SIKAR BlKANER HIGHWAY LIMITED SBHLlPRJ/TEC/ICO-581
12577
March 06, 2019
The Independent Engineer, MSV International, Inc., Clo Mr. Siddarth Sharma Near Adars Vidhya Mandir, Behind Punch Lungia Haveli, Ratangarh, Churu (Raj)
[email protected] Sub.:
Development and Operation of Sikar-Bikaner Section of NH-11 from Km 340.188 of NH-Il to Krn 557.775 of NH-11 via Sikar Bypass and Bikaner Bypass from Km 553.869 ofNH-ll to Km 267.325 ofNH-89 by Two Laning with paved shoulder in the State of Rajasthan through PPP on DBFOT basis - Revision of User fee as per Clause 27.2.1 of the Concession Agreement.
Dear Sir, This is with reference to Clause 27.2.1 of the Concession Agreement, User fee is to be revised annually on 151 April. in accordance with the provision of Fees rules, 2008. We are herby submitting the revised schedule of user fee for all the four Toll Plazas of Sikar Bikaner Project. The calculation of User fee and link factors are enclosed herewith for your review. The revised user fee shall be effective form 1SI April, 2019 for Financial Year 2019-20. Schedule of LIseI'fee for publication in local news paper is also enclosed herewith for your review and approval. Yours Sincerely, POl'
& on behalf of Sikar Bikaner 1Iighway Limited (SBHL)
A~ignatOry End: As Above Copy 1. 2. 3.
to: The Chief Engineer (NH), PWD Jaipur (for information.) PD cum Superintending Engineer PWD (NH) Circle Bikaner (for information.) PM cum Executive Engineer, PWD (NH), Churu (for information.)
..
•