Line #1 Cookie Line

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Line #1 Cookie Line as PDF for free.

More details

  • Words: 77
  • Pages: 1
PRE-OPERATIVE INSPECTION

AREA

COOKIE LINE

ACC/DEF

DESCRIPTION OF THE DEFICIENCY

DESCRIPTION CORRECTIVE ACTION

1. FLOORS 2. MIXER 1 3. MIXER 1A 4. TROUGHS 5. CRANE HOIST 6. APV COOKIE CUTTER 7. SCALES 8. MAIN TABLE BELT 9. SLITTER WHEEL 10. INFEED BELT 11. FREEZER BELT 12. SINKS 13. UNTENSILS 14. CART 15. ROLLING STEPS 16. BARRELS 17. DRAINS 18. OUTFEED BELT PACKING 19. METAL DETECTOR BELT 20.PLASTIC SLIDE AT OUTFEED

QA INSPECTORS SIGNATURE____________________________

DATE_________________

SANITATION SIGNATURE________________________________

DATE_________________

Related Documents

Line #1 Cookie Line
May 2020 15
Line
June 2020 11
Line
April 2020 24
Time Line 1
November 2019 8
On Line 1 Sinergia
June 2020 7