Letter Head

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Letter Head as PDF for free.

More details

  • Words: 141
  • Pages: 2
D.E.S Construction (916) 806-9080 WORK

REBECCA LOPAR

(530) 743-1877 FAX

7117 STILLWATER COURT

LICENSE # 922681

GRANITE BAY, CA. 95746

[email protected]

D.E.S. Construction will furnish all labor and materials to complete the following project...

South Fence- Remove 36’ of existing fence.

Replace 36’ of fence with 1x4x6’ redwood dog eared slates, 2- 2x4x8’ redwood rails, 5- 4x4x8’ pressure treated posts and 36’ of 2x6 redwood kicker board. All posts will be set at 2’ deep, with concrete.

West Fence-Remove 64’ of fence.

Replace 64’ of fence with 1x4x6’ redwood slates, 2- 2x4x8’ redwood rails, 8- 4x4x10’ pressure treated posts and 8- 1’x8’ lattice privacy panels. All posts will be set at 2’ deep with concrete.

Gate-Remove existing gate. Replace 3’ gate with 1x4x6’ redwood slates, 2x4 redwood supports and new hinges/latch.

South Fence- $792.00 West Fence- $1628.00 7117 Gate $100.00

.

Related Documents

Letter Head
November 2019 17
Letter Head
May 2020 6
Letter Head
May 2020 10
Letter Head
June 2020 7
Polisas Letter Head
May 2020 3
Harvard Letter Head
May 2020 4