Larry Zhang Email:
[email protected] Mobile: 0086 13801161199 SUMMARY - Professional with 20+ years of experience in Design and Construction of data centers - Provide complete solution in design, project management, construction and sales. - Authored two books on Data Center design and cooling. - Committee member of Chinese National Standards on Data Center. - Visited and installed Data Center in countries across four continents, including Germany, Saudi Arabia, Sudan, Kenya, and Vietnam. - The first foreigner to visit and install datacenter in North Korea. SELECTED PROJECTS Intel/Tencent QQ Data Center Feb, 2009 – Est. 2011 - Won the contract for new QQ Tianjin Datacenter - 39 acres of building space (160,000 square meter) - Peak capacity of 100,000 servers - First phase to be completed in Dec 2010
Tianjin China
IBM China Research and Development Center Jan 2006 – Sept 2008 Beijing, China Contractor - Designed and modeled UPS and cooling system - Constructed water cool data center with CRAC system - Designed and installed a low-cost Zero-Redundancy UPS system for labs MGE Strategy Plurality MGE Data Center VP Sales Account Management - Turn-key solution Sales
June 2006 – Oct 2008 Beijing, China
IBM China Research and Development Center Sept 2007 – May 2008 Shanghai, China Chief Contractor - Designed and constructed UPS and cooling system in Shanghai; - Installed 19 sets air cooling CRAC, 10 sets chiller water CRAC for main data center, - Installed APC cooling system for IBM blade server lab, at peak density about 30kw/rack. Deutsche bank China HQ Data Center, Jan 2006 – Sept 2008 Chief Contractor - Designed and constructed UPS and cooling system
Beijing, China
UBS China HQ Data Center May 2006– Feb 2007 Beijing, China Chief Contractor - Finished project for UPS and cooling system - The first data center with indirect free cooling 2N redundancy system in Beijing - 2N 400KVA ups power supply and power distribution system; CNP. (France) Data Center Jan 2003 – April 2003 Beijing, China Project Manager - Project management - Design and construction management
China Century Stock Date Center Jan 2003 – April 2003 Chief Contractor - 800sqm, total cost HK$3.5M. - 2*60KVA UPS system 1+1 redundancy - Power distribution system - 6 sets CRAC N+1 redundancy - Water cool chiller include chill water pump and piping system - Fire alarm system and FM200 fire service system. - CCTV and security system - Data center BMS, include auto dialer alarm system.
Shenzhen, China
CSFB (Credit Swiss First Boston) Data Center Oct. 2001- Feb. 2002 Beijing, China - Plan, design and construction - Total cost HK$1.5M. - 2*30KVA UPS system 1+1 redundancy - Power distribution system - 2*22KW CRAC 1+1 redundancy and fan coils in office area. - Fire alarm system and FM200 fire service system include VESDA system. - Data center BMS, include auto dialer alarm system. i-link.net IDC Sept 2000 – Jan 2001 Beijing, China - Project management, plan, design and construction - 2000sqm, total cost HK$27M., - 2000A power panel & Busbar, - 1200KVA(2*300KVA + 3*200KVA) UPS & STS & PMM, - Power distribution system - 2*800KVA Gensets, - 19sets CRAC N+1 and fan coils in office area. - Fire alarm system and FM200 fire service system - CCTV and security system - Data center BMS MGE July 1995 – Sept 2000 Beijing, China Senior Engineer - Commissioning and testing of Stulz CRAC unit. - Training new technical engineer - Translate STULZ technical document. - North Korea nation communication department project. (1997.5-1997-7) - Write and published the book Computer Room Air Conditioning System in 1997. Concord realty group LTD. CO. Sept. 1992- July1995 - Center air-condition engineer - Manage Air-condition team of engineering division - Supervise construction of center air-condition systems
Beijing, China
PROFESSIONAL APPOINTMENTS China Communication Industry Standard June 2007 - Present Board member of drafting Technological Standards of Constant Temperature & Humidity Air Conditioning for Telecom Computer Room China National Standard Code June 2005 – Present Committee for authoring Room Design of Electronic Information System
China Ministry of Finance Training people to plan, design and build data center.
June 2003 – Sept 2003
Invited to write various books, book chapters, manuals, and teaching materials especially for computer room air conditioning section and fire service for computer rooms.