Lecture5

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Lecture5 as PDF for free.

More details

  • Words: 1,767
  • Pages: 9
CM CM 420 420

Temporary Structures

Slab Form Design

CM 420 Temporary Structures

Temporary Structures Slab Form Design

CM CM 420 420

Temporary Structures

Slab Formwork

Parts of typical slab formwork

CM CM 420 420

2

Temporary Structures

Slab Formwork ƒ Design Steps: ƒ Step 1: Estimate design loads ƒ Step 2: Sheathing thickness and spacing of its supports (joist spacing) ƒ Step 3: Joist size and spacing of supports (stringer spacing) ƒ Step 4: Stringer size and span (shore spacing) ƒ Step 5: Shore design to support stringers ƒ Step 6: Check bearing stresses ƒ Step 7: Design lateral bracing 3

Professor Kamran M. Nemati Winter Quarter 2007

1

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Example ƒ Design forms to support a flat slab floor 8 in. thick of normal weight concrete, using construction grade Douglas Fir-Larch forming members and steel shoring. Ceiling height is 8 ft. and bays are 15x15 ft. Since forms will have continuing reuse, do not adjust base design values for short term load.

4

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 1: ESTIMATE LOADS: ƒ Dead load, concrete and rebar, [8 in. / (12 in./ft.)]x 150 pcf = 100 psf

ƒ Minimum construction live load on forms 50 psf (refer to lecture #1)

ƒ Weight of forms, estimated 8 psf

Total form design load

100 + 50 + 8 = 158 psf 5

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 2: SHEATHING DESIGN: ƒ Assuming 3/4-in. form grade plywood sheathing, from Tables 4-2 and 4-3:

ƒFb = 1545 psi ƒFS = 57 psi ƒE = 1,500,000 psi ƒS = 0.412 in.3 ƒI = 0.197 in.4 ƒIb/Q = 6.762 in.2

Professor Kamran M. Nemati Winter Quarter 2007

6

2

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 2: SHEATHING DESIGN: ƒ Tables 4-2 and 4-3, for plywood:

7

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK BENDING ƒ For design purposes, consider a 1-foot-wide strip of plywood. Then:

w = design load of 158 psf × 1 ft. = 158 lb/lf l = 10.95

fS w

ƒ Substituting in the equation:

l = 10.95

1545 × 0.412 = 22.0 in. 158 8

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK DEFLECTION ƒ For Δ = l/360: l = 1.693

EI 1500000 × 0.197 = 1.693 = 1.693 1870 = 20.8 in. w 158

ƒ For Δ = 1/16”: l = 3.234

EI 1500000 × 0.197 = 3.234 = 3.234 1870 = 21.2 in. w 158

9

Professor Kamran M. Nemati Winter Quarter 2007

3

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK ROLLING SHEAR ƒ For design purposes, consider a 1-foot-wide strip of plywood. Then: VQ

FS =

Ib

ƒ since Vmax = 0.6wL , so:

FS =

Q VQ = 0.6 wL × or: Ib Ib

FS Ib × 0 .6 w Q

L=

ƒ Substituting in above equation: L=

FS Ib 57 × = × 6.762 = 4.0 ft. or 48 inches 0.6 w Q 0.6 × 158 10

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ From the above calculations, l = 20.8 in. governs. ƒ Meaning that joist supports CANNOT be more than 20.8 inches apart. ƒ HOWEVER, in order to select the span, we must consider the size of the plywood sheets and equal spacing of supports. ƒ In this case, 5 equal spaces of 19.2 inches on an 8-ft. wide plywood sheet will be appropriate. 11

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 3: JOIST SIZE AND SPACING OF STRINGERS TO SUPPORT THE JOISTS: ƒ Check 2x4 construction grade Douglas-Fir-Larch as joist (forms are used repeatedly, so there is no short-term load adjustment). ƒ From Table 4-2: Fb = 1000 psi and FV = 95 psi and should be adjusted for horizontal shear by a factor of 2. E = 1,500,000 psi. F ′ = 2.0 × 95 = 190 psi V

12

Professor Kamran M. Nemati Winter Quarter 2007

4

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example w=

Joist spacing, in. × design load, psf 12 in. ft.

w=

19.2 in. ×158 psf = 253 lb lf 12 in. ft.

ƒ From Table 4-1B, for S4S 2x4s: bd = 5.25 in.2, I = 5.36 in.4, and S = 3.06 in.3

13

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK BENDING l = 10.95

Fb′S 1000 × 3.06 = 10.95 = 38.1 in. w 253

ƒ CHECK DEFLECTION ƒ For Δ = l/360 l = 1.693

EI 1500000 × 5.36 = 1.693 = 1.693 31778 = 1.69 × 31.67 = 53.5 in. w 253

14

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK SHEAR ƒ Using the horizontal shear stress formula for a uniformly loaded continuous beam: fV =

fV = 190 =

0.9 w ⎛ 2d ⎞ ⎜L− ⎟ bd ⎝ 12 ⎠

0.9 × 253 ⎛ 2 × 3.5 ⎞ ×⎜ L − ⎟ 5.25 12 ⎠ ⎝

190 = 43.37 L − 25.3 ⇒ L = 4.69 ft.

ƒ Or L = 4.69’x12 in./ft. = 59.5 inches 15

Professor Kamran M. Nemati Winter Quarter 2007

5

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Comparing the three spans calculated above, l = 38.1 inches governs. ƒ Considering 15x15 feet bays and desire for uniform spacing, 36 inch spacing is a reasonable number. ƒ This means that the spacing of stringers will be at 5 equal spaces per bay.

(5 × 36′′ = 180 inches = 15 feet )

16

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 4: STRINGER SIZE AND SPAN: w=

Stinger spacing, in. 36 in. × load on form, psf = × 158 psf = 474 lb lf 12 in. ft. 12 in. ft.

ƒ Use 4x4 Construction grade Douglas-Fir-Larch stringers. From Table 4-1B for S4S 4x4s: bd = 12.25 in.2, I = 12.50 in.4, S = 7.15 in.3; and d = 3.5 in.

ƒ CHECK BENDING l = 10.95

FV′ S 1000 × 7.15 = 10.95 = 42.5 in. w 474 17

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ CHECK DEFLECTION ƒ For Δ = l/360 l = 1.693

EI 1500000 ×12.50 = 1.693 = 1.693 39557 = 1.69 × 34.07 = 57.6 in. w 474

ƒ CHECK SHEAR ƒ Use the horizontal shear stress formula for a uniformly loaded continuous beam: FV′ =

L=

0. 9 w ⎛ 2d ⎞ F ′bd 2d ⎜L− ⎟ ⇒ L= V + bd ⎝ 12 ⎠ 0.9 w 12

190 × 12.25 2 × 3.5 + = 5.45 + 0.58 = 6.03 ft = 72.4 in. 0.9 × 474 12 18

Professor Kamran M. Nemati Winter Quarter 2007

6

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ From the above calculations, l = 42.5 in. governs. ƒ Meaning that stringers CANNOT be more than 42.5 inches apart (span of stringers). ƒ HOWEVER, in order to select an appropriate span, we must consider the dimensions of the bay. ƒ The 15-ft. bay could be divided into 5 equal spaces of 36 inches (180”/5 = 36”) which is less than the maximum allowable span of 42.5 inches. 19

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Alternatively, we can check the possibility of using a deeper stringer, i.e. 3x6, in order to increase the shore spacing. ƒ Since bending is dominant here, we will check bending for a 3x6 member. ƒ For S4S 3x6s from Table 4-2: Fb = 1000 psf, and from Table 4-1B, S = 12.60 in.3 l = 10.95

Fb′S 1000 ×12.60 = 10.95 = 10.95 × 5.16 = 56.4 in. w 474

ƒ Now we can use 45-in. support spacing for the 3x6 stringers, which will divide the bay into 5 equal spaces. 20

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ STEP 5: SHORE DESIGN: ƒ Stringers are placed 36-inches apart, supported by shores spaced 45 inches apart. The area of support for each shore is:

Area = (36 / 12) × (45 / 12) = 11.25 ft.2 ƒ Then the total load per shore is:

11.25 ft.2 × 158 psf = 1778 lb. 21

Professor Kamran M. Nemati Winter Quarter 2007

7

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Schematic design:

22

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Refer to Table 7-11 for wood shoring material. Both 3x4 and 4x4 are more than adequate to carry 1778 lbs for an effective length of 8 ft.

23

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Step 6: Check Bearing Stresses: ƒ Bearing should be checked where stringers bear on shores and where joists bear on stringers. ƒ Stringers bearing on shore: ƒ Assume the head piece of the adjustable steel shore is 11½x3 5/8". The 3x6 stringer is actually 2½ in. thick.

24

Professor Kamran M. Nemati Winter Quarter 2007

8

CM CM 420 420

Temporary Structures

Slab Form Design CM CM 420 420

Temporary Structures

Slab form Design Example ƒ If the headpiece is placed parallel to the stringer, bearing area is 2½x11½ or 28.75 in.2. Bearing stress will be:

total shore load 1778 = ≅ 62 psi bearing area 28.75 ƒ This is well below the base Fc⊥, which is obtained from Table 4-2 (the value of compression ⊥ to grain, Fc⊥, for No. 2 2×4 Douglas Fir-Larch is 625 psi). 25

CM CM 420 420

Temporary Structures

Slab form Design Example ƒ Joist bearing on Stringers: ƒ The two members are 1½ and 2½ in. wide. ƒ Contact bearing area = 2½x1½ = 3.75 in.2 ƒ Average load transmitted by joist to stringer is: Joist spacing x joist span x form load

19.2 36 × ×158 = 758 lb. 12 12

758 lb = 202 psi 3.75 in.2 Bearing at this point is also low relative to the 625 psi base value for Fc⊥.

Professor Kamran M. Nemati Winter Quarter 2007

26

9

Related Documents

Lecture5
June 2020 4
Lecture5
June 2020 7
Lecture5
June 2020 8
Mark7375-lecture5
May 2020 11
Avr Lecture5
November 2019 34
Lecture5 Bearings
May 2020 8