List of Revised Metro corridors proposed for implementation is as below :
Sr. No.
Corridor
Length (k.m.)
Phase
1
Versova-Andheri-Ghatkopar
11.40
Phase I
2
Charkop-Bandra-Mankhurd-Dahisar*
32.00
Phase I
3
Colaba-Bandra-SEEPZ
33.50
Phase I
4
Charkop-Dahisar (Merged with Line 2)
7.80
Phase II
5
Wadala-Ghatkopar-Teen Hath Naka (Thane)**
20.70
Phase II
6
Teen Hath Naka- Kasarwadavali (Thane)-Bhiwandi-Kalyan
34.60
Phase III
7
SEEPZ-Kanjurmarg
10.50
Phase III
8
Andheri (E) – Dahisar (E)
18.00
Phase III
9
Sewri-Prabhadevi
3.50
Phase III
Total
172.00