administra3ve
Addi3on,
Remodel
Classroom
Building,
Remodel
Media
Center
and
Cafeteria,
 Build
a
new
Central
energy
Plant. Azalea
Park
ES
Replacement‐Comprehensive
school
renova3on
to
meet
current
educa3onal
adequacy,
and
 enhance
security,
technology,
and
efficiency. Odyssey
MS‐Construct
a
Relief
School
for
the
overcrowded
Odyssey
MS
to
enhance
the
student
learning
 environment
and
eliminate
portable
classrooms. Edgewater
HS‐Comprehensive
school
renova3on
to
meet
current
educa3onal
adequacy,
and
enhance
security,
 technology,
and
efficiency. Shingle
Creek
Trail‐Cri3cal
1000
foot
segment
of
a
paved
mul3‐use
trail
that
is
part
of
overall
regional
trail
 network
providing
access
to
mul3ple
schools
and
employment
areas. Regional
Transit
Center
Parking
Lot
Located
adjacent
to
LYNX
Central
Sta3on
and
due
to
its
ideal
loca3on,
will
 provide
a
significant
benefit
to
LYNX
employees,
guests,
visitors,
etc.,
and
will
ul3mately
be
a
hub
for
future
rail
 expansion,
Commuter
Rail Raleigh
Street
Conges3on
Management
‐
The
roadway
on
the
west
side
of
the
City
of
Orlando
con3nues
to
 experience
conges3on
and
safety
problems
as
it
accommodates
over
16,000
Daily
Trips
on
a
two‐lane
roadway
 that
lacks
leb
turn
lanes.
 SR
50
/Downtown
Orlando
‐
Conges3on
Management
Improvements
‐
The
improvements
will
op3mize
traffic
 flow
and
reduce
cut‐through
traffic
in
Downtown
Core
Neighborhoods.

The
project
consists
of
addi3onal
turn
 lanes
approaching
SR
50
(Colonial
Dr)
at
the Neighborhood
Sidewalk
Ini3a3ve
‐The
Surface
Transporta3on
Policy
Project
ranked
Metro
Orlando
as
having
 the
"Meanest
Streets"
in
2004.

The
City
has
been
trying
to
improve
the
safety
of
pedestrians
with
Sidewalk
 Projects
in
the
Urban
Core
 Medical
City
and
VA
Hospital
Traffic
Signal/ITS
Interconnect
‐
The
Medical
City
Part
of
Orlando
is
the
future
 home
of
Central
Florida,
VA
Hospital
and
the
UCF
Medical
School.

The
installa3on
of
fiber
op3c
 communica3ons
along
key
corridors Pine
Street
Extension
The
extension
of
a
2‐lane
downtown
street
and
the
two‐waying
of
an
adjacent
Pine
 Street
segment
are
necessary
for
adequate
traffic
circula3on
in
Downtown
Orlando.

Collector
level
traffic
 circula3on
has
been
impacted
 LYNX
Central
Commuter
Rail
Sta3on
‐
Located
north
of
Livingston
St.
in
Downtown
Orlando
adjacent
to
the
 Downtown
Bus
Terminal
providing
quick
and
easy
mode
change
to
the
regional
bus
network.
Sta3on
 enhancements
include
10
b.
walkways
 Audubon
Park
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and
 build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
 underground
u3li3es.
 Amtrak/ORMC
Commuter
Rail
Sta3on
‐
Located
just
south
of
Downtown
Orlando,
provides
quick
and
easy
 mode
change
to
Amtrak,
the
region's
exis3ng
train
service,
and
provides
service
to
another
leading
employer,
 Orlando
Regional
Medical
Center Church
Street
Commuter
Rail
Sta3on‐Located
in
the
heart
of
Downtown
Orlando,
adjacent
to
the
exis3ng
 Downtown
landmark
Church
Street
Sta3on,
providing
service
to
the
core
of
the
Downtown
business
area,
all
 major
government
buildings,
senior
high‐rise
housing Florida
Hospital
Commuter
Rail
Sta3on
‐
Located
just
north
of
Downtown
Orlando
within
walking
distance
of
 Lake
Ivanhoe
and
Loch
Haven
Park
and
will
serve
one
of
the
largest
employers
in
Central
Florida,
Florida
 Hospital. Boone
Avenue
Extension‐While
the
recently
completed
I‐4/SR
408
Interim
Interchange
project
has
improved
 limited
access
interstate
mobility,
it
has
resulted
in
less
collector
network
mobility
for
Downtown
Orlando. Ivanhoe
Village
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and
 build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
 underground
u3li3es.
 Edgewater
Drive
Main
Street
District
Streetscape‐Transporta3on
Enhancement
project
including
design
and
 build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
 underground
u3li3es. Downtown
South
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and
 build
out
of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
 underground
u3li3es.
 Downtown
Orlando
ITS
Network‐This
project
consists
of
the
expansion
of
the
Intelligent
Transporta3on
System
 throughout
Downtown
Orlando.
The
ITS
technology
uses
new
technology
to
provide
conges3on
management
 and
incident
management
capability.
 Mills
50
Main
Street
District
Streetscape‐
Transporta3on
Enhancement
project
including
design
and
build
out
 of
gateways,
sidewalks,
drainage,
traffic‐calming,
ligh3ng,
signage,
landscaping,
irriga3on,
and
underground
 u3li3es.
 Mission
Road
Part
2
This
cri3cal
0.7
mile
segment
of
the
4‐lane
divided
minor
arterial,
Mission
Road
Project
 includes
the
0.4
mile
comple3on
of
Metrowest
Boulevard.

The
roadway
will
serve
as
an
alternate
north/south
 route
 Bus
Rapid
Transit
System
–
Bus
Replacement:
The
exis3ng
Downtown
Bus
Rapid
Transit
circulator
connects
the
 Downtown
Central
Business
District
Core,
City
Hall,
Amway
Arena,
and
the
Orange
County
Courthouse
to
LYNX
 Central
Sta3on,
which
will
also
serve
as
a
future
Commuter
Rail
Sta3on.

The
route
has
been
a
major
success,
 with
ridership
levels
consistently
reaching
4,500
per
day,
100,000
per
year
over
the
last
decade.
The
exis3ng
 buses
have
reached
their
mileage
limits
and
need
to
be
replaced
to
con3nue
providing
the
outstanding
 services
to
the
residents,
visitors,
and
employees
within
Downtown
Orlando.
Ten
(10)
buses
are
required
to
be
 replaced
and
4
(four)
new
buses
will
be
added
to
the
fleet
to
improve
headways.

Orlando Orlando Orlando Orlando

FL FL FL FL

Water Water Water Water

Clear
Lake
Area
‐Lib
Sta3on
57
Rehabilita3on Englewood
Park
Area‐
Lib
Sta3on
16
Rehabilita3on Holden
Heights
Area‐Lib
Sta3on
18
Rehabilita3on Lake
Breeze
Drive
Sanitary
Sewers

Funding
Required Jobs 








25,378,000
 300










23,580,821


300










12,134,438


310










19,724,896


325










40,136,583


500










84,318,523


750














110,000


4














425,000


15














475,000


18














475,000


18














970,000


36












1,095,000


41












1,200,000


45












1,500,000


56












5,500,000


59












2,000,000


74












2,700,000


100












2,800,000


104












3,020,000


112










12,000,000


128










16,500,000


176










23,000,000


246












6,770,000


252










33,000,000


353










11,503,000


428












7,000,000
 












100,000
 












100,000
 












100,000
 










1,200,000


260 10 10 10 10

City

State

Program

Orlando Orlando Orlando

FL FL FL

Water Water Water

Project
Descrip3on

Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando Orlando

FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water Water Water Water Water Water Water Water

Orlando Orlando Orlando Orlando Palm
Bay Palm
Bay Palm
Bay

FL FL FL FL FL FL FL

Water Water Water Water Public
Safety Public
Safety Public
Safety

Palm
Bay

FL

Public
Safety

Palm
Bay Palm
Bay Palm
Bay

FL FL FL

Streets/Roads Streets/Roads Streets/Roads

Palm
Bay

FL

Water

Water
Pipeline
Replacement‐SR
50‐
Good
Homes
Road
to
Pine
Hills
Road West
Colonial
Area‐Lib
Sta3on
35
Rehabilita3on Lake
Eola
Upgrade Parramore
Heritage
Park
Water
Reten3on A
school
resource
office
is
needed
for
the
new
high
school,
opening
in
August
2008 Staff
is
needed
to
fully
operate
the
Automated
Fingerprint
Iden3fica3on
System. With
over
100,000
square
miles
and
100,000
popula3on,
the
City
needs
a
fully
equipped,
high‐tech,
mobile
 command
center
to
respond
to
natural
(hurricanes,
tornadoes,
wildfires)
and
other
large‐scale
emergencies. Palm
Bay
has
developed
and
implemented
a
Local
DNA
Indexing
System
(LODIS)
that
has
been
highly
successful
 in
solving
local
and
regional
crimes.
Funding
is
needed
for
con3nued
implementa3on,
evalua3on
and
 enhancement
of
the
program. Sidewalk
program
‐
19
sidewalk
projects
primarily
serving
school
areas US
1
streetscaping,
ligh3ng,
signaliza3on Road
reconstruc3on
of
approximately
137
miles
of
failed
residen3al
streets,
17
miles
of
failing
collectors
and
 resurfacing
of
547
miles
of
deteriora3ng
residen3al
streets
and
66
miles
of
deteriora3ng
collectors Water
distribu3on
system
in
Port
Malabar
Units
12,
16
and
22
to
serve
approximately
5350
residen3al
units.

Pembroke
Pines

FL

CDBG

Construc3on
of
a
restroom
facility
and
sidewalks
at
Walter
C.
Young
Resource
Center
Athle3c
Complex

Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines

FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG

Sports
ligh3ng
&
field
renova3on
at
Silver
Palms
Elementary
School Construc3on
of
a
central
storage
facility Construc3on
of
a
special
popula3ons
center Pines
Recrea3on
Teen
Center
Building Construc3on
of
soccer
fields
with
sports
ligh3ng
at
West
Pines
Soccer
Park
&
Nature
Preserve

Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines

FL FL FL FL FL FL

CDBG CDBG CDBG CDBG CDBG CDBG

Pembroke
Pines

FL

CDBG

Amphitheater
(3,000
seats) Miscellaneous
improvements
to
32
parks Parks Civic
Center New
City
Hall Installa3on
of
south
of
Pines
Boulevard,
north
of
Pembroke
Road,
west
of
the
Florida

gravity
sewer
lines
and
 lib
sta3ons
in
the
por3on
of
the
city
Turnpike
and
east
of
SW
72
Avenue New
Public
Services
Facility

Pembroke
Pines

FL

Energy

Pembroke
Pines

FL

Energy

Pembroke
Pines

FL

Energy

Pembroke
Pines

FL

Housing

Pembroke
Pines

FL

Housing

Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools

Lake
Dot/Hughey
Avenue
Retrofit‐ Lake
Monterey
Area‐Lib
Sta3on
27
Reloca3on Lake
Sunset
Area‐Lib
Sta3on
54
Rehabilita3on
Convert
type
lib
sta3on
to
submersible
pump
type
lib
sta3on
to
 address
age,
maintenance
and
safety
concerns. Malibu
Groves
Area‐Lib
Sta3on
60
Rehabiliata3on Oakley
St./Pine
Bluff
Drainage
Improvements‐ Richmond
Heights
Area‐Lib
Sta3on
65
Rehabilita3on Rio
Grande
Park
Area‐Lib
Sta3on
28
Rehabilita3on Silver
Star
Area‐Lib
Sta3on
41
Rehabilita3on Silver
Star
Road
FM
Project Solandra
Drive
Area‐Sanitary
Sewer‐ Water
Pipeline
Replacement‐Lake
Holden
Terrace/Albert
Shores Water
Pipeline
Replacement‐Narcoossee
Road
Widening‐Boggy
Creek
Road
to
SR
417 Water
Pipeline
Replacement‐Robinson
Avenue
from
Primrose
Drive
to
Mills
Avenue Water
Pipeline
Replacement‐SR
482
Sand
Lake
Road
from
Presidents
Drive
to
S.
Orange
Blossom
Trail

Add
thermal
storage
units
to
the
air
cooled
15‐ton
DX
units
to
reduce
energy
consump3on
at
peak
periods
to
 the
5
Senior
Residences
buildings
2‐15
ton
units/building Tie
Water
heaters
to
AC
heat
exchange
for
more
efficient
opera3on
of
both
AC
&
water
heat
exchange
unit.
Pre
 heats
reduces
costs
and
extends
equipment
life
for
880
units
@
$1200.00
per
unit Upgrade
the
3500
street
lights
owned
by
the
city
to
high
efficiency
ligh3ng.
Each
light
costs
$100.00
to
upgrade Tie
water
heaters
to
AC
heat
exchange
to
preheat
hot
water
for
more
efficient
opera3on
of
both
AC
and
water
 heater
reducing
costs
and
increasing
equipment
life,
880
units/1,200
per
unit. Install
thermal
storage
units
to
air
cooled
15
ton
DX
units
to
reduce
energy
consump3on
at
peak
demand
 3mes,
and
u3lize
off
peak
cooling
for
Senior
Residences,
5
buildings/10
units Automo3ve
License
Plate
Scanners Camera
System
for
Public
Safety
Facili3es Equipment
and
Vehicles
for
Personnel Lenco
Bearcat
Armor
Vehicles Main
Public
Safety
Facility
Generator OSSI
Records
Management
System P25
Compliant
Radios Patrol
Rifles Pocket
Cita3on
Devices Upgrades
Ballis3c
Protec3on
Vests Violent
Street
Crime
Task
Force Crime
Suppression
Patrol
Staffing Mobile
Computer
Labs Other
Charter
School
Technology
Needs
‐
Projectors
(204) Other
Charter
School
Technology
Needs
‐
Smartboards
(284) Replacement
of
Charter
School
Computers
(25%) VILLAGE
PRE‐K
50
LIGHT
SENSORS FSU
CAMPUS
105
LIGHT
SENSORS CENTRAL
CAMPUS
220
LIGHT
SENSORS EAST
CAMPUS
200
LIGHT
SENSORS ACADEMIC
VILLAGE
375
LIGHT
SENSORS WEST
CAMPUS
390
LIGHT
SENSORS

Funding
Required 










1,800,000
 












750,000


Jobs 10 10














100,000
 












100,000
 










1,000,000
 












100,000
 












100,000
 












100,000
 










1,300,000
 












750,000
 












885,000
 












640,500
 










1,400,000


10 10 10 10 10 10 10 10 10 10 10












2,524,192
 












432,947
 












100,000
 










1,000,000
 










3,000,000
 














75,000
 














50,000


10 10 10 15 25 1 1














875,000


2














350,000
 










2,000,000
 










5,400,000


4 60 150










70,000,000


1950










13,300,000


370














175,000
 












450,000
 










1,800,000
 










1,000,000
 










1,000,000


15 18 25 30 30












2,000,000
 










5,000,000
 










2,000,000
 










3,000,000
 








10,000,000
 








14,500,000


40 50 50 50 75 75










30,000,000


100










15,000,000


150












1,000,000


8












1,056,000


10














350,000


10












1,056,000


2












1,000,000
 












206,000
 












130,000
 












600,000
 












245,000
 












500,000
 










1,500,000
 










1,000,000
 












393,000
 












600,000
 












393,000
 












800,824
 










1,201,236
 












240,000
 












408,000
 












710,000
 












500,000
 















9,000
 














20,000
 














41,000
 














38,000
 














70,000
 














72,000


3

8 12 0 0 0 0 1 2 3 3 4 4

City

State

Program

Pembroke
Pines

FL

Schools

Thermal
Energy
Storage
to
improve
efficiency
of
water
cooled
chiller
and
save
energy
at
Academic
Village;

Project
Descrip3on

Pembroke
Pines

FL

Schools

Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit

Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines Pembroke
Pines

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Pinecrest Pinecrest Pinecrest Pinecrest Pinellas
Park Pinellas
Park Pinellas
Park Pinellas
Park Pinellas
Park

FL FL FL FL FL FL FL FL FL

Streets/Roads Water Water Water CDBG CDBG CDBG CDBG CDBG

Pinellas
Park Pinellas
Park Pinellas
Park

FL FL FL

CDBG Energy Public
Safety

Pinellas
Park Pinellas
Park

FL FL

Streets/Roads Streets/Roads

Pinellas
Park

FL

Streets/Roads

New
water
cooled
chiller
&
Thermal
Energy
Storage
units
to
cool
350,000
sq.
b.
and
save
energy
at
Howard
C.
 Forman
Campus Cinnamon
Place
I,
II,
III
&
IV
milling
&
resurfacing Mill‐Resurface
Pasadena
98
Ave‐Palm
Avenue‐Pines
to
Johnson
St Mill‐Resurface
Lakeside
Key
–
94
Ave‐Palm
Avenue
–
Pines
to
Pembroke Mill‐Resurface
Rainbow
Lakes
I
&
II
–
93
Ave
–
Tab
Street Mill‐Resurface
Tanglewood
–
95
Ave‐Palm
Avenue
–
Pines
to
Pembroke Mill‐Resurface
University
Heights
–
91
Ave‐Tab
Street NW
103
AVENUE
‐
3
street
to
Johnson
St
‐
reconstruc3on SOUTH
BRIDGE
‐
All
public
roads
‐
Repaving CHAPEL
TRAIL
‐
Phases
1,
2,
3
&
4
‐
repaving NW
12
ST
‐
155
Ave
to
Dykes
Road
‐
Reconst NW
155
AVENUE
‐
Pines
to
NW
12
St
‐
Reconst NW
178
AVE/NW
17
ST
‐
Pines
to
184
‐
reconstruc3on SW
178
AVENUE
‐
Pembroke
to
Pines
‐
reconstruc3on WASHINGTON
STREET
‐
Palm
Av
to
Hiatus
Rd
‐
Reconst Washington
Street
‐
SW
114
Av
to
Flamingo
Rd
‐
Reconstruc3on 196
AVENUE
‐
Pines
to
Tab
‐
Reconst 209
AVENUE
‐
Tab
Street
to
Johnson
US
27
‐
Reconst Hiatus
Road
–
Johnson
Street
to
Sheridan
Street
–
Milling
&
Resurfacing JOHNSON
STREET
‐
196
Ave
to
US
27
‐
Reconst JOHNSON
STREET
‐
NW
76
Avenue
to
Hiatus
Road
‐
Reconst TAFT
STREET
‐
Palm
Ave
to
Flamingo
Road
‐
Reconst SW
72
AVENUE
‐
Pembroke
to
Pines
‐
reconstruc3on TAFT
ST‐186
AVE
‐
Pines
to
196
Avenue PALM
AVENUE
‐
Pines
to
Pembroke,
Johnson
to
Sheridan
‐
Reconst 196
AVENUE
‐
Pembroke
to
Pines
‐
New
Road PEMBROKE
ROAD
‐
186
Avenue
to
202
Avenue
‐
New
road Replacement
of
City
Transporta3on
Fleet
Buses
(6) Provide
a
transporta3on
system
for
City
residents
and
for
those
who
work
in
the
City.

The
service
will
include
 transporta3on
between
a
centrally
located
Transit
Hub,
where
individuals
will
be
dropped
off
from
County
or
 private
transporta3on
vehicles. Lib
Sta3on
30
Replacement Lib
Sta3on
32
Replacement Lib
Sta3on
9
Replacement Replace
Lib
Sta3on
5‐
Line
Wetwell
and
10
upstream
manholes Replace
Lib
Sta3on
6‐
Line
Wetwell
and
10
upstream
manholes 16"
Waterline
Replacement
at
Waterplant Inflow/Infiltra3on
Lib
Sta3ons
12 Inflow/Infiltra3on
Lib
Sta3ons
13 Inflow/Infiltra3on
Lib
Sta3ons
16 Inflow/Infiltra3on
Lib
Sta3ons
17 SW
178
Forcemain
Replacement Design
and
permiqng
of
a
new
sewer
plant SW
72
Avenue
Waterline
Replacement Rehabilita3on
Plants
1‐2
Wastewater
Plant Refurbish
Master
List
Sta3on
4
(Pumps,
piping,
electrical)
and
line
upstream
manholes Replacement
of
40‐50
year
old
waterlines
between
72
Ave
and
Turnpike
(mul3ple
phases
to
be
completed
in
 one
year) Citywide
Roadway
Resurfacing
Project Pinecrest
Gardens
Wastewater
System Stormwater
Drainage
Project Waterline
Expansion
Project Sanitary
Sewer
Libsta3on
Replacemenmts
#9,
#23,
#40 Homeland
Subdivision
Potable
Water
Distribu3on
System Homeland
Subdivision
Reclaimed
Water
Distribu3on
System Sanitary
Sewer
Libsta3on/Force
Main
Improvements
&
Sewer
Extensions Homeland
Subdivision
Drainage
System
‐
To
upgrade
the
exis3ng
rural
standard
open
drainage
swales
to
a
 modern
URBAN
system.

This
will
provide
150+
residents
and
businesses
with
enhanced
drainage
capabili3es
 and
flood
protec3on.

Addi3onally,
sidewalk Longhill
Drive
Drainage
Improvements Energy
‐
Energy
Efficiency
Improvements
at
City
Office
Buildings Emergency
Management
‐
Harden
Technical
Services
Building

‐

To
Afford
the
Public
Works
Administra3on
 Addi3onal
Shelter
Space
and
a
centralized
PW
Opera3ons
EOC Transporta3on
‐
Traffic
Signaliza3on
Improvements
at
124th
Avenue
and
Belcher
Road Transporta3on
‐
Installa3on
of
Sidewalks
and
ADA
Enhancements
to
Promote
Walking
and
Help
Reduce
Vechile
 Trips Transporta3on
‐
Public
Parking
Lot
at
the
Pinellas
Park
Performing
Arts
Center
(Downtown)

Pinellas
Park

FL

Streets/Roads

Transporta3on
‐
Traffic
Signaliza3on
at
40th
St.
and
Gateway
Blvd.

Planta3on

FL

CDBG

Planta3on

FL

CDBG

Planta3on

FL

CDBG

Planta3on

FL

Energy

Move
approximately
2
miles
of
overhead
u3lity
lines
underground
to
promote
electric
reliability
and
economic
 security
in
our
community.
This
would
enhance
reliability,
reduce
frequency
and
severity
of
outages
due
to
 hurricanes,
reduce
opera3ng
and
maint North
Acres
Park
Development
to
include
wetlands,

boardwalk,
picnic
structures,
restrooms
and
playground
 equipment. Renova3on
and
expansion
of
an
exis3ng
community
center
that
would
be
used
primarily
for
senior
programs
 and
ac3vi3es Energy
saver
pool
cover
system
to
minimize
heat
loss
and
reduce
water
costs
and
preserve
chemicals.

Funding
Required 












500,000


Jobs 7












1,000,000
 












450,000
 












400,000
 












500,000
 












500,000
 












500,000
 












500,000
 












250,000
 












400,000
 










1,000,000
 












300,000
 












500,000
 












400,000
 












450,000
 












400,000
 












400,000
 










2,000,000
 










1,200,000
 










1,250,000
 










2,500,000
 










3,000,000
 










2,500,000
 










1,150,000
 










3,000,000
 










2,000,000
 










4,500,000
 










4,500,000
 












450,000


10 10 10 12 12 12 12 15 15 20 20 25 25 25 25 25 30 30 35 35 35 35 40 40 50 60 60 0












1,053,724
 












160,000
 












160,000
 












160,000
 












120,000
 












120,000
 












400,000
 












500,000
 












500,000
 












500,000
 












500,000
 












500,000
 








15,000,000
 












800,000
 










2,000,000
 










1,200,000


16 5 5 5 10 10 20 20 20 20 20 20 25 25 30 100










30,000,000
 










7,000,000
 












150,000
 












600,000
 








12,500,000
 












492,500
 












895,000
 










1,000,000
 










1,600,140


100 50 5 30 100 3 6 7 11












3,200,000
 










4,245,835
 










1,000,000


22 30 7












1,000,000
 












300,000


7 2














500,000


4














500,000


4














523,000


4












2,000,000


15












1,200,000


15












2,500,000


20
















50,000


1

City

State

Program

Planta3on

FL

Energy

Install
(4)
1350
gallon
water
tanks
to
collect
rain
water
for
re‐use
as
make‐up
water
for
(1)
olympic
size
pool.

Project
Descrip3on

Funding
Required 














15,000


Jobs

Planta3on

FL

Energy
















25,000


1

Planta3on

FL

Energy

Variable
Frequency
Drive
(VFD)
and
chemical
controller
for
pool
pump
motor
protec3on
and
energy
savings
to
 interface
with
systems
controler. Conversion
of
100
city
vehicles
to
CNG
and
construc3on
of
a
CNG
refueling
sta3on.














750,000


5

Planta3on

FL

Energy

Install
150
solar
walkway
lights
for
pathways
within
five
city
parks.














180,000


5

Planta3on

FL

Energy












1,500,000


10

Planta3on

FL

Public
Safety

Planta3on Planta3on Planta3on Planta3on Planta3on Planta3on Planta3on

FL FL FL FL FL FL FL

Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety
















25,000
 












232,000
 












500,000
 












962,500
 












500,000
 










1,200,000
 












113,000


2 2 3 4 5 5 5












2,350,000


15

Planta3on

FL

Public
Safety










22,000,000


15

Planta3on

FL

Public
Safety

Methane
Gas
Conversion‐Methane
gas
is
a
by‐product
from
trea3ng
wastewater.
The
gas
would
be
cleaned,
 scrubbed,
and
compressed
to
be
used
as
electric
power
to
operate
equipment
in
the
wastewater
plant Strengthen
a
400
foot
Public
Safety
communica3ons
tower
to
enable
installa3on
of
addi3onal
Public
Safety
 antennas
and
cameras. Upgrade
current
public
safety
radio
system Mobile
Command
Unit In‐car
dash
cameras
(175@$5,500) Five
addi3onal
police
officers
and
equipment
to
create
Special
Opera3on
Crimes
Unit Purchase
replacement
100+
foot
aerial
apparatus Relocate
Public
Safety
Dispatch
into
more
secure
area
of
Police
Department
Building. Construct
a
for3fied
bunker
to
house
all
Informa3on
Technology
servers
and
associated
hardware
for
all
city
 equipment
including
Police,
Fire
and
Emergency
Management.

Facility
will
also
be
used
for
addi3onal
office
 space,
general
storage,
etc. Create
a
city‐wide
WiFi
network
to
enable
Public
Safety
(Police,
Fire
and
EMS)
to
access
the
wireless
network
 for
Computer
Aided
Dispatch
and
to
access
and
create
data
in
the
field. Fire
Sta3on
#1.
Replace
exis3ng
aging
sta3on
with
a
12,000
sq
b
structure
with
four
aparatus
bays












4,000,000


25

Planta3on

FL

Public
Safety

Fire
Training
Center
with
four
aparatus
bays
12,000
sqare
feet












4,000,000


25

Planta3on

FL

Streets/Roads












1,000,000


10

Planta3on

FL

Streets/Roads












1,350,000


10

Planta3on

FL

Streets/Roads












1,700,000


15

Planta3on

FL

Transit

Construct
a
vehicular
bridge/pedestrian
crossing
to
replace
an
exis3ng
bridge
connec3ng
a
park
with
a
 school/parking
lot. Resurface
35
residen3al
streets
in
the
Sunrise
Heights
and
Mirror
Lake
subdivisions
using
mill
and
recycling
 pavement
process. Replace
2.5
miles
of
concrete
and
grass
drainage
swales
damaged
or
destroyed
due
to
age
(35‐40
yrs)
with
 drainage
pipe
infrastructure. Construc3on
of
transit
stops
in
Midtown
Planta3on
including
various
signage
and
wayfinding
signage.














140,000


3

Planta3on

FL

Transit










12,500,000


100

Planta3on

FL

Transit












6,900,000


100

Planta3on

FL

Water

Planta3on Planta3on Planta3on Planta3on Planta3on Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy














800,000
 










1,800,000
 










1,545,000
 










1,750,000
 










3,000,000
 










8,300,000
 










1,500,000
 










3,500,000
 












800,000
 










3,000,000
 










3,750,000
 










1,500,000
 












800,000
 










2,000,000
 










2,000,000
 








15,000,000
 










2,500,000
 










6,500,000
 












100,000
 










1,600,000
 










1,500,000


5 10 10 10 20 45 10 15 20 25 25 25 30 40 40 40 50 100 2 12 20

Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie

FL FL FL FL FL FL FL FL FL FL FL

Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

Construct
a
500
space
park
and
ride
parking
facility
that
would
connect
with
trolley
transporta3on
in
Midtown
 Planta3on,
Broward
County
Transit
and
proposed
FDOT
rapid
transit
along
the
I‐595
corridor. Rehabilita3on
of
exisi3ng
roadways
(NW
84th
Avenue
and
NW
78th
Avenue)
into
Transit
Greenways
providing
 narrower
streets,
pedestrian
and
bicycle
walkways
and
paths
with
street
furniture Storm
water
protec3on
project
that
would
reinforce,
extend
and
enhance
an
exis3ng
berm
providing
 stormwater
protec3on
to
Planta3on
Acres. Pine
Island
Park
drainage
improvement
project
for
playing
fields
and
parking
lots. Regional
wastewater
treatment
plant,
prelimminary
treatment
building
rehabilita3on Regional
wastewater
treatment
plant,
primary
odor
control
system
rehabilita3on Potable
water
distribu3on
system
Planta3on
Park
water
main
rehabilita3on
project Sanitary
sewer
collec3on
system
rehab,
Planta3on
Gardens,
Phase
II Tiffany
Pumpsta3on
Upgrade
for
Drainage Boat
Launching
Park Florresta
Pines
Drainage
Improv. Botanical
Gardens
Facility SW
Neighborhood
Park Village
Green/Hog
Pen
Slough
Drainage
Improvments ParksEdge
Road
Drainage
Improvements Drainage
Improvements
for
Calmosa,
Lakehurst,
Cur3s
&
Lucera Midport
I
&
Eastport
I
Drainage
Repairs
&
Improvements Torino
Regional
Park Dredging
8
canals Ravenswood
Community
Ctr.
Construc3on Traffic
Signal
Enhancement
to
LED
system
‐
saves
power Retrofit
civic
Center
with
a
photovoltaic
system. Blackwell
Pumpsta3on
Energy
Conversion
from
fossil
to
electric Conduct
energy
analysis
surveys
of
exis3ng
conserva3on
recommenda3ons,
sub‐contract
for
conserva3on
 upgrades
and
track
results. Automa3c
Vehicle
Locators
(approx.
200
patrol
cars) Bio‐Metric
Fingerprint
Scanners
(1
per
patrol
car) Handheld
computers
(12) Help
Desk
Sobware
for
Police
Dept. Non‐Lethal
Taser
Shotguns
(25)
and
cartridges T3
Mo3on
Vehicles
(2)
for
Civic
Center/Eastern
Region Laptop
Technician
for
Patrol Police
Exchange
Administrator
(email
system) Police
Web/Portal
Manager Gang
Unit

(1
Sgt./4
Officers)((includes
salary,
benefits,
related
equipment
and
vehicle) Hot
Spot
Suppression
Unit
(1
Sgt./4
Officers)(includes
salary,
benefits,
related
equipment
and
vehicle)












7,500,000
 












400,000
 












200,000
 














96,000
 














20,000
 














12,500
 














20,000
 














40,000
 














50,000
 














50,000
 












643,697


160 0 0 0 0 0 0 1 1 1 5

Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie

FL FL FL FL FL FL FL FL

Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Police
Officer
Staffing
‐
restore
staffing
level
to
1.75
officers
per
1,000
of
popula3on Kingsway
Waterway
Drainage
Repairs Replacement
of
cross
street
Culverts,
30 Swale
Drainage
Improvements
6
miles Bridge
Repairs,
27 Citywide
sidewalks
@designated
School
sites
6
miles E
8
Canal
1.5
miles Howard
Creek
Drainage
Improvements
5000
linear
feet














643,697
 










1,000,000
 












750,000
 












240,000
 










1,000,000
 












500,000
 










3,000,000
 










2,000,000
 










1,500,000


5 10 20 20 20 25 30 30 30

1

City

State

Program

Port
St.
Lucie

FL

Streets/Roads

Port
St.
Lucie

FL

Streets/Roads

Port
St.
Lucie

FL

Streets/Roads

Port
St.
Lucie

FL

Streets/Roads

Port
St.
Lucie

FL

Port
St.
Lucie

Project
Descrip3on Construct
and
install
24
hurricane
resistant
transit/school
bus
stop
shelters
with
concrete
founda3ons
and
 bicycle
racks,
at
various
loca3ons
throughout
the
City
of
Port
St.
Lucie. Large
Culvert
Replacement
20
loca3ons,
arterials
&
majors

Funding
Required

Jobs














440,000


35












2,500,000


40














110,000


45














850,000


46

Streets/Roads

The
extension
of
the
southbound
right
turn
lane
at
the
intersec3on
of
Prima
Vista
Boulevard
and
Bayshore
 Boulevard
to
increase
the
efficiency
of
the
intersec3on
and
address
safety
concerns
and
issues. Expand
Traffic
Monitoring
System
for
efficient
management
of
traffic
flow
throughout
the
city.
Includes
the
 installa3on
of
conduit
fiber
op3c
cable,
traffic
monitoring
cameras
and
associated
enhancements. Overlay
70
miles,
major
collectors
and
secondary
roads












4,000,000


50

FL

Streets/Roads

Becker
Road
Widening
(4
lanes)
‐
Segment
4
from
Paley
Road
to
Florida's
Turnpike
(0.50
miles)












5,000,000


52

Port
St.
Lucie

FL

Streets/Roads












2,950,000


54

Port
St.
Lucie

FL

Streets/Roads

Traffic
Signals
(one
new
&
3
up‐grades)
from
span‐wire
to
current
hurricane
wind
load
requirements.
Includes
 the
installa3on
of
mast
arms,
video
detec3on,
traffic
monitoring
equipment
and
associated
enhancements. Floresta
Drive
Widening
(4
lanes)
‐
segment
1
from
Southbend
Blvd.
to
Port
St.
Lucie
Blvd.
(0.70
miles.)

Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Port
St.
Lucie Riviera
Beach

FL FL FL FL FL FL FL FL FL FL

Streets/Roads Streets/Roads Water Water Water Water Water Water Water Public
Safety












7,000,000
 










9,000,000
 








12,000,000
 










1,800,000
 










2,500,000
 










8,000,000
 










2,500,000
 










2,000,000
 










6,000,000
 










7,000,000


72 93 124 10 10 10 10 15 15 15














500,000


25

Riviera
Beach

FL

Transit












3,163,545


100

Riviera
Beach

FL

Water












1,000,000
 














66,925
 










1,500,000
 












250,000
 










6,000,000
 










1,500,000


30 8 60 10 120 30












6,500,000
 












500,000
 










1,000,000
 










1,500,000


130 12 20 30

Becker
Road
Widening
(4
lanes)
‐
Segment
2
from
Tacoma
St.
to
Albacore
St.
(0.90
miles) Becker
Road
Widening
(4
lanes)
‐
Segment
3
from
Albcore
to
Paley
Road
(1.2
miles) Sewer
step
tank
conversions
to
grinders
(old
GDC) Southport
reuse
storage
tank Transite
force
main
replacement
(old
GDC) Westport
reuse
storage
pond
lining Force
main
replacements
required
for
sewer
step
tank
conversio9ns
(old
GDC) Prineville
deep
injec3on
well
for
concentrate Reuse
line
from
Glades
to
Saint
Lucie
West ‐Law
Enforcement
Technology
Improvement
Project‐
Purchase
State‐of‐The‐Art
broadband
wireless
data
 communica3on
system
for
public
safety. Decora3ve
Street
Lights
Project
along
Florida
State
Road
A1A
which
includes
the
installa3on,
materials
and
 con3ngency
for
333
poles
with
fixtures
and
banner
arms. ‐Storm
Water
Management
Plan‐ The
City
will
be
implemen3ng
a
storm
water
management
plan
and
will
construct
a
new
storm
water
drainage
 system
that
will
provide
reten3on
and/or
deten3on
of
runoff
to
meet
water
qualit
requirements
that
will
result
 in
 Stormwater
Improvements West
Nova
Water
and
Sewer
Improvements Non‐Automo3ve
Transporta3on
Project Public
Works
Facility
LEEDS
Standard Oaklea
Bridge
Replacement
(Vehicle
and
Pedestrian) US1
Streetscape
(Undergrounding
U3li3es,
Reuse
Water
Lines,
Roadway
Improvements,
Sidewalk
 Improvements,
Streetligh3ng
and
Signaliza3on Bus
Turn‐offs
on
US1 Teague
Street
Sewer
Extension Lib
Sta3on
Improvements
(lib
sta3ons
1,8,
and
9 Replacement
of
Fire
Alarm
and
Public
Address
Systems
in
the
Passenger
Terminal
‐
This
project
is
to
replace
the
 now
20
year
old
Fire
Alarm
and
Public
Address
Systems
in
the
Passenger
Terminal
Building North
General
Avia3on
Apron
Rehabili3a3on
to
reconstruct
and
overlay
with
new
asphalt

South
Daytona South
Daytona South
Daytona South
Daytona South
Daytona South
Daytona

FL FL FL FL FL FL

CDBG CDBG Energy Energy Streets/Roads Streets/Roads

South
Daytona South
Daytona South
Daytona Tallahassee

FL FL FL FL

Transit Water Water Airport

Tallahassee

FL

Airport

Tallahassee

FL

Airport

Tallahassee

FL

CDBG

South
General
Avia3on
Apron
Rehabilita3on
to
demolish
and
reconstruct
pavement,
drainage
system,
and
base
 material Renovate
main
building
at
Smith
Williams
Community
Center

Tallahassee

FL

CDBG

Replace
all
windows
at
Smith
Willliams
Community
Center
main
building

Tallahassee

FL

CDBG

Reloca3on
and
upgrade
of
overhead
electrical
lines
to
support
the
Gainest
Street
Redevelopment

Tallahassee

FL

CDBG

Tallahassee

FL

Tallahassee

FL

Tallahassee












1,900,000


5












6,600,000


30












7,700,000


30
















50,000


5














150,000


5












1,500,000


8

ADA‐compliance
renova3ons














200,000


10

CDBG

Construct
an
elevator
at
Smith
William
Community
Center














150,000


10

CDBG

Dorothy
B.
Oven
Park
add/
renovate
concrete
unit
pavers
for
all
pedestrian
walk
ways














200,000


10

FL

CDBG

Interior
renvoa3on
of
annex
building
at
Smith
Williams
Community
Center














100,000


10

Tallahassee

FL

CDBG














200,000


10

Tallahassee

FL

CDBG














200,000


10

Tallahassee

FL

CDBG

Myers
Park
Upgrade
4000
sq.
feet
sidewalk,
construct
an
urban
walking
trail,
handicap
accessible,
Add
fitness
 sta3ons,
new
walk
bridges,
improve
grad
around
comfort
sta3on
and
remodel
exis3ng
Comfort
sta3on












 Myers
Park
Upgrade
4000
sq.
feet
sidewalk,
construct
an
urban
walking
trail,
handicap
accessible,
Add
fitness
 sta3ons,
new
walk
bridges,
improve
grad
around
comfort
sta3on
and
remodel
exis3ng
Comfort
sta3on
 Playground
upgrades



















250,000


10

Tallahassee

FL

CDBG

Renovate
interior
of
gymnasium














150,000


10

Tallahassee

FL

CDBG














280,000


10

Tallahassee

FL

CDBG












1,530,000


15

Tallahassee

FL

CDBG














250,000


15

Tallahassee

FL

CDBG

Winthrop
Park
upgrade
Develop
and
construct
drainage
plan
to
control
erosion
on
East
side,
Replace
sidewalk
 and
drainage
around
tennis
courts,
improve
ball
fields
construct
retaining
walls















 Bicycle
and
Pedestrian
Master
Plan‐
milling/resurfacing/restriping
to
create
a
route
for
cyclists
to
bypass
one
of
 the
busiest
downtown
streets Lake
Ella
Upgrades:
Wall
and
erosion
control
on
North
side
of
lake,
Improve
street
drainage
curb
and
gufer
 parking
lot,
and
street
add
irriga3on


 Replace
fence
in
various
parks















500,000


15

Tallahassee

FL

CDBG

Replace
old
boardwalks,
Picnic
shelter
renova3ons














500,000


15

Tallahassee

FL

CDBG

Gaines
Street
Revitaliza3on‐
Water
and
Sewer
upgrades
and
replacement
of
inadequate
pipes












1,640,000


20

Tallahassee

FL

CDBG

Retrofit
roof
system
at
Smith
Williams
Community
Center














500,000


25

Tallahassee

FL

CDBG












2,454,000


28

Tallahassee

FL

CDBG

Bicycle
and
Pedestrian
Master
Plan‐
construct
six
missing
sidewalk
segments
to
provide
safe
access
to
several
 elementary
schools Curb
and
gufer/asphalt
for
park
parking
in
various
parks













1,000,000


30

Tallahassee

FL

CDBG

Reconstruct
curb,
gufer,
sidewalk
and
milling
and
overlay
roadway
for
Gaines
Street
Corridor












3,500,000


30

Tallahassee

FL

CDBG

Tallahassee

FL

CDBG

Tom
Brown
Park
Upgrades
Repave
tennis
courts
and
stabilize
soil,
upgrade
court
lights,
fencing,
bleachers,
add
 metal
roof
and
renovate
control
sta3on
bathroom
roof,
grading
improvements
around
courts,
Dam
renova3on
 at
Lake
Leon,
replace
ball
field
light Historical
restora3on
of
the
Ashmore/Yates
block
and
Frenchtown
Village
construc3on












1,500,000
 










1,500,000


30 50

City

State

Program

Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG Energy Energy Energy Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Public
Safety

Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee

FL FL FL FL FL FL FL FL FL FL FL FL FL

Schools Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Water Water Water Water

Tallahassee Tallahassee Tallahassee Tallahassee Tallahassee Tamarac

FL FL FL FL FL FL

Water Water Water Water Water Energy

Tamarac

FL

Energy

Tamarac

FL

Energy

Tamarac

FL

Streets/Roads

Tamarac

FL

Water

Tamarac

FL

Water

Tamarac

FL

Water

Tamarac

FL

Water

Tampa

FL

CDBG

Tampa

FL

CDBG

Tampa

FL

CDBG

Tampa

FL

Energy

Tampa

FL

Energy

Tampa

FL

Energy

Project
Descrip3on Providence
Neighborhood
ditch
and
sidewalk
improvements Low‐Income
Home
Energy
Efficiency
Retrofit
for
1000
homes 1000
Solar
Roobops‐
80%
grant
for
ci3zens Turbocor
Compressor
commercial
building
retrofit
80%
grant District
Cooling
with
Ice
Storage/
2
megawafs Addi3onal
parking
for
Springfield
Community
Center Install
low
water
pressure
toilets Paint
front
and
rear
doors
for
neighborhood Playground
construc3on
to
prevent
gang
membership
and
create
posi3ve
alterna3ve Repair/replace
exis3ng
sidewalks Replace
bathroom
sinks
in
vacant
units Replace
damaged
or
extended‐life
roofs Replace
kitchen
cabinets
in
vacant
units Security
camera
system
for
community
centers Upgrade
appliances
with
energy
star
reated
items Upgrade
kitchen
countertops Replace
bathroom
floors
in
two‐story
buildings Energy
efficient
windows,
roof
and
appliances
upgrade Resident
skill
training
center Erosion
control
to
improve
safety
and
property
values Implemen3ng
a
surveillance
camera
system
throughout
downtown
business
district
and
adjoining
Gaines
 Street
corridor
‐
u3lizing
technology
as
a
tool
for
crime
reduc3on Schools
on
Solar
Program
‐
solar
energy
in
school
facili3es Capital
Circle
Northwest/Southwest
Demoli3on Raymond
Diehl
Road
Improvements,
curb,
gufer,
sidewalks
and
bike
lanes New
Cascade
Lane
and
Intersec3on
Improvements
to
improve
safety
and
con3nuity Increase
StarMetro
administra3ve
office
building StarMetro
wellness
center Upda3ng
and
expanding
C.K.
Steele
transit
hub Replacement
buses
for
StarMetro,
which
has
30
buses
which
are
past
their
useful
life Construc3on
of
StarMetro
(transit
system)

regional
training
center Pump
Sta3on
70
Construc3on Capital
Circel
Southeast
Sinkhole
repair Pump
Sta3on
53
Construc3on Cascade
park
Sanitary
Sewer
Replacement
to
reduce
high
fecal
coliform
in
adjacent
stream
and
reduce
costs
at
 treatment
center Northeast
Capital
Circle
Force
Mail
Replacement Cascade
Park
Spot
Remedia3on‐
excava3on
and
removal
of
soil
from
impacted
areas Cascade
Park
Stormwater
Project‐
By‐Pass
Box
Culvert Capital
Circle
Northwest
Regional
Stormwater
Pond
and
Park
Enhancements Delta
Regional
Stormwater
Management
Facility
construc3on Conversion
to
LED
street
lights.
Tradi3onal
technology
would
be
replaced
with
Energy
efficient
LED
ligh3ng,
 resul3ng
in
savings
of
265,000
Kwafs
per
year Data
center/desktop
virtualiza3on ini3a3ve
to
increase
efficiency
and
reduce
entrgy
usage
by
virtualizing
24
servers
and
200
desktop
computers
 with
two
energy
smart
servers.

Resul3ng
savings
of
117,531
Kwats
annually Municipal
solar
panels
‐
retrofiqng
of
city
facil3es
with
solar
panels
resul3ng
in
savings
of
250,000
Kwafs
per
 year Construc3on
of
integrated
systems
of
bike
lanes/walkways
to
provide
alternate
transportaiton
opportuni3es.

 Narrow
roads
to
not
allow
for
"sharing"
of
roadways
for
alternate
transportaiton. replacement/upgrade
of
piping
and
pumps
at
City's
wastewater
pump
sta3ons
located
throughout
city.

Project
 would
ensure
reliability
of
operaton
and
prevent
failure
resul3ng
in
contamina3on
 Infrastructure
infiltra3on
and
inflow
reduc3on
City
would
reline
es3mated
10
miles
of
gravity
sewer
system
 pipes
serving
to
propect
the
environment
and
water
source
by
reducing
the
amount
of
wastewater
discharged
 by
2.6
billion
gallons
 Water
recovery;
installa3on
of
backwash
recovery
equipment
to
recover
water
from
package
filters
for
reuse.

 Would
conserve
by
reusing
up
to
300,0000
gallons
of
water
perday
currently
being
discharged
to
surface
 waters. Economic
cevelopment
redevelopment
in3a3ve‐
Mainstreet
Town
Center
Project.

Revitaliza3on
of
corridor
 required
in
form
of
construc3on
of
potable
water,
sanitary
sewer
and
stormwater
drainage
systems($1.6
 milllion)
 Seminole
Garden
Center. Renova3on
of
exis3ng
community
center. NFL
YET
Community
Center
Addi3on. Project
provides
for
an
audio
visual
studio
and
weight
room
addi3on
to
exis3ng
community
center. Springhill
Park. New
14,000
sf
community
center,
building
built
to
sa3sfy
silver
LEED
requirements. Climate
Control. This
project
provides
for
the
replacement
of
deteriorated
HVAC
(hea3ng,
ven3la3ng,
air
condi3oning)
systems
 at
various
city
facili3es.
Many
of
these
systems
have
exceeded
their
useful
lives
and
replacement
units
will
 produce
both
en Energy
Management
Systems. This
project
provides
for
the
installa3on
of
energy
management
systems
at
various
city
facili3es
to

reduce
and
 op3mize
electrical
consump3on.
System
also
allow
remote
monitoring
so
that
problems
are
addressed
quickly. Fleet
Maintenance
Ligh3ng. This
project
provides
for
the
replacement
of
deteriorated
and
inefficient
ligh3ng
at
the
fleet
maintenance
 service
facility
with
high
efficiency
ligh3ng
that
will
reduce
electrical
usage
and
improve
ligh3ng
quality.

Funding
Required 










8,907,285
 










3,000,000
 










4,000,000
 










5,000,000
 










5,000,000
 















5,000
 














36,000
 














30,500
 














36,000
 












152,500
 












157,150
 












338,000
 














48,000
 














40,000
 














21,000
 












375,000
 














39,000
 












250,000
 














10,000
 












250,000


Jobs 70 100 100 100 125












7,500,000
 










5,000,000
 












500,000
 










3,000,000
 










2,850,100
 












301,688
 












175,208
 












245,000
 








11,730,000
 










1,657,532
 












540,000
 












250,000
 












750,000


75 150 10 22 35 10 10 10 30 100 8 10 10














891,930
 










7,800,000
 












250,000
 










4,239,115
 










1,200,000
 










7,725,000


12 22 25 50 59 100














300,000


8














182,000


8














800,000


20












4,000,000


50














800,000


12












2,000,000


20












2,200,000


25












4,500,000


45












1,500,000


20














500,000


30












3,600,000


50














150,000


10














100,000


10














100,000


10

2 12 12 25

City

State

Program

Tampa

FL

Energy

Tampa

FL

Energy

Tampa

FL

Energy

Tampa

FL

Energy

Tampa

FL

Energy

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Streets/Roads

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Project
Descrip3on Fire
Sta3on
Roof
Replacements. This
project
provides
for
the
replacement
of
exis3ng
fire
sta3on
roofs.
Reroffing
is
necessary
to
maintain
 viability
of
sta3ons.
Roof
types
vary,
but
Cool
Roof
type
materials
to
be
u3lized
in
all
loca3ons
possible. Old
City
Hall
Elevator
restora3on. Project
provides
for
the
replacement
of
an
exis3ng
manual
passenger
elevator
with
an
automa3c
system.
New
 controls
will
provide
energy
efficiency
and
savings. Parking
Garage
Ligh3ng
Upgrade. This
project
provides
for
the
replacement
of
deteriorated
and
inefficient
ligh3ng
in
parking
garages
with
high
 efficiency
ligh3ng
that
will
reduce
electrical
use
and
increase
safety
in
the
garages. Roof
Replacement. This
project
provides
for
replacement
of
deteriorated
roofs
at
various
city
owned
facili3es.
The
new
material
 will
be
Cool
Roof
Ra3ng
Council
approved
and
provide
reduced
heat
gain
which
results
in
energy
savings. Tampa
Municipal
Office
Building
Climate
Control
(HVAC)
System
Upgrade. This
project
provides
for
the
replacement
of
10
‐
31
year
old
deteriorated
air
handlers
and
ductwork. Brorein
Street
Bridge
Improvements. Rehabilita3on
of
exis3ng
movable
bridge. School
Zone
Flasher
Implementa3on. Installa3on
of
19
School
Zone
Flashers
at
9
Elementary/Middle
Schools
in
the
City
of
Tampa. Bayshore
Balustrade.
Implementa3on
of
structural
repair
of
ballustrade
on
bayshore.
Balustrade
and
seawall
 provide
eastern
edge
of
Bayshore
Blvd
corridor
a
major
city
arterial. Citywide
Sidewalk
Improvements.
Project
provides
for
installa3on
of
new
sidewalks
in
loca3ons
without
 sidewalks. Citywide
Sidewalk
Repair
and
Replacement.
Project
provides
for
repair
and
replacement
of
exis3ng
sidewalks
 and
accessibility
improvements. Dale
Mabry
/
Kennedy
Blvd
Intersec3on
Improvements. Project
provides
for
comprehensive
improvements
to
this
major
intersec3on. Fleet
Maintenance
Bulk
Fluid
Distribu3on
System.
Project
provides
for
installa3on
of
bulk
fluid
delivery
system,
 which
eliminates
use
of
barrells
and
drum
storage
for
various
vehicle
fluids. Mac
Dill
/
Kennedy
Blvd
Intersec3on
Improvements. Project
provides
for
comprehensive
improvements
to
this
major
intersec3on. River
Garden
Shoreline
Improvements
Phase
II.
Con3nua3on
of
shoreline
restora3on
north
of
columbus.
 Shoreline
and
greenspace
provide
waterside
edge
of
exis3ng
roadway. Tampa
Theatre
Electrical
Room
Upgrade.
Project
provides
for
new
roof
and
roof
structure
over
exis3ng
 electrical
room
at
theatre.
Roof
also
serves
as
the
sidewalk
for
Polk
St. Cass
Street
Bridge
Improvements. Rehabilita3on
of
exis3ng
movable
bridge. Laurel
Street
Bridge
Improvements. Rehabilita3on
of
exis3ng
movable
bridge. Citywide
Roadway
Resurfacing.
Provides
for
resurfacing
of
exis3ng
city
roadways.
Project
provides
for
approx.
 10
miles
of
resurfacing. HFC
AWTP
‐
60‐inch
Flow
Meter
Replacement
at
Meter
Vault
#2.
The
project
scope
is
to
replace
the
60‐inch
 flow
meter
(MRC‐2)
at
the
main
wastewater
treatment
plant
with
a
new
magne3c
flow
meter
and
all
 associated
electrical
work. Morrison
Pump
Sta3on
Rehabilita3on. Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater
pumping
sta3on. San
Carlos
Pump
Sta3on
Wet
Well
&
Screen
Room
Rehabilita3on.
Project
provides
for
the
restora3on
of
 exis3ng
pump
sta3on
components
including
concrete
repair,
ducts,
alarms
and
skylights. Knights:
Harborview
to
Lawn. Line
exis3ng
stormwater
box
culvert
in
place. Boxwood
Drive
Distribu3on
Main. Replacement
of
2,474
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Boxwood
Drive
area.

The
 exis3ng
mains
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire
protec Gomez
Pump
Sta3on
Rehabilita3on. Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater
pumping
sta3on. Halifax
Drive
Distribu3on
Main. Replacement
of
2,914
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Halifax
Drive
area.

The
 exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire
pr Olympia
Avenue
Distribu3on
Main. Replacement
of
2,362
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Olympia
Avenue
 area.

The
exis3ng
pipelines
are
undersized
and
asbestos
lined.

The
new
pipeline
will
improve
water
pressure, 124th
Avenue:
Taliaferro
to
15th
Street
Force
Main
Replacement.
Project
consists
of
the
installa3on
of
3,500
 feet
of
6‐inch
force
main
in
124th
Avenue

between
Taliaferro
and
15th
Streets.

The
work
also
includes
a
jack
 and
bore
crossing
under
CSX
railroad Bayerle
Circle
Distribu3on
Main. Replacement
of
3,922
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Bayerle
Circle.

 The
exis3ng
mains
are
undersized
and
asbestos
lined.

The
new
pipeline
will
improve
water
pressure,
service Gunlock
Avenue
Distribu3on
Main. Replacement
of
4,364
linear
feet
of
8‐inch
diameter
water
distribu3on
main
in
the
Gunlock
Avenue
area.

The
 exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability HFC
AWTP
HVAC
Improvements
at
Administra3on
Building.
Project
provides
for
comprehensive
replacement
 and
upgrade
of
exis3ng
HVAC
system
for
buildng
at
the
main
wastewater
treatment
plant.
Includes
new
air
 handlers
and
chiller
and
associated
work
 Museum/Cur3s
Hixon
Park
Reclaimed
Distribu3on
Main. Installa3on
of
4,100
linear
feet
of
12‐inch
diameter
reclaimed
water
distribu3on
main
from
the
intersec3on
of
 Bayshore
Boulevard
and
Hyde
Park
Boulevard
to
Cur3s
Hixon
Park.
 San
Pablo
Place
Distribu3on
Main. Replacement
of
4,684
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
San
Pablo
Place
area.

 The
exis3ng
mains
are
asbestos
cement
lined
pipes.

The
new
pipeline
will
improve
water
pressure,
service

Funding
Required

Jobs














125,000


20














650,000


20














530,000


20














200,000


20












1,275,000


30












2,500,000


10














125,000


10














298,000


20












1,000,000


20












1,000,000


20












1,200,000


20














598,000


20












1,000,000


20














300,000


20














600,000


20












2,000,000


30












2,500,000


30












4,000,000


40














100,000


6














300,000


16














300,000


16














500,000


20














374,000


22














400,000


22














441,000


22














353,000


22














425,000


24














579,000


24














660,000


24














425,000


24














750,000


24














699,000


24

City

State

Program

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tampa

FL

Water

Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares Tavares

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL

CDBG CDBG CDBG CDBG Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Water

HFC
AWTP
Junc3on
Chamber
#1
Rehabilita3on
‐
Phase
1.
The
project
consists
of
the
removal
of
approximately
 750
cubic
yards
of
sand,
grit,
and
debris
from
Junc3on
Chamber
1
located
at
the
main
wastewater
treatment
 plant. Drew
Park
Distribu3on
Main. Replacement
of
7,468
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
Drew
Park.

The
 exis3ng
pipelines
are
undersized
and
are
not
looped.

The
new
pipeline
will
improve
water
pressure,
service
 reliability Larmon
Street
Distribu3on
Main. Replacement
of
7,527
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Larmon
Street
 area.

The
exis3ng
pipelines
are
undersized
and
asbestos
cement
lined.

The
new
pipeline
will
improve
water
 press Melrose
Street
Distribu3on
Main. Replacement
of
7,335
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Melrose
Street
 area.

The
exis3ng
pipelines
are
undersized,
unlined
cast
iron,
and
not
looped.

 42nd
Street
Pump
Sta3on
Rehabilita3on.
Project
provides
for
rehablita3on
and
upgrade
of
exis3ng
wastewater
 pumping
sta3on. Corona
Street
Distribu3on
Main. Replacement
of
5,077
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Corona
Street
 area.

The
exis3ng
pipelines
are
undersized.

The
new
pipeline
will
improve
water
pressure,
service
reliability HFC
AWTP
Road
Repairs
‐
replace
pavement
south
of
Dewatering
Building. The
project
includes
the
replacement
of
3,400
SY
of
exis3ng
failed
asphalt
pavement
with
concrete
pavement
 at
the
main
wastewater
treatment
plant. HFC
AWTP
Digester
#6
Rehabilita3on
‐
Phase
2. This
project
provides
for
the
rehabilita3on
of
an
exis3ng
digester
at
the
main
water
treatment
plant. Sewer
System
Evalua3on
Study
‐
Manhole
Rehabilita3on
‐
Phase
1. The
project
consists
of
the
rehabilita3on
of
approximately
100
manholes
in
the
Krause
Pumping
Sta3on
basin.

 The
rehabilita3on
will
involve
the
applica3on
of
a
structural
coa3ng,
rest Miscellaneous
Cured‐In‐Place‐Pipe
Rehabilita3on
Contract.
The
project
consists
of
the
rehabilita3on
of
gravity
 sewers
from
8‐inch
diameter
to
36‐inch
diameter
at
various
loca3ons
throughout
the
City
of
Tampa
 Wastewater
Department’s
service
area. Euclid
Box
Rehabilita3on. Shotcrete
exis3ng
stormwater
box
in
place,
no
room
in
r/w
for
replacement. Interbay
Water
Distribu3on
Main. Replacement
of
18,046
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Interbay
 neighborhood.

The
exis3ng
pipelines
are
undersized
mains.

The
new
larger
pipeline
will
improve
water
 pressure, Morrison
Distribu3on
Main. Replacement
of
18,273
linear
feet
of
6‐inch
and
8‐inch
diameter
water
distribu3on
main
in
the
Morrison
 Avenue
area.

The
exis3ng
pipelines
are
undersized
and
unlined
cast
iron.

The
new
pipeline
will
improve
water
 pressure, Davis
Islands
Distribu3on
Main. Replacement
of
26,670
linear
feet
of
6‐inch
diameter
water
distribu3on
main
on
Davis
Islands.

The
exis3ng
 pipelines
are
undersized
cast
iron.

The
new
pipeline
will
improve
water
pressure,
service
reliability
and
fire Spanishtown
Creek
Drainage
Improvements.
Three
phases:
Supplement
an
undersized
and
failing
stormwater
 box
culvert
system
($15m),
reinforce
and
restore
the
exis3ng
system
($3m),
and
extend
laterals
into
area
which
 depends
on
sheet
flow
($5m)
These
projec CIAC
Water
Transmission
Main
–
Area
No.
1 Construc3on
of
a
new
60,050
linear
feet
of
36‐inch
through
48‐inch
diameter
water
transmission
main
from
 the
David
L.
Tippin
Water
Treatment
Facility
to
downtown
and
South
Tampa.

Planned
redevelopment
in
Down Bruce
B.
Downs
Widening
‐
Segment
"B/C"
‐
JPA
with
Hillsborough
County. Project
consists
of
the
installa3on
of
18,000
feet
of
30‐inch
force
main
in
Bruce
B.
Downs
between
Palm
 Springs
Boulevard
to
Cross
Creek
Boulevard. Community
Back
Yard
Project
at
Aesop's
Park
 City
of
Tavares‐
Bury
Electrical
Lines

 Public
Furniture
Program,
Art
&
Way
Finding
Program


 Public
Works
Facility
Project Police/Fire/EOC
Reloca3on
Project Gateway
Improvement
Project
 Main
Street
Air
Quality
Improvement
Traffic
Circle
 Deteriora3ng
Roadway
and
Sidewalk
Restora3on
Project Tavares
Square
 Reconstruc3on
of
Ruby
Street
Corridor Reconstruc3on
of
Alfred
Street
Corridor Rail
Road
Track
and
Intersec3on
Crossing
Upgrades Rail
Road
Train
Sta3on
in
Down
Town
Tavares Tavares
Rail
Road
Bridge
Replacement Mixed
Use
Commuter
Rail
Public
Parking
Garage Rail
Road
Upgrades
(Plymouth
to
Tavares) Reclaimed
Water
Distribu3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II

Project
Descrip3on

Funding
Required

Jobs

Tavares

FL

Water

Reclaimed
Water
Distribu3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors
–
Phase
I

Tavares

FL

Water

Wastewater
Collec3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors
–
Phase
I

Tavares

FL

Water

Water
Distribu3on
System
Improvements
for
Alfred
Street
and
Ruby
Street
Corridors‐Phase
I

Tavares

FL

Water

Alleyway
Pervious
Paver
Block
Stormwater
Recharge
Project












2,000,000


80

Tavares

FL

Water

Water
Distribu3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II












6,690,000


268

Tavares

FL

Water

Wastewater
Collec3on
System
Improvements
to
Support
Downtown
Redevelopment
–
Phase
II












6,822,000


273

Tavares

FL

Water

CRA
Stormwater
Construc3on










10,000,000


400

Tavares

FL

Water

Reclaimed
Water
System
Implementa3on










18,000,000


720

Wellington

FL

CDBG

C2
Canal
Mi3ga3on
including
flood
afenua3on,
water
quality
enhancements
and
storage
of
surface
water














700,000


20














500,000


28












1,125,000


32












1,132,000


32












1,102,000


32














600,000


34














762,000


36














460,000


36














750,000


42














750,000


42












1,000,000


56












6,550,000


60












2,680,000


62












2,748,000


62












3,928,532


74










23,000,000


80










25,586,000


82












5,000,000
 












300,000
 












500,000
 










1,500,000
 










1,800,000
 










7,800,000
 










2,000,000
 










2,000,000
 










5,000,000
 










5,000,000
 










5,500,000
 










9,330,000
 










1,100,000
 










1,100,000
 










1,320,000
 










6,800,000
 








13,200,000


278 12 20 60 72 312 80 80 200 200 220 373 44 44 53 272 528














529,000


21














653,000


26












1,019,000


50














958,000


50

City

State

Program

Wellington

FL

CDBG

Barrier‐free
playground
on
community
center
site
for
special
needs
children

Project
Descrip3on

Funding
Required 










1,000,000


Jobs 25

Wellington

FL

CDBG

Amphitheater
construc3on
on
community
center
site
for
cultural
events

Wellington

FL

CDBG

Wellington

FL

CDBG

Wellington

FL

CDBG

Wellington

FL

CDBG

Wellington

FL

CDBG

Wellington

FL

Energy

Aqua3c
Center
Improvements
including
construc3on
of
office,
restrooms,
and
recrea3onal
areas
to
include
 pool
hardware Addi3on
of
fields,
prac3ce
areas,
and
public
access
to
vacant
Village‐owned
land
to
include
field
renova3ons
 and
equipment
replacement
at
exis3ng
parks Municipal
complex
construc3on
to
centralize
Village
offices
and
provide
significant
3me
and
opera3ng
savings
 per
LEED
standards Central
Business
District
Redevelopment
including
revitaliza3on
of
core
business
centers
including
land
 assembly,
development
incen3ves
and
infrastructure
expansion
to
facilitate
redevelopment Revitaliza3on
of
aging
residen3al
and
commercial
areas,
par3cularly
transi3onal
neighborhoods
experiencing
 high
crime
and
deteriora3ng
infrastructure Community
Center
Renova3ons
including
energy
retrofit
of
neighborhood
and
community
center












1,000,000


30












1,500,000


30












3,000,000


50










15,000,000


250










25,000,000


500










20,000,000


500












2,000,000


Wellington

FL

Streets/Roads

Resurfacing
of
Village
roads












1,500,000


150 30

Wellington

FL

Streets/Roads

Forest
Hill
Boulevard
‐
crea3on
of
a
main
street
including
roadway
construc3on,
pathways,
and
bike
lanes.












5,000,000


150

Wellington

FL

Streets/Roads

Southshore
Boulevard
‐
Road
widening












7,000,000


200

Wellington

FL

Transit

Trolley
system
to
serve
local
communi3es












1,200,000


10

Wellington

FL

Water












5,000,000


75

Wellington

FL

Water

Potable
Water
Facility
Renova3on
including
the
replacement
of
out‐of‐date
and
inefficient
water
systems
with
 more
effec3ve
and
efficient
systems Reuse
Water
System
Expansion
to
increase
reuse
transmission
and
distribu3on
to
preserve
water
resources












5,000,000


75

Wellington

FL

Water

Storage
Reservoir
construc3on
to
improve
source
water
capacity
in
industrial
and
medical
corridor












3,000,000


75

Wellington

FL

Water

West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach West
Palm
Beach Winter
Springs Winter
Springs Winter
Springs Winter
Springs Winter
Springs Acworth Acworth Acworth Acworth
 Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa

FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL FL GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA

CDBG CDBG CDBG Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads

Wastewater
Renova3on
Project
including
the
installa3on
of
new
technology
for
treatment
of
waste
effluent
for
 wastewater
u3lity
opera3ons Emergency
Generators
for
Facili3es Grassy
Waters
Preserve
Improvements Stormwater
Phase
III
Infrastructure
Projects Fire
Fleet
Replacement Police
Helicopter
Replacement Fire
Sta3on
Replacements
#4,
#5,
#8 Market
Street Parker
Avenue 33rd
Street Monceaux Spencer
Drive Lakewood
Road Monroe
Drive Broadmoor
Ave North
Flagler
Drive Meter
Change
Out Control
2
Replacement Okeechobee
Median
Improvements Control
4
Replacement Westward
Repump
Sta3on Aquifer
Storage
and
Recovery
Well
Rehabilita3on CIS
System
Upgrade Valley
Forge
Pump
Sta3on Water
Treatment
Plant
Improvements Water
Treatment
Plant
Improvements
‐
Tier
2 Cogenera3on
Facili3es
East
Central
Regional
Water
Reclama3on
Facili3es Hayes
Road
turn
lanes. Orange
Avenue
exten3on Vistawilla
Turn
lanes Wade
Street
improvements‐‐paing,
curbs,
drainage Blake
Blvd‐‐construc3on
of
a
new
road. City
of
Acworth,
Ga.
Const./Repair
parking,laydown,delivery
support
complex City
of
Acworth,
Ga.
Construct
road
enbankment
support
walls City
of
Acworth,
Ga.
Repave/repair
various
streets Construct
for
pedestrian
connec3vity,
sidewalks;
various
loca3ons

 North
Park
and
Wills
Park
Playground
Replacement Wills
Park
Picnic
Shelter
Replacement Alpharefa
Adult
Ac3vity
Center
Expansion Community
Center
Phase‐III Wills
Park
Pool
Renova3on Webb
Bridge
Park
Community
Center Department
Fleet
(police
vehicles
Qty:
125;
fire
vehicles
Qty:
9) Electronic
Fingerprin3ng
Equipment Off‐Road
Medical
Response
Vehicle
(Qty:
1) Rehab
Vehicle
(Qty:
1) Remote
Observa3on
and
Surveillance
Equipment Rescue
Vehicles
(Qty:
2) Self‐Contained
Breathing
Apparatus
(SCBA)
Air
Bofles Weapons
Replacement Automated
Tone
Alert
System Fire
Sta3on
(1‐4)
Floor
Refinishing Fire
Sta3on
(1‐4)
Ven3la3on
System Indoor
Shoo3ng
Range Broadwell
Road
and
Rucker
Road
(Intersec3on)










10,000,000
 












550,000
 












600,000
 










1,805,000
 










4,200,000
 










1,200,000
 








13,500,000
 










1,500,000
 










2,350,000
 










3,000,000
 










4,000,000
 










4,000,000
 










4,700,000
 










6,600,000
 








13,000,000
 








21,000,000
 












877,500
 












500,000
 












600,000
 










1,200,000
 










2,200,000
 










2,500,000
 










2,500,000
 










2,975,000
 










8,000,000
 








12,000,000
 








12,500,000
 












125,000
 












300,000
 












125,000
 












300,000
 










1,200,000
 










1,000,000
 










1,250,000
 










1,500,000
 












200,000
 












100,000
 














80,000
 












200,000
 










6,955,000
 










8,560,000
 








18,190,000
 










4,645,000
 














65,000
 














30,000
 












440,000
 












300,000
 












400,000
 














40,000
 












127,500
 












100,000
 












130,000
 












180,000
 










1,100,000
 












150,000


150 0 5 15 0 0 100 12 19 24 32 32 38 53 104 168 3 4 5 10 18 20 20 24 64 96 100 10 10 10 15 20 25 25 30 10 2 2 4 139 171 364 0 0 0 0 0 0 0 0 2 2 3 22 3

City

State

Program

Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Alpharefa Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens Athens

GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Airport Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads

Athens

GA

Streets/Roads

Athens

GA

Streets/Roads

Project
Descrip3on Citywide
Loop
Detector
Maintenance Marconi
Drive
(Windward
Pkwy
to
proposed
Big
Creek
Greenway
parking
lot) Bethany
Road
(Chelsey
Lane
to
Chan3lly
Drive) Windward
Parkway
and
North
Point
Parkway
(Intersec3on) Mid‐Broadwell
Road
and
Bethany
Road
(Intersec3on) Mid‐Broadwell
Road
Phase‐IV
(Wieland
property
to
Bethany
Road) Broadwell
Road
(Rucker
Road
to
Cathedral
Drive) Citywide
Traffic
Control
Equipment Citywide
Traffic
Striping
and
Signage Windward
Parkway
(North
Point
Parkway
to
Windward
Plaza) Douglas
Road
(Nasser
Avenue
to
McGinnis
Ferry
Road) Encore
Parkway
(North
Point
Parkway
to
GA
400) Mid‐Broadwell
Road
Phase‐III
(Fire
Sta3on
5
to
Wieland
property) Morris
Road
and
Old
Milton
Parkway
(Intersec3on) State
Route
9
(Upper
Hembree
Road
to
Northfall) Bethany
Road
and
Mayfield
Road
(Intersec3on) Old
Milton
Parkway
Pedestrian
Bridge Webb
Bridge
Road
(Westwind
subdivision
to
Webb
Bridge
Way) Douglas
Road
Pedestrian
Bridge
and
Sidewalk North
Point
Parkway
(Encore
Parkway
to
Haynes
Bridge
Road) North
Point
Parkway
Signal
Interconnect
and
Timing
(GDOT) Windward
Parkway
Signal
Interconnect
and
Timing
(GDOT) Kimball
Bridge
Road
and
Waters
Road
(Intersec3on)
‐
(GDOT) Rucker
Road
(4
separate
sec3ons
‐
see
CIP
Input
Form) Webb
Bridge
Road
and
Shirley
Bridge
Road
(Intersec3on)
‐
(GDOT) Citywide
Milling
&
Resurfacing Kimball
Bridge
Road
(Bridge
Replacement)
‐
(GDOT) Old
Roswell
Road
(Drainage) Lantern
Ridge
Court
(Stormwater) Citywide
Stormwater/Drainage
Repair Obstruc3on
Clearing
Runway
9 Apron
Rehabilita3on
Project
Phase
II Purchase
10
hybrid
vehicles Courthouse
Interior
/
Exterior
‐
Pain3ng


 Taylor
Grady
Interior
/
Exterior
‐
Pain3ng Convert
50
police
cars
to
run
on
U.S.
natural
gas
and
build
requisite
fueling
sta3ons Saferfield
Park
Ligh3ng
Upgrade

 Bishop
Park
Ballfield
Ligh3ng
Upgrade


 Holland
Sports
Complex
Ligh3ng
Upgrade

 Library
Carpet
Installa3on

 Construct
new
Evidence
and
forensic
facility
behind
PD Diversion
Center ENSAT
Expansion Rocksprings
Park
Revitaliza3on Police
HQ
Renova3on ACC
Library
Expansion Courthouse
Boiler
HVAC
Replacement



 Courthouse
Air
Handler,
Supply
Fan
,
Evaporator
Coil
‐
HVAC
Replacement
 Police
Roof
Top
Units
‐
HVAC
Replacement

 Civic
Hall
Roof
Replacement
 Costa
Building
Roof
Replacement


 Fleet
Management
Roof
Replacement
 Library
Cooling
Tower
&
Chillers
‐
HVAC
Replacement
 Energy
Audit
Courthouse Energy
Management
Control
System
Dougherty
St.
Building

 Energy
Management
Control
System
Satula
Building

 Fire
Sta3on
#
6
Roof
Replacement

 Fire
Sta3on
#2
Roof
Replacement
 Energy
Audit
Jail

 Energy
Management
Control
System
Courthouse

 Mental
Health
Building
Roof
Replacement

 Energy
Management
Control
System
Jail

 Jail
Roof
Replacement

 Purchase
40
patrol
cars
that
are
5
years
old
or
older
with
U.S.
electric
or
hybrid
cars

 Upgrade
to
digital
video
cameras
for
all
patrol
cars CAD
Upgrades Reinstate
Byrne
grant
for
local
drug
task
force
to
provide
detec3ve
jobs
and
restrict
drug
sales
and
use 27
addi3onal
police
officers
to
reduce
crime
and
expand
CID
staffing Construct
three
(3)
miles
of
sidewalks Fowler
Mill
Drive
Bridge
Deck
Replacement: The
replacement
of
the
bridge
deck
of
the
Fowler
Mill
Drive
bridge
over
Lifle
Bear
Creek
to
address
excessive
 corrosion
on
the
underside
of
the
exis3ng
steel
bridge
deck. Barnef
Shoals
Road/
Old
Lexington
Road
Intersec3on:
 The
realignment
of
Old
Lexington
Road
to
intersect
with
Barnef
Shoals
Road
at
a
tradi3onal
90‐degree
angle
 with
the
installa3on
of
a
traffic
signal. Mitchell
Bridge
Road
Widening: The
widening
of
Mitchell
Bridge
Road
between
the
Atlanta
Highway
and
Athens
West
Parkway
to
a
consistent
3‐ lane
cross
sec3on
to
allow
for
a
con3nuous
center,
two‐way
leb‐turn
lane.

Funding
Required Jobs 












150,000
 3 












160,000
 3 












200,000
 4 












175,000
 4 












250,000
 5 












240,000
 5 












300,000
 6 












300,000
 6 












300,000
 6 












300,000
 6 












350,000
 7 












340,000
 7 












350,000
 7 












350,000
 7 












450,000
 9 












500,000
 10 












500,000
 10 












510,000
 10 












550,000
 11 












700,000
 14 










1,070,000
 21 










1,150,000
 23 










1,337,000
 27 










1,500,000
 30 










1,510,000
 30 










2,400,000
 48 










3,000,000
 60 












100,000
 2 












145,000
 3 












450,000
 9 












363,000
 20 












856,000
 75 












300,000
 












113,000
 10 












115,000
 10 










1,400,000
 12 












700,000
 20 












800,000
 25 












750,000
 25 












250,000
 30 










4,900,000
 45 










4,000,000
 50 










4,000,000
 50 










4,000,000
 50 










4,000,000
 75 








16,000,000
 100 












133,000
 5 












100,000
 10 














88,000
 10 














81,000
 15 














85,000
 15 














84,000
 15 












263,000
 15 














59,000
 20 












350,000
 20 












350,000
 20 












138,000
 20 












138,000
 20 














74,000
 25 












450,000
 25 












205,000
 25 












900,000
 40 












464,000
 40 










1,175,000
 












650,000
 2 










2,000,000
 5 












500,000
 6 










1,092,691
 27 












505,000
 3














300,000


6












1,110,000


12














700,000


12

City

State

Program

Athens

GA

Streets/Roads

Athens

GA

Transit

Athens

GA

Athens Athens

Project
Descrip3on

Funding
Required

Jobs














750,000


5

Transit

Mitchell
Bridge
Road/Athens
West
Parkway
Intersec3on: The
realignment
of
the
exis3ng
three‐legged
intersec3on
to
a
four‐legged
intersec3on
with
the
newly
 constructed
street,
The
Preserve,
serving
as
the
fourth
leg
of
the
intersec3on.

Included
in
th Increase
Fix‐Route
(Bus)
Opera3ng
and
Maintenance
Funding
to
help
stabilize
fare
increases;
and
improve
 reliability,
and
increase
frequency Athens
Transit
Bus
Stop
Improvement
Program












1,000,000


15

GA

Transit

Athens
Transit
Bus
Storage
/
Parking
Area
Expansion












5,000,000


25

GA

Water

Boulevard
stormwater
project
to
alleviate
flooding
along
Boulevard
and
adjacent
proper3es














340,000


3

Athens

GA

Water














400,000


3

Athens

GA

Water














955,000


3

Athens

GA

Water














305,000


3

Athens

GA

Water

Cleveland
Avenue
stormwater
project
to
alleviate
flooding
of
Cleveland
Avenue
and
surrounding
proper3es
 (including
the
Railroad) Cobb
Street
stormwater
project
to
alleviate
flooding
throughout
the
Cobbham
neighborhood
street
network
 and
surrounding
proper3es Poplar
Street/Branch
Street
stormwater
project
to
alleviate
flooding
of
the
roadway
and
surrounding
 proper3es Dredge
Lagoon
@
Water
Treatment
Plant












1,000,000


10

Athens

GA

Water

Retrofit
Clarifiers
@
Middle
Oconee
WRF












1,000,000


10

Athens

GA

Water

Extend
Public
Water
Mains
along
public
roadways
not
currently
served
by
public
water
service

Athens Athens Athens Athens Atlanta Atlanta

GA GA GA GA GA GA

Water Water Water Water Airport CDBG

Access
Bridge
to
North
Oconee
WRF Shoal
Creek/Whit
Davis
Rd.
Sanitary
Sewer
Pump
Sta3on/Force
Main Renovate
Exis3ng
Building
for
Public
U3li3es
Customer
Service
Center Trail
Creek
#3
&
#4
Interceptor
Sewer
Project Maynard
Jackson
Interna3onal
Terminal Police
facility
improvements
for
Zone
1,
Zone
3
and
Zone
4
(plumbing,
electrical
and
other
maintenance)












2,000,000
 










4,500,000
 










5,200,000
 










2,800,000
 










2,000,000
 






500,000,000


15 20 30 40 40 5000

Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta

GA GA GA GA GA GA GA GA GA GA

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Parks
‐
Drainage
Structures Parks‐
Curbing
Installa3on Parks
‐
Driveways
and
Parking
Lots Parks
‐
Retaining
Walls
and
Slopes Parks
‐
Sidewalks
and
Pathways Tree
Canopy
Preserva3on
‐
Invasive
Removal Parks‐
Water
Line
Backflow
Preventers Historic
City
Hall
and
Annex
Repair
Projects Deten3on
Center
Repairs Develop
Swat
Pistol
Range
to
replace
trailers
used
for
training
and
upgrade
Mounted
Training
Area














185,000
 












750,000
 












750,000
 












950,000
 












980,000
 










1,050,000
 










1,500,000
 










2,475,000
 










3,400,000
 










3,800,000


2 8 8 10 10 11 15 25 34 38












3,835,700


39

Atlanta

GA

CDBG

Replace
8
Fire
Sta3ons
that
are
over
50
years
old
and
under
poor
condi3ons










24,000,000


240

Atlanta

GA

CDBG

Build
Consolidated
Mul3‐Use
Public
Safety
Training
Facility
to
meet
cri3cal
training
needs


Atlanta Atlanta Atlanta

GA GA GA

CDBG Energy Energy

Renova3on
of
25
Neighborhood
Recrea3on
Centers Install
low‐flow
plumbing
fixtures Replace
inefficient
ligh3ng
with
high‐efficiency
ligh3ng,
and
install
automa3c
ligh3ng
controls










28,000,000
 








39,500,000
 










2,107,822


280 395 21












4,117,854


29

Atlanta

GA

Energy












5,515,468


55

Atlanta

GA

Energy










12,673,636


100

Atlanta

GA

Energy










13,000,000


130

Atlanta

GA

Energy

Upgrade
building
envelopes,
including
installa3on
of
reflec3ve
of
green
roofing,
insula3on,
and
high‐ performance
windows
and
doors. HVAC
system
efficiency
upgrades,
including
replacement
of
inefficient
equipment
with
high‐performance
 systems,
installa3on
of
automa3c
controls,
and
recomissioning
of
exis3ng
systems Install
waste‐to‐energy
recovery
systems
(fuel
cells,
microturbines,
and
gasifica3on
systems)
to
convert
waste
 energy
sources
(landfill
gas,
wastewater
treatment
system
gas,
yard
waste,
and
waste
grease)
to
renewable
 electricity
for
city
government
opera3ons Install
solar
thermal
and
photovoltaic
systems










52,390,000


524

Atlanta

GA

Energy

Green
Fleet‐
hybrid
and
electric
vehicles,
biodiesel
and
biodiesel
fueling
sta3on,
fuel
cell
pilot
program

Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta

GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA GA

Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Hire
200
Police
Officers Bridge
Maintenance
and
Repairs Streetlights Traffic
Communica3ons Traffic
Signals
&
School
Flashers Hazardous
Sidewalk
Repairs Bridge
Replacement Street
Resurfacing Travel
Demand
Model
and
Engineering
for
Beltline
Transit
and
Trail 5
Miles
of
Beltline
Trail
and
Spur
Trails Streetcar
East‐West
line
‐2.27
miles,
9
sta3ons,
2
cars Streetcar
Midtown‐Downtown
line
‐
3.6
miles Hemphill
WTP
Electrical
Switchgear
Replacement Proctor
Creek
Basin
‐
East
Proctor
Capacity
Relief
Project Downtown
Elevated
Storage
Tank Automa3on
of
the
Hemphill
and
Chafahoochee
Water
Treatment
Plants Proctor
Creek
Basin
‐
Terrell
Creek
Replacement
Project Water
Tank
Pain3ng
&
Structural
Repair Year
2011
Small
Diameter
Capacity
relief
Projects
‐
Pipeburs3ng Sewer
Group
5
&
6
‐
SSES
Contract
A Sewer
Group
5
&
6
‐
SSES
Contract
B South
River
Basin
‐
East
Point
Trunk
Replacement Hemphill
Finished
Water
Pump
Sta3on Southwest
Main
Improvements
30‐inch South
River
Basin
‐
North
South
Basin
Capacity
Relief
Projects North
Area
Main
Improvements Adamsville
Transmission
Main
Improvements Fairburn
Road
Water
Mains Fairburn
Road
Water
Mains Koweta
Rd.
Water
Main
&

Pumping
Sta3on










64,000,000
 








20,000,000
 










1,800,000
 








10,200,000
 








18,000,000
 








29,400,000
 








50,000,000
 








75,000,000
 






120,000,000
 










6,000,000
 








18,000,000
 








40,000,000
 








81,000,000
 










1,270,000
 










2,800,000
 










4,215,400
 










6,600,000
 










8,700,000
 










9,112,880
 








10,500,000
 








15,000,000
 








15,000,000
 








17,800,000
 








19,400,000
 








20,700,000
 








22,315,000
 








22,522,000
 








22,926,000
 








29,937,000
 








32,000,000
 








38,061,000


550 200 18 102 180 294 500 750 1200 60 180 400 600 13 28 42 66 87 91 105 150 150 178 194 207 223 225 229 299 320 381














950,000


12

City

State

Program

Atlanta Atlanta Atlanta Atlanta Atlanta Atlanta College
Park College
Park College
Park

GA GA GA GA GA GA GA GA GA

Water Water Water Water Water Water Streets/Roads Water Water

Southwest
Main
54
inch Adamsville
Transmission
Main
Improvements Georgia
Tech/Mid3wn
Water
Main
Replacement Koweta
Rd.
Water
Main
&

P.
S. Southwest
Main
Improvements
30‐inch South
River
Capacity
Relief
Tunnel
and
Pumping
Sta3on Citywide
Asset
Inventory Water
Line
Extension‐‐
Extension
of
approx.
2000
linear
feet
of
12
inch
waterline Best
Road
Sewer
Improvements‐‐Replacement
of
approximately
2200
linear
feet
of
10
inch
sanitary
sewer.

Project
Descrip3on

College
Park College
Park College
Park College
Park

GA GA GA GA

Water Water Water Water

Various
Sewer
Improvements
of
approx.
5000
linear
feet Sanitary
Sewer
Extension‐‐Extension
of
approx.
4000
linear
feet
of
sanitary
sewer Various
Water
line
upgrades
of
approx.
5000
linear
feet REgional
Stormwater
Deten3on
Facility‐‐provide
offsite
stormwater
deten3on
for
downtown
development

College
Park

GA

Water

Various
Stormwater
Projects
of
approx.
5000
linear
feet

Conyers

GA

CDBG

Conyers

GA

CDBG

Conyers

GA

CDBG

Conyers

GA

Housing

Conyers

GA

Public
Safety

Conyers

GA

Public
Safety

To
augment
recent
expansions
the
Georgia
Interna3onal
Horse
Park
is
in
need
of
addi3onal
public
facili3es
 including
a
public
use
building
that
would
house
mee3ng
space
and
public
restrooms
in
an
area
of
the
park
 current
served
by
portable
facili3es The
Georgia
Interna3onal
Horse
Park
is
in
need
of
addi3onal
full
service
RV
spots
that
can
accommodate
the
 increase
in
the
number
of
visitors
coming
to
the
park
for
events
as
a
result
of
the
mul3‐million
dollar
expansion
 at
the
park. This
project
involves
the
construc3on
of
an
indoor
arena
with
adjacent
parking.

To
provide
an
85,000
square
 foot
arena
would
cost
an
es3mated
$35
million
dollars
and
addi3onal
adjacent
parking
would
be
an
addi3onal
 es3mated
$1
million.

The
construc This
project
involves
the
construc3on
of
approximately
70
new
public
housing
units
to
replace
units
that
are
 over
50
years
old.

This
units
currently
need
considerable
upgrading
and
re‐condi3oning.

These
70
units
would
 be
relocated
to
an
area
beside
th General
Dynamics’
ruggedized
laptops
would
be
a
great
solu3on
for
Criminal
Inves3ga3ons
Personnel
 worksta3ons.
Since
these
laptops
are
fully
ruggedized
they
can
be
taken
anywhere
in
the
field
without
fear
of
 damaging
the
computer.
 VMware
is
a
collec3on
of
sobware
that
can
be
used
for
several
infrastructure
improvements.
VMware
would
 give
us
the
ability
to
place
several
public
safety
servers
onto
two
iden3cal
servers.


Conyers

GA

Public
Safety

Conyers

GA

Streets/Roads

Conyers

GA

Streets/Roads

Hinesville Hinesville Hinesville Hinesville Hinesville Hinesville Hinesville Macon

GA GA GA GA GA GA GA GA

CDBG Housing Public
Safety Public
Safety Streets/Roads Transit Water Airport

Macon

GA

Airport

Macon

GA

Airport

Macon

GA

CDBG

Macon

GA

CDBG

Macon Macon

GA GA

Macon Macon Macon Macon

Funding
Required Jobs 








41,225,703
 412 








42,343,100
 423 








43,363,000
 434 








54,850,000
 549 








56,000,000
 560 






111,684,927
 1117 












210,000
 11 










2,500,000
 13 










3,000,000
 










3,000,000
 










4,500,000
 










3,500,000


15 21 24 30












6,000,000


33












7,500,000


40
















80,000


10














250,000


20










36,000,000


470












5,500,000


250
















40,000


3














120,000


5














220,000


6


Live
Scan
Portables

This
solu3on
could
be
used
by
Criminal
Inves3ga3ons
Unit
and
Field
Service
Units
for
the
 instant
iden3fica3on
of
suspects
in
the
field.
They
could
also
be
used
by
CID
to
fingerprint
suspects
at
the
PD
 or
in
the
field
for
the
pur This
project
would
involve
the
widening
of
a
city
street
used
as
a
primary
source
of
ingress
and
egress
to
the
 historic
downtown
area
of
Conyers.


The
construc3on
would
involve
some
widening
of
the
roadway,
sidewalks
 and
the
milling
and
paving
of
the
cu 
This
project
would
involve
the
widening
and
upgrading
of
an
integral
street
leading
into
the
historic
downtown
 area
of
Conyers.

Currently
the
road
is
substandard
in
width
and
condi3on
to
handle
the
daily
loads
of
traffic
 using
this
route
into
the
histo Azalea
Street
Redevelopment
Phase
II
&
III Hinesville
Housing
Authority Hinesville
Fire
Dept. Hinesville
Police
Dept. Memorial
Drive
Realignment Liberty
Transit Hinesville
Water
Reclama3on
Project Middle
GA
Regional
Airport:
purchase
1,500‐gal
aircrab
rescue
&
firefigh3ng
vehicle
for
commercial
aircrab
 and
Robins
AFB
backup
 Herbert
Smart
Airport:
relocate
public
roadway,
lengthen
runway
10‐28
to
5,000
b,
improve
runway
safety
 areas,
construct
parallel
taxiway Middle
GA
Regional
Airport:
filling,
grading,
drainage,
erosion
control
improvements
to
create
marketable
 industrial
property. Demolish
and
clear
backlog
of
300
blighted,
condemned
proper3es















400,000


30












1,800,000
 










5,000,000
 












700,000
 












250,000
 












400,000
 










5,000,000
 












700,000
 










2,000,000


65 75 60














800,000


2












4,800,000


42












3,800,000


125












6,000,000


25

Energy Housing

Create
20‐acre,
passive
&
ac3ve
recrea3on
complex
in
historically
unserved
neighborhood
at
former
Durr's
 Lake
property Energy‐efficient
hea3ng/ven3la3on/AC
systems
for
41
schools
(30
are
Title
1) Construct
central
laundry;
install
unvented
washer‐dryer
units
at
Vineville
Senior
Housing












5,000,000
 








15,218,310


120 194

GA GA GA GA

Housing Housing Housing Housing

Landscaping
improvements
at
Bowden,
Felton,
Anthony
Homes Replace
waterlines/main
at
Bloomfield
Way Repair
covered
storm
pipes
at
Anthony
Homes Public
housing
site
work/concrete
repairs
at
Tindall
Hts;
Bowden,
Murphey,
Pendleton,
Felton
Homes














409,000
 














50,000
 












275,000
 












150,000


10 10 10 12












1,290,000


40

Macon

GA

Housing

Construct
50
new
single‐family
in‐fill
houses
for
low‐income
families
to
support
2009
HOPE
VI
applica3on












5,000,000


50

Macon

GA

Housing

Felton
Homes
apartment
entrance
facade,
to
support
2009
HOPE
VI
applica3on












2,800,000


50

Macon

GA

Housing

Replace
windows;
replace
deteriorated
3les,
kitchen
cabinets,
and
clothesline
posts
at
Pendleton
Homes












1,450,000


50

Macon

GA

Housing

Public
housing:
Replace
shingle
roofs
at
Tindall
Hts;
McAfee
Tower;
Bowden,
Felton,
Mounts
Homes















814,000


55

Macon

GA

Housing












2,500,000


75

Macon

GA

Public
Safety












9,885,300


2

Macon

GA

Schools

Abatement,
demoli3on,
infrastructure
installa3on
for
100
new,
single‐family
replacement
units
to
support
 2009
HOPE
VI
applica3on Purchase
infrastructure
&
equipment
for
mul3‐agency,
direct
interoperable
communica3ons
to
address
gaps
in
 regional
strategic
plan
 Telecommunica3ons
and
instruc3onal
technology
upgrades
for
43
schools
(28
are
Title
1)












8,800,000


37

Macon

GA

Schools












4,057,550


52

Macon

GA

Schools










19,622,906


353

Energy‐efficient
hea3ng/ven3la3on/AC
system,
building
finishes,
access
control
for
school
administra3on
 facility Security
cameras,
security
ligh3ng,
access
control,
athle3c
facili3es/fields
at
16
schools
(11
are
Title
1)

32

City

State

Program

Project
Descrip3on

Macon

GA

Schools

Macon

GA

Transit

Retrofit
roofs;
ADA
modifica3ons;
security
cameras/ligh3ng/access
control;
building/equipment
renova3ons
at
 22
schools
(17
are
Title
1) Construct
Macon
Transit
Authority
bus
fleet
maintenance
facility
to
replace
demolished
structure

Macon

GA

Transit

Macon

GA

Water

Mariefa

GA

CDBG

Mariefa

GA

CDBG

Mariefa

GA

CDBG

Mariefa

GA

CDBG

Mariefa

GA

CDBG

Mariefa Mariefa Mariefa Mariefa Mariefa Mariefa Mariefa

GA GA GA GA GA GA GA

Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Streets/Roads

Mariefa

GA

Streets/Roads

Mariefa

GA

Streets/Roads

Mariefa

GA

Streets/Roads

Mariefa

GA

Water

Rehabilitate
Macon
Intermodal
Terminal
Sta3on
(Phase
II):
replace
rear
roof
canopy
&
HVAC;
construct
 downtown
250‐space
parking
facility. Repair/Replace
deteriorated
stormwater
drainage
system
in
historic
downtown
and
in
other
areas
with
high
 public
safety,
flood
control,
and/or
job
impact
 Charles
Avenue
Drainage
Improvements
‐
project
is
to
construct
500
feet
of
storm
pipe,
inlets
and
curb
and
 gufer
to
improve
drainage
within
an
older
residen3al
area
to
minimize
property
damage Roswell
Road
Sidewalk‐
project
is
to
construct
a
sidewalk
along
and
exis3ng
5
lane
road,
total
project
length
is
 1830
linear
feet
and
extends
pedestrian
connec3vity
to
the
downtown
business
district. Wylie
Road
Sidewalk
‐
project
is
to
construct
a
sidewalk
with
slight
road
modifica3ons
for
safety
purposes,
to
 allow
residents
along
the
corridor
to
safely
walk
to
public
transit
loca3ons.

Total
project
length
is
1050
linear
 feet Burnt
Hickory
Sidewalk
‐
2500
linear
foot
sidewalk
project
between
Whitlock
Avenue
and
Devonwood
Trail
to
 promote
pedestrian
access
and
improve
sidewalk
connec3vity
in
western
por3on
of
the
city Renaissance
District
‐
project
is
to
construct
intersec3on
improvements,
crosswalks,
sidewalks
and
gateway
 improvements
in
an
urban
renewal
por3on
of
the
downtown
area Domes3c
Violence
Response
/
Preven3on
Inves3gator Community
Outreach
Officers Community
Services
Representa3ves School
Resource
Officers Add
school‐wide
wireless
access
to
Mariefa
High
School Add
solar
panels
to
athle3c
areas
at
Mariefa
Middle
School
and
Mariefa
High
School Alexander
Street
Reconstruc3on
‐
project
includes
the
reconstruc3on
and
widening
of
550
linear
foot
of
 exis3ng
roadway
in
the
downtown
business
area Lake
Drive
and
South
Mariefa
Parkway
Intersec3on
Improvements
‐
project
includes
the
addi3on
of
a
right
 turning
lane,
intersec3on
and
drainage
improvements
to
improve
safety
at
an
exis3ng
intersec3on Kennesaw
Avenue
Bridge
‐
project
is
to
replace
an
exis3ng
bridge
with
an
42
foot
arch
culvert
and
widen
 bridge
to
accommodate
future
road
and
sidewalk
expansion
for
a
major
vehicular
and
pedestrian
corridor
into
 the
downtown
business
district Roswell
Street
‐
1,500
linear
foot
road
widening
project
between
Olive
Street
and
Fairground
Street
to
add
 capacity
and
upgraded
pedestrian
access
along
a
main
corridor
into
the
downtown
area Olley
Basin
@
Bellemeade
Sewer
Replacement

Mariefa

GA

Water

Rofenwood
Basin
@
Smithstone
Sewer
Rehab.

Mariefa

GA

Water

Sewer
System
Improvements

Mariefa

GA

Water

Water
System
Improvements
Project

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Pedestrian
Walkway:
Build
a
pedestrian
walkway
on
exis3ng
public
right‐of‐way
between
Williamson
and
W.
 River
streets
to
increase
public
safety,
reduce
blight
and
increase
economic
development Downtown
Naviga3on
System:
Implement
a
coordinated
and
visible
naviga3on
system
to
encourage
the
use
of
 parking
facili3es,
reduce
traffic
conges3on
and
engage
in
a
pedestrian
experience Children's
Museum:
Funding
to
complete
the
infrastructure
necessary
to
house
the
Savannah
Children's
 Museum
on
the
Baflefield
Park
site Fire
Department
Building
Maintenance
and
Construc3on:
Renovate
fire
training
burn
building;
repair
 infrastructure
including
overhead
doors,
paving
and
drainage
improvements;
construct
a
support
facility
to
 serve
as
a
central
equipment
storage
and
repair Stormwater
Upgrades:
Replace/
rehabilitate
deteriora3ng
brick
storm
lines
with
concrete
pipe
of
structural
 liner Visitor's
Informa3on
Center
Renova3ons
&
Maintenance:
Complete
interior
renova3ons
of
the
VIC
to
improve
 the
visitor
experience,
enhance
the
func3onality
of
the
historic
building,
improve
ADA
accessibility
and
 increase
the
direct
spending
of
visitors; Savannah
Gardens:
This
project
involves
the
City
of
Savannah
assis3ng
a
non‐profit
en3ty
in
its
redevelopment
 of
an
affordable
housing
development.
The
site
will
be
redeveloped
into
a
mixed
use,
mixed
income
 community.
This
community
will
add
to
the
inv Buildings
&
Grounds/
Public
Improvements:
Construct
a
new
center
to
serve
the
Fernwood
neighborhood;
 Upgrade
HVAC
equipment
&
roofs
in
City
facili3es;
Demolish
and
replace
pool
building
in
new
loca3on
as
per
 Daffin
Master
Plan Public
Recrea3on
Enhancements:
Install
nature
trails,
exhibit
areas,
nature
&
interpreta3on
areas;
and
 observa3on
areas
for
wildlife;
convert
exis3ng
marina
in
Coffee
Bluff
for
public
use
and
build
a
fishing
pier;
 Upgrade
sobball
complex
building City
Office
Building:
Restore
and
renovate
the
old
Waterworks
structure
into
City
office
building

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Savannah

GA

CDBG

Pennsylvania
Avenue
Corridor
Revitaliza3on:
This
corridor
has
also
experienced
disinvestment
over
the
past
 thirty
years.
This
corridor
cuts
through
the
Savannah
Gardens
projects.
The
development
of
that
project
has
 sparked
discussion
of
a
wider
revitaliz Public
Arena:
The
ci3zens
of
Savannah
voted
in
favor
of
dedica3ng
Special
Purpose
Local
Op3on
Sales
Tax
 (SPLOST)
to
the
development
of
a
public
arena.
The
SPLOST
funding
will
be
used
to
acquire
land
and
begin
the
 construc3on
design
for
the
arena.
Addi Waters
Avenue
Corridor
Revitaliza3on:
This
project
will
entail
using
various
revitaliza3on
strategies
to
improve
 a
major
corridor
within
the
city's
CDBG
Target
Area.
The
corridor
has
seen
disinvestment
over
the
past
thirty
 years.
 City
Streets
Maintenance:
Install
curbing
and
gufer
to
Edgemore
and
Sackville
subdivision
streets;
Install
ADA
 compliant/
accessible
ramps
at
loca3ons
in
the
historic
district;
Maintain
&
make
repairs
to
the
City's
bridges;
 City
Services
Complex:
Develop
newly‐acquired
Interchange
Drive
site
for
various
City
services
and
opera3ons Renova3on
and
upgrades
to
historic
Savannah
Chatham
Metropolitan
Police
Department,
201
Habersham.

 The
structure
is
139
years
old
and
listed
on
the
Na3onal
Historic
Register.

Upgrade
and
meet
Federal
 Homeland
Security
guidelines
for
Public
Safety
stru

Funding
Required

Jobs










40,349,565


562












4,000,000


50












5,000,000


136












3,007,000


276
















75,000


10














215,000


10














228,765


10














162,500


12














953,654
 














71,300
 












142,600
 












127,700
 












142,600
 












151,830
 












500,000


16 1 2 2 2 0 0














330,000


11














250,000


12














750,000


18












1,443,114


20














450,000


9














350,000


9












1,200,000


9














800,000


9














125,000


1












1,062,500


4












2,000,000


6












1,177,000


10












1,100,000


12












3,600,000


12












5,000,000


15












6,000,000


20












2,300,000


20










12,926,000


30












5,000,000


30










40,000,000


30












5,000,000


30










18,664,154


35










81,805,000


50










31,000,000


50

City

State

Program

Savannah

GA

CDBG

Project
Descrip3on

Savannah

GA

Energy

Savannah

GA

Energy

Savannah

GA

Housing

Savannah

GA

Housing

Savannah

GA

Housing

Savannah

GA

Public
Safety

Savannah

GA

Public
Safety

Savannah

GA

Public
Safety

Savannah

GA

Water

Energy
audits
and
retrofits
of
exis3ng
City
facili3es
(install
occupancy
sensors
in
conference
&
mee3ng
rooms,
 improve
flourescent
ligh3ng
efficiency,
install
more
efficient
water
using
fixtures,
install
energy
management
 controllers
on
snack
vending Hitch
Village Mold
Remedia3on
for
approximately
100
units Paferson
Terrace Central
HVAC,
Security
Screens,
New
Cabinets
&
Countertops Sustainable
Fellwood
Phase
I New
Development
of
Former
Public
Housing
Site City
Hall
Security:
Upgrade
security
(police
officers,
camera
systems,
sobware,
magnet
backup
locking
system)
 for
City
Hall
and
BMB Vehicle
Simulator:
Provide
a
facility
for
City‐wide
vehicle
simulator
training
to
reduce
spending
on
accidents
 involving
City
vehicles Narco3cs
Enforcement
with
Savannah
Chatham
Metro
Police
Department,
City
of
Savannah
which
would
 include
officers,
support
personnel,
and
equipment Air
Quality
Enhancements
to
President
Street
Plant

Savannah

GA

Water

Dean
Forest
Waterline:
Line
to
serve
potable
water
to
a
mega‐site

Savannah

GA

Water

Savannah Savannah

GA GA

Water Water

Savannah

GA

Water

Reclaimed
Water
Piping:
install
infrastructure
south
of
President
Street
Plant
to
provide
supply
to
areas
south
 of
plant Reclaimed
Water
Piping:
installa3on
of
infrastructure
from
Crossroads
Plant
to
Airport Wilshire
Plant
Decommissioning:
conversion
of
wastewater
treatment
plant
effluent
line
to
pump
sewage
to
 President
Street
Plan
and
enhance
site
to
a
public
park Alterna3ve
Biosolids
Processing
and
Disposal

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

CDBG

Hawaii
County

HI

Energy

Hawaii
County

HI

Energy

Hawaii
County

HI

Energy

Hawaii
County

HI

Energy

Hawaii
County

HI

Energy

Hawaii
County

HI

Energy

Hawaii
County

HI

Housing

Hawaii
County

HI

Public
Safety

Hawaii
County

HI

Public
Safety

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Public
Improvements
to
Savannah
River
Landing
Tax
Alloca3on
Districts
(54‐acres):
The
public
improvements
to
 be
made
within
the
TAD
include
improvements
to
the
area's
basic
water,
sewer,
and
transporta3on
 infrastructure;
roadway
improvements
&
enhanceme Implement
Biodiesel
(B20)
in
City
fleet

Public
Works
Facili3es
ADA
compliance,
island‐wide
facili3es
in
ADA
compliance
B
Priority
and
C
Priority
in
 accordance
with
county
self‐evalua3on
and
transi3on
plan
for
accessibility
to
public
facili3es
 ADA
Curb
Ramp
Compliance
Program,
Waimea.
Replace
sidewalks
and
install
curb
ramps
to
comply
with
FHWA
 seflement
agreement Hawaiian
Ocean
View
Estates
Hurricane
Shelter
and
Community
Center,
provide
hardened
shelter
and
 community
center
facili3es
to
an
economically
disadvantaged
area
with
about
5,000
residents
that
is
more
 than
30
miles
from
the
nearest
state‐approved
shelte Hawaiian
Paradise
Park
Subdivision
District
Park,
development
of
20‐acre
park
site
in
rapidly
growing
 subdivision
with
severely
underserved
recrea3onal
needs
in
an
economically
disadvantaged
area Construct
police
sta3on
in
economically
disadvantaged
Pahoa
village
next
to
new
fire
sta3on
to
centralize
 public
safety
services
in
an
area
visible
and
accessible
to
the
public. Island‐wide
accessibility
improvements
and
removal
of
architectural
barriers
for
Parks
to
meet
ADA
 requirements Puna
Gymnasium
and
ball
fields,
development
of
indoor
recrea3onal
spaces
and
outdoor
fields
for
 economically
disadvantaged
community
with
severely
underserved
recrea3onal
needs
 Construct
Makalei
Fire
Sta3on
to
improve
response
3mes
to
communi3es
currently
served
by
personnel
and
 vehicles
seven
miles
away,
reducing
fire
insurance
costs. Construct
a
new
police
sta3on
in
Captain
Cook
for
current
and
future
public
safety
needs
in
South
Kona,
 including
a
firing
range
for
police
department
training.
Property
has
been
acquired
next
to
an
exis3ng
police
 substa3on. Replace
exis3ng
street
lights
with
energy
efficient
lights
on
exis3ng
poles
island‐wide.
Island
of
Hawaii
has
 some
of
the
highest
electricity
rates
in
the
na3on. Energy
retrofits
for
county‐owned
mul3‐family
elderly
housing
projects
at
Ouli
Ekahi
in
Kawaihae
and
 Kulaimano
Elderly
Housing
in
Pepeekeo;
Island
of
Hawaii
has
some
of
the
highest
electricity
rates
in
the
na3on. DPW
Facili3es
Energy
Systems
will
build
solar
energy
systems,
high‐efficiency
equipment
replacements
and
 other
building
energy
efficiency
improvements. Install
Kealakehe
Wastewater
Plant
Photovoltaic
System
to
reduce
electrical
costs
and
reduce
reliance
on
 imported
oil Installa3on
of
solar
energy
systems
in
homes
for
very
low
income
elderly
and
disabled
homeowners;
Island
of
 Hawaii
has
some
of
the
highest
electricity
rates
in
the
na3on Provide
low‐interest
loans
to
homeowners
to
retrofit
to
increase
energy
efficiency;
Island
of
Hawaii
has
some
 of
the
highest
electricity
rates
in
the
na3on. Construct
Kaloko
Housing
Project
to
develop
24
transi3onal
units
for
the
homeless
and
72
affordable
rentals
on
 a
county‐owned
parcel;
needed
to
prepare
for
the
impending
closure
of
the
only
homeless
shelter
in
West
 Hawaii

 Upgrade
land‐mobile
radio
public
safety
communica3ons
system
and
migrate
system
to
700‐800MHz
range
to
 comply
with
FCC
mandate.
Improves
public
safety
and
emergency
response
by
adding
radio
coverage
to
areas
 of
the
island
that
are
now
without
coverage.
 Informa3on
technology
disaster
mi3ga3on
to
move
mission‐cri3cal
network
and
informa3on
infrastructure
to
 non‐hazardous
zones.
Will
ensure
voice
and
data
capabili3es
in
3mes
of
crisis. Traffic
signal
upgrades
from
Traconex
control
cabinets
to
170s,
10
signal
loca3ons
to
provide
addi3onal
 controller
capabili3es
for
signal
coordina3on
and
standby
power
during
power
interrup3ons

 Hokulia
Bypass
traffic
calming
measures,
four
new
signals
and
markings,
all
mi3ga3on
needed
due
to
par3al
 opening
of
new
bypass
road Kawailani/Pohakulani/Ainaola/Iwalani
Traffic
signal
improvements
to
install
synchronized
signals,
acquire
 property
for
highway
realignment
and
make
drainage
improvements
to
improve
vehicle
and
pedestrian
safety



 Highway
Division
Office
Extension,
addi3onal
Hilo
office
space
required
for
addi3onal
personnel
to
manage
 roadway
responsibili3es



Funding
Required

Jobs










57,597,165


55














150,000


2












1,000,000


4














690,704


5












1,139,693


8












3,100,000


21














500,000


3














320,000


4












1,829,258


31












2,000,000


10












3,000,000


12










15,000,000
 










5,400,000


20 20












1,200,000


25










40,000,000


30












4,000,000


8












1,000,000


9












6,000,000


50










10,000,000


60












4,600,000


100










10,000,000


100










15,000,000


102












9,000,000


121










18,000,000


200












1,000,000


2














900,000


20












4,000,000


30












7,000,000


30














500,000


90












1,000,000


180










18,000,000


85










89,000,000
 










1,200,000


6












1,000,000


3












2,050,000


4












2,500,000


4












1,000,000


7

City

State

Program

Hawaii
County

HI

Streets/Roads

Project
Descrip3on

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

West
Hawaii
Maintenance
Facility,
replace
exis3ng
building
in
Kealakekua
with
shops
and
offices
for
Public
 Works'
traffic
building
and
automo3ve
divisions Hamakua
Highway
Maintenance
Base
Yard
to
replace
exis3ng
metal
quonset
hut
that
no
longer
meets
safety
 codes;
needs
major
repairs;
and
is
not
on
county
property.
Replacement
would
be
built
on
county
land
and
 centralize
opera3ons Construct
the
1,400‐foot
Laaloa
Avenue
extension
from
Kuakini
Highway
to
create
a
new
mountain‐to‐ocean
 connector
road
and
add
a
new
signalized
intersec3on
to
improve
traffic
circula3on
in
the
area.

 Hina
Lani
Resurfacing;
resurface
5
miles
of
highly
deteriorated
urban
street

Hawaii
County

HI

Streets/Roads

Kaiminani
Drive
resurfacing;
resurface
6
miles
of
highly
deteriorated
highway
and
construct
10
new
drywells

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Palani
Road/Kamakaeaha

Avenue
Intersec3on
Improvements
including
addi3on
of
leb
turning
lane
to
increase
 intersec3on
capacity
and
reduce
conges3on
 Puna
Makai
Alternate
Road
EIS
for
a
high‐priority
new
road
necessary
to
meet
the
transporta3on
needs
of
a
 region
expected
to
double
in
popula3on
to
70,000
by
2030
 Lindsey
Road
Bridge
replacement
to
increase
carrying
capacity
of
bridge
in
Waimea
to
meet
current
standards


Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Streets/Roads

Hawaii
County

HI

Transit

Hawaii
County

HI

Transit

Hawaii
County

HI

Transit

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Hawaii
County

HI

Water

Honolulu

HI

CDBG

Construct
two‐lane
Ane
Keohokalole
(Mid‐Level)
highway
linking
Palani
Road
and
Kealakehe,
relieving
 conges3on
on
surrounding
roadways
and
opening
300
acres
of
state
land
up
for
development
of
affordable
 housing.
 Construct
Alii
Parkway,
a
4.5‐mile
two‐lane
highway
to
reduce
vehicular
conges3on
on
Alii
Drive,
Kuakini
 Highway
and
por3ons
of
Queen
Kaahumanu
Highway Bus
Stop
and
Shelter
project
to
construct
50
covered
bus
shelters
to
protect
bus
riders
from
the
elements
and
 encourage
public
transit
use Mass
transit
base
yard
construc3on
to
include
administra3ve
building
to
serve
the
public
and
house
staff,
 maintenance
facility
for
vehicle
repairs,
bus
wash
bay
and
refueling
sta3on Vehicle
enhancement
project,
purchase
of
30‐45
passenger
buses
and
25‐30
passenger
buses
to
expand
 transporta3on
services,
providing
easier
access
for
the
public
to
health
care,
educa3onal
ins3tu3ons,
youth
 ac3vi3es
and
work
sites Backflow
Preven3on
Compliance
to
install
water
system
backflow
preven3on
assemblies
on
67
county
Public
 Works
facili3es
to
comply
with
Department
of
Water
Supply
rules Memorial
Hospital
large
capacity
cesspool
replacement,
including
installa3on
of
pump
and
connec3on
to
 municipal
sewer Backflow
Preven3on
Compliance,
county
Parks,
to
comply
with
state
and
county
requirements
for
safety
of
 public
drinking
water Repair
of
the
unlined
Keopu
Channel
damaged
in
the
2007
earthquake
and
flood.
TIMETABLE:
Approx.
3,500
 man
day
during
a
nine‐month
period. Haao
Springs
drainage
channel
repair
and
improvements
include
repairing
damaged
concrete
lining
and
 enforcing
the
channel
slopes,
providing
concrete
lining
between
culvert
and
exis3ng
concrete
lining
and
 providing
concrete
wing
walls
at
culvert
inlet Kealakehe
Wastewater
Treatment
Plant
sludge
removal,
clearing
lagoon
treatment
system
is
needed
to
restore
 plant
to
original
design
capacity
of
5.1
MGD
and
to
accommodate
increased
waste
from
local
sep3c
tanks
 Papaikou
and
Kulaimano
Dewatering,
installa3on
of
iden3cal
and
updated
sludge
dewatering
systems
at
 wastewater
treatment
plants
 Pua
Sewage
Pump
Sta3on
replacement
of
aging
wastewater
pumps,
control
and
monitoring
systems.
Failure
of
 the
sta3on
could
result
in
a
sewage
spill
of
3
million
gallons
per
day. Waimea
Water
System
improvements;
install
5,900
feet
of
12‐inch
water
line
from
Spencer
Road
to
Opelo
 Road
to

provide
transmission
capacity
in
an
area
that
regularly
experiences
low‐pressure
condi3ons. Install
16‐inch
water
main
in
conjunc3on
with
state
widening
project
of
the
Queen
Kaahumanu
Highway;
 includes
installa3on
of
25,000
linear
feet
of
line
from
Kealakehe
Parkway
to
Keahole
Reservoir.
 Kalanianaole
Avenue
Sewer
Rehabilita3on,
Phase
2,
repairs
and
upgrade
of
interceptor
that
serves
much
of
the
 Hilo
area.
Failure
of
the
interceptor
would
cause
of
spill
of
about
2.5
MG
per
day Kealakehe
Wastewater
Aera3on
upgrade
to
allow
plant
to
accommodate
sewage
from
local
sep3c
tanks;
EPA
 has
required
sep3c
tanks
to
replace
cesspools,
adding
to
the
waste
delivered
to
the
plant

 Komohana
Heights
Large
Capacity
Cesspool
replacement;
connec3on
to
sewer
syatem
will
reduce
bacterial
 levels
within
Hilo
Bay
and
other
parts
of
the
East
Hawaii
shoreline Honokaa
Large
Capacity
Cesspool
replacement;
per
EPA
mandate,
replace
cesspool
system
serving
numerous
 public
facili3es
including
Honokaa
Public
School
complex,
state
library,
Health
Department,
Judiciary
and
 elderly
housing Palani
Road
transmission
waterline;
construct
two
concrete
reservoirs
and
12,500
feet
of
waterline
south
of
 Palani
Road
to
the
Liliuokalani
subdivision.
 Naalehu
and
Pahala
Large
Capacity
Cesspool
Replacement
,
replace
wastewater
system
serving
Kau
public
 schools,
business
districts
and
residences.

 North
Kona
Sewer
and
Reuse,
installa3on
of
resuse
infrastructure
at
the
Queen
Kaahumanu
Highway
in
 conjunc3on
with
the
state
highway
widening
project.
Will
serve
planned
development
in
the
area
and
 conserve
limited
potable
water
supplies. Queen
Liliuokalani
Large
Capacity
Cesspool
replacement,
closing
cesspool
and
connec3ng
to
Kealakehe
 Wastewater
treatment
plant
to
comply
with
EPA
mandate,
closure
deadline
6/1/10 Purchase
and
install
five
UV
disinfec3on
systems
at
Aqua3cs
Complex

Honolulu

HI

CDBG

Kahuku
Housing
Founda3on
Kahuku
Elderly
‐
Renova3on
of
61
exis3ng
affordable
rental
units
in
Kahuku.

Replacement
of
Puna
Highway
Maintenance
Warehouse,
which
is
currently
inadequate
and
no
longer
used.
 Needed
to
secure
storage
of
equipment
and
supplies.
Addi3onal
space
needed
to
address
addi3onal
roadway
 responsibili3es. South
Hilo
Highway
Baseyard
Storage
to
replace
equipment
storage
warehouse

that
had
to
be
demolished
 aber
the
roof
was
damaged
in
high
winds. South
Kohala
Baseyard
Storage
to
replace
inadequate
exis3ng
facility
and
secure
equipment
and
supplies.

Mamalahoa
Widening
from
North
Hawaii
Community
Hospital
to
MP56
to
increase
traffic
capacity
through
the
 Kamamalu
Intersec3on
and
reduce
conges3on Construct
Kamanu
Street
Extension
to
connect
Hina
Lani
Street
to
Kealakehe
Parkway
to
reduce
traffic
 conges3on
in
West
Hawaii
 Saddle
Road
resurfacing
and
reconstruc3on
of
13
miles
of
highly
deteriorated
road
from
MP
43
to
MP
56


Funding
Required

Jobs












1,000,000


7












1,000,000


7












1,000,000


7












3,500,000


14












5,000,000


15










17,000,000


20












6,000,000


20












6,000,000


20












5,000,000


20












2,000,000


24












9,000,000


26










10,000,000


30










15,000,000


45










15,000,000


54










15,000,000


125










15,000,000


133












1,200,000


40










10,000,000


50










17,000,000


75












1,000,000


6












1,000,000


7












2,000,000


12












5,000,000


20












4,000,000


24












4,000,000


30












1,600,000


30












1,800,000


30












1,100,000


40












3,750,000


50












8,000,000


50












6,000,000


50












4,000,000


50










17,500,000


200










14,000,000


200










26,350,000


250










20,050,000


250










18,500,000


250














150,000


3












1,000,000


8

City

State

Program

Honolulu

HI

CDBG

Curb/gufer/sidewalk
improvements
in
low‐moderate
income
neighborhoods

Project
Descrip3on

Funding
Required 












750,000


Jobs 20

Honolulu

HI

CDBG

Honolulu

HI

CDBG

Habitat
Leeward
Waianae
Project
‐
31
new
Self
Help
Units
for
homeownership.












4,850,000


26

Self
Help
Housing
Corpora3on
of
Hawaii
Maili
Project
‐
38
new
Self
Help
Units
for
homeownership.












3,500,000


Honolulu

HI

CDBG

46










10,000,000


60

CDBG

Catholic
Chari3es
Hawaii
Renova3on
of
Public
Service
Facility
‐
Renova3on
of
a
public
service
facility
to
house
 programs
serving
low‐moderate
income
families. Housing
Solu3ons
Inc.
Seawinds
Apartments
‐
50
new
affordable
rental
units
in
Waianae.

Honolulu

HI












2,200,000


Honolulu

92

HI

CDBG

Pacific
Housing
Assistance
Corpora3on
Villas
at
Maluohai
‐
72
new
affordable
rental
housing
units
in
Kapolei.










26,000,000


150

Honolulu

HI

CDBG

Hawaii
Housing
Development
Corpora3on
Hale
Mohalu
‐
164
new
affordable
rental
housing
units.










40,837,591


184

Honolulu

HI

CDBG

Hui
Kauhale,
Inc.
(EV
Area
H)
‐
192
new
affordable
rental
housing
units
in
Ewa.










12,390,000


220

Honolulu

HI

CDBG










61,030,061


366

Honolulu

HI

CDBG

Hawaii
Housing
Development
Corpora3on
Hale
Wai
Vista
I
&
II
‐
216
new
affordable
rental
housing
units
in
 Waianae. Mutual
Housing
Assn
of
Hawaii
Ko'Oloa'Ula
‐
308
affordable
rental
housing
units
in
Kapolei










80,750,000


368

Honolulu

HI

CDBG










96,900,000


450

Honolulu

HI

Energy

St.
Francis
Development
Corpora3on
Franciscan
Vistas
Ewa
‐
292
(149
elderly
and
143
affordable)
rental
units
 in
Ewa. Solid
Waste
to
Energy
Facility
‐
Design
Expansion












7,000,000


35

Honolulu

HI

Energy

Solid
Waste
to
Energy
Facility
‐
Pollu3on
Control
Improvements










60,000,000


100

Honolulu

HI

Public
Safety
















50,000


0

Honolulu

HI

Public
Safety

Applicant
Tracking
System:
On‐line
applicant
tracking
system
to
process
job
applicants
more
efficiently
and
 effec3vely. Community
Policing
Resource
Center:
Provide
funds
for
eight
work
sta3ons.
No
jobs
created
















28,000


0

Honolulu

HI

Public
Safety












5,000,000


0

Honolulu

HI

Public
Safety

Metropolitan
Police
Recruit
Training
Posi3ons:
Provide
funding
for
100
MPR
training
posi3ons
to
enable
the
 HPD
to
hire
addi3onal
recruits. Scien3fic
Inves3ga3on
Sec3on
Forensic
Lab
Expansion:
Provide
needed
equipment
for
the
lab
expansion.















265,000


0

Honolulu

HI

Public
Safety

Scien3fic
Inves3ga3on
Sec3on
Training:
Provide
training
for
personnel
for
required
cer3fica3ons.
















90,000


0

Honolulu

HI

Public
Safety

Generator
Improvements
at
Various
Police
Facili3es














180,000


1

Honolulu

HI

Public
Safety

Honolulu
Police
Department
Headquarters
‐
Correct
building
deficiencies.














100,000


1

Honolulu

HI

Public
Safety
















25,000


1

Honolulu

HI

Public
Safety

Kapolei
Fire
Sta3on
Emergency
Roof
Repair
‐
Remove
exisi3ng
roof
(2,100
SF)
and
install
3‐ply,
modified
 bitumen
roofing
and
new
copper
flashing. Miscellaneous
Fire
Sta3on
Repairs
at
Makiki,
Manoa
and
Makakilo
Fire
Sta3ons.
















95,000


1

Honolulu

HI

Public
Safety

Mokulele
Fire
Sta3on
Repairs
‐
Hazmat
abatement,
interior
improvements,
A/C
system
improvements.














190,000


1

Honolulu

HI

Public
Safety












4,000,000


2

Honolulu

HI

Public
Safety












5,000,000


2

Honolulu

HI

Public
Safety

Honolulu Honolulu

HI HI

Public
Safety Public
Safety












4,000,000
 












360,000


2 2










13,000,000


2

Honolulu

HI

Public
Safety

Digital
Evidence
Management
System:
Management
of
digital
audio,
photo,
and
video
evidence
is
a
core
 func3on
of
contemporary
law
enforcement.
This
includes
preserving
evidence,
managing
chain
of
custody,
 managing
a
searchable
database,
etc. Electronic
Cita3on
System:
System
would
provide
enhanced
traffic
safety;
more
efficient
cita3on
process;
 automate
checks
for
warrants,
penal
summons,
protec3ve
orders;
efficient
data
transfer
to
judiciary;
3mely
 informa3on
for
inves3gators,
etc. Enterprise
Back‐Up
System,
Disaster
Recovery
and
Con3nuity
of
Government:
Establish
an
enterprise
system
 for
the
City
and
the
Honolulu
Police
Department
including
back‐up,
disaster
recovery
and
con3nuity
of
 governement.
 Fire
Sta3on
Pavement
Improvements
at
Kahaluu,
Kaneohe,
and
Waianae. In‐Car
Video
System:
An
in‐car
video
system
for
city‐owned
patrol
sedans
would
provide
heightened
safety
for
 police
and
prisoners,
reduce
risk
exposure
to
complaints
and
civil
suits.
 Honolulu
Police
Department
Training
Facility
improvements
including
reconstruc3on
of
the
gymnasium
roof.














530,000


3

Honolulu

HI

Public
Safety










25,000,000


4

Honolulu

HI

Public
Safety














785,000


4

Honolulu

HI

Public
Safety














800,000


4

Honolulu

HI

Public
Safety














350,000


10

Honolulu

HI

Public
Safety












2,200,000


11

Honolulu

HI

Public
Safety












1,000,000


15

Honolulu

HI

Public
Safety

Computer
Forensics
laboratory:
Establish
a
full‐featured
computer
forensics
laboratory
to
support
all
manner
 of
digital
evidence
recovery
and
analysis.
 Kahuku
Fire
Sta3on
Improvements
‐Hazmat
abatement,
roof,
window
and
door
replacement
and
A/C
system
 improvements. Kahuku
Police
Sta3on
Interior
Improvements
‐
Upgrade
juvenile
deten3on
and
booking
area,
receiving
area,
 arsenal
storage,
lobby
and
new
conference
room. Police
Services
Officer:
Program
to
provide
interim
employment
for
people
interested
in
a
law
enforcement
 career.
 EMS
Headquarters
and
Communica3ons
Facility,
Young
Street
‐
Plan
and
design
facility
for
two
ambulance
 units
and
district
chief. Metropolitan
Police
Recruit
Staffing
Func3ons:
Honolulu
Police
Department
Human
Resources
Division
to
 assume
the
civil
service
tes3ng
responsibli3es. East
Kapolei
Regional
Fire
Sta3on
and
Warehouse
‐
Design
facility












1,000,000


30

Honolulu

HI

Public
Safety

Upgrade
Honolulu
First
Responder
Radio
System
to
700MHz












5,000,000


37

Honolulu

HI

Public
Safety

Harden
Honolulu
Government
Facili3es
‐
Expansion
of
Access
Controls
and
Monitoring
Systems












5,000,000


50

Honolulu

HI

Public
Safety

Broadband
Expansion
Hawaii












5,000,000


100

Honolulu

HI

Public
Safety

Upgrade
State
Drivers
Licensing
and
Motor
Vehicle
Registra3on
Systems
to
support
Real‐ID

Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu

HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI

Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Repair/Rebuild
First
Responder
Communica3ons
Facili3es Develop
311
Call
Center
for
delivery
of
Ci3zen
Centric
Services Iolani
Avenue
Retaining
Wall
‐
Replace
deteriora3ng
wall
with
new
CRM
wall. Street
Ligh3ng
Improvements Curb
Ramps
on
City
Streets Road
Improvements,
Pearl
City CIPP
Lining
of
Storm
Drains
(2009) CIPP
Lining
of
Storm
Drains
(2010) Kamokila
Boulevard
Extension Joint
Traffic
Management
Center
Site
Prepara3on Traffic
Safety
Improvements‐Various
Loca3ons Traffic
Signals
Various‐Phase
XI Computerized
Traffic
Control
System
‐
Phase
X Rehabilita3on
of
Concrete
Sidewalks
(2009) Rehabilita3on
of
Concrete
Sidewalks
(2010) Traffic
Count/Speed
Sta3ons
for
Conges3on
Management Traffic
Improvements‐Harding
Avenue
&
Dillingham
Blvd










10,000,000
 








20,000,000
 










5,000,000
 












900,000
 










2,000,000
 










2,500,000
 










3,200,000
 












500,000
 












500,000
 










1,900,000
 










2,000,000
 










2,000,000
 










2,000,000
 










2,400,000
 










1,000,000
 










1,000,000
 










2,500,000
 










2,600,000


100 200 250 5 10 12 16 20 20 23 24 24 24 29 30 30 30 31

City

State

Program

Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu

HI HI HI HI HI HI HI HI HI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Traffic
Signals
Various‐Phase
X Rehabilita3on
of
Localized
Streets
(2009) Rehabilita3on
of
Localized
Streets
(2010) Rehabilita3on/Reconstruc3on
of
Streets,
Various
Loca3ons Waipio
Point
Access
Road
Improvements Traffic
Signal
Maintenance
Facility Rehabilita3on
of
Secondary
Roads
(2009) Rehabilita3on
of
Secondary
Roads
(2010) Kalaeloa
Boulevard,
Phase
2
Widening
and
Reconstruc3on
(OR&L
R/W
to
Malakole
Street)

Project
Descrip3on

Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu

HI HI HI HI HI HI HI HI HI

Streets/Roads Transit Transit Transit Transit Transit Transit Transit Transit

Honolulu Honolulu Honolulu Honolulu Honolulu

HI HI HI HI HI

Transit Transit Transit Transit Transit

Makakilo
Extension ADA
Transit
Access
Improvements Bus
Stop
Pad
Improvements Pearl
City
Bus
Facility
‐
Bus
parking
expansion Procure
New
Intra‐Oahu
Ferry
Boat Design
and
Construct
Improvements
to
the
Alapai
Express
Bus
Terminal Expand
Pearl
City
Bus
Facility Wahiawa
Transit
Center Kalihi
Palama
Bus
Facility
Improvements
‐
replace
wash
rack
and
oil
water
separator,
repave
bus
parking
area,
 design,
construct,
and
equip
add3onal
ar3culated
bus
bays. Construct
the
Middle
Street
Intermodal
Center,
plazorm
and
intersec3on
improvements Middle
Street
Intermodal
Center
Parking
Garage Upgrade
Bus
Communica3on
System
to
Digital Honolulu
High
Capacity
Transit
Maintenance/Service
Facility Procure
Hybrid
Buses
&
Paratransit
Vehicles‐30
Hybrid
60',
20
Hybrid
40',
30
Paratransit
Vehicles

Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu Honolulu

HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI

Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Honolulu
High
Capacity
Transit
Guideway‐Phase
1 Bella
Vista
180
Reservoir
Renova3on Kahana
315
Reservoir
Repair Kalihi
Corpora3on
Yard
Vehicle
Wash
Area
Improvements Kealakaha
Drive,
Pooholua
Drive
and
Waipao
Place
8‐Inch
Mains King
Street
12‐Inch
Main Kuliouou
Line
Booster
Improvements Moanalua
405
Reservoir
No.
1
Repair University
Avenue
12‐Inch
Main,
Part
II Kaluanui
Wells
Renova3on Kamehameha
Highway
8‐Inch
Mains
(Kaneohe) Kapahulu
Water
System
Improvements,
Part
III Maunaolu
530
Open
Reservoir
Drainage
System
Improvements Pacific
Heights
Water
System
Improvements,
Part
I Palolo
405
and
Palolo
605
Reservoirs
Renova3on Piikoi
Street
Drainline
Reconnec3on Pohakupu
272
Reservoir
No.
1
Renova3on Repair
of
Waimanalo
230
and
Waimanalo
364
Reservoirs Waimalu
Wells
I
Erosion
Control
and
Drainage
Improvements Ward
Avenue
12‐Inch
and
8‐Inch
Water
Mains Kamehameha
Highway
8‐Inch
Mains
(Haleiwa) Waahila
405
Reservoir
Renova3on Fort
DeRussy
Wastewater
Pump
Sta3on Lualualei
Wastewater
Pump
Sta3on
Force
Main
‐
Design
Phase Waialae
Iki
Unit
III
Sewer
Rehab Ala
Moana
WWPS
Force
Main
Modifica3on
‐
FM
No.1
Rehab Kailua
WWTP

‐
Secondary
Clarifier
Refurbishment Kailua
WWTP
‐
Dewatering
Building
Centrifuge
Installa3on Aliamanu
WWPS
No.
1
&
2
Upgrade
and
Relief
Sewer Amelia
Street
Sewer
Relief/Rehabilita3on Central
Oahu
Wastewater
Facili3es
and
Effluent
Reuse
‐
Design Enchanted
Lake
WWPS
Upgrade Gravity
Sewer
Tunnel
Projects,
Sand
island
&
Kailua
‐
Design
Defini3on Hanawai
Circle
Sewer
Rehabilita3on Kalihi
Valley
Reconstructed
Sewer Kuliouou
Sewer
Rehabilita3on
&
WWPS
Modifica3on
‐
WWPS
Modifica3on Mililani
Wastewater
Pre‐Treatment
Facility
Headworks
Upgrade Rose
Street/Kam
IV
Road
and
Richard
Lane/Linapuni
Street
Sewer
Rehabilita3on Sewer
Manhole
And
Pipe
Rehabilita3on
At
Various
Loca3ons Sewer
Rehabilia3on
Projects
on
Oahu Waimanalo
Sewer
Rehabilita3on
 Kahanu
St,
School
St,
and
Umi
St
Sewers
Relief/Rehabilita3on Kalakaua
Ave
Sewer
Rehabilita3on Ala
Moana
Blvd
Sewer
Reconstruc3on Houghtailing
Street
Area
Sewer
Rehab Kailua
WWTP
Improvements Kailua/Kaneohe
Sewer
Manhole
and
Pipe
Rehabilita3on Kailua/Kaneohe
Sewer
Rehabilita3on
‐
Ph
1 Kailua/Kaneohe
Sewer
Rehabilita3on
‐
Ph
2 Kalaheo
Ave/
Mokapu
Road/
Aikahi
Loop
Sewer
Rehab Kaneohe
Bay
Drive
Trunk
Sewer
Reconstruc3on Kapiolani
Area
Revised
Sewer
System Wahiawa
WWTP
Influent
Pump
Sta3on
and
Equaliza3on
Facility Wilhelmina
Rise
Sewer
Rehabilita3on

Funding
Required Jobs 










4,000,000
 48 








10,000,000
 50 








10,000,000
 50 








10,000,000
 50 










5,500,000
 66 










5,820,000
 70 








20,000,000
 100 








20,000,000
 100 








30,000,000
 








70,000,000
 










2,000,000
 










2,000,000
 










6,000,000
 










3,000,000
 










6,000,000
 










6,000,000
 










8,000,000


200 840 24 24 30 36 72 72 96












9,000,000
 








22,000,000
 








30,000,000
 








30,000,000
 








45,000,000


108 264 360 360 540










45,000,000
 






202,000,000
 












750,000
 












600,000
 












350,000
 










1,100,000
 












250,000
 










1,750,000
 












750,000
 














75,000
 










2,500,000
 










2,000,000
 










2,500,000
 












225,000
 










2,200,000
 










1,400,000
 












170,000
 










2,000,000
 










1,200,000
 










1,700,000
 










2,000,000
 










3,200,000
 










2,500,000
 












350,000
 










1,000,000
 










1,050,000
 












700,000
 












600,000
 












500,000
 










1,300,000
 










2,320,000
 










3,000,000
 










2,700,000
 










3,000,000
 










1,400,000
 










3,060,000
 










2,810,000
 










2,900,000
 










1,850,000
 










2,200,000
 








15,000,000
 










2,900,000
 










3,800,000
 










4,000,000
 










8,000,000
 








10,000,000
 








10,000,000
 










5,400,000
 










6,350,000
 










7,000,000
 










6,460,000
 










8,000,000
 








11,700,000
 










6,500,000
 








16,900,000


540 2424 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 3 3 4 5 8 10 10 10 15 15 15 15 15 15 15 15 15 15 15 15 15 18 18 20 20 20 20 20 20 20 20 20 20 20

City

State

Program

Honolulu Honolulu Honolulu

HI HI HI

Water Water Water

Honouliuli
WWTP
Solids
Handling
&
Energy
Recovery
Project Kalanianaole
Highway
Sewer
System
Improvements Sewer
Condi3on
Assessment
Program;
includes
CCTV
Inspec3on
of
Sewerlines,
Assessment
and
Planning
Work

Project
Descrip3on

Honolulu Honolulu Honolulu Kauai
County Kauai
County

HI HI HI HI HI

Water Water Water CDBG CDBG

Central
Oahu
Wastewater
Facili3es
and
Effluent
Reuse Kalihi/Nuuanu
Area
Sewer
Rehabilita3on
 Waimalu
Sewer
Rehabilita3on
Ph
I CDBG
Program
Expansion,
Including
Programs
for
First‐Time
Homeowners Government
Efficiency
‐
Automated
Human
Resource
System
Acquisi3on
and
Implementa3on

Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Kauai
County Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui

HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI

CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Housing Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Water Water Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy

Maui Maui Maui Maui Maui

HI HI HI HI HI

Energy Energy Energy Energy Energy

Historic
County
Building
Restora3on
and
Renova3on Islandwide
Playground
and
Recrea3onal
Facility
Improvements Jobs
Programs
‐
Employer
Outreach
and
Labor
Pool
Expansion Kekaha
Landfill
Lateral
Expansion Parks
ADA
Access
Barrier
Removal Wailua
Golf
Course
Maintenance
Building
Reconstruc3on Outdoor
Sports
Ligh3ng
Conversion
for
Energy
Efficiency
and
Shielding Revolving
Energy
Loan
Fund
for
Small
Business Affordable
Housing
Site
Acquisi3on
and
Infrastructure
Development New
Kealia
Fire
Sta3on Aliomanu
Emergency
Road
Repair Emergency
Reinforcement
of
Opaekaa
Bridge
and
Puuopae
Bridge Islandwide
County
Road
Resurfacing
Projects Levee
Projects
‐
Emergency
I‐Wall
Repair
and
Levee
Cer3fica3ons Lydgate‐Kapaa
Bike
Path
and
Associated
Facility
(Kamalani
Pavilion)
Repair Bus
Fleet
Expansion Bus
Fleet
Replacements Kaehulua
&
Apopo
Roads
Water
Main
Replacement,
Phase
II Kilauea
School
12‐inch
Waterline
Extension
for
Fire
Protec3on Lihue
Town
Water
Main
Replacement Waimea
Canyon
Drive
Waterline
Replacement Waimea
Town
Water
Main
Replacement Waimea
Wastewater
Treatment
Plant
Expansion Wastewater
Laboratory
Renova3on Watershed
Protec3on
‐
Habitat
Protec3on Molokai
Fire
Rescue
Boat D6
Dozer
with
Truck
and
Trailer Hoolehua
Fire
Sta3on Lanai
Fire
Sta3on Hoolehua
Mini‐Pumper Hoolehua
Tanker
Apparatus Kaunakakai
Fire
Sta3on
Site
Work
and
Waterline Kaunakakai
Pumper
Apparatus Renova3on
of
Kaunoa
Senior
Center Haiku
Fire
Sta3on
‐
Waterline Malama
Family
Recovery
Center
Improvement
Project
(Demoli3on
and
Construc3on) Construc3on
of
Lanai
Senior
Center Haiku
Fire
Sta3on CML
Wind
and
Solar
Energy
Genera3on
(Purchase/Install
Equipment/Connect
Electrical) Hana
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) Lanai
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure Lanai
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) Molokai
Landfill
Solar
Energy
(Purchase/Install
Photovoltaic/Connect
Electrical) Advanced
Renewable
Energy
Training
Center
for
Renewable
Energy
Produc3on
Systems,
Distributed
 Genera3on,
Energy
Storage,
and
Grid
Integra3on Molokai
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure Solar
Energy
and
Storage
Systems
for
Fire
Sta3ons

Maui

HI

Energy

CML
Gas
to
Energy
Project

Maui

HI

Energy

Maui

HI

Energy

Maui

HI

Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui

HI HI HI HI HI HI HI HI HI HI HI HI

Funding
Required Jobs 








15,000,000
 30 








17,000,000
 30 










6,000,000
 








25,000,000
 








33,000,000
 








45,100,000
 












600,000


30 40 40 45














500,000
 










5,000,000
 










2,000,000
 












805,000
 










9,000,000
 










2,200,000
 










3,000,000
 










2,000,000
 










5,000,000
 








26,909,000
 










5,000,000
 










2,500,000
 












660,000
 










2,000,000
 










1,200,000
 










3,800,000
 










3,000,000
 










1,000,000
 










3,000,000
 












700,000
 










3,500,000
 










3,000,000
 










2,500,000
 








12,000,000
 










1,000,000
 












510,000
 












222,600
 












600,000
 










5,000,000
 










4,000,000
 












200,000
 












600,000
 










4,000,000
 












702,605
 












415,000
 










3,000,000
 












500,000
 












850,000
 










5,500,000
 












300,000
 












250,000
 










1,470,000
 












250,000
 












250,000


15 20 25 25 30 30 30 30 37 40 45 50 200 5 5 5 5 5












5,000,000
 










2,940,000
 










6,000,000
 










6,000,000
 












400,000
 










2,000,000


10 15 15 20 20












6,000,000


20












4,200,000


25

Solar
Energy
and
Storage
Systems
for
Community
Centers










12,000,000


30










18,000,000


45

Energy

Solar
and
Wind
Energy
Genera3on
and
Storage
Systems
at
County
Domes3c
Water
Facili3es,
Wastewater
 Treatment
Plants
and
Landfill
Sta3ons Integrated
Million‐Ton
Carbon
Reduc3on,
Watershed
Protec3on,
Soil
Conserva3on
and
Greening
Project

Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

Maui
Electric
Vehicle
Charging
and
Energy
Storage
Infrastructure Energy
Upgrade
and
Retrofits
of
Exis3ng
County‐Wide
Facili3es Fire
and
Public
Safety
Apparatus Civil
Defense
Alert
and
No3fica3on
System Mobile
Informa3on
Boards Kahului
Fire
Sta3on
Extension Lahaina
Fire
Sta3on
Extension Lanai
Fire
Sta3on
Extension Wailea
Fire
Sta3on
Extension County
P25
Interoperability
Emergency
Communica3on
System Kihei
Police
Sta3on Waikapu
Fire
and
Public
Safety
Emergency
Equipment
Warehouse












7,500,000
 








25,000,000
 










8,000,000
 










1,500,000
 












100,000
 












150,000
 










1,500,000
 










1,000,000
 










2,000,000
 










1,075,000
 








20,000,000
 








40,000,000
 










6,000,000


75 100 225 0 6 20 30 30 30 30 125 200 200

Solar
Energy
and
Storage
Systems
for
Police
Sta3ons Central
Maui
Landfill
3,000
Gallon
Diesel
Tanks
and
Pad Central
Maui
Landfill
Gas
Collec3on
System
Expansion,
Phase
IV Propane
Hea3ng
Replacement
with
Solar
Water
Hea3ng
Systems
for
County
Swimming
Pools

City

State

Program

Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Maui Davenport Davenport Davenport Davenport Davenport Davenport Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines

HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI HI IA IA IA IA IA IA IA IA IA IA IA IA IA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Streets/Roads Streets/Roads Transit Water Water Water Airport Airport Airport Airport Airport CDBG CDBG

Haiku
Road
Reconstruc3on Mill
Street
Retaining
Wall Polipoli
Road
Reconstruc3on Waikakoi
Bridge
Repairs Countywide
Road
Preventa3ve
Maintenance Countywide
Road
Resurfacing Kaholopo
Bridge
Replacement Market
Street
Improvements
Phase
II Repair
and
Maintenance
of
Kulanihakoi
Bridge Wailea
Roads
Reconstruc3on Molokai
Highways
Baseyard Papalaua
Bus
Stop State
Office
Building
Bus
Stop Eddie
Tam
Memorial
Gym
Bus
Stop Ohukai
Street
and
South
Kihei
Road
Bus
Stops Luana
Gardens
Bus
Stop Ka
Hale
A
Ke
Ola
Bus
Stop Expanded
Bus
Fleet
Purchase Kaahumanu
Center
Transit
Center Central
Maui
Wind
Turbine
Onsite
Energy
Genera3on Turblex
Blower
Energy
Efficiency
Project Makawao
Waterline
Improvements Waikamoi
Flume
Improvements Wailuku
Waterline
Improvements
‐
Ainaola
Place Mahinahina
WTP
Improvements County‐Wide
Injec3on
Well
Rehabilita3on Hamoa
to
Koali
(Hana)
Waterline Kamaole
WTF
Improvements
‐
High
Lib
Pumps Kihei
Waterline
(Mokulele
Hwy
to
Ohukai) Maui
Meadows
Booster
Pump
Improvements Olinda
WTF
‐
8.5
Mg
Reservoir
Relining Replacement
of
Return
Ac3vated
Sludge
Header Replacement
of
Supervisory
Control
and
Data
Acquisi3on
System Wailuku
Waterline
Improvements
‐
Vineyard
Street Wailuku‐Kahului
WWRF
Concrete
Restora3on Wailuku‐Kahului
WWRF
Mixed
Liquor
Channel
Repair Water
Conserva3on
Retrofit
Program Lahaina
No.
3
Force
Main
Replacement Replacement
of
Underground
Sewer
Laterals Replacement
of
Underground
Sewer
Main
Trunk
Lines Construct
Tsunami
Protec3on
for
Exis3ng
Treatment
Plant
Facility Replacement
of
Exis3ng
Underground
Force
Main
(Kaa) Replacement
of
Exis3ng
Underground
Force
Main
(Kaanapali/Hyaf) Expansion
of
North
Kihei
Recycled
Water
Distribu3on
System Rehabilita3on/Replacement
of
Underground
Sewer
Systems Rehabilita3on/Replacement
of
Exis3ng
Pump
Sta3ons Construc3on
of
Recycled
Water
Tank
and
Associated
Distribu3on
Infrastruture Alley
Reconsrtuc3on ADA
Sidewalk
Ramps Transit
Garage Lagoon
Restora3on Urban
Waterfront
Floodplain
Management
Demonstra3on
Project Davenport
Sewer
Projects,
Including
West
Diversion
Tunnel Access
Control
Field
Equipment
Purchase/Installa3on Wetlands
Mi3ga3on Terminal
Modifica3ons
for
EDS
Deployment Consolidated
Rental
Car
Service
Facility Terminal
Concourse
Enhancements New
Sidewalks Parks
Improvements
to
playgrounds,
basketball
courts,
tennis
courts,
skate
parks
&
shelters

Project
Descrip3on

Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines

IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA

CDBG CDBG Energy Energy Energy Energy Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools

Recrea3on
Trails Franklin
Library
Renova3on
and
Expansion Retrofit
Parking
Garages
with
LED
ligh3ng
and
Mo3on
Sensors. Energy
Conserva3on
Program Citywide
interconnec3on
of
all
Traffic
Lights. Expand
Trail
System
to
provide
alterna3ve
transporta3on
op3ons. LEED
Cer3fied
Construc3on
of
Fire
Sta3on
1 Grandview
Golf
Course
Clubhouse
built
to
LEED
standards Communica3ons
Interoperability
Efforts HLS
Support
Equipment
‐
EOD/WMD/CBRNE Mobile
Data
System
Enhancements Automated
Field
Repor3ng
System Forensic
DNA
Laboratory Fugi3ve
Task
Force HLS
Response
Team Intelligence
Driven
Street
Crimes
Unit Narco3cs
Complaint
Response
Team Installa3on
of
security
cameras
and
electronic
card
keys
on
all
DMPS
buildings

Funding
Required Jobs 












600,000
 15 












500,000
 15 










1,600,000
 15 










2,000,000
 20 










2,000,000
 25 










8,000,000
 25 










3,000,000
 25 










4,000,000
 30 












100,000
 30 










1,750,000
 30 










8,000,000
 75 














10,200
 2 














10,000
 2 














16,250
 4 














37,500
 8 














45,000
 10 














57,900
 12 










5,000,000
 85 












716,850
 162 












200,000
 10 










1,300,000
 10 










1,100,000
 12 










1,500,000
 12 










1,134,000
 12 












350,000
 15 










6,000,000
 20 










8,000,000
 20 










3,000,000
 20 










1,000,000
 20 










1,500,000
 20 










1,000,000
 20 












300,000
 20 












500,000
 20 










2,000,000
 20 










1,500,000
 20 










1,000,000
 20 










1,208,850
 25 










7,560,000
 30 












800,000
 30 












800,000
 30 










7,000,000
 35 










2,000,000
 35 










1,750,000
 35 










5,000,000
 40 










4,000,000
 50 










8,000,000
 55 










3,125,000
 60 










2,900,000
 29 










5,200,000
 56 










5,100,000
 55 












650,000
 7 










9,200,000
 99 








56,100,000
 606 












800,080
 10 










1,300,000
 25 










6,200,000
 30 










6,000,000
 40 










3,500,000
 40 










1,200,000
 6 










1,000,000
 










2,000,000
 










6,100,000
 










1,000,000
 












100,000
 












500,000
 










1,300,000
 










8,000,000
 










1,300,000
 










1,500,000
 










1,800,000
 










1,000,000
 












650,000
 










2,100,000
 










1,200,000
 










1,200,000
 










1,200,000
 










1,200,000
 










1,580,000


6 6 71 5 6 25 25 40 50 0 0 0 1 3 9 9 9 9 10

City

State

Program

Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Des
Moines Arco Arco Arco Arco Arco Arimo Arimo Arimo Arimo Ashton Ashton Ashton Ashton Bancrob Bancrob Bancrob Bancrob Bancrob Bancrob Bellevue Bellevue Bellevue Bellevue Bellevue Bellevue Bellevue Blackfoot Blackfoot Bloomington Bloomington Bloomington Bloomington Boise Buhl Buhl Buhl Buhl Buhl Buhl Burley Burley

IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA IA ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG Streets/Roads Streets/Roads Streets/Roads CDBG Streets/Roads Streets/Roads Streets/Roads CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Airport Water CDBG Streets/Roads Streets/Roads Streets/Roads Energy Water Water Water Water Water Water CDBG CDBG

Burley

ID

Streets/Roads

Metronet
Shared
Fiber
Op3c
Wide
Network Wireless
LAN
in
all
DMPS
school
buildings Curb
&
Median
Replacement McKinley
Avenue
Widening
from
South
Union
to
S.E.
5th Pleasant
Drive
Bridge
over
Cummins
Creek Riverpoint
West
Street
Improvements,
non‐rise
por3on Street
Resurfacing East
Army
Post
Road
Trunk Flow
Monitoring Lining
Sanitary
Trunk
and
Laterals Lifle
Four
Mile
Trunk Lower
Union
Park
Sewer
Separa3on Riverpoint
Trunk
Separa3on Southeast
Ridge
Trunk Southern
Tier
Pump
Sta3on
Improvements Southwest
Area
Diversion
Facility,
Phase
22,
Segment
3 Southwest
Area
Diversion
Facility,
Phase
22,
Segment
7 Twelbh
Street
Sewer
Separa3on West
Des
Moines
Ouzall,
Phase
13,
Segment
5 West
Des
Moines
Ouzall,
Phase
13,
Segment
6 Water
and
Temple
Steet
Enhancement
Beau3fica3on Replace
2
Failed
Bridges Construct
a
4
maile
bike
path Construct/Reconstruct
12
miles
of
Sidewatlk Reconstruct
6
miles
of
failed
roadway Street
Light
enhancement Construct
/Reconstruct
6
mikes
of
sidewalk Construct
a
4
mile
bike
Path Reconstruct
3
miles
of
failed
roadway Main
Street
and
9th
street
Enhancement/beau3fica3on Construct/Recunstruct
6
miles
of
Sidewalk Construct
a
5
mile
Bike
Path Reconstruct
3
miles
of
failed
roadway Main
street
and
canal
street
beau3fica3on Main
Street
Bridge
Reconstruc3on Construct
Reconstruct
8
miles
of
sidewalk Consturct
a
4
mile
Bike
Path Reconstruct
3
miles
of
failed
roadway Reconstruct
4
miles
of
failed
roadway 4
crosswalk
enhansements Broadford
Road
reconstruc3on Elm
Stree
reconstruc3on Pine
Street
reconstruc3on 3
miles
of
4"
water
line
replacement Muldoon
water
line
replacement water
meter
for
water
conserva3on Air
Port Water
Storage Street
Light
Enhancement
Program Construct/
Reconstruct
6
miles
of
sidewalk Construct
a
4
mile Reconstruct
3
miles
of
failed
roadway BSU
Geothermal
Loop
Expansion Water
Storage
Tank 1
million
gallon
portable
water
storage
tank Water
Treatment
Plant Water
Distribu3on
Upgrade Water
distribu3on
line
upgrades Culinary
water
treatment
plant
for
arsenic
removal
(5.3
million
gallons
per
day) Landscaping
the
medians
of
the
North
Overland
Project. Sidewalk
improvements
to
7
loca3ons
varying
from
580
b
to
3400
b.

Needed
to
improve
"Safe
Routes
to
 Schools". 5th
Street
Roadway
Extension
from
WWPT
to
IWTP

Project
Descrip3on

Burley

ID

Streets/Roads

Piping
the
irriga3on
drain
ditch
on
the
West
Side
for
widening
of
Overland
from
7th
Street
to
Burger
King

Burley Burley Burley Burley Burley Burley Burley Burley Burley Burley Burley Burley Burley Burley

ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water

Walmart
Exit
Roadway
to
North
3rd
Street North
4th
Street
West
Improvements Extend
storm
sewer
on
North
5th
Street
from
Overland
Avenue
to
Miller
Avenue Washington
Avenue
Truck
Route Commercial
Tire
Sewer
Extension Almo
and
27th
Street
Sanitary
Sewer
Upgrade Burley
West
Side
Sewer
Lib
Sta3on Burley
Industrial
Park
Well
Replacement North
Overland
Water
System
Improvements Park
Avenue
Sanitary
Sewer
from
16th
to
the
Park
Place
Subdivision Gravity
Sanitary
Sewer
from
5th
and
Miller
to
Lib
Sta3on
at
7th
and
North
Overland Washington
Avenue
Sanitary
Sewer
from
120
South
to
170
South Hiland
Avenue
Sanitary
Sewer
from
22nd
to
the
Sandy
Glen
Subdivision Dutchman
Water
System

Funding
Required Jobs 












215,000
 10 










2,370,000
 10 












750,000
 20 










1,400,000
 25 












700,000
 25 










1,500,000
 25 










2,000,000
 30 










1,500,000
 25 










6,000,000
 25 










3,000,000
 25 










1,500,000
 25 










5,000,000
 25 










2,500,000
 25 










2,000,000
 25 










5,000,000
 25 










8,000,000
 25 












750,000
 25 










1,000,000
 25 










1,750,000
 25 










6,000,000
 25 












350,000
 4 












400,000
 4 












600,000
 6 












720,000
 7 










3,600,000
 36 












150,000
 2 












360,000
 4 












600,000
 6 










1,800,000
 18 












250,000
 3 












360,000
 4 












750,000
 8 










1,800,000
 18 












200,000
 2 












500,000
 5 












480,000
 5 












600,000
 6 








18,000,000
 18 










2,400,000
 24 












400,000
 10 










1,500,000
 10 










1,500,000
 12 










2,500,000
 14 










3,500,000
 10 










2,800,000
 14 










1,900,000
 25 










2,500,000
 50 










4,000,000
 80 












150,000
 2 












360,000
 4 












600,000
 6 










1,800,000
 18 










3,000,000
 20 










2,000,000
 10 










1,500,000
 15 










3,000,000
 15 










4,000,000
 20 










2,500,000
 25 










3,000,000
 30 












108,000
 11 












526,750


53














660,000


8














119,000
 












128,000
 












146,000
 












197,000
 










2,057,000
 














86,000
 












106,000
 












120,000
 












231,000
 












275,000
 












356,000
 












410,000
 












660,000
 












858,000
 












924,000


12 13 15 20 206 9 11 12 23 28 36 41 66 86 92

City

State

Program

Burley Burley

ID ID

Water Water

Project
Descrip3on

Council Crouch Crouch Crouch Crouch Dayton Dayton Dayton Dayton Dayton Dayton Dayton Encampment Firth Firth Firth Garden
City Garden
City Garden
City Garden
City Garden
City Garden
City Garden
City Garden
City Garden
City Garden
City George
Town George
Town George
Town George
Town Glenns
Ferry

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Energy Housing Schools Water Water CDBG Streets/Roads Streets/Roads Streets/Roads Water Water Water Water CDBG Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water CDBG Streets/Roads Streets/Roads Streets/Roads CDBG

Glenns
Ferry Glenns
Ferry Glenns
Ferry

ID ID ID

Schools Schools Schools

Glenns
Ferry

ID

Schools

Glenns
Ferry Glenns
Ferry Glenns
Ferry Glenns
Ferry Glenns
Ferry Glenns
Ferry Glenns
Ferry

ID ID ID ID ID ID ID

Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water

Glenns
Ferry

ID

Water

Grace Grace Grace Grace Grace Hansen

ID ID ID ID ID ID

CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG

Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen Hansen

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Schools Schools Schools Schools Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Hansen

ID

Streets/Roads

Insula3ng
wall
west
side
of
gym. Update
ligh3ng
in
the
elementary
school. Install
hardwood
floor
elementary
gym. Install
security
system
in
elementary
school. Insula3ng
ceiling
panel
of
gym. Update
technology
overhead
project. Install
gym
floor
in
main
gym. Update
computer
lab
in
elementary
school. Update
hea3ng
system
in
elementary
school. Re‐roof
Elementary
School
with
Steel Rock
Creek
Road
Mul3‐Use
Path School
Safety
Crossing US‐30/Main
Street
Intersec3on
Improvements US‐30/Rock
Creek
Road
Intersec3on
Safety
Improvements. Main
Street
Extension
from
Pine
Avenue
to
US‐30. Rock
Creek
Road
Railroad
Safety
Crossing Main
Street
Enhancement
for
four
blocks
from
Railroad
Avenue
to
Poplar
Avenue.

Sidewalk
and
drainage
 control. Hansen
Estates
Subdivision
Interior
Road
Reconstruc3on

Hansen

ID

Streets/Roads

Main
Street
Improvements
from
US‐30
to
Railroad
Avenue,
including
railroad
safety
crossing.

Hansen

ID

Water

Wastewater
Collec3on
Rehabilita3on
for
high
priority
areas
throughout
town.

Priority
1
Water
System
Upgrades
from
2004
Master
Plan Burley
WWTP
compliance
with
EPA
for
collec3on,
process,
nutrient
removal,
and
reuse
of
plant
effluent
for
 two
treatment
plants. Council
Central
Biomass
Heat
Facility Crouch
Affordable
Housing
Project Garden
Valley
School
District
Biomass
Heat
system Crouch
Central
Water
District Regional
Wastewater
Treatment
System
for
Crouch
and
Garden
Valley 4900
W
800
North
and
5
mile
Road
Enhancement Cosntruct/Reconstruct
6
mikes
of
sidewalk Construct
a
4.5
Mile
bike
Path Reconstruct
3
miles
of
failed
roadway Develop
New
Wells Development
New
Well Water
Impovement
Distrubu3on Wastewater
Collec3on
Improvements Center
Street
Lincoln
Street
and
Roosevelt
Enhar Construct/Reconstruct
12
miles
of
Sidewalk Reconstruct
5
miles
of
failed
roadway Relocate
Shenandoah
Lib
Sta3on Standby
power
for
water
supply Reconstruct
Duck
Lake
Lib
Sta3on Rehabilitate
Exis3ng
Wells Develop
New
Wells Rehabilitate
Ruby
Lib
Sta3on Construct
Water
Stroage
Tank Replace
Undersized
Pipe
to
improve
Fire
Flow Replace
failed
collec3on
piping Construct
Wastewater
Treatment
Plant Street
Ligth
Enhancement
Program Construct/Reconstruct
12
miles
of
Sidewalk Construct
a
4
mile
Bike
Path Reconstruct
3
miles
of
failed
roadway Downtown
Economic
Revitaliza3on/Beau3fica3on
of
8
blocks.

Install
new
sidewalk
and
replace
old.

Curb
and
 gufer
where
needed.

Street
ligh3ng
for
safety
and
enhancement. Elementary
Playground
installa3on
of
outdoor
basketball/hard
surface
facili3es. Elementary
Playground
installa3on
of
safety
3les
safety
surface
on
4
play
areas. Elementary
Playground
purchase
and
installa3on
of
new
playground
equipment
for
both
upper
elementary
 and
lower
elementary. Elementary
Playground
removal
of
asphalt,
site
work,
and
installa3on
of
irriga3on
system Build
two
new
classrooms
on
facility. Remodel
Agricultural
Science
and
Technology
and
Industrial
Technology
Facili3es. Safe
Routes
to
School/Pathway
network
for
children,
including
railroad
underpass. 4th
Avenue
Bridge
Replacement.

Safety
concern,
sufficiency
ra3ng
32.5. Local
Street
Improvements. Madison
Avenue
Replacement
and
Economic
Revitaliza3on. Waterline
replacements
of
old,
deteriorated
pipelines
to
improve
fire
protec3on,
pressures,
and
reliability.

 Installa3on
of
fire
hydrants
and
water
meters. Groundwater
conserva3on
and
economic
revitaliza3on
project
expanding
the
irriga3on
system
usage
in
town
 in
lieu
of
potable
water. Center
Street
Beau3fica3on Center
Street
Bridge
Reconstruct Construct/Reconstruct
8
mikes
of
sidewalk Conatruct
a
4
mile
bike
path Reconstruct
4
miles
of
failed
roadway US‐30
Downtown
Revitaliza3on/Beau3fica3on
of
5
blocks.

Sidewalk,
curb,
gufer,
and
ligh3ng.

Funding
Required 










1,400,500


Jobs 140










15,000,000
 










4,000,000
 










3,200,000
 










3,000,000
 










2,000,000
 










3,500,000
 












200,000
 












360,000
 












675,000
 










1,800,000
 










1,000,000
 












500,000
 










5,000,000
 










3,000,000
 












350,000
 












600,000
 










3,000,000
 












320,000
 












386,000
 












600,000
 












736,000
 










1,717,000
 












480,000
 










2,600,000
 










7,475,000
 










8,000,000
 








30,000,000
 












150,000
 












360,000
 












600,000
 










1,800,000


1500 400 200 10 50 50 2 4 7 18 5 5 25 15 4 6 30 2 2 3 4 8 12 13 36 40 150 2 4 6 18












1,800,000
 














55,000
 














55,000


180 5 5
















88,000


9














100,000
 












550,000
 










1,100,000
 












450,000
 












850,000
 










1,000,000
 










1,500,000


10 55 110 45 85 100 150












1,600,000


160












2,500,000
 












200,000
 












250,000
 












480,000
 












600,000
 










2,400,000


250 2 3 5 6 24












2,800,000
 














11,000
 














15,000
 














28,000
 














12,000
 














18,000
 














21,000
 














38,000
 














33,000
 














27,000
 














63,000
 












250,000
 














26,000
 












450,000
 












480,000
 












560,000
 












800,000


280 2 2 3 3 3 3 4 5 6 7 25 26 45 48 56 80














850,000


85














980,000


98












1,300,000


130














600,000


60

City

State

Program

Hansen

ID

Water

Wastewater
Collec3on
Replacement
for
Hansen
Estates
subdivision
of
old
deteriora3ng
concrete
pipeline.

Project
Descrip3on

Funding
Required 












720,000


Jobs 72

Hansen

ID

Water

Hansen

ID

Water

Idaho
City Idaho
City Idaho
City Idaho
City Idaho
City Idaho
City Idaho
City Idaho
City Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Idaho
Falls Jerome Jerome Jerome

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

CDBG CDBG Energy Schools Schools Streets/Roads Streets/Roads Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Water Water Schools Streets/Roads Streets/Roads

Jerome

ID

Streets/Roads

Priority
1
and
2
Water
System
Improvements
per
January
2003
Water
System
Master
Plan.

Fire
protec3on
‐
 distribu3on
system
improvements,
new
well
connec3ons,
new
storage
tank,
SCADA
system,
install
water
 meters,
and
loop
dead
end
distribu3on
mains. Wastewater
Treatment
Improvements
per
pending
Wastewater
Facility
Planning
Study.

New
headworks,
 aera3on
equipment,
clarifier,
and
disinfec3on.

Out
of
compliance
with
DEQ
discharge
permit. Idaho
City
Wastewater
Expansion
to
Warm
Springs
Resort Idaho
City
Business
Incubator
and
Park Idaho
City
Woody
Biomass
Co‐Genera3on
Plant Basin
School
District
Biomass
Heat
System Basin
School
District
Facili3es
Expansion Idaho
City
Main
Street
Reconstruc3on Idaho
City
Montgomery
Street
Reconstruc3on Idaho
City
Water
System
Improvements Bridge
at
25th
&
Emerson
over
Gustafson
Lateral
Canal Bridge
at
Kinswood
over
Idaho
Canal Concrete
Sidewalk
&
Curb/Gufer
Replacement
‐
Citywide ADA
Concrete
Sidewalk
Ramp
Replacement
‐
Citywide Pedestrian
Pathway
‐

S
Tourist
Park
to
Sunnyside
Road 17th
Street
‐
Aus3n
Ave
to
Hif
Rd
(Mill
&
Inlay) 17th
Street
‐
Holmes
Ave
to
Aus3n
Ave
(Mill
&
Inlay) 17th
Street
‐
Pancheri
Bridge
to
Holmes
Ave
(Mill
&
Inlay) Woodruff
Ave
‐
Caribou
St
to
Meppen
Canal
(Pave.
Reconstruct) Citywide
Seal
Coat Hif
Road
Reconstruc3on
‐
Meppen
Canal
to
Mesa
Street Security
Upgrades
at
Exis3ng
Well
Sites AB
Sanitary
Sewer
Lib
Sta3on
Upgrade Waste
Water
Treatment
Plant
Parking
Lot
Paving Church
Farm
Storm
Water
Lib
Sta3on
Replacement Emergency
Genera3on
Installa3on
at
2
Exis3ng
Well
Sites Mill
Run
Storm
Water
Lib
Sta3on
Replacement New
Fire
Supply
Wells
(2) St.
Clair
Storm
Water
Lib
Sta3on
Upgrade Water
Line
Rehabilita3on Water
Line
Replacement Alley
Sanitary
Sewer
Line
Replacement
Between
7th
St
&
8th
St S
Trunk
Water
and
Sewer
Line
Installa3on
between
Well
18
and
Holmes
Ave Sanitary
Sewer
Line
Rehabilita3on Waste
Water
Treatment
Plant
Gravity
Belt
Thickening Jerome
High
School
upgrade/expansion
to
facili3es. 200
South
East
from
Lincoln
Avenue
RR
tracks
needs
to
be
rebuilt. Nez
Perce
Ave
(100
S
East
and
West
of
Lincoln).

Approximately
½
mile
improvement
requires
full
reconstruct
 to
accommodate
heavy
trucks 100
East
Tiger
Drive
and
Main
Hwy25
intersec3on
improvment
(traffic
light
warranted)
as
cri3cal.












3,500,000


350












6,500,000
 










1,000,000
 










5,000,000
 








30,000,000
 










3,000,000
 










3,000,000
 










2,000,000
 










2,000,000
 










5,000,000
 












100,000
 












150,000
 












500,000
 












500,000
 












400,000
 










1,700,000
 










2,000,000
 










2,200,000
 












900,000
 










1,000,000
 










6,000,000
 












200,000
 












500,000
 












200,000
 












800,000
 












700,000
 












200,000
 












600,000
 












200,000
 










2,000,000
 










2,000,000
 










1,000,000
 










1,750,000
 










2,000,000
 










8,000,000
 










1,500,000
 












300,000


650 100 500 3000 300 300 200 200 500 5 5 5 6 8 12 12 12 14 16 20 5 6 8 10 10 10 10 10 10 10 14 15 15 30 150 30














450,000


45














500,000
 












500,000


Jerome Jerome

ID ID

Streets/Roads Streets/Roads

Jerome Jerome Jerome Jerome Kellog Ketchum Ketchum

ID ID ID ID ID ID ID

Streets/Roads Water Water Water Energy CDBG CDBG

10th
Ave
and
N.
Lincoln
Ave.
Intersec3on
Improvements
(Traffic
Light
Warranted). 16th
Ave
West
(100
North
from
Lincoln
to
100
West)
and
100
West
to
Main
St.

Approximately
2
miles
of
full
 road
reconstruc3on. ITD
widening
of
Hwy
93
from
I
84
to
Hwy
25. Upgrade,
replace
and
repair
irriga3on
lines
and
install
pipes
in
place
of
open
ditches. Upgrade,
replace
and
repair
irriga3on
lines
and
install
pipes
in
place
of
open
ditches. Upgrade,
replace
and
repair
sewer
conveyance
system. Shoshone
County
Woody
Biomass
Cogenera3on
Facility Ketchum
Wi‐Fi.
Expand
wireless
internet
within
the
City Walnut
Ave
Streetscape‐
New
sidewalks
on
west
side
of
Walnut
between
4th
and
5th
Street.

50 50












1,500,000
 








20,000,000
 










1,500,000
 










2,500,000
 










2,500,000
 








30,000,000
 














36,000


150 2000 150 250 250 200 4

Ketchum Ketchum

ID ID

CDBG CDBG

Ketchum
Reuse
Water
Pipeline‐
New
reuse
waterline
for
irriga3on
of
reclaimed
water. Community
Core
Streetscape
Phase
2‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping.














200,000
 












500,000


20 50

Ketchum

ID

CDBG

Community
Core
Streetscape
Phase
3‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping.














750,000


75














750,000


Ketchum

ID

CDBG

Community
Core
Streetscape
Phase
I‐
Infill
sidewalks,
pedes3an
ligh3ng,
and
landscaping.














750,000


75 75

Ketchum

ID

CDBG

New
Well
Near
Griffen
Bufe
Rural
Fire
Sta3on‐
New
well
to
add
redundancy
to
the
water
system.












1,000,000


100

Ketchum

ID

CDBG












2,000,000


200

Ketchum

ID

CDBG

Ketchum

ID

CDBG

Ketchum
4th
Street
Phase
III‐
Downtown
Revitaliza3on
of
3
blocks
including
sidewalks,
Roadway,
Ligh3ng
and
 Landscaping. 1st
Avenue
Promenade‐
Downtown
Revitaliza3on
of
4
blocks
including
sidewalks,
Roadway,
Ligh3ng
and
 Landscaping. Town
Plaza‐
Consturc3on
of
City
Hall,
underground
parking
garage,
and
town
plaza.

Ketchum

ID

CDBG

Ketchum

ID

Energy

Ketchum Ketchum Ketchum Lava
Hot
Spring Lava
Hot
Spring Lava
Hot
Spring Lava
Hot
Spring Lava
Hot
Spring lewiston lewiston

ID ID ID ID ID ID ID ID ID ID

Streets/Roads Streets/Roads Streets/Roads CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads CDBG CDBG












3,000,000


300










25,000,000


2500

Community
Core
Streetscaping
Phase
4‐
Infill
sidewalks,
pedestrian
ligh3ng,
and
landscaping.










59,000,000


5900

Guyer
Hot
Springs
Geothermal
Heat
Source.

U3liza3on
of
the
exis3ng
hot
springs
as
a
heat
source
to
heat
 homes
and
businesses. Public
Transporta3on
New
Bus
Shelters
(12) Public
Transporta3on
New
Busses
(6) Public
Transporta3on
Park
&
Ride
Facility
including
bus
garage,
storage,
and
wash
bay. Main
Street
and
Center
Street
Beau3fica3on Construct/Reconstruct
6
miles
of
sidewalk Construct
a
4.5
Mile
Bike
Path Main
Street
Bridge
Reconstuct Reconstruct
3
Miles
of
failed
Roadway 5th
street
marina
and
dock skate
park












8,000,000
 














60,000
 










1,500,000
 










3,000,000
 












200,000
 












360,000
 












675,000
 












800,000
 










1,800,000
 










1,000,000
 












500,000


800 10 150 300 2 4 7 8 18

City

State

Program

lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston lewiston Lewiston
 Lewiston
 Lewiston
 Lewiston
 Lewiston
 Lewiston
 Malad Malad Malad Malad Meridian

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

CDBG CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Airport CDBG Public
Safety Streets/Roads Transit Water CDBG Streets/Roads Streets/Roads Streets/Roads CDBG

Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian

ID ID ID ID ID ID ID ID ID ID ID ID

CDBG CDBG Energy Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water

Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian Meridian

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water

Project
Descrip3on twin
ci3es
food
acquisi3on
&
site
clearance orchards
neighborhood
park book
mobile public
library public
works
maintenance
facility municipal
solid
waste
compost
facility normal
hill
parking
garage upgrade
EOC,
police
training
center
&
communica3ons fire
sta3on
and
public
safety
training
facility remodel
3
fire
sta3ons 17th
street
safety
project Bryden
Avenue
widening Community
park
traffic
mi3ga3ons Highway
12
reloca3on Highway
128
realignment Lewiston
partnership
project,
road
and
u3li3es
throughout
site Main
Steet
rebuild Port
subdivision Powers
Avenue
roundabout sidewalks
to
link
schools
and
neighborhoods Snake
River
roundabout Snake
River
widening Southway
bridge
deck Twelbh
Avenue
extension airport
east
end
water,
ww
ext. golfcourse,
airport
water
line
ext. raw
water
pump
intake sewer
plant
upgrades
for
federal
requirements,
reliability storm
sewers
downtown
to
prevent
flooding,
meet
npdes waterline
replacement
downtown Community
park
sewer airport
parking
lot
expansion Community
park
grading,
site
prep Radio
repeater,
all
weather
access Park
Avenue
extension Transit
Maintenance/Parking
Garage
 Southport
water
main
ext. Bannock
Steet
Enhancement/Beau3fica3on Construct/Reconstruct
10
miles
of
Sidewalk Construct
a
5.7
mile
bike
path Reconstruct
5
miles
of
failed
roadway Black
Cat
Lib
Sta3on
Grinder
Pumps
(placed
aber
bar
racks
to
increase
life
and
improve
opera3on
of
lib
 sta3on) Moshers/Merrywood
Sewer
Trunk
(trunk
to
abandon
three
lib
sta3ons) Ashford
Greens
Sewer
Trunk
(trunk
to
serve
north
Meridian
and
abandon
lib
sta3on) Purchase
of
Hybrid
Fleet
Vehicles Digester
Gas
Condi3oning
/
reuse Phosphorous
recovery/centrate
treatment Compos3ng
Project Intersec3on
of
Eagle
Road
and
Victory
Road Intersec3on
of
Pine
Avenue
and
Linder
Road Eagle
Road
from
Victory
to
Ridenbaugh
Canal Ten
Mile
Road
from
Cherry
Lane
to
Us3ck Ten
Mile
Road
from
Franklin
to
Cherry
Lane Land
Purchase
(for
projects
such
as
flow
equaliza3on
and
constructed
treatment
of
wetlands) Project
Management
(a
City
Employee
to
manage
the
projects) Ultraviolet
Disinfec3on
Upgrades
(addi3onal
disinfec3on
at
the
plant) WWTP
Black
Cat
Box
Odor
Control
(odor
control
at
one
of
the
influent
structures) Coagula3on
Building
for
Chemical
Feed
(chemical
feed
building
for
the
plant) WWTP
Digester
Grinder
Pumps
(grinder
pumps
to
help
with
the
diges3on
processes) Bioaugmenta3on
(side
stream
nutrient
treatment) Digester
1,
2,
and
3
Rehabilita3on
(rehab
of
exis3ng
digesters) Manhole
rehabilita3on
/
Repair Pressure
Zone
1,

3
Pressure
Reducing
Valve
Sta3ons WWTP
Plant
Automa3on WWTP
Reuse
Demonstra3on
Project
(reuse
project
at
Heroes
Park) Headworks
Odor
Control
(building
around
the
headworks
structure
with
odor
control) IFAS
(fixed
film
process
for
increased
aera3on
basin
capacity) Primary
Fermenta3on
(conversion
of
two
exis3ng
primary
clarifiers
to
fermenters) Amity
Road
Waterline Downtown
sewer
Rehabilita3on Well
28
Well
and
Pumphouse Headworks
Fine
Screens
(greater
removal
efficiencies
in
the
headworks) Ter3ary
Filters
Project
(three
cloth
media
filters
and
piping
upgrades) WWTP
Struvite
Recovery 2
Million
Gallon
Drinking
Water
Reservoir:
Civil,
Structural,
and
Geotechnical
Engineers
/
Technicians
(6),
 Excava3on
and
Earthwork
(6),
Pipe
Crew
(4),
Concrete
/
Metal
Crew
(12),
Coa3ng
Crew
(3),
Electricians
(3),
 Paving
Crew
(5),
Landscape
and
Fencing

Funding
Required Jobs 










5,000,000
 










1,800,000
 1 












200,000
 2 










6,000,000
 2 










1,500,000
 2 










3,000,000
 4 










8,500,000
 4 










1,000,000
 0 










3,000,000
 12 










1,500,000
 12 










1,500,000
 










1,200,000
 










1,500,000
 








20,000,000
 










2,000,000
 










3,000,000
 








15,000,000
 










1,300,000
 










5,000,000
 










1,000,000
 










2,300,000
 










9,800,000
 










6,000,000
 










1,900,000
 












300,000
 










2,500,000
 










1,300,000
 










4,000,000
 










4,000,000
 












500,000
 












800,000
 3 












250,000
 










5,000,000
 










5,000,000
 0 










1,800,000
 0 










2,000,000
 2 












500,000
 4 












500,000
 5 












600,000
 6 












862,500
 9 










3,000,000
 30 












700,000
 












500,000
 










1,900,000
 












100,000
 










1,000,000
 












500,000
 










2,000,000
 










1,891,000
 










2,735,000
 










3,855,000
 










7,295,000
 










9,375,000


2 3 5 2 3 4 5 20 30 40 75 95












2,500,000
 












100,000
 












250,000
 












235,000
 












150,000
 












700,000
 












750,000
 












660,000
 










2,000,000
 












450,000
 












450,000
 












800,000
 










1,000,000
 










1,400,000
 










1,250,000
 












350,000
 










1,500,000
 












700,000
 










2,500,000
 










3,170,000
 










2,750,000


1 1 2 2 3 3 4 4 4 4 4 4 5 5 5 6 6 7 8 8 8












4,500,000


47

City

State

Program

Montpelier Montpelier Montpelier Montpelier Murtaugh Murtaugh Murtaugh Murtaugh Newdale Newdale Newdale Newdale Newdale Orofino Paris Paris Paris Paris Pocatello Pocatello

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

CDBG Streets/Roads Streets/Roads Streets/Roads Schools Streets/Roads Streets/Roads Water CDBG Streets/Roads Streets/Roads Streets/Roads Water Energy CDBG Streets/Roads Streets/Roads Streets/Roads Airport CDBG

5th
and
8th
street
Enhancement/Beau3fica3on Construct
a
5.7
mile
Bike
Path Construct/Reconstruct
20
miles
of
Sidewalk Reconstruct
10
miles
of
Failed
roadway New
Reader
Board Road
Improvements Railroad
Crossings
(2) Wastewater
Treatment
Facility Street
Light
Enhancement
Program Construct/Reconstruct
6
miles
of
Sidewalk Construct
a
5.5
mile
bike
path Reconstruct
3
miles
of
failed
roadway Wastewater
Treatment Clearwater
County
Woody
Biomass
Cogenera3on
Facility Center
Street
and
1st
South
Enhancement/Beau3fica3on Construct/Reconstruct
12
Miles
of
Sidewalk Construct
a
5
mile
Bike
Path Reconstruct
6
miles
of
failed
roadway Complete
air
terminal
expansion
to
improve
func3onality
&
customer
service Gateway
West
Industrial
complex;
refurbish
internal
rail
lines
to
support
growing
alterna3ve
energy
industries.

Project
Descrip3on

Pocatello Pocatello Pocatello Pocatello Pocatello Pocatello

ID ID ID ID ID ID

CDBG Energy Energy Energy Housing Public
Safety

Pocatello Pocatello Pocatello Pocatello Pocatello Pocatello

ID ID ID ID ID ID

Schools Schools Schools Schools Schools Streets/Roads

Joint
ISU/City
accelerator
research
facility
upgrade
and
rent
assistance Replace
hea3ng
&
cooling
system,
including
controls
in
Marshall
Library Retrofit
ligh3ng
in
Marshall
Library
to
achieve
energy
efficiency Upgrade
&
improve
insula3on
of
Marshall
Library
to
achieve
energy
savings Moderniza3on/replacement
of
sec3on
236
housing
for
low
income
families Expand
the
Six‐County
Juvenile
Deten3on
Center.

Current
facility
is
at
or
over
capacity
on
a
frequent
basis
and
 lacks
treatment
programs Entry
Door
Replacement‐various
schools Window
Replacement‐Irving
Middle
School Modernize
each
classroom
with
first‐class
Instruc3onal
technology Roof
Replacement‐Highland
High
School HVAC
Moderniza3on‐old
Jefferson
School 2
1/2
Mile
Bridge
replacement
project.

This
bridge
is
in
poor
condi3on
and
is
a
traffic
and
safety
hazard

Pocatello

ID

Streets/Roads

Pocatello

ID

Pocatello

Funding
Required Jobs 












500,000
 5 












862,500
 9 










1,200,000
 12 










6,000,000
 60 














24,000
 2 












380,000
 38 












780,000
 78 










6,600,000
 660 












500,000
 5 












360,000
 4 












825,000
 8 










1,800,000
 18 








25,000,000
 50 








30,000,000
 200 












150,000
 2 












720,000
 7 












750,000
 8 










3,600,000
 36 










2,500,000
 20 










1,000,000
 












920,000
 












150,000
 














20,000
 














75,000
 










2,000,000


15 20 4 4 6 35












2,000,000
 












162,000
 












360,000
 










4,500,000
 












170,000
 










1,600,000


6 5 5 10 10 60














288,000


12














600,000


20

Streets/Roads

Custer
Street
bridge
replacement
project.

Replace
a
40
foot
span,
2‐lane
bridge
over
the
Portneuf
River
that
 has
outlived
its
useful
life Gathe
Rd
&
Intersec3on
Realignment
‐
safer
for
vehicles/pedestrians














600,000


20

ID

Streets/Roads

Gould
St
Overpass
Bridge
‐
repair
&
seal
bridge
&
replace
approach
pavement














550,000


20

Pocatello

ID

Streets/Roads












5,400,000


20

Pocatello

ID

Transit

Highway
overlay
project.

Twenty‐seven
miles
of
county
roadways
rate
as
poor
or
very
poor
and
require
overlay
 maintenance Remaining
funds
to
replace
obsolete
transit
shop
facility












1,389,000


30

Pocatello

ID

Water












4,500,000


4

Pocatello

ID

Water














750,000


15

Pocatello

ID

Water














650,000


15

Pocatello

ID

Water

Rexburg Rexburg Rexburg Rexburg Rexburg Rexburg Rupert Salmon Shelley Shelley Shelley Shelley Shelley Shelley Shelley Shelley Soda
Springs Soda
Springs Soda
Springs Soda
Springs St.
Charles St.
Charles St.
Charles St.
Charles Sugar
City Sugar
City Sugar
City Sugar
City Sugar
City

ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID ID

Airport Airport Airport Airport Airport Airport Water Energy CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water CDBG Streets/Roads Streets/Roads Streets/Roads CDBG Streets/Roads Streets/Roads Streets/Roads CDBG Streets/Roads Streets/Roads Streets/Roads Water










22,000,000
 












120,000
 












100,000
 












100,000
 














50,000
 












200,000
 












250,000
 










6,000,000
 








30,000,000
 












500,000
 












900,000
 










1,200,000
 










4,000,000
 










6,000,000
 












500,000
 










2,000,000
 










2,000,000
 












500,000
 












720,000
 












862,500
 










3,600,000
 












150,000
 












360,000
 












600,000
 










1,800,000
 












500,000
 












600,000
 












750,000
 










3,000,000
 










1,000,000


200 0 1 1 1 2 2 600 200 5 9 12 40 60 3 10 10 5 7 9 36 2 4 6 18 5 6 8 30 5

Landfill
Gas
Collec3on
System.

To
avoid
EPA
emission
standards,
the
landfill
must
construct
a
landfill
gas
 collec3on
system.

This
system
can
also
create
a
renewable
energy
source Johnny
Creek
water
line
and
Spaulding
Booster
Sta3on
rebuild.

Necessary
for
pressure
zone
and
water
 delivery
integrity
for
both
a
source
of
safe
drinking
water
and
fire
protec3on Oak
and
Harrison
sanitary
sewer
rehabilita3on.

These
sewers
have
aged
well
beyond
effec3ve
life
and
need
to
 be
replaced/rehabiliated.

Failure
of
these
systems
threaten
groundwater
and
nearby
businesses
and
 residences Northwest
Sewer
Interceptor
Project.

Provide
sewer
service
for
a
large
and
growing
geography
in
the
city's
 impact
area.

The
large
number
of
sep3c
systems
currently
in
use
are
a
threat
to
the
ground
water
in
this
area Snow
Plow Runway
Ligh3ng
Replacement
and
Improvement Security
Gate
Replacement Taxi‐way
Repair ILS
Approach
System Runway
Chip
Seal Rupert
Phase
II
Wastewater Lemhi
County
Woody
Biomass
Cogenera3on
Facility Emerson
Street,
Holmes
Ave.
and
Fir
Street
Enhancement/Beau3fica3on Construct
a
6
mile
Bike
Path Construct/Reconstruct
20
miles
of
Sidewalk Shelley
Bypass
Road
Construc3on Reconstruct
10
miles
of
failed
roadway New
Potable
Water
Well Water
Distrubu3on
Upgrade Water
Storage
Tank Downtown,
Center
Street,
and
Hooper
Street
Beau3fica3on Construct/Reconstruct
12
miles
of
Sidewalk Construct
a
5.75
mile
Bike
Path Reconstruct
6
miles
of
failed
roadway Street
Light
Enhancement
Program Construct/Reconstruct
6
miles
of
Sidewalk Construct
a
4
mile
Bike
Path Reconstruct
6
miles
of
failed
roadway Main
Street,
3rd
South
and
Teton
Ave
Enhancement Construct/Reconstruct
10
miles
of
Sidewalk Construct
a
5
mile
Bike
Path Reconstruct
5
miles
of
failed
roadway Develop
new
wells
water
system
improvements

City

State

Program

Sugar
City Teton Teton Teton Teton Teton Addison

ID ID ID ID ID ID IL

Water CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Addison

IL

Streets/Roads

Addison Addison

IL IL

Streets/Roads Water

Alsip Alsip Alsip Alsip Alsip Alsip Alsip Alsip Alton

IL IL IL IL IL IL IL IL IL

Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water CDBG

Alton

IL

CDBG

Alton

IL

Streets/Roads

Alton

IL

Streets/Roads

Amboy

IL

CDBG

Amboy

IL

CDBG

Amboy

IL

CDBG

Amboy

IL

CDBG

Amboy

IL

CDBG

Arlington
Heights

IL

CDBG

Water
Storage
Tank Street
Light
Enhancement
Program 3rd
East
Bridge
Reconstruct Construct/Reconstruct
6
miles
of
Sidewalk Construct
a
4
mile
Bike
Path Reconstruct
3
miles
of
failed
roadway Resurfacing
of
approximately
10
miles
of
various
industrial
streets
within
the
village.
Our
industrial
streets
are
 typical
2‐lanes,
44
back
to
back
of
curb
and
gufer.
It
will
be
resurfaced
with
1.5
inches

of
bituminous
asphalt,
 some
storm
sewers, Resurfacing
of
approximately
10
miles
of
various
residen3al
streets
within
the
village.
Our
residen3al
streets
 are
typical
2‐lanes,
34
back
to
back
of
curb
and
gufer.
It
will
be
resurfaced
with
1.5
inches

of
bituminous
 asphalt,
some
storm
sewers, Resurfacing
of
Swib
Road
from
US
20
to
Collins
Avenue,
an
approximate
4
mile
long
village
minor
arterial
 Provide
water
to
the
53
Estetes
subdivision
by
the
installa3on
of
eight
inches
diameter
watermains
and
stubs,
 valve
vaults,
fire
hydrants,
valve
boxes,
bituminous
patching
and
restora3on
of
disturbed
areas
such
as
 parkways,
driveways,
ditches
and
drainage COPS
Universal
Hiring
Program Village
wide
sidewalk
replacement
program Laramie
Avenue
Reconstruc3on 128th
Place
and
Ridgeway
Reconstruc3on Springfield
and
Hamlin
Avenue
Reconstruc3ons Miscellaneous
local
street
resurfacing Pump
Sta3on
and
Reservoir
Expansion Sanitary
Cured‐in‐Place
Sewer
Lining Expansion
of
the
downtown
streetscape
improvement
project
to
compliment
development
projects
currently
 under
construc3on,
including
the
Madison
County
Transit
transfer
sta3on
and
the
Landmarks
Boulevard
 Pedestrian
Overpass.

Project
improvements
include The
City
of
Alton
seeks
funding
to
complete
an
urban
redevelopment
project
located
within
a
blighted
area
of
 Alton's
central
business
district.

The
three
(3)
block
project
area
suffers
from
a
host
of
environmental
 remedia3on
and
flood
plain
issues
aber Construc3on
of
a
278'
extension
of
Morrison
Avenue
from
Cpl.
Belchik
Memorial
Expressway
(formerly
Indiana
 Ave.)
to
Alton
Steel
Industrial
Park.

The
roadway
improvements
would
accommodate
and
improve
access
for
 industrial
and
commercial
transport. The
widening
of
Fosterburg
Rd.
from
IL
Route
255
south
to
IL
Route
140.

Project
includes
the
expansion
of
 lanes
from
10'
to
12'
plus
the
addi3on
of
a
bi‐direc3onal
turn
lane.

Addi3onal
improvements
include
patching
 and
repaving
of
exis3ng
surfaces,
 Construc3on
of
an
addi3onal
maintenance
building
that
would
allow
for
more
storage
space
and
maintenance
 on
equipment. Complete
reconstruc3on
of
the
en3re
Provost
Street
sec3on
in
front
of
Central
School,
while
reconstruc3ng
all
 the
u3li3es
and
making
drainage
improvements. Providing
a
park
at
the
North
end
of
the
City,
with
a
playground,
sand
volleyball
court,
green
space,
and
a
pool.

 Along
with
this
is
a
deten3on
facility
to
prevent
flooding
downstream. Complete
reconstruc3on
of
the
en3re
East
Main
Street
sec3on
while
reconstruc3ng
all
of
the
u3li3es
and
 making
drainage
improvements. Complete
reconstruc3on
of
the
en3re
Division
Street
sec3on,
between
Prospect
Street
and
East
Main
Street,
 while
reconstruc3ng
all
of
the
u3li3es
and
making
drainage
improvements. Street
Resurfacing

Project
Descrip3on

Arlington
Heights

IL

CDBG

Street
Rehabilita3on

Arlington
Heights Arlington
Heights Arlington
Heights Arlington
Heights Arlington
Heights Aurora Aurora Aurora Aurora Aurora Aurora

IL IL IL IL IL IL IL IL IL IL IL

Energy Streets/Roads Streets/Roads Water Water Airport Streets/Roads Streets/Roads Transit Water Water

Renewable
Energy;
solar
power
for
downtown
train
sta3on Street
Resurfacing Street
Rehabilita3on Sanitary
Lib
Sta3on
Elimina3on Water
&
Sewer
Intrastructure
Rehabilita3on Airport
Runway
18/36
Reconstruc3on Traffic
Signal
Installa3on
at
4
congested
intersec3ons Overlay
of
exis3ng
streets Construc3on
of
Sta3on
Blvd
from
Liberty
Street
to
the
Metra
Commuter
Sta3on
to
improve
traffic
flow
and
 Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
13
‐
Phase
2 Water
Main
replacement
projects
on
5
roadways

Aurora Aurora Bartlef Bartlef Bartlef

IL IL IL IL IL

Water Water CDBG CDBG CDBG

Bartlef

IL

Water

Bartlef

IL

Water

Bartlef

IL

Water

Blue
Island

IL

Streets/Roads

Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
6 Combined
Sewer
Overflow
/
Sewer
Separa3on
Project
‐
Basin
13
‐
Phase
3 West
Bartlef
and
Naperville
Roads
Bike
Path
‐
This
project
consists
of
installing
a
10
foot
wide
bike
path
within
 Schick
Rd.
Bridge
Repairs
‐
Repairing
the
Schick
Road
Bridge
substructure
and
abutments
as
well
as
the
east
 Route
25
Road
Improvements
‐
These
road
improvements
will
provide
access
to
the
Blue
Heron
Business
Park
 and
the
Bluff
City
Industrial
Park. Influent
Pump
Replacement
‐
This
project
consists
of
replacing
the
three
influent
pumps
and
control
system
at
 the
Stearns
Road
Wastewater
Treatment
Plant.

The
pumps
were
installed
in
1975.

Since
that
3me
the
pumps
 and
drive
system
have
become
obsolete. Stearns
Rd.
Iron
Filter
Tank
Replacement
‐
The
project
consists
of
replacing
the
tank
for
the
exis3ng
iron
 removal
filter.

The
exis3ng
tank
is
over
20
years
old
and
has
significant
corrosion. Well
#8
Barium
and
Radium
Removal
System
‐
This
project
consists
of
a
new
treatment
system
to
remove
 barium
and
radium
from
Well
#8.

This
well
draws
from
the
same
water
aquifer
as
Well
#4
(Stearns
Road
 Booster
Sta3on)
and
Well
#7
(Kent
Circle
Water
Sta3on) Resurfacing
135th
St,
136th
St

Blue
Island

IL

Streets/Roads

Resurfacing
Grove,
Chatham

Blue
Island Blue
Island Blue
Island

IL IL IL

Streets/Roads Streets/Roads Streets/Roads

Resurfacing
123rd
Pl,
Krueger,
Orchard,
Collins Resurfacing
135th
St,
Mozart,
California,
Vine Resurfacing
Groove,
Ann,
James

Funding
Required 










2,400,000
 












150,000
 












150,000
 












360,000
 












600,000
 










1,800,000


Jobs 12 2 2 4 6 18










12,200,000


60












4,400,000
 










9,245,000


60 60












4,400,000
 












225,000
 












425,000
 












600,000
 












650,000
 












700,000
 










4,500,000
 












800,000
 










1,000,000


50 3 14 16 22 23 150 21 26














750,000


100












2,000,000


200














240,000


100












4,245,938


100














250,000


7












1,000,000


28












2,300,000


64












2,500,000


70












3,400,000


95












1,500,000


20












2,000,000
 















1,500
 








15,000,000
 








20,000,000
 










2,000,000
 








10,000,000
 










3,000,000
 












450,000
 










4,000,000
 










7,500,000
 












600,000


25 20 25 10 20 76 24 82 107 30












1,910,000
 










2,200,000
 










3,000,000
 












276,000
 












430,000


45 56 68 12 25












2,499,000


50














315,000


6














275,000


9














480,000


12












1,200,000


35












1,300,000
 










1,500,000
 










1,350,000
 










1,300,000


39 43 44 44

City

State

Program

Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Blue
Island Bolingbrook Bolingbrook Bolingbrook Bolingbrook

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Airport Airport Airport CDBG

Resurfacing
Handicap
Ramps
and
Sidewalk
Replacement Resurfacing
Curb
Removal
and
Replacement Reconstruc3on
of
119th
Street
and
Division
Street Resurfacing
Grunewald,
Orchard,
Greenwood,
Artesian Resurfacing
119th
Pl,
120th
St,
120th
Pl,
Gregory Resurfacing
Collins,
Cochran,
Lewis,
Birdsall,
Greenwood Resurfacing
119th
Pl,
120th
St,
120th
Pl,
121st
St.
Longwood Resurfacing
Union,
High,
York,
New Resurfacing
Minnesota,
Edison,
Everef,
Wahl,
Francisco,
California Resurfacing
Canal,
Rexford,
Gregory,
Irving,
Chicago,
Hoyne,
Seeley Street
Ligh3ng Resurfacing
120th
Pl,
121st
St,
122nd
St,
Grunewald,
Orchard,
Highland,
Maple,
Ann Bridge
Rehabilita3on
Division
Street
Bridge
Over
Calumet
Sag
Channel Bridge
Rehabili3on
Chatham
Street
Bridge
Over
Calumet
Sag
Channel Repain3ng
1,000,000
Gallon
Elevated
Tank
(Thorton‐Blue
Island
Road) Fire
Hydrant
Removal
and
Replacement Water
valve
removal
and
replacement Repain3ng
1,000,000
Gallon
Elevated
Tank
(Highland
Avenue) Manhole
Lining Relining
Combina3on
Sewers New
Runway
at
Bolingbrook‐Clow
Airport Clow
Airport,
runway
improvements:
widen
exis3ng
runway
to
allow
use
by
larger
planes. Clow
Airport:
add
addi3onal
hangers. Kings
Road
Extension

Project
Descrip3on

Bolingbrook Bolingbrook Bolingbrook Bolingbrook

IL IL IL IL

CDBG CDBG CDBG CDBG

Bolingbrook

IL

CDBG

Bolingbrook

IL

CDBG

Bolingbrook

IL

CDBG

Bolingbrook

IL

CDBG

Lily
Cach
Lane
Widdening Public
Works
Garage,
add
heavy
duty
shelving:

add
shelving
to
enable
safe
and
cost
effec3ve
storage
of
 Historic
Bolingbrook
sidewalk
construc3on:

phase
11
includes
construc3ng
sidewalks
in
neighborhoods
that
 River
Woods
erosion
control,
phase
2:

installa3on
of
gabion
baskets,
rip‐rap,
and
other
non‐stuctural
 measures
to
restore
the
highly
eroded
banks
of
the
creek
in
the
River
Woods
neighborhood. Boughton
Road
sidewalk:
construct
sidewalk
and
related
work
to
fill
in
missing
gap
in
sidewalk
network
on
 Boughton
Road
by
the
Independent
Bap3st
Church. Barbers
Corners
water
&
sewer:

installa3on
of
water
and
sewer
lines
to
remove
several
houses
from
well
and
 sep3c
systems. Briarcliff
Road
stormsewer:

replace
a
few
hundred
feet
of
stormsewer
on
Briarcliff
Road
as
part
of
the
master
 plan
to
resolve
flooding

problems
in
Historic
Bolingbrook. Cumberland
Pond:

dredging
and
rehabilita3on
of
pond
to
improve
water
quality,
fish
habitat,
and
aeste3cs.

Bolingbrook

IL

CDBG

Police
Department
expansion:

construc3on
of
an
addi3on
to
the
curent
Police
Department
facility.

Bolingbrook

IL

Streets/Roads

Full
interchange
at
I‐55
and
Il.
Rt.
126

Bolingbrook

IL

Streets/Roads

Traffic
signal
at
entrance
to
Gateway
East
and
Costco
site.

Bolingbrook Bolingbrook Bolingbrook Bolingbrook

IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Traffic
signal
on
Hassert
Boulevard
and
Kings
Road. Traffic
signal
on
Remington
Boulevard
and
Schmidt
Road,
plus
interconnect
to
traffic
signal
at
hospital
 Traffic
signal
on
Remington
Boulevard
at
entrance
to
Adven3st
Bolingbrook
Hospital. Clow
Airport
traffic
Circle:
install
a
traffic
circle
on
Clow
Parkway
to
safely
guide
traffic
into
the
airport.

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Frontage
Road
removal:

remove
abandoned
frontage
road
and
replace
with
topsoil
and
turf
from
Weber
Road
 to
Remington
Boulevard. Route
53
entrances
to
Arena
Auto
Auc3on:

remove
obsolete
entrances
/
turn
bays
built
for
former
Old
Chicago
 amusement
park. Kings
Road
landscaped
median:

construct
landscaped
median
to
calm
traffic,
reduce
runoff,
and
beau3fy
the
 roadway. Weber
Road
landscaped
medians,
north
and
south
of
Jennifer
Lane.

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook Bolingbrook

IL IL

Streets/Roads Streets/Roads

Bolingbrook

IL

Streets/Roads

Bolingbrook

IL

Bolingbrook

Funding
Required Jobs 










1,450,000
 49 










1,500,000
 50 










1,700,000
 52 










1,900,000
 57 










1,750,000
 60 










1,800,000
 60 










1,900,000
 64 










1,900,000
 65 










2,200,000
 74 










2,400,000
 80 










2,500,000
 83 










2,600,000
 87 










6,500,000
 217 










6,500,000
 217 












750,000
 25 












840,000
 30 












875,000
 30 












900,000
 35 










1,500,000
 50 










1,750,000
 60 








10,000,000
 








10,000,000
 22 










4,000,000
 50 








10,000,000
 










4,000,000
 












100,000
 












200,000


5 10














200,000


10














200,000


14














400,000


15














500,000


18














700,000


24










10,000,000


95










12,000,000
 












300,000
 












300,000
 












300,000
 












300,000


5 5 5 5














100,000


10














300,000


10














100,000


11














400,000


15














400,000


15












3,000,000


23












2,000,000


30














700,000


48

Lindsey
Lane,
Lily
Cache
Lane
to
exis3ng
Lindsey
Lane
stub:

construct
new
roadway
to
provide
access
to
Jane
 Addams
School
(school
district
project,
with
recapture
from
future
developers). Reagan
Boulevard
from
Danhoff
Lane
to
Plainfield‐Naperville
Road:

reconstruc3on
of
a
two
lane
country
 Traffic
signal
at
St.
James
and
Joliet
Road,
and
roadway
improvements
to
the
north
leg
of
intersec3on.












1,000,000
 












900,000


58 58














800,000


58












6,800,000


70

Streets/Roads

Kings
Road,
Hassert
to
Rodeo:

construct
urban
cross‐sec3on
roadway
with
landscaped
median
and
bridge
over
 the
Lily
Cache
Creek. Lily
Cache
Lane,
Route
53
to
Schmidt
Road:

reconstruct
2
lane
roadway
to
4
lanes
plus
a
landscaped
median.












5,900,000


70

IL

Transit

I‐55
full
interchange
at
Rt.
126










12,000,000


Bolingbrook

IL

Water

Sewer
plant
expansion
at
Indian
Boundary
treatment
plant

Bollingbrook Bourbonnais Bourbonnais

IL IL IL

Streets/Roads Streets/Roads Streets/Roads

Traffic
signal
on
Route
53
and
Edgehill
Drive
/
Market
Square
Shopping
Center
(Walmart) Bourbonnais
Creek
Improvements Armour
Road
widening
and
resurfacing










10,000,000
 












900,000
 










1,000,000


58 35

Bourbonnais Bridgeview Bridgeview Bridgeview Bridgeview Bridgeview Bridgeview Bridgeview Bridgeview

IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water

Burns
Road
West
reconstruc3on Harlem
Avenue
Frontage
Road
Street
Ligh3ng Harlem
Avenue
Sidewalk
and
Curb
Replacement Roadway
Resurfacing
Program Harlem
Avenue
Widening
at
70th
Street Extension
of
Octavia
Avenue
with
U3li3es 71st
Street
&
Harlem
Avenue
Transporta3on
Center Sanitary
Sewer
Rehabilita3on
South
of
71st
Street 100th
Place
Storm
Sewer












3,400,000
 










4,100,000
 












187,000
 












200,000
 












473,000
 












650,000
 










1,900,000
 










1,700,000
 












379,000
 












450,000


121 146 7 7 16 22 63 34 13 15

Boughton
Road
rehabilita3on,
Pinecrest
to
Schmidt:
repair
curbs
and
stormsewers
then
patch
and
pave
 roadway. Road
rehabilita3on
program:

perform
pavement
maintenance
ac3vi3es
up
to
and
including
paving
on
a
 number
of
streets
that
have
not
been
paved
in
over
20
years. St.
Andrew's
Drive
extension:

extend
St.
Andrew's
Drive
and
connect
to
quarry
driveway.

City

State

Program

Bridgeview Buda Bureau
Junc3on Bureau
Junc3on

IL IL IL IL

Water CDBG CDBG Water

Elevated
Water
Tank
at
71st
Street Construct
new
deep
water
supply
well
to
replace
exis3ng
well
that
has
failed,
and
connect
to
Village
treatment
 Construc3on
of
new
building
for
the
fire
department. Dredge
aerated
lagoons,
replace
broken
and
deteriorated
valves
and
diffusers,
and
make
repairs
to
sand
filters.

Project
Descrip3on

Funding
Required 










2,100,000
 












600,000
 












215,000


Jobs 70 17 6

Bureau
Junc3on

IL

Water

Burnham

IL

Streets/Roads

Construc3on
of
a
new
deep
water
well
for
the
purpose
of
removing
elevated
level
of
radium
from
the
water
 supply.
Provide
booster
pump,
filtra3on,
and
transmission
water
main
for
newly
acquired
well
to
water
 treatment
plant
as
back
up.
 Village‐wide
water
valve
replacement
program.














180,000


5














940,000


27














105,000


Burnham

IL

Streets/Roads

Village‐wide
manhole
rehabilita3on
program.

3














160,000
 












450,000
 












350,000


Burnham Carbon
Hill Carbon
Hill

IL IL IL

Streets/Roads CDBG CDBG

Unfunded
grant
for
local
street
resurfacing.
IDOT
has
already
approved
plans,
specifica3ons,
agreements,
and
 Street
repairs Storm
sewer
improvements

4 12 10

Carbon
Hill Calumet
City Calumet
City

IL IL IL

CDBG Energy Streets/Roads

Construc3on
of
a
new
wastewater
treatment
and
collec3on
system.
The
community
has
no
central
sanitary
 LED
Bulb
Replacement
at
traffic
Signals Various
Street
Resurfacing
in
Calumet
City














400,000
 










2,275,000
 












326,000


11 64 5

Calumet
City Calumet
City Calumet
City

IL IL IL

Streets/Roads Streets/Roads Streets/Roads

Burnham
Avenue
at
Marble
Street
Intersec3on‐
Intersec3on
Improvement
(intsersec3on
on
Bridge) Marble
Street
Roadway‐Roadway
Construc3on
and
New
Bridge
over
the
Grand
Calumet
River River
Oaks
Drive
at
Paxton
Ave,
Intersersec3on
Improvement
and
New
Traffic
Signals














550,000
 










6,900,000
 










2,800,000


20 50 50

Calumet
City

IL

Water

Sanitary
and
Storm
Sewer
Lining,
Various
Loca3ons
throughout
Calumet
City














778,000
 












500,000


50 5

Calumet
City

IL

Water

Ground
Reservoir
Rehabilita3on














650,000


50

Canton

IL

CDBG












2,000,000


1225

Canton

IL

Streets/Roads












4,000,000


25

Canton

IL

Water














350,000


10

Canton

IL

Water

The
City
of
Canton
is
“shovel
ready”
to
upgrade
its
water
and
sewer
system,
downtown
street
and
public
right
 of
way
infrastructure,
and
make
improvements
to
the
former
Interna3onal
Harvester
brownfield
site
for
 redevelopment
 Downtown
public
right
of
way
infrastructure:

To
promote
safe
and
afrac3ve
pedestrian
uses
through
 con3nuous
sidewalks,
traffic
calming
features,
enhanced
pedestrian
crossings,
raised
seat‐walls/planters;
curb
 bump‐outs;
light
poles
and
other
streetscapes Illinois
Route
78
Water
Main
Replacement:
Replace
sec3ons
of
water
main
that
must
be
relocated
due
to
 proposed
improvements
to
Illinois
Route
78.

 Kilroy
Sewage
Pumping
Sta3on
Force
Main
Replacement:
Replace
exis3ng
14”
diameter
sewage
force
main.















750,000


10

Canton

IL

Water










10,000,000


25

Canton

IL

Water










12,700,000


50

Canton

IL

Water












6,000,000


50

Carpentersville

IL

CDBG














250,000


5

Carpentersville

IL

CDBG












5,000,000


20

Carpentersville

IL

CDBG












2,000,000


30

Carpentersville

IL

CDBG












1,463,000


32

Carpentersville

IL

Public
Safety

Water
Tower
and
Associated
Water
Main
Improvements:

Proposed
elevated
storage
tank
to
supplement
water
 storage
within
the
City’s
water
distribu3on
system.
Proposed
water
main
extensions
to
help
with
pressure
and
 flow
problems
throughout
the
City’s
water Wastewater
Treatment
Plant
Improvements:
Increase
capacity
via
a
new
extended
aera3on
ac3vated
sludge
 treatment
facility
to
replace
exis3ng
1938
WPA
plant.

Upgrades
include
a
recondi3on
of
return
ac3vated
 sludge
sta3ons,
lib
sta3ons
throughout
th Water
Treatment
Plant
Improvements:

Increase
capacity
via
a
new
treatment
facility
to
replace
exis3ng
1938
 WPA
plant.

Upgrades
include
installa3on
of
a
new
clarifier,
filters,
pumping
sta3on,
chemical
feed
system,
an
 upgrade
of
the
piping
system
and
 Streetlight
Installa3on
(installa3on
of
~40
addi3onal
streetlights
to
deter
crime
and
enhance
pedestrian
and
 motorist
safety) Street,
Sidewalk,
Storm,
Sanitary
Sewer
and
Water
Main
Infrastructure
Improvement
Program
(Aus3n
Avenue,
 Houston
Drive,
Salem
Lane,
and
Berkley
Street Fire
Sta3on
No.
2
Remodeling
and
Addi3on
(renova3on
of
exis3ng
sta3on
to
meet
present
day
needs
and
 address
structural
issue) Morningside
Area
Redevlopment
(demoli3on,
crea3on
of
open
space,
construc3on
of
shared
parking
and
 dumpster
enclosures,
replacement
of
fencing) Traffic
Safety
Unit

Carpentersville

IL

Streets/Roads

Carpentersville

IL

Streets/Roads

Carpentersville

IL

Carpentersville














212,000


2

Kings
Road
Resurfacing
(including
some
sidewalk,
curb,
and
gufer
remvoval
and
replacement)














105,000


10














410,000


15

Streets/Roads

Helm
Road
Resurfacing
(including
some
sidewalk,
curb
and
gufer
removal
and
replacement,
as
well
as
some
 stormwater
system
improvements) Sleepy
Hollow
Road
and
Miller
Road
Resurfacing,
Related
Repairs,
and
Curb
Installa3on














270,000


15

IL

Streets/Roads

Tulsa
Avenue
Pavement
Resurfacing
(including
some
sidewalk,
curb,
and
gufer
removal
and
replacement)














240,000


15

Carpentersville

IL

Streets/Roads












1,700,000


20

Carpentersville

IL

Water

Miller
Road
West
Roadway
Reconstruc3on
(including
construc3on
of
new
curb,
gufer,
and
enclosed
 stormwater
drainage
system,
as
well
as
certain
intersec3on
improvements) Replacement
of
Water
System
Controls
and
Installa3on
of
Security
System














180,000


3

Carpentersville

IL

Water

Emergency
Power
Generator
for
Main
Wastewater
Treatment
Facility












1,800,000


5

Carpentersville

IL

Water

Lining
of
10,000
Lineal
Feet
of
Sanitary
Sewer
Main
to
Eliminate
Infiltra3on
and
Inflow














400,000


5

Carpentersville

IL

Water

Sludge
Press
Replacement

Cedar
Point Channahon

IL IL

Water CDBG

Water
main
looping
to
eliminate
dead
ends
and
deep
well
construc3on
for
radium
removal. sanitary
sewer
rehabilita3on
to
correct
inflow/infiltra3on
throughout
the
system
up
to
400
manholes












1,000,000
 










2,434,420


5 68














200,000


10

Channahon

IL

CDBG














155,000


15

Channahon

IL

CDBG














100,000


18

Channahon

IL

CDBG














180,000


20

Channahon

IL

CDBG














250,000


31

Channahon

IL

CDBG














579,000


35

Channahon

IL

CDBG














560,000


51

Channahon

IL

CDBG

1/2
mile
of
2"
asphalt
overlay
on
Ridge
Road
with
shoulder
and
striping
replacement
ready
to
go
Spring
of
 2009 sidewalk
addi3on
and
replacement
to
connect
exis3ng
bikepath
along
Rt
6
to
exis3ng
I&M
Canal
parks/walks
 Ready
Spring
2009 1/3
mile
of
3"
asphalt
structural
overlay
on
Tabler
Road
as
it
is
being
used
as
a
truck
route
along
with
shoulder
 improvements
and
striping
ready
to
go
in
Spring
2009 1/2
mile
of
Full
Depth
Reclama3on
of
exis3ng
roadway
and
stabiliza3on
with
asphalt
overlay
on
Hansel
Road
 design
complete
awai3ng
spring
2009
construc3on 3/4
mile
of
12"
duc3le
iron
water
main
connec3ng
two
dead
end
water
mains
from
Old
Kerry
Grove
Road
to
 Ridge
Road 3/4
mile
of
Full
Depth
Reclama3on
of
exis3ng
road
and
stabiliza3on
with
asphalt
overlay
in
Highlands
 subdivision
with
curb,
sidewalk
and
storm
sewer
repair
ready
to
go
in
Spring
2009 1
mile
of
12"
duc3le
iron
water
main
connec3ng
the
main
line
to
a
dead
end
line
to
form
a
loop
on
Dove
drive














780,000


55

Channahon

IL

CDBG














675,000


55

1
mile
of
road
to
be
reconstructed,
widened
to
accomodate
growing
traffic
between
two
towns.

Also,
we
need
 to
add
shoulders
and
ditches,
replacing
culverts
Ready
to
go
in
Spring
2010

City

State

Program

Channahon

IL

CDBG

Project
Descrip3on

Channahon

IL

CDBG

Channahon

IL

CDBG

Channahon

IL

CDBG

Cherry

IL

Water

Cherry

IL

Water

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Energy

Chicago
Heights

IL

Public
Safety

Chicago
Heights

IL

Streets/Roads

Holbrook
Sanitary
Lib
Sta3on(at
Hamil3on
Woods)

The
installa3on
would
include
a
20
KVA
Diesel
Generator,
 with
assiciated
weatherproof
sound
afenuated
enclosure,
integral
light
fixture
(
for
security),
ATS
(automa Joe
Orr
Sanitary
LIb
Sta3on
and
Storm
Water
Lib
Sta3on.

The
installa3on
would
include
a
20
KVA
Diesel
 Generatork
with
associated
weatherproof
sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ATS Lowe
Pump
Sta3on.

The
installa3on
would
indlude
a
325
KVA
Diesel
Generator,
with
associated
weatherproof
 sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ATS
(automa3c
tranfer
switch),
and
related Public
Works
Garage.

The
installa3on
would
include
an
80
KVA
Diesel
Generator,
with
associated
interior
 shound
afenuated
enclosure,
ATS
(automa3c
transfer
switch),
and
related
components,
conduit,
and
wiring,
 etc.

t Lansing
Pump
Sta3on.

a.

The
installa3on
would
include
a
450
KVA
Diesel
Generator,
with
associated
 weatherprof
sound
afenuated
enclosure,
integral
light
fixture
(for
security),
ASS
(automa3c
transfer
switch),
 and Police
Department.


Purchase
of
four
unmarked
police
vehicles.

This
is
to
replace
older
vehicles.

Purchase
of
 six
marked
police
vehicles.

Puchase
of
two
marked
traffic
unit
vehicles Street
Resurfacing
Ward
1

Chicago
Heights

IL

Streets/Roads

Street
Resurfacing
Ward
2

Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights

IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water

Street
Resurfacing
Ward
3 Street
Resurfacing
Ward
4 Street
Resurfacing
Ward
5 Street
Resurfacing
Ward
6 Division
Street
improvements
surrounds
two
schools.

One
of
the
schools
being
a
specialized
development
 Paint
Lansing
Booster
Sta3on Replace
120
Substandard
Fire
Hydrants

Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Chicago
Heights Cicero Cicero Cicero

IL IL IL IL IL IL IL IL IL IL IL IL

Water Water Water Water Water Water Water Water Water Housing Housing Streets/Roads

Cicero

IL

Water

Coal
City

IL

CDBG

Coal
City

IL

Water

Replace
75
Substandard
Water
Valves B‐Box
Replacement
Program Paint
Division
Street
Reservoir Paint
Lowe
Avenue
Reservoir Paint
State
Street
Elevated
Water
Tank Paint
State
Street
Ground
Storage
Reservoir Generator
Installa3on
of
Pump
Sta3ons
and
Lib
Sta3ons Sewer
Lining
‐
City
wide Replace
2750'
of
36"
Water
Main
under
I‐80 HOME
REPAIR
PROGRAM
 EMERGENCY
ASSISTANCE
HOUSING
PROGRAM STREET
RESURFACING/RECONSTRUCTION
 The
Town
of
Cicero’s
proposed
project
would
consist
of
resurfacing
or
reconstruc3ng
more
than
20
miles
 (108,680
lineal
feet)
of
streets.
More
than
100
blocks
would
be
involved
at
an
es3mated
cost
of
$16,250,000.
 NEW
WATER
PUMPING
STATION The
Town
of
Cicero’s
propose
project
would
consist
of
a
pumping
sta3on
on
the
side
of
the
Town
including
an
 addi3onal
City
of
Chicago
water
connec3on.

This
will
provide
befer
fire
flow
rates
for
exis3ng
commercial Mul3‐faceted
project
includes
traffic
management,
storm
water
conveyance,
ADA
modifica3ons
and
street
 scape
improvements
top
jump
start
retail
investment
in
a
newly
burgeoning
residen3al
community. Storm
sewer
re‐construc3on
project.

Rebuild
aging
storm
sewers
according
to
established
plan.

Crest
Hill

IL

CDBG

East
Bain
Manhole
Rehabilita3on

Crest
Hill

IL

CDBG

Dearborn
St.
Watermain
Replacement

Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crest
Hill Crystal
Lake Crystal
Lake Crystal
Lake

IL IL IL IL IL IL IL IL IL IL IL IL

CDBG CDBG CDBG CDBG Water Water Water Water Water CDBG CDBG CDBG

Crystal
Lake

IL

Water

Hickory
St.
Watermain
Replacement Nicholson
St.
Watermain
Replacement City‐wide
Street
Resurfacing East
Bain
Sewer
Lining East
Basin
Manhole
Rehabilita3on Dearborn
St.
Watermain
Replacement Hickory
St.
Watermain
Replacement Nicholson
St.
Watermain
Replacement East
Basin
Sewer
Lining Virginia
Street
Corridor
Project
‐

The
project
would
add
streetscape,
overhead
u3lity
reloca3on,
repaving,
new
 Vulcan
Lakes
Improvements
‐
The
first
phase
of
this
new
public
recrea3on
facility
includes
water
and
sewer
 Downtown
Parking
Structure‐
The
City
would
greatly
expand
parking
opportuni3es
with
the
construc3on
of
a
 416
space
parking
structure
in
Historic
Downtown
Crystal
Lake. Northwest
Area
Trunk
Sewer
‐
The
project
is
divided
into
$14,000,000
for
sanitary
sewer
and
$2,000,000
for
 storm
sewer
improvements
to
provide
sanitary
sewer
service
for
the
City’s
northwest
area.

3/4
mile
of
reconstruc3on
on
Blackberry
Dr
which
is
the
only
access
point
for
the
educa3on
center
and
public
 works
garage
phase
1&2
engineering
Spring
09
and
construct
Fall
09
to
Spring
2010 Interconnec3ng
1
mile
of
bikepath/
safe
passage
from
west
side
of
town
to
east
side
of
town
and
park
 district/shopping
area
located
along
Bridge
Street
ready
to
build
in
fall
2009 new
water
tower
for
the
industrial
area
east
of
I55 Reconstruc3on
and
widening
of
1/2
mile
of
class
2
truck
route
on
Dellos
Road
with
rehabilita3on
of
100
year
 old
bridge Rehabilita3on
of
treatment
plant. Construc3on
of
holding
pond
for
backwash
water,
rehabilita3on
of
treatment
plant
and
watermain
 replacement
in
cri3cal
areas. Division
Pump
Sta3on.

The
installa3on
would
include
an
80
KVA
Diesel
Generator,
with
assiciated
 weatherproff
sound
afenuated
enclusre,
integral
light
fixture,
(for
security),
ATS
(automa3c
transfer
switch)
 and
relat East
End
Pump
Sta3on.

The
installa3on
would
include
a
100
KVA
Diesel
Generator,
with
associated
 weatherproof
sound
afenuated
enclosure
integral
light
fixture,
for
security),
ATS
(automa3c
transfer
switch),
 and
relat State
Street
Pump
Sta3on
The
installa3on
would
include
a
275
Diesel
Generator.

Funding
Required

Jobs














489,000


55














299,000


57












1,540,000


85












1,575,000


95














365,000


10














765,000


21
















80,000















150,000
 












160,000
 














40,000


20
















80,000


50














220,000


50
















70,000


50














280,000


60














259,238


12














175,000


15














150,000
 












200,000
 












180,000
 












170,000
 












175,000
 












524,927
 












150,000


15 15 15 15 15 50 6














960,000
 












500,000
 












500,000
 












150,000
 












170,000
 












950,000
 












500,000
 










1,080,000
 










1,000,000
 










2,800,000
 










2,000,000
 










3,025,000


6 6 8 8 8 8 8 10 12 25 70 91










16,250,000


772










14,000,000


560












4,500,000


126












6,000,000


168














500,000


15














600,000
 












850,000
 












750,000
 










1,500,000
 










2,800,000
 












500,000
 












600,000
 












850,000
 












750,000
 










2,800,000
 










5,452,000
 










9,550,000


20 20 20 25 40 15 20 20 20 25 60 100










11,508,000


130










16,000,000


190

City

State

Program

Dalzell

IL

CDBG

Construc3on
of
new
well
to
provide
a
reliable
source
of
water.

Project
Descrip3on

Funding
Required

Jobs














524,000


15

Depue

IL

CDBG

Replace
obsolete
and
aging
tornado
sirens
that
do
not
cover
a
large
residen3al
area
of
the
Village.
















50,000


1

Depue

IL

CDBG

Complete
cleaning
and
re‐coa3ng
of
a
150,000
gallon
standpipe
water
storgae
facility.














125,000


4

Depue

IL

CDBG

Re‐surfacing
of
four
streets
in
the
village.

Depue Diamond Diamond

IL IL IL

Water CDBG CDBG

Replace
badly
deteriorated
sanitary
sewer
mains,
rehabilitate
por3ons
of
wastewater
treatment
plant,
replace
 Storm
sewer
improvements. Complete
construc3on
of
Smith
Road
(now
a
gravel
surface)
to
open
up
an
area
for
development














549,000
 












925,000
 












500,000


15 26 14














750,000


21

Diamond

IL

CDBG












1,000,000


28

Diamond

IL

CDBG












2,435,000


68

East
Brooklyn

IL

CDBG

Complete
reconstruc3on
of
Will
Road
with
intersec3on
improvements
at
Division
Street.

Will
open
an
area
for
 development
in
this
rapidly
growing
community. Construc3on
of
new
water
treatment
plant
to
consolidate
and
remove
elevated
levels
of
radium
in
the
water
 supply. Storm
sewer
improvements














150,000


4

East
Brooklyn

IL

CDBG

Street
repairs

Elgin Elgin Elgin Elgin Elgin Elgin Elgin Elgin Elgin Elgin Elgin Elgin Evanston Evanston Evanston Evanston Evanston Evanston Evanston Evanston Evanston

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Kimball
Street
Resurfacing McLean
Blvd
Resurfacing Big
Timber
Road
Resurfacing South
Street
Reconstruc3on Spartan
Drive
Reconstruc3on Villa
Street
Resurfacing/Rechanneliza3on Riverside
Drive
Deck
Replacement Neighborhood
Street
Rehabilita3on Kimball
Street
Dam
Repairs Highland
Combined
Sewer
Sepera3on Route
20
Watermain
Construc3on Airlite
Treatment
Plant
Rehabilita3on Mason
Park
‐
Community
park
landscaping
improvements Fire
Sta3on
#1
‐
1332
Emerson
‐
Replacement
of
windows Levy
Senior
Center
‐
Renova3ons
to
install
gymnasium
draperies Hobart
Park
‐
Neighborhood
park
and
playgound
renova3on Brummel‐Richmond
Park
‐
Neighborhood
park
and
playground
renova3on Fireman's
Park
‐
Neighborhood
park
and
playground
renova3on Fleetwood‐Jourdain
Community
Center
‐
renova3ons
to
arts
and
crabs
room
and
gymnasium
roof. Police/Fire
Firing
Range
‐
renova3on
of
Police
firing
range Harbert
Park
‐
Community
park
improvements














150,000
 












500,000
 












500,000
 










1,000,000
 










1,500,000
 










3,000,000
 










3,000,000
 








11,000,000
 








10,000,000
 










2,000,000
 










4,500,000
 










2,000,000
 








14,000,000
 














50,000
 












100,000
 












100,000
 












250,000
 












300,000
 












350,000
 












400,000
 












450,000


4 12 12 20 20 30 30 80 100 30 35 35 100 0.5 1 1 2.5 3 3.5 4 4.5

Evanston Evanston Evanston Evanston Evanston Evanston Evanston

IL IL IL IL IL IL IL

CDBG CDBG CDBG CDBG CDBG CDBG Energy

Philbrick
Park
‐
Neighborhood
park
and
playground
renova3on Twiggs
Park
‐
Community
park
pathway
and
landscaping
improvements Foster
Field
‐
Community
park
football/sobball
field
renova3ons
and
landscaping. Civic
Center
‐
replacement
of
roof
at
Evanston's
Municipal
Government
Civic
Center James
Park
‐
Community
park
ligh3ng
and
electrical
system
upgrades,
parking
lot
renova3ons,
athle3c
field
 Crown
Center
‐
Community
Center
and
ice
complex
renova3ons
to
meet
building,
life
safety
and
ADA
code
 Complete
energy
efficient
ligh3ng
upgrade
at
the
Municipal
Service
Center.














500,000
 












500,000
 












800,000
 










2,000,000
 










2,700,000
 










3,000,000
 








10,000,000


5 5 8 20 27 60 100














104,000


1

Evanston

IL

Energy

Installa3on
of
solar
panels
at
Fire
Sta3on
#1
‐
1332
Emerson
and
Fire
Sta3on
#4
‐
1817
Washington.
















30,000


1

Evanston

IL

Streets/Roads














275,000


6

Evanston

IL

Streets/Roads

Bridge
Rehabilita3on
‐
Isabella
Street
over
the
North
Shore
Channel
‐
joint
replacement,
patching,
deck
and
 approach
overlay
‐
contract
documents
can
be
out
in
90
days. Construc3on
of
block
curb
and
sidewalk
and
ADA
ramps
at
various
loca3ons
Citywide














600,000


6

Evanston

IL

Streets/Roads

Maple
Avenue
Streetscape
Project
‐
Design
Complete
‐
Clark
to
Church
Street

Evanston Evanston Evanston

IL IL IL

Streets/Roads Streets/Roads Streets/Roads

6 7 8












1,150,000


10

Evanston

IL

Streets/Roads












2,100,000


15

Evanston

IL

Streets/Roads












4,000,000


22

Evanston

IL

Water

Central
Street
Signal
Upgrade
Project
‐
Design
Complete
‐
Signal
upgrades
of
Central/Ridge
and
Central/Girard. Public
Alley
Paving
Projects
‐
7
alleys
‐
design
in
process. Bridge
Rehabilita3on
‐
Central
Street
over
the
North
Shore
Channel
‐
substructure
repair,
deck
patching,
beam
 repairs
‐
contract
documents
can
be
out
in
90
days. Chicago
Avenue
Streetscape
Project
‐
Design
Complete
‐
Lee
to
Greenleaf
(east
side)
and
Main
to
South
Blvd.
 (west
side). Citywide
Street
Resurfacing
Program
‐
Design
complete
in
January
2009
on
resurfacing
18
streets
throughout
 the
City. Tuckpoin3ng
of
Water
Plant
Pumping
Sta3on














350,000
 












540,000
 












800,000















250,000


3

Evanston

IL

Water

Rehabilita3on
of
underdrain
and
media
composi3on
of
filters
19
through
24.












2,500,000


8

Evanston

IL

Water

Water
Main
Replacement
‐
Design
Complete
on
3,500
linear
feet
of
water
main
throughout
the
City.












1,500,000


10

Evanston

IL

Water

Installa3on
of
the
Emergency
Interconnect
with
the
Village
of
Wilmefe.












1,400,000


14

Evanston

IL

Water

Purchase,
installa3on
and
implementa3on
of
the
Supervisory
Control
and
Data
Acquisi3on
(SCADA)
system.












1,500,000


14

Frankfort

IL

CDBG

LaGrange
Road
Sidewalk














200,000


15

Frankfort

IL

CDBG

Frankfort
Square
Sewer
Lining

Frankfort Frankfort Frankfort Frankfort Frankfort Frankfort Frankfort Frankfort Gardner Gardner Gardner Glendale
Heights Glendale
Heights Glendale
Heights

IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG

LaGrange
Rd
Sidewalk Village‐wide
Resurfacing Golf
Ln/Hackberry
Watermain
Replacement Connec3cut
Hills
Watermain
Replacement Connec3cut
Hills
Watermain
Replacement
B Connec3cut
Hills
Watermain
Replacement
C SW
Quad
Water
Tower 80th
Ave
Wells
&
Iron
Removal Replace
deteriorated
and
undersized
mains
to
provide
safe
water
supply
to
residents. Storm
sewer
improvements Street
repairs Lynn
Court
Landscaping Pearl
Avenue
Landscaping Lynn
Court
Sanitary
Sewer
R&R












2,000,000
 












200,000
 










1,200,000
 












600,000
 










1,000,000
 










1,000,000
 










1,000,000
 










2,500,000
 










3,300,000
 












400,000
 












400,000
 












400,000
 















5,000
 














13,000
 














14,750


40 10 30 25 40 40 40 40 50 11 11 11 0.2 0.5 0.6

City

State

Program

Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glendale
Heights Glenview Glenview Glenview Glenview Glenview Glenview Glenview Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Glenwood Grand
Ridge Granite
City Granite
City

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Schools Schools Schools Schools Schools Schools Schools Streets/Roads Streets/Roads Water Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG Streets/Roads Streets/Roads

Granite
City

IL

Streets/Roads

Granville

IL

CDBG

Harvey

IL

Transit

Sidney
Avenue
Landscaping Pearl
Avenue
Sanitary
Sewer Police
Department
ADA
Ramp Sidney
Avenue
Sanitary
Sewer
R&R Lynn
Court
Roadway
Reconstruc3on Pearl
Avenue
Roadway
Reconstruc3on Cambria
Park
Rehabilita3on Sidney
Avenue
Roadway
Reconstruc3on Civic
Center
Parking
Lot
Expansion
and
ADA
Improvements Senior
Ci3zen
Center Sports
Hub
ADA
Improvements Police
Squad
Car
Video
Cameras
(10) Red
Light
Cameras/Technology One
Addi3onal
Police
Officer Red
Light
Camera
Monitoring Dist.
15/Safety
Improvement
‐
Reskin
School Dist.
16/50
Document
Cameras
for
instruc3onal
areas Dist.
15/Emergency
Intercom
System
‐
Reskin
School
&
Winnebago Dist.
16/LCD
Projectors
in
34
Instruc3onal
Areas Hardware
for
connec3on
between
Learning
Center
&
District
WAN Dist.
16/Upgrade
36
Bathrooms 196
HP
Computerers
(or
like),
10
LCD
Projectors
&
Smartboards
for
Computer
Labs Dist.
15/Building
Renova3ons
‐
Winnego
School Parking
Lot
Improvements
‐
4
Buildings 2010
Local
Road
Projects 2009
Local
Road
Projects Bloomingdale
Road
Sewer
Replacement
Project WPCF
Ter3ary
Filter
Replacement
Project Baxter
Ped
Trail Glenview/Washington
Signaliza3on Ped
Signal
Upgrades Glenview
and
Central
Road
Resurfacing Sanitary
Sewer
Lining E.
Bank
Stabiliza3on Storm
Sewer
Lining Main
Street
public
safety
site
development Street
sign
replacement
program ADA
compliance
sidewalk
replacement
program Estates
area
resurfacing Original
Glenwood
area
resurfacing Forest
area
resurfacing Brookwood
Point
area
resurfacing Manor
area
resurfacing Glenwoodie
entrance
road
improvement Fairways
road
improvement
‐
Phase
1 Water
valve
exercise
&
leak
detec3on
program Water
valve
replacement
‐
Forest
area Watermain
replacement
on
Willow
from
Center
to
Clark Prepratory
cleaning
&
internal
sewer
television
inspec3on Village
wide
ouzall
replacements Arquilla
Park
flood
relief Water
looping
‐
Industrial
Park
to
Glenwoodie Fire
Hydrant
extensions
&
replacements Water
Valve
replacement
program Forest
Area
Ouzall
Replacement Sewer
lining
Glenwood‐Chicago
Heights
Road Water
looping
‐
Fairways
to
1
MG
reservoir Estates,
Manor
&
Forest
areas
manhole
rehabilita3on Water
looping
‐
Komer
pump
sta3on
to
industrial
park Forest
area
watermain
replacement Arquilla
Dr
Elevated
Tank
Pain3ng Main
St
forcemain
replacement Original
Glenwood
flood
relief Construct
new
well
and
water
treatment
for
the
purpose
of
removing
elevated
levels
of
arsenic
in
the
water. St.
Clair
Avenue
Extension Maryville
Road
Reconstruc3on‐This
project
consists
of
patching
and
resurfacing
of
Maryville
Road
from
Illinois
 Route
162
to
Illinois
Route
203.

Maryville
Road
is
an
exis3ng
4‐lane
roadway.

The
length
of
this
improvement
 is
19,520’.

 Cleveland
Ave
&
21st
St.‐This
project
consists
of
the
reconstruc3on
of
Cleveland
Avenue
from
16th
Street
to
 Niedringhaus
Avenue
and
the
reconstruc3on
of
21st
Street
from
Edwardsville
Road
to
Monroe
Avenue.

Both
 Streets
are
2‐lane
roadways. Construc3on
project
to
permanently
separate
storm
and
sanitary
sewers
in
cri3cal
parts
of
the
Village.

This
 will
eliminate
back‐ups
of
raw
sewage
into
resident's
homes.
 Pavement
Resurfacing
Spaulding
Street
from
147th
Street
to
145th
Street

Project
Descrip3on

Harvey

IL

Transit

Pavement
Resurfacing
Ashland
Avenue
from
144th
Street
to
147th
Street

Harvey Harvey

IL IL

Transit Transit

Pavement
Resurfacing
Calumet
Blvd.
from
Halsted
to
Park
Avenue Pavement
Resurfacing
167th
Street
from
Lathrop
to
Halsted

Funding
Required 














23,000
 














38,900
 














40,000
 














70,750
 












118,500
 












325,650
 












375,000
 












620,000
 










1,420,000
 










1,614,600
 










1,700,000
 














55,000
 














96,000
 














80,000
 














67,000
 















5,000
 














42,000
 














60,000
 












120,000
 














43,000
 












500,000
 












200,000
 












600,000
 










1,200,000
 










3,300,000
 










4,700,000
 












620,000
 










3,209,000
 












140,000
 












300,000
 












515,000
 










3,500,000
 












100,000
 












230,000
 












400,000
 










1,850,000
 














50,000
 














75,000
 












100,000
 












100,000
 












225,000
 












275,000
 












275,000
 










4,500,000
 










5,000,000
 














50,000
 














50,000
 












200,000
 












150,000
 














50,000
 












125,000
 












950,000
 












200,000
 












175,000
 












200,000
 












250,000
 












275,000
 












350,000
 












750,000
 












500,000
 












450,000
 












425,000
 










1,750,000
 










1,180,000
 










2,750,000


Jobs

1 1.5 2 2.8 4.7 13 15 24.8 25 27 27 0 0 1 1 0 2 2 2 4 6 15 20 150 188 25 50 4 4 5 17 3 4 4 22 2 4 4 4 8 10 10 15 20 3 3 4 5 5 6 6 7 7 8 8 10 11 12 14 15 15 22 33 70












4,900,000


100












4,025,000


120














545,000


15














260,000


9














390,000
 












415,000
 












520,000


13 14 17

City

State

Program

Harvey Harvey Harvey Harvey Harvey Harvey Harvey Harvey Harvey Hennepin Hickory
Hills Hickory
Hills

IL IL IL IL IL IL IL IL IL IL IL IL

Transit Transit Transit Water Water Water Water Water Water CDBG Public
Safety Public
Safety

Hickory
Hills

IL

Streets/Roads

Neighborhood
Street
Ligh3ng
Wood
Street
147th
Street
to
159th
Street Pavement
Resurfacing
167th
Street
from
Lathrop
to
Center Pavement
Resurfacing
Robey
Street
from
147th
Street
to
155th
Street Concrete
Water
Reservoir
500,000
gallons
interior
and
exterior
repain3ng Concrete
Water
Reservoir
4,000,000
gallons
interior
and
exterior
repain3ng Concrete
Water
Reservoir
5,000,000
gallons
interior
and
exterior
repain3ng Water
Valve
Replacement
8"
inch
25
each Concrete
Water
Reservoir
5,000,000
gallons
interior
and
exterior
repain3ng Water
Valve
Replacement
6"
inch
50
each Construc3on
of
enhancements
to
large
wetland
area
including
canoe
access,
bike
paths,
foot
bridge,
 Purchase
of
a
Special
Response
Team
Command
Vehicle.

This
vehicle
will
be
designed
for
use
by
the
 Crea3on
and
implementa3on
of
a
Community
Service
Officer
Program.
These
non
sworn
civilian
personnel
 would
be
responsible
for
support
func3ons
such
as
parking
enforcement
and
arrest
processing.

This
would
 free
up
significant
3me
for
sworn
police
offi City
wide
sidewalk
replacement

Project
Descrip3on

Hickory
Hills

IL

Streets/Roads

City
wide
resurfacing
program

Hickory
Hills Hickory
Hills Hickory
Hills Hickory
Hills Hickory
Hills Hickory
Hills Highland
Park Highland
Park Highland
Park Highland
Park Highland
Park Highland
Park

IL IL IL IL IL IL IL IL IL IL IL IL

Water Water Water Water Water Water Energy Energy Energy Energy Streets/Roads Streets/Roads

Sanitary
Sewer
Lib
Sta3on
Elimina3on Kean
Avenue
Water
Main
Extension Deten3on
Pond
Enhancement/Storm
Water
Pollutant
Elimina3on Sanitary
sewer
cured‐in‐place
lining 85th
Avenue
Storm
Sewer Lib
Sta3on
Replacement Energy
Retrofits
for
All
Government
Buidlings Energy
Retrofits
for
All
School
Buildings Energy
Retrofits
for
Public
Library Electrical
upgrades
in
Central
Business
District
from
110V
to
220V
electric
to
reduce
energy
consump3on
for
 Improvements
to
Route
41
pedestrian/bicycle
overpass. Ravine
Drive
bridge
improvements.

Highland
Park

IL

Streets/Roads

Repaving
of
Sheridan
Road
and
minor
sewer
repairs.

Highland
Park

IL

Streets/Roads

Highland
Park

IL

Streets/Roads

Highland
Park

IL

Water

Repair
of
exis3ng
City
sidewalks
and
extension
of
greenways.

Installa3on
of
extensions
or
new
paths
for
 pedestrians
and
cyclists,
providing
alterna3ves
to
motor
vehicles. Resurface
12
‐
14
miles
of
City
thus
raising
streets
with
pavement
condi3ons
of
poor/fair
to
good
(75+
PCI
on
a
 scale
of
0
‐
100). Sanitary
sewer
main
and
sanitary
manhole
lining

Highland
Park

IL

Water

Targeted
sanitary
sewer
main
"spot'
repairs

Highland
Park

IL

Water

Highland
Park

IL

Water

Highland
Park

IL

Water

Ravine
improvements
such
as
check
dams
or
other
erosion
control
measures
where
public
infrastructure
 systems
are
located
in
the
ravine. Replace
residen3al
water
meters
with
smaller,
radio
head
technology
to
reduce
waste
and
encourage
 conserva3on. Installa3on
of
micro‐filtra3on
membranes
for
City's
Water
Treatment
plant
serving
65,000
customers.

Highland
Park

IL

Water

Storm
sewer
priori3es

Hoffman
Estates

IL

Energy

Hoffman
Estates

IL

Streets/Roads

Hoffman
Estates

IL

Water

Hoffman
Estates

IL

Water

Hoffman
Estates

IL

Water

Hoffman
Estates

IL

Water

Hoffman
Estates

IL

Water

Hoffman
Estates

IL

Water

Homer
Glen

IL

Streets/Roads

Rehabilitate
exisitng
light
system
components
at
the
Public
Works
facility
to
reduce
energy
consump3on.

 Project
is
ready
to
bid.

 Street
Reconstruc3ons Descrip3on:
Several
streets
in
Hoffman
Estates
are
in
very
poor
condi3on
and
in
need
of
full
reconstruc3on. These
streets
include: ∙
Hassell
Road
from
Barrington
to
Hun3ngton,
including
culverts
($3.5
M) ∙
Berkley
Lane
from
 Business
District
Stormwater
Culvert
Replacement Descrip3on:
Construc3on
of
a
48
inch
diameter
storm
sewer
to
correct
a
long‐standing
drainage
problem
 caused by
undersized
pipes
in
poor
condi3on.
The
lack
of
capacity
causes
two
state
arterials
to
be
 Jones/Highland
Stormwater
Improvement Descrip3on:
Construc3on
of
a
48
inch
diameter
storm
sewer
to
correct
a
long‐standing
drainage
problem
 shared between
three
agencies.
Two
collector
roads
in
Hoffman
Estates
are
under
water
for
days
aber
a
heavy
ra Rehabilita3on
and
Reconstruc3on
of
the
Barrington
Square
Sanitary
Lib
Sta3on Descrip3on:
The
Lib
Sta3on
shows
serious
corrosion
of
the
piping,
valves,
pumps,
wet
well
and
dry
well structures.
The
rehabilita3on
project
includes
the
conversion
of
 Replace
6,800
feet
of
Failing
Water
Main Descrip3on:
Project
is
to
replace
approximately
6,400
feet
of
failing
16
inch
water
transmission
main
on
Ela Road
star3ng
at
its
intersec3on
with
Central
Road
and
ending
at
its
intersec3on
with
Algonquin
Road Sanitary
Sewer
Rehabilita3on
Program Descrip3on:
This
mul3phase
project
has
been
in
progress
for
over
8
years
in
Parcel
A,
Parcel
B,
Parcel
C
and the
Highland
areas.
Phase
I
included
engineering
studies
to
inves3gate
pipe
deficiencies
and
to
define
 Water
Tower
Project Descrip3on:
It
has
been
determined
through
Western
Area
water
system
studies
that
a
second
water
tower
is needed
in
the
this
por3on
of
the
Village.
A
second
water
storage
tank
is
necessary
to
correct
insufficient
 storage capacity
 Sidewalk
Replacement

Homer
Glen

IL

Streets/Roads

Local
Road
Flood
Control

Homer
Glen Homer
Glen Homer
Glen Homer
Glen Homewood Kangley

IL IL IL IL IL IL

Streets/Roads Streets/Roads Water Water Water CDBG

Road
Connec3vity Street
Resurfacing Sewer
Lining
‐
Various Fiddyment
Creek
Sanitary
Sewer Water
and
Sewer
Infrastructure
Rehabilita3on:
Baxter
&
Woodman
Engineering
is
finalizing
their
preliminary
 Construc3on
of
new
storm
water
drainage.

Funding
Required 












600,000
 












800,000
 












900,000
 














90,000
 












250,000
 












290,000
 












275,000
 












330,000
 










3,200,000
 












450,000


Jobs 20 27 30 5 10 10 10 15 17 90 0
















41,000


2














375,000


13












4,696,000
 












150,000
 












250,000
 












500,000
 












750,000
 












800,000
 












900,000
 










1,000,000
 










1,000,000
 










1,000,000
 












500,000
 












300,000


157 5 8 13 20 21 30 12 12 12 19 12














800,000


22












1,500,000


24












1,000,000


32












3,000,000


37












2,000,000


12












1,000,000


12














400,000


17












3,800,000


17












7,400,000


22












3,000,000


27
















25,000













6,900,000


30












1,000,000


5












1,200,000


5












1,000,000


5












1,300,000


7












1,400,000


7












4,600,000


12














250,000


10














150,000
 












400,000
 










1,200,000
 












500,000
 










5,400,000
 








22,000,000
 












135,000


25 25 40 20 500 100 5

City

State

Program

Kinsman

IL

CDBG

Street
improvements

Project
Descrip3on

Lansing

IL

Airport

Lansing

IL

CDBG

Lansing
Municipal
Airport
‐
Relocate
overhead
u3li3es
undgerground
on
Glenwood‐Lansing
Road
from
 Burnham
Avenue
to
the
IL/IN
State
Line
in
order
to
increase
sight
distance
and
create
a
clear
runway
 protec3on
zone. Street
Ligh3ng
Upgrades

Lansing

IL

Streets/Roads

Street
Resurfacing

Lansing Lansing Lansing Lansing LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle LaSalle Leland Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lombard Lostant Lostant Lynwood

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Water Water Water CDBG CDBG CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Water Water Streets/Roads

Sanitary
Sewer
Lining
 Interior
and
exterior
pain3ng
of
Chicago
Ave
water
tank Interior
and
exterior
pain3ng
of
170th
St
water
tank Structural
Repairs
to
Water
Reservoirs Bath
House
Window
Replacement Park
Ligh3ng
Replacement Bath
House
Parking
Lot
Reconstruc3on Street
Sign
Replacement
Project Sidewalk
Replacement
&
ADA
Ramp
Construc3on Gunia
Drive
Reconstruc3on Sterling
Street
Reconstruc3on 2009
Street
Overlays Large
Water
Meter
Replacement
Project Wellfield
VFD
Installa3on Backup
Generator
Installa3ons Campbell
Sanitary
Sewer
Replacement Civic
Elevated
Water
Tank
Pain3ng Illinois
Cement
Water
Main
Extension North
System
Water
Transmission
Line Replace
Aera3on
Bay
Walkways Route
6
Water
Main
Extension TIF
III
Sanitary
Sewer
Extension East
End
Wastewater
Treatment
Plant Construc3on
storm
sewer
in
northeast
sec3on
of
community. PW
Emergency
Response
Vehicle Sewer
Lining
Program Civic
Center
Reservoir
Pump
Rehabilita3on GIS
Upgrades Old
Towne
Lib
Sta3on
Pump
Upgrade Village
Hall
Public
Restroom
Remodel(s) Fire
Sta3on
#2
Storage
Building/Garage Great
Western
Trail
Ligh3ng
Project General
Local
Street
Resurfacing Village
Hall
Parking
Lot
Expansion Construc3on
of
Salt
Dome Traffic
Signal
&
Intersec3on
Improvements
(Madison/SR
53) Wells
Corridor
Infrastructure Construc3on
of
a
Public
Works
Facility YMCA
Construc3on Construct
new
water
mains
to
replace
deteriorated
and
undersized
mains.This
will
provide
for
befer
fire
 Construct
new
deep
water
well
to
meet
IEPA
requirements
for
well
capacity
for
source
water
to
residents.

The
 Lake
Lynwood
area
resurfacing

Lynwood

IL

Streets/Roads

Lynwood
Terrace
area
resurfacing

Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Lynwood Manhafan Manhafan Manhafan Manhafan Manhafan Manlius Mark Mark

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG Water Water Water Water Water CDBG Water

Water
valve
exercise
&
leak
detec3on
program Glenwood‐Dyer
water
loop
‐
King
Arthur
to
2449
Glenwood‐Dyer Replacement
of
Lake
Lynwood
water
main
crossing Torrence
water
loop
‐
Bilstone
to
Glenwood‐Dyer Torrence
water
loop
‐
Nichols
to
~199th
St. Elevated
tanks
1
&2
renova3ons Reten3on
expansion
for
Sonstead
Farms
&
Haven
Estates
areas Village
wide
sanitary
sewer
manhole
rehabili3ons
program Glenwood‐Dyer
water
loop
‐
Rt
30
to
Dyer Glenwood‐Dyer
water
loop
Camelot
to
Stony Flood
relief
sewer
for
Sonstead
Farms
&
Haven
Estates
areas Glenwood‐Dyer
sanitary
sewer
extension West
side
water
storage Manhafan
Rd
Sidewalk
Extension Water
Tower
Demoli3on Downtown
Manhole
Repairs Downtown
Sewer
Lining Well
#6
Upgrade
&
Radium
Removal
Facility Construct
new
wastewater
collec3on
and
treatment
system
in
a
presently
unsewered
community. Widen,
remove,
and
replace
pavement
structure,
construct
new
sewers
and
curb,
and
gufers

on
Hennepin
 Construc3on
of
new
water
well
and
replacement
of
undersized
deteriora3ng
mains.

Marseilles

IL

CDBG

Marseilles

IL

CDBG

Marseilles

IL

Streets/Roads

I
&
M
Canal
drainage
improvements
to
control
stormwater
overflows
that
seriously
affect
a
major
(75
jobs)
 local
industrial
employer.
The
Company
will
expand
(20
more
jobs)
provided
the
City
eliminate
the
floodind
 problem. Extend
water,
sanitary
sewer
and
an
access
road
to
serve
an
available
vacant
prime
150
Acre
industrial
site
 bordered
by
the
CSX
Railroad
&
the
Illinois
River
with
barge
access.
(Kelly
Property) Sidewalk
construc3on
‐
Along
County
Highway
15
from
Bluff
Street
to
11
th
Street
to
provide
walking
access
 from
the
main
business
district
to
a
developing
business
area.

Funding
Required 












150,000


Jobs 3














750,000


20














650,000


17












2,850,000
 










6,000,000
 












527,000
 












562,000
 












878,000
 














25,000
 














90,000
 












200,000
 












400,000
 










1,000,000
 












450,000
 












250,000
 










3,000,000
 














20,000
 












200,000
 












100,000
 














50,000
 












750,000
 












150,000
 










1,500,000
 












200,000
 












100,000
 










1,000,000
 










9,500,000
 












500,000
 














60,000
 












500,000
 












300,000
 












350,000
 












325,000
 














41,000
 














60,000
 










1,000,000
 










2,000,000
 












300,000
 










1,100,000
 










4,100,000
 










1,100,000
 








13,000,000
 










4,000,000
 












225,000
 












685,000


70 150 14 15 23 5 6 10 10 20 30 30 40 3 6 10 10 10 10 14 15 15 20 100 14 3 4 6 6 6 6 8 12 15 22 30 30 40 120 120 6 18














325,000


12














350,000
 














75,000
 












100,000
 












100,000
 












150,000
 












150,000
 












150,000
 












150,000
 












250,000
 












400,000
 












325,000
 












350,000
 












950,000
 










2,000,000
 












150,000
 














85,000
 












150,000
 












750,000
 










4,000,000
 










3,800,000
 










1,100,000


12 3 4 4 4 4 5 6 8 10 10 12 16 18 10 2 10 30 130 106 31














275,000


10














850,000


18












1,600,000


20














200,000


10

City

State

Program

Marseilles

IL

Streets/Roads

Marseilles

IL

Streets/Roads

Marseilles

IL

Streets/Roads

Marseilles

IL

Water

Marseilles

IL

Water

Marseilles

IL

Water

Marseilles

IL

Water

Marseilles

IL

Water

Marseilles

IL

Water

Marseilles

IL

Water

Mafeson

IL

Streets/Roads

Lincoln
Street
‐
Aurora
to
Chicago
&
Chicago
‐
Lincoln
to
Bluff
St.
remove
&
replace
curbs,
resur.face,
storm
 drainage
improvements,
and
rail
crossing
approach
improvements. Best
Street
then
Pomeroy,
Bond,
Armstrong
&
Sample
Street
Improvements
‐also
Fillebrown
Street
‐
 Reconstruct
streets
by
building
a
completely
new
base
adding
curb
&
gufers,
storm
sewers,
sidewalks
and
 Stromwater
deten3on
basins
‐
Construct
deten3on
basins
in
four
loca3on
to
eliminate
flooding
in
the
lower
 areas
of
town.
In
storms,
water
from
the
bluffs
flow
into
the
valley
areas
causing
widespread
flooding
ofg
 Illinois
River
South
Plant
‐
Upgrade
and
replace
the
aerators
in
the
sewage
treatment
lagoon
and
replace
the
 main
STP
lib
sta3on. Grant
Street
‐
Lincoln
to
Washington
Street.
Replace
the
sanitary
sewer
under
the
CSX
railroad
to
eliminate
the
 restric3on
that
causes
sewer
backups
to
several
hundred
homes. Radium
Removal
from
drinking
water
&
adding
emergency
generators
to
three
exis3ng
wellhouses
for
system
 north
of
the
Illinois
River.
Project
has
been
issued
an
IEPA
construc3on
permit. Young
Street
‐
Replace
the
sanitary
sewer
from
Young
Street
to
Commercial
street
just
west
of
the
swimming
 pool.
The
sewer
is

located
under
a
creek
and
has
serious
alignment
and
leakage
problems.
800
+/‐
lineal
feet
 of
30"
sanitary
sewer.
 Wallace
Street
‐
Replace
the
sanitary
sewer
from
Aurora
Street
to
Liberty
street.
The
sewer
is
made
of
"buf"
 joint
clay
3le
and
is
a
major
source
of
infiltra3on
into
the
sewer
system.
The
sewer
is
located
undr
the
street
 and
the
replacement
will
also
r Water
and
Sanitary
Sewer
extension
from
11th
Street
north
2
miles
to
Interstate
80
including
a
lib
sta3on
and
 related
work.
Provides
water
&
sewer
facili3es
to
a
500
acre
development
area
at
the
Interstate
80
exit
at
 Marseilles

 Ilinois
River
South
water
system.
Dtrill
a
new
well
as
required
by
the
IEPA
and
add
radium
removal
facili3es
to
 the
exis3ng
south
system
(includes
several
watermain
extensions. Cicero/Mafeson
Intersec3on
improvement.

Project
Descrip3on

Mafeson

IL

Streets/Roads

Cicero/Vollmer
Intersec3on
reconstruc3on
upgrade
per
IDOT
standards.

Mafeson

IL

Streets/Roads

Mafeson
Avenue
Bridge
comple3on.
Construc3on
of
roadway
bridge
to
improve
emergency
service
access.

Mafeson

IL

Water

Mafeson

IL

Water

Mazon

IL

Mazon

Funding
Required

Jobs














900,000


16












1,950,000


20
















80,000


20














600,000


8














380,000


10












2,200,000


15














410,000


15














760,000


18












2,800,000


18












2,600,000


20












2,000,000


10












2,500,000


10














250,000


20

Construc3on
of
a
new
Elevated
Water
Tower
to
meet
needs
of
a
growing
popula3on.












2,000,000


7












1,250,000


7

CDBG

Elevate
Exis3ng
Water
Tower
to
establist
hydraulic
equilibrium
with
another
exis3ng
tower
to
make
water
 delivery
more
efficient. Sanitary
sewer
improvements

IL

CDBG

Street
improvements

Mazon Mazon McNabb McNabb Mineral

IL IL IL IL IL

CDBG CDBG CDBG Water Water

Moline

IL

Amtrak

Replacement
of
old,
undersized
and
deteriora3ng
watermains. Storm
sewer
improvements Construc3on
of
a
new
wastewater
treatment
and
collec3on
system
for
a
community
that
has
no
central
 Construct
new
shallow
water
supply
well
and
connect
to
the
treatment
plant.

Furnish
standby
power
to
supply
 Construc3on
of
new
wastewater
treatment
and
collec3on
system
for
community
that
has
no
central
sanitary
 system Train
Car
Rehabilita3on

Moline

IL

Amtrak

Amtrak
plazorm

Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Amtrak Amtrak Amtrak CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Track
Upgrades
between
Chicago
and
Moline Amtrak
Depot Relocate
siding
to
Silvis CDC
Administra3ve/Startup
Funds Riverfront
High
Speed
Network CDC
Revolving
Construc3on
Loan
Fund
Capitaliza3on 5th
Avenue
Reconstruc3on/Streetscaping Housing
Rehabilita3on
Funds Public
Safety
Sta3on
for
South
of
the
Rock
River Collector
Road
System
Resurfacing Replace
roof
City
Hall Revolving
EECBG
Loan
Fund
for
Private
Building
Retrofits Retrofit
City
Buildings
for
LEED/Energy
Efficiency Pheasant
Ridge
Apts
COP
officer Spring
Brook
Cts
COP
officer Valley
View
COP
officer Middle
&
High
School
officers Police
Officers Crossing
Guards Police
and
Fire
employees
to
man
sta3on
south
of
Rock
River Allendale
Retaining
Wall
Repairs
‐
A
historically
significant
retaining
wall,
built
in
1906,
bordering
a
historic
 H.S.
Electrical
Switchgear
Replacement
‐
This
work
replaces
cri3cal
electrical
switchgear
on
the
main
electrical
 H.S./Cool
Tennis
Court
Improvements
‐
Providing
proper
maintenance
of
surfaces
for
these
P.E.
and
athle3c
 areas
is
a
challenge
in
our
colder
climate.

These
surfaces
require
repair
and
resurfacing
to
keep
them
safe
for
 students. Browning
Field
Ligh3ng
‐
The
field
ligh3ng
is
inadequate,
at
least
40
years
old
and
in
poor
condi3on.

This
 athle3c
field
hosts
football
games,
track
and
field
events
and
soccer
games
for
boys
and
girls
athle3cs. Browning
Field
West
Entrance
Improvements
‐
In
coopera3on
with
the
City
of
Moline
and
Park
Board,
an
effort
 exists
to
provide
an
improved
community
park
area
which
adjoins
the
School
District's
Browning
Field
 Complex.

 Browning
Field
Restrooms
and
Concession
Stands
‐
Currently
the
restrooms
and
concessions
at
Browning
Field
 are
inadequate
for
the
number
of
patrons
using
the
facility
and
offer
very
limited
and
poor
quality
 handicapped
facili3es. H.S.
Soccor
Field
Ligh3ng,
restrooms,
bleachers,
etc.
‐
Compe33on
facili3es
are
at
a
premium
and
scheduling
 conflicts
oben
occur.

The
addi3on
of
these
facili3es
will
improve
access
for
our
2200
H.S.
students. Throughout,
Security
Equipment
Installa3ons
‐
The
District
recently
had
a
crises
management
plan
developed
 and
an
audit
of
our
exis3ng
facili3es
completed.

Recommenda3ons
included
installing
access
control
and
 monitoring
equipment
to
enhance
student















200,000


6














350,000
 












480,000
 












650,000
 










1,220,000
 












375,000


10 14 18 34 11












2,800,000


78












5,600,000


10














550,000
 








22,700,000
 












800,000
 










2,300,000
 












100,000
 












750,000
 










3,000,000
 










6,000,000
 










1,000,000
 










8,000,000
 








30,000,000
 












195,000
 










1,000,000
 










5,000,000
 














58,000
 














58,000
 














58,000
 












180,000
 












540,000
 














30,000
 












600,000
 












100,000
 












360,000


35 50 55 65 2 5 30 50 50 50 210 10 20 100 1 1 1 3 9 10 10 5 8














150,000


10














250,000


12














100,000


14














460,000


15














400,000


35














850,000


35

City

State

Program

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Schools

Moline

IL

Streets/Roads

Throughout,
21st
Century
Classrooms
‐
In
an
effort
to
comply
with
ini3a3ves
consistent
with
developing
21st
 century
classrooms
throughout
the
District,
technology
enhancements
are
required
in
all
District
facili3es.
 Indoor
Air
Quality
and
Classroom
Environment
Retros
‐
Improvements
included
here
will
provide
for
befer
 educa3onal
environments
for
all
of
our
at
risk
preschool
and
high
school
students
as
well
as
the
en3re
 popula3on
of
one
elementary
school
building. Moline
High
School
Hea3ng
&
Cooling
Upgrades
‐
Update
original
1950's
boiler
systems
and
add
geothermal
 hea3ng
&
air
condi3oning
to
provide
proper
learning
environment
for
2,400
students. Browning
Field
Visitor
Bleachers
and
Locker
Facili3es
‐
Visitor
bleachers
are
in
excess
of
30
years
old,
are
 inadequate,
are
not
handicapped
accessible
and
do
not
meet
current
safety
codes. Moline
High
School
Community
Center
‐
Build
a
new
Community
Center
to
include
3
compe33on
size
gyms,
 weight
room
facility,
an
indoor
running
track
and
Olympic
size
swimming
pool. John
Deere
Middle
School
Addi3on
‐
Add
on
to
exis3ng
middle
school
to
enlarge
capacity
to
include
6th
 graders
(currently
only
housees
7th
&
8th
grades).

Would
allow
for
exis3ng
elementary
buildings
to
free
up
 classroom
space
to
lower
class
size
 Wilson
Middle
School
Addi3on
‐
Add
on
to
exis3ng
middle
school
to
enlarge
capacity
to
include
6th
graders
 (currently
only
houses
7th
&
8th
grades).

Would
allow
for
exis3ng
elementary
buildings
to
free
up
classroom
 space
to
low
class
size River
to
River
Mul3‐Use
Trail
Construc3on

Project
Descrip3on

Moline

IL

Streets/Roads

Valley
View
Village
(42nd
Ave
and70th
St.
extensions)

Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Moline Morris Morris Morris Morris

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Water Water Water Water Water Water Water Water Airport CDBG CDBG CDBG

Rock
River
Boulevard John
Deere
Rd
rebuild I
‐74
Bridge
replacement Buses
for
Metro Centre
Sta3on
Enhancement
for
Rail 19th
st
pedestrian
corridor Wastewater
Repairs/Improvements Water
Main
Loops
to
Eliminate
Dead
End
Lines Rpl
storm
in
1st
St Rpl
sewer
main
in
5th
Ave Rpl
water
main
in
5th
av Valley
View
Village
(sewer
and
water
extensions) Water
Tower
and
Main
Network
South
of
Airport Main
upgrades
&
Replacement Expansion
of
runway
to
the
north
and
purchase
of
property. Remove
and
replace
bridge
deck
to
address
serious
deficiencies
in
Shaky
Bridge
over
west
fork
of
Nefle
Creek Sanitary
sewer
extension Street
repairs

Morris Morris Naplate Neponset

IL IL IL IL

CDBG CDBG Water Water

Niles

IL

CDBG

Water
treatment
system
improvements Industrial
Development
Enhancement
to
extend
municipal
water
and
construct
truck
access
route
for
 Construct
new
water
treatment
plant
to
reduce
the
radium
level
to
within
acceptable
standards
in
the
Village's
 Construct
new
water
treatment
plant
well
for
the
purpose
of
removing
elevated
levels
of
radium
from
the
 water
supply. Retrofit
Efficient
Ligh3ng

Niles

IL

CDBG

New
Fire
Sta3ons
(2)

Niles Niles Niles Niles Niles Niles Niles

IL IL IL IL IL IL IL

Energy Housing Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Retrofit
Energy
Efficient
Ligh3ng Rehab
Local
Affordable
Housing First
Responder
Training Bus
Rapid
Transit
(dedicated
lanes
and
signaliza3on) Corridor
Ligh3ng
Improvement.

the
Village
of
Niles
proposes
the
pain3ng
of
108
street
light
poles
from
 Crosswalk
at
Jerry's
Fruit
Market
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
this
 Greendale
Avenue
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
 which
will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is
Greendale
Avenue
 from
Prospect
Street
to
Oakton
Street. Oak
Lane
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
will
 include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:Oak
Lane
from
Prospect
Street
 to
West
End.

 Prospect
Court
Resurfacing.The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
will
 include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:Prospect
Court
from
Prospect
 Street
to
East
End.

 Prospect
Street
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
 will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:
Prospect
Street
from
 Oakton
Street
to
Greendale
Avenue. Courtland
Drive
Resurfacing.
The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
street,
which
 will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
street
is:
Courtland
Drive
from
 Church
Street
to
Lyons
Street.

 Riverside/Days
Alley
Reconstruc3on.

The
Village
of
Niles
proposes
to
reconstruct
the
alley
between
Riverside
 Drive
and
Days
Terrace.

This
is
a
distance
of
approximately
275
feet.

The
subject
alley
has
deteriorated
and
in
 need
of
reconstruc3on. Chesterfield
Area
Resurfacing.

The
Village
of
Niles
proposes
to
resurface
and
patch
the
following
streets,
which
 will
include
sidewalk,
curb
and
gufer
replacement
where
necessary.

The
streets
are:
Main
Street
from
 Shermer
Road
to
Waukegan
Roa Milwaukee
Avenue
and
Harlem
Avenue
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
 this
major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and
 pathways,
as
well
as
Traffic
Signal
Moderniza3 Milwaukee
Avenue
and
Howard
Avenue
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
 this
major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and
 pathways,
as
well
as
Traffic
Signal
Moderniza3on

Funding
Required

Jobs












2,050,000


45














835,000


50










19,000,000


50












5,000,000


75












8,700,000


100










33,000,000


300










24,000,000


300














800,000


20












1,000,000
 










9,555,000
 






200,000,000
 






950,000,000
 










5,200,000
 










1,500,000
 










2,300,000
 










3,000,000
 










3,000,000
 












300,000
 












400,000
 












400,000
 










3,300,000
 










5,000,000
 








10,200,000
 










2,000,000
 












750,000
 










1,000,000


45 100 250 400 25 30 75 20 20 30 40 40 50 100 140 56 21 28












1,000,000
 










1,000,000
 










3,000,000
 










1,000,000


28 28 84 28












1,120,000


31












2,000,000


14










14,000,000
 










3,000,000
 










5,000,000
 










5,000,000
 










3,000,000
 














76,000
 














25,000


91 21














100,000


12
















50,000


12
















50,000


12














130,000


12














230,000


15
















70,000


15














853,000


25














550,000


25














495,000


25

35 21 4 6

City

State

Program

Niles

IL

Streets/Roads

Project
Descrip3on

Niles

IL

Streets/Roads

Niles

IL

Streets/Roads

Niles

IL

Transit

Bus
Rapid
Transit
(Dedicated
lanes
and
signaliza3on)

Niles

IL

Water

Stormwater
‐
Flood
Mi3ga3on

Niles

IL

Water

Niles

IL

Water

Niles

IL

Water

Normal

IL

Energy

Normal

IL

Energy

Normal

IL

Energy

Normal

IL

Energy

Normal

IL

Public
Safety

Niles
Water
System
Safety
Project.

The
Village
of
Niles
proposes
the
implementa3on
of
a
Niles
Water
System
 Security
Plan
that
includes
the
installa3on
of
new
locks,
perimeter
barriers,
alarms,
mo3on
detectors
and
 closed
circuit
television
cameras
at
a Milwaukee
Avenue
Watermain
Replacement The
Village
of
Niles
proposes
to
replace
the
10‐inch
watermain
in
Milwaukee
Avenue
with
a
12‐inch
main
from
 the
transmission
main
at
Waukegan
Road
to
the
12‐inch
loop
on
Albion
Avenue Oakton
Street
Area
Watermain
Improvement
Project.

The
Village
of
Niles
proposes
to
install
a
new
watermain
 along
the
following
route:
 •
Oakton
Street
from
Waukegan
Road
east
to
the
Village
limits.

 •
Caldwell
Avenue
from
Seward
Street
to
Main
Street; Solar
Installa3on
at
the
Children's
Discovery
Museum
‐‐
This
includes
installing
solar
panels
on
the
roof
of
the
 Town's
children's
museum.
The
panels
would
generate
power
for
the
facility
and
also
serve
as
an
educa3onal
 tool
for
the
community. Dayligh3ng
upgrades
at
maintenance
facili3es
‐‐
This
would
include
installing
advanced
dayligh3ng
at
the
 Town's
various
maintenance
buildings.

The
lights
would
eliminate
the
need
for
tradi3onal
electricity
during
 day
light
hours. Solar
Installa3on
at
the
Community
Ac3vity
Center
‐‐
This
includes
installing
solar
panels
at
Normal's
 community
center.

The
panels
would
generate
a
significant
amount
of
power
for
the
building
and
also
be
a
 showcase
in
the
community. The
Underwood
House
‐
Green
Park
Facility
to
demonstrate
solar,
wind,
geothermal,
and
storm
water
 treatment.
Facility
for
Con3nuing
Educa3on
and
loca3on
of
the
Ecology
Ac3on
Center Addi3onal
Patrol
Vehicle
‐‐
An
addi3onal
vehicle
is
needed
to
supplement
the
exis3ng
marked
police
fleet.

Normal

IL

Public
Safety

Normal

IL

Public
Safety

Normal

IL

Public
Safety

Normal

IL

Streets/Roads

Normal

IL

Streets/Roads

Normal

IL

Streets/Roads

Normal

IL

Streets/Roads

Normal

IL

Streets/Roads

Normal

IL

Transit

Normal

IL

Water

Normal

IL

Water

Normal

IL

Water

Normal

IL

Water

Normal

IL

Water

North
Chicago

IL

CDBG

Willow
Street
Road
Improvement
‐‐
This
project
includes
the
reconstruc3on
of
a
heavily
traveled
roadway
in
 Normal Ft.
Jesse
Road
Improvement
‐‐
 This
project
involves
reconstruc3ng
a
heavily
traveled
roadway
in
Normal. Mul3modal
Center
will
provide
a
focus
for
eight
transporta3on
modes
including
(1)
the
city
bus
system,
(2)
 inter‐city
and
charter
buses,
(3)
Amtrak
service
to
Chicago
and
St.
Louis,
(4)
airport
shufles,
(5)
taxis,
(6)
park
 and
ride
facili3es,
(7)
and New
Raw
Water
Transmission
Main‐‐
This
project
consists
of
the
installa3on
of
a
new
sixteen
inch
raw
water transmission
main
that
will
improve
transmission
capacity
as
well
as
replace
an
aging
water
main
that
is
in
 ques3onable
condi3on. Water
Main
Replacement
(David,
Daisy
and
Julienne
Streets)
‐‐
This
project
includes
replacing
an
aging
water
 main
on
the
above
listed
streets. Water
Main
Replacement
(Gregory
Street)
‐‐
This
project
includes
replacing
a
water
main
on
Gregory
Street
 from
Main
Street
to
Adelaide
Street. Elevated
Tank
Pain3ng
‐‐
This
project
includes
the
repain3ng
of
3
elevated
tanks
to
comply
with
federal
 regula3ons. Northeast
Trunk
Sanitary
Sewer
Extension
‐‐
This
project
consists
of
the
extension
of
the
trunk
sanitary sewer
from
the
Airport
Road
pump
sta3on
east
along
Northtown
Road
and
south
along
the
Weber
property.
 The
sewer
extension
will
serve
the
areas
south Brownfields
Cleanup
‐
Sheridan/Broadway
Gas
Sta3on
Site

North
Chicago

IL

CDBG

Brownfields
Cleanup
‐
1901
Sheridan
(abandoned
factory
site)

North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago

IL IL IL IL IL IL IL IL IL IL IL IL

CDBG CDBG CDBG Housing Housing Housing Housing Housing Housing Housing Housing Housing

Brownfields
Cleanup
‐
EMCO/Vacant
Lot Brownfields
Cleanup
‐
Former
Landfill Brownfields
Cleanup
‐
Sheridan
Crossing Public
Housing
‐
Kukla
Towers
‐
Administra3on Public
Housing
‐
Kukla
Towers
‐
Management
Improvements Public
Housing
‐
Kukla
Towers
‐
Miscellaneous
Equipment Public
Housing
‐
Kukla
Towers
‐
Security
Cameras
and
Guards Public
Housing
‐
Kukla
Towers
‐
Dwelling
Equipment Public
Housing
‐
Kukla
Towers
‐
Replace
Power
Rodder Public
Housing
‐
Kukla
Towers
‐
Replace
Public
Flooring Public
Housing
‐
Kukla
Towers
‐
Paint
Hallways Public
Housing
‐
Kukla
Towers
‐
Replace
Carpet

Milwaukee
Avenue
&
Ballard
Road
Intersec3on
Improvement.
 To
improve
traffic
flow
at
the
above
referenced
intersec3on,
one
lane
is
proposed
to
be
added
to
the
east
 approach
of
Ballard
Road,
tapering
back
to
the
current
two‐lane
pavement
 Milwaukee
Avenue
and
Oakton
Street
Intersec3on
Improvement.

The
Village
of
Niles
proposes
to
improve
this
 major
intersec3on
with
pedestrian
safety
features
such
as
Pedestrian
Countdowns,
brick
banding
and
 pathways,
as
well
as
Traffic
Signal
Moderniza3 Touhy
Avenue
Watermain
Replacement
Project.
The
Village
of
Niles
proposes
to
install
a
new
watermain
as
 follows:
Touhy
Avenue
from
Harlem
Avenue
to
Caldwell
Avenue.

This
is
a
distance
of
approximately
5,000
feet.

Airsob
Training
Weapons
Packages
‐‐
These
weapons
assist
officers
during
rapid
deployment
training,
scenario
 based
training,
and
emergency
response
training.
The
package
includes
pistols,
magazines,
charging
sta3ons,
 masks
and

storage
cases. Alternate
Light
Source
‐‐
An
alternate
light
source
is
needed
to
assist
officers
at
crime
scenes
aber
dark.

Funding
Required

Jobs














750,000


30














830,000


30












2,300,000


30












5,000,000


35










15,000,000


95
















52,000


8












1,500,000


15












1,200,000


30
















75,000


5
















60,000


10














130,000


10












1,000,000


35
















31,000


0

















6,000


0

















5,000


0

COPS
Hiring
Grants
‐‐
Funds
are
needed
for
three
officers
to
be
added
to
the
Normal
Police
Department.
The
 number
provided
includes
one
year's
salary
and
equipment. Parkside
Road
Improvement
‐‐
This
project
includes
reconstruc3ng
a
heavily
traveled
roadway
in
Normal.














200,000


3














300,000


15

Towanda
Road
Improvement
‐‐
This
includes
widening
and
improving
an
exis3ng
2
lane
road
into
a
4
lane
road
 to
accomodate
increased
traffic
flows. Vernon
Avenue
Bridge
Replacement
‐‐
Includes
reconstruc3on
of
a
heavily
traveled
bridge
in
Normal.














525,000


20














700,000


20














500,000


20














650,000


25










16,000,000


350














800,000


15














425,000


15














750,000


15












2,000,000


25












2,500,000


30














100,000


10














300,000
 












300,000
 












500,000
 












500,000
 














16,000
 















5,000
 















7,000
 














10,000
 














10,000
 















2,000
 














15,000
 














18,000
 














30,000


20 20 30 30 2 2 2 2 3 4 4 5 6

City

State

Program

North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
Chicago North
U3ca North
U3ca North
U3ca North
U3ca Northbrook Northbrook

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Housing Housing Housing Housing Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water CDBG CDBG CDBG Streets/Roads CDBG CDBG

Public
Housing
‐
Kukla
Towers
‐
Replace
Garage
Doors Demoli3on
of
Blighted
Structures Public
Housing
‐
Kukla
Towers
‐
Replace
Vanity
and
Medicine
Cabinets Public
Housing
‐
Kukla
Towers
‐
Renovate
Community
Rms. In
Squad
Dash
Cameras Warning
Sirens 24th
Street
Street
Light
Installa3on Detector
Loop
Repairs Electronic
Pre‐Emp3on
Device
Repairs 2009
Thermoplas3c
striping Broadway
Avenue
Sidewalk Buckley/Amstutz
Underpass
Street
Light
Installa3on Lakeside
Avenue
Phase
I
Design Infrastructure
Maintenance
System Bike
Path
Extension
(Commonwealth
to
Sheridan) 2009
Resurfacing
Project Wallace
Avenue
Watermain/Roadway
Construc3on
and
Inspec3on Mar3n
Luther
King
Dr
Sewer
&
Watermain
Construc3on
Inspec3on Wadsworth
Ave
Sewer
In
Situ
Form
Lining Sheridan
Crossing
Stormwater
Deten3on
15.3
acre‐feet Booster
Sta3on
Improvements Miscellaneous
Sewer
In
Situ
Form
Linings Lewis/Buckley
12"
Watermain
Construc3on
and
Inspec3on Mar3n
Luther
King
Dr.
Sewer
&
Watermain
Construc3on Clark
Run
Creek
Flood
Control
Project Wastewater
treatment
plant
expansion Radium
removal
plant
for
the
Village
water
system Construc3on
of
new
roadway
through
N.
U3ca
to
eliminate
2
sharp
90‐degree
turns
on
very
busy
truck
route.

 Cedar
Lane
Ouzall
Improvements Elm
Ridge
Culvert
Replacement

Project
Descrip3on

Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Northbrook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook Oak
Brook

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Water Water

Public
Works
Center
‐
Storage
Fence
Replacement Water
Plant
‐
Generator
Replacements Williamsburg
Square
Subdivision
Ouzall
Replacement Midway/Whizield
Intersec3on
Flood
Reduc3on
Improvements Public
Works
Center
‐
East
Wing
Pain3ng Sanitary
Sewer
Force
Main
Replacement Sanitary
Sewer
Lining Storm
Sewer
Lining Techny
Drain
South
Fork
Relief
Sewer
Construc3on Water
Plant
‐
Roof
Replacement Dundee
Road
Bicycle
Facility
Construc3on
‐
Des
Plaines
River
Trail
to
Sanders
Road Lakefront
Pumping
Sta3on
‐
Ravine
Slope
Stabiliza3on Lakefront
Pumping
Sta3on‐
Driveway
Replacement Public
Works
Center
–
North
Driveway
Replacement Skokie
Valley
Trail
Construc3on‐

Lake‐Cook
Road
to
south
Village
limit Techny
Drain
Stormwater
Management
Improvements Water
Main
‐
Chronic
Breaker
Replacement Water
Plant
‐
Conversion
from
Chlorine
Gas
to
Sodium
Hypochlorite Water
Plant
Drive
Replacement Dundee
Road
Water
Main
Replacement
‐
Water
Plant
to
Waukegan
Road Dundee
Road
Water
Main
Replacement
‐
Waukegan
Road
to
Pfingsten
Road Water
Main
–
Construct
Interconnec3on
To
Deerfield
Distribu3on
System Water
Main
–
Construct
Interconnec3on
To
NWWC
Distribu3on
System Waukegan
Road
Bicycle
Facility
Construc3on
‐
Dundee
Road
(Illinois
Route
68)
to
just
north
of
Interstate
94
 Asphalt
Street
Rehabilita3on Concrete
Pavement
Patching Water
Tower
Construc3on Western
Avenue
Trunk
Sewer
Construc3on Revere
Drive
Pavement
Reconstruc3on Fire
Sta3on
#11
Renova3on Overhead
Sanitary
Sewer
Conversion
Program Replace
public
works
roof
with
a
green
alterna3ve Emergency
Siren
System
Upgrade Unified
Interoperable
Communica3ons
and
Alert/No3fica3on
System Add
3
new
full‐3me
officers,
3
community
services
officers,
1
CSO
supervisor Emergency
Opera3ons
Command
Center‐addi3on
to
library Traffic
Cameras
to
allow
befer
traffic
flow
and
reduce
conges3on,
save
fuel West
22nd
Street
Ligh3ng Jorie
Road
Road
reconstruc3on Miscellaneous
roadway
maintenance
projects North
York/Harger
road
rebuilding Purchases
busses
to
take

Oak
Brook
employees
from
nearby
train
sta3ons
to
Oak
Brook
to
reduce
traffic
 1‐88@22nd
St
Water
main
replacement 1‐88@rt.
83
Water
main
replacement

Oak
Brook Oak
Brook Oak
Brook Oak
Park

IL IL IL IL

Water Water Water Streets/Roads

35th
St.
Watermain
project West
22nd
St.
watermain
replacement
project New
ground
storage
tanks Bicycle
Plan
Physical
Infrastructure
Improvements.

Project
area
is
village‐wide
and
would
be
executed
over


Funding
Required 














20,000
 












120,000
 














40,000
 














30,000
 














42,000
 












100,000
 














10,000
 














25,000
 














14,000
 














25,000
 












100,000
 














10,000
 












115,000
 














50,000
 












100,000
 












475,000
 










1,334,000
 












352,700
 














50,000
 










2,300,000
 












150,000
 












400,000
 










1,750,000
 










3,300,000
 










1,500,000
 










1,750,000
 










1,950,000
 










7,500,000
 












120,000


Jobs

6 10 10 15 5 5 4 5 5 10 10 10 10 15 20 30 40 5 5 15 20 20 30 30 42 49 55 210 5














850,000
 














70,000
 












850,000
 












150,000
 












600,000
 












100,000
 












400,000
 












750,000
 












500,000
 










1,000,000
 












600,000
 












600,000
 












145,000
 












185,000
 














50,000
 










1,200,000
 










3,000,000
 










3,600,000
 












750,000
 












250,000
 










3,700,000
 










3,150,000
 










1,500,000
 










3,150,000
 












400,000
 








13,000,000
 










3,000,000
 










3,000,000
 










1,700,000
 










1,000,000
 










5,000,000
 










4,000,000
 












290,419
 














53,800
 












128,619
 












425,000
 










1,280,000
 












200,000
 










1,700,000
 










1,300,000
 










1,700,000
 










5,200,000
 












300,000
 












655,000


5 5 5 5 10 10 10 10 10 10 10 15 15 15 15 15 15 15 15 15 20 20 20 20 20 25 25 25 25 30 45 50 3 2 3 7 7 5 10 40 80 80 5 10














272,000
 












600,000
 










2,000,000
 










5,105,000
 












390,000


10 10 15 25 20

City

State

Program

Oak
Park Oak
Park

IL IL

Streets/Roads Streets/Roads

Green
Alleys.

Project
includes
two
alleys
being
replaced
consistent
with
City
of
Chicago
published
Green
Alleys
 Harrison
Street
Ligh3ng.

Project
area
is
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue.

Project
Descrip3on

Oak
Park

IL

Streets/Roads

Harrison
Street
Resurfacing.

Project
area
is
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue.

Oak
Park

IL

Streets/Roads

Oak
Park

IL

Streets/Roads

Oak
Park

IL

Streets/Roads

East
Avenue
Resurfacing.

Project
area
is
between
Roosevelt
Road
and
Garfield
Street,
including
East
Avenue
 and
Garfield
Street
intersec3on
replacement
and
Fire
Sta3on
driveway. Jackson
Boulevard
Resurfacing.

Project
area
is
between
Aus3n
Boulevard
and
Harlem
Avenue
(en3re
width
of
 Village). South
Boulevard
and
Oak
Park
Avenue
Reconstruc3on.

Including
permanent
streetscape
elements.

Oak
Park

IL

Streets/Roads

Oak
Park

IL

Streets/Roads

Oak
Park

IL

Streets/Roads

Oglesby

IL

CDBG

Remove
and
replace
pavement
structure,
construct
new
storm
sewers
and
curb
and
gufer
on
Dale
Ave.

Oglesby

IL

CDBG

Replace
small
diameter
and
deteriora3ng
cast
iron
and
transite
water
mains.

Oglesby

IL

Water

Oglesby

IL

Water

Construc3on
of
water
tower
and
connec3ng
main
with
electrical
controls
etc.
to
address
lack
of
storage
 capacity. Re‐construct
very
old/failing
treatment
plant
and
renovate
eight
deteriorated
and
hazardous
lib
sta3ons.

Olympia
Fields

IL

Public
Safety

Olympia
Fields

IL

Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields

Harrison
Street
Streetscape.

Project
area
Harrison
Street
between
Aus3n
Boulevard
and
Elmwood
Avenue,
 including
the
Harrison
Street
Arts
District.

Project
includes
sidewalks,
Lombard,
Aus3n
and
Ridgeland
 intersec3ons,
alley
crossings,
curb
bump‐outs, Roosevelt
Road
Reconstruc3on.
Project
area
is
Roosevelt
Road
between
Harlem
and
Aus3n,
including
 necessary
modifica3ons
and
reconstruc3on
in
an3cipa3on
of
increased
traffic
flow
resul3ng
from
major
 reconstruc3on
of
I‐290.
 North
Avenue
Reconstruc3on.

Including
permanent
streetscape
elements.

Project
area
is
between
Oak
Park
 Avenue
and
Aus3n
Boulevard.
This
is
a
joint
project
with
the
City
of
Chicago.

Funding
Required 












250,000


Jobs 20












1,000,000


20














250,000


20














600,000


30












1,300,000


30












1,100,000


40












4,400,000


60










14,000,000


60










11,000,000


75














350,000


10














400,000


11














753,000


21












2,306,000


65

Olympia
Fields
Police
Squad
Car
Acquisi3ons














120,000


4

Public
Safety

Olympia
Fields
Police
Technology
Upgrade

IL IL IL IL IL IL IL

Public
Safety Streets/Roads Streets/Roads Water Water Water Water

203rd
Street
Video
Surveillance
Project‐Homeland
Security Handicap
Sidewalk
Ramp
Installa3ons
Various
Loca3on Olympia
Fields
Road
Resurfacing Suburban
Woods/Arcadia
Manhole
Rehabilita3on 2008
Sanitary
Sewer
Manhole
Rehabilita3on
in
Graymoor
and
Hawthorne
Hills
Subdivisions Watermain
Valve
Replacements Athena
Park/Olympia
Woods
Manhole
Rehabilita3on














120,000
 












300,000
 












155,000
 












500,000
 












220,000
 












260,000
 












175,000


4 10 5 38 7 9 9

Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields Olympia
Fields

IL IL IL IL IL IL IL

Water Water Water Water Water Water Water

Environmental
enhancement
of
Graymoor
ponds Elevated
Tank
Pain3ng
East
Tower Country
Club
Drive
Sewer
Extension Dredging
of
Graymoor
ponds Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Graymoor
and
Hawthorne
Subdivisions Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Suburban
Woods
and
Arcadia
Subdivisions Cured‐In‐Place
Pipeline
and
Sewer
Replacement
in
Athena
Park
and
Olympia
Woods
Subdivisions














330,000
 












300,000
 












620,000
 












910,000
 










1,250,000
 










1,625,000
 










2,280,000


11 20 21 30 32 54 76












3,035,000


102

Orland
Park

IL

CDBG

Orland
Park

IL

CDBG

El
Cameno
Park
Phase
II



Hardscape
including
monument,
sea3ng,
pedestrian



ameni3es.
Interpre3ve
 signage,
addi3onal
recrea3on Local
Street
resurfacing

Orland
Park

IL

CDBG

151st
Street
LaGrange
Road
to
West
Avenue
watermain
reconstruc3on

Orland
Park

IL

Energy

(12)
Compact
helix
wind
turbines

Orland
Park

IL

Energy

Installa3on
of
automated
building
controls
‐
modem

automated
control
devices;
Cultural
Center

Orland
Park

IL

Energy

Solar
collec3ng
pool
cover;
Centennial
Pool

Orland
Park

IL

Energy

Orland
Park

IL

Orland
Park














200,000


8














300,000


10












4,300,000


25
















78,000


3
















35,000


3












1,500,000


3

Replace
(2)
Air
Units
at
Franklin
Loebe
Center
Gym


with
Energy
Efficient
units
















75,000


4

Energy

Replace
(3)
Air
Units
at
Civic
Center
with
Energy


Efficient
Units














125,000


4

IL

Energy

Replace
(4)
Air
Units
at
Village
Hall
with
Energy


Efficient
units














300,000


4

Orland
Park

IL

Energy

Solar
Thermal
Domes3c
Hot
Water
Hea3ng


System
‐
Village
Hall












1,500,000


4

Orland
Park

IL

Energy

Installa3on
of
automated
building
controls
‐
modem
automated
control
devices;
Old
Police
Department














800,000


5

Orland
Park

IL

Energy












2,000,000


5

Orland
Park

IL

Energy












1,500,000


5

Orland
Park

IL

Energy

Replacement
of
T12
lamps
and
magne3c
ballasts


with
high
efficiency
ligh3ng
‐
Village
Hall,
Loebe


Center,
 Civic
Center,
Old
Police
Department Village
Hall,
Civic
Center,
Loebe
Center,
Old
Police


Department
recommissioning;
pneuma3c
controls


on
 Variable
Air
Volume
(VAV)
boxes,
demand


ven3la3on
control,
etc. Green
Roof
system
installed
Village
Hall


Light
weight
substrate,
sedum












1,500,000


6

Orland
Park

IL

Public
Safety

Crime‐free
rental
housing
coordinator

Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park

IL IL IL IL IL IL IL IL

Public
Safety Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit

Community
Service
Officers


(Civilian
Police
Aides) ROW
acquisi3on Metra
Bridge
Replacement;
LaGrange
Road 143rd
Street
and
LaGrange
Road
Intersec3on


Improvement 159th
Street:
Ravinia
Avenue
to
Will
Cook
Road,
reconstruc3on
and
widening 143rd
Street
Expansion,
Phase
I:
LaGrange
Road
to
108th
Avenue;
Phase
II:
108th
Avenue
to
Will
Cook
Road Mapping,
prin3ng,
and
distribu3on
of
brochure Signage,
marke3ng,
web
hos3ng
for
communica3ons,


demonstra3ons/special
events
















35,000
 














38,000
 










1,800,000
 








20,000,000
 










9,600,000
 








12,000,000
 








18,600,000
 















5,000


1 3 0 8 10 12 24














250,000


2

Orland
Park

IL

Transit

Orland
Park Orland
Park

IL IL

Transit Transit

(12)
Transit
kiosks
located
throughout
the
Village


to
provide
travelers
with
real
3me
loca3ons
and


schedules
 for
trains,
electric
buses,
bicycles Development
of
rou3ng
system,
key
connec3ons


with
mass
transit,
tracking
hardware
and
sobware


for
 Installa3on
of
(6)
Veloway
bike
share
systems
in
key


loca3ons
throughout
the
Village














150,000
 










1,500,000


3 3














150,000


5

Orland
Park

IL

Transit

Purchase
of
(6)
electric‐powered
passenger
vans

Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park

IL IL IL IL IL IL

Water Water Water Water Water Water

Distribu3on
System
Analysis


Hydraulic
study
and
future
demand
modeling Large
Meter
Tes3ng Water
Valve
Exercising Distribu3on
System
Improvements Lib
Sta3on
Improvements Sanitary
Sewer
Lining/Televising
and


Improvements














360,000
 












150,000
 














15,000
 












160,000
 












200,000
 












100,000
 












200,000


7 2 3 3 4 4 5

City

State

Program

Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Orland
Park Ofawa Ofawa Ofawa

IL IL IL IL IL IL IL IL IL IL IL

Water Water Water Water Water Water Water Water CDBG Energy Energy

Ofawa

IL

Public
Safety

Wells,
Pump
Sta3on,
and
Storage
Improvements Crescent
Park
underdrain Water
Main
Replacement
‐
Ravinia
Ave
and



143rd
St Fernway
Drainage
Ditch
and
Tinley
Creek


Restora3on Regional
deten3on
pond Subdivision
Water
Main
Replacement Water
Main
Reloca3on
and/or
Replacements


143rd
St
‐
Route
45
to
Will
Cook
Rd Flood
Study
Stormwater
Management


Improvements Historic
restora3on
‐
exterior
and
interior
improvements
of
Reddick
Mansion
for
energy
efficiency
and
 Boiler
‐
Replace
aged
inefficient
boiler
at
McKinley
School
for
energy
effiency Mechanical
‐
Update
mechanical
systems
and
controls
for
energy
efficiency
and
occupant
comfort
at
all
OES
 schools 911
system
‐
Hire
2
emergency
dispatchers
to
befer
staff
24
hr
emergency
dispatch
center

Project
Descrip3on

Ofawa

IL

Public
Safety

Ofawa

IL

Ofawa

Funding
Required 












200,000
 














20,000
 












850,000
 












300,000
 












750,000
 










1,750,000
 










1,500,000
 










1,373,000
 










1,700,000
 












125,000


Jobs

5 7 8 12 12 12 25 30 42 5












4,260,000


38














100,000


2

COPS
hiring
program
‐
2
new
Police
officers
for
patrol
and
befer
deter
crime














150,000


2

Public
Safety

Police
cars
‐
D.A.R.E
vehicle
and
2
marked
squad
cars
















80,000


3

IL

Public
Safety

Unmarked
cars
‐
4
unmarked
police
cars
for
dec3ve's
division
















80,000


4

Ofawa

IL

Public
Safety
















60,000


14

Ofawa

IL

Public
Safety

Equipment/Technology
‐
purchase
6
s3nger
stytems,
5
tac3cal
entry
rifles
and
undercover
surveillance
 video/audio
equipment
for
patrols
and
narco3cs
division
and
replace
re3ring
K‐9
unit
including
cost
of
dog Replace
20‐year
old
failing
fire
engine
with
new
1500
gpm
pumper
fire
engine
‐
(9
firefighters
and
5
mfg
jobs)














400,000


14

Ofawa

IL

Public
Safety














500,000


24

Ofawa

IL

Schools

South
Fire
Sta3on
rennova3on
‐
repair,
enlarge
and
bring
fire
sta3on
up
to
current
codes
and
standards
‐
bid
in
 January
(9
firefighters
and
15
const
jobs) ADA
Accessability
‐
Replace
failing
wheelchair
libs
at
Lincoln
and
Jefferson
Schools














130,000


4

Ofawa

IL

Schools














140,000


4

Ofawa

IL

Schools

Security
‐
Provide
phones
in
occupied
spaces/classrooms
at
all
OES
schools
to
enhance
intruder/disaster
 response Expand
‐
Construct
OES
district
storage
to
free
up
space
and
alleviate
school
building
overcrowding














800,000


15

Ofawa

IL

Schools














762,000


16

Ofawa

IL

Schools

Security
‐
Provide
visitor
management,
access
control,
and
building
security
hardware
including
an3‐intruder
 door
hardware Rennovate
‐
Replace
worn
and
aged
roofs
and
tuck
point
deteriorated
masonry
at
Lincoln
and
Jefferson
Schools














719,000


20

Ofawa

IL

Schools

Rennovate
‐
refinish
worn
wood
flooring
at
Lincoln
School,
paint
interiors,
and
repair
parking
at
OES
all
schools












1,425,000


26

Ofawa

IL

Schools

Classrooms
‐
Construct
classroom
addi3on
at
Jefferson
School
to
alleviate
overcrowding












2,800,000


36

Ofawa

IL

Schools

Ofawa Ofawa

IL IL

Streets/Roads Streets/Roads

Flooded
school
replacement
‐
replace
uninhabitable
OES
Central
School
flooded
on
9/08
with
new
school
out
 of
flood
plain.

Provide
classrooms
for
5th
and
6th
grades
who
have
none. Enhancement
‐
Fox
River
pedestrian
bridge
‐
provide
walking
bridge
to
connect
high
school
to
YMCA
and
 FAU
Route
rennova3on
‐
Improve
substandard
FAU
routes











24,712,000
 










1,700,000


140 16












2,500,000


18

Ofawa

IL

Streets/Roads












1,200,000


20

Ofawa

IL

Streets/Roads














400,000


450

Ofawa

IL

Transit

Poplar
Street
/
Bluff
Street
hill.

Out
for
bids
on
1‐07‐08.

This
narrow
street
on
a
very
steep
hill
is
a
local
 collector
and
very
dangerous.

This
will
flafen
and
widen
the
street.

20
const
jobs Dayton
Road
widening
‐
includes
adding
a
bi‐direc3onal
leb
turn
lane
to
bring
a
Kohl's
Dis3bu3on
Center
(400
 FTE
jobs)
and
Clover
Distribu3on
Center
(50
FTE
jobs)
to
Ofawa New
bus
to
replace
failing
old
bus
on
City
elderly
free
bus
program.
















75,000


3

Ofawa

IL

Water

Well
#11
raw
water
line
‐
replace
failing
line
from
well
to
treatment
facility














125,000


8

Ofawa

IL

Water












8,000,000


30

Ofawa

IL

Water

East
Regional
Lib
Sta3on
‐
Construct
new
LS
to
provide
capacity
to
separate
combined
sewers
on
east
side
of
 city
and
open
up
capacity
for
City‐owned
Industrial
Park Wastewater
Treatment
Plant
‐
ready
to
bid
in
January.

Desparately
needed
repairs
/
updates
30
const
jobs












8,000,000


30

Ofawa

IL

Water














750,000


60

Ofawa

IL

Water












1,500,000


163

Pala3ne

IL

CDBG

Chapel
St.
Water
main
‐
ready
to
bid
in
January
‐
Water
main
to
replace
old
4"
failing
with
a
12"
pipe
to
provide
 fire
flow
to
exis3ng
homes
and
proposed
Heritage
Harbor
of
Ofawa
(50
FTE
and
10
const
jobs) West
Water
Tower
‐
Project
is
bid
and
awai3ng
funding.

This
500,000
gal.
tower
is
necessary
to
retain
153
 manufacturing
jobs
and
keep
Pilkington
Glass
in
Ofawa.

Also
sa3sfies
the
EPA
mandate
for
more
overhead
 storage.

(153
FTE
MFG
+
10
const
jobs
) Street
Resurfacing










15,000,000


20

Pala3ne

IL

Public
Safety

Reloca3on
of
Pala3ne's
northwest
fire
sta3on

Pala3ne Pala3ne Pala3ne Pala3ne Pala3ne Pala3ne Pala3ne Pala3ne Palos
Park Palos
Park Palos
Park Palos
Park Palos
Park Palos
Park Palos
Park Palos
Park Palos
Park Park
Forest Park
Forest Park
Forest Park
Forest Park
Forest Paw
Paw

IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL IL

Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water CDBG

Curb
&
gufer
extension
program Road
resurfacing Dundee
Road
signal/pedestrian
crossings
at
Park
Place
entrance Water
tank
maintenance Drainage
ditch
reconstruc3on
and/or
elimina3on Sanitary
sewer
sliplining Storm
sewer
&
drain
3le
replacement/expansion Water
main
replacement Culvert
Replacement
Projects
for
Flood
Relief Ditch
Regrading
Projects
for
Flood
Relief Sidewalk
Repair
Program Street
Resurfacing
Program Emergency
Generator
purchase
for
lib
sta3ons Fire
Hydrant
Replacement
Program Water
System
Valve
Replacement
Program Sanitary
Sewer
Cured
in
Place
pipelining Pump
Sta3on
Rehabilita3on‐‐Water
Storage
Upgrade Street
Ligh3ng
Replacement. Park
Forest
Police
Department
Center/Sta3on
Construc3on. Excess
Flow
Treatment
Facility Marshall
Fields
Demoli3on.
Building
tear
down
to
make
space
for
redeveloping
the
business
district. Water
Main
improvements. Completer
rehabilita3on
of
Peru
Street
with
pavement,
water
main,
storm
sewer,
curb,
sidewalk,
and
gufer.












3,000,000
 












350,000
 










1,650,000
 










2,250,000
 












650,000
 












200,000
 












150,000
 












200,000
 












440,000
 














90,000
 












105,000
 












240,000
 












420,000
 












150,000
 












144,000
 












188,000
 












250,000
 










1,800,000
 












350,000
 












800,000
 












657,000
 












950,000
 










1,000,000


10 8 8 10 5 6 6 6 8 3 4 8 14 5 5 6 8 60 5 12 15 15 20














545,000


15

City

State

Program

Peotone

IL

Energy

Replace
30‐year
old
HVAC
system
in
police
sta3on
with
energy
efficient
system

Project
Descrip3on

Peotone

IL

Streets/Roads

Wilmington/Peotone
Road
sidewalk

Peotone Peotone Peotone Peotone Peotone Peotone Peru Peru Peru

IL IL IL IL IL IL IL IL IL

Streets/Roads Water Water Water Water Water CDBG CDBG CDBG

Street
resurfacing Generator
installa3on
at
wastewater
treatment
plant Removal
of
abandoned
treatment
plant Villagewide
sanitary
sewer
lining Watermain
replacement Construc3on
of
water
tower Proposed
headend
provides
the
department
with
necessary
communica3ons
links
to
satellite
signals
and
relays
 Reliever
system
for
Marquefe
St.
sanitary
trunk
sewer
system
will
take
the
excess
flow
and
divert
it
around
the
 Divide
the
large
combined
sewer
area
into
two
smaller
sub
areas
to
afford
relief.

Peru

IL

CDBG

Peru

IL

CDBG

Construct
a
high
voltage
interconnects
between
Peru
and
Princeton
to
provide
a
more
reliable
electric
power
 network
between
the
two
communi3es. Addi3on
of
a
second
powerhouse
on
the
north
side
of
the
exis3ng
Starved
Rock
Lock
&
Dam.


Peru

IL

Energy

Peru

IL

Energy

Peru

IL

Streets/Roads

Peru

IL

Water

Wind
turbine
ganera3on.

Replace
2.5
MW
of
electric
genera3ng
capacity
of
its
oil
and
coal
genera3ng
with
a
 wind
turbine. Peru
natural
gas
turbine
genera3on.

Replace
50
MW
of
primary
peak
electric
genera3ng
capability
of
its
 exis3ng
genera3on
with
a
natural
gas
turbine. Construc3on
of
new
roadway
to
extend
Wenzel
Road
in
to
Peru's
northern
Commercial
and
Industrial
area.

 Will
provide
route
to
relieve
traffic
in
residen3al
area. Construct
drying
beds
at
sanitary
sewer
plant.

Peru

IL

Water

Extend
municipal
water
and
sewer
to
open
up
new
development
area
along
Plank
Rd.
and
north
of
Plank
Rd.

Princeton

IL

CDBG

Sewer
and
Water
installa3on
to
Grove
trailer
park

Princeton

IL

CDBG

Princeton

IL

Princeton

Funding
Required 















6,000


Jobs 1














200,000
 












500,000
 












150,000
 












100,000
 












300,000
 












850,000
 










2,500,000
 












750,000
 












825,000


7 17 5 5 10 29 42 21 23












7,150,000


200










15,550,000


434










20,000,000


560












4,000,000


114










38,000,000


1064










10,323,000


289














560,000


16












1,540,000


43














500,000


14

Installa3on
of
sewer
line
to
Greencrob.














600,000


17

CDBG

Repaving
of
city
streets














800,000


22

IL

CDBG

Princeton

IL

CDBG

Construc3on
of
roadway
extension,
road
overlay,
water
and
sanitary
sewer
extension
to
prepare
city‐
owned
 large
parcel
for
development. Sanitary
sewer
deten3on
for
flooding
overflow
to
prevent
basement
backup
flooding.

Princeton

IL

Energy

Replace
streetlights
with
incandescent
light
bulbs

Princeton Quincy Quincy Quincy

IL IL IL IL

Energy Public
Safety Streets/Roads Water

Richton
Park

IL

Energy

Install
real
3me
water
and
electric
meters
 Public
Infrastructure
to
Support
Economic
Development
Projects Transporta3on
Projects Environmental
Projects Construct
new
lime
sobening
treatment
structure
$1,000,000 Replace
chemical
feeding
equipment
and
dust
collec3on
system
$450,000 High
service
(potable
water)
pump
replacement Energy
Efficiency
at
Village
Hall

Richton
Park

IL

Streets/Roads

Richton
Park

IL

Richton
Park














875,000


25












2,900,000


81














400,000
 












800,000
 










6,918,000
 








10,850,000


11 22 250 250












7,069,924


150














792,000


13

Poplar
Avenue
Extension












1,770,000


25

Streets/Roads

Town
Center
Roadway
Improvements












1,500,000


25

IL

Streets/Roads

Green
Community
Center












2,500,000


50

Richton
Park

IL

Streets/Roads

Expansion
of
Village
Hall










23,000,000


55

Richton
Park

IL

Transit

Town
Center
Metra
Garage
Construc3on










13,500,000


43

Richton
Park

IL

Water

Town
Center
Stormwater
Improvements














975,000


30

Richton
Park

IL

Water

Storm
Sewer
and
Drainage
Improvements












1,210,000


57

Richton
Park

IL

Water

Water
and
Sewer
Improvements












2,800,000


60

Riverdale

IL

CDBG

Job
Training
Program
through
Demoli3on
Projects














300,000


16

Riverdale

IL

CDBG












2,250,000


56

Riverdale

IL

CDBG

Abatement/Environmental
Remedia3on
of
buildings
to
be
demolished
as
a
part
of
the
Pacesefer
 Redevelopment Grainery
Demoli3on












4,000,000


100

Riverdale

IL

CDBG

Environmental
remedia3on
of
industrial
sites










10,000,000


250

Riverdale

IL

CDBG

Pacesefer
Redevelopment
Phases
2,
3,
&
4










26,000,000


500

Riverdale

IL

Energy












1,250,000


31

Riverdale

IL

Public
Safety

Winteriza3on
and
Energy
Efficient
Retrofits
of:
Village
Hall,
Resource
Center,
Public
Safety
Building,
and
Public
 Works
Garage Surveillance
Camera
System
Installa3on
at
various
loca3ons














500,000


13

Riverdale

IL

Public
Safety

Hiring
of
15
addi3onal
Police
Officers












1,350,000


15

Riverdale

IL

Streets/Roads

137th
Street
&
144th
Street
Viaduct
Center
Pier
Impact
Afenuator
Replacement
















80,000


2

Riverdale

IL

Streets/Roads

138th
Street,
Halsted
Street
to
Indiana
Avenue,
Ligh3ng
System
Upgrades














500,000


13

Riverdale

IL

Streets/Roads

144th
Street
Business
District
Ornamental
Ligh3ng














700,000


18

Riverdale

IL

Streets/Roads

Emergency
Tree
Removal/Trimming












1,000,000


25

Riverdale

IL

Streets/Roads

Sidewalk
Repair/Replacement
Program












1,000,000


25

Riverdale

IL

Streets/Roads

Street
and
Alley
Resurfacing
Program










13,000,000


325

Riverdale

IL

Transit

Riverdale
METRA
Train
Sta3on
Improvements














250,000


6

Riverdale

IL

Transit

Ivanhoe
METRA
Train
Sta3on
Improvements














450,000


11

Riverdale

IL

Water

146th
Street
Lib
Sta3on
Upgrades














300,000


8

Riverdale

IL

Water

Riverdale
Marina
Water
main/Storm
Sewer
Extension














300,000


8

Riverdale

IL

Water

Sanitary
Sewer
Lining
Program














500,000


13

Riverdale

IL

Water

Emergency
Water
Main
Repairs/Replacement












1,000,000


25

Riverdale

IL

Water

Water
Distribu3on
System
Rehabilita3on/Repairs












4,050,000


101

Riverdale

IL

Water

Northeast
Riverdale
Storm
Sewer
Separa3on
Project












7,000,000


175

Romeoville

IL

Streets/Roads

Downtown
Sidewalk
Replacement














400,000


28

Romeoville

IL

Streets/Roads

Village
Hall
Traffic
Signal














250,000


33

Romeoville

IL

Streets/Roads

135th
Street
Right
Turn
Lane














350,000


40

City

State

Program

Romeoville

IL

Streets/Roads

135th
Street
Resurfacing

Project
Descrip3on

Funding
Required 










1,800,000


Jobs 65

Romeoville

IL

Streets/Roads

Village‐wide
Resurfacing












1,500,000


80

Romeoville

IL

Streets/Roads

Street
Light
Replacement












2,500,000


85

Romeoville

IL

Streets/Roads

Normantown
Road
Expansion












2,400,000


115

Romeoville

IL

Transit

PW
Site
Work
Phase
2














750,000


60

Romeoville

IL

Water

Highpoint
Lib
Sta3on
Removal














300,000


15

Romeoville

IL

Water

Wilco
Lib
Sta3on
Removal














400,000


15

Romeoville

IL

Water

Lake
Strini
Wellhouse
Rehab














500,000


25

Romeoville

IL

Water

Lewis
University
Lib
Sta3on














500,000


25

Romeoville

IL

Water

Woods
Lib
Sta3on
Replacement














750,000


25

Romeoville

IL

Water

Historic
District
Sewer
Lining












1,500,000


30

Romeoville

IL

Water

Lewis
University
Watermain
Loop












1,600,000


80

Romeoville

IL

Water

Phase
2
WWTP
Upgrades












6,500,000


240

Sandwich

IL

Public
Safety

Records
and
telecommunica3ons
replacement
‐
systems
currently
in
use
date
back
to
the
late
1980s

Sandwich

IL

Streets/Roads

Fairwind
Boulveard
‐
Center
Street
to
Lisbon
Street

Sandwich

IL

Streets/Roads

Sandwich

IL

Sandwich
















50,000


0












1,200,000


0

Lions
Road
Reconstruc3on
‐
improve
traffic
flow
adjacent
to
a
school
campus














439,000


0

Streets/Roads

Main
Street
Reconstruc3on
‐
improve
traffic
safety
and
flow
adjacent
to
a
hospital














372,000


0

IL

Water

Clark
Street
Water
Plant
Improvements
‐
replace
750
gpm
well,
increase
treatment
capacity














905,000


0

Sandwich

IL

Water

Northwest
Water
System
‐
two
500
gpm
wells,
1MMG
water
tower,
treatment
building,
site
improvements

Sauk
Village

IL

CDBG

Sauk
Village

IL

Sauk
Village

IL

Sauk
Village












3,770,000


0

Village‐wide
Valve
and
Fire
Hydrant
Removal
and
Replacement














500,000


23

CDBG

Culvert
Repair














100,000


25

CDBG

Village‐wide
Curb
Removal
and
Replacement














250,000


26

IL

CDBG

Village‐wide
Handicap
Ramp
and
Sidewalk
Replacement














300,000


28

Sauk
Village

IL

CDBG

Village‐wide
Street
Resurfacing












2,200,000


45

Schaumburg

IL

Airport

Airport
Runway
Rehabillita3on
‐
Phase
2












1,800,000


40

Schaumburg

IL

CDBG

Small
Business
Loan
Program
















50,000


Schaumburg

IL

CDBG

James
Court
Roadway
&
Sanitary
Sewer
Repair














762,880


30.5

Schaumburg

IL

Energy

Provide
grants
to
nonprofit
organiza3ons
to
perform
energy
efficiency
retrofits
















50,000


1

Schaumburg

IL

Energy

Conduc3ng
residentail
and
commercial
building
energy
audits
















25,000


2

Schaumburg

IL

Energy

CO2
Baseline
for
C‐GAP
plan
















50,000


3

Schaumburg

IL

Energy

Develop
a
public
educa3on
program
to
increase
par3cipa3on
and
efficiency
rates
for
recycling
programs
















25,000


3

Schaumburg

IL

Energy
















25,000


3

Schaumburg

IL

Energy

Establishing
financial
incen3ve
programs
for
energy
efficiency
improvements
(loan
programs,
rebate
programs,
 waive
permit
fees) Airport
Light
Retrofit

Schaumburg

IL

Energy

LED
Street
Lights
on
Plum
Grove

Schaumburg

IL

Energy

Schaumburg

IL

Energy

Schaumburg

IL

Energy

Mar3ngale
Bikepath

Schaumburg

IL

Public
Safety

Integrated
Automa3c
License
Plate
Reader














200,000


Schaumburg

IL

Water

Repair
and
Paint
Reservoir
#2














300,000


30

Schaumburg

IL

Water

Repair
and
Paint
Reservoir
#22














300,000


30

Schaumburg

IL

Water

Repair
Reservoir
#19














300,000


30

Schaumburg

IL

Water

Repair
Reservoir
#20














300,000


30

Schaumburg

IL

Water

Schaumburg
Road
Watermain
Slipline














350,000


30

Schaumburg

IL

Water

Hill
n'
Dale
Improvements














400,000


40

Schaumburg

IL

Water

Knightsbridge
Lib
Sta3on














440,000


40

Seatonville

IL

CDBG

Water
improvemrnt
















40,000


1

Seneca

IL

CDBG

Construct
80'
X
40'
addi3on
to
the
Village
Hall
to
house
Police
Department,
911
Center,
Public
Safety
func3on.














325,000


9

Seneca

IL

CDBG

Rebuild
shipyard
road
to
truck
route
standards
for
improved
access
to
industrial
park














968,000


137

Sheffield

IL

CDBG

Completely
rehabilitate
two
malfunc3oning
and
obsolete
wastewater
lib
sta3ons.














100,000


3

Sheridan

IL

CDBG

Construct
roof
over
digestor
and
drying
beds
and
rehabilitate
clarifier
#3
to
improve
treatment
quality.














250,000


7

South
Holland

IL

Energy

LED
Bulb
Replacement
at
Traffic
Signals














205,000


7

South
Holland

IL

Energy

HVAC
Units
&Controls
in
Municipal
Complex














642,000


21

South
Holland

IL

Public
Safety

CALEA
Coordinator
















60,000


1

South
Holland

IL

Public
Safety

Crime
Free
Housing/Criminal
Analyst
Coordinator
















60,000


1

South
Holland

IL

Public
Safety

Emergency
Communica3ons
System
and
Center
at
the
Police
Facility














750,000


4

South
Holland

IL

Public
Safety

Addi3onal
Police
Officers
on
the
Street/Detec3ve
Division














350,000


6

South
Holland

IL

Streets/Roads

Road
Salt
Storage
Dome














653,000


16

South
Holland

IL

Streets/Roads

Town
Center
Parking
Lot














430,000


17

South
Holland

IL

Streets/Roads

Prince
Drive
Bike
Path














685,000


27

South
Holland

IL

Streets/Roads

VanDam
Frontage
Road
Reconstruc3on














810,000


32

South
Holland

IL

Streets/Roads

Wausau
Avenue
Extension
at
US
Route
6












1,220,000


51

South
Holland

IL

Streets/Roads

Pavement
Management
Resurfacing
Program












8,360,000


278

South
Holland

IL

Water

Water
Main
Replacement
at
Cofage
Grove
Avenue
Bridge














106,340


4

South
Holland

IL

Water

Sibley
Pump
Sta3on
Rehabilita3on














133,000


5

South
Holland

IL

Water

US
Route
6
Water
Main
Reloca3on














400,000


13

South
Holland

IL

Water

Canal
Street
Water
Tower
Pain3ng,
Cleaning
and
Repair














422,000


14

South
Holland

IL

Water

Thornton
Ave
Relief
Sewer














410,000


15

South
Holland

IL

Water

Veterans
Park
South
Stormwater
Reten3on
Facility












1,835,000


46

South
Holland

IL

Water

Sanitary
Sewer
Rehabilita3on
and
Replacement










12,380,000


247
















40,000


5












1,230,000


10

Mitchell
Blvd
Bikepath














900,000


10

Public
Safety
Building
Light
Retrofit
















60,000


10












1,200,000


15

City

State

Program

South
Wilmington

IL

CDBG

Storm
sewer
improvements

Project
Descrip3on

Funding
Required 












400,000


Jobs 11

South
Wilmington

IL

CDBG

South
Wilmington

IL

CDBG

Street
improvements














400,000


11

Construc3on
of
new
water
tower
to
replace
aging
undersized
structure
and
watermain
replacement














800,000


Spring
Valley

IL

Water

Spring
Valley

IL

Water

Construct
the
Ladd
Road
sewer
replacement,
including
reconstruc3on
of
a
por3on
of
Ladd
Road
that
will
be
 impacted
by
construc3on. Separate
combined
sewer
system
in
two
problem
areas
that
create
health
and
water
problems

22












1,800,000


50












2,500,000


Standard

IL

Water

70

Construct
new
water
treatment
plant
for
purpose
of
removing
elevated
level
of
radium
from
the
water
supply.














895,999


Streator

IL

25

Energy

City
Hall
HVAC
Rehabilita3on














800,000


Streator

8

IL

Streets/Roads

2008
Roadway
Maintenance
(Overlay
and
Reconstru3on
of
various
City
streets)












2,000,000


20

Streator

IL

Streets/Roads

City
Sidewalk
Rehabilita3on
Program














350,000


20

Streator

IL

Streets/Roads

Oakley
Avenue
Patching
&
Resurface














500,000


20

Streator

IL

Streets/Roads

S.
Ofer
Creek
Road
Bridge
Replacements
(Project
will
repace
two
aging
box
culverts)














300,000


20

Streator

IL

Water














375,000


10

Streator

IL

Water














100,000


15

Streator

IL

Water

Wastewater
Treatment
Plant
Equipment
Upgrade
(This
project
will
replace
aging
and
failed
rotor,
influent
 pump,
and
valve
equipment
at
the
City's
sewer
plant) Center
Street
Storm
Sewer
Project
(This
project
will
alleviate
basement
flooding
issues
in
a
combined
sewer
 area) Coal
Run
Creek
Sewer
Upgrade
(This
project
will
alleviate
a
combined
sewer
overflow
capacity
issue)
















60,000


15

Streator

IL

Water










14,000,000


100

Thornton

IL

CDBG

Thornton

IL

CDBG

Thornton Thornton

IL IL

Public
Safety Public
Safety

Thornton

IL

Streets/Roads

Thornton

IL

Water

Thornton

IL

Water

Thornton

IL

Water

Tinley
Park

IL

Energy

Tinley
Park

IL

Public
Safety

Tinley
Park

IL

Public
Safety

Tinley
Park

IL

Public
Safety

Tinley
Park

IL

Streets/Roads

Tinley
Park

IL

Streets/Roads

Hire
one
(1)
School
Resource
Officer
(SRO)
to
act
as
liason
between
the
Village
Police
Department
and
the
 seventeen
(17)
Schools
within
the
Village
Boundaries.

This
includes
two
(2)
major
high
schools; Hire
four
(4)
full
3me
patrol
officers
in
the
Village
Police
Department.

These
officers
would
help
to
replace
 officers
lost
through
afri3on
(The
Village
is
currently
in
a
hiring
freeze
on
employees
"lost"
through
afri3on).

 In
addi3on,
the
Village Purchase
of
ten
(10)
Kustom
Signals
in
squad
digital
video
cameras.

Cameras
will
increase
safety
for
officers,
 assist
in
prosecu3on
of
criminal
cases
and
internal
affairs
inves3ga3ons. Fire
Training
Tower/Intergovernmental
Risk
Management
Associa3on
training
lot
rehabilita3on
to
 repair/rehabilitate
exis3ng
training
site
used
for
regional
training
of
emergency
personnel. 2009
Pavement
Management
program,
to
complete
work
necessary
to
stay
ahead
of
the
deteriora3on
curve.

Tinley
Park

IL

Transit

80th
Avenue
Commuter
parking
lot
traffic
signal
upgrades
‐
1500
daily
users

Tinley
Park

IL

Transit

Central
Middle
School
commuter
parking
lot

Tinley
Park

IL

Water

Tinley
Park

IL

Water

Tinley
Park

IL

Water

Tinley
Park

IL

Tinley
Park

Kent
Street
Interceptor
Sewer
(This
project
will
replace
an
80
year
old
brick
sanitary
sewer
that
has
failed
over
 15
3mes
in
the
last
20
years.

In
addi3on
the
project
will
abandon
11
combined
sewer
overflows) Infrastructure
Improvement‐
Bury
Overhead
U3li3es. Streetscape
and
Infrastructure
Imporvements
‐
Includes
u3lity
improvements,streetscape,
signage,
sidewalks,
 plan3ng,
etc. Police
Dept.
take
home
car
program.
‐
Each
officer
is
assigned
their
own
squad
enabling
major
cost
saving
 Purchase
(1)
100
b
Arial
Plazorm
for
the
purpose
of
fire
ex3nguishment
and
rescue.
This
vehicle
would
be
 u3lized
as
a
technical
rescue
vehicle
for
the
Thornton
Quarry
which
is
the
largest
opera3onal
limestone
quarry
 in
the
United
States.
 Street
Resurfacing Village
Wide
Street
Resurfacing
Project.












5,400,000
 










6,500,000
 












275,000















975,000















800,000


12"
Arterial
Water
Main
and
Appurtenances
(7,100').
 Replacement
of
aging
undersized
arterial
water
main.
 Sewer
Rehabilita3on
‐
Downtown
Area.












3,500,000


Water
Pumping
Sta3on
Improvements. Includes
Pumps,SCADA,Emergency
Generator,
Chlorine
System,
Etc. LED
Traffic
Signals
‐
energy
reduc3on
program












1,800,000















100,000















175,000


5














132,821


1














531,284


4
















48,000


5














550,000


15












3,000,000


60














225,000


8












1,400,000


20

171st
Street
water
main
replacement
‐
for
reconstruc3on
of
grade
school














450,000


10

183rd
Street
Pump
Sta3on
Rehab.














160,000


16

Repair
of
dilapidated
sanitar
sewers
with
insitu‐repairs












1,050,000


25

Water

Kimberly
Heights
water
mains
‐
to
add
area
into
a
public
system
and
eliminate
wells












1,550,000


30

IL

Water

COnversion
to
Naturalized
Stormwater
Basins












1,000,000


100

Tiskilwa

IL

Water














350,000


10

Tiskilwa

IL

Water

Exis3ng
tower
is
a
40,000
gallon
concrete
vault
at
the
top
of
a
bluff
at
the
west
side
of
town.

This
project
 would
involve
construc3on
of
a
new
tank
at
this
loca3on Construct
new
water
treatment
plant
for
iron
and
arsenic
removal
to
replace
deteriora3ng
facility.














450,000


13

Tiskilwa

IL

Water














450,000


13

Toluca

IL

Streets/Roads

Construc3on
includes
the
replacement
of
exis3ng
broken
and
leaking
hydrants
and
valves,
installing
new
valves
 at
strategic
loca3ons
to
provide
more
efficient
opera3on
of
the
distribu3on
system
and
to
construct
new
water
 mains
to
loop
the
exis3ng
main Reconstruct
approximately
1200l.f.
of
roadway
leading
to
Windsor/Bernardi
Food
Manufacturing
Plant.














425,000


12

Tonica

IL

CDBG

Construct
new
public
works
garage,
office,
and
shop
facility
to
replace
leased
one. 












280,000


8

Tonica

IL

CDBG

Tonica

IL

Water

Street
replacements
on
Main
and
Wauponis.
Construct
new
profile
to
replace
old
railroad
crossing,
construct
 new
street
base
and
surface,
construct
new
curb
and
gufer. Construct
new
wastewater
treatment
facili3es
to
upgrade
and
replace
deteriora3ng
facili3es.

Troy
Grove

IL

CDBG

Varna

IL

Water

Verona

IL

CDBG

Construc3on
of
new
wastewater
treatment
and
collec3on
system
for
community
that
has
no
central
sanitary
 system. Replacement
of
undersized
and
deteriora3ng
water
mains
in
the
community.

Several
water
breaks
have
 occurred
leaving
residents
without
water. Street
improvements

Watseka

IL

Water

Elimina3on
of
combined
sewer
overflow

Watseka

IL

Water

Watseka

IL

Water

Watseka

IL

Water














460,000


13












1,500,000


42












2,300,000


64














500,000


14














300,000


8














300,000


12

Sewer
televising
and
grou3ng














500,000


17

Villagewide
road
resurfacing












1,000,000


33

Upgrade
wastewater
treatment
plant
facili3es
for
excess
flow












1,800,000


60

City

State

Program

Wenona

IL

Water

West
Brooklyn

IL

CDBG

West
Brooklyn

IL

CDBG

West
Brooklyn

IL

CDBG

Woodridge

IL

CDBG

Replace
deteriorated
sewer
trunk
line,
replace
combined
sewer
overflow,
replace
very
an3quated
lib
sta3on,
 rehabilitate
treatment
plant
to
eliminate
discharge
viola3ons. Replace
exis3ng
cast
iron
main
with
a
new
6"
water
main
to
prevent
leaks
and
breaks
causing
boil
orders
from
 occuring
again
in
the
future. Construc3on
of
a
new
sidewalk,
the
Downtown
sidewalk/Johnson
Street,
to
replace
the
deteriorated
sidewalk,
 to
provide
an
ADA
compliant
entrance
to
all
of
the
exis3ng
businesses,
and
to
add
decora3ve
ligh3ng
and
 handrails
to
beau3fy
the
downtown
area. Construc3on
of
an
elevated
storage
tank
that
would
provide
more
adequate
fire
flow
and
pressure
while
also
 providing
new
chemical
feed
and
control
systems
to
enhance
and
repair
the
current
issues. 63rd
Street
Stormwater
Inlet
Improvement

Project
Descrip3on

Woodridge

IL

CDBG

Woodridge

IL

Woodridge

Funding
Required

Jobs












1,800,000


50














172,500


5














345,000


10














460,000


13
















50,000


4

Heritage
Parkway
Bikepath
Extension
















72,000


4

CDBG

Building
Demoli3on/Future
Senior
Housing
Facility
Site














200,000


5

IL

CDBG

Construc3on
of
a
Municipal
Road
Salt
Storage
Dome














300,000


5

Woodridge

IL

CDBG

Stormwater
Lining
Project:
48"
Corrugated
Metal
Pipe
Lining














225,000


5

Woodridge

IL

CDBG

Construc3on
of
Outdoor
Material
Storage
Facility














300,000


6

Woodridge

IL

CDBG

Crabtree
Stream
Bank
Erosion
Mi3ga3on
and
Outlet
Pipe
Restora3on
Project














200,000


7

Woodridge

IL

CDBG

Police
Department
Facility
Expansion












9,000,000


90

Woodridge

IL

Streets/Roads

Bridge
over
Illinois
Route
53
and
Mulligan
Drive
for
Pedestrian
and
Bicycle
Traffic













2,300,000


30

Woodridge

IL

Streets/Roads

Roadway
Resurfacing
and
Rehabilita3on
Project
throughout
the
Village












2,411,200


32

Woodridge

IL

Water

Sanitary
Lib
Sta3on
By‐pass
Improvements
and
Pump
Rebuild
Project
















20,000


2

Woodridge

IL

Water

Water
System
Hydrant
and
Valve
Replacement
Project














100,000


2

Woodridge

IL

Water

Remove,
Rebuild
and
Restore
Well
#4
of
the
Woodridge
Well
Water
Source
Back‐up
Water
System
















56,000


3

Woodridge

IL

Water

Purchase
and
Installa3on
of
Water/Sanitary
Back‐up
Power
Generator















150,000


4

Woodridge

IL

Water

Sanitary
System
Reconstruc3on,
Lining,
Point
Repairs
in
Woodridge
Basin
B,
C,
and
D














676,000


7

Woodridge

IL

Water

Woodridge
Water
System
Improvement:
Brenwood
Watermain
Extension














650,000


7

Woodridge

IL

Water

Woodridge
Water
System
Improvement:
Phase
II
Extension
of
Pleasantdale
Watermain















875,000


9

Woodridge

IL

Water

Watermain
Infrastructure
Replacement
Program












1,200,000


12

Worth

IL

Energy

Installa3on
of
new
generator
for
emergency
use
at
Police
Sta3on,
Fire
House,
and
Village
Hall
















40,000


2

Worth

IL

Streets/Roads

Villagewide
pavement
resurfacing














200,000


7

Worth

IL

Streets/Roads

One
mile
of
107th
Street
PCC
patching
and
microsurfacing














400,000


14

Worth

IL

Water

Recrea3onal
area
stormwater
deten3on
basin














250,000


9

Worth

IL

Water

Villagewide
sanitary
sewer
lining














500,000


17

Wyanet

IL

CDBG














420,000


12

Wyanet

IL

Water

Replace
exis3ng
broken
and
leaking
hydrants
and
valves,
installing
new
valves
at
strategic
loca3ons
to
provide
 more
efficient
opera3on
of
the
distribu3on
system
and
to
replace
small
diameter
and
failing
water
mains. Replace
or
reline
broken
and
leaking
sanitary
sewer
mains,
and
replace
leaking
and
deteriorated
manholes.














450,000


13

Wyanet

IL

Water

Carmel

IN

CDBG

Replacement/construc3on
of
new
water
mains
in
major
part
of
community
to
replace
undersized
and
 deteriorated
water
main. Inter
Urban
Trail
‐
Construc3on
of
trail
and
reconstruc3on
of
exis3ng
rail
bridge.

Carmel

IN

CDBG

Central
Park
Phase
II
‐
Includes
construc3on
of
shelters,
restroom
building,
and
playground
including
spray
park

Carmel

IN

CDBG

Central
Park
Aqua3c
Center
Phase
II
‐
Constru3on
of
addi3onal
water
slide
and
wave
pool.

Carmel

IN

CDBG

Central
Park
Mee3ng
House
‐
Reconstruc3on
of
exis3ng
mee3ng
house
and
construc3on
of
new
parking
area.

Carmel

IN

CDBG

Carmel

IN

CDBG

Carmel

IN

CDBG

Carmel

IN

CDBG

Carmel

IN

CDBG

Founders
Park
Phase
II
Construc3on
‐
including
playground
equipment,
shelter
house,
restrooms,
and
 community
building. Hazel
Dell
Park
Phase
III
‐
Includes
construc3on
of
shelters,
trails,
and
bridge
connec3on
to
adjacent
park
on
 opposite
side
of
White
River Park
Maintenance
Building
Construc3on
‐
New
Maintenance
Building
to
allow
Carmel
Parks
to
consolidate
all
 maintenance
opera3ons
in
one
loca3on Central
Park
116th
Street
Entrance
‐
Construc3on
of
entrance
and
interior
park
roadway
to
befer
access
 exis3ng
facili3es City
Center
Parking
Structure
Phase
I

Carmel

IN

CDBG

City
Center
Parking
Structure
Phase
II

Carmel

IN

Public
Safety

Mobile
Video
System

Carmel

IN

Public
Safety

Carmel

IN

Carmel

IN

Carmel Carmel














965,000


27












1,000,000


30












1,500,000


45












2,500,000


75












2,300,000


75












3,000,000


90












3,500,000


105












3,500,000


105












4,500,000


135












8,000,000


240










12,000,000


360














400,000


3

Citywide
Video
System












2,000,000


25

Public
Safety

Fire
Engine
Purchase
‐
2
New
Fire
Engines












2,000,000


60

Public
Safety

Carmel
Fire
Sta3on
No.
43
Construc3on












4,000,000


120

IN

Public
Safety

Carmel
Fire
Sta3on
No.
44
Construc3on












4,000,000


120

IN

Public
Safety

Carmel
Police
Sta3on
and
City
Court
Building
Construc3on












6,000,000


150

Carmel

IN

Public
Safety










12,000,000


360

Carmel

IN

Streets/Roads

Carmel

IN

Streets/Roads

Communica3on
Center
Construc3on
‐
Emergency
Opera3ons
Center
which
houses
the
Emergency
 Management
and
Public
Safety
Communica3ons
Command
&
Controls Southwest
Clay
Township
Miscellaneous
Drainage
Improvements
in
Sa3sfac3on
of
Annexa3on
Agreement
 (Carmel/Hamilton
County
Joint
Project) 106th
Street
&
Shelborne
roundabout

Carmel

IN

Streets/Roads

Carmel

IN

Carmel














900,000


27












1,000,000


30

141st
Street
&
Shelborne
roundabout












1,000,000


30

Streets/Roads

Towne
Road
Mul3‐Use
Path
Project
‐
Phase
I
‐
106th
to
116th
and
116th
Street
Path
Connec3ons
to
Parks












1,200,000


36

IN

Streets/Roads

111th
St.
&
College
Ave.
Roundabout












1,300,000


39

Carmel

IN

Streets/Roads

106th
Street
&
Hazel
Dell
Pkwy
Roundabout`












1,500,000


45

Carmel

IN

Streets/Roads

106th
Street
&
Towne
Rd.
Roundabout












1,500,000


45

Carmel

IN

Streets/Roads

111th
Street
&
Pennsylvania
Street
roundabout












1,500,000


45

Carmel

IN

Streets/Roads

Hazel
Dell
Pkwy
&
116th
Street
Roundabout
Construc3on












1,750,000


53

Carmel

IN

Streets/Roads

Old
Meridian
Street
&
Carmel
Drive
Roundabout
Construc3on












1,750,000


53

Carmel

IN

Streets/Roads

Towne
Road
&
116th
Street
Roundabout
Construc3on












1,750,000


53

Carmel

IN

Streets/Roads

126th
Street
&
Gray
Rd.
Roundabout
Construc3on












1,800,000


54

City

State

Program

Carmel

IN

Streets/Roads

131st
Street
&
Gray
Rd.
Roundabout
Construc3on

Project
Descrip3on

Funding
Required 










1,800,000


Jobs 54

Carmel

IN

Streets/Roads

136th
Street
&
Gray
Rd.
Roundabout
Construc3on












1,800,000


54

Carmel

IN

Streets/Roads

106th
and
Ditch
Road
Roundabout
(Carmel/Hamilton
County
Joint
Project












2,000,000


60

Carmel

IN

Streets/Roads

106th
Street
Mul3‐Use
Path
Project
‐
Phase
I
(Carmel
Engineering/Carmel
Water
Joint
Project)












2,000,000


60

Carmel

IN

Streets/Roads

3rd
Ave.
SW
Reconstruc3on
from
Gradel
Drive
to
City
Center
Drive












2,500,000


75

Carmel

IN

Streets/Roads

Hazel
Dell
Road
miscellaneous
improvements
between
116th
Street
and
146th
Street












2,600,000


78

Carmel

IN

Streets/Roads

131st
Street
parallel
mul3‐use
path
from
Hazel
Dell
Parkway
to
Keystone
Ave.












3,000,000


90

Carmel

IN

Streets/Roads

131st
Street
Reconstruc3on
from
US‐31
to
Springmill
Rd.












3,500,000


105

Carmel

IN

Streets/Roads












3,500,000


105

Carmel

IN

Streets/Roads

Guilford
Road
‐
City
Center
Drive
to
131st
Street
improvement:
indluding
roundabout
at
131st
St.,
turning
lane,
 storm
sewers,
curbs Guilford
Road
reconstruc3on
from
116th
St.
to
City
Center
Drive












3,500,000


105

Carmel

IN

Streets/Roads

126th
Street
from
Shelborne
Road
to
Towne
Road












4,000,000


108

Carmel

IN

Streets/Roads

Gray
Road
&
116th
Street
Roundabout
Construc3on












3,600,000


108

Carmel

IN

Streets/Roads

Carmel
Drive
and
City
Center
Drive
Roundabout
Construc3on












4,000,000


120

Carmel

IN

Streets/Roads

96th
and
Towne
Road
Roundabout
(Carmel/Hamilton
County
Joint
Project












4,500,000


135

Carmel

IN

Streets/Roads

Veterans
Way
Extension
from
City
Center
Drive
to
Main
Street












4,500,000


135

Carmel

IN

Streets/Roads

96th
St.
Improvements
–
Shelborne
Rd.
to
Towne
Rd.
(Carmel/Hamilton
Co.
Joint
Project)












5,000,000


150

Carmel

IN

Streets/Roads












5,000,000


150

Carmel

IN

Streets/Roads












5,000,000


150

Carmel

IN

Streets/Roads

96th
Street
&
Commerce
Dr.
Project
(Carmel/Hamilton
Co.
Joint
Project)
‐
Improvements
on
96th
between
 Michigan
Rd.
&
Shelborne Towne
Road
Reconstruc3on
‐
131st
Street
to
146th
Street
crea3ng
a
4‐lane
blvd
with
mul3‐use
paths,
curbs,
 and
storm
sewers Rangeline
Road
Reconstruc3on
from
136th
Street
to
US‐31












6,000,000


180

Carmel

IN

Streets/Roads

Shelborne
Road
from
north
of
116th
Street
to
131st
Street












6,500,000


195

Carmel

IN

Streets/Roads

131st
Street
Reconstruc3on
From
4th
Ave.
SW
to
US‐31












7,000,000


210

Carmel

IN

Streets/Roads

Illinois
Street
Construc3on
Phase
III‐
103rd
to
116th
‐
Construc3on
of
a
new
4‐lane
boulvard












8,000,000


240

Carmel

IN

Streets/Roads

3rd
Avenue
SW
Reconstruc3on
and
Esplanade
from
City
Center
Drive
to
2nd
Street
SW












8,500,000


255

Carmel

IN

Streets/Roads

Veteran's
Way
Construc3on
from
City
Center
Drive
to
Execu3ve
Drive












8,500,000


255

Carmel

IN

Streets/Roads

Keystone
Avenue

and
136th
Street










19,400,000


582

Carmel

IN

Streets/Roads

River
Road
Reconstruc3on
from
116th
Street
to
146th
Street










22,000,000


660

Carmel

IN

Streets/Roads

Keystone
and
131st
Street
Interchange
construc3on










24,600,000


738

Carmel

IN

Streets/Roads










38,000,000


1140

Carmel

IN

Streets/Roads










50,000,000


1500

Carmel

IN

Transit

Keystone
Avenue
at
116th
Street
and
Carmel
Drive
interchanges‐
 These
intersec3ons
will
be
converted
to
an
interchange
and
the
traffic
signal
will
be
eliminated.

Construc3on
is
 scheduled
to
begin
in
early
2009.

116th
Street
and
Carmel
Drive
closures
 96th
Street
&
Keystone
Ave.
Interchange
Construc3on
‐
The
current
signalized
intersec3on
will
be
converted
to
 an
interchange Public
Transporta3on
Garage
Construc3on
and
Purchase
of
New
Vehicles












5,000,000


150

Carmel

IN

Water

Wind
Turbine
Project












4,000,000


25

Carmel

IN

Water

Waste
Water
Treatment
Plant
Upgrade










20,000,000


300

Carmel

IN

Water










50,000,000


1500

Crawfordsville

IN

Streets/Roads

New
36"
Water
Transmission
Line
Installa3on
and
Construc3on
of
New
Water
Plant
to
Serve
expanding
 western
Carmel Mill
Street
Road
Reconstruc3on
Project
from
Elmore
Street
to
South
BLVD












2,000,000


500

Crown
Point

IN

Streets/Roads

Court
Street
Resurfacing














300,000


10

Crown
Point

IN

Streets/Roads

North
Street
Improvements
Servicing
New
I‐65
Interchance














500,000


16

Crown
Point

IN

Streets/Roads

West
Street
Reconstruc3on














850,000


28

Crown
Point

IN

Streets/Roads

Broadwy
Improvements,
including
intersec3ons,
93rd
to
SR231










22,000,000


200

Crown
Point

IN

Water

Northwest
Sewer
Expansion












1,000,000


10

Crown
Point

IN

Water

Addi3onal
Above
Ground
Storage












2,000,000


20

East
Chicago

IN

CDBG












6,000,000


75

East
Chicago

IN

Schools

East
Chicago

IN

Schools

East
Chicago

IN

Schools

East
Chicago

IN

Schools

This
work
shall
include
but
not
limited
to
new
HMA
pavement,
textured
concrete
pavement,
concrete
sidewalk,
 storm
and
sanitary
sewers,
concrete
curb
&
gufers;
new
traffic
signal
at
the
intersec3ons;
landscaping;
and
 ornamental
street
ligh3ng.
 Central
High
School
‐
The
project
consists
of
a
digital
phone
system,
42"
flat
screen
video
monitors,
computers
 and
white
board
technology,
computerized
textbook
inventory
system,
barcode
scanners
in
the
cafeteria,
 technology
2000
lab,
replacement
of
pres Lincoln
Elementary
School
‐
This
project
consists
of
rebuilding
the
school.

The
school
was
originally
erected
in
 1970. Renova3on
of
Block
Jr.
High
School
‐
This
project
consists
of
a
new
fire
system,
ADA
compliance,
swimming
 pool
repairs,
and
maintenance
issues
that
need
to
be
addressed.

The
school
was
originally
erected
in
1968. School
Administra3on
Office
‐
This
project
consists
of
new
access/security
system
for
the
building.

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

Bike
Trail
‐
This
project
consists
of
construc3on
of
a
mul3‐purpose
trail
along
the
Grand
Calumet
River.

It
will
 be
joining
three
city's.

It
will
involve
new
pavement,
sidewalks,
ornamental
ligh3ng,
and
site
elements. East
Columbus
Drive
Beau3fica3on
Project
‐
This
project
once
completed
will
bring
new
thema3c
ligh3ng,
 landmark
elements
at
the
city
limit
and
key
intersec3ons,
pedestrian/bike
pathways,
as
well
as
traffic
 generators,
and
way
finding
signage.

 Neighborhood
Ornmental
Ligh3ng
Project
‐
That
includes
the
placement
of
new
light
poles,
controller
cabinets,
 handholes
throughout
various
streets
in
the
city.

 
Chicago
Avenue;
Cline
to
Kennedy
Avenue
‐
Traffic
Signal
Moderniza3on
and
replacement
of
signal
 interconnect.

This
project
includes
transit
pre‐emp3on,
bus
shelters,
ornamental
ligh3ng,
and
new
ADA
 sidewalk
ramps. 145th
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including
new
 pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.
 Sewer
improvements
shall
include
sepera3 151st
Street
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including
 new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.
 Sewer
improvements
shall
include
s












3,000,000
 








20,000,000
 










3,000,000
 












150,000
 










1,100,000


20












1,150,000


30












1,233,000


30












1,200,000


40












1,450,000


40












1,450,000


40

City

State

Program

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Streets/Roads

East
Chicago

IN

Water

East
Chicago

IN

Water

East
Chicago

IN

Water

East
Chicago

IN

Water

East
Chicago

IN

Water

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

CDBG

Evansville

IN

Energy

Evansville

IN

Housing

Baring
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including
 new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.

 Sewer
improvements
shall
include Indianapolis
Blvd.
Widening;
between
Carrol
and
McShane
‐
This
project
shall
consist
of
curb
reconstruc3on
 and
auxiliary
and/or
parking
lane
widening
at
various
loca3ons
along
Indianapolis
Blvd.

 Magoun
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
 including
new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
 ligh3ng.
Sewer
improvements
shall
include
 Northcote
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
roadway
reconstruc3on
 including
new
pavement
concrete
curb
and
gufer,
concrete
sidewalk,
ornamental
street
ligh3ng,
and
sewer
 sepera3on
of
exis3ng
combined
sewers.

 Tod
Avenue
Reconstruc3on
Project
‐
This
project
shall
include
half
mile
of
roadway
reconstruc3on,
including
 new
pavement,
concrete
curb
and
gufer,
concrete
sidewalk,
a
mul3‐use
path,
and
ornamental
street
ligh3ng.
 Sewer
improvements
shall
include
sep Traffic
Signal
Moderniza3on
and
replacement
of
signal
interconnec3on
‐

The
project
includes
transit
pre‐ emp3on,
bus
shelters,
bike
lockers
at
the
South
Shore
Sta3on,
and
new
ADA
sidewalk
ramps.

 Broadway
Reconstruc3on;
Michigan
to
Guthrie
‐
This
work
shall
include
but
not
limited
to
new
HMA
pavement;
 textured
concrete
pavement;
concrete
sidewalk;
storm
and
sanitary
sewers;
concrete
curb
&
gufers;
new
 traffic
signal
at
the
intersec3on;
landscap Main
Street
Reconstruc3on
‐
This
work
shall
include
but
not
limited
to
a
new
HMA
pavement;
textured
 concrete
pavement;
concrete
sidewalk;
storm
and
sanitary
sewers;
concrete
curb
&
gufers;
new
traffic
signal
 at
the
intersec3on;
landscaping;
and
ornamen Cline
Avenue
Extension
‐
Reconstruc3on
of
exis3ng
interchange
to
add
approximately
1500'
of
new
bridge
and
 a
4
lane
boulevard
to
connect
Broadway
and
Guthrie
Street
intersec3on
to
a
new
bridge
over
Cline
Avenue
(SR
 912)
to
the
exis3ng
interchange
prov Solar
Mixers
Project
‐
The
installa3on
of
three
solar
powered
mixers
in
a
CSO
basin
at
the
Wastewater
 Treatment
Plant. Wind
Turbin
Project
‐
The
installa3on
of
a
wind
turbin
to
supplement
the
Wastewater
Treatment
Plant
power
 supply.

 Bar
Screen
Replacement
Project
‐
The
purchase
and
installa3on
of
new
bar
screens,
washing
systems,
and
 screenings
compac3on
system
at
the
Wastewater
Treatment
Plant. 145th
Street
Lib
Sta3on
Improvements
‐
The
replacement
and
upgrade
of
bar
screens,
pumps
and
controlls
at
 an
exis3ng
stormwater
libing
sta3on. East
Chicago
Water
Treatment
Plant
‐
Construc3on
of
a
new
membrane
Filtra3on
Plant
to
replace
the
city's
 exis3ng
plant,
which
has
outlived
it's
life
expectancy.

 CURB
RAMP
CONSTRUCTION Project
involves
the
construc3on
of
curb
ramps
compliant
with
the
Americans
with
Disabili3es
Act
and
arose
 out
of
a
Voluntary
Compliance
Agreement
entered
into
with
the
Federal
Highway
Administra3on
in
2002
 SIDEWALK
REPLACEMENT Project
u3lizes
the
Barref
Law
(IC
36‐9‐36)
and,
under
a
municipal
ordinance
adopted
in
2004,
enables
 property
owners
to
pe33on
the
City
and
par3cipate
in
the
cost
of
replacing
sidewalks
adjacent
to
their
 property GARVIN
PARK
SHELTER
–
NEW/CONVERT
SHELTER Convert
or
build
a
new
shelter
to
be
available
for
all
months
of
the
year.

The
current
shelters
or
open
air
and
 are
available
only
from
April
to
November.

 WESSELMAN
PARK
SHELTER
–
NEW/CONVERT
SHELTER A
new
or
converted
shelter
in
Wesselman
Park
will
provide
for
more
reunions,
wedding
recep3ons
and
par3es
 for
the
public.

Currently,
we
have
two
duplex
shelters
that
are
open
air.

 KLEYMEYER
SOFTBALL
COMPLEX
–
SPORTS
RENOVATION The
Kleymeyer
Sobball
Complex
was
developed
in
the
1970s
over
a
former
landfill.

The
sobball
fields,
 backstops,
dugouts,
parking
lot
and
concession
stand/restrooms
need
to
be
renovated
 ADA
IMPROVEMENTS
TO
PARKS
–
RESTROOM
MODIFICATIONS,
SIDEWALKS
RAMPS
&
PARKING Modify
and
upgrade
all
public
Park
restrooms
to
accommodate
handicapped
patrons;
designate
parking
spaces
 and
ensure
all
sidewalks
have
ramps
for
handicapped
access.
 BOAT
RAMPS
IMPROVEMENTS
–
INSTALL
PRE‐CAST
CONCRETE Renovate
Angel
Mounds
and
Dogtown
Boat
Ramps
by
installing
new
concrete
sec3ons.

The
exis3ng
ramps
are
 over
30
years
old
and
the
water
edge
of
the
ramps
has
deteriorated
and
has
become
a
problem
 DOWNTOWN
GATEWAYS
AND
WAY‐FINDING
SIGNAGE
‐To
improve
ability
to
navigate
and
locate
des3na3ons
in
 Downtown
Evansville,
the
City
intends
to
create
a
hierarchy
of
gateways
into
Downtown
and
create
districts
 with
a
system
of
way‐finding
signage.

This
p FRONT
DOOR
PRIDE
NEIGHBORHOOD
STREET
AND
STREETSCAPE
IMPROVEMENT‐
The
infrastructure
in
the
 Front
Door
Pride
neighborhood
is
in
dire
need
of
repair
and
improvement.

The
Neighborhood
Stabiliza3on
 Program
funds
along
with
the
exis3ng
CDBG
and
HOME
fund DOWNTOWN
TRAFFIC
SIGNALIZATION
MODERNIZATION
PROJECT‐
Traffic
flow
into,
within
and
around
 downtown
Evansville
will
be
improved
through
this
project.

Aber
conduc3ng
a
Downtown
Traffic
Survey
and
 two
Public
Forums,
the
City
intends
to
implement
numero STRAIGHTEN
MAIN
STREET
SERPENTINE‐When
Main
Street
was
closed
to
traffic
and
became
a
pedestrian
mall,
 a
brick
serpen3ne
roadway
with
no
curbs
was
installed.
 FULTON
AVENUE/RIVERSIDE
DRIVE
STREETSCAPE
ENHANCEMENTS
 The
State
of
Indiana
is
funding
and
reconstruc3ng
the
interchange
at
Fulton
Avenue
and
the
Lloyd
Expressway.

 This
cost
is
es3mated
at
$32
million.
 WESSELMAN
PARK
ELECTRICAL
IMPROVEMENTS
–
PARK
LIGHTS
AND
TRANSFORMERS Upgrade
the
electrical
system
throughout
the
park.

Underground
power
lines
are
over
25
years
old
and
were
 not
put
in
conduit.
The
park
experiences
power
outages
 Kennedy
Towers
building
entry
replacement

Project
Descrip3on

Evansville

IN

Housing

Buckner
Towers
boiler
replacement


Evansville Evansville Evansville Evansville

IN IN IN IN

Housing Housing Housing Housing

Buckner
Towers
domes3c
hot
water
boiler
replacement
 Kennedy
Towers
boiler
replacement Kennedy
Towers
domes3c
hot
water
boiler
replacement White
Oak
Manor
domes3c
water
storage
tanks

Funding
Required

Jobs












1,450,000


40












1,000,000


40












1,450,000


40












1,450,000


40












1,450,000


40












2,374,000


50












6,000,000


75












6,000,000


75










24,000,000


100














200,000


7














210,000


7














609,000


9












1,500,000


10










54,400,000


130














840,000













2,000,000















125,000


1














125,000


1














350,000


4












1,000,000


10












1,500,000


15












2,800,000


22












4,300,000


34












4,600,000


36












4,500,000


36












5,300,000


43














250,000


3
















56,000


3
















45,000
 














31,000
 














45,000
 














31,000
 














62,900


4 4 4 4 4

City

State

Program

Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville Evansville

IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN

Housing Housing Housing Housing Housing Housing Housing Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety

Schnute
Apartments
domes3c
water
storage
tanks Schnute
Apartments
covered
entrance White
Oak
Manor
covered
entrance




















 Buckner
Towers
parking
lot
resurfacing Caldwell
Homes
security
fencing Fulton
Square
Apartments
security
fencing Kennedy
Towers
parking
lot
resurfacing Funding
for
the
Offender
Reentry
Program Laptops
in
all
cars
(122
laptops
&
docking
sta3ons) Outdoor
Firing
Range. Upgrade
connec3vity
at
3
Satellite
offices. Cell
phones
for
all
officers.

There
are
285
officers,
118
currently
have
cell
phones. License
Plate
Recogni3on
Sobware
in
4
cars. Patrol
Rifles
for
all
124
Patrol
Officers. Tasers
for
all
Patrol
Officers.

Only
55
of
124
officers
currently
have
department‐owned
tasers. Video
Cameras
in
all
marked
cars. Addi3on
Liaison
Officer
in
Catholic
High
School
(currently
2
schools
share
one
officer)

Project
Descrip3on

Evansville Evansville Evansville Evansville Evansville Evansville

IN IN IN IN IN IN

Public
Safety Public
Safety Public
Safety Public
Safety Schools Schools

Addi3onal
Secretary
in
Inves3ga3ons. Funding
for
Weed
&
Seed
South
Coordinator
posi3on Record
Room
Civilian
Supervisors. Salaries,
benefits,
uniforms
&
equipment
for
addi3onal
officers
to
serve
proposed
annexa3on
areas. Install
47
thirty‐sta3on
computer
labs
in
elementary,
middle
and
high
schools,
including
two
Project
Lead
the
 Install
80
thirty‐sta3on
wireless
laptop
carts
in
all
school
loca3ons

Evansville

IN

Schools

Install
computers
(300)
for
support
personnel
in
each
school

Evansville

IN

Schools

Evansville

IN

Schools

Evansville

IN

Schools

Install
interac3ve
white
boards,
projectors,
sound
enhancement
systems,
and
document
cameras
in
1,500
 classrooms
@
$7,000
per
classroom
(includes
labor
of
$900
per
room
to
be
done
by
specially
qualified
 installers) Installa3on
and
implementa3on
of
an
on‐demand
digital
content
and
streaming
video
system
for
all
buildings
 in
district.

This
system
includes
hardware
and
sobware
and
will
eliminate
the
need
for
TV
sets
for
classrooms Sobware
licensing
for
these
4,110
new
computers
(Microsob
Office
Suite)
@
$50.00

Evansville

IN

Schools

Bosse
High
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance
boilers.














800,000


5

Evansville

IN

Schools














800,000


5

Evansville

IN

Schools

Delaware
Elementary
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance
 boilers. Reitz
High
School:

Replace
aging,
insufficient
boilers
with
new
high
efficiency
low
maintenance
boilers.














800,000


5

Evansville

IN

Schools














800,000


8

Evansville

IN

Schools














800,000


8

Evansville

IN

Schools














800,000


8

Evansville

IN

Schools

Evansville

IN

Schools












3,900,000


75

Evansville

IN

Streets/Roads

Evansville

IN

Streets/Roads

Evansville

IN

Streets/Roads

Evansville

IN

Streets/Roads

Evansville

IN

Streets/Roads

Evansville

IN

Streets/Roads

Evansville

IN

Transit

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Bosse
Enlow
Field
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance
 free
care. Central
High
School
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance
 free
care. Reitz
High
School
Stadium:

Install
ar3ficial
turf
in
place
of
lawn
turf
for
water
conserva3on
and
maintenance
 free
care. Posi3ons
needed
to
support
addi3onal
technology
listed
above
(interac3ve
white
boards,
projectors,
sound
 enhancement
systems,
and
document
cameras
in
classrooms;
30‐sta3on
computer
labs
in
47
schools;
80
30‐ sta3on
wireless
laptop
carts; Technology
&
Innova3on
Center:

Build
a
new
state
of
the
art
technology
center
that
is
LEED
cer3fied. BUENA
VISTA
ROAD
IMPROVEMENTS
(FULTON
AVE.
TO
EAST) Project
includes
pavement
reconstruc3on
and
improved
geometrics
at
the
intersec3on
of
Fulton
Avenue
and
 Buena
Vista
Road,
as
well
as
replacement
of
failing
retaining
wall
structures
at
that
intersec3o BURKHARDT
ROAD
IMPROVEMENTS
(LLOYD
EXPWY.
TO
LINCOLN
AVE.) Project
will
alleviate
vehicular
conges3on
and
improve
safety
through
the
construc3on
of
added
travel
lanes
 and
associated
improvements
on
Burkhardt
Road
between
State
Route
66
(Lloyd
Expressway LINCOLN
AVENUE
ROAD
IMPROVEMENTS
(KIRKWOOD
DR.
TO
CITY
LIMITS) Project
includes
road
and
drainage
improvements
to
the
exis3ng
two‐lane
pavement,
as
well
as
widening
to
 accommodate
bicyclists;
 PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PHASE
3
–
PEDESTRIAN/BICYCLE
TRAIL
The
 Industrial
Corridor
Phase
3
con3nues
the
Greenway
Passage
from
Phase
2
and
follows
along
the
Pigeon
Creek
 levee
to
Louisiana
Street. PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PHASE
2
‐
PEDESTRIAN/BICYCLE
TRAIL
The
 Industrial
Corridor
Phase
2
is
the
con3nua3on
of
the
Pigeon
Creek
Greenway
Passage.
Phase
2
starts
at
 Franklin
Street
and
follows
the
Pigeon
Creek
to
Lamasco
Park PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PH
4
–
VIADUCT
The
Industrial
Corridor
Phase
4
 is
a
viaduct
along
the
Pigeon
Creek.
Due
to
poor
soil
condi3ons
a
viaduct
will
need
to
be
constructed
to
ensure
 proper
access
along
the
creek.
 PIGEON
CREEK
GREENWAY
PASSAGE
‐
INDUSTRIAL
CORRIDOR
PH
4
–
VIADUCT The
Industrial
Corridor
Phase
4
is
a
viaduct
along
the
Pigeon
Creek.

Due
to
poor
soil
condi3ons
a
viaduct
will
 need
to
be
constructed
to
ensure
proper
access
along
the
creek. ALVORD
SEWER
REPAIR Failing
joints
in
a
60‐inch
reinforced
concrete
sewer
under
Alvord
Boulevard
has
created
voids
under
the
 pavement
causing
road
failures.
Repair
would
involve
replacing
joint
seals
in
5,000
feet
of
60‐inch
reinforced
 concrete
sewer. CASS
AVENUE
SEWER
SEPARATION
AND
DRAINAGE
IMPROVEMENT
PROJECT The
Cass
Avenue
Sewer
Separa3on
Project
is
located
on
the
south
side
of
City
of
Evansville,
east
of
the
Ohio
 River.
 DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
I Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the
 installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
 Heidelbach

Funding
Required 














62,900
 












104,000
 












104,000
 












117,000
 












121,000
 














87,000
 












117,000
 














39,000
 










1,220,000
 












500,000
 












120,000
 














73,920
 












120,000
 














99,200
 














51,750
 












570,000
 














76,350
 














41,768
 














46,147
 












105,000
 












606,681
 










1,410,000


Jobs

5 6 6 8 8 8 8

0 0 0 0 0 1 1 1 3 9












2,400,000
 












300,000











10,500,000
 












400,000
 












205,500


9














550,000













4,737,168













1,120,500















750,000


8












2,400,000


25












2,800,000


28












2,800,000













2,000,000











19,468,000













2,800,000


City

State

Program

Evansville

IN

Water

Project
Descrip3on

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Evansville

IN

Water

Fort
Wayne

IN

Airport

SEPTIC
TANK
ELIMINATION
ON
CAVE
AVENUE
 Construc3on
of
a
gravity
sewer
and
lib
sta3on
to
service
100
homes
on
failing
sep3c
systems
on
the
west
side
 of
Evansville. SEPTIC
TANK
ELIMINATION
ON
FICKAS
ROAD




 Construc3on
of
a
gravity
sewer
and
lib
sta3on
to
service
twelve
homes
on
failing
sep3c
systems
on
the
east
 side
of
Evansville. SOUTHEAST
AVENUE
AND
BROOKSIDE
DRIVE
SEWER
SEPARATION
AND
DRAINIAGE
IMPROVEMENT
PROJECT The
Southeast
Boulevard
&
Brookside
Drive
Sewer
Separa3on
Project
is
located
on
the
south
side
of
the
City
of
 Evansville,
east
of
Ohio
River.

 STATE
HOSPITAL
LAKES
DRAINAGE
IMPROVEMENTS Project
involves
increasing
the
storage
capacity
of
the
lakes
at
the
Evansville
State
Hospital;
in
conjunc3on
with
 recently
completed
improvements,
provides
drainage
relief
to
the
residen3al
areas
along
Colony WEINBACH/BOEKE/LLOYD
DRAINAGE
IMPROVEMENTS Project
will
alleviate
long‐standing
drainage
problems
near
the
intersec3on
of
Division
Street
and
Boeke
Road
 through
the
installa3on
of
a
large
diameter
storm
sewer
that
will
be
connected
to
the
Weinbach
Aven WEINBACH/KECK
DRAINAGE
IMPROVEMENTS Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the
 installa3on
of
storm
sewers
in
the
area
approximately
bounded
by
Diamond
Avenue,
Weinbach
Avenue,
U.S.
 41
and
State
Rou D&E
Runway
13/31
Overlay
&
Electric
Imrpovement

Fort
Wayne

IN

Airport

D&E
Runway
32
Rehab.

Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne

IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN

Airport Airport Airport Airport Airport Airport Airport CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Housing Public
Safety Public
Safety Public
Safety Public
Safety Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads

ALP
&
Master
Plan
Update Airfield
Signage
Improvement
Project Airfield
Signage
Improvement
Project
Phase
II Rewire
Runway Perimeter
Security
Fence T‐Hangar
Replacement Runway
13/31
Overlay
&
Electric
Improvements Small
Business
Revolving
Loan
Fund Coombs
Street
Realingment Calhoun
Street
Conversion Gingerbread
House
Daycare
Development South
Urban
Trail North
Anthony
Corridor
Infrastructure Park
Roads
and
Parking
Lot
Resurfacing Wells
Street
Infrastructure Alley
Rehabilita3on Commercial
Facade
Program Community
Health
Center North
River
Redevelopment
(Acquisi3on,
Brownfield
Site
Prep.,
Infrastructure) Renaissance
Pointe
YMCA Renaissance
Ponte
Phase
II
Infrastructure Owner‐occupied
Housing
Rehab. Energy
Efficient
Appliance
Grant City
Solar
&
Wind
Program Weatheriza3on
Grants Green
Technology
Center Brooklyn
Manor
II 30
Tasers AFIS
Upgrade 3
School
Resource
Officers 5
Officers
for
Neighborhood
Response
Team
Enhancement School
Infrastructure
23
Elementary
Schools
8
Middle
Schools Coliseum
Blvd
Trail
and
Riverbank
re‐enforcement

‐
0.7
miles Columbia
Street
over
Delta
Lake
bridge
reconstruc3on East
State
Blvd
sidewalk
‐
connect
11
neighborhoods
with
5
schools Meijer
Road
@
Trier
Ditch
bridge
reconstruc3on

DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
II Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the
 installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
 Heidelbach DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
III Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the
 installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
Evans
Ave DIAMOND
AVENUE
DRAINAGE
IMPROVEMENTS
‐
PHASE
IV Provides
drainage
relief
and
separa3on
of
storm
water
from
the
combined
sewer
system
through
the
 installa3on
of
a
large
diameter
storm
sewer
in
the
area
approximately
bounded
by
Diamond
Avenue,
Evans
 Ave EASTVIEW
DRAINAGE
IMPROVEMENT
PROJECT








 The
project
will
construct
a
new
storm
sewer
trunkline
from
the
K‐3
Lib
Sta3on
ponding
area
to
the
 intersec3on
of
Michael
Avenue
and
Margybeth
Avenue.
The
exis3ng
trunkline
would
be
removed.
 JEANETTE

DRAINAGE
IMPROVEMENT
PROJECT The
project
will
construct
a
new
15‐inch
storm
pipe
along
Hicks
Drive.
This
sewer
line
would
drain
to
a
36‐inch
 storm
sewer
that
would
run
west
to
Jeanefe
Avenue.
At
Jeanefe
Avenue
the
sewer
would
be
upsized
 MT.
AUBURN
SEPTIC
TANK
ELIMINATION The
Mt.
Auburn
Neighborhood
topography
consists
of
steep
highland
and
floodplains.
This
topography
has
led
 to
the
poten3al
of
on‐site
wastewater
system
failures.
In
short,
while
the
roadways
exist
above
floodplain
eleve

Funding
Required

Jobs












2,800,000













2,900,000













4,900,000













5,500,000













3,500,000













4,500,000















500,000















125,000











24,722,000















585,000













1,600,000













1,100,000
 














81,300


2














375,000
 












650,000
 












225,000
 












375,000
 












275,000
 












400,000
 












650,000
 










1,260,000
 










1,500,000
 












200,000
 










1,300,000
 












500,000
 










1,500,000
 












700,000
 










1,000,000
 










1,100,000
 










2,000,000
 










1,000,000
 










1,000,000
 








10,000,000
 










4,000,000
 










5,000,000
 










2,000,000
 










1,000,000
 










2,400,000
 










2,000,000
 










2,500,000
 












500,000
 














24,000
 












500,000
 












240,000
 












400,000
 






301,100,000
 












450,000
 












500,000
 












500,000
 












500,000


4 5 8 8 10 12 15 25 25 30 30 30 40 40 40 80 80 80 80 80 80 120 3 5 15 50 10

3 5 900 25 25 25 25

City

State

Program

Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne

IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

South
Town
Center
trail
‐
1.2
miles Towpath
trail
‐
1
mile Bella
Vista
Drive
over
Fairfield
Ditch
bridge
reconstruc3on Jefferson
Pointe
Trail
‐
1
mile Paulding
Rd
over
Trier
Ditch
bridge
reconstruc3on Produc3on
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on South
Bend
Drive
over
Graham
McCulloch
Ditch
bridge
reconstruc3on State
Blvd
over
Bullerman
Ditch
bridge
reconstruc3on State
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on Trier
Road
over
Bullerman
Ditch
bridge
reconstruc3on Washington
Center
Rd
over
Spy
Run
Creek
bridge
reconstruc3on Cougar
Trail
.82
miles Progress
Blvd
over
Spy
Run
Creek
bridge
reconstruc3on Washington
Center
Road
@
Dartmouth
Intersec3on
reconstruc3on West
Jefferson
Blvd
over
Graham
McCulloch
Ditch
bridge
reconstruc3on Concrete
Curb
repair
‐
12
miles Beckefs
Run
Trail
(St.
Joe
River
to
Coldwater
Rd)
‐
3.5
miles New
York
Central
Rail
to
Trail
‐
2.5
miles Power
&
Energy
Trail
‐

2
miles Aboite
Trails
‐
13
miles Johnny
Appleseed
to
Shoaff
Park
trail
‐
3
miles Maplecrest
Arterial
extension Spring
Street
over
Conway
RR
bridge
reconstruc3on Auburn
Road
reconstruc3on
widening
and
trail
connec3on Wayne
Trace
Arterial
reconstruc3on
widening Covington
Rd
trail
‐
5.5
miles Sidewalk
construc3on
to
connect
neighborhoods
&
reconstruc3on
of
poor
conditon
sidewalks Ardmore
Avenue
Arterial

reconstruc3on
widening
and
trail
connec3on Mar3n
Luther
King
US
27

Bridge
reconstruc3on

Project
Descrip3on

Fort
Wayne

IN

Streets/Roads

Fort
Wayne

IN

Streets/Roads

Fort
Wayne

IN

Streets/Roads

Fort
Wayne

IN

Transit

Residen3al
Concrete
Street
repair

55
miles
in
poor
or
very
poor
condi3on;
2009
would
include
10
of
these
 miles. ADA
Ramp
requirements
30%
of
city
s3ll
in
non‐compliance
at
an
es3mated
cost
of
$10,000,000.
10%
of
the
 30%
to
be
completed
2009 Arterial
Concrete
Street
repair
10
miles
in
system
in
poor
or
very
poor
condi3on;
2009
would
include
6
of
these
 miles. IPFW‐Ivy
Tech
Circulator

Fort
Wayne

IN

Transit

Northside
Terminal

Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne Fort
Wayne

IN IN IN IN IN IN IN IN IN

Transit Transit Transit Transit Transit Transit Water Water Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

New
NW
Route Headquarters
HVAC Restore
Service
Cuts Downtown
Circulator Rebuild
Baker
Street
Sta3on Superior
Street
Sta3on Beckman
Drain
Improvements,
Improvements
to
stormwater
ditch
to
reduce
local
flooding Mardego
Hills
Stormwater
Sytem
Improvements,
Improvements
to
local
stormwater
sewer
system
 Smith
Street
at
Roosevelt
&
Fairfax
‐
Phase
2
Sewer
Sepera3on,
New
storm
sewers
to
reduce
combined
sewer
 overflows
and
local
sewer
capacity
issues Southtown
Centre
Stormwater
System
and
Trail,
Improvements
to
local
stormwater
system
performance
to
 reduce
local
flooding Ewing
Street
Storm
Sewer,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
capacity
 issues Renaissance
Pointe
Stormwater
Basin,
New
deten3on
basin
to
reduce
combined
sewer
overflows
and
local
 sewer
capacity
issues Spy
Run
Creek
Channel
and
Deten3on
Improvements,
Improvements
to
stormwater
ditch
to
reduce
local
 flooding Collec3on
System
Monitoring
and
Control
Improvements
‐
Installa3on
of
facili3es
to
improve
system
real‐3me
 opera3ons
and
reduce
overflows

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Aboite
Center
Water
Main
Extension,
New
main
to
improve
system
reliability,
capacity
and
pressure
and
 provide
for
system
expansion Anthony
Wayne
Village
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance
 costs
and
poor
performance Bluffton
Road
&
Lower
Hun3ngton
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
 maintenance
costs
and
poor
performance Drexel,
Trentman,
Oxford:
Queen
to
Wayne
Trace
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
 with
high
maintenance
costs
and
poor
performance Klaehn‐Merrif
Drainage
System
(Illinois
Road)Improvements
to
local
stormwater
sewer
system
performance
to
 reduce
local
flooding Riverside,
Hannas,
Paramount
Addi3ons
‐
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
 maintenance
costs
and
poor
performance Rothman
SSD
Ellimina3on,
New
relief
sewer
to
eliminate
sanitary
overflows
and
increase
capacity Southwest
Interceptor
CIPP ‐
Rehabilita3on
and
cleaning
of
sewer
to
improve
structural
integrity
and
capacity State
Road
1
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance
costs
and
poor
 performance State
Road
3
Water
Main
Replacement,
Replacement
of
exis3ng
mains
with
high
maintenance
costs
and
poor
 performance

Funding
Required 












360,000
 












400,000
 












750,000
 












800,000
 












625,000
 












625,000
 












625,000
 












750,000
 












750,000
 












625,000
 












625,000
 












700,000
 












875,000
 










1,200,000
 










1,125,000
 










1,500,000
 










1,500,000
 










1,700,000
 










1,500,000
 










8,000,000
 










3,000,000
 










2,000,000
 










2,500,000
 










2,500,000
 










3,000,000
 










5,500,000
 










5,000,000
 










6,500,000


Jobs 25 25 30 30 30 30 30 30 30 30 30 35 35 35 35 40 50 50 50 55 60 60 60 70 70 80 80 85












8,000,000


100












7,200,000


100












3,333,333


125










12,000,000


160














639,000


2














500,000
 












360,000
 












200,000
 










2,000,000
 










4,000,000
 










4,500,000
 












300,000
 












450,000
 












900,000


2 3 4 7 8 60 60 0.25 0.5














900,000


0.5














500,000


0.5












3,000,000


0.75












2,200,000


0.75












3,000,000


0.75














725,000


5














750,000


7












2,000,000


7














600,000


7














600,000


7














700,000


7












1,275,000


7














660,000


7












1,750,000


7














750,000


7












1,500,000


7

City

State

Program

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Fort
Wayne

IN

Water

Gary

IN

Airport

Gary

IN

Airport

Gary

IN

Airport

Gary

IN

Airport

Gary

IN

Amtrak

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Gary

IN

CDBG

Project
Descrip3on Union
Chapel
Road
Water
Main
Extension:

Tonkel
to
Puff,
New
main
to
improve
system
reliability,
capacity
and
 pressure Warfield
SSD
Ellimina3on,
New
relief
sewer
to
eliminate
sanitary
overflows
and
increase
capacity Webster
Street
Storm
Sewer
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
capacity
 issues Lake
Avenue
Feeder
Main
Project
Phase
3,
New
transmission
main
for
NE
area
of
system
for
improvements
to
 capacity
and
pressure
in
area Maplecrest
Water
Main
Extension,
New
transmission
main
for
NE
area
of
system
for
improvements
to
capacity
 and
pressure
in
area Airport
Expressway
Water
Main
Extension,
New
main
to
improve
system
reliability,
capacity
and
pressure
and
 provide
for
system
expansion Maplewood
Park
Stormwater
Improvements‐Improvements
to
local
stormwater
sewer
system
performance
to
 reduce
local
flooding

Funding
Required

Jobs














300,000


7












1,435,000


7














525,000


7














800,000


8












1,450,000


8












4,000,000


9












1,550,000


9

NW
Pressure
Zone
Pumping
Improvements‐Rehabilita3on
of
pump
sta3ons
to
improve
reliability
and
increase
 capacity Subbassin
R14033
Sewer
Separa3on,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
 capacity
issues Vance
&
Woodrow
Sewer
Separa3on,
New
storm
sewers
to
reduce
combined
sewer
overflows
and
local
sewer
 capacity
issues West
Lawn
Sep3c
Elimina3on
Project,
New
sanitary
sewer
system
for
neighborhood
with
failed
sep3c
systems














350,000


9












3,550,000


9












3,250,000


9












5,500,000


9

Large
Diameter
Interceptor
Cleaning
&
Lining
Package,
Rehabilita3on
and
cleaning
of
large
diameter
sewers
to
 improve
structural
integrity
and
capacity Lime
Conveyance
Upgrades‐Replacement
of
exis3ng
control
system
components
to
improve
opera3ons












8,100,000


10














600,000


10

NW
Feeder
Main
‐
Phase
3,
New
transmission
main
for
NW
area
of
system
for
improvements
to
capacity
and
 pressure
in
area St
Joe
‐
Beckef
Relief
Sewer
‐
Phase
1,
New
relief
sewer
to
increase
capacity












5,500,000


10












4,750,000


10












2,200,000


10












2,100,000


12










10,880,000


15










14,500,000


15












3,775,000


20












6,830,000


20












5,800,000


20










15,540,000


25












1,200,000


8












3,571,684


10














700,000


20










15,000,000


50












3,500,000


30












1,500,000


15












1,000,000


25












7,000,000


25












2,000,000


25










19,000,000


35












3,000,000


45










18,000,000


75










20,000,000


80

St.
Joseph
Dam
Structural
Rehabilita3on,
Rehabilita3on
of
concrete
dam
structure
to
ensure
structural
integrity
 of
dam Filter
Valve
and
Filter
Bed
Improvements,
Replacement
of
valves
and
filter
bofoms
to
improve
reliability
of
 filters
and
water
quality Combined
Sewer
Overflow
Pond
Improvements,
Construc3on
of
new
grit
facili3es,
and
cleaning
and
structural
 improvements Upper
Ely
Run
Interceptor
Phase
1,
New
relief
sewer
to
increase
capacity Aera3on
System
Improvements‐
Phase
2,
2nd
phase
of
improvements
to
Aerea3on
system
to
improve
 performance
&
reliability Digester
Improvements
Phase
2
(Gas
&
Safety),
2nd
phase
of
improvements
to
Digestors
to
improve
 performance
&
reliability Filtra3on
Plant
Finished
Water
Reservoir
Improvements
Structural
improvements
and
modifica3ons
to
 reservoir
to
improve
opera3ons
reliability St
Joe
‐
Beckef
EQ
basin,
New
storage
basing
to
improve
capacity
during
wet
weather
events Airport
Road
/
Industrial
Blvd.
Roadway
Rehabilita3on:
Project
is
defined
by
the
rehabilita3on
of
the
exis3ng
 roadway
&
pavement.

Currently
the
roadway
is
severely
deteriorated.

This
road
serves
as
a
connector
to
Gary‐ Chicago
Interna3onal
Airport,
s Gary‐Chicago
Interna3onal
Airport:
Project
consists
of
construc3ng
two
high‐speed
exit
taxiways,
apron
 construc3on
for
the
Foreign
Trade
Zone
hanger,
the
construc3on
of
T‐Hangars,

and
the
expansion
/
 construc3on
of
corporate
hangars. Gary‐Chicago
Interna3onal
Airport
Fire
Equipment
Moderniza3on:

Project
will
bring
new
rescue
&
firefigh3ng
 equipment
and
a
new,
dedicated
hanger.
Such
equipment
and
infrastructure
is
crucial
for
the
current
runway
 expansion
project
and
the
traffic
gen Airport
Road
/
Industrial
Avenue
Overpass:

Project
includes
building
an
overpass
on
this
roadway
that
would
 crossover
the
EJ&E
and
CSX
railroad
tracks.


This
overpass
will
eliminate
a
current
at‐grade
crossing
and
help
 with
traffic
and
freight
circula3 Union
Sta3on
Amtrak
&
Green
Link
Welcome
Center
brings
crucial
reac3va3on
of
a
downtown
Amtrak
stop.
 This
mixed‐use
project
is
defined
by
adap3vely
reusing
the
exis3ng
historic
sta3on
for
public
transit
and
non‐ motorized
transporta3on
(tri‐state
pe Barbara
Leek
Wesson
Neighborhood
Center
Moderniza3on:
This
center
brings
various
opportuni3es
to
an
 underserved
popula3on
in
the
Mid‐Town
community.
Via
this
project,
the
center
will
be
rehabilitated
for
a
 con3nued
20‐yr
lifecycle.
This
rehabilita3on Brownfield
Field
Clean
Up:
Environmental
assessments
for
the
proposed
target
sites
indicate
that
clean
up
will
 be
necessary
for
the
re‐use
of
these
challenged
parcels.

This
project
requests
clean
up
dollars
for
a
minimum
 of
10
brownfields
sites
thus
resu City
Wide
Buildings,
ADA
&
General
Improvements:

Improve
numerous
city‐owned
buildings
to
meet
ADA
 compliance
and
to
general
moderniza3on.

Buildings
included:
City
Hall,
Adam
Benjamin
Metro
Center,
GPTC
 Admin
Building,
Genesis
Center,
Hudso
Campbell,
P Crea3ng
Green
Infrastructure
through
Vacant
Property
Management

and
Neighborhood
Beau3fica3on:
This
 project
would
employ
and
train
residents
and
youth
to
clean
up
and
clear
a

minimum
of
100
vacant
lots
in
the
 city
for
the
purpose
of
securing,
crea3n Gary
Marina:

Project
is
to
develop
the
municipal
marina
at
the
lakefront
west
footprint.

Such
a
marina
would
 bring
350+
boa3ng
slips,
a
boat
launch,
and
associated
land
base
infrastructure
such
as
storage,
maintenance
 facili3es,
etc.

The
marina
will
 Neighborhood
Center
Capital
Improvement
Strategy:

This
request
will
bring
new
neighborhood
centers
for
the
 Glen
Park,
Tolleston,
and
Miller
communi3es.


Via
the
crea3on
of
these
three
centers,
low‐to‐moderate
 income
families
will
be
provided
public
se Fire
Sta3on
Capital
Improvement
Plans
:
The
Construc3on
of
New
Buildings
for
Various
Fire
Sta3ons
(Six
New
 Buildings) Department
of
Redevelopment,
Scafered
Site
Redevelopment
Areas:
Acquisi3on,
Demoli3on,
and
 Environmental
Remedia3on


City

State

Program

Gary

IN

Energy

Gary

IN

Housing

Gary

IN

Housing

Gary

IN

Housing

Gary

IN

Housing

Gary

IN

Housing

Gary

IN

Housing

Installa3on
of
Solar
Panels
and
Energy
Retrofits
of
City‐Owned
Buildings:
Project
will
address
publicly
owned
 buildings
that
are
not
energy
efficient,
that
cost
unnecessary
thousands
in
u3lity
bills,
and
that
do
not
provide
 good
examples
to
the
public
o Gary
Housing
Authority:
Demoli3on
of
Ivanhoe
Gardens
Public
Housing
development.

Ivanhoe
received
 approval
of
their
demoli3on
applica3on
for
Ivanhoe
in
2007.

However,
due
to
numerous
contribu3ng
factors
 the
project
has
not
begun. Gary
Housing
Authority:
Demoli3on
of
Por3on
of
Delaney
West
Public
Housing
Development
deconcentra3on
 efforts
by
removing
approximately
42
buildings Gary
Housing
Authority:
Demoli3on
of
por3on
of
Dorie
Miller
Public
Housing
Development's
decentra3on
 efforts
by
removing
approximately
14
buildings Gary
Housing
Authority:
Blue
Light
Security
Camera
System
for
Gary
Public
Housing
Developments
as
well
as
 Visibility
for
some
city
streets Gary
Housing
Authority:
Repair
of
roads
and
sewage
and
water
systems
at
Dorie
Miller
Public
housing
 development Gary
Housing
Authority:
Development
of
700
replacement
housing
units.

Project
Descrip3on

Gary

IN

Public
Safety

Gary

IN

Public
Safety

Gary

IN

Public
Safety

Gary

IN

Public
Safety

Gary

IN

Gary Gary

Funding
Required

Jobs












3,000,000


15












1,200,000


20














630,000


20














210,000


20












1,500,000


30












4,500,000


50








105,000,000


150

Police
Vehicle
Purchase
&
Replacement














420,000


3

Police
Equipment
Moderniza3on:
New
launchers,
new
uniforms,
tac3cal
plates
for
our
for
our
bullet
proof
vest,
 fire‐resistant
suits,
weaponry
(sniper
rifles
and
sub‐automa3c

machine
guns),
recon
robot,
tac3cal
camera,
 tac3cal
blankets,
armored
vehicl Fire
Department
Vehicle
Replacement














750,000


4














595,000


6












4,852,900


8

Public
Safety

Fire
Department
Equipment
Moderniza3on:
Requests
include
the
purchase
of
6
new
fire
engines,
2
fire
trucks,
 1
tanker
truck,
4
ambulances,
1700
feet
of
5
IN
hose,
Hurst
extrac3on
equipment,
new
ladders,
high
pressure
 air
bags
and
pressure
chisels, Hiring
Firefighters












4,000,000


20

IN

Public
Safety

Hiring
Police
Officers












4,000,000


25

IN

Streets/Roads

Gary
Green
Link,
Phase
II:
Project
con3nues
combined
bicycle
and
pedestrian
trail
westward
to
Gary‐Hammond
 border.

The
trail
serves
as
the
major
east‐west
connector
through
Gary
to
the
Calumet
/
Tri‐State
Trail.














1,250,000


15

Gary

IN

Streets/Roads












9,000,000


60

Gary

IN

Streets/Roads










10,500,000


70

Gary

IN

Streets/Roads










30,000,000


85

Gary

IN

Transit

Ridge
Road,
Broadway
to
Grant
Street:
Project
will
reconstruct
this
por3on
of
Ridge
Road.

Ridge
Road
is
an
 alterna3ve
arterial
roadway
to
the
Borman
Expressway.
This
request
will
help
finish
the
project.

City
is
 currently
moving
forward
on
Broadway
ea Lakefront
Marina
Access
Road,
Phase
2A,
Segment
3:
Project
is
to
construct
new
access
roadway
and
bridge
 east
of
Center
Road.

Project
will
remove
extant
vehicular
access
challenges
to
the
lakefront
west
development
 area.
 Department
of
Public
Work
&
Safety,

 Pavement
Rehabilita3on
Including
Curb
and
Sidewalk
Replacement: 6th
District
‐
34
Streets;
5th
District
‐
34
Streets;
4th
District
‐
34
Streets;
3rd
District
‐
33
Streets;
2nd
District
‐
 38
Streets;
1st
District
 GPTC
Financial
Computer
Systems
Update














200,000


2

Gary

IN

Transit

GPTC
Fleet
Maintenance
Computerized
Systems














200,000


2

Gary

IN

Transit














400,000


4

Gary

IN

Transit












2,100,000


18

Gary

IN

Water

GPTC
Radio
Communica3on
Systems,
Radio
Towers.
Used
for
both
local
and
Regional
bus
routes
served
by
the
 transporta3on
corpora3on. GPTC
Fleet
Moderniza3on:
Request
is
for
the
purchase
of
6
full
size,
35
b
buses.
Each
new
bus
costs
$350,000
 each. Gary
Sanitary
District:
Administra3on
Building
Improvements














255,000


1

Gary

IN

Water

Gary
Sanitary
District:
Instrumenta3on
(SCADA)
and
security
(to
be
phased)














500,000


1

Gary

IN

Water

Gary
Sanitary
District:
Removal
System














500,000


1

Gary

IN

Water

Gary
Sanitary
District:
Sludge
Degrifers














500,000


1

Gary

IN

Water

Gary
Sanitary
District:
Sewage
Pumps
Replacement














765,000


2

Gary

IN

Water

Gary
Sanitary
District:
Rehabilita3on
of
the
Filter
Building.










17,500,000


4

Gary

IN

Water

Gary
Sanitary
District:
Primary/intermediate
Clarifier
Drain
Valve
Replacements












1,500,000


5

Gary

IN

Water

Gary
Sanitary
District:
Office
/
Administra3ve
Building
Upgrades












2,900,000


14

Gary

IN

Water

Gary
Sanitary
District:
W.A.S
Thickening












4,000,000


14

Gary

IN

Water

Gary
Sanitary
District:
Equaliza3on
Basin
(WWTP)










15,251,000


17

Gary

IN

Water












4,530,000


28

Gary

IN

Water

Gary
Sanitary
District:
Cover
Replacements,
Explosion
Proof
Sump
Pumps,
Install
Dual
Flame
Arrestors,
Dual
 Isola3on
Valves
on
Primary
Digesters,
High
level
alarm
failsafes
for
digesters,
Boiler
Replacement
Project Gary
Sanitary
District
building
upgrades












7,500,000


49

Gary

IN

Water

Gary
Sanitary
District:
Digester
Improvements










14,087,000


55

Gary

IN

Water

Gary
Sanitary
District:
Screening,
Grit
Removal
&
Pumping
Sta3on










50,099,000


65

Hammond

IN

CDBG












6,889,125


200

Hobart

IN

CDBG












3,000,000


70

Hobart

IN

CDBG










10,000,000


70

Hobart

IN

Energy












2,000,000


50

Hobart

IN

Public
Safety














120,000


6

Hobart

IN

Public
Safety

3rd
District
Street
Reconstruc3on
projects
(8
Streets)
work
to
include
storm,
sanitary,
and
water
main
 infrastructure,
street
ligh3ng,
and
new
road
surface Construct
new
Community/Senior
Center
to
replace
community
center
building
damaged
by
recent
flooding
 that
can
not
be
rebuilt
in
its
current
loca3on
or
rehabbed.
 Conversion
of
former
Hobart
Middle
School
into
City
government
facility
to
house
Police
Department
and
City
 Court Renova3on
of
exis3ng
City
Hall
to
include
energy
saving
technologies
such
as
new
HVAC
system,
energy
 efficient
windows,
solar
power,
etc.
 Computer/Thinkpad
upgrades
to
Police
Vehicles
to
aid
in

communica3ons
between
and
among
law
 enforcement
personnel/agencies Purchase
10
E85
fueled
Police
vehicles
for
fleet
to
reduce
future
opera3onal
expenses

Hobart

IN

Public
Safety

Hire
addi3onal
10
Police
Officers
to
bring
force
up
to
standards
for
community
size

Hobart Hobart

IN IN

Schools Schools

Hobart

IN

Hobart Hobart














200,000


6

Fitness
track
installa3on
at
Hobart
Middle
School Replace
floors
and
roofs
at
four
Hobart
Elementary
Schools














800,000
 












500,000


10 10












2,500,000


40

Schools

Construc3on
of
swimming
pool
at
Hobart
High
School












7,000,000


50

IN

Schools

Technology
Upgrades
at
four
Hobart
Elementary
Schools












2,600,000


80

IN

Schools

Installa3on
of
various
computer
technology
needed
at
Hobart
Middle
School












1,200,000


90

City

State

Program

Hobart

IN

Streets/Roads

Hobart

IN

Streets/Roads

Hobart

IN

Streets/Roads

Hobart

IN

Streets/Roads

Hobart

IN

Streets/Roads

Hobart

IN

Water

Construc3on
of
Hobart's
Second
Phase
of
the
Oak
Savannah/Lake
George
Regional
Bike
Trail
which
serves
two
 Northwest
Indiana
coun3es Colorado
Street
improvement/intersec3on
upgrade
from
US
30
south
to
City
limit
to
support
access
to
areas
 available
for
industrial
development Installa3on
of
pre‐fab
pedestrian
bridge
&
construc3on
of
linking
bike/hike
trail
to
provide
access
to
two
parts
 of
Fred
Rose
Park
separated
by
Lake
George;
part
of
the
larger
Oak
Savannah/Lake
George
trail
system
through
 Hobart 69th
Avenue
reconstruc3on
from
Colorado
Street
to
Mississippi
Street
to
support
industrial
development
 access West
Ridge
Road
(37th
Avenue)
widening/improvement
from
City
limit
to
I‐65
to
complete
Hobart's
sec3on
of
 this
transporta3on
corridor
which
serves
as
an
I‐80/94
Borman
Expressway
reliever
for
local
traffic Insituform
lining
of
exis3ng
City
sewers
to
extend
useful
life
of
infrastructure

Project
Descrip3on

Hobart

IN

Water

Indianapolis

IN

CDBG

Indianapolis

IN

Indianapolis

Funding
Required

Jobs














400,000


8












2,200,000


30












1,000,000


30












6,000,000


50














920,000


50












3,000,000


10

Sewer
manhole
rehabilita3on
at
various
loca3ons
within
Hobart
Sanitary
District
territory














500,000


10














100,000


1

CDBG

Con3nually
repair
and
replace
hardware,
irriga3on
and
materials
in
12
gardens
and
gateways,
including
1‐ 70/Illinois,
West
Street
and
Capitol
Gateways. Refurbish
poles
and
sign
boxes
of
10‐year
old
system.
Add
new
signs
as
needed.














400,000


2

IN

CDBG

Bike
Lanes












1,000,000


5

Indianapolis

IN

CDBG

Traffic
Signal
System
Improvements












1,000,000


5

Indianapolis

IN

CDBG

Local
Bridge
Rehabilita3ons












1,500,000


7

Indianapolis

IN

CDBG

ADA
Ramp
Installa3ons












2,000,000


10

Indianapolis

IN

CDBG

Alley
Program












2,000,000


10

Indianapolis

IN

CDBG

Contractor
Crack
Sealing












2,000,000


10

Indianapolis

IN

CDBG












4,000,000


10

Indianapolis

IN

CDBG

Green
Infrastructure/Green
Street
Elements:
Money
would
be
used
to
fund
green
infrastructure
and
green
 street
elements
in
currently
scheduled
transporta3on
projects.

As
new
infrastructure
and
transporta3on
 elements
come
online,
we
need
to
include
money Replace
and
reposi3on
200
planters.

Add
addi3onal
planters
in
key
areas.












2,000,000


10

Indianapolis

IN

CDBG

Sidewalks
and
curbs












3,000,000


15

Indianapolis

IN

CDBG

Street
lights
and
other
street
furniture,
including
newsbox
modulars;
Refurbish
or
replace
deteriorated.

Add
 new
as
needed.












3,000,000


15

Indianapolis

IN

CDBG












5,000,000


25

Indianapolis

IN

CDBG

Just
beyond
the
new
Lucas
Oil
Stadium,
streetscape
infrastructure
improvements
are
needed
from
Georgia
to
 Morris
streets
and
from
Pennsylvania
to
West
streets
to
enhance
public
safety.

Specifically,
ligh3ng,
paving,
 landscaping
and
sidewalks
need
to
be
 Opera3ons
Equipment
Purchases












7,190,000


35

Indianapolis

IN

CDBG










10,000,000


50

Indianapolis

IN

CDBG

The
Canal’s
Ohio
Street
and
Vermont
Street
Basins
and
other
infrastructure
have
deteriorated
and
need
 replacement
or
significant
repair
in
order
to
maximize
this
world‐class
asset. Top
30
Residen3als












7,889,000


50

Indianapolis

IN

CDBG










30,000,000


150

Indianapolis

IN

CDBG

Aber
30
years,
Monument
Circle
and
Market
Street
improvements,
including
brick
streets,
sidewalks,
street
 trees,
electrical
conduit,
irriga3on,
pedestrian
ligh3ng,
banner
poles
and
benches
have
seriously
declined.

 Cultural
trail
bike
paths
and
pedestrian
ways.










50,500,000


150

Indianapolis

IN

CDBG

Top
30
Thoroughfares










28,475,000


150

Indianapolis

IN

Energy












2,000,000


10

Indianapolis

IN

Energy












4,000,000


20

Indianapolis

IN

Public
Safety

Green
Building
Seed
Money:
In
order
to
increase
the
number
of
buildings
with
green
elements
and
LEED
 cer3fied
buildings,
incen3ves
are
needed
to
encourage
the
increased
investment
of
developers
when
building
 green/LEED
buildings.

An
increase
in
the
num Energy
audits
and
retrofits
on
all
City
owned
buildings;
Alterna3ve
energy
and
materials
in
city
processes;
 Energy
efficient
ligh3ng
for
streetlights
and
traffic
lights;
Energy
efficient
vehicles
for
City
Fleets AFIS
‐
automated
fingerprint
informa3on
system
‐
replacement












1,252,808


1

Indianapolis

IN

Public
Safety

Shot
Spofers














250,000


1

Indianapolis

IN

Public
Safety

Street
Cameras















600,000


3

Indianapolis

IN

Transit














250,000


1

Indianapolis

IN

Transit














600,000


2

Indianapolis

IN

Transit












1,000,000


3

Indianapolis

IN

Transit

Implement
Wellness
Plan
Ini3a3ves
‐
Design/reconfigure
facility
to
create
an
inhouse
employee
workout
 facility,
obtain
workout
equipment,
cardiac
defibrillator,etc. Replace
ten
supervisor
vehicles
with
domes3c
hybrid
sedans
and
obtain
2
Segways
for
downtown
road
 supervisors
use. Obtain
miscellaneous
shop
equipment
‐
including
automated
3re
pressure
reading
equipment,
nitrogen
 generator,
brake
lathes,
bus
refridgera3on
maintenance
equipment,
computer
diagnos3c
equipment,
wheel
 allignment
equipment,
3re
changing
equipment,
floo Rehab
bus
facility
flooring
and
plumbing,
drains,
etc.












2,000,000


6

Indianapolis

IN

Transit












2,500,000


8

Indianapolis

IN

Transit












2,500,000


8

Indianapolis

IN

Transit












2,500,000


8

Indianapolis

IN

Transit












3,000,000


10

Indianapolis

IN

Transit












6,000,000


20

Indianapolis

IN

Water

Replace
computer
hardware/sobware
‐
obtain/install
new
digital
telephone
system,
convert
to
new
blade
 server
system,
replace
uninterupted
power
supplies
all
devices,
install
dedicated
electric
generator
with
 automated
transfer
swith,
replace
desktop
comp Design
and
replace

HVAC
system
at
administra3on
and
maintenance
facility
at
1501
West
Washington
Street
 pursuant
to
the
facility
maintenance
plan. Sep3c
Tank
Elimina3on
Projects
for
sewer
improvements
and
elimina3on
of
sanitary
sewers.

Indianapolis

IN

Water

Indianapolis

IN

Kokomo

IN

Kokomo

IN

CDBG

Rehab
bus
facility
grounds
‐
Expand
front
parking
lot,
resurface,
reseal
or
replace
exis3ng
parking
lots,
redo
 landscaping
with
low
maintenance
plan3ngs,
replace
perimeter
fencing
and
ligh3ng
and
curbs
and
sidewalks. Rehab
bus
facility
ligh3ng
‐
replace
with
more
energy
efficient
ligh3ng
and
control
systems,
redo
maintenance
 and
bus
cleaning
areas
with
more
work
conducive
ligh3ng. Replace
and
reconfigure
bus
libs
and
bus
exhaust
system
pursuant
to
the
facility
maintenance
plan.










20,767,061


90

Federal
consent
decree
projects
for
sewer
improvements.










24,424,556


120

Water

Sanitary
sewer
master
plan
projects
and
rehabilita3on
of
system.










33,624,466


160

CDBG

Sidewalks
on
Apperson
Way
from
Bon‐Air
School
to
Smith
Road.
This
project
would
construct
an
8
foot
wide
 sidewalk
to
allow
school
aged
children
to
safely
get
to
Bon‐Air
elementary
and
middle
school. Sidewalk
Reconstruc3on
on
Elm
Street
from
Washington
Street
to
Lindsay
Street.
This
project
would
 reconstruc3on
very
poor
sidewalks
in
a
neighborhood
with
several
pedestrian
friendly
des3na3ons,
including
 churches,
schools,
and
convenience
stores.
















50,000


2














300,000


4

City

State

Program

Kokomo

IN

CDBG

Project
Descrip3on

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Kokomo

IN

CDBG

Reconstruc3on
of
Park
Avenue
from
McCann
Street
to
Washington
Street,
including
new
curb,
sidewalk
and
 pavement,
to
improve
pedestrian
access
to
the
city's
public
aqua3c
center,
improve
drainange
and
water
 quality
and
revitalize
the
neighobhood. Sewage
extension
to
Darrough
Chappel
subdivision,
a
densely‐populated,
unsewered
area

Kokomo

IN

CDBG

Kokomo

IN

Kokomo

Sidewalk
Reconstruc3on
on
Taylor
Street
from
Delphos
Street
to
Calumet
Street.
This
project
would
replace
 4,000
feet
of
sidewalks
on
a
major
route
for
students
that
walk
to
school. Reconstruc3on
of
Waugh
Street
from
North
Street
to
Lordeman
Street.
This
project
would
reconstruct
this
 1,300
foot
por3on
of
Waugh
Street
and
provide
new
curb
and
gufer,
sidewalk,
and
significant
drainage
 improvements. Sidewalk
Reconstruc3on
on
Broadway
from
Washington
Street
to
Philips
Street.
This
project
would
 reconstruc3on
very
poor
sidewalks
in
a
neighborhood
with
several
pedestrian
friendly
des3na3ons,
including
 churches,
schools,
and
convenience
stores. Reconstruc3on
of
Gerhart
Street
from
Apperson
Way
to
Locke
Street.
This
project
would
lower
Gerhart
Street
 and
add
new
storm
drainage,
curb
and
sidewalks
near
Bon‐Air
Elementary
and
Middle
School. Reconstruc3on
of
Jay
Street
from
North
Street
to
Lordeman
Street.
This
project
would
add
new
storm
sewer,
 curb,
sidewalk,
and
asphalt
pavement
to
Jay
Street.

This
project
would
improve
the
pedestrian
accessibility
to
 the
neighborhood,
as
well
as
improve Owner
Occupied
Rehab
Grants

Funding
Required

Jobs














300,000


4














360,000


5














400,000


5














450,000


6














500,000


7














300,000


10












1,000,000


12














900,000


12

Water
lines
to
Darrough
Chappel
subdivision,
a
densely‐populated
area














900,000


12

Energy

K‐Fuel
project
to
recycle
cooking
into
into
a
biodiesel
fuel
used
to
power
the
city's
diesel
fleet.
















50,000


80

IN

Housing

Upgrade
all
internal
plumbing
at
Terrace
Tower.














150,000


5

Kokomo

IN

Housing

Upgrade
emergency
generators
at
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower).














200,000


5

Kokomo

IN

Housing














150,000


8.5

Kokomo

IN

Housing














150,000


10

Kokomo

IN

Housing

Upda3ng
and
replacement
of
trash
compactor
systems
at
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
 Tower). Elevator
upgrades
for
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower)
entailing
2
elevators
at
each
 building. Roof
Top
HVAC
system
at
Terrace
Tower

Kokomo

IN

Housing

Kokomo

IN

Kokomo

IN

Kokomo
















50,000


12

Sidewalk,
roadway
and
pa3o
replacement
for
all
developments
and
40
Scafered
Site
houses.














500,000


12.5

Housing

Roof
replacement
for
16
Scafered
Site
houses
(24
have
already
been
completed).
















80,000


22.5

Housing

Boiler
Replacement
at
Garden
Square
Family
Development.

This
entails
3
steam
pressure
Boilers.














375,000


25

IN

Housing














350,000


25

Kokomo

IN

Housing














500,000


30

Kokomo

IN

Public
Safety

Conversion
of
Gas
ranges
to
Electric
ranges
at
Garden
Square
Apartments
for
167
of
175
units
(8
are
 completed). Security
System
for
2
elderly
high
rises
(Civic
Center
Tower
and
Terrace
Tower),
this
includes
exterior
door
 security
for
the
buildings
and
visual
access
for
each
tenant
from
their
individual
unit. Public
Safety
Storage
Facility












3,000,000


25

Kokomo

IN

Schools

Peqt
Park
Elementary












1,500,000


20

Kokomo

IN

Schools

Elwood
Haynes
Elementary












2,500,000


30

Kokomo

IN

Schools

Memorial
Gym












2,500,000


30

Kokomo

IN

Schools

Sycamore
Elementary












2,500,000


30

Kokomo

IN

Schools

Darrough
Chapel
Early
Childhood
Center












3,000,000


40

Kokomo

IN

Schools

Moderniza3on
of
Maple
Cres
Middle












3,000,000


40

Kokomo

IN

Schools

Washington
Alterna3ve
School












3,000,000


40

Kokomo

IN

Schools

Bon
Air
Elementary












4,000,000


50

Kokomo

IN

Schools

Lafayefe
Park
Elementary












4,000,000


50

Kokomo

IN

Schools

Boulevard
Elementary










12,000,000


150

Kokomo

IN

Schools

Kokomo
High
School










20,000,000


260

Kokomo

IN

Schools










35,000,000


526

Kokomo

IN

Transit

Moderniza3on
of
Central
Middle
School.
This
historic
facility,
located
in
the
heart
of
downtown
Kokomo,
has
 been
chosen
as
the
new
site
of
Kokomo‐Center
School
Corpora3on's
administra3on
offices,
as
well
as
an
 expanded
middle
school.
HOwever,
there
are Implementa3on
of
a
a
small
scale
fixed
route
transit
system.












1,555,000


9

Kokomo

IN

Water














500,000


7

Kokomo

IN

Water












1,050,000


14

Kokomo

IN

Water














400,000


25

Kokomo

IN

Water












3,000,000


40

Kokomo

IN

Water












4,000,000


52

Kokomo,
IN

IN

Public
Safety

Ohio
Street
Storm
Sewer
Project.
This
project
would
separate
a
large
amount
of
sewers
on
the
near
east
side
of
 the
city,
reducing
combined
sewer
overflows
and
improving
drainage
in
a
very
urban
area. Storm
Sewer
Construc3on
on
Brandon,
King
and
Harrison
Streets
from
Brandon
Street
to
Buckeye
Street.
This
 project
would
include
a
new
storm
sewer
system
on
Brandon
Street,
Courtland
Avenue,
King
Street,
and
 Harrison
Street
for
the
purpose
of
separa3ng
t West
Sycamore
Street
Sewer
Extension
Project.
This
project
will
serve
a
developing
commercial
area
with
 sanitary
sewer
service.

Approximately
20
jobs
are
depending
on
this
project
to
be
completed
in
2009. Boulevard
Sanitary
Sewer
Extension
Project.
This
project
would
extend
sanitary
sewer
service
to
an
area
with
 tremendous
economic
development
poten3al
due
to
the
construc3on
of
the
new
US31
freeway
in
Kokomo.

 Boulevard
Street
is
a
major
connector
to
the Carter
Street
Sanitary
Sewer
Extension
Project.
This
project
would
extend
sanitary
sewer
service
to
an
area
 with
tremendous
economic
development
poten3al
due
to
the
construc3on
of
the
new
US31
freeway
in
 Kokomo.

US35
will
be
undergoing
a
complete
recon Construc3on
of
new
3
Bay
Fire
Sta3on
#2

Kokomo,
IN

IN

Public
Safety

Construc3on
of
new
3
Bay
Fire
Sta3on
#7












1,500,000


Kokomo,
IN

IN

Streets/Roads

Boulevard
Upgrade
(Goyer
Road
to
new
US31)












5,100,000


Kokomo,
IN

IN

Streets/Roads

Dixon
Road
Upgrade
(St.
Rd
22
to
Judson
Road)












8,500,000


Kokomo,
IN

IN

Streets/Roads

Washington
&
LaFountain
Upgrade












1,150,984


Kokomo,
IN

IN

Water

40
MGD
CSO
Wet
Weather
Treatment
Facility












8,200,000


Kokomo,
IN

IN

Water

Highland
Park
Constructed
Wetlands
for
CSO
Treatment













1,450,000


Kokomo,
IN

IN

Water

Markland
Quarry
Rain
Garden

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Sta3on
#2
fire
sta3on
new
bay
3
drive
through
sta3on
with
sleep
quarters,
offices,
lounge,
washrooms,
and
 training
room Upgrade
and
replace
exis3ng
guardrail
systems
for
safety
requirements.












1,500,000















500,000
 










2,500,000


8














250,000


8

City

State

Program

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

25th
Avenue
Area
Drainage Installa3on
of
Storm
Sewers. 25th
Avenue
Area
Sidewalk
Restora3on Installa3on
and
replacement
of
sidewalks
including
ADA
accessibility. 25th
Avenue
Area
Street
Reconstruc3on
 Installa3on
of
Curbs,
Gufers,
Paving. All
other
parks:
Fences
installed,
shelters
installed,
fitness
equipment
and
signage

Project
Descrip3on

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Lake
Sta3on

IN

CDBG

Riverview
Park‐Recrea3onal
ameni3es
to
include;
tennis
courts,
basketball
courts,
shelters,
band
shell,
and
ice
 rink.

Infrastructure
improvements
to
include;
roads,
parking
lots,
pole
barn,
shelter,
building
repairs
and
park
 tables
and
receptacles. New
Government
Complex
‐
Fire
Sta3on w/
Gold
LEED
Cer3fica3on New
Government
Complex
‐
Police
Sta3on
w/
Gold
LEED
Cer3fica3on

Lake
Sta3on

IN

Energy

Installa3on
of
energy
efficient
LED
street
ligh3ng
system
in
Riverwalk
neighborhood.

Lake
Sta3on

IN

Energy

Lake
Sta3on

IN

Energy

Lake
Sta3on

IN

Energy

Installa3on
of
energy
efficient

street
ligh3ng
system
using
LED
technology
in
the
downtown
Central
Avenue
 district. Installa3on
of
energy
efficient
area
ligh3ng
system
using
LED
technology
for
the
new
Government
Complex
 (Gold
LEED
Cer3fica3on). Treatment
of
Storm
Water
at
New
Government
Complex
(Gold
LEED
Cer3fica3on)

Lake
Sta3on

IN

Energy

Lake
Sta3on

IN

Lake
Sta3on

Funding
Required

Jobs














404,500


10














465,000


12












1,435,000


22














143,000


22

Fire
department
fixed
training
facility
for
training
of
its
firefighters.












1,780,000


28

Storm
water
flood
control
preven3on
plan
along
Deep
River
on
the
west
end
of
the
City
of
Lake
Sta3on
from
 Liverpool
Road
to
180/94. Mul3purpose/Baseball
Complex‐baseball,
soccer,
track,
trails,
building,
roads,
parking
lots
and
infrasturcture.












2,920,000


44












1,400,000


62














996,000


147












1,900,000


196












2,050,000


196














149,500


6












1,985,000


28














200,000


30














330,000


30

New
Municipal
Building
‐Geothermal
HVAC
(Gold
LEED
Cer3ficated)














500,000


45

Energy

Wind
Turbines
for
New
Government
Complex
(Gold
LEED
Cer3fica3on)














450,000


45

IN

Energy

4600
recycle
bins,
1
recycle
rearload
truck,
and
route
sobware
for
recycling
program














385,000


67

Lake
Sta3on

IN

Public
Safety

(2)
School
Resource
officers
for
2
high
schools
within
our
city














200,000


2

Lake
Sta3on

IN

Public
Safety
















89,000


2

Lake
Sta3on

IN

Public
Safety

Hire
and
train
two
new
Environmental
Resource
Officers
to
enforce
new
environmental
water
wastewater
and
 storm
drainage
ordinances.
Also
to
provide
in
school
training
for
students,
residents,
contractors
and
 developers.
NPDES
and
NPDESII
compliance. Lake
Sta3on
Fire
Mobile
command
vehicle
for
hazmat
&
WMD
response.

Mul3
purpose
command
vehicle
















95,000


3

Lake
Sta3on

IN

Public
Safety

(1)
Incident
command
vehicle
with
cad
dispatch,
video
surv.

and
comm.
network














425,000


4

Lake
Sta3on

IN

Public
Safety














376,000


4

Lake
Sta3on

IN

Public
Safety

Drug/Gang
task
force
unit
assigned
to
inves3gate
organiza3ons
and
individuals
involved
in
gangs
and
the
 distribu3on/u3liza3on
of
illegal
narco3cs. Gps
sta3on
with
laser
measuring
instrument
for
crime
and
accident
scene
analysis
















20,000


4

Lake
Sta3on

IN

Public
Safety

Replacement
of
28
yr
old
fire
truck.
Purchase
of
90
foot
aerial
ladder
truck












1,200,000


4

Lake
Sta3on

IN

Public
Safety

(10)
automated
license
plate
system
to
check
for
stolen/wanted
vehicle
on
major
highways
and
city
streets














150,000


5

Lake
Sta3on

IN

Public
Safety

(2)
addi3onal
K‐9
units
for
Police
Sta3on














150,000


5

Lake
Sta3on

IN

Public
Safety

ambulance
sta3on
sobware
for
report
wri3ng

















5,000


5

Lake
Sta3on

IN

Public
Safety














125,000


5

Lake
Sta3on

IN

Public
Safety

New/Replacement
of
undercover
and
surveillance
equipment
to
assist
officers
with
the
detec3on
and
 prosecu3on
of
defendants Purchase
of
25
tasers
for
officers
















22,500


5

Lake
Sta3on

IN

Public
Safety

Purchase
two
emergency
warning
siren
systems
for
inciement
weather
&
special
alerts














320,000


5

Lake
Sta3on

IN

Public
Safety

EMS
Portable
to
communicate
with
police
and
fire
dept.

















8,880


6

Lake
Sta3on

IN

Public
Safety














150,000


6

Lake
Sta3on

IN

Public
Safety

the
purchase
of
an
automated
fingerprint
iden3fica3on
system
that
will
allow
techs
to
direct
query
both
the
 indiana
and
FBI
fingerprint
database
for
suspects
fingerprints
that
are
leb
on
scene. New
Roof
to
replace
roof
leeks
and
broken
3les
inside
ambulance
sta3on
















25,000


8

Lake
Sta3on

IN

Public
Safety














100,000


10

Lake
Sta3on

IN

Public
Safety














150,000


10

Lake
Sta3on

IN

Public
Safety














112,000


10

Lake
Sta3on

IN

Public
Safety














665,000


10

Lake
Sta3on

IN

Public
Safety

Police
5‐lane
indoor
firing
range
with
noise
afenua3on
that
would
be
available
to
other
local
law
enforcement
 agencies. Sobware
enhancements
for
dispatch,
emergency
911,
reports,
and
gps














232,770


10

Lake
Sta3on

IN

Public
Safety

Training
Room/Av
upgrade/
supplies
room
need
upgrades
ambulance
















20,000


10

Lake
Sta3on

IN

Public
Safety

Ani‐Alli
system
For
Cad
for
ambulance
dispatch.
















50,000


15

Lake
Sta3on

IN

Public
Safety

Protec3ve
equipment
protec3ve
gear
hazmat














180,000


15

Lake
Sta3on

IN

Public
Safety

October
fire
preven3on
program.
1600
school
children
visi3ng
7
schools
to
conduct
fire
preven3on
and
drills
















47,120


18

Lake
Sta3on

IN

Public
Safety

New
ambulance
to
replace
1993
ambulance
which
is
con3nuosly
breaking
down














160,000


20

Lake
Sta3on

IN

Public
Safety

Op3coms
for
safety
to
protect
EMS
and
Civilians
















40,000


20

Lake
Sta3on

IN

Public
Safety

Video
Backup
system
for
ambulance
sta3on
















20,000


20

Lake
Sta3on

IN

Public
Safety














440,639


25

Lake
Sta3on

IN

Streets/Roads












3,233,000


52

Lake
Sta3on

IN

Streets/Roads

Mul3
hazard
preven3on
program.

Fire
preven3on
to
educate
young
children
and
senior
adults
fire
preven3on
 and
safety Liverpool
Road
Pavement
resurfacing
of
irregular
pavement,
install
curb
and
gufers,
sidewalks,
crosswalks
and
 ADA
access
as
required.
Installa3on
of
new
street
drainage
systems. 2009
Resurface
Program














825,000


55

Lake
Sta3on

IN

Streets/Roads

New
ADA
Compliant
Curb
Ramps
at
80
Intersec3ons












2,025,000


55

Lake
Sta3on

IN

Streets/Roads












6,400,000


150

Lake
Sta3on

IN

Water

Central
Avenue
Transporta3on
Enhancement
Project
Phase
I Reconstruc3on
of
irregular
pavement,
install
curb
and
gufers,
sidewalks,
crosswalks
and
ADA
access.

 Installa3on
of
new
street
drainage
system. Installa3on
and
monitoring
of
sanitary
sewer
system
at
6
key
flow
loca3ons.














156,000


5

Lake
Sta3on

IN

Water

Upgrade
of
lib
sta3on
#5
electrical
and
metering
due
to
age
and
outdated
equipment.














260,000


7

(20)
Dash
mounted
in‐car
video
systems
to
be
u3lized
for
the
documenta3on
of
evidence
as
well
as
record
the
 communica3on
between
officers
and
ci3zens. 30
Portable
defibrillator
that
would
be
placed
in
every
police
car
and
at
the
police
sta3on.

The
defibrillators
 could
save
someone's
life
who
would
be
suffering
from
Sudden
Cardiac
Arrest. Physio
life
Pak
12
Cardiac
Monitors

City

State

Program

Lake
Sta3on

IN

Water

Lake
Sta3on

IN

Lake
Sta3on

Project
Descrip3on

Funding
Required

Jobs














335,000


Water

Municipal
Storm
Sewer
and
Drainage
Systems
Improvements Area
wide
storm
sewer
outlet
repairs
and
open
channel
restora3on. Repair
and
replace
flow
structure
Manhole
on
Interceptor
at
Montgomery
and
Fairview.
















44,000


8

IN

Water

Installa3on
of
emergency
bypass
pumping
systems
at
18
lib
sta3on
sites.














360,000


10

Lake
Sta3on

IN

Water

Remove
and
replace
the
electrical
control
systems
at
12
lib
sta3on
sites
due
to
aging
and
obsolete
equipment.














960,000


10

Lake
Sta3on

IN

Water

Replacement
of
lib
sta3on
#7
due
to
age
and
overflow
issues.














440,000


10

Lake
Sta3on

IN

Water














635,000


12

Lake
Sta3on

IN

Water

Fire
Hydrant,
Water
Main
Isola3on
Valve
Replacement
Program
and
Well
improvements.
 Replace
broken
and
non‐working
fire
hydrants.
Replace
broken
and
inoperable
isola3on
valves.

Rehabilitate
 exis3ng
potable
water
wells. Replacement
of
lib
sta3on
#2
due
to
age
and
outdated
equipment.














535,000


12

Lake
Sta3on

IN

Water














460,000


12

Lake
Sta3on

IN

Water














320,000


15

Lake
Sta3on

IN

Water

Water
Well
and
Filter
Improvements Installa3on
of
two
new
water
wells
with
filters
and
pressure
booster
systems. Internal
inspec3on
team
and
camera
truck
to
monitor
the
city's
sanitary
and
storm
sewers.
Exis3ng
system
is
 very
old
and
requires
frequent
repairs
and
maintenance Repair
and
repaint
water
tower,
upgrade
and
install
new
control
system,
al3tude
valve
and
alarm.














935,000


19

Lake
Sta3on

IN

Water

Replace
aging
and
deteriorated
Sanitary
Interceptor
Sewer.














795,000


22

Lake
Sta3on

IN

Water

Installa3on
of
Central
Avenue
and
Grand
Blvd.
Relief
drainage
system.












1,075,000


24

Lake
Sta3on

IN

Water

Backup
power
for
four
(4)
wells.














200,000


30

Lake
Sta3on

IN

Water

Replacement
of
three
(3)
exis3ng
lib
sta3ons
and
metering
equipment
due
to
age
and
outdated
equipment.














750,000


30

Lake
Sta3on

IN

Water

Remove
and
replace
aging
and
obsolete
water
meters.












1,400,000


48

Lake
Sta3on

IN

Water

Repairs
to
Exis3ng
Pump
Houses

Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence

IN IN IN IN IN IN IN IN IN IN IN IN

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Mardyke‐Edlou
Streets
Drainage
 Indian
Lake
Blvd.
West
‐
Drainage
Project Old
Orchard
Drainage
Project Thunderbird
Road
Drainage
 Allen‐Sellars‐Hull
Streets
Drainage
 Jenn
Park
Building
Rennova3on Paradise
Drainage
Project Skate
park
restroom
and
ammeni3es Richart
‐
Hartman
Avenues
Drainage 46th
‐
50th
Streets
and
Richart
Avenue
‐
Hartman
Avenue
 Richart
Street
Curb
and
Sidewalk Richart
Street
Curb,
Sidewalk,
Drainage














240,000
 














50,000
 














95,000
 














50,000
 












150,000
 












190,000
 












150,000
 














75,000
 














80,000
 












670,000
 












200,000
 












200,000


60 4 8 8 10 12 12 12 14 15 18 18

Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Lawrence Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville Merrillville

IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN

CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG Energy Energy Energy Energy Energy Energy Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Sellers
Area
Development Renovate
Community
Center
on
Franklin
Street Sidewalks/Curb
Replacement/Repair 52nd
Street
Re‐alignment Franklin
Road/Hess
Road
Resurface
Project Renovate
Sterref
Center Resurface
Sunnyside
Street Street
Resurfacing
(General) 59th
Street
‐
Street
Department
 Energy
Retrofit
of
the
City
Government
Center Energy
Efficient
Windows
in
Government
Buildings Installa3on
of
LED
Street
Ligh3ng
at
Government
Complex Installa3on
of
LED
Street
Ligh3ng
in
Lawrence
Proper Solar
Panels
on
City
Government
Buildings
+
Energy
Retrofits LED
Ligh3ng

at
Community
Center,
Jenn,
Alexander
and
Skate
parks Clinton
Street
Lib
Sta3on
rehab Oaklandon
Road
Tower
rehabilita3on Edlou
Lib
Sta3on
Rehab 52nd
Street
Tower
rehabilita3on Richardt
Street
Tower
rehabilita3on 47th
Street
Water
Main
Project
(abandon
old
4") Hartman
Drive
water
main
replacement
(46th
to
47th) Sadlier
Street
water
main
replacement
(46th
to
47th) Hermosa
Drive
Lib
Sta3on
reloca3on Maple
Lane
water
main
replacement Indian
Lake
Road
water
plant
upgrades Brookhaven
water
main
replacement
(neighborhood
wide) Harrison
Park
water
main
replacement
(neighborhood
wide) Richardt
Street
water
treatment
plant
upgrades Fort
Harrison
Water
Plant
rehabilita3on Sanitary
Sewer
Main
Rehabilita3on
(system
wide) New
stop
Signs LED
Lights
in
Exis3ng
Traffic
Signals Chase
St.
drainage
Improvements 73rd
Ave.
Drainage
Improvements Historic
District
streetscape
Improvements Marshall
St.
Drainage
Improvements
from
US
30
to
73rd
St. 61st
St.
Widening
Project 80th
Place
&
Braodway
Intersec3on
Improvements Tab
&
Rutledge
Drainage
Improvements,
Phase
2 Harms
Road
Resurfacing Marcella
Road
Improvements Colorado
St.
Resurfacing














200,000
 












325,000
 












195,000
 












240,000
 












475,000
 












280,000
 












300,000
 












350,000
 










1,250,000
 










1,300,000
 














75,000
 












100,000
 












350,000
 












950,000
 












525,000
 












350,000
 












100,000
 












150,000
 












150,000
 












350,000
 












400,000
 












150,000
 














75,000
 














75,000
 












300,000
 












100,000
 












400,000
 










1,500,000
 












750,000
 










2,000,000
 










3,500,000
 










2,500,000
 















2,500
 














10,000
 














25,000
 














75,000
 












100,000
 












125,000
 












150,000
 












150,000
 












150,000
 












300,000
 












300,000
 












350,000


18 18 20 20 38 38 38 42 60 120 6 16 20 30 38 40 10 10 12 14 14 15 18 18 20 20 30 32 32 35 60 100 0.01 0.3 0.8 2.5 3.3 4.2 5 5 5 10 10 12

8

City

State

Program

Merrillville Merrillville Michigan
City Michigan
City

IN IN IN IN

Water Water CDBG CDBG

Tab
Street
Interceptor
Sanitary
Sewer Rehablita3on
of
Sanitary
Sewers
in Elston
Grove
‐
rebuild
streets,curbs,gufers,sidewalks
and
replace
sanitary
sewers Eastport
Area
Improvements
‐
streets/walks/curbs

Project
Descrip3on

Michigan
City

IN

CDBG

West
Side
Improvements
‐
streets,walks,curbs

Michigan
City

IN

CDBG

Michigan
City

IN

Streets/Roads

Michigan
City

IN

Streets/Roads

Lafayefe‐Barker
Phase
D,E,F
&
I
‐separate
combined
sewers
by
installing
new
storm
sewers;
rebuild
 streets,curbs,gufers
and
sidewalks West
Beach
Access:
project
to
provide
access
to
Lake
Michigan
from
the
west
side
of
Michigan
City
&
 par3cularly
a
residen3al
neighborhood Michigan
Boulevard
Project:
milling,
paving,
drainage,
curb
replacement
&
sidewalks

Michigan
City

IN

Streets/Roads

Michigan
City

IN

Michigan
City

Funding
Required Jobs 










1,200,000
 25 










1,500,000
 30 








11,100,000
 40 










3,000,000


45












3,500,000


45










12,300,000


50












1,000,000


12












3,000,000


45

Coolspring
Avenue:
reconstruc3on
&
widening
of
a
heavily
traveled
east/west
route












2,000,000


48

Streets/Roads

Ohio
Street:
Reconstruc3on
of
a
major
north/south
route












6,000,000


48

IN

Water

Henry
Street
Lib
Sta3on:
relocate
and
rebuild
sanitary
sewer
lib
sta3on












1,000,000


10

Michigan
City

IN

Water

Kimball
Woods
Lib
Sta3on:
rebuild,
add
grinder
pumps
and
standby
generator














200,000


10

Michigan
City

IN

Water

Lake
Avenue
Lib
Sta3on:
rebuild
sanitary
sewer
lib
sta3on














300,000


10

Michigan
City

IN

Water

Electrical
switchgear
at
M.C.
Water
Plant
‐
replace
electrical
switchgear












2,000,000


12

Michigan
City

IN

Water

New
Eastwood
Storage
Tank












2,000,000


12

Michigan
City

IN

Water

Clark
Lib
Sta3on
‐replacement
of
lib
sta3on














350,000


20

Michigan
City

IN

Water

E
Street
Siphon
replacement














750,000


20

Michigan
City

IN

Water










18,600,000


20

Michigan
City

IN

Water












1,000,000


20

Michigan
City

IN

Water

Lafayefe‐Barker
Storm
Sewer
Interceptor:
provide
storm
sewer
interceptor
backbone
for
large
area
urban
 combined
sewer
separa3on
&
rebuild
Lafayefe
Street Southgate
Wastewater
Improvements:
rebuild
sanitary
sewer
lib
sta3on
&
redirect
flow
to
new
sanitary
sewer
 trunk
line. Greenwood
Ave
Storm
Sewer
replacement:
replace
storm
sewer












1,000,000


45

Mishawaka

IN

CDBG

Lynn
Street
Improvements
(Borley
‐
Mckinley)
Construc3on
of
Curbs,
Sidewalks,
Storm
Sewer
and
Pavement














975,000


23

Mishawaka

IN

Public
Safety

Twenty
(20)
ML
900
Mobile
Laptops
for
assigment
to
police
department
field
officers.














100,000


0

Mishawaka

IN

Public
Safety

School
Resource
Officers
in
Middle
and
High
School
plus
associated
equipment














175,000


2

Mishawaka

IN

Streets/Roads

Main
Street
Improvement
Project
Phase
I
(Mishawaka
Avenue
‐
Bafell)

Added
Travel
Lanes












1,775,250


39

Mishawaka

IN

Streets/Roads

Main
Street
Improvement
Project
Phase
IV
(Donaldson
‐
McKinley)
Added
Travel
Lanes












3,380,000


70

Mishawaka

IN

Water

Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"B",
Div
III
(Frank
Park
‐
Park
Place)
700
lf
of
24"
FM

Mishawaka Mishawaka

IN IN

Water Water

Judy
Creek
Forcemian
Replacement
Project
(Clay
‐
Lowell)
1200
lf
18"
FM Northwest
Trunk
Gravity
Sewer
CIPP
Lining
Project
(Marion
St.
‐
Wilson
Blvd.)
3000
lf
36"
lining














365,400
 












367,650


10 10














875,500


21

Mishawaka

IN

Water














975,000


23

Mishawaka

IN

Water

Twelbh
Street
Sanitary
Sewer
Reloca3on
Project
(Ninth
‐
Twelbh)
1500
lf
27"
gravity
sewer
reloca3on
due
to
 SR
331
Constr. Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"C"
(Park
Place
‐
Catalpa
Drive)
1240
lf
of
24"
FM














625,600


24

Mishawaka

IN

Water

Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"E"
(McKinley
‐
Jefferson)
2380
lf
of
24"
FM












1,115,700


25

Mishawaka

IN

Water

Holy
Cross
Parkway
Pump
Sta3on
Building
and
Site
Improvements












1,250,500


30

Mishawaka

IN

Water

Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"F"
(Jefferson
‐
Mishawaka
Ave.)
2550
lf
of
24"
FM












1,275,300


30

Mishawaka

IN

Water












1,950,250


42

Mishawaka

IN

Water

Milburn
Area
Sewer
Improvement
Project
Division
"B"
(Southwest
I)
LTCP
Element
‐
sewer
separa3on
and
 sewer
lining New
River
Crossing
&
580
lf
of
Gravity
Sewer
(Mishawaka
Ave.
‐
Front
Street)












1,952,500


42

Mishawaka

IN

Water












2,912,485


60

Mishawaka

IN

Water

Milburn
Area
Sewer
Improvement
Project
Division
"D"
(Southwest
II)
LTCP
Element
‐
sewer
separa3on
and
 sewer
lining Holy
Cross
Parkway
Pump
Sta3on
Forcemain
‐
Phase
II
"D"
(Catalpa
Drive
‐
McKinley)
6350
lf
of
24"
FM












3,057,400


64

Mishawaka

IN

Water












3,356,844


70

Mishawaka

IN

Water












3,477,050


72

Mishawaka

IN

Water












4,224,394


87

Mishawaka

IN

Water












4,522,970


93

Muncie

IN

Airport

Milburn
Area
Sewer
Improvement
Project
Division
"E"
(Dale
Avenue)
LTCP
Element
‐
sewer
separa3on
and
 sewer
lining Milburn
Area
Sewer
Improvement
Project
Division
"G"
(River
Avenue)
LTCP
Element
‐
sewer
separa3on
and
 sewer
lining Milburn
Area
Sewer
Improvement
Project
Division
"F"
(Eastern
Phase)
LTCP
Element
‐
sewer
separa3on
and
 sewer
lining Milburn
Area
Sewer
Improvement
Project
Division
"H"
(Central)
LTCP
Element
‐
sewer
separa3on
and
sewer
 lining Corporate
Hangar

Muncie

IN

Airport

Relocate
Apron,
11000
sy












1,500,000


Muncie

IN

Airport

Runway
14‐32
Overlay












8,900,000


Muncie

IN

Airport

Self‐fueling
system














100,000


Muncie

IN

Airport

Standby
Engine
Generator,
250KW














100,000


Muncie

IN

Airport

Taxiway
B
Lights

Muncie

IN

CDBG

Addi3on
of
public
park
in
north
side
of
city

Muncie

IN

CDBG

Heekin
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing














250,000


Muncie

IN

CDBG

Thomas
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing.














150,000


6

Muncie

IN

CDBG

McCullough
Park
revitaliza3on
including
replacing
mowed
areas
with
grasses
that
do
not
require
mowing.














350,000


12

Muncie

IN

CDBG

Reconstruc3on
of
Tuhey
Pool‐public
parks
pool












2,000,000


15

Muncie

IN

CDBG

Road
paving
and
sidewalks
for
low
to
moderate
income
level
neighborhoods










15,000,000


35

Muncie

IN

Energy

Energy
Retrofit
for
all
city
government
buildings












4,000,000


Muncie

IN

Energy

Retrofit
380
municipal
roadway
lights
with
high‐eficiency
LED
fixtures

Muncie

IN

Energy

Retrofit
all
traffic
signals
with
high‐efficiency
LED
fixtures

Muncie

IN

Housing

Gillespie
Towers
(Senior
Apartment
High‐Rise) Exterior
Window
Replacement
(Energy
Efficiency) HVAC
Upgrade
to
achieve
energy
efficiency.

 Replace
exisi3ng
boilers
and
related
mechanical
equipment. Main
Lobby
Renova3on
and
new
ves3bule












3,000,000















400,000
 










3,000,000
 6














250,000
 















1,000















850,000


7

City

State

Program

Muncie

IN

Housing

Muncie

IN

Housing

Muncie

IN

Public
Safety

Parkview
Apartments Demoli3on New
insfrastructure
for
tax
credit
project Community
building
and
site
ameni3es Earthstone
Terrace
&
Southern
Pines
Housing Site
infrastructure
and
public
improvements Emergency
health
and
safety
systems New
energy
efficient

doors
and
window
systems New
energy
efficient
HVAC
systems ADA
accessibility
modifica3ons
and
improveme 10
SWAT
vests
and
30
ballis3c
shields

Project
Descrip3on

Funding
Required

Jobs

Muncie

IN

Public
Safety

100'‐110'
plazorm
aerial
truck
to
replace
1970
re3red
verson

Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie Muncie

IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN IN

Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Public
Safety Streets/Roads Streets/Roads Streets/Roads

127'
ladder
truck
to
replace
1983
version 15
in
car
radios
and
30
officer
radios
for
interoperability 75'‐85'
Sutphen
Quint
to
replace
1986
version Computers,
sobware
and
servers
for
inhouse
and
vehicles Five
police
cars,
two
inves3ga3ve
cars
and
three
evidence
vans NEC
latent
fingerprint
sta3on
(AFIS) Ocean
Sytem
video
Processing
Sta3on Remodeling
of
Fire
Sta3on
#4 Repair
of
Fire
Sta3on
#1 Repair
of
Fire
Sta3on
#3 Repair
of
Fire
Sta3on
#5 Repair
of
Fire
Sta3on
#7 Replacement
of
Fire
Sta3on
#3 Replacement
of
Fire
Sta3on
1 Underground
parking
garage
for
City
Hall
$19,000
per
parking
spacing Video
camera
equipment,
printersand
imagers
for
cars WEB
page
development Ten
officers Alternate:

McGalliard
Road
from
Wheeling
to
Broadway
(1.6
miles)‐Mill/Replace
damaged
curbs
where
 Alternate:

Tillotson
Avenue
from
Riverside
to
McGalliard
(1.3)‐Mill
where
necessary/Raise
Structures/3
inch
 Bridge
No.
122
(550S
over
Bell
Creek)

Muncie

IN

Streets/Roads

Bridge
No.
205
(100W
over
No
Name
Creek)
















75,000


Muncie

IN

Streets/Roads

Bridge
No.
59
(450W
over
Kilbuck
Creek)
















75,000


Muncie

IN

Streets/Roads

Bridge
No.
69
(600W
over
Kilbuck
Creek)














425,000


Muncie

IN

Streets/Roads

Bridge
No.
701
(Water
Street
in
Albany
over
Halfway
Creek)














325,000


Muncie

IN

Streets/Roads

Muncie

IN

Streets/Roads

Fuson
Rd.
(Old
SR
67)
from
SR‐67
Interchange
to
Cowan
Road‐Mill
where
necessary/3
inch
resurface/shoulder
 improvements Reconstruc3on
of
5‐lane
McGalliard
Rd.












8,000,000


10

Muncie

IN

Streets/Roads

Reconstruc3on
of
5‐lane
Tillotson
Ave.












4,000,000


10

Muncie

IN

Streets/Roads










25,000,000


60

Muncie

IN

Transit

Repaving
and
sidewalk
repair
for
streets
and
sidewalks
not
in
low
to
moderate
income
neighborhoods
making
 ADA
compliant Purchase
four
replacement
hybrid
electric
transit
buses

Muncie

IN

Transit

Purchase
four
replacement
paratransit
(MITSPlus)
vans

Muncie

IN

Water

18th
and
Macedonia
storm
sewers
and
roads












4,000,000


Muncie

IN

Water

8th
St.
and
Howell
St.












1,000,000


Muncie

IN

Water

Elgin
St..
and
McGalliard
Rd.

Muncie

IN

Water

Perdieu
and
Ewing
storm
sewer












1,000,000


Muncie

IN

Water

Purdue
and
Ewing












1,000,000


Muncie

IN

Water

Robinwood
Addi3on‐Peqgrew
Acres

Muncie

IN

Water

Upper
Luick
Ditch












1,200,000


Plymouth

IN

CDBG

Installa3on
of
fiber‐op3c
network
serving
the
Plymouth
and
Marshall
County
Indiana
area.












3,500,000


120

Richmond

IN

Airport

Runway
Overlay,
fencing,
terminal
improvements,
new
hangars












2,000,000


20

Richmond

IN

CDBG

Principal
Riverwalk










18,000,000


25

Richmond

IN

Energy

Richmond
Municipal
Building
Energy
Efficiency
Project












1,000,000


7.5

Richmond

IN

Public
Safety

Fiber
op3c
cable
installa3on












1,000,000


20

Richmond

IN

Streets/Roads

Salisbury
Road
North












1,000,000


10

Richmond

IN

Streets/Roads

South
E
Street
Project












2,000,000


20

Richmond

IN

Water

CSO
projects
as
part
of
the
long
term
control
plan












5,000,000


20

St.
John

IN

CDBG

Columbia
Avenue
storm
sewer
project:

Add
addi3onal
capacity














275,000


15

St.
John

IN

CDBG

Town
wide
Road
resurfacing
with
drainage
improvements,
including
areas
recently
annexed
into
the
Town












1,600,000


55

St.
John

IN

Water














800,000


27

St.
John

IN

Water












1,300,000


43

Terre
Haute

IN

Airport
















20,000


0

Terre
Haute

IN

Airport

Terre
Haute

IN

Airport

Joliet
street
Storm
sewer
rehabilita3on
project
to
minimize
flooding
through
an
older
sec3on
of
town.
Work
 includes
upgrading
exis3ng
8"
Water
main
to
12" Town's
Main
Lib
Sta3on
is
being
upgraded
due
to
capacity
being
reached.

A
new
building
will
be
constructed
 along
with
new
pumps
and
controls. ARFF
Firefigh3ng
Equipment
‐
to
replace
incomplete
sets
that
are
ten
or
more
years
old.
This
would
be
five
 complete
sets. ARFF
Fire
Truck
‐
currently,
the
only
two
trucks
covering
this
Interna3onal
Airport
are
1975
and
1976
models.

 Air
Na3onal
Guard
flying
mission
removed
due
to
BRAC.

ARFF
coverage
also
removed. New
Warehouse
/
Sort
Facility
for
Increased
FTZ
Opera3ons


Terre
Haute

IN

Airport

Terre
Haute

IN

Public
Safety












1,450,000


12












3,800,000


24
















72,000
 












850,000
 












800,000
 












144,000
 












600,000
 












240,000
 












265,000
 














53,000
 














14,000
 












100,000
 












260,000
 















2,000
 














22,000
 














20,000
 












600,000
 










1,500,000
 










1,000,000
 












115,000
 















5,000
 












750,000
 












800,000
 












600,000


10














550,000















600,000













2,100,000
 












315,000

















75,000

















75,000















600,000


6












1,200,000


30

Terminal
Expansion
‐
necessary
area
for
expanded
passenger
service
and
TSA
requirements.












3,700,000


35

Radio
Equipment
‐
Fire
Department
‐
will
enable
THFD
to
communicate
with
all
other
agencies
as
THFD
is
NOT
 on
the
State
system












1,000,000


City

State

Program

Terre
Haute

IN

Public
Safety

Terre
Haute

IN

Public
Safety

Terre
Haute

IN

Public
Safety

Terre
Haute

IN

Terre
Haute

Project
Descrip3on

Funding
Required

Jobs

Radio
Equipment
‐
Police
Department
‐
will
enable
THPD
to
communicate
with
all
other
agencies
as
THPD
is
 NOT
on
the
State
system Fire
Department
EMS
Rescue
Truck
‐
Shared
asset
for
DHS
response
with
Task
Force
7
and
Vigo
County
EMA












1,600,000
 












300,000


4












3,200,000


30

Streets/Roads

Public
Safety
Center
‐
Police,
Fire
and
EMA.

New
building
that
also
serves
Indiana
DHS
and
Task
Force
7.

 Currently,
all
three
facili3es
are
spread
out,
have
structural,
mold
and
u3lity
issues. Single
axle
and
tandem
dump
trucks
for
maintaining
State
Road
63
that
was
recently
given
to
the
City.














225,000


3

IN

Streets/Roads

Brown
Avenue
‐
Wabash
Ave.
to
Locust
St.












1,500,000


15

Terre
Haute

IN

Streets/Roads












2,000,000


15

Terre
Haute

IN

Streets/Roads












3,500,000


15

Terre
Haute

IN

Streets/Roads

Hunt
Rd.
Phase
I
‐
technology
/
industrial
park
adjacent
to
Terre
Haute
Interna3onal
Airport.
Road
 improvements,
fiber
op3cs
and
u3lity
upgrades
needed
for
logis3cs,
trucking
and
aerospace
use.

Possible
 ISU/Rose
Hulman
incubator
area. Hunt
Rd.
Phase
II
‐
technology
/
industrial
park
adjacent
to
Terre
Haute
Interna3onal
Airport.
Road
 improvements,
fiber
op3cs
and
u3lity
upgrades
needed
for
logis3cs,
trucking
and
aerospace
use.

Possible
 ISU/Rose
Hulman
incubator
area. Brown
Avenue
‐
Locust
St.
to
Maple
Ave.












4,000,000


20

Terre
Haute

IN

Streets/Roads

Lafayefe
Avenue
‐
4th
St.
to
Haythorne.












5,500,000


20

Terre
Haute

IN

Streets/Roads












6,000,000


20

Terre
Haute

IN

Streets/Roads












5,500,000


25

Terre
Haute

IN

Streets/Roads










35,000,000


50

Terre
Haute

IN

Transit

Margaret
Avenue
‐
From
SR46
to
East
of
Fruitridge
Ave.

Upgrades
to
traffic
flow
to/from
new
Eastside
 commercial,
retail
and
airport
areas. Removal/Reloca3on
of
Railroad
Line
‐
Graham
Grain
Line
‐
will
increase
flow
of
traffic
and
reduce
costs
of
new
 street
construc3on
including
US‐41. Reloca3on
of
Railroad
yard
‐
Margaret
Ave
Crossing
improvements
and
Baker
Yard
reloca3on
to
Ft.
Harrison
 Yard.

Will
ELIMINATE
East‐West
traffic
conges3on
and
expand
yard
capacity.

Part
of
Terre
Haute
Joint
Rail
Plan
 with
CSX
and
IN
Railroad. ADA
Hydraulic
Libs
for
three
City
Buses
‐
Increases
route
service
















60,000


0

Terre
Haute

IN

Transit

Hybrid
Public
Bus

Terre
Haute

IN

Water

Terre
Haute

IN

Water

Whi3ng

IN

Whi3ng














180,000


2

Wastewater
Treatment
Plant
‐
Phase
II
Digester
Replacement












1,100,000


25












1,200,000


35

CDBG

Deerfield
Project
‐
Upon
comple3on
of
the
first
part
of
the
US‐641
bypass,
addi3onal
lib
sta3ons,
extensions
 and
sewer
connectors
for
residen3al
and
commercial
development. Public
Building
asbestos
abatement
project














250,000


8

IN

CDBG

Museum
and
Art
Center












1,250,000


19

Whi3ng

IN

CDBG

Public
Works
Facility
reloca3on












1,750,000


22

Whi3ng

IN

Energy












1,875,000


18

Whi3ng

IN

Public
Safety

Indiana
Energy
Savings
Contract
project
to
retrofit
municipal
buildings
with
new
energy
technology.

Also
 includes
LED
traffic
and
street
light
conversion. Police
Department
PC
and
dispatch
technology
upgrade
















25,000


0

Whi3ng

IN

Public
Safety

EMA
unit
startup
costs

Whi3ng Whi3ng Whi3ng Whi3ng Whi3ng Whi3ng Whi3ng Whi3ng Whi3ng Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City

IN IN IN IN IN IN IN IN IN KS KS KS KS KS KS KS KS KS KS KS KS KS KS KS

Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG CDBG

Center
Street
access
reconstruc3on Sidewalk
installa3on
capital
plan Cleveland
Avenue
street
reconstruc3on
including
water
and
sewer
replacement Standard
Diamonds
water
line
installa3on Hammond
water
line
service
connec3on Schrage
Avenue
16"
water
main
installa3on
and
road
reconstruc3on 121st
Street
sewer
collapse
repair
and
road
reconstruc3on White
Oak
Avenue
sewer
and
water
lines
improvements
and
road
reconstruc3on Wastewater
Deten3on
Facility
efficiency
upgrades 726
Minnesota
Ave

Roof
Replacment 726
Minnesota
Ave
Building
Mold
Abatement Court
Services
Emergency
Generator Courthouse
South
stair
renova3ons Elec3on
Office
(850
State)
Parking
Lot
Repair Memorial
Hall

Exterior
Pain3ng Health
Department
Exterior
Restora3on Health
Department
Roof
Replacment 14th
&
Washington
Storm
Drainage Court
Services
Restroom
&
Entry
ADA
Renova3ons Memorial
Hall
Elevator
installa3on
4
units Courthouse

Fire
Alarm
System
Replacement Parking
Lot
B

6th
&
State
Ave

Redesign
and
Renova3on
of
deteriora3ng
parking
structure Wyandofe
County
Lake
waterline Health
Department
First
Floor
Renova3ons
















75,000
 












300,000
 












525,000
 










2,600,000
 












150,000
 












850,000
 












650,000
 












750,000
 










2,000,000
 










3,300,000
 












150,000
 












100,000
 












250,000
 












250,000
 












100,000
 












100,000
 












400,000
 












300,000
 












400,000
 












750,000
 










1,000,000
 










2,500,000
 










2,000,000
 












800,000


2 10 12 35 6 15 15 18 24 35 2 2 2 2 2 2 3 3 5 6 6 8 8 9

Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City

KS KS KS KS KS KS KS

CDBG CDBG CDBG CDBG Energy Energy Energy

Parking
Facili3es

A,C,E Memorial
Hall
Building
Renova3ons Western
Fire
Sta3on

New
Fire
Sta3on
in
Western
area
of
city Parking
Facili3es
$20M
Public
Parking
Facility Environmental
Advisor:

Fund
the
hiring
of
a
consultant
or
permanent
employee
to
assist
in
environmental
 Annex
(8200
State
Ave)
New
Cooling
Tower City
Hall/MOB
Roof
Replacement












1,500,000
 










3,000,000
 










2,000,000
 










4,500,000
 








20,000,000
 














60,000
 












200,000


10 10 15 18 80 1 2

Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City

KS KS KS KS KS KS KS KS KS KS

Energy Energy Energy Energy Energy Energy Energy Energy Energy Energy

Courthouse
Fan
Coil
Replacement
Final
Phase City
Hall/MOB

Electrical
Service
Distribu3on
Tower Jus3ce
Complex
Roof

Building
Repair Jus3ce
Complex
Roof
Replacment Courthouse

Annual
Elevator
Projects Memorial
Hall

HVAC
Building
Upgrade Court
Services

New
Exterior
Window
Wall
System Fire
Sta3on
Facili3es

Rehab
of
exis3ng
buildings
that
are
in
various
states
of
disrepair Memorial
Hall

HVAC
Building
Upgrade East
Building

Chiller
Repair/Cooling
Tower














250,000
 












150,000
 












603,592
 












900,000
 












900,000
 










2,500,000
 










3,000,000
 










2,000,000
 










3,500,000
 










2,000,000


2 2 5 6 6 8 8 10 12 12












1,065,000


14

Kansas
City

KS

Energy

energy
efficient
window
replacement
in
5
major
goverment
owned
buildings












2,000,000


22

City

State

Program

Kansas
City

KS

Energy

City
Hall

Window
Replacement
with
energy
improvemnet
design

Project
Descrip3on

Funding
Required 










5,000,000


Jobs 30

Kansas
City

KS

Energy

Kansas
City

KS

Energy

Courthouse
Renovate
&
Redesign
4th
and
5th
floors
space
with
energy
improvemnets
and
green
design










15,000,000


55










22,000,000


100

Public
Safety

City
Hall

Plaza
energy
improvement,
addi3on
of
green
design
feature,
municipal
court
and
structure
 rehabilita3on
 Elec3on
Office
(850
State
Ave)
Security
System

Kansas
City

KS
















50,000


Kansas
City

2

KS

Public
Safety

Indian
Springs
Building
Demoli3on
Outbuildings/3
structures














150,000


2

Kansas
City

KS

Public
Safety

Public
Levee

Barge
Dock
Stabiliza3on














300,000


2

Kansas
City

KS

Public
Safety

Public
Levee

Decommission
Cold
Storage
Building














500,000


4

Kansas
City

KS

Public
Safety

Court
Services
HVAC
Upgrade












1,000,000


5

Kansas
City

KS

Public
Safety

New
Emergency
Management
Facility

Building












3,000,000


12

Kansas
City

KS

Public
Safety












6,000,000


20

Kansas
City

KS

Public
Safety

New
Jail
Deten3on
facility

Currently
the
jail
popula3on
exceeds
capac3y
of
the
jail
facility.

This
results
in
 extensive
$
on
farm
outs.
(Office
Space
for
Juvenile
Courts,
D.A.,
&
staff) City
Hall/MOB

Ground
Floor
Renova3on












5,000,000


40

Kansas
City

KS

Public
Safety










18,000,000


60

Kansas
City

KS

Public
Safety










10,000,000


70

Kansas
City

KS

Public
Safety










25,000,000


200

Kansas
City

KS

Streets/Roads

New
Jail
Deten3on
facility

Currently
the
jail
popula3on
exceeds
capacity
of
the
jail
facility.

This
results
in
 extensive
$
on
farm
outs. Abandoned
property
&
blighted
property
demoli3on

Currently
the
abandoned
property
demands
exceed
the
 financial
resources.

Current
needs
are
about
$2.5
M.

Funding
is
over
a
1
or
2
year
period. Levee

7
Levee
Support $5M
Fairfax $20M
Kaw
Valley Pierson
Park
Resurfacing

Roadway
Repair














200,000


3

Kansas
City

KS

Streets/Roads

142nd
St
Bridge

Bridge
Replacement














200,000


4

Kansas
City

KS

Streets/Roads

East
Kansas
Ave
Bridges

Structural
Repairs














250,000


4

Kansas
City

KS

Streets/Roads

Shawnee
Ave
Bridge

Bridge
Re‐deck














350,000


4

Kansas
City

KS

Streets/Roads

Bridge
No.
85

Box
Culvert
Replacement














350,000


5

Kansas
City

KS

Streets/Roads

7th
Street
‐
Washington
Ave
to
Quindaro
Blvd

Curbs,
Sidewalk
Street
Rehab,
Lights












1,200,000


10

Kansas
City

KS

Streets/Roads

38th
St/Park
Dr
Pavement
Replacement














900,000


12

Kansas
City

KS

Streets/Roads

Minnesota
Ave

Reconstruc3on
and
redesign
of
6th
St
to
8th
St












2,000,000


16

Kansas
City

KS

Streets/Roads

County
Line
Rd

47th
St
to
55th
St












1,600,000


20

Kansas
City

KS

Streets/Roads












3,500,000


25

Kansas
City

KS

Streets/Roads

State
Ave
‐
48th
to
69th Curbs,
Sidewalk
Street
Rehab,
Lights Parallel
Avenue

5th
St
to
9th
St












4,500,000


30

Kansas
City

KS

Transit

Bus
Rapid
Transit












1,000,000


6

Kansas
City

KS

Transit

Bus
Replacement
ITS

Replace
buses
and
provide
I.T.
Technology












2,000,000


10

Kansas
City

KS

Water

Jersey
Creek
Phases
4,5,6

Channel
Lining
Repair














500,000


4

Kansas
City

KS

Water

Trechless
Sewer
Repair

Repair
of
exis3ng
infrastructure














500,000


4

Kansas
City

KS

Water

Argen3n
Grit
Removal
Facility

System
to
protect
combined
sewer
siphon
under
the
Kaw
River














800,000


5

Kansas
City

KS

Water

Pump
Sta3on
61
and
66

Pump
Sta3on
Rehab/Replace














350,000


5

Kansas
City

KS

Water

River
Crossing
Gate
Repair














500,000


6

Kansas
City

KS

Water














800,000


8

Kansas
City

KS

Water

Middle
Jersey
Creek
CSO
Removal I/I
Source
removal,
manhole
rehab,
pipeline
rehab Pump
Sta3on
41
Force
Main

Force
Main
Replacement












1,000,000


8

Kansas
City

KS

Water

Western
Jersey
CSO
Remocal
Program

Reapir
and
Separa3on
of
Sewer












3,000,000


12

Kansas
City

KS

Water

AID
&
FID
Force
Main

Lining/Paralleling
Pipe












3,000,000


25

Kansas
City

KS

Water

CID
Storm
Sewers


CSO
Elimina3on












3,000,000


25

Kansas
City

KS

Water

Parallel
Avenue
Storm
Sewers

Extend
street
project
storm
sewers












5,000,000


33

Kansas
City

KS

Water












5,000,000


33

Kansas
City

KS

Water

Potable
drinking
water
replacement
Replacing
water
mains.

There
is
in
over
200
miles
to
be
replaced
with
a
 replacement
cost
of
over
$80M.

Funding
required
and
Number
of
Jobs
created
are
yearly. 18th
St.
Storm
Sewer

CSO
Elimina3on












6,000,000


35

Kansas
City

KS

Water










15,000,000


58

Kansas
City

KS

Water

Green
Job Sewer
System
expansion

Extend
sewer
systems
to
areas
currently
using
sep3c
systems 18th
St
Pump
sta3on

Stormwater
Pump
Sta3on










10,000,000


60

Lenexa

KS

Streets/Roads

PRAIRIE
STAR
PARKWAY
AND
PRAIRIE
CREEK
ROAD.

Traffic
Signal.














325,000


18

Lenexa

KS

Streets/Roads

K‐10
TRAIL.

10
foot
wide,
mul3‐use
trail
along
K‐10.














415,000


20

Lenexa

KS

Streets/Roads

95th
AND
RIDGE.

Traffic
signal
and
mul3‐use
path.














700,000


30

Lenexa

KS

Streets/Roads

K‐10
AND
WOODLAND.

Streetligh3ng,
Traffic
signal
and
ramp
widening.














700,000


30

Lenexa

KS

Streets/Roads

SLURRY
SEAL.
















750,000


30

Lenexa

KS

Streets/Roads

MILL
OVERLAY.












2,300,000


80

Lenexa

KS

Streets/Roads

ROAD
RECONSTRUCTION
‐
COLLEGE
BLVD
‐
RENNER
TO
RIDGEVIEW.












9,085,000


360

Lenexa

KS

Streets/Roads

87th
STREET
‐
RENNER
TO
LENNOX.

Street
reconstruc3on.










17,000,000


680

Lenexa

KS

Streets/Roads










47,500,000


1880

Lenexa

KS

Water












1,200,000


40

Lenexa

KS

Water












4,500,000


160

Lenexa

KS

Water

LONE
ELM
INTERCHANGE.

Construc3on
of
a
standard
diamond
interchange
with
roundabouts.

Widening
of
 approximately
4,600
feet
of
Lone
Elm
Road
to
a
four‐lane
arterial
street.

Realighnment
of
the
frontage
road.

 Con3nuous
auxilary
lanes
between
the
new
K PRAIRIE
STAR
WETLAND
EXPANSION. Expansion
of
an
exis3ng
constructed
wetland
facility.

The
wetlands
will
be
designed
to
mi3gate
the
 stormwater
generated
froma
proposed
commmercial
site
on
the
adjacent
property. CITY
CENTER
CENTRAL
GREEN.

Construc3on
of
a
restored
streamway
and
wetland
complex
through
a
 proposed
mixed
use
development.
Stormwater
quality
and
quan3ty
mi3ga3on
will
be
accomplished
in
an
 exis3ng
impacted
stream
corridor
that
exist
on
the
proper LITTLE
MILL
CREEK
STREAMS/LACKMAN
TRIBUTARY.

This
tributary
has
been
highly
impacted
due
to
suburban
 development.
Construc3on
will
include
a
variety
of
natural
stabiliza3on
techniques.












5,000,000


200

City

State

Program

Lenexa

KS

Water

Lenexa

KS

Water

Manhafan

KS

Airport

LAKE
OF
THE
PRAIRIE.

Construc3on
of
a
reservoir
and
Park
facility
to
prevent
flooding
of
12
homes
in
an
 established
neighborhood
of
western
Lenexa.

Will
include
wetland
plan3ngs
for
water
quality.

Park
facili3es
 will
incorporate
green
infrastructure CORRUGATED
METAL
PIPE
REPLACEMENT.
Over
80
miles
of
pipe
that
needs
to
be
replaced.
The
total
cost
of
 replacement
is
es3mated
to
be
about
$87
Million.
Of
this
amount
approximately
half
is
determined
to
be
in
 need
of
immediate
replacement. Perimeter
Security
Fence
at
Manhafan
Regional
Airport
(MHK)

Project
Descrip3on

Funding
Required

Jobs












1,001,500


8

Manhafan

KS

Airport

Commercial
Aircrab
Hanger
and
Parking
Apron
at
Manhafan
Regional
Airport
(MHK)












3,250,000


62

Manhafan

KS

CDBG

Kansas
State
University
Child
Development
Center












1,000,000


0

Manhafan

KS

CDBG

Expansion
Facility
for
Manhafan
Day
Care
and
Learning
Centers,
Inc.












3,200,000


26

Manhafan

KS

CDBG

Construct
Two
New
Fire
Sta3ons












4,000,000


136

Manhafan

KS

Public
Safety

Implement
Regional
GIS














450,000


5

Manhafan

KS

Streets/Roads

Traffic
Signal
Coordina3on
‐
Fort
Riley
Boulevard
















71,250


1

Manhafan

KS

Streets/Roads

Traffic
Signal
Coordina3on
‐
Kimball
Avenue
















93,750


1

Manhafan

KS

Streets/Roads

Traffic
Signal
Coordina3on
‐
Seth
Child
Road
















93,750


1

Manhafan

KS

Streets/Roads

Traffic
Signal
Coordina3on
‐
Tufle
Creek
Boulevard
















93,750


1

Manhafan

KS

Streets/Roads

Traffic
Signal
Coordina3on
‐
West
Anderson
Avenue
















93,750


1

Manhafan

KS

Streets/Roads

K‐18
and
Miller
Parkway/Davis
Drive
Signaliza3on
and
Installa3on
of
Turn
Lanes














716,000


8

Manhafan

KS

Streets/Roads

East
Poyntz
Avenue
(US‐24)/Tufle
Creek
Boulevard/Fort
Riley
Boulevard














144,500


10

Manhafan

KS

Streets/Roads














400,000


11

Manhafan

KS

Streets/Roads

Tufle
Creek
Boulevard
(US‐24)
&
Walters
Drive/Tufle
Creek
Boulevard
&
Northfield
Road
Intersec3on
 Improvements Scenic
Drive
and
Miller
Parkway
Intersec3on














967,000


12

Manhafan

KS

Streets/Roads

4th
Street
‐
K‐18
to
Pierre
Street












2,026,529


19

Manhafan

KS

Streets/Roads

4th
Street
and
Bluemont
Avenue
Roundabout












2,219,000


19

Manhafan

KS

Streets/Roads

McCall
Road
Improvements












8,100,000


19

Manhafan

KS

Streets/Roads

Tufle
Creek
Boulevard
(US‐24)
and
Marlaf
Avenue












1,536,000


19

Manhafan

KS

Streets/Roads

West
Anderson
Avenue/Kimball
Avenue
Road
and
Intersec3on
Improvements














924,800


20

Manhafan

KS

Water

Konza
Sanitary
Sewer
Extension












1,000,000


8

Manhafan

KS

Water

Konza
Waterline
Extension












1,149,275


8

Manhafan

KS

Water

Downtown
Redevelopment
Sewer
Lines














822,058


10

Manhafan

KS

Water

Downtown
Redevelopment
Water
Lines














214,320


10

Manhafan

KS

Water

Downtown
Redevelopment
Storm
Sewers












1,599,484


12

Manhafan

KS

Water

Tecumsah
and
Quivera
System












6,250,000


12

Manhafan

KS

Water

Blue
Township
Sanitary
Sewer
Connec3on












1,300,000


39

Manhafan

KS

Water

Water
Plant
Expansion/Upgrade
and
New
Raw
Waterline










16,000,000


90

Manhafan

KS

Water

Wastewater
Plant
Expansion/Upgrade










30,000,000


106

Newton

KS

Airport

Acquire
Land
For
Runway
17
Protec3on














650,000


3

Newton

KS

Airport

Fuel
Storage
Security
Fence














126,000


5

Newton

KS

Airport

Slurry
Seal
Runway
8‐26














195,000


10

Newton

KS

Airport

Airfield
Guidance
Signage














790,000


15

Newton

KS

Airport

Slurry
Seal
Runway
17‐35














510,000


15

Newton

KS

Airport

Update
Runway
17
ILS
System












1,000,000


15

Newton

KS

Airport

Add
Runway
35
ILS
System












2,000,000


20

Newton

KS

Airport

Aircrab
Runup
Safety
Areas












1,055,000


20

Newton

KS

Airport

Rehab/Widen
Taxiway












3,000,000


20

Newton

KS

Airport

South
Development
Taxiway
and
Apron












2,200,000


20

Newton

KS

CDBG

Reconstruct
SE
4th
St.:
Kansas
to
Walnut














300,000


15

Newton

KS

Streets/Roads

SW
24th
Street
Bridge
Substructure
Pain3ng














110,000


5

Newton

KS

Streets/Roads

W.
12th
Street:
Boyd
to
Meridian














390,000


10

Newton

KS

Streets/Roads

Ash
Street
Bridge
over
Sand
Creek












1,400,000


15

Newton

KS

Streets/Roads

Spencer:

Broadway
to
12th
St.












1,260,000


15

Newton

KS

Streets/Roads

US‐50
Highway
and
Anderson
Road
Interchange










32,500,000


35

Newton

KS

Water

Waterline
rehabilita3on
in
Athle3c
Park














150,000


7

Newton

KS

Water

8"
Pipe
Burs3ng
under
I‐135
to
Caperland














350,000


10

Newton

KS

Water

Water
Tower
Pain3ng
&
Repair
Projects
Citywide












1,400,000


20

Newton

KS

Water

1st
Street
Water
Pump
Sta3on
Rehabilita3on












2,000,000


25

Newton

KS

Water

Wastewater
Treatment
Plant
Improvements,
Ph.
2,
Nutrient
removal










12,000,000


30

Bowling
Green

KY

Airport

Commercial
Air
Service
Revenue
Guarantee














500,000


15

Bowling
Green

KY

Airport

Commercial/Industrial
Lover's
Lane
Development












1,100,000


30

Bowling
Green

KY

Airport

New
Fixed
Based
Operator














875,000


31

Bowling
Green

KY

Airport

Overlay
and
Strengthen
Runway
3‐21












2,000,000


40

Bowling
Green

KY

CDBG

Double
Springs
East
Sidewalk
and
Drainage














210,000


1

Bowling
Green

KY

CDBG

Park
Improvements














282,000


2

Bowling
Green

KY

CDBG

Greenway
Path
construc3on
at
Kereiakes
Park;
Old
Louisville
Rd.,
West
Campus,
South
Campus
and
Lovers
Lane












1,045,000


5

Bowling
Green

KY

CDBG

N.
Limestone
Sidewalks/Bikelanes














500,000


20

Bowling
Green

KY

Energy

City
Buillding
Energy
Retrofit














500,000


2

Bowling
Green

KY

Energy

Install
Substa3on
security
cameras














100,000


2

Bowling
Green

KY

Energy

Upgrade
street
ligh3ng
along
Kentucky
St.
from
31W
Bypass
to
8th
St














211,000


3

Bowling
Green

KY

Energy

Upgrade
Street
Ligh3ng
along
Veterans
Memorial
Blvd.
Phases
3&4














200,000


3










14,000,000


560










30,000,000


1200

City

State

Program

Bowling
Green

KY

Energy

Install
animal
preven3on
measures
at
Bowling
Green
Primary
substa3on

Project
Descrip3on

Funding
Required 














90,000


Jobs

Bowling
Green

KY

Energy

Bowling
Green
Primary
Substa3on
Relay
Upgrade














500,000


Bowling
Green

KY

Energy

Fence
&
gravel
South
Industrial
poleyard
















80,000


5

Bowling
Green

KY

Energy

Re‐conductor
Circuit
CM
224
&
Circuit
5HI
214












1,200,000


10

Bowling
Green

KY

Energy

Bowling
Green,
KY
to
Franklin,
KY
Fiber
connec3on














384,000


14

Bowling
Green

KY

Energy

Bowling
Green,
KY
to
Morgantown,
KY
Fiber
connec3on














600,000


14

Bowling
Green

KY

Energy

Energy
S3mulus
Efficiency
Grants












3,000,000


18

Bowling
Green

KY

Energy

Data
center/Network
opera3ons
center
at
WKU
Center
for
Research
&
Development
(WKU
center
for
R&D)












5,130,311


50

Bowling
Green

KY

Housing

Capitol
Improvements
and
Deferred
Maintenance
for
598
Public
Housing
Units












5,000,000


5

Bowling
Green

KY

Housing

Fort
Webb
Subdivision
Infrastructure












4,000,000


5

Bowling
Green

KY

Housing

Purchase
and
Renovate
Mul3‐family
Apartment
Complex












5,000,000


6

Bowling
Green

KY

Housing

Lee
Square
Subdivision












1,100,000


10

Bowling
Green

KY

Housing

Renova3ng
Distressed
Residen3al
Proper3es














600,000


200

Bowling
Green

KY

Public
Safety

New
detec3ve
vehicles
and
undercover
vehicles














200,000


1

Bowling
Green

KY

Public
Safety

Dedicated
Federal
Prosecutor
and
Support














250,000


2

Bowling
Green

KY

Public
Safety

New/replacement
Surveillance
Equipment














300,000


2

Bowling
Green

KY

Public
Safety

Two
New
Canine
Units














250,000


2

Bowling
Green

KY

Public
Safety

Police
Annex/Storage
Facility
construc3on












3,400,000


30

Bowling
Green

KY

Schools

Monitoring
System
District
Wide














100,000


4

Bowling
Green

KY

Schools

Asbestos
Abatement














250,000


24

Bowling
Green

KY

Schools

Improving/enhancing
Safety














200,000


24

Bowling
Green

KY

Schools

HVAC
Work












1,000,000


36

Bowling
Green

KY

Streets/Roads

Street
Resurfacing














800,000


4

Bowling
Green

KY

Streets/Roads

Greenwood
Lane












1,600,000


10

Bowling
Green

KY

Streets/Roads

Old
Morgantown
Rd.
reconstruc3on












4,000,000


29

Bowling
Green

KY

Streets/Roads

Cave
Mill/Smallhouse
Road
Re‐alignment












4,000,000


30

Bowling
Green

KY

Streets/Roads

Shive
Lane
Extension












5,000,000


36

Bowling
Green

KY

Streets/Roads

Southwest
Parkway
construc3on
from
Nashville
Rd.
to
Russellville
Rd.










20,000,000


144

Bowling
Green

KY

Transit

Bus
Transfer
Sta3on












1,000,000


13

Bowling
Green

KY

Water

Security
System
Upgrade














500,000


6

Bowling
Green

KY

Water

Install
check
valves
to
tank














225,000


7

Bowling
Green

KY

Water

Filter
Backwash
replacement














650,000


8

Bowling
Green

KY

Water

Jennings
Creek
Interceptor
Rehabilita3on














300,000


9

Bowling
Green

KY

Water

CCTV
Assessment,
Sewer
Basins














500,000


10

Bowling
Green

KY

Water

Telemetry
to
Sewer
Sta3ons

Bowling
Green

KY

Water

Eliminate
Dead
End
Mains

Bowling
Green

KY

Water

Interceptor
Cleaning
and
Video

Bowling
Green

KY

Water

Bowling
Green

KY

Bowling
Green

4 5














500,000


11












1,000,000


12














500,000


13

Replace
Cast
Iron
Mains












1,000,000


15

Water

Briarwood
Sewer
Rehabilita3on












1,000,000


26

KY

Water

Relief
Sewer
to
Pioneer
Drive












3,200,000


32

Bowling
Green

KY

Water

2
MG
South
Central
Tank












2,200,000


38

Frankfort

KY

Water










19,600,000


157

Frankfort

KY

Water










10,000,000


250

Hopkinsville

KY

CDBG














200,000


0

Hopkinsville

KY

CDBG














150,000


15

Hopkinsville

KY

CDBG










15,000,000


20

Hopkinsville

KY

CDBG












1,000,000


200

Hopkinsville

KY

Energy












3,900,000


4

Hopkinsville

KY

Energy












7,800,000


6

Hopkinsville

KY

Housing














550,000


30

Hopkinsville

KY

Public
Safety












8,260,075


11

Hopkinsville

KY

Public
Safety

Franklin
County
Interstate
64
Regional
Water
Supply:
Construct
9
miles
of
24
inch
transmission
main
to
provide
 regional
water
supplies
to
Frankfort,
Franklin
County,
Shelby
County
and
Scof
County
in
Kentucky. The
City
of
Frankfort
Holmes
Street
Sanitary
Sewer
Separa3on
Project:

Rehabilita3on
and
Separa3on
of
 combined
sanitary
and
storm
water
in
a
low
income
area
of
the
city.

The
Project
includes
the
installa3on
of
 3995
LF
of
Storm
Sewer
(210’
or
36”,
460 The
proposed
project
is
to
construct
a
restroom
facility
in
the
Heart
of
Downtown
Hopkinsville
that
will
service
 the
many
ameni3es
that
are
currently
available.

The
proposed
facility
would
be
erected
in
close
proximity
to
 outdoor
facili3es
 Riverwalk
Connector
Walking
Bridge:

The
City
of
Hopkinsville
is
proposing
that
a
walking
bridge
be
built
 between
the
exis3ng
West
Side
Park
and
walking
trails
located
on
the
northern
bank
of
the
Lifle
River
and
 walking
trails
 The
proposed
project
includes
the
establishment
of
the
Campbell
Street
corridor
to
provide
a
more
efficient
 entrance
into
downtown
Hopkinsville.

The
proposal
is
seeking
funding
for
the
renova3on
of
Campbell
Street.
 The
City
of
Hopkinsville
is
reques3ng
a
$1,000,000
grant
over
the
period
of
two
(2)
years
to
be
u3lized
in
the
 Inner
City
Residen3al
Enterprise
Zone
(ICREZ)
neighborhoods.

The
City
will
be
partnering
with
the
Chris3an
 County‐Hopkinsville
Development
 Automated
Electric
Informa3on
System:

The
City
of
Hopkinsville
is
proposing
an
automated
electric
 informa3on
system.

Currently,
electric
customers
use
more
electricity
than
necessary
due
to
lack
of
 informa3on
about
the
amount
of
electricity
being
used Hopkinsville,
KY
Green
Power
Project:

Hopkinsville
Electric
System
will
install
a
1
megawaf
genera3on
sta3on
 on
Peartree
Lane
in
Hopkinsville.
This
sta3on
will
help
serve
the
electrical
needs
of
Chris3an
County
including
 the
Fort
Campbell
Post. Clark
Gardens
(Hopkinsville
Affordable
Homeownership
Program):
The
City
is
proposing
the
comple3on
of
 infrastructure
for
the
Clark
Gardens
Subdivision.

The
Clark
Gardens
Subdivision
was
created
on
City
owned
 property
in
2001
as
a
subdivision
 Chris3an
County,
KY
High‐speed
Infrastructure:

Hopkinsville
Electric
System
(HES)
is
prepared
to
build
a
high‐ speed
communica3ons
network
throughout
Chris3an
County.
The
proposed
network
will
use
a
combina3on
of
 fiber
op3c
transmission
lines
and
wir Communica3ons
Center
Renova3ons/EOC
backup:
The
Communica3ons
Center
Renova3ons
por3on
of
the
 proposed
project
includes
improved
communica3ons
systems,
expanded
office
space
to
accommodate
 dispatch
personnel,
increased
security
measures,
and
updates














500,000


15

City

State

Program

Hopkinsville

KY

Public
Safety

Hopkinsville

KY

Public
Safety

Hopkinsville

KY

Public
Safety

Hopkinsville

KY

Schools

Hopkinsville

KY

Schools

Hopkinsville

KY

Schools

Hopkinsville

KY

Schools

Hopkinsville

KY

Transit

Hopkinsville

KY

Transit

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Hopkinsville

KY

Water

Lexington

KY

Airport

Eagle
Cove
Leb‐Hand
Turning
Lanes:
The
City
of
Hopkinsville
is
proposing
the
construc3on
of
a
leb‐hand
 turning
lane
on
US68/80B
Eagle
Way
to
accommodate
and
provide
stacking
for
vehicular
traffic
afemp3ng
to
 access
the
Eagle
Cove
Subdivision Riverbank
Stabiliza3on:
The
Lifle
River
Stabiliza3on
Project
will
include
the
design,
construc3on
management,
 and
construc3on
of
the
necessary
walls
and
other
structures
required
to
stabilize
the
east
bank
of
the
Lifle
 River
 Pardue
Lane
Drainage
and
Passive
Park:
The
RC
Owen
property
is
located
on
the
south
side
of
Pardue
Lane.

A
 por3on
of
the
property
is
slated
to
be
u3lized
to
provide
storm
water
facili3es
to
serve
the
immediate
area.
 Lacy
Elementary
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
last
phase
of
deteriorated
roof
of
 Lacy
Elementary
School
which
is
an
exis3ng
K‐5th
grade
elementary
school. Hopkinsville
Middle
School
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
sec3on
of
roof
over
 classrooms
in
an
exis3ng
grade
6‐8
middle
school.

 Hopkinsville
High
School
Re‐roofing:
The
City
of
Hopkinsville
is
proposing
to
replace
the
deteriorated
roof
over
 gymnasium
of
an
exis3ng
grade
9‐12
high
school.

 Chris3an
County
Middle
School:
The
City
of
Hopkinsville
is
proposing
the
construc3on
of
middle
school
to
 include
grade
6
thru
8
for
800
students
to
replace
the
exis3ng
school
built
in
1959.

 Lovers
Lane
Expansion:
The
City
of
Hopkinsville
is
proposing
a
major
widening
of
the
exis3ng
Lovers
Lane
from
 2
lanes
to
3
lanes
from
US
HWY
41A
(Ft
Campbell
Blvd)
on
the
east
to
the
junc3on
of
Lovers
Lane
and
the
 Pennyrile
Parkway
Extension
 Chris3an
County
Advanced
Road
Development
Program
2009:
The
proposal
is
to
pave
the
exis3ng
93
miles
of
 gravel
roads
in
Chris3an
County.

Chris3an
County
Kentucky
is
geographically
the
second
largest
county
in
the
 State
of
Kentucky.
Fort
Campbell,
KY, US
41A
Water
Main
Improvements:
The
proposal
is
to
replace
8‐inch
water
main
along
US41A
with
12‐inch
 main,
construct
2
million
gallon
elevated
storage
tank
and
booster
sta3on,
and
construct
an
interconnect
with
 Oak
Grove Hillaire/Skyline
Drive
Stormwater
Infrastructure
Improvements:

The
proposed
project
will
involve
storm
water
 infrastructure
improvements
that
will
benefit
many
Givens
Addi3on
area
homes
that
currently
experience
 flooding
of
crawl
spaces,
yards Westwood
Drive
Stormwater
Infrastructure
Improvements:

The
proposed
project
will
involve
storm
water
 infrastructure
improvements
that
will
benefit
a
minimum
of
ten
(10)
structures
that
currently
experience
 flooding
of
structures,
yards,
and
streets.

 Hopkinsville
Water
Main
Extensions
–
US
68/80
Bypass:
The
proposal
is
to
install
water
main
along
US68/80B
 which
will
provide
water
service
to
the
currently
unserved
area. Moss
Water
Treatment
Plant
Upgrade/Expansion:
The
proposal
is
to
upgrade
the
exis3ng
treatment
and
 expand
the
capacity
from
10
to
15
million
gallons
per
day
which
will
provide
for
compliance
with
current
and
 future
regula3ons
and
adequate
capacity
throu SRF
Phase
VI:

The
proposed
project
will
involve
various
gravity
sewer
rehab
and
replacement
projects,
three
 sewer
extensions,
installa3on
of
chemical
feed
equipment
for
phosphorus
compliance
at
Northside
WWTP;
 SRF
Phase
VII:

The
proposed
project
will
involve
five
sewer
extensions
along
US68/80B
and
US41A;
include
15
 new
pump
sta3ons
and
upgrading
four
exis3ng
pump
sta3ons
which
will
provide
sewer
service
to
unserved
 areas
allowing
residen3al
and
commercial Dry
Dam:
The
proposed
project
will
include
the
design
and
construc3on
of
a
regional
flood
control
facility
 and/or
watershed
lakes
strategically
placed
to
provide
the
necessary
flood
control
for
the
South
Fork
of
Lifle
 River.
Flooding
in
the
City
of
Hopk Air
Carrier
Ramp
Rehabilita3on

Project
Descrip3on

Lexington

KY

Airport

Lexington

KY

Lexington

Funding
Required

Jobs














250,000


15














350,000


15














750,000


30














192,000


5














520,000


7














603,000


9










22,600,000


90












4,000,000


30










11,250,396


100












6,000,000


25














538,800


30












1,096,800


30












8,000,000


35










15,000,000


50












7,500,000


50










21,500,000


50










13,000,000


75












2,618,000


25

Relocate
Terminal
Drive
and
Airfield
Ligh3ng
Electrical
Vault












5,930,000


60

Airport

Construct
TW
D
Reloca3on
and
Corp.
Ramp
Addi3on
–
Phase
II












7,033,000


70

KY

Airport

Construct
RW
9‐27
Phases
II
and
III










18,000,000


150

Lexington

KY

CDBG
















75,000


5

Lexington

KY

CDBG

Downtown
plaques
in
various
parks
and
spaces
need
to
be
cleaned
in
an3cipa3on
of
2010
World
Equestrian
 Games Mark
Ave
sidewalk
comple3on
















25,000


5

Lexington

KY

CDBG

Sidewalk
Ramps,
Garden
of
Hartlands
Subdivision
















10,000


5

Lexington

KY

CDBG

South
Broadway
sidewalk
enhancements
















50,000


5

Lexington

KY

CDBG

Family
Care
Home
Network
Building;
Flooring/Pain3ng
and
HVAC
















56,000


6

Lexington

KY

CDBG














780,000


6

Lexington

KY

CDBG

Solar
Compactors
–
project
to
collect
recyclables
and
trash
in
centralized
downtown
areas
in
solar
compactors.
 The
project
will
reduce
fuel
costs,
container
costs,
traffic
issues,
reduce
air
pollu3on,
and
improve
accessibility
 on
sidewalks. Streets
&
Roads
Forestry
Sweeper/Replace
Wall
Unit
and
Heater
and
Pain3ng
















22,000


7

Lexington

KY

CDBG

Streets
&
Roads
Forestry
Salt
Building;
Roofing
















50,000


8

Lexington

KY

CDBG

Black
and
Williams
Center
Gym;
Flooring
and
Windows














250,000


10

Lexington

KY

CDBG

Charles
Young
Center
Repair/Renova3on














250,000


10

Lexington

KY

CDBG

Day
Treatment;
Flooring
and
Water
Heat
Pumps
















74,000


10

Lexington

KY

CDBG

GTV3;
Upgrade/Renovate/HVAC
Improvements
















58,000


10

Lexington

KY

CDBG

Loudon/Bryan/Castlewood
Intersec3on
Improvements
and
Streetscape
Enhancements














250,000


10

Lexington

KY

CDBG

Provide
water
service
to
dog
park
at
Wellington
Park
















70,000


10

Lexington

KY

CDBG














162,000


10

Lexington

KY

CDBG

Replace
outdated
cinder
block
dugouts
on
18
city‐program
ball
fields
with
park‐standard
chain
link.

Current
 structures
allow
illicit
and
dangerous
ac3vity
out
of
sight. Versailles
Road
sidewalk
enhancements














100,000


10

Lexington

KY

CDBG

Waste
Management;
Pain3ng/Flooring
and
HVAC
Improvements














150,000


10

Lexington

KY

CDBG

Waste
Management‐Vehicle
Wash;
Truck
Bay
Renova3ons/HVAC
Improvements














135,000


12

Lexington

KY

CDBG

Furrow
Building‐1302
Versailles
Rd.;
Office
Renova3on
















30,000


13

Lexington

KY

CDBG

Community
Ac3on‐Opera3on
Family;
Replace
Flooring/Storm
Sewers/Paint














600,000


14

Lexington

KY

CDBG

Explorium
of
Lexington;
Flooring
and
Pain3ng














700,000


14

Lexington

KY

CDBG

Opera3onal
Adjustment
Center;
Flooring
and
HVAC
















90,000


14

Lexington

KY

CDBG

Safety
City;
Pain3ng/Flooring
and
HVAC
Improvements
















30,000


14

City

State

Program

Lexington

KY

CDBG

Streets
&
Roads
Forestry
Building
#1;
Electrical
Upgrade/Pain3ng
and
HVAC
Improvements

Project
Descrip3on

Funding
Required 












110,000


Jobs 14

Lexington

KY

CDBG

Lexington

KY

CDBG

Family
Care
Center;
Flooring
and
Pain3ng














200,000


15

Arts
Place;
Window/Floor
Upgrade,
HVAC
Upgrade














340,000


Lexington

KY

16

CDBG

Furrow
Building‐1306
Versailles
Rd.;
Recycling
Center
Total
Renova3on














500,000


Lexington

16

KY

CDBG

Coopera3ve
Extension
Service;
Kitchen
Renova3on/Flooring/Wall
Paper
and
HVAC














447,000


17

Lexington

KY

CDBG

Coleman
House;
Renovate
Bathrooms/Electrical/flooring
and
HVAC














150,000


18

Lexington

KY

CDBG

Streets
&
Roads
Forestry
Building
#2;
Renova3on
and
New
Roofing














100,000


18

Lexington

KY

CDBG

Switow
Building;
Pain3ng/Flooring
and
HVAC
Improvements














170,000


18

Lexington

KY

CDBG

Carnegie
Center;
Windows/Pain3ng/Flooring
and
HVAC














910,000


19

Lexington

KY

CDBG

Morton
House;
Total
Building
Renova3on
including
HVAC
Improvements














850,000


19

Lexington

KY

CDBG

Convert
unafrac3ve
conven3onal
playground
to
Splash
Park
at
Castlewood
Park














150,000


20

Lexington

KY

CDBG














517,900


20

Lexington

KY

CDBG

Courthouse
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important
downtown
 public
parking
garage. General
Services
Building;
Renova3on/Roofing/HVAC














385,000


20

Lexington

KY

CDBG

Old
Transfer
Sta3on;
Demoli3on












1,000,000


20

Lexington

KY

CDBG

Recycling
Center;
Flooring/Pain3ng
and
HVAC
Improvements














133,000


20

Lexington

KY

CDBG

Upgrade
of
Roofing
(insula3on)
and
HVAC
systems
of
Kenwick














200,000


20

Lexington

KY

CDBG

Upgrade
of
Roofing
(insula3on)and
HVAC
systems
of
Bell
Place














200,000


20

Lexington

KY

CDBG

Water
service
to
Coldstream
park
















50,000


20

Lexington

KY

CDBG

Fleet
Services;
Flooring/Pain3ng
and
HVAC














200,000


22

Lexington

KY

CDBG














250,000


22

Lexington

KY

CDBG

Revenue
Commission
Roof
Replacement
and
Skylight
Restora3on
Replace
exis3ng
built‐up
roof
w/
a
new
roof
 and
restore
historic
skylight. Central
Kentucky
Job
Center;
Flooring/Entrance/HVAC
Renova3ons














170,000


23

Lexington

KY

CDBG

Large
capacity
picnic
shelter
with
restrooms
for
park
and
trail
associated
events
@
Coldstream














500,000


25

Lexington

KY

CDBG














700,000


25

Lexington

KY

CDBG

Lights
to
Shillito
Tennis
Complex,
to
replace
poor
ligh3ng
at
city's
premier
tennis
facility
where
safety
has
 become
an
issue.

Economic
Development
Opportunity McConnell
Springs
Interpre3ve
Overlook
at
Final
Sink
&
Small
Storage
















40,000


25

Lexington

KY

CDBG

Redevelopment
of
Northeastern
Park
in
conjunc3on
with
adjacent
Hope
Six
Housing
project














125,000


25

Lexington

KY

CDBG

Redevelopment
of
Realtor's
Plaza














130,000


25

Lexington

KY

CDBG

Renovate
historic
Carriage
House
Theater
at
Bell
House,
a
150
year
old
historic
landmark
in
Lexington














250,000


25

Lexington

KY

CDBG














150,000


25

Lexington

KY

CDBG














500,000


25

Lexington

KY

CDBG

Renovate
outdated
shelter/restroom
building
that
houses
Therapeu3c
Recrea3on
and
swim
camp
programs
 and
skateboard/concession
func3ons
with
energy
and
security
efficient
structure Replace
Lakeside
Golf
Course
irriga3on
to
incorporate
adjacent
lake
to
reduce
expense
of
buying
treated
water
 for
course Replace
windows
at
Dunbar














100,000


25

Lexington

KY

CDBG

Woodward
Heights
redevelopment
‐
Poten3al
Trail
System
Comfort
Sta3on
or
Bike
Hub














250,000


25

Lexington

KY

CDBG

Lexington Lexington

KY KY

CDBG CDBG

Bell
House
replacement
windows
on
signature
public
space
in
Lexington.

Project
will
reduce
fuel
costs,
water
 incursion
and
deteriora3on
to
150
year
old
Na3onal
Historic
Register
property Terminal
Curbside
Improvements
and
Terminal
Façade
Renova3on Phoenix
Building;
Windows/Flooring/Pain3ng
and
HVAC
Improvements














150,000
 










2,549,000


30 30












2,020,000


35

Lexington

KY

CDBG

Kentucky
Theater;
Improve
Sound
System/New
Sea3ng/New
Ligh3ng
and
HVAC












1,660,000


36

Lexington

KY

CDBG

Government
Center;
Total
Building
Renova3ons












8,000,000


40

Lexington

KY

CDBG

Senior
Ci3zens
Center;
Total
Building
Renova3ons‐Add
Courtyard
and
HVAC
Improvements












1,210,000


48

Lexington

KY

CDBG

Race
Street
Shotgun
House
Redevelopment












2,000,000


50

Lexington

KY

CDBG

Rosemont
Garden
Improvements
from
Railroad
to
Lafayefe
Parkway












1,900,000


50

Lexington

KY

CDBG












4,388,500


50

Lexington

KY

CDBG

Russell
School
Adap3ve
Reuse
for
affordable
housing
designed
to
increase
density
and
reduce
carbon
footprint
 with
green
(LEED)
construc3on. Small
restroom
facili3es
(2)
@
Coldstream
(Legacy
Trail)














500,000


50

Lexington

KY

CDBG












1,026,000


50

Lexington

KY

CDBG












1,271,000


52

Lexington

KY

CDBG

Transit
Center
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important
downtown
 public
parking
garage. Bluegrass
Community
&
Technical
College
Cer3fica3on
program
on
Green
Construc3on/Retrofiqng
&
 Installa3on/Conversion
to
Energy
Efficient
HVAC
Systems
courses. Downtown
Arts
Center;
Total
Renova3on
to
3rd
Floor
and
HVAC
to
Floors
3
&
4












1,150,000


58

Lexington

KY

CDBG

Coroner's
Office;
Total
Building
Renova3ons
including
HVAC












1,500,000


60

Lexington

KY

CDBG

Black
and
Williams
Center;
Total
BuildingRenova3on/HVAC/Plumbing
and
Windows












2,000,000


75

Lexington

KY

CDBG












2,181,000


75

Lexington

KY

CDBG

Government
Center
Parking
Garage
Restora3on.

Safety,
ADA,
and
structural
improvements
to
important
 downtown
public
parking
garage. Youth
Services;
Total
Building
Renova3on
including
HVAC
Improvements












3,000,000


85

Lexington

KY

CDBG

Fayefe
County
Courthouse;
Major
Renova3on/HVAC










23,000,000


90

Lexington

KY

CDBG












1,800,000


92

Lexington

KY

CDBG












6,150,000


100

Lexington

KY

CDBG












8,680,000


100

Lexington

KY

CDBG












3,000,000


100

Lexington

KY

CDBG












2,500,000


100

Lexington

KY

CDBG












6,000,000


100

Lexington

KY

CDBG

Rehab
the
former
Youth
Deten3on
Center
to
adequately
provide
for
programs
and
services
to
Lexington's
 youth
and
their
families. Build
4
mul3
use
fields
at
Shillito
with
lights
and
ar3ficial
turf
for
year‐round
play
of
expanding
youth
 popula3on
and
non‐tradi3onal
sports
without
dedicated
space.

Economic
Development
Opportunity Build
8
field
soccer
complex
at
Cardinal
Run
North
with
ar3ficial
turf
to
allow
for
3000
player
soccer
league
to
 con3nue
aber
loss
of
field
space
elsewhere.

Economic
Development
Opportunity develop
centralized
city‐wide
4
field
Football
Complex
with
ar3ficial
turf
to
avoid
'home‐away'
conflicts
and
 provide
safer
surface Isaac
Murphy
Memorial
Art
Garden
will
create
green
public
gathering
space
promo3ng
walkability,
 sustainability,
and
neighborhood
revitaliza3on. Lyric
Theatre
Renova3on
‐
renova3on
and
expansion
of
former
African‐American
theatre
for
performing
arts
 use,
a
local
African
American
Heritage
Museum,
and
mul3‐purpose
community
flex
space.
Building
is
LEED
 cer3fied. Pyramid
Park
redevelopment
in
conjunc3on
with
Dis3llery
District
TIF
project














150,000


100

City

State

Program

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

CDBG

Lexington

KY

Lexington

Project
Descrip3on Renovate
tennis
building
at
Shillito
Park
to
allow
for
year
round
instruc3on
and
regional
tournaments
to
visit
 the
area Terminal
Interiors
Renova3on
–
Baggage
Claim
&
Public
Lobby
Areas

Funding
Required

Jobs














400,000


100












6,814,000


100










12,000,000


132












1,500,000


150












4,330,000


185












8,000,000


200














400,000


200

Distrillery
District
public
improvements
to
include
new
sidewalks,
Town
Branch
Trail,
placement
of
u33lity
lines
 underground,
storm
drainage
improvements,
and
new
sanitary
lines Cost
increase
for
single
family
home
construc3on
to
be
built
to
Green
Build
Kentucky
Standards.










15,000,000


250












4,000,000


300












5,500,000


375

Energy

Funding
required
to
focus
on
remodeling
and
energy
efficiency
programs
to
Green
Build
Kentucky
Standard
 (includes
training
&
educa3on
programs). LED
street
name
signage














160,000


5

KY

Energy

Rebuild
Signalized
Intersec3on,
Cooper
Drive
at
University
Drive














200,000


5

Lexington

KY

Energy

Rebuild
Signalized
Intersec3on,
Rosemont
Garden
at
Southland
Dr














200,000


5

Lexington

KY

Energy

Rebuild
Signalized
Intersec3on,
Third
Street
at
Race
Street














200,000


5

Lexington

KY

Energy










15,000,000


10

Lexington

KY

Energy

Anaerobic
Composter
–
A
project
to
develop
an
anaerobic
compos3ng
system
for
food
waste
and
other
 organics
in
our
waste
stream.

This
process
will
generate
usable
electricity
for
homes
and
businesses
lowering
 our
carbon
footprint
by
virture
of
reducing
g Re‐build
Traffic
signals
in
downtown












1,600,000


15

Lexington

KY

Energy










12,500,000


20

Lexington

KY

Energy










12,000,000


35

Lexington

KY

Housing

Construct
a
construc3on/demoli3on
materials
recovery
facility
adjacent
to
the
construc3on/demoli3on
 landfill. Construct
regional
recycling
facility HHW
facility
and
green
industrial
park Facade
Rehabilita3on
for
both
Commercial
and
Residen3al
Proper3es
in
Distressed
Condi3on

Lexington

KY

Housing

Lexington

KY

Lexington

KY

Lexington

Build
a
Senior
Ci3zen
Center
to
provide
programs
and
services
to
meet
the
needs
of
Lexington's
growing
senior
 ci3zen
popula3on. Public
Safety‐
Construc3on
of
new
West
Sector
Roll
Call
Facility Rehab
exis3ng
underu3lized
structures
in
low
income
areas
to
establish
Neighborhood
Places,
a
one‐stop
 social
service
concept
which
brings
together
local,
state
and
community
agencies
to
provide
services
within
 neighborhoods. Castlewood
Community
Center
‐
replace
2
outdated
structures
with
30,000
b2
modern
fitness,
mee3ng,
 educa3on
space
in
income
challenged
area
of
the
community Construct
Community
Building
at
Coolavin
Park
in
the
center
of
an
economically
disadvantaged
neighborhood












1,000,000


40

Southend
Park
Mi3ga3on
Noise
Wall
Construc3on
(Newtown
Pike
Extension)












5,000,000


100

Housing

Equestrian
View
‐
102
units
of
Home
Ownership
constructed
by
Housing
Authority
to
EnergyStar
Standards.










10,200,000


105

Housing

Bluegrass
Aspendale
Phase
VI
‐
88
units
of
new
public
housing
constructed
by
Housing
Authority.












9,925,000


135

KY

Housing

Grand
Oaks
Phase
V
‐
88
units
of
new
public
housing.












9,515,000


135

Lexington

KY

Public
Safety

2010
World
Equestrian
Games
Na3onal
Criminal
History
Review

Lexington

KY

Public
Safety

2010
World
Equestrian
Games
Public
Safety/Equipment

Lexington

KY

Public
Safety

School
Resource
Officers














500,000


5

Lexington

KY

Public
Safety

Police
Central
Sector
Roll
Call;
Flooring
and
Pain3ng














100,000


8

Lexington

KY

Public
Safety

Police
East
Roll
Call;
Flooring














150,000


8

Lexington

KY

Public
Safety

Relocate
LFUCG
Communica3ons
Fiber
Op3c
for
South
Limestone
Streetscape
Project
















50,000


10

Lexington

KY

Public
Safety

Police
Gun
Range;
Flooring
and
Pain3ng/HVAC
Improvements














100,000


12

Lexington

KY

Public
Safety

Police
Mounted
Patrol;
Flooring/Pain3ng
and
Upgrade
PTAC
System
and
Controls
















81,000


12

Lexington

KY

Public
Safety

Police
Training
Center;
Flooring/Pain3ng
and
Replacement
of
Ladders
and
Controls














225,000


14

Lexington

KY

Public
Safety

Police
K‐9
Building;
Total
Building
Renova3ons
and
HVAC
Improvements
















95,000


15

Lexington

KY

Public
Safety

Police
West
Roll
Call
Center;
Renova3on
and
HVAC
Improvements














500,000


24

Lexington

KY

Public
Safety

Police
Headquarters;
Bathroom
Upgrades
and
HVAC
Upgrade












1,230,000


25

Lexington

KY

Public
Safety

Police
Technical
Services
Building;
Interior/Exterior
Pain3ng,
Loading
Dock
and
HVAC
Improvements












1,018,000


30

Lexington

KY

Public
Safety










35,000,000


312

Lexington

KY

Schools

Public
Safety
Opera3ons
Center
(PSOC)
to
integrate
911/311/EOC
and
communica3on
services
into
one
system
 and
facility. Major
Renova3on‐‐Arlington
Elementary
School










13,206,275


200

Lexington

KY

Schools

Major
Renova3on‐‐Bryan
Sta3on
Middle
School










16,983,245


200

Lexington

KY

Schools

Major
Renova3on‐‐Cassidy
Elementary
School










13,827,791


200

Lexington

KY

Schools

Major
Renova3on‐‐Leestown
Middle
School










18,227,636


200

Lexington

KY

Schools

Major
Renova3on‐‐Russell
Cave
Elementary
School












6,905,067


200

Lexington

KY

Schools

New
Construc3on/Major
Renova3on‐‐Central
School
Bus
Garage












5,676,676


200

Lexington

KY

Schools

New
Construc3on‐‐Equine
Agriscience
Educa3on
Center












7,500,000


200

Lexington

KY

Schools

New
Construc3on‐‐Lafayefe
High
School
Football
Stadium












6,500,000


200

Lexington

KY

Streets/Roads

Alumni
Drive,
Inbound,
Extend
Right
Through
Lane














400,000


10

Lexington

KY

Streets/Roads

Conversion
of
Third
Street
and
Fourth
Street
to
Two‐way
Traffic














100,000


10

Lexington

KY

Streets/Roads

Newtown
Pike
Extension
(Phase
4
Right‐of‐way
acquisi3on)












6,200,000


10

Lexington

KY

Streets/Roads

North
Limestone
Streetscape
Enhancements
north
of
4th
Street














250,000


10

Lexington

KY

Streets/Roads

Pine
Needles
Right
Turn
Lane
at
Man
O'
War














275,000


10

Lexington

KY

Streets/Roads

Railroad
Crossing
Repairs
at
6
loca3ons














100,000


10

Lexington

KY

Streets/Roads

Redding
Road
at
Lansdowne
Drive
Turn
Improvements
















95,000


10

Lexington

KY

Streets/Roads

Squires
Road
Sight
Distance
Improvements














290,000


10

Lexington

KY

Streets/Roads

Ward
Drive
Extension
















60,000


10

Lexington

KY

Streets/Roads

Waveland
Museum
Lane
Reconstruc3on
at
Railroad
Intersec3on














385,000


10

Lexington

KY

Streets/Roads

East
Third
Street
Streetscape
Enhancements














250,000


15

Lexington

KY

Streets/Roads

Midland
Avenue
widening
for
the
Bluegrass
Aspendale
Redevelopment














800,000


20

Lexington

KY

Streets/Roads

Newtown
Pike
Extension
(Mi3ga3on
Funding)












3,000,000


20

Lexington

KY

Streets/Roads

Mt
Tabor
Road
Widening,
Patchen
Drive
to
Richmond
Road












1,225,000


30

Lexington

KY

Streets/Roads

Construc3on
of
Salt
Barn
on
Athens‐Boonesboro












2,500,000


35














480,000
 










1,750,000


City

State

Program

Lexington

KY

Streets/Roads

Streetscape
Improvements
‐
Cheapeside
Park

Project
Descrip3on

Funding
Required 










2,000,000


Jobs 35

Lexington

KY

Streets/Roads

Lexington

KY

Streets/Roads

Newtown
Pike
Extension
(Phase
4
U3li3es)












1,100,000


50

Polo
Club
Blvd
Comple3on












3,400,000


Lexington

KY

50

Streets/Roads

Streetscape
Improvements
‐
Main
Street












4,500,000


Lexington

75

KY

Streets/Roads

Streetscape
Improvements
‐
Vine
Street












5,200,000


75

Lexington

KY

Streets/Roads

Streetscape
Improvements
Limestone
Ave












8,500,000


75

Lexington

KY

Streets/Roads

Newtown
Pike
Extension
(Road
and
Bridge
Construc3on
‐
Phase
4)












9,100,000


150

Lexington

KY

Transit

2010
World
Equestrian
Games
Transporta3on
management,
planning
and
infrastructure.












1,005,400


Lexington

KY

Transit

Acquisi3on
of
automated
fare
boxes
and
GPS
system
for
each
exis3ng
and
proposed
bus












1,600,000


Lexington

KY

Transit

Construc3on
of
bus
shelters.

Lexington

KY

Transit

Construc3on
of
new
transit
center
in
downtown
Lexington.










20,000,000


Lexington

KY

Transit

Renova3on
of
maintenance
&
opera3ons
facility
at
Loudon
Dr.












5,000,000


Lexington

KY

Transit

Courthouse
Parking
Garage;
Upgrade
Revenue
Producing
Equipment














100,000


3

Lexington

KY

Transit

Victorian
Square
Parking
Garage;
Upgrade
Revenue
Producing
Equipment














100,000


3

Lexington

KY

Transit

Transit
Center
Parking
Garage;
Upgrade
Revenue
Producing
Equipment














300,000


4

Lexington

KY

Transit

Addi3onal
cost
required
to
retrofit
4
trolley
buses
as
hybrid
technology.














816,000


5

Lexington

KY

Transit

Annex
Parking
Garage;
Concrete
Repairs














100,000


5

Lexington

KY

Transit

Graffi3
abatement
program
















75,000


5

Lexington

KY

Transit

Re‐pain3ng
traffic
signal
poles
















75,000


5

Lexington

KY

Transit

Courthouse
Complex
Parking
Garage
Repairs














250,000


8

Lexington

KY

Transit

Courthouse
Parking
Garage;
Concrete
Repair














250,000


8

Lexington

KY

Transit

Maxwell
Street
Bike/Pedestrian
Reconstruc3on,
North‐side














150,000


10

Lexington

KY

Transit

Shilito
Park
Trail














500,000


10

Lexington

KY

Transit

Southland
Bike
Lanes














500,000


10

Lexington

KY

Transit

Wayfinding
Signage














500,000


10

Lexington

KY

Transit

Acquisi3on
of
10
clean
diesel/bio
diesel
buses












3,200,000


15

Lexington

KY

Transit

Addi3onal
cost
required
to
make
the
10
diesel/bio
diesel
buses
run
on
hybrid
technology.












2,040,000


15

Lexington

KY

Transit

Transit
Center
Parking
Garage;
New
Ligh3ng/HVAC
Improvements














136,000


16

Lexington

KY

Transit

Lexington

KY

Transit

Legacy
Trail
(Newtown
Pike
to
Loudon
Ave).

Project
con3nues
signature
bike/ped
trail
through
major
 employment
areas. Improve
Pedestrian
Infrastructure
at
50
Intersec3ons

Lexington

KY

Transit

Lexington

KY

Transit

Lexington

KY

Transit

Lexington

KY

Transit

Lexington

KY

Transit

Lexington

KY

Transit

Lexington

KY

Water

Lexington

KY

Water

Lexington

KY

Lexington














150,000















750,000


20












1,000,000


30

Legacy
Trail
Bike/Pedestrian
Bridge
over
Newtown
Pike.

Bridge
would
connect
signature
bike/ped
trail
 segments,
offering
important
alterna3ve
transporta3on
route. Brighton
East
Rail
Trail












1,000,000


30












1,000,000


35

Legacy
Trail
(Loudon
Ave
to
Downtown).
Project
brings
signature
bike/ped
trail
from
heavy
employment
center
 to
central
business
district. Construct
and
install
bike
corrals
throughout
the
city
with
focus
in
areas
with
high
bike
and
pedestrian
traffic.












1,000,000


50














500,000


75












9,000,000


75










19,000,000


100














120,000


2












3,500,000


3

Water

Design
and
Installa3on
of
two
Centrifuges
for
Solids
Processing
at
the
Town
Branch
Wastewater
Treatment
 Plant Old
Frankfort
Pike
(Town
Branch)
Pump
Sta3on
and
Force
Main
Rehabilita3on












2,000,000


4

KY

Water

Purchase/Demoli3on
of
Homes

Flood
Mi3ga3on
Phase
I












1,000,000


4

Lexington

KY

Water












4,500,000


5

Lexington

KY

Water

Installa3on/Upgrade
of
security
systems
including
upgraded
fencing,
gates
and
camera/computer
systems
at
 both
the
Town
Branch
and
West
Hickman
Wastewater
Treatment
Plants Phase
3
Screw
Pump
Replacement












1,300,000


5

Lexington

KY

Water














300,000


7

Lexington

KY

Water

Installa3on
of
Fiber
at
Town
Branch
and
at
West
Hickman
Wastewater
Treatment
Plants
for
Technology
 Improvements Installa3on
of
Various
Equipment
Replacement/Upgrades
at
West
Hickman
Wastewater
Treatment
Plant

Lexington

KY

Water

Lexington

KY

Lexington

KY

Lexington

Healthway
Trail
System.
Complete
community‐wide
bike/ped
trail
system
connec3ng
residen3al,
employment
 and
recrea3onal
resources
throughout
Lexington. Lexington‐to‐Versailles
Rail
with
Trail
Project.

Innova3ve
15
mile
bike/ped
trail
u3lizing
exis3ng
ac3ve
railroad
 right‐of‐way
would
provide
alterna3ve
transporta3on
between
two
central
Kentucky
communi3es. Variable
Frequency
Drive
Replacement
at
eight
Schedule
A
pumping
sta3ons












1,475,000


7

Bowmans
Mill
Road
Culvert
Replacement














253,000


10

Water

Delong
Road
Culvert
Repair
















60,500


10

Water

Delong
Road
Culvert
Replacement














182,000


10

KY

Water

Installa3on
of
Various
Equipment
Replacement/Upgrades
at
Town
Branch
Wastewater
Treatment
Plant














900,000


10

Lexington

KY

Water

James
Lane
Culvert
Replacement














182,000


10

Lexington

KY

Water

Venture
Court
Pump
Sta3on
conversion














225,000


10

Lexington

KY

Water

West
Hickman
Creek
WWTP
Expansion
and
Solids
Process
Renova3on











18,000,000


10

Lexington

KY

Water

Lexington Louisville

KY KY

Water Airport














500,000
 










1,020,000


16 20














200,000


10

Louisville

KY

Airport














300,000


16

Louisville

KY

Airport














600,000


30

Louisville

KY

Airport

Paving
and
Repair
of
Roadways
on
the
campuses
of
the
Town
Branch
and
the
West
Hickman
Wastewater
 Treatment
Plants Sanitary
Sewer
System
Capacity
Improvements Airfield
Electrical
Ductbank
Reloca3on:
relocate
electrical
cables
and
a
ductbank
containing
a
number
of
 circuits
for
the
airfield
ligh3ng
system
to
ensure
access
to
facili3es Midfield
Access
Road
Upgrade:
upgrade
the
midfield
access
road
by
installing
drainage
pipes,
curbs
and
gufer
 sec3ons
to
secure
the
shoulder
and
adjacent
security
fence Aircrab
Apron
Reconstruc3on:
addresses
the
reconstruc3on
of
various
aircrab
aprons
at
Bowman
Field,
an
 airport
that
reduces
the
air
traffic
of
smaller
propeller
aircrab
at
Louisville
Interna3onal
Airport T‐Hangar
Construc3on:
construc3on
of
T‐hangers
at
Bowman
Field
to
replace
exis3ng
units
with
updated
and
 modern
facili3es
for
the
popula3on
base
at
this
facility












2,500,000


175

City

State

Program

Louisville

KY

Airport

Louisville

KY

CDBG

Crifenden
Drive
Reloca3on:
The
reloca3on
of
Crifenden
Drive
from
just
south
of
I‐264
(Waferson
 Expressway)
to
the
Chautauqua
Maintenance
hangar
is
necessary
to
facilitate
the
construc3on
of
a
taxiway
 parallel
to
the
west
runway
at
Louisville
Interna3onal Engine
2,
22,
6,
15
Apparatus

Project
Descrip3on

Louisville

KY

CDBG

Truck
1
Apparatus














925,000


Louisville

KY

CDBG














350,000


8

Louisville

KY

CDBG

Preston
Corridor
Streetscape
–
Sidewalk,
landscape
and
other
streetscape
improvements
to
improve
the
 availability
of
neighborhood
serving
retail.
Approximately
3,400
linear
feet LMPD
Headquarters
Roof
Replacement
–
Replace
exis3ng
built‐up
roof
w/
a
new
roof














500,000


12

Louisville

KY

CDBG














300,000


12

Louisville

KY

CDBG

Metro
Correc3ons
Headquarters
Roof
Replacement
–
Replace
exis3ng
original
built‐up
roof
w/
a
new
built‐up
 roof Hall
of
Jus3ce
Escalator
Replacement
–
Replace
exis3ng
escalators
(2)
equipment
and
controls.














500,000


14

Louisville

KY

CDBG














600,000


14

Louisville

KY

CDBG














500,000


14

Louisville

KY

CDBG














125,000


15

Louisville

KY

CDBG














350,000


15

Louisville

KY

CDBG














500,000


15

Louisville

KY

CDBG














150,000


15

Louisville

KY

CDBG














650,000


16

Louisville

KY

CDBG














250,000


17

Louisville

KY

CDBG

Buechel
Area
Business
Improvement
District‐
Sidewalk,
landscape
and
other
streetscape
improvements;
 drainage
improvements;
all
work
is
meant
to
improve
corridor
to
afract
more
business.
Approximately
4,900
 linear
feet Hampton
House
Exterior
Restora3on
‐

Tuckpoin3ng,
pain3ng,
cornice
&
porch
repair,
and
new
standing
seam
 roof
on
a
Public
Health
Department
outreach
center. City
Hall
Elevator
Replacement
–
Replace
exis3ng
elevators
(2)
equipment
and
controls.














250,000


20

Louisville

KY

CDBG

Expansion
of
the
Automo3ve
Service
Facility
to
improve
service
to
the
EMS
Fleet

Louisville Louisville

KY KY

CDBG CDBG

Lead
Abatement
Ac3vi3es:
reduce
lead
hazards
in
single‐unit
and
mul3‐unit
residences,
focusing
on
the
 Metro
Hall
Elevator
Replacement
–
Replace
exis3ng
elevators
(2)
equipment
and
controls.














410,000
 










1,000,000


20 20














250,000


20

Louisville

KY

CDBG

Tree
plan3ng
1000
trees
in
CDBG
eligible
parks














500,000


20

Louisville

KY

CDBG

Urban
Government
Center
–
850
Building
Roof
Replacement
–
Replace
exis3ng
built‐up
roof
w/
a
new
roof.














200,000


20

Louisville

KY

CDBG














250,000


22

Louisville

KY

CDBG

617
West
Jefferson
Roof
Replacement
and
Skylight
Restora3on
Replace
exis3ng
built‐up
roof
w/
a
new
roof
and
 restore
historic
skylight. Memorial
Auditorium
Roof
Replacement
–
Replace
exis3ng
roof
w/
new
roof














400,000


24

Louisville

KY

CDBG














625,000


24

Louisville

KY

CDBG














250,000


26

Louisville

KY

CDBG














800,000


26

Louisville

KY

CDBG

Urban
Government
Center
–
810
Building
Elevator
Replacement
–
Replace
exis3ng
elevators
(3)
equipment
and
 controls. Fiscal
Court
Building
Lobby
Renova3on
–
Public
Lobby
renova3on
to
improve
ADA
access
to
elevators
and
 restrooms. Western
Branch
Library
Rehabilita3on:
Renovate
interior
of
historic
Carnegie
library
and
convert
mee3ng
room
 into
African‐American
archive
space
and
study
center. City
Hall
Annex
Roof
Replacement
–
Replace
mul3ple
exis3ng
built‐up
roofs
w/
new
built‐up
roofs.














450,000


28

Louisville

KY

CDBG

City
Hall
Exterior
Restora3on
–
Limestone
cleaning
and
tuckpoin3ng
&
window
pain3ng












1,400,000


28

Louisville

KY

CDBG

City
Hall
Roof
Replacement
–
Replace
numerous
roofs
on
historic
city
hall

Louisville Louisville

KY KY

CDBG CDBG

28 28

Louisville

KY

CDBG

Memorial
Auditorium
Exterior
Restora3on
–

Exterior
Restora3on
consis3ng
of
Limestone
cleaning
and
 Repair
and
refurbish
York
Street
Entrance
at
lobby
at
the
Main
Branch
Library:
repair
and
repaint
plaster
walls;
 clean
historic
murals;
make
minimal
repairs
to
marble
floor
and
walls;
repair
electrical
system;
replace
ligh3ng
 with
energy
efficient
fixtur Construct
a
new
West
Entry
and
paths
along
the
Algonquin
Pavilion














450,000
 










1,250,000


Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Shawnee
Branch
Library
Rehabilita3on:
Rehab
and
restore
exis3ng
7,000
square
foot
historic
WPA‐era
library
 and
add
3,000
square
feet
of
new
library
space.

Louisville

KY

CDBG

Louisville

KY

CDBG

PW&A
Fleet
Services
Division
Design/Build
Renova3on
&
construc3on
project
to
consolidate
the
Fleet
services
 division
into
a
new
facility
on
Millers
Lane Sidewalks:
Proposed
funding
would
allow
for
replacement
of
approximately
50,000
linear
feet
of
sidewalk
in
 CDBG
eligible
areas.

University
Corridor
Redevelopment
‐
Sidewalk,
landscape
and
other
streetscape
improvements;
land
 acquisi3on;
street
lane
improvements
to
accommodate
cars,
trucks,
pedestrians
and
bikes;
all
work
is
meant
to
 connect
University
to
surrounding
neighborhood. West
Market
Street
Corridor
Improvements‐
Sidewalk,
landscape
and
other
streetscape
improvements;
land
 acquisi3on;
to
improve
the
availability
of
neighborhood
serving
retail.
Approximately
7,000
linear
feet City
Hall
Annex
Elevator
Replacement
–
Replace
exis3ng
elevator
equipment
and
controls. Elevator
Installa3on
at
Fire
Headquarters:
Construc3on
of
an
elevator
shab,
elevator,
and
ves3bule
at
Louisville
 Division
of
Fire
Headquarters
to
allow
ADA
access
to
second
floor
and
basement. LMPD
Headquarters
Repair
and
Restora3on
‐
Granite
and
marble
exterior
restora3on
and
window
 replacement. Science
Center
Annex
Elevator
Replacement
–
Replace
exis3ng
elevator
equipment
and
controls.

Funding
Required










27,500,000


Jobs

500












2,000,000















350,000


32












2,500,000


35

Metro
Hall
Exterior
Restora3on
–
Exterior
Stone
Restora3on
,
Stucco
Repair
&
Masonry
Coa3ng.












1,200,000


36

Code
Allevia3on
Ac3vi3es:
assist
owner‐occupants
with
elimina3ng
exterior
code
viola3ons. Target
areas
include
the
Smoketown,
Shelby
Park,
Phoenix
Hill,
Shawnee,
California,
Oakdale,
Portland,
&
 Shagbark/Shanks
Lane
neighborhoods. Riverside
Landing
Water
Supply,
Electric
Supply,
Sep3c
System,
and
Paving












7,000,000


50












2,500,000


50












2,000,000


50












1,400,000


68












1,050,000


72












2,700,000


76












8,000,000


92












2,100,000


98












8,000,000


198












2,000,000


200

Weatheriza3on
Ac3vi3es:
stabilize
exis3ng
housing
stock
by
replacing
energy
systems
including
but
not
limited
 to,
furnaces,
water
heaters,
duct
work,
and
carbon
dioxide
and
smoke
detectors.
Target
areas
include
the
 Smoketown,
Shelby
Park,
Phoenix
Hill Portland
Branch
Library
Renova3on:
Repair
and
restore
exterior;
remodel
and
restore
interior
of
historic
 Carnegie
library. Installa3on
of
flat
floor
mul3‐purpose
auditorium
and
program
space
at
Main
Branch
Library:
replace
oversized
 windows
with
energy
efficient,
historically
appropriate
windows;
remove
any
asbestos
adhesive
and
replace
 ceiling
materials;
replace
ligh3ng Main
Branch
Library
Rehabilita3on:
Convert
&
restore
east
wing
to
children’s
area;
rebuild
plaza
walkways;
 repair
and
clean
exterior
of
buildings;
renovate
public
service
spaces;
replace
HVAC
systems
in
1908
building;
 remodel
book
sor3ng
area
&
delivery Belvedere
Restora3on
–
Reinforce
plaza
structure
to
accommodate
increased
loading
condi3ons,
waterproof
 exis3ng
structural
slabs
and
remove
and
reinstall
concrete
pavers.

City

State

Program

Louisville

KY

CDBG

Project
Descrip3on

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

CDBG

Louisville

KY

Energy

Home
repair
ac3vi3es
of
low‐income
households:
various
home
improvement
ac3vi3es
for
cri3cal
and
non‐ cri3cal
home
improvements
for
persons
from
low‐income
households. Street
Resurfacing:
Proposed
funding
would
allow
for
143
miles
of
roads
to
be
resurfaced
in
CDBG
eligible
 areas
within
one
season,
which
is
approximately
8
months
out
of
the
year. Park
Hill
Corridor
Improvement
Plan–
Plan
addresses
how
to
improve
the
corridor
to
make
it
more
func3onally
 appealing
for
exis3ng
businesses
and
residents
with
the
intent
of
afrac3ng
more:
connect
and
widen
streets
 when
appropriate;
improve
truck
and Controllers
for
tennis
court
lights
at
15
loca3ons
totaling
77
courts
to
restrict
ligh3ng
to
periods
of
actual
use

Louisville

KY

Energy

Convert
200
vehicles
(tractors
and
trucks)
to
use
alterna3ve
fuel
mix

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Energy
Efficient
Street
Lamps
 •Replace
200
low
func3oning
VISCO
streetlights
with
HADCO
poles
with
energy
efficient
LED
lamps
and
long
 las3ng
glass
or
acrylic
globes
– LMHW
Lab
Building
AHU
&
Boiler
Replacement
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
 system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
 enhanced
comfort
and
reduced
first
cost
and
opera3n LMPD
Headquarters
Air
Handling
Unit
&
Chiller
replacement
‐
Replace
the
exis3ng
energy
inefficient
and
 unreliable
HVAC
system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
 emissions,
enhanced
comfort
and
reduced
first Metro
Development
Center
Cooling
Tower
and
Unit
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and
 unreliable
HVAC
system
with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
 emissions,
enhanced
comfort
and
reduced
firs Metro
Hall
Annex
Boiler
Replacement
‐
Replace
exis3ng
inefficient
5
boilers
&
misc
HVAC
with
a
new
HVAC
 system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort
and
reduced
 first
cost
and
opera3ng
expenses. Newburg
Branch
Library:

Add
photovoltaic
solar
panels
as
electric
power
source.

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Emergency
Repair
Ac3vi3es:
rehabilitate
single
unit
residences
in
“emergency
situa3ons”
determined
by
 Louisville
Metro
Housing
&
Community
Development.
Target
areas
include
the
Smoketown,
Shelby
Park,
 Phoenix
Hill,
Shawnee,
California,
Oakdale,
Portlan Retrofiqng
owner‐occupied
houses
of
low‐income
households:
repain3ng
interior
and
exterior
walls
with
 ceramic
insula3ng
paint;
including
aqc
insula3on
to
R‐38;
addi3on
of
storm
windows
and
doors;
 caulking/weatherstripping Alley
Paving:
Proposed
funding
would
allow
for
62
miles
of
alleys
in
CDBG
eligible
areas
to
be
paved.

Old
Jail
Boiler
&
Unit
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a
 new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort
 and
reduced
first
cost
and
opera3ng
expe City
Hall
Annex
HVAC
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a
 new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort
 and
reduced
first
cost
and
opera3ng
expens Newburg
Community
Center
Geothermal
HVAC‐Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
 system
with
a
new
geothermal
heat
pump
system;
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50
 percent
and
lowering
cooling
bill Youth
Deten3on
Services
Chiller
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
 equipment
with
a
new
equipment
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
 comfort
and
reduced
first
cost
and
opera3ng
expens 617
West
Jefferson
Green
Plumbing
Project
‐
replace
domes3c
water
heater
with
solar
water,
replace
plumbing
 fixtures
w/low
water
capacity
fixtures
and
install
grey
water
cistern
to
collect
roof
storm
water
for
grey
water
 toilet
flushing. 617
West
Jefferson
HVAC
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
 with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
 comfort
and
reduced
first
cost
and
opera3ng
exp Science
Center
Annex
Green
Roof

‐
replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng
 environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water
 run‐off
that
otherwise
would
enter
the
sewer Science
Center
Green
Roof
‐
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng
environmental
 sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water
run‐off
that
 otherwise
would
enter
the
sewer
system Central
Government
Building
Geothermal
HVAC
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
 system
with
a
new
geothermal
heat
pump
system;
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50
 percent
and
lowering
cooling
bills
up
to
30
pe SW
Government
Center
Geothermal
HVAC Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a
new
geothermal
heat
pump
system;
 thus
lowering
the
hea3ng
bills
for
the
building
up
to
50
percent
and
lowering
cooling
bills
up
to
30
percent Urban
Government
Center
850
Geothermal
HVAC
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
 system
with
a
new
geothermal
heat
pump
system.
thus
lowering
the
hea3ng
bills
for
the
building
up
to
50
 percent
and
lowering
cooling
bills
up
to
30
pe Mary
T.
Meager
Aqua3c
Facility
Retrofit
including
energy
efficient
HVAC,
solar
water
hea3ng
system
and
 building
insula3on Metro
Archives
&
LMPD
Property
Building
Green
Roof
–
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green
 Roof;
promo3ng
environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
 capture
storm
water
run‐off
that
otherwise
wou Metro
Development
Center
Solar
Panel
System:

install
south
facing
solar
panels
for
the
building.
The
panels
 will
be
used
to
supply
domes3c
hot
water
for
the
building.
Addi3onally
,
solar
panels
will
be
u3lized
to
produce
 electricity
for
the
building. Fairdale
Health
Center
Geothermal
HVAC
and
Playtorium
–
Replace
the
exis3ng
energy
inefficient
and
 unreliable
HVAC
systems
with
new
geothermal
heat
pump
systems,
thus
lowering
the
hea3ng
bills
for
the
 building
up
to
50%
&
lowering
cooling
bills
up
to
30 Park
Hill
Green
Strategies •Building
–
Update
Metro‐owned
building
to
green
retro‐fit;
include
renewable
energy
techniques
 •Rhodia
Site
(Metro‐owned
property)–
Brownfield/storm
water
management
demonstra3on
area
 •Urban
forests
as
carbon
sequestra3o

Funding
Required

Jobs












3,500,000


300












1,800,000


300












4,000,000


500












1,600,000


800










10,000,000


1200










22,500,000


2200














100,000


2














240,000


5














500,000


10














400,000


15














500,000


15














450,000


15














500,000


15














200,000


18














500,000


18














400,000


20














550,000


20














800,000


20














150,000


22














750,000


22














300,000


22














280,000


22














750,000


24














900,000


24














800,000


24












2,600,000


25














785,000


28












1,000,000


28














580,000


30












1,650,000


30

City

State

Program

Louisville

KY

Energy

Project
Descrip3on

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Energy

Louisville

KY

Housing

Louisville

KY

Housing

Construct
a
methane
produc3on
facility
on
the
zoo
campus
that
is
powered
by
methane
gas
from
animal
 waste.
 Drainage
and
sewer
line
replacement
at
Parkway
Place,
a
600
unit
Public
Housing
Apartment
structure
located
 at
13th
and
Hill Generator
replacement
on
the
Bishops
Lane
Senior
Living
Facility

Louisville

KY

Housing

Louisville

KY

Louisville

Urban
Gov.
Center
810
Green
Roof
‐
Replace
the
exis3ng
built‐up
roof
w/
a
new
Green
Roof;
promo3ng
 environmental
sustainability
and
environmentally
beneficial
ini3a3ves.
Green
roofs
help
capture
storm
water
 run‐off
that
otherwise
would
enter
the
sewer Memorial
Auditorium
HVAC
Replacement
–
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
 with
a
new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
 comfort
and
reduced
first
cost
and
opera3ng
ex Hall
of
Jus3ce
HVAC
Replacement
‐
Replace
the
exis3ng
energy
inefficient
and
unreliable
HVAC
system
with
a
 new
HVAC
system
designs
providing
higher
energy
efficiency,
reduced
carbon
emissions,
enhanced
comfort
 and
reduced
first
cost
and
opera3ng
expens Metro
Louisville
Solar
Street
Ligh3ng
–
Replacement
of
exis3ng
electric
street
ligh3ng
to
solar
powered
street
 lights Retrofit
Golf
Clubhouses
including
solar
water
hea3ng
systems,
efficient
ligh3ng,
geothermal
HVAC,
building
 insula3on,
etc.
at
Shawnee,
Seneca,
Bobby
Nichols,
Cherokee,
Crescent
Hill,
Sun
Valley
and
Iroquois
Parks Recycling
Program
Enhancement
Equipment:

Purchase
and
distribu3on
of
100,000
programmable
recycling
 carts
to
enhance
recycling
par3cipa3on
&
thereby
reduce
landfill
volumes. Air
Pollu3on
Control
Headquarters
Renova3on
Renova3on
and
new
construc3on
to
consolidate
the
local
air
 pollu3on
regulatory
agency
into
a
centrally
located
facility.
Green
building
prac3ces,
solar
collec3on
and
a
 geothermal
HVAC
system
will
be
inclu Zoo
Energy
Efficiency
Improvements Replace
single
pane
windows,
install
insula3on
and
improve
heat
delivery
systems;
install
green
roofs;
enhance
 the
water
and
energy
efficiencies
to
the
collec3on
life
support
systems

Funding
Required

Jobs












1,000,000


30












1,500,000


36












2,000,000


40












2,000,000


40












2,100,000


40












7,000,000


100












2,800,000


120












5,000,000


250










15,000,000


750














150,000


2














150,000


2

Replace
the
generator
at
Lourdes
Hall,
a
62
unit
Senior
Living
Facility














150,000


2

Housing

Replace
the
emergency
no3fica3on
intercom
system
at
Lourdes
Hall,
a
62
unit
Senior
Living
Facility














200,000


3

KY

Housing

Concrete
stair
replacement
at
Public
Housing
Apartment
units
(550
Apartments)














100,000


5

Louisville

KY

Housing














400,000


5

Louisville

KY

Housing

Replacement
of
the
parapets
(post
and
guardrail
like
structures)
on
the
Dosker
Manor
Senior
Living
Center,
a
 structure
with
over
685
units. Replacement
of
the
windows
at
St.
Mar3ns,
a
public
housing
apartment
unit
on
the
na3onal
history
registry














296,200


5

Louisville

KY

Housing

Upgrading
elevators
at
Avenue
Plaza
Senior
Living
Center














400,000


5

Louisville

KY

Housing

Upgrading
elevators
at
the
Dosker
Manor
Senior
Living
Center












2,200,200


5

Louisville

KY

Housing

Roof
replacement
on
the
Tonini
Building,
a
historic
structure
owned
by
the
Housing
Authority














320,000


6

Louisville

KY

Housing














250,000


10

Louisville

KY

Housing

Renova3on
and
conversion
of
the
remains
of
DuValle
Liquors,
a
liquor
store
purchased
by
the
Housing
 Authority
to
remove
blight Replacement
of
the
roof
on
the
Vine
Street
public
housing
unit
with
a
green
roof














300,000


10

Louisville

KY

Housing

Cabinet
replacement
at
200
scafered
site
loca3ons














200,000


12

Louisville

KY

Housing

Roof
replacement
at
50
scafered
site
loca3ons














200,000


12

Louisville

KY

Housing

Roof
replacement
at
Public
Housing
Apartment
units
(550
Apartments)














150,000


12

Louisville

KY

Housing

Roof
replacement
on
the
Bishops
Lane
Senior
Living
Facility














190,000


12

Louisville

KY

Housing

Renova3on
and
Conversion
of
537
East
Breckenridge
back
to
a
single
family
home














225,000


20

Louisville

KY

Housing














900,000


20

Louisville

KY

Housing

Stove,
and
gas
line
conversion
to
electric
for
Parkway
Place,
a
600
unit
Public
Housing
Apartment
structure
 located
at
13th
and
Hill The
construc3on
of
three
lease‐to‐own
houses














375,000


20

Louisville

KY

Housing












3,350,000


30

Louisville

KY

Housing

The
building
of
a
2‐story
community
center
for
seniors
for
non
sports
related
ac3vi3es
at
the
Liberty
Green
 Housing
Redevelopment Demoli3on
of
16
public
housing
units
at
the
Iroquois
Public
Housing
Project












1,328,000


200

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Louisville

KY

Public
Safety

Dash‐Mounted
Mobile
Video
Cameras
for
Police
Patrol
Vehicles:

LMPD
installs
dash‐mounted
video
cameras
in
 marked
police
vehicles
to
record
interac3ons
between
officers
and
ci3zens.

The
current
model
uses
digital
 recording
technology
and
interfaces
wit Mobile
Data
Terminals
(MDTs)
for
Police
Vehicles:
LMPD
needs
to
replace
350
MDTs
to
ouzit
new
patrol
 vehicles
and
upgrade
older
equipment.
MDTs
are
used
by
officers
to
view
and
respond
to
calls
for
service,
 paperless
repor3ng,
electronic
cita3ons,
view Records
Management
System
(RMS)
upgrade:
add
addi3onal
sobware
to
interface
with
records
management
 system.
One
program
will
allow
more
efficient
tracking
of
purchases
by
pawn
brokers
and
scrap
metal
dealers.
 This
will
allow
inves3gators
to
track
possi TASER
Cameras:

LMPD
has
1120
Taser
Electronic
Control
Weapons
deployed
to
officers.

Taser
Interna3onal
 offers
an
upgrade
that
replaces
the
standard
bafery
with
a
bafery
and
camera.

The
camera
captures
the
 interac3on
between
the
officer
and
suspect, LMPD
Mounted
Patrol
Renova3on
&
Addi3on
‐

Moderniza3on
of
the
original
park
riding
stable
barn
into
a
 headquarters
for
the
mounted
patrol. Fire
Headquarters
Elevator
‐
Install
new
elevator
for
Handicapped
Access
to
2nd
Floor LMPD/LMCD
Jail
Smoke
Evacua3on/HVAC
System
Renovate
and
install
new
code
required,
life
safety
smoke
 evacua3on
system
for
inmate
housing
on
the
third
floor
of
the
police
headquarters
building.
This
project
will
 also
replace
exis3ng
HVAC
system
w/
a
new Louisville
Fire
Academy
Addi3on
–
a
new
a
mul3‐purpose
building
w/
two
addi3onal
classrooms
will
be
added
 to
the
campus COPS
Hiring
Grants
(50
Officers):
LMPD
would
like
to
hire
to
full
authorized
strength
of
1257
sworn
personnel,
 then
hire
an
addi3onal
50
officers
funded
by
COPS
hiring
grants. Firearms
Training
Center
(FTC)
Expansion:

LMPD
is
currently
expanding
FTC
from
a
12
lane
facility
to
a
24
lane
 facility.

The
expansion
is
necessary
to
accommodate
a
merged
police
force
and
several
other
peer
agencies.

 Ashland
Fire
Sta3on
10
Construc3on
of
a
new
4‐bay
District
Fire
Sta3on
consis3ng
of
twelve
sleeping
rooms,
 offices,
lounge,
and
support
spaces.
This
facility
will
also
include
a
fueling
center.














780,000













2,557,000















410,400















425,544
 












200,000


12














270,000


18














750,000


20














500,000


44












2,443,517


50












1,800,000


99












4,000,000


153

City

State

Program

Louisville

KY

Public
Safety

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Schools

Louisville

KY

Streets/Roads

Louisville

KY

Streets/Roads

Louisville

KY

Streets/Roads

Public
Safety
Radios
–
Metro
Louisville
is
currently
construc3ng
the
infrastructure
for
an
800
Mhz
interoperable
 radio
system
for
first
responders.
Aber
this
system
is
completed
the
radios
must
be
purchased
&
programmed
 to
provide
common
radio
frequenci Cochrane
School
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing;
 refurbishing
of
ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
 lock
conversion. Field
Elementary
Construc3on:
Construc3on
of
playtorium
and
renova3on
of
exis3ng
Gym
to
new
Media
 Center
and
renova3on
of
exis3ng
media
center
to
Art/Resource
rooms
and
associated
work Hite
Elementary:
Removal
of
portables,
roofing,
window
replacement,
floor
3le,
pain3ng,
ceiling
&
lights
in
 corridors
&
classrooms,
paving,
and
lock
conversion. Johnsontown
Road
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
 ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
 conversion. Kennedy
Montessori
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
 ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
 conversion. King
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
lights
 in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Middletown
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
 &
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Mill
Creek
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Rangeland
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Sanders
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Trunnell
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Waferson
Elementary
:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion
and
 restroom
addi3on. Wheeler
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion. Wilkerson
Tradi3on
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
 ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
 conversion. Wilt
Elementary:
Removal
of
portables,
roofing,
window
replacement,
floor
3le,
pain3ng,
Ceiling
&
lights
in
 corridors
&
classrooms,
paving,
and
lock
conversion. Greenwood
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
 &
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
&
lock
conversion;
 Purchasing
of
a
new
elevator. Roosevelt
Perry
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
 ceiling
&
lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion,
 and
elevator. Smyrna
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion
and
 elevator. Wellington
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
lock
conversion,
and
 elevator. Wheatley
Elementary:
Removal
of
portables,
classroom
conversion
of
exis3ng
media
center,
roofing,
ceiling
&
 lights
in
corridors
&
classrooms,
windows,
paving,
pain3ng,
floor
3le
replacement,
and
lock
conversion.

New
 Elevator Kammerer
Middle
School
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in
 corridors
&
classrooms,
windows,
pain3ng,
paving,
floor
3le
replacement,
office
renova3on,
and
lock
 conversion. Southern
HS
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&
 classrooms,
windows,
lock
conversion. Valley
High
School
Phase
1
Renova3on
&
construc3on
of
a
new
auditorium
with
gymnasium:
HVAC
 replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&
classrooms,
windows,
pain3ng,
paving,
floor
3le
 replacement,
office
renova3on,
and
lock
conve Noe
Middle
School
Phase
1
Renova3on:
HVAC
replacement
or
upgrade,
roofing,
ceiling
&
lights
in
corridors
&
 classrooms,
windows,
pain3ng,
paving,
floor
3le
replacement,
office
renova3on,
lock
conversion,
and
elevator
 replacement. Purchase
of
school
buses
older
than
the
14‐year
replacement
cycle:
includes
154
66‐passenger
regular
buses,
 38
52‐passenger
buses
with
ECE
and
A/C,
18
passenger
buses
with
libs
and
five
22‐passenger
ECE
buses Cedar
Creek
–
0.92

miles
(Bates
to
Heritage
Creek)Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
 resurface
at
the
loca3ons
below: Mt
Washington
–
1.0
miles
(Rocky
Road
to
Cedar
Creek) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Ohio
River
Levee
Trail
–
13,000
linear
feet
between
Riverside
Historic
Site
and
Mill
Creek
genera3ng
sta3on

Project
Descrip3on

Louisville

KY

Streets/Roads

Rehl
Rd
‐
0.40
miles
(S.
Pope
Lick
to
S.
English
Sta3on)

Louisville

KY

Streets/Roads

Louisville

KY

Streets/Roads

Louisville

KY

Streets/Roads

Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Rehl
Road

‐
retaining
wall
near
Pope
Lick
Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐ build
roadside
and
improve
drainage
to
stabilize
roadways. Wibble
Hill
Rd

‐
0.71
miles Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Blevins
Gap
Bridge
Replacement
(2700)

Funding
Required

Jobs










11,000,000


700












1,849,200


62












1,707,750


62












1,535,250


62












1,806,650


62












2,107,950


62












1,702,000


62












2,018,250


62












2,119,450


62












2,282,750


62












2,390,850


62












2,507,000


62












3,377,550


62












1,711,200


62












1,844,600


62












2,179,250


62












2,156,250


65












3,059,000


65












3,320,050


65












3,007,250


65












2,099,900


65












6,681,500


112










16,008,000


112










23,581,500


112












9,407,000


115










15,744,981


430














250,000


7














350,000


7














390,000


7














200,000


7














250,000


7














400,000


7














140,000


10

City

State

Program

Louisville

KY

Streets/Roads

Blevins
Gap
Bridge
Replacement
(4410)

Project
Descrip3on

Funding
Required 












200,000


Jobs 10

Louisville

KY

Streets/Roads

Broad
Run
Bridge
Replacement
(9220)N














135,000


10

Louisville

KY

Streets/Roads

Broad
Run
Bridge
Replacement
(9220)S














135,000


10

Louisville

KY

Streets/Roads

Broad
Run
Bridge
Replacement
(9403)














135,000


10

Louisville

KY

Streets/Roads

Broad
Run
Road
at
Broad
Run
Creek
(C‐168)














500,000


10

Louisville

KY

Streets/Roads

Broad
Run
Road
over
Back
Run
Creek
(C‐169)














500,000


10

Louisville

KY

Streets/Roads

Clark
Sta3on
Road
Bridge
Replacement
(2202)














125,000


10

Louisville

KY

Streets/Roads














500,000


10

Louisville

KY

Streets/Roads












1,000,000


10

Louisville

KY

Streets/Roads














500,000


10

Louisville

KY

Streets/Roads












1,250,000


10

Louisville

KY

Streets/Roads












1,000,000


10

Louisville

KY

Streets/Roads

Easum
Rd
‐

1.17
miles
(Billtown
to
Chenoweth)
Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
 resurface. Factory
Lane
–
1.54
miles Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Fairmount
Rd
–
0.71
miles
(Bardstown
Rd.
to
Gentry
Ln.) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Independence
School
Road

‐
2.23
miles Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Lover
Ln
–
1.44
miles
(Veterans
to
Billtown) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Lyndon
Lane
over
Middle
Fork
of
Beargrass
Creek














450,000


10

Louisville

KY

Streets/Roads














250,000


10

Louisville

KY

Streets/Roads














700,000


10

Louisville

KY

Streets/Roads

Mitchell
Hill
Road
Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐build
roadside
and
 improve
drainage
to
stabilize
roadways. Mud
Lane
–
1.0
mile
(Blue
Lick
Road
to
Bier
Dr) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: New
Cut
over
Bee
Lick
Creek
Bridge
Replacement














275,000


10

Louisville

KY

Streets/Roads

Old
Heady
over
Drakes
Branch
Bridge
Replacement














450,000


10

Louisville

KY

Streets/Roads

Old
Taylorsville
Road
Bridge
Replacement
(5601)














100,000


10

Louisville

KY

Streets/Roads

Old
Westport
over
Goose
Creek
Bridge
Replacement














275,000


10

Louisville

KY

Streets/Roads














700,000


10

Louisville

KY

Streets/Roads

Poplar
Lane
–
1.13
miles Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Rehl
Rd

‐
1.3
miles
(Blankenbaker
to
Snyder
Freeway)

10

KY

Streets/Roads

Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: River
Road

Bridge
Replacement
(7505)














525,000


Louisville














200,000


10

Louisville

KY

Streets/Roads












1,250,000


10

Louisville

KY

Streets/Roads

S.
English
Sta3on
Rd
–
2.10
miles
(Poplar
Ln
to
Echo
Tr.) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: S.
Pope
Lick
Rd.
Bridge
Replacement
(2213)














175,000


10

Louisville

KY

Streets/Roads

Seatonville
Rd
Bridge
Replacement
(11221)














155,000


10

Louisville

KY

Streets/Roads

Stout
Road
at
Floyds
Fork
Tributary

Bridge
Replacement














125,000


10

Louisville

KY

Streets/Roads

Urton
Lane
Bridge
Replacement
(12509)














145,000


10

Louisville

KY

Streets/Roads

Blevins
Gap
Bridge
Replacement
(3907)














145,000


12

Louisville

KY

Streets/Roads

Blevins
Gap
Bridge
Replacement
(4021)














175,000


12

Louisville

KY

Streets/Roads

South
English
Sta3on
Bridge
Replacement
(1905)














175,000


12

Louisville

KY

Streets/Roads












1,000,000


15

Louisville

KY

Streets/Roads

Broad
Run
Road:

Roadways
are
sliding
down
adjacent
slopes.

We
will
excavate
and
re‐build
roadside
and
 improve
drainage
to
stabilize
roadways. Clark
Sta3on
Road
Bridge
Replacement
.5
M
S














225,000


15

Louisville

KY

Streets/Roads












1,500,000


15

Louisville

KY

Streets/Roads

Johnson
Road
–
2.0
miles
(Aiken
Road
to
CSX
RR) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Old
Taylorsville
over
Dunbar
Creek
Bridge
Replacement














275,000


15

Louisville

KY

Streets/Roads

Mill
Creek
shared
use
path
–
24,000
linear
feet
between
Sylvania
Park
and
Sun
Valley
Park












1,200,000


25

Louisville

KY

Streets/Roads












1,300,000


25

Louisville

KY

Streets/Roads

Old
Heady

‐
1.7
miles(Taylorsville
to
Snyder
Freeway) Widen
pavement

to
18
to

20
feet
with
2
foot
shoulder
and
resurface
at
the
loca3ons
below: Easun
Road
Bridge
Replacements














495,000


30

Louisville

KY

Streets/Roads

Penile
Road
Bridge
Replacements














425,000


30

Louisville

KY

Streets/Roads

Southern
Parkway
shared
use
path












1,620,000


35

Louisville

KY

Streets/Roads

A.
B.
Sawyer
greenway
and
connector
trails














560,000


40

Louisville

KY

Streets/Roads

Bearcamp
Road

Bridge
Replacements














610,000


40

Louisville

KY

Streets/Roads

Old
Clark
Sta.
Rd.
Bridge
Replacement
2.3
M
E














720,000


40

Louisville

KY

Streets/Roads

Chenoweth
Run
Bridge
Replacements














775,000


50

Louisville

KY

Streets/Roads












3,000,000


180

Louisville

KY

Streets/Roads












2,000,000


200

Louisville

KY

Streets/Roads












4,000,000


400

Louisville

KY

Streets/Roads










10,000,000


1200

Louisville

KY

Transit

Extension
of
Air
Commerce
Drive:
construc3on
of
a
main
boulevard,
an
access
bridge
and
the
necessary
 u3li3es
to
sustain
commercial
and
light
industrial
development
at
the
Renaissance
Zone
South
Business
Park New
Sidewalks
Proposed
funding
would
allow
for
construc3on
of
approximately
100,000
linear
feet
of
new
 sidewalk
in
non‐CDBG
eligible
areas. Sidewalk/Curb
Replacement:
Proposed
funding
would
allow
for
replacement
of
approximately
100,000
linear
 feet
of
sidewalk/curb
in
non‐CDBG
eligible
areas. Street
Resurfacing:
Proposed
funding
would
allow
for
143
miles
of
roads
to
be
resurfaced
in
non‐CDBG
eligible
 areas
within
one
season,
which
is
approximately
8
months
out
of
the
year. KIPDA
Vanpool
Program
‐
20
Ticket
to
Ride
vehicles
to
promote
addi3onal
vanpooling
to
regional
employers














420,000


3

Louisville

KY

Transit














450,000


8

Louisville

KY

Transit














500,000


9

Louisville

KY

Transit












1,375,000


10

Union
Sta3on
Energy
Efficiency
Project
–
Replace
highly
inefficient
and
failing
chiller,
boiler,
system
controls,
 refurbish
fan
coil
units,
and
refurbish
windows
in
1890
landmark
building. Union
Sta3on
Baggage
Building
Renova3on
‐
Renovate
currently
uninhabitable
second
floor
of
historic
building
 adjacent
to
Union
Sta3on.
Includes
refurbishing
windows
and
doors,
adding
HVAC,
insula3on,
refurbish
slate
 and
architectural
metal
roofing,
an Replace
Deteriorated
Sidewalks
and
Curbs:
Improve
safety
and
accommodate
pedestrian
traffic
at
four
priority
 blocks
targe3ng
deteriorated
sidewalks
and
curbs
in
bad
condi3on
and
as
pedestrian
traffic
to
the
new
Arena
 increases.

The
poor
condi3ons
will

City

State

Program

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Transit

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Project
Descrip3on Park
Hill
Transit
Improvements
(economic
development)
–
Develop
a
Park
Hill‐University
of
Louisville
 circula3on
route
that
provides
befer
mobility
for
workers/residents/students
to
connect
to
jobs
and
the
 University
campus
with
possible
linkage
to
futur Broadway
Division
Bus
Storage
Building
Renova3on
–
Replace
57,000
s.f.
roof
system
with
green
roof,
replace
 failed
overhead
doors,
clean
and
paint
exterior
walls,
replace
electrical
panels,
ligh3ng,
repair
paving,
and
add
 fire
alarm
system. Park
Hill
At‐Grade
Rail
Crossing
Improvements:
Improve
safety
and
accommodate
car
and
truck
traffic
at
four
 crossings,
includes
protec3ve
lights
and
gates.

Project
helps
improve
access
to
Park
Hill
industrial
corridor TARC
Bus
Storage
Building
Solar
Roof
‐
Replace
30
year
old
built
up
roofing
on
144,000
sq.
b.
bus
storage
 building
at
Union
Sta3on
with
high
albedo
“white”
roof
and
80
kW
photovoltaic
system. Purchase
diesel
fuel
to
offset
increased
service
demand Riverwalk
Mul3‐modal
Facility
Reconstruc3on:
Project
involves
bank
stabiliza3on
along
Ohio
River
&
 reconstruc3on
of
mul3‐modal
facility
that
expands
access
to
neighborhoods
and
bus
services. Expand
Hybrid
Bus
Fleet
‐
Purchase
of
(20)
addi3onal
hybrid
buses
to
bring
fleet
total
to
32
for
expanded
 express
and
local
service.

Hybrid
buses
are
over
20%
more
fuel
efficient,
and
emit
30%
fewer
pollutants
than
 standard
diesel
buses. TARC
Maintenance
Annex
‐
Construct
Union
Sta3on
(plans
approved
&
ready
to
go)
annex
to
expand
and
 upgrade
maintenance
and
training
facili3es.

Project
includes,
green
roof,
bio‐swale,
grey
water
system,
LEED
 Silver
cer3fica3on
and
innova3ve
12
volt Intermodal
Transit
Center
–
Central:
This
project
involves
Louisville
Metro
Central
Business
District
intermodal
 transit
sta3on
one
facility

This
new
transit
center
will
provide
access
to
TARC
routes,
local
taxi,
bicycle
parking
 and
storage,
and
transit Intermodal
Transit
Center
–
Satellite:
This
project
involves
two
satellite
Louisville
Metro
intermodal
transit
 sta3ons.
New
transit
centers
will
provide
access
to
TARC
routes,
local
taxi,
bicycle
parking
and
storage,
and
 transit
oriented
retail
at
street Water
Quality
Lab
Informa3on
System:
Upgrade
exis3ng
water
quality
lab
informa3on
system
to
comply
with
 regulatory
repor3ng
and
future
drinking
water
regula3ons. Radio
and
Data
Communica3ons
System
Upgrade:
Upgrade
the
two‐way
radio
and
data
communica3on
system
 for
water
u3lity
and
emergency
opera3ons.

New
digital
system
will
link
to
MetroSafe
Emergency
Radio
 communica3ons
system.

Current
system
becomes
obs Water
System
Security
Access:
Upgrade
controlled
access
system
with
digital
video,
controlled
electronic
 access,
and
proximity
readers.

System
will
enhance
security
at
water
treatment
plants,
pumping
sta3ons,
 distribu3on
centers,
and
corporate
office.
 Chapeze
Road
–
Highway
245
Main
Extension:
Construct
2.8
miles
of
16‐inch
transmission
main
in
Chapeze
 Lane
from
I‐65
east
and
south
to
Highway
245,
and
along
Highway
145
to
Happy
Hollow
Road. Transylvania
Beach
Sewers:
Install
sewers
to
20
homes
currently
on
sep3c
tanks
along
Transylvania
Beach.
 Elimina3ng
sep3c
tanks
in
this
wellhead
protec3on
area
will
protect
Louisville's
drinking
water
supply
from
 source
water
contamina3on. Historic
Zorn
Pump
Sta3on
#1
Building
and
Site
Improvements:

Rehabilitate
the
exterior
of
the
historic
pump
 sta3on
and
construct
site
improvements
to
improve
drainage,
access,
parking. Highway
480
Regional
Water
Storage:
Construct
new
drinking
water
storage
tank
on
Highway
480
in
Bullif
 County
to
provide
regional
water
service
in
Bullif
and
Nelson
County. Regional
Water
Storage:
Construct
new
drinking
water
storage
tank
on
Highway
in
Bullif
County
to
provide
 regional
water
service
in
Bullif
and
Nelson
County Highway
245
Regional
Water
Supply:
Construct
3.6
miles
of
16
inch
transmission
main
to
provide
regional
 water
service
to
Bullif
and
Nelson
County Clean
and
Reline
Crescent
Hill
Raw
Water
Reservoirs
(north
and
south):
Remove
accumulated
river
sediment
 from
the
105
MG
raw
water
reservoirs
at
Crescent
Hill,
properly
dispose
of
sediments,
and
repair
synthe3c
 liner
once
completed Crescent
Hill
Sobening
Basin
Renova3on:
Rehabilitate
sobening
basins
at
Crescent
Hill
Water
Treatment
Plant
 to
comply
with
2012
drinking
water
regula3ons Crescent
Hill
Slate
Roof
Replacement:
Replace
slate
roof
on
100
year
old
Crescent
Hill
Pump
Sta3on Zorn
Pump
Sta3on
Power
System
Renova3on:
Replace
aging
13KV
and
480
Volt
power
system
at
Zorn
Pump
 Sta3on
#2
and
#3
to
improve
reliability
and
reduce
maintenance Interstate
65
Regional
Water
Supply,
Phase
I:
Construct
2.9
miles
of
24‐inch
transmission
main
from
Mud
Lane
 to
John
Harper
Highway
and
along
John
Harper
Highway
to
Preston
Highway. Interstate
65
Regional
Water
Supply,
Phase
II:
Construct
3.0
miles
of
24‐inch
transmission
main
along
the
 Preston
Highway
(Hwy
61)
from
John
Harper
Highway
to
the
Seflers
Point
elevated
storage
tank. Ft.
Knox/Hardin
County
Regional
Water
Supply:
Construct
3.2
miles
of
24
inch
transmission
main
to
supply
 wholesale
water
service
to
Ft
Knox
and
Hardin
County Water
Mains
Rehabilita3on:
Install
cathodic
protec3on
on
75
miles
of
water
distribu3on
main
(duc3le
and
cast
 iron)
to
extend
pipe
life
and
reduce
water
main
breaks. Interstate
265
Transmission
Supply:
2.8
miles
of
36‐inch
transmission
main Supply
Potable
Water
to
Unserved
Customers
in
Jefferson,
Bullif
and
Oldham
County:
Extend
7.1
miles
of
 water
main
to
customers
in
Bullif
and
Oldham
County
to
provide
unserved
customers
with
a
safe
reliable
 source
of
potable
water Interstate
65
Regional
Water
Supply,
Phase
III:
Construct
9.3
miles
of
16‐inch
transmission
main
from
Chapeze
 Lane
to
the
Bullif‐Hardin
County
Line.

Project
will
include
construc3on
of
a
new
5
MGD
booster
pump
sta3on. Water
Main
Replacement:
Replace
9.5
miles
of
water
main
to
improve
water
quality,
fire
hydrant
flow
and
 reduce
maintenance;
work
includes
replacement
of
the
water
main
in
the
Fincastle
neighborhood. Interstate
64
Regional
Water
Supply:
Construct
5.4
miles
of
36
inch
transmission
main
along
I‐64
from
Gene
 Snyder
Freeway
to
Shelby
County
Line
to
provide
regional
water
service
to
eastern
Jefferson
County
and
 western
Shelby
County. Billtown
Road
Interceptor:
This
project
consists
of
the
construc3on
of
approximately
12,000
linear‐feet
of
36‐ inch
gravity
sewer.
This
project
is
a
cri3cal
component
necessary
to
con3nue
to
allow
growth
and
enable
 development
previously
unavailable Champions
Park
Development:
a
design
that
captures
and
treats
onsite
water
runoff
from
surrounding
 redeveloped
roadways.

Funding
Required

Jobs












3,500,000


15












1,000,000


17












3,000,000


20












1,972,000


40












4,000,000


53












1,000,000


80










10,500,000


84












6,000,000


91












3,000,000


120












3,000,000


120












1,000,000


2














500,000


4














500,000


4












1,200,000


10












1,000,000


10












1,000,000


12












2,000,000


16












2,000,000


16












2,500,000


20












3,000,000


24












3,000,000


24












2,500,000


25












2,500,000


25












3,500,000


28












4,100,000


33












4,500,000


36












4,500,000


36












5,000,000


40












4,500,000


45












7,000,000


56












6,500,000


65










11,700,000


94












7,500,000


100












6,000,000


100

City

State

Program

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Louisville

KY

Water

Shelbyville

KY

Public
Safety

Shelbyville

KY

Water

Shelbyville

KY

Water

Alexandria


LA

CDBG

Alexandria


LA

CDBG

Alexandria


LA

CDBG

Alexandria


LA

Energy

Alexandria


LA

Public
Safety

Shinks
Branch
Pump
Sta3on
and
Force
Main:
This
project
consists
of
construc3ng
a
two
million
gallon
per
day
 pump
sta3on
and
approximately
24,000
liner‐feet
of
force
main
to
convey
wastewater
to
the
Cedar
Creek
 Wastewater
Treatment
Facility. Lead
Service
Line
Renewals:
Replace
and/or
rehabilitate
10,000
lead
service
lines
to
improve
water
quality
to
 homes
in
Jefferson
County West
County
Waste
Water
and
Treatment
Plant
Wet
Weather
Treatment
Facility:
provides
for
the
construc3on
 of
a
new
Wet
Weather
Treatment
Facility,
modifica3ons
to
the
new
exis3ng,
Grit
Handling
Building,
a
new
 aera3on
basin,
six
new
clarifiers,
two
new West
County
Waste
Water
and
Treatment
Plant
Pump
Sta3on
Improvements
and
Addi3ons:
The
scope
will
 provide
modifica3ons
to
the
Raw
Sewage
Pump
Sta3on
(RSPS),
a
new
Screening
Facility,
a
new
Wet
Weather
 Pump
Sta3on
(WWPS Hikes
Lane
Interceptor
Sewer:
One
of
a
series
of
large
diameter
interceptor
sewers
that
will
be
constructed
to
 relieve
basement
flooding
of
hundreds
of
homes
in
the
Beechwood
Village/
Hikes
Lane
areas
during
wet
 weather.
 Northern
Ditch
Interceptor
Sewer:
One
of
a
series
of
large
diameter
interceptor
sewers
that
will
be
constructed
 to
relieve
basement
flooding
of
hundreds
of
homes
in
the
Beechwood
Village/
Hikes
Lane
areas
during
wet
 weather.
 Western
Pumping
Sta3on
Improvement:
Will
fund
a
full
replacement
of
seven
pumps
and
revamp
electrical
 service
and
emergency
power
to
the
sta3on.
The
Western
Pumping
Sta3on
is
the
first
FPS
of
16
in
Jefferson
 County
to
be
called
into
service
 Zoo
Sewer
Repair
and
Improvements:
address
repairs
to
zoo
sewer
system
first
iden3fied
in
1999;
construct
an
 effluent
handling/treatment
system;
build
a
gray
water
recycling
facility

 Construc3on
of
Fire
Sta3on
Number
Three.

The
Fire
Sta3on
will
be
located
on
Warriors
Way,
between
two
 schools
in
the
Northwest
corner
of
the
city. Midland
Gravity
Sewer
Porject.

This
project
will
extend
gravity
sewers
into
the
Arlington/Ardore
Subdivision
 areas.

In
doing
so,
this
project
will
eliminate
73
failing
sep3c
tanks,
extend
service
for

429
furture
 development
residental
lots,
75
acres
o Shelby
County
Interstate
64
Regional
Water
Supply:
Construct
22.5
miles
of
24
inch
transmission
main,
10
MGD
 booster
pump
sta3on
and
1
MG
storage
tank
to
provide
regional
water
supplies
to
Shelbyville,
Shelby
County,
 Frankfort,
and
Franklin
County. Sidewalk
construc3on
on
Masonic
Drive
(US
165‐B)
from
Texas
Avenue
to
Lee
Street,
located
in
a
CDBG
target
 area.

Presently
no
sidewalks
exist.

This
corridor
houses
ball
parks,
the
zoo,
City
Park,
tennis
courts
and
other
 venues
for
children's
and
other
 Ditch
enclosure
and
sidewalk
construc3on
(single‐side
5'
walk
approximately
1600'
in
length)along
Enterprise
 Road,
a
CDBG
target
area,
to
improve
pedestrian
safety. Monroe
Street
sidewalk
improvements.
Monroe
Street
is
in
a
CDBG
target
area
and
is
used
by
a
large
number
 of
children
to
walk
to
a
neighborhood
elementary
school
and
a
junior
high
school.
Safety
for
pedestrians
would
 be
greatly
enhanced Energy
Retrofit
of
City
Hall
and
Consolidated
Compound
‐
energy
retrofit
for
2
major
City
owned
opera3onal
 facili3es. Fire
arms
training
simulator
for
training
police
offiers.

Project
Descrip3on

Alexandria


LA

Public
Safety

Police/fire
driving
simulator
for
training
of
fire
and
police
officers.














102,000


Alexandria


LA

Public
Safety














380,000


Alexandria


LA

Public
Safety

Purchase
ladder
truck
for
service
atFire
Sta3on
#%
to
address
an3cipated
commercial
growth
trends
in
western
 por3on
of
city. purchase
of
mobil
police
command
center
for
responding
to
emergency
situa3ons.

Alexandria


LA

Public
Safety

Alexandria


LA

Public
Safety

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Streets/Roads

Alexandria


LA

Transit

Alexandria


LA

Transit

Alexandria


LA

Water

Alexandria


LA

Water

Alexandria


LA

Water

Renova3on
to
Fire
Sta3on
#4,
on
Masonic
Drive
to
inprove
fire
protec3on
for
the
district
and
further
 implementa3on
of
the
fire
sta3on
reposi3oning
study. Construc3on
of
the
I‐49
corridor
through
Alexandria
seriously
disrupted
fire
response
3me.

The
city
undertook
 a
fire
sta3on
reposi3oning
study
to
assess
the
needs
of
fire
response.

The
study
concluded
the
need
to
 relocate
and
construct
4
new
fire
st City
Park
Historical
Bridge
Preserva3on;
par3al
reconstruc3on
and
preserva3on
of
two
historical
bridges
on
 North
City
Park
Blvd. Versailles
Boulevard,
Phase
2,
Package
5
‐
construc3on
of
new
three‐lane
concrete
roadway
with
subsurface
 drainage
and
u3li3es
(gas,
water
and
sewer);
approximate
length
of
1600' Jackson
Street
(LA
1208‐3)
and
Horseshoe
Drive
Intersec3on
Improvements;
reconstruc3on
of
exis3ng
 intersec3on
for
improved
capacity
and
safety Masonic
Drive
(US
165)
and
Horseshoe
Drive
Intersec3on
Improvements;
reconstruc3on
of
exis3ng
 intersec3on
for
improved
capacity
and
safety Culpepper
Road;
Masonic
Drive
to
North
Boulevard‐
reconstruc3on
of
an
exis3ng
20'
asphal3c
concrete
road
 with
open
ditches
to
two‐lane
concrete
roadway
with
subsurface
drainage Culpepper
Road;
North
Boulevard
to
MacArthur
Drive;
reconstruc3on
of
an
exis3ng
20'
asphal3c
concrete
road
 with
open
ditches
to
two‐lane
concrete
roadway
with
subsurface
drainage Lincoln
Road
Street
and
Drainage
Improvements
‐
reconstruc3on
of
exis3ng
22'
asphal3c
concrete
roadway
 with
open
ditches
to
28'
concrete
roadway
with
subsurface
drainage
approximate
length
of
1800
feet;
 replacement
of
water,
gas
and
sewer
u3li3es Versailles
Boulevard,
Phase
2,
Package
4
‐
construc3on
of
new
three‐lane
concrete
roadway
with
subsurface
 drainage
and
u3li3es
(gas,
water
and
sewer);
approximate
length
of
5300' Horseshoe
Drive;
Masonic
Drive
to
Horseshoe
‐
reconstruc3on
of
exis3ng
two‐lane
asphal3c
concrete
roadway
 with
open
ditches
to
three‐lane
concrete
roadway
with
subsurface
drainage Acquisi3on
of
property
on
Bolton
Ave.
in
central
Alexandria
for
construc3on
of
new
bus
transfer
sta3on
to
 improve
public
transporta3on. Purchase
of
4
new
26
passenger
buses
to
reduce
fuel
cost
and
improve
nighqme
bus
service. Water
Well
Addi3ons
and
Rehabilita3ons
‐
the
bulk
of
the
City's
water
wells
were
installed
in
the
late
1960's.

 New
wells
need
to
be
drilled
and
exis3ng
wells
need
rehabilita3on
or
replacement.

In
addi3on,
the
City
 desperately
needs
more
water
produ Alexandria
West
Treatment
Plant
‐
construc3on
of
22
MGD
wastewater
plant
to
relieve
exis3ng
treatment
and
 faciliate
development
and
growth
in
west
Alexandria. Hamilton
Street
Pump
Sta3on
‐
2MG
storage
tank
located
at
Hamilton
Street
pump
sta3on
located
at
505
 Monroe
Street.

The
exis3ng
pumps
in
this
sta3on
are
60
plus
years
old
surplus
from
Camp
Livingston.

Funding
Required

Jobs










10,000,000


100










20,000,000


200










37,300,000


225










35,040,000


250












8,000,000


300












7,000,000


300










13,000,000


300










13,000,000


300














600,000


6












1,815,000


15










39,600,000


317














575,000


6














750,000


8














600,000


8












5,000,000


4
















84,647















550,000
 










2,300,000


25










12,000,000


60














300,000


5












1,250,000


10












3,500,000


20












3,500,000


20












6,000,000


30












6,000,000


30












2,500,000


30












7,014,000


35












8,000,000


50














750,000
 












720,000











12,000,000


12










67,000,000


15














500,000


15

City

State

Program

Alexandria


LA

Water

Alexandria


LA

Water

Baton
Rouge

LA

Airport

Downtown
Water
Main
Replacement
‐
por3ons
of
our
original
water
system
downtown
date
to
the
late
1800's
 or
early
1900's.

A
complete
reconstruc3on
of
the
downtown
water
infrastrucutr
is
needed. Test
and
Collector
Well
at
Hamilton
Street
‐
2MG
storage
tank
built
in
the
1992
needs
water
wells
to
fill
and
 operate
properly. Emergency
Hurricane
Generator,
Airport
Terminal
Building,
4.3
Mega
Wafs







Project
Descrip3on

Funding
Required

Jobs

Baton
Rouge

LA

Airport

Aircrab
Rescue
Fire
Figh3ng
Vehicle














































Baton
Rouge

LA

Airport

Relocate
Entergy
Power
Line
at
Harding
Boulevard
(Obstruc3on
&
Safety
to
Runway
4L
Approach)








Baton
Rouge

LA

Airport

Baton
Rouge

LA

Airport

Runway
4R/22L
Taxiway
E
&
G
Reconstruc3on




































8,200,000


20

Baton
Rouge

LA

Airport

Runway
22R
&
4L
Safety
Area
Perimeter
Road,
405
Study
and
Environmental
Assessment
for
4L/22R























































































 










4,660,000
 30

Baton
Rouge

LA

Airport

Aircrab
Rescue
Fire
Figh3ng
Building
Rehabilita3on
and
Expansion















3,000,000


40

Baton
Rouge

LA

Airport

Complete
Airfield
Drainage
Improvements









































5,300,000


40

Baton
Rouge

LA

Airport

Taxiway
“F”
Reconstruc3on
and
Extension






































16,300,000


50

Baton
Rouge

LA

CDBG

Traffic
Division
Office
Space
Expansion
at
Bon
Carre
Business
Center














150,000


2

Baton
Rouge

LA

CDBG

Misdemeanor
Inves3ga3on
Room
Addi3on
and
Hurricane
Damage
Repair














200,000


3

Baton
Rouge

LA

CDBG

Mobile
Police
Video
and
Narco3cs
office
space
and
vehicle
work
area














300,000


4

Baton
Rouge

LA

CDBG

4th
District
Police
Sta3on
Replacement












1,900,000


15

Baton
Rouge

LA

CDBG

Downtown
Wayfinding
Signage
and
Visitors
Amenity
Plan












2,000,000


16

Baton
Rouge

LA

CDBG












2,000,000


16

Baton
Rouge

LA

CDBG












2,000,000


16

Baton
Rouge

LA

CDBG












2,500,000


27

Baton
Rouge

LA

CDBG












4,000,000


31

Baton
Rouge

LA

CDBG

Baton
Rouge

LA

CDBG

Thomas
Delpit
pedestrian
and
street
scape
enhancements
to
service
the
LSB
Community
Center,
YMCA,Polk
 Elementary
and
other
public
facili3es Washington
Street
pedestrian
and
street
scape
enhancements
to
service
the
Butler
Community
Center,
and
 City
Park Government
Street
and
Florida
Street
Enhancements
with
improved
street
lights,
cross
walks
and
other
ADA
 compliant
modifica3ons North
Boulevard
Town
Square
Implementa3on
to
link
civil
and
cultural
assets
including;
Arts
and
Science
 Museum,
Old
State
Capitol,
Downtown
Government,
Downtown
Library,
Arts
Center,
Mississippi
River,
etc. Construct
North
Side
Railroad
Spur
at
Airport
for
North
End
Development
of
Air
Industrial
Park.
The
only
 lacking
mode
of
transporta3on
for
the
 Conven3on
Center
Expansion
and
Renova3on

Baton
Rouge

LA

CDBG

Baton
Rouge

LA

Baton
Rouge










18,000,000


22












1,500,000


25












4,000,000


5














700,000


10












3,000,000


10

Entergy
Transmission
Tower
Reloca3on
on
Plank
Road
(Obstruc3on
&
Safety
to
the










Runway
22
Approach)






















 










9,000,000


20










16,400,000


35










16,000,000


125










26,200,000


205

CDBG

Fire
Sta3on
Replacements
for
Sta3ons:
No.
4,
No.
8,
No.
9,
No.
10,
No.
13,
No.
14,
No.
15,
and
No.
19
and
 Renova3ons
to
No.
12
along
with
Training
Tower
Replace Downtown
Parking
Garage
Replacements
and
Expansion










69,000,000


600

LA

CDBG

DeSoto
Park
Development
as
part
of
both
the
Riverfront
Master
Plan
and
Capitol
Park
Master
Plan










55,000,000


1000

Baton
Rouge

LA

CDBG

Old
City
Dock
Stabiliza3on
and
Redevelopment










60,000,000


1000

Baton
Rouge

LA

CDBG

Baton
Rouge
River
Center
Expansion











76,000,000


2000

Baton
Rouge

LA

Energy

School
zone
crossing
flashers
that
are
LED
and
solar
powered
(160
crossings)












1,300,000


5

Baton
Rouge

LA

Streets/Roads

Bridge
Replacement
East
Grant
Street
over
Corpora3on
Canal

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Baton
Rouge














600,000


6

Bridge
Replacement
Sharp
Road
over
Jones
Creek












1,500,000


16

Pecue
Lane
Re‐alignment
at
Perkins
Rd
(LA
427)‐Capacity
and
safety
improvements
to
re‐align
an
offset
 intersec3on
with
turn
lanes
and
new
traffic
signal Air
Cargo
Building
Access
Road


































































1,500,000


16












8,000,000


20

Major
Arterial
Signal
Inter‐Connect
conversion
of
hard
wire
to
fiber
on
College
Dr,
Sherwood
Forest
Blvd,
and
 Highland
Rd,
and
Nicholson
Dr Bridge
Replacement
Frenchtown
Road
over
Beaver
Bayou












2,000,000


21












3,200,000


34












3,500,000


37

Streets/Roads

Foster‐Government
Street(LA
73)
Intersec3on
Improvement‐Major
intersec3on
improvements
including
new
 turn
lanes
in
all
direc3ons
and
new
signal
system
on
hwy
leading
to
Baton
Rouge
Community
College North
End
Airport
Industrial
Park
Roads










































15,000,000


45

LA

Streets/Roads

Coursey
Boulevard
Pavement
Rehabilita3on
(US
Hwy
61
to
Jones
Creek
Rd)












5,000,000


53

Baton
Rouge

LA

Streets/Roads












5,000,000


53

Baton
Rouge

LA

Streets/Roads

Perkins
Road(LA
427)
at
Stanford/Acadian
Intersec3on
Improvement‐Major
intersec3on
improvements
 including
dual
turn
lanes
in
all
direc3ons
and
new
signal
system
on
hwy
connec3ng
LSU
with
I‐10 Baton
Rouge
Computerized
Signal
Synchroniza3on
Project
Phase
5A












6,500,000


69

Baton
Rouge

LA

Streets/Roads

South
Plank
Road
Reloca3on









(Obstruc3on
and
Safety
Runway
31)

















































22,100,000


70

Baton
Rouge

LA

Streets/Roads

Pavement
Rehabilita3on
and
Replacement
Program
Phase
09/01










10,000,000


106

Baton
Rouge

LA

Streets/Roads

Pavement
Rehabilita3on
and
Replacement
Program
Phase
09/02










10,000,000


106

Baton
Rouge

LA

Streets/Roads










12,300,000


131

Baton
Rouge

LA

Streets/Roads










12,300,000


131

Baton
Rouge

LA

Streets/Roads










14,500,000


154

Baton
Rouge

LA

Streets/Roads










15,000,000


160

Baton
Rouge

LA

Streets/Roads










15,200,000


162

Baton
Rouge

LA

Streets/Roads

Central
Thruway
Phase
II‐Provides
new
4‐lane
divided
hwy
that
is
part
of
our
transporta3on
improvement
 program
and
provides
needed
flood
evacua3on
route,
including
3
new
bridges
over
Beaver
Bayou
and
 intersec3on
improvements
at
state
route
LA
37 Jones
Creek
Road
Improvements
Segment
3‐Capacity
and
safety
improvements
to
upgrade
func3onally
 obsolete
2
lane
open
ditch
roadway
to
a
4
lane
divided
curb
and
gufer
hwy,
including
a
bridge
replacement
 over
Jones
Creek Comite
Drive
Improvements‐
Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2
lane
open
 ditch
roadway
with
a
2
lane
curb
and
gufer
street
with
turn
lanes
and
sidewalks Baton
Rouge
Computerized
Signal
Synchroniza3on
Project
Future
Phase
Early
Implementa3on

(60
 Intersec3ons) Highland
Road(LA
42)
Improvements‐Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2
 lane
open
ditch
roadway
to
a
4
lane
divided
hwy,
including
(2)
bridge
replacements
and
improvements
to
an
at
 grade
RR
crossing
(KCSRR) Staring
Lane
Extension‐Capacity
and
connec3vity
with
a
4
lane
divided
curb
and
gufer
hwy
with
sound
walls,
 including
a
bridge
over
Bayou
Fountain,
a
66"
sanitary
sewer
upgrade,
and
an
intersec3on
improvement
with
 Burbank
Dr
(LA
42)










16,000,000


170

City

State

Program

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Streets/Roads

Baton
Rouge

LA

Transit

South
Harrell's
Ferry
Road
Improvements‐Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
 2
lane
open
ditch
roadway
to
a
4
lane
curb
and
gufer
hwy
with
turn
lanes
and
sidewalks,
including
a
bridge
 replacement
over
Jones
Creek Sullivan
Road
Improvements‐
Capacity
and
safety
improvements
to
upgrade
func3onally
obsolete
2
lane
open
 ditch
roadway
with
a
4
lane
divided
hwy
and
to
provide
connec3vity
with
adjoining
Parish
and
I‐12 Central
Thruway
Phase
I‐Provides
new
4‐lane
divided
hwy
that
is
part
of
our
transporta3on
improvement
 program
and
provides
needed
flood
evacua3on
route,
including
RR
overpass
and
intersec3on
improvements
at
 US
Hwy
190 GPS
Equipment
and
Tracking
system
for
en3re
Transit
Authority
Fleet

Project
Descrip3on

Baton
Rouge

LA

Transit

Baton
Rouge

LA

Baton
Rouge

LA

Baton
Rouge

Funding
Required

Jobs










18,000,000


191










18,000,000


191










18,300,000


195














400,000


3

Construct
new
Downtown
Intermodal
Transit
Shelter












1,000,000


10

Transit

Dynamic
message
signs
for
traveler
informa3on
and
assistance












3,000,000


12

Water

North
Waste
Water
Treatment
Plant
Odor
Control
and
Liquid
Phase
Implementa3on












4,000,000


16

LA

Water

Aster
Chimes
Drainage
Impovements
Phase
II
(LSU
to
W.
Roosevelt)












1,500,000


23

Baton
Rouge

LA

Water












3,600,000


29

Baton
Rouge

LA

Water












4,000,000


33

Baton
Rouge

LA

Water

Lovef
Road
Area
Mul3ple
Sanitary
Sewer
Pump
Sta3on
Upgrades
which
are
part
of
our
SSO
elimina3on
 program Parish
Wide
Sanitary
Sewer
Physical
Inspec3on,
CCTV,

and
Cleaning.

This
is
a
one
year
contract
with
the
 op3on
to
renew
2
addi3onal
yrs
with
the
contract
value
set
at
$2
million
per
year Northwest
Airport
Box
Culvert






to
Allow
for
Development
(Monte
Sano
Bayou)























10,000,000


35

Baton
Rouge

LA

Water

West
Side
Box
Culvert
to
Increase
Airport
Public
Parking













































































11,000,000


40

Baton
Rouge

LA

Water












6,000,000


49

Baton
Rouge

LA

Water












6,000,000


49

Baton
Rouge

LA

Water

Oak
Villa
Blvd‐Choctaw

Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO
 elimina3on
program Staring
Lane‐Boone
Dr
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO
elimina3on
 program Foster‐Hooper
Road
Area
Sanitary
Sewer
Upgrades
which
is
part
of
our
SSO
elimina3on
program












8,500,000


69

Baton
Rouge

LA

Water

Pump
Sta3on
136
Area

Sanitary
Sewer
Upgrades
which
is
part
of
our
SSO
elimina3on
program












8,500,000


69

Baton
Rouge

LA

Water












9,000,000


73

Baton
Rouge

LA

Water












9,000,000


73

Baton
Rouge

LA

Water

Burbank
Rd‐Gardere
Lane
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO
 elimina3on
program Scotland
Ave‐Progress
Rd
Area
Sanitary
Sewer
Comprehensive
Rehabilita3on
which
is
part
of
our
SSO
 elimina3on
program Industriplex
Area
Sanitary
Sewer
Facility
Upgrades
which
is
part
of
our
SSO
elimina3on
program










10,200,000


83

Baton
Rouge

LA

Water










42,000,000


341

Bossier
City

LA

CDBG

South
Waste
Water
Treatment
Plant
Dry
Weather
Flow
Immediate
Ac3on
Improvements‐Trickling
Filter,
re‐ circula3on
pump
sta3on,
and
sludge
handling
improvements Scof
Street

Area
Sewer
Rehab












2,000,000


25

Bossier
City

LA

CDBG

Barksdale
Annex
Street
Rehab












1,500,000


100

Bossier
City

LA

CDBG

Downtown
Bossier
Drainage
Improvements












1,500,000


100

Bossier
City

LA

CDBG

Downtown
Bossier
Street
Rehab












1,500,000


100

Bossier
City

LA

CDBG

Mitchell
Park
Rehab












2,100,000


100

Bossier
City

LA

CDBG

Sidewalk
Rehab












1,500,000


100

Bossier
City

LA

Streets/Roads

ART‐
Traffic
Street
Widening












9,000,000


150

Bossier
City

LA

Streets/Roads

Airline
Drive
Railroad
Underpass










18,500,000


200

Bossier
City

LA

Streets/Roads

ART
‐
South










10,000,000


200

Bossier
City

LA

Streets/Roads

Swan
Lake
Road












9,500,000


200

Bossier
City

LA

Water

Red
River
Treatment
Plant
Rehab












1,000,000


25

Bossier
City

LA

Water

Sewer
Rehab












2,000,000


25

Bossier
City

LA

Water

Lab
Building
&
Rehab












1,000,000


50

Bossier
City

LA

Water

Drainage
Rehab












1,000,000


100

Bossier
City

LA

Water

Bossier
City
Sewer
Treatment
Facility










50,000,000


500

Bossier
City

LA

Water

Bossier
City
Water
Purifica3on
Facility










80,000,000


500

Monroe

LA

Airport

Regional
Airport
Terminal










31,000,000


Monroe

LA

Housing

Unsafe
Structures
Program












1,500,000


Monroe

LA

Housing

Reroof
city
buildings












1,500,000


10

Monroe

LA

Housing

clearance
and
demoli3on
of
300
unsafe
structures












1,150,000


100

Monroe

LA

Public
Safety

Biological
Radioac3ve
Nuclear
Explosive
Incident
Response
Vehicle

Monroe

LA

Public
Safety

Chemical
Biological
Radioac3ve
Nuclear
Explosive
Incident
Response
Vehicle

Monroe

LA

Public
Safety

rennovate
two
fire
sta3ons

Monroe

LA

Streets/Roads

Air
Industrial
Park
Rail
Spur

LA

Streets/Roads

Air
Industrial
Park
Service
Roads Downtown
Parking












6,150,000


Monroe Monroe

LA

Streets/Roads

Evangeline
Street
Drainage












1,412,000


Monroe

LA

Streets/Roads

Forsythe
Extension
Corridor
Preserva3on












1,800,000


Monroe

LA

Streets/Roads

I‐20
Frontage
Road
at
Millhaven












2,500,000


Monroe

LA

Streets/Roads

Tower
Armand
Right‐of‐way












2,100,000


Monroe

LA

Transit

bike
trails














175,000


Monroe

LA

Water

Relocate
Sewage
Lib
Sta3on,
Garref
Road
















90,000


Monroe

LA

Water

Remote
Water
Booster
Sta3ons












2,140,000


Monroe

LA

Water

Water
Main
Loop
on
Hadley
Street












1,511,000


New
Iberia

LA

CDBG

Housing
Handicap
Accessibility
Improvements














500,000


10

New
Iberia

LA

CDBG

St.
Mary
St.
Sewer
Rehab














465,000


12

New
Iberia

LA

CDBG

Basin
B
Wastewater
Collec3ons














965,000


15

New
Iberia

LA

CDBG

Field
&
Dale
St.
Sewer
Rehab














645,000


15

New
Iberia

LA

CDBG

Santa
Ines
Wastewater
Project














700,000


15














275,000
 












260,413


0












4,500,000


25












1,750,000


5

City

State

Program

New
Iberia

LA

CDBG

Municipal
Street
Improvements

Project
Descrip3on

Funding
Required 










2,006,000


Jobs 20

New
Iberia

LA

CDBG

New
Iberia

LA

CDBG

Hopkins
Street
Improvements












1,000,000


25

Sewer
Rerou3ng
Project












2,100,000


New
Iberia

LA

25

CDBG

Mul3‐use
Conference
Center










23,000,000


New
Orleans

75

LA

Airport












2,500,000


61

New
Orleans

LA

Airport

U3li3es
Phase
of
Concourse
D
Expansion
‐
New
HVAC
system
to
provide
addi3onal
capacity
for
increased
floor
 space New
Airfield
Vault
‐
replace
exis3ng
electrical
switchgear
vault
for
airfield












3,500,000


87

New
Orleans

LA

Airport

Concourse
D
Apron
‐
reloca3on
of
taxilanes
to
accomodate
addi3onal
carrier
traffic












5,000,000


121

New
Orleans

LA

Airport

Aberdeen
Street
Improvements
‐
upgrade
of
exis3ng
general
avia3on
access
road












6,000,000


149

New
Orleans

LA

Airport

West
Terminal
Roadway
‐
realignment
of
terminal
traffic
connec3ng
new
passenger
facili3es












8,500,000


211

New
Orleans

LA

Airport

West
Terminal
Apron
‐
Expansion
Airfield
Apron
to
support
aircrab
opera3ons










10,000,000


242

New
Orleans

LA

Airport

Facility
Improvement
Program
‐
upgrades
and
renova3on
of
the
Airport
facili3es










10,520,150


261

New
Orleans

LA

Airport

Taxiway
Golf
East
Extension
‐
extend
exis3ng
taxiway
to
connect
with
north/south
runway










10,601,755


263

New
Orleans

LA

Airport

U3lity
Building
‐
Permanent
storm‐proof
facility
for
backup
power










11,000,000


273

New
Orleans

LA

Airport

New
Aircrab
Rescue
and
Fire
Figh3ng
(ARFF)
Sta3on
‐
construc3on
of
new
emergency
response
facility










12,000,000


298

New
Orleans

LA

Airport

Terminal
Apron
Rehabilita3on
‐
Phases
I
&
II
‐
restore
air
carrier
apron
surrounding
terminal
and
concourses










16,536,287


410

New
Orleans

LA

Airport

West
Annex
Gates
and
Terminal
Expansion
‐
constrc3on
of
6
new
gates
to
replaced
aging
facility










34,000,000


844

New
Orleans

LA

Airport

West
Terminal
Expansion
‐
Expansion
of
passenger
facili3es
including
addi3onal
gates
and
ameni3es










34,000,000


844

New
Orleans

LA

Airport

Expansion
of
Concourse
D
‐
6
addi3onal
gates
and
reconfigura3on
of
taxiway










42,451,830


1053

New
Orleans

LA

Amtrak












3,400,000


New
Orleans

LA

Amtrak

Acquisi3on
and
Retrofit
of
Greyhound
Baggage
Express/Dormitory
Building
for
City/Homeland
Security
 Emergency
Center Union
Passenger
Terminal
Asbestos
Abatement/ADA
Improvements
and
Upgrades

New
Orleans

LA

Amtrak

Union
Passenger
Terminal
New
Central
Plant












4,120,000


New
Orleans

LA

Amtrak

Union
Passenger
Terminal
New
Commissary
Building
for
AMTRAK












1,500,000


New
Orleans

LA

Streets/Roads

Earhart
Boulevard
(Hamilton
to
Fern)












7,500,000


New
Orleans

LA

Streets/Roads

Fleur
D'
Lis
Phase
2












9,000,000


New
Orleans

LA

Streets/Roads

Lakefront/Holy
Cross
Signals












3,000,000


New
Orleans

LA

Streets/Roads

Robert
E.
Lee
(Praf
to
Paris)












3,000,000


New
Orleans

LA

Streets/Roads

Robert
E.
Lee
Bridge
at
London
Avenue












6,000,000


New
Orleans

LA

Streets/Roads

St.
Charles
Avenue
(Calliope
to
Napoleon)












5,000,000


New
Orleans

LA

Streets/Roads

Woodland
(DeGaulle
to
Tullis)












5,500,000


New
Orleans

LA

Transit

10
Ton
Port‐A‐Power
Machine

New
Orleans

LA

Transit

100
Veloway
Bike
Program
bikes

New
Orleans

LA

Transit

25HP
NorthStar
2Gun
Hot
Water
Pressure
Washer
Trailer

New
Orleans

LA

Transit

30
E‐Z
buses












2,445,000


New
Orleans

LA

Transit

350
Transit
Shelters












2,800,000


New
Orleans

LA

Transit

9
transit
Police
Replacement
Vehicles














279,000


New
Orleans

LA

Transit

ADA
Voice
Annunciator
Equipment














680,000


New
Orleans

LA

Transit

Auto‐Cad
Control
System
for
Plasma
Cufer

New
Orleans

LA

Transit

BRT
buses
‐
10
ar3culated

New
Orleans

LA

Transit

Charging
System
Test
Equipment

New
Orleans

LA

Transit

Diagnos3c
computer
system
and
sobware

New
Orleans

LA

Transit

Diesel
Injector
Cleaner

New
Orleans

LA

Transit

Disc
Drum
Lathe
and
Equipment

New
Orleans

LA

Transit

EGR
Cleaner
for
6.0
Engine

New
Orleans

LA

Transit

Electronic
front
end
alignment
machine
















55,000


New
Orleans

LA

Transit

Engine
and
Transporta3on
Training
Module
for
Cummins
ISL
















45,000


New
Orleans

LA

Transit

Engine
Flush
Machine
and
Afachments
















15,000


New
Orleans

LA

Transit

Ford
IDS
System
















10,400


New
Orleans

LA

Transit

Four
Post
Computer
Alignment
Machine
















40,000


New
Orleans

LA

Transit

Gas
Forge
















20,000


New
Orleans

LA

Transit

Gas
Injector
Cleaner

New
Orleans

LA

Transit

Hotwash
cleaning
sta3on

New
Orleans

LA

Transit

HVAC
Flush
System

New
Orleans

LA

Transit

Landall
Truck
and
Trailer














160,000


New
Orleans

LA

Transit

Miscellaneous
Transit
Maintenance
Equipment














577,098


New
Orleans

LA

Transit

Nitrogen
infla3on
system
















30,000


New
Orleans

LA

Transit

Paint
Shaker

New
Orleans

LA

Transit

Paratransit
Mobile
Date
Terminal
(MDT)














200,000


New
Orleans

LA

Transit

Preven3ve
Maintenance
‐
fuel,
parts,
etc.










10,000,000


New
Orleans

LA

Transit

Push
Motor
and
Afachments
















62,798


New
Orleans

LA

Transit

Simmons
Wheel
Borer,
41"
table
with
5
1/2"
to
6"
wheel
bore














490,000


New
Orleans

LA

Transit

Spot
welder
and
Heavy
duty
Brake
Press

New
Orleans

LA

Transit

Street
Repair
at
Eastern
New
Orleans
Facility

New
Orleans

LA

Transit

Swing
Beam
Shear
















90,000


New
Orleans

LA

Transit

Thermo
King
Self
Contained
Module
















26,000


New
Orleans

LA

Transit

Transmission
Flush
Machine

New
Orleans

LA

Transit

Transmission
Flush
Machine
and
Afachments
















12,000


New
Orleans

LA

Transit

Upgrade
ITS
‐
Wireless
and
"Blue
Cloud"














151,348


New
Orleans

LA

Transit

Wheel
Borer
Equipment














490,000













1,050,000





















800
 










2,500,000
 














11,000

















75,000
 










7,500,000
 















2,500
 














24,800
 















2,200
 














10,500
 















2,500


















1,500
 














20,000
 















1,800


















2,000















250,000
 










1,500,000


















6,300


City

State

Program

New
Orleans

LA

Water

Gen.
DeGaulle
Pump
Sta3on
Retrofit

Project
Descrip3on

New
Orleans

LA

Water

Filter
Rehabilita3on
‐
replacement,
cleaning
and
maintenance
for
four
to
six
filters












3,000,000


18

New
Orleans

LA

Water

Sodium
Hypochlorite
Storage
and
Feed
Facility
‐
drinking
water
purifica3on












3,300,000


18

New
Orleans

LA

Water












4,990,000


26

New
Orleans

LA

Water

Co‐Genera3on
of
Electricity
‐
design/build
one
1,000
gross/950
net
KW
organic
Rankine
cycle
turbine
and
 ancillary
equipment New
Sludge
Line
to
the
River
‐
provide
separate,
redundant
discharge
line
to
the
Mississippi
River












6,200,000


36

Shreveport

LA

Airport

Regional
Airport
Overlay
Exis3ng
Streets
and
Add
Addi3onal
Street
Ligh3ng












1,000,000


10

Shreveport

LA

Airport

20
Addi3onal
T‐Hangars












1,500,000


15

Shreveport

LA

Airport

Airfield
Perimeter
Road
at
Downtown
Airport












3,000,000


30

Shreveport

LA

Airport

Water
and
Sewerage
Systems
for
Downtown
Airport












3,500,000


35

Shreveport

LA

Airport

Addi3onal
Aircrab
Parking
Apron
Southeast
Quadrant












5,000,000


50

Shreveport

LA

Airport

Airfield
Perimeter
Road
at
Regional
Airport












5,000,000


50

Shreveport

LA

Airport

Fiber
Op3cs
for
Regional
and
Downtown
Airports












5,000,000


50

Shreveport

LA

Airport

Design
and
Construc3on
of
the
Infrastructure
for
West
Cargo
Area,
Including
Streets
and
U3li3es












6,000,000


60

Shreveport

LA

Airport

Hollywood
Avenue
Reconstruc3on
for
Access
to
the
New
Cargo
Area












6,000,000


60

Shreveport

LA

Airport

Alterna3ve
Energy
Sources
for
Regional
and
Downtown
Airports










10,000,000


100

Shreveport

LA

Airport

Auxiliary
Runway
Southeast
Quadrant










10,000,000


100

Shreveport

LA

Airport

Energy
Efficient
Upgrades
for
Regional
and
Downtown
Airports










10,000,000


100

Shreveport

LA

Airport

Reloca3on
of
Air
Traffic
Control
Tower
at
Regional
Airport










10,000,000


100

Shreveport

LA

Airport

Environmental
Upgrades

for
Regional
and
Downtown
Airports











15,000,000


150

Shreveport

LA

Airport

Reloca3on
of
RAPCON
from
Barksdale
Air
Force
Base
to
Regional
Airport










15,000,000


150

Shreveport

LA

Airport

Regional
Airport
Runway
Extension
to
10,000
feet,
to
Include
tunneling
under
70th
Street
and
the
Railroad










50,000,000


500

Shreveport

LA

Amtrak

Marshall,
Texas
to
Shreveport,
LA











90,000,000


900

Shreveport

LA

CDBG

A.C.
Steere
Restrooms
to
serve
ADA‐accessible
park














200,000


2

Shreveport

LA

CDBG

Demoli3on
of
Unsafe
Housing
in
CDBG‐eligible
areas














500,000


5

Shreveport

LA

CDBG

Neighborhood
Business
Service
Center














500,000


5

Shreveport

LA

CDBG

Business
and
Arts
Historic
Project














800,000


8

Shreveport

LA

CDBG

Concordia
Place
Infrastructure
improvements














950,000


10

Shreveport

LA

CDBG

The
Oakland
Street
Historic
Preserva3on
Project












1,000,000


10

Shreveport

LA

CDBG

Jewell
Outreach
Center
No.
2
(transi3onal
housing
facility)












1,200,000


12

Shreveport

LA

CDBG

The
Film
Training
Center












1,500,000


15

Shreveport

LA

CDBG

The
Shreveport
Manchester
Bidwell
Entrepreneurial
Workforce
Training
Center












1,800,000


18

Shreveport

LA

CDBG

George
P.
Hendrix
Mul3‐Purpose
Center,
conversion
of
school
building












2,000,000


20

Shreveport

LA

CDBG

Business
Development
Revolving
Loan
Fund












3,000,000


30

Shreveport

LA

CDBG












5,000,000


50

Shreveport

LA

CDBG












5,000,000


50

Shreveport

LA

CDBG

Cargill
Sports
Complex,
renovate
regional
outdoor
sports
complex
for
sobball,
baseball,
and
soccer,
including
 ADA‐compliant
renova3ons Golf
Course
Renova3ons,
including
greens,
tees,
paths,
ligh3ng,
drainage,
irriga3on,
landscaping,
and
ADA‐ Compliant
renova3ons Paul
Lynch
Park
Development,
infrastructure,
drives,
parking,
athle3c
facili3es,
and
playground
development












5,000,000


50

Shreveport

LA

CDBG












5,000,000


50

Shreveport

LA

CDBG












6,000,000


60

Shreveport

LA

CDBG

Renova3ons
to
Fairgrounds
Field,
including
ligh3ng,
family‐area
improvements,
and
improvements
to
 concession
stands,
sea3ng,
and
ADA‐compliant
improvements Construct
Three
Aqua3cs
Facili3es
in
CDBG‐eligible
neighborhoods,
including
Olympic
pool,
waterslide,
water
 playground,
bathhouse,
and
other
site
improvements Riverview
Facility
Renova3ons,
including
energy
upgrades,
ADA‐compliant
improvements












6,000,000


60

Shreveport

LA

CDBG

Therapeu3c
Recrea3on
Center
Development,
including
indoor
therapeu3c
pool












6,000,000


60

Shreveport

LA

CDBG

Neighborhood
Park
Improvements,
includes
path
overlays,
tree
plan3ng,
and
other
outdoor
recrea3on












7,000,000


70

Shreveport

LA

CDBG

Community
Center
Development,
build
two
new
community
centers
in
CDBG‐eligible
neighborhoods










10,000,000


100

Shreveport

LA

Energy

Air
Quality
Modeling
Program














500,000


5

Shreveport

LA

Energy

Sprague
Street
Streetscape,
pedestrian
walkways,
ligh3ng,
landscaping














600,000


6

Shreveport

LA

Energy












2,000,000


20

Shreveport

LA

Energy












2,500,000


25

Shreveport

LA

Energy












3,000,000


30

Shreveport

LA

Energy

Barnwell
Center
Conservatory,
renovate
conservatory,
use
for
green
educa3on,
retrofit
with
energy‐efficient
 systems
and
controls,
ADA
upgrades Municipal
Auditorium,
including
energy‐efficient
ligh3ng,
HVAC
system
upgrade,
elevator
retrofit,
ADA
 compliant Police
Facility,
energy,
conserva3on
upgrades,
including
HVAC,
bathroom
retrofit
for
water
conserva3on,
and
 winddow
replacement Open
Space
Acquisi3on,
purchase
property
to
preserve
green
space
in
our
community












4,000,000


40

Shreveport

LA

Energy












5,000,000


50

Shreveport

LA

Energy












5,000,000


50

Shreveport

LA

Energy












6,000,000


60

Shreveport

LA

Energy












6,500,000


65

Shreveport

LA

Public
Safety

Mul3‐Modal
Transporta3on
Improvements,
crea3ng
alterna3ve
automobile
transporta3on,
bike,
and
 pedestrian
facili3es,
transit
connec3ons,
and
public
informa3on Fire
Sta3on
No.
11
‐
kitchen
expansion,
interior
cosme3c
repairs,
and
engine
room
floor
drain














125,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
12
‐
kitchen,
dayroom,
updated
floors,
interior
cosme3c
repairs,
roof
and
fence
















60,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
13
‐
finish
Bafalion
Chief's
bedroom
and
add
full‐size
doors
















65,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
18
‐
kitchen,
dayroom,
floors,
and
bathrooms
updated
















40,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
20
‐
interior
repairs
and
fence
















30,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
22
‐
back
driveway,
bedding,
landscaping,
and
fence














100,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
5
‐
interior
renova3on
(extra
bathroom)
officers
















45,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
6
‐
interior
renova3on
(kitchen,
dayroom,
bathrooms
updated),
and
floors
















40,000


1

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
7
‐
kitchen,
dayroom
updated,
and
floors
















40,000


1

Clyde
Fant
Parkway
Recrea3on
Area
Improvement,
including
greenway
improvement,
tree
plan3ng,
and
 infrastructure
upgrades Emerging
Technologies
Demonstra3on
and
Educa3on
Projects
in
public
facili3es,
including
solar
panels,
storm
 water
rain
gardens,
and
green
roofs Louisiana
State
Fairgrounds
energy
upgrades
including
ligh3ng,
HVAC,
tree
plan3ng,
and
landscaping

Funding
Required 












510,000


Jobs 2

City

State

Program

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
8
‐
slab
repair
in
truck
bay,
water
proofing
and
cosme3c
interior
repairs

Project
Descrip3on

Funding
Required 














40,000


Jobs

Shreveport

LA

Public
Safety

Fuming
Chamber
for
Crime
Scene
Inves3ga3on
Processing
















25,000


1

Shreveport

LA

Public
Safety

License
Plate
Reader
(2)
















35,000


1

Shreveport

LA

Public
Safety

Mobile
Processing
Van
for
Crime
Scene
















50,000


1

Shreveport

LA

Public
Safety

One
(1)
Ford
Fuel
Truck
















40,000


1

Shreveport

LA

Public
Safety

Path
Overlay
at
Fire
and
Police
Academy
















80,000


1

Shreveport

LA

Public
Safety

Purchase
of
8
Police‐Equipped
Harley‐Davidsons














150,000


1

Shreveport

LA

Public
Safety

Equipment
for
Special
Response
Team
(SRT)














200,000


2

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
10
‐
exterior
preserva3on,
roof,
and
interior
cosme3c
repairs














250,000


2

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
4
‐
interior
renova3on
(move
all
bedrooms
upstairs)














175,000


2

Shreveport

LA

Public
Safety

Patrol
Rifles
(200)














250,000


2

Shreveport

LA

Public
Safety

Seven
(7)
fire‐equipped
Chevrolet
Suburban
Vehicles














420,000


2

Shreveport

LA

Public
Safety

Special
Response
Team
(SRT)
Armored
Vehicle














250,000


2

Shreveport

LA

Public
Safety

Twelve
(12)
Ford
Expedi3ons
Vehicles














288,000


2

Shreveport

LA

Public
Safety

Fire
Maintenance
Facility,
parking
apron,
generator,
test
pit
cover,
parking
lot,
and
fuel
island
for
new
shop














300,000


3

Shreveport

LA

Public
Safety

Purchase
of
8
Police‐Equipped
Chevy
Tahoes














384,000


3

Shreveport

LA

Public
Safety

Replacement
of
Elevators
at
James
C.
Gardner
Police
Building














300,000


3

Shreveport

LA

Public
Safety

Two
(2)
new
medic
units














530,000


3

Shreveport

LA

Public
Safety

Four
(4)
refurbished
medic
units














740,000


4

Shreveport

LA

Public
Safety

One
(1)
ladder
truck














965,000


5

Shreveport

LA

Public
Safety

West
Net
First
Aler3ng
System
in
19
Fire
Sta3ons














600,000


6

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
16
‐
extensive
interior
remodeling,
dayroom,
kitchen,
bathrooms,
and
bedrooms,
roof














750,000


7

Shreveport

LA

Public
Safety














750,000


7

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
19
‐
kitchen,
dayroom,
floors,
bathrooms
updated,
office
renova3ons,
fence
and
bedroom
 configura3on Fire
Sta3on
No.
9
‐
new
bedroom
wing
on
north
side,
roof
and
interior
cosme3c
repairs














850,000


8

Shreveport

LA

Public
Safety

Fire
Sta3on
No.3,
expansion
to
east
side
(day
room,
kitchen,
and
captain's
office)
already
designed














850,000


8

Shreveport

LA

Public
Safety

Replacement
of
Payroll
System












1,750,000


8

Shreveport

LA

Public
Safety

Install
Surveillance
Cameras
System
City‐Wide
with
Shot‐Spofer
Technology












3,000,000


10

Shreveport

LA

Public
Safety

Replacement
of
Accoun3ng
and
Purchasing
System












2,000,000


10

Shreveport

LA

Public
Safety

Replacement
of
Water
Billing
System












2,000,000


10

Shreveport

LA

Public
Safety

Purchase
of
25
Police‐Equipped
Dodge
Chargers












1,100,000


11

Shreveport

LA

Public
Safety

New
Mobile
Command
Vehicle












1,300,000


13

Shreveport

LA

Public
Safety

Parking
Facility
at
James
C.
Gardner
Police
Headquarters












2,000,000


20

Shreveport

LA

Public
Safety

Renova3on
at
City
Jail












2,000,000


20

Shreveport

LA

Public
Safety

Ten
(10)
new
fire
trucks












4,650,000


20

Shreveport

LA

Public
Safety

Construc3on
of
Student
Parking
at
Fire
and
Police
Academy












2,400,000


24

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
1‐
Two
extra
engine‐room
bays
and
15

extra
bedrooms
per
original
design












2,700,000


27

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
14
‐
reloca3on
to
fit
master
plan












2,900,000


29

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
15
‐
reloca3on
to
fit
master
plan












2,900,000


29

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
17
‐
reloca3on
to
fit
master
plan












2,900,000


29

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
2
‐
reloca3on
to
fit
master
plan












2,900,000


29

Shreveport

LA

Public
Safety

Fire
Sta3on
No.
23
‐
new
sta3on
to
meet
master
plan












2,900,000


29

Shreveport

LA

Public
Safety

Purchase
of
80
Police‐Equipped
Ford
Crown
Victorias












3,600,000


36

Shreveport

LA

Public
Safety

Rebuild
and
Upgrade
Cross
Lake
Patrol
Facility












4,000,000


40

Shreveport

LA

Public
Safety

Renova3on
of
Fire
and
Police
Academy












4,000,000


40

Shreveport

LA

Public
Safety

Construc3on
of
Evidence
Property
Building
with
Secure
Fence
Facility












5,000,000


50

Shreveport

LA

Public
Safety












5,000,000


50

Shreveport

LA

Public
Safety

James
C.
Gardner
Police
Facility
Upgrades,
includes
upgrades
to
meet
ADA
compliance,
covered
parking
for
 emergency
response
vehicles,
and
Crime‐Scene
Inves3ga3on
Laboratory New
Office
and
Storage
Facility
for
Downtown
Mounted
Patrol
Facility












5,000,000


50

Shreveport

LA

Public
Safety

COPS
Hiring
Grant
for
90
Addi3onal
Police
Officers
‐
includes
cars,
equipment,
training,
and
first
year
salary












7,200,000


90

Shreveport

LA

Public
Safety

Emergency
Vehicle
Opera3on
Center










10,000,000


100

Shreveport

LA

Public
Safety

Construct
Outdoor
Pistol
and
Rifle
Range
to
Include
Live‐Fire
Training










12,000,000


120

Shreveport

LA

Public
Safety

Construc3on
of
700
MHZ
Interoperable
Communica3ons
System
for
Public
Safety/Homeland
Security










20,000,000


200

Shreveport

LA

Public
Safety

Contruc3on
of
Cyber
Opera3ons
Security
Ins3tute
at
Louisiana
State
University
in
Shreveport
(LSUS‐COSI)










40,000,000


400

Shreveport

LA

Public
Safety

Permanent
Mass‐Evacua3on
Shelter










50,000,000


500

Shreveport

LA

Public
Safety

Construct
Regional
Emergency
Opera3ons
Center,
may
also
serve
as
Backup
EOC
for
State
of
Louisiana








100,000,000


1000

Shreveport

LA

Streets/Roads

100
Block
Oakridge
Drainage

Shreveport

LA

Streets/Roads

Ravendale
@
Old
Mooringsport
Road
Intersec3on














850,000


8

Shreveport

LA

Streets/Roads

Box
Culvert/ditch
along
Bert
Kouns
@
Town
South
Apartments












1,200,000


12

Shreveport

LA

Streets/Roads

Hollywood
Avenue
at
Mansfield
Road
Intersec3on












1,200,000


12

Shreveport

LA

Streets/Roads

Red
Stone
Ditch
Paving












1,200,000


12

Shreveport

LA

Streets/Roads

Fernwood
‐
Valley
View
Ditch
Paving












1,350,000


13

Shreveport

LA

Streets/Roads

Green
Terrace
Ditch
Paving












1,300,000


13

Shreveport

LA

Streets/Roads

McAdoo
Street,
Coronado,
Birch,
and
Normandie
Drive
Drainage
Improvements












1,300,000


13

Shreveport

LA

Streets/Roads

Line
Avenue
@
Ockley
Drive
Intersec3on












1,500,000


15

Shreveport

LA

Streets/Roads

Aiport
Ditch
Repairs
(Wyngate
Drive)












1,600,000


16

Shreveport

LA

Streets/Roads

Gilbert
Bayou
Overflow
Bridge
west
of
Dean
Road












1,600,000


16

Shreveport

LA

Streets/Roads

Summer
Grove
Ditch
Repairs












1,600,000


16

Shreveport

LA

Streets/Roads

Valleyview
Bridge
Improvements
at
Airport
Ditch












1,750,000


17

Shreveport

LA

Streets/Roads

Gilbert
Lateral
Ditch
Paving












1,800,000


18

1

City

State

Program

Shreveport

LA

Streets/Roads

Pierremont
Park
Ditch/Gilbert
Lateral

Project
Descrip3on

Funding
Required 










1,800,000


Jobs 18

Shreveport

LA

Streets/Roads

Shreveport

LA

Streets/Roads

Williamson
Way
Extension












1,800,000


18

Audrey
Lane
Ditch
Paving
(2800
block
of
Freddie
to
end)












2,000,000


Shreveport

LA

20

Streets/Roads

I‐20
Entrance/Exit
to
State
Fairgrounds












2,000,000


Shreveport

20

LA

Streets/Roads

Jewella
Avenue
Bridge
Improvements
at
Airport
Ditch












2,000,000


20

Shreveport

LA

Streets/Roads

Kings
Highway
at
Hearne
Avenue
Intersec3on












2,000,000


20

Shreveport

LA

Streets/Roads

MLK
Ditch
Paving
(Linear
St.
upstream
to
exis3ng
paved
sec3on)












2,000,000


20

Shreveport

LA

Streets/Roads

Purchase
of
Flood‐prone
Proper3es












2,000,000


20

Shreveport

LA

Streets/Roads

Cherokee
Park
Ditch
Improvements












2,100,000


21

Shreveport

LA

Streets/Roads

Jones‐Mabry
Lateral
Paving












2,200,000


22

Shreveport

LA

Streets/Roads

KCS
Railroad
Overpasses












2,500,000


25

Shreveport

LA

Streets/Roads

Murphy
Street
Viaduct
Replacement












2,500,000


25

Shreveport

LA

Streets/Roads

Repair
and
upgrade
of
fencing
and
sound
barriers
on
I‐20
and
I‐49












2,500,000


25

Shreveport

LA

Streets/Roads

South
Lakeshore
Drive
Bridge
Replacement












2,500,000


25

Shreveport

LA

Streets/Roads

Buncombe
Road
Widening












2,800,000


28

Shreveport

LA

Streets/Roads

Fant
Parkway
Bridge
@
Island
Park












3,000,000


30

Shreveport

LA

Streets/Roads

Hearne
Avenue
at
Midway
Flood
Improvements












3,000,000


30

Shreveport

LA

Streets/Roads

Repair
and
reconstruc3on
of
State
Fairgrounds
surface
lots
and
streets












3,100,000


31

Shreveport

LA

Streets/Roads

Cur3s
Lane
Widening












3,200,000


32

Shreveport

LA

Streets/Roads

Union
Pacific
Overpass
at
Shreve
Park
Industrial
Campus












3,500,000


35

Shreveport

LA

Streets/Roads

East
Southfield
Extension












3,900,000


39

Shreveport

LA

Streets/Roads

Kingston
Road
Widening












4,000,000


40

Shreveport

LA

Streets/Roads

Brush
Bayou
Clearing
and
Dredging












4,500,000


45

Shreveport

LA

Streets/Roads

Knight
Street
Improvements












4,500,000


45

Shreveport

LA

Streets/Roads

Flournoy
Lucas
Road
Widening












5,500,000


55

Shreveport

LA

Streets/Roads

MLK
Ditch
Paving
(Jones‐Mabry
to
north
of
Willis)












6,000,000


60

Shreveport

LA

Streets/Roads

Norris
Ferry/Harts
Island
Road
Study
Projects












6,000,000


60

Shreveport

LA

Streets/Roads

Russell
Road
Widening
and
Flood
Improvements
with
Entrance
to
North
Regional












6,000,000


60

Shreveport

LA

Streets/Roads

Pines
Road
Widening












7,800,000


78

Shreveport

LA

Streets/Roads

Railroad
Crossings












8,000,000


80

Shreveport

LA

Streets/Roads

Street
Ligh3ng
Improvements












8,000,000


80

Shreveport

LA

Streets/Roads

Bickham
Bayou
Paving












8,400,000


84

Shreveport

LA

Streets/Roads

Ellerbe
Road
Widening












8,400,000


84

Shreveport

LA

Streets/Roads

Extension
of
LA
526
(Industrial
Loop)












8,800,000


88

Shreveport

LA

Streets/Roads

Drainage
Ditch
Repair












9,000,000


90

Shreveport

LA

Streets/Roads

Kings
Highway
Corridor
Improvements












9,000,000


90

Shreveport

LA

Streets/Roads

City‐Wide
Resurfacing










10,000,000


100

Shreveport

LA

Streets/Roads

Roy
Road
Widening










11,500,000


115

Shreveport

LA

Streets/Roads

City‐Wide
Drainage
Improvements










12,000,000


120

Shreveport

LA

Streets/Roads

Linwood
Avenue
Widening










12,000,000


120

Shreveport

LA

Streets/Roads

Stoner
Avenue
Overpass










12,000,000


120

Shreveport

LA

Streets/Roads

Brush
Bayou
Paving










15,000,000


150

Shreveport

LA

Streets/Roads

Linwood
Avenue
Overpass










15,600,000


156

Shreveport

LA

Streets/Roads

Hilry
Huckaby
Widening
(LA
173)










16,000,000


160

Shreveport

LA

Streets/Roads

Wallace
Lake
Road
Widening










16,000,000


160

Shreveport

LA

Streets/Roads

Youree
Drive
Widening
(Sand
Beach
Blvd.
to
Millicent
Way)










16,000,000


160

Shreveport

LA

Streets/Roads

I‐20
Soundwall
(Monkhouse
to
Hearne)










18,000,000


180

Shreveport

LA

Streets/Roads

GIS
Program










20,000,000


200

Shreveport

LA

Streets/Roads

Fant
Parkway
Extension










25,000,000


250

Shreveport

LA

Streets/Roads

City‐Wide
Concrete
Replacement










30,000,000


300

Shreveport

LA

Streets/Roads

City‐Wide
Sidewalk
Repair










30,000,000


300

Shreveport

LA

Streets/Roads

Red
River
Crossing
at
70th
Street
Bridge










35,000,000


350

Shreveport

LA

Streets/Roads

LA
3132
(Flournoy‐Lucas
to
Highway
1)










38,000,000


380

Shreveport

LA

Streets/Roads

Southern
Loop
Extension










40,000,000


400

Shreveport

LA

Streets/Roads

South
Lakeshore
Drive
Widening












5,000,000


500

Shreveport

LA

Streets/Roads

Traffic
Signal
Improvements
(ITS)










78,000,000


780

Shreveport

LA

Streets/Roads

City‐Wide
Neighborhood
Street
Improvements








130,000,000


1300

Shreveport

LA

Streets/Roads

I‐49
North
($288M
total
unfunded
construc3on,
$182M
ready
to
bid)








288,000,000


2880

Shreveport

LA

Transit

Digital
Security
System
at
Maintenance
Facility
















25,000


1

Shreveport

LA

Transit

One
(1)
Bus‐Washing
System














150,000


1

Shreveport

LA

Transit

One
(1)
Wrecker
Truck














200,000


1

Shreveport

LA

Transit

Trash
receptacles
for
120
bus
stops
















84,000


1

Shreveport

LA

Transit

Two
(2)
Paratransit
Vans
















72,000


1

Shreveport

LA

Transit

Upgrade
Security
Camera
Systems
for
Buses
and
Terminals














150,000


1

Shreveport

LA

Transit

AVL
System
for
Transit
Buses














350,000


3

Shreveport

LA

Transit

Renova3ons
of
Bus
Stops












1,000,000


10

Shreveport

LA

Transit

CNG
Fast‐Fill
Filling
Sta3on














150,000


15

Shreveport

LA

Transit

CNG
Slow‐Fill
Filling
Sta3on












1,500,000


15

Shreveport

LA

Transit

Remodel
Terminal
‐
including
all
ADA‐compliance












3,000,000


30

Shreveport

LA

Transit

Seventeen
(17)
CNG
buses












7,000,000


35

City

State

Program

Shreveport

LA

Water

Lucas
WWTP
Effluent
Line
Repair

Project
Descrip3on

Funding
Required 












250,000


Jobs

Shreveport

LA

Water

Repair
and
Upgrade
of
Pine
Hills
Lib
Sta3on














250,000


Shreveport

LA

Water

Waste
Grease
Collec3on
Equipment














250,000


2

Shreveport

LA

Water

Construc3on
of
Lib
Sta3on
Maintenance
Building












1,000,000


10

Shreveport

LA

Water

Repair
and
Upgrade
of
Hardy
Lib
Sta3on












1,000,000


10

Shreveport

LA

Water

Southeast
Shreveport
Wallace
Lake
Water
Line












1,200,000


12

Shreveport

LA

Water

Repair
and
Upgrade
of
Broadmoor
Lib
Sta3on












1,300,000


13

Shreveport

LA

Water

Repair
and
Upgrade
of
South
Highland
Lib
Sta3on












1,300,000


13

Shreveport

LA

Water

Repair
and
Upgrade
of
Darien
Lib
Sta3on












1,500,000


15

Shreveport

LA

Water

Supervisory
Control
and
Data
Acquisi3on
(SCADA)
Upgrade












1,500,000


15

Shreveport

LA

Water

Repair
and
Upgrade
of
Agurs
Lib
Sta3on












2,000,000


20

Shreveport

LA

Water

Repair
and
Upgrade
of
North
Regional
WWTP
Effluent
Line
and
Ouzall












2,500,000


25

Shreveport

LA

Water

Amiss
WTP
New
High
Service
Pumps












2,800,000


28

Shreveport

LA

Water

Emergency
Generators
at
Lucas
Wastewater
Treatment
Plant
and
North
Regional
Water
Treatment
Plant












3,000,000


30

Shreveport

LA

Water

Lib
Sta3on
Control
and
Communica3on
Panel
Upgrades












3,000,000


30

Shreveport

LA

Water

Amiss
WTP
Raw
Water
Pipe
Modifica3ons












3,600,000


36

Shreveport

LA

Water

North
Regional
Water
Treatment
Plant
Sludge
System
Improvements












3,600,000


36

Shreveport

LA

Water

Amiss
WTP
Emergency
Generators












4,000,000


40

Shreveport

LA

Water

Querbes
Lib
Sta3on
Improvements












4,000,000


40

Shreveport

LA

Water

North
Regional
Water
Treatment
Plant
Flow
Equaliza3on
Improvements












4,300,000


43

Shreveport

LA

Water

Lucas
Lib
Sta3on
Improvements












5,000,000


50

Shreveport

LA

Water

Blanchard/Havanna
Water
and
Sewer
Main
Improvements












6,000,000


60

Shreveport

LA

Water

Twelve
Mile
Bayou
Pump
Sta3on
Improvements












7,300,000


73

Shreveport

LA

Water

Amiss
WTP
Plant
2
Rehabilita3on












8,000,000


80

Shreveport

LA

Water

City‐Wide
Lib
Sta3on
Improvements












8,000,000


80

Shreveport

LA

Water

AMiss
WTP
Line
and
Caus3c
Feed
Improvements












9,500,000


95

Shreveport

LA

Water

Amiss
WTP
Plant
2E
Rehabilita3on










10,000,000


100

Shreveport

LA

Water

Improvements
to
Cross
Lake
Dam










10,000,000


100

Shreveport

LA

Water

Amiss
Water
Treatment
Plant
Ozone
System
Upgrade










16,500,000


165

Shreveport

LA

Water

City‐wide
sewer
system
repair
and
upgrade










20,000,000


200

Shreveport

LA

Water

City‐Wide
Water
system
repair
and
upgrade










20,000,000


200

Shreveport

LA

Water

Installa3on
of
automated
meter
reading
program










25,000,000


250

Shreveport

LA

Water

City‐Wide
Cured
in
Place
Pipe
Repairs
for
Server
Mains










30,000,000


300

Shreveport

LA

Water

Dredging
Cross
Lake










80,000,000


800

Shreveport

LA

Water

North
Shreveport
30MGD
Water
Treatment
Plant








160,000,000


1600

Shreveport

LA

Water

South
Shreveport
30MGD
Water
Treatment
Plant








160,000,000


1600

Amesbury

MA

Energy

Site
renewable
energy
projects
at
municipal
facili3es.




Amesbury

MA

Public
Safety

Repair
and
renova3on
of
Police
Building
to
create
a
fully
accessible,
energy
efficient
building

Amesbury

MA

Streets/Roads

Rebuild
R
Street
Bridge.

Amesbury

MA

Transit

Amesbury

MA

Water

Construc3on
and
fit
out
of
Merrimack
Valley
Regional
Transporta3on
Center.

The
center
is
located
in
 Amesbury's
downtown
and
will
support
sustainable
transit‐oriented
development
and
provide
energy
efficient
 municipal
office
space. Replace
water
infrastructure
beneath
Elm
Street.

Needed
before
street
improvements
can
be
made

Boston

MA

CDBG

329‐331
West
Broadway‐2,300
square
feet
Commercial
Space














200,000


Boston

MA

CDBG

Quincy
Street‐Blue
Hill
Ave‐‐Development
of
Parcels
to
Support
Blue
Hill
Ave.
Business
District














425,000


Boston

MA

CDBG

Repair
and
renovate
the
animal
shelter














365,000


Boston

MA

CDBG

Masonry
repairs
at
Engine
41














500,000


Boston

MA

CDBG

Great
Hall
at
Codman
Square:
masonry
and
accessibility
improvements














870,000


6

Boston

MA

CDBG

Masonry
repairs
at
the
Vine
Street
and
Paris
Street
Centers












1,100,000


10

Boston

MA

CDBG

Repair
and
stabilize
seawall
at
the
Boston
Fire
Department's
Training
Facility
on
Moon
Island












1,340,000


10

Boston

MA

CDBG

Waterproofing,
HVAC,
window
repair
at
municipal
annex












1,500,000


12

Boston

MA

CDBG

Slab
Shoring
and
sealing
at
8
fire
sta3ons












2,000,000


16

Boston

MA

CDBG

Charlestown
Navy
Yard
Pier
4
improvements












1,550,000


19

Boston

MA

CDBG

Curley
Community
Center
Roof
Replacement












2,500,000


20

Boston

MA

CDBG

Renovate
and
upgrade
facili3es
at
two
Community
Centers












2,500,000


20

Boston

MA

CDBG

Boston
Marine
Industrial
Park
Phase
1
‐
Rail
improvements












1,745,000


25

Boston

MA

CDBG

Boston
Marine
Industrial
Park‐Razing
of
6
Tide
Street












1,600,000


25

Boston

MA

CDBG

Brownfields
Sites‐
Lewis
Chemical
and
B‐Street
Extension












3,000,000


25

Boston

MA

CDBG

Roof
replacement
at
four
branch
libraries












3,350,000


25

Boston

MA

CDBG

Brighton
Branch
Library
Renova3on












5,500,000


45

Boston

MA

CDBG

Newmarket
Square
Industrial
District‐Infrastructure
Improvements













1,800,000


45

Boston

MA

CDBG

East
Boston
Stadium
improvements












6,000,000


48

Boston

MA

CDBG

Boston
Marine
Industrial
Park‐
Access
Road
Industrial
Improvements












4,600,000


85

Boston

MA

Energy

City
of
Boston
Renewable
Energy
Installa3ons












4,450,000


25

Boston

MA

Energy

Boston
Integrated
Energy
Management
Plan
Implementa3on












8,000,000


40

Boston

MA

Energy

Residen3al
Energy
Efficiency
Program
(Low
and
Moderate
Income)












6,000,000


40

Boston

MA

Housing

Boston
Housing
Capital
Project
Accelera3on
for
Family
and
Elderly
Housing










28,000,000


280

Boston

MA

Public
Safety

Shotspofer

Expansion

Boston

MA

Schools

Technology
Goes
Home
expansion
to
2000
families












2,000,000


Boston

MA

Schools

Electrical
Upgrades
at
3
schools












1,700,000


2 2














500,000


2












2,000,000


10














500,000


25












2,000,000


50












1,000,000


15

4














241,500
 12

City

State

Program

Boston

MA

Schools

Accessibility
Projects

Project
Descrip3on

Funding
Required 










2,000,000


Jobs 16

Boston

MA

Schools

Boston

MA

Schools

Window
replacements
at
various
schools












2,900,000


20

Upgrade
or
replace
Fire
Systems
at
various
schools












3,000,000


Boston

MA

24

Schools

Upgrade
or
repair
HVAC
at
various
schools












4,000,000


Boston

32

MA

Schools

Middle
School
renova3on












5,000,000


40

Boston

MA

Schools

Roof
Replacements
at
various
schools












5,000,000


40

Boston

MA

Schools

Exterior
and
masonry
repairs
at
various
schools












6,000,000


48

Boston

MA

Streets/Roads

Bike
Lanes
Network
Expansion












3,200,000


24

Boston

MA

Streets/Roads

Broad
Street












4,500,000


50

Boston

MA

Streets/Roads

American
Legion
Highway
Bridge












7,000,000


56

Boston

MA

Streets/Roads

Roadway
Reconstruc3on
in
priority
areas










15,000,000


120

Boston

MA

Streets/Roads

Sidewalk
Reconstruc3on
and
Pedestrian
Ramps










30,000,000


240

Boston

MA

Transit

Traffic
Management
Technology
Improvements












3,000,000


Brockton

MA

CDBG

10
City
Sidewalk
Plows














850,000


Brockton

MA

CDBG

DPW
Equipment
Needs












2,827,000


5

Brockton

MA

CDBG

Downtown
Store
Front
Project












1,500,000


10

Brockton

MA

CDBG

Cosgrove
City
Pool
Restora3on
Project














650,000


15

Brockton

MA

CDBG

Lifle
League/Field
Ligh3ng
Project
(8)














320,000


15

Brockton

MA

CDBG

Manning
Pool
Upgrade














350,000


20

Brockton

MA

CDBG

Parmenter
Field
Turf
Project
(2)












2,200,000


20

Brockton

MA

CDBG

Skateboard
Park
(2)














400,000


20

Brockton

MA

CDBG

War
Memorial
Phase
3
Restora3on












1,200,000


20

Brockton

MA

CDBG

Fire
Sta3ons
Restora3on












3,500,000


30

Brockton

MA

CDBG

SouthSide
Fire
Sta3on
Reconstruc3on












3,000,000


30

Brockton

MA

CDBG

Snow
Park
Phase
Two
Project












1,200,000


40

Brockton

MA

CDBG

Downtown
Parking
Garage












7,100,000


50

Brockton

MA

CDBG

Improvements
and
Sprinkler
System
for
Historical
City
Hall












1,950,000


50

Brockton

MA

CDBG

New
Oak
and
Bafle
Street
Fire
Sta3on












6,500,000


50

Brockton

MA

CDBG

3
Police
Sub
Sta3ons
for
New
ComStat
Sytem
and
Community
Police
Model












1,200,000


60

Brockton

MA

CDBG

DW
Field
Park
and
Golf
Restora3on
Project












1,200,000


70

Brockton

MA

CDBG

Brockton
Youth
Indoor
Sports
Complex












7,600,000


80

Brockton

MA

CDBG

Brockton
Curtural
Arts
Center
at
The
Corcoran
Building










11,000,000


100

Brockton

MA

CDBG

Public
Safety
Building










27,000,000


100

Brockton

MA

CDBG

School
Conversion
to
Teen/Youth
Center












3,500,000


130

Brockton

MA

Energy

Grove
Street
#2
Solar
Array
Project












5,000,000


20

Brockton

MA

Energy

Solar
Panels
electricity
and
water
Marciano
Stadium














500,000


20

Brockton

MA

Energy

Develop
Solar
Field
at
the
Landfill












4,000,000


30

Brockton

MA

Energy

Solar
Panels
in
schools












2,500,000


40

Brockton

MA

Energy

Renewable
Energy
(Wind
or
Solar)












8,000,000


50

Brockton

MA

Housing

Expend
the
Walnut‐Turner
ini3a3ve










12,000,000


20

Brockton

MA

Housing

Hawley
Street
Housing
Complex
Restora3on












1,500,000


25

Brockton

MA

Housing

Sullivan
Housing
Towers
Restora3on












1,500,000


25

Brockton

MA

Housing

Homeowners
Rehab
Program












5,000,000


50

Brockton

MA

Housing

Kennedy
Housing
Drive
Restora3on












2,500,000


50

Brockton

MA

Housing

Washburn
Heights
Housing
Complex
Restora3on












4,500,000


50

Brockton

MA

Housing

Buy
Brockton
Mul3‐Family
Phase










10,000,000


100

Brockton

MA

Housing

Senior
Housing
High‐Rise
Restora3on
Project
(4)












4,000,000


100

Brockton

MA

Public
Safety

Gun
Detec3on
Systems

Brockton

MA

Public
Safety

Handheld
Radios

Brockton

MA

Public
Safety

Police
Cruisers
(30)

Brockton

MA

Public
Safety

Surveleillance
Cameras














160,000


Brockton

MA

Public
Safety

10
Police
Motorcycles














300,000


0

Brockton

MA

Public
Safety

10
Segway
X2
Police
Units
















75,000


0

Brockton

MA

Public
Safety

BEMA
Light
Duty
Rescue
Unit
















95,000


0

Brockton

MA

Public
Safety

Emergency
Back‐up
Generators
(4)
















40,000


0

Brockton

MA

Public
Safety

Fire
Pump
Units
(2)












1,000,000


0

Brockton

MA

Public
Safety

Haz‐Mat
Unit
Fully
NFPA
1901
compliant














250,000


0

Brockton

MA

Public
Safety

Portable
Emergency
Generators
(10)

















5,000


0

Brockton

MA

Public
Safety

Command
Center
Faber
Model:
S39WB‐MT55‐260HP














478,000


2

Brockton

MA

Public
Safety

Street
Outreach
Worker
Program














485,000


6

Brockton

MA

Public
Safety

Fire
Fighters
(2yrs)












4,300,000


40

Brockton

MA

Public
Safety

Police
Officers
and
Training
(2
yrs)












5,300,000


50

Brockton

MA

Public
Safety

Brockton
Aber
Dark
Support
Project














350,000


100

Brockton

MA

Schools

South
Jr
High
Baseball
Field
Reconstruc3on












1,000,000


15

Brockton

MA

Schools

High
School
Parking
Restora3on












2,000,000


20

Brockton

MA

Schools

North
Jr
High
Soccer
and
Football
Field
Reconstruc3on












1,500,000


25

Brockton

MA

Schools

10
Elementary
schools
Air
Quality
Improvements












2,000,000


40

Brockton

MA

Schools

Brockton
High
Renova3ons












2,500,000


40

Brockton

MA

Schools

High
School
Stadium
Renova3ons












2,500,000


40

Brockton

MA

Schools

HVAC
at
the
High
School












8,500,000


40

5














916,000
 












300,000
 










1,050,000


City

State

Program

Project
Descrip3on

Brockton

MA

Schools

6
School
Play
areas

Funding
Required 












300,000


Jobs 60

Brockton

MA

Schools

Retrofiqng
Junior
High
with
energy
Effecient
windows
and
doors












4,000,000


60

Brockton

MA

Schools

8
schools
Roof
Repair/Renova3on












1,600,000


80

Brockton

MA

Schools

Cafetaria
Upgrades
8
schools












4,000,000


80

Brockton

MA

Schools

Upgrading
the
4
Jr
High
Schools
needs
to
include
AC
instala3on
in
Auditorium












8,000,000


80

Brockton

MA

Streets/Roads

Court
Street












4,500,000


15

Brockton

MA

Streets/Roads

West
Elm
Street












2,000,000


15

Brockton

MA

Streets/Roads

Widen
Belmont
Street
near
the
VA.












4,500,000


15

Brockton

MA

Streets/Roads

Alger
Street
restora3on












1,500,000


20

Brockton

MA

Streets/Roads

Bates
Road
Resurfacing














600,000


20

Brockton

MA

Streets/Roads

East
Street
Phase
Two
Reconstruc3on












2,750,000


20

Brockton

MA

Streets/Roads

Field
Street
Reconstruc3on














525,000


20

Brockton

MA

Streets/Roads

Pleasant
Street












2,000,000


20

Brockton

MA

Streets/Roads

Tina
Ave
Resurfacing
and
Sidewalks














273,000


20

Brockton

MA

Streets/Roads

Center
Street












4,000,000


25

Brockton

MA

Streets/Roads

Crescent
Street












4,000,000


25

Brockton

MA

Streets/Roads

Plain
Street
Reconstruc3on












2,900,000


30

Brockton

MA

Streets/Roads

Carl
Ave
Resurfacing
and
Sidewalks












2,250,000


40

Brockton

MA

Streets/Roads

Downtown
Circula3on












6,500,000


40

Brockton

MA

Streets/Roads

Montello
Street
Reconstruc3on












2,500,000


40

Brockton

MA

Streets/Roads

North
Cary
Street
Reconstruc3on












2,650,000


40

Brockton

MA

Streets/Roads

Pine
Street
Reconstruc3on












2,250,000


40

Brockton

MA

Streets/Roads

Main
Street
Reconstruc3on












3,500,000


45

Brockton

MA

Streets/Roads

Forest
Ave
Reconstruc3on












3,400,000


50

Brockton

MA

Streets/Roads

West
Chestnut
Street
Reconstruc3on












2,900,000


50

Brockton

MA

Transit

Camera
System
for
Fixed
Route
Buses














250,000


1

Brockton

MA

Transit

AVL/GPS
for
Paratransit
Fleet












1,000,000


2

Brockton

MA

Transit

Brockton
Aber
Dark
Bus














325,000


2

Brockton

MA

Transit

Fixed
Route
Hybrid
Buses
(6)
at
$540,000
each












3,240,000


2

Brockton

MA

Transit

Revenue
Collec3on
Equipment












1,000,000


2

Brockton

MA

Transit

Fixed
Route
Transit
Coaches
(16)
at
$325,000
each












5,200,000


4

Brockton

MA

Water

Collec3on
System
Rehab












3,000,000


15

Brockton

MA

Water

Alger
Street
sewer
lines












2,000,000


30

Brockton

MA

Water

Main
Street
water
main
Restora3on












5,000,000


50

Brockton

MA

Water

Montello
Street
water
main
Restora3on












5,000,000


50

Brockton

MA

Water

Brockton
Area
Regional
Wastewater
Management
Project










50,000,000


222

Chicopee

MA

Airport

Terminal
upgrade/Westover
Metropolitan
Airport/State
bond










20,000,000


20

Chicopee

MA

Airport

Airpark
South/extension
of
Airpark
West
Industrial
Park
on
100
access/access
and
infrastructure










20,000,000


25

Chicopee

MA

CDBG

Courthouse
Parking
Lot
‐‐
improvements
and
expansion














500,000


10

Chicopee

MA

CDBG

Downtown
Parking
Lots














700,000


10

Chicopee

MA

CDBG

Downtown
sidewalk
replacement














500,000


10

Chicopee

MA

CDBG

Downtown
Fire
Sta3on
replacement












4,000,000


15

Chicopee

MA

CDBG

Safety
Complex












5,000,000


15

Chicopee

MA

CDBG

Senior
Center












8,000,000


15

Chicopee

MA

CDBG

City
Hall
reorganiza3on
and
former
Main
Library
reuse













2,300,000


20

Chicopee

MA

CDBG










18,200,000


20

Chicopee

MA

Energy

Uniroyal/Facemate
industrial
site.
Site
prepara3on,
demoli3on,
and
environmental
remedia3on
to
ready
50
 acre
brownfield
riverfront
industrial
site
for
redevelopment.
 Energy
efficient
hea3ng
and
cooling
system
for
aging
safety
complex














300,000


10

Chicopee

MA

Energy

Energy
efficient
hea3ng
and
cooling
system
for
former
library
to
enhance
reuse
poten3al














300,000


15

Chicopee

MA

Energy

Energy
efficient
ligh3ng
upgrade
‐‐
all
municiple
buildings












9,000,000


15

Chicopee

MA

Energy

Solarize
municipal
buildings
to
supplement
energy
source












6,000,000


25

Chicopee

MA

Housing

Termite
eradica3on
and
repairs
for
various
loca3ons














500,000


5

Chicopee

MA

Housing

Parking
lot
repair
for
one
complex
















50,000


6

Chicopee

MA

Housing

Replace
roof
in
one
complex














200,000


6

Chicopee

MA

Housing

Upgrade
150
bathrooms
in
one
complex












1,200,000


10

Chicopee

MA

Housing

Upgrade
302
kitchens
in
two
complexes












3,000,000


10

Chicopee

MA

Schools

Old
Chicopee
High/conversion
to
middle
school










14,000,000


25

Chicopee

MA

Streets/Roads

Traffic
flow
improvements
Memorial
Drive
(Rt
33)/Fuller
Road
intersec3on
for
new
shopping
plaza












1,500,000


150

Chicopee

MA

Water

Center
Street
water
main
replacement
in
associa3on
with
full
depth
reconstruc3on
of
Center
Street












2,300,000


25

Haverhill

MA

Amtrak
















60,000


10

Haverhill

MA

CDBG

rail
spurs
on
Downeaster
line
by
Newark
Street
industrial
park
and
upper
Hilldale
Avenue
industrial
park
in
 Haverhill,
MA
(already
designed) new
streetscape,
roadway
improvements,
sidewalks,
drainage
and
trees
in
downtown
Haverhill












1,500,000


20

Haverhill

MA

Energy

Haverhill
Ci3zens
Center
renova3on
to
energy
efficient
standards












2,000,000


25

Haverhill

MA

Public
Safety

Police
Vehicle
Maintenance
Shed
construc3on

Haverhill

MA

Schools

Haverhill

MA

Haverhill

MA

Haverhill














800,000


5

Tilton
School
roof
replacement
and
walls
replacement












1,200,000


15

Schools

renovate
Whiqer
Middle
School










10,000,000


25

Schools

Haverhill
Stadium
renova3ons












7,000,000


40

MA

Schools

new
Hunking
School










25,000,000


100

Haverhill

MA

Streets/Roads

Main
Street
signaliza3on

Haverhill

MA

Streets/Roads

street
inventory
updgrades














750,000


3












8,000,000


10

City

State

Program

Haverhill

MA

Streets/Roads

Route
97
Corridor
project

Project
Descrip3on

Funding
Required 












900,000


Jobs 20

Haverhill

MA

Streets/Roads

Haverhill

MA

Transit

new
Merrimack
River
Boardwalk












5,000,000


25

replace
aging
train
bridge
over
Merrimack
River












5,000,000


Haverhill

MA

30

Water

downtown
water
main
replacement
of
80
year
old
system












2,000,000


Haverhill

10

MA

Water

Newark
Street
drainage
















20,000


20

Haverhill

MA

Water

Replace
North
Avenue
dam
by
Frye's
Pond














850,000


40

Lynn

MA

CDBG

Build
out
for
LynnCAM
studios














500,000


5

Lynn

MA

CDBG

Capital
improvements
to
Mul3‐Service
Center














450,000


10

Lynn

MA

CDBG

Purchase
of
21
Central
Ave
for
life
science
center












1,500,000


10

Lynn

MA

CDBG

Purchase
of
GE
Factory
of
the
Future
by
EDIC
to
be
used
as
Economic
Industrial
Park












3,500,000


10

Lynn

MA

CDBG

Rehabilita3on
of
Whyte’s
Laundry
Site












1,000,000


10

Lynn

MA

CDBG

Renova3on
of
Main
Library












2,000,000


10

Lynn

MA

CDBG

Restora3on
of
GAR
Building














100,000


10

Lynn

MA

CDBG

Restora3on
of
High
Rock
Park














745,000


10

Lynn

MA

CDBG

Restora3on
of
Lynn
Common












1,000,000


10

Lynn

MA

CDBG












1,000,000


50

Lynn

MA

CDBG

Acquisi3on
of
land
adjacent
to
Community
College
for
College
Book
Store
and
Cafeteria.


Project
will
open
up
 classroom
space
for
dental
hygienist
program
and
connect
college
to
downtown
Lynn Reloca3on
of
two
114KV
power
lines
along
waterfront












5,481,000


150

Lynn

MA

Energy

Restora3on
of
Memorial
Auditorium
HVAC
Systems












1,500,000


5

Lynn

MA

Energy

Installa3on
of
20
16.4
foot
wind
turbines












3,000,000


10

Lynn

MA

Energy

School
Boiler
conversions












2,500,000


50

Lynn

MA

Housing

Acquisi3on
of
lower
Washington
Street
Property
for
expedited
development












5,000,000


50

Lynn

MA

Public
Safety

Emergency
Medical
Dispatch
Electronic
Card
Systems
















22,000


1

Lynn

MA

Public
Safety

Fire
Dispatch
Instant
Recorder
















10,000


1

Lynn

MA

Public
Safety

Vesta
Pallas
E911
Call
taking
upgrades














100,000


2

Lynn

MA

Public
Safety

Fire
Sta3on
Aler3ng
System














125,000


5

Lynn

MA

Public
Safety

Street
Police
Cameras














500,000


5

Lynn

MA

Public
Safety

50
new
resource
officers












3,750,000


50

Lynn

MA

Schools

Rehabilita3on
and
reuse
of
O'Keefe
School












1,900,000


15

Lynn

MA

Schools

Marshall
Middle
School
rehab
of
roof,
exterior,
hvac












5,500,000


50

Lynn

MA

Schools

Rehabilita3on
of
Classical
High
School










20,000,000


50

Lynn

MA

Streets/Roads

General
Street
Resurfacing












1,000,000


10

Lynn

MA

Streets/Roads

Reconstruc3on
of
Lynnfield
Street,
Millard
Ave,
Den
Quarry
and
Parker
hill














618,000


10

Lynn

MA

Water

Commuter
Ferry
Purchase














250,000


10

Lynn

MA

Water

Restora3on
of
Flax
Pond
and
implementa3on
of
water
related
ac3vi3es














350,000


10

Lynn

MA

Water

Breed
and
Birch
Pond
Dam
Rehabilita3on












1,800,000


15

Lynn

MA

Water

Rehabilita3on
of
Seaport
Marina












1,000,000


15

Malden

MA

CDBG














285,000


14

Malden

MA

CDBG














450,000


14

Malden

MA

CDBG












1,500,000


22

Malden

MA

CDBG












4,400,000


56

Malden

MA

CDBG












5,800,000


76

Malden

MA

CDBG












6,300,000


80

Malden

MA

Schools












6,000,000


90

Malden

MA

Streets/Roads














750,000


14

Malden

MA

Streets/Roads












1,500,000


22

Malden

MA

Streets/Roads














500,000


28

Malden

MA

Streets/Roads












1,000,000


28

Malden

MA

Streets/Roads












1,093,950


31

Malden

MA

Streets/Roads

Ferryway
Park
Renova3on
‐
Renova3on
of
Ferryway
Park
including
re‐grading
and
addi3ons
and
extension
of
 site
drainage
systems
to
allow
proper
drainage
of
the
playing
surface,
reconstruc3on
of
the
exis3ng
natural
 grass
sobball/baseball
field
and
mult Miller
Park
Renova3on
‐
Phase
II
 Miscellaneous
improvements
to
Miller
Park
including:
general
clearing,
grubbing
and
site
clean
up;
replacing
 safety
surfacing
at
exis3ng
play
equipment;
a
new
aqua3c
playground
including
required
u3li3es
and
control Roosevelt
Park
Renova3on
‐
Renova3on
of
Roosevelt
Park
including
replacing
the
exis3ng
natural
grass
 sobball/baseball
field
and
mul3‐use
rectangular
playing
field
int
he
ouzield
with
new
infilled
synthe3c
turf;
a
 new
sports
ligh3ng
system; Macdonald
Stadium
Renova3on
‐
Renova3on
of
Macdonald
Stadium
including
replacing
the
exis3ng
natural
 grass
playing
surface
with
new
infilled
synthe3c
turf,
reconstruc3ng
the
exis3ng
running
track
with
a
new
6‐ lane
equal
quadrant
resilient
track,
 Waif's
Mount
Renova3on
‐
Comprehensive
renova3on
of
Waif's
Mount
including:
general
clearing,
grubbing
 and
site
clean
up;
improved
access
road
and
visitor
parking;
interpre3ve
parking
signage;
new
walking
trails
 and
paths;
a
new
tot
lot
and
shade
shed South
Broadway
Park
Renova3on‐
 Renova3on
of
South
Broadway
Park
including
replacing
the
exis3ng
natural
grass
baseball
field
and
mul3‐use
 rectangular
laying
field
in
the
ouzield
with
new
infilled
synthe3c
turf;
a
new
sports
ligh3ng
system;
reconf Jenkins
Auditorium
Performing
Arts
Center
at
Malden
High
School.
Renova3on
and
moderniza3on
of
the
 exis3ng
1930‐era
art
deco
styled
Jenkins
Auditorium
at
Malden
High
School
to
create
a
1600
seat
performing
 arts
center
for
school
and
aber‐hour
cultural Centre
Street/Route
60
Commercial
St.
intersec3on
improvements.
Geometric
improvements
and
upgrade
to
 traffic
signal
equipment
at
this
loca3on
to
improve
level
of
service
and
safety. Parking
Garage
Rehabilita3on.
Rehab
of
the
Jackson
Street
Parking
Garage,
the
CBD
Parking
Garage
and
the
 Mountain
Ave.
deck
including
concrete
deck
repairs
and
sealing,
expansion
joint
repairs
and
replacement,
 pain3ng
of
structural
steel
and
other
misce Citywide
Beau3fica3on
Project
Contract
2009‐T‐1
‐‐
Con3nua3on
of
citywide
tree
plan3ng
and
landscaping
 program.

Five
hundred
street
trees
would
be
planted
under
this
project. Traffic
Signal
Improvements
Contract
‐‐
Replacement
and/or
renova3on
of
traffic
signals
and
associated
 equipment
at
several
intersec3ons.

 Malden
Downtown
Central
Business
District
Revitaliza3on
Project
Phase
II.
City
of
Malden
determined
to
 revitalize
a
once
thriving
retail
and
commercial
district
proposes
to
enhance
the
downtown
area
by
providing
 improved
pedestrian
connec3ons
and
street Pleasant
St.‐Malden
Downtown
Revitaliza3on
Project
(Mass.
Highway
605173).
The
City
of
Malden
determined
 to
revitalize
a
once
thriving
retail
and
commercial
district
proposes
to
enhance
the
Pleaant
St.
downtown
area
 by
providing
improved
pedestrian
conne












2,526,000


31

City

State

Program

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Streets/Roads

Malden

MA

Water

Malden

MA

Water

Malden

MA

Water

Malden

MA

Water

Malden

MA

Water

Malden

MA

Water

Northampton

MA

Streets/Roads

Pleasant
Street
Parking
Deck.
Construc3on
of
a
2‐story
100‐space
parking
deck
on
the
site
of
the
former
YMCA
 in
Malden
Square.
This
facility
situated
in
the
Central
Business
District
will
provide
addi3onal
parking
in
the
 downtown
area
for
patrons
and
em Broadway
Sidewalk
and
Roadway
Improvements
‐‐
Reconstruc3on
of
approximately
4800
linear
feet
of
 roadway
pavements
and
sidewalks
on
Broadway
(Route
99)
from
Salem
Street
to
the
Malden/Saugus
city
line.

 The
work
will
include
replacing
deficient
roadway
p Pavement
Rehabilita3on
Program
(Citywide)
‐‐
Repair,
rehabilita3on
and
reconstruc3on
of
roadway
pavements
 in
miscellaneous
loca3ons
to
be
determined
throughout
the
city.

The
work
will
include
crack
sealing;
replacing
 deficient
roadway
patches;
millin Route
60/Commercial
St.
Pedestrian
Overpass.
Construc3on
of
a
pedestrian
bridge
across
Commercial
and
 Centre
streets
to
provide
a
safe,
accessible
pedestrian
connec3on
between
the
MBTA's
Malden
Center
Orange
 Line
Sta3on
and
a
9‐acre
development
site
si Florence
Street
Parking
Garage.
Construc3on
of
a
250‐space
parking
garage
on
the
site
of
the
exis3ng
 municipal
surface
parking
lot
on
Florence
Street.
This
facility
situated
in
the
city's
downtown
central
business
 district
and
civic
center
will
provide
 Salem
Street/Overlook
Ridge
Drive/Route
1
Access
Reconstruc3on
City
of
Malden
in
conjunc3on
with
City
of
 Revere
‐‐
Arterial
roadway
construc3on
including
site
work,
milling,
pavement,
curbs
and
sidewalks.

Project
 intended
to
provide
new
access
connect Government
Center
Reloca3on.
Reloca3on
of
Malden's
municipal
offices
from
their
current
loca3on
at
 Government
Center
in
order
to
demolish
the
building
and
reconnect
the
road
that
it
made
a
dead‐end,
thereby
 choking
business
to
the
exis3ng
retailers.
T Wellington
Circle
Improvements,
Medford,
MA
‐‐
Comprehensive
reconfigura3on,
realignment
and
 reconstruc3on
of
Wellington
Circle
(the
intersec3on
of
Route
16
and
Route
28)
including
grade
separa3on
of
 Rt.
16
and
Rt.
28.

This
project
is
a
significant
e Municipal
Drainage
System
Rehabililta3on
Program
(Citywide).
Clean
and
rehab
por3ons
of
the
city's
municipal
 storm
drain
system
at
loca3ons
throughout
the
city.
The
municipal
drainage
system
consists
of
approx.
80
miles
 of
drainage
pipes
and
culverts
a Public
Works
Improvement
Program
Contract
2009‐S‐2
(Citywide
Sewer
Rehabilita3on).
Rehabilita3on
and/or
 replacement
of
approx.
12,500
LF
of
wastewater
collec3on
and
conveyance
piping
including
in‐situ
lining,
 replacement/spot
repair
of
structurally
def Public
Works
Improvements
Program
Contract
2009‐H/W‐1.
Replacement
of
approx.
5,000
LF
of
circa‐1900
 unlined
cast
iron
water
mains
with
new
cement‐lined
duc3le
iron
pipe,
including
replacement
of
approx.
150
 lead
residen3al
and
commercial/industrial
ser Public
Works
Improvements
Program
Contract
2009‐H/W‐2.
Replacement
of
approx.
5,000LF
of
circa‐1900
 unlined
cast
iron
water
mains
with
new
cement‐lined
duc3le
iron
pipe,
including
replacement
of
approx.
150
 lead
residen3al
and
commercial/industrial
serv Public
Works
Improvements
Program
Contract
2009‐S‐1
(Citywide
Sewer
Rehabilita3on).
Rehab
and/or
 replacement
of
approx.
12,500
LF
of
wastewater
collec3on
and
conveyance
piping
including
in‐situ
lining,
 replacement
of
structurally
deficient
vitrified
cla Replacement
of
approx.
1,000
lead
residen3al
and
commercial/industrial
service
connec3ons
with
new
copper
 tubing. Manhan
Rail
Trail
‐
2.4
miles

Project
Descrip3on

Northampton

MA

Streets/Roads

Northampton

MA

Northampton

Funding
Required

Jobs












1,750,000


34












3,500,000


44












3,500,000


44












7,000,000


88












7,200,000


90
















10,000


170










15,000,000


190










60,000,000


700












1,500,000


18












2,500,000


32












3,200,000


32












3,200,000


32












2,500,000


32












4,500,000


36












3,100,000


18

Hinckley
Street
Repaving












1,000,000


24

Streets/Roads

Milton
Street
Repaving












1,500,000


24

MA

Streets/Roads

Pavement
Management
‐
100
road
miles










15,000,000


30

Northampton

MA

Water

Slip
lining
sewer
mains












1,000,000


5

Northampton

MA

Water

Flood
Control
‐
Dike,
levee
and
pump
sta3on
upgrades














500,000


6

Northampton

MA

Water

Installa3on
of
Zinc
Orthophosphate
Chemical
Feed
at
Water
Treatment
Plant














700,000


8

Northampton

MA

Water

Repalcement
of
Sewer
Mains












4,000,000


10

Northampton

MA

Water

Upgrade
well
chlorina3on
equipment
at
two
wells














695,000


12

Northampton

MA

Water

Replace
Cast
Iron
and
Asbestos
Cement
Water
Mains
‐
20
miles












6,000,000


15

Quincy

MA

Streets/Roads

U3lity
and
Road
replacement
for
cross
town
connector












5,000,000


300

Quincy

MA

Water

Repair
Pump
Sta3ons
and
Water
Tanks














3,000,000


55

Quincy

MA

Water












9,000,000


150

Quincy

MA

Water

Implementa3on
of
a
city
wide,
fixed
radio,
Automated
Meter
Reading
System.

Project
includes
meters,
 transmifers,
sobware
and
antennas.
 Replacement
of
all
Water
Mains
that
are
75
years
or
older.











30,000,000


900

Woburn

MA

CDBG

Leland
Site
Remedia3on












3,000,000


20

Woburn

MA

Public
Safety

Main
Street
Corridor
Traffic
Signal
Upgrades












1,100,000


3

Woburn

MA

Public
Safety

Police
Sta3on
Roof
Replacement














350,000


8

Woburn

MA

Schools

Joyce
Middle
School
Roof
Replacement












1,250,000


8

Woburn

MA

Schools

Kennedy
Middle
School
Roof
Replacement












1,650,000


9

Woburn

MA

Schools

Plympton
School
Rehabilita3on












1,550,000


12

Woburn

MA

Streets/Roads

Magazine
Hill
Parking
Lot
Project












2,000,000


6

Woburn

MA

Streets/Roads

Main
Street
Roadway
andSidewalk
Reconstruc3on












2,400,000


8

Woburn

MA

Streets/Roads

Woburn
Bike
Loop
Project












1,610,000


8

Woburn

MA

Streets/Roads

Forest
Park
Cemetery
Project












4,200,000


9

Woburn

MA

Streets/Roads

Woburn
Public
Library
Addi3on










20,000,000


16

Woburn

MA

Water

Dix
Road
Private
Source
Removal














445,000


5

Woburn

MA

Water

Hart
Street
Drainage
Improvements












1,400,000


6

Woburn

MA

Water

Cleaning
and
Relining
Project
Year
4












1,400,000


8

Woburn

MA

Water

Watermain
Improvement
Project














310,000


8

Woburn

MA

Water

Dix
Road
Sewer
Pump
Sta3on
Rehabilita3on














969,000


9

Woburn

MA

Water

Residen3al
Water
Meter
Replacement
Project














550,000


10

Woburn

MA

Water

Area
3
Sewer
Rehabilita3on‐Repairs
to
30,000
b
of
sewer
mains












2,445,000


26

Woburn

MA

Water

Water
Treatment
Plant
Addi3on
and
Tank










24,500,000


37.5

Annapolis


MD

Energy

environmental
impact
programs












1,400,000


3

City

State

Program

Annapolis


MD

Energy

Annapolis


MD

Energy

annapolis
e
z...a
funding
program
for
residents
to
reduce
their
carbon
footprints
and
training
programs
to
meet
 new
green
technologies new
silver
led
recrea3on
center

Project
Descrip3on

Funding
Required

Jobs

Annapolis


MD

Public
Safety

911
technology

Annapolis


MD

Public
Safety

addi3on
of
emergency
opera3on
center
at
police
headquarters












8,000,000


6

Annapolis


MD

Public
Safety

undergrounding
of
u3lity
lines
in
the
historic
district










11,000,000


11

Annapolis


MD

Streets/Roads

sidewalk
improvement
along
all
city
streets‐annual
demand












1,000,000


4

Annapolis


MD

Streets/Roads

match
to
highway
user
funds
for
repair
and
maintenance
of
city
streets












1,800,000


10

Annapolis


MD

Transit

expand
sta3on
passenger
capacity
for
major
bus
transporta3on
terminus












1,200,000


3

Annapolis


MD

Transit

add
new
trolley
system
fromcounty
shopping
areas
to
center
of
historic
city












1,700,000


6

Annapolis


MD

Transit

expand
bus
maintence
capacity














750,000


10

Annapolis


MD

Water

stormwater
retrofits












5,000,000


2

Annapolis


MD

Water

nutrient
reduc3on
program














329,000


4

Annapolis


MD

Water

sewer
line
reconstruc3on












4,500,000


5

Annapolis


MD

Water

first
urban
watershed
plan
imploemented












3,200,000


7

Annapolis


MD

Water

2
wells
and
80
year
old
waterplant
reconstruc3on










23,000,000


18

Balitmore


MD

Public
Safety

Citywide
Traffic
Detector
Replacement












3,000,000


Balitmore


MD

Public
Safety

Electronic
Traffic
Devices
Communica3on

Enhancements
Communica3ons
for
Signals












2,000,000


Balitmore


MD

Public
Safety

Install
Data
Communica3ons
Equipment
for
traffic
management
Center
and
Field
Offices












2,000,000


Balitmore


MD

Public
Safety

Signal
Op3miza3on
‐
Phase
III












1,500,000


Balitmore


MD

Public
Safety

Traffice
Signal
Reconstruc3on
and
Rewiring












1,000,000


Balitmore


MD

Public
Safety

Variable
Message
Signs‐Replacement
and
installa3on
at
24
loca3ons












2,650,000


Balitmore


MD

Schools

#102
Thomas
G.
Hayes
Elem
Fire
Safety














350,000


4

Balitmore


MD

Schools

#13
Tench
Tilghman
ES/MS
Elevator
Renova3on














500,000


4

Balitmore


MD

Schools

#254
Mar3n
Luther
King
MS/HS
Fire
Safety














350,000


4

Balitmore


MD

Schools

#34
Roland
Park
ES/MS














500,000


4

Balitmore


MD

Schools

#181
Southside
Academy
HS
Science
Lab












1,000,000


7

Balitmore


MD

Schools

#403
Bal3morre
Polytechnic
Inst.
Locker
room
Renova3on













1,000,000


7

Balitmore


MD

Schools

#411
Walbrook
HS
Science
Lab












1,000,000


7

Balitmore


MD

Schools

#78
Harlem
Park
Science
Lab













1,000,000


7

Balitmore


MD

Schools

#215
Highlandtown
ES/MS
Fire
Safety












1,200,000


10

Balitmore


MD

Schools

#401
Northwestern
HS
Fire
Safety














900,000


10

Balitmore


MD

Schools

#419
Reginald
S.
Lewis
School
of
Business
Bldg.
science
Lab












2,000,000


14

Balitmore


MD

Schools

#170/424
Thurgood
Marshall
HS
Fire
Safety
and
Science
Lab












3,000,000


21

Balitmore


MD

Schools

#226
Violetville
Pre
K‐8
Renova3on/Addi3on










20,000,000


140

Balitmore


MD

Schools

#245
Leithwalk
Pre‐K
Renova3on/Addi3on










45,500,000


322

Balitmore


MD

Streets/Roads

Washington
Blvd
Streetscape












8,500,000


6

Balitmore


MD

Streets/Roads

Park
Heights
Avenue
Streetscape












2,400,000


17

Balitmore


MD

Streets/Roads

Southeast
Area
Intersec3on
Improvements












2,500,000


18

Balitmore


MD

Streets/Roads

Bridge
preventa3ve
maintenance












3,000,000


21

Balitmore


MD

Streets/Roads

Wilkens
Avenue
Bridge












6,300,000


44

Balitmore


MD

Streets/Roads

Sinclair
Lane
Bridge












6,500,000


46

Balitmore


MD

Streets/Roads

Argonne
Drive
Bridge












7,000,000


49

Balitmore


MD

Streets/Roads

Dundalk
Avenue
Streetscape










10,000,000


70

Balitmore


MD

Streets/Roads

Orleans
Street
Streetscape










10,600,000


74

Balitmore


MD

Streets/Roads

Northern
Parkway
Rehabilita3on










11,500,000


81

Balitmore


MD

Streets/Roads

Frederick
Avenue
Bridge










15,000,000


105

Balitmore


MD

Streets/Roads

Citywide
Resurfacing










30,000,000


210

Balitmore


MD

Water

Locust
point
Water
Wastewater
PS
Force
Main
Replacement













1,100,000


10

Balitmore


MD

Water

Chlorine
Dechlorina3on
Facili3es
Process
Conversion
at
PW
wastewater
treatment
plant












2,800,000


16

Balitmore


MD

Water

Primary
Sefling
Tanks
Rehabilita3on
Back
River
Waste
Water











15,000,000


105

Balitmore


MD

Water

Water
Infrastructure
Rehabilita3on










18,200,000


128

Balitmore


MD

Water

Chlorine
Disinfec3on










35,500,000


249

Balitmore


MD

Water

Montebello
Finished
Water
Reservoir
Improvements










50,000,000


350

Lewiston

ME

Airport

Reconstruc3on
of
East
Side
I3nerant
Apron














550,000


10

Lewiston

ME

Airport

Reconstruc3on
of
West
Side
I3nerant
Apron












1,900,000


10

Lewiston

ME

Airport

Reconstruc3on
of
5,000'
Main
Runway
(4/22)
which
is
18
years
old












2,500,000


15

Lewiston

ME

CDBG
















30,000


0

Lewiston

ME

CDBG

Re‐establishment
of
Sunnyside
Park
‐
City
Staff
and
Elected
Officials
have
been
Working
with
a
Local
 Neighborhood
Group
in
This
Regard,
as
the
Playground
is
in
a
State
of
Disrepair
and
Contains
Only
a
Single
 Working
Swing
Set.

 Establishment
of
Two
(2)
Dog
Parks
















50,000


2

Lewiston

ME

CDBG














105,000


3

Lewiston

ME

CDBG

For
New
Community
Center,
Employment
of
Three
Permanent
Employees
to
include
1
Recrea3on
Coordinator
 at
$40,000,
one
Recrea3on
Specialist
at
$35,000
and
one
support
person
at
$30,000. Ligh3ng
of
Municipal
Buildings














125,000


3.5

Lewiston

ME

CDBG

Lewiston

ME

CDBG

Kennedy
Park
Master
Plan
Implementa3on
‐
Comple3on
of
Pool
House
and
Expenses
Associated
with
the
 Installa3on
of

Playground
Equipment. Construc3on
of
Community
Center
(40
KSF)

Lewiston

ME

CDBG

Parking
Garage
Construc3on
(425+
cars)

Lewiston

ME

CDBG

Island
Point
Infrastructure
Improvement

Lewiston

ME

Energy

City
Buildings
Energy
Improvements












2,650,000


25










13,000,000


25














560,000


2














350,000


10












5,800,000


20












9,000,000


25












2,000,000


60














875,000


3

City

State

Program

Lewiston

ME

Energy

City
Buildings
Energy
Improvements
(Ligh3ng,
City
Hall
HVAC,
Mul3‐Purpose
Center
Window
Replacement)

Project
Descrip3on

Lewiston

ME

Energy

Municipal
Single
Stream
Sor3ng
Facility

Lewiston

ME

Housing

Lewiston

ME

Housing

Lewiston

ME

Lewiston

Funding
Required 












650,000


Jobs 3












8,000,000


37

Stairwell
Renova3ons
at
Elderly
Sites
















87,000


0.7

Smoke
Detector
Upgrades
at
All
Sites














153,000


1.3

Housing

Apartment
Kitchen
Renova3ons
at
Family
Sites














368,000


3

ME

Public
Safety
















30,000


0

Lewiston

ME

Public
Safety

Purchase
computers,
upgrades
to
exis3ng
computers
including
sobware,
upgrades
to
training
room
 equipment. Purchase
hardware,
sobware,
equipment,
and
furnishings
to
establish
offices.
















45,000


0

Lewiston

ME

Public
Safety
















67,540


1

Lewiston

ME

Public
Safety














135,080


2

Lewiston

ME

Public
Safety














135,080


2

Lewiston

ME

Public
Safety

Civil
Rights
Community
Rela3ons
Liaison
Officer
‐
To
hire
one
officer
to
be
the
liaison
for
between
the
police
 and
the
minority
community
and
various
cultures,
ethnic
groups,
etc.
to
assist
with
issues,
laws,
community
 percep3ons,
and
vic3miza3on. Hire
two
officers
to
work
full
3me
in
the
schools,
one
at
the
high
school
and
one
at
the
elementary
schools.
 Includes
wages
plus
benefits
for
two
officers. Livability/Nuisance
Enforcement
Officer
and
Fire
Inspector‐
These
individuals
would
work
with
various
state
 and
local
agencies
such
as
code
enforcement,
fire
department,
landlords,
and
tenants
to
enforce
livability
 issues
to
include
dilapidated
buildings, Two
Patrol
Officers














135,080


2

Lewiston

ME

Public
Safety

Public
safety
security
cameras

Lewiston

ME

Schools

Lewiston

ME

Lewiston

ME

Lewiston Lewiston














350,000


6

McMahon
School
HAVC
and
Window
Upgrade












1,800,000


30

Schools

Montello
School
HAVC
and
Renova3on
Project












2,500,000


50

Streets/Roads

Lisbon
Street
Light
Wiring
Replacement
















70,000


0.5

ME

Streets/Roads

Two
Sidewalk
Snowplows














200,000


2

ME

Streets/Roads

Beech
Street
Bridge
Replacement














500,000


3

Lewiston

ME

Streets/Roads

Replacement
of
Outdated
Street
Ligh3ng














400,000


3

Lewiston

ME

Streets/Roads

Design/Build
Par3al
Depth
Reconstruc3on
of
River
Road
from
South
Avenue
to
the
Maine
Turnpike












1,300,000


4

Lewiston

ME

Streets/Roads

Intersec3on
Improvements
at
East
Avenue
and
Russell
Street
and
East
Avenue
and
Bartlef/Pleasant
Streets














900,000


4

Lewiston

ME

Streets/Roads












1,500,000


5

Lewiston

ME

Streets/Roads

Design/Build
Par3al
Depth
Reconstruc3on
of
River
Road
from
the
Maine
Turnpike
to
Lewiston
Public
Works
 Ops
Center Sidewalk
Repair
and
Replacement












2,000,000


7

Lewiston

ME

Streets/Roads












2,600,000


8

Lewiston

ME

Streets/Roads

Complete
the
Lewiston
Riverside
Greenway
Bicycle
&
Pedestrian
Path
from
Main
Street
to
College
Street
to
 Include
a
Bridge
Across
Jepson
Brook Gendron
Drive/Priscilla
Drive
Extension
(Business
Park
Expansion)












2,000,000


8

Lewiston

ME

Streets/Roads

Full
Depth
Reconstruc3on
of
Local
Streets












3,000,000


10

Lewiston

ME

Streets/Roads

Maintenance
Paving
of
Local
Streets












3,000,000


10

Lewiston

ME

Streets/Roads












8,375,700


25

Lewiston

ME

Transit

Road
Rehabilita3on
‐
Switzerland
Road
(7,087
b.);
Cofon
Road
(11,006
b.);
River
Road
(7,788
b.);
Pond
Road
 (8,504
b.);
College
Street
(17,830
b.);
Crowley
Road
(3,623
b.) Purchase
a
Bus
Washer














500,000


1

Lewiston

ME

Transit

Purchase
3
Transit,
Fixed
Route
Buses












1,000,000


5

Lewiston

ME

Transit

Build
a
Passenger
Intermodal
Facility
at
the
Auburn‐Lewiston
Airport












5,000,000


50

Lewiston

ME

Water

Lake
Auburn
Watershed
Protec3on
Commission
(LAWPC)
Access
Management
Gate
















25,000


0.25

Lewiston

ME

Water

Hart
Brook
Watershed
Management
Projects
(Urban
Impaired
Stream)














200,000


1.5

Lewiston

ME

Water

Sewer
Pump
Sta3on
Upgrades














270,000


2.5

Lewiston

ME

Water














625,000


4

Lewiston

ME

Water

Lewiston‐Auburn
Water
Pollu3on
Control
(LAWPCA)
Treatment
Plant
Facili3es:
Repair
(Boilers
‐
$100K,
 Disinfec3on
System
Modifica3ons‐$300K,
Wet
Well
Ven3la3on‐$50K,
Compost
Facility
Air
Quality
Imp‐$175K Jepson
Brook
Watershed
CSO
Project












1,000,000


5

Lewiston

ME

Water

Drinking
Water
Meter
Replacement

Lewiston

ME

Water

Lewiston

ME

Water

Lewiston

ME

Lewiston














500,000


9

Jepson
Brook
Watershed
CSO
Separa3on
Project












2,200,000


10












2,430,000


12

Water

Lewiston‐Auburn
Water
Pollu3on
Control
Authority
(LAWPCA)
Repair
(Solid
Handling
Improvements
 $2,250,000,
Aera3on
Basin
Safety
Improvements
$80,000,
Plant
Doors
and
Windows
Replacement
$100,000) Rehabilita3on
&
Repair
of
Old
Sewer
Collec3on
Mains












2,000,000


13

ME

Water

Stormwater
Collec3on
System
Pipe
&
Channel
Repairs












2,800,000


16

Lewiston

ME

Water

Drinking
Water
Transmission
&
Distribu3on
Main
Pipe
Rehabilita3on
&
Repair












4,000,000


18

Lewiston

ME

Water










13,000,000


35

Lewiston

ME

Water

Combined
Sewer
Overflow
projects (Clean
Water
Act
Management
Plan) Canal
System
Rehabilita3on/Redesign












7,000,000


145

Portland

ME

Airport

Airport
terminal
apron












7,800,000


25

Portland

ME

Airport

Jetport
Terminal
expansion










66,000,000


50

Portland

ME

CDBG

Downtown
street
ligh3ng
program
(energy
efficient
ligh3ng
to
create
safe
neighborhoods)












1,000,000


6

Portland

ME

CDBG

Bayside
Trail
‐
construct
a
bike‐ped
trail















1,000,000


8

Portland

ME

CDBG

Deering
Oaks
Park
Pond improvements
to
address
pollu3on
and
algae
blooms,
restore
the
integrity
and
historic
appearance
of
the
 pond












2,500,000


8

Portland

ME

CDBG

Eastern
Promenade
‐
park
improvements















600,000


8

Portland

ME

CDBG












2,450,000


12

Portland

ME

CDBG

Fitzpatrick
Stadium
(serves
the
local
high
school
teams):ligh3ng
improvements
(replace
with
energy
efficient
 lights),
sea3ng,
and
turf
replacement Skateboard
Park
at
Dougherty
Field












2,000,000


12

Portland

ME

Energy

Police
Dept
‐
replace
windows
with
energy
efficient
ones

Portland

ME

Energy

Implement
the
first
phase
of
the
City's
energy
and
sustainability
program

Portland

ME

Public
Safety

Portland

ME

Public
Safety

Expansion
of
wireless
INET
‐
provide
backup
for
our
public
safety
radio
system
and
expand
wireless
availability
 within
the
City
to
provide
redundancy Police
Dept:
Computers
and
Technology
upgrades
and
replacement

















75,000


6












3,000,000


17














800,000


4














100,000


4

City

State

Program

Portland

ME

Public
Safety

Project
Descrip3on

Funding
Required

Jobs

Fleet
replacement: 12
frontline
cruisers 
2
SUV
supervisor
vehicles 
1
Replacement
for
the
Animal
Control
van,
which
is
very
old 
1
Replacement
for
the
Arrest
Van 












500,000


6

Fire
Dept
‐
construct
improved
berthign
space
for
safe
access
and
egress
by
the
Fire
Boat
which
serves
the
 public
safety
needs
of
the
mainland
and
Casco
Bay
Islands,
and
serves
as
an
integral
Homeland
Security
 resource Technology
upgrades
‐
implementa3on
of
technology
upgrades
in
all
schools,

computers
in
classrooms,
smart
 boards,
etc.












1,000,000


7












1,000,000


6

Streets/Roads

Neighborhood
street
and
sidewalk
projects













3,500,000


16

ME

Water

Combined
Sewer
Overflow
projects
(based
on
CSO
Master
Plan)










20,000,000


100

MI

Airport

New
Airport
electric
vault














600,000


25

Bafle
Creek

MI

Airport

South
Airport
Rd.
extension












1,500,000


30

Bafle
Creek

MI

Airport

Parallel
Runway
and
Taxiway
Construc3on












1,500,000


75

Bafle
Creek

MI

CDBG

Mass
grading
project
at
Airport












1,460,000


20

Bafle
Creek

MI

CDBG

Flood
Control
Channel
Improvements














500,000


40

Bafle
Creek

MI

CDBG

Hamblin
Ave.
Parking
Facility
Improvements














800,000


50

Bafle
Creek

MI

CDBG

Central
Business
District
Parking
Lot
Improvements
and
Rain
Gardens














850,000


60

Bafle
Creek

MI

Energy

Water
Plant
Wind
Turbine
(1
unit)












2,500,000


10

Bafle
Creek

MI

Energy

Wastewater
Wind
Turbines
(2
units)












5,000,000


20

Bafle
Creek

MI

Public
Safety

Mobile
Incident
Command
Center














400,000


5

Bafle
Creek

MI

Public
Safety

Police
Mobile
Data
Computers














200,000


5

Bafle
Creek

MI

Streets/Roads

Local
Street
Rehabilita3on
Program‐‐7.5
miles












4,200,000


50

Bafle
Creek

MI

Streets/Roads

Major
Street
Rehabilita3on
Program‐‐21
miles












6,600,000


50

Bafle
Creek

MI

Streets/Roads

Downtown
Riverwalk
Improvements












1,500,000


65

Bafle
Creek

MI

Transit

New
Full‐Sized
Hybrid
Bus














550,000


10

Bafle
Creek

MI

Transit

Intermodal
Facility
Improvements












1,125,000


60

Bafle
Creek

MI

Water

Water
Plant
Rehabilita3on














960,000


20

Bafle
Creek

MI

Water

Water
meter
reading
replacement
program












2,300,000


25

Bafle
Creek

MI

Water

Interceptor
Sewer
Rehabilita3on










10,975,000


30

Bafle
Creek

MI

Water

Wastewater
Pump
Sta3on
Replacement












3,000,000


40

Bafle
Creek

MI

Water

Sewer
Main
Rehabilita3on












3,375,000


50

Bafle
Creek

MI

Water

Skyline
Rd./I‐94
Water
and
Sewer
Extension












3,600,000


50

Bafle
Creek

MI

Water

Water
Main
Replacement












8,270,000


50

Bafle
Creek

MI

Water

Wastewater
treatment
plant
rehabilita3on












7,405,000


60

Bingham
Farms

MI

Streets/Roads


Fromm
Road
Reconstruc3on















230,000


6.4

Bingham
Farms

MI

Streets/Roads


Timber
Trail
Road
Reconstruc3on


Bingham
Farms Center
Line Center
Line Center
Line

MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads


Shagood
Road
Reconstruc3on
 Pavement
Patching
on
Various
Major
Streets City
Facility
PArking
Lot
Rehab
and
replacement Coolidge
Pavement
Patching,
Lawrence
to
Van
Dyke














245,000
 












250,000
 












300,000
 












350,000


6.8 6.9 8.3 9.7














450,000


12.5

Center
Line

MI

Streets/Roads

Harding
Street
Pavement
Replacement
(2
Blocks)














650,000


18.1

Center
Line

MI

Water

Open
Cut
Storm
Sewer
Repairs
















75,000


2.1

Center
Line

MI

Water

Sanitary
Seweer
manhole
Channel
&
Drop
Connec3on
Repairs














115,000


3.2

Center
Line

MI

Water

Gate
Valve
&
Well
Repair
program














150,000


4.2

Center
Line

MI

Water

Structural
repairs
to
Deteriorated
Sanitary
Sewers














200,000


5.6

Center
Line

MI

Water

Weigand
Water
Main
Replacement














215,000


6

Center
Line

MI

Water

Weingartz
Water
Main
Replacement














215,000


6

Center
Line

MI

Water

Helen
Water
Main
Replacement














325,000


9

Center
Line

MI

Water

Full
length
and
Secional
CIPP
Linings
to
Damaged
Storm
Sewers














500,000


13.9

Center
Line

MI

Water

Clean
&
CCTV
Storm
Sewer
System,
Evaluate
for
Repairs,
Capacity
Analysis














700,000


19.4

Clawson

MI

Streets/Roads


14
Mile
&
Guardian
Angels
Traffic
Signal
Replacement















125,000


3.5

Clawson

MI

Streets/Roads


14
Mile
&
Guardian
Angels
Traffic
Signal
Replacement


Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson

MI MI MI MI MI MI MI MI MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads


Crooks
Road
&
Elmwood
Traffic
Signal
Replacement
 
Rochester
Road
&
Goodale
Traffic
Signal
Replacement
 
14
Mile
&
Bellevue
Traffic
Signal
Replacement
 
14
Mile
&
Main
Street
Traffic
Signal
Replacement
 Main
Street
&
Walper
Traffic
Signal
Replacement 
N.
Stephen
Reconstruc3on
‐
School
to
Dreon
 
Langley
‐
School
to
Dead
End
 
Gargantua
Reconstruc3on
‐
Nakota
to
Massoit
 
S.
Manitou
Reconstruc3on
‐
Nakota
to
Massoit
 
Selfridge
Reconstruc3on
‐
Elmwood
to
Phillips
 
Various
Streets
‐
Road
Patching
 
Key
West
Drive
Reconstruc3on
‐
Badder
to
E.
City
limit















125,000
 












125,000
 












125,000
 












175,000
 












175,000
 












175,000
 












180,000
 












300,000
 












410,000
 












410,000
 












450,000
 












500,000
 












820,000


3.5 3.5 3.5 4.9 4.9 4.9 5 8.3 11.4 11.4 12.5 13.9 22.8

Portland

ME

Public
Safety

Portland

ME

Schools

Portland

ME

Portland Bafle
Creek

City

State

Program

Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Clawson Dearborn Dearborn Dearborn

MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water Water Water Water Water Water Water Water Amtrak CDBG CDBG


Council
Reconstruc3on
‐
N.
Custer
to
N.
Main
Street
 
Grant
Reconstruc3on
‐
Wilson
to
Rochester
Road
 
Dreon
Reconstruc3on
‐
Kenilworth
to
N.
Stephen
 
Kenilworth
Reconstruc3on
‐
Elmwood
to
Dreon
 
School
Reconstruc3on
‐
Langley
to
N.
Bywood
 
N.
Selfridge
Reconstruc3on
‐
Elmsford
to
Maple
 
N.
Bywood
Reconstruc3on
‐
Park
Drive
to
Maple
 
Broadacre
Reconstruc3on
‐
N.
Crooks
to
N.
Bywood
 
Phillips
Reconstruc3on
‐
Bywood
to
Main
Street
 
Elmwood
Reconstruc3on
‐
Crooks
to
Rochester
Road
 
Washington
Water
Main
Loop
‐
John
M
to
Phillips
 
N.
Marias
Water
Main
Replacement

‐
Broadacre
to
Phillips
 
N.
Custer
Water
Main
Replacement
‐
Council
to
Maple
 
Bowers
Water
Main
Replacement

‐
Rochester
to
14
Mile
Road
 
Fisher
Court
Water
Main
Replacement
‐
Main
Street
to
Boschma
 
Bauman
Water
Main
Replacement
‐
Rochester
to
Bellevue
 
W.
14
Mile
Water
Main
Replacement
‐
Bellevue
to
Rochester
Road
 
S.
Main
Water
Main
Replacement
‐
Gardner
to
Bauman
 Broadacre
Water
Main
Replacement
‐
Main
Street
to
N.
Bywood 
S.
Rochester
Water
Main
Replacement

‐
14
Mile
to
Bauman
 
Maple
Water
Main
Replacement
‐
Langley
to
N.
Custer
 
Line
or
Replace
Deteriorated
Sanitary
Sewers
 Dearborn
Amtrak
Sta3on
&
Plazorm
Reloca3on Containerized
Trash
collec3on Watermain
replacement
and
asphal
resurfacing
of
Yinger
Street
from
Donald
to
Warren
Avenue

Project
Descrip3on

Funding
Required 












870,000
 












910,000
 












940,000
 












950,000
 










1,100,000
 










1,120,000
 










1,200,000
 










1,550,000
 










1,550,000
 










3,000,000
 












130,000
 












140,000
 












160,000
 












230,000
 












390,000
 












420,000
 












480,000
 












510,000
 












610,000
 












670,000
 












800,000
 










7,000,000
 










2,500,000
 












300,000


Jobs 24.2 25.3 26.1 26.4 30.6 31.1 33.3 43.1 43.1 83.3 3.6 3.9 4.4 6.4 10.8 11.7 13.3 14.2 16.9 18.6 22.2 194.4 30 3

Dearborn

MI

CDBG

Dix
Avenue
Streetscape












1,000,000


10












1,500,000


Dearborn

MI

Energy

15

Photovoltaic
Panels
for
Henry
Ford
Community
College














500,000


Dearborn

MI

2

Energy

Hybrid
Vehicles
for
City
Fleet
(25
vehicles)














625,000


Dearborn

3

MI

Energy

Green
Housing
Rehabilita3on
(30
homes)












1,000,000


10

Dearborn

MI

Energy

LED
Downtown
Street
Light
Retrofit












2,000,000


10

Dearborn

MI

Energy

East
Dearborn
On‐Site
Power
Genera3on












3,000,000


15

Dearborn

MI

Energy

Wind
Turbines
for
Rouge
River
Gateway












5,000,000


25

Dearborn

MI

Energy

East
Dearborn
Green
Zone
(Town
Center/City
Hall
Campus)












6,000,000


30

Dearborn

MI

Housing

Window
Replacement












1,050,405


35

Dearborn

MI

Public
Safety

Ballis3c
Armor
(vests)
80
vests
@
$500.00
















40,000


Dearborn

MI

Public
Safety

IT
Specialist
(full‐3me)
















80,500


Dearborn

MI

Public
Safety

Patrol
Rifles

5
@
$1,100.00

Dearborn

MI

Public
Safety

TASERS

5
@
$810.00

Dearborn

MI

Public
Safety

Training
Room
A/V
upgrade
















20,000


Dearborn

MI

Public
Safety

Technology
upgrad‐digital
dicta3on
voice
recogni3on














250,000


0

Dearborn

MI

Public
Safety

45
Mobile
Data
Computers
‐
Police
Vehicles














300,000


5

Dearborn

MI

Streets/Roads

Brewster
‐
Middlebury
to
Andover














244,955


Dearborn

MI

Streets/Roads

Elmwood
‐
Fordson
to
Cherry
Hill














331,141


Dearborn

MI

Streets/Roads

Elmwood
Ct.
‐
Fordson
to
Fordson














118,928


Dearborn

MI

Streets/Roads

Fort
Dearborn
‐
Cherry
Hill
to
Kensington














268,552


Dearborn

MI

Streets/Roads

Lapham
‐
Michigan
Avenue
to
Prospect














207,900


Dearborn

MI

Streets/Roads

Lincoln
Street
‐
Carlysle
to
Madison














389,670


Dearborn

MI

Streets/Roads

Lodge
Lane
‐
Telegraph
to
Outer
Drive














551,100


Dearborn

MI

Streets/Roads

Long
Meadow
‐
Eastham
to
Greenfield














328,500


Dearborn

MI

Streets/Roads

Marshall
‐
Telegraph
to
Outer
Drive














359,800


Dearborn

MI

Streets/Roads

McKinley
Street
‐
Carlysle
to
Madison














393,145


Dearborn

MI

Streets/Roads

Rockford
‐
Telegraph
to
Melborn














232,450


Dearborn

MI

Streets/Roads

Roosevelt
Street
‐
Carlysle
to
Madison














400,830


Dearborn

MI

Streets/Roads

Rosevere
‐
Marshall
to
Cherry
Hill














104,280


Dearborn

MI

Streets/Roads

Rowe
‐
Highland
to
Elmwood














100,220


Dearborn

MI

Streets/Roads

S.
Martha
‐
Marshall
to
Cherry
Hill
















75,000


Dearborn

MI

Streets/Roads

S.
Melborn
‐
Fordson
to
Cherry
Hill














255,000


Dearborn

MI

Streets/Roads

S.
York
‐
Fordson
to
Cherry
Hill














211,760


Dearborn

MI

Streets/Roads

Sterling
Place
‐
Highland
to
Elmwood
















93,920


Dearborn

MI

Streets/Roads

Waverly
‐
Fordson
to
Cherry
Hill














343,440


Dearborn

MI

Streets/Roads

Woodland
‐
Eastham
to
Middlebury

Dearborn

MI

Transit

Refurbish
Regional
Commuter
Rail
Cars
(12
cars)












6,000,000


30

Dearborn

MI

Transit

Dearborn
Intermodal
Rail
Passenger
Sta3on
(14,000
s.f.)










21,400,000


107

Dearborn

MI

Water

Barrie‐Warren
to
Morross














275,000


Dearborn

MI

Water

Elmwood
Ct.‐Fordson
to
Fordson














120,000


Dearborn

MI

Water

Elmwood‐Fordson
to
Cherry
Hill














331,200


Dearborn

MI

Water

Leonard‐Maple
to
Irving














180,000


Dearborn

MI

Water

Marshall‐Telegraph
to
Outer
Drive














359,800


Dearborn

MI

Water

Monroe‐Dartmouth
to
Madison














420,000


Dearborn

MI

Water

Moross‐Yinger
to
Chase














350,000


Dearborn

MI

Water

Morross‐Wyoming
to
Wisconsin














157,500


Dearborn

MI

Water

Rockford‐Telegraph
to
Melborn














232,450


















5,500
 















4,050















279,000


City

State

Program

Dearborn

MI

Water

Rosevere‐Marshall
to
Cherry
Hill

Project
Descrip3on

Funding
Required 












111,750


Jobs

Dearborn

MI

Water

Rowe‐Highland
to
Elmwood














107,400


Dearborn

MI

Water

S.
Martha‐Marshall
to
Cherry
Hill
















75,000


Dearborn

MI

Water

S.
Melborn‐Fordson
to
Cherry
Hill














255,000


Dearborn

MI

Water

S.
York‐Fordson
to
Cherry
Hill














211,800


Dearborn

MI

Water

Sterling
Place‐Highland
to
Elmwood














100,650


Dearborn

MI

Water

Waverly‐Fordson
to
Cherry
Hill

Dearborn
Heights

MI

CDBG

New
Recrea3on
Center

Dearborn
Heights

MI

Energy

Street
Ligh3ng

Dearborn
Heights

MI

Energy

DPW
Facility
Improvements












1,000,000


20

Dearborn
Heights

MI

Energy

Build
Canfield
Recrea3on
Center










25,000,000


125

Dearborn
Heights

MI

Housing

Local
Community
Centers












1,000,000


25

Dearborn
Heights

MI

Public
Safety

City
Hall
Renova3ons












2,500,000


20

Dearborn
Heights

MI

Streets/Roads

Major
Street
Rehabilita3on












1,500,000


20

Dearborn
Heights

MI

Streets/Roads

Local
Street
Rehabilita3on












6,250,000


50

Dearborn
Heights

MI

Water

River
Oaks
Stormwater
Pond
Restora3on














750,000


10

Dearborn
Heights

MI

Water

10
Miles
Sewer
Main
Replacement












8,000,000


50

Dearborn
Heights

MI

Water

10
Miles
Water
Main
Replacement












9,500,000


50

Dearborn
Heights

MI

Water

CSO
Control
URT
Project










11,000,000


75

Dearborn
Heights

MI

Water

CSO
Control
Lower
Rouge










15,000,000


100

Detroit

MI

Airport

Airport
upgrades
and
acquisi3ons








106,500,000


50

Detroit

MI

CDBG

Infec3ous
disease
outreach














350,000


2

Detroit

MI

CDBG

Interven3on
programs














250,000


2

Detroit

MI

CDBG

Perven3on
programs
dealing
with
nuitri3on
educa3on,
obesity
and
other
childhood
diseases














400,000


2

Detroit

MI

CDBG

Technology
upgrades
‐
Public
health












2,000,000


3

Detroit

MI

CDBG

Remove
40,000
dead
ash
and
sliver
maple
trees












4,000,000


5

Detroit

MI

CDBG

Capital
projects
for
Parks
and
recrea3on










32,300,000


10

Detroit

MI

CDBG

Reconstruc3on/resurfacing
of
150
miles
of
major
roadway
throught
the
city.










75,000,000


50

Detroit

MI

Energy

Remote
meter
reading












1,250,000


2

Detroit

MI

Energy

Installa3on
of
2
60
MVA
Turbine
Generators










85,000,000


3

Detroit

MI

Energy

24000V
to
4800vDistribu3on
Sys
Conversion










15,450,000


5

Detroit

MI

Energy

Conversion
and
upgrading
of
mercury
vapor
series
fed
street
lights
to
sodium
vapor
mul3ple
street
lights










88,000,000


5

Detroit

MI

Energy

Relay
Replacement
Program












4,300,000


5

Detroit

MI

Energy

Traffic
Signal
Feed
Upgrades












5,200,000


5

Detroit

MI

Energy

Upgrades
to
municipal
center
to
adopt
"green"
opera3onal
ini3a3ves










45,000,000


600

Detroit

MI

Streets/Roads

Riopelle
Park,
open
space
improvements














350,000


4

Detroit

MI

Streets/Roads

Pedestrian
bridge
over
M‐8,
paint
deck
patch














400,000


5

Detroit

MI

Streets/Roads

HMA
crack
seal














500,000


6

Detroit

MI

Streets/Roads

3
railroad
bridges,
substructure
repair














700,000


7

Detroit

MI

Streets/Roads

Capitol
Park,
open
space
improvements














600,000


7

Detroit

MI

Streets/Roads

Removal
of
railroad
structure














640,000


7

Detroit

MI

Streets/Roads

Construct
and
install
internally
illuminated
street
name
signes
at
25
loca3ons
in
the
downtown














500,000


10

Detroit

MI

Streets/Roads

Install
new
pedestrain
crosswalks
in
the
downtown
area














500,000


10

Detroit

MI

Streets/Roads

Detec3on
system
replacement,
100
sites












1,000,000


13

Detroit

MI

Streets/Roads

Second,
Hamilton,
Woodward,
John
R,
Epoxy
Overlay












1,400,000


20

Detroit

MI

Streets/Roads

Paradise
Valley,
Streetscape
and
open
space
improvements












2,500,000


22

Detroit

MI

Streets/Roads












2,500,000


22

Detroit

MI

Streets/Roads

Vinewood
Universal
Crossover
‐
CN, Reduce
railroad
conges3on
and
emissions
and
construct
universal
crossover Design
plaza
ramp
and
local
ramp
work












1,270,000


30

Detroit

MI

Streets/Roads

I‐94,
ITS
Expansion












4,430,000


30

Detroit

MI

Streets/Roads

Schaefer
Highway,
pump
sta3on












1,260,000


30

Detroit

MI

Streets/Roads

7
bridges
over
M‐39,
superstructure
repair












1,200,000


32

Detroit

MI

Streets/Roads

Milwaukee
pump
sta3on












1,350,000


32

Detroit

MI

Streets/Roads

Seldon
pump
sta3on












1,350,000


32

Detroit

MI

Streets/Roads

Woodingham
pump
sta3on













1,350,000


32

Detroit

MI

Streets/Roads

Dequindre
Trail,
Non‐motorized
greenway












1,000,000


35

Detroit

MI

Streets/Roads

Jefferson
outlet,
pump
sta3on












2,200,000


35

Detroit

MI

Streets/Roads

1
bridge
over
I‐94,
deck
replacement












1,500,000


40

Detroit

MI

Streets/Roads

45
MPH
Crossover,
reduce
railroad
conges3on
and
emissions,
construct
crossover 










2,700,000


40

Detroit

MI

Streets/Roads

Joseph
Campau
over
M‐8,
paint,
deck
patch

Detroit Detroit

MI MI

Streets/Roads Streets/Roads

2
bridges
over
M‐39,
1
superstructure
repair
and
1
deck
replacement 3
bridges
over
I‐94,
substructure
repair
and
repain3ng












2,100,000
 










3,000,000


42 45












3,000,000


45

Detroit

MI

Streets/Roads

Goddard
over
M‐8,
deck
replacement












2,500,000


45

Detroit

MI

Streets/Roads

Track
upgrade,
reduce
railroad
conges3on
and
emissions;
replace
3es
and
rail
primarliy
on
Main
2












3,000,000


45

Detroit

MI

Streets/Roads

3
bridges
over
I‐96,
deck
replacement












3,892,000


50

Detroit

MI

Streets/Roads

5
bridges
over
M‐39,
CPM












4,000,000


50

Detroit

MI

Streets/Roads












2,000,000


50

Detroit

MI

Streets/Roads

Improve
traffic
safety
by
retrofiqng
pedestrian
traffic
signals
with
countdown
3mes
and
push
bufons
at
100
 intersec3ons Reconstruc3on/Rehabilita3on
of
11
vehicular
and
pedestrian
bridges
throught
Detroit.










17,000,000


50














343,500
 








13,500,000


91














500,000


10

City

State

Program

Detroit

MI

Streets/Roads

Crossover
at
West
Detroit,
reduce
railroad
conges3on
and
emissions
and
construct
universal
crossover

Project
Descrip3on

Funding
Required 










4,500,000


Jobs 55

Detroit

MI

Streets/Roads

Detroit

MI

Streets/Roads

Lower
Woodward
Cross
Streets,
streetscape












3,300,000


60

Atwater,
Orleans,
Riopelle,
riverfront
development
and
infrastructure












5,000,000


Detroit

MI

70

Streets/Roads

4
bridges
over
M‐39,
4
deck
replacements












7,000,000


Detroit

80

MI

Streets/Roads

Device
upgrade












7,000,000


80

Detroit

MI

Streets/Roads

DMS
Replacement
‐
35
signs












7,000,000


80

Detroit

MI

Streets/Roads

Dock
and
terminal
project,
addi3onal
phases












8,783,093


95

Detroit

MI

Streets/Roads

5
bridges
over
I‐94,
3
deck
replacements
and
2
deck
patch













8,500,000


100

Detroit

MI

Streets/Roads

5
bridges
over
M‐39,
3
super
replacements
and
2
deck
replacements










10,000,000


125

Detroit

MI

Streets/Roads

US‐24
to
I‐275,
bridge
CPM










10,000,000


125

Detroit

MI

Streets/Roads

7
bridges
over
I‐96,
deck
replacement










12,412,000


190

Detroit

MI

Streets/Roads

6
bridges
over
M‐39,
1
super
replacement
and
5
deck
replacements










14,800,000


200

Detroit

MI

Streets/Roads

Construct
Rosa
Parks
Integrated
Campus










11,800,000


220

Detroit

MI

Streets/Roads

Sanders,
Pleasant
and
NS
RR,
3
bridge
replacements










18,000,000


220

Detroit

MI

Streets/Roads

M‐85
Sibley
to
Goddard,
reconstruct










57,250,000


600

Detroit

MI

Transit

Capital
Assets










13,000,000


2

Detroit

MI

Transit

Bus
stop
improvements












3,000,000


5

Detroit

MI

Transit

Communica3ons
equipment










39,000,000


5

Detroit

MI

Transit

Facility
improvements
and
upgrades










61,000,000


25

Detroit

MI

Transit

New
Bus
Acquisi3ons










15,000,000


50

Detroit

MI

Transit

Ann
Arbor
to
Detroit,
passenger
rail,
rail
coach
and
cab
car
purchase
and
rehabilita3on
for
passenger
service












6,000,000


80

Detroit

MI

Transit

Construct
administra3on
facility
‐
Rosa
Parks
Transporta3on
Center










18,000,000


220

Detroit

MI

Water

Upgrades
to
Upper
Rouge
Tunnel
CSO
Control
Project








270,600,000


1200

Dexter

MI

Energy

Conversion
of
Main
Street
streetlights
to
LED
















80,000


6

Dexter

MI

Streets/Roads

Rehabilita3on
of
Dexter‐Ann
Arbor
Road
from
Meadowview
to
Main
Street












1,000,000


7

Dexter

MI

Streets/Roads

Widen
and
reconstruct
Jeffords
and
Forest












1,000,000


7

Dexter

MI

Streets/Roads

Reconstruc3on
of
Central
Street












2,000,000


13

Dexter

MI

Streets/Roads

Installa3on
of
roundabout
at
Main
and
Dexter‐Chelsea










10,000,000


36

Dexter

MI

Water

Rehabilitate
sanitary
sewer
system












1,000,000


7

Dexter

MI

Water

Construc3on
of
emergency
storage












1,300,000


8

Dexter

MI

Water

Fibh
Well
Development
and
Transmission
Mains












1,300,000


8

Dexter

MI

Water

Upgrade
exis3ng
4
inch
cast
iron
water
mains
to
8
inch
duc3le
iron
water
mains












2,500,000


16

Dexter

MI

Water

Construc3on
of
400,000
gallon
equaliza3on
basin












2,545,000


17

Eastpointe

MI

CDBG

Library
Parking
Lot
Reconstruc3on














550,000


15.3

Eastpointe

MI

Streets/Roads

9
Mile
Road
Joint
Sealing
‐
Kelly
Road
to
West
City
Limits














125,000


3.5

Eastpointe

MI

Streets/Roads

Juliana
Avenue
Reconstruc3on
‐
David
to
Kelly














215,000


6

Eastpointe

MI

Streets/Roads

SB
Kelly
Road
Reconstruc3on
‐
Norton
to
9
Mile














300,000


8.3

Eastpointe

MI

Streets/Roads

SB
Kelly
Road
Resurfacing
‐
Stephens
to
Norton














345,000


9.6

Eastpointe

MI

Streets/Roads

Hayes
Road
Resurfacing
‐
9
Mile
to
Stephens














850,000


23.6

Eastpointe

MI

Streets/Roads

SB
Kelly
Road
Reconstruc3on
‐
Toepfer
to
8
Mile
Road












1,200,000


33.3

Eastpointe

MI

Water

Cushing
Ave
Water
Main
Replacement
‐
9
Mile
to
Stephens














400,000


11.1

Eastpointe

MI

Water

Wilmot
Water
Main
Replacement
‐
Stephens
to
10
Mile














400,000


11.1

Eastpointe

MI

Water

Kelly
Road
and
8
Mile
Meter/PRV
Pit














550,000


15.3

Eastpointe

MI

Water

Gra3ot
and
8
Mile
Meter/PRV
Pit














600,000


16.7

Eastpointe

MI

Water

10
Mile
Road
Water
Main
Replacement
‐
Gra3ot
to
Flower














700,000


19.4

Eastpointe

MI

Water

Water
Reservior
Upgrades












1,300,000


36.1

Eastpointe

MI

Water

Line
or
Replace
Deteriorated
Sanitary
Sewers












5,500,000


152.8

Flint

MI

Public
Safety

Implement
a
improved
Safety
Signal
at
12th
St.
and
Ballenger
Hwy.

And
Miller
Road
and
Ballenger
Hwy.















170,000


15

Flint

MI

Public
Safety














855,000


25

Flint

MI

Public
Safety

Implement
and
construct
a
total
new
safety
design
intersec3on
at
two
City
of
Flint
street
intersec3ons.

 Pasadena/Dupont
and
Pasadena/Freemont
loca3ons. Repair
the
"Main"
Street
Bridge
in
the
City
of
Flint.

Saginaw
Street
Bridge
as
part
of
the
Flint
River
Restora3on.














900,000


30

Flint

MI

Public
Safety

Repair
the
Kearsley
Park
Blvd
Motorized
Vehicle
Traffic
Bridge
that
crosses
over
Gilkey
Creek.














900,000


30

Flint

MI

Public
Safety












1,400,000


35

Flint

MI

Public
Safety

Implement
the
newly
designed
traffic
route
for
the
en3re
City
of
Flint
Downtown
area.
Fourteen
(14)
 intersec3ons
are
involved
in
the
redesign.
This
improvement
will
improve
pedestrian
and
vehicle
safety.
 Repair
the
Robert
T.
Longway
Motorized
Vehicle
Bridge
that
crosses
over
Thread
Creek.














1,200,000


35

Flint

MI

Public
Safety

Repair
the
S.
Grand
Traverse
Motorized
Vehicle
Bridge
that
crosses
over
Thread
Creek.














1,300,000


35

Flint

MI

Public
Safety

Repair
the
South
Grand
Traverse
Motorized
Traffic
Bridge
that
crosses
over
Thread
Creek.













1,300,000


35

Flint

MI

Public
Safety

Repair
the
Fenton
Road
Motorized
Vehicle
Traffic
Bridge
that
crosses
over
Thread
Creek.














1,900,000


40

Flint

MI

Public
Safety

Repair
the
W.
Second
Street
Motorized
Vehicle
Bridge
that
crosses
over
Swartz
Creek.












3,400,000


60

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
W.
Second
St.
from
Grand
Traverse
to
Harrison
Rd.















300,000


15

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
W.
Second
Street
from
Chase
St.
to
Grand
Traverse.














400,000


20

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
W.
Stewart
Ave
from
Clio
Road
to
Dupont
Street.














400,000


20

Flint

MI

Streets/Roads












1,100,000


30

Flint

MI

Streets/Roads












1,200,000


30

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"

Chevrolet
Ave.

From
Chevrolet
Bridge
past
Kefering
University
to
 University
Ave.
 Paving
of
"Key
Infrastructure
Roadway"

Chevrolet
Connector
from
Hammerberg
Rd.
to
Chevrolet.

This
is
a
 cri3cal
upgrade
to
improve
the
Kefering
Enterence
off
I‐69. Paving
of
"Key
Infrastructure
Roadway"
Clio
Road,
from
W.
Stewart
Ave.
to
Pierson
Road














800,000


30

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
Glenwood
Ave.
from
Court
St.
to
Stevenson
St.















500,000


30

City

State

Program

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
Lippencof
Blvd.
from
Burr
Blvd
to
Averill
St.

Project
Descrip3on

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
MLK‐W.
Pierson
Rd.to
Carpenter
Rd.

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
West
12th
Street
from
Hammerberg
to
Fenton
Road

Flint

MI

Streets/Roads

Flint

MI

Streets/Roads

The
City
of
Flint
and
Genesee
County
Planning
Commission
have
completed
engineering
plans
for
construc3on
 of
the
Genesse
Valley
Trailway.

River
Bank
Park
to
City
Limits. Paving
of
"Key
Infrastructure
Roadway"
Industrial
St.
from
Stewart
to
Hamilton
Ave.

Flint

MI

Streets/Roads

Paving
of
"Key
Infrastructure
Roadway"
Iroquois
St.
from
Pasadena
to
Welch
Blvd.












2,500,000


40

Flint

MI

Streets/Roads












1,300,000


60

Flint

MI

Streets/Roads

Exci3ng
News!
The
City
of
Flint
and
Genesee
County
Planning
Commission
have
completed
engineering
plans
 for
the
construc3on
of
The
Grand
Traverse
GreenWay.

 Paving
of
"Key
Infrastructure
Roadway"
Flint
River
to
Pierson
Road.












6,300,000


130

Flint

MI

Water

Flint

MI

Water












2,000,000


20

Flint

MI

Water

Construct
and
fabricate
a
new
water
buster‐sta3on
at
Torrey
Road
in
the
City
of
Flint.

This
a
signifcant
priority
 for
the
City.

This
is
necessary
to
insure
the
func3oning
at
a
General
Motors
manufacturing
facility
and
a
large
 local
neighborhood
and
co Utah
Dam
removal
and
fabrca3on
and
construc3on
of
a
pedestrian
bridge.












1,300,000


35

Flint

MI

Water










25,000,000


50

Flint

MI

Water










15,000,000


50

Flint

MI

Water












3,000,000


50

Flint

MI

Water












6,000,000


75

Fraser

MI

Streets/Roads














660,000


19

Fraser

MI

Streets/Roads

Asphalt
Road
Rehabilita3on‐
College
Blvd,
Caroline
St,
Callahan,
Leota
St,
Park
Ln,
Depot
Rd
and
various
 loca3ons

Fraser

MI

Streets/Roads

Concrete
Road
Rehabilita3on‐
Various
Loca3ons

Fraser

MI

Water

Rainbow
Water
Main‐
Eveningside
to
Slumber














300,000


9

Fraser

MI

Water

14
Mile
Water
Main
Replacement‐
Edgegrove
to
Garfield














400,000


12

Fraser

MI

Water

14
Mile
Water
Main
Replacement‐
Garfield
to
Fraser














400,000


12

Fraser

MI

Water

Breezeway
Water
Main‐
Eveningside
to
Kelly














410,000


12

Fraser

MI

Water

Calahan
Drain
Improvements














400,000


12

Fraser

MI

Water

U3ca
Road
Water
Main‐
14
Mile
to
Groesbeck












1,000,000


28

Fraser

MI

Water

Water
System
Reservoir












2,500,000


70

Fraser

MI

Water

Hayes
Masonic
Sanitary
Interceptor‐
Beacon
Lane
to
15
Mile










12,000,000


334

Grand
Rapids

MI

CDBG

Garfield
Sewer
Line
Connec3on
















45,000


1

Grand
Rapids

MI

CDBG

Farmer's
Market
Improvements














100,000


2

Grand
Rapids

MI

CDBG

Ah‐Nab‐Awen
Renova3ons














750,000


10

Grand
Rapids

MI

CDBG














750,000


10

Grand
Rapids

MI

CDBG

Joe
Taylor
Park
Improvements Park
expansion
and
development
in
conjunc3on
with
CSO
improvements. Veteran's
Memorial
Park
Improvements














750,000


10

Grand
Rapids

MI

CDBG

Garfield
Pool/Bath
House
Demoli3on














915,000


15

Grand
Rapids

MI

CDBG

Various
Park
Loca3ons
Paving
Repairs












1,000,000


20

Grand
Rapids

MI

CDBG

Fulton
Street
Farmers
Market
Expansion












3,000,000


55

Grand
Rapids

MI

CDBG

Community
Archives
and
Record
Center
(CARC)
Improvements












5,441,400


80

Grand
Rapids

MI

Energy

Energy
conserva3on
Parking
‐
New
Equipment
and
Equipment
replacement














250,000


5

Grand
Rapids

MI

Energy

Grand
Rapids

MI

Energy

City
Hall
Ligh3ng
Upgrade:
The
majority
of
the
exis3ng
ligh3ng
system
is
4
foot
fluorescent
lamp
system
with
a
 T12
magne3c
ballast.

This
system
would
be
replaced
with
a
new
energy
efficient
T8
fixture
with
an
electronic
 ballast
along
with
a
ligh3ng
 Government
Buildings
‐
Energy
efficiency
improvements
and
retrofits

Grand
Rapids

MI

Energy

Grand
Rapids

MI

Grand
Rapids

Update
the
City
of
Flint
Water
Plant
to
func3on
as
a
stand
alone
water
purifaca3on
and
distribu3on
plant
(Flint
 River
the
water
source). Update
the
City
of
Flint
Water
Plant
to
func3on
as
a
stand
alone
water
purifaca3on
and
distribu3on
plant(Lake
 Huron
water
source). Update
the
infrastructure
of
the
water
pumping
system
for
the
en3re
City
of
Flint
River
Bank
Park.

Include
 habitate
restora3on
and
enhanced
fish
passage Hamilton
Dam
removal
and
rock
rapid
crea3on.

Fishery
restora3on
on
the
Flint
River.

Flood
protec3on
 remaining.
 Fabri
Dam
removal
and
rock
rapid
design.

Fish
passage
and
flood
protec3on
included. Mulvey
Road
Resurfacing‐
14
Mile
to
U3ca

Funding
Required 












900,000


Jobs 30












1,300,000


30














920,000


30














600,000


35












2,100,000


40














750,000


21












5,000,000


139














400,000


8












2,000,000


20












1,200,000


22

Energy

City
Hall
Glazing
Replacement:
The
exis3ng
building
glazing
is
a
1/4
inch
single
pane
covered
by
window
 screens
on
3
sides.

There
is
approximately
31,000
square
feet
of
glazing.

This
project
would
remove
the
 exis3ng
glazing
and
window
screens
and
repl Energy
efficiency
‐
homes
retrofit












3,000,000


30

MI

Energy

Government
Buildings
‐
On
site
wind
power
projects












2,500,000


40

Grand
Rapids

MI

Energy

Government
Buildings
‐
On
site
Solar
Panel
Projects












5,000,000


75

Grand
Rapids

MI

Public
Safety

Parking
Security
Infrastructure
upgrade
and
Energy
conserva3on















120,000


3

Grand
Rapids

MI

Public
Safety

Improvements
to
the
Police
Department
firearms
range















500,000


10

Grand
Rapids

MI

Public
Safety

Neighborhood‐based
Crime
Preven3on
‐
Community
Development

Grand
Rapids

MI

Public
Safety

US‐131
Westside
Embankment
Upgrade


Grand
Rapids

MI

Schools

Grand
Rapids

MI

Grand
Rapids














650,000


10












2,908,528


60

GRPS
North
Park
Elementary
‐
Renova3ons














490,000


10

Schools

GRPS
Aberdeen
Elementary
‐
Renova3ons















705,000


15

MI

Schools

GRPS
Blandford
‐
Replacement
of
Portables
with
Structure












2,250,000


45

Grand
Rapids

MI

Schools

GRPS
C.A.
Frost
‐
Replacement
of
Portables
with
Structure












2,250,000


45

Grand
Rapids

MI

Schools










10,700,000


210

Grand
Rapids

MI

Schools

Grand
Rapids
Public
Schools
(GRPS) Stocking
Elementary
‐
Reconstruc3on GRPS
Congress
‐
Public
School
Major
Renova3on










13,500,000


225

Grand
Rapids

MI

Schools

GRPS
City
High‐Middle
School
‐
Major
renova3on










14,700,000


250

City

State

Program

Grand
Rapids

MI

Streets/Roads

Parking
lot
construc3on
for
economic
development
and
infrastructure
development
‐
Diamond
Parking
lot


Project
Descrip3on

Grand
Rapids

MI

Streets/Roads

Paving
Repairs
‐
Removal
and
replacement
of
paved
lots
and
drives
that
are
beyond
maintenance
efforts.

 Sec3ons
of
roadways
and
parking
lots
at
Riverside,
Richmond
and
Garfield
parks,
cemeteries
and
Fulton
 Market.

Grand
Rapids

MI

Streets/Roads

Government
Center
Ramp,
Snow
Melt
Replacement


Grand
Rapids

MI

Streets/Roads

Grand
Rapids

MI

Streets/Roads

Plaster
Creek
Walkway
Retaining
Wall
near
Kroc
Center
‐
Construc3on
of
a
retaining
wall
and
walkway
on
City
 property
adjacent
to
Plaster
Creek
which
will
allow
for
a
future
non‐motorized
trail
connec3on
into
the
City
of
 Wyoming
and
eventually
to
Kent
Re Plaster
Creek
Trail
‐
Division
Avenue
‐
Grand
Rapids/Wyoming
Connector

Grand
Rapids

MI

Streets/Roads

Grand
Rapids

MI

Grand
Rapids

MI

Grand
Rapids

Funding
Required

Jobs














100,000


2














100,000


2














165,000


3














140,000


3














325,000


5

Wealthy
Street
Bridge
over
the
Grand
River


(Already
under
contract
to
MDOT)












1,285,000


15

Streets/Roads

Riverside
West
Trail
‐
Ann
Street
to
North
Park
Street













1,500,000


20

Streets/Roads

Sidewalk
and
ADA
Ramp
Installa3on
along
Plainfield
Avenue
from
Fuller
Avenue
to
4
Mile
Road












1,000,000


20

MI

Streets/Roads

Sidewalk
Ramps
at
Intersec3ons
&
Alleys












1,000,000


20

Grand
Rapids

MI

Streets/Roads

Concrete
street
repair
at
various
loca3ons
in
the
City












1,000,000


25

Grand
Rapids

MI

Streets/Roads

Reconstruc3on
of
alleys
in
Haqe
Beverly
Project
Area












1,050,000


25

Grand
Rapids

MI

Streets/Roads

Reconstruc3on
of
Ionia
Avenue
from
Fulton
Street
to
Fountain
Street












2,200,000


25

Grand
Rapids

MI

Streets/Roads

Reconstruc3on
of
Sheldon
Avenue
from
Highland
Street
to
Delaware
Street














850,000


25

Grand
Rapids

MI

Streets/Roads

Parking
lot
construc3on
for
economic
development

and
infrastructure
development:

801
Ionia
parking
lot
 (land
plus
construc3on) 










2,800,000


28

Grand
Rapids

MI

Streets/Roads

Plaster
Creek
Trail
Phase
III
‐
Division
Avenue
to
Oxford
Street












2,500,000


30

Grand
Rapids

MI

Streets/Roads

Reconstruc3on
of
Leonard
Street
from
Remembrance
Road
to
Collindale
Avenue












2,500,000


30

Grand
Rapids

MI

Streets/Roads

Repairs
and
Sixth
Street
Bridge
over
the
Grand
River:
west
approach
replacement,
replace
exis3ng
bituminous
 &
3mber
deck
with
a
glulam
deck
and
new
bit
surface,
electrical
work,
epairs
around
bearing
areas
 










1,250,000


30

Grand
Rapids

MI

Streets/Roads

Streetscape
Improvements
to
Madison
Avenue
and
Hall
Street












2,390,573


30

Grand
Rapids

MI

Streets/Roads

Riveredges
Trail
‐
Canal
Street
Park
to
Ann
Street
 










4,100,000


40

Grand
Rapids

MI

Streets/Roads

Seward
Avenue
extension
–
Buferworth
Avenue
to
Fulton
Avenue













3,500,000


45

Grand
Rapids

MI

Streets/Roads

Sidewalk
and
ADA
Ramp
Installa3on
along
M‐11
(28th
Street
from
Division
Avenue
to
East
Paris
Avenue)












3,000,000


60

Grand
Rapids

MI

Streets/Roads

Bridges
‐
Maintainance
&
Repairs












5,000,000


100

Grand
Rapids

MI

Streets/Roads

Parking
lot
construc3on
for
economic
development,
infrastructure
development,
and
housing
‐
structure
LEED
 cer3fied:

Gallery
at
Fulton
(construc3on) 








12,000,000


120

Grand
Rapids

MI

Streets/Roads

Reconstruc3on
of
Miscellaneous
BRT
Route
Streets Ransom
Avenue
(Fulton
to
Lyon) Lafayefe
Avenue
(Fountain
to
Michigan) Jefferson
Avenue
(Cherry
to
Fulton) Division
Avenue
(Franklin
to
Wealthy) 








11,890,669


130

Grand
Rapids

MI

Streets/Roads

Millennium
Park
‐
Wealthy
Street
Extension
Es3mate










15,000,000


170

Grand
Rapids

MI

Streets/Roads

Rotomill/resurface
Streets
–
Various
Loca3ons










22,500,000


225

Grand
Rapids

MI

Water

Line
(CIPP)
2000'
of
WWTP
Scrubber
pipeline














180,000


5

Grand
Rapids

MI

Water

Replacement
of
Emergency
Generators
at
Various
Loca3ons














200,000


5

Grand
Rapids

MI

Water

Contract
No.
10












2,000,000


10

Grand
Rapids

MI

Water

Conversion
of
the
PERB
to
FEB
at
the
WWTP














800,000


10

Grand
Rapids

MI

Water

Odor
Control
at
the
WWTP












2,000,000


10

Grand
Rapids

MI

Water

Replacement
of
Process
Gate
Actuators
at
the
WWTP












1,200,000


15

Grand
Rapids

MI

Water

Construc3on
of
Aggregate
Storage
Bins
at
Sewer
Maint
Building














260,000


20

Grand
Rapids

MI

Water

East
Side
CSO
Cn#19












2,750,000


20

Grand
Rapids

MI

Water

Improvements
to
the
Final
Effluent
Screw
Pumps
at
WWTP














800,000


20

Grand
Rapids

MI

Water

Miscellaneous
Structural
Repairs
at
MARB












1,135,000


20

Grand
Rapids

MI

Water

Replacement
of
Low
Lib
Valves
at
Lake
Michigan
Filtra3on
Plant
















75,000


20

Grand
Rapids

MI

Water

Replacement
of
the
Kingsbury
Lib
Sta3on
and
Forcemain












2,100,000


20

Grand
Rapids

MI

Water

Structural
Strength
Improvements
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
2














290,000


20

City

State

Program

Grand
Rapids

MI

Water

Alger
Reservoir
Improvements

Project
Descrip3on

Funding
Required 










1,400,000


Jobs 25

Grand
Rapids

MI

Water

Grand
Rapids

MI

Water

Concrete
Restora3on
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
3














670,000


25

Concrete
Restora3on,
Phase
2,
at
the
LMFP














380,000


Grand
Rapids

MI

25

Water

Livingston
Power
Subyard
upgrades














250,000


Grand
Rapids

25

MI

Water

Replacement
of
Pump
Motor
Starters
for
Franklin
pumps
1
and
3














300,000


25

Grand
Rapids

MI

Water

Replacement
of
the
Bird
Avenue
Lib
Sta3on












1,050,000


25

Grand
Rapids

MI

Water

Replacement
of
Valves
at
Monroe
tank














100,000


25

Grand
Rapids

MI

Water












1,250,000


25

Grand
Rapids

MI

Water

Sanitary
Sewer
and
Watermain
Replacement
in
Chatham
Street,
Jackson
Street,
Straight
Avenue
and
Na3onal
 Avenue Watermain
replacement
in
Hovey
from
lane
to
Fulton
















80,000


25

Grand
Rapids

MI

Water

Watermain
replacement
in
Lockridge
from
Diamond
to
east
end














175,000


25

Grand
Rapids

MI

Water

Concrete
Restora3on
at
Lake
Michigan
Filtra3on
Plant
‐
Phase
4












1,390,000


30

Grand
Rapids

MI

Water

East
Side
Combined
Sewer
Overflow
(CSO)
Cn#12A












2,850,000


30

Grand
Rapids

MI

Water

East
Side
CSO
CN#12B












3,500,000


30

Grand
Rapids

MI

Water

East
Side
CSO
Cn#20












3,200,000


30

Grand
Rapids

MI

Water

Renova3ons
of
Filters
3,
5,
7
and
9
at
Lake
Michigan
Filtra3on
Plant












2,200,000


30

Grand
Rapids

MI

Water

Replacement
of
High
Lib
#2
Discharge
Valves
at
Lake
Michigan
Filtra3on
Plant














500,000


30

Grand
Rapids

MI

Water

Replacement
of
the
Bona
Vista
Lib
Sta3on












2,200,000


30

Grand
Rapids

MI

Water

Saddleback
Trunk
Sewer
Cn
#4












3,900,000


30

Grand
Rapids

MI

Water

Saddleback
Trunk
Sewer
Cn
#3












2,800,000


35

Grand
Rapids

MI

Water

Saddleback
Trunk
Sewer
Cn
#1












6,200,000


45

Grand
Rapids

MI

Water

East
Side
Combined
Sewer
Overflow












4,375,000


50

Grand
Rapids

MI

Water

Knapp
Street/East
Beltline
Transmission
Watermain












6,243,000


50

Grand
Rapids

MI

Water

Miscellaneous
Watermain
Valve
Repalcement












1,000,000


50

Grand
Rapids

MI

Water

Replacement
of
watermain
in
Clearbrook,
Eastbrook
and
Chamberlain












1,080,000


50

Grand
Rapids

MI

Water

Turner
Avenue/Bridge
Street
Sanitary
Sewer
Reloca3on












3,900,000


50

Grand
Rapids

MI

Water

Watermain
replacement
in
Ann
from
Plainfield
to
Oakwood
and
Oakwood
from
Ann
to
Knapp














260,000


50

Grand
Rapids

MI

Water

Watermain
replacement
in
Breton
north
of
Burton














250,000


50

Grand
Rapids

MI

Water

Watermain
replacement
in
Grove
from
Plainfield
to
Taylor
and
in
Taylor
from
Grove
to
Plainfield














540,000


50

Grand
Rapids

MI

Water

Watermain
replacement
in
Van
Auken
‐
Fuller
to
Kalamazoo














520,000


50

Grand
Rapids

MI

Water

Watermain
replacement
in
Washtenaw
‐
Westlane
to
east
end














410,000


50

Grand
Rapids

MI

Water

East
Side
CSO
Cn#14










10,700,000


55

Grand
Rapids

MI

Water

4
Mile
Road
Elevated
Storage
tank












2,000,000


100

Grosse
Pointe

MI

CDBG

400
Car
Municipal
Parking
Structure
‐
South
of
Kercheval
between
Notre
Dame
and
St.
Clair












7,500,000


208.3

Grosse
Pointe

MI

Streets/Roads

Cadieux
Avenue
Resurfacing
‐
Kercheval
to
Jefferson














450,000


12.5

Grosse
Pointe

MI

Streets/Roads

Waterloo
Avenue
Resurfacing
‐
St.
Clair
to
Fisher














490,000


13.6

Grosse
Pointe

MI

Water

Water
Meter
Replacement
and
Installa3on
of
Automa3c
Reading
System














450,000


12.5

Grosse
Pointe

MI

Water

Neff
Road
Pumping
Sta3on
Upgrades














600,000


16.7

Grosse
Pointe

MI

Water

Line
or
Replace
Deteriorated
Sanitary
Sewers












5,250,000


145.8

Grosse
Pointe
Farms

MI

CDBG












2,030,000


56

Grosse
Pointe
Farms

MI

Energy

"Green"
deck
parking
structure. Downtown
business
district
with
inadequate
parking
requires
parking
improvement
and
traffic
flow
 improvement.

Proposed
58
space
single
story
parking
deck
with
"green"
technology
design
 Addi3on
of
a
single
level
parking
deck
with
"Green
roof"
design
criteria.
















2,030,000


56

Grosse
Pointe
Farms

MI

Public
Safety

Purchase
of
new
department
issue
service
weapons
with
holsters,
ammuni3on,
accesories
and
training
















36,000


1

Grosse
Pointe
Farms

MI

Streets/Roads














475,000


13

Grosse
Pointe
Farms

MI

Streets/Roads












1,750,000


48

Grosse
Pointe
Farms

MI

Water












2,750,000


76

Grosse
Pointe
Farms

MI

Water










17,000,000


470

Grosse
Pointe
Woods

MI

Streets/Roads

Mack
Avenue
boulevard
turnaround
reconfigura3on.

Re‐configura3on
will
improve
traffic
flow
and
reduce
 vehicular
and
pedestrian
incident Kercheval
Ave.
streetscape
improvements.
 Streetscape
improvements
include
improved
parking
incorpora3ng
"green"
technologies
in
design
to
improve
 the
quality
of
stormwater
runoff,
energy
efficient
ligh3ng,
increased
green
space
and
landscape Sanitary
Sewer
rehabilita3on. City
has
over
5
miles
of
aging
sanitary
sewer
located
within
residen3al
rear
yards,
making
access
and
repair
 difficult
and
cost
prohibi3ve.

 Sea‐wall
and
Ouzall
rehabilita3on. City
is
bordered
by
2.7
miles
of
Lake
St.
Clair
and
has
an
aging
concrete
sea‐wall
with
32
stormwater
ouzalls. Morningside
Road
Resurfacing‐
Renaud
to
Lochmoor














250,000


7

Grosse
Pointe
Woods

MI

Streets/Roads

Crescent
Lane
Reconstruc3on

Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods

MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water

Hun3ngton
Reconstruc3on‐
Mack
to
Holiday Wedgewood/
Maple
Lane
Reconstruc3on Severn
Reconstruc3on‐
Mack
to
Bramcaster Broadstone
Reconstruc3on‐
Mack
to
West
City
Limit Country
Club
Reconstruc3on‐
Mack
to
West
City
Limit Lancaster
Reconstruc3on‐
Mack
to
West
City
Limit Oxford
Reconstruc3on‐
Mack
to
Holiday Oxford
Reconstruc3on‐
Mack
to
West
City
Limit Anita
Reconstruc3on‐
Mack
to
Charlevoix North
Oxford
Reconstruc3on‐
Fairway
to
Morningside Sunningdale
Reconstruc3on‐
Fairway
to
East
City
Limit Marter
Road
Resurfacing‐Vernier
Road
to
Parkway Vernier
Road
Resurfacing‐
Charlevoix
to
Fairway Allard
Reconstruc3on‐
Mack
to
West
City
Limit South
Renaud
Reconstruc3on‐
Mack
to
North
Renaud Stanhope
Reconstruc3on‐
Mack
to
West
City
Limit Bournemouth
Water
Main
Replacement‐
Mack
to
Leslie Hampton
Water
Main
Replacement‐
Wedgewood
to
East
City
Limit














300,000
 












310,000
 












310,000
 












350,000
 












450,000
 












450,000
 












450,000
 












450,000
 












500,000
 












550,000
 












600,000
 












700,000
 












750,000
 












850,000
 










1,100,000
 










1,150,000
 










1,300,000
 












360,000
 












350,000


9 9 9 10 13 13 13 13 14 16 17 20 21 24 31 32 37 10 10

City

State

Program

Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Grosse
Pointe
Woods Jackson Jackson Jackson

MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI

Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG CDBG CDBG

Lancaster
Water
Main
Replacement‐
Mack
to
West
City
Limit Newcastle
Water
Main
Replacement‐
Mack
to
West
City
Limit Ridgemont
Water
Main
Replacement‐
Mack
to
West
City
Limit Hollywood
Water
Main
Replacement‐
Goethe
to
Marter Lochmoor
Water
Main
Replacement‐
Wedgewood
to
East
City
Limit Severn
Water
Main
Replacement‐
Mack
to
West
City
Limit Water
Main
Loops‐
Various
Loca3ons Sunningdale
Water
Main
Replacement‐
Fairway
to
East
City
Limit Anita
Water
Main
Replacement‐
Mack
to
Marter Allard
Water
Main
Replacement‐
Mack
to
West
City
Limit Brys
Drive
Water
Main
Replacement‐
Mack
to
Marter Fairholme
Water
Main
Replacement‐
Mack
to
Fairford South
Renaud
Water
Main
Replacement‐
Mack
to
North
Renaud Water
System
Reservoir Line
or
Replace
Structurally
Deficient
Sanitary/Combined
Sewers Rent
to
own
home
construc3on
20
homes Dangerous
Building
Demoli3on Water
Main
Replacement

Project
Descrip3on

Jackson

MI

CDBG

Jackson

MI

Jackson

MI

Jackson

Funding
Required 












350,000
 












335,000
 












350,000
 












365,000
 












500,000
 












500,000
 












500,000
 












520,000
 












560,000
 












620,000
 












640,000
 












820,000
 












900,000
 










2,000,000
 










8,000,000
 










2,400,000
 










1,000,000


Jobs 10 10 10 11 14 14 14 15 16 18 18 23 25 56 223 50














500,000


50

Local
Street
Reconstruc3on












1,000,000


100

Public
Safety

Replacement
of
40‐year
old
Police
Department
radio
system












1,000,000


Streets/Roads

Neighborhood
Street
Resurfacing












1,000,000


20

MI

Streets/Roads

Ganson
Street
Reconstruc3on














373,000


30

Jackson

MI

Streets/Roads

Mechanic
Street
Bridge
Replacement












1,226,830


40

Jackson

MI

Streets/Roads

Arts
Walk‐Riverwalk
Trail












1,723,997


50

Jackson

MI

Streets/Roads

Local
Street
Reconstruc3on
NonCDBG












1,000,000


100

Jackson

MI

Transit

Intermodal
Transporta3on
Facility
Preserva3on












1,500,000


75

Jackson

MI

Water

Water
Main
Replacement
Brown
Street














410,000


30

Jackson

MI

Water

Water
Main
Replacement
Dwight
Street














373,000


30

Jackson

MI

Water

Water
Main
replacement‐Lewis
Glick
Highway














523,000


30

Kalamazoo

MI

CDBG
















77,000


10

Kalamazoo

MI

CDBG

Remarcite
Kik
Pool:

New
plaster
in
en3re
pool,
repair
and
replace
3les
in
lane
line,
feather
new
plaster
into
 gufer. Renova3on
of
por3ons
of
cemetery
walls
which
have
deteriorated
due
to
age
and
storms.














100,000


15

Kalamazoo

MI

CDBG

Ianelli
Historical
Fountain
Repairs
and
Restora3on.














250,000


30

Kalamazoo

MI

CDBG

Sidewalk
Replacement
‐
N.
Park
&
N.
Westnedge
(4
miles
of
sidewalk).














562,000


30

Kalamazoo

MI

CDBG

Burr
Oak
Court
Street
&
Streetscape
Improvements.
















96,000


35

Kalamazoo

MI

CDBG

Improvements
to
Soisson/Rapzez/Clason
Field
‐
New
scoreboard,
PA
System,
and
Restroom
Improvements.














128,100


35

Kalamazoo

MI

CDBG

Business
Loop
I‐94
‐
Business
Loop
Gateway
Inprovements,
Phase
I.














610,000


40

Kalamazoo

MI

CDBG

N.
Park
and
N.
Westnedge
Streetscape
Improvements














502,000


40

Kalamazoo

MI

CDBG

Stuart/Fairmount
Community
Center














500,000


40

Kalamazoo

MI

CDBG














700,000


50

Kalamazoo

MI

CDBG














500,000


50

Kalamazoo

MI

CDBG














500,000


50

Kalamazoo

MI

CDBG














900,000


50

Kalamazoo

MI

CDBG

Crane
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
parking
improvements
&
 landscaping. Farrell
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
playground
equipment,
 restroom/shelter,
landscaping
&
park
furnishings. Kalamazoo
Farmers
Market
‐
New
roof
structure,
ADA
accessibility
improvements,
parking
lot
improvements,
&
 streetscape. La
Crone
Park
‐
Redevelopment
of
park,
demoli3on,
ADA
accessibility
improvements,
playground
equipment,
 restroom/shelter,
landscaping
&
park
furnishings. Parkview
Ave.
‐
Non‐motorized
pathway
and
bridge
at
Cherry
Creek.














400,000


50

Kalamazoo

MI

CDBG

Kalamazoo

MI

CDBG

Kalamazoo

MI

CDBG

Kalamazoo

MI

Kalamazoo

Woods
Lake
‐
Redevelopment
of
park,
demoli3on,
walkways,
ADA
accessibility,
restroom/shelter,
playland,
 landscaping
&
park
furnishings. Citywide
ADA
Sidewalk
Ramp
Improvements.














800,000


50












3,000,000


75














570,000


90

Energy

City
Hall
Improvements
‐
Roof
replacement,
security
system
installa3on
‐
Upgrade
deteriorated
Budget
&
Acct.
 facili3es
and
Treasury
Dept.

ADA
Upgrade.

Upgrade
City
Centrex
Phone
System. Bronson
Park
Improvements
‐
Install
17
above
ground
pedestals
with
electric
receptacles
and
3mers.
















35,000


5

MI

Energy

Replace
one
100
ton
chiller
at
Public
Safety
Headquarters
that
is
well
past
its
life
cycle.














130,000


10

Kalamazoo

MI

Energy

City
Hall
‐
Replace
storm
windows
with
energy
efficient
units.














300,000


25

Kalamazoo

MI

Energy

Energy
efficient
ligh3ng
renova3ons
for
City
Hall
and
other
City
Buildings.














200,000


25

Kalamazoo

MI

Energy












2,000,000


40

Kalamazoo

MI

Energy

Kalamazoo

MI

Energy

Traffic
Signal
Upgrades
‐
Upgrade
10
traffic
signalized
intersec3ons.

Energy
efficiency
project
to
save
80%
in
 signal
energy
consump3on/costs
and
reduce
air
pollutant
emissions. Secondary
Process
Improvements
‐
Enhanced
Biological
Phosphorus
Removal
System
and
fine
bubble
aera3on
 system.

Significant
energy
savings
of
$500,000/yr. 100
Hybrid
vehicles
for
City
Fleet.

Kalamazoo

MI

Public
Safety

Public
Safety
School
Resource
officers.














500,000


5

Kalamazoo

MI

Public
Safety

Replace
Emergency
Warning
System
throughout
the
City.














150,000


15

Kalamazoo

MI

Public
Safety

Upgrade
in‐car
video
recording
system
to
digital
system.














500,000


25

Kalamazoo

MI

Public
Safety

Demoli3on
of
Public
Sta3on
#4
on
Rose
Street
to
green
space
and
demoli3on
of
Cedar
Street
Training
Center.














550,000


40

Kalamazoo

MI

Public
Safety

Firearms
Range
at
Public
Safety
Training
Complex.












5,000,000


100

Kalamazoo

MI

Streets/Roads

Paving
of
cemetery
roads.














100,000


20

Kalamazoo

MI

Streets/Roads

Water
Street
(Pitcher
to
Kalamazoo)
‐
Mill
and
resurface
















51,000


20

Kalamazoo

MI

Streets/Roads

Cork
Street
(Burdick
to
W
of
Lovers
Lane)
‐
Mill
and
resurface














315,000


35

Kalamazoo

MI

Streets/Roads

Cork
Street
(Westnedge
to
Burdick
)
‐
Mill
and
resurface.














300,000


35

Kalamazoo

MI

Streets/Roads

Davis
Street
(Wheaton
to
Lovell
Street)
‐
Mill
and
resurface.














252,000


35

Kalamazoo

MI

Streets/Roads

Edwards
Street
conversion
to
two‐way.














218,000


35

Kalamazoo

MI

Streets/Roads

Lovers
Lane
(Cork
to
Royce)
‐
Mill
and
resurface.














260,000


35












8,000,000


300












3,000,000


1000

City

State

Program

Kalamazoo

MI

Streets/Roads

March
Street
(Miller
to
Stockbridge)
‐
Mill
and
resurface.

Project
Descrip3on

Funding
Required 












315,000


Jobs 35

Kalamazoo

MI

Streets/Roads

Kalamazoo

MI

Streets/Roads

Reed
Street
(Burdick
to
Portage
Street)
‐
Mill
and
resurface.














265,000


35

S.
Burdick
(Cork
to
Crescent
Drive)
‐
Mill
and
resurface.














278,000


Kalamazoo

MI

35

Streets/Roads

Scafered
Site
Paving:

Milling
and
reconstruc3on
of
intersec3ons
and
small
sec3ons
of
streets.














300,000


Kalamazoo

35

MI

Streets/Roads

Placement
of
sidewalk
in
areas
where
sidewalk
is
deficient














240,000


40

Kalamazoo

MI

Streets/Roads

Arboretum
Parkway/Solon/Howard

Intersec3on
Improvements
(2
roundabouts).












1,400,000


50

Kalamazoo

MI

Streets/Roads

Parking
system
infrastructure
improvements.














580,000


50

Kalamazoo

MI

Streets/Roads

Intersec3on
Improvements
at
Parkview
Avenue
and
Oakland
Drive
‐
Widen
to
improve
capacity
and
safety.












1,300,000


60

Kalamazoo

MI

Streets/Roads

Milling
and
reconstruc3on
of
local
streets
(Phase
I).












2,000,000


100

Kalamazoo

MI

Streets/Roads

Milling
and
reconstruc3on
of
local
streets
(Phase
II).












2,000,000


100

Kalamazoo

MI

Streets/Roads

Portage
Street
Streetscape,
Phase
1.












3,340,000


100

Kalamazoo

MI

Transit












2,700,000


20

Kalamazoo

MI

Transit












4,000,000


50

Kalamazoo

MI

Transit












2,200,000


50

Kalamazoo

MI

Water

Acquire
and
install
an
integrated,
comprehensive
management/customer
service
automa3c
vehicle
locator
 (AVL)
system. Construct
60'
x
300'
concrete
and
steel
passenger
canopy
over
the
AMTRAK
rail
plazorm
at
the
Kalamazoo
 Transporta3on
Center. Facility
expansion
of
administra3ve
office
area
as
part
of
transi3on
of
Kalamazoo
Metro
Transit
from
a
city
 department
to
the
governance
of
a
county‐wide
transit
authority. New
Process
Analyzers
for
Phosphorus
levels.
















50,000


10

Kalamazoo

MI

Water

Replacement
of
old
and
worn
pump
and
motors
that
can
not
be
repaired.
















70,000


10

Kalamazoo

MI

Water

Computer
hardware
and
sobware
for
water
and
wastewater
support
staff.














130,000


15

Kalamazoo

MI

Water

Design
and
construct
a
sewer
from
the
Ter3ary
Mudwell
into
the
Recycle
Pump
Sta3on.
















75,000


15

Kalamazoo

MI

Water














150,000


20

Kalamazoo

MI

Water

Replace
the
remaining
Distributed
Control
Units
(DCU
2000s)
with
the
updated
DCU
3200s
and
upgrade
 conductor
sobware
to
most
recent
revision. Perform
well
drilling/installa3ons,
development,
tes3ng,
well
pump
and
motor
installa3ons.














300,000


25

Kalamazoo

MI

Water

Public
Safety
Sewer
Extension
‐
Nazareth
Road
Sewer.














150,000


25

Kalamazoo

MI

Water














320,000


25

Kalamazoo

MI

Water

Update
deteriorated
instrumenta3on,
variable
frequency
drives,
actuators,
controls
and
electrical
equipment
 at
the
Water
Reclama3on
Plant,
as
well
as
upgrade
to
telemetry
to
Lib
Sta3ons. Install
new
ter3ary
screw
pump
with
the
open
design
in
place
of
exis3ng.














500,000


30

Kalamazoo

MI

Water

Valve
Improvement
‐
Annual
water
valve
exercise
and
replacement
program.














210,000


30

Kalamazoo

MI

Water

Water
Meter
Improvement
‐
Annual
meter
capital
replacement
program.














249,000


30

Kalamazoo

MI

Water

Water
Resource
New
and
Replacement
Wells:

Replace
low
producing
wells.














445,000


30

Kalamazoo

MI

Water

Pain3ng
of
exterior
of
Mt.
Olivet,
Dartmouth,
and
Edgemoor
water
storage
tanks.














920,000


40

Kalamazoo

MI

Water

New
and
replacement
hydrants.














260,000


45

Kalamazoo

MI

Water

Replace
lead
water
services.














223,000


45

Kalamazoo

MI

Water

Replace
the
three
exis3ng
bar
screens
in
the
Raw
Pump
Building.














773,000


50

Kalamazoo

MI

Water












1,000,000


50

Kalamazoo

MI

Water














515,000


50

Kalamazoo

MI

Water

Replacement
of
deteriorated
equipment
and
facili3es
at
Water
Reclama3on
Plant,
including
Raw
Sewage
 Pumps,
Site
Heat
loop
system
and
other
major
equipment. Upgrade
exis3ng
lib
sta3ons
including
pump
replacement
and
repairs,
standby
generators,
maintaining
 approaches,
and
building
repairs.

Also,
upgrading
Virginia
Avenue
and
Burke
Court
ejector
sta3on. Arcadia
Trunk
Sanitary
Relief
Sewer
‐
Ransom
Street.

Kalamazoo

MI

Water

New
and
replacement
sewers
as
well
as
the
lining
of
sewers
prone
to
I
&
I.

Kalamazoo

MI

Water

Kalamazoo

MI

Water

Kalamazoo

MI

Keego
Harbor












2,400,000


75












1,425,000


100

Water
Pumping
Sta3on
Improvements
and
replacement
of
building
sta3on
structures
and
equipment.














900,000


100












2,000,000


150

Water

New
&
replacement
Water
Main
as
a
result
of
Public
Works
projects
or
substandard
main
due
to
size,
 condi3on. Replacement
of
Water
Pumping
Sta3on
#8.












3,500,000


300

MI

Streets/Roads


Andre
Road
Reconstruc3on
‐
Kendrick
Street
to
End

















28,000


1

Keego
Harbor

MI

Streets/Roads


Atlas
Road
Reconstruc3on
‐
Kendrick
Street
to
Brock
Street


Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor

MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads


Bulwer
St
Reconstruc3on
‐
Willow
Beach
Ave
to
End
 
Elam
Ct
Reconstruc3on
‐
Cass
Lake
Road
to
Pine
Lake
Avenue
 
Ofer
Ave
Reconstruc3on
‐
Cass
Lake
Road
to
City
Limits
 
Virginia
Ct
Reconstruc3on
‐
Kendall
Road
to
Hester
Court
 
Beachland
Blvd
Reconstruc3on
‐
Cass
Lake
Road
to
end
 
Brock
St
Reconstruc3on
‐
Kendrick
to
Atlas
 
Cass
Lake
Ave
Reconstruc3on
‐
Willow
Beach
Ave
to
Cass
Lake
Road
 
Cordell
St
Reconstruc3on
‐
Beechmont
to
Beechcrob
 
Nagle
Ct
Reconstruc3on
‐
Pine
Lake
Avenue
to
Hessler
Court
 
Norcof
St
Reconstruc3on
‐
Cass
Lake
Road
to
Cass
Lake
Front
 
Stout
St
Reconstruc3on
‐
Beland
to
Orchard
Lake
Road
 
Kessler
Dr
Reconstruc3on
‐
Cass
Lake
Road
to
City
Limits
 
Knowlson
St
Reconstruc3on
‐Beechmont
Street
to
City
Limits
 
Millwall
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Rycrob
 
Moss
Ave
Reconstruc3on
‐
Cass
Lake
Front
to
Sylvan
Glenn
 
Park
Circle
Reconstruc3on
‐
Willow
Beach
Ave
S
to
Willow
Beach
Ave
N
 
Stennef
St
Reconstruc3on
‐
Beechmont
to
End
 
Varjo
Ct
Reconstruc3on
‐
Orchard
Lake
Road
to
End
 
Wall
St
Reconstruc3on
‐
Beechmont
Street
to
Maddy
Lane
 
Beland
St
Reconstruc3on
‐
Cass
Lake
Road
to
Maddy
Lane
 
Glenbroke
Ave
Reconstruc3on
‐
Cass
Lake
Front
to
Sylvan
Glenn
 
Hensman
Ave
Reconstruc3on
‐
Cass
Lake
Road
to
Rus3c
Lane
 
Portman
St
Reconstruc3on
‐
Cass
Lake
Road
to
Willow
Beach
Ave
 
Prynne
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Cass
Lake
Road
 
Rycrob
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Millwall
Street
 
Stapelton
Ct
Reconstruc3on
‐
Cass
Lake
Road
to
End

















13,000
 














24,000
 














34,000
 














11,000
 














18,000
 














68,000
 














63,000
 














73,000
 














61,000
 














51,000
 














72,000
 














54,000
 














88,000
 












108,000
 












107,000
 












102,000
 














92,000
 














98,000
 














98,000
 














86,000
 












131,000
 












118,000
 












142,000
 












127,000
 












126,000
 












129,000
 












122,000


1 1 1 1 1 2 2 2 2 2 2 2 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4

City

State

Program

Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Keego
Harbor Lansing Lansing Lansing Lansing

MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI MI

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Airport Airport Airport Airport


Beechcrob
St
Reconstruc3on
‐
Sylvan
Glenn
St
to
End
 
Kliest
Ct
Reconstruc3on
‐
Pine
Lake
Ave
S
to
Pine
Lake
Ave
N
 
Maddy
Ln
Reconstruc3on
‐
Orchard
Lake
Road
to
south
End
 
Pine
Lake
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Elam
Court
 
Willow
Beach
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Canal
 
Willow
Beach
Ave
Reconstruc3on
‐
Canal
to
Grove
Court
 
Willow
Beach
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Summers
Road
 
Cass
Lake
Front
Road
Reconstruc3on
‐
Grove
Ct
to
Cass
Lake
Road
 
Fordham
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Summers
 
Hester
Ct
Reconstruc3on
‐
Orchard
Lake
Road
to
end
 
Schroder
Blvd.
Reconstruc3on
‐
Cass
Lake
Road
to
Maddy
Lane
 
Summers
Ave
Reconstruc3on
‐
Orchard
Lake
Road
to
Cass
Lake
Road
 
Sylvan
Glen
St
Reconstruc3on
‐
Hensman
to
End
 
Kendrick
St
Reconstruc3on
‐
Cass
Lake
Road
to
Brock
Street
 
Maddy
Ln
Reconstruc3on
‐
Orchard
Lake
Road
to
north
End
 
Pridham
St
Reconstruc3on
‐
Orchard
Lake
Road
to
Hessler
Court
 
Cass
Lake
Rd
Reconstruc3on
‐
Summers
to
Orchard
Lake
Road
 Capital
Region
Interna3onal
Airport
Easement
Acquisi3on
(East
Approach
Runway
28L) Capital
Region
Interna3onal
Airport
Land
Acquisi3on
(Runway
28L) Capital
Region
Interna3onal
Airport
(Construct
Taxiway
to
East
Ramp
‐
Interna3onal
Gate) Capital
Region
Interna3onal
Airport
Federal
Inspec3on
Sta3on
(Construc3on)

Project
Descrip3on

Funding
Required 












180,000
 












159,000
 












170,000
 












173,000
 












171,000
 












196,000
 












216,000
 












246,000
 












255,000
 












239,000
 












251,000
 












229,000
 












256,000
 












273,000
 












360,000
 












429,000
 












460,000
 












527,000
 












105,000
 












525,000


Jobs












1,052,000


20

Lansing

MI

CDBG

Downtown
Karp
Project
‐
Redevelopment
Project
‐
Mixed
Use












1,000,000


30

Lansing

MI

CDBG

Safe
Routes
to
School
Sidewalk
Gap
Closure
(12
miles
new
sidewalk)












3,000,000


40

Lansing

MI

CDBG

Construc3on
of
Lansing
SmartZone
BioBusiness
Incubator












2,000,000


50

Lansing

MI

CDBG

Redevelopment
of
the
Deluxe
Inn
Site
into
a
Mixed
Used
Development












1,000,000


50

Lansing

MI

CDBG

Renova3on
of
Empty
School
Building
into
the
Informa3on
Technology
Empowerment
Community
Center












3,000,000


50

Lansing

MI

CDBG

Redevelopment
of
Office
Building
into
Downtown
SmartZone
Business
Incubator












2,000,000


75

Lansing

MI

CDBG

Local
Street
Rehabilita3on
(Mill
and
Resurface
12
Miles)












6,000,000


90

Lansing

MI

CDBG

Capital
Club
Towers












2,000,000


100

Lansing

MI

CDBG

Lansing
Center
Expansion










30,000,000


100

Lansing

MI

CDBG

Mixed
Use
Museum
Drive
Redevelopment
Project










20,000,000


150

Lansing

MI

CDBG

Construc3on
of
a
new
City
Market
and
Mixed
Use
Development












3,000,000


200

Lansing

MI

CDBG

Green
Zone
Riverfront
Development










25,000,000


500

Lansing

MI

CDBG

Redevelopment
of
Ofawa
Power
Plant
into
new
Headquarters
for
Accident
Fund
of
America.










25,000,000


500

Lansing

MI

CDBG

Expansion
of
Jackson
Na3onal
Life
Insurance
Headquarters












2,000,000


800

Lansing

MI

Public
Safety

Community
Policing
Ini3a3ve
(Neighborhoods
and
Schools)














800,000


8

Lansing

MI

Streets/Roads

Major
Street
Rehabilita3on
(Mill
and
resurface
6.5
miles)












4,000,000


60

Livonia

MI

Energy

Renovate
HVAC
system
at
Livonia
City
Hall,
to
improve
energy
efficiency,
climate.












4,500,000


Livonia

MI

Transit

Improve
traffic
signals
opera3ons
along
Merriman
in
the
City.

Livonia

MI

Transit

Purchase
23
buses
to
improve
reliability
of
Community
Transit
system.












1,357,000


Livonia

MI

Transit

Resurfacing
of
Newburgh
Road,
from
Six
Mile
to
Seven
Mile.












1,000,000


Livonia

MI

Water

Rebuild
aging
water
and
sewer
lines
at
various
loca3ons
throughout
the
city













3,000,000


Marshall

MI

Streets/Roads

Mansion
Street/N.
Alley
Parking
Lor
Reconstruc3on
















95,000


30

Marshall

MI

Streets/Roads

Sidewalk
and
ADA
ramp
installa3on














290,000


30

Marshall

MI

Streets/Roads

Rice
Creek
Culvert














150,000


35

Marshall

MI

Streets/Roads

Monroe
Street
Bridge
over
Rice
Creek














600,000


50

Marshall

MI

Streets/Roads

S.
Marshall
Avenue
over
the
Kalamazoo
River












1,300,000


50

Marshall

MI

Streets/Roads

Street
Improvement
Program














995,000


50

Marshall

MI

Water

Water
Distribu3on
Improvements












1,000,000


50

Marshall

MI

Water

Fairgrounds
Infrastructure
Improvements












3,700,000


75

Marshall

MI

Water

C
Drive
Infrastructure
Extension










23,200,000


100

Oak
Park

MI

Energy

Oak
Park

MI

Energy










17,000,000


Oak
Park

MI

Streets/Roads

Port
Huron

MI

CDBG

This,
priority
3
project,
would
secure
funding
of
$825,000
for
the
L.E.D.
retrofit
of
1,032
detroit
edison
street
 lights;
1,011
high
pressure
sodium
and
21
mercury
vapor.

The
LED
retrofit
would
create
a
substan3al
energy
 savings
‐
the
project
is
ready
t Oak
Park
seeks
the
construc3on
of
new
energy
efficient
government
buildings
to
house
the
majority
of
 municipal
services.

This
would
replace
an
energy
inefficient
building
constructed
more
than
50
years
ago
and
 expanded
several
3mes
to
accomodate
addi3 This
project
would
secure
the
funding
to
complete
reconstruc3on
of
Meyers
Road,
approximately
3,500
feet
at
 an
es3mated
cost
of
$1.9
million.

the
project
would
be
a
joint
effort
between
the
city
of
Oak
Park,

Royal
Oak
 Township
and
Road
Commission
for
 Appamatox
Area
‐
Street
Resurfacing














648,000


21

Port
Huron

MI

Energy

replace
parking
lot
and
parks
ligh3ng
with
efficient
ligh3ng












1,000,000


33

Port
Huron

MI

Streets/Roads

Riverside
Drive
‐
Mansifeld
to
Elmwood
Reconstruct














341,000


11

Port
Huron

MI

Streets/Roads

State
Street
Realignment
reconstruct
roads












1,160,000


38

Port
Huron

MI

Streets/Roads












2,100,000


70

Port
Huron

MI

Streets/Roads

water
street
10th
street
to
arch reconstruct
concrete
road Water
Street
from
Arch
Street
to
City
limits.

Concrete
reconstruc3on
and
water
rmain












2,500,000


83

Port
Huron

MI

Water

Cedar
Street
sewer
repair














116,000


4

Port
Huron

MI

Water

Replace
Makeup
Air
Furnace
at
the
Waste
Water
Treatment
Plant














250,000


8

Port
Huron

MI

Water

Stone
Street
‐
Glenwood
to
Lincoln,
road
reconstruc3on,
watermain,
sanitary
and
sewer
work














680,000


23

Port
Huron

MI

Water

Replace
raw
sewage
pumps
at
Waste
Water
Treatment
Plant














825,000


27

Port
Huron

MI

Water

diffusers
and
blowers
Waste
Water
Treatment
Plant












1,620,000


54

Port
Huron

MI

Water

Erie
Street
north,
reconstruct
roads,
sanitary
and
storm
sewer
separa3on
and
water
main
work












8,910,000


297

5 5 5 5 5 6 6 7 7 7 7 7 7 8 10 12 13 3 3 20














950,000















825,000


100












1,900,000


City

State

Program

Port
Huron

MI

Water

21st
Street
south,
reconstruct
roads,
sanitary
and
storm
sewer
separa3on
and
water
main
work

Project
Descrip3on

Funding
Required Jobs 








17,430,000
 581

Portage

MI

Streets/Roads

Portage
Public
Schools
Coordinated
Transporta3on
/
Infrastructure

Portage

MI

Streets/Roads

Local
Street
Reconstruc3on












1,000,000


85

Portage

MI

Streets/Roads

Kilgore
Road
‐
South
Westnedge
Avenue
to
Lovers
Lane












1,300,000


100

Portage

MI

Streets/Roads

South
Westnedge
Widening
Under
I‐94












1,300,000


100

Portage

MI

Streets/Roads

West
Milham
‐
Angling
Road
to
12th
Street












4,800,000


200

Portage

MI

Streets/Roads

I‐94
Improvements
‐
Oakland
Drive
to
Portage
Road










62,500,000


865

Portage

MI

Water

South
Westnedge
Storm
Sewer
Relief

Portage

MI

Water

Portage

MI

Roseville

MI

Roseville














600,000


50














750,000


60

Angling
Road
Sanitary
Sewer
Project
‐
Squire
Heath
to
Romence
Road












1,200,000


100

Water

Haverhill
Water
Tank
Replacement












3,600,000


300

CDBG

Kathy
Road
Reconstruc3on‐
Frazho
Road
to
11
Mile
(CDBG
Area)














640,000


18

MI

Streets/Roads

Common
Road
Patching‐
U3ca
to
Gra3ot














470,000


14

Roseville

MI

Streets/Roads

Lifle
Mack
Patching‐
12
Mile
to
13
Mile














930,000


26

Roseville

MI

Streets/Roads

Calahan
Road
Reconstruc3on‐
Common
to
13
Mile












1,040,000


29

Roseville

MI

Streets/Roads

Groveland
Road
Reconstruc3on‐
Mar3n
to
12
Mile












1,040,000


29

Roseville

MI

Streets/Roads

Groveland
Road
Reconstruc3on‐
Frazho
to
11
Mile












1,100,000


31

Roseville

MI

Streets/Roads

Calahan
Road
Reconstruc3on‐
12
Mile
to
Common












1,200,000


34

Roseville

MI

Streets/Roads

Common
Road
Reconstruc3on‐Groesbeck
to
U3ca












1,400,000


39

Roseville

MI

Water

Mar3n
Road
Water
Main
Replacement‐
Brinker
to
East
City
Limit














550,000


16

Roseville

MI

Water

U3ca
Water
Main
Replacement‐
Gra3ot
to
Castle












1,500,000


42

Roseville

MI

Water

Water
System
Reservoir












2,500,000


70

Roseville

MI

Water

Line
or
Replace
Structurally
Defiecient
Sanitary/Combined
Sewers










15,000,000


417

Southfield

MI

Airport

Heliport
at
Town
Center
Transit
Center
(11
&
Lasher),
construc3on
and
acquis3on
of
impact
area










10,000,000


40

Southfield

MI

CDBG

Southfield

MI

CDBG

ADA
Pool
‐
Town
Center
with
accessible
locker
rooms












8,200,000


40

Southfield

MI

CDBG

John
Grace
Center
‐
employment
training
center
‐
rec
center










12,000,000


50

Southfield

MI

CDBG

Senior
Center










15,000,000


60

Southfield

MI

CDBG

Local
Street
Pavement
‐
new
watermains,
sewer
reparis











30,000,000


100

Southfield

MI

Energy

energy
efficiences
improvements
for
civic
center
facili3es










10,000,000


40

Southfield

MI

Housing

McDowell
Tower












2,500,000


10

Southfield

MI

Public
Safety

community
policing
programs














900,000


9

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐
Northland
Drive‐
streetscape,
traffic
control
improvements














425,000


2

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐
Providence
Drive
‐
streetscape,
traffic
control
improvements














520,000


3

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐
sidewalk
connec3ons
and
ADA
upgrades















765,000


3

Southfield

MI

Streets/Roads

Beech
Road
Bridge












1,000,000


4

Southfield

MI

Streets/Roads

non‐motorized
paths












1,000,000


4

Southfield

MI

Streets/Roads

11
Mile
Road
over
Pernic
Drain












1,250,000


5

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐
M‐10
‐
streetscape,
traffic
control
improvements












1,470,000


5

Southfield

MI

Streets/Roads

Franklin
Road
from
American
Road
to
11
Mile
Road










16,000,000


8

Southfield

MI

Streets/Roads

street
ligh3ng
change
out
civic
enter












1,800,000


8

Southfield

MI

Streets/Roads

Town
Centre
Corridor
Improvement
Authority‐
streetscape,
traffic
control
improvements












3,250,000


10

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐
Greenfield
streetscape,
traffic
control
improvements












1,620,000


12

Southfield

MI

Streets/Roads

Inkster
Road
from
9
to
11
mile












2,300,000


12

Southfield

MI

Streets/Roads

Telegraph
Technology
Corridor
Improvement
Authority
‐
streetscape,
traffic
control
improvements












3,750,000


12

Southfield

MI

Streets/Roads

Evergreen
Road
from
8
mile
to
9
mile
rd










35,000,000


16

Southfield

MI

Streets/Roads

local
street
repairs
sec3on
13
&
water
main
rehab/replacement












7,000,000


20

Southfield

MI

Streets/Roads

Washington
Heights,
including
drainage
improvements












7,000,000


20

Southfield

MI

Streets/Roads

Cornerstone
District
Authority‐streetscape
improvements













5,308,650


25

Southfield

MI

Streets/Roads

Evergreen
Road
from
10
mile
Road
w.Drainage
improvements
with
street
scape










15,000,000


30

Southfield

MI

Transit

Transit
Center
at
Towne
Center
(11
&
Lasher)












4,500,000


18

Southfield

MI

Transit

Transit
center
at
CDA












4,840,000


20

Southfield

MI

Water

SCADA
System
upgrade














700,000


3

Southfield

MI

Water

sanitary
pumping
sta3on
rehabila3on
and
upgrades












1,000,000


4

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
Beech
Woods
Greening
Project












2,000,000


4

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
deten3on
pond
retrofits
(various
sites
throughout
the
City)












2,000,000


4

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
Holy
Sepulture
storm
reten3on
project












2,000,000


4

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
LTU
Wetlands












2,000,000


4

Southfield

MI

Water

system
wide
leak
detec3on
program
for
water
conserva3on












1,000,000


4

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
Carpernter
Lake
Nature
Center












2,000,000


5

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
Rouge
River
Green
Corridor












3,000,000


6

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
sep3c
program
(loca3ons
throughout
the
west
side
of
the
city)












4,000,000


10

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
MDOT
Tamarack
Basin












4,000,000


16

Southfield

MI

Water

meter
change
out
program












6,500,000


20

Southfield

MI

Water

Sanitary
Sewer
Rehabilia3on,
City
Wide












5,000,000


20

Southfield

MI

Water










11,250,000


25

Southfield

MI

Water

Storm
and
Watershed
management
projects
‐
streabank
and
infrastructure
eroison
projects
(loca3ons
 throughout
the
City) water
system
rehabilita3on












5,000,000


25

Southgate

MI

Energy

Construc3on
of
a
10.8
photovoltaic
system
to
provide
electrical
power
to
the
Veterans
Memorial
Library.

Southgate

MI

Public
Safety

Construc3on
of
a
regional
911
call
center
to
dispatch
police
and
fire
units
for
up
to
7
ci3es.

St.
Clair

MI

CDBG

Barrier
Free
Kayak
Access
and
Dock
at
Marina














140,000


5












2,000,000


18
















75,000


2.1

City

State

Program

St.
Clair

MI

CDBG

Replace
Pavillion
at
Marina

Project
Descrip3on

Funding
Required 














75,000


Jobs 2.1

St.
Clair

MI

CDBG

St.
Clair

MI

CDBG

Floa3ng
Dock
and
Fishing
Pier
at
Rotary
Park














175,000


4.9

Fred
Moore
Highway
Bike
Path
Extension
‐
15th
to
Clinton














250,000


St.
Clair

MI

6.9

Streets/Roads

Clinton
Street
Parking
and
Streetscape
‐
6th
Street
to
M‐29














500,000


13.9

St.
Clair St.
Clair
Shores

MI

Water

Line
or
Replace
Deteriorated
Sanitary
Sewers












2,000,000


55.6

MI

CDBG

Gordon
Paving
‐Harper
to
Florence














324,000


9

St.
Clair
Shores

MI

CDBG

Florence
Paving
‐
11
Mile
to
Mar3n














810,000


23

St.
Clair
Shores

MI

CDBG

Gladstone
Paving
‐
11
Mile
to
Mar3n














810,000


23

St.
Clair
Shores

MI

CDBG

Roy
Paving
‐
11
Mile
to
Mar3n














810,000


23

St.
Clair
Shores

MI

Streets/Roads

Lingemann
Paving
‐
Edgewood
to
Loren














358,000


10

St.
Clair
Shores

MI

Streets/Roads

9
Mile
Road
Reconstruc3on
‐
Greater
Mack
to
Harper












2,050,000


57

St.
Clair
Shores

MI

Streets/Roads

9
Mile
Road
Reconstruc3on
‐
Jefferson
to
Greater
Mack












2,600,000


72

St.
Clair
Shores

MI

Water














360,000


10

St.
Clair
Shores

MI

Water

Bon
Brae
Water
Main
‐
Harper
to
B
Street.

Include
the
replacement
of
aging
water
main
in
know
PCB
 contaminated
area. Euclid
Water
Main
‐
Jefferson
to
Greater
Mack.

Includes
replacement
of
aging
8"
water
main.














455,000


13

St.
Clair
Shores

MI

Water

Parkside
Water
Main
‐
Beaconsfield
to
8
Mile.

Includes
replacement
of
aging
8"
water
main.














485,000


14

St.
Clair
Shores

MI

Water

10
Mile
Road
Water
Main
‐
Harper
to
I‐94.

Includes
the
replacement
of
an
80+
year
old
water
main.












1,150,000


32

St.
Clair
Shores

MI

Water












1,500,000


42

St.
Clair
Shores

MI

Water

Water
Resevoir
Upgrades
‐
Includes
upgrading
former
DWSD
storage
tank
to
sufficient
water
during
peak
 periods. Harper
Water
Main
‐
13
Mile
Road
to
north
City
limits.

Includes
replacment
of
80+
year
old
12"
water
main.












2,540,000


71

St.
Clair
Shores

MI

Water












5,400,000


150

Sterling
Heights

MI

CDBG

Replace
residen3al
water
meters.

Includes
replacing
all
residen3al
meters
that
have
outlived
their
normal
life
 expectancy. City
Facili3es
Roof
Replacement














130,000


20

Sterling
Heights

MI

Public
Safety

45
New
Mobile
Data
Computers














300,000


Sterling
Heights

MI

Public
Safety

Mass
No3fica3on
System














100,000


Sterling
Heights

MI

Public
Safety

Police
911
Replacement
Computer
System














175,000


Sterling
Heights

MI

Public
Safety

Replace
20
year
old
Fire
Truck














500,000


Sterling
Heights

MI

Public
Safety

Upgrade
20
year
old
Emergency
Warning
Sirens

Sterling
Heights

MI

Schools

Boiler
replacement
at
3
buildings












1,500,000


3

Sterling
Heights

MI

Schools

Replacement
of
doors
and
windows
at
22
K‐12
buildings












3,000,000


15

Sterling
Heights

MI

Schools

Restroom
remodeling
with
energy
efficient
fixtures
(water
conserva3on
‐
green)
at
22
schools












5,600,000


30

Sterling
Heights

MI

Schools

Replace
exis3ng
ligh3ng
and
wiring
to
energy
efficient
T‐8's
with
occupancy
sensors
in
22
K‐12
buildings










10,000,000


50

Sterling
Heights

MI

Schools

Roofing
and
insula3on
at
22
K‐12
buildings










10,000,000


50

Sterling
Heights

MI

Streets/Roads

Front
End
Loader














220,000


5

Sterling
Heights

MI

Streets/Roads

Salt
Brine
Spreaders
for
Snow
Plows














720,000


5

Sterling
Heights

MI

Streets/Roads

Street
Sweeper














240,000


5

Sterling
Heights

MI

Streets/Roads

Tandem
Axle
Snow
Plow














150,000


5

Sterling
Heights

MI

Streets/Roads

17
Mile
Road
Bridge
Repair














500,000


10

Sterling
Heights

MI

Streets/Roads

Intersec3on
Improvements
‐
18
Mile
Road
&
U3ca
Road












1,920,000


10

Sterling
Heights

MI

Streets/Roads

Neighborhood
Street
Resurfacing












2,500,000


10

Sterling
Heights

MI

Streets/Roads

15
Mile
Road
Reconstruc3on
(Mound
to
Van
Dyke)












4,300,000


20

Sterling
Heights

MI

Streets/Roads

18
Mile
Road
Widening
‐
Clinton
River
Road
to
Schoenherr
Road












2,250,000


20

Sterling
Heights

MI

Streets/Roads

18
Mile
Road
Widening
‐
Mound
Road
to
Ryan
Road












4,034,400


20

Sterling
Heights

MI

Streets/Roads

18
Mile
Road
Widening
‐
Mound
Road
to
Van
Dyke
(City
share)














800,000


20

Sterling
Heights

MI

Streets/Roads

18
Mile
Road
Widening
‐
Ryan
Road
to
Dequindre
Road












3,192,000


20

Sterling
Heights

MI

Streets/Roads

18
Mile
Road
Widening
‐
Van
Dyke
to
U3ca
Road












3,564,000


20

Sterling
Heights

MI

Streets/Roads

19
Mile
Road
Widening
‐
Dequindre
Road
to
Ryan
Road












3,500,000


20

Sterling
Heights

MI

Streets/Roads

19
Mile
Road
Widening
‐
Mound
Road
to
Van
Dyke












3,720,000


20

Sterling
Heights

MI

Streets/Roads

Dodge
Park
Road
Reconstruc3on
&
Widening
‐
Metroparkway
to
U3ca
Road












2,400,000


20

Sterling
Heights

MI

Streets/Roads

Repairs
to
Concrete
Major
Roads
(Mound,
Metro
Pkwy)












1,000,000


20

Sterling
Heights

MI

Water

Sewer
Jet

Sterling
Heights

MI

Water

Storm
Sewer
Lib
Sta3on
Pump
Repairs














250,000


10

Taylor


MI

Energy

Wind
Farm










10,000,000


20

Taylor


MI

Schools












5,000,000


50

Taylor


MI

Streets/Roads

Demoli3on
of
exis3ng
public
facility
and
construc3on
of
new
public
facility
to
meet
Title
9
needs.
Joint
School
 District/City
project
to
benefit
youth,
schools
and
residents
for
recrec3onal
purposes. Beech
Daly
Road
at
Brest
to
Walnut
‐
hot
in
place
with
2"
overlay.














352,000


10

Taylor


MI

Streets/Roads

Beech
Daly
Road
at
Van
Born
Road
to
Ecorse
Road
‐
hot
in
place
with
2"
overlay.














320,000


10

Taylor


MI

Streets/Roads

Brest
Road
west
of
Pardee
to
dead
end‐concrete
panel
replacement.














192,000


10

Taylor


MI

Streets/Roads
















50,000


10

Taylor


MI

Streets/Roads

Construc3on
of
new
sidewalks
on
Wick
Road
from
Beech
Daly
to
Telegraph.
Will
provide
neighborhoods
with
 safe
and
easy
access. Emmef
Street
east
of
Telegraph
to
dead
end
‐
concrete
panel
replacement.














230,400


10

Taylor


MI

Streets/Roads

Haskell
from
Pelham
to
Merrick
‐
concrete
panel
replacement.














500,000


15

Taylor


MI

Streets/Roads

Leroy
Street
from
Beech
Daly
to
Inkster
‐
concrete
panel
replacement.














599,400


15

Taylor


MI

Streets/Roads

Total
resurfacing
of
Brest
Road
from
Beech
Daly
to
Telegraph
Road.














653,000


15

Taylor


MI

Streets/Roads

Wick
Road
six
lane
miles
of
resurfacing.












1,000,000


15

Taylor


MI

Streets/Roads

Delta
Drive
total
reconstruc3on
from
Universal
Drive
to
Brest
Road.












1,300,000


30

Taylor


MI

Streets/Roads

Universal
Drive
total
reconstruc3on
from
Northline
Road
to
Brest
Road.












1,225,000


30

Taylor


MI

Streets/Roads

Trolley
Industrial
Drive
East
off
Monroe
to
dead
end
whitetopping
project.












1,713,000


40

Taylor


MI

Streets/Roads

50
miles
of
local
road
asphalt
resurfacing.












6,000,000


50

Taylor


MI

Streets/Roads

Fox
Crob
Subdivision
reconstruc3on
2.5
miles.












4,500,000


50

Taylor


MI

Streets/Roads

Local
neighborhood
soundwall
construc3on
at
I
94
and
Telegraph
as
required
by
the
Federal
Government.












3,000,000


50














160,000















230,000


City

State

Program

Taylor


MI

Water

Taylor


MI

Water

Taylor


MI

Water

Taylor


MI

Water

Taylor


MI

Water

Wayne

MI

Streets/Roads

Wayne

MI

Streets/Roads

Wayne

MI

Streets/Roads

Wayne

MI

Streets/Roads

Wayne

MI

Wayne

Project
Descrip3on Eliminate
gap
in
the
12"water
main
on
Inkster
Road
at
Wick
Road.
Extend
water
main
under
Wick
Road
to
 create
a
system
loop Extend
the
8"
water
main
along
Brest
Road,
west
of
Cape
Cod
to
connect
to
the
12"
water
main
along
Inkster
 Road.
This
will
eliminate
a
dead‐end
and
complete
the
loop
in
that
area.
768
linear
feet. Relining
of
exis3ng
water
main
8"
and
12"
throughout
the
City
of
Taylor

Funding
Required

Jobs
















70,000


10














150,000


10












5,000,000


20














750,000


20












1,000,000


20












1,000,000


12












2,000,000


25












2,000,000


25












3,000,000


35

Water

Annapolis
Road
From
Merriman
Road
to
Elizabeth
Street
‐
Defficient
Concrete
Pavement
Removal
&
 Repalacement Watermain
Replacement
Phase
IX












3,100,000


36

MI

Water

Watermain
Replacement
Phase
X












2,600,000


36

Wayne

MI

Water

Slipline
remainder
of
the
City's
Sanitary
Sewer
System










14,000,000


50

Westland

MI

CDBG












1,000,000


10

Westland

MI

CDBG














250,000


10

Westland

MI

CDBG














400,000


11

Westland

MI

CDBG














500,000


14

Westland

MI

CDBG














500,000


14

Westland

MI

CDBG














300,000


15

Westland

MI

Public
Safety

Central
City
Park
Environmental
Remedia3on
‐
 Remediate
contaminated
soil
in
Central
City
Park,
discoved
in
2006. Public
Facili3es
Renova3ons
‐
 Renova3ons
for
3
major
community
centers: Friendship
Senior
Center
‐
hosts
city
sponsored
senior
programming. Carpet,
pain3ng
(not
renovated
for
12
years) Dorsey
Center
‐
hosts
city
sponsored
youth
programs,
includin Concession
Building
Replacement.

Replace
the
exis3ng
concession
building
in
new
loca3on
aber
remedia3on
 of
brownsfield.
 Grand
Traverse,
Merriman
to
Venoy.

Pavement
replacement
with
storm
sewer
improvements
including
ditch
 work. Grand
Traverse,
Venoy
to
Wildwood.

Pavement
replacement
with
storm
sewer
improvements
including
ditch
 work. Reconstruc3on
of
Mathew
Street
‐
 Reconstruct
major
neighborhood
thoroughfare,
currently
in
delapidated
condi3on.

Reconstruc3on
will
 stabilize
this
main
artery
of
histric
african
american
community,
located
in
southeast
corner
of
the
city. 10
fully
marked
scout
cars
with
full
compliment
of
electronic
equipment

Westland

MI

Public
Safety

replace
30
in‐sta3on
PC's















120,000


2

Westland

MI

Public
Safety

replace
30
in‐car
computers
with
new
modems















200,000


4

Westland

MI

Public
Safety

8
cer3fied
emergency
dispatchers
to
supplement
our
two
city,
police
and
fire,
combined
dispatch














700,000


8

Westland

MI

Public
Safety












2,400,000


21

Westland

MI

Streets/Roads














350,000


10

Westland

MI

Streets/Roads

20
police
officers
to
bollster
patrol
response,
have
full
3me
crime
suppression
on
each
shib.
Also,
add
school
 resource
officer
and
community
police
officers.
The
hiring
list
is
ready
and
the
officers
can
be
added
as
soon
as
 funding
is
approved.
Also
ad Randy
Street
Resurfacing
and
reconstruc3on.

Select
slab
replacement
with
full
depth
reconstruc3on
of
 exis3ng
pavement. Cherry
Hill
and
Newburgh
intersec3on
moderniza3on.

Replace
exis3ng
pavement
and
upgrade
signal.














500,000


14

Westland

MI

Streets/Roads














565,000


16

Westland

MI

Streets/Roads














669,000


19

Westland

MI

Streets/Roads














860,000


24

Westland

MI

Streets/Roads














898,400


25

Westland

MI

Streets/Roads












1,200,000


34

Westland

MI

Streets/Roads












1,700,000


48

Westland

MI

Streets/Roads

Newburgh
Road
Preventa3ve
Maintenance
Program.

Rehab.
from
Palmer
to
Joy
Rd.
with
joint
sealing,
over
 banding,
concrete
base
repair,
and
overlay. Norma
Street
Reconstruct.

Replace
exis3ng
pavement
with
9"
concrete
cross‐sec3on,
and
repair
any
exis3ng
 infrastructure
problems. Mafhew
Street
Reconstruc3on.

Replace
failing
road
pavement,
water
main,
sanitary
and
storm
sewer.












1,743,000


49

Westland

MI

Streets/Roads

Wayne
Highlands
Drainage
Project.

Pave
exis3ng
roads
and
improve
storm
sewer
system
to
reduce
flooding.












2,200,000


62

Westland

MI

Streets/Roads










10,230,000


292

Westland

MI

Water

Gravel
Road
Resurfacing
Program.

Pave
exis3ng
gravel
roads
with
a
4"/8"
bituminous
pavement
or
a
7"
 concrete
pavement,
and
provide
storm
sewer. Norwayne
Sewer
CIP.

Reduc3on
of
cfs
in
CSO
area
37
based
on


sanitary
sewer
SSES
study.












1,000,000


28

Westland

MI

Water

Sanitary
Sewer
CIP.

Replace
old,
and
failing
infrastructure
of
the
City's
sanitary
sewer
system.












3,000,000


85

Westland

MI

Water










10,000,000


285

Arden
Hills

MN

CDBG

Foo3ng
Drain
Disconnect
Program.

Disconnect
1,000
homes
from
foo3ng
drain
discharge
into
the
sanitary
 sewer
system
and
reduce
treated
cfs.
 Neighborhood
Street
and
U3lity
Reconstruc3on












2,000,000


35

Arden
Hills

MN

CDBG










40,000,000


7500

Arden
Hills

MN

Streets/Roads














800,000


25

Arden
Hills

MN

Water

Installa3on
of
public
infrastructure
to
enable
redevelopment
of
585
acre
Federal
brownfield
site
(TCAAP)
into
a
 billion
dollar
mixed
use
development,
including
right
of
way
prep
involving
demoli3on
of
substandard
 buildings,
soil
correc3on,
and
grading. Bridge
improvements
over
a
trunk
highway
to
accommodate
pedestrian
movements
and
associated
 pathway/sidewalk
construc3on Sanitary
Sewer
Main
Lining
Project














250,000


15

Avon

MN

CDBG

Blafner
Drive
Improvements














300,000


6

Avon

MN

CDBG

Strazord
Avenue
Improvements














500,000


6

Avon

MN

CDBG

Street
Improvements














700,000


10

Avon

MN

Energy

LED
Street
Light
Conversion














125,000


6

Replace
8"
water
main
on
Pelham
Road
from
Pinecrest
to
Van
Born
with
12"
water
main.
This
will
eliminate
the
 sec3on
of
dead‐end
water
main
along
Van
Born,
east
of
Monroe,
and
create
another
ac3ve
connec3on
 between
the
northermost
sec3ons
of
the
City
w Replace
8"water
main
on
Pelham
Road
from
the
south
side
of
94
to
Van
Born
with
12"
water
main.
1575
linear
 feet. Newburgh
Road
from
Glenwood
Road
to
Michigan
Avenue
‐
Defficient
Concrete
Pavement
Removal
&
 Repalacement Elizabeth
Street
from
Glenwood
Road
to
Annapolis
Road
‐
Defficient
Concrete
Pavement
Removal
&
 Repalacement Second
Street
from
Glenwood
Road
to
Annapolis
‐
Defficient
Concrete
Pavement
Removal
&
Repalacement

Warren
Rd.
and
Newburgh
intersec3on
replacement
project.

Modernize
the
intersec3on
with
pavement
and
 poten3al
signal
improvements. Florence
Street.

Correct
exis3ng
drainage
problems
and
flooding
with
new
proposed
pavement
sec3on
and
 storm
sewer. Avondale,
Wayne
Rd.
to
Henry
Ruff.

Replacement
exis3ng
failing
public
road
with
new
pavement
and
subbase
 sec3on. Flamingo
Street
Reconstruc3on.

Replace
road
pavement
and
address
any
public
u3lity
issues.














350,000


City

State

Program

Avon

MN

Energy

Police
Garge
Engergy
Improvements,
Doors,
Window,
Insula3on

Project
Descrip3on

Funding
Required 














50,000


Jobs

Avon

MN

Public
Safety

Fire
Department‐800
Mhz
Radios
















50,000


2

Belgrade

MN

CDBG

City
Hall
Building
Improvements














100,000


4

Belgrade

MN

CDBG

Storm
Sewer
Replacement
along
TH
71














500,000


6

Belgrade

MN

CDBG

Downtown
Redevelopment‐Building
Rehab












1,000,000


40

Belgrade

MN

Housing

Public
Housing
Rehab,
including
energy
improvements














100,000


4

Belgrade

MN

Water

Sewer
Rehab‐
Replace
aging
clay
pipe
to
reduce
I&I
and
reduce
sewer
backups
from
root
intrusion












1,000,000


12

Belgrade

MN

Water

Water
Treatment
Facility












1,200,000


30

Burnsville

MN

CDBG

City
Hall
Roof
Replacment














451,000


4

Burnsville

MN

CDBG

Nicollet
Commons
Water
Feature
Rehab














550,000


5

Burnsville

MN

CDBG

Fire
Sta3on
Number
1
Addi3on














600,000


6

Burnsville

MN

CDBG

Youth
Center
Addi3on












1,100,000


10

Burnsville

MN

Energy

Greenhouse
Gas
Tracking
Program
















50,000


1

Burnsville

MN

Energy

Energy
Audits
on
All
Public
Buildings














100,000


2

Burnsville

MN

Energy

Sustainability
Model
for
Renovated
Youth
Center












1,000,000


5

Burnsville

MN

Energy

Geo‐Thermal
Replacement
for
Ice
Center
Compressor












4,300,000


40

Burnsville

MN

Public
Safety

Drug
Task
Force
Addi3on














150,000


1

Burnsville

MN

Public
Safety

Evidence
/
Property
Room
Technology
Upgrades














238,000


1

Burnsville

MN

Public
Safety

Gang
Task
Force
Unit














275,000


2

Burnsville

MN

Public
Safety

Mul3‐Family
Housing
Manpower
Unit














284,000


2

Burnsville

MN

Public
Safety

Retail
Crime
Manpower
Unit














245,000


2

Burnsville

MN

Public
Safety

Surveilance
Camera
Technology
Upgrades














185,000


2

Burnsville

MN

Public
Safety

Dispatch
Computer
Aided
Dispatch
&
Records
Management
Sobware
Upgrade












2,500,000


25

Burnsville

MN

Schools

Hidden
Valley
Ext
Masonry
Repair














148,000


3

Burnsville

MN

Schools

Rahn
Elementary
Roof
Replacement














378,000


5

Burnsville

MN

Schools

Hanson
Field
Turf
Replacement












1,100,000


10

Burnsville

MN

Schools

Sky
Oaks
Elementary
Roof
Replacment












1,085,000


12

Burnsville

MN

Schools

Telecommunica3ons
System
Replacement












1,000,000


12

Burnsville

MN

Schools

M
W
Savage
Elementary
Roof
Replacement












1,338,000


15

Burnsville

MN

Schools

Metcalf
Junior
High
School
Remodeling












6,031,000


75

Burnsville

MN

Schools

Burnsville
Senior
High
Phase
I
Remodeling












6,357,000


80

Burnsville

MN

Streets/Roads

Pedestrian
Overpass
‐
TH
13
/
Diffley












1,500,000


15

Burnsville

MN

Streets/Roads

Pedestrian
Overpass
‐
TH
13
/
Nicollet
Ave












1,500,000


15

Burnsville

MN

Streets/Roads

I35W
‐
118th
St
Interchange‐Prelim
Design












3,000,000


30

Burnsville

MN

Streets/Roads

Chowen
Intersec3on












9,500,000


100

Burnsville

MN

Streets/Roads

CSAH
5
‐
CSAH
32
Interconnector
‐
Environmental
&
Right
of
Way










20,000,000


200

Burnsville

MN

Streets/Roads

T
H
13
/
CSAH
5
Interchange
‐
Final
Design
&
Right
of
Way










27,000,000


250

Burnsville

MN

Water

Lib
Sta3on
Rehabilita3on














200,000


2

Burnsville

MN

Water

Water
Treatment
Plant
HVAC
Upgrades














225,000


2

Burnsville

MN

Water

Reservoir
Pump
Efficiency
Upgrades














360,000


4

Chanhassen

MN

CDBG

City
Hall
Parking
Lot
Improvements














280,000


15

Chanhassen

MN

CDBG

Well
#
13
Parking
Lot
and
water
qualiity
Improvements

Chanhassen

MN

CDBG

Annual
Street
Improvements

Chanhassen

MN

CDBG

West
Lotus
Lake
Drainage
Imp.

Chanhassen

MN

CDBG

Chanhassen

MN

Chanhassen

8
















90,000


20












1,665,000


25














475,000


25

Audubon
Street
Reconstruc3on
Project
(Lyman
Blvd.
to
Lake
Drive)












3,000,000


45

CDBG

Fire
Sta3on
#3












2,000,000


75

MN

CDBG

Lyman
Blvd
Improvements
Phase
#2












5,300,000


75

Chanhassen

MN

CDBG

Public
Works
Facililty
Improvements












8,300,000


135

Chanhassen

MN

Streets/Roads

TH
5
and
Minnewashta
Parkway
(Intersec3on
Safetly
Improvements)

Chanhassen

MN

Transit

Downtown
Transit
Sta3on
Site
Improvements

Chanhassen

MN

Water

Chanhassen

MN

Chanhassen














500,000


25












1,845,000


35

Sanitary
Lib
Sta3on
Rehabila3on
at
various
sta3ons














350,000


20

Water

Dell
Road
/77th
Street
Sanitary
Forcemain
Replacement














125,000


25

MN

Water

Dell
Road/
77th
Street
Watermain
Replacement














185,000


25

Chanhassen

MN

Water

Sanitary
Sewer
Inflow/Infiltra3on
Abatement














600,000


25

Chanhassen

MN

Water

Well
#4
Improvements
‐
Radium,
Iron
and
Manganese
removal














930,000


35

Chanhassen

MN

Water

Sanitary
Sewer
Lib
Sta3on
#32
Improvments












1,900,000


45

Chanhassen

MN

Water

Melody
Hills
Water
Tower
(High
Zone)
Improvements












2,150,000


60

Chanhassen

MN

Water

West
Water
Treatment
Plant
Improvements
(removal
of
Iron
and
Manganese
from
raw
water)










11,000,000


175

Duluth

MN

Airport

DYT
fuel
and
security
upgrades














125,000


15

Duluth

MN

Airport

DYT
apron
reconstruc3on














650,000


20

Duluth

MN

Airport

Passenger
loading
bridges












1,500,000


25

Duluth

MN

Airport

Terminal
design
phase
2












2,000,000


25

Duluth

MN

Airport

Install
fiberop3c
cables














700,000


28

Duluth

MN

Airport

Rwy
3/21
C,
D
ligh3ng












1,500,000


52

Duluth

MN

Airport

Construct
runway
approach










10,000,000


80

Duluth

MN

Airport

Reconstruct
Txwy
C,
D,
A2w












4,000,000


85

Duluth

MN

Airport

Rwy
9/27
Panel
Recl.










16,000,000


85

Duluth

MN

Airport

Txy
A
realignment










11,000,000


85

Duluth

MN

Airport

Terminal
road,
parking
and
u3li3es












8,978,000


90

Duluth

MN

Airport

Terminal
Building
Construc3on










20,900,000


300

City

State

Program

Duluth

MN

CDBG

Energy
resource
incubator
for
small
business

Project
Descrip3on

Duluth

MN

CDBG

Overhead
door
replacement‐fire
halls

Duluth

MN

CDBG

ADA
elevator
upgrades‐city
hall,
skywalks,
library

Duluth

MN

CDBG

Duluth

MN

Duluth

Funding
Required 












500,000


Jobs 10














375,000


12












2,485,000


14

Technical
assistance
to
small
business














160,000


16

CDBG

Storefront
renova3ons
for
small
business














300,000


21

MN

CDBG

Lakewalk
extension
‐
Beacon
Point












2,000,000


25

Duluth

MN

CDBG

Neighborhood
revitaliza3on‐lateral
sewer
lines












1,000,000


25

Duluth

MN

CDBG

Fleet
maintenance
energy
reclaimer












3,250,000


34

Duluth

MN

CDBG

Lakewalk
extension
‐
60th
Avenue
East












4,878,000


48

Duluth

MN

CDBG

Harbor
Highlands
phase
IV












1,500,000


50

Duluth

MN

CDBG

Public
farmers'
market
construc3on












2,000,000


60

Duluth

MN

CDBG

Fire
sta3on
replacement‐Park
Point,
Gary,
Duluth
Heights












3,789,000


90

Duluth

MN

Energy

Eliminate
Duluth
Steam
District
1
vaults














120,000


5

Duluth

MN

Energy

Duluth
Steam
District
1
stack
repairs














400,000


6

Duluth

MN

Energy

Lowell
School
energy
improvements












1,379,902


8

Duluth

MN

Energy

Homecrob
school
energy
improvements












1,433,688


9

Duluth

MN

Energy

Central
steam
conversion
for
mul3‐family
rental














400,000


10

Duluth

MN

Energy

Lake
Avenue
convert
steam
line
to
hot
water
line

Duluth

MN

Energy

City
Hall
hot
water
solar
arrays

Duluth

MN

Energy

Wind
genera3on
system
for
mul3‐family
rental

Duluth

MN

Energy

Duluth

MN

Duluth














750,000


12












1,485,000


14














800,000


17

Replace
city
hall
windows












1,420,250


18

Energy

Library
Mechanical
System
Replacement
&
Upgrade












1,200,000


20

MN

Energy

Wind
turbines
Spirit
Mountain
and
East
toolhouse












1,768,500


28

Duluth

MN

Energy

Fire
halls
ground
water
heat
source
and
emergency
wind
turbine
power












2,750,000


34

Duluth

MN

Energy

Boiler
upgrades/moderiza3ons
of
city
structures












2,685,000


38

Duluth

MN

Energy

Denfeld
school
energy
improvements












6,329,180


38

Duluth

MN

Energy

Public
and
private
building
energy
retrofits












3,500,000


40

Duluth

MN

Energy

Solar
powered
hot
water
boosters
‐
water
treatment
plant












4,800,000


40

Duluth

MN

Energy

Community
centers
geothermal
energy
systems‐Piedmont,
Portman,Irving












4,126,000


48

Duluth

MN

Energy

Solar
hot
water
reclaiming
system
at
Garfield
and
42nd
toolhouses












3,685,000


48

Duluth

MN

Energy

Heat
reclama3on,
geothermal
and
centralized
heat
source
at
zoo












5,600,000


50

Duluth

MN

Energy

Community
housing
weatheriza3on/retrofits












7,950,000


95

Duluth

MN

Housing

Clean
Ductwork
at
Six
Highrises














125,000


5

Duluth

MN

Housing

Replace
Windows
at
Grandview
Manor














400,000


6

Duluth

MN

Housing

Replace
Siding
on
25
Scafered
Site
Homes














500,000


7

Duluth

MN

Housing

Replace
Stoves
&
Refrigerators
in
all
Public
Housing
Units
with
energy
efficient
models














900,000


7

Duluth

MN

Housing

Boiler
Upgrades
at
Midtowne
Manor
I
&
II

Duluth Duluth

MN MN

Housing Housing

Replace
Kitchen
Cabinets
&
flooring
at
26
scafered
site
duplex
units Replace
Spalling
Brick
on
Ramsey
Manor














800,000
 












800,000


10 12












1,000,000


12

Duluth

MN

Housing

Elevator
Upgrades
at
Midtowne
Manor
II,
Lincoln
Center,
Ramsey
Manor
&
Grandview
Mannor












1,850,000


14

Duluth

MN

Housing

Public
Space
Upgrades
at
Tri‐Towers














450,000


14

Duluth

MN

Housing

Replace
Interior
Entry
and
Closet
Doors/locks
at
six
high‐rises












1,425,000


14

Duluth

MN

Housing

Upgrade
Bathrooms
&
Replace
Apartment
flooring
at
Grandview
Manor














700,000


14

Duluth

MN

Housing

Replace
Kitchen
Cabinets
and
Apartment
flooring
at
Midtwone
Manor
II












1,600,000


16

Duluth

MN

Housing

Replace
Roof
and
Siding
&
install
Front
Porches
on
26
scafered
site
duplex
units














765,000


16

Duluth

MN

Housing

Replace
Kitchen
Cabinets,
flooring
and
rear
entry
storm
doors
at
Fairmont
Homes














710,000


18

Duluth

MN

Housing

Re‐skin
exterior
of
Midtowne
Manors
I
&
II












4,500,000


18

Duluth

MN

Housing

Upgrade
Bathrooms
and
replace
apartment
flooring
at
King
Manor














800,000


20

Duluth

MN

Housing

Upgrade
Bathrooms
and
replace
apartment
flooring
at
Midtowne
Manor
I












1,700,000


22

Duluth

MN

Housing

Upgrade
Bathrooms
and
replace
apartment
flooring
at
Ramsey
Manor












1,700,000


22

Duluth

MN

Housing

Lead
Abatement
&
Moderniza3on
of
10
Scafered












1,700,000


30

Duluth

MN

Housing

Upgrade
Bathrooms
and
replace
apartment
flooring
at
Tri‐Towers












2,750,000


35

Duluth

MN

Public
Safety

Computer
forensics
inves3gator
















60,000


1

Duluth

MN

Public
Safety

Crime
analyst
















60,000


1

Duluth

MN

Public
Safety

Community
policing
ini3a3ve














500,000


6

Duluth

MN

Public
Safety

Joint
public
safety
facility
construc3on










14,300,000


144

Duluth

MN

Schools

New
western
middle
school












4,000,000


24

Duluth

MN

Schools

Lowell
school
renova3on












6,329,180


38

Duluth

MN

Schools

Ordean
stadium












6,266,391


38

Duluth

MN

Schools

New
Lester
Park
school












7,000,000


42

Duluth

MN

Schools

Homecrob
school
addi3on/renova3on












7,166,994


43

Duluth

MN

Schools

New
Laura
McArthur
school










10,500,000


63

Duluth

MN

Schools

Denfeld
school
addi3on/renova3on










11,670,820


70

Duluth

MN

Schools

Ordean
school
addi3on/renova3on










23,500,000


141

Duluth

MN

Streets/Roads

Salt
Brine
Spreaders
(9)
for
Snow
Plows












8,500,000


0

Duluth

MN

Streets/Roads

Relocate
railroad
track
siding
for
Lakeside
train
sta3on














250,000


6

Duluth

MN

Streets/Roads

Lincoln
Park
Drive
Bridge
replacement














700,000


10

Duluth

MN

Streets/Roads

MSA
Street
recondi3oning












8,500,000


10

Duluth

MN

Streets/Roads

Replacetemporary
signals
at
mul3ple
loca3ons














900,000


10

Duluth

MN

Streets/Roads

Second
St.
Bridge
at
13th
Avenue
East














750,000


10

City

State

Program

Duluth

MN

Streets/Roads

26th
Ave.
West
Bridge
over
Miller
Creek

Project
Descrip3on

Funding
Required 










1,500,000


Jobs 15

Duluth

MN

Streets/Roads

Duluth

MN

Streets/Roads

Aerial
Lib
Bridge
Pain3ng












5,000,000


15

Chris
Jensen
site
road












1,100,000


Duluth

MN

18

Streets/Roads

Knife
River
Bridge
replacement












1,300,000


Duluth

18

MN

Streets/Roads

Rice
Lake
Road
mill
and
overlay












1,400,000


20

Duluth

MN

Streets/Roads

Woodland
Avenue
reconstruc3on
(Kent
to
Arrowhead)












2,000,000


20

Duluth

MN

Streets/Roads

Street
pedestrian
safety
improvements










10,000,000


45

Duluth

MN

Transit

Duluth
Transit
Authority
technology
projects














427,000


6

Duluth

MN

Transit

Duluth
Transit
Authority
energy
projects














540,000


8

Duluth

MN

Transit

Facility
improvements














796,000


11

Duluth

MN

Transit

Depot
train
garage
roof
replacement














500,000


18

Duluth

MN

Transit

West
Duluth
rail












2,050,000


32

Duluth

MN

Transit

East
Duluth
rail
project










16,950,100


224

Duluth

MN

Transit

Downtown
fixed
rail
trolley










24,000,000


336

Duluth

MN

Transit

Transit
connec3vity
plazorm










31,800,000


445

Duluth

MN

Water

Arlington
booster
sta3on












2,300,000


10

Duluth

MN

Water

Arlington
transmission
line












3,500,000


10

Duluth

MN

Water

Highland
booster
sta3on












1,500,000


10

Duluth

MN

Water

Water
main
replacement














800,000


10

Duluth

MN

Water

Riverside
u3lity
project












2,500,000


20

Duluth

MN

Water

West
Duluth
reservoir












3,000,000


25

Duluth

MN

Water

Endion
sanitary
sewer
overflow












6,000,000


30

Duluth

MN

Water

Spirit
Mountain
snowmaking
and
maintenance
facility












6,000,000


70

Edina

MN

CDBG

Well
Rehabilita3on
‐
#13














150,000


6

Edina

MN

CDBG

Rehabilitate
Lib
Sta3ons
‐
1,
2,
&
7














350,000


15

Edina

MN

CDBG

Public
Works
Maintenance
Facility










14,000,000


150

Edina

MN

Streets/Roads

Bridge
‐
West
56th
Street
over
Minneahaha
Creek














400,000


26

Edina

MN

Streets/Roads

Bridge
‐
West
54th
Street
over
Minnehaha
Creek














550,000


34

Edina

MN

Streets/Roads

Mill
and
Overlay
‐
Benton
Ave,
Blake
Rd,
W
69th
St,
W
70th
St












1,877,000


126

Hanover

MN

CDBG

Historic
Bridge‐redecking














125,000


4

Hanover

MN

CDBG

Hanover
Bicycle
&
Pedestrian
Trail
‐
Phase
2














300,000


6

Hanover

MN

CDBG

Pearson
Industrial
Park
Development‐provide
sewer
and
water
service
to
enhance
development
opportuninty














400,000


8

Hanover

MN

CDBG

Public
Works
Building














750,000


12

Hanover

MN

CDBG

Pheasant
Run
Sewer
Extension,
Eliminate
Failing
Sep3c
Systems












1,500,000


17

Hanover

MN

CDBG

Whitetail
Lane‐
Sewer
and
Water
Extension,
eliminate
failing
sep3c
systems












1,500,000


17

Hanover

MN

CDBG

Hanover
Hills
Sewer
and
Water
Extension,
Eliminate
failing
sep3c
systems












2,500,000


28

Hanover

MN

CDBG

SE
Annexa3on
Area
Sewer
&
Water
‐
Phase
1












3,500,000


39

Hanover

MN

Energy

LED
Street
Light
Conversion

Hanover

MN

Streets/Roads

Hanover

MN

Hugo

MN

Hugo

MN

Streets/Roads

Hugo

MN

Streets/Roads

Hugo

MN

Water

Hugo

MN

Water

Hugo

MN

Water

Isle


MN

CDBG

Isle


MN

Streets/Roads

TH
61
Watermain
Loop:

The
construc3on
of
a
12‐inch
watermain
loop
from
136th
Street
to
130th
Street
along
 TH
61
to
assist
with
pressures
and
fireflows
following
the
construc3n
of
a
new
water
tower
and
well. New
Water
Tower
No.
4:

The
construc3on
of
a
new
1.5
million
gallon
composite
water
tower
to
meet
the
 City's
projected
average
day
demands
as
recommended
by
the
Ten‐State
Standards. New
Well/Well
House
No.
6:

The
construc3on
of
a
new
well
and
well
house
to
meet
the
City's
projected
peak
 water
demands
as
recommended
by
the
Ten‐State
Standards
and
the
Department
of
Natural
Resources. Merit
Enterprise
Rebuilding
Assistance.

Funds
to
assist
Merit
Enterprise
in
rebuilding
in
the
City
of
Isle
aber
 fire
destroyed
their
building.
Funds
will
be
used
to
offset
infrastructure
costs
to
rebuild
in
a
new
industrial
 park. Malone
Island
Bridge
Replacement

Isle


MN

Streets/Roads

Industrial
Park
Street
and
Storm
Sewer

Isle


MN

Water

Sewer
extension
to
Fire
Hall
and
other
residences
to
elimnate
a
failing
sep3c
systems

Isle


MN

Water

Isle


MN

Isle


MN

Mahtomedi














750,000


8

River
Road
NE
Reconstruc3on
and
Drainage
Improvements












1,500,000


18

Streets/Roads

8th
Street
Industrial
Park
Road
Extension












2,000,000


22

Streets/Roads

TH
61/130th
Street:

Intersec3on
Safety
Improvements
including
addi3on
of
turn
lanes
on
TH
61,
Widening
 130th
Street,
Grading,
Drainage
improvements
and
a
Traffic
Signal
System. TH
61/147th
Street:

Intersec3on
Safety
Improvements
including
addi3on
of
turn
lanes
on
TH
61,
Widening
 147th
Street,
re‐striping
TH
61,
Grading,
Curb
and
Gufer,
Drainage
improvements
and
a
Traffic
Signal
System. Bald
Eagle
Bridge














790,000


75












1,900,000


75














441,000


100














175,000


50












3,800,000


125












1,500,000


125














150,000


4














750,000


10












1,000,000


14














500,000


8

North
End
Sewer
and
Watermain
Extension












1,000,000


12

Water

Mille
Lacs
Band
of
Ojibwe
Sewer
and
Watermain
Extension
to
eliminate
failing
sep3c
systems












1,500,000


17

Water

Industrial
Park
Sewer
and
Watermain
Extension












2,500,000


28

MN

Streets/Roads

Mill
&
Overlay:

Roadway
mill
and
overlay
of
Hallam
Avenue,
Wedgewood
Drive,
and
Wildridge
Drive.














620,000


50

Mahtomedi

MN

Streets/Roads














200,000


75

Mahtomedi

MN

Water

Mahtomedi

MN

Water

TH
244
at
Old
Wildwood
Road:

Intersec3on
Safety
Improvements
including
widening
of
TH
244
for
a
By‐pass
 lane
and
right
turn
lane,
realignment
of
Old
Wildwood
Road,
Grading
and
Drainage
improvements
within
 exis3ng
right
of
way
and
easements. Tamarack
Lib
Sta3on
Rehabilita3on:

Rehabilita3on
of
an
exis3ng
lib
sta3on
with
the
construc3on
of
a
new
wet
 well,
valve
vault,
and
control
system. Well
House
No.
4
Rehabilita3on:

The
construc3on
of
a
well
house
to
replace
the
exis3ng
well
house.

Melrose

MN

CDBG

Melrose

MN

CDBG

Melrose Melrose Melrose

MN MN MN

CDBG Energy Energy

Turkey
Lane
Reconstruc3on Public
Works
Energy
Improvements LED
Street
Light
Conversion














300,000


20














800,000


125

1st
Street
South
to
Industrial
Park
Construc3on














700,000


6

5th
Street
North
Reconstruc3on














500,000
 












500,000
 














75,000
 












250,000


6 6 4 6

City

State

Program

Melrose Melrose Minneapolis Moorhead Moorhead

MN MN MN MN MN

Public
Safety Water Water Streets/Roads Streets/Roads

800
mhz
Radio
System Water
Treatment
Facility Tunnel
Rehabilita3on
Project‐10th
Avenue
Southeast
Tunnel
System
‐
The
10th
Avenue
Tunnel
system
was
built
 20th
Ave
S,
14‐20th
St
Resurfacing 24th
Ave
S,
Rivershore
Dr‐10th
St
Recondi3oning

Project
Descrip3on

Funding
Required 














50,000
 










6,500,000
 










1,300,000
 












300,000


Jobs














500,000


10

Moorhead

MN

Streets/Roads

4th
Ave
S,
14th
St‐SE
Main
Ave
Recondi3oning














550,000


15

Moorhead

MN

Streets/Roads

15th
Ave
N,
Red
River
to
TH
75
Resurfacing














700,000


20

Moorhead

MN

Streets/Roads

20th
Ave
S,
5‐11th
St
Recondi3oning














800,000


20

Moorhead

MN

Streets/Roads

4th
Ave
S,
21‐34th
St
Recondi3oning














900,000


20

Moorhead

MN

Streets/Roads

Main
Ave,
14‐18‐1/2
St
Recondi3oning












1,200,000


20

Moorhead

MN

Streets/Roads

1st
Ave
N,
TH
10
to
Red
River
Resurfacing












2,250,000


25

Moorhead

MN

Streets/Roads

SE
Main
Ave,
Oak
Way‐I‐94
Resurfacing












1,700,000


25

Moorhead

MN

Streets/Roads

SE
Main
Ave/20th
St/21st
St
Railroad
Grade
Separa3on










35,000,000


100

New
Munich

MN

Water

Expand
Wastewater
Treatment
Ponds














700,000


8

Princeton

MN

CDBG

Mobile
Home
Park
Sewer/Water/Street
Improvements












1,500,000


18

Princeton

MN

CDBG

North
Sewer,Water,
Storm
Sewer,
Street
Improvements‐
Fire
Protec3on












3,500,000


27

Princeton

MN

CDBG

Public
U3lity‐
Maintenance
Shop












1,700,000


38

Princeton

MN

CDBG

Public
Safety
Building‐Emergency
Opera3on
Center












6,200,000


68

Princeton

MN

Energy

Public
Works
Facitlity
Energy
Imrovements
















75,000


2

Princeton

MN

Energy

4th
Avenue
‐
Energy
Improvements














100,000


6

Princeton

MN

Energy

Downtown
Energy
Efficient
Ligh3ng














250,000


6

Princeton

MN

Energy

Public
U3lity
Facility
Energy
Improvements,
Insula3on,
Roof,
Hea3ng














350,000


6

Princeton

MN

Public
Safety

Patrol
Officer
















65,000


1

Princeton

MN

Public
Safety

800
mhz
Radio
System
Upgrade
















75,000


3

Princeton

MN

Streets/Roads

Dunn
Bridge
Replacement












1,250,000


15

Princeton

MN

Streets/Roads

21st
Avenue
Extension












1,500,000


20

Princeton

MN

Streets/Roads

North
Princeton
Street
Rehabilita3on
Project
including
storm
sewer
and
pavement
replacement












3,500,000


39

Princeton

MN

Water

North
End
Watermain
Looping‐
Fire
Protec3on
and
Supply












3,500,000


39

Princeton

MN

Water

Wastewater
Treatment
Plant
Expansion










18,000,000


200

Richfield

MN

CDBG










22,250,000


250

Richfield

MN

Streets/Roads














250,000


7

Richfield

MN

Streets/Roads














360,000


12

Richfield

MN

Streets/Roads












3,000,000


58

Richfield

MN

Streets/Roads










20,000,000


680

Rosemount

MN

Streets/Roads

Construc3on
of
a
new
Police/Fire/City
Hall
facility
to
replace
a
1960's
era
deficient
building.
The
new
facility
 will
significantly
improve
indoor
air
quality,
increase
efficiency
of
opera3ng
systems
&
incorporate
sustainable
 strategies. 77th
Street
and
Colfax
Avenue
Traffic
Signal
‐
the
objec3ve
of
this
project
is
to
provide
improved
access
to
a
 major
shopping
center
in
Richfield. Countdown
Timers
on
Pedestrian
Signals
‐
to
provide
pedestrian
countdown
3mers
on
the
City's
signals
 improving
safety
for
pedestrians.

Countdown
3mers
will
be
required
at
all
signals
that
accommodate
 pedestrians
within
ten
years. Richfield
Parkway
‐
to
provide
a
"complete
street"
network
improving
access
between
Richfield
and
South
 Minneapolis.

The
roadway
would
provide
the
link
to
the
Three
Rivers
Park
Regional
Trail
and
Cedar
Avenue
 Trail
to
the
Minneapolis
Grand
Rounds. 77th
Street
Underpass
‐
to
provide
local
and
regional
access
between
Richfield,
the
Interna3onal
Airport,
City
 of
Bloomington,
and
the
Mall
of
America.

Con3nuing
77th
Street
to
the
east
would
create
a
successful
and
 viable
I‐494
reliever/frontage
road, TH
3
at
145th
Street
and
143rd
Street‐install
new
signal
system
and
add
turn
lanes
on
state
highway.














400,000


30

Rosemount

MN

Streets/Roads

TH
3
at
Canada
Avenue‐Add
turn
lanes
on
state
highway
for
safety
improvements.














430,000


30

Rosemount

MN

Streets/Roads

Boulder
Path
Extension‐2700
linear
foot
collector
road
extension
with
u3li3es.












1,500,000


50

Rosemount

MN

Streets/Roads












2,200,000


75

Rosemount

MN

Streets/Roads












3,700,000


100

Rosemount

MN

Transit

Biscayne
Avenue
‐
Boulder
Trail
to
CSAH
46‐4000
linear
foot
collector
road
upgrade
from
gravel
to
urban
paved
 street
sec3on
with
u3li3es. CSAH
73
‐
CSAH
42
to
Bonaire
Path‐1
mile
of
county
road
upgrade
from
gravel
to
urban
paved
street
sec3on
 with
u3li3es. Downtown
Park
and
Ride
lot
construc3on
for
bus
transit
service
within
the
city
of
Rosemount.

Rosemount

MN

Water

Roseville

MN

Roseville

MN

Roseville

4 72 20 10














385,000


40

Northwest
Water
Treatment
Plant
Construc3on
‐
development
of
new
water
treatment
plant.










10,000,000


250

CDBG

community
building
at
Arboretum












1,500,000


30

CDBG

4
neighborhood
centers
at
Parks












2,000,000


40

MN

CDBG

replace
clubhouse
and
maintenance
shop
at
Golf
Course












1,500,000


40

Roseville

MN

Energy

Geothermal
energy
expansion
to
city
center
campus












2,000,000


50

Roseville

MN

Public
Safety














120,000


1

Roseville

MN

Streets/Roads

The
Roseville
Police
Department
is
reques3ng
funds
to
add
a
dedicated
commercial
patrol
officer
to
its
roster. The
City
of
Roseville
is
home
to
a
large
number
of
shopping
areas‐‐the
largest
center
being
Rosedale
(the
2nd
 largest
mall
in
Minnesota
with
o

Roseville

MN

Streets/Roads

Twin
Lakes
Parkway
construc3on
to
provide
a
regional
link
to
interstate
highway
system










15,000,000


500

Roseville

MN

Water

water
and
wastewater
mainline
replacement
and
rehabilita3on












2,000,000


50

Shorewood

MN

CDBG

Lake
Mary
storm
water
and
flood
mi3ga3on














500,000


5

Shorewood

MN

CDBG

Park
shelter
and
warming
house
reconstruc3on














250,000


10

Shorewood

MN

CDBG

Tennis
court
improvement
and
rehabilitatoin

Shorewood

MN

CDBG

Municipal
road
reconstruc3on

Shorewood

MN

CDBG

Silver
Creek

MN

Silver
Creek














300,000


10












1,500,000


15

Wet
Land
Restora3on
and
educa3on
center














600,000


15

CDBG

Cur3s
Avenue
Reconstruc3on














500,000


3

MN

CDBG

Barton
Avenue
Reconstruc3on














500,000


4

Silver
Creek

MN

CDBG

155th
Street
Reconstruc3on














700,000


5

Silver
Creek

MN

CDBG

127th
Street
Reconstruc3on














800,000


6

St.
Augusta

MN

Streets/Roads

Realign
43rd
Avenue
and
County
Road
136














150,000


10

St.
Augusta

MN

Water

Drill
Well















200,000


4

City

State

Program

St.
Cloud

MN

Airport

Jet
Bridge
for
St.
Cloud
Regional
Airport
Terminal
Building

Project
Descrip3on

St.
Cloud

MN

Airport

Inset
pavement
ligh3ng
at
St.
Cloud
Regional
Airport

St.
Cloud

MN

CDBG

St.
Cloud

MN

CDBG

St.
Cloud

MN

St.
Cloud

Funding
Required 












600,000


Jobs 8












1,500,000


19

University
Drive
Boulevard
Beau3fica3on
Project














150,000


2

East
Lake
Boulevard
Project














500,000


6

CDBG

Skate
Plaza
Improvement














750,000


9

MN

CDBG

Breckenridge
and
Cooper
Avenue
Trail
Connec3on
to
Lake
Wobegon
Trail














800,000


10

St.
Cloud

MN

CDBG

10th
Avenue
North
Area
Neighborhood
Rehabilita3on












1,800,000


23

St.
Cloud

MN

CDBG

10th
Avenue
North
Area
Neighborhood
Rehabilita3on
‐
Phase
2












3,750,000


40

St.
Cloud

MN

CDBG

22nd
Avenue
North
Neighborhood
Rehabilita3on












4,500,000


45

St.
Cloud

MN

Energy

Emergency
Standby
Generator
for
Central
Maintenance
Facility














115,000


2

St.
Cloud

MN

Energy

Energy
efficient
window
upgrade
to
City
Hall
Building
with
Atrium














130,000


2

St.
Cloud

MN

Energy

HVAC
Control
for
City
Hall
Building
















70,000


2

St.
Cloud

MN

Energy

Geo‐Thermo
Heat
System
for
Central
Maintenance
Facility














400,000


5

St.
Cloud

MN

Energy

Boiler
and
Roof
Replacement
‐
Wastewater
Treatment
Facility












1,860,000


23

St.
Cloud

MN

Energy

UV‐Disinfec3on
and
Emergency
Generator
Project
‐
Wastewater
Treatment
Facility












8,661,000


108

St.
Cloud

MN

Streets/Roads














100,000


2

St.
Cloud

MN

Streets/Roads

Intersec3on
of
9th
Ave
S
(Route
145)
and
16th
St
S
(Route
129)
‐
Signal
system
upgrade
including
system
 controller,
video
detec3on
and
pedestrian
countdown
3mers State
Aid
Route
132
(25th
Ave)
‐
1st
St
N
to
3rd
St
N
‐
Par3al
depth
mill
and
overlay














100,000


2

St.
Cloud

MN

Streets/Roads

Street
name
upgrade
program














150,000


2

St.
Cloud

MN

Streets/Roads

Intersec3on
of
25th
Ave
N
(Route
132)
and
3rd
St
N
(Route
135)
‐
Full
signal
system
replacement














215,000


3

St.
Cloud

MN

Streets/Roads

Intersec3on
of
7th
Ave
S
(Route
110)
and
1st
St
S
(Route
118)
‐
Full
signal
system
replacement














215,000


3

St.
Cloud

MN

Streets/Roads

State
Aid
Route
123
(Washington
Memorial
Drive)
‐
11th
St
S
to
CSAH
75
‐
Full
reconstruc3on
of
roadway














320,000


4

St.
Cloud

MN

Streets/Roads

State
Aid
Route
145
(9th
Ave)
‐
8th
St
N
to
15th
St
N
‐
full
depth
mill
and
reconstruc3on
of
asphalt
surface














650,000


8

St.
Cloud

MN

Water

54th
and
38th
Avenue
Interceptor














190,000


3

St.
Cloud

MN

Water

Lincoln
Avenue
Rehabilita3on/Lining
Project














246,000


3

St.
Cloud

MN

Water

Main
Forcemain
Inspec3on














150,000


3

St.
Cloud

MN

Water

Collec3on
System
SCADA
Programming
&
Installa3on














300,000


4

St.
Cloud

MN

Water

Upper
Pan
Interceptor
Lining
Project














840,000


11

St.
Cloud

MN

Water

Northway
Libsta3on
Rehabilita3on












1,300,000


16

St.
Cloud

MN

Water

Metro
Interceptor
Rehabilita3on
Project












1,500,000


19

St.
Cloud

MN

Water

Lower
Pan
Interceptor
Lining
Project












2,000,000


25

St.
Cloud

MN

Water

Vacuum
Pump
Libsta3on
Replacements
(5)












2,000,000


25

St.
Cloud

MN

Water

Water
Treatment
Facility
Rehabilita3on
and
Improvement
Project












5,825,000


70

St.
Louis
Park

MN

Energy












5,058,886


50

St.
Louis
Park

MN

Streets/Roads

Street
Light
Project
M‐XX10
‐
System
Replacement.

This
project
would
replace
the
street
light
systems
which
 have
reached
their
life
expectancy.

It
would
also
achieve
energy
efficiencies
by
replacing
all
high
pressure
 sodium
fixtures
in
the
city's
street Traffic
signals
‐
pain3ng
and
rou3ne
maintenance
















49,220


5

St.
Louis
Park

MN

Streets/Roads

Street
Projects
‐
maintenance,
rehabilita3on
and
reconstruc3on
of
city
and
MSA
streets












2,771,303


60

St.
Louis
Park

MN

Streets/Roads












9,200,000


200

St.
Louis
Park

MN

Transit
















48,966


5

St.
Louis
Park

MN

Water














110,000


5

St.
Louis
Park

MN

Water

This
request
is
for
$9.2
million

to
construct
a
$20
million
grade
separated
intersec3on
at
Minnesota
State
 Highway
7
and
Wooddale
Avenue
in
St.
Louis
Park,
Minnesota.
 Bus
Shelter
Project
M‐XX12
‐
Shelter
Replacements.

Three
aging
bus
shelters
have
reached
their
life
 expectancy
and
need
to
be
replaced. Sanitary
Sewer
Project
‐
Mainline
Rehab:

This
work
consists
of
open
cut
replacement
or
trenchless
repair
of
 defec3ve
sanitary
sewer, Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trechnless
repair
of
sanitary
sewer.














170,000


5

St.
Louis
Park

MN

Water

Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trenchless
repair
of
sanitary
sewer














110,000


5

St.
Louis
Park

MN

Water

Sanitary
Sewer
Project
‐
Mainline
Rehab:
open
cut
replacement
or
trenchless
repair
of
sanitary
sewer.
















69,795


5

St.
Louis
Park

MN

Water

Sanitary
Sewer
Project
‐
open
cut
replacement
or
trenchless
repair
of
defec3ve
sanitary
sewer.














166,198


5

St.
Louis
Park

MN

Water














765,000


5

St.
Louis
Park

MN

Water














200,000


8

St.
Louis
Park

MN

Water














400,000


8

St.
Louis
Park

MN

Water














100,000


8

St.
Louis
Park

MN

Water














282,500


10

St.
Louis
Park

MN

Water














475,000


10

St.
Louis
Park

MN

Water














150,000


10

St.
Louis
Park

MN

Water














895,000


20

St.
Louis
Park

MN

Water












3,500,000


35

St.
Louis
Park

MN

Water

Watermain
Replacement.

This
work
involves
the
replacement
of
watermain,
hydrants,
and
valves
at
various
 loca3ons
in
area
5. Storm
Water
Project
‐
Annual
Catch
Basin
Repairs:
This
work
involves
the
construc3on
of
deteriorated
storm
 sewer
catch
basins
in
chipseal
areas
in
order
to
maintain
the
systems
to
a
serviceable
condi3ons. Storm
Water
Project
‐
Lib
Sta3on
6:
This
work
involves
the
rehabilita3on
or
replacement
of
Storm
Sewer
Lib
 Sta3on
#6
which
has
reached
its
life
expectancy. Water
Project
‐
Security
Improvements.

This
work
involves
the
installa3on
of
fencing
and
alarm
systems
at
the
 City's
water
treatment
facili3es. Sanitary
Sewer
Project
‐
Lib
Sta3on
17
and
Forecemain
Rehab.

This
works
consists
of
the
reconstruc3on
of
 sanitary
Lib
Sta3on
#17
and
rehabilita3on
of
the
adjacent
forcemain.

The
new
installa3on
will
be
a
 submersible
sta3on
which
will
re Sanitary
Sewer
Project
‐
Lib
Sta3on
3
and
Forcemain
Rehabilita3on.

This
work
consists
of
the
rehabilita3on
 (new
pumps
and
controls)
of
Lib
Sta3on
#3
and
forcemain Water
Treatment
Plan
Adjustable
Speed
Drive
(VFD)
Pump
Upgrades.

This
work
involves
adding
the
balance
of
 missing
adjustable
speed
drive
(VFD's)
to
the
high
service
pumps
at
city
Water
Treatment
Plants. Water
Treatment
Plant
#1
Filter
Rehabilita3on.

This
project
consists
of
the
removal
and
replacement
of
Water
 Treatment
Plan
filter
media,
filter
vessel
rehabilita3on,
the
addi3on
of
air
scour
equipment
and
chemical
feed.
 This Water
Treatment
Plan
#6
Granular
Ac3vated
Carbon
Upgrade.

This
project
consists
of
the
rehabilita3on
and
 expansion/upgrade
of
Water
Treatment
Plan
#
with
GAC
capability
to
remove
radium
and
PAH
contaminants
 from
the
groundwater Water
Project
‐
Replace/Upgrade
Residen3al
Meters.

This
project
consists
of
the
replacement
of
about
12,800
 residen3al
water
meters
which
are
over
15
years
old
in
conjunc3on
with
the
purchase
and
installa3on
of
radio
 read
equipment
and
sobware
for
a












3,500,000


40

City

State

Program

St.
Paul

MN

CDBG

St.
Paul

MN

CDBG

St.
Paul

MN

Streets/Roads

St.
Paul

MN

Streets/Roads

St.
Paul

MN

Streets/Roads

St.
Paul

MN

Transit

Staples

MN

Public
Safety

Staples

MN

Schools

Arlington
Library
and
Recrea3on
Center
(Miracle
Center)
Public
Private
Partnership
‐
Saint
Paul
is
looking
to
 bring
state
of
the
art
sustainability
to
reduce
opera3ng
costs
and
provide
green
learning,
and
in
doing
so,
 revitalize
a
neighborhood
 Cleveland
Circle
‐
$40
million
is
requested
to
fund
construc3on
of
Phase
I
expansion
of
the
Minnesota
Event
 District.*
Phase
I
expansion
includes
a
state
of
the
art,
community
ice
facility
of
excellence
which
will
 incorporate
youth
ac3vi3es Channel
Street
Stairs
(“The
Green
Stairs”)
Reconstruc3on
‐
The
proposed
Channel
Street
Stairs
project
 reconstructs
the
90
year
old,
90
foot
tall
steel
stairway
tower,
which
is
a
vital
pedestrian
link
between
the
 Prospect
Park
neighborhood,
Wabasha
Street Payne
Avenue
–
Edgerton
Street
to
Bush
Avenue
‐
Proposed
funding
would
allow
for
the
reconstruc3on
of
 roadway
including
traffic
calming
elements,
sidewalks
and
street
ligh3ng.

The
exis3ng
pavement
is
over
75
 years
old
and
is
badly
deteriorated.

 Western
Ave
–
Selby
to
University
‐
Reconstruct
roadway
including
bike
facili3es,
traffic
calming
elements,
and
 street
ligh3ng.
Public
Art
St.
Paul
and
the
affected
community
groups
have
completed
planning
on
the
project
 and
support
it.
 Central
Corridor
Light
Rail
Transit
(CCLRT)
‐
The
Central
Corridor
Development
Strategy,
an
element
of
the
Saint
 Paul
Comprehensive
Plan,
calls
for
the
construc3on
of
a
downtown‐scale
tower
above
and
around
the
transit
 line
on
the
block, Fiber
Op3c
Backbone.

Construc3on
of
fiber
backbone
throughout
community.

Collabora3ve
project
between
 City
of
Staples,
Central
Lakes
College,
School
District
and
Lakewood
Health
System. Upgrade
Outdated
Internet
and
Telecommunica3ons
Internal
Infrastructure
Backbone

Project
Descrip3on

Staples

MN

Schools

Replace
Single
Pane
Window
with
High
Efficient
Mul3
Pane
Windows

Staples

MN

Schools

Electric
Wind
Genera3on
a
School's

Agricultural
Farm,
Biomass
Boiler
at
High
School,
Solar
Power
Atop
Each
 Building

Staples

MN

Schools

Insulate
and
Repair
Leaking
Roofs
on
Each
of
School's
Buildings

Staples

MN

Streets/Roads

Staples

MN

Streets/Roads

Clayton

MO

Public
Safety

12th
Street
&
Wright
Avenue
Paving.

Paving
of
approximately
2,
050
feet
of
new
roadway
in
new
commercial
 development
area
along
US
10
in
Staples North/South
Corridor
with
Railroad
Overpass
Project.

Construc3on
of
approximately
8500
feet
of
roadway
and
 a
bridge
over
the
busy
BNSF
railroad
corridor.

Crossings
are
currently
blocked
3.5
to
5
hours
per
day,
crea3ng
 major
safety
concerns. Fire
Dept
Ladder
Truck

Clayton

MO

Public
Safety

Clayton

MO

Clayton

Funding
Required

Jobs












9,000,000


300










40,000,000


300












2,000,000


80












1,300,000


180












2,100,000


180










10,000,000


200














800,000


12














175,000


10














569,000


155












1,100,000


259












4,097,000


600














110,000


6












6,500,000


51












1,039,599


0

Signal
Pre‐Emp3on
Project
















20,000


5

Public
Safety

City
Hall
Security
System
















15,000


6

MO

Streets/Roads

Crack
Sealing














225,000


5

Clayton

MO

Streets/Roads

CBD
Streetscape
Sidewalk
Caulking
















36,300


6

Clayton

MO

Streets/Roads

Sidewalk
Repairs














150,000


6

Clayton

MO

Streets/Roads

Streetscape
Light
Pain3ng
















60,000


6

Clayton

MO

Streets/Roads

Wydown
Irriga3on














270,000


6

Clayton

MO

Streets/Roads

Curb
and
Gufer
Repairs
















90,000


8

Clayton

MO

Streets/Roads

Reloca3on
of
Electric
U3li3es
along
Gay
Ave

Clayton

MO

Streets/Roads

Clayton

MO

Clayton

MO

Clayton












1,500,000


8

Alley
Improvements














468,819


10

Streets/Roads

Microsurfacing














658,447


10

Streets/Roads

Turn
Lane
on
Maryland
Ave
&
Resignaliza3n
at
Gay
Ave














600,000


12

MO

Streets/Roads

Widening
Topton
Ave
&
Resignaliza3on
at
Maryland
Ave














450,000


12

Clayton

MO

Streets/Roads

Cecil
Ave
Reconstruc3on














154,600


14

Clayton

MO

Streets/Roads

Resurfacing
Davis
Place
Subd














455,785


14

Clayton

MO

Streets/Roads

Widening/Realignment
of
Gay
Ave












2,100,000


25

Clayton

MO

Water

Storm/Sanitary
Sewer
Reloca3on
along
Gay
Ave












1,200,000


8

Clayton

MO

Water

Oak
Knoll
Park
Stormwater
Project














360,000


14

Clayton

MO

Water

New
Stormwater
Deten3on
Structure
for
Brown
Shoe
Site














900,000


15

Columbia

MO

Airport

Locate
a
CFD
crash
truck
at
airport
to
augment
exis3ng
equipment












1,500,000


3

Columbia

MO

Airport

Addi3onal
Apron
Capacity












2,200,000


5

Columbia

MO

Airport

T‐Hangers
for
General
Avia3on












2,000,000


5

Columbia

MO

Airport

Crosswind
Runway
Rehabilita3on














171,414


6

Columbia

MO

Airport

Primary
Runway
Repairs














239,148


7

Columbia

MO

Airport

Taxiway
A
Repairs














382,191


8

Columbia

MO

Airport

Taxiway
B
Rehabilita3on














115,637


8

Columbia

MO

CDBG

Douglass
Park
Security
Camera
System














100,000


5

Columbia

MO

CDBG

Street
Reconstruc3on‐10
Miles
in
Old
Town












1,000,000


10

Columbia

MO

CDBG

Playground
equipment
replacement














650,000


15

Columbia

MO

Energy

Emergency
generator
retrofits
at
Sta3on
2
and
7














100,000


1

Columbia

MO

Energy

energy
projects
at
Fire
Sta3on
4,
5
and
6














300,000


2

Columbia

MO

Energy

Replace
2,738
Mercury/Vapor
Street
Lights
with
LED
Lights












3,753,798


2

Columbia

MO

Energy

Commercial
Energy
Efficiency‐Reduce
Building
Energy
Usage














500,000


3

Columbia

MO

Energy

Energy
Efficiency
Data
Base‐Track
Energy
Savings














500,000


3

Columbia

MO

Energy

Solar
Water
Tank
Mixers‐Water
Mixing
Unit












2,000,000


3

Columbia

MO

Energy

Low‐Income
Energy
Star
Homes














500,000


5

Columbia

MO

Energy

Solar
Energy
Development‐Increase
Use
of
Solar
Energy














400,000


7

Columbia

MO

Public
Safety

Armored
Vehicle‐Rescue
Use
and
Homeland
Security














300,000


0

Columbia

MO

Public
Safety

Hazardous
Device
Unit
(bomb
squad)
equipment














100,000


0

Columbia

MO

Public
Safety

Two
(2)
Police
Cruisers
















80,000


0

Columbia

MO

Public
Safety

Four
(4)
Police
Officers














250,000


4

Columbia

MO

Public
Safety

Modernize
Fire
Sta3ons
4‐6












1,600,000


18

City

State

Program

Columbia

MO

Streets/Roads

Street;

Intersec3on
&
Sidewalk
Reconstruc3on

Project
Descrip3on

Funding
Required Jobs 








35,000,000
 10

Columbia

MO

Streets/Roads

Discovery
Parkway
(Hwy.
63‐Rolling
Hills
Road)












4,000,000


20

Columbia

MO

Streets/Roads

Construct
Railroad
Overpass‐Hwy.
63
Safety
Problem;

state,
county,
city












9,000,000


25

Columbia

MO

Transit

Bus
Replacement
Nine
(9)












3,000,000


20

Columbia

MO

Water

Chlorammona3on
Equipment‐3
Systems












1,200,000


0

Columbia

MO

Water

Chlorine
Analyzers‐Measures
Chlorine
Levels
















40,000


0

Columbia

MO

Water

VFD‐Speed
Equipment












1,500,000


0

Columbia

MO

Water

Gas
Chlorina3on
System
Conversion












1,500,000


3

Columbia

MO

Water

Mezzanine
Level
Catwalk‐Water
Plant
and
West
Ash
Pumping
Sta3ons














300,000


3

Columbia

MO

Water

Sludge
Storage
Area














750,000


3

Columbia

MO

Water

Emergency
Backup
Diesel
Generators












1,500,000


5

Columbia

MO

Water

Emergency
Backup
Diesel
Generators












1,500,000


5

Columbia

MO

Water

Aerators‐Water
Treatment
Equipment














600,000


6

Columbia

MO

Water

ASR
Conversion
of
Exis3ng
Deep
Well














475,000


6

Columbia

MO

Water

Drilling
Alluvial
Wells‐add'l
supply
wells












1,500,000


6

Columbia

MO

Water

Gans
Creek
Pump
Sta3on












2,100,000


7

Columbia

MO

Water

Midway
Sewer
Extension












1,600,000


7

Columbia

MO

Water

North
Grindstone
Extension
Route
Z‐Industrial
Park
(sewer)












1,300,000


7

Columbia

MO

Water

Upper
Hinkson
Creek
Ouzall
Extension
Phase
2












3,000,000


7

Columbia

MO

Water

Business
Loop
70‐Phase
5‐3,800'
Main
Replacement












1,045,000


12

Columbia

MO

Water

Concrete
Floor
in
Water
Treatment
Lagoons












3,000,000


14

Ellisville

MO

Streets/Roads














520,000


10

Ellisville

MO

Streets/Roads














600,000


12

Ellisville

MO

Streets/Roads














390,250


15

Ellisville

MO

Streets/Roads














782,500


15

Ellisville

MO

Streets/Roads












1,450,000


50

Florissant

MO

CDBG

Hilltop
Road
requires
new
concrete
curb
and
gufer,
complete
asphalt
street
removal
and
replacement
and
 new
storm
sewer
systems.

U3lity
reloca3ons
will
be
required
to
accommodate
the
road
improvements.


 Fairview
Lane
requires
complete
removal
and
replacement
with
the
associated
storm
sewer
improvements.

 Potholes
and
storm
water
backs
are
frequent
as
a
result
of
aging
infrastructure.
 Complete
street
replacement
and
storm
water
improvements
for
Debula
Dr.
The
aging
infrastructure
has
 created
public
nuisances
such
as
standing
water,
water
back‐ups
and
cracked
pavement. Complete
street
replacement
and
storm
water
improvements
for
Vero
Lane.

The
storm
water
sewers
are
 failing,
crea3ng
pavement
seflement
and
cracking. The
proposed
project
addresses
the
concrete
street
deficiencies
throughout
the
City
of
Ellisville
street
network
 ranging
from
total
removal
and
replacement
of
the
street
segments
to
spot
slab
removal
and
replacement.

 The
majority
of
the
pavement
failure
 Ice
Rink
Enclosure
at
the
Florissant
Eagan
Civic
Center.














500,000


25

Florissant

MO

CDBG

Paddock
Creek
Bank
Stabiliza3on
Project.












2,250,000


50

Florissant

MO

CDBG

Construc3on
of
a
new
municipal
Golf
Course
Maintenance
Building.












1,100,000


60

Florissant

MO

CDBG

Boy/Girl
Scout
Camping
Area
and
Amphitheater
in
Sunset
Park.












2,100,000


65

Florissant

MO

CDBG

Lindbergh
Boulevard/North
Highway
67
Cooridor
Enhancement
Project
Phase
III












2,250,000


75

Florissant

MO

CDBG

Construc3on
of
a
new
Health
Department
Building
and
Kennel
for
the
City
of
Florissant.












1,500,000


100

Florissant

MO

CDBG

Construc3on
of
a
new
Senior
Center
for
the
City
of
Florissant.












1,300,000


110

Florissant

MO

CDBG

Expansion
of
the
Lake
at
St.
Ferdinand
Park
with
renova3ons
to
the
Bockrath
Weise
House
(Historic
Site).












3,700,000


115

Florissant

MO

CDBG

Construc3on
of
a
new
Park
Maintenance
Facility
for
the
City
of
Florissant.












2,000,000


120

Florissant

MO

CDBG












9,400,000


200

Florissant

MO

CDBG

Sunset
Park
Marina
on
the
Missouri
River
(Roadway,
Parking
Lot,
Boat
Ramp,
Docks,
Fueling
Sta3on,
Store,
 Boat
Slips,
Rock
Jefy,
and
all
Applicable
U3li3es). Construc3on
of
a
new
Cable
TV
and
IT
Building.










15,000,000


250

Florissant

MO

CDBG

Mainstreet
Florissant
Old
Town
Redevelopment.










15,000,000


500

Florissant

MO

CDBG

Old
Town
Florissant
Street
&
Storm
Water
Drainage
Improvement
Projects
(Phases
8
through
40).










30,000,000


2000

Florissant

MO

CDBG










35,000,000


2200

Florissant

MO

CDBG










40,000,000


3000

Florissant

MO

Energy

Construc3on
of
a
new
Music
Hall
of
Fame
Building
in
Historic
Old
Town
Florissant.

This
building
would
be
a
 joint
venture
between
the
University
of
Missouri
at
St.
Louis
and
the
City
of
Florissant. Construc3on
of
a
new
Municipal
Court
Building
with
addi3onal
use
for
various
Boards
&
Commissions
 Mee3ngs. Golf
Course
Water
Reclama3on
Project.












1,100,000


35

Florissant

MO

Public
Safety

Security
of
Public
Buildings
to
Include
Access
Control,
Bollards
and
Alarms.














100,000


3

Florissant

MO

Public
Safety

Surveillance
Video
Network
to
Monitor
High
Crime
Areas
within
the
City
of
Florissant.














400,000


5

Florissant

MO

Public
Safety

Development
of
a
Crime
Interdic3on
Unit
to
reduce
Violent
Crimes.














450,000


6

Jefferson
City

MO

Airport

replace
ATCT












3,000,000


30

Jefferson
City

MO

CDBG

curb
&
gufer
repair
‐
Old
Town












1,000,000


10

Jefferson
City

MO

CDBG

sidewalk
repair
‐
Old
Town












1,000,000


10

Jefferson
City

MO

CDBG

street
overlay
‐
10
miles
in
Old
Town












1,000,000


10

Jefferson
City

MO

CDBG

storm
water
improvement
‐
Old
Town












5,000,000


50

Jefferson
City

MO

CDBG

street
reconstruc3on
‐
2
miles
in
Old
Town












5,000,000


50

Jefferson
City

MO

Housing

Dulle
Towers
mechanical
systems












1,500,000


15

Jefferson
City

MO

Housing

35
unit
public
housing
moderniza3on












2,000,000


20

Jefferson
City

MO

Public
Safety

Communica3ons
center
upgrade,
reverse
911
&
equipment














200,000


2

Jefferson
City

MO

Public
Safety

Building
security,
HVAC,
locker
room
renova3on,
entry
and
booking
area
renova3on














300,000


3

Jefferson
City

MO

Public
Safety

Equipment
for
SWAT,
Accident
inves3ga3ons,
detec3ves,
patrol














300,000


3

Jefferson
City

MO

Public
Safety

Outdoor
warning
sirens












1,000,000


10

Jefferson
City

MO

Public
Safety

Replace
Animal
Shelter












1,500,000


15

Jefferson
City

MO

Streets/Roads

Lafayefe
at
Stadium
intersec3on
improvements














300,000


3

Jefferson
City

MO

Streets/Roads

Stadium
at
Southwest
Blvd
signal
and
lane
addi3on














300,000


3

Jefferson
City

MO

Streets/Roads

Tanner
Bridge
at
Ellis
intersec3on
improvements














500,000


5

Jefferson
City

MO

Streets/Roads

TE
nonmotorized‐
greenway














600,000


6

Jefferson
City

MO

Streets/Roads

Jefferson
St
Ramp
improvements












1,000,000


10

City

State

Program

Jefferson
City

MO

Streets/Roads

E
McCarty
improvements

Project
Descrip3on

Jefferson
City

MO

Streets/Roads

TE
nonmotorized‐Mo
River
ped
bridge












6,000,000


60

Jefferson
City

MO

Streets/Roads

SMHC
street,
stormwater,
sanitary‐east
&
west










12,000,000


120

Jefferson
City

MO

Transit

Facility
&
cm
improvements,
emergency
generator












1,000,000


10

Jefferson
City

MO

Transit

Replace
buses/2009
replacement
schedule
&
equipment












2,000,000


20

Jefferson
City

MO

Water

Basin
10
‐
St
Marys
&
Hwy
179
relief
sewer












1,000,000


10

Jefferson
City

MO

Water

Frog
Hollow
and
Rock
Ridge
sanitary
sewer
extensions












1,000,000


10

Jefferson
City

MO

Water

Hayselton
pump
sta3on












1,000,000


10

Jefferson
City

MO

Water

Longview
and
Moreauview
sanitary
sewer
extensions












1,000,000


10

Jefferson
City

MO

Water

Rickman‐Christy‐Tanner
sanitary
sewer
extension












1,000,000


10

Jefferson
City

MO

Water

Mili3a‐Taos
sanitary
sewer
interconnect












1,500,000


15

Jefferson
City

MO

Water

Algoa
area
and
industrial
park
collec3on
and
treatment












8,000,000


80

Kansas
City

MO

Airport












3,000,000


36

Kansas
City

MO

Airport












3,000,000


36

Kansas
City

MO

Airport

Downtown
Airport
Relief
Well
and
Airfield
Dewatering
System
Rehabilita3on
‐
Replacement
of
relief
wells
as
 required
to
maintain
the
integrity
of
permanent
airport
dewatering
system Flight
Informa3on
Displays
–
Install
new
technology
large
scale
informa3onal
displays
on
public
airport
 approach
roadways KCI
Land
Acquisi3on
‐
Acquire
noise
impacted
land
as
indicated
in
latest
CFR
14
Part
150
Update












4,000,000


48

Kansas
City

MO

Airport












5,000,000


60

Kansas
City

MO

Airport












6,000,000


72

Kansas
City

MO

Airport












7,000,000


84

Kansas
City

MO

Airport












7,000,000


84

Kansas
City

MO

Airport










12,000,000


144

Kansas
City

MO

Airport










18,000,000


216

Kansas
City

MO

CDBG

Airfield
Snow
Removal
Equip.
&
ARFF
Apparatus
Maintenance
Facility
Addi3ons
‐
Expand
and
renovate
Fleet
 Maintenance
Facility
in
order
to
facilitate
repair
and
maintenance
of
large
equipment
needed
for
snow
 removal
opera3ons
on
the
pavements
used
by
comm Field
Maintenance
Facility
–

Rehabilitate
field
maintenance
facility
to
accommodate
increase
in
number
of
 personnel Airfield
Pavement
Repairs
–
RW
1R/19L
&
RW
9/27‐Pavement
rehabilita3ons
to
extend
service
life
of
airfield
 pavements Chilled
Water
System
Rehabilita3on
–

Replace
cooling
towers
and
underground
chilled
water
distribu3on
 piping
for
the
three
passenger
terminal
buildings
at
KCI Runway
Safety
Area
Improvements
–
Relocate
thresholds
and
install
EMAS
at
the
Charles
B.
Wheeler
 Downtown
Airport Terminal
Access
Roadway
Rehabilita3on
‐
Pavement
rehabilita3on
and
moderniza3on
of
the
public
access
 roads
of
each
of
the
three
passenger
terminal
facili3es
–
including
ADA
access
and
bus
shelters
for
ground
 transporta3on
passengers Indian
Creek
Trail
‐
On
the
south
side
of
Indian
Creek
from
Lydia
to
the
Union
Pacific
Railroad
Tracks














350,000


5

Kansas
City

MO

CDBG

Blue
River
Athle3c
Field
Trail
at
103rd
and
I‐435
‐
Connects
Blue
River
Trail
to
Alex
George
Lake
Trail 












450,000


6

Kansas
City

MO

CDBG

Town
of
Kansas
Historical
Site
‐
For
construc3on
of
interpre3ve
fencing
around
the
historical
site














650,000


7

Kansas
City

MO

CDBG

Sni‐A‐Bar
Bridge
–
Bridge
Replacement














700,000


8

Kansas
City

MO

CDBG

Black
Archives
‐
Comple3on
of
Renova3ons
for
Black
Archives
18th
and
Vine
Area

Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City Kansas
City

MO MO MO MO MO MO

CDBG CDBG CDBG CDBG CDBG CDBG

Columbus
Park
‐
To
construct
infrastructure
for
urban
redevelopment
project East
Village
Infrastructure
–
For
pubic
infrastructure
for
urban
redevelopment
program Line
Creek/2nd
Creek
Trail
‐
For
construc3on
of
shared‐use
trail
in
Line
Creek
Valley Tiffany
Springs
Road
‐
For
extending
Tiffany
Springs
Road
from
Tiffany
Hills
Sports
Park
to
Amity
Road Red
Bridge
Road
Streetscape
–
For
streetscape
improvements Van
Brundt
Trail
‐
For
construc3on
of
shared‐use
trail
to
connect
Brush
Creek
Trail
to
Linwood
Blvd














750,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,100,000


9 12 12 12 12 13












1,200,000


14

Kansas
City

MO

CDBG












1,300,000


15

Kansas
City

MO

CDBG

Maplewoods
Parkway
–
1‐52
to
Barry
Road
‐
For
acquisi3on
and
construc3on
of
widening
to
4‐lane
parkway
 and
shared‐use
trail
 Hampton
Road
Bridge
–
Bridge
replacement












1,500,000


18

Kansas
City

MO

CDBG

Street
Tree
Plan3ng
‐
For
plan3ng
13,000
trees
in
City
right‐of‐ways
as
a
climate
protec3on
measure












1,500,000


18

Kansas
City

MO

CDBG

Congress
/
Prairie
View
Interchange
–
For
improving
intersec3on












1,600,000


19

Kansas
City

MO

CDBG

St.
John
Avenue
–
To
construct
streetscape
improvements












1,600,000


19

Kansas
City

MO

CDBG

Tiffany
Springs
Trails
‐
From
Tiffany
Springs
Parkway
to
Green
Hills
Road












1,600,000


19

Kansas
City

MO

CDBG

Vivion
Trail
Phase
3
–
For
construc3on
of
shared‐use
trail
to
connect
exis3ng
trail
to
An3och
shopping
center












1,800,000


20

Kansas
City

MO

CDBG

Precast
Culvert
in
Street
District
1
lot
‐
For
placing
a
long
concrete
culvert
in
the
ditch
that
separates
the
lot












2,000,000


24

Kansas
City

MO

CDBG

Shoal
Creek
Parkway
‐
N.Woodland
to
Staley
High‐school‐
For
construc3on
of
parkway












2,200,000


25

Kansas
City

MO

CDBG

Trolley
Track
Trail
‐
Connect
Indian
Creek
Greenway
Trail
to
Trolley
Track
Trail














2,400,000


28

Kansas
City

MO

CDBG

Barry
Road
‐
For
extending
Barry
Road
from
Boardwalk
to
Ambassador
Drive













2,500,000


30

Kansas
City

MO

CDBG












2,600,000


31

Kansas
City

MO

CDBG

96th
Street
and
Reinking
Bridge
‐
For
replacement
of
two
bridges
at
the
intersec3on
of
Reinking
and
96th
 Street Beacon
Hill
–
To
construct
infrastructure
for
urban
redevelopment
project












2,615,000


31

Kansas
City

MO

CDBG

135th
Street
Streetscape
–
To
construct
sidewalks
and
enhance
pedestrian
environment

Kansas
City Kansas
City Kansas
City

MO MO MO

CDBG CDBG CDBG

33 36 39












3,500,000


42

Kansas
City

MO

CDBG












3,500,000


42

Kansas
City

MO

CDBG

Hickman
Mills
Housing
Demonstra3on
Project
–
En3re
block
housing
rehabilita3on
to
demonstrate
the
impact
 Ambassador
Road
from
Tiffany
Springs
Road
to
Tiffany
Springs
Parkway 18th
and
Vine
Historic
District
‐
Rehabilita3on
of
Historic
Buildings
for
Economic
Development
in
Urban
Core
‐
 Designed,
can
proceed
immediately 22nd/23rd
Street,
Sec3on
1B
‐
Improvements
and
capacity
upgrades
on
22nd
Street
from
Bruce
R
Watkins
 (US71)
to
Brooklyn
Ave. Tiffany
Springs
Road
‐
For
extending
Tiffany
Springs
Road
from
Green
Hills
to
Hull
Avenue












2,800,000
 










3,000,000
 










5,350,000













3,700,000


45

Kansas
City

MO

CDBG

Downtown
Streetscape
–
To
construct
streetscape
improvements












4,000,000


48

Kansas
City

MO

CDBG












4,200,000


50

Kansas
City

MO

CDBG












5,000,000


60

Kansas
City

MO

CDBG

18th
and
Vine
Museum
Facility
Improvements
‐
Expansion/Renova3on
of
Economic
Development
Project
in
 Urban
Core 87th
Street,
Phase
2
‐

Improvements
and
capacity
upgrades
on
87th
Street
from
Denver
Avenue
through
the
I‐ 435
Interchange Sidewalk
Projects
–
For
urban
core
sidewalk
repair
and
construc3on












5,000,000


60

Kansas
City

MO

CDBG












5,000,000


60

Traffic
Control
Center
–
For
crea3on
of
a
central
command
center
to
control
traffic
flow
and
increase
 efficiencies

Funding
Required 










5,000,000


Jobs 50

City

State

Program

Kansas
City

MO

CDBG

Traffic
Signal
Interconnect
‐
For
interconnect
program

Project
Descrip3on

Funding
Required 










5,000,000


Jobs 60

Kansas
City

MO

CDBG

Kansas
City

MO

CDBG

Kansas
City

MO

CDBG

Waukomis
and
72nd
Street
–
For
extending
72nd
Street
to
Waukomis
and
then
improving
Waukomis
to
reduce
 accidents Westport
Triangle
‐
For
modifica3on
of
streets
and
signals
with
interconnec3on
of
the
Westport
Triangle
and
 improved
pedestrian
safety Skyview
Avenue
–
For
extending
Skyview
from
Tiffany
Springs
Parkway
to
Tiffany
Springs
Road













5,000,000


60












5,000,000


60












5,460,000


Kansas
City

MO

CDBG

66

City
Market
Improvements
‐Renova3on/Renova3on
of
Public
Market
Buildings












5,700,000


Kansas
City

MO

68

CDBG

Street
Tree
Trimming
‐
For
tree
maintenance
of
exis3ng
forest
infrastructure












6,000,000


Kansas
City

72

MO

CDBG

18th
Street
Connector
‐
Roadway
improvements
linking
Urban
Core
Centers












6,100,000


73

Kansas
City

MO

CDBG

Streetlight
Tree
Trimming
‐
For
tree
trimming
surrounding
streetlights












7,500,000


90

Kansas
City

MO

CDBG

City
Hall
Building
Improvements
‐
To
construct
improvements












8,000,000


96

Kansas
City

MO

CDBG

Shoal
Creek
Parkway
‐
N.96th
@
N.Eastern
Ave.to
N.
Brighton
Ave
‐
For
construc3on
of
parkway












8,000,000


96

Kansas
City

MO

CDBG

Council
District
6
Aqua3c
Center
‐
For
construc3on
of
Aqua3c
Center












9,000,000


108

Kansas
City

MO

CDBG

North
Oak
Corridor
Streetscape
–
To
construct
streetscape
improvements












9,300,000


111

Kansas
City

MO

CDBG

Playground
Replacements
‐
For
playground
replacements
in
parks
citywide












9,800,000


117

Kansas
City

MO

CDBG

Bridge
Rehabilita3on
‐
For
bridge
repair/rehabilita3on
citywide










10,000,000


120

Kansas
City

MO

CDBG

Main
Street
Streetscape
–
For
streetscape
improvements
from
30th
Street
to
44th
Street










10,000,000


120

Kansas
City

MO

CDBG

Municipal
Buildings
‐
For
municipal
building
rehabilita3on,
including
roof
repair,
HVAC,
etc.

Kansas
City Kansas
City

MO MO

CDBG CDBG

Tiffany
Springs
Parkway
‐
For
extending
Tiffany
Springs
Parkway
from
Green
Hills
Road
to
course
entrance Gower
at
64th
Street
‐
Street
and
Bridge
Improvements










10,000,000
 








10,150,000


120 121










10,200,000


122

Kansas
City

MO

CDBG










10,300,000


123

Kansas
City

MO

CDBG

Central
Region
Maintenance
Facility‐39th
and
Gillham
‐
For
construc3on
of
maintenance
facility
for
Park’s
 Central
Region Green
Hills
Road
‐
For
extending
Green
Hills
Road
from
152
Highway
to
Tiffany
Springs
Parkway










10,740,000


129

Kansas
City

MO

CDBG

N.
Brighton
–
Vivion
to
58th
Street
‐For
widening
of
N.
Brighton
from
two
to
four
lanes










11,600,000


139

Kansas
City

MO

CDBG

Troost
Bridge
and
Volker
Intersec3on
‐
Bridge
replacement
and
intersec3on
improvements










12,000,000


144

Kansas
City

MO

CDBG

Chouteau
Parkway
–
Parvin
Road
to
210
Highway
‐
For
construc3on
of
parkway.










13,000,000


156

Kansas
City

MO

CDBG

Northeast
Community
Center
‐
9th
and
Van
Brunt
‐
For
construc3on
of
Community
Center










14,000,000


168

Kansas
City

MO

CDBG

Shoal
Creek
Parkway
‐
N.96th
to
N.
Woodland
‐
For
construc3on
of
parkway










14,800,000


177

Kansas
City

MO

CDBG

KCI
Intermodal
BusinessCentre
Phase
II
–
Grading,
u3li3es
and
streets
for
industrial
warehousing
park










15,000,000


180

Kansas
City

MO

CDBG










16,000,000


192

Kansas
City

MO

CDBG

Central
U3lity
Plant
Improvements
–
To
replace
chillers
and
boilers
to
support
Aircrab
Overhaul
Base
 infrastructure Street
Resurfacing
‐
For
street
resurfacing
citywide








100,000,000


1200

Kansas
City

MO

Energy

Park
Administra3on
Building
‐
Energy
upgrades
to
ligh3ng
and
HVAC












1,000,000


12

Kansas
City

MO

Energy












1,300,000


15

Kansas
City

MO

Energy

11th
and
Oak
Garage
Ligh3ng
‐
For
providing
new
energy
efficient
ligh3ng
and
ligh3ng
control
system
for
 parking
garage Municipal
Auditorium
Exterior
Preserva3on
‐
For
cleaning,
repairing,
and
tuck
poin3ng
exterior
of
the
building












3,800,000


45

Kansas
City

MO

Public
Safety












6,000,000


72

Kansas
City

MO

Streets/Roads

New
Police
Department
Helicopter
‐
For
purchasing
a
new
police
helicopter
to
replace
one
of
their
40‐year
old
 copters W.
Front
Street
at
new
I‐29/35
Interchange
–
For
construc3on
of
roadway












3,900,000


46

Kansas
City

MO

Streets/Roads

Barry
Road
and
I‐29
Phase
2
–
For
increased
traffic
efficiency












5,000,000


60

Kansas
City

MO

Streets/Roads

Briarcliff
Parkway–
For
new
diamond
interchange
at
Highway
9












5,000,000


60

Kansas
City

MO

Streets/Roads

Lou
Holland
Drive
and
Richards
Road
–
For
street
rehabilita3on












5,000,000


60

Kansas
City

MO

Streets/Roads

Red
Bridge
Road
‐
Holmes
to
Blue
River
Road
‐
For
construc3on
of
roadway
and
bridge












5,000,000


60

Kansas
City

MO

Streets/Roads

Forrester
Bridge
–
Bridge
replacement
into
the
West
Bofom/Central
Industrial
District
area












5,700,000


68

Kansas
City

MO

Streets/Roads

Cookingham
Drive
and
Interna3onal
Circle
–
Four
lane
divided
highway
rehabilita3on












6,000,000


72

Kansas
City

MO

Streets/Roads

12th
Street
Viaduct
upper
deck
and
middle
deck–
For
resurfacing
this
bridge’s
middle
deck












9,300,000


111

Kansas
City

MO

Streets/Roads










10,000,000


120

Kansas
City

MO

Streets/Roads










11,000,000


121

Kansas
City

MO

Streets/Roads

Tiffany
Springs
Parkway
Extension
‐For
an
extension
of
exis3ng
four‐lane
divided
parkway
to
the
west
of
 Interstate
Highway
29 Traffic
Signal
Interconnect
‐
For
crea3on
of
an
interconnect
system
to
create
traffic
flow
improvements
and
 efficiencies NE
108th
and
I‐169
Interchange
‐
For
construc3on
of
Interchange










10,250,000


123

Kansas
City

MO

Streets/Roads

NE
96th
and
I‐169
Interchange
‐
For
construc3on
of
Interchange










10,250,000


123

Kansas
City

MO

Streets/Roads










13,400,000


160

Kansas
City

MO

Streets/Roads










18,000,000


216

Kansas
City

MO

Water










10,000,000


120

Kansas
City

MO

Water

Barry
Road,
Sec3on
2
–
Barry
Road
from
Conant
to
Potomac
and
Amity
Road
from
Barry
Road
to
M152
‐
 Improvements
and
capacity
upgrades
to
Barry
Road
and
Amity
Road
as
well
as
replacing
the
Rush
Creek
Bridge
 used
by
the
residents
of
KCMO
and
Weatherby
Lake Traffic
Signal
Projects
‐
For
crea3on
of
25
signal
improvements
and
construc3on
to
increase
traffic
efficiency
 construc3on 150
Highway
&
Bofs
Road
‐
For
increasing
capacity
and
efficiency
for
the
NNSA/Honeywell
loca3on
in
south
 Kansas
City Water
Facility
Projects
–
For
four
facility
improvement
projects










10,500,000


126

Kansas
City

MO

Water










10,750,000


129

Kansas
City

MO

Water

Water
Main
Replacements
–
For
construc3on
of
five
small
water
main
replacement
projects
for
increased
 water
delivery
and
efficiency Troost
at
Brush
Creek
transporta3on
project
‐
For
increasing
efficiency
near
the
Brush
Creek
Channel
project










12,000,000


144

Kansas
City

MO

Water

Wastewater
Facility
Projects
‐
For
the
Turkey
Creek
Pump
Sta3on
and
White
aloe
Pump
Sta3on
rehab










12,300,000


147

Kansas
City

MO

Water










18,000,000


216

Kansas
City

MO

Water










38,700,000


464

Kansas
City

MO

Water

Combined
Sewer
Separa3on
–
To
separate
combined
wastewater
and
stormwater
collec3on
system
at
the
 Charles
B.
Wheeler
Downtown
Airport Water
Stormwater
Projects
‐
For
improvements
to
Chouteau
and
Gardner
in
the
Industrial
Northeast
and
 Central
Industrial
District
and
Troost/Paseo/Brush
Creek
Channel
storm
water
infrastructure Sanitary
Sewer
Projects
City‐Wide
‐For
eight
sanitary
sewer
projects
throughout
Kansas
City










67,500,000


810

Pine
Lawn

MO

CDBG

Construc3on
of
a
new
Public
Works
Maintenance
Building
for
the
City
of
Pine
Lawn












5,000,000


10

Pine
Lawn

MO

CDBG

Installa3on
of
new
sidewalks
throughout
the
Cityof
Pine
Lawn












2,500,000


20

Pine
Lawn

MO

CDBG

Construc3on
of
a
new
Community
Center
that
will
have
programs
for
the
elderly
and
youth










23,000,000


32

City

State

Program

Pine
Lawn

MO

CDBG

Pine
Lawn

MO

CDBG

Construc3on
of
a
new
Government
Building
to
include
an
Emergency
Opera3ng
Center
for
the
City
of
Pine
 Lawn Mainstreet
Pine
Lawn
Development
for
the
City
of
Pine
Lawn

Project
Descrip3on

Pine
Lawn

MO

Public
Safety

Purchase
5
addi3onal
Police
Cars
for
addi3onal
staff

Pine
Lawn

MO

Public
Safety

Purchase
cameras
and
suppor3ng
recording
equipment
for
the
Police
Cars
and
Holding
Jail
area.

Pine
Lawn

MO

Public
Safety

St.
Louis

MO

St.
Louis

MO

St.
Louis

Funding
Required

Jobs










45,000,000


75










78,000,000


200














200,000


2












2,300,000


7

Hire
addi3onal
Police
and
suppor3ng
staff
to
patrol
the
city
streets
and
police
presence
at
the
schools.














750,000


10

Airport

Noise
Monitoring
System
Upgrade














500,000


25

Airport

Resurfacing
Taxiway
L
from
TWY
F7
to
TWY
F














375,000


25

MO

Airport

Environmental
Management
System












1,500,000


45

St.
Louis

MO

Airport

North
Apron
Reconstruc3on












5,200,000


157

St.
Louis

MO

Airport

Taxiway
E
Reconstruc3on‐‐Part
2












6,700,000


202

St.
Louis

MO

Airport

Taxiway
V
Reconstruc3on‐‐Part
2












8,500,000


257

St.
Louis

MO

Airport

Taxiway
D
Reconstruc3on












8,800,000


266

St.
Louis

MO

Airport

Taxiway
E
Reconstruc3on‐‐Part
3












9,000,000


272

St.
Louis

MO

Airport

Taxiway
E
Reconstruc3on‐‐Part
1












9,200,000


278

St.
Louis

MO

Airport

Taxiway
V
Reconstruc3on‐‐Part
1












9,700,000


293

St.
Louis

MO

Airport

Runway
Centerline
Panel
Replacement










10,000,000


302

St.
Louis

MO

Airport

Taxiway
S
Reconstruc3on










11,200,000


338

St.
Louis

MO

CDBG

Build
a
911
communica3on
center
with
radio
frequency
tower












1,500,000


50

St.
Louis

MO

CDBG

Carver
School
Moderniza3on












1,000,000


30

St.
Louis

MO

CDBG

Habitat
for
Humanity
Streetscape
Improvements












1,000,000


30

St.
Louis

MO

CDBG

Habitat
for
Neighborhood
Business
Infrastructure/Energy
Enhancements












1,000,000


30

St.
Louis

MO

CDBG

Handy
Park
Improvements












1,000,000


30

St.
Louis

MO

CDBG

Park/Street
Enhancements
at
New
Animal
Care
Facility












1,000,000


30

St.
Louis

MO

CDBG

North
Market
Place/Old
North
St.
Louis
Streetscape
Improvements












1,300,000


39

St.
Louis

MO

CDBG

Grand
Center
Infrastructure/Safety
Improvements












1,500,000


45

St.
Louis

MO

CDBG

Forest
Park
"Heels
&
Wheels"
Trail












1,800,000


54

St.
Louis

MO

CDBG

Grandel
Theater
Moderniza3on












1,950,000


59

St.
Louis

MO

CDBG

CORTEX
Life
Sciences
Business
Park
Site
Prepara3on












2,000,000


60

St.
Louis

MO

CDBG

Delmar
Streetscape
Improvements‐‐Hodiamont
to
Goodfellow












2,000,000


60

St.
Louis

MO

CDBG

Manchester
Pedestrian
Ligh3ng‐‐Kingshighway
to
Vandeventer












2,000,000


60

St.
Louis

MO

CDBG

New
Park
Development












2,000,000


60

St.
Louis

MO

CDBG

River
Des
Peres
Greenway
Extension‐‐Part
1












2,000,000


60

St.
Louis

MO

CDBG

River
Des
Peres
Greenway
Extension‐‐Part
2












2,000,000


60

St.
Louis

MO

CDBG

Adelaide
Business
Campus
stormwater
and
drainage












2,000,000


60.4

St.
Louis

MO

CDBG

Hall
Street
Improvements












2,000,000


60.4

St.
Louis

MO

CDBG

Forest
Park
Urban
Golf
Course
Renova3on












2,100,000


63

St.
Louis

MO

CDBG

Grand
Center
Adap3ve
Church
Reuse‐‐Park/Exhibi3on
Space












2,250,000


68

St.
Louis

MO

CDBG

Lafayefe
Square
Pedestrian
Ligh3ng












2,500,000


76

St.
Louis

MO

CDBG

West
Florissant
Streetscape
Improvements‐‐I‐70
to
Adelaide












2,500,000


76

St.
Louis

MO

CDBG

Macklind
Streetscape
Improvements‐‐Chippewa
to
Eichelberger












3,000,000


90

St.
Louis

MO

CDBG

North
Kingshighway
Streetscape
Improvements‐‐Delmar
to
Dr.
MLK












3,000,000


90

St.
Louis

MO

CDBG

Carrie
Avenue/Northside
Business
Park
Streetscape/Infrastructure












3,000,000


91

St.
Louis

MO

CDBG

City
Hall
Historic
Renova3on‐‐Exterior
Cleaning












3,000,000


91

St.
Louis

MO

CDBG

Dick
Gregory
Place
Infrastructure












3,000,000


91

St.
Louis

MO

CDBG

Grand
Center
Performance
Green












3,000,000


91

St.
Louis

MO

CDBG

I‐70/Goodfellow
Streetscape
Improvements












3,000,000


91

St.
Louis

MO

CDBG

Meramec
Avenue
Streetscape
Improvements‐‐Grand
to
S.
Broadway












3,000,000


91

St.
Louis

MO

CDBG

North
Grand
Avenue
Streetscape
Improvements‐‐Delmar
to
Dr.
MLK












3,000,000


91

St.
Louis

MO

CDBG

North
Grand
Avenue
Streetscape
Improvements‐‐Water
Tower
District












3,000,000


91

St.
Louis

MO

CDBG

Forest
Park
Bridge/Muny
Tributary
Replacement












3,300,000


100

St.
Louis

MO

CDBG

Hyde
Park
Renova3on
Plan
Implementa3on












3,700,000


112

St.
Louis

MO

CDBG

City
Hall
Historic
Renova3on‐‐Exterior
Repairs/Roofing/Ligh3ng












4,000,000


120

St.
Louis

MO

CDBG

Dr.
Mar3n
Luther
King
Pedestrian
Ligh3ng‐‐Grand
to
Kinghsighway












4,000,000


120

St.
Louis

MO

CDBG

Morganford
Streetscape
Improvements‐‐Arsenal
to
Chippewa












4,000,000


120

St.
Louis

MO

CDBG

South
Grand
Streetscape
Improvements‐‐Arsenal
to
Gravois












4,000,000


120

St.
Louis

MO

CDBG

West
Florissant
Streetscape
Improvements‐‐Riverview
to
I‐70












4,000,000


120

St.
Louis

MO

CDBG

Mallinckrodt
Streetscape
Improvements












4,000,000


121

St.
Louis

MO

CDBG

Sarah
Avenue
Streetscape
Improvements‐‐Vandeventer
to
Lindell












4,000,000


121

St.
Louis

MO

CDBG

Locust
Streetscape
Improvements‐‐Tucker
to
Jefferson












5,000,000


133

St.
Louis

MO

CDBG

Euclid
Avenue
Streetscape
Improvements‐‐Forest
Park
Parkway
to
Lindell












4,500,000


136

St.
Louis

MO

CDBG

Chippewa
Streetscape‐‐Grand
to
South
Broadway












5,000,000


151

St.
Louis

MO

CDBG

City
Hall
Historic
Renova3on‐‐Interior
Public
Spaces












5,000,000


151

St.
Louis

MO

CDBG

Delmar
Streetscape
Improvements‐‐Tucker
to
Jefferson












5,000,000


151

St.
Louis

MO

CDBG

Hall
Street
Drainage/Streetscape
Improvements












5,000,000


151

St.
Louis

MO

CDBG

North
Broadway
Streetscape
Improvements












5,000,000


151

St.
Louis

MO

CDBG

River
des
Peres
Streetscape/Drainage
Improvements












5,000,000


151

St.
Louis

MO

CDBG

Skinker
Boulevard‐‐Delmar
to
Dr.
MLK












5,000,000


151

St.
Louis

MO

CDBG

Arlington
Grove
Infrastructure‐‐Dr.
MLK,
Union,
Lotus,
City
Limits












5,500,000


166

St.
Louis

MO

CDBG

Grand
Center
Streetscape
Improvements












5,675,000


171

City

State

Program

St.
Louis

MO

CDBG

Morganford
Streetscape
Improvements‐‐Chippewa
to
Holly
Hills

Project
Descrip3on

Funding
Required 










6,000,000


Jobs 180

St.
Louis

MO

CDBG

St.
Louis

MO

CDBG

Laclede's
Landing
Cobblestone
Renova3on/Streetscape
Enhancements












6,000,000


181

Norville
Brown
Teen
Center
Renova3on/Construc3on












6,500,000


St.
Louis

MO

196

CDBG

Soldiers
Memorial
Improvements












7,000,000


St.
Louis

211

MO

CDBG

Various
Enhancements‐‐Non‐Arterial
Streets
throughout
City












7,000,000


211

St.
Louis

MO

CDBG

North
Central
Plan
Infrastructure
Implementa3on‐‐Enright,
Page,
Vandeventer,
Sarah












7,500,000


227

St.
Louis

MO

CDBG

Federal
Mogul
Acquisi3on/Site
Prepara3on












7,700,000


233

St.
Louis

MO

CDBG

North
Kingshighway
Streetscape
Improvements‐‐Dr.
MLK
to
W.
Florissant












8,000,000


242

St.
Louis

MO

CDBG

Parc
Pacific
Park
Enhancements/Event
Space












9,000,000


272

St.
Louis

MO

CDBG

Various
Recrea3on
Center
Enhancements












9,500,000


287

St.
Louis

MO

CDBG

North
Side
Recrea3on
Center










10,000,000


302

St.
Louis

MO

CDBG

South
Broadway
Streetscape
Improvements‐‐Arsenal
to
Delor










10,000,000


302

St.
Louis

MO

CDBG

South
Jefferson
Streetscape
Improvements‐‐Chouteau
to
Broadway










10,000,000


302

St.
Louis

MO

CDBG

University
of
Missouri
St.
Louis
Public
Media
Educa3on
Center










11,000,000


332

St.
Louis

MO

CDBG

Branch
Street
Trestle
Bicycle/Pedestrian
Trail
Extension










15,000,000


453

St.
Louis

MO

CDBG

Natural
Bridge
Streetscape
Improvements‐‐N.
Florissant
to
N.
Kingshighway










15,000,000


453

St.
Louis

MO

CDBG

VA
Hospital/Grand
Center
Retail/Parking
Structures










19,750,000


596

St.
Louis

MO

CDBG

St.
Louis
Center
Retail/Parking
Conversion










20,000,000


604

St.
Louis

MO

CDBG

Kiel
Retail/Parking
Structure
Development










30,000,000


906

St.
Louis

MO

CDBG

Downtown/Central
Business
District
Streetscape
Improvements
(66
Blocks)










33,000,000


997

St.
Louis

MO

CDBG

Gateway
Mall
Park
Enhancements










50,000,000


1510

St.
Louis

MO

CDBG

Vandeventer/Southwest/Kingshighway
Streetscape












1,000,000


30

St.
Louis

MO

CDBG

Terry
Park
Improvements












1,500,000


45

St.
Louis

MO

CDBG

Michigan
Avenue
Streetscape
(E.
Davis
to
Schirmer)












2,300,000


69

St.
Louis

MO

CDBG

Jamieson
Streetscape
Improvements
(Arsenal
to
Chippewa)












3,000,000


91

St.
Louis

MO

CDBG

South
Broadway
Streetscape
(Courtois
to
Upton)












3,000,000


91

St.
Louis

MO

CDBG

Gravois
Avenue
Streetscape
(Loughborough
to
Tab)












6,500,000


196

St.
Louis

MO

CDBG

South
Kingshighway
Boulevard
Streetscape
(Christy
to
Southwest)












8,000,000


242

St.
Louis

MO

CDBG

Center
for
Emerging
Technologies
Expansion










10,000,000


300

St.
Louis

MO

CDBG

Main
Public
Library
Moderniza3on










15,000,000


450

St.
Louis

MO

CDBG

Zoo
Improvements,
Various










15,420,000


462

St.
Louis

MO

CDBG

Municipal
Dock
Repair/Replacement










20,000,000


604

St.
Louis

MO

Energy

"Green"
Pedestrian
Ligh3ng
in
Area
of
I‐70,
W.
Florissant,
Riverview












3,000,000


91

St.
Louis

MO

Energy

New
Energy‐EFficient
Street
Department/Equipment
Services
Building










17,000,000


540

St.
Louis

MO

Energy

City
Hall
Renova3on‐‐Electrical
Moderniza3on










25,000,000


755

St.
Louis

MO

Energy

Historic
Police
Headquarters
Energy
Enhancement/Retrofit










25,000,000


755

St.
Louis

MO

Energy

City
Government
Recycling
Program
Expansion












4,500,000


St.
Louis

MO

Energy

City‐Wide
Single‐Family
Residen3al
Recycling
Program
Expansion










18,000,000


St.
Louis

MO

Energy

Replacement
of
Petroleum‐Fueled
City
Fleet
Vehicles
with/Energy
Efficient
Fuel
System
Vehicles










41,700,000


St.
Louis

MO

Energy

Reforesta3on
of
City
Parks












6,500,000


196

St.
Louis

MO

Energy

Energy‐Efficient
Ligh3ng
Upgrades‐‐All
City
Facili3es










10,000,000


302

St.
Louis

MO

Energy

City‐Owned
Buildling
HVAC
Energy
Efficient
Replacements/Upgrades










20,000,000


604

St.
Louis

MO

Energy

Solar
Power
Augmenta3on
in
City‐Owned
Buildings
for
Green
Power
and
Peak
Load
Shedding











21,250,000


642

St.
Louis

MO

Energy

Conven3on
Center
LEED
Cer3fica3on
Repairs/Replacements/Enhancements










51,245,000


1548

St.
Louis

MO

Housing

6323
Minnesota














225,000


6.795

St.
Louis

MO

Housing

2821
Texas














250,000


7.55

St.
Louis

MO

Housing

3139
Ohio














250,000


7.55

St.
Louis

MO

Housing

Aubert
Place














350,000


10.57

St.
Louis

MO

Housing

4557
Flad














400,000


12.08

St.
Louis

MO

Housing

Cabanne
Homes
(AA)














400,000


12.08

St.
Louis

MO

Housing

Riverview‐West
Florissant
Scafered
Sites














490,000


14.8

St.
Louis

MO

Housing

2801
Wyoming














500,000


15.1

St.
Louis

MO

Housing

3143
and
3145
Ohio














500,000


15.1

St.
Louis

MO

Housing

3324
Missouri














500,000


15.1

St.
Louis

MO

Housing

King's
Estates














600,000


18.12

St.
Louis

MO

Housing

Blue
Shufers
Historic
Homes














650,000


19.63

St.
Louis

MO

Housing

Tower
Grove
East
Building
A
Neighborhood
of
Dreams














650,000


19.63

St.
Louis

MO

Housing

Greater
Ville
Community
Center














700,000


21.14

St.
Louis

MO

Housing

5020,
5022,
5024
West
Florissant














735,000


22.2

St.
Louis

MO

Housing

RHCDA/Community
Renewal
Affordable
Homes














750,000


22.65

St.
Louis

MO

Housing

Cochran
Gardens
HOPE
VI
Inrastructure












1,400,000


42

St.
Louis

MO

Housing

Arlington
Heights












2,000,000


60.4

St.
Louis

MO

Housing

Ville
Estates












2,000,000


60.4

St.
Louis

MO

Housing

Murphy
Park
Early
Childhood
Center












9,600,000


290

St.
Louis

MO

Public
Safety

Purchase
a
911
Radio
Dispatch
and
Report
Wri3ng
System














100,000


12

St.
Louis

MO

Public
Safety

New
Police
Evidence
Warehouse












2,500,000


76

St.
Louis

MO

Public
Safety

Department
of
Public
Safety
Informa3on
Systems
Upgrades












1,500,000


St.
Louis

MO

Public
Safety

Consolidated
Public
Safety
Answering
Point










20,000,000


St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Furnishings












5,000,000


10

St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Site
Improvements












9,800,000


296

604

City

State

Program

St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐School
Interior
Finishes

Project
Descrip3on

Funding
Required Jobs 








14,800,000
 447

St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Exterior
Enclosure
Repairs/Replacements










23,000,000


St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Lead
Abatement/Remedia3on










25,000,000


752

St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Plumbing
Upgrades/Replacements










44,300,000


1336

St.
Louis

MO

Schools

St.
Louis
Public
School
Buildings‐‐Electrical
Upgrades










52,300,000


1579

St.
Louis

MO

Schools

St.
Louis
Public
Schools‐‐Addi3onal
Interior/Exterior/Systems
Repairs/Replacements/Enhancements












7,540,000


228

St.
Louis

MO

Streets/Roads

Manchester/McCausland
Traffic
Improvements












1,000,000


30

St.
Louis

MO

Streets/Roads

Loughborough/I‐55
Bridge
Expansion












1,500,000


45

St.
Louis

MO

Streets/Roads

Wellington
Bridge
Replacement












3,000,000


91

St.
Louis

MO

Streets/Roads

Lafayefe/I‐55
Ramp
Reconfigura3on












4,000,000


121

St.
Louis

MO

Streets/Roads

Skinker/McCausland/Clayton
Road/I‐64
Intersec3on
Improvements












4,000,000


121

St.
Louis

MO

Streets/Roads

Off‐System
Preven3ve
Bridge/Road
Maintenance












6,000,000


180

St.
Louis

MO

Streets/Roads

On‐System
Preven3ve
Bridge/Road
Maintenance












6,000,000


181

St.
Louis

MO

Streets/Roads

On‐System
Preventa3ve
Maintenance












6,000,000


210

St.
Louis

MO

Streets/Roads

Compton
Avenue
Bridge
Renova3on/Replacement












7,000,000


211

St.
Louis

MO

Streets/Roads

I‐70/Mississippi
River
Bridge‐‐Extension
of
Cass/Bridge
Exit
Ramps
to
Tucker












8,000,000


242

St.
Louis

MO

Streets/Roads

McCausland/Ellendale/Wabash
Traffic
Improvements












8,000,000


242

St.
Louis

MO

Streets/Roads

Various
Traffic
Signal
Interconnects










12,000,000


360

St.
Louis

MO

Streets/Roads

Arterial
Resurfacing/Enhancements‐‐Various
Streets










15,000,000


453

St.
Louis

MO

Streets/Roads

S.
Kingshighway
Bridge
Replacement
at
Union
Pacific
Tracks










17,000,000


513

St.
Louis

MO

Streets/Roads

Chestnut/I‐64
Interchange
Reconfigura3on










29,000,000


604

St.
Louis

MO

Streets/Roads

Tucker
Avenue
Bridge
Replacement‐‐Cass
to
Washington










35,000,000


1057

St.
Louis

MO

Streets/Roads

Regional
Wayfinding
Program












1,000,000


30

St.
Louis

MO

Streets/Roads










15,000,000


451

St.
Louis

MO

Transit

I‐70
Mississippi
River
Bridge‐‐Extension
of
Cass/Bridge
Connec3on
to
Tucker/N.
Florissant,
Other
Companion
 Street
Improvements Regional
Transit
Data
Infrastructure
Upgrade












5,000,000


151

St.
Louis

MO

Transit

Transit
Rolling
Stock
Replacement












5,000,000


151

St.
Louis

MO

Transit

Grand
Avenue
MetroLink
Sta3on
Upgrades/Grand
Avenue
Bridge










16,550,000


500

St.
Louis

MO

Transit

Eads
MetroLink/Vehicular
Bridge
Rehabilita3on










25,000,000


755

St.
Louis

MO

Transit

Fixed
Lane
Trolley
Development‐‐Serving
"Loop"/Washington
University










35,000,000


906

St.
Louis

MO

Transit

Light
Rail
Rehabilita3on/Preven3ve
Maintenance‐‐Original
1993
Alignment










45,000,000


1359

St.
Louis

MO

Transit

Transit
System
Opera3ng
Deficit










50,000,000


1510

St.
Louis

MO

Transit

North/South
MetroLink
Extensions








900,000,000
 20000

St.
Louis

MO

Water

Kingshighway
and
Pipe
Yard
Facili3es
Improvements














350,000


13

St.
Louis

MO

Water

Macklind
Ouzall
Separa3on/Other
Overflow
Improvements












1,000,000


30

St.
Louis

MO

Water

Wharf
Street
Pump
Sta3on
Replacement












1,000,000


30

St.
Louis

MO

Water

Bissell
Point
Treatment
Plant
Repairs/Improvements












1,300,000


39

St.
Louis

MO

Water

Historic
Water
Tower
Renova3ons












1,400,000


42

St.
Louis

MO

Water

Seismic
Bypass
at
Stacey
Park
Reservoir












1,500,000


45

St.
Louis

MO

Water

Water
Main
Renova3ons












1,500,000


45

St.
Louis

MO

Water

Water
Treatment
Plant
Improvements












2,850,000


86

St.
Louis

MO

Water

Water
Distribu3on
System
Improvements












3,500,000


106

St.
Louis

MO

Water

Floodwall
Repairs/Enhancements










20,000,000


604

St.
Louis

MO

Water

"Green"
Alley
Reconstruc3on










30,000,000


906

St.
Louis

MO

Water

Harlem‐Baden
Relief
Deten3on
System










35,500,000


1072

Wellston

MO

Public
Safety

Bay
Springs

MS

Airport

The
City
of
Wellston
would
like

to
hire
5
addi3onal
officers
and
obtain
3
police
cars.
This
would
enable
the
city
 to
be
patroled
at
all
3mes. Enviromental
Study
at
Thigpen
Field

Bay
Springs

MS

Airport

Runway
Extension
at
Thigpen
Field

Bay
Springs

MS

CDBG

1,000
gpm
water
well

Bay
Springs

MS

CDBG

Bay
Springs

MS

Bay
Springs

695














125,000


5
















50,000


12












1,800,000


12














500,000


10

Rework
Lib
Sta3ons
(13)














650,000


12

CDBG

300,000
elevated
storage
tank














650,000


18

MS

CDBG

Construct
East
Industrial
Park
Ave














250,000


45

Bay
Springs

MS

CDBG

Construct
West
Industrial
Park
Ave














250,000


45

Bay
Springs

MS

Streets/Roads

Overlay
East
1st
Street
















70,000


25

Bay
Springs

MS

Streets/Roads

Overlay
East
Eighth
Avenue
















70,000


25

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Ainsworth
Drive














325,000


35

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Bayless
Drive














250,000


35

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Commerce
Drive














375,000


35

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Edmonton
king
Road














625,000


35

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Henry
Road














125,000


35

Bay
Springs

MS

Streets/Roads

Widen
and
overlay
Houston
Street
















35,000


35

Bay
Springs

MS

Streets/Roads

Construct
Reed
Drive
















60,000


45

Bay
Springs

MS

Water

Replacement
of
fire
hydrants
(60
each)














180,000


4

Bay
Springs

MS

Water

pain3ng
of
300,000
gallon
elevated
water
tank














150,000


6

Bay
Springs

MS

Water

Pain3ng
of
wastewater
treatment
plant
















65,000


6

Bay
Springs

MS

Water

Plug
and
abandon
old
water
wells














150,000


6

Bay
Springs

MS

Water

Fire
protec3on
water
main
along
Hwy
18
















50,000


8

Bay
Springs

MS

Water

Fire
protec3on
water
main
along
Hwy
528














125,000


8

Bay
Springs

MS

Water

Fire
protec3on
water
main
along
Hwy
531
















75,000


8

City

State

Program

Bay
Springs

MS

Water

Grit
Chamber
for
wastewater
treatment

Project
Descrip3on

Bay
Springs

MS

Water

Replace
sewer
on
5th
street
















35,000


8

Bay
Springs

MS

Water

Replace
sewer
at
intersec3on
of
Hwy
15
&
18














100,000


15

Belzoni

MS

CDBG

Belzoni

MS

CDBG

Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk
 network. Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
street
system.

Belzoni

MS

CDBG

Beulah

MS

CDBG

Water
and
sewer
improvements
‐
Replacement
and
repair
of
water
distribu3on
and
wastewater
collec3on
and
 treatment
system
for
en3re
town. Fire
Sta3on
‐
Renova3on
of
exis3ng
fire
sta3on
to
include
kitchen,
mee3ng
room,
and
ADA
accessibility.

Beulah

MS

CDBG

Town
Hall
‐
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility.

Beulah

MS

CDBG

Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.

Beulah Biloxi

MS MS

CDBG Streets/Roads

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 Hickory
Hill
Circle
Water
Line
Replacement

Biloxi

MS

Streets/Roads

Biloxi

MS

Streets/Roads

Brodie
Road
Widening‐
including
future
water
services,
sanitary
sewer
improvements
and
drainage
 improvements Popp's
Ferry
Road
Extension
from
Pass
Road
to
Railroad
Tracks
‐
including
water,
sewer,
&
drainage

Biloxi

MS

Streets/Roads

Rue
Pe3t
Bois
Phase
II
‐
includes
drainage
improvements
&
road
repairs
in
this
subdivision

Biloxi

MS

Streets/Roads

Coahoma

MS

CDBG

Coahoma

MS

CDBG

Televise
sanitary
sewers
and
storm
drains
citywide
not
in
Katrina
surge
areas,
iden3fy
&
repair
damaged
lines
 with
cured
in
place
piping Renovate
and
upgrade
library
&
resource
center
to
provide
following
services
and
ac3vi3es:
job
training
and
 retraining,
broadband(
e
commerce,
community/economic
development,
educa3onal
enrichment,
etc.),
&
 employment
readiness
ac3vi3es,
drop
out
pre Mul3‐purpose
structure
to
include
town
hall,
police
dept.,
parking
and
ADA
accessibiliity

Coahoma

MS

CDBG

Coahoma

MS

CDBG

Coahoma

MS

CDBG

Coahoma

MS

CDBG

Coahoma

MS

Energy

Renovate
homes
within
community
to
be
more
energy
efficent
as
well
as
equip
them
with
the
capacity
to
 u3lize
alterna3ve
innova3ve
fuel
consump3on
upgrades.
etc.
(
solar
energy
).

Coahoma

MS

Public
Safety

Police
Vehicles
(2)
















45,000


Coahoma

MS

Public
Safety

Youth
Mentor/Resource
Liasion
















50,000


1

Coahoma

MS

Public
Safety

Police
Officers
(2)
















60,000


2

Coahoma

MS

Schools












1,500,000


4

Coahoma

MS

Water

Community
Based
Parent
Involvement
Center/Coordinator
&
resource
team (Housed
@
Town
Hall
or
Community
Resource
Center) 1000
gpm
Water
Well














500,000


10

Coahoma

MS

Water












2,000,000


15

Columbia

MS

Streets/Roads

Water

and
Sewer
Improvements
‐
upgrade
and
extend
exis3ng
water
and
sewer
lines,
install
fire
plugs
 throughout
the
town
and
refurbish
water
tower Street
reconstruc3on










35,000,000


10

Crenshaw

MS

CDBG

develop
outdoor
recrea3onal
park














200,000


10

Crenshaw

MS

CDBG

construc3on
of
a
mul3‐purpose
building














500,000


20

Crenshaw

MS

CDBG

construc3on
of
a
municipal
building














500,000


20

Doddsville

MS

CDBG

Pedestrian
improvements
‐
Construc3on
of
ADA
accessible
sidewalk
network
throughout
town.
















75,000


8

Doddsville

MS

CDBG

Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking,
and
ADA
accessibility.














250,000


12

Doddsville

MS

CDBG

Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.














680,000


18

Doddsville

MS

CDBG












1,000,000


20

Friars
Point

MS

CDBG

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 and
treatment
system
for
en3re
town. Town
Hall
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility














375,000


10

Friars
Point

MS

CDBG














275,000


20

Friars
Point

MS

CDBG

Water
and
Sewer
improvements
Replacements
and
repair
of
water
distribu3on
and
wastewater
collec3on
and
 treatmentsystem
of
en3re
town Street
improvement
overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
street
system














350,000


25

Friars
Point

MS

CDBG

Construc3on
of
a
Inter‐Genera3onal
Day
Care
Center
to
include
parking
and
accessibility












4,150,000


60

Friars
Point

MS

Housing

Construct
25
houses
for
first
3me
buyers
including
land
acqusi3on












1,000,000


25

Friars
Point

MS

Public
Safety

Purchase
two
(2)
police
cars
















50,000


1

Friars
Point

MS

Public
Safety

Hire
two
(2)
police
officers
















60,000


2

Friars
Point

MS

Schools
















50,000


5

Friars
Point

MS

Schools














500,000


5

Friars
Point

MS

Schools

Elementary
Classroom
Mobile
Laptop
Carts:
This
project
is
for
implementa3on
of
mobile
laptop
carts
at
Friars
 Point
Elementary
School Friars
Point
Elementary
School
purchase
and
install
projectors
and
smartboards.

Installs
new
teaching
tool
for
 classroom
installa3on Friars
Point
Elementary
School
Video
Surveillance
System
Installa3on

Friars
Point

MS

Schools

New
Construc3on
of
Friars
Point
Elementary
School
Math
and
Science
Wing

Goodman

MS

Water

Greenville

MS

Airport

Greenville

MS

CDBG

Greenville

MS

CDBG

Greenville

MS

CDBG

The
town
of
Goodman,
MS
is
located
in
Holmes
County
Mississippi.
The
Town
currently
has
approximately
450
 water
meter
customers,
both
commercial
and
residen3al.
The
Town
needs
to
update
and
upgrade
it's
water
 meters
and
water
meter
reading
system.
The
pr Mid
Delta
Regional
Airport
Security
Enhancements
‐
To
upgrade
airport
security
perimeters
and
controls
that
 limit
access
into
secured
airport
areas Historic
Masonic
Lodge
Building
Restora3on
‐
to
restore
the
historic
Masonc
Lodge
Hall
Building
in
downtown
 Greenville Police
and
Fire
Fighters
Health
and
Wellness
Center
‐
To
construct
a
Health
and
Wellness
Center
for
Police
and
 Fire
Fighters Municipal
Youth
Baseball
and
Basketball
Facili3es
Moderniza3on
‐
To
complete
needed
renova3ons
and
 infastructure
enhancements
in
3
youth
recrea3onal
facili3es
and
4
baseball
fields

Renovate
exis3ng
former
Hull
School
brick
building
for
mul3purpose
usage
(neighborhood
center),
suitable
for
 emergency
shelter
and
ADA
accessibility Renovate
exis3ng
community
gymnasium
into
Wellness
Center
with
ADA
accessibility
to
include
athle3c
field
 and
recrea3onal
park Street
Improvements‐Overlay
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town's
street
system
and
 sidewalks Redevelopment
of
Main
Street
including
sidewalks,
ligh3ng,
and
purchase
&
rehab
of
old
buildings

Funding
Required 












150,000


Jobs 8














375,000


16












2,200,000


28












3,500,000


30
















75,000


8














150,000


10












1,600,000
 










2,500,000


20 28














500,000


20












3,500,000


50












6,000,000


50












2,000,000


50








100,000,000


50












1,000,000


10














750,000


15














750,000


15












1,300,000


20












1,000,000


20












1,500,000


25














750,000


12














150,000


5














300,000


20














600,000


4












4,000,000


95












2,000,000


47












2,000,000


47












5,000,000


119

City

State

Program

Greenville

MS

CDBG

Greenville

MS

CDBG

Greenville

MS

CDBG

Greenville

MS

CDBG

Greenville

MS

CDBG

Greenville

MS

Energy

Greenville

MS

Streets/Roads

Greenville
Police
Department
Headquarters
Building
Renova3ons
‐
To
renovate
and
equip
the
current
police
 sta3on
to
current
standards Na3onal
Mississippi
Delta
Heritage
Corridor
Development
Project
‐
To
begin
redevelopment
of
the
downtown
 "Na3onal
Heritage"
area
of
Greenville
to
be
known
as
the
Na3onal
Mississippi
Delta
Heritage
Corridor
to
 include
the
Mississippi
Delta
Museum,
Bass Targeted
Cri3cal
Street
Revitaliza3on
Project
‐
To
complete
needed
repairs
to
11
cri3callydegraded
major
 streets
in
the
City
of
Greenville Municipal
Bridge
and
Thoroughfare
Restora3on
Project
‐
To
complete
repairs
and
restora3on
of
3
major
 bridges
and
street
approaches Roadway
Drainage
Mi3ga3on
and
Safety
Project
‐
To
perform
needed
drainage
mi3ga3on
construc3on
projects
 impac3ng
major
municipal
roadways Greenville
City
Hall
Ligh3ng
Efficiency
upgrades
‐
to
replace
ligh3ng
throughout
city
hall
for
more
energy
 efficent
and
cost
effec3ve
products 1.
TN
Gas
Road
Project
‐
to
complete
needed
repairs
to
major
road
on
expanding
side
of
city

Project
Descrip3on

Greenville

MS

Streets/Roads

Greenville

MS

Greenville

MS

Greenville

MS

Water

Greenville

MS

Water

Greenville

MS

Water

Greenwood

MS

Greenwood

Funding
Required

Jobs












7,500,000


178










15,600,000


371










23,000,000


547










28,000,000


666










42,000,000


1000














750,000


18












1,000,000


23

Greenville
Airport
Road
Reconstruc3on












5,000,000


119

Streets/Roads

Route
82
Bypass
‐
To
construct
the
Route
82
Bypass
in
Greenville,
MS










80,000,000


1904

Water












2,000,000


47










12,000,000


285










34,000,000


809










74,000,000


1700

Airport

Municipal
Water
System
Emergancy
Power
System
Replacement
‐
To
provide
emergancy
power
genera3on
at
 each
of
the
11
municipal
water
wells Municipal
Water
System
Ozona3on
Program
‐
to
remove
the
turbidity
(brown
color)
from
the
municipal
 drinking
water
system Neighborhood
Drainage
Enhancement
and
Flood
Mi3ga3on
Projects
‐
To
address
cri3cal
neighborhood
 drainage
and
flood
mi3ga3on
problems Municipal
Sewer
System
Rehabilita3on
Project
‐
to
address
cri3cal
rehabilita3on
needs
of
the
exis3ng
 municipal
sewer
system Airport
improvements
‐
Including
control
tower,
runways,
and
accessory
buildings.












2,500,000


20

MS

Amtrak

Depot
renova3on
‐
Renova3on
to
exis3ng
AMTRAK
passenger
depot
to
include
parking
and
ADA
accessibility.














600,000


21

Greenwood

MS

CDBG












1,200,000


22

Greenwood

MS

CDBG












7,000,000


35

Greenwood

MS

CDBG

Community
center
improvement
‐
Renova3on
of
exis3ng
community
center
to
include
electrical,
plumbing,
 HVAC,
kitchen,
parking,
and
ADA
accessibility. Downtown
streetscape
improvements
‐
Upgrade
of
exis3ng
sidewalk
network,
crosswalks,
ADA
accessibility,
 underground
u3li3es,
ligh3ng,
and
landscaping. Street
improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
needed
areas
of
city
street
system.










25,000,000


48

Greenwood

MS

CDBG










25,000,000


48

Greenwood

MS

Schools










20,000,000


48

Greenwood

MS

Schools










30,000,000


58

Greenwood

MS

Streets/Roads










12,000,000


24

Gunnison

MS

CDBG

Gunnison

MS

CDBG

Gunnison

MS

CDBG

Gunnison

MS

Water

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 and
treatment
system
for
en3re
town. refurbish
elevated
water
storage
tower

Gunnison

MS

Water

Gunnison

MS

Haqesburg

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 and
treatment
system
in
the
city. Public
School
Moderniza3on
‐
Demoli3on
and
construc3on
of
Bankston
elementary
school
to
include
parking,
 traffic
circula3on,
informa3on
technology
upgrades,
and
ADA
accessibility. Public
School
Moderniza3on
‐
Renova3on
and
reconstruc3on
of
public
schools
located
throughout
the
 Greenwood
municipal
school
district
to
include
parking,
traffic
circula3on,
informa3on
technology
upgrades,
 and
ADA
accessibility. Street
improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
needed
areas
of
city
street
system. Fire
Sta3on
‐
Renova3on
and
repair
of
exis3ng
fire
sta3on
to
include
kitchen,
mee3ng
room,
and
ADA
 accessibility. Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.
















75,000


8












1,750,000


20












2,800,000


28














240,000


6

rehabilitate
water
distribu3on
lines














350,000


6

Water

rehabilitate
wastewater
treatment
facility/#1
pump
sta3on














400,000


8

MS

Airport

Bobby
Chain
Airport
Drainage
Improvements
Phase
II














350,000


8

Haqesburg

MS

Airport

Bobby
Chain
Airport
Drainage
‐
Priests
Creek














750,000


12

Haqesburg

MS

Airport

Bobby
Chain
Airport
Runway/Taxiway
Ligh3ng














150,000


12

Haqesburg

MS

Airport

Bobby
Chain
Airport
ILS














450,000


15

Haqesburg

MS

Airport

Bobby
Chain
Airport
Runway/Taxiway
Extension












3,000,000


45

Haqesburg

MS

CDBG

Gordan's
Creek
Banks
Stabiliza3on













2,000,000


10

Haqesburg

MS

CDBG

Tatum
Soccer
Field
Reconstruc3on














500,000


15

Haqesburg

MS

CDBG

East
and
West
4th
Street
Drainage
Improvements












4,000,000


20

Haqesburg

MS

CDBG

Mobile/Bouie
Street
Drainage
Improvements












1,700,000


20

Haqesburg

MS

CDBG

Tipton
Street
Drainage
Improvements















885,000


20

Haqesburg

MS

CDBG

Longleaf
Trace
Phase
IV
‐
Parking
Lot














300,000


28

Haqesburg

MS

CDBG

Longleaf
Trace
Phase
V
‐
Extension
Downtown














500,000


30

Haqesburg

MS

CDBG

Innova3on
and
Commercializa3on
Park
Eastern
Access












1,500,000


35

Haqesburg

MS

CDBG

Innova3on
and
Commercializa3on
Park
Southern
Boulevard












2,000,000


40

Haqesburg

MS

CDBG

Innova3on
and
Commercializa3on
Park
Southern
Boulevard












2,500,000


40

Haqesburg

MS

CDBG

Longleaf
Trace
Phase
VI
‐
Leaf
River
Bridge














900,000


42

Haqesburg

MS

CDBG

Chain
Park
Phase
II
‐
Complete
mul3‐purpose
trail
and
park
along
the
Leaf
River












1,161,000


50

Haqesburg

MS

Energy

Downtown
Ligh3ng














750,000


18

Haqesburg

MS

Energy

South
Lagoon
Aera3on
Improvements












3,000,000


25

Haqesburg

MS

Streets/Roads

Traffic
Signal
at
Veterans
Memorial
Boulevard














100,000


12

Haqesburg

MS

Streets/Roads

Rails
to
Trails
Phase
II














930,000


20

Haqesburg

MS

Streets/Roads

Mar3n
Luther
King
Phase
II














750,000


35

Haqesburg

MS

Streets/Roads

Penton
Road














950,000


35

Haqesburg

MS

Streets/Roads

South
28th
Avenue
reconstruc3on












1,500,000


35

Haqesburg

MS

Streets/Roads

Truck
Route
between
James
Street
and
East
Hardy
Street












2,500,000


35

Haqesburg

MS

Streets/Roads

4th
Street
Improvements
Phase
II












4,000,000


50

Haqesburg

MS

Streets/Roads

ITS
Improvements
Phase
III












3,280,000


50

City

State

Program

Haqesburg

MS

Streets/Roads

Roadway
Ligh3ng
‐
Provide
ligh3ng
along
main
corridors
in
and
out
of
Haqesburg

Project
Descrip3on

Funding
Required 










7,500,500


Jobs 50

Haqesburg

MS

Streets/Roads

Traffic
Signal
Improvements
‐
Upgrade
signals
from
exis3ng
span‐wire
to
mast‐arm












7,380,700


50

Haqesburg

MS

Water

Highway
98
Booster
Sta3on

Haqesburg

MS

Water

Bouie
Street
Sewer
Improvements

Haqesburg

MS

Water

Haqesburg

MS

Water

Haqesburg

MS

Haqesburg














350,000


5












1,600,000


10

Lamar
Boulevard
Sanitary
Sewer














500,000


12

Tatum
Road/Bonhomie
Sanitary
Sewer














275,000


12

Water

Bonhomie
Water
Main














350,000


15

MS

Water

Bouie
Street
Water
Improvements












1,150,000


15

Haqesburg

MS

Water

J.
Ed
Turner/Jackson
Road
Water
Main














500,000


15

Haqesburg

MS

Water

Oak
Grove
Water
Main














950,000


15

Haqesburg

MS

Water

Replace
Water
Main
at
Country
Club
Estates














925,000


15

Haqesburg

MS

Water

Oak
Grove
Water
Tank














750,000


18

Haqesburg

MS

Water

Replace
Sanitary
Sewer
along
Arledge














475,000


18

Haqesburg

MS

Water

Replace
Sanitary
Sewer
along
Highway
42














500,000


18

Haqesburg

MS

Water

Replace
Sanitary
Sewer
along
Klondyke














450,000


18

Haqesburg

MS

Water

North
Lagoon
Expansion












2,000,000


25

Ifa
Bena

MS

CDBG














300,000


18

Ifa
Bena

MS

CDBG

City
Hall
Complex
‐
Construc3on
of
new
City
Hall
complex
to
include
administra3ve
offices,
community
 mee3ng
space,
parking,
and
ADA
accessibility. Street
Improvements
‐
Overlay,
curb
and
gufer,
and
storm
drainage
for
en3re
city
street
system.












2,500,000


22

Ifa
Bena

MS

CDBG












2,500,000


30

Ifa
Bena

MS

CDBG

Water
and
Sewer
Improvements
‐
Renova3on
and
replacement
of
city
water
supply,
distribu3on,
and
 wastewater
collec3on
and
treatment
systems.
 Drainage
Improvements
‐
Replacement,
repair,
and
new
construc3on
of
city
storm
drainage
system.












3,500,000


38

Jackson

MS

Airport

Dispatch
Consol
and
Radios
















95,000


0

Jackson

MS

Airport

Disparity
Study














300,000


5

Jackson

MS

Airport

Hawkins
Field
Stormwater
Drainage
Improvements
Phase
1














171,000


5

Jackson

MS

Airport

Hawkins
Field
storm
drainage














900,000


10

Jackson

MS

Airport

Master
Plan
Update
‐
JEIA

Jackson

MS

Airport

Passenger
Boarding
Bridges
‐
JEIA

Jackson

MS

Airport

Jackson

MS

Jackson














392,739


10












2,672,303


10

Hawkins
Field
signage
and
markings














332,500


12

Airport

Apron
Repairs
‐
JEIA














491,000


20

MS

Airport

Access
control
at
Hawkins
Field












3,000,000


35

Jackson

MS

Airport

Installa3on
of
Perimeter
Road
‐
Airside
JEIA












5,000,000


40

Jackson

MS

Airport

Pavement
Rehabilita3on
‐
JEIA












6,270,000


40

Jackson

MS

Airport

Rehabilita3on
of
Storm
Water
Infrastructure
‐
JEIA












3,135,000


45

Jackson

MS

Airport

Access
Control
Security
‐
JEIA












1,914,233


50

Jackson

MS

Airport

Expansion
of
Interna3onal
Drive
to
4
lanes
‐
JEIA










15,000,000


150

Jackson

MS

Airport

Runway
extension
at
Hawkins
Field










15,000,000


150

Jackson

MS

Airport

Reloca3on
of
ATC
Tower
‐
JEIA










15,000,000


200

Jackson

MS

Airport

Runway
extension
at
JEIA










30,000,000


200

Jackson

MS

CDBG

Jackson
Zoo
‐
Administra3on
Building
needs
pain3ng,
restroom
work
and
the
heat
pump
replaced

Jackson

MS

CDBG
















34,000


Jackson

MS

CDBG

Jackson
Zoo
‐
Change
the
Educa3on
Building
to
the
Marke3ng/Events
Building,
repair
roof
and
other
general
 maintenance
repairs Jackson
Zoo
‐
Remove
/
add
another
metal
storage
building
(Old
Green
Bird
Barn)

Jackson

MS

CDBG

Jackson
Zoo
‐
Remove
Parkins
Building
















60,000


Jackson

MS

CDBG

Jackson
Zoo
‐
Water.Drainage
Lines
‐
Noted
in
plan
in
four
sec3ons
‐
one
and
two
at
the
same
3me
















40,700


Jackson

MS

CDBG

Jackson
Zoo‐
Roof
replaced
on
facili3es
office
















27,775


Jackson

MS

CDBG

Mississippi
Municipal
Art
Gallery
Roof
















60,000


2

Jackson

MS

CDBG

Smith
Robertson
Community
Center
Roof














150,000


2

Jackson

MS

CDBG

Smith
Robertson
Museum
&
Cultural
Center
Roof














150,000


2

Jackson

MS

CDBG

Macon
Street
Drainage
Improvements














400,000


3

Jackson

MS

CDBG

Mary
C.
Jones,
Early
Childhood
Development
Center
Roof














300,000


4

Jackson

MS

CDBG

Legion
Park
sobball
field
(4‐plex)














750,000


5

Jackson

MS

CDBG

Mississippi
Art
Center
Roof














350,000


5

Jackson

MS

CDBG

Eubanks
Creek
From
Meadow
Drive
to
Northside
Drive












1,000,000


6

Jackson

MS

CDBG

Eubanks
Creek
From
Northview
Drive
to
Old
Canton
Road












1,500,000


6

Jackson

MS

CDBG

Town
Creek
Tributary
No.
4
From
Medgar
Evers
to
Erie
Street














800,000


6

Jackson

MS

CDBG

Town
Creek
Tributary
No.
5
From
Northside
Drive
to
Utah
Street














800,000


6

Jackson

MS

CDBG

Tributary
of
Belhaven
Creek
From
Riverside
Drive
to
Belhaven
Creek












1,000,000


6

Jackson

MS

CDBG

Tributary
of
Trahon
Creek
on
Swan
Lake
Cove














800,000


6

Jackson

MS

CDBG

Belhaven
Creek
From
Woodrow
Wilson
to
Riverside
Drive














800,000


7

Jackson

MS

CDBG

Caney
Creek
From
Terry
Road
to
Meadowlane
including
Sunset
Terrace












1,500,000


7

Jackson

MS

CDBG

Lynch
Creek
Drainage
Improvements
on
Queen
Eleanor












1,500,000


7

Jackson

MS

CDBG

Purple
Creek
Stream
#2
From
Northpointe
Drive
to
Rolling
Meadows
Drive












1,000,000


8

Jackson

MS

CDBG

Town
Creek
Tributary
No.
4
From
Main
Street
to
Channel

Jackson

MS

CDBG

Eubanks
Phase
II

Jackson

MS

CDBG

Sunset
Drive
Bridge
Replacement

Jackson

MS

CDBG

State
Street
Improvements
From
Woodrow
Wilson
to
Lakeland
Drive

Jackson

MS

CDBG

Renova3on
of
George
Washington
Carver
Library
for
Community
Center

Jackson

MS

CDBG

Jackson

MS

Jackson

MS

















6,950

















23,500















500,000


8












1,500,000


12














500,000


12












2,200,000


14














800,000


15

Street
Reconstruc3on
of
Mosley
Drive












1,300,000


15

CDBG

Westhaven
Road
Bridge
Replacement












1,000,000


15

CDBG

Meadowbrook
Road
Street
Improvements
From
State
Street
to
I‐55
Frontage
Road












2,500,000


16

City

State

Program

Jackson

MS

CDBG

Cedars
of
Lebanon
Bridge
Replacement

Project
Descrip3on

Funding
Required 










1,500,000


Jobs 18

Jackson

MS

CDBG

Jackson

MS

CDBG

Renova3on
of
Viola
Lake
House
for
Community
Center












1,000,000


18

Construc3on
of
infrastructure
improvements
for
Morehouse
Street
Project












1,000,000


Jackson

MS

CDBG

Design
and
construc3on
of
Historic
Garden
in
the
Farish
Street
Historic
District

20














800,000


Jackson

MS

CDBG

20

Design
services
and
funding
for
infrastructure
improvements
for
Bon
Air
Housing
Development












1,000,000


Jackson

MS

20

CDBG

Morehouse
Street












1,800,000


Jackson

20

MS

CDBG

South
Street
Bridge












1,800,000


20

Jackson

MS

CDBG

Splash
Parks
(7)












3,500,000


20

Jackson

MS

CDBG

Boling
Street
Improvements












2,000,000


25

Jackson

MS

CDBG

Buddy
Bufs
Park
Improvements












5,000,000


25

Jackson

MS

CDBG

Design
and
construc3on
of
30
unit
condo
development
in
Farish
Street
Historic
District












3,400,000


25

Jackson

MS

CDBG

Manhafan
Street
Bridge
&
Street
Improvements
From
Meadowbrook
Road
to
Cedars
of
Lebanon












2,500,000


25

Jackson

MS

CDBG

Northside
Drive
From
Bailey
Avenue
to
I‐55
Frontage
Rd.












2,000,000


25

Jackson

MS

CDBG

Terry
Road
Street
Improvements
From
McDowell
Road
to
McCleur
Road












2,000,000


25

Jackson

MS

CDBG

Shaw
Road
Street
Improvements












1,600,000


26

Jackson

MS

CDBG

Capital
Street
Improvements
From
Ellis
Avenue
to
Galla3n
Street












3,500,000


28

Jackson

MS

CDBG

For3fica3on
Street
Improvements
From
Bailey
Avenue
to
Woodrow
Wilson












3,500,000


28

Jackson

MS

CDBG

Galla3n
Street
Improvements
From
Capital
Street
to
I‐20












3,500,000


28

Jackson

MS

CDBG

State
Street
Improvementst
From
Woodrow
Wilson
to
Northside
Drive












3,500,000


28

Jackson

MS

CDBG

Clinton
Blvd
Street
Improvements
From
I‐220
to
Clinton/Jackson
line












3,000,000


30

Jackson

MS

CDBG

Medgar
Evers
Street
Improvements
From
Woodrow
Wilson
to
Northside
Drive












3,000,000


30

Jackson

MS

CDBG












3,000,000


30

Jackson

MS

CDBG

Renova3ons
and
roof
repairs
for
5
community
centers:
Grove
Park
Community
Center,
Jayne
Ave.
Community
 Center,
Presiden3al
Hills
Community
Center,
Westside
Community
Center,
and
Champion
Community
Center Beasley
Road
Improvements
From
Watkins
Drive
to
I‐55
Frontage
Road












5,000,000


35

Jackson

MS

CDBG

West
Street
From
MeadowBrook/Hanging
Moss
Intersec3on
to
Lamar
Street












5,000,000


35

Jackson

MS

CDBG










10,000,000


55

Jackson

MS

CDBG

Natatoriums
(4)
with
Olympic
pools
 (year
round
use) White
Oak
Creek
From
Adkins
Blvd
to
Old
Canton
Road










10,000,000


60

Jackson

MS

Energy

New
asphalt
around
garage
















50,000


0

Jackson

MS

Energy

Addi3onal
staff
to
maintain
post
construc3on
strucrural
controls
















70,000


2

Jackson

MS

Energy

Golden
Key
Community
Center
Roof














150,000


2

Jackson

MS

Energy

In
house
storm
water
tes3ng
equipment
















25,000


2

Jackson

MS

Energy

Program
Management
















85,000


2

Jackson

MS

Energy

Storm
Flo
Screen
for
lifer
and
solids
removal
in
flood
prone
areas
















60,000


2

Jackson

MS

Energy

T.
L.
Community
Center
Roof














150,000


2

Jackson

MS

Energy

Tougaloo
Community
Center
Roof














250,000


2

Jackson

MS

Energy

Landfill
Scale
and
road
Development
















75,000


3

Jackson

MS

Energy

OB
Traps
cons3nous
24
hour
monitoring
of
storm
water
out
falls
















60,000


3

Jackson

MS

Energy

Open
Dumping
Surveillance
System
















75,000


3

Jackson

MS

Energy

Storm
Water
Monitoring
Equipment
















50,000


3

Jackson

MS

Energy

2
Equipment
and
Maintenance
Operators
















98,001


4

Jackson

MS

Energy

Berm
around
Facility
















50,000


4

Jackson

MS

Energy

Outside
storage
building
needs
new
hip
roof
and
replacement
of
structural
wood
















25,000


4

Jackson

MS

Energy

Public
Outreach
and
Educa3on
















75,000


4

Jackson

MS

Energy

Creek
Screening
and
Sampling
Inves3ga3ng
discharge














180,000


6

Jackson

MS

Energy

Needs
internal
building
structure
repairs














100,000


6

Jackson

MS

Energy

Josh
Halbert
Gardens
Improvements












1,000,000


7

Jackson

MS

Energy

509
Pearl
Street
Building
Improvements












1,000,000


10

Jackson

MS

Energy

City
Baseball
Fields
(48)
Ligh3ng
Improvements












1,000,000


10

Jackson

MS

Energy

Interstate
55
Alternate
Signal
Timing
Plans














200,000


10

Jackson

MS

Energy

Landfill
Redemp3on
(McDowell
Road)














500,000


10

Jackson

MS

Energy

New
asphalt
around
garage














125,000


10

Jackson

MS

Energy

Oil/Water

Separator














225,000


10

Jackson

MS

Energy

Rain
garden
construc3on
projects
around
roadway
ouzalls
and
public
buildings














200,000


10

Jackson

MS

Energy

Traffic
Signal
LED
Retrofit
and
Meter
Installa3on














300,000


10

Jackson

MS

Energy

UMC
Medical
Mall
Signal
Synchroniza3on
Plan














115,000


10

Jackson

MS

Energy

VA
Park
Ligh3ng
Improvements












2,000,000


10

Jackson

MS

Energy












5,500,000


12

Jackson

MS

Energy

JATRAN
Administra3ve
Building
 (LEEDS
compliant) Playground
safety
enhancements












2,700,000


14

Jackson

MS

Energy

Green
Recycling
and
Processing
Project
(Landfill
and
Streets)














120,000


15

Jackson

MS

Energy

Environmental
Recycling
and
Green
Distribu3on
Center












3,000,000


20

Jackson

MS

Energy

Impound
Lot/facility












4,000,000


20

Jackson

MS

Energy

Solar
Panels
for
all
community
centers
operated
by
the
City












1,000,000


20

Jackson

MS

Energy

Mynelle
Garden
Improvements












1,500,000


25

Jackson

MS

Energy

Baflefield
Park
Improvements












1,500,000


30

Jackson

MS

Energy

Landfill
Redemp3on
(Fes3val
Park
Construc3on)










10,000,000


30

Jackson

MS

Energy














650,000


35

Jackson

MS

Housing

North
State
Street
Pedestrian/ Bicycle/Signal
Improvements Construc3on
of
15
units
of
affordable
housing
in
Royal
Manor
Subdivision












1,875,000


12

Jackson

MS

Housing

Construc3on
of
20
units
of
affordable
housing
in
Logino
Subdivision












2,500,000


15

City

State

Program

Jackson

MS

Housing

Construc3on
of
40
single
family
affordable
housing
units
in
Bon
Air
Subdivision

Project
Descrip3on

Funding
Required 










4,000,000


Jobs 30

Jackson

MS

Housing

Jackson

MS

Housing

Property
acquis3on
and
construc3on
of
30
single
family
housing
units
in
Historic
Farish
Street
District












3,800,000


30

Property
acquis3on
and
construc3on
of
80
unit
mul3family
housing
in
Historic
Farish
Street
District












6,500,000


Jackson

MS

Public
Safety

Bearcat
Tac3cal
Armored
Vehicle














226,720


50

Jackson

MS

Public
Safety

Explosive
Ordinance
Disposal
Unit














356,500


Jackson

MS

Public
Safety

Fitness
Equipment/Renova3ons
for
Training
Academy
Weight
Room

Jackson

MS

Public
Safety

Four
Ladder
Trucks
(Fire
Department)

Jackson

MS

Public
Safety

Handheld
Laser
Radar
















41,690


Jackson

MS

Public
Safety

Mobile
Command
Unit
for
Jackson
Police
Department














400,000


Jackson

MS

Public
Safety

Think
Stream
Program

Jackson

MS

Public
Safety

50
Police
Cruisers












1,050,000


Jackson

MS

Public
Safety

60
Fire
Fighters
‐
Hiring
fire
fighters
to
reach
recommended
staffing












1,959,000


60

Jackson

MS

Public
Safety

Adding
to
COPS
Grants
to
hire
Police
Officers
to
reach
recommended
staffing












6,575,675


180

Jackson

MS

Schools












4,200,000


15

Jackson

MS

Schools












4,200,000


15

Jackson

MS

Streets/Roads

Murrah
High
School
‐
Replacement
of
26
year
old
hea3ng,
ven3la3on
and
air
condi3oning
system
(HVAC)
in
 order
to
improve
energy
efficiency
to
comply
with
Energy
Star
Ra3ng
and
to
improve
indoor
air
quality Provine
High
School
‐
Replacement
of
26
year
old
hea3ng,
ven3la3on
and
air
condi3oning
system
(HVAC)
in
 order
to
improve
energy
efficiency
to
comply
with
Energy
Star
Ra3ng
and
to
improve
indoor
air
quality. Lynch
Street
‐
Highway
18
Interchange












2,000,000


10

Jackson

MS

Streets/Roads

Robinson
Rd
Extension(Hwy
18‐McDowell)
resurfacing












2,000,000


10

Jackson

MS

Streets/Roads

South
Street
Railroad
Overpass












1,000,000


10

Jackson

MS

Streets/Roads

Capitol
Street
(Ellis
‐
Boling)
resurfacing












3,000,000


15

Jackson

MS

Streets/Roads

Bullard
Street
(Zoo
‐
Boling)
resurfacing












3,500,000


20

Jackson

MS

Streets/Roads

Hwy
18
&
Lynch
St
Reconstruc3on












2,000,000


25

Jackson

MS

Streets/Roads

Parking
Meter
Moderniza3on














320,000


25

Jackson

MS

Streets/Roads

Westhaven
Blvd
Bridge
Replacement














125,000


25

Jackson

MS

Streets/Roads










17,000,000


30

Jackson

MS

Streets/Roads

Jackson

MS

Streets/Roads

Lynch
St
Extension
Reconstruc3on
 (US
80
to
Hwy
18) Terry
Rd
&
Elton
Rd/Lakeshore
Dr Intersec3on
Improvements Galla3n
St
(McDowell‐Monument)
resurfacing

Jackson

MS

Streets/Roads

Jackson

MS

Jackson
















60,000
 










4,200,000















238,000
 17














300,000


35












9,500,000


40

For3fica3on
Street
U3lity
Reloca3on












8,000,000


45

Streets/Roads

Raymond
Rd(Terry‐West
Highland)resurfacing












9,500,000


45

MS

Streets/Roads












1,500,000


50

Jackson

MS

Streets/Roads

Siwell
Rd/McCleur
Rd
Intersec3on Improvements South
Street
Bridge
Replacement












1,000,000


50

Jackson

MS

Streets/Roads

South
Street
Underpass
Renova3ons














750,000


50

Jackson

MS

Streets/Roads

West
County
Line
Road
Phase
1B












8,000,000


50

Jackson

MS

Streets/Roads










12,000,000


55

Jackson

MS

Streets/Roads










12,500,000


55

Jackson

MS

Streets/Roads










12,500,000


70

Jackson

MS

Streets/Roads

McDowell
Road
(I‐55
‐
Highway
18)
 resurfacing South
State
Street
Railroad
Overpass
 Construc3on Lynch
Street
Improvements 
(JSU
‐
Highway
80) Mayes
Street
Reconstruc3on












7,000,000


75

Jackson

MS

Streets/Roads

Siwell
Rd
Phase
2












5,500,000


75

Jackson

MS

Streets/Roads










17,000,000


85

Jackson

MS

Streets/Roads

Lynch
Street
Improvements 
(Highway
80
‐
Highway
18) Low
Sufficiency
Bridges
(replacement)










28,000,000


120

Jackson

MS

Streets/Roads










25,000,000


125

Jackson

MS

Transit

West
Street
Reconstruc3on
(George
St to
Woodrow
Wilson
Ave) Security
cameras
for
buses














150,000


1

Jackson

MS

Transit

12
Demand
Response
Buses

Jackson

MS

Transit

18
Fixed
Route
Buses

Jackson

MS

Transit

Jackson

MS

Transit

Medgar
Evers
Blvd
Traffic
Signal
 Improvements Northside
Dr
Signal
Improvements

Jackson

MS

Transit

AVL
Bus
Tracking
System

Jackson

MS

Transit

Jackson

MS

Transit

Jackson

MS

Jackson














720,000


5












6,120,000


10














600,000


20














750,000


20












2,000,000


25

McDowell
Rd
Traffic
Signal
Improvements














550,000


25














450,000


30

Transit

CBD
Traffic
Signal
and
Curb
Ramp
 Moderniza3on Jatran
Shelter
Improvements














800,000


30

MS

Transit

Bailey
Ave
Traffic
Signal
Improvements














650,000


35

Jackson

MS

Transit

Beasley
Rd
Signal
Improvements














750,000


35

Jackson

MS

Transit














825,000


35

Jackson

MS

Transit












1,500,000


35

Jackson

MS

Transit

Fondren
Area
Improvements
Phase
2 Traffic
Signal
Moderniza3on Ridgewood
Rd
&
Old
Canton
Rd
Signal
 Improvements Terry
Rd
Corridor
ITS/Signal
Moderniza3on












1,500,000


35

Jackson

MS

Water

AMR
Installa3on
Commerical
Meter
Boxes
















20,000


2

Jackson

MS

Water

AMR
Installa3on
Man
Holes
















20,000


2

Jackson

MS

Water

Water
System
SCADA
control
upgrades














600,000


2

Jackson

MS

Water

AMR
Installa3on
Residen3al
Meter
Boxes
















40,000


4

Jackson

MS

Water

2"
&
4"
Water
Line
Improvement
(#7)












2,750,000


15

City

State

Program

Jackson

MS

Water

2"
&
4"
Water
Line
Improvements
(#8)

Project
Descrip3on

Funding
Required 










3,000,000


Jobs 15

Jackson

MS

Water

Jackson

MS

Water

Hardy
Creek
Interceptor(i‐55
‐
Reno
Drive)












5,000,000


20

Three
Mile
Interceptro
(CN
Railroad
‐
Terry
Rd)












4,000,000


Jackson

MS

20

Water

Elevated
Storage
Tanks












5,750,000


Jackson

23

MS

Water

Maddox
System
Booster
Sta3on












6,000,000


24

Jackson

MS

Water

Lynch
Creek
Interceptor
(Segment
D)












5,000,000


25

Jackson

MS

Water

Central
Business
District
Water
Improvements












6,570,000


26

Jackson

MS

Water

48"
Water
Transmission
Main
(#4)












8,500,000


45

Jackson

MS

Water

54"
Water
Transmission
Main
(#1)












8,500,000


45

Jackson

MS

Water

48"
Water
Transmission
Main
(#5)












9,000,000


50

Jackson

MS

Water

Lynch
Creek
Interceptor
(Segment
B)










15,000,000


85

Jackson

MS

Water

Old
Capitol
Green
Project










57,000,000


4000

Jonestown

MS

CDBG

Jonestown

MS

CDBG

Youth
employment
funding
to
support
summer
youth
employment
program
for
up
to
100
young
people
in
the
 Town
of
Jonestown Town
Hall‐Construc3on
of
New
Town
Hall
to
include
parking
and
ADA
accessibility

Jonestown

MS

CDBG

Construct
a
Municipal
Sports
Facility

Jonestown

MS

CDBG

Renova3ons
of
Granny
and
Lil
People
Castle
Daycare
Centers

Jonestown

MS

CDBG

Street
Improvements‐Overlay
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.

Jonestown

MS

CDBG

Redevelopment
of
Downtown
Main
Street
including
sidewalks
and
ligh3ng

Jonestown

MS

Housing

Construct
15
houses
for
first
3me
home
buyers

Jonestown

MS

Public
Safety

Mobile
data
terminals
in
(5)
Police
cars














100,000


2

Jonestown

MS

Public
Safety

Construc3on
of
Downtown
Police
Headquarters














250,000


10

Jonestown

MS

Schools
















50,000


5

Jonestown

MS

Schools














500,000


5

Jonestown

MS

Schools

Elementary
Classroom
Mobile
Laptop
Carts:
This
project
is
for
Implementa3on
of
mobile
laptop
carts
at
 Jonestown
Elementary
School Jonestown
Elementary
School
‐
purchase
and
install
Projectors
and
Smartboards.
Installs
new
teaching
tool
for
 classroom
Instruc3ons. Jonestown
Elementary
School
‐
Video
Surveillance
System
Installa3on

Jonestown

MS

Schools

New
Construc3on
of
Jonestown
Elementary
School
Math
and
Science
Wing

Jonestown

MS

Water

Jonestown

MS

Water

Laurel

MS

Laurel Laurel














200,000


5














250,000


12












1,500,000


20














200,000


20












2,500,000


24














600,000


25












1,350,000


30














150,000


5














300,000


20

Upgrade
exis3ng
water
lines
and
refurbish
water
tank












1,500,000


15

Resolve
Chronic
Flooding
Problems
including
stream
restora3on,
deten3on
and
storm
sewers












1,500,000


20

Energy

Upgrade
controls
and
electrical
systems
at
wastewater
treatment
plants
to
decrease
energy
consump3on












1,850,000


MS

Energy

Upgrade
controls
and
electrical
systems
at
water
treatment
plants
to
decrease
energy
consump3on














830,000


MS

Housing

Doorbells
















99,600


2

Laurel

MS

Housing

Exterior
Building
Repairs














100,000


3

Laurel

MS

Housing

Hea3ng














120,000


4

Laurel

MS

Housing

Sewer/Drainage
Line
Repair














600,000


4

Laurel

MS

Housing

Interior/Exterior
Renova3ons
at
Arco
Lane












1,200,000


15

Laurel

MS

Housing

Security
Officers
@
each
site














860,000


24

Laurel

MS

Schools

Jones
Middle
School
–
Restore
Floors,
replace
seats
in
auditorimu














200,000


15

Laurel

MS

Schools

Laurel
High
School
–
Replace
windows
for
energy
efficiency














800,000


15

Laurel

MS

Schools

Maddox
Alterna3ve
School
–
Modernize
Windows

for
energy
efficiency














500,000


15

Laurel

MS

Schools

Nora
Davis
Magnet
School
‐
Replace
windows
in
historical














150,000


15

Laurel

MS

Schools

Oak
Park
Elementary
School
–
Replace
Floors,
Renovate
Auditorium














250,000


25

Laurel

MS

Schools

Wisner
Building
–
Stabilize
Founda3on,
new
gym
floor,
replace
windows,
hea3ng/cooling/drainage












1,000,000


30

Laurel

MS

Streets/Roads

16th
Avenue
signal
upgrades
and
Integrated
Traffic
System
to
improve
traffic
flow
on
Highway
15












1,600,000


Laurel

MS

Streets/Roads












2,200,000


Laurel

MS

Streets/Roads

Central
Avenue
reconstruc3on
of
old
pedestrian
walkway
to
appropriate
roadway
standards
and
provide
 proper
signaliza3on Chan3lly
Street
Overpass
to
connect
East
and
West
Laurel
while
bypassing
local
street
conges3on

Laurel

MS

Streets/Roads

Fibh
Street
realignment
to
alleviate
traffic
conges3on
by
changing
a
3
lane
segment
to
a
5
lane
segment












1,200,000


Laurel

MS

Streets/Roads

Jackson
Street
Extension
to
reroute
traffic
flow
due
to
closing
of
Interstate
59
ramps












5,800,000


Laurel

MS

Streets/Roads

Presiden3al
Parkway
to
provide
East‐West
corridor
for
improved
traffic
opera3on,
capacity,
and
safety












7,000,000


Laurel

MS

Transit

Laurel

MS

Water

Establish
a
mass
transit
system
for
the
City
by
purchasing
5
buses,
providing
maintenance,
office
support,
and
 bus
stops Projects
to
address
Potable
Water
System
pressure
deficiencies
and
replace
aging
infrastructure












5,145,000


Laurel

MS

Water

Projects
to
address
Sanitary
Sewer
Overflows
and
replace
aging
infrastructure












6,806,000


Laurel

MS

Water

Water
wells,
water
tank
and
waterlines
to
improve
water
supply
to
industry
and
the
hospital












3,800,000


60

Louise

MS

Streets/Roads

STREET
OVERLAY
AND
STORM
DRAINAGE














850,000


25

Meadville

MS

Streets/Roads

Repair/overlay
streets
following
sewer
and
water
upgrades
plus
other
needed
street
repair/overlay












2,500,000


10

Meadville

MS

Water

Upgrade
exis3ng
sewer
lines
installed
from
1949
through
the
next
twenty/twenty‐five
years












5,000,000


10

Meadville

MS

Water

Upgrade
exis3ng
water
lines
and
refurbish
water
tanks












5,000,000


10

Meridian

MS

Airport

Construct
hangar
access
road














750,000


36

Meridian

MS

Airport

Drainage
improvements‐‐maintenance,
wildlife












2,000,000


60

Meridian

MS

Airport

Complete
Taxiway
"A"
reloca3on










10,000,000


89

Meridian

MS

Airport

Extension
of
Taxiway
"A"
reloca3on












3,500,000


89

Meridian

MS

CDBG

Demoli3on‐‐Doughboy
Monument
surroundings
















10,000


0

Meridian

MS

CDBG

Demoli3on‐‐lease
spaces
in
parking
garage
















50,000


2

Meridian

MS

CDBG

Demoli3on‐‐Ragsdale
Block
86
for
new
PD














150,000


4

Meridian

MS

CDBG

Demoli3on‐‐Trustmark
Bank
&
srroundings














150,000


4

Meridian

MS

CDBG

Demoli3on‐‐6th,
7th
sts.
from
22nd
to
25th
aves.














180,000


5

Meridian

MS

CDBG

Downtown
storm
water
management
system














150,000


10

Meridian

MS

CDBG

Demoli3on‐‐old
parking
garage














550,000


14










18,500,000















832,769


17

City

State

Program

Meridian

MS

CDBG

Carnegie
Library
restora3on

Project
Descrip3on

Funding
Required 










2,500,000


Jobs 20

Meridian

MS

CDBG

Meridian

MS

CDBG

Traffic
light
repair/replacement
for
fuel
efficiency












1,000,000


25

22nd
Ave.
Overpass
renova3ons












1,000,000


Meridian

MS

30

CDBG

26th
Ave.
subway
renova3ons












3,000,000


Meridian

50

MS

CDBG

Hospital
District
implementa3on












3,000,000


60

Meridian

MS

CDBG

Redline
Community
drainage
project














500,000


75

Meridian

MS

CDBG

Kress
Building
new
museum
and
exhibits










26,000,000


85

Meridian

MS

CDBG

City
Hall
Green












7,000,000


100

Meridian

MS

CDBG

Sewage
treatment
plant
for
east
Meridian










10,000,000


125

Meridian

MS

Energy

Solar
power
systems
at
3
fire
sta3ons

Meridian

MS

Energy

Meridian

MS

Meridian

MS

Meridian














450,000


0

Energy
retrofit
City
Hall












1,000,000


15

Energy

Energy
retrofit
Threefoot
building












1,000,000


15

Energy

Recycling
facility














750,000


20

MS

Energy

Energy
retrofit
35
public
buildings














600,000


50

Meridian

MS

Housing

Construct
gazebo
for
senior
ci3zens
















15,000


5

Meridian

MS

Housing

Reconfigure
community
center
for
police
precinct
















10,000


5

Meridian

MS

Housing

Repair
buckling
sidewalks
throughout
sites
















20,000


5

Meridian

MS

Housing

Repair
playground
equipment
for
safety
















20,000


5

Meridian

MS

Housing

Replace
security
doors
at
senior
sites
for
safety
















25,000


5

Meridian

MS

Housing

Reconfigure
central
maintenance
facility
















30,000


6

Meridian

MS

Housing

Erosion,
sink
hole
repairs
throughout
sites
















50,000


10

Meridian

MS

Housing

Pot
hole
repair,
street
resurfacing
















55,000


10

Meridian

MS

Housing

Property
entrance
signs
with
landscaping
















30,000


10

Meridian

MS

Housing

Security
ligh3ng
throughout
9
sites
















85,000


10

Meridian

MS

Housing

Public
housing
renova3ons
and
repairs—all
sites














245,000


15

Meridian

MS

Public
Safety

Mobile
data
terminals
in
50
patrol
vehicles














500,000


0

Meridian

MS

Public
Safety

8
new
officers
through
COPS
for
drug/gang
detail














296,000


8

Meridian

MS

Streets/Roads

Repair
retaining
wall
for
33rd
Ave.












1,000,000


25

Meridian

MS

Streets/Roads

Replace
31st
Ave.
bridge
over
Sowashee
Creek












4,000,000


30

Meridian

MS

Streets/Roads

Industrial
road
from
I‐20/59
to
Hwy.
80










10,000,000


45

Meridian

MS

Streets/Roads

North
Hills
St.
widening












5,000,000


45

Meridian

MS

Streets/Roads

Street
drainage
rehab
downtown












5,000,000


60

Meridian

MS

Streets/Roads

Industrial
road
from
I‐20/59
to
Hwy.
19










16,000,000


75

Meridian

MS

Streets/Roads

Street
overlay










15,000,000


100

Meridian

MS

Streets/Roads

Street
resurfacing










15,000,000


100

Meridian

MS

Water

Valve
truck
and
crew
for
valve
maintenance














151,653


2

Meridian

MS

Water

Back‐up
generator
at
water
plant














750,000


8

Meridian

MS

Water

Rehab
work
at
water
plant












2,000,000


15

Meridian

MS

Water

2
new
water
wells












3,000,000


20

Meridian

MS

Water

Replace
water
lines












1,000,000


20

Meridian

MS

Water

Addi3onal
treatment
at
water
plant












1,000,000


25

Meridian

MS

Water

Rehab
work
at
wastewater
treatment
plant












4,000,000


25

Meridian

MS

Water

Lines
rehab
in
waste
water












2,000,000


30

Meridian

MS

Water

Repair
Long
Creek
dam












3,000,000


35

Meridian

MS

Water

wastewater
plant
rehab












5,000,000


50

Meridian

MS

Water

lines
rehab‐‐freshwater












2,000,000


75

Meridian

MS

Water

Lines
rehab‐‐wastewater












3,000,000


75

Meridian

MS

Water

Water
lines
to
annexed
area












5,000,000


80

Meridian

MS

Water

Sewer
to
annexed
area












7,000,000


90

Merigold

MS

CDBG

Drainage
improvements
‐
Dredge
and
clean
out
town
drainage
ditch
to
include
excava3on
and
rip
rap.














375,000


10

Merigold

MS

CDBG

Water
and
sewer
facili3es
‐
Replacement
of
water
distribu3on
and
sewer
collec3on
lines
throughout
the
town.














750,000


18

Merigold

MS

Schools














550,000


14

Morgan
City

MS

CDBG

Hayes
Cooper
School
‐
Renova3on
of
building,
HVAC
improvements,
electrical
and
plumbing,
and
 moderniza3on
of
informa3on
technology
systems. Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility.














250,000


12

Morgan
City

MS

CDBG

Street
Improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.














850,000


17

Morgan
City

MS

CDBG












1,250,000


20

Mound
Bayou

MS

CDBG

Water
and
Sewer
Improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 and
treatment
system
for
en3re
town. Town
Hall
‐
Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility.














450,000


12

Mound
Bayou

MS

CDBG

Elderly
Health
Care
‐
Renova3on
of
exis3ng
health
care
facility
to
include
parking
and
ADA
accessibility.

Mound
Bayou Mound
Bayou

MS MS

CDBG CDBG

Health
Center
‐
Renova3on
of
exis3ng
Health
Center
to
include
parking
and
ADA
accessibility. Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system














600,000
 










1,800,000


18 20












9,800,000


32

Mound
Bayou

MS

CDBG










10,000,000


38

Mound
Bayou

MS

Schools

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
collec3on
and
treatment
 system
for
en3re
town. Public
School
moderniza3on
‐
Renova3on,
repairs,
and
addi3on
of
ADA
accessibility
to
exis3ng
public
school.












3,700,000


28

Natchez

MS

CDBG








600,000,000


65

Natchez

MS

CDBG










11,752,535


75

Forks
of
the
Road
Heritage
Trail.

This
project
would
greatly
enhance
one
of
the
primary
gateways
to
our
city
by
 crea3ng
an
African
American/Ethnic
Heritage
Trail
along
a
stretch
of
St.
Catherine
Street
between
the
Forks
of
 the
Road
Slave
Market
Site
 Marblestone
Neighborhood
Reconstruc3on
Project.

This
neighborhood,
located
in
a
severely
economically
 depressed
area
of
the
city,
experiences
flooding
due
to
inadequate
drainage
and
limited
emergency
and
 commercial
access
due
to
remarkably
narrow
street

City

State

Program

Natchez

MS

CDBG

Natchez

MS

CDBG

Natchez

MS

CDBG

Natchez

MS

CDBG

Natchez

MS

CDBG

Natchez

MS

CDBG

Natchez

MS

Housing

Natchez

MS

Public
Safety

Natchez

MS

Transit

Natchez

MS

Water

Oakland

MS

CDBG

Oakland

MS

CDBG

West
S3ers
Neighborhood
Reconstruc3on
Project.
This
network
of
streets
in
a
severely
economically
depressed
 area
of
the
city,
must
be
widened
to
increase
neighborhood
commerce
and
meet
general
safety
standards.
 Jobs
created
are
+
or
‐
50
or
so
according Margaret
Mar3n
Center
for
the
Arts
renova3ons.

We
plan
to
renovate
an
underu3lized
former
school
building
 for
use
as
a
comprehensive
performing
and
visual
arts
center.
It
will
enhance
our
areas
exis3ng
tourism
 economy
and
will
provide
short
and
long Phase
I‐‐Neighborhoods
First
Program.

A
comprehensive
revitaliza3on
program
structured
to
bring
economic
 development
to
economically
depressed
areas
of
the
city,
especially
to
underserved
popula3ons.

This
phase
 would
include
infrastructure
improvement Mississippi
River
Corpora3on
Water
Project.

This
project
would
provide
an
addi3onal
municipal
water
tower
 to
Mississippi
River
Corpora3on
and
would
allow
that
corpora3on
to
greatly
expand
opera3ons
and
hire
more
 staff
longterm. North
Natchez
Comprehensive
Drainage
Project.

A
much
needed
project
to
prevent
ongoing
erosion
in
the
 economically
depressed
minority
areas
of
North
Natchez.

This
project
will
include
widening
of
exis3ng
streets
 for
emergency
vehicle
access Parks
and
Recrea3on
Improvement
Project.

This
project
will
allow
for
maximum
economic
development
 impact
by
crea3ng
a
sports
complex
which
would
allow
our
city
to
host
major
regional
and
na3onal
sports
 tournaments Modernizing
and
Repair
of
Natchez
Housing
Authority
low
income
housing.

These
funds
would
be
used
to
 modernize
and
repair
roofs,
kitchens,
and
outdoor
staircases
on
several
low
income
housing
proper3es‐‐ specifically
Maryland
Heights,
Ram
Circle Technology
Infrastructure
Improvements
Project‐‐Police,
Fire,
and
First
Responders.

This
much
needed
project
 would
bring
our
public
safety
departments
up
to
speed
with
their
computer
equipment
and
network. Natchez
Transit
Facility
Improvements
Project.

This
project
would
allow
us
to
create
a
new,
modern
public
 transit
facility
to
centralize
our
exisi3ng
transit
services.

Crea3on
of
this
facility
would
make
opera3ons
of
our
 transit
system
more
economical Water
and
Wastewater
Infrastructure
Improvement
Project.

This
project
would
thoroughly
modernize
our
 exis3ng
water
and
wastewater
system,
providing
source
water
protec3on
and
a
higher
standard
of
public
 safety
with
regard
to
city
water
and
sewer. Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk
 network. Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility.

Project
Descrip3on

Oakland

MS

CDBG

Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.

Oakland

MS

CDBG

Pace

MS

CDBG

Pace

MS

CDBG

Water
and
sewer
improvements
‐
Extension
of
water
and
sewer
system
to
unserved
areas
of
town,
and
repair
 and
replacement
of
exis3ng
water
and
sewer
system. Construct
Maintenance
Building
and
Fire
Sta3on
to
house
Town
equipment
preven3ng
theb
and
malicious
 damages Renovate
en3re
Town
water
and
sewer
system

Pace

MS

CDBG

Renova3on
of
exis3ng
Town
Hall
to
include
parking
and
ADA
accessibility














450,000


5

Pace

MS

CDBG

Renovate
and
reconstruct
school
building
into
a
Mul3‐purpose
Center
to
address
needs
of
ci3zens














800,000


10

Pace

MS

Housing

Construct
five
houses
for
first
3me
home
buyers














450,000


5

Pace

MS

Streets/Roads

Street
improvement
of
en3re
Town
to
include
overlay,
curb,
gufer
and
drainage














350,000


5

Petal

MS

Streets/Roads














165,000


15

Petal

MS

Streets/Roads
















85,000


15

Petal

MS

Streets/Roads














370,000


30

Petal

MS

Streets/Roads














475,000


35

Petal

MS

Streets/Roads














485,000


35

Petal

MS

Streets/Roads














305,000


45

Petal

MS

Water

Cochran
and
7th
Street
Drainage‐
This
project
consists
of
installa3on
of
roughly
900’
of
29”x18”
reinforced
 concrete
pipe
to
replace
an
undersized
pipe
and
increase
capabili3es
to
relieve
stormwater
through
an
exis3ng
 ditch.

 Herrington
Road
Signal‐
The
City
opened
bids
on
9‐10‐07
and
the
project
was
never
awarded
due
to
lack
of
 funds.

This
project
was
to
help
traffic
movements
and
safety
for
the
new
school. 8th
Ave
Curb
and
Gufer‐
This
project
involves
replacing
a
watermain,
stormwater
collec3on
system,
curb
and
 gufer,
and
widening
the
roadway. Highland
Circle
Drainage‐
The
project
consists
of
the
installa3on
of
various
size
corrugated
plas3c
pipe,
 reinforced
concrete
pipe,
and
yard
inlets.

This
project
is
designed
to
eliminate
severe
drainage
problems
that
 have
resulted
in
erosion
and
sedime Hwy
42
@
Cameron
Road
Drainage‐
Petal
has
sought
funding
through
FHWA
because
during
Hurricane
Gustav
 Petal
experienced
flooding
which
has
jeopardize
the
roadbed
on
this
federal
route.

This
project
replaces
 exis3ng
undersized
culverts
 Tyner
Drive
Extension‐
This
project
is
currently
on
hold
due
to
the
econamic
downturn.

The
purpose
of
this
 project
is
to
provide
an
access
road
to
Lowes
of
Petal.

The
development
of
the
new
Lowes
store
in
Petal
 represents
a
significant
investment
 Highway
11
Watermain‐
This
project
provides
fire
lines
for
the
annexed
area
along
Highway
11.














350,000


20

Petal

MS

Water














560,000


20

Petal

MS

Water














890,000


25

Petal

MS

Water














690,000


25

Petal

MS

Water














980,000


25

Petal

MS

Water














400,000


25

Petal

MS

Water












1,000,000


35

Rosedale

MS

CDBG












2,500,000


24

Rosedale

MS

CDBG












3,000,000


26

Sidon

MS

CDBG














650,000


12

Lib
Sta3on
Rehabilita3on‐
This
project
is
designed
and
approved
by
the
Mississippi
Department
of
 Environmental
Quality.
This
project
will
rehabilitate
5
different
lib
sta3ons
acquired
by
the
purchase
of
Camco
 U3li3es. Autumn
Ridge
Sewer
Expansion‐
This
project
provides
sewer
service
for
the
Autumn
Ridge
subdivision
that
was
 annexed
by
the
City
of
Petal
approximately
six
years
ago. Hwy
11
Sewer
Expansion‐
This
project
provides
sewer
service
for
the
newly
annexed
areas
along
Highway
11. Sunrise
Road
Sewer
Extension‐
This
project
consists
of
the
installa3on
of
one
(1)
lib
sta3on
and
2,500
L.F.
of
 gravity
sewer.
This
project
will
serve
the
Sunrise
Road
area
and
accept
wastewater
from
Pecan
Lakes
U3li3es
 which
is
currently
being
discha Water
Plant
"C"
Aera3on‐
This
project
consists
of
the
installa3on
of
an
aerator
with
appurtenances
to
remove
 contaminates
from
the
drinking
water. Sewer
Rehabilita3on‐
There
is
s3ll
roughly
35,000
linear
feet
of
concrete
lines
in
the
City
of
Petal
that
were
not
 rehabilitated
in
the
last
CIPP
project.
The
City
bid
this
work
in
conjunc3on
with
the
awarded
project
as
an
 alternate
but
was
unable
to
f Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system. Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 and
treatment
system
for
en3re
town. Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 system
for
en3re
town.

Funding
Required

Jobs










26,581,320


100












5,000,000


180










12,000,000


200














300,000


300












7,000,000


300












9,500,000


350














924,757


50
















90,000


20














700,000


90












4,000,000


300














100,000


6














250,000


12












1,000,000


18












1,500,000


22














600,000


5














450,000


5

City

State

Program

Sidon

MS

CDBG

Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.

Project
Descrip3on

Sidon

MS

CDBG

Sumner

MS

CDBG

Sumner

MS

CDBG

Terry

MS

CDBG

Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
administra3ve
offices,
community
mee3ng
area,
parking,
 and
ADA
accessibility. Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk
 network,
including
addi3onal
landscaping
and
street
furniture. Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 system,
including
sewer
pump
sta3ons,
for
en3re
town. Construct
Library
(4,010
s.f.)

Terry

MS

Energy

Terry

MS

Streets/Roads

Terry

MS

Terry

Funding
Required 












750,000


Jobs 15














325,000


15














150,000


10














650,000


15














328,000


7.3

Rehabilita3on
of
Downtown
Facades
(including
awnings
for
Energy
savings)














520,000


11.5

Rehabilita3on
of
Cunningham
Avenue














100,000


2

Streets/Roads

Sidewalk
Replacement
(Downtown
Area)














230,000


5

MS

Streets/Roads

Street
Rehabilita3on
(Overlay
All
Streets
East
of
Interstate
Route
55)












1,171,000


26

Terry

MS

Water














552,000


11.6

Terry

MS

Water














690,000


15.3

Terry

MS

Water

Sewer
System
Rehabilita3on
‐

Cunningham
Ave.
(Interstate
Route
55
to
Railroad
Ave.); U3ca
Street
(Beasley
Street
to
Sewer
Lagoon) Water
System
Rehabilita3on
Cunningham
Ave
(Interstate
Route
55
to
Railroad
Ave.);
 U3ca
Street
(Beasley
St.
to
Sewage
Lagoon) Install
New
Water
Service
(annexed
area
along
Interstate
Route
55)














700,000


15.5

Terry

MS

Water

Upgrade
Sewage
Treatment
Facility












1,000,000


22

Terry

MS

Water

Install
New
Sewer
Service
(inside
exis3ng
corporate
limits)












1,570,000


35

Terry

MS

Water

Install
New
Sewer
Service
(annexed
area
along
Interstate
Route
55)












2,450,000


54

Tutwiler

MS

CDBG














125,000


12

Tutwiler

MS

CDBG

Tutwiler

MS

CDBG

Pedestrian
improvements
‐
ADA
accessibility
improvements,
repair,
and
reconstruc3on
of
town
sidewalk
 network. Water
and
sewer
improvements
‐
Extension
of
water
distribu3on
and
sewer
collec3on
to
unserved
areas
of
 town. Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.

Webb

MS

CDBG

Webb

MS

CDBG

Webb

MS

CDBG

Webb

MS

CDBG

Wesson

MS

Wesson














575,000


20












1,500,000


25

Town
Hall
‐
Construc3on
of
new
Town
Hall
to
include
parking
and
ADA
accessibility.














250,000


12

Water
and
sewer
improvements
‐
Extension
of
town
water
distribu3on
and
sewer
collec3on
system
to
adjacent
 rural
water
district. Street
improvements
‐
Overlay,
par3al
curb
and
gufer,
and
storm
drainage
for
en3re
town
street
system.














675,000


15














850,000


20












2,100,000


24

CDBG

Water
and
sewer
improvements
‐
Renova3on
and
replacement
of
water
distribu3on
and
wastewater
collec3on
 system
for
en3re
town. Sidewalk
repairs
and
extensions














426,000


15

MS

CDBG

Development
of
a
recrea3onal
park
for
general
public
use














856,000


20

Wesson

MS

CDBG

Reloca3on
of
u3lity
services
to
be
placed
underground












2,500,000


20

Wesson

MS

CDBG

Development
of
a
Municipal
Complex
for
general
government
use,
public
library,
and
community
center












1,840,000


25

Wesson

MS

Streets/Roads

Road
Resurfacing
and
Rehabilita3on
throughout
the
municipality














923,000


15

Wesson

MS

Water

Wastewater
system
repairs
and
extensions
throughout
the
municipality












1,500,000


15

Wesson

MS

Water

Water
system
repairs
and
extensions
throughout
the
municipality












1,260,000


15

Yazoo
City

MS

CDBG

Cemetery
Barn
for
equipment
















90,000


4

Yazoo
City

MS

CDBG

15th
Street
stormdrainage














650,000


5

Yazoo
City

MS

CDBG

Oakes
Museum
Improvements














200,000


6

Yazoo
City

MS

CDBG

Rubbis
Pit
Class
1















650,000


15

Yazoo
City

MS

CDBG

Triangle
Cultural
Center
Point
tuck
exterior
brick














300,000


15

Yazoo
City

MS

CDBG

Drainage
Improvements












1,000,000


20

Yazoo
City

MS

CDBG

6th
Street
Stormwater
Pumpsta3on
and
forcemain












2,000,000


25

Yazoo
City

MS

Public
Safety

Fire
Figh3ng
Equipment

Yazoo
City

MS

Public
Safety

Fire
vehicles
(4)

Yazoo
City

MS

Public
Safety

Class
A
Pumper
&
75
b
ladder
Truck












1,000,000


2

Yazoo
City

MS

Public
Safety

Police
Evidence
Management
System
















16,000


2

Yazoo
City

MS

Public
Safety

Trainning/Garage
for
Fire
Department














300,000


2

Yazoo
City

MS

Public
Safety

4
Points
Fire
Sta3on














750,000


4

Yazoo
City

MS

Public
Safety

Fire
Sta3on
Number
3














750,000


4

Yazoo
City

MS

Public
Safety

Police
Computers

















6,000


4

Yazoo
City

MS

Public
Safety

Police
Patrol
Cars
(8)














100,000


4

Yazoo
City

MS

Public
Safety

Bullet
Proof
vests
(30)
















90,000


5

Yazoo
City

MS

Public
Safety

Addi3onal
Police
Officers
(8)














224,000


8

Yazoo
City

MS

Public
Safety

Downtown
Fire
Sta3on












1,500,000


9

Yazoo
City

MS

Schools

Buses
(4)
and
one
van














550,000


4

Yazoo
City

MS

Schools

Storage
Buildings
















25,000


10

Yazoo
City

MS

Schools

Upgrade
Electrical
and
Boiler
System














400,000


15

Yazoo
City

MS

Schools

Rehab
Auditorium
at
Alterna3ve
School
















75,000


20

Yazoo
City

MS

Schools

Increase
techological
communica3ons














500,000


25

Yazoo
City

MS

Schools

Rehabita3on
of
Yazoo
City
Junior
High
School












3,000,000


100

Yazoo
City

MS

Schools

Crea3on
of
new
wing
at
McCoy
Elementary












5,000,000


150

Yazoo
City

MS

Schools

Sports
Complex/Athle3c
Field
House












1,500,000


150

Yazoo
City

MS

Schools

Upgrade
exis3ng
Central
Office
Facili3es
and
create
Professional
Development
Center












2,500,000


150

Yazoo
City

MS

Schools

Upgrade
Webster
Elementary

Yazoo
City Yazoo
City

MS MS

Streets/Roads Streets/Roads

Grand‐Gordon
Connector
Road Street
Improvements












5,000,000
 










6,000,000


150 50












4,300,000


50

Yazoo
City

MS

Water

Blue
Moon
Water
&
Sewer
improvements

Yazoo
City

MS

Water

Yazoo
City

MS

Water
















30,000
 














80,000

















60,000


4

Water
Improvements












3,000,000


25

Sewer
Improvements












7,000,000


40

City

State

Program

Bozeman

MT

Energy

Bozeman

MT

Energy

Bozeman

MT

Public
Safety

Water
Reclama3on
Plant
($64
million
contract
to
be
par3ally
awarded
November
2008)
–
methane
recovery
 system/digester
gas
engine. Water
Reclama3on
Plant
$64
million
contract
to
be
par3ally
(because
of
lack
of
funding)
awarded
November
 2008

–
LEED
cer3fied
laboratory
&
administra3on
building. Op3com
system
traffic
preemp3on

Project
Descrip3on

Funding
Required

Jobs

Bozeman

MT

Public
Safety

Fire
engine
3
–
sta3on
three
is
under‐construc3on
with
a
comple3on
date
of
June
2009

Bozeman

MT

Public
Safety

Design
police
sta3on
and
municipal
court.

Bozeman

MT

Water

Lincoln
sewer
main












1,100,000


6

Bozeman

MT

Water

Pilot
membrane
tes3ng
for
a
new
Water
Plant.












1,200,000


8

Darby

MT

Public
Safety

wastewater
lagoon
to
protect
head
waters
of
the
Biferroot/colombia
river
system












5,500,000


10

Darby

MT

Water

Water
main
extension
and
water
main
replacement.
replacement
of
ageing
water
tank.














3,675,000


10

Missoula

MT

CDBG

City
Shops
Upgrades;
community
services;
energy
efficiencies












1,000,000


17

Missoula

MT

CDBG












4,500,000


77

Missoula

MT

Energy














600,000


14

Missoula

MT

Energy












1,500,000


30

Missoula

MT

Energy












2,000,000


34

Missoula

MT

Energy










20,500,000


341

Missoula

MT

Public
Safety

Downtown
Redevelopment
and
Parks,
Silver
Park,
14‐acre
inner
city
park
with
cri3cal
trail
connec3ons,
public
 boat
ramp
and
reconstruc3on
of
rail
trestle
providing
access
to
park;inner
city
recrea3on;
complete
trail
 connec3ons;
rail/street
safe Replace
3
Community
Playgrounds;
kids,
health,
promote
environmental
stewardship;
improve
safety
for
 children;
u3lize
green
materials
and
equipment Replace
15
Neighborhood
Playgrounds
2009,
spring;
kids,
health,
promote
environmental
stewardship;
 improve
safety
for
children;
u3lize
green
materials
and
equipment;
local
area
benefit
$100,000
each Playfair
Park
infrastructure
expansion
&
replacement,
60‐acre
park;
kids,
health,
promote
environmental
 stewardship;
reforesta3on;
LEED
cer3fied
irriga3on
system;
upgrade
exis3ng
park
environment;
regional
area
 benefit Parks,
Development,
82
acre
Fort
Missoula
Regional
Park;
expand
large
park
environment;
kids,
health,
 promote
environmental
stewardship;
reforesta3on;
LEED
cer3fied
irriga3on
system;
Historic
interpreta3on;
 Tourism
and
regional
area
benefit City/County
Facili3es,
Downtown
Redevelopment Downtown
Police
Headquarters
and
County
Administra3ve
Building










36,000,000


577

Missoula

MT

Streets/Roads

Raflesnake
Gateway
Greenough;
safety;
pedestrian
improvements














200,000


4

Missoula

MT

Streets/Roads

Hillview
Way
Reconstruc3on;
safety;
drainage












3,500,000


5

Missoula

MT

Streets/Roads

Reserve/Mullan
Intersec3on;
safety;
traffic
capacity;
conges3on
mi3ga3on














300,000


6

Missoula

MT

Streets/Roads

Traffic
Signal
LED
Upgrades;
citywide
energy
efficiency;
citywide
fuel
use
reduc3on














600,000


11

Missoula

MT

Streets/Roads

Traffic
Signal
Op3miza3on;
traffic
opera3ons;
energy
savings;
conges3on
mi3ga3on














800,000


14

Missoula

MT

Streets/Roads

Higgins/Beckwith
Roundabout;
urban
renewal;
traffic
safety;
conges3on
mi3ga3on














900,000


15

Missoula

MT

Streets/Roads

Community
Sidewalks;
safety,
pedestrian
improvements












1,000,000


17

Missoula

MT

Streets/Roads












1,500,000


27

Missoula

MT

Streets/Roads

North
Higgins
Streetscape,
Phase
I;
general
benefit;
conges3on
mi3ga3on;
improved
traffic
flow;
urban
 renewal;
parking;
non‐motorized
traffic
safety
and
infrastructure
enhancements Scof
Street
Overpass
Reconstruc3on;
traffic
safety;
maintenance












1,900,000


31

Missoula

MT

Streets/Roads

Miller
Creek
Road,
Briggs
to
"Y";
safety;
traffic
capacity;
conges3on
mi3ga3on












2,000,000


33

Missoula

MT

Streets/Roads












2,000,000


34

Missoula

MT

Streets/Roads












4,000,000


67

Missoula

MT

Streets/Roads










50,000,000


806

Missoula

MT

Water

Front
and
Main
Streets,
Convert
to
Two‐Way
Traffic;
improved
traffic
flow;
conges3on
mi3ga3on;
general
 benefit Higgins
Streetscape,
Length
Of
Higgins
Street
From
Alder
To
Brooks
Streets
(complete
project);
general
benefit;
 conges3on
mi3ga3on;
improved
traffic
flow;
urban
renewal;
non‐motorized
traffic
safety
&

infrastructure
 enhancements Rails‐to‐Trails
Conservancy
(RTC)
2010
Campaign;
provide
alterna3ve
transporta3on;
traffic
and
conges3on
 mi3ga3on;
enhance
air
quality §
improve
physical
health;
improve
social
fabric;
less
expense
to
maintain
than
roads;
outdoor
ac3vity Levee
Maintenance,
flood
protec3on

Missoula

MT

Water

Sewer
Libsta3on
Reconstruc3on;
maintenance;
ground
water
protec3on

Missoula

MT

Water

Missoula

MT

Water

Missoula

MT

Missoula












1,000,000


3












3,177,000


8














170,000


2














450,000


3












2,250,000


4














300,000


6














800,000


14

Grant
Creek
Flood
Control,
Debris
Removal
§
flood
protec3on












1,000,000


17

Storm
Drain
Reconstruc3on
§
flood
protec3on












1,000,000


17

Water

Wastewater
Treatment
Plant
Odor
Control
§
nuisance
reduc3on












2,500,000


41

MT

Water

Airport
Sewer
Interceptor
system
capacity,
ground
water
protec3on












2,500,000


42

Missoula

MT

Water












5,000,000


82

Missoula

MT

Water












6,700,000


108

Shelby

MT

Airport

Clark
Fork
Riverbank
Restora3on,
Downtown
Redevelopment.
Both
river
banks
in
core
downtown
area,
Orange
 to
Russell
Streets.
Requires
Corp
of
Engineers
involvement. (2008
failed
funding
process Wastewater
Treatment
Plant
Headworks‐
DEQ
treatment
permit
requirement
§
enhanced
treatment
process
 improvements Runway
Extension










15,000,000


60

Shelby

MT

Amtrak

Amtrak
Depot
Improvements















200,000


10

Shelby

MT

CDBG

Civic
Center
Energy
Retrofit












1,000,000


15

Shelby

MT

CDBG

Storm
Drainage












5,000,000


30

Shelby

MT

Energy

Biolubricants
Plant
Infrastructure










10,000,000


200

Shelby

MT

Housing

Rural
Rental
Housing
Improvements

Shelby

MT

Schools

Historic
Shelby
High
School
Distant
Learning
Center
Development


Shelby

MT

Streets/Roads

Quite
Zone
Construc3on

Shelby

MT

Streets/Roads

Shelby

MT

Shelby














300,000


15












5,000,000


50














400,000


10

City
Street
Paving












4,000,000


20

Streets/Roads

Shelby
Interchange












7,000,000


20

MT

Streets/Roads

South
Front
Street
Paving












2,000,000


20

Shelby

MT

Streets/Roads

Viaduct
Can3lever
Walkway














750,000


20

Shelby

MT

Streets/Roads

Viaduct
Construc3on












4,000,000


20

Shelby

MT

Transit

Transit
HUB
Facility












1,000,000


6

Shelby

MT

Transit

Energy
Park
Rail
Infrastructure












4,000,000


40

City

State

Program

Shelby

MT

Water

Wastewater
Ouzlow
Project

Project
Descrip3on

Funding
Required 










1,500,000


Jobs

Shelby

MT

Water

Water
Well
Field
Improvements












2,500,000


20

Shelby

MT

Water

Water
Line
Rehabilita3on













3,000,000


25

Shelby

MT

Water

Sewage
Treatment
Expansion













6,000,000


30

Shelby

MT

Water

West
End
12‐Inch
Water
Line
Interceptor
Project












3,500,000


30

Asheville

NC

CDBG

Upgrade
parks
to
become
ADA
assessible













1,700,000


24

Asheville

NC

Streets/Roads

Beaverdam
Road
sidewalk

Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Asheville Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Charlofe Concord Concord Concord

NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC NC

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Water Water Water Water Water Water Water Energy Energy Energy Energy Energy Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit Transit Transit Transit Transit Transit Transit Water Water Water Water Water Water Water Water Water Water Water Water Water Airport Airport Airport

Traffic
Signal
at
Charlofe
and
Edwin
Place Traffic
Signal
Upgrade
at
Charlofe
and
Chestnut
 McDowell
Street
sidewalk Complete
Wayfinding
Project Hendersonville
Road
sidewalk installa3on
of
bus
stops Bike
racks Bike
Lockers Replacement
buses Black
Mountain
Pumping
Sta3on Mills
River
Pumping
Sta3on North
Fork
High
Pressure
Pumping
Sta3on Walnut
Cove
Pumping
Sta3on Brian
and
Burton
Street
drainage/Roadway Old
Toll
Road
Drainange/Roadway Victoria
Road
Drainange/Roadway Fire
Sta3on
#39
Photo
Voltaic
System Energy
Efficient
Ligh3ng
Replacement
At
Mul3ple
City
Bldgs AC
Upgrades
(Fire
Sta3ons
8
&
35;
CMPD
Computer
Room) Charlofe‐Mecklenburg
Police
Department
Green
Roof Animal
Control
Green
Roof CMU
‐
A/C
Equip.
Upgrade Discovery
Place
Chiller U3li3es
Opera3ons
Center
‐
LEED
Cer3fica3on ITS
Mgmt
Op3miza3on Central
Ave.
Improve.
At
Eastland
Mall Ped.
Safety/Sidewalks Thomasboro/Hoskings
Neighborhood
Improve.
Ph
3 Belmont
Neighborhood
Improve.
(Seigle
Ave
&
Gateways) ITS
Traffic
Mgmt
Expan. Intersec3on
Improvements Lifle
Rock
Rd
Realign. Dixie
River
Road NC29/US49
Widening
Ph
2
‐
N.
Trying
Street Fred
D.
Alexander
Blvd
(Sec3ons
B2
&
C) Park
and
Ride
Lots Transp.
Center
Rehab N.
Davidson
Maint.
Facility North
Corridor
Rail
Line
Grade
Crossings Bus
Purchase LYNX
Blue
Line
Enhancements North
Corridor
Rail
Line Beaqes
Ford
Watermain Burstonwood
Storm
Drain. Rockland
Rd
Culver
Repl. Wilora
Lake
Rehab. Griffith
Street
Libsta3on
Upgrade McAlpine
Wastewater
Treatment
Plant
Filter
Expansion
Design Storm
Drain
Repairs Stream
Restora3on Wastewater
Collec3on
System
Hydraulic
Models Wastewater
Collec3on
System
Rehabilita3on McAlpine
Relief
Sewer
Phase
2 Franklin
Water
Plant
Reservoir
Expansion Reedy
Creek
Wastewater
Collec3on
System Apron
Addi3on
‐
construct
an
addi3onal
apron
on
the
northern
end
of
the
airport
runway Apron
Overlay
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab Taxiway
Overlay
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab














400,000
 














70,000
 














60,000
 












600,000
 












600,000
 










4,000,000
 














40,000
 














40,000
 














40,000
 










4,400,000
 












100,000
 












200,000
 












100,000
 












300,000
 












400,000
 












400,000
 












500,000
 












100,000
 












200,000
 












300,000
 












300,000
 












400,000
 










1,000,000
 










1,000,000
 








12,000,000
 










1,500,000
 










2,000,000
 










2,600,000
 










3,000,000
 










3,200,000
 










5,000,000
 










7,400,000
 










8,000,000
 








13,000,000
 








13,000,000
 








22,000,000
 








10,000,000
 








15,000,000
 








30,000,000
 








30,000,000
 








90,000,000
 






110,000,000
 






335,000,000
 












600,000
 










1,000,000
 










1,000,000
 










1,000,000
 










1,600,000
 










1,600,000
 










2,000,000
 










2,000,000
 










2,000,000
 










4,500,000
 








20,000,000
 








35,000,000
 








39,000,000
 










1,080,000
 










2,790,000


4 5 5 6 10 40 2 5 10 40 5 5 5 5 6 6 10 3 6 8 8 12 28 28 336 42 56 72 84 90 140 207 224 364 364 616 280 420 840 840 2520 3080 9380 16 28 28 28 45 45 56 56 56 126 560 980 1092 12 12












2,950,000


12

Concord

NC

Airport












1,022,800


15

Concord

NC

Airport

Runway
Improvements
‐
overlay
surface
to
repair
aged
asphalt
and
provide
support
for
larger
aircrab,
improve
 runway
ligh3ng Hanger
Addi3on
‐
construct
a
new
hanger
to
provide
office
space
and
room
for
larger
aircrab












3,300,000


20

Concord

NC

Housing

Beverly
Hills
Park
Restroom
‐
construc3on
of
a
restroom
building
at
an
exis3ng
park
on
Miramar
Street
















95,000


8

Concord

NC

Housing
















15,000


8

Concord

NC

Housing
















45,000


8

Concord

NC

Housing

McInnis
Aqua3c
Center
Remodeling
‐
renova3on
of
the
entrance
to
the
pool
building
to
enhance
security
at
 the
window
and
shower
rooms Recrea3on
Center
Upgrades
‐
demoli3on
and
construc3on
to
create
a
front
desk/recep3on
area
and
offices
at
 Hartsell
Recrea3on
Center
and
Logan
Mul3‐Purpose
Center Rocky
River
Greenway
(Moss
Creek
Phase)
‐
improvements
to
the
Rocky
River
Greenway
between
Highway
73
 and
Harris
Road












1,000,000


12

7

City

State

Program

Concord

NC

Public
Safety

Project
Descrip3on

Concord

NC

Streets/Roads

Concord

NC

Streets/Roads

Concord

NC

Streets/Roads

Concord

NC

Water

Morehead
Road
Realignment
‐
realignment
of
exis3ng
road
between
US
29
and
Performance
Drive
to
match
 new
bypass
alignment
and
separate
pedestrian
and
vehicular
movement
near
speedway Weddington
Road/Bruton
Smith
Boulevard
Intersec3on/Corridor
Improvements
‐
intersec3on/corridor
 improvements
to
facilitate
the
movement
of
traffic
in
a
tourism
area
crea3ng
significant
conges3on
mi3ga3on
 impac3ng
Interstate
85 Franklin
Street
Stormwater
Sewer
‐
realignment
of
100
feet
of
42‐inch
stormwater
sewer

Concord

NC

Water

Concord

NC

Concord

Fire
Sta3on
#5
Renova3on
‐
renova3on
of
exis3ng
fire
sta3on
to
provide
needed
space
in
the
apparatus
bay
 and
housing
for
an
addi3onal
ladder
company Street
Improvements
‐
pave/rehabilitate
20
miles
of
municipal
street
infrastructure

Funding
Required

Jobs












1,325,250


8












2,500,000


16












8,000,000


50










16,000,000


120
















40,000


5

Georgia
Street
Culvert
‐
replacement
of
aging
infrastructure














198,000


5

Water

Glenwood
Drive
Culvert
‐
replacement
of
aging
infrastructure
















40,000


5

NC

Water

James
Street
Culvert
‐
replacement
of
aging
infrastructure














198,000


5

Concord

NC

Water

Long
Avenue
Waterline
‐
replacement
of
approximately
1,400
feet
of
6‐inch
waterline














186,000


5

Concord

NC

Water

Melrose
Avenue
Culvert
‐
replacement
of
aging
infrastructure














156,000


5

Concord

NC

Water

Princess
Street
and
Crowell
Drive
Culvert
‐
replacement
of
aging
infrastructure














156,000


5

Concord

NC

Water














130,000


5

Concord

NC

Water

Wolf
Meadow
Elementary
Waterline
‐
installa3on
of
approximately
2,200
feet
of
waterline
required
due
to
the
 closure
of
Philip
Morris Woodsdale
Place
Waterline
‐
replacement
of
approximately
220
feet
of
6‐inch
waterline
















40,000


5

Concord

NC

Water

Young
Street
Culvert
‐
replacement
of
aging
infrastructure














198,000


5

Concord

NC

Water














796,500


6

Concord

NC

Water














609,000


6

Concord

NC

Water














520,000


6

Concord

NC

Water














316,000


6

Concord

NC

Water












5,200,000


6

Concord

NC

Water

Havencrest
Sewer
Ouzall
‐
replacement
of
approximately
6,100
feet
of
sanitary
sewer
serving
a
por3on
of
the
 area
near
Poplar
Tent
and
I‐85 Hendrick
Sewer
Ouzall
‐
upsizing
of
approximately
1,100
feet
of
sanitary
sewer
to
accommodate
future
growth
 in
the
speedway
area Irish
Buffalo
Downtown
Sewer
Ouzall
‐
replacement
of
approximately
4,300
feet
of
sanitary
sewer
serving
part
 of
the
downtown
area Morrison
Road
Pump
Sta3on
Elimina3on
‐
extension
of
gravity
sanitary
sewer
to
eliminate
the
need
for
a
 wastewater
pump
sta3on
nearing
the
end
of
its
useful
life Triangle
Area
Water
Tank
‐
installa3on
of
a
2
MG
elevated
water
tank
to
enhance
water
storage
and
stabilize
 system
pressures
in
the
western
area
of
the
city Wilson
Street
Culvert
‐
replacement
of
aging
infrastructure














350,000


6

Concord

NC

Water














190,000


8

Concord

NC

Water

Durham

NC

CDBG

Irish
Buffalo
to
Zion
Church
Sewer
Phase
1
‐
replacement
of
approximately
1,956
feet
of
sanitary
sewer
and
 upgrades
to
an
exis3ng
ouzall Rocky
River
Golf
Course
Sewer
Ouzall
‐
replacement
of
approximately
2,500
feet
of
sanitary
sewer
serving
an
 area
along
Bruton
Smith
Boulevard AMERICAN
TOBACCO
TRAIL
PHASE
E
(INCLUDES
PEDESTRIAN
BRIDGE
OVER
I‐40)

Durham

NC

CDBG

APEX
STREET
BRIDGE














300,000


8

Durham

NC

CDBG

FRIENDLY
REST
HOME
RENOVATION
(PUBLIC
WORKS
WELLNESS
CENTER)














800,000


10

Durham

NC

CDBG

NC
147
PEDESTRIAN
BRIDGE

Durham

NC

CDBG

SIGN
&
SIGNAL
SHOP

Durham

NC

CDBG

Durham

NC

CDBG

Durham

NC

CDBG

Durham

NC

CDBG

Durham

NC

CDBG

C.M.
HERNDON
PARK
‐
THIS
PROJECT
CONSTRUCTS
STORMWATER
UTILITY
UPGRADES
TO
REGIONAL
ATHLETIC
 PARK CORNWALLIS
ROAD
PARK‐THIS
PROJECT
WILL
REPLACE
PLAYGROUND
THAT
IS
CURRENTLY
NOT
MEETING
LEVEL‐ OF‐SERVICE
OR
SAFETY
STANDARDS DURHAM
SKATEBOARD
PARK‐THIS
PROJECT
IS
FOR
THE
CONSTRUCTION
OF
DURHAM'S
FIRST
SKATEBOARD
 FACILITY. NORTHGATE
PARK
RENOVATION/UPGRADE‐THIS
PROJECT
WILL
CONSTRUCT
NEW
ELEMENTS
IN
NORTHGATE
 PARK
AND
UPGRADES
THE
28‐ACRE
PARK.
PROJECT
REPAIRS
INCLUDE
LIGHTING,
ELECTRICAL,
PLAYGROUNDS
 AND
GREENWAY
TRAIL. LYON
PARK
UPGRADE‐RENOVATION
OF
LYON
PARK
INCLUDING
IMPROVEMENTS
TO
THE
PLAYGROUND,
 PEDESTRIAN
CIRCULATION,
PARKING
AND
ADA
ACCESS
TO
FEATURES,
LANDSCAPING
AND
NEW
SITE
AMENITIES

Durham

NC

CDBG

Durham

NC

CDBG

Durham

NC

CDBG

Durham

NC

Durham Durham

OLD
LYON
PARK
CENTER
RENOVATION‐THIS
PROJECT
WILL
RENOVATE
THE
OLD
LYON
PARK
RECREATION
 CENTER
TO
MAKE
IT
ACCESSIBLE
AND
USABLE
AS
A
YOUTH
CENTER PARRISH
ST.
MUSEUM
WITHOUT
WALLS














787,500


8












2,459,617


16














200,000


12












1,000,000


12
















24,000


5














178,000


10














431,000


15














317,000


15














533,000


20














881,000


35












2,500,000


50












2,497,000


90

CDBG

THIRD
FORK
CREEK
TRAIL‐3.5
MILES
OF
PEDESTRIAN
GREENWAY
TRAIL
THAT
CONNECTS
SOUTHERN
 BOUNDARIES
AND
GARRETT
ROAD
PARKS;
ALSO
INCLUDES
DRAINAGE,
LANDSCAPING,
UTILITIES,
CREEK
 CLEANUP
BOARDWALK
CONSTRUCTION
AND
SITE
AMENITIES. DURHAM
STATION
PUBLIC‐PRIVATE
PARTNERSHIP












5,000,000


100

NC

CDBG

NEIGHBORHOOD
PUBLIC‐PRIVATE
PARTNERSHIP












2,000,000


100

NC

CDBG












3,353,000


120

Durham

NC

CDBG












4,245,000


150

Durham

NC

CDBG

OLD
CHAPEL
HILL
ROAD
PARK‐THIS
PROJECT
DESIGNS
AND
CONSTRUCTS
A
24‐ACRE
PARK
NEXT
TO
GITHENS
 MIDDLE
SCHOOL
WITH
SOCCER
FIELDS,
BASKETBALL
COURT,
TRAILS
AND
PARKING. BETHEDSA
PARK‐THE
CURRENT
FUNDING
FOR
THIS
PROJECT
DESIGNS
AND
CONSTRUCTS
A
20‐ACRE
PARK
 WITH
COMMUNITY
BUILDING,
COVERED
SPORT
COURTS,
DISC
GOLF
COURSE,
WALKING
TRAILS,
PLAYGROUND,
 AND
PARKING NEIGHBORHOOD
COMMERCIAL
STREETSCAPES










25,000,000


200

Durham

NC

Streets/Roads

CLAREMONT
CULVERT
REPLACEMENT














750,000


16

Durham

NC

Streets/Roads

FAYETTEVILLE
ST/RIDDLE
RD
IMPROVEMENTS














300,000


10

Durham

NC

Streets/Roads

LIGGETT/WEST
VILLAGE
STREETSCAPE












8,900,000


18

Durham

NC

Streets/Roads

MAIN
&
DILLARD
CULVERT














500,000


12

Durham

NC

Streets/Roads

MARKHAM
STREET
CULVERT












2,000,000


24

Durham

NC

Streets/Roads

SIDEWALK/ADA
CURB
RAMPS












6,212,600


20

Durham

NC

Streets/Roads

STREET
RESURFACING










10,000,000


45

Durham

NC

Streets/Roads

TRINITY
AVE.
CULVERT
REPLACEMENT












1,500,000


20

Durham

NC

Streets/Roads

PAVE
DIRT
STREETS










22,000,000


36

Durham

NC

Transit

NEW
DATA
OPERATIONS
FACILITY












1,076,000


12

City

State

Program

Durham

NC

Water

FLOATING
WETLAND

Project
Descrip3on

Fayefeville

NC

Airport
















55,000


1

Fayefeville

NC

Airport

Install
computerized
energy
management
system
for
ligh3ng
and
HVAC
control
in
the
terminal
building
and
 add
window
shades
on
the
west
window‐wall.
 Replace
airport
terminal
window
with
energy
saving
coated
materials.












2,000,000


10

Fayefeville

NC

Airport

Fire
drill
tower
replacement
on
airport
property.














1,250,000


20

Fayefeville

NC

CDBG

Purchase
4
hybrid
rear‐loading
garbage
trucks.
















840,000


3

Fayefeville

NC

CDBG

Replace
7
fire
vehicles
with
hybrid
preven3on
vehilces.















161,000


5

Fayefeville

NC

CDBG












1,000,000


12

Fayefeville

NC

CDBG

Storm
Drainage
improvement
projects
using
best
management
prac3ces
and
low
impact
development
 prac3ces
to
improve
quality
of
life
for
residents
and
water
quality
in
streams. Replace
solid
waste
general
fleet
with
hybrid
fuel
vehilces.













2,000,000


14

Fayefeville

NC

CDBG

Installa3on
of
5‐foot
concrete
sidewalks
along
thoroughfares..












5,000,000


20

Fayefeville

NC

CDBG

Specific
street
improvements
to
include
sidewalk
construc3on.












6,500,000


25

Fayefeville

NC

CDBG

Construct
Fayefeville
Community
Gardens
(20
acres).















500,000


30

Fayefeville

NC

CDBG

Construct
"Walkable
Community
Blount's
Creek
Trail".















700,000


43

Fayefeville

NC

CDBG

Construct
Linear
Park
Trail
Phase
3.















850,000


43

Fayefeville

NC

CDBG

Construc3on
of
2
new
fire
sta3ons.












2,500,000


75

Fayefeville

NC

CDBG

Construct
North
Carolina
Veteran's
Park
Visitors
and
Training
Center.













2,500,000


80

Fayefeville

NC

CDBG












2,500,000


115

Fayefeville

NC

Energy

Downtown
street
repair
and
resurfacing
and
streetscape
improvements
to
spur
residen3al
and
commercial
 economic
development
in
the
central
city. Install
Solar
Panels
on
PWC
campus














350,000


1

Fayefeville

NC

Energy

Green
Retrofit
of
Solid
Waste
Office
Facility.

















95,000


2

Fayefeville

NC

Energy

Install
2,500
Cleartricity
meters
and
suppor3ng
Gateway,
fed
by
PWC
substa3on
transforner.












1,000,000


6

Fayefeville

NC

Energy












4,000,000


22

Fayefeville

NC

Energy

Act
on
Energy
Audit
Recommenda3ons.

Install
energy
saving
upgrades
to
City
owned
buildings
per
consultant
 recommenda3ons
. Retrofit
of
15
City
Fire
Sta3ons
for
Energy
savings..












4,500,000


22

Fayefeville

NC

Public
Safety

Purchase
hybrid
vehilces.














480,000


0

Fayefeville

NC

Public
Safety

Purchase
Segway
Scooters
puqng
more
officers
on
the
streets.
















12,000


0

Fayefeville

NC

Public
Safety

Construct
a
daycare
for
employees.














500,000


20

Fayefeville

NC

Public
Safety

Construc3on
of
Police
Training
Center.












1,416,781


22

Fayefeville

NC

Public
Safety

Contruc3on
of
Forensic
ID
Tech
Building.












2,500,000


22

Fayefeville

NC

Public
Safety

Construc3on
of
a
Public
Safety
Sta3on.












4,625,000


122

Fayefeville

NC

Streets/Roads

15
Video
Surveillance
Cameras
for
ITS/Incident
management.

Fawyefeville,
NC














400,000


4

Fayefeville

NC

Streets/Roads










18,696,000


6

Fayefeville

NC

Streets/Roads














700,000


12

Fayefeville

NC

Streets/Roads

Streetlight
conversion.

Replacing
18,696
tradi3onal
streetlights
with
more
energy
efficient
LED
lights
on
 residen3al
streets
and
thoroughfares. US
401
Bypass
at
Morganton
Road
‐Construct
a
right
turn
lane
on
US
401
Bypass
and
a
right
turn
lane
on
 Morganton
Road.
 Paving
6444
feet
of
soil
streets














841,220


40

Fayefeville

NC

Transit

Purchase
8
hybrid
buses.












4,500,000


10

Fayefeville

NC

Transit

Construct
a
mul3modal
center.










15,000,000


50

Fayefeville

NC

Water














150,000


3

Fayefeville

NC

Water












8,561,000


120

Gastonia

NC

Amtrak












5,000,000


50

Gastonia

NC

CDBG
















60,000


10

Gastonia

NC

CDBG
















50,000


15

Gastonia

NC

CDBG

Garbage
truck
wash
reloca3on
and
rebuild
using
a
reclaimed
and
recycled
water
system.

The
system
needs
a
 reclama3on
system,
oil/water
separator,
canopy,
drains
and
pipe
to
the
sanitary
sewer
system. Install
public
sanitary
sewer
services
in
exis3ng
high
density
neighborhoods
to
approximately
480
proper3es.


 This
includes
approximately
7
miles
of
sanitary
sewer
main,
a
lib
sta3on
and
a
force
main.

The
purpose
of
the
 project
is
to
provide
the
cit Gastonia
Mul3‐Modal
Transporta3on
Center
‐
AMTRAK
INFRASTRUCTURE
ONLY
‐
Including
track
 improvements,
new
track,
and
new
plazorm. Highland
Rail
Trail
Parking
Lot
‐ Project
includes
construc3on
of
a
parking
area
for
the
Highland
Rail
Trail. Lineberger
Park/Greenway
Parking
Lot
‐
Project
includes
paving
a
gravel
lot
that
provides
parking
for
park
 visitors. Highland
Rail
Trail,
Phase
III
‐
Connects
exis3ng
rail‐trail
to
Rankin
Lake
Park.














700,000


20

Gastonia

NC

CDBG














500,000


20

Gastonia

NC

CDBG














600,000


30

Gastonia

NC

CDBG














560,000


40

Gastonia

NC

CDBG














770,000


40

Gastonia

NC

CDBG












1,700,000


45

Gastonia

NC

CDBG












1,500,000


50

Gastonia

NC

CDBG












5,400,000


120

Gastonia

NC

CDBG










15,000,000


300

Gastonia

NC

CDBG










10,000,000


350

Lineberger
Park
Pool
Renova3on
‐ This
project
will
consist
of
pool
and
bath
house
renova3ons. Gum‐Ida‐Hemlock
Storm
System
Upgrade
‐
The
project
upgrades
the
exis3ng
stormwater
management
system
 in
an
economically
distressed
area
where
exis3ng
storm
drain
piping
and
drain
structures
are
failing. Mariefa
Street
Pedestrian
Project
‐
Located
in
the
heart
of
Gastonia’s
central
business
district,
enhancements
 include
adding
a
10’‐14’
wide
pedestrian
walk
on
the
bridge
and
installing
decora3ve
landscaping
planters
and
 light
bollards. South@Main
Pavilion
Park
‐
Development
of
a
downtown
park/plaza
to
act
as
a
focal
point,
afrac3ng
visitors,
 downtown
employees
and
the
general
public
to
the
Center
City. Rankin
Lake
Park
Improvements
‐ Paved
trail
around
exis3ng
80
acre
lake,
corporate
picnic
pavilion,
piers
&
docks,
playground,
picnic
shelters,
 new
roof
&
façade
for
exis3ng
clubhouse,
&
lake
warden
sta3on. Lineberger
Park
Phase
II
‐ Project
includes
the
addi3on
of
restrooms,
a
greenway
trail
extension,
picnic
shelter
renova3ons,
a
small
 amphitheatre,
playground,
&
carousel. Downtown
Parking
Deck
‐
Includes
construc3on
of
a
300‐space
parking
deck
in
downtown
Gastonia
in
concert
 with
other
projects
in
downtown,
including
PROJECT
BIG
SPLASH. Gastonia
Mul3‐Modal
Transporta3on
Center
‐
(EXCLUDING
Amtrak
costs)
Project
includes
facility
construc3on
 and
opera3on
of
Gastonia
Transit,
Gaston
County
Access,
Amtrak,
Greyhound,
and
Express
Bus
routes
to
 Charlofe. Project
BIG
SPLASH
‐
An
acronym
for
"Bringing
Investment
to
Gastonia
in
Support
of
a
Project
Linking
Aqua3cs,
 Sports
and
Hospitality."

Project
includes
an
aqua3cs
center,
fitness
facility,
and
quality
mee3ng
space.

Funding
Required 














45,000


Jobs 8

City

State

Program

Gastonia

NC

Public
Safety

Gastonia

NC

Public
Safety

Gastonia

NC

Public
Safety

Gastonia

NC

Public
Safety

Gastonia

NC

Streets/Roads

Gastonia

NC

Streets/Roads

Gastonia

NC

Streets/Roads

Gastonia

NC

Streets/Roads

Gastonia

NC

Streets/Roads

Gastonia

NC

Streets/Roads

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Gastonia

NC

Water

Rocky
Mount

NC

Airport

Police
800
mgh
radio
project
‐
Ini3al
infrastructure
was
built
and
paid
for
through
UASI
funding.
The
actual
 radios
need
to
be
funded
to
complete
the
project.
 Fiber
Op3c
Extension
to
Mul3ple
Cell
Tower
Sites
to
increase
communica3on
op3ons
for
public
and
private
 sectors. Northwest
Gastonia
Fire
Sta3on
‐ Build
Fire
Sta3on
in
the
area
due
to
coverage
and
ISO
requirements
for
effec3ve
coverage
in
the
area.

 Purchase
would
include
property
and
construc3on
costs
es3mated
at
$4.5
M. Southeast
Gastonia
Fire
Sta3on
‐
Build
Fire
Sta3on
in
the
area
due
to
coverage
and
ISO
requirements,
pending
 further
development
in
the
area.

Purchase
would
include
property
and
construc3on
costs
es3mated
at
$4.5
 M. Gastonia
Industrial
Park
Street
Improvements
‐
Paving
of
dirt
street
that
would
provide
an
interconnect
 between
two
exis3ng
industrial
parks.

The
improvements
would
be
within
the
Gastonia
Industrial
Park
off
 Bessemer
City
Road. Paving
of
stone
streets
in
economically
depressed
areas
of
Gastonia.

Street
paving
would
include
Red3p,
 Heart,
Chesser,
and
Edison
Streets.

Property
owners
have
pe33oned
the
City
for
upgrades
and
the
City
will
 maintain
aber
brought
up
to
standards. The
City’s
“missing
link”
sidewalk
list
targets
areas
where
new
sidewalks
would
add
important
connec3ons
 within
areas
of
high
pedestrian
ac3vity.

Projects
are
typically
located
near
the
Center
City,
schools,
shopping
 areas,
and
neighborhoods. Highland
Neighborhood
Street
and
Streetscape
Improvements
‐ Project
includes
street
and
drainage
improvements,
underground
electric
u3li3es,
curb
and
gufering
and
 sidewalks
within
an
inner
city
residen3al
revitaliza3on
area. Pavement
Maintenance/Reconstruc3on

‐
A
2006
Pavement
Condi3on
Survey
found
that
nearly
22%
of
the
 streets
in
the
City
need
some
level
of
maintenance,
which
includes
patching,
crack
pouring,
short
overlays
and
 plant
mix
resurfacing. Gaston
Mall
Redevelopment
Partnership
‐
The
$37M
project
includes
redeveloping
a
185,000
square
foot
 major
retail
center.

Private/Public
investment
to
construct
new
roadway
connec3ng
two
major
thoroughfares,
 at
one
of
our
most
congested
intersec3ons. Fairview
Road
Water
Line
‐
Project
connects
the
City’s
premier
industrial
park
to
City
water
service
to
 accommodate
future
development.

The
project
would
extend
water
lines
between
Technology
Parkway
and
 Fairview
Drive. Long
Creek
WWTP
Electrical
System
Improvements
‐
Improvements
to
prevent
single
point
failures
that
could
 result
in
catastrophic
failure
of
the
wastewater
treatment
process
and
subsequent
damage
to
the
environment
 and
threat
to
public
health.
 Water
Treatment
Plant
(Downtown)
Upgrades
‐Immediate
structural
and
electrical
upgrades
to
maintain
 current
water
treatment
capacity. Sewer
Rehabilita3on
Projects
‐
Rehabilita3on
of
exis3ng
sewer
lines
iden3fied
in
a
recent
study.

Projects
will
 include
rehabilita3on
of
sewer
lines
and
manholes
to
reduce
infiltra3on
and
inflow
into
the
sanitary
sewer
 system.
 Water
Service
to
Crowders
Mountain
‐
Project
includes
construc3on
of
water
lines,
a
booster
sta3on,
and
 storage
tank
for
western
pressure
zone
needs
at
Crowders
Mountain
State
Park. Water/Sewer/Electrical
Service
to
Paysour
Mountain
‐
Project
provides
water,
sewer,
and
electrical
service
to
 the
Paysour
Mountain
Technology
Park
for
homeland
security
and
alternate
energy
research.

($7.7M
water,
 $8.5M
sewer,
$400,000
electrical) Regional
Biosolids
Dewatering/Drying
Facility
‐
Land
applica3on
of
Class
B
wastewater
treatment
residuals
may
 not
be
sustainable
long‐term.

A
regional
facility
was
outlined
in
a
recent
study
and
could
be
constructed
at
the
 Long
Creek
WWTP
site. Update/Up‐rate
Exis3ng
Water
Treatment
Plant
to
30
MGD
(max)
and
add
membrane
filters.
Includes
 demolishing
some
and
up‐ra3ng
other
filters.

Effluent
from
these
filters
would
then
be
further
treated
using
 membrane
technology. Southeast
Wastewater
Treatment
Plant
‐
Project
replaces
the
exis3ng
pump
sta3ons
in
southeast
Gastonia
 with
a
wastewater
treatment
plant
to
address
extensive
growth
in
this
area. Land
acquisi3on
for
obstruc3on
removal

Project
Descrip3on

Rocky
Mount

NC

Airport

Rocky
Mount

NC

Rocky
Mount

Funding
Required

Jobs












1,200,000


10














250,000


20












4,500,000


80












4,500,000


80














250,000


15














300,000


20














750,000


25












1,200,000


50












2,100,000


55












3,100,000


75














550,000


30












1,500,000


50












1,300,000


50












6,400,000


60












8,500,000


65










16,000,000


75










20,000,000


100










75,000,000


100










13,000,000


120














675,000


1

Terminal
enhancements














200,000


2

Amtrak

Upgrades
to
Amtrak
customer/traveler
ameni3es
at
City‐owned
Train
Sta3on














300,000


5

NC

CDBG

Build
shelter
at
(under
construc3on)
Three
Sisters'
Park
in
Bafleboro
Community
















60,000


2

Rocky
Mount

NC

CDBG

Replace
light
poles
at
City
parks
















20,000


2

Rocky
Mount

NC

CDBG

Install
and
replace
playground
equipment
at
City
parks














125,000


3

Rocky
Mount

NC

CDBG

Install
fencing
to
improve
security
at
City
parks
















60,000


4

Rocky
Mount

NC

CDBG

Construct
8
shelters
at
City
parks
that
need
addi3onal
or
replacement
shelters














250,000


5

Rocky
Mount

NC

CDBG

Demolish
old
City
theatre
(not
inhabitable)
and
convert
site
to
community
use














250,000


5

Rocky
Mount

NC

CDBG

Redevelopment
of
former
site
of
Planters
Oil
Mill














500,000


5

Rocky
Mount

NC

CDBG

Renovate
unused
por3on
of
City‐owned
Senior
Center
for
use
as
employee
fitness
center














250,000


5

Rocky
Mount

NC

CDBG

Replace
gymnasium
floor
and
repaint
at
South
Rocky
Mount
Community
Center














250,000


5

Rocky
Mount

NC

CDBG

Replace
gymnasium
floor
at
Booker
T.
Washington
Community
Center














125,000


5

Rocky
Mount

NC

CDBG

Resurface
35
tennis
courts
at
10
City
parks,
all
in
need
of
resurfacing














175,000


5

Rocky
Mount

NC

CDBG

Resurface
12
City
park
basketball
courts,
all
over
25
years
old
















70,000


6

Rocky
Mount

NC

CDBG

Complete
remaining
phases
of
Rocky
Mount
Sports
Complex












1,200,000


10

Rocky
Mount

NC

CDBG

Complete
renova3on
of
3rd
floor
of
Imperial
Centre
for
the
Arts
&
Sciences












1,000,000


10

Rocky
Mount

NC

CDBG

Redevelopment
of
Home
Street
neighborhood














500,000


10

Rocky
Mount

NC

CDBG

Complete
phase
I
construc3on
of
Douglas
Block
economic
redevelopment
project












2,000,000


20

Rocky
Mount

NC

CDBG












1,500,000


20

Rocky
Mount

NC

CDBG

Purchase
tax‐foreclosed
downtown
buildings
or
offer
grants/loans
to
owners
in
order
to
bring
buildings
up
to
 current
codes
(10
buildings,
50,000
square
feet) Redevelopment
of
Beal
Street
neighborhood












1,500,000


20

Rocky
Mount

NC

CDBG

Stabiliza3on
of
historic
neighborhoods












1,000,000


20

Rocky
Mount

NC

CDBG

Renovate
City‐owned
Booker
T.
Washington
High
School
for
economic
redevelopment
and
con3nued
use
by
 local
nonprofit
for
job
training
and
peronal
development
programs












8,000,000


50

City

State

Program

Rocky
Mount

NC

Energy

Project
Descrip3on

Rocky
Mount

NC

Energy

Rocky
Mount

NC

Energy

Rocky
Mount

NC

Energy

Rocky
Mount

NC

Energy

Rocky
Mount

NC

Housing

Retrofit
25‐year‐old
City
Hall
with
energy‐efficient
fixtures
and
replacement
of
windows
(primary
contributor
to
 energy
waste) Construc3on
of
senior
ci3zen
housing
as
part
of
planned
community
redevelopment
projects

Rocky
Mount

NC

Housing

Rocky
Mount

NC

Rocky
Mount

NC

Rocky
Mount

Rebuild
or
replace
inefficient
chiller
system
at
Braswell
Memorial
Library
(City‐supported)
with
energy‐efficient
 model,
replace
controls
(where
needed)
to
further
enhance
efficienty
and
conserva3on Replace
25‐year‐old,
inefficient
chillers
at
City
Hall
used
for
HVAC
with
energy‐efficient
models,
replace
HVAC
 controls
to
further
enhance
efficiency
and
conserva3on Replace
inefficient
HVAC
system
at
City
Senior
System
with
energy‐efficient
model,
replace
controls
to
further
 enhance
efficiency
and
conserva3on Retrofit
sprayground
facility
at
Sunset
Park
to
recycle
water,
reducing
water
consump3on

Funding
Required

Jobs














500,000


2














600,000


2














550,000


2














250,000


4












1,000,000


5














750,000


2

Supplement
exis3ng
City
support
for
nonprofit
housing
incen3ve
programs














250,000


15

Public
Safety

Install
MDT
units
in
Fire
response
units














300,000


2

Public
Safety

Replace
MDT
units
in
Police
patrol
cars














250,000


2

NC

Public
Safety

Upgrade
Enhanced
911
System
with
improved
capabili3es














500,000


2

Rocky
Mount

NC

Public
Safety














800,000


5

Rocky
Mount

NC

Public
Safety














350,000


6

Rocky
Mount

NC

Schools














500,000


4

Rocky
Mount

NC

Schools

Install
automated
vehicle
locator
(AVL)
system
in
public
safety
cars
and
other
cri3cal
response
units
to
facilitate
 coordinated
dispatching
in
emergency
situa3ons Hire
6
patrol
officers
through
COPS
Program
to
staff
Special
Enforcement
Team
(SET)
in
order
to
reduce
 presence
of
targeted
criminal
ac3vity Restore
and
digi3ze
Killebrew
photography
collec3on
held
at
Braswell
Memorial
Library
(City‐supported
 facility) Open
planned
local
history
museum
at
Imperial
Centre














800,000


5

Rocky
Mount

NC

Schools














500,000


10

Rocky
Mount

NC

Streets/Roads

Expand
exis3ng
and
ins3tute
planned
new
educa3on
enrichment
programs
at
Braswell
Memorial
Library
(City‐ supported
facility) Reconstruc3on
of
roadways
at
railroad
crossings

Rocky
Mount

NC

Streets/Roads

Rocky
Mount

NC

Rocky
Mount

NC

Rocky
Mount














750,000


8

Planned
improvements
to
City's
stormwater
management
system
(4
projects)












2,000,000


15

Streets/Roads

Accelerate
street
construc3on
and
reconstruc3on












1,500,000


20

Streets/Roads

Accelerate
street
repaving
projects












5,000,000


20

NC

Streets/Roads

U3lity
realignment
for
Downtown
Streetscape
(current
SAFETEA
Project)












2,000,000


20

Rocky
Mount

NC

Streets/Roads

Construc3on
of
Southern
Connector
highway










10,000,000


40

Rocky
Mount

NC

Transit

Purchase
shufle
route
bus
















30,000


1

Rocky
Mount

NC

Transit

Purchase
transit
service
vehicle
for
road
calls
and
other
needs
















85,000


1

Rocky
Mount

NC

Transit

Build
replacement
transit
vehicle
wash
facility














325,000


2

Rocky
Mount

NC

Transit

Construc3on
of
20
bus
shelters
at
exis3ng
bus
stops














100,000


2

Rocky
Mount

NC

Transit

Purchase
exis3ng
facility
and
relocate
bus
driver
offices














200,000


2

Rocky
Mount

NC

Transit

Build
facility
for
storage
of
transit
buses














400,000


4

Rocky
Mount

NC

Water

Planned
upgrades
and
improvements
to
water
treatment
plants














400,000


2

Rocky
Mount

NC

Water

Planned
upgrades
and
improvements
to
wastewater
treatment
plant












1,500,000


5

Rocky
Mount

NC

Water

Planned
extension
of
City's
water
system
(4
projects)












1,500,000


10

Rocky
Mount

NC

Water

Planned
extension
of
City's
wastewater
system
(5
projects)












9,000,000


60

Winston‐Salem

NC

CDBG

New
C&D
landfill
construc3on












4,000,000


10

Winston‐Salem

NC

CDBG

Public
infrastructure
to
support
film
and
theater
produc3on












1,000,000


20

Winston‐Salem

NC

CDBG

Storm
water
floodplain
housing
buy‐out
and
open/park
space
crea3on












2,400,000


20

Winston‐Salem

NC

CDBG

Playgrounds
parks
and
recrea3on
centers












4,500,000


25

Winston‐Salem

NC

CDBG

Civic
Plaza
Park












3,000,000


30

Winston‐Salem

NC

CDBG

Greenways
and
trails
(Parks
access)












1,000,000


30

Winston‐Salem

NC

CDBG

Airport
Business
Park,

could
create
up
to
1200
jobs
at
build
ou












5,000,000


50

Winston‐Salem

NC

CDBG

Sedge
Garden
Gymnasium












5,000,000


50

Winston‐Salem

NC

CDBG

City
Yard
reloca3on
and
redevelopment












8,000,000


80

Winston‐Salem

NC

CDBG

Storm
drainage
projects












3,000,000


80

Winston‐Salem

NC

CDBG

Goler
(workforce/affordable
housing)












8,000,000


100

Winston‐Salem

NC

CDBG

Revitalizing
Urban
areas

Redevelopment,














500,000


100

Winston‐Salem

NC

CDBG

Swimming
pool
spray
park
conversions














500,000


100

Winston‐Salem

NC

CDBG

New
industrial
park,
could
create
up
to
2500
new
jobs
at
build
out












2,000,000


200

Winston‐Salem

NC

CDBG

PTRP:
road,
u3lity
and
other
infrastructure,
could
create
up
to
20,000
new
jobs
at
build
out










26,200,000


300

Winston‐Salem

NC

Energy

Business
40
ligh3ng
replacement












3,000,000


20

Winston‐Salem

NC

Energy

City
building
renova3ons
for
LEED












2,000,000


50

Winston‐Salem

NC

Energy

Energy
Efficent
HVAC
upgrades
at
Coliseum,
Conven3on
Center
and
Bowman
Gray
Stadium












3,000,000


50

Winston‐Salem

NC

Energy

Energy
efficient
ligh3ng
upgrades
at
and
around
City
facili3es












4,000,000


80

Winston‐Salem

NC

Energy

City
Parking
Deck
Energy
Efficient
Ligh3ng
and
other
Upgrades












6,000,000


150

Winston‐Salem

NC

Energy

Public
Safety
Center
LEED
based
renova3on












9,500,000


250

Winston‐Salem

NC

Housing

Johnson
Square
Apartments
repair
and
renova3on












3,600,000


80

Winston‐Salem

NC

Public
Safety

Crime
lab/forensics
equipment














350,000


0

Winston‐Salem

NC

Public
Safety

Fire
Apparatus
replacement












1,200,000


0

Winston‐Salem

NC

Public
Safety

Mobile
command
post
(for
police
and
fire)














500,000


0

Winston‐Salem

NC

Public
Safety

Tasers
for
law
enforcement
officers














500,000


0

Winston‐Salem

NC

Public
Safety

Youth
gang
preven3on
educa3on
materials














250,000


0

Winston‐Salem

NC

Public
Safety

Addi3onal
patrol
officers
‐expansion
of
police
visibility
and
crime
preven3on
efforts












1,200,000


20

Winston‐Salem

NC

Public
Safety

Fire
vehicle
maintenance
facility














700,000


20

Winston‐Salem

NC

Public
Safety

Reentry
job
corp
for
grafiq
removal
and
city
parks
and
public
space
maintenance














400,000


20

Winston‐Salem

NC

Public
Safety

addi3onal
school
resource
officers












2,500,000


25

Winston‐Salem

NC

Public
Safety

Construc3on
of
fire
sta3on
19












2,700,000


25

Winston‐Salem

NC

Public
Safety

Fire
Sta3on
21












2,000,000


25

City

State

Program

Winston‐Salem

NC

Public
Safety

Fire
Sta3on
22

Project
Descrip3on

Funding
Required 










1,000,000


Jobs 25

Winston‐Salem

NC

Public
Safety

Winston‐Salem

NC

Public
Safety

Fire
Sta3on
8
reloca3on












3,000,000


25

Decentralized
district
substa3ons












1,000,000


Winston‐Salem

NC

30

Public
Safety

Firing
range










12,000,000


Winston‐Salem

30

NC

Public
Safety

Addi3onal
special
puropse
officers












4,600,000


46

Winston‐Salem

NC

Public
Safety

Defensive
driving
vehicle
training
facility












5,000,000


50

Winston‐Salem

NC

Public
Safety

Fire
Sta3on
renova3ons












1,000,000


50

Winston‐Salem

NC

Public
Safety

Emergency
Opera3ons
Center












6,000,000


100

Winston‐Salem

NC

Public
Safety










40,000,000


150

Winston‐Salem

NC

Streets/Roads

Law
Enforcement
Training
Facili3es‐comple3on
of
up
fit
to
training
building
and
construc3on
of
in‐door
city‐ county
firing
range Mar3n
Luther
King
Jr
Drive
traffic
calming
and
pedestrian
safety














500,000


10

Winston‐Salem

NC

Streets/Roads

US
52
ramp
and
Vargrave
Street
Reconfigura3on












8,000,000


10

Winston‐Salem

NC

Streets/Roads

Intersec3on
Traffic
Safety
Projects














600,000


20

Winston‐Salem

NC

Streets/Roads

Old
Salem
Sidewalks
Repair,
Streetlight
Upgrades
and
Tree
Replacement
Project














750,000


20

Winston‐Salem

NC

Streets/Roads

University
Parkway
widening










11,000,000


20

Winston‐Salem

NC

Streets/Roads

Two
Way
of
3rd,
4th,
and
5th
Streets














800,000


30

Winston‐Salem

NC

Streets/Roads

Bridge
Replacement
projects












2,000,000


50

Winston‐Salem

NC

Streets/Roads

Clemmonsville
Road
extension












5,000,000


50

Winston‐Salem

NC

Streets/Roads

Greenway
construc3on
(Transporta3on)












1,000,000


50

Winston‐Salem

NC

Streets/Roads

Kernersville
Road
super‐street
at
Sedge
Garden
Road












3,000,000


50

Winston‐Salem

NC

Streets/Roads

Traffic
signal
sytem
upgrades












6,000,000


50

Winston‐Salem

NC

Streets/Roads

Resurfacing
of
streets










14,000,000


60

Winston‐Salem

NC

Streets/Roads

Peters
Creek
Parkway
Interchange
Replacement
at
Business
40










12,000,000


70

Winston‐Salem

NC

Streets/Roads

Peace
Haven
and
US
421
interchange
improvements










15,000,000


75

Winston‐Salem

NC

Streets/Roads

Salem
Creek
connector
and
Research
Parkway










16,000,000


80

Winston‐Salem

NC

Streets/Roads

Sidewalk
construc3on












6,000,000


80

Winston‐Salem

NC

Streets/Roads

Brookstown
Phase
II,
$7,000,000
could
create
up
to
500
jobs
at
build
out












5,000,000


100

Winston‐Salem

NC

Streets/Roads

Roadway
projects
supplemented
by
local
bonds










12,000,000


120

Winston‐Salem

NC

Streets/Roads

Union
Cross
Road
widening










60,000,000


160

Winston‐Salem

NC

Transit

Fixed
Route
and
Paratransit
Buses












7,100,000


20

Winston‐Salem

NC

Transit

Streetcar










14,000,000


80

Winston‐Salem

NC

Transit

Union
Sta3on/Davis
Garage,
could
create
up
to
250
jobs
at
build
out












5,000,000


100

Winston‐Salem

NC

Water

Water
and
Sewer
GIS/Work
Order
Management
System












2,700,000


10

Winston‐Salem

NC

Water

Yadkin
River
Land
Protec3on
Buffer
Purchase












1,000,000


10

Winston‐Salem

NC

Water

Muddy
Creek
Find
and
Fix
Project












3,000,000


15

Winston‐Salem

NC

Water

Neighborhood
water/sewer
rehabilita3on












6,000,000


20

Winston‐Salem

NC

Water

New
Elevated
Water
Tanks












6,800,000


20

Winston‐Salem

NC

Water

Reentry
job
corp
for
water
suply
creek
cleanups














400,000


20

Winston‐Salem

NC

Water

Water
Tank
Rehabilita3on












3,700,000


20

Winston‐Salem

NC

Water

Construc3on
and
Maintenance
Facili3es
Improvements












3,500,000


25

Winston‐Salem

NC

Water

Winston‐Salem
State
University
Campus
Distribu3on
System
Improvements












4,600,000


25

Winston‐Salem

NC

Water

Replcement
of
2"
water
mains












4,000,000


50

Winston‐Salem

NC

Water

Wastewater
Collec3on
Improvements












2,000,000


50

Winston‐Salem

NC

Water

Drainage
Improvements
on
Private
Property












5,500,000


80

Winston‐Salem

NC

Water

Neilson
Water
Treatment
Plant










15,000,000


100

Winston‐Salem

NC

Water

Rebuld
of
Thomas
Water
Treatment
Plant










25,000,000


125

Winston‐Salem

NC

Water

Water
Supply
reservoir
dam
rehabilita3on










25,000,000


125

Winston‐Salem

NC

Water

Elledge
Waste
Water
Plant
system
rehabilita3on
and
land
buffer
enhancements










51,000,000


150

Winston‐Salem

NC

Water

PTRP
stormwater
project










12,000,000


150

Winston‐Salem

NC

Water

Chify
High
Service
Pumping
Sta3on
‐
Standby
Power










51,000,000


160

Grand
Forks

ND

Airport

Airport
Terminal
construc3on
‐
remaining
$4M
of
the
$20M
project
not
allocated
through
AIP.












4,000,000


80

Grand
Forks

ND

CDBG

Land
for
new
construc3on
of
affordable
housing
development












2,400,000


0

Grand
Forks

ND

CDBG

Community
Bricks
and
Mortar
projects
currently
unfunded
through
regular
CDBG
alloca3ons














750,000


15

Grand
Forks

ND

CDBG

Acquire/rehab/convert
exis3ng
building
as
part
of
the
city/state
homeless
plan














850,000


17

Grand
Forks

ND

CDBG

Infrastructure
projects
and
acquisi3on/demoli3on
in
targeted
neighborhood












1,000,000


20

Grand
Forks

ND

CDBG

Extend
Promenade
housing
development
(50
units)
with
the
increase
of
30
rental
lots












4,000,000


40

Grand
Forks

ND

CDBG

Extend
Promenade
housing
development
(50
units)
with
the
increase
of
41
for‐sale
lots












5,700,000


60

Grand
Forks

ND

Energy

Bio‐Diesel
or
Mul3‐fuel
Fire
Truck














500,000


0

Grand
Forks

ND

Energy

Convert
25%
of
exis3ng
city
passenger
vehicle
fleet
to
bio‐deisel
and/or
hybrid














500,000


0

Grand
Forks

ND

Energy

Convert
ligh3ng
in
Public
Library
to
energy
efficient
CFL's
















25,000


1

Grand
Forks

ND

Energy

Demonstra3on
project
for
Community
Rain
Gardens
















10,000


1

Grand
Forks

ND

Energy

Demonstra3on
project
for
installa3on
of
Wind
Turbine(s)
at
City
Facility














100,000


2

Grand
Forks

ND

Energy














100,000


2

Grand
Forks

ND

Energy

Energy
Alliance
‐
Weatheriza3on
Coordina3on
project
to
increase
energy
efficiency
for
all
income
households
‐
 Demonstra3on
Project Upgrade
ligh3ng
for
all
exis3ng
Fire
Sta3ons

Grand
Forks

ND

Energy

Grand
Forks

ND

Energy

Grand
Forks

ND

Energy

Grand
Forks

ND

Energy














134,000


2

Energy
Efficiency
upgrades
for
Alerus
Center












1,200,000


12

Energy
update
and
retrofit
of
Central
Fire
Sta3on
including

installa3on
of
Wind
and
Photovoltaic
energy
 sources Citywide
traffic
signal
upgrades
with
new
technology
and
electronics














630,000


12












2,000,000


20

Installa3on
of
Large‐Wind
genera3on
project
to
provide
energy
for
Public
Safety
Training
Facility
and
for
 redistribu3on












1,125,000


22

City

State

Program

Grand
Forks

ND

Energy

Energy
Efficiency
upgrades
for
exis3ng
municipal
buildings

Project
Descrip3on

Funding
Required 










5,500,000


Jobs 30

Grand
Forks

ND

Energy

Capture
Methane
gas
at
exis3ng
landfill
site
and
convert
to
energy
for
use
and
distribu3on

Grand
Forks

ND

Public
Safety

Acquire
land
for
future
Fire
Sta3on
as
listed
in
capital
improvement
plan












4,000,000
 












243,000


40

Grand
Forks

ND

Public
Safety

Install
new
and
updated
security
systems
at
Fire
Department
Facili3es














100,000


2

Grand
Forks

ND

Public
Safety

Provide
Coverage
for
Airport
Security
by
Grand
Forks
Police
Department
Uniform
Patrol
Bureau














110,000


2

Grand
Forks

ND

Public
Safety

Grand
Forks

ND

Public
Safety

Upgrade
current
single
transmit
public
safety
radio
system
to
simulcast,
add
addi3onal
receiver
sites,
and
add
 in‐building
signal
amplifica3on
to
cri3cal
public
facili3es. Upgrade
and
relocate
current
9‐1‐1
Center

Grand
Forks

ND

Streets/Roads

Grand
Forks

ND

Grand
Forks














800,000


16












2,600,000


52

20th
St.
N.
seal
coat
from
Gateway
Dr.
to
University
Ave.
















60,000


2

Streets/Roads

Mill
Road
seal
coat
from
Gateway
Dr.
to
Washington
St.














100,000


2

ND

Streets/Roads

Intersec3on
upgrade
at
11th
Ave.
S.
and
42nd
St.
S.














290,000


6

Grand
Forks

ND

Streets/Roads

University
Ave.
seal
coat
from
3rd
St.
N.
to
State
St.














280,000


6

Grand
Forks

ND

Streets/Roads

32nd
Ave.
S.
concrete
panel
replacement
from
Belmont
Rd.
to
S.
Washington














325,000


7

Grand
Forks

ND

Streets/Roads

51st
St.
N.
concrete
panel
replacement
from
10th
Ave.
N.
to
University
Ave.














375,000


8

Grand
Forks

ND

Streets/Roads

Construc3on
of
20th
Ave.
S.
from
25th
St.
to
Columbia
Rd.














460,000


9

Grand
Forks

ND

Streets/Roads

Roundabout
at
34th
St.
and
24th
Ave.
S.














450,000


9

Grand
Forks

ND

Streets/Roads

17th
Ave.
S.
concrete
panel
replacement
from
Washington
St.
to
Columbia
Rd.














500,000


10

Grand
Forks

ND

Streets/Roads

47th
Ave.
S.
reconstruc3on
from
S.
Washington
to
S.
Columbia
Rd.














500,000


10

Grand
Forks

ND

Streets/Roads

Intersec3on
improvements
at
47th
Ave.
S.
and
Washington
St.














500,000


10

Grand
Forks

ND

Streets/Roads

Stanford
Rd.
concrete
panel
replacement
from
6th
Ave.
N.
to
University
Ave.














500,000


10

Grand
Forks

ND

Streets/Roads

8th
Ave.
N.
concrete
panel
replacement
from
3rd
St.
N.
to
Columbia
Rd.














560,000


11

Grand
Forks

ND

Streets/Roads

42nd
St.
N.
concrete
panel
replacement
from
27th
Ave.
N.
to
DeMers
Ave.














620,000


12

Grand
Forks

ND

Streets/Roads

40th
Ave.
S.
concrete
panel
replacement
from
Belmont
Rd.
to
Clearview
Dr.














650,000


13

Grand
Forks

ND

Streets/Roads

Classified
street
sign
replacement
at
controlled
intersec3ons














680,000


13

Grand
Forks

ND

Streets/Roads

13th
Ave.
S.
concrete
panel
replacement
from
Cherry
St.
to
Columbia
Rd.














900,000


18

Grand
Forks

ND

Streets/Roads

20th
St.
S.
concrete
panel
replacement
from
24th
Ave.
S.
to
DeMers
Ave.














900,000


18

Grand
Forks

ND

Streets/Roads

Cherry
St.
reconstruc3on
from
25th
Ave.
S.
to
47th
Ave.
S.












1,050,000


21

Grand
Forks

ND

Streets/Roads

Concrete
repair,
dowel
bar
retrofit,
grinding,
etc.,
at
DeMers
Ave.
from
5th
St.
to
Washington
St.












1,365,000


27

Grand
Forks

ND

Streets/Roads

15th
Ave.
S.
Reconstruc3on
from
49th
St.
to
52nd
St.
then
North
along
52nd
St.
to
12th
Ave.
S.












1,500,000


30

Grand
Forks

ND

Streets/Roads












1,500,000


30

Grand
Forks

ND

Streets/Roads

Construc3on
of
34th
St.
from
Ruemmele
Rd.
to
40th
Ave.
S.,
including
40th
Ave.
S.
from
Ruemmele
Rd.
to
38th
 Ave.
S. Downtown
Traffic
Signal
upgrades












1,700,000


34

Grand
Forks

ND

Streets/Roads

Columbia
and
Gatewaay
intersec3on
improvement












1,825,000


37

Grand
Forks

ND

Streets/Roads

Cherry
St.
reconstruc3on
from
17th
Ave.
S.
to
25th
Ave.
S.












1,950,000


39

Grand
Forks

ND

Streets/Roads

Columbia
Rd.
reconstruc3on
from
Overpass
to
11th
Ave.
S.












2,400,000


48

Grand
Forks

ND

Streets/Roads

Reconstruc3on
of
48th
St.
from
DeMers
Ave.
to
17th
Ave.
S.












3,000,000


60

Grand
Forks

ND

Streets/Roads

Box
culvert
along
48th
St.
from
17th
Ave.
S.
to
32nd
Ave.
S.












5,000,000


100

Grand
Forks

ND

Streets/Roads

S.
48th
St.
from
17th
Ave.
S.
to
32nd
Ave.
S.












7,900,000


158

Grand
Forks

ND

Transit

Bus
Garage
Reconstruc3on
and
Repair














500,000


10

Grand
Forks

ND

Water

34th
St.
Storm
sewer
from
Ruemmele
Rd.
to
the
S.
End
Drainway












1,000,000


10

Grand
Forks

ND

Water

Storm
Water
treatment
pond
on
new
southend
development












1,000,000


10

Grand
Forks

ND

Water

Relief
Storm
Sewer
from
Columbia
Rd.
to
English
Coulee
along
11th
Ave.
N.












1,500,000


15

Grand
Forks

ND

Water

Water
Treatment
plant
rehabilita3on












2,000,000


20

Grand
Forks

ND

Water

48th
St.
Lib
Sta3on
on
32nd
Ave.
S.
and
48th
St.












3,000,000


30

Grand
Forks

ND

Water

New
Landfill
development
and
associated
infrastructure
requirements










10,000,000


100

Lincoln

NE

CDBG












1,096,100


1.5

Lincoln

NE

CDBG

Stronger,
Safer,
Neighborhoods
Ini3a3ve:
Improvements
to
blighted
neighborhoods
with
installa3on
of
 streetlights,
street
trees,
and
gravel
alleys 4th
Street
lights
and
street
trees
in
a
low
income
neighborhood














300,000


2

Lincoln

NE

CDBG

North
Bofoms
Streetscape:
Project
iden3fed
in
the
Antelope
Valley
Redevelopment
Plan














350,000


2

Lincoln

NE

CDBG

Maf
Talbot
Kitchen:
Soup
kitchen
and
outreach
facili3es












1,750,000


3

Lincoln

NE

CDBG

Transi3onal
housing
for
homeless












3,000,000


5

Lincoln

NE

CDBG

Parks:
27
projects
in
20
parks,
ADA
accessibility,
playground
equipment,
sidewalks,
and
ligh3ng












1,500,000


8

Lincoln

NE

CDBG

Sidewalks:
5
neighborhoods,
could
be
and
ready
to
construct
in
3‐6
months












2,000,000


8

Lincoln

NE

CDBG

5
neighborhoods
surveyed
and
ready
to
construct












2,380,000


17

Lincoln

NE

CDBG

Street
Paving:
approx.
118
blocks










12,390,000


60

Lincoln

NE

Energy

Work
with
LES
to
provide
residen3al
and
commercial
energy
audit
program














150,000


Lincoln

NE

Energy

Technical
consultant
services
to
design
an
ac3ve
landfull
gas
recovery
system














600,000


0

Lincoln

NE

Energy

Technical
consultant
services
to
develop
a
sustainability
plan
for
City














250,000


0

Lincoln

NE

Energy














150,000


0

Lincoln

NE

Energy

Technical
consultant
services
to
review
City
building
codes
and
promote
sustainability
and
building
energy
 efficiency Solar
powered
fountain
pumps
at
4
loca3ons
















15,000


0.2

Lincoln

NE

Energy

Solar
cell
area
ligh3ng
parks
with
single
security
lights
















75,000


0.9

Lincoln

NE

Energy

Solar
panels/PVC
for
alternate
energy
supply
at
park
nature
center
















50,000


0.9

Lincoln

NE

Energy

Sprayground
effluent
reservoir
reuse
for
park
irriga3on
















50,000


0.9

Lincoln

NE

Energy

Wind
Turbine
Alterna3ve
Energy
Supply
for
Park
Nature
Center
















65,000


1.2

Lincoln

NE

Energy

Solar
panels/PVC
for
alternate
energy
supply
at
LPR
Admin.
building
















90,000


1.6

Lincoln

NE

Energy

Solar
area
ligh3ng
for
park














120,000


2.2

Lincoln

NE

Energy

Geothermal
conversion
for
HVAC
sytems
at
LPR
Admin.
building














250,000


4.5

Lincoln

NE

Energy

Solar
water
hea3ng
at
10
pool
facili3es














250,000


4.5

Lincoln

NE

Energy

Geothermal
Conversion
for
HVAC
systems
at
easterday
recrea3on
center














500,000


9

City

State

Program

Lincoln

NE

Energy

Lincoln

NE

Energy

Development
of
grant
fund
for
NGO's
to
assist
with
implemen3ng
the
energy
efficiency
and
conserva3on
 strategy
in
the
Sustainability
Plan Development
of
a
low
interest
revolving
loan
fund
for
energy
efficiency
and
conserva3on

Project
Descrip3on

Lincoln

NE

Energy

LEED
pla3num
cer3fied
building
construc3on
Golf
Clubhouse
replacement

Lincoln

NE

Housing

Lincoln

NE

Lincoln

Funding
Required

Jobs














640,000


17.5














640,000


37.5












3,000,000


54.1

Replace
roofs
at
Hansen
units














150,000


10

Housing

Replace
tub/showers
at
P‐30
units














150,000


20

NE

Housing

Install
aqc
insula3on
at
F‐39
units
















46,800


40

Lincoln

NE

Housing

Install
fire
sprinklers
at
Mahoney
Manor,
a
senior
high‐rise
building














400,000


125

Lincoln

NE

Housing

Remodal
community
room
and
kitchen
at
Mahoney
Manor
















50,000


150

Lincoln

NE

Public
Safety

Ballis3c
improvement
project














125,000


0

Lincoln

NE

Public
Safety

Crime
scene
inves3ga3on
mobile
unit














120,000


0

Lincoln

NE

Public
Safety

Digital
recording
and
transcrip3on














165,000


0

Lincoln

NE

Public
Safety

Forensic
lab
improvement
project














150,000


0

Lincoln

NE

Public
Safety

GPS
locators
for
patrol
cars
















71,000


0

Lincoln

NE

Public
Safety

Informa3on/intelligence
display
upgrade
















46,500


0

Lincoln

NE

Public
Safety

Mobile
command
post














216,000


0

Lincoln

NE

Public
Safety

Patrol
car
video
systems














852,000


0

Lincoln

NE

Public
Safety

Public
place
CCTV
enhancement
















80,000


0

Lincoln

NE

Public
Safety

Staffing
of
Police
Officers














486,000


9

Lincoln

NE

Streets/Roads

Traffic
Monitoring
Camera
Program:
Install
10
key
intersec3ons
to
improve
traffic
flow














100,000


1

Lincoln

NE

Streets/Roads












1,000,000


7

Lincoln

NE

Streets/Roads

Digital
Message
Sign
Program:
Install
16
intersec3ons
to
improve
traffice
communica3on
and
incident
 management,Funding
Required Traffic
Communica3on:
Install
fiber
and
conduit
for
10
projects
to
improve
traffice
flow
and
communica3on












1,100,000


8

Lincoln

NE

Streets/Roads

Traffic
Signal
Replacements:
replacement
of
20
intersec3ons
of
obsolete
equipment












2,800,000


20

Lincoln

NE

Streets/Roads

Arterial
Street
Rehabilita3onsImprovement
of
over
175
blocks
of
main
city
streets










19,400,000


136

Lincoln

NE

Transit

Replace
9
current
HandiVan
hybrid
vehicles












1,000,000


Lincoln

NE

Transit

Replace
current
HandiVan
diesel
vehicles

Lincoln

NE

Transit

Rehabilita3on
of
downtown
bus
shelter














215,000


10

Lincoln

NE

Water

Water
produc3on
system
construc3on
and
installa3on












2,000,000


14

Lincoln

NE

Water

Water
mains
construc3on












6,100,000


43

Lincoln

NE

Water

Wastewater
treatment












7,800,000


44

Omaha

NE

CDBG

Purchase
New
Pumper
Firetrucks












1,146,000


10

Omaha

NE

CDBG

Pedestrian/Street
Ligh3ng
and
Tree
Plan3ng
in
Central
Development
District














250,000


15

Omaha

NE

CDBG

Vinton
Street
Streetscape
project














100,000


20

Omaha

NE

CDBG

Park
Avenue
Streetscape
project














750,000


25

Omaha

NE

CDBG

42nd
&
Lake
Eagle
Nest
Infill
Houses












2,300,000


30

Omaha

NE

CDBG

North
24th
Street
Corridor
Improvements












1,500,000


30

Omaha

NE

CDBG

South
24th
Business
Corridor
Improvement
project












1,500,000


30

Omaha

NE

CDBG

16th
&
Yates
Infill
Townhouses












4,100,000


40

Omaha

NE

CDBG

Compressed
natural
gas
fueling
facility
and
vehicles












1,000,000


40

Omaha

NE

CDBG

North
Omaha
Human
Services
Campus
Empowerment
Center












3,700,000


40

Omaha

NE

CDBG

Scafered
Site
Affordable
Infill
Houseing












3,700,000


40

Omaha

NE

CDBG










29,950,000


45

Omaha

NE

CDBG

Asbestos
abatement
and
systems
structural/systems
renova3on
of
Central
Police
Headquarters.
This
building
 houses
police
administra3on,
all
detec3ve
and
support
opera3ons.
The
1970
building
is
in
cri3cal
need
of
 abatement
in
order
to
allow
con3nued
o Wintergreen/Myof
Park
Redevelopment
project












4,760,000


100

Omaha

NE

Energy












5,950,000


50

Omaha

NE

Housing

Purchase
180
flex
fuel‐E85
Ford
Crown
Victoria
Police
Interceptor,
15
GMC
or
equivalent
vehicles
and
convert
 three
city
fueling
sites
for
E‐85. Replace
Intercom
Systems
in
11
Tower
Buildings
serving
1406
Public
Housing
Units














350,000


5

Omaha

NE

Housing














160,000


6

Omaha

NE

Housing

Replace
roofing
at
2
Public
Housing
/
LIHTC
proper3es
containing
47
units
at

1234
South
13th
Street
and
305
 South
16th
Street
‐
Commercial
Grade
EPDM
membrane
roofing
 Replace
parking
lot
at
Kay
Jay
Tower
‐
Elderly
&
Disabled
Public
Housing
‐
117
units














250,000


7

Omaha

NE

Housing

Omaha

NE

Housing

Omaha

NE

Housing

Omaha

NE

Housing

Omaha

NE

Housing

Omaha

NE

Public
Safety

Omaha

NE

Public
Safety

Omaha

NE

Streets/Roads

Renova3ons
to
crown
Tower
‐
149
uints
of
elderly
disabled
housing
in
a
12
story
tower
building
‐
repalce
all
 windows,
brick
veneer,
install
new
unit
fan
coil
systems,
structural
shear
walls
to
all
exterior
walls,
repalce
 roofing
and
make
up
air
system. Fire
Sprinkler
System
Installa3on
and
Fire
&
Life
Safety
Upgrades
to
meet
current
code
requirements
at
7
OHA
 Tower
Buildings.
 Public
Housing
Scafered
Sites
General
Renova3ons
at
258
single
family
units
and114
duplex
units
to
include
 replacement
of
roofing,
siding,
guferes
&
downspouts,
grading,
concrete
sidewalks
&
driveways
&
retaining
 walls Development
of
an
electronic
records
management
system
to
replace
the
current
paper/physical
system.

This
 proposal
would
allow
the
police
department
to
upgrade
fuc3onality
and
use
befer
analysis
to
more
effec3vely
 address
crime
preven3on,
crime
serie Outdoor
Firearm
Range.
Need
to
close
a
small
range
in
a
suburban
area.
An
outside
range
is
necessary
for
 approved
training.
Range
would
include
25
&
150
meter
components,
range
tower,
classroom
and
access
road.
 Will
serve
mul3‐agency,
two
state
area.
It
 Improvements
to
Bridges
at
13th
Street
and
7th
Street

Omaha

NE

Streets/Roads

Omaha

NE

Omaha

NE

Public
Housing
Scafered
Sites
Sec3on
504
Improvements
to
45
units
to
meet
requirements
of
Voluntary
 Compliance
Agreement
‐
Uniform
Federal
Accessibility
Strandards Renova3ons
to
56
units
of
Project
Based
Sec3on
8
in
8
buildings
on
scafered
sites














584,000















900,000


9












4,291,488


40












5,500,000


50












8,000,000


80










24,062,795


140












1,875,000


12












2,987,000


18














115,000


15

Addi3on
to
the
Traffic
Shop














350,000


20

Streets/Roads

Elkhorn
Salt
Storage
Shed














825,000


20

Streets/Roads

Garage
for
Street
Sweepers














500,000


20

City

State

Program

Omaha

NE

Streets/Roads

North
Freeway
and
Sorensen
Parkway
project

Project
Descrip3on

Funding
Required 












600,000


Jobs 20

Omaha

NE

Streets/Roads

Safe
Routes
to
School
at
144th
&
Fort

Omaha

NE

Streets/Roads

Brine
Manufacturering
Facility














500,000


20












1,500,000


Omaha

NE

Streets/Roads

Street
Maintenance
Equipment
Storage
Facilty












1,500,000


25 25

Omaha

NE

Streets/Roads

108th
Street
–
“L”
to
“Q”
Street
project












1,500,000


30

Omaha

NE

Streets/Roads

132nd
Street
–
Blondo
Street
to
West
Maple
Road
reconstruc3on
project












5,540,000


30

Omaha

NE

Streets/Roads

156th
and
West
Center
Road
intersec3on
project












7,500,000


30

Omaha

NE

Streets/Roads

156th
Street
‐
West
Dodge
Rd.
to
Pacific
Street
reconstruc3on
project












4,500,000


30

Omaha

NE

Streets/Roads

90th
Street
‐
F
Street
to
L
Street
reconstruc3on
project












2,000,000


30

Omaha

NE

Streets/Roads

Farnam
Street
Rehabilita3on
‐
36th
Street
to
42nd
Street












2,000,000


30

Omaha

NE

Streets/Roads

Rebuild
“F”
Street
from
146th
Street
to
155th
Street












2,500,000


30

Omaha

NE

Streets/Roads

150th
and
West
Center
Road
bridge
project










12,000,000


40

Omaha

NE

Streets/Roads

16th
&
Jaynes
Street
Maintenance
Facility












6,000,000


40

Omaha

NE

Streets/Roads

Bridge
Rehabilita3on
at
Various
Loca3ons












1,000,000


40

Omaha

NE

Streets/Roads

New
Vehicle
Maintenance
Facility










10,000,000


40

Omaha

NE

Streets/Roads

Major
and
Residen3al
Street
Rehabilita3on
and
Resurfacing










11,600,000


60

Omaha

NE

Streets/Roads

Rebuild
Traffic
Signals












2,000,000


60

Omaha

NE

Streets/Roads

ADA
Street
Ramp
Installa3on
Project












5,000,000


80

Omaha

NE

Streets/Roads

Miscellaneous
Infrastructure
Rehabilita3on
Projects












1,000,000


80

Omaha

NE

Streets/Roads

Safety
and
Capacity
Improvements
at
Various
Loca3ons












4,250,000


100

Omaha

NE

Transit

Replace
obsolete
maintenance
equipment.














200,000


1

Omaha

NE

Transit

Replace
26‐year‐old
Administra3ve/Maintenance
Facility's
original
garage
doors.














283,120


2

Omaha

NE

Transit














774,360


4

Omaha

NE

Transit

Expand
video
surveillance
system
to
include
live
video
feed,
911
interface
and
ADA
compliant
annunciator
 system. Upgrade
Administra3ve/Maintenance
facility
phone
and
computer
systems.














899,360


4

Omaha

NE

Transit

Replace
9‐year‐old
refurbished
bus
washers
and
26‐year‐old
original
bus
vacuum
system.












2,315,600


5

Omaha

NE

Transit

Upgrade
security
systems
at
26‐year‐old
Administra3ve/Maintenance
Facility.












1,232,480


5

Omaha

NE

Transit

Rebuild
HVAC
and
air
systems
on
37
low‐floor
buses
to
reduce
maintenance
costs
and
improve
reliability.














506,900


6

Omaha

NE

Transit












2,071,200


10

Omaha

NE

Transit












2,399,360


10

Omaha

NE

Transit

Rebuild
37
low‐floor
bus
body's
deteriora3ng
infrastructure
and
associated
components
to
reduce
 mainetenance
costs
and
increase
safety. Replace
26‐year‐old
Administra3ve/Maintenance
Facility's
interior
and
exterior
ligh3ng
fixtures
with
energy
 efficient
fixtures
and
systems. Replace
16
paratransit
fleet
vehicles
that
have
exceeded
FTA's
Rolling
Stock
Useful
Life
Policy.












1,200,000


16

Omaha

NE

Transit












3,165,600


20

Omaha

NE

Transit

Upgrade
26‐year‐old
Administra3ve/Maintenance
Facility's
original
HVAC
and
air
handling
systems
for
energy
 efficiency.
 Increase/expand
transit
service.













3,517,846


21

Omaha

NE

Transit












3,418,800


25

Omaha

NE

Transit

Rebuild
37
low‐floor
bus
engines,
transmissions
and
sub‐systems
to
reduce
maintenance
costs
and
increase
 safety. Renovate
26‐year‐old
Administra3ve/Maintenance
Facility's
interior/exterior
structure.












3,899,210


30

Omaha

NE

Transit

Replace
47
transit
vehicles
that
have
exceeded
FTA's
Rolling
Stock
Useful
Life
Policy.

Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha Omaha
 Omaha
 Omaha


NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE NE

Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water Water CDBG CDBG Streets/Roads

Papillion
Creek
Computer
System
Backup
Generator Papillion
Creek
Engine
Generator
Wiring
Replacement Sanitary
Manhole
Rehabilita3on
Project Papillion
Creek
Secondary
Treatment
Rehabilita3on Stormwater
Inlet
Rehabilita3on
Project 1st
&
Leavenworth
Street
Lib
Sta3on
Improvements 24th
&
Ogden
Street
Combined
Sewer
Separa3on 42nd
&
X
Street
Combined
Sewer
Separa3on 72nd
&
Girard
Sanitary
Lib
sta3on
Decommission
Project 76th
&
F
Stormwater
Project 84th
&
F
Sanitary
Sewer
Rehabilita3on 96th
Street
Sanitary
Sewer
Capacity
upgrade Missouri
river
Digester
Piping
Modifica3ons Missouri
River
Floodwall
Closure
Project Missouri
River
Levee
Culvert
Rehabilita3on
Project Missouri
River
Sludge
Belt
Press
Replacement
Project Missouri
River
Solids
Dewatering
Facility
HVAC
Improvements Missouri
River
Solids
Dewatering
Facility
MCC
Project Monroe
Street
Check
Valve
Replacement
Project Ohern
Street
Grit
Facility
Odor
Control
and
Improvements Papillion
Creek
Sludge
Belt
Press
Replacement
Project Papillion
Creek
WWTP
Influent
Screen
Rehabilita3on Cole
Creek
Channel
Improvements Papillion
Creek
Primary
Clarifier
Rehabilita3on
Project Aksarben
Village
Sewer
Separa3on Papillion
Creek
Medium
Voltage
Upgrade
Project Storm
Channel
Rehabilita3on
Projects Papillion
Creek
Interceptor
Crossing
Repairs Monroe
Basin
Sewer
Separa3on Papillion
Creek
WWTP
digester
cover
replacement Webster
Street
combined
sewer
separa3on Missouri
River
Flood
Levee
Rehabilita3on
Project Cunningham
Lake
Trail
Installa3on City
Wide
Trail
and
Stream
Bank
Restora3on Walnut
Grove
Park
Road
and
Renova3on










16,294,000
 












100,000
 












150,000
 










1,000,000
 












600,000
 










2,000,000
 










1,200,000
 










2,000,000
 










1,400,000
 












300,000
 












615,000
 












300,000
 










3,000,000
 












200,000
 












250,000
 












300,000
 










1,500,000
 












400,000
 










1,400,000
 












300,000
 












600,000
 










1,000,000
 












800,000
 










2,000,000
 










2,000,000
 










3,000,000
 










2,000,000
 












800,000
 










1,200,000
 










6,000,000
 










5,000,000
 










8,000,000
 










2,100,000
 










2,200,000
 










4,500,000
 












735,000


47 10 10 12 15 15 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 20 25 25 30 30 30 35 40 40 50 65 30 50 20

City

State

Program

Omaha
 Omaha


NE NE

Streets/Roads Streets/Roads

Cunningham
Lake
Road
and
Parking
Renova3on Standing
Bear
Lake
Road
and
Parking
Renova3on

Project
Descrip3on

Funding
Required 










1,700,000


Jobs 30

Omaha


NE

Streets/Roads

Levi
Carter
Park
Road
and
Parking
Renova3on












1,600,000


30












2,100,000


Omaha


NE

Water

35

Carter
Lake
Watershed
Best
Management
Prac3ces












3,700,000


Clibon

NJ

Streets/Roads

30












1,300,000


Streets/Roads

Fairmount
Avenue,
Fernwood
Court,
Marilyn
Place,
Concord
Street,
and
Thomas
Street
roadway
and
drainage
 improvements. Improvements
to
various
streets
City‐wide.

Clibon

NJ

Clibon

NJ

Streets/Roads

Urma
Avenue
area
roadway
and
drainage
improvements












2,700,000


Clibon

NJ

Water

Mar3n
Avenue
Sanitary
Sewer
Pump
Sta3on
replacement














500,000


East
Orange

NJ

CDBG

Upgrade
Water
Pump
System

East
Orange

NJ

CDBG

Street
Reconstruc3on












1,300,000


85

East
Orange

NJ

CDBG

DPW
Garage












1,750,000


105

East
Orange

NJ

CDBG

Senior
Center












1,200,000


123

East
Orange

NJ

CDBG

Civic/Recrea3on
Center












2,300,000


135

East
Orange

NJ

CDBG

Rehab.
Old
Police
Facility












6,000,000


155

East
Orange

NJ

Energy

Upgrade
Hea3ng/Cooling
System












6,000,000


60

East
Orange

NJ

Energy

Energy
Retrofits
7
Public
Bldgs










11,000,000


160

East
Orange

NJ

Public
Safety

Combine
Fire/Police
Dispatch














900,000


12

East
Orange

NJ

Public
Safety

New
Public
Safety
Equipment












2,250,000


15

East
Orange

NJ

Public
Safety

New
Technologies












2,100,000


20

East
Orange

NJ

Public
Safety

Addi3onal
Police












4,500,000


25

East
Orange

NJ

Streets/Roads

Street
Total
Reconstruc3on
10
Streets












4,700,000


130

East
Orange

NJ

Water

Upgrade
Storm
Sewers












4,800,000


70

East
Orange

NJ

Water

Upgrade
Sanitary
Sewers












5,700,000


80

East
Orange

NJ

Water

Upgrade
Water
Infrastructure












6,000,000


100

edison


NJ

CDBG

affordable
housing
business
loans,
infrastructure
loans,
support
o
non
profits












5,000,000


25

edison


NJ

Energy

replace
old
inefficient
motor
fleet
with
hybrid
vehicles














5,000,000


20

edison


NJ

Energy

solar,
wind
and
energy
conserva3on
projects
throughtout
municipal
buildings
and
facili3es













6,000,000


20

edison


NJ

Housing

new
health
center
to
replace
current
one












5,000,000


10

edison


NJ

Housing

funding
to
support
affordable
housing
need
in
twp












8,000,000


20

edison


NJ

Housing

new
senior/community
center












8,000,000


25

edison


NJ

Public
Safety

new
fire
houses,
fire
trucks
and
police
cars














5,000,000


10

edison


NJ

Schools

improvements
to
historic
thomas
a.
ediosn
museum
and
tower










10,000,000


50

edison


NJ

Schools

new
and
rehab
schools
in
twp











57,000,000


125

edison


NJ

Streets/Roads

road
and
bridge
safety
improvements











20,000,000


50

edison


NJ

Transit

new
hybrid
bus
fleet
for
municipal
bus
service













1,000,000


10

edison


NJ

Water

sewer
and
water
projects
throughout
town










10,000,000


25

Elizabeth

NJ

CDBG

Library
Historic
Renova3on
‐
Interior














500,000


10

Elizabeth

NJ

CDBG

New
Outdoor
Two
Inground
Swimming
Pools












4,000,000


10

Elizabeth

NJ

CDBG

Public
Marina
Floa3ng
Docks














500,000


10

Elizabeth

NJ

CDBG

Roof
Repairs
‐
Erxleben
Center














500,000


10

Elizabeth

NJ

CDBG

Roof
Repairs
‐
Mickey
Walker
Recrea3on
Center














500,000


10

Elizabeth

NJ

CDBG

Roof
Repairs
‐
Miller
Recrea3on
Center














500,000


10

Elizabeth

NJ

CDBG

Roof
Repairs
‐
City
Hall












1,000,000


20

Elizabeth

NJ

CDBG

Roof
Repairs
‐
Police
HQ












1,000,000


20

Elizabeth

NJ

CDBG

Roof
Repairs
‐
Public
Library
‐
Broad
Street












1,000,000


20

Elizabeth

NJ

CDBG

Way‐Finding
Signage
Project












1,000,000


20

Elizabeth

NJ

CDBG

Elizabethport
Community
Health
Center












2,500,000


50

Elizabeth

NJ

CDBG

Broad
Street
Streetscape
Improvements












3,000,000


60

Elizabeth

NJ

CDBG

Elizabeth
Avenue
Streetscape
Improvements












3,000,000


60

Elizabeth

NJ

CDBG

Midtown
Streetscape












3,000,000


60

Elizabeth

NJ

CDBG

Library
Historic
Renova3on
‐
Exterior












4,000,000


80

Elizabeth

NJ

CDBG

New
Animal
Shelter












5,000,000


100

Elizabeth

NJ

CDBG

Rehabilita3on
Public
Parks












5,000,000


100

Elizabeth

NJ

CDBG

Road
Resurfacing
‐
Various
Streets










10,000,000


200

Elizabeth

NJ

CDBG

Midtown
Sewer
Improvements










11,000,000


220

Elizabeth

NJ

CDBG

Flood
Relief










35,000,000


700

Elizabeth

NJ

Energy

Solar
Program
Emergency
Response
Facility














500,000


10

Elizabeth

NJ

Energy

Solar
Program
Erxleben
Recrea3on
Center














500,000


10

Elizabeth

NJ

Energy

Solar
Program
Miller
Recrea3on
Center














500,000


10

Elizabeth

NJ

Energy

Solar
Program
DPW
Maintenance
Facility












1,000,000


20

Elizabeth

NJ

Energy

Solar
Program
Police
HQ












1,000,000


20

Elizabeth

NJ

Energy

Public
Works
Recycling
Facility












2,000,000


40

Elizabeth

NJ

Housing

Parking
Area
Repaving
at
Mravlag
Manor
















80,000


7

Elizabeth

NJ

Housing

Grounds
Improvements
at
Ford
Leonard














120,000


8

Elizabeth

NJ

Housing

Security
Cameras
at
Mravlag
Manor
















90,000


8

Elizabeth

NJ

Housing

Building
Facade
Repair
at
Kennedy
Arms














200,000


10

Elizabeth

NJ

Housing

Basement
Door
Replacement
&
Masonry
Restora3on
at
Mravlag
Manor














300,000


12

Elizabeth

NJ

Housing

Fire
Alarm
System
Replacement
at
Mravlag
Manor














650,000


15

Elizabeth

NJ

Public
Safety

Surveillance
Equipment
and
Fiber
Network














750,000


0












3,585,000















980,000


47

City

State

Program

Elizabeth

NJ

Public
Safety

Alcohol
Beverage
Control
Monitoring

Project
Descrip3on

Elizabeth

NJ

Public
Safety

Juvenile
Proba3on
and
Parole
Monitoring












1,200,000


10

Elizabeth

NJ

Public
Safety

Narco3cs
Enforcement
Officers












1,200,000


10

Elizabeth

NJ

Public
Safety

Police
Officers
to
Monitor
Surveillance
Equipment












1,200,000


10

Elizabeth

NJ

Public
Safety

School
Resource
Officers












1,200,000


10

Elizabeth

NJ

Public
Safety

Police
HQ
Upgrades












5,000,000


100

Elizabeth

NJ

Public
Safety

New
Firehouse
24‐26
South
Broad
Street










10,000,000


200

Elizabeth

NJ

Streets/Roads

ADA
Upgrades
‐
Public
Sidewalk
Curb
Ramps












2,000,000


40

Elizabeth

NJ

Streets/Roads

Intersec3on
Improvements












5,000,000


100

Elizabeth

NJ

Streets/Roads

Road
Resurfacing












5,000,000


100

Elizabeth

NJ

Streets/Roads

Upgrade
Traffic
Lights












5,000,000


100

Elizabeth

NJ

Streets/Roads

Front
Street
Movable
Bridge










10,000,000


200

Elizabeth

NJ

Streets/Roads

North
Avenue
Corridor
Improvements








150,000,000


3000

Elizabeth

NJ

Streets/Roads








177,000,000


3540

Elizabeth

NJ

Water

Improvements
to
Bridge
Street
Siphons












1,000,000


20

Elizabeth

NJ

Water

Summer
Street
Storm
Drainage
improvements












1,000,000


20

Elizabeth

NJ

Water

Upgrade
at
Trenton
Avenue
Pump
Sta3on












1,000,000


20

Elizabeth

NJ

Water

Weszield
Ave.
&
Elmora
Ave.
By‐Pass
Sewer












1,000,000


20

Elizabeth

NJ

Water

Mafano
Park
Pump
Sta3on
Rehabilita3on












2,000,000


40

Elizabeth

NJ

Water

Oakwood
Plaza
Sewers












2,000,000


40

Elizabeth

NJ

Water

South
Second
Street
Pump
Sta3on
Rehabilita3on












2,000,000


40

Elizabeth

NJ

Water

Cleaning
&
Lining
Water
Lines












5,000,000


100

Elizabeth

NJ

Water

Elizabeth
River
Flood
Control
Project
Rehabilita3on












5,000,000


100

Elizabeth

NJ

Water

Emergency
Sewer
Repairs












5,000,000


100

Elizabeth

NJ

Water

Kapkowski
Road
Sewer
Improvements










10,000,000


200

Elizabeth

NJ

Water

Verona
Avenue
Pump
Sta3on










10,000,000


200

Elizabeth

NJ

Water

Dowd
Avenue
Pump
Sta3on










40,000,000


800

Hamilton

NJ

Energy

Leeds
Program
Coordinator
to
promote
energy
efficient
construc3on
projects














105,000


1

Hamilton

NJ

Energy

Library
Solar
Power














125,000


1

Hamilton

NJ

Energy

Sewer
Plant
Methane
Gase
to
Electric














675,000


3

Hamilton

NJ

Public
Safety

Tac3cal
Surveillance
Systems
‐
SWAT
















30,000


1

Hamilton

NJ

Public
Safety

Byrne
Grant
&
Municipal
Court
Sessions
‐‐
to
adjudicate
cases














150,000


2

Hamilton

NJ

Public
Safety

Cops
‐
Gang
Response
Unit














510,000


5

Hamilton

NJ

Streets/Roads












2,899,750


93

Hamilton

NJ

Water

2010
Capital
Program
‐‐
Reconstruct
($150/lf)) RECONSTRUCT:
Wesleyan
Drive
(House
#44)
to
Edinburg
Road Emergency
Generator














210,000


3

Hamilton

NJ

Water

East
State
Street
Pump
Sta3on
Upgrade














325,000


5

Hamilton

NJ

Water

Elkton
Estates
Pump
Sta3on
Upgrade














225,000


5

Hamilton

NJ

Water

Pump
Sta3ons
Telemetry












1,700,000


7

Hamilton

NJ

Water

RBC
Odor
Control
and
Air
Filtra3on












2,700,000


15

Hamilton

NJ

Water

Sewer
Line
Replacements












3,500,000


26

Hamilton

NJ

Water












8,358,500


101

Irvington

NJ

CDBG














150,000


4

Irvington

NJ

CDBG














500,000


5

Irvington

NJ

CDBG














200,000


8

Irvington

NJ

CDBG














700,000


10

Irvington

NJ

CDBG

(Hamilton
Wastewater
U3lity
‐
Capital
Program
FY2008‐FY2009) RBC
Odor
Control
and
Air
Filtra3on
Project
‐
Final
Phase
($2,395,000,




20
Jobs) Treatment
Plant
De‐Watering
Screw
C Removal
and
Replacement
of
Underground
Storage
Tank
at
16th
Avenue
Public
Works
Garage.
The
township
 has
a
limited
supply
of
gas
and
oil
tanks.
The
current
underground
tank
is
unregistered
and
cannot
be
used
as
 per
State
of
NJ
regula3ons Repair
roof
of
Public
Works
Facility
on
Coit
Street.
This
ac3ve
public
works
facility
has
need
of
a
new
roof,
 which
is
an
urgent
project. Moderniza3on
of
the
Service
Men's
Clubhouse.
This
building
is
owned
by
the
Township.
It
provides
limited
use
 to
the
Township
in
its
current
unsafe
condi3on.
Its
repair
was
designed,
but
lack
of
funding
forestalls
its
repair.
 The
building
will
be
used
as New
Fire
Training
Tower:
This
project
will
build
a
tower
to
be
used
as
fire
suppression
training
by
the
Fire
 Department.
This
project
has
been
designed
and
is
ready
to
be
constructed New
trailblazing
system
through
the
Irvington
Center
and
along
major
principal
arterials














800,000


10

Irvington

NJ

CDBG














250,000


10

Irvington

NJ

CDBG












2,500,000


10

Irvington

NJ

CDBG












1,500,000


15

Irvington

NJ

CDBG












4,000,000


15

Irvington

NJ

CDBG












1,000,000


20

Irvington

NJ

CDBG














600,000


20

Irvington

NJ

CDBG












1,500,000


20

Irvington

NJ

CDBG












1,000,000


20

Realign
20th
Avenue
at
Ellis
Avenue.
This
project
would
remove
a
dangerous
intersec3on.
It
would
provide
 safety
in
a
designated
redevelopment
area
where
housing
development
is
taking
place. Repair
of
the
Elizabeth
River
Channel.
This
channel
courses
through
the
Township.
Its
walls
are
weak
and
 broken. Nye
Avenue
Municipal
Parking
Garage
and
Plaza.
Expand
the
Twp
owned
parking
garage
and
create
a
public
 use
plaza
that
connects
the
garage
to
Clinton
Avenue
a
principal
arterial
that
services
the
NJ
Transit
Bus
 Terminal. Rehabilita3on
of
the
Orange
Sanitaty
Sewer
System.
This
system
is
deteriora3ng
and
is
collapsing
in
sec3ons
to
 the
extent
that
the
Township
has
to
incur
emergency
repairs.
New
piping
and
fill
will
modernize
and
expand
its
 sanitary
sewer
capacity. ADA
reconstruc3on
of
entrances
to
the
Twp
building Mill
Road
Streetscape:
This
project
will
improve
the
streetscape
of
a
road
that
connects
the
Garden
State
 Parkway
to
a
redevelopment
area
and
will
provide
transit
and
auto
access
to
the
site.
This
area
will
develop
 two
mixed
use
projects.
Both
are
undergo New
Fire
Sta3on/Emergency
Opera3ng
Center:
This
project
will
build
a
state‐of‐the‐art
for
emergency
fire
 response
and
for
regional
training
involving
other
deparments
in
nearby
municipali3es. Rehabilita3on
of
Public
Safety/Municipal
Court
complex
including
new
floorplan
and
upgrade
jail
and
court
 room.

Funding
Required 












600,000


Jobs 6

City

State

Program

Irvington

NJ

Energy

Irvington

NJ

Public
Safety

Irvington

NJ

Public
Safety

Irvington

NJ

Irvington Irvington

Project
Descrip3on

Funding
Required

Jobs

Energy
retrofits
of
the
Gatling
Recrea3on
Center:
new
windows,roof
solar
panels,
new
energy
efficient
ligh3ng,
 hea3ng
and
air
condi3oning.
This
is
an
ac3vely
used
recrea3on
center
and
is
cos3ng
the
Twp
with
inefficient
 energy
consump3on. New
CAD/CPLIMS
criminal
repor3ng
system
with
personnel














200,000


10














100,000


2












2,200,000


3

Public
Safety

Geographic
Informa3on
System
with
personnel.
Purchase
aerials,
mapping
engine,
applica3ons
for
use
in
data
 collec3on
and
analysis Hire
10
police
officers














900,000


10

NJ

Public
Safety

new
Gang
Response
Unit














900,000


10

NJ

Schools












2,000,000


10

Newark

NJ

Amtrak












1,000,000


25

Newark

NJ

Amtrak










45,000,000


100

Newark

NJ

CDBG












1,500,000


5

Newark

NJ

CDBG














500,000


5

Newark

NJ

CDBG












2,300,000


10

Newark

NJ

CDBG














500,000


10

Newark

NJ

CDBG












2,300,000


10

Newark

NJ

CDBG












1,400,000


13

Newark

NJ

CDBG












2,500,000


15

Newark

NJ

CDBG












2,500,000


15

Newark

NJ

CDBG

Rebuild
the
high
school
football/track
field
to
professional
standards.
The
current
field
is
aged
and
worn.
The
 track
field
is
undersized. The
AMTRAK
Railroad
is
presently
located
parallel
to
State
Route
21,
a
north
to
south
corridor
in
the
City
of
 Newark.

The
railroad
is
an
overhead
travel
corridor
separa3ng
the
City's
East
Ward
and
Central
Ward
 communi3es.

Poor
ligh3ng
or
non
existent The
McClellan
Street
Underpass
is

located
in
the
City
of
Newark's
South
Ward,
which
provides
access
to
the
 Newark‐Liberty
Interna3onal
Airport.

The
underpass
allows
passage
under
the
AMTRAK
Railroad
on
the
 Northeast
Corridor.

 Grace
West
Firehouse
Historic
Preserva3on
Project‐
Restora3on
and
preserva3on
of
abandoned
turn‐of
the
 century
fire
house.

Currently
in
design/development Ligh3ng
Improvements
to
Major
Corridors
Project
‐‐
Provide
consistent
ligh3ng
for
both
sides
for
the
length
of
 two
major
corridors:
Bloomfield
Avenue
and
Springfield
Avenue Downtown
District
Streetscape
Project:
Covers
equipment
purchase Total
Equipment
Purchase,
Wiring,
and
Engineering
Cost:
$2.3
million Addi3onal
Yearly
Fixture
Lease
and
Power
Consump3on
Cost:
$180,000/year Commitment
made
by
previous
adminis MLK
Homes
First
Time
Homebuyer‐
Assistance
in
LMI
first
3me
homebuyer
for
neighborhood
revitaliza3on
 project West
Ward
Abandoned
Property
Public
Facili3es‐
Street,
traffic
calming,
sidewalk
improvements
planned
and
 pending
design.

Community
gardens
designed 862
S.
Orange
Avenue
–
Nonprofit
rehabilita3on
of
10
unit
building
and
economic
development,
job
training
 center KBS
–
Acquisi3on/Predevelopment
–
Non‐profit
neighborhood
revitaliza3on
in
area
with
blighted
designa3on.

 Includes
acquisi3on
funds,
predevelopment
costs
that
can
be
commifed
prior
to
90
days Lincoln
Park
South
Park
Presbyterian
Church
Facade 3‐phase
project
by
Lincoln
Park
Coast
Cultural
District
(LPCCD) Emergency
Stabiliza3on Historic
Restora3on Construc3on
of
Amphitheater Total
project
cost:
$4
M
LPCCD.

has
secured
$1.5
M
from Meeker‐
Elizabeth
Rehabilita3on
–
Rehabilita3on
of
mixed‐use
building












2,000,000


15

Newark

NJ

CDBG












6,265,000


15

Newark

NJ

CDBG












2,500,000


15

Newark

NJ

CDBG












2,000,000


15

Newark

NJ

CDBG










10,000,000


20

Newark

NJ

CDBG












7,000,000


20

Newark

NJ

CDBG












5,000,000


20

Newark

NJ

CDBG












1,000,000


26

Newark

NJ

CDBG












2,100,000


65

Newark

NJ

CDBG












3,500,000


65

Newark

NJ

CDBG












2,500,000


65

Newark

NJ

CDBG

Newark

NJ

CDBG

BAT
Lobs
–
Rehabilita3on
and
Commercial
Development.

Commercial
por3on
of
mul3family,
mixed
income
 project CHEN
School
–
Development
of
new
day
care,
mixed
use
building
for
nonprofit
use,
public
facili3es.

Project
 currently
in
design/development
phase Restored
Homes
‐
First
Time
Homebuyer
and
Suppor3ve
Housing.

Project
includes
rehabilita3on
of
abandoned
 structure
and
special
needs
housing.

Has
site
plan
approval
and
can
proceed
with
bidding Roseville
Commons
–
New
mul3family
housing.

Project
has
site
plan
approval,
and
construc3on
contracts
have
 been
bid.

Nonprofit
sponsor
in
blighted
area
makes
project
CDBG
eligible Mul3family
Assisted
Housing
Capital
Improvement
Program

Newark

NJ

CDBG

Acquisi3on
of
real
property
for
Minish
Park
project:

Miscellaneous
Unfunded
2008
CDBG
Public
Facili3es
Projects
from
applica3ons
submifed
by
local
nonprofit
 organiza3ons
throughout
the
City
of
Newark West
Ward
Abandoned
Property
Acquisi3on/Demoli3on–
Acquisi3on
of
approximately
25
private
abandoned
 proper3es.

Proper3es
iden3fied
and
acquisi3on
in
process West
Ward
Ini3a3ve
Public
Improvements
Project:
 Improvements
to
West
Ward
Ini3a3ve
Target
Area
from

South
9th
Street
to
South
12th
Street
and
from
South
 Orange
Avenue
to
Central
Avenue. Infrastructure
improvements:
sidewalk
repairs,
curbs,
fen Broad
Street
Sta3on
Infrastructure
Project:
Infrastructure
Improvements
to
leverage
hundreds
of
millions
of
 dollars
for
private
investment Demoli3on
of
public
facili3es Reloca3on
of
the
Police
and
Fire
Departments
currently
on
Orange
Street Downtown
Parking
Garage Stand‐alone
garage
near
Broad
Street
Sta3on
or
Military
Park 250
spaces
at
$27,600/space
 Should
be
managed
to
be
used
24/7 Office/Retail
during
the
day Residen3al/Entertainment
at
night Broad
Street
Sta3on
Proximate Newark
Gateways
Project
‐
The
City
of
Newark
has
iden3fied
27
gateways
which
will
all
undergo
a
prior3za3on
 process
to
determine
gateways
merit
early
ac3on
for
revi3liza3on ORR
Apartments
–
Rehabilita3on
of
21
unit
abandoned
building












4,500,000


65










40,000,000


120










25,000,000


150

1.
Minish
Park
Phase
1A
–
Jefferson
to
Jackson
St
(2.8
acres)
‐‐$4,500,000‐6,000,000 2.
RAR
acquisi3on
(5.16
acres)
‐‐
$8,000,000 3.
Minish
Park
Phase
1B
–
Jackson
St
to
Oxford
St
(3.82
acres

City

State

Program

Newark

NJ

CDBG

Project
Descrip3on

Newark

NJ

Energy

Newark

NJ

Energy

Newark

NJ

Energy

Newark

NJ

Energy

Newark

NJ

Energy

Transit
Project:
Newark
Elizabeth
Light
Rail

Newark

NJ

Housing

REAC
‐
Authority‐wide
Flooring
deficiency
correc3ons

Newark

NJ

Housing

REAC
‐
Authority‐wide
Misc.
Hazards
deficiency
correc3ons

Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark Newark

NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ NJ

Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Housing Public
Safety Schools Streets/Roads

Newark

NJ

Streets/Roads

Newark

NJ

Streets/Roads

Newark

NJ

Streets/Roads

Newark

NJ

Water

Newark

NJ

Water

Newark

NJ

Water

Newark

NJ

Water

REAC
‐
Authority‐wide
Electrical
deficiency
correc3ons REAC
‐
Authority‐wide
Lock/Hardware
deficiency
correc3ons REAC
‐
Authority‐wide
Door
deficiency
correc3ons REAC
‐
Authority‐wide
Kitchen
Appliance
deficiency
correc3ons REAC
‐
Authority‐wide
Window
deficiency
correc3ons Senior
Devt's
‐
(Vacant)
Apartment
Turnovers
 REAC
‐
Authority‐wide
Mold/Air‐Quality
Abatements Senior
Devt's
‐
Roof
Replacements REAC
‐
Authority‐wide
Kitchen
Cabinet
deficiency
correc3ons Family
Devt's
Fire
Preven3on/Detec3on
Systems
 Family
Devt's
Appliance
Renewal/Upgrades Senior
Devt's
‐
Exterior
(Site)
Renova3ons Family
Devt's
Secure
Entryway
Enhancements REAC
‐
Authority‐wide
Bathroom
deficiency
correc3ons Gigs
Foushee
Senior
Tower
HVAC
Improvements
 Senior
Devt's
‐
Entryway
improvements Terrell
Homes
(Family
Dev't)
‐
Major
Electrical
Upgrades Family
Devt's
Site
Improvements
 Townhouse
Devt's
‐
(Vacant)
Apartment
Turnovers
 Townhouse
Devt's
‐
Periodic
Pain3ng
Program Senior
Devt's
‐
Facades
‐
Tuckpoin3ng
/
Lintel
/
Parapet
Repairs Family
Devt's
Accessibility
Improvements
(ADA) Senior
Devt's
‐
Environmental
Remedia3ons
‐
LBP,
ACM,
PCB Townhouse
Devt's
‐
Roof
Replacements The
City
of
Newark
Police
Department’s
COPS
project
includes
hiring
50
police
officers
to
complement
our
 The
Newark
Public
Schools
is
engaged
in
a
Long‐Range
Facili3es
Plan
to
replace
or
renovate
many
of
its
exis3ng
 Broad
Street
is
appropriately
named
for
a
number
of
reasons.

Besides
its
substan3al
length
and
width,
it
acts
 as
a
primary
visual
and
physical
corridor
link
between
Route
21
to
the
south
and
Bloomfield
Avenue
to
the
 north.

 The
City
of
Newark
is
currently
engaged
in
final
prepara3on
for
the
construc3on
of
the
Ferry
Street
 Beau3fica3on.
This
project
seeks
to
improve
aesthe3cs
and
safety
within
the
East
Ward
by
providing
a
 pedestrian
friendly
thoroughfare
 The
City
of
Newark
is
currently
engaged
in
final
prepara3on
for
the
construc3on
of
the
East
Ferry
Street
 reconstruc3on.
This
project
seeks
to
improve
aesthe3cs
and
safety
within
the
East
Ward

area
residents,
 pedestrian
and
vehicular
traffic
friendly
 Improvement
of
exis3ng
Conrail
bridge
on
Avenue
P
will
provide
adequate
overhead
clearance
for
truck
 movements.
The
Avenue
P
bridge
is
an
overhead
railroad
bridge
now
u3lized
by
Conrail
to
distribute
and
 collect
products
of
nearby
industries.
 Rehabilita3on
of
Meadowlands
Storm
Water
Pump
Sta3on.

The
Meadowlands
storm
water
pumping
sta3on
 pumps
the
Peripheral
Ditch
surrounding
the
airport
which
receives
water
from
various
ditches
and
sewer
 ouzalls.

The
pump
sta3on
is
in
need
of
rehabilit Rehabilita3on
of
Storm
Sewer
Manholes
and
Catch
Basins
and
Storm
Water
Catch
Basin.

This
project
involves
 the
replacement
of
collapsing
block
manholes,
cast
iron
cas3ng
and
manhole
covers.

We
have
determined
 over
250
manholes
require
rehabilita3on
to Replacement
of
Obsolete
Fire
Hydrants.

There
are
some
400
old
style
fire
hydrants
in
the
system
that
must
be
 replaced
in
order
to
provide
proper
and
adequate
fire
flow
coverage
in
the
City Replacement
of
Water
Main
Gate
Valves.

There
are
many
water
gate
valves
in
the
water
system
that
are
over
 125
years
old
and
not
func3oning.

Some
valves
are
broken
in
either
the
open
or
closed
posi3ons.

When
there
 is
a
need
to
shut
valves
to
deal
with

LPCCD
–
Non‐profit
sponsor
in
neighborhood
revitaliza3on
area,
eligible
new
construc3on
ac3vity.

Also,
 predevelopment,
eligible
homebuyer
assistance
ac3vity.

Phase
II
has
site
plan
approval,
Phase
III
approval
 pending As
a
green
ini3a3ve,
and
in
conjunc3on
with
PSE&G,
the
City
of
Newark
will
use
solar
energy
to
light
public,
 city‐owned
buildings
and
street
lights. In
addi3on,
the
regular
cobra
head
street
light
fixtures
will
be
replaced
by
induc3on
light
fixtur Residen3al
Project: A.

Integra3ng
energy
efficiency
into
exis3ng
First
Time
Homeowner
Rehab
Assistance,
Senior
Rehab
 Assistance,
and
incen3vizing
others B.

Incen3vizing
owners
of
mul3‐family
proper3es
and
investment
proper3es
to
par3cipate
in Municipal
Project:
 A.

Energy
Master
Plan
–
to
enhance
the
City’s
long
term
sustainability
and
create
a
blueprint
to
guide
public
 and
private
investment.
 B.

Facility
conserva3on
audits
(energy,
water
&
waste
water,
building
condi3ons)
of
municipal
 Commercial: A.

Small
and
mid
size
business
–
as
part
of
exis3ng
business
reten3on
and
expansion
 B.

Large
Users C.

Commercial
property
owners
 D.

Sewage
Treatment
facili3es,
hospitals
and
non‐profits


Funding
Required

Jobs










15,000,000


195












5,000,000


100










13,200,000


100








115,700,000


400












5,700,000


1000








694,000,000
 20000














293,625


4














238,500
 












318,000
 












313,100
 












803,000
 












909,000
 












966,250
 










1,511,000
 










1,598,100
 










1,630,000
 










2,212,200
 










2,380,000
 










3,650,000
 










3,690,900
 










3,870,000
 










4,192,000
 










4,340,000
 










4,475,000
 










4,570,000
 










5,700,000
 










6,450,000
 










6,720,000
 










8,450,000
 








11,075,000
 








13,700,700
 








20,600,000
 










1,630,782
 








50,000,000


4 5 5 12 13 14 22 23 24 33 35 54 54 57 62 64 66 67 84 95 99 124 163 201 303 50 500












7,000,000


30












5,000,000


30












5,500,000


40












7,000,000


60












1,000,000


10












2,275,000


20












1,800,000


25












3,000,000


30

City

State

Program

Newark

NJ

Water

Newark

NJ

Water

Newark

NJ

Water

Orange

NJ

Orange

Project
Descrip3on

Funding
Required

Jobs

CDBG

Cleaning
and
Lining
of
Old
Cast
Iron
Water
Mains.

This
will
improve
flow
though
the
system
and
improve
water
 quality Replacement
and
Upgrading
of
Obsolete
4‐inch
Water
Mains
to
6
and
8‐inch
Water
Mains.

Four
inch
water
 mains
are
not
effec3ve
for
fire
figh3ng
and
cannot
deliver
the
needed
water
flow
for
the
areas.
 Replacement
of
Lead
Water
Services
from
the
Street
Water
Main
to
the
Water
Meter.

There
are
some
12,000
 exis3ng
lead
water
service
pipes
in
the
City.

These
services
have
the
poten3al
of
having
lead
leach
into
the
 served
facili3es
 Main
Street
Signage
including
Gateways,
Way
Finding
&
Displays

NJ

CDBG

Road/Street
Improvements












2,000,000


7

Orange

NJ

CDBG

Business
Training
Programs












1,000,000


10

Orange

NJ

CDBG

Orange
Library
Rotunda
Restora3on
&
Landscaping












2,500,000


10

Orange

NJ

CDBG

Public
Parking
Lots
Resurfacing
&
Beau3fica3on
for
Main
Street












3,000,000


10

Orange

NJ

CDBG

City
Hall
Interior
&
Exterior
Renova3on
including
HVAC,
Rewiring
&
Servers












5,000,000


20

Orange

NJ

CDBG

Streetscape
for
Central
Ave
Scotland
Road
Thoroughfares












5,000,000


20

Orange

NJ

CDBG

City
Park
Improvements
including
Aqua3cs
Center










10,000,000


30

Orange

NJ

CDBG

Expansion
&
Upgrade
of
10
Small
To
Medium
Businesses












5,000,000


50

Orange

NJ

CDBG

Public
Library
Renova3on










10,000,000


50

Orange

NJ

Energy

Solar
Panels
on
the
Orange
Reservoir
for
Renewable
Energy
Source










50,000,000


25

Orange

NJ

Energy

Energy
Efficient
Retrofit
of
City
Owned
Buildings












5,000,000


50

Orange

NJ

Housing

Demoli3on
of
Two
Public
Housing
Complexes












1,500,000


25

Orange

NJ

Housing

Construc3on
of
New
Senior
Housing
Facility










10,000,000


50

Orange

NJ

Public
Safety

Six
New
Fully
Equipped
Police
Vehicles














216,000


0

Orange

NJ

Public
Safety

Computer
Aided
Dispatch
(CAD)
System














270,000


5

Orange

NJ

Public
Safety

IT
Overhaul














200,000


5

Orange

NJ

Public
Safety

Reverse
911
System














250,000


5

Orange

NJ

Public
Safety

Video
Monitoring
System
at
Police
Headquarters














265,000


5

Orange

NJ

Public
Safety

City‐Wide
Camera
Monitoring
System












1,000,000


25

Orange

NJ

Schools

Orange
High
School
mobility
elevator
















75,000


10

Orange

NJ

Schools

Forest
St.
floor
3les
replacement














142,000


38

Orange

NJ

Schools

Central
School
floor
3les
replacement














131,000


42

Orange

NJ

Schools

Heywood
Ave.
School
floor
3les














130,000


60

Orange

NJ

Schools

Administra3on
Bulding
roof
replacement














175,000


75

Orange

NJ

Schools

Orange
Middle
School
stair
replacement














125,000


80

Orange

NJ

Schools

Orange
High
School
generator
replacement














375,000


105

Orange

NJ

Transit

Train
Shufle
from
Various
Points
in
the
City














500,000


3

Orange

NJ

Transit

Improve
the
Tony
Galento
Plaza
at
Orange
Train
Sta3on














250,000


10

Orange

NJ

Transit

Exterior
Improvements
for
the
Highland
Avenue
Train
Sta3on












1,500,000


15

Orange

NJ

Water

Replacement
of
the
Chestnut
Street
Pump
Sta3on










11,000,000


50

Piscataway

NJ

CDBG

Kennedy
Library
Expansion












1,500,000


15

Piscataway

NJ

CDBG

Public
Works
Expansion












2,500,000


15

Piscataway

NJ

CDBG

Senior
Center
Expansion












3,000,000


15

Piscataway

NJ

CDBG

Community
Center










16,000,000


125

Trenton

NJ

Amtrak

Railroad
Bridge
Project
‐
renova3on
of
three
city
bridges
along
the
Northeast
Corridor
train
line










35,000,000


350

Trenton

NJ

CDBG












1,000,000


10

Trenton

NJ

CDBG

North
Clinton
Avenue
Library/Community
Center
‐
moderniza3on
of
current
library
and
crea3on
of
community
 space
at
that
loca3on Trenton
Club
Renova3on
Project
‐
construc3on
of
coeduca3onal
exercise
facility














500,000


10

Trenton

NJ

CDBG












2,000,000


20

Trenton

NJ

CDBG












2,000,000


20

Trenton

NJ

CDBG












2,000,000


20

Trenton

NJ

CDBG












1,800,000


20

Trenton

NJ

CDBG

Vista
Center
Street
Project
‐
storm
drainage
reloca3on,
sewer
reloca3on
and
intersec3on
improvements
next
 to
Trenton
Train
Sta3on Maintenance
of
City
Owned
Buildings
‐
Neighborhood
Stabiliza3on
Program
to
eradicate
blight












2,000,000


25

Trenton

NJ

CDBG

New
Municipal
Court
Project
‐
conversion
of
retail
complex
for
reloca3on
of
municipal
court
opera3ons












4,000,000


40

Trenton

NJ

CDBG

Port
of
Trenton
Museum
‐
reconstruc3on
of
historic
building
into
a
mari3me
musuem












4,000,000


40

Trenton

NJ

CDBG

Canal
Banks
Commercial
Development
‐
crea3on
of
neighborhood
retail
space












2,000,000


45

Trenton

NJ

CDBG












4,000,000


70

Trenton

NJ

CDBG












1,600,000


72

Trenton

NJ

CDBG

Capitol
City
Partnership
Project
‐
ligh3ng
and
streetscape
improvements
to
promote
public
safety
and
private
 sector
investment
for
mixed
use
neighborhood
next
to
State
House Magic
Marker
Road
Construc3on
‐
infrastructure
development
at
a
former
brownfields
site
converted
to
 residen3al
community Construc3on
of
a
new
consolidated
Public
Works
Facility












8,000,000


80

Trenton

NJ

CDBG

Shiloh
CDC
Training
Facility
‐
conversion
of
industrial
facility
into
neighborhood
life
center












5,000,000


85

Trenton

NJ

CDBG

Trenton
YMCA
Project
‐
par3al
funding
to
assist
in
the
construc3on
of
a
$20
million
YMCA
facility












6,000,000


85

Trenton

NJ

CDBG

Museum
of
Contemporary
Science
‐
crea3on
of
a
science
musuem
at
a
former
industrial
site










30,000,000


305

Trenton

NJ

Energy

City
Buildings
Retro‐fiqng
Project
‐
retro‐fit
city
buildings
into
more
energy
efficient
facili3es










12,000,000


120

Trenton

NJ

Energy

Trenton
Microload
Project
‐
installa3on
of
solar
panels
on
750
residen3al
units










45,000,000


450

Trenton

NJ

Housing

Public
Housing
Interior
Renova3on
Project
‐
interior
improvements
to
140
housing
units












2,400,000


24

Trenton

NJ

Housing

Campbell
Homes
Renova3on
Project
‐
renova3ons
to
the
interior
and
exterior
of
24
public
housing
units












5,500,000


55

Trenton

NJ

Housing












3,500,000


60

Trenton

NJ

Housing

Senior
Grant
Program
‐
funding
for
an
emergency
repair
program
for
senior
ci3zens
to
bring
their
units
up
to
 code
using
local
minority
contractors

 Public
Housing
Renova3on
‐
renova3ons
to
the
interior
and
exterior
of
159
housing
units












9,000,000


90

Conversion
of
Old
Dickinson
facility
into
Modern
Library
‐
conversion
of
East
Trenton
historic
buiding
into
a
fully
 func3oning
library Eagle
Tavern
Development
‐
interior
improvements/upgrades
of
landmark
building
for
future
use
as
a
 restaurant
or
office
building Municipal
Street
Reconstruc3on
‐
municipal
roads,
sidewalks
and
intersec3on
improvements










10,000,000


50










10,000,000


50










12,000,000


50








250,000,000


5

City

State

Program

Trenton

NJ

Public
Safety

Police
Technology
Upgrades
‐
upgrades
to
the
police
equipment

Project
Descrip3on

Funding
Required 










3,000,000


Jobs 30

Trenton

NJ

Public
Safety

Trenton

NJ

Schools

Radio
Communica3on
Systems
Project
‐
radio
communica3on
improvements
to
the
Police
Department












3,000,000


30

Trenton
Public
Schools
Building
Rehabilita3on
and
System
Replacements












1,100,000


Trenton

NJ

Streets/Roads

20

South
Warren
and
Market
Street
Boulevard
Project
‐
reconstruc3on
and
realignment
of
South
Warren
and
 Market
Streets
into
a
boulevard Route
29
Boulevard
Break‐out
Project
‐
Improvements
to
the
intersec3on
of
Bridge
and
Ferry
Streets

Trenton

NJ

Transit












5,300,000


50














400,000


Trenton

NJ

Transit

4

Trenton

NJ

Transit

Trenton

NJ

Water

Trenton

NJ

Water

Alamogordo

NM

Airport

Alamogordo

NM

Airport

Alamogordo

NM

Airport

Alamogordo

NM

Airport

Alamogordo

NM

Airport

Alamogordo

NM

Energy

Alamogordo

NM

Housing

Alamogordo

NM

Public
Safety

Plaza
Hacienda
Public
Housing
Authority
complex,
an
electrical
upgrade
to
new
breaker
boxes,
panels,
and
 individual
meters,
and
the
installa3on
of
new
overhead
distribu3on
lines
and
transformers DPS
equipment:
Radio
and
repeater
equipment
replacement
program
to
meet
new
FCC
standards

Alamogordo

NM

Public
Safety

Alamogordo

NM

Alamogordo

Downtown
Trolley
Shufle
‐
lease
of
two
energy
efficient
trolleys
to
and
from
Trenton
train
sta3on
and
Office
 Complex Route
29
Boulevard
Break‐out
Project
‐
Reconnec3on
of
Memorial
Drive














600,000


6












1,000,000


10












4,500,000


45










15,000,000


150












2,500,000


2












1,500,000


2












3,000,000


3










10,000,000


10










10,000,000


10














200,000


1












2,000,000


4














700,000


0

Fire
Sta3on
#8
‐
construct
a
new
fire
sta3on
on
the
northwest
side
of
town














800,000


3

Streets/Roads

Addi3on
to
the
mul3‐purpose
fitness
trails,
which
loop
all
major
City
services.
8’
wide
asphalt
path
















75,000


0

NM

Streets/Roads

9th
Street
drainage
bridge
re‐build,
to
re
open
9th
Street.















150,000


1

Alamogordo

NM

Streets/Roads

City
entry‐way
streetscape
beau3fica3on
and
welcome
signs














100,000


1

Alamogordo

NM

Streets/Roads

Hooser
Park
Deten3on
pond
for
drainage

















70,000


1

Alamogordo

NM

Streets/Roads

1st
Street
realignment
west
of
White
Sands
Blvd
to
the
Relief
Route,
par3ally
completed














500,000


3

Alamogordo

NM

Streets/Roads

Desert
Lakes
Road
to
Dr.
Mar3n
Luther
King
Drive
Roads
Improvement,
road
construc3on
to
cross
US
Hwy
54














400,000


3

Alamogordo

NM

Streets/Roads

Intersec3on
of
Florida
Avenue
and
Fairgrounds
Road














440,000


3

Alamogordo

NM

Streets/Roads

ADA
corridors
con3nuing
arterials,
throughout
town













1,000,000


4

Alamogordo

NM

Water

Waste
Water
Treatment
Plant
plan/
design












1,500,000


0

Alamogordo

NM

Water

Reclaimed
Water
Distribu3on
&
Storage,
treated
water
irriga3on
system

Albuquerque

NM

Airport

Albuquerque

NM

Albuquerque

NM

Albuquerque

Broad
and
Warren
Street
Culvert
‐
Dayligh3ng
of
the
Assunpink
Creek
culvert
between
Warren
and
Broad
 Streets Water
Reservoir
Cover
Project
‐
crea3on
of
city
reservoir
cover
for
the
reduc3on
of
microbial
pathogens
in
 drinking
water Renova3ons
and
Expansion
of
the
Airport
Terminal,
including
the
addi3on
of
a
second
floor
and
handicap
 access
to
the
second
floor Security
Upgrades
to
Airport
Infrastructure
‐
Addi3onal
Perimeter
Fencing,
Motorized
Gates,
Computerized
 Card
Access
System,
Security
Cameras
(airport
wide),
terminal
security
system,
perimeter
breech Expansion
of
main
runway
to
9,200
feet
(with
parallel
taxiway) Airport
Culvert,
Drainage,
and
Erosion
Control
Project
which
includes:
drainage
ditch
excava3on
and
re‐grade,
 installing
drainage
structures,
plan3ng
low‐water,
low‐height
ground
cover
along
taxiway
&
taxi‐lane
shoulders
 and
runway/taxiway
islands
 Paving
&
Extension
(to
7,400
feet)
of
the
Cross‐Wind
Runway
with
parallel
taxiway
at
Alamogordo
‐
White
 Sands
Regional
Airport Solar
hea3ng
panels
for
Olympic
size
pool
at
Family
Recrea3on
Center,
open
and
heated
year
round














500,000


2

Fiber
Op3c
System
Expansion












1,000,000


10

Airport

FUDS
(Formerly
Used
Defense
Site)
Clearance












8,000,000


20

Airport

FUDS
(Formerly
Used
Defense
Site)
Clearance












8,000,000


20

NM

Airport

Storm
Drain
Improvements












2,000,000


20

Albuquerque

NM

Airport

Airport
Communica3ons
Center












6,000,000


50

Albuquerque

NM

Airport

South
General
Avia3on
Parking
Lot
Replacement












2,000,000


50

Albuquerque

NM

Airport

Sunport
Boulevard
Mill
and
Repave












2,000,000


50

Albuquerque

NM

Airport

Runway
4‐22
Reconstruc3on












7,000,000


75

Albuquerque

NM

Airport

South
General
Avia3on
Apron
Replacement












9,000,000


75

Albuquerque

NM

Airport

Airport
Terminal
Op3miza3on










13,000,000


150

Albuquerque

NM

CDBG

Dennis
Chavez
Community
Center
Improvements
(HVAC,
roof
&
doors)














250,000


9

Albuquerque

NM

CDBG

Rape
Crisis
ADA
Improvements














250,000


9

Albuquerque

NM

CDBG

SE
Heights
Area
‐
CD
Improvements
(Ligh3ng,
Sidewalks,
CPTED
&
Streetscapes)














250,000


9

Albuquerque

NM

CDBG

United
South
Broadway
Corpora3on
Youth
Training
Center














300,000


11

Albuquerque

NM

CDBG

Barelas
Community
Center
(Landscaping
&
historical
doors)














350,000


12

Albuquerque

NM

CDBG

Thomas
Bell
Community
Center
‐
Fitness
Center














350,000


12

Albuquerque

NM

CDBG

Affordable
Housing
Development
Improvements
(Streets,
Drainage,
Lights
&
U3lity
Expansion)














500,000


18

Albuquerque

NM

CDBG

NM
Aids
Services
Shelter
Reconstruc3on














500,000


18

Albuquerque

NM

CDBG

East
Central
Dental
&
WIC
Center
(Remodel,
Roof,
HVAC
&
Expansion)














535,000


19

Albuquerque

NM

CDBG

Balloon
Park
ADA

Restrooms
&
Sewer
Line














700,000


25

Albuquerque

NM

CDBG

Barelas
Community
Development
Improvements
(Trees,
Ligh3ng,
Sidewalks
)














900,000


32

Albuquerque

NM

CDBG

Albuquerque
Rescue
Mission
(Acquisi3on
&
Expansion)












3,000,000


35

Albuquerque

NM

CDBG

Trumbull
Rental
Facade
Improvements












1,000,000


35

Albuquerque

NM

CDBG












1,100,000


39

Albuquerque

NM

CDBG

Mesa
Verde
Community
Center
Improvements
(Phase
3
‐
add
Head
Start
classroom,
kitchen
&
site
 improvements) Non‐Profit
Facility
Acquisi3on/Renova3on












1,500,000


53

Albuquerque

NM

CDBG












1,500,000


53

Albuquerque

NM

CDBG

Westgate
Community
Center
Improvements
(Mul3‐purpose
addi3on
design,
roof,
HVAC,
intrusion
&
fire
alarm
 system) Alamosa
Community
Center
Property
Purchase
&
Expansion












2,000,000


70

Albuquerque

NM

CDBG

Capital
Improvements
to
Community
Dental
Services
Facili3es,
Hinkle
Southeast












2,000,000


70

Albuquerque

NM

CDBG

Cesar
Chavez
Community
Center
‐
New
Roof
and
educa3onal
center
addi3on












2,000,000


70

Albuquerque

NM

CDBG

Jerry
Kline
Recrea3on
Center,
Construct
community
indoor
athle3c
center












3,500,000


70

Albuquerque

NM

CDBG

Nob
Hill
Parking
Garage,
provide
merchant
parking
for
redeveloping
commerical
corridor












2,000,000


70

Albuquerque

NM

CDBG

Trumbull
Phase
2
(Streets,
Sewer
&
Water)












2,000,000


70

City

State

Program

Albuquerque

NM

CDBG

North
Domingo
Baca
Mul3‐Purpose
Community
Center

Project
Descrip3on

Funding
Required 










7,500,000


Jobs 200

Albuquerque

NM

CDBG

Albuquerque

NM

CDBG

North
Fourth
Street,
streetscape
to
improve
blighted
area












7,750,000


200

Los
Duranes
Mul3‐Purpose
Center,
reconstruc3on
of
condemmed
facility












6,000,000


Albuquerque

NM

210

CDBG

Westgate
Community
Center,
demolish
or
relocate
and
construct
mul3‐purpose
center












6,000,000


Albuquerque

210

NM

CDBG

Singing
Arrow
Community
Center,
Reconstruct
Community
Center












7,000,000


245

Albuquerque

NM

CDBG

Unser
Central
Regional
Library,
provide
library
for
under‐served
area
of
City












8,650,000


280

Albuquerque

NM

CDBG

Wilson
Junior
High
Pool,
renovate
and
enclose












8,000,000


280

Albuquerque

NM

CDBG

New
York
Metropolitan
Area
Streetscape,
improve
blighted
area










10,000,000


350

Albuquerque

NM

CDBG










20,000,000


700

Albuquerque

NM

CDBG

Albuquerque
Rail
Yards
Redevelopment,
environmental
remedia3on
Phase
I
and
development
of
affordable
 housing
component,
economic
development,
quality
of
life,
and
historic
preserva3on
for
Downtown
 Albuquerque Streetscape
Central
Avenue
from
Washington
street
to
Eubank
Blvd










20,000,000


700

Albuquerque

NM

CDBG








418,300,000
 14000

Albuquerque

NM

Energy

New
Mexico
Events
Center,
Hotel
and
Events
Center
and
realted
infrastructure
located
in
Downtown
 Albuquerque Municipal
Facility
Renewable
Energy
Retrofit
‐
Police
Sta3ons














525,000


1

Albuquerque

NM

Energy

Municipal
Facility
Renewable
Energy
Retrofit
‐
Fire
Sta3ons












1,575,000


3

Albuquerque

NM

Energy

Municipal
Facility
Renewable
Energy
Retrofit
‐
Support
facili3es












1,875,000


4

Albuquerque

NM

Energy

Municipal
Facility
Renewable
Energy
Retrofit
‐
Parking
Lot
Shade
&
Solar












2,500,000


5

Albuquerque

NM

Energy

Municipal
Facility
Renewable
Energy
Retrofit
‐
Parks












2,500,000


5

Albuquerque

NM

Energy

Municipal
Facility
Renewable
Energy
Retrofit
‐
Senior
&
Community
Centers












2,250,000


5

Albuquerque

NM

Energy

Sunport
Solar
Array
‐
3.675
MW
field
mounted










34,575,000


7

Albuquerque

NM

Energy

Solar
Charge
Sta3on
&
Plugin
Hybrid
/
Electric
Vehicle
Program












2,150,000


11

Albuquerque

NM

Energy

LA
Landfill
‐
Methane
to
Energy
project












6,650,000


15

Albuquerque

NM

Energy

Sunport
Solar
Array
on
Parking
Garage










10,500,000


20

Albuquerque

NM

Energy

Cerro
Colarado
‐
Methane
to
Energy
project










14,550,000


30

Albuquerque

NM

Energy

Small
Business
Energy
Audit
&
Retrofit
Program












5,000,000


50

Albuquerque

NM

Energy

Double
Eagle
Wind
Farm
‐
100
MW








140,000,000


60

Albuquerque

NM

Energy

Residen3al
Solar
Incen3ve
program










10,000,000


70

Albuquerque

NM

Energy

Small
Business
Solar
Incen3ve
program










10,000,000


70

Albuquerque

NM

Energy

Cerro
Colorado
Landfill
‐
40
MW
concentrated
solar
plant








213,000,000


80

Albuquerque

NM

Energy

Residen3al
Energy
Audit
&
Retrofit
Program












8,000,000


80

Albuquerque

NM

Energy










18,000,000


100

Albuquerque

NM

Energy

Purchase
residen3al
recycling
collec3on
vehicles
and
carts
to
implement
a
citywide
residen3al
single
stream
 cart‐based
recycling
collec3on
program Neighborhood
Energy
Genera3on
Pilot
Project








250,000,000


125

Albuquerque

NM

Energy

Double
Eagle
Concentrated
Solar
Plant
‐
100
MW








532,000,000


200

Albuquerque

NM

Energy

Municipal
Facili3es
Renewable
Energy
Retrofit
program
‐
200
Facili3es










72,000,000


216

Albuquerque

NM

Energy










13,000,000


355

Albuquerque

NM

Energy










21,000,000


735

Albuquerque

NM

Housing














405,600


6

Albuquerque

NM

Housing














236,600


6

Albuquerque

NM

Housing














507,000


6

Albuquerque

NM

Housing














811,200


6

Albuquerque

NM

Housing














304,200


6

Albuquerque

NM

Housing














845,000


6

Albuquerque

NM

Housing














590,300


8

Albuquerque

NM

Housing














980,200


9

Albuquerque

NM

Housing














785,500


10

Albuquerque

NM

Housing














524,000


10

Albuquerque

NM

Housing














304,200


10

Albuquerque

NM

Housing

Albuquerque

NM

Public
Safety

Construct
a
LEED
cer3fied
eco‐friendly
city
solid
waste
transfer
sta3on
to
accommodate
the
transfer
of
refuse
 and
recycling
from
residents
and
businesses. Construct
a
LEED
cer3fied
eco‐friendly
city
materials
recovery
facility
(MRF)
to
accommodate
the
increased
 flow
of
recycling
from
residents
and
businesses. 514
Morris
Development‐NM1‐15A,
24
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. 716
Morris
Development‐NM1‐15B,
14
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. Broadway
Development‐NM1‐12,
30
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. Copper
Development‐NM1‐23,
48
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. Grove
Development‐NM1‐13A,
18
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. Roma
Development‐NM1‐11,
50
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Flooring
coverings
and
Windows. Embudo
Towers
Development‐NM1‐10,
101
units.
Replace
all
Cabinets‐Countertops
and
Fixtures,
Floor
 coverings. Sunset
Gardens
Development‐NM1‐14A,
58
units.
Install
new
aqc
insula3on.
Replace
all
Interior
and
Exterior
 Doors,
Cabinets‐Countertops,
Floor
coverings
and
Windows. 60th
Street
Development‐NM1‐14B,
42
units.
Install
new
aqc
insula3on.
Replace
all
Interior
and
Exterior
 doors,
Cabinets‐Countertops
and
Fixtures,
all
Floor
coverings
and
Windows. Don
Gabal
Development‐NM1‐18,
31
units.
Replace
all
Interior
and
Exterior
doors,
Cabinets‐Countertops
and
 Fixtures
and
all
Floor
coverings.
Replace
all
Windows. Lafayefe
Development‐NM1‐15C,
18
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
and
 Fixtures,
Floor
coverings
and
Windows. Pennsylvania
Development‐NM1‐15E,
20
units.
Replace
all
Interior
and
Exterior
Doors,
Cabinets‐Countertops
 and
Fixtures,
Floor
coverings
and
Windows. Cyber
Crime
Unit
hardware,
sobware,
training
and
equipment

Albuquerque

NM

Public
Safety

Albuquerque

NM

Albuquerque














338,000


10












1,000,000


3

Bell
B3
Helicopter












3,750,000


4

Public
Safety

Forensic
Scien3sts














325,000


8

NM

Public
Safety

Cyber
Crimes
Unit
Staff














915,000


12

Albuquerque

NM

Streets/Roads

Menaul
Boulevard
Extension














500,000


10.5

Albuquerque

NM

Streets/Roads

Bike
Boulevards














500,000


14

Albuquerque

NM

Streets/Roads

Central
Bridge
Improvements
at
the
Alvarado
Transporta3on
Center














500,000


17.5

Albuquerque

NM

Streets/Roads

Mountain
Road
pedestrian
ligh3ng
and
streetscape
improvements












1,500,000


35

Albuquerque

NM

Streets/Roads

Nob
Hill
Parking
and
Pedestrian
Improvements












1,500,000


35

Albuquerque

NM

Streets/Roads

North
Diversion
Channel
Trail
Phase
II












1,000,000


35

City

State

Program

Albuquerque

NM

Streets/Roads

Ouray
and
Ladera
West
Improvements

Project
Descrip3on

Funding
Required 










1,000,000


Jobs 35

Albuquerque

NM

Streets/Roads

Albuquerque

NM

Streets/Roads

South
Broadway
Storm
Drain,
improvements
to
remove
neighborhood
from
flood
plain












1,500,000


35

Median
Enhancement
(interstates
and
arterials)












6,000,000


Albuquerque

NM

50

Streets/Roads

University
Boulevard
Phase
II












5,000,000


Albuquerque

50

NM

Streets/Roads

Academy
Bike
Lanes












1,500,000


52.5

Albuquerque

NM

Streets/Roads

Eubank
Blvd
and
Candelaria
median
landscaping












2,500,000


70

Albuquerque

NM

Streets/Roads

I‐40
Trail
and
Rio
Grande
Crossing












2,000,000


70

Albuquerque

NM

Streets/Roads

Reconstruct
intersec3on
of
Central
Avenue
and
Yucca
Street
to
improve
obsolete
intersec3on
cross
sec3on












2,000,000


70

Albuquerque

NM

Streets/Roads

Eubank
and
Central
Intersec3on
Improvements












2,500,000


87.5

Albuquerque

NM

Streets/Roads

Streetscape,
Southern
to
Eubank,
develop
commericial
corridor
at
major
employment
center












3,000,000


100

Albuquerque

NM

Streets/Roads

Atrisco
Drive
Improvements












3,100,000


108.5

Albuquerque

NM

Streets/Roads

Fortuna
Road
Imrovements












4,000,000


126

Albuquerque

NM

Streets/Roads

Bear
Canyon
I‐25
Pedestrian
Bridge












3,900,000


136.5

Albuquerque

NM

Streets/Roads

Street
Total
Reconstruc3on
10
streets












3,900,000


136.5

Albuquerque

NM

Streets/Roads

Morris
Street
bridge
over
I‐25.
Improved
access
to
major
employment
center












6,000,000


210

Albuquerque

NM

Streets/Roads

Paradise
Boulevard
Widening












6,000,000


210

Albuquerque

NM

Streets/Roads

Wyoming
Boulevard
Widening
Phase
I
(from
Academy
to
Alameda)












6,000,000


210

Albuquerque

NM

Streets/Roads

Unser
Boulevard
from
San
Ygnacio
to
Senator
Dennis
Chavez












6,500,000


227.5

Albuquerque

NM

Streets/Roads

Central
Avenue
Streetscape,
Moon
to
Tramway,
improve
raodway
through
redeveloping
commercial
corridor












7,000,000


245

Albuquerque

NM

Streets/Roads












7,000,000


245

Albuquerque

NM

Streets/Roads

Paseo
del
Vulcan
(east
alignment)
from
Paseo
del
Norte
to
Southern
Road
in
Rio
Rancho,
construct
two
lane
 arterial
to
provide
conges3on
relief
for
western
arterials
of
regional
raodway
system ADA
Enhancements
Citywide










10,000,000


350

Albuquerque

NM

Streets/Roads










10,900,000


350

Albuquerque

NM

Streets/Roads

New
Mexico
Events
Center
Road
and
U3lity
improvements,
downtown
Albuquerque.

Provide
necessary
 infrastructure
for
economic
development
purposes Coors
Blvd
traffic
flow
improvements
for
commuter
routes










18,000,000


630

Albuquerque

NM

Streets/Roads

District
3
storm
drain,
improvements
to
remove
neighborhood
from
the
flood
plain










18,850,000


630

Albuquerque

NM

Streets/Roads










40,000,000


1400

Albuquerque

NM

Streets/Roads

North
Domingo
Baca
Arroyo
Boulevard
construc3on
four
lane
arterial
to
provide
local
access
to
businesses
 adjoining
a
limited
expressway Paseo
del
Norte
I‐25
interchange,
reduce
conges3on
on
regional
raodway
system








300,000,000
 10000

Albuquerque

NM

Transit

Bus
benches
and
shelters
along
arterials
in
southeast
quadrant
of
city














200,000


5

Albuquerque

NM

Transit












3,000,000


40

Albuquerque

NM

Transit

Singing
Arrow
Park
and
Ride,
improve
mul3‐modal
service
from
East
Mountains
to
Albuquerque
employment
 centers Expansion
of
bus
rapid
ride
transit












5,000,000


50

Albuquerque

NM

Transit

Park
and
Ride
expansion












7,500,000


50

Albuquerque

NM

Transit

Replacement
of
out
of
date
fleet










35,000,000


75

Albuquerque

NM

Transit

Shelter
and
upgrade
of
transit
facility










25,000,000


200

Albuquerque

NM

Transit

New
Mexico
Train
Track
Plaza
canopy
and
plazorms
to
improve
a
commuter/AMTRAK
Sta3on










13,300,000


455

Albuquerque

NM

Transit

Street
Car
Phase
I
Central
Avenue










90,000,000


500

Albuquerque

NM

Water

Mountain
Road
Storm
Drain












1,200,000


35

Albuquerque

NM

Water

Mary
Ellen
Storm
Drain












1,700,000


59.5

Albuquerque

NM

Water












8,000,000


65

Albuquerque

NM

Water

Tingley
Beach
water
conserva3on
project
in
collabora3on
with
the
Army
Corp
of
Engineers
and
Bureau
of
 Reclama3on.
Goal:
water
conserva3on
and
sustainability. Arroyo
and
Channel
Rehabilita3on
(Citywide)












3,000,000


100

Albuquerque

NM

Water

San
Pedro
Storm
Drain
Improvement












3,200,000


112

Albuquerque

NM

Water

Moon
Street
Storm
Drain












3,700,000


129.5

Albuquerque

NM

Water

Post
Office
Broadway
Pump
Sta3on
and
related
Mar3neztown
Storm
Drainage
Improvements










45,000,000


150

Albuquerque

NM

Water

Coal
Street
Storm
Drain
Improvement












5,000,000


175

Bayard

NM

CDBG














300,000


5

Bayard

NM

CDBG














400,000


6

Bayard

NM

CDBG












1,000,000


10

Bayard

NM

CDBG

Community
Center
expansion
and
renova3on.

To
create
a
covered
and
fenced
outdoor
area,
expand
to
create
 a
equipment
storage
area
and
improvements/repairs
to
exis3ng
building. Community
Park.

Would
provide
for
addi3onal
construc3on
of
the
community
park
that
is
currently
in
 construc3on.

Current
project
is
for
sidewalks,
shade
structures
and
gazeboo. Public
library
renova3on
and
expansion.

Will
create
a
larger
library
to
create
a
learning
center
for
various
 groups
to
use. Reconstruc3on
of
local
streets
and
state
highway.












3,500,000


20

Bayard

NM

CDBG

Water
and
sewer
line
installa3on
and
replacement
improvements
to
22
areas
throughout
town.












3,500,000


30

Bayard

NM

Water

Water
storage
tank
demoli3on,
overhead
water
line
crossing
to
main
water
wells,
two
new
water
wells












1,000,000


10

Espanola

NM

CDBG

Incubator
building
for
economic
development












2,000,000


60

Espanola

NM

Public
Safety

Replacement
fire
engine

Espanola

NM

Streets/Roads

Espanola

NM

Espanola

NM

Espanola Espanola














300,000


0

Railroad
Avenue
extension
and
realignment
with
Espanola
Mainstreet












1,500,000


40

Streets/Roads

Replacement
of
Onate
Bridge
to
align
with
Main
Street












2,000,000


60

Streets/Roads

Industrial
Park
Road
reconstruc3on
and
drainage
improvements












3,500,000


105

NM

Streets/Roads

North
McCurdy
Road
surface
and
storm
drainage
enhancements












5,000,000


150

NM

Water

Improvements
to
KDCE
lib
sta3on














250,000


10

Espanola

NM

Water

New
water
storage
tank
to
serve
regional
water
partners
for
domes3c
use
and
fire
supression














500,000


15

Espanola

NM

Water

Replacement
of
water
storage
tank
for
domes3c
use
and
fire
supression














500,000


15

Espanola

NM

Water

Restora3on
of
Well
9
to
service
by
installing
horizontal
wells












1,000,000


30

Espanola

NM

Water

Water
treatment
system
‐
uranium
treatment












1,200,000


36

Espanola

NM

Water

North
Prince
Drive
extensions
of
water
and
wastewater
services












2,000,000


60

Espanola

NM

Water

Installa3on
of
sanitary
sewer
lines
to
residents
utlitzing
individual
sep3c
systems
within
city
limits












2,000,000


120

Espanola

NM

Water

Replacement
of
west
side
sanitary
sewer
lines
‐
original
installa3on
1950's












5,000,000


150

Las
Cruces

NM

CDBG

Main
Street
Plaza. Construct
Civic
Plaza
as
a
focal
point
of
Downtown
Revitaliza3on.












3,000,000


45

City

State

Program

Las
Cruces

NM

CDBG

Rio
Rancho

NM

Rio
Rancho Rio
Rancho

Project
Descrip3on

Funding
Required

Jobs












3,500,000


Streets/Roads

Main
Street
Revitaliza3on.
 Correct
outdated
traffic
pafers
from
one‐way
to
two‐way
streets.
Add
pedesrtrian
safety
features. Arsenic
Removal
at
Wells
#3
and
#15
‐
Complies
with
a
federal
unfunded
mandate
for
drinking
water
systems.

NM

Streets/Roads

Cherry
Road
Reconstruc3on
‐
Rebuilds
an
exis3ng
road
that
is
in
very
poor
condi3on.












3,500,000


NM

Streets/Roads












8,000,000


Rio
Rancho

NM

Streets/Roads

Northern
Blvd.
Widening
‐
Widens
Northern
Blvd.
from
35th
Ct.
to
just
west
of
Unser
Blvd.
This
project
can
be
 phased
if
necessary. Paseo
del
Volcan
‐
Builds
a
vital
new
arterial
from
US
550
to
Iris
Road.

Santa
Fe

NM

Airport

Fire
Figh3ng
Personnel
Safety
Equip.














100,000


Santa
Fe

NM

Airport

SF
Airport
East
Apron
Re‐Const.
Ph.2












1,000,000


8

Santa
Fe

NM

Airport

SF
Airport
East
Apron
Re‐Const.
Ph.1












1,500,000


10

Santa
Fe

NM

CDBG

Airport
Road
Re‐Development












2,000,000


Santa
Fe

NM

CDBG












8,000,000


250

Santa
Fe

NM

Housing

Development
of
a
regional
high‐speed
broad
band
loop
for
the
promo3ng
and
developing
economic
 development
and
workforce
development
projects
in
the
Santa
Fe
Region Development
of
addi3onal
Senior
Housing,
for
very
low
income
individuals












1,500,000


15

Santa
Fe

NM

Housing

Construc3on
of
addi3onal
units
for
affordable
housing












2,000,000


20

Santa
Fe

NM

Housing

Construc3on
of
the
Hopwell
Community
Center














650,000


36

Santa
Fe

NM

Streets/Roads

Dowtown
SF
River
Bridge














500,000


10

Santa
Fe

NM

Streets/Roads

Bishops
Lodge
Road
Urban
Project












1,000,000


15

Santa
Fe

NM

Streets/Roads

City
Street
Rehabilita3on












2,000,000


20

Santa
Fe

NM

Streets/Roads

Siler
Road
Extension












2,000,000


30

Santa
Fe

NM

Transit

Transit
Center
Bay
Expansion














300,000


5

Santa
Fe

NM

Transit

Sf
Place
Transit
Center














500,000


7

Santa
Fe

NM

Transit

Sf
Trails
Bus
Replacement
(10)












4,000,000


40

Santa
Fe

NM

Water

Construc3on
of
two
stream
gages
on
the
upper
and
lower
Santa
Fe
River.














200,000


2

Santa
Fe

NM

Water












2,000,000


4

Santa
Fe

NM

Water












3,000,000


10

Santa
Fe

NM

Water

Construc3on
of
3
water
delivery
systems
to
mi3gate
the
surface
water
impacts
of
ground
water
pumping
in
La
 Cienaga
and
the
Rio
Resuque Rehabilita3on
of
Drinking
Water
Distribu3on
System,
including
replacment
of
water
mains,
metered
water
 services
and
pressure
reducing
sta3ons. Upgrade
of
Water
Treatment
Effluent
Recycling
System

Santa
Fe

NM

Water

Construc3on
of
a
drinking
water
treatment
plant,
5
pump
sta3ons
and
26
miles
of
piping.

Silver
City

NM

CDBG

Silver
City

NM

CDBG

Silver
City

NM

CDBG

Silver
City

NM

Silver
City

NM

Silver
City

75












4,500,000











16,000,000
 1












4,000,000


35












8,000,000


225

Crea3on
of
Economic
Developer
posi3on
to
service
en3re
county.
















60,000


1

Replace
surface
of
parking
lot,
county
owned
hospital
Gila
Regional
Medical
Center














400,000


7

Purchase
historic
Silco
Theater,
Main
Street
economic
development












1,100,000


10

CDBG

Construc3on
of
new
Gospel
Mission
facility
for
homeless,
under
employed,
needy












2,000,000


18

CDBG

Addi3on
to
emergency
medical
services
(ambulance)
sta3on














300,000


20

NM

CDBG

Construc3on
of
Industrial
facili3es
at
County
industrial
park.












2,500,000


30

Silver
City

NM

CDBG

Mill
and
overlay
streets
Swan,
Silver,
12th.














950,000


30

Silver
City

NM

CDBG

Replacement
of
water
lines
and
fire
hydrants,
valves
in
Chihuahua
Hill
Neighborhood.
Restore
streets.














772,832


30

Silver
City

NM

CDBG

Construct
affordable
housing
subdivision












3,000,000


40

Silver
City

NM

CDBG

Construc3on
of
office
complex
County
owned
hospital,
Gila
Regional
Medical
Center












3,000,000


40

Silver
City

NM

CDBG

Health
Commons












5,000,000


40

Silver
City

NM

CDBG

Expansion
of
recrea3on
fields
at
Ben
D.
Altamirano
Sports
Complex












1,271,500


45

Silver
City

NM

CDBG

Construc3on
of
new
recrea3on
center












6,000,000


75

Silver
City

NM

CDBG

Improvements
to
Lifle
Walnut
Rd.












6,100,000


80

Silver
City

NM

CDBG

Construc3on
of
new
Town
Hall










12,000,000


120

Silver
City

NM

CDBG

Extension
and
enhancement
of
water
system
to
3e
in
surrounding
communi3es
for
regional
water
system












8,000,000


120

Silver
City

NM

Energy

Add
Solar
cells
and
equipment
to
water
pumps,
wastewater
systems.












7,000,000


15

Silver
City

NM

Public
Safety

public
area
law
enforcement,
networked
camera
system

Silver
City

NM

Public
Safety

Purchase
and
installa3on
of
mesh
network
for
law
enforcement
mobile
data
system

Silver
City

NM

Transit

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

CDBG

Henderson

NV

Energy

Henderson

NV

Energy

Henderson

NV

Energy

Henderson

NV

Energy














150,000


2












1,200,000


20

Purchase
of
buses
for
Regional
Transit
District
Servicing
Silver
City














300,000


5

CDBG
Streetlight
Pole
Replacement:
Infrastructure
improvements
that
can
include
improvements
to
storm
 drains,
street
lights,
curbs,
sidewalks,
and
gufers
as
required. Water
Street
Site
A
U3li3es
Reloca3on:
Water
and
sewer
main
reloca3on
for
Site
A
at
Water
Street
&
Victory.














109,600


8














800,000


15














400,000


20














425,000


20












1,000,000


25












3,000,000


40










10,000,000


150














800,327


20














550,000


30












2,254,000


30










20,000,000


30

Renova3ons
to
the
Valley
View
Recrea3on
Center‐Pa3o
shade
structure,
paint,
par33on
walls,
reloca3on
of
 front
desk,
room
addi3on
and
flooring
replacement. Renova3ons
to
the
Whitney
Ranch
Recrea3on
Center‐Pa3o
shade
structure,
paint,
par33on
walls,
reloca3on
of
 front
desk,
room
addi3on
and
outdoor
covered
play
structure. CDBG
Triangle
Area
Sidewalk
and
Handicap
Ramp
Improvements:
Infrastructure
improvements
that
can
 include
improvements
to
storm
drains,
street
lights,
curbs,
sidewalks,
and
gufers
as
required. Water
Street
Phase
3
and
North
Water
Street
–
Eastside
Connec3on
Project:
Roadway
improvements
from
 Victory
to
Lake
Mead
including
streetscape
and
storm
drain. Handicapped
and
Special
Needs
Sports
Complex,
located
in
the
Seven
Hills
Area,
to
benefit
the
special
needs
 popula3on

throughout
the
valley. Solar
Photovoltain
Power
Genera3on
Units
‐
1
at
Downtown
Recrea3on
Center
and
1
at
Mul3genera3onal
 Center Disinfec3on
By‐Product
Control‐Modify
the
exis3ng
filtra3on
facili3es,
install
granular
ac3vated
carbon
filter
 media,
and
analyze
the
reduc3on
of
disinfec3on
by
products
at
the
COH
water
treatment
plant. Downs
5
Morrell
Park
Phase
2:
Provide
connec3vity
between
the
downtown
Henderson
popula3on
to
the
 regional
trails
system
through
restora3on
of
the
exis3ng
Downs
5
Linear
Park
to
Boulder
Highway
along
Morrell
 Park,
connect
to
the
downtown
school
sites, Renewable
Energy
Project‐Implement
renewable
energy
applica3on
that
will
provide
up
to
3
‐
4
MW
of
power
 genera3on,
i.e.
crystalline
sun‐tracking
system
or
a
thin‐film
fixed
array
of
solar
panels.

City

State

Program

Henderson

NV

Energy

Henderson

NV

Energy

Henderson

NV

Energy

Henderson

NV

Housing

Hidden
Falls
Park:
Design
and
construc3on
of
a
18
acre
community
park
at
Horizon
Ridge
Parkway
and
Horizon
 Drive. Reunion
Park:
Design
and
construc3on
of
a
17
acre
neighborhood
park
located
in
the
Champion
Village
 subdivision
at
Stephanie
Street
adjacent
to
the
I‐215 Heritage
Park
Campus
Phase
1:
Develop
a
60
acre
mul3‐use
sports
field
complex
and
standard
park
ameni3es.
 Concept
plan
is
broken
into
four
(4)
phases
totaling
$51,701,288.26. Palo
Verde
–
roofs,
air
condi3oners

Project
Descrip3on

Henderson

NV

Housing

Henderson

NV

Henderson

NV

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Public
Safety

Henderson

NV

Streets/Roads

Henderson

NV

Streets/Roads

Henderson

NV

Streets/Roads

Henderson

NV

Streets/Roads

Henderson

NV

Streets/Roads

Henderson

NV

Streets/Roads

Henderson

NV

Transit

Henderson

NV

Water

Henderson

NV

Water

Henderson

NV

Water

Henderson

NV

Water

Henderson

NV

Water

Las
Vegas

NV

CDBG

Las
Vegas

NV

CDBG

Las
Vegas

NV

CDBG

Huntridge
Neighborhood
Street
Lights
and
Sidewalks
‐
Construct
street
lights
and
sidewalks
were
none
exist
 within
this
older
residen3al
subdivision. Doolifle
Park
Renova3ons
Phase
I

Las
Vegas

NV

CDBG

Las
Vegas
Boulevard
Neon
Signs
Project
–
Construct
neon
signage
within
Las
Vegas
Blvd
in
Downtown
Las
Vegas

Las
Vegas

NV

CDBG

Westside
School
Remodel‐
Renova3on

Las
Vegas

NV

CDBG

Las
Vegas

NV

Las
Vegas

Funding
Required

Jobs












7,365,000


40












9,327,450


40










20,000,000


150














240,000


5

Espinosa
–
air
condi3oner,
water
valves,
sidewalks














560,000


10

Housing

Landsman
Gardens
–
roofs,
water
valves,
paint,
siding,
stucco














490,000


10

Housing

Hampton
Courts
(3
buildings)
–
roofs,
siding,
stucco,
paint,
air
condi3oners,
main
water
valves,
parking
lot
 ligh3ng,
and
sidewalks. Radio
Tower
Repeater
Site
Project
‐
this
project
will
facilitate
communica3ons
with
a
sec3on
of
our
popula3on
 that
currently
has
limited
recep3on.
The
repeater
is
needed
to
protect
public
health
and
safety
in
cases
of
an
 imminent
threat
of
flood,
fire Deten3on
Center
Control
Room
Equipment
Enhancement
Project
–
replace
the
exis3ng
security
control
room
 equipment
in
the
Deten3on
Center
with
a
new
super
display
touch
screen
control
sta3on
in
the
Central
 Control,
and
three
Dual
LCD
touch
screen
contro Court
Security
‐
Purchase
and
install
e‐security
enhancement
sobware
for
more
efficient
court
administra3on.

 This
would
include
Municipal
Court
E‐Access,
CourtView
upgrades,
court
laptops,
video
security,
security
locks
 and
x‐ray
check
point
machine. Field
Technology
Project
‐
replacement
of
all
exis3ng
Laptops
and
vehicle
mounts
in
all
patrol
vehicles.

Exis3ng
 technology
is
over
5
years
old
and
does
not
provide
the
capabili3es
to
handle
new
and
updated
technology.
 Laptops
need
to
be
kept
current Radio
Communica3ons
Project
–
enhance
radio
communica3ons
with
latest
technology.

Exis3ng
technology
is
 outdated
and
not
Project
25
(digital)
compliant,
which
will
be
necessary
for
future
use. Enhanced
communica3on
allows
for
officers
to
communicate Communica3on
Center
Improvement
(Dispatch)
Project
–
New
redundant
servers,
radio
consoles
and
reader
 boards
to
enhance
the
exis3ng
capabili3es
of
our
Communica3on
Center
not
only
handles
police,
but
all
fire
 calls
as
well.

This
project
will
provide El
Dorado
Valley
Regional
Training
Center
‐
Infrastructure
for
a
regional
training
center
on
dedicated
BLM
land
 that
must
be
used
for
a
regional
purpose.

The
regional
training
center
will
provide
local
law
enforcement
 agencies
that
are
facing
constraints 2008/09
Street
R&R
Program:
Yearly
street
maintenance
contract
funded
by
gas
tax
revenues
that
consists
of
 removal
and
replacement
of
asphalt
on
exis3ng
residen3al
roadways
with
a
PCI
of
less
than
10.
The
08/09
 program
will
include
Annie
Oakley
and
all 2008/09
Arterial
roadway
resurfacing
and
removal
&
replacement
Program.

Arterials
qualified
for
3R
program
 must
have
PCI
of
20
or
less
and
may
include
but
are
not
limited
to:
American
Pacific,
US95
to
Arroyo
Grande;
 Eastgate,
Warm
Springs
to
Galleria;
Gr Galleria
Drive
‐
Boulder
Highway
to
Pabco
Road:
Purchase
right‐of‐way
along
Saddle
Associa3on
for
 construc3on
of
full
off‐sites
along
City
owned
parcels
and
RTC
sec3on
where
applicable
between
Ward
and
 Pabco
with
traffic
and
drainage
appurtenances
as
r Burkholder:
Lake
Mead
to
Racetrack:
Widen
to
4
travel
lanes
with
drainage
and
traffic
improvements.












3,070,000


20












1,200,000


5












1,200,000


8














320,000


9












2,480,000


10












2,500,000


10












1,467,000


20












2,000,000


30












3,500,000


12












4,000,000


30












4,500,000


30












6,000,000


50










30,000,000


50












6,000,000


50








100,000,000


200












1,507,000


25












1,734,700


25












3,449,600


30












4,086,884


30












2,585,000


40














800,000


4

Lake
Mead
Pkwy
Improvements
‐
Boulder
Hwy
to
Lake
Las
Vegas
Pkwy:
Widen
exis3ng
roadway
to
six
lanes,
 grade
separated
intersec3on
at
Lake
Las
Vegas
Parkway,
and
enhancements. Major
Avenue
‐
Van
Wagenen
to
Warm
Springs:
Reconstruc3on
with
drainage
and
traffic
improvements. Construct
separate
established
transit
lanes
to
provide
addi3onal
capacity
for
Bus
Rapid
Transit
along
Boulder
 Highway.

Partner
with
RTC
to
increase
transit
service
within
Clark
County. Misc
PRV
&
Pressure
Zone
Improvements
‐
Phase
I
–
Replaces
PRV’s
8
and
18
with
new
PRV’s
106
and
105,
 which
includes
installa3on
of
8‐inch
and
12‐inch
water
main
and
conversion
of
exis3ng
pressure
zones. Wigwam/US95
24‐inch
2120
Main
&
Prv.
‐
Installa3on
of
approximately
1,600
lineal
feet
of
20‐inch
main
from
 the
end
of
W‐225
(30‐inch
2120)
under
U.S.
95
to
Eastgate
Road
to
supply
the
2007
PRV;
and
installa3on
of
 approximately
2,700
lineal
feet
of
16‐in 3‐Inch
and
Larger
Water
Meter
&
Vault
Maintenance
Program
–
Repair/replacement
of
approximately
49
large
 meters
that
fail
or
are
mechanically
obsolete
and
do
not
func3on
within
AWWA
performance
standards
for
 large
meters.
 Landwell
2200
Sewer
Interceptor
–
Construc3on
of
approximately
3,300
lineal
feet
of
27‐inch
sewer
and
 replace
11,300
lineal
feet
of
21‐inch
with
new
27‐inch
line
north
of
Lake
Mead
Drive/Warm
Springs
Road
to
 Pabco
Road
and
south
of
Athens/Galleria. Pifman
Wash
Sanitary
Sewer
Reloca3on/Valle
Verde
to
Sandwedge
Channel
–
Reloca3on
of
approximately
 1,650
lineal
feet
of
exis3ng
21‐inch
sanitary
sewer
and
provide
a
maintenance
access
road
(approximately
 2,200
lineal
feet)
for
the
sewer
within
the
Pit Ethel
Pearson
Park
Improvements














800,000


4












2,000,000


10












2,000,000


10












2,500,000


12












4,000,000


20

CDBG

Hoover
Avenue
&
First
Street
Streetscape
Project
–
Construct
hardscape
and
landscaping
enhancements
within
 Downtown
Las
Vegas
according
to
Centennial
Standards. Stupak
Park
Reconstruc3on
–
Reconstruct
an
exis3ng
park
within
the
Downtown
Urban
core.












4,000,000


20

NV

CDBG

Rotary
Park
Rehabilita3on












4,700,000


24

Las
Vegas

NV

CDBG

Project
Clear
Skies
Downtown
Aerial
U3lity
Undergrounding










30,000,000


150

Las
Vegas

NV

CDBG

Las
Vegas
Historic
Post
Office
Museum
Rehabilita3on










55,000,000


275

Las
Vegas

NV

CDBG








167,000,000


835

Las
Vegas

NV

CDBG

Las
Vegas
City
Hall
and
Parking
Garage
–
Construct
a
new
City
Hall
and
Parking
Garage
within
Downtown
Las
 Vegas. Las
Vegas
Performing
Arts
Center
–
Construct
a
new
Performing
Arts
Center
within
the
City’s
Union
Park
 Development.








375,000,000


1875

City

State

Program

Las
Vegas

NV

Energy

Digester
gas
scrubbers
–
Water
Pollu3on
Control
Facility

Project
Descrip3on

Funding
Required 










2,000,000


Jobs

Las
Vegas

NV

Energy

Fuel
Cell
–
Water
Pollu3on
Control
Facility










18,500,000


5

Las
Vegas

NV

Energy

3
megawaf
solar
p.v.
at
Water
Pollu3on
Control
Facility










22,000,000


15

Las
Vegas

NV

Energy

Rebates
for
Green
Building
Program












1,000,000


25

Las
Vegas

NV

Energy










29,400,000


30

Las
Vegas

NV

Energy

4
megawaf
Solar
p.v.
on
public
buildings
(20
projects
across
the
city
that
are
all
scoped
and
ready
to
build
as
 funding
becomes
available) Public
Facility
Energy
Conserva3on
Program












5,000,000


30

Las
Vegas

NV

Energy

Rebates
for
Home
Performance
Energy/Sustainability
Audit
and
Retrofit
program












1,300,000


250

Las
Vegas

NV

Public
Safety

Fire
Sta3on
#42
Backup
Generator

Las
Vegas

NV

Public
Safety

Las
Vegas
Fire
Training
Burn
Tower
Rehabilita3on

Las
Vegas

NV

Streets/Roads

Las
Vegas

NV

Streets/Roads

Las
Vegas

NV

Las
Vegas

5














350,000


2












1,500,000


8














250,000


2

Streets/Roads

Charleston
Boulevard
Sidewalk
Replacement
‐
Replace
sidewalks
along
Charleston
Boulevard
to
meet
current
 ADA
requirements. Durango
Drive
Overlay
–
Cheyenne
Avenue
to
Alexander
Road














600,000


3

NV

Streets/Roads

Alexander
Road
Overlay
–
Cimarron
Road
to
US‐95














700,000


3.5

Las
Vegas

NV

Streets/Roads

Maryland
Parkway
and
13th
Street
Overlays
‐
Sahara
Avenue
to
Stewart
Avenue














920,000


4.5

Las
Vegas

NV

Streets/Roads












1,000,000


5

Las
Vegas

NV

Streets/Roads

Lamb
Boulevard
&
Pecos
Road
Bus
Turnouts
–
Construct
new
bus
turnouts
on
Lamb
Blvd
and
Pecos
Road
to
 relieve
traffic
conges3on. Lamb
Boulevard
Overlay
‐
Charleston
Boulevard
to
Owens
Avenue














980,000


5

Las
Vegas

NV

Streets/Roads












1,000,000


5

Las
Vegas

NV

Streets/Roads

Rancho
Park
Neighborhood
Roadway
Rehabilita3on
–
Reconstruct
pavement
in
the
Rancho
Park
Neighborhood
 that
has
reach
the
end
of
the
service
life. Rainbow
Boulevard
Overlay
‐
Smoke
Ranch
Road
to
Lone
Mountain
Road












2,000,000


10

Las
Vegas

NV

Streets/Roads

Bonanza
Road
Overlay
‐
Las
Vegas
Boulevard
to
Nellis
Boulevard












2,100,000


10.5

Las
Vegas

NV

Streets/Roads












3,000,000


15

Las
Vegas

NV

Streets/Roads












3,500,000


18

Las
Vegas

NV

Streets/Roads

Charleston
Boulevard
ITS
–
Construct
Intelligent
Transporta3on
System
interconnect
on
Charleston
Boulevard
 to
facilitate
traffic
flow
during
peak
travel
3mes. City
of
Las
Vegas
Traffic
Package
No.
7
–
Construct
new
traffic
signals
and
intersec3on
improvements
at
 Bonanza/Tonopah
and
Washington/Comstock. Cliff
Shadows
Parkway
Improvements
–
Cheyenne
Avenue
to
Lone
Mountain
Road












3,800,000


19

Las
Vegas

NV

Streets/Roads












4,000,000


20

Las
Vegas

NV

Streets/Roads












4,000,000


20

Las
Vegas

NV

Streets/Roads












3,980,000


20

Las
Vegas

NV

Streets/Roads

Las
Vegas

NV

Las
Vegas Las
Vegas

Clark
County
215
(CC215)
Beltway
Mul3‐Use
Trail
–
Construct
a
new
transporta3on
trail
system
within
the
 CC215
right‐of‐way
in
the
west
area
of
Las
Vegas. Las
Vegas
Wash
Trail
Phase
I
–
Construct
a
new
transporta3on
trail
within
the
Las
Vegas
Wash
right‐of‐way
that
 will
serve
as
a
regional
trail
throughout
Clark
County. Stewart
Avenue
Rehabilita3on
Phase
II
–
Las
Vegas
Blvd
to
Main
Street












4,800,000


24

Streets/Roads

Huntridge
Phase
6
Neighborhood
Roadway
Rehabilita3on
‐

Reconstruct
pavement
in
the
Huntridge
Phase
6
 Neighborhood
that
has
reach
the
end
of
the
service
life. Decatur
Blvd
Phase
I
–
US95
to
Faircenter
Parkway












7,300,000


36.5

NV

Streets/Roads

Vegas
Drive
Improvements
–
Michael
Way
to
Rancho
Drive










13,600,000


68

NV

Streets/Roads

Grand
Teton
Overpass
at
US95










16,200,000


81

Las
Vegas

NV

Streets/Roads










32,980,000


165

Las
Vegas

NV

Streets/Roads










60,000,000


300

Las
Vegas

NV

Transit

Horse
Interchange
–
Construct
a
new
service
interchange
at
Horse
Drive
and
US95
to
service
the
rapidly
 developing
Northwest
Las
Vegas Union
Park
Infrastructure
–
Roadways,
drainage,
u3lity
infrastructure
within
the
City
owned
redevelopment
 area. Five
miles
of
sidewalks
and
streetscape
ameni3es
downtown
adjacent
to
Bus
Rapid
Transit
lines












5,000,000


28

Las
Vegas

NV

Transit

ACE
buses
for
Bus
Rapid
Transit
lines










25,000,000


30

Las
Vegas

NV

Water










16,500,000


83

Las
Vegas

NV

Water










30,000,000


150

Las
Vegas

NV

Water










45,000,000


225

Mesquite

NV

Water

Rainbow
Boulevard
Storm
Drain
(Las
Vegas
Wash
–
Rainbow)
–
Regional
flood
control
facility
to
provide
 protec3on
for
Northwest
Las
Vegas. North
and
South
Environmental
Enhancement
Areas
in
Floyd
Lamb
Park
–
New
deten3on
basins
in
Floyd
Lamb
 park
to
protect
Northwest
Las
Vegas,
basin
are
beginning
designed
for
combined
recrea3onal
use
and
preserve
 environmental
resources. Elkhorn
Storm
Drain
(Las
Vegas
Wash
Middle
Branch
–
Decatur)
–
Regional
flood
control
facility
to
provide
 protec3on
for
Northwest
Las
Vegas. Wastewater
Treatment
Facility
Expansion










22,500,000


120

Reno

NV

CDBG

Reno

NV

CDBG

South
Virginia
Retail
Development
‐
invest
in
the
businesses
along
South
Virginia,
a
main
a
in
the
form
of
 facade
improvements
and
small
business
loans ADA
Upgrades
in
City
right‐of‐way
for
non‐compliant
wheelchair
ramps
and
sidewalk
sec3ons

Reno

NV

Energy

Parking
gallery
solar
project

Reno

NV

Energy

Downtown
Events
Center
Solar
project

Reno

NV

Housing

Reno

NV

Housing

Reno

NV

Housing

Reno

NV

Housing

Reno

NV

Streets/Roads

St.
Vincent's
Residence
‐
demoli3on
of
a
substandard
complex
to
be
replaced
with
a
28
single‐room
occupancy
 units
affordable
to
individuals
with
incomes
below
50%
of
the
area
median
income.
While
6
units
will
be
 suppor3ve,
transi3onal
housing
for
those Sierra
Manor
‐
an
acquis3on
and
rehabilita3on
project
intended
to
provide
a
higher
quality
living
environment
 for
very
low
income
seniors
while
con3nuing
to
provide
truly
affordable
housing Autumn
Village
‐
a
43
unit
affordable
housing
project
serving
families
at
or
below
50%
of
the
area
median
 income
including
9
units
for
households
currently
experiencing
homelessness Homeowner
rehabilita3on
‐
supplement
current
area
programs
to
assist
low
income
homeowners
make
 necessary
health
and
safety
repairs
and
energy
efficiency
upgrades
to
their
homes. Traffic
calming
measures
to
increase
pedestrian
and
bicycle
safety
in
areas
near
neighborhood
centers

Reno

NV

Streets/Roads

Reno

NV

Streets/Roads

Reno

NV

Reno












3,000,000


86










25,000,000


715














277,000


8












3,300,000


94














500,000


14












1,000,000


29












1,500,000


43












1,500,000


43














300,000


9

Rehabilita3on

&
preventa3ve
maintenance
of
surface
streets
throughout
city










18,500,000


528










19,375,000


551

Water

Install
new
and
upgrade
exis3ng
traffic
signals
to
energy
efficient
technology;
upgrade
video
detec3on
system
 for
traffic
signals;
replace
traffic
signal
controllers
with
smart
technology
to
lower
vehicle
idling
3me
and
 reduce
travel
3me,
thereby
redu Replacement
of
asphalt
pavement
within
plant
site














515,000


15

NV

Water

Rehabilita3on
of
Digester
#4
Cover














600,000


17

Reno

NV

Water

Removal
and
replacement
of
aging
electrical
transformers














850,000


24

Reno

NV

Water

Replace
aging
electrical
switchgear
‐
replace
main
electrical
switchgear














850,000


24

City

State

Program

Reno

NV

Water

Removal
and
replacement
of
exis3ng
maintenance‐intensive
sludge
cake
pumps
in
the
dewatering
building

Project
Descrip3on

Funding
Required 










1,120,600


Jobs 32

Reno

NV

Water

Reno

NV

Water

Overlay
of
Clean
Water
Way
from
TMWRF
to
McCarran
Ave












1,250,000


36

Phase
1
‐
extend
TMWRF
reuse
distribu3on
system












1,715,000


Reno

NV

49

Water

Storm
drain
&
other
flood
control
projects












3,000,000


Reno

86

NV

Water

Lakeside
trunk
sewer
replacement
‐
re‐align
&
replace
aging
sewer












3,100,000


89

Reno

NV

Water

2010
Unit
2
Sewer
Replacement
small
diameter
sewer
pipe
replacement












3,200,000


91

Reno

NV

Water

Lawton‐Verdi
Interceptor
phase
V
‐
river
crossing
and
interceptor
extension












4,025,000


115

Reno

NV

Water

North
Virginia
Phase
1B
Interceptor
replacement
and
upsize












4,200,000


120

Reno

NV

Water

2009
Sanitary
Sewer
CIPP
Lining
Project
‐
large
diameter
sewer
pipe
rehabilita3on












4,350,000


124

Reno

NV

Water

Flow
equaliza3on
basin
&
reuse
pumping
sta3on
upgrades












5,500,000


157

Sparks

NV

CDBG
















44,000


2

Sparks

NV

CDBG














232,000


8

Sparks

NV

CDBG














232,000


8

Sparks

NV

CDBG














411,295


14

Sparks

NV

CDBG

Regional
Trail
Rehabilita3on
Project
Phase
2:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
 regional
trails
that
will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Regional
Trail
Project
Phase
1:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that
 will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Regional
Trail
Rehabilita3on
Project
Phase
1:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
 regional
trails
that
will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Regional
Trail
Project
Phase
2:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that
 will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Glendale
Park
project














650,000


22

Sparks

NV

CDBG

Wedekind
Park
project














750,000


26

Sparks

NV

CDBG

Wild
Creek
park
project














770,000


27

Sparks

NV

CDBG

ADA
ramp
replacement
and
installa3on
project














860,000


30

Sparks

NV

CDBG














860,720


30

Sparks

NV

CDBG












1,019,640


35

Sparks

NV

CDBG












1,380,705


48

Sparks

NV

CDBG

Regional
Trail
Project
Phase
5:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that
 will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Regional
Trail
Project
Phase
4:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that
 will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Regional
Trail
Project
Phase
3:
Project
provides
required
rehabilita3on
to
exis3ng
asphalt
regional
trails
that
 will
enhance
the
use
of
non‐vehicular
travel
throughout
the
regional
park
system. Traffic
signal
intersec3on
ADA
&
pedestrian
crossing
project












1,570,000


54

Sparks

NV

CDBG












1,915,000


67

Sparks

NV

CDBG










12,000,000


343

Sparks

NV

Energy

Golden
Eagle
Park
Improvements:
Improvements
include
restroom
facili3es
and
concession
stands
in
our
new
 $30M
astro
turf
baseball,
sobball,
football,
volleyball
and
lifle
league
fields. Larry
D.
Johnson
Community
Center
Phase
II
&
III:
funding
to
complete
the
Community
Center
including
ESL
 language
classrooms
and
a
gym. Larry
D.
Johnson
Community
Center:
Installa3on
of
solar
panels

Sparks

NV

Energy

Traffic
signal
LED
project

Sparks

NV

Energy

Sparks

NV

Public
Safety

Sparks

NV

Sparks














500,000


9












3,695,000


13

Traffic
signal
interse3on
safety
ligh3ng
LED
project














440,000


15

Surveillance
equipment:
night
vision
goggles,
bait
tracker,
wire
box,
encrypted
radios,
and
pen
link
















45,000


4

Public
Safety

Police
Department
parking
lot
expansion














132,000


5

NV

Public
Safety

Technology
to
include
archive
writer
and
plate
scan
for
5
patrol
vehicles














200,000


6

Sparks

NV

Public
Safety

6
undercover
vehicles














180,000


8

Sparks

NV

Public
Safety

Armored
vehicle
(BEAR)
for
the
SWAT
team














420,000


8

Sparks

NV

Public
Safety

Shoo3ng
house
for
live
fire:
will
accomodate
all
of
the
department
and
SWAT
team.














600,000


8

Sparks

NV

Public
Safety

City
Facili3es
voice
and
data
communica3on
upgrade
project














250,000


9

Sparks

NV

Public
Safety

Awning
for
patrol
vehicles
in
secure
parking
lot














300,000


10

Sparks

NV

Public
Safety














440,000


10

Sparks

NV

Public
Safety

IT
upgrade:
replace
equipment
computer
server
room,
crime
view
phase
II
and
III,
report
wri3ng
upgrade,
 audio
and
video
in
training
rooms,
and
in‐house
security
system 6
patrol
vehicles














318,000


12

Sparks

NV

Public
Safety














356,000


12

Sparks

NV

Public
Safety

Emergency
ac3on
equipment
for
all
patrol
officers
to
include:
rifles
and
rifle
kits,
ballis3c
helmets
and
vests,
 breaching
kits,
and
breaching
shotguns Replace
all
department
handi‐talkies
(161)














470,000


12

Sparks

NV

Public
Safety

Re‐wire
all
6
dispatch
consoles
to
be
compa3ble
with
the
next
genera3on
of
technology














600,000


20

Sparks

NV

Public
Safety

Police
Department
outbuilding
Expansion














750,000


21

Sparks

NV

Public
Safety

Traffic
signal
bafery
back
up
project














693,000


24

Sparks

NV

Public
Safety

New
records
management
system
and
CAD:
allow
all
local
agencies
to
share
informa3on












2,000,000


30

Sparks

NV

Streets/Roads

El
Rancho
Dr,
Greenbrae
Way,
Sullivan
Lane,
and
sidewalk
accessibility/safety
improvements














108,356


4

Sparks

NV

Streets/Roads

Golden
Eagle
Traffic
Signal














290,000


10

Sparks

NV

Streets/Roads

Downtown
neighborhood
street
and
concrete
rehabilita3on












1,165,000


40

Sparks

NV

Streets/Roads

McCarran
Loop
neighborhood
street
and
concrete
rehabilita3on












1,165,000


40

Sparks

NV

Streets/Roads

Southwest
neighborhood
street
and
concrete
rehabilita3on












1,165,000


40

Sparks

NV

Streets/Roads

Prater
Way
phase
3
streetscape
project












1,295,000


43

Sparks

NV

Streets/Roads

Victorian
Square
Phase
2
public
improvements












2,156,106


75

Sparks

NV

Streets/Roads

York
Way
Street
&
Concrete
Rehablita3on












2,466,660


86

Sparks

NV

Streets/Roads

Industrial
Area
Street
&
Concrete
Rehabilita3on












3,708,870


130

Sparks

NV

Streets/Roads

Prater
Way
Street
&
Concrete
Rehabilita3on












3,860,320


135

Sparks

NV

Streets/Roads

Neighborhood
St
&
Concrete
Rehabilita3on












9,685,000


339

Sparks

NV

Streets/Roads

Vista
Blvd
Widening
Project










16,187,000


566

Sparks

NV

Water

Wingfield
Springs
sanitary
sewer
maintenance
and
effluent
upgrade
project














619,035


18

Sparks

NV

Water

Los
Altos
Parkway
effluent
upgrade
and
landscaping
project












2,097,000


60

Sparks

NV

Water

Orr
Ditch
lining
project












2,126,250


61

Sparks

NV

Water

Spanish
Spring
Interceptor
Phase
4












4,660,000


84

Sparks

NV

Water

Prater
Way
Storm
Drain
Rehabilita3on












7,679,205


138

Sparks

NV

Water

Spanish
Spring
Interceptor
Phase
3












9,435,000


170

City

State

Program

Sparks

NV

Water

Stanford
Way
Storm
Drain
Interceptor

Project
Descrip3on

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

CDBG

Albany

NY

Energy

St.
Joseph's
Academy
Ar3st's
Lob
Conversion
‐
conversion
of
an
exis3ng
vacant
school
into
ar3sts'
lob
housing
 and
community
space.

The
school
is
located
in
an
distressed
neighborhood
that
is
currently
undergoing
 reinvestment. C‐1
Neighborhood
Commercial
District
Facade
Program
‐
Program
would
con3nue
funding
for
successful
 ini3a3ve
that
provides
matching
funds
to
support
small
scale
locally
owned
neighborhood
businesses
 throughout
the
City's
commercial
corridors. Vacant
Building
Targeted
Stabiliza3on
Program
‐

This
program
will
target
one
third
of
the
vacant
and
 abandoned
proper3es
in
the
City
of
Albany
(300
buildings),
with
the
intent
of
acquiring
the
property
where
 necessary
or
designa3ng
a
receiver
to
addre Hoffman
Park
‐
Transforma3on
of
exis3ng
parkland
into
state
of
the
art
athle3c
facili3es
for
collegiate
and
 public
use,
including:
baseball,
sobball,
and
soccer
fields. Corning
Preserve
Phase
2
‐Amphitheater
and
Fes3val
Space
‐
The
comple3on
of
this
project
will
provide
a
 significantly
expanded
preserve
that
provides
extensive
community
and
recrea3onal
space
that
enhances
the
 environmental
quality
of
the
Hudson
River
 Downtown
Residen3al
Construc3on
&
Adap3ve
Re‐use
Program
‐
Program
funding
would
enable
construc3on
 of
new
or
rehabilita3on
of
older,
underu3lized
buildings
for
conversion
to
downtown
quality
housing.
 Downtown
has
800,000
square
feet
of
vacant
or
un Harriman
Campus
‐
21st
Century
Redevelopment
Sector‐
site
acquisi3on,
infrastructure
upgrade
and
site
 development. Strategic
Neighborhood
Redevelopment
Projects
‐
acquisi3on,
demoli3on,
rehabilita3on,
and
infill
 development
in
districts
that
are
presently
blighted
with
vacant
and
underu3lized
structures. Municipal
Fleet
Diesel
Retrofits
&
Upgrade

Albany

NY

Energy

Albany

NY

Energy

Albany

NY

Public
Safety

Albany

NY

Public
Safety

Albany

NY

Public
Safety

Albany

NY

Streets/Roads

Albany

NY

Transit

Albany

NY

Water

Port
of
Albany
wharf
replacement
and
stabiliza3on
and
rail
expansion
project
‐
Funding
to
completely
renovate
 the
dock
and
wharf
at
the
Albany
Port
District
Commission
would
enable
the
facility
to
con3nue
to
be
a
 mari3me
hub
for
the
Northeastern
por3o Regulator
Rehabilita3on
Project

Albany

NY

Water

West
Lawrence
Stormwater
Storage

Albany

NY

Water

Academy
Area
Storm
Sewer
Extension

Albany

NY

Water

Albany

NY

Albany

Municipal
Buidings
Alterna3ve
Energy
Retrofits
‐
Program
will
install
alterna3ve
energy
retorifits
to
exis3ng
 municipal
buildings Vacant
Building
Green
Rehab
Grant
Program
‐
Program
will
provide
grants
to
owners
who
purchase
vacant
 buildings
in
targeted
areas
and
rehab
them
to
green
building
standards.
Buildings
mus
be
owner‐occupied
for
a
 set
period
of
3me. Public
Safety
Interoperable
Data
Communica3ons
‐
APD
received
a
$3.5m
COPS
Technology
grant
to
provide
 law
enforcement
agencies
in
Albany,
Rensselaer,
and
Schenectady
coun3es
with
integrated
Records
 Management
Systems.

The
project
is
under
way,
and
add Violent
Crime
Suppression
Ini3a3ve
‐
APD
received
a
$330,000.00
Byrne
grant,
which
provided
wireless
access
 points
and
in‐car
cameras
for
use
in
areas
targeted
for
high
incidence
of
firearm
related
crime.

The
grant
also
 funded
special
details
of
office Wireless
access
to
underserved
popula3ons
ini3a3ve‐
the
city
has
partnered
with
a
local
wireless
internet
 provider
to
install
access
points
into
areas
of
the
city
in
which
the
populous
has
a
diminished
ability
to
gain
 access
to
internet
services
for
em State
Street
Rehabilita3on

Funding
Required Jobs 








10,025,000
 180












2,000,000


22












3,000,000


25












4,000,000


25












5,000,000


35












4,500,000


40












5,000,000


50










19,000,000


75










20,000,000


100














750,000


10












2,000,000


20












1,500,000


20














250,000


0














300,000


0












1,000,000


0












2,500,000


29












8,800,000


15
















30,000


3














115,000


8














150,000


9

Allen
Street
Sewer
Slip
Lining
Project
















90,000


9

Water

Hansen
Avenue
Storm
Sewer
Project














200,000


9

NY

Water

Kent
Street
Sewer
Project














160,000


9

Albany

NY

Water

Prospect
Street
Storm
Sewer
Project
















60,000


9

Albany

NY

Water

Rose
Court/Dartmouth
Deten3on
Basins














125,000


9

Albany

NY

Water

Ryckman
Avenue
Storm
Sewer
Project














130,000


9

Albany

NY

Water

Tampa
Avenue
Storm
Sewer
Project














120,000


9

Albany

NY

Water

Woodville
Sewer
Project
















27,000


9

Albany

NY

Water

Loudonville
Reservoir
LT2ESWTR














950,000


14

Albany

NY

Water

Delaware
Avenue
Sewer
Replacement
and
Relining












1,075,000


18

Albany

NY

Water

Melrose
Area
Stormwater
Recharge
Basins














730,000


27

Binghamton

NY

CDBG

City
Hall
‐
Plumbing
improvements
including
ADA
compliance
projects.














110,000


4

Binghamton

NY

CDBG

City
Hall
HVAC
improvements,
including
a
new
energy
effficient
cooling
tower,
pumps,
and
controls.














120,000


5

Binghamton

NY

CDBG

First
Ward
Senior
Center
‐
Renova3on
‐
including
new
energy
efficient
HVAC
System.














170,000


5

Binghamton

NY

CDBG














195,000


6

Binghamton

NY

CDBG

Lloyd
Greenman
Senior
Center‐ Renova3on
including
new
energy
efficient
HVAC
System. Sidewalk
and
Curb
replacement
in
blighted
neighborhoods.














225,000


6

Binghamton

NY

CDBG














650,000


8

Binghamton

NY

CDBG














185,000


11

Binghamton

NY

CDBG














170,000


12

Binghamton

NY

Streets/Roads














360,000


8

Binghamton

NY

Streets/Roads

City
Hall
Elevators
renova3on.
The
Elevators
are
37
years
old
and
have
not
been
upgraded
to
be
ADA
compliant
 or
energy
efficient. Columbus
Park
renova3on‐
Upgrades
to
Bathhouse
to
make
ADA
compliant
and
building
improvements
 including
plumbing
and
electrical
upgrades‐new
fence
and
bleachers
for
Lifle
League
Field.
Fountain
re‐hab. Sherri‐Lindsey
Park
Pool
House
renova3on
‐
to
install
a
HotWater
System
for
Showers
‐
bring
building
into
ADA
 compliance‐
put
a
roof
on
the
building High
Mast
Street
Ligh3ng
‐
to
improve
safety
through
increased
road
visibillity
and
poles
being
placed
further
 from
the
driving
lanes
where
poles
are
oben
hit.
Maintenance
is
also
performed
safer
and
less
frequently.
 Improvement
of
energy
efficiency
is
 Mill
Street
(Vestal
to
Conklin)
4"
mill
and
pave.

Binghamton

NY

Streets/Roads

Binghamton

NY

Binghamton

NY
















63,044


8

Eldredge
Street
(Water
to
Chenango)
4"
mill
and
pave.














111,552


10

Streets/Roads

South
Washington
Street
(Corbef
to
Morgan)
4"
mill
and
pave.














107,819


10

Streets/Roads

Frederick
Street
(Chenango
to
Brandywine)
4"
mill
and
pave
plus
curb
and
sidewalk
replacement
as
needed.














250,310


12

City

State

Program

Binghamton

NY

Streets/Roads

Oak
Street
(Main
to
Leroy)
4"
mill
and
pave
plus
addi3onal
catchbasins.

Project
Descrip3on

Funding
Required 












162,364


Jobs 12

Binghamton

NY

Streets/Roads

Binghamton

NY

Streets/Roads

Mary
Street
(
Morgan
to
James)
4"
mill
and
pave,
new
catch
basins,
new
curb
and
sidewalk
as
needed.














320,000


14

Prospect
Street
(Front
to
City
Line)
4"
mill
and
pave.














415,341


Binghamton

NY

14

Streets/Roads

State
Street
(Hawley
to
Lewis)
4"
mill
and
pave,
curb
and
sidewalk
replacement
as
needed.














359,691


Binghamton

14

NY

Streets/Roads














453,884


16

Binghamton

NY

Streets/Roads

Henry
Street
(Brandywine
to
Water) 4"
mill
and
pave
plus
new
curb
and
sidewalk
as
needed
and
trees
where
appropriate. Park
Ave
(vestal
to
Morgan)
4"
mill
and
pave
plus
sidewalk
and
curb
replacement
as
needed.














662,688


16

Binghamton

NY

Streets/Roads














525,000


16

Binghamton

NY

Streets/Roads












1,155,921


20

Binghamton

NY

Streets/Roads














533,650


22

Binghamton

NY

Streets/Roads

Binghamton

NY

Streets/Roads

Binghamton

NY

Water

Binghamton

NY

Water

Binghamton

NY

Water

Binghamton

NY

Water

Binghamton

NY

Water

Binghamton

NY

Water

Binghamton

NY

Water

Large
Water
Meter
replacement

and
pit
upgrades
with
the
addi3on
of
Telemetry
‐
The
opera3ons
become
 greener.
New
Back‐flow
preventors
‐
will
improve
the
Water
quality. Park
Channel
Floor
replacement‐
The
concrete
channel
was
built
by
the
ACOE
as
a
flood
control
project
which
 acts
as
a
conduit
to
guide
storm
water
through
a
densely
populated
area
to
the
river.
During
the
annual
 inspec3on
this
year
the
ACOE
has
determine Rush/Zane
Road
Storm
Sewer
‐
Provide
new
storm
sewer
system
to
control
localized
flooding
caused
by
 stormwater. West
Side
Separa3on
Project
(Laurel,
Lathrop,
Mallard)
‐
Separa3ng
combined
sewers
into
sanitary
and
storm
 sewer
systems. Rock
Bofom
Flood
Wall
‐
Provide
improvements
and
rehabilita3on
of
an
exis3ng
structure,
integral
to
the
 flood
water
control
system.
Provide
addi3onal
capacity
for
local
stormwater
management
system. Laurel
Ave
Stormwater
Pump
Sta3on
extension
‐
this
project
will
extend
an
ongoing
Combined
Sewer
 sepera3on
project
for
several
blocks. Park
Avenue
Sanitary
Sewer
‐
Sewer
separa3on
of
exis3ng
combined
sewer
system.

Binghamton

NY

Water

Binghamton

NY

Binghamton

South
Washington
Street
Bridge
Pain3ng
‐
Rehabilitate
and
Restore
a
Historic
Steel
Truss
Bridge.
This
is
a
highly
 used
Pedestrian
Bridge. Main
Street
rehab‐
4"
mill
and
pave with
sidewalk
and
curb
replacement
as
needed. Glenwood
Avenue
(Main
to
Prospect)
‐
4"
Mill
and
Pave,
with
new
curb
and
sidewalk. Hawley
Street
(State
to
Court)
4"
Mill
and
Pave,
with
new
curb
and
sidewalks.
Will
improve
a
highly
visible
 block
in
the
Downtown
Shopping
District. Robinson
Street
(Chenango
to
Fairview)
‐
4"
Mill
and
Pave
with
new
curb
and
sidewalk
improvements.














224,923


23












1,273,668


24














360,000


8














520,000


14














130,000


14














688,750


16














225,000


20












1,250,000


22














475,000


22

Annual
Water
Main
replacement
and
upgrade.












1,500,000


24

Water

Annual
Sewer
replacement
and
upgrade.












2,000,000


26

NY

Water














321,500


26

Binghamton

NY

Water












3,932,500


32

Brighton

NY

Streets/Roads

McDonald
Avenue
Pump
Sta3on
‐
Pump
sta3on
improvements
to
increase
capacity
and
improve
performance,
 which
will
support
local
urban
redevelopment
in
a
mixed
use
neighborhood. Small
Water
Meter
replacement

"City
wide"
14,300
meters
will
be
replaced
by
new
electronic
radioread
 meters.
Water
conserva3on
will
be
greatly
improved.
 Senator
Kea3ng
Boulevard












3,600,000


40

Buffalo

NY

CDBG

Johnny
B.
Wiley
Sports
Complex
roof
&
structural
repairs

















53,500


5

Buffalo

NY

CDBG

Riverbend
development
plan














100,000


5

Buffalo

NY

CDBG

Center
for
Transporta3on
Excellence














250,000


10

Buffalo

NY

CDBG

Moselle
Clinic
repairs
and
improvements















214,000


10

Buffalo

NY

CDBG

Sycamore
Village
clean
up,
southeast
corner















200,000


10

Buffalo

NY

CDBG

664
Washington
Street
roof
repair















250,000


12

Buffalo

NY

CDBG














321,000


15

Buffalo

NY

CDBG

Cri3cal
infrastructure/
key
resource
protec3on
recommended
by
Buffalo
UASI,
NIPP,
and
Dept.
of
Homeland
 Security District
heat
distribu3on
system
replacement














214,000


15

Buffalo

NY

CDBG

Buffalo
&
Erie
County
Historical
Society
electrical
system
upgrade














642,000


20

Buffalo

NY

CDBG














767,000


20

Buffalo

NY

CDBG

City
wide
Buffalo
Public
library
repairs
including:

Crane
Branch,
Dudley
Branch,
East
Clinton
Branch,
East
 Delavan
Branch African
Cultural
Center
bldg.
construc3on












1,000,000


30

Buffalo

NY

CDBG














875,000


30

Buffalo

NY

CDBG

Fire
Headquarters:
Replacement
of
defec3ve
non
efficient
windows,
replacement
of
window
air
condi3oners
 with
central
units


 Beverly
A.
Gray
Incubator
project












2,000,000


60

Buffalo

NY

CDBG












1,941,000


58

Buffalo

NY

CDBG

Police
Garage:
Replacement
of
40
year
old
boiler
hea3ng
system,
installa3on
of
new
electrical
system,
present
 system
is
40
years
old.

Replace
all
exis3ng
light
fixtures
over
20
years
old.

New
double
pane
windows
in
 mechanic
area
and
other
loca3ons
n Broadway
Market
roof
reconstruc3on
and
general
building
improvements












2,000,000


60

Buffalo

NY

CDBG

Hickory
Woods
environmental
clean
up














2,500,000


75

Buffalo

NY

CDBG












2,117,927


100

Buffalo

NY

CDBG

Community
Centers:
Approximately
10
centers
need

double
insulated
windows
units,
energy
efficient
hea3ng
 systems,

replacement
of
defec3ve
bathroom
fixtures
with
water
savers,
structural
repairs
and
electrical
 upgrades

 Village
farms
environmental
clean
up












5,000,000


150

Buffalo

NY

CDBG












3,300,000


115

Buffalo

NY

CDBG

Various
firehouses:
Replacement
of
non
energy
efficient
windows,
insulated
garage
doors,
new
hea3ng
 systems
for
units
over
20
year
of
age.

There
are
over
25
firehouses
that
this
would
address
 Erie
Basin
Marina
improvements:
docks
and
infrastructure













3,000,000


90

Buffalo

NY

CDBG

Scajaquada
Creek
dredging
and
Delaware
park
improvements












6,600,000


200

Buffalo

NY

CDBG












6,825,000


205

Buffalo

NY

CDBG

Public
Works
Buildings:
Updated
energy
efficient
electrical
and
ligh3ng,
windows,
to
replace
single
pane
glass
 with
double
insulated
newer
standard
upgrades.

Boilers
that
are
non
efficient
would
be
important
energy
 savers.

Bathrooms
fixture
replacement Darwin‐Mar3n
house
project












7,000,000


210

Buffalo

NY

CDBG

Buffalo
Lakeside
Commerce
park
environmental
clean
up












7,000,000


210

Buffalo

NY

CDBG

Buffalo
historic
building
repair
and
redevelopment













7,100,000


212

Buffalo

NY

CDBG

90
Hopkins
environmental
clean
up












7,500,000


225

Buffalo

NY

CDBG

City
Hall:
Replacement
of
defec3ve
central
air
condi3oning
units,
Northern
side
windows
replacement
with
 double
insulated
units,
new
energy
efficient
accent
ligh3ng
to
exterior
of
building,

replacement
of
defec3ve
 bathroom
fixtures
with
water
savers,












7,500,000


225

City

State

Program

Buffalo

NY

CDBG

1260
South
Park
environmental
clean
up

Project
Descrip3on

Buffalo

NY

CDBG

59
Memorial
environmental
clean
up










15,000,000


400

Buffalo

NY

CDBG

BNMC
Mul3‐Modal
Transporta3on
Structure










25,000,000


700

Buffalo

NY

CDBG










49,203,050


1900

Buffalo

NY

Energy

Buffalo
Park
System:
Rehab
and
repair
of
park
infrastructure:

Mar3n
Luther
King
Jr.
Park,

LaSalle
Park,

 Riverside
Park,

Shoshone
Park,

Roosevelt
Park,

Cazenovia
park,

Delaware
Park,

Schiller
Park,

Emerson
Park,

 Sole
Park
and
Willert
Park Solar
Panel
Energy
Savings
job
training
&
placement
center














285,000


10

Buffalo

NY

Energy

Perc
to
wet
clean
technology
&
training
center














300,000


15

Buffalo

NY

Energy












1,500,000


50

Buffalo

NY

Energy

City
wide
Green
Infrastructure:
Greening
on
vacant
lots
and
ground
water
reten3on,
storm
water
collec3on,
 treatment
and
infiltra3on

 Buffalo
geothermal












11,000,000


330

Buffalo

NY

Energy










16,000,000


500

Buffalo

NY

Housing

Buffalo
Green
R&D
incubator
for
renewable
energy
and
site
infrastructure
upgrades:
rail,
roads
and
Buffalo
 River
improvements
 Housing
repair
and
emergency
demoli3on










45,000,000


1800

Buffalo

NY

Public
Safety

Buffalo
Fire
Dept.:
Fire
apparatus













1,952,155


Buffalo

NY

Public
Safety

Buffalo
Police
&
Fire
radio
system













2,140,000


Buffalo

NY

Public
Safety

Camera
surveillance
monitoring
room
expansion














300,000


Buffalo

NY

Public
Safety

Buffalo
Police:
Gunshot
detec3on
locator
enhancement














500,000


Buffalo

NY

Public
Safety

Buffalo
Fire
Dept.:

Mobile
data
system














798,610


Buffalo

NY

Streets/Roads

Middlesex
Ave.
reconstruc3on














230,496


10

Buffalo

NY

Streets/Roads

Hickory
Woods
infrastructure
improvements














625,000


19

Buffalo

NY

Streets/Roads

Broadway
corridor
improvements















750,000


21

Buffalo

NY

Streets/Roads

Citywide
emergency
bridge
repairs














750,000


21

Buffalo

NY

Streets/Roads

Intersec3on
realignment,
Franklin/
Linwood/
North
Pearl














750,000


21

Buffalo

NY

Streets/Roads

North
Buffalo;
Grant
St./Amherst
St./Hertel
Ave.
improvements














820,000


27

Buffalo

NY

Streets/Roads

Erie
Canal
horbor
streets
‐
Phase
III














933,000


28

Buffalo

NY

Streets/Roads

Porter
Ave.
streetscape
–
Phase
I















850,000


28

Buffalo

NY

Streets/Roads

Hopkins
Street
bridge
replacement













1,000,000


30

Buffalo

NY

Streets/Roads

Buffalo
River
greenway,
mul3‐purpose
trail












1,500,000


45

Buffalo

NY

Streets/Roads

Larkin
District
streetscape
and
mill












1,500,000


45

Buffalo

NY

Streets/Roads

City
wide
sidewalk
replacement













2,000,000


60

Buffalo

NY

Streets/Roads

Tifft
Street
bridge
and
streetscape
improvements













2,000,000


60

Buffalo

NY

Streets/Roads

Exchange
Street
improvements












1,494,000


45

Buffalo

NY

Streets/Roads

Fargo
St.
repair
and
streetscape












2,001,000


60

Buffalo

NY

Streets/Roads

Humboldt
park
streetscape













2,000,000


60

Buffalo

NY

Streets/Roads

Michigan
Ave.
corridor
improvements












2,001,000


60

Buffalo

NY

Streets/Roads

Niagara
St.
gateway
project












2,000,000


60

Buffalo

NY

Streets/Roads

Pearl
Street
conversion
to
two
way
traffic













2,000,000


60

Buffalo

NY

Streets/Roads

Main
Street
700
block
improvements












2,167,000


64

Buffalo

NY

Streets/Roads

South
Park
improvements,
streetscape
&
paving
Bailey
Ave.
to
city
line













3,000,000


90

Buffalo

NY

Streets/Roads

BNMC,
Phase
‐
I

Ellicof
St.
Streetscape
improvement












2,400,000


72

Buffalo

NY

Streets/Roads

Porter
Ave.
streetscape
–
Phase
II












2,400,000


72

Buffalo

NY

Streets/Roads

Seneca/Hopkins/
McKinley/S.
Park
Ave.
improvements












4,000,000


120

Buffalo

NY

Streets/Roads

Erie
Canal
Harbor
streets
‐
Phase
II












3,598,000


105

Buffalo

NY

Streets/Roads

BNMC
Phase
II
streetscape
improvements












4,010,000


120

Buffalo

NY

Streets/Roads

Fillmore
Ave.
resurfacing
and
streetscape












4,000,000


120

Buffalo

NY

Streets/Roads

W
Ferry
St/Black
Rock
Canal
(bridge
rehab)












3,999,000


120

Buffalo

NY

Streets/Roads

Buffalo
Lakeside
Commerce
Park
‐
Phase
4
Rd.












5,000,000


150

Buffalo

NY

Streets/Roads

Various
signal
replacement;
Ferry
St.
&
Delavan
Ave.












5,000,000


150

Buffalo

NY

Streets/Roads

City‐wide
street
improvements:
mill,
overlay,
and
sidewalks












6,000,000


180

Buffalo

NY

Streets/Roads

Babcock
St./Norfolk
Southern
Bridge
replacement












8,000,000


212

Buffalo

NY

Streets/Roads

BNMC
phase
3;
Allen
Street
extension












7,504,000


225

Buffalo

NY

Streets/Roads

Kenmore
Ave.;
Starin
Ave
‐
Rt
5
(Main
Street)
improvements










10,000,000


300

Buffalo

NY

Streets/Roads

Cars
on
Main
Street,
600
block











10,000,000


300

Buffalo

NY

Streets/Roads

Bailey
Avenue
Bridge
Replacement











16,000,000


500

Buffalo

NY

Streets/Roads

Rt
5;
Rt
198
to
Hertel
Ave.
‐
(Main
St.)
improvements










22,619,000


675

Buffalo

NY

Streets/Roads

Tifft
Street
connector










35,000,000


1050

Buffalo

NY

Streets/Roads

Cars
on
Main
Street
–
100
to
500
blocks









100,000,000


4000

Buffalo

NY

Streets/Roads

Southdown's
Connector‐Phase
I










52,000,000


1560

Buffalo

NY

Transit

City
street
vehicles
replacement
–
energy
efficient
vehicles












1,000,000


Buffalo

NY

Water

Sewer
storm
water
separa3on
system












1,500,000


45

Buffalo

NY

Water












2,000,000


60

Buffalo

NY

Water

Various
Loca3ons
3
–
rehabilita3on
or
replacement
of
exis3ng
“low
flow”
water
mains
at
various
loca3ons
 throughout
City
to
provide
minimum
field
measured
hydrant
flow
of
500
gallons
per
minute GIS
Data
Management
–
Conversion
of
all
our
paper
records
into
GIS
for
opera3on
efficiency












1,000,000


30

Buffalo

NY

Water












2,000,000


60

Buffalo

NY

Water












2,500,000


75

Buffalo

NY

Water












3,500,000


105

Buffalo

NY

Water










15,000,000


400

Disinfec3on
System
Rehabilita3on
–
rehabilita3on
and
process
enhancement
of
exis3ng
disinfec3on
 equipment Dechlorina3on
/
Sewer
for
Thickener
Decant–
installa3on
of
a
new
underground
conduit
and
dechlorina3on
 facili3es
to
allow
decant
from
the
thickener
process
to
be
discharge
and
not
re‐cycled
in
the
treatment
process New
Low
Service
Pumps
–
rehabilita3on
of
exis3ng
low
service
pumps
including
a
new
pump
for
opera3onal
 performance
and
energy
savings Construc3on
of
a
floatables
control
facility


Funding
Required Jobs 








15,000,000
 400

City

State

Program

Buffalo

NY

Water

Modifica3ons
to
sewer
authority
incinerator

Project
Descrip3on

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Seneca
Street:
Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
southeast
quadrant
of
City
with
 increase
in
pipe
size
to
improve
water
supply
 Clinton
Street,
Lower
Terrace
to
Jefferson
Avenue
–
rehabilita3on
of
36‐inch
diameter
principal
water
 transmission
main
in
City’s
downtown
business
district
to
maintain
water
supply
for
domes3c
use
and
fire
 protec3on Filter
Plant
Solids
Handling
Facility
–
installa3on
of
equipment
and
appurtenances
to
allow
solids
thickening
on
 site
to
improve
opera3on Michigan
Avenue,
Virginia
Street
to
Best
Street
–
rehabilita3on
of
36‐inch
diameter
principal
water
 transmission
main
in
City’s
hospital
corridor
to
maintain
water
supply
for
domes3c
use
and
fire
protec3on Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
northern
half
of
City
to
maintain
adequate
water
 supply
for
domes3c
use
and
fire
protec3on Replacement
of
exis3ng
water
mains
at
various
loca3ons
in
southern
half
of
City
to
maintain
adequate
water
 supply
for
domes3c
use
and
fire
protec3on Storage
and
Pump
Sta3ons
–
Rehabilita3on
of
exis3ng
storage
tanks
and
pump
sta3ons

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Buffalo

NY

Water

Various
Loca3ons
4
–
replacement
of
exis3ng
water
mains
at
addi3onal
various
loca3ons
in
northern
half
of
 City
to
maintain
adequate
water
supply
for
domes3c
use
and
fire
protec3on Various
Loca3ons
5
–
replacement
of
exis3ng
water
mains
at
addi3onal
various
loca3ons
in
southern
half
of
 City
to
maintain
adequate
water
supply
for
domes3c
use
and
fire
protec3on New
High
Service
Pumps
–
installa3on
of
new
high
service
pumps
for
opera3onal
performance
and
energy
 savings New
System
Storage
Tank
–
Installa3on
of
a
5
million
gallon
storage
tank
to
provide
addi3onal
system
 redundancy
and
opera3onal
flexibility Renova3ons
at
Buffalo
Sewer
Authority

Freeport

NY

CDBG

Freeport

NY

CDBG

Freeport

NY

Freeport

Funding
Required 










7,500,000


Jobs 280












3,000,000


100












4,000,000


120












4,000,000


120












2,000,000


60












4,000,000


120












4,000,000


120












5,000,000


150












5,000,000


150












5,000,000


160












7,000,000


180












7,000,000


280










40,000,000


1600

162‐164
North
Main
Street














200,000


5

81‐83
South
Main
Street














200,000


5

CDBG

18
East
Sunrise
Highway














300,000


6

NY

CDBG

Downtown
comm.
Rehab
for
159‐167
North
Main
Street














300,000


8

Freeport

NY

Energy

Supplemental
Solar
Hea3ng
for
Rec.
Center
pools














250,000


10

Freeport

NY

Energy

Installa3on
of
energy
efficient
hea3ng
system
and
solar
panels
at
Frpt.
Recrea3on
Ctr.












1,500,000


15

Freeport

NY

Energy

Fuel
cells
for
Electric
Offices
site
to
take
load
from
Electric
Grid












3,500,000


20

Freeport

NY

Energy

Fuel
cells
for
Village
Hall
‐
install
fuel
cell
at
Village
Hall
site
to
take
load
from
Village
Hall
Electric
grid












3,500,000


20

Freeport

NY

Energy














250,000


20

Freeport

NY

Energy












1,000,000


30

Freeport

NY

Energy

Install
LED
parking
field
ligh3ng
‐
replace
exis3ng
HPS
or
MH
parking
field
street
ligh3ng
w/
LED
parking
street
 ligh3ng Purchase
20
full
electric
cars
(Village
use),
build
solar
parking
structures
at
3
loca3ons
to
accommodate
parking
 &
charging
of
vehicles Install
100KW
grid
connected
solar
array
w/
real
3me
online
sta3s3cs
accesible
to
everyone












1,100,000


40

Freeport

NY

Energy

Replace
exis3ng
emmission
control
system
reducing
NOX
&
CO
emissions
from
village
gas
turbine












6,500,000


40

Freeport

NY

Energy












3,000,000


50

Freeport

NY

Energy

Site
&
develop
alterna3ve
fuel
filling
sta3on.
Sta3on
would
have
Solar
charging
sta3ons
for
Electric
vehicles,
 compress
natural
gas
fill
sta3on,
biodiesel
filling
sta3on,
E85
ethanol
filling
sta3on Install
Geothermal
hea3ng
&
cooling
at
Rec.
Center,
Village
Facili3es,
Library












4,500,000


150

Freeport

NY

Public
Safety

7
Months
Police
academy
salaries,
5
Months
increased
rate
salaries,
shib
and
holiday
salaries














710,841


11

Freeport

NY

Public
Safety

Fringe
Benefits‐FICA/MEDI,
Medical/Dental/Re3rement














268,931


11

Freeport

NY

Public
Safety

Maintenance
‐Uniform/Equipment
















12,100


11

Freeport

NY

Streets/Roads

Rehabilita3on
of
parking
field
#11
and
#12












3,000,000


25

Freeport

NY

Streets/Roads












1,840,000


30

Freeport

NY

Streets/Roads

2009
Road
Improvement
Project
for
N.
Columbus
Ave.,
Washington
St.,
Archer
St.,
Cary
Pl.,
Davison
Pl.,
Lewis
 St.,
May
Ct.,
Prince
Ave. Road
Improvement
&
Grade
Raise
Project
for
South
Ocean
Ave.,
Miller
Ave.,
Nassau
Ave.












4,700,000


53

Freeport

NY

Water

Sewer
Relining
Program
that
will
stop
infiltra3on
of
ground
water
into
sewer
lines












2,000,000


30

Freeport

NY

Water

Replace
aging
4
inch
(undersized)
water
mains












4,000,000


40

Hempstead

NY

CDBG

Build
an
indoor
soccer
field












1,000,000


20

Hempstead

NY

CDBG

refurish
sanita3on
building














300,000


25

Hempstead

NY

CDBG

Expand
Library
‐
Green












5,000,000


100

Hempstead

NY

CDBG

Expand
Village
Hall
‐
Green










15,000,000


100

Hempstead

NY

CDBG












8,000,000


200

Hempstead

NY

Energy

Build
Recrea3on
Center
on
Terrace
Ave 1.
Basketball
Courts
4 2.
Classroms
for
tutoring 3.
Exercise
Rooms
5 Install
solar
panels
on
village
buildings
and
new
water
heaters
&
broilers

Hempstead

NY

Housing

Affordable
homes
50
‐
Green

Hempstead

NY

Public
Safety

Hempstead

NY

Public
Safety

Hempstead

NY

Public
Safety

Shot
spofer
cameras












1,000,000


10

Hempstead

NY

Public
Safety

Build
new
police
hq










10,000,000


300

Hempstead

NY

Schools

Build
new
schools
2











50,000,000


500

Hempstead

NY

Streets/Roads

Improve
all
streets
in
Hempstead










20,000,000


300

Hempstead

NY

Transit

Replace
all
calls
with
hybrids












5,000,000


Hempstead

NY

Water

Cover
for
water
system












4,000,000


20

Hempstead

NY

Water

Replace
aging
sewer
system
and
road
repair.
Washington,
Clinton,
sewer
pumping
sta3ons










10,000,000


30

Hempstead

NY

Water

Dig
water
wells
‐
3










10,000,000


50

Jamestown

NY

Streets/Roads

Rehabilita3on
of
the
Spring
Street
Parking
Ramp.

The
project
consist
of
major
structural
repairs
to
a
5‐level
 open
parking
structure
owned
by
the
City
of
Jamestown,
which
is
the
primary
parking
feature
in
the
City’s
 Central
Business
District













1,700,000


30












1,000,000


20










15,000,000


200

20
New
Hybrid
cars














200,000


10

New
radio
system














500,000


10

City

State

Program

Jamestown

NY

Streets/Roads

Jamestown

NY

Streets/Roads

New
Rochelle

NY

CDBG

New
Rochelle

NY

Energy

New
Rochelle

NY

Public
Safety

New
Rochelle

NY

Streets/Roads

New
Rochelle

NY

Streets/Roads

New
Rochelle

NY

Streets/Roads

New
Rochelle

NY

Water

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Energy

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Project
Descrip3on Par3al
Reconstruc3on
of
W.
5th
Street
(State
Touring
Route
394)
from
Fairmount
Avenue
to
Washington
Street.

 The
project
consists
of
par3al
reconstruc3on
of
the
six
(6)
blocks
of
W.
5th
Street
which
is
currently
owned
by
 the
City
(see
the
enclosed
map Par3al
Reconstruc3on
of
W.
6th
Street
(State
Touring
Route
394)
from
Fairmount
Avenue
to
Clinton
Street,
and
 from
Washington
Street
to
N.
Main
Street.

The
project
consists
of
par3al
reconstruc3on
of
the
five
(5)
blocks
 of
W.
6th
Street
which
is
curre This
project
represents
the
third
of
a
three‐phased
project
to
improve
the
North
Avenue
Corridor.

The
benefits
 include
road
widening,
new
sidewalks
with
granite
curbs,
street
paving,
decora3ve
ligh3ng,
tree
plan3ng,
new
 striping
of
crosswalks
and
park This
project
would
augment
the
boiler
and
HVAC
system
renovaitons
in
terms
of
savings
on
fuel
and
energy
 costs
by
replacing
an3quated
inefficient
single
glaze,
aluminum
frame
windows
with
high
efficiency
insulated
 double
glaze
windows
 Security
Camera
Network The
project
will
install
20
cameras
in
sensi3ve
loca3ons
throughout
the
City,
including
the
New
Rochelle
Transit
 Center,
the
Central
Business
District,
and
other
areas
iden3fied
by
law
enforcement
personnel. North
Avenue
Resurfacing RESURFACING
AND
JOINT
REPAIR
OF
NORTH
AVENUE,
SOUTH
OF
MAIN
STREET
AND
IN
WYKAGYL.
A
MUCH
 NEEDED
IMPROVEMENT
ALONG
ONE
OF
THE
CITY'S
MAJOR
THOROUGHFARES.
RESURFACING
OF
THE

STREET
 PAVEMENT
IS
NECESSARY
IN
THIS
SECTION
 Main
Street
Resurfacing
(mill
and
fill)
 This
project
would
bolster
our
City‐wide
roadway
improvements
in
the
major
economic
corridor
of
the
City.

 Street
resurfacing
city‐wide This
project
would
bolster
the
annual
street
resurfacing
by
addressing
problem
areas,
and
suppor3ng
 infrastructure
improvements.
 Marina
Dredging
 This
project
will
dredge
parts
of
municipal
marina
due
to
the
accumula3on
of
solid
materials
sefling
at
its
 bofom
and
displacing
the
water
volume
and
storage
capacity.

The
municipal
marina
is
an
economically
viable
 enterprise
 Revitalizing
Vacant
Proper3es
with
Clean
Energy
Systems Grant
funding
will
be
provided
for
the
improvement
of
vacant
single
family
homes
that
can
be
transformed
to
 sustainable
owner
occupied
proper3es,
and
in
implemen3ng
clean
energy City
Facili3es
Energy
Efficiency
Program Make
upgrades
to
ligh3ng
systems,
replace
all
incandescent/
fluorescent
exit
signs
to
LED,
install
Energy
Star
 windows/film
3n3ng,
and
improve
building
insula3on
at
18
different
City‐owned
facili3es Rochester
Riverside
Conven3on
Center
Energy
Upgrades Make
upgrades
to
exis3ng
ligh3ng
systems,
cooling
tower,
and
electronic
signage
to
obtain
significant
energy
 efficiency
benefits.
 Chestnut
Street
Firehouse
HVAC
Upgrades Descrip3on:
Upgrade
exis3ng
inefficient,
aging
(exis3ng
system
is
roughly
70
years
old)
steam
HVAC
system
in
 historic
downtown
firehouse
to
modernize
and
increase
efficiency. Mercury
Vapor
Streetlight
Replacement
Project Descrip3on:
Replace
exis3ng
inefficient
mercury
vapor
street
lights
with
more
efficient
high
pressure
sodium
 and/or
LED
ligh3ng
systems
to
increase
ligh3ng
(from
.5
lumens
to
~1
lumen)
and
decrease
energy Blue
Cross
Arena
Energy
Efficiency
Upgrades Descrip3on:
Make
series
of
HVAC
and
mechanical
upgrades
to
indoor
sports
arena
to
reduce
large
load
swings
 during
ice‐making.
Project
is
the
result
of
a
NYSERDA
study
and
will
pay
back
its
investment
within
4
 Edgerton
Recrea3on
Center
Upgrades Descrip3on:
Upgrade
exis3ng
inefficient
ligh3ng
and
HVAC
systems
in
a
historic
neighborhood
community
 center
facility. Cost:
$1.315
million Energy
Cost
Savings:
TBD GHG
Emissions
Reduc3on:
TBD Direct
Jobs
Creat Rundel
Library
HVAC
Upgrades Descrip3on:
Replace
aging
inefficient
HVAC
system
in
opera3on
for
more
than
30
years
at
historic
landmark
 central
library
building
with
new
high‐efficiency
HVAC
system Cost:
$2.2
million Energy
Cost
Savings:
$88,000/year Stutson
Street
Reconstruc3on‐Reconstruct
Stutson
Street
between
Lake
Avenue
and
River
Street
to
replace
 failing
pavement,
narrow
the
street,
and
widen
sidewalks
to
support
con3nued
revitaliza3on
of
the
Port
of
 Rochester
area. 
Orchard‐Whitney
Brownfield
Site
 To
help
finance
the
environmental
cleanup
of
a
four
acre
Brownfield
Site
located
at
354
Whitney
Street
and
 415
Orchard
Street.

A
$200,000
grant
applica3on
was
submifed
for
this
project
to
the
US
EPA 2009
Bridge
Maintenance
Program Double
the
scope
of
the
City’s
currently‐programmed
Bridge
Maintenance
Program
to
accomplish
more
 comprehensive
maintenance
of
the
City’s
many
bridges;
oben
considered
the
most
cri3cal
links. Cultural
District
Sidewalk
Replacement Replace
or
rehabilitate
exis3ng
brick
sidewalks
in
the
Cultural
District
of
Downtown
Rochester
to
improve
 pedestrian
safety
and
accessibility
in
a
vibrant
mixed‐use
neighborhood. La
Avenida
Streetscape
Improvements 
Construct
enhancements
to
the
North
Clinton
Avenue
(La
Avenida)
streetscape
between
Upper
Falls
Boulevard
 and
Avenue
D
to
support
economic
development
in
an
ethnically‐diverse,
economically‐distressed
area South
Clinton/Mount
Hope
Enhancements Construct
curb
extensions,
install
new
sidewalks
and
crosswalks,
and
enhance
ligh3ng
in
order
to
calm
traffic
 and
improve
the
pedestrian
environment
on
South
Clinton
Avenue Brooks
Avenue
Reconstruc3on Reconstruct
Brooks
Avenue
between
Genesee
Park
Boulevard
and
the
Erie
Canal/West
City
Line
to
address
 traffic
safety
and
efficiency,
improve
the
pedestrian
environment,
and
create
an
afrac3ve
gateway


Funding
Required

Jobs














950,000


35














720,000


35












3,000,000


100












1,750,000


50














190,000


50














375,000


20












3,000,000


50












5,000,000


50












2,000,000


50












1,500,000















500,000















400,000















575,000


4












1,100,000


4














831,000


5












1,315,000


8












2,200,000


8














400,000


20














200,000


25












1,100,000


26












1,100,000


26












1,100,000


26












1,250,000


31












1,775,000


44

City

State

Program

Rochester

NY

Streets/Roads

Project
Descrip3on

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Streets/Roads

Rochester

NY

Water

Rochester

NY

Water

Rochester

NY

Water

Schenectady

NY

Amtrak

Mt.
Hope
Avenue
Reconstruc3on
–
Phase
1 Reconstruct
Mount
Hope
Avenue,
an
NHS
Principal
Arterial,
between
Elmwood
Avenue
and
Rossiter
Road,
to
 address
cri3cal
safety
deficiencies,
mi3gate
significant
traffic
conges3on,
improve
walkabil 
ARTWalk
2 Construct
an
extension
to
the
successful
ARTWalk
urban
art
trail,
pedestrian
safety
improvements
at
East
 Avenue
and
North
Goodman
Street,
a
public
gateway
plaza
adjacent
to
the
Rochester
Museum
&
Science
 Center,
and
public
art. Broad
Street
Tunnel Rehabilitate
deteriora3ng
subway
tunnel
underneath
Broad
Street
in
Downtown
Rochester
to
address
cri3cal
 safety
deficiencies,
rehabilitate
surface
street
above
tunnel,
and
add
context‐sensi3ve
ameni3es Charlofe
(West)
/Summerville
(East)
Pier
Safety
Enhancement To
make
needed
improvements
and
enhance
the
recrea3onal
u3lity,
naviga3on
safety
and
performance
of
the
 piers,
the
City
of
Rochester
requests
Army
Corps
funding
to
conduct
 425‐435
Mount
Hope
Site
Environmental
Remedia3on
Project Erie
Harbor
on
the
Genesee
River Environmental
remedia3on
of
land
adjacent
to
the
Genesee
River
in
downtown
Rochester
to
facilitate
 riverfront
development. Durand
Eastman
Beach
Water
Quality
Improvements To
make
needed
water
quality
improvements
at
Durand
Eastman
Beach
on
Lake
Ontario.
The
project
will
install
 a
low
flow
Smart
Sponge
Filter
Treatment
at
the
Camp
Eastman
tributary
discharge Funds
to
be
used
for
the
Schenectady
Amtrak
Sta3on
replacement
and
improvements.

Schenectady

NY

CDBG

Schenectady

NY

CDBG

Schenectady

NY

Schenectady

East
Henriefa
Road
Reconstruc3on Reconstruct
East
Henriefa
Road,
from
Mount
Hope
Avenue
to
the
Erie
Canal/City
Line,
to
address
failing
 pavement
and
drainage,
improve
the
pedestrian
environment,
and
improve
the
general
appearance
 2009
Hazardous
Sidewalk
Replacement
Program Double
the
scope
of
the
City’s
currently‐programmed
Hazardous
Sidewalk
Replacement
Program
for
2009
to
 repair
or
replace
significantly
more
hazardous
sidewalks
to
improve
mobility Genesee
Riverway
Trail
Rehabilita3on Rehabilitate
the
heavily‐used
southern
segment
of
the
Genesee
Riverway
Trail,
a
mul3‐use
trail
along
both
 sides
of
the
Genesee
River,
between
Ford
Street
and
the
Erie
Canal.

Funding
Required

Jobs












2,000,000


48












2,000,000


49












2,000,000


49












2,200,000


50












2,500,000


60












3,000,000


72












5,000,000


231












3,300,000


303










10,000,000


756












1,000,000


25












1,000,000


25












1,600,000


40












8,700,000


72

Funds
to
be
used
for
CDBG
neighborhood
water/sewer
improvements.












6,000,000


20












1,000,000


25

CDBG

Funds
to
be
used
for
the
new
construc3on
of
a
16
unit
homeless
shelter
in
the
City
of
Schenectady,
which
will
 resolve
chronic
homelessness
in
Schenectady
County. Funds
to
be
used
for
the
new
construc3on
of
Universal

Design/Green
Affordable
Housing
(10
units).












3,000,000


27

NY

CDBG

Funds
to
be
used
for
the
demoli3on
of
dilapidated
structures
impac3ng
public
health
and
safety.












3,000,000


40

Schenectady

NY

CDBG

Funds
to
be
used
for
CDBG
neighborhood
street
rehabilita3on.










15,000,000


52

Schenectady

NY

CDBG

Funds
to
be
used
for
the
new
construc3on
of
the
City
of
Schenectady's
Public
Works
Facility.










22,000,000


80

Schenectady

NY

Energy

Funds
to
be
used
to
reduce
energy
use
at
the
water
treatment
plant
(metered
system).










15,000,000


15

Schenectady

NY

Energy














200,000


16

Schenectady

NY

Energy












2,000,000


20

Schenectady

NY

Housing

Funds
to
be
used
for
renewable
energy
features(solar,
photovoltaics)
for
10
units
of
Universal
Design/Green
 Affordable
Housing. Funds
to
be
used
to
reduce
Schenectady's
carbon
footprint/reduce
energy
costs
by
replacing
original
windows
 on
Schenectady
City
Hall
(c.
1932)
and
the
reconstruc3on
of
the
original
skylight.
 Funds
to
be
used
for
the
moderniza3on
of
the
Schenectady
Municipal
Housing
Authority's
housing
units.














700,000


36

Schenectady

NY

Public
Safety

Funds
to
be
used
for
COPS‐funded
police
personnel.














450,000


6

Schenectady

NY

Public
Safety

Funds
to
be
used
for
a
centralized
public
safety
dispatch
center.















500,000


10

Schenectady

NY

Public
Safety














800,000


10

Schenectady

NY

Public
Safety

Funds
to
be
used
for
police
technology
equipment
including
security
cameras
and
for
a
crime
tracking
data
 base. Funds
to
be
used
for
Schenectady
Police
Sta3on
improvements
including
equipment.














100,000


16

Schenectady

NY

Schools










55,000,000


296

Schenectady

NY

Streets/Roads

Funds
to
be
used
for
the
construc3on
of
the
"Science
Center
of
Tech
Valley",
a
regional
science
educa3on
 center
in
the
City
of
Schenectady
(LEED‐cer3fied
"green"
building).
 Funds
to
be
used
for
Upper
Union
Street
streetscape
improvements.












3,000,000


22

Schenectady

NY

Streets/Roads

Funds
to
be
used
for
Nof
Terrace
streetscape
improvements.












5,000,000


27

Schenectady

NY

Streets/Roads

Funds
to
be
used
for
Van
Vranken
Avenue
streetscape
improvements.












5,000,000


27

Schenectady

NY

Streets/Roads

Funds
to
be
used
for
citywide
street
and
sidewalk
rehabilita3on.










10,000,000


35

Schenectady

NY

Streets/Roads

Funds
to
be
used
for
State
Street

transporta3on
oriented
development
streetscape
improvements.












7,000,000


35

Schenectady

NY

Water

Funds
to
be
used
for
the
North
Ferry
Pump
Sta3on
upgrade.














700,000


7

Schenectady

NY

Water

Funds
to
be
used
for
a
gravity
belt
thickener.














200,000


8

Schenectady

NY

Water

Funds
to
be
used
for
Oneida
Street
storm
sewer
improvements.












1,500,000


15

Schenectady

NY

Water

Funds
to
be
used
for
the
replacement
of
water
transmission
mains.












3,500,000


15

Schenectady

NY

Water

Funds
to
be
used
for
co‐genera3on
using
digester
gas.












3,000,000


22

White
Plains

NY

Housing

86
Dekalb
Ave
Apartment
Door
Hardware
















90,000


2

White
Plains

NY

Housing

Maintenance
Equipment
















60,000


2

White
Plains

NY

Housing

Oil
Tank
Replacement














150,000


2

White
Plains

NY

Housing

Upgrade
of
Phone
Systems
















35,000


2

White
Plains

NY

Housing

120
Bath
Floors
















70,000


5

Genesee
River
Crossroads
Park
Plaza
Deck The
Genesee
River
Crossroads
Park
is
a
focal
point
for
public
access
and
gathering
along
the
Genesee.
It
is
in
 need
of
major
structural
repairs
to
the
plaza
deck
which
also
serves
as
the
roof
 Jefferson
Avenue
Revitaliza3on Design
and
construc3on
of
enhancements
to
Jefferson
Avenue
in
the
City’s
southwest
quadrant,
including
new
 sidewalks,
crosswalks,
ligh3ng,
curb
modifica3ons,
and
streetscape
improvements.
 2009
Milling
&
Resurfacing
Program Double
the
scope
of
the
City’s
currently‐programmed
Milling
and
Resurfacing
Program
to
accomplish
 significantly
more
preven3ve
maintenance
on
City
streets
in
2009.

City

State

Program

White
Plains

NY

Housing

120
Lake
Street
Apartment
Entry
Doors

Project
Descrip3on

Funding
Required 












200,000


Jobs

White
Plains

NY

Housing

86
Closet
Doors
















75,000


5

White
Plains

NY

Housing

86
DeKalb
Ave
Apartment
Entry
Doors














200,000


5

White
Plains

NY

Housing

Appliances:
Stoves,
Refrigerators,
for
120
Lake
Street
and
86
DeKalb














325,000


5

White
Plains

NY

Housing

Security
Upgrade
at
86
Dekalb
and
120
Lake
Street












1,000,000


5

White
Plains

NY

Housing

Stair
Treads
for
Lake/DeKalb/Winbrook














100,000


5

White
Plains

NY

Housing

Upgrade
of
Master
Antenna
Systems
7
Bldgs














250,000


5

White
Plains

NY

Housing

Addi3on
of
Electric
Meters
for
95
Units
at
120
Lake
Street












1,000,000


10

White
Plains

NY

Housing

Elevator
Rehabs
at
120
Lake
Street

White
Plains

NY

Housing

Addi3on
of
Electric
Meters
for
167
Units
at
86
DeKalb
Ave

White
Plains

NY

Housing

White
Plains

NY

White
Plains

5














500,000


10












1,300,000


15

Winbrook
Development














300,000


20

Housing

1200
Windows
at
86
Dekalb
Ave
at
450/opening














550,000


25

NY

Housing

500
Windows
at
120
Lake
St
at
450/opening














225,000


25

Akron

OH

Airport

Airport
Runway
Crack
Repair
















40,000


Akron

OH

Airport

Airport
Taxiway
Extension














385,000


Akron

OH

Airport

Akron
Fulton
Airport,
Rehabilitate
Parallel
Taxiway
“P”
(Construc3on)

Akron

OH

Amtrak

New
Sta3on
by
Bus
terminal

Akron

OH

CDBG

Barbara
Avenue
Public
Improvements
(storm
sewer,
asphalt
reconstruc3on,
curbs,
and
sidewalk).

Akron

OH

CDBG

Bartges
Street
Bridge
Replacement
over
Ohio
Canal

Akron

OH

CDBG

Akron

OH

CDBG

Crouse
Street
Public
Improvements
(water
main
&
storm
sewer
reconstruc3on,
asphalt
reconstruc3on,
curbs,
 and
sidewalk). Dover
Avenue
et
al
Public
Improvements
(storm
sewer,
asphalt
reconstruc3on,
curbs,
and
sidewalk).

Akron

OH

CDBG

Edgewood
Homes
Hope
VI
Public
Improvements
Ph.2












1,532,000


Akron

OH

CDBG

Goodyear
Sewer
Lining
and
Reloca3on
–
Eastgate
Development












3,665,000


Akron

OH

CDBG

Hazel
St.
Bridge
Replacement
over
L.
Cuyahoga
River












1,222,000


Akron

OH

CDBG

Martha
Avenue
Reconstruc3on
–
Eastgate
Development












1,894,000


Akron

OH

CDBG

Newton
St.
Bridge
Replacement
over
Roosevelt
Ditch

Akron

OH

CDBG

North
Hawkins
Avenue
Concrete
Repairs

Akron

OH

CDBG

Overlook
Drive
Public
Improvements














149,000


Akron

OH

CDBG

Rosalind
Court
/
Gotham
Court
Pavement
Reconstruc3on














462,000


Akron

OH

CDBG

Tech
Way
Public
Road
Improvements

Akron

OH

CDBG

Firestone
Parkway
(Wilbeth
to
Firestone
Blvd)
Roadway
Improvements












2,000,000


10

Akron

OH

CDBG

Bridgestone
Infrastructure
S.
Main
Street
(Waterloo
to
Dartmore)
Broadway
Improvements












5,000,000


15

Akron

OH

CDBG










12,000,000


15

Akron

OH

CDBG

Cascade
Deck
Improvements
(LED
light
fixtures
and
ceiling
paint
for
energy
saving,
sprinkler
system
 replacement) Cascade
Plaza
Improvements
–
Structural
repair
to
top
of
Cascade
Parking
Deck










10,000,000


15

Akron

OH

CDBG












1,200,000


15

Akron

OH

CDBG

Morley
Parking
Repair
deteriorated
concrete,
waterproof
all
parking
levels,
replace
ligh3ng
fixtures,
replace
 signage,
paint
and
install
new
garage
access
system. Wilbeth
(Firestone
Parkway
to
Dallas
Roadway
Improvements












4,500,000


15

Akron

OH

CDBG












1,500,000


20

Akron

OH

CDBG










14,000,000


25

Akron

OH

CDBG










50,000,000


30

Akron

OH

CDBG












5,000,000


50

Akron

OH

CDBG

Akron

OH

CDBG

Acquire
and
restore
blighted
buildings
for
the
purpose
of
suppor3ng
small
inner‐city
businesses
by
housing
 start‐up
businesses
that
are
now
struggling
to
gain
a
foothold
while
working
out
of
their
homes
and
garages.

 Large
buildings
would
be
renovated
in Restore
and
build
out
655
South
Broadway
as
an
expansion
of
Akron’s
global
business
accelerator
for
the
 emerging
“green”
technologies Goodyear
–
Infrastructure
(2009‐2010)
‐‐
Water
and
Sewer
&
River
Enhancement

Akron

OH

CDBG

Akron

OH

CDBG

Akron

OH

Akron

Construct
a
15,000
square
foot
building
and
laboratory
for
a
new
polymer
company
in
Akron’s
Ascot
Industrial
 Park
that
is
considering
reloca3ng
to
South
Carolina Construc3on
of
a
100
to
110
room
hotel
next
to
the
Akron/Summit
Conven3on
and
Visitors
Bureau
to
assist
in
 afrac3ng
more
conven3ons Municipal
Service
Center/APUB
Maintenance
Combina3on
Center














902,500
 








15,000,000


100














450,000
 










2,695,000
 












722,000
 












883,000















369,300
 










1,806,000















704,000













2,000,000


50












8,000,000


100

Market
Forge
Renewal
Area












1,500,000


150

Bio‐Medical
Corridor












1,000,000


200

CDBG

Bridgestone
Firestone
(2009‐2010)












2,000,000


200

OH

CDBG

Brown‐Graves
Infrastructure












1,000,000


250

Akron

OH

CDBG

Lock
3
Redevelopment
–
reconstruc3on
of
Ohio
Canal
(storm
sewer)












3,000,000


250

Akron

OH

CDBG












4,000,000


300

Akron

OH

CDBG

Provide
leasehold
improvements
to
60,000
square
feet
of
an
exis3ng
building
and
build
a
300‐space
parking
 deck
to
accommodate
the
corporate
headquarters
of
a
health‐related
ins3tu3on White
Pond
Industrial
Park
–
Infrastructure












1,000,000


500

Akron

OH

Energy

Copley
Road
Depot
Renova3on
Renovate
Service
Center
to
be
LEED
Cer3fied












5,000,000


Akron

OH

Energy

Fire
Sta3ons
Miscellaneous
Equipment
















75,000


Akron

OH

Energy

Morley
HVAC
Replacement














330,000


Akron

OH

Energy

Municipal
Building
Chiller
Replacement














325,000


Akron

OH

Energy

Municipal
Building
Roof
HVAC
Units
Replacement














100,000


Akron

OH

Energy

Municipal
Service
Center
Improvements














480,000


Akron

OH

Energy

Stubbs
Jus3ce
Center
Electrical
Upgrade














500,000


Akron

OH

Energy

Green
LED
replacement
in
traffic
signal














290,000


4

Akron

OH

Energy

Yellow
LED
replacement
in
traffic
signals














200,000


4

Akron

OH

Energy

Muni
Building
Restrooms














100,000


5

Akron

OH

Energy

Ped
light
replacement
in
traffic
signals














365,000


5

Akron

OH

Energy

Red
Led
replacement
in
traffic
signals














150,000


5

Akron

OH

Energy

Solar
Panels
at
Triplef












1,000,000


8

Akron

OH

Energy

Installa3on
of
solar
array
at
METRO
facili3es












1,000,000


10

City

State

Program

Akron

OH

Energy

State
Expressway
Vegeta3on

Project
Descrip3on

Akron

OH

Energy

Akron

OH

Energy

Akron

OH

Energy

Brewster
Creek
‐
reconstruc3on
to
realign
and
re‐establish
the
banks
for
the
creek
to
prevent
flooding
of
the
 neighborhood Confluence
Park
‐
to
provide
and
upgrade
a
blighted
area
along
the
canal
and
towpath
for
wetlands
adn
parks
 in
southwest
Akron City
of
Akron
Service
Center
Rehab
service
center
on
Market
St.
to
be
LEED
cer3fied

Akron

OH

Energy

Akron

OH

Akron

Funding
Required Jobs 








15,000,000
 15 










5,000,000


20












8,000,000


30










10,000,000


40

Muni
Building
green
restora3on












8,000,000


40

Energy

Municipal
Service
Center
Renova3on
Renovate
Service
Center
to
be
LEED
cer3fied










20,000,000


50

OH

Energy










40,000,000


75

Akron

OH

Energy

Akron

OH

Energy

State
Route
59
‐
Realignment
Reconstruct
a
por3on
of
expressway
through
downtown
to
provide
areas
for
 economic
development
and
job
growth Trash
Transfer
Sta3on
‐
construct
a
new
eco‐friendly
city
trash
transfer
sta3on
to
accommodate
and
obscure
 the
transfer
of
trash
from
the
residents.

This
will
be
a
LEEd
cer3fied
building Court
House
Annex

Construct
court
annex
to
accommodate
more
courts
‐
LEED
cer3fied

Akron

OH

Energy

Akron

OH

Energy

Akron

OH

Akron










20,000,000


75










20,000,000


100

Municipal
Building
Green
Renova3on
Renovate
City
building
to
be
LEED
cer3fied










20,000,000


100

Steam
U3lity
upgrade










50,000,000


150

Energy

Harold
K.
Stubbs
Building
‐
Police
Department
Rehabilitate
or
build
new
building
for
Police
Department










40,000,000


200

OH

Housing

Addi3onal
demoli3on
work
on
Raymond
Mallison
Apartments














150,000


Akron

OH

Housing

Addi3onal
vehicle
fleet/replacement
with
fuel
efficient
models












2,800,000


Akron

OH

Housing

Capital
funds
for
Hope
VI
comple3on
due
to
drop
o
tax
credits












1,000,000


Akron

OH

Housing

Construc3on
funds
for
special
needs
housing
units
(par3al
costs)












1,000,000


Akron

OH

Housing

Replacement
garages
@
50
units














750,000


Akron

OH

Housing

Replacement
housing
units
20@20,000
inclusive
of
professional
serivces














400,000


Akron

OH

Housing

Akron

OH

Housing

Scafered
site
housing
site
work landscapping
500
units
@
2,000 Security
technology‐cameras,
electric
locks

Akron

OH

Housing

Saferstein
Towers‐restore
historic
walls














200,000


4

Akron

OH

Housing

Cofer
Building‐balcony
repair
and
waterproofing














150,000


5

Akron

OH

Housing

Fleet
vehicles
replacement‐energy
conserva3on














850,000


6

Akron

OH

Housing

Honey
Locust
Family
Apartments
parking
repair














350,000


6

Akron

OH

Housing

Raymond
Mallison
apartments‐par3al
demo














150,000


6

Akron

OH

Housing

Nimmer
Place
repair
retaining
wall














150,000


8

Akron

OH

Housing

Edgewood
Village‐construct
commercial
space












1,500,000


10

Akron

OH

Housing

Green
energy
audits
and
plans
for
buildings














750,000


10

Akron

OH

Housing

Informa3on
technology
–new
system
for
asset
management












1,500,000


10

Akron

OH

Housing

Various
office
building
renova3ons
due
to
age












1,500,000


10

Akron

OH

Housing

Colonial
Hills
Family
Apartments‐interior
work












2,500,000


12

Akron

OH

Housing

Senior
building
interior
replacement












1,000,000


12

Akron

OH

Housing

Edgewood
Village
Hope
VI‐Phase
I
V‐public
streets












1,000,000


15

Akron

OH

Housing

Edgewood
Village
Phase
V‐streets












1,000,000


15

Akron

OH

Housing

Public
safety
upgrades‐various
sites












1,000,000


15

Akron

OH

Housing

Washington
Square‐renova3ons
–
24
units














800,000


15

Akron

OH

Housing

Edgewood
Village
housing
units












2,000,000


20

Akron

OH

Housing

Edgewood
Village
Phase
V‐housing
units












2,000,000


20

Akron

OH

Housing

Lauer
Senior
Building‐rehabilita3on
work












3,000,000


20

Akron

OH

Housing

Nimmer
Place
Senior
Tower
interior
work












4,000,000


24

Akron

OH

Housing

Various
replacement
housing‐single












2,400,000


25

Akron

OH

Housing

Saferstein
Towers‐renova3on












4,000,000


30

Akron

OH

Public
Safety

Byrne
and
Jus3ce
Assistance
Grant
–
To
purchase
addi3onal
cruisers
and
police
equipment

Akron

OH

Public
Safety










10,000,000


Akron

OH

Public
Safety

Police/Fire
Training
Center Build
a
joint
facility
in
which
both
Fire
and
police
departments
can
provide
training
for
their
respec3ve
 departments Safety
Communica3ons
Project
–
Comple3on
of
county‐wide
communica3ons
system

Akron

OH

Public
Safety

COPS
Officers












1,200,000


15

Akron

OH

Schools

McEbright
Elementary
School












9,000,000


60

Akron

OH

Schools

Portage
Path
Elementary
School












8,000,000


60

Akron

OH

Schools

Shumacher
Elementary
School












9,000,000


60

Akron

OH

Schools

Windemere
Elementary
School












9,000,000


60

Akron

OH

Schools

Hyre
Middle
School










18,000,000


75

Akron

OH

Schools

Buchtel/Perkins
High
School










30,000,000


90

Akron

OH

Schools

East/Goodyear
High
Schol










28,000,000


90

Akron

OH

Streets/Roads












1,500,000


Akron

OH

Streets/Roads

Brine
Mixing
Sta3on
and
Salt
Storage
Facility
at Copley
Road
Depot
and
Evans
Ave.
facili3es Design
to
central
interchange
project

Akron

OH

Streets/Roads

Expressway
Ligh3ng
Maintenance

Akron

OH

Streets/Roads

I‐77
Landscaping
(Copley
Rd
–
S.R.
21)

Akron

OH

Streets/Roads

I‐77
Minor
Rehab
(Central
Interchange
‐
s.
corp.
line)












6,950,000


Akron

OH

Streets/Roads

In‐place
Asphalt
Recycle
Equipment
for
Two
Paving
Trains












4,200,000


Akron

OH

Streets/Roads

Install
Safelane
Deicing
Pavement
on
Expressway
Bridges












6,000,000


Akron

OH

Streets/Roads












5,500,000


Akron

OH

Streets/Roads

Install
Safelane
Deicing
Pavement
on
Hills:

Merriman,
Portage
Path,
Smith
Road,
MemorialParkway,
Tallmadge
 Avenue,
Eastland,
Clearview,
Brifain
Road,
Howard
Street New
Roadway
Access
to
Municipal
Service
Center
from
Kelly
Avenue

Akron

OH

Streets/Roads

Sidewalk/Ramp
Program












4,000,000













2,000,000
 










1,000,000















500,000













3,400,000











50,000,000
 












400,000
 












900,000













1,000,000


City

State

Program

Akron

OH

Streets/Roads

Various
roadway
resurfacing

Project
Descrip3on

Funding
Required Jobs 








15,000,000


Akron

OH

Streets/Roads

School
Flasher
Paging
System
Citywide














125,000


2

Akron

OH

Streets/Roads

Downtown
Wireless
Signal
Upgrade














150,000


4

Akron

OH

Streets/Roads

Miscellaneous
Trafic
Control
Devices
citywide
















25,000


4

Akron

OH

Streets/Roads

Sign
Inventory
Management
System












1,500,000


4

Akron

OH

Streets/Roads

Triplef
Blvd
Signals
Upgrade














320,000


4

Akron

OH

Streets/Roads

Brifain
Road
Signals
Upgrade












1,800,000


5

Akron

OH

Streets/Roads

Brown
Street
Signals
Road
upgrade












1,100,000


5

Akron

OH

Streets/Roads

Connector
road
to
transit
center












1,500,000


5

Akron

OH

Streets/Roads

Darrow
Road
Signals
upgrade














840,000


5

Akron

OH

Streets/Roads

Home
Ave
Signals
upgrade














600,000


5

Akron

OH

Streets/Roads

Kenmore
Blvd
Signals














500,000


5

Akron

OH

Streets/Roads

W.
Exchange
signals












1,800,000


5

Akron

OH

Streets/Roads

White
Pond
Infrastructure












2,000,000


5

Akron

OH

Streets/Roads

Crouse
Street
–
Public
Improvements
in
Spicertown
to
support
University
Park
Alliance














300,000


6

Akron

OH

Streets/Roads

Street
Name
Sign
Installa3on
and
Upgrade














500,000


6

Akron

OH

Streets/Roads














424,000


7

Akron

OH

Streets/Roads














230,000


8

Akron

OH

Streets/Roads

Tech
Way
to
construct
a
cul‐de‐sac
at
the
end
of
Tech
Way,
including
sewer
and
water
main
improvements
for
 Goodyear’s
future
development Dover
Avenue,
et
al
Reconstruct
curb,
aprons,
and
sidewalk
where
necessary
resurface
Dover
Avenue
from
 Diagonal
to
Bellevue
reconstruct
payment
on
Santee
Ave.,
East
Park
Blvd.
and
Genoa
Avenue Park
East
Towpath
Bridge
and
Resurfacing














650,000


8

Akron

OH

Streets/Roads

Waterloo
Road
Towpath
Trail














400,000


9

Akron

OH

Streets/Roads

AES
Bartges
Towpath














500,000


10

Akron

OH

Streets/Roads

Bartges
Street
Bridge
Replacement












1,500,000


10

Akron

OH

Streets/Roads

Bicycle
Facili3es
Implementa3on














300,000


10

Akron

OH

Streets/Roads

Train
Sta3on
Connector
Trail














850,000


10

Akron

OH

Streets/Roads

Waterloo
Road
Signals
Upgrade














580,000


10

Akron

OH

Streets/Roads

White
Pond
Office
Park‐grading












4,000,000


10

Akron

OH

Streets/Roads

Cedar
Street
Signals
Upgrade














750,000


12

Akron

OH

Streets/Roads












1,600,000


12

Akron

OH

Streets/Roads

Market
Street
Improvements
(Rose
to
Portage
Path)
Roadway
Reconstruc3on,
waterline
replacement,
storm
 sewer
installa3on N.
Arlington
Signals
Upgrade














860,000


13

Akron

OH

Streets/Roads

Massillon
Road
(Triplef
to
bridge
over
Lifle
Cuyahoga
River)












5,000,000


15

Akron

OH

Streets/Roads

Tallmadge
Avenue
widening
roadway
reconstruc3on
and
widening,

waterline
replacement












5,000,000


15

Akron

OH

Streets/Roads

Triplef
road
Improvements
(Hilbish
to
Seiberling)












8,000,000


15

Akron

OH

Streets/Roads

W.
Market
Signals
Upgrade
(Highland















800,000


15

Akron

OH

Streets/Roads












5,000,000


15

Akron

OH

Streets/Roads

Y‐Bridge
Fencing
and
Rehab
–
The
proposed
Y‐Bridge
Fence
project
will
design
and
construct
a
tubular
steel
 decora3ve
panel
fence
along
the
east
and
west
sides
of
the
bridge.

Rehabilita3on
and
deck
overlay. Brifain
Road
Bridge
over
Market‐Bridge
replacement
and
realignment












8,000,000


20

Akron

OH

Streets/Roads

W.
Market
Signal
Upgrade
(Highland‐Summit)












1,400,000


20

Akron

OH

Streets/Roads

Bridgestone‐roadway
construc3on












1,000,000


40

Akron

OH

Streets/Roads

Biomedical
Corridor
grading
project










12,000,000


50

Akron

OH

Streets/Roads

Goodyear
new
road
construc3on












5,000,000


50

Akron

OH

Streets/Roads

Hickory
Street
to
improve
the
sec3on
of
Hickory
St.
between
North
St.
and
Memorial
Parkway












5,000,000


50

Akron

OH

Streets/Roads

White
Pond
Drive












7,000,000


50

Akron

OH

Transit

20
less
than
30
foot
buses

Akron

OH

Transit

Bus
shelters

Akron

OH

Transit

Fareboxes












2,500,000


Akron

OH

Transit

Geothermal
Hea3ng
and
Cooling












1,500,000


Akron

OH

Transit

Internal
server
replacement

Akron

OH

Transit

New
Back
up
Generator












1,000,000


Akron

OH

Transit

New
CNG
compressors












2,000,000


Akron

OH

Transit

New
smart
card
fare
system














500,000


Akron

OH

Transit

Next
Bus
Des3na3on
signs












1,000,000


Akron

OH

Transit

North
Akron
Park
and
Ride












1,500,000


Akron

OH

Transit










18,000,000


Akron

OH

Transit

Opportunity
Park
South
Parking
Deck
provide
a
parking
compliment
to
the
Mul3model
Metro
Transit
Transfer
 facility Rehab
administra3on
building
and
parking
lot

Akron

OH

Transit

Rehab
maintenance
lot














500,000


Akron

OH

Transit

Rehab
maintenance
lot














500,000


Akron

OH

Transit

Parking
Lot
south
of
Gojo
deck














200,000


6

Akron

OH

Transit

Expansion
of
Ghent
Road
Park
and
Ride












1,000,000


10

Akron

OH

Transit

Security
cameras
on
buses












2,100,000


10

Akron

OH

Transit

Upgrade
Radio
and
safety
communica3ons
systems












3,500,000


10

Akron

OH

Transit

Upgrade
scheduling
and
rou3ng
capability
for
paratransit
and
demand
response
service












2,000,000


10

Akron

OH

Transit

Rebuild
maintenance
facili3es
and
buses
garages












5,000,000


15

Akron

OH

Transit

20
40‐foot
buses












7,000,000


20

Akron

OH

Transit

Rehabilita3on
of
railroad
trackage
and
bridges












5,000,000


25

Akron

OH

Water

Ac3on
Plan
Recommenda3ons
Equipment
Purchases














200,000


Akron

OH

Water

Annual
Sanitary
Sewer
Reconstruc3on














550,000


Akron

OH

Water

Bath
Road
Erosion
Control














736,000















500,000















500,000













2,000,000


City

State

Program

Akron

OH

Water

Brewster
Creek
Channel
Restora3on

Project
Descrip3on

Funding
Required 










3,500,000


Jobs

Akron

OH

Water

Akron

OH

Water

Cuyahoga
St.
Storm
Sewer Dillion‐Cascade
Valley
Park‐
resolve
chronic
flooding
problems
full
improvements Eastgate
Sewer
Reconstruc3on

Akron

OH

Water

Filter
Building
Instrumenta3on
&
Control
Upgrade














650,000


Akron

OH

Water

FirstEnergy
Deten3on
Pond














120,000


Akron

OH

Water

Lake
of
the
Woods
Pump
Sta3on














805,000


Akron

OH

Water

Main
Ouzall
Sewer
Rehabilita3on














550,000


Akron

OH

Water












5,000,000


Akron

OH

Water

Pigeon
Creek
Storm
Sewer
and
dredging

‐
resolve
chronic
flooding
problems
including
stream
restora3on,
 deten3on
and
storm
sewers Repair
of
main
valve
on
54"
force
main
to
insure
complete
closure.

Akron

OH

Water

Sanitary
Sewer
Reconstruc3on
2009












1,720,000


Akron

OH

Water

Storm
Water
U3lity
Plan
Development

Akron

OH

Water

Substa3on
Transformers
and
Switchgear
Replacement

Akron

OH

Water

Upgrade
of
DCS
supervisory
monitoring
and
control
system.

Akron

OH

Water

Ver3cal
Pushwall
Extension

Akron

OH

Water

Water
Main
repairs
of
48"
pipe
to
prevent
river
bank
failures.

Akron

OH

Water

Waterloo
Road
Wright
Sewer
JEDD

Akron

OH

Water

WPCS
Construc3on
of
flow
distribu3on
and
metering
devices.














680,000


Akron

OH

Water

Fairhill
Slope/Storm
Outlet
Repair














300,000


4

Akron

OH

Water

First
Energy
Pond














120,000


4

Akron

OH

Water

Force
Main
Valve
Replacement














250,000


4

Akron

OH

Water

Large
Valve
Replacement
Program














350,000


4

Akron

OH

Water

Misc
Storm
Water
2008














503,000


4

Akron

OH

Water

Misc
Storm
Water
2009












1,000,000


4

Akron

OH

Water

2nd
Street
Pump
Sta3on














500,000


5

Akron

OH

Water

Lake
of
the
Woods
Pump
Sta3on














825,000


5

Akron

OH

Water

Middlebury
Phase
II












1,200,000


5

Akron

OH

Water

Smith/Ghent
Deten3on
Green












1,500,000


5

Akron

OH

Water

Filter
Media
Replacement














125,000


6

Akron

OH

Water

Lagoon
Dredging














500,000


6

Akron

OH

Water

Middleton
Road
Bolt
Reinforcement












1,000,000


6

Akron

OH

Water

Northside
Interceptor
Rehab












1,200,000


6

Akron

OH

Water

Sand
Run
Parkway
Lining
Sanitary
Sewer












2,700,000


6

Akron

OH

Water

Tank
Farm
Security
Fencing
and
Gates














350,000


6

Akron

OH

Water

Waste
Water
Primary
Roof
Replacement














175,000


6

Akron

OH

Water

Water
Pump
Sta3on
Renova3ons












1,000,000


6

Akron

OH

Water

Albrecht
Ave
JEDD
Water
Line














740,000


7

Akron

OH

Water

JEDD
Water
Service
Extensions












2,000,000


7

Akron

OH

Water

Cleveland
Massillon
Rd
JEDD
Sanitary
Sewer














300,000


10

Akron

OH

Water

CSO
Separa3on
Projects










15,000,000


10

Akron

OH

Water

Mill
Street
Sewer
Reloca3on












2,400,000


10

Akron

OH

Water

Sanitary
Sewer
Reconstruc3on
2008














825,000


10

Akron

OH

Water

Cleaning
and
Lining












1,500,000


12

Akron

OH

Water

CSO
WPCS
Addi3on
Treatment










16,000,000


12

Akron

OH

Water

Montrose
High
Service
Conversion
Rothrock












1,400,000


12

Akron

OH

Water

Standby
Power
at
Water
Pump
Sta3ons














300,000


12

Akron

OH

Water

Waste
Water
Influent
Screen
Rebuild














200,000


12

Akron

OH

Water

Waste
Water
Influent
Screen
Rebuilt














200,000


12

Akron

OH

Water

CSO
WPCS
Secondary
Expansion












7,500,000


15

Akron

OH

Water

CSO
WPCS
Storage










34,000,000


15

Akron

OH

Water

SCADA
Improvements












1,000,000


15

Akron

OH

Water

Hudson
Water
System
Reinforcement












2,000,000


18

Akron

OH

Water

Substa3on
Equipment
Replacement












1,000,000


18

Akron

OH

Water

Tank
Pain3ng












1,000,000


18

Akron

OH

Water

CSO
Northside
Tunnel
(Design
Only)












4,600,000


20

Akron

OH

Water

CSO
Ohio
Canal
Tunnel
(Design
Only)










14,000,000


25

Akron

OH

Water

Water
Main
Replacement












5,000,000


35

Akron

OH

Water

Water
Storage
Clearwell










15,000,000


36

Brook
Park

OH

Streets/Roads












1,625,000


25

Brook
Park

OH

Water












1,300,000


15

Brook
Park

OH

Water

Heatherwood
Drive
Reconstruc3on
‐
remove
and
replace
exis3ng
pavement,
replace
exis3ng
water
main,
up‐ grade
exis3ng
storm
and
sanitary
sewers Ruple
Parkway
‐
Cedar
Point
Road
Water
Main
Replacement
‐replace
exis3ng
water
main
and
service
 connec3ons
on
Ruple
Parkway
and
Cedar
Point
Road Smith/Hummel
Sanitary
Sewer
‐
Phase
2
‐
install
54"
sanitary
sewer
on
Smith
Road
and
a
36"
sanitary
sewer
on
 Hummel
Road,
includes
modifica3ons
to
the
Fry
Road
Pump
Sta3on
and
the
storage
chamber
on
Smith
Road.












2,865,700


15

Canton

OH

CDBG

Mahoning
Road
Corridor
Development
project












8,000,000


150

Canton

OH

Energy

Green
Environmental
Solu3ons,
LLC












2,500,000


60

Canton

OH

Energy

American
Made
Fuel‐Biodiesel












3,700,000


75

Canton

OH

Public
Safety

Cook
Pharmica












8,000,000


135

Canton

OH

Water

WRF
Waste
Conversion
Process










32,500,000


30












2,000,000
 










3,775,000















100,000
 












350,000
 










1,100,000
 












600,000
 










1,942,000
 












300,000
 










1,500,000


City

State

Program

Cincinna3

OH

Airport

Lunken
Airport
Runway
and
Taxiway
sealcoat
and
paint

Project
Descrip3on

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

LED
Traffic
Lights
to
update
signals
and
conserve
energy.

$100,000.

Installed
in
EZ
or
other
low
mod
areas.

 One
half
FTE
construc3on
job
created. Blair
Ave.
tennis
courts.

$40,000.

In
EZ
neighborhood.

Short
term
construc3on
jobs.

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3 Cincinna3

OH OH

CDBG CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

CDBG

Cincinna3

OH

Energy

Cincinna3

OH

Energy

Create
an
environmental
volunteer
(Conserva3on
Corps)
program

Cincinna3

OH

Energy

Training
contractors
in
green
prac3ces

Cincinna3 Cincinna3 Cincinna3 Cincinna3 Cincinna3 Cincinna3 Cincinna3 Cincinna3 Cincinna3

OH OH OH OH OH OH OH OH OH

Energy Energy Energy Energy Energy Energy Streets/Roads Streets/Roads Streets/Roads

Climate
protec3on/energy
conserva3on
awareness
and
involvement
campaign High
Solar
Reflectance
Roofs.

Grants
for
high
SRIs Residen3al
Energy
Efficiency.

Funding
for
basic
energy
improvements
for
residences
 Forest
Carbon
Sequestra3on.

A
plan
that
covers
the
plan3ng
of
17,000
trees;
complete,
tree
plan3ng
in
 Recyclebank.

Incen3ve
program
that
s3mulates
increased
recycling Recycling
Carts.

Larger
carts
s3mulate
recycling
so
more
material
is
reprocessed Engineering,
Plan
Prepara3on
and
Construc3on
of
Interconnec3on
Cable
for
the
City’s
Computerized
Traffic
 Central
Riverfront
Street
Grid.

New
street
network
to
improve
local
access
between
Cincinna3’s
Central
 City
Street
Network
Rehabilita3on
Program

Cincinna3

OH

Transit

Cincinna3
Streetcar
Network

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

American
Red
Cross
Cincinna3
Headquarters
Building
Green
Infrastructure/Storm
Water
Control
‐
Installa3on
 of
green
storm
water
management
controls
on
a
new
building
including
3200
square
feet
of
sloped
green
roof,
 14,860
square
foot
bioinfiltra3on
syst Cincinna3
Public
Schools
–
Hartwell
Elementary
School
Green
Infrastructure/Storm
Water
Control
‐
Installa3on
 of
green
storm
water
management
controls
at
a
new
building
including

8200
square
feet
of
pervious
concrete
 in
parking
areas
and
bioinfiltra3on Cincinna3
Public
Schools
–
North
Avondale
Montessori
Green
Infrastructure/Storm
Water
Control
‐‐
 Installa3on
of
green
storm
water
management
controls
at
a
new
building
including
1200
square
foot
green
 roof
and
rain
barrels;
and
a
small
bioswale
with
und York
St.
&
Central
Ave.

Sewer
Replacement.

Shotcrete
repair
of
240
linear
feet
of
exis3ng
large
diameter
 sewer
that
is
in
disrepair. Cincinna3
Public
Schools
–
Tab
High
School
Green
Infrastructure/Storm
Water
Control
‐‐
Installa3on
of
green
 storm
water
management
controls
including
a
41,000
square
foot
green
roof
on
a
new
building Harwinton
Ln.
Sewer
Replacement.

This
is
a
WWIP
project
that
replaces
2,000
linear
feet
of
undersized
sewer
 that
is
disrepair. Hengehold
2nd
Pump
Sta3on
Elimina3on.

Eliminate
Hengehold
PS

and
construct
1,500
linear
feet
of
sewer.

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Laurel
&
Weaver
basketball
court.

$25,000.

In
HOPE
VI
Neighborhood
Revitaliza3on
Strategy
Area.

Short
term
 construc3on
jobs. Over‐the‐Rhine
Pool
renova3on.

$1,200,000.

In
EZ.

Eight
FTE
construc3on
jobs
created. Addi3onal
Street
Paving/Rehabilita3on
above
normal
City
levels.

$2,000,000.

Likely
in
EZ,
Neighborhood
 Revitaliza3on
Strategy
Areas,
or
other
low
income
neighborhoods.

Ten
FTE
construc3on
jobs
created. Liberty
Street
Traffic
and
Pedestrian
Improvements
in
the
Over‐the‐Rhine
low
income
neighborhood
are
 The
Warsaw
Avenue
Streetscape
project
is
Phase
II
of
a
streetscape
in
support
of
the
new
full
service
grocery
 store
in
East
Price
Hill,
a
low
income
neighborhood.

The
project
includes
new
street
realignment,
street
lights,
 trees,
sidewalks The
12th
&
Vine
Streetscape
in
the
Over‐the‐Rhine
low
income
neighborhood
will
be
a
con3nua3on
of
the
 Vine
street
Streetscape
and
will
fill
in
the
gaps
between
Vine
Street
and
previous
streetscapes
on
Jackson
 Street.

 MetroWest
Phase
II
project.

Total
costs
for
site
prepara3on
and
construc3on
of
a
60,000
square
foot
light
 industrial
building
would
be
approximately
$6.8
million
that
would
create
80‐100
FTE
permanent
jobs.

Project
 located
in
Lower
Price
Hill
neighbor Corryville
Public
Parking
structure.

Es3mated
cost
is
$4.5
million.

Project
enables
several
new
developments
 in
the
2600
block
of
Vine
Street.
The
an3cipated
developments
include
a
movie
theater,
bowling
alley
and
 family
style
sport
pub, New
Public
Street
for
Summit
Business
Park
in
the
Bond
Hill
neighborhood
which
is
a
low
mod
neighborhood.

 This
project
will
construct
a
new
street
(name
to
be
determined)
to
access
the
exis3ng
Summit
Behavioral
 Health
Facility Crosley
Building
project
renova3on
is
es3mated
at
$4,266,775.

A
minimum
of
300
FTE
jobs
are
an3cipated
to
 be
created
in
the
redeveloped
industrial
building.

Project
located
in
Camp
Washington
neighborhood,
a
low
 income
neighborhood. Dana
Avenue
Roadway
Improvements
in
the
Evanston
low
income
neighborhood

will
widen
and
improve
Dana
 Avenue
in
support
of
new
academic
buildings
at
Xavier
University
and
a
new
mixed
use
development
by
 Xavier/Corporex
called
Xavier
Square.

 Climate
Plan
Summit.

An
environmental/energy
conserva3on
Summit
focused
on
the
Business
and
 Ins3tu3onal
community


Mill
Creek
WWTP
Aera3on
Tanks
Diffusers
Replacement.

This
project
replaces
the
exis3ng
diffusers
in
the
 aera3on
tanks
at
the
mill
creek
WWTP
and
is
a
WPCLF
loan
fund
project. Placid
Meadows
Pump
Sta3on
Elimina3on.

Eliminate
Placid
Meadows
PS

and
construct
1,400
linear
feet
of
 sewer. SSO
568
&
569
Improvements
– Decrease
the
number
of
3mes
the
SSO
ac3vates.

This
project
replaces
4,200
linear
feet
of
pipe
that
is
 undersized
and
removes
two
SSO’s. Greater
Cincinna3
Water
Works
Roof
replacements,
including
"green
roofs" Lifle
Miami
WWTP
Primary
and
Secondary
Rota3ng
Trough
&
Gates
Replacement.

Replace
the
primary
and
 secondary
sefling
tanks,
inlet
gates,
and
scum
collec3on
trough
at
the
Lifle
Miami
wastewater
treatment
 plant. Lifle
Miami
WWTP
Primary
and
Secondary
Tank
Rechaining.

Replace
the
primary
and
secondary
rechaining
at
 Lifle
Miami
wastewater
treatment
plant.

Funding
Required 










1,200,000


Jobs 30














100,000


0.5
















40,000


1
















25,000


1












1,200,000


8












2,000,000
 










1,000,000


10 35














600,000


37












1,145,000


53












6,800,000


100












4,500,000


120












1,000,000


200












4,266,775


300












1,500,000


480
















50,000


1














100,000


1














100,000
 












100,000
 












100,000
 










1,500,000
 










2,460,000
 










2,600,000
 










8,102,645
 










3,500,000
 










8,000,000


1 2 3 7 25 60 143 30 112










60,000,000


900








132,000,000


150














299,600


3














107,500


3
















34,000


3














319,000


3














655,800


7














836,000


7














551,000


7












3,900,000


7














600,000


7












1,800,000


7












1,195,000


8.8












6,171,000


10










14,000,000


10

City

State

Program

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Water

Foley
Forest
Pump
Sta3on
Upgrade,
Dellwood
Estates
&
North
Bay
Village
Pump
Sta3on
Elimina3ons
Ph.
2.

 Consolidates
three
old
pump
sta3ons
into
one
new
pump
sta3on
and
construct
1,000
linear
feet
of
gravity
 sewer
and
1,200
linear
feet
of
force
main. Winton
1
&
2
and
Sherwood
Pump
Sta3on
Consolida3on.

Consolidates
three
old
pump
sta3ons
into
one
new
 pump
sta3on
and
construct
4,000
linear
feet
of
gravity
sewer
and
6,000
linear
feet
of
force
main. Greater
Cincinna3
Water
Works
Backup
power
&
system
storage

Project
Descrip3on

Cincinna3

OH

Water

Cincinna3

OH

Water

Cincinna3

OH

Cincinna3

Funding
Required












1,300,000


Jobs

11












2,899,000


11












8,056,000


59.6

Central
Riverfront
Park/bank
stabiliza3on/flood
control










10,000,000


74










15,444,000
 114.3

Water

Greater
Cincinna3
Water
Works
Miller
Plant
Capacity
and
Treatment
Enhancement.

This
project
would
fund
 ultraviolet
disinfec3on
system
powered
partly
by
solar
power
as
well
as
other
play
capacity
improvements. Greater
Cincinna3
Water
Works
System
enhancements
and
expansion

OH

Water

East
End/Lunken
Levee
Rebuilding
Project










35,000,000


Cincinna3

OH

Water

Greater
Cincinna3
Water
Works

Asset
Management
and
infrastructure
replacement










67,183,000
 497.2

Columbus

OH

Airport

NetJets
Apron
Expansion
and
Taxiway
at
Port
Columbus












4,400,000


Columbus

OH

Energy

Central
Safety
Building
and
City
Hall
energy
efficiencies












6,900,000


Columbus

OH

Energy

CNG
Fueling
Sta3ons
and
CNG
Refuse
Trucks












8,500,000


Columbus

OH

Energy

Old
Police
Building
Renova3ons
and
Park










26,000,000


Columbus

OH

Streets/Roads

Alum
Creek
Bikeway
Trail












3,000,000


Columbus

OH

Streets/Roads

John
Glenn
Avenue
Reconstruc3on












5,200,000


Columbus

OH

Streets/Roads

Town
Street
Bridge
Demoli3on/Rich
Street
Bridge
construc3on










10,000,000


Columbus

OH

Streets/Roads

West
Bank
Park/Greenway
Connector












2,000,000


Columbus

OH

Streets/Roads

Downtown/River
South
Road
and
park
improvments










20,000,000


2000

Columbus

OH

Streets/Roads

Emerald
Parkway/Sterling
Commerce
improvements












1,000,000


2000

Columbus

OH

Streets/Roads

Na3onwide
Children's
Hospital
infrastructure
improvements










25,000,000


2500

Columbus

OH

Transit

North
Corridor
Light
Rail
System








200,000,000
 11000

Columbus

OH

Water

5th
Avenue
Dam
removal












2,500,000


Columbus

OH

Water

Lockbourne/Rickenbacker
Subtrunk










20,000,000


Dayton

OH

Airport

Dayton

OH

Airport

Dayton

OH

Airport

Dayton
Wright
Brothers
T‐Hangar
Project.
This
project
calls
for
the
demoli3on
of
exis3ng
aged
T‐Hangars
and
 the
construc3on
and
development
of
new
hangars
to
support
general
avia3on
demands. Dayton
Interna3onal
Airport
Facility
Revitaliza3on
Project
‐
rehabilita3on
and
renova3on
of
old
US
Airways
 reserva3on
call
center.
It
would
create
between
200‐300
full‐3me
permanent
posi3ons
within
a
2‐4
year
 period. Dayton
Interna3onal
Airport
Hangar
Project
‐
construc3on
and
development
of
40,000
sq.
b.
spec
hangar

Dayton

OH

Airport

Dayton

OH

Airport

Dayton

OH

CDBG

Dayton

OH

CDBG

Dayton

OH

CDBG

Renova3on
of
Bomberger
Pool
which
was
built
in
1956.
Includes:
1)
Filling
the
diving
well,
reinforcing
the
 perimeter
walls
with
shot
Crete
2)
Replacing
the
concrete
pool
deck
3)
Upgrading
or
installing
new
pumps,
 piping
and
filtra3on
system
4)
Remodel
t Youth
Employment
funding
to
support
summer
youth
employment
program
for
up
to
200
young
people
in
 Northwest
Dayton Miracle
Lane:
Construct
new
road
and
infrastructure
for
Miracle
Lane
redevelopment

Dayton

OH

CDBG

Demoli3on
&
Cleanup
at
northwest
corner
of
Webster
St.
&
Monument
Ave.

Dayton

OH

CDBG

Expansion
&
Renova3on
of
Northwest
Recrea3on
Center

Dayton

OH

CDBG

Dayton

OH

CDBG

Dayton

OH

CDBG

IDCAST
Renova3on:
Rehabilitate
a
25,000
SF
warehouse
into
a
technology
laboratory
for
advanced
sensor
 research.
The
project
would
create
an
addi3onal
53
technology
jobs
aber
comple3on. The
Phoenix
Project:
Fairview
Commons:
Infrastructure
improvements
for
a
new
LEED‐cer3fied
civic
space.
The
 Fairview
Commons
is
the
centerpiece
of
a
neighborhood
revitaliza3on
strategy
supported
by
Good
Samaritan
 Hospital,
which
is
an
adjacent
employer. New
and
expanded
parks
and
green
spaces
resul3ng
from
demoli3on
of
nuisance
housing

Dayton

OH

CDBG

Dayton

OH

CDBG

Dayton

OH

CDBG

Dayton

OH

CDBG

Dayton

OH

Dayton

LUDOP:
The
project
will
create
a
Land
Use
Development
Site
that
will
afract
new
businesses
to
the
airport
and
 surrounding
communi3es,
s3mulate
the
job
market,
increase
non‐airline
revenues,
and
improve
the
aesthe3cs
 around
the
Day3n
Interna3onal
Air Create
an
inter‐modal
hub
at
the
airport
using
rail,
air,
and
truck
distribu3on

Revitalize
an
older
arts
district
by
making
infrastructure
improvements
to
increase
pedestrian
access
and
 connec3vity
to
adjacent
areas Expand
a
program
to
provide
job
training
and
documented
work
experience
for
hard
to
reach
popula3ons
on
 infrastructure
projects Restore
Historic
Structure
associated
with
Wright
Brothers










20,576,083
 152.3












3,000,000


200 2800

25














500,000


50












6,500,000


125










10,600,000


152










10,000,000


353














350,000


5














350,000


5














500,000


13














110,000


16












1,500,000


22














700,000


26












1,800,000


26












3,000,000


43












3,000,000


43














500,000


50












3,500,000


50












3,750,000


54

CDBG

Tech
Town
Central
Park:
Construct
a
4‐acre
park
on
the
Tech
Town
Campus
designed
to
provide
open
space
for
 a
30
acre
business
park Miracle
Lane:
Develop/construct
mixed
use
anchor
development
at
Miracle
Lane
site












4,500,000


65

OH

CDBG

Delphi
(Home
Ave.)
Redevelopment












5,000,000


72

Dayton

OH

CDBG












5,000,000


72

Dayton

OH

CDBG












5,000,000


125

Dayton

OH

CDBG

Technology
Union
Building:
Construct
a
65,000
SF
technology
building
on
the
Tech
Town
Campus.
The
 Technology
Union
is
designed
to
promote
commercializa3on
of
emerging
technologies
by
housing
research
 facili3es
adjacent
to
the
private
sector,
profit
mo3 Dayton
Interna3onal
Airport
Alterna3ve
Energy
Resource
Project:

The
project
will
consist
of
the
evalua3on,
 selec3on
and
implementa3on
of

proposed
alterna3ve
energy
sources
that
will
help
the
Airport
and
Airport
 Tenants
reduce
their
reliance
on
tra Reposi3on
vintage
office
buildings
to
retrofit
space
to
accommodate
mixed
use
development










10,000,000


144

Dayton

OH

CDBG










13,000,000


187

Dayton

OH

CDBG












9,000,000


318

Dayton

OH

Energy

Dayton

OH

Energy

Construct
citywide
public
recrea3on
complex
that
is
"region‐class,"
that
is
compe3ve
with
recrea3on
facili3es
 in
the
City's
suburbs.

This
would
be
the
first
new
public
recrea3on
complex
built
by
the
City
of
Dayton
in
over
 30
years. Infrastructure
improvements
for
redevelopment
adjacent
to
the
Central
Business
District
leveraging
our
 riverfront
and
downtown
cultural
ameni3es
to
provide
unique
loca3ons
for
commercial
development. Miracle
Lane:
Incorporate
Geothermal
and/or
solar/alterna3ve
energy
into
anchor
development
building
 design Hot
Water
Piping
Replacement
Project
at
Wastewater
Treatment
Plant

Dayton

OH

Energy

Bio‐mass
infrastructure
for
Ofawa
Yards:
hea3ng
system
using
vegeta3on
for
fuel














300,000


6














690,000


10












1,500,000


22

City

State

Program

Dayton

OH

Energy

Dayton

OH

Dayton

Project
Descrip3on

Funding
Required

Jobs












2,500,000


36

Energy

Development
of
Deconstruc3on
and
Construc3on
Waste
Recycling
Centers
to
reduce
the
amount
of
waste
 3pped
into
landfills
and
to
provide
low
cost
recycled
products
to
the
community. Energy
retrofits
of
public
buildings
as
has
been
iden3fied
in
our
Honeywell
proposal.












3,200,000


46

OH

Energy

Automa3c
Meter
Reading
Implementa3on












8,000,000


50

Dayton

OH

Energy












3,500,000


50

Dayton

OH

Energy

Tech
Town
Solar
Farm
for
Geothermal
Hea3ng:
Construc3ng
a
4‐acre
solar
farm
designed
to
provide
electricity
 to
power
geothermal
pumps
to
heat
&
cool
3
new
buildings
in
Tech
Town.
Approximately
556
post‐construc3on
 posi3ons
will
be
created
through
this Street
Maintenance
LEED
cer3fied
facility












3,700,000


53

Dayton

OH

Energy












5,000,000


125

Dayton

OH

Public
Safety

Dayton
Interna3onal
Airport
Alterna3ve
Energy
Resource
Project:
The
project
will
consist
of
the
evalua3on,
 selec3on,
&
implementa3on
of
proposed
alterna3ve
energy
sources
that
will
help
the
Airport
&
Airport
 Tenants
reduce
their
reliance
on
tradi3onal
sources Automated
License
Plate
Readers

Dayton

OH

Public
Safety

Fiber
Op3cs
to
Districts

Dayton

OH

Public
Safety

Dayton

OH

Public
Safety

Dayton

OH

Public
Safety

Ini3a3ve
to
Reduce
Pros3tu3on‐Off
the
Streets
Program.
This
ini3a3ve
would
connect
individuals
involved
in
 pros3tu3on
with
resources
to
leave
a
life
of
pros3tu3on.

Beginning
with
emergency
shelter
and
con3nuing
 with
an
array
of
educa3onal Problem
Oriented
Policing.

The
Dayton
Police
Department
is
integra3ng
Problem
Oriented
Policing
(POP)
into
 the
way
law
enforcement
provides
services
to
the
community.

U3lizing
the
SARA
model
(Scanning,
Analyzing,
 Responding,
Assessing)
as
the
method
f Digital
Video
for
Marked
Cruisers

Dayton

OH

Public
Safety

Dayton

OH

Dayton
















85,000
 














15,000













1,500,000


0














750,000


0














450,000


1














750,000


10

Streets/Roads

Community
Ini3a3ve
to
Reduce
Gun
Violence.
The
Community
Ini3a3ve
to
Reduce
Gun
Violence
program
is
a
 mul3‐jurisdic3onal
and
mul3‐agency
mutual
effort
to
quickly
and
effec3vely
reduce
gun‐violence
and
 associated
homicides.

 Goodlow
Culvert
Replacement
















40,000


1

OH

Streets/Roads

Brown
Street
Transporta3on
Enhancement
















70,000


2

Dayton

OH

Streets/Roads

North
Main
Street
widening
at
Helena
and
at
Fairview














180,000


6

Dayton

OH

Streets/Roads

Old
North
Dayton
Enhancement














170,000


6

Dayton

OH

Streets/Roads

Heid
Avenue
Widening














275,000


10

Dayton

OH

Streets/Roads

Stewart
Street
Reconstruc3on,
Phase
1
(Main
to
paferson)















300,000


11

Dayton

OH

Streets/Roads

US‐35
Underpass
ligh3ng
improvements














325,000


11

Dayton

OH

Streets/Roads

Downtown
Two‐way
street
Conversion














350,000


12

Dayton

OH

Streets/Roads

Germantown
Street
Transporta3on
Enhancement














350,000


12

Dayton

OH

Streets/Roads

Steve
Whalen
Boulevard
Bike
Path














350,000


12

Dayton

OH

Streets/Roads

Stewart
Street
Reconstruc3on,
Phase
2
(Main
to
Brown)














340,000


12

Dayton

OH

Streets/Roads

Wayne
Avenue
Transporta3on
Enhancement














350,000


12

Dayton

OH

Streets/Roads

Keowee
Street
reconstruc3on














400,000


14

Dayton

OH

Streets/Roads

Wright
Dunbar
Transporta3on
Enhancements














400,000


15

Dayton

OH

Streets/Roads

Alley
Chip
Seal
Citywide














500,000


18

Dayton

OH

Streets/Roads

Bridge
Street
Bridge
Replacement














500,000


18

Dayton

OH

Streets/Roads

Miracle
Lane:
Construct
new
road
and
infrastructure
for
redevelopment














500,000


18

Dayton

OH

Streets/Roads

Rosedale
Drive
Bridge
Replacement














500,000


18

Dayton

OH

Streets/Roads

Hoover
Avenue
Culvert
Replacement














700,000


25

Dayton

OH

Streets/Roads

Wright
Dunbar
Traffic
Calming
and
Sidewalk
improvements














750,000


26

Dayton

OH

Streets/Roads

Concrete
Bus
Pads












1,000,000


35

Dayton

OH

Streets/Roads

Helena
St.
Gateway












1,000,000


35

Dayton

OH

Streets/Roads

Main
Street
Bus
Lanes












1,000,000


35

Dayton

OH

Streets/Roads

Rehabilitate
and
repair
2
railroad
bridges
owned
by
the
City
of
Dayton
and
make
safety
enhancements












1,000,000


35

Dayton

OH

Streets/Roads

Residen3al
Slurry
Seal
Citywide












1,000,000


35

Dayton

OH

Streets/Roads

Webster
St.
Widening












1,000,000


35

Dayton

OH

Streets/Roads

Downtown
Curb
&
Sidewalk
Replacement












1,300,000


46

Dayton

OH

Streets/Roads

Great
Miami
Boulevard
Extension












1,500,000


53

Dayton

OH

Streets/Roads

Traffic
Signal
Rebuilds,
PHases
7‐9












1,940,000


68

Dayton

OH

Streets/Roads

Wheelchair
ramps












2,000,000


70

Dayton

OH

Streets/Roads












5,000,000


72

Dayton

OH

Streets/Roads

Renewing
the
Urban
Forest‐
Storms
and
3me
have
taken
their
toll
on
the
city’s
street
trees,
which
reduce
the
 urban
heat
island
effect
and
increase
neighborhood
property
values.
Funds
would
be
used
to
trim
and
remove
 damaged
trees
and
plant
new
trees
alon Broadway
Bridge
over
Wolf
Creek












4,000,000


141

Dayton

OH

Streets/Roads

Commercial
Corridor
Infrastructure
Revitaliza3on‐
streets,
sidewalks,
trees,
bury
overhead
u3li3es












8,000,000


282

Dayton

OH

Streets/Roads

Asphalt
Resurfacing
for
thoroughfares
and
residen3al
streets










19,000,000


670

Dayton

OH

Transit












1,250,000


30

Dayton

OH

Transit

Dayton
Interna3onal
Airport
Baggage
Screening
and
Security
Checkpoint
Reconfigura3on
Project
will
upgrade
 the
Airport
Lobby
and
make
it
more
secure
for
the
TSA
Explosive
detec3on
equipment
and
reconfigure
the
 security
checkpoint
area
for
more
efficienc Tech
Town
Transporta3on
Center














925,000


40

Dayton

OH

Transit

Create
Logis3cs
&
Distribu3on
hub
near
US‐35/I‐75
interchange












7,500,000


108

Dayton

OH

Transit

create
an
inter‐modal
hub
serving
truck
and
rail
for
distribu3on










12,000,000


172

Dayton

OH

Water

Lucille
Storm
Sta3on
flapgate
Replacement
















90,000


3

Dayton

OH

Water














420,000


6

Dayton

OH

Water

Elevated
Water
Storage
Tank
Pain3ng‐
Clean
and
recoated
interior
and
exterior
of
Burkhardt
Tank,
to
maintain
 serviceability
of
potable
water
tank Cleveland
Park
Sanitary
Sewer
Improvement














200,000


7

Dayton

OH

Water

Environmentally
Friendly
Golf
Courses














500,000


7

Dayton

OH

Water

Haverfield
Rd.
Sanitary
Sewer
Improvement














186,000


7

Dayton

OH

Water

Fauver
Ave.
Sanitary
Sewer
Improvement














250,000


9

City

State

Program

Dayton

OH

Water

Dayton

OH

Water

Miami
Valley
Hospital
Sanitary
Sewer
Upgrade
–
Install
a
new
sanitary
sewer
main
in
Wyoming
St.
to
handle
 increase
sewer
flows
from
the
hospital. Harvard
Blvd.
Storm
Sewer
Improvement

Project
Descrip3on

Dayton

OH

Water

Dayton

OH

Water

Dayton

OH

Dayton

Funding
Required

Jobs














250,000


9














300,000


11

Mapping
a
Fix
to
Carbon
Emissions
Reduc3ons












5,000,000


15












5,000,000


15

Water

Odor
Control
Measures
‐
Sealing
the
grit
and
primary
basins
with
bio‐filter
covers
to
eliminate
odors
from
 coming
from
the
basins. RecycleBank
Ini3a3ve
Program












2,000,000


15

OH

Water

Nicholas
Road
Water
Main
Replacement














539,000


19

Dayton

OH

Water

Installa3on
of
a
storm
water
system
in
the
Source
Water
Protec3on
Area












1,500,000


53

Dayton

OH

Water












1,500,000


53

Dayton

OH

Water

Ofawa
Water
Treatment
Plant
–
replace
filter
media,
surface
wash
piping
and
ancillary
components
that
has
 reached
its
service
life.
 Upgrade
water
infrastructure
to
the
Tech
Town
area,
which
is
a
Brownfield
undergoing
rehabilita3on












1,500,000


53

Dayton

OH

Water












2,000,000


71

Euclid

OH

CDBG

Replacement
of
obsolete
and
old
water
lines,
sanitary
sewer
lines,
and
storm
sewer
lines
in
Monument
Avenue
 &
Webster
Streets Euclid
Dog
Pound
Roof
Replacement
















70,000


7

Euclid

OH

CDBG

Euclid
Fire
Sta3on
3
Renova3ons
(kitchen
&
parking
improvements)
















70,000


7

Euclid

OH

CDBG

Euclid
City
Hall
Roof
Replacement














385,000


10

Euclid

OH

CDBG

Euclid
Fire
Sta3on
1
Dorm
Renova3ons














100,000


10

Euclid

OH

CDBG

Euclid
North
Street
Annex
Capital
Improvements
















70,000


10

Euclid

OH

CDBG

Euclid
Old
City
Hall
Improvements
‐
Exterior
Tuckpoint
&
ADA















120,000


10

Euclid

OH

CDBG

Euclid
Parks
and
Recrea3on
Department
Maintenance
Building
Rehab
‐
Roof
and
Windows














100,000


10

Euclid

OH

CDBG

Euclid
Railroad
Rail
to
Trail
Project














600,000


10

Euclid

OH

CDBG

Euclid
Sims
Park
Outdoor
Amphitheater
Improvements














400,000


10

Euclid

OH

CDBG

Euclid
Citywide
Bicycle
Plan














750,000


15

Euclid

OH

CDBG

Euclid
Streets
Department
Roof

&
Window
Replacement














211,000


15

Euclid

OH

CDBG

Euclid
Citywide
WiFi
Project












1,800,000


20

Euclid

OH

CDBG

Euclid
Memorial
Park
Master
Plan
Capital
Improvements












3,000,000


30

Euclid

OH

CDBG

Construc3on
of
Euclid
Public
Safety
Center










11,200,000


70

Euclid

OH

CDBG

Euclid
Recrea3on
Center












9,000,000


90

Euclid

OH

CDBG

Euclid
Shore
Cultural
Center
Rehabilita3on
‐
Capital
Improvements












9,000,000


90

Euclid

OH

Energy

Euclid
Joint
City/Library
Solar
Demonstra3on
Project














475,000


10

Euclid

OH

Energy

Euclid
Joint
City/Library
Wind
Turbine
Demonstra3on
Project














600,000


10

Euclid

OH

Schools










67,000,000


804

Euclid

OH

Streets/Roads

Euclid
City
Schools
Master
Plan
Implementa3on
‐
Phase
I
‐
New
Elementary
School
&
Football
 Stadium/Complex East
204
Street/
Dille
Roadway
Project














950,000


9

Euclid

OH

Streets/Roads

East
264
Street
Roadway
Project












1,172,000


11

Euclid

OH

Streets/Roads

East
214
Street
Roadway
Project












1,600,000


16

Euclid

OH

Streets/Roads














824,300


20

Euclid

OH

Streets/Roads

Downtown
Euclid
Phase
II
‐
Shore
Center
Drive,
Farringdon
Avenue,
East
228
Street,
Babbif
Road,
E222
Street
 Roadway/Streetscape
Improvements St.
Clair
Resurfacing/Hydrant
Replacement
Project












2,012,500


20

Euclid

OH

Streets/Roads

East
248
Street/Shorview
Roadway
Project












2,146,800


21

Euclid

OH

Streets/Roads

East
222
Steet
Roadway
Project
‐
Phase
II












2,520,700


25

Euclid

OH

Streets/Roads

Bruce
and
Crystal
Roadway
Project












2,732,000


27

Euclid

OH

Streets/Roads

East
266
Street
Roadway
Project












2,720,000


27

Euclid

OH

Streets/Roads

Citywide
Sidewalk
Replacement
Program










15,000,000


30

Euclid

OH

Streets/Roads

East
191
‐
East
195
Roadway
Project












3,132,000


31

Euclid

OH

Streets/Roads












1,736,510


35

Euclid

OH

Streets/Roads

Euclid

OH

Streets/Roads

Downtown
Euclid
Phase
III
‐
Interior
Municipal
Parking
Lot
Roadway/Streetscape
Improvements;
East
228
 Extension Downtown
Euclid
Phase
I
‐
Lake
Shore
Boulevard,
Shore
Center
Drive
Extension,
Babbif/E222
Intersec3on
 Roadway/Streetscape
Improvements Citywide
Street
Resurfacing
including
curb
replacement

Euclid

OH

Transit

Downtown
Euclid
Bliss
Lane
Bus
Turnaround

Euclid

OH

Water

Euclid
Memorial
Park
Waterline












1,500,000


15

Euclid

OH

Water

Combined
Sewer
Overflow
Elimina3on
Program
Projects










34,000,000


340

Lakewood

OH

CDBG

Madison
Park
Improvements












1,000,000


13

Lakewood

OH

CDBG

City
Parking
Lots












1,000,000


15

Lakewood

OH

CDBG

CDBG
Street
Repair
Program












2,000,000


18

Lakewood

OH

CDBG

Lake
Erie
Recrea3onal
Pier












2,000,000


20

Lakewood

OH

CDBG

Shoreline
Protec3on
and
Enhancement












1,250,000


25

Lakewood

OH

CDBG

Downtown
Parking
Deck












3,000,000


145

Lakewood

OH

Streets/Roads

W.
117th
St.
Curb
Repair
















75,000


10

Lakewood

OH

Streets/Roads

Sidewalk
Replacement












2,000,000


14

Lakewood

OH

Streets/Roads

Traffic
Signal
Upgrade














750,000


15

Lakewood

OH

Streets/Roads

Bunts
Rd.
Repair












1,000,000


18

Lakewood

OH

Streets/Roads

Street
Repair
Program










10,000,000


30

Lakewood

OH

Water

Interceptor
Sewer
Cleaning
and
Inspec3on












3,000,000


13

Lakewood

OH

Water

WWTP
Class
"A"
Sludge
Project












1,500,000


13

Lakewood

OH

Water

Manhole
Separa3on
Project












5,000,000


15

Lakewood

OH

Water

Watermain
Replacement
Program












2,500,000


18

Lakewood

OH

Water

Downspout
Separa3on
Program










15,000,000


25

Lima

OH

CDBG

Trees














500,000


20

Lima

OH

CDBG

Municipal
Center
accessibility
&
security
improvements












1,000,000


25












8,613,070


86










23,000,000


230














360,510


12

City

State

Program

Lima

OH

CDBG

Bellefontaine
Park

Project
Descrip3on

Funding
Required 










2,000,000


Jobs 30

Lima

OH

CDBG

Lima

OH

CDBG

Industrial
Park
Roads












2,500,000


30

Park
Improvements












2,000,000


Lima

OH

30

CDBG

Riverwalk
landscaping












1,500,000


Lima

30

OH

CDBG

City
Parking
lot
improvements
with
storm
water
catchments
and
with
metered
spaces
for
electric
hybrids












3,000,000


40

Lima

OH

CDBG

Riverwalk
Connectors












1,900,000


40

Lima

OH

CDBG

Bellefontaine
Corridor












3,200,000


50

Lima

OH

CDBG

Demoli3on












3,000,000


50

Lima

OH

CDBG

Facade
improvements
on
Corridors












2,000,000


50

Lima

OH

CDBG

Lima
Public
Library
renova3ons












2,000,000


50

Lima

OH

CDBG

Lima
Trust
Historic
Renova3on












2,000,000


50

Lima

OH

CDBG

S.
Main
Street
Corridor
improvements












3,200,000


50

Lima

OH

CDBG

Sidewalks












2,000,000


50

Lima

OH

CDBG

S3ppich
Building
Historic
Renova3on












2,000,000


50

Lima

OH

CDBG

Allen
County
Museum
HVAC,
Electrical
and
systems
updates












3,000,000


75

Lima

OH

CDBG

Southside
Grade
Separa3on










11,000,000


80

Lima

OH

CDBG

Agile
Manufacturing
Ini3a3ve










10,000,000


100

Lima

OH

CDBG

CBD
Renewal












5,000,000


100

Lima

OH

CDBG

Eastside
Grade
Separa3on










16,000,000


100

Lima

OH

CDBG

Hall
of
Jus3ce
renova3ons










10,500,000


100

Lima

OH

CDBG

Lima
Stadium












8,000,000


150

Lima

OH

CDBG

IGCC
Loan
Package










50,000,000


500

Lima

OH

Energy

Fire
sta3ons
energy
retrofits














500,000


10

Lima

OH

Energy

City
Building
Retrofits












1,500,000


30

Lima

OH

Energy

LED
Streetligh3ng












3,000,000


30

Lima

OH

Energy

Solar
Panels
for
Roobops












2,000,000


30

Lima

OH

Energy

Steam
line
for
energy












3,000,000


30

Lima

OH

Energy

Energy
Retrofits












3,000,000


40

Lima

OH

Energy

Methane
capture/pipeline












3,000,000


40

Lima

OH

Energy

Electric
U3lity/distribu3on












4,000,000


50

Lima

OH

Energy

Reservoir
Windmills












5,000,000


50

Lima

OH

Energy

Synthe3c
Gas
Research










10,000,000


100

Lima

OH

Energy

Hybrid
Vehical
Purchase












5,000,000


200

Lima

OH

Energy

Residen3al
energy
upgrades












5,000,000


200

Lima

OH

Energy

Commercial
energy
upgrades










10,000,000


400

Lima

OH

Housing

Energy
Upgrades












4,000,000


100

Lima

OH

Public
Safety

Crime
Preven3on














500,000


10

Lima

OH

Public
Safety

Technology,
e.g.,
radios,
cruiser
laptops,
etc.












1,000,000


10

Lima

OH

Public
Safety

COPs












2,000,000


25

Lima

OH

Schools

Energy
Upgrades












5,000,000


100

Lima

OH

Streets/Roads

Comprehensive
Bike
Route












7,500,000


50

Lima

OH

Streets/Roads

Sugar
St.
Connector












6,500,000


60

Lima

OH

Streets/Roads

Arterial
Upgrades












5,000,000


75

Lima

OH

Streets/Roads

Bridge
Restora3on










10,500,000


80

Lima

OH

Streets/Roads

Rail
to
IGCC
site










15,000,000


100

Lima

OH

Streets/Roads

General
Resurfacing












5,000,000


150

Lima

OH

Transit

RTA
Rolling
Stock












2,000,000


15

Lima

OH

Transit

School
Buses












2,000,000


15

Lima

OH

Transit

EIS
for
High
Speed
Rail
Line












2,200,000


30

Lima

OH

Transit

RTA
buildings,
shelters
&
facili3es












2,000,000


30

Lima

OH

Water

South
end
Water
tower












4,000,000


25

Lima

OH

Water

Charcoal
Filters












5,000,000


50

Lima

OH

Water

Waterline
Renewals










10,000,000


50

Lima

OH

Water

CSO/SSO
Projects










10,000,000


100

Lima

OH

Water

Stormwater
Renova3ons










10,000,000


100

Lima

OH

Water

Upground
Reservoir










25,000,000


100

Lima

OH

Water

Wastewater
Treatment
Plant
replacements
and
improvements










30,000,000


200

Lorain

OH

CDBG












3,000,000


20

Lorain

OH

Energy

Streetscape
renova3on
and
building
facade
improvements
in
shopping
district.

Streetligh3ng
improvements,
 pedestrian
walkways,
police
crime
deterent
cameras
and
beau3fica3on
of
streetscape
through
plan3ngs.

 Includes
replacement
of
18"
water
line. Wind
monitoring
sta3on
for
data
collec3on
for
installa3on
of
wind
turbines
on
land
and
water
based
turbines.














100,000


5

Lorain

OH

Energy

Install
generators
on
city
land
fill
to
use
methane
for
power
genera3on.












1,000,000


10

Lorain

OH

Energy

Install
wind
turbines
on
shoreline
to
power
municipal
power
needs










25,000,000


150

Lorain

OH

Public
Safety

Neighborhood
surveilance
cameras
installed
in
crime
and
drug
problem
areas.














250,000


1

Lorain

OH

Public
Safety

Vehicle
GPS
system
for
all
police
vehicles.














300,000


1

Lorain

OH

Public
Safety

dash
cameras
for
80
police
units.














500,000


2

Lorain

OH

Public
Safety

License
regogni3on
camera
equipement.

10
vehicles
.














250,000


2

Lorain

OH

Public
Safety

re‐establish
gang
task
force
unit
with
the
hiring
of
5
police
officers.














800,000


5

Lorain

OH

Public
Safety

Re‐
establish
street
crimes
unit.

Includes
hiring
of
10
officers
and
equipement.












2,000,000


10

Lorain

OH

Streets/Roads

Mar3n's
Run
water
way
improvements
‐
Channel
deepening,
widening
and
banking
improvements.

Including
 reten3on
pond.












3,500,000


20

City

State

Program

Lorain

OH

Streets/Roads

Cooper
Foster
Park
Road
widening
and
bridge
improvement
project.

Project
Descrip3on

Funding
Required 










4,800,000


Jobs 25

Lorain

OH

Streets/Roads

Lorain

OH

Streets/Roads

Jaeger
Road
improvemnt
project.

Road
widening,
storm
drainage,
bike
paths.












5,500,000


25

Kolbe
Rd
reconstruc3on
consis3ng
of
road
improvements,
bike
lanes,
storm
improvements.












1,500,000


Lorain

OH

30

Transit

Port
reconstruc3on
to
accomadate
a
bulk
and
break
bulk
shipping
port
including
rain
access
improvements.










15,000,000


Lorain

45

OH

Water

Hamilton
water
line
replacement
‐
approx
1
mile
of
16"
line.












1,500,000


15

Lorain

OH

Water

Inner
city
waterline
replacement
program.












3,000,000


15

Lorain

OH

Water

1
million
gallon
water
tower
construc3on
for
capacity.












3,000,000


20

Lorain

OH

Water

Dunton
Rd.
Waterline
‐
main
line
from
reservoir
and
water
tower.












1,000,000


20

Lorain

OH

Water

Construc3on
of
storage/conveance
tunnel
to
complete
findings
and
orders
for
SSO
program.










30,000,000


40

Lorain

OH

Water








250,000,000


300

Marion

OH

Airport

Regional
Waste
Water
Treatment
Plant.

Constructed
on
former
Brownfield
site
this
would
be
a
regional
facility
 elimina3ng
mul3ple
discharge
permits.

Discharge
from
new
facility
would
be
u3lized
by
steel
making
 opera3ons
for
cooling
water
or
discharge Airport
terminal
building












2,500,000


50

Marion

OH

CDBG

Mt
Vernon
Avenue
storm
relief
pipe














500,000


5

Marion

OH

CDBG

Airport
ditch
enclosure












1,500,000


8

Marion

OH

CDBG

Bellefon3ane
Avenue
Ditch
enclosure












2,500,000


10

Marion

OH

CDBG

Columbia
Ditch
Enclosure












3,000,000


10

Marion

OH

CDBG

Fairpark
Ditch
enclosure












2,000,000


10

Marion

OH

CDBG

Generator
replacement‐city
hall
&
rec
center














200,000


10

Marion

OH

CDBG

QuQua
Ditch
enclosure












2,500,000


10

Marion

OH

CDBG

Blaine/Columbia
storm
relief
pipe












4,000,000


15

Marion

OH

CDBG

Senior
Center
complex
improvements












1,500,000


20

Marion

OH

CDBG

Recrea3on
storage
building














500,000


30

Marion

OH

CDBG

Bike
path
loop‐CBD
to
rec
centers












3,500,000


40

Marion

OH

CDBG

Replacement
swimming
pool












3,000,000


50

Marion

OH

Energy

Replacement
roof
on
city
hall














100,000


8

Marion

OH

Energy

Solar
Panels
for
city
buildings












2,000,000


30

Marion

OH

Public
Safety

Pumper
truck
replacement
for
fire
service














350,000


2

Marion

OH

Public
Safety

Security
cameras
in
CBD












1,000,000


3

Marion

OH

Public
Safety

Replacement
roof/aprons
at
fire
sta3ons














300,000


6

Marion

OH

Public
Safety

Replacement
fire
sta3on
for
S.
Prospect












3,500,000


50

Marion

OH

Streets/Roads

Rehab
of
CDB
parking
lots














750,000


10

Marion

OH

Streets/Roads

Forest
Street
replacement












2,000,000


12

Marion

OH

Streets/Roads

Fairpark
addi3onal
street
replacement












3,200,000


15

Marion

OH

Streets/Roads

Silver
Street
reconstruc3on












5,000,000


20

Marion

OH

Streets/Roads

State/Prospect
service
road
reconstruc3on












1,750,000


20

Marion

OH

Streets/Roads

Kenton
Avenue
grade
separa3on










10,000,000


40

Marion

OH

Streets/Roads

Bellefontaine
Avenue
reconstruc3on












7,000,000


60

Marion

OH

Streets/Roads

Delaware
Avenue
reconstruc3on












7,000,000


60

Marion

OH

Streets/Roads

Center/Church
Streets
realignment










10,000,000


75

Marion

OH

Streets/Roads

State/Propect
Streets
realignment










10,000,000


75

Marion

OH

Streets/Roads

NE
&
SW
legs
of
city
outerbelt










20,000,000


100

Marion

OH

Streets/Roads

Northwest
Industrial
Connector










16,000,000


150

Marion

OH

Transit

Transit
terminal
building
replacement














300,000


15

Marion

OH

Water

1,100'
W.
Center
sewer
lining,
Ph
1












2,200,000


10

Marion

OH

Water

1,300'
Normandy/Virginia
sewer
replacement












2,600,000


10

Marion

OH

Water

2,300'
W.
Center
sewer
lining,
Ph
2












4,600,000


10

Marion

OH

Water

Libsta3on
for
Dual
Rail
Industrial
Park












2,000,000


10

Marion

OH

Water

Likens
Chapel
Road
sewer
replacement












1,750,000


12

Marion

OH

Water

3,400'
Columbia
sewer
lining












6,800,000


20

Marion

OH

Water

Presiden3al
neighborhood
sewer
replacement












4,500,000


20

Marion

OH

Water

CSO/SSO
abatement












4,000,000


50

Marion

OH

Water

WWTP
sludge
management
improvements












7,500,000


60

Mentor

OH

CDBG

Renovate
and
expand
Police
Department












2,200,000


50

Mentor

OH

Energy

Install
energy
efficient
ligh3ng
throughout
City
facili3es














100,000


4

Mentor

OH

Energy

Purchase
light
emiqng
diode
(LED)
traffic
signal
bulbs














100,000


4

Mentor

OH

Energy

City
Hall
and
Ice
Arena
HVAC
upgrades














500,000


6

Mentor

OH

Energy

Fire
sta3on
#3
Energy
Improvements














200,000


8

Mentor

OH

Public
Safety

Add
3
police
officers














255,000


3

Mentor

OH

Streets/Roads

Replace
600
linear
feet
of
bulkhead
walls
at
the
Mentor
Marina














300,000


4

Mentor

OH

Streets/Roads

Repair/resurface
sidewalk
and
parapet
wall
on
Center
Street
bridge
over
CSX
railroad
tracks.














350,000


5

Mentor

OH

Streets/Roads

Replace
undersized
culvert
carrying
the
Kellog
Creek
under
King
Memorial
Road














138,000


5

Mentor

OH

Streets/Roads

Full
depth
concrete
repairs
to
various
streets
throught
the
City.












1,000,000


10

Mentor

OH

Streets/Roads

Widen
and
resurface
Plains
Road
to
include
two
4'
bike
paths.














670,000


10

Mentor

OH

Streets/Roads

Resurfacing
of
various
asphalt
streets
throughout
the
City












1,000,000


12

Mentor

OH

Streets/Roads

Resurface
Tyler
Boulevard
from
SR
615
to
SR
306.












3,000,000


15

Mentor

OH

Streets/Roads

Widen
Heisley
Road
from
2
lanes
to
4
lanes
from
Jackson
Street
to
Mentor
Avenue
(US
20)












5,000,000


20

Milford

OH

Water

Milford

OH

Water

The
Garfield
Force
Main
Project
is
intended
to
eliminate
the
need
for
the
force
main
located
on
Race
Street
 that
currently
runs
between
our
water
wells
#1
and
#2.
This
has
been
cited
as
a
serious
concern
by
the
EPA
.
It
 will
alleviate
numerous
basement
fl












1,326,650


50

City

State

Program

New
Bremen

OH

Streets/Roads

Project
Descrip3on

New
Bremen

OH

Streets/Roads

New
Bremen

OH

Streets/Roads

North
Olmsted

OH

CDBG

North
Olmsted

OH

Energy

Front
Street,
Rummel
Creek,
Melrose
Place,
S.
Walnut
Street, Maurer
Place,
S.
Main
Street,
Sycamore
Street,
Kamman
Circle
and
N.
Franklin
Street
Asphalt
Resurfacing
 Projects ADA
Updates
to
all
City
Buildings
and
Facili3tes:
Based
upon
a
study
already
performed,
all
City
buildings
and
 facili3es
will
be
updated
to
current
ADA
standards Three
Wind
Turbines:
Installa3on
of
three
turbines
that
will
provide
energy
to
City
and
School
facili3es

North
Olmsted

OH

Public
Safety

Police
Sta3on
Improvements:
rehabilita3on
and
addi3on
to
the
exis3ng
City
of
North
Olmsted
Police
Sta3on

North
Olmsted

OH

Streets/Roads

Pavement
at
Springvale
Golf
Course
and
Ballroom
Parking
Lot

North
Olmsted

OH

Streets/Roads

North
Olmsted

OH

North
Olmsted

Emergency
Generators
for
Water
Treatment
Plant
and
St.
Clair
Place
Sewer
Lib
Sta3on
(equipment
supply
and
 installa3on) Canal
and
Cherry
Streets
Reconstruc3on
Projects

Funding
Required

Jobs














100,000


2














750,000


12














650,000


15














393,059


16














250,000


119












2,000,000


95
















69,125


3

Pavement
at
North
Olmsted
City
Hall
and
City
Service
Center
Parking
Lot














176,000


8

Streets/Roads

Root
Road
Cul‐De‐Sac:
Installa3on
of
a
city
standard
cul‐de‐sac
that
will
bring
the
street
to
current
standards














180,000


9

OH

Streets/Roads














375,000


18

North
Olmsted

OH

Streets/Roads

Columbia
Road/Lorain
Road
Intersec3on
Improvements:
Reconstruc3on
of
the
northwest
turning
radius
of
the
 intersec3on
that
will
provide
a
safer
situa3on
for
truck
and
pedestrian
traffic Sidewalk
Repair
Program:
Various
concrete
sidewalk
replacement
loca3ons
within
the
city.














400,000


19

North
Olmsted

OH

Streets/Roads












1,012,581


48

North
Olmsted

OH

Streets/Roads












1,619,096


77

North
Olmsted

OH

Water












5,000,000


20

North
Olmsted

OH

Water














987,200


47

North
Olmsted

OH

Water












1,200,000


57

North
Olmsted

OH

Water










30,000,000


1425

North
Olmsted

OH

Water










36,255,000


1722

North
Royalton

OH

CDBG

North
Porter
Road
Water
Line
Replacement:
replacement
of
a
12"
D.I.W.M.
that
has
had
many
failures
over
the
 past
8
years Walter
Road
Sewer
Relief:
Installa3on
of
an
underground
equiliza3on
sewer
that
will
help
prevent
sanitary
 sewer
back‐ups
in
residents'
homes Moderniza3on
of
City
of
North
Olmsted
Waste
Water
Treatment
Plant:Complete
rehabilita3on
of
exis3ng
 WWTP
bringing
it
to
today's
OEPA
standards Drinking
Water
Change
to
Avon
Lake
Water:
Convert
municipal
water
supply
from
City
of
Cleveland
Water
 Department
to
Avon
Lake
Water Service
Center

North
Royalton

OH

CDBG

North
Royalton

OH

North
Royalton

OH

North
Royalton

Fitch
Road
Reconstruc3on:
Complete
rehabilita3on
by
means
of
asphalt
recycling
and
reclama3on
of
exis3ng
 Fitch
Road Dover
Center
Road
Reconstruciton:
Complete
rehabilitaion
of
Dover
Center
Road
including
pavement,
curbs,
 sidewalks,
and
storm
sewers Holding
tanks
for
storm
water
in
sanitary
sewers










13,000,000


650

City
Hall










20,000,000


1000

Energy

Farmers
Market












3,000,000


150

Energy

Green
Retro
Fit












5,000,000


250

OH

Energy

Renewable
Energy
Facility










13,500,000


675

North
Royalton

OH

Housing

Senior
Housing










15,000,000


750

North
Royalton

OH

Public
Safety

Tornado
Warning
System














250,000


12

North
Royalton

OH

Public
Safety

Police
Communica3on
Upgrade












1,000,000


50

North
Royalton

OH

Public
Safety

Implementa3on
of
TLCI
Pedestrian
Program












8,000,000


400

North
Royalton

OH

Public
Safety

Regional
Police
and
Fire










12,000,000


600

North
Royalton

OH

Schools

Systemwide
Capital
Projects








120,000,000


6000

North
Royalton

OH

Streets/Roads

Widening
of
Route
82










28,000,000


1400

North
Royalton

OH

Transit

Enhanced
Transit
Wai3ng
Environment

North
Royalton

OH

Transit

North
Royalton

OH

North
Royalton

OH

North
Royalton Parma














500,000


25

Bus
Turnaround
and
Kiosks












3,000,000


150

Water

Wastewater
Plant










10,000,000


500

Water

Sewer
Interceptor










20,000,000


1000

OH

Water

Regional
Storm
Water
Ini3a3ve










40,000,000


2000

OH

CDBG

Ukrainian
Village
street
improvement














300,000


12

Parma

OH

CDBG

Storefront
Renova3on















200,000


80

Parma

OH

CDBG

Ridge
Road
parking
improvement












1,000,000


100

Parma

OH

CDBG

Fire
Department
Headquarters/Emergency
Opera3ons
Center/Regional
Dispatch
Center










12,000,000


300

Parma

OH

Public
Safety

D.A.R.E.
program














300,000


3

Parma

OH

Public
Safety

Parma
Technology
Improvement
Program
for
Police
Department/equipment














200,000


6

Parma

OH

Water

Dentzler
sanitary
sewer
construc3on












1,100,000


25

Parma

OH

Water

Grantwood/W.Ridgewood/Broadview
Rd.
sanitary
sewer
construc3on












1,100,000


25

Parma

OH

Water

Manhafen
Ave
improvements












1,245,830


25

Parma

OH

Water

Bradenton
sanitary
sewer












2,600,000


50

Parma

OH

Water

Chevrolet
Blvd.
storm
water
deten3on
basin












3,500,000


50

Parma

OH

Water

Citywide
sanitary
and
storm
sewer
construc3on/replacement












4,620,000


100

Parma

OH

Water

Citywide
water
main
replacement












4,950,000


100

Sidney

OH

Public
Safety












2,000,000


12

Sidney

OH

Streets/Roads














152,000


2

Sidney

OH

Streets/Roads














210,000


4

Sidney

OH

Streets/Roads














592,000


10

Sidney

OH

Streets/Roads

North
end
Fire
sta3on
‐
this
project
would
provide
a
fire
sta3on
to
the
fast
growing
north
end.
City
growth
in
 this
area
has
made
fire
and
EMS
response
well
beyond
na3onally
accepted
standards.
This
sta3on
would
house
 an
Engine
Co
and
an
EMS
unit. RUSSELL
ROAD
‐
St
MARYS
TRAFFIC
SIGNAL
UPGRADE:
This
work
will
involve
replacement
of
traffic
signals,
 including
addi3onal
turn
lane
indicators.
The
new
design
will
incorporate
a
"box"
arrangement
versus
the
 exis3ng
"diagonal"
span
wires.
 INNER
CITY
ALTERNATIVE
TRUCK
ROUTE:
This
project
enlarges
three
City
interse3ons
(radii)
to
alllow
safer
and
 more
efficient
truck
traffic
to
flow
around
the
downtown
business
district.
 CONTRACT
RESURFACING:
The
City
of
Sidney
annually
resurfaces
City
streets
by
a
pavement
ra3ng
 management
system.
This
work
includes
posible
asphalt
milling,
pavement
resurfacing,
pavement
markings,
 u3lity
adjustments,
and
repair/replacement
of
curb
and
 RUSSELL
ROAD
WIDENING,PHASE
II:
This
project
will
include
widening
of
Russell
Road
from
6th
Avenue
to
 Vandemark
Road.
This
work
also
includes
the
replacement
of
a
2‐lane
to
a
4‐lane
bridge
over
Interstate
75.













3,800,000


20

City

State

Program

Sidney

OH

Water

Sidney

OH

Water

Sidney

OH

Water

Sidney

OH

Water

Stow

OH

Streets/Roads

Stow

OH

Water

Stow

OH

Water

Strongsville

OH

Streets/Roads

Strongsville

OH

Streets/Roads

Toledo

OH

CDBG

SIDNEY
INDUSTRIAL
WATER
TOWER
PROJECT:
Installa3on
of
a
1,000,000
gallon
Water
Tower
for
the
City's
west
 side.
The
west
side
of
the
City
is
predominately
industrial
and
there
is
a
need
for
a
1,000,000
gallon
water
 tower
to
improve
pressure
and
fire
flows SIDNEY
WATER
SYSTEM
IMPROVEMENTS
PROJECT:
Water
Improvements
to
the
City's
Water
Distribu3on
 System
to
meet
the
present
and
future
needs.
This
project
involves
the
installa3on
of
water
transmission
 mains;
development
of
a
Lime
Sludge
Storage
Lagoon;
and SIDNEY
WATER
SOURCE
PROJECT:
Sidney
obtains
a
majority
of
its
raw
water
supply
from
the
Great
Miami
River.
 The
City
needs
to
find

an
alternate
water
source
because;
of
a
Mega‐Farm
within
our
watershed,
agriculture
 run‐off
into
the
Great
Miami
River;
muni SIDNEY
INDUSTRIAL
PARK
DEVELOPMENT:
This
project
would
make
252
acres
of
land
available
for
a
Mega‐ Industrial
site.
Installa3on
of
water
mains,
sewer
mains,
sewage
pump
sta3on,
drainage
and
road
 improvements
is
necessary
to
prepare
this
site
for
future
 Seasons
Road
Improvement
Project
involves
the
complete
upgrade
of
Seasons
Road
for
6,500
feet.

This
 roadway
will
serve
as
the
main
access
to
a
regional
economic
development
zone
and
is
necessary
for
the
 immediate
construc3on
of
a
new
100
bed
hospital.

 Seasons
Road
Water
Line
Extension.

This
waterline
extension
will
provide
service
to
a
proposed
new
100
bed
 hospital
that
will
serve
as
the
anchor
for
a
regional
economic
development
zone.
 Seasons
Road
Sanitary
Sewer
Line
Extension
is
necessary
to
provide
service
to
a
proposed
new
100
bed
 hospital
that
will
serve
as
the
anchor
for
a
regional
economic

development
zone.
 Foltz
Parkway
Extension. This
project
consists
of
extending
our
exis3ng
industrial
parkway
approximately
3,200
feet
and
installing
curbs,
 sidewalks,
storm
sewer,
sanitary
sewer
and
water
main.

This
will
create
access
to
182
acres
of
industrially
 zoned
 Pearl
Road
(CUY‐42‐0.90)
Widening
Project. This
project
consists
of
the
removal
of
approximately
one
mile
of
two
lane
asphalt
roadway
and
construc3ng
a
 new
five
lane
concrete
highway,
sidewalk,
curbs
and
storm
sewer
and
replacing
all
major
culverts. Pe Game
Court
Reconstruc3on
‐
Reconstruct
exis3ng
game
courts
at
various
City
park
loca3ons.

Project
Descrip3on

Toledo

OH

CDBG

Toledo

OH

Toledo

Funding
Required

Jobs












3,500,000


15












6,000,000


30










23,000,000


90












4,608,000


100












3,174,000


6825














647,312


4550












1,100,000


6825












3,792,558


100












5,678,000


200














300,000


4

Park
Infrastructure
Improvements
‐
Replace
and
repair
exis3ng
park
roads
and
parking
facili3es.














500,000


4

CDBG

Wilson
Park
‐
Construct
neighborhood
walking
path
and
provide
general
site
improvements.














165,000


4

OH

CDBG














400,000


5

Toledo

OH

CDBG

General
Park
Improvements
‐
Replace
picnic
tables,
benches,
signage,
miscellaneous
pavements,
address
ADA
 compliance,
vandalism
issues,
and
other
site
improvements
at
various
City
parks. Playground
Equipment
Replacement
‐
Replace,
repair
and
improve
neighborhood
playgrounds.














450,000


5

Toledo

OH

CDBG














500,000


6

Toledo

OH

CDBG












1,250,000


8

Toledo

OH

CDBG

Interna3onal
Park
Riverfront
Walk
Replacement
‐
Interna3onal
Park
boat
basin
is
a
signature
element
on
 Toledo’s
waterfront
landscape.

Original
construc3on
documents
could
be
u3lized
to
bid
and
reconstruct
the
 boat
basin
pedestrian
walks
immediately.
 Bike
Path
Program
‐
Construct,
repair
or
replace
up
to
5
miles
of
bike
path
as
part
of
emerging
bike
path
 system.

 Walbridge
Park
Riverfront
Access
Road
‐
Reconstruct
dilapidated
park
road.

Toledo

OH

CDBG

Toledo

OH

CDBG

Toledo

OH

Toledo












1,300,000


8

Brand
Whitlock/Albertus
Brown
Roadway
Improvements












4,000,000


10












1,500,000


12

CDBG

Promenade
Waterfront
Park
Reconstruc3on
Project
‐
Posi3oned
on
Toledo’s
riverfront
and
within
its
central
 business
district,
Promenade
Park
has
long
played
a
vital
role
as
a
public
gathering
space
for
musical
events
 and
fes3vals.

Built
over
30
years
a New
Neighborhoods
‐
Energy
Efficiency












4,000,000


20

OH

CDBG

NSP
Streets










10,000,000


25

Toledo

OH

CDBG

ACME
Plant












8,000,000


30

Toledo

OH

CDBG

Main
Street
Streetscape












5,000,000


30

Toledo

OH

CDBG

Public
Housing
Moderniza3on










26,400,000


120

Toledo

OH

Energy

Methane
Gas
Produc3on
Wells














174,000


5

Toledo

OH

Energy

Alternate
Fuel
for
Municipal
Vehicles












1,000,000


10

Toledo

OH

Energy

Energy
Retrofit
Collins
Park
Water
Treatment
Plant
Using
Wind
Power












1,000,000


10

Toledo

OH

Energy

Erie
Street
Market
solar
and
geothermal












1,500,000


10

Toledo

OH

Energy

Marina
District
‐
Green
Energy












2,000,000


10

Toledo

OH

Energy

Pipeline
Reloca3on














550,000


10

Toledo

OH

Energy

Collins
Park
Wind
Turbine
Project












2,000,000


13

Toledo

OH

Energy

Marina
Solar












3,000,000


15

Toledo

OH

Energy

Swan
Creek
‐
Alterna3ve
Energy












4,600,000


20

Toledo

OH

Energy

Fiberglas
Tower
solar
and
geothermal












2,000,000


25

Toledo

OH

Energy

Municipal
Building
Retrofit
for
Energy
Efficiency










18,000,000


25

Toledo

OH

Energy

Solar
Field












5,000,000


25

Toledo

OH

Energy

New
Schools
New
Neighborhoods,
Energy
Efficient
Homes












4,000,000


30

Toledo

OH

Energy

Fiberglas
Tower
‐
Energy
Efficiency












3,000,000


100

Toledo

OH

Energy

Mega
Garage
Facility
with
Municipal/County/State










25,000,000


120

Toledo

OH

Energy

University
of
Toledo
Scof
Park
Campus
‐
Advanced
and
Alterna3ve
Energy
Center










35,000,000


300

Toledo

OH

Energy

University
of
Toledo
Scof
Park
Campus
‐
Alterna3ve
Energy
Genera3on










40,000,000


500

Toledo

OH

Public
Safety

Vehicle
purchase












1,000,000


10

Toledo

OH

Public
Safety

Computer
upgrade












1,000,000


12

Toledo

OH

Public
Safety

COPS
hiring
grant












2,000,000


50

Toledo

OH

Streets/Roads

Hill
Widening,
Reynolds
to
Holland‐Sylvania














180,000


1

Toledo

OH

Streets/Roads

South
Ave.
Improvements,
Daniel
to
Spencer














330,000


2

Toledo

OH

Streets/Roads

Dorr
Street
Improvements,
Reynolds
to
Holland‐Sylvania














416,000


3

Toledo

OH

Streets/Roads

Sidewalks
Raised
by
Trees














500,000


3

Toledo

OH

Streets/Roads

Arena
Street
Improvements














610,000


4

Toledo

OH

Streets/Roads

Bancrob
St.
Improvements,
Reynolds
to
City
Limits














573,000


4

Toledo

OH

Streets/Roads

Bridge
Project,
Crabb
Rd.














550,000


4

City

State

Program

Toledo

OH

Streets/Roads

Brown
Stone
Improvements,
Southwyck
to
Reynolds

Project
Descrip3on

Funding
Required 












636,000


Jobs

Toledo

OH

Streets/Roads

Cheyenne
Improvements,
Heatherdowns
to
Southwyck














655,000


4

Toledo

OH

Streets/Roads

Douglas
Rd.
Improvements,
Laskey
to
Alexis














537,000


4

Toledo

OH

Streets/Roads

Hawley
Rd.
Improvements,
Western
to
Dorr














640,000


4

Toledo

OH

Streets/Roads

Hill
Ave.
Improvements,
Bryne
to
Westwood














575,000


4

Toledo

OH

Streets/Roads

South
Ave.
Improvements,
Detroit
to
Airport














620,000


4

Toledo

OH

Streets/Roads

Starr
Improvements,
Belt
to
Corp
Line














551,000


4

Toledo

OH

Streets/Roads

Bridge
Project,
Douglas
Road














700,000


5

Toledo

OH

Streets/Roads

Matzinger
Ave.
Improvements,
Lint
to
Enterprise














682,000


5

Toledo

OH

Streets/Roads

Nebraska
Improvements,
Westwood
to
RR
Tracks














784,000


5

Toledo

OH

Streets/Roads

Suder
Ave.
Improvements,
Manhafan
to
Abygail














682,000


5

Toledo

OH

Streets/Roads

Sylvania
Ave.
Improvements,
Phillips
to
Lagrange














797,000


5

Toledo

OH

Streets/Roads

Monroe
Street
Improvements,
Detroit
to
Central














906,000


6

Toledo

OH

Streets/Roads

South
Ave.
Improvements,
Reynolds
to
Byrne














883,000


6

Toledo

OH

Streets/Roads

Bennef
Rd.
Improvements,
Sylvania
to
Alexis












1,063,000


7

Toledo

OH

Streets/Roads

Bennef
Rd.
Improvements,
Sylvania
to
Alexis












1,063,000


7

Toledo

OH

Streets/Roads

Bridge
Project,
Champion
Street












1,000,000


7

Toledo

OH

Streets/Roads

Bridge
Project,
Collingwood












1,000,000


7

Toledo

OH

Streets/Roads

Hill
Ave.
Improvements,
Westwood
to
Detroit












1,122,000


7

Toledo

OH

Streets/Roads

Sign
Upgrade/Replacement












1,000,000


7

Toledo

OH

Streets/Roads

Traffic
Signal
LED's












1,000,000


7

Toledo

OH

Streets/Roads

Bridge
Project,
Marengo
Drive












1,200,000


8

Toledo

OH

Streets/Roads

Summit
St.
Improvements,
Galena
to
Lasalle












1,358,000


9

Toledo

OH

Streets/Roads

Collingwood
Ave.
Improvements,
Monroe
to
Cherry












1,476,000


10

Toledo

OH

Streets/Roads

Detroit
Ave.
Improvements,
Penrose
to
Glanzman












1,616,000


11

Toledo

OH

Streets/Roads

Michigan
St.
Improvements,
Lafayefe
to
Madison












1,690,000


11

Toledo

OH

Streets/Roads

Bancrob
St.
Improvements,
Secor
to
Upton












1,743,000


12

Toledo

OH

Streets/Roads

Hill
Ave.
Improvements,
Reynolds
to
Byrne












2,000,000


13

Toledo

OH

Streets/Roads

Roadway
Preventa3ve
Maintenance
Phase
1
‐
2009












2,000,000


13

Toledo

OH

Streets/Roads

Roadway
Preventa3ve
Maintenance
Phase
2
‐
2010












2,000,000


13

Toledo

OH

Streets/Roads

Downtown
Two‐Way
Street
Conversions














450,000


15

Toledo

OH

Streets/Roads

Arena/Stadium
Pedestrian
Malls












2,500,000


17

Toledo

OH

Streets/Roads

Marina
District
Pedestrian
Malls












3,000,000


20

Toledo

OH

Streets/Roads

Southwyck
Blvd.
Improvements,
En3re
Road












4,000,000


27

Toledo

OH

Streets/Roads

Chevron
Property












1,000,000


30

Toledo

OH

Streets/Roads

Marina
Dis3ct
Road












3,000,000


30

Toledo

OH

Streets/Roads

Secor
Road
Improvement,
Monroe
to
Laskey












4,500,000


30

Toledo

OH

Streets/Roads

Wheelchair
Ramps












4,500,000


30

Toledo

OH

Streets/Roads

Front
Street/Miami
Improvements












7,165,000


48

Toledo

OH

Streets/Roads

Front
Street












9,200,000


50

Toledo

OH

Streets/Roads

Swan
Creek
Road
Improvements












4,830,000


50

Toledo

OH

Streets/Roads

Intermodal
Connec3on
Road










10,000,000


100

Toledo

OH

Streets/Roads

Swan
Creek
Bridges










11,500,000


100

Toledo

OH

Transit

Burger
Street/Hecklinger
Pond
Embankment














150,000


1

Toledo

OH

Transit

Bridge
Pain3ng














600,000


4

Toledo

OH

Transit

Ofawa
River
Road
Embankment














550,000


4

Toledo

OH

Transit

Cullen
Park
Dredging














850,000


6

Toledo

OH

Transit

Marina
at
Marina
District












3,500,000


15

Toledo

OH

Transit

Airline
Yard












3,000,000


25

Toledo

OH

Transit

Swan
Creek
Amphitheatre












7,590,000


25

Toledo

OH

Transit

Swan
Creek
Docks












4,025,000


25

Toledo

OH

Transit

Swan
Creek
Pedestrian
Mall












1,150,000


25

Toledo

OH

Transit

Ofawa
River
Dredging












4,500,000


30

Toledo

OH

Transit

Swan
Creek
Pedestrian
Bridges












3,220,000


30

Toledo

OH

Transit

Swan
Creek
Marina
Terminal












4,325,000


40

Toledo

OH

Transit

Chevron
Property
Rail












5,000,000


50

Toledo

OH

Transit

Swan
Creek
Stabiliza3on










10,580,000


80

Toledo

OH

Transit

Swan
Creek
Canal










11,500,000


110

Toledo

OH

Water

Dead
End
Water
Mains














200,000


1

Toledo

OH

Water

Dexter
Alley
Sanitary
Sewer














160,000


1

Toledo

OH

Water

Minor
Storm
Drainage
Improvements














200,000


1

Toledo

OH

Water

Crabb
Rd.
Bridge














300,000


2

Toledo

OH

Water

Large
Diameter
Sewer
Rehabilita3on














239,000


2

Toledo

OH

Water

Dearden/Birdsall
Sanitary
Sewer














428,391


3

Toledo

OH

Water

Point
Place
Dike














400,000


3

Toledo

OH

Water

Delaware
Creek
Drainage
Improvement














700,000


5

Toledo

OH

Water

Delaware
Creek
SSO
Elimina3on














750,000


5

Toledo

OH

Water

Williams
Ditch
Improvements














700,000


5

Toledo

OH

Water

Op3mist
Park
Drainage












2,200,000


10

Toledo

OH

Water

Southwyck
Infrastrucutre












1,500,000


12

4

City

State

Program

Toledo

OH

Water

Water
Main
Replacement
Program

Project
Descrip3on

Funding
Required 










2,000,000


Jobs 13

Toledo

OH

Water

Toledo

OH

Water

Dorr
St.
24"
Main
Replacement












2,100,000


14

Marina
District
Improvements












2,000,000


Toledo

OH

15

Water

Swan
Creek
Infrastructure












4,300,000


University
Heights

50

OH

CDBG

Purchase
and
renova3on
of
foreclosed
and
vacant
houses












1,000,000


University
Heights

OH

CDBG

Repair
and
resurfacing
of
several
heavily
traveled
streets














500,000


University
Heights

OH

CDBG

Repair
and/or
replacement
of
sidewalk
curbs,
driveway
aprons














400,000


University
Heights

OH

CDBG

Restore
funding
for
low‐moderate
income
residents
to
repair
homes














200,000


University
Heights

OH

Housing

University
Heights

OH

Public
Safety

Construc3on
of
addi3onal
affordable
housing
allowing
growing
numbers
of
senior
ci3zens
to
remain
in
 community New
police
sta3on
for
32
officers
to
replace
original
sta3on
built
in
1948
for
12
officers

University
Heights

OH

Public
Safety

911
equipment
replacement
















85,000


0

University
Heights

OH

Public
Safety

Communica3ons
equipment
















30,000


0

University
Heights

OH

Public
Safety

Replace
3
police
vehicles
















78,000


0

University
Heights

OH

Public
Safety

Taser
nonlethal
weapons
system
















36,000


0

University
Heights

OH

Public
Safety

Replace
all
regulatory
signs
with
reflec3ve
material,
per
federal
mandate
















46,000


1

University
Heights

OH

Streets/Roads

Improvement
on
South
Belvoir
Boulevard












1,500,000


10

University
Heights

OH

Streets/Roads

Reconstruc3on
of
main
east‐west
artery,
Silsby
Road












2,000,000


10

University
Heights

OH

Transit

Purchase
one
12‐passenger
van
for
senior
ci3zen
travel
requirements
















40,000


University
Heights

OH

Transit

Purchase
second
van
to
replace
one
with
120,000
miles
















40,000


University
Heights

OH

Water

Annual
sewer
replacement
and/or
repairs














300,000


5

University
Heights

OH

Water

Citywide
cleaning
and
TV
of
sewers














300,000


5

University
Heights

OH

Water

Saybrook
Road
sewer
replacement














500,000


5

Warren

OH

CDBG

Municipal
parking
garage
rehab














450,000


9

Warren

OH

CDBG

Packard
Music
Hall
Parking
lot
Resurfacing
&
Expansion
project.














420,000


20

Warren

OH

CDBG














365,000


25

Warren

OH

CDBG

Packard
Music
Hall
Boiler
Room
Project
‐
replace
two
original
1955
boilers
with
energy
star
rated
boilers
and
 energy
control
system. Parking
garage
access
connector












1,450,000


29

Warren

OH

CDBG

Downtown
Business
Incubator
Project












1,700,000


34

Warren

OH

CDBG

Packard
Music
Hall
public
elevator
project
‐
access
to
balcony
level
‐
ADA














900,000


35

Warren

OH

CDBG

Packard
Music
Hall
‐
freight
elevator,
stage
updates,
office
renova3ons,
$
electrical
upgrades.














626,647


55

Warren

OH

CDBG












1,329,595


65

Warren

OH

Energy












6,500,000


30

Warren

OH

Public
Safety

Warren

OH

Streets/Roads

Packard
Music
Hall
HVAC
System
replacement
project
‐
energy
star
air
handlers,
chillers,
water
tower;
 plumbing,
pumps,
etc. Biosolids
Improvement
Project...Installa3on
of
a
Gassifica3on/Pyrolysis
system
that
will
convert
wastewater
 sludge
into
renewable
electrical
engery
genera3ng
15MW/day,
crea3ng
residual
bunker
oil
that
can
be
refined
 to
disel
fuel
and
reduce
the
facili Crime
Detec3on
Cameras
‐
install
ten
cameras
in
high
crime
loca3ons
that
will
remote
back
to
a
visual
 command
center. Griswold
Street
Reconstruc3on

Warren

OH

Streets/Roads

Warren

OH

Streets/Roads

Warren

OH

Warren














500,000


18












5,000,000













1,300,000


6












1,000,000


10

High
Street
Resurfacing












1,000,000


10

Niles
Road
Resurfacing












1,000,000


10

Streets/Roads

Mahoning
Avenue
Resurfacing












1,500,000


15

OH

Streets/Roads

Park
Avenue
Resurfacing












1,500,000


15

Warren

OH

Streets/Roads

City
Wide
Street
Resurfacing












2,000,000


20

Warren

OH

Streets/Roads

Elm
Road
Resurfacing












2,500,000


25

Warren

OH

Streets/Roads

Parkman
Road
Phase
2












2,500,000


25

Warren

OH

Streets/Roads

Warren
Greenway
Bike
Trail












4,000,000


40

Warren

OH

Streets/Roads

Parkman
Road
Phase
3












6,500,000


65

Warren

OH

Water














153,000


10

Warren

OH

Water












1,000,000


10

Warren

OH

Water














402,000


10

Warren

OH

Water














396,250


15

Warren

OH

Water














790,000


15

Warren

OH

Water

Warren

OH

Water

Coit
Drive
Improvements Stormwater
improvement
project
to
reduce
flooding
that
will
include
the
installa3on
644
linear
feet
of
new
 storm
sewer. Interceptor
Cleaning
and
Repair... 12,000
linear
feet
will
be
rehabilitated Millikin
Place
and
Altan3c
Street
Stormwater
Upgrade Stormwater
improvement
that
will
upgrade
the
exis3ng
storm
sewer
system
and
improve
the
inlet
capacity
of
 the
exis3ng
drain
by
extending
an
18
inch
storm
sewer
along
the
drainage
channel
and
add
an Eastland
Area
Drainage
Improvements Stormwater
improvement
that
will
upgrade
and/or
replace
2,054
linear
feet
of
storm
sewer
and
add
8
new
 catch
basins. Golf
Drive
and
Trumbull
Country
Club
Stormwater
Upgrade‐
 Stormwater
improvement
project
including
2
deten3on
basins
one
with
a
capacity
of
4.2
acre‐feet
and
one
 with
the
capacity
of
6.2
acre‐feet,
replacement
of
600
linear
feet
of
exis3ng
15"
storm
sew Tod
Avenue
Stormwater
Upgrade Stormwater
improvement
that
will
1,500
linear
feet
of
new
storm
sewer 422
Pump
Sta3on
Project
‐
Enable
the
City
to
enhance
pumping
pressures
along
the
422
corridor

Warren

OH

Water

Warren

OH

Water

Warren

OH

Warren














421,000


15












1,500,000


20

Enterprise
Drive
One
Million
Gallon
Storage
Tank
Project












2,500,000


20












2,000,000


25

Water

480
Volt
Elec3cal
Switch
gear
project
‐
Upgrade
electric
service
to
Filtra3on
Plant
to
allow
for
increased
 pumpage
requirements DAF
Replacement
Project

Removal
of
exis3ng
DAF
system
with
the
replacement
by
Gravity
Belt
Thickners.












2,000,000


25

OH

Water

Wastewater
Headworks
Improvement
Project...replace
exis3ng
screeners
and
grit
removal
system












2,500,000


30

Warren

OH

Water










15,000,000


100

Warren


OH

CDBG

Waterline
Replacement
Project
‐
100,000
linear
feet
of
12"
iron
duc3le
pipe.
This
project
will
promote
and
 allow
for
future
growth
and
development Road
construc3on Water
and
Sewer
improvements












7,000,000


200

City

State

Program

Westlake


OH

Streets/Roads

Project
Descrip3on

Westlake


OH

Streets/Roads

Westlake


OH

Streets/Roads

Westlake


OH

Streets/Roads

Westlake


OH

Streets/Roads

Youngstown

OH

CDBG

"Canterbury
Estates
Rehabilita3on"
this
project
includes
the
removal
and
the
replacement
of
a
dilapitated
 water
distribuqon
system,
the
rehabilita3on
of
the
drainage
system
and
the
reconstruc3on
of
the
raodway
 network.
This
project
is
the
final
phase "Hilliard
Blvd
Widening
Phase
2"
Hilliard
Blvd
is
a
major
east/west
Street
requiring
widening
from
two(2)lanes
 to
five(5)
lanes,
including
new
watermains
and
sewers.
These
improvements
will
greatly
improve

sabey
of
the
 roadway
and
create
&
retain
jobs.
 "Clague
Road
Rehabilita3on"
This
project
includes
the
removal
and
replacement
of
the
roadway,watermains
 and
storm
sewers
on
Clauge
Road.
This
infrastructure
dates
back
to
the
1920's.
This
roadway
is
the
major
 north/south
connector
from
I‐90
to
I‐480
in
e Implementa3on
of
Landlord
registra3on
program

Youngstown

OH

CDBG

Youngstown

OH

Youngstown

OH

Youngstown

Funding
Required

Jobs












3,100,000


110












4,000,000


150












4,000,000


160














250,000


10

Removal
of
neighborhood
Slum/Blight












2,000,000


100

CDBG

Expansion
of
Youngstown
Ini3a3ve
Economic
Development
Programs












2,500,000


400

Housing

Comple3on
of
Youngstown
Metropolitan
Housing
Authority
HOPE
VI
Project












1,100,000


150

OH

Public
Safety

Expansion
of
Community
Policing
Program
‐
Hire
addi3onal
officers












1,000,000


25

Youngstown

OH

Public
Safety

Purchase
new
police
crusiers














600,000


25

Youngstown

OH

Public
Safety

Purchase
of
Gunshot
Loca3on
System












1,500,000


50

Youngstown

OH

Streets/Roads

Wick
Ave.
Resurfacfing
&
Safety
upgrades














650,000


75

Youngstown

OH

Streets/Roads

SR
7/62/170/Market
St./Glenwood
Ave./South
Ave/
Resurfacing














600,000


100

Youngstown

OH

Streets/Roads

Hazel
Street
Roadway
Extension












1,500,000


200

Youngstown

OH

Transit

Citywide
Signaliza3on
Upgrades












1,000,000


100

Youngstown

OH

Water

Wastewater
Treatment
Plant
Repairs












1,500,000


75

Youngstown

OH

Water

Kirkmere
Sanitary
Sewer
Repairs












1,100,000


80

Zanesville

OH

Energy

Installa3on
of
Varma3c
LightMaster
Products
on
all
city
street
ligh3ng.














200,000


75

Zanesville

OH

Streets/Roads














590,597


30

Zanesville

OH

Streets/Roads












1,244,968


2500

Zanesville

OH

Transit












2,342,058


2000

Zanesville

OH

Water

2009
City
Wide
Overlays This
project
consists
of
18
miles
of
road
resurfacing
and
5400
feet
of
water
lines
replacement.

The
project
 would
create
a
minimum
of
30
jobs
associated
with
construc3on
contracts
to
perform
the
work.

The
city
has
 received
$816 State
Route
93
Turn
Lane This
project
consists
of
the
construc3on
of
a
turn
lane
on
SR
93
that
will
access
a
new
entrance
into
the
 EastPointe
Business
Park
as
part
of
the
Master
Plan
for
the
expansion
of
the
Job
Ready
Site
that
is
es3mated
to
 add
over
 JRS
Rail
Spur
Extension This
project
consists
of
the
construc3on
and
installa3on
of
11,131.51
LF
of
rail
to
service
the
Job
Ready
Site
 which
is
es3mated
to
add
over
2,000
jobs
when
completed
and
cer3fied
in
December
2009.
 CSO
R‐13
Sewer
Separa3on
Project This
project
will
eliminate
CSO
(Combined
Sewer
Overflows)
R‐13
by
separa3ng
the
sanitary
and
storm
sewers.

 The
project
has
been
mandated
by
the
Ohio
EPA
to
be
a
part
of
the
City
of
Zanesville’s
Long
Term
Control
Plan.














385,000


25

Zanesville

OH

Water














227,000


25

Zanesville

OH

Water
















30,000


25

Zanesville

OH

Water

Tileston
Avenue
Drainage
Project This
project
will
provide
improved
drainage
and
flood
protec3on
for
a
low
to
moderate
income
area
of
the
City
 of
Zanesville.

The
project
will
consist
of
approximately
2000
feet
of
24
inch
storm
sewer
and
appurtenances.















260,000


25

Zanesville

OH

Water














510,000


30

Zanesville

OH

Water












2,347,369


500

Zanesville

OH

Water












9,000,000


500

Zanesville

OH

Water














164,000


2000

Edmond

OK

Streets/Roads










10,000,000


100

Midwest
City

OK

Streets/Roads


Wayne
Avenue
Waterline
Project This
project
will
replace
a
deficient
water
main
and
provide
improved
fire
protec3on
along
Wayne
Avenue
prior
 to
a
street
resurfacing
project.

The
project
will
consist
of
approximately
7200
feet
of
8
inch
water
main

 The
EastPointe
Sanitary
Expansion This
project
consists
of
the
construc3on
and
installa3on
of
2
lib
sta3ons,
approximately
11,650
LF
of
gravity
 sanitary
sewer
and
approximately
13,650
LF
of
sanitary
force
main.
This
project
will
increase
the
capacity Water
Treatment
Plant
Upgrade: This
Project
consists
of
the
construc3on
of
a
new
10
MGD
manganese
and
iron
removal
water
treatment
plant.
 This
plant
is
cri3cal
to
the
economic
and
popula3on
growth
of
Zanesville
and
surrounding
area
as
the
exis3ng
 pla New
Backwash
Waste
Line
 This
Project
is
a
separate
component
of
the
new
water
treatment
plant.
Using
a
crew
of
up
to
6
full
3me
 employees,
the
City
will
construct
a
12
inch
backwash
waste
line,
approximately
3500
feet
long,
from
the
water
 treatment
plant The
Oklahoma
Department
of
Transporta3on
is
currently
improving
Broadway
Extension
between
I‐44
and
the
 City
of
Edmond.

The
improvements
include
the
interchange
with
Memorial
Road
and
Kelley
Avenue.

 Construc3on
on
this
project
began
in
August
2008
 Mill
and
overlay
eight
miles
of
roadway












2,100,000


3

Midwest
City

OK

Streets/Roads

Replace
damaged
sidewalks
in
residen3al
areas












1,300,000


3

Midwest
City

OK

Streets/Roads

Construct
one
mile
of
sound
barrier
wall














500,000


5

Midwest
City

OK

Streets/Roads

Construct
trails
for
recrea3onal
uses
and
other
modes
of
transporta3on












5,000,000


5

Midwest
City

OK

Streets/Roads

Install
two
miles
of
ligh3ng,
r/w
fencing
and
landscaping












2,300,000


5

Midwest
City

OK

Streets/Roads

Reconstruct
nine
intersec3ons
within
the
city












3,400,000


10

Midwest
City

OK

Streets/Roads

Replace
structurally
deficient
bridge
on
Midwest
Blvd.












2,800,000


15

Midwest
City

OK

Streets/Roads

Construct
light
rail
first
phase
of
system













4,000,000


25

Moore

OK

Streets/Roads

ADA
ramps
and
pedestrian
signal
installa3on
‐
13
intersec3ons
City‐wide














200,000


2

CSO
R‐17
&
CSO
R‐19
Sewer
Separa3on
Project This
project
will
eliminate
CSO’s
(Combined
Sewer
Overflows)
R‐17
and
R‐19
by
separa3ng
the
sanitary
and
 storm
sewers.

The
project
has
been
mandated
by
the
Ohio
EPA CSO
R‐21
High
Water
Protec3on
Project This
project
will
provide
protec3on
of
CSO
(Combined
Sewer
Overflow)
R‐21
from
impacts
of
high
water
levels
 of
the
Muskingum
River.

The
project
has
been
mandated
by
the
Ohio
EPA
to
be
a
part
of
the
City
of
Zanesville.

City

State

Program

Moore

OK

Streets/Roads

Roadway
striping
and
signage,
City‐wide

Project
Descrip3on

Funding
Required 












800,000


Jobs

Moore

OK

Streets/Roads

S.
4th
Street/I‐35
Overpass
bridge
redecking












1,500,000


14

Moore

OK

Streets/Roads

NW
27th
Street
(Santa
Fe
to
Janeway)
Reconstruct,
grading,
drainage,
sidewalks












2,335,000


22

Moore

OK

Streets/Roads

Telephone
Road
(SW
4th
to
NW
5th)
Reconstruct,
grading,
drainage,
sidewalks












2,988,000


28

Moore

OK

Streets/Roads

N
12th
Street
(Eastern
to
Buck
Thomas
Park)
Reconstruct,
grading,
drainage,
sidewalks












3,642,000


34

Moore

OK

Streets/Roads

N
12th
Street
(I‐35
to
Eastern)
Reconstruct,
grading,
drainage,
sidewalks












4,670,000


43

Moore

OK

Streets/Roads

Janeway
Avenue
(NW
12th
to
NW
27th)
Reconstruct,
grading,
drainage,
sidewalks












6,000,000


55

Moore

OK

Streets/Roads

I‐35/S.
34th
Street
Bridge
Project,
construct
new
bridge
across
I‐35










16,000,000


147

Muskogee

OK

Airport

4/22
Runway
Safety
areas
‐
Davis
Field
Airport












1,000,000


25

Muskogee

OK

Airport

Taxiway
Charlie
Pavement
Rehabilita3on
at
Davis
Field
Airport












2,500,000


30

Muskogee

OK

Housing

The
Housing
Rehabilita3on
and
Neighborhood
Redevelopment
Program












1,500,000


24

Muskogee

OK

Streets/Roads

Mar3n
Luther
King
Rehabilita3on
from
12th
to
24th












1,200,000


30

Muskogee

OK

Water

Anthony
Street
Drainage












1,422,500


25

Muskogee

OK

Water

Chandler
Road
Deten3on
pond












1,557,000


25

Muskogee

OK

Water

Elliof
Street
Drainage












1,221,000


25

Muskogee

OK

Water

Sec3on
of
Sewer
Interceptor
Line
along
"Coody
Creek"












1,000,000


25

Muskogee

OK

Water

Upgrade
and
Expand
Water
Treatment
Plant










30,000,000


125

Norman

OK

Amtrak

Heartland
Flyer
extension
to
Kansas












3,000,000


Norman

OK

CDBG

Sidewalks
















71,915


1

Norman

OK

CDBG

Water
lines














140,200


4

Norman

OK

CDBG

Street
projects














623,619


8

Norman

OK

CDBG

Downtown
revitaliza3on
efforts












1,500,000


20

Norman

OK

Energy

cng
fueling
sta3on














350,000


5

Norman

OK

Energy

methane
co‐genera3on
system












1,200,000


10

Norman

OK

Public
Safety

community
policing












1,500,000


23

Norman

OK

Streets/Roads

sidewalk
accessibility














560,000


10

Norman

OK

Streets/Roads

Robinson
Street
underpass












2,959,911


35

Norman

OK

Streets/Roads

West
Main
bridge
construc3on
and
maintenance












3,300,000


50

Norman

OK

Streets/Roads

bike
paths












3,000,000


60

Norman

OK

Streets/Roads

road
reconstruc3on












2,000,000


60

Norman

OK

Transit

Quiet
zone
improvements

Norman

OK

Transit

Bus
service
expansion

Norman

OK

Water

water
line
repairs

Norman

OK

Water

sanita3on
transfer
sta3on
renova3on

Norman

OK

Water

wastewater
treatment
plant
improvements










33,200,000


51

Norman

OK

Water

water
plant
upgrades












7,550,000


58

Norman

OK

Water

sewer
interceptor
lines
&
lib
sta3ons












9,000,000


64

Norman

OK

Water

new
water
wells
&
distribu3on
system












8,802,800


83

Oklahoma
City

OK

Airport

Purchase
3
CNG
parking
shufle
buses














240,000


0

Oklahoma
City

OK

Airport

Re‐pave
North
and
West
Shufle
parking
lots
at
Will
Rogers
World
Airport














225,000


2

Oklahoma
City

OK

Airport

Transformer
replacement
for
taxiway
lights
at
Will
Rogers
Airport














350,000


4

Oklahoma
City

OK

Airport

Extend
water
and
sanitary
sewer
lines
along
S.
Portland
Avenue
at
Will
Rogers
World
Ariport














400,000


5

Oklahoma
City

OK

Airport

Intall
taxiway
lights
at
Clarence
E.
Page
Airport














560,000


6

Oklahoma
City

OK

Airport

Reconstruct
taxiways
at
Clarence
E.
Page
airport














660,000


7

Oklahoma
City

OK

Airport

Replace
automated
airfield
ligh3ng
at
Wiley
Post
Airport














600,000


7

Oklahoma
City

OK

Airport

Construct
permeter
fencing
at
Wiley
Post
Airport












2,000,000


22

Oklahoma
City

OK

Airport

Upgrade
taxiway
ligh3ng
at
Will
Rogers
World
Airport












2,300,000


26

Oklahoma
City

OK

Airport

Taxi
lane
and
infrastructure
improvements
at
Wiley
Post
Airport












2,500,000


27

Oklahoma
City

OK

Airport

Reconstruct,
widen
and
extend
runway
17R/35L
at
Wiley
Post
Airport












4,000,000


44

Oklahoma
City

OK

CDBG

Drainage
‐
SW
51st
Street
and
Land
Avenue














375,000


4.17

Oklahoma
City

OK

CDBG

Drainage
‐
NE
16th
Street
and
Peachtree














400,000


4.44

Oklahoma
City

OK

CDBG

Drainage
‐
NW
36th
Street
to
NW
38th
Street,
west
of
Amelia














500,000


5.56

Oklahoma
City

OK

CDBG

Drainage
‐
Purchase
of
River
Skimmer
Equipment














500,000


5.56

Oklahoma
City

OK

CDBG

Demoli3on
of
old
post
office
facility
at
SW
5th
and
Hudson












1,000,000


15

Oklahoma
City

OK

CDBG

Drainage
‐
NW
25th
Street
and
Peniel
Avenue,
Phase
II












1,400,000


15.56

Oklahoma
City

OK

CDBG

Drainage
‐
SW
15th
Street
and
McKinley
Avenue
to
Twincreek












1,465,000


16.28

Oklahoma
City

OK

CDBG

Southern
Oaks
Library,
3600
S.
Walker
Avenue












1,840,000


20.44

Oklahoma
City

OK

CDBG












3,000,000


33

Oklahoma
City

OK

CDBG

Emergency
home
repairs
for
senior
ci3zens
and
low
income
homeowners
(low
income
census
tracts)
to
 improve
200
homes.
 Drainage
‐
Deten3on
pond
in
Oliver
Park
in
the
vicinity
of
SW
29th
Street
and
Santa
Fe
Avenue,
Phase
II












4,400,000


48.89

Oklahoma
City

OK

CDBG

Construct
sidewalks
in
Neighborhood
Revitaliza3on
Strategy
Area
up
to
400,000
linear
feet
of
sidewalks












5,000,000


60

Oklahoma
City

OK

CDBG












5,000,000


60

Oklahoma
City

OK

CDBG

Oklahoma
City

OK

CDBG

Renovate
buildings
to
create
a
resource
center
and
housing
outreach
center
in
conjunc3on
with
Homeless
 Alliance.
 Renovate
former
JC
Penney
Building
(donated
to
the
City
and
transferred
to
La3no
Community
Development
 Agency)
for
use
as
a
community
center
and
public
service
center.
 Pioneer
Library,
vicinity
of
SW
89th
Street
between
I‐44
and
Santa
Fe
Avenue

Oklahoma
City

OK

CDBG

Oklahoma
City

OK

CDBG

Oklahoma
City

OK

Oklahoma
City

OK

Oklahoma
City

OK

8














500,000


4












2,700,000


30














499,999


15












3,500,000


20












5,500,000


61












5,800,000


64.44

Drainage
‐
NW
3rd
Street
to
NW
5th
Street
and
Ann
Arbor
to
Oklahoma
River












6,000,000


66.67

New
Library,
Northwest
Oklahoma
City










10,240,000
 113.8

Energy

Install
one(1)
CNG
fueling
sta3ons












1,000,000


11.11

Energy

Weatherize
City
Facili3es












1,300,000


14.44

Energy

Install
six(6)
CNG
fueling
sta3ons












6,000,000


66.67

City

State

Program

Oklahoma
City

OK

Housing

Modernize
160
units
of
public
housing

Project
Descrip3on

Funding
Required 










2,400,000


Jobs 30

Oklahoma
City

OK

Housing

Rehabilitate
public
housing
for
persons
with
disabili3es.













5,000,000


60

Oklahoma
City

OK

Public
Safety

New
Fire
Sta3on,
Bricktown












1,875,000


20.83

Oklahoma
City

OK

Public
Safety

New
Fire
Sta3on,
Northeast
Oklahoma
City












1,875,000


20.83

Oklahoma
City

OK

Schools

Student
Desktop
and
teacher
laptop
computer
replacements/purchase












4,000,000


0

Oklahoma
City

OK

Schools

Nichols
Hills












2,450,000


27

Oklahoma
City

OK

Schools

Putnam
Heights












2,700,000


30

Oklahoma
City

OK

Schools

Lee












2,910,000


32

Oklahoma
City

OK

Schools

Hoover
Elementary












3,900,000


43.3

Oklahoma
City

OK

Schools

North
Highland
Elementary












4,800,000


53

Oklahoma
City

OK

Schools

Coolidge













4,900,000


54

Oklahoma
City

OK

Schools

Stand
Wa3e












5,130,000


57

Oklahoma
City

OK

Streets/Roads

Signal
Improvements
‐
NW
16th
and
May
Avenue














200,000


2.22

Oklahoma
City

OK

Streets/Roads














320,000


3.56

Oklahoma
City

OK

Streets/Roads














320,000


3.56

Oklahoma
City

OK

Streets/Roads














335,500


3.73

Oklahoma
City

OK

Streets/Roads

Maintenance
‐
Chip
&
Seal
Program,
AC
Overlay
64
Lane
Miles
(favoring
wards
with
rural
roads
at
a
cost
of
 $5,000
per
lane
mile) Maintenance
‐
Equipment
and
labor
to
support
the
addi3onal
38
lane
miles
at
at
cost
of
approximately
$5,000
 per
lane
mile
(partner
with
Coun3es) Maintenance
‐
Microresurfacing
Program,
purchase
addi3onal
Micro‐Paver
and
keep
salvage
machine
to
 support
the
addi3onal
64
lane
miles Bridge
Rehab
‐
Cimarron
Road,
0.8
Mi
S
of
SW
15th














450,000


5

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Frisco
Road,
0.7
mi
S
of
SW
59th














450,000


5

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Mustang
Road,
South
of
NW
164th














450,000


5

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Over
I‐40
at
F
Avenue














500,000


5.56

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Over
I‐40
at
Luther
Road














500,000


5.56

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Over
I‐40
at
Post
Road














500,000


5.56

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Over
I‐40
at
Triple
X














500,000


5.56

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Over
I‐40
at
Westminster
Road














500,000


5.56

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
SW
29th
0.3
mi
east
of
Portland
Avenue














550,000


6.11

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
SW
29th,
0.3
Mi
E
of
Portland
Ave














650,000


6.11

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Richland
Road,
0.3
Mi
N
of
NW
10th














620,000


6.89

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Rockwell,
0.6
Mi
S
of
SW
15th














620,000


6.89

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
SW
59th
0.6
mi
east
of
Cemetery
Road














620,000


6.89

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Penn
Ave
0.3
mi
South
of
SW
149th














635,000


7.06

Oklahoma
City

OK

Streets/Roads














700,000


7.78

Oklahoma
City

OK

Streets/Roads

Maintenance
‐
Chip
&
Seal
Program,
Full
Depth
Repair,
14
lane
miles
(two
per
ward
at
a
cost
of
$50,000
per
 lane
mile) Bridge
Rehab
‐
SW
15th
0.6
mi
east
of
Cimarron
Road














740,000


8.22

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
SW
15th,
0.6
Mi
E
of
Cimarron
Road














740,000


8.22

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Richland
Road,
0.6
Mi
S
of
NW
36th














825,000


9.17

Oklahoma
City

OK

Streets/Roads

Trails
‐
North
Grand
Boulevard












1,000,000


11.11

Oklahoma
City

OK

Streets/Roads

Signal
Improvements
‐
ITS
Citywide












1,000,000


11.12

Oklahoma
City

OK

Streets/Roads

Bridge
Rehab
‐
Frisco
Road,
0.8
mi
S
of
NW
164th












1,030,000


11.44

Oklahoma
City

OK

Streets/Roads

Trails
‐
Earlywine
S
May
to
Blackwelder












1,500,000


16.67

Oklahoma
City

OK

Streets/Roads












2,460,000


27.33

Oklahoma
City

OK

Streets/Roads

Maintenance
‐
Microresurfacing
Program,
164
lane
miles
at
a
cost
of
$15,000
per
lane
mile
(preserve
exis3ng
 roadways
with
decent
ra3ngs) Street
Rehabilita3on
‐
Widening
of
NW
164th
Street
from
Pennsylvania
Avenue
to
Western
Avenue












3,500,000


38.89

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
Widening
of
North
May
Avenue
from
NW
178th
Street
to
NW
192nd
Street












3,620,000


40.22

Oklahoma
City

OK

Streets/Roads

Trails
‐
Tinker
AFB
to
Draper
Lake












3,800,000


42.22

Oklahoma
City

OK

Streets/Roads

Signal
Improvements
‐
Synchroniza3on
of
traffic
signals
City‐wide
using
Wi‐Fi
Technology












4,000,000


44.44

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
Construct
Quiet
Zone
Improvements
at
Rail
Crossings
Downtown












5,000,000


55.56

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
Western
Avenue
from
SW
134th
Street
to
SW
179th
Street










11,000,000
 122.2

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
Lincoln/Byers
Interchange
on
the
new
I‐40
alignment










16,000,000
 177.8

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
45
lane
miles
Citywide










25,622,500
 284.7

Oklahoma
City

OK

Streets/Roads

Street
Resurfacing
‐
382
Lane
Miles
Arterial
Resurfacing










38,155,000
 423.9

Oklahoma
City

OK

Streets/Roads

Street
Rehabilita3on
‐
Fully
fund
I‐40
Reloca3on
and
the
new
Boulevard
to
replace
the
exis3ng
alignment










98,000,000


Oklahoma
City

OK

Transit

Purchase
fibeen(15)
35'
Transit
Buses












5,250,000


0

Oklahoma
City

OK

Transit

Improve
Access
to
Bus
Stops














500,000


5.56

Oklahoma
City

OK

Transit

Ferry
Boat
Maintenance
Facility












1,400,000


15.56

Oklahoma
City

OK

Transit

Real
Time
bus
informa3on












1,500,000


16.67

Oklahoma
City

OK

Transit

Improvements
to
bus
maintenance
facility












2,000,000


22.22

Oklahoma
City

OK

Water

Replacement
of
8"
Sanitary
Sewer
Mains
from
NE
10th
to
16th
from
Fonshill
to
Missouri
(4,405
b)














500,000


5.56

Oklahoma
City

OK

Water

Replacement
of
8"
Sanitary
Sewer
Mains
from
NW
45
to
50
‐
Western
to
Classen
(4,100
b)














500,000


5.56

Oklahoma
City

OK

Water

6"
Water
Main
Replacement
from
NW
34th
to
NW
35th
b/w
Dewey
to
Robinson
(2,750
b)














550,000


6.11

Oklahoma
City

OK

Water

12"
Water
Main
Replacement
along
NW
50th
from
Miller
Place
to
Penn.
(3,900
b)














600,000


6.67

Oklahoma
City

OK

Water














900,000


10

Oklahoma
City

OK

Water














960,000


10.67

Oklahoma
City

OK

Water

Replace
6"
&
8"
Water
Mains
along
NW
84th
from
Western
to
Waverly;
Agnew
‐
Villa
b/w
SW
51st
to
SW
55th
 (7,300
b) Replace
6"
Water
Mains
from
NW
71
to
NW
72,
Hammond
to
N.
MacArthur
(Warr
Acres)
4,600
b;
and
Along
 NW
38th
b/w
Pennsylvania
Ave.
&
Youngs
Blvd.
2,600
b Replacement
of
8"
Sanitary
Sewer
Mains
b/w
NW
37th
and
41st
from
May
to
Chicago
(10,400
b)












1,200,000


13.33

Oklahoma
City

OK

Water

8"
Water
Main
Replacement
near
NW
58
‐
NW
60th
St
from
MacArthur
to
Redmond












1,350,000


15

Oklahoma
City

OK

Water












1,700,000


19

Oklahoma
City

OK

Water

6"
and
12"
Water
Main
Replacement
from
Penn
to
Haverhill
Pl.
b/w
Lanesboro
Dr.
and
Plymouth
Dr.
(Village
 Project)
(11,900
b) Replacement
of
66‐inch
Aerial
Crossing
near
NE
58th
and
Grand
Blvd












2,000,000


22.22

1089

City

State

Program

Oklahoma
City

OK

Water

2.5
miles
48"
Mid
Urban
Sanitary
Sewer
Relief
Line;
SW
15,
Rockwell
to
1/2
mile
west
of
Council

Project
Descrip3on

Funding
Required 










5,000,000


Jobs 55.56

Oklahoma
City

OK

Water

60"
Raw
Water
Transmission
Main
Reloca3on
near
Byng,
OK












5,000,000


55.6

Oklahoma
City

OK

Water

Replacement
of
60"
PCCP
along
Douglas
Ave
b/w
SW
74th
and
SW
36th
(12,000
b)












8,500,000


94.44

Oklahoma
City

OK

Water

Chisholm
Creek
SS

Relief
Main
near
NW
150
&
Western
to
NW
115
&
Penn:
1
mile
36"
and
1.5
mile
24"












9,000,000


100

Oklahoma
City

OK

Water

3
mile
‐
48"
Water
Transmission
Main
along
SE
164th
from
Telephone
Road
to
Pennsylvania










10,000,000
 111.1

Oklahoma
City

OK

Water

New
12
MG
Clearwell
at
Hefner
Water
Treatment
Plant











10,000,000
 111.1

Oklahoma
City

OK

Water










12,000,000
 133.3

Oklahoma
City

OK

Water

1
Mile
48"
Water
Transmission
Main
from
Hefner
WTP
to
east
of
Hefner
Pkwy;
and
2
miles
42"
Water
 Transmission
Main
from
Hefner
Pkwy
to
Western
along
Hefner
Rd 6
mile
‐
48"
Water
Transmission
Main
from
SW
164th
&
Penn
to
SW
104th
&
Portland

Oklahoma
City

OK

Water

Chisholm
Creek
Watewater
Treatment
Plant
5
MGD
Expansion










18,000,000


Oklahoma
City

OK

Water

Atoka
Pipeline
Pump
Sta3on
Rehabilita3on










43,000,000
 477.8

Ponca
City

OK

CDBG

Ponca
City

OK

CDBG

Street
Maintenance
Projects: Shirlee‐14th
Street
to
500'
East Clarke
Street
‐
1509
‐
1617 McGraw
Drive
‐
1300
‐
1404 Meadow
Lane
‐
Prospect
to
Crawford Ash
Street
‐
Overbrook
to
Greenwood Sanitary
Sewer
Rehabilita3on
1200
Block
of
Princeton
Between
Oklahoma
to
Central
Avenue














130,000


10

Ponca
City

OK

CDBG

Lake
Ponca
Raw
Water
Transmission
Main
and
Valve
Repair














300,000


15

Ponca
City

OK

CDBG

Brentwood
Lib
Sta3on
Upgrade














500,000


20

Ponca
City

OK

CDBG

Eastside
Sanitary
Sewer
Interceptor












1,400,000


20

Ponca
City

OK

CDBG

Sanitary
Sewer
Interceptor

Between
Pizza
Hut
&
J.
C.
Penny's














500,000


20

Ponca
City

OK

CDBG

Stoneridge
Lib
Sta3on
Elimina3on














350,000


20

Ponca
City

OK

CDBG

Reconstruc3on
of
Pecan
Road
(Lake
Road
to
Juanita)












1,000,000


30

Ponca
City

OK

CDBG

WTP
Lime
Feed
&
Storage
System
Upgrade












2,000,000


30

Ponca
City

OK

CDBG

Downtown
Sidewalk
Project












3,000,000


40

Ponca
City

OK

CDBG

Osage
Lib
Sta3on
to
Re‐Route
Sanitary
Sewer
from
Refinery
Complex












2,300,000


40

Ponca
City

OK

CDBG

Ponca
City
Aqua3c
&
Family
Center










22,500,000


110

Ponca
City

OK

CDBG

Ponca
City
Conference
Center/Auditorium










37,000,000


135

Sand
Springs

OK

CDBG

Streetscape
Improvements
&
50/50
Facade
Grants/Leverage
Local
Funds














500,000


10

Sand
Springs

OK

Energy

Green
U3lity
Savings
Project:
Retrofit
Pub
Bldgs;
Replace
Meters;
Convert
to
Fixed‐Pt
Auto.Mtr.Read










10,000,000


40

Sand
Springs

OK

Streets/Roads

Add
&
Upgrade
Handicap
Access
Ramps
at
Intersec3ons














360,000


6

Sand
Springs

OK

Streets/Roads

Upgrade
Traffic
Signal
Heads
(LED),
Controllers,
Detec3on
(20
Intersect)














160,000


6

Sand
Springs

OK

Streets/Roads

Asphalt
Paving
&
Upgrading
Alleys
in
Original
Townsite
Area














250,000


12

Sand
Springs

OK

Streets/Roads

Storm
Sewer
Piping
&
Outlet
in
conjunc3on
with
Morrow
Rd
Overlay
Project












1,500,000


15

Sand
Springs

OK

Streets/Roads

129th
W
Ave
(41st
St
to
56th
St)
Asphalt
Overlay,
Restripe














300,000


18

Sand
Springs

OK

Streets/Roads

Morrow
Rd/W21st
St
(Adams
Rd
to
81st
W
Ave)
Asphalt
Overlay,
Restripe














200,000


18

Sand
Springs

OK

Streets/Roads

Airport
Road
(Asphalt
Overlay,
Restripe
&
Dress
Eroded
Slopes















750,000


24

Sand
Springs

OK

Streets/Roads

East
2nd
Street
(Adams
Rd
to
Main
St)
Mill
Surface,
Asphalt
Overlay,
Restripe














350,000


24

Sand
Springs

OK

Streets/Roads














700,000


24

Sand
Springs

OK

Streets/Roads

Morrow
Rd
(Main
St
to
Adams
Rd) Mill
Surface,
Asphalt
Overlay,
Restripe,
Repair
&
Replace
Curbs Asphalt
Paving
of
Soccer
Field
Parking
Lot














300,000


25

Sand
Springs

OK

Streets/Roads

Avery
Drive
(65th
W
Ave
to
SH
97)
Stabilize
Embankment
&
Asphalt
Overlay,
Restripe












2,000,000


25

Sand
Springs

OK

Streets/Roads

McKinley
Ave
(Broadway
to
Osage
County
Line)
Spot
Repair
Failing
Subgrade
&
Asphalt
Overlay,
Restripe














450,000


25

Sand
Springs

OK

Streets/Roads

Old
North
Rd
(65th
W
Ave
to
Adams
Rd)
Asphalt
Overlay
&
Add
Bike
Lane













1,200,000


25

Sand
Springs

OK

Streets/Roads

Wekiwa
Rd
(129th
W
Ave
to
177th
W
Ave)
Asphalt
Overlay,
Restripe














500,000


25

Sand
Springs

OK

Water

Add
North
Woods
Chlorina3on
Sta3on














125,000


3

Sand
Springs

OK

Water

Sand
Creek
Lagoon
Improvements
(Add
Aerators)














500,000


4

Sand
Springs

OK

Water

Hwy
97
12
&
16‐inch
Water
Main
(Oak
Ridge
Drive
to
North
Woods
Tank












1,400,000


10

Sand
Springs

OK

Water

Wastewater
Lib
Sta3ons‐
Upgrade
3
to
meet
ODEQ/EPA
Regula3ons














345,000


15

Sand
Springs

OK

Water

Water
Storage
Tank
Rehabilita3on
(6
Tanks)














950,000


36

Sand
Springs

OK

Water

Wastewater
Collec3on
Line
Replacements
(
8
Loca3ons)














518,000


48

Sand
Springs

OK

Water

Replace
2‐inch
Water
Mains
with
6
or
8‐inch
Mains
(
11
Loca3ons)












1,474,000


66

Sapulpa

OK

Water

Construct
Johnson
and
Johannes
Relief
Sewer
Line
to
comply
with
State
and
Federal
Regula3ons












2,800,000


15

Sapulpa

OK

Water

Replace
2MG
Water
Storage
Tank
at
West
Pump
sta3on
to
assure
con3nued
water
supply
and
delivery












3,000,000


20

Tulsa

OK

Airport












1,700,000


10

Tulsa

OK

Airport












1,750,000


11

Tulsa

OK

Airport












2,250,000


13

Tulsa

OK

Amtrak

Rehabilitate
Airfield
Pavements
‐
Jones
Riverside
‐
Project
will
rehabilitate
a
variety
of
taxiways
and
taxilanes
 throughout
the
airport
including
Taxiway
Zulu
that
serves
Runway
1R/19L;
Taxiway
Bravo
and
Taxilanes
JJ,
KK,
 LL,
MM,
and
NN
that
serve
the
No Extend
Taxilane
November‐Alpha
‐Project
constructs
approximately
940
feet
of
taxilane
into
the
North
 Development
Area.

It
includes
earthwork,
concrete
paving
and
minor
drainage
improvements.
This
project
is
 currently
adver3sing
for
bids.

Bid
opening
is Airport
Terminal
Building
Roadway
Reconstruc3on
‐
The
project
will
repair
and
upgrade
the
Terminal
Building
 Roadway
at
the
Tulsa
Interna3onal
Airport.
Por3ons
of
the
roadway
system
that
provides
access
to
the
 Terminal
Building
are
in
need
of
replacemen Amtrak
Feasibility
Study

Tulsa

OK

CDBG

Tulsa

OK

Tulsa

OK

Tulsa Tulsa










16,000,000
 177.8 200












2,000,000















250,000


1

North
Tulsa
Specialty
Clinic










10,000,000


80

CDBG

Phase
II
Cancer
Center
Satellite
and
Imaging
Center










10,000,000


80

CDBG

Electronic
Health
Record
Development










15,000,000


100

OK

CDBG

Federally
Qualified
Primary
Care
Clinic












5,000,000


100

OK

CDBG

North
Tulsa
Regional
Wellness
Center












5,000,000


100

Tulsa

OK

CDBG

Mar3n
Regional
Library
Expansion












8,900,000


167

Tulsa

OK

CDBG

Indigent
care
regional
medical
center
facility
expansion
and
renova3on
(providing
enhanced
services
to
 underserved
and
at
risk
popula3ons)










30,000,000


200

City

State

Program

Tulsa

OK

CDBG

Regional
Medical
Informa3cs
Network,
Data
Warehouse
and
Electronic
Health
Records

Project
Descrip3on

Funding
Required Jobs 








25,000,000
 250

Tulsa

OK

Energy

Energy
Efficient
Facili3es
Improvements












1,600,000


9

Tulsa

OK

Energy

Energy
Efficient
Public
Housing
Infrastructure
Improvements












1,680,000


10

Tulsa

OK

Energy












2,080,000


12

Tulsa

OK

Public
Safety

Compressed
natural
Gas
(CNG)
Fleet
Fueling
Infrastructure
Expansion‐Expand
the
City`s
CNG
infrastructure
to
 fuel
the
growing
CNG
fleet
and
provide
for
the
conversion
of
20
light
duty
vehicles. Railroad
Crossings
‐
At
Grade
Safety
Improvements
‐
Union
Pacific
rail
line
from
1st
Street
to
Peoria
Ave.













5,000,000


18

Tulsa

OK

Public
Safety

Police
Public
Safety
Facility
Improvements












5,240,000


30

Tulsa

OK

Public
Safety










55,000,000


100

Tulsa

OK

Public
Safety

Regional
Training
Center
‐
A
regional
fire
training
center
to
provide
fire
and
homeland
security
training
for
Tulsa
 and
surrounding
communi3es.

 Digital
Infrastructure
Conduit
Expansion










70,000,000


312

Tulsa

OK

Schools

Early
Childhood
Educa3on
Centers
‐
construct
ten
educa3on
centers
to
serve
at
risk
popula3on.








100,000,000


250

Tulsa

OK

Streets/Roads

Boulder
Avenue
Bridge‐
Design
&
Construc3on












9,000,000


72

Tulsa

OK

Streets/Roads

Port
Road
Extension
‐
Yale
Avenue
to
Sheridan
Road










25,200,000


150

Tulsa

OK

Streets/Roads

Gilcrease
West
‐
Phase
1
‐
41st
West
Avenue
to
Tisdale










61,000,000


366

Tulsa

OK

Streets/Roads

Gilcrease
West
Arkansas
River
Bridge
‐
Charles
Page
Blvd
to
West
21st
Street










80,000,000


480

Tulsa

OK

Streets/Roads








200,731,000


1200

Tulsa

OK

Transit














940,000


9

Tulsa

OK

Transit

Tulsa

OK

Transit

Roadway
Improvements‐Improve
74
roadway
segments
thru
pavement
rehabilita3on
and
lane
widening
to
 reduce
conges3on,
and
improve
public
safety. Sidewalk
Infrastructure
Improvements‐Construct
5
sidewalk
projects
that
improve
pedestrian
access
to
transit
 connec3ons. Transit
System
Improvements
‐
ADA
compliant
passenger
shelters,
hybrid
lib
vans,
and
hybrid
transit
coaches
 for
underserved
areas
and
popula3on Tulsa
Regional
Urban
Rail
Infrastructure


Tulsa

OK

Water

Tulsa

OK

Water

Tulsa

OK

Water

Tulsa

OK

Water

Tulsa

OK

Water

Flood
Control
Infrastructure
Improvements‐Construct
8
stormsewer,
channel,
culvert,
and
bridge
projects
to
 improve
public
safety
and
reduce
property
damage
associated
with
localized
flood
events. Wasterwater
System
Improvements‐Construct
4
wastewater
collec3on
system
projects
to
eliminate
health
and
 safety
concerns
associated
with
sewage
overflows. Water
System
Infrastructure‐Construct
18
water
distribu3on,
supply,
and
treatment
projects
throughout
the
 City
of
Tulsa
to
improve
the
delivery
of
safe
drinking
water. Deepening
McClellan
Kerr
Naviga3on
Channel
to
12b.
from
9b.
and
add
addi3onal
barge
parking
and
fleet
 areas
to
allow
for
safe
and
efficient
freight
and
barge
traffic
movement. Arkansas
River
Corridor
‐
improve
or
construct
three
low
water
dams
and
associated
sedimenta3on
control


Corvallis

OR

Airport

Runway
extension

Corvallis

OR

CDBG

Seavey/Alexander
Affordable
Housing
Development
infrastrucutre

Corvallis

OR

CDBG

Corvallis

OR

Corvallis










13,250,000


52










41,500,000


225












3,768,000


22












8,900,000


54










20,673,000


120










49,200,000


295










75,000,000


450












3,150,000


59














750,000


13

Detox
facility
for
drug
and
alcohol
services












1,000,000


17

CDBG

Hilltop
Village
19
unit
Affordable
Housing
Development
infrastructure












1,500,000


25

OR

CDBG

Emergency
Shelter/Drop
in
Center
for
homeless
not
eligible
for
exis3ng
services












2,000,000


34

Corvallis

OR

CDBG

South
Corvallis
Combined
Services
facility;
food
bank,
furniture
share,
Headstart,
neighborhood
center












2,000,000


34

Corvallis

OR

Public
Safety

Addi3onal
officers
to
address
public
safety
needs














326,000


4

Corvallis

OR

Streets/Roads

Hwy
34/20
intersec3on
w/
53rd
street
improvements














179,700


8

Corvallis

OR

Streets/Roads

Hwy
99N
four
lane;
overpass
to
Circle
blvd












1,500,000


25

Corvallis

OR

Transit

Transit
opera3ons
center












2,806,500


53

Eugene

OR

Airport
















75,000


5

Eugene

OR

Airport

Surface
Scan
System

‐
Uses
sensors
to
relay
informa3on
concerning
pavement
temperatures
and
details
about
 water/chemical
content
on
our
runways Runway
rehab
project
to
resurface
the
main
runway
at
the
airport












6,000,000


114

Eugene

OR

Amtrak

Eugene
AMTRAK
Sta3on
Site
Improvements
‐
Ligh3ng
and
Paving
Improvements
to
rail
passenger
areas














200,000


3

Eugene

OR

CDBG

Construct
park
picnic
shelter














125,000


1

Eugene

OR

CDBG

Park
pond
concrete
removal
and
riparian
restora3on














150,000


1

Eugene

OR

CDBG

Trail
Renova3on
and
Interpre3ve
Signage














150,000


1

Eugene

OR

CDBG

Trail
Preserva3on
and
Renova3on














200,000


2

Eugene

OR

CDBG

Hult
Center
hea3ng
system
conversion
‐
required
due
to
closure
of
local
steam
u3lity














250,000


3

Eugene

OR

CDBG














500,000


8

Eugene

OR

CDBG














500,000


8

Eugene

OR

CDBG














500,000


8

Eugene

OR

CDBG

Interstate
Bridge
project
to
include
addi3onal
open
space
elements,
par3cularly
trail
enhancements
in
 Willamefe Redevelop
vacant
lot
in
downtown
Eugene
at
10th
and
Charnelton
‐
200,000
square
feet
of
new
construc3on
 to
feature
mix
of
office
and
rental
housing.

Approx.
$500,000
in
public
par3cipa3on
is
needed
for
project.

The
 total
cost
of
project
is
es3mated Redevelop
vacant
lot
in
downtown
Eugene
at
Broadway
and
Willamefe
‐
200,000
square
feet
of
new
 construc3on
to
feature
mix
of
office
and
rental
housing.

Approx.
$500,000
in
public
par3cipa3on
is
needed
for
 project.

 Park
Irriga3on,
Potable
Water
and
Electrical
Supply
Improvements














600,000


9

Eugene

OR

CDBG

Roosevelt
Crossing
housing
complex
‐
new
construc3on
‐
need
funding
to
fill
current
funding
gap














400,000


9

Eugene

OR

CDBG

Renovate
park
ligh3ng
systems














750,000


11

Eugene

OR

CDBG

Priority
1
playground
renova3ons:

large‐scale
play
area
renova3ons














800,000


12

Eugene

OR

CDBG

Design
and
construct
covered
skate
park
in
City
Center
area












1,000,000


16

Eugene

OR

CDBG

Lamb
Building
‐
Low‐Income
Housing
development
‐
35
units












1,000,000


16

Eugene

OR

CDBG

Renovate
park
restrooms
citywide












1,025,000


16

Eugene

OR

CDBG

Trail
Enhancement












1,000,000


16

Eugene

OR

CDBG

Priority
1
park
renova3ons:

large‐scale
park
renova3ons
in
State
Street
Park












1,400,000


22

Eugene

OR

CDBG

Construct
spray
play
facili3es
to
replace
6
wading
pools
closed
due
to
state
rule












1,500,000


23

Eugene

OR

CDBG

Resurface,
reconstruct
or
replace
23
exis3ng
tennis
courts












1,500,000


23

Eugene

OR

CDBG












1,500,000


23

Eugene

OR

Energy

West
Eugene
Environmental
Educa3on
Center
‐
construc3on
of
science
laboratory
and
educa3onal
facili3es
 and
adjacent
infrastructure. Install
solar
hot
water
system
at
Echo
Hollow
Pool
‐
reduce
natural
gas
costs














225,000


3

City

State

Program

Eugene

OR

Energy

Solar
Power
retrofits
for
MWMC
facili3es

Project
Descrip3on

Eugene

OR

Energy

Eugene

OR

Housing

Through
a
collabora3ve
partnership
between
the
City
of
Eugene
(COE)
and
the
Eugene
Water
&
Electric
Board,
 this
program
proposes
to
complete
energy
efficient
retrofits
to
upwards
of
400
units
per
year
using
the
EPA
 Home
Performance
with
ENERGY
STAR
(HPwE Public
Housing
Moderniza3on

Eugene

OR

Housing

Eugene

OR

Public
Safety

Eugene

OR

Public
Safety

Eugene

OR

Streets/Roads

Building
Remodel
‐Low‐Income
Housing
development
‐
replace
failing
founda3on
at
60
unit
housing
project
 and
New
stairwells
&
balconies,
new
roofs
and
a
remodel
of
the
laundry
rooms
 (stairwells
&
balconies
are
a
priority)
at
another
67
unit
low‐income
pr Emergency
Command
Training
Center
‐Build
and
equip
an
emergency
center
with
the
most
up‐to‐date
 technology
to
replicate
incident
scenarios
and
provide
a
realis3c
experience
that
will
train
incident
 commanders
and
team
leaders. Police
Patrol
Building
‐It
would
be
the
opera3onal
base
for
approximately
120
patrol
officers,
20
sergeants,
6
 lieutenants,
and
one
captain.

The
facility
would
include
office
space
(for
command,
TEU
and
MCI),
locker
 rooms,
briefing
rooms,
a
command
center Accessible
Pedestrian
Signals

Eugene

OR

Streets/Roads

Eugene

OR

Eugene

Funding
Required 














50,000


Jobs 3












3,800,000


60














900,000


14












1,850,000


31












1,500,000


24










24,000,000


384














100,000


1

ADA
Curb
Ramps














100,000


2

Streets/Roads

Fox
Hollow
At
Amazon
Channel
Enhancements
‐
Improving
stormwater
quality














361,000


7

OR

Streets/Roads

Traffic
Signal
Improvements
‐
Safety
and
Capacity














400,000


7

Eugene

OR

Streets/Roads

Elimina3ng
drywells
and
improving
stormwater
conveyance














500,000


9

Eugene

OR

Streets/Roads

Ligh3ng
of
an
exis3ng
mul3‐use
path














571,000


10

Eugene

OR

Streets/Roads

New
mulit‐use
path














993,000


18

Eugene

OR

Streets/Roads

Mul3‐use
path
over
Delta
Highway












2,500,000


47

Eugene

OR

Streets/Roads

Street
Improvements
‐
Preserva3on
&
Upgrade
to
Urban
Standards












3,875,000


73

Eugene

OR

Streets/Roads












4,500,000


85

Eugene

OR

Streets/Roads

Replace
bridges
over
Amazon
Creek
at
Chambers,
Garfield,
City
View,
and
Bailey
Hill.
(per
concepts
in
Metro
 Waterways
Study)
to
eliminate
conveyance
constric3on
points
and
improve
ped/bicycle
underpasses Bike/Ped
Improvements












9,203,000


174

Eugene

OR

Streets/Roads

Pavement
preserva3on










36,819,000


676

Eugene

OR

Transit














200,000


4

Eugene

OR

Water

Eugene
Rail
Depot
Phase
2,
Passenger
&
Site
Improvements
‐
to
restore
elements
removed
from
project
due
to
 funding
limita3ons Beneficial
reuse
site
crop
analysis
and
irriga3on
assessment














200,000


3

Eugene

OR

Water

Greenway/greenspace
water
reuse
irriga3on
assessment














250,000


3

Eugene

OR

Water

Recycled
water
market
study














250,000


3

Eugene

OR

Water

Confluence
Island
Floodplain/Channel
Restora3on














300,000


4

Eugene

OR

Water

Confluence
Island
Hydrologic
Study














300,000


4

Eugene

OR

Water

Recycled
water
community
implementa3on
study/planning














300,000


4

Eugene

OR

Water

Water
Main
Line
Extension
















50,000


5

Eugene

OR

Water

Replacement
of
perimeter
fence
and
security
upgrades














500,000


8

Eugene

OR

Water

Resource
Management
‐
Struvite
Pelle3za3on
Inves3ga3on/Assessment/Design














800,000


12

Eugene

OR

Water

Community
Sewers
‐Providing
direct
wastewater
connec3ons












1,000,000


19

Eugene

OR

Water

Enhance
SIW
for
reclaimed
water
use
or
biofuel
produc3on












1,000,000


19

Eugene

OR

Water

lagoon
upgrade
‐
stormwater
system,
recycled
water,
etc.












1,000,000


19

Eugene

OR

Water

Upgrade
to
exis3ng
recycled
water
force
main












1,500,000


28

Eugene

OR

Water

Chemically‐Enhanced
Primary
Treatment












2,000,000


32

Eugene

OR

Water

Sanitary
Force
Main
Inves3ga3on,
inspec3on,
and
maintenance/upgrade












2,500,000


40

Eugene

OR

Water

Biocycle
Farm
Irriga3on
Assessment/Design
and
Upgrade












3,000,000


48

Eugene

OR

Water

Biosolids
Drying
Bed
Replacement












3,000,000


48

Eugene

OR

Water

Water
pollu3on
Control
Facility
‐

lagoon
upgrade
‐
cleanup
and
lining












4,000,000


64

Eugene

OR

Water

Sludge
Thickening
Facility












4,500,000


72

Eugene

OR

Water

Wastewater
System
Rehabilita3on












4,000,000


76

Eugene

OR

Water

Private
Lateral
Rehabilita3on
Program












5,000,000


80

Eugene

OR

Water

Resource
management
‐
canoe
canal
mul3‐objec3ve
improvements












5,000,000


80

Eugene

OR

Water

Sodium
Hypochlorite
conversion












5,000,000


80

Eugene

OR

Water












5,500,000


88

Eugene

OR

Water

Complete
Delta
Ponds
Enhancement
Project
(culvert
under
Goodpasture
Island
Road
and
Delta
Highway,
finish
 riparian
benches,
plant
benches,
trails,
signage,
parking
lot) Biogas
Co‐genera3on
enhancement












6,000,000


96

Eugene

OR

Water

Mesophilic
Sludge
Digester












9,000,000


144

Eugene

OR

Water

Sludge
Lagoon
Reline
‐
all
phases










10,000,000


160

Eugene

OR

Water

Aera3on
Basin
Upgrade
‐
Phase
II










11,000,000


176

Eugene

OR

Water

Odorous
Air
Project
‐
all
phases










13,000,000


208

Eugene

OR

Water

Amazon
Creek
bank
stabiliza3on:










15,000,000


240

Eugene

OR

Water

Ter3ary
filtra3on
facility
‐
all
phases










28,000,000


448

Gresham

OR

CDBG












3,750,000


104

Gresham

OR

CDBG

Kane
Drive
‐
restore
improvement
elements,
stormwater
system
replacement,
transporta3on
improvement
 elements Underground
Injec3on
Control
Systems
Improvements












5,000,000


139

Gresham

OR

CDBG










18,700,000


520

Gresham

OR

Streets/Roads

Industrial
Land
Access
Improvements
‐
improve
access
to
industrial
areas
and
increase
capacity
for
new
 industrial
development Pedestrian
mobility/capacity
improvements
‐
infill
missing
sidewalk,
install
crosswalk
signaliza3on.












2,500,000


70

Gresham

OR

Streets/Roads












2,500,000


70

Gresham

OR

Streets/Roads

Traffic
Signal
Improvments
‐
rebuild
falling
span‐wire
signals,
replace
outdated
signal
controllers,
replace
 lenses,
etc. Contract
Pavement
Preserva3on
for
iden3fied
deferred
pavement
maintenance










20,000,000


556

Gresham

OR

Water

242
Ave.
Water
Line
Upgrade,
Glisan
to
Stark












1,500,000


42

Gresham

OR

Water

Glisan
Water
Line
Upgrade
‐
new
water
line
to
serve
adjacent
industrial
land
and
development.












2,800,000


78

Gresham

OR

Water

Johnson
Creek
Watershed
Restora3on
‐
flood
protec3on
and
habitat
restora3on.

Authorized
in
WRDA.












5,000,000


139

City

State

Program

Gresham

OR

Water

Lake
Oswego

OR

Water

Ontario

OR

Streets/Roads

Wastewater
Treatment
Plan
Secondary
Clarifier
‐
Design
complete;
necessary
to
accomodate
growth
and
 ensure
water
quality
compliance. Replacement
of
the
backbone
of
the
City's
sewer
system
in
Oswego
Lake
to
prevent
overflows,
ensure
ongoing
 sewer
service
by
making
it
seismically
stable
and
address
an
Oregon
DEQ
Mutual
Agreement
and
Order
to
 begin
the
project
at
a
3me
certain.

The
proj SE
5th
Ave.
‐
I‐84
to
S.
East
Lane.

Upgrade
to
urban
minor
arterial
with
pedestrian/bicycle
improvements.

Project
Descrip3on

Ontario

OR

Streets/Roads

Ontario

OR

Ontario

Funding
Required

Jobs










13,000,000


361










80,000,000


700














650,000


65

SW
Park
Blvd.
‐
SW
11th
Ave.
to
SW
10th
Ave.

New
minor
collector
with
pedestrian/bicycle
improvements.














675,000


68

Streets/Roads

NW
Park
Blvd.
‐
N
Oregon
St
to
Malheur
Dr
New
urban
collector
with
pedestrian/bicycle
facili3es.














700,000


70

OR

Streets/Roads

SE
5th
Ave.
‐
SE
5th
St.
to
I‐84.

Upgrade
to
major
collector
with
pedestrian/bicycle
improvements.














700,000


70

Ontario

OR

Streets/Roads














850,000


85

Ontario

OR

Streets/Roads

N.
Oregon
St.
‐
N.
Bypass
to
1/4
north
of
N.
Fortner
St.
Relocate
&
rebuild
with
pedestrian/bicycle
 improvements
to
connect
with
N.
Bypass
at
NW
20th
Ave. NW
Park
Blvd
‐
Malheur
Dr
to
NW
4th
Ave.
Upgrade
to
urban
collector
with
pedestrian/bicycle
improvements.














862,000


86

Ontario

OR

Streets/Roads














862,000


86

Ontario

OR

Streets/Roads












1,500,000


140

Ontario

OR

Streets/Roads












4,798,000


480

Ontario

OR

Water












1,082,800


109

Ontario

OR

Water












1,234,700


124

Ontario

OR

Water












1,394,600


140

Ontario

OR

Water












2,532,000


254

Oregon
City

OR

Amtrak

Pipelines
for
SE
10th
Street
from
McDaniel
Mobile
to
SE
5th
Ave.,
SE
2nd
Ave.
from
SE
4th
St.
to
SE
1st
St.,
 Northwest
area
improvements,
and
SE
5th
Ave.
improvements.

Per
2008
Facili3es
Planning
Study. Pipelines
for
SW
4th
and
S.
Dorian
Dr.,
Washington
Ave.
and
Yturri
Beltline,
Malheur
Drive
and
Park
Blvd.,
S.
 Oregon
Street
and
13th
Ave.

Per
2008
Facili3es
Planning
Study. Wastewater
Improvements
to
include;
parallel
24"
FM
to
WWTP,
Beltway
pipeline,
improvements
near
NW
8th
 Ave.
lib
sta3on,
upgrade
Tapadera
lib
sta3on,
and
relocate
West
Idaho
lib
sta3on.

Per
2008
Facili3es
Planning
 Study. 3mg
storage
reservoir,
booster
sta3on
flow
meter
and
SCADA,
standby
generator
on
3,000
gpm
pump,
and
 replace
check
valves
with
pipe
spools.

Per
2008
Facility
Planning
Study. Oregon
City
Amtrak
Sta3on
improvements
(building
and
parking
lot)












1,500,000


32

Oregon
City

OR

Streets/Roads

John
McLoughlin
Historic
WPA
Promenade
Safety
Improvements












1,000,000


8

Oregon
City

OR

Streets/Roads

Division
Street
Pavement
Rehabilita3on












1,500,000


46

Oregon
City

OR

Streets/Roads

Beavercreek/Molalla
Improvements














500,000


48

Oregon
City

OR

Streets/Roads

Molalla/Warner
Milne
Realignment












2,500,000


50

Oregon
City

OR

Streets/Roads

Molalla
Avenue
Roundabout












4,000,000


56

Oregon
City

OR

Streets/Roads

OR
Highway
213/Redland
Road












8,000,000


800

Oregon
City

OR

Streets/Roads

I‐205/OR
Highway
213
Interchange










15,000,000


1927

Oregon
City

OR

Transit

Purchase
three
trolleys












1,000,000


24

Oregon
City

OR

Transit

Trolley
Barn












4,500,000


36

Portland

OR

CDBG










86,000,000


1118

Portland

OR

Streets/Roads

Portland
Parks
and
Trails
Construc3on:

Construc3on
of
a
community
center,
the
development
of
several
parks,
 and
10
miles
of
mul3‐modal
trails Portland
Bridge
Repair:
repair
and
reconstruc3on










22,000,000


312

Portland

OR

Streets/Roads










65,000,000


959

Portland

OR

Transit

Portland
Arterial
Paving,
Improvement,
and
Safety:
improving
arterials
in
the
City;
includes
paving,
safety
 improvements,
conges3on
relief,
and
bicycle
boulevards Portland
Streetcar:
the
extension
of
the
Portland
streetcar
loop
across
the
river
to
OMSI










75,000,000


600

Portland

OR

Water










52,000,000


724

Salem

OR

Airport

Sewer
Capacity
Reconstruc3on:
the
expansion
of
the
Columbia
Wastewater
Plant
and
the
reconstruc3on
of
a
 number
of
key
facili3es
in
the
citywide
system South
Hanger
Area
improvements,
includes
add3onal
taxi
lane,
more
hanger
areas,
and
security
fencing.














400,000


20

Salem

OR

CDBG

Replace
structurally
and
opera3onally
deficient
opera3ons
service
center
for
public
works
func3ons.











14,500,000


320

Salem

OR

Housing

Replace
flooring
in
family
units
at
6
sites.














237,000


6

Salem

OR

Housing














320,000


6

Salem

OR

Housing

Replace
old
deteriorated
doors,
including
hardware
and
locks,
with
new
energy
efficient
ones
at
6
low
income
 family
sites. Upgrade
exis3ng
playgrounds
for
ADA
and
safety
compliance
at
4
low
income
family
sites.

Salem

OR

Housing

Energy
efficiency
upgrades
at
all
public
housing
sites.

Salem

OR

Housing

Salem

OR

Streets/Roads

Salem

OR

Salem

SE
2nd
St.
‐
SE
9th
Ave.
to
Butler
Blvd.

Upgrade
to
urban
major
collector
with
pedestrian/bicycle
 improvements. NW
4th
Ave.
roadway
improvements
from
Tori
Street
to
400'
West
of
Hwy
201.

To
include
water
and
sewer
 upgrades. SE
5th
Ave.
‐
Bridge
over
I‐84.

Widen
bridge
with
pedestrian/bicycle
improvements.














140,000


6












1,535,000


11

Replace
aging
and
leaking
roof
systems
at
3
family
sites.














240,000


15

Pavement
restora3on
and
resurfacing
of
Airport
Rd.,
SE,
State
St.
to
Mission
St.














470,000


8

Streets/Roads

Pavement
restora3on
and
resurfacing
of
Kale
St.
NE,
Portland
Rd.
to
49th
Ave.














440,000


8

OR

Streets/Roads

Pavement
restora3on
and
resurfacing
of
Chemewa
Rd.,
NE
to
Portland
Rd.














590,000


11

Salem

OR

Streets/Roads

Pavement
restora3on
and
resurfacing
of
Hyacinth
St.,
BNRR
to
Portland
Rd.














680,000


12

Salem

OR

Streets/Roads

Pavement
restora3on
and
resurfacing
of
Turner
Rd.
SE,
Boone
Rd.
to
SE
City
limits.














690,000


13

Salem

OR

Streets/Roads

Add
leb
turn
lane
and
signaliza3on
to
Kuebler
Blvd.














798,000


14

Salem

OR

Streets/Roads

Pavement
restora3on
and
resurfacing
of
25th
St.,
State
St.
to
Mission
St.














790,000


14

Salem

OR

Streets/Roads

Bellevue
St.
Re‐alignment














877,390


16

Salem

OR

Streets/Roads

Pavement
restora3on
and
resurfacing
of
River
Rd.
South,
Owens
St.
to
Croisan
Creek
Rd.














990,000


18

Salem

OR

Streets/Roads

Construc3on
of
a
half
street
improvement
to
Strong
Rd.,
SE












1,950,000


34

Salem

OR

Streets/Roads

Access
and
pedestrian
improvements
along
Pringle
Creek












2,292,920


41

Salem

OR

Streets/Roads

Union
St.
Railroad
Bridge,
Phase
ll












3,000,000


54

Salem

OR

Streets/Roads

South
Airport
Industrial
Park
Phase
ll,
Infrastructure
Improvements












4,600,000


83

Salem

OR

Streets/Roads

South
Airport
Industrial
Park
Phase
1B,
Infrastructure
Improvements












6,080,000


108

Salem

OR

Streets/Roads

Street
and
sidewalk
improvments
on
Salem
Industrial
Drive
Extension,
Anunsen
St.
to
Hyacinth
St.












7,700,000


139

Salem

OR

Streets/Roads












7,800,000


140

Salem

OR

Streets/Roads










18,700,000


337

Salem

OR

Streets/Roads

Road
and
infrastructure
improvements
to
Gaffin
and
Cordon
Roads
including
widening,
drainage,
curbage,
 gufers,
signals
and
turn
lanes.

Make
other
infrastructure
improvements
necessary
to
serve
the
Salem
 Renewable
Energy
&
Technology
Park. Provide
road
improvements
to
McGhilchrist
St.
with
turn
lanes,
bike
lanes,
signals,
sidewalks,
and
stormwater
 infrastructure,
which
in
turn
will
help
lure
businesses
to
this
underu3lized
industrial
area. Full
street
improvement
and
undergrounding
of
u3li3es
on
Portland
Rd.,
Phase
ll.










22,500,000


405

Salem

OR

Water

Reed
Ln/Barnes
Rd.
Stormwater
Conveyance
System
Improvements














400,000


6

City

State

Program

Salem

OR

Water

Stoneway
Stormwater
Conveyance
System
Improvements

Project
Descrip3on

Salem

OR

Water

Install
watermain
for
adequate
capacity
at
Fabry
Rd.

Salem

OR

Water

Salem

OR

Salem

OR

Salem

Funding
Required 












300,000


Jobs 6














600,000


8

Center
St./Greenbriar
Gravity
Sewer












1,250,000


12

Water

Replace
failing
18"
watermain
at
Liberty
St.












1,750,000


17

Water

Cordon
Rd.
Gravity
Sewer












1,657,000


18

OR

Water

West
Marion
Wastewater
Collec3on
Improvements












1,750,000


18

Salem

OR

Water

Geren
Island
Sand
Filter
Replacement












2,600,000


24

Salem

OR

Water

Install
parallel
main
for
adequate
capacity
at
Boone
Rd.












3,500,000


34

Salem

OR

Water

Safer/Hayesville
Gravity
Sewer












4,400,000


38

Salem

OR

Water












9,000,000


162

Allentown

PA

CDBG

Build
a
new
reservoir,
water
mains,
and
related
pipework
to
serve
state
and
county
correc3onal
facili3es,
Mill
 Creek
Corporate
Center,
and
SE
Salem
residents. Equipment
for
Recycling
Center:

Trommel
Screener
Tub
Grinder,
Trash
Transfer
to
Trailer
Compactor
Unit












1,120,000


1

Allentown

PA

CDBG

Roosevelt/
Old
Fairgrounds
Improvements














200,000


1

Allentown

PA

CDBG

Bucke
Boyle
Bathhouse
Renova3on














500,000


2

Allentown

PA

CDBG

Playground
Improvements
&
Replacement
including
Safety
Program














277,000


3

Allentown

PA

CDBG














700,000


5

Allentown

PA

CDBG

City
Hall
Improvements:

 

Elevator
Replacement,
 

Replacement
of
Lights
and
Trolley
around
City
Hall
Perimeter,
 
City
Hall
HVAC
System Roof
Replacements
at
various
City
Buildings
(Ceiling
at
Filter
Plant)














475,000


5

Allentown

PA

CDBG

Site
Prepara3on
&
Constuc3on
of
Transer
Pit
for
Recyling
&
Solid
Waste














750,000


6

Allentown

PA

CDBG












1,990,000


13

Allentown

PA

CDBG

Trail
Development
&
Improvement:
East
Side‐
Lehigh
River,
Incinerator
Site,
Barber's
Quarry
Branch,
Canal
Park
 Tow
Path
 Street
Trees
and
Urban
Forest
Ini3a3ve












2,500,000


15

Allentown

PA

CDBG

Allentown
Cemetery
Improvements












1,500,000


17

Allentown

PA

CDBG

Union
Bap3st
Community
Center,
6th
&
Chew
Streets












4,000,000


30

Allentown

PA

CDBG

Sacred
Heart
Neighborhood
Public
Improvements












5,000,000


47

Allentown

PA

CDBG












6,568,000


50

Allentown

PA

CDBG

Allentown

PA

CDBG

General
Park
Improvments:
Field
Renova3ons,
Drainage,
Parking
Lot,
&
Restrooms.

Parks
including,
Cedar
 Beach/Parkway,Trexler
&
Lehigh
Parkway
(Wall
Repairs),
Keck,
Fellowship
East,
Nice
13,
East
Side
Reservoir,
 Incenerator
Site,
Franklin,
Jordan,
Jordan City
Pool
Renova3ons
(Cedar
Beach,
Mack,
Foundtain,
Jordon,
&
Irving)
Renova3ons
to
include:

New
or
 Patching
Floors,
Sandblas3ng,
Ceramic
Tile,
Plastering,
New
Filtra3on
Systems,
New
Vacuuming
Systems,
 Revised
Chemical
Systems,
New
Perimeter
Piping,
 City
of
Allentown
Riverfront
Development
Project

Allentown

PA

CDBG

City
of
Allentown
Conven3on
Center

Allentown

PA

Streets/Roads

Reconstruct
1
(one)
street,
Union
‐
American
Parkway
to
RR
Tracks

Allentown

PA

Streets/Roads

Of
St.
Streetscape
Enhancements














750,000


7

Allentown

PA

Streets/Roads

Front
Street
Streetscape
Enhancements
(Hamilton
to
City
Line)










11,000,000


14

Allentown

PA

Streets/Roads

19th
Street
Streetscape
Ini3a3ve
(Liberty
to
Tilghman)












1,500,000


15

Allentown

PA

Streets/Roads

Hamilton
Street
Electrical
Upgrade












2,500,000


16

Allentown

PA

Streets/Roads

Traffic
Calming
for
Chapel
Ave
&
Parkway
Blvd












2,000,000


20

Allentown

PA

Streets/Roads

West
Park
Streetscape
Ini3a3ve












3,000,000


20

Allentown

PA

Streets/Roads












3,565,000


21

Allentown

PA

Streets/Roads












2,775,000


25

Allentown

PA

Streets/Roads

Rehab
9
(nine)
Concrete
Streets:

Plymouth
‐
Union
to
Columbia;
Arch‐
Parkway
to
Turner;
29th
‐
Parkway
to
 Turner;
Allen
‐
Arch
to
Glenwood;
Walnut
‐
2nd
to
3rd;
Sherman
‐
Union
to
Hanover;
4th
‐
Washingon
to
 Walnut;
Union
‐
4th
to
5th;
and
Harrison
‐
Leh New
Concrete
for
6
(six)
streets:

Chew
‐23rd
to
31st;
Refwal
‐
Green
to
Allen;
Type
‐
14th
to
Mercer;
Hazel
‐
 Chew
to
Gordon; Page
‐
Howard
to
11th;
and
Monroe
‐
5th
to
Williams Old
Allentown
Streetscape
Improvements












5,000,000


40

Allentown

PA

Streets/Roads

8th
Street
Bridge
Enhancements












6,000,000


45

Allentown

PA

Streets/Roads

7th
Street
Enhancements
(Walnut
to
City
Line)












7,500,000


50

Allentown

PA

Streets/Roads












5,090,000


50

Allentown

PA

Streets/Roads

Mill
&
Overlay
5
(five)
streets:

Harrison
‐
S.
Hall
to
S
10th;
Hanover
‐
Bridge
East
to
Irging;
Hamilton
‐

2nd
to
 5th
(part
of
Downtown
Commercial
Corridor):
Mack
‐
Emaus
to
8th
St
Underpass;

and
Plymouth
‐
Union
to
 Hanover Ralumac
Midway
Manor
&
West
Brook
Park
Neighborhoods












5,000,000


50

Allentown

PA

Water

Halstead
Tank
–
Pain3ng
of
Elevated
Storage
Tank














100,000


0

Allentown

PA

Water

Huckleberry
Ridge
Reservoir
–
Installa3on
of
Sodium
Hypochlorite
Generator
for
Reservoir


Allentown Allentown

PA PA

Water Water

Schantz
Flooding
Inves3ga3on
–
Evalua3on
of
Flood
Control
Measures
to
Protect
Schantz
Spring Water
Distribu3on
Replacement
(In
House)
















35,000
 














20,000


0 0














400,000


0

Allentown

PA

Water

Lehigh
River
Flood
Dike
Maintenance
–
Annual
Maintenance
on
Federal
Flood
Control
Project
















250,000


1

Allentown

PA

Water

Security
–
Upgrades
at
the
Wastewater
Plant
to
meet
Federal
Regula3ons
















100,000


1

Allentown

PA

Water

Sludge
Basin
Cleaning
Equipment

Allentown Allentown Allentown

PA PA PA

Water Water Water

Miscellaneous
Drainage
Improvements
 Motor
Control
Replacement
(MCC1)
–
(In
progress)
Replacement
of
Major
Electrical
Equipment
from
the
 Centrifugally
Spun
Cast
Iron
Pipe
Replacement
(In
House)














100,000
 












250,000
 












600,000


1 2 3














400,000


4












5,700,000


62










20,000,000


300










20,000,000


350














750,000


5

City

State

Program

Allentown

PA

Water

Water
Main
Replacement


(Contract
Out)

Project
Descrip3on

Funding
Required

Allentown Allentown Allentown Allentown Allentown Allentown Bethlehem Bethlehem Bethlehem

PA PA PA PA PA PA PA PA PA

Water Water Water Water Water Water CDBG CDBG CDBG

Covers
for
Plate
Seflers Sewer
System
Extension
 Saintary
Flow
Monitoring
Evalua3on
for
Excessive
Inflow
&
Infitlra3on Ozona3on
Equipment
for
Lehigh
River
Intake Removal
of
Inflow
&
Infiltra3on Automa3c
Meter
Reading
Program Construc3on
of
restrooms
at
City
Line
Lifle
League
field Restore
and
rehabilitate
1850
Historic
Stock
House
into
Visitors
Center Develop
400
car
space
parking
garage
adjacent
to
Historic
Fla3ron
building












6,000,000


75

Bethlehem

PA

CDBG

Develop
300
car
space
parking
garage
on
South
Main
Street












6,500,000


100

Bethlehem

PA

CDBG

1000
car
space
garage
and
mul3‐modal
transporta3on
center
for
Bethlehem
Works










25,000,000


150

Bethlehem

PA

Energy












1,000,000


Bethlehem

PA

Energy

Establishment
of
energy
efficiency
grant
fund
to
assist
homeowners
in
energy
efficiency
renova3ons
to
their
 homes Install
Greenroof
on
City
Hall
‐
Building
A

Bethlehem

PA

Energy

Upgrade
mechanical
systems
in
City
Hall
complex














210,000


8

Bethlehem

PA

Energy

Installa3on
of
solar
panels
at
City
Hall
complex














200,000


12

Bethlehem

PA

Energy

Window/door
replacement
at
City
Hall
complex
















80,000


18

Bethlehem

PA

Energy












4,000,000


150

Bethlehem

PA

Public
Safety

Public/Private
partnership
to
construct
hydrogen
fueling
infrastructure
on
former
Bethlehem
Steel
brownfield
 site Install
emergency
generators
at
all
Fire
Sta3ons














100,000


4

Bethlehem

PA

Public
Safety

Upgrade
of
Monocacy
Complex
power
system/infrastructure














100,000


4

Bethlehem

PA

Public
Safety

Resurface
Yosko
Park
and
Sand
Island
basketball
courts














120,000


6

Bethlehem

PA

Public
Safety

Renova3ons
to
Daughters
of
the
American
Revolu3on
House














120,000


8

Bethlehem

PA

Public
Safety

Replacement
of
garage
floor
and
access
ramps
‐
City
Hall














210,000


8

Bethlehem

PA

Public
Safety

Resurface
Westside
Park
tennis
courts
















65,000


8

Bethlehem

PA

Public
Safety

Saucon
Park‐Saints
field
eleva3on
and
ligh3ng














175,000


10

Bethlehem

PA

Public
Safety

Various
improvements
to
Municipal
Service
Center
Garage
















70,000


10

Bethlehem

PA

Public
Safety

Public
pool
repairs/improvements














300,000


12

Bethlehem

PA

Public
Safety

Construct
new
EMS
facility
at
Eaton
Avenue














700,000


15

Bethlehem

PA

Public
Safety

Redesign
of
Friendship,
Fairview,
and
Higbee
Parks














600,000


15

Bethlehem

PA

Public
Safety

Construct
new
Firehouse
replacing
Lincoln
Fire
Sta3on












2,450,000


20

Bethlehem

PA

Public
Safety

Develop
Sand
Island
West














350,000


20

Bethlehem

PA

Public
Safety

Firearms
Range
Development












1,224,113


25

Bethlehem

PA

Public
Safety

Public
Safety
training
facility
with
training
tower
and
EVOC
course
for
Police,
Fire
and
EMS












3,000,000


25

Bethlehem

PA

Public
Safety

Construct
Skate
Park












1,500,000


30

Bethlehem

PA

Public
Safety

Purchase
and
renova3on
of
building
for
Public
Safety
annex












3,500,000


50

Bethlehem

PA

Public
Safety

Develop
Greenway
from
New
Street
to
Lynn
Avenue












3,200,000


60

Bethlehem

PA

Streets/Roads

Streets
Bureau
storage
facility














100,000


20

Bethlehem

PA

Streets/Roads

Traffic
Bureau
truck
storage
facility
















90,000


20

Bethlehem

PA

Streets/Roads

Perry
Street
Improvements














115,000


30

Bethlehem

PA

Streets/Roads

City
Hall
complex
laybys,
Phase
III














135,000


35

Bethlehem

PA

Streets/Roads

College
Drive
(Apple
Street)
Improvements














132,000


35

Bethlehem

PA

Streets/Roads

West
Garrison
Street
reconstruc3on














130,000


35

Bethlehem

PA

Streets/Roads

Greenmeadow
Drive
storm
sewer
improvements














145,000


40

Bethlehem

PA

Streets/Roads

Linden
Street
storm
sewer
improvements














200,000


50

Bethlehem

PA

Streets/Roads

West
Goepp
Street
storm
sewer
improvements














250,000


65

Bethlehem

PA

Streets/Roads

Repairs
to
10
bridges
in
the
City














300,000


80

Bethlehem

PA

Streets/Roads

South
Mountain
Drive
resurfacing
and
reconstruc3on














340,000


80

Bethlehem

PA

Streets/Roads

East
Fibh
Street
reconstruc3on














400,000


100

Bethlehem

PA

Streets/Roads

Municipal
garage
building
addi3on














500,000


100

Bethlehem

PA

Streets/Roads

Johnston
Drive
swale
improvements












1,000,000


170

Bethlehem

PA

Streets/Roads












1,220,000


200

Bethlehem

PA

Streets/Roads

Carlton
Avenue
improvements
to
curb,
sidewalk,
overlay
streets,
remove
and
plant
new
trees,
renew
water
 and
sewer
mains. Engineering
and
replacement
of
High
Street
bridge












1,200,000


200

Bethlehem

PA

Streets/Roads












2,500,000


400

Bethlehem

PA

Water














400,000


10

Bethlehem

PA

Water

One‐Way
Pair
program
conver3ng
major
gateway
streets
to
one‐way,
complete
signage,
pavement
markings,
 pedestrian
safety
improvements
and
addi3onal
on‐street
parking Diversion
manhole
upgrades
at
Waste
Water
Treatment
Plant
to
alleviate
hydraulic
grade
line
issues
in
 collec3on
system
and
sanity
sewer
overflows Security
improvements
for
water
distribu3on
system














300,000


13

Bethlehem

PA

Water

Waste
Water
Distribu3on
System
renewal
to
replace
aged
water
mains












1,000,000


13

Bethlehem

PA

Water

Extension
of
City‐owned
infrastructure
into
Bethlehem
Township
for
service












6,600,000


14

Bethlehem

PA

Water

Backwash
system
improvement
at
water
filtra3on
plant












1,800,000


16

Bethlehem

PA

Water

Oxidant
Delivery
System
to
combat
biofilm
in
raw
water
transmission
mains












1,800,000


16

Bethlehem

PA

Water

Waste
Water
Collec3on
System
renewal/I&I
reduc3on












1,500,000


17

Bethlehem

PA

Water

Phase
1
upgrades
and
expansion
to
Waste
Water
Treatment
Plant










10,330,000


50

Cheltenham,
PA

PA

Energy

Upgrade
all
traffic
signals
within
municipality
to
LED's
to
reduce
energy
costs.
















50,000


6

Cheltenham,
PA

PA

Streets/Roads














600,000


10

Cheltenham,
PA

PA

Streets/Roads

Resurfacing
and
repaving
of
various
streets
within
local
roadway
network
throughout
municipality
to
provide
 safety
and
enhance
mobility.

 Streetscape
Enhancements
and
Traffic
Calming
Improvement
Project
for
the
Elkins
Park
East
Commercial
 District
to
provide
ADA
accessibility
and
safe
intermodal
connec3vity
along
local
road
network
of
High
School
 Road,
Montgomery,
Harrison
&
Park
Avenues.












1,828,850


20














710,000
 










1,500,000
 












790,000
 












800,000
 










3,500,000
 










1,500,000
 










6,000,000
 














85,000
 










2,500,000

















90,000


Jobs 6 7 7 8 15 15 60 6 50

8

City

State

Program

Cheltenham,
PA

PA

Streets/Roads

Cheltenham,
PA

PA

Water

Harrisburg

PA

Airport

Harrisburg

PA

Amtrak

Harrisburg

PA

CDBG

Streetscape
Enhancements
and
Traffic
Calming
Improvements,
Phase
III,
(Springhouse
Ln
to
Church
Rd)
in
 Glenside
Commercial
District
to
provide
ADA
accessibility
and
safe
intermodal
connectability
between
local
 University
and
regional
rail
sta3on.
 Sanitary
Wastewater
Infrastructure
Repairs,
Phase
II,
including
repairs,
replacement
and
reloca3on
of
old
 sanitary
wastewater
lines
as
part
of
a
consent
decree
order
by
the
Pennsylvania
DEP
along
the
Cheltenham
 municipal
interceptor. Obstruc3on
Removal
Work
at
Harrisburg
Interna3onal
Airport
(removal
of
vacant
power
plant,
other
out
 buildings) Track
Extension
at
Harrisburg
Transporta3on
Center;
major
security
upgrades
to
center
and
rail
tracks
into
the
 city Energy
conserva3on
retrofits
to
city
and
school
district
buildings

Project
Descrip3on

Funding
Required

Jobs

Harrisburg

PA

CDBG

Construct
and
open
first‐ever
Ex‐Offender
Re‐Entry
and
Job
Training
Center,
including
equipment










15,000,000


75

Harrisburg

PA

CDBG

Build
citywide
Rec
Center
&
Ska3ng
Rink












9,000,000


120

Harrisburg

PA

CDBG

Construc3on
of
Department
of
Public
Works
Building










15,000,000


150

Harrisburg

PA

CDBG

Construc3on
of
Steam
Line
from
Waste‐to‐Energy
Facility
to
Downtown
District
Hea3ng
Plant










17,500,000


150

Harrisburg

PA

CDBG

Reconstruc3on
/repaving
of
75
Streets












7,250,000


150

Harrisburg

PA

CDBG

Eighteen
story
mixed‐used
commercial
center
in
downtown










12,000,000


400

Harrisburg

PA

CDBG










22,750,000


500

Harrisburg

PA

CDBG

Acquisi3on
of
350
Rental
units,
Renova3on
and
Resale
for
Affordable
Housing
to
new
homeowners
of
 moderate
income Construc3on
of
2
downtown
hotels










22,000,000


500

Harrisburg

PA

Energy

Installa3on
of
Solar
Panels
on
city,
school
district
bldgs.,
on
streetlights,
traffic
signals










20,000,000


110

Harrisburg

PA

Energy

Installa3on
of
roobop
wind
turbines
on
public
sites,
including
their
grid
connec3ons

Harrisburg Harrisburg Harrisburg

PA PA PA

Energy Energy Housing

Retrofit
and
Energy
Efficency
Upgrade
to
Waste‐to‐Energy
Plant
(where
steam
and
electricty
are
co‐generated) Energy
conserva3on
retrofit
to
low‐income
homeowner's
homes Energy
conserva3on
retrofit,
security
upgrades
and
building
improvements










14,000,000
 








28,000,000
 








20,000,000


125 125 300










32,000,000


78

Harrisburg

PA

Public
Safety

Vehicles,
radios
and
gear
for
50
new
police
officers












1,150,000


5

Harrisburg

PA

Public
Safety














285,000


6

Harrisburg

PA

Public
Safety












9,500,000


25

Harrisburg

PA

Public
Safety

Hire
Community
Rela3ons
Coordinator
and
5
support
staff
(for
greater
police‐public
interac3on,
crime
watch
 group
support,
public
informa3on
role) Replace
Metro
criminal
informa3on
system
with
state‐of‐the‐art
technology
that
also
accords
inter‐operability
 with
other
agencies) Hire
50
new
police
officers












3,100,000


50

Harrisburg

PA

Schools

Energy
efficiency
retrofit
of
school
buildings,
machinery
and
equipment












8,000,000


50

Harrisburg

PA

Schools

Replacement
of
former
Woodward
School
with
new
pre‐school/elementary
campus










32,000,000


250

Harrisburg

PA

Schools

Construc3on
of
30
Pre‐School
Classrooms
and
15
Reading
Recovery
classrooms










32,000,000


350

Harrisburg

PA

Schools

Renova3on
and
Upgrade
to
William
Penn
School
Campus
(built
1926)










62,000,000


350

Harrisburg

PA

Schools










68,000,000


550

Harrisburg

PA

Schools










70,000,000


550

Harrisburg

PA

Streets/Roads

Construc3on
of
new
voca3onal‐technical
school
campus,
to
be
named
the
21st
Century
Job
Skills
Center,
 including
elementary
and
seondary
classrooms
and
vo‐tech
industry
center Replacement
of
12
roofs
of
exis3ng
schools
and
replacement
of
HVAC,
Plumbing
and
Electrical
systems
of
5
 schools Downtown
Streetscape
Improvement
Project:
Complete
upgrade
and
expansion
of
all
sidewalks,
curbs,
 streetlights,
street
furniture.
Intersec3ons
and
signage
of
central
business
district
(already
designed)










27,500,000


350

Harrisburg

PA

Streets/Roads

Landuse
and
Infrastructure
Study
and
Replacement
of
Water,
Sewer
&
Other
U3lity
Lines
in
Southgate
Project










30,000,000


500

Harrisburg

PA

Streets/Roads










98,000,000


750

Harrisburg

PA

Transit

Build
Transporta3on
Component
of
Southgate
Project
(involves
replacement
roadways,
bridges,
relieves
 conges3on
and
spurs
$3
billion
in
economic
development) Build
Regional
Rail
Stop
at
HBG.
Interna3onal
Airport












2,800,000


35

Harrisburg

PA

Transit

New,
energy‐efficient
bus
stops
with
LED
informa3on
screens












2,000,000


50

Harrisburg

PA

Transit

Purchase
natural‐gas
powered
mass
transit
buses,
including
downtown
trolley
buses












7,000,000


75

Harrisburg

PA

Transit

Improvements
to
bldg.
and
rail
tracks
at
Harrisburg
Transporta3on
Center
(bus
and
rail
center)












9,200,000


150

Harrisburg

PA

Water

Nitrate
Removal
Project
at
Wastewater
Plant,
the
effluent
of
which
flows
into
the
Chesapeake
Bay










62,000,000


250

Harrisburg

PA

Water










90,000,000


850

Lancaster

PA

CDBG

Water
and
Sewer
Line
Replacements,
Upgrades
and
Elimina3on
of
Combined
Stormwater/Wastewater
Lines
 into
seperated
lines Downtown
Streetscape
Improvements












6,000,000


25

Lancaster

PA

CDBG

South
Duke
Street
Improvements












3,000,000


35

Lancaster

PA

CDBG

North
Market
Street
Parking
Garage










11,000,000


50

Lancaster

PA

CDBG

Conestoga
Plaza












6,000,000


75

Lancaster

PA

CDBG

ChurchTowne
Freedom
Center










16,000,000


100

Lancaster

PA

Public
Safety

Six
School
Resource
Police
Officers














400,000


6

Philadelphia

PA

Airport

Airfield
‐
New
Interior
Perimeter
Service
Road












2,000,000


66

Philadelphia

PA

Airport












3,000,000


99

Philadelphia

PA

Airport

Rehabilitate
Taxiways
A
&
L
(PNE)
‐
Pavement
rehabilita3on
will
consist
of
mill
and
overlay,
crack
repairs,
and
 full
depth
pavement
replacement. Airfield
Electrical
Improvements‐
The
airfield
signage,
ligh3ng,
and
cabling
will
be
replaced
and
upgraded.












4,000,000


132

Philadelphia

PA

Airport

Reconstruct
RW
9R/27L
‐
Funds
will
be
used
for
pavement
resurfacing
to
Runway
9R/27L.










15,000,000


495

Philadelphia

PA

Airport










24,000,000


792

Philadelphia

PA

CDBG














500,000


14

Philadelphia

PA

CDBG












2,500,000


29

Philadelphia

PA

CDBG

Reconstruct
D‐E
Apron
‐
Over
one
million
square
feet
of
14‐inch
thick concrete
paving
located
between
Terminals
D
and
E
will
be
replaced.

 old
pavement
surface
has
reached
the
end
of
useful
life
for
safe opera3on
of
aircrab" Bookmobiles: Purchase
and
deployment
of
bookmobiles
in
underserved
communi3es
in
the
city. Engagement
center
for
homeless: Central
intake
loca3on
for
homeless
individuals
and
families
with
feeding
center,
behavioral
health
assessment,
 and
overnight
sleeping
accommoda3ons
while
assessment
and
placement
is
undertaken. Robin
Hood
Dell
East: Reconstruc3on
of
sea3ng,
drainage,
ligh3ng,
stage,
and
other
improvements












5,000,000


56












1,426,697


20












4,000,000


10










14,000,000


250












5,800,000


125












7,000,000


35

City

State

Program

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

CDBG

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Project
Descrip3on Branch
Library
Improvements: Upgrade
of
Facili3es
including
Structural
and
mechanical
Systems 30th
Street
Gateway: Pedestrian
connec3ons,
circula3on
and
parking
 City‐wide
Supermarket
Development:
Aquisi3on,
redevelopment,
and
infrastructure
for
supermarket
 development
in
underserved
areas. The
Mann
Center:
Phase
II
renova3ons
and
construc3on
of
educa3on
center,
concessions,
restroom
facili3es
&
 handicapped
access
area Chinatown
Community
Center:
Construc3on
of
Chinatown
Community
Center Regional
offices
for
human
services: Crea3on
of
local
offices
for
child
welfare
services
including
advocates
and
court
offices Outdoor
Community
Theater: Reconstruc3on
of
important
Community
Theater
Robin
Hood
Dell Capital
improvements
to
health
centers: Physical
improvements
to
8
neighborhood‐based,
community
health
centers.

This
includes
weatheriza3on,
 structural
maintenance,
mechanical
systems
upgrade,
renova3on,
and
upgrading
of
furniture
and
equipment Neighborhood
Health
Center:
 Construc3on
of
neighborhood
health
center
in
underserved
community
in
Philadelphia
with
high
immigrant
 and
uninsured
popula3ons Residen3al
facility: Facility
for
individuals
requiring
skilled
nursing
care
and/or
assistance
with
ac3vi3es
of
daily
living Avenue
of
the
Arts
North:
North
Broad

street
infrastructure
and
Streetscape
Improvements Demoli3on,
Site
Prepara3on,
and
Greening: Citywide
demoli3on
of
vacant
and
blighted
proper3es,
site
prepara3on
and
greening Dilworth
Plaza:
Construc3on,
infrastructure
improvements
and
other
costs
related
to
the
Dilworth
Plaza
 Project. Philadelphia
Zoo: Construc3on,
infrastructure,
and
other
related
costs
for
Children's
Zoo,
Aviary,
Big
Cat
Falls
and
other
exhibits Centennial
District:
Construc3on,
infrastructure
improvements
and
other
costs
related
to
the
Centennial
 District
Project Central
Delaware
Waterfront:
Riverfront
trail,
decking,
finger
piers,
parks,
transit
connec3ons
and
other
 development
along
the
Delaware
River City‐Wide
Transit
Oriented
Development:
Aquisi3on,
redevelopment,
and
infrastructure
for
transit‐
oriented
 development Free
Library:
Renova3on
and
expansion
of

regional
branches Girard
Avenue
Streetscape
Project:
Streetscape
infrastructure
and
transit
improvement
project
from
Delaware
 River
to
33rd
St. Schuylkill
River
Park:
Design,
engineering
and
construc3on
of
trail,
pedestrain
overpass,
decking
and
bridging
st
 Schuylkill
river Commercial
Corrdior
Improvements: Citywide
commercial
corridor
improvements
including
ligh3ng,
street
trees,
signage,
gateways
and
other Hun3ng
Park
Redevelopment:
Planning,
acquisi3on
and
redevelopment
of
Hun3ng
Park
Area Library
system
expansion: Construc3on
of
two
new
regional
libraries
in
north
and
south
sec3ons
of
the
city Housing
Produc3on
&
Preserva3on:
Funding
for
preserva3on,
new
construc3on,
acquis3on,
housing
 counseling
and
an3‐foreclosure
programs Navy
Yard:
Site
prepara3on
and
development
of
the
new
Corporate
Center,
infrastructure
improvements
and
 other
projects
at
Naval
Yard Revitaliza3on
of
West
Market
Street:
Renova3ons,
construc3on
and
infrastructure
repair
on
the
West
Market
 Street
corridor Park
and
Recrea3on
capital
investment: Renova3on
and
deferred
maintenance
of
park
and
recrea3on
facili3es.

Includes
demoli3on
of
condemned
and
 abandoned
buildings,
repaving,
trail
construc3on
and
rehabilita3on,
environmental
restora3on,
historic Family
Court
Building
Development:
Consolida3on
and
reloca3on
of
the
Family
Court
facility Philadelphia
Museum
of
Art: Reconstruc3on
of
loading
docks
and
other
infrastructure
improvements Market
StreetCoordior‐Market
East:
Acquis3on,
Construc3on,
infrastructure
and
related
costs
to
revitalize
 Market
Street
Corridor
and
Coven3on
Center
District,
including
adjacent
Chinatown
development Library
Improvements: Project
comple3on
for
upgrades
and
expansion
of
central
library
 Exterior
moderniza3on
of
libraries: Windows
and
roof
replacements
at
all
libraries Heaters: Install
2,000
high
efficiency
heaters Chiller
Replacement: Philadelphia
Public
Property
Chiller
Replacement
at
Criminal
Jus3ce
Center.
2
year
payback
in
energy
cost
 savings
for
replacement
of
inefficient
gas
chillers
with
new
electrical
chillers.(1) Triplex
‐
commercial
office
buildings: Chiller
plant
and
controls
moderniza3on LED
Lamps: Replace
incandescent
bulbs
and
ten
year
old
LED
lamps
with
new
all
LED
Lamps
for
3000
signalized
 intersec3ons
in
the
City,
which
will
save
the
City
$1,000,000.
per
year
in
energy
cost
(1) Residen3al
Rehabilita3on: PGW
Conserva3on
Works
Program
Expansion
and
Redirec3on
for
Residen3al
Rehabilita3on,
removing
 structural
barriers
to
energy
conserva3on(2) Residen3al
Solar
Energy
Revolving
Loan
Fund: Residen3al
Solar
Energy
Revolving
Loan
Fund
resul3ng
in
ini3a3on
of
solar
projects
at
500
residences
in
city
of
 Philadelphia(2)

Funding
Required

Jobs












5,000,000


58










10,000,000


111










10,000,000


111










10,000,000


111










10,000,000


118










10,000,000


118










12,000,000


141










15,000,000


176










15,000,000


176










15,000,000


176










20,000,000


222










20,000,000


222










20,000,000


222










20,000,000


222










25,000,000


278










25,000,000


278










25,000,000


278










25,000,000


278










25,000,000


278










25,000,000


278










30,000,000


333










30,000,000


333










30,000,000


352










50,000,000


556










50,000,000


556










50,000,000


556










70,000,000


823










75,000,000


833










80,000,000


889








100,000,000


1111








115,000,000


1351












9,000,000
 










7,000,000















550,000


12










15,000,000


70












6,000,000


94












1,000,000


100












4,000,000


100

City

State

Program

Philadelphia

PA

Energy

Philadelphia

PA

Energy

Philadelphia

PA

Housing

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Public
Safety

Philadelphia

PA

Schools

Philadelphia

PA

Streets/Roads

Philadelphia

PA

Streets/Roads

Project
Descrip3on Weatheriza3on: Whole
house
weatheriza3on
of
approximately
10,000
homes
in
the
next
12
months
($30m)
and
 weatheriza3on
job
training
of
addi3onal
auditors,
insulators,
and
roofers
($4.5m) City
Hall: Installa3on
of
modern
HVAC
systems PHA
Rehabilita3on
&
Development: Philadelphia
Housing
Authority
public
infrastructure
improvements
including
new
construc3on
and
 rehabila3on,
u3li3es,
curbing,
sidewalks
and
landscaping
for
Mill
Creek,
Riverview
and
Paschall
Homes
 developments,
amon Addi3onal
police
facili3es: Cri3cal
repairs
to
addi3onal
police
facili3es.

PICA
iden3fied
numerous
deficiencies
in
Police
districts
that
are
 priori3zed
accordingly:

2%
priority
one;
47%
priority
2;
14%
priority
3;
37%
priority.

PICA
funding
wil Casino
entertainment
corridor: Construc3on
of
a
new
combined
50,000
square
foot
facility
to
serve
the
ci3zens
amongst
the
developing
 entertainment
corridor
.

The
loca3on
would
include
the
reloca3on
of
the
6th
and
9th
police
districts. Co‐loca3on
of
services: Co‐loca3on
of
engine
20,
ladder
23
and
medic
1
for
casino
entertainment
district Engine
38: Reloca3on
of
Engine
38 Fire
Academy: Repairs
to
the
Fire
Academy Fire
repairs
and
replacement: Apparatus
repairs
and
replacement Juvenile
deten3on
facili3es: Construc3on
of
a
new
juvenile
deten3on
facility
&
cri3cal
repairs
to
exis3ng
facili3es Officers
for
power
shibs: 400
Officiers
for
Power
Shibs
‐
Desired
force
strength
is
7,000.

Inten3on
to
add
200
officers
not
realized
in
CY
 08
due
to
budgetary
constraints.

Addi3onal
400
officiers
would
bring
force
to
desired
strength. Prison
facility
repairs: Addi3onal
prison
facility
repairs
‐
upgrades
to
sprinkler
and
security
systems,
various
facili3es Regional
Training
Center: Redeveloping
the
Academy
Grounds
into
a
Regional
Training
Center
as
well
provide
for
the
renova3on
of
 acquired
federal
government
facili3es
located
at
Woodhaven
Rd.
and
Wissahickon
Ave. Sta3on
updates: Addi3onal
sta3on
updates Public
Safety
Community
Portal: Improve
public
safety
performance
by
community
groups
through
outreach
to
groups
such
as
PDAC,
 Crimewatch,
Townwatch,
fire
block
captains. Public
Safety
ERP: Improved
3me
repor3ng
for
3me
management,
scheduling,
and
over3me
payroll
management Prison
Mgmt
Systems: Upgrade
informa3on
management
system
to
improve
imate
tracking
and
medical
records. Infrastructrure
Stability: Improve
technology
posture
to
improve
stability
and
allow
for
growth. 911
Infrastructure: Upgrade
911
systems
to
increase
system
stability
and
performance
and
allow
for
growth. 800
MHz: Upgrade
the
digital
public
safety
radio
system
and
implement
new
underground
infrastructure
to
 accommodate
the
system Police
administra3on
building: Cri3cal
repairs
to
the
police
administra3on
building
including
mechanic,
electrical,
plumbing,
hea3ng
and
air
 condi3oning.

This
includes
a
possible
reloca3on
of
Headquarters
to
a
site
at
4601
Market
St.
and
the
poten Fusion
Center: Construc3on
and
co‐loca3on
of
police
resources
in
Fusion
Center Police/Fire
Radio: Police/Fire
emergency
communica3ons
radio
system
network. VSS
Fiber
Plant: Laying
network
of
fiber
to
enable
technologies
such
as
video
surveillance
cameras. Coloca3on
for
sex
crimes: Crea3on
of
central,
combined
loca3on
for
police
sex
crimes
unit,
human
services
sex
abuse
services,
and
 advocates
for
sexually
abused
and
assaulted
individuals Electronic
health
record: Purchase
and
deployment
of
electronic
health
records
across
the
prison
and
linked
health
systems Integrated
Health
Informa3on
System: Extend
health
and
opportunity
informa3on
systems
to
integrate
informa3on
mul3ple
agencies
and
 departments
(CARES). Morgue
and
Forensic
Laboratory: Reloca3on
of
obsolete
medical
examiner
offices,
morgue,
and
laboratory
facili3es. Underground: Enabling
access
to
public
safety
radio
system
in
the
subterranean
areas
of
the
city
(subway) Youth
Study
Center: Construc3on
of
new
juvenile
deten3on
facility
to
replace
inadequate
and
outdated
exis3ng
facility.

Currently
 in
temporary
loca3on. Renova3on
and
new
schools: to
support
renova3on
efforts,
fund
new
school
and
replacement
schools Lancaster
Avenue
traffic
signal
improvements: Traffic
Signal
improvement
project
for
the
Lancaster
Avenue
traffic
corridor. East
Coast
Greenway
Ped
Bridge:
Complete
final
design
and
construct
a
pedestrian
bridge
to
allow
 unobstructed
access
over
railroad
lines
to
a
por3on
of
the
East
Coast
Greenway
trail
network

Funding
Required

Jobs










34,500,000


110










20,000,000


120










50,000,000


556










40,000,000











17,000,000
 










8,000,000
 










6,500,000
 










3,500,000
 








40,000,000
 








30,000,000











25,000,000
 








63,000,000











38,000,000
 








32,500,000













5,000,000


5










15,000,000


20










10,000,000


25










15,000,000


50










20,000,000


60










60,000,000


110










70,000,000


115










40,000,000


120










40,000,000


120










40,000,000


125










12,000,000


141










15,000,000


176










35,000,000


200










40,000,000


470










30,000,000


500








110,000,000


1269








150,000,000
 










3,000,000


47












5,100,000


80

City

State

Program

Philadelphia

PA

Streets/Roads

Philadelphia

PA

Streets/Roads

Philadelphia

PA

Streets/Roads

Philadelphia

PA

Streets/Roads

Philadelphia

PA

Transit

Philadelphia

PA

Transit

Philadelphia

PA

Transit

Philadelphia

PA

Transit

Philadelphia

PA

Water

Passyunk
Avenue
Business
Corridor
traffic
signal
improvement: Traffic
signal
improvement
project
for
the

Passyunk
Avenue
Business
Corridor.

Also
includes
pedestrian
 improvements,
curb
bump‐outs,
realignment
and
traffic
island
construc3on. Street
Ligh3ng
Pole
Replacement
–
Install
5000
new
fiberglass
streetlight
poles
with
new
energy‐efficient
 luminaries
at
exis3ng
loca3ons
as
replacements
for
exis3ng
obsolete
aluminum
poles ADA
complaints
ramps: City
wide
program
to
accelerate
the
installa3on
ADA
compliant
ramps Street
Repaving‐Roadway
improvements
for
a
backlog
of
78
miles
of
Federal
Aid
(FAM)
streets;
work
included
 the
resurfacing
of
the
streets,
reconstruc3on
of
all
handicap
ramps
to
bring
them
in
compliance
with
new
ADA
 requirements;
design
and
placement Vehicle
Washer
Replacement
‐
 Fern
Rock
Shop
and
Frankford
Bus
Garage
‐
This
project
will
provide
for
installa3on
of
new
vehicle
washers
at
 Fern
Rock
Rail
Shop
and
Frankford
Bus
Garage.

Exis3ng
washers
at
both
loca3ons
have
been
in
opera3on
for
 over Callowhil/Victory
Bus
Garages
Ven3la3on
System
Improvements
‐
 This
project
will
provide
for
the
installa3on
of
a
new
bus
exhaust
systems
and
general
building
ven3la3on
 system
improvements
at
the
Callowhill
and
Victory
Bus
Garages.

The
new
bus
exha Broad
Street
Subway
Sta3ons
‐
 This
project
will
provide
for
the
construc3on
of
improvements
to
the
Girard
and
Spring
Garden
Sta3ons
on
the
 Broad
Street
Subway
Line.

These
sta3ons
were
originally
constructed
between
1928
and
1932
and
are
 showing
sig Purchase
of
40
Hybrid
Buses
‐
The
SEPTA
Board
awarded
a
contract
to
New
Flyer
of
America,
Inc.
for
the
 purchase
of
400
hybrid
(diesel/electric)
buses,
with
an
op3on
to
purchase
20
addi3onal
buses
each
year
for
4
 years.

SEPTA
could
quickly
award
an
op3 Water
Department
Headquarters
‐
Computer
center
HVAC
Upgrade
and
Back‐Up

Project
Descrip3on

Funding
Required

Jobs
















85,000


1

Philadelphia

PA

Water

Eden
St
Stormwater
Ouzall














300,000


5

Philadelphia

PA

Water

Stormwater
Deten3on
Basin
Retrofits
Program














300,000


5

Philadelphia

PA

Water

Replace
Roof
at
Water
Conveyance
Headquarters
Bldg.














396,000


6

Philadelphia

PA

Water

Bureau
of
Laboratory
Services
‐
fencing,
parking,
ligh3ng
and
security
improvements














600,000


9

Philadelphia

PA

Water

City
Facili3es
Green
Roof
Program












1,000,000


16

Philadelphia

PA

Water

Drainage
Right
of
Way












1,232,000


19

Philadelphia

PA

Water












1,335,000


21

Philadelphia

PA

Water

U3lity
and
Channel
Stabiliza3on
Projects
–
Two
projects
to
project
sewer
infrastructure
and
streams
from
 impacts
of
erosion. 29th
&
Cambria
Water
Conveyance
Headquarters
Improvements












1,716,000


27

Philadelphia

PA

Water

City
Facili3es
Green
Infrastructure
Retrofits












2,000,000


31

Philadelphia

PA

Water

Water
Department
Facili3es
Green
Infrastructure
Retrofits












2,000,000


31

Philadelphia

PA

Water

Biosolids
Recycling
Center












2,024,000


32

Philadelphia

PA

Water

Roxborough
Tanks
‐
finished
water
storage
rehabilita3on












2,200,000


35

Philadelphia

PA

Water

Green
Schools
Demonstra3on
Projects












2,500,000


39

Philadelphia

PA

Water

Flat
Rock
Dam
Rehabilita3on












2,600,000


41

Philadelphia

PA

Water

Design
/
Project
Management
/
Geotechnical
Inves3ga3ons
/
Infiltra3on
Tes3ng












3,000,000


47

Philadelphia

PA

Water












3,009,300


48

Philadelphia

PA

Water












4,163,250


65

Philadelphia

PA

Water

Southeast
Water
Pollu3on
Control
Plant
Improvements
–
Infrastructure
improvements
and
deferred
 maintenance. "I"
Street
&
Ramona
sewer
ouzall
storage
project: Construc3on
of
a
steel
gate
at
the
ouzall
to
store
combined
sewer
flow
in
the
sewer
and
prevent
it
from
 entering
the
stream.
The
stored
sewage
will
be
drained
down
slowly
into
our
system
aber
the
stor West
Philadelphia
sewer
maintenance
facilty












5,000,000


78

Philadelphia

PA

Water

Standby
generator
projects
at
Roxborough
Pump
Sta3on
and
Torresdal
Pump
Sta3on












5,650,000


89

Philadelphia

PA

Water












6,001,000


95

Philadelphia

PA

Water

Southwest
Water
Pollu3on
Control
Plant
Improvements
‐
Infrastructure
improvements
and
deferred
 maintenance. Stream
&
Wetland
Restora3on












9,000,000


141

Philadelphia

PA

Water

Cas3ng
and
manholes
adjustments
to
correspond
to
Streets
Department
paving
work










10,000,000


157

Philadelphia

PA

Water

Citywide
Street
Tree
Plan3ng
/
Planters
/
Swales










11,700,000


183

Philadelphia

PA

Water










12,409,000


195

Philadelphia

PA

Water

Mul3ple
Water
Main
Reconstruc3ons
: Water
Main
Reconstruc3on
Projects
–
19
projects
across
the
city
to
replace
mains
that
are
approximately
100
 years
old.

Projects
are
selected
based
on
a
point
system
that
takes
into
account
the
water
main
age,
#
of
 Queen
Lane
Water
Treament
Plant
Improvements










14,500,000


228

Philadelphia

PA

Water

Queen
Lane
high
service
pump
sta3on










15,000,000


235

Philadelphia

PA

Water










15,900,000


249

Philadelphia

PA

Water

Sewer
Lining
Projects
–
Four
projects
rehabilitate
sewers,
many
more
than
a
century
old,
that
otherwise
are
 prohibi3vely
expensive
or
extremely
difficult
to
reconstruct. Baxter
Water
Treatment
Plant

Improvements
‐
Infrastructure
improvements
and
deferred
maintenance.










16,344,000


255

Philadelphia

PA

Water

Belmont
Water
Treatment
Plant
Improvements
–
Deferred
facility
maintenance










25,488,000


401

Philadelphia

PA

Water

Northeast
Water
Pollu3on
Control
Plant
improvements
‐
infrastructure
and
deferred
maintenance










26,700,000


419

Philadelphia

PA

Water










30,735,000


480

Philadelphia

PA

Water

Water
and
Sewer
Reconstruc3on
Projects:
 24
projects
across
the
city
to
replace
mains
and
sewers
that
are
approximately
100
years
old.

Projects
are
 selected
based
on
a
point
system
that
takes
into
account
the
water
main
age,
#
of
water
main
breaks,
and Manayunk
sewer
overflow
basin










40,000,000


627

Philadelphia

PA

Water










40,000,000


627

Philadelphia

PA

Water

Poquessing
Intercep3ng
Sewer
Relief
Project: Construc3on
of
relief
sewer
to
mi3gate
overflows
 Engineering,
construc3on
management
and
administra3on
(15%)










42,188,888


661

Pifsburgh

PA

CDBG

Trail
Improvements‐Maintenance
and
repair
work
along
exis3ng
riverfront
trails












2,000,000


38

Pifsburgh

PA

CDBG

Beechview
Senior
Center
‐
Renovate
and
open
senior
center
in
Beechview.














500,000


43

Pifsburgh

PA

CDBG












3,000,000


57

Pifsburgh

PA

CDBG

Demoli3on/Greening
of
Vacant
Proper3es
‐
City
wide
demoli3on
of
vacant
and
blighted
proper3es,
site
 prepara3on
and
greening YMCA
(Hill
District)
‐
Construc3on
of
a
new
YMCA
in
the
City's
Hill
District












3,500,000


92












7,000,000


110










12,500,000


196










30,000,000


470










87,500,000


940












2,600,000


99












3,000,000


114










15,900,000


604










17,850,000
 678.3

City

State

Program

Pifsburgh

PA

CDBG

Point
State
Park
‐
Restora3on
of
historic
park
space
abuqng
CBD.

Project
Descrip3on

Pifsburgh

PA

CDBG

Conven3on
Center
Riverfront
Park
‐
Construc3on
of
park
along
underutlized
riverfront
alongside
the
new
 Conven3on
Center

Pifsburgh

PA

CDBG

City‐wide
Clay‐Based
Infields
‐
Replacing
and
adding
Clay‐Based
Infields
at
ballfields
throughout
the
city.

Pifsburgh

PA

CDBG

City‐wide
Playground
Safety
Surfaces
‐

Replacing
playground
safety
surfaces
throughout
the
city.

Pifsburgh

PA

CDBG

Pifsburgh

PA

CDBG

Heth's
Run
Restora3on
‐
Create
parkspace
to
convert
underutlized
riverfront
entrance
to
award
winning
 regional
zoo. City‐wide
Walls/Landslides
‐
Replacing
walls
and
remedia3ng
landslides
throughout
the
city.

Pifsburgh

PA

CDBG

North
Side
Development
Project
‐
Construc3on
of
a
new
community
center
to
serve
the
City's
North
Side

Pifsburgh

PA

CDBG

Pifsburgh

PA

CDBG

Pifsburgh

PA

CDBG

Pifsburgh

PA

CDBG

Pifsburgh

PA

Energy

South
Side
Works
Riverfront
Park
‐
Development
of
marina,
public
park
and
rivertrail
system
in
support
of
the
 $300+
million
South
Side
Works
development Re‐use
of
Vacant
Schools
‐
Adap3ve
reuse,
reconfigura3on
and
rehabilita3on
of
22
closed
schools
into
 residen3al/mixed
used
developments Supermarket
Development
‐
Support
of
supermarket
infrastructure
and
development
in
City's
underserved
 neighborhoods Youth
Employment
‐
Employ
1000
teenagers
who
work
to
eliminate
blight.

This
year's
program
could
only
 accommodate
a
frac3on
of
the
applicants. City‐wide
Court
Ligh3ng
‐
Replacing
and
adding
LED
court
ligh3ng
throughout
the
city.

Pifsburgh

PA

Energy

Confluence
Ligh3ng
‐
Installing
and
upgrading
LED
trail
ligh3ng
city‐wide.

Pifsburgh

PA

Energy

City‐wide
Ballfield
Ligh3ng
‐
Replacing
and
adding
LED
ligh3ng
at
ballfields
throughout
the
city.

Pifsburgh

PA

Energy

Pifsburgh
Green
Innovators
‐
Living
learning
and
earning
center
based
on
cuqng
edge
green
technology.

Pifsburgh

PA

Housing

Pifsburgh

PA

Housing

Pifsburgh

PA

Housing

Pifsburgh

PA

Housing

American
Electric
‐
Public
infrastructure
to
support
31
unit
market
rate
housing
development
on
a
former
 brownfield
site Wood
Street
Commons
‐
Restore
underu3lized
commercial
space
in
the
CBD
building
which
provides
258
 affordable
housing
units Federal
North
‐
Redevelopment
of
a
blighted,
historic
block
of
commercial/residen3al
buildings
in
the
heart
of
 the
City's
North
Side Oak
Hill
Phase
2
‐
Public
infrastructure
to
support
200+
mixed‐income
housing
on
a
former
public
housing
site

Pifsburgh

PA

Public
Safety

21st
Century
Public
Safety
Facili3es
‐
Renovate
all
public
safety
facili3es
city‐wide.

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Hot
Metal
Bridge
Capacity
Improvement
‐
Add
turning
lane
to
increase
traffic
flow
in
highly
congested
artery
to
 the
South
Hills. City‐wide
Walkway
Ligh3ng
‐
Replacing
walkway
ligh3ng
throughout
the
city.

Pifsburgh

PA

Streets/Roads

Arena
Walkway
‐
Walkway
near
arena
for
pedestrian
accessibility.

Pifsburgh Pifsburgh Pifsburgh

PA PA PA

Streets/Roads Streets/Roads Streets/Roads

East
Liberty
Pedestrian
Bridge
‐
Adding
a
pedestrian
bridge
to
connect
East
Liberty
and
Shadyside. North
Side
Underpasses
‐
Infrastructure
construc3on
for
mul3‐modal
corridor
connec3ons
to
improve
auto,
 Mon
Wharf
Switchback
‐
Replacing
parking
spaces
to
connect
the
bike
trail
along
the
Monongahela
River.

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Route
28
Bike
Trail
‐
Construc3on
of
a
riverfront
bike/ped
trail
in
conjunc3on
with
the
Route
28
widening
 project. Strip
District
Infrastructure
‐
Public
infrastructure
in
support
of
mixed
use
riverfront
development

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Lexington
Technology
Park
Parking
‐
Demoli3on
of
an
unsafe
warehouse
structure
at
a
office
park
complex
in
 Homewood
to
convert
for
added
parking City‐wide
Brick
and
Blockstone
Restora3on
‐
Replacing
brick
and
blockstone
throughout
the
city.

Pifsburgh

PA

Streets/Roads

City‐wide
Steps
‐
Replacing
steps
throughout
the
city.

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Penn
Avenue
Streetscape
Imp.
‐
Sidewalk,
traffic,
ligh3ng
and
amenity
enhancements
to
Penn
Avenue,
34th
to
 Negley.
 City‐wide
Concrete
Slab
Replacement
‐
Replacing
concrete
slab
throughout
the
city.

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Streets/Roads

Market
Square
‐
Redevelopment
of
the
most
prominent
public
square
in
Downtown
Pifsburgh,
suppor3ng
$50
 million
development New
Arena
Infrastructure
‐
Public
infrastructure
in
support
of
$311
million
construc3on
of
new
mul3‐purpose
 arena City‐wide
Asphalt
‐
Replacing
asphalt
throughout
the
city. Wood
Street
Reconstruc3on
‐
Infrastructure
construc3on
Downtown
to
support
expansion
of
Point
Park
 University Commercial
Corridor
Improvements
‐
Public
infrastructure
and
gateway
improvements
to
City's
50
 neighborhood
commercial
districts South
Side
Works
Parking
Garage
‐
Construc3on
of
600
space
parking
structure
to
support
mix
use
 development East
Carson
Street
Widening
‐
Widening
1
mile
of
Carson
Street
to
accommodate
450
million
development.

Funding
Required 










4,500,000


Jobs 96












2,000,000


122












6,550,000


125












6,550,000


125












7,800,000


149












7,300,000


153












4,000,000


183












4,602,224


260










10,000,000


391










15,000,000


487












2,700,000


1000












1,920,000


37












3,000,000


57












6,600,000


126












6,500,000


748












1,500,000


29












4,000,000


76












2,000,000


88












6,000,000


125










40,000,000


764














500,000


10














885,000


17












1,200,000
 












930,000
 










1,500,000


29 34 46












2,500,000


48












1,900,000


55












3,000,000


57














500,000


60












4,464,000


85












4,700,000


96












5,000,000


96












5,265,000


101












2,000,000


121












7,500,000


143










10,000,000


191












5,000,000


196










10,000,000


441










10,000,000


441












9,500,000


767

City

State

Program

Pifsburgh

PA

Streets/Roads

Pifsburgh

PA

Water

Nabisco
Plant
(Bakery
Square)
‐
Public
infrastructure
improvements
adjacent
to
$113
million
mixed
use
 redevelopment
of
a
brownfield
site Sand
Filters
Rehabilita3on
‐
Replace
Filter
Media
and
Underdrain.
Upgrade
Filter
Control
System

Project
Descrip3on

Pifsburgh

PA

Water

Penguins
Arena
‐
Water
and
Sewer
Infrastructure
Improvements

Pifsburgh

PA

Water

Clarifiers
1,
2
&
3
Sludge
Collector
‐
Replace
Sludge
Collector
Equipment
and
Switchgear

Pifsburgh

PA

Water

Safety
and
Security
Improvements
‐
Repair
Fencing
and
install
security
cameras
treatment
plant
and
basins.

Pifsburgh

PA

Water

Route
28
Reconstruc3on
‐
Reloca3on
of
Water
and
Sewer
Facili3es

Pifsburgh

PA

Water

Filter
Backwash
Recycle
System
‐
Construct
Filter
Backwash
Storage
Tank
and
Recycle
Pump
Sta3on

Pifsburgh

PA

Water

State
College

PA

Streets/Roads

Bruecken
Pump
Sta3on
Improvements
‐
Standby
Power,
21
MGD
Pump
Addi3on,
Replace
Valves,
and
Security
 Improvements Reconstruc3on
of
North
and
South
Barnard
Street

State
College

PA

Streets/Roads

Intersec3on
Safety
Improvements
Allen
St/Atherton
St
Intersec3on

State
College

PA

Streets/Roads

Reconstruc3on
of
100
block
of

South
Fraser
Street
and
Realignment
of
Fraser/Beaver
Intersec3on












1,000,000


50

State
College

PA

Streets/Roads

Replace
Deteriorated
Street
Lights
in
Downtown












2,800,000


120

Wilkes‐Barre

PA

CDBG

Improvements
to
City
Hall














500,000


5

Wilkes‐Barre

PA

CDBG

Improvements
to
DPW
facility














500,000


5

Wilkes‐Barre

PA

CDBG

Demoli3on
of
blight












1,000,000


20

Wilkes‐Barre

PA

CDBG

Housing
rehabilita3on
program













1,000,000


20

Wilkes‐Barre

PA

CDBG

Parks
and
recrea3on
enhancements













3,000,000


20

Wilkes‐Barre

PA

CDBG

Supplement
to
$14
million
Coal
Street
Park
redevelopment
project












5,000,000


25

Wilkes‐Barre

PA

Public
Safety

Citywide
security
camera
ini3a3ve













2,000,000


25

Wilkes‐Barre

PA

Streets/Roads

Downtown
Streetscape
Project













3,000,000


10

Wilkes‐Barre

PA

Streets/Roads

Milling
and
paving
of
various
city
streets












5,500,000


10

Wilkes‐Barre

PA

Streets/Roads

Purchase/employ
addi3onal
DPW
equipment/workers












5,000,000


10

Wilkes‐Barre

PA

Streets/Roads

Reconstruct
bridges/culverts
citywide












9,000,000


10

Wilkes‐Barre

PA

Streets/Roads

Reconstruc3on
of
Wilkes‐Barre
Boulevard












8,000,000


10

Wilkes‐Barre

PA

Streets/Roads

"greening"
Wilkes‐Barre
program














500,000


15

Wilkes‐Barre

PA

Streets/Roads

Reconstruc3on
of
Public
Square













5,000,000


15

Wilkes‐Barre

PA

Streets/Roads

Spring/Bowman
Run
Channel
upgrades












5,000,000


15

Wilkes‐Barre

PA

Streets/Roads

Coal
Street
Road
project
‐
phase
2











10,000,000


25

Wilkes‐Barre

PA

Streets/Roads

Citywide
street
sign
and
pole
replacement












2,000,000


30

Wilkes‐Barre

PA

Streets/Roads

Reconstruc3on
of
Laurel
Run
Creek
walls










10,000,000


30

Wilkes‐Barre

PA

Streets/Roads

Reconstruc3on
of
Mill
Creek
walls










10,000,000


30

Wilkes‐Barre

PA

Streets/Roads

Reconstruc3on
of
Solomons
Creek
walls










60,000,000


50

Wilkes‐Barre

PA

Streets/Roads

Intermodal
Transporta3on
Facility/downtown
garage












3,000,000


60

Wilkes‐Barre

PA

Water

Citywide
sanitary
sewer
upgrades











15,000,000


30

Wilkes‐Barre

PA

Water

Citywide
storm
sewer
upgrades










20,000,000


30

Wilkes‐Barre

PA

Water

Coalbrook
Creek
reloca3on











20,000,000


30

York

PA

Energy

Guaranteed
Energy
Savings
Project












1,500,000


15

York

PA

Streets/Roads

Street
resurfacing












1,000,000


15

York

PA

Water

York
City
WWTP
upgrades










15,000,000


30

Anasco

PR

CDBG












8,000,000


100

Anasco

PR

CDBG

Construc3on
of
a
conven3on
center
to
house
commercial
and
business
promo3on
exhibits,
professional
 conven3ons
and
other
related
ac3vi3es. Rehabilita3on
and
expansion
of
the
City
market
square
which
is
actually
closed
for
business.












6,500,000


100

Anasco

PR

CDBG












6,000,000


150

Anasco

PR

CDBG

Construc3on
of
high
tech
and
sustainable
energy
careers
ins3tute
in
joint
venture
with
higher
educa3on
 in3tu3on
Eastern
University.
Project
will
provide
high
tech
and
sustainable
enerty
career
opportunites
to
 underserved
area. Construc3on
of
a
condo‐hotel
in
the
jurisdic3on's
coastal
zone
providing
new
rooms
availability
to
the
area.












7,000,000


200

Anasco

PR

Streets/Roads












3,000,000


75

Anasco

PR

Water












6,500,000


250

Arroyo

PR

CDBG














700,000


75

Arroyo

PR

CDBG














500,000


100

Arroyo

PR

CDBG












1,350,000


150

Barceloneta

PR

CDBG












5,800,000


100

Barceloneta

PR

CDBG










20,000,000


300

Barceloneta

PR

Energy












1,000,000


25

Project
to
connect
PR
30
with
PR
2
allevia3ng
traffic
conges3on
providing
road
transporta3on
alterna3ves
to
 already
jammed
residen3al
areas. Water,
wastewater
and
sewer
rehabilita3on
for
downtown
Anasco
to
serve
exis3ng
business
and
commerce,
 and
allow
construc3on
of
new
commercial
and
business
facili3es. Construc3on
of
new
roads,
expansion
and
rehab
of
the
rural
road
system.
Project
will
acelerate
and
enhance
 communica3ons
from
the
urban
area
to
the
rural
communi3es. Construc3on
of
3
community
services
centers.
Project
will
serve
3
low
income
communi3es
bringing
 community
assistance
to
underserved
popula3on. Construc3on
of
3
Head
Start
facili3es
at
a
cost
of
$450,000
each
in
order
to
expand
program
and
assist
 underserved
popula3on.
Project
will
benefit
90
children. Construc3on
of
parking
facili3es
in
downtown
Barceloneta
providing
space
for
400
vehicles.
Project
will
 alleviate
urban
traffic
conges3on
bringing
needed
infrastructure
to
downtown
commercial
development.
It
is
 another
ready
to
go
project
which
counts
 Funding
to
create
a
revolving
fund
to
finance
ready
to
go
housing
projects
for
underserved
popula3on.
 Revolving
fund
will
provide
financing
for
underfunded
projects
due
to
financial
crisis.
Housing
projects
will
 provide
rental
housing
and
low
income
hous Solar
power
system
installa3on
in
public
building
housing
local
government
program
service
offices.
Project
 will
reduce
City
expenditures
and
dependency
on
electric
power
based
on
fossil
fuel.

Funding
Required

Jobs












5,000,000


1196
















24,800


0












1,000,000


19












3,900,000


74












4,500,000


86












6,000,000


115












8,000,000


153










12,000,000


229














500,000


25














750,000


33

City

State

Program

Barceloneta

PR

Water

Barceloneta

PR

Water

Caguas

PR

CDBG

Rehabilita3on
of
aging
waste
water
sewer
system
in
Barceloneta's
urban
core.
Project
will
expand
capacity
 serving
the
urban
area
permiqng
new
connec3ons
to
the
system.
Projected
service
expansion
will
allow
the
 development
of
new
land
rescued
to
the
f Construc3on
of
new
waste
water
sewer
system
at
Garrochales
ward.
Project
will
provide
services
to
1,500
 families,
small
businesses,
and
industrial
facili3es.
Further
economic
development
requires
the
construc3on
of
 this
sewer
system.
Project's
Phase
is Head
Start
Center
Villas
del
Rey

Project
Descrip3on

Caguas

PR

CDBG

Construc3on
of
neighborhood
center
and
facili3es
and
street
improvements

Caguas

PR

CDBG

Improvements

and
construc3on
of
recrea3onal
facili3es
and
gazebos
in
the
Municipal
Parks

Caguas

PR

CDBG

Water
Flood
Mi3ga3on
of
Ravine
Los
Muertos

Caguas

PR

CDBG

Ecologic
Corridor
Between
Aguas
Buenas
Cave
System
and
Cultural
and
Botanical
Garden

Caguas

PR

Energy

Installa3on
of
solar
panels
and
renewable
energy
system
on
Villa
Turabo
Housing

Caguas

PR

Housing

Demoli3on
and
construc3on
of
José
Gau3er
Benítez
Public
Housing

Caguas Caguas Caguas Caguas Caguas Caguas Caguas Caguas Caguas Caguas

PR PR PR PR PR PR PR PR PR PR

Public
Safety Public
Safety Schools Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Transit

Caguas

PR

Water

Recrui3ng
addi3onal
police
officers Installa3on
of
a
Closed
circuit
cameras
system
in
the
Central
Business
District
Center Moderniza3on
and
Rehabilita3on
of
José
Gau3er
Benítez
School Construct
two
lanes
and
Improve
roadway
and
sidewalk
addi3on
to

State
highway
#96 Improvement
of
roadway
and
sidewalk
at
Degetau
Avenue Improvement
of
street
J
in
Morales
Ward Improvement
of
Central
Business
District
streets
and
sidewalks Construc3on
and
Improvements
of
rural
roads,
bridges,
asphalt
roads,
sidewalks
and
urban
streets Purchase
of
buses
and
equipment,
restore
facili3es
and
pavement
markings
to
establish
Transcriollo
Public
 Infrastructure
construc3on,
rail
system
installa3on,
and
rail
cars
purchase
for
a
Train

System
from
Caguas
to
 Cupey
Sta3on
in
Rio
Piedras Improvement
of
sanitary
sewer
and
water
system
in
the
Central
Business
District
Center

Camuy

PR

CDBG

Camuy Camuy

PR PR

CDBG CDBG

Ciales

PR

CDBG

Ciales

PR

CDBG

Ciales

PR

CDBG

Ciales

PR

CDBG

Rehabilita3on
of
old
structures
to
meet
currrent
demand
for
commercial
as
well
as
moderate
income
housing
 in
downtown
area. Rehabilita3on
of
a
downtown
Farmer
Market.

Ciales

PR

CDBG

Ciales

PR

CDBG

Ciales

PR

Ciales

Funding
Required

Jobs












1,000,000


75












5,000,000


100












1,000,000


40












2,000,000


50












1,000,000


60














800,000


100












1,700,000


150










12,000,000


150










55,000,000
 










3,000,000
 










4,000,000
 










4,000,000
 










3,000,000
 










2,000,000
 










1,000,000
 








10,000,000
 










8,000,000
 








20,000,000


400 40 50 70 50 60 60 200 300 300








350,000,000


500










10,000,000


200










10,000,000
 










2,570,000


50 135










13,668,505


275














400,000


12














500,000


14














500,000


14














600,000


17

Rehabilita3on
of
an
extension
of
City
Hall
Administra3ve
Building












4,000,000


40












1,500,000


42

CDBG

Moderate
rehabilita3on
of
at
least
100
housing,
according
to
construc3on
codes,
in
differents
wards.
 Construc3on
of
sep3c
tanks
if
needed. Reloca3on
of
aerial
electric
and
other
u3li3es
to
underground
in
downtown
area.












5,000,000


50

PR

CDBG

Construc3on
of
54
apartments
at
downtown
area.












5,400,000


54

Ciales

PR

CDBG

Crea3on
of
a
revolving
fund
to
provide
financial
assistance
to
small
business
that
creates
or
maintains
jobs












8,400,000


84

Ciales

PR

Energy

Conversion
of
public
parks
and
other
facili3es
to
LED
ligh3ng












2,000,000


20

Ciales

PR

Energy












3,000,000


90

Ciales

PR

Public
Safety














200,000


6

Ciales

PR

Public
Safety

Ciales

PR

Streets/Roads

Construc3on
of
the
second
phase
of
bicycle
path
next
to
Grande
de
Mana3
River.
The
second
phase
will
 connect
with
the
exis3ng
recrea3onal
facili3es. Adquisi3on
and
maintenance
of
satelite
sensors
and
alarm
system
to
the
Grande
de
Mana3
River
to
safe
lives
 during
floodwater Community
Policing‐Up‐to‐date
equipment
for
the
Ciales
Police
Department,
including
digital
cameras,
 upgraded
ballis3c
protec3on
vests,
and
crime
suppression
patrol
staffing Sidewalks,
cubs
and
repavement
improvements
of
municipal
roads
for
different
wards
and
downtown
area.

Ciales

PR

Transit

Ciales

PR

Water

Ciales

PR

Water

Ciales

PR

Water

Ciales

PR

Water

Sewer
replacement
80+
year‐old
sewer
infrastructure;
install
a
new
one
with
higher
capacity
which
will
help
 avoid
poten3al
sewer
discharge Water
Distribu3on
System
Improvements
‐
This
project
would
replace
old
cast
water
mains
that
have
reached
 the
end
of
their
useful
service
lives Construc3on
of
the
first
phase
of
17
kilometer
of
sewer
infrastructure
in
Cordillera
and
Fronton
wards.

Cidra

PR

CDBG

Cidra

PR

Cidra

Construc3on
of
a
sport
arena,
and
sport
complex
to
provide
space
for
professional
sports
presenta3ons,
 business
exhibits,
and
sport
ac3vi3es
for
the
general
public. Second
phase
construc3on
of
the
local
fiherman's
wharf
includes
the
construc3on
of
storage
and
cleaning
 Construc3on
of
new
wastewater
sewage
facili3es
along
PR
2,
Puente
ward,
and
the
City's
urban
area
to
serve
 2,500
households
and
small
business. Improvements
to
library
facili3es
at
urban
area
core.
The
project
consists
of
improvements
to
exis3ng
facili3es
 structure
which
urgently
need
rehabilita3on Cleaning
of
80+
years
channel
creek.














500,000


30












3,000,000


30














700,000


20












3,600,000


100












1,200,000


100










25,500,000


255

Acquire
land
to
increase
Hotel
Treasure
Island












1,500,000


43

CDBG

Acquire
Proper3es
for
redevelopment
for
low
income
housing












1,500,000


43

PR

CDBG

Improve
track
and
land
for
lifle
league
parking








150,000,000


43

Cidra

PR

CDBG

Construc3on
of
swales
in
various
wards












3,000,000


86

Cidra

PR

CDBG

Acquire
land
to
increase
municipal
cemetary












4,000,000


114

Cidra

PR

CDBG

Acquire
land
for
low
income
facili3es












5,000,000


143

Cidra

PR

CDBG

Acquire
Proper3es
for
proper3es
city
baseball
stadium










15,000,000


428

Cidra

PR

CDBG

Construc3on
of
New
Culture
Art
Center










15,000,000


428

Cidra

PR

CDBG

Familiy
Recrea3on
Park
Facility










15,000,000


428

Cidra

PR

Energy

Solar
water
Heaters
for
rural
area
families








500,000,000


14

Cidra

PR

Energy

Install
solar/wind
in
all
city
recrea3on
facili3es












2,000,000


48

City‐wide
Transit‐oriented
Development‐acquisi3on,
redevelopment,
and
infrastructure
for
transit‐oriented
 development

City

State

Program

Cidra

PR

Energy

Install/Solar
wind
in
all
city
facili3es

Project
Descrip3on

Cidra

PR

Energy

Study
Construct
Methean
gas
sta3on
on
city
closed
land
fill

Cidra

PR

Energy

New
Energy
Efficiency
Industrial
Zones
100
Acres

Cidra

PR

Housing

Cidra

PR

Cidra

Funding
Required 










2,000,000


Jobs 48










35,000,000


1000




17,500,000,000


1628

Demoli3on
and
redevelopment
of
Jardines
Public
Housing
Project










20,000,000


561

Housing

Demoli3on
and
redevelopment
of
praxedes
san3ago
public
housing
project
in

sustainable
housing
project










20,000,000


561

PR

Public
Safety

Installa3on
of
Security
Cameras
in
all
Recreea3onal
facili3es.








100,000,000


29

Cidra

PR

Public
Safety

Installa3on
of
Security
Cameras
in
all
Public
Facili3es.












1,500,000


43

Cidra

PR

Schools

Construc3on
of
University
of
The
Arts












2,500,000


714

Cidra

PR

Streets/Roads

Construc3on
of
Bridge
in
Rio
Abajo
Ward












2,000,000


57

Cidra

PR

Streets/Roads

Repavement
of
State
Route
in
city
boundary












3,000,000


86

Cidra

PR

Streets/Roads

Construc3on
final
phase
city
inner
loop












6,000,000


171

Cidra

PR

Streets/Roads

New
Bridge
construc3on
outer
loop












7,000,000


200

Cidra

PR

Streets/Roads

Widen
Route
172
to
inner
city










20,000,000


561

Cidra

PR

Streets/Roads

Construc3on
of
phases
1,2
and
three
of
outer
loop










25,000,000


714

Cidra

PR

Streets/Roads

Construc3on
of
new
highway
connec3ng
to
PR‐Rate
52










60,000,000


1700

Cidra

PR

Transit

Connect
Transporta3on
to
PR‐Rate
7733












2,000,000


57

Cidra

PR

Transit

New
Transportaion
Center












2,000,000


57

Cidra

PR

Transit

Expanded
Transporta3on
Terminal












3,000,000


86

Cidra

PR

Water

Construct
waste
water
sewer
for
Beatriz
Ward
















25,000


714

Cidra

PR

Water

Reconstruct
water
and
sewer
drains
in
city
downtown
area










30,000,000


857

Corozal

PR

CDBG












2,000,000


45

Corozal

PR

CDBG












7,000,000


75

Corozal

PR

CDBG














400,000


80

Corozal

PR

CDBG












9,000,000


85

Corozal

PR

CDBG












7,800,000


250

Corozal

PR

Energy












2,000,000


45

Corozal

PR

Public
Safety

CONTRUCTION
OF
A
MUNICIPAL
THEATER
IN
THE
URBAN
ZONE
AT COROZAL
PUERTO
RICO.
THIS
PROJECT
WILL
BE
CONSTRUCTED
AS
PART
OF
A
REVITALIZATION
OF
THE
URBAN
 ZONE
IN
COROZAL
PUERTO
RICO
FOR
CULTURAL,
FINE
ARTS
ARE
OTHER
ACTIVITIES
THAT
WILL
HELP
SERVE
AS
 AN
ATR REVITALIZATION
OF
CITY
SQUARE
AT
COROZAL,
PUERTO
RICO.THIS
PROJECT
INCLUDES
UNDERGROUND
 ELECTRICAL.TELEPHONE,CABLE
TV WORK
AND
RECONSTRUCTION
OF
THE
CITY
SQUARE IMPROVEMENTS
TO
LIBRARY
FACILITIES
AT
URBAN
CORE
COROZAL
PUERTO
RICO
PROJECT
CONSIST
OF
 IMPROVEMENTS
TO
EXISTING
FACILITIES
STRUCTURE
WHICH
URGENTLY
NEEDS
REHABILITATION
OF
SOME
 AREAS
WHICH
IS
DETERIORATED
DUE
TO
USE
AND
CLIMATE
FACTORS.
PROJECT
HAS
ALL
P IMPROVEMENTS
TO
COVERED
BASKETBALL
COURT
AT
STATE
ROAD
159
COROZAL
PUERTO
RICO.THIS
PROJECT
 INCLUDES
ADDITIONAL
SPACE,REMODELLING
EXISTING
STRUCTURE,INSTALLATION
OF
HIGH
EFFICIENCY
AIR
 CONDITION,AND
CONSTRUCTION
OF
MULTY
STORY
PARKING COMMERCIAL
OFFICES
AT
URBAN
CORE
COROZAL
PUERO
RICO
PROJECT
CONSIST
CONSIST
IN
THE
 CONSTRUCTION
OF
A
THREE
STORY
BUILDING
THAT
WILL
CREATE
COMMERCIAL
LEASE
SPACES
IN
THE
URBAN
 AREA
WERE
THE

SMALL
TRADITIONAL
ARE
LOCATED.
THE
LAND
WERE
THE
PROJECT
IS
PROP REPLACEMENT
OF
ELECTRICITY
POLES
WITH
ENERGY
EFFICIENCY
IN
DIFFERENT
WARDS
OF
COROZAL,PUERTO
 RICO 
VIDEO
MONITORING
SURVAILLANCE
SYSTEM
AT
COROZAL,
PUERTO
RICO













1,000,000


20

Corozal

PR

Public
Safety












1,100,000


28

Corozal

PR

Streets/Roads












3,000,000


90

Corozal

PR

Transit

HIRING
OF
NEW
MUNICIPAL
POLICE TO
EXTEND
SERVICE
PROTECTION
IN
OTHER
WARDS
IN
THE
MUINICIPALITY
OF
COROZAL
PUERTO
RICO

AND
 ADQUISITION
OF
LAW
ENFORCE
EQUIPMENT
AND
TECHNOLOGY REPAVEMENT
OF
MUNICIPAL
ROADS
AT
DIFFERENT
WARDS
AND DOWNTOWN
 COROZAL,PUERTO
RICO CONSTRUCTION
OF
MASS
TRANSPORTATION
BUILDING
AT
URBAN
ZONE
COROZAL
PUERTO
RICO












5,000,000


80

Corozal

PR

Water

CONSTRUCTION
OF
SANITARY
SEWER
SYSTEM
AT
VALLE
ARAMANA
COMMUNITY
COROZAL
PUERTO
RICO












3,000,000


50

Corozal

PR

Water












4,827,000


60

Guanica

PR

CDBG












6,000,000


40

Guanica

PR

CDBG

CONSTRUCTION
OF
SANITARY
SEWER
SYSTEM
AT
GUARICO
COMMUNITY
PALMAREJO
WARD,
COROZAL
 PUERTO
RICO.THE THE
PROJECT
CONSIST
OF
CONSTRUCTION
OF
SANITARY
SEWER
TO
INSTALL
446
HOUSE
CONNECTIONS
IN
AN
 AREA
NEAR
THE
URBAN
ZONE.DESIGN
AND
ALL
NECESARY
ENGINNERING
S Reconstruc3on
of
historic
lighthouse,
construc3on
of
new
sewage
and
sanitary
systems,
and
construc3on
of
 commercial
facili3es. Development
of
a
50
rooms
hotel
in
the
old
town's
district
to
increse
tourist's
offer
in
Guanica.












5,000,000


90

Hormigueros

PR

CDBG

Construc3on
of
park
in
residen3al
area
within
downtown
to
serve
families
with
small
children.














500,000


20

Hormigueros

PR

CDBG

Rehab
of
old
train
sta3on
to
develop
the
local
museum
of
transporta3on.














500,000


25

Hormigueros

PR

CDBG












5,000,000


40

Hormigueros

PR

CDBG

Hotel
development
in
the
old
sugar
mill.
Project
will
be
operated
by
the
City
crea3ng
new
jobs
genera3ng
 recurrent
income
for
the
local
government. Rehab
of
historic
building
and
conversion
into
a
community
service
center.














700,000


40

Hormigueros

PR

CDBG












2,000,000


50

Hormigueros

PR

CDBG

Channeliza3on
of
2
creeks
that
split
urban
communi3es
which
cause
recurrent
flooding
whenever
hurricanes
 and
tropical
systems
associated
with
heavy
rains
affect
the
Island.
Recurrent
flooding
are
a
constant
menace
to
 lives
and
property
in
this
communi3 Landfill
expansion
and
equipment
acquis3on
to
expand
use
of
the
facili3es.












2,800,000


52

Hormigueros

PR

CDBG

Construc3on
of
a
community
service
center
to
provide
assistance
to
underserved
popula3on
in
the
rural
area.














600,000


57

Hormigueros

PR

CDBG












1,000,000


75

Hormigueros

PR

CDBG

Construc3on
of
a
mul3purpose
building
to
provide
access
to
city
government
assistance
programs
to
 underserved
popula3on. Construc3on
of
community
service
center
to
provide
assistanc
to
underserved
popula3on
in
the
rural
area.












1,000,000


75

Hormigueros

PR

CDBG












1,500,000


80

Hormigueros

PR

CDBG

Construc3on
of
gymnas3c
pavillion
to
hold
interna3onal
compe3ons
genera3ng
tourists
flow
associated
with
 sport
events. Rehabilita3on
and
expansion
of
local
theater.












2,000,000


85

Hormigueros

PR

CDBG












2,500,000


90

Hormigueros

PR

CDBG












2,000,000


100

Rehabilita3on
of
abandoned
industrial
building
to
develop
a
mul3purpose
facility
for
small
businesses,
and
 other
commercial
and
small
industries
facility. Expansion
of
local
sport
arena
enabling
the
City
to
bring
new
events
to
the
area.
Project
will
increase
the
 number
of
events
raising
the
number
of
afendants
,
and
genera3ng
more
economic
ac3vity.

City

State

Program

Hormigueros

PR

CDBG

Project
Descrip3on

Hormigueros

PR

CDBG

Hormigueros

PR

CDBG

Hormigueros

PR

CDBG

Hormigueros

PR

CDBG

Hormigueros

PR

Energy

Hormigueros

PR

Housing

Hormigueros

PR

Public
Safety

Hormigueros

PR

Public
Safety

Hormigueros

PR

Public
Safety

Hormigueros

PR

Streets/Roads

Hormigueros

PR

Transit

Hormigueros

PR

Water

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

CDBG

Juana
Diaz

PR

Energy

New
Touris3c
and
Pasive
Park
at
Salto
de
Collores
ward.
The
construc3on
of
a
new
pasive
and
recrea3onal
park
 with
play
ground
equipment
ADA
complain.
New
Gazebos,
Cafeteria,
Kiosks,
and
Parking
Lot.
 Rehabilita3on
of
a
Beachfront
Touris3c
Area
at
Camboya
Ward.

Improvements
to
gacebos,
bathrooms,
 lifesaver
offices,
and
a
construc3on
of
a
wavebraker.
 Improvements
to
Raul
Torres
Stadium.
The
improvements
includes
a
new
grand
stand,
new
cafeteria
areas,
 new
communica3on
and
transmi3osn
system
and
new
ligh3ng
system.

Also,
we
will
have
improvements
on
 the
playing
field. The
construc3on
of
a
new
Conven3on
Center
with
a
capacity
of
2,000
persons
including
parking
spaces
for
350
 vehicles.

The
fascili3es
will
have
a
main
room,
and
4
smaller
rooms
for
other
ac3vi3es.
 Construc3on
of
the
new
fascili3es
for
the
Municipal
Services
Departments
and
for
the
Mayor
Administra3ve
 Offices.
 Underground
Installa3on
of
the
Electrical
Lines
and
other
U3li3es
Insfraestructure.


Juana
Diaz

PR

Housing

Improvements
and
repairs
of
more
than
200
houses
at
the
urban
area
for
low
income
individuals.


Juana
Diaz

PR

Public
Safety

Juana
Diaz

PR

Public
Safety

Construc3on
of
the
new
fascili3es
for
the
Municipal
Police
Departments,
Municipal
Emergency
Management
 Agency
and
Medical
Emergency
911
Office.
 The
construc3on
of
the
new
offices
for
the
Director
and
other
execu3ves
of
the
Public
Works
Department
with
 an
ample
parking
space.

The
fascilli3es
will
include
the
workshops
for
the
repairment
of
all
municipal
vehicles.













5,000,000


60

Juana
Diaz

PR

Transit

Construc3on
of
bridge
over
PR‐149
Street
to
improve
the
service
level
and
traffic
of
PR‐14
and
PR‐149











15,000,000


100

Juana
Diaz

PR

Transit

Construc3on
of
connector
from
PR‐143
to
PR‐512
and
improvements
with
an
approximate
2,500
meters











10,000,000


200

Juana
Diaz

PR

Water

The
construcc3on
of
open
channel
on
aproximatelly
4
kilometers
of
the
Jacaguas
Pluvial
System.












3,000,000


60

Juana
Diaz

PR

Water












4,000,000


80

Juana
Diaz

PR

Water

Furnishing
and
installa3on
gravity
PVC
Pipeline,
concrete
manholes
and
sewer
service
connec3on.
Sanitary
 System
for
Lago
Horizonte
and
Olla
Honda
Communi3es
 The
construcc3on
of
open
channel
on
aproximatelly
10
kilometers
of
the
Jacaguas
River.










50,000,000


200

Lares

PR

CDBG












6,000,000


250

Las
Marias

PR

CDBG

Wastewater
sewage
system
for
the
Piletas
and
Callejones
wards.
It
will
benefit
2,103
households
and
500
 commercial
and
small
business
entrepeneurs. Construc3on
of
sports
complex
to
provide
facili3es
to
townwide
popula3on.












1,900,000


53

Las
Marias

PR

CDBG












5,000,000


100

Las
Marias

PR

CDBG

Rehabilita3on
of
energy
and
communica3on
lines
within
the
town's
urban
core
including
installa3on
of
 photovoltaic
luminaries,
and
streets
and
sidewalks
expansion. Construc3on
of
new
plaza
at
the
urban
core
to
serve
commerce
and
office
space
created
in
the
area.












2,000,000


105

Las
Marias

PR

CDBG

Las
Marias

PR

CDBG

Las
Marias

PR

CDBG

Las
Marias

PR

CDBG

Las
Marias

PR

CDBG

Las
Marias

PR

CDBG

Flood
control
project
to
stop
recurrent
flooding
caused
by
Rio
Guanajibo
during
the
hurricane
season.
 Numerous
Presiden3al
disaster
declara3on
have
been
issued
in
the
past
decade.
Project
will
end
heavy
 economic
and
lives
losses. Streets
and
sidewalk
construc3on,
installa3on
of
solar
powered
luminaries,
and
subs3tu3on
of
the
exis3ng
 system
across
the
urban
core. Construc3on
of
parking
building
for
300
vehicles
providing
the
infrastructure
needed
for
the
town
economic
 development.
Project
will
alleviate
traffic
conges3on. Rehabilita3on
of
City
Government
building
and
adjacent
construc3on
of
new
building
to
rent
commercial
 space
to
small
businesses.
Construc3on
of
parking
facili3es
within
the
premises
to
provide
parking
space
to
 poten3al
clients.
Urban
mini‐mall
will
b Crea3on
of
a
revolving
fund
to
finance
ready
to
go
low
income
developments
which
have
not
started
due
to
 lack
of
funding
caused
by
the
financial
crisis.
Financing
will
also
be
available
for
small
businesses,
sustainable
 energy
projects,
and
small
high
te Installa3on
of
solar
pannels
in
all
City
buildings
moving
the
local
government
from
the
use
of
fossil
fuel
energy
 resources
to
sustainable
energy. Construc3on
of
a
rental
housing
facility
for
the
elderly
to
be

operated
under
rental
assistance
programs.
 Project
will
provide
120
housing
units
for
low
income
persons
with
age
from
62
years
old
on.
 Purchase
of
computer
communica3ons
system
in
order
to
connect
community
policing
and
emergency
 vehicles
to
state
and
Federal
public
safety
agencies. Purchase
and
installa3on
of
video
cameras
in
high
crime
areas,
and
purchase
of
communica3on
system
to
 manage
informa3on
received. Purchase
of
vehicles
for
community
policing
and
emergency
services.

Funding
Required

Jobs












4,000,000


100












7,000,000


100












5,000,000


105












2,000,000


150










15,000,000


300












1,500,000


60










12,000,000


153














300,000


10














500,000


15














700,000


25

Construc3on
and
rehab
of
the
local
street
system
to
provide
new
access
to
town
and
commercial
district.
 Construc3on
of
new
bridges
in
the
rural
area
subs3tu3ng
exis3ng
deteriorated
infrastructure. Purchase
of
buses
and
street
cars
to
provide
public
transporta3on.













2,500,000


85














500,000


20

Construc3on
of
new
wastewater
sewer
system
townwide
rehabilita3ng
exis3ng
aging
system
with
recurrent
 overflows. The
construc3on
of
the
new
Historic
Museum
Casa
Zambrana
at
the
Urban
Area.












5,000,000


65












5,000,000


30












2,000,000


40












2,000,000


40












2,000,000


40












2,500,000


50












3,000,000


60










20,000,000


60












5,000,000


150










15,000,000


150










10,000,000


200

New
Mini
Baseball
Stadium
at

RIO
CAÑAS
ABAJO
Ward.Construc3on
af
a
new
mini
baseball
stadium
with
 cafeteria
areas,
communica3on
area,
parking
lot,
and
a
grand
stand
for
500
persons.

 New
Mini
Baseball
Stadium
at
AGUILITA
Ward.
Construc3on
af
a
new
mini
baseball
stadium
with
cafeteria
 areas,
communica3on
area,
parking
lot,
and
a
grand
stand
for
500
persons. New
Reacrea3onal
and
Pasive
Children
Park
El
SUEÑO
DE
LOS
NIÑOS.
The
construc3on
of
a
new
pasive
and
 recrea3onal
park
with
play
ground
equipment
ADA
complain.
New
Gazebos,
Cafeteria,
Kiosks,
and
Parking
Lot.
 Construc3on
of
a
new
atle3c
Track
in
compliance
with
the
American
Amateur
Atle3c
Associa3on

Electronic
library
to
serve
local
student
popula3on.
Lack
of
internet
access
have
become
an
obstacle
to
school
 reten3on
programs
increasing
school
deser3on
rate. Construc3on
of
94
housing
project
for
the
elderly
to
provide
rental
housing
to
underserved
popula3on. Construc3on
of
parking
facili3es
for
400
vehicles
within
the
urban
core.
Project
will
serve
local
residents
and
 visitors
providing
parking
space
in
an
already
crowded
area. Construc3on
of
fine
arts
facili3es
and
adjacent
parking
building. Construc3on
of
day
care
facili3es
for
the
elderly.
New
facili3es
will
provide
medical,
recrea3onal,
and
 nutri3onal
assistance
to
low
income
elderly
individuals
and
families. Construc3on
of
building
to
provide
rental
space
to
state
government
service
programs,
service
office,
and
 small
businesses.
Project
will
bring
economic
development
alterna3ves
to
a
depressed
area.










12,000,000


80










30,000,000


200












3,000,000


60














930,000


125










10,000,000


153












4,750,000


160












3,700,000


175












2,120,000


200












2,720,000


300

City

State

Program

Las
Marias

PR

CDBG

Project
Descrip3on

Las
Marias

PR

Public
Safety

Las
Marias

PR

Streets/Roads

Las
Marias

PR

Streets/Roads

Mana3

PR

CDBG

Mana3

PR

CDBG

Connec3on
of
PR
119
and
urban
area
enhancing
accessibility
to
the
area
bringing
much
needed
road
 infrastructure.

 Construc3onn
of
new
road
and
bridge
to
connect
rural
areas
with
school
and
residen3al
area
in
Las
Marias
 urban
core.
Project
will
reduce
traffic
conges3on
in
the
urban
area
opening
new
access
to
the
City. Construc3on
of
community
services
center
to
provide
assistance
and
access
to
community
programs
to
 underserved
popula3on. Construc3on
of
12
baseball
parks
to
serve
12
communi3es
townwide.

Mana3

PR

CDBG

Construc3on
of
12
basketball
courts
to
serve
12
communi3es
townwide.

Mana3

PR

CDBG

Construc3on
of
2
community
libraries
to
serve
community
schools
popula3on
and
rural
area
families.


Mana3

PR

CDBG

Construc3on
of
community
police
sta3on
at
Boquilla
community
serving
1,400
families.

Mana3

PR

CDBG

Mana3

PR

CDBG

Mana3

PR

Energy

Mana3

PR

Streets/Roads

Mana3

PR

Streets/Roads

Construc3on
of
community
police
sta3on
to
provide
community
policing
services
to
high
crime
rate
area
at
PR
 149. Construc3on
of
conven3on
center
facili3es
to
serve
local
popula3on
providing
space
for
professional
 conven3ons,
industrial
and
commercial
exhibits,
agriculture
and
housing
development
ac3vi3es,
and
 professional
seminaries.
 Installa3on
of
photovoltaic
light
system
from
PR
2
to
downtown
Mana3
thus
reducing
electric
power
 consump3on
streaming
the
City
budget. Construc3on
of
ramp
connec3ng
highway
PR
22
to
secondary
road
PR
686.
This
connec3on
will
increase
 accesibility
to
the
Mana3
metroplex
allevia3ng
transit
in
the
only
2
exis3ng
connectors. Improvements
to
PR
686
to
order
exis3ng
traffic
conges3on
in
the
area.

Mana3

PR

Streets/Roads

Mana3

PR

Streets/Roads

Mana3

PR

Water

Mana3

PR

Mana3

Construc3on
of
new
market
facili3es
to
provide
low
cost
business
space
for
commercial
exchange
of
 agroindustrial
produce.
Project
will
increase
local
trade
and
bring
new
recurrent
income
to
the
City
 government. Acquis3on
of
vehicles
safety
equipment
to
expand
policing
and
emergency
services
to
local
popula3on.

Funding
Required

Jobs












1,575,000


300












1,350,000


125












2,750,000


100












7,000,000


150














200,000


10














600,000


20












1,200,000


20














800,000


20












1,000,000


20












1,000,000


20












4,000,000


52












2,000,000


25












1,700,000


20














500,000


20

Widening
of
PR
670
from
the
Ci3es
of
Mana3
to
Vega
Baja
reducing
commu3ng
3me
between
the
2
areas,
and
 facilita3gn
communica3ons
between
industrial
and
agriculture
development
poles. Widening
of
PR
686
to
PR
2
providing
addi3onal
lanes
to
already
jammed
road.












2,000,000


30












3,000,000


35












1,700,000


10

Water

Construc3on
of
flood
control
project
at
el
Tanque
and
Boquilla
communi3es
to
stop
economic
losses
and
risk
 to
lives
and
property
due
to
recurrent
hurricane
and
storm
heavy
rains. Rehabilita3on
and
subs3tu3on
of
aging
storm
water
sewer
system
in
PR
6042
and
685.












7,000,000


60

PR

Water

Rehabilita3on
and
subs3tu3on
of
aging
storm
water
sewer
system
in
Mana3
urban
core.










11,000,000


200

Mana3

PR

Water










20,000,000


250

Mayaguez

PR

Airport

Construc3on
of
sewer
system
in
Tierras
Nuevas
and
Poniente
wards
providing
services
to
3,000
households,
 businesses
and
industrial
facili3es. New
firefigh3ng
equipment.












1,000,000


20

Mayaguez

PR

Airport

Improvements
to
Airport
access
road.












1,500,000


50

Mayaguez

PR

Airport

Construc3on
of
new
Emergency
and
Fire
figh3ng
facili3es
building












3,000,000


100

Mayaguez

PR

Airport












5,000,000


100

Mayaguez

PR

CDBG










10,000,000


100

Mayaguez

PR

CDBG

Runway
extension
and
other
improvements.

Current
runway
is
5,000
feet
long,
8,000
feet
are
required
along
 with
other
improvements
to
runway. Dredging
of
the
channel
of
the
Port
facili3es
in
order
to
bring
the
depth
from
thrity
one
(31)
to
thirty
five
(35)
 feet,
thus
allowing
larger
vessels
to
visit
our
port.

If
possible,
to
improve
some
of
the
exis3ng
port
favili3es. Parking
facili3es
near
the
center
of
town.












5,000,000


100

Mayaguez

PR

CDBG










10,000,000


150

Mayaguez

PR

CDBG










25,000,000


200

Mayaguez

PR

CDBG










25,000,000


200

Mayaguez

PR

CDBG










10,000,000


200

Mayaguez

PR

CDBG

Low
income
mul3‐family
housing
projects
near
the
center
of
town.

Several
small
projects
are
planned
for
 rundown
loca3ons
around
that
area. Addi3onal
recrea3onal
and
administra3ve
facili3es
for
the
support
of
the
XXI
Central
American
and
Caribbean
 Games
to
be
held
in
Mayaguez
on
July
2010 Construc3on
of
facilil3es
for
the
elderly
combined
with
commercial
area
and
moderate
income
housing
in
a
 downtown
area
under
renova3on. Miscellaneous
downtown
urban
renewal
projects.

Renova3on
of
old
structures
to
meet
current
demand
for
 commercial
as
well
as
moderate
income
housing. Reloca3on
of
aerial
electric
and
other
u3li3es
lines
to
underground
in
downtown
area.










20,000,000


200

Mayaguez

PR

Energy

Conversion
of
Municipal
Offices
from
fluorescent
lamps
to
LED's.














150,000


10

Mayaguez

PR

Energy

Conversion
of
public
parks
and
other
public
facili3es
to
solar/LED
ligh3ng.












5,000,000


20

Mayaguez

PR

Energy

Methane
collec3on
system
for
landfill.












2,000,000


20

Mayaguez

PR

Energy












8,000,000


100

Mayaguez

PR

Streets/Roads












5,000,000


100

Mayaguez

PR

Streets/Roads










10,000,000


150

Mayaguez

PR

Streets/Roads










12,000,000


150

Mayaguez

PR

Streets/Roads

Construc3on
of
the
second
phase
of
a
bicycle
path
along
the
Yaguez
River.

The
first
phase
was
build
a
few
 years
ago,
and
this
second
phase
will
connect
the
center
of
town
with
the
Mayaguez
Bay
and
other
passive
 recrea3onal
facili3es
under
construc3on New
connector
between
Ramon
Emeterio
Betances
Street
and
Hiram
Cabassa
Street.

This
connector
will
 alleviate
traffic
along
the
area. Construc3on
of
a
connector
between
PR‐2
and
PR‐102,
along
Carolina
Street.

This
will
provide
much
needed
 access
to
over
2,000
ci3zens
living
along
PR‐102,
and
an
escape
route
in
case
of
a
tsunami. Extension
of
the
Eudaldo
Baez
Garcia
Boulevard.

First
phase
was
completed
a
number
of
years
ago,
and
will
 serve
to
feed
traffic
into
the
center
of
town
from
the
South. Widening
of
Nenadich
Street.

This
is
one
of
the
City's
main
arteries,
which
currently
has
only
two
lanes.












8,000,000


150

Mayaguez

PR

Streets/Roads










25,000,000


200

Mayaguez

PR

Streets/Roads










13,000,000


200

Mayaguez

PR

Streets/Roads










25,000,000


200

Mayaguez

PR

Streets/Roads










52,000,000


300

Mayaguez

PR

Transit














700,000


10

Mayaguez

PR

Transit












8,000,000


150

Construc3on
of
an
overpass
over
the
intersec3on
between
PR‐2
and
Corazones
Avenue.

This
is
one
of
the
 busiest
intersec3ons
along
PR‐2. Construc3on
of
an
overpass
over
the
intersec3on
of
Duscombe
Ave.
and
PR‐2.

Another
busy
intersec3on
along
 PR‐2. Construc3on
of
an
overpass
over
the
intersec3on
that
provides
the
primary
access
to
the
Mayaguez
Campus
of
 the
University
of
Puerto
Rico
along
PR‐2.

Current
daily
average
traffic
along
this
intersec3on
approaches
 90,000
vehicles.

Current
facili3es
w Construc3on
of
an
overpass
over
the
three
intersec3ons
providing
access
to
the
Mayaguez
Mall
along
PR‐2.

 This
is
one
of
the
main
projects
to
convert
PR‐2
to
an
expressway.

PR‐2
is
the
major
artery
that
crosses
the
city
 of
Mayaguez
from
North
to
South. Acquisi3on
of
four
(4)
:vintage
trolley"
type
buses
for
two
routes
around
the
center
of
town. Acquisi3on
of
twenty
(20)
buses
for
Municipal
Public
Transporta3on
System
that
will
transport
ci3zens
from
 outlying
areas
to
the
center
of
the
town.

Six
(6)
different
routes
are
being
contemplated.

City

State

Program

Mayaguez

PR

Transit

Modify
downtown
streets
to
accommodate
large
capacity
buses
for
an
inter‐city
mass
transit
system.

Project
Descrip3on

Mayaguez

PR

Water

Construc3on
of
ten
(10)
pumping
sta3ons
to
support
the
water
tanks.

Mayaguez

PR

Water

Mayaguez

PR

Water

Construc3on
of
ten
(10)
fresh
water
tanks.

Nearly
seventy
percent
of
the
municipality
is
on
high
ground,
 where
fresh
water
services
is
deficient.

These
tanks
will
be
located
at
selected
sites
around
the
municipality
in
 order
to
ensure
a
con3nuous
fres Improvements
to
sewers
systems
in
the
Rio
Hondo,
Miradero,
La
Salud
and
Buena
Vista
Wards.

Moca

PR

CDBG

Moca

PR

CDBG

Moca

PR

CDBG

Moca

PR

Housing

Moca

PR

Streets/Roads

Moca

PR

Water

Naranjito

PR

CDBG

Naranjito

PR

CDBG

Naranjito

PR

CDBG

Naranjito

PR

Naranjito

Funding
Required Jobs 








40,000,000
 300 












100,000


25












5,000,000


100












8,000,000


100










10,000,000


80












5,000,000


100










10,000,000


100










10,000,000


150












6,000,000


200












1,600,000


150


CONSTRUCTION
OF
BOARDWALK
AND

STAIRS
AT
LAS
LAGRIMAS
SECTOR
NARANJITO
PUERTO
RICO














500,000


25

CONSTRUCTION
PASSIVE
AREA
AT
VICTOR
J
MOLINA
SECTOR
NARANJITO,P.R.














800,000


30

CDBG

COSTRUCTION
CHANNEL
CANALIZATION
NORTH
MUNICIPAL
ROAD
NARANJITO
PUERTO
RICO














600,000


35

PR

CDBG

CHANNEL
CANALIZATION
PHASE
V
AT
RIO
GUADIANA

NARANJITO
PUERTO
RICO












1,800,000


40

Naranjito

PR

CDBG

CONSTRUCTION
OF
SIDEWALKS,CURB
AND
GUTTERS
AT
GEORGETTI
STREET
NARANJITO
PUERTO
RICO












1,800,000


75

Naranjito

PR

CDBG

CONSTRUCTION
OF
OFFICES
URBAN
ZONE
NARANJITO
PUERTO
RICO












3,500,000


100

Naranjito

PR

CDBG

CONSTRUCTION
OF
CITY
HALL
AND
MULTY
STORY
PARKING
AT
URBAN
ZONE
NARANJITO
PUERTO
RICO










10,000,000


150

Pa3llas

PR

CDBG

Rehabilita3on
of
the
old
movie
which
will
be
turned
into
a
new
performing
arts
complex.














800,000


20

Pa3llas

PR

CDBG














500,000


25

Pa3llas

PR

CDBG

Channeliza3on
of
Mamey
Creek
which
splits
in
two
the
urban
area
elimina3ng
poten3al
hazard.
Recent
rains
 flooded
urban
area
damaging
homes
and
commerce.
A
disaster
declara3on
due
to
this
event
was
issued
by
the
 President
of
the
United
States Construc3on
of
a
boardwalk
and
small
business
rental
space
in
Lake
Pa3llas
to
bring
tourist
ac3vity
to
the
area.














600,000


25

Pa3llas

PR

CDBG

Conversion
of
the
City
gym
into
a
conven3on
center
to
house
small
business
and
professional
ac3vi3es.












1,500,000


50

Pa3llas

PR

CDBG

Construc3on
of
sport
arena
to
house
sport
events,
business
and
commercial
exhibits,
and
other
art
events.












1,500,000


75

Pa3llas

PR

CDBG












2,570,000


80

Pa3llas

PR

CDBG














500,000


100

Pa3llas

PR

CDBG












1,000,000


100

Pa3llas

PR

CDBG












1,200,000


112

Pa3llas

PR

CDBG












6,000,000


150

Pa3llas

PR

Water

Ponce

PR

Airport

Expansion
and
rehabilita3on
of
the
power
distribu3on
system
increasing
its
capacity
to
serve
new
business
and
 housing
projects
in
the
center
of
the
urban
area. Construc3on
of
parking
building
for
450
vehicles.
Project
will
facilitate
access
to
poten3al
clients
to
exis3ng
 and
future
small
businesses
in
downtown. Expansion
and
rehabilita3on
of
the
ter3ary
and
secondary
road
system
serving
15,000
residents.
Project
will
 solve
transporta3on
delays
reducing
fuel
expenditure. New
construc3on
of
the
City's
downtown
plaza
serving
visitors
to
ins3tu3onal
offices,
local
commerce,
 downtown
residents. Construc3on
of
an
ins3tu3onal/commercial
building
to
house
rented
governmental
offices
and
new
 commercial
space
in
the
urban
center
of
the
City.
Commercial
area
will
allow
establishment
and
opera3on
new
 small
businesses
crea3ng
new
jobs
opportuni3es Construc3on
of
wastewater
sewage
system
to
serve
100
households
in
Bajos
ward.
Project
will
also
serve
the
 fishermen
and
beach
facili3es. Improvements
to
Mercedita
Airport
to
add
4
new
gates

Ponce

PR

Airport

Ponce

PR

Airport

Ponce

PR

Ponce

Construc3on
of
hotel
and
villas
to
expand
room
offer
in
the
area
providing
facili3es
to
businessmen
and
tourist
 who
visit
the
area. Construc3on
of
an
office/commercial
building
to
provide
rented
office
space
to
state
government
service
office
 and
commercial
space
to
local
business.
Project
will
be
located
in
the
old
town. Crea3on
of
a
revolving
fund
to
provide
financing
to
small
business
and
low
income
housing
devolopment. Construc3on
of
260
rental
housing
units
in
the
City's
urban
area
bringing
new
families
to
live
in
this
area.
This
 housing
project
will
contribute
to
revitalize
the
area. Expansion
to
4
lanes
of
Puerto

Rico
PR
111
to
connect
Moca
with
PR
2
reducing
travel‐3me
within
the
 Aguadilla‐Aguada‐Moca‐San
Sebas3an
MSA. Rehabilita3on
and
expansion
of
water
infrastructure
for
the
communi3es
along
PR
111
serving
1070
families
 and
100
small
business.












1,425,000


50










17,250,000


180

Improvements
to
Mercedita
Airport
to
add
new
cargo
facili3es










30,000,000


313

Extension
of
Mercedita
Airport
Runway
by
an
approximate
length
of
4000
b.










51,022,222


531

CDBG

Acquisi3on
of
two
proper3es
and
road
improvements
in
McManus
St.
to
connect
to
Villa
St.












1,145,000


12

PR

CDBG

Reloca3on
of
the
Calzada
Community
to
the
Southern
Parcels
of
new
PR‐1
reloca3on.












1,125,000


12

Ponce

PR

CDBG

Acquisi3on
and
Environmental
Cleanup
of
Parcels
in
Clausell
Ward














960,000


40

Ponce

PR

CDBG

Improvements
to
Hostos
Street
from
Tourist
Terminal
to
PR‐163
with
an
approximate
length
of
1,950
meters.












4,875,000


51

Ponce

PR

CDBG












5,000,000


52

Ponce

PR

CDBG












5,736,058


60

Ponce

PR

CDBG

Improvements
to
J.
E.
Monagas
Passive
Park
and
addi3on
of
water
recrea3onal
ac3vi3es
and
linear
park
to
 Caribbean
Sea. Acquisi3on
and
construc3on
of
Staging
and
Parking
terminal
fro
ruise
Ships,
with
an
approximate
area
of
9,100
 square
meters Construc3on
of
96
housing
units
in
Clausell
Ward












6,720,000


70

Ponce

PR

CDBG

Rehabilita3on
of
the
Hacienda
Buena
Vista
facili3es












8,000,000


83

Ponce

PR

CDBG

Caja
de
Muertos
Ecological
Hotel
with
60
cabins.












9,000,000


94

Ponce

PR

CDBG

Improvements
to
Tibes
Ceremonial
Park
and
Museum.










10,000,000


104

Ponce

PR

CDBG

Construc3on
of
Housing
units
in
Victoria
St.










11,000,000


115

Ponce

PR

CDBG

Acquisi3on
and
Rehabilita3on
of
Old
Market
Plaza
for
new
housing
units










14,000,000


146

Ponce

PR

CDBG










16,000,000


167

Ponce

PR

CDBG

Rehabilita3on
of
historic
buildings
at
Playa
Ward
in
Bonaire
St.
to
Padre
Noel
St.,
and
from
San
Alfonso
XII
St.
to
 Puerto
Viejo
St. Rehabilita3on
of
the
former
Ponce
Intercon3nental
Hotel
at
El
Vigia
Ward.










16,250,000


169

Ponce

PR

CDBG

Construc3on
of
the
Music
Museum
of
Ponce












1,750,000


182

Ponce

PR

CDBG

Regional
Sports
complex










23,600,000


246

Ponce

PR

CDBG

Construc3on
of
the
new
Calzada
Community










27,500,000


286

Ponce

PR

CDBG

Technological
School
for
the
Southern
Region
of
Puerto
Rico










30,000,000


313

Ponce

PR

CDBG










57,600,000


600

Ponce

PR

Energy

Construc3on
of
new
tourist
wharf
at
Hostos
St.
with
a
total
length
of
1,200
feet
long
by
160
feet
wide,
to
berth
 two
mega
cruise
ships
simultaneously Methane
Gas
Recovery
for
Alterna3ve
Use
at
Ponce
Landfill










10,000,000


104

Ponce

PR

Public
Safety

Closed
Circuit
Cameras
and
Control
Center
for
the
Municipality.












1,500,000


16

City

State

Program

Ponce

PR

Public
Safety

Community
Police
Sta3ons
for
Municipal
Police
at
Tuque
and
Cofo
Laurel
Ward

Project
Descrip3on

Funding
Required 










2,500,000


Jobs 26

Ponce

PR

Public
Safety

Ponce

PR

Public
Safety

Development
of
Tourist
Parcels
in
Esperanza
Ward










24,000,000


250

Headquarters
for
the
Municipal
Police
of
Ponce.










25,000,000


Ponce

PR

260

Streets/Roads

Sidewalks,
curbs,
and
pavement
imrpovements
in
Nueva
Vida
Wards












2,960,000


Ponce

31

PR

Streets/Roads

Reloca3on
of
PR‐1
from
PR‐52
to
PR‐507,
with
an
approximate
length
of
2,500
meters












3,125,000


33

Ponce

PR

Streets/Roads

Improvements
to
PR‐52
exit
to
PR
‐506
at
Cofo
Laurel
Ward
with
an
approximate
length
of
500
meters.












3,500,000


36

Ponce

PR

Streets/Roads

Improvements
to
PR‐10
from
PR‐52
to
PR‐1
with
an
approximate
length
of
2,000
meters












5,000,000


52

Ponce

PR

Streets/Roads












5,750,000


60

Ponce

PR

Streets/Roads












6,250,000


65

Ponce

PR

Streets/Roads












6,500,000


68

Ponce

PR

Streets/Roads

Improvements
to
PR‐2
from
PR‐2R
to
PR‐1
to
eliminate
marginal
streets
and
provide
a
central
turning
lane,
 with
an
approximate
length
of
4,600
meters Improvements
to
PR‐14
Bridge
and
approach
roadway
over
Bucana
River
up
to
PR‐5139,
with
an
approximate
 length
of
960
meters Construc3on
of
4
lane
access
road
to
El
Vigia
Ward
with
an
approximate
length
of
l,400
meters
to
provide
 access
to
La
Cruzeta
del
Vigia,
Cas3llo
Serrales
and
the
former
Intercon3nental
Hotel Widening
of
PR‐14
from
PR‐506
to
PR‐5139
with
an
approximate
length
of
2,675
meters












6,750,000


70

Ponce

PR

Streets/Roads

Ponce

PR

Ponce Ponce












8,000,000


83

Streets/Roads

Acquisi3on
and
construc3on
of
new
access
road
to
Historic
center
of
Ponce,
with
an
approximate
length
of
 3,200
meters. Sidewalks,
curbs,
and
pavement
improvements
in
El
Tuque
Ward.










11,500,000


120

PR

Streets/Roads

Improvements
to
PR‐123
from
PR‐2
to
Hacienda
Buena
Vista
for
an
approximate
length
of
10,000
meters.










12,500,000


130

PR

Streets/Roads










14,500,000


151

Ponce

PR

Streets/Roads










17,500,000


182

Ponce

PR

Streets/Roads

Reversible
Lane
and
widening
of
PR‐52
from
Juana
Diaz
Toll
Sta3on
to
Ponce
Toll
Plaza
with
an
approximate
 length
of
14,500
meters Construc3on
of
connector
from
PR‐9
to
Baramaya
Ave
and
improvements
to
Baramaya
Ave
up
to
PR‐52,
with
 an
approximate
length
of
4,600
meters Improvements
to
PR‐506
from
PR‐52
to
PR‐14
with
an
approximate
length
of
l,700
meters










18,500,000


193

Ponce

PR

Streets/Roads










22,000,000


229

Ponce

PR

Streets/Roads










24,375,000


254

Ponce

PR

Transit

Construc3on
of
new
4
lane
divided
highway
from
PR‐385
to
Baramaya
Ave
and
Las
Americas
Ave.
with
an
 approximate
length
of
8,800
meters Improvements
to
PR‐10
from
PR‐143
to
PR‐14
consis3ng
of
an
addi3onal
lane
and
median
construc3on
for
an
 approximate
length
of
19,500
meters Alterna3ve
Analysis
Studies
for
the
Ponce
transit
System












5,000,000


52

Ponce

PR

Water

Improvements
to
SDEAP‐PUCPR
drinking
water
distribu3on
system












3,300,000


15

Ponce

PR

Water

Sanitary
System
for
the
Eastern
Sector
of
Ponce,
for
Nueva
Vida
Wards.












1,480,000


15

Ponce

PR

Water

Sanitary
system
for
the
Eastern
Sector
of
Ponce,
for
El
Tuque
Wards.












5,750,000


60

Salinas

PR

CDBG












6,700,000


100

Salinas

PR

CDBG










12,000,000


100

Salinas

PR

CDBG

Construc3on
and
rehabilita3on
of
roads,
streets,
sidewalks
and
streets
intersec3on
in
PR
701.
Construc3on
and
 rehab
of
water
and
wastewater
sewer
system.
Rehabilita3on
of
power
and
communica3ons
systems.
 Installa3on
of
photvoltaic
luminaries.
Proje Construc3on
of
a
124
units
housing
for
the
elderly
project.
Project
will
be
developed
in
City
land
located
in
the
 urban
area
across
the
City
Hall.
It
will
serve
a
popula3on
ranging
from
124
to
248
individuals.
Bringing
new
 residents
to
downtown
district Construc3on
of
2
new
community
service
centers
facili3es
to
assist
a
total
popula3on
of
31,900
residents.












2,000,000


150

Salinas

PR

CDBG










20,000,000


150

Salinas

PR

CDBG












7,000,000


175

Salinas

PR

CDBG










15,000,000


200

Salinas

PR

Energy










15,000,000


100

Salinas

PR

Energy










20,000,000


100

Salinas

PR

Energy












7,000,000


100

Salinas

PR

Energy










15,000,000


150

Salinas

PR

Public
Safety












6,000,000


100

Salinas

PR

Water










22,000,000


150

Salinas

PR

Water










20,000,000


200

San
Juan

PR

CDBG

Rehabilita3on
of
housing
structures
and
infrastructures
in
the
Aguirre
historic
zone
district.
Construc3on
of
 facili3es
to
develop
fishing
industry.
Buildings
rehab
will
provide
commercial
space
crea3ng
new
jobs
for
the
 area.
This
community
encompasse Rehabilita3on
of
school
building
and
construc3on
of
new
structures
to
develop
a
fine
arts
special
public
school.
 Project
will
serve
local
k‐12
popula3on. Crea3on
of
a
revolving
fund
to
finance
small
businesses,
construc3on
of
low
income
housing
projects
(housing
 units
for
sale),
and
rehabilita3on
of
housing
and
commercial
structures. Develop
a
wind
turbine
field
to
provide
energy
to
underserved
low
income
community.
Project
will
benefit
 underserved
300
households.
 Development
of
a
methane
power
genera3on
in
local
landfill.
The
City
would
enter
in
a
joint
venture
with
 private
firm
opera3ng
the
landfill
to
develop
the
methane
plant. Installa3on
of
solar
panels
for
the
produc3on
of
electricity
in
the
City's
public
buildings,
and
moderniza3on
of
 the
energy
distribu3on
system
in
the
urban
area. Installa3on
of
solar
powered
luminaries
in
the
urban
area
and
4
rural
communi3es
serving
5,700
households
 and
businesses. Installa3on
of
computer
and
communica3on
systems
in
local
police
vehicles
and
headquarters
in
order
to
hook
 local
police
with
state
and
Federal
safety
agencies.
Acquisiton
of
new
vehicles
and
installa3on
of
video
systems
 to
expand
service
area.
Recruit Construc3on
of
water
and
wastewater
infrastructure
to
control
overflow
and
flooding
in
2
rural
communi3es
 providing
services
for
1,500
households
and
175
small
businesses.
Channeliza3on
of
creeks
which
flow
within
 the
communi3es. Flood
control
project
in
Rio
Nigua
to
eliminate
recurrent
flooding
ocurring
due
to
hurricane
and
tropical
 systems
heavy
rains.
For
the
past
20
years
5
hurricane
and
tropical
systems
have
affected
the
jurisdic3on
 producing
more
than
$150,000,000
in
econom Construc3on
of
four
(4)
new
Head
Start
facili3es.












6,000,000


20

San
Juan

PR

CDBG

Development
of
an
Equestrian
Park












8,000,000


20

San
Juan

PR

CDBG

Development
of
Veterans'
House










10,000,000


20

San
Juan

PR

CDBG

Improvement
to
the
Roberto
Clemente
Coliseum












8,000,000


20

San
Juan

PR

CDBG

Ar3san
Marketplace














400,000


30

San
Juan

PR

CDBG

Channeliza3on
of
river
and
creeks










18,000,000


30

San
Juan

PR

CDBG

Improvements
to
city
parks
and
recrea3onal
facili3es










10,000,000


50

San
Juan

PR

CDBG

Fishing
village
(La
Pun3lla)












5,000,000


80

San
Juan

PR

CDBG

San
Juan
Municipal
Cemetery
Facili3es










25,000,000


115

San
Juan

PR

CDBG

Rio
Piedras
Lineal
Park










12,000,000


120

San
Juan

PR

CDBG










14,000,000


200

San
Juan

PR

CDBG

Construc3on
of
a
New
Central
market
at
Bechara
Industrial
Park
for
local
and
interna3onal
distribu3on
of
 agricultural
products
(San
Juan
Brand) Construc3on
of
five
(5)
Health
Centers
specialized
in
Urology,
Cancer
Treatment,
Leukemia,
HIV
Treatment,
 Alzheimer.










10,000,000


250

City

State

Program

San
Juan

PR

CDBG

Improvements
to
Sport
Center
and
Parking
Facili3es

Project
Descrip3on

San
Juan

PR

CDBG

Landfill
redevelopment










28,000,000


300

San
Juan

PR

CDBG

Development
of
the
Mar3n
Peña
Channel,
including
demoli3on
and
reloca3on.










75,000,000


1500

San
Juan

PR

Energy

Development
of
a
compressed
Gas
Plant












4,000,000


35

San
Juan

PR

Energy

Installa3on
of
solar
panels
and
energy
systems
on
four
(4)
public
facili3es












4,000,000


50

San
Juan

PR

Energy

Provide
grants
to
homeowners
to
perform
energy
efficiency
retrofits












4,000,000


100

San
Juan

PR

Energy

Development
of
a
Waste‐to‐Energy
Plan








250,000,000


300

San
Juan

PR

Housing

Development
of
Public
Housing
for
the
Elderly










20,000,000


40

San
Juan

PR

Public
Safety

Acquisi3on
of
equipment
for
the
Marine
Unit
of
the
Municipal
Police.












2,000,000


12

San
Juan

PR

Public
Safety

Acquisi3on
of
equipment
and
computers
to
support
crime
inves3ga3on












2,500,000


50

San
Juan

PR

Public
Safety

Establishing
a
Municipal
Fire
Department










10,000,000


100

San
Juan

PR

Schools

Development
of
an
Au3sm
School












5,000,000


10

San
Juan

PR

Schools

Development
of
sports
facili3es
at
the
San
Juan
School
of
Athle3cs












5,000,000


50

San
Juan

PR

Streets/Roads

Access
to
Bechara
Industrial
Park










10,000,000


95

San
Juan

PR

Streets/Roads

Improvement
to
historic
Old
San
Juan
streets
and
sidewalks










48,000,000


225

San
Juan

PR

Streets/Roads

Improvements
to
Roosevelt
and
DeDiego
Avenues










25,000,000


230

San
Juan

PR

Streets/Roads








110,000,000


850

San
Juan

PR

Transit

Construc3on
and
reconstruc3on
of
rural
roads
and
bridges;
asphalt
roads,
sidewalks
and
municipal
streets
and
 urban
streets
and
avenues. Comple3on
of
the
urban
light
train
system
from
Hato
Rey
to
Old
San
Juan








250,000,000


1500

San
Juan

PR

Water

Rehabilita3on
of
city‐wide
sewer
and
sanitary
system










20,000,000


100

Utuado

PR

CDBG

Construc3on
of
a
15
rooms
hotel
development
within
the
old
town
district.












5,000,000


25

Utuado

PR

CDBG












3,500,000


50

Utuado

PR

CDBG

Construc3on
of
wastewater
sewage
system
to
serv
1060
households,
the
University
of
Puerto
Rico
Utuado
 Precinct,
and
public
high
school
Inocencio
Montero. Construc3on
of
new
sport
arena
to
house
sports
events,
conven3ons
and
art
events.










15,000,000


95

Utuado

PR

CDBG










15,000,000


175

Utuado

PR

Housing












8,000,000


150

Yauco

PR

CDBG












3,000,000


30

Yauco

PR

CDBG












3,000,000


30

Yauco

PR

CDBG












2,500,000


40

Yauco

PR

CDBG












3,000,000


50

Yauco

PR

CDBG

Construc3on
of
a
building
complex
within
the
old
town's
district
to
provide
rented
facili3es
to
the
University
 del
Este. Construc3on
of
a
60
units
rental
housing
development
to
bring
new
families
to
live
within
the
old
urban
 district. Design
and
Construc3on
of
Yauco
Mul3purpose
Community
and
Entertainment
Center.
The
project
consists
of
 an
area
of
61,
275SF
to
accommodate
3,500
persons.
 The
Municipality
of
Yauco
is
proposing
the
reconstruc3on
and
restora3on
of
building
complex
“Casa
Llinas”.
 The
proposed
project
include
the
rehabilita3on
of
exis3ng
areas
to
be
converted
into
an:
bed
and
breakfast
 (hostal),
electronic
library,

museum Rebuilt
Historic
Building
“Teatro
Ideal”.
Area
10,010sf
(basement,
ground
floor,
&
mezzanine
level),
419
seats
at
 Yauco
Downtown
area.




 Construc3on
of
Yauco
Urban
Park,
located
on
a
municipal
parcel.
The
total
area
for
the
park
is
composed
of
2
 parcels
divided
by
PR‐368,
with
approximately
24
acres
to
include;
pedestrian
track
&
field,
pond,
acous3c
 open
air
stage,
landscaping,
playgrou Design
&
Construc3on
of
an
extension
of
City
Hall
Administra3ve
Building












5,000,000


75

Yauco

PR

Energy

Conver3on
of
Gasoline
and
Diesel
Municipal

Vehicles
to
Propane
Gas

Energy
save
system.
















500,000


8

Yauco

PR

Energy

Conver3on
of
Municipal
Offices
from
flurecent
lamps
to
LED's














150,000


10

Yauco

PR

Energy

Conver3on
of
public
parks
and
others
facili3es
to
solar/LED
ligh3ng












2,000,000


20

Yauco

PR

Housing












1,000,000


15

Yauco

PR

Public
Safety

Construc3on
of
20
housing
units
at
Bda.
Galarza's
Sector
at
Pueblo
Norte's
Ward,
Nueva
Vida's
Sector
at
 Palomas
Ward,
El
Pozo
Sector
at
Pueblo
Norte's
Ward,
Santo
Domingo's
Sector
at
Pueblo's
Sur
Ward.


 Acquisi3on
of
3
police
cars
to
support
law
enforcement
personnel.















150,000


6

Yauco

PR

Public
Safety

Closed
circut
camaras
and
Control
center
for
the
Municipality.












1,500,000


18

Yauco

PR

Public
Safety












8,000,000


100

Yauco

PR

Streets/Roads














500,000


25

Yauco

PR

Transit














500,000


10

Yauco

PR

Transit

Construc3on
and
removal
of
the
urban
center
at
the
downtown
area
to
implement
economic
development
 ini3a3ves.
 Replacement
of
exis3ng
bridge
over
Yauco
River,
State
Road
PR‐3335,
at
Barinas
Community,
Yauco.
Length:
30
 meters
span,
width
23.5b. Construc3on
of
Public
Transit
Terminal.
Area
of
19,824sf,
2
story
public
cars
terminal
building
with
accesory
 facili3es:
administra3ve
ofices,
retail
areas,
and
bathrooms.



 Pavement
of
4,
326,.92
meters
at
Algarrobos
Ward,
Diego
Hernandez
Ward,
Frailes
Ward,
and
Quebradas
Ward

Yauco

PR

Water

Construc3on
and
Improvements
of
Storm
Water
Systems
of
Downtown
of
Downtown
Area

Pawtucket

RI

CDBG

Pawtucket

RI

CDBG

Pawtucket

RI

CDBG

Pawtucket

RI

CDBG

Friendship
Garden
Restora3on:
this
project
would
restore
the
garden
in
the
City
‘s
largest
park
The
walls
in
 certain
areas
of
the
garden
have
collapsed
and
need
to
be
rebuilt.
The
project
would
also
remove
the
invasive
 species
that
have
overgrown
the
wat Jenks
Junior
High
School
Court
Replacement.
This
1975
built
school
complex
has
two
basketball
courts
and
two
 tennis
courts.
These
30
year
old
courts
are
in
desperate
need
of
replacement.
This
project
would
construct
two
 new
tennis
courts,
a
new
basketball
court Track
and
Field
Turf
Field
‐

Max
Read
Field

is
a
combina3on
Football/Soccer
Field
and
a
Track.
The
facility
(the
 track
especially)
need
to
be
enlarged
to
meet
the
current
RI
interscholos3c
standards.
The
work
will
involve
the
 complete
reconstruc3on Town
Landing
Park
Development:
This
project
will
provide
new
public
access
and
docking
facili3es
along
the
 City’s
waterfront
to
promote
recrea3onal
and
tourist
use
of
the
City’s
waterfront.


Pawtucket

RI

Streets/Roads

Pawtucket

RI

Streets/Roads

Storm
Water
Reten3on
:
a).
Armis3ce
Boulevard
b).
Columbus
Avenue
This
project
will
provide
for
the
 installa3on
of
two
storm
water
reten3on
facility
to
prevent
flooding
in
two
roadways
in
the
City.Both
ares
that
 flood
in
every
major
storm
event
a Storm
Water
Rrten3on
Project
a)
Armis3ce
Boulvard
b)
Columbus
Avenue.
These
two
main
raod
each
have
an
 area
the
constantly
floods
in
heavy
rain
storms.
Both
of
the
ares
floded
are
on
the
route
to
the
only
hospital
in
 the
City.
this
flodding
delays
respo

Funding
Required 






180,000,000


Jobs 300














400,000


20












2,000,000


40














250,000


25














500,000


25












2,000,000


40












1,200,000


50














150,000


25














150,000


25

City

State

Program

Pawtucket

RI

Streets/Roads

Pawtucket

RI

Streets/Roads

Pawtucket

RI

Water

Providence

RI

Providence

Project
Descrip3on

Funding
Required

Jobs

Amtrak

Cole
Street
Bridge
Replacement.
The
closed
bridge
over
the
AMTRAK
main
line
has
been
designed
and
is
being
 permifed.
The
replacement
of
this
bridge
will
provide
another
connec3on
between
Pawtucket
and
the
 neighboring
City
of
Afleboro
MA. Gateway
Roadway
Improvement
Projects:
a)
Mineral
Spring
Avenue
b)Columbus
Avenue
c)
Cofage
Street
d)
 Beverage
Hill
Avenue.
This
project
will
repave
all
of
these
main
aterials
in
the
City
providing
not
only
new
 roadway
surfacing
but
reseqng
curbing,
rep Coats
and
Clark
Infrastructure
improvements.
This
2
million
square
foot
Na3onal
Registor
Mill
complex
is
over
 50%
vacant.
A
developer
has
acquired
1
million
square
feet
and
is
ready
to
start
rehabing
the
buildings
.
The
 water
and
sewer
lines
however
have Parking
Facility
Renova3on












2,000,000


80

RI

Amtrak

Rehabilita3on
of
Train
Sta3on










20,000,000


200

Providence

RI

CDBG

Economic
Development
Interim
Capital
for
Small
Employers
seeking
revolving
credit












5,000,000


Providence

RI

CDBG

Incubator
fund
–
technology
and
knowledge
based
businesses












5,000,000


Providence

RI

CDBG












7,500,000


Providence

RI

CDBG

Providence
Economic
development
–
recapitalize
sec3on
108
loan
program
–
for
small
businesses
and
large
 projects Esek
Hopkins
Homestead
Improvements














650,000


26

Providence

RI

CDBG

Dredging
the
Woonasquatucket
and
Providence
Rivers












2,500,000


75

Providence

RI

CDBG

Soccer
Field
Improvements












2,000,000


80

Providence

RI

CDBG

Roger
Williams
Park
Zoo
‐
Polar
Bear
Exhibit












4,800,000


192

Providence

RI

CDBG

Community
centers
–
major
renova3on
work












8,500,000


200

Providence

RI

CDBG

Housing
improvements
‐
Olneyville,
Trinity
Gateway
and
Housing
projects












7,000,000


200

Providence

RI

CDBG

Recrea3on
center
renova3ons












5,000,000


200

Providence

RI

CDBG

Rehab
to
city
fire
sta3ons
and
construc3on
of
new
fire
training
facility










20,000,000


200

Providence

RI

CDBG

Non‐Profit
Facili3es
Renova3ons
and
Addi3onal
Funding












8,000,000


300

Providence

RI

CDBG

Trinity
Academy
Prep
School
‐
rehabilita3on
of
community
center
and
theater
into
charter
school










10,000,000


300

Providence

RI

CDBG












8,000,000


400

Providence

RI

CDBG

Public
Works
Projects
(Manton
Avenue,
Westminster/Broadway,
Streets
and
Sidewalks
to
support
housing
 developments,
projects
in
low/mod
areas) Center
for
the
Study
and
Prac3ce
of
Non‐Violence
Headquarters
and
Youth
Center












2,500,000


440

Providence

RI

Energy

60,000
Single
stream
recycling
collec3on
containers












3,000,000


0

Providence

RI

Energy

Sidewalk
Tree
Plan3ng
‐
1600
Trees














700,000


10

Providence

RI

Energy

Fire
Dept.
‐
Replacement
of
Hea3ng
Systems














500,000


15

Providence

RI

Energy

Fire
Dept.
‐
Energy
Saving
windows














500,000


20

Providence

RI

Energy

Botanical
Center
Educa3on
Center












1,200,000


48

Providence

RI

Energy

City
Hall
Energy
Retrofiqng
and
Repairs












5,000,000


50

Providence

RI

Energy

Roger
Williams
Park
Buildings
Retrofiqng
and
Renova3ons












2,300,000


92

Providence

RI

Energy

3
1500kW
Wind
Turbines
at
Fields
Point










12,700,000


100

Providence

RI

Energy

Installing
solar‐thermal
for
City
buildings












5,000,000


100

Providence

RI

Energy

Energy
Conserva3on,
renewable
resources,
retro‐fiqng
public
facili3es












5,000,000


200

Providence

RI

Energy

Public
Works
Opera3on
and
Transfer
Sta3on










30,000,000


250

Providence

RI

Housing

Improving
internal
fire
alarm
systems












1,000,000


Providence

RI

Housing

Gymnasium
at
Harzord
Park
‐
Providence
Housing
Authority












2,000,000


105

Providence

RI

Housing










22,000,000


200

Providence

RI

Public
Safety

Providence

RI

Public
Safety

Renova3ons
at
14
sites
including
HVAC,
roofing,
sidewalks,
ligh3ng,
re‐piping,
new
bathrooms
and
kitchens
and
 other
infrastructure
and
technology
improvements Providence
Police
Department
as
a
“Teaching
Police
Department”
Ini3a3ve
–
intent
is
to
apply
the
teaching
 hospital
model
to
advancing
policing
as
a
profession.


The
partnership
will
provide
a
unique
opportunity
to
 learn
how
other
disciplines
evolved
 An3‐Gang
Unit
Expansion
ini3a3ve














300,000


0

Providence

RI

Public
Safety

Citywide
Drug
Market
Interven3on
Ini3a3ve














850,000


0

Providence

RI

Public
Safety

Gun
Task
Force
expansion
ini3a3ve














600,000


0

Providence

RI

Public
Safety

Shotspofer
Gun
Blast
Detec3on
system














425,000


0

Providence

RI

Public
Safety

Specialized
In‐service
training
‐
8
hours
on
such
topics
as
cyber
crimes,
technology,
etc














158,080


0

Providence

RI

Public
Safety

Video
Conferencing
System
for
substa3on
communica3on
and
long
distance
learning

Providence Providence Providence

RI RI RI

Public
Safety Schools Schools

Emergency
Opera3ons
Center
‐
Phase
II George
J.
West
Elementary
Renova3on Samuel
Bridgham
Middle
School
Renova3on

Providence

RI

Schools

Mount
Pleasant
High
School
renova3on










90,000,000
 185.5

Providence

RI

Schools

Warm,
Safe,
and
Dry
School
Program










40,000,000


200

Providence

RI

Streets/Roads

Replace
deck
on
Atwells
Ave
Bridge
over
Woonasquatucket
River














750,000


15

Providence

RI

Streets/Roads

Replace
Tar
Bridge
carrying
Manton
Ave
over
Woonasquatucket
River














750,000


15

Providence

RI

Streets/Roads

Roger
Williams
Park
bridge
repairs














335,000


15

Providence

RI

Streets/Roads

Sidewalk
repairs
in
front
of
fire
sta3ons














250,000


25

Providence

RI

Streets/Roads

Repaving
Bridgham
St.
from
Elmwood
Ave.
to
Westminster
St.














700,000


28

Providence

RI

Streets/Roads

Repave
Thurbers
Ave.
from
Broad
Street
to
Allens
Ave.














750,000


30

Providence

RI

Streets/Roads

ADA
Ramps
for
100‐150
intersec3ons












1,000,000


40

Providence

RI

Streets/Roads

Repave
Branch
Ave.
from
N.
Main
to
Rt.
146












1,000,000


40

Providence

RI

Streets/Roads

Repave
Manton
Ave.
from
Chalkstone
Ave.
to
Aleppo
St.












1,000,000


40

Providence

RI

Streets/Roads

Repave
Valley
Street
from
Pleasant
Valley
Parkway
to
Harzord
Ave.












1,000,000


40

Providence

RI

Streets/Roads

North
Burial
Ground
Road
Improvements












1,100,000


44

Providence

RI

Streets/Roads

Reconfigura3on
of
Emmef
Square












2,500,000


45

Providence

RI

Streets/Roads

Repave
Hope
Street
from
Blackstone
Blvd.
to
5th
Street
and
from
Lloyd
Ave.
to
Wickenden
St.












1,250,000


50

Providence

RI

Streets/Roads

Paving
and
arterial
signals
on
Broadway












1,800,000


72

Providence

RI

Streets/Roads

Hurricane
Barrier
renova3ons
via
Army
Corp












2,500,000


80














500,000


40














500,000


60














750,000


45












5,000,000

















95,000
 0 










2,500,000
 20 








40,000,000
 137.5 








30,000,000
 137.5

City

State

Program

Providence

RI

Streets/Roads

Roger
Williams
Park
Road

Project
Descrip3on

Funding
Required 










3,125,000


Jobs 130

Providence

RI

Streets/Roads

Providence

RI

Streets/Roads

Westminster
Street
‐
sidewalks,
paving
and
street
ligh3ng












4,000,000


160

Sidewalk
repairs
‐
18
miles
replaced
(Could
be
$10M
per
year
for
next
10
years)










10,000,000


Providence

RI

Streets/Roads

Providence

RI

Transit

Reconstruc3on
of: ‐Smithfield
Ave.
from
Nashua
St.
to
I‐95 ‐Atwells
Ave.
from
Broadway
to
area
east
of
Service
Rd. ‐Exchange
Terrace
from
Francis
St.
to
Exchange
St. ‐Hun3ngton
Exp.
from
Hun3ngton
Ave.
to
Magnon
St. ‐Union
Ave.
from
Messer
St.
to Energy
Efficiency
upgrades
at
Providence
RIPTA
facili3es

200












8,300,000


352












1,000,000


Providence

RI

Transit

10












4,000,000


15

Transit

ITS
Development
(including
Customer
Informa3on
Screens,
passenger
info
sobware,
transit
kiosks
for
3cket
 sales,
bus
stop
database,
etc.) Service
Expansion
on
Urban
Routes
(56,
20,
11,
99)
and
addi3onal
suburban
Park
n'
Ride
Lots

Providence

RI












3,000,000


Providence

30

RI

Transit

Capital
Improvements
to
Kennedy
Plaza/RIPTA
hubs
‐
bus
shelters,
renova3ons,
etc












1,000,000


40

Providence

RI

Transit

Downtown
Circulator












1,500,000


150

Providence

RI

Transit










47,000,000


206

Providence

RI

Transit

1000‐Space
structured
parking
facility
to
serve
Garrahy
Judicial
Complex
and
the
reloca3on
of
the
Brown
 University
Medical
Educa3on
Center Streetcar
System










20,000,000


400

Providence

RI

Water

Reconstruc3on
of
wall
along
Scituate
Reservoir
dam,
Phase
2














100,000


4

Providence

RI

Water

20‐inch
Water
Main
Installa3on
in
Western
Cranston
sec3on














225,000


5

Providence

RI

Water

Dean
Estates
Pump
Sta3on
Upgrades












1,000,000


5

Providence

RI

Water

Meter
and
Junc3on
Chambers
Rehabilita3on














500,000


5

Providence

RI

Water

Regula3ng
Reservoir
Dam
Rehabilita3on












1,000,000


5

Providence

RI

Water

Main
replacement
program












3,000,000


10

Providence

RI

Water

Scituate
Avenue
16‐inch
Water
Main
Extension












1,000,000


10

Providence

RI

Water

Lead
service
replacement
program
to
replace
1800
services
per
year
per
EPA










15,000,000


40

Providence

RI

Water

Sanitary
sewer
mapping
and
data
collec3on












1,000,000


40

Providence

RI

Water

Roger
Williams
Park
Lade
Dredging












1,100,000


44

Providence

RI

Water

Police
Firing
Range
reloca3on
from
reservoir










10,000,000


100

Providence

RI

Water

Renova3on
of
the
treatment
plant
filters
and
filter
building










12,000,000


100

Warwick

RI

CDBG

Handicapped
accessible
public
fishing
pier














514,000


12

Warwick

RI

Streets/Roads












1,500,000


20

Warwick

RI

Water

Warwick

RI

Water

Mill
Creek
Bridge
Replacement, Tidewater
Drive,
Warwick,
RI Interconnec3ons
with
Neighboring
 Water
Systems Cleaning
and
relining
of
exis3ng
cast
iron
water
mains

Warwick

RI

Water

Warwick

RI

Water

Warwick

RI

Warwick












1,000,000


8










10,000,000


20

Replacement/Upgrading
of
Exis3ng
Infrastructure










20,000,000


24

Governor
Francis
Phase
II
Sewer
Extension












4,600,000


32

Water

Governor
Francis
Phase
III
Sewer
Extension












4,400,000


32

RI

Water

Bayside
IV/Longmeadow
Sewer
Extension












3,600,000


33

Warwick

RI

Water

Northwest
Gorton
Pond
Sewer
Extension












2,800,000


33

Warwick

RI

Water

Sandy
Lane/Cedar
Swamp
Sewer
Extension












1,600,000


33

Woonsocket

RI

CDBG

Historic
renova3on
of
Hamlet
Guard
House
for
school
use

Woonsocket

RI

CDBG

Woonsocket

RI

Woonsocket

RI

Woonsocket














800,000


50

Flood
Control
System
Improvements
and
Upgrades












3,000,000


150

CDBG

Cass
Park
Improvements












4,450,000


275

CDBG

Street
Reconstruc3on












5,000,000


400

RI

Energy

City‐wide
Energy
Audit/Rehabilita3on:
Solar
Infrastructure














600,000


20

Woonsocket

RI

Energy

Install
solar
panels
at
the
five
fire
sta3ons
for
hea3ng
purposes












1,000,000


20

Woonsocket

RI

Energy

Install
energy
efficient
ligh3ng
and
windows
throughout
the
five
fire
sta3ons












1,200,000


45

Woonsocket

RI

Public
Safety

Technology
and
Facility
Upgrades
at
the
Police
Department












1,000,000


20

Woonsocket

RI

Public
Safety










30,000,000


150

Woonsocket

RI

Schools

Construc3on
of
a
new
Fire
Department
Headquarters,
including
a
City
Hall
annex
for
certain
cri3cal
municipal
 services
(police,
telecommunica3ons,
administra3on)
 Install
New
State‐of‐the‐Art
Educa3onal
Technology
Equipment
at
Two
New
Middle
Schools













1,400,000


100

Woonsocket

RI

Schools

Install
Solar
Panels
at
New
Middle
Schools












1,500,000


100

Woonsocket

RI

Streets/Roads

Bridge
Rehabilita3on
(4)












4,000,000


80

Woonsocket

RI

Water

Line
Rehabilita3ons
‐
Storm
Overflows












1,000,000


20

Woonsocket

RI

Water

Syphon
Upgrades

Woonsocket

RI

Water

Woonsocket

RI

Charleston

SC

Charleston














500,000


20

Upgrade
wastewater
facility
as
per
State
mandate










48,000,000


100

Water

Construc3on
of
new
10.5
million
gallon
drinking
water
facility
(federally‐mandated
project)










35,000,000


150

Airport

Johns
Island
Airport
Apron
Expansion












3,000,000


45

SC

Airport

Airport
Technology
and
Infrastructure












9,300,000


140

Charleston

SC

Amtrak

Northfold
Southern
Tracks
Upgrade
Between
Summerville
and
Charleston
for
Commuter
Rail
SVC










25,230,000


50

Charleston

SC

Amtrak

Rail
Cars
Purchase
for
Commuter
Rail
SVC
from
Summerville
to
Charleston










45,000,000


75

Charleston

SC

Amtrak

Construc3on
N.
Chas.
Intermodal
Center
for
Amtrak
Sta3on












7,800,000


250

Charleston

SC

CDBG

Atructural
Repairs
Parking
Garage
09














275,000


5

Charleston

SC

CDBG

Charleston
Mari3me
Center
Fire
Suppression
System
&
Guardrails














275,000


5

Charleston

SC

CDBG

Police
Substa3on
at
the
Mafress
Factory














495,000


8

Charleston

SC

CDBG

Install
(200)
Bus
Stop
Info
Kiosks














100,000


10

Charleston

SC

CDBG

White
Point
Gardens
Banstand
Renova3on














600,000


11

Charleston

SC

CDBG

Erosion
Control
of
Waterfront
(Two
Loca3ons)












1,100,000


20

Charleston

SC

CDBG

Construc3on
of
(25)
Bus
Shelters
System
‐Wide














625,000


25

Charleston

SC

CDBG

Memminger
Streetscape












1,500,000


26

City

State

Program

Charleston

SC

CDBG

Water
Taxi
Dock
and
Facility

Project
Descrip3on

Funding
Required 










1,500,000


Jobs 26

Charleston

SC

CDBG

Charleston

SC

CDBG

James
Island
Recrea3on
Expansion












1,500,000


27

North
Bridge
Park












1,500,000


Charleston

SC

27

CDBG

Non‐Profit
Incubator












3,000,000


Charleston

28

SC

CDBG

Fire
Sta3on
#
9












1,750,000


31

Charleston

SC

CDBG

White
Point
Gardens
Phase
II












2,000,000


34

Charleston

SC

CDBG

Charlofe
Street
Park












2,100,000


35

Charleston

SC

CDBG

Woodland
Road
Park












2,000,000


35

Charleston

SC

CDBG

Ball
Field
Ligh3ng
at
Six
Loca3ons












2,100,000


37

Charleston

SC

CDBG

Brifle
Bank
Park
Pier
Restora3on
and
Bank
Stabiliza3on












2,500,000


44

Charleston

SC

CDBG

City
of
Charleston
Rosemont
Development












2,000,000


50

Charleston

SC

CDBG

Gilchrist
Proper3es












1,500,000


50

Charleston

SC

CDBG

Elliotborough
Park












3,000,000


51

Charleston

SC

CDBG

Dill
Tract
Park
Development












3,000,000


53

Charleston

SC

CDBG

Waterfront
Park
Restora3on












3,000,000


53

Charleston

SC

CDBG

Stoney
Field
Renova3on












5,000,000


89

Charleston

SC

CDBG

Ladson
House
Redevelopment












2,000,000


100

Charleston

SC

CDBG

Mee3ng
&
Morrison
Street
Revitaliza3on












2,000,000


100

Charleston

SC

CDBG

Concord
Park












6,500,000


111

Charleston

SC

CDBG

Boyer's
Court
&
Indian
Street
Redevelopment












2,000,000


120

Charleston

SC

CDBG

Reuse/Redevelopment












2,000,000


200

Charleston

SC

CDBG

St.
Phillip/Fishburne
Proper3es












2,500,000


200

Charleston

SC

CDBG

West
Ashley
Site












3,000,000


200

Charleston

SC

CDBG

City
Wide
Aqua3c
Facilites
Repairs/Renova3ons










12,000,000


215

Charleston

SC

CDBG

Dill
Tract
Park
Development
Phase
II










18,000,000


242

Charleston

SC

CDBG

Charleston
Development
Academy












3,000,000


250

Charleston

SC

CDBG

CRBN
Infrastructure










16,290,000


255

Charleston

SC

CDBG

St.
Andrews
Garden
Apartments












3,000,000


350

Charleston

SC

CDBG

Johns
Island
Five
Acre
Site












2,750,000


400

Charleston

SC

CDBG

Horizon
Parking
Deck










24,000,000


408

Charleston

SC

CDBG

Ray
Site
on
Johns
Island












2,400,000


660

Charleston

SC

Energy

City
Hall
Geothermal
Expansion












1,000,000


18

Charleston

SC

Energy

Cainhoy
Fire
Sta3on












2,750,000


48

Charleston

SC

Energy

Carolina
Bay
Fire
Sta3on












2,750,000


48

Charleston

SC

Energy

Renova3on
of
116
Mee3ng
Street












3,200,000


57

Charleston

SC

Energy

Replacement
of
Incandescent
Traffic
Signals
with
LED
Technology












5,000,000


75

Charleston

SC

Energy

New
City
Gym












8,900,000


151

Charleston

SC

Energy

Municipal
Building










20,000,000


354

Charleston

SC

Energy

Daniel
Island
Housing
Development












3,000,000


400

Charleston

SC

Energy

City
of
Charleston
Rehabillitaion
of
owner‐occupied
homes.












5,200,000


520

Charleston

SC

Housing

New
Construc3on
of
Affordable
Housing












1,470,000


27

Charleston

SC

Housing

Capital
Reinvestment
II












2,078,575


42

Charleston

SC

Housing

Kiawah
Homes,
Charleston
Peninsula
public
housing
interior
renova3on












2,135,000


67

Charleston

SC

Housing

Capital
Reinvestment












3,785,641


75

Charleston

SC

Public
Safety

Invesi3ga3ve
Analysis
Sobware














150,000


2

Charleston

SC

Public
Safety

Conversion
to
Charleston
County
Digital
Radio
System












1,750,000


4

Charleston

SC

Public
Safety

Flashover
Simulator














100,000


6

Charleston

SC

Public
Safety

DNA
Laboratory












1,370,000


8

Charleston

SC

Public
Safety

IBIS
Lab

Charleston

SC

Public
Safety

Charleston

SC

Charleston

SC

Charleston














497,995


9

Public
Safety
Wi‐Fi
and
Video
Surveillance
System












4,000,000


17

Public
Safety

New
Police
Officers












1,031,116


20

Public
Safety

Public
Safety
Training
Center












2,000,000


31

SC

Schools

Classroom
ligh3ng
improvements
at
12
schools
















62,000


5

Charleston

SC

Schools

Install
Visitor
Management
Systems
at
all
schools
















66,000


5

Charleston

SC

Schools

Security
Ves3bules
Installa3on
at
5
schools
















35,000


5

Charleston

SC

Schools

Energy
Monitoring
and
Control
System
Improvements














140,000


10

Charleston

SC

Schools

Electronic
Access
Controls
Installa3on
at
13
schools

Charleston

SC

Schools

Video
Distribu3on
Upgrades
at
22
schools

Charleston

SC

Schools

Charleston

SC

Charleston














325,000


15












3,300,000


25

Construc3on
of
Perimeter
Fencing
at
10
schools














530,000


30

Schools

Video
Surveillance
Systems
Installa3on
at
14
schools














700,000


35

SC

Schools

Memminger
Elementary
School‐Renovate
the
11
1/2
St.
Phillips
Street
Annex












2,500,000


40

Charleston

SC

Schools

Install
Security
Upgrades
@
14‐schools












1,700,000


80

Charleston

SC

Schools

Technology
Infrastructure
Improvements
at
17
schools












1,230,000


80

Charleston

SC

Schools

Playground
Improvements
at
20
schools












1,450,000


100

Charleston

SC

Schools

Seismic
Repairs
to
the
Courtenay
Campus












7,800,000


120

Charleston

SC

Schools

Burke
High
School
Career
Center












6,000,000


150

Charleston

SC

Schools

CCSD
Emergency
and
Opera3ons
Center










10,500,000


200

Charleston

SC

Schools

Rebuild
and
Expand
Charleston
Montessori
School










18,700,000


280

Charleston

SC

Schools

Classroom
Technology
Moderniza3on
at
30
schools












9,800,000


300

Charleston

SC

Schools

Rebuild
Stono
Park
Elementary
School










26,500,000


400

City

State

Program

Charleston

SC

Schools

Rebuild
Harborview
Elementary
School

Project
Descrip3on

Funding
Required Jobs 








31,500,000
 475

Charleston

SC

Schools

Rebuild
Buist
Academy










34,000,000


500

Charleston

SC

Schools

Rebuild
James
Simons
Elementary
School










33,800,000


500

Charleston

SC

Schools

Rebuild
Memminger
Elementary
School










36,800,000


550

Charleston

SC

Schools

Rebuild
St
Andrews
Elementary
School










37,000,000


555

Charleston

SC

Streets/Roads

West
Ashley
Greenway
Stono
Creek
Bridge
Replacement














400,000


7

Charleston

SC

Streets/Roads

Construc3on
of
Turn
Lanes
at
Glenn
McConnell
Parkway
and
Bairds
Cove














500,000


8

Charleston

SC

Streets/Roads

West
Ashley
Bike
Way
Extension
Pier














800,000


14

Charleston

SC

Streets/Roads

Construc3on
of
Intersec3on
of
Cooper
Street
at
Mee3ng
Street












1,000,000


15

Charleston

SC

Streets/Roads

Ashley
River
Road
Bike/Pedestrian
Path
Extension












1,000,000


18

Charleston

SC

Streets/Roads

Herriot
Street
Crossover
from
King
Street
to
Mee3ng
Street
construc3onand
Railroad
Crossing
Gates












2,000,000


30

Charleston

SC

Streets/Roads

Maybank
Highway
at
Riverland
Drive
construc3on
of
Turn
Lanes












3,000,000


45

Charleston

SC

Streets/Roads

Highway
61
Moreland
Pedestrian
Safety
Improvements
and
Reconstruc3on












4,000,000


60

Charleston

SC

Streets/Roads

Courtenay
Drive/Bee
Street
Highway
Improvements












5,000,000


75

Charleston

SC

Streets/Roads

Ashley
River
Walk
Connec3on












5,000,000


85

Charleston

SC

Streets/Roads

Spring/Cannon
Streetscape
2‐Way
Conversion












6,300,000


95

Charleston

SC

Streets/Roads

Mee3ng
Street‐Morrison
Drive
Connector
Road
in
Downtown
Charleston












7,000,000


105

Charleston

SC

Streets/Roads

US
17
North
Bike/Pedestrain
Retrofit
Project












8,000,000


120

Charleston

SC

Streets/Roads












8,000,000


120

Charleston

SC

Streets/Roads

Wappoo
Cut
Bridge
Bicycle/Predestrian
Retrofit
Project
&
Construc3on
of
Sidewalks
Leading
to
and
from
the
 Bridge Highway
7
at
Highway
171
Intersec3on
Reconstruc3on
and
Pedestrian
Improvements












8,500,000


128

Charleston

SC

Streets/Roads

World
War
II
Memorial
Bridge
Retrofit
Project
(Northbridge)












9,300,000


140

Charleston

SC

Streets/Roads

Construc3on
of
Interchange/Circle
of
Glenn
McConnell
Parkway
and
Bees
Ferry
Road










13,000,000


195

Charleston

SC

Streets/Roads

Huger
Street
Reconstruc3on
and
Construc3on
of
Sidewalks










14,000,000


210

Charleston

SC

Streets/Roads

SC
7
at
61
Intersec3on
Reconstruc3on
and
Pedestrain
Improvements










14,000,000


210

Charleston

SC

Streets/Roads

Glenn
McConnell
Parkway/Paul
Cantrell
Blvd.
Highway
Widening
and
Interchange
with
Interstate
526










15,000,000


225

Charleston

SC

Streets/Roads

James
Island
Creek
Bridge
Replacement
and
Harbor
View
Road
Widening‐Phase
II










15,000,000


225

Charleston

SC

Streets/Roads

Bees
Ferry
Road
Infrastructure
Improvement










20,000,000


300

Charleston

SC

Streets/Roads

Calhoun
Street
and
Courtenay
Drive
Intersec3on
Reconstruc3on
and
Pedestrian
Bridge










20,000,000


300

Charleston

SC

Streets/Roads

James
Island
Highway
Improvement
Project










20,000,000


300

Charleston

SC

Streets/Roads

Maybank
Highway
Local
Roadway
Network










20,000,000


300

Charleston

SC

Streets/Roads

SC
171
(Wesley
Dr.)
Highway
Improvements
and
Greenway
Bridge










20,000,000


300

Charleston

SC

Streets/Roads

Morrison
Drive
Reconstruc3on










25,000,000


375

Charleston

SC

Streets/Roads

Reconstruc3on
of
King
and
Mee3ng
Street
North










35,000,000


525

Charleston

SC

Streets/Roads

John's
Island
Road
Improvements










45,000,000


675

Charleston

SC

Transit

Maintenance
Facility
Upgrade












1,000,000


25

Charleston

SC

Transit

Transit
Coaches
Replacement
(36)










10,800,000


100

Charleston

SC

Water

Playground
Road
Pump
Sta3on
Replacement
Design














400,000


6

Charleston

SC

Water

Wagner
Terrace
Storm
Drain
Rehabilita3on














440,000


6

Charleston

SC

Water

West
Ashley
Sewer
Tunnel
Replacement
Study














440,000


6

Charleston

SC

Water

Ashe
Street
Water
Line
Replacement‐Line
to
Spring
Street














273,125


7

Charleston

SC

Water

Ashley
Avenue
Water
Line
Replacement‐Cannon
To
Calhoun
Street














575,000


7

Charleston

SC

Water

Calhoun
Street
Water
Line
Replacement‐Pif
to
Anson
Street














874,000


7

Charleston

SC

Water

Church
Street
Water
Line
Replacement‐Tradd
to
South
Market
Street














632,500


7

Charleston

SC

Water

Drake
Street
Water
Line
Replacement‐Columbus
to
South
Street














379,500


7

Charleston

SC

Water

East
Bay
Street
Water
Line
Replacement‐Cooper
to
Chapel
Street














862,500


7

Charleston

SC

Water

George
Street
Water
Line
Replacement‐St.
Philip
to
Coming
Street














189,750


7

Charleston

SC

Water

Glebe
Street
Water
Line
Replacement‐George
to
Wentworth
Street














205,563


7

Charleston

SC

Water

Hutson
Street
Water
Line
Replacement














201,250


7

Charleston

SC

Water

Line
Street
Water
Line
Replacement‐Mee3ng
Street
to
Hanover
Street














215,625


7

Charleston

SC

Water

Line
Street
Water
Line
Replacement‐President
to
King
Street














920,000


7

Charleston

SC

Water

Percy
Street
Water
Line
Replacement‐Line
to
Spring
Street














273,125


7

Charleston

SC

Water

Prioeau
Street
Water
Main
Replacement














316,250


7

Charleston

SC

Water

Queen
Street
Water
Line
Replacement‐Franklin
to
Kng
Street














408,250


7

Charleston

SC

Water

Reid
Street
Water
Line
Replacement‐Nassau
to
East
Bay
Street














465,750


7

Charleston

SC

Water

Short
Street
Water
Line
Replacement‐
Franklin
to
Logan
Street














132,250


7

Charleston

SC

Water

South
Street
Water
Line
Replacement‐Nassau
to
Drake
Street














362,250


7

Charleston

SC

Water

Stocker
Drive
Water
Main
Replacement














267,700


7

Charleston

SC

Water

Lower
Folly
Road
Water
Main
Replacement














625,000


8

Charleston

SC

Water

Bereford
Commercial
Sewer
Trunk
Main
Extension














190,800


10

Charleston

SC

Water

Coming
Street
Water
Line
Replacement‐Vanderhorst
to
Beaufain














790,625


11

Charleston

SC

Water

Johns
Island
Sewer
Extension‐Sailfish
to
Maybank
Highway














820,000


11

Charleston

SC

Water

Pump
Sta3on
Rehabilita3on
Project
Phase
1














986,000


13

Charleston

SC

Water

Sewer
Collec3on
System
Rehabilita3on
Phase
1














583,000


13

Charleston

SC

Water

Pif
Street
Water
Main
Replacement












1,220,000


16

Charleston

SC

Water

Spring
Street
Water
Lline
Replacement‐Hagood
to
Mee3ng
Street












1,523,750


21

Charleston

SC

Water

America
Street
Water
Main
Replacement












2,585,000


36

Charleston

SC

Water

Pump
Sta3on
84
Upgrade












3,035,700


42

Charleston

SC

Water

Seawall
Rehabilita3on‐Phase
1












3,000,000


42

Charleston

SC

Water

Johns
Island
Sewer
Interceptor
Extension
Phase
1












3,372,000


47

City

State

Program

Charleston

SC

Water

Brick
Arch
Rehabilita3on

Project
Descrip3on

Funding
Required 










5,000,000


Jobs 70

Charleston

SC

Water

Charleston

SC

Water

Peninsula
Trunk
Main‐Phase
1A










16,407,338


230

Market
Street
Drainage
Improvement










30,000,000


Charleston

SC

420

Water

Spring/Fishburne/Hwy
17
Drainage
Improvement
Project
Phase
I










60,000,000


Columbia

840

SC

Airport

Install
New
Perimeter
Security
Fencing














657,548


20

Columbia

SC

Airport

Construct
New
U3li3es
and
Service
Road
to
West
Cargo
Area












1,135,387


30

Columbia

SC

Airport

Rehabilitate
Airport
Perimeter
Roads
(East
Side)












2,493,750


30

Columbia

SC

Airport

Rehabilitate
Airport
Perimeter
Roads
(West
Side)












3,649,525


35

Columbia

SC

Airport

Residen3al
Sound
Insula3on
Project
–
Phase
2












1,225,000


40

Columbia

SC

Airport

Construct
New
Stub
Taxiway












2,424,723


55

Columbia

SC

Airport

Rehab
Taxiways
“GG”,
“HH”
and
“N”












1,153,924


55

Columbia

SC

Airport

Runway
11/29
Keel
Sec3on
Reconstruc3on










13,694,387


85

Columbia

SC

CDBG

Water
and
Shaw
Streets
Redev.
















70,000


5

Columbia

SC

CDBG

Bethel
Bishop
Chappelle
Community
Center.














333,000


25

Columbia

SC

CDBG

Burton
Hgts.
Neighborhood
Redevelopment
Community
Center
‐

Low
Income
Census
Tract.














500,000


50

Columbia

SC

CDBG














500,000


50

Columbia

SC

CDBG

City
of
Columbia
Homeless
Shelter
Facility
Improvements
‐
Road
Construc3on
of

½
Mile
Facility
 Improvements. South
Edisto
Park
‐
Rosewood
Low
Income
Census
Tract
Neighborhood
S.
Edisto
Ave.

Columbia

SC

CDBG

Columbia

SC

Columbia

SC

Columbia














500,000


50

Village
at
Rivers
Edge
Infrastructure.












2,000,000


100

CDBG

Assisted
Living
Housing
Facility
for
Disabled
Low
Income
Census
tract
Neighborhood


25
Units.












3,750,000


125

CDBG

Columbia
Housing
Development
Corp.
BridgePointe
Infrastructure.












4,500,000


200

SC

CDBG










20,000,000


500

Columbia

SC

Energy

City
of
Columbia
Comprehensive
Parks
Renewal
Project
for
the
Benefit
of
Low
Income
Census
Tract
 Neighborhoods.
Rosewood
Parks,
Earlewood
Parks,
Finlay
Park,
Hyaf
Park,
Drew
Park,
Greenview
Park. Projected
annual
energy
savings
$244,247

Columbia

SC

Energy

Build‐out
of
hydrogen
fueling
sta3on
with
natural
gas
fueling
capacity












2,500,000


5

Columbia

SC

Energy

Columbia

SC

Energy

Convert
3‐way
Valves
to
2‐way
w/VSD
Pumping
at
Washington
Square
Administra3on
Building The
project
proposes
to
replace
the
3‐way
chilled
water
valves
with
new
2‐way
control
vales
and
installing
 Variable
Frequency
Drive
on
the
chilled
water
circula3on Installa3on
of
on‐site
hydrogen
back0up
power
systems
for
area
cell
towers.

Columbia

SC

Energy

Installa3on
of
on‐site
hydrogen
dispensers
for
fork‐lib
hydrogen
bafery
applica3ons.

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Energy

Columbia

SC

Housing

Upgrade
Elevators
at
Washington
Square
Administra3on
building The
project
proposes
to
modernize
and
improve
the
opera3ons
of
three
elevators.
The
building
is
used
as
an
 administra3on
building
where
the
Public
has
access
to
pay
u3li3es
bills,
license Photovoltaic
Electric
Power
Genera3on
at
Fire
Sta3ons
 The
project
proposes
to
install
a
solar
photovoltaic
electric
power
system
at
each
Fire
Sta3on.
The
system
will
 provide
1.0kilowaf
of
electricity
to
power
120‐volt
electric
loads.
Projected
annua Ligh3ng
System
Improvements:The
project
proposes
to
install
new
ligh3ng
systemsthat
will
provide
a
high
 quality
visual
environment
that
is
energy
efficient,
low
maintenance,
and
cost
effec3ve.
Exis3ng
T12
ligh3ng
 systems
will
be
replaced
with
new
T8 Energy
Management
System/
Controls
Upgrade.
The
project
proposes
to
install
new
Energy
Management
 Systems
and
modify
exis3ng
EMS
in
facili3es
throughout
the
City.
Projected
annual
energy
savings
$44,809 HVAC
Equipment
Upgrades The
project
proposes
to
replace
exis3ng
units
with
like
type
energy
efficient
heat
pumps
in
Park
and
Recrea3on
 Buildings
and
Fire
Sta3ons.
Projected
annual
energy
savings
$34,147 New
HVAC
System
at
City
Hall The
project
proposes
to
replace
the
water
cooled
system
and
split
system
AC
units

and
the
associated
steam
 boiler
and
cooling
tower

with
a
variable
refrigerant
flow
zoning
system.
The
system
will
provide
simultaneous
 hea3n Photovoltaic
Electric
Power
Genera3on‐
Parking
Garages The
project
proposes
to
retrofit
exis3ng
parking
garages
with
a
combina3on
of
photovoltaic
arrays
and
light‐ emiqng
diode
ligh3ng
fixtures.
Projected
annual
savings
$31,688 Broad
River
Terrace
Affordable
Housing
Community.

Columbia

SC

Housing

Redevelopment
of
La3mar
Manor
Affordable
Housing
Community.

Columbia

SC

Housing

Columbia
Housing
Authority
‐
Final
Phases
of
Rosewood
Hills
Housing
Development
Infrastructure.

Columbia

SC

Public
Safety

License
Recogni3on
Sobware
Project














200,000


Columbia

SC

Public
Safety
















85,300


Columbia

SC

Public
Safety

Ouzit
command
Star
One
(mobile
unit),
LCD
projec3on
screen/monitor,
outdoor
ligh3ng
equipent,
mobile
800
 MHZ
radios,
digital
recording
equipment,
mobile
dispatching
consoles,
toughbooks,
satelite
telephones,
 portable/mobile
security
cameras Police
AVL
Project

Columbia

SC

Public
Safety

Records
Management
System

Columbia

SC

Public
Safety

Tasers

Columbia

SC

Public
Safety

IT
System
Administrator

Columbia

SC

Public
Safety

CCTV
Surveillance
System
Sec3on
6
and
Surveillance
Officers

Columbia

SC

Public
Safety

Columbia

SC

Public
Safety














604,170


9

Columbia

SC

Public
Safety

Purpose:Afempt
to
combat
the
safety
concerns
created
by
the
increasing
numbers
of
homeless
persons
in
the
 Main
Street,
Vista
and
Five
Points
areas.5
‐
Previously
sworn
law
enforcement
officers
@$47,668
(including
 fringe)Total
cost:
$238,340‐Methodology‐T Warrant/Mental
Health
Transport,
corporal
and
police
officers,
uniforms
&
equipment,
office
furniture,
gas
&
 petroleum
Products,
vehicle
repair/service
&
supply,
warrant
filing
system,
unmarked
police
vehicles SROs
&
Patrol
Vehicles
&
equipment,
SRO
Officers
slary,
uniforms
&
equipment












1,840,834


19

Columbia

SC

Public
Safety

Police
Officers
Salary
&
fringe
benefits,
uniforms
&
equipment,
Patrol
vehicles
&
Equipment












7,266,450


75

Columbia

SC

Schools

Server
Consolida3on.
Purchase
new
servers
and
re3re/consolidate
school
servers.














695,000


5

Columbia

SC

Schools

Wireless
access
for
schools.

Proivde
befer
access
to
students
in
classrooms.














751,000


20

Columbia

SC

Schools

Replace
Mechanical
Units
in
2
schools.












3,000,000


45

Columbia

SC

Schools

Purchase
and
Install
Projectors
&
SmartBoards.
Installs
new
teaching
tool
for
classroom
instruc3on












4,833,000


50
















23,678


5














400,000


10












2,100,000


10














766,006


10














137,877


15












2,140,913


24














531,564


25














624,876


25












1,346,697


25












2,575,866


25














500,000


50














500,000


50












1,000,000


75














230,000
 










1,400,000
 












198,550
 














64,000


1












2,905,610


4














302,562


6

City

State

Program

Columbia

SC

Schools

Columbia

SC

Columbia

Project
Descrip3on

Funding
Required

Jobs












5,000,000


150

Schools

Energy
Efficient
Ligh3ng
and
Controls.
Replaces
old
lights
and
balasts
for
new
energy
efficient
type
with
3me
 controls
fo
energy
savings. Automated
HVAC
Controls
for
Schools.
Provide
energy
controls
for
mechnical
systems
at
schools












7,500,000


200

SC

Streets/Roads

Main
Street
Reconfigura3on
Phase
III










15,000,000


20

Columbia

SC

Streets/Roads

North
Main
Street
Reconfigura3on
Phase
1B










13,000,000


20

Columbia

SC

Streets/Roads

Harden
Street
Reconfigura3on
Phase
II










25,000,000


40

Columbia

SC

Water

Water:Valve
and
Hydrant
Replacement












1,500,000


5

Columbia

SC

Water

Sewer:Broad
River
Pump
Sta3on
Rehabilita3on












2,000,000


10

Columbia

SC

Water

Sewer:North
Columbia
Pump
Sta3on
Rehabilita3on












3,000,000


10

Columbia

SC

Water

Sewer:Saluda
River
Pump
Sta3on
Rehabilita3on












2,000,000


10

Columbia

SC

Water

Sewer:Main
Rehabilita3on












7,000,000


15

Columbia

SC

Water

Sewer:Saluda
River
Force
Main
Replacement












2,000,000


15

Columbia

SC

Water

Water:Rehabilita3on:
Replacement












6,000,000


15

Columbia

SC

Water

Water:Rehabilita3on:Clean
and
Line
Pipe












4,000,000


15

Columbia

SC

Water

Sewer:54”
and
48”
Ouzall
Rehabilita3on










13,000,000


20

Columbia

SC

Water

Sewer:Crane
Creek
Ouzall
Replacement












4,000,000


20

Columbia

SC

Water

Sewer:Main
Replacement












3,000,000


20

Columbia

SC

Water

Sewer:Mill
Creek
Force
Main
Replacement












2,500,000


20

Columbia

SC

Water














278,773


25

Columbia

SC

Water

Domes3c
Water
Conserva3on The
project
proposes
to
reduce
domes3c
water
consump3on
in
all
City
facili3es
by
replacing
or
retrofiqng
all
 standard
water
fixtures
with
High
Efficiency
Systems.
Projected
annual
savings
$15,130 Water:Canal
WTP
HS
Pump
and
RW
Pump
Replacement










25,000,000


25

Columbia

SC

Water










10,248,455


30

Hardeeville

SC

Streets/Roads










93,924,000


1499

Rock
Hill

SC

Streets/Roads












1,750,000


50

Rock
Hill

SC

Streets/Roads












1,474,104


50

Rock
Hill

SC

Streets/Roads












3,900,000


75

Rock
Hill

SC

Water












3,500,000


30

Sumter

SC

CDBG

Name:
Riverview
Road
Improvements Descrip3on:
Through
York
County
Pennies
for
Progress,
funding
is
requested
to
upgrade
the
exis3ng
two
lane
 road
to
include
adding
curb
and
gufer,
sidewalks,
and
drainage
improvements.

In
order
to
support
major
priv Name:
Cel
River
Road
Improvements
 Descrip3on:
Rock
Hill,
South
Carolina
extending
from
the
intersec3on
of
US‐21
and
SR161
east
for
 approximately
6000
feet
to
the
Riverfalls
Business
Park.

Comple3on
of
this
project
will
directly
support
the
 planned Name:
Raw
Water
Intake
48MGD
Upgrade Descrip3on:
This
project
will
upgrade
the
City
of
Rock
Hill’s
raw‐water
intake
facility
on
Lake
Wylie.

The
 capacity
will
increase
from
30
MGD
to
48
MGD.

This
capacity
is
necessary
to
allow
the
full
opera3on
 Codes
Enforcement
Personnel
for
Appearance
Maintenance
Ordinance














350,000


10

Sumter

SC

CDBG

Community
Sidewalk
&
Trails
Project












1,500,000


15

Sumter

SC

CDBG

Removal
of
Slum
and
Blight
Project












1,000,000


15

Sumter

SC

Energy

Energy
Retrofit
of
City
Facili3es
Project












2,000,000


20

Sumter

SC

Housing

Door
replacement
















11,700


1

Sumter

SC

Housing

Dumpster
replacement

















9,000


1

Sumter

SC

Housing

Floor
3le
and
base
board
improvements
















21,238


1

Sumter

SC

Housing

Interior
door
casing
replacement

















7,100


1

Sumter

SC

Housing

Landscaping,
rain
gardens
and
signs
















25,000


1

Sumter

SC

Housing

Raise
clean‐out
caps
















10,000


1

Sumter

SC

Housing

Refrigerator
replacement

















8,000


1

Sumter

SC

Housing

Replacement
of
electrical
panels
















42,000


1

Sumter

SC

Housing

Thermal
blankets
for
water
heaters
















12,500


1

Sumter

SC

Housing

Concrete
and
sidewalk
project
















30,000


2

Sumter

SC

Housing

Powerflush
3olets
















33,725


2

Sumter

SC

Housing

Replacement
of
water
heaters
















56,700


2

Sumter

SC

Housing

Electrical
and
exhaust
fan
replacement
















70,000


3

Sumter

SC

Housing

Lawn
services
















40,500


3

Sumter

SC

Housing

Electric
stove
conversion
with
safety
elements
















99,000


4

Sumter

SC

Housing

Public
Housing
repair
‐
skim
coa3ng/drywall
ceiling
repair
















85,000


4

Sumter

SC

Housing

Bathroom
renova3ons
















88,000


5

Sumter

SC

Housing

Roofing
in
Pinewood
















80,000


5

Sumter

SC

Housing

Pain3ng














105,000


6

Sumter

SC

Housing

Security
















47,000


8

Sumter

SC

Public
Safety

Build
fiber
network
inclusive
of
public
digital
cameras
for
public
safety












2,200,000


10

Sumter

SC

Public
Safety

Security

Equipment
for
City
Parks














500,000


10

Sumter

SC

Public
Safety

Install
mobile
data
terminals
and
digital
dash
video
systems












4,300,000


15

Sumter

SC

Public
Safety

Migrate
all
public
safety
radios
to
P25












4,500,000


15

Sumter

SC

Public
Safety

Public
Safety
Radio
Communica3on
on
I‐95
corridor












5,200,000


15

Sumter

SC

Streets/Roads

Alice
Drive
‐
U.S.
521
to
Wesmark
Blvd.












8,350,000


Sumter

SC

Streets/Roads

Improvements
to
City
Roads












2,500,000


25

Sumter

SC

Transit

Five
public
transporta3on
buses












1,214,000


12

Metro
Wastewater
Treatment
Plant
Digester
Gas
U3liza3on The
project
proposes
to
make
repairs
to
the
anaerobic
digesters,
digester
gas
system
and
mul3ple
hearth
 incinerators
in
order
to
maximize
the
beneficial
use
of
digester
gas
and
minimize
the
use
o Construc3on
of
new
Interstate
95
Exit
3
in
South
Carolina,
new
Purrysburg
Road
4‐Lane
Road
and
 complimentary
intersec3on
improvements. Name:
Galleria
Blvd.
Extension Descrip3on:
This
is
a
road
construc3on
project
to
link
Galleria
Blvd.
from
the
future
Mee3ng
Street
intersec3on
 to
Red
River
Road.

Both
Galleria
Blvd.
and
Red
River
Road
are
the
major
roads
serving
and
linking
two
co

City

State

Program

Sumter

SC

Water

Nazerene
Church
Road
U3lity
Improvements

Project
Descrip3on

Funding
Required 












750,000


Jobs 10

Sumter

SC

Water

Sumter

SC

Water

Nefles
Road
U3lity
Improvements














150,000


10

15
South
Industrial
Park
Welland
U3lity
Improvements














650,000


Sumter

SC

15

Water

Boulevard
Road
to
U.S.
521
‐
20,735
feet
at
$30
a
foot














622,050


Sumter

15

SC

Water

Clipper
Road
well














650,000


15

Sumter

SC

Water

Old
Manning
Road/Beulah
Cuqno
‐
29,000'
at
$30
a
foot














870,000


15

Sumter

SC

Water

Tindal
Road
‐
11,500'
at
$30
a
foot














345,000


15

Sumter

SC

Water

Water
Plant
Improvements














960,000


15

Sumter

SC

Water

Willis/Community/Shot
Pouch
Drainage
Improvements














275,000


15

Sumter

SC

Water

Wilson
Hall
Bridge
Waterline














100,000


15

Sumter

SC

Water

521
Industrial
Park
U3lity
Improvements












1,500,000


20

Rapid
City

SD

Energy

Rapid
City
Energy
Plant
Improvements












9,000,000


60

Rapid
City

SD

Streets/Roads

Rapid
City
Eglin
Street
Construc3on












1,300,000


10

Rapid
City

SD

Streets/Roads

Rapid
City
East
Anamosa
Reconstruc3on












3,000,000


20

Rapid
City

SD

Streets/Roads

Rapid
City
Public
Parkign
Garage












7,000,000


46

Rapid
City

SD

Water

Rapid
City
Knollwood
Drainage
Improvements












2,000,000


14

Rapid
City

SD

Water

Rapid
City
Elk
Vale
Sewer
Construc3on












2,500,000


16

Rapid
City

SD

Water

Rapid
City
Canyon
Lake
Dam
Reconstruc3on












6,000,000


30

Rapid
City

SD

Water

Rapid
City
Water
Treatment
Plants








140,000,000


466

Sioux
Falls

SD

CDBG

City
Hall
Annex
HVAC
controls:
This
project
updates
the
HVAC
controls
in
the
Annex.














200,000


6

Sioux
Falls

SD

CDBG

City
Hall
Elevator:
The
project
will
replace
the
present
an3quated
elevator
in
City
Hall.














600,000


6

Sioux
Falls

SD

CDBG














900,000


10

Sioux
Falls

SD

CDBG














200,000


30

Sioux
Falls

SD

CDBG










18,000,000


360

Sioux
Falls

SD

Energy












2,000,000


40

Sioux
Falls

SD

Public
Safety












1,250,000


30

Sioux
Falls

SD

Public
Safety

Sioux
Falls

SD

Public
Safety

City
Hall
HVAC
System:
This
project
will
replace
the
obsolete
HVAC
system
at
City
Hall,
which
includes
replacing
 the
original
boilers,
installing
digital
controls,
and
associated
equipment
that
will
bring
the
air
quality
in
the
 building
up
to
current
ASHR Caille
Branch
Library
and
Ronning
Branch
Library
Improvements
including
a
new
roof,
ice
and
water
shields,
 security
systems
and
carpet Public
Parking
ramp:
This
project
includes
the
construc3on
of
a
new
public
parking
ramp
providing
 approximately
1,000
parking
stalls
in
the
downtown
area.
This
new
ramp
would
act
as
a
catalyst
to
support
 addi3onal
redevelopment
opportuni3es
downtown
wh Energy
Efficient
Traffic
and
Street
Ligh3ng
Systems:
These
projects
will
replace
older,
inefficient
incandescent
 traffic
signals
and
streetlights
with
high‐efficiency
LED
lamps. Fire
Rescue
Training
Center
Academic
Building:
This
project
will
provide
for
an
addi3on
and
major
renova3ons
 to
the
current
30‐year‐old
training
center
academic
building.
This
will
allow
us
to
incorporate
modern
 technologies
into
the
curriculum
and
host Fire
Rescue
Training
Center
Tower:This
project
will
replace
the
30‐year‐old
training
fire
building
that
is
u3lized
 by
fire
departments
and
law
enforcement
agencies
across
the
region.
Interagency
training
has
been
scaled
 back
un3l
the
current
tower
can
b Construc3on
of
an
ins33tu3onal
fiber
network

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Streets/Roads

Sioux
Falls

SD

Water

Sioux
Falls

SD

Water

Sioux
Falls

SD

Water

Cleveland

TN

Airport

Cleveland

TN

CDBG

Cleveland

TN

Housing

Benson
Road
Expansion:
The
project
will
improve
access
to
a
growing
retail
and
office
development
in
western
 Sioux
Falls. Maple
Street
Expansion
West:
The
project
will
improve
safety
and
access
to
a
major
university
campus
and
 residen3al
neighborhood
in
northwest
Sioux
Falls. Southeastern
Avenue
Extension:
The
project
will
improve
access
to
a
residen3al
growth
area
in
southern
Sioux
 Falls. Maple
Street
Expansion
East:
This
project
will
expand
the
City’s
transporta3on
system
and
connect
two
heavily
 used
regional
recrea3on
facili3es. 69th
Street
Railroad
Overpass:
The
project
will
improve
safety
for
a
nearby
residen3al
area
that
includes
a
K‐12
 educa3onal
campus
and
a
college
athle3c
complex.
 Rail
Reloca3on
Project:
The
project
includes
construc3on
of
a
new
rail
yard,
trestle,
and
accompanying
 connec3ons
in
Sioux
Falls.
The
exis3ng
tracks
would
be
removed
to
allow
for
redevelopment
of
land
in
 downtown
Sioux
Falls.
When
fully
built
out,
the 85th
Street
and
Interstate
29
Interchange:
The
project
will
provide
access
to
over
200
acres
of
land
planned
for
 a
new
medical/office/retail
center
that
will
include
the
crea3on
of
over
8,000
new
jobs
for
the
region. 69th
Street
Extension/Interstate
29/Interstate
229
Reconstruc3on:
The
project
will
provide
a
cri3cal
east‐west
 link
for
the
region’s
transporta3on
system
and
will
alleviate
traffic
conges3on
on
local
roads
and
the
interstate
 highway
system. Sioux
Falls
Flood
Control
Project:
This
project
includes
raising
the
current
levees,
reconstruc3on
of
the
41st
 Street
bridge
over
the
Big
Sioux
River,
and
construc3on
of
a
dam
to
protect
property
totaling
$750
million
in
 value
from
flooding. South
Dakota
Highway
100:
Construc3on
of
a
new
four‐lane
divided
highway
to
alleviate
conges3on
on
exis3ng
 state
highways
and
local
roads.
Approximately
one
mile
of
the
en3re
18
miles
has
been
completed.
 Covell
Lake
Bank
Stabiliza3on:
This
project
will
stabilize
the
banks
of
Covell
Lake
to
prevent
erosion
of
the
 shoreline
and
improve
the
water
quality.

The
bank
stabiliza3on
will
protect
Madison
Street
on
both
sides,
 protect
improvements
made
near
the
l Water
Supply,
Storage,
and
Distribu3on
Enhancements:
The
project
will
include
expansion
of
the
City’s
above
 and
below
ground
storage
capabili3es,
new
well
construc3on,
and
replacement
of
aging
distribu3on
lines. Central
Main
Sanitary
Sewer:
This
project
includes
the
reconstruc3on
and
expansion
of
a
cri3cal
segment
of
 the
sanitary
sewer
system
located
along
the
Big
Sioux
River. Construc3on
of
Airport
$5,060,000.
 Sewer
for
Airport
$5,000,000 CDBG
Projects:
public
facili3es,
pedestrian
access
to
high
density
housing,
improvement
to
curb,
gufer
and

 sidewalks. Veterans
Nursing
Home
Construc3on

Cleveland

TN

Public
Safety

Cleveland

TN

Public
Safety

Cleveland

TN

Schools












2,750,000


50












3,000,000


144












2,800,000


56












3,400,000


68












3,500,000


70












7,000,000


140












7,500,000


150












8,000,000


160










20,000,000


400










25,000,000


500










35,000,000


700








100,000,000


2000












1,000,000


20










28,000,000


560










31,000,000


620










10,060,000


100












2,000,000


30












4,300,000


310

800
mhz
Radio
System
and
Tower
for
all
county‐wide
public
safety
communica3on.
















500,000


15

Fire
Training
Tower















400,000


55

Parker
Street
Extension
for
Mayfield
Elementary
School
















950,000


40

City

State

Program

Cleveland

TN

Schools

New
Construc3on
of
Cleveland
High
School
Science
Wing


Project
Descrip3on

Funding
Required 










8,000,000


Jobs 200

Cleveland

TN

Streets/Roads

Cleveland

TN

Streets/Roads

APD
40
Interchange
&
Exit
20
Improvements










20,000,000


100

Cleveland
By‐Pass
to
State
Route
40(Waterlevel)
to
Paul
Huff
Pkwy.











12,000,000


Cleveland

TN

100

Streets/Roads

Paul
Huff
Pkwy
extension
to
Freewill
Road.














4,500,000


Germantown

100

TN

Public
Safety












2,100,000


36

Germantown

TN

Streets/Roads














200,000


3.5

Germantown

TN

Streets/Roads














350,000


6

Germantown

TN

Streets/Roads

Fire
Sta3on
Number
4
located
at
3031
Forest
Hill‐Irene
Road,
was
originally
constructed
in
the
late
1960’s.

The
 facility
is
in
a
state
of
disrepair
including
numerous
water
leaks,
termite
damage
and
mold
throughout
the
 building.
The
new
sta3on
will
be
 Moore
Road
Improvements
‐
Improvements
to
the
unimproved
sec3on
of
Moore
Road
that
is
adjacent
to
 Germantown
High
School. Forest
Hill
‐
Irene
Road
Improvements
‐
Comple3on
of
the
improvements
to
Forest
Hill‐
Irene
Road
between
 Poplar
Avenue
and
Poplar
Pike
and
the
Intersec3on
of
Forest
Hill‐
Irene
and
Forest
Hill
way
to
correct
a
sight
 distance
problem. McVay
Road
‐
Improvements
to
Mcvay
Road
that
will
eliminate
a
hazardous
90
degree
curve
and
an
old
bridge.












1,750,000


31

Germantown

TN

Streets/Roads












2,538,000


44

Germantown

TN

Streets/Roads












5,200,000


100

Germantown

TN

Streets/Roads












8,000,000


138

Germantown

TN

Water
















70,000


1.5

Germantown

TN

Water

Farmington
Boulevard
Rehab
‐
Complete
rehab
of
Farmington
Boulevard,
a
primary
east‐west
artery
that
has
 seen
a
ten
fold
increase
in
traffic
resul3ng
in
damage
to
the
roadway
and
sub
grade. Germantown
Realignment
‐
Improved
alignment
to
Germantown
Road
that
will
eliminate
traffic
through
the
 Business
District. Poplar
Avenue

Culvert
Replacement
‐
Replacement
of
26
corrugated

metal
culverts
that
are
failing
and
 crea3ng
a
safety
problem. Moore
Road
Water
Main
‐
Installa3on
of
700
linear
feet
of
8"
water
main
in
Moore
Road
replacing
an
old
 transite
water
line Arthur
Road
Water
Main
‐
Installa3on
of
1,500
linear
feet
of
8














200,000


3.5

Germantown

TN

Water

Arthur
Road
Drainage
‐
Improvement
to
an
old
WPA
drainage
way
from
Aruthr
Road
west
to
Germantown
Road

Germantown

TN

Water

Forest
Hill‐Irene
Water
Main
Extension
‐
Installa3on
of
7,500
linear
feet
of
16

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Germantown

TN

Water

Johnson
Road
Sewer
Lib
Sta3on
‐
Replacement
of
a
22‐year‐old
sanitary
sewer
lib
sta3on
that
is
 malfunc3oning
and
beyond
repair Shady
Creek
Weir
‐
Replacement
of
a
weir
in
Shady
Creek
that
is
in
danger
of
failing
due
to
damage
from
flood
 waters Lateral
E
Weir
‐
Repair
of
a
weir
that
is
failing
in
Lateral
E
at
the
confluence
of
the

Wolf
River
that
is
causing
a
 severe
bank
erosion
problem
and
threatening
a
walking
trail
and
lake Miller
Farms
Sewer
Improvements
‐
Improvements
to
the
Miller
Farms
Sewer
Ouzall
to
add
addi3onal
capacity
 to
handle
addi3onal
flows
generaged
by
new
commercial
development Miller
Farms
Drainage
‐
Improvements
to
a
deteriorated
open
channel
drainage
way
from
Pyron
Oaks
Cove
 north
to
Weeping
Willow
Road Lateral
F
‐
Repair
of
1,000
linear
feet
of
concrete
channel
lining
that
is
failing
and
threatening
to
block
flow
in
 the
drainageway. Mimosa
Gardens
Drainage
‐
Improvements
to
a
50‐year‐old
storm
water
drainage
system
to
reduce
the
treat
of
 flood
within
the
Mimosa
Gardens
neighborhood Wolf
River
Boulevard
Water
Main
Extension
‐
Installa3on
of
1,200
linear
feet
of
12

Jackson

TN

CDBG

Comple3on
of
Anderson
Creek
Park
4
















75,000


5

Jackson

TN

CDBG

Day
Shelter
for
Homeless
Renova3on
















30,000


5

Jackson

TN

CDBG

Turning
Point
Safehaven
Comple3on
















50,000


5

Jackson

TN

CDBG














500,000


10

Jackson

TN

CDBG

Community
Services.
Build
a
transi3onal
living
facility
for
women
and
children
that
have
been
adversely
 affected
by
alcohol
and
drug
abuse. Downtown/East
Jackson
Street
Ligh3ng
Project
Expansion














120,000


10

Jackson

TN

CDBG

Minor/Emergency
Repair
Program
3














150,000


10

Jackson

TN

CDBG

Single
Family
Rental
Infill
Development














200,000


10

Jackson

TN

CDBG

Infill
property
development
North
Royal
Street














300,000


20

Jackson

TN

CDBG

Target
Rehab/Replacement
Housing
Geographic
Expansion














750,000


25

Jackson

TN

CDBG

Phillips
St.
Reconstruc3on
Project














325,000


30

Jackson

TN

CDBG

Small
Business
Incubator
Development‐Chester
Street














300,000


30

Jackson

TN

Housing

Redevelopment
and
stabaliza3on
of
blighted
downtown
areas
by
construc3ng
office
and
retail
space.











30,000,000


100

Jackson

TN

Public
Safety

Visonair
Web
Based
computer
system;
replace
an3quated
AS
400;












2,500,000


5

Jackson

TN

Public
Safety

Intraoperable
communica3ons
system
for
disasters
and
public
safety
incidents.













8,000,000


10

Jackson

TN

Public
Safety












7,000,000


50

Jackson

TN

Schools

Construc3on
of
a
consolidated
EMS
Center
that
would
facilitate
communica3ons
between
emergency
 management,
city
and
county
pubic
safety
en33es
during
cri3cal
situa3ons.
 New
high
school
to
replace
a
50
plus
year
old
school
in
a
very
congested
area










27,000,000


300

Jackson

TN

Streets/Roads

Intelligent
Transporta3on
System
which
will
enhanse
the
signaliza3on
and
3ming
of
congested
traffic
paferns.













2,700,000


10

Jackson

TN

Streets/Roads

Widen
the
highly
congested
Hollywood
Drive
from
Interstate
40
to
70
By‐Pass












4,000,000


50

Jackson

TN

Transit

Construc3on
of
an
alterna3ve
fuel
conversion
sta3on


Jackson

TN

Transit

Central
office
for
municipal
transit
system
to
supliment
new
opera3ons
center














300,000


20

Jackson

TN

Transit

Construc3on
of
airport
hangers












1,400,000


20

Jackson

TN

Water

Stormwater,
Resovoir,
upgrades














500,000


10

Johnson
City

TN

CDBG

Bristol
Highway
Bicycle/Pedestrian
Trail










10,000,000


Johnson
City

TN

CDBG

Construc3on
of
new
fire
sta3on












2,000,000


Johnson
City

TN

CDBG

Keystone
Neighborhood
Revitaliza3on/Community
Center










15,000,000


Johnson
City

TN

CDBG

King
Creek
Flooding
Mi3ga3on










15,000,000


Johnson
City

TN

CDBG

Winged
Deer
Bicycle/Pedestrian
Trail

Johnson
City

TN

Schools

Construc3on
of
new
Fairmont
Elementary
School
to
replace
exis3ng
school










16,000,000


Johnson
City

TN

Streets/Roads

‐street
milling
and
resurfacing










10,000,000


Johnson
City

TN

Water

‐sewer
interceptor
line
replacement
and
upgrade












7,000,000


Johnson
City

TN

Water

‐sewer
lib
sta3on
upgrades
to
increse
capacity
and
structural
integrity












7,000,000















300,000


6














550,000


9.5














600,000


11














700,000


12














800,000


14














962,000


17












1,100,000


19












2,000,000


35












2,000,000


35 100














530,000


City

State

Program

Johnson
City

TN

Water

‐water
transmission
line
replacement
and
upgrades

Project
Descrip3on

Johnson
City

TN

Water

‐water
treatment
plant
improvements

Knoxville

TN

Streets/Roads

BETHEL
AVE:

KUB
Water
Project
‐
Cast
Iron
(7,500
lf).












2,200,000


6

Knoxville

TN

Streets/Roads

BRUHIN
ROAD:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(8,300
lf).












1,500,000


6

Knoxville

TN

Streets/Roads

CHESTERFIELD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(8,800
lf).














490,000


6

Knoxville

TN

Streets/Roads

COESTA
CIRCLE:

KUB
Water
Project
‐
Galvanized
Main
(3,700
lf).














252,000


6

Knoxville

TN

Streets/Roads

COLONIAL
VILLAGE
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(13,000
lf).












1,500,000


6

Knoxville

TN

Streets/Roads

CONCORD
STREET:

KUB
Water
Project
‐
Cast
Iron
(2,600
lf).














575,000


6

Knoxville

TN

Streets/Roads

CURTIS
ROAD:

KUB
Water
Project
‐
Galvanized
Main
(2,700
lf).














150,000


6

Knoxville

TN

Streets/Roads

DEERFIELD
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(12,000
lf).












1,300,000


6

Knoxville

TN

Streets/Roads

DUNCAN
ROAD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(5,945
lf).














900,000


6

Knoxville

TN

Streets/Roads

HOLSTON
DRIVE:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(19,000
lf).












1,700,000


6

Knoxville

TN

Streets/Roads

LONSDALE
AREA:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(18,000
lf).












1,650,000


6

Knoxville

TN

Streets/Roads

NORTHSHORE
‐
PHASE
I:

KUB
Water
Project
‐
Increase
Capacity
(6,500
lf).












1,000,000


6

Knoxville

TN

Streets/Roads

OLD
DANDRIDGE
PIKE:

KUB
Water
Project
‐
Increase
Capacity
(5,200
lf).














468,000


6

Knoxville

TN

Streets/Roads

RAMBLING
ACRES:

KUB
Water
Project
‐
Galvanized
Main
(8,500
lf).














550,000


6

Knoxville

TN

Streets/Roads

RIFLE
RANGE
ROAD:

KUB
Water
Project
‐
Galvanized
Main
(5,200
lf).














520,000


6

Knoxville

TN

Streets/Roads

RIVERSIDE
DRIVE:

KUB
Water
Project
‐
Cast
Iron
(2,200
lf).














800,000


6

Knoxville

TN

Streets/Roads

SCHUBERT
ROAD
AREA:

KUB
Water
Project
‐
Galvanized
Main
(6,000
lf).














350,000


6

Knoxville

TN

Streets/Roads

SOUTH
HILLS
DRIVE
AREA:

KUB
Water
Project
‐
Galvanized
Main
(14,000
lf).












1,400,000


6

Knoxville

TN

Streets/Roads

SUTHERLAND
AVE:

KUB
Water
Project
‐
Cast
Iron/Galvanized
Main
(12,000
lf).












1,250,000


6

Knoxville

TN

Streets/Roads

PAVEMENT
MARKING
MAINTENANCE
CITYWIDE:

Restripe
all
currently
striped
roadways
throughout
the
City.














500,000


9

Knoxville

TN

Streets/Roads

GUARDRAIL
IMPROVEMENT
CITYWIDE:

Replace
outdated
lengths
of
guardrail
throughout
the
City.














350,000


14

Knoxville

TN

Streets/Roads
















50,000


14

Knoxville

TN

Streets/Roads
















25,000


14

Knoxville

TN

Streets/Roads

MARY
JAMES
PARK
RESTORATION:

Reshape
exis3ng
alignment
of
Baker
Creek
to
a
more
natural
state
thus
 improving
water
quality
by
decreasing
erosion
and
introducing
vegeta3on. TRANSFER
STATION
WATER
QUALITY
UNIT:

Install
drainage
devices
at
solid
waste
transfer
sta3on
to
address
 illicit
discharge
into
storm
drainage
system. ALLEY
PAVING
CITYWIDE:

Regrade
and
pave
100
alleys
throughout
the
City.












1,500,000


19

Knoxville

TN

Streets/Roads

CITYWIDE
STREET
LIGHT
INSTALLATION:

Installa3on
and
replacement
of
street
lights
along
City
streets.












1,500,000


20

Knoxville

TN

Streets/Roads














250,000


20

Knoxville

TN

Streets/Roads












1,600,000


21

Knoxville

TN

Streets/Roads

DOWNTOWN
SIDEWALK
REPLACEMENT:

Replace
sidewalk
along
Market
Street
from
Cumberland
Avenue
to
 Church
Avenue. TRAFFIC
SIGNAL
UPGRADES
CITYWIDE:

Upgrade
exis3ng
traffic
signals,
school
flashers,
and
pedestrian
signals
 throughout
the
City. SIGNAL
RETIMING/RENOVATION
CITYWIDE:

Re3me
and
rephase
signals
along
arterials
throughout
the
City.














500,000


24

Knoxville

TN

Streets/Roads












1,000,000


25

Knoxville

TN

Streets/Roads














400,000


25

Knoxville

TN

Streets/Roads












3,500,000


25

Knoxville

TN

Streets/Roads

Knoxville

TN

Streets/Roads

Knoxville

TN

Streets/Roads

Knoxville

TN

Knoxville

ADA
IMPROVEMENTS
TO
COLISEUM:

Install
elevator
in
coliseum
parking
garage
and
restripe
parking
spaces.

 Increase
accessible
sea3ng
in
Coliseum. CHESTNUT
STREET
REALIGNMENT:

Reconstruc3on
of
intersec3on
including
property
acquisi3on,
u3li3es
 reloca3on,
and
road
construc3on. FIRST
CREEK
DRAINAGE
IMPROVEMENTS:

Construc3on
of
an
overflow
channel
along
First
Creek
and
two
new
 bridges
at
Emorland
and
Fairmont
Blvd. WESTLAND
DRIVE
BRIDGE
REPLACEMENT:

Replace
narrow
bridge
under
Westland
Drive
and
channel
 improvements
upstream
to
alleviate
roadway
flooding. RESURFACING
CITYWIDE:

Resurface
100
miles
of
asphalt
roadway
throughout
the
City.

Funding
Required 










1,500,000


Jobs












1,500,000















880,000


25










12,000,000


29












2,200,000


35

Streets/Roads

CROSS
PARK
DRIVE
DRAINAGE
IMPROVEMENTS:

Drainage
improvements
along
Cross
Park
Drive
from
Park
 Village
Road
to
Cross
Creek
Road. VALLEY
VIEW
REALIGNMENT
PROJECT:

Relocate
roadway
to
intersect
Washington
Pike
at
Centerline
Drive.












1,600,000


35

TN

Streets/Roads

CURB
CUTS
CITYWIDE:

Install
1000
curb
cuts
at
intersec3ons
with
exis3ng
sidewalks
throughout
the
City.












1,400,000


38

Knoxville

TN

Streets/Roads












1,100,000


38

Knoxville

TN

Streets/Roads

SIDEWALK
REPLACEMENT
CITYWIDE:

Replace
260,000
square
feet
of
deteriorated
sidewalks
throughout
the
 City. GAY
STREET
STREETSCAPES:

Reconstruc3on
of
the
100
and
200
blocks
of
Gay
Street.













3,500,000


55

Knoxville

TN

Streets/Roads












1,600,000


55

Knoxville

TN

Streets/Roads












2,500,000


75

Knoxville

TN

Streets/Roads










18,000,000


85

Allen

TX

CDBG










20,000,000


400

Allen

TX

CDBG










20,000,000


400

Allen

TX

Public
Safety














750,000


7

Allen

TX

Public
Safety












3,500,000


20

Allen

TX

Public
Safety










14,500,000


75

Allen

TX

Streets/Roads












2,250,000


11

Allen

TX

Streets/Roads












3,300,000


16

Allen

TX

Streets/Roads












7,300,000


36

VESTAL
BUSINESS
DISTRICT
INFRASTRUCTURE:

Construc3on
of
public
plaza,
greenway,
sidewalks,
and
curbs;
 creek
and
stormwater
improvements;
reloca3on
of
Chappell
Road. ADA
IMPROVEMENTS
TO
CITY
FACILITIES:

Renova3on
of
20
city
facili3es
to
improve
accessibility
to
people
 with
disabili3es. SOUTH
WATERFRONT
PUBLIC
IMPROVEMENTS:


Land
purchases
and
construc3on
of
a
new
park,
streets,
and
 u3li3es
to
revitalize
former
industrial
waterfront
area. Arts
of
Collin
County
Performing
Arts
Hall.

$80,000,000
joint
project
with
Ci3es
Allen,
Frisco
and
Plano.

Need
 funds
to
cover
infla3on
generated
gap. Arts
of
Collin
County
Performing
Arts
Hall.
$80,000,000
joint
project
with
Ci3es
Allen,
Frisco
and
Plano.
Need
 funds
to
cover
infla3on
generated
gap. Animal
Shelter
Expansion
to
meet
the
service
needs
of
this
rapidly
growing
area.
 Fire
Sta3on
Number
5‐This
is
a
new
fire
sta3on
for
this
rapidly
growing
City.

This
sta3on
will
have
have
1
 ambulance
and
engine
company
crea3ng
18
new
firefighter/paramedic
jobs
upon
comple3on.
This
facilty
is
 planned
as
a
LEED
pla3num
facility.

 City
of
Allen
Service
Center/Public
Safety
Training
Facility‐This
new
facility
will
have
over
60,000
sf
of
office
 space,
shop
space,
and
classroom
space
with
a
240,000
sf
public
safety
driving
track. Wafers
Road‐This
project
includes
the
construc3on
of
5,500
feet
of
2
addi3onal
lanes
on
this
regional
arterial.
 This
will
bring
the
total

number
of
lanes
from
2
to
4. Bethany
Drive
Widening‐This
project
includes
8,000
feet
of
roadway
widening
where
2
addi3onal
lanes
will
be
 added
to
this
exis3ng
4‐lane
divided
regional
arterial
from
Allen
Heights
to
Angel
Parkway.

 Ridgeview
Drive
Custer
Road
to
ALma
Drive‐This
project
includes
the
construcion
of
8,800
feet
of
this
regional
 arterial
as
a
4‐lane
divided
roadway
to
meet
the
con3nuing
traffic
demands
in
this
rapidly
growing
urban
area.


City

State

Program

Allen

TX

Streets/Roads

Allen

TX

Water

Allen

TX

Water

Arlington

TX

Airport

Ridgeview
Drive
from
Stacy
Road
to
US
75‐This
7000
foot
project
includes
4
new
lanes
of
regional
divided
 arterial. Highmeadow
Sewer
Replacement‐This
project
replaces
9200
feet
of
exis3ng
8"and
4"
clay
sewer/service
lines

 with
PVC
lines
in
this
1960's
residen3al
neighborhood

This
project
will
benefit
107
residen3al
homes. Hillside
Water
Tower
Replacement‐This
project
includes
a
2
million
gallon
elevated
water
tower
that
replaces
a
 func3onally
obsolete
500,000
gallon
water
tank
ocnstructed
in
the
early
1970's
and
replaces
2500
feet
of
 asbestos
cement
water
line
with
pvc. Installa3on
of
Medium‐Intensity
Approach
Ligh3ng
System
with
Runway
Alignment
Indicator
(MALSR)

Project
Descrip3on

Arlington

TX

Airport

Arlington

TX

Airport

Arlington

TX

Arlington

Funding
Required

Jobs












8,700,000


44












1,000,000


5












5,000,000


25












1,600,000


12

Taxiway
ligh3ng
system












1,000,000


12












1,000,000


17

Airport

Airport
security
enhancements
‐
new
fencing,
integrated
security
systems,
electronic
gates,
and
other
 improvements
designed
to
meet
new
regula3ons
under
discussion
at
TSA Installa3on
of
airport
security












1,000,000


17

TX

Airport

Northeast
airport
development
area
internal
access
road
and
access
taxiway












2,000,000


20

Arlington

TX

Airport

Aircrab
parking
apron
construc3on












2,850,000


24

Arlington

TX

Airport

Construc3on
of
new
airport
hangars












2,200,000


34

Arlington

TX

Airport

Construc3on
of
new
terminal
building












5,100,000


73

Arlington

TX

Airport

5000'
west
parallel
taxiway










11,000,000


98

Arlington

TX

CDBG

Weatheriza3on
program
in
NRSA














500,000


2

Arlington

TX

CDBG

Hugh
Smith
Recrea3on
Center
Replacement

Arlington

TX

CDBG

Arlington

TX

Arlington

TX

Arlington












2,100,000


4

Bridge
repain3ng
(Randol
Mill,
Nolan
Ryan
&
Center/Mesquite)














450,000


10

CDBG

Crystal
Canyon
Nature
Preserve
Development














600,000


10

CDBG

Move
u3li3es
underground
in
Founders
Plaza














300,000


10

TX

CDBG

Skate
Park
Development












1,000,000


10

Arlington

TX

CDBG

Vandergriff
Park
Trail
System












1,000,000


10

Arlington

TX

CDBG

Wimbledon
Park
Renova3ons














300,000


10

Arlington

TX

CDBG

BC
Barnes
Park
Renova3ons














600,000


15

Arlington

TX

CDBG

City
Hall
First
Floor
Remodel












2,000,000


15

Arlington

TX

CDBG

OS
Gray
Nature
Preserve
Development














100,000


15

Arlington

TX

CDBG

Vandergriff
Park
Roadways/Parking
Lots












1,500,000


15

Arlington

TX

CDBG

Veterans
Park
Renova3ons












1,000,000


15

Arlington

TX

CDBG

Accessibility
improvements
throughout
NRSA
(eg.
ADA
ramps)












1,000,000


20

Arlington

TX

CDBG

East
Branch
Library
expansion












1,000,000


20

Arlington

TX

CDBG

New
Data
Center












1,000,000


20

Arlington

TX

CDBG

Purvis
House
Historic
Preserva3on












1,000,000


20

Arlington

TX

CDBG

Sewer
Service
lines
for
low
income
households
in
NRSA












1,000,000


20

Arlington

TX

CDBG

Southwest
Nature
Preserve
Development












2,000,000


20

Arlington

TX

CDBG

Treepoint
Park
Development












1,500,000


20

Arlington

TX

CDBG

Webb
Community
Park
Roadway/Parking/Trails












3,500,000


20

Arlington

TX

CDBG

Catholic
Chari3es'
Foster
Youth
Facility














250,000


24

Arlington

TX

CDBG

Construct
one
downtown
parking
garage










15,000,000


25

Arlington

TX

CDBG

Lake
Arlington
Community
Room












2,500,000


25

Arlington

TX

CDBG

Arlington
Tennis
Center
Expansion












4,000,000


30

Arlington

TX

CDBG

CW
Difo
Golf
Course
Renova3ons












6,000,000


30

Arlington

TX

CDBG

Linear
Park
Trail
Development
(Bowman
Branch,
Rush
Creek,
Sublef
Creek)












6,000,000


30

Arlington

TX

CDBG

Mixed‐Use
Development
with
CDBG
used
for
new
office,
retail,
infrastructure














500,000


30

Arlington

TX

CDBG

River
Legacy
Parks
Roadways/Parking
Lots












4,000,000


30

Arlington

TX

CDBG

Aqua3c
facility
renova3ons












5,000,000


35

Arlington

TX

CDBG

Harold
Paferson
Sports
Center
Renova3ons










10,000,000


35

Arlington

TX

CDBG

Recrea3on
Center
renova3ons












5,000,000


35

Arlington

TX

CDBG

Mar3n
Luther
King
Jr.
Sports
Development
Center












6,000,000


40

Arlington

TX

CDBG

Tierra
Verde
Banquet
Center












8,000,000


40

Arlington

TX

CDBG

Webb
Community
Park
Development












6,000,000


40

Arlington

TX

CDBG

Playground
renova3ons
at
15
neighborhood
and
community
parks












3,000,000


45

Arlington

TX

CDBG

Downtown
parking
garage
for
joint
use
by
public
and
UTA
students










30,000,000


50

Arlington

TX

CDBG

NRSA
Streets,
Sidewalk,
Sewer,
Street
Lights
(Town
North
and
East
Arlington
Police
Repor3ng
Areas)












3,500,000


50

Arlington

TX

CDBG

Bicycle,
shared‐path,
connected
trails
and
sidewalk
projects












2,500,000


90

Arlington

TX

CDBG

Conven3on
Center
Parking
Garage










23,000,000


140

Arlington

TX

CDBG

Conven3on
Center
Expansion










39,000,000


212

Arlington

TX

Energy

Conven3on
Center
Roof
Top
Voltaic
Solar
Array
35KW
to
Power
Emergency
Ligh3nig














500,000


5

Arlington

TX

Energy

City
Renewable
Energy
Genera3on
Project
‐Solar
and
wind‐power
installa3ons
on
municipal
buildings














782,500


28

Arlington

TX

Energy

Residen3al
Energy
Efficiency
Project
‐Energy
audits
for
single
family
residen3al
homes










16,057,500


57

Arlington

TX

Public
Safety

Commercial
Motor
Vehicle
Unit
expansion
(2
vehicles
fully
equiped
for
detail)














136,454


Arlington

TX

Public
Safety

Computer
forensic
equipment
















57,000


Arlington

TX

Public
Safety

Covert
Ops/Narco3cs
surveillance
vehicle














130,000


Arlington

TX

Public
Safety

Drug
interdic3on/human
trafficking
unit
(vehicles
and
equipment)














258,218


Arlington

TX

Public
Safety

DWI
vehicles
to
increase
interdic3on














212,666


Arlington

TX

Public
Safety

Homeland
Security
Unit
(4
all
terrain
vehicles,
10
human
transport
vehicles)














134,000


Arlington

TX

Public
Safety

Jail
maintenance
&
improvements
(transfer
vehicle,
intoxilizer
machine,
fingerprint
machine)














620,500


Arlington

TX

Public
Safety

Laser
equipment
for
Patrol
&
Traffic
(phased
replacement/addi3on
of
200
units)














400,000


Arlington

TX

Public
Safety

Patrol
carbine
rifles
(47)

Arlington

TX

Public
Safety

SWAT
equipment
(support
vehicle,
mobile
command
unit,
explosive
entry
program,
armored
vehicle)
















56,815
 










1,600,000


City

State

Program

Arlington

TX

Public
Safety

Taser
deployment
(600
units)

Project
Descrip3on

Funding
Required 












729,000


Jobs

Arlington

TX

Public
Safety

Traffic
and
DWI
Unit
equipment
(cameras,
motor
tour
pack)
















78,766


Arlington

TX

Public
Safety

Unmanned
aircrab
program
to
increase
surveillance
and
security














625,000


Arlington

TX

Public
Safety

Wireless
broadband
to
improve
vehicle
communica3on

Arlington

TX

Public
Safety

Addi3onal
police
officer
staffing












1,005,000


Arlington

TX

Schools

Provide
addi3onal
classroom
technology
(scanners,
cameras,
document
cameras)












2,000,000


Arlington

TX

Schools

Provide
graphing
calculators
for
math
classrooms














690,000


Arlington

TX

Schools

Provide
science
probeware
equipment
for
science
classrooms














425,000


Arlington

TX

Schools

Replacement
of
old
printers
with
new
equipment














500,000


0.5

Arlington

TX

Schools

Upgrade/repair
auditorium
at
Hutcheson
JH
















75,000


0.8

Arlington

TX

Schools

Provide
a
new
student
management
system
to
provide
befer
access
to
data
for
district
decision
making












1,600,000


1

Arlington

TX

Schools

Provide
updated
technology
to
Career
and
Technology
classrooms












1,000,000


1

Arlington

TX

Schools

Replacement

of
older
network
equipment
and
file
servers
with
new
equipment












1,800,000


1

Arlington

TX

Schools

Provide
addi3onal
computer
lab
access
via
laptop
computers
to
each
campus












2,450,000


2

Arlington

TX

Schools

Replacement
of
7,8
and
9
year
old
computers
with
new
equipment










14,000,000


4

Arlington

TX

Schools

Upgrade
and
modernize
electrical
systems
at
5
schools














550,000


4.2

Arlington

TX

Schools

Replace/repair
worn
compe33on
tracks

Arlington

TX

Schools

Purchase
and
installa3on
of
projec3ons
systems
in
each
AISD
classroom
to
improve
instruc3on

Arlington

TX

Schools

Arlington

TX

Schools

Arlington

TX

Schools

Structural
Repairs
(roofs,
founda3on,
brick)
at
Arlington
HS
Gym
B,
Workman
JH,
Blanton
Elem.
and
Thornton
 Elem. Construct
12
new
science
labs
to
meet
new
state‐mandated
curriculum
requirement
that
students
have
4
 credits
in
science Upgrade
old
HVAC
equipment
with
energy‐efficient
equipment
at
28
schools

Arlington

TX

Streets/Roads

Arlington

TX

Arlington














211,000
 15














535,000


5.5












4,772,600


6














420,000


7.8












3,876,000


37.5












3,865,000


37.9

Abram
Street
Bridge
over
Johnson
Creek‐right
of
way
acquisi3on
and
construc3on












6,250,000


25

Streets/Roads

Center
Street
Bridge
over
IH20‐
right
of
way
acquisi3on
and
construc3on










14,250,000


50

TX

Streets/Roads

Mansfield
Webb
Road
(Matlock
to
New
York)










26,000,000


60

Arlington

TX

Streets/Roads










18,700,000


75

Arlington

TX

Streets/Roads

Construc3on
of
Abram
Street
‐
Collins
Street
to
SH360,
including
bridge
over
Johnson
Creek
‐
right
of
way
 acquisi3on
and
construc3on Lincoln
Drive
extension,
Lamar
to
Center
Street
Bridge












3,500,000


100

Arlington

TX

Transit

Con3nua3on
of
Commuter
Bus
Program
from
Arlington
to
Fort
Worth














100,000


10

Arlington

TX

Transit












1,000,000


48

Arlington

TX

Transit












4,800,000


48

Arlington

TX

Transit

Contract
with
a
transit
service
provider
to
connect
the
exis3ng
commuter
rail
sta3on
with
key
des3na3ons
and
 employment
centers. Purchase
of
CNG‐ar3culated
BRT
vehicles
for
transit
service
to
connect
the
exis3ng
commuter
rail
sta3on
with
 key
des3na3ons
and
employment
centers. Build
an
intermodal
center












1,200,000


62

Arlington

TX

Water














460,000


13

Arlington

TX

Water














900,000


25

Arlington

TX

Water

Replacement
of
the
exis3ng
iron
removal
equipment
in
the
water
treatment
plant
because
it
is
at
the
end
of
its
 useful
life. Build
30,000
gallon,
elevated
water
storage
tank.
Modifica3ons
to
the
water
treatment
plant
due
to
the
 storage
tank
include
booster
pumps
and
plant
piping
and
control
modifica3ons. Johnson
Creek
Sanitary
Sewer,
Roosevelt
to
Center
Street














600,000


6

Arlington

TX

Water

Johnson
Creek
Sanitary
Sewer,
through
UTA
campus














700,000


6

Arlington

TX

Water

Johnson
Creek
Sanitary
Sewer,
Waverly
to
north
of
Mayfield














800,000


6

Arlington

TX

Water

Design
and
construc3on
of
transfer
valves
at
Bowen
Road/Arkansas
Lane
and
SH360/Arkansas
Lane














500,000


10

Arlington

TX

Water

Viridian
Developement
Water
Reuse
Project












1,500,000


30

Arlington

TX

Water

Reclaimed
water
line‐sanitary
sewer
connec3on
from
Arlington
to
Village
Creek
Wastewater
Treatment
Plant












3,500,000


35

Arlington

TX

Water

Arkansas
Lane
(Browning
Drive
to
State
Highway
360)‐water
and
street
infrastructure
rebuild










10,000,000


100

Aus3n

TX

Airport

Airport
Access
Road
Overhead
Signage
Improvements
to
improve
on
site
traveling
efficiency
for
the
public.












3,800,000


25

Aus3n

TX

Airport

Rehabilitate
Airside
Taxiway
shoulders
to
reduce
airfield
foreign
object
debris












3,000,000


25

Aus3n

TX

Airport

Airfield
Joint
Sealant
and
General
Avia3on
Apron
Rehabilita3on












7,500,000


50

Aus3n

TX

Airport










11,700,000


75

Aus3n

TX

Energy

Overflow
Parking
Lot
1600‐1800
spaces
to
accommodate
need
for
local
growth
and
diminishing
excess
parking
 capacity
at
Aus3n
Bergstrom
Intl
Airport. Solar
Photovoltaic
Systems
in
public
facili3es,
businesses
and
residences














250,000


5

Aus3n

TX

Energy

Residen3al
and
commercial
solar
development














300,000


6

Aus3n

TX

Energy

Lamar
Street
Bridge
Ligh3ng
Project














100,000


12

Aus3n

TX

Energy

Solar
Photovoltaic
System














570,000


12

Aus3n

TX

Energy

Replace
exis3ng
fluorescent
lamps
with
new
energy
efficient
lamps












1,500,000


15

Aus3n

TX

Energy

Walnut
Creek
Wastewater
Treatment
Plant
‐
Energy
efficiency
upgrades












2,500,000


15

Aus3n

TX

Energy

Technicenter
Building
System
Improvements
Project












1,800,000


25

Aus3n

TX

Energy

Replacement
of
non
func3on
PV
modules












3,500,000


30

Aus3n

TX

Energy

Building
Commissioning
Training
for
operators
and
managers
of
public
and
private
sector
commercial
facili3es














250,000


35

Aus3n

TX

Energy

Zilker
Botanical
Garden
Trail
Ligh3ng
Project














175,000


36.5

Aus3n

TX

Public
Safety

Public
Safety
Training
Facility










25,000,000


198

Aus3n

TX

Public
Safety

Municipal
Court/APD/
NE
Substa3on












6,240,000


226

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Health
and
safety‐related
renova3ons
and
repairs
‐
15
schools














565,481


10

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Hea3ng,
ven3la3on
and
air‐condi3oning
‐
4
schools














935,649


17

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Campus
renova3ons
‐
3
schools












1,879,070


35

Aus3n

TX

Schools










15,000,000


40

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Providing
access
for
low
income
students
to
broadband
communica3ons
 from
home Aus3n
Independent
School
District
‐
Upgrading
classroom
technology










20,000,000


40

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Roofing
repairs
‐
4
schools












2,980,462


55

Aus3n

TX

Schools

Aus3n
Safe
Routes
To
School
supplemental
funding:

monies
will
be
spent
to
supplement
city/school
 infrastructure
monies












3,000,000


60

City

State

Program

Aus3n

TX

Schools

Aus3n
Independent
School
District
‐
Electrical
power
load
balancing
‐
35
schools,
1
facility

Project
Descrip3on

Funding
Required 










3,325,952


Jobs 61

Aus3n

TX

Streets/Roads

Aus3n

TX

Streets/Roads

Aus3n

TX

Streets/Roads

Purchase
and
install
computer
technology
necessary
to
allow
web
access
to
exis3ng
200
plus
arterial
traffic
 cameras
and
other
traffic
informa3on
devices Purchase
and
install
Variable
Message
Signs
on
major
highways
and
arterials
to
manage
special
events
in
 Central
Aus3n
and
provide
improved
driver
informa3on. Purchase
and
install
vehicle
detec3on
sta3ons
using
toll‐tag
registra3on
tags














800,000


10












5,000,000


25












6,000,000


aus3n

TX

Transit

20
Signals
(various
loca3ons)























2,400,000


25

Aus3n

TX

Transit

Aus3n
Urban
Rail
Project:
purchase
vehicles
and
maintenance
equipment










60,000,000


0

Aus3n

TX

Transit

Capital
Metro
‐
Replacement
of
paratransit
vehicle
fleet
(purchase
of
74
vehicles)












4,000,000


10

Aus3n

TX

Transit

Capital
Metro
‐
Replacement
and
expansion
of
bus
fleet
(purchase
of
101
buses)










36,000,000


15

Aus3n

TX

Transit

Capital
Metro
‐
Bus
Stop
Signage
project












1,040,000


49

Aus3n

TX

Transit

Purchase
and
install
Transit
Fare
&
Parking
Management
Kiosks












5,000,000


50

Aus3n

TX

Transit

Capital
Metro
‐
New
Manor
Park
and
Ride












2,800,000


132

Aus3n

TX

Transit

Capital
Metro
‐
Expansion
of
Intelligent
Transporta3on
System
(ITS)
Technologies












5,000,000


235

Aus3n

TX

Transit

Capital
Metro
‐
Rails
with
Trails
(Hike
and
Bike
trail
along
Redline
ROW)












6,900,000


324

Aus3n

TX

Transit

Upgrade
exis3ng
MetroRail
commuter
rail
line










80,000,000


400

Aus3n

TX

Transit

Capital
Metro
‐
New
South
IH‐35
Park
and
Ride










11,100,000


522

Aus3n

TX

Transit

Capital
Metro
‐
Phase
II
Expansion
of
MetroRail
Red
Line








190,000,000


5875

aus3n

TX

Water

Carver
Historic
Museum
Interior
Renova3on.

Aus3n

TX

Water

Aus3n

TX

Water

Aus3n

TX

Water

Adjustment
of
4
water
valves
and
one
blow‐off
drain
line
to
grade
in
order
to
accommodate
Loop
360
@
 Westlake
Drive
State
Highway
Improvement
project Reloca3on
of
500
LF
of
8”
waterline
on
Old
Manor
Road
@
Walnut
Creek
to
accommodate
State
Highway
 improvement
project Lib
Sta3on
RTU
Telemetry
Replacement
Project

Aus3n

TX

Water

Aus3n

TX

Aus3n














290,000
 














50,000


1














200,000


1














540,000


2

Lifle
Walnut
/
Bufermilk
–
Phase
II
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines.














556,000


3

Water

Package
Plant
Hypochlorite
System
to
generate
liquid
or
gas
chlorine
on
site.














480,000


3

TX

Water

Capitol
Metro/COA
MLK
Storm
Drain
Improvements














137,000


4

aus3n

TX

Water














886,000


4

Aus3n

TX

Water

Raul
Alvarez
Disc
Golf
Course:

This
project
will
develop
a
36‐hole
disc
golf
course
that
will
be
environmentally
 and
financially
sustainable.

 S.
Congress
Ave
Wastewater
Upgrade:
upsize
wastewater
line
for
addi3onal
capacity.














750,000


4

Aus3n

TX

Water

SAR
WWTP
roof
replacement
for
the
Secondary
Treatment
building














350,000


4

Aus3n

TX

Water

SAR
WWTP
Valve
and
Gate
replacement














500,000


4

Aus3n

TX

Water

West
Bank
Lib
Rehab














600,000


4

Aus3n

TX

Water

24”
Force
Main
Rehabilita3on
&
12”
Force
Main
Rehabilita3on














500,000


5

Aus3n

TX

Water

Govalle
/
Crosstown
Various
Segments
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines.














863,000


5

Aus3n

TX

Water

Pemberton
Heights
PH
1
‐
Exis3ng
2500
LF
water
line
is
deteriorated
and
aged.












1,000,000


5

Aus3n

TX

Water

Replace
doors
in
Hornsby
Bend,
Walnut
and
SAR
WWTP
facili3es
w/Chemproof(fiberglass
door)














360,000


5

Aus3n

TX

Water

Demoli3on
on
Santa
Rita
St.
{E.
4th/Perdenales
LF}
















25,000


6

Aus3n

TX

Water

Onion
Creek
SSO
Rehabilita3on
Project
to
replace
and
reroute
deteriorated
wastewater
lines












1,229,000


6

Aus3n

TX

Water

SAR
WWTP
Scum
Processing
Improvements












1,800,000


6

Aus3n

TX

Water

South
Area
Regional
WWTP
(SAR)
Preliminary
Treatment
Building
Improvements












1,200,000


6

Aus3n

TX

Water












1,200,000


6

Aus3n

TX

Water

South
Area
Regional
WWTP
(SAR)
Replace
fine
pore
diffusers
in
one
train
including
the
air
piping
grid
in
the
 aera3on
basins. Guerrero
Park
Main












1,800,000


7

Aus3n

TX

Water












2,200,000


7

Aus3n

TX

Water

Reloca3on
of
6,000
LF
of
16”
waterline
on
FM
2304
–
Ravenscrob
to
FM
1625
to
accommodate
State
Highway
 Improvement
project
by
Texas
Department
of
Transporta3on Thoroughbred
Farms
WWTP
improvements














750,000


7

Aus3n

TX

Water

Odor
Control
Facility
for
Crosstown
Sewer
at
Walnut
Creek
WWTP
and
5
other
interceptor
sewer
loca3ons












2,400,000


8

Aus3n

TX

Water












2,700,000


8

Aus3n

TX

Water

Reloca3on
of
1500
LF
of
16”
waterline
on
FM
2222
@
Bull
Creek‐to
accommodate
State
Highway
improvement
 project South
Aus3n
Regional
Wastewater
Treatment
Plant
HVAC
Replacement












1,800,000


8

Aus3n

TX

Water

Wastewater
Pipeline
Rehabilita3on
contract
for
Cured
In
Place
Pipeline
(CIPP)
Lining












6,000,000


8

Aus3n

TX

Water

The
assessment
of
over
800
proper3es
that
may
have
abandoned
underground
storage
tanks
(UST).














450,000


9

Aus3n

TX

Water

Water
Reclama3on
Ini3a3ve
Ph
1B
East
51st
Street
Transmission
Main












1,800,000


9

Aus3n

TX

Water












1,800,000


10

Aus3n

TX

Water

ABIA
Extension
‐‐
approximately
8,000
feet
of
16”
reclaimed
water
main
to
serve
the
Aus3n‐Bergstrom
 Interna3onal
Airport Central
Business
District
Alleys
–
Water
Lines.












2,500,000


10

Aus3n

TX

Water

Co‐Genera3on
update
at
Hornsby
Bend
Sludge
Processing
Plant












3,000,000


10

Aus3n

TX

Water

Dixie
Dr.
Erosion
Voluntary
Buyouts
(Demoli3on)














740,000


10

Aus3n

TX

Water












3,443,535


10

Aus3n

TX

Water












3,390,235


10

Aus3n

TX

Water

Group
15:
Northwest
area
–
51st
St.,
Manor
Rd.,
Rogge
Ln.,
Basswood
Ln.
,
Exeter
Dr.,
Overbrook
Dr.,
Overdale
 Rd.,
Trafalgar
Dr.,
Wight
Cv., Group
8:
Tarrytown
Neighborhood
–
Stamford
Ln.,
Forest
Trail,
Elton
Ln.,
Vista
Ln.,
Bremen
St.,
McCall
Rd.,
 Woodmont
Ave.,
Grswold
Ln.
&
Westover
Rd ILA
with
Williamson
County
{Pond
Springs
Rd}














500,000


10

Aus3n

TX

Water

Metric
Dam
Moderniza3on














500,000


10

Aus3n

TX

Water

Rehabilita3on
of
Wastewater
Manholes
contract












2,000,000


10

Aus3n

TX

Water

South
Aus3n
Regional
Wastewater
Treatment
Plant
‐
New
Roof
for
Secondary
Treatment
Building












1,500,000


10

Aus3n

TX

Water

Storm
Drain
Improvements
[W.
22
½
at
Pearl
St.]














300,000


10

Aus3n

TX

Water












2,387,000


11

Aus3n

TX

Water

Chaparral
Trail
/
Wykeham
Dr
Wastewater
Line
Improvements:

reroute
deteriorated
wastewater
lines
from
 easements. Blunn
Creek
Water
Quality
Project














420,000


12

Aus3n

TX

Water

Havana
Street
–
Storm
Drain
Improvements














500,000


12

City

State

Program

Aus3n

TX

Water

High
Point
Cove
Storm
Drain
Improvements

Project
Descrip3on

Funding
Required 












750,000


Jobs 12

Aus3n

TX

Water

Prince
Valiant
–
Storm
Drain
Improvements

Aus3n

TX

Water

Replacement
of
exis3ng
Inoperable
Water
Valves
within
Aus3n’s
water
Distribu3on
system














750,000


12












2,000,000


Aus3n

TX

Water

UNO
West
Campus
Areas
–
Water
Lines.

Exis3ng
water
lines
are
deteriorated
and
aged












3,000,000


12 12

Aus3n

TX

Water

West
Bouldin
Creek
Integrated
Water
Quality
Project














480,000


12

Aus3n

TX

Water

Wildhorse
Northeast
Interceptor
Sewer
Phase
2












3,500,000


12

Aus3n

TX

Water












2,254,000


12

Aus3n

TX

Water

Willowbrook
and
Ohlen
Rd
Wastewater
Line
Rehabilita3on
Project:
replace
and
reroute
deteriorated
 wastewater
lines. Reservoir
Improvements:
includes
rehabilita3on
of
two
of
the
City’s
exis3ng
water
reservoirs












4,000,000


13

Aus3n

TX

Water

Upper
Waller
Wastewater
Line
Rehabilita3on
32nd
to
35th
/
Evans:

replace
deteriorated
wastewater
lines.












2,500,000


13

Aus3n

TX

Water

Wildhorse
N
Interceptor
Extension
North
of
290












4,000,000


13

Aus3n

TX

Water

Fort
Branch
Erosion
/Flood
Control
Voluntary
Buyouts
(Demoli3on)














500,000


14

Aus3n

TX

Water












1,400,000


14

Aus3n

TX

Water












1,000,000


14

Aus3n

TX

Water

Onion
Creek
Soccer
Complex.

The
Onion
Creek
Soccer
Complex
includes
10
soccer
fields
and
5
addi3onal
acres
 that
represent
25
total
acres
of
irrigated
area Water
and
wastewater
pipeline
reloca3ons
to
accommodate
City
of
Aus3n’s
Pleasant
Valley
Road
Bike
Route
 project
to
add
10’
bike
and
pedestrian
route. Parkway
Project














650,000


15

Aus3n

TX

Water

Parmer
Lane
Interceptor
Sewer
that
includes
approx
2,000
feet
of
42‐inch
Open
cut
and
Tunnel
Sewer












3,000,000


15

Aus3n

TX

Water

Rio
Grande
from
MLK
to
29th












8,000,000


15

Aus3n

TX

Water

Thaxton
Road
Culvert
Improvement














760,000


15

Aus3n

TX

Water

Woodhollow
Dam
Pond
Maintenance














830,000


15

Aus3n

TX

Water












1,300,000


16

Aus3n

TX

Water

Hancock
Golf
Course
Irriga3on
System
Improvements.

The
Hancock
Golf
Course
is
currently
irriga3ng
30
acres
 of
turf
grass
with
potable
water.

This
project
will
provide
a
new
irriga3on
system
u3lizing
reclaimed
water. Williamson
Creek
IH35
&
Ben
White
WQ
pond,
Ph.
2














610,000


16

Aus3n

TX

Water

Crosstown
Wastewater
Line
Rehabilita3on:
replace
and
reroute
deteriorated
wastewater
lines.












3,614,000


18

Aus3n

TX

Water

Hornsby
Bend
Biosolids
Facility
Digester
Cleaning
and
Rehabilita3on










20,000,000


18

Aus3n

TX

Water

Bannockburn
Storm
Drain
Improvements












1,600,000


20

Aus3n

TX

Water

Davis
Bldg
Roof
Replacements












2,300,000


20

Aus3n

TX

Water

Great
Northern
Dam
Moderniza3on












1,300,000


20

Aus3n

TX

Water

Intersec3on/Safety
Improvement
Projects
(various
loca3ons)












1,500,000


20

Aus3n

TX

Water

Lakewood
Drive
Low
Water
Crossing
Upgrade














950,000


20

Aus3n

TX

Water

Long
Bow
Storm
Drain
Improvements












3,600,000


20

Aus3n

TX

Water

Oak
Lawn
Storm
Drain












1,800,000


20

Aus3n

TX

Water

Re3red
Lib
sta3on,
Pump
Sta3on
and
Reservoir
Facility
Decommissioning












5,000,000


20

Aus3n

TX

Water

Spicewood
Springs
Pump
Sta3on
Improvements












8,200,000


20

Aus3n

TX

Water

Standby
Generators
for
Wastewater
Lib
Sta3ons












3,500,000


20

Aus3n

TX

Water

Pfluger
Bicycle
&
Pedestrian
Bridge
Extension












2,300,000


21

Aus3n

TX

Water

Shaw
Lane
Site
Drainage
and
Levee
Improvements
to
contain
100‐year
storm












2,500,000


21

aus3n

TX

Water












2,600,000


24

Aus3n

TX

Water

Bicycle
Infrastructure
Improvements:
a
package
of
ready‐to‐install
bike
lanes,
shared‐use
bicycle
and
 pedestrian
paths,
and
minor
infrastructure
improvements
to
remove
barriers
on
bike
routes.

 Blunn‐Warehouse
Row
Water
Quality
(WQ)
Pond














850,000


24

Aus3n

TX

Water

Lundelius‐McDaniel
Water
Quality
Pond














900,000


24

Aus3n

TX

Water












4,822,000


24

Aus3n

TX

Water












2,300,000


25

Aus3n

TX

Water

Vista
Ln
Wastewater
Line
Rehabilita3on
Project;

Replace
wastewater
lines
in
coordina3on
with
street
 reconstruc3on
project. Athle3c
Field
Irriga3on
System
Improvements.

The
Parks
and
Recrea3on
Department
operates
youth
athle3c
 fields
throughout
the
City
of
Aus3n. CBD
Alley
Improvements












3,000,000


25

Aus3n

TX

Water

Hornsby
Bend
Biosolids
Facility
Sustainability
project
to
rehabilitate
numerous
components
of
the
plant












5,000,000


25

Aus3n

TX

Water

W.23rd
Street
Streetscape
and
Stormwater
Improvements












2,000,000


25

Aus3n

TX

Water












5,000,000


26

Aus3n

TX

Water

Waters
Park
Interceptor
Sewer
that
includes
replacement
of
approximately
6,000
feet
of
undersized
sewer
with
 42‐inch
sewer Lifle
Walnut
and
Upper
Ft
Branch
Wastewater
Line
Rehabilita3on:
replace
deteriorated
wastewater
lines.












5,395,000


27

Aus3n

TX

Water












7,000,000


30

Aus3n

TX

Water

AFD
Firehouse
Improvement
Project:
to
include
sidewalk,
ADA
ramps,
mul3gender
facility
conversion,
 moderniza3on The
Trail
Enhancement
Plan
at
Lady
Bird
Lake.












7,000,000


30

Aus3n

TX

Water

WPDR
O&M
Maintenance
Facility
[Green
Design]












1,800,000


30

Aus3n

TX

Water

Bicycle
and
Pedestrian
Tunnel
(Bowie
Street
Underpass)












3,500,000


32

Aus3n

TX

Water

Hoeke
Lane
Low
Water
Crossing
Upgrade












2,300,000


32

Aus3n

TX

Water

Rehabilita3on
of
Primary
and
Final
Clarifiers
and
Sludge
Thickeners
at
the
South
Area
Regional
(SAR)
WWTP










10,000,000


32

Aus3n

TX

Water

32nd
St
Street
Reconstruc3on/U3lity
Upgrade
Project












1,275,000


35

Aus3n

TX

Water

Group
1
Phase
2
Street
Reconstruc3on
and
U3lity
Adjustment
Project












1,741,966


37

Aus3n

TX

Water

Group
6
Street
Reconstruc3on
Project












2,086,000


37

Aus3n

TX

Water

Brodie
Lane
Sidewalk
Project
–
Sidewalk
on
both
sides
of
Brodie
Ln.
from
Travis
County
line
north
to
Slaughter












1,500,000


40

Aus3n

TX

Water

Group
3
Northeast
Aus3n
Street
Reconstruc3on/U3lity
Upgrade
Project












3,575,000


40

Aus3n

TX

Water

Roy
G.
Guerrero
Colorado
River
Park












4,000,000


40

Aus3n

TX

Water

Wastewater
Pipeline
Rehabilita3on,
Relay
and
Spot
Repair
Services
Contract












8,000,000


40

Aus3n

TX

Water

Rio
Grande
Street
Reconstruc3on
and
U3lity
Adjustment
Project,
MLK,
Jr.
to
W.
24th
St.












5,500,000


42

Aus3n

TX

Water

Second
Street
Road
Reconstruc3on
Project












7,500,000


44

Aus3n

TX

Water










13,300,000


45

Aus3n

TX

Water

Water
Reclama3on
Ini3a3ve
–
Red
River
to
UT
Transmission
Main
‐‐
approximately
21,000
feet
of
reclaimed
 water
main Group
4
Southeast
Aus3n
Street
Reconstruc3on/U3lity
Upgrade
Project












6,175,000


47

Aus3n

TX

Water

Todd
Lane
Roadway
Improvements












2,000,000


50

City

State

Program

Aus3n

TX

Water

aus3n

TX

Water

Aus3n

TX

Water

E.
7th
Street
Corridor
Project
(from
Pleasant
Valley
to
Pedernales
St)
to
include
street
reconstruc3on
and
 drainage/u3lity
upgrades,
streetscape
ameni3es
(sidewalk,
landscaping,
ligh3ng),
and
ADA
improvements. Boardwalk
along
Lady
Bird
Lake:

The
project
will
close
a
1.3‐mile
gap
in
a
heavily
used
pedestrian
and
bicycle
 trail
system.
The
trail
extension
will
improve
safety
and
provide
addi3onal
access
to
a
major
bike
and
 pedestrian
corridor
for
the
expanding
m Pleasant
Valley
Road
Extension

Project
Descrip3on

Aus3n

TX

Water

Aus3n

TX

Aus3n

Funding
Required

Jobs












8,120,000


54










18,000,000


60












2,500,000


60

Wells
Branch
Roadway
Project












2,000,000


60

Water

Westgate
Blvd
from
Cameron
Loop
to
Cohoba
Dr.












2,000,000


65

TX

Water

Morris
Williams
Golf
Course
Renova3on:












4,000,000


70

Aus3n

TX

Water

ADA
Title
II
Handicap
Facili3es‐Compliant
Upgrades












5,000,000


75

Aus3n

TX

Water

Davis/Deer
Ln.
from
Brodie
Ln.
to
Corran
Ferry












1,000,000


75

Aus3n

TX

Water

Bicycle,
Shared
Path,
Connected
Trails,
and
Sidewalk
Projects












2,500,000


90

Aus3n

TX

Water

William
Cannon
New
Sidewalk,
IH‐35
to
Pleasant
Valley
Rd












3,000,000


110

Aus3n

TX

Water

S.
1st
Street
Sidewalk
Project












5,000,000


125

Aus3n

TX

Water

Brazos
St,
U3lity
and
Road
Reconstruc3on












9,700,000


150

Aus3n

TX

Water












6,500,000


180

Aus3n

TX

Water

North
Lamar
Sidewalk
Project
– Sidewalk
on
both
sides
of
N.
Lamar
from
Rundberg
Ln.
north
to
Braker
Ln.
providing
a
high
priority
ADA
 accessible
route Rosedale
Storm
Drain
Improvements,
Phase
1












8,600,000


244

Aus3n

TX

Water

Burnet
Rd.
Sidewalk
Project
–
Sidewalk
on
both
sides
of
Burnet
Rd
from
Koenig/Allendale
north
to
US
183










10,000,000


250

Aus3n

TX

Water

E.
4th
Street
Storm
Drain
Improvements












9,000,000


256

Aus3n

TX

Water

The
Waller
Creek
Tunnel
(WCT)
Project








127,500,000


1836

Baytown

TX

CDBG

Replace
an
exis3ng
fire
engine
with
more
modern,
safe
and
efficient
equipment














600,000


0

Baytown

TX

CDBG














375,000


20

Baytown

TX

CDBG












2,500,000


25

Baytown

TX

CDBG














600,000


25

Baytown

TX

CDBG












1,250,000


25

Baytown

TX

CDBG












1,700,000


35

Baytown

TX

CDBG












1,250,000


45

Baytown

TX

CDBG

Conduct
a
construc3on
program
to
replace
leaking
sewer
service
lines
to
eliminate
the
inflow
and
infiltra3on
 that
results
in
sewer
overflows,
loss
of
service
and
damage
to
private
property. Construc3on
of
sidewalks
in
the
CDBG
target
area
to
link
neighborhoods
with
schools,
parks
and
shopping
 facili3es. Provide
hardening
modifica3ons
to
protect
cri3cal
public
safety
facili3es
in
the
event
of
hurricane
or
other
 severe
weather. Repair/replacement
of
the
wastewater
collec3on
system
in
the
Central
Heights
subdivision
to
eliminate
loss‐of‐ service
and
wastewater
overflows
in
the
CDBG
target
area. Replacement
of
20,000
linear
feet
of
2"
water
line
with
6"
and
8"
lines
to
improve
life
safety,
fire
protec3on,
 and
water
service
to
a
CDBG
target
area
neighborhood. Construc3on
of
an
addi3onal
wastewater
lib
sta3on
to
support
economic
development
and
redevelopment
in
 this
under‐served
CDBG
target
area. Repairs
and
improvements
to
the
Central
Police
Headquarters
Building












1,000,000


45

Baytown

TX

CDBG












2,600,000


50

Baytown

TX

CDBG












3,000,000


55

Baytown

TX

CDBG












3,500,000


65

Baytown

TX

CDBG












1,000,000


65

Baytown

TX

CDBG












3,000,000


85

Baytown

TX

CDBG












3,850,000


100

Baytown

TX

CDBG










22,600,000


150

Baytown

TX

CDBG










20,000,000


250

Baytown

TX

Public
Safety

Construct
a
Police
driving
training
course
on
property
currently
owned
by
the
local
school
district.
This
 partnership
program
would
provide
state‐of‐the‐art,
hands‐on
training
for
police
agencies
from
a
large
 geographic
area.
Befer
trained
police
officer Funding
for
the
Downtown/Texas
Avenue
revitaliza3on
through
the
expansion
of
the
Streetscape
Project
to
 addi3onal
blocks.

The
City
has
received
approximately
$800,000
in
a
federal
grant
to
reconstruct
one
block
of
 Texas
Avenue
and
the
grant
is
matched
 Expansion
of
Baytown
City
Hall
in
a
CDBG
target
area
to
support
and
s3mulate
redevelopment
in
the
area
 rather
than
reloca3ng
to
the
"new"
part
of
town. Rehabilita3on
and
expansion
of
the
local
Emergency
Medical
Service
facility
to
meet
health
and
safety
codes
 and
to
provide
a
more
produc3ve
work
environment. Construct,
staff
and
equip
a
new
fire
sta3on
in
an
underserved,
outlying
area,
improving
life
safety
and
 poten3ally
reducing
fire
insurance
costs. Reconstruc3on
of
the
Bayland
Marina
that
was
destroyed
by
Hurricane
Ike.
This
public
marina
is
located
in
a
 CDBG
target
area
and
is
a
key
to
economic
s3mulus
and
redevelopment
of
the
area. Complete
a
Base‐Restore
and
Overlay
program
for
substandard
streets
in
the
CDBG
target
area.

This
would
 encompass
61
miles
of
deteriorated
streets
and
serve
as
a
great
redevelopment
and
image
improvement
 program
for
this
community. Replacement
of
sanitary
sewer
service
lines
to
residences
in
the
CDBG
target
area
to
enhance
service
delivery,
 improve
health
and
sanita3on
and
to
avoid
the
costly
expansion
of
wastewater
treatment
facili3es
to
treat
the
 inflow
of
rainwater. Add
a
graffi3
abatement
team
to
curb
this
illegal
ac3vity
in
the
economically‐depressed
areas
of
our
city

Baytown

TX

Public
Safety

Retrofit
to
the
exis3ng
Police
Academy
to
harden
the
structure
to
Category
Four
Hurricane
resistance.

Baytown

TX

Public
Safety

Baytown

TX

Public
Safety

Baytown

TX

Public
Safety

Baytown

TX

Schools

Baytown

TX

Streets/Roads

Lead
remedia3on
and
environmental
upgrade
of
the
range
which
would
include
a
bullet
trap
and
baffle
system
 that
would
greatly
reduce
if
not
eliminate
future
remedia3on
necessity. Construct
a
hardened
Emergency
Opera3ng
Center
Support
facility
to
provide
a
safe
and
reszul
environment
 for
sheltered
public
safety
personnel
during
extended
incidents
such
as
hurricanes Construc3on
of
a
redundant
fiber
op3cs
ring
and
regional
connec3vity
to
provide
cri3cal
public
safety
 communica3ons
infrastructure
during
natural
or
manmade
disasters. Provide
public
shelter
mi3ga3on
renova3on
for
four
local
schools
to
provide
increased
resistance
to
damage
 and
the
emergency
use
as
employee
and
public
shelters.
This
includes
generators,
rated
window
protec3on
 and
roof
hardening.

Many
of
the
improve Widening
and
redesign
of
the
Garth
Road
and
Baker
Road
area
to
reduce
conges3on
and
improve
air
quality

Baytown

TX

Streets/Roads

Baytown

TX

Streets/Roads

Baytown

TX

Streets/Roads

Baytown

TX

Streets/Roads

Widen
and
reconstruct
Cedar
Bayou
Lynchburg
Road
from
John
Mar3n
to
Barkuloo
Road
to
reduce
conges3on
 and
improve
this
cri3cal
east‐west
thoroughfare. Construc3on
of
a
freeway
"flyover"
connector
on
an
essen3al
hurricane
evacua3on
route
to
eliminate
three
 pinch
points.
This
will
connect
Highway
146
South
to
Sup
330
North,
a
state‐mandated
evacua3on
route
for
 Harris
and
Chambers
Coun3es. Realignment
and
Reconstruc3on
of
FM
565
in
western
Chambers
County
to
reduce
traffic
conges3on
on
Hwy.
 146
and
to
s3mulate
development
along
the
new
roadway. Construc3on
of
extension
of
East
Baker
Road
to
improve
public
safety
service
delivery
and
traffic
circula3on,
 provide
an
addi3on
east‐west
thoroughfare
and
spur
economic
development.














250,000


4














750,000


30












4,000,000


40












3,500,000


125












7,400,000


175












8,000,000


275












5,000,000


85












6,000,000


150










12,000,000


175










12,000,000


175












7,500,000


200

City

State

Program

Baytown

TX

Streets/Roads

Project
Descrip3on

Baytown

TX

Streets/Roads

Baytown

TX

Streets/Roads

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Baytown

TX

Water

Beaumont

TX

Amtrak

Realignment
and
reconstruc3on
of
John
Mar3n
Road
to
reduce
traffic
conges3on
and
spur
economic
 development
in
this
depressed
area. Installa3on
of
an
emergency
generator
for
the
East
District
Wastewater
Treatment
Plant
to
provide
the
 capability
to
treat
wastewater
effluent
during
emergencies.
This
will
avoid
the
discharge
of
untreated
effluent
 into
coastal
waterways Modifying
12
large
lib
sta3ons
to
provide
emergency
power
supplies
to
avoid
the
discharge
of
untreated
 effluent
during
emergencies. Rehabilita3on
and
repair
of
the
Goose
Creek
Wastewater
trunk
line
to
eliminate
wastewater
overflows
and
 improve
service
delivery. Reconstruc3on
of
the
Raccoon
Lib
Sta3on
to
eliminate
the
wastewater
overflows
that
result
for
inflow
and
 infiltra3on
and
the
deteriorated
condi3on
of
the
facility. Reloca3on
and
reconstruc3on
of
the
Gulf
Coast
Lib
Sta3on
and
Force
Main
to
elevate
it
out
of
the
flood
plain
 and
eliminate
the
wastewater
overflows
that
result
for
inflow
and
infiltra3on
and
the
deteriorated
condi3on
of
 the
facility. Replacement
and
upsizing
of
the
Alexander
Trunkline
to
eliminate
sewer
overflows,
improve
service
delivery
 and
provide
capacity
for
economic
development
and
expansion. Construc3on
of
a
1
million
gallon
elevated
storage
tank
to
improve
fire
protec3on
water
supplies
and
to
serve
 addi3onal
areas
to
support
economic
development. Reconstruc3on
of
the
Steinman
Lib
Sta3on
and
Force
Main
to
eliminate
the
wastewater
overflows
that
result
 for
inflow
and
infiltra3on
and
the
deteriorated
condi3on
of
the
facility. Rehabilita3on
of
the
Baytown
Area
Surface
Water
Treatment
facility
for
energy
and
produc3on
efficiency
and
 to
provide
back‐up
power
capabili3es
to
provide
potable
water
during
post‐disaster
emergencies
such
as
 Hurricane
Ike. Rehabilitate
the
Central
District
Wastewater
Treatment
facility
to
improve
treatment
efficiencies,
reduce
 wastewater
overflows
and
improve
the
energy
efficiency.
Project
includes
replacement
of
the
influent
lib
 sta3on
and
piping,
eleva3ng
the
administr Construct
a
sanitary
sewer
force
main
and
lib
sta3on
to
extend
wastewater
u3li3es
into
an
unserved
area
to
 facilitate
economic
development
and
job
crea3on
in
the
residen3al,
commercial,
retail,
manufacturing
and
 industrial
sectors. Construc3on
of
a
Baytown
Area
Water
Authority
transmission
line
to
and
along
Interstate
Highway
10
to
 facilitate
improved
public
safety
and
to
spur
economic
development
in
east
Harris
County
and
West
Chambers
 County. Beaumont
Amtrak
Stop

Beaumont

TX

CDBG

Beaumont

TX

Beaumont

TX

Beaumont

Widen
and
reconstruc3on
N.
Main
Street
and
Wallisville
Road
in
the
vicinity
of
the
Goose
Creek
High
School
to
 improve
safety,
reduce
conges3on
and
create
economic
development
incen3ves
for
the
largely
rural
area. Complete
a
Base‐Restore
and
Overlay
program
for
substandard
streets
citywide.
(85
miles
of
roadway)

Funding
Required

Jobs










12,000,000


200










31,600,000


250










14,000,000


250












1,000,000


15












6,000,000


35












4,500,000


35












3,000,000


40












1,500,000


45












8,000,000


50












2,600,000


65












6,000,000


85










10,000,000


85












8,300,000


120












9,800,000


175










21,750,000


225














750,000


8

Reinvestment
Zone
Housing












5,000,000


50

Energy

Landfill
Hydrogen
Project












5,000,000


50

Public
Safety

Public
Safety
Headquarters
Parking
Lot
Expansion
to
decrease
response
3me.














272,000


15

TX

Transit

Bus
Stops
Rehab












1,000,000


10

Bedford

TX

CDBG

Expansion
of
linear
trails














350,000


7

Bedford

TX

CDBG

Records
Management
System














400,000


8

Bedford

TX

CDBG

Equipment
Replacement
and
improvements
@
various
parks














940,000


10

Bedford

TX

CDBG

ADA
Ramps
in
various
loca3ons














600,000


12

Bedford

TX

CDBG

Boys
Ranch
Park
Lake
Reclama3on












1,500,000


18

Bedford

TX

Public
Safety

Animal
Control
Center
Expansion














300,000


10

Bedford

TX

Public
Safety

Police
&
Fire
Radio
System
Upgrade














700,000


11

Bedford

TX

Schools

New
Library
Building












8,000,000


80

Bedford

TX

Streets/Roads

Upgrade
School
Zone
Flashers














130,000


5

Bedford

TX

Streets/Roads

Install
Video
Detec3on.














660,000


10

Bedford

TX

Streets/Roads

Signal
Synchroniza3on
and
bafery
backup

Bedford

TX

Streets/Roads

Crack
Sealing
on
various
streets

Bedford

TX

Streets/Roads

Bedford

TX

Bedford














560,000


11












1,100,000


12

Rebuild
Woodland
Terrace
and
Cindy
Lane














300,000


12

Streets/Roads

Rebuild
Ravenswood
Drive
and
King
Drive














800,000


15

TX

Streets/Roads

Repair
and
Refurbish
Traffic
Control
Signals












1,300,000


15

Bedford

TX

Streets/Roads

Barr
Road
Improvements














400,000


18

Bedford

TX

Streets/Roads

Safe
Routes
to
School
Sidewalk
Installa3on












1,600,000


20

Bedford

TX

Water

Median
Irriga3on
Systems
Controller
Conversion














350,000


7

Bedford

TX

Water

Install
3,000
feet
of
12"
sanitary
sewer
main
in
SB‐1
north
of
SH
183.














300,000


8

Bedford

TX

Water














400,000


8

Bedford

TX

Water

Install
3,300
feet
of
10"
and
15"
sanitary
sewer
mains
along
Brookside
Drive
from
Cummings
Road
to
Cheek
 Sparger
Road
 Installa3on
of
two
sanitary
sewer
metering
sta3ons
on
Hurst‐Bedford
connec3ons














300,000


8

Bedford

TX

Water

Repair
sanitary
sewer
line
creek
crossings
in
various
loca3ons.














400,000


8

Bedford

TX

Water

Install
1,600
feet
of
18"
sanitary
sewer
main
along
Hurricane
Creek
@
L.
Don
Dodson
Drive.














220,000


10

Bedford

TX

Water

Replace
12"
water
main
in
Commerce
Place
from
Reliant
Parkway
to
Forum
Drive.














250,000


10

Bedford

TX

Water

Replace
water
mains
on
Red
Oak
Lane/Scenic
Hills
and
Stonegate
North
Addi3ons.














375,000


10

Bedford

TX

Water

Replace
water
mains
on
Russell
Drive
and
Ravenswood
Drive














370,000


10

Bedford

TX

Water

Erosion
Control
projects
@
various
loca3ons














800,000


12

Bedford

TX

Water

Replace
12"
water
main
in
Mar3n
Drive














500,000


12

Bedford

TX

Water

Replace
sanitary
sewer
mains
in
various
loca3ons.












1,200,000


12

Bedford

TX

Water

Replace
water
mains
in
the
Gefsburg
Place
and
Noqngham
Addi3ons.














600,000


12

Bedford

TX

Water

Replace
water
mains
in
the
Shady
Brook
Addi3on















950,000


13

Bedford

TX

Water

Automated
Meter
Reading
System
Conversion












3,250,000


15

Bedford

TX

Water

Schumac
Lane/Monterrey
Storm
Drain
Improvements












1,600,000


15

City

State

Program

Bedford

TX

Water

Project
Descrip3on

Bedford

TX

Water

Bedford

TX

Water

Bedford

TX

Water

Blue
Mound

TX

Public
Safety

Blue
Mound

TX

Water

Brownsville

TX

CDBG

Police
Department
Building Community
Rela3ons
Officer Purchase
local
privately
owned
water
u3li3es
system
and
update
water
infrastructure.
Current
fire
hydrants
are
 not
in
compliance. Gynasium
in
a
low
income
area.

Brownsville

TX

CDBG

Brownsville

TX

Water

Bryan

TX

Bryan Bryan

Rehab
sanitary
sewer
mains
in
the
Shady
Brook
Addi3on
and
the
ouzall
main
along
Suphur
Branch
from
 Harwood
Road
to
Pipeline
Road. Rehab
sanitary
sewer
mains
in
the
Harwood
Terrace,
Rollingwood,
Bell
Hurst,
Oakwood
Park
East
and
Bell
 Manor
Addi3ons. Culvert
Improvements
to
pass
the
100
Year
Flood
on
Sulphur
Branch
and
SB‐1
@
Schumac
Lane,
Donna
Lane,
 Briar
Drive,
Shirley
Way

and
Circle
Lane. Channel
Improvements
and
Historical
Bridge
Reloca3on
on
Sulphur
Branch.

Funding
Required

Jobs












2,800,000


17












1,800,000


21












2,000,000


22












1,100,000


28












2,500,000


51












4,000,000


35












3,000,000


50

Sec3on
108
Loan
for
street
reconsturc3on












4,000,000


120










58,000,000


250

Water

Wier‐Dam:

This
project
will
hold
water
from
the
Rio
Grande
River
that
will
be
used
for
drinking
by
the
city
of
 Brownsville
and
will
raise
the
water
level
of
the
river
that
will
serve
as
a
deterent
for
illegal
drug
traffic
crossing
 the
border.

The
raised 5
million
and
1
million
gallon
ground
storage
tank

TX

Water

Burton
Creek
Wastewater
Treatment
Plant










13,000,000


TX

Water

Hwy
21
waterline
extension












1,500,000


Bryan

TX

Water

Hwy
47
waterline
extension












1,500,000


Bryan

TX

Water

S3llcreek
Sewer
Phase
3












6,500,000


Bryan

TX

Water

Thompson's
Creek
Wastewater
Treatment
Plant










13,000,000


Bryan

TX

Water

Well
19
collec3on
line












1,500,000


Bryan

TX

Water

Westside
Interceptor












5,500,000


Carrollton

TX

Streets/Roads

Whitlock
Road
Reconstruc3on












5,000,000


1000

Carrollton

TX

Water

Emergency
Water
Pumps












3,000,000


1000

Carrolton

TX

CDBG

Park
Place
Reconstruc3on












6,000,000


1000

Clarksville

TX

CDBG

Civic
center,
shelter,
upgrade
to
water
and
wastewater
facili3es,
and
upgrade
of
downtown
commercial
district

Clarksville

TX

Schools

Moderniza3on
of
the
High
school,
middle
school
and
elementary
schools










50,000,000


Clarksville

TX

Streets/Roads

Overlay
and
reconstruct
city
streets










10,000,000


Clarksville

TX

Water










35,000,000


College
Sta3on

TX

CDBG

Address
inflow
and
infiltra3on
concerns,
replace
all
an3quated
lines,source
protec3on
at
water
plant
and
lake,
 looping
system
in
south
part
of
town,
addi3onal
water
tower,
and
expansion
of
lake Holleman
U3lity‐Line
Burying












2,000,000


25

College
Sta3on

TX

CDBG

Northgate
Park












4,200,000


31.5

College
Sta3on

TX

CDBG

Affordable
Housing
Development












8,000,000


40

College
Sta3on

TX

CDBG

Holleman
Mixed‐Use
Development












4,000,000


50

College
Sta3on

TX

CDBG

Community
Center












7,000,000


120

College
Sta3on

TX

Streets/Roads

Tauber/Stasney
Roadway
Improvements












2,000,000


6

College
Sta3on

TX

Streets/Roads

Northgate
Pedestrian
Improvements












9,000,000


25

Dallas

TX

Airport

ARFF
Vehicle
Replacement












1,000,000


2

Dallas

TX

Airport

Design
for
taxiway
A
&
B
reconstruc3on

Dallas

TX

Airport

Dallas

TX

Dallas

TX

Dallas

TX

Dallas












4,000,000











12,000,000

















45,000


2

Airfield
Ligh3ng
Vault
Replacement:
Construc3on
of
north
&
west
vaults












2,400,000


24

Airport

Construc3on
of
Taxiway
L
extension
&
repair












4,400,000


44

Airport












5,500,000


55

Amtrak

Apron
&
Fuel
Hydrant
System
Replacement:
Design
of
concrete
apron
&
fuel
hydrant
system
for
new
terminal
 building
to
be
constructed
in
four
phases Drainage
reconstruc3on
&
sidewalk
construc3on
along
UP
Railroad
at
Beckley












1,100,000


11

TX

CDBG

IH‐20
Gateway
Park

Dallas

TX

CDBG

Bernal
Trail
Extension

Dallas

TX

CDBG

Marsalis
Avenue
sidewalk
replacement
and
pedestrian
improvements

Dallas

TX

CDBG

New
sidewalks,
curbs,
etc.

Dallas

TX

CDBG

Energy
efficency
&
conserva3on












3,640,000


36

Dallas

TX

CDBG

Con3nental
Avenue
modifica3on
to
pedestrian
bridge










10,000,000


100

Dallas

TX

CDBG

Trinity
Trails
Phases
2,3,4










16,000,000


160

Dallas

TX

CDBG

Construc3on
of
Conven3on
Center
Hotel








386,000,000


3800

Dallas

TX

Energy

Equipment,
supplies
and
tree
stock
for
Great
Trinity
Forest
tree
plan3ng
(includes
site
prepara3on)














500,000


5

Dallas

TX

Energy

Installa3on
of
Solar
Panels
on
city,
school
district
bldgs.,
on
streetlights,
traffic
signals














500,000


27.5

Dallas

TX

Energy

Installa3on
of
geothermal
heat
pumps
at
the
proposed
site
of
the
Texas
Horse
Park














150,000


30

Dallas

TX

Energy

Replacement
of
lamps
in
City‐owned
parking
lots
with
energy
efficient
LED
lights














700,000


37.5

Dallas

TX

Energy

Underhanging
of
138kV
Transmission
Lines
along
Irving
Boulevard












4,000,000


40

Dallas

TX

Energy

La3no
Cultural
Center
‐
Phase
II
design
and
construc3on










18,000,000


180

Dallas

TX

Energy














900,000


250

Dallas

TX

Energy

West
Dallas
Revitaliza3on
Project:
Work
with
low‐income
neighborhoods
to
weatherize
houses
and
retrofit
 them
with
energy
efficient
technology,
equipment,
systems
and
apppliances.
A
green
collar
jobs
element
will
 train
residents
to
retrofit
such
houses Library
Energy
Efficiency
Upgrades










42,000,000


420

Dallas

TX

Energy

Fire
Sta3on
#6
Energy
Efficiency
Replacements
&
Upgrades










52,000,000


520

Dallas

TX

Energy

Police
Academy
Construc3on










62,000,000


620

Dallas

TX

Housing

ADA
entrance
upgrades
at
all
sites














105,000


1

Dallas

TX

Housing

Exterior
repairs
at
at
Lifle
Mexico
Village














150,000


1

Dallas

TX

Housing

Clean
lagoon
at
Lakewest
Site














200,000


2

Dallas

TX

Housing

Replace
roofs
at
Brooks
Manor














250,000


3

Dallas

TX

Housing

Replace
roofs
at
Cliff
Manor














250,000


3














500,000


5












2,500,000


25














250,000


25












3,000,000


30

City

State

Program

Dallas

TX

Housing

Remodel
kitchens
at
scafered
sites

Project
Descrip3on

Funding
Required 












400,000


Jobs

Dallas

TX

Housing

Replace
elevators
at
Brooks
Manor














240,000


4

Dallas

TX

Housing

Exterior
repairs
at
Hidden
Ridge














500,000


5

Dallas

TX

Housing

Replace
roofs
at
Cedar
Springs














900,000


9

Dallas

TX

Housing

Concrete
work
at
all
sites












2,000,002


20

Dallas

TX

Housing

Demoli3on
of
Turner
Courts
&
Rhoads
Terrace












2,450,000


25

Dallas

TX

Housing

Construct
55
dwelling
units
at
Roseland
Homes












6,100,000


61

Dallas

TX

Public
Safety

Hire
20
new
police
officers












1,500,000


20

Dallas

TX

Public
Safety










40,000,000


30

Dallas

TX

Streets/Roads












1,240,000


10

Dallas

TX

Streets/Roads












2,257,920


18

Dallas

TX

Streets/Roads












2,257,920


18

Dallas

TX

Streets/Roads

Upgrade
the
City
of
Dallas
public
safety
radio
system
to
the
800
Mhz
digital
spectrum,
providing
City
of
Dallas
 first
responder
with
full
regional
interoperability Irving
Boulevard/Mockingbid
Lane
Inersec3on
Improvement
Project:
add
dual
leb‐turn
and
right‐turn
lanes
on
 all
approaches East
Dallas
Veloway
Phase
I:
build
a
2‐mile
mul3‐use
trail
that
will
create
a
19‐mile
con3nuous
trail
connec3ng
 East
Dallas
neighborhoods
with
two
DART
light
rail
sta3ons,
employment
centers,
schools,
retail
centers
and
 recrea3onal
facili3es Katy
Trail
Phase
IV:
build
a
2.5‐mile
mul3‐use
trail
from
Skillman
Street
to
the
Northwest
Highway
DART
Light
 Rail
Sta3on Industrial
Boulevard
reconstruc3on
from
Con3nental
Avenue
to
RR












5,200,000


52

Dallas

TX

Streets/Roads

Sign
replacement
program
‐
regulatory
and
warning.

100,000
signs
city‐wide.












8,250,000


83

Dallas

TX

Streets/Roads

Bafery
Back
up
for
traffic
signals
city‐wide












9,000,000


90

Dallas

TX

Streets/Roads

Chalk
Hill
Road
Reconstruc3on












9,100,000


90

Dallas

TX

Streets/Roads

Replace
structurally
deficient
traffic
signal
poles












8,800,000


90

Dallas

TX

Streets/Roads

Linfield
Road
Pedestrian
Bridge










10,000,000


100

Dallas

TX

Streets/Roads

Sylvan
Avenue
bridge
reconstruc3on










19,700,000


197

Dallas

TX

Streets/Roads

Pedestrian
Bridge
over
UP
Railroad
at
Cadiz
Street










20,000,000


200

Dallas

TX

Streets/Roads

Streetlights
on
freeways
without
exis3ng
ligh3ng










24,398,000


250

Dallas

TX

Streets/Roads

Upgrade
communica3on
system
for
centralized
traffic
control
system










33,000,000


330

Dallas

TX

Streets/Roads

Margaret
McDermof
(IH‐30)
Bridge
Reconstruc3on








246,540,000


2465

Dallas

TX

Water

Cullum
Street
(Waterview
to
Coit)














750,000


8

Dallas

TX

Water

48‐inch
DFW
line
tunneling












2,000,000


20

Dallas

TX

Water

54‐inch
wastewater
interceptor
Turtle
Creek
from
Maple
to
Cedar
Springs












2,200,000


22

Dallas

TX

Water

Southside
Plant
‐
DLD
Field
Regrading












3,000,000


30

Dallas

TX

Water

Water
&
wastewater
main
replacement
construc3on
(HZ)(LB)
‐
25,000
lf
of
pipeline
replacements












4,800,000


32

Dallas

TX

Water

McKamy,
Cofonwood
&
central
Branch
Phase
I












6,000,000


60

Dallas

TX

Water

Water
&
wastewater
main
replacement
(Phase
II)
(Dal‐Tec)
(EV)
‐
30,000
lf
of
pipeline
replacement












6,000,000


60

Dallas

TX

Water

Appian
&
Central
Low
Construc3on
Phase
I
(AP)












6,500,000


65

Dallas

TX

Water

Ferris
Branch
Replacement
Construc3on
Phase
II
‐
24,000
lf
of
pipeline
replacement












6,700,000


67

Dallas

TX

Water

SW
Pipeline
(Wintergreen
Raod
from
I‐35
to
Houston
School
Road)










18,000,000


180

Dallas

TX

Water

Water
&
wastewater
Replacement
(In‐house)










20,000,000


200

Dallas

TX

Water

Tawakoni
Balancing
Reservoir
Expansion










30,000,000


300

Dallas

TX

Water

Lake
Tawakoni
144‐inch
raw
water
pipeline
Phase
I










45,000,000


450

Del
Rio

TX

Airport

Airport
Design














500,000


3

Del
Rio

TX

Airport

Hanger
Project














500,000


10

Del
Rio

TX

Airport

Airport
Terminal
Expansion












2,000,000


15

Del
Rio

TX

Amtrak

Rail
Spur












8,000,000


10

Del
Rio

TX

Amtrak

Sta3on
Upgrade












2,000,000


10

Del
Rio

TX

CDBG

Wastewater
Ouzall
Line












1,000,000


8

Del
Rio

TX

CDBG

Recycle
Drop
Off
Sta3on












3,500,000


10

Del
Rio

TX

CDBG

Animal
Control
Building












1,500,000


12

Del
Rio

TX

CDBG

Ave
E
&
G
Infrastructure












2,000,000


12

Del
Rio

TX

CDBG

City
Paving
Plan
Upgrades/Repair












2,000,000


12

Del
Rio

TX

CDBG

Main
Street
Infrastructure












2,000,000


12

Del
Rio

TX

CDBG

Sports
Complex












3,000,000


18

Del
Rio

TX

CDBG

City
Building
Repairs












4,000,000


20

Del
Rio

TX

CDBG

Dodson
Paving
Project












1,000,000


20

Del
Rio

TX

CDBG

Fire
Department
Admin
Building












1,000,000


20

Del
Rio

TX

CDBG

Interna3onal
Bridge
Toll
Plaza












3,000,000


20

Del
Rio

TX

CDBG

City
Hall
Design/Build












8,000,000


30

Del
Rio

TX

CDBG

Qualia
Loop
Relief
Route












5,000,000


30

Del
Rio

TX

Energy

Energy
Distribu3on
Center












2,000,000


20

Del
Rio

TX

Energy

City
Green
Project












5,000,000


30

Del
Rio

TX

Housing

Public
Housing
Addi3on












2,000,000


Del
Rio

TX

Housing

Upgrade
Public
Housing












5,000,000


Del
Rio

TX

Public
Safety

Police
Equipment
Upgrade












1,000,000


10

Del
Rio

TX

Public
Safety

Technology
Upgrade












1,000,000


10

Del
Rio

TX

Schools

Sports
Complex












2,000,000


20

Del
Rio

TX

Schools

High
School
Green
Design












4,000,000


25

Del
Rio

TX

Schools

SFCISD
Technology
Program












5,000,000


30

Del
Rio

TX

Streets/Roads

Frontera
Road
Infrastructure
Project














250,000


2.5

Del
Rio

TX

Streets/Roads

Qualia
Loop
Relief
Route












2,000,000


20

Del
Rio

TX

Transit

Fixed
Bus
Route
Transit














800,000


15

4

City

State

Program

Del
Rio

TX

Water

Water
Conserva3on
Plan

Project
Descrip3on

Del
Rio

TX

Water

Water
Leak
Study
Water
Model
Study

Del
Rio

TX

Water

Del
Rio

TX

Del
Rio

Funding
Required 












500,000


Jobs 2














200,000


2

Water
Treatment
Plant/Vibra3ng
Racks












1,000,000


3

Water

Wastewater
Facility
Plan












1,000,000


4

TX

Water

Wastewater
Collec3on
Line

Del
Rio

TX

Water

Del
Rio

TX

El
Paso

TX

El
Paso














600,000


5

Lib
Sta3on
Upgrades












4,000,000


10

Water

Water
System
Improvement












1,000,000


10

CDBG

Father
Mar3nez
Senior
Center
Improvements
‐
improvements
to
senior
center














624,500


14

TX

CDBG

Bucher
Road
Street
and
Drainage
Improvements
‐
street
and
drainage
improvements














709,600


16

El
Paso

TX

CDBG

Coronado
Road
Phase
2
Street
&
Drainage
improvements
‐
street
and
drainage
improvements














937,128


21

El
Paso

TX

CDBG

Borderland
Area
Phase
7
Street
&
Drainage
Improvements
‐
street
and
drainage
improvements












1,199,106


27

El
Paso

TX

CDBG












1,250,000


28

El
Paso

TX

CDBG












5,500,000


122

El
Paso

TX

Energy

Chamizal
Wellnes
and
Neighborhood
Center
‐
renova3on
of
former
neighborhood
facility
to
City‐operated
 center Central
Recrea3on
Center
Remodeling
‐
retrofic
and
renova3on
of
former
YMCA
facility
as
City
operated
 recrea3on
center Street
Light
Conversion
‐
replacement
of
exis3ng
street
lights
with
energy
efficient,
dark‐sky
compliant
fixtures












5,000,000


111

El
Paso

TX

Energy

Landfill
Gas
to
Energy
‐
installa3on
of
energy
and
capture
systems
at
City‐owned
landfill












6,250,000


138

El
Paso

TX

Energy










30,000,000


664

El
Paso

TX

Streets/Roads

Facility
Energy
Efficiency
Retrofits
‐
retrofit
of
ligh3ng
and
HVAC
systems
to
energy
efficient
systems
at
exis3ng
 City
facili3es Street
Name
Sign
Replacement
city‐wide














600,000


13

El
Paso

TX

Streets/Roads

Thermal
Plas3c
Lane
Marking
Installa3on
‐
City‐wide












1,500,000


33

El
Paso

TX

Streets/Roads

Concrete
Sidewalk
Installa3ons
City‐wide













2,500,000


55

El
Paso

TX

Streets/Roads

Microsurfacing
city‐wide












3,000,000


66

El
Paso

TX

Streets/Roads

New
Signal
Installa3on
‐
installa3on
of
traffic
signals
citywide
at
warranted
intersec3ons












3,000,000


66

El
Paso

TX

Streets/Roads

Regulatory
&
Advisory
Sign
Replacement












3,000,000


66

El
Paso

TX

Streets/Roads

Paving
Unpaved
ROW's
‐
Paving
of
Alleys
and
other
ROW's
city‐wide












5,000,000


111

El
Paso

TX

Streets/Roads

Stanton
Street
Toll
Facility
Improvements
‐
improvements
to
interna3onal
bridge
to
facilitate
pedestrian
access












7,000,000


155

El
Paso

TX

Streets/Roads

Paso
del
Norte
Toll
Facility
Improvements
‐
improvements
to
interna3onal
bridge
to
facilitate
pedestrian
access










10,400,000


230

El
Paso

TX

Streets/Roads

Carolina
Bridge
Reconstruc3on
‐
reconstruc3on
and
widening
of
deficient
railroad
overpass










11,367,320


251

El
Paso

TX

Streets/Roads

Pasodale
street
reconstruc3on
‐
reconstruc3on
of
streets
and
drainage
improvements
at
Pasodale
subdivision










17,000,000


376

El
Paso

TX

Streets/Roads










20,000,000


442

El
Paso

TX

Streets/Roads

Resurfacing
‐
resurfacing
of
city
streets
city‐wide;
includes
modifica3ons
for
ADA
accessibility
at
intersec3ons
 and
bus
routes Yarbrough
Bridge
Reconstruc3on
‐
reconstruc3on
of
deficient
railroad
overpass










22,400,000


495

El
Paso

TX

Transit

Mission
Valley
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
park‐n‐ride
facili3es














604,000


13

El
Paso

TX

Transit

Westside
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
park‐n‐ride
facili3es












1,400,000


31

El
Paso

TX

Transit












1,851,000


41

El
Paso

TX

Transit

Oregon
Street
Realignment/SMART
101
BRT
Route
‐‐
Street
and
parkway
improvements
for
starter
BRT
Route
 from
downtown
to
University
of
Texas
at
El
Paso Downtown
Transit
Terminal
‐
Construc3on
of
new
transit
terminal

El
Paso

TX

Transit

Northgate
Transit
Terminal
‐‐
property
acquisi3on
and
construc3on
of
new
transit
terminal

El
Paso El
Paso

TX TX

Transit Transit

El
Paso

TX

Transit

Euless

TX

CDBG

Glory
Road
Transit
Terminal
‐‐
Construc3on
of
new
transit
terminal
including
parking
garage Gas
Liquefac3on
Facility
‐
Construc3on
of
new
gas
liquefac3on
facility
to
migrate
mass
transit
fleet
to
 alterna3ve
fuel Maintenance,
Administra3on
&
Opera3ons
Facility
‐‐
construc3on
of
new
facility
to
house
mass
transit
 department's
opera3ons Walking/Biking
Trails

Euless

TX

CDBG

Euless

TX

Euless












2,696,010


60












5,782,000
 










9,185,000


128 203










11,248,600


249










20,000,000


442














350,000


10

Animal
Shelter












2,500,000


15

CDBG

Parks
At
Texas
Star
‐
Phase
IV












2,000,000


15

TX

CDBG

Euless
Housing
Revi3liza3on












2,500,000


20

Euless

TX

CDBG

Sobball
World
Park
Improvements














785,000


25

Euless

TX

CDBG

Police
and
Fire
Training
Center












3,500,000


35

Euless

TX

CDBG

Midway
Park
Family
Life
Center
(Includes:

Senior
Center/Aqua3c
Facility)










15,000,000


125

Euless

TX

Public
Safety

Replace
the
video
system
in
all
patrol
cars
with
digital
system














220,000


3

Euless

TX

Public
Safety

Euless

TX

Public
Safety

Addi3onal
Police
Officers:
(3)
to
staff
addi3onal
district;
(7)
to
expand
the
SRO
Program
to
the
Elementary
 Schools Rebuild
the
radio
system
infrastructure
for
Euless
and
5
other
municipali3es

Euless

TX

Streets/Roads

Euless

TX

Euless














772,300


10










21,000,000


50

City‐Wide
Traffic
Signal
Projects














750,000


16

Streets/Roads

City‐Wide
Sidewalk
Projects














625,000


17

TX

Streets/Roads

City‐Wide
Street
Overlays












2,500,000


23

Euless

TX

Streets/Roads

Paving
Project:

Cullum/Alexander












1,650,000


55

Euless

TX

Streets/Roads

Paving
Project:

Ross
Avenue














785,000


55

Euless

TX

Streets/Roads

Paving
Project:

Vine
Street














775,000


55

Euless

TX

Streets/Roads

Paving
Project:

Ash
Lane












2,650,000


60

Euless

TX

Streets/Roads

Paving
Project:

Baze
Road












2,575,000


60

Euless

TX

Streets/Roads

State
Highway
121
at
Glade
Road
Braided
Ramp












5,500,000


70

Euless

TX

Water

Recycled
Effluent
Water
Line












2,500,000


15

Euless

TX

Water

Water
Main
Project:
Collin/Dallas/Denton/Harwood














715,000


15

Euless

TX

Water

Water
Main
Project:
Live
Oak/Marlene














650,000


15

Euless

TX

Water

Wastewater
Project:

Pauline/Norman/Franklin














875,000


19

Euless

TX

Water

Wastewater
Project:

Ross/Whitener/Alexander
O.F.














880,000


19

Euless

TX

Water

Wastewater
Project:

W.
Mills/Arnef/W.
Alexander














975,000


19

City

State

Program

Euless

TX

Water

Wastewater
Project:
Crane/Blanco/Collin/Aransas

Project
Descrip3on

Funding
Required 












955,000


Jobs 19

Euless

TX

Water

Wastewater
Project:
Oakwood
Terrace/Slaughter/Huif

Euless

TX

Water

Water
Main
Project:
Fuller/Springwood/Kynefe












1,100,000


19














910,000


Euless

TX

Water

Water
Main
Project:
S.
Pipeline/Westwood

20














906,000


Euless

TX

Water

Water
Main
Project:
Stony
Creek/Eastcliff/Lifle
Creek

20












1,050,000


Euless

TX

Water

20

Culvert
Replacement:

Kynefe
Drive














725,000


Euless

TX

40

Water

Culvert
Replacement:

Marlene
Drive














725,000


Euless

40

TX

Water

Culvert
Replacement:

Simmons
Drive














850,000


40

Euless

TX

Water

Drainage
Project:

Hurricane
Creek












4,333,000


77

Euless

TX

Water

Drainage
Project:

Boyd
Branch












8,600,000


90

Euless

TX

Water

Lifle
Bear
Creek
Drainage
Improvements










11,150,000


100

Flower
Mound

TX

CDBG

First‐3me
fire
protec3on
water,
sewer,
and
streets
paved
to
city
standards
in
a
low‐income
neighborhood












1,436,177


29

Flower
Mound

TX

Energy

Replace
pneuma3c
control
system
&
upgrade
building
management
system














100,000


2

Fort
Worth

TX

Airport

Spinks
Airport
&
Fire
Sta3on
#42
Improvements 










9,000,000


113

Fort
Worth

TX

CDBG

Cobb
Park
Masterplan
Improvements












9,520,000


119

Fort
Worth

TX

CDBG










11,000,000


138

Fort
Worth

TX

CDBG










16,770,000


210

Fort
Worth

TX

CDBG

New
Fire
Sta3ons: Sta3on
#5;
Sta3on
#27;
and
Sta3on
#34 Zoo
Infrastructure
Renova3ons: Facili3es
and
Walkway
Renova3ons
($2.37M);
Parking
Garage
($14.4). Western
Heritage
Parking
Facility










25,000,000


313

Fort
Worth

TX

CDBG








106,000,000


1325

Fort
Worth

TX

CDBG








383,500,000


4794

Fort
Worth

TX

Streets/Roads

Regional
Swimming
Centers: SE/SW
Natatorium
/
Community
Centers
($70.0M);
Medium
Aqua3c
Centers
($32.0M);
and
Spraygrounds
 ($4.0).
 Trinity
River
Vision
Flood
Control
&
Related
Projects: U3lity
Reloca3ons
($60.0M);
Police
&
Fire
Training
Center
Reloca3on
Phase
1&2
($111.50);
Bypass
Channel
 Arterial
Bridges
($90.0M);
Riverside
WWTP
Environmental
Remedia3on
&
Park
Restora3on
( Schools
To
Neighborhoods
Pedestrian
/
Bicycle
Connec3ons

Fort
Worth

TX

Streets/Roads

Fort
Worth

TX

Streets/Roads

Fort
Worth

TX

Streets/Roads

Fort
Worth

TX

Fort
Worth












5,000,000


63

Urban
Village
Transpora3on
Connec3ons










10,000,000


125










75,500,000


944










83,700,000


1046

Streets/Roads

Arterial
Streets: North
Beach
Street
($6.0M);
W.
Rosedale
Retrofit
($4.0M);
Silver
Creek
($2.0M);
Precinct
Line
($10.0M);
 Summer
Creek
($3.0M);
Berry
Street
/
287
($1.5M);
Harley
Street
Drainage
&
Realignment
($45.0M);
and
Keller
 Hicks
($4.0). Southwest
Parkway
&
Related
Improvements: Dirks
Road
($16.0M);
U3lity
Reloca3ons
($17.7M);
UPRR
Easments
&
Reloca3ons
($50.0M). IH‐35
/
IH‐820
Interchange








200,000,000


2500

TX

Transit

9th
Street
Walkable
Transit
Connec3ons












1,500,000


19

Fort
Worth

TX

Transit








471,000,000


5888

Fort
Worth

TX

Water

Fort
Worth
T
Rail
Improvements: NE@SW
Rail Botanic
Gardens
/
Botanical
Research
Ins3tute
Demonstra3on
Storm
Water
Management
Parking
Area












6,000,000


74

Fort
Worth

TX

Water










55,500,000


694

Fort
Worth

TX

Water

Eastside
Water
Reuse
Project‐
reclama3on
water
for
irriga3on
and
other
water
uses
replacing
potable
water
 usage Construct
New
Westside
Water
Treatment
Plant










61,000,000


763

Fort
Worth

TX

Water








177,300,000


2216

Frisco

TX

Energy

Sanitary
Sewer
Overflow,
Street
Rehabilita3on,
Ligh3ng
and
Signals: SSO
Pipeline
Rehabilita3on
($123.0M);
Peak
Flow
Storage
Facility
($22.0M);
Street
Rebilita3ons
($17.0M);
and
 Street
Ligh3ng/Signaliza3on
($15.3M).
 Realigning
Building
Ligh3ng
to
Reduce
Aber
Hours
Usage

Frisco

TX

Energy

Solar
Panels
to
Provide
Energy
to
City
Hall
Building












2,000,000


Frisco

TX

Housing

Ongoing
Public
Housing
Maintanence
and
Repair
Program
















50,000


Frisco

TX

Public
Safety

Armored
Vehicle














125,000


Frisco

TX

Public
Safety

Electronic
Surveillance
Equipment
















55,000


Frisco

TX

Public
Safety

Fingerprint
Analysis
Sobware
















55,000


Frisco

TX

Public
Safety

Increase
Firearms
Training
















30,000


Frisco

TX

Public
Safety

Mobile
Command
Post

Frisco

TX

Public
Safety

Police
&
Fire
Emergency
Communica3ons
System

Frisco

TX

Public
Safety

Detec3ve
for
Juvenile
Inves3ga3ons
Unit














150,000


2

Frisco

TX

Public
Safety

Expand
Vic3m
Assistance
Program














165,000


2.25

Frisco

TX

Public
Safety

Expand
the
School
Resource
Officer
Program
at
the
High
School
Level














375,000


5

Frisco

TX

Public
Safety

Enhance
Patrol
Coverage














900,000


12

Frisco

TX

Streets/Roads

Eldorado
Parkway
‐
widen
2
lane
rural
road










10,000,000


Frisco

TX

Streets/Roads

FM
3537
(SH
289
to
FM
2478)










30,830,000


Frisco

TX

Streets/Roads

FM
423
(Middle
Sec3on
‐
Stewart
Creek
to
Eldorado)










45,000,000


Frisco

TX

Streets/Roads

FM
423
(North
Sec3on
‐
Eldorado
to
US
380)










50,000,000


Frisco

TX

Streets/Roads

Lebanon
&
Dallas
North
Tollway
‐
intersec3on
improvement












2,000,000


Frisco

TX

Streets/Roads

Road
Expansion
‐‐
Teel
Parkway
from
Eldorado
to
Freestone

Frisco

TX

Streets/Roads

Rolater
Road
(Custer
‐
Independence)












3,000,000


Frisco

TX

Streets/Roads

Stonebrook
(FM
423
‐
Teel)












8,500,000


Frisco

TX

Streets/Roads

Stonebrook
(Legacy
‐
Longhorn)










15,000,000


Frisco

TX

Streets/Roads

Traffic
Signal
System
EOC
Expansion

Frisco

TX

Streets/Roads

Virginia
Parkway
(
Preston
‐
DNT)










14,000,000


Frisco

TX

Streets/Roads

Virginia
Parkway
(DNT
‐
CR
26)












6,000,000


Frisco

TX

Transit

Quiet
Zone
Improvements
‐
Crossing
Upgrades












1,485,000















100,000















200,000
 










8,000,000















500,000















250,000


City

State

Program

Frisco

TX

Water

12"
&
24"
Dallas
North
Tollway
Water
Lines

Project
Descrip3on

Funding
Required 










3,000,000


Jobs

Frisco

TX

Water

30"
Dallas
North
Parkway
Water
Line

Frisco

TX

Water

Cofonwood
Branch
Cameron
Way
&
Camfield
Way
flood
control

Frisco

TX

Water

Cofonwood
Creek
Lib
Sta3on

Frisco

TX

Water

Creek
on
the
Westside
of
Sunset
Drive
‐
flood
control

Frisco

TX

Water

Eldorado
Pump
Sta3on
Remedia3on

Frisco

TX

Water

Hillcrest
Road
&
Preston
Vineyard
Drive
Channel
Improvements

Frisco

TX

Water

Installa3on
of
delivery
system
for
currently
permifed
re‐use
water












5,200,000


Frisco

TX

Water

Main
Street
Pilot
Channel












1,000,000


Frisco

TX

Water

Northwest
Infrastructure
‐
12",
16",
20"
Virginia/Teel
Water
Lines












4,000,000


Frisco

TX

Water

Northwest
Infrastructure
‐
Sanitary
Sewer
Improvements












2,000,000


Frisco

TX

Water

Panther
Creek
Sewer
‐
Phase
2
(Parvin
Branch)












3,500,000


Frisco

TX

Water

Panther
Creek
WWTP
Expansion










20,000,000


Frisco

TX

Water

Preston
"24
Water
Line












2,000,000


Frisco

TX

Water

Repair
of
Eldorado
Earthern
Dam












1,000,000


Frisco

TX

Water

Stewart
Creek
Pilot
Channel












2,000,000


Garland

TX

Streets/Roads

Sidewalk
installa3on,
Beltline
Rd
from
Jupiter
Rd
to
Buckingham
(19,447
l.f.)












1,458,525


Garland

TX

Streets/Roads

Sidewalk
installa3on,
Rowlef
Rd
from
east
city
limits
to
Broadway
(15,392
l.f.)













1,154,400


Garland

TX

Streets/Roads

Sidewalk
installa3on,
Shiloh
Rd
from
Buckingham
to
Kingsley
(22,183
l.f.)












1,663,725


Garland

TX

Streets/Roads

Street
reconstruc3on:
Briarwood,
5th
to
Glenbrook












1,000,000


Garland

TX

Streets/Roads

Street
reconstruc3on:
Bullock
from
Edgewood
to
Walnut

Garland

TX

Streets/Roads

Street
reconstruc3on:
Industrial
Dr
from
Kingsley
to
Wood












1,050,000


Garland

TX

Streets/Roads

Street
reconstruc3on:
Merrimac
Tr
from
Broadway
to
Colonel












1,000,000


Garland

TX

Streets/Roads

Street
reconstruc3on:
Oakland
Ave
from
Shiloh
to
Warehouse














480,000


Garland

TX

Streets/Roads

Street
reconstruc3on:
Shepherd
Dr
from
Ac3on
to
Forest
Lane

Garland

TX

Streets/Roads

Street
repair:
Centerville
Rd
from
Firewheel
Pkwy
to
IH
635












1,000,000


Garland

TX

Streets/Roads

Street
repair:
Forest
Ln
from
Garland
Ave
to
west
city
limits














500,000


Garland

TX

Streets/Roads

Street
repair:
Shiloh
Rd
from
Kingsley
to
SH
190














250,000


Garland

TX

Water

1,000
lineal
feet
of
replacement
water
lines
(Jupiter
Road)

Garland

TX

Water

10,500
feet
of
water
and
wastewater
replacement
(LBJ
Freeway)

Garland

TX

Water

4,300
lineal
feet
of
relief
sewer
(Jupiter/Shiloh)














800,000


Garland

TX

Water

4,700
feet
of
relief
sanitary
sewer
(Hubbard
Hills)














800,000


Garland

TX

Water

Construc3on
of
1,700
feet
of
new
21"
sanitary
sewer
(Firewheel)














400,000


Garland

TX

Water

Drainage
Improvements
(Cur3s
Drive)














600,000


Garland

TX

Water

Drainage
improvements
(Vanderbilt
Drive)














350,000


Garland

TX

Water

Erosion
control
project
(Allegheney
Trail)

Garland

TX

Water

Install
11,500
lineal
feet
of
30"
wastewater
relief
sewer
(ROWL
‐1)












4,500,000


Garland

TX

Water

Install
7,500
lineal
feet
of
relief
anitary
sewer
(Carroll/Bardfield)












1,900,000


Garland

TX

Water

Storm
Sewer
installa3on
(Club
Meadow)














500,000


Garland

TX

Water

Storm
sewer
sysytem
to
prevent
flooding
(Mint
Drive)














400,000


Grand
Prairie

TX

CDBG

Acquisi3on
of
land
for
parking
for
Main
street
businesses
and
artwork
display
for
the
Uptown
district














500,000


10

Grand
Prairie

TX

CDBG

Expand
sidewalks
and
provide
ADA
compliance
to
promote
pedestrian
traffic
for
Main
Street
Businesses














400,000


10

Grand
Prairie

TX

CDBG

Provide
direc3onal
signage
for
the
Uptown
District
and
for
the
en3re
city














500,000


12

Grand
Prairie

TX

CDBG














600,000


12

Grand
Prairie

TX

CDBG

Public
space
improvements
&
maintenance;
add
more
ligh3ng,
complete
sidewalk
repair,
install
landscaping,
 irriga3on,
tree
wells,
park
benches,
receptacles Landscape
wall
&
provide
irriga3on
that
will
buffer
Main
Street
businesses
from
the
railroad
tracks














500,000


15

Grand
Prairie

TX

CDBG

Parking
for
Uptown
Theater















850,000


15

Grand
Prairie

TX

CDBG

Removal
of
pole
signs
in
Uptown
district.














500,000


20

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Replacement
and/or
addi3on
of
canopies
or
awnings
that
will
shade
and
promote
pedestrian
traffic
in
the
 Main
Street
Revitaliza3on
efforts Abatement
of
lead
paint
from
buildings
on
Main
street
in
the
uptown
District

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Provide
addi3onal
parks
infrastructure
to
exis3ng
parks;
such
as
disc
golf,
addi3onal
picnic
tables,
playground
 equipment,
and
other
outdoor
recrea3onal
facili3es Provide
infrastructure
improvements
for
a
metropolitan
park
that
needs
addi3onal
park
roads,
picnic
tables,
 boat
ramps,
camping
facili3es,
cabins
and
fishing
piers
which
will
provide
city
dwellers
closer
access
to
these
 types
of
facili3es. Construct
an
arboretum
on
historical
city
property.

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

Grand
Prairie












2,250,000
 












250,000
 










3,600,000
 












250,000
 








10,000,000
 












500,000















450,000















780,000















400,000
 










1,800,000















100,000















600,000


20












1,000,000


25










10,000,000


25












1,000,000


25












1,850,000


40












2,500,000


40












5,000,000


45

Abatement
of
Asbestos
from
buildings
on
Main
Street
in
the
Uptown
district












2,000,000


50












5,500,000


50

CDBG

Build
city
wide
trail
link
system
to
move
175,000
ci3zens
to
major
event
centers
such
as
lakes,
parks,
librairies,
 downtown
and
schools. Construct
a
Public
gathering
and
fes3val
loca3on
on
Main
street












1,500,000


50

TX

CDBG

Convert
a
vacant
school
into
a
municipal
building












1,500,000


50

Grand
Prairie

TX

CDBG












2,950,000


50

Grand
Prairie

TX

CDBG

Provide
6
buses
to
transport
ci3zens
to
major
recrea3on
facili3es
in
27
mile
long
community
serving
175,000
 ci3zens.

There
is
no
current
public
transporta3on. Provide
a
new
aqua3c
facility
for
the
Dalworth
community
center.












7,500,000


50

Grand
Prairie

TX

CDBG












2,500,000


50

Grand
Prairie

TX

CDBG

Provide
an
addi3on
to
the
Dalworth
neighborhood
community
center.
The
facility
was
built
in
the
1950's
and
is
 in
dire
need
of
expansion
and
renova3on.
 Purchase
and
convert
empty
downtown
buildings
space
for
ar3st
sans
while
crea3ng
green
space
areas.












5,000,000


50

Relocate
Fire
Sta3on
7
to
provide
for
quicker
response
3mes
for
those
ci3zens
and
businesses
located
south
of
 Camp
Wisdom. Street
Light
Replacement
for
the
Uptown
district

City

State

Program

Grand
Prairie

TX

CDBG

Grand
Prairie

TX

Grand
Prairie

Project
Descrip3on

Funding
Required

Jobs

CDBG

Provide
job
retraining
for
displaced
workers
in
community
facili3es.

Such
topics
for
retraining
could
include
 the
following:
Hor3culture,
conference
center
opera3ons,
retail,
landscape
maintenance,
youth
center
 leadership,
coaching,
food
and
beverage
 Reloca3on
of
overhead
u3li3es
to
be
placed
underground
for
the
Uptown
District












4,000,000


75

TX

CDBG

Weatherizing
&
provide
energy
efficient
windows,
roofs
and
enclosures
for
the
Uptown
District












2,000,000


100

Grand
Prairie

TX

CDBG












1,500,000


150

Grand
Prairie

TX

Energy

Rebuild
2700
feet
of
dilapadated
Main
Street
facades
and
signage
to
jumpstart
the
ongoing
revitaliza3on
of
the
 downtown
area.
The
City
of
Grand
Prairie
currently
is
inves3ng
funds
to
rejuvenate
this
area
to
afract
new
 merchants
and
jobs. Provide
a
Energy
Efficient
Building
System
for
City
Buildings
which
are
currently
not
on
this
system.












2,000,000


25

Grand
Prairie

TX

Energy

Relocate
overhead
power
transmission
lines
at
Public
Safety
building
and
Adult
Ac3vity
Center












6,000,000


25

Grand
Prairie

TX

Public
Safety

Installa3on
of
new
gaslines
for
the
new
Public
Safety
building.














350,000


12

Grand
Prairie

TX

Public
Safety

Installa3on
of
landscaping
and
trail
system
surrounding
the
new
Public
Safety
Building












1,250,000


20

Grand
Prairie

TX

Streets/Roads

Extend
January
Lane
from
Dallas
Street
to
State
highway
161.

This
will
be

a
4
lane
road.












3,100,000


40

Grand
Prairie

TX

Streets/Roads

Reconstruc3on
of
Camp
Wisdom
Road
Paving
from
Robinson
to
Carrier
Parkway
from
two
lane
to
Four
lanes.













3,100,000


45

Grand
Prairie

TX

Streets/Roads












3,100,000


45

Grand
Prairie

TX

Streets/Roads

Reconstruc3on
of
Freetown
Road
from
Corn
Valley
to
Carrier
Parkway.

This
would
change
it
from
a
two
lane
 asphalt
road
to
a
three
lane
concrete
paved
road. Construct
a
5
lane
roadway
that
intersects
Interstate
Highway
30
at
Bagdad
and
Gifford.












4,000,000


50

Grand
Prairie

TX

Streets/Roads

Repair
embankment
on
Lakeridge
Parkway
at
Joe
Pool
Lake.












3,600,000


50

Grand
Prairie

TX

Streets/Roads

Construct
a
new
4
lane
road
between
State
Highway
360
and
Lakeridge
Parkway.












7,100,000


90

Grand
Prairie

TX

Streets/Roads

Widened
Lakeridge
Parkway
from
4
lanes
to
6
lanes
between
Joe
Pool
Lake
and
Great
Southwest
Parkway












7,930,000


90

Grand
Prairie

TX

Water












1,292,000


20

Grand
Prairie

TX

Water












9,709,546


850

Houston

TX

Streets/Roads










15,000,000


50

Houston

TX

Streets/Roads












8,300,000


230

Houston

TX

Streets/Roads










13,000,000


360

Houston

TX

Streets/Roads










13,136,000


365

Houston

TX

Streets/Roads










13,300,000


370

Houston

TX

Streets/Roads










14,000,000


385

Houston

TX

Streets/Roads










19,260,000


535

Houston

TX

Streets/Roads










21,700,000


600

Houston

TX

Streets/Roads








175,000,000


4870

Houston

TX

Water

Houston Houston Houston

TX TX TX

Water Water Water












5,000,000
 








15,000,000
 








35,000,000


15 50 100










19,000,000


150

Houston

TX

Water

Hurst Hurst Hurst

TX TX TX

CDBG CDBG CDBG

Provide
Strom
Drain
and
Wastewater
main
improvements
along
Nadine
Lane
from
Mafhew
Road
to
Prairie
 Lane. Install
South
Sector
of
Grand
Prairie
Wastewater
System.

This
wastewater
system
will
allow
the
development
 of
over
5000
acres
in
the
City
South
of
Joe
Pool
Lake.

Over
9100
homes
are
planned
for
this
area. West
Houston
Intelligent
Transporta3on
Systems
‐ Deployment
of
Intelligent
Transporta3on
Systems
technologies,
including
Advanced
Traffic
Management
 System,
Advanced
Travel
Informa3on
System,
and
Traffic
Incident
Management
in
West
Houston
in
area
bou Parker
Road
Paving
–
Thoroughfare
widening
between
Hardy
Toll
Road
and
Eastex
Freeway
(US
59)
in
 Northeast
Houston. Sims
Bayou
Hike
&
Bike
Trail
‐
Trail
between
IH
45
and
SH
288
for
access
to
schools
and
parks
near
Hobby
 Airport
in
Southwest
Houston. Tanner
Road
Paving
–
Thoroughfare
widening
between
Hempstead
and
Beltway
8
near
US
290
corridor
in
 Northwest
Houston. Homestead
Road
Grade
Separa3on –
Grade
separa3on
for
Thoroughfare
over
Beaumont
Subdivision
track
of
Union
Pacific
Railroad
Company
in
 Northeast
Houston. Clinton
Drive
Reconstruc3on
–
Street
reconstruc3on
between

Wayside
to
eastern
City
Limits
near
Port
of
 Houston
in
Southeast
Houston. Greens
Road
Paving
‐
Thoroughfare
widening
between
Aldine‐Weszield
and
Lee
near
Bush
Intercon3nental
 Airport
in
Northeast
Houston. Buffalo
Speedway
Paving
and
Reconstruc3on
‐
Thoroughfare
extension
between
Holmes
and
Airport
and
street
 reconstruc3on
between
Holcome
and
South
Braeswood
for
access
to
Texas
Medical
Center,
Greenway
Plaza,
 and
Reliant
Park
in
Southwest
Houston. Metro
Houston
Intermodal
Terminal
Streets
‐Street
infrastructure
improvements
and
street
access
on
Fulton,
 Bayou
and
Burnef
for
new
Metro
Houston
Intermodal
Terminal
near
Downtown. Almeda
Sanitary
Sewer
Tunnel
Rehabilita3on
‐
Rehabilita3on
of
84"
sanitary
sewer
by
chemical
grou3ng
and
 sliplining
in
Southwest
Houston. City‐Wide
Wastewater
Collec3on
System
Rehabilita3on
and
Renewal City‐Wide
Sanitary
Sewer
Rehabilita3on
‐

Rehabilita3on
of
6"
‐
18"
sanitary
sewers
by
sliplining
or
pipe
 Drinking
Water
Quality
Laboratory
at
East
Water
Purifica3on
Plant –
Construc3on
of
new
drinking
water
quality
laboratory
at
East
Water
Purifica3on
Plant. City‐Wide
Flood
Control
Program
‐
Various
flood
control
projects
throughout
City
to
manage
stormwater
 drainage,
pumping
and
deten3on
to
prevent
flooding. Repair
and
improvement
of
homes
in
CDBG
area,
including
updated
energy
improvements Reconstruc3on
of
Redbud
Drive
with
replacement
of
old
water
and
sewer
lines,
sidewalks
 Reconstruc3on
of
Bellaire
Drive
with
replacement
of
old
water
and
sewer
lines
and
sidewalks








221,000,000
 












125,000
 












380,000


4420 2 4












1,600,000


16

Hurst

TX

Energy

Conversion
of
incandesant
bulbed
traffic
signals
to
LED
lights
for
power
savings 












175,000


2

Hurst

TX

Energy

Addi3on
of
alterna3ve
energy
to
power
low
wafage
devices
at
pump
sta3ons














260,000


3

Hurst

TX

Energy

Conversion
of
school
zone
warning
signs
to
solar
opera3on














110,000


4

Hurst

TX

Energy

Municipal
Complex/Service
Center
Energy
Efficiency
Improvements














400,000


4

Hurst

TX

Housing

Recrea3on
Center
renova3ons‐‐interior
remodel
work














300,000


10

Hurst

TX

Housing

Aqua3cs
Centers
renova3ons














700,000


25

Hurst

TX

Housing

Mayfair
Park
development‐‐add
playground,
trails,
pavillion,
picnic
tables,
landscaping












1,200,000


25

Hurst

TX

Housing

Library
Renova3on
with
the
addi3on
of
a
large
program
room
and
interior
renova3ons












3,600,000


100

Hurst

TX

Housing

Construc3on
of
a
Senior
Ci3zen
Center












5,531,510


200

Hurst

TX

Public
Safety

Emergency
Warning
System














200,000


2

Hurst

TX

Public
Safety

Radio
system
to
allow
inter‐operability
with
surrounding
ci3es












1,900,000


8

Hurst

TX

Public
Safety

Renova3ons
of
Fire
Sta3on
#2
to
enhance
fire
protec3on
and
modernize
the
building

Hurst

TX

Public
Safety

Hurst

TX

Hurst

TX














795,000


60














850,000


8

Wireless
Internet
Service
for
Residents












1,000,000


10

Public
Safety

New
fire
sta3on
to
improve
service
to
south
Hurst.












5,500,000


12

Streets/Roads

Lighted
Street
Name
Sign
Program
to
increase
driver
visibility
and
safety
and
sign
post
replacement
(to
 breakaway
poles)
program














225,000


City

State

Program

Hurst

TX

Streets/Roads

Street
and
drainage
Improvements

at
6
loca3ons
to
prevent
flooding

Project
Descrip3on

Funding
Required 












275,000


Jobs

Hurst

TX

Streets/Roads

conversion
of
metal
detector
loops
to
ITERIS
camera
detec3on
systems
at
signalized
intersec3ons














160,000


4

Hurst

TX

Streets/Roads

Widening
of
Precinct
Line
Road
from
SH
10
to
city
limits














375,000


4

Hurst

TX

Streets/Roads














550,000


6

Hurst

TX

Streets/Roads

Chisholm
Park
Road
improvements
to
enhance
safety
of
childern
and
motorists,
including
traffic
signal
for
 access City
Street
Asphalt
overlay
replacement
program














425,000


10

Hurst

TX

Streets/Roads

City
wide
Trails
system












1,000,000


10

Hurst

TX

Streets/Roads












1,200,000


12

Hurst

TX

Streets/Roads

Reconstruc3on
of
Hayes
Lane
with
replacement
of
water
and
sewer
main
and
addi3on
of
storm
drainage
to
 prevent
flooding Thousand
Oaks/Campus
drive
streetscape
and
reconstruc3on
project












1,200,000


12

Hurst

TX

Streets/Roads

Melbourne
Road
widening,
Cheryl
to
Pipeline
Road












2,100,000


20

Hurst

TX

Streets/Roads

NE
Mall
decelera3on/accelera3on
lane
@820














205,000


20

Hurst

TX

Streets/Roads












2,000,000


21

Hurst

TX

Streets/Roads

Reconstruc3on
of
Pipeline
Road
from
Billie
Ruth
to
Precinct
Line
with
replacement
of
water
mains,
addi3on
of
 traffic
signal,
pedestrian
crossing,
sidewalks,
street
ligh3ng Cofonbelt
Trail
system












1,700,000


80

Hurst

TX

Streets/Roads












8,000,000


80

Hurst

TX

Water

Widening
of
Pipeline
Road
from
east
of
Precinct
Line
Road
eastward
to
city
limits
with
replacement
of
water,
 gas,
sewer
lines
and
addi3on
of
sidewalks Large
Valve
replacement
to
repair
or
replace
broken
or
worn‐out
large
water
valves
ranging
in
size
16"‐24".














110,000


1

Hurst

TX

Water

Bedford
Wastewater
Metering
Sta3on
















60,000


2

Hurst

TX

Water

Water
line
reloca3on
project:
SH
26
from
Mid‐Cites
to
city
limit
of
Colleyville














225,000


2

Hurst

TX

Water

Rehabilita3on
of
Valen3ne
elevated
storage
tank,
involving
structural
member
repair
and
total
re‐pain3ng.

Hurst Hurst Irving Irving

TX TX TX TX

Water Water CDBG CDBG

Sanitary
Sewer
Main
replacement
project
to
replace
old
sewer
mains,
mostly
vitrified
clay
lines. Water
Main
Replacement
project
to
replace
old
cast
iron
mains
that
cause
service
disrup3ons
and
customer
 Pump
Sta3on
System
Improvements:
Hackberry
and
Northgate
Pump
Sta3ons Concrete
Sewer
Line
Rehabilita3on:
Hackberry
Creek
Relief
Trunk
Sewer














575,000
 












550,000
 












550,000
 










1,250,000


5 6 6 4












1,100,000


6

Irving

TX

CDBG

Sanitary
Sewer
Rehabilita3on:
Nursery/Rock
Island
Railroad
Sanitary
Sewer
Improvements

Irving Irving Irving

TX TX TX

CDBG CDBG CDBG

Concrete
Sanitary
Sewer
Rehabilita3on:Loop
12/Grauwyler
Sanitary
Sewer
Rehabilita3on
 Concrete
Sanitary
Sewer
Rehabilita3on:
Delaware
Creek
Sanitary
Sewer
Rehabilita3on Delaware
Creek
Flood
Control
Improvements:
Channel
Expansion












2,200,000
 










1,400,000
 










5,400,000


6 8 10












8,500,000


10

Irving

TX

CDBG

Construc3on
of
Indoor
Mul3‐Purpose
Recrea3on
Facility

to
enhance
economic
viability
of
regional
mall
 










3,000,000


15

Irving

TX

CDBG

Green
Fleet
‐
E85
Fueling
Sta3ons:
Alterna3ve
Flex
Fuel
Technology
will
replace
current
gasoline
use
with
an
 85%
ethanol
and
15%
gasoline
blend
that
reduces
greenhouse
gas
emissions
such
as
CO2
by
39
‐
46%
 compared
to
gasoline
only.
 












300,000


20

Irving

TX

CDBG

Neighborhood
Park
Development
to
increase
open‐space
for
neighborhoods
lacking
park
programming 










5,000,000


20

Irving

TX

CDBG












6,000,000


20

Irving

TX

CDBG














500,000


20

Irving

TX

CDBG














150,000


25

Irving

TX

CDBG














500,000


25

Irving

TX

CDBG












1,700,000


30

Irving

TX

CDBG










20,000,000


50

Irving

TX

CDBG












3,500,000


50

Irving

TX

CDBG












7,000,000


50

Irving

TX

CDBG












1,500,000


75

Irving

TX

CDBG

Plymouth
Park
Rehabilita3on:
Produce
enhancements
in
the
Plymouth
Park
area
by
such
as
Story
Road
 Streetscape
Enhancement,
Grauwyler
Road
Realignment,
Forma3on
of
a
Corridor
Business
Associa3on,
 Reestablish
Neighborhood
Associa3on,
Story
Road
Land
Use Provide
for
the
construc3on
of
three
"green"/energy
efficient
homes
on
lots
recently
acquired
by
the
Irving
 Housing
Finance
Corpora3on.
These
three
homes
would
meet
Energy
Star
cerfica3on
and
would
be
1,400‐ 1,800
square
feet.
Funding
would
provide
for
 Irving
City
Facili3es
Solar
Project:
Installa3on
of
solar
panels
on
the
roof
of
City
Hall
for
use
in
solar
thermal
 water
hea3ng
system.
This
will
replace
the
use
of
natural
gas,
except
as
a
secondary
back
up
system.
 Installa3on
of
solar
panels
on
roof Portable
Hydrogen
Fuel
Cell
–
Backup
Generators:
Use
of
emissions
free
hydrogen
fuel
cell
as
a
back
up
 generator
to
power
City
of
Irving
facili3es
in
the
event
of
power
failure.
Fuel
cells
offer
cleaner,
more‐efficient
 alterna3ves
to
the
combus3on
of
g Purchase,
rehabilita3on,
and
resale
of
12
affordable
exis3ng
homes.
Homes
with
average
purchase
prices
of
 $70,000
and
repair
costs
of
$30,000
would
be
targeted.
These
homes
would
be
sold
to
low
and
moderate
 income
candidates
who
would
receive
down
payme Developent
of
Library/Senior
Recrea3on
Center
that
is
a
mul3‐use
facility
that
serves
as
an
anchor
to
a
planned
 regional
retail
development
enhancing
the
economic
development
of
the
region
while
providing
a
recrea3on
 loca3on
 Enhance
appearance
and
traffic
circula3on
at
intersec3on
of
Story,
Grauwyler
and
Irving
Blvd;
Relocate
fire
 sta3on
to
vicinity
of
proposed
reroute The
comple3on
of
Campión
Trails
includes
the
construc3on
of
14
miles
of
12’
wide
concrete
trails
which
can
be
 used
for
an
alterna3ve
mode
of
transporta3on,
such
as
bicycle
commu3ng.

Campión
Trails
is
an
adopted
 segment
of
the
larger
Trinity
Trails
S Energy
Efficient
Building
Systems:
Increase
the
number
of
City
Buildings
which
are
currently
controlled
by
our
 Central
Energy
Management
System.
The
summary
of
this
proposed
“Green
Project’
would
be
the
installa3on
 of
an
Energy
Management
System
at
exist ONCOR
Reloca3on
Project
–
Texas
Stadium
–
Reloca3on
of
ONCOR
Transmission
towers
to
the
perimeter
of
the
 Texas
Stadium
Property













3,065,168


100

Irving

TX

CDBG

Remodel
the
fire
sta3on
to
increase
response
3me,
improve
service
to
residents
and
businesses
while
making
 the
facility
compa3ble
with
future
DART
rail
line












8,000,000


100

Irving

TX

CDBG

Northwest
Branch
Library
will
be
a
25,000
square
foot
branch
library
which
will
replace
the
exis3ng
10,000
 square
foot
branch
housed
in
a
shopping
center.

The
building
will
be
designed
to
bring
state
of
the
art
library
 services
to
the
northwest
sec3on













8,000,000


250

3

City

State

Program

Irving

TX

CDBG

Project
Descrip3on

Irving

TX

CDBG

Irving

TX

CDBG

Waterstreet:
A
mixed
use
project
with
300,000
square
feet
of
retail,
600
residen3al
units
and
250,000
square
 feet
of
office
space
in
Urban
Center.



Irving

TX

CDBG

Irving

TX

Energy

Conven3on
Center/Entertainment
Venue:
275,000
square
foot
conven3on
center
and
mixed
use
 entertainment
district
project
will
be
on
40‐acres
in
the
Las
Colinas
Urban
Center.Components
of
the
project
 include
300,000
square
feet
of
entertainment
venue
on
t Increase
life
cycle
of
landfill
for
Irving
residents
and
customers
in
the
region.

Irving

TX

Energy

Green
Fleet
‐
E85
Fueling
Sta3ons:
Alterna3ve
Flex
Fuel
Technology
will
replace
current
gasoline
use
with
an
 85%
ethanol
and
15%
gasoline
blend
that
reduces
greenhouse
gas
emissions
such
as
CO2
by
39
‐
46%
 compared
to
gasoline
only.


Irving

TX

Energy

Irving

TX

Energy

Irving

TX

Energy

Irving

TX

Energy

Irving

TX

Public
Safety

Provide
for
the
construc3on
of
three
"green"/energy
efficient
homes
on
lots
recently
acquired
by
the
Irving
 Housing
Finance
Corpora3on.
These
three
homes
would
meet
Energy
Star
cerfica3on
and
would
be
1,400‐ 1,800
square
feet.
Funding
would
provide
for
 Installa3on
of
solar
panels
on
the
roof
of
City
Hall
for
use
in
solar
thermal
water
hea3ng
system.
This
will
 replace
the
use
of
natural
gas,
except
as
a
secondary
back
up
system.
Installa3on
of
solar
panels
on
roof
of
 Irving
Senior
Center
to
heat
pool
 Portable
Hydrogen
Fuel
Cell
–
Backup
Generators:
Use
of
emissions
free
hydrogen
fuel
cell
as
a
back
up
 generator
to
power
City
of
Irving
facili3es
in
the
event
of
power
failure.
Fuel
cells
offer
cleaner,
more‐efficient
 alterna3ves
to
the
combus3on
of
g Energy
Efficient
Building
Systems:
 Increase
the
number
of
City
Buildings
which
are
currently
controlled
by
our
Central
Energy
Management
 System.
The
summary
of
this
proposed
“Green
Project’
would
be
the
installa3on
of
an
Energy
Management
 System
at
exi Update
of
Radio
Communica3on
System
for
Police,
Fire,
Code
Enforcement
and
Animal
Services

Irving

TX

Public
Safety

Citywide
Security
System
(Biometric,
RFID,
Digital
Camera,
Water
Tower,
U3lity
Protec3on,
etc)


Irving

TX

Public
Safety

Regional
Radio
/
Fiber
Op3cs
Communica3ons
System
(Radio,
Data,
Voice,
Video,
Traffic,
Control,
Broadband,
 etc)


Irving

TX

Public
Safety

Irving

TX

Public
Safety

Irving
Mul3‐Use
Public
Safety
Command
and
Control
Complex:
The
Complex
would
encompass
Irving’s
 Emergency
Opera3ons
Center
(EOC),
Police
and
Fire
Training
Academy,
the
public
safety
and
service
radio
 management
system,
along
with
addi3onal
facili3es
s ONCOR
Reloca3on
Project
–
Texas
Stadium
–
Reloca3on
of
ONCOR
Transmission
towers
to
the
perimeter
of
the
 Texas
Stadium
Property


Irving

TX

Public
Safety

Remodel
fire
sta3on
#8
to
increase
response
3me,
improve
service
to
residents
and
businesses
while
making
 the
facility
compa3ble
with
future
DART
rail
line

Irving

TX

Public
Safety

Irving

TX

Streets/Roads

Construct
a
12,000
square
foot
fire
sta3on
#4
housing
a
truck
and
crew,
rescue
truck,
ambulance
and
bafalion
 chief.

The
sta3on
will
replace
exis3ng
sta3on
#4
which
is
outdated
and
too
small
to
meet
the
current
needs
of
 the
community.

The
building
w Enhance
appearance
and
traffic
circula3on
at
intersec3on
of
Story,
Grauwyler
and
Irving
Blvd;
Relocate
fire
 sta3on
to
vicinity
of
proposed
reroute

Irving

TX

Transit

Construct
DART/APT
Connector
in
the
Las
Colinas
Urban
Center

Irving

TX

Water

Pump
Sta3on
System
Improvements:
Hackberry
and
Northgate
Pump
Sta3ons

Irving

TX

Water

Concrete
Sewer
Line
Rehabilita3on:
Hackberry
Creek
Relief
Trunk
Sewer

Irving

TX

Water

Sanitary
Sewer
Rehabilita3on:
Nursery/Rock
Island
Railroad
Sanitary
Sewer
Improvements

Irving

TX

Water

Concrete
Sanitary
Sewer
Rehabilita3on:Loop
12/Grauwyler
Sanitary
Sewer
Rehabilita3on


Irving

TX

Water

Concrete
Sanitary
Sewer
Rehabilita3on:
Delaware
Creek
Sanitary
Sewer
Rehabilita3on

Irving

TX

Water

Delaware
Creek
Flood
Control
Improvements:
Channel
Expansion

Kileen

TX

Airport

North
Slope
Drainage
Flume

Kileen

TX

Airport

Runway
33
Blast
Pad














795,723


5

Kileen

TX

Airport

Runway
Slurry
Seal












5,834,825


15

Kileen

TX

CDBG

Downtown
park
space
development














350,000


8

Kileen

TX

CDBG

Downtown
underground
u3li3es












1,000,000


15

Kileen

TX

CDBG

Housing
Rehabilita3on
in
older
neighborhoods
(energy
efficiency)












1,000,000


15

Kileen

TX

CDBG

Downtown
HEB
redevelopment












2,000,000


20

Kileen

TX

CDBG

Downtown
street
improvements












2,000,000


20

Kileen

TX

CDBG

Expansion
of
Families
in
Crisis
for
emergency
shelter‐general
pop.












1,000,000


20

Kileen

TX

CDBG

Expansion
of
Greater
Kileen
Free
Clinic














500,000


20

Construct
a
12,000
square
foot
fire
sta3on
housing
a
truck
and
crew,
rescue
truck,
ambulance
and
bafalion
 chief.

The
sta3on
will
replace
exis3ng
sta3on
#4
which
is
outdated
and
too
small
to
meet
the
current
needs
of
 the
community.

The
building
will ICON:
A
335,737
square
feet
office
tower
which
includes
a
260‐unit
high
rise
residen3al
tower
and
250
room
 hotel
in
Urban
Center

Funding
Required

Jobs












5,000,000


275








350,000,000


2000








350,000,000


2000








350,000,000


3000












5,000,000


15














300,000


20














500,000


20














150,000


25














500,000


25










15,000,000


75










15,000,000


15












5,000,000


20










35,000,000


25










24,700,000


50












3,065,168


100












8,000,000


100












5,000,000


275












3,500,000


50












3,700,000


30












1,250,000


4












1,100,000


6












2,200,000


6












1,400,000


8












5,400,000


10












8,500,000


10














886,945


5

City

State

Program

Kileen

TX

CDBG

Sewer
Rehabilita3on
in
older
neighborhoods

Project
Descrip3on

Funding
Required 










1,000,000


Jobs 20

Kileen

TX

CDBG

Kileen

TX

CDBG

Water
line
replacement
in
older
neighborhoods












1,000,000


20

One
Stop
Center
for
Human
and
Social
Services












8,000,000


Kileen

TX

50

CDBG

Cultural
Ac3vi3es
Center












8,000,000


Kileen

60

TX

Housing

Electrical
upgrades
to
145
units














500,000


Kileen

TX

Housing

Porch
replacements
to
75
units
at
Moss
Rose














500,000


Kileen

TX

Housing

Water
line
replacements
to
145
units
of
public
housing














350,000


Kileen

TX

Housing

Electrical
upgrades
to
75
units
at
Moss
Rose














250,000


25

Kileen

TX

Housing

Gas
service
lines
upgrades
to
75
units
at
Moss
Rose














500,000


25

Kileen

TX

Public
Safety

Family
Resource
Coordinator
Program
















45,000


1

Kileen

TX

Public
Safety

Fully
staff
Regional
Airport














423,839


7

Kileen

TX

Public
Safety

Fully
staff
PD
Headquarters












5,992,655


44

Kileen

TX

Streets/Roads

Stagecoach
Rd
(Sec3ons
1‐4),
S.
FH
St
to
HH
City
Limits












5,000,000


Kileen

TX

Streets/Roads

Old
Florence
Rd,
Elms
Rd
to
Stan
Schlueter












1,980,750


16

Kileen

TX

Streets/Roads

Bunny
Trail,
Stan
Schlueter
Loop
to
reese
Creek
Rd












2,208,700


17

Kileen

TX

Streets/Roads

E.
Trimmier
Rd,
Stagecoach
to
Chaparral












2,663,150


21

Kileen

TX

Streets/Roads

Bacon
Ranch
Road,
US
190
Access
Road
to
Greenlee
Dr












3,195,850


25

Kileen

TX

Streets/Roads

Ft.
Hood
Projects
(SH
201
&
Mohawk;
Eastgate
SH
195
(Rancier
to
central);
US
190
railhead
(Overpass)












4,692,650


37

Kileen

TX

Streets/Roads

Lowes
Blvd
Extension,
Trimmier
Rd
to
Florence
Rd












5,668,300


45

Kileen

TX

Streets/Roads

Rosewood
Drive,
Stagecoach
to
Chaparral












5,945,125


47

Kileen

TX

Streets/Roads

Trimmier
Rd,
Stagecoach
to
Chaparral












6,047,500


47

Kileen

TX

Streets/Roads












6,099,375


48

Kileen

TX

Streets/Roads

Widen
US190
from
4
Lanes
to
6
Lanes
from
Copperas
Cove
City
Limits
to
Harker
Heights
City
Limits
with
 Approaches
&
Bridges
within
Exis3ng
ROW Bacon
Ranch
Rd,
WS
Young
Dr
to
Cunningham
Rd












6,719,250


53

Kileen

TX

Streets/Roads

Lifle
Nolan
Rd,
WS
Young
Dr
to
Cunnungham












7,461,875


59

Kileen

TX

Streets/Roads

Rosewood
Dr,
US190
to
Stagecoach












8,579,800


68

Kileen

TX

Streets/Roads

Elms
Road,
S.
FH
St
to
Carpet
Lane












8,915,625


70

Kileen

TX

Streets/Roads

Featherline
Rd,
Stagecoach
to
Chaparral










11,263,128


87

Kileen

TX

Streets/Roads

Trimmer
Road,
Right
Turn
lane
from
Lowes
Blvd
to
US190










15,898,300


125

Kileen

TX

Streets/Roads

Elms
Rd,
S.
FH
St
to
Clear
Creek
Rd.










18,666,900


148

Kileen

TX

Streets/Roads

Cunningham
Road
(Sec3ons
1‐5),
US190
to
Chaparral










25,013,790


198

Kileen

TX

Streets/Roads

Chaparral
Rd,
S.FH
St
to
HH
City
Limits










35,000,000


277

Kileen

TX

Water

Bell
Co.
WCID
No.
1
Project
Par3cipa3on

Kileen

TX

Water

City/Owner
Agreement
Waterline
Extension
Projects














200,000


0

Kileen

TX

Water

Citywide
Inflow/Infiltra3on
Study














250,000


0

Kileen

TX

Water

Miscellaneous
Rehabilita3on
Projects














300,000


0

Kileen

TX

Water

Lake
Road
Waterline














140,000


1

Kileen

TX

Water

Pump
Sta3on
#3
Upgrade














200,000


1

Kileen

TX

Water

Goodnight
Ranch
Wastewater
Interceptor,
Lib
Sta3on
#22
&
Forcemain














500,000


2

Kileen

TX

Water

Sep3c
Tank
Elimina3on
Program
Phase
V














500,000


2

Kileen

TX

Water

State
Hwy.
195/West
Stagecoach
Road/Reese
Creek
Road
Waterline














500,000


2

Kileen

TX

Water

Downtown
Water
&
Wastewater
Infrastructure
Replacement














950,000


4

Kileen

TX

Water

Lib
Sta3on
#8
Reconstruc3on












1,000,000


4

Kileen

TX

Water

Bundrant
Elevated
Storage
Tank












1,200,000


6

Kileen

TX

Water

N.
Reese
Creek
Wastewater
Interceptor,
Lib
Sta3on
#20
&
Forcemain












1,500,000


8

Kileen

TX

Water

Eastside
Water
&
Wastewater
Infrastructure
Phase
2












3,900,000


12

La
Porte

TX

CDBG

Main
Street
Redevelopment












4,800,000


300

La
Porte

TX

CDBG

Life
Style
Center












7,600,000


400

La
Porte

TX

Water

Sens
Road
U3lity
Reloca3on
for
street
widening












1,800,000


50

Laredo

TX

Airport

Rehabilitate
General
Avia3on
Apron
Phase
4












4,230,000


120

Laredo

TX

CDBG














250,000


40

Laredo

TX

CDBG

Eistefer
Park
Mul3‐purpose
Area‐park
improvements
includes
a
mul3puropose
field
and
other
amenites,
i.e.
 ligh3ng,
irriga3on,
hydro
seeding,
etc.

New
restroom
facili3es
and
racquetball
court
will
be
included Animal
Shelter












5,000,000


80

Laredo

TX

CDBG

Laredo

TX

Laredo Laredo












1,500,000


80

CDBG

Phase
III
Clinic
Renova3on
&
Parking
Lot
Expansion‐Renovate
the
TB,
primary
care,
well
child
and
maternity
 clincs
for
more
efficient
and
quality
health
care,
and
expand
parking
for
72
spaces
to
include
fencing Independence
Hills












3,500,000


100

TX

CDBG

Chacon
Hike
&
Bike
Trail












6,000,000


125

TX

CDBG

Slaughter
Park
Phase
II‐to
include
a
recrea3onal
pool,
Tech‐Rec
Center
and
outdoor
park
ameni3es












5,000,000


160

Laredo

TX

CDBG










11,000,000


175

Laredo

TX

CDBG












7,500,000


175

Laredo

TX

CDBG

Haynes
Recrea3on
Center
‐‐
a
recrea3on
center
of
approximately
35,000
sq.
b.
with
indoor
and
outdoor
 ameni3es Northwest
Recrea3on
Center
‐‐
a
recrea3on
center
of
approximately
35,000
sq.
b.
with
indoor
ameni3es
and
 outdoor
park
area South
Laredo
Library/WIC
Clinic












6,300,000


178

Laredo

TX

Public
Safety

Citywide
Wi‐Fi
Pilot
Project












1,000,000


55

Laredo

TX

Public
Safety

Bridge
Lane
Barrier
System














600,000


65

Laredo

TX

Public
Safety

Bridge
Aler3ng
System
















70,000


70

Laredo

TX

Public
Safety

Ambulance
Replacement
X
4
@
250,000.00












1,000,000


80

Laredo

TX

Public
Safety

Fire
Pumper
Replacement
X
4
@
350,000.00
each












1,400,000


100

Laredo

TX

Public
Safety

Aerial/
Ladder
Truck
Replacements
x
3
@
850,000.00
each












2,550,000


150

Laredo

TX

Public
Safety

City
of
Laredo
Fire
Administra3on
Center










10,000,000


400

Laredo

TX

Schools

TAMIU
Side
Walk
Projects














190,000


50

City

State

Program

Laredo

TX

Schools

Alternate
Entrance
(TAMIU)

Project
Descrip3on

Funding
Required 












680,000


Jobs 80

Laredo

TX

Schools

Comple3on
of
Loop
Road(TAMIU)

Laredo

TX

Schools

Historic
Housing(LCC
Main)














900,000


100












2,110,378


Laredo

TX

Schools

Portable
Buildings
(LCC
Main)












2,550,000


133 159

Laredo

TX

Schools

Athle3c
Field
Improvements(LCC
Main)












5,488,302


343

Laredo

TX

Schools

Infrastructure(LCC
Main)












5,503,000


344

Laredo

TX

Schools

South
Campus
Improvments
(LCC
South)












6,710,000


419

Laredo

TX

Schools

Historic
Buildings(LCC
Main)










15,868,411


993

Laredo

TX

Schools

New
Construc3on
Buildings(LCC
Main)










38,624,059


2225

Laredo

TX

Schools

Instruc3onal
Buildings(LCC
Main)










47,668,382


2980

Laredo

TX

Streets/Roads

River
Road
Project‐overlay
of
2"
asphalt
over
1.7
miles
of
newly
contructed
all
weather
Border
Patrol
road

Laredo

TX

Streets/Roads

Laredo

TX

Laredo

TX

Laredo














500,000


50

World
Trade
Bridge
Hazardous
Material
Containment
System
Retrofit
Project












1,063,000


145

Streets/Roads

WTB
Offsite
Containment
Facility












1,100,000


145

Streets/Roads

Canal
Street
Drainage













2,500,000


150

TX

Streets/Roads

India
Avenue
Drainage













1,700,000


150

Laredo

TX

Streets/Roads

Jacaman
Road
Bridge













2,500,000


150

Laredo

TX

Streets/Roads

Manadas
Creek
Drainage
Improvements












2,500,000


150

Laredo

TX

Streets/Roads

Rosario
Street
Improvement
w/
Drainage/Water
and
Sewer












2,500,000


150

Laredo

TX

Streets/Roads

San
Isidro
Hike/
Bike
trail












3,000,000


150

Laredo

TX

Streets/Roads

Bartlef
Avenue
Extension













3,000,000


200

Laredo

TX

Streets/Roads

Cuatro
Vientos
CSJ
0922‐33‐043










82,770,000


200

Laredo

TX

Streets/Roads

Cuatro
Vientos
CSJ
0922‐33‐096












9,946,755


200

Laredo

TX

Streets/Roads

Elijido
Avenue
Extension












1,660,000


200

Laredo

TX

Streets/Roads

Shiloh
Drive
Extension












1,300,000


200

Laredo

TX

Streets/Roads

Chihuahua/
Guadalupe
CSJ
0086‐01‐052










32,121,892


300

Laredo

TX

Streets/Roads

World
Trade
Bridge
Inspec3on
Sta3on
Expansion
Project












8,606,000


300

Laredo

TX

Transit

Bus
Replacement
(22)












7,600,000


Laredo

TX

Water

36"
Sanitary
Sewer
Trunk
Main‐South
Laredo














480,000


50

Laredo

TX

Water

24"
Water
Transmission
Line‐Michigan
Avenue
from
MOHOC
to
Interna3onal
Blvd.












3,918,000


125

Laredo

TX

Water

24"
Water
Transmission
Line‐Loop
20
from
TAMIU
Elevated
Storage
Tank













1,900,000


150

Laredo

TX

Water

South
Laredo
Wastewater
Treatment
Plant
1.5
MGD
Expansion












4,583,000


150

Laredo

TX

Water

Jefferson
Water
Treatment
Plan
Electrical
&
Filtra3on
Improvements










47,000,000


300

Laredo

TX

Water

North
Laredo
Wastewater
Treatment
Plant‐a
3
MGD
plant
which
will
provide
service
to
northeast
Laredo










12,000,000


300

Longview

TX

Public
Safety
















65,384


0

Longview

TX

Public
Safety












6,900,000


5

Longview

TX

Streets/Roads














300,000


15

Longview

TX

Transit














500,000


0

Longview

TX

Transit














386,000


0

Longview

TX

Transit

Personal
protec3ve
equipment
and
radio
equipment
for
SWAT
team
providing
regional
law
enforcement
 support. Interoperable
Radio
System
‐
construct
and
install
radio
system
tower
and
equipment
to
provide

interoperable
 digital
communica3on
system
for
police
department
and
other
public
safety
agencies. Downtown
Railroad
Quiet
Zones
are
designed
to
improved
safety
at
the
street/rail
crossings
and
reduce
noise
 levels
in
the
downtown
area. Electronic
Fare
Collec3on
System
‐
System
will
allow
transit
customers
to
u3lize
a
debit/credit
system
to
 provide
a
more
accountable
fare
collec3on
system.

This
will
limit
future
fare
increases
by
maximizing
 collec3on
at
current
rates. Transit
Bus
Replacement
Program
‐
Currently
plan
to
purchase
three
new
buses
to
replace
por3on
of
aging
 fleet
to
insure
reliable
service. Bus
Wash
Facility
‐
facility
to
properly
care
for
buses
and
equipment.
















20,000


2

Longview

TX

Water












1,575,000


10

Longview

TX

Water












6,800,000


30

Lu•in

TX

Water










35,000,000


150

McAllen

TX

Airport

East
Loop
281
Water
Line
Exens3on
to
promote
source
water
availability
to
area
of
the
city
currently
not
 served.

A
12"
in
water
line
is
proposed
to
serve
74
acres
of
undeveloped
land. Water
Treatment
Plant
Rehabilita3on
‐
this
planned
project
will
make
improvements
to
a
30
year
old
water
 treatment
plant
and
add
a
raw
water
resevoir
to
improve
overall
water
quality
and
lower
treatment
costs
and
 costs
to
water
customers. The
City
of
Lu•in
has
been
working
on
developing
water
resources
on
Lake
Sam
Rayburn
in
Angelina
County,
 Texas.

The
City
owns
water
rights
on
the
Lake
and
has
purchased
easements
and
obtained
permits
to
develop
 a
water
plant.

The
City
can
bid
the
proje Airside
Service
Road












1,500,000


0

McAllen

TX

Airport

Land
Acquisi3on












1,500,000


0

McAllen

TX

Airport

Mobile
Aircrab
Fire
Trainer














800,000


0

McAllen

TX

Airport

Terminal
Expansion
Design












1,500,000


0

McAllen

TX

CDBG

3
Miles
of
Sidewalk














400,000


McAllen

TX

CDBG

Helping
Hand
Grants
‐
25
borrowers














250,000


McAllen

TX

CDBG

Installa3on
of
Street
Ligh3ng














230,000


McAllen

TX

CDBG

New
Beginnings
Rehabilita3on/Replacement
(12)














252,000


McAllen

TX

CDBG

Re3ree
Haven
Park














250,000


McAllen

TX

CDBG

Scafered
Site
New
Construc3on
‐
5
Units














260,000


McAllen

TX

CDBG

5
Trail
restrooms
and
trail
parking
nodes














250,000


4

McAllen

TX

CDBG

Old
Waste
Water
Plant
Lagoon
Water
Conserva3on
Project














125,000


7

McAllen

TX

CDBG

Uvalde
Prac3ce
Fields
Parking
and
Shade
Structures














120,000


7

McAllen

TX

CDBG

Springfest
park
‐
Development
Sportsfiel
Use
(fencing,
restrooms,
irriga3on,
parking)














450,000


13

McAllen

TX

CDBG

Motorcross
Park
south
of
Airport
‐
development
for
off‐road
use
to
afract
people
to
MFE














150,000


16

McAllen

TX

CDBG

Los
Encinos
Park
‐
Construc3on
of
Family
Reunion
Pavilion














350,000


20

McAllen

TX

CDBG

Palmview
Community
Center
‐
Add
Fitness
Lifestyles
Fitness
Room
on
North
Side














325,000


26

McAllen

TX

CDBG

Trail
Development
of
Business
83
‐
Jackson
to
Taylor
Road














840,000


30

McAllen

TX

CDBG

Archer
Park
Rehabilitate
Amphitheater,
Landscaping,
Bandstand














900,000


53

City

State

Program

McAllen

TX

CDBG

McAllen

TX

Energy

Las
Palmas
Community
Center
‐
Demo
Old
Adult
Educa3on
Building
and
Build
New
Adult
Center
and
rehab
old
 building Upgrade
Electrical
Breakers
to
Current
Code

Project
Descrip3on

McAllen

TX

Energy

McAllen

TX

McAllen

Funding
Required

Jobs












2,250,000


130
















40,000


1

Solar
Shade
Repair
















20,000


2

Energy

Duct
Cleaning
and
Repair
















30,000


3

TX

Energy

HVAC
Balancing
















30,000


3

McAllen

TX

Energy

Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
DeLeon
Soccer
Complex
















25,000


4

McAllen

TX

Energy

Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Jackson
City
School
Park
















30,000


4

McAllen

TX

Energy

Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
La
Vista
Park
















35,000


4

McAllen

TX

Energy














120,000


4

McAllen

TX

Energy

Conversion
of
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Los
Encinos
‐
purchase
water
well
 south
of
Sara,
run
pipeline,
install
pump Ligh3ng
at
2nd
street
‐
Trenton
Road
to
Wisconsin
Road














110,000


4

McAllen

TX

Energy

Ligh3ng
at
Bicentennial
Trail
‐
Nolana
to
Pecan















135,000


4

McAllen

TX

Energy

Upgrade
Fluorescent
Fixtures














150,000


5

McAllen

TX

Energy

Cascade
Park
Lifle
League
Fields
















85,000


7

McAllen

TX

Energy

Los
Encinos
Soccer
Fields














150,000


7

McAllen

TX

Energy

North‐bound
Pedestrian
Interna3onal
Bridge
Canopy
(canopy
retrofit
with
photovoltaic
system)














270,000


10

McAllen

TX

Energy

Recycling
Center
Photovoltaic
System
Installa3on














350,000


10

McAllen

TX

Energy

Sentri
Lane
Canopy
at
Interna3onal
Port
of
Entry
(photovoltaic
retro‐fit)














162,000


10

McAllen

TX

Energy

City
Hall
Annex
at
Pecan
Re‐roofing
(cool
roof,
photovoltaic
system)














750,000


15

McAllen

TX

Energy

Conven3on
Center
Parking
Area
Ligh3ng
(photovoltaic
installa3on)














432,000


15

McAllen

TX

Energy

Conven3on
Center
Roof‐top
(photovoltaic
installa3on)














400,000


15

McAllen

TX

Energy

Intermodal
Transit
Terminal
Improvements
(photovoltaics
to
power
exterior
ligh3ng,
fans,
mis3ng)














250,000


15

McAllen

TX

Energy

North
Police
Training/Community
Center
(Addi3onal
funding
for
photovoltaic
installa3ons)














500,000


15

McAllen

TX

Energy

South‐bound
Interna3onal
Port
of
Entry
Canopy
(photovoltaic
system,
cool
roof)














378,000


15

McAllen

TX

Energy

Tax‐Office
Re‐roofing
(cool
roof,
photovoltaic
system)














600,000


15

McAllen

TX

Energy

Development
Services
Building












2,000,000


20

McAllen

TX

Energy

Quinta
Natural
Science
Indoor/Outdoor
Classroom
(energy
efficient
HVAC,
photovoltaics,
cool
roof)














540,000


20

McAllen

TX

Energy

Interna3onal
Museum
of
Arts
&
Sciences
(Energy
Efficient
HVAC,
photovoltaic
installa3on)












1,620,000


25

McAllen

TX

Energy

Conversion
of
13
Irriga3on
Pump
Sta3ons
from
potable
water
to
river
water
at
Hike
and
Bike
Trails














247,000


52

McAllen

TX

Energy

Development
Center
(cool/green
roof
with
photovoltaic
installa3on)












2,810,000


65

McAllen

TX

Energy

Parking
Garage
Roof‐top
Farmer's
Market
(photovoltaic
power
genera3on,
cool
roof)














250,000


80

McAllen

TX

Housing

Upgrade/modify
exis3ng
bathroom
facili3es
in
handicap
units
to
current
ADA
compliant
features
















30,000


McAllen

TX

Housing

ADA
Accessibility
Improvements
for
Cesar
Chavez
Learning
Center

















7,000


2

McAllen

TX

Housing

Cesar
Chavez
Learning
Center
parking
lot
re‐surface
and
striping
including
handicap
ramps
















25,000


4

McAllen

TX

Housing

ADA
Accessibility
Improvements
for
Vine
Terrace














200,000


6

McAllen

TX

Housing

Replace
Exis3ng
Vinyl
Tile
Flooring














130,000


6

McAllen

TX

Housing

Re‐surface
interior
streets
for
Vine
Terrace
















60,000


6

McAllen

TX

Housing

Replace
Interior
Doors
















60,000


7

McAllen

TX

Housing

Re‐surface
interior
street
for
Retama
Village
















30,000


8

McAllen

TX

Housing

Roof
Improvements
Including
Rain
Gufers














400,000


10

McAllen

TX

Housing

Replace
Exis3ng
Exterior
Doors
and
Screen
Doors

McAllen

TX

Housing

Construc3on
of
new
Community
Center
for
Vine
Terrace

McAllen

TX

Housing

McAllen

TX

McAllen














100,000


15












1,200,000


20

Replace
Exis3ng
Windows
in
all
Units
with
Energy
Efficient
Product














200,000


53

Public
Safety

Homeland
Security
Over3me
Program














375,693


10

TX

Public
Safety

Fire
Sta3on
#3












1,500,000


15

McAllen

TX

Public
Safety

Homeland
Security
Overlay
Patrol
Program












1,628,306


30

McAllen

TX

Public
Safety

North
Police
Community
Center












3,500,000


40

McAllen

TX

Public
Safety

Video
Surveillance
System












2,000,000


40

McAllen

TX

Streets/Roads

Mar3n
Avenue
widening
and
RR
crossing















400,400


20

McAllen

TX

Streets/Roads

Replacing
Impact
Afenuators
on
various
bridge
railings














252,000


23

McAllen

TX

Streets/Roads

29th
(Oxford
to
Sprague)












1,102,000


35

McAllen

TX

Streets/Roads

Auburn
(Main
to
10th)












1,160,000


35

McAllen

TX

Streets/Roads

Dove
(41st
to
Bentsen)












1,400,000


40

McAllen

TX

Streets/Roads

Bridge
replacements
along
Bicentennial
Ditch
and
Ditch
Regrading












4,208,000


50

McAllen

TX

Streets/Roads

Pavement
Recycling
(46
miles
Mill
and
Overlay
and
5
miles
full
depth
repair)










11,820,000


60

McAllen

TX

Streets/Roads














598,000


90

McAllen

TX

Streets/Roads

Turn
Lanes,
Signaliza3on,
Median,
Signage,
Delineators,
and
Other
Traffic
Devices
to
Improve
Traffic
Flow
and
 Increase
Safety
at
Various
Loca3ons
Througout
the
City. Bentsen
Road










13,000,000


100

McAllen

TX

Streets/Roads

Bicentennial
Road










13,000,000


100

McAllen

TX

Transit

Part
3me
Recep3onist
















10,000


0

McAllen

TX

Transit

Office
&
Common
area
Furniture
for
Bus
Terminal
















30,000


1

McAllen

TX

Transit

Transit
GIS
Planner
















40,254


1

McAllen

TX

Transit

Office
&
Common
Area
Furniture
for
Bus
Terminal
















30,000


1.05

McAllen

TX

Transit

Electronic
Informa3onal
Displays
(6@
$7,000)
















42,000


1.47

McAllen

TX

Transit

3
Administra3on
Vehicles
















45,000


1.58

McAllen

TX

Transit

Bus
Terminal
Signage
(Interior
&
Exterior)
















55,000


1.93

McAllen

TX

Transit

3
Administra3on
Vehicles
















45,000


2

McAllen

TX

Transit

Purchase
and
Installa3on
of
Bus
Shelters
















60,000


2

McAllen

TX

Transit

Marke3ng
Campaign














100,000


4

McAllen

TX

Transit

Purchase
2
Vans
for
Paratransit
Service














145,000


5

City

State

Program

McAllen

TX

Transit

Purchase
2
Vans
for
Paratransit
Service

Project
Descrip3on

Funding
Required 












145,000


Jobs 5.08

McAllen

TX

Transit

McAllen

TX

Transit

Conven3on
Center
Route














275,000


9.63

Express
Route














275,000


McAllen

TX

9.63

Transit

Express
Route














275,000


McAllen

10

TX

Transit

University
Circulator
Route














300,000


10

McAllen

TX

Transit

Purchase
1
Rolling
Stock
‐
Implement
new
Express
Route












3,000,000


10.5

McAllen

TX

Transit

Construc3on
of
Parking
Lot
for
Bus
Terminal














400,000


14

McAllen

TX

Transit

Parking
Lot
Improvements
for
Bus
Terminal














400,000


14

McAllen

TX

Transit

Purchase
and
Installa3on
of
4
Solar
Powered
A/C
Shelters














580,000


20.3

McAllen

TX

Transit

Service
Hour
Expansion














580,000


20.3

McAllen

TX

Transit

Service
Expansion
(through
10
pm
daily
&
Sunday
10
am
‐
7
pm)














700,000


24

McAllen

TX

Transit

Purchase
5
30b
Transit
Buses
Medium
Duty












1,025,000


35.88

McAllen

TX

Transit

Pedestrian
Walkway/Canopies












1,200,660


42

McAllen

TX

Transit

Pedestrian
Walkway/Canopies












1,200,660


42.02

McAllen

TX

Transit

Purchase
4
Hybrid
Buses












2,000,000


70

McAllen

TX

Transit

Purchase
of
Rolling
Stock
(12
buses)












4,200,000


147

McAllen

TX

Water

3,000
L.F.
of
54"
Pipeline
for
N.
Water
Plant












1,000,000


5

McAllen

TX

Water

4
MGD
expansion
to
N.
Water
Treatment
Pl.












5,000,000


5

McAllen

TX

Water

3,000
L.F.
of
48"
Pipeline
for
new
Reservoir














750,000


8

McAllen

TX

Water

6th
and
Mar3n
Lib
Sta3on
Replacement














750,000


10

McAllen

TX

Water

Colbath
Avenue
Lib
Sta3on
Replacement














750,000


10

McAllen

TX

Water

De‐watering
facili3es
at
SW.
Water
Plant












1,500,000


10

McAllen

TX

Water














790,000


10

McAllen

TX

Water

Lib
Sta3on
Replacement
at
2nd
&
Jonquil.

The
project
replaces
a
failing
lib
sta3on
and
will
improve
air
quality
 through
treatment
and
removal
of
hydrogen
sulfide.

Construc3on
will
take
6
months
to
complete
in
2009. 13,000
L.F.
of
60"
Pipeline
for
New
Reservoir












5,000,000


25

McAllen

TX

Water

Reservoir
Pipeline










14,000,000


100

McAllen

TX

Water










40,000,000


125

McKinney

TX

CDBG

Wastewater
Treatment
Plant
Expansion
from
6
to
18
million
gallons
per
day
capacity.

The
project
will
improve
 quality
of
treated
wastewater
and
biosolids,
eliminate
use
of
hazardous
chlorine
gas,
incorporate
a
more
 energy
efficient
process.

Construc3on Housing
Rehab
Grant

McKinney

TX

Energy

Green
Coordinator














120,000


1

McKinney

TX

Energy

Exis3ng
Building
Retrofiqng












1,000,000


30

McKinney

TX

Housing

Sec3on
8
Apartment
Rehab












3,000,000


50

McKinney

TX

Public
Safety

School
Resource
Officers














250,000


2

McKinney

TX

Public
Safety














550,000


63

McKinney

TX

Public
Safety

McKinney

TX

Public
Safety

Public
Safety
Building
Phase
1A
‐
New
Detec3ve
Office
Space
&
Building
Parking
Area
(50
construc3on
+
13
 ongoing
jobs) Public
Safety
Building
Phase
2
‐
25,000
sf
building
for:
ppty
evdnc,
crime
lab,
canine
kennels,
crime
vehicle
strg,
 expnd'd
SWAT
eqpmt
strg
(75
+
5
ongoing
jobs) Fire
Sta3on
#9
‐
North
(200
+
18
ongoing
jobs)

McKinney

TX

Public
Safety

Fire
Sta3on
#8
‐
Craig
Ranch
18,000
sf
5‐bay
(200
+
21
ongoing
jobs)

McKinney

TX

Streets/Roads

CIP
Roadways

McKinney

TX

Transit

CCART/small
bus
funding














500,000


McKinney

TX

Water

CIP
Water/Sewer












5,000,000


100

Mesquite

TX

Streets/Roads

Alley
Reconstruc3on
Project












3,000,000


0

Mesquite

TX

Streets/Roads

Casa
View
Sidewalk
Rehabilita3on
Project














290,000


0

Mesquite

TX

Streets/Roads

Dribwood
Drive
Extension












1,000,000


0

Mesquite

TX

Streets/Roads

Lawson/Shannon/Lumley












1,500,000


0

Mesquite

TX

Streets/Roads

Street
Light
Replacement
Project












1,000,000


0

Mesquite

TX

Streets/Roads

Town
East
Boulevard
Concrete
Replacement
Project












2,000,000


0

Mesquite

TX

Streets/Roads

Traffic
Signal
Improvements












1,500,000


0

Mesquite

TX

Water

Edgemont
Park
Phase
4
Water
Line
Replacement
Project












1,000,000


0

Mesquite

TX

Water

Northridge
Sanitary
Sewer
Rehabilita3on
Project












4,000,000


0

Mesquite

TX

Water

South
Mesquite
Creek
Sanitary
Sewer
Trunk
Main
Replacement












8,000,000


0

Missouri
City

TX

CDBG

Sidewalk
Replacement
Program
to
increase
and
encourage
pedestrian
traffic.














900,000


10

Missouri
City

TX

CDBG

Animal
Shelter
Renova3on
to
increase
the
capacity
and
bring
the
building
up
to
code.














500,000


15

Missouri
City

TX

Energy

LED
Street
Light
Upgrade
Program
to
increase
energy
efficiency
and
reduce
opera3onal
costs.












1,000,000


10

Missouri
City

TX

Public
Safety

COPS
‐
2
addt'l
officers

Missouri
City

TX

Streets/Roads

Missouri
City

TX

Missouri
City

TX

Missouri
City












1,000,000













5,000,000


80












6,000,000


218










10,000,000


221














598,000


50














100,000


2

Field
Crest
Street
Reconstruc3on












1,325,807


20

Streets/Roads

Independence
Boulevard
Extension












1,650,000


20

Streets/Roads

Turtle
Creek
Street
Reconstruc3on












2,375,550


20

TX

Transit

Transit
&
Light
Rail
Study














500,000


10

Missouri
City

TX

Water

Construct
a
hydro
pneuma3c
tank
and
storage
tank
in
the
Mustang
Bayou
Regional
Water
Plant












2,000,000


15

Missouri
City

TX

Water

Expansion
of
exis3ng
Vicksburg
Joint
Powers
WWTP
from
500,000
GPD
to
950,000
GPD.












2,500,000


25

Missouri
City

TX

Water

Steep
Bank/Flat
Bank
WWTP
Expansion
from
1.5
to
3.0
MGD












4,000,000


25

North
Richland
Hills

TX

CDBG

Housing
Rehabilita3on














122,000


15

North
Richland
Hills

TX

CDBG

Street
Reconstruc3on‐Harmonson
Road
(Dawn
Drive
East
to
Creek)














999,424


20

North
Richland
Hills

TX

CDBG

Water
Main
Replacement‐Onyx
Drive
North
(Onyx
Drive
North
West
to
Big
Fossil
Creek)














157,500


20

North
Richland
Hills

TX

Energy

















9,000


3

North
Richland
Hills

TX

Energy

Fire
Department
Vehicles
Shoreline
Power‐
install
shoreline
power
at
the
fire
training
facility
to
eliminate
idling
 for
electrical
equipment. Automa3c
ligh3ng
controls
















22,000


10

North
Richland
Hills

TX

Energy

De‐lamp
City
Buildings
















49,000


10

City

State

Program

North
Richland
Hills

TX

Energy

North
Richland
Hills

TX

North
Richland
Hills

Project
Descrip3on

Funding
Required

Jobs
















14,384


10

Energy

Solar
Panel
Project‐Install
62
solar
panels
on
patrol
and
off
road
equipment
to
reduce
onboard
electric
bafery
 chargers. Window
Replacement
















80,000


10

TX

Energy

HVAC
Central
Control














378,000


20

North
Richland
Hills

TX

Energy

HVAC
Replacement

North
Richland
Hills North
Richland
Hills

TX TX

Energy Public
Safety

20 25

North
Richland
Hills

TX

Public
Safety

Re‐roofing Regional
Public
Safety
Training
Facility‐Build
a
police/fire
training
facility
that
would
give
much
needed
training
 access
to
area
agencies. Youth
Summer
Camp‐Work
with
"at‐risk"
children
in
interac3ve
camp
with
local
leaders














111,000
 












560,000


North
Richland
Hills

TX

Public
Safety

Explorer
Post‐
develop
leadership
ability
in
teenagers
by
leqng
them
explore
the
police
field.

North
Richland
Hills

TX

Public
Safety

North
Richland
Hills

TX

Public
Safety

North
Richland
Hills

TX

Public
Safety

Family
Resource
Coordinator‐
create
a
posi3on
that
works
with
at
risk
families
of
abuse
and
neglect.

The
FRC
 will
council
and
assist
these
families
through
short
term
interven3on. Volunteer
Patrol‐Volunteers
respond
to
non‐police
mafers
and
act
as
"eyes
and
ears"
on
the
street.

Help
 decrease
3me
because
officers
could
respond
to
crime. City
Wide
Surveillance
Camera
Project‐
Install
cameras
in
areas
of
higher
rates
of
crime
and
city
property.












3,500,000


5

North
Richland
Hills

TX

Streets/Roads

North
Tarrant
Express‐Improving
Loop
820
within
North
Richland
Hills
city
limits








600,000,000


600

North
Richland
Hills

TX

Streets/Roads

Various
streets
throughout
the
City
that
require
complete
reconstruc3on










22,991,050


660

North
Richland
Hills

TX

Water

Sanitary
Sewer
Main
Replacement‐
Various
Loca3ons
Throughout
the
City










21,348,866


300

North
Richland
Hills

TX

Water

Water
Main
Replacement‐
Various
Loca3ons
Throughout
City










24,145,580


320

Pharr

TX

CDBG

Centennial
Plaza

Pharr

TX

CDBG

Pharr

TX

Pharr

TX

Pharr Pharr












3,000,000
 














10,000


0.5
















35,000


1
















45,000


1
















51,000


1














200,000


12

Old
Fire
Sta3on
Museum












1,750,000


106

Public
Safety

Public
Safety
Radio
System












9,000,000


20

Streets/Roads

STEP
‐
"Railroad
Heritage
Park"












2,200,000


130

TX

Streets/Roads

STEP
‐
"Farm
to
Market"
Museum












2,600,000


160

TX

Streets/Roads

STEP
‐
"Pedestrian
Mobilty
&
Safety
Improvements"












8,200,000


500

Port
Aransas

TX

Airport

Mustang
Beach
Airport
improvement










10,000,000


100

Port
Aransas

TX

Energy

Gas
Department
energy
retrofit
















25,000


0

Port
Aransas

TX

Energy

Community
Cener
energy
retrofit
















50,000


1

Port
Aransas

TX

Energy

Library
energy
retrofit
















50,000


1

Port
Aransas

TX

Energy

Police/EMS/Court
Building
energy
retrofit














100,000


2

Port
Aransas

TX

Energy

Civic
Center/City
Hall
energy
retrofit














200,000


4

Port
Aransas

TX

Public
Safety

Addi3onal
police
officers














300,000


4

Port
Aransas

TX

Schools

Update
computer
labs
and
servers
















25,000


0

Port
Aransas

TX

Schools

Retrofit
buildings
for
energy
efficiency
















75,000


1

Port
Aransas

TX

Transit

Park
and
Ride
facili3es
‐
Ferry,
Harbor
Island














250,000


2

Port
Aransas

TX

Transit

Fuel‐efficient
trolleys
and
buses














500,000


5

Port
Aransas

TX

Water

Energy‐efficient
natural
gas
power
system
for
wastewater
plant
and
line












2,000,000


20

Port
Aransas

TX

Water

Enlarge
water
line
from
San
Patricio
water
district
for
all
Mustang
Island












8,000,000


80

Rowlef

TX

CDBG

Delia
Street
paving,
drainage
and
waterline
improvements














726,000


10

Rowlef

TX

Energy

5
Wind
Driven
Turbine/Generator
Systems














300,000


20

Rowlef

TX

Public
Safety














834,796


8

Rowlef

TX

Streets/Roads










33,000,000


20

Rowlef

TX

Water

Community
Policing
Project:
Project
consists
of
five
(5)
addi3onal
patrol
officers,
two
(2)
neighborhood
police
 officers
and
one
(1)
crime
analyst
with
associated
equipment
and
personnel
compensa3on
to
conduct
 community
policing
projects
to
include
neig Merrif/Liberty
Grove
Road
Interconnector
‐
Six‐lane
divided
roadway
from
Merrif
Road
to
the
President
 George
Bush
Turnpike. Rowlef
Road
12"
Waterline














800,000


4

Rowlef

TX

Water

Main
Street
Lib
Sta3on












1,120,000


6

Rowlef

TX

Water

Rowlef
Road
Lib
Sta3on












1,713,000


6

Rowlef

TX

Water

Princeton
Road
24"
Waterline












2,000,000


8

Rowlef

TX

Water

Kenwood
Heights
water
and
sanitary
sewer
improvements.












3,000,000


10

San
Antonio

TX

Airport

Provide
infrastructure
support
for
the
Airport
Emergency
Opera3ons
Center
(AEC)















150,000


5

San
Antonio

TX

Airport

Part
150
‐
Limited
Noise
Compa3bility
Study














100,000


7

San
Antonio

TX

Airport

Parking
Revenue
Control
System 










8,000,000


10

San
Antonio

TX

Airport












2,571,000


14

San
Antonio

TX

Airport

Develop
and
install
a
Wide
Area
Network
(Wireless
Mesh)
infrastructure
to
provide
interoperable
and
 redundant
communica3ons
to
federal,
state
and
local
emergency
responders
during
natural
and
man‐made
 disasters
and
terrorist
afacks. S3nson
Airport
Obstruc3on
Clearing














450,000


25

San
Antonio

TX

Airport

Environmental
Remedia3on
(Apron
Construc3on)














500,000


40

San
Antonio

TX

Airport

Repair
Airport
Perimeter
Road












1,400,000


40

San
Antonio

TX

Airport












4,000,000


45

San
Antonio

TX

Airport

Construct
a
mul3‐use,
infec3ous
disease
quaran3ne
and
training
facility
on
San
Antonio
Interna3onal
Airport
 property
to
isolate
ill
or
poten3ally
ill
airline
passengers
in
order
to
maintain
the
con3nuity
of
airport
 opera3ons
while
the
isolated
indi Taxiway
Romeo
Charlie
Extension












4,100,000


100

San
Antonio

TX

Airport

Construc3on
of
New
Airport
Terminal
C








125,000,000


500

San
Antonio

TX

CDBG

Alamodome
Improvements
and
Repairs










10,000,000


San
Antonio

TX

CDBG

BRAC
Road
Improvements










42,000,000


San
Antonio

TX

CDBG

Central
Library
Modernaza3on/Expansion










75,000,000


San
Antonio

TX

CDBG

Conven3on
Center
Expansion/Improvements
Phase
I








200,000,000


San
Antonio

TX

CDBG

Downward
Ligh3ng
Retrofits
around
Camp
Bullis

San
Antonio

TX

CDBG

Ini3al
Development
of
Crystal
Hills
Park












3,000,000


San
Antonio

TX

CDBG

Inter‐City
Branch
Library
Renova3on/Expansion










15,000,000















500,000


City

State

Program

San
Antonio

TX

CDBG

Mission
Drive‐In
Library

Project
Descrip3on

Funding
Required 










6,000,000


Jobs

San
Antonio

TX

CDBG

OP
Schnabel
Park
second
entrance













1,500,000


San
Antonio

TX

CDBG

Sunken
Garden
Park
Project












2,000,000


San
Antonio

TX

CDBG

Renova3ons
at
the
Lifle
Carver
Cultural
Center
















10,000


San
Antonio

TX

CDBG

Low
Water
Crossing
Improvements














535,000


7

San
Antonio

TX

CDBG

Improvements
of
the
Carver
Community
Cultural
Center














250,000


10

San
Antonio

TX

CDBG

Improvements
to
the
Carver
Annex















200,000


10

San
Antonio

TX

CDBG

Crea3on
of
a
new
5,000
SF
senior
mul3‐purpose
service
center












2,000,000


20

San
Antonio

TX

CDBG












1,300,000


43

San
Antonio

TX

CDBG

Increase
the
size
of
three
Community
Centers
including
the
crea3on
of
career
centers/labs
comprised
of
21
 computers
and
kiosks. Voelcker
Park
Trail
System












5,000,000


50

San
Antonio

TX

CDBG

San
Antonio

TX

San
Antonio

5














908,000


100

CDBG

Moderniza3on
and
improvement
of
eight
Community
Family
Resource
and
Learning
Centers
and
three
 Community
Centers
(HVAC,
roofing,
ligh3ng,
flooring,
pain3ng,
soundproofing) Park
Projects












7,250,000


106

TX

CDBG

City
wide
Sidewalks
Improvements










10,766,220


158

San
Antonio

TX

CDBG

Crea3on
of
four
new
10,000
SF
senior
mul3‐purpose
service
centers










20,000,000


168

San
Antonio

TX

CDBG

Haven
for
Hope
Homeless
Campus
‐Child
Care
Center,Women's
and
Family
Dorm










10,900,000


220

San
Antonio

TX

CDBG

Construct
a
new
Public
Safety
Answering
Point
(PSAP)










10,000,000


350

San
Antonio

TX

CDBG

City
Wide
Street
Impovements










63,518,743


935

San
Antonio

TX

CDBG

Traffic
Signal
(Wood
Pole
Conversions)










81,250,000


1196

San
Antonio

TX

Energy

The
Independence,
An3‐idling
Package
by
Xtreme
Energy—
To
be
installed
on
14
Airport
Police
vehicles
















91,000


2

San
Antonio

TX

Energy

Trailer‐mounted
Microgrid














350,000


6

San
Antonio

TX

Energy

500
kW
solar
array
at
the
south
end
of
Terminal
One
short‐term
parking












5,000,000


10

San
Antonio

TX

Energy

Cri3cal
Fuel
Infrastructure












1,000,000


10

San
Antonio

TX

Energy

Henry
B.
Gonzales
Conven3on
Center
Solar
PV
Array












4,000,000


10

San
Antonio

TX

Energy

Ligh3ng
Retrofits
for
City‐Owned
Facili3es












1,200,000


16

San
Antonio

TX

Energy

Solar
Shade
Ini3a3ve












4,000,000


30

San
Antonio

TX

Energy










10,000,000


30

San
Antonio

TX

Energy

Tree
Plan3ng
Ini3a3ve—200,000
trees
planted
in
public
property
for
the
following
purposes:
shading
of
heat
 affected
public
buildings,
parking,
and
roads;
improved
storm
water
management
in
high
runoff
and
ponding
 loca3ons;
visual
screening;
air
qualit Traffic
Signal
System
Moderniza3on










14,500,000


38

San
Antonio

TX

Energy

Pay
as
You
Save
(PAYS)
Green
Retrofit
Program












4,000,000


100

San
Antonio

TX

Public
Safety

Digital
Imagery
Capture
and
Storage

San
Antonio

TX

Public
Safety

San
Antonio

TX

Public
Safety

Downtown
Bicycle
Patrol
Office 





Rental,
Finish‐out,
furniture,
computers,
 





Bicycle
storage,
etc. In
car
Video
Equipment












1,300,000


San
Antonio

TX

Public
Safety

Mobile
Computer
Replacement
(
Patrol
Vehicles)












4,485,000


San
Antonio

TX

Public
Safety

San
Antonio

TX

Public
Safety

Mounted
Horse
Patrol
Unit
 




Horses,
Stables,
Tack,
Equipment,
Feed,
Vet Patrol
Vehicles,
including
motorcycles












7,534,800


San
Antonio

TX

Public
Safety

San
Antonio

TX

Public
Safety

Storefront
Police
Facili3es
(
2)
 




Rental,
Finish‐out,
computers,
furniture 















COPS
Funds‐Hire
50
new
police
officers












1,750,000


50

San
Antonio

TX

Streets/Roads



Low
Water
Crossing
Imrprovements












1,649,212


24

San
Antonio

TX

Streets/Roads



Alley
Maintenance












4,000,000


60

San
Antonio

TX

Streets/Roads



Sidewalk
Improvements












7,003,243


103

San
Antonio

TX

Streets/Roads



ADA
(Downtown)










10,000,000


147

San
Antonio

TX

Streets/Roads



Intersec3on
Improvements










12,438,331


183

San
Antonio

TX

Streets/Roads


Citywide
Bridge
Program










20,000,000


295

San
Antonio

TX

Streets/Roads



Signalized
Intersec3on
Equipment
Upgrades










30,330,000


447

San
Antonio

TX

Streets/Roads



Traffic
Signals
(Wood
Pole
Conversions)










60,750,000


895

San
Antonio

TX

Streets/Roads



City
Wide
Streets
Improvements










88,600,000


2335

San
Antonio

TX

Water










50,000,000


200

Tyler

TX

Public
Safety

San
Antonio
River
Improvements
Project,
s3mulus
funding
would
allow
for
comple3on
of
the
en3re
Phase
II
 por3on
of
the
project. Police
Personnel
Project














500,000


10

Waco

TX

Airport

Waco
Regional
Airport
Runway
Safety
Areas














450,000


10

Waco

TX

CDBG

Pedestrian
Safety(sidewalks)












1,000,000


20

Waco

TX

CDBG

Webster
&
Cross
Roads
Drainage












1,000,000


20

Waco

TX

CDBG

Sul
Ross
Park
Redevelopment












3,000,000


30

Waco

TX

CDBG

US
84
Hike
&
Bike
Trail
Bridge












2,000,000


40

Waco

TX

CDBG

Mammoth
Site,
Phase
2












6,000,000


60

Waco

TX

CDBG

Dewey
Recrea3on
Center












7,500,000


80

Waco

TX

Public
Safety

Police
Firing
Range












2,000,000


30

Waco

TX

Public
Safety

Public
Safety
Radio
System
Repalcement












8,000,000


30

Waco

TX

Public
Safety

Fire
Sta3on
Construc3on
at
four
loca3ons












9,500,000


70

Waco

TX

Streets/Roads

Ritchie
Road‐RR
to
Warren












2,000,000


40

Waco

TX

Streets/Roads

Loop
574‐I35
to
SH6










20,000,000


300

Waco

TX

Transit

ADA
&
Medicare
Scheduling
Sobware














155,000


1

Waco

TX

Transit

10
Paratransit
vans














520,000


5

Waco

TX

Transit

15
ADA
vans












1,425,000


10

Waco

TX

Water

Central
Texas
Water
Reclama3on












7,000,000


100














570,000















240,000















450,000















280,000


City

State

Program

Waco

TX

Water

Regional
Wastewater
Infrastructure

Project
Descrip3on

Funding
Required Jobs 








10,000,000
 150

Winnsboro

TX

Airport

Airport
Terminal
Update
and
Technology

Winnsboro

TX

Airport

Expand
Airport
Road
to
Wide
Two
Lane
or
4‐Lanes












1,000,000


5

Winnsboro

TX

Airport

Update
all
Community
facili3es
to
clean
or
energy
efficient
energy












3,000,000


10

Winnsboro

TX

Airport

Development
of
Infrastructre
of
Industrial
Land
Adjacent
to
Airport












5,000,000


30

Winnsboro

TX

Airport

Runway
Extension
for
Airport












4,000,000


30

Winnsboro

TX

CDBG

City
Maintenance
Equipment
‐
Backloader
















65,000


1

Winnsboro

TX

CDBG

Community
Development
Assistant














100,000


1

Winnsboro

TX

CDBG

Skateboard
Park
Facility














200,000


1

Winnsboro

TX

CDBG

Community
Founda3on
Seed
Money
to
fund
projects
of
$50,000
+
per
year
indefinitely












1,000,000


2

Winnsboro

TX

CDBG

Park
Development














500,000


2

Winnsboro

TX

CDBG

African
American
and
Regional
Cultural
Museum














300,000


3

Winnsboro

TX

CDBG

Art
District
Enhancements














350,000


3

Winnsboro

TX

CDBG

Documentary
of
Projects
Developed
(Photography,
Video,
Wrifen
Format,
etc.)














180,000


3

Winnsboro

TX

CDBG

Master
plan
Update














100,000


3

Winnsboro

TX

CDBG

Workforce
Training
Center












2,000,000


5

Winnsboro

TX

CDBG

Arts
park
/
Farmers
Market












1,000,000


6

Winnsboro

TX

CDBG

Develop
City
Wide
Free
or
near
Free
Internet
System
‐
Wireless














250,000


7

Winnsboro

TX

CDBG

Tourism
Marke3ng














250,000


7

Winnsboro

TX

CDBG

Spray
Park
Installa3on














600,000


8

Winnsboro

TX

CDBG

VFW
Facili3es
Enhancements














200,000


8

Winnsboro

TX

CDBG

Neighborhood
Center












2,500,000


10

Winnsboro

TX

CDBG

Rodeo
Grounds
Development
‐
New














300,000


10

Winnsboro

TX

CDBG

Senior
Center
Enhancements














250,000


10

Winnsboro

TX

CDBG

City
Mural
Projects












1,000,000


20

Winnsboro

TX

CDBG

Downtown
development
and
enhancements












5,000,000


20

Winnsboro

TX

CDBG

Medical
Facili3es
Expansions












5,000,000


20

Winnsboro

TX

CDBG

New
City
Hall
with
Solar
Power












3,000,000


20

Winnsboro

TX

CDBG

Non‐Profit
Facili3es,
Enhancements,
and
Opera3ons












2,000,000


20

Winnsboro

TX

CDBG

Recrea3ons
Park












2,000,000


20

Winnsboro

TX

CDBG

Development/Purchase
of
60
Acre
Industrial
Land














750,000


30

Winnsboro

TX

CDBG

Streets
and
Sidewalks












4,000,000


30

Winnsboro

TX

CDBG

Medical
Park
Development












5,000,000


35

Winnsboro

TX

CDBG

Increase
City
Staff
Capacity
if
Package
is
Passed












4,000,000


50

Winnsboro

TX

CDBG

Restora3on
of
Historical
Buildings












5,000,000


100

Winnsboro

TX

CDBG

Business
Loans
‐
Revolving
Funds












2,000,000


133

Winnsboro

TX

CDBG

Incen3ves
for
non‐pollu3ng
Industries
to
Locate
in
Area












6,000,000


1000

Winnsboro

TX

Energy

Fiqng
Art
Center
to
be
Energy
Efficient














750,000


5

Winnsboro

TX

Energy

Residen3al
and
Business
Incen3ves
to
Retrofit
facili3es
to
clean
energy












2,000,000


20

Winnsboro

TX

Energy

Pending
Recruitment
of
Windmill
Produc3on
Company










12,000,000


24

Winnsboro

TX

Housing

Fix
Flood
Zone
Gufering












5,000,000


15

Winnsboro

TX

Housing

Funds
to
S3mulate
and
Incen3vize
New
Apartments
and/or
Homes












2,000,000


15

Winnsboro

TX

Housing

Funds
for
Sub‐housing
Replacement












5,000,000


20

Winnsboro

TX

Public
Safety

City
Vehicles














120,000


Winnsboro

TX

Public
Safety

Purchase
of
Tasers
















20,000


Winnsboro

TX

Public
Safety

Update
Weather
Warning
System














200,000


Winnsboro

TX

Public
Safety

Full
Time
Director
for
Drug
Task
Force














180,000


2

Winnsboro

TX

Public
Safety

Animal
Shelter
Expansion














500,000


4

Winnsboro

TX

Public
Safety

At‐Risk
Youth
Development
Program
and
Assistance














600,000


4

Winnsboro

TX

Public
Safety

New
Fire
Sta3on












1,000,000


5

Winnsboro

TX

Public
Safety

Retrofit
City
Vehicles
for
Clean
Energy












1,000,000


5

Winnsboro

TX

Public
Safety

Increase
Police
Force














800,000


7

Winnsboro

TX

Public
Safety

Women's
Drug
Rehab
Enhancements












2,000,000


7

Winnsboro

TX

Public
Safety

Visitor
Informa3on
Center












2,000,000


10

Winnsboro

TX

Public
Safety

Development
of
Mens
Rehab
Center












4,000,000


12

Winnsboro

TX

Schools

Classroom
Technology












1,000,000


Winnsboro

TX

Schools

Business
Incubator
Developmnet












1,000,000


20

Winnsboro

TX

Schools

Restora3on
of
or
new
development
of
all
school
buildings










10,000,000


150

Winnsboro

TX

Streets/Roads

Way
finding
Signage














100,000


Winnsboro

TX

Streets/Roads

Conversion
to
LED
Stop
Lights
















10,000


0

Winnsboro

TX

Streets/Roads

12
Passenger
Van
to
Transport
Seniors














100,000


1

Winnsboro

TX

Streets/Roads

Tree
Plan3ng
and
Beau3fica3on














100,000


1

Winnsboro

TX

Streets/Roads

City
Employees
or
Contactors
Dedicated
to
City
Cleanup














200,000


3

Winnsboro

TX

Streets/Roads

Streetscape














500,000


3

Winnsboro

TX

Streets/Roads

Downtown
Parking
Expansion














500,000


5

Winnsboro

TX

Streets/Roads

Alleyway
Replacement












1,000,000


8

Winnsboro

TX

Streets/Roads

Bicycle
/
Walking
Trail












1,000,000


10

Winnsboro

TX

Streets/Roads

Transplant
Overhead
Powerlines
to
Underground












4,000,000


15

Winnsboro

TX

Transit

County
Wide
Public
Transit
System












5,000,000


10

Winnsboro

TX

Transit

Rail
Spur
Restora3on
to
Industrial
Land












2,000,000


60














300,000


5

City

State

Program

Winnsboro

TX

Water

Extend
Waterlines
City
Wide

Project
Descrip3on

Funding
Required 












350,000


Brigham
City

UT

Airport

Airport
Taxiway

Brigham
City

UT

CDBG

400
N.
Bridge
Replacement














400,000


2

Brigham
City

UT

CDBG

200
S.
Traffic
Calming














200,000


10

Brigham
City

UT

CDBG

Compost
Facility
Transfer
Sta3on
&
Recycling
Center










24,000,000


18

Brigham
City

UT

CDBG

Sports
Park










15,000,000


33

Brigham
City

UT

CDBG

City
Hall
&
Public
Safety
Building










15,000,000


34

Brigham
City

UT

CDBG

Academy
Square
Project










20,000,000


42

Brigham
City

UT

CDBG

Comple3on
of
an
open‐access
fiber
op3c
telecommunica3on
network
in
partnership
with
15
other
Utah
citeis.












5,982,685


119

Brigham
City

UT

Streets/Roads

Main
Street
Sidewalk
Rehavilita3on
&
Irriga3on
project
(downtown)














700,000


10

Brigham
City

UT

Streets/Roads

Sidewalks
en3re
town












4,700,000


26

Brigham
City

UT

Streets/Roads

1200
W.
Forest
to
1100
S.












8,300,000


27

Brigham
City

UT

Transit

Trail
System












2,800,000


20

Brigham
City

UT

Water

Waste
Treatment
Plant
Telemetry
Upgrade














240,000


4

Brigham
City

UT

Water

Waterline
‐
1200
W.
6
N.
to
Forest
St.














550,000


6

Brigham
City

UT

Water

2
million
gallon
north
end
concrete
water
storage
reservoir












2,200,000


8

Brigham
City

UT

Water

Piping
Cement
Ditch
‐
Mantua
Reservoir












3,100,000


14

Brigham
City

UT

Water

Water
Radio
Read
Meters,
Service
Replacement,
Security
&
Telemetry












2,600,000


19

Herriman

UT

CDBG

REMEDIATION
OF
CONTAMINATED
SOIL












2,500,000


18

Herriman

UT

Energy

New
City
Hall










12,000,000


100

Herriman

UT

Streets/Roads

6000
WEST
WIDENING












1,300,000


12

Herriman

UT

Streets/Roads

MIDAS
CREEK
BRIDGE














750,000


12

Herriman

UT

Streets/Roads

5600
WEST
PROJECT












2,500,000


20

Herriman

UT

Streets/Roads

13400
SOUTH
WIDENING












2,000,000


25

Herriman

UT

Streets/Roads

HERRIMAN
PARKWAY
EXTENSION












4,000,000


32

Herriman

UT

Streets/Roads

SOUTH
HILLS
BOULEVARD












5,000,000


35

Herriman

UT

Water

REGIONAL
DETENTION
POND














800,000


10

Herriman

UT

Water

MAIN
STREET
WATERLINE
&
PUMP
STATION












2,000,000


16

Herriman

UT

Water

PRESSURIZED
IRRIGATION
PIPELINE












3,500,000


18

Herriman

UT

Water

16"
WATERLINE
TO
TANK












1,800,000


20

Herriman

UT

Water

5
MILLION
GALLON
WATER
TANK












4,500,000


34

Holladay

UT

CDBG

Midblock
Roadway
‐
Holladay
Village
Commercial
Area
Development.














890,000


17

Holladay

UT

Energy














125,000


3

Holladay

UT

Streets/Roads

"Cofonwood
Loop"
Street
Ligh3ng
Upgrade
‐
Replace
approx
120
incandescent
street
light
fixtures
on
 an3quated
series
loop
with
new
LED
fixtures. Kentucky
Avenue
and
Holladay
Blvd.
Intersec3on
Reallignment














300,000


10

Holladay

UT

Streets/Roads












1,500,000


15

Holladay

UT

Streets/Roads

Holladay
Village
(downtown)
Roadway
Reconstruc3on
Supplemental
Funding
to
complete
project.

Work
 inlcudes
roadway
reconstructoin,
powerline
buriel,
soils
contamina3on
mi3ga3on,
streetscape,
and
other
 incidentals. city‐wide
streets
‐
pavement
rehabilita3on












5,000,000


35

Holladay

UT

Water

Wren
Hollow
Flood
Control
/
Storm
Drain
Project
















85,000


1

Holladay

UT

Water

Wayman
Storm
Drain
Phase
II
‐
Casto
Lane
Extension
/
Irriga3on
Separa3on














400,000


4

Holladay

UT

Water

Upper
Canal
Regional
Flood
Control
Facili3es
‐
Bank
Stabiliza3on
‐
Flood
control
structures,
and
related
work














550,000


5

Holladay

UT

Water

Indian
Rock
Storm
Drain
/
Irriga3on
Separa3on














700,000


7

Murray

UT

CDBG

4800
South
Street
improvements
















33,000


5

Murray

UT

CDBG

Storm
Sewer
project
at
5490
S.
Vine
Street
















56,100


5

Murray

UT

CDBG

Edison
Street
Improvements














225,000


10

Murray

UT

CDBG

Sewer
line
replacement
on
300
West
from
4650
South
to
4500
South














250,000


10

Murray

UT

CDBG

Sewer
line
replacement
on
Edison
St.
from
State
to
Main
Street














153,000


10

Murray

UT

CDBG

Storm
Sewer
project
on
Fairbourne
Avenue














194,000


10

Murray

UT

CDBG

Water
line
improvements
on
Alpine
Dr.
from
5300
South
to
Knollcrest
Dr.














196,290


10

Murray

UT

CDBG

Water
line
improvements
on
Avalon
Dr.
from
5300
South
to
5600
South














349,650


10

Murray

UT

CDBG

Water
line
improvements
on
Edison
St.
from
State
St.
to
Main
St.














158,000


10

Murray

UT

CDBG

Water
line
improvements
on
Fireclay
Ave.
from
State
St.
to
Main
St.














172,000


10

Murray

UT

CDBG

Water
line
improvements
on
Kenwood
Dr.
Avalon
to
Avalon














265,000


10

Murray

UT

CDBG

Water
line
improvements
on
Montrose
from
5300
South
to
Alpine
Dr.














119,205


10

Murray

UT

Energy














500,000


3

Murray

UT

Streets/Roads

Landfill
gas
project
with
TransJordan
Landfill
to
produce
between
4
to
7
megawafs
of
power
as
a
24/7
green
 resource.

Infrastructure
to
provide
power
to
the
grid
and
to
city
power
department
for
distribu3on. 4800
South












1,605,450


10

Murray

UT

Streets/Roads

5900
South












3,675,488


20

Murray

UT

Water

State
Street
Sewer
Line














875,000


20

Murray

UT

Water

State
Street
Waterline












1,726,775


20

Orem

UT

CDBG

Timpanogos
Park
Facility
Improvements














800,000


25

Orem

UT

CDBG

Public
Facili3es
‐
Educa3on
Resources
Building












1,200,000


40

Orem

UT

CDBG

Business
Incubator












2,000,000


50

Orem

UT

CDBG

Curb,
Gufer
&
Sidewalk
Improvements














600,000


60

Orem

UT

CDBG

ED‐
For‐Profit/Job
Crea3on












2,500,000


70

Orem

UT

CDBG

City
Center
Infrastructure
Improvements












9,400,000


165

Orem

UT

CDBG

Library
Infrastructure
Improvements












9,000,000


275

Orem

UT

CDBG

Community
Telecommunica3ons
System










40,000,000


400












1,500,000


Jobs 4 12

City

State

Program

Orem

UT

Public
Safety

Orem

UT

Streets/Roads

Install
cameras
‐‐
72
cameras
installed,
one
per
intersec3on,
between
500
West
to
200
East
and
200
North
to
 600
South.

$10,000
per
camera
includes
installa3on,
maintenance.

7
officers
to
operate. Fiber
Op3c
Installa3on

Project
Descrip3on

Funding
Required

Jobs

Orem

UT

Streets/Roads

Intersec3on
Improvements
at
University
Parkway
&
800
East














350,000


75

Orem

UT

Streets/Roads

Add
Right‐turn
Lanes
at
400
South
&
Orem
Boulevard














450,000


100

Orem

UT

Streets/Roads

Add
Right‐turn
Lanes
at
800
South
&
Orem
Boulevard














950,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
1200
North
&
1200
West














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
1200
North
&
800
West














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
400
South
&
400
East














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
400
South
&
400
West














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
800
North
&
200
East














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
800
North
&
600
East














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
800
North
&
600
West














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
at
800
East
&
1200
North














500,000


100

Orem

UT

Streets/Roads

New
Traffic
Signal
at
800
East
&
400
North














500,000


100

Orem

UT

Streets/Roads

Roundabout
at
2000
South
&
Columbia
Lane














500,000


100

Orem

UT

Streets/Roads

Widen
400
South
from
Orem
Boulevard
to
State
Street














750,000


100

Orem

UT

Streets/Roads

Widen
800
South
from
Orem
Boulevard
to
State
Street














950,000


100

Orem

UT

Streets/Roads

Carterville
Road/West
Union
Canal
Trail












2,000,000


150

Orem

UT

Streets/Roads

ATMs
Improvements












1,500,000


200

Orem

UT

Streets/Roads

Center
Street,
I‐15
to
Geneva
Road
Widening
Project












3,000,000


200

Orem

UT

Streets/Roads

North
Union
Canal
Trail












7,000,000


250

Orem

UT

Streets/Roads

Reconstruct
and
Improve
400
South,
1000
West
to
Geneva
Road












4,500,000


300

Orem

UT

Streets/Roads

Sidewalk
Construc3on
Project












2,800,000


300

Orem

UT

Streets/Roads

Street
Resurfacing
Project












3,300,000


300

Orem

UT

Streets/Roads

Widen
1200
West,
900
North
to
1600
North












4,000,000


300

Orem

UT

Streets/Roads

Widen
400
West
from
400
North
to
800
North












4,500,000


300

Orem

UT

Streets/Roads

Widen
800
West,
400
North
to
Center
Street












4,500,000


300

Orem

UT

Streets/Roads

Local
Street
Widening
Projects












5,000,000


500

Orem

UT

Streets/Roads

Widen
400
South,
I‐15
to
Geneva
Road










10,000,000


500

Orem

UT

Water

Orem

UT

Water

Sep3c
Elimina3on
Program














500,000


25

Orem

UT

Water

Penstock
Secondary
Water
Line
Replacement














250,000


50

Orem

UT

Water

Carterville
Pressure
Sewer














500,000


100

Orem

UT

Water

Carterville
Road
Sewer
Project














500,000


100

Orem

UT

Water

Cascade
Spring
Line
Replacement














600,000


100

Orem

UT

Water

Main
Street,
1430
North
to
1600
North
Storm
Drain














500,000


100

Orem

UT

Water

Water
Meter
Replacement
Program












5,000,000


100

Orem

UT

Water

Water
Reclama3on
Facility
Expansion










15,000,000


150

Orem

UT

Water

2000
South/Geneva
Road
Water
Reuse
Project












4,000,000


200

Orem

UT

Water

400
North,
Main
Street
to
800
East
Storm
Drain












1,500,000


200

Orem

UT

Water

SCERA
Park
Storm
Drain,
400
East
to
State
Street












1,500,000


200

Orem

UT

Water

Waste
Water
Collec3on
Facility
Project














700,000


200

Orem

UT

Water

1200
North
Storm
Sewer,
400
East
to
1400
West












4,500,000


300

Orem

UT

Water

2000
South/Geneva
Road
Sewer
Project












1,500,000


300

Orem

UT

Water

2000
South/Geneva
Road
Water
Project












1,500,000


300

Orem

UT

Water

2000
South/Taylor
Storm
Drain
Area
Improvement












3,500,000


300

Orem

UT

Water

5
MG
Water
Tank












5,000,000


300

Orem

UT

Water

Lindon
Hollow
Drainage
Ouzall












3,500,000


300

Orem

UT

Water

Williams
Farm
Deten3on
Basin












3,500,000


300

Orem

UT

Water

4"
Waterline
Replacement
Project












7,900,000


500

Orem

UT

Water

Alta
Spring
Line
Restora3on












6,000,000


500

Provo

UT

Airport

Drainge
Improvements
at
Provo
Municipal












1,000,000


3

Provo

UT

Airport

Ligh3ng
and
Fencing
Upgrades












2,500,000


15

Provo

UT

Airport

New
airport
ramp












4,000,000


25

Provo

UT

CDBG

100
North
street‐sidewalk‐street
tree‐street
light
improvements
in
the
CBD














250,000


2

Provo

UT

CDBG

Harmon
Park
Improvements














150,000


2

Provo

UT

CDBG

Pioneer
Park
water
feature














650,000


2

Provo

UT

CDBG

North
Park/Pioneer
Museum
Parking
Lot














150,000


4

Provo

UT

CDBG

Center
Street
sprinkling
system
rehabilita3on














300,000


5

Provo

UT

CDBG

Exchange
Park
Improvements














200,000


5

Provo

UT

CDBG

Joaquin
Park
improvements














800,000


5

Provo

UT

CDBG

New
community
center
for
the
Boulders/Franklin
South
neighborhood














400,000


5

Provo

UT

CDBG

North
Park/Timp
Ball
Park
Reconstruc3on














300,000


5

Provo

UT

CDBG

Paul
Reams
Wilderness
Park
Improvements














350,000


5

Provo

UT

CDBG

Riverside
Park
Improvements














200,000


5

Provo

UT

CDBG

Sidewalk
replacement
in
Pioneer
Neighborhoods












2,000,000


12

Provo

UT

CDBG

Downtown
Parking
Infrastructure












1,800,000


25

Provo

UT

CDBG

Addi3onal
Mountain
Vista
Business
Park
Infrastructure












2,500,000


30

Provo

UT

CDBG

Reconstruct
broken‐down
concrete
planters
on
Center
Street
in
the
CBD












2,500,000


30












1,216,000


7














300,000


50

City

State

Program

Provo

UT

CDBG

New
community
recrea3on
center

Project
Descrip3on

Funding
Required Jobs 








25,000,000
 40

Provo

UT

Energy

Methane
Capture
at
SUVSWD
Landfil












1,800,000


12

Provo

UT

Housing

Energy
Upgrades
for
Housing
Authority
Owned
Proper3es












1,000,000


80

Provo

UT

Public
Safety

Police
department
indoor
gun
range
with
noise
afenua3on

Provo

UT

Streets/Roads

Provo

UT

Provo

UT

Provo














663,500


11

Par3al
funding
for
200
West
railroad
underpass










20,000,000


120

Transit

Railroad
Quiet
Zone
Improvements












1,250,000


8

Water

Crea3on
of
Westside
Pressure
Zone
‐
Install
PRV
Sta3ons














825,000


2

UT

Water

8"
Force
Main
from
West
Center
St.
Lib
Sta3on
to
Gravity
Sewer














275,600


3

Provo

UT

Water

2550
West
Sewer
Interceptor














480,444


4

Provo

UT

Water

Camelot
Sewer
Line














216,000


4

Provo

UT

Water

Southeast
Reservoir
Drain
Line














135,000


4

Provo

UT

Water

Automa3c
Meter
Reading
Infrastructure












4,275,000


5

Provo

UT

Water

West
Center
Street
Sewer
Lib
Sta3on














500,000


5

Provo

UT

Water

10"
Gravity
Sewer
Lines
to
West
Center
Street
Lib
Sta3on












1,010,800


7

Provo

UT

Water

Water
Maintenance
Facility
Repairs,
Efficiency
Upgrade
&
Solar
Roof












1,250,000


7

Provo

UT

Water

Rock
Canyon
Well
and
Pump
House

Provo

UT

Water

Provo

UT

Provo

UT

Provo














700,000


8

Solids
Handling
Facility
Upgrade
‐
Wastewater
Treatment
Plant












2,000,000


12

Water

New
5
MG
Water
Reservoir












5,500,000


17

Water

New
trunk
line
from
Wastewater
Treatment
Plant
across
I‐15










10,000,000


25

UT

Water

48"
Aqueduct
from
Mouth
of
Provo
Canyon
to
Main
Reservoirs










10,381,000


28

Salem

UT

CDBG

Industrial
Park












5,000,000


50

Salem

UT

CDBG

Recrea3on
Complex










20,000,000


200

Salem

UT

Streets/Roads

Local
Road
Improvements












5,000,000


50

Salem

UT

Water

Storm
Drain
System










15,000,000


150

Salem

UT

Water

Regional
Wastewater
Transmission
Line










50,000,000


500

Salem

UT

Water

Regional
Wastewater
Treatment
Plant








250,000,000


1250

Salt
Lake
City

UT

CDBG

Facili3es
capital
project
design,
engineering,
feasibility
and
development












1,000,000


3

Salt
Lake
City

UT

CDBG

Resurfacing
of
streets
and
installa3on
of
bicycle
lanes














100,000


5

Salt
Lake
City

UT

CDBG

Construct
Jordan
River
Trail
crossing
of
Interstate‐80














450,000


10

Salt
Lake
City

UT

CDBG

Jordan
Meadows
Park
Construc3on














700,000


10

Salt
Lake
City

UT

CDBG

Replace
and
expand
downtown
wayfinding
signing
system














400,000


10

Salt
Lake
City

UT

CDBG

New
Soccer
Field
1700
South
Jordan
River
Park














300,000


15

Salt
Lake
City

UT

CDBG

ADA
sidewalk
ramp
construc3on












1,500,000


20

Salt
Lake
City

UT

CDBG

Baseball
diamond
viewing
stands
and
concession
both
upgrades














700,000


20

Salt
Lake
City

UT

CDBG

Construct
Jordan
River
Trail
between
Redwood
Road
and
north
city
limits












1,300,000


20

Salt
Lake
City

UT

CDBG

Construct
Jordan
River
Trail
Crossing
of
Union
Pacific
Railroad
mainline












1,500,000


20

Salt
Lake
City

UT

CDBG

Construct
Surplus
Canal
Bicycle
and
Pedestrian
Trail














750,000


20

Salt
Lake
City

UT

CDBG

Park
baseball
diamonds,
stand
and
concession
improvements
2
parks














700,000


20

Salt
Lake
City

UT

CDBG

Park
restroom
improvement
projects‐Redwood
and
1700
South
Street
parks;
Rosewood
Park
Restroom












1,000,000


20

Salt
Lake
City

UT

CDBG














900,000


25

Salt
Lake
City

UT

CDBG

Park
stairways,
sidewalks
and
ADA
access
and
playgrounds
improvements
‐
4th
Avenue
stairs,
Rosewood
Park,
 Reservoir
Park,
Shipp
Park
and
Jordan
Meadows
Community
Park Rotary
Glen
Park
Improvements
and
Restrooms












1,300,000


25

Salt
Lake
City

UT

CDBG

2007/2008
Residen3al
streets
reconstruc3on‐not
constructed‐
6
streets
(1.74
lane
miles)












1,600,000


30

Salt
Lake
City

UT

CDBG

2008/2009
Residen3al
street
reconstruc3on
Project‐
7
streets
(1.87
lane
miles)












1,700,000


30

Salt
Lake
City

UT

CDBG

2009/2010
Residen3al
street
reconstruc3on
Project–
7
streets
(1.87
lane
miles)












1,700,000


30

Salt
Lake
City

UT

CDBG

Construct
North
Temple
Bicycle
and
Pedestrian
Trail












2,000,000


30

Salt
Lake
City

UT

CDBG

Deteriorated
Sidewalk
Replacement












2,000,000


35

Salt
Lake
City

UT

CDBG

Jordan
River
trail
ligh3ng
and
construc3on
‐
5
projects












1,900,000


40

Salt
Lake
City

UT

CDBG

ADA
Playground
Upgrade
‐
3
parks














600,000


45

Salt
Lake
City

UT

CDBG

Park
irriga3on
system
upgrades
‐
3
parks












1,000,000


45

Salt
Lake
City

UT

CDBG

Construct
Folsom
Avenue
Bicycle
and
Pedestrian
Trail
&
linear
park












6,000,000


50

Salt
Lake
City

UT

CDBG

Construct
900
South
Bicycle
and
Pedestrian
Trail
&
linear
park












8,500,000


60

Salt
Lake
City

UT

CDBG

Capital
asset
renewal
on
City
facili3es










75,000,000


75

Salt
Lake
City

UT

CDBG

Refugee
Welcome
Housing
‐
crea3on
of
175
housing
units
for
refugee
popula3on
in
Salt
Lake
City










27,255,000


145

Salt
Lake
City

UT

CDBG

City
wide
asphalt
pavement
overlays

‐
18
streets












3,000,000


230

Salt
Lake
City

UT

CDBG

Pavement
Overlays
&
Street
Preserva3on

‐
18
streets












3,000,000


230

Salt
Lake
City

UT

Energy

Glass
recycling
capital
investment












5,000,000


5

Salt
Lake
City

UT

Energy

Fuel
Cell
Co‐Genera3on
‐
Library/City
&
County
Boiler
Room










10,000,000


10

Salt
Lake
City

UT

Energy

Grant
program
for
residen3al
energy
efficiency
projects












1,000,000


10

Salt
Lake
City

UT

Energy

Solar
Hot
Water
and
2MW
Photovoltaic
Project
‐










10,000,000


10

Salt
Lake
City

UT

Energy

ESCO
Energy
Conserva3on
Projects
‐
All
City
&
County
Buildings










30,000,000


30

Salt
Lake
City

UT

Energy












5,200,000


61

Salt
Lake
City

UT

Energy

John
W.
Gallivan
Utah
Center
Renova3on
‐construc3on
of
a
LEED
cer3fied
building
for
restrooms
and
rental
 facili3es,
replacing
expansion
joints,
repairing
surface
and
subsurface
drainage
system,
expansion
of
the
 amphitheater
sea3ng
area,
and
an
enlarg 20
MW
Geothermal
Power
Genera3on
Plant










70,000,000


70

Salt
Lake
City

UT

Housing

Projects
UT004‐02
&
001
‐
City
Plaza,
Phillips
Plaza,
and
Romney
Plaza
(Public
Housing
Remodeling)














374,000


20

Salt
Lake
City

UT

Housing

New
Construc3on
‐
Rendon
Terrace,
158
North
600
West
(Public
Housing)












5,056,000


22

Salt
Lake
City

UT

Public
Safety

CBRN
suit
for
each
employee












1,000,000


0

Salt
Lake
City

UT

Public
Safety

Constant
man
‐
minimum
staffing;
over3me
funding
to
call
individuals
to
work;
ongoing
budget
item














130,000


0

Salt
Lake
City

UT

Public
Safety

In‐car
video
system
for
each
patrol
vehicle,
includes
installa3on














750,000


0

Salt
Lake
City

UT

Public
Safety

Man
portable
and
EOD
response
robot.














115,000


0

City

State

Program

Salt
Lake
City

UT

Public
Safety

Night
vision
and
thermal
imaging
units

Project
Descrip3on

Funding
Required 












120,000


Jobs

Salt
Lake
City

UT

Public
Safety

Prisoner
transport
seats
to
be
placed
in
patrol
vehicle














100,000


0

Salt
Lake
City

UT

Public
Safety

Aerial
surveillance
drone
to
monitor
crowd
and
event
situa3ons;
1
officer
and
equipment














200,000


1

Salt
Lake
City

UT

Public
Safety














150,000


1

Salt
Lake
City

UT

Public
Safety
















80,000


1

Salt
Lake
City

UT

Public
Safety














173,000


1

Salt
Lake
City

UT

Public
Safety

Facial
recogni3on
on
UTA
buses,
TRAX
sta3ons
and
terminals.

100
cameras,
including
installa3on,
 maintenance
and
monitoring. Purchase
of
air
card
for
all
officers,
include
setup
and
maintenance
to
access
cri3cal
infrastructure
informa3on,
 receive
immediate
updates,
and
ease
communica3on
during
emergency
situa3ons. Salt
Lake
Informa3on
Center
(SLIC)
response
vehicle
equipped
with
vehicle‐based
PC,
monitors
and
other
 equipment Automa3c
Vehicle
Locator
System
for
Fire
Sta3on
14
















90,689


2

Salt
Lake
City

UT

Public
Safety

Crime
Preven3on
Through
Environmental
Design
(CPTED);
2
officers
with
vehicles














286,000


2

Salt
Lake
City

UT

Public
Safety

DNA
tes3ng.
$4,000
per
test
and
2
civilian
employees
to
manage.














200,000


2

Salt
Lake
City

UT

Public
Safety

License
plate
reader
cars
to
look
for
stolen
cars;
2
vehicles
@
$45,000
each
and
2
officers.














256,000


2

Salt
Lake
City

UT

Public
Safety














836,000


2

Salt
Lake
City

UT

Public
Safety














214,000


3

Salt
Lake
City

UT

Public
Safety














279,000


3

Salt
Lake
City

UT

Public
Safety

Sobware
program
to
search,
manage
and
analyze
vast
amounts
of
criminal
inves3ga3on
informa3on
from
wide
 ranging
data
sources.

Include
sobware
program,
server,
IT
support
and
2
officers. Mo3on
tracking
sobware;

camera
sensors
to
no3fy
monitoring
employees
of
suspicious
ac3vi3es.

Include
3
 officers. SPIDR.

Use
of
spherical
camera
to
record
cri3cal
infrastructure.

Informa3on
to
be
available
to
all
officers
in
 3mes
of
hostage
crisis,
barricade,
etc.

Available
via
VPN,
air
card.

2
officers
and
1
sergeant
to
implement,
 record
and
manage. Prisoner
transport
van;
vehicle
and
4
officers














452,000


4

Salt
Lake
City

UT

Public
Safety

Traffic
Control
Systems
for
Emergency
Response














400,000


4

Salt
Lake
City

UT

Public
Safety

Dedicated
DUI
squad;
1
sergeant
and
6
officers














950,000


7

Salt
Lake
City

UT

Public
Safety

Fire
Sta3on
15
‐
new
fire
sta3on
for
Southwest
Quadrant
of
SLC












2,600,000


20

Salt
Lake
City

UT

Public
Safety

Increase
bike
patrol
in
area.

Add
4
squads,
6
officers
and
1
sergeant
per
squad.












1,964,000


28

Salt
Lake
City

UT

Public
Safety

Increase
foot
patrol
in
area.

Add
4
squads,
6
officers
and
1
sergeant
per
squad.












1,964,000


28

Salt
Lake
City

UT

Public
Safety

Fire
Training
Center
and
rebuild
Fire
Sta3on
14












9,961,000


30

Salt
Lake
City

UT

Streets/Roads

600
East
600
South
‐
new
traffic
signal














160,000


3

Salt
Lake
City

UT

Streets/Roads

3400
West
California
Ave
and
3800
West
California
Ave
‐
new
traffic
signals














320,000


6

Salt
Lake
City

UT

Streets/Roads

700
East
‐
S.
Temple
to
700
South
‐
replace
street
ligh3ng














600,000


8

Salt
Lake
City

UT

Streets/Roads

Concrete
Pavement
Rehabilita3on
2008/2009
Project
‐
candidates
not
iden3fied














500,000


10

Salt
Lake
City

UT

Streets/Roads

Concrete
Pavement
Rehabilita3on
2009/2010
Project
‐
candidates
not
iden3fied














500,000


10

Salt
Lake
City

UT

Streets/Roads

Concrete
Pavement
Rehabilita3on
Project
‐
Previous
not
constructed
9
streets
(3.8
LM)














500,000


10

Salt
Lake
City

UT

Streets/Roads

Install
remote
control
system
for
Sugar
House
street
ligh3ng
system














350,000


10

Salt
Lake
City

UT

Streets/Roads

2009/2010
Pavement
Overlay
and
Preserva3on
–
9
streets
(7.06
L.M.)












1,500,000


15

Salt
Lake
City

UT

Streets/Roads

Replace
North
Temple
Street
Ligh3ng
system












2,000,000


15

Salt
Lake
City

UT

Streets/Roads

Street
Pavement
Overlay
Project
‐
Previous
streets
not
overlayed
‐
11
streets
(7.27
lane
miles)












1,500,000


15

Salt
Lake
City

UT

Streets/Roads

Install
new
HAWK
Pedestrian
crossing
signals














800,000


20

Salt
Lake
City

UT

Streets/Roads

Install/Replace
Traffic
Signal
Detec3on
at
200
intersec3ons














800,000


20

Salt
Lake
City

UT

Streets/Roads

Replace
40+
year
street
lights
citywide
using
more
efficient
lights














800,000


20

Salt
Lake
City

UT

Streets/Roads

Replace
the
City's
Traffic
Control
Center
Computer
Map














500,000


20

Salt
Lake
City

UT

Streets/Roads

2008/2009
Local
Streets
Reconstruc3on
Project
‐
7
streets
(1.87
lane
miles)












1,700,000


30

Salt
Lake
City

UT

Streets/Roads

2009/2010
Local
Streets
Reconstruc3on
Project
‐
7
streets
(1.87
lane
miles)












1,700,000


30

Salt
Lake
City

UT

Streets/Roads

Intersec3on
traffic
signal
upgrades
‐
14
intersec3ons












2,240,000


30

Salt
Lake
City

UT

Streets/Roads

Previous
Local
Streets
Reconstruc3on
not
constructed
‐
6
streets
(1.74
L.M.)












1,600,000


30

Salt
Lake
City

UT

Streets/Roads

500
East
Reconstruc3on
from
1300
South
to
2100
South












2,800,000


45

Salt
Lake
City

UT

Transit

Construct
paved
track‐way
on
Airport
Light
Rail
project












8,000,000


15

Salt
Lake
City

UT

Transit

Construct
the
Sugar
House
Streetcar
line
connec3ng
downtown
Sugar
House
to
the
regional
light
rail
system










55,000,000


100

Salt
Lake
City

UT

Transit








100,000,000


100

Salt
Lake
City

UT

Transit








175,000,000


150

Salt
Lake
City

UT

Transit










65,000,000


180

Salt
Lake
City

UT

Water

Construc3on
of
a
new
streetcar
line
in
southwest
downtown
connec3ng
the
intermodal
transporta3on
center
 with
major
des3na3ons
including
a
regional
park,
providing
an
underpass
for
the
streetcar
and
major
trail
 under
the
Union
Pacific
Railroad
mainlin Construct

two
light
rail
extensions
downtown
(400
South
extension
to
Hub
and
700
South/400
West
 extension)
to
complete
the
adopted
Downtown
Transporta3on
Master
Plan
light
rail
system Construc3on
of
a
new
light
rail
North
Temple
viaduct
over
Union
Pacific
and
UTA
Commuter
rail
tracks
 including
new
roadway
improvements,
pedestrian
walks
with
security
ligh3ng
and
a
passenger
transfer
sta3on
 between
the
presently
being
constructed
Airp Big
Cofonwood
Water
Treatment
Plant
‐
Filter
Valve
Rehab














250,000


1

Salt
Lake
City

UT

Water

Parleys
Water
Treatment
Plant
‐
Intake
Structure
Rehab














250,000


1

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Iron
Sponge














350,000


2

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Lab
Roof
and
HVAC
Replacement














350,000


2

Salt
Lake
City

UT

Water

Water
Administra3on
Facility
&
Energy
Efficiently
Upgrade














750,000


4

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Clarifier
Weir
and
Baffle
Reconstruc3on














750,000


4

Salt
Lake
City

UT

Water

Big
Cofonwood
Water
Treatment
Plant
‐
Computer
Control
Upgrade
&
Maintenance
Program
Upgrade














350,000


6

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Secondary
Clarifier
Weir
and
Baffle
Rehab












1,250,000


7

Salt
Lake
City

UT

Water

North
Bench
Booster
Pump
Sta3on
Rehabilita3on












1,500,000


8

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Odor
Control
Facility
Rehabilita3on












1,500,000


8

Salt
Lake
City

UT

Water

Creek
Road
Water
Main
Upgrade












1,700,000


9

Salt
Lake
City

UT

Water

48"
Sewer
Main
Corrosion
Rehabilita3on












2,000,000


11

Salt
Lake
City

UT

Water

Water
Distribu3on
System
Replacements












3,500,000


19

Salt
Lake
City

UT

Water

Cofonwood
Park
irriga3on
system
upgrade














500,000


20

Salt
Lake
City

UT

Water

City
Creek
Water
Treatment
Plant
‐
Phase
2
Seismic
Upgrade












6,000,000


33

Salt
Lake
City

UT

Water

Water
Reclama3on
Plant
‐
Digester
Cover
Rehab












6,000,000


33

0

City

State

Program

Salt
Lake
City

UT

Water

Water
Maintenance
Facility
Repairs,
Efficiency
Upgrade
&
Solar
Roof

Project
Descrip3on

Funding
Required 










3,500,000


Jobs 35

Salt
Lake
City

UT

Water

Salt
Lake
City

UT

Water

Big
Cofonwood
Water
Treatment
Plant
‐
Floccula3on
System
rehab
and
structural/seismic
rehabilita3on












8,000,000


40

Water
Reclama3on
Plant
‐
Phase
1
Plant
SCADA
Control
and
Electrical
Update












1,500,000


Salt
Lake
City

UT

Water

60

Water
Reclama3on
Plant
‐
Construc3on
Alterna3ve
Disinfec3on
system
to
replace
chlorine
gas
system
for
 public
and
operator
safety

Sandy
City

UT

Streets/Roads










13,000,000


66

Sandy
City

UT

Streets/Roads










17,000,000


150

Public
Safety

Reconstruc3on
of
1300
East
which
is
a
major
commuter
corridor
to
communi3es
from
Draper
City
to
the
south
 to
Salt
Lake
City
to
the
north.

Daily
traffic
es3mates
are
45,000
vehicles
per
day.

The
project
is
funded
from
 7800
South
to
10200
South
and
bid New
6200
South
2700
West
Fire
Sta3on

Taylorsville

UT












4,500,000


Taylorsville

40

UT

Public
Safety

New
Police
Evidence
Warehouse












1,000,000


75

Taylorsville

UT

Public
Safety

Arts
/
Jus3ce
Center










10,000,000


100

Taylorsville

UT

Streets/Roads












1,250,000


17

Taylorsville

UT

Streets/Roads












1,500,000


20

Taylorsville

UT

Streets/Roads












1,500,000


20

Taylorsville

UT

Streets/Roads










18,000,000


100

Taylorsville

UT

Water














110,000


4

Taylorsville

UT

Water

Bonnie
Brook
Roadway
Reconstruc3on
–
0.50
miles
of
roadway
reconstruc3on
of
failed
roadway,
deteriorated
 curb,
gufer
and
sidewalk. 1175
West
Roadway
Reconstruc3on
–
0.5
miles
of
roadway
reconstruc3on
to
include
widening,
traffic
calming
 features,
new
curb
&
gufer,
irriga3on
line
reloca3on. 1300
West
Trail
–
2.2
miles
of
roadway
widening
to
include
bicycle
paths,
new
curb,
gufer
and
sidewalk,
and
 storm
water
control Redwood
Road
Business
District
Enhancement
‐
3.5
miles
of
roadway
reconstruc3on
to
help
alleviate
traffic
 conges3on,
improve
traffic
and
pedestrian
safety,
increase
business
access
to
aid
economic
development,
 reduce
blight
and
enhance
beau3fica3on. 2600
West
4220
South
Storm
Drain
–
Installa3on
of
new
storm
drain
infrastructure
to
bypass
exis3ng
irriga3on
 facili3es 3200
West
5650
South
Storm
Drain
–
Replacement
of
exis3ng
18”
storm
pipe
with
a
27”
pipe














130,000


4

Taylorsville

UT

Water

4375
South
1350
West
Storm
Drain
–
Replacement
of
a
failing
36”
storm
drain
pipe














120,000


4

Taylorsville

UT

Water

Con3nental
drive
Storm
Drain
–
Replacement
of
failing
15”
storm
drain
pipe














190,000


4

Taylorsville

UT

Water














320,000


6

Taylorsville

UT

Water

3600
West
4850
South
Storm
Drain
–
Installa3on
of
new
storm
drain
infrastructure
to
bypass
exis3ng
irriga3on
 facili3es 6200
South
3650
West
Storm
Drain
–
36”
storm
drain
pipe
replacement














300,000


6

Taylorsville

UT

Water

Bennion
Road
Storm
Drain
–
Installa3on
of
27”
storm
drain
pipe














360,000


6

Taylorsville

UT

Water

Inlet
Box
Replacement
–
Replacement
of
30
deteriorated
inlet
boxes














250,000


6

Taylorsville

UT

Water

1300
West
4505
South
Storm
Drain
–
Replacement
of
deteriorated
36”
storm
drain
pipe














440,000


10

Taylorsville

UT

Water

1950
West
Storm
Drain
–
Installa3on
of
new
24”
storm
drain
pipe














470,000


10

Taylorsville

UT

Water

1300
west
Winchester
Storm
Drain
–
1
mile
of
27”
storm
drain
pipe,
including
curb
and
gufer














610,000


12

Taylorsville

UT

Water

1300
West
4375
South
Storm
Drain
–
Replacement
of
an
exis3ng
36”
storm
drain
pipe
with
a
48”
pipe














650,000


13

Taylorsville

UT

Water

1250
West
Storm
Drain
–
1
mile
of
24”
storm
drain
pipe
including
new
curb
and
gufer














680,000


14

Taylorsville

UT

Water

3200
West
5000
South
Storm
Drain
–
1500’
of
new
24”
storm
drain
pipe














930,000


18

Taylorsville

UT

Water

2200
West
4200
South
Storm
Drain
–
1
mile
of
48”
storm
drain
pipe
to
alleviate
flooding












1,250,000


20

West
Jordan

UT

CDBG

Ron
Woods
Baseball
Complex
Phase
II
will
complete
the
baseball
complex
in
the
Western
sec3on
of
the
City.












3,000,000


85

West
Jordan

UT

Energy

Comple3on
of
the
Supervisory
Control
&
Data
Acquisi3on
System
for
the
West
Jordan
water
system.














550,000


30

West
Jordan

UT

Energy














250,000


30

West
Jordan

UT

Public
Safety














350,000


15

West
Jordan

UT

Public
Safety












3,500,000


250

West
Jordan

UT

Streets/Roads










19,000,000


230

West
Jordan

UT

Streets/Roads












5,000,000


230

West
Jordan

UT

Water












1,000,000


85

West
Jordan

UT

Water

Solar
ligh3ng
system
for
the
West
Jordan
Public
works
complex.

This
project
will
provide
a
25
KW
solar
ligh3ng
 system. 39
In‐Car
Digital
Camera
Systems
 70
Spillman
Mobile
Communica3on
Systems
 Construc3on
of
a
Police
Substa3on/Fire
Sta3on
to
serve
the
Western
por3on
of
West
Jordan.

This
area
has
 experienced
the
highest
rate
of
development
in
the
last
10
years. 5600
West
Road
Project
will
add
two
traffic
lanes
and
a
turn
lane
in
the
construc3on
of
a
5
lane
road.

The
 project
will
allow
for
the
loca3on
of
a
new
Home
Depot
and
Albertson
Grocery
Store
crea3ng
permanent
jobs. 7800
South
Road
project
will
add
two
traffic
lanes
and
a
turn
lane
for
a
new
5‐lane
road.

The
project
will
 connect
with
the
5600
West
Road
project
to
allow
for
the
loca3on
of
a
new
Home
Depot
and
Albertson
 Grocery
Store. Wildflower
Deten3on
Pond
will
provide
for
adequate
reten3on
of
storm
water
runoff
to
prevent
future
flash
 flooding
of
areas
in
the
City
of
West
Jordan. Copperton
Reservoir
Project
will
provide
for
storage
of
potable
water
for
the
City
of
West
Jordan
water
system.













2,000,000


95

Alexandria

VA

CDBG

Construct
the
Eisenhower
Avenue
Shared
Use
Path Underpass
(Phase
1A).














750,000


10

Alexandria

VA

CDBG












1,000,000


13

Alexandria

VA

CDBG












3,450,000


46

Alexandria

VA

CDBG












4,000,000


53

Alexandria

VA

Energy














800,000


11

Alexandria

VA

Energy












2,000,000


27

Alexandria

VA

Energy

Rehabilitate
or
replace
sec3ons
of
the
Mount
Vernon
Trail
in
Old
Town
Alexandria
to
provide
connec3ons
to
 Washington,
DC
and
George
Washington's
Mount
Vernon
estate. Rehabilitate
or
replace
sidewalks
for
seven
blocks
on
King
Street
(from
the
Waterfront
Unit
block
to
 Washington
Street)
in
historic
Old
Town
Alexandria. Construct
a
two‐mile,
linear,
non‐motorized
transporta3on
corridor
in
Potomac
Yard,
to
connect
Braddock
 Road
Metro
with
Four
Mile
Run
Park. Convert
all
of
the
City’s
exis3ng
incandescent
traffic
signal
displays
to
LED
lamps.

Conver3ng
to
more
efficient
 LED
lamps
will
reduce
energy
consump3on
by
an
es3mated
90%.
Conver3ng
to
LED
displays
should
save
an
 es3mated
11,826
KWH
annually.

Thi Addi3on
of
microturbine
co‐generators
at
5
City
Recrea3on
Centers
and
at
City
Hall
to
mi3gate
power
 conges3on
and
facilitate
clean
energy
genera3on
in
each
area. Green
roof
‐‐
Wastewater
Treatment
Facility












2,000,000


27

Alexandria

VA

Energy

Energy
Retrofit
‐‐
Wastewater
Treatment
Facility

Alexandria Alexandria

VA VA

Housing Housing

80 2














234,089


3

Alexandria

VA

Housing

Scafered
Sites
II
‐
Saxony
Place
Substan3al
rehabilita3on
of
five
(5)
affordable
hoiusing
units
due
to
age,
wear
 Substan3al
Rehabilita3on
of
15
Affordable
housing
units,
building
&
site
due
to
old
age
and
substandard
 condi3ons. Substan3al
Rehabilita3on
of
38
Affordable
housing
units
for
seniors
and
disable
persons
at
Park
Place
.















6,000,000
 












162,500















323,000


4

City

State

Program

Alexandria

VA

Housing

Alexandria

VA

Housing

Alexandria

VA

Housing

Alexandria

VA

Housing

Alexandria

VA

Housing

Alexandria

VA

Public
Safety

Building
Envelope
and
Infrastructure
Replacement
and
Repairs
to
nine
(9)
Scafered
Sites
Public
Housing
 affordable
housing
due
age,
wear
and
deteriora3on. Cameron
Valle
Scatered
Sites
II: Substan3al
structural
repairs
to
building
founda3ons,
structure,
and
building
envelope
due
to
age
and
effects
 of
erosion.
Total
of
fibeen
(15)
public
housing
homes. Scafered
Sites
II,
W.
Braddock
Rd.:

Substan3al
rehabilita3on
of
site,
including
erosion
control
and
building
 structures
(affordable
housing
units). Ladrey
Senior
High‐Rise
Building
(170
units
for
seniors
and
dicable): Substan3al
replacement
and
repair
of
building
envelope,
structure
and
systems
due
to
age,
wear
and
tear
 Substan3al
Rehabilita3on
of
80
substandard
public
housing
units
including
building,
site
and
interior
due
to
 building
age
and
deteriora3on. Computer
Crimes
Equipment
and
Technology
to
conduct
forensic
analysis
on
electronic
devices.

Project
Descrip3on

Alexandria

VA

Public
Safety

Alexandria

VA

Alexandria

Funding
Required

Jobs














390,000


5














375,550


5














515,917


7














875,000


12












1,762,574


23
















90,000


1

Firearms
Diagnos3c
Unit
















26,000


1

Public
Safety

Moving
radar
for
motorcycles
(10
units)
















32,000


1

VA

Public
Safety

T3
Mo3on
electric
Vehicles
















33,000


1

Alexandria

VA

Public
Safety

Wireless
Network
Encryp3on
for
Mobile
Computer
transmissions














118,000


2

Alexandria

VA

Public
Safety

NBPD
SRO
Program














210,000


3

Alexandria

VA

Schools














400,000


5

Alexandria

VA

Schools












1,104,000


15

Alexandria

VA

Schools












1,700,000


23

Alexandria

VA

Schools












6,234,000


83

Alexandria

VA

Schools










11,059,000


147

Alexandria

VA

Schools










11,022,000


147

Alexandria

VA

Streets/Roads

School
Bus
Two
Way
Communica3on
System 
Virginia
State
law
was
changed
as
of
July
1,
2008,
and
school
bus
drivers
are
not
allowed
to
operate
cell
 phones
while
driving
their
vehicles.
This
project
would
provide
a
two
way
radio
system.

School
bus
drive Elementary
Classroom
Mobile
Laptop
Carts
: This
project
is
for
the
implementa3on
of
mobile
laptop
carts
at
13
elementary
schools.
Currently,
classrooms
 compete
for
25
stand
alone
worksta3ons
in
the
schools’
computer
labs.
This
transi3on
would
place
2
 Emergency
Generators: Installa3on
of
emergency
 generators
and
automa3c
changeover
switches
to
allow
the
opera3on
of
school
facili3es
as
shelters
in
the
 event
of
power
outages.
Cri3cal
building
systems
to
be
powered
by
the
emergency
generator
wou James
Polk
Elementary
School‐‐
Replacement
of
the
HVAC
systems
throughout
the
facility,
including
the
hot
 water
boilers,
central
system
pumps,
hot
and
chilled
water
piping,
fan
coil
units
in
every
classroom,
air
 handling
units
for
mul3purpose
room,
cafet John
Adams
Elementary
School‐‐ 
Replacement
of
the
HVAC
systems
throughout
the
facility,
including
the
central
pumps,
hot
and
chilled
water
 piping,
fan
coil
units
in
every
classroom,
air
handling
units
for
gymnasium,
auxiliary
gym,
cafeteria,
library,
 Minnie
Howard
School‐‐
Replacement
of
the
HVAC
systems
throughout
the
two
story
classroom
wing,
the
 gymnasium
wing,
and
the
admin
wing
of
the
facility,
including
the
hot
water
boilers,
the
air
cooled
chiller,
 central
system
pumps,
hot
and
chilled
water
pi Replace
all
guard
rail
ends
to
meet
the
current
safety
standards
of
State
and
Federal
requirements.














900,000


12

Alexandria

VA

Streets/Roads

Pave
King
Street
from
the
Waterfront
to
King
Steet
Metro
Sta3on
in
Historic
Old
Town,
Alexandria.












1,200,000


16

Alexandria

VA

Streets/Roads












1,500,000


20

Alexandria

VA

Streets/Roads












2,100,000


28

Alexandria

VA

Streets/Roads












7,500,000


102

Alexandria

VA

Transit

Pave
‐‐
overlay
the
concrete
streets
at
the
I‐395
overpasses
on
Duke
Street
and
King
Street
and
Eisenhower
 Avenue
from
Bluestone
Road
to
Holmes
Run
Bridge. Pave
all
streets
in
historic
Old
Town,
Alexandria
within
the
following
grid:
Waterfront
to
Franklin
Street,
to
St.
 Asaph
Street
to
Pendleton
Street
to
the
waterfront. Reconstruc3on
of
Madison
&
Montgomery
Streets
between
Fairfax
and
St
Asaph
Streets.

Theses
streets
 par3ally
lie
over
an
abandoned
landfilled
canal.

Subbase
will
need
to
be
stabilized,
in
addi3on
to
some
full
and
 par3al
depth
roadway
reconstruc3on.
 Purchase
and
install
foldable
bicycle
racks
for
all
DASH
buses
to
improve
mul3‐modal
transporta3on
op3ons.














400,000


5

Alexandria

VA

Transit












2,400,000


32

Alexandria

VA

Transit












5,500,000


73

Alexandria

VA

Water












1,500,000


20

Alexandria

VA

Water

Purchase
four
hybrid‐vehicle
converted
trolleys
and
ini3ate
City‐run
trolley
service
to
replace
exis3ng
 contractor
service.
Trolley
available
as
a
free
service
10
a.m.
to
10
p.m.
daily
in
Alexandria
historic
Old
Town
 district.
Bus
build
and
hybrid
retro Purchase
addi3onal
buses
for
Alexandria
Transit
Company
(DASH)
to
defray
replacement
costs
of
new
buses,
 and
forestall
fare
increases
that
would
otherwise
be
imposed
on
residents. Construc3on
of
stormwater
bypass
to
alleviate
localized
flooding
at
the
intersec3on
of
Key
Drive
and
Francis
 Hammond
Parkway. Reline
three
miles
of
storm
sewer
pipe
on
the
West
End
of
Alexandria.












1,800,000


24

Alexandria

VA

Water

Chemical
system
upgrade
at
Wastewater
Treatment
Facility












2,000,000


27

Alexandria

VA

Water

Commonwealth
Sewer
Rehabilita3on
and
Repair












2,500,000


33

Alexandria

VA

Water

Transformer
and
switch
gear
replacement
at
Wastewater
Treatment
Facility












3,000,000


40

Alexandria

VA

Water

Perform
channel
maintenance
in
Backlick
Run
and
Holmes
Run
from
the
R/R
bridge
to
Park
Drive.












3,500,000


46

Alexandria

VA

Water

Replacement
of
aging
bulkhead
at
Windmill
Park
along
Potomac
River.














5,500,000


73

Alexandria

VA

Water












7,500,000


100

Alexandria

VA

Water

Remedia3on
of
infiltra3on/inflow
condi3ons
for
por3ons
of
the
sanitary
sewer
system
in
the
Holmes
Run
 Sewershed.

 Security
and
energy
upgrades
at
Wastewater
Treatment
Facility












9,000,000


120

Alexandria

VA

Water










24,000,000


320

Colonial
Beach

VA

Public
Safety














500,000


20

Colonial
Beach

VA

Water












3,480,000


30

Fredericskburg

VA

CDBG

Storm
Sewer
improvement
project
to
alleviate
localized
flooding
at
the
intersec3on
of
Braddock
Road
and
 West
Street.
This
project
would
also
remove
storm
water
from
City
combined
sewer.

 New
Police
Facility.
This
5400
square
b.
facility
will
replace
the
current
facility
which
was
built
in
1940.

The
 exis3ng
facility
floods
during
heavy
rains
and
ADA
accessibility
is
inadequate,
at
best. The
Town
is
strategically
located
on
the
banks
of ‐WATER
Install
approximately
6000
linear
b
of
8"
water
line
on
Livingstone
Street
and
Colonial
Avenue
between
 Washington
Avenue
and
Billingsley
and
Taggert
connec3ng
to
exis3ng
8"
looped
mains
at
ends ‐6800
linear
feet
of
replacement
water
main
on
Ban Riverfront
Park

Fredericskburg

VA

Energy

New
Court
Building
‐
Replacement
of
Three
Exis3ng
Courts
in
downtown
‐
LEED
Cer3fied

Fredericskburg

VA

Streets/Roads

Fredericskburg

VA

Streets/Roads

Fredericskburg

VA

Fredericskburg Fredericskburg












4,000,000


16










60,000,000


300

Pathways
‐
Cowan
Boulevard
Connector














175,000


1

Pathways
‐
Embrey
Dam
/
Rappahannock
Canal














520,000


2

Streets/Roads

Pedestrian
Safety
and
Traffic
Signal
Improvements
‐
City‐wide














500,000


2

VA

Streets/Roads

Princess
Anne
Street
Intersec3on
Improvements
‐
Traffic
and
Pedestrian
Safety














500,000


2

VA

Streets/Roads

Pathways
‐
Rappahannock
River
Heritage
Trail














700,000


3

City

State

Program

Fredericskburg

VA

Streets/Roads

Rehabilita3on
of
U.S.
1
Bridge
over
the
Rappahannock
Canal

Project
Descrip3on

Funding
Required 












750,000


Jobs

Fredericskburg

VA

Streets/Roads

Rehabilia3on
of
the
U.S.
1
Bridge
Over
State
Route
3














950,000


4

Fredericskburg

VA

Streets/Roads

Rehabilita3on
of
U.S.
1
Bridge
over
Hazel
Run














970,000


4

Fredericskburg

VA

Streets/Roads

Replacement
of
the
Fall
Hill
Avenue
Bridge
over
the
Rappahannock
Canal














941,600


4

Fredericskburg

VA

Streets/Roads

Pathways
‐
Virginia
Central
Railway












1,880,000


8

Fredericskburg

VA

Streets/Roads

Street
Reconstruc3on
or
Rehabilita3on
‐
City
Wide












2,000,000


8

Fredericskburg

VA

Streets/Roads










11,500,000


46

Fredericskburg

VA

Water

Replace
Fall
Hill
Avenue
Bridge
over
I‐95
and
lane
widening
of
Fall
Hill
Avenue
between
I‐95
and
Carl
D.
Silver
 Parkway Wastewater
Treatment
Plant
Upgrades












4,000,000


16

Hampton

VA

CDBG

Queen
Street/Lincoln
Street
Connector
Road














200,000


4

Hampton

VA

CDBG

Kecoughtan
Corridor
Streetscape
at
the
City
Line














400,000


8

Hampton

VA

CDBG

Buckroe
Soccer
Fields,
Phase
2














500,000


10

Hampton

VA

CDBG

Mercury
Boulevard/Mallory
Street
Streetscape














500,000


10

Hampton

VA

CDBG

Newmarket
Creek
Trail,
Phase
1














800,000


16

Hampton

VA

CDBG

Newtown
Learning
Center












1,000,000


20

Hampton

VA

CDBG

Crossroads
Parking
Lots












1,375,000


28

Hampton

VA

CDBG

Phoebus
Waterfront
Improvements












1,450,000


29

Hampton

VA

CDBG

Pembroke
Avenue
Streetscape
in
Buckroe












1,650,000


33

Hampton

VA

CDBG

Old
Hampton
Community
Center












9,000,000


180

Hampton

VA

Energy

Upgrade
Traffic
Signals
to
All
LED
Throughout
the
City

Hampton

VA

Energy

Big
Bethel
Road
Fire
Sta3on

Hampton

VA

Housing

Hampton

VA

Housing

Hampton

VA

Hampton

3














325,000


7












3,000,000


60

Clean
HVAC
Duct
Work
at
North
Phoebus
Townhouses
















25,000


2

Electrical
Panel
Replacement
at
North
Phoebus
Townhouses














150,000


2

Housing

Hot
Water
Heater
Replacement
at
North
Phoebus
Townhouses
















54,200


2

VA

Housing

Carpet
Replacement
for
Lincoln
Park
High‐Rise














153,400


6

Hampton

VA

Housing

Roof
Replacement
for
Lincoln
Park
High‐Rise














109,100


6

Hampton

VA

Housing

Roof
Replacement
for
Lincoln
Park
Low‐Rise












1,031,000


6

Hampton

VA

Housing

Roof
Replacement
for
Lincoln
Park
Management
Office
















18,000


6

Hampton

VA

Housing

Roof
Replacement
for
Suzanne
Jones
Day
Care
Facility
















96,200


6

Hampton

VA

Housing

Vinyl
Flooring
Replacement
for
Lincoln
Park
High‐Rise
















39,300


6

Hampton

VA

Housing

Asphalt
Repair
and
Overlay
at
Langley
Village
Apartment
Complex
















89,110


8

Hampton

VA

Public
Safety














164,000


1

Hampton

VA

Public
Safety

Surveillance
Equipment
for
the
Intelligence
Unit
and
Gang
Unit,
Undercover
Intel
Vehicle,
and
Intel
Analyst
 Posi3on Expansion
of
Crime
Scene
Unit
to
Include
Addi3onal
Forensic
Technicians
and
Forensic
Worksta3ons














303,000


2

Hampton

VA

Public
Safety

Update
to
Marine
Patrol
Ac3vi3es
to
Include
Addi3onal
Officers
and
Support
Equipment














583,000


2

Hampton

VA

Public
Safety












1,100,000


2

Hampton

VA

Public
Safety

Update
to
SWAT
and
Homeland
Security
Units
to
Include
Addi3onal
Officers,
Ballis3c
Equipment,
and
Logis3c
 Support
Equipment Addi3onal
School
Resource
Officers














500,500


4

Hampton

VA

Public
Safety

Air
Tac3cal
Unit
Support
and
Equipment












3,500,000


6

Hampton

VA

Public
Safety

Emergency
Communica3on
System
Upgrade
to
Replace
the
Current
and
Outdated
Analog
System










15,500,000


8

Hampton

VA

Public
Safety












1,240,100


12

Hampton

VA

Schools

Enhancements
to
the
High
Impact
Unit
to
Include
Addi3onal
Officers,
Vehicles,
and
Equipment
Necessary
for
 this
Unit
to
Respond
to
Specialized
Patrol
Challenges 6
Middle
School
Locker
Room
Upgrades














500,000


10

Hampton

VA

Schools

Cary
Elementary
School
Improvements
















40,000


10

Hampton

VA

Schools

Forrest
Elementary
School
Parking
Lot
Expansion














350,000


15

Hampton

VA

Schools

Krab
Elementary
School
Parking
Lot
Upgrades














350,000


15

Hampton

VA

Schools

Machen
Elementary
School
Parking
Lot
Expansion














225,000


15

Hampton

VA

Schools

Merrimack
Elementary
School
Parking
Lot
Expansion














225,000


15

Hampton

VA

Schools

Tyler
Elementary
School
Replacement
of
Deteriora3ng
Steel
Front
Canopy














200,000


15

Hampton

VA

Schools

Darling
Stadium
Improvements
(Serves
4
High
Schools)












1,000,000


20

Hampton

VA

Schools

Phillip
Elementary
School
Improvements
to
Include
Parking
Lot
Expansion
adn
Hallway
Asbestos
Abatement














290,000


20

Hampton

VA

Schools

Bryan
Elementary
School
Improvements














900,000


25

Hampton

VA

Schools

Booker
Elementary
School
Renova3on












1,000,000


30

Hampton

VA

Schools

Eaton
Middle
School
Auditorium
Upgrades














500,000


30

Hampton

VA

Schools

Kecoughtan
High
School
Auditorium
Upgrades














500,000


30

Hampton

VA

Schools

Mallory
Elementary
School
HVAC
and
Window
Replacement















600,000


30

Hampton

VA

Schools

Spratley
Middle
School
Auditorium
Upgrades














500,000


30

Hampton

VA

Schools

Tucker
Capps
Elementary
School
Improvements














290,000


35

Hampton

VA

Schools

All
Schools'
Kitchens
(34)
HVAC
Upgrade















850,000


40

Hampton

VA

Schools

Burbank
Elementary
School
Improvements














650,000


45

Hampton

VA

Schools

24
Elementary
School
Gymnasium
Addi3ons










16,800,000


50

Hampton

VA

Schools

New
Transporta3on
Opera3ons
and
Maintenance
Facility












6,000,000


50

Hampton

VA

Schools

Various
Schools
Ligh3ng
Upgrades
and
HVAC
Controls












2,500,000


50

Hampton

VA

Schools

Bethel
High
School
Renova3on












5,000,000


60

Hampton

VA

Schools

Lindsay
Middle
School
Improvements










10,000,000


60

Hampton

VA

Schools

Syms
Middle
School
Improvements
(If
New
Construc3on
Is
Not
Funded)










10,000,000


60

Hampton

VA

Schools

Davis
Middle
School
Renova3ons










10,300,000


80

Hampton

VA

Schools

Phoebus
High
School
Improvements













1,550,000


80

Hampton

VA

Schools

Hampton
High
School
Renova3ons












6,200,000


120

Hampton

VA

Schools

New
150,000
sq.
b.
PK‐8
School
Facility
for
1,000
Students










43,570,000


180

Hampton

VA

Schools

Replacement
of
Syms
Middle
School,
Tyler
Elementary
School,
and
Langley
Elementary
School










54,880,000


180

City

State

Program

Hampton

VA

Streets/Roads

Pembroke
Avenue/Queen
Street
Drainage
Improvements,
Phase
2

Project
Descrip3on

Funding
Required 












250,000


Jobs

Hampton

VA

Streets/Roads

Traffic
Signal
Re3mings
Throughout
the
City














260,000


5

Hampton

VA

Streets/Roads

Traffic
Sign
Replacement
Throughout
the
City














300,000


6

Hampton

VA

Streets/Roads

E
Street
Improvements
in
Copeland
Industrial
Park














400,000


8

Hampton

VA

Streets/Roads

Underwater
Repairs
to
Bridges














500,000


10

Hampton

VA

Streets/Roads

Exis3ng/Substandard
Guardrail
Replacement/Upgrades














540,000


11

Hampton

VA

Streets/Roads

Rawood
Stormwater
Deten3on














710,000


14

Hampton

VA

Streets/Roads

Canal
Repairs












1,000,000


20

Hampton

VA

Streets/Roads

Intersec3on
Improvements
Throughout
the
City












1,100,000


22

Hampton

VA

Streets/Roads

Coliseum
North
Quality
Basin












1,725,000


35

Hampton

VA

Streets/Roads

Lifle
England
Phase
3&4
Drainage
Improvements












2,000,000


40

Hampton

VA

Streets/Roads

Span
Wire
to
Master
Arm
Conversions
Upgrades
(10
Conversions
Total)












2,050,000


41

Hampton

VA

Streets/Roads

Mercury
Boulevard
Resurfacing
and
Rehabilita3on












6,500,000


130

Hampton

VA

Streets/Roads

Resurfacing
Throughout
the
City,
Including
Arterial,
Collector
and
Residen3al
Roads










15,000,000


300

Hampton

VA

Water

Pumping
Sta3on
Emergency
Isola3on
Valve
Project














180,000


4

Hampton

VA

Water

Fats,
Oils,
Greases
(FOG)
Abatement
Program
‐
Start
Up
Costs
for
This
Mandated
Program














225,000


5

Hampton

VA

Water

Crossroads
Pumping
Sta3on












1,000,000


20

Hampton

VA

Water

Pumping
Sta3on
SCADA
System
Replacement












1,200,000


24

Hampton

VA

Water

Pumping
Sta3on
Emergency
Generators/Bypass
Equipment












1,500,000


30

Hampton

VA

Water

Collec3on
System
Hydraulic
Model
Project












1,600,000


32

Hampton

VA

Water

Electrical
Upgrades
to
40
Terminal
Pump
Sta3ons
and
25
Variable
Frequency
Drives












1,600,000


32

Hampton

VA

Water

Back
River
Dredging/Factory
Point
Restora3on












5,000,000


100

Hampton

VA

Water

Infrastructure
Repair
to
the
City's
Sewer
System
to
Comply
with
State
and
Federal
Mandates










71,500,000


1430

Lynchburg

VA

CDBG

Yoder
Neighborhood
Center
addi3on














250,000


15

Lynchburg

VA

CDBG

BWC
athle3c
field
renova3on














600,000


25

Lynchburg

VA

CDBG

Riverside
Park
renova3on,
phase
1














700,000


35

Lynchburg

VA

CDBG

Ivy
Creek
Park
construc3on












2,000,000


50

Lynchburg

VA

CDBG

Miller
Center
renova3on












3,500,000


50

Lynchburg

VA

CDBG

Riverfront
Development
including
riverwalk












9,800,000


69

Lynchburg

VA

Energy

Building
HVAC
Upgrades












1,200,000


23

Lynchburg

VA

Energy

City/Schools
Energy
Audit
and
Upgrades












1,500,000


23

Lynchburg

VA

Energy

Public
Works
Complex
Inprovements










12,500,000


23

Lynchburg

VA

Streets/Roads

Retaining
wall
inventory
and
mapping














375,000


15

Lynchburg

VA

Streets/Roads

Florida
Ave
Bridge
Replacement














500,000


23

Lynchburg

VA

Streets/Roads

Grace
St
retaining
wall
improvements












2,130,000


23

Lynchburg

VA

Streets/Roads

Guardrail
replacement












1,000,000


23

Lynchburg

VA

Streets/Roads

Kanawa
Canal
Bridge
stabiliza3on














300,000


23

Lynchburg

VA

Streets/Roads

Lynchburg
Expressway
overlay
and
safety
improvements












5,200,000


23

Lynchburg

VA

Streets/Roads

Main
St
wall














250,000


23

Lynchburg

VA

Streets/Roads

Reusen's
Rd
improvements














275,000


23

Lynchburg

VA

Streets/Roads

Sidewalk
Replacement












2,000,000


23

Lynchburg

VA

Streets/Roads

Street
Paving












5,000,000


23

Lynchburg

VA

Streets/Roads

Trents
Ferry
Wall
















30,000


23

Lynchburg

VA

Streets/Roads

12th
St
Corridor
improvements












3,500,000


46

Lynchburg

VA

Streets/Roads

D
St
Bridge
Repair












4,000,000


46

Lynchburg

VA

Streets/Roads

Forest
Brook
Rd
Improvements
















75,000


46

Lynchburg

VA

Streets/Roads

Kings
Dr
Improvements














705,000


46

Lynchburg

VA

Streets/Roads

Main
St
Gateway
improvements












1,500,000


46

Lynchburg

VA

Streets/Roads

Retaining
wall
replacement‐
BWC
and
6th
St)












1,000,000


46

Lynchburg

VA

Streets/Roads

Breezewood
Dr,
Phase
2












2,530,000


69

Lynchburg

VA

Streets/Roads

Kemper
St
bridge
replacement












4,000,000


69

Lynchburg

VA

Streets/Roads

Lower
Bluffwalk












5,000,000


69

Lynchburg

VA

Streets/Roads

Rivermont
Bridge
Repair












5,000,000


69

Lynchburg

VA

Streets/Roads

Fibh
St
Improvements












4,000,000


92

Lynchburg

VA

Water

1.4MG
Water
Tank
Rehab














500,000


23

Lynchburg

VA

Water

Blue
Ridge
Farms












1,500,000


23

Lynchburg

VA

Water

Comprehensive
Storm
Sewer
Inventory
and
Maping














500,000


23

Lynchburg

VA

Water

Confederate
Ave
water
line














150,000


23

Lynchburg

VA

Water

Florida
Ave
Bridge














130,000


23

Lynchburg

VA

Water

Jefferson
St
Phase
III
water














280,000


23

Lynchburg

VA

Water

JRI
Div
2‐
Replace
4,000
feet
of
large
diameter
sewer.










20,000,000


23

Lynchburg

VA

Water

JRI
Div
5‐
Replace
12,500
feet
of
large
diameter
sewer.










15,000,000


23

Lynchburg

VA

Water

JRI
Div
6‐
Replace
6,000
of
large
diameter
sewer.










10,000,000


23

Lynchburg

VA

Water

Knight
St
Small
Mains














580,000


23

Lynchburg

VA

Water

Leesville
Sewer
Extension














150,000


23

Lynchburg

VA

Water

Misc.
Sewer
Extension
Projects














200,000


23

Lynchburg

VA

Water

Moreview
Sewer
Extension














350,000


23

Lynchburg

VA

Water

Old
Forest
Road
Water














475,000


23

Lynchburg

VA

Water

Patrick
and
York
Small
Mains














630,000


23

Lynchburg

VA

Water

Pedlar
Dam
Improvements












1,000,000


23

5

City

State

Program

Lynchburg

VA

Water

Town
Crier‐
Water
main
replacement.

Project
Descrip3on

Funding
Required 














30,000


Jobs 23

Lynchburg

VA

Water

Lynchburg

VA

Water

Villas
at
Stone
Mill
PRV
















55,000


23

Wards
Ferry
Culvert














400,000


Lynchburg

VA

Water

23

CSO
16.3












4,000,000


Lynchburg

VA

35

Water

CSO
1A5












3,600,000


Lynchburg

35

VA

Water

CSO
1B4.1‐
Separate
residen3al
sewers.












5,400,000


35

Lynchburg

VA

Water

CSO
1D3












6,000,000


35

Lynchburg

VA

Water

CSO
1D3.1B‐
Separate
residen3al
sewers.












3,500,000


35

Lynchburg

VA

Water

CSO
1D3.2












7,000,000


35

Lynchburg

VA

Water

CSO
2.2‐
Separate
residen3al
sewers.












4,000,000


35

Lynchburg

VA

Water

Midtown
Connector












1,500,000


35

Norfolk

VA

CDBG

Install
ADA
Ramps














200,000


15

Norfolk

VA

CDBG

Cecilia
Street
Replacement












4,000,000


40

Norfolk

VA

CDBG

Consruct
Bay
Oaks
Park












6,000,000


60

Norfolk

VA

CDBG

NRHA
Facili3es
Consolida3on










10,000,000


100

Norfolk

VA

Energy

Install
Programmable
Thermostats
in
City
Hall














250,000


3

Norfolk

VA

Energy

Implement
traffic
signal
LED
lamp
replacement
project
at
City
Hall.














200,000


12

Norfolk

VA

Energy














200,000


18

Norfolk

VA

Energy

Install
Direct
Digital
Controls
on
several
facili3es
across
the
City

Tarrallton
Recrea3on
Center
 Vivian
C.
Mason
Granby
Municipal
Center School
Administra3on
Building
–
replace
exis3ng
ligh3ng
in
this
13
story
building
with
energy
efficient
T‐5
lights














600,000


25

Norfolk

VA

Energy

City
Hall
Building
–
replace
the
exis3ng
ligh3ng
in
the
11
story
building
with
energy
efficient
T‐5
lights














600,000


35

Norfolk

VA

Energy














275,000


40

Norfolk

VA

Energy














255,000


40

Norfolk

VA

Energy












1,073,000


42

Norfolk

VA

Energy














625,000


46

Norfolk

VA

Energy

Replace
the
main
hea3ng
and
cooling
system
with
an
energy
efficient
geo‐thermal
central
system
at
the
Van
 Wyck
Library. Vector
Control
Building
–
replace
the
main
hea3ng
and
cooling
system,
a
boiler
and
through
the
wall
spot
 cooler
air
condi3oning
system
with
an
energy
efficient
geo‐thermal
central
system Central
Energy
Plant‐
replace
combus3on
equip
and
install
controls
for
max
efficiency
and
install
heat
 exchanger Park
Place
Mul3‐purpose
Center
–
the
exis3ng
HVAC
system
is
composed
of
an
electric
boiler
and
cooling
 tower
providing
water
to
40
Florida
heat
pumps.
This
project
will
add
direct
digital
controls
to
the
units
and
 replace
the
boiler
and
tower
with
an
en Replace
47
year
old
coils,
install
variable
speed
drives,
and
replace
condensing
units
in
City
Hall.














633,000


55

Norfolk

VA

Energy












1,582,000


125

Norfolk

VA

Energy

Replace
the
main
hea3ng
and
cooling
system
in
the
Seaboard
Building.

Add
direct
digital
controls
to
the
 facility,
replace
the
main
hea3ng
and
cooling
plant,
and
repair
all
main
air
handlers. Norfolk
Public
Schools
Energy
Conserva3on
Plan
Implementa3on











25,947,614


150

Norfolk

VA

Housing

Install
security
cameras,
infrastructure,
and
monitoring
sta3ons
in
public
housing
neighborhoods












5,500,000


10

Norfolk

VA

Housing

Install
new
energy
efficient
windows
at
Calvert
Park














850,000


15

Norfolk

VA

Housing

Modernize
electrical
infrastructure
in
Young
Terrace














800,000


15

Norfolk

VA

Housing

Install
new
air
handlers
in
each
apartment
and
new
mechanical
room
at
Sykes
Senior
Midrise












1,170,000


20

Norfolk

VA

Housing

Restore
approx
1600
b.
of
shoreline
on
eastern
branch
of
Elizabeth
River












1,500,000


20

Norfolk

VA

Housing

Construct
new
roads,
parking
layout,
and
streetscape
improvements
at
Oakleaf
Forest
Housing
Site












3,000,000


30

Norfolk

VA

Housing












3,120,000


50

Norfolk

VA

Housing

Install
energy
efficient
windows,
rehabilitate
hea3ng,
shore
up
founda3ons
and
erosion
control
at
Tidewater
 Gardens Redevelop
Moton
Circle
Neighborhood












5,000,000


55

Norfolk

VA

Public
Safety

ICx
Tac3cal
Plazorms
(2)















240,000


5

Norfolk

VA

Public
Safety

Install
Gunshot
Detec3on/Video
Camera
System
in
select
high
crime
areas














610,000


5

Norfolk

VA

Public
Safety

Purchase
and
implement
E‐Summonsing
sobware
and
equipment














300,000


5

Norfolk

VA

Public
Safety

Renovate
aging
Emergency
Communica3ons
Center
Common
areas,
restrooms,
and
lounge














120,000


5

Norfolk

VA

Public
Safety

Norfolk

VA

Public
Safety

Install
video
conferencing
equipment,
smart
traffic
data
feed,
wireless
portable
camera/monitoring,
coplogic
 on‐line
ci3zen
repor3ng
technology,
and
EOC
technology
enhancements Construct
and
establish
a
Curfew
Assessment
Center

Norfolk

VA

Public
Safety

Upgrade
obsolete
Emergency
Communica3ons
Center
analog
911
phone
system
with
digital.

Norfolk

VA

Public
Safety

Norfolk

VA

Public
Safety

Expand
and
renovate
the
Emergency
Communica3ons
Center
to
include
18
addi3onal
response
sta3ons,

and
 training
room.
 Construct
a
new
2nd
Precinct
Police
Facility


Norfolk

VA

Schools

Ocean
View
Elementary
School
Addi3on












3,612,000


12

Norfolk

VA

Schools

Ingleside
Elementary
School
Addi3on












4,370,000


15

Norfolk

VA

Schools

St.
Helena
Elementary
School
Renova3on












4,803,000


16

Norfolk

VA

Schools

Tidewater
Park
Elementary
School
Addi3on












4,803,000


16

Norfolk

VA

Schools

Oakwood
Elementary
School
Renova3on












5,735,000


19

Norfolk

VA

Schools

Direct
Fiber
Link
to
ODU,
TCC,
NSU,
and
the
City
of
Norfolk














250,000


20

Norfolk

VA

Schools

Sewells
Point
Elementary
School
Addi3on












6,234,000


21

Norfolk

VA

Schools

Tidewater
Park
Elementary
School
Renova3on












6,722,000


22

Norfolk

VA

Schools

Fairlawn
Elementary
School
Addi3on












6,991,000


23

Norfolk

VA

Schools

Ocean
View
Elementary
School
Renova3on












7,984,000


27

Norfolk

VA

Schools

Sewells
Point
Elementary
School
Renova3on












8,022,000


27

Norfolk

VA

Schools

Fairlawn
Elementary
School
Renova3on












8,513,000


28

Norfolk

VA

Schools

St.
Helena
Elementary
School
Addi3on












8,564,000


29

Norfolk

VA

Schools

Campostella
Elementary
Renova3on












5,000,000


30

Norfolk

VA

Schools

Ingleside
Elementary
School
Renova3on










11,017,000


37

Norfolk

VA

Schools

Lindenwood
Elementary
School
Replacement










18,537,000


62

Norfolk

VA

Schools

Sherwood
Forest
Elementary
School
Replacement










18,537,000


62














336,500


16












1,500,000


25














700,000


25














500,000


30










18,900,000


60

City

State

Program

Norfolk

VA

Schools

Lake
Taylor
High
School
Renova3on

Project
Descrip3on

Funding
Required Jobs 








19,781,000
 66

Norfolk

VA

Schools

Northside
Middle
School
Renova3on










19,781,000


66

Norfolk

VA

Schools

Construct
Crossroads
Elementary
Replacement










33,000,000


70

Norfolk

VA

Schools

Constructe
Rosemont
Elementary
Replacement










35,000,000


70

Norfolk

VA

Schools

Replace
Schools'
Warehouse
and
Food
Prepara3on
Facility










25,000,000


75

Norfolk

VA

Schools

Replace
and
Consolidate
5
Alterna3ve
Schools










35,000,000


80

Norfolk

VA

Schools

Lake
Taylor
Middle
School
Renova3on










49,283,000


164

Norfolk

VA

Streets/Roads

Downtown
Crosswalks
on
Main
Street
and
Pedestrian
Safety
Improvements














900,000


20

Norfolk

VA

Streets/Roads

East
Ocean
View
Storm
Drainage
Improvements












2,000,000


20

Norfolk

VA

Streets/Roads

Fairmont
Park,
streets,
sidewalks,
and
drainage












2,500,000


20

Norfolk

VA

Streets/Roads

St.
Paul's
median
and
pedestrian
safety
and
parking
acess
improvements














900,000


20

Norfolk

VA

Streets/Roads

Lifle
Creek
Road
and
Merrif
Street
Traffic
Signal














300,000


21

Norfolk

VA

Streets/Roads

Lifle
Creek
Road
and
Traffic
Signal












3,300,000


25

Norfolk

VA

Streets/Roads

Ocean
View
Avenue
Improvements
(7th
View
to
15th
View)












2,250,000


25

Norfolk

VA

Streets/Roads

Virginia
Beach
Blvd
Improvements
(Ballen3ne
to
Tidewater)














750,000


25

Norfolk

VA

Streets/Roads

Jamestown
Crescent
Culvert
Replacement














500,000


30

Norfolk

VA

Streets/Roads

Lower
Hampton
Blvd
Improvements












1,400,000


30

Norfolk

VA

Streets/Roads

Raise
Brambleton
Ave
Eleva3on
between
Colley
Ave
and
Smith
Creek












1,800,000


30

Norfolk

VA

Streets/Roads

Terminal
Blvd
Improvements
(Hampton
Blvd
to
Ruthven)












3,500,000


30

Norfolk

VA

Streets/Roads

Five
Points
Intersec3on
Wayfinding
Improvements














500,000


32

Norfolk

VA

Streets/Roads

Lower
Hampton
Blvd
Improvements












3,000,000


35

Norfolk

VA

Streets/Roads

Brambleton
Ave
Safetyand
Median
Improvements












1,750,000


40

Norfolk

VA

Streets/Roads

Fort
Norfolk
Gateway—Brambleton
Ave
and
Colley
Ave
Intersec3on












3,200,000


45

Norfolk

VA

Streets/Roads

Soundwall
Improvements—Phase
III












1,500,000


45

Norfolk

VA

Streets/Roads

Mason
Creek
Bridge
Replacement
and
Norview
Avenue
Airport
Bridge
Rehabilita3on












1,540,000


50

Norfolk

VA

Streets/Roads

Midtown
Tunnel
Improvements










10,000,000


300

Norfolk

VA

Transit

Government
Sta3on
and
City
Hall
Plaza
Light
Rail
Improvements














250,000


15

Norfolk

VA

Transit














385,000


15

Norfolk

VA

Transit

Purchase
Informa3on
Management
System
for
real
3me
bus
displays,
video
conferencing,
mobile
training
 system,
and
hazard/risk
mgt.
system
for
bus
and
rail Light
Rail
Landscaping
Improvements














400,000


20

Norfolk

VA

Transit

Bus
Replacement
for
10
(40b)
Diesel
and
10
(29b)
Hybrid










10,789,680


25

Norfolk

VA

Transit

Light
Rail
Infrastructure
Reloca3on












1,500,000


25

Norfolk

VA

Transit

Harbor
Park
Bus
Transfer
Sta3on














500,000


30

Norfolk

VA

Transit

Replace
11
underground
storage
tanks
at
transit
facility














600,000


30

Norfolk

VA

Transit

Light
Rail
Parking
Structure
at
Military
Hwy












2,000,000


35

Norfolk

VA

Transit

Light
Rail
Parking
Structure
at
Newtown
Road












3,000,000


35

Norfolk

VA

Transit

Salter
Street
Bus
Transfer
Sta3on














550,000


35

Norfolk

VA

Transit

Light
Rail
Access,
Ligh3ng,
and
Pedestrain
Sabey
Improvements












2,350,000


55

Norfolk

VA

Transit

Southside
Transit
Opera3ng
and
Maintenance
Facility
Replacement










16,300,000


185

Norfolk

VA

Water














500,000


10

Norfolk

VA

Water












1,000,000


15

Norfolk

VA

Water












1,000,000


20

Norfolk

VA

Water












1,500,000


28

Norfolk

VA

Water












1,500,000


28

Norfolk

VA

Water












1,500,000


28

Norfolk

VA

Water












1,500,000


28

Norfolk

VA

Water












2,000,000


35

Norfolk

VA

Water












2,000,000


35

Norfolk

VA

Water












2,000,000


35

Norfolk

VA

Water












2,000,000


40

Norfolk

VA

Water












3,000,000


50

Norfolk

VA

Water

Norfolk

VA

Water

Standby
Bypass
Pumps
to
reduce
sanitary
sewer
overflow
‐
Adds
permanently‐mounted
bypass
pumps
to
 cri3cal
sanitary
sewer
pump
sta3ons
to
prevent
sanitary
sewer
overflows
and
their
health
risks
to
the
public Ocean
View
&
Berkley
Tank
Elevated
Water
Tank
Booster
Pump
Sta3ons
‐
Adds
booster
pump
sta3ons
to
the
 Ocean
View
and
Berkley
water
tanks
to
provide
addi3onal
water
pressure
and
flows
for
fire
protec3on Hampton
Boulevard
Water
Main
Replacement
‐
Replacement
of
2,000
linear
foot
of
24‐inch
water
main
which
 has
experienced
mul3ple
failures.

This
main
provides
water
to
Norfolk
Naval
Sta3on Central
Brambleton
Phase
III
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
 in
Central
Brambleton
neighborhood Central
Brambleton
Phase
IV
Water
Upgrade
‐
Replace
and
upgrade
failing
water
in
Central
Brambleton
 neighborhood Colonial
Place
Phase
II
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
 Colonial
Place
neighborhood Park
Place
Phase
IV
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
Park
 Place
neighborhood Chesterfield
Heights
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
 Chesterfield
Heights
neighborhood Fairmont
Park
Phase
7
Water
and
Sewer
Replacement
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
 in
Fairmount
Park
neighborhood Huntersville
Phase
III
Water
and
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
 Huntersville
neighborhood Flood
Protec3on
at
Nofoway
&
Blackwater
Raw
Water
Pumping
Sta3on
‐
Shoreline
stabiliza3on
and
 replacement
of
exis3ng
bulkheads
for
two
raw
water
pumping
sta3ons
that
provide
a
por3on
of
drinking
water
 to
southeastern
Virginia Fort
Norfolk
Water
&
Sewer
Upgrade
‐
Replace
and
upgrade
failing
water
and
sanitary
sewer
in
Fort
Norfolk
 neighborhood Replace
Raw
Water
Mains
in
Various
Loca3ons
‐
3
projects
total
to
replace
(1)
3,000
linear
foot
of
36‐inch
raw
 water
by
Western
Branch
Pumping
(2)
800
linear
foot
of
36‐inch
raw
water
in
Western
Branch
(3)
2,000
linear
 foot
of
raw
water
on
Craney
Island 37th
Street
Water
Treatment
Plant
Upgrade
‐
Replace
and
rehab
por3ons
of
the
60‐year
old
treatment
plant.

Onancock

VA

Water

Roanoke

VA

Streets/Roads

Wastewater
Treatment
Plant
Upgrade.

Upgrading
aging
plant
to
meet
pollutant
removal
requirements
and
 capacity
needs.

Par3al
funding
already
sucured.

 Franklin
Road
Bridge
Repairs

Roanoke

VA

Streets/Roads

Roanoke

VA

Streets/Roads












4,000,000


60










10,000,000


150












7,430,725


12














250,000


15

Public
Works
Service
Center
Improvements














350,000


20

Main
Street
Bridge
Repairs














300,000


25

City

State

Program

Roanoke

VA

Streets/Roads

Walnut
Avenue
Bridge
Repairs

Project
Descrip3on

Funding
Required 












350,000


Jobs 25

Roanoke

VA

Streets/Roads

Roanoke

VA

Streets/Roads

Phase
XVI
Curb
and
Sidewalk














700,000


30

Reserve
Avenue
Streetscape














500,000


Roanoke

VA

Streets/Roads

Four
Bridge
Replacements

30












1,700,000


100

Virginia
Beach

VA

CDBG

Virginia
Beach

VA

CDBG

West
Neck
Creek
Natural
Area














528,000


12

Neighborhood
Park
Renova3ons














720,000


Virginia
Beach

VA

16

CDBG

Recrea3on
Center
Security
Ligh3ng














300,000


Virginia
Beach

17

VA

CDBG

Park
Shelter
Replacements














854,000


19

Virginia
Beach

VA

CDBG

Bow
Creek
Recrea3on
Center
Locker
Room
Renova3ons














250,000


23

Virginia
Beach

VA

CDBG

Kempsville
Recrea3on
Center
Pool
Area
Repairs














400,000


24

Virginia
Beach

VA

CDBG

Marshview
Park
Development












1,376,000


29

Virginia
Beach

VA

CDBG

Recrea3on
Center
Recep3on
Area














350,000


29

Virginia
Beach

VA

CDBG

Kid's
Cove
Playground
Replacement












1,600,000


34

Virginia
Beach

VA

CDBG

Park
Bank
Stabiliza3on
(11
parks)












1,650,000


35

Virginia
Beach

VA

CDBG

Tennis
Court
Replacements












1,800,000


38

Virginia
Beach

VA

CDBG

Park
Water
Quality
Improvements












2,000,000


41

Virginia
Beach

VA

CDBG

Lake
Smith
Natural
Area
Phase
I












2,000,000


42

Virginia
Beach

VA

CDBG

Sportsplex
Deferred
Maintenance












2,300,000


47

Virginia
Beach

VA

CDBG

Seatack
Community
Center
Expansion












2,200,000


48

Virginia
Beach

VA

CDBG

Stumpy
Lake
Natural
Area
Phase
I












2,500,000


51

Virginia
Beach

VA

CDBG

Lynnhaven
Inlet
Naviga3on
Dredging












2,000,000


55

Virginia
Beach

VA

CDBG

New
Asphalt
Trail
Development












2,640,000


55

Virginia
Beach

VA

CDBG

Sidewalk
Improvements












3,000,000


62

Virginia
Beach

VA

CDBG

Resort
Beach
Hurricane
Protec3on










18,000,000


65

Virginia
Beach

VA

CDBG

Sandbridge
Beach
Hurricane
Protec3on










18,000,000


65

Virginia
Beach

VA

CDBG

Urban
Tree
Canopy
Protec3on












3,750,000


76

Virginia
Beach

VA

CDBG

Trail
Repairs
and
Replacements












3,960,000


80

Virginia
Beach

VA

CDBG

North
Virginia
Beach
61st
Street
Pump
Sta3on










20,000,000


83

Virginia
Beach

VA

CDBG

Rosemont
Forest
Pump
Sta3on












8,000,000


83

Virginia
Beach

VA

CDBG

Parking
Lot
Repairs
and
Replacements
(11
sites)












4,450,000


92

Virginia
Beach

VA

CDBG

Replacement
of
Park
Buildings












4,922,000


100

Virginia
Beach

VA

CDBG

Thalia
Creek
Greenway












7,000,000


142

Virginia
Beach

VA

CDBG

5K
Loop
Trail
Facility












9,600,000


194

Virginia
Beach

VA

CDBG

Open
Space
Acquisi3on










17,677,600


355

Virginia
Beach

VA

CDBG

Williams
Farm
Community
Recrea3on
Center










30,000,000


640

Virginia
Beach

VA

Energy

Central
Plant
Cooling
Tower
and
Chiller
Renova3on












1,000,000


13

Virginia
Beach

VA

Energy

Central
Plant
Pumps
Moderniza3on














225,000


13

Virginia
Beach

VA

Energy

Shore
Drive/Pacific
Avenue
Solar
Powered
Flashing
Lights














110,000


22

Virginia
Beach

VA

Public
Safety

Correc3on
Center
Roof














700,000


24

Virginia
Beach

VA

Public
Safety

K‐9
Building














553,000


34

Virginia
Beach

VA

Public
Safety

Fire
Sta3on
#9
Repairs














800,000


44

Virginia
Beach

VA

Public
Safety

Creeds
Training
Simula3on
City














500,000


46

Virginia
Beach

VA

Public
Safety

Animal
Control
Facility












4,000,000


56

Virginia
Beach

VA

Public
Safety

Fire
and
Rescue
Sta3on
‐
Thalia












6,365,000


102

Virginia
Beach

VA

Schools

College
Park
Elementary










22,392,750


200

Virginia
Beach

VA

Schools

Pupil
Transporta3on
Services










19,850,001


200

Virginia
Beach

VA

Schools

Great
Neck
Middle
School










62,549,253


500

Virginia
Beach

VA

Schools

Kellam
High
School








102,000,000


500

Virginia
Beach

VA

Streets/Roads

First
Colonial
Road/
Old
Dona3on
Parkway
















75,000


7

Virginia
Beach

VA

Streets/Roads

Virginia
Beach
Boulevard/
Cons3tu3on
Drive
















42,000


7

Virginia
Beach

VA

Streets/Roads

Traffic
Signal
Interconnect
Installa3on
















35,000


11

Virginia
Beach

VA

Streets/Roads
















10,000


12

Virginia
Beach

VA

Streets/Roads

Independence
Boulevard/ Ewell
Road Avalon
Avenue












1,650,000


14

Virginia
Beach

VA

Streets/Roads

Bonney
Road/Kentucky
Avenue












1,500,000


14

Virginia
Beach

VA

Streets/Roads

Elbow
Road/Indian
River
Road














850,000


14

Virginia
Beach

VA

Streets/Roads

Godspeed
Road














585,000


14

Virginia
Beach

VA

Streets/Roads

West
Neck
Road
Interim
‐
Phase
I












1,400,000


14

Virginia
Beach

VA

Streets/Roads

Witchduck
Road
Phase
I










27,487,000


24

Virginia
Beach

VA

Streets/Roads

Baker
Road












3,225,000


26

Virginia
Beach

VA

Streets/Roads

Buckner
Boulevard
Extended












2,421,000


26

Virginia
Beach

VA

Streets/Roads

Cons3tu3on
Drive
Extended












9,176,912


48

Virginia
Beach

VA

Streets/Roads

Lynnhaven
Interna3onal












7,800,000


48

Virginia
Beach

VA

Streets/Roads

Princess
Anne
Road
Phase
IV










43,900,000


48

Virginia
Beach

VA

Streets/Roads

Seaboard
Road












7,299,000


48

Virginia
Beach

VA

Streets/Roads

Shore
Drive
Corridor
Improvements
Phase
II










11,100,000


48

Virginia
Beach

VA

Streets/Roads

Shore
Drive
Corridor
Improvements
Phase
III












9,360,000


48

Virginia
Beach

VA

Streets/Roads

Shore
Drive
Corridor
Improvements
Phase
IV










11,700,000


48

Virginia
Beach

VA

Streets/Roads

Citywide
Streetlight
Upgrade














500,000


54

Virginia
Beach

VA

Streets/Roads

Major
Bridge
Rehabilita3on












1,100,000


54

City

State

Program

Virginia
Beach

VA

Streets/Roads

Primary
System
Infrastructure
Improvements

Project
Descrip3on

Funding
Required 










3,500,000


Jobs 54

Virginia
Beach

VA

Streets/Roads

Virginia
Beach

VA

Streets/Roads

Princess
Anne
Road
Phase
VII










17,800,000


60

Virginia
Aquarium
Elevated
Pedestrian
Crosswalk












4,900,000


Virginia
Beach

VA

84

Streets/Roads

Storm
Water
Infrastructure
Rehabilita3on
/
Princess
Anne
Plaza












6,000,000


104

Virginia
Beach Virginia
Beach

VA

Streets/Roads

Street
Reconstruc3on












5,000,000


104

VA

Streets/Roads

Traffic
Signal
Rehabilita3on










11,000,000


104

Virginia
Beach

VA

Streets/Roads

Lynnhaven
Parkway
Phase
XI










31,500,000


210

Virginia
Beach

VA

Streets/Roads

Holland
Road
Phase
VI










45,000,000


304

Virginia
Beach

VA

Streets/Roads

Pavement
Maintenance
Program
Phase
II










45,000,000


304

Virginia
Beach

VA

Streets/Roads

Laskin
Road
Phase
I










76,000,000


365

Virginia
Beach

VA

Streets/Roads

Lesner
Bridge
Replacement










90,000,000


520

Virginia
Beach

VA

Streets/Roads

Nimmo
Parkway
Phase
V










61,700,000


520

Virginia
Beach

VA

Water

Public
U3li3es
Public
Access
Renova3ons
‐
Building
2














300,000


15

Virginia
Beach

VA

Water

Silina
Corvefe
Pump
Sta3on
#511














500,000


15

Virginia
Beach

VA

Water

Regency
Apartments
Pump
Sta3on
#260












1,000,000


18

Virginia
Beach

VA

Water

Lake
Edward
West
Pump
Sta3on
#343












1,000,000


19

Virginia
Beach

VA

Water

Green
Run
Garden
Pump
Sta3on
#547












1,500,000


20

Virginia
Beach

VA

Water

Green
Run/Crimson
Holly
Pump
Sta3on
#549












1,000,000


20

Virginia
Beach

VA

Water

Stumpy
Lake
Dam
and
Spillway
Repairs












1,930,000


24

Virginia
Beach

VA

Water

College
Park
Providence
Road
Pump
Sta3on
#425
Abandonment
and
SS
Realignment












2,800,000


30

Virginia
Beach

VA

Water

SA
#403
Arrowhead
Susquehanna
Sanitary
Sewer
Rehabilita3on
Phase
1












2,800,000


37

Virginia
Beach

VA

Water

Landstown
Yard
Improvements










55,000,000


71

Burlington

VT

Airport

Expansion
of
Airport
Industrial
Park












2,000,000


48

Burlington

VT

Airport

Avia3on
Technical
Center












9,000,000


216

Burlington

VT

CDBG

Waterfront
tent
and
speaker
system
needed
for
events














250,000


Burlington

VT

CDBG














780,000


2

Burlington

VT

CDBG

Memorial
Auditorium
rehab:
replacement
needed
for
bleachers
and
portable
sea3ng
system,
and
electrical
 upgrade vacant
retail
renova3ons














200,000


2

Burlington

VT

CDBG

CarShare
VT
(non‐profit
car‐sharing
program)
start‐up
capital
to
purchase
8
vehicles
and
hire
4
staff;














450,000


4

Burlington

VT

CDBG

Brownfields
clean
up














500,000


9

Burlington

VT

CDBG

Upper
story
redevelopment
downtown












1,000,000


18

Burlington

VT

CDBG














925,000


22

Burlington

VT

CDBG

Church
Street
(downtown
business
district)
improvements:
street
crossing
improvements,
benches,
trees,
brick
 cobbles,
bike
racks,
canopies,
banner
system
and
north
and
south
gateways Complete
build‐out
of
bike
lanes
and
related
ameni3es
in
the
City












1,000,000


24

Burlington

VT

CDBG

Structural
improvements
to
downtown
(College
Street)
parking
garage












1,000,000


24

Burlington

VT

CDBG

Business
loans












2,000,000


26

Burlington

VT

CDBG

Construct
ADA‐accessible
curb
ramps












1,100,000


26

Burlington

VT

CDBG












1,200,000


29

Burlington

VT

CDBG

Median
work
on
Main
Street
to
funnel
pedestrians
to
appropriate
crossings,
maintain
traffic
visibility,
and
serve
 as
gateway
to
city
for
visitors. Redevelopment
of
decommissioned
(Moran)
waterfront
power
plant












3,000,000


80

Burlington

VT

CDBG

Waterfront
Bike
path
reconstruc3on












3,500,000


84

Burlington

VT

CDBG

Retrofit
of
manufacturing
site/building
(Blodgef)










10,000,000


180

Burlington

VT

Energy

Compressed
natural
gas
public
fueling
sta3on












2,000,000


Burlington

VT

Energy

Garage
ligh3ng
energy
retrofit














100,000


2

Burlington

VT

Energy














250,000


4

Burlington

VT

Energy

“DEED”
start‐up
project
to
establish
loan
fund
for
home
energy
efficiency
and
alterna3ve
energy
projects;
long‐ term
loans
connected
to
property
and
not
property
owner,
as
incen3ve
for
energy
projects
regardless
of
how
 long
property
is
owned. Solar
Ci3es
Ini3a3ve:
pilot
project
to
establish
several
solar
electric
genera3ng
loca3ons
across
City

Burlington

VT

Energy

Burlington

VT

Burlington

VT

Burlington














770,000


7

Moran
Center
energy
efficiency
and
alterna3ve
energy
development












1,000,000


13

Energy

Public
building
energy
retrofit












2,000,000


26

Energy

Business
Energy
Efficiency
Program












5,000,000


65

VT

Energy

District
energy
pilot
project










15,000,000


225

Burlington

VT

Housing

10
North
Champlain
Street‐Champlain
Apts:
Range
Replacements,
Kitchen
Renova3ons,
Closet
Door
Upgrades














255,300


Burlington

VT

Housing

1554
North
Avenue‐Franklin
Square:
Fire
Alarm
Upgrade,
Roof
Trim
Pain3ng














100,784


Burlington

VT

Housing

Burlington

VT

Housing

Burlington

VT

Housing

Burlington

VT

Public
Safety

Burlington

VT

Public
Safety

Burlington

VT

Public
Safety

230
St.
Paul
Street‐Decker
Towers:Hea3ng
System
Conversion
to
Gas,
Tub
Drains/Faucet
Repair,
Parking
Lot
 Asphalt
Repairs,
Stucco
Siding
Replacement 669
Riverside
Avenue:
Bathroom
Flooring
Replacement,
Handicap
Ramp
Replacement,
Refrigerator
 Replacement
Toilet
Replacement Hillside
Terrace:
Exterior
Pain3ng,
Kitchen
Cabinets/Countertops/Sink
Replacements,
Tub/Shower
unit
 Replacements,
Walkway/Driveway
Repairs,
French
Door
Replacements Portable
Radios.
Complete
a
project
that
has
been
underway
to
bring
all
radios
to
APCO
P25
compliance
for
 interoperability.
Requires
the
purchase
of
70
addi3onal
portable
radios
at
$3,000
each Volunteers
in
Service
to
Policing
Coordinator.
Crea3on
of
one
posi3on
to
coordinate
and
supervise
the
 Volunteers
in
Service
to
Policing
Program.
By
crea3ng
a
new
civilian
posi3on,
sworn
law
enforcement
resources
 would
be
freed
from
this
responsibility Community
Service
Officer

Burlington

VT

Public
Safety

Burlington

VT

Burlington Burlington














866,244
 












103,620
 












264,491
 












210,000

















60,000


1














120,000


2














120,000


2

Schools

Social
Service
Prac33oner
(Law
Enforcement
Support).
Crea3on
of
two
new
posi3ons
specializing
in
mental
 health
and
substance
abuse
interven3on
to
respond
during
the
ini3al
call/emergency.
A
collateral
effect
of
this
 program
would
be
to
reduce
the
nu Flynn
Elementary
School:
new
roof
and
insula3on














200,000


2

VT

Schools

Energy
efficiency
improvements
at
one
elementary
school
(Barnes)














750,000


9

VT

Schools

Hunt
Middle
School:
repair
failing
exterior
brick
walls












1,200,000


16

City

State

Program

Project
Descrip3on

Burlington

VT

Schools

Burlington

VT

Schools

Burlington

VT

Schools

Replace
1950s
boilers,
mechanical
HVAC
equipment
replacement
and
install
heat
recovery
roobop
units
at
one
 elementary
school
(Barnes) Wheeler
Elementary
School:
remove
exis3ng
univen3lators;
install
heat
recovery
units;
new
controls
and
 converters;
convert
exis3ng
steam
boilers
to
hot
water. Accessibility/ADA
improvements
at
one
elementary
and
one
middle
school
(Edmunds)

Burlington

VT

Schools

Burlington

VT

Schools

Burlington

VT

Streets/Roads

City
high
school
construc3on
and
improvements:
1964
auditorium
needs
to
be
updated
for
a
high
school
of
 1200
students;
various
code
viola3ons
addressed;
will
put
in
over
800
new
seats,
new
electrical,
new
ligh3ng,
 new
HVAC
systems;
ADA
accessibility Flynn
Elementary
School:
mechanical
HVAC
equipment
replacement;
replace
three
1950s
boilers
with
high
 efficiency
water
boilers;
install
heat
recovery
roobop
units;
remove
asbestos
insula3on;
install
new
controls Improving
access
to
Waterfront:Funicular
to
Waterfront

Burlington

VT

Streets/Roads

Burlington

VT

Burlington

Funding
Required

Jobs












1,400,000


19












1,330,000


19












1,500,000


20












1,500,000


20












1,720,000


23












2,500,000


30

Improving
access
to
Waterfront:
Bafery
Street
improvements












1,800,000


43

Streets/Roads

Improving
access
to
Waterfront:
Depot
Street
(from
North
Ave
to
Waterfront)
streetscape












2,000,000


48

VT

Streets/Roads












3,000,000


72

Burlington

VT

Streets/Roads

Other
major
thoroughfare
road
improvements:
Main
Street
improvements
between
St.
Paul
St
and
Winooski
 Ave Improving
access
to
Waterfront:
Site
work
at
the
Moran
Center
at
Waterfront
Park












4,000,000


96

Burlington

VT

Streets/Roads

Improving
access
to
Waterfront:
Parking
deck
in
Pease
Grain
lot












6,000,000


144

Burlington

VT

Streets/Roads












6,000,000


144

Burlington

VT

Streets/Roads












8,000,000


192

Burlington

VT

Streets/Roads










12,000,000


288

Burlington

VT

Transit

Other
major
thoroughfare
road
improvements:Winooski
Ave
improvements
between
Main
Street
and
Pearl
 Street Downtown
streetscape
improvement
on
the
side
streets
extending
from
outdoor
pedestrian
mall/Church
 Street Buildout
of
contract
2
for
Southern
Connector/Champlain
Parkway;
roadway
to
relieve
current
neighborhood
 traffic
impacts Installa3on
of
Intelligent
Transporta3on
System
for
transit
system

Burlington

VT

Transit

Purchase
of
12
clean
diesel
transit
buses

Burlington

VT

Transit

Construc3on
of
transit
shelters

Burlington

VT

Transit

Full
construc3on
of
Downtown
Transit
Center

Burlington

VT

Water

Water
Plant
Equipment/Instrumenta3on
Upgrade














350,000


8

Burlington

VT

Water

Combined
Sewer
Overflow
Reduc3on














750,000


18

Burlington

VT

Water

Water
Main
Replacement,
South
Cove
Road














750,000


18

Burlington

VT

Water

Mouth
of
the
River
Sewer
Project












1,000,000


24

Burlington

VT

Water

Winooski
River
Siphon
Crossing












1,700,000


42

Burlington

VT

Water

Main
Wastewater
Plant
Solids
Dewatering
Upgrade












2,000,000


48

Auburn

WA

Airport














121,000


12

Auburn

WA

Airport














120,000


15

Auburn

WA

CDBG

Resurface
the
25
yr
old
runway
at
Dick
Scobee
Aiprtport.
3rd
busiest
commuter
airport
in
the
Puget
Sound
 area.
This
is
an
enterprise
fund
owned
and
operated
by
the
City.
Project
ready
to
begin
in
90
days.
One
of
 lowest
average
income
ci3es
in
the
county. Security
Access/Fencing.
Dick
Scobee
Airport
is
an
enterprise
center
owned
and
operated
by
the
City.
This
is
 the
third
busiest
commuter
airport
in
the
Puget
Sound
region.
Project
ready
to
begin
in
90
days.
One
of
lowest
 average
income
ci3es
in
the
county

Auburn

WA

CDBG












1,125,000


11

Auburn

WA

CDBG














660,000


16

Auburn

WA

CDBG














240,000


22

Auburn

WA

CDBG














250,000


25

Auburn

WA

CDBG














850,000


28

Auburn

WA

CDBG














165,000


38

Auburn

WA

CDBG














210,000


44

Auburn

WA

CDBG












1,100,000


53

Auburn

WA

CDBG














364,000


60

Auburn

WA

CDBG














700,000


84

Auburn

WA

CDBG












4,300,000


95

Auburn

WA

CDBG










12,000,000


100

Auburn

WA

CDBG












5,000,000


100

Auburn

WA

CDBG












1,900,000


112

Arterial
Guardrail
and
Clearzone
Improvement
Project.

One
of
lowest
average
income
ci3es
in
the
county.
This
 project
has
been
through
the
plannng
process
and
is
ready
and
can
start
within
90
days. Backup
Bafery
System
City
Traffic
Signals
for
public
safety.One
of
lowest
average
income
ci3es
in
the
 county.This
project
is
ready
and
can
start
within
90
days. Fund
four
hybrid
Parks
shufles
for
access
for
youth
to
the
gym,
commununity
center,
YMCA
and
other
 facili3es.
Purchase
of
the
vehicles
allows
the
Parks
Department

to
program
facili3es
and
provide
for
addi3onal
 city
staff
at
city
sites
and
allows
othe Channeliza3on
Project
at
M
St
SE.
This
project
re‐arranges
a
key
intersec3on
in
a
core
area
of
the
city
and
 means
an
immediate
traffic
improvement
to
our
downtown
and
community
college.
Project
fully
designed
and
 ready
to
proceed
in
90
days. Replace
the
1973
HVAC
system
and
ligh3ng
at
City
Hall
with
green
technology
including
sensors,
natural
 ligh3ng
and
LEED
features.
This
project
is
fully
designed
and
ready
to
start
start
within
90
days 15th
Street
SW
Repair
Truck
corridor.
This
project
is
fully
designed
and
ready
to
begin
in
90
days.
One
of
lowest
 average
income
ci3es
in
the
county. West
Main
Street
Truck
Corridor
Deep
Repair.
This
Project
is
fully
designed
and
ready
to
begin
in
90
days.
One
 of
lowest
average
income
ci3es
in
the
county. West
Valley
Highway
Repair
Truck
Corridor.This
project
is
fully
designed
and
ready
to
begin
in
90
days.
One
of
 lowest
average
income
ci3es
in
the
county. "I"
Street
NE
Truck
Corridor
Deep
Repair.
Project
is
fully
designed
and
ready
to
begin
in
90
days.
This
is
a
key
 north/south
truck
corridor
in
the
heart
of
the
largest
industrial
and
manufacturing
center
in
the
Pacific
 Northwest. West
Valley
Highway
Truck
Corridor
Deep
Repair.This
project
connects
both
the
Tacoma
and
Seafle
ports
 districts
through
the
heart
of
the
largest
industrial
and
manufacuturing
district
in
the
Pacific
Northwest.Project
 fully
designed
and
ready
to
begin
in
 Les
Gove
Improvement
Project.
Improves
roads,
sewer,
storm
and
water
systems
in
a
six
block
area.
This
 project
is
fully
designed
and
ready
to
start
start
within
90
days.Includes
adding
1.3
miles
of
water
mains,
 abandoning
and
replacing
clay
pipes,
adding
 Auburn
Community
Center
project
creates
a
large
gathering
space
for
community
educa3on,tourism
and
 recrea3on.
Plans
are
complete.
ready
to
bid
and
ready
to
start
in
90
days Auburn
Teen
Center
&
Gym
for
area
youths.
This
is
for
a
community
in
transi3on
with
lower
income
families.
 One
method
to
prevent
gangs
from
coming
into
area.Project
on
hold
with
economy.Plans
are
complete.
Ready
 to
bid
and
can
start
in
90
days Arterial
Crack
Sealing
Program
that
seals
cracks
on
65
miles
of
arterial
streets
and
70
miles
of
local
streets
in
a
 century
old
city
with
one
of
the
lowest
average
incomes
in
county.
This
project
is
fully
designed
and
ready
and
 can
start
within
90
days.












3,000,000
 










4,000,000
 












500,000


12










10,000,000


240

City

State

Program

Auburn

WA

CDBG

Auburn

WA

CDBG

Auburn

WA

CDBG

Auburn

WA

CDBG

Auburn

WA

CDBG

Auburn

WA

CDBG

Auburn

WA

Energy

Auburn

WA

Energy

Auburn

WA

Energy

Auburn

WA

Public
Safety

Auburn

WA

Public
Safety

Auburn

WA

Public
Safety

Auburn

WA

Public
Safety

Auburn

WA

Public
Safety

Auburn

WA

Schools

Auburn

WA

Auburn

Project
Descrip3on Harvey
&
8th
St
NE
improvements
for
addi3onal
lanes
for
safety
including
new
sewer.
This
is
a
century
old
 industrial
city
and
this
intersec3on
is
vital
to
traffic
connec3ng
the
hillside
with
the
downtown
community.
This
 project
is
fully
designed
and
re B
Street
NW
Corridor
Deep
Repair
Truck
Corridor.
This
project
located
in
the
heart
of
the
largest
industrial,
 manufacturing,
warehouse
districts
in
the
Pacific
Northwest.
Project
is
fully
designed
and
ready
to
begin
in
90
 days. Historic
Post
Office
renova3on
to
neighborhood
center
and
visitor
center.
1920's
post
office
recently
vacated
 by
the
county
is
ready
for
redevelopment
next
to
city
owned
an
operated
live
theater
in
the
heart
of
an
historic
 downtown
in
one
of
the
lowest
a Jacobson
Community
Park
to
develop
30
acre
park
and
sports
complex.
Area
in
transi3on
with
low
income
city. Downtown
Public
Parking
for
private
sector
transit
oriented
development.
City
has
accumulated
six
blocks
of
 property
over
six
years
to
encourage
downtown
redevelopment
in
a
century
old
industrial
city
with
one
of
the
 lowest
average
incomes
in
the
county. City
Plaza
enhancement
and
Main
Street
four
block
Promemade.
Projects
are
designs
and
reconfigure
the
plaza
 at
city
hall
for
more
pedestrian
use
as
well
as
events
with
the
Promenade
going
the
length
of
a
four
block
re‐ development
project
in
the
heart
of
a Green
Jobs
replace
all
traffic
signals
with
LED
lamps.
This
city
is
one
of
the
lowest
average
income
ci3es
in
the
 county.
This
project
is
ready
and
can
start
within
90
days. Streetlight
replacement
purchase
and
install
2,200
LED
streetlights
throughout
city
to
reduce
ci3zen
costs
by
 up
to
50%.
This
project
is
ready
and
can
start
within
90
days. Auburn
Environmental
Park
LEED
Silver
Interpre3ve
Center
and
Na3ve
Plants
Greenhouse.
The
City
created
an
 environmental
park
from
a
wetland
area
next
to
downtown
and
then
took
the
further
step
of
crea3ng
a
Green
 Development
zone
around
it.
Council
is
c Two
School
Resource
Officers Fiber
Op3c
connec3on
to
911
system.
Project
ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in
 the
county.
This
is
a
century
old
city
afemp3ng
to
update
communica3ons. Fiber
Op3c
Connec3on
to
borders
of
an
adjoining
City
of
Federal
Way

Funding
Required

Jobs












2,225,000


112












2,900,000


128












3,000,000


138












7,000,000


210










30,000,000


250










10,000,000


512














300,000


20












3,500,000


100












6,000,000


192














150,000


2














500,000


21














500,000


21














500,000


21












1,200,000


45














708,940


35

Schools

Video
surveillance
for
Project
ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in
the
county.City
 u3li3es
including
the
water
system
for
a
century
old
city. Fiber
Op3c
connec3on
to
the
hub
of
the
ci3es
of
Auburn,Algona,Pacific.
This
connec3on
includes
the
area
 covered
by
the
Auburn
School
District
and
gives
us
the
ability
to
work
to
connect
the
school
sites
within
the
 district.Project
ready
to
begin
in
90 Auburn
High
School
remodel
of
the
1,100
seat
Performing
Arts
Center,
largest
of
its
kind
outside
of
Seafle
 center. Underground
fuel
tank
removals
at
schools
in
century
old
city














464,898


40

WA

Schools

Auburn
Memorial
Stadium
football/soccer
field
field,
ligh3ng,
scoreboard
and
stadium
improvements












1,558,767


42

Auburn

WA

Schools

Interior
Ligh3ng
improvements
and
Sensor
ligh3ng
controls












1,670,707


48

Auburn

WA

Streets/Roads












1,100,000


81

Auburn

WA

Transit










30,000,000


300

Auburn

WA

Water












4,170,000


160

Bellevue

WA

CDBG












3,500,000


97

Bellevue

WA

Streets/Roads














600,000


29

Bellevue

WA

Streets/Roads












3,200,000


30

Bellevue

WA

Streets/Roads












1,000,000


31

Bellevue

WA

Streets/Roads














750,000


37

Bellevue

WA

Streets/Roads












1,000,000


57

Bellevue

WA

Streets/Roads












4,200,000


110

Bellevue

WA

Streets/Roads












2,600,000


111

Bellevue

WA

Streets/Roads












3,800,000


189

Bellevue

WA

Water












1,200,000


19

Bellevue

WA

Water












1,250,000


37

Bremerton

WA

Streets/Roads

ITS
Improvement
to
10
traffic
signal
intersec3ons
to
traffic
management
center.
Project
is
fully
designed
and
 ready
to
begin
in
90
days.
One
of
lowest
average
income
ci3es
in
the
county. Downtown
Public
Parking
Garage
for
private
sector/public
partnership
Transit
Oriented
Garage.
This
is
located
 next
to
a
transit
hub
for
two
coun3es
and
used
by
three
different
bus
agencies,
commuter
rail
and
available
for
 AMTRAK.City
owns
to
the
land,
ha R
St
SE
U3lity
Improvements
storm
drainage,
water
and
sanitary
sewer
infrastructure
and
rebuild
of
the
 disturbed
street
pavement
on
an
arterial
of
the
city
that
includes
a
major
park,
mobile
home
park
and
a
 connec3on
with
all
communi3es
to
the
east
of
 Mercer
Slough
Environmental
Educa3on
Center
Comple3on
‐
construct
second
classroom
in
a
facility
dedicated
 to
study
of
wetland
ecology,
water
quality
and
environmental
sustainability.

Facility
is
a
partnership
between
 City,
Pacific
Science
Center
and
P 123rd
Avenue
SE
Sidewalk
‐
Construct
new
curb,
gufer
and
sidewalk
‐
provides
pedestrian
protec3on
and
 neighborhood
access 120th
Ave
NE
‐
widen,
add
turn
lanes,
mul3‐modal
improvements
(bike
lanes
and
sidewalks).

Poten3al
to
 improve
stormwater
quality
through
natural
drainage
prac3ces.

Connects
downtown
Bellevue
to
Bel‐Red
area
‐
 major
redevelopment
plan,
with
es3mates 148th
Ave
Intersec3on
Safety
and
Reliability
‐
improvements
to
four
signalized
intersec3ons
which
will
increase
 safety
and
reliability
on
a
high‐volume
arterial. 116th
Avenue
SE
Sidewalk
‐
Construct
curb,
gufer
and
sidewalk
‐
provides
safe
walking
route
for
elementary
 students
and
pedestrian
protec3on. Priority
Arterial
Overlay
‐
comple3on
of
preserva3on
work
and
ADA
retrofits
along
Bellevue
Way.

Would
 improve
car
travel
and
non‐motorized
travel
for
residents
along
principle
City
arterial. West
Lake
Sammamish
Parkway
‐
improvements
to
regional
connector
‐
roadway,
non‐motorized
and
natural
 environment.

Will
result
in
safety
and
water
quality
improvements. NE
2nd
Street
Enhancements
‐
widen
and
incorporate
urban
design
elements
for
pedestrians.

Will
be
 coordinated
with
parks
development.

Will
provide
needed
improvements
for
major
growth
expected
in
 downtown
Bellevue.

Bike
route,
traffic
flow
and
accident Northup
Way
Corridor
‐
improvements
to
roadway
to
add
center
turn
lane,
sidewalk,
bike
lane,
traffic
calming
 and
pedestrian
crossings. Sanitary
Sewer
Trunk
Rehabilita3on
‐
repair
por3ons
of
sewers
where
serious
structural
defects
have
been
 found
and
there
is
a
high
likelihood
of
failure.

Would
decrease
risk
to
community
and
environment. Asbestos
Cement
Water
Main
Replacement
Project
‐
replace
undersized
and
aging
water
mains
that
represent
 a
risk
to
public
safety,
health
and
the
environment. SAFE
ROUTES
TO
SCHOOLS
‐
Provide
necessary
sidewalks
on
primary
routes
to
elementary
schools.












1,000,000


13

Bremerton

WA

Streets/Roads












2,500,000


33

Bremerton

WA

Streets/Roads

11TH
AND
WARREN
AVENUE
IMPROVEMENTS
‐
Reconstruct
intersec3on
with
high
conges3on
and
accident
 history. STREET
PAVING
‐
re‐pave
all
substandard
City
Streets
that
have
failing
pavement.












4,000,000


53

Bremerton

WA

Streets/Roads

SHELDON/PACIFIC
AVE
IMPROVEMENTS
‐
Reconstruct
failing
roadway
and
associated
u3li3es
to
support
 redevelopment












8,200,000


131

City

State

Program

Bremerton

WA

Streets/Roads

Bremerton

WA

Water

Bremerton

WA

Water

Bremerton

WA

Water

Bremerton

WA

Water

Bremerton

WA

Water

Brewster Brewster Brewster Brewster Brewster Bridgeport Bridgeport Bridgeport Cle
Elum

WA WA WA WA WA WA WA WA WA

Streets/Roads Streets/Roads Streets/Roads Streets/Roads Water Water Water Water Water

Colville

WA

CDBG

Colville

WA

CDBG

Colville

WA

Colville

Project
Descrip3on PARKING
GARAGE
‐
construct
parking
garage
in
the
central
business
district
to
reduce
traffic
conges3on
from
 on‐street
parking,
and
leverage
exis3ng
and
planned
re‐development
projects. REPLACE
FAILING
SANITARY
SEWER
LATERALS
‐
Install
maintenance
access
piping,
inspect
and
repair
or
replace
 failing
sanitary
sewer
laterals.

The
proposed
construc3on
will
reduce
groundwater
inflow
into
the
sanitary
 sewer
resul3ng
in
lower
system
opera3 REPLACE
AND
IMPROVE
CRITICAL
WATER
SYSTEM
INFRASTRUCTURE
‐
replace
exis3ng
substandard
and/or
 failing
water
system
infrastructure
to
improve
water
service
and
quality. REROUTE
CREEK
AWAY
FROM
LANDFILL
‐
Reroute
Gorst
Creek
(cri3cal
salmon
habitat,
and
an
emergency
 drinking
water
source)
away
from
a
failing
landfill
that
contains
toxic
materials
including
commercial
and
 medical
wastes.

The
creek
currently
is
conveyed
t GORST
SEWERAGE
‐
construct
sewer
collec3on
system
in
an
area
iden3fied
as
a
chronic
environmental
and
 public
health
problem
due
to
failing
on‐site
sewage
systems.

The
project
addi3onally
will
implement
Total
 Maximum
Daily
Load
thresholds
by
reducing
f AIRPORT
SEWER
MAIN
‐
construct
trunk
sanitary
sewer
to
convey
flow
from
South
Kitsap
Industrial
Area
and
 Olympic
View
Industrial
Park
to
exis3ng
City
Collec3on
system.

Sewerage
will
open
up
500‐Acres
for
Industrial
 Development Reconstruc3on
and
extension
of
6th
Street Riverview
Heights
Roadway
Construc3on Pavement
Preserva3on;
Repair
and/or
overlay
streets Replacement
of
1000
LF
of
failing
sidewalk Water
main
replacement;
Add
new
meters
and
hydrants 8"
water
main
extension.

9th
Street;
Foster
Avenue
to
Columbia
Avenue 8"
water
main
extension.

Tacoma
Avenue;
14th
to
16th
Streets Domes3c
well
including
drilling,
well
house,
pump,
motor,
and
1000
LF
of
12”
water
line East
End
Sewer
Extension,
extension
of
sewer
to
approximately
65
acres
of
developable
land
within
the
City
 Limits Fire
Sta3on
‐
Replace
exis3ng,
outdated
Fire
Sta3on

Funding
Required

Jobs












8,000,000


164












1,000,000


20












5,000,000


98












6,000,000


118












6,000,000


502










13,000,000
 














29,000
 














40,000
 












277,000
 












339,000
 














78,000
 














80,500
 












160,000
 












390,000


2168 5 5 6 7 5 5 6 8












1,200,000


24












2,500,000


6










10,000,000


200

Streets/Roads

Colville
Public
Library
Addi3on
and
Redesign
will
expand
and
update
the
exis3ng
city
library
with
green
 construc3on
thus
improving
collec3on
capacity
and
technology
capabili3es,
as
well
as
providing
coummunity
 space
for
mee3ngs,
educ3on,
educa3on 3rd
Ave
Reconstruc3on
‐
Reconstruct
street
to
extend
SR20
to
truck
route












1,400,000


10

WA

Streets/Roads

Pavement
Preserva3on
‐
Repair
and
reconstruct
all
deteriorated
streets












8,000,000


12

Colville

WA

Streets/Roads

Hawthorne
Reconstruc3on
‐
Reconstruct
deteriorated
street.
Pavement,
curbs,
water
&
Sewer












4,900,000


15

Colville

WA

Streets/Roads

Evergreen
Way
New
Construc3on
‐
Construct
new
street
to
connect
SR20
to
SW
city
limits












3,800,000


18

Colville

WA

Water

Sewer
Replacement
‐
Replace
deteriorated
and
leaking
sewer
lines












5,000,000


15

Colville

WA

Water












9,900,000


15

Colville

WA

Water

Waterline
Replacement
&
New
Reservoir
Construc3on
‐
Replace
deteriorated
waterlines
and
construc3on
new
 1
mill
gal
reservoir Water
and
sewer
upgrades.

Replace
approximately
6500
lineal
feet
of
60
year
old
water
and
sewer
lines.

 Overlay
roadways
on
comple3on












2,450,000


49

Creston

WA

Streets/Roads

Sidewalk
Safety
Replacement;

School
zone,
storm
drainage,
and
ADA
Compliance














200,000


5

Creston

WA

Water

Water
Main
Replacement;

4000
LF
of
pipe
throughout
town.

Replacement
is
a
high
priority
for
fire
 suppression
by
the
Washington
State
Dept
of
Health














840,000


17

Edmonds

WA

Streets/Roads














300,000


2.9

Edmonds

WA

Streets/Roads












1,700,000


6

Edmonds

WA

Streets/Roads












2,800,000


15.1

Edmonds

WA

Streets/Roads












1,000,000


16.9

Edmonds

WA

Water














275,000


3.4

Edmonds

WA

Water














530,000


6.1

Edmonds

WA

Water

Everef

WA

CDBG

Downtown
Street
Ligh3ng
and
Sidewalk
Replacement.

Install
street
ligh3ng
and
new
sidewalks
to
 improvement
safety. Annual
Asphalt
Overlay
Maintenance
Contract. This
project
is
the
annual
overlay
maintenance
contract
for
City
streets.

The
project
budget
is
based
on
a
 20year
life
cycle. 75th/76th
Walkway
&
162nd
Street
Park
Project.

Construct
a
walkway
on
76th
Avenue
West/75th
Place
West
 between
Meadowdale
Beach
Road
and
Meadowvale
County
Park
the
south
side. Caspers/Ninth
Avenue/Puget
Drive
Walkway.

Construct
a
walkway
on
the
north
side
of
Caspers
Street
 between
3rd
Avenue
North
&
9th
Avenue
North
on
the
west
side
of
9th
Avenue
North
between
Caspers
Street
 and
Puget
Drive
&
the
north
side
of
Puget
Drive
from Olympic
View
Drive
w/Lynnwood,
Phase
II.

Install
new
8"
duc3le
iron
pipe
water
main,
fire
hydrants
and
 associated
appurtenances
in
areas
along
Olympic
View
Drive,
in
conjunc3on
with
street
improvements
to
be
 constructed
on
Olympic
View
Drive
by
the
Cit BNSF
U3lity
Work.

BNSF
is
requiring
the
City
to
protect
its
sewer,
water
and
storm
crossings
within
the
BNSF
 right
of
way
to
accommodate
the
installa3on
of
a
second
track. 93rd/96th
Drainage
Improvements.

Install
new
storm
collec3on
system
to
serve
the
major
low
areas
and
 connected
to
Edmonds
Way
trunk
storm
drain. Lions
Park
Renova3on

Everef

WA

Housing

Everef

WA

Everef














525,000


9.1












1,000,000


75

CHIP
Program














250,000


10

Housing

Habitat
for
Humanity
Housing














300,000


12

WA

Housing

ARTSPACE
Housing












5,000,000


100

Everef

WA

Public
Safety

Fiber
Op3c
Network












1,390,000


40

Everef

WA

Schools

Artspace
Educa3on
Center












2,000,000


75

Everef

WA

Streets/Roads

ITS/Signal
Improvements










13,000,000


25

Everef

WA

Streets/Roads

Pavement
Overlay












3,000,000


30

Everef

WA

Water

Bond
Street
Combine
Sewer
Overflow










25,000,000


60

Fife

WA

CDBG














250,000


5

Fife

WA

Streets/Roads














180,000


8

Fife

WA

Streets/Roads

Swim
Center:
replacement
of
25‐year‐old
air
handler,
condensing
unit,
and
domes3c
water
heater,
including
 installa3on
of
roof
scufle. 70th
Avenue
East,
20th
Street
East
to
North
City
Limits
‐
pavement
preserva3on,
including
grind,
overlay,
and
 u3lity
adjustments
to
1,200
feet
of
2‐lane
arterial Pacific
Highway
East
(Old
99)
Alexander
Avenue
to
Willow
Road
‐
Pavement
preserva3on
including
grind,
 overlay,
and
u3lity
adjustments
for
2,000
feet
of
5‐lane
arterial














300,000


13

City

State

Program

Fife

WA

Streets/Roads

Project
Descrip3on

Fife

WA

Streets/Roads

Fife

WA

Streets/Roads

Fife

WA

Streets/Roads

Fife

WA

Water

Fife

WA

Water

Fife

WA

Water

Kefle
Falls

WA

Energy

Kefle
Falls Kefle
Falls Kefle
Falls

WA WA WA

Streets/Roads Streets/Roads Streets/Roads

Kefle
Falls
Public
Library
Addi3on
and
Redesign;
Expand
and
update
with
green
construc3on
improving
 collec3on
capacity,
technology
capabili3es,
providing
community
space
for
mee3ngs,
educa3on,
and
business
 development.
 East
10th
Ave
Reconstruc3on Meyers
Street
Resurfacing US
395
Northside
Pedestrian
Improvements;

Sidewalk,
defined
access
points,
and
storm
drainage

Kefle
Falls Kefle
Falls

WA WA

Streets/Roads Water

Pavement
Preserva3on:
various
streets Wastewater
Treatment
Facility,
Replace
exisi3ng
failing
lagoon
system
with
a
Treatment
Facility

Kirkland

WA

CDBG

116th
Ave
NE
Rural
Low
Impact
Development
project

Kirkland

WA

CDBG

Kirkland

WA

Kirkland

Pacific
Highway
East
(Old
99)
Port
of
Tacoma
Road
to
West
City
Limits
‐
Pavement
preserva3on,
including
grind,
 overlay
and
u3lity
adjustments
for
3,200
feet
of
5‐lane
arterial 54th
Avenue
East,
Pacific
Avenue
East
to
North
City
Limits
‐
Pavement
preserva3on,
including
grind,
overlay,
 and
u3lity
adjustments
for
5,000
feet
of
5‐lane
arterial 70th
and
Valley
Corridor,
including
widening
5,000
feet
of
Valley
Avenue
from
2
to
4
lanes
and
1,000
feet
of
 70th
Avenue
from
2/3
to
5/6
lanes 70th
and
Valley
Corridor:
70th
Avenue
grade
separa3on,
a
4‐lane
bridge
over
the
Union
Pacific
Railroad 12‐inch
main
replacement
‐
500
feet
of
new
duc3le
iron
pipe
to
replace
corroded
cast
iron
pipe
in
casing
under
 I‐5,
just
west
of
54th
Avenue
East Sewer
pump
sta3on
upgrades,
including
15
pumps,
an
odor
control
system,
and
two
generator
sets,
at
a
total
 of
8
pump
sta3ons Inter3e
at
Puyallup
service
territory
boundary,
including
3,000
feet
of
12‐inch
water
main
and
pump
sta3on

Funding
Required

Jobs














550,000


22














820,000


32












3,600,000


260










25,000,000


500














160,000


6














214,000


8














980,000


20












1,100,000
 












150,000
 












160,000


22 6 6














600,000
 












678,000


12 14










10,000,000


200














800,000


30

Stream
enhancements/fish
crossing
of
Yarrow
Creek
at
116th
Ave
NE














750,000


30

CDBG

Juanita
Beach
Park
improvements














500,000


50

WA

CDBG

Urban
Pedestrian
Corridor
‐
Low
Impact
Development












1,000,000


50

Kirkland

WA

Streets/Roads

116th
Ave
NE
Bike
and
Pedestrian
Facil3es












4,000,000


50

Kirkland

WA

Streets/Roads

116th
Ave
NE
Non‐Motorized
facili3es

Kirkland

WA

Streets/Roads

Kirkland

WA

Kirkland

WA

Kirkland














900,000


50

124th
Ave
NE
Roadway
Expansion












4,000,000


200

Streets/Roads

NE
120th
Street
Extension












3,000,000


1200

Transit

Downtown
Transit
Center/Park
Lane
Pedestrian
Corridor
project














700,000


50

WA

Water

Third
Street
Water
Main
replacement














120,000


40

Kirkland

WA

Water

North
Reservoir
Seismic
Upgrades

Lakewood

WA

CDBG

Lakewood

WA

Lakewood

WA

Lakewood












1,400,000


50

Street
ligh3ng
















25,000


0.5

CDBG

Affordable
housing
&
physical
improvements
















70,000


1

CDBG

Site
planning
&
improvements
at
Ward's
Lake
Park
















50,000


1

WA

CDBG

Emergency
minor
home
repair














190,000


3

Lakewood

WA

CDBG

Major
home
repairs














150,000


3

Lakewood

WA

CDBG

Energy
Conserva3on
Tillicum
Neighborhood














250,000


5

Lakewood

WA

CDBG

North
American
Lake
Park
boat
launch
(uplands
area)














450,000


8

Lakewood

WA

CDBG

Develop
two
neighborhood/school
parks














600,000


11

Lakewood

WA

CDBG

Harry
Todd
Park
Americans
with
Disabili3es
Act
upgrades

Lakewood Lakewood

WA WA

CDBG CDBG

Americans
with
Disabili3es
improvements
&
fishing
pier
at
American
Lake
Park
(north) Repair/remodel
historic
Fort
Steilacoom
Park
barns












1,000,000
 










1,300,000


18 22












1,700,000


30

Lakewood

WA

Public
Safety

Crash
Data
Retrieval
(CDR)
System

















6,000


0

Lakewood

WA

Public
Safety

360
degree
crime
scene
scanner














100,000


1

Lakewood

WA

Public
Safety

Fire
suppression
training
captain














130,000


1

Lakewood

WA

Public
Safety

One
addi3onal
code
enforcement
officer














111,605


1

Lakewood

WA

Public
Safety

Communica3ons
offcier














240,000


2

Lakewood

WA

Public
Safety

Radio
technician














220,000


2

Lakewood

WA

Public
Safety

Smartlink
radio
communica3on
system












6,784,428


3

Lakewood

WA

Public
Safety

Funds
to
perform
abatements
&
remove
blighted
buildings














400,000


8

Lakewood

WA

Public
Safety

Police
department
gun
range














663,500


11

Lakewood

WA

Public
Safety

Regional
fire
training
tower
w/apparatus
bay












4,691,153


83

Lakewood

WA

Public
Safety

Regional
combined
communica3ons
center










14,450,272


260

Lakewood

WA

Schools

District‐wide
facili3es
master
planning














158,750


13

Lakewood

WA

Schools

Military
schools
planning
&
design












1,604,200


41

Lakewood

WA

Schools

Hor3cultural
small
capital
projects










13,875,000


70

Lakewood

WA

Schools

Demolish
A/I
school












5,000,000


100

Lakewood

WA

Schools

Specialized
facili3es
project
studies












1,154,500


120

Lakewood

WA

Schools

Electrical
small
capital
projects












3,750,000


148

Lakewood

WA

Schools

Mechanical
small
capital
projects










11,900,000


200

Lakewood

WA

Schools

Upgrade
Lochburn
Middle
School










20,000,000


200

Lakewood

WA

Schools

Lakes
High
School
reconstruc3on










22,313,000


332

Lakewood

WA

Schools

Structural
small
capital
projects










13,790,000


447

Lakewood

WA

Schools

Upgrade
Hudtloff
Middle
School










65,000,000


800

Lakewood

WA

Schools

Construct
new
elementary/middle
school
to
replace
Oakbrook
&
Southgate










75,000,000


1000

Lakewood

WA

Streets/Roads

Steilacoom
Boulevard
SW
sidewalk
project














525,000


9

Lakewood

WA

Streets/Roads

Resurface
Waughop
Lake
Road
at
Fort
Steilacoom
Park












1,000,000


18

Lakewood

WA

Streets/Roads

100th
Street
SW
improvements
(Gravelly
Lake
Drive
SW
to
59th
Avenue
SW)












2,000,000


36

Lakewood

WA

Streets/Roads

Update
the
City's
an3quated
traffic
signal
controllers












2,250,000


39

Lakewood

WA

Streets/Roads

Pacific
Highway
SW
street
improvements
‐
phase
4












3,500,000


63

City

State

Program

Lakewood

WA

Streets/Roads

Bridgeport
Way
SW
street
improvement
projects

Project
Descrip3on

Funding
Required 










5,700,000


Jobs 100

Lakewood

WA

Streets/Roads

Lakewood

WA

Transit

Pavement
rehabilita3on
&
street
overlay
projects
‐
various
loca3ons












5,400,000


100

Commuter
pedestrian
bridge
at
the
Lakewood
Sta3on












5,000,000


Lakewood

WA

90

Transit

D
&
M
Street
railroad
bridge








150,000,000


2700

Lakewood Lakewood

WA

Water

Tillicum
Neighborhood
side
sewer
connec3ons














250,000


4

WA

Water

Fort
Steilacoom
Park
sewers












1,000,000


18

Lakewood

WA

Water

Public
works
maintenance
yard












1,000,000


18

Lakewood

WA

Water

Tillicum
neighborhood
water
main
installa3on












1,000,000


18

Lakewood

WA

Water

Increasing
water
pressure
zone
on
east
side
of
City












1,300,000


23

Lakewood

WA

Water

Springbrook
Neighborhood
water
main
bore
project












1,500,000


27

Lakewood

WA

Water

American
Lake
Gardens/Tillicum
sanitary
sewers












9,000,000


162

Leavenworth

WA

Water

South
Wastewater
Interceptor
Replacement;
18"
‐
2200
LF












1,200,000


24

Longview

WA

Streets/Roads

City
Street
Rehabilitaion
Program:
Repair
of
seriously
compromised
city
streets.












3,000,000


40

Longview

WA

Streets/Roads












3,000,000


40

Longview

WA

Streets/Roads

Columbia
Hieghts
Repavemant:
Heavily
u3lized
road
including
school
bus
route
with
no
sidewalks,
drainage
or
 crosswalks. Weber
Ave
Extension:
Opening
Phase
II
of
Industrial
Park.

Marcus Mafawa Mafawa Mafawa Mafawa Mafawa Mafawa Mafawa Mafawa Mafawa Mafawa Moses
Lake

WA WA WA WA WA WA WA WA WA WA WA WA

CDBG Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads Streets/Roads

Heritage
Gateway
and
Town
Hall
Improvements Selkirk
Avenue
Overlay South
Boundary
Overlay North
Portage
Avenue
overlay Fourth
Street
overlay Government
Road
water
distribu3on
improvements South
Riverview
Avenue
overlay South
William
Avenue
overlay Saddle
Mountain
Drive
overlay First
Street
overlay Reconstruc3on
of
Government
Road Downtown
Streets
Safety
Impreovements:

Widen
streets,
sidewalks,
and
improve
pedestrian
routes












2,000,000
 












700,000
 












220,797
 












220,797
 












151,234
 












182,660
 












200,000
 












203,250
 












234,107
 












243,633
 












363,756
 










2,218,670


240 14 4 4 6 7 8 8 9 10 15 44












2,500,000


50

Moses
Lake

WA

Streets/Roads

Reconstruc3on
of
Lakeside
Drive
and
Peninsula
Road;
includes
water,
sewer,
storm
drainage,
and
ac3vity
trail.












3,000,000


60

Moses
Lake

WA

Water

Mae
Valley
Sewer
Extension:

New
service
area,
increase
urban
density,
and
remove
exis3ng
sep3c
systems












1,000,000


20

Moses
Lake

WA

Water












2,000,000


40

Northport

WA

CDBG

Okanogan Okanogan Pacific

WA WA WA

Water Water CDBG














500,000
 










2,600,000
 










3,055,496


10 52 61














600,000


17

Pacific

WA

CDBG












3,000,000


25

Pacific

WA

CDBG












3,500,000


35

Pacific

WA

CDBG












5,000,000


85

Pacific

WA

Water

Cascade
Valley
Water
and
Sewer
extension;
New
service
area,
new
residentail
development,
eliminate
private
 wells
and
sep3c
systems Northport
Community
Center
Building
Project
will
construct
a
mul3‐purpose
community
space
that
will
house
 ten
public
computers
with
high‐speed
internet
connec3ons,
library
services,
a
distance
educa3on
center,
 employment
center,
business
incubator,
and Rodeo
Trail
Road
U3li3es;
Add
domes3c
water,
fire
suppression,
and
sewer Elmway
Water
&
Sewer
Extension Pacific
Skateboard
Project.
This
project
willl
create
a
unique
skateboard
park
for
"ci3zens"
in
Pacific
and
3
 surounding
Low
Income
communi3es.
The
City
proposes
to
construct
improvements
in
2009,
all
plans
and
 specs
are
substan3ally
complete. West
Valley
Highway
Repair.
This
project
entails
deep
patch
work,
pedestrian
improvements
and
overlay
for
 City's
por3on
of
this
major
trucking
route
from
Seafle
to
Tacoma. Pacific
Street
Repairs.
This
project
will
entail
deep
pavement
restora3on
to
the
City
of
Pacific's
7.1
center
lane
 miles
of
arterial
roads.
Addi3onally,
the
City
will
perform
pavement
overlays
to
its
local
street
network
that
is
 rated
as
41
on
a
Pavemen Stewart
Road
Widening.
This
project
will
widen
the
exis3ng
2‐lane
roadway
to
a
con3nuous
4‐lane
roadway
 with
a
two‐way
leb
turn
lane.

Improvements
include
a
new
signal
at
Thornton
Avenue,
upgrade
of
the
exis3ng
 signal
at
Valen3ne
Road,
signal
interc Pacific
Wastewater
Pump
Sta3on
Repairs.
The
City
provides
water
water
collec3on
services
that
has
4
pumping
 sta3ons
that
are
failing.
The
project
will
seal
all
pump
sta3ons,
provide
new
pumps
and
electrical
equipment.














450,000


22

Pacific

WA

Water












1,000,000


25

Redmond

WA

Streets/Roads












1,000,000


10

Redmond

WA

Streets/Roads












1,800,000


10

Redmond

WA

Streets/Roads










13,000,000


87

Redmond

WA

Streets/Roads










14,500,000


198

Renton

WA

CDBG














775,000


14

Renton

WA

CDBG












1,000,000


35

Renton

WA

CDBG












5,000,000


175

Pacific
Water
System
Repairs.
The
City
provides
potable
water
for
6225
ci3zens
and
350
businesses.
This
 project
will
replace
a
significant
por3on
of
the
City's
southern
water
system,
plans
and
specifica3ons
are
in
 place
to
bid
this
work
in
April
2009. 2.

East
Lake
Sammamish
Parkway
Rehabilita3on
Project:

The
roadway
concrete
panels
have
deterioated
and
 sefled
from
many
years
of
heavy
use
crea3ng
an
uneven
driving
surface
decreasing
safety
and
increasing
 maintenance.

The
pavement
has
exceeded
its 3.

2009
Redmond
Street
Rehabilita3on
project:

Repair
and
provide
a
new
asphalt
pavement
surface
on
four
 miles
of
City
of
Redmond
streets.

Redmond's
Pavement
Management
Program
has
priori3zed
the
pavement
 condi3on
of
all
of
Redmond's
streets
and
iden 4.
Cleveland
St.
Improvement
Project:

The
roadway
improvements
include
traffic
calming
elements
such
as
 curb
extensions,
wider
sidewalks,
urban
and
pedestrian
ameni3es,
new
storm
drainage
system,
new
signals
 and
roadway
illumina3on. 1.

NE
36th
St.
Bridge:

Construc3on
of
a
bridge
over
SR
520,
including
one
through
lane
in
each
direc3on,
turn
 lanes,
bike
lanes,
sidewalks
and
intersec3on
improvements
on
each
end.

The
bridge
reduces
the
distance
to
 cross
SR
520
from
two
miles
to
.2 Downtown
Renton
Wayfinding
Ini3a3ve
‐
This
project
will
construct
and
install
a
system
of
signage,
gateways,
 and
kiosks
to
highlight
des3na3ons
and
guide
visitors
into
and
around
Downtown
Renton.

The
system
 enhances
the
revitaliza3on
efforts
of
Rent Barrier
Free
Sidewalk
Project
‐
The
project
will
construct
several
sidewalks
that
support
the
City’s
effort
to
 improve
pedestrian
facili3es
that
are
within
the
local
street
network
into
conformity
with
provisions
contained
 in
the
federal
Americans
with
D Street
Overlay
and
Rehabilita3on
Project
‐
This
project
will
provide
asphalt
concrete
resurfacing
of
city
streets
 and
rehabilita3on
of
arterials
that
are
cri3cal
to
movement
of
freight
within
and
through
the
City.

City

State

Program

Renton

WA

CDBG

Project
Descrip3on

Renton

WA

Streets/Roads

Renton

WA

Transit

Renton

WA

Water

Riverside

WA

CDBG

Seafle

WA

Amtrak

Seafle

WA

Amtrak

Seafle

WA

CDBG

Railroad
Crossing
Signal
Improvements
‐
Improve
key
railroad
crossings
in
the
Seafle
Waterfront
Quiet
Zone
to
 improve
safety
along
rail
corridor
that
serves
Amtrak,
Sound
Transit
and
freight
trains. King
Street
Sta3on
Renova3on
–
renova3on
of

historic
train
sta3on
that
serves
Sound
Transit
commuter
trains
 and
Amtrak
intercity
rail
into
a
modern,
mul3‐modal
transporta3on
hub Goodwill
Development
Associa3on,
Teen
Home
Fire
Sprinkler
System

Seafle

WA

CDBG

Neighborcare
Health
SE
Seafle
Dental
Clinic,












2,000,000


Seafle

WA

CDBG

Seafle

WA

CDBG

Seafle
Chinatown
Interna3onal
District
Preserva3on
and
Development
Authority,
Nutri3on
Program
Space
 Rehabilita3on United
Indians
of
All
Tribes
Founda3on,
Teen
Parent
Home
Major
Rehabilita3on












1,750,000


Seafle

WA

CDBG

Repair
sewer
line
from
sidewalk
to
main
lateral
line
in
street
at
the
Central
Area
Senior
Center.
















80,000


0.5

Seafle

WA

CDBG

Replace
the
an3quated
heat
pumps
with
new,
more
efficient
heat
pumps
in
the
Greenwood
Senior
Center.














100,000


0.75

Seafle

WA

CDBG

Upgrade
the
electrical
panels,
branch
circuits,
and
grounding
system
in
the
Greenwood
Senior
Center.














160,000


1.25

Seafle

WA

CDBG

Replace
original
aluminum
single‐pane
with
new
double‐pane
windows
at
the
Central
Area
Senior
Center.














300,000


2.25

Seafle

WA

CDBG














400,000


3

Seafle

WA

CDBG

Re‐zone
the
Hea3ng,
Ven3la3ng,
and
Air
Condi3oning
system
at
the
Southeast
Heath
Community
Center
to
 provide
even
distribu3on
of
HVAC. Replace
aging
roof
at
Southeast
Health
Clinic.














850,000


6.8

Seafle

WA

Energy

Retrofit
lights
at
various
Seafle
parks














225,000


2

Seafle

WA

Energy

Solar
Hot
Water
at
major
ins3tu3ons














161,000


2.5

Seafle

WA

Energy

Seafle
Parks
condensing
boiler
installa3on














400,000


3

Seafle

WA

Energy

Upgrade
ligh3ng
in
various
departments














630,000


4.25

Seafle

WA

Energy

Energy
efficiency
and
small
scale
renewable
projects
at
Cedar
Falls
Hydro
opera3ons.












1,000,000


5

Seafle

WA

Energy

Solar
Power
on
Seafle
City
Hall














600,000


7

Seafle

WA

Energy

Community
Solar
project‐

100kw
solar
photovoltaic
system
located
in
central/eastern
Washington.












1,200,000


8

Seafle

WA

Energy












1,200,000


8

Seafle

WA

Energy

Magnuson
Park
Renewable
Energy
Demonstra3on‐

Install
up
to
25kw
of
renewable
energy
on
three
comfort
 sta3ons
and
rest
rooms. Re‐balance/re‐engineer
the
Variable
Air
Volume
(VAV)
system
in
Airport
Way
Center
Building
Buildings.












1,140,000


8.25

Seafle

WA

Energy

Woodland
Park
Zoo
HVAC
&
Ligh3ng
EE
Upgrades












1,250,000


9

Seafle

WA

Energy

Install
photovoltaic
arrays
on
the
roof
of
Seafle
Department
of
Transporta3on's
Sign
Shop.












1,715,525


13.75

Seafle

WA

Energy

Ligh3ng
retrofit
project
for
Seafle
Municipal
Tower.












3,500,000


15

Seafle

WA

Energy












2,100,000


16.75

Seafle

WA

Energy

Replace
the
an3quated
Hea3ng,
Ven3la3ng,
and
Air
Condi3oning
system
and
expand
Siemens
Controls
at
the
 Charles
Street
Vehicle
Maintenance
Building. Energy
efficiency
and
small
scale
renewable
projects
at
Skagit
Hydro
Opera3ons.












3,000,000


22

Seafle

WA

Energy

Various
small
scale
energy
efficiency
projects
at
city
owned
facili3es












3,420,000


25.75

Seafle

WA

Energy

Central
Plant
EE
Upgrades
at
Major
Ins3tu3ons










12,300,000


89

Seafle

WA

Energy

Various

HVAC
EE
Upgrades
at
publicly‐owned
buildings










17,500,000


130

Seafle

WA

Housing












4,000,000


Seafle

WA

Housing

Bell
Tower
Rehabilita3on‐Major
system
rehabilita3on
including
water
lines,
ven3la3on
system,
windows,
 exterior
coa3ng,
UFAS
upgrades High
Point
HOPE
VI‐Construc3on
of
parks

Seafle

WA

Housing

Ranier
Vista
HOPE
VI‐Construc3on
of
51
LIPH
units












1,500,000


Seafle

WA

Public
Safety

Provision
of
Hand‐held
3cke3ng
devices
to
Traffic
Enforcement
Police
Officers.














412,540


Seafle

WA

Public
Safety

Hiring
of
Eleven
new
Police
Officers
in
2009.














863,709


11

Seafle

WA

Streets/Roads














600,000


30

Seafle

WA

Streets/Roads












1,000,000


270

Seafle

WA

Streets/Roads












4,000,000


280

Seafle

WA

Streets/Roads










16,000,000


560

Seafle

WA

Streets/Roads










50,000,000


2240

Seafle

WA

Streets/Roads










25,000,000


2240

Seafle

WA

Water

Greenwood
Ave
N
‐
Widens
the
roadway
from
four‐lanes
to
five‐lanes
with
parallel
parking,
curb,
gufer,
and
 sidewalks
on
both
sides
from
N
105th
to
N
112th.

Improves
transit
speed
and
reliability
and
increases
safety
 for
all
modes. NE
Northgate
Way
–
Intersec3on
improvements
that
reduce
travel
3mes,
improve
freight
movement
and
 increase
access
to
major
commercial,
health
care
and
higher
educa3on
employers
in
the
area. Aurora
Avenue
N

from
137th
to
145th
St
–
widens
Aurora
Avenue,
a
key
commercial
corridor,
to
support
 economic
growth,
improve
safety
and
mobility,
and

enhance
pedestrian
facili3es.
Includes
transit
lane. E
Marginal
Way
Grade
Separa3on
‐
provides
a
roadway/rail
grade
separa3on
allowing
freight
traffic
and
other
 vehicles
to
pass
over
rail
lines
which
befer
connects
port
terminals,
rail
yards,
warehousing
and
 manufacturers. Mercer
Corridor
East
‐
Widens
Mercer
Street
between
I‐5
and
Dexter
Ave
North
to
accommodate
three
lanes
 of
travel
in
each
direc3on,
parking,
sidewalks
and
a
median
with
leb‐turn
lanes.
Provides
a
more
direct
route,
 improves
access
to
jobs
in
the
surroun Spokane
Street
Viaduct
–
Widens
the
viaduct
and
builds
a
two‐lane
loop
off‐ramp
to
improve
freight
mobility
 and
provide
a
grade‐separated
route
connec3ng
I‐5,
SR
99,
SR
519
and
I‐90
with
container
terminals.
Extends
 exis3ng
bus‐only
lane. Replace
galvanized
domes3c
water
pipe
at
Fire
Sta3on
#18.
















40,000


0.25

Seafle

WA

Water

Repair
the
sewer
main
under
the
Ballard/Northwest
Senior
Center.
















60,000


0.5

Seafle

WA

Water

Repair
the
main
side
sewer
at
Fire
Sta3on
#40














200,000


1.5

Seafle

WA

Water

Re‐pipe
hot
and
cold
domes3c
water
lines
at
the
Charles
Street
Engineering
Building.














200,000


1.5

Facili3es
and
Parks
Maintenance
&
Opera3ons
Center
‐
This
project
would:
Replace
old
and
temporary
facili3es
 which
support
the
City’s
Parks
and
Facili3es
Maintenance
staff
and
opera3ons;
Improve
staff
working
 condi3ons
and
opera3onal
efficiencies; SW
27th
Street/Strander
Boulevard
Connec3on
Project
‐
City
of
Renton City
of
Tukwila
‐
The
SR‐167
HOV/SW
27th
Street/Strander
Boulevard
Connec3on
project
will
provide
an
 alternate
route
to
Interstate
405
between
I‐5
and
SR‐167.

This
project
will
incre Rainier
Avenue
(SR
167)
Improvements
Project
–
Shafuck
Avenue
Stormwater
Bypass
‐
City
of
Renton,
Sound
 Transit,
BNSF
‐
The
Rainier
Avenue
Improvements
project
includes
adding
Business
Access
and
Transit
(BAT)
 lanes,
reconstruc3ng
three
railroad
bridges Earlington
Water
and
Sewer
Replacement
Project
‐
Replacement
of
approximately
8,000
feet
of
aging,
leaky
 and
undersized
water
mains
to
provide
adequate
capacity
for
fire
protec3on
and
to
improve
drinking
water
 quality.

Also
includes
some
upgrades
of
sew New
City
Hall/Shop;

1900's
era
building's
are
in
dire
need
of
replacement

Funding
Required

Jobs










12,000,000


420












4,200,000


147












2,000,000


70












3,700,000


129












1,300,000


26












1,500,000


50












4,000,000


230
















85,000















316,000













1,000,000


City

State

Program

Seafle

WA

Water

Replace
galvanized
piping
at
Fire
Sta3on
#34

Project
Descrip3on

Funding
Required 












200,000


Jobs 1.5

Seafle

WA

Water

Seafle

WA

Water

Upgrade
fire
sta3on
drainage
systems
to
divert
fire
apparatus
washwater
from
storm
sewer
system.














200,000


1.6

NE
107th
and
17th
Culvert
Replacement
–
Replace
culvert
within
Thornton
Creek
damaged
by
2007
storms.














700,000


Seafle

WA

Water

Seafle

WA

Water

Seafle

WA

Water

Seafle

WA

Water

Point
Sewer
Pipe
Rehabilita3on
–
Rehabilita3on
of
sewer
pipe
at
localized
loca3ons
within
the
wastewater
 system
based. Georgetown
Flume
Drainage
Improvement
‐
Construc3on
of
new
drainage
conveyance
system
to
replace
 exis3ng Construc3on
of
Generator
Sta3on
and
Buried
Feeder
line
for
emergency
pumping
at
main
water
source
for
 city. Norfolk
Basin
Water
Quality
Project
–
Reduce
pollutant
loading
to
Duwamish
River

12












1,740,000


15












1,380,000


24












6,270,000


26












2,510,000


Seafle

WA

Water

36

Snoqualmie

WA

Streets/Roads










43,000,000


50












1,500,000


Snoqualmie

WA

Streets/Roads

45

Snoqualmie

WA

Streets/Roads

Snoqualmie

WA

Streets/Roads

Snoqualmie

WA

Water

Snoqualmie

WA

Water

Snoqualmie

WA

Water

Snoqualmie

WA

Water

Snoqualmie

WA

Water

Winery
Booster
Sta3on
Sta3on
PRV,
Beta
Street
water
main
improvements,
Railroad
Place
water
main
 improvements,
Newton
Street
water
main
improvements Sewer
Lib
sta3ons
no.
3
and
4
‐
To
elevate
each
to
avoid
flooding
during
high
water.

Spokane

WA

Streets/Roads

Spokane

WA

Spokane

Madison
Valley
Long
Term
Solu3on
–
Construc3on
of
stormwater
deten3on
system
to
eliminate
surface
 flooding
and
sewer
system
backups. Meadowbrook
bridges
‐
Replace
two
old
small
wooden
bridges
on
one
of
the
enterances
to
town. Railroad
Crossing
Improvements
at
Stone
Quarry
Road,
Meadowbrook
Way
SE,
Norhtern
Street
(two
tracks),
 King
street
(two
tracks) Re‐construct
Meadowbrook
Avenue
‐
Completely
reconstruct
from
sub‐grade
to
surface. Tokul
Road
Roundabout.

To
make
a
very
dangerous
intersec3on
on
State
Route
202
safer
and
more
fuel
 efficent. 599
Reservoir
Madifica3ons
‐
Reservoir
needs
to
be
upgraded
since
it
is
a
cri3cal
part
of
the
exis3g
system Johnson
Heights
Water
System
‐
A
substandard
water
system
aquired
by
the
City
years
ago
that
needs
 considerable
upgrading
to
comply
with
now
day
requirements,
fire
flow
etc. Hospital
Booster
Sta3on
and
PRV
‐
upgrades
along
with
a
PRV
are
needed
to
adequately
serve
the
city














300,000


50












4,000,000


100












5,800,000


110














400,000


20














500,000


25














900,000


30














600,000


30












2,000,000


45

Ben
Burr
Trail
from
Liberty
Park
to
Erie/Riverside
Dr














350,000


15

Streets/Roads

Historic
Iron
Bridge;
rehab
old
RR
bridge
for
ped
and
bike
access














580,000


15

WA

Streets/Roads

5‐Mile
Prairie
from
Ash
to
Lincoln‐Bike
and
pedestrian
improvments;












1,000,000


20

Spokane

WA

Streets/Roads

5th
Ave
from
Washington
to
Monroe












1,100,000


20

Spokane

WA

Streets/Roads

Bike
routes
downtown‐Jefferson,
4th
Ave,
Howard,
Spokane
Falls
Blvd,
Riverside,
Main














719,000


20

Spokane

WA

Streets/Roads

Fish
Lake
Trail;
construct
approx
4.4
miles
of
trail












1,000,000


20

Spokane

WA

Streets/Roads

Buckeye
from
Post
St
to
Division
St;
full
reconstruc3on












1,200,000


30

Spokane

WA

Streets/Roads

Garland
from
NW
Blvd
to
Driscoll;
full
reconstruc3on












1,200,000


30

Spokane

WA

Streets/Roads

Rowan
from
Maple
St
to
Wall
St;
full
reconstruc3on












1,000,000


30

Spokane

WA

Streets/Roads

Wellesley
fro
Assembly
to
Driscoll;
full
reconstruc3on












1,300,000


30

Spokane

WA

Streets/Roads

Mission
from
Hamilton
to
Napa
(includes
signal
replacement
at
Hamilton);
full
reconstruc3on












1,800,000


40

Spokane

WA

Streets/Roads

Barnes
Rd
from
Phoebe
to
Strong
Road.
new
roadway
construc3on












2,200,000


60

Spokane

WA

Streets/Roads

Crestline
from
37th
to
53rd;
full
reconstruc3on
of
the
roadway
including
new
curb
and
sidewalk












2,500,000


60

Spokane

WA

Streets/Roads

Perry
St
from
SE
Blvd
to
Arthur
and
Arthur
from
Perry
to
3rd;
full
reconstruc3on












2,700,000


60

Spokane

WA

Streets/Roads

Freya
St
Bridge;
Rehabilia3on
project










12,000,000


100

Spokane

WA

Streets/Roads

Havana
St
Bridge;
new
grade
separa3on










18,500,000


100

Spokane

WA

Streets/Roads

Lincoln/Monroe
from
the
River
to
17th
Ave;
full
reconstruc3on












5,200,000


100

Spokane

WA

Streets/Roads

Maple/Walnut‐Cedar‐High
Drive
from
5th
to
29th;
full
reconstruc3on












5,500,000


100

Spokane

WA

Water

Barnes
Rd
Water
Main












1,026,000


20

Spokane

WA

Water

Fairchild
AFB
Transmission
Main
Phase
2












5,876,000


75

Sumner

WA

Streets/Roads












6,580,000


45

Tacoma

WA

CDBG

Stewart
Road Located
in
the
ci3es
of
Sumner
and
Pacific
is
a
two‐lane,
22‐foot‐wide
arterial
roadway
connec3ng
West
Valley
 Highway
East
and
State
Route
167
(SR167)
to
East
Valley
Highway
East
and
the
newly
completed
Lake
Tapps
 Parkway
East.
The
roadway 4
Tacoma
Police
Substa3ons
mechanical
system
rehabilita3on.














120,000


2

Tacoma

WA

CDBG

Tacoma
Police
Fleet
Warehouse
Improvements.














310,000


5

Tacoma

WA

CDBG

Tacoma
Police
Special
Teams
Warehouse
Improvements.














460,000


7

Tacoma

WA

CDBG

Tacoma
Police
Department
Sub
Sta3on
Sector
4
Rehabilita3on.














575,000


9

Tacoma

WA

CDBG

Tacoma

WA

CDBG

The
proposed
project
would
upgrade
the
elevators
in
the
Tacoma
Municipal
Building
including
both
sobware
 and
hardware
components. New
computer
aided
dispatch
system
for
LESA.

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Murray
Morgan
Bridge
 The
Murray
Morgan
Bridge
is
currently
closed
to
vehicular
traffic
due
to
its
severe
state
of
disrepair.
While
the
 bridge
is
currently
open
to
pedestrian
traffic,
the
Washington
State
Department
of
Transporta3on
has
 determined
that Structural
Sidewalks The
City
of
Tacoma
currently
has
a
number
of
structural
sidewalks
that
are
unsafe
as
determined
by
the
City’s
 structural
engineer.
These
structural
sidewalk’s
poten3al
for
collapse
pose
a
hazard
to
pedestrians
as
well
as
 the
occupan The
proposed
project
would
reroof
the
Municipal
Complex
which
includes
Tacoma
Municipal
Building,
Tacoma
 Municipal
Building
North,
and
the
Municipal
Garage.
The
roofing
system
has
exceeded
its
usefull
life
and
is
 need
of
replacement Construct
new
Real
Time
Crime
Center
for
LESA.

Tacoma

WA

CDBG

Construct
new
3‐1‐1
Customer
Assistance
Call
Center
for
LESA

The
proposed
project
would
refurbish
the
exterior
of
the
Tacoma
Municpal
Building
which
is
listed
on
the
 Na3onal
Historic
Register
and
was
built
in
the
1920's. Tacoma
Police
Range
and
structure
improvements.














650,000


10












4,000,000


15












1,500,000


25












1,960,000


31












3,000,000


48












3,000,000


48












3,625,000


50












5,325,000


85












9,700,000


154

City

State

Program

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

CDBG

Tacoma

WA

Energy

Tacoma

WA

Energy

Tacoma

WA

Energy

Tacoma

WA

Energy

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tacoma

WA

Water

Tonasket

WA

CDBG

Surface
Water
Collec3on
System
Rehabilita3on
Associated
with
Street
Paving
Projects.

This
project
generally
 consist
of
open‐cut
replacement
or
extension
of
approximately
8,
400
linear
feet
of
surface
water
mains
in
 conjunc3on
with
street
paving
projec CTP
Dissolved
Air
Flota3on
Thickeners
Upgrade.


This
project
will
upgrade
and
add
addi3onal
supply
lines
and
 controls
to
the
Dissolved
Air
Flota3on
Thickeners
(DAFT's)
tanks
used
in
the
Central
Treatment
Plant
secondary
 treatment
process
to
remove
liq CTP
Energy
Management.

This
project
will
implement
the
recommenda3ons
from
Central
Treatment
Plant
 Energy
Management
Study
prepared
by
MWH
for
the
CTP
Upgrade
Project Downtown
Improvement
Project

Vancouver

WA

Streets/Roads

136TH
and
MILL
PLAIN
INTERCHANGE


Vancouver

Vancouver

WA

WA

Project
Descrip3on Americans
with
Disabili3es
Act
Curb
Ramp
Program In
2007
a
survey
of
sidewalks
and
intersec3ons
was
completed
by
the
City
of
Tacoma.
The
survey
found
that
 17,754
curb
ramps
needed
to
be
constructed
to
fully
comply
with
the
Americans
with
Disabili3es
A Tacoma
Dome
facili3es
upgrades
and
renova3ons.

Examples
include
sea3ng
replacement,
security
system,
and
 Exhibi3on
Hall
upgrades. Arterial
Street
Program The
arterial
street
program
currently
has
12
projects
that
are
par3ally
funded
through
grants
and
other
means.
 These
projects
cannot
be
put
out
to
bid
un3l
they
are
fully
funded.
A
total
of
$13.2
million
in
grants
were
 allocated Tacoma
Police
Headquarters‐ 3
Story
Parking
garage
entering
off
Fife
street
(120
new
stalls). Headquarters
Public
Building
addi3on
with
sky
bridge
to
exis3ng
HQ.

Funding
Required










15,000,000


239










17,750,000


283










18,100,000


289










19,500,000


311

Puyallup
River
Bridge This
dilapidated
structure,
is
an
important
east‐west
connec3on
between
the
Port
of
Tacoma
and
the
City
of
 








25,000,000
 Tacoma
as
well
as
the
City
of
Fife,
has
serious
structural
issues
and
may
soon
have
load
limits
imposed
on
it. Law
Enforcement
Support
Agency
(LESA)
is
a
mul3
jurisdic3onal
agency.

New
LESA
9‐1‐1
Communica3ons
 






117,000,000
 Center. The
proposed
project
would
install
new
HVAC
systems
in
both
the
Beacon
and
Lighthouse
Senior
Centers
 replacing
the
exis3ng
steam
boiler
heat
and
replacing
them
with
more
efficient
heat
pumps
in
order
to
provide
 












700,000
 both
heat
and
cooling. The
proposed
project
would
remove
and
replace
the
exis3ng
ligh3ng
system
in
the
Tacoma
Municpal
Complex
 










1,000,000
 in
order
to
make
the
complex
operate
more
efficiently. The
proposed
project
would
upgrade
the
exis3ng
HVAC
system
in
the
Tacoma
Municpal
Building
which
has
 exceeded
its
useful
life
expectancy.
The
project
would
provide
a
much
higher
efficiency
along
with
befer
 










1,850,000
 climate
control
and
tenant
comfort. Digester
Gas
Energy
Recovery.



 This
project
willcollect
digester
gas
from
thhe
wastewater
treatment
plant
and
use
to
produce
heat
and
energy.
 This
will
provide
an
alterna3ve
energy
source
fo
rthe
plant
saving
money
while
reducing
greenhouse
gases. 










7,000,000
 Jefferson
Street
Surface
Water
Main
Replacement. This
project
generally
consist
of
open‐cut
replacement
of
approximately
3,
000
linear
feet
of
exis3ng
surface
 water
mains
that
were
constructed
in
the
early
1900's
and
are
structurally
deteriorated. Jefferson
Street
Wastewater
Main
and
Replacement. This
project
generally
consist
of
open‐cut
replacement
of
approximately
3,
000
linear
feet
of
exis3ng
 wastewater
mains
that
were
constructed
in
the
early
1900's
and
are
structurally
deteriorated. PS4103
Force
Main
Replacement.

Replacement
of
the
Pump
Sta3on
4103
Force
Main
under
the
Hylebos
 Waterway
by
direc3onal
Drilling.

This
project
will
also
provide
upgrades
at
Pump
Sta3ons
4102
and
4103,
 including
provisions
for
third
pumps
at
each
sta3 Wastewater
Collec3on
System
Rehabilita3on. Rehabilitate
(CIPP
lining)
and
spot
repairs
of
approximately
50,000
linear
feet
of
aging
wastewater
collec3on
 system
pipes. Wastewater
Collec3on
System
Rehabilita3on
Associated
with
Street
Paving
Projects.

Jobs

398 1866

15 20

25

49












1,000,000


16












1,000,000


16












1,900,000


30












2,000,000


32












3,000,000


48












5,400,000


86












5,500,000


88












7,000,000


112












6,371,250


50












4,000,000


70

Streets/Roads

This
intersec3on
upgrade
project
has
been
designed
to
alleviate
conges3on
along
the
City’
primary
east/west
 corridor
serving
east
Vancouver.

This
corridor
is
at
capacity,
due
primarily
to
the
failure
of
the
intersec MAIN
STREET
PROJECT










10,800,000


166

Streets/Roads

In
its
full
scope,
the
Main
Street
retail
revitaliza3on
is
much
more
than
a
transporta3on
project.

Along
with
 rebuilding
the
city’s
historic
thoroughfare,
the
project
is
being
designed
in
the
context
of
a
retail
strategy
that
 3e RIVERWEST
PARKING
STRUCTURE










15,000,000


274










38,500,000


614












2,700,000


12

The
Riverwest
development
is
an
urban,
mixed
use
public
private
partnership
to
redevelop
approximately
3.75
 acre
site
in
Downtown
Vancouver.

The
redevelopment
program
includes

Vancouver

WA

Streets/Roads

•
Over
500,000
square
feet
of
mixed‐use
deve DOWNTOWN
VANCOUVER
WATERFRONT
ACCESS
PROJECT The
waterfront
access
project
is
an
es3mated
$38.5
million
capital
project
that
includes
street,
rail
and
u3lity
 work
which
will
provide
access
to
the
downtown
waterfront
redevelopment
area.

Vancouver

WA

Water

The
access
 ELLSWORTH
to
WATER
STATION
#9,
PHASE
II The
majority
of
City
water
supplies
are
in
the
southwest
por3on
of
the
water
service
area
and
major
new
 residen3al
and
industrial
developments
occur
in
the
northeast
por3on
of
the
water
service
area.

The
2007

City

State

Program

Vancouver

WA

Water

Project
Descrip3on

Funding
Required

Jobs

SEWER
CAPITAL
IMPROVEMENT
PROJECTS NE
11th
Street

$


140,000 Riverview
Heights
$1,013,000 Fellman’s
1
&
2
$1,586,000

Vancouver

WA

Water

The
above
projects
are
part
of
a
program
that
provides
public
sanitary
sewer
to
areas
of
the
city
that
were
 developed
without
pu NEIGHBORHOOD
SANITARY
SEWER
PROGRAM












2,739,000


50










10,000,000


95














100,000


4














250,000


5














300,000


6














350,000


7














400,000


8












3,000,000


60

Eliminate
failing
sep3c
systems Protect
human
health Protect
Sole
Source
Drinking
Water
Aquifer Protects
home
values

Wenatchee


WA

Schools

The
number
of

jobs
created
by
the
Neighborhood
Sanitary
Sewer
Program
Project
would
be
appr Wenatchee
High
School
Irriga3on
Main
Replacement,
Replace
failing
irriga3on
main

Wenatchee


WA

Schools

Wenatchee
High
School
Life
Safety
Alarm
System
Upgrade,
upgrade
obsolete
fire
alarm
system

Wenatchee


WA

Schools

Wenatchee


WA

Schools

Wenatchee


WA

Schools

Wenatchee
High
School
Tennis
Court
Replacement,
Replace
exis3ng
Tennis
Courts.

Current
courts
are
cracked
 and
poses
trip
hazards,
etc.

Facility
is
u3lized
by
all
schools
in
the
district
as
well
as
the
general
public Wenatchee
High
School
Ligh3ng
upgrade,

Replace
obsolete
(1972)
ligh3ng
system
with
new
energy
efficient
 ligh3ng
system Apple
Bowl
Stadium
Grandstand
Replacement,

Replace
deteriorated
stadium
grandstands

Wenatchee


WA

Schools

Wilbur

WA

Water

Pioneer
Middle
School
Moderniza3on,
Improve
inadequate
locker
rooms
and
provided
ADA
access.

Replace
 Gymnasium
ligh3ng
system Wilbur
Wastewater
Treatment
Plant:
replacement
of
old
lagoons
with
Plant












5,600,000


112

Winthrop

WA

CDBG

Town
shop














300,000


12

Winthrop

WA

Streets/Roads

Resurfacing
Projects














178,000


7

Winthrop

WA

Streets/Roads

Downtown
Street
Light
Improvements

Winthrop

WA

Streets/Roads

Castle
Gap
Improvement
Design

Yakima

WA

Airport

Yakima
Air
Terminal
Fire
Sta3on
Remodel

Yakima

WA

Airport

East
Runway
Safety
Area
‐
16th
Ave
Realignment

Yakima

WA

CDBG

Capitol
Theatre
Pavilion
and
Plaza












4,000,000


Yakima

WA

CDBG

Miller
Park
Ac3vity
Center
Expansion
and
Remodel












2,500,000


50

Yakima

WA

CDBG

Southeast
Community
Center
Rehabilita3on












2,500,000


50

Yakima

WA

CDBG

Yakima
308
Irriga3on
System
Rebuild












5,000,000


50

Yakima

WA

CDBG

Renewal
Communit
Neighborhood
Sewer
Main
Installa3on












5,000,000


120

Yakima

WA

Public
Safety

Integrated
Public
Safety
System












3,000,000


50

Yakima

WA

Streets/Roads

Arterial
Grind
and
Overlay












5,000,000


50

Yakima

WA

Streets/Roads

Fruitvale
Canal
Piping
and
Pathway












2,400,000


50

Yakima

WA

Streets/Roads

West
Nob
Hill
Blvd
Expansion












4,600,000


50

Yakima

WA

Streets/Roads

Yakima
Downtown
Futures
Ini3a3ve












6,400,000


60

Yakima

WA

Streets/Roads

East
Nob
Hill
Bridge
Rehabilita3on












4,000,000


100

Yakima

WA

Streets/Roads

Lincoln
Ave/MLK
Blvd.
Railroad
Grade
Separa3on
Project












8,000,000


320

Yakima

WA

Transit

Yakima
Valley
Trolley
System
Restora3on












5,000,000


50

Yakima

WA

Water

Sewer
Main
Installa3on












5,000,000


50

Yarrow
Point

WA

CDBG

92nd
Avenue
NE
‐
Full
Street
2"
Overlay
(SR
520
to
NE
47th
Street)














550,000


20

Yarrow
Point

WA

CDBG

NE
34th
Street
‐
Full
Street
2"
Overlay
(92nd
Avenue
NE
West)














150,000


20

Yarrow
Point

WA

CDBG

NE
41st
Street
‐
Full
Street
2"
Overlay
(92nd
Avenue
NE
West)














150,000


20

Yarrow
Point

WA

CDBG

Public
Sports
Court














100,000


20

Yarrow
Point

WA

CDBG














200,000


25

Yarrow
Point

WA

CDBG














300,000


25

Yarrow
Point

WA

CDBG












1,300,000


50

Yarrow
Point

WA

Water

Stormwater
Capital
Improvement
Project
#2
‐
94th
Ave.
NE:
Based
on
Jan.
2008
Comprehensive
SW
 Management
Plan
Recommenda3ons;
Upsize
815LF
of
exis3ng
stormwater
infrastructure; Stormwater
Capital
Improvement
Project
#3
‐
NE
47th
Street:

Based
on
Jan.
2008
Comprehensive
SW
 Management
Plan
Recommenda3ons;
Upsize
~600LF
of
exis3ng
SW
infrastructure Stormwater
Capital
Improvement
Project
#1
‐
NE
42nd
Street/92nd
Avenue
NE:
Based
on
Jan.
2008
 Comprehensive
SW
Management
Plan
Recommenda3ons;
Upsize
3,900LF
of
exis3ng
stormwater
 infrastructure;
overflows
poten3ally
threaten
an
exis3ng
sanitary
sewer Local
Fountain
Improvements
‐
Bid
Package
ready














150,000


15

Beloit

WI

Energy

Alterna3ve
Fuel
Vehicles














100,000


Beloit

WI

Energy

2010:
Energy
Conserva3on














100,000


Beloit

WI

Energy

Energy
Conserva3on,
library
green
roof
and
City
Hall
Solar














100,000


2

Beloit

WI

Housing

Public
Housing
Upgrades














398,000


22

Beloit

WI

Public
Safety

2010:
Shotspofer
‐
gunshot
loca3on
and
detec3on
system














200,000


0

Beloit

WI

Public
Safety

City
Hall
Security
System
/
Audio‐Video
















75,000


0

Beloit

WI

Public
Safety

Mobile
Data
Radio
Modem
‐
GPS
Upgrade
















87,500


0

Beloit

WI

Public
Safety

Shotspofer
‐
gunshot
loca3on
and
detec3on
system
















40,000


0

Beloit

WI

Public
Safety














100,000


1

Beloit

WI

Public
Safety

2010:
Traffic
Preemp3on,
Install
a
traffic
preemp3on
system
in
all
fire
department
emergency
response
 vehicles. Two
Drug
and
Gang
Unit
Officers,
Salary
and
Benefits














174,880


2

Beloit

WI

Public
Safety

Wireless
Network
Expansion














158,825


5

Beloit

WI

Streets/Roads

2009:
Rail
Crossing
Improvements
on
Henry
Ave.
and
Milwaukee
Road














125,000


5

Beloit

WI

Streets/Roads

2010:

Townhall
Road
Culvert
Replacement














181,000


9














200,000


8














955,000


20














600,000


50












3,000,000


60

2

City

State

Program

Beloit

WI

Streets/Roads

2009:
Cranston
Road
to
Milwaukee
Road
Intersec3on
Improvements

Project
Descrip3on

Funding
Required 












250,000


Jobs 10

Beloit

WI

Streets/Roads

Beloit

WI

Streets/Roads

2010:
Fourth
Street
Parking
Lot
Reconstruc3on














200,000


10

2010:
Cranston
Road
Pavement
Repairs:

Prairie
Ave
‐West
City
Limits














300,000


Beloit

WI

13

Streets/Roads

2009:
Concrete
Street
Repairs














350,000


Beloit

15

WI

Streets/Roads














395,000


20

Beloit

WI

Streets/Roads

2010:

Public
Ave.;

Pleasant
‐
College.
Public
Ave.
New
curb
and
gufer,
pavement,
lead
service
replacement,
 water
main
and
sanitary
sewer
repair
as
needed,
and
decora3ve
street
ligh3ng
are
included
for
this
project. 2009:
Park
Avenue
Street
Ligh3ng














507,000


25

Beloit

WI

Streets/Roads

2009:
Harvey
Street
Reconstruc3on
from
Wisconsin
to
Yates














595,000


30

Beloit

WI

Streets/Roads

2009:
Sager
Lane
Railspur














635,750


30

Beloit

WI

Streets/Roads

2010:
Morse
Avenue
Reconstruc3on














677,000


35

Beloit

WI

Streets/Roads














705,000


37

Beloit

WI

Streets/Roads














750,000


38

Beloit

WI

Streets/Roads

2010:
East
Side
Neighborhood
Ini3a3ve
Streets
‐
Central
from
Chapin
to
Emmerson
and
Chapin
from
Central
to
 the
dead
end,
Construct
2010. 2010:
West
Side
Neighborhood
Ini3a3ve
Street,
This
project
will
reconstruct
Merrill
St
from
Vine
to
Fourth
and
 Sixth
St
from
Portland
Ave
to
Merrill. 2009:
Millington
Road
Reconstruc3on














800,000


45

Beloit

WI

Streets/Roads

2010:
Annual
Street
Maintenance














625,000


45

Beloit

WI

Streets/Roads

2009:
Annual
Street
Maintenance














800,000


50

Beloit

WI

Streets/Roads

2009:
Re‐Allignment
of
Mill
Street












1,000,000


50

Beloit

WI

Streets/Roads

2009:
ABC
Parkway
Extension

Beloit

WI

Streets/Roads

Beloit

WI

Beloit

WI

Beloit














987,000


55

2009:
Extend
Gateway
Boulevard
from
Eagles
Ridge
Drive
to
Hart
Road












3,875,572


200

Transit

2009:
Purchase
of
two
hybrid
transit
buses












1,000,000


0

Transit

2010:
Replace
3
1997
Phantom
buses.














263,538


0

WI

Transit

















2,000


0

Beloit

WI

Transit

2010:
Shop
Equipment:
Purchase
of
regularly
required
and
periodic
major
bus
maintenance
parts
and
 replacement
of
maintenance
equipment. 2010:
Transit
System
regular
replacement
cycle
of
exis3ng
copier,
fax
machine,
and
computer
equipment.

Beloit

WI

Transit

Beloit

WI

Beloit

WI

Beloit

















1,620


0

2009:
Transit
Transfer
Site
Building














543,543


30

Water

2009:
Replace
Influent
Screeing
Press














112,000


0

Water

2009:
Wastewater
Pollu3on
Control
Facility
Security
System














100,000


0

WI

Water

2009:
WPCF
Standby
Power














580,000


0

Beloit

WI

Water

2010:
Replace
Influent
Screenings
Press














112,000


0

Beloit

WI

Water

2009:
Replace
TC
Hydrants














115,000


1

Beloit

WI

Water

2010:
Replace
TC
Hydrants














118,000


1

Beloit

WI

Water

2009:
Aera3on
Basin
Tank
Upgrade
















30,000


2

Beloit

WI

Water

2009:
Aera3on
Blower
Upgrades
















45,000


2

Beloit

WI

Water

2009:
Clarifier
Upgrades
















45,000


2

Beloit

WI

Water

2009:
Storm
Sewer
Improvements
















50,000


2

Beloit

WI

Water

2009:
Well
Pumping
Equipment
















82,000


2

Beloit

WI

Water

2010:

Clarifier
Upgrades
















45,000


2

Beloit

WI

Water

2010:

Well
Pumping
Equipment.
















84,000


2

Beloit

WI

Water

2010:
Aera3on
Basin
Tank
Upgrade
















30,000


2

Beloit

WI

Water

2010:
Storm
Sewer
Improvements
















50,000


2

Beloit

WI

Water

2009:
Interceptor
Access
Roads
















50,000


3

Beloit

WI

Water

2010:
Interceptor
Access
Roads
















50,000


3

Beloit

WI

Water

2010:
Well
#4
Rebuild
















95,000


3

Beloit

WI

Water

2009:
Recoat
Mill
Water
Tower














350,000


4

Beloit

WI

Water

2009:
Stormwater
Seflement
Ponds












1,428,000


5

Beloit

WI

Water

2009:
Water
Main
Replacement
Program














700,000


5

Beloit

WI

Water

2010:
Water
Main
Replacement
Program














721,000


5

Beloit

WI

Water

2009:
Northwest
Interceptor
Grou3ng














525,000


6

Beloit

WI

Water

2009:
Mi3gate
Well
#11
Nitrate












1,980,000


10

Beloit

WI

Water

2009:
Sanitary
Sewer
Repair














355,000


10

Beloit

WI

Water

2010:
Sanitary
Sewer
Repair














365,000


10

Beloit

WI

Water

2009:
Biosolids
Dewatering
&
Odor
Control












5,700,000


15

Beloit

WI

Water

2009:
Gateway
Blvd.
Sewer
and
Water
Extension












3,430,000


85

Cedarburg

WI

CDBG










10,000,000


50

Cedarburg

WI

CDBG












5,000,000


50

Cedarburg

WI

Streets/Roads

Library
building
project
on
contaminated
site,
remedia3on
plan
currently
being
reviewed
by
the
EPA
for
clean
 up
to
begin
spring
2009
followed
by
construc3on
of
new
27,000
sq
b
library
building Remedia3on
and
development
of
business
site
where
owner
is
bankrupt
and
funding
is
not
available.

 Neighboring
proper3es
also
contaminated
due
to
business. Interurban
Trail
asphalt
overlay,
south
end
of
trail
(Center
St.
to
south
of
Pioneer
Rd.)

















25,000


3

Cedarburg

WI

Streets/Roads

Doerr
Way














110,000


5

Cedarburg

WI

Streets/Roads

Grant
Avenue














145,000


5

Cedarburg

WI

Streets/Roads

Street
Improvement
projects:

Riveredge
Drive














220,000


15

Cedarburg

WI

Streets/Roads

Cedar
Creek
Walkway












1,500,000


20

Cedarburg

WI

Water

St.
John
Ave.
from
Cleveland
St.
to
Center
St.

















30,000


5

Cedarburg

WI

Water














120,000


5

Green
Bay

WI

CDBG

Storm
water
improvement
projects: Doerr
Way
storm
sewer Downtown
Mall
Site
Demoli3on
and
Infrastructure
Development












2,800,000


20

Green
Bay

WI

CDBG

Children's
Museum
of
Green
Bay












3,500,000


25

Green
Bay

WI

CDBG

Neighborhood
Block
Redevelopment/Enhancement












5,000,000


30

City

State

Program

Green
Bay

WI

CDBG

Construc3on
of
Federal
Courthouse

Project
Descrip3on

Funding
Required

Jobs

Green
Bay

WI

CDBG

CityDeck
Phase
II
Urban
Parkway
Construc3on

Green
Bay

WI

CDBG

Build
out
Agrilink
Site

Green
Bay

WI

CDBG

Webster
Avenue
Reconstruc3on
from
Radisson
to
East
River

Green
Bay

WI

CDBG

Brown
County
Central
Library
Restora3on

Green
Bay

WI

CDBG

Expand
KI
Center
Conven3on
Space

Green
Bay

WI

CDBG

Parking
Ramp
Construc3on

Green
Bay

WI

Energy

EECBG
Coordinator
















75,000


3

Green
Bay

WI

Energy

EECBG
Green
building
incen3ves














225,000


28

Green
Bay

WI

Energy

City
Hall
Energy
Efficiency
Upgrades














311,000


35

Green
Bay

WI

Housing

Safety
Repairs
at
Mason
Manor
public
housing
for
seniors














100,000


5

Green
Bay

WI

Public
Safety

Forensic/Disaster
Recovery
Truck














240,000


Green
Bay

WI

Public
Safety

Police
Department
Public
Safety
Ini3a3ves

Green
Bay

WI

Public
Safety

Regional
Training
Facility
















90,000


Green
Bay

WI

Public
Safety

Police
Evidence
Drying
Room
















40,000


5

Green
Bay

WI

Public
Safety

Community
Service
Interns
Program
expansion














180,000


12

Green
Bay

WI

Streets/Roads

Pavement
Resurfacing
and
Repairs














650,000


12

Green
Bay

WI

Streets/Roads

Lombardi
Avenue
Enhancement












1,000,000


20

Green
Bay

WI

Streets/Roads

Mason
Street:
Erie
to
Grandview












1,600,000


30

Green
Bay

WI

Streets/Roads

Recrea3onal
Trail
Connec3on












3,800,000


50

Green
Bay

WI

Streets/Roads

Military
Avenue
Reconstruc3on
from
Langlade
to
Dousman










13,000,000


100

Green
Bay

WI

Transit

Purchase
8
new
buses














200,000


6

Green
Bay

WI

Water

The
Woods
Stormwater
Deten3on
Pond














400,000


20

Green
Bay

WI

Water

Baird
Creek
Sanitary
Sewer
Interceptor












1,400,000


50

Green
Bay

WI

Water

Green
Bay
Developed
Areas
Stormwater
Management
Retrofits:
Phase
II












2,700,000


100

Janesville

WI

CDBG

Residen3al
Housing
Rehabilita3on
Program
Expansion














100,000


1

Janesville

WI

CDBG

Service
Ac3vi3es
Targetd
to
Low
and
Moderate
Income
Individuals
















50,000


1

Janesville

WI

CDBG

Target
Area
Slum
and
Blight
Elimina3on
Program














100,000


1

Janesville

WI

CDBG

Lead
Hazard
Control
Program














300,000


3

Janesville

WI

CDBG

Downtown
Parking
Structure












3,000,000


30

Janesville

WI

CDBG

Neighborhood
Stabiliza3on
Program












3,000,000


30

Janesville

WI

Energy

Residen3al
Housing
Rehabilita3on
Program
Energy
Efficiency
Grants














100,000


1

Janesville

WI

Energy

Municipal
Building
Server
Room
Reloca3on














250,000


3

Janesville

WI

Energy

Landfill
Phase
Closure
Including
Gas
Capture
System














700,000


7

Janesville

WI

Energy

Ice
Arena
Renova3on
and
Energy
Efficiency
Upgrades












1,000,000


10

Janesville

WI

Energy

Landfill
Phase
Construc3on
Including
Leachate
Pumping
System
Upgrades












1,170,000


12

Janesville

WI

Energy

Landfill
Scale
and
Scalehouse
Replacement/Renova3on














150,000


15

Janesville

WI

Streets/Roads

Sandhill
Dr.
Infrastructure
Extension














130,000


1

Janesville

WI

Streets/Roads

Willow
Glade
Development














139,000


1

Janesville

WI

Streets/Roads

Fulton
Ave.
Infrastructure
Extension














269,600


3

Janesville

WI

Streets/Roads

Venture
Dr.
and
Progress
Dr.
Infrastructure
Extension














296,500


3

Janesville

WI

Streets/Roads

Curb
and
Gufer
Replacement
and
Reconstruc3on














420,000


4

Janesville

WI

Streets/Roads

Southside
Bike
Trail
Construc3on














425,000


4

Janesville

WI

Streets/Roads

Springbrook
Bike
Trail
Extension














360,000


4

Janesville

WI

Streets/Roads

New
and
Replacement
Sidewalk
Construc3on














510,000


5

Janesville

WI

Streets/Roads

Northeast
Side
Bike
Trail
Extension














450,000


5

Janesville

WI

Streets/Roads

E.
Milwaukee
St.
Bike
Trail
Tunnel














590,000


6

Janesville

WI

Streets/Roads

Street
Maintenance,
Resurfacing,
&
Repair
Program














650,000


7

Janesville

WI

Streets/Roads

Ruger
Ave.
(Springbrook)
Bridge
Replacement














802,000


8

Janesville

WI

Streets/Roads

Westside
Bike
Trail
Extension












1,000,000


10

Janesville

WI

Streets/Roads

Aus3n
Rd.
Improvements












1,050,000


11

Janesville

WI

Streets/Roads

Wright
Rd.
Infrastructure
Improvements
and
Sewer
&
Water
Extension












1,130,000


11

Janesville

WI

Streets/Roads

McCormick
Dr.
Infrastructure
Extension












1,436,000


14

Janesville

WI

Streets/Roads

Ruger
Ave.
Improvements












2,200,000


22

Janesville

WI

Streets/Roads

Milwuakee
St.
Bridge
Replacement












5,500,000


55

Janesville

WI

Streets/Roads

Jackson
St.
Bridge
Replacement












6,356,000


64

Janesville

WI

Transit

Transit
Maintenance
Building
Construc3on












6,250,000


63

Janesville

WI

Water

Undersized
Water
Main
Replacement














300,000


3

Janesville

WI

Water

Water
Main
Replacement
Program














350,000


4

Janesville

WI

Water

Lead
Water
Services
Replacement














540,000


5












2,500,000


50












3,500,000


60












9,000,000


100












5,800,000


120










10,000,000


150










10,000,000


150










10,000,000


150










10,000,000
 1

City

State

Program

Janesville

WI

Water

Black
Bridge
Rd.
Water
Main
Reloca3on

Project
Descrip3on

Funding
Required 










1,300,000


Jobs 13

Janesville

WI

Water

Wastewater
Treatment
Plant
Expansion










32,000,000


320

Madison

WI

CDBG

Complete
Phase
II
of
Briqngham
Park
project;
restrooms,
office,
user
ac3vi3es














400,000


2

Madison

WI

CDBG

Elver
Park
‐‐
Open
shelter
w/
electrical
and
water
at
sports
fields
for
picnics;
build
on‐site
Maintenance
bldg.
 for
athle3c
fields,
etc.














150,000


2

Madison

WI

CDBG

Restrooms
at
Lake
Edge
Park
and
Burrows
Park














500,000


2

Madison

WI

CDBG














500,000


3

Madison

WI

CDBG

Summit
Maintenance
Facility
‐‐Phase
II
/
Freeport
Rd.
bldg.
expand
to
accommodate
West
Forestry
and
expand
 West
Maintenance Olin
‐
Turville
Park
‐‐
Build
shelter
/
overlook
at
John
Nolen
Dr














600,000


4

Madison

WI

CDBG

Property
Assessment
Program
for
property
assessment
and
taxa3on
func3ons














900,000


5

Madison

WI

CDBG

Various
area
parks
‐‐
Open
air
shelter
w/
electrical
and
water
at
17
Area
Parks
built
since
1985

Madison

WI

CDBG

Elizabeth
Link
Peace
Park
‐‐
Re‐build
en3re
site
as
per
plan

Madison

WI

CDBG

Vilas
Park‐‐
Re‐build
exis3ng
shelter;
re‐build
path
&
roads;
beach
to
Orchard
St

Madison

WI

CDBG

Madison

WI

CDBG

Forest
Hill
Cemetery
‐‐
Replace
manual
irriga3on
system;
incorporate
water
conserva3on;
repave
exis3ng
 roadway
system;
mill
and
re‐surface Tenney
Park
‐‐
Re‐build
Roadway
and
Parking;
Complete
Shelter
re‐construc3on
Project;
Replace
exis3ng
 pedestrian
bridge
to
Shelter

Madison

WI

CDBG

Madison

WI

Madison














800,000


5












1,000,000


7












1,200,000


8












1,300,000


9












2,000,000


13












2,800,000


19

CDBG

Door
Creek
Park
‐‐
Grading
&
seeding;
build
shelter;
complete
roadway,
parking
and
Bike
Path
Paving;
complete
 Lighted
Tennis
Complex Warner
Park
‐
refurbish
stadium;
re‐build
exis3ng
parking
lot
/
roadways
and
ligh3ng












2,800,000


19

WI

CDBG

Breese
Stevens
Field‐‐
Complete
Phase
II;
concession,
restrooms,
shop,
etc;
replace
grass
w/
"Field
turf"












3,000,000


20

Madison

WI

CDBG












3,000,000


20

Madison

WI

CDBG

Reindahl
Park
‐‐
4
lighted
sobball
w/
concesssion,
complete
Phase
II
of
parking
lots
and
roadways;
irrigate
 sports
fields;
support
maintenance
bldgs Yahara
Parkway
boathouse












3,000,000


21

Madison

WI

CDBG

Build
a
Central
Park
on
Madison's
ithsmus










15,000,000


84

Madison

WI

CDBG

Garver
Feed
Mill
Arts
Incubator










15,400,000


87

Madison

WI

CDBG

Public
pools
at
Warner
Park
and
Reindahl











14,000,000


98

Madison

WI

CDBG

Madison
Public
Market










18,000,000


101

Madison

WI

CDBG

Downtown
Public
Library










40,000,000


225

Madison

WI

Energy

Small
Business
Window
and
Door
Energy
Efficiency
Program














500,000


3

Madison

WI

Energy

Update
HVAC
systems
at
City
of
Madison
facili3es














280,000


5

Madison

WI

Energy












1,000,000


6

Madison

WI

Energy

Expand
exis3ng
MadiSun
program
to
provide
grants
to
businesses
to
install
solar
electric
and
solar
hot
water
 systems Solar
PV
at
City
of
Madison
facili3es
to
generate
electricity












1,100,000


6

Madison

WI

Energy

Placing
concrete
bunkers
for
Yard
Waste
Site
at
Streets
‐
East
















75,000


10

Madison

WI

Energy

Remodel
Streets
maintenance
facility
at
Sycamore














596,800


25

Madison

WI

Energy

Madison

WI

Energy

BioAg
Gateway
Commercializa3on
and
Business
Incuba3on
Facility
‐‐
This
30,000
SF
green‐powered
facility
will
 provide
state
of
the
art
bio‐secure
controlled
environments
for
plant
manufacturing,
business
incuba3on
 space,
prototyping,
and
micro
processin Energy
efficiency
revolving
loan
program
for
City
of
Madison
homeowners

Madison

WI

Public
Safety

Madison

WI

Public
Safety

Madison

WI

Madison










10,000,000


95












1,000,000


300

Police
Department
facility/building
improvements














493,000


3

Police
Department
records
management
system














470,000


3

Public
Safety

Emergency
Warning
Siren
System
‐‐
replacement
of
post‐World
War
II
system














625,000


4

WI

Public
Safety

County
Wide,
Inter‐Operable
Radio
Communica3on
System
‐‐
endorsed
by
FCC










38,000,000


214

Madison

WI

Streets/Roads

Construct
mezzanine
storage
at
Streets
East
maintenance
shop
















83,000


5

Madison

WI

Streets/Roads

Construct
Tradewinds
Parkway
easterly
to
intersect
with
Agricultural
Drive














950,000


5

Madison

WI

Streets/Roads

South
Street
Extension
to
Park
Street
‐‐
provide
the
Dean
Clinic
with
access
to
Park
Street
and
Enhance
Medical
 Access














991,000


6

Madison

WI

Streets/Roads

Parking
Lot
Resurfacing
at
Badger
Rd
Streets
maintenance
shop














368,000


10

Madison

WI

Streets/Roads

Reconstruct
Femrite
Drive
from
Marsh
Road
to
one
mile
east
of
Interstate
39/90.












2,370,000


13

Madison

WI

Streets/Roads

Reconstruc3on
of
Lien
Road
Intersec3on
to
Thompson
Drive
and
Zieir
Road












2,840,000


16

Madison

WI

Streets/Roads

Badger
Vehicle
Storage
Annex
‐‐
tear
down
and
rebuild
exis3ng
vehicle
storage
annex












1,200,000


20

Madison

WI

Streets/Roads

University
Ave
pavement
replacement
‐‐
Farley
to
Segoe
Rd
(replace
pavement
on
arterial
street)












4,600,000


26

Madison

WI

Streets/Roads

Pavement
maintenance
to
avoid
further
deteriora3on
and
costly
reconstruc3on












8,000,000


45

Madison

WI

Transit

Purchase
5
addi3onal
electronic
signs
to
provide
real‐3me
route
and
schedule
informa3on
for
customers
at
 power
equipped
shelters
on
State
Street,
the
Square
and
other
loca3ons.
















65,000


0

City

State

Program

Madison

WI

Transit

Madison

WI

Transit

Madison

WI

Transit

Madison

WI

Transit

Madison

WI

Transit

Madison

WI

Transit

Madison

WI

Madison

Project
Descrip3on Replace
4
high‐floor
paratransit
coaches
with
libs
budgeted
for
2009
with
4
low‐floor
coaches
with
ramps
‐‐
 Benefits
will
include
improved
accessibility
for
people
with
disabili3es. Upgrade
security
cameras
and
communica3on
technology
between
transfer
points,
the
police
department
and
 Metro Cannonball
Bike
Trail,
Phase
1
‐‐
to
connect
Greenway
View
to
the
Capital
City
Bike
Trail

Funding
Required

Jobs














248,000


1














150,000


1












1,050,000


6

Aberg
Avenue
Pedestrian
Bridge
‐‐
installa3on
of
this
bridge
completes
the
Starkweather
Bike
Trail
and
 connects
MATC
and
the
Truax
Airpark
with
the
Capital
City
Trail Train
Sta3ons
to
serve
highspeed
rail












1,380,000


8












2,000,000


11












2,280,000


13

Water

Replace
12
diesel
buses
budgeted
for
2010
with
12
hybrids
‐‐
benefits
include
improved
fuel
economy
and
 fewer
emissions Installa3on
of
Proprietary
Stormwater
Treatment
Catchbasins
in
the
Capital
Neighborhood














800,000


5

WI

Water

Nakoma
Water
Main
Reloca3ons
‐‐
pipeline
improvement
and
service
upgrade














450,000


5

Madison

WI

Water

Pipeline
crossing
Hwy
30
to
improve
pressures
and
overall
water
service














450,000


5

Madison

WI

Water

Pressure
Zone
5
piping
upgrade














300,000


5

Madison

WI

Water

Unit
Well
25
Pumping
Sta3on
Upgrade














200,000


5

Madison

WI

Water

Replace
Wingra
Dam













1,100,000


6

Madison

WI

Water

Arbor
Hills
Pumping
Sta3on
Construc3on
to
increase
water
supply
for
fire
figh3ng
and
service
reliability












1,000,000


8

Madison

WI

Water












1,500,000


8

Madison

WI

Water

Supervisory
Control
and
Data
Acquisi3on
(SCADA)
‐‐
improve
overall
system
opera3on,
energy
conserva3on,
 water
conserva3on,
and
security Booster
Pumping
Sta3on
115
Upgrade














400,000


9

Madison

WI

Water

Cannonball
Trail
Water
Transmission
Main












2,500,000


14

Madison

WI

Water

Water
U3lity
opera3ons
center
upgrade
to
improve
employee
safety,
working
condi3ons,
and
produc3vity.












3,500,000


20

Madison

WI

Water

Install
iron
and
manganese
filters
to
improve
water
quality
and
customer
sa3sfac3on












3,750,000


21

Madison

WI

Water












4,300,000


25

Madison

WI

Water












2,925,000


44

Madison

WI

Water










11,000,000


62

Milwaukee

WI

CDBG

Milwaukee

WI

CDBG

Milwaukee

WI

Energy

Cherokee
Marsh
‐‐
Urban
stormwater
diversion
to
protect
marsh,
stormwater
management
pond,
replace
 restrooms,
pave
exis3ng
roadway/parking Pipeline
replacement
projects
‐‐
Marston
Ave,
Few/Spaight,
Fox/Keyes,
S.
Mills
Street,
N.
Few
St.,
Lawrence
St,
 Maple/Ludington,
 Edgewood
Ave,
Marquefe
St,
 Pickford/Knickerbocker Automa3c
water
meter
reading
‐‐
Convert
system
to
a
fixed
network
automa3c
meter
reading
system
to
 improve
customer
service,
water
conserva3on,
asset
management,
and
data
collec3on Customized
and
green
collar
job
training
in
the
30th
Street
Industrial
Corridor
‐‐
Provide
funds
to
corridor
 employers
to
provide
skills‐specific
training
to
corridor
residents
for
"tradi3onal"
corridor
jobs.

Develop
job
 training
program
for
residents
i Job
Training
‐
Dept.
of
Public
Works
Environmental
Services
in
partnership
with
the
Milwaukee
Area
Workforce
 Investment
Board,
Inc.
and
BIG
STEP/Wisconsin
Regional
Training
Partnership
have
developed
the
Urban
 Forestry
Training
Pilot
Program
‐
Connec3ng
 Buildings
‐‐
Central
Library:

Media/Technology
Center.

Milwaukee

WI

Energy

Buildings
‐‐
Create
three
Express
Center
libraries.












1,000,000


Milwaukee

WI

Energy

Buildings
‐‐
Create
three
Regional
Libraries
($10
M
each).










30,000,000


Milwaukee

WI

Energy

Buildings
‐‐
Forestry
and
Sanita3on
Lincoln
Avenue
facility.












2,500,000


Milwaukee

WI

Energy

Buildings
‐‐
HVAC
upgrades
at
two
neighborhood
libraries.












1,000,000


Milwaukee

WI

Energy

Buildings
‐‐
Install
green
roof
on
Central
Library.












1,000,000


Milwaukee

WI

Energy

Buildings
‐‐
New
East
Library
(joint
use)












2,500,000


Milwaukee

WI

Energy

Buildings
‐‐
New
Villard
Library
(joint
use)












2,500,000


Milwaukee

WI

Energy

Buildings
‐‐
Zablocki
Library:

replace
HVAC,
carpet,
3le
installa3on.

Milwaukee

WI

Energy

Milwaukee

WI

Energy

Milwaukee

WI

Energy

Milwaukee

WI

Energy

Milwaukee

WI

Energy

Milwaukee

WI

Housing

Milwaukee

WI

Housing

Milwaukee

WI

Housing

Milwaukee

WI

Housing

Milwaukee

WI

Housing

City
Building
Energy
Efficiency
‐‐
Retrofit
exis3ng
ligh3ng,
HVAC,
windows,
building
systems,
etc.
that
reduce
 energy
consump3on. Opera3ng
Systems
‐‐
RFID
&
Self‐Check
technology
(par3ally
funded
in
2009
budget,
total
project
cost
$3.5
 million). Street
Ligh3ng
Energy
Efficiency
‐‐
Retrofit
10%
of
exis3ng
city
street
ligh3ng
with
emerging,
energy
reducing
 LED
technology. Urban
agriculture
project
‐‐
Acquire
3‐story,
20,000‐SF
building
and
combine
with
adjacent
City‐owned
2‐acre
 parcel
to
create
a
grower‐to‐market
economic
opportunity. Milwaukee
Energy
Efficiency
(Me2)
‐‐
Retrofit
much
of
the
city's
building
stock
by
allowing
property
owners
 and
renters
to
implement
energy
efficiency
measures
with
immediate
savings
and
no
upfront
costs.

It
saves
 customers
money,
helps
reduce
greenhouse Conserve
natural
resources
‐‐
Replace
15%
of
our
fleet
with
energy‐efficient
vehicles,
which
will
also
reduce
 ongoing
opera3ng
costs.

Install
passive
solar
systems
and
green
roofs
on
high‐rises
for
the
elderly
and
 disabled. Develop
quality,
affordable
rental
housing
‐‐
Revitaliza3on
of
over
800
units
of
affordable
housing
for
seniors,
 families,
and
disabled,
including
the
acquisi3on
and
rehabilita3on
of
foreclosed
proper3es. Lead
Abatement
‐‐
Provide
funding
to
abate
lead
in
1,000
housing
units
including
related
administra3ve
and
 laboratory
costs. Redevelopment
of
former
T.C.
Esser
Paint
factory
site
‐‐
Remediate
and
redevelop
abandoned,
contaminated
 factory
complex
into
housing. Riverwalks
‐‐
Finish
court
ordered
ADA
improvement
on
riverwalks.

Milwaukee

WI

Housing

Security
and
Energy
‐‐ Provide
contrac3ng
opportuni3es
to
address
deferred
maintenance
needs,
which
would
include
pain3ng,
 landscaping,
moderniza3on
of
elevators
for
seniors
and
disabled,
enhanced
security
systems,
etc.














750,000













2,000,000


80












2,600,000















750,000
 










5,000,000
 










1,500,000
 








14,000,000
 












772,000











20,000,000













5,400,000
 








56,000,000
 










5,000,000
 










2,595,000
 










2,000,000













7,050,000


300

City

State

Program

Milwaukee

WI

Housing

Milwaukee

WI

Public
Safety

Milwaukee

WI

Public
Safety

Milwaukee

WI

Milwaukee

Project
Descrip3on

Funding
Required

Employment
and
Training
‐‐ Provide
cri3cal
employment
and
training
opportuni3es
for
a
minimum
of
70
youth,
young
adults
and
 dislocated
workers. 3rd
District
Police
‐‐
Renova3on
of
old
3rd
District
Sta3on
into
neighborhood
task
force
facility.












1,550,000













2,090,000


Public
Safety

Buildings
‐‐
Central
Library:

Masonry
repair,
pain3ng,
mechanical
upgrades,
solar
panels,
interior
finishes,
drive‐ up
window
upgrade,
Centennial
Hall
upgrades. Buildings
‐‐
Central
Library:

Restora3on
of
Mosaic
and
Scagiola
in
Rotunda.

WI

Public
Safety

Buildings
‐‐
City
Hall
‐‐
8th
Floor
City
Aforney
Offices












5,700,000


Milwaukee

WI

Public
Safety

Buildings
‐‐
Lower
Parking
floor
replacement
in
Zeidler
Municipal
Building.












1,300,000


Milwaukee

WI

Public
Safety

Buildings
‐‐
Replace
hollow
walk
and
founda3on
stabiliza3on/repair
of
City
Hall.










11,700,000


Milwaukee

WI

Public
Safety

Buildings
‐‐
Zeidler
Municipal
Building
elevator
moderniza3on
project.












1,200,000


Milwaukee

WI

Public
Safety

Engine
House
Replacement
‐‐
Replace
Fire
Engine
House
#8
and
#17.












8,400,000


Milwaukee

WI

Public
Safety

Police
Administra3on
Building
‐‐
Upgrade
building
systems
and
asbestos
abatement.












5,000,000


Milwaukee

WI

Public
Safety

Police
Cars
‐‐
Replace
100
police
cars.












3,500,000


Milwaukee

WI

Public
Safety

Repair
Shop
‐‐
Replace
exis3ng
inadequate
Fire
equipment
repair
facility
with
new
facility.










15,000,000


Milwaukee

WI

Public
Safety

Milwaukee

WI

Schools

Milwaukee

WI

Streets/Roads

Milwaukee

WI

Streets/Roads

Various
Police
Facili3es
‐‐
Improvements
and
building
system
upgrades
to
6
police
district
sta3ons
and
 evidence
storage
facility. UWM‐Engineering
School
‐‐
Purchase
downtown
land
and
prepare
land
for
the
new
loca3on
of
the
UWM‐ Engineering
School. 440th
Air
Force
Reserve
Base
redevelopment
‐‐
To
accommodate
redevelopment
of
the
property
previously
 occupied
by
the
440th
Air
Force
Reserve
Base,
closed
February
2,
2008
under
the
Base
Realignment
and
 Closure
Act
of
2005,
provide
funds
to
separate
prope Alleys
‐‐
Complete
100+
deferred
alley
construc3on
and
maintenance
projects.

Milwaukee

WI

Streets/Roads

Bridges
‐‐
Maintenance
on
six
ver3cal
lib
bridges.










13,090,000


Milwaukee

WI

Streets/Roads

Buildings
‐‐
Salt
Dome
at
Ruby
Garage.












1,200,000


Milwaukee

WI

Streets/Roads

Facility
grounds
‐‐
Slope
stabiliza3on,
regrading,
sidewalks,
railings,
ligh3ng,
road
repair/replacement.












3,000,000


Milwaukee

WI

Streets/Roads

Milwaukee

WI

Streets/Roads

Residen3al
redevelopment
at
31st/Galena
‐‐
Remediate
parcels
and
design
and
install
infrastructure
for
 residen3al
development. Street
Construc3on
‐‐
Complete
2003‐2008
deferred
street
project
list.










10,000,000


Milwaukee

WI

Streets/Roads

Milwaukee

WI

Milwaukee

Jobs

70












1,000,000













5,000,000













5,000,000
 










5,000,000













4,000,000
 








15,000,000















550,000











41,600,000


Streets/Roads

Street
Construc3on
‐‐
Increase
construc3on
to
improve
street
condi3on
based
on
audit
of
the
residen3al
street
 program. Street
Ligh3ng
‐‐
Accelerate
control
circuitry
replacement.

WI

Streets/Roads

Street
Ligh3ng
‐‐
Replace
series
circuitry
to
improve
energy
efficiency.












8,000,000


Milwaukee

WI

Streets/Roads












5,000,000


30

Milwaukee

WI

Streets/Roads

Street
Maintenance
‐‐
Pavement
joint
repair,
asphalt
sealing,
asphalt
overlay,
pavement
crackfilling
and
 sidewalk
improvement. Street
Construc3on
‐‐
Resurface
deteriora3ng
Port
roads.












3,000,000


116

Milwaukee

WI

Streets/Roads










25,645,000


700

Milwaukee

WI

Streets/Roads












3,005,000


1500

Milwaukee

WI

Transit

Milwaukee

WI

Water

Redevelopment
of
former
Tower
Automo3ve
site
‐‐
Create
business
park
at
the
site
of
the
former
Tower
 Automo3ve
auto
parts
plant.

Project
includes
demoli3on,
environmental
inves3ga3on
and
remedia3on,
and
 design
and
installa3on
of
infrastructure
(st Brewery
Project
‐‐
Build
new
street
system
to
support
the
redevelopment
of
the
former
Pabst
Brewery
as
 housing,
office
and
retail
uses.

Streets
are
designed
to
incorporate
bioswales
and
an
innova3ve
storm
water
 management
system.

First
phase
of
street
 Mass
Transit
‐‐
Develop
and
implement
a
Connector
system/street
car
system
to
improve
access
to
downtown,
 reduce
travel
3me
and
reduce
vehicle
emissions. Buildings
‐‐
New
porous
parking
lots
to
reduce
rain
runoff.

Milwaukee

WI

Water

Filtering
System
‐‐
Replace
media
filters
at
Linnwood
and
Howard
water
treatment
plants.












4,000,000


Milwaukee

WI

Water










10,000,000


Milwaukee

WI

Water

Great
Lakes
Research
Facility
‐‐
Provide
Infrastructure
and
facili3es
support
for
the
recently
created
School
of
 Freshwater
Science,
the
first
and
only
of
its
kind
in
the
U.S. Howard
Plant
‐‐
Howard
water
treatment
plant
west
clear
well
and
pump
room
roof
replacements.

Milwaukee

WI

Water

Linnwood
Plant
‐‐
Linnwood
water
treatment
plant
fluoride
chemical
feeds
system
replacement.














750,000


Milwaukee

WI

Water

Pipeline
‐‐
Reline
the
wash
water
tank
pipeline
at
the
Linnwood
Plant.














500,000


Milwaukee

WI

Water












3,000,000


Milwaukee

WI

Water

Port
Expansion
‐‐
Move
container
yard
to
consolidate
open
space
for
addi3onal
Port
development
and
improve
 Port
opera3onal
efficiency. Port
Facili3es
‐‐
Terminals,
demoli3on
of
old
facili3es,
tuck
poin3ng.

Milwaukee

WI

Water

Storage
Tank
‐‐
Greenfield
elevated
water
storage
tank
pain3ng
project.












2,500,000


Milwaukee

WI

Water

Storage
Tank
‐‐
Menomonee
water
storage
tanks
demoli3on
and
decommissioning.












4,500,000


Milwaukee

WI

Water

Various
O&M
Projects
‐‐
Various
maintenance
projects
at
all
Water
facili3es.












1,875,000


Milwaukee

WI

Water

Water
Mains
‐‐
Twenty‐eight
water
main
replacement
projects,
ranging
from
$45,000
to
$3.3
million.












6,600,000


Milwaukee

WI

Water

Water
Meter
Shop
‐‐
Replace
acid
cleaning
area,
valves,
piping,
test
benches.

Milwaukee

WI

Water

Sewer
‐‐
Complete
sanitary
sewer
rehab,
including
laterals,
for
three
systems
as
s3pulated
by
DOJ.










23,000,000


27

Milwaukee

WI

Water

Sewer
‐‐
Complete
76
sewer
projects
that
reduce
sewer
overflow.










31,430,000


37

Milwaukee

WI

Water

Various
Infrastructure
‐‐
Terminal
resurfacing,
dock
walls,
ship
aprons,
dredging,
phytoremedia3on
area.














685,000


45

Milwaukee

WI

Water










15,000,000


150

Milwaukee

WI

Water

Water
Business
Park
‐‐
Develop
a
200‐acre
business
park
and
incubator
space
that
serves
the
growing
 freshwater
research
and
business
sectors
in
metropolitan
Milwaukee.

Assemble
and
remediate
land,
design
 and
install
infrastructure.

This
project
supports Breakwater
‐‐
Rehabilitate
deteriora3ng
Lake
Michigan
breakwater.












5,000,000


193

Milwaukee

WI

Water

Major
Equipment
‐‐
Replace
crawler
crane
to
improve
export
capacity.












4,100,000


278

Milwaukee

WI

Water












7,000,000


500

New
Berlin

WI

CDBG

Business
Expansion/Facility
Reloca3on
‐‐
Relocate
exis3ng
solid
waste
transfer
sta3on
and
self‐help
recycling
 center
at
Green
Tree
and
Industrial
Road
to
accommodate
expansion
of
business. North
Lane
Storm
Sewer
Easement
Extension














100,000


10

New
Berlin

WI

CDBG

Underwood
Creek
Streambank
Stabiliza3on












2,500,000


20

New
Berlin

WI

CDBG

City
Center
Roadway
/
Stormwater
/
Streetscape
Improvements












4,500,000


40

New
Berlin

WI

CDBG

Citywide
Stormwater
Drainage
Improvements














250,000


60

New
Berlin

WI

Energy

City
Hall
Solar
panels












5,000,000









100,000,000
 












325,000













2,700,000















475,000















175,000













1,200,000


City

State

Program

New
Berlin

WI

Energy

Wind
Turbine
w/Manufacturer

Project
Descrip3on

Funding
Required Jobs 








15,000,000
 16

New
Berlin

WI

Public
Safety

Controlled
Dispatch














900,000


4

New
Berlin

WI

Schools

NB
West
HS
&
Middle
School
Sewer
Extension














750,000


30

New
Berlin

WI

Schools

Eisenhower
HS










15,000,000


50

New
Berlin

WI

Streets/Roads

124th
street

New
Berlin

WI

Streets/Roads

Calhoun
Road
Rehabilita3on












8,415,000


New
Berlin

WI

Water

Rogers
Drive
Sewer
Rplcmnt












2,700,530


New
Berlin

WI

Water

Calhoun
water
main
extension

New
Berlin

WI

Water

Lake
Michigan
Water
Remedia3on












4,300,000


8

New
Berlin

WI

Water

Sewer
relining
(city
wide)












1,000,000


20

New
Berlin

WI

Water

Parkland
Green
Water
main
replmt
and
pavement












3,778,000


23

Racine

WI

Energy

Construc3on
of
a
green
roof
on
the
Public
Library














400,000


8

Racine

WI

Public
Safety

Upgrades
to
911
Dispatch
Center














450,000


5

Racine

WI

Transit

Purchase
of
2
buses
for
our
transporta3on
flee














300,000


4

Racine

WI

Water

Airiline
Road
16"
Watermain
Replacement














500,000


6

Racine

WI

Water

State
Street
12"
Main
Replacement














520,000


6

Racine

WI

Water

Michigan
Boulvard
Interceptor
Improvements














700,000


7

Racine

WI

Water

Newman
Road
24"
Water
Main
Replacement














900,000


9

Racine

WI

Water

Ohio
Street
Interceptor
Improvements












1,600,000


16

Sheboygan

WI

CDBG












2,160,000


75

Sheboygan

WI

CDBG

Sheboygan

WI

CDBG

10th
Street
and
Florida
Avenue
Flood
Mi3ga3on
and
Reconstruc3on
including
storm
sewer,
curbing,
and
road
 improvements Indiana
Avenue
Street
Reconstruc3on,
including
reconstruc3on
of
water,
storm,
sanitary
sewer,
roadway,
street
 ligh3ng. Eisner
Avenue
Reconstruc3on,
including
bicycle
lanes/sidewalks,
new
u3li3es,
and
roadway
improvements

Sheboygan

WI

CDBG

Sheboygan

WI

CDBG

Sheboygan

WI

Sheboygan














549,000















231,000


6














675,927


75












3,838,676


100

Central
Business
District
street
and
flood
mi3ga3on
improvements












2,000,000


200

Purchase
addi3onal
land
to
expand
the
Sheboygan
Business
Center
to
allow
for
more
industrial
development.













7,000,000


800

CDBG

Development
of
a
high‐end
technology
park
within
the
City
limits










15,000,000


1000

WI

Energy














300,000


75

Sheboygan

WI

Public
Safety














750,000


8

Sheboygan

WI

Streets/Roads












7,000,000


35

Sheboygan

WI

Transit














250,000


50

Sheboygan

WI

Transit

Replace
old
windows
in
City
Hall
with
new
energy
efficient
windows
and
install
new
energy
efficient
ligh3ng
 fixtures.

Upgrade
HVAC
system
to
meet
the
current
needs
of
the
building. Addi3onal
police
officers
on
the
street
to
deal
with
street
crime
issue
such
as
drugs,
violence,
criminal
damage
 and
make
LMI
neighborhoods
more
safe. Construc3on
of
a
Pedestrian
Bridge
over
the
Sheboygan
River
to
retain
jobs
and
development
addi3onal
jobs
 to
a
pennisula
area Provide
feeder
services
bus
route
to
the
Central
Business
District
from
outlying
areas
to
get
people
to
jobs
in
 the
downtown
area. Add
addi3onal
bus
routes
to
Metropolitan
Areas
to
allow
LMI
persons
to
get
jobs
outside
of
the
City
limits.














350,000


75

Sheboygan

WI

Transit














500,000


100

Sheboygan

WI

Transit

Eliminate
or
reduce
bus
fares
for
one
year
to
increase
ridership
to
encourage
usage
of
the
public
transit
system
 and
allow
people
to
get
to
employment
opportuni3es Purchase
new
energy‐efficient
transit
buses
to
replace
aged
buses
and
provide
befer
gas
mileage.














500,000


100

Sheboygan

WI

Water

Perform
sanitary
sewer
lining
of
various
segments
of
the
City's
sanitary
sewer
system.














300,000


50

Superior

WI

CDBG

28th
Street
Culvert
Lining.

Lining
of
a
48
inch
culvert
carrying
flow
from
a
tributary
of
Faxon
Creek.
















10,000


Superior

WI

CDBG

Superior

WI

CDBG

Superior

WI

CDBG

Superior

WI

CDBG

Superior

WI

CDBG

Superior

WI

CDBG

City
of
Superior
Milling
and
Overlay
Projects.

This
project
consists
of
a
3.25
inch
mill
and
HMA
overlay
on
 various
streets
in
Superior.
 Hill
Avenue
Culvert
Rehabilita3on.

Rehabilita3on
of
an
8
foot
by
8
foot
arch
culvert
under
Hill
Avenue
on
Faxon
 Creek
in
the
city
of
Superior. Moccasin
Mike
Road.

Reconstruc3on
of
1.9
miles
of
roadway
accessing
the
city
of
Superior
landfill
and
 Wisconsin
Point
recrea3on
area. Superior
Animal
Rescue
Building.
A
new
state‐of‐the‐art
eco‐conscious
"green
Animal
Rescue
Founda3on
 building
for
the
City
of
Superior. Wetland
Mi3ga3on
Bank.

Development
of
a
wetland
mi3ga3on
bank
in
support
of
the
city's
SAMP
Banking
 Program. Winter
Street
Industrial
Park.

Development
of
a
6
lot
Industrial
Park
located
in
Superior,
WI

Superior

WI

CDBG

Superior

WI

Energy

Superior

WI

Schools

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Superior

WI

Streets/Roads

Wisconsin
Point
Road.

Reconstruc3on
of
3.4
miles
of
roadway
and
associated
parking
accessing
the
Wisconsin
 Point
recrea3on
area. Superior
Landfill
Gas
to
Energy.
This
project
includes
crea3ng
power
genera3on
at
the
Superior
Landfill
from
 landfill
methane. Great
Lakes
Elementary
School
Access
and
Parking
Modifica3ons.

Reconfigura3on
of
access
points
and
parking
 areas
at
Great
Lakes
Elementary
School.
 28th
St.
Reconstruc3on.

Reconstruc3on
of
.85
miles
of
28th
Street. Arrowhead
Pier.
This
project
will
replace
the
exis3ng
structure
with
a
new
fishing
pier
and
associated
site
 improvements
to
support
the
pier. Bardon
Road
Reconstruc3on.

Reconstruc3on
of
.9
miles
of
Roadway
adjacent
to
the
city
of
Superior
Golf
 Course. Billings
Park
Storm
Sewer
&
Water
Quality
Basin.

This
project
will
ul3mately
reduce
stormwater
and
surface
 water
flows
to
combined
sewers
through
construc3on
of
a
system
of
separate
storm
sewers. City
of
Superior
Salt
Storage
Facility.

This
project
will
greatly
increase
the
city's
salt
storage
capacity.












2,000,000
 














75,000
 










2,300,000
 










2,102,000
 












420,000
 










1,750,000
 










3,500,000
 










2,000,000
 












150,000
 










2,900,000
 












800,000
 












450,000
 










4,700,000
 












750,000


Citywide
Sidewalk
Replacements.

This
project
will
consist
of
replacing
and
reparing
old
and
deteriora3ng
 sidewalks
throughout
the
city
as
determined
by
the
City
of
Superior
Sidewalk
Replacement
Program. Montreal
Pier
Sheet
Piling.
This
project
will
enable
new
mari3me
business
and/or
research.













2,000,000


South
Superior
Stormwater
Interceptor.

Project
will
included
installa3on
of
a
stormwater
interceptor
and
a
 network
of
sewer
mains. Tower
Ave.
Concrete
Rehabilita3on.
Concrete
Rehabilita3on
for
four
miles
of
Tower
Ave.












1,700,000


USH
2
Off
Ramp
to
Susquehanna
Ave.

Development
of
an
off
ramp
from
USH
2
to
the
industrial
park
on
 Susquehanna
Ave.












1,500,000













7,500,000













1,000,000


City

State

Program

Superior

WI

Water

Superior

WI

Water

Superior

WI

Water

Superior

WI

Water

Superior

WI

Water

Superior

WI

Waukesha

Project
Descrip3on Lib
Sta3on
04/Upstream
Piping
Reconstruc3on.

The
project
is
to
remove
the
flow
restric3on
with
installa3on
 of
appropriately
sized
piping.
 Lib
Sta3on
07/Upstream
Piping
Reconstruc3on.

The
project
will
replace
undersized
piping
with
larger
 diameter
piping.
 Newton
Creek/Sanitary
Sewer
Reconstruc3on.

The
project
will
mi3gate
a
known
sanitary
sewer
overflow
 loca3on. Sanitary
Sewer
Treatment
Plant
Ultra
Violet
Disinfec3on
Conversion.



Funding
Required

Jobs
















75,000
 












175,000
 












150,000
 










1,100,000
 










1,600,000


Water

Sanitary
Sewer
Treatment
Plant.

This
project
entails
establishing
a
pH
adjustment
system
for
the
main
 treatment
plant
in
order
to
maintain
ammonia
compliance
with
our
upcoming
permit. Tower
Ave.
Combined
Sewer
Repair
and
Rehabilita3on.

This
rehabilita3on
will
alleviate
flooding
in
the
area.


WI

CDBG

New
Fire
Sta3on
No.
2












3,400,000


165

Waukesha

WI

CDBG

New
Fire
Sta3on
No.
3












3,500,000


168

Waukesha

WI

Streets/Roads

Coolidge
Ave
(Scof
Ave‐
S.
Grand
Ave)‐‐Reconstruc3on














197,000


9

Waukesha

WI

Streets/Roads

W.
Roberta
Ave
(Scof
Ave‐Grand
Ave)‐‐Reconstruc3on














199,000


10

Waukesha

WI

Streets/Roads

Chicago
Ave
(Hyde
Park
Ave‐Randall
St)‐‐Paving














253,000


12

Waukesha

WI

Streets/Roads

Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Reconstruc3on














984,000


47

Waukesha

WI

Streets/Roads

W.
St.
Paul
Ave
(Wisconsin
Ave‐North
Ave)‐‐Reconstruc3on












1,100,000


53

Waukesha

WI

Streets/Roads

N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Reconstruc3on












1,290,000


62

Waukesha

WI

Streets/Roads

Arcadian
Ave
(Eugene
Ct.‐Anitol
Street)‐‐Reconstruc3on
and
paving












1,624,000


78

Waukesha

WI

Water

Coolidge
Ave
(Scof
Ave‐S.
Grand
Ave)‐‐Sanitary
sewer
Reley
















78,000


4

Waukesha

WI

Water

W.
Roberta
Ave
(Scofb
Ave‐S.
Grand
Ave)‐‐Sanitary
sewer
Reley
















79,000


4

Waukesha

WI

Water

Coolidge
Ave
(Scof
Ave‐S.
Grand
Ave)‐‐water
Main
Reley














118,000


6

Waukesha

WI

Water

W.
Roberta
Ave
(Scofb
Ave‐S.
Grand
Ave)‐‐Water
Main
Reley














118,000


6

Waukesha

WI

Water

Chicago
Ave
(Hyde
Park
Ave‐Randall
Street)‐‐Water
Main
Reley














209,000


10

Waukesha

WI

Water

N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Water
Main
Reley














427,000


20

Waukesha

WI

Water

Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Water
Main
Reley














495,000


24

Waukesha

WI

Water

N.
Grand
Ave
(Laflin
Ave‐Harrison
Ave)‐‐Sanitary
sewer
Reley














534,000


26

Waukesha

WI

Water

Arcadian
Ave
(Eugene
Ct‐
Anitol
Street)‐‐Sanitary
sewer
Reley














590,000


28

Waukesha

WI

Water

Summit
Ave
(Bidwell
Ave‐Moreland
Blvd)
Water
Main
relay














735,000


35

Waukesha

WI

Water

Scof
Ave
(Coolidge
Ave‐Newhall
Ave)‐‐Sanitary
sewer
Reley












1,193,000


57

Waukesha

WI

Water

S.
Commanche
Ln
(MacArthur
Rd‐Crestwood
Dr)‐‐Water
supply
improvement












1,242,000


60

Waukesha

WI

Water

Westowne
subdivision‐‐Sanitary
sewer
lining

Athens Big
Piney

WV WY

Energy CDBG

Costruc3on
of
3,000
square
foot,
LEED
cer3fied
town
hall Town
Maintenance
Building












1,287,000
 












700,000


60 20














300,000


10

Big
Piney

WY

Streets/Roads

Big
Piney
Streets
Reconstructoin
(P.L.
Lane
Area)












1,200,000


15

Big
Piney

WY

Streets/Roads

Big
Piney
Streets
Reconstructoin
(South
of
Budd)












1,830,000


26

Big
Piney

WY

Streets/Roads

Big
Piney
Streets
Reconstruc3on
(North
of
Budd)












2,200,000


30

Casper

WY

CDBG

Alley
Paving
in
CDBG
Eligible
Areas














100,000


Casper

WY

CDBG

Casper
Soccer
Complex
‐
Install
Light
on
2
Fields














300,000


Casper

WY

CDBG

Containerized
Trash
Collec3on
in
CDBG
Eligible
Areas
















50,000


Casper

WY

CDBG

Renovate
North
Casper
Historical
Community
Clubhouse
















80,000


4

Casper

WY

CDBG

Town
Square
Public
Space
‐
W.
Yellowstone
Economic
Development
District












1,600,000


20

Casper

WY

CDBG

Field
of
Dreams
Baseball
Complex
‐
3
Field
Complex












2,500,000


25

Casper

WY

CDBG












6,800,000


35

Casper

WY

Energy

Ft.
Casper
Phase
II
Neighborhood
Infrastructure
Reconstruc3on
Project
‐
Roads,
Drainage,
Water,
Sewer,
 Sidewalks Alternate
Energy
Consultant
Services
at
Water
Treatment
Facility
and
Wastewater
Treatment
Facility

Casper

WY

Energy

Casper
Events
Center
Retrofit
Ligh3ng
to
Energy
Savings
Technology














450,000


Casper

WY

Energy

Casper
Events
Center
Window
Replacements














150,000


Casper

WY

Energy

City
Center
Replacement
of
50
Year‐Old
Inefficient
HVAC
with
Energy
Efficient
Models














220,000


Casper

WY

Energy

Energy
Retrofits
to
Municipal
Buildings














500,000


Casper

WY

Energy

Installa3on
of
Energy
Efficient
LED
Lights
in
City
Center
Parking
Lot














180,000


Casper

WY

Energy

Installa3on
of
Solar
School
Crossing
Flashers














264,000


Casper

WY

Energy

Recrea3on
Center/Aqua3cs
Center
Solar
Panels
















95,000


Casper

WY

Energy

Vehicle
Replacement
to
Hybrids,
Alternate
Fuels














150,000


Casper

WY

Energy

Wastewater
Treatment
Plant
‐
Co‐Generator
(Methane,
Electric)














200,000


Casper

WY

Energy

Casper
Service
Center/Garage
Light
Retrofit
to
Energy
Saving
LED














200,000


5

Casper

WY

Energy

Streetlight
Retrofit
to
Energy
Saving
LED














350,000


10

Casper

WY

Energy

Tree
Plan3ng
‐
Increase
Tree
Canopy
to
Reduce
Urban
Heat
Island
Effect














250,000


12

Casper

WY

Energy

Casper
Events
CEnter
Energy
Savings
Improvements
(HVAC,
Boiler,
Air
Handlers,
Pumps)












4,900,000


35

Casper

WY

Public
Safety

Emergency
Generator
at
Casper
Service
Center

Casper Casper

WY WY

Public
Safety Public
Safety

Emergency
Vehicle
Detectors
at
Signalized
Intersec3ons Fire
Sta3on
No.
3
Replacement














350,000
 










1,100,000


Casper

WY

Public
Safety

Fire
Sta3on
Renova3ons














350,000


Casper

WY

Public
Safety

Police/Fire
Mobile
Data
Systems














280,000


Casper

WY

Public
Safety

Public
Safety
Training
Center
Technology
















90,000


Casper

WY

Public
Safety

Radio
System
Expansion
‐
Emergency
Management














130,000


Casper

WY

Streets/Roads

Traffic
Signal
Upgrades
to
12"
Heads/LEDs














220,000


Casper

WY

Streets/Roads

Concrete
Street
In‐Laid
Traffic
Markings














200,000


Casper

WY

Streets/Roads

Municipal
Garage
Elevator
Replacements














400,000


6

Casper

WY

Streets/Roads

Durbin
Street
Reconstruc3on














450,000


10

Casper

WY

Streets/Roads

Fairgrounds
Road/Casper
Street
Drainage
Improvements














450,000


10














450,000















350,000













4,500,000


6

City

State

Program

Casper

WY

Streets/Roads

15th/Missouri
Street
Traffic
Signal

Project
Descrip3on

Funding
Required 












350,000


Jobs 12

Casper

WY

Streets/Roads

Casper

WY

Streets/Roads

15th/Beverly
Street
Intersec3on
Improvements














650,000


15

Annual
Residen3al
Street
Overlay
Program














800,000


Casper

WY

15

Streets/Roads

Municipal
Garage
Security
Improvements














220,000


Casper

15

WY

Streets/Roads

I‐25/Wy.
Boulevard
Beau3fica3on/Landscaping
Improvements














150,000


20

Casper

WY

Streets/Roads

Walkability
(Alterna3ve
Travel)
Improvements














450,000


20

Casper

WY

Streets/Roads

Annual
Arterial/Collector
Rehabilita3on












3,000,000


28

Casper

WY

Streets/Roads

Casper
Mountain
Road
‐
Widen
and
Reconstruc3on














600,000


28

Casper

WY

Streets/Roads

David
Street
Extension












1,200,000


28

Casper

WY

Streets/Roads

Buckboard
Road
Reconstruc3on












1,300,000


30

Casper

WY

Streets/Roads

Paradise
Drive
Roadway,
Water,
Sewer,
Drainage
Reconstruc3on












4,800,000


35

Casper

WY

Streets/Roads

West
Yellowstone
Phase
II
Reconstruc3on/Urban
Renewal
Area












4,500,000


50

Casper

WY

Transit

3
New
Hybrid
Buses

Casper

WY

Transit

Casper

WY

Casper

WY

Casper














450,000


5

Rails
to
Trails/Greenways,
Paths
and
Ameni3es












1,000,000


25

Water

Floa3ng
Covers
‐
Digesters
at
Wastewater
Treatment
Facility












1,200,000


10

Water

Annual
Sewer
Rehabilita3on












1,000,000


12

WY

Water

Oakcrest
Watermain














450,000


12

Casper

WY

Water

Biosolids
Compos3ng/Disposal
Facility












1,000,000


15

Casper

WY

Water

Water
Treatment
Facility
Emergency
Backup
System












3,000,000


15

Casper

WY

Water

Zone
IV
Water
System
Improvements














900,000


15

Casper

WY

Water

10
MG
Reservoir
Renova3on












5,000,000


20

Casper

WY

Water

Downtown
Low
Pressure
Watermain
Improvements












1,600,000


20

Casper

WY

Water

Amoco
Road
Zone
II
B
Watermain
Extension/Booster
Sta3on












2,700,000


25

Dixon

WY

Water

Wastewater
Lib
Sta3on
&
Collec3on
Improvements














600,000


3

Dixon

WY

Water

Water
system
improvements














600,000


3

Elk
Mountain

WY

Water

Water
Supply
Improvements












4,400,000


8

Hanna

WY

Water

Watewater
Treatment
Plant












3,200,000


16

Hanna

WY

Water

Water
Storage
Tank












1,700,000


17

Hanna

WY

Water

Water
Treatment
Plant
Upgrade












2,000,000


20

Hanna


WY

Water

Water
Source
Development












1,000,000


10

LaBarge

WY

Water

Construct
Water
Treatment
Plant












1,500,000


8

Marbleton

WY

CDBG

Community
Buildinjg
/
Recrea3on
Center










30,000,000


250

Marbleton

WY

Energy

Wind
trubine
power
genera3on
to
offset
energy
use
associated
with
wastewater
aerators














500,000


10

Marbleton

WY

Streets/Roads

Alsade
Drive
curb,
gufer,
paving














414,000


8

Marbleton

WY

Streets/Roads

Eiden
Curb,
Gufer,
Paving












2,686,000


33

Marbleton

WY

Streets/Roads

Phase
III
‐
Marbleton
Streets
sidewalks
and
flatwork












2,735,500


35

Marbleton

WY

Water

Main
water
lines
(East
to
West)














497,000


8

Marbleton

WY

Water

Well
#7
‐
Flouride
removal
‐
treatment














640,000


8

Marbleton

WY

Water

Water
tower
replacment














980,000


20

Marbleton

WY

Water












2,000,000


75

Medicine
Bow

WY

Water

Aerated
Wasterwater
Treatment
Laggoons.

Project
could
include
Wind
Turbines
to
offset
aerator
energy
use.
 Project
is
par3ally
locally
funded.

Overall
lagoon
cost
is
$4.6
million
exclusive
of
$500,000
wind
turbines.

 Fire
Flow
Improvements












1,500,000


6

Saratoga

WY

Water

Water
Meters
&
Distribu3on
Improvements












5,900,000


30

Star
Valley
Ranch

WY

CDBG

Vista
Drive
Road
Reconstruc3on
and
U3li3es
‐
Commericial
District
Development












1,600,000


25

Star
Valley
Ranch

WY

Water

Water
Meters
for
Conserva3on
and
Control












1,275,000


15

Star
Valley
Ranch

WY

Water

Water
Supply
Wells
(2)












1,500,000


15

Star
Valley
Ranch

WY

Water

Domes3c
water
supply,
storage,
various
improvements
as
outlined
in
Level
I
Masterplan
‐
PHASE
I
‐
Prater
tank,
 SCADA,
Well
Comple3on
(par3ally
funded)














850,000


30

Star
Valley
Ranch

WY

Water

Star
Valley
Ranch

WY

Water

Domes3c
Water
Supply
Improvments
Phase
II
as
outlined
in
Level
I
Masterplan
‐
Transmissoin
Lines,
GC
Tank,
 etc. Replacement
of
deteriorated
and
undersized
Distribu3on
Piping












3,000,000


40












9,500,000


125

M

THE UNITED STATES CONFERENCE OF MAYORS

Tom Cochran, CEO and Executive Director 1620 Eye Street, NW Washington, DC 20006 Tel: 202.293.7330 Fax: 202.293.2352 Email: [email protected] usmayors.org

Related Documents