BUREAU OF INDIAN STANDARDS INSPECTION REPORT FOR NEW LPG CYLINDERS AS PER IS 3196(PT 1):2006 1.
CM/L- No.
:
Date
:
Last Visit by
:
M/s
:
Person(s)
:
Date
Last Performance : Satisfactory / Not Satisfactory 2.
Manufacturing activities being carried out at the time of visit (indicate by ) * ( ( ( ( ( ( ( ( ( (
3.
) Circle cutting ) Bung Hole Punching ) Heat Treatment ) Zinc Coating ) Acceptance Test ) Training ) Bung Welding ) Pneumatic(1) Test ) Valve Fixing ) Other than Cylinder Manufacturing
( ( ( ( ( ( ( ( (
) Deep Drawing ) Backing Strip Fitting ) Hydrostatic Test ) Painting ) Burst Test ) Degreasing ) Circumferential Welding ) Shot Blasting ) Pneumatic(2) Test
Raw material Control ( since last visit )
a) Cylinder Body Steel ( Qty in no. of halves ) TISCO A) B) C) D) E) F)
SAIL
IMPORTED
Received B/F Received ( Current) Processed Under Process Used for B/S F/R In Stock ( A+B) – (C+D+E) Deshaped
b) Bung
Sc-F & Head(BHBO)
Test Certificate Inhouse Testing Change in Vendor Quantity
( ( ( (
) ) ) )
c) ERW Pipe
Test Certificate Inhouse Testing Change in Vendor ISI marked Quantity
( ) ( ) ( ) Yes/No ( )
d) Welding Consumables
Test Certificate Inhouse Testing Change in Vendor Storing & Moisture Controlling
( ( ( ( (
) ) ) ) )
e) Backing Strip/Foot Ring 4.
Calibration Control :
Pressure gauges
Pyrometer
Thread gauges
5. a) b) c) f)
UTM
Weighing Balance
Torque Wrench
Others
INDEPENDENT TEST SAMPLE d) Materials : IS 6240 Grade I e) Proposed Laboratory
Code Batch Sl No. Test Results of the Batch : Yield Stress
Elongation
Hoop Stress
Expansion in HST
6. a) Acceptance Test Batch No Yield Stress,MPa Elongation, % UTS, MPa Macro examination Burst Pressure, MPa Material Grade IS 6240 Grade I Hoop Stress ,MPa Expansion in HST, % b) Hydrostatic Test c) Pneumatic Test
Ultimate Stress
TEST WITNESSED d) Welding and Construction Visual appearance of weld Workmanship Gap between ground and cylinder bottom e) Paint Thickness Appearance/Shade f)
Valve Fittings Torque Gauging Inside Cleaning Pneumatic Test
BIS TEST AND INSPECTIONS 1. No. of Cylinders certified since last visit : IOCL ________________ Freon 12 _______________ Others ________________ BPCL ________________ Freon ________________ RLHG __________________ HPCL ________________ TOTAL ______________________________________ 2. No. of visits paid by inspecting officers : 3. Deficiency noted by IO yet to be resolved at the time of visit. ____________________________________________________________________________________ POINT FOR IMMEDIATE ACTION
____________________________________________________________________________________ POINT FOR IMPROVEMENT
____________________________________________________________________________________ OVERALL ASSESSMENTS
____________________________________________________________________________________ Use ( ) & ( * ) in appropriate box to indicate compliance and non-compliance if not specified.
Signature
:
Name
:
Designation : Date
-3-
: