Report

:

CPMR055

Run by

:

Taneja, Manmeet

Report Date:

05-08-09 03:47 PM

CPMR055: Projects By Ward, Phase, Work Category, Work Type (Address-level Date Period) Project Status = Active, Completed Publication Status = Not Publ, Prev Publ, Publ Program = All Sub Program = All Department = Streets AND Sanitation Project Manager = All Bureau = All Constr Phase Only? = No Include Only Work Types of Selected Dept? = Yes Work Category = All Work Type = All Geography = Ward Geo Result = All Address Date Period = None From Date =

1/1/2008

To Date =

12/31/2008

Fund Source =All Report Type =Verification

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 2

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414

ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE

300 06 / 32146

ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE

300 06 / 32277

Projects .0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,746

100

1.0

05/01/07

10/31/07

3,900 06/29/07

07/27/07

2,342

100

ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE

.0

04/01/08

08/30/08

300 06 / 32146

ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE

.0

05/01/07

10/31/07

300 06 / 32277

ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE

.0

04/01/08

08/30/08

300 06 / 32146

ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE

.0

05/01/07

10/31/07

300 06 0308 / 5414

ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE

.0

02/01/06

210 06 0243 / 4480

N ASHLAND AVE AND W CHICAGO AVE

.0

12/27/06

210 06 0240 / 4477

N ASHLAND AVE AND W DIVISION ST

.0

281 00 / 33670

2717 N ELSTON AVE

.0

Totals per Design/Engineering

1.0

0

0

0

07/27/07

2,000

100

0

0

3,900 06/15/07

07/20/07

2,000

100

07/31/06

0 02/01/06

07/31/06

1,086

100

01/26/07

250 12/27/06

01/26/07

638

100

10/10/05

07/31/06

1,500 10/10/05

08/08/06

317

100

01/01/08

12/31/08

0

0

0

13,450

11,128

3,900 06/28/07 0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 3

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON N ARTESIAN AVE FROM W NORTH AVE TO W WABANSIA AVE

5.0

03/07/03

03/08/03

2,075 03/07/03

03/07/03

1,507

100

300 09 / 33067

ON N CLAREMONT AVE FROM W POTOMAC AVE TO W HIRSCH ST

4.0

10/22/08

10/24/08

1,600 10/22/08

10/24/08

1,002

100

300 07 0032 / 5455

ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST

8.0

04/18/06

11/18/06

3,200 09/22/06

10/10/06

1,616

100

300 05 0001 / 5116

ON N MARSHFIELD AVE FROM W NORTH AVE TO W WABANSIA AVE

5.0

04/04/05

11/18/05

2,000 07/30/05

08/05/05

0

100

300 07 0001 / 5424

ON N ROCKWELL ST FROM W NORTH AVE TO W BLOOMINGDALE AVE

8.0

12/01/06

11/23/06

3,200 12/01/06

11/23/06

3,200

100

300 07 0001 / 5424

ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE

5.0

11/01/06

11/24/06

2,000 12/01/06

11/23/06

2,000

100

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

.0

03/01/06

12/31/06

300 07 0032 / 5455

ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

1,600 09/22/06

10/10/06

300 05 0001 / 5116

ON N WINNEBAGO AVE FROM W MOFFAT ST TO N WESTERN AVE

7.0

04/04/05

11/18/05

2,800 07/30/05

300 07 0032 / 5455

ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

1,600 09/22/06

300 09 / 33067

ON W BLOOMINGDALE AVE FROM N WINNEBAGO AVE TO N ROCKWELL ST

8.0

06/16/08

06/20/08

5.0

04/04/05

10.56

12/01/03

0

0

0

808

100

08/05/05

0

100

10/10/06

808

100

3,200 06/16/08

06/20/08

2,008

100

11/18/05

2,000 07/30/05

08/05/05

0

100

12/01/03

4,224 11/15/03

11/20/03

4,290

100

1,875 01/10/03

01/10/03

2,590

100

300 05 0001 / 5116

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W CHESTNUT ST FROM N GREENVIEW AVE TO N ASHLAND AVE

300 06 0122 / 5275

ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE

300 06 0069 / 5233

ON W CORTEZ ST FROM N CAMPBELL AVE TO N CALIFORNIA AVE

300 07 0032 / 5455

ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE

7.50

04/18/06

11/18/06

3,000 09/22/06

10/10/06

1,515

100

300 05 0001 / 5116

ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST

4.0

04/04/05

11/18/05

1,600 07/30/05

08/05/05

0

100

300 05 0001 / 5116

ON W FRY ST FROM N GREENVIEW AVE TO N ASHLAND AVE

5.0

04/04/05

11/18/05

2,000 07/30/05

08/05/05

0

100

300 09 / 33067

ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE

3.50

06/16/08

06/20/08

1,400 06/16/08

06/20/08

879

100

300 07 0032 / 5455

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST 3.50

04/18/06

11/18/06

1,400 09/22/06

10/10/06

707

100

300 07 0001 / 5424

ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE

5.0

04/18/06

11/18/06

2,200 04/18/06

11/18/06

2,200

100

300 05 0001 / 5116

ON W PEARSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE

5.0

04/04/05

11/18/05

2,000 07/30/05

08/05/05

0

100

300 07 0032 / 5455

ON W SUPERIOR ST FROM N LEAVITT ST TO N OAKLEY BLVD

2.0

04/18/06

11/18/06

800 09/22/06

10/10/06

404

100

300 09 / 33067

ON W THOMAS ST FROM N ROCKWELL ST TO N CALIFORNIA AVE

7.0

06/16/08

06/20/08

2,800 06/16/08

06/20/08

1,757

100

302 00 0092 / 5774

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 1700 N CAMPBELL AVE

1.0

01/13/03

01/13/03

225 01/10/03

01/10/03

203

100

302 00 0092 / 5774

826 N PAULINA ST

1.0

02/09/03

02/09/03

225 02/07/03

02/07/03

203

100

302 00 0092 / 5774

1543 W CHESTNUT ST

1.0

0 01/30/01

01/30/01

203

100

302 00 0092 / 5774

2500 W CORTEZ ST

1.0

0 01/16/02

01/16/02

203

100

300 11 / 32190

2702 W CORTEZ ST

.0

0

0

5.0

03/01/07

12/31/07

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 4

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

210 06 0022 / 4297

2701-2753 W HADDON AVE

5.0

0 02/21/02

02/21/02

1,875

100

300 06 0069 / 5233

2701-2753 W HADDON AVE

5.0

1,875 02/21/02

02/21/02

1,875

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

135.06

50,899

31,853

Fixtures

300 03 0033 / 4904

ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE

6.30

03/10/05

03/20/05

2,520

300 07 0032 / 5455

ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

1,600 09/07/06

10/10/06

808

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

23.80

0

9,520

3,535

2,967,039

1,916,761

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 5

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0092 / 5774

835 N ASHLAND AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1010 N ASHLAND AVE

1.0

0 12/10/01

12/10/01

236

100

302 00 0092 / 5774

1216 N CLEAVER ST

1.0

0 10/19/01

10/19/01

236

100

805 06 1481 / 7667

1530 N ELK GROVE AVE

1.0

0 12/02/97

12/02/97

300

100

302 00 0092 / 5774

1306 N GREENVIEW AVE

1.0

0 12/14/01

12/14/01

236

100

302 00 0092 / 5774

1039 N HONORE ST

1.0

0 11/07/01

11/07/01

236

100

805 06 1868 / 8054

862 N MARSHFIELD AVE

1.0

09/29/95

09/29/95

0 09/29/95

09/29/95

300

100

805 06 1736 / 7922

1428 N MILWAUKEE AVE

1.0

06/11/97

06/11/97

0 06/11/97

06/11/97

300

100

300 06 0139 / 5289

2137 N MILWAUKEE AVE

1,080.0

03/01/06

09/01/06

26,704 05/22/06

06/01/06

32,631

100

805 06 1920 / 8106

1631 N MOZART ST

1.0

04/08/96

04/08/96

0 04/08/96

04/08/96

300

100

302 00 0092 / 5774

1216 N NOBLE ST

1.0

0 10/19/01

10/19/01

236

100

805 06 0447 / 6633

2145 N STAVE ST

1.0

0 06/01/95

06/01/95

300

100

302 00 0092 / 5774

1403 N WICKER PARK AVE

1.0

0 08/22/01

08/22/01

236

100

805 06 1737 / 7923

1501 N WICKER PARK AVE

1.0

0 06/11/97

06/11/97

300

100

302 00 0092 / 5774

1053 N WINCHESTER AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1142 N WOLCOTT AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1339 N WOLCOTT AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1100 N WOOD ST

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1208 N WOOD ST

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1506 N WOOD ST

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

2735 W ARMITAGE AVE

1.0

0 05/08/01

05/08/01

236

100

302 00 0092 / 5774

1600 W BEACH AVE

1.0

0 03/26/01

03/26/01

236

100

302 00 0092 / 5774

1632 W BEACH AVE

1.0

0 10/19/01

10/19/01

236

100

302 00 0092 / 5774

1607 W CHICAGO AVE

1.0

0 10/19/01

10/19/01

236

100

302 00 0092 / 5774

1855 W CHICAGO AVE

1.0

0 07/17/01

07/17/01

236

100

302 00 0092 / 5774

1424 W DIVISION ST

1.0

0 10/19/01

10/19/01

236

100

805 06 2086 / 8272

1652 W DIVISION ST

1.0

0 08/28/96

08/28/96

300

100

302 00 0092 / 5774

1807 W DIVISION ST

1.0

0 10/19/01

10/19/01

236

100

302 00 0092 / 5774

2006 W DIVISION ST

1.0

0 03/29/01

03/29/01

236

100

805 06 1775 / 7961

2006 W DIVISION ST

1.0

0 04/16/97

04/16/97

300

100

302 00 0092 / 5774

1901 W ERIE ST

1.0

0 12/10/01

12/10/01

236

100

12/02/97

06/01/95

06/11/97

08/28/96

04/16/97

12/02/97

06/01/95

06/11/97

08/28/96

04/16/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 6

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0092 / 5774

2344 W ERIE ST

1.0

805 06 1139 / 7325

2654 W HOMER ST

1.0

302 00 0092 / 5774

2330 W HURON ST

1.0

805 06 1914 / 8100

2624 W NORTH AVE

1.0

03/08/96

805 06 1915 / 8101

2634 W NORTH AVE

1.0

11/16/95

302 00 0092 / 5774

1635 W PIERCE AVE

1.0

805 06 0584 / 6770

2725 W PRINDIVILLE ST

1.0

06/01/95

805 06 0450 / 6636

1701 W SUPERIOR ST

1.0

10/04/95

302 00 0092 / 5774

2026 W SUPERIOR ST

302 00 0092 / 5774

0 12/10/01

12/10/01

236

100

0 03/23/95

03/23/95

300

100

0 12/10/01

12/10/01

236

100

03/08/96

0 03/08/96

03/08/96

300

100

11/16/95

0 11/16/95

11/16/95

300

100

0 11/28/01

11/28/01

236

100

06/01/95

0 06/01/95

06/01/95

300

100

10/04/95

0 10/04/95

10/04/95

300

100

1.0

0 06/27/01

06/27/01

236

100

1814 W THOMAS ST

1.0

0 11/28/01

11/28/01

236

100

805 06 1690 / 7876

2637 W THOMAS ST

1.0

07/02/97

07/02/97

0 07/02/97

07/02/97

300

100

805 06 0365 / 6551

2219 W WABANSIA AVE

1.0

08/29/96

08/29/96

0 08/29/96

08/29/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

2058 N WESTERN AVE

Work Type: Arterial Strt Lighting/Lamps

03/23/95

03/23/95

1,122.0

26,704

43,503

Lamps 1,540.0

06/01/07

12/31/07

45,337 07/01/07

09/01/07

45,337

100

3,500 11/21/06

11/21/06

Blocks

300 07 0001 / 5424

ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE

.50

04/18/06

11/18/06

0

100

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

.0

03/01/06

12/31/06

0

0

0

300 11 / 32190

2702 W CORTEZ ST

.0

03/01/07

12/31/07

0

0

0

3,500

0

Totals per Arterial Strt Lighting/Lamps

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1951 W DIVISION ST

.50

Installations 1,510.0

0 05/08/02

05/11/02

27,494

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 7

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install 300 06 0198 / 5323

LATHROP HOMES

300 06 0167 / 5306

N FRANCISCO AVE AND W WABANSIA AVE

300 06 0167 / 5306

Fixtures 215,250 03/29/01

04/04/01

67,170

100

2.50

0 06/01/99

06/01/99

539

100

2600 N HOYNE AVE

2.0

0 05/19/99

05/19/99

702

100

302 00 0092 / 5774

1701 N MOZART ST

1.0

0 03/14/01

03/14/01

471

100

302 00 0092 / 5774

2215 W NORTH AVE

1.0

0 03/16/01

03/16/01

471

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

03/12/01

6.50

.0

Work Type: Lighting Imprvmnts

Installations

2717 N ELSTON AVE

.0

Work Type: Lighting Imprvmnts

Projects

300 06 0117 / 5271

2800 N DAMEN AVE

Work Type: Loop Lighting 281 00 / 33670

2717 N ELSTON AVE

Work Type: Ornamental - Piggyback Lighting

215,250

69,353

Blocks

2717 N ELSTON AVE

281 00 / 33670

04/10/01

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

4,000

0

0

0

0

1.0

Blocks .0

01/01/08

12/31/08

Fixtures

300 07 0032 / 5455

ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

5,400 09/22/06

10/10/06

3,425

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 11 / 32222

ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST

13.86

11/01/07

12/01/07

18,843 03/13/08

04/04/08

17,538

100

300 06 0122 / 5275

ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE

10.56

12/01/03

12/06/03

14,256 11/28/03

12/04/03

14,709

100

Totals per Ornamental - Piggyback Lighting

41.92

56,724

47,231

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 8

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting

Blocks

300 11 / 32190

ON N ASHLAND AVE FROM W DIVISION ST TO N MILWAUKEE AVE

2.0

06/20/07

07/03/07

13,000 06/20/07

07/03/07

10,342

100

300 11 / 32190

ON N MILWAUKEE AVE FROM N PAULINA ST TO N DAMEN AVE

2.0

08/27/07

09/27/07

150,000 08/27/07

09/07/07

149,999

100

300 06 0119 / 5273

1200 N ASHLAND AVE

1.0

06/01/99

12/01/99

160,000 05/13/99

12/14/99

123,364

100

281 00 / 33670

2717 N ELSTON AVE

.0

01/01/08

12/31/08

0

0

0

300 11 / 32190

2702 W CORTEZ ST

.0

03/01/07

12/31/07

0

0

0

323,000

283,705

Totals per Ornamental Lighting

Work Type: POD Camera Pole 281 00 / 33670

2717 N ELSTON AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

2058 N WESTERN AVE

5.0

Poles .0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Lamps .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 9

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 11 / 32190

ON N DAMEN AVE FROM W SCHILLER ST TO W EVERGREEN AVE

1.0

05/30/07

07/20/07

58,750 05/30/07

07/17/07

36,740

100

300 11 / 32190

ON N HONORE ST FROM N WICKER PARK AVE TO N MILWAUKEE AVE

1.0

05/30/07

07/20/07

48,750 05/30/07

07/17/07

36,740

100

300 11 / 32190

ON N HONORE ST FROM W DIVISION ST TO W ELLEN ST

1.0

02/21/08

04/21/08

55,000

0

0

300 11 / 32190

ON N MARION CT FROM W DIVISION ST TO W ELLEN ST

1.0

02/21/08

04/21/08

55,000

0

0

300 07 0001 / 5424

ON N POINT ST FROM W ARMITAGE AVE TO W HENRY CT

1.0

06/28/06

08/31/06

65,000 07/07/06

10/24/06

65,000

100

300 06 0298 / 5405

ON N STAVE ST FROM W ARMITAGE AVE TO W FRANCIS PL

2.0

06/25/05

08/01/05

0 08/22/05

10/14/05

102,254

100

300 06 0308 / 5414

ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE

2.0

06/06/06

07/01/06

150,000 07/07/06

10/24/06

126,534

100

300 11 / 32190

ON N WICKER PARK AVE FROM N WOOD ST TO N DAMEN AVE

1.0

05/30/07

07/20/07

62,500 05/30/07

07/17/07

36,470

100

300 06 / 32146

ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE

2.0

12/05/07

05/29/08

282,042

0

25

300 06 / 32277

ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE

.0

05/04/08

12/31/08

0

0

0

300 07 0001 / 5424

ON W ATTRILL ST FROM N MILWAUKEE AVE TO N STAVE ST

1.0

06/28/06

08/31/06

32,000

100

300 06 / 32146

ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE

1.50

12/05/07

06/26/08

282,042

0

25

300 06 / 32277

ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE

.0

05/04/08

12/31/08

0

0

0

300 07 0001 / 5424

ON W EVERGREEN AVE FROM N MILWAUKEE AVE TO N DAMEN AVE

1.0

08/01/06

10/01/06

300 07 0001 / 5424

ON W FRANCIS PL FROM N MILWAUKEE AVE TO N POINT ST

1.0

06/28/06

08/31/06

300 06 / 32146

ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE

2.0

10/05/07

01/31/08

300 07 0001 / 5424

ON W PRINDIVILLE ST FROM N MILWAUKEE AVE TO N STAVE ST

1.0

06/28/06

08/31/06

300 07 0001 / 5424

ON W ST GEORGES CT FROM N MILWAUKEE AVE TO N STAVE ST

1.0

06/28/06

300 06 0308 / 5414

ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE

.50

300 11 / 32190

2702 W CORTEZ ST

.0

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 03 0001 / 4872

ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE

300 03 0035 / 4906

ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE

300 06 0235 / 5349

ON N WASHTENAW AVE FROM N ELSTON AVE TO W BELMONT AVE

300 06 0235 / 5349

32,000 07/07/06

10/24/06

85,000 09/11/06

11/15/06

87,303

100

39,000 07/07/06

10/24/06

39,000

100

02/18/08

0

100

32,000 07/07/06

10/24/06

32,000

100

08/31/06

32,000 07/07/06

10/24/06

32,000

100

03/09/06

05/09/06

49,164 03/09/06

04/28/06

31,842

100

03/01/07

12/31/07

0

0

0

1,610,290

657,883

21.0

282,042

Blocks 06/01/04

09/01/04

40,000 05/29/04

07/09/04

40,000

100

06/01/04

09/01/04

40,000 05/24/04

07/09/04

40,000

100

1.0

09/06/03

11/06/03

77,813 09/10/03

11/06/03

68,263

100

ON W FLETCHER ST FROM N ELSTON AVE TO N ROCKWELL ST

1.0

09/06/03

11/06/03

77,813 09/10/03

11/06/03

68,264

100

300 06 0267 / 5375

ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE

1.0

07/20/04

09/20/04

80,185 07/12/04

10/15/04

90,227

100

300 03 0032 / 4903

ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST

1.50

10/01/04

12/15/04

92,500 10/08/04

01/21/05

42,715

100

Totals per Residntl Strt Lighting/Lamps

.50

5.0

408,311

349,469

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 10

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Arterial 281 00 / 33670

Locations

2717 N ELSTON AVE

Work Type: Short Arm Installs - Residntl 281 00 / 33670

2717 N ELSTON AVE

302 00 0092 / 5774

2000 W SUPERIOR ST

.0

12/31/08

0

01/01/08

12/31/08

0

0

0

Locations .0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

01/01/08

3.0

0 01/03/01

3.0

0

01/03/01

0

0

1,135

100

1,135

Locations

300 11 / 32190

ON N ASHLAND AVE FROM N MILWAUKEE AVE TO W DIVISION ST

13.0

06/20/07

06/20/07

3,250 07/03/07

300 03 0033 / 4904

ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE

7.49

03/01/05

03/20/05

1,988

300 07 0001 / 5424

ON N ELK GROVE AVE FROM N WOOD ST TO W NORTH AVE

11.0

04/18/06

11/18/06

1,200 06/01/06

06/10/06

0

100

300 07 0001 / 5424

ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE

5.0

09/21/06

09/28/06

1,000 08/22/06

08/22/06

721

100

300 04 0216 / 5114

ON N WESTERN AVE FROM W BLOOMINGDALE AVE TO W HOMER ST

19.0

05/01/06

11/01/06

4,110 05/17/06

07/24/06

4,110

100

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

.0

03/01/06

12/31/06

300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

4.95

05/15/07

06/01/07

1,089 05/15/07

300 05 0001 / 5116

ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST

31.0

04/04/05

11/18/05

300 07 0001 / 5424

ON W HURON ST FROM N ASHLAND AVE TO N WOOD ST

9.0

04/18/06

11/18/06

300 07 0001 / 5424

ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE

5.0

04/18/06

11/18/06

300 11 / 32190

2702 W CORTEZ ST

.0

03/01/07

12/31/07

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

2717 N ELSTON AVE

Work Type: Strt Lighting

105.44

07/03/07

2,600

100

0

0

0

0

06/01/07

1,089

100

6,200 07/25/05

08/20/05

4,415

100

1,800 06/01/06

07/01/06

0

0

1,000

0

0

0

0

0

21,637

12,935

0

0

0

Blocks .0

01/01/08

12/31/08

Blocks

300 06 0111 / 5266

ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE

.52

08/01/00

09/30/00

0 11/01/98

12/15/98

5,504

100

300 03 0001 / 4872

2700 N ARTESIAN AVE

1.0

10/15/04

10/25/04

2,075 10/15/04

10/15/04

1,348

100

300 06 0117 / 5271

2033-2049 W DIVERSEY AVE

.50

13,110 10/23/99

11/30/99

9,425

2.02

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

2137 N MILWAUKEE AVE

15,185

16,277

Lamps 1,712.0

03/01/04

12/01/04

8,902 09/26/06

09/28/06

18,644

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 11

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2788 / 8974

1799 N ARTESIAN AVE

6.0

03/31/94

03/31/94

0 03/31/94

03/31/94

4,500

100

805 06 2928 / 9114

1795 N CALIFORNIA AVE

6.0

03/18/94

03/18/94

0 03/18/94

03/18/94

4,500

100

805 06 2300 / 8486

2895 N CALIFORNIA AVE

12.0

06/20/96

06/20/96

0 06/20/96

06/20/96

9,000

100

805 06 2789 / 8975

1799 N CAMPBELL AVE

6.0

06/01/94

06/01/94

0 06/01/94

06/01/94

4,500

100

300 06 0217 / 5337

3181 N ELSTON AVE

193.0

12/29/03

01/09/04

10,848 12/30/03

01/02/04

14,760

100

805 06 2744 / 8930

1798 N FAIRFIELD AVE

6.0

06/09/94

06/09/94

0 06/09/94

06/09/94

4,500

100

805 06 2790 / 8976

1799 N MAPLEWOOD AVE

6.0

04/07/94

04/07/94

0 04/07/94

04/07/94

4,500

100

805 06 2765 / 8951

1774 N MILWAUKEE AVE

10.0

04/22/94

04/22/94

0 04/22/94

04/22/94

7,500

100

805 06 2362 / 8548

1795 N ROCKWELL ST

10.0

10/03/95

10/03/95

0 10/03/95

10/03/95

7,500

100

805 06 2476 / 8662

1795 N TALMAN AVE

10.0

10/06/95

10/06/95

0 10/06/95

10/06/95

7,500

100

805 06 2743 / 8929

1798 N WASHTENAW AVE

6.0

06/01/94

06/01/94

0 06/01/94

06/01/94

4,500

100

805 06 2223 / 8409

1798 N WESTERN AVE

6.0

12/09/96

12/09/96

0 12/09/96

12/09/96

4,500

100

805 06 2640 / 8826

1798 N WINNEBAGO AVE

8.0

12/14/94

12/14/94

0 12/14/94

12/14/94

6,000

100

302 00 0071 / 5759

2600 W DIVERSEY AVE

0 10/20/98

10/28/98

10,473

100

805 06 2363 / 8549

2640 W DIVERSEY AVE

300 06 0099 / 5260

1951 W DIVISION ST

302 00 0070 / 5758

2200 W FULLERTON AVE

302 00 0072 / 5760

2200 W FULLERTON AVE

302 00 0071 / 5759

2430 W LOGAN BLVD

805 06 2711 / 8897

2301 W MOFFAT ST

6.0

12/31/91

805 06 2421 / 8607

1525 W NORTH AVE

14.0

10/01/91

Totals per Underpass Lighting

12.0

06/01/92

06/01/92

0 06/01/92

06/01/92

9,000

100

2,792.0

06/01/03

07/09/03

156,932 07/01/03

07/10/03

103,719

100

0 06/12/97

06/19/97

14,272

100

0 09/28/99

10/19/99

38,301

100

0 03/01/98

03/26/98

33,883

100

12/31/91

0 12/31/91

12/31/91

4,500

100

10/01/91

0 10/01/91

10/01/91

10,500

100

1.0

3,110.0

167,780

308,408

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 12

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N ELSTON AVE AND N LEAVITT ST

.50

0 10/24/02

10/24/02

5,037

100

210 06 0219 / 4459

N WESTERN AVE AND N MILWAUKEE AVE

1.0

03/31/05

04/01/05

10,563 04/01/05

04/01/05

10,489

100

210 06 0219 / 4459

N WESTERN AVE AND W ARMITAGE AVE

.50

04/01/05

04/02/05

5,282 04/07/05

04/07/05

4,523

100

210 06 0219 / 4459

N WESTERN AVE AND W CHICAGO AVE

.50

04/15/05

04/15/05

5,282 04/10/05

04/10/05

4,004

100

210 06 0219 / 4459

N WESTERN AVE AND W DIVISION ST

.50

03/28/05

03/29/05

5,282 03/16/05

03/16/05

5,042

100

210 06 0219 / 4459

N WESTERN AVE AND W FULLERTON AVE

.50

04/04/05

04/05/05

5,282 03/25/05

03/25/05

4,523

100

210 06 0219 / 4459

N WESTERN AVE AND W NORTH AVE

1.0

03/30/05

03/31/05

10,563 03/04/05

03/04/05

8,008

100

210 06 0219 / 4459

N WESTERN AVE AND W POTOMAC AVE

.50

03/29/05

03/30/05

5,282 03/08/05

03/08/05

3,824

100

210 06 0219 / 4459

N WESTERN AVE AND W SCHUBERT AVE

1.0

04/07/05

04/08/05

10,563 03/10/05

03/10/05

8,527

100

210 06 0219 / 4459

W LOGAN BLVD AND N WESTERN AVE

1.0

04/06/05

04/07/05

10,563 03/18/05

03/18/05

15,333

100

7.0

Totals per LED Signal Head Install

Work Type: New Signal

68,660

69,309

Locations

210 06 0171 / 4420

N ASHLAND AVE AND W DIVISION ST

1.0

07/09/07

08/08/07

138,240 05/01/07

05/25/07

117,195

100

300 11 / 32190

W CHICAGO AVE AND N WOLCOTT AVE

1.0

10/01/07

12/01/07

300,000 01/10/08

07/21/08

265,845

100

300 11 / 32190

2702 W CORTEZ ST

.0

03/01/07

12/31/07

0

0

0

438,240

383,040

2.0

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

N ASHLAND AVE AND W CHICAGO AVE

210 06 0240 / 4477

10713013 Note Last Updated on 03-APR-08 N ASHLAND AVE AND W DIVISION ST

Locations .0

03/15/06

05/08/07

6,000 01/26/07

02/09/07

2,994

100

8.0

11/01/05

06/22/07

15,000 11/01/05

10/03/06

10,562

100

Completed by Operations Division on 10/3/06 Note Last Updated on 30-MAY-07 Totals per Pedestrian Countdown Signal Install

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N OAKLEY AVE AND W DIVISION ST

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

1514 N ASHLAND AVE

8.0

21,000

13,556

Crossings .50

2,000 07/11/01

07/12/01

131

100

0 09/20/03

10/01/03

5,376

100

Intersections 34.0

10/01/03

10/08/03

574,184

1,305,586

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 13

1/1/2008 AND 12/31/2008

Ward 01 Manuel Flores CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

300 06 0199 / 5324

N WESTERN AVE AND W POTOMAC AVE

.50

9,573 02/26/01

04/27/01

79,240

100

300 09 / 33067

W CHICAGO AVE AND N WOLCOTT AVE

1.0

08/19/08

08/29/08

32,000 08/19/08

08/29/08

32,000

100

814 06 0153 / 16367

1200 N CLEAVER ST

1.0

09/03/96

09/03/96

0 09/03/96

09/03/96

87,656

100

814 06 0283 / 16495

2700 N ELSTON AVE

1.0

11/29/91

11/29/91

0 11/29/91

11/29/91

123,207

100

814 06 0284 / 16496

2800 N ELSTON AVE

1.0

12/04/91

12/04/91

0 12/04/91

12/04/91

123,207

100

814 06 0285 / 16497

3000 N ELSTON AVE

1.0

12/06/91

12/06/91

0 12/06/91

12/06/91

123,207

100

814 06 0201 / 16413

3000 N LEAVITT ST

1.0

03/17/92

03/17/92

0 03/17/92

03/17/92

106,743

100

300 06 0117 / 5271

1200 N NOBLE ST

1.0

814 06 0051 / 16268

2667 W DIVERSEY AVE

1.0

03/02/95

03/02/95

0 03/02/95

03/02/95

61,595

100

814 06 0086 / 16302

2668 W DIVERSEY AVE

1.0

09/28/94

09/28/94

0 09/28/94

09/28/94

49,756

100

814 06 0122 / 16336

1500 W NORTH AVE

1.0

09/13/93

09/13/93

0 09/13/93

09/13/93

46,166

100

2,000

10.50

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

300 05 0001 / 5116

ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST

300 11 / 32190

2702 W CORTEZ ST

686

43,573

833,463

Locations 1.65

05/15/07

06/01/07

512 05/15/07

06/01/07

512

100

1.0

04/04/05

11/18/05

200 07/25/05

08/20/05

200

100

.0

03/01/07

12/31/07

0

0

0

712

712

Totals per Construction Phase

3,541,223

3,222,347

Totals for Ward 01

3,554,673

3,233,475

Totals per Traffic Equipment Painting

2.65

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 14

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0300 / 5407

ABLA HOMES (CHA)

300 06 0289 / 5396

ROCKWELL GARDENS

300 05 0002 / 5117

Projects .0

01/15/05

04/15/05

0 01/15/05

09/30/05

23,208

100

1.0

12/01/04

02/28/05

0 12/01/04

07/26/06

1,984

100

ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST

.0

08/06/06

08/07/06

0 08/06/06

08/07/06

0

0

300 06 0308 / 5414

ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,389

100

300 06 0308 / 5414

ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

274

100

300 05 0002 / 5117

ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST

.0

08/06/06

08/07/06

0 08/06/06

08/07/06

0

0

210 06 0240 / 4477

E VAN BUREN ST AND S MICHIGAN AVE

.0

10/10/05

07/31/06

1,200 10/10/05

09/13/06

940

100

300 06 0292 / 5399

S CANAL ST AND W 14TH PL

1.0

5,000 04/26/05

12/10/05

1,065

100

210 06 0209 / 4452

S CANAL ST AND W ROOSEVELT RD

1.0

07/01/04

12/31/04

0 07/01/04

12/31/04

4,921

100

210 06 0240 / 4477

S CLARK ST AND W CONGRESS PKWY

.0

10/10/05

07/31/06

1,200 10/10/05

02/15/06

235

100

300 06 0292 / 5399

S JEFFERSON ST AND W 14TH PL

210 06 0207 / 4450

S MICHIGAN AVE AND E JACKSON BLVD

.0

07/01/04

12/30/04

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

300 06 0278 / 5386

1400 S BLUE ISLAND AVE

.0

07/01/04

09/30/04

300 06 0292 / 5399

1101 S CANAL ST

1.0

02/03/05

03/08/05

2,000 01/13/05

300 06 0292 / 5399

607 S JEFFERSON ST

1.0

03/03/05

03/10/05

1,500 03/03/05

300 06 0292 / 5399

1240 S LEAVITT ST

1.0

03/15/05

03/19/05

3,000 03/15/05

300 06 0292 / 5399

610 S MICHIGAN AVE

1.0

300 06 0292 / 5399

1620 S MICHIGAN AVE

1.0

300 06 0292 / 5399

409 S MORGAN ST

1.0

300 06 0282 / 5390

1600 S PRAIRIE AVE

1.0

12/06/04

300 06 0292 / 5399

225 S SANGAMON ST

1.0

300 06 0292 / 5399

1255 S STATE ST

300 06 0282 / 5390

1,454

25

460

100

0

0

0

0

0

0

835

80

03/10/05

979

100

05/11/05

1,274

100

4,000 07/25/05

08/31/05

0

100

1,000 10/24/04

10/28/04

336

100

1,000 06/06/05

07/22/05

603

100

01/05/05

3,000 12/01/04

03/09/05

2,707

100

05/26/05

07/19/05

1,500 05/26/05

07/19/05

634

100

1.0

07/25/05

07/25/05

2,000 07/25/05

07/25/05

896

100

550 W ADAMS ST

.0

08/20/04

12/31/04

1,000 08/20/04

12/31/04

1,000

100

300 06 0292 / 5399

550 W ADAMS ST

.0

01/20/05

12/21/05

0 01/20/05

01/17/06

0

100

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

300 06 0292 / 5399

520 W ROOSEVELT RD

.0

01/24/05

03/01/05

1,500 01/24/05

04/15/05

0

0

150 06 / 32900

1065-1400 W ROOSEVELT RD

.0

12/06/06

08/24/07

66,000 05/16/07

10/11/07

50,000

100

Totals per Design/Engineering

1.0

13.0

3,000 04/16/05

10/24/04

10/28/04

750 09/02/04

98,650

09/10/04

96,194

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 15

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0002 / 5425

ON S INDIANA AVE FROM E 16TH ST TO E 18TH ST

4.0

04/18/06

11/18/06

1,400

0

0

300 07 0002 / 5425

ON S MICHIGAN AVE FROM E 16TH ST TO E 18TH ST

4.0

04/18/06

11/18/06

1,400

0

0

Totals per 250 Watt Changeout Totals per Lighting/Electrical

8.0

2,800

0

5,938,898

4,502,081

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 16

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 09 / 33068

ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE

3.0

01/28/09

02/02/09

1,200 01/28/09

02/02/09

958

100

300 09 / 33068

ON E 14TH PL FROM S STATE ST TO S WABASH AVE

2.0

01/28/09

02/02/09

800 01/28/09

02/02/09

644

100

300 09 / 33068

ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE

4.0

05/27/08

06/13/08

1,600 07/09/08

07/10/08

1,283

100

300 09 / 33068

ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

06/16/08

06/20/08

400 07/18/08

09/02/08

322

100

300 09 / 33068

MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

06/16/08

06/20/08

400 07/18/08

07/21/08

322

100

300 09 / 33068

MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

8.16

05/28/08

06/20/08

3,400 05/28/08

06/06/08

2,555

100

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

8.60

05/28/08

06/20/08

3,612 04/01/08

12/01/08

2,692

100

300 09 / 33068

ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE

9.0

05/29/08

06/20/08

3,600 07/09/08

07/10/08

2,880

100

300 09 / 33068

ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST

9.0

05/29/08

06/20/08

3,600 07/09/08

07/10/08

2,880

100

300 09 / 33068

ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST

4.0

06/02/08

06/13/08

1,800 06/02/08

06/05/08

1,288

100

300 06 0251 / 5361

ON S CLINTON ST FROM W HARRISON ST TO W POLK ST

12.0

08/15/05

08/20/05

4,800 08/10/05

08/15/05

5,037

100

300 09 / 33068

ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST

3.0

10/15/08

10/17/08

1,200 10/15/08

10/17/08

966

100

300 09 / 33068

ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST

17.0

03/28/08

04/04/08

6,800 03/28/08

04/04/08

5,474

100

300 09 / 33068

ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST

12.0

300 09 / 33068

ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST

15.0

12/17/08

01/23/09

6,000 12/17/08

300 09 / 33068

ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST

300 09 / 33068

ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST

300 06 0225 / 5340

ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD

300 06 0251 / 5361

ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST

300 09 / 33068

ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST

300 09 / 33068

4,800

0

0

01/23/09

4,830

100

8.0

03/28/08

04/04/08

3,200 03/28/08

04/04/08

2,576

100

7.38

05/29/08

06/20/08

2,952 04/01/08

12/01/08

2,310

100

100.0

09/01/03

09/10/03

40,000 09/02/03

09/09/03

32,580

100

13.0

08/15/05

08/20/05

5,200 08/10/05

08/15/05

5,037

100

9.0

12/01/08

12/09/08

3,600 12/01/08

12/03/08

3,398

100

ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD

13.0

01/05/09

01/30/09

5,200 01/12/09

01/22/09

6,434

100

300 07 0002 / 5425

ON S MICHIGAN AVE FROM E ROOSEVELT RD TO E 14TH ST

12.0

04/18/06

11/18/06

5,150 06/21/06

06/21/06

0

100

300 06 0122 / 5275

ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST

6.0

08/01/04

08/15/04

2,500 06/10/04

06/10/04

1,506

100

300 09 / 33068

ON S WABASH AVE FROM E 23RD ST TO E 24TH PL

5.0

06/16/08

06/20/08

2,000 06/16/08

06/20/08

1,610

100

300 09 / 33068

ON S WABASH AVE FROM E 29TH ST TO E 30TH ST

5.0

06/16/08

06/20/08

2,000 07/10/08

07/15/08

1,610

100

300 09 / 33068

MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST

3.0

06/09/08

06/13/08

1,400 06/09/08

06/13/08

966

100

300 09 / 33068

ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY

25.0

12/08/08

12/29/08

10,000 12/08/08

12/29/08

8,561

100

300 09 / 33068

ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD

4.50

06/09/08

06/13/08

1,800 06/09/08

06/13/08

1,449

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 17

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 09 / 33068

ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE

17.0

12/18/08

01/08/09

6,800 12/18/08

01/08/09

3,719

100

300 09 / 33068

ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST

12.0

01/08/09

02/20/09

4,800 01/08/09

02/20/09

4,760

100

300 06 0251 / 5361

ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST

13.0

08/15/05

08/20/05

5,200 08/10/05

08/15/05

5,037

100

300 07 0002 / 5425

ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD

42.0

04/18/06

11/18/06

17,150 10/20/06

10/21/06

0

100

300 09 / 33068

ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST

10.0

07/07/08

07/11/08

4,000 07/07/08

07/11/08

3,220

100

300 06 0251 / 5361

ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST

13.0

08/15/05

08/20/05

5,200 08/10/05

08/15/05

5,037

100

300 09 / 33068

ON W POLK ST FROM S DEARBORN ST TO S CLARK ST

1.0

03/28/08

04/04/08

414 03/28/08

04/04/08

322

100

300 09 / 33068

ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE

2.0

10/13/08

10/17/08

800 10/06/08

10/08/08

800

100

300 09 / 33091

ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST

4.0

02/01/08

12/31/08

1,600 09/08/08

09/09/08

1,328

100

300 09 / 33068

ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE

7.0

06/09/08

06/13/08

3,000 06/09/08

06/13/08

2,254

100

300 09 / 33068

1400-1500 S LOOMIS ST

6.0

06/30/08

07/01/08

2,400 08/07/08

08/12/08

1,932

100

Totals per 400 Watt Changeout

446.64

180,378

128,577

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 18

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0095 / 5777

ON S STATE ST FROM E VAN BUREN ST TO W CONGRESS PKWY

17.0

12,750 04/11/01

04/16/01

16,763

100

302 00 0092 / 5774

ON W WASHBURNE AVE FROM S DAMEN AVE TO S LEAVITT ST

9.0

0 04/03/01

04/04/01

2,121

100

302 00 0095 / 5777

72 E ROOSEVELT DR

5.0

3,750 12/05/97

12/09/97

4,542

100

805 06 0749 / 6935

1300 S ASHLAND AVE

1.0

10/26/95

10/26/95

0 10/26/95

10/26/95

300

100

805 06 1521 / 7707

615 S CALIFORNIA AVE

1.0

10/31/97

10/31/97

0 10/31/97

10/31/97

300

100

805 06 1522 / 7708

625 S CALIFORNIA AVE

1.0

10/31/97

10/31/97

0 10/31/97

10/31/97

300

100

302 00 0095 / 5777

520 S FEDERAL ST

8.0

6,000 11/19/97

11/19/97

7,267

100

302 00 0095 / 5777

130 S FRANKLIN ST

3.0

2,250 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

230 S FRANKLIN ST

1.0

750 10/23/02

10/29/02

400

100

805 06 1190 / 7376

1320 S INDIANA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1191 / 7377

1340 S INDIANA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1192 / 7378

1360 S INDIANA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1542 / 7728

1603 S INDIANA AVE

1.0

10/23/97

10/23/97

0 10/23/97

10/23/97

300

100

805 06 1543 / 7729

1607 S INDIANA AVE

1.0

10/23/97

10/23/97

0 10/23/97

10/23/97

300

100

302 00 0095 / 5777

410 S MICHIGAN AVE

14.0

10,500 06/14/00

06/20/00

6,481

100

302 00 0095 / 5777

600 S MICHIGAN AVE

6.0

4,500 11/29/97

12/03/97

5,671

100

302 00 0095 / 5777

820 S MICHIGAN AVE

3.0

2,250 11/10/97

11/19/97

4,052

100

302 00 0095 / 5777

1100 S MICHIGAN AVE

3.0

2,250 05/30/00

05/30/00

1,517

100

302 00 0092 / 5774

1402 S MICHIGAN AVE

1.0

0 10/31/01

10/31/01

236

100

302 00 0092 / 5774

1416 S MICHIGAN AVE

1.0

0 10/31/01

10/31/01

236

100

302 00 0092 / 5774

1456 S MICHIGAN AVE

1.0

0 10/31/01

10/31/01

236

100

302 00 0092 / 5774

1504-1522 S MICHIGAN AVE

3.0

0 10/31/01

10/31/01

707

100

302 00 0092 / 5774

2740 S MICHIGAN AVE

1.0

0 02/07/01

02/07/01

236

100

300 06 0078 / 5241

1200 S STATE ST

21,675 11/06/02

11/14/02

21,661

100

302 00 0095 / 5777

819 S WABASH AVE

3.0

2,250 11/10/97

11/19/97

4,052

100

302 00 0092 / 5774

1235 S WABASH AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1243 S WABASH AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1259 S WABASH AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1301 S WABASH AVE

1.0

0 11/28/01

11/28/01

236

100

302 00 0092 / 5774

1423 S WABASH AVE

1.0

0 10/31/01

10/31/01

236

100

302 00 0092 / 5774

1439 S WABASH AVE

1.0

0 10/31/01

10/31/01

236

100

28.0

11/06/02

11/14/02

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 19

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0380 / 6566

2102 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0381 / 6567

2134 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

302 00 0095 / 5777

402 S WELLS ST

1.0

750 10/23/02

10/29/02

400

100

302 00 0095 / 5777

405 S WELLS ST

6.0

4,500 11/17/97

11/17/97

5,892

100

302 00 0095 / 5777

408 S WELLS ST

1.0

750 10/23/02

10/29/02

400

100

302 00 0095 / 5777

420 S WELLS ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0092 / 5774

1330 W FILLMORE ST

1.0

0 09/19/01

09/19/01

236

100

302 00 0092 / 5774

1359 W FILLMORE ST

1.0

0 09/19/01

09/19/01

236

100

302 00 0092 / 5774

1421 W FILLMORE ST

1.0

0 09/19/01

09/19/01

236

100

302 00 0092 / 5774

1439-1447 W FILLMORE ST

2.0

0 10/01/01

10/01/01

471

100

805 06 1978 / 8164

1000 W MONROE ST

1.0

09/13/96

09/13/96

0 09/13/96

09/13/96

300

100

805 06 1979 / 8165

1020 W MONROE ST

1.0

09/13/96

09/13/96

0 09/13/96

09/13/96

300

100

805 06 0425 / 6611

1401 W TAYLOR ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0426 / 6612

1431 W TAYLOR ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

302 00 0092 / 5774

2060 W WASHINGTON BLVD

1.0

0 02/27/01

02/27/01

236

100

302 00 0092 / 5774

2160 W WASHINGTON BLVD

1.0

0 02/27/01

02/27/01

236

100

805 06 0500 / 6686

2704 W WASHINGTON BLVD

1.0

10/23/96

10/23/96

0 10/23/96

10/23/96

300

100

805 06 0382 / 6568

2936 W WASHINGTON BLVD

1.0

04/21/95

04/21/95

0 04/21/95

04/21/95

300

100

302 00 0092 / 5774

2010 W WASHINGTON ST

1.0

0 01/17/01

01/17/01

236

100

302 00 0092 / 5774

2118 W WASHINGTON ST

1.0

0 02/27/01

02/27/01

236

100

302 00 0092 / 5774

2134 W WASHINGTON ST

1.0

0 02/27/01

02/27/01

236

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

1234 S MICHIGAN AVE

149.0

76,425

93,445

Lamps 5,217.0

06/01/07

12/31/07

153,588 09/01/07

09/15/07

0

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 20

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 06 0198 / 5323

ABLA HOMES (CHA)

03/04/01

03/24/01

92,650 03/14/01

03/24/01

80,334

100

300 06 0198 / 5323

HARRISON COURTS

02/24/01

05/24/01

12,506 05/31/01

05/31/01

6,400

100

300 06 0198 / 5323

LOOMIS COURTS

03/05/01

03/30/01

46,258 03/26/01

03/29/01

28,420

100

300 06 0198 / 5323

ROCKWELL GARDENS

02/20/01

03/08/01

71,050 03/01/01

03/13/01

52,194

100

300 07 0042 / 5465

ON W MADISON ST FROM WACKER DR TO CANAL ST

01/10/07

01/31/07

500

100

300 06 0167 / 5306

W JACKSON BLVD AND S FRANCISCO AVE

302 00 0092 / 5774

1.0

500

1.50

0 12/08/99

12/08/99

527

100

1020 S CLINTON ST

1.0

0 05/11/01

05/11/01

471

100

302 00 0092 / 5774

558 W DE KOVEN ST

1.0

0 05/11/01

05/11/01

471

100

302 00 0092 / 5774

560 W DE KOVEN ST

1.0

0 05/11/01

05/11/01

471

100

302 00 0092 / 5774

521 W TAYLOR ST

1.0

0 05/11/01

05/11/01

471

100

302 00 0092 / 5774

529 W TAYLOR ST

1.0

0 05/11/01

05/11/01

471

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

7.50

222,964

170,730

Blocks

302 00 0094 / 5776

ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE

565,355

100

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

150 06 / 32900

1065-1400 W ROOSEVELT RD

.0

08/21/07

12/30/10

0

35

Totals per Lighting Imprvmnts

3.0

3.0

0 03/08/98

998,725 10/15/07 998,725

08/01/99

565,355

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 21

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts

Installations .0

05/01/05

12/31/05

1,100,000 03/25/05

10/17/06

736,191

100

1.0

08/01/05

12/31/06

150,000 08/01/05

12/31/06

91,855

100

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

300 06 0278 / 5386

1400 S BLUE ISLAND AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

607 S JEFFERSON ST

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

not issued Note Last Updated on 01-NOV-07 607 Jefferson was constructed by private contractor. Job cannot be marked complete until material loaned to contractor by BOE is returned to BOE inventory. Note Last Updated on 17-JAN-07 12/31/05 0 03/01/05 12/31/05 0 .0 03/01/05 1240 S LEAVITT ST

0

300 06 0292 / 5399

610 S MICHIGAN AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

Still open for construction Note Last Updated on 01-NOV-07 1620 S MICHIGAN AVE

.0

03/01/05

12/31/05

10,217 09/05/05

10/05/05

9,309

100

300 06 0292 / 5399

409 S MORGAN ST

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

Not construction job Note Last Updated on 01-NOV-07 225 S SANGAMON ST

.0

03/01/05

12/31/05

7,008 10/12/05

10/18/05

7,790

100

300 06 0292 / 5399

1255 S STATE ST

.0

03/01/05

12/31/05

9,473 01/03/06

03/18/06

3,262

100

300 06 0282 / 5390

550 W ADAMS ST

.0

10/06/04

10/31/07

0 10/06/04

03/11/05

12,996

100

300 06 0292 / 5399

550 W ADAMS ST

1.0

02/17/05

03/15/06

143,600 02/17/05

03/15/06

141,332

100

281 00 / 33670

Project has been completed.(100%) Note Last Updated on 01-SEP-06 1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

300 06 0292 / 5399

520 W ROOSEVELT RD

1.0

03/01/05

12/31/05

0 07/05/05

09/09/05

610

100

300 06 0300 / 5407

ABLA HOMES (CHA)

300 06 0289 / 5396

ROCKWELL GARDENS

281 00 / 33670

Totals per Lighting Imprvmnts

Work Type: Loop Lighting

3.0

1,420,298

1,003,345

Blocks

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Loop Lighting

.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 22

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 09 / 33068

ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE

2.0

01/28/09

02/02/09

2,700 01/28/09

02/02/09

2,000

100

300 09 / 33068

ON E 14TH PL FROM S STATE ST TO S WABASH AVE

1.0

01/28/09

02/02/09

1,350 01/28/09

02/02/09

1,000

100

300 09 / 33068

ON E 14TH ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

01/28/09

02/02/09

1,350 01/28/09

02/02/09

1,000

100

300 07 0002 / 5425

ON E 18TH ST FROM S PRAIRIE AVE TO S CALUMET AVE

1.0

11/01/06

12/01/06

225,951 11/02/06

05/07/07

0

100

300 09 / 33068

ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

08/25/08

09/05/08

1,350 07/18/08

09/02/08

1,350

100

300 09 / 33068

MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

08/25/08

09/05/08

1,350 08/20/08

09/02/08

1,350

100

300 09 / 33068

MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

10.88

11/24/08

12/05/08

14,688 11/24/08

12/05/08

12,462

100

300 09 / 33068

ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

13.76

12/15/08

12/31/08

18,576 12/01/08

12/09/08

15,760

100

300 09 / 33068

ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD

13.0

01/19/09

01/23/09

17,550 01/19/09

01/23/09

13,167

100

300 09 / 33068

ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST

4.0

07/28/08

08/14/08

5,400 07/28/08

08/14/08

4,580

100

300 09 / 33068

ON S CLINTON ST FROM W HARRISON ST TO W VAN BUREN ST

7.0

10/15/08

10/21/08

9,450 10/15/08

10/21/08

8,213

100

300 09 / 33068

ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST

11.0

03/28/08

04/04/08

22,000 03/28/08

04/04/08

12,452

100

300 09 / 33068

ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST

11.0

12/17/08

01/23/09

14,850 12/17/08

01/23/09

6,253

100

300 09 / 33068

ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST

8.0

03/28/08

04/04/08

16,000 03/28/08

04/04/08

9,160

100

300 09 / 33068

ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST

10.0

12/03/08

12/09/08

13,500 12/03/08

12/09/08

11,505

100

300 09 / 33068

ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD

11.0

01/12/09

01/30/09

14,850 01/14/09

01/22/09

21,786

100

300 09 / 33068

ON S WABASH AVE FROM E 23RD ST TO E 24TH PL

5.0

08/25/08

09/05/08

6,750 08/25/08

09/05/08

5,725

100

300 09 / 33068

ON S WABASH AVE FROM E 29TH ST TO E 30TH ST

5.0

08/25/08

09/05/08

6,750 07/10/08

07/15/08

5,725

100

300 09 / 33068

MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST

3.0

07/28/08

08/15/08

4,050 07/28/08

08/15/08

3,425

100

300 09 / 33068

ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY

24.0

01/05/09

02/02/09

32,400 01/05/09

02/02/09

21,167

100

300 09 / 33068

ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD

4.50

07/28/08

08/08/08

9,000 07/28/08

08/08/08

5,153

100

300 09 / 33068

ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE

13.0

12/18/08

01/08/09

17,550 12/18/08

01/08/09

12,593

100

300 09 / 33068

ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST

12.0

01/08/09

02/20/09

16,200 01/08/09

02/20/09

15,919

100

300 09 / 33068

ON W HARRISON ST FROM S OAKLEY BLVD TO S MAPLEWOOD AVE

32.0

10/06/08

10/30/08

43,200 09/18/08

09/30/08

36,640

100

300 09 / 33068

ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST

7.0

08/25/08

08/29/08

9,450 08/25/08

08/29/08

8,015

100

300 09 / 33068

ON W POLK ST FROM S DEARBORN ST TO S CLARK ST

2.0

03/28/08

04/04/08

2,700 03/28/08

04/04/08

2,290

100

300 09 / 33068

ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE

2.0

10/20/08

10/24/08

2,700 10/09/08

10/16/08

2,864

100

300 09 / 33091

ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST

4.0

02/01/08

12/31/08

5,400 10/06/08

10/16/08

4,620

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 23

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 09 / 33068

ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE

6.0

07/30/08

08/15/08

8,100 07/30/08

08/15/08

6,870

100

300 09 / 33068

1400-1500 S LOOMIS ST

6.0

08/04/08

08/08/08

8,700 08/07/08

08/12/08

6,870

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting

232.14

553,865

259,913

Blocks

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Ornamental Lighting

Work Type: POD Camera Pole

.0

Poles

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

0

0

0

0

0

Totals per POD Camera Pole

Work Type: Residential Regrouping 300 06 0270 / 5378

429 S DEARBORN ST

Work Type: Residntl Staggered Lighting

.0

Lamps .0

03/01/08

12/01/08

Blocks

300 07 0002 / 5425

ON S CLAREMONT AVE FROM W FLOURNOY ST TO W POLK ST

1.0

04/18/06

11/18/06

65,000 11/21/06

04/13/07

43,295

100

300 07 0002 / 5425

ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST

1.0

04/18/06

11/18/06

80,000 09/01/06

10/27/06

51,733

100

300 09 / 33069

ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST

1.48

96,200 04/01/08

12/01/08

0

0

300 06 0298 / 5405

ON S PRAIRIE AVE FROM E 35TH ST TO E 37TH ST

2.0

0 10/06/05

12/20/05

148,781

100

300 05 0002 / 5117

ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST

1.0

10/01/05

11/18/05

85,250 10/31/05

03/22/06

41,060

100

300 06 0308 / 5414

ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD

2.0

06/06/06

08/09/06

149,100 05/31/06

07/31/06

115,344

100

300 09 / 33068

Project has been completed as 07/31/2006 Note Last Updated on 25-AUG-06 ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE

1.0

0

0

300 06 0308 / 5414

ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE

1.0

07/31/06

09/22/06

70,814 07/25/06

03/23/07

40,204

100

300 05 0002 / 5117

ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST

2.0

10/01/05

11/18/05

170,000 11/18/05

03/22/06

134,342

100

300 07 0002 / 5425

ON W WILCOX ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD

2.0

04/18/06

11/18/06

150,000 09/01/06

10/27/06

103,465

100

Totals per Residntl Staggered Lighting

14.48

18,000

884,364

678,224

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 24

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 03 0002 / 4873

ON S GILES AVE FROM E 31ST ST TO E 35TH ST

1.76

09/15/04

11/15/04

281,600 09/09/04

12/31/04

162,916

100

300 06 0235 / 5349

ON W ADAMS ST FROM S WESTERN AVE TO S LEAVITT ST

2.0

09/15/03

12/15/03

167,970 09/05/03

11/04/03

137,598

100

300 06 0267 / 5375

ON W MONROE ST FROM S WESTERN AVE TO S LEAVITT ST

2.0

10/01/04

12/30/04

147,450 10/09/04

12/10/04

121,950

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial

5.76

597,020

422,464

Locations

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Short Arm Installs - Arterial

Work Type: Short Arm Installs - Residntl 281 00 / 33670

W POLK ST AND S STATE ST

302 00 0092 / 5774

2332 W FLOURNOY ST

281 00 / 33670

1611 W HARRISON ST

Totals per Short Arm Installs - Residntl

.0

Locations .0

01/01/08

12/31/08

2.0 .0 2.0

0

0

0

756

100

0

0

0

0

756

0 06/14/01 01/01/08

12/31/08

06/14/01

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 25

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 09 / 33068

ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE

3.0

09/17/08

09/19/08

900 09/17/08

09/19/08

630

100

300 09 / 33068

ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE

3.0

05/27/08

06/13/08

900 07/09/08

07/10/08

630

100

300 06 0081 / 5244

ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE

5.92

0 05/23/98

05/23/98

376

100

300 09 / 33068

ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

06/09/08

06/13/08

300 07/18/08

09/02/08

630

100

300 09 / 33068

ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE

1.0

08/18/08

08/20/08

300 08/18/08

08/20/08

210

100

300 09 / 33068

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

7.48

05/28/08

06/20/08

1,870 06/06/07

06/10/08

1,571

100

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

8.60

05/28/08

06/20/08

2,150 06/13/07

06/24/08

1,806

100

302 00 0077 / 5765

ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR

0 08/25/99

08/31/99

1,529

100

300 09 / 33068

ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE

2,700 07/15/08

07/22/08

1,890

100

300 06 0081 / 5244

ON E JACKSON BLVD FROM S STATE ST TO S MICHIGAN AVE

27.0

0 05/02/98

05/03/98

1,715

100

300 06 0081 / 5244

ON E VAN BUREN ST FROM S STATE ST TO S MICHIGAN AVE

27.0

0 05/02/98

05/03/98

1,715

100

300 11 / 32191

ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST

300 11 / 32191

ON N FRANCISCO AVE FROM W MADISON ST TO W LAKE ST

300 11 / 32191

17.50 9.0

05/29/08

06/20/08

13.43

11/14/08

12/15/08

3,358 11/14/08

12/15/08

2,686

100

3.0

11/14/08

12/15/08

600 11/14/08

12/15/08

600

100

ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD

18.0

11/14/08

12/15/08

4,500 11/14/08

12/15/08

3,600

100

300 09 / 33068

ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST

22.0

06/02/08

06/13/08

4,400 06/02/08

06/13/08

4,620

100

300 11 / 32191

ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST

34.40

11/14/08

12/16/08

8,600 11/14/08

12/16/08

6,880

100

300 09 / 33068

ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST

9.0

05/29/08

06/20/08

2,700 05/29/08

06/20/08

1,890

100

300 09 / 33068

ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD

3.0

08/21/08

08/29/08

900 08/21/08

08/29/08

630

100

300 09 / 33068

ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST

4.0

06/02/08

06/13/08

1,200 06/02/08

06/13/08

840

100

300 06 0081 / 5244

ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST

0 05/17/98

05/23/98

2,350

100

300 09 / 33068

ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST

300 09 / 33068

ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE

300 09 / 33068

ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST

300 09 / 33068

37.0 7.0

10/13/08

10/17/08

2,100 10/13/08

10/17/08

1,470

100

17.20

06/02/08

06/20/08

3,440 06/02/08

06/13/08

3,612

100

19.0

07/16/08

07/31/08

3,800 07/16/08

07/31/08

3,990

100

ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST

4.0

06/02/08

06/30/08

1,200 06/02/08

06/26/08

840

100

300 09 / 33068

ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST

11.0

09/09/08

09/24/08

3,300 09/09/08

09/24/08

2,310

100

300 11 / 32191

ON S FRANCISCO AVE FROM W MADISON ST TO W MONROE ST

2.0

11/14/08

12/16/08

500 11/14/08

12/16/08

400

100

300 09 / 33068

ON S HAMILTON AVE FROM W ADAMS ST TO W JACKSON BLVD

2.0

04/01/08

04/21/08

400 04/01/08

04/21/08

420

100

300 09 / 33068

ON S HOYNE AVE FROM W ADAMS ST TO W GLADYS AVE

4.0

04/01/08

04/21/08

800 04/01/08

04/21/08

840

100

300 09 / 33068

ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST

7.38

05/29/08

06/20/08

1,845 05/29/08

06/20/08

1,550

100

300 06 0225 / 5340

ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD

94.0

09/01/03

09/07/03

40,030 08/28/03

09/05/03

28,910

100

300 09 / 33068

ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST

10.0

11/24/08

11/25/08

3,000 11/24/08

11/25/08

2,100

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 26

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0081 / 5244

ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST

300 09 / 33068

ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST

300 09 / 33068

Locations 23.50

0 05/13/98

05/16/98

1,493

100

4.41

06/02/08

06/13/08

1,323 06/02/08

06/13/08

926

100

ON S LEAVITT ST FROM W ADAMS ST TO W JACKSON BLVD

3.0

06/02/08

06/20/08

900 06/02/08

06/20/08

630

100

300 09 / 33068

ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST

4.0

06/02/08

06/20/08

800 06/02/08

06/20/08

840

100

300 09 / 33068

ON S LEAVITT ST FROM W MADISON ST TO W MONROE ST

5.0

04/01/08

04/23/08

1,000 04/01/08

04/23/08

1,050

100

300 09 / 33068

ON S LEAVITT ST FROM W VAN BUREN ST TO W CONGRESS PKWY

6.0

10/29/08

11/06/08

1,800 10/29/08

11/06/08

1,260

100

300 09 / 33068

ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST

16.0

06/02/08

06/20/08

4,800 06/02/08

06/20/08

3,360

100

300 09 / 33068

ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD

11.0

01/05/09

01/09/09

3,300 01/05/09

01/09/09

2,310

100

300 09 / 33068

ON S MAPLEWOOD AVE FROM W CONGRESS PKWY TO W HARRISON ST

4.0

04/01/08

04/22/08

1,200 04/01/08

04/22/08

840

100

300 09 / 33068

ON S MORGAN ST FROM W CONGRESS PKWY TO W VAN BUREN ST

2.0

11/12/08

11/17/08

600 11/12/08

11/17/08

420

100

300 09 / 33068

ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST

4.0

06/02/08

06/20/08

1,200 06/02/08

06/20/08

840

100

300 11 / 32191

ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST

10.44

11/14/08

12/16/08

2,610 11/14/08

12/16/08

2,088

100

300 09 / 33068

ON S PAULINA ST FROM W VAN BUREN ST TO W CONGRESS PKWY

4.0

09/16/08

09/19/08

1,200 09/16/08

09/19/08

840

100

300 06 0108 / 5263

ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST

6.0

08/10/04

08/11/04

1,500 07/23/04

07/28/04

1,476

100

300 11 / 32191

ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST

17.20

11/14/08

12/16/08

4,300 11/14/08

12/16/08

3,440

100

300 06 0081 / 5244

ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY

4.0

0 05/23/98

05/23/98

254

100

300 09 / 33068

ON S WABASH AVE FROM E 23RD ST TO E 24TH PL

5.0

06/09/08

06/13/08

1,500 06/09/08

06/13/08

1,050

100

300 09 / 33068

ON S WABASH AVE FROM E 29TH ST TO E 30TH ST

5.0

06/09/08

06/13/08

1,500 06/09/08

06/13/08

1,050

100

300 06 0081 / 5244

ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE

74.10

0 05/08/98

05/17/98

4,769

100

300 06 0081 / 5244

ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY

3.20

0 05/23/98

05/23/98

203

100

300 09 / 33068

ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST

300 09 / 33068

ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST

300 09 / 33068

3.0

06/09/08

06/13/08

900 06/03/08

06/13/08

630

100

68.40

06/02/08

06/20/08

13,680 06/05/08

07/09/08

14,364

100

ON W ADAMS ST FROM S LEAVITT ST TO S DAMEN AVE

15.0

06/02/08

06/13/08

4,500 06/02/08

06/13/08

3,150

100

300 09 / 33068

ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE

13.0

10/07/08

10/22/08

3,900 10/07/08

10/22/08

2,730

100

300 09 / 33068

ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD

18.24

06/02/08

06/20/08

5,472 06/02/08

06/26/08

3,830

100

300 06 0081 / 5244

ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST

0 04/25/98

05/03/98

3,175

100

300 09 / 33068

ON W ADAMS ST FROM S WESTERN AVE TO S CAMPBELL AVE

300 09 / 33068

50.0 6.0

04/01/08

04/25/08

1,800 04/01/08

04/25/08

1,260

100

9.75

10/07/08

10/22/08

2,925 10/07/08

10/22/08

2,048

100

300 09 / 33068

ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD AVE ON W CONGRESS PKWY FROM S MAPLEWOOD AVE TO S LEAVITT ST

20.0

04/01/08

04/21/08

6,000 04/01/08

04/21/08

4,200

100

300 11 / 32191

ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST

19.0

11/14/08

12/15/08

4,750 11/14/08

12/15/08

3,800

100

300 09 / 33068

ON W GLADYS AVE FROM S WASHTENAW AVE TO S CALIFORNIA AVE

7.0

11/17/08

12/01/08

1,400 11/17/08

12/01/08

1,470

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 27

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 07 0002 / 5425

ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD

300 09 / 33068

ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD

22.0

04/18/06

11/18/06

5,500 10/20/06

10/21/06

0

100

31.20

08/13/08

09/09/08

9,360 08/13/08

09/09/08

6,552

300 11 / 32191

100

ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST

17.0

11/14/08

12/15/08

3,400 11/14/08

12/15/08

3,400

100

300 09 / 33068

ON W JACKSON BLVD FROM S DAMEN AVE TO S LEAVITT ST

13.0

11/06/08

12/01/08

3,900 11/06/08

12/01/08

2,730

100

300 09 / 33068

ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE

15.0

06/02/08

06/20/08

4,500 06/02/08

06/20/08

3,150

100

300 11 / 32191

ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE

29.64

11/14/08

12/15/08

7,410 11/14/08

12/15/08

5,928

100

300 06 0081 / 5244

ON W JACKSON BLVD FROM S STATE ST TO S JEFFERSON ST

107.0

0 04/25/98

05/03/98

6,795

100

300 09 / 33068

ON W LAKE ST FROM N SACRAMENTO BLVD TO N ALBANY AVE

300 09 / 33068

ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD

300 06 0081 / 5244

ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST

300 07 0042 / 5465

ON W MADISON ST FROM WACKER DR TO CANAL ST

300 09 / 33068

ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE

300 09 / 33068

ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST

300 06 0081 / 5244

ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST

300 09 / 33068

ON W OGDEN AVE FROM W VAN BUREN ST TO W CONGRESS PKWY

300 11 / 32191

6.0

10/09/08

10/17/08

1,800 10/09/08

10/17/08

1,260

100

73.0

02/01/08

04/11/08

21,900 02/01/08

04/11/08

15,330

100

0 05/04/98

05/10/98

2,826

100

44.50 2.0

04/18/06

11/18/06

500 08/14/06

09/01/06

395

100

20.0

06/02/08

06/20/08

6,000 06/02/08

06/20/08

4,200

100

7.0

07/01/08

07/07/08

2,100 07/01/08

07/10/08

1,470

100

0 05/04/98

05/10/98

2,858

100

45.0 4.0

09/17/08

09/23/08

1,200 09/17/08

09/23/08

840

100

ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE

31.92

11/14/08

12/16/08

7,980 11/14/08

12/16/08

6,384

100

300 06 0081 / 5244

ON W VAN BUREN ST FROM S STATE ST TO S JEFFERSON ST

106.0

0 04/25/98

05/03/98

6,731

100

300 09 / 33068

ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE

20.0

06/02/08

06/20/08

6,000 06/18/08

06/30/08

4,200

100

300 11 / 32191

ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE

47.0

11/14/08

12/15/08

11,750 11/14/08

12/15/08

9,400

100

300 11 / 32191

ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE

51.0

11/14/08

12/16/08

12,750 11/14/08

12/16/08

10,200

100

300 09 / 33068

ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE

22.0

06/02/08

06/20/08

6,600 06/24/08

07/01/08

4,620

100

300 09 / 33068

ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

12.0

06/02/08

06/20/08

3,600 06/26/08

07/07/08

2,520

100

300 09 / 33068

1400-1500 S LOOMIS ST

6.0

06/25/07

06/27/08

1,800 06/25/08

06/27/08

1,260

100

300 06 0081 / 5244

500 S STATE ST

4.0

0 05/23/98

05/23/98

254

100

300 06 0191 / 5316

300-400 W ROOSEVELT RD

21,000 10/30/00

11/15/00

21,000

100

Totals per Strt Light Pole Painting

60.0 1,669.41

11/01/00

11/20/00

309,703

277,337

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 28

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc

Blocks

281 00 / 33670

W POLK ST AND S STATE ST

.0

01/01/08

12/31/08

0

0

281 00 / 33670

1611 W HARRISON ST

.0

01/01/08

12/31/08

0

0

0

300 06 0191 / 5316

300-400 W ROOSEVELT RD

1.0

01/01/01

05/01/01

0

100

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Strt Lighting

1.0

142,200 01/10/01 142,200

0

Blocks

300 06 0074 / 5237

500-12000 S HOLDEN CT

03/01/98

04/15/00

145,000 03/03/98

300 06 0233 / 5347

11 S WACKER DR

12/31/02

12/31/04

220,000 10/22/02

Totals per Strt Lighting

03/19/01

0

365,000

03/30/00

137,485

100

26,157

40

163,642

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 29

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0251 / 5361

ON S CLINTON ST FROM W HARRISON ST TO W POLK ST

8.0

08/15/05

08/20/05

7,892 08/11/05

09/19/05

6,808

100

300 06 0251 / 5361

ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST

8.0

08/15/05

08/20/05

7,892 08/11/05

09/19/05

6,808

100

300 06 0251 / 5361

ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST

8.0

08/15/05

08/20/05

7,892 08/01/05

09/14/05

6,796

100

300 06 0251 / 5361

ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST

8.0

08/15/05

08/20/05

7,892 08/01/05

09/14/05

6,796

100

805 06 2741 / 8927

1015 N MICHIGAN AVE

52.0

01/01/93

01/01/93

0 01/01/93

01/01/93

39,000

100

805 06 2708 / 8894

1501 S ASHLAND AVE

22.0

06/05/94

06/05/94

0 06/05/94

06/05/94

16,500

100

805 06 2706 / 8892

1595 S ASHLAND AVE

30.0

06/06/94

06/06/94

0 06/06/94

06/06/94

22,500

100

302 00 0070 / 5758

1520 S BLUE ISLAND AVE

0 05/14/97

05/21/97

14,742

100

302 00 0070 / 5758

1550 S BLUE ISLAND AVE

0 05/14/97

05/21/97

24,170

100

805 06 2312 / 8498

498 S CANAL ST

13.0

05/18/94

05/18/94

0 05/18/94

05/18/94

9,750

100

805 06 2695 / 8881

1515 S CANAL ST

6.0

04/21/94

04/21/94

0 04/21/94

04/21/94

4,500

100

805 06 2694 / 8880

1595 S CANAL ST

6.0

04/22/94

04/22/94

0 04/22/94

04/22/94

4,500

100

805 06 2839 / 9025

1598 S CLARK ST

3.0

12/09/93

12/09/93

0 12/09/93

12/09/93

2,250

100

302 00 0070 / 5758

1500 S DAMEN AVE

0 10/05/97

10/20/97

22,318

100

805 06 2139 / 8325

1500 S DAMEN AVE

0 10/20/97

10/20/97

36,750

100

302 00 0070 / 5758

510 S DESPLAINES ST

0 07/08/97

07/15/97

13,318

100

805 06 2140 / 8326

510 S DESPLAINES ST

21.0

07/15/97

07/15/97

0 07/15/97

07/15/97

15,750

100

805 06 2596 / 8782

2430 S DR MARTIN LUTHER KING JR DR

30.0

06/25/95

06/25/95

0 06/25/95

06/25/95

22,500

100

805 06 2597 / 8783

2490 S DR MARTIN LUTHER KING JR DR

30.0

06/25/95

06/25/95

0 06/25/95

06/25/95

22,500

100

805 06 2593 / 8779

599 S FRANKLIN ST

12.0

02/24/94

02/24/94

0 02/24/94

02/24/94

9,000

100

805 06 2598 / 8784

1595 S INDIANA AVE

8.0

05/03/93

05/03/93

0 05/03/93

05/03/93

6,000

100

302 00 0070 / 5758

500 S JEFFERSON ST

0 07/24/97

07/31/97

16,090

100

805 06 2118 / 8304

500 S JEFFERSON ST

16.0

07/31/97

07/31/97

0 07/31/97

07/31/97

12,000

100

805 06 2890 / 9076

1501 S LAFLIN ST

14.0

02/11/94

02/11/94

0 02/11/94

02/11/94

10,500

100

805 06 2856 / 9042

1595 S LAFLIN ST

40.0

02/11/94

02/11/94

0 02/11/94

02/11/94

30,000

100

302 00 0071 / 5759

2300 S LAKE SHORE DR

0 06/05/98

06/19/98

23,274

100

805 06 2664 / 8850

2300 S LAKE SHORE DR

25.0

12/14/94

12/14/94

0 12/14/94

12/14/94

18,750

100

805 06 2665 / 8851

2300 S LAKE SHORE DR

25.0

12/31/94

12/31/94

0 12/31/94

12/31/94

18,750

100

805 06 2689 / 8875

2300 S LAKE SHORE DR

25.0

12/14/94

12/14/94

0 12/14/94

12/14/94

18,750

100

805 06 2901 / 9087

1501 S LOOMIS ST

20.0

12/07/93

12/07/93

0 12/07/93

12/07/93

15,000

100

805 06 2886 / 9072

1595 S LOOMIS ST

30.0

12/19/93

12/19/93

0 12/19/93

12/19/93

22,500

100

49.0

10/20/97

10/20/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 30

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2614 / 8800

1595 S MICHIGAN AVE

14.0

12/11/93

12/11/93

0 12/11/93

12/11/93

10,500

100

805 06 2583 / 8769

1505 S PAULINA ST

22.0

06/09/95

06/09/95

0 06/09/95

06/09/95

16,500

100

805 06 2582 / 8768

1595 S PAULINA ST

26.0

06/09/95

06/09/95

0 06/09/95

06/09/95

19,500

100

302 00 0070 / 5758

1530 S THROOP ST

0 05/20/97

06/03/97

13,193

100

805 06 2160 / 8346

1530 S THROOP ST

14.0

01/01/91

01/01/91

0 01/01/91

01/01/91

10,500

100

805 06 2161 / 8347

1530 S THROOP ST

18.0

06/03/97

06/03/97

0 06/03/97

06/03/97

13,500

100

805 06 2525 / 8711

1501 S WOOD ST

22.0

06/29/95

06/29/95

0 06/29/95

06/29/95

16,500

100

805 06 2707 / 8893

1598 W 16TH ST

6.0

05/24/94

05/24/94

0 05/24/94

05/24/94

4,500

100

805 06 2226 / 8412

130 W CONGRESS PKWY

64.0

12/09/96

12/09/96

0 12/09/96

12/09/96

48,000

100

805 06 2882 / 9068

930 W HARRISON ST

11.0

09/25/93

09/25/93

0 09/25/93

09/25/93

8,250

100

805 06 2933 / 9119

2545 W JACKSON BLVD

8.0

03/01/94

03/01/94

0 03/01/94

03/01/94

6,000

100

805 06 2936 / 9122

2600 W MADISON ST

8.0

03/02/94

03/02/94

0 03/02/94

03/02/94

6,000

100

805 06 2939 / 9125

2631 W MAYPOLE AVE

8.0

03/08/94

03/08/94

0 03/08/94

03/08/94

6,000

100

805 06 2776 / 8962

2545 W MONROE ST

6.0

12/23/94

12/23/94

0 12/23/94

12/23/94

4,500

100

805 06 2677 / 8863

101 W POLK ST

12.0

09/18/92

09/18/92

0 09/18/92

09/18/92

9,000

100

805 06 2775 / 8961

2579 W VAN BUREN ST

6.0

04/06/94

04/06/94

0 04/06/94

04/06/94

4,500

100

302 00 0070 / 5758

2600 W WARREN BLVD

0 09/08/97

09/15/97

7,403

100

805 06 2125 / 8311

2600 W WARREN BLVD

8.0

09/15/97

09/15/97

0 09/15/97

09/15/97

6,000

100

805 06 2209 / 8395

2631 W WARREN BLVD

6.0

12/31/95

12/31/95

0 12/31/95

12/31/95

4,500

100

302 00 0070 / 5758

2600 W WASHINGTON BLVD

0 11/20/97

12/02/97

14,078

100

805 06 2126 / 8312

2600 W WASHINGTON BLVD

8.0

12/02/97

12/02/97

0 12/02/97

12/02/97

6,000

100

805 06 2208 / 8394

2631 W WASHINGTON BLVD

6.0

12/31/95

12/31/95

0 12/31/95

12/31/95

4,500

100

Totals per Underpass Lighting

782.0

31,568

738,294

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 31

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

ON W ROOSEVELT RD FROM S RUBLE ST TO S DESPLAINES ST

1.0

0 04/29/02

04/29/02

9,181

100

210 06 0219 / 4459

N WESTERN AVE AND W LAKE ST

.50

03/24/05

03/25/05

5,282 03/01/05

03/01/05

4,365

100

210 06 0219 / 4459

N WESTERN AVE AND W WARREN BLVD

1.0

03/22/05

03/23/05

10,563 03/14/05

03/14/05

6,925

100

210 06 0219 / 4459

N WESTERN AVE AND W WASHINGTON BLVD

1.0

03/23/05

03/24/05

10,563 03/15/05

03/15/05

6,925

100

210 06 0130 / 4389

S CANAL ST AND W ROOSEVELT RD

1.0

0 04/23/02

04/23/02

6,410

100

210 06 0130 / 4389

S CLARK ST AND W JACKSON BLVD

.50

0 10/09/01

10/09/01

3,257

100

210 06 0219 / 4459

S CLARK ST AND W VAN BUREN ST

1.0

10,563 04/14/05

04/15/05

6,925

100

210 06 0130 / 4389

S COLUMBUS DR AND E BALBO AVE

.50

0 02/06/02

02/06/02

6,231

100

210 06 0130 / 4389

S COLUMBUS DR AND E CONGRESS DR

.50

0 03/06/02

03/06/02

4,728

100

210 06 0130 / 4389

S COLUMBUS DR AND E JACKSON BLVD

.50

0 01/17/02

01/17/02

4,856

100

210 06 0130 / 4389

S COLUMBUS DR AND E ROOSEVELT RD

1.0

0 02/20/02

02/20/02

11,457

100

210 06 0130 / 4389

S DEARBORN ST AND W JACKSON BLVD

.50

0 10/09/01

10/09/01

3,257

100

210 06 0219 / 4459

S DEARBORN ST AND W VAN BUREN ST

1.0

10,563 04/17/05

04/17/05

6,925

100

210 06 0130 / 4389

S FRANKLIN ST AND W ADAMS ST

1.0

0 10/02/01

10/02/01

6,108

100

210 06 0130 / 4389

S FRANKLIN ST AND W JACKSON BLVD

1.0

0 10/08/01

10/08/01

6,513

100

210 06 0130 / 4389

S FRANKLIN ST AND W MONROE ST

1.0

0 09/25/01

09/25/01

6,918

100

210 06 0130 / 4389

S FRANKLIN ST AND W VAN BUREN ST

1.0

0 10/23/01

10/23/01

6,513

100

210 06 0219 / 4459

S FRANKLIN ST AND W VAN BUREN ST

1.0

10,563 04/18/05

04/18/05

6,203

100

210 06 0130 / 4389

S INDIANA AVE AND E ROOSEVELT RD

1.0

0 02/26/02

02/26/02

7,729

100

210 06 0130 / 4389

S JEFFERSON ST AND W ROOSEVELT RD

1.0

0 04/26/02

04/26/02

8,539

100

210 06 0130 / 4389

S MICHIGAN AVE AND E 14TH ST

1.0

0 11/29/01

11/29/01

12,035

100

210 06 0130 / 4389

S MICHIGAN AVE AND E JACKSON BLVD

.50

0 11/04/02

11/04/02

5,132

100

210 06 0130 / 4389

S MICHIGAN AVE AND E VAN BUREN ST

1.0

0 11/04/02

11/04/02

8,518

100

210 06 0120 / 4379

S MORGAN ST AND W MONROE ST

1.0

12,700 03/21/01

03/26/01

672

100

210 06 0130 / 4389

S PAULINA ST AND W ROOSEVELT RD

1.0

0 01/09/02

01/09/02

6,410

100

210 06 0130 / 4389

S WABASH AVE AND E JACKSON BLVD

.50

0 10/09/01

10/09/01

2,395

100

210 06 0130 / 4389

S WABASH AVE AND E VAN BUREN ST

1.0

0 10/25/01

10/25/01

7,272

100

210 06 0130 / 4389

S WELLS ST AND W ADAMS ST

.50

0 10/04/01

10/04/01

3,459

100

210 06 0175 / 4423

S WELLS ST AND W CONGRESS PKWY

1.0

16,000 04/14/03

04/17/03

13,664

100

210 06 0130 / 4389

S WELLS ST AND W JACKSON BLVD

.50

0 10/10/01

10/10/01

2,940

100

210 06 0130 / 4389

S WELLS ST AND W MONROE ST

.50

0 10/04/01

10/04/01

3,662

100

04/19/05

04/22/05

04/23/05

04/01/01

04/14/03

04/19/05

04/22/05

04/23/05

06/01/01

04/17/03

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 32

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S WELLS ST AND W VAN BUREN ST

1.0

04/20/05

04/20/05

10,563 04/15/05

04/15/05

6,203

100

210 06 0219 / 4459

S WESTERN AVE AND W CONGRESS PKWY

1.0

03/18/05

03/19/05

10,563 03/21/05

03/21/05

6,800

100

210 06 0219 / 4459

S WESTERN AVE AND W HARRISON ST

1.0

03/17/05

03/18/05

10,563 03/22/05

03/22/05

8,008

100

210 06 0219 / 4459

S WESTERN AVE AND W JACKSON BLVD

1.0

03/20/05

03/21/05

10,563 03/23/05

03/23/05

8,007

100

210 06 0219 / 4459

S WESTERN AVE AND W VAN BUREN ST

1.0

03/19/05

03/20/05

10,563 03/30/05

03/30/05

6,800

100

210 06 0130 / 4389

S WOOD ST AND W ROOSEVELT RD

1.0

0 01/09/02

01/09/02

8,539

100

210 06 0175 / 4423

W VAN BUREN ST AND S CLARK ST

1.0

17,000 06/06/03

06/11/03

16,020

100

210 06 0130 / 4389

840 S CANAL ST

1.0

0 09/28/01

09/28/01

4,738

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0209 / 4452

S CANAL ST AND W ROOSEVELT RD

210 06 0231 / 4470

S RACINE AVE AND W ROOSEVELT RD

300 07 0002 / 5425 300 06 0078 / 5241

06/06/03

06/11/03

33.50

156,612

261,235

Locations 1.0

09/20/04

10/08/04

88,687

100

.0

03/01/08

12/01/08

109,720

0

0

W HARRISON ST AND S STATE ST

1.0

04/18/06

11/18/06

40,000

0

0

1600 W FLOURNOY ST

1.0

04/01/98

12/01/98

5,981

100

Totals per Left Turn Arrow

Work Type: New Signal

3.0

97,100 09/14/04

6,500 08/13/99

09/28/04

08/17/99

253,320

94,668

Locations

300 06 0283 / 5391

ON S ASHLAND AVE FROM W OGDEN AVE TO W MADISON ST

1.0

09/01/04

09/30/04

11,150 09/09/04

09/09/04

11,150

100

300 11 / 32191

E 13TH ST AND S MICHIGAN AVE

1.0

06/03/08

06/30/08

165,000 06/03/08

06/30/08

165,000

100

210 06 0073 / 4337

1500 S CLARK ST

1.0

05/15/01

12/01/01

175,000 05/16/01

07/23/01

84,034

100

3.0

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477

E VAN BUREN ST AND S MICHIGAN AVE

210 06 / 32280

S CANAL ST AND W JACKSON BLVD

210 06 0240 / 4477

S CLARK ST AND W CONGRESS PKWY

210 06 0207 / 4450

S MICHIGAN AVE AND E JACKSON BLVD

210 06 / 32280

W ADAMS ST AND S CANAL ST

Totals per Pedestrian Countdown Signal Install

351,150

260,184

Locations 6.0

05/01/06

09/30/06

.0

05/04/08

12/31/08

12.0

05/01/06

06/01/06

.50

12/01/04

12/15/04

.0

05/04/08

12/31/08

18.50

9,500 03/28/06

03/28/06

11,682

5,688

100

0

0

5,632 03/28/06

03/28/06

6,446

100

5,179 12/01/04

12/08/04

5,255

100

11,356

0

0

43,349

17,389

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 33

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals

Crossings

300 06 0197 / 5322

N CALIFORNIA AVE AND W LAKE ST

.50

2,000 07/18/01

04/08/02

1,285

100

300 06 0197 / 5322

N SACRAMENTO AVE AND W LAKE ST

2.0

8,000 07/18/01

07/19/01

1,780

100

300 06 0197 / 5322

S DAMEN AVE AND W 14TH ST

2.0

8,000 08/09/01

08/09/01

0

100

300 06 0197 / 5322

S RACINE AVE AND W CONGRESS PKWY

2.0

8,000 10/12/01

04/08/02

693

100

300 06 0197 / 5322

S SACRAMENTO AVE AND W FIFTH AVE

.50

2,000 07/18/01

07/19/01

1,948

100

300 06 0197 / 5322

S WABASH AVE AND E 24TH ST

1.0

4,000 04/18/01

04/19/01

2,445

100

300 06 0197 / 5322

W 14TH ST AND S BLUE ISLAND AVE

.50

2,000 09/11/01

09/12/01

1,328

100

300 06 0197 / 5322

W ROOSEVELT RD AND S LOOMIS ST

1.0

12,000 07/02/01

08/01/01

18,249

100

300 06 0197 / 5322

1758 W JACKSON BLVD

1.0

8,000 11/19/01

11/19/01

13,649

100

Totals per Removal Temp Wiring - Signals

Work Type: Signal Realignment 300 06 0199 / 5324 Totals per Traffic

W JACKSON BLVD AND S CANAL ST

04/18/01

04/19/01

10.50

54,000

41,376

Intersections 1.0

08/30/01

08/30/01

2,090 08/22/01 1,541,740

08/22/01

2,013 3,928,167

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 34

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install 210 06 0232 / 4471

ON W 14TH ST FROM S BLUE ISLAND AVE TO S RACINE AVE

210 06 0020 / 4295

S BLUE ISLAND AVE AND W 16TH ST

210 06 0021 / 4296

W WASHINGTON ST AND N HOYNE AVE

814 06 0351 / 16549

Locations 04/15/05

11/15/05

338,000 04/07/05

01/11/06

303,511

100

05/18/00

07/15/00

82,500 05/18/00

09/25/00

95,886

100

1.0

05/01/01

08/01/01

132,000 04/03/01

07/05/01

136,385

100

200 N CALIFORNIA AVE

1.0

09/26/96

09/26/96

0 09/26/96

09/26/96

117,950

100

814 06 0276 / 16488

844 N CLARK ST

1.0

05/22/89

05/22/89

0 05/22/89

05/22/89

59,113

100

814 06 0380 / 16570

100 N WESTERN AVE

1.0

04/25/97

04/25/97

0 04/25/97

09/22/97

200,000

100

814 06 0369 / 16559

700 S ASHLAND AVE

1.0

10/13/95

10/13/95

0 10/13/95

10/13/95

160,943

100

300 06 0117 / 5271

1200 S CLINTON ST

1.0

30,000 02/19/99

09/23/99

40,562

100

814 06 0308 / 16520

400 S DAMEN AVE

1.0

05/17/89

05/17/89

0 05/17/89

05/17/89

87,789

100

814 06 0337 / 16536

500 S DAMEN AVE

1.0

05/16/89

05/16/89

0 05/16/89

05/16/89

87,789

100

814 06 0309 / 16521

999 S DESPLAINES ST

1.0

07/26/90

07/26/90

0 07/26/90

07/26/90

95,000

100

814 06 0184 / 16396

2400 S DR MARTIN LUTHER KING JR DR

1.0

03/02/94

03/02/94

0 03/02/94

03/02/94

120,000

100

814 06 0183 / 16395

2500 S DR MARTIN LUTHER KING JR DR

1.0

02/24/94

02/24/94

0 02/24/94

02/24/94

120,000

100

814 06 0093 / 16309

2559 S DR MARTIN LUTHER KING JR DR

1.0

01/28/94

01/28/94

0 01/28/94

01/28/94

98,691

100

814 06 0091 / 16307

3100 S DR MARTIN LUTHER KING JR DR

1.0

02/07/94

02/07/94

0 02/07/94

02/07/94

98,691

100

814 06 0213 / 16425

2199 S INDIANA AVE

1.0

11/03/94

11/03/94

0 11/03/94

11/03/94

120,000

100

814 06 0211 / 16423

2400 S INDIANA AVE

1.0

10/25/94

10/25/94

0 10/25/94

10/25/94

120,000

100

814 06 0190 / 16402

200 S JEFFERSON ST

1.0

01/31/92

01/31/92

0 01/31/92

01/31/92

88,990

100

814 06 0212 / 16424

2200 S MICHIGAN AVE

1.0

10/28/94

10/28/94

0 10/28/94

10/28/94

120,000

100

814 06 0215 / 16427

2400 S MICHIGAN AVE

1.0

10/25/94

10/25/94

0 10/25/94

10/25/94

120,000

100

814 06 0386 / 16574

400 S MORGAN ST

1.0

10/31/95

10/31/95

0 10/31/95

10/31/95

104,565

100

814 06 0079 / 16295

1400 S STATE ST

1.0

04/07/96

04/07/96

0 04/07/96

04/07/96

118,870

100

814 06 0257 / 16469

400 S WESTERN AVE

1.0

08/16/89

08/16/89

0 08/16/89

08/16/89

74,970

100

814 06 0255 / 16467

500 S WESTERN AVE

1.0

08/18/89

08/18/89

0 08/18/89

08/18/89

74,970

100

814 06 0253 / 16465

800 S WESTERN AVE

1.0

09/22/89

09/22/89

0 09/22/89

09/22/89

74,970

100

814 06 0345 / 16543

405 W JACKSON BLVD

1.0

04/23/97

05/09/97

0 04/23/97

05/09/97

73,473

100

814 06 0186 / 16398

421 W JACKSON BLVD

1.0

04/23/97

04/23/97

0 04/23/97

05/09/97

200,000

100

814 06 0055 / 16272

713 W TAYLOR ST

1.0

09/29/89

09/29/89

0 09/29/89

09/29/89

90,000

100

Totals per TSM Install

2.0

28.0

582,500

3,203,118

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 35

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 09 / 33068

ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE

2.0

06/09/08

06/13/08

400 07/18/08

09/02/08

338

100

300 09 / 33068

ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE

2.0

06/09/08

06/13/08

400 08/18/08

08/20/08

300

100

300 09 / 33068

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

.68

05/28/08

06/20/08

136 04/01/08

12/01/08

85

100

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

.86

05/28/08

06/20/08

172 04/01/08

12/01/08

73

100

300 11 / 32191

ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST

11.06

11/14/08

12/15/08

3,784 11/14/08

12/15/08

3,561

100

300 11 / 32191

ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD

13.0

11/14/08

12/15/08

4,655 11/14/08

12/15/08

4,186

100

300 09 / 33068

ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST

5.0

06/02/08

06/13/08

1,391 04/01/08

12/01/08

0

100

300 11 / 32191

ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST

20.64

11/14/08

12/16/08

7,061 11/14/08

12/16/08

6,646

100

300 09 / 33068

ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST

5.0

04/01/08

12/01/08

700 04/01/08

12/01/08

0

0

300 09 / 33068

ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST

8.0

04/01/08

12/01/08

1,860 04/01/08

12/01/08

1,600

100

300 09 / 33068

ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST

3.0

06/02/08

06/20/08

878 04/01/08

12/01/08

0

100

300 09 / 33068

ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST

3.0

06/02/08

06/20/08

600 04/01/08

12/01/08

0

0

300 09 / 33068

ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD

1.0

01/05/09

01/09/09

200 01/05/09

01/09/09

85

100

300 09 / 33068

ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST

3.0

06/02/08

06/20/08

878 04/01/08

12/01/08

0

100

300 11 / 32191

ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST

32.19

11/14/08

12/16/08

12,180 11/14/08

12/16/08

10,365

100

300 11 / 32191

ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST

10.32

300 09 / 33068

ON S WABASH AVE FROM E 23RD ST TO E 24TH PL

300 09 / 33068

ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST

300 09 / 33068

ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE

300 09 / 33068

ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD

300 11 / 32191

ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST

300 07 0002 / 5425

ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD

300 09 / 33068

ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE

300 11 / 32191

ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE

300 09 / 33068

3,696

0

0

232

100

2.0

06/09/08

06/13/08

400 04/01/08

12/01/08

18.05

06/02/08

06/20/08

5,020 04/01/08

12/01/08

0

100

5.0

10/07/08

10/22/08

2,050 10/07/08

10/22/08

1,625

100

6.08

06/02/08

06/20/08

1,691 04/01/08

12/01/08

0

100

1.0

11/14/08

12/15/08

200 11/14/08

12/15/08

200

100

22.0

04/18/06

11/18/06

8,750 10/20/06

10/21/06

0

100

8.0

06/02/08

06/20/08

2,344 04/01/08

12/01/08

0

100

12.16

11/14/08

12/15/08

4,484 11/14/08

12/15/08

3,916

100

ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD

14.0

02/01/08

04/11/08

3,894 04/01/08

12/01/08

0

100

300 09 / 33068

ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE

6.0

06/02/08

06/20/08

1,669 04/01/08

12/01/08

0

100

300 09 / 33068

ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST

4.0

07/01/08

07/07/08

2,000 07/01/08

07/07/08

1,540

100

300 09 / 33068

ON W POLK ST FROM S DEARBORN ST TO S CLARK ST

3.0

04/01/08

12/01/08

780 04/01/08

12/01/08

450

100

300 11 / 32191

ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE

5.32

11/14/08

12/16/08

1,862 11/14/08

12/16/08

1,713

100

300 09 / 33068

ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE

7.0

06/02/08

06/20/08

1,947 04/01/08

12/01/08

0

100

300 11 / 32191

ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE

17.0

11/14/08

12/15/08

6,550 11/14/08

12/15/08

5,474

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 36

1/1/2008 AND 12/31/2008

Ward 02 Bob Fioretti CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 11 / 32191

ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE

18.0

11/14/08

12/16/08

6,750 11/14/08

12/16/08

5,796

0

300 09 / 33068

ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE

8.0

06/02/08

06/20/08

2,226 04/01/08

12/01/08

0

100

300 09 / 33068

ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

4.0

06/02/08

06/20/08

1,112 04/01/08

12/01/08

0

100

300 09 / 33068

S ASHLAND AVE AND W CONGRESS PKWY

1.0

3,200

0

0

300 09 / 33068

S RACINE AVE AND W VAN BUREN ST

1.0

2,800

0

0

283.36

98,719

48,185

Totals per Traffic Equipment Painting

Work Category: Transit Work Type: Two-way Conversion 210 06 0165 / 4416

ON S FINANCIAL PL FROM W JACKSON BLVD TO W VAN BUREN ST

Locations 1.0

10/15/02

12/02/02

20,000 10/07/02

10/11/02

3,618

Totals per Construction Phase

7,500,637

8,433,866

Totals for Ward 02

7,599,287

8,530,059

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 37

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0244 / 5354

ROBERT TAYLOR A (CHA)

.0

04/08/08

06/08/09

0

300 06 0244 / 5354

ROBERT TAYLOR B (CHA)

1.0

10/29/02

06/30/03

0 03/20/06

300 06 0243 / 5353

STATEWAY GARDENS

1.0

06/28/01

43,054

70

300 06 0313 / 5419

WENTWORTH GARDEN (CHA)

.0

04/17/06

09/29/06

70,000 04/17/06

09/30/06

35,000

100

300 06 0308 / 5414

ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST

300 06 0292 / 5399

1725 S CLARK ST

281 00 / 33670

4100 S MICHIGAN AVE

300 06 0282 / 5390

5546 S STATE ST

281 00 / 33670

1935 S WABASH AVE

300 06 0292 / 5399

5014 S WELLS ST

300 06 0292 / 5399

1512 W 47TH ST

1.0

Totals per Design/Engineering

04/04/06

0 06/28/01

0

0

14,346

100

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,721

100

1.0

02/15/05

03/04/05

1,000 11/05/04

03/18/05

789

100

.0

01/01/08

12/31/08

1.0

11/04/04

01/03/05

.0

01/01/08

12/31/08

1.0

02/15/05

02/22/05

03/01/05

03/30/05

6.0

0

0

0

01/03/05

800

100

0

0

800 01/04/05

04/05/05

609

100

2,000 03/08/05

05/17/05

1,539

100

800 11/19/04 0

74,600

98,858

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 38

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233

Fixtures 0 05/21/02

05/21/02

1,125

100

0 02/28/02

03/05/02

1,582

100

840 04/12/02

04/12/02

812

100

840 01/25/02

01/25/02

812

100

0 02/28/02

03/05/02

1,809

100

609 01/25/02

01/25/02

609

100

1,200 06/23/08

06/27/08

792

100

7.0

0 02/28/02

03/05/02

2,625

100

7.0

0 02/28/02

03/05/02

2,625

100

4.0

300 06 0069 / 5233

ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON E 44TH ST FROM S INDIANA AVE TO S VINCENNES AVE

300 06 0069 / 5233

ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

4.0

04/15/02

04/15/02

302 00 0092 / 5774

4.0

01/28/02

01/28/02

300 06 0069 / 5233

ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON E 45TH ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

302 00 0092 / 5774

ON E 45TH ST FROM S MICHIGAN AVE TO S INDIANA AVE

3.0

01/28/02

01/28/02

300 09 / 33069

ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE

3.0

06/23/08

06/27/08

300 06 0069 / 5233

Materials Ordered Note Last Updated on 12-JUN-08 ON E 46TH ST FROM S INDIANA AVE TO S CALUMET AVE

300 06 0069 / 5233

ON E 48TH ST FROM S WABASH AVE TO S VINCENNES AVE

300 09 / 33069

ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE

300 11 / 32192

7.0

8.0

2.75

06/25/08

06/27/08

1,100 06/25/08

06/26/08

756

100

Materials Ordered Note Last Updated on 12-JUN-08 ON S CALUMET AVE FROM E 42ND ST TO E 44TH ST

8.0

12/19/07

04/03/08

2,800 12/19/07

12/19/07

1,171

100

300 06 0069 / 5233

ON S CALUMET AVE FROM E 43RD ST TO E 48TH ST

25.0

0 02/28/02

03/05/02

5,653

100

300 11 / 32192

ON S CALUMET AVE FROM E 49TH ST TO E 53RD ST

12.0

12/19/07

04/03/08

4,200 12/19/07

12/19/07

1,756

100

300 11 / 32192

ON S DR MARTIN LUTHER KING JR DR FROM E 42ND ST TO E 44TH ST

8.0

12/19/07

04/04/08

2,800 12/19/07

12/19/07

1,171

100

300 06 0069 / 5233

ON S PRAIRIE AVE FROM E 43RD ST TO E 48TH ST

25.0

0 02/28/02

03/05/02

5,653

100

300 11 / 32192

ON S PRAIRIE AVE FROM E 47TH ST TO E 48TH ST

4.0

12/19/07

04/04/08

1,400 12/19/07

12/19/07

586

100

300 11 / 32192

ON S PRAIRIE AVE FROM E 51ST ST TO E 53RD ST

11.0

10/01/07

10/05/07

4,600 10/09/07

10/09/07

1,610

100

302 00 0092 / 5774

ON S VINCENNES AVE FROM E 47TH ST TO E 44TH ST

13.0

01/28/02

01/28/02

2,730 01/25/02

01/25/02

2,639

100

300 09 / 33069

ON S WELLS ST FROM W PERSHING RD TO W ROOT ST

3.0

07/21/08

07/22/08

1,200 06/25/08

06/27/08

849

100

300 06 0069 / 5233

Materials ordered Note Last Updated on 12-JUN-08 456 E 42ND ST

1.0

0 05/21/02

05/21/02

375

100

302 00 0092 / 5774

4501 S MARSHFIELD AVE

3.0

0 02/23/01

02/23/01

617

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

162.75

24,319

35,627

7,956,351

3,793,625

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 39

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 09 / 33068

ON E 14TH PL FROM S STATE ST TO S WABASH AVE

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

2.0

01/28/09

02/02/09

800 01/28/09

02/02/09

644

100

1.40

05/28/08

06/20/08

588 04/01/08

12/01/08

438

300 11 / 32192

100

ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST

139.0

12/01/07

01/01/08

56,600 09/25/07

10/24/07

39,708

100

300 05 0003 / 5118

ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST

30.0

07/01/06

08/01/06

300 09 / 33068

ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST

1.62

05/29/08

06/20/08

648 04/01/08

12/01/08

507

100

300 09 / 33069

ON S MICHIGAN AVE FROM E 42ND ST TO E 43RD ST

7.0

06/26/08

06/27/08

2,800 06/26/08

06/27/08

2,080

100

300 06 0225 / 5340

Materials Ordered Note Last Updated on 12-JUN-08 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST

06/05/03

06/13/03

5,000 06/05/03

06/13/03

9,026

100

300 09 / 33068

E 31ST ST AND S INDIANA AVE

7.0

06/02/08

06/20/08

2,800 06/02/08

06/06/08

2,191

100

300 09 / 33069

S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD

2.0

10/31/08

10/31/08

800 10/31/08

10/31/08

546

100

Totals per 400 Watt Changeout

190.02

4,400

74,436

0

55,140

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 40

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0069 / 5233

436 E 46TH ST

1.0

0 02/26/02

02/26/02

350

100

302 00 0092 / 5774

447 E BOWEN AVE

1.0

0 01/18/02

01/18/02

236

100

302 00 0092 / 5774

469 E BOWEN AVE

1.0

0 12/04/01

12/04/01

236

100

302 00 0092 / 5774

4300 S CALUMET AVE

1.0

0 01/10/02

01/10/02

236

100

300 06 0139 / 5289

4645 S DR MARTIN LUTHER KING JR DR

973.0

24,388 04/01/06

05/10/06

29,398

100

302 00 0092 / 5774

4645 S DR MARTIN LUTHER KING JR DR

28.0

0 02/01/01

12/31/01

6,598

100

805 06 1781 / 7967

5224 S INDIANA AVE

1.0

04/29/97

04/29/97

0 04/29/97

04/29/97

300

100

805 06 1863 / 8049

4611 S MARSHFIELD AVE

1.0

07/03/96

07/03/96

0 07/03/96

07/03/96

300

100

805 06 0410 / 6596

2103 S STATE ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0444 / 6630

2111 S STATE ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0445 / 6631

2123 S STATE ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0446 / 6632

2147 S STATE ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1517 / 7703

5659 S UNION AVE

1.0

10/30/97

10/30/97

0 10/30/97

10/30/97

300

100

805 06 0396 / 6582

4729 S VINCENNES AVE

1.0

08/31/95

08/31/95

0 08/31/95

08/31/95

300

100

805 06 0400 / 6586

1802 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0401 / 6587

1810 S WABASH AVE

1.0

02/14/95

02/14/95

0 02/14/95

02/14/95

300

100

805 06 0402 / 6588

1812 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0386 / 6572

1832 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0404 / 6590

1848 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0395 / 6581

1910 S WABASH AVE

1.0

02/14/95

02/14/95

0 02/14/95

02/14/95

300

100

805 06 0376 / 6562

1940 S WABASH AVE

1.0

02/14/95

02/14/95

0 02/14/95

02/14/95

300

100

805 06 0377 / 6563

2004 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0379 / 6565

2042 S WABASH AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

300 06 0069 / 5233

520 W GARFIELD BLVD

1.0

0 02/26/02

02/26/02

350

100

300 06 0069 / 5233

540 W GARFIELD BLVD

1.0

0 02/26/02

02/26/02

350

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping

03/01/06

09/01/06

1,024.0

24,388

42,854

Lamps

300 06 0215 / 5336

4645 S DR MARTIN LUTHER KING JR DR

1,088.0

06/01/07

12/31/07

32,030 10/18/07

10/24/07

31,062

100

300 06 0238 / 5352

4645 S DR MARTIN LUTHER KING JR DR

1,495.0

06/22/07

12/31/07

44,012 10/01/07

10/24/07

42,682

100

Totals per Arterial Group Relamping

2,583.0

76,042

73,744

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 41

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4645 S DR MARTIN LUTHER KING JR DR

Work Type: Direct Burial Cable 300 06 0277 / 5385

STATEWAY GARDENS

Work Type: Flood Light Install

Installations 2,488.0

0 07/06/02

07/09/02

45,302

100

27,782

100

Locations 1.0

05/01/04

05/31/04

25,000 05/01/04

Fixtures

300 06 0198 / 5323

ROBERT TAYLOR A (CHA)

56.0

01/19/01

01/31/01

96,104 01/19/01

01/31/01

49,020

100

300 06 0198 / 5323

ROBERT TAYLOR B (CHA)

56.0

01/19/01

01/31/01

0 01/19/01

01/31/01

37,447

100

300 06 0198 / 5323

STATEWAY GARDENS

44.0

01/02/01

01/16/01

251,500 01/02/01

01/16/01

146,728

100

300 06 0198 / 5323

WENTWORTH GARDEN (CHA)

06/11/01

06/13/01

23,024 04/16/01

04/20/01

23,024

100

300 06 0167 / 5306

E 35TH ST AND S WABASH AVE

3.0

0 06/10/99

06/10/99

1,053

100

302 00 0092 / 5774

W 45TH PL AND S PRINCETON AVE

2.0

0 05/02/01

05/02/01

941

100

302 00 0092 / 5774

W 45TH ST AND S PRINCETON AVE

3.0

0 05/02/01

05/02/01

1,412

100

302 00 0092 / 5774

4502 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4514 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4526 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4534 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4540 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4550 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4558 S PRINCETON AVE

1.0

0 08/25/01

08/25/01

404

100

302 00 0092 / 5774

4600 S PRINCETON AVE

2.0

0 05/02/01

05/02/01

941

100

300 06 0167 / 5306

4600 S STEWART AVE

1.0

0 07/20/99

07/20/99

351

100

300 09 / 33069

4420 S VINCENNES AVE

3.0

1,500 07/28/08

07/29/08

1,245

100

302 00 0092 / 5774

43 W 24TH ST

1.0

0 11/14/01

11/14/01

404

100

302 00 0092 / 5774

239 W SWANN ST

1.0

0 04/05/01

04/05/01

471

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

07/28/08

07/29/08

179.0

372,128

265,865

Blocks

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Lighting Imprvmnts

.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 42

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts

Installations

300 06 0244 / 5354

ROBERT TAYLOR A (CHA)

.0

06/26/09

04/06/10

300 06 0244 / 5354

ROBERT TAYLOR B (CHA)

1.0

05/01/06

12/31/07

1,576,800 06/05/06

300 06 0243 / 5353

STATEWAY GARDENS

.0

01/02/04

12/15/06

2,027,600 12/15/03

12/15/06

68,140

8

300 06 0313 / 5419

WENTWORTH GARDEN (CHA)

.0

05/01/07

09/28/07

686,000 02/17/06

12/18/06

14,126

100

300 06 0292 / 5399

1725 S CLARK ST

.0

03/31/05

04/12/05

12,136 03/31/05

04/12/05

10,573

100

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

300 06 / 33449

3700-3900 S VINCENNES AVE

.0

06/04/08

07/15/08

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

300 06 0292 / 5399

5014 S WELLS ST

.0

03/01/05

12/31/05

6,065 05/20/05

06/06/05

4,184

100

300 06 0292 / 5399

1512 W 47TH ST

.0

03/01/05

12/31/05

12,587 06/28/05

07/05/05

11,160

100

1.0

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts

0

0 36,000 06/20/08 0

4,357,188

0

0

467,688

95

0

0

35,755

60

611,626

Projects

300 06 0110 / 5265

ON S STATE ST FROM W 27TH ST TO W 30TH ST

1.0

300 06 0201 / 5325

E 41ST ST AND S INDIANA AVE

1.0

300 06 0110 / 5265

2900-3000 S FEDERAL ST

1.0

11/10/98

12/01/98

01/20/99

0 11/01/98

12/01/98

3.0

Totals per Lighting Imprvmnts

12,500 11/01/98

12,500 11/01/98

01/20/99

5,998

100

623

100

5,998

100

25,000

12,619

Blocks

Work Type: Loop Lighting 281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

0

0

0

.0

Totals per Loop Lighting

Work Type: Ornamental - Piggyback Lighting

Fixtures

300 09 / 33068

ON E 14TH PL FROM S STATE ST TO S WABASH AVE

300 09 / 33068

ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

300 09 / 33069

S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD

Totals per Ornamental - Piggyback Lighting

1.0

01/28/09

02/02/09

1,350 01/28/09

02/02/09

1,000

100

2.24

12/15/08

12/31/08

3,024 12/01/08

12/09/08

2,566

100

4.0

10/31/08

10/31/08

5,400 10/31/08

10/31/08

4,193

100

7.24

9,774

7,759

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 43

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting

Blocks

300 03 0003 / 4874

4600-4700 S DR MARTIN LUTHER KING JR DR

.0

11/29/06

12/08/06

0

0

75

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

300 11 / 32192

5627 S SHIELDS AVE

1.0

1,000

0

0

281 00 / 33670

1935 S WABASH AVE

.0

0

0

0

1,000

0

Totals per Ornamental Lighting

Work Type: POD Camera Pole

01/01/08

12/31/08

1.0

Poles

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

0

0

0

0

0

Totals per POD Camera Pole

Work Type: Residential Regrouping 300 06 0270 / 5378

5046 S STATE ST

.0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 44

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33069

ON E 38TH ST FROM S GILES AVE TO S DR MARTIN LUTHER KING JR DR

1.0

65,000

0

0

300 09 / 33069

1.0

65,000

0

0

300 09 / 33069

ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON S CALUMET AVE FROM E 38TH ST TO E PERSHING RD

65,000 04/01/08

12/01/08

0

0

300 07 0003 / 5426

ON S CALUMET AVE FROM E 45TH ST TO E 47TH ST

2.0

04/15/07

06/15/07

170,000 03/01/07

05/04/07

112,739

100

300 09 / 33069

ON S CALUMET AVE FROM E 51ST ST TO E 53RD ST

2.0

04/02/08

05/13/08

155,000 04/01/08

12/01/08

140,000

100

300 09 / 33069

ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST

.50

04/02/08

05/13/08

37,500 04/01/08

12/01/08

20,204

100

300 09 / 33069

ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST

.50

0

0

300 09 / 33069

ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33069

ON S GILES AVE FROM E 37TH ST TO E PERSHING RD

2.0

03/10/08

05/09/08

130,000 04/01/08

12/01/08

117,868

100

300 09 / 33069

ON S JUSTINE ST FROM W 45TH ST TO W 46TH ST

1.0

03/10/08

05/09/08

60,000 04/01/08

12/01/08

62,057

100

300 09 / 33069

ON S LOWE AVE FROM W 51ST ST TO W 54TH ST

3.0

02/18/08

05/09/08

275,000 04/01/08

12/01/08

187,621

100

300 09 / 33069

ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST

.52

33,800 04/01/08

12/01/08

0

0

300 07 0003 / 5426

ON S PRINCETON AVE FROM W 53RD ST TO W GARFIELD BLVD

2.0

05/01/07

07/01/07

200,000 03/21/07

07/06/07

110,513

100

300 07 0003 / 5426

ON S PRINCETON AVE FROM W GARFIELD BLVD TO W 57TH ST

2.0

04/20/07

07/01/07

200,000 03/12/07

06/14/07

101,516

100

300 09 / 33069

ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST

.50

32,500 04/01/08

12/01/08

0

0

300 06 0308 / 5414

ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST

2.0

03/16/06

12/31/06

224,237 09/18/06

04/06/07

167,169

100

300 07 0003 / 5426

ON S VINCENNES AVE FROM E 45TH ST TO E 47TH ST

2.0

04/10/07

06/10/07

170,000 03/19/07

06/15/07

111,580

100

300 09 / 33069

ON S WABASH AVE FROM E 42ND ST TO E 43RD ST

1.0

65,000 04/01/08

12/01/08

0

0

300 05 0011 / 5126

ON W 46TH ST FROM S STEWART AVE TO S UNION AVE

1.0

04/04/05

11/18/05

85,000 09/08/05

11/11/05

50,929

100

300 07 0003 / 5426

ON W 49TH PL FROM S UNION AVE TO S HALSTED ST

1.0

04/01/07

06/01/07

56,000 03/09/07

05/04/07

42,760

100

300 07 0003 / 5426

ON W 50TH PL FROM S HALSTED ST TO S PEORIA ST

1.0

04/01/07

06/01/07

85,000 03/09/07

05/04/07

42,760

100

300 07 0003 / 5426

ON W 50TH PL FROM S UNION AVE TO S HALSTED ST

1.0

04/01/07

06/01/07

57,000 03/09/07

05/04/07

42,760

100

300 07 0003 / 5426

ON W 50TH ST FROM S HALSTED ST TO S PEORIA ST

1.0

04/01/07

06/01/07

85,000 03/09/07

05/04/07

42,760

100

300 07 0003 / 5426

ON W 50TH ST FROM S UNION AVE TO S HALSTED ST

1.0

04/01/07

06/01/07

57,000 03/09/07

05/04/07

42,760

100

300 07 0003 / 5426

E 43RD ST AND S VERNON AVE

1.0

04/15/07

05/15/07

42,500 03/19/07

06/15/07

12,345

100

Totals per Residntl Staggered Lighting

1.0

31.02

32,500

2,448,037

1,408,341

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 45

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 03 0002 / 4873

ON S GILES AVE FROM E 31ST ST TO E 35TH ST

.24

38,400 09/09/04

12/31/04

22,216

100

300 06 0166 / 5305

ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST

1.0

10,023 11/07/00

11/11/00

0

100

300 06 0193 / 5318

ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST

1.0

0 11/07/00

11/11/00

34,869

100

300 06 0267 / 5375

ON S VINCENNES AVE FROM E 47TH ST TO E 48TH ST

2.0

10/01/04

12/30/04

176,292 10/21/04

12/21/04

143,894

100

300 06 0235 / 5349

ON W 54TH PL FROM S WALLACE ST TO S HALSTED ST

2.0

06/30/03

08/29/03

122,274 06/18/03

10/03/03

129,873

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial

09/15/04

11/15/04

6.24

346,989

330,852

Locations

302 00 0092 / 5774

4521 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4541 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4621 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4647 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

281 00 / 33670

4100 S MICHIGAN AVE

302 00 0092 / 5774

4517 S PAULINA ST

1.0

0 02/23/01

302 00 0092 / 5774

4539 S PAULINA ST

1.0

302 00 0092 / 5774

4619 S PAULINA ST

1.0

302 00 0092 / 5774

4645 S PAULINA ST

1.0

281 00 / 33670

1935 S WABASH AVE

Totals per Short Arm Installs - Arterial

Work Type: Short Arm Installs - Residntl

.0

.0

01/01/08

01/01/08

12/31/08

12/31/08

8.0

0

0

0

02/23/01

378

100

0 02/23/01

02/23/01

378

100

0 02/23/01

02/23/01

378

100

0 02/23/01

02/23/01

378

100

0

0

0

0

3,024

Locations

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Short Arm Installs - Residntl

.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 46

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0081 / 5244

ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE

2.08

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

1.40

302 00 0077 / 5765

ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR

300 09 / 33069

ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE

302 00 0077 / 5765

ON S CLARK ST FROM W 17TH ST TO W 18TH ST

300 11 / 32192

ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST

125.0

07/20/07

300 05 0003 / 5118

ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST

28.0

04/04/05

300 06 0108 / 5263

ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST

90.0

300 09 / 33068

ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST

1.62

302 00 0077 / 5765

ON S STATE ST FROM W 17TH ST TO E 18TH ST

19.0

300 09 / 33069

ON S WELLS ST FROM W PERSHING RD TO W ROOT ST

300 06 0225 / 5340

ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST

300 09 / 33069

S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD

4.0

300 06 0081 / 5244

1800 S WABASH AVE

2.0

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc

0 05/23/98

05/23/98

132

100

350 06/13/07

06/24/08

294

100

0 08/25/99

08/31/99

1,529

100

600 06/23/08

06/27/08

378

0

0 11/11/99

11/12/99

830

100

08/10/07

27,500 07/20/07

08/10/07

27,500

100

11/18/05

7,000 08/20/05

08/24/05

6,056

100

05/28/03

06/15/03

21,500 07/01/03

07/28/03

22,120

100

05/29/08

06/20/08

405 05/29/08

06/20/08

340

100

0 11/11/99

11/12/99

1,660

100

05/28/08

06/20/08

17.50 3.0

06/23/08

06/27/08

9.50

5.0

06/10/08

06/26/08

1,000 06/10/08

06/13/08

650

100

05/30/03

06/17/03

3,625 05/30/03

06/17/03

5,285

100

10/29/08

10/29/08

1,200 10/29/08

10/29/08

840

100

0 05/23/98

05/23/98

127

100

308.10

63,180

67,741

Blocks

281 00 / 33670

4100 S MICHIGAN AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1935 S WABASH AVE

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Strt Lighting 300 06 0225 / 5340

ON W TREMONT ST FROM S NORMAL AVE TO S STEWART AVE

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

4645 S DR MARTIN LUTHER KING JR DR

.0

Blocks 2.0

01/05/04

01/30/04

50,000 05/06/03

01/09/04

37,760

100

03/01/04

12/01/04

21,549 07/31/06

09/15/06

45,128

100

Lamps 4,144.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 47

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

302 00 0072 / 5760

330 E 40TH ST

805 06 2344 / 8530

1540 E 47TH DR

302 00 0071 / 5759

4000 S CALUMET AVE

300 06 0099 / 5260

4645 S DR MARTIN LUTHER KING JR DR

302 00 0071 / 5759

4830 S HALSTED ST

805 06 2387 / 8573

3901 S LA SALLE ST

6.0

302 00 0072 / 5760

5800 S LOWE AVE

1.0

805 06 2962 / 9148

5801 S LOWE AVE

6.0

01/21/93

805 06 2579 / 8765

4005 S MICHIGAN AVE

4.0

805 06 2264 / 8450

4901 S MORGAN ST

805 06 2280 / 8466

1.0

0 05/04/00

05/04/00

1,935

100

0 06/04/93

06/04/93

7,500

100

0 12/13/98

12/14/98

3,105

100

37,321 07/15/03

07/23/03

27,122

100

0 10/30/98

11/04/98

5,625

100

0 07/18/95

07/18/95

4,500

100

0 03/27/00

03/29/00

6,370

100

01/21/93

0 01/21/93

01/21/93

4,500

100

03/29/95

03/29/95

0 03/29/95

03/29/95

3,000

100

12.0

10/18/94

10/18/94

0 10/18/94

10/18/94

9,000

100

4901 S MORGAN ST

12.0

10/18/94

10/18/94

0 10/18/94

10/18/94

9,000

100

805 06 2551 / 8737

4005 S PRAIRIE AVE

4.0

04/12/95

04/12/95

0 04/12/95

04/12/95

3,000

100

302 00 0071 / 5759

4000 S PRINCETON AVE

0 11/08/98

11/13/98

4,654

100

805 06 2629 / 8815

1595 S STATE ST

0 11/08/93

11/08/93

9,000

100

302 00 0071 / 5759

4910 S UNION AVE

0 12/04/98

12/09/98

6,594

100

805 06 2841 / 9027

1598 S WABASH AVE

12.0

12/28/93

12/28/93

0 12/28/93

12/28/93

9,000

100

805 06 2577 / 8763

4020 S WABASH AVE

8.0

05/07/93

05/07/93

0 05/07/93

05/07/93

6,000

100

302 00 0071 / 5759

4000 S WELLS ST

0 11/27/98

12/01/98

4,654

100

302 00 0072 / 5760

3900 S WENTWORTH AVE

0 02/03/00

02/04/00

3,400

100

805 06 2643 / 8829

105 W 18TH ST

10.0

10/18/93

10/18/93

0 10/18/93

10/18/93

7,500

100

805 06 2702 / 8888

116 W 27TH ST

8.0

03/30/94

03/30/94

0 03/30/94

03/30/94

6,000

100

805 06 2699 / 8885

100 W 33RD ST

12.0

07/02/91

07/02/91

0 07/02/91

07/02/91

9,000

100

805 06 2700 / 8886

98 W 35TH ST

14.0

03/28/91

03/28/91

0 03/28/91

03/28/91

10,500

100

805 06 2701 / 8887

109 W 37TH ST

8.0

04/11/94

04/11/94

0 04/11/94

04/11/94

6,000

100

302 00 0071 / 5759

400 W 42ND PL

0 06/18/98

06/30/98

29,086

100

302 00 0071 / 5759

400 W 42ND ST

0 05/23/98

06/03/98

18,347

100

805 06 2803 / 8989

39 W 43RD ST

42.0

09/01/92

09/01/92

0 09/01/92

09/01/92

31,500

100

805 06 2538 / 8724

331 W 43RD ST

28.0

12/31/91

12/31/91

0 12/31/91

12/31/91

21,000

100

302 00 0070 / 5758

400 W 43RD ST

0 12/03/97

12/12/97

16,069

100

805 06 2154 / 8340

400 W 43RD ST

43.0

12/01/97

12/12/97

0 12/01/97

12/12/97

32,250

100

805 06 2696 / 8882

149 W 44TH ST

20.0

08/03/94

08/03/94

0 08/03/94

08/03/94

15,000

100

10.0

664.0

12.0

06/04/93

07/15/03

07/18/95

11/08/93

06/04/93

07/23/03

07/18/95

11/08/93

1.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 48

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2703 / 8889

149 W 45TH PL

12.0

06/20/94

06/20/94

0 06/20/94

06/20/94

9,000

100

805 06 2698 / 8884

160 W 46TH ST

12.0

04/06/94

04/06/94

0 04/06/94

04/06/94

9,000

100

805 06 2520 / 8706

401 W 46TH ST

50.0

08/01/91

08/01/91

0 08/01/91

08/01/91

37,500

100

805 06 2791 / 8977

117 W 47TH ST

14.0

01/01/93

01/01/93

0 01/01/93

01/01/93

10,500

100

805 06 2561 / 8747

499 W 47TH ST

12.0

05/17/93

05/17/93

0 05/17/93

05/17/93

9,000

100

805 06 2628 / 8814

499 W 47TH ST

16.0

04/04/93

04/04/93

0 04/04/93

04/04/93

12,000

100

805 06 2548 / 8734

105 W 51ST ST

24.0

02/04/94

02/04/94

0 02/04/94

02/04/94

18,000

100

805 06 2479 / 8665

330 W 51ST ST

51.0

10/14/95

10/14/95

0 10/14/95

10/14/95

38,250

100

805 06 2480 / 8666

330 W 51ST ST

9.0

10/14/95

10/14/95

0 10/14/95

10/14/95

6,750

100

805 06 2481 / 8667

330 W 51ST ST

32.0

10/14/95

10/14/95

0 10/14/95

10/14/95

24,000

100

805 06 2483 / 8669

330 W 51ST ST

20.0

10/14/95

10/14/95

0 10/14/95

10/14/95

15,000

100

805 06 2484 / 8670

330 W 51ST ST

27.0

10/14/95

10/14/95

0 10/14/95

10/14/95

20,250

100

805 06 2485 / 8671

330 W 51ST ST

8.0

10/14/95

10/14/95

0 10/14/95

10/14/95

6,000

100

805 06 2486 / 8672

330 W 51ST ST

8.0

10/14/95

10/14/95

0 10/14/95

10/14/95

6,000

100

805 06 2505 / 8691

330 W 51ST ST

15.0

10/14/95

10/14/95

0 10/14/95

10/14/95

11,250

100

805 06 2506 / 8692

330 W 51ST ST

16.0

10/14/95

10/14/95

0 10/14/95

10/14/95

12,000

100

805 06 2497 / 8683

629 W 51ST ST

13.0

10/14/95

10/14/95

0 10/14/95

10/14/95

9,750

100

805 06 2498 / 8684

629 W 51ST ST

8.0

10/14/95

10/14/95

0 10/14/95

10/14/95

6,000

100

805 06 2500 / 8686

629 W 51ST ST

9.0

10/14/95

10/14/95

0 10/14/95

10/14/95

6,750

100

805 06 2501 / 8687

629 W 51ST ST

17.0

10/14/95

10/14/95

0 10/14/95

10/14/95

12,750

100

805 06 2502 / 8688

629 W 51ST ST

16.0

10/14/95

10/14/95

0 10/14/95

10/14/95

12,000

100

805 06 2503 / 8689

629 W 51ST ST

12.0

10/14/95

10/14/95

0 10/14/95

10/14/95

9,000

100

805 06 2504 / 8690

629 W 51ST ST

10.0

10/14/95

10/14/95

0 10/14/95

10/14/95

7,500

100

805 06 2359 / 8545

101 W 53RD ST

12.0

02/02/94

02/02/94

0 02/02/94

02/02/94

9,000

100

805 06 2487 / 8673

699 W 54TH PL

28.0

10/20/94

10/20/94

0 10/20/94

10/20/94

21,000

100

805 06 2678 / 8864

105 W 57TH ST

12.0

07/19/94

07/19/94

0 07/19/94

07/19/94

9,000

100

805 06 2826 / 9012

595 W 57TH ST

12.0

03/05/93

03/05/93

0 03/05/93

03/05/93

9,000

100

805 06 2847 / 9033

599 W 58TH ST

8.0

10/17/94

10/17/94

0 10/17/94

10/17/94

6,000

100

805 06 2339 / 8525

500 W GARFIELD BLVD

16.0

03/29/93

03/29/93

0 03/29/93

03/29/93

12,000

100

805 06 2950 / 9136

127 W PERSHING RD

12.0

01/01/91

01/01/91

0 01/01/91

01/01/91

9,000

100

805 06 2563 / 8749

61 W ROOT ST

12.0

01/24/94

01/24/94

0 01/24/94

01/24/94

9,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 49

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting Totals per Underpass Lighting

Fixtures 1,461.0

37,321

722,461

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 50

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S ARCHER AVE AND S STATE ST

1.0

0 01/14/02

01/14/02

6,427

100

210 06 0130 / 4389

S CLARK ST AND S ARCHER AVE

.50

0 09/10/01

09/10/01

4,472

100

Totals per LED Signal Head Install

Work Type: Removal Temp Wiring - Signals

1.50

0

Crossings

300 06 0197 / 5322

S DR MARTIN LUTHER KING JR DR AND E 37TH ST

.50

300 06 0197 / 5322

S INDIANA AVE AND E 43RD ST

1.0

300 06 0197 / 5322

S MICHIGAN AVE AND E 43RD ST

1.0

04/20/01

300 06 0197 / 5322

S WABASH AVE AND E 41ST ST

1.0

04/24/01

Totals per Removal Temp Wiring - Signals

Work Type: Signal Removal 300 06 0117 / 5271

3500 S WABASH AVE

Work Type: Signals 300 06 0096 / 5258

4645 S DR MARTIN LUTHER KING JR DR

Work Type: TSM Install

10,899

03/16/01

04/20/01

2,000 03/16/01

06/07/01

2,748

100

4,000 04/12/01

04/27/01

7,914

100

04/25/01

4,000 04/20/01

04/25/01

4,362

100

05/01/01

4,000 04/12/01

04/13/01

144

100

3.50

14,000

15,168

Locations 1.0

5,255 07/17/99

08/26/99

2,371

100

9,645

100

Intersections 61.0

08/18/03

08/25/03

0 08/20/03

08/25/03

Locations

814 06 0281 / 16493

4500 S ASHLAND AVE

1.0

08/23/90

08/23/90

0 08/23/90

08/23/90

90,100

100

814 06 0115 / 16330

3900 S DR MARTIN LUTHER KING JR DR

1.0

04/26/94

04/26/94

0 04/26/94

04/26/94

188,654

100

814 06 0214 / 16426

2400 S STATE ST

1.0

10/25/94

10/25/94

0 10/25/94

10/25/94

120,000

100

814 06 0346 / 16544

2400 S STATE ST

1.0

08/01/96

08/01/96

0 08/01/96

04/04/97

200,000

100

814 06 0142 / 16356

1600 S WABASH AVE

1.0

09/24/97

09/24/97

0 09/24/97

09/24/97

200,000

100

814 06 0126 / 16340

1800 S WABASH AVE

1.0

09/24/97

09/24/97

0 09/24/97

09/24/97

200,000

100

814 06 0127 / 16341

2000 S WABASH AVE

1.0

09/24/97

09/24/97

0 09/24/97

09/24/97

200,000

100

814 06 0100 / 16315

3900 S WABASH AVE

1.0

04/25/94

04/25/94

0 04/25/94

04/25/94

85,397

100

Totals per TSM Install Totals per Traffic

8.0

0

1,284,151

35,033

1,337,314

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 51

1/1/2008 AND 12/31/2008

Ward 03 Pat Dowell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 09 / 33068

ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR

.14

05/28/08

06/20/08

28 04/01/08

12/01/08

12

100

300 11 / 32192

ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST

33.0

07/20/07

08/10/07

11,550 07/20/07

08/10/07

11,550

100

300 09 / 33068

E 31ST ST AND S INDIANA AVE

10.0

06/02/08

06/20/08

3,800 06/02/08

06/20/08

3,225

100

300 09 / 33069

S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD

2.0

10/29/08

10/29/08

400 10/29/08

10/29/08

294

100

Totals per Traffic Equipment Painting

45.14

15,778

15,081

Totals per Construction Phase

7,991,384

5,130,939

Totals for Ward 03

8,065,984

5,229,797

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 52

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0245 / 5355

IDA B WELLS HOMES

.0

03/01/02

02/28/03

0 03/01/02

02/28/05

57,776

100

300 06 0308 / 5414

ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,592

100

300 06 / 32146

ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST

1.0

05/01/07

10/31/07

6,000

2,500

100

300 06 0282 / 5390

353 E 26TH ST

1.0

11/05/04

12/14/04

1,000 11/01/04

1,859

100

Totals per Design/Engineering

2.0

7,000

12/14/04

64,727

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 53

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Fixtures

Work Type: 250 Watt Changeout 300 09 / 33069

ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE

300 05 0005 / 5120 300 06 0122 / 5275

2.25

06/25/08

06/27/08

900 06/25/08

06/26/08

619

100

Materials Ordered Note Last Updated on 12-JUN-08 ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

700 E 40TH ST

2.0

12/10/03

12/10/03

950 12/08/03

12/08/03

1,106

100

9.25

Totals per 250 Watt Changeout

3,850

2,980

Fixtures

Work Type: 400 Watt Changeout 300 09 / 33068

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

3.84

05/28/08

06/20/08

1,600 05/28/08

06/06/08

1,202

100

300 09 / 33069

ON E OAKWOOD BLVD FROM S VINCENNES AVE TO S DREXEL BLVD

10.0

06/26/08

06/27/08

4,000 06/26/08

06/27/08

3,000

100

Materials Ordered Note Last Updated on 12-JUN-08 Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

13.84

5,600

4,202

Installations

805 06 1049 / 7235

ON E 53RD ST FROM S WOODLAWN AVE TO S KIMBARK AVE

1.0

03/07/97

03/07/97

0 03/07/97

03/07/97

300

300 06 0096 / 5258

449 E 35TH ST

589.0

03/01/03

09/01/03

15,284 03/01/06

09/01/06

17,796

0

302 00 0092 / 5774

449 E 35TH ST

12.0

0 04/02/01

11/28/01

2,828

100

302 00 0092 / 5774

4105 S DREXEL AVE

1.0

300 06 0139 / 5289

4646 S DREXEL AVE

626.0

302 00 0092 / 5774

4646 S DREXEL BLVD

8.0

805 06 1544 / 7730

4141 S ELLIS AVE

1.0

10/23/97

805 06 0341 / 6527

4239 S LANGLEY AVE

1.0

02/14/95

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

4659 S COTTAGE GROVE AVE

Work Type: Arterial Strt Lighting/Lamps

03/01/06

100

0 06/08/01

06/08/01

236

100

14,445 04/01/06

04/15/06

18,914

100

0 01/31/01

01/15/02

1,885

100

10/23/97

0 10/23/97

10/23/97

300

100

02/14/95

0 02/14/95

02/14/95

300

100

09/01/06

1,239.0

29,729

42,559

Lamps 1,275.0

06/01/07

12/31/07

37,536 10/15/07

10/24/07

36,401

100

Installations

300 06 0053 / 5228

449 E 35TH ST

5,122.0

0 07/17/02

07/20/02

93,262

100

300 06 0053 / 5228

4646 S DREXEL BLVD

2,154.0

0 07/14/02

07/17/02

39,220

100

7,276.0

0

132,482

8,881,404

5,538,004

Totals per Arterial Strt Lighting/Lamps Totals per Lighting/Electrical

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 54

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 06 0198 / 5323

IDA B WELLS HOMES

04/25/01

05/15/01

85,465 04/20/01

05/11/01

107,793

100

300 06 0198 / 5323

LAKE PARK PLACE (CHA)

05/16/01

05/17/01

9,000 05/12/01

05/14/01

7,512

100

300 06 0198 / 5323

WASHINGTON PARK HOMES (CHA)

03/09/01

06/29/01

13,200 06/02/01

06/02/01

8,569

100

300 06 0167 / 5306

4715 S ELLIS AVE

2.0

0 05/20/99

05/20/99

188

100

300 06 0167 / 5306

4731 S ELLIS AVE

2.0

0 05/20/99

05/20/99

188

100

300 06 0167 / 5306

4752 S ELLIS AVE

2.0

0 05/20/99

05/20/99

188

100

300 06 0072 / 5235

5300 S HYDE PARK BLVD

0 07/05/01

07/05/01

2,382

08/03/01 6.0

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0245 / 5355

IDA B WELLS HOMES

300 06 0227 / 5342

LAKE PARK PLACE (CHA)

300 06 0210 / 5333

ON S DREXEL BLVD FROM E 41ST ST TO E BOWEN AVE

300 06 / 33449 300 06 / 33449

.0

10/01/04

05/29/07

1,561,200 12/12/03

107.0

05/01/02

12/15/05

1,727,200 06/12/02

90.0

07/23/02

12/15/05

2,225,200 08/14/02

600-800 E 37TH ST

.0

06/04/08

07/15/08

3700-3900 S VINCENNES AVE

.0

06/04/08

07/15/08

Work Type: Lighting Imprvmnts

197.0

.0

04/01/07

873,579

100

950,168

80

1,617,480

100

72,000 06/20/08

71,510

60

36,000 06/20/08

35,755

60

02/01/06

5,621,600

3,548,492

10/06/04

10/31/04

0 06/30/06

06/30/06

0

0

11/24/08

12/05/08

6,912 11/24/08

12/05/08

5,864

100

0 11/28/97

09/30/98

Fixtures

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

Work Type: Ornamental Lighting

126,820

Projects

353 E 26TH ST

Work Type: Ornamental - Piggyback Lighting 300 09 / 33068

107,665

Installations

Totals per Lighting Imprvmnts

300 06 0282 / 5390

09/28/01

5.12

Blocks

300 06 0063 / 5230

ON E 53RD ST FROM S WOODLAWN AVE TO S HARPER AVE

3.0

988

100

300 09 / 33071

ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST

1.0

135,000

0

0

4.0

135,000

988

0

0

Totals per Ornamental Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

4659 S COTTAGE GROVE AVE

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 55

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33070

ON E 40TH ST FROM S VINCENNES AVE TO S COTTAGE GROVE AVE

2.0

146,250 04/01/08

12/01/08

0

300 09 / 33070

ON E 41ST ST FROM S ST LAWRENCE AVE TO S VINCENNES AVE

1.0

65,000 04/01/08

12/01/08

0

0

300 11 / 32193

ON E 42ND ST FROM S COTTAGE GROVE AVE TO S ST LAWRENCE AVE

2.0

04/01/08

06/02/08

145,000 11/08/07

12/21/07

109,326

100

300 07 0004 / 5427

ON E 50TH ST FROM S CHAMPLAIN AVE TO S FORRESTVILLE AVE

1.0

07/10/06

08/18/06

65,000 01/08/07

05/07/07

56,412

100

300 07 0004 / 5427

2.0

07/05/06

09/01/06

170,000 03/13/07

05/11/07

101,516

100

300 09 / 33070

ON E BOWEN AVE FROM S COTTAGE GROVE AVE TO S ST LAWRENCE AVE ON E BOWEN AVE FROM S ST LAWRENCE AVE TO S VINCENNES AVE

65,000 04/01/08

12/01/08

0

0

300 09 / 33069

ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST

.50

04/02/08

05/13/08

37,500 04/01/08

12/01/08

20,204

100

300 05 0004 / 5119

ON S CHAMPLAIN AVE FROM E 47TH ST TO E 49TH ST

2.0

09/01/05

10/15/05

170,000 08/22/05

10/07/05

108,764

100

300 07 0004 / 5427

ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST

.50

07/17/06

09/08/06

21,250 09/01/06

11/27/06

0

100

300 07 0005 / 5428

ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST

.50

04/01/07

06/01/07

21,250 09/01/06

11/27/06

0

100

300 09 / 33070

ON S ELLIS AVE FROM E 41ST ST TO E 43RD ST

2.0

146,250 04/01/08

12/01/08

0

0

300 05 0004 / 5119

ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST

2.0

04/04/05

11/18/05

80,000 07/05/05

08/15/05

0

100

300 06 0298 / 5405

ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST

2.0

06/01/05

07/01/05

0 07/05/05

09/07/05

141,762

100

300 09 / 33070

ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST

.50

32,500 04/01/08

12/01/08

0

0

300 09 / 33071

ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST

.50

32,500

300 07 0004 / 5427

ON S ELLIS AVE FROM E OAKWOOD BLVD TO E 41ST ST

2.0

300 09 / 33069

ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST

.50

300 09 / 33069

ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST

300 06 0308 / 5414

1.0

0

0

100

0

0

08/18/06

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST

2.0

06/06/06

08/06/06

106,834 05/15/06

07/26/06

93,887

100

300 09 / 33070

ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST

1.0

65,000 04/01/08

12/01/08

0

0

300 07 0004 / 5427

ON S LANGLEY AVE FROM E 47TH ST TO E 49TH ST

2.0

06/26/06

08/18/06

170,000 06/23/06

09/01/06

114,972

100

300 09 / 33069

ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST

.50

32,500 04/01/08

12/01/08

0

0

300 06 / 32146

ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST

4.0

12/05/07

06/30/08

326,440

0

0

2,120,774

746,843

Totals per Residntl Staggered Lighting

01/15/07

0

06/19/06

31.50

190,000 06/19/06

0

32,500

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 56

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Strt Lighting/Lamps 300 03 0004 / 4875

ON E 50TH PL FROM S CHAMPLAIN AVE TO S COTTAGE GROVE AVE

2.0

11/01/04

12/31/04

160,000 11/24/04

04/01/05

101,483

100

300 06 0267 / 5375

ON S EVANS AVE FROM E 47TH ST TO E 49TH ST

2.0

10/01/04

12/01/04

186,059 08/27/04

11/19/04

178,444

100

300 06 0235 / 5349

ON S GREENWOOD AVE FROM E 43RD ST TO E 45TH ST

2.0

06/15/03

08/15/03

161,392 06/12/03

09/18/03

141,143

100

300 03 0004 / 4875

ON S GREENWOOD AVE FROM E 45TH ST TO E 47TH ST

2.0

10/15/04

12/15/04

160,000 11/15/04

04/01/05

107,774

100

300 06 0166 / 5305

ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST

1.0

10,023 11/07/00

11/11/00

0

100

300 06 0193 / 5318

ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST

1.0

0 11/07/00

11/11/00

34,869

100

10.0

Totals per Residntl Strt Lighting/Lamps

Work Type: Strt Light Pole Painting

677,474

563,713

Locations

300 09 / 33068

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

3.52

05/28/08

06/20/08

880 06/06/07

06/10/08

739

100

300 04 0216 / 5114

ON E 47TH ST FROM S DREXEL BLVD TO S GREENWOOD AVE

19.0

05/01/06

11/01/06

4,109 05/17/06

06/22/06

4,109

100

300 04 0216 / 5114

ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE

14.50

05/01/06

11/01/06

3,100 05/17/06

09/09/06

3,100

100

300 11 / 32193

ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST

112.0

06/01/07

08/01/07

24,640 06/01/07

06/21/07

24,640

100

302 00 0076 / 5764

5200 S CORNELL AVE

5.0

06/04/98

06/04/98

0 06/04/98

06/04/98

85

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

154.02

32,729

32,673

Blocks

300 06 0134 / 5287

ON E 38TH PL FROM S VINCENNES AVE TO S LANGLEY AVE

1.0

08/01/99

09/30/99

16,333 08/01/99

09/01/99

6,158

100

300 06 0134 / 5287

ON E 38TH ST FROM S VINCENNES AVE TO S LANGLEY AVE

1.0

08/01/99

09/30/99

16,334 08/01/99

09/01/99

6,159

100

300 03 0004 / 4875

ON S LAKE PARK AVE FROM E 43RD ST TO E 46TH ST

3.0

08/30/04

09/08/04

12,500 08/30/04

09/13/04

6,721

100

300 06 0134 / 5287

600-699 E 37TH PL

1.0

08/01/99

09/30/99

16,333 08/01/99

09/01/99

6,158

100

6.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping

61,500

25,196

Lamps

300 06 0139 / 5289

449 E 35TH ST

1,730.0

03/01/04

12/01/04

8,996 07/31/06

09/11/06

18,839

100

300 06 0139 / 5289

4646 S DREXEL AVE

1,730.0

03/01/04

12/01/04

8,996 09/08/06

09/11/06

18,839

100

Totals per Traffic Signal Regrouping

3,460.0

17,992

37,678

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 57

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0099 / 5260

449 E 35TH ST

280.0

07/10/03

07/14/03

15,737 07/10/03

07/14/03

10,810

100

805 06 2147 / 8333

1405 E 47TH DR

46.0

06/04/93

06/04/93

0 06/04/93

06/04/93

34,500

100

805 06 2108 / 8294

1550 E 53RD ST

22.0

01/02/92

01/02/92

0 01/02/92

01/02/92

16,500

100

302 00 0070 / 5758

1600 E 53RD ST

0 10/24/97

11/01/97

17,176

100

302 00 0071 / 5759

1600 E 55TH ST

0 07/10/98

07/20/98

24,196

100

805 06 2164 / 8350

1538 E HYDE PARK BLVD

0 12/31/95

12/31/95

18,000

100

302 00 0070 / 5758

1600 E HYDE PARK BLVD

0 06/24/97

07/03/97

15,848

100

805 06 2116 / 8302

1600 E HYDE PARK BLVD

42.0

07/03/97

07/03/97

0 07/03/97

07/03/97

31,500

100

805 06 2403 / 8589

1045 E OAKWOOD BLVD

10.0

03/03/96

03/03/96

0 03/03/96

03/03/96

7,500

100

805 06 2404 / 8590

1057 E OAKWOOD BLVD

10.0

03/03/96

03/03/96

0 03/03/96

03/03/96

7,500

100

300 06 0099 / 5260

4646 S DREXEL AVE

130.0

07/24/03

07/25/03

7,306 07/24/03

07/25/03

4,082

100

805 06 2859 / 9045

405 W 31ST ST

26.0

02/26/90

02/26/90

0 02/26/90

02/26/90

19,500

100

805 06 2853 / 9039

401 W 33RD ST

32.0

02/12/89

02/12/89

0 02/12/89

02/12/89

24,000

100

Totals per Underpass Lighting

24.0

622.0

12/31/95

12/31/95

23,043

231,112

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 58

1/1/2008 AND 12/31/2008

Ward 04 Toni Preckwinkle CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install 210 06 0130 / 4389

Locations

S CORNELL AVE AND E 47TH ST

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

S DR MARTIN LUTHER KING JR DR AND E 37TH ST

300 06 0197 / 5322

S LAKE PARK AVE AND E 55TH ST

1.0

11/05/02

1,850

100

2,000 03/16/01

06/07/01

2,748

100

6,000 04/08/02

04/08/02

0

100

Crossings .50

03/16/01

04/20/01

1.50 2.0

Totals per Removal Temp Wiring - Signals

Work Type: Signals

0 11/05/02

8,000

2,748

Intersections

300 06 0096 / 5258

449 E 35TH ST

83.0

07/07/03

07/13/03

0 07/03/06

10/11/06

13,124

100

300 06 0096 / 5258

4646 S DREXEL AVE

40.0

08/18/03

08/25/03

0 08/13/03

08/20/03

6,325

100

123.0

Totals per Signals

Work Type: TSM Install

0

19,449

Locations

814 06 0092 / 16308

400 E 29TH ST

1.0

02/01/94

02/01/94

0 02/01/94

02/01/94

98,691

100

814 06 0090 / 16306

700 E 31ST DR

1.0

02/09/94

02/09/94

0 02/09/94

02/09/94

98,691

100

814 06 0094 / 16310

790 E 31ST DR

1.0

02/15/94

02/15/94

0 02/15/94

02/15/94

98,691

100

814 06 0095 / 16311

3099 S COTTAGE GROVE AVE

1.0

02/02/94

02/02/94

0 02/02/94

02/02/94

98,691

100

814 06 0243 / 16455

3099 S COTTAGE GROVE AVE

1.0

01/01/94

01/01/94

0 01/01/94

01/01/94

120,000

100

814 06 0101 / 16316

4300 S DREXEL BLVD

1.0

03/18/94

03/18/94

0 03/18/94

03/18/94

125,859

100

814 06 0165 / 16377

5500 S LAKE PARK AVE

1.0

08/01/96

02/07/97

0 08/01/96

02/07/97

200,000

100

814 06 0310 / 16522

3900 S VINCENNES AVE

1.0

01/10/89

01/10/89

0 01/10/89

01/10/89

85,266

100

8.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

0

925,889

Locations

300 09 / 33068

ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE

300 11 / 32193

ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST

.32

05/28/08

06/20/08

64 04/01/08

12/01/08

40

100

56.0

06/01/07

08/01/07

20,400 06/01/07

08/01/07

20,400

100

56.32

20,464

20,440

28,464

970,376

Totals per Construction Phase

8,909,868

6,508,379

Totals for Ward 04

8,916,868

6,573,106

Totals per Traffic Equipment Painting Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 59

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE

4.0

04/01/08

08/30/08

260,000 04/15/08

0

90

300 06 0275 / 5383

ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE

.0

10/01/04

06/30/05

0 10/01/04

06/30/05

2,675

100

210 10 0025 / 4565

E 71ST ST AND S DORCHESTER AVE

.0

03/01/03

12/31/04

0 06/11/02

06/25/04

4,059

100

210 06 / 32040

E MARQUETTE DR AND S RICHARDS DR

.0

09/02/06

10/27/06

6,000 09/02/06

10/27/06

0

100

300 06 0282 / 5390

S DREXEL AVE AND S SOUTH CHICAGO AVE

1.0

08/04/04

01/25/05

4,000 11/01/04

02/15/05

1,755

100

300 06 0292 / 5399

S DREXEL AVE AND S SOUTH CHICAGO AVE

.0

01/20/05

12/21/05

0 01/20/05

12/21/05

0

0

281 00 / 33670

1008-1010 E 59TH ST

.0

01/01/08

12/31/08

0

300 06 0292 / 5399

1532 E 76TH ST

1.0

06/06/05

07/19/05

Totals per Design/Engineering

6.0

2,000 05/13/05 272,000

07/19/05

0

0

0

100

8,489

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 60

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0005 / 5428

ON E 54TH ST FROM S COTTAGE GROVE AVE TO S DREXEL AVE

5.0

04/18/06

11/18/06

2,000 06/21/06

06/21/06

0

100

300 09 / 33071

ON E 61ST ST FROM S HARPER AVE TO S STONY ISLAND AVE

5.0

10/24/08

10/24/08

2,000 10/24/08

10/24/08

1,375

100

300 03 0005 / 4876

ON E 66TH PL FROM S STONY ISLAND AVE TO S BLACKSTONE AVE

9.0

06/18/04

06/21/04

3,500 06/11/04

06/15/04

1,742

100

302 00 0092 / 5774

ON E 67TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE

3.0

01/21/02

01/23/02

0 01/29/02

01/29/02

618

100

302 00 0092 / 5774

ON E 68TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE

3.0

01/21/02

01/23/02

0 01/29/02

01/29/02

618

100

300 03 0005 / 4876

ON E 68TH ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE

10.0

06/01/05

06/10/05

4,000 05/06/05

05/19/05

1,978

100

300 03 0005 / 4876

ON E 68TH ST FROM S HARPER AVE TO S DORCHESTER AVE

15.0

06/01/05

06/10/05

6,000 05/06/05

05/19/05

2,967

100

300 06 0069 / 5233

ON E 68TH ST FROM S STONY ISLAND AVE TO S EAST END AVE

4.0

0 04/12/02

04/12/02

1,500

100

302 00 0092 / 5774

ON E 69TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE

3.0

01/21/02

01/23/02

0 01/29/02

01/29/02

618

100

300 03 0005 / 4876

ON E 69TH ST FROM S CREGIER AVE TO S JEFFERY BLVD

10.0

06/01/05

06/10/05

4,000 05/06/05

05/19/05

1,978

100

300 07 0005 / 5428

ON E 69TH ST FROM S DORCHESTER AVE TO S DANTE AVE

3.0

04/18/06

11/18/06

1,200 06/21/06

06/21/06

0

100

302 00 0092 / 5774

ON E 70TH PL FROM S PAXTON AVE TO S OGLESBY AVE

2.0

01/21/02

01/23/02

0 01/29/02

01/29/02

412

100

300 03 0005 / 4876

ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR

5.0

06/01/04

06/21/04

1,875 06/11/04

06/15/04

968

100

302 00 0092 / 5774

ON E 70TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE

3.0

01/21/02

01/23/02

0 01/29/02

01/29/02

618

100

300 03 0005 / 4876

ON E 70TH ST FROM S CRANDON AVE TO S SOUTH SHORE DR

6.0

06/18/04

06/21/04

2,250 06/11/04

06/15/04

1,161

100

300 03 0005 / 4876

ON E 70TH ST FROM S JEFFERY BLVD TO S SOUTH SHORE DR

10.0

06/01/05

06/10/05

4,000 05/06/05

05/19/05

1,978

100

300 06 0225 / 5340

ON E 70TH ST FROM S PAXTON AVE TO S CRANDON AVE

17.0

11/15/03

11/16/03

1,500 11/05/03

11/07/03

3,298

100

302 00 0092 / 5774

ON E 72ND ST FROM S JEFFERY BLVD TO S MERRILL AVE

8.0

05/09/03

05/09/03

3,200 05/06/03

05/06/03

3,000

100

300 06 0122 / 5275

ON E 73RD ST FROM S JEFFERY BLVD TO S MERRILL AVE

4.0

05/20/03

05/22/03

3,000 05/06/03

05/06/03

946

100

300 06 0225 / 5340

ON E 73RD ST FROM S UNIVERSITY AVE TO S BLACKSTONE AVE

17.0

11/15/03

11/17/03

6,375 11/05/03

11/07/03

3,298

100

300 03 0005 / 4876

ON S BENNETT AVE FROM E 72ND ST TO E 73RD ST

10.0

06/01/05

06/10/05

4,000 05/06/05

05/19/05

1,978

100

300 03 0005 / 4876

ON S BLACKSTONE AVE FROM E 67TH PL TO E 68TH ST

10.0

06/01/05

06/10/05

4,000 05/06/05

05/19/05

1,978

100

302 00 0092 / 5774

ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/28/02

01/28/02

4,120

100

302 00 0092 / 5774

ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST

15.0

02/04/02

02/04/02

3,150 02/01/02

02/01/02

3,045

100

302 00 0092 / 5774

ON S CHAPPEL AVE FROM E 73RD ST TO E 75TH ST

10.0

05/09/03

05/09/03

4,000 05/06/03

05/06/03

3,750

100

302 00 0092 / 5774

ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/28/02

01/28/02

4,120

100

302 00 0092 / 5774

ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST

16.0

02/04/02

02/04/02

3,360 02/01/02

02/01/02

3,248

100

300 05 0005 / 5120

ON S CORNELL AVE FROM E 53RD ST TO E 55TH ST

10.0

04/04/05

11/18/05

4,000 07/06/05

07/21/05

2,510

100

300 05 0005 / 5120

ON S CORNELL AVE FROM E 67TH ST TO E 69TH ST

10.0

04/04/05

11/18/05

4,000 07/06/05

07/21/05

2,510

100

300 09 / 33071

ON S CORNELL AVE FROM E 69TH ST TO E 71ST ST

6.0

05/13/08

05/16/08

2,400 05/13/08

05/16/08

1,534

100

300 03 0005 / 4876

ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST

5.0

06/01/05

06/10/05

2,000 05/06/05

05/19/05

989

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 61

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/28/02

01/28/02

4,120

100

302 00 0092 / 5774

ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST

17.0

02/04/02

02/04/02

3,570 02/01/02

02/01/02

3,451

100

300 06 0069 / 5233

ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST

11.0

11/01/03

11/03/03

4,368 03/21/03

03/21/03

2,408

100

302 00 0092 / 5774

ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST

9.0

03/24/03

03/24/03

3,600 03/21/03

03/21/03

3,375

100

300 06 0225 / 5340

ON S DANTE AVE FROM E 69TH ST TO E 68TH ST

4.0

11/15/03

11/15/03

1,500 11/05/03

11/07/03

776

100

300 05 0005 / 5120

ON S DORCHESTER AVE FROM E 75TH ST TO E 76TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

300 05 0005 / 5120

ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

300 03 0005 / 4876

ON S EUCLID AVE FROM E 71ST ST TO E 74TH ST

15.0

06/01/05

06/10/05

6,000 05/06/05

05/19/05

2,967

100

300 03 0005 / 4876

ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST

5.0

06/01/05

06/10/05

2,000 05/06/05

05/19/05

989

100

300 05 0005 / 5120

ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST

5.0

04/04/05

11/18/05

2,200 07/06/05

07/21/05

1,255

100

300 03 0005 / 4876

ON S HARPER AVE FROM E 68TH ST TO E 71ST ST

15.0

06/01/05

06/10/05

6,000 05/06/05

05/19/05

2,967

100

300 05 0005 / 5120

ON S KENWOOD AVE FROM E 75TH ST TO E 76TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

300 05 0005 / 5120

ON S KENWOOD AVE FROM E MARQUETTE RD TO E 67TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

300 05 0005 / 5120

ON S KIMBARK AVE FROM E MARQUETTE RD TO E 67TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

302 00 0092 / 5774

ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/28/02

01/28/02

4,120

100

302 00 0092 / 5774

ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST

16.0

02/04/02

02/04/02

3,360 02/01/02

02/01/02

3,248

100

300 05 0005 / 5120

ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

302 00 0092 / 5774

ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST

4.0

05/09/03

05/09/03

1,600 05/06/03

05/06/03

1,500

100

300 05 0005 / 5120

ON S OGLESBY AVE FROM E 67TH ST TO E 69TH ST

10.0

04/04/05

11/18/05

4,000 07/06/05

07/21/05

2,510

100

300 07 0005 / 5428

ON S OGLESBY AVE FROM E 69TH ST TO E 70TH ST

4.0

04/18/06

11/18/06

1,600 06/21/06

06/21/06

0

100

300 03 0005 / 4876

ON S OGLESBY AVE FROM E 69TH ST TO E 72ND ST

9.0

06/18/04

06/21/04

3,375 06/11/04

06/15/04

1,742

100

302 00 0092 / 5774

ON S OGLESBY AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/30/02

01/30/02

4,120

100

302 00 0092 / 5774

ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST

20.0

01/21/02

01/23/02

0 01/30/02

01/30/02

4,120

100

302 00 0092 / 5774

ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST

17.0

02/04/02

02/04/02

3,570 02/01/02

02/01/02

3,451

100

300 06 0069 / 5233

ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST

12.0

11/01/03

11/03/03

4,765 03/21/03

03/21/03

2,627

100

302 00 0092 / 5774

ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST

10.0

03/24/03

03/24/03

4,000 03/21/03

03/21/03

3,750

100

300 05 0005 / 5120

ON S WOODLAWN AVE FROM E 71ST ST TO E 73RD ST

10.0

04/04/05

11/18/05

4,000 07/06/05

07/21/05

2,510

100

300 05 0005 / 5120

S KIMBARK AVE AND E 75TH ST

5.0

04/04/05

11/18/05

2,000 07/06/05

07/21/05

1,255

100

302 00 0092 / 5774

1600 E 68TH ST

4.0

04/15/02

04/15/02

840 04/12/02

04/12/02

840

100

Totals per 250 Watt Changeout

566.0

150,158

124,486

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 62

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 06 0225 / 5340

ON E 67TH PL FROM S BLACKSTONE AVE TO S STONY ISLAND AVE

16.0

11/15/03

11/16/03

6,400 11/05/03

11/07/03

3,104

100

300 09 / 33071

ON S SHORE DR FROM E 53RD ST TO E 56TH ST

14.0

06/23/08

06/27/08

5,600 09/04/08

09/12/08

4,410

100

300 09 / 33071

ON S STONY ISLAND AVE FROM E 61ST ST TO E 62ND ST

7.0

10/24/08

10/27/08

2,800 10/24/08

10/27/08

1,875

100

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

37.0

14,800

9,389

Installations

300 06 0096 / 5258

1900 E 71ST ST

1,611.0

03/01/03

09/01/03

42,079 03/01/06

09/01/06

48,675

0

805 06 0991 / 7177

1437 E 72ND PL

1.0

06/09/95

06/09/95

0 06/09/95

06/09/95

300

100

805 06 1858 / 8044

6907 S CRANDON AVE

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

805 06 1839 / 8025

6927 S CRANDON AVE

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

805 06 1820 / 8006

6949 S CRANDON AVE

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

805 06 1693 / 7879

6957 S CRANDON AVE

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

600

100

805 06 0415 / 6601

5216 S DREXEL AVE

1.0

05/23/95

05/23/95

0 05/23/95

05/23/95

300

100

805 06 2085 / 8271

5228 S DREXEL AVE

1.0

05/23/95

05/23/95

0 05/23/95

05/23/95

300

100

805 06 1994 / 8180

5232 S DREXEL AVE

1.0

05/23/95

05/23/95

0 05/23/95

05/23/95

300

100

805 06 1865 / 8051

5240 S DREXEL AVE

1.0

05/23/95

05/23/95

0 05/23/95

05/23/95

300

100

805 06 0552 / 6738

7251 S EUCLID AVE

1.0

05/09/95

05/09/95

0 05/09/95

05/09/95

300

100

805 06 2066 / 8252

5605 S KIMBARK AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 2068 / 8254

5631 S KIMBARK AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 2069 / 8255

5647 S KIMBARK AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 2070 / 8256

5700 S KIMBARK AVE

1.0

04/12/96

04/12/96

0 04/12/96

04/12/96

300

100

805 06 1835 / 8021

5317 S MARYLAND AVE

1.0

01/11/95

01/11/95

0 01/11/95

01/11/95

300

100

805 06 1742 / 7928

7500 S MERRILL AVE

1.0

05/16/97

05/16/97

0 05/16/97

05/16/97

300

100

805 06 0467 / 6653

7010 S WOODLAWN AVE

1.0

10/05/95

10/05/95

0 10/05/95

10/05/95

300

100

805 06 1002 / 7188

1140 W 75TH ST

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

1900 E 71ST ST

Totals per Lighting/Electrical

1,629.0

42,079

54,375

Lamps 2,175.0

06/01/07

12/31/07

64,032 11/06/07 1,248,972

11/14/07

62,096 1,451,027

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 63

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1900 E 71ST ST

Work Type: Flood Light Install

Installations 2,080.0

0 07/18/02

07/21/02

37,873

100

Fixtures

300 03 0005 / 4876

2132 E 72ND ST

4.0

09/01/04

09/04/04

2,000 09/01/04

09/01/04

1,600

100

300 03 0005 / 4876

6900 S DORCHESTER AVE

1.0

09/01/01

09/04/04

500 09/01/04

09/01/04

400

100

300 03 0005 / 4876

7401 S MERRILL AVE

1.0

09/01/04

09/04/04

500 09/01/04

09/01/04

400

100

300 03 0005 / 4876

7000 S OGLESBY AVE

1.0

09/01/04

09/04/04

500 09/01/04

09/01/04

400

100

300 03 0005 / 4876

7100 S OGLESBY AVE

1.0

09/01/04

09/04/04

500 09/01/04

09/01/04

400

100

300 06 0071 / 5234

7059 S SOUTH SHORE DR

01/01/00

12/30/00

0 09/11/00

09/13/00

6,750

100

300 09 / 33071

6230 S STONY ISLAND AVE

1.0

10/27/08

10/27/08

500 10/27/08

10/27/08

335

100

300 09 / 33071

6240 S STONY ISLAND AVE

1.0

10/27/08

10/27/08

500 10/27/08

10/27/08

335

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

10.0

.0

Work Type: Lighting Imprvmnts

Installations

01/01/08

12/31/08

300 06 0292 / 5399

S DREXEL AVE AND S SOUTH CHICAGO AVE

281 00 / 33670

1008-1010 E 59TH ST

.0

01/01/08

12/31/08

300 06 0292 / 5399

1532 E 76TH ST

.0

03/01/05

12/31/05

Work Type: Lighting Imprvmnts 300 06 0282 / 5390

S DREXEL AVE AND S SOUTH CHICAGO AVE

Work Type: Loop Lighting 281 00 / 33670

1008-1010 E 59TH ST

Work Type: Ornamental - Piggyback Lighting 300 09 / 33071

ON S SHORE DR FROM E 53RD ST TO E 56TH ST

Work Type: Ornamental Lighting 281 00 / 33670

1008-1010 E 59TH ST

10,620

0

0

0

30,133

100

Blocks

1008-1010 E 59TH ST

Totals per Lighting Imprvmnts

5,000

1.0

30,570 05/23/05

1.0

07/06/05

0 50,000 03/01/05

09/07/05

80,570

0

0

34,431

100

64,564

Projects .0

10/06/04

10/31/04

0 06/01/05

01/01/08

12/31/08

0

08/28/08

09/12/08

01/01/08

12/31/08

06/28/07

30,132

100

0

0

29,066

100

0

0

Blocks .0

Fixtures 32.0

43,800 09/04/08

09/12/08

Blocks .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 64

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670

1008-1010 E 59TH ST

Work Type: Residential Regrouping 300 06 0270 / 5378

1900 E 71ST ST

Work Type: Residntl Staggered Lighting

Poles .0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

05/04/08

12/31/08

0

0

0

135,000

0

0

Lamps .0

Blocks

300 06 / 32277

ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE

300 09 / 33071

ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR

2.0

300 11 / 32194

ON E 73RD ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE

2.0

04/01/08

06/02/08

125,000 11/02/07

03/14/08

86,054

100

300 07 0004 / 5427

waiting for restoration Note Last Updated on 07-FEB-08 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST

.50

07/17/06

09/08/06

21,250 09/01/06

11/27/06

0

100

300 07 0005 / 5428

ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST

.50

04/01/07

06/01/07

21,250 09/01/06

11/27/06

0

100

300 09 / 33070

ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST

.50

32,500 04/01/08

12/01/08

0

0

300 09 / 33071

ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST

.50

32,500

0

0

300 09 / 33071

ON S EVERETT AVE FROM E 55TH ST TO E 56TH ST

1.0

65,000

0

0

7.0

432,500

86,054

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

.0

Blocks

300 06 0267 / 5375

ON S DOBSON AVE FROM E 71ST ST TO E 73RD ST

2.0

06/20/04

08/20/04

155,485 05/19/04

09/16/04

139,095

100

300 06 0235 / 5349

ON S WOODLAWN AVE FROM E 71ST ST TO E 69TH ST

2.0

05/02/03

07/02/03

153,524 05/02/03

06/06/03

153,912

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

1008-1010 E 59TH ST

Work Type: Short Arm Installs - Residntl 281 00 / 33670

1008-1010 E 59TH ST

4.0

309,009

293,007

Locations .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

Locations .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 65

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 04 0216 / 5114

ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE

14.50

05/01/06

11/01/06

3,100 05/17/06

09/09/06

3,100

100

300 06 0108 / 5263

ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE

70.0

05/11/03

05/31/03

17,000 07/01/03

07/28/03

16,870

100

300 06 0108 / 5263

ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST

79.0

05/20/03

06/03/03

18,500 07/01/03

07/28/03

18,480

100

300 09 / 33071

ON S SHORE DR FROM E 53RD ST TO E 56TH ST

14.0

06/23/08

06/27/08

4,200 06/23/08

06/27/08

2,800

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

1008-1010 E 59TH ST

Work Type: Strt Lighting 300 06 0275 / 5383

ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

1900 E 71ST ST

177.50

42,800

41,250

0

0

0

Blocks .0

01/01/08

12/31/08

04/21/06

07/18/06

40,000 04/21/06

07/18/06

37,456

100

03/01/04

12/01/04

11,352 07/31/06

08/25/06

23,773

100

Blocks .50

Lamps 2,183.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 66

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2634 / 8820

1601 E 55TH ST

302 00 0071 / 5759

1540 E 56TH ST

805 06 2527 / 8713

1538 E 57TH BLVD

302 00 0071 / 5759

Fixtures 22.0

0 01/23/92

01/23/92

16,500

100

0 08/01/98

08/06/98

20,171

100

0 01/23/92

01/23/92

16,500

100

1530 E 57TH ST

0 08/09/98

08/12/98

21,965

100

302 00 0070 / 5758

1500 E 59TH ST

0 07/15/97

07/22/97

17,507

100

805 06 2157 / 8343

1500 E 59TH ST

38.0

07/22/97

07/22/97

0 07/22/97

07/22/97

28,500

100

805 06 2199 / 8385

1500 E 59TH ST

30.0

01/23/92

01/23/92

0 01/23/92

01/23/92

22,500

100

302 00 0070 / 5758

1500 E 60TH ST

0 08/20/97

08/27/97

14,520

100

805 06 2128 / 8314

1500 E 60TH ST

20.0

08/27/97

08/27/97

0 08/27/97

08/27/97

15,000

100

805 06 2833 / 9019

1405 E 67TH ST

20.0

04/13/93

04/13/93

0 04/13/93

04/13/93

15,000

100

805 06 2622 / 8808

1305 E 70TH ST

34.0

01/30/95

01/30/95

0 01/30/95

01/30/95

25,500

100

805 06 2418 / 8604

1285 E 71ST ST

26.0

04/20/94

04/20/94

0 04/20/94

04/20/94

19,500

100

300 06 0099 / 5260

1900 E 71ST ST

229.0

07/28/03

07/30/03

12,872 07/28/03

07/30/03

7,232

100

805 06 2477 / 8663

1205 E 72ND ST

16.0

01/11/94

01/11/94

0 01/11/94

01/11/94

12,000

100

805 06 2446 / 8632

1205 E 73RD ST

22.0

12/27/93

12/27/93

0 12/27/93

12/27/93

16,500

100

805 06 2345 / 8531

1199 E 75TH ST

8.0

05/16/96

05/16/96

0 05/16/96

05/16/96

6,000

100

805 06 2342 / 8528

1200 E 75TH ST

27.0

03/26/96

03/26/96

0 03/26/96

03/26/96

20,250

100

302 00 0070 / 5758

1230 E 76TH ST

0 02/03/97

02/10/97

16,940

100

302 00 0070 / 5758

1240 E 76TH ST

0 02/03/97

02/10/97

10,400

100

302 00 0070 / 5758

1250 E 76TH ST

0 01/17/97

01/23/97

10,100

100

805 06 2180 / 8366

1436 E MIDWAY PLAISANCE

0 12/31/95

12/31/95

9,000

100

302 00 0070 / 5758

1500 E MIDWAY PLAISANCE

0 07/21/97

07/28/97

6,460

100

805 06 2121 / 8307

1500 E MIDWAY PLAISANCE

20.0

07/28/97

07/28/97

0 07/28/97

07/28/97

15,000

100

805 06 2184 / 8370

1500 E MIDWAY PLAISANCE

12.0

12/31/95

12/31/95

0 12/31/95

12/31/95

9,000

100

302 00 0070 / 5758

1510 E MIDWAY PLAISANCE

0 07/31/97

08/11/97

15,626

100

805 06 2122 / 8308

1510 E MIDWAY PLAISANCE

28.0

08/11/97

08/11/97

0 08/11/97

08/11/97

21,000

100

805 06 2610 / 8796

7605 S AVALON AVE

26.0

12/31/91

12/31/91

0 12/31/91

12/31/91

19,500

100

805 06 2464 / 8650

7105 S COTTAGE GROVE AVE

22.0

01/24/96

01/24/96

0 01/24/96

01/24/96

16,500

100

805 06 2396 / 8582

7189 S COTTAGE GROVE AVE

18.0

01/24/96

01/24/96

0 01/24/96

01/24/96

13,500

100

302 00 0070 / 5758

7720 S DANTE AVE

0 01/22/97

01/29/97

7,503

100

302 00 0070 / 5758

7730 S DANTE AVE

0 01/22/97

01/28/97

1,164

100

22.0

12.0

01/23/92

01/23/92

12/31/95

01/23/92

01/23/92

12/31/95

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 67

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0070 / 5758

7740 S DANTE AVE

805 06 2114 / 8300

7340 S GREENWOOD AVE

302 00 0070 / 5758

7420 S GREENWOOD AVE

805 06 2115 / 8301

7420 S GREENWOOD AVE

302 00 0070 / 5758

Fixtures 0 01/28/97

02/04/97

4,506

100

0 09/01/97

09/01/97

7,500

100

0 10/13/97

10/20/97

4,290

100

0 10/20/97

10/20/97

6,750

100

7430 S GREENWOOD AVE

0 09/10/97

09/17/97

5,818

100

302 00 0070 / 5758

7440 S GREENWOOD AVE

0 09/07/97

09/12/97

15,184

100

805 06 2113 / 8299

7440 S GREENWOOD AVE

16.0

09/12/97

09/12/97

0 09/12/97

09/12/97

12,000

100

805 06 2232 / 8418

7500 S SOUTH CHICAGO AVE

32.0

12/09/96

12/09/96

0 12/09/96

12/09/96

24,000

100

Totals per Underpass Lighting

10.0

9.0

719.0

09/01/97

10/20/97

09/01/97

10/20/97

12,872

546,886

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 68

1/1/2008 AND 12/31/2008

Ward 05 Leslie Hairston CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 300 05 0005 / 5120

E 71ST ST AND S COTTAGE GROVE AVE

210 06 0171 / 4420

E MARQUETTE RD AND S STONY ISLAND AVE

210 06 0072 / 4336

6700 S STONY ISLAND AVE

Totals per Left Turn Arrow

Work Type: New Signal

Locations .50

10/15/06

12/15/06

30,000

.0

03/01/07

12/31/07

0

1.0

01/08/01

02/08/01

1.50

.0

01/28/07

07/28/07

210 06 0171 / 4420

E MARQUETTE RD AND S STONY ISLAND AVE

.0

03/01/07

12/31/07

300 06 0197 / 5322

.0

S LAKE PARK AVE AND E 55TH ST

Work Type: Signals 300 06 0096 / 5258

1900 E 71ST ST

Work Type: TSM Install

0

0

10,986

100

10,986

Locations

E MARQUETTE DR AND S RICHARDS DR

Work Type: Removal Temp Wiring - Signals

01/17/01

45,000

210 06 / 32040

Totals per New Signal

15,000 01/10/01

0

67,000 03/13/07

05/07/07

56,011

100

0

0

0

67,000

56,011

Crossings 1.50

6,000 04/08/02

04/08/02

0

100

9,329

100

100

Intersections 59.0

07/15/03

07/18/03

0 07/15/06

07/20/06

04/16/93

04/16/93

0 04/16/93

04/16/93

72,118

0 12/02/98

01/25/99

165,315

Locations

814 06 0137 / 16351

7500 S DORCHESTER AVE

1.0

271 00 0040 / 4789

7100 S JEFFERY AVE

1.0

814 06 0104 / 16319

7130 S JEFFERY BLVD

1.0

05/14/90

05/14/90

0 05/14/90

05/14/90

88,894

100

814 06 0133 / 16347

7300 S JEFFERY BLVD

1.0

02/10/94

02/10/94

0 02/10/94

02/10/94

109,097

100

814 06 0061 / 16277

5900 S STONY ISLAND AVE

1.0

02/23/96

02/23/96

0 02/23/96

02/23/96

318,966

100

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 09 / 33071

ON S SHORE DR FROM E 53RD ST TO E 56TH ST

Totals per Traffic

0

754,390

Locations 2.0

06/23/08

06/27/08

400 06/23/08

06/27/08

239

118,400

830,955

Totals per Construction Phase

1,367,372

2,281,982

Totals for Ward 05

1,639,372

2,290,471

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 69

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,266

100

210 06 0243 / 4480

E 83RD ST AND S COTTAGE GROVE AVE

.0

10/15/06

11/15/06

500 10/15/06

06/07/06

1,500

100

210 06 0243 / 4480

E 95TH ST AND S MICHIGAN AVE

.0

12/27/06

01/26/07

500 12/27/06

01/26/07

1,912

100

300 06 0292 / 5399

7636 S COTTAGE GROVE AVE

1.0

06/06/05

07/11/05

1,500 06/06/05

07/11/05

0

100

Totals per Design/Engineering

1.0

2,500

5,678

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 70

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST

21.0

0 09/26/01

09/26/01

4,322

100

302 00 0092 / 5774

ON S CHAMPLAIN AVE FROM E 71ST ST TO E 75TH ST

17.0

0 09/27/01

09/27/01

3,499

100

302 00 0092 / 5774

ON S ST LAWRENCE AVE FROM E 71ST ST TO E 75TH ST

17.0

0 09/26/01

09/26/01

3,499

100

300 06 0069 / 5233

8200 S COTTAGE GROVE AVE

300 06 / 32495

09/29/01

09/29/01

4.0

02/16/03

02/16/03

1,600 02/13/03

02/13/03

1,000

100

7600-7800 S INDIANA AVE

11.0

08/01/07

08/15/07

2,200 08/18/07

08/18/07

2,200

100

300 06 / 32495

7600-7800 S MICHIGAN AVE

11.0

04/01/07

05/15/07

2,200 08/18/07

08/18/07

2,200

100

302 00 0092 / 5774

8201 S WABASH AVE

1.0

02/03/01

02/03/01

203 01/31/01

01/31/01

210

100

302 00 0092 / 5774

8205 S WABASH AVE

1.0

02/03/01

02/03/01

203 01/31/01

01/31/01

210

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

83.0

6,406

17,140

Fixtures

300 09 / 33072

ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE

300 06 0122 / 5275

ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST

300 05 0006 / 5121

ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST

60.0

04/04/05

11/18/05

24,000 08/10/05

08/20/05

21,000

100

300 07 0006 / 5429

ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST

192.0

10/10/06

11/10/06

76,800 10/10/06

11/01/06

0

100

300 11 / 32195

8700-9900 S DR MARTIN LUTHER KING JR DR

105.0

12/01/07

12/31/07

43,000 09/26/07

02/14/08

26,031

100

300 05 0006 / 5121

Totals per 400 Watt Changeout Totals per Lighting/Electrical

46.0

04/04/05

11/18/05

18,400 08/10/05

08/20/05

16,100

100

63.0

05/12/08

07/11/08

25,200 05/12/08

05/23/08

19,845

100

6.0

05/09/03

05/09/03

2,400 05/06/03

05/06/03

2,250

100

472.0

189,800

85,226

1,547,479

1,333,025

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 71

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0983 / 7169

612 E 71ST ST

1.0

03/28/95

03/28/95

0 03/28/95

03/28/95

300

300 06 0096 / 5258

406 E 75TH ST

1,870.0

03/01/03

09/01/03

48,844 03/01/06

09/01/06

56,500

0

302 00 0092 / 5774

406 E 75TH ST

26.0

0 02/27/01

01/30/02

6,127

100

805 06 1011 / 7197

705 E 75TH ST

1.0

03/07/95

03/07/95

0 03/07/95

03/07/95

300

100

805 06 0866 / 7052

25 E 79TH ST

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

302 00 0092 / 5774

125 E 87TH ST

1.0

0 11/06/01

11/06/01

236

100

805 06 0756 / 6942

319 E 91ST ST

1.0

03/22/95

03/22/95

0 03/22/95

03/22/95

300

100

805 06 0757 / 6943

319 E 91ST ST

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

805 06 0758 / 6944

327 E 91ST ST

1.0

09/20/96

09/20/96

0 09/20/96

09/20/96

300

100

302 00 0092 / 5774

7536 S CALUMET AVE

1.0

0 03/02/01

03/02/01

236

100

805 06 0806 / 6992

8520 S CALUMET AVE

1.0

03/22/95

03/22/95

0 03/22/95

03/22/95

300

100

805 06 0808 / 6994

8520 S CALUMET AVE

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

805 06 0625 / 6811

7516 S EVANS AVE

1.0

03/07/95

03/07/95

0 03/07/95

03/07/95

300

100

805 06 0606 / 6792

7522 S EVANS AVE

1.0

03/07/95

03/07/95

0 03/07/95

03/07/95

300

100

805 06 1748 / 7934

7529 S EVANS AVE

1.0

05/21/97

05/21/97

0 05/21/97

05/21/97

300

100

805 06 1099 / 7285

6933 S GREEN ST

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 1746 / 7932

7445 S INDIANA AVE

1.0

05/21/97

05/21/97

0 05/21/97

05/21/97

300

100

805 06 1527 / 7713

7851 S INDIANA AVE

1.0

11/06/97

11/06/97

0 11/06/97

11/06/97

300

100

805 06 1625 / 7811

9416 S MICHIGAN AVE

1.0

09/12/97

09/12/97

0 09/12/97

09/12/97

300

100

805 06 0612 / 6798

6710 S PARNELL AVE

1.0

10/27/95

10/27/95

0 10/27/95

10/27/95

300

100

805 06 0613 / 6799

6740 S PARNELL AVE

1.0

10/27/95

10/27/95

0 10/27/95

10/27/95

300

100

805 06 0614 / 6800

6748 S PARNELL AVE

1.0

10/27/95

10/27/95

0 10/27/95

10/27/95

300

100

805 06 1684 / 7870

7030 S PERRY AVE

1.0

06/25/97

06/25/97

0 06/25/97

06/25/97

300

100

805 06 0554 / 6740

7042 S PERRY AVE

1.0

12/04/95

12/04/95

0 12/04/95

12/04/95

300

100

805 06 0551 / 6737

7102 S PRAIRIE AVE

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

805 06 0559 / 6745

7102 S PRAIRIE AVE

1.0

03/22/95

03/22/95

0 03/22/95

03/22/95

300

100

302 00 0092 / 5774

7158 S STATE ST

1.0

0 04/04/01

04/04/01

236

100

805 06 1794 / 7980

8237 S WABASH AVE

1.0

0 03/28/97

03/28/97

300

100

Totals per Alley Lighting/Lamps

1,922.0

03/28/97

03/28/97

48,844

70,235

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 72

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

406 E 75TH ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2,105.0

2,010.0

61,971 12/03/07

01/28/08

60,097

100

0 09/01/02

09/08/02

36,598

100

0 12/06/99

12/06/99

1,405

100

17,700

70

10,993

100

Fixtures

331 E 71ST ST

Work Type: Lighting Imprvmnts

12/31/07

Installations

406 E 75TH ST

Work Type: Flood Light Install 300 06 0167 / 5306

06/01/07

4.0

Installations

300 06 0256 / 5366

ON W 71ST ST FROM S PRINCETON AVE TO S WENTWORTH AVE

300 06 0292 / 5399

Traffic corner being redisgned; 08/22/07 Note Last Updated on 22-AUG-07 7636 S COTTAGE GROVE AVE

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

11.0

08/01/04

12/31/07

17,700 07/17/06

.0

09/30/05

10/30/05

14,306 09/29/05

11.0

11/29/05

32,006

28,693

Fixtures

300 09 / 33072

ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE

300 05 0006 / 5121

MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST

52.0

04/04/05

11/18/05

70,200 08/10/05

01/23/06

60,397

100

300 07 0006 / 5429

ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST

159.0

10/10/06

11/10/06

214,650 10/10/06

12/17/06

0

100

300 11 / 32195

8700-9900 S DR MARTIN LUTHER KING JR DR

93.0

12/01/07

12/31/07

125,500 09/26/07

02/14/08

88,143

100

300 05 0006 / 5121

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

406 E 75TH ST

Work Type: Residntl Staggered Lighting 300 06 0308 / 5414

ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE

34.0

04/04/05

11/18/05

45,900 08/10/05

01/19/06

36,226

100

56.0

06/30/08

07/31/08

75,600 08/11/08

09/02/08

56,016

100

394.0

531,850

240,782

0

0

0

115,994

100

Lamps .0

03/01/08

12/01/08

03/16/06

12/31/06

Blocks 2.0

165,753 06/05/06

08/07/06

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 73

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 06 0267 / 5375

ON S FOREST AVE FROM E 95TH ST TO E 96TH ST

2.0

10/01/04

12/30/04

154,373 09/17/04

01/07/05

151,823

100

300 06 0235 / 5349

ON S LANGLEY AVE FROM E 81ST ST TO E 79TH ST

2.0

07/25/03

09/25/03

169,794 07/22/03

10/20/03

178,233

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

7100 S STATE ST

Work Type: Strt Light Pole Painting

4.0

324,167

330,056

Locations 7.0

0 04/06/01

04/06/01

2,647

100

Locations 34.0

04/04/05

11/18/05

8,500 08/10/05

08/20/05

7,354

100

300 09 / 33072

ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE

63.0

05/12/08

07/11/08

18,900 05/02/08

05/12/08

12,600

100

300 04 0216 / 5114

ON E 95TH ST FROM S MICHIGAN AVE TO S STATE ST

14.0

05/01/06

11/01/06

3,028 05/17/06

06/04/06

3,028

100

300 05 0006 / 5121

ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST

52.0

04/04/05

11/18/05

13,000 08/10/05

08/20/05

9,517

100

300 07 0006 / 5429

ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST

172.0

07/17/06

09/30/06

43,000 07/01/06

07/24/06

43,000

100

302 00 0076 / 5764

ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE

2.46

06/27/98

06/30/98

0 06/27/98

06/30/98

42

100

300 11 / 32195

8700-9900 S DR MARTIN LUTHER KING JR DR

136.0

07/10/07

12/31/07

29,550 07/10/07

08/05/07

29,550

100

300 06 / 32495

7600-7800 S INDIANA AVE

11.0

04/01/07

05/15/07

1,200 03/30/07

04/03/07

1,200

100

300 06 / 32495

7600-7800 S MICHIGAN AVE

11.0

04/01/07

05/15/07

1,200 03/29/07

04/03/07

1,200

100

300 05 0006 / 5121

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

495.46

118,378

107,491

Blocks

300 06 0204 / 5327

ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST

18.0

10/02/01

10/02/01

3,780 09/27/01

09/27/01

3,780

100

300 06 0204 / 5327

ON S CHAMPLAIN AVE FROM E 71ST ST TO E 74TH ST

17.0

10/03/01

10/03/01

3,570 09/26/01

09/26/01

3,570

100

300 06 0204 / 5327

ON S ST LAWRENCE AVE FROM E 71ST ST TO E 74TH ST

17.0

10/06/01

10/06/01

3,570 09/27/01

09/27/01

3,520

100

300 06 0204 / 5327

7300 S MICHIGAN AVE

4.0

10/02/01

10/02/01

840 09/29/01

09/29/01

840

100

56.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

406 E 75TH ST

11,760

11,710

Lamps 2,918.0

03/01/04

12/01/04

15,174 07/31/06

08/17/06

31,777

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 74

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2341 / 8527

720 E 71ST ST

20.0

03/22/96

03/22/96

0 03/22/96

03/22/96

15,000

100

805 06 2233 / 8419

798 E 71ST ST

17.0

03/22/96

03/22/96

0 03/22/96

03/22/96

12,750

100

300 06 0099 / 5260

406 E 75TH ST

736.0

07/31/03

08/11/03

41,370 07/31/03

08/07/03

28,594

100

805 06 2266 / 8452

9101 S DR MARTIN LUTHER KING JR DR

34.0

08/30/96

08/30/96

0 08/30/96

08/30/96

25,500

100

805 06 2430 / 8616

9001 S INDIANA AVE

22.0

02/25/94

02/25/94

0 02/25/94

02/25/94

16,500

100

805 06 2431 / 8617

6895 S KEEFE AVE

17.0

01/08/96

01/08/96

0 01/08/96

01/08/96

12,750

100

805 06 2434 / 8620

6895 S KEEFE AVE

13.0

01/08/96

01/08/96

0 01/08/96

01/08/96

9,750

100

805 06 2432 / 8618

6905 S ST LAWRENCE AVE

14.0

04/14/94

04/14/94

0 04/14/94

04/14/94

10,500

100

805 06 2433 / 8619

6906 S ST LAWRENCE AVE

22.0

04/14/94

04/14/94

0 04/14/94

04/14/94

16,500

100

805 06 2240 / 8426

205 W 66TH ST

8.0

04/29/93

04/29/93

0 04/29/93

04/29/93

6,000

100

805 06 2602 / 8788

395 W 71ST ST

12.0

02/14/95

02/14/95

0 02/14/95

02/14/95

9,000

100

302 00 0070 / 5758

600 W 71ST ST

0 07/15/97

07/22/97

6,330

100

805 06 2322 / 8508

726 W 83RD ST

18.0

03/12/93

03/12/93

0 03/12/93

03/12/93

13,500

100

805 06 2947 / 9133

331 W 88TH ST

6.0

12/21/93

12/21/93

0 12/21/93

12/21/93

4,500

100

805 06 2343 / 8529

245 W MARQUETTE RD

8.0

05/04/93

05/04/93

0 05/04/93

05/04/93

6,000

100

Totals per Underpass Lighting

947.0

41,370

193,174

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 75

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S COTTAGE GROVE AVE AND E 85TH ST

.50

5,282 04/19/05

04/19/05

2,910

100

210 06 0130 / 4389

S COTTAGE GROVE AVE AND E 86TH ST

.50

0 10/04/02

10/04/02

925

100

210 06 0130 / 4389

S DR MARTIN LUTHER KING JR DR AND E 75TH ST

1.0

0 09/27/01

09/27/01

8,539

100

210 06 0130 / 4389

S INDIANA AVE AND E 69TH ST

.50

0 05/21/02

05/21/02

3,662

100

210 06 0130 / 4389

S SOUTH CHICAGO AVE AND S KEEFE AVE

.50

0 04/30/02

04/30/02

925

100

210 06 / 32276

W 75TH ST AND S STATE ST

16,768 05/01/08

05/31/08

13,106

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

.0

04/24/05

04/01/07

04/24/05

02/28/08

3.0

22,050

30,067

Locations

300 05 0005 / 5120

E 71ST ST AND S COTTAGE GROVE AVE

.50

10/15/06

12/15/06

30,000

0

300 06 / 32754

E 87TH ST AND S DR MARTIN LUTHER KING JR DR

1.0

11/01/08

01/31/09

47,000

0

77,000

0

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0164 / 4415

E 86TH ST AND S COTTAGE GROVE AVE

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

E 83RD ST AND S COTTAGE GROVE AVE

210 06 0243 / 4480

E 95TH ST AND S MICHIGAN AVE

Totals per Pedestrian Countdown Signal Install

1.50

Locations 08/15/02

10/01/02

86,635 08/15/02

10/09/02

78,583

100

.10

04/01/06

05/08/07

12,000 04/01/06

01/11/07

5,773

100

.0

03/15/06

05/08/07

12,000 01/15/07

02/15/07

5,661

100

.50

Locations

.10

Work Type: Removal Temp Wiring - Signals

Crossings

S ST LAWRENCE AVE AND E 75TH ST

1.0

300 06 0197 / 5322

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

406 E 75TH ST

0

24,000

11,434

4,000 05/02/01

05/21/01

8,428

100

0 07/20/06

10/02/06

8,222

100

Intersections 52.0

07/21/03

07/25/03

426,327

1,342,161

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 76

1/1/2008 AND 12/31/2008

Ward 06 Freddrenna Lyle CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0163 / 4414

E 87TH ST AND S COTTAGE GROVE AVE

.50

10/01/02

10/15/02

31,843 10/08/02

12/16/02

30,190

100

814 06 0176 / 16388

8100 S COTTAGE GROVE AVE

1.0

07/09/93

07/09/93

0 07/09/93

07/09/93

115,000

100

814 06 0174 / 16386

8200 S COTTAGE GROVE AVE

1.0

07/09/93

07/09/93

0 07/09/93

07/09/93

115,000

100

814 06 0175 / 16387

8300 S COTTAGE GROVE AVE

1.0

07/09/93

07/09/93

0 07/09/93

07/09/93

115,000

100

814 06 0311 / 16523

7100 S DR MARTIN LUTHER KING JR DR

1.0

01/02/89

01/02/89

0 01/02/89

01/02/89

84,162

100

814 06 0206 / 16418

8700 S DR MARTIN LUTHER KING JR DR

1.0

03/15/94

03/15/94

0 03/15/94

03/15/94

120,000

100

814 06 0062 / 16278

9700 S DR MARTIN LUTHER KING JR DR

1.0

06/07/96

06/07/96

0 06/07/96

06/07/96

108,744

100

210 06 0068 / 4332

9932 S DR MARTIN LUTHER KING JR DR

1.0

06/01/99

12/01/99

157,500 07/20/99

01/20/00

69,876

100

814 06 0208 / 16420

8700 S INDIANA AVE

1.0

03/15/94

03/15/94

0 03/15/94

03/15/94

120,000

100

814 06 0130 / 16344

7100 S LAFAYETTE AVE

1.0

04/01/93

04/01/93

0 04/01/93

04/01/93

91,815

100

814 06 0207 / 16419

8700 S ST LAWRENCE AVE

1.0

04/05/94

04/05/94

0 04/05/94

04/05/94

120,000

100

814 06 0156 / 16370

7100 S STATE ST

1.0

04/02/93

04/02/93

0 04/02/93

04/02/93

100,651

100

11.50

Totals per TSM Install

Work Type: Traffic Equipment Painting

189,343

Locations 12.0

04/04/05

11/18/05

300 09 / 33072

ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE

2.0

05/12/08

300 05 0006 / 5121

ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST

12.0

04/04/05

300 07 0006 / 5429

ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST

44.0

07/17/06

300 05 0006 / 5121

1,190,438

70.0

4,200 08/10/05

08/20/05

6,489

100

07/11/08

400 05/02/08

11/18/05

4,200 08/10/05

05/12/08

239

100

08/20/05

4,903

09/30/06

14,500 07/01/06

100

07/24/06

3,359

100

23,300

14,990

Totals per Construction Phase

1,973,806

2,675,185

Totals for Ward 06

1,976,306

2,680,863

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 77

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

210 06 0158 / 5058

E 95TH ST AND S PAXTON AVE

.0

08/15/05

12/31/05

0 08/15/05

281 00 / 33670

2565-2567 E 72ND PL

.0

01/01/08

12/31/08

0

300 06 0292 / 5399

1847 E 95TH ST

1.0

06/29/05

300 06 0292 / 5399

7615 S MARQUETTE RD

1.0

300 06 0251 / 5361

9141 S SOUTH CHICAGO AVE

.0

04/01/07

12/31/05

1,000 06/29/05

08/08/07

2,326

100

0

0

0

1,000 03/30/05

05/09/05

0

100

420 09/25/07

09/25/07

0

100

10/31/06 email from CDOT to remodify existing . No further information on this project. Note Last Updated on 26-FEB-07 Totals per Design/Engineering

2.0

2,420

2,326

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 78

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 09 / 33076

ON S MUSKEGON AVE FROM E 87TH ST TO E 89TH ST

Work Type: 400 Watt Changeout

Fixtures 10.0

10/24/08

10/24/08

4,000 10/24/08

10/24/08

3,487

100

Fixtures

300 09 / 33073

ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

47.0

05/05/08

06/27/08

18,800 05/05/08

06/27/08

16,997

100

300 11 / 32196

ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

82.0

01/04/08

03/11/08

33,600 01/04/08

03/11/08

19,582

100

300 11 / 32196

7113-7900 S EXCHANGE AVE

100.0

03/01/07

12/31/07

0 09/11/07

09/25/07

0

0

300 06 0069 / 5233

9500 S JEFFERY AVE

9.0

10/14/02

10/14/02

3,600 10/11/02

10/11/02

3,375

100

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

238.0

56,000

39,954

Installations

300 06 0096 / 5258

2552 E 79TH ST

1,116.0

302 00 0092 / 5774

2552 E 79TH ST

11.0

0 03/01/06

09/01/06

33,719

0

0 03/23/01

01/10/02

2,592

100

805 06 1674 / 7860

9911 S CLYDE AVE

1.0

08/10/95

805 06 1575 / 7761

7859 S COLES AVE

1.0

03/13/95

08/10/95

0 08/10/95

08/10/95

300

100

03/13/95

0 03/13/95

03/13/95

300

805 06 1812 / 7998

7535 S CRANDON AVE

1.0

100

02/16/95

02/16/95

0 02/16/95

02/16/95

300

805 06 1903 / 8089

7816 S CRANDON AVE

100

1.0

07/31/96

07/31/96

0 07/31/96

07/31/96

300

805 06 0598 / 6784

100

7727 S EXCHANGE AVE

1.0

02/16/95

02/16/95

0 02/16/95

02/16/95

300

100

805 06 2045 / 8231

8418 S KINGSTON AVE

1.0

09/29/95

09/29/95

0 09/29/95

09/29/95

300

100

805 06 2046 / 8232

8439 S KINGSTON AVE

1.0

10/13/95

10/13/95

0 10/13/95

10/13/95

300

100

805 06 1515 / 7701

7622 S LUELLA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1486 / 7672

7640 S LUELLA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1855 / 8041

7700 S LUELLA AVE

1.0

06/12/96

06/12/96

0 06/12/96

06/12/96

300

100

805 06 1487 / 7673

7716 S LUELLA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1488 / 7674

7740 S LUELLA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 0571 / 6757

7935 S OGLESBY AVE

1.0

08/01/95

08/01/95

0 08/01/95

08/01/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

2552 E 79TH ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2552 E 79TH ST

03/01/03

09/01/03

1,140.0

0

40,211

Lamps 1,004.0

06/01/07

12/31/07

29,557 11/08/07

02/04/08

28,664

100

0 09/07/02

09/12/02

16,551

100

Installations 909.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 79

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

302 00 0092 / 5774

2629 E 91ST ST

1.0

0 07/03/01

07/03/01

471

100

302 00 0092 / 5774

2653 E 91ST ST

2.0

0 07/10/01

07/10/01

942

100

302 00 0092 / 5774

2705 E 91ST ST

1.0

0 07/10/01

07/10/01

471

100

302 00 0092 / 5774

2715 E 91ST ST

1.0

0 07/10/01

07/10/01

471

100

300 06 0167 / 5306

7400 S COLES AVE

1.0

0 05/25/99

05/25/99

351

100

6.0

0

2,706

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

Blocks

2565-2567 E 72ND PL

.0

Work Type: Lighting Imprvmnts

Installations

2565-2567 E 72ND PL

.0

281 00 / 33670

281 00 / 33670

Work Type: Loop Lighting 281 00 / 33670

2565-2567 E 72ND PL

Work Type: Ornamental - Piggyback Lighting

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

Blocks .0

Fixtures

300 09 / 33073

ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

47.0

07/07/08

07/25/08

64,050 07/07/08

07/25/08

57,551

100

300 11 / 32196

ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

71.0

01/04/08

03/11/08

95,850 01/04/08

03/11/08

81,295

100

300 11 / 32196

7113-7900 S EXCHANGE AVE

90.0

03/01/07

12/31/07

0 09/11/07

0

0

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 281 00 / 33670

2565-2567 E 72ND PL

Work Type: POD Camera Pole 281 00 / 33670

2565-2567 E 72ND PL

Work Type: Residential Regrouping 300 06 0270 / 5378

7129 S YATES BLVD

Totals per Lighting/Electrical

208.0

159,900

138,846

Blocks .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

1,828,759

1,825,474

Poles .0

Lamps .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 80

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0007 / 5430

ON S COLFAX AVE FROM E 75TH ST TO E 77TH ST

2.0

04/15/07

06/15/07

150,000 10/11/06

04/27/07

110,000

100

300 05 0007 / 5122

ON S ESSEX AVE FROM E 75TH ST TO E 77TH ST

2.0

11/01/05

04/01/06

170,000 09/20/05

11/11/05

96,164

100

300 07 0007 / 5430

ON S PHILLIPS AVE FROM E 75TH ST TO E 79TH ST

4.0

05/01/07

07/01/07

320,000 10/31/06

05/04/07

218,095

100

300 07 0007 / 5430

ON S SAGINAW AVE FROM S EXCHANGE AVE TO E 79TH ST

4.0

05/01/07

07/01/07

300,000 10/11/06

05/04/07

196,062

100

300 11 / 32196

7113-7900 S EXCHANGE AVE

.0

03/01/07

12/31/07

0

0

0

940,000

620,321

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

12.0

Blocks

300 03 0007 / 4878

ON S COLFAX AVE FROM E 77TH ST TO E 79TH ST

2.0

05/15/04

07/15/04

163,500 04/26/04

06/04/04

146,004

100

300 06 0267 / 5375

ON S ESSEX AVE FROM E 77TH ST TO E 79TH ST

2.0

03/15/04

05/15/04

162,741 03/05/04

05/03/04

155,686

100

300 06 0235 / 5349

ON S KINGSTON AVE FROM E 77TH ST TO E 79TH ST

2.0

05/20/03

07/20/03

152,935 05/06/03

07/16/03

144,540

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

2565-2567 E 72ND PL

302 00 0092 / 5774

8833 S MARQUETTE AVE

302 00 0092 / 5774

8843 S MARQUETTE AVE

Totals per Short Arm Installs - Arterial

Work Type: Short Arm Installs - Residntl 281 00 / 33670

2565-2567 E 72ND PL

302 00 0092 / 5774

8817 S MARQUETTE AVE

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

6.0

479,176

446,230

Locations 0

0

1.0

.0

01/01/08

12/31/08

0 0 02/13/01

02/13/01

378

100

1.0

0 02/13/01

02/13/01

378

100

2.0

0

756

Locations .0

01/01/08

12/31/08

0

1.0

0 02/13/01

1.0

0

02/13/01

0

0

378

100

378

Locations

300 09 / 33073

ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

50.0

05/05/08

06/27/08

12,500 05/05/08

05/23/08

10,000

100

300 11 / 32196

ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

71.0

01/04/08

03/11/08

15,620 01/04/08

03/11/08

14,200

100

300 06 0199 / 5324

ON S JEFFERY AVE FROM E 95TH ST TO E 96TH ST

24.0

09/20/02

10/01/02

10,384 10/31/02

11/01/02

1,901

100

300 09 / 33073

ON S KINGSTON AVE FROM E 85TH ST TO E 86TH ST

0

0

300 11 / 32196

7113-7900 S EXCHANGE AVE

0

0

Totals per Strt Light Pole Painting

4.0 100.0 249.0

800 03/01/07

12/31/07

0 08/10/07 39,304

08/18/07

26,101

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 81

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

2565-2567 E 72ND PL

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

2552 E 79TH ST

Work Type: Underpass Lighting

Blocks .0

01/01/08

12/31/08

0

03/01/04

12/01/04

4,295 07/31/06

0

0

08/22/06

8,995

100

Lamps 826.0

Fixtures

300 06 0099 / 5260

2552 E 79TH ST

552.0

08/12/03

08/19/03

31,027 08/08/03

08/15/03

23,163

100

805 06 2470 / 8656

2901 E 92ND ST

29.0

12/14/95

12/14/95

0 12/14/95

12/14/95

21,750

100

805 06 2471 / 8657

2901 E 92ND ST

17.0

12/14/95

12/14/95

0 12/14/95

12/14/95

12,750

100

805 06 2472 / 8658

2605 E 95TH ST

10.0

12/14/95

12/14/95

0 12/14/95

12/14/95

7,500

100

302 00 0070 / 5758

8920 S COLFAX AVE

0 06/11/97

06/18/97

10,041

100

302 00 0070 / 5758

8930 S COLFAX AVE

0 06/11/97

06/18/97

15,267

100

805 06 2136 / 8322

9340 S COLFAX AVE

0 08/28/97

08/28/97

73,500

100

302 00 0070 / 5758

9430 S COLFAX AVE

0 08/14/97

08/28/97

26,341

100

302 00 0070 / 5758

9230 S EXCHANGE AVE

0 07/01/97

07/08/97

7,824

100

805 06 2142 / 8328

9230 S EXCHANGE AVE

0 07/08/97

07/08/97

11,250

100

302 00 0070 / 5758

9240 S EXCHANGE AVE

0 06/17/97

06/24/97

12,751

100

805 06 2612 / 8798

9499 S JEFFERY AVE

70.0

11/03/94

11/03/94

0 11/03/94

11/03/94

52,500

100

805 06 2417 / 8603

8870 S KINGSTON AVE

23.0

10/31/95

10/31/95

0 10/31/95

10/31/95

17,250

100

805 06 2416 / 8602

8880 S KINGSTON AVE

23.0

10/31/95

10/31/95

0 10/31/95

10/31/95

17,250

100

302 00 0070 / 5758

8050 S MARQUETTE AVE

0 07/02/97

07/10/97

3,491

100

302 00 0070 / 5758

9100 S MARQUETTE AVE

0 07/02/97

07/08/97

14,396

100

805 06 2146 / 8332

9123 S MARQUETTE AVE

15.0

07/10/97

07/10/97

0 07/10/97

07/10/97

11,250

100

805 06 2172 / 8358

9123 S MARQUETTE AVE

15.0

07/08/97

07/08/97

0 07/08/97

07/08/97

11,250

100

805 06 2248 / 8434

9499 S PAXTON AVE

78.0

10/08/96

10/08/96

0 10/08/96

10/08/96

58,500

100

805 06 2166 / 8352

8885 S SOUTH CHICAGO AVE

37.0

06/18/97

06/18/97

0 06/18/97

06/18/97

27,750

100

805 06 2171 / 8357

8885 S SOUTH CHICAGO AVE

13.0

07/08/97

07/08/97

0 07/08/97

07/08/97

9,750

100

805 06 2217 / 8403

9551 S STONY ISLAND EXTENSION WEST

9.0

10/01/91

10/01/91

0 10/01/91

10/01/91

6,750

100

Totals per Underpass Lighting

98.0

15.0

1,004.0

08/28/97

07/08/97

08/28/97

07/08/97

31,027

452,274

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 82

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Locations

300 09 / 33073

E 94TH ST AND S PAXTON AVE

1.0

44,500

0

0

300 09 / 33073

E 95TH ST AND S MANISTEE AVE

1.0

41,000

0

0

2.0

85,500

0

Totals per Underpass Lighting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 83

1/1/2008 AND 12/31/2008

Ward 07 Sandi Jackson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0251 / 5361

9141 S SOUTH CHICAGO AVE

Work Type: LED Signal Head Install

Locations .0

08/01/07

10/01/07

33,580 07/02/07

08/15/07

34,879

100

Locations

210 06 0130 / 4389

S JEFFERY AVE AND E 95TH ST

.50

0 10/30/02

10/30/02

925

100

210 06 0130 / 4389

S SOUTH SHORE DR AND E 75TH ST

1.0

0 11/19/01

11/19/01

8,539

100

210 06 0130 / 4389

S SOUTH SHORE DR AND E 83RD ST

.50

0 10/23/01

10/23/01

4,270

100

2.0

0

Totals per LED Signal Head Install

Work Type: Signals 300 06 0096 / 5258

2552 E 79TH ST

Work Type: TSM Install

13,734

Intersections 13.0

07/18/03

07/24/03

0 07/16/06

10/21/06

2,056

100

Locations

210 06 0148 / 4400

E 75TH ST AND S YATES BLVD

1.0

09/01/03

11/01/03

200,000 08/15/03

10/17/03

120,661

100

210 06 0158 / 5058

E 95TH ST AND S PAXTON AVE

1.0

07/31/06

09/30/07

171,896 09/21/06

12/21/06

0

100

814 06 0060 / 16276

No finance info given in jcs Note Last Updated on 30-JAN-08 8300 S COLFAX AVE

1.0

11/09/95

11/09/95

0 11/09/95

11/09/95

125,000

100

814 06 0395 / 16582

8700 S COLFAX AVE

1.0

02/29/96

02/29/96

0 02/29/96

02/29/96

125,000

100

814 06 0371 / 16561

9299 S COLFAX AVE

1.0

05/23/96

05/23/96

0 05/23/96

05/23/96

129,704

100

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

371,896

500,365

Locations

300 09 / 33073

ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

3.0

05/05/08

06/27/08

600 05/05/08

05/23/08

252

100

300 11 / 32196

ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR

17.0

01/04/08

03/11/08

4,400 01/04/08

03/11/08

3,400

100

300 11 / 32196

7113-7900 S EXCHANGE AVE

.0

03/01/07

12/31/07

0

0

0

5,000

3,652

410,476

554,686

Totals per Construction Phase

2,239,235

2,380,160

Totals for Ward 07

2,241,655

2,382,486

Totals per Traffic Equipment Painting Totals per Traffic

20.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 84

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON S AVALON AVE FROM E 77TH ST TO E 78TH ST

.0

04/01/08

08/30/08

0

0

0

300 06 0275 / 5383

ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST

.0

10/01/04

06/30/05

0 10/01/04

06/30/05

2,492

100

300 06 0308 / 5414

ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,046

100

300 06 / 32277

ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST

.0

04/01/08

08/30/08

0

0

0

300 06 / 32277

ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST

.0

04/01/08

08/30/08

0

0

0

210 06 0243 / 4480

E 79TH ST AND S CREGIER AVE

.0

01/08/07

01/26/07

1,275

100

281 00 / 33670

8108 S STONY ISLAND AVE

.0

01/01/08

12/31/08

0

0

0

500

5,813

Totals per Design/Engineering

.0

500 01/08/07

01/26/07

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 85

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0122 / 5275

ON E 93RD ST FROM S COTTAGE GROVE AVE TO S KIMBARK AVE

8.0

11/01/03

11/02/03

3,200 11/07/03

11/10/03

5,501

100

300 11 / 32197

ON S AVALON AVE FROM E 77TH ST TO E 78TH ST

5.0

08/01/07

08/10/07

2,200 08/18/07

08/18/07

2,200

100

300 07 0008 / 5431

ON S AVALON AVE FROM E 91ST ST TO E 92ND ST

5.0

01/19/07

01/31/07

2,100 01/19/07

01/31/07

2,100

100

300 03 0005 / 4876

ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST

5.0

06/01/05

06/10/05

2,000 05/06/05

05/19/05

989

100

300 11 / 32197

ON S EUCLID AVE FROM E 80TH ST TO E 81ST ST

5.0

08/01/07

08/10/07

2,200 08/17/07

08/17/07

2,200

100

300 07 0008 / 5431

ON S LUELLA AVE FROM E 81ST ST TO E 82ND ST

5.0

01/19/07

01/31/07

2,100 01/19/07

01/31/07

2,100

100

300 06 0069 / 5233

1000 E 80TH ST

2.0

05/25/02

05/25/02

406 05/22/02

05/22/02

420

100

302 00 0092 / 5774

1000 E 90TH ST

4.0

02/09/03

02/09/03

840 02/06/03

02/06/03

840

100

300 06 0069 / 5233

1500 E 93RD ST

4.0

10/18/02

10/18/02

840 10/15/02

10/15/02

812

100

300 06 0069 / 5233

8200 S CLYDE AVE

4.0

10/18/02

10/18/02

840 10/15/02

10/15/02

812

100

300 03 0008 / 4879

8700 S CLYDE AVE

5.0

12/01/04

12/30/04

2,075 05/18/05

05/18/05

1,174

100

300 06 0069 / 5233

9200 S CLYDE AVE

5.0

02/16/03

02/16/03

2,000 02/13/03

02/13/03

3,086

100

302 00 0092 / 5774

7200 S CONSTANCE AVE

5.0

04/15/02

04/15/02

1,050 04/12/02

04/12/02

0

100

300 06 0069 / 5233

7200-7299 S CONSTANCE AVE

5.0

0 04/12/02

04/12/02

1,875

100

300 06 0069 / 5233

8800 S CORNELL AVE

4.0

1,500 09/12/02

09/12/02

1,318

100

300 06 0069 / 5233

8900 S CORNELL AVE

3.0

03/12/03

03/14/03

1,125 03/12/03

03/12/03

663

100

302 00 0092 / 5774

8501-8505 S CREGIER AVE

2.0

10/02/01

10/02/01

412 09/29/01

09/29/01

412

100

300 06 0122 / 5275

9200 S DOBSON AVE

5.0

11/01/03

11/01/03

1,975 11/10/03

11/10/03

1,191

100

300 06 0069 / 5233

8200 S DREXEL AVE

4.0

02/16/03

02/16/03

1,600 02/13/03

02/13/03

1,000

100

300 06 0122 / 5275

8300 S DREXEL AVE

5.0

11/01/03

11/01/03

1,975 11/10/03

11/10/03

1,191

100

300 06 0069 / 5233

8200 S ELLIS AVE

4.0

02/16/03

02/16/03

1,600 02/13/03

02/13/03

1,000

100

300 03 0008 / 4879

8600 S EUCLID AVE

5.0

08/01/04

08/05/04

2,075 07/07/04

07/07/04

1,194

100

300 09 / 33074

8700-8800 S EUCLID AVE

5.0

02/01/08

12/31/08

2,000 08/04/08

08/05/08

1,230

100

300 03 0008 / 4879

MATERIAL ORDERED Note Last Updated on 28-JUL-08 7600 S INGLESIDE AVE

4.0

08/01/04

08/05/04

1,700 07/07/04

07/07/04

1,311

100

300 06 0069 / 5233

8200 S INGLESIDE AVE

4.0

02/16/03

02/16/03

1,600 02/13/03

02/13/03

1,000

100

300 06 0069 / 5233

8200 S MARYLAND AVE

4.0

02/16/03

02/16/03

1,600 02/13/03

02/13/03

1,000

100

300 03 0008 / 4879

7900 S MERRILL AVE

5.0

08/01/04

08/05/04

2,075 07/07/04

07/07/04

1,194

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

121.0

43,088

37,813

1,235,551

1,606,085

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 86

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 05 0008 / 5123

ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE

300 06 0122 / 5275

ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST

Totals per 400 Watt Changeout

Fixtures 13.0

04/04/05

11/18/05

5,400 08/01/05

08/05/05

4,550

100

6.0

05/09/03

05/09/03

2,400 05/06/03

05/06/03

2,250

100

19.0

7,800

6,800

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 87

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1017 / 7203

1619 E 73RD ST

1.0

07/14/95

07/14/95

0 07/14/95

07/14/95

300

100

805 06 1621 / 7807

1061 E 80TH ST

1.0

09/11/97

09/11/97

0 09/11/97

09/11/97

300

100

805 06 0862 / 7048

1140 E 81ST ST

1.0

01/27/95

01/27/95

0 01/27/95

01/27/95

300

100

805 06 0751 / 6937

1503 E 85TH ST

1.0

07/21/95

07/21/95

0 07/21/95

07/21/95

300

100

805 06 0754 / 6940

1329 E 89TH ST

1.0

12/01/95

12/01/95

0 12/01/95

12/01/95

300

100

805 06 0755 / 6941

1333 E 89TH ST

1.0

11/28/95

11/28/95

0 11/28/95

11/28/95

300

100

300 06 0069 / 5233

1400 E 89TH ST

2.0

03/12/03

03/14/03

700 03/12/03

03/12/03

442

100

805 06 0759 / 6945

1101 E 93RD ST

1.0

10/13/95

10/13/95

0 10/13/95

10/13/95

300

100

805 06 0760 / 6946

1104 E 93RD ST

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

805 06 0762 / 6948

1125 E 93RD ST

1.0

10/13/95

10/13/95

0 10/13/95

10/13/95

300

100

805 06 0791 / 6977

1019 E 95TH ST

1.0

09/20/96

09/20/96

0 09/20/96

09/20/96

300

100

805 06 0867 / 7053

9526 S AVALON AVE

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

805 06 0868 / 7054

9536 S AVALON AVE

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

805 06 0823 / 7009

8718 S BLACKSTONE AVE

1.0

06/14/95

06/14/95

0 06/14/95

06/14/95

300

100

805 06 2002 / 8188

8222 S CHAPPEL AVE

1.0

06/19/95

06/19/95

0 06/19/95

06/19/95

300

100

805 06 1983 / 8169

8240 S CHAPPEL AVE

1.0

10/30/95

10/30/95

0 10/30/95

10/30/95

300

100

300 06 0139 / 5289

8539 S COTTAGE GROVE AVE

2,007.0

03/01/06

09/01/06

47,645 07/01/06

08/04/06

60,640

100

302 00 0092 / 5774

75& complete as of 07/26/06 Note Last Updated on 26-JUL-06 8539 S COTTAGE GROVE AVE

0 02/28/01

01/11/02

4,006

100

805 06 1623 / 7809

8826 S DORCHESTER AVE

1.0

09/11/97

09/11/97

0 09/11/97

09/11/97

300

100

805 06 1765 / 7951

9338 S EAST END AVE

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 1374 / 7560

7659 S JEFFERY BLVD

1.0

04/13/95

04/13/95

0 04/13/95

04/13/95

300

100

805 06 1662 / 7848

7736 S JEFFERY BLVD

1.0

08/05/97

08/05/97

0 08/05/97

08/05/97

300

100

805 06 1856 / 8042

8335 S LUELLA AVE

1.0

06/22/95

06/22/95

0 06/22/95

06/22/95

300

100

805 06 1857 / 8043

8738 S LUELLA AVE

1.0

12/12/95

12/12/95

0 12/12/95

12/12/95

300

100

805 06 1622 / 7808

7809 S MERRILL AVE

1.0

09/11/97

09/11/97

0 09/11/97

09/11/97

300

100

805 06 1823 / 8009

8114 S MERRILL AVE

1.0

02/20/97

02/20/97

0 02/20/97

02/20/97

300

100

805 06 0572 / 6758

8136 S OGLESBY AVE

1.0

05/30/96

05/30/96

0 05/30/96

05/30/96

300

100

805 06 0573 / 6759

8222 S OGLESBY AVE

1.0

08/29/95

08/29/95

0 08/29/95

08/29/95

300

100

805 06 0547 / 6733

7600 S PAXTON AVE

1.0

06/12/96

06/12/96

0 06/12/96

06/12/96

300

100

302 00 0092 / 5774

7901 S STONY ISLAND AVE

1.0

0 09/21/01

09/21/01

236

100

17.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 88

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 0405 / 6591

9755 S UNIVERSITY AVE

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

8539 S COTTAGE GROVE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

8539 S COTTAGE GROVE AVE

Work Type: Flood Light Install 302 00 0092 / 5774

1112 E 81ST PL

Work Type: Lighting Imprvmnts 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: Lighting Imprvmnts 300 06 0122 / 5275

1419 E 89TH ST

281 00 / 33670

8108 S STONY ISLAND AVE

Totals per Lighting Imprvmnts

Work Type: Loop Lighting 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: Ornamental - Piggyback Lighting 300 05 0008 / 5123

ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE

Work Type: Ornamental Lighting 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: POD Camera Pole 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

8539 S COTTAGE GROVE AVE

Installations 1.0

10/23/96

10/23/96

2,054.0

0 10/23/96

10/23/96

48,345

300

100

73,424

Lamps 1,750.0

06/01/07

12/31/07

51,520 11/15/07

01/05/08

49,962

100

0 08/15/02

08/27/02

29,534

100

0 03/16/01

03/16/01

471

100

0

0

Installations 1,622.0

Fixtures 1.0

Blocks .0

01/01/08

12/31/08

5.0

06/01/03

06/02/03

.0

01/01/08

12/31/08

0

Installations

5.0

5,000 06/06/03

2,960

100

0

06/09/03

0

0

5,000

2,960

0

0

0

22,920

100

Blocks .0

01/01/08

12/31/08

04/04/05

11/18/05

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Fixtures 1.0

16,200 08/01/05

08/05/05

Blocks .0

Poles .0

Lamps .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 89

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 11 / 32197

ON E 87TH PL FROM S COTTAGE GROVE AVE TO S DAUPHIN AVE

1.50

05/31/07

08/03/07

300 06 / 32277

ON S AVALON AVE FROM E 77TH ST TO E 78TH ST

.0

05/04/08

12/31/08

300 11 / 32197

ON S DOBSON AVE FROM E 98TH ST TO E 99TH ST

1.0

06/18/07

07/27/07

300 11 / 32197

ON S DREXEL AVE FROM E 81ST ST TO E 82ND ST

1.0

08/15/07

300 11 / 32197

ON S ELLIS AVE FROM E 91ST ST TO E 93RD ST

2.0

06/18/07

300 06 0308 / 5414

ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST

2.0

300 06 / 32277

ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST

300 06 / 32277

ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375

ON S DOBSON AVE FROM E 79TH ST TO E 81ST ST

Work Type: Short Arm Installs - Arterial 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

9004 S DAUPHIN AVE

281 00 / 33670

8108 S STONY ISLAND AVE

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

75,000 05/31/07

08/10/07

0

59,977

100

0

0

80,000 06/13/07

09/21/07

55,303

100

10/22/07

80,000 08/15/07

09/28/07

31,966

100

08/03/07

150,000 06/11/07

08/31/07

96,984

100

03/16/06

12/31/06

177,798 10/04/06

05/07/07

131,870

100

.0

05/04/08

12/31/08

0

0

0

.0

05/04/08

12/31/08

0

0

0

562,798

376,100

7.50

Blocks 2.0

09/15/04

11/15/04

01/01/08

12/31/08

01/01/08

12/31/08

140,663 08/11/04

10/04/04

135,926

100

0

0

Locations .0

0

Locations 1.0 .0

0 05/24/01

1.0

378

100

0

05/24/01

0

0

0

378

Locations

300 05 0008 / 5123

ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE

12.0

04/04/05

11/18/05

3,000 09/01/05

10/20/05

2,812

100

302 00 0076 / 5764

ON E 83RD ST FROM S COTTAGE GROVE AVE TO S STONY ISLAND AVE

61.0

06/23/98

06/26/98

0 06/23/98

06/26/98

1,037

100

300 04 0216 / 5114

ON E 87TH ST FROM S COTTAGE GROVE AVE TO S INGLESIDE AVE

15.0

05/01/06

11/01/06

3,172 05/17/06

06/02/06

3,172

100

302 00 0077 / 5765

ON S DORCHESTER AVE FROM E 87TH ST TO E 88TH ST

6.0

0 07/16/99

07/16/99

524

100

302 00 0076 / 5764

7900 S JEFFERY AVE

8.0

08/01/98

08/01/98

0 08/01/98

08/01/98

136

100

302 00 0076 / 5764

8600 S JEFFERY AVE

9.0

08/02/98

08/02/98

0 08/02/98

08/02/98

153

100

302 00 0076 / 5764

8700 S STONY ISLAND AVE

17.0

07/19/98

07/20/98

0 07/19/98

07/20/98

289

100

Totals per Strt Light Pole Painting

128.0

6,172

8,123

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 90

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

8108 S STONY ISLAND AVE

Work Type: Strt Lighting

Blocks .0

01/01/08

12/31/08

0

0

0

Blocks

300 06 0247 / 5357

ON E 87TH PL FROM S CORNELL AVE TO S RIDGELAND AVE

1.50

09/15/03

11/30/03

109,000 09/09/03

11/07/03

108,367

100

300 03 0008 / 4879

ON E 87TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE

2.0

07/15/04

09/15/04

162,800 07/19/04

09/15/04

142,865

100

300 06 0275 / 5383

ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST

.50

40,000 08/22/05

01/10/06

66,342

100

4.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

8539 S COTTAGE GROVE AVE

311,800

317,574

Lamps 1,645.0

03/01/04

12/01/04

8,554 07/31/06

08/22/06

17,914

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 91

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2607 / 8793

1160 E 76TH ST

42.0

02/27/95

02/27/95

0 02/27/95

02/27/95

31,500

100

805 06 2608 / 8794

1165 E 76TH ST

10.0

02/27/95

02/27/95

0 02/27/95

02/27/95

7,500

100

805 06 2337 / 8523

1195 E 79TH ST

30.0

08/07/93

08/07/93

0 08/07/93

08/07/93

22,500

100

805 06 2352 / 8538

1045 E 82ND ST

10.0

08/30/93

08/30/93

0 08/30/93

08/30/93

7,500

100

805 06 2604 / 8790

1045 E 82ND ST

27.0

08/30/93

08/30/93

0 08/30/93

08/30/93

20,250

100

805 06 2316 / 8502

1005 E 83RD ST

8.0

08/03/93

08/03/93

0 08/03/93

08/03/93

6,000

100

805 06 2331 / 8517

1005 E 83RD ST

10.0

08/03/93

08/03/93

0 08/03/93

08/03/93

7,500

100

805 06 2336 / 8522

1005 E 83RD ST

16.0

08/03/93

08/03/93

0 08/03/93

08/03/93

12,000

100

805 06 2492 / 8678

2110 E 85TH ST

13.0

12/08/95

12/08/95

0 12/08/95

12/08/95

9,750

100

805 06 2467 / 8653

2200 E 85TH ST

13.0

12/08/95

12/08/95

0 12/08/95

12/08/95

9,750

100

805 06 2367 / 8553

2220 E 86TH ST

12.0

02/15/94

02/15/94

0 02/15/94

02/15/94

9,000

100

805 06 2382 / 8568

2220 E 86TH ST

12.0

02/15/94

02/15/94

0 02/15/94

02/15/94

9,000

100

805 06 2324 / 8510

945 E 87TH ST

41.0

05/13/96

05/13/96

0 05/13/96

05/13/96

30,750

100

805 06 2373 / 8559

1290 E 87TH ST

10.0

10/18/95

10/18/95

0 10/18/95

10/18/95

7,500

100

805 06 2427 / 8613

845 E 91ST ST

10.0

08/03/93

08/03/93

0 08/03/93

08/03/93

7,500

100

805 06 2958 / 9144

835 E 93RD ST

26.0

08/02/93

08/02/93

0 08/02/93

08/02/93

19,500

100

302 00 0070 / 5758

830 E 95TH ST

0 06/12/97

06/19/97

18,592

100

805 06 2462 / 8648

1235 E 95TH ST

10.0

08/11/93

08/11/93

0 08/11/93

08/11/93

7,500

100

805 06 2615 / 8801

1495 E 95TH ST

30.0

12/20/94

12/20/94

0 12/20/94

12/20/94

22,500

100

300 06 0099 / 5260

8539 S COTTAGE GROVE AVE

598.0

08/20/03

08/27/03

33,611 08/18/03

08/25/03

24,521

100

805 06 2465 / 8651

9495 S COTTAGE GROVE AVE

28.0

11/07/95

11/07/95

0 11/07/95

11/07/95

21,000

100

805 06 2401 / 8587

7998 S EAST END AVE

11.0

10/07/93

10/07/93

0 10/07/93

10/07/93

8,250

100

805 06 2415 / 8601

7998 S EAST END AVE

9.0

10/05/93

10/05/93

0 10/05/93

10/05/93

6,750

100

805 06 2274 / 8460

7499 S GREENWOOD AVE

6.0

12/31/95

12/31/95

0 12/31/95

12/31/95

4,500

100

805 06 2635 / 8821

8301 S JEFFERY BLVD

17.0

11/01/94

11/01/94

0 11/01/94

11/01/94

12,750

100

805 06 2636 / 8822

8301 S JEFFERY BLVD

21.0

11/01/94

11/01/94

0 11/01/94

11/01/94

15,750

100

805 06 2617 / 8803

7901 S STONY ISLAND AVE

25.0

11/16/94

11/16/94

0 11/16/94

11/16/94

18,750

100

302 00 0072 / 5760

7940 S STONY ISLAND AVE

1.0

0 03/20/00

04/26/00

10,208

100

302 00 0072 / 5760

7950 S STONY ISLAND AVE

1.0

0 03/20/00

04/26/00

10,208

100

302 00 0072 / 5760

9440 S STONY ISLAND AVE

1.0

0 03/02/00

03/17/00

17,156

100

805 06 2637 / 8823

9499 S STONY ISLAND AVE

20.0

0 10/01/91

10/01/91

15,000

100

10/01/91

10/01/91

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 92

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2262 / 8448

9500 S STONY ISLAND EXTENSION WEST

10.0

12/31/96

12/31/96

0 12/31/96

12/31/96

7,500

100

805 06 2298 / 8484

9500 S STONY ISLAND EXTENSION WEST

6.0

12/31/96

12/31/96

0 12/31/96

12/31/96

4,500

100

805 06 2102 / 8288

9340 S WOODLAWN AVE

42.0

07/31/97

07/31/97

0 07/31/97

07/31/97

31,500

100

302 00 0070 / 5758

9490 S WOODLAWN AVE

0 07/24/97

07/31/97

12,751

100

805 06 2323 / 8509

837 W 87TH ST

24.0

06/05/96

06/05/96

0 06/05/96

06/05/96

18,000

100

805 06 2941 / 9127

865 W 88TH ST

16.0

12/10/93

12/10/93

0 12/10/93

12/10/93

12,000

100

805 06 2943 / 9129

905 W 89TH ST

12.0

12/08/93

12/08/93

0 12/08/93

12/08/93

9,000

100

Totals per Underpass Lighting

1,178.0

33,611

526,186

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 93

1/1/2008 AND 12/31/2008

Ward 08 Michelle Harris CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S COTTAGE GROVE AVE AND E 85TH ST

.50

5,282 04/19/05

04/19/05

2,910

100

210 06 0130 / 4389

S COTTAGE GROVE AVE AND E 86TH ST

.50

0 10/04/02

10/04/02

925

100

210 06 0130 / 4389

S JEFFERY AVE AND E 95TH ST

.50

0 10/30/02

10/30/02

925

100

210 06 0130 / 4389

S WOODLAWN AVE AND E 83RD ST

1.0

0 07/12/02

07/12/02

6,867

100

Totals per LED Signal Head Install

Work Type: New Signal

04/24/05

04/24/05

2.50

5,282

11,627

Locations

210 06 0190 / 4435

E 79TH ST AND S CREGIER AVE

1.0

10/15/04

01/31/05

190,000 09/08/04

02/10/05

148,195

100

210 06 0164 / 4415

E 86TH ST AND S COTTAGE GROVE AVE

.50

08/15/02

10/01/02

86,635 08/15/02

10/09/02

78,583

100

1.50

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

E 79TH ST AND S CREGIER AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

S DORCHESTER AVE AND E 83RD ST

Work Type: Signals 300 06 0096 / 5258

8539 S COTTAGE GROVE AVE

Work Type: TSM Install

276,635

226,778

Locations .0

03/03/06

05/08/07

12,000 03/16/07

03/20/07

4,040

100

4,000 05/09/01

06/07/01

10,897

100

6,641

100

Crossings 1.0

Intersections 42.0

07/28/03

07/30/03

0 07/26/03

08/01/03

Locations

210 06 0163 / 4414

E 87TH ST AND S COTTAGE GROVE AVE

.50

10/01/02

10/15/02

31,843 10/08/02

12/16/02

30,190

100

814 06 0210 / 16422

8699 S ANTHONY AVE

1.0

05/17/94

05/17/94

0 05/17/94

05/17/94

120,000

100

814 06 0205 / 16417

8655 S SOUTH CHICAGO AVE

1.0

05/23/94

05/23/94

0 05/23/94

05/23/94

120,000

100

210 06 0072 / 4336

8500 S YATES AVE

1.0

03/01/01

05/01/01

150,000 10/16/00

01/17/01

119,320

100

3.50

181,843

389,510

479,759

649,492

Totals per Construction Phase

1,715,310

2,255,577

Totals for Ward 08

1,715,810

2,261,390

Totals per TSM Install Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 94

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32454

ALTEGELD GARDENS

12/31/07

276,000 08/31/07

5,500

25

300 06 / 32455

Lighting project to include private streets being maintained by BOE forces Note Last Updated on 11-FEB-08 PHILLIP MURRAY HOMES .0 04/02/07 12/10/08

28,000 11/02/07

24,000

95

300 06 0308 / 5414

Block 15 & 16 will be done together with Altgeld Gardens as they are bounded by each other Note Last Updated on 11-FEB-08 ON S WABASH AVE FROM E 105TH ST TO E 107TH ST .0 02/01/06 07/31/06

0 02/01/06

07/31/06

2,323

100

300 06 0292 / 5399

106 E 107TH ST

1.0

03/01/05

03/31/05

2,000 01/04/05

02/09/05

0

100

300 06 0292 / 5399

813 E 114TH ST

1.0

02/28/05

03/18/05

2,000 10/08/04

11/15/04

614

100

Totals per Design/Engineering

.0

2.0

04/02/07

308,000

32,437

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 95

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 09 / 33075

ON E 117TH ST FROM S CALUMET AVE TO S FRONT AVE

3.0

09/08/08

09/12/08

1,200 09/03/08

09/03/08

675

100

300 09 / 33075

ON E 118TH PL FROM S MICHIGAN AVE TO S STATE ST

3.0

02/01/08

12/31/08

1,200 09/02/08

09/02/08

675

100

300 09 / 33075

MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 118TH ST FROM S STATE ST TO S MICHIGAN AVE

2.0

09/02/08

09/03/08

800 09/02/08

09/03/08

450

100

300 09 / 33075

ON E 126TH ST FROM S STATE ST TO S MICHIGAN AVE

5.0

09/03/08

09/04/08

2,000 09/03/08

09/04/08

1,125

100

300 09 / 33075

ON S CALUMET AVE FROM E 108TH ST TO E 109TH ST

4.0

09/03/08

09/03/08

1,600 09/03/08

09/03/08

900

100

300 09 / 33075

ON S EBERHART AVE FROM E 107TH ST TO E 108TH ST

5.0

09/03/08

09/03/08

2,000 09/03/08

09/03/08

1,125

100

300 09 / 33075

ON S FOREST AVE FROM E 106TH ST TO E 107TH ST

5.0

09/04/08

09/04/08

2,000 09/04/08

09/04/08

1,125

100

300 09 / 33075

ON S INDIANA AVE FROM E 101ST ST TO E 102ND ST

3.0

09/08/08

09/10/08

1,200 09/03/08

09/03/08

675

100

300 09 / 33075

ON S INDIANA AVE FROM E 113TH ST TO E 114TH PL

6.0

09/05/08

09/05/08

2,400 09/05/08

09/05/08

1,350

100

300 09 / 33075

ON S LAFAYETTE AVE FROM W 122ND ST TO W 123RD ST

3.0

09/05/08

09/05/08

1,200 09/05/08

09/05/08

675

100

300 06 0069 / 5233

ON S MARYLAND AVE FROM E 104TH ST TO E 106TH ST

8.0

3,000 05/08/02

05/08/02

3,000

100

300 09 / 33075

ON S PERRY AVE FROM W 121ST ST TO W 122ND ST

4.0

09/08/08

09/08/08

1,600 09/08/08

09/08/08

900

100

300 09 / 33075

ON S PRAIRIE AVE FROM E 104TH ST TO E 106TH ST

8.0

09/02/08

09/02/08

3,200 09/02/08

09/02/08

1,575

100

300 09 / 33075

ON S VERNON AVE FROM E 101ST ST TO E 102ND ST

4.0

09/08/08

09/08/08

1,600 09/08/08

09/08/08

900

100

302 00 0092 / 5774

ON S WABASH AVE FROM E 105TH ST TO E 110TH ST

30.0

0 12/27/01

12/27/01

6,179

100

300 09 / 33075

ON S WALLACE ST FROM W 99TH ST TO W 101ST ST

5.0

2,000 09/02/08

09/03/08

1,125

100

302 00 0092 / 5774

11300-11399 S CALUMET AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11400-11499 S CALUMET AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11300-11399 S FOREST AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11400-11499 S FOREST AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

10100-10199 S PERRY AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

10200-10299 S PERRY AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11300-11399 S PRAIRIE AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11400-11499 S PRAIRIE AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11500-11599 S PRAIRIE AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

10059 S STATE ST

1.0

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

10900-10999 S VERNON AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11000-11099 S VERNON AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11100-11199 S VERNON AVE

5.0

0 10/04/01

10/05/01

1,029

100

302 00 0092 / 5774

11200-11299 S VERNON AVE

5.0

0 10/04/01

10/05/01

1,029

100

09/08/08

10/25/01

09/12/08

10/27/01

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 96

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

Fixtures 164.0

27,236

36,067

Fixtures

300 09 / 33075

ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE

56.0

11/17/08

12/08/08

22,400 12/15/08

01/09/09

18,928

100

300 09 / 33075

ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE

8.0

09/15/08

09/19/08

3,200 12/15/08

12/19/08

2,707

100

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

7.0

12/15/08

01/09/09

2,800 12/15/08

01/09/09

2,366

100

300 09 / 33074

10000-10300 S COTTAGE GROVE AVE

21.0

09/22/08

10/03/08

8,400 12/16/08

12/29/08

8,400

100

300 06 / 33764

10000-11600 S MICHIGAN AVE

181.0

12/01/08

04/30/09

72,400 12/01/08

01/09/09

60,608

100

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

273.0

109,200

93,009

Installations

300 06 0204 / 5327

E 111TH ST AND S DR MARTIN LUTHER KING JR DR

2.0

08/15/01

08/15/01

640 10/03/01

10/03/01

640

100

300 06 0204 / 5327

E 111TH ST AND S VERNON AVE

2.0

08/15/01

08/15/01

640 10/03/01

10/03/01

640

100

300 06 0204 / 5327

400 E 111TH ST

2.0

08/15/01

08/15/01

640 09/29/01

09/29/01

640

100

300 06 0096 / 5258

34 E 112TH PL

1,898.0

03/01/03

09/01/03

49,575 03/01/06

09/01/06

57,346

0

302 00 0092 / 5774

34 E 112TH PL

39.0

0 03/16/01

01/24/02

9,190

100

805 06 0917 / 7103

362 E 119TH ST

1.0

0 06/07/95

06/07/95

300

100

302 00 0092 / 5774

221 E KENSINGTON AVE

1.0

0 03/23/01

03/23/01

236

100

805 06 0805 / 6991

10441 S CALUMET AVE

1.0

02/19/96

02/19/96

0 02/19/96

02/19/96

300

100

805 06 0324 / 6510

11431 S CHAMPLAIN AVE

1.0

01/03/95

01/03/95

0 01/03/95

01/03/95

300

100

805 06 1590 / 7776

12059 S INDIANA AVE

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

805 06 0316 / 6502

12438 S LA SALLE ST

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

302 00 0092 / 5774

11232 S MICHIGAN AVE

1.0

0 01/11/02

01/11/02

236

100

302 00 0092 / 5774

11000 S WABASH AVE

1.0

0 11/30/01

11/30/01

236

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

34 E 112TH PL

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

34 E 112TH PL

06/07/95

06/07/95

1,951.0

51,495

70,664

Lamps 1,536.0

06/01/07

12/31/07

45,219 01/22/08

02/13/08

43,852

100

0 09/09/02

09/14/02

28,059

100

Installations 1,541.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 97

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Fixtures

Work Type: Flood Light Install 300 06 0198 / 5323

ALTGELD GARDENS (CHA)

300 06 0204 / 5327

E 111TH ST AND S DR MARTIN LUTHER KING JR DR

300 06 0071 / 5234

201 E 111TH ST

2.0

300 09 / 33074

139,000 02/05/01

02/28/01

138,085

100

10/16/01

2,350 10/03/01

10/03/01

0

100

06/01/99

12/30/00

0 09/14/00

09/15/00

4,500

100

141,350

142,585

Installations

10000-10300 S COTTAGE GROVE AVE

Work Type: Lighting Imprvmnts

02/28/01

10/16/01

2.0

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

02/05/01

11.0

02/01/08

12/31/08

6,560 12/16/08

12/29/08

7,560

100

Projects

300 06 / 32454

ALTEGELD GARDENS

.0

04/02/07

12/31/08

2,760,000

0

0

300 06 / 32455

PHILLIP MURRAY HOMES

.0

04/02/07

12/31/08

500,000

0

0

3,260,000

0

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

.0

Fixtures

300 09 / 33075

ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE

56.0

11/24/08

12/24/08

75,600 12/15/08

01/09/09

64,176

100

300 09 / 33075

ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE

8.0

09/22/08

09/30/08

10,800 12/15/08

12/19/08

9,153

100

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

7.0

12/15/08

01/09/09

9,450 12/15/08

01/09/09

8,022

100

300 09 / 33074

10000-10300 S COTTAGE GROVE AVE

21.0

10/06/08

10/24/08

28,350 01/23/09

01/29/09

27,953

100

300 06 / 33764

10000-11600 S MICHIGAN AVE

179.0

12/01/08

04/30/09

241,550 12/01/08

01/09/09

237,954

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

34 E 112TH PL

Work Type: Residntl Staggered Lighting

271.0

365,750

347,258

0

Lamps .0

03/01/08

12/01/08

0

0

Blocks

300 09 / 33075

ON S PRAIRIE AVE FROM E 100TH ST TO E 102ND ST

2.0

09/08/08

12/05/08

137,000

300 06 0308 / 5414

ON S WABASH AVE FROM E 105TH ST TO E 107TH ST

2.0

06/05/06

08/15/06

190,228 06/05/06

08/15/06

0

0

131,870

100

Project has been completed as of 08/15/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON S LANGLEY AVE FROM E 112TH ST TO E 114TH ST

4.0

327,228

131,870

Blocks 2.0

03/26/03

05/21/03

166,636 03/26/03

06/01/03

156,226

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 98

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

10315 S MICHIGAN AVE

1.0

0 06/20/01

06/20/01

378

100

302 00 0092 / 5774

10316 S MICHIGAN AVE

1.0

0 06/20/01

06/20/01

378

100

302 00 0092 / 5774

10327 S MICHIGAN AVE

1.0

0 06/20/01

06/20/01

378

100

302 00 0092 / 5774

10328 S MICHIGAN AVE

1.0

0 06/20/01

06/20/01

378

100

4.0

0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

1,512

Locations

300 09 / 33075

ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE

56.0

09/05/08

09/12/08

16,800 09/05/08

09/12/08

11,760

100

300 09 / 33075

ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE

16.0

02/01/08

12/31/08

4,800 11/12/08

11/21/08

4,515

100

300 09 / 33075

ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE

8.0

09/02/08

09/10/08

2,400 09/02/08

09/05/08

1,680

100

300 04 0216 / 5114

ON S MICHIGAN AVE FROM E 113TH ST TO E 115TH ST

28.0

05/01/06

11/01/06

6,056 05/17/06

06/22/06

6,056

100

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

7.0

09/05/08

09/12/08

2,100 09/05/08

09/12/08

1,470

100

210 06 0166 / 4417

E 100TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/17/03

2,180

100

210 06 0166 / 4417

E 103RD ST AND S DR MARTIN LUTHER KING JR DR

04/22/03

05/10/03

3,000 04/22/03

05/16/03

2,180

100

210 06 0166 / 4417

E 107TH ST AND S DR MARTIN LUTHER KING JR DR

04/22/03

05/10/03

3,000 04/22/03

05/16/03

2,180

100

210 06 0166 / 4417

E 107TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/10/03

2,180

100

210 06 0166 / 4417

E 111TH ST AND S DR MARTIN LUTHER KING JR DR

04/22/03

05/10/03

3,000 04/22/03

05/10/03

2,180

100

210 06 0166 / 4417

E 111TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/09/03

2,180

100

210 06 0166 / 4417

E 113TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/05/03

2,180

100

210 06 0166 / 4417

E 115TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/07/03

2,180

100

210 06 0166 / 4417

E 119TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/06/03

2,180

100

210 06 0166 / 4417

E 127TH ST AND S MICHIGAN AVE

04/22/03

05/10/03

3,000 04/22/03

05/03/03

2,180

100

300 09 / 33074

10000-10300 S COTTAGE GROVE AVE

21.0

08/27/08

09/12/08

6,700 07/07/08

07/15/08

4,410

100

300 06 / 33764

10000-11600 S MICHIGAN AVE

236.0

12/01/08

04/30/09

52,050 12/01/08

12/19/08

44,610

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 300 06 0204 / 5327

E 111TH ST AND S VERNON AVE

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

34 E 114TH PL

372.0

120,906

96,301

Blocks 5.0

10/15/01

10/15/01

1,050 09/29/01

09/29/01

1,029

100

03/01/04

12/01/04

5,091 07/31/06

08/16/06

10,661

100

Lamps 979.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 99

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2880 / 9066

698 E 100TH ST

28.0

06/03/94

06/03/94

0 06/03/94

06/03/94

21,000

100

805 06 2519 / 8705

694 E 103RD ST

34.0

01/24/96

01/24/96

0 01/24/96

01/24/96

25,500

100

805 06 2320 / 8506

598 E 105TH ST

28.0

06/03/94

06/03/94

0 06/03/94

06/03/94

21,000

100

805 06 2354 / 8540

590 E 107TH ST

34.0

03/19/96

03/19/96

0 03/19/96

03/19/96

25,500

100

805 06 2774 / 8960

598 E 109TH ST

28.0

06/03/94

06/03/94

0 06/03/94

06/03/94

21,000

100

805 06 2356 / 8542

530 E 111TH ST

32.0

04/01/96

04/01/96

0 04/01/96

04/01/96

24,000

100

300 06 0099 / 5260

34 E 112TH PL

284.0

08/28/03

09/02/03

15,962 08/26/03

08/27/03

12,851

100

805 06 2655 / 8841

498 E 113TH ST

24.0

06/06/94

06/06/94

0 06/06/94

06/06/94

18,000

100

805 06 2302 / 8488

101 E 116TH ST

14.0

12/03/93

12/03/93

0 12/03/93

12/03/93

10,500

100

805 06 2830 / 9016

198 E 130TH ST

26.0

05/15/94

05/15/94

0 05/15/94

05/15/94

19,500

100

805 06 2206 / 8392

815 E 95TH ST

44.0

06/19/97

06/19/97

0 06/19/97

06/19/97

33,000

100

805 06 2436 / 8622

432 E KENSINGTON AVE

34.0

10/27/95

10/27/95

0 10/27/95

10/27/95

25,500

100

805 06 2829 / 9015

11695 S INDIANA AVE

10.0

05/01/94

05/01/94

0 05/01/94

05/01/94

7,500

100

805 06 2177 / 8363

13001 S INDIANA AVE

18.0

04/11/97

04/11/97

0 04/11/97

04/11/97

13,500

100

805 06 2178 / 8364

13001 S INDIANA AVE

14.0

12/31/95

12/31/95

0 12/31/95

12/31/95

10,500

100

302 00 0070 / 5758

13140 S INDIANA AVE

0 04/04/97

04/11/97

16,636

100

805 06 2347 / 8533

11598 S MICHIGAN AVE

14.0

11/26/93

11/26/93

0 11/26/93

11/26/93

10,500

100

805 06 2556 / 8742

11701 S PRAIRIE AVE

10.0

06/14/95

06/14/95

0 06/14/95

06/14/95

7,500

100

Totals per Underpass Lighting Totals per Lighting/Electrical

676.0

15,962

323,487

4,643,683

1,490,140

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 100

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0166 / 4417

E 100TH ST AND S MICHIGAN AVE

1.0

02/02/03

02/07/03

12,000 02/07/03

02/10/03

11,895

100

210 06 0166 / 4417

E 103RD ST AND S DR MARTIN LUTHER KING JR DR

1.0

02/02/03

02/07/03

12,000 02/11/03

05/16/03

11,895

100

210 06 0166 / 4417

E 107TH ST AND S DR MARTIN LUTHER KING JR DR

1.0

02/04/03

02/08/03

12,000 02/17/03

02/19/03

11,895

100

210 06 0166 / 4417

E 107TH ST AND S MICHIGAN AVE

1.0

02/04/03

02/08/03

12,000 02/19/03

02/21/03

11,895

100

210 06 0166 / 4417

E 111TH ST AND S DR MARTIN LUTHER KING JR DR

1.0

02/06/03

02/09/03

12,000 02/24/03

02/26/03

11,895

100

210 06 0166 / 4417

E 111TH ST AND S MICHIGAN AVE

1.0

02/06/03

02/09/03

12,000 02/26/03

02/28/03

11,895

100

210 06 0166 / 4417

E 113TH ST AND S MICHIGAN AVE

1.0

02/06/03

02/09/03

12,000 03/03/03

03/05/03

11,896

100

210 06 0166 / 4417

E 115TH ST AND S MICHIGAN AVE

1.0

02/10/03

02/12/03

12,000 03/05/03

03/06/03

11,896

100

210 06 0166 / 4417

E 119TH ST AND S MICHIGAN AVE

1.0

02/10/03

02/12/03

12,000 03/06/03

03/07/03

11,896

100

210 06 0166 / 4417

E 127TH ST AND S MICHIGAN AVE

1.0

02/10/03

02/12/03

12,000 03/07/03

03/10/03

11,896

100

Totals per LED Signal Head Install

Work Type: Removal Temp Wiring - Signals

10.0

120,000

118,954

Crossings

300 06 0197 / 5322

S MICHIGAN AVE AND E 127TH ST

1.0

4,000 04/30/01

05/03/01

1,885

100

300 06 0197 / 5322

S WALLACE ST AND W VERMONT ST

1.0

4,000 04/27/01

05/17/01

3,631

100

2.0

8,000

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

34 E 112TH PL

Work Type: TSM Install

5,516

Intersections 25.0

07/22/03

07/25/03

0 07/21/06

09/28/06

3,953

100

Locations

210 06 0074 / 4338

100 E 103RD ST

1.0

04/01/03

06/01/03

242,000 03/14/03

07/10/03

227,309

100

210 06 0069 / 4333

10000 S DR MARTIN LUTHER KING JR DR

1.0

06/01/99

12/01/99

167,500 07/30/99

01/20/00

112,132

100

814 06 0251 / 16463

11100 S DR MARTIN LUTHER KING JR DR

1.0

08/15/89

08/15/89

0 08/15/89

08/15/89

80,756

100

814 06 0066 / 16282

11100 S ELLIS AVE

1.0

03/26/91

03/26/91

0 03/26/91

03/26/91

212,115

100

814 06 0123 / 16337

13000 S ELLIS AVE

1.0

03/02/95

03/02/95

0 03/02/95

03/02/95

392,625

100

814 06 0250 / 16462

11100 S INDIANA AVE

1.0

09/26/89

09/26/89

0 09/26/89

09/26/89

80,756

100

814 06 0112 / 16327

13000 S INDIANA AVE

1.0

03/01/95

03/01/95

0 03/01/95

03/01/95

392,625

100

814 06 0252 / 16464

11100 S MICHIGAN AVE

1.0

08/10/89

08/10/89

0 08/10/89

08/10/89

80,756

100

Totals per TSM Install Totals per Traffic

8.0

409,500

1,579,074

542,429

1,711,515

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 101

1/1/2008 AND 12/31/2008

Ward 09 Anthony Beale CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 09 / 33075

ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE

7.0

09/05/08

09/12/08

2,600 09/05/08

09/12/08

2,324

100

300 09 / 33075

ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE

1.0

11/12/08

11/21/08

129 11/12/08

11/21/08

84

100

300 09 / 33075

ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE

5.0

09/02/08

09/10/08

2,200 09/02/08

09/05/08

1,610

100

Totals per Traffic Equipment Painting

13.0

4,929

4,018

Totals per Construction Phase

5,186,112

3,201,655

Totals for Ward 09

5,494,112

3,234,092

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 102

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0288 / 5395

TRUMBALL HOMES (CHA)

.0

09/01/04

12/31/04

0 09/01/04

1,465

100

300 06 / 32277

ON S AVENUE H FROM E 98TH ST TO E 99TH ST

1.0

04/01/08

08/30/08

65,000 04/26/08

0

70

300 06 / 32277

ON S AVENUE J FROM E 98TH ST TO E 99TH ST

1.0

04/01/08

08/30/08

65,000 04/26/08

0

70

300 06 / 32277

ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST

2.0

04/01/08

08/30/08

130,000 04/26/08

0

70

300 06 0308 / 5414

ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,608

100

300 06 0308 / 5414

ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,608

100

281 00 / 33670

10609 S AVENUE B

.0

01/01/08

12/31/08

0

300 06 / 32275

10700-10900 S HOXIE AVE

.0

03/01/07

10/31/07

Totals per Design/Engineering

4.0

3,900 02/12/07 263,900

12/31/04

03/12/07

0

0

2,790

100

7,471

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 103

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233

ON S EXCHANGE AVE FROM E 87TH ST TO E 91ST ST

300 06 0069 / 5233

3020 E 97TH ST

Totals per 250 Watt Changeout Totals per Lighting/Electrical

Fixtures 19.0

08/12/02

08/12/02

3,857 08/09/02

08/09/02

3,990

100

2.0

09/28/02

09/28/02

406 09/25/02

09/25/02

420

100

21.0

4,263

4,410

1,694,939

1,751,040

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 104

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0096 / 5258

3522 E 106TH ST

2,164.0

56,523 03/01/06

09/01/06

65,383

0

302 00 0092 / 5774

3522 E 106TH ST

85.0

0 01/04/01

01/11/02

20,030

100

302 00 0092 / 5774

3456 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

3501 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

3524 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

3525 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

3556 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

3557 E 112TH ST

1.0

0 03/27/01

03/27/01

236

100

302 00 0092 / 5774

9800 S AVENUE H

1.0

0 12/11/01

12/11/01

236

100

805 06 0869 / 7055

9716 S AVENUE J

1.0

11/01/95

11/01/95

0 11/01/95

11/01/95

300

100

805 06 0849 / 7035

9640 S BALTIMORE AVE

1.0

10/18/96

10/18/96

0 10/18/96

10/18/96

300

100

805 06 1756 / 7942

9640 S BALTIMORE AVE

1.0

05/01/97

05/01/97

0 05/01/97

05/01/97

300

100

805 06 1777 / 7963

13016 S BURLEY AVE

1.0

04/17/97

04/17/97

0 04/17/97

04/17/97

300

100

805 06 1663 / 7849

13036 S BURLEY AVE

1.0

08/06/97

08/06/97

0 08/06/97

08/06/97

300

100

302 00 0092 / 5774

8740 S COMMERCIAL AVE

1.0

0 03/19/01

03/19/01

236

100

805 06 1538 / 7724

9558 S COMMERCIAL AVE

1.0

01/21/97

01/21/97

0 01/21/97

01/21/97

300

100

805 06 1519 / 7705

9610 S COMMERCIAL AVE

1.0

01/21/97

01/21/97

0 01/21/97

01/21/97

300

100

805 06 1530 / 7716

9656 S COMMERCIAL AVE

1.0

01/21/97

01/21/97

0 01/21/97

01/21/97

300

100

302 00 0092 / 5774

10199 S COMMERCIAL AVE

1.0

0 01/09/02

01/09/02

236

100

302 00 0092 / 5774

10241 S COMMERCIAL AVE

1.0

0 06/08/01

06/08/01

236

100

302 00 0092 / 5774

10253 S COMMERCIAL AVE

1.0

0 04/30/01

04/30/01

236

100

805 06 0678 / 6864

12643 S ESCANABA AVE

1.0

09/13/95

09/13/95

0 09/13/95

09/13/95

300

100

805 06 0587 / 6773

10912 S EWING AVE

1.0

01/06/95

01/06/95

0 01/06/95

01/06/95

300

100

805 06 1209 / 7395

8326 S HOUSTON AVE

1.0

01/30/97

01/30/97

0 01/30/97

01/30/97

300

100

805 06 1797 / 7983

13200 S MACKINAW AVE

1.0

04/10/97

04/10/97

0 04/10/97

04/10/97

300

100

805 06 0429 / 6615

10457 S TORRENCE AVE

1.0

05/31/95

05/31/95

0 05/31/95

05/31/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

3522 E 106TH ST

03/01/03

09/01/03

2,273.0

56,523

91,909

Lamps 1,944.0

06/01/07

12/31/07

57,231 01/31/08

02/11/08

55,501

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 105

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

3522 E 106TH ST

Work Type: Flood Light Install

Installations 2,768.0

0 09/13/02

09/25/02

50,400

100

Fixtures

300 06 0198 / 5323

TRUMBALL HOMES (CHA)

300 09 / 33076

2510 E 106TH ST

1.0

302 00 0092 / 5774

2949 E 126TH ST

302 00 0092 / 5774

06/14/01

06/15/01

13,500 06/19/01

06/26/01

29,493

100

10/22/08

10/23/08

500 10/22/08

10/23/08

768

100

1.0

0 04/27/01

04/27/01

471

100

2955 E 126TH ST

1.0

0 04/27/01

04/27/01

471

100

302 00 0092 / 5774

3001 E 126TH ST

1.0

0 04/27/01

04/27/01

471

100

302 00 0092 / 5774

3011 E 126TH ST

1.0

0 04/27/01

04/27/01

471

100

302 00 0092 / 5774

3015 E 126TH ST

1.0

0 04/27/01

04/27/01

471

100

300 09 / 33076

2610 E 136TH ST

2.0

300 06 0071 / 5234

9801 S AVENUE G

302 00 0092 / 5774

9050 S BRANDON AVE

302 00 0092 / 5774

10/22/08

10/23/08

1,000 10/22/08

10/23/08

1,537

100

01/01/00

12/30/00

0 09/15/00

09/22/00

9,450

100

1.0

0 07/10/01

07/10/01

471

100

9058 S BRANDON AVE

1.0

0 07/10/01

07/10/01

471

100

302 00 0092 / 5774

9546 S EWING AVE

1.0

0 11/09/01

11/09/01

404

100

300 09 / 33076

13600 S TORRENCE AVE

1.0

500 10/22/08

10/23/08

768

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

10609 S AVENUE B

Work Type: Lighting Imprvmnts 300 06 0288 / 5395

TRUMBALL HOMES (CHA)

281 00 / 33670

10609 S AVENUE B

Totals per Lighting Imprvmnts

Work Type: Loop Lighting 281 00 / 33670

10609 S AVENUE B

Work Type: Ornamental Lighting 281 00 / 33670

10609 S AVENUE B

10/22/08

10/23/08

12.0

15,500

45,717

0

0

0

Blocks 01/01/08

12/31/08

116.0

03/01/05

12/31/07

.0

01/01/08

12/31/08

.0

Installations

116.0

600,000 12/17/04

12/20/04

457,687

100

0

0

0

600,000

457,687

Blocks .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

Blocks .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 106

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Poles

Work Type: POD Camera Pole 281 00 / 33670

10609 S AVENUE B

.0

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Lamps

Work Type: Residential Regrouping 300 06 0270 / 5378

01/01/08

3522 E 106TH ST

.0

Blocks

Work Type: Residntl Staggered Lighting 300 06 / 32277

ON S AVENUE H FROM E 98TH ST TO E 99TH ST

.0

05/04/08

12/31/08

0

0

0

300 06 / 32277

ON S AVENUE J FROM E 98TH ST TO E 99TH ST

.0

05/04/08

12/31/08

0

0

0

300 06 / 32277

ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST

.0

05/04/08

12/31/08

0

0

0

300 06 0298 / 5405

ON S BUFFALO AVE FROM E 108TH ST TO E 109TH ST

1.0

06/01/05

07/15/05

0 06/10/05

08/12/05

59,430

100

300 06 0298 / 5405

ON S MACKINAW AVE FROM E 108TH ST TO E 109TH ST

1.0

06/01/05

07/01/05

0 06/10/05

08/19/05

59,430

100

300 06 0308 / 5414

ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST

1.0

05/04/06

07/21/06

105,100 05/04/06

07/21/06

73,363

100

300 06 0308 / 5414

ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST

1.0

05/04/06

07/21/06

105,100 05/04/06

07/21/06

73,363

100

300 06 / 32275

Project has been completed as of 07/21/2006 Note Last Updated on 25-AUG-06 10700-10900 S HOXIE AVE

2.0

04/01/07

12/31/07

199,647 04/02/07

07/13/07

117,514

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

6.0

409,847

383,100

Blocks

300 06 0235 / 5349

ON S ESCANABA AVE FROM E 85TH ST TO E 87TH ST

2.0

04/15/03

06/15/03

166,811 04/14/03

05/16/03

150,606

100

300 06 0267 / 5375

ON S EXCHANGE AVE FROM E 85TH ST TO E 87TH ST

2.0

09/20/04

11/20/04

177,934 10/06/04

11/05/04

136,319

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

10609 S AVENUE B

Work Type: Short Arm Installs - Residntl 281 00 / 33670

10609 S AVENUE B

302 00 0092 / 5774

9059 S BURLEY AVE

Totals per Short Arm Installs - Residntl

4.0

344,745

286,925

0

Locations .0

01/01/08

12/31/08

0

01/01/08

12/31/08

0

0

Locations .0 1.0

0 06/13/01

1.0

0

06/13/01

0

0

378

100

378

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 107

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0117 / 5271

ON E 106TH ST FROM S AVENUE O TO S AVENUE H

14.0

04/14/00

05/01/00

5,000 04/14/00

300 07 0010 / 5433

ON E 91ST ST FROM S EXCHANGE AVE TO S HOUSTON AVE

11.0

04/18/06

11/18/06

2,750 09/09/06

09/15/06

3,682

100

300 07 0010 / 5433

ON E 92ND ST FROM S EXCHANGE AVE TO S HOUSTON AVE

14.0

04/18/06

11/18/06

3,500 09/09/06

09/15/06

4,687

100

300 07 0010 / 5433

ON S COMMERCIAL AVE FROM E 91ST ST TO S SOUTH CHICAGO AVE

15.0

04/18/06

11/18/06

3,750 09/09/06

09/15/06

5,021

100

300 06 0117 / 5271

ON S EWING AVE FROM E 104TH ST TO E 108TH ST

68.0

04/14/00

05/01/00

24,000 04/14/00

300 04 0216 / 5114

ON S EWING AVE FROM E 97TH ST TO E 99TH ST

28.0

05/01/06

11/01/06

6,056 05/17/06

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

10609 S AVENUE B

Work Type: Strt Lighting 300 06 0135 / 5288

ON E 106TH ST FROM S AVENUE O TO S AVENUE H

300 06 0246 / 5356

ON E 131ST ST FROM S MARQUETTE AVE TO S EXCHANGE AVE

300 06 0135 / 5288

ON S EWING AVE FROM E 104TH ST TO E 108TH ST

Work Type: Traffic Signal Regrouping 3522 E 106TH ST

0 05/30/06

6,056

100

45,056

19,446

0

0

0

Blocks .0

01/01/08

12/31/08

09/01/01

11/01/01

43,200 10/25/00

11/08/00

37,574

100

09/01/03

12/31/03

33,052 08/20/03

08/30/04

33,052

100

57,600 10/25/00

11/08/00

0

100

Blocks 3.0

4.0 7.0

Totals per Strt Lighting

300 06 0139 / 5289

150.0

0

133,852

70,626

Lamps 1,381.0

03/01/04

12/01/04

7,181 07/31/06

08/09/06

15,039

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 108

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0099 / 5260

3522 E 106TH ST

369.0

09/03/03

09/08/03

20,741 08/28/03

09/02/03

13,886

100

805 06 2611 / 8797

2695 E 95TH ST

10.0

03/03/95

03/03/95

0 03/03/95

03/03/95

7,500

100

805 06 2325 / 8511

3105 E 95TH ST

10.0

05/24/96

05/24/96

0 05/24/96

05/24/96

7,500

100

302 00 0070 / 5758

9950 S AVENUE L

0 06/12/97

06/19/97

22,706

100

805 06 2165 / 8351

9951 S AVENUE L

56.0

06/19/97

06/19/97

0 06/19/97

06/19/97

42,000

100

805 06 2478 / 8664

9895 S AVENUE M

38.0

10/10/95

10/10/95

0 10/10/95

10/10/95

28,500

100

805 06 2456 / 8642

9932 S AVENUE M

20.0

10/02/95

10/02/95

0 10/02/95

10/02/95

15,000

100

302 00 0071 / 5759

9940 S EWING AVE

0 02/09/99

02/15/99

7,759

100

302 00 0071 / 5759

9950 S EWING AVE

0 02/04/99

02/15/99

19,493

100

805 06 2453 / 8639

10001 S EWING AVE

20.0

03/05/91

03/05/91

0 03/05/91

03/05/91

15,000

100

805 06 2454 / 8640

10001 S EWING AVE

27.0

03/05/91

03/05/91

0 03/05/91

03/05/91

20,250

100

805 06 2455 / 8641

10004 S EWING AVE

8.0

03/05/91

03/05/91

0 03/05/91

03/05/91

6,000

100

805 06 2394 / 8580

9499 S MANISTEE AVE

70.0

12/08/95

12/08/95

0 12/08/95

12/08/95

52,500

100

302 00 0071 / 5759

12600 S MARQUETTE AVE

0 03/03/98

03/05/98

2,808

100

805 06 2828 / 9014

9499 S SOUTH CHICAGO AVE

0 04/07/94

04/07/94

9,000

100

Totals per Underpass Lighting

12.0 640.0

04/07/94

04/07/94

20,741

269,902

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 109

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S AVENUE O AND E 133RD ST

1.0

0 03/19/02

03/19/02

8,539

100

210 06 0130 / 4389

S AVENUE O AND E 134TH ST

1.0

0 03/05/02

03/05/02

8,539

100

210 06 0130 / 4389

S EWING AVE AND E 99TH ST

1.0

0 09/27/01

09/27/01

8,539

100

210 06 0130 / 4389

S SOUTH SHORE DR AND E 83RD ST

.50

0 10/23/01

10/23/01

4,270

100

210 06 0130 / 4389

S TORRENCE AVE AND E 130TH ST

1.0

0 05/16/02

05/16/02

1,850

100

Totals per LED Signal Head Install

Work Type: Removal Temp Wiring - Signals

4.50

0

31,737

Crossings

300 06 0197 / 5322

ON E 87TH ST FROM S BUFFALO AVE TO S BURLEY AVE

2.0

8,000 05/18/01

06/07/01

9,231

100

300 06 0197 / 5322

S COMMERCIAL AVE AND E 91ST ST

3.0

12,000 05/18/01

06/04/01

11,076

100

300 06 0197 / 5322

S COMMERCIAL AVE AND E 92ND ST

3.0

12,000 05/07/01

05/21/01

9,938

100

300 06 0197 / 5322

9360 S SOUTH CHICAGO AVE

3.0

2,800 05/11/01

05/21/01

2,800

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

3522 E 106TH ST

Work Type: TSM Install

11.0

34,800

33,045

Intersections 43.0

07/13/03

07/20/03

0 07/11/06

10/17/06

6,799

100

Locations

300 06 0195 / 5320

E 133RD ST AND S AVENUE O

1.0

12/01/01

11/15/02

200,000 12/11/01

10/16/02

146,517

100

300 06 0195 / 5320

E 134TH ST AND S AVENUE O

1.0

12/01/01

06/30/02

200,000 11/16/01

02/28/02

146,517

100

210 06 0075 / 4339

E 95TH ST AND S EWING AVE

04/01/04

06/01/04

249,000 03/18/04

06/18/04

234,815

100

814 06 0189 / 16401

2500 E 130TH ST

1.0

04/03/95

04/03/95

0 04/03/95

04/03/95

125,000

100

814 06 0071 / 16287

10000 S COMMERCIAL AVE

1.0

11/28/94

11/28/94

0 11/28/94

11/28/94

74,947

100

814 06 0234 / 16446

10599 S MUSKEGON AVE

1.0

01/01/89

01/01/89

0 01/01/89

01/01/89

90,000

100

814 06 0075 / 16291

12200 S TORRENCE AVE

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

126,636

100

6.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

649,000

944,432

Locations

300 07 0010 / 5433

ON E 91ST ST FROM S HOUSTON AVE TO S EXCHANGE AVE

13.0

04/18/06

11/18/06

6,600 09/09/06

09/15/06

4,352

100

300 07 0010 / 5433

ON E 92ND ST FROM S HOUSTON AVE TO S EXCHANGE AVE

13.0

04/18/06

11/18/06

6,680 09/09/06

09/15/06

4,352

100

Totals per Traffic Equipment Painting

26.0

13,280

8,704

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 110

1/1/2008 AND 12/31/2008

Ward 10 John Pope CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Traffic Totals per Traffic

697,080

1,024,717

Totals per Construction Phase

2,392,019

2,775,757

Totals for Ward 10

2,655,919

2,783,228

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 111

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD

.0

04/01/08

08/30/08

0

0

300 06 / 32277

ON W 43RD PL FROM S WALLACE ST TO S CANAL ST

.0

04/01/08

08/30/08

0

0

0

300 06 0292 / 5399

S DAMEN AVE AND W 33RD ST

300 06 0308 / 5414

W 46TH PL AND S WALLACE ST

.0

02/01/06

300 06 0292 / 5399

3700 S NORMAL AVE

1.0

01/14/05

300 06 0282 / 5390

470 W 26TH ST

1.0

10/20/04

300 06 0292 / 5399

1548 W 33RD ST

1.0

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

Totals per Design/Engineering

5,000 01/20/05

04/08/05

1,454

100

07/31/06

75,861 02/01/06

07/31/06

1,296

100

03/28/05

5,000 12/15/04

05/09/05

5,000

100

02/23/05

1,000 01/15/05

02/28/05

0

100

2,000 06/16/05

09/08/05

840

100

0

0

0

0

0

0

88,861

8,590

1.0

4.0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 112

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 09 / 33077

ON S LEAVITT ST FROM W 34TH ST TO W 35TH ST

4.0

08/25/08

08/25/08

1,600 08/25/08

08/25/08

1,158

100

300 06 0122 / 5275

ON W 47TH PL FROM S UNION AVE TO S HALSTED ST

3.0

07/01/03

07/02/03

1,305 06/17/03

06/18/03

676

100

300 06 0122 / 5275

ON W 48TH ST FROM S UNION AVE TO S HALSTED ST

4.0

07/01/03

07/02/03

1,740 06/17/03

06/18/03

901

100

300 06 0069 / 5233

3100 S BENSON ST

5.0

10/06/02

10/06/02

1,015 10/03/02

10/03/02

1,050

100

300 06 0122 / 5275

2900 S CANAL ST

7.0

05/10/03

05/12/03

2,825 05/01/03

05/01/03

1,195

100

300 06 0122 / 5275

3359 S HOYNE AVE

11/01/03

11/01/03

1,291 11/05/03

11/05/03

586

100

300 06 0069 / 5233

3733 S PAULINA ST

1.0

11/08/02

11/08/02

203 11/05/02

11/05/02

210

100

300 06 0069 / 5233

4400 S UNION AVE

3.0

05/12/02

05/12/02

609 05/09/02

05/09/02

630

100

300 06 0069 / 5233

4335 S WALLACE ST

1.0

01/26/03

01/26/03

203 01/23/03

01/23/03

210

100

300 06 0069 / 5233

1814 W 35TH ST

2.0

01/31/03

01/31/03

406 01/30/03

01/30/03

420

100

300 06 0069 / 5233

1644 W 37TH PL

1.0

11/08/02

11/08/02

203 11/05/02

11/05/02

210

100

300 06 0122 / 5275

1900 W 38TH ST

2.0

06/02/03

06/03/03

950 05/06/03

05/06/03

225

100

300 06 0122 / 5275

1936 W 38TH ST

1.0

05/04/03

05/04/03

375 05/01/03

05/01/03

119

100

300 06 0122 / 5275

1944 W 38TH ST

1.0

05/04/03

05/04/03

375 05/01/03

05/01/03

119

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

35.0

13,100

7,709

Fixtures

300 06 0225 / 5340

ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST

06/05/03

06/13/03

5,000 06/05/03

06/13/03

9,026

100

300 06 0225 / 5340

ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE

06/05/03

06/13/03

7,500 06/05/03

06/13/03

11,905

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

12,500

20,931

3,852,550

4,201,250

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 113

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0727 / 6913

3217 S ARCHER AVE

1.0

03/28/96

03/28/96

0 03/28/96

03/28/96

300

100

805 06 0708 / 6894

3272 S ARCHER AVE

1.0

01/08/97

01/08/97

0 01/08/97

01/08/97

300

100

805 06 0743 / 6929

4325 S EMERALD AVE

1.0

09/17/96

09/17/96

0 09/17/96

09/17/96

300

100

805 06 0724 / 6910

4532 S EMERALD AVE

1.0

08/19/96

08/19/96

0 08/19/96

08/19/96

300

100

805 06 0735 / 6921

4640 S EMERALD AVE

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

805 06 1068 / 7254

3624 S HALSTED ST

1.0

03/22/96

03/22/96

0 03/22/96

03/22/96

300

100

300 06 0139 / 5289

3659 S HALSTED ST

1,527.0

03/01/06

09/01/06

33,308 02/15/06

03/01/06

46,137

100

302 00 0092 / 5774

3659 S HALSTED ST

41.0

0 01/29/01

01/25/02

9,662

100

805 06 0353 / 6539

3620 S LEAVITT ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 1832 / 8018

2707 S LOWE AVE

1.0

01/04/96

01/04/96

0 01/04/96

01/04/96

300

100

805 06 1850 / 8036

2820 S LOWE AVE

1.0

01/06/95

01/06/95

0 01/06/95

01/06/95

300

100

805 06 1871 / 8057

4534 S LOWE AVE

1.0

07/06/95

07/06/95

0 07/06/95

07/06/95

300

100

805 06 1958 / 8144

3601 S MORGAN ST

1.0

09/17/96

09/17/96

0 09/17/96

09/17/96

300

100

805 06 1959 / 8145

3611 S MORGAN ST

1.0

09/17/96

09/17/96

0 09/17/96

09/17/96

300

100

805 06 1960 / 8146

3619 S MORGAN ST

1.0

09/17/96

09/17/96

0 09/17/96

09/17/96

300

100

805 06 0609 / 6795

2914 S PARNELL AVE

1.0

02/03/97

02/03/97

0 02/03/97

02/03/97

300

100

805 06 1730 / 7916

2934 S PARNELL AVE

1.0

05/29/97

05/29/97

0 05/29/97

05/29/97

300

100

805 06 0610 / 6796

3045 S PARNELL AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0611 / 6797

3839 S PARNELL AVE

1.0

07/17/96

07/17/96

0 07/17/96

07/17/96

300

100

805 06 1677 / 7863

2702 S PRINCETON AVE

1.0

07/28/97

07/28/97

0 07/28/97

07/28/97

300

100

805 06 0581 / 6767

3236 S PRINCETON AVE

1.0

06/19/95

06/19/95

0 06/19/95

06/19/95

300

100

805 06 0569 / 6755

2741 S QUINN ST

1.0

06/17/96

06/17/96

0 06/17/96

06/17/96

300

100

805 06 0672 / 6858

2640 S SHIELDS AVE

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

805 06 0650 / 6836

2743 S SHIELDS AVE

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1630 / 7816

2912 S SHIELDS AVE

1.0

09/18/97

09/18/97

0 09/18/97

09/18/97

300

100

805 06 1554 / 7740

3638 S UNION AVE

1.0

10/15/97

10/15/97

0 10/15/97

10/15/97

300

100

805 06 1764 / 7950

3817 S UNION AVE

1.0

05/13/97

05/13/97

0 05/13/97

05/13/97

300

100

805 06 1459 / 7645

4639 S WALLACE ST

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 0538 / 6724

2855 S WELLS ST

1.0

07/24/95

07/24/95

0 07/24/95

07/24/95

300

100

805 06 0539 / 6725

3023 S WENTWORTH AVE

1.0

12/13/96

12/13/96

0 12/13/96

12/13/96

300

100

805 06 0921 / 7107

333 W 25TH PL

1.0

12/13/95

12/13/95

0 12/13/95

12/13/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 114

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0937 / 7123

340 W 26TH ST

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

805 06 0912 / 7098

344 W 26TH ST

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

805 06 1741 / 7927

630 W 26TH ST

1.0

05/15/97

05/15/97

0 05/15/97

05/15/97

300

100

805 06 0913 / 7099

312 W 27TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

302 00 0092 / 5774

324 W 27TH ST

1.0

0 05/03/01

05/03/01

236

100

805 06 0914 / 7100

333 W 27TH ST

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

805 06 0915 / 7101

343 W 27TH ST

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

805 06 0886 / 7072

848 W 27TH ST

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 0888 / 7074

323 W 28TH PL

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 0872 / 7058

345 W 28TH PL

1.0

08/16/95

08/16/95

0 08/16/95

08/16/95

300

100

805 06 0890 / 7076

353 W 28TH PL

1.0

08/16/95

08/16/95

0 08/16/95

08/16/95

300

100

805 06 0911 / 7097

334 W 29TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1525 / 7711

1300 W 32ND PL

1.0

11/05/97

11/05/97

0 11/05/97

11/05/97

300

100

805 06 1769 / 7955

1240 W 32ND ST

1.0

05/15/97

05/15/97

0 05/15/97

05/15/97

300

100

805 06 0926 / 7112

525 W 45TH ST

1.0

02/07/97

02/07/97

0 02/07/97

02/07/97

300

100

805 06 0928 / 7114

527 W 46TH ST

1.0

04/18/95

04/18/95

0 04/18/95

04/18/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

3659 S HALSTED ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

3659 S HALSTED ST

1,613.0

33,308

69,235

Lamps 2,064.0

06/01/07

12/31/07

60,764 09/01/07

10/26/07

60,764

100

0 07/15/02

07/18/02

35,488

100

Installations 1,949.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 115

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 06 0198 / 5323

BRIDGE PORT HOMES (CHA)

10,750 06/01/01

06/01/01

15,675

100

302 00 0092 / 5774

S BONFIELD ST AND W 31ST ST

1.0

0 05/14/01

05/14/01

471

100

300 06 0069 / 5233

3401 S CLAREMONT AVE

3.0

1,455 11/13/02

11/13/02

1,300

100

300 06 0167 / 5306

3706 S UNION AVE

1.0

0 01/17/99

01/17/99

351

100

302 00 0092 / 5774

3020 S WALLACE ST

1.0

0 05/08/01

05/08/01

471

100

302 00 0092 / 5774

3032 S WALLACE ST

1.0

0 05/08/01

05/08/01

471

100

302 00 0092 / 5774

244 W 33RD ST

2.0

0 09/10/01

09/10/01

689

100

300 06 0071 / 5234

2210 W PERSHING RD

0 09/13/00

09/14/00

5,400

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

06/08/01

01/01/00

06/09/01

12/30/00

9.0

12,205

24,828

Blocks

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts

.0

Installations

300 06 0292 / 5399

1548 W 33RD ST

.0

03/01/05

12/31/05

0 03/01/05

281 00 / 33670

Operations project Note Last Updated on 01-NOV-07 911 W 37TH ST

.0

01/01/08

12/31/08

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts 300 06 0199 / 5324

ON S EMERALD AVE FROM W 35TH ST TO W 37TH ST

Work Type: Loop Lighting

.0

12/31/05

0

0

0

0

0

0

0

0

0

0

Projects 1.0

07/01/01

12/01/01

185,721 06/04/01

08/22/01

153,368

100

Blocks

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Loop Lighting

.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 116

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting

Blocks

300 06 0156 / 5296

ON W 26TH ST FROM S NORMAL AVE TO S HALSTED ST

3.0

11/01/01

08/30/02

14,000 11/29/01

05/13/02

91,995

100

300 06 0156 / 5296

ON W 35TH ST FROM S NORMAL AVE TO S MORGAN ST

6.0

08/01/01

02/15/02

294,500 09/04/01

12/14/01

229,272

100

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

308,500

321,267

Totals per Ornamental Lighting

Work Type: POD Camera Pole

9.0

Poles

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

0

0

0

0

0

Totals per POD Camera Pole

Work Type: Residential Regrouping 300 06 0270 / 5378

3659 S HALSTED ST

Work Type: Residntl Staggered Lighting

.0

Lamps .0

03/01/08

12/01/08

Blocks

300 05 0011 / 5126

ON S ARCHER AVE FROM S LOOMIS ST TO S PITNEY CT

3.0

04/04/05

11/18/05

210,000 11/07/05

03/10/06

192,236

100

300 05 0011 / 5126

ON S CANAL ST FROM W 29TH ST TO W 31ST ST

2.0

04/04/05

11/18/05

170,000 10/10/05

11/30/05

105,431

100

300 05 0011 / 5126

ON S EMERALD AVE FROM W 45TH ST TO W 47TH ST

2.0

04/04/05

11/18/05

170,000 10/10/05

11/30/05

128,603

100

300 06 / 32277

ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON S SEELEY AVE FROM W 35TH ST TO W 37TH ST

2.0

06/20/05

07/30/05

0 07/06/05

300 07 0011 / 5434

ON S UNION AVE FROM W 31ST ST TO W 33RD ST

2.0

05/01/07

07/01/07

170,000 11/15/06

300 09 / 33077

ON S WALLACE ST FROM W 43RD ST TO W 44TH ST

1.0

300 06 / 32277

ON W 43RD PL FROM S WALLACE ST TO S CANAL ST

300 09 / 33077

ON W 43RD PL FROM S WALLACE ST TO S HALSTED ST

1.0

300 05 0011 / 5126

ON W 46TH ST FROM S STEWART AVE TO S UNION AVE

1.0

04/04/05

300 06 0308 / 5414

W 46TH PL AND S WALLACE ST

1.0

05/16/06

.0

65,000 04/01/08 05/04/08

12/31/08

08/19/05

12/01/08

0

0

0

115,086

100

111,582

95

0

0

0

0

65,000 04/01/08

12/01/08

0

0

11/18/05

85,000 09/08/05

11/11/05

50,929

100

08/01/06

75,861 05/16/06

08/01/06

66,683

100

project has been completed as of 08/01/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting

15.0

1,010,861

770,550

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 117

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 03 0011 / 4882

ON S LOWE AVE FROM W 31ST ST TO W 35TH ST

4.0

12/01/04

02/01/05

250,000 12/01/04

03/01/05

198,962

100

300 06 0122 / 5275

ON S LOWE AVE FROM W 35TH ST TO W 37TH ST

2.0

12/15/03

03/01/04

150,000 12/01/03

04/19/04

220,920

100

300 06 0069 / 5233

ON S LOWE AVE FROM W 44TH ST TO W 46TH ST

2.0

09/15/02

11/15/02

165,000 09/13/02

01/15/03

131,500

100

300 06 0069 / 5233

ON S NORMAL BLVD FROM W 29TH ST TO W 31ST ST

2.0

03/01/03

05/15/03

180,000 02/18/03

03/31/03

143,865

100

300 06 0122 / 5275

ON S PARNELL AVE FROM W 29TH ST TO W 31ST ST

2.0

12/01/03

02/15/04

161,000 11/11/03

04/19/04

182,881

100

300 06 0235 / 5349

ON S UNION AVE FROM W 33RD ST TO W 35TH ST

2.0

05/01/03

07/01/03

159,067 05/08/03

07/11/03

133,390

100

300 06 0069 / 5233

ON S UNION AVE FROM W 35TH ST TO W 37TH ST

2.0

02/01/03

04/15/03

185,000 02/10/03

03/19/03

171,317

100

300 06 0122 / 5275

ON S WELLS ST FROM W 31ST ST TO W 33RD ST

2.0

12/15/03

03/01/04

150,000 11/17/03

04/05/04

160,286

100

300 03 0011 / 4882

ON W 34TH PL FROM S WOOD ST TO S DAMEN AVE

2.0

10/15/04

12/15/04

160,000 08/05/04

09/16/04

135,651

100

300 06 0069 / 5233

ON W 44TH ST FROM S CANAL ST TO S UNION AVE

2.0

08/19/02

10/01/02

195,000 08/19/02

01/08/03

152,620

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial

22.0

1,755,067

1,631,392

Locations

302 00 0092 / 5774

3001 S PARNELL AVE

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

3013 S PARNELL AVE

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

3026 S PARNELL AVE

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

3043 S PARNELL AVE

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

3059 S PARNELL AVE

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

4800 S UNION AVE

1.0

0 03/26/01

03/26/01

378

100

302 00 0092 / 5774

4808 S UNION AVE

1.0

0 03/26/01

03/26/01

378

100

281 00 / 33670

911 W 37TH ST

302 00 0092 / 5774

1643 W 38TH PL

281 00 / 33670

1313 W FULLER ST

Totals per Short Arm Installs - Arterial

.0

01/01/08

12/31/08

8.0

0

0

378

100

0

0

0

0

3,024

0 04/20/01

1.0 .0

0

01/01/08

12/31/08

04/20/01

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 118

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

3445 S HERMITAGE AVE

1.0

0 05/15/01

05/15/01

378

100

302 00 0092 / 5774

3449 S HERMITAGE AVE

1.0

0 05/15/01

05/15/01

378

100

302 00 0092 / 5774

3450 S HERMITAGE AVE

1.0

0 05/15/01

05/15/01

378

100

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

0

1,134

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

3.0

Locations

302 00 0076 / 5764

ON S SHIELDS AVE FROM W 28TH PL TO W 31ST ST

04/09/98

04/09/98

0 04/09/98

04/09/98

221

100

300 06 0225 / 5340

ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST

05/30/03

06/17/03

3,625 05/30/03

06/17/03

5,285

100

300 06 0225 / 5340

ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE

05/30/03

06/17/03

5,250 05/30/03

06/17/03

3,780

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc

13.0

13.0

8,875

9,286

Blocks

281 00 / 33670

911 W 37TH ST

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

1313 W FULLER ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Strt Lighting 300 06 0261 / 5369

ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE

300 06 0246 / 5356

ON W 41ST ST FROM S HALSTED ST TO S WALLACE ST

300 06 0247 / 5357

700 W 46TH PL

Blocks 3.50

.25

04/01/04

06/30/04

314,566 01/22/04

08/03/04

250,781

100

08/01/03

11/30/03

23,274 07/18/03

10/14/03

23,274

100

06/16/03

06/30/03

32,500 06/12/03

08/05/03

32,201

100

3.75

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

.0

3659 S HALSTED ST

370,340

306,256

Lamps 2,806.0

03/01/04

12/01/04

14,591 07/31/06

09/19/06

30,557

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 119

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2609 / 8795

2495 S ARCHER AVE

24.0

10/09/91

10/09/91

0 10/09/91

10/09/91

18,000

100

805 06 2313 / 8499

3099 S ASHLAND AVE

26.0

01/01/91

01/01/91

0 01/01/91

01/01/91

19,500

100

805 06 2335 / 8521

3905 S ASHLAND AVE

18.0

12/31/91

12/31/91

0 12/31/91

12/31/91

13,500

100

805 06 2724 / 8910

2599 S CORBETT ST

20.0

01/14/91

01/14/91

0 01/14/91

01/14/91

15,000

100

805 06 2292 / 8478

3398 S DAMEN AVE

8.0

01/01/91

01/01/91

0 01/01/91

01/01/91

6,000

100

805 06 2688 / 8874

3399 S DAMEN AVE

14.0

08/16/91

08/16/91

0 08/16/91

08/16/91

10,500

100

805 06 2388 / 8574

3901 S EMERALD AVE

14.0

01/01/90

01/01/90

0 01/01/90

01/01/90

10,500

100

302 00 0071 / 5759

4000 S EMERALD AVE

0 09/07/98

09/14/98

12,802

100

300 06 0099 / 5260

3659 S HALSTED ST

1,187.0

09/09/03

09/24/03

66,718 09/03/03

09/15/03

49,190

100

805 06 2259 / 8445

3901 S HALSTED ST

34.0

12/13/96

12/13/96

0 12/13/96

12/13/96

25,500

100

805 06 2334 / 8520

3901 S HALSTED ST

12.0

01/01/91

01/01/91

0 01/01/91

01/01/91

9,000

100

805 06 2673 / 8859

3499 S HOYNE AVE

10.0

09/20/91

09/20/91

0 09/20/91

09/20/91

7,500

100

805 06 2768 / 8954

3595 S LEAVITT ST

10.0

10/02/91

10/02/91

0 10/02/91

10/02/91

7,500

100

805 06 2272 / 8458

3605 S LEAVITT ST

4.0

01/01/91

01/01/91

0 01/01/91

01/01/91

3,000

100

302 00 0071 / 5759

2820 S LOOMIS ST

0 02/20/99

02/25/99

7,115

100

805 06 2410 / 8596

3900 S NORMAL AVE

0 01/01/90

01/01/90

11,250

100

302 00 0071 / 5759

4000 S NORMAL AVE

0 02/24/99

03/05/99

16,487

100

805 06 2409 / 8595

3901 S UNION AVE

0 01/01/90

01/01/90

10,500

100

302 00 0071 / 5759

4000 S UNION AVE

0 02/26/99

03/05/99

14,813

100

805 06 2411 / 8597

3901 S WALLACE ST

10.0

0 01/01/90

01/01/90

7,500

100

302 00 0072 / 5760

4000 S WALLACE ST

1.0

0 02/21/00

02/25/00

9,600

100

805 06 2867 / 9053

3605 S WESTERN BLVD

7.0

0 01/01/91

01/01/91

5,250

100

302 00 0071 / 5759

400 W 25TH PL

0 06/12/98

06/23/98

20,920

100

805 06 2835 / 9021

135 W 26TH ST

0 10/13/93

10/13/93

6,000

100

302 00 0071 / 5759

400 W 26TH ST

0 05/25/98

06/07/98

41,745

100

805 06 2284 / 8470

401 W 26TH ST

34.0

03/20/94

03/20/94

0 03/20/94

03/20/94

25,500

100

805 06 2283 / 8469

401 W 28TH ST

86.0

06/14/96

06/14/96

0 06/14/96

06/14/96

64,500

100

805 06 2840 / 9026

138 W 29TH ST

8.0

10/07/93

10/07/93

0 10/07/93

10/07/93

6,000

100

805 06 2857 / 9043

405 W 29TH ST

34.0

11/19/93

11/19/93

0 11/19/93

11/19/93

25,500

100

805 06 2148 / 8334

1729 W 31ST PL

5.0

01/01/91

01/01/91

0 01/01/91

01/01/91

3,750

100

805 06 2692 / 8878

125 W 31ST ST

10.0

04/22/94

04/22/94

0 04/22/94

04/22/94

7,500

100

15.0

14.0

8.0

01/01/90

01/01/90

01/01/90

01/01/91

10/13/93

01/01/90

01/01/90

01/01/90

01/01/91

10/13/93

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 120

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2858 / 9044

401 W 32ND ST

54.0

05/01/91

05/01/91

0 05/01/91

05/01/91

40,500

100

805 06 2709 / 8895

1899 W 33RD ST

10.0

07/24/91

07/24/91

0 07/24/91

07/24/91

7,500

100

805 06 2818 / 9004

2001 W 34TH ST

10.0

08/23/91

08/23/91

0 08/23/91

08/23/91

7,500

100

302 00 0071 / 5759

400 W 35TH ST

0 02/24/98

03/12/98

40,902

100

805 06 2860 / 9046

401 W 35TH ST

56.0

06/12/92

06/12/92

0 06/12/92

06/12/92

42,000

100

805 06 2772 / 8958

2101 W 35TH ST

10.0

09/24/91

09/24/91

0 09/24/91

09/24/91

7,500

100

302 00 0071 / 5759

2140 W 35TH ST

0 09/03/98

09/08/98

11,638

100

805 06 2757 / 8943

2301 W 36TH ST

8.0

09/24/91

09/24/91

0 09/24/91

09/24/91

6,000

100

805 06 2861 / 9047

401 W 37TH ST

36.0

12/31/91

12/31/91

0 12/31/91

12/31/91

27,000

100

805 06 2862 / 9048

401 W 38TH ST

34.0

03/01/91

03/01/91

0 03/01/91

03/01/91

25,500

100

805 06 2836 / 9022

498 W 42ND PL

22.0

08/01/91

08/01/91

0 08/01/91

08/01/91

16,500

100

805 06 2739 / 8925

1331 W FULLER ST

18.0

03/01/91

03/01/91

0 03/01/91

03/01/91

13,500

100

805 06 2424 / 8610

405 W PERSHING RD

24.0

12/01/93

12/01/93

0 12/01/93

12/01/93

18,000

100

Totals per Underpass Lighting

1,895.0

66,718

755,462

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 121

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S ARCHER AVE AND S ASHLAND AVE

1.0

210 06 0219 / 4459

S ARCHER AVE AND S DAMEN AVE

1.0

210 06 0130 / 4389

S ARCHER AVE AND S HALSTED ST

1.0

0 01/15/02

01/18/02

13,974

100

210 06 0130 / 4389

S ARCHER AVE AND S THROOP ST

1.0

0 09/05/01

09/05/01

8,539

100

210 06 0130 / 4389

S ARCHER AVE AND S WOOD ST

1.0

0 01/17/02

01/17/02

8,539

100

210 06 0130 / 4389

S CANAL ST AND W 26TH ST

1.0

0 05/07/02

05/07/02

8,539

100

210 06 0130 / 4389

S LA SALLE ST AND W 31ST ST

1.0

0 04/10/02

04/10/02

7,078

100

210 06 0130 / 4389

S LOCK ST AND S ARCHER AVE

1.0

0 09/04/01

09/04/01

8,539

100

210 06 0130 / 4389

S UNION AVE AND W 26TH ST

1.0

0 05/08/02

05/08/02

6,867

100

210 06 0130 / 4389

S WALLACE ST AND W 26TH ST

1.0

0 05/15/02

05/15/02

8,539

100

210 06 0130 / 4389

S WALLACE ST AND W 31ST ST

1.0

0 01/31/02

01/31/02

15,228

100

210 06 0130 / 4389

S WENTWORTH AVE AND W 31ST ST

1.0

0 04/10/02

04/10/02

7,078

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

0 01/14/02 04/11/05

04/11/05

12.0

01/14/02

10,563

9,507

100

0

10,563

102,427

Locations

210 06 0127 / 4386

S HALSTED ST AND W PERSHING RD

.0

10/01/07

12/31/07

85,000

101,236

50

210 06 0171 / 4420

W 35TH ST AND S DAMEN AVE

.0

03/01/07

12/31/07

0

0

0

85,000

101,236

Totals per Left Turn Arrow

Work Type: New Signal 300 06 0283 / 5391

S HALSTED ST AND W 31ST ST

Work Type: Removal Temp Wiring - Signals

.0

Locations 1.0

09/02/04

09/30/04

03/20/01

04/20/01

11,341 09/09/04

09/09/04

11,341

100

8,000 06/05/01

06/06/01

3,590

100

4,000 03/22/01

04/06/01

6,489

100

4,000 04/12/01

04/08/02

180

100

Crossings

300 06 0197 / 5322

S DAMEN AVE AND W 37TH ST

2.0

300 06 0197 / 5322

S HALSTED ST AND W 43RD ST

1.0

300 06 0197 / 5322

S UNION AVE AND W ROOT ST

1.0

300 06 0197 / 5322

W 26TH ST AND S HALSTED ST

1.0

03/20/01

04/20/01

4,000 03/20/01

04/10/01

7,700

100

300 06 0197 / 5322

W 26TH ST AND S WENTWORTH AVE

1.0

04/20/01

04/26/01

4,000 04/20/01

04/26/01

2,672

100

Totals per Removal Temp Wiring - Signals Totals per Traffic

6.0

24,000

20,631

446,404

926,059

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 122

1/1/2008 AND 12/31/2008

Ward 11 James A. Balcer CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Signals 300 06 0096 / 5258

3659 S HALSTED ST

Work Type: TSM Install

Intersections 72.0

08/19/03

08/26/03

0 09/08/03

11/10/03

11,385

100

Locations

210 06 0025 / 4299

3600 S ARCHER AVE

1.0

08/01/98

10/01/98

150,000 11/11/98

02/03/99

131,974

100

814 06 0168 / 16380

3100 S EMERALD AVE

1.0

08/12/97

10/22/97

0 08/12/97

10/22/97

200,000

100

814 06 0089 / 16305

2500 S HALSTED ST

1.0

12/07/93

12/07/93

0 12/07/93

12/07/93

47,111

100

814 06 0058 / 16274

3000 S HALSTED ST

1.0

04/03/95

04/03/95

0 04/03/95

04/03/95

150,729

100

210 06 0057 / 4324

3400 S HALSTED ST

1.0

11/15/98

12/31/98

150,000 12/16/98

02/25/99

88,789

100

210 06 0074 / 4338

600 W 26TH ST

1.0

05/01/02

08/01/02

15,500 04/12/02

05/17/02

60,436

100

Totals per TSM Install

6.0

315,500

679,039

Totals per Construction Phase

4,298,954

5,127,309

Totals for Ward 11

4,387,815

5,135,899

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 123

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32456

LAWNDALE GARDENS

300 06 / 32146

Additional lighting on California side due to wide parkway-sidewalk. It will be a continuation of lighting north of 25th Street Note Last Updated on 11-FEB-08 ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR 05/01/07 10/31/07 16,000 08/17/07 1.0

300 09 / 33078

ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD

.0

01/01/08

05/30/08

0 04/01/08

300 06 0308 / 5414

ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST

.0

02/01/06

07/31/06

300 06 / 32129

ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

.0

11/27/06

02/14/07

300 06 / 32277

ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE

.0

04/01/08

08/30/08

300 06 0292 / 5399

W 38TH ST AND S ARCHER AVE

300 09 / 33078

3819 S CAMPBELL AVE

.0

01/01/08

300 06 0282 / 5390

3030 S KEDZIE AVE

1.0

09/03/04

300 06 0292 / 5399

4555 S WESTERN BLVD

1.0

300 06 0292 / 5399

2320 W 47TH ST

1.0

04/22/05

04/26/05

Totals per Design/Engineering

Work Type: Feasibility Study 302 00 0079 / 5767

ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE

Totals per Lighting/Electrical

.0

04/02/07

03/12/08

30,000 01/07/08

0

5

09/26/07

5,200

100

12/01/08

0

0

0 02/01/06

07/31/06

2,315

100

3,700 11/27/06

02/14/07

2,414

100

0

0

0

0

100

1,000 05/12/05

05/13/05

05/30/08

0 04/01/08

12/01/08

0

0

10/22/04

1,000 10/01/04

10/22/04

1,488

100

3,500 05/26/05

08/10/05

3,361

100

2,000 04/22/05

04/26/05

1,749

100

1.0

5.0

57,200

16,527

Projects .0

10/25/01

10/25/01

0 10/25/01 57,200

10/25/01

0 16,527

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 124

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 03 0012 / 4883

ON S ALBANY AVE FROM W 24TH ST TO W 25TH ST

10.0

10/01/04

10/10/04

3,905 10/08/04

10/19/04

2,236

100

300 06 0122 / 5275

ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD

9.20

08/01/04

08/15/04

3,634 06/14/04

06/22/04

2,505

100

300 06 0069 / 5233

ON S CALIFORNIA AVE FROM W 43RD ST TO W 47TH ST

60.0

10/04/02

10/22/02

24,000 10/01/02

10/18/02

12,463

100

300 06 0069 / 5233

ON S CAMPBELL AVE FROM W 40TH ST TO W 42ND ST

12.0

07/18/02

07/18/02

2,520 07/15/02

07/15/02

2,436

100

300 11 / 32201

ON S FAIRFIELD AVE FROM W 42ND ST TO W 44TH ST

13.0

11/01/07

11/20/07

5,200 10/11/07

10/11/07

2,500

100

300 06 0122 / 5275

ON S FAIRFIELD AVE FROM W 45TH ST TO W 47TH ST

03/13/03

03/13/03

2,940 03/10/03

03/10/03

2,940

100

300 06 0122 / 5275

ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD

3.0

08/01/04

08/15/04

1,125 06/15/04

06/21/04

919

100

300 06 0122 / 5275

ON S HOMAN AVE FROM W 37TH ST TO W PERSHING RD

9.0

08/01/04

08/15/04

3,375 06/15/04

06/21/04

2,502

100

300 06 0122 / 5275

ON S HOYNE AVE FROM W 47TH ST TO W 49TH ST

10.0

03/14/03

03/14/03

2,030 03/11/03

03/11/03

2,100

100

300 11 / 32201

ON S MAPLEWOOD AVE FROM W 40TH ST TO W 44TH ST

25.0

11/01/07

11/20/07

10,400 10/11/07

10/11/07

2,500

100

300 06 0069 / 5233

ON S MOZART ST FROM W 43RD ST TO W 47TH ST

30.0

10/04/02

10/22/02

12,000 10/01/02

10/18/02

6,232

100

300 06 0122 / 5275

ON S MOZART ST FROM W 45TH ST TO W 47TH ST

4.50

03/15/03

03/15/03

914 03/12/03

03/12/03

945

100

300 06 0122 / 5275

ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST

8.0

03/15/03

03/15/03

1,624 03/12/03

03/12/03

1,680

100

300 11 / 32201

ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST

29.0

11/01/07

11/15/07

12,000 10/04/07

10/12/07

12,000

100

300 03 0012 / 4883

ON S SACRAMENTO AVE FROM W 24TH ST TO W 25TH ST

10.0

10/01/04

10/10/04

3,910 10/08/04

10/19/04

2,237

100

300 06 0122 / 5275

ON S SPAULDING AVE FROM W 37TH PL TO W 38TH ST

3.0

06/21/04

06/25/04

1,125 06/15/04

06/21/04

1,172

100

300 11 / 32201

ON S TALMAN AVE FROM W 42ND ST TO W 44TH ST

12.0

11/01/07

11/15/07

4,800 10/11/07

10/11/07

2,500

100

300 06 0122 / 5275

ON S TALMAN AVE FROM W 45TH ST TO W 47TH ST

9.0

03/15/03

03/15/03

1,827 03/12/03

03/12/03

1,890

100

300 03 0012 / 4883

ON S TROY ST FROM W 24TH ST TO W 25TH ST

2.50

10/01/04

10/10/04

975 10/08/04

10/19/04

559

100

300 06 0122 / 5275

ON S WASHTENAW AVE FROM W 45TH ST TO W 47TH ST

9.0

03/15/03

03/15/03

1,827 03/12/03

03/12/03

1,890

100

300 03 0012 / 4883

ON S WHIPPLE ST FROM W 24TH ST TO W 25TH ST

5.0

10/01/04

10/10/04

1,950 10/08/04

10/19/04

1,118

100

300 03 0012 / 4883

ON W 24TH ST FROM S TROY ST TO S MARSHALL BLVD

5.0

10/01/04

10/10/04

1,950 10/08/04

10/19/04

1,117

100

300 03 0012 / 4883

ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE

4.15

10/01/04

10/10/04

1,619 10/08/04

10/19/04

928

100

300 06 0122 / 5275

ON W 36TH PL FROM S FRANCISCO AVE TO S ALBANY AVE

9.0

08/01/04

08/15/04

3,375 06/15/04

06/21/04

2,502

100

300 06 0122 / 5275

ON W 36TH ST FROM S FRANCISCO AVE TO S ALBANY AVE

15.0

08/01/04

08/15/04

6,025 06/15/04

06/21/04

3,832

100

300 06 0122 / 5275

ON W 38TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE

9.0

08/01/04

08/15/04

3,375 06/15/04

06/21/04

2,502

100

300 06 0069 / 5233

3000 S ALBANY AVE

2.0

04/08/02

04/08/02

420 04/05/02

04/05/02

406

100

300 06 0122 / 5275

3301 S BELL AVE

2.0

11/01/03

11/01/03

862 11/05/03

11/05/03

400

100

300 06 0069 / 5233

4200-4259 S CAMPBELL AVE

5.0

0 07/15/02

07/15/02

1,875

100

300 06 0122 / 5275

3301 S CLAREMONT AVE

2.0

10/25/03

10/25/03

862 11/05/03

11/05/03

400

100

300 06 0122 / 5275

3301 S HAMILTON AVE

3.0

11/01/03

11/01/03

1,291 11/05/03

11/05/03

586

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 125

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

4501 S HERMITAGE AVE

2.0

300 06 0122 / 5275

3359 S LEAVITT ST

3.0

302 00 0092 / 5774

4401 S MARSHFIELD AVE

2.0

300 06 0122 / 5275

3300 S OAKLEY AVE

6.0

11/01/03

300 06 0122 / 5275

3359 S OAKLEY AVE

2.0

302 00 0092 / 5774

4124 S ROCKWELL ST

300 06 0122 / 5275

0 02/23/01

02/23/01

413

100

1,291 11/05/03

11/05/03

587

100

0 02/23/01

02/23/01

413

100

11/01/03

1,260 02/20/03

02/20/03

1,218

100

11/01/03

11/01/03

862 11/05/03

11/05/03

400

100

1.0

10/06/01

10/06/01

206 09/29/01

09/29/01

206

100

3301 S WESTERN AVE

3.0

11/01/03

11/01/03

1,291 11/05/03

11/05/03

400

100

300 06 0122 / 5275

2800 W 21ST PL

6.0

03/15/03

03/15/03

1,218 03/12/03

03/12/03

1,260

100

300 06 0122 / 5275

2800 W 25TH ST

2.0

03/28/03

03/28/03

406 03/25/03

03/25/03

420

100

300 06 0122 / 5275

2400 W 34TH PL

5.0

03/15/03

03/15/03

1,015 03/12/03

03/12/03

1,050

100

300 06 0122 / 5275

2400 W 34TH ST

6.0

03/14/03

03/14/03

1,260 03/11/03

03/11/03

1,218

100

300 06 0069 / 5233

3500 W 38TH PL

5.0

10/12/02

10/12/02

1,050 10/09/02

10/09/02

1,015

100

300 06 0122 / 5275

1700 W 45TH ST

3.0

02/23/03

02/23/03

630 03/20/03

03/20/03

609

100

302 00 0092 / 5774

2605-2639 W MONTGOMERY AVE

4.0

10/06/01

10/06/01

824 09/29/01

09/29/01

824

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

11/01/03

11/01/03

379.35

133,172

89,904

Fixtures

300 05 0012 / 5127

ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST

68.0

04/04/05

11/18/05

27,200

300 05 0012 / 5127

ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD

65.0

04/04/05

11/18/05

26,000 06/01/05

06/20/05

14,990

100

300 06 0122 / 5275

ON S KEDZIE AVE FROM W 36TH ST TO W PERSHING RD

36.0

06/21/04

06/25/04

14,400 06/15/04

06/21/04

7,472

100

300 07 0012 / 5435

ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST

54.0

11/15/06

11/29/06

21,600 10/20/06

11/09/06

10,908

100

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

47.52

05/10/04

06/10/04

19,008 05/01/04

05/11/04

18,321

100

302 00 0092 / 5774

ON W 47TH ST FROM S WESTERN AVE TO S ROCKWELL ST

14.0

03/14/02

03/14/02

5,600 03/11/02

03/11/02

5,250

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

284.52

0

113,808

56,941

2,551,954

2,132,614

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 126

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0709 / 6895

3959 S ARCHER AVE

1.0

03/13/95

03/13/95

0 03/13/95

03/13/95

300

100

805 06 1549 / 7735

4136 S ARTESIAN AVE

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 0798 / 6984

4011 S BRIGHTON PL

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 0800 / 6986

3759 S CALIFORNIA AVE

1.0

05/24/96

05/24/96

0 05/24/96

05/24/96

300

100

805 06 0801 / 6987

3821 S CALIFORNIA AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 0802 / 6988

4133 S CALIFORNIA AVE

1.0

04/16/96

04/16/96

0 04/16/96

04/16/96

300

100

805 06 1883 / 8069

3641 S MAPLEWOOD AVE

1.0

07/29/96

07/29/96

0 07/29/96

07/29/96

300

100

805 06 1953 / 8139

4053 S MONTGOMERY AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0669 / 6855

4014 S ROCKWELL ST

1.0

03/17/95

03/17/95

0 03/17/95

03/17/95

300

100

805 06 0699 / 6885

4030 S ROCKWELL ST

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0696 / 6882

4108 S ROCKWELL ST

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 0687 / 6873

4118 S ROCKWELL ST

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 1708 / 7894

3748 S SACRAMENTO AVE

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

805 06 0486 / 6672

3502 S WASHTENAW AVE

1.0

08/22/95

08/22/95

0 08/22/95

08/22/95

300

100

805 06 0504 / 6690

3734 S WASHTENAW AVE

1.0

10/17/95

10/17/95

0 10/17/95

10/17/95

300

100

805 06 0383 / 6569

3739 S WASHTENAW AVE

1.0

05/24/96

05/24/96

0 05/24/96

05/24/96

300

100

805 06 0525 / 6711

3801 S WASHTENAW AVE

1.0

05/24/96

05/24/96

0 05/24/96

05/24/96

300

100

805 06 0506 / 6692

3824 S WASHTENAW AVE

1.0

03/19/96

03/19/96

0 03/19/96

03/19/96

300

100

300 06 0139 / 5289

4650 S WESTERN AVE

933.0

03/01/06

09/01/06

23,522 02/15/06

03/01/06

28,190

100

805 06 0520 / 6706

4722 S WESTERN AVE

1.0

01/18/95

01/18/95

0 01/18/95

01/18/95

300

100

805 06 0966 / 7152

3126 W 26TH ST

1.0

11/03/95

11/03/95

0 11/03/95

11/03/95

300

100

805 06 1767 / 7953

2731 W 35TH PL

1.0

05/14/97

05/14/97

0 05/14/97

05/14/97

300

100

805 06 0892 / 7078

2642 W 36TH ST

1.0

10/17/95

10/17/95

0 10/17/95

10/17/95

300

100

805 06 0894 / 7080

2717 W 38TH PL

1.0

01/24/96

01/24/96

0 01/24/96

01/24/96

300

100

805 06 0895 / 7081

2745 W 38TH PL

1.0

01/24/96

01/24/96

0 01/24/96

01/24/96

300

100

805 06 0893 / 7079

2856 W 38TH PL

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

302 00 0092 / 5774

2456 W 38TH ST

38.0

0 02/20/01

12/13/01

8,955

100

805 06 0899 / 7085

2622 W 38TH ST

1.0

03/19/96

03/19/96

0 03/19/96

03/19/96

300

100

805 06 0900 / 7086

2825 W 38TH ST

1.0

01/24/96

01/24/96

0 01/24/96

01/24/96

300

100

805 06 1707 / 7893

3014 W 38TH ST

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

805 06 0871 / 7057

2631 W 39TH PL

1.0

03/17/95

03/17/95

0 03/17/95

03/17/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 127

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0891 / 7077

2705 W 39TH PL

1.0

03/17/95

03/17/95

0 03/17/95

03/17/95

300

100

805 06 0929 / 7115

2716 W 39TH PL

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 0889 / 7075

2640 W 42ND ST

1.0

09/14/95

09/14/95

0 09/14/95

09/14/95

300

100

805 06 0922 / 7108

2642 W 42ND ST

1.0

10/09/96

10/09/96

0 10/09/96

10/09/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

2458 W 38TH ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2456 W 38TH ST

Work Type: Flood Light Install

1,004.0

23,522

47,045

Lamps 1,738.0

06/01/07

12/31/07

51,166 09/01/07

10/04/07

49,619

100

0 06/27/02

06/30/02

29,916

100

Installations 1,643.0

Fixtures

300 06 0069 / 5233

ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

3.75

1,406 06/24/02

06/24/02

1,406

100

300 06 0167 / 5306

ON W 45TH ST FROM S WESTERN AVE TO S ROCKWELL ST

17.0

0 05/19/99

05/19/99

3,008

100

302 00 0092 / 5774

S DAMEN AVE AND W 48TH ST

.50

0 09/25/01

09/25/01

202

100

300 11 / 32201

3823 S CALIFORNIA AVE

1.0

500 10/10/07

10/10/07

507

100

300 06 0167 / 5306

3800 S SACRAMENTO AVE

1.0

0 12/08/99

12/08/99

351

100

300 06 0167 / 5306

3542 S WASHTENAW AVE

1.0

0 01/09/99

01/09/99

351

100

300 11 / 32201

3843 S WASHTENAW AVE

1.0

500 10/10/07

10/10/07

507

100

300 06 0167 / 5306

2700 W 38TH PL

1.0

0 12/08/99

12/08/99

351

100

300 11 / 32201

2809 W 38TH PL

1.0

11/10/07

11/11/07

500 10/10/07

10/10/07

507

100

300 11 / 32201

2813 W 38TH PL

1.0

11/10/07

11/11/07

500 10/10/07

10/10/07

507

100

300 11 / 32201

2814 W 38TH PL

1.0

11/10/07

11/11/07

500 10/10/07

10/10/07

507

100

300 06 0167 / 5306

3000 W 38TH PL

1.0

0 12/08/99

12/08/99

351

100

Totals per Flood Light Install

30.25

11/01/07

11/01/07

11/10/07

11/10/07

3,906

8,555

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 128

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts

Installations

300 06 0292 / 5399

4555 S WESTERN BLVD

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

Not issued Note Last Updated on 01-NOV-07 2320 W 47TH ST

.0

03/01/05

12/31/05

19,586 09/20/05

09/20/05

175,200

100

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts

.0

19,586

Projects

300 06 / 32456

LAWNDALE GARDENS

.0

04/02/07

12/31/08

300 06 0282 / 5390

3030 S KEDZIE AVE

.0

10/06/04

10/31/04

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

175,200

.0

300,000 5,800 10/27/04

10/27/04

305,800

0

0

5,709

100

5,709

Fixtures

300 05 0012 / 5127

ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST

50.0

04/04/05

11/18/05

67,500

300 05 0012 / 5127

ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD

57.0

04/04/05

11/18/05

76,950 06/01/05

06/28/05

73,801

100

300 06 0069 / 5233

ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE

29.0

12/20/02

01/09/03

36,250 12/28/02

02/28/03

35,049

100

300 07 0012 / 5435

ON W 26TH ST FROM S ROCKWELL ST TO S KEDZIE AVE

54.0

11/15/06

11/29/06

72,900 10/20/06

11/09/06

57,212

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 300 09 / 33090

ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD

Work Type: Residential Regrouping 300 06 0270 / 5378

2458 W 38TH ST

190.0

0

253,600

166,062

Blocks 50,000 04/01/08

.50

12/01/08

0

0

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 129

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Staggered Lighting 300 06 / 32146

ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR

4.0

12/05/07

06/26/08

336,375

0

25

300 07 0012 / 5435

ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 25TH ST

1.0

10/01/06

12/01/06

100,000 07/19/06

09/28/06

0

100

300 11 / 32201

ON S CAMPBELL AVE FROM W 42ND ST TO W POPE JOHN PAUL II DR

1.0

06/28/07

09/21/07

75,000 06/28/07

09/07/07

60,317

100

300 11 / 32201

ON S CAMPBELL AVE FROM W PERSHING RD TO W 40TH ST

1.0

06/28/07

09/21/07

75,000 06/28/07

09/07/07

60,317

100

300 11 / 32201

ON S MARSHALL BLVD FROM W CERMAK RD TO W 23RD ST

3.0

05/17/07

05/21/07

30,000 05/17/07

05/23/07

4,509

100

300 07 0014 / 5437

ON S MOZART ST FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 06 0308 / 5414

ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST

2.0

07/07/06

09/01/06

152,756 07/24/06

10/06/06

106,951

100

300 06 / 32129

ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

2.0

02/15/07

05/31/07

184,280 02/15/07

05/31/07

112,252

100

300 06 / 32277

ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE

.0

05/04/08

12/31/08

300 11 / 32201

ON W 39TH PL FROM S CAMPBELL AVE TO S ROCKWELL ST

1.0

06/28/07

09/21/07

300 07 0011 / 5434

2415 W 46TH PL

.0

03/01/06

12/31/06

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON S SEELEY AVE FROM W 47TH ST TO W 49TH ST

Work Type: Short Arm Installs - Arterial

15.0

0

0

0

36,740

100

0

0

0

1,013,411

381,086

60,000 06/28/07

09/07/07

Blocks 2.0

08/01/03

10/01/03

147,124 07/29/03

10/03/03

131,010

100

Locations

302 00 0092 / 5774

4330 S HERMITAGE AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4317 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4439 S MARSHFIELD AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4317 S PAULINA ST

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

2433 W 45TH PL

1.0

0 03/16/01

03/16/01

378

100

302 00 0092 / 5774

2461 W 45TH PL

1.0

0 03/16/01

03/16/01

378

100

6.0

0

Totals per Short Arm Installs - Arterial

2,268

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 130

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 05 0012 / 5127

ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD

57.0

04/04/05

11/18/05

14,250 10/20/05

10/20/05

12,001

100

300 03 0012 / 4883

ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL

39.56

07/01/04

07/20/04

10,406 07/10/04

08/01/04

8,991

100

300 04 0216 / 5114

ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST

15.50

05/01/06

11/01/06

3,317 05/17/06

10/01/06

3,317

100

300 07 0012 / 5435

ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST

54.0

11/17/05

04/03/06

13,500 05/20/06

06/01/06

9,428

100

302 00 0077 / 5765

ON W 42ND ST FROM S TALMAN AVE TO S FAIRFIELD AVE

0 06/17/99

06/17/99

175

100

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

300 04 0216 / 5114

ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD

302 00 0079 / 5767

ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE

302 00 0077 / 5765

4037 S ARCHER AVE

302 00 0076 / 5764

3700-6700 S CALIFORNIA AVE

302 00 0077 / 5765

2825 W 42ND ST

1.0

0 06/16/99

06/16/99

87

100

302 00 0077 / 5765

2700 W PERSHING RD

4.0

0 07/27/99

07/27/99

349

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 03 0012 / 4883

ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

51.48

06/01/04

06/21/04

13,580 05/11/04

06/30/04

14,609

100

16.0

05/01/06

11/01/06

3,461 05/17/06

08/30/06

3,461

100

39.06

09/01/02

09/03/02

4,898 09/09/02

10/23/02

4,898

100

0 06/17/99

06/17/99

87

100

1.0 237.0

4650 S WESTERN AVE

09/01/00

12/31/00

517.60

0

4,029

63,411

61,431

Blocks

2400 S MARSHALL BLVD

Work Type: Strt Lighting 300 06 0261 / 5369

2.0

11/01/04

11/10/04

5,000 03/17/05

03/17/05

0

100

04/01/04

06/30/04

314,566 01/22/04

08/03/04

250,781

100

03/01/04

12/01/04

9,308 07/31/06

09/21/06

19,493

100

Blocks 3.50

Lamps 1,790.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 131

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

302 00 0072 / 5760

4050 S ASHLAND AVE

0 02/25/00

03/15/00

14,456

100

805 06 2163 / 8349

3101 S CALIFORNIA AVE

16.0

06/18/93

06/18/93

0 06/18/93

06/18/93

12,000

100

805 06 2490 / 8676

3495 S CALIFORNIA AVE

6.0

12/19/95

12/19/95

0 12/19/95

12/19/95

4,500

100

805 06 2491 / 8677

3299 S KEDZIE AVE

4.0

10/20/95

10/20/95

0 10/20/95

10/20/95

3,000

100

805 06 2785 / 8971

1901 S MARSHALL BLVD

10.0

04/05/93

04/05/93

0 04/05/93

04/05/93

7,500

100

805 06 2518 / 8704

3631 S ROCKWELL ST

4.0

12/08/92

12/08/92

0 12/08/92

12/08/92

3,000

100

302 00 0071 / 5759

3700 S ROCKWELL ST

0 02/06/99

02/11/99

10,473

100

805 06 2813 / 8999

3631 S WASHTENAW AVE

0 04/25/94

04/25/94

7,500

100

302 00 0070 / 5758

3120 S WESTERN AVE

0 01/03/98

01/15/98

14,044

100

302 00 0070 / 5758

3140 S WESTERN AVE

0 01/03/98

01/15/98

12,751

100

805 06 2156 / 8342

3199 S WESTERN AVE

8.0

12/31/91

12/31/91

0 12/31/91

12/31/91

6,000

100

805 06 2145 / 8331

3200 S WESTERN AVE

8.0

12/31/91

12/31/91

0 12/31/91

12/31/91

6,000

100

805 06 2425 / 8611

3301 S WESTERN AVE

48.0

12/31/91

12/31/91

0 12/31/91

12/31/91

36,000

100

302 00 0072 / 5760

3650 S WESTERN AVE

1.0

0 02/29/00

03/08/00

10,000

100

302 00 0071 / 5759

3900 S WESTERN AVE

0 05/10/99

07/01/99

113,750

100

805 06 2190 / 8376

3901 S WESTERN AVE

14.0

12/31/95

12/31/95

0 12/31/95

12/31/95

10,500

100

805 06 2959 / 9145

3901 S WESTERN AVE

34.0

10/16/91

10/16/91

0 10/16/91

10/16/91

25,500

100

805 06 2960 / 9146

3901 S WESTERN AVE

14.0

10/16/91

10/16/91

0 10/16/91

10/16/91

10,500

100

805 06 2294 / 8480

4901 S WESTERN AVE

5.0

01/01/91

01/01/91

0 01/01/91

01/01/91

3,750

100

302 00 0070 / 5758

3130 S WESTERN BLVD

0 01/03/98

01/15/98

13,738

100

302 00 0072 / 5760

3640 S WESTERN BLVD

0 02/21/00

02/29/00

10,000

100

302 00 0071 / 5759

3900 S WESTERN BLVD

0 06/15/99

07/01/99

66,940

100

805 06 2953 / 9139

2505 W 26TH ST

14.0

03/20/94

03/20/94

0 03/20/94

03/20/94

10,500

100

805 06 2954 / 9140

2505 W 26TH ST

26.0

03/20/94

03/20/94

0 03/20/94

03/20/94

19,500

100

805 06 2181 / 8367

2400 W 31ST BLVD

4.0

04/02/93

04/02/93

0 04/02/93

04/02/93

3,000

100

805 06 2214 / 8400

2400 W 31ST BLVD

8.0

04/06/93

04/06/93

0 04/06/93

04/06/93

6,000

100

302 00 0070 / 5758

2500 W 31ST ST

0 01/28/98

02/05/98

16,290

100

302 00 0070 / 5758

2520 W 31ST ST

0 01/08/98

01/15/98

3,270

100

805 06 2517 / 8703

2431 W 36TH ST

12.0

01/01/91

01/01/91

0 01/01/91

01/01/91

9,000

100

300 06 0099 / 5260

2456 W 38TH ST

793.0

09/25/03

10/06/03

44,574 09/16/03

09/23/03

29,982

100

805 06 2447 / 8633

3505 W 38TH ST

12.0

05/14/93

05/14/93

0 05/14/93

05/14/93

9,000

100

1.0

10.0

04/25/94

04/25/94

1.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 132

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2458 / 8644

2399 W 43RD ST

13.0

11/14/95

11/14/95

0 11/14/95

11/14/95

9,750

100

805 06 2475 / 8661

2399 W 43RD ST

27.0

11/14/95

11/14/95

0 11/14/95

11/14/95

20,250

100

805 06 2588 / 8774

2295 W 47TH ST

26.0

05/12/95

05/12/95

0 05/12/95

05/12/95

19,500

100

805 06 2389 / 8575

1605 W PERSHING RD

48.0

11/02/95

11/02/95

0 11/02/95

11/02/95

36,000

100

805 06 2383 / 8569

2027 W PERSHING RD

25.0

08/15/95

08/15/95

0 08/15/95

08/15/95

18,750

100

805 06 2188 / 8374

2399 W PERSHING RD

22.0

12/31/95

12/31/95

0 12/31/95

12/31/95

16,500

100

805 06 2191 / 8377

2399 W PERSHING RD

10.0

12/31/95

12/31/95

0 12/31/95

12/31/95

7,500

100

302 00 0071 / 5759

2400 W PERSHING RD

0 06/17/99

07/01/99

20,900

100

Totals per Underpass Lighting

1,224.0

44,574

657,594

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 133

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

ON W 43RD ST FROM S WESTERN AVE TO S WESTERN BLVD

2.0

0 09/19/02

09/19/02

12,095

100

210 06 0130 / 4389

ON W 47TH ST FROM S WESTERN AVE TO S WESTERN BLVD

2.0

0 09/17/02

09/17/02

17,806

100

210 06 0130 / 4389

S CALIFORNIA AVE AND W 42ND ST

.50

0 08/27/01

08/27/01

3,662

100

210 06 0219 / 4459

S WESTERN AVE AND S ARCHER AVE

1.0

05/09/05

05/10/05

10,563 03/17/05

03/17/05

8,008

100

210 06 0219 / 4459

S WESTERN AVE AND W 35TH ST

1.0

05/06/05

05/07/05

10,563 04/22/05

04/22/05

7,883

100

210 06 0219 / 4459

S WESTERN AVE AND W 44TH ST

1.0

04/13/05

04/13/05

10,563 04/08/05

04/08/05

8,937

100

210 06 0219 / 4459

S WESTERN AVE AND W 45TH ST

1.0

05/10/05

05/11/05

10,563 04/21/05

04/21/05

8,007

100

Totals per LED Signal Head Install

Work Type: New Signal 210 06 0075 / 4339

W 31ST ST AND S SACRAMENTO AVE

210 06 0139 / 4397

3600 S CALIFORNIA AVE

Work Type: Removal Temp Wiring - Signals W 28TH ST AND S KEDZIE AVE

Work Type: Signals 300 06 0096 / 5258

42,252

2829 W CERMAK RD

Work Type: TSM Install

66,398

Locations 1.0

10/01/04

12/01/04

185,500 07/19/04

09/08/04

140,683

100

07/01/03

08/25/03

200,000 06/02/03

08/21/03

188,311

100

1.0

Totals per New Signal

300 06 0197 / 5322

8.50

385,500

328,994

Crossings .50

2,000 06/19/01

08/01/01

153

100

Intersections 44.0

09/01/03

09/07/03

0 09/02/03

09/09/03

6,957

100

Locations

814 06 0072 / 16288

2599 S ALBANY AVE

1.0

02/10/95

02/10/95

0 02/10/95

02/10/95

101,827

100

814 06 0164 / 16376

4300 S ASHLAND AVE

1.0

06/06/97

08/18/97

0 06/06/97

08/18/97

200,000

100

814 06 0392 / 16580

2500 S CALIFORNIA AVE

1.0

03/01/96

03/01/96

0 03/01/96

03/01/96

125,000

100

814 06 0393 / 16581

2500 S CALIFORNIA BLVD

1.0

03/01/96

03/01/96

0 03/01/96

03/01/96

125,000

100

814 06 0085 / 16301

4700 S HOYNE AVE

1.0

03/01/90

03/01/90

0 03/01/90

03/01/90

141,561

100

814 06 0191 / 16403

4700 S ROCKWELL ST

1.0

08/18/95

08/18/95

0 08/18/95

08/18/95

125,000

100

814 06 0188 / 16400

2600 W 31ST ST

1.0

03/22/95

03/22/95

0 03/22/95

03/22/95

125,000

100

Totals per TSM Install Totals per Traffic

7.0

0

943,388

438,252

1,352,436

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 134

1/1/2008 AND 12/31/2008

Ward 12 George A. Cardenas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 05 0012 / 5127

ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD

13.0

04/04/05

11/18/05

5,300 10/20/05

10/20/05

4,799

100

300 07 0012 / 5435

ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST

10.0

11/17/05

04/03/06

3,200 05/20/06

06/01/06

1,747

100

23.0

8,500

6,546

Totals per Construction Phase

2,990,206

3,485,050

Totals for Ward 12

3,047,406

3,501,577

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 135

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32969

ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST

300 06 / 32146

ON S KEELER AVE FROM W 59TH ST TO W 63RD ST

300 06 0308 / 5414 300 06 / 32050

Projects .0

10/17/07

11/30/07

1.0

05/01/07

10/31/07

ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST

.0

02/01/06

ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE

.0

04/15/06

300 06 / 32050

ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD

.0

210 06 0127 / 4386

S KILDARE AVE AND W MARQUETTE RD

210 06 0127 / 4386

0

0

0

4,811

100

07/31/06

958

100

04/15/06

4,519

100

10/26/06

3,620

100

3,900 06/21/07

07/19/07

07/31/06

0 02/01/06

04/15/06

6,000 04/15/06

04/15/06

04/15/06

5,400 11/02/06

.0

12/15/05

03/15/06

W 55TH ST AND S KILBOURN AVE

.50

11/01/06

11/20/06

2,500 01/17/07

300 06 0296 / 5403

W 63RD PL AND S PULASKI RD

1.0

01/20/05

12/21/05

0 01/20/05

210 06 0187 / 4432

W 63RD ST AND S LATROBE AVE

.50

11/15/03

02/15/04

0 11/15/03

300 06 0292 / 5399

6255 S AUSTIN AVE

1.0

300 06 / 32275

6300-6500 S KEELER AVE

.0

03/01/07

300 06 / 32050

6500-6700 S KEELER AVE

.0

300 06 / 32050

4000 W 70TH ST

.0

Totals per Design/Engineering

4.0

0

0

0

1,593

15

12/21/05

780

100

02/15/04

2,063

100

1,000 12/10/04

02/22/05

603

100

10/31/07

3,900 01/30/07

02/27/07

2,520

100

04/15/06

10/31/06

0 04/15/06

10/31/06

1,999

100

04/15/06

10/31/06

0 04/15/06

07/07/06

1,807

100

22,700

25,273

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 136

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

6500 S PULASKI RD

694,780 07/01/02

10/11/02

554,387

100

302 00 0092 / 5774

3800-3899 W 63RD PL

4.0

0 09/25/01

09/25/01

823

100

302 00 0092 / 5774

3900-3999 W 63RD PL

5.0

0 09/25/01

09/25/01

1,029

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

2,081.0

07/01/02

2,090.0

694,780

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

300 06 0069 / 5233

ON S PULASKI RD FROM W 55TH ST TO W 83RD ST

300 06 0122 / 5275

ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE

70.0

07/10/03

300 06 0069 / 5233

ON W 63RD ST FROM S LAWNDALE AVE TO S KARLOV AVE

88.0

10/01/02

300 06 / 33438

6200-6300 S CENTRAL AVE

11.0

06/30/08

Totals per Lighting/Electrical

556,239

Fixtures

300 11 / 32202

Totals per 400 Watt Changeout

10/31/02

30.15

12/01/07

01/01/08

12,060 11/28/07

02/15/08

10,755

100

3.75

05/27/08

06/05/08

1,500 09/22/08

10/24/08

1,500

100

98,000 08/02/02

08/23/02

49,240

100

22,940 07/07/03

07/28/03

15,210

100

33,000 08/02/02

08/23/02

16,685

100

4,400 08/25/08

08/26/08

4,400

100

245.0

447.90

07/15/03

07/25/08

171,900

97,790

5,753,878

3,798,371

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 137

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1401 / 7587

6525 S KARLOV AVE

1.0

02/24/95

02/24/95

0 02/24/95

02/24/95

300

100

805 06 1283 / 7469

6699 S KEATING AVE

1.0

05/10/95

05/10/95

0 05/10/95

05/10/95

300

100

805 06 1264 / 7450

7842 S KEATING AVE

1.0

02/20/95

02/20/95

0 02/20/95

02/20/95

300

100

805 06 1141 / 7327

5543 S KEELER AVE

1.0

10/02/96

10/02/96

0 10/02/96

10/02/96

300

100

805 06 1143 / 7329

6424 S KEELER AVE

1.0

02/14/96

02/14/96

0 02/14/96

02/14/96

300

100

805 06 1144 / 7330

6557 S KEELER AVE

1.0

02/24/95

02/24/95

0 02/24/95

02/24/95

300

100

805 06 1145 / 7331

6619 S KEELER AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 1157 / 7343

6141 S KENNETH AVE

1.0

08/02/95

08/02/95

0 08/02/95

08/02/95

300

100

805 06 1175 / 7361

6402 S KENNETH AVE

1.0

02/22/95

02/22/95

0 02/22/95

02/22/95

300

100

805 06 1195 / 7381

7721 S KENTON AVE

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 1177 / 7363

7747 S KENTON AVE

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 1178 / 7364

7822 S KENTON AVE

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 1179 / 7365

7831 S KENTON AVE

1.0

03/12/95

03/12/95

0 03/12/95

03/12/95

300

100

805 06 1181 / 7367

7843 S KENTON AVE

1.0

03/28/95

03/28/95

0 03/28/95

03/28/95

300

100

805 06 2027 / 8213

6300 S KILBOURN AVE

1.0

02/07/96

02/07/96

0 02/07/96

02/07/96

300

100

805 06 1528 / 7714

6837 S KILDARE AVE

1.0

11/07/97

11/07/97

0 11/07/97

11/07/97

300

100

805 06 2012 / 8198

7705 S KILPATRICK AVE

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 2013 / 8199

7820 S KILPATRICK AVE

1.0

10/04/96

10/04/96

0 10/04/96

10/04/96

300

100

805 06 1997 / 8183

6657 S KOLIN AVE

1.0

03/20/97

03/20/97

0 03/20/97

03/20/97

300

100

805 06 2020 / 8206

6035 S KOLMAR AVE

1.0

06/17/96

06/17/96

0 06/17/96

06/17/96

300

100

805 06 2023 / 8209

7759 S KOLMAR AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0310 / 6496

6315 S LAMON AVE

1.0

07/25/96

07/25/96

0 07/25/96

07/25/96

300

100

805 06 0317 / 6503

6345 S LATROBE AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0301 / 6487

6365 S LATROBE AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0349 / 6535

6338 S LECLAIRE AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0360 / 6546

6360 S LECLAIRE AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 1977 / 8163

6223 S MONITOR AVE

1.0

06/17/96

06/17/96

0 06/17/96

06/17/96

300

100

300 06 0139 / 5289

6500 S PULASKI RD

1,907.0

03/01/06

09/01/06

43,964 06/01/06

06/21/06

57,618

100

302 00 0092 / 5774

6500 S PULASKI RD

29.0

0 01/09/01

01/25/02

6,834

100

302 00 0092 / 5774

6719 S PULASKI RD

1.0

0 10/09/01

10/09/01

236

100

302 00 0092 / 5774

6735 S PULASKI RD

1.0

0 10/09/01

10/09/01

236

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 138

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0092 / 5774

6857 S PULASKI RD

1.0

0 10/15/01

10/15/01

236

100

805 06 1032 / 7218

4551 W 55TH ST

1.0

12/15/95

12/15/95

0 12/15/95

12/15/95

300

100

805 06 1033 / 7219

4551 W 55TH ST

1.0

10/05/95

10/05/95

0 10/05/95

10/05/95

300

100

805 06 1009 / 7195

3721 W 61ST PL

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1038 / 7224

3721 W 61ST ST

1.0

03/23/95

03/23/95

0 03/23/95

03/23/95

300

100

805 06 1058 / 7244

5133 W 63RD PL

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 1039 / 7225

5157 W 63RD PL

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 1040 / 7226

5201 W 63RD PL

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 1201 / 7387

3800 W 63RD ST

1.0

12/16/97

12/16/97

0 12/16/97

12/16/97

300

100

805 06 1761 / 7947

4610 W 63RD ST

1.0

05/09/97

05/09/97

0 05/09/97

05/09/97

300

100

805 06 1046 / 7232

5632 W 63RD ST

1.0

05/05/95

05/05/95

0 05/05/95

05/05/95

300

100

805 06 1003 / 7189

5124 W 64TH ST

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0984 / 7170

5160 W 64TH ST

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0985 / 7171

5200 W 64TH ST

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0986 / 7172

5220 W 64TH ST

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0990 / 7176

4548 W 66TH PL

1.0

04/28/95

04/28/95

0 04/28/95

04/28/95

300

100

805 06 0962 / 7148

3616 W 66TH ST

1.0

03/06/97

03/06/97

0 03/06/97

03/06/97

300

100

805 06 1545 / 7731

3801 W 68TH PL

1.0

10/29/97

10/29/97

0 10/29/97

10/29/97

300

100

805 06 1643 / 7829

4458 W 77TH PL

1.0

08/28/97

08/28/97

0 08/28/97

08/28/97

300

100

805 06 0996 / 7182

4548 W 77TH PL

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 1498 / 7684

4349 W 78TH ST

1.0

11/14/97

11/14/97

0 11/14/97

11/14/97

300

100

805 06 1499 / 7685

4357 W 78TH ST

1.0

11/14/97

11/14/97

0 11/14/97

11/14/97

300

100

805 06 0778 / 6964

4526 W 83RD ST

1.0

07/19/96

07/19/96

0 07/19/96

07/19/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

6500 S PULASKI RD

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

6500 S PULASKI RD

1,988.0

43,964

79,860

Lamps 1,661.0

06/01/07

12/31/07

48,899 12/18/07

12/29/07

47,421

100

0 07/18/02

07/21/02

28,514

100

Installations 1,566.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 139

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 06 0167 / 5306

W 56TH PL AND S KARLOV AVE

4.0

0 12/08/99

12/08/99

1,404

100

300 06 0167 / 5306

W 63RD ST AND S LAWNDALE AVE

7.0

0 12/03/99

12/03/99

1,291

100

300 06 0167 / 5306

W 83RD ST AND S KOSTNER AVE

6.0

0 07/22/99

07/22/99

1,523

100

300 06 0167 / 5306

W 83RD ST AND S SCOTTSDALE AVE

3.0

0 12/02/99

12/02/99

470

100

300 06 0167 / 5306

6900-7000 S HAMLIN AVE

3.0

0 05/22/99

05/22/99

1,053

100

300 06 0167 / 5306

6425 S KILBOURN AVE

3.0

0 04/14/99

04/14/99

1,053

100

302 00 0092 / 5774

4130 W 61ST ST

1.0

0 07/23/01

07/23/01

471

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

6255 S AUSTIN AVE

Work Type: Ornamental - Piggyback Lighting

27.0

0

7,265

Installations .0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

Fixtures

300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

28.81

12/01/07

01/01/08

38,894 11/28/07

02/15/08

34,572

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

3.75

07/28/08

08/08/08

5,063 09/22/08

10/24/08

3,930

100

300 09 / 33079

ON W 59TH ST FROM S PULASKI RD TO S KOLMAR AVE

45.0

07/28/08

08/15/08

61,350 09/22/08

10/24/08

47,157

100

300 05 0013 / 5128

ON W 63RD ST FROM S PARKSIDE AVE TO S AUSTIN AVE

20.0

12/20/06

12/21/06

2,800 12/20/06

12/21/06

0

100

300 09 / 33079

ON W MARQUETTE RD FROM S PULASKI RD TO S KOLMAR AVE

45.0

07/28/08

08/15/08

61,350 09/22/08

10/24/08

47,156

100

300 06 / 33438

6200-6300 S CENTRAL AVE

7.0

07/21/08

08/08/08

9,450 09/02/08

09/05/08

7,447

100

300 06 / 33439

6300-6500 S CICERO AVE

15.0

07/07/08

07/25/08

20,000 08/11/08

08/22/08

15,957

100

300 06 / 33440

5500-7000 S PULASKI RD

236.0

07/14/08

08/29/08

380,000 08/04/08

09/19/08

244,699

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

6500 S PULASKI RD

400.56

578,906

400,918

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 140

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0014 / 5437

ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL

0

0

300 09 / 33079

ON S KARLOV AVE FROM W 63RD ST TO W MARQUETTE RD

4.0

260,000 04/01/08

12/01/08

0

0

300 09 / 33079

ON S KEDVALE AVE FROM W 63RD ST TO W 65TH ST

2.0

130,000 04/01/08

12/01/08

0

0

300 11 / 32202

ON S KEDVALE AVE FROM W 65TH ST TO W MARQUETTE RD

2.0

08/30/07

10/26/07

110,000 08/30/07

10/26/07

0

100

300 06 / 32146

ON S KEELER AVE FROM W 59TH ST TO W 63RD ST

4.0

12/05/07

06/23/08

319,274

0

75

300 06 0308 / 5414

ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST

2.0

04/10/06

06/09/06

169,820 04/07/06

06/01/06

99,038

100

300 07 0013 / 5436

ON S KILDARE AVE FROM W 65TH ST TO W MARQUETTE RD

2.0

04/06/06

06/01/06

100,000 04/06/06

06/01/06

80,000

100

300 09 / 33079

ON S KOLIN AVE FROM W 63RD ST TO W MARQUETTE RD

4.0

260,000 04/01/08

12/01/08

0

0

300 09 / 33079

ON S KOMENSKY AVE FROM W 63RD ST TO W MARQUETTE RD

4.0

237,593

300 05 0013 / 5128

ON S KOSTNER AVE FROM W 55TH ST TO W 57TH ST

2.0

04/04/05

11/18/05

300 06 0298 / 5405

ON S KOSTNER AVE FROM W 57TH ST TO W 59TH ST

2.0

07/25/05

300 06 / 32275

6300-6500 S KEELER AVE

2.0

04/01/07

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

.0

03/01/06

12/31/06

0

0

0

175,000 07/25/05

09/15/05

73,233

100

11/01/05

0 08/01/05

09/19/05

127,848

100

12/31/07

153,971 03/22/07

06/01/07

94,709

100

30.0

1,915,658

474,828

Blocks

300 03 0013 / 4884

ON S KOSTNER AVE FROM W 59TH ST TO W 65TH ST

6.0

06/01/04

11/30/04

465,000 06/16/04

12/14/04

442,237

100

300 06 0267 / 5375

ON S KOSTNER AVE FROM W 63RD ST TO W 65TH ST

2.0

06/01/04

09/01/04

150,000 06/16/04

12/14/04

76,780

100

300 06 / 32050

ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE

4.0

06/15/06

04/01/06

200,000 06/15/06

09/15/06

199,615

100

300 06 / 32050

ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD

3.0

06/15/06

01/17/07

180,000 10/23/06

02/16/07

197,854

100

300 06 0122 / 5275

ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE

1.0

05/01/03

07/01/03

106,250 04/22/03

06/30/03

106,250

100

300 06 0235 / 5349

ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE

2.0

05/01/03

08/01/03

75,243 03/14/03

06/06/03

69,065

100

300 06 0235 / 5349

ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE

2.0

05/01/03

07/01/03

77,102 04/22/03

06/30/03

69,065

100

300 06 / 32050

6500-6700 S KEELER AVE

2.0

06/15/06

04/01/06

110,000 06/15/06

09/07/06

102,960

100

300 06 / 32050

4000 W 70TH ST

2.0

06/15/06

06/15/06

125,000 06/15/06

09/07/06

121,805

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 06 / 32969

ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09

24.0

1,488,595

1,385,631

Locations 1.0

12/03/07

02/29/08

60,000 01/11/08

03/28/08

34,407

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 141

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

30.15

08/07/07

08/18/07

6,633 08/07/07

08/18/07

6,633

100

300 07 0013 / 5436

ON S KARLOV AVE FROM W 79TH ST TO W 80TH PL

4.0

08/01/06

08/10/06

800 08/22/06

08/22/06

721

100

300 07 0013 / 5436

ON S KEDVALE AVE FROM W 79TH PL TO W 80TH PL

3.0

08/01/06

08/10/06

600 08/22/06

08/22/06

541

100

300 07 0013 / 5436

ON S KEELER AVE FROM W 79TH PL TO W 80TH PL

4.0

08/01/06

08/10/06

800 08/22/06

08/22/06

721

100

300 07 0013 / 5436

ON S KOMENSKY AVE FROM W 79TH ST TO W 80TH PL

2.0

08/01/06

08/10/06

400 08/22/06

08/22/06

360

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

3.75

06/02/08

06/13/08

1,125 06/02/08

06/13/08

788

100

300 06 0058 / 5229

ON S PULASKI RD FROM W 55TH ST TO W 83RD ST

190.0

52,780 08/12/02

09/25/02

52,780

100

302 00 0076 / 5764

ON S PULASKI RD FROM W 59TH ST TO W 74TH ST

230.0

06/01/98

06/18/98

0 06/01/98

06/18/98

3,910

100

300 07 0013 / 5436

ON S TRIPP AVE FROM W 79TH ST TO W 81ST ST

3.0

08/01/06

08/10/06

600 08/22/06

08/22/06

540

100

300 04 0216 / 5114

ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE

9.0

05/01/06

11/01/06

1,911 05/17/06

06/29/06

1,911

100

300 06 0108 / 5263

ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE

61.0

06/20/03

06/29/03

15,550 05/30/03

06/06/03

15,330

100

300 06 0058 / 5229

ON W 63RD ST FROM S KARLOV AVE TO S LAWNDALE AVE

121.0

08/12/02

09/25/02

30,660 08/12/02

09/25/02

30,660

100

302 00 0076 / 5764

ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE

187.44

09/01/00

12/31/00

300 06 0108 / 5263

ON W 71ST ST FROM S CENTRAL PARK AVE TO S PULASKI RD

22.0

07/01/03

07/14/03

6,600 06/15/03

06/30/03

6,580

100

300 06 0108 / 5263

W 63RD ST AND S CICERO AVE

10.0

06/25/03

07/04/03

3,800 07/25/03

08/05/03

3,290

100

300 06 / 33438

6200-6300 S CENTRAL AVE

20.0

06/30/08

07/25/08

7,100 08/27/08

08/29/08

4,200

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0296 / 5403

W 63RD PL AND S PULASKI RD

Work Type: Strt Lighting

900.34

0

3,186

129,359

132,150

Blocks 1.0

03/01/05

08/15/07

45,200 01/17/07

10/15/07

22,051

100

Blocks

300 06 0246 / 5356

ON S LATROBE AVE FROM W 63RD ST TO W 65TH ST

2.0

04/01/04

07/01/04

108,345 04/06/04

08/24/04

80,494

100

300 06 0246 / 5356

ON S LAWLER AVE FROM W 63RD ST TO W 64TH ST

1.0

04/01/04

07/01/04

108,345 04/06/04

08/24/04

80,494

100

300 06 0246 / 5356

ON S LECLAIRE AVE FROM W 63RD PL TO W 65TH ST

1.50

04/01/04

07/01/04

108,345 04/06/04

08/24/04

80,494

100

300 06 0247 / 5357

ON W 58TH ST FROM S KEELER AVE TO S KILDARE AVE

2.0

10/15/03

12/15/03

132,000 10/08/03

11/14/03

131,842

100

300 06 0246 / 5356

ON W 63RD PL FROM S LATROBE AVE TO S LAWLER AVE

2.0

04/01/04

07/01/04

108,345 04/06/04

08/24/04

80,494

100

8.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

6500 S PULASKI RD

565,380

453,818

Lamps 1,015.0

03/01/04

12/01/04

5,278 07/31/06

08/28/06

11,053

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 142

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0099 / 5260

6500 S PULASKI RD

106.0

10/07/03

10/08/03

5,959 09/24/03

09/25/03

6,426

100

805 06 2449 / 8635

3601 W 59TH ST

12.0

04/13/93

04/13/93

0 04/13/93

04/13/93

9,000

100

805 06 2450 / 8636

3601 W 60TH ST

8.0

04/14/93

04/14/93

0 04/14/93

04/14/93

6,000

100

805 06 2821 / 9007

3630 W 61ST ST

8.0

03/28/94

03/28/94

0 03/28/94

03/28/94

6,000

100

805 06 2820 / 9006

3600 W 62ND ST

8.0

01/13/93

01/13/93

0 01/13/93

01/13/93

6,000

100

805 06 2815 / 9001

3600 W 63RD ST

10.0

05/02/93

05/02/93

0 05/02/93

05/02/93

7,500

100

805 06 2817 / 9003

3600 W 64TH ST

8.0

05/14/93

05/14/93

0 05/14/93

05/14/93

6,000

100

805 06 2819 / 9005

3600 W 65TH ST

8.0

05/17/93

05/17/93

0 05/17/93

05/17/93

6,000

100

805 06 2816 / 9002

3600 W 66TH ST

8.0

05/19/93

05/19/93

0 05/19/93

05/19/93

6,000

100

805 06 2814 / 9000

3605 W MARQUETTE RD

10.0

05/25/93

05/25/93

0 05/25/93

05/25/93

7,500

100

Totals per Underpass Lighting

186.0

5,959

66,426

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 143

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S AUSTIN AVE AND W 63RD ST

.50

0 08/29/02

08/29/02

4,675

100

210 06 0130 / 4389

S CICERO AVE AND W 59TH ST

.50

0 11/05/02

11/05/02

925

100

210 06 0130 / 4389

S MELVINA AVE AND W 63RD ST

.50

0 08/28/02

08/28/02

4,675

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0127 / 4386

S KILDARE AVE AND W MARQUETTE RD

Work Type: New Signal

1.50

0

10,274

0

0

Locations .0

06/01/05

12/01/05

0

Locations

210 06 0127 / 4386

S KILDARE AVE AND W MARQUETTE RD

.0

06/01/05

12/01/05

0

0

0

210 06 0127 / 4386

W 55TH ST AND S KILBOURN AVE

.50

12/01/06

03/31/07

105,000

161,541

100

300 06 0283 / 5391

W 63RD ST AND S KEELER AVE

1.0

09/02/04

09/30/04

69

100

1.50

Totals per New Signal

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

W 63RD ST AND S LATROBE AVE

Work Type: Signals 300 06 0096 / 5258

6500 S PULASKI RD

Work Type: TSM Install

69 09/09/04

09/09/04

105,069

161,610

Crossings .50

2,000 06/08/01

08/01/01

134

100

Intersections 30.0

09/01/03

09/07/03

0 08/23/03

09/02/03

4,744

100

Locations

210 06 0187 / 4432

W 63RD ST AND S LATROBE AVE

.50

06/01/04

08/15/06

100,000 06/14/04

09/27/06

89,629

100

814 06 0262 / 16474

6000 S CENTRAL AVE

1.0

08/21/90

08/21/90

0 08/21/90

08/21/90

72,704

100

814 06 0192 / 16404

6300 S CENTRAL AVE

1.0

10/17/95

10/17/95

0 10/17/95

10/17/95

125,000

100

814 06 0370 / 16560

6300 S KEELER AVE

1.0

11/08/95

11/08/95

0 11/08/95

11/08/95

86,471

100

210 06 0090 / 4353

6300 S KILBOURN AVE

1.0

11/01/99

03/01/00

150,000 10/01/99

11/30/99

108,398

100

814 06 0146 / 16360

6700 S LAWNDALE AVE

1.0

08/27/91

08/27/91

0 08/27/91

08/27/91

94,990

100

814 06 0274 / 16486

7500 S PULASKI RD

1.0

04/27/89

04/27/89

0 04/27/89

04/27/89

97,888

100

Totals per TSM Install Totals per Traffic

6.50

250,000

675,080

357,722

852,466

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 144

1/1/2008 AND 12/31/2008

Ward 13 Frank J. Olivo CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting 300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

Locations 1.34

08/07/07

08/18/07

603 08/07/07

08/18/07

603

100

.25

06/02/08

06/13/08

50 06/02/08

06/13/08

21

100

1.59

653

624

Totals per Construction Phase

6,111,600

4,650,836

Totals for Ward 13

6,134,300

4,676,109

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 145

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0299 / 5406

BUREAU OF ELECTRICITY

300 06 0308 / 5414

ON S HARDING AVE FROM W 47TH ST TO W 49TH ST

300 06 / 32277

ON S KEELER AVE FROM W 43RD ST TO W 47TH ST

300 06 0292 / 5399

4720 S ST LOUIS AVE

Totals per Design/Engineering

Work Type: Feasibility Study

Projects 1.0

10/01/01

10/03/03

300,000 01/01/02

12/31/04

76,558

100

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

7,303

100

4.0

04/01/08

08/30/08

260,000 04/22/08

05/09/08

0

100

.0

01/20/05

12/21/05

0 01/20/05

03/01/05

0

100

5.0

560,000

83,861

Projects

302 00 0079 / 5767

ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

302 00 0079 / 5767

ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

Totals per Feasibility Study Totals per Lighting/Electrical

.0

0

0

560,000

83,861

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 146

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0122 / 5275

ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD

300 06 0069 / 5233

ON S ALBANY AVE FROM W 43RD ST TO W 47TH ST

300 06 0122 / 5275

ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD

300 06 0069 / 5233

Fixtures .80

08/01/04

08/15/04

316 06/14/04

06/22/04

218

100

59.0

10/04/02

10/22/02

23,600 10/01/02

10/18/02

12,463

100

3.0

08/01/04

08/15/04

1,125 06/15/04

06/21/04

919

100

ON S FRANCISCO AVE FROM W 43RD ST TO W 47TH ST

60.0

10/04/02

10/22/02

24,000 10/01/02

10/18/02

12,463

100

300 06 0069 / 5233

ON S MOZART ST FROM W 43RD ST TO W 47TH ST

30.0

10/04/02

10/22/02

12,000 10/01/02

10/18/02

6,232

100

300 06 0122 / 5275

ON S MOZART ST FROM W 45TH ST TO W 47TH ST

4.50

03/15/03

03/15/03

914 03/12/03

03/12/03

945

100

300 06 0069 / 5233

ON S RICHMOND ST FROM W 43RD ST TO W 47TH ST

60.0

10/04/02

10/22/02

24,000 10/01/02

10/18/02

12,463

100

300 06 0069 / 5233

ON S SACRAMENTO AVE FROM W 43RD ST TO W 47TH ST

60.0

10/04/02

10/22/02

24,000 10/01/02

10/18/02

12,462

100

300 06 0069 / 5233

ON S WHIPPLE ST FROM W 43RD ST TO W 47TH ST

60.0

10/04/02

10/22/02

24,000 10/01/02

10/18/02

12,672

100

300 06 0069 / 5233

S ARCHER AVE AND S DRAKE AVE

19.0

05/10/02

05/10/02

3,990 05/07/02

05/07/02

3,857

100

302 00 0092 / 5774

4100-4199 S FRANCISCO AVE

5.0

11/01/01

11/01/01

1,029 09/29/01

09/29/01

1,029

100

302 00 0092 / 5774

4115 S FRANCISCO AVE

1.0

10/06/01

10/06/01

206 09/29/01

09/29/01

206

100

302 00 0092 / 5774

4201 S FRANCISCO AVE

1.0

0 11/24/01

11/24/01

206

100

302 00 0092 / 5774

4915-5000 S ROCKWELL ST

2.0

617 11/21/01

11/21/01

617

100

302 00 0092 / 5774

5100 S ROCKWELL ST

5.0

0 08/28/01

08/28/01

1,029

100

300 06 0069 / 5233

4100 S SACRAMENTO AVE

2.0

420 02/01/02

02/01/02

406

100

302 00 0092 / 5774

4500-4599 S SAWYER AVE

11.0

0 12/07/01

12/07/01

2,261

100

302 00 0092 / 5774

5631-5647 S SPAULDING AVE

2.0

10/07/01

10/07/01

412 09/29/01

09/29/01

412

100

300 06 0069 / 5233

3001 W 40TH PL

1.0

02/04/02

02/04/02

210 02/01/02

02/01/02

203

100

300 06 0069 / 5233

3001 W 40TH ST

1.0

02/04/02

02/04/02

210 02/01/02

02/01/02

203

100

300 06 0122 / 5275

2958 W 43RD ST

1.0

05/09/03

05/09/03

210 05/06/03

05/06/03

203

100

300 06 0069 / 5233

3055 W 43RD ST

1.0

01/11/02

01/11/02

210 01/18/02

01/18/02

203

100

302 00 0092 / 5774

3055 W 43RD ST

1.0

0 01/18/02

01/18/02

203

100

300 06 0122 / 5275

2650 W 51ST ST

1,078.0

420,850 07/28/03

08/20/03

258,291

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

1,468.30

10/01/01

02/04/02

09/10/03

10/01/01

02/04/02

10/10/03

562,319

340,165

3,103,642

1,875,984

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 147

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 05 0014 / 5129

ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD

300 05 0014 / 5129

ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE

300 06 0122 / 5275

ON S PULASKI RD FROM W 40TH ST TO W 51ST ST

300 06 0069 / 5233

ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE

6.50

302 00 0092 / 5774

ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE

6.50

02/24/02

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

47.52

300 05 0014 / 5129

ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

302 00 0092 / 5774

3300 W 55TH ST

Totals per 400 Watt Changeout

39.0

04/04/05

11/18/05

15,600 06/01/05

06/20/05

21,333

100

3.0

04/04/05

11/18/05

1,200 06/01/05

06/20/05

2,120

100

165.0

05/01/03

06/01/03

66,600 06/20/03

06/25/03

40,202

100

2,600 02/21/02

02/21/02

2,600

100

02/24/02

2,600 02/21/02

02/21/02

2,438

100

05/10/04

06/10/04

19,008 05/01/04

05/11/04

18,321

100

96.0

04/04/05

11/18/05

38,400 06/01/05

06/20/05

58,848

100

112.69

05/01/04

05/15/04

45,076 05/10/04

05/16/04

16,013

100

5.0

03/03/02

03/03/02

2,000 02/28/02

02/28/02

1,875

100

481.21

193,084

163,750

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 148

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0767 / 6953

3833 S ALBANY AVE

1.0

05/24/96

05/24/96

0 05/24/96

05/24/96

300

100

805 06 0710 / 6896

4393 S ARCHER AVE

1.0

06/19/96

06/19/96

0 06/19/96

06/19/96

300

100

805 06 0711 / 6897

4432 S ARCHER AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0712 / 6898

4452 S ARCHER AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0713 / 6899

4589 S ARCHER AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0744 / 6930

5315 S ARTESIAN AVE

1.0

01/11/95

01/11/95

0 01/11/95

01/11/95

300

100

805 06 0764 / 6950

5400 S ARTESIAN AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 1911 / 8097

4401 S CHRISTIANA AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 2029 / 8215

5530 S CHRISTIANA AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0496 / 6682

5558 S CHRISTIANA AVE

1.0

01/12/95

01/12/95

0 01/12/95

01/12/95

300

100

805 06 0507 / 6693

5609 S CHRISTIANA AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 0488 / 6674

5630 S CHRISTIANA AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0469 / 6655

5640 S CHRISTIANA AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0480 / 6666

5658 S CHRISTIANA AVE

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 0343 / 6529

5734 S CHRISTIANA AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 0442 / 6628

5758 S CHRISTIANA AVE

1.0

01/23/95

01/23/95

0 01/23/95

01/23/95

300

100

805 06 0643 / 6829

4643 S DRAKE AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 1770 / 7956

5022 S FAIRFIELD AVE

1.0

05/15/97

05/15/97

0 05/15/97

05/15/97

300

100

805 06 0842 / 7028

4323 S FRANCISCO AVE

1.0

01/27/95

01/27/95

0 01/27/95

01/27/95

300

100

805 06 0971 / 7157

4458 S FRANCISCO AVE

1.0

01/26/95

01/26/95

0 01/26/95

01/26/95

300

100

805 06 1082 / 7268

4600 S HOMAN AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 1103 / 7289

5500 S HOMAN AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 1084 / 7270

5501 S HOMAN AVE

1.0

04/13/95

04/13/95

0 04/13/95

04/13/95

300

100

805 06 1085 / 7271

5506 S HOMAN AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 1086 / 7272

5516 S HOMAN AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 1087 / 7273

5540 S HOMAN AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 1089 / 7275

5558 S HOMAN AVE

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1090 / 7276

5620 S HOMAN AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 1091 / 7277

5630 S HOMAN AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 1092 / 7278

5656 S HOMAN AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 1093 / 7279

5740 S HOMAN AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 149

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1081 / 7267

5758 S HOMAN AVE

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1420 / 7606

4359 S KARLOV AVE

1.0

08/06/96

08/06/96

0 08/06/96

08/06/96

300

100

805 06 1165 / 7351

4000 S KEDZIE AVE

1.0

03/14/96

03/14/96

0 03/14/96

03/14/96

300

100

805 06 1558 / 7744

4515 S KOMENSKY AVE

1.0

10/17/97

10/17/97

0 10/17/97

10/17/97

300

100

805 06 1559 / 7745

4539 S KOMENSKY AVE

1.0

10/17/97

10/17/97

0 10/17/97

10/17/97

300

100

805 06 1560 / 7746

4559 S KOMENSKY AVE

1.0

10/17/97

10/17/97

0 10/17/97

10/17/97

300

100

805 06 0328 / 6514

5002 S LAWNDALE AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 1885 / 8071

5375 S MAPLEWOOD AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 0688 / 6874

4417 S RICHMOND ST

1.0

10/18/95

10/18/95

0 10/18/95

10/18/95

300

100

805 06 0691 / 6877

5019 S ROCKWELL ST

1.0

08/30/95

08/30/95

0 08/30/95

08/30/95

300

100

805 06 0701 / 6887

3834 S SACRAMENTO AVE

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0704 / 6890

4433 S SACRAMENTO AVE

1.0

01/27/95

01/27/95

0 01/27/95

01/27/95

300

100

805 06 0657 / 6843

4343 S SPAULDING AVE

1.0

06/05/95

06/05/95

0 06/05/95

06/05/95

300

100

805 06 0658 / 6844

4424 S SPAULDING AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0631 / 6817

5856 S SPAULDING AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 0435 / 6621

4748 S SPRINGFIELD AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0417 / 6603

4425 S ST LOUIS AVE

1.0

08/28/95

08/28/95

0 08/28/95

08/28/95

300

100

805 06 0418 / 6604

4501 S ST LOUIS AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0419 / 6605

4621 S ST LOUIS AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0393 / 6579

5501 S ST LOUIS AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0348 / 6534

5620 S TROY ST

1.0

01/10/95

01/10/95

0 01/10/95

01/10/95

300

100

805 06 1672 / 7858

4342 S TRUMBULL AVE

1.0

07/22/97

07/22/97

0 07/22/97

07/22/97

300

100

805 06 0387 / 6573

5516 S TRUMBULL AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 0368 / 6554

5530 S TRUMBULL AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0369 / 6555

5618 S TRUMBULL AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 0371 / 6557

5630 S TRUMBULL AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0372 / 6558

5640 S TRUMBULL AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 0373 / 6559

5656 S TRUMBULL AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 0521 / 6707

5150 S WESTERN AVE

1.0

05/22/95

05/22/95

0 05/22/95

05/22/95

300

100

805 06 0451 / 6637

4349 S WHIPPLE ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0452 / 6638

5714 S WHIPPLE ST

1.0

04/13/95

04/13/95

0 04/13/95

04/13/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 150

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0896 / 7082

2923 W 38TH PL

1.0

06/05/95

06/05/95

0 06/05/95

06/05/95

300

100

805 06 0897 / 7083

2935 W 38TH PL

1.0

06/05/95

06/05/95

0 06/05/95

06/05/95

300

100

302 00 0092 / 5774

3108 W 39TH PL

1.0

0 12/24/01

12/24/01

236

100

805 06 0920 / 7106

2822 W 40TH ST

1.0

04/16/96

04/16/96

0 04/16/96

04/16/96

300

100

805 06 0923 / 7109

3100 W 44TH ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0924 / 7110

3118 W 44TH ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0910 / 7096

4200 W 46TH ST

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0919 / 7105

3528 W 47TH ST

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 0930 / 7116

4010 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0901 / 7087

4024 W 47TH ST

1.0

05/28/96

05/28/96

0 05/28/96

05/28/96

300

100

805 06 0902 / 7088

4034 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0903 / 7089

4058 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0904 / 7090

4100 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0905 / 7091

4124 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0907 / 7093

4134 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0908 / 7094

4158 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 0909 / 7095

4200 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 1050 / 7236

3712 W 50TH ST

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

302 00 0092 / 5774

2559 W 51ST ST

1.0

0 09/27/01

09/27/01

236

100

300 06 0139 / 5289

2650 W 51ST ST

1,371.0

33,005 04/01/06

04/21/06

41,423

100

302 00 0092 / 5774

2650 W 51ST ST

29.0

0 03/07/01

11/27/01

6,834

100

805 06 0955 / 7141

2654 W 51ST ST

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1497 / 7683

3222 W 55TH ST

1.0

11/14/97

11/14/97

0 11/14/97

11/14/97

300

100

805 06 1030 / 7216

3337 W 55TH ST

1.0

01/26/95

01/26/95

0 01/26/95

01/26/95

300

100

805 06 1031 / 7217

3417 W 55TH ST

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1034 / 7220

3434 W 56TH ST

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1006 / 7192

3744 W 57TH ST

1.0

04/27/95

04/27/95

0 04/27/95

04/27/95

300

100

805 06 1381 / 7567

3741 W 58TH PL

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 0555 / 6741

2956 W PERSHING RD

1.0

01/24/96

01/24/96

0 01/24/96

01/24/96

300

100

805 06 0526 / 6712

3016 W PERSHING RD

1.0

06/17/96

06/17/96

0 06/17/96

06/17/96

300

100

805 06 0527 / 6713

3038 W PERSHING RD

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

03/01/06

09/01/06

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 151

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping

Installations 1,491.0

33,005

75,429

Lamps

300 06 0215 / 5336

5236 S WESTERN AVE

1,299.0

06/01/07

12/31/07

38,242 09/01/07

09/01/07

37,086

100

300 06 0215 / 5336

2650 W 51ST ST

1,627.0

06/01/07

12/31/07

47,898 09/01/07

10/01/07

46,450

100

Totals per Arterial Group Relamping

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2650 W 51ST ST

Work Type: Flood Light Install

2,926.0

86,140

83,536

Installations 1,532.0

0 07/09/02

07/12/02

27,895

100

Fixtures

300 06 0167 / 5306

S ARCHER AVE AND S PULASKI RD

5.0

0 11/23/99

11/23/99

1,755

100

300 06 0167 / 5306

W 55TH ST AND S CALIFORNIA AVE

2.50

0 12/08/99

12/08/99

376

100

300 06 0167 / 5306

W 55TH ST AND S KEDZIE AVE

4.0

0 05/20/99

05/20/99

1,404

100

302 00 0092 / 5774

4101 S CICERO AVE

2.0

0 05/02/01

05/02/01

941

100

302 00 0092 / 5774

4107 S CICERO AVE

2.0

0 05/02/01

05/02/01

941

100

302 00 0092 / 5774

4111 S CICERO AVE

2.0

0 05/02/01

05/02/01

941

100

302 00 0092 / 5774

4115 S CICERO AVE

2.0

0 05/02/01

05/02/01

941

100

302 00 0092 / 5774

4121 S CICERO AVE

2.0

0 05/02/01

05/02/01

941

100

300 06 0167 / 5306

3800 S FRANCISCO AVE

1.0

0 12/08/99

12/08/99

351

100

300 09 / 33080

5317 S MOZART ST

1.0

500

0

0

300 09 / 33080

5401 S MOZART ST

1.0

500

0

0

300 09 / 33080

5440 S MOZART ST

1.0

350

0

0

300 06 0072 / 5235

5656 S ST LOUIS AVE

300 09 / 33080

2836 W 55TH ST

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

4720 S ST LOUIS AVE Project has been completed. (100%) Note Last Updated on 01-SEP-06

08/03/01

09/28/01

0 07/02/01

07/02/01

2,553

1.0

350

0

26.50

1,700

11,144

0

Installations 1.0

03/11/05

01/23/06

6,000 03/11/05

01/23/06

1,229

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 152

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 302 00 0092 / 5774

ON S KEDZIE AVE FROM W 51ST ST TO W 55TH ST

Work Type: Ornamental - Piggyback Lighting

Projects 50.0

66,000 10/08/01

11/15/01

35,349

100

Fixtures

300 05 0014 / 5129

ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD

20.0

04/04/05

11/18/05

27,000 05/01/05

06/20/05

10,940

100

300 05 0014 / 5129

ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE

13.0

04/04/05

11/18/05

17,550 06/01/05

06/20/05

24,240

100

300 06 0122 / 5275

ON S KEDZIE AVE FROM W 55TH ST TO W 57TH ST

14.0

16,800 08/27/03

08/27/03

19,097

100

300 05 0014 / 5129

ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE

300 05 0014 / 5129

ON W 51ST ST FROM S WESTERN AVE TO S CALIFORNIA AVE

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

2650 W 51ST ST

3.0

04/04/05

11/18/05

4,050 06/01/05

06/20/05

2,121

100

17.0

04/04/05

11/18/05

22,950 06/01/05

06/20/05

10,527

100

11.80

05/01/04

05/15/04

15,930 05/10/04

05/21/04

17,029

100

78.80

104,280

83,954

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 153

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0014 / 5437

ON S ALBANY AVE FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

300 11 / 32203

ON S AVERS AVE FROM W 45TH ST TO W 47TH ST

2.0

09/27/07

12/31/07

155,000

0

0

300 07 0014 / 5437

ON S AVERS AVE FROM W 47TH ST TO S ARCHER AVE

2.0

05/31/06

07/31/06

140,000 05/31/06

93,542

100

300 07 0014 / 5437

ON S CALIFORNIA AVE FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S CHRISTIANA AVE FROM W 56TH ST TO W 57TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S FRANCISCO AVE FROM S ARCHER AVE TO W 42ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S FRANCISCO AVE FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S FRANCISCO AVE FROM W 51ST ST TO W 52ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S FRANCISCO AVE FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 06 0298 / 5405

ON S HAMLIN AVE FROM W 47TH ST TO W 49TH ST

2.0

06/15/05

07/15/05

0 05/23/05

07/22/05

97,512

100

300 07 0014 / 5437

ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL

0

0

300 06 0308 / 5414

ON S HARDING AVE FROM W 47TH ST TO W 49TH ST

04/21/06

108,603

100

300 07 0014 / 5437 300 07 0014 / 5437

07/21/06

0

0

.0

03/01/06

12/31/06

2.0

03/15/06

05/15/06

ON S HOMAN AVE FROM W 55TH ST TO W 56TH ST

.0

03/01/06

12/31/06

0

0

0

ON S HOMAN AVE FROM W 56TH ST TO W 57TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S HOMAN AVE FROM W 57TH ST TO W 58TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S HOMAN AVE FROM W 58TH ST TO W 59TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KARLOV AVE FROM W 43RD ST TO W 44TH ST

.0

03/01/06

12/31/06

0

0

0

300 09 / 33080

ON S KARLOV AVE FROM W 43RD ST TO W 47TH ST

4.0

04/19/08

05/09/08

0

100

300 07 0014 / 5437

ON S KARLOV AVE FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KARLOV AVE FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KARLOV AVE FROM W 49TH ST TO W 50TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KARLOV AVE FROM W 50TH ST TO S ARCHER AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KEDVALE AVE FROM W 43RD ST TO W 44TH ST

.0

03/01/06

12/31/06

0

0

0

300 09 / 33080

ON S KEDVALE AVE FROM W 43RD ST TO W 47TH ST

4.0

04/19/08

05/09/08

0

100

300 07 0014 / 5437

ON S KEDVALE AVE FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KEDVALE AVE FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KEDVALE AVE FROM W 46TH ST TO W 47TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KEELER AVE FROM W 43RD ST TO W 44TH ST

.0

03/01/06

12/31/06

0

0

0

300 06 / 32277

ON S KEELER AVE FROM W 43RD ST TO W 47TH ST

.0

05/04/08

12/31/08

0

0

0

300 07 0014 / 5437

ON S KEELER AVE FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 09 / 33080

ON S KOMENSKY AVE FROM W 43RD ST TO W 47TH ST

4.0

04/19/08

05/09/08

0

100

158,374 03/07/06

260,000 04/01/08

260,000 04/01/08

260,000 04/01/08

12/01/08

12/01/08

12/01/08

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 154

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0014 / 5437

ON S KOMENSKY AVE FROM W 46TH ST TO W 47TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S KOMENSKY AVE FROM W 49TH ST TO W 50TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MAPLEWOOD AVE FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MAPLEWOOD AVE FROM W 53RD ST TO W 54TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MAPLEWOOD AVE FROM W 54TH ST TO W 55TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM S ARCHER AVE TO W 42ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM W 51ST ST TO W 52ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S MOZART ST FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S RICHMOND ST FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S RICHMOND ST FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S RICHMOND ST FROM W 46TH ST TO W 47TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S RICHMOND ST FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 05 0014 / 5129

ON S RIDGEWAY AVE FROM W 47TH ST TO S ARCHER AVE

1.0

04/04/05

11/18/05

50,024

100

300 07 0014 / 5437

ON S ROCKWELL ST FROM W 53RD ST TO W 54TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SACRAMENTO AVE FROM S ARCHER AVE TO W POPE JOHN PAUL II DR ON S SACRAMENTO AVE FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SACRAMENTO AVE FROM W 46TH ST TO W 47TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SACRAMENTO AVE FROM W 51ST ST TO W 52ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SACRAMENTO AVE FROM W POPE JOHN PAUL II DR TO W 44TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SAWYER AVE FROM W 55TH ST TO W 56TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SAWYER AVE FROM W 56TH ST TO W 57TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SAWYER AVE FROM W 57TH ST TO W 58TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SAWYER AVE FROM W 58TH ST TO W 59TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SPAULDING AVE FROM W 56TH ST TO W 57TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S SPRINGFIELD AVE FROM W 47TH ST TO W 49TH ST

2.0

05/31/06

07/31/06

93,543

100

300 07 0014 / 5437

ON S TROY ST FROM W 45TH ST TO W 46TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S TROY ST FROM W 51ST ST TO W 52ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S TRUMBULL AVE FROM W 55TH ST TO W 56TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S TRUMBULL AVE FROM W 56TH ST TO W 57TH ST

.0

03/01/06

12/31/06

0

0

0

85,000 05/23/05

160,000 05/31/06

07/22/05

07/21/06

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 155

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0014 / 5437

ON S TRUMBULL AVE FROM W 57TH ST TO W 58TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S TRUMBULL AVE FROM W 58TH ST TO W 59TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S WHIPPLE ST FROM W 44TH ST TO W 45TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S WHIPPLE ST FROM W 51ST ST TO W 52ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S WHIPPLE ST FROM W 52ND ST TO W 53RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON S WHIPPLE ST FROM W POPE JOHN PAUL II DR TO W 44TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 42ND ST FROM S MOZART ST TO S FRANCISCO AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 47TH ST FROM S AVERS AVE TO S SPRINGFIELD AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 47TH ST FROM S SPRINGFIELD AVE TO S PULASKI RD

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 53RD ST FROM S SACRAMENTO AVE TO S WHIPPLE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 55TH ST FROM S SPAULDING AVE TO S CHRISTIANA AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 56TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 56TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 57TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 57TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 57TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 57TH ST FROM S FRANCISCO AVE TO S RICHMOND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 57TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 58TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 58TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

ON W 58TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

4400-4500 S ALBANY AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0014 / 5437

5100-5200 S CALIFORNIA AVE

.0

03/01/06

12/31/06

0

0

0

1,478,374

443,224

Totals per Residntl Staggered Lighting

23.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 156

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 06 0267 / 5375

ON S LAWNDALE AVE FROM S ARCHER AVE TO W 49TH ST

1.0

08/01/04

10/01/04

75,000 08/17/04

09/17/04

70,604

100

300 06 0235 / 5349

ON S LAWNDALE AVE FROM W 50TH ST TO W 51ST ST

1.0

03/04/03

04/28/03

81,511 03/04/03

04/18/03

70,737

100

300 06 0267 / 5375

ON S RIDGEWAY AVE FROM S ARCHER AVE TO W 49TH ST

1.0

08/01/04

10/01/04

75,000 08/17/04

09/17/04

70,604

100

300 06 0235 / 5349

ON S RIDGEWAY AVE FROM W 50TH ST TO W 51ST ST

1.0

03/04/03

04/28/03

81,511 03/04/03

04/18/03

70,736

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial

4.0

313,022

282,681

Locations

302 00 0092 / 5774

4400 S ALBANY AVE

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

5301 S MOZART ST

1.0

0 03/07/01

03/07/01

378

100

302 00 0092 / 5774

5200 S RICHMOND ST

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

2915 W 38TH PL

1.0

0 04/13/01

04/13/01

378

100

4.0

0

Totals per Short Arm Installs - Arterial

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

5000 S MAPLEWOOD AVE

1,512

Locations 1.0

0 05/16/01

05/16/01

378

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 157

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0108 / 5263

ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE

166.60

05/23/03

06/10/03

61,413 05/23/03

06/26/03

52,420

100

300 05 0014 / 5129

ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD

33.0

04/04/05

11/18/05

9,000 06/01/05

06/20/05

7,138

100

300 03 0012 / 4883

ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL

6.44

07/01/04

07/20/04

1,694 07/10/04

08/01/04

1,464

100

300 05 0014 / 5129

ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE

24.0

04/04/05

11/18/05

6,500 06/01/05

06/20/05

5,192

100

302 00 0079 / 5767

ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST

100.0

10/08/01

11/15/01

35,000 10/08/01

11/15/01

17,554

100

300 05 0014 / 5129

ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE

3.0

04/04/05

11/18/05

750 06/01/05

06/20/05

669

100

300 06 0108 / 5263

ON S PULASKI RD FROM W 40TH ST TO W 51ST ST

181.0

06/01/03

06/10/03

55,450 05/19/03

06/25/03

47,740

100

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

51.48

06/01/04

06/21/04

13,580 05/11/04

06/30/04

14,609

100

300 05 0014 / 5129

ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE

81.0

04/04/05

11/18/05

21,250 10/20/05

10/20/05

17,520

100

302 00 0076 / 5764

ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE

86.90

09/01/00

12/31/00

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

121.54

05/10/04

06/16/04

35,577 05/11/04

06/04/04

27,650

100

302 00 0079 / 5767

ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE

23.94

09/01/02

09/03/02

3,002 09/09/02

10/23/02

3,002

100

302 00 0076 / 5764

W 47TH ST AND S PULASKI RD

104.0

09/01/00

12/31/00

302 00 0077 / 5765

4068 S ARCHER AVE

1.0

0 06/15/99

06/15/99

87

100

302 00 0077 / 5765

4168 S ARCHER AVE

1.0

0 07/29/99

07/29/99

175

100

302 00 0077 / 5765

4100-4115 S CALIFORNIA AVE

2.0

0 07/29/99

07/29/99

175

100

302 00 0076 / 5764

5200-5300 S CALIFORNIA AVE

14.0

06/18/98

06/18/98

0 06/18/98

06/18/98

238

100

302 00 0076 / 5764

5400 S FAIRFIELD AVE

1.0

02/24/98

02/24/98

0 02/24/98

02/24/98

17

100

302 00 0077 / 5765

4125 S FRANCISCO AVE

1.0

0 06/17/99

06/17/99

87

100

302 00 0076 / 5764

5363 S ROCKWELL ST

1.0

02/28/98

02/28/98

0 02/24/98

02/24/98

17

100

302 00 0076 / 5764

5500 S ROCKWELL ST

1.0

02/24/98

02/24/98

0 02/24/98

02/24/98

17

100

Totals per Strt Light Pole Painting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

2650 W 51ST ST

1,004.90

0

1,477

0

1,768

243,215

199,016

Lamps 2,190.0

03/01/04

12/01/04

11,388 07/31/06

09/01/06

23,849

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 158

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2361 / 8547

3828 N PULASKI RD

9.0

11/02/95

11/02/95

0 11/02/95

11/02/95

6,750

100

805 06 2451 / 8637

4700 S ARCHER AVE

23.0

05/20/93

05/20/93

0 05/20/93

05/20/93

17,250

100

805 06 2332 / 8518

4801 S CALIFORNIA AVE

20.0

01/01/91

01/01/91

0 01/01/91

01/01/91

15,000

100

805 06 2290 / 8476

4810 S CALIFORNIA AVE

16.0

01/01/91

01/01/91

0 01/01/91

01/01/91

12,000

100

302 00 0071 / 5759

4900 S CALIFORNIA AVE

0 01/18/99

01/25/99

10,863

100

805 06 2448 / 8634

4822 S KEDZIE AVE

26.0

10/31/95

10/31/95

0 10/31/95

10/31/95

19,500

100

805 06 2271 / 8457

4823 S KEDZIE AVE

16.0

01/01/91

01/01/91

0 01/01/91

01/01/91

12,000

100

300 06 0099 / 5260

2650 W 51ST ST

91.0

10/09/03

10/09/03

5,115 09/26/03

09/26/03

3,510

100

805 06 2445 / 8631

3550 W 58TH ST

8.0

04/08/93

04/08/93

0 04/08/93

04/08/93

6,000

100

Totals per Underpass Lighting

209.0

5,115

102,873

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 159

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S CALIFORNIA AVE AND W 42ND ST

.50

0 08/27/01

08/27/01

3,662

100

210 06 0130 / 4389

S KOSTNER AVE AND W 47TH ST

.50

0 10/18/01

10/18/01

4,270

100

210 06 0130 / 4389

S PULASKI RD AND W 44TH ST

1.0

0 02/08/02

02/08/02

8,539

100

210 06 0219 / 4459

S WESTERN AVE AND W 51ST ST

.50

05/12/05

05/13/05

5,282 04/19/05

04/19/05

4,170

100

210 06 0219 / 4459

S WESTERN AVE AND W 54TH ST

.50

05/13/05

05/14/05

5,282 04/18/05

04/18/05

3,879

100

210 06 0219 / 4459

W 55TH ST AND S WESTERN AVE

.50

05/16/05

05/17/05

5,282 04/15/05

04/15/05

4,523

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0110 / 4370

4100-4199 S PULASKI RD

Work Type: New Signal

3.50

1.0

11/01/00

04/30/01

01/31/02

05/03/02

1.0

210 06 0073 / 4337

4400 S PULASKI RD

1.0

2650 W 51ST ST

Work Type: TSM Install

04/12/01

15,286

95,542

90

06/06/02

170,385

100

163,000 05/23/01

2.0

Work Type: Signals

20,000 11/03/00

100

Locations

4200 S CALIFORNIA AVE

Totals per New Signal

29,042

Locations

210 06 0133 / 4392

300 06 0096 / 5258

15,845

175,000 12/28/01 338,000

265,927

Intersections 42.0

09/21/03

09/28/03

0 08/27/03

09/04/03

6,641

100

Locations

814 06 0296 / 16508

4320 N PULASKI RD

1.0

09/11/91

09/11/91

0 09/11/91

09/11/91

106,875

100

814 06 0103 / 16318

4515 S HOMAN AVE

1.0

09/17/93

09/17/93

0 09/17/93

09/17/93

108,530

100

814 06 0217 / 16429

4699 S HOMAN AVE

1.0

01/27/95

01/27/95

0 01/27/95

01/27/95

125,000

100

814 06 0194 / 16406

3838 S PULASKI RD

1.0

11/13/95

11/13/95

0 11/13/95

11/13/95

125,000

100

4.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

0

465,405

Locations

300 05 0014 / 5129

ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD

6.0

04/04/05

11/18/05

1,500 06/01/05

06/20/05

1,875

100

300 05 0014 / 5129

ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE

9.0

04/04/05

11/18/05

2,400 06/01/05

06/20/05

2,451

100

300 05 0014 / 5129

ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE

26.0

04/04/05

11/18/05

7,900 10/20/05

10/20/05

8,364

100

Totals per Traffic Equipment Painting

41.0

11,800

12,690

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 160

1/1/2008 AND 12/31/2008

Ward 14 Edward M. Burke CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Reloc 300 06 0286 / 5394

2420 W 54TH ST

Totals per Traffic

Locations 2.0

05/01/05

06/01/05

43,000 05/09/05

06/01/05

30,498

428,645

825,489

Totals per Construction Phase

3,532,286

2,701,473

Totals for Ward 14

4,092,286

2,785,334

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 161

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST

.0

04/01/08

08/30/08

0

0

0

300 06 0308 / 5414

ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,414

100

210 06 0243 / 4480

W 61ST ST AND S KEDZIE AVE

.0

12/27/06

01/26/07

300 06 0292 / 5399

5840 S ASHLAND AVE

1.0

300 06 0292 / 5399

6312 S PAULINA ST

1.0

06/29/05

300 06 0292 / 5399

1634 W 59TH ST

.0

01/20/05

Totals per Design/Engineering

2.0

250 12/27/06

01/26/07

1,594

100

1,000 01/03/05

03/03/05

559

100

07/19/05

1,000 06/29/05

07/19/05

0

100

12/21/05

0 01/20/05

12/21/05

0

0

2,250

4,567

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 162

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 05 0015 / 5130

ON S ARTESIAN AVE FROM W 60TH ST TO W MARQUETTE RD

26.0

04/04/05

11/18/05

10,800 06/15/05

06/28/05

5,980

100

300 05 0015 / 5130

ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD

25.0

04/04/05

11/18/05

10,400 06/15/05

06/28/05

5,750

100

300 05 0015 / 5130

ON S MAPLEWOOD AVE FROM W 60TH ST TO W MARQUETTE RD

26.0

04/04/05

11/18/05

10,800 06/15/05

06/28/05

5,980

100

300 05 0015 / 5130

ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD

25.0

04/04/05

11/18/05

10,400 06/15/05

06/28/05

5,750

100

300 05 0015 / 5130

ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST

26.0

04/04/05

11/18/05

10,800 06/15/05

06/28/05

5,980

100

300 03 0015 / 4886

ON S WOOD ST FROM W 55TH ST TO W 57TH ST

10.0

09/20/04

09/26/04

3,950 10/04/04

10/05/04

2,401

100

300 06 0069 / 5233

6400 S ARTESIAN AVE

5.0

0 07/15/02

07/15/02

1,875

100

302 00 0092 / 5774

6400 S CAMPBELL AVE

2.0

0 08/20/01

08/20/01

412

100

302 00 0092 / 5774

6400-6499 S CAMPBELL AVE

5.0

09/03/01

09/04/01

1,029 08/20/01

08/20/01

1,029

100

302 00 0092 / 5774

6500 S CAMPBELL AVE

5.0

10/03/01

10/03/01

1,029 11/12/01

11/12/01

1,029

100

302 00 0092 / 5774

6509 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6527 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6545 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6559 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6801 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6813 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6829 S CAMPBELL AVE

1.0

0 11/12/01

11/12/01

206

100

210 06 0022 / 4297

5500-5599 S HONORE ST

5.0

0 02/21/02

02/21/02

1,875

100

300 06 0069 / 5233

5500-5599 S HONORE ST

5.0

1,875 02/21/02

02/21/02

1,875

100

302 00 0092 / 5774

6300-6399 S MAPLEWOOD AVE

4.0

10/24/01

10/24/01

1,029 09/29/01

09/29/01

824

100

302 00 0092 / 5774

6100-6199 S RICHMOND ST

5.0

11/01/01

11/01/01

1,029 11/21/01

11/21/01

1,029

100

302 00 0092 / 5774

6443 S ROCKWELL ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

6459 S ROCKWELL ST

1.0

0 11/12/01

11/12/01

206

100

300 06 0069 / 5233

6201 S WOLCOTT AVE

1.0

06/20/02

06/20/02

210 06/17/02

06/17/02

203

100

300 06 0069 / 5233

3500 W 66TH PL

4.0

09/29/02

09/29/02

840 09/26/02

09/26/02

812

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 03 0015 / 4886

ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE

Totals per Lighting/Electrical

188.0

64,191

44,658

Fixtures 67.0

09/20/04

09/26/04

27,200 08/16/04 1,339,688

08/24/04

17,462 1,235,310

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 163

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0728 / 6914

6123 S ALBANY AVE

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0729 / 6915

6141 S ALBANY AVE

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0730 / 6916

6223 S ALBANY AVE

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0731 / 6917

6243 S ALBANY AVE

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0747 / 6933

6403 S ARTESIAN AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

302 00 0083 / 5768

6154 S ASHLAND AVE

0 10/30/97

10/30/97

267

100

805 06 1248 / 7434

6154 S ASHLAND AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 0750 / 6936

6159 S ASHLAND AVE

1.0

06/22/95

06/22/95

0 06/22/95

06/22/95

300

100

302 00 0083 / 5768

6648 S ASHLAND AVE

0 10/30/97

10/30/97

267

100

805 06 1250 / 7436

6648 S ASHLAND AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1866 / 8052

6219 S CLAREMONT AVE

1.0

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

302 00 0083 / 5768

6700 S CLAREMONT AVE

0 10/30/97

10/30/97

266

100

805 06 1258 / 7444

6700 S CLAREMONT AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

6643 S DAMEN AVE

0 10/15/97

10/15/97

266

100

805 06 1249 / 7435

6643 S DAMEN AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

5916 S HERMITAGE AVE

0 10/15/97

10/15/97

266

100

805 06 1246 / 7432

5916 S HERMITAGE AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

5914 S HONORE ST

0 10/15/97

10/15/97

266

100

805 06 1272 / 7458

5914 S HONORE ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

6658 S HOYNE AVE

0 10/15/97

10/15/97

266

100

805 06 1253 / 7439

6658 S HOYNE AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1467 / 7653

5500 S MARSHFIELD AVE

3.0

12/03/97

12/03/97

0 12/03/97

12/03/97

900

100

302 00 0083 / 5768

5527 S MARSHFIELD AVE

0 10/15/97

10/15/97

267

100

805 06 1267 / 7453

5527 S MARSHFIELD AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

5915 S MARSHFIELD AVE

0 12/09/97

12/09/97

266

100

805 06 1274 / 7460

5915 S MARSHFIELD AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

6658 S OAKLEY AVE

0 12/09/97

12/09/97

266

100

805 06 1254 / 7440

6658 S OAKLEY AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

5911 S PAULINA ST

0 12/09/97

12/09/97

266

100

805 06 1271 / 7457

5911 S PAULINA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

6045 S PAULINA ST

0 12/09/97

12/09/97

267

100

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 164

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1247 / 7433

6045 S PAULINA ST

302 00 0083 / 5768

6656 S ROCKWELL ST

805 06 1252 / 7438

6656 S ROCKWELL ST

1.0

12/05/97

805 06 0705 / 6891

6500 S SACRAMENTO AVE

1.0

08/16/96

302 00 0083 / 5768

6658 S SEELEY AVE

805 06 1255 / 7441

6658 S SEELEY AVE

1.0

12/05/97

805 06 0422 / 6608

6100 S TALMAN AVE

1.0

10/23/96

302 00 0083 / 5768

6655 S WASHTENAW AVE

805 06 1251 / 7437

6655 S WASHTENAW AVE

302 00 0083 / 5768

5524 S WINCHESTER AVE

805 06 1263 / 7449

5524 S WINCHESTER AVE

302 00 0083 / 5768

5525 S WINCHESTER AVE

805 06 1265 / 7451

5525 S WINCHESTER AVE

302 00 0083 / 5768

5637 S WINCHESTER AVE

805 06 1269 / 7455

5637 S WINCHESTER AVE

302 00 0083 / 5768

5527 S WOLCOTT AVE

805 06 1268 / 7454

5527 S WOLCOTT AVE

302 00 0083 / 5768

5914 S WOLCOTT AVE

805 06 1273 / 7459

5914 S WOLCOTT AVE

302 00 0083 / 5768

5519 S WOOD ST

805 06 1262 / 7448

5519 S WOOD ST

302 00 0083 / 5768

5526 S WOOD ST

805 06 1266 / 7452

5526 S WOOD ST

1.0

302 00 0092 / 5774

5700 S WOOD ST

1.0

805 06 1783 / 7969

6019 S WOOD ST

1.0

302 00 0083 / 5768

6658 S WOOD ST

805 06 1257 / 7443

6658 S WOOD ST

302 00 0083 / 5768

1.0

0 12/05/97

12/05/97

300

100

0 12/09/97

12/09/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

08/16/96

0 08/16/96

08/16/96

300

100

0 12/09/97

12/09/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

10/23/96

0 10/23/96

10/23/96

300

100

0 12/12/97

12/12/97

267

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

266

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

266

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

266

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

267

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

267

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

267

100

0 12/05/97

12/05/97

300

100

0 09/17/97

09/17/97

267

100

0 12/05/97

12/05/97

300

100

0 06/26/01

06/26/01

236

100

0 04/30/97

04/30/97

300

100

0 09/17/97

09/17/97

267

100

0 12/05/97

12/05/97

300

100

1735 W 55TH ST

0 08/20/97

08/20/97

267

100

302 00 0083 / 5768

1935 W 55TH ST

0 08/20/97

08/20/97

267

100

302 00 0083 / 5768

1955 W 55TH ST

0 08/20/97

08/20/97

267

100

302 00 0083 / 5768

1955 W 59TH ST

0 08/20/97

08/20/97

266

100

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

04/30/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

04/30/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 165

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1435 / 7621

1955 W 59TH ST

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1027 / 7213

3432 W 62ND ST

1.0

06/23/95

06/23/95

0 06/23/95

06/23/95

300

100

805 06 1061 / 7247

3221 W 63RD PL

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

805 06 1063 / 7249

3239 W 63RD PL

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

805 06 1064 / 7250

3301 W 63RD PL

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

805 06 1065 / 7251

3324 W 63RD PL

1.0

01/10/95

01/10/95

0 01/10/95

01/10/95

300

100

805 06 1048 / 7234

3341 W 63RD PL

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

805 06 1037 / 7223

3403 W 63RD PL

1.0

08/17/95

08/17/95

0 08/17/95

08/17/95

300

100

805 06 1060 / 7246

3423 W 63RD PL

1.0

08/18/95

08/18/95

0 08/18/95

08/18/95

300

100

302 00 0083 / 5768

1955 W 63RD ST

0 12/10/97

12/10/97

266

100

805 06 1436 / 7622

1955 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1957 W 63RD ST

0 12/10/97

12/10/97

266

100

805 06 1437 / 7623

1957 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2006 W 63RD ST

0 12/10/97

12/10/97

267

100

805 06 1440 / 7626

2006 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2032 W 63RD ST

0 12/10/97

12/10/97

267

100

805 06 1411 / 7597

2032 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2100 W 63RD ST

0 12/10/97

12/10/97

267

100

805 06 1413 / 7599

2100 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2300 W 63RD ST

0 12/10/97

12/10/97

267

100

805 06 1416 / 7602

2300 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2332 W 63RD ST

0 12/10/97

12/10/97

267

100

805 06 1418 / 7604

2332 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2355 W 63RD ST

0 12/10/97

12/10/97

266

100

805 06 1422 / 7608

2355 W 63RD ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2434 W 63RD ST

0 12/10/97

12/10/97

266

100

805 06 1425 / 7611

2434 W 63RD ST

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

300 06 0096 / 5258

2440 W 63RD ST

1,414.0

03/01/03

09/01/03

0 03/01/06

09/01/06

42,723

0

302 00 0092 / 5774

2440 W 63RD ST

35.0

0 02/02/01

01/29/02

8,248

100

302 00 0083 / 5768

2441 W 63RD ST

0 12/10/97

12/10/97

266

100

805 06 1397 / 7583

2441 W 63RD ST

0 12/05/97

12/05/97

300

100

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 166

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0083 / 5768

2506 W 63RD ST

805 06 1400 / 7586

2506 W 63RD ST

302 00 0083 / 5768

2541 W 63RD ST

805 06 1404 / 7590

2541 W 63RD ST

302 00 0083 / 5768

2606 W 63RD ST

805 06 1405 / 7591

2606 W 63RD ST

302 00 0083 / 5768

2754 W 63RD ST

805 06 1407 / 7593

2754 W 63RD ST

302 00 0083 / 5768

2755 W 63RD ST

805 06 1408 / 7594

2755 W 63RD ST

1.0

12/05/97

805 06 1042 / 7228

2835 W 63RD ST

1.0

805 06 1044 / 7230

3217 W 63RD ST

805 06 1029 / 7215

0 12/10/97

12/10/97

266

100

0 12/05/97

12/05/97

300

100

0 12/10/97

12/10/97

266

100

0 12/05/97

12/05/97

300

100

0 12/10/97

12/10/97

267

100

0 12/05/97

12/05/97

300

100

0 12/10/97

12/10/97

267

100

0 12/05/97

12/05/97

300

100

0 12/10/97

12/10/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

1.0

01/06/95

01/06/95

0 01/06/95

01/06/95

300

100

3415 W 63RD ST

1.0

08/18/95

08/18/95

0 08/18/95

08/18/95

300

100

805 06 1045 / 7231

3433 W 63RD ST

1.0

08/18/95

08/18/95

0 08/18/95

08/18/95

300

100

805 06 1005 / 7191

3211 W 64TH PL

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 1004 / 7190

3415 W 64TH PL

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 0976 / 7162

3433 W 64TH PL

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 0980 / 7166

3227 W 64TH ST

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 0964 / 7150

3415 W 64TH ST

1.0

06/08/95

06/08/95

0 06/08/95

06/08/95

300

100

805 06 0982 / 7168

3435 W 64TH ST

1.0

06/08/95

06/08/95

0 06/08/95

06/08/95

300

100

805 06 0987 / 7173

3407 W 65TH PL

1.0

03/12/95

03/12/95

0 03/12/95

03/12/95

300

100

805 06 0988 / 7174

3209 W 65TH ST

1.0

06/08/95

06/08/95

0 06/08/95

06/08/95

300

100

805 06 0961 / 7147

3401 W 66TH ST

1.0

03/17/95

03/17/95

0 03/17/95

03/17/95

300

100

805 06 1458 / 7644

3518 W 66TH ST

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

302 00 0083 / 5768

2436 W 69TH ST

0 11/07/97

11/07/97

266

100

302 00 0083 / 5768

2502 W 69TH ST

0 11/07/97

11/07/97

266

100

805 06 1426 / 7612

1643 W GARFIELD BLVD

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1429 / 7615

1735 W GARFIELD BLVD

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1433 / 7619

1935 W GARFIELD BLVD

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1434 / 7620

1955 W GARFIELD BLVD

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1396 / 7582

2436 W LITHUANIAN PLAZA CT

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 167

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1399 / 7585

2502 W LITHUANIAN PLAZA CT

302 00 0083 / 5768

1842 W MARQUETTE RD

1.0

805 06 1431 / 7617

1842 W MARQUETTE RD

302 00 0083 / 5768

2506 W MARQUETTE RD

805 06 1402 / 7588

2506 W MARQUETTE RD

1.0

12/05/97

805 06 1890 / 8076

3400 W MARQUETTE RD

1.0

805 06 1861 / 8047

3422 W MARQUETTE RD

805 06 1862 / 8048

3434 W MARQUETTE RD

300 06 0053 / 5228

12/05/97

300

100

0 09/02/97

09/02/97

266

100

0 12/05/97

12/05/97

300

100

0 09/02/97

09/02/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

03/17/95

03/17/95

0 03/17/95

03/17/95

300

100

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

1.0

03/20/95

03/20/95

0 03/20/95

03/20/95

300

100

12/05/97

12/05/97

12/05/97

1,535.0

Totals per Alley Lighting/Lamps

Work Type: Arterial Strt Lighting/Lamps

0 12/05/97

1.0

12/05/97

0

88,967

Installations

2440 W 63RD ST

1,194.0

0 07/17/02

07/20/02

21,740

100

Fixtures

Work Type: Flood Light Install 300 09 / 33081

ON S WASHTENAW AVE FROM W 68TH ST TO W LITHUANIAN PLAZA CT

4.0

2,000 10/22/08

10/23/08

2,556

100

300 06 0167 / 5306

S ARTESIAN AVE AND W 70TH ST

.50

0 01/06/99

01/06/99

176

100

302 00 0092 / 5774

6001 S CALIFORNIA AVE

1.0

0 04/13/01

04/13/01

471

100

300 06 0167 / 5306

3255 W 65TH PL

1.0

0 04/07/99

04/07/99

351

100

300 06 0167 / 5306

3355 W 65TH PL

1.0

0 04/07/99

04/07/99

351

100

300 06 0167 / 5306

3357 W 65TH ST

1.0

0 04/07/99

04/07/99

351

100

300 06 0167 / 5306

3259 W 66TH ST

1.0

0 04/07/99

04/07/99

351

100

300 06 0167 / 5306

3357 W 66TH ST

1.0

0 04/07/99

04/07/99

351

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

6312 S PAULINA ST

300 06 0292 / 5399

1634 W 59TH ST

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting 300 06 0069 / 5233

ON S FAIRFIELD AVE FROM W 64TH ST TO W 65TH ST

10/22/08

10/23/08

10.50

2,000

4,958

Installations .0

03/01/05

12/31/05

6,209 08/19/05

08/25/05

3,074

100

1.0

02/16/05

05/12/06

33,000 02/16/05

05/12/06

23,063

100

1.0

39,209

26,137

Fixtures 5.0

7,900 08/01/02

08/01/02

7,435

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 168

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residential Regrouping 300 06 0270 / 5378

3045 W 63RD ST

Work Type: Residntl Staggered Lighting 300 06 / 32277

ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST

300 11 / 32204

ON S MARSHFIELD AVE FROM W 56TH ST TO W 58TH ST

300 11 / 32204 300 05 0015 / 5130

Lamps .0

03/01/08

12/01/08

0

.0

05/04/08

12/31/08

12/12/07

03/26/08

150,000 01/07/08

ON S MARSHFIELD AVE FROM W 64TH ST TO W MARQUETTE RD

3.0

12/26/07

03/26/08

175,000 01/07/08

ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST

.08

04/13/06

06/16/06

300 07 0015 / 5438

ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST

1.0

04/13/06

300 06 0308 / 5414

ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST

2.0

03/16/06

300 07 0017 / 5440

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

12/31/06

300 07 0017 / 5440

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

03/01/06

12/31/06

300 05 0015 / 5130

5500-5600 S MARSHFIELD AVE

.0

12/08/06

Work Type: Residntl Strt Lighting/Lamps

0

Blocks 2.50

Totals per Residntl Staggered Lighting

0

0

0

0

05/09/08

135,215

100

0

75

50,365 04/13/06

06/09/06

47,500

100

06/16/06

14,635 04/13/06

06/09/06

48,140

100

12/31/06

193,058 04/13/06

06/09/06

119,524

100

0

0

0

0

0

0

65,000

0

0

648,058

350,379

8.58

Blocks

300 06 0235 / 5349

ON S HOYNE AVE FROM W 63RD ST TO W 65TH ST

2.0

08/01/03

10/01/03

157,731 07/09/03

10/27/03

145,862

100

300 06 0267 / 5375

ON S SEELEY AVE FROM W 63RD ST TO W 65TH ST

2.0

10/01/04

11/20/04

176,401 09/24/04

12/21/04

162,993

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

4.0

334,132

308,855

Locations

302 00 0092 / 5774

6400 S WHIPPLE ST

1.0

0 05/16/01

05/16/01

378

100

302 00 0092 / 5774

6427 S WHIPPLE ST

1.0

0 05/16/01

05/16/01

378

100

302 00 0092 / 5774

6300 S WOOD ST

1.0

0 05/10/01

05/10/01

378

100

3.0

0

Totals per Short Arm Installs - Residntl

1,134

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 169

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 05 0015 / 5130

ON S ARTESIAN AVE FROM W 68TH ST TO W 60TH ST

31.0

04/04/05

11/18/05

10,500 06/15/05

06/21/05

4,470

100

300 05 0015 / 5130

ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD

31.0

04/04/05

11/18/05

8,800 06/15/05

06/21/05

4,470

100

300 04 0216 / 5114

ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST

22.50

05/01/06

11/01/06

4,867 05/17/06

10/10/06

4,867

100

300 05 0015 / 5130

ON S MAPLEWOOD AVE FROM W 68TH ST TO W 60TH ST

31.0

04/04/05

11/18/05

8,400 06/15/05

06/21/05

4,470

100

300 05 0015 / 5130

ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD

30.0

04/04/05

11/18/05

10,500 06/15/05

06/21/05

4,326

100

300 05 0015 / 5130

ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST

29.0

04/04/05

11/18/05

8,400 06/15/05

06/21/05

4,182

100

302 00 0076 / 5764

ON W 63RD ST FROM S CALIFORNIA AVE TO S ST LOUIS AVE

112.0

09/01/00

12/31/00

300 03 0015 / 4886

ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE

302 00 0076 / 5764

ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE

300 07 0017 / 5440 300 07 0017 / 5440

72.0

09/20/04

09/26/04

09/01/00

12/31/00

0

673

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

12/31/06

0

0

0

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

03/01/06

12/31/06

0

0

0

71,367

46,378

Work Type: Strt Lighting 300 06 0247 / 5357

ON S HAMILTON AVE FROM W 63RD ST TO W 64TH ST

300 06 0266 / 5374

6315 S CLAREMONT AVE

398.10

Work Type: Traffic Signal Regrouping 2440 W 63RD ST

07/14/04

17,016

100

Blocks 1.0 01/10/04

03/25/04

1.0

Totals per Strt Lighting

19,900 07/07/04

1,904

39.60

Totals per Strt Light Pole Painting

300 06 0139 / 5289

0

55,000 06/07/04

07/26/04

52,307

100

51,000 01/10/04

03/25/04

39,325

100

106,000

91,632

Lamps 951.0

03/01/04

12/01/04

4,945 07/31/06

09/05/06

10,356

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 170

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2894 / 9080

5899 S ASHLAND AVE

6.0

03/15/92

03/15/92

0 03/15/92

03/15/92

4,500

100

805 06 2533 / 8719

5801 S DAMEN AVE

6.0

03/01/92

03/01/92

0 03/01/92

03/01/92

4,500

100

805 06 2499 / 8685

5801 S HONORE ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

302 00 0071 / 5759

5830 S HONORE ST

0 11/05/98

11/11/98

6,985

100

805 06 2876 / 9062

5801 S JUSTINE ST

6.0

0 01/02/92

01/02/92

4,500

100

302 00 0072 / 5760

5800 S LAFLIN ST

1.0

0 03/09/00

03/16/00

10,313

100

805 06 2515 / 8701

5899 S PAULINA ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2482 / 8668

5899 S WINCHESTER AVE

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2530 / 8716

5899 S WOLCOTT AVE

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2544 / 8730

5899 S WOOD ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2489 / 8675

2135 W 63RD ST

17.0

12/08/95

12/08/95

0 12/08/95

12/08/95

12,750

100

805 06 2488 / 8674

2195 W 63RD ST

72.0

12/08/95

12/08/95

0 12/08/95

12/08/95

54,000

100

300 06 0099 / 5260

2440 W 63RD ST

85.0

10/10/03

10/13/03

4,755 09/26/03

10/02/03

10,174

100

300 06 0217 / 5337

2440 W 63RD ST

532.0

03/30/04

04/12/04

29,931 09/29/03

10/02/03

18,998

805 06 2340 / 8526

2218 W 65TH ST

88.0

04/04/96

04/04/96

0 04/04/96

04/04/96

66,000

Totals per Underpass Lighting

843.0

01/02/92

01/02/92

34,686

215,220

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 171

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S ASHLAND AVE AND W 59TH ST

1.0

05/07/05

05/07/05

10,653 07/05/05

07/07/05

210 06 0219 / 4459

S ASHLAND AVE AND W MARQUETTE RD

.50

05/06/05

05/06/05

5,327 07/01/05

07/05/05

0

210 06 0219 / 4459

S WESTERN AVE AND W 61ST ST

.50

05/18/05

05/19/05

5,282 04/13/05

04/13/05

4,035

100

210 06 0219 / 4459

S WESTERN AVE AND W 62ND ST

1.0

05/19/05

05/20/05

10,563 04/12/05

04/12/05

6,925

100

210 06 0219 / 4459

S WESTERN AVE AND W 65TH ST

1.0

05/21/05

05/22/05

10,563 04/11/05

04/11/05

8,368

100

210 06 0219 / 4459

S WESTERN AVE AND W MARQUETTE RD

.50

05/23/05

05/24/05

5,282 03/25/05

03/25/05

4,004

100

300 06 0225 / 5340

W 63RD ST AND S WESTERN AVE

1.0

06/01/05

07/01/05

6,105 06/01/04

06/10/04

6,105

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0231 / 4470

S KEDZIE AVE AND W MARQUETTE RD

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W 61ST ST AND S KEDZIE AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

W 63RD ST AND S ST LOUIS AVE

Work Type: Signals 300 06 0096 / 5258

2440 W 63RD ST

Work Type: TSM Install

5.50

0

53,774

29,437

122,192

0

0

Locations .0

03/01/08

12/01/08

03/15/06

05/08/07

Locations .0

6,000 02/22/07

03/20/07

2,491

100

4,000 06/07/01

04/08/02

113

100

Crossings 1.0

Intersections 32.0

09/07/03

09/16/03

0 08/21/06

08/27/06

5,060

100

Locations

814 06 0259 / 16471

5700 S ASHLAND AVE

1.0

07/21/89

07/21/89

0 07/21/89

07/21/89

75,136

100

814 06 0258 / 16470

6100 S ASHLAND AVE

1.0

08/08/89

08/08/89

0 08/08/89

08/08/89

75,136

100

814 06 0277 / 16489

6699 S ST LOUIS AVE

1.0

03/22/89

03/22/89

0 03/22/89

03/22/89

65,000

100

210 06 0072 / 4336

6700 S WOOD ST

1.0

02/10/00

04/15/00

117,452 02/02/00

04/03/00

105,461

100

4.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

117,452

320,733

Locations

300 07 0017 / 5440

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

03/01/06

12/31/06

0

0

0

0

0

Totals per Traffic Equipment Painting

.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 172

1/1/2008 AND 12/31/2008

Ward 15 Toni Foulkes CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Traffic Totals per Traffic

303,418

357,834

Totals per Construction Phase

1,643,105

1,593,144

Totals for Ward 15

1,645,355

1,597,710

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 173

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0304 / 5410

ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST

.0

08/01/05

10/15/05

0 05/07/05

06/29/05

0

100

300 06 0308 / 5414

ON W 60TH PL FROM S HALSTED ST TO S UNION AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

774

100

300 06 0308 / 5414

ON W 61ST ST FROM S HALSTED ST TO S UNION AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

774

100

210 06 0243 / 4480

W 61ST ST AND S KEDZIE AVE

.0

12/27/06

01/26/07

250 12/27/06

01/26/07

1,594

100

Totals per Design/Engineering

.0

250

3,142

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 174

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 11 / 32205

16TH WARD YARD

1,458.0

03/01/07

12/31/07

588,200 09/01/07

0

100

300 06 0069 / 5233

5954 S ALBANY AVE

1.0

04/22/02

04/22/02

210 04/19/02

04/19/02

203

100

302 00 0092 / 5774

5000-5099 S HERMITAGE AVE

6.0

10/20/01

10/20/01

1,029 10/03/01

10/03/01

1,236

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

Totals per Lighting/Electrical

1,465.0

589,439

1,439

Fixtures 30.56

05/01/04

05/15/04

12,224 05/10/04 2,192,916

05/16/04

4,343 1,266,641

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 175

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0789 / 6975

6429 S ABERDEEN ST

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0779 / 6965

6439 S ABERDEEN ST

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0752 / 6938

5915 S ALBANY AVE

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0738 / 6924

5822 S ARTESIAN AVE

1.0

02/04/97

02/04/97

0 02/04/97

02/04/97

300

100

805 06 1656 / 7842

5942 S CAMPBELL AVE

1.0

07/30/97

07/30/97

0 07/30/97

07/30/97

300

100

805 06 1518 / 7704

5836 S CARPENTER ST

1.0

10/30/97

10/30/97

0 10/30/97

10/30/97

300

100

805 06 0797 / 6983

6432 S CARPENTER ST

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 1210 / 7396

4932 S HOYNE AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 1194 / 7380

4954 S HOYNE AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

805 06 1786 / 7972

6312 S MAY ST

1.0

10/07/96

10/07/96

0 10/07/96

10/07/96

300

100

805 06 1804 / 7990

6320 S MAY ST

1.0

10/07/96

10/07/96

0 10/07/96

10/07/96

300

100

805 06 1825 / 8011

6415 S MAY ST

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 1806 / 7992

6439 S MAY ST

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 1927 / 8113

6401 S MORGAN ST

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 1973 / 8159

6445 S MORGAN ST

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 0649 / 6835

5024 S RACINE AVE

1.0

04/07/95

04/07/95

0 04/07/95

04/07/95

300

100

805 06 0681 / 6867

6345 S RACINE AVE

1.0

02/10/97

02/10/97

0 02/10/97

02/10/97

300

100

805 06 0615 / 6801

6419 S RACINE AVE

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 0366 / 6552

6005 S TROY ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

302 00 0092 / 5774

5143 S WESTERN BLVD

1.0

0 09/27/01

09/27/01

236

100

805 06 0453 / 6639

5939 S WHIPPLE ST

1.0

0 02/17/95

02/17/95

300

100

302 00 0092 / 5774

1420 W 50TH ST

1.0

0 06/18/01

06/18/01

236

100

805 06 1019 / 7205

2114 W 50TH ST

1.0

0 01/26/95

01/26/95

300

100

302 00 0083 / 5768

1634 W 55TH ST

0 08/20/97

08/20/97

267

100

302 00 0083 / 5768

2413 W 59TH ST

0 08/20/97

08/20/97

266

100

805 06 1423 / 7609

2413 W 59TH ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2537 W 59TH ST

0 08/20/97

08/20/97

266

100

805 06 1403 / 7589

2537 W 59TH ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

2757 W 59TH ST

0 08/20/97

08/20/97

267

100

805 06 1409 / 7595

2757 W 59TH ST

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1036 / 7222

1405 W 62ND ST

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

1.0

1.0

02/17/95

01/26/95

12/05/97

12/05/97

02/17/95

01/26/95

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 176

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0139 / 5289

1249 W 63RD ST

1,339.0

302 00 0092 / 5774

1351 W 63RD ST

32.0

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

1249 W 63RD ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1351 W 63RD ST

Work Type: Flood Light Install 300 06 0167 / 5306

W 55TH ST AND S CALIFORNIA AVE

302 00 0092 / 5774

5900 S ELIZABETH ST

300 06 0071 / 5234

1301 W 52ND ST

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0304 / 5410

ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST

03/01/06

09/01/06

1,398.0

32,312 04/01/06

04/16/06

40,457

100

0 01/06/01

01/09/02

7,541

100

32,312

57,036

Lamps 1,505.0

06/01/07

12/31/07

44,307 12/05/07

12/18/07

42,967

100

0 07/12/02

07/15/02

25,673

100

2.50

0 12/08/99

12/08/99

376

100

2.0

0 04/06/01

04/06/01

941

100

0 09/25/00

09/26/00

9,000

100

Installations 1,410.0

Fixtures

01/01/00

12/30/00

4.50

0

10,317

Installations 1.0

09/01/05

08/15/06

145,000 09/22/05

06/30/06

12,093

100

05/01/04

05/15/04

4,320 05/10/04

05/21/04

4,618

100

03/01/08

12/01/08

0

0

CONTRACTOR TOOK OVER JOB Note Last Updated on 04-MAR-09

Work Type: Ornamental - Piggyback Lighting 300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

Work Type: Residential Regrouping 300 06 0270 / 5378

5411 S ASHLAND AVE

Fixtures 3.20

Lamps .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 177

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 06 0298 / 5405

ON S LOOMIS BLVD FROM W 59TH ST TO W 61ST ST

2.0

116,079

100

300 09 / 33082

ON S SAWYER AVE FROM W 59TH ST TO W 61ST ST

2.0

130,000

0

0

300 09 / 33082

ON S SPAULDING AVE FROM W 59TH ST TO W 61ST ST

2.0

22,683

0

0

300 09 / 33082

ON S TROY ST FROM W 59TH ST TO W 61ST ST

2.0

130,000

0

0

300 06 0308 / 5414

ON W 60TH PL FROM S HALSTED ST TO S UNION AVE

1.0

03/16/06

12/31/06

64,482 10/17/06

35,638

80

300 06 0308 / 5414

ON W 61ST ST FROM S HALSTED ST TO S UNION AVE

1.0

03/16/06

12/31/06

64,482 10/17/06

35,638

80

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0 09/08/05

10.0

12/19/05

411,647

187,355

Blocks

300 06 0235 / 5349

ON S CALIFORNIA AVE FROM W 55TH ST TO W 57TH ST

2.0

06/01/03

08/01/03

148,623 05/30/03

07/31/03

136,196

100

300 06 0267 / 5375

ON S CALIFORNIA AVE FROM W 57TH ST TO W 59TH ST

2.0

05/29/04

08/29/04

147,831 06/01/04

08/13/04

135,820

100

300 06 0069 / 5233

ON S GREEN ST FROM W 64TH ST TO W 66TH ST

2.0

12/15/04

02/28/05

120,000 11/01/04

03/29/05

90,402

100

300 06 0069 / 5233

ON S PEORIA ST FROM W 64TH ST TO W 66TH ST

1.0

12/15/04

02/28/05

60,000 11/01/04

03/29/05

45,201

100

300 06 0166 / 5305

5500-5600 S MAY ST

1.0

09/12/00

09/26/00

65,600 09/12/00

09/26/00

53,770

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Strt Light Pole Painting

8.0

542,054

461,389

Locations

300 06 0058 / 5229

16TH WARD YARD

.0

04/01/02

10/31/02

0

0

300 11 / 32205

16TH WARD YARD

1,458.0

03/01/07

12/31/07

291,600 08/17/07

11/05/07

0

100

300 04 0216 / 5114

ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST

22.50

05/01/06

11/01/06

4,867 05/17/06

10/10/06

4,867

100

300 04 0216 / 5114

ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST

15.50

05/01/06

11/01/06

3,317 05/17/06

10/01/06

3,317

100

302 00 0076 / 5764

ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE

23.10

09/01/00

12/31/00

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

32.96

05/10/04

06/16/04

9,648 05/11/04

06/04/04

7,498

100

302 00 0076 / 5764

5700 S CALIFORNIA AVE

1.0

02/24/98

02/24/98

0 02/24/98

02/24/98

17

100

302 00 0076 / 5764

5514-5543 S TALMAN AVE

4.0

02/24/98

02/24/98

0 02/24/98

02/24/98

68

100

Totals per Strt Light Pole Painting

1,557.06

Work Type: Strt Lighting

Blocks

300 06 0247 / 5357

ON W 58TH ST FROM S OAKLEY AVE TO S WESTERN AVE

2.0

0

0

393

309,431

07/01/04

08/01/04

80,000 07/06/04

16,159

08/26/04

79,383

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 178

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

1249 W 63RD ST

Lamps 1,304.0

03/01/04

12/01/04

6,781 07/31/06

09/06/06

14,201

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 179

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2748 / 8934

1524 E 56TH ST

18.0

01/02/92

01/02/92

0 01/02/92

01/02/92

13,500

100

805 06 2966 / 9152

5801 S ABERDEEN ST

6.0

02/05/92

02/05/92

0 02/05/92

02/05/92

4,500

100

302 00 0072 / 5760

5830 S ABERDEEN ST

1.0

0 02/04/00

02/14/00

8,800

100

805 06 2892 / 9078

5801 S ADA ST

6.0

0 01/02/92

01/02/92

4,500

100

302 00 0072 / 5760

5830 S ADA ST

1.0

0 02/14/00

02/21/00

9,800

100

805 06 2895 / 9081

5801 S BISHOP ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2964 / 9150

5801 S CARPENTER ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

302 00 0072 / 5760

5830 S CARPENTER ST

1.0

0 02/22/00

02/29/00

10,000

100

805 06 2110 / 8296

4905 S DAMEN AVE

4.0

11/01/93

11/01/93

0 11/01/93

11/01/93

3,000

100

805 06 2896 / 9082

5801 S ELIZABETH ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2963 / 9149

5801 S GREEN ST

6.0

01/01/93

01/01/93

0 01/01/93

01/01/93

4,500

100

302 00 0072 / 5760

5830 S GREEN ST

1.0

0 02/25/00

03/08/00

9,500

100

302 00 0071 / 5759

5830 S HALSTED ST

0 02/12/99

02/16/99

6,206

100

805 06 2442 / 8628

4905 S HONORE ST

4.0

10/13/95

10/13/95

0 10/13/95

10/13/95

3,000

100

805 06 2117 / 8303

4905 S HOYNE AVE

6.0

05/25/93

05/25/93

0 05/25/93

05/25/93

4,500

100

805 06 2899 / 9085

5801 S LAFLIN ST

6.0

01/02/92

01/02/92

0 01/02/92

01/02/92

4,500

100

805 06 2897 / 9083

5801 S LOOMIS BLVD

10.0

01/02/92

01/02/92

0 01/02/92

01/02/92

7,500

100

302 00 0072 / 5760

5800 S LOOMIS ST

1.0

0 03/15/00

04/28/00

8,600

100

302 00 0072 / 5760

5800 S MAY ST

1.0

0 03/27/00

03/29/00

8,600

100

805 06 2891 / 9077

5801 S MAY ST

6.0

03/01/92

03/01/92

0 03/01/92

03/01/92

4,500

100

805 06 2279 / 8465

6352 S MAY ST

4.0

12/31/93

12/31/93

0 12/31/93

12/31/93

3,000

100

302 00 0072 / 5760

5830 S MORGAN ST

1.0

0 04/25/00

04/27/00

7,663

100

805 06 2843 / 9029

5899 S OAKLEY AVE

30.0

12/23/93

12/23/93

0 12/23/93

12/23/93

22,500

100

805 06 2796 / 8982

4905 S PAULINA ST

4.0

05/14/93

05/14/93

0 05/14/93

05/14/93

3,000

100

302 00 0072 / 5760

5830 S PEORIA ST

1.0

0 04/27/00

05/05/00

10,150

100

805 06 2900 / 9086

5801 S RACINE AVE

6.0

0 03/01/92

03/01/92

4,500

100

302 00 0072 / 5760

5830 S RACINE AVE

1.0

0 04/17/00

04/27/00

10,553

100

302 00 0072 / 5760

5800 S SANGAMON ST

1.0

0 03/17/00

03/24/00

8,446

100

805 06 2893 / 9079

5801 S THROOP ST

6.0

0 01/02/92

01/02/92

4,500

100

302 00 0072 / 5760

5830 S THROOP ST

1.0

0 04/19/00

04/26/00

10,553

100

805 06 2273 / 8459

4910 S WESTERN BLVD

5.0

0 01/01/91

01/01/91

3,750

100

01/02/92

03/01/92

01/02/92

01/01/91

01/02/92

03/01/92

01/02/92

01/01/91

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 180

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2384 / 8570

4905 S WOLCOTT AVE

4.0

11/18/95

11/18/95

0 11/18/95

11/18/95

3,000

100

805 06 2542 / 8728

4905 S WOOD ST

8.0

03/22/95

03/22/95

0 03/22/95

03/22/95

6,000

100

805 06 2459 / 8645

2399 W 49TH ST

22.0

12/01/91

12/01/91

0 12/01/91

12/01/91

16,500

100

805 06 2587 / 8773

2295 W 51ST ST

22.0

03/16/93

03/16/93

0 03/16/93

03/16/93

16,500

100

805 06 2155 / 8341

1600 W 53RD ST

37.0

11/01/97

11/01/97

0 11/01/97

11/01/97

27,750

100

805 06 2428 / 8614

2295 W 56TH ST

10.0

05/14/93

05/14/93

0 05/14/93

05/14/93

7,500

100

805 06 2452 / 8638

2295 W 56TH ST

22.0

05/14/93

05/14/93

0 05/14/93

05/14/93

16,500

100

300 06 0217 / 5337

1249 W 63RD ST

274.0

03/23/04

03/29/04

15,401 11/14/03

11/21/03

15,797

100

805 06 2099 / 8285

2098 W GARFIELD BLVD

12.0

04/06/93

04/06/93

0 04/06/93

04/06/93

9,000

100

805 06 2104 / 8290

2298 W GARFIELD BLVD

6.0

04/06/93

04/06/93

0 04/06/93

04/06/93

4,500

100

805 06 2109 / 8295

2298 W GARFIELD BLVD

3.0

04/06/93

04/06/93

0 04/06/93

04/06/93

2,250

100

805 06 2105 / 8291

2299 W GARFIELD BLVD

6.0

04/06/93

04/06/93

0 04/06/93

04/06/93

4,500

100

805 06 2107 / 8293

2299 W GARFIELD BLVD

3.0

04/06/93

04/06/93

0 04/06/93

04/06/93

2,250

100

Totals per Underpass Lighting

585.0

15,401

349,668

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 181

1/1/2008 AND 12/31/2008

Ward 16 Joann Thompson CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S CALIFORNIA AVE AND W 57TH ST

1.0

0 11/07/02

11/07/02

7,324

100

210 06 0219 / 4459

S WESTERN AVE AND W 51ST ST

.50

05/12/05

05/13/05

5,282 04/19/05

04/19/05

4,170

100

210 06 0219 / 4459

S WESTERN AVE AND W 54TH ST

.50

05/13/05

05/14/05

5,282 04/18/05

04/18/05

3,879

100

210 06 0219 / 4459

S WESTERN AVE AND W 59TH ST

1.0

05/17/05

05/18/05

10,563 04/14/05

04/14/05

9,046

100

210 06 0219 / 4459

S WESTERN AVE AND W 61ST ST

.50

05/18/05

05/19/05

5,282 04/13/05

04/13/05

4,035

100

210 06 0219 / 4459

W 55TH ST AND S WESTERN AVE

.50

05/16/05

05/17/05

5,282 04/15/05

04/15/05

4,523

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0073 / 4337

5900 S WESTERN AVE

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W 61ST ST AND S KEDZIE AVE

Work Type: Signals 300 06 0096 / 5258

1249 W 63RD ST

Work Type: TSM Install

4.0

31,689

32,977

Locations 1.0

05/01/02

06/01/02

50,000 07/02/02

08/01/02

61,544

100

03/15/06

05/08/07

6,000 02/22/07

03/20/07

2,491

100

09/16/03

09/21/03

0 08/20/03

09/05/03

6,483

100

Locations .0

Intersections 41.0

Locations

814 06 0227 / 16439

5000 S ASHLAND AVE

1.0

09/10/90

09/10/90

0 09/10/90

09/10/90

90,100

100

814 06 0292 / 16504

5300 S ASHLAND AVE

1.0

08/30/90

08/30/90

0 08/30/90

08/30/90

90,100

100

814 06 0338 / 16537

2000 W GARFIELD BLVD

1.0

01/01/96

01/01/96

0 01/01/96

03/11/98

175,000

100

3.0

0

355,200

87,689

458,695

Totals per Construction Phase

2,280,605

1,725,335

Totals for Ward 16

2,280,855

1,728,477

Totals per TSM Install Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 182

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON S BISHOP ST FROM W 65TH ST TO W 69TH ST

.0

04/01/08

08/30/08

0

0

0

300 06 0308 / 5414

ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,065

100

300 06 0308 / 5414

ON S MORGAN ST FROM W 79TH ST TO W 80TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,065

100

300 06 / 32021

7600-7900 S THROOP ST

.0

09/12/06

09/18/06

0 09/12/06

09/18/06

0

0

300 06 0292 / 5399

1610 W 71ST ST

.0

01/20/05

12/21/05

0 01/20/05

12/21/05

0

0

Totals per Design/Engineering

.0

0

2,130

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 183

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 11 / 32206

ON S EMERALD AVE FROM W 73RD ST TO W 74TH ST

5.0

10/21/07

10/21/07

2,200 10/21/07

10/21/07

2,200

100

300 06 0069 / 5233

7000 S ELIZABETH ST

4.0

09/29/02

09/29/02

840 09/26/02

09/26/02

812

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

9.0

3,040

3,012

Fixtures

300 06 0069 / 5233

7600 S RACINE AVE

11.0

01/12/03

01/12/03

4,400 01/09/03

01/09/03

4,125

100

300 06 0069 / 5233

1200 W 76TH ST

11.0

01/12/03

01/12/03

4,400 01/09/03

01/09/03

4,125

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

22.0

8,800

8,250

1,280,025

1,591,305

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 184

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0783 / 6969

6822 S ADA ST

1.0

02/07/96

02/07/96

0 02/07/96

02/07/96

300

100

805 06 1735 / 7921

6937 S ADA ST

1.0

06/10/97

06/10/97

0 06/10/97

06/10/97

300

100

805 06 0784 / 6970

7704 S ADA ST

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 1468 / 7654

7724 S ADA ST

2.0

12/03/97

12/03/97

0 12/03/97

12/03/97

600

100

805 06 1480 / 7666

7745 S ADA ST

1.0

11/28/97

11/28/97

0 11/28/97

11/28/97

300

100

805 06 0830 / 7016

6816 S CARPENTER ST

1.0

11/29/95

11/29/95

0 11/29/95

11/29/95

300

100

805 06 1460 / 7646

6840 S CLAREMONT AVE

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 2001 / 8187

7900 S LAFAYETTE AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 2003 / 8189

7702 S LAFLIN ST

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 1873 / 8059

6822 S LOOMIS BLVD

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 1852 / 8038

7200 S LOWE AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 1864 / 8050

7351 S MARSHFIELD AVE

1.0

06/15/95

06/15/95

0 06/15/95

06/15/95

300

100

805 06 1867 / 8053

7532 S MARSHFIELD AVE

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 1807 / 7993

7512 S MAY ST

1.0

07/30/96

07/30/96

0 07/30/96

07/30/96

300

100

805 06 1808 / 7994

7530 S MAY ST

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

805 06 1809 / 7995

7937 S MAY ST

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 1659 / 7845

6627 S MORGAN ST

1.0

08/01/97

08/01/97

0 08/01/97

08/01/97

300

100

805 06 1943 / 8129

7502 S MORGAN ST

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 1795 / 7981

7928 S MORGAN ST

1.0

04/08/97

04/08/97

0 04/08/97

04/08/97

300

100

805 06 1909 / 8095

7919 S NORMAL AVE

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 0582 / 6768

7500 S PARNELL AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 0628 / 6814

7941 S PARNELL AVE

1.0

04/27/95

04/27/95

0 04/27/95

04/27/95

300

100

805 06 0553 / 6739

7634 S PEORIA ST

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 0549 / 6735

7340 S PRINCETON AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 0583 / 6769

7430 S PRINCETON AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

300 06 0139 / 5289

7811 S RACINE AVE

1,775.0

03/01/06

09/01/06

41,106 06/27/06

07/14/06

53,630

100

302 00 0092 / 5774

7811 S RACINE AVE

39.0

0 01/03/01

12/31/01

9,190

100

805 06 0683 / 6869

7817 S RACINE AVE

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 0427 / 6613

7733 S THROOP ST

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 0347 / 6533

7652 S UNION AVE

1.0

10/29/96

10/29/96

0 10/29/96

10/29/96

300

100

805 06 1203 / 7389

7320 S VINCENNES AVE

1.0

12/19/97

12/19/97

0 12/19/97

12/19/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 185

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0540 / 6726

8018 S WENTWORTH AVE

302 00 0083 / 5768

6705 S WESTERN AVE

805 06 1259 / 7445

6705 S WESTERN AVE

1.0

12/05/97

805 06 1524 / 7710

7941 S YALE AVE

1.0

11/04/97

302 00 0083 / 5768

1632 W 69TH ST

805 06 1455 / 7641

1632 W 69TH ST

302 00 0083 / 5768

1734 W 69TH ST

805 06 1428 / 7614

1734 W 69TH ST

302 00 0083 / 5768

1830 W 69TH ST

805 06 1430 / 7616

1830 W 69TH ST

302 00 0083 / 5768

1934 W 69TH ST

805 06 1432 / 7618

1934 W 69TH ST

302 00 0083 / 5768

2135 W 69TH ST

805 06 1414 / 7600

2135 W 69TH ST

302 00 0083 / 5768

2226 W 69TH ST

805 06 1415 / 7601

2226 W 69TH ST

302 00 0083 / 5768

2336 W 69TH ST

805 06 1419 / 7605

2336 W 69TH ST

302 00 0083 / 5768

2337 W 69TH ST

805 06 1421 / 7607

2337 W 69TH ST

302 00 0083 / 5768

2057 W 71ST ST

805 06 1412 / 7598

2057 W 71ST ST

1.0

12/05/97

805 06 1012 / 7198

1214 W 72ND ST

1.0

805 06 0981 / 7167

1252 W 72ND ST

805 06 1014 / 7200

1.0

0 09/13/96

09/13/96

300

100

0 12/12/97

12/12/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

11/04/97

0 11/04/97

11/04/97

300

100

0 09/09/97

09/09/97

266

100

0 12/05/97

12/05/97

300

100

0 09/09/97

09/09/97

266

100

0 12/05/97

12/05/97

300

100

0 09/09/97

09/09/97

266

100

0 12/05/97

12/05/97

300

100

0 09/09/97

09/09/97

266

100

0 12/05/97

12/05/97

300

100

0 11/07/97

11/07/97

267

100

0 12/05/97

12/05/97

300

100

0 11/07/97

11/07/97

267

100

0 12/05/97

12/05/97

300

100

0 11/07/97

11/07/97

267

100

0 12/05/97

12/05/97

300

100

0 11/07/97

11/07/97

267

100

0 12/05/97

12/05/97

300

100

0 12/12/97

12/12/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

1.0

08/29/95

08/29/95

0 08/29/95

08/29/95

300

100

1435 W 72ND ST

1.0

01/03/97

01/03/97

0 01/03/97

01/03/97

300

100

805 06 1015 / 7201

1460 W 72ND ST

1.0

01/03/97

01/03/97

0 01/03/97

01/03/97

300

100

805 06 1018 / 7204

1200 W 74TH PL

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 1020 / 7206

304 W 75TH ST

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 0998 / 7184

1515 W 77TH ST

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

805 06 0999 / 7185

1364 W 79TH ST

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1001 / 7187

450 W 80TH ST

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

09/13/96

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

09/13/96

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 186

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1047 / 7233

514 W 80TH ST

302 00 0083 / 5768

2431 W LITHUANIAN PLAZA CT

805 06 1424 / 7610

2431 W LITHUANIAN PLAZA CT

1.0

12/05/97

805 06 1879 / 8065

958 W MARQUETTE RD

1.0

10/29/96

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

7811 S RACINE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

7811 S RACINE AVE

Work Type: Flood Light Install 300 06 0167 / 5306

S ARTESIAN AVE AND W 70TH ST

Work Type: Lighting Imprvmnts 281 00 / 32154

7600-7900 S THROOP ST

Work Type: Lighting Imprvmnts

1.0

04/27/95

04/27/95

0 04/27/95

04/27/95

300

100

0 11/07/97

11/07/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

10/29/96

0 10/29/96

10/29/96

300

100

1,868.0

41,106

81,953

Lamps 3,029.0

06/01/07

12/31/07

89,173 12/05/07

12/12/07

86,477

100

0 08/07/02

08/26/02

53,423

100

0 01/06/99

01/06/99

176

100

0 12/08/06

12/31/06

0

0

Installations 2,934.0

Fixtures .50

Blocks .0

12/08/06

12/31/06

Installations

300 06 0256 / 5366

ON W 75TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE

6.0

02/15/04

08/01/04

9,400 07/06/04

05/16/05

12,237

100

300 06 0292 / 5399

1610 W 71ST ST

4.0

03/17/06

05/05/06

52,000 03/17/06

05/05/06

33,180

100

Project,100% Note Last Updated on 01-SEP-06 Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

10.0

61,400

45,417

Fixtures

281 00 / 33664

6832-7100 S DAMEN AVE

32.0

08/25/08

09/26/08

0

0

0

281 00 / 33664

1400-2000 W 71ST ST

46.0

08/25/08

09/26/08

0

0

0

0

0

0

0

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

7811 S RACINE AVE

78.0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 187

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting 300 06 / 32277

ON S BISHOP ST FROM W 65TH ST TO W 69TH ST

300 06 0308 / 5414

ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST

300 07 0017 / 5440 300 07 0017 / 5440 300 06 0298 / 5405

Blocks .0

05/04/08

12/31/08

1.0

08/26/06

10/06/06

ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST

.0

03/01/06

12/31/06

ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST

.0

03/01/06

12/31/06

ON S MORGAN ST FROM W 69TH ST TO W 71ST ST

2.0

06/20/05

07/20/05

0 09/26/05

300 06 0308 / 5414

ON S MORGAN ST FROM W 79TH ST TO W 80TH ST

1.0

07/25/06

09/15/06

95,280 08/02/06

300 07 0017 / 5440

ON S PAULINA ST FROM W 77TH ST TO W 79TH ST

2.0

04/18/06

11/18/06

170,000 10/17/06

300 07 0017 / 5440

ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST

.0

03/01/06

12/31/06

300 07 0017 / 5440

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

300 07 0017 / 5440

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

300 07 0017 / 5440

ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE

.0

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0

0

79,748

100

0

0

0

0

0

0

12/20/05

104,200

100

10/06/06

79,748

100

0

60

0

0

0

12/31/06

0

0

0

03/01/06

12/31/06

0

0

0

03/01/06

12/31/06

0

0

0

360,530

263,696

6.0

0 95,250 08/02/06

10/06/06

Blocks

300 06 0232 / 5346

ON S MAY ST FROM W 69TH ST TO W 70TH ST

2.0

12/28/02

02/28/03

205,000 01/06/03

02/24/03

171,034

100

300 06 0235 / 5349

ON S MORGAN ST FROM W 75TH ST TO W 77TH ST

2.0

08/20/03

09/20/03

143,499 08/18/03

10/31/03

135,346

100

300 06 0267 / 5375

ON S MORGAN ST FROM W 77TH ST TO W 79TH ST

2.0

06/10/04

08/10/04

158,277 06/18/04

09/30/04

140,281

100

300 06 0069 / 5233

ON S PEORIA ST FROM W 64TH ST TO W 66TH ST

1.0

12/15/04

02/28/05

60,000 11/01/04

03/29/05

45,201

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 06 / 32021

7600-7900 S THROOP ST

Work Type: Short Arm Installs - Residntl

7.0

566,776

491,862

Installations .0

09/18/06

09/29/06

0 09/18/06

09/29/06

0

0

Locations

302 00 0092 / 5774

7739 S EMERALD AVE

1.0

0 03/13/01

03/13/01

378

100

302 00 0092 / 5774

7740 S EMERALD AVE

1.0

0 03/13/01

03/13/01

378

100

302 00 0092 / 5774

7746 S EMERALD AVE

1.0

0 03/13/01

03/13/01

378

100

302 00 0092 / 5774

748 W 78TH ST

1.0

0 06/12/01

06/12/01

378

100

4.0

0

Totals per Short Arm Installs - Residntl

1,512

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 188

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 07 0017 / 5440

ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST

32.0

04/18/06

11/18/06

8,000

300 11 / 32206

ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST

32.0

05/01/07

05/15/07

8,000 05/01/07

300 07 0017 / 5440

ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST

.0

03/01/06

12/31/06

300 07 0017 / 5440

ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST

.0

03/01/06

12/31/06

300 04 0216 / 5114

ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST

14.0

05/01/06

11/01/06

300 07 0017 / 5440

ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST

.0

03/01/06

12/31/06

300 07 0017 / 5440

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

12/31/06

300 07 0017 / 5440

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

03/01/06

300 07 0017 / 5440

ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE

56.0

300 11 / 32206

ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE

302 00 0075 / 5763 302 00 0076 / 5764

0

0

8,000

100

0

0

0

0

0

0

3,028

100

0

0

0

0

0

0

12/31/06

0

0

0

04/18/06

11/18/06

14,000

0

0

56.0

05/01/07

05/15/07

14,000 05/01/07

05/15/07

14,000

100

ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE

55.0

04/01/97

10/01/97

4,620 04/01/98

08/01/99

4,620

100

ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE

78.0

02/19/98

02/24/98

0 02/19/98

02/24/98

1,326

100

302 00 0076 / 5764

ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE

38.54

06/27/98

06/30/98

0 06/27/98

06/30/98

655

100

300 07 0017 / 5440

ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE

46.0

04/18/06

11/18/06

11,500 04/13/07

05/15/07

0

100

300 11 / 32206

ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE

46.0

05/01/07

05/15/07

11,500 05/01/07

05/15/07

11,500

100

300 07 0017 / 5440

ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE

.0

03/01/06

12/31/06

0

0

0

74,648

43,129

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 300 06 0117 / 5271

7600-7699 S YALE AVE

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

7811 S RACINE AVE

453.54

3,028 05/17/06

05/15/07

07/01/06

Blocks 1.0

40,000 12/20/99

01/05/00

17,194

100

8,471 07/31/06

08/23/06

17,740

100

Lamps 1,629.0

03/01/04

12/01/04

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 189

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2308 / 8494

7401 S ASHLAND AVE

22.0

05/20/96

05/20/96

0 05/20/96

05/20/96

16,500

100

805 06 2333 / 8519

7405 S DAMEN AVE

16.0

03/16/93

03/16/93

0 03/16/93

03/16/93

12,000

100

302 00 0072 / 5760

7500 S EMERALD AVE

1.0

0 04/21/00

04/24/00

2,800

100

302 00 0072 / 5760

7500 S HALSTED ST

1.0

0 04/19/00

05/08/00

13,000

100

805 06 2251 / 8437

7401 S LOOMIS BLVD

10.0

01/05/93

01/05/93

0 01/05/93

01/05/93

7,500

100

805 06 2606 / 8792

7401 S LOWE AVE

22.0

09/10/91

09/10/91

0 09/10/91

09/10/91

16,500

100

805 06 2555 / 8741

7495 S MORGAN ST

18.0

02/02/93

02/02/93

0 02/02/93

02/02/93

13,500

100

805 06 2554 / 8740

7505 S PEORIA ST

32.0

01/28/93

01/28/93

0 01/28/93

01/28/93

24,000

100

805 06 2250 / 8436

7501 S RACINE AVE

24.0

10/24/96

10/24/96

0 10/24/96

10/24/96

18,000

100

300 06 0217 / 5337

7811 S RACINE AVE

464.0

03/05/04

03/11/04

26,081 11/24/03

12/01/03

19,989

100

805 06 2552 / 8738

7405 S UNION AVE

18.0

07/22/93

07/22/93

0 07/22/93

07/22/93

13,500

100

805 06 2553 / 8739

7405 S UNION AVE

10.0

07/22/93

07/22/93

0 07/22/93

07/22/93

7,500

100

302 00 0071 / 5759

2150 W 68TH ST

0 10/10/98

10/20/98

24,830

100

805 06 2245 / 8431

2219 W 68TH ST

21.0

01/27/92

01/27/92

0 01/27/92

01/27/92

15,750

100

805 06 2386 / 8572

2219 W 69TH ST

78.0

02/14/96

02/14/96

0 02/14/96

02/14/96

58,500

100

805 06 2605 / 8791

599 W 72ND ST

22.0

05/31/95

05/31/95

0 05/31/95

05/31/95

16,500

100

805 06 2600 / 8786

435 W 74TH ST

14.0

01/01/91

01/01/91

0 01/01/91

01/01/91

10,500

100

805 06 2624 / 8810

501 W 75TH ST

16.0

02/02/94

02/02/94

0 02/02/94

02/02/94

12,000

100

302 00 0072 / 5760

500 W 76TH ST

1.0

0 01/18/00

02/04/00

11,350

100

805 06 2623 / 8809

501 W 76TH ST

14.0

0 09/27/91

09/27/91

10,500

100

302 00 0072 / 5760

600 W 76TH ST

1.0

0 02/02/00

02/21/00

19,995

100

805 06 2603 / 8789

631 W 76TH ST

26.0

12/01/91

12/01/91

0 12/01/91

12/01/91

19,500

100

805 06 2601 / 8787

555 W 78TH ST

32.0

01/12/94

01/12/94

0 01/12/94

01/12/94

24,000

100

805 06 2599 / 8785

551 W 79TH ST

22.0

10/19/93

10/19/93

0 10/19/93

10/19/93

16,500

100

805 06 2095 / 8281

536 W 80TH ST

15.0

02/21/94

02/21/94

0 02/21/94

02/21/94

11,250

100

805 06 2096 / 8282

536 W 80TH ST

25.0

02/25/94

02/25/94

0 02/25/94

02/25/94

18,750

100

805 06 2321 / 8507

426 W 81ST ST

10.0

05/13/96

05/13/96

0 05/13/96

05/13/96

7,500

100

805 06 2346 / 8532

426 W 81ST ST

17.0

05/13/96

05/13/96

0 05/13/96

05/13/96

12,750

100

805 06 2244 / 8430

2223 W MARQUETTE RD

30.0

10/02/96

10/02/96

0 10/02/96

10/02/96

22,500

100

Totals per Underpass Lighting

982.0

09/27/91

09/27/91

26,081

477,464

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 190

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S ASHLAND AVE AND W 71ST ST

1.0

05/05/05

05/05/05

10,653 05/16/05

05/20/05

10,084

210 06 0219 / 4459

S ASHLAND AVE AND W MARQUETTE RD

.50

05/06/05

05/06/05

5,327 07/01/05

07/05/05

0

210 06 0219 / 4459

S WESTERN AVE AND W 69TH ST

1.0

05/24/05

05/25/05

10,563 04/08/05

04/08/05

8,007

100

210 06 0219 / 4459

S WESTERN AVE AND W 71ST ST

.50

05/25/05

05/26/05

5,282 04/07/05

04/07/05

5,403

100

210 06 0219 / 4459

S WESTERN AVE AND W MARQUETTE RD

.50

05/23/05

05/24/05

5,282 03/25/05

03/25/05

4,004

100

Totals per LED Signal Head Install

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

S VINCENNES AVE AND W 79TH ST

Work Type: Signals 300 06 0096 / 5258

7811 S RACINE AVE

Work Type: TSM Install

3.50

37,106

100

27,498

Crossings 1.0

4,000 05/02/01

05/08/01

5,636

100

Intersections 33.0

08/08/03

08/12/03

0 08/07/03

08/13/03

5,218

100

Locations

814 06 0388 / 16576

7600 S HALSTED ST

1.0

12/15/95

12/15/95

0 12/15/95

12/15/95

137,995

100

210 06 0065 / 4330

7800 S HALSTED ST

1.0

02/15/99

04/30/99

0 02/15/99

04/15/99

126,808

100

271 00 0045 / 4794

7100 S WESTERN AVE

1.0

0 08/01/97

08/15/99

201,000

3.0

0

465,803

Totals per TSM Install

Work Type: Traffic Equipment Painting

Locations

300 07 0017 / 5440

ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON W 68TH ST FROM S WOOD ST TO S HONORE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE

2.0

04/18/06

11/18/06

5,800

0

0

300 11 / 32206

ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE

2.0

05/01/07

05/15/07

5,800 05/01/07

5,800

100

300 07 0017 / 5440

ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE

.0

03/01/06

12/31/06

0

0

0

11,600

5,800

52,706

509,955

1,332,731

2,101,259

Totals per Traffic Equipment Painting Totals per Traffic Totals per Construction Phase

4.0

05/15/07

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 191

1/1/2008 AND 12/31/2008

Ward 17 Latasha R. Thomas CIP/CPM Number Totals for Ward 17

Street Address

No of Units

Start

WIP Estimate End

Cost 1,332,731

Start

WIP Actual (to Date) End

Cost 2,103,389

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 192

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0274 / 5382

ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

3,796

100

300 06 0274 / 5382

ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST

.0

07/01/04

12/31/04

0 03/22/05

05/06/05

3,796

100

300 06 0274 / 5382

ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST

.0

07/01/04

12/31/04

0 03/22/05

05/06/05

3,796

100

300 06 0274 / 5382

ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

3,796

100

300 06 0274 / 5382

ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

3,796

100

300 06 0274 / 5382

ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST

.0

07/01/04

12/31/04

0 07/01/04

12/31/04

3,796

100

300 06 0274 / 5382

ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE

.0

07/01/04

12/31/04

0 03/22/05

05/06/05

3,796

100

300 06 / 32146

ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE

.0

05/01/07

10/31/07

1,950 06/21/07

07/19/07

1,000

100

300 06 0292 / 5399

1630 W 87TH ST

1.0

05/27/05

06/14/05

2,000 05/27/05

06/14/05

1,667

100

300 06 0292 / 5399

3811 W COLUMBUS AVE

1.0

1,000 05/23/05

06/23/05

0

100

2.0

4,950

Totals per Design/Engineering

29,239

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 193

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0018 / 5441

ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST

8.0

04/18/06

11/18/06

1,200

300 05 0018 / 5133

ON S HAMILTON AVE FROM W 83RD ST TO W 84TH ST

4.0

04/04/05

11/18/05

1,700 07/09/05

300 07 0018 / 5441

ON S HERMITAGE AVE FROM W 86TH ST TO W 87TH ST

5.0

01/19/07

01/31/07

300 07 0018 / 5441

ON S HONORE ST FROM W 79TH ST TO W 82ND ST

4.10

04/18/06

11/18/06

300 06 0069 / 5233

ON S HOYNE AVE FROM W 79TH PL TO W 80TH PL

7.0

11/16/02

11/16/02

1,470 11/13/02

300 05 0018 / 5133

ON S MAPLEWOOD AVE FROM W 71ST ST TO W 72ND ST

5.0

04/04/05

11/18/05

2,100 07/09/05

300 07 0018 / 5441

ON S MAPLEWOOD AVE FROM W 74TH ST TO W COLUMBUS AVE

3.0

04/18/06

11/18/06

1,200

300 06 0069 / 5233

ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST

4.0

300 03 0018 / 4889

ON S PAULINA ST FROM W 82ND ST TO W 83RD ST

4.0

10/01/04

300 07 0018 / 5441

ON S SACRAMENTO AVE FROM W 73RD ST TO W 74TH ST

4.0

01/19/07

300 07 0018 / 5441

ON S ST LOUIS AVE FROM W 84TH ST TO W 85TH ST

3.0

300 05 0018 / 5133

ON S TRUMBULL AVE FROM W 79TH ST TO W 80TH ST

300 03 0018 / 4889 300 07 0018 / 5441

0

0

1,036

100

2,000

0

0

5,200

0

0

11/13/02

1,421

100

07/15/05

1,295

100

07/15/05

0

0

1,500 05/06/02

05/06/02

1,500

100

10/01/04

1,700 10/20/04

10/20/04

1,547

100

01/31/07

1,600

0

0

01/19/07

01/31/07

1,200

0

0

4.0

04/04/05

11/18/05

1,700 07/09/05

1,036

100

ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE

5.0

12/01/04

12/31/04

2,075

0

ON W 78TH PL FROM S ST LOUIS AVE TO S CENTRAL PARK AVE

4.0

04/18/06

11/18/06

1,600

0

300 07 0018 / 5441

ON W 78TH ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE

4.0

04/18/06

11/18/06

1,600

0

0

300 06 0069 / 5233

ON W 80TH PL FROM S HOYNE AVE TO S DAMEN AVE

4.0

11/16/02

11/16/02

840 11/13/02

11/13/02

812

100

300 05 0018 / 5133

ON W 80TH PL FROM S OAKLEY AVE TO S WESTERN AVE

3.0

04/04/05

11/18/05

1,300 07/09/05

07/15/05

777

100

300 07 0018 / 5441

ON W 83RD PL FROM S SPAULDING AVE TO S HOMAN AVE

4.0

01/19/07

01/31/07

1,600 01/19/07

01/31/07

1,600

100

300 07 0018 / 5441

ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE

5.0

01/19/07

01/31/07

2,000 01/19/07

01/31/07

2,000

100

300 07 0018 / 5441

W 80TH ST AND S WESTERN AVE

8.0

04/18/06

11/18/06

3,200

0

0

300 07 0018 / 5441

W 84TH PL AND S ST LOUIS AVE

3.0

01/19/07

01/31/07

1,200

0

0

302 00 0092 / 5774

7103-7155 S ARTESIAN AVE

5.0

0 12/19/01

12/19/01

1,029

100

302 00 0092 / 5774

7221-7225 S ARTESIAN AVE

5.0

0 07/14/01

07/14/01

1,029

100

302 00 0092 / 5774

7101 S FAIRFIELD AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

7113 S FAIRFIELD AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

7129 S FAIRFIELD AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

7135 S FAIRFIELD AVE

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

7149 S FAIRFIELD AVE

1.0

0 11/12/01

11/12/01

206

100

300 06 0069 / 5233

8300 S FRANCISCO AVE

300 06 0069 / 5233 300 06 0069 / 5233

07/15/05

0

21.0

11/04/02

11/04/02

8,400 11/01/02

11/01/02

4,748

100

7359 S MAPLEWOOD AVE

1.0

11/15/02

11/15/02

210 11/12/02

11/12/02

203

100

7200 S OAKLEY AVE

5.0

03/25/02

03/25/02

1,050 03/22/02

03/22/02

1,015

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 194

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

7100-7199 S ROCKWELL ST

5.0

1,029 09/29/01

09/29/01

1,029

100

302 00 0092 / 5774

2300 W 72ND ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

2136 W 84TH ST

2.0

0 10/17/01

10/17/01

412

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 06 0069 / 5233

ON S PULASKI RD FROM W 55TH ST TO W 83RD ST

300 11 / 32207

ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE

Totals per 400 Watt Changeout Totals per Lighting/Electrical

10/19/01

10/19/01

145.10

48,674

23,725

Fixtures 245.0 44.0 289.0

01/01/08

01/21/08

98,000 08/02/02

08/23/02

49,240

100

17,600 11/30/07

02/19/08

8,500

100

115,600

57,740

2,562,083

2,282,486

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 195

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0083 / 5768

7156 S ARTESIAN AVE

805 06 1233 / 7419

7156 S ARTESIAN AVE

302 00 0083 / 5768

7351 S CALIFORNIA AVE

805 06 1238 / 7424

7351 S CALIFORNIA AVE

302 00 0083 / 5768

7156 S CAMPBELL AVE

805 06 1234 / 7420

7156 S CAMPBELL AVE

302 00 0083 / 5768

7422 S CAMPBELL AVE

805 06 1240 / 7426

7422 S CAMPBELL AVE

1.0

302 00 0092 / 5774

7701 S CHRISTIANA AVE

1.0

302 00 0083 / 5768

7133 S CLAREMONT AVE

805 06 1232 / 7418

7133 S CLAREMONT AVE

302 00 0083 / 5768

7056 S FAIRFIELD AVE

805 06 1231 / 7417

7056 S FAIRFIELD AVE

1.0

12/05/97

805 06 1660 / 7846

8116 S FAIRFIELD AVE

1.0

805 06 1685 / 7871

8224 S FAIRFIELD AVE

805 06 1174 / 7360

8130 S HOMAN AVE

302 00 0083 / 5768

7737 S KEDZIE AVE

805 06 1244 / 7430

7737 S KEDZIE AVE

1.0

12/05/97

300 06 0139 / 5289

8146 S KEDZIE AVE

2,075.0

03/01/06

302 00 0092 / 5774

8146 S KEDZIE AVE

27.0

805 06 1182 / 7368

8362 S KENTON AVE

1.0

03/12/95

805 06 2034 / 8220

8559 S KILDARE AVE

1.0

805 06 1993 / 8179

8521 S KNOX AVE

805 06 0676 / 6862

0 10/30/97

10/30/97

267

100

0 12/05/97

12/05/97

300

100

0 10/30/97

10/30/97

267

100

0 12/05/97

12/05/97

300

100

0 10/30/97

10/30/97

266

100

0 12/05/97

12/05/97

300

100

0 10/30/97

10/30/97

266

100

0 12/05/97

12/05/97

300

100

0 06/29/01

06/29/01

236

100

0 10/30/97

10/30/97

266

100

0 12/05/97

12/05/97

300

100

0 10/15/97

10/15/97

266

100

12/05/97

0 12/05/97

12/05/97

300

100

08/04/97

08/04/97

0 08/04/97

08/04/97

300

100

1.0

06/25/97

06/25/97

0 06/25/97

06/25/97

300

100

1.0

04/04/95

04/04/95

0 04/04/95

04/04/95

300

100

0 10/15/97

10/15/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

09/01/06

47,602 02/01/06

03/16/06

62,694

100

0 01/31/01

01/25/02

6,363

100

03/12/95

0 03/12/95

03/12/95

300

100

09/15/95

09/15/95

0 09/15/95

09/15/95

300

100

1.0

02/01/95

02/01/95

0 02/01/95

02/01/95

300

100

8021 S SACRAMENTO AVE

1.0

10/04/96

10/04/96

0 10/04/96

10/04/96

300

100

805 06 0674 / 6860

8039 S SACRAMENTO AVE

1.0

08/08/96

08/08/96

0 08/08/96

08/08/96

300

100

805 06 0720 / 6906

8102 S SACRAMENTO AVE

1.0

05/23/96

05/23/96

0 05/23/96

05/23/96

300

100

805 06 0407 / 6593

7656 S SPRINGFIELD AVE

1.0

09/23/96

09/23/96

0 09/23/96

09/23/96

300

100

302 00 0083 / 5768

7351 S TALMAN AVE

0 12/09/97

12/09/97

267

100

805 06 1239 / 7425

7351 S TALMAN AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

7714 S TROY ST

0 09/05/97

09/05/97

267

100

805 06 1241 / 7427

7714 S TROY ST

0 12/05/97

12/05/97

300

100

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 196

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0083 / 5768

7719 S TROY ST

805 06 1242 / 7428

7719 S TROY ST

302 00 0083 / 5768

7727 S TROY ST

805 06 1243 / 7429

7727 S TROY ST

1.0

12/05/97

805 06 0374 / 6560

7700 S TRUMBULL AVE

1.0

805 06 0375 / 6561

7818 S TRUMBULL AVE

1.0

302 00 0083 / 5768

7036 S WASHTENAW AVE

805 06 1260 / 7446

7036 S WASHTENAW AVE

1.0

12/05/97

805 06 0508 / 6694

7937 S WASHTENAW AVE

1.0

01/03/95

302 00 0083 / 5768

7209 S WESTERN AVE

805 06 1235 / 7421

7209 S WESTERN AVE

302 00 0083 / 5768

7247 S WESTERN AVE

805 06 1236 / 7422

7247 S WESTERN AVE

1.0

12/05/97

805 06 0522 / 6708

8118 S WESTERN AVE

1.0

805 06 0437 / 6623

7712 S WOLCOTT AVE

805 06 0438 / 6624

7718 S WOLCOTT AVE

302 00 0083 / 5768

2634 W 71ST ST

805 06 1406 / 7592

2634 W 71ST ST

302 00 0083 / 5768

3201 W 71ST ST

805 06 1410 / 7596

3201 W 71ST ST

302 00 0083 / 5768

2305 W 72ND ST

805 06 1417 / 7603

2305 W 72ND ST

302 00 0083 / 5768

2442 W 74TH ST

805 06 1398 / 7584

2442 W 74TH ST

1.0

12/05/97

805 06 0992 / 7178

3401 W 76TH PL

1.0

805 06 0993 / 7179

3457 W 76TH PL

805 06 0994 / 7180

0 09/05/97

09/05/97

267

100

0 12/05/97

12/05/97

300

100

0 09/05/97

09/05/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

05/08/95

05/08/95

0 05/08/95

05/08/95

300

100

0 12/12/97

12/12/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

01/03/95

0 01/03/95

01/03/95

300

100

0 12/12/97

12/12/97

266

100

0 12/05/97

12/05/97

300

100

0 12/12/97

12/12/97

266

100

12/05/97

0 12/05/97

12/05/97

300

100

01/10/96

01/10/96

0 01/10/96

01/10/96

300

100

1.0

09/26/96

09/26/96

0 09/26/96

09/26/96

300

100

1.0

09/26/96

09/26/96

0 09/26/96

09/26/96

300

100

0 12/12/97

12/12/97

267

100

0 12/05/97

12/05/97

300

100

0 12/12/97

12/12/97

267

100

0 12/05/97

12/05/97

300

100

0 12/12/97

12/12/97

267

100

0 12/05/97

12/05/97

300

100

0 12/12/97

12/12/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

02/22/95

02/22/95

0 02/22/95

02/22/95

300

100

1.0

02/22/95

02/22/95

0 02/22/95

02/22/95

300

100

3501 W 76TH PL

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

300

100

805 06 0995 / 7181

3832 W 76TH PL

1.0

12/13/95

12/13/95

0 12/13/95

12/13/95

300

100

805 06 0774 / 6960

2153 W 82ND PL

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

805 06 0773 / 6959

3517 W 82ND PL

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 0775 / 6961

2037 W 82ND ST

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 197

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0776 / 6962

2604 W 83RD ST

1.0

04/23/96

04/23/96

0 04/23/96

04/23/96

300

100

805 06 0777 / 6963

3740 W 83RD ST

1.0

10/17/95

10/17/95

0 10/17/95

10/17/95

300

100

805 06 0763 / 6949

3626 W 85TH PL

1.0

11/23/96

11/23/96

0 11/23/96

11/23/96

300

100

805 06 0772 / 6958

3720 W 85TH ST

1.0

04/23/96

04/23/96

0 04/23/96

04/23/96

300

100

805 06 1646 / 7832

3821 W 86TH PL

1.0

09/08/97

09/08/97

0 09/08/97

09/08/97

300

100

805 06 0753 / 6939

4742 W 87TH ST

1.0

03/20/97

03/20/97

0 03/20/97

03/20/97

300

100

805 06 1556 / 7742

3235 W COLUMBUS AVE

1.0

04/19/95

04/19/95

0 04/19/95

04/19/95

300

100

805 06 1723 / 7909

2706 W SEIPP ST

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1520 / 7706

2720 W SEIPP ST

1.0

10/31/97

10/31/97

0 10/31/97

10/31/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

8146 S KEDZIE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

8146 S KEDZIE AVE

Work Type: Flood Light Install

2,153.0

47,602

89,093

Lamps 1,992.0

06/01/07

12/31/07

58,644 12/14/07

12/21/07

56,871

100

0 08/15/02

08/30/02

33,812

100

Installations 1,857.0

Fixtures

300 06 0167 / 5306

W 83RD ST AND S KOSTNER AVE

6.0

0 07/22/99

07/22/99

1,523

100

300 06 0167 / 5306

W 83RD ST AND S SCOTTSDALE AVE

3.0

0 12/02/99

12/02/99

470

100

300 06 0167 / 5306

W 84TH ST AND S KOLIN AVE

8.0

0 12/02/99

12/02/99

1,316

100

300 06 0167 / 5306

W 86TH ST AND S KEDVALE AVE

2.0

0 09/20/99

09/20/99

702

100

302 00 0092 / 5774

8300 S HAMILTON AVE

1.0

0 10/17/01

10/17/01

404

100

302 00 0092 / 5774

8338 S HAMILTON AVE

1.0

0 10/17/01

10/17/01

345

100

302 00 0092 / 5774

8358 S HAMILTON AVE

1.0

0 10/17/01

10/17/01

345

100

300 06 0071 / 5234

6734 S KEDZIE AVE

0 11/22/00

11/30/00

17,100

100

302 00 0092 / 5774

8401 S KOMENSKY AVE

1.0

0 04/05/01

04/05/01

471

100

302 00 0092 / 5774

7820 S OAKLEY AVE

1.0

0 04/05/01

04/05/01

471

100

302 00 0092 / 5774

2135 W 84TH ST

1.0

0 01/17/01

01/17/01

404

100

Totals per Flood Light Install

11/23/00

25.0

11/25/00

0

23,551

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 198

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Lighting Imprvmnts 300 06 0150 / 5291

ON S KEDZIE AVE FROM W 76TH ST TO W 71ST ST

Work Type: Lighting Imprvmnts

3.0

07/01/03

10/01/04

385,000 05/29/03

306,152

70

Installations

300 06 0302 / 5408

3330 W 71ST ST

1.0

06/01/05

09/30/05

25,337 07/01/05

08/02/05

10,208

100

300 06 0292 / 5399

1630 W 87TH ST

.0

03/01/05

12/31/05

9,407 07/09/05

08/16/05

9,149

100

300 06 0292 / 5399

3811 W COLUMBUS AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting 300 11 / 32207

ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE

300 06 0122 / 5275

ON W COLUMBUS AVE FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

8146 S KEDZIE AVE

Work Type: Residntl Staggered Lighting

1.0

34,744

19,357

Fixtures 44.0

01/01/08

01/21/08

59,400 11/30/07

02/19/08

38,025

100

8.0

11/01/03

11/07/03

9,600 10/30/03

10/30/03

10,787

100

52.0

69,000

48,812

Lamps .0

03/01/08

12/01/08

0

0

0

0

Blocks

300 07 0017 / 5440

ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST

.0

03/01/06

12/31/06

0

0

300 07 0017 / 5440

ON S MOZART ST FROM W 82ND ST TO W 83RD ST

.0

03/01/06

12/31/06

0

0

0

300 06 / 32146

ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE

2.0

12/05/07

04/29/08

158,512

0

50

300 06 0298 / 5405

ON W 83RD ST FROM S DAMEN AVE TO S LEAVITT ST

2.0

05/01/05

06/15/05

98,623

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

4.0

0 06/06/05

07/29/05

158,512

98,623

Blocks

300 06 0122 / 5275

ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE

1.0

05/01/03

07/01/03

106,250 04/22/03

06/30/03

106,250

100

300 06 0235 / 5349

ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE

2.0

05/01/03

08/01/03

75,243 03/14/03

06/06/03

69,065

100

300 06 0267 / 5375

ON W 83RD ST FROM S PULASKI RD TO S HAMLIN AVE

2.0

04/01/04

06/01/04

170,337 04/19/04

07/19/04

160,844

100

300 06 0235 / 5349

ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE

2.0

05/01/03

07/01/03

77,102 04/22/03

06/30/03

69,065

100

Totals per Residntl Strt Lighting/Lamps

7.0

428,932

405,224

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 199

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

7200 S MOZART ST

1.0

0 03/07/01

03/07/01

378

100

302 00 0092 / 5774

7300 S MOZART ST

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

2300 W 72ND ST

1.0

0 06/15/01

06/15/01

378

100

3.0

0

Totals per Short Arm Installs - Residntl

1,134

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 200

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 07 0017 / 5440

ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST

.0

03/01/06

12/31/06

0

0

300 03 0018 / 4889

ON S CALIFORNIA AVE FROM W 83RD ST TO W 87TH ST

35.0

05/01/05

05/31/05

7,643

0

300 07 0018 / 5441

ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST

3.0

04/18/06

11/18/06

600 12/01/06

12/04/06

0

100

300 05 0018 / 5133

ON S FRANCISCO AVE FROM W SEIPP ST TO W 87TH ST

9.0

07/25/05

08/15/05

1,000 07/25/05

08/15/05

1,154

100

300 05 0018 / 5133

ON S KOLMAR AVE FROM W 85TH ST TO W 86TH ST

5.0

04/04/05

11/18/05

1,000 07/25/05

08/15/05

721

100

300 07 0017 / 5440

ON S MOZART ST FROM W 82ND ST TO W 83RD ST

.0

03/01/06

12/31/06

300 07 0018 / 5441

ON S OAKLEY AVE FROM W 74TH ST TO W 75TH ST

3.0

04/18/06

11/18/06

300 06 0058 / 5229

ON S PULASKI RD FROM W 55TH ST TO W 83RD ST

190.0

300 04 0216 / 5114

ON S PULASKI RD FROM W 83RD ST TO W 85TH ST

35.0

05/01/06

11/01/06

300 07 0018 / 5441

ON S TRIPP AVE FROM W 85TH ST TO W 86TH ST

3.0

04/18/06

11/18/06

300 03 0018 / 4889

ON S WESTERN AVE FROM W 77TH ST TO W 79TH ST

40.0

05/01/05

05/30/05

9,888

300 03 0018 / 4889

ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE

16.0

05/01/05

05/30/05

3,317

300 03 0018 / 4889

ON W 82ND PL FROM S DAMEN AVE TO S HOYNE AVE

9.0

10/01/04

10/15/04

1,800 10/01/04

10/20/04

1,298

100

300 07 0018 / 5441

ON W 83RD PL FROM W COLUMBUS AVE TO S ST LOUIS AVE

5.0

04/18/06

11/18/06

1,250 09/29/06

10/05/06

0

100

300 03 0018 / 4889

ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE

65.0

10/01/04

10/15/04

21,800 10/11/04

10/20/04

1,730

100

300 07 0018 / 5441

ON W 84TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE

5.0

04/18/06

11/18/06

1,000 09/29/06

10/05/06

848

100

300 07 0018 / 5441

ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE

5.0

04/18/06

11/18/06

1,000 09/29/06

10/05/06

848

100

300 05 0018 / 5133

ON W 86TH PL FROM S FRANCISCO AVE TO S SACRAMENTO AVE

5.0

04/04/05

11/18/05

1,000 07/25/05

08/15/05

721

100

300 05 0018 / 5133

ON W 86TH ST FROM S FRANCISCO AVE TO S SACRAMENTO AVE

5.0

04/04/05

11/18/05

1,000 07/25/05

08/15/05

721

100

300 07 0018 / 5441

ON W 86TH ST FROM S TRIPP AVE TO S KILDARE AVE

1.0

04/18/06

11/18/06

250 09/29/06

10/05/06

0

100

300 05 0018 / 5133

ON W 87TH ST FROM S ROCKWELL ST TO S KEDZIE AVE

45.0

04/04/05

11/18/05

11,250 07/25/05

08/15/05

9,878

100

300 07 0018 / 5441

ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST

53.0

04/18/06

11/18/06

13,250 10/05/06

10/16/06

10,479

100

300 07 0018 / 5441

W 80TH ST AND S WESTERN AVE

8.0

04/18/06

11/18/06

1,600 09/29/06

10/05/06

1,356

100

300 07 0018 / 5441

W 82ND PL AND S DAMEN AVE

9.0

04/18/06

11/18/06

1,800 09/29/06

10/05/06

1,526

100

302 00 0077 / 5765

8501-8537 S KOLIN AVE

3.0

0 06/15/99

06/15/99

262

100

300 03 0018 / 4889

2750 W COLUMBUS AVE

8.0

2,000 10/01/04

10/20/04

19,251

100

Totals per Strt Light Pole Painting

565.0

10/01/04

10/15/04

0

0

0

0

600 09/29/06

10/05/06

0

100

52,780 08/12/02

09/25/02

52,780

100

7,498 05/17/06

06/18/06

7,498

100

600 09/29/06

10/05/06

508

100

143,926

0 0

111,579

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 201

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting

Blocks

300 06 0274 / 5382

ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST

2.0

06/24/05

03/24/06

150,000 06/24/05

03/24/06

80,000

100

300 06 0247 / 5357

ON S FRANCISCO AVE FROM W 83RD ST TO W 85TH ST

2.0

07/01/05

12/31/05

175,000 07/20/05

01/06/06

133,991

100

300 06 0274 / 5382

ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST

.50

06/24/05

03/24/06

40,000 06/24/05

03/24/06

80,000

100

300 06 0274 / 5382

ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST

1.0

06/24/05

12/27/05

75,000 06/24/05

12/27/05

80,000

100

300 06 0247 / 5357

ON S WHIPPLE ST FROM W 83RD ST TO W 85TH ST

2.0

06/01/04

09/01/04

210,000 10/08/04

05/12/05

128,775

100

300 06 0247 / 5357

ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE

2.0

10/01/03

12/01/03

3,100 05/22/03

05/30/03

3,040

100

300 06 0274 / 5382

ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE

1.50

06/24/05

03/24/06

150,000 06/24/05

03/24/06

80,000

100

300 06 0274 / 5382

ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE

.50

06/24/05

08/05/05

40,000 06/24/05

08/05/05

80,000

100

300 06 0274 / 5382

ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST

.50

06/24/05

08/05/05

40,000 06/24/05

08/05/05

80,000

100

300 06 0274 / 5382

ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE

2.50

06/24/05

12/20/05

180,000 06/24/05

12/20/05

80,000

100

14.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

8146 S KEDZIE AVE

Work Type: Underpass Lighting

1,063,100

825,806

Lamps 1,130.0

03/01/04

12/01/04

5,876 07/31/06

08/29/06

12,305

100

Fixtures

805 06 2468 / 8654

2400 E 87TH ST

19.0

02/12/96

02/12/96

0 02/12/96

02/12/96

14,250

100

805 06 2469 / 8655

2400 E 87TH ST

19.0

02/12/96

02/12/96

0 02/12/96

02/12/96

14,250

100

302 00 0070 / 5758

7500 S DAMEN AVE

0 12/15/97

12/23/97

8,366

100

805 06 2138 / 8324

7500 S DAMEN AVE

22.0

12/23/97

12/23/97

0 12/23/97

12/23/97

16,500

100

805 06 2426 / 8612

7901 S KEDZIE AVE

22.0

09/29/95

09/29/95

0 09/29/95

09/29/95

16,500

100

300 06 0217 / 5337

8146 S KEDZIE AVE

44.0

03/02/04

03/04/04

2,473 12/02/03

12/02/03

3,230

100

302 00 0070 / 5758

7500 S WESTERN AVE

0 06/12/97

06/19/97

20,106

100

805 06 2189 / 8375

7500 S WESTERN AVE

34.0

06/19/97

06/19/97

0 06/19/97

06/19/97

25,500

100

805 06 2098 / 8284

8205 S WESTERN AVE

10.0

02/07/94

02/07/94

0 02/07/94

02/07/94

7,500

100

805 06 2385 / 8571

2299 W 79TH ST

16.0

03/12/93

03/12/93

0 03/12/93

03/12/93

12,000

100

302 00 0072 / 5760

3150 W 79TH ST

1.0

0 02/08/00

02/18/00

15,500

100

805 06 2961 / 9147

2135 W 83RD ST

12.0

10/20/93

10/20/93

0 10/20/93

10/20/93

9,000

100

805 06 2957 / 9143

2547 W 83RD ST

8.0

11/01/93

11/01/93

0 11/01/93

11/01/93

6,000

100

Totals per Underpass Lighting

207.0

2,473

168,702

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 202

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

ON S WESTERN AVE FROM W 74TH ST TO W COLUMBUS AVE

2.0

05/26/05

05/27/05

10,563 03/16/05

03/16/05

9,422

100

210 06 0219 / 4459

S ASHLAND AVE AND W 83RD ST

.50

05/04/05

05/04/05

5,327 05/06/05

05/06/05

0

100

210 06 0219 / 4459

S WESTERN AVE AND W 71ST ST

.50

05/25/05

05/26/05

5,282 04/07/05

04/07/05

5,403

100

210 06 0219 / 4459

S WESTERN AVE AND W 77TH ST

1.0

05/27/05

05/28/05

10,563 04/06/05

04/06/05

8,008

100

210 06 0130 / 4389

S WESTERN AVE AND W 79TH ST

1.0

0 07/31/02

07/31/02

1,850

100

210 06 0219 / 4459

S WESTERN AVE AND W 79TH ST

1.0

05/30/05

05/31/05

10,563 04/05/05

04/05/05

10,489

100

210 06 0219 / 4459

S WESTERN AVE AND W 83RD ST

1.0

06/01/05

06/02/05

10,563 04/04/05

04/04/05

8,008

100

210 06 0219 / 4459

S WESTERN AVE AND W 87TH ST

.50

06/02/05

06/03/05

5,282 04/01/05

04/01/05

6,543

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

7.50

58,142

49,723

Locations

300 11 / 32207

W 83RD ST AND S WESTERN AVE

1.0

06/05/08

06/23/08

34,000 06/05/08

06/23/08

30,216

100

210 06 0070 / 4334

10720139 * Note Last Updated on 05-FEB-08 7900 S TALMAN AVE

1.0

06/01/99

12/01/99

30,000 04/27/99

07/22/99

30,279

100

Totals per Left Turn Arrow

Work Type: Signals 300 06 0096 / 5258

8146 S KEDZIE AVE

Work Type: TSM Install

2.0

64,000

60,495

Intersections 29.0

08/08/03

08/12/03

0 08/01/03

08/11/03

4,585

100

Locations

210 06 0108 / 4368

7700 S KEDZIE AVE

1.0

08/15/00

11/01/00

179,833 08/11/00

10/04/00

121,967

100

814 06 0097 / 16313

7700 S WESTERN AVE

1.0

11/19/92

11/19/92

0 11/19/92

11/19/92

77,020

100

2.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

179,833

198,987

Locations

300 07 0017 / 5440

ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON S MOZART ST FROM W 82ND ST TO W 83RD ST

.0

03/01/06

12/31/06

0

0

0

300 07 0017 / 5440

ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE

2.0

04/18/06

11/18/06

5,800

0

0

300 11 / 32206

ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE

2.0

05/01/07

05/15/07

5,800 05/01/07

05/15/07

5,800

100

300 07 0018 / 5441

ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST

15.0

04/18/06

11/18/06

6,000 10/05/06

10/16/06

2,976

100

Totals per Traffic Equipment Painting

19.0

17,600

8,776

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 203

1/1/2008 AND 12/31/2008

Ward 18 Lona Lane CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Traffic Totals per Traffic

319,575

322,566

Totals per Construction Phase

2,881,658

2,605,052

Totals for Ward 18

2,886,608

2,634,291

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 204

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,957

100

210 06 0240 / 4477

W 103RD ST AND S MAPLEWOOD AVE

.0

10/10/05

07/31/06

1,500 10/10/05

08/08/06

134

100

210 10 0025 / 4565

W 105TH ST AND S VINCENNES AVE

.0

03/01/03

12/31/04

0 03/01/03

12/31/04

1,999

100

210 10 0025 / 4565

W 107TH ST AND S VINCENNES AVE

.0

03/01/03

12/31/04

0 03/01/03

12/31/04

1,999

100

281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

.0

01/01/08

12/31/08

0

300 06 0292 / 5399

10228 S WESTERN AVE

1.0

03/08/05

05/09/05

Totals per Design/Engineering

Work Type: Feasibility Study 302 00 0079 / 5767

ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST

Totals per Lighting/Electrical

1.0

1,000 03/08/05

05/09/05

2,500

0

0

0

100

7,088

Projects .0

10/25/01

10/25/01

0 10/25/01 2,500

10/25/01

0 7,088

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 205

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 09 / 33085

ON S VANDERPOEL AVE FROM W 93RD ST TO W 95TH ST

12.0

11/13/08

11/14/08

4,800 11/13/08

11/14/08

3,098

100

302 00 0092 / 5774

9100-9199 S BEVERLY AVE

5.0

11/01/01

11/01/01

1,029 09/29/01

09/29/01

1,029

100

300 06 0069 / 5233

11301 S CHURCH ST

1.0

09/08/02

09/08/02

210 09/05/02

09/05/02

203

100

302 00 0092 / 5774

1500 W 104TH ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

1511 W 104TH ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

1529 W 104TH ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

1537 W 104TH ST

1.0

0 11/12/01

11/12/01

206

100

302 00 0092 / 5774

1559 W 104TH ST

1.0

0 11/12/01

11/12/01

206

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

23.0

6,039

5,360

Fixtures

300 06 0122 / 5275

ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE

34.0

05/10/03

05/13/03

11,600 05/07/03

05/09/03

6,045

100

300 05 0019 / 5134

ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE

40.0

04/04/05

11/18/05

16,000 08/15/05

09/01/05

12,806

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

74.0

27,600

18,851

1,236,035

1,356,982

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 206

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1638 / 7824

10916 S ALBANY AVE

1.0

08/21/97

08/21/97

0 08/21/97

08/21/97

300

100

805 06 1642 / 7828

11118 S ARTESIAN AVE

1.0

08/28/97

08/28/97

0 08/28/97

08/28/97

300

100

805 06 0843 / 7029

8956 S BELL AVE

1.0

10/28/96

10/28/96

0 10/28/96

10/28/96

300

100

805 06 0875 / 7061

9415 S BELL AVE

1.0

08/02/95

08/02/95

0 08/02/95

08/02/95

300

100

805 06 0876 / 7062

9425 S BELL AVE

1.0

10/17/95

10/17/95

0 10/17/95

10/17/95

300

100

805 06 1757 / 7943

9946 S BELL AVE

1.0

05/07/97

05/07/97

0 05/07/97

05/07/97

300

100

805 06 0855 / 7041

10222 S BELL AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 0812 / 6998

10810 S CENTRAL PARK AVE

1.0

04/19/96

04/19/96

0 04/19/96

04/19/96

300

100

805 06 1995 / 8181

9807 S CHARLES ST

1.0

03/26/96

03/26/96

0 03/26/96

03/26/96

300

100

805 06 0533 / 6719

10430 S CHURCH ST

1.0

06/20/96

06/20/96

0 06/20/96

06/20/96

300

100

805 06 0434 / 6620

10442 S CHURCH ST

1.0

06/20/96

06/20/96

0 06/20/96

06/20/96

300

100

805 06 0579 / 6765

10615 S FAIRFIELD AVE

1.0

07/22/96

07/22/96

0 07/22/96

07/22/96

300

100

805 06 0560 / 6746

10629 S FAIRFIELD AVE

1.0

07/10/96

07/10/96

0 07/10/96

07/10/96

300

100

805 06 0541 / 6727

10828 S FAIRFIELD AVE

1.0

07/31/96

07/31/96

0 07/31/96

07/31/96

300

100

805 06 1126 / 7312

10717 S HALE AVE

1.0

06/12/95

06/12/95

0 06/12/95

06/12/95

300

100

805 06 1555 / 7741

9418 S HAMILTON AVE

1.0

10/16/97

10/16/97

0 10/16/97

10/16/97

300

100

805 06 1071 / 7257

10418 S HAMILTON AVE

1.0

05/26/95

05/26/95

0 05/26/95

05/26/95

300

100

805 06 1073 / 7259

11310 S HAMLIN AVE

1.0

05/31/95

05/31/95

0 05/31/95

05/31/95

300

100

805 06 1057 / 7243

11402 S HAMLIN AVE

1.0

10/04/95

10/04/95

0 10/04/95

10/04/95

300

100

805 06 1075 / 7261

11408 S HAMLIN AVE

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

302 00 0092 / 5774

10957 S HERMOSA AVE

1.0

0 07/17/01

07/17/01

236

100

805 06 1094 / 7280

10820 S HOMAN AVE

1.0

10/11/96

10/11/96

0 10/11/96

10/11/96

300

100

805 06 1661 / 7847

11151 S HOMAN AVE

1.0

08/05/97

08/05/97

0 08/05/97

08/05/97

300

100

805 06 1212 / 7398

9319 S HOYNE AVE

1.0

07/18/96

07/18/96

0 07/18/96

07/18/96

300

100

805 06 1872 / 8058

10206 S LONGWOOD DR

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0585 / 6771

10022 S PROSPECT AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0556 / 6742

10035 S PROSPECT AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0570 / 6756

10108 S PROSPECT AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0558 / 6744

10159 S PROSPECT AVE

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0580 / 6766

10209 S PROSPECT AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0561 / 6747

10433 S PROSPECT AVE

1.0

06/20/96

06/20/96

0 06/20/96

06/20/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 207

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0562 / 6748

10502 S PROSPECT AVE

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0563 / 6749

10631 S PULASKI RD

1.0

03/20/96

03/20/96

0 03/20/96

03/20/96

300

100

805 06 0622 / 6808

9515 S SEELEY AVE

1.0

06/10/96

06/10/96

0 06/10/96

06/10/96

300

100

805 06 1471 / 7657

11454 S ST LOUIS AVE

1.0

11/17/97

11/17/97

0 11/17/97

11/17/97

300

100

805 06 0424 / 6610

10642 S TALMAN AVE

1.0

08/05/96

08/05/96

0 08/05/96

08/05/96

300

100

805 06 1551 / 7737

10741 S TALMAN AVE

1.0

10/14/97

10/14/97

0 10/14/97

10/14/97

300

100

805 06 1711 / 7897

10949 S TALMAN AVE

1.0

06/18/97

06/18/97

0 06/18/97

06/18/97

300

100

805 06 0441 / 6627

11343 S TALMAN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0361 / 6547

11025 S TROY ST

1.0

08/30/96

08/30/96

0 08/30/96

08/30/96

300

100

805 06 0362 / 6548

11251 S TROY ST

1.0

02/10/95

02/10/95

0 02/10/95

02/10/95

300

100

805 06 0501 / 6687

10825 S WASHTENAW AVE

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 0502 / 6688

10859 S WASHTENAW AVE

1.0

03/15/95

03/15/95

0 03/15/95

03/15/95

300

100

805 06 1202 / 7388

10030 S WESTERN AVE

1.0

12/17/97

12/17/97

0 12/17/97

12/17/97

300

100

805 06 1734 / 7920

10117 S WESTERN AVE

1.0

06/09/97

06/09/97

0 06/09/97

06/09/97

300

100

805 06 0517 / 6703

10150 S WESTERN AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0518 / 6704

10216 S WESTERN AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 0519 / 6705

10220 S WESTERN AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

300 06 0139 / 5289

10444 S WESTERN AVE

1,948.0

03/01/06

09/01/06

44,852 07/01/06

07/18/06

58,857

100

302 00 0092 / 5774

10444 S WESTERN AVE

46.0

0 02/06/01

01/24/02

10,840

100

805 06 1478 / 7664

10550 S WESTERN AVE

1.0

11/21/97

11/21/97

0 11/21/97

11/21/97

300

100

805 06 1763 / 7949

10734 S WHIPPLE ST

1.0

05/12/97

05/12/97

0 05/12/97

05/12/97

300

100

805 06 0459 / 6645

10935 S WOOD ST

1.0

11/02/95

11/02/95

0 11/02/95

11/02/95

300

100

805 06 1587 / 7773

1935 W 102ND ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1156 / 7342

2617 W 103RD PL

1.0

11/05/96

11/05/96

0 11/05/96

11/05/96

300

100

805 06 0958 / 7144

1901 W 103RD ST

1.0

04/03/96

04/03/96

0 04/03/96

04/03/96

300

100

805 06 0959 / 7145

1913 W 103RD ST

1.0

04/03/96

04/03/96

0 04/03/96

04/03/96

300

100

805 06 1645 / 7831

3951 W 104TH ST

1.0

09/03/97

09/03/97

0 09/03/97

09/03/97

300

100

805 06 0960 / 7146

1431 W 105TH ST

1.0

06/09/95

06/09/95

0 06/09/95

06/09/95

300

100

805 06 0931 / 7117

1527 W 107TH ST

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

805 06 0918 / 7104

3819 W 110TH PL

1.0

03/14/96

03/14/96

0 03/14/96

03/14/96

300

100

805 06 0934 / 7120

3838 W 110TH PL

1.0

03/14/96

03/14/96

0 03/14/96

03/14/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 208

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0936 / 7122

3849 W 110TH PL

1.0

03/14/96

03/14/96

0 03/14/96

03/14/96

300

100

805 06 1606 / 7792

3234 W 110TH ST

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

805 06 0938 / 7124

2545 W 111TH ST

1.0

07/10/96

07/10/96

0 07/10/96

07/10/96

300

100

805 06 0939 / 7125

3103 W 111TH ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 0941 / 7127

2160 W 112TH ST

1.0

07/07/95

07/07/95

0 07/07/95

07/07/95

300

100

805 06 1774 / 7960

2504 W 115TH ST

1.0

04/15/97

04/15/97

0 04/15/97

04/15/97

300

100

805 06 0916 / 7102

2534 W 117TH ST

1.0

11/11/96

11/11/96

0 11/11/96

11/11/96

300

100

805 06 1516 / 7702

1908 W MONTEREY AVE

1.0

10/30/97

10/30/97

0 10/30/97

10/30/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

10444 S WESTERN AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

10444 S WESTERN AVE

Work Type: Flood Light Install

2,062.0

44,852

90,033

Lamps 1,715.0

06/01/07

12/31/07

50,489 12/28/07

01/04/08

48,963

100

0 08/27/02

09/13/02

29,497

100

Installations 1,620.0

Fixtures

300 06 0167 / 5306

S ESMOND ST AND W MONTEREY AVE

1.0

0 11/13/99

11/13/99

351

100

302 00 0092 / 5774

10534 S MAPLEWOOD AVE

1.0

0 09/07/01

09/07/01

404

100

302 00 0092 / 5774

10536 S MAPLEWOOD AVE

1.0

0 09/07/01

09/07/01

404

100

302 00 0092 / 5774

10550 S MAPLEWOOD AVE

1.0

0 09/07/01

09/07/01

404

100

302 00 0092 / 5774

10304 S WOOD ST

1.0

0 07/23/01

07/23/01

471

100

302 00 0092 / 5774

10312 S WOOD ST

1.0

0 07/23/01

07/23/01

471

100

300 06 0167 / 5306

3820 W 103RD ST

1.0

0 01/06/99

01/06/99

351

100

300 06 0167 / 5306

4210 W 115TH ST

7.0

0 02/06/99

02/06/99

2,457

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

14.0

0

5,313

0

0

Blocks .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 209

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts

Installations

281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

.0

01/01/08

12/31/08

300 06 0292 / 5399

10228 S WESTERN AVE

.0

03/01/05

12/31/05

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts 300 06 0199 / 5324

W 111TH ST AND S LAWNDALE AVE

Work Type: Ornamental Lighting 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

300 06 0109 / 5264

2200-2299 W 95TH ST

Totals per Ornamental Lighting

Work Type: POD Camera Pole 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

300 11 / 32208

1900-1950 W 91ST ST

Totals per POD Camera Pole

Work Type: Residential Regrouping 300 06 0270 / 5378

10444 S WESTERN AVE

Work Type: Residntl Staggered Lighting

06/22/05

7,262

0

0

6,276

100

6,276

Projects

ON W 91ST ST FROM S WESTERN AVE TO S CLAREMONT AVE

Work Type: Loop Lighting 281 00 / 33670

.0

0 7,262 06/17/05

14,900 08/20/01

08/24/01

2,223

100

0

0

Blocks .0

01/01/08

12/31/08

.0

01/01/08

12/31/08

1.0

11/01/98

12/01/98

0

Blocks

1.0

0 80,000 11/10/98

12/01/98

80,000

0

0

76,427

100

76,427

Poles .0

01/01/08

12/31/08

1.0

06/01/07

06/10/07

1.0

0 1,200 06/06/07

06/06/07

0

0

1,200

100

1,200

1,200

0

0

0

Lamps .0

03/01/08

12/01/08

Blocks

300 06 0298 / 5405

ON S CENTRAL PARK AVE FROM W 107TH ST TO W 109TH ST

2.0

04/07/05

05/07/05

0 04/07/05

06/02/05

118,215

100

300 06 0308 / 5414

ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST

2.0

05/10/06

07/28/06

156,357 05/10/06

07/28/06

137,136

100

Project has been completed as of 7/28/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting

4.0

156,357

255,351

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 210

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 06 0235 / 5349

ON S CENTRAL PARK AVE FROM W 103RD ST TO W 105TH ST

2.0

06/12/03

08/12/03

146,206 06/03/03

08/04/03

131,586

100

300 06 0267 / 5375

ON S CENTRAL PARK AVE FROM W 105TH ST TO W 107TH ST

2.0

03/22/04

05/22/04

144,219 03/26/04

05/04/04

142,139

100

300 06 0078 / 5241

8900-9000 S BEVERLY AVE

1.0

02/28/01

05/01/01

38,730 11/24/00

01/22/01

37,953

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

Work Type: Short Arm Installs - Residntl 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

Work Type: Strt Light Pole Painting

5.0

329,155

311,678

Locations .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

Locations .0

Locations

302 00 0079 / 5767

ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST

18.0

10/01/01

10/06/01

2,300 10/01/01

10/12/01

2,300

100

300 06 0108 / 5263

ON S PULASKI RD FROM W 99TH ST TO W 103RD ST

28.0

05/10/03

05/16/03

7,450 05/18/03

05/21/03

6,020

100

302 00 0077 / 5765

ON S WESTERN AVE FROM W 111TH ST TO W 119TH ST

96.0

0 04/18/99

04/30/99

8,388

100

300 06 0108 / 5263

ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE

29.0

04/28/03

05/02/03

13,900 05/05/03

05/16/03

10,710

100

300 05 0019 / 5134

ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE

60.0

04/04/05

11/18/05

15,000 08/15/05

09/01/05

12,329

100

302 00 0076 / 5764

ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE

114.68

04/14/98

04/21/98

0 04/14/98

04/21/98

1,950

100

300 04 0216 / 5114

ON W 95TH ST FROM S WESTERN AVE TO S HOYNE AVE

33.0

05/01/06

11/01/06

7,065 05/17/06

07/12/06

7,065

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

W 111TH ST AND S LAWNDALE AVE

Work Type: Strt Lighting

378.68

45,715

48,762

0

0

0

Blocks .0

01/01/08

12/31/08

Blocks

300 06 0262 / 5370

ON S CALIFORNIA AVE FROM W 99TH ST TO W 103RD ST

5.0

11/01/02

03/15/03

180,000 10/22/02

02/28/03

163,979

100

300 06 0247 / 5357

ON W 112TH PL FROM S CENTRAL PARK AVE TO S ST LOUIS AVE

2.0

08/15/03

10/15/03

129,000 06/19/03

08/18/03

128,205

100

300 06 0247 / 5357

ON W 96TH ST FROM S LEAVITT ST TO S WESTERN AVE

2.0

11/01/04

12/15/04

155,000 11/01/04

12/23/04

147,135

100

9.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

10444 S WESTERN AVE

464,000

439,319

Lamps 1,628.0

03/01/04

12/01/04

8,466 07/31/06

08/14/06

17,729

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 211

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S WESTERN AVE AND W 101ST ST

1.0

0 04/03/02

04/03/02

1,850

100

210 06 0130 / 4389

S WESTERN AVE AND W 103RD ST

1.0

0 10/22/02

10/22/02

11,608

100

210 06 0219 / 4459

S WESTERN AVE AND W 107TH ST

1.0

06/03/05

06/04/05

10,563 03/31/05

03/31/05

8,368

100

210 06 0219 / 4459

S WESTERN AVE AND W 109TH ST

1.0

06/04/05

06/05/05

10,563 03/31/05

03/31/05

8,368

100

210 06 0130 / 4389

S WESTERN AVE AND W 111TH ST

1.0

0 04/03/02

04/03/02

1,850

100

210 06 0219 / 4459

S WESTERN AVE AND W 111TH ST

1.0

06/07/05

06/08/05

10,563 05/01/05

05/01/05

10,084

100

210 06 0219 / 4459

S WESTERN AVE AND W 113TH PL

1.0

04/30/05

04/30/05

10,563 04/24/05

04/24/05

6,468

100

210 06 0219 / 4459

S WESTERN AVE AND W 115TH ST

1.0

06/09/05

06/10/05

10,563 04/29/05

04/29/05

8,008

100

210 06 0219 / 4459

S WESTERN AVE AND W 87TH ST

.50

06/02/05

06/03/05

5,282 04/01/05

04/01/05

6,543

100

Totals per LED Signal Head Install

Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477

W 103RD ST AND S MAPLEWOOD AVE

8.50

58,097

63,147

Locations 8.0

11/01/05

07/19/07

15,000 11/01/05

10/25/06

5,293

100

08/04/03

08/12/03

0 08/01/03

08/10/03

5,376

100

Constructed BY operations Note Last Updated on 30-MAY-07

Work Type: Signals 300 06 0096 / 5258

10444 S WESTERN AVE

Work Type: TSM Install

Intersections 34.0

Locations

814 06 0139 / 16353

11099 S HOMAN AVE

1.0

04/27/93

04/27/93

0 04/27/93

04/27/93

93,077

100

210 06 0105 / 4365

11100 S KEDZIE AVE

1.0

08/15/00

11/01/00

75,000 08/08/00

10/04/00

45,517

100

814 06 0352 / 16550

10299 S LONGWOOD DR

1.0

07/02/96

07/02/96

0 07/02/96

07/02/96

100,000

100

210 06 0008 / 4283

10300 S ST LOUIS AVE

1.0

08/01/98

12/01/98

150,000 07/29/98

07/15/99

113,551

100

814 06 0344 / 16542

11338 S WESTERN AVE

1.0

05/15/96

05/15/96

0 05/15/96

05/15/96

113,510

100

210 06 0058 / 4325

3700 W 111TH ST

1.0

06/01/99

12/31/99

153,000 06/01/99

09/15/99

88,318

100

6.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 05 0019 / 5134

ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE

Totals per Traffic Totals per Construction Phase

378,000

553,973

Locations 17.0

04/04/05

11/18/05

5,300 08/15/05

09/01/05

8,796

456,397

636,585

1,692,432

1,993,566

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 212

1/1/2008 AND 12/31/2008

Ward 19 Virginia A. Rugai CIP/CPM Number Totals for Ward 19

Street Address

No of Units

Start

WIP Estimate End

Cost 1,694,932

Start

WIP Actual (to Date) End

Cost 2,000,654

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 213

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0292 / 5399

5517 S MICHIGAN AVE

Projects 1.0

1,000 08/03/05

08/03/05

384

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 214

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON E 64TH ST FROM S WOODLAWN AVE TO S KIMBARK AVE

4.0

1,500 05/08/02

05/08/02

1,500

100

302 00 0092 / 5774

ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST

9.0

0 09/27/01

09/27/01

1,852

100

300 06 0069 / 5233

ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST

4.0

05/24/02

05/24/02

840 05/21/02

05/21/02

904

100

302 00 0092 / 5774

ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST

4.0

04/15/02

04/15/02

840

300 06 0069 / 5233

6327-6401 S INGLESIDE AVE

4.0

1,500 04/16/02

04/16/02

1,500

100

300 06 0069 / 5233

6300 S RHODES AVE

9.0

10/21/02

10/21/02

3,600 10/18/02

10/18/02

4,235

100

300 06 0122 / 5275

5859 S STATE ST

1,950.0

08/01/03

09/09/03

765,250 08/01/03

10/14/03

441,011

100

300 06 0069 / 5233

6217-6251 S UNIVERSITY AVE

1,125 05/08/02

05/08/02

1,125

100

Totals per 250 Watt Changeout

Work Type: Alley Lighting/Lamps 300 06 0204 / 5327

ON S COTTAGE GROVE AVE FROM E 62ND ST TO E 63RD ST

300 06 0204 / 5327

ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST

300 06 0204 / 5327

3.0 1,987.0

0

774,655

452,127

Installations 3.0

08/13/01

08/13/01

960 09/29/01

09/29/01

960

100

10.0

08/14/01

08/14/01

3,200 09/29/01

09/29/01

2,060

100

800 E 63RD ST

2.0

08/09/01

08/09/01

640 09/29/01

09/29/01

640

100

805 06 0963 / 7149

367 E 68TH ST

1.0

03/27/96

03/27/96

0 03/27/96

03/27/96

300

100

805 06 1469 / 7655

360 E 69TH ST

2.0

12/04/97

12/04/97

0 12/04/97

12/04/97

600

100

805 06 1475 / 7661

370 E 69TH ST

1.0

11/19/97

11/19/97

0 11/19/97

11/19/97

300

100

805 06 1526 / 7712

6200 S DR MARTIN LUTHER KING JR DR

1.0

11/06/97

11/06/97

0 11/06/97

11/06/97

300

100

805 06 1887 / 8073

6812 S DR MARTIN LUTHER KING JR DR

1.0

10/21/96

10/21/96

0 10/21/96

10/21/96

300

100

805 06 2041 / 8227

6812 S DR MARTIN LUTHER KING JR DR

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

805 06 2054 / 8240

6838 S DR MARTIN LUTHER KING JR DR

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 2043 / 8229

6844 S DR MARTIN LUTHER KING JR DR

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 2064 / 8250

6846 S DR MARTIN LUTHER KING JR DR

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 0644 / 6830

6427 S EVANS AVE

1.0

06/07/95

06/07/95

0 06/07/95

06/07/95

300

100

302 00 0092 / 5774

6523 S HALSTED ST

1.0

0 12/31/01

12/31/01

236

100

805 06 1523 / 7709

5914 S LOWE AVE

1.0

0 11/04/97

11/04/97

300

100

302 00 0092 / 5774

4858 S MARSHFIELD AVE

1.0

0 10/23/01

10/23/01

236

100

805 06 0531 / 6717

6754 S PRAIRIE AVE

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

300 06 0139 / 5289

5859 S STATE ST

1,048.0

03/01/06

09/01/06

26,012 04/01/06

04/15/06

31,664

100

302 00 0092 / 5774

5859 S STATE ST

17.0

0 02/02/01

01/20/02

4,006

100

Totals per Alley Lighting/Lamps

1,095.0

11/04/97

11/04/97

30,812

43,702

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 215

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

5859 S STATE ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5859 S STATE ST

Work Type: Flood Light Install

Lamps 2,170.0

06/01/07

12/31/07

63,884 11/16/07

12/05/07

61,953

100

0 07/24/02

07/27/02

37,782

100

Installations 2,075.0

Fixtures

300 06 0198 / 5323

RANDOLPH TOWERS (CHA)

17,762 06/04/01

06/06/01

14,691

100

302 00 0092 / 5774

S DAMEN AVE AND W 48TH ST

.50

0 09/25/01

09/25/01

202

100

302 00 0092 / 5774

S WINCHESTER AVE AND W 48TH ST

1.0

0 09/25/01

09/25/01

404

100

300 06 0167 / 5306

6410 S DANTE AVE

6.0

0 10/27/99

10/27/99

2,105

100

300 06 0071 / 5234

5531 S DR MARTIN LUTHER KING JR DR

0

114

100

17,762

17,516

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0256 / 5366

ON W 59TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

6357 S COTTAGE GROVE AVE

Work Type: Residntl Staggered Lighting 300 06 0298 / 5405

ON S RHODES AVE FROM E 63RD ST TO E 65TH ST

Work Type: Residntl Strt Lighting/Lamps

02/24/01

11/20/00

06/07/01

11/23/00

7.50

Installations 13.0

02/15/04

08/01/04

21,100 08/09/04

03/01/08

12/01/08

0

07/01/05

09/01/05

0 06/17/05

05/16/05

23,110

100

0

0

09/23/05

135,213

100

Lamps .0

Blocks 2.0

Blocks

300 06 0267 / 5375

ON S RHODES AVE FROM E 61ST ST TO E 62ND ST

2.0

10/15/04

12/15/04

154,252 09/09/04

12/21/04

154,552

100

300 06 0235 / 5349

ON S WABASH AVE FROM E 55TH ST TO E 57TH ST

2.0

05/02/03

07/02/03

175,814 05/02/03

08/01/03

157,797

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial

4.0

330,066

312,349

Locations

302 00 0092 / 5774

4619 S HERMITAGE AVE

1.0

0 02/23/01

02/23/01

378

100

302 00 0092 / 5774

4645 S HERMITAGE AVE

1.0

0 02/23/01

02/23/01

378

100

2.0

0

756

1,523,070

1,899,429

Totals per Short Arm Installs - Arterial Totals per Lighting/Electrical

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 216

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0108 / 5263

ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE

70.0

05/11/03

05/31/03

17,000 07/01/03

07/28/03

16,870

100

300 06 0108 / 5263

ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST

79.0

05/20/03

06/03/03

18,500 07/01/03

07/28/03

18,480

100

300 06 0108 / 5263

ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST

90.0

05/28/03

06/15/03

21,500 07/01/03

07/28/03

22,120

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 300 06 0204 / 5327

ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

5859 S STATE ST

239.0

57,000

57,470

Blocks 9.0

10/13/01

10/13/01

1,890 09/27/01

09/27/01

1,890

100

03/01/04

12/01/04

9,334 07/31/06

09/07/06

19,548

100

Lamps 1,795.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 217

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 300 06 0122 / 5275

Fixtures 200.0

10/15/03

10/30/03

190,000 10/01/03

11/03/03

164,675

100

300 06 0204 / 5327

ON E 63RD ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE E 63RD ST AND S COTTAGE GROVE AVE

8.0

08/10/01

08/10/01

2,960 12/04/01

12/05/01

2,960

100

805 06 2823 / 9009

1405 E 63RD ST

26.0

05/04/93

05/04/93

0 05/04/93

05/04/93

19,500

100

805 06 2965 / 9151

1405 E 64TH ST

26.0

02/24/94

02/24/94

0 02/24/94

02/24/94

19,500

100

805 06 2898 / 9084

1405 E 65TH ST

26.0

10/19/93

10/19/93

0 10/19/93

10/19/93

19,500

100

805 06 2370 / 8556

107 E GARFIELD BLVD

14.0

03/24/93

03/24/93

0 03/24/93

03/24/93

10,500

100

805 06 2393 / 8579

107 E GARFIELD BLVD

14.0

03/24/93

03/24/93

0 03/24/93

03/24/93

10,500

100

805 06 2797 / 8983

390 E MARQUETTE RD

33.0

06/21/94

06/21/94

0 06/21/94

06/21/94

24,750

100

805 06 2798 / 8984

390 E MARQUETTE RD

14.0

06/30/94

06/30/94

0 06/30/94

06/30/94

10,500

100

805 06 2466 / 8652

1398 E MARQUETTE RD

30.0

11/02/93

11/02/93

0 11/02/93

11/02/93

22,500

100

805 06 2832 / 9018

4995 S ABERDEEN ST

12.0

06/01/94

06/01/94

0 06/01/94

06/01/94

9,000

100

805 06 2137 / 8323

4905 S ASHLAND AVE

8.0

01/31/94

01/31/94

0 01/31/94

01/31/94

6,000

100

805 06 2618 / 8804

6720 S DR MARTIN LUTHER KING JR DR

16.0

10/27/94

10/27/94

0 10/27/94

10/27/94

12,000

100

805 06 2413 / 8599

6731 S DR MARTIN LUTHER KING JR DR

17.0

11/27/95

11/27/95

0 11/27/95

11/27/95

12,750

100

805 06 2414 / 8600

6731 S DR MARTIN LUTHER KING JR DR

21.0

11/27/95

11/27/95

0 11/27/95

11/27/95

15,750

100

805 06 2795 / 8981

4901 S HERMITAGE AVE

2.0

03/23/94

03/23/94

0 03/23/94

03/23/94

1,500

100

805 06 2573 / 8759

4905 S LAFLIN ST

4.0

03/15/95

03/15/95

0 03/15/95

03/15/95

3,000

100

805 06 2249 / 8435

4901 S LOOMIS BLVD

8.0

11/09/93

11/09/93

0 11/09/93

11/09/93

6,000

100

805 06 2557 / 8743

6105 S PRINCETON AVE

8.0

04/20/95

04/20/95

0 04/20/95

04/20/95

6,000

100

805 06 2234 / 8420

4901 S RACINE AVE

8.0

01/11/94

01/11/94

0 01/11/94

01/11/94

6,000

100

300 06 0217 / 5337

5859 S STATE ST

420.0

03/17/04

03/22/04

23,607 01/22/04

01/27/04

16,799

100

805 06 2809 / 8995

6305 S STATE ST

52.0

06/07/93

06/07/93

0 06/07/93

06/07/93

39,000

100

302 00 0071 / 5759

6440 S STATE ST

0 12/27/98

01/07/99

36,078

100

805 06 2514 / 8700

6505 S STATE ST

8.0

04/29/93

04/29/93

0 04/29/93

04/29/93

6,000

100

805 06 2516 / 8702

6505 S STATE ST

8.0

04/19/93

04/19/93

0 04/19/93

04/19/93

6,000

100

805 06 2810 / 8996

4901 S THROOP ST

8.0

06/01/94

06/01/94

0 06/01/94

06/01/94

6,000

100

805 06 2183 / 8369

6299 S WENTWORTH AVE

12.0

04/08/93

04/08/93

0 04/08/93

04/08/93

9,000

100

805 06 2185 / 8371

6299 S WENTWORTH AVE

14.0

03/28/97

03/28/97

0 03/28/97

03/28/97

10,500

100

805 06 2239 / 8425

6501 S WENTWORTH AVE

24.0

04/08/93

04/08/93

0 04/08/93

04/08/93

18,000

100

805 06 2827 / 9013

6200 S YALE AVE

11.0

04/28/94

04/28/94

0 04/28/94

04/28/94

8,250

100

805 06 2679 / 8865

101 W 57TH PL

12.0

07/22/94

07/22/94

0 07/22/94

07/22/94

9,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 218

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

302 00 0072 / 5760

100 W 59TH ST

1.0

0 01/18/00

02/02/00

14,424

100

805 06 2749 / 8935

101 W 59TH ST

18.0

01/02/92

01/02/92

0 01/02/92

01/02/92

13,500

100

805 06 2680 / 8866

101 W 60TH ST

12.0

07/22/94

07/22/94

0 07/22/94

07/22/94

9,000

100

805 06 2845 / 9031

305 W 61ST PL

12.0

07/15/94

07/15/94

0 07/15/94

07/15/94

9,000

100

805 06 2682 / 8868

118 W 61ST ST

30.0

08/02/94

08/02/94

0 08/02/94

08/02/94

22,500

100

805 06 2825 / 9011

599 W 61ST ST

8.0

01/13/93

01/13/93

0 01/13/93

01/13/93

6,000

100

302 00 0071 / 5759

30 W 63RD ST

0 09/01/98

09/09/98

35,446

100

302 00 0071 / 5759

50 W 63RD ST

0 08/22/98

08/28/98

11,638

100

302 00 0071 / 5759

110 W 63RD ST

0 08/15/98

08/17/98

1,940

100

302 00 0071 / 5759

120 W 63RD ST

0 08/01/98

08/12/98

23,053

100

805 06 2808 / 8994

139 W 63RD ST

12.0

07/19/91

07/19/91

0 07/19/91

07/19/91

9,000

100

805 06 2831 / 9017

139 W 63RD ST

12.0

07/19/91

07/19/91

0 07/19/91

07/19/91

9,000

100

805 06 2834 / 9020

139 W 63RD ST

8.0

07/19/91

07/19/91

0 07/19/91

07/19/91

6,000

100

805 06 2269 / 8455

199 W 63RD ST

8.0

01/11/94

01/11/94

0 01/11/94

01/11/94

6,000

100

805 06 2286 / 8472

220 W 63RD ST

8.0

01/11/94

01/11/94

0 01/11/94

01/11/94

6,000

100

805 06 2848 / 9034

599 W ENGLEWOOD AVE

8.0

01/21/93

01/21/93

0 01/21/93

01/21/93

6,000

100

Totals per Underpass Lighting

1,201.0

216,567

736,013

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 219

1/1/2008 AND 12/31/2008

Ward 20 Willie Cochran CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S INDIANA AVE AND E 69TH ST

.50

0 05/21/02

05/21/02

3,662

100

210 06 0130 / 4389

S SOUTH CHICAGO AVE AND S KEEFE AVE

.50

0 04/30/02

04/30/02

925

100

1.0

0

Totals per LED Signal Head Install

Work Type: New Signal 210 06 0075 / 4339

Locations

E 57TH ST AND S MICHIGAN AVE

Work Type: Removal Temp Wiring - Signals

4,587

07/01/04

09/01/04

124,500 07/01/04

09/17/04

104,604

100

Crossings

300 06 0197 / 5322

S COTTAGE GROVE AVE AND E 63RD ST

3.0

03/20/01

04/20/01

12,000 03/14/01

04/07/01

7,563

100

300 06 0197 / 5322

S DR MARTIN LUTHER KING JR DR AND E 65TH ST

1.0

03/02/01

04/20/01

4,000 03/02/01

04/09/01

1,462

100

300 06 0197 / 5322

S ST LAWRENCE AVE AND E 63RD ST

3.0

03/20/01

04/20/01

12,000 03/08/01

03/21/01

9,066

100

300 06 0197 / 5322

S ST LAWRENCE AVE AND E 67TH ST

1.0

03/20/01

04/20/01

4,000 03/13/01

04/09/01

5,321

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

5859 S STATE ST

Totals per Traffic

8.0

32,000

23,412

Intersections 71.0

08/05/03

08/13/03

0 08/07/03

08/13/03

11,227

156,500

143,830

Totals per Construction Phase

1,679,570

2,043,259

Totals for Ward 20

1,680,570

2,043,643

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 220

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON S ADA ST FROM W 81ST ST TO W 83RD ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,231

100

300 06 / 32146

ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE

.0

05/01/07

10/31/07

1,950 06/21/07

07/19/07

1,000

100

300 06 0275 / 5383

ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD

.0

10/01/04

06/30/05

0 10/01/04

06/30/05

2,713

100

210 10 0025 / 4565

W 103RD ST AND S VINCENNES AVE

.0

03/01/03

06/25/02

0 03/01/03

06/25/02

1,332

100

210 10 0025 / 4565

W 105TH ST AND S VINCENNES AVE

.0

03/01/03

12/31/04

0 03/01/03

12/31/04

1,999

100

210 10 0025 / 4565

W 107TH ST AND S VINCENNES AVE

.0

03/01/03

12/31/04

0 03/01/03

12/31/04

1,999

100

210 06 0243 / 4480

W 95TH ST AND S LAFAYETTE AVE

.0

01/10/07

02/01/07

700 01/01/07

01/26/07

2,549

100

210 06 0243 / 4480

W 98TH PL AND S HALSTED ST

.0

300 06 / 32275

8900-9100 S CARPENTER ST

.0

03/01/07

10/31/07

300 06 / 32021

7600-7900 S THROOP ST

.0

09/12/06

300 06 0315 / 5421

201 W 95TH ST

.0

01/26/07

0

0

0

2,277

100

3,900 02/21/07

03/21/07

09/18/06

0 09/12/06

09/18/06

0

0

08/06/07

15,000 01/26/07

03/27/07

7,500

100

Project finished on 3/26/2007 Note Last Updated on 11-FEB-08 Electronic Files with proposed drives & work received on Jan 24th, 2007 Note Last Updated on 26-JAN-07 Totals per Design/Engineering

.0

21,550

23,599

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 221

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON S GREEN ST FROM W 80TH ST TO W 83RD ST

300 06 0069 / 5233

ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST

5,200 01/07/03

01/07/03

2,758

100

1,500 05/06/02

05/06/02

1,500

300 06 0069 / 5233

ON S PEORIA ST FROM W 80TH ST TO W 83RD ST

13.0

01/10/03

100

01/10/03

5,200 01/07/03

01/07/03

2,757

300 06 0069 / 5233

ON S SANGAMON ST FROM W 80TH ST TO W 83RD ST

13.0

100

01/10/03

01/10/03

5,200 01/07/03

01/07/03

2,758

300 06 0069 / 5233

ON S WALLACE ST FROM W 90TH ST TO W 92ND ST

100

7.0

01/04/03

01/04/03

2,800 12/31/02

12/31/02

1,073

300 06 0069 / 5233

100

8300 S ABERDEEN ST

5.0

05/11/02

05/11/02

1,050 05/08/02

05/08/02

1,015

100

300 06 0069 / 5233

8400 S ABERDEEN ST

4.0

03/03/02

03/03/02

840 02/28/02

02/28/02

812

100

300 09 / 33087

8000-8100 S EMERALD AVE

4.0

06/09/08

06/10/08

1,600 06/09/08

06/10/08

1,141

100

300 09 / 33087

MATERIALS ORDERED 07/01/08 Note Last Updated on 01-JUL-08 9408 S HARVARD AVE

1.0

11/05/08

11/05/08

400 11/05/08

11/05/08

265

100

302 00 0092 / 5774

8801 S HONORE ST

1.0

0 08/20/01

08/20/01

206

100

302 00 0092 / 5774

8815 S HONORE ST

1.0

0 08/20/01

08/20/01

206

100

300 06 0069 / 5233

8800 S LOOMIS ST

4.0

01/10/03

01/10/03

1,600 01/07/03

01/07/03

1,500

100

300 06 0069 / 5233

8800 S LOWE AVE

4.0

01/10/03

01/10/03

1,600 01/07/03

01/07/03

1,500

100

302 00 0092 / 5774

8900-8999 S LOWE AVE

5.0

10/16/01

10/16/01

1,029 09/29/01

09/29/01

1,029

100

302 00 0092 / 5774

8101 S MARSHFIELD AVE

1.0

0 01/18/02

01/18/02

203

100

302 00 0092 / 5774

8201 S MARSHFIELD AVE

1.0

0 01/18/02

01/18/02

203

100

300 06 0069 / 5233

8400 S PEORIA ST

4.0

01/10/03

01/10/03

1,600 01/07/03

01/07/03

1,500

100

300 09 / 33087

8817 S PRINCETON AVE

1.0

11/05/08

11/05/08

400 11/05/08

11/05/08

261

100

300 09 / 33087

8833 S PRINCETON AVE

1.0

11/05/08

11/05/08

400 11/05/08

11/05/08

261

100

300 09 / 33087

9334 S STEWART AVE

1.0

11/05/08

11/05/08

400 11/05/08

11/05/08

265

100

300 09 / 33087

8100-8300 S THROOP ST

10.0

02/01/08

12/31/08

4,000 10/30/08

10/30/08

4,000

100

302 00 0092 / 5774

9337 S THROOP ST

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

8700-8799 S WALLACE ST

15.0

11/10/01

11/12/01

4,116 10/03/01

10/03/01

3,090

100

300 06 0069 / 5233

9000 S WALLACE ST

5.0

07/05/02

07/05/02

1,050 07/02/02

07/02/02

1,073

100

300 06 0069 / 5233

1300 W 88TH ST

4.0

01/10/03

01/10/03

1,600 01/07/03

01/07/03

1,343

100

300 06 0069 / 5233

1400 W 88TH ST

4.0

01/10/03

01/10/03

1,600 01/07/03

01/07/03

1,343

100

300 09 / 33087

245 W 91ST ST

1.0

11/05/08

11/05/08

400 11/05/08

11/05/08

265

100

300 09 / 33087

226 W 94TH ST

2.0

11/05/08

11/05/08

800 11/05/08

11/05/08

530

100

Totals per 250 Watt Changeout

13.0

01/10/03

01/10/03

4.0

130.0

44,621

33,093

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 222

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0204 / 5327

W 91ST ST AND S ABERDEEN ST

2.0

08/08/01

08/08/01

1,600 09/29/01

09/29/01

640

100

805 06 0856 / 7042

9863 S BEVERLY AVE

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 1636 / 7822

10246 S ELIZABETH ST

1.0

06/07/96

06/07/96

0 06/07/96

06/07/96

300

100

805 06 1644 / 7830

8241 S GREEN ST

1.0

08/29/97

08/29/97

0 08/29/97

08/29/97

300

100

302 00 0092 / 5774

8256 S HALSTED ST

1.0

0 12/10/01

12/10/01

236

100

300 06 0139 / 5289

9612 S HALSTED ST

2,279.0

03/01/06

09/01/06

52,018 04/01/06

04/16/06

68,858

100

805 06 1541 / 7727

9537 S LA SALLE ST

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 1810 / 7996

9211 S MAY ST

1.0

10/23/96

10/23/96

0 10/23/96

10/23/96

300

100

805 06 0597 / 6783

9424 S PARNELL AVE

1.0

01/09/96

01/09/96

0 01/09/96

01/09/96

300

100

805 06 0546 / 6732

9119 S PAULINA ST

1.0

01/15/96

01/15/96

0 01/15/96

01/15/96

300

100

805 06 0428 / 6614

8440 S THROOP ST

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 0367 / 6553

8005 S UNION AVE

1.0

11/08/96

11/08/96

0 11/08/96

11/08/96

300

100

805 06 1796 / 7982

8019 S UNION AVE

1.0

04/09/97

04/09/97

0 04/09/97

04/09/97

300

100

302 00 0092 / 5774

1125 W 95TH ST

0 01/16/01

01/24/02

9,426

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

9612 S HALSTED ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1125 W 95TH ST

Work Type: Flood Light Install

40.0 2,332.0

53,618

82,160

Lamps 2,069.0

06/01/07

12/31/07

60,911 11/15/07

01/11/08

59,069

100

0 08/15/02

09/01/02

35,378

100

Installations 1,943.0

Fixtures

300 06 0198 / 5323

LOWDEN HOMES

06/16/01

06/27/01

50,891 06/06/01

06/18/01

50,891

100

300 06 0071 / 5234

8223 S PRINCETON AVE

07/13/98

09/15/98

11,600 07/13/98

09/15/98

4,918

100

62,491

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

55,809

Blocks

281 00 / 32154

7600-7900 S THROOP ST

.0

12/08/06

12/31/06

0 12/08/06

12/31/06

0

0

300 06 0315 / 5421

201 W 95TH ST

.0

04/02/07

04/30/08

255,600 04/19/07

05/08/07

226,958

100

Totals per Lighting Imprvmnts

.0

255,600

226,958

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 223

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0122 / 5275

9450 S NORMAL AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

9612 S HALSTED ST

Work Type: Residntl Staggered Lighting

Installations 1.0

05/12/03

05/14/03

03/01/08

12/01/08

3,900 05/01/03

05/02/03

2,601

100

0

0

Lamps .0

0

Blocks

300 06 0308 / 5414

ON S ADA ST FROM W 81ST ST TO W 83RD ST

2.0

04/24/06

07/21/06

145,193 04/24/06

07/21/06

143,850

100

300 06 0298 / 5405

ON S LAFLIN ST FROM W 79TH ST TO W 81ST ST

2.0

09/01/05

10/15/05

0 08/02/05

12/19/05

124,705

100

300 06 / 32146

ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE

2.0

12/05/07

04/29/08

158,512

300 06 / 32275

8900-9100 S CARPENTER ST

2.0

04/01/07

12/31/07

162,645 04/05/07

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

8.0

07/02/07

466,350

0

50

96,306

100

364,861

Blocks

300 06 0253 / 5363

SIMEON CPS

08/01/03

08/29/03

135,000 07/18/03

10/31/03

125,667

100

300 06 0232 / 5346

ON S HERMITAGE AVE FROM W 87TH ST TO W 88TH ST

2.0

11/20/02

02/14/03

146,400 12/02/02

02/07/03

130,267

100

300 06 0267 / 5375

ON S LOWE AVE FROM W 88TH ST TO W 90TH ST

2.0

10/15/04

12/15/04

181,968 10/18/04

12/14/04

127,930

100

300 06 0235 / 5349

ON S MAY ST FROM W 89TH ST TO W 91ST ST

2.0

03/19/03

05/14/03

166,598 03/19/03

05/16/03

149,337

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 06 / 32021

7600-7900 S THROOP ST

Work Type: Short Arm Installs - Residntl

6.0

629,966

533,201

Installations .0

09/18/06

09/29/06

0 09/18/06

09/29/06

0

0

Locations

302 00 0092 / 5774

8100 S GREEN ST

1.0

0 05/24/01

05/24/01

378

100

302 00 0092 / 5774

8715 S WALLACE ST

1.0

0 06/15/01

06/15/01

378

100

2.0

0

756

2,312,612

2,295,956

Totals per Short Arm Installs - Residntl Totals per Lighting/Electrical

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 224

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 04 0216 / 5114

ON S ASHLAND AVE FROM W 93RD ST TO W 95TH ST

31.0

05/01/06

11/01/06

6,705 05/17/06

09/01/06

6,705

100

300 04 0216 / 5114

ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST

14.0

05/01/06

11/01/06

3,028 05/17/06

07/01/06

3,028

100

302 00 0076 / 5764

ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE

7.32

04/14/98

04/21/98

0 04/14/98

04/21/98

124

100

300 06 0108 / 5263

8800 S ABERDEEN ST

4.0

11/25/03

11/25/03

800 11/15/03

11/16/03

560

100

302 00 0076 / 5764

8000-8100 S LAFLIN ST

18.0

05/17/98

05/18/98

0 05/17/98

05/18/98

306

100

300 06 0108 / 5263

9200 S LAFLIN ST

4.0

11/25/03

11/25/03

1,000 11/15/03

11/16/03

560

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

78.32

11,533

11,283

Blocks

300 06 0264 / 5372

CUFFE CPS

1.0

0 07/15/03

08/15/03

19,603

100

300 06 0246 / 5356

ON S GENOA AVE FROM W 95TH ST TO W 96TH ST

1.0

08/01/04

10/01/04

102,084 09/07/04

06/14/05

86,479

100

300 06 0246 / 5356

ON S RACINE AVE FROM W 97TH PL TO W 98TH ST

.50

08/01/04

11/01/04

102,083 09/07/04

06/20/05

86,479

100

300 06 0246 / 5356

ON S SANGAMON ST FROM W 95TH ST TO W 94TH ST

1.0

08/01/04

11/01/04

102,083 09/07/04

12/04/04

86,479

100

300 06 0275 / 5383

ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD

.75

85,000 08/29/05

01/10/06

54,822

100

300 06 0246 / 5356

ON W 92ND ST FROM S SANGAMON ST TO S PEORIA ST

.50

08/01/04

11/01/04

102,083 09/07/04

06/28/05

86,479

100

300 06 0246 / 5356

ON W 94TH ST FROM S SANGAMON ST TO S PEORIA ST

.50

08/01/04

11/01/04

102,083 09/07/04

12/04/04

86,479

100

300 06 0246 / 5356

ON W 96TH ST FROM S VINCENNES AVE TO S HALSTED ST

3.50

08/01/04

11/01/04

102,084 09/07/04

06/28/05

86,479

100

8.75

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

9612 S HALSTED ST

697,500

593,299

Lamps 1,705.0

03/01/04

12/01/04

8,866 07/31/06

08/16/06

18,567

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 225

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2258 / 8444

8501 S HALSTED ST

68.0

09/04/96

09/04/96

0 09/04/96

09/04/96

51,000

100

805 06 2945 / 9131

8699 S HOLLAND RD

20.0

12/28/93

12/28/93

0 12/28/93

12/28/93

15,000

100

805 06 2944 / 9130

8901 S MORGAN ST

4.0

12/21/93

12/21/93

0 12/21/93

12/21/93

3,000

100

805 06 2236 / 8422

9022 S STATE ST

16.0

05/09/96

05/09/96

0 05/09/96

05/09/96

12,000

100

805 06 2237 / 8423

9022 S STATE ST

8.0

05/09/96

05/09/96

0 05/09/96

05/09/96

6,000

100

805 06 2238 / 8424

9022 S STATE ST

11.0

05/09/96

05/09/96

0 05/09/96

05/09/96

8,250

100

805 06 2218 / 8404

8301 S VINCENNES AVE

78.0

12/18/96

12/18/96

0 12/18/96

12/18/96

58,500

100

302 00 0072 / 5760

8320 S VINCENNES AVE

1.0

0 05/01/00

05/03/00

8,748

100

805 06 2222 / 8408

8698 S VINCENNES AVE

34.0

12/09/96

12/09/96

0 12/09/96

12/09/96

25,500

100

805 06 2942 / 9128

8899 S VINCENNES AVE

18.0

03/20/94

03/20/94

0 03/20/94

03/20/94

13,500

100

805 06 2889 / 9075

625 W 80TH ST

18.0

03/04/94

03/04/94

0 03/04/94

03/04/94

13,500

100

805 06 2097 / 8283

695 W 81ST ST

16.0

02/17/93

02/17/93

0 02/17/93

02/17/93

12,000

100

805 06 2221 / 8407

285 W 87TH ST

24.0

04/27/93

04/27/93

0 04/27/93

04/27/93

18,000

100

805 06 2220 / 8406

335 W 87TH ST

20.0

04/22/93

04/22/93

0 04/22/93

04/22/93

15,000

100

805 06 2946 / 9132

335 W 88TH ST

8.0

12/21/93

12/21/93

0 12/21/93

12/21/93

6,000

100

300 06 0217 / 5337

1125 W 95TH ST

307.0

04/13/04

04/16/04

17,256 12/09/03

12/11/03

12,923

100

Totals per Underpass Lighting

651.0

17,256

278,921

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 226

1/1/2008 AND 12/31/2008

Ward 21 Howard B Brookins, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

S ASHLAND AVE AND W 83RD ST

.50

05/04/05

05/04/05

5,327 05/06/05

05/06/05

0

100

210 06 0219 / 4459

S ASHLAND AVE AND W 87TH ST

1.0

05/03/05

05/03/05

10,653 05/05/04

05/04/05

0

100

Totals per LED Signal Head Install

Work Type: New Signal 300 06 0283 / 5391

S HALSTED ST AND W 91ST ST

Work Type: Pedestrian Countdown Signal Install

1.50

15,980

0

Locations 1.0

09/02/04

09/30/04

9,293 09/09/04

09/09/04

9,293

100

Locations

210 06 0243 / 4480

W 95TH ST AND S LAFAYETTE AVE

03/27/06

12/27/08

12,000

0

0

210 06 0243 / 4480

Showing jcs funding for drafting dept. only. job not yet issued Note Last Updated on 29-JAN-08 W 98TH PL AND S HALSTED ST .0 04/01/06

04/01/07

0

0

0

12,000

0

Totals per Pedestrian Countdown Signal Install

Work Type: Signals 300 06 0096 / 5258

9245 S ASHLAND AVE

Work Type: TSM Install

.0

.0

Intersections 51.0

08/08/03

08/12/03

0 08/03/03

08/10/03

8,064

100

Locations

814 06 0063 / 16279

9100 S HALSTED ST

1.0

02/21/96

02/21/96

0 02/21/96

02/21/96

112,063

100

814 06 0375 / 16565

9099 S VINCENNES AVE

1.0

02/28/96

02/28/96

0 02/28/96

02/28/96

75,026

100

814 06 0166 / 16378

8700 S WALLACE ST

1.0

08/28/97

12/11/97

0 08/28/97

12/11/97

200,000

100

271 00 0039 / 4788

8700 S WOOD ST

1.0

0 07/20/98

09/30/98

15,000

814 06 0248 / 16460

140 W 87TH ST

1.0

0 12/29/89

12/29/89

84,322

Totals per TSM Install

5.0

12/29/89

12/29/89

0

486,411

37,273

503,768

Totals per Construction Phase

2,349,885

2,799,724

Totals for Ward 21

2,371,435

2,823,323

Totals per Traffic

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 227

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

3,137

100

210 06 0023 / 4298

W 26TH ST AND S KEELER AVE

.0

02/06/02

04/02/02

0 02/06/02

04/02/02

0

0

Totals per Design/Engineering

.0

0

3,137

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 228

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 03 0012 / 4883

ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE

300 03 0022 / 4893

2500 S ST LOUIS AVE

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

Fixtures .30

10/01/04

10/10/04

117 10/08/04

10/19/04

67

100

1,010.0

07/18/04

08/11/04

400,750 07/23/04

10/07/04

226,080

100

1,010.30

400,867

226,147

Fixtures

300 06 0225 / 5340

MCCORMICK SCHOOL CPS

31.0

08/16/04

08/27/04

12,707 08/16/04

08/27/04

9,193

100

300 06 0251 / 5361

MCCORMICK SCHOOL CPS

4.0

08/16/04

08/27/04

1,693 08/16/04

08/27/04

1,694

100

300 05 0022 / 5137

ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE

37.0

04/04/05

11/18/05

14,800 07/28/05

08/01/05

12,950

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

72.0

29,200

23,837

1,715,181

1,493,305

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 229

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0826 / 7012

2520 S AVERS AVE

1.0

04/23/96

04/23/96

0 04/23/96

04/23/96

300

100

805 06 0844 / 7030

3133 S AVERS AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

805 06 0814 / 7000

2444 S CENTRAL PARK AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

805 06 1930 / 8116

2502 S CHRISTIANA AVE

1.0

03/29/96

03/29/96

0 03/29/96

03/29/96

300

100

805 06 1714 / 7900

2840 S CHRISTIANA AVE

1.0

06/18/97

06/18/97

0 06/18/97

06/18/97

300

100

805 06 0742 / 6928

2637 S DRAKE AVE

1.0

03/29/96

03/29/96

0 03/29/96

03/29/96

300

100

805 06 1080 / 7266

2522 S HAMLIN AVE

1.0

06/26/96

06/26/96

0 06/26/96

06/26/96

300

100

805 06 1053 / 7239

2536 S HAMLIN AVE

1.0

06/26/96

06/26/96

0 06/26/96

06/26/96

300

100

805 06 1163 / 7349

2430 S KEDZIE AVE

1.0

04/18/96

04/18/96

0 04/18/96

04/18/96

300

100

805 06 1170 / 7356

2818 S KEELER AVE

1.0

03/27/96

03/27/96

0 03/27/96

03/27/96

300

100

805 06 1565 / 7751

2652 S KOLIN AVE

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

805 06 1713 / 7899

2722 S LAWNDALE AVE

1.0

06/18/97

06/18/97

0 06/18/97

06/18/97

300

100

805 06 1548 / 7734

3221 S LAWNDALE AVE

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 0568 / 6754

3231 S PULASKI RD

1.0

01/24/96

01/24/96

0 01/24/96

01/24/96

300

100

805 06 1463 / 7649

3211 S SPRINGFIELD AVE

1.0

12/03/97

12/03/97

0 12/03/97

12/03/97

300

100

300 06 0139 / 5289

2500 S ST LOUIS AVE

1,162.0

03/01/06

09/01/06

25,405 04/01/06

04/15/06

35,109

100

302 00 0092 / 5774

2500 S ST LOUIS AVE

8.0

0 01/18/01

01/04/02

1,885

100

805 06 0954 / 7140

3924 W 24TH ST

1.0

0 03/22/95

03/22/95

300

100

302 00 0092 / 5774

3926 W 24TH ST

1.0

0 10/23/01

10/23/01

236

100

805 06 1733 / 7919

4008 W 26TH ST

1.0

0 06/05/97

06/05/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

2512 S ST LOUIS AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2500 S ST LOUIS AVE

Work Type: Flood Light Install 300 06 0167 / 5306

2643 S CENTRAL PARK AVE

03/22/95

06/05/97

03/22/95

06/05/97

1,188.0

25,405

42,330

Lamps 1,231.0

06/01/07

12/31/07

36,240 09/01/07

10/01/07

35,145

100

0 06/04/02

06/07/02

19,956

100

0 01/09/99

01/09/99

702

100

Installations 1,096.0

Fixtures 2.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 230

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0078 / 5241

ON S PULASKI RD FROM W 25TH ST TO W 27TH ST

Work Type: Ornamental - Piggyback Lighting

Blocks 1.0

04/01/98

12/01/98

12,500 01/28/99

07/16/99

20,660

100

Fixtures

300 03 0022 / 4893

ON S KOLIN AVE FROM W 26TH ST TO W 27TH ST

10.0

05/06/04

05/06/04

13,500 05/06/04

05/11/04

1,443

100

300 06 0122 / 5275

ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD

44.0

12/10/03

12/25/03

52,800 12/08/03

12/12/03

51,509

100

300 06 0069 / 5233

ON W 26TH ST FROM S KOSTNER AVE TO S KOLIN AVE

58.0

12/20/02

01/09/03

72,500 12/28/02

02/28/03

70,097

100

300 06 0069 / 5233

ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE

29.0

12/20/02

01/09/03

36,250 12/28/02

02/28/03

35,049

100

300 05 0022 / 5137

ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE

26.0

04/04/05

11/18/05

35,100 07/28/05

08/01/05

36,510

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

2500 S ST LOUIS AVE

Work Type: Residntl Staggered Lighting

167.0

210,150

194,608

0

0

0

Lamps .0

03/01/08

12/01/08

Blocks

300 06 0308 / 5414

ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST

2.0

03/22/06

05/01/06

197,681 03/22/06

05/17/06

160,213

100

300 07 0022 / 5445

ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST

2.0

03/16/06

05/17/06

50,000 03/16/06

05/17/06

50,000

100

300 09 / 33088

ON S CENTRAL PARK AVE FROM W 26TH ST TO W CERMAK RD

4.0

30,000 04/01/08

12/01/08

0

0

300 06 0298 / 5405

ON S LAWNDALE AVE FROM W 24TH ST TO W 25TH ST

2.0

0 05/08/05

07/08/05

127,917

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

06/25/05

07/25/05

10.0

277,681

338,130

Blocks

300 06 0267 / 5375

ON S LAWNDALE AVE FROM W 26TH ST TO W 27TH ST

2.0

08/01/04

10/01/04

215,545 08/16/04

10/06/04

155,750

100

300 06 0235 / 5349

ON S LAWNDALE AVE FROM W 28TH ST TO W 30TH ST

2.0

08/15/03

10/15/03

163,727 07/23/03

10/01/03

139,874

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

2735 S KOLIN AVE

4.0

379,272

295,624

Locations 1.0

0 03/01/01

03/01/01

378

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 231

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0225 / 5340

MCCORMICK SCHOOL CPS

35.0

300 06 0108 / 5263

ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD

42.0

300 05 0022 / 5137

ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE

97.0

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

04/04/05

08/27/04

11/18/05

174.0

ON S KOSTNER AVE FROM W 31ST ST TO W 33RD ST

2.0

300 06 0247 / 5357

ON W 30TH ST FROM S KILBOURN AVE TO S KOSTNER AVE

2.0

Work Type: Traffic Signal Regrouping 2500 S ST LOUIS AVE

Work Type: Underpass Lighting

08/27/04

7,776

100

10/30/03

10,360

100

24,250 07/25/05

08/08/05

19,251

100

45,500

04/28/03

06/30/03

4.0

Totals per Strt Lighting

8,750 08/16/04 12,500 10/10/03

37,387

Blocks

300 06 0246 / 5356

300 06 0139 / 5289

08/16/04

188,250 05/22/05

09/02/05

86,189

100

100,000 04/22/03

07/07/03

99,166

100

288,250

185,355

Lamps 951.0

03/01/04

12/01/04

4,945 07/31/06

09/21/06

10,356

100

Fixtures

805 06 2198 / 8384

3100 S KEDZIE AVE

6.0

03/10/94

03/10/94

0 03/10/94

03/10/94

4,500

100

805 06 2621 / 8807

2399 S KEELER AVE

10.0

04/29/93

04/29/93

0 04/29/93

04/29/93

7,500

100

805 06 2422 / 8608

2495 S KOSTNER AVE

12.0

12/14/95

12/14/95

0 12/14/95

12/14/95

9,000

100

805 06 2620 / 8806

2395 S PULASKI RD

12.0

02/01/95

02/01/95

0 02/01/95

02/01/95

9,000

100

300 06 0217 / 5337

2600 S ST LOUIS AVE

92.0

03/12/04

03/16/04

5,171 12/12/03

12/12/03

4,190

100

805 06 2948 / 9134

4405 W 26TH ST

8.0

01/05/94

01/05/94

0 01/05/94

01/05/94

6,000

100

805 06 2348 / 8534

4501 W CERMAK RD

16.0

03/09/93

03/09/93

0 03/09/93

03/09/93

12,000

100

805 06 2955 / 9141

4400 W OGDEN AVE

14.0

12/12/95

12/12/95

0 12/12/95

12/12/95

10,500

100

Totals per Underpass Lighting

170.0

5,171

62,690

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 232

1/1/2008 AND 12/31/2008

Ward 22 Ricardo Munoz CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals

Crossings

300 06 0197 / 5322

S CENTRAL PARK AVE AND W 25TH ST

3.0

12,000 06/26/01

04/08/02

209

100

300 06 0197 / 5322

W 28TH ST AND S KEDZIE AVE

.50

2,000 06/19/01

08/01/01

153

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

2500 S ST LOUIS AVE

Work Type: TSM Install

3.50

14,000

362

Intersections 28.0

09/28/03

10/07/03

0 09/02/03

09/09/03

4,427

100

Locations

210 06 0020 / 4295

S HAMLIN AVE AND W 26TH ST

02/01/00

03/15/00

150,000 12/09/99

02/14/00

105,000

100

210 06 0022 / 4297

W 25TH ST AND S CENTRAL PARK AVE

1.0

11/07/02

04/15/03

178,000 11/01/02

01/31/03

110,835

100

210 06 0023 / 4298

W 26TH ST AND S KEELER AVE

1.0

08/25/03

11/15/03

170,700 08/22/03

10/10/03

132,551

100

814 06 0113 / 16328

3100 S HAMLIN AVE

1.0

04/29/93

04/29/93

0 04/29/93

04/29/93

83,958

100

271 00 0045 / 4794

2500 S PULASKI RD

1.0

125,660 08/01/97

08/15/99

125,660

100

814 06 0256 / 16468

2800 S PULASKI RD

1.0

0 08/17/89

08/17/89

74,970

100

08/17/89

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 05 0022 / 5137

08/17/89

ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE

Totals per Traffic

624,360

632,974

Locations 14.0

04/04/05

11/18/05

5,650 07/25/05

08/08/05

5,191

644,010

642,954

Totals per Construction Phase

2,359,191

2,136,259

Totals for Ward 22

2,359,191

2,139,396

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 233

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32969

ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST

.0

10/17/07

11/30/07

0

0

0

300 06 0308 / 5414

ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,336

100

300 06 0308 / 5414

ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,336

100

300 06 / 32277

ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST

.0

04/01/08

08/30/08

0

0

0

300 06 / 32277

ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE

.0

04/01/08

08/30/08

0

0

0

300 06 / 32146

ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE

.0

05/01/07

10/31/07

3,756

100

300 06 / 32146

ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE

.0

05/01/07

10/31/07

0

100

210 06 0127 / 4386

W 55TH ST AND S KILBOURN AVE

.50

11/01/06

11/20/06

2,500 01/17/07

210 06 0187 / 4432

W 63RD ST AND S LATROBE AVE

.50

11/15/03

02/15/04

0 11/15/03

300 06 0292 / 5399

5000 W 55TH ST

1.0

01/11/05

01/20/05

1,500 01/11/05

Totals per Design/Engineering

2.0

3,900 06/21/07

07/19/07

0

7,900

1,593

15

02/15/04

2,063

100

01/20/05

615

100

10,699

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 234

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON S LEAMINGTON AVE FROM W 46TH ST TO W 48TH ST

10.0

10/18/02

10/18/02

4,000 10/15/02

10/15/02

3,750

100

300 11 / 32212

ON S MCVICKER AVE FROM W 51ST ST TO W 52ND ST

5.0

01/11/08

01/04/08

2,200 01/04/08

01/04/08

1,545

100

300 03 0023 / 4894

ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST

57.0

07/01/04

08/01/04

21,375 06/14/04

07/28/04

13,768

100

300 03 0023 / 4894

ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST

56.0

07/01/04

08/01/04

21,000 06/14/04

07/28/04

13,526

100

300 03 0023 / 4894

ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST

54.0

07/01/04

08/01/04

20,250 06/14/04

07/28/04

13,042

100

300 03 0023 / 4894

ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST

57.0

07/01/04

08/01/04

21,375 06/14/04

07/28/04

13,768

100

300 03 0023 / 4894

ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST

34.0

07/01/04

08/01/04

12,750 06/14/04

07/28/04

8,212

100

300 03 0023 / 4894

ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

6,375 06/14/04

07/28/04

4,107

100

300 03 0023 / 4894

ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

18.0

07/01/04

08/01/04

6,750 06/14/04

07/28/04

4,347

100

300 03 0023 / 4894

ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

6,375 06/14/04

07/28/04

4,107

100

300 03 0023 / 4894

ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

6,375 06/14/04

07/28/04

4,107

100

300 03 0023 / 4894

ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

6,375 06/14/04

07/28/04

4,107

100

300 03 0023 / 4894

ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

15.0

07/01/04

08/01/04

5,625 06/14/04

07/28/04

3,623

100

300 03 0023 / 4894

ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

16.0

07/01/04

08/01/04

6,000 06/14/04

07/28/04

3,865

100

300 03 0023 / 4894

ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

13.0

07/01/04

08/01/04

4,875 06/14/04

07/28/04

3,141

100

300 03 0023 / 4894

ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

23.0

07/01/04

08/01/04

8,625 06/14/04

07/28/04

5,659

100

300 03 0023 / 4894

ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE

28.0

07/01/04

08/01/04

10,500 06/14/04

07/28/04

6,762

100

300 03 0023 / 4894

ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

28.0

07/01/04

08/01/04

10,500 06/14/04

07/28/04

6,762

100

302 00 0092 / 5774

S MERRIMAC AVE AND W 62ND ST

1.0

10/04/01

10/05/01

205 10/05/01

10/09/01

205

100

300 06 0069 / 5233

5300 S KEATING AVE

5.0

1,875 09/25/02

09/25/02

1,875

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

488.0

183,405

120,278

Fixtures

300 09 / 33089

ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST

41.0

09/29/08

10/03/08

16,400 09/29/08

10/03/08

13,602

100

300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

14.85

12/01/07

01/01/08

5,940 11/28/07

02/15/08

5,297

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

11.25

05/27/08

06/05/08

4,500 09/22/08

10/24/08

4,500

100

300 06 0069 / 5233

ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE

6.50

2,600 02/21/02

02/21/02

2,600

100

302 00 0092 / 5774

ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE

6.50

02/24/02

02/24/02

2,600 02/21/02

02/21/02

2,438

100

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

47.52

05/10/04

06/10/04

19,008 05/01/04

05/11/04

18,321

100

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

47.75

05/01/04

05/15/04

19,100 05/10/04

05/16/04

6,785

100

Totals per 400 Watt Changeout

175.37

70,148

53,543

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 235

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0714 / 6900

5102 S ARCHER AVE

1.0

12/11/96

12/11/96

0 12/11/96

12/11/96

300

100

805 06 0715 / 6901

5129 S ARCHER AVE

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

805 06 0717 / 6903

5151 S ARCHER AVE

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

805 06 0707 / 6893

5155 S ARCHER AVE

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

300 06 0139 / 5289

5838 S ARCHER AVE

2,400.0

03/01/06

09/01/06

54,637 06/26/06

07/14/06

72,514

100

302 00 0092 / 5774

5838 S ARCHER AVE

27.0

0 01/18/01

12/18/01

6,363

100

805 06 0865 / 7051

5433 S AUSTIN AVE

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 0770 / 6956

6054 S AUSTIN AVE

1.0

01/20/95

01/20/95

0 01/20/95

01/20/95

300

100

805 06 0864 / 7050

5426 S AVERS AVE

1.0

10/03/95

10/03/95

0 10/03/95

10/03/95

300

100

805 06 0378 / 6564

4620 S CICERO AVE

1.0

01/09/96

01/09/96

0 01/09/96

01/09/96

300

100

805 06 1355 / 7541

4906 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1446 / 7632

4922 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1347 / 7533

4936 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1328 / 7514

4958 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1310 / 7496

5022 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1291 / 7477

5040 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1302 / 7488

5050 S KEATING AVE

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 1200 / 7386

5129 S KENNETH AVE

1.0

07/20/95

07/20/95

0 07/20/95

07/20/95

300

100

805 06 1171 / 7357

5201 S KENNETH AVE

1.0

07/20/95

07/20/95

0 07/20/95

07/20/95

300

100

805 06 1172 / 7358

5221 S KENNETH AVE

1.0

07/20/95

07/20/95

0 07/20/95

07/20/95

300

100

805 06 1173 / 7359

5259 S KENNETH AVE

1.0

07/20/95

07/20/95

0 07/20/95

07/20/95

300

100

805 06 1021 / 7207

4901 S KILBOURN AVE

1.0

06/16/95

06/16/95

0 06/16/95

06/16/95

300

100

805 06 1479 / 7665

5420 S KILBOURN AVE

1.0

11/25/97

11/25/97

0 11/25/97

11/25/97

300

100

805 06 2032 / 8218

5141 S KILDARE AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 2016 / 8202

5203 S KILDARE AVE

1.0

08/11/95

08/11/95

0 08/11/95

08/11/95

300

100

805 06 2055 / 8241

4822 S KILPATRICK AVE

1.0

09/21/95

09/21/95

0 09/21/95

09/21/95

300

100

805 06 2036 / 8222

4840 S KILPATRICK AVE

1.0

09/21/95

09/21/95

0 09/21/95

09/21/95

300

100

805 06 2037 / 8223

4858 S KILPATRICK AVE

1.0

09/21/95

09/21/95

0 09/21/95

09/21/95

300

100

805 06 2038 / 8224

4940 S KILPATRICK AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 2039 / 8225

5022 S KILPATRICK AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 2011 / 8197

5040 S KILPATRICK AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 236

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 2047 / 8233

4401 S KNOX AVE

1.0

04/26/95

04/26/95

0 04/26/95

04/26/95

300

100

805 06 2049 / 8235

4518 S KNOX AVE

1.0

06/13/95

06/13/95

0 06/13/95

06/13/95

300

100

805 06 2050 / 8236

4822 S KNOX AVE

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 2051 / 8237

4825 S KNOX AVE

1.0

01/11/96

01/11/96

0 01/11/96

01/11/96

300

100

805 06 2052 / 8238

4836 S KNOX AVE

1.0

08/22/95

08/22/95

0 08/22/95

08/22/95

300

100

805 06 1639 / 7825

4843 S KNOX AVE

1.0

08/26/97

08/26/97

0 08/26/97

08/26/97

300

100

805 06 1640 / 7826

4855 S KNOX AVE

1.0

08/26/97

08/26/97

0 08/26/97

08/26/97

300

100

805 06 2019 / 8205

4858 S KNOX AVE

1.0

08/22/95

08/22/95

0 08/22/95

08/22/95

300

100

805 06 2065 / 8251

4859 S KNOX AVE

1.0

01/11/96

01/11/96

0 01/11/96

01/11/96

300

100

805 06 2035 / 8221

4905 S KNOX AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 2010 / 8196

4921 S KNOX AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 1981 / 8167

4922 S KNOX AVE

1.0

08/22/95

08/22/95

0 08/22/95

08/22/95

300

100

805 06 1982 / 8168

4940 S KNOX AVE

1.0

09/07/95

09/07/95

0 09/07/95

09/07/95

300

100

805 06 1984 / 8170

4941 S KNOX AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 1985 / 8171

4958 S KNOX AVE

1.0

09/07/95

09/07/95

0 09/07/95

09/07/95

300

100

805 06 1986 / 8172

4959 S KNOX AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 1971 / 8157

5005 S KNOX AVE

1.0

09/12/95

09/12/95

0 09/12/95

09/12/95

300

100

805 06 1988 / 8174

5019 S KNOX AVE

1.0

09/07/95

09/07/95

0 09/07/95

09/07/95

300

100

805 06 2009 / 8195

5022 S KNOX AVE

1.0

09/07/95

09/07/95

0 09/07/95

09/07/95

300

100

805 06 1990 / 8176

5040 S KNOX AVE

1.0

09/07/95

09/07/95

0 09/07/95

09/07/95

300

100

805 06 1991 / 8177

5041 S KNOX AVE

1.0

09/06/95

09/06/95

0 09/06/95

09/06/95

300

100

805 06 1992 / 8178

5051 S KNOX AVE

1.0

09/06/95

09/06/95

0 09/06/95

09/06/95

300

100

805 06 2018 / 8204

5111 S KOLIN AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 1966 / 8152

5119 S KOLIN AVE

1.0

07/21/95

07/21/95

0 07/21/95

07/21/95

300

100

805 06 1967 / 8153

5122 S KOLIN AVE

1.0

07/21/95

07/21/95

0 07/21/95

07/21/95

300

100

805 06 1968 / 8154

5142 S KOLIN AVE

1.0

07/21/95

07/21/95

0 07/21/95

07/21/95

300

100

805 06 1969 / 8155

5201 S KOLIN AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 1970 / 8156

5225 S KOLIN AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 1989 / 8175

5238 S KOLIN AVE

1.0

07/25/95

07/25/95

0 07/25/95

07/25/95

300

100

805 06 0352 / 6538

5119 S LEAMINGTON AVE

1.0

11/15/96

11/15/96

0 11/15/96

11/15/96

300

100

805 06 0355 / 6541

4517 S LECLAIRE AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 237

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0339 / 6525

4537 S LECLAIRE AVE

1.0

01/12/96

01/12/96

0 01/12/96

01/12/96

300

100

805 06 1880 / 8066

5719 S MASON AVE

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 1851 / 8037

5742 S MASON AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 1826 / 8012

5758 S MASON AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 1811 / 7997

5720 S MAYFIELD AVE

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 1813 / 7999

5740 S MAYFIELD AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 1814 / 8000

5758 S MAYFIELD AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 1815 / 8001

5819 S MAYFIELD AVE

1.0

09/27/95

09/27/95

0 09/27/95

09/27/95

300

100

805 06 1805 / 7991

5841 S MAYFIELD AVE

1.0

09/27/95

09/27/95

0 09/27/95

09/27/95

300

100

805 06 1843 / 8029

5844 S MAYFIELD AVE

1.0

09/26/95

09/26/95

0 09/26/95

09/26/95

300

100

302 00 0092 / 5774

5318 S MC VICKER AVE

1.0

0 09/10/01

09/10/01

236

100

805 06 1785 / 7971

5425 S MC VICKER AVE

1.0

05/01/97

05/01/97

0 05/01/97

05/01/97

300

100

805 06 1833 / 8019

6004 S MC VICKER AVE

1.0

03/24/95

03/24/95

0 03/24/95

03/24/95

300

100

805 06 1844 / 8030

6018 S MC VICKER AVE

1.0

03/16/95

03/16/95

0 03/16/95

03/16/95

300

100

805 06 1845 / 8031

6040 S MC VICKER AVE

1.0

02/08/95

02/08/95

0 02/08/95

02/08/95

300

100

805 06 1649 / 7835

5532 S MELVINA AVE

1.0

09/10/97

09/10/97

0 09/10/97

09/10/97

300

100

805 06 1654 / 7840

5655 S MELVINA AVE

1.0

07/30/97

07/30/97

0 07/30/97

07/30/97

300

100

805 06 1513 / 7699

5658 S MELVINA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

302 00 0092 / 5774

5240 S NAGLE AVE

1.0

0 10/01/01

10/01/01

0

100

805 06 1901 / 8087

5336 S NARRAGANSETT AVE

1.0

01/24/95

01/24/95

0 01/24/95

01/24/95

300

100

805 06 1902 / 8088

5540 S NARRAGANSETT AVE

1.0

08/31/95

08/31/95

0 08/31/95

08/31/95

300

100

805 06 1904 / 8090

5626 S NASHVILLE AVE

1.0

01/03/97

01/03/97

0 01/03/97

01/03/97

300

100

805 06 1905 / 8091

6222 S NASHVILLE AVE

1.0

07/19/95

07/19/95

0 07/19/95

07/19/95

300

100

805 06 1876 / 8062

6223 S NASHVILLE AVE

1.0

06/13/95

06/13/95

0 06/13/95

06/13/95

300

100

805 06 1474 / 7660

5736 S NATOMA AVE

1.0

11/17/97

11/17/97

0 11/17/97

11/17/97

300

100

805 06 1935 / 8121

5220 S NEENAH AVE

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 1926 / 8112

5827 S NEENAH AVE

1.0

01/19/95

01/19/95

0 01/19/95

01/19/95

300

100

805 06 1647 / 7833

5837 S NEVA AVE

1.0

09/08/97

09/08/97

0 09/08/97

09/08/97

300

100

805 06 1934 / 8120

5617 S NEWCASTLE AVE

1.0

01/11/96

01/11/96

0 01/11/96

01/11/96

300

100

805 06 1768 / 7954

5726 S NEWLAND AVE

1.0

05/14/97

05/14/97

0 05/14/97

05/14/97

300

100

805 06 1908 / 8094

5446 S NORDICA AVE

1.0

05/16/96

05/16/96

0 05/16/96

05/16/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 238

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1673 / 7859

6019 S NORMANDY AVE

1.0

07/24/97

07/24/97

0 07/24/97

07/24/97

300

100

805 06 0594 / 6780

5429 S NOTTINGHAM AVE

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 0578 / 6764

5607 S NOTTINGHAM AVE

1.0

07/18/96

07/18/96

0 07/18/96

07/18/96

300

100

805 06 0668 / 6854

5322 S RIDGEWAY AVE

1.0

01/23/95

01/23/95

0 01/23/95

01/23/95

300

100

805 06 0412 / 6598

5117 S TRIPP AVE

1.0

07/27/95

07/27/95

0 07/27/95

07/27/95

300

100

805 06 0388 / 6574

5229 S TRIPP AVE

1.0

07/27/95

07/27/95

0 07/27/95

07/27/95

300

100

805 06 0390 / 6576

5231 S TRIPP AVE

1.0

07/27/95

07/27/95

0 07/27/95

07/27/95

300

100

805 06 0927 / 7113

4700 W 47TH ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 1022 / 7208

4634 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

805 06 1023 / 7209

4658 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

805 06 1025 / 7211

4707 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

805 06 1026 / 7212

4724 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

805 06 1010 / 7196

4736 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

805 06 1028 / 7214

4742 W 51ST ST

1.0

09/22/95

09/22/95

0 09/22/95

09/22/95

300

100

302 00 0092 / 5774

5039 W 52ND ST

1.0

0 01/23/01

01/23/01

236

100

805 06 1624 / 7810

7151 W 54TH ST

1.0

09/12/97

09/12/97

0 09/12/97

09/12/97

300

100

805 06 1007 / 7193

5858 W 59TH ST

1.0

07/13/95

07/13/95

0 07/13/95

07/13/95

300

100

805 06 1008 / 7194

5900 W 59TH ST

1.0

09/26/95

09/26/95

0 09/26/95

09/26/95

300

100

805 06 1041 / 7227

6618 W 63RD PL

1.0

07/03/96

07/03/96

0 07/03/96

07/03/96

300

100

805 06 1013 / 7199

6301 W 63RD ST

1.0

04/13/95

04/13/95

0 04/13/95

04/13/95

300

100

805 06 1059 / 7245

6325 W 63RD ST

1.0

03/12/96

03/12/96

0 03/12/96

03/12/96

300

100

805 06 0977 / 7163

6541 W 64TH PL

1.0

01/17/96

01/17/96

0 01/17/96

01/17/96

300

100

805 06 0979 / 7165

6930 W 64TH PL

1.0

02/28/95

02/28/95

0 02/28/95

02/28/95

300

100

805 06 1782 / 7968

6415 W 64TH ST

1.0

04/29/97

04/29/97

0 04/29/97

04/29/97

300

100

805 06 1641 / 7827

6540 W 64TH ST

1.0

08/27/97

08/27/97

0 08/27/97

08/27/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

6247 S ARCHER AVE

Totals per Lighting/Electrical

2,543.0

54,637

113,249

Lamps 1,579.0

06/01/07

12/31/07

46,485 12/18/07 2,942,011

12/27/07

45,080 1,665,008

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 239

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 09 / 33089

4653 S LAWLER AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5838 S ARCHER AVE

Work Type: Flood Light Install

Blocks 1.0

04/01/08

12/01/08

6,000 04/01/08

12/01/08

12,503

100

0 07/08/02

07/11/02

27,021

100

Installations 1,484.0

Fixtures

300 06 0198 / 5323

LE CLAIRE COURTS

05/24/01

06/05/01

77,530 05/14/01

05/26/01

79,082

100

300 09 / 33089

ON S MCVICKER AVE FROM W 52ND ST TO W 53RD ST

4.0

10/02/08

10/03/08

2,000 10/02/08

10/03/08

1,017

100

300 07 0023 / 5446

ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST

7.0

04/18/06

11/18/06

3,500

300 11 / 32212

ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST

7.0

02/12/07

02/12/07

3,500 02/12/07

300 09 / 33089

ON S NEVA AVE FROM W 52ND ST TO W 53RD ST

6.0

07/11/08

07/11/08

302 00 0092 / 5774

W 48TH ST AND S LARAMIE AVE

3.0

302 00 0092 / 5774

6200 S AUSTIN AVE

302 00 0092 / 5774

0

0

02/12/07

3,500

100

3,000 07/11/08

07/11/08

2,000

100

0 07/21/01

07/21/01

1,412

100

2.0

0 10/18/01

10/18/01

807

100

4800 S LEAMINGTON AVE

5.0

0 07/27/01

07/27/01

2,353

100

302 00 0092 / 5774

6200 S MERRIMAC AVE

1.0

0 10/05/01

10/05/01

345

100

302 00 0092 / 5774

5330 S NATOMA AVE

2.0

0 10/18/01

10/18/01

807

100

302 00 0092 / 5774

6400 S NEW ENGLAND AVE

2.0

0 10/11/01

10/11/01

807

100

302 00 0092 / 5774

5140 W 48TH ST

1.0

0 07/21/01

07/21/01

471

100

302 00 0092 / 5774

5140 W 49TH ST

2.0

0 07/27/01

07/27/01

941

100

300 09 / 33089

6939 W 59TH ST

2.0

1,000 07/11/08

07/11/08

850

100

302 00 0092 / 5774

6949 W 63RD PL

1.0

0 10/11/01

10/11/01

0

100

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting

07/11/08

07/11/08

45.0

90,530

94,392

Fixtures

300 09 / 33089

ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST

35.0

10/20/08

11/05/08

47,250 10/20/08

11/05/08

46,057

100

300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

14.19

12/01/07

01/01/08

19,157 11/28/07

02/15/08

17,028

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

11.25

07/28/08

08/08/08

15,188 09/22/08

10/24/08

11,789

100

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

5.0

05/01/04

05/15/04

6,750 05/10/04

05/21/04

7,216

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

6247 S ARCHER AVE

65.44

88,344

82,090

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 240

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 11 / 32212

ON S AUSTIN AVE FROM W 51ST ST TO S ARCHER AVE

3.0

11/15/07

02/15/08

170,000

300 07 0023 / 5446

meade elec. Note Last Updated on 05-FEB-08 ON S KOSTNER AVE FROM W 47TH ST TO W 49TH ST

2.0

06/19/06

08/18/06

170,000 07/10/06

300 05 0023 / 5138

ON S KOSTNER AVE FROM W 55TH ST TO S ARCHER AVE

4.0

04/04/05

11/18/05

340,000 07/25/05

300 06 0308 / 5414

ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST

1.0

04/17/06

06/19/06

300 06 0308 / 5414

ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST

1.0

04/17/06

06/19/06

300 06 / 32277

ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST

.0

05/04/08

12/31/08

300 05 0014 / 5129

ON W 51ST ST FROM S HARDING AVE TO S LAWNDALE AVE

2.0

04/04/05

11/18/05

300 06 / 32277

ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE

.0

05/04/08

12/31/08

300 07 0014 / 5437

ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE

.0

03/01/06

12/31/06

300 06 / 32146

ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE

2.0

12/05/07

300 06 / 32146

ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE

2.0

12/05/07

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0

0

09/01/06

107,034

100

09/15/05

287,188

100

90,310 04/17/06

06/19/06

63,196

100

90,310 04/17/06

06/19/06

63,196

100

0

0

103,647

100

0

0

0

0

0

0

04/29/08

461,234

0

95

04/28/08

461,234

0

0

1,953,088

624,261

17.0

0 170,000 07/11/05

08/19/05

Blocks

300 03 0023 / 4894

ON S LEAMINGTON AVE FROM W 47TH ST TO W 49TH ST

2.0

07/01/04

08/01/04

57,000 06/14/04

09/09/04

57,000

100

300 06 0235 / 5349

ON S NASHVILLE AVE FROM W 53RD ST TO W ARCHER AVE

2.0

06/25/03

08/25/03

168,866 06/20/03

08/15/03

152,178

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 06 / 32969

ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09

4.0

225,866

209,178

Locations 1.0

12/03/07

02/29/08

60,000 01/11/08

03/28/08

34,407

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 241

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0108 / 5263

ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE

300 09 / 33089

ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST

300 11 / 32202

Locations 29.40

05/23/03

06/10/03

10,838 05/23/03

06/26/03

9,251

100

36.0

09/15/08

09/19/08

10,700 09/15/08

09/19/08

7,812

100

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

14.85

08/07/07

08/18/07

3,267 08/07/07

08/18/07

3,267

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

11.25

06/02/08

06/13/08

3,375 06/02/08

06/13/08

2,363

100

300 03 0023 / 4894

ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST

57.0

07/01/04

08/01/04

11,400 07/13/04

10/01/04

8,722

100

300 03 0023 / 4894

ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST

56.0

07/01/04

08/01/04

11,200 07/13/04

10/01/04

8,569

100

300 03 0023 / 4894

ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST

54.0

07/01/04

08/01/04

10,800 07/13/04

10/01/04

8,263

100

300 03 0023 / 4894

ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST

57.0

07/01/04

08/01/04

11,400 07/13/04

10/01/04

8,722

100

300 03 0023 / 4894

ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST

34.0

07/01/04

08/01/04

6,800 07/13/04

10/01/04

5,203

100

300 03 0014 / 4885

ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE

51.48

06/01/04

06/21/04

13,580 05/11/04

06/30/04

14,609

100

300 03 0023 / 4894

ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

3,400 07/13/04

10/01/04

2,602

100

300 03 0023 / 4894

ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

18.0

07/01/04

08/01/04

3,600 07/13/04

10/01/04

2,755

100

300 04 0216 / 5114

ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE

9.0

05/01/06

11/01/06

1,911 05/17/06

06/29/06

1,911

100

302 00 0076 / 5764

ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE

.0

09/01/00

12/31/00

300 03 0014 / 4885

ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD

51.50

05/10/04

06/16/04

15,075 05/11/04

06/04/04

11,716

100

300 03 0023 / 4894

ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

3,400 07/13/04

10/01/04

2,602

100

300 03 0023 / 4894

ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

3,400 07/13/04

10/01/04

2,602

100

300 03 0023 / 4894

ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

17.0

07/01/04

08/01/04

3,400 07/13/04

10/01/04

2,602

100

300 03 0023 / 4894

ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

15.0

07/01/04

08/01/04

3,000 07/13/04

10/01/04

2,296

100

300 03 0023 / 4894

ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

16.0

07/01/04

08/01/04

3,200 07/13/04

10/01/04

2,449

100

300 03 0023 / 4894

ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

13.0

07/01/04

08/01/04

2,600 07/13/04

10/01/04

1,990

100

300 03 0023 / 4894

ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

23.0

07/01/04

08/01/04

4,600 07/13/04

10/01/04

3,520

100

302 00 0077 / 5765

ON W 63RD PL FROM S NARRAGANSETT AVE TO S NATCHEZ AVE

5.0

0 05/14/99

05/14/99

437

100

302 00 0076 / 5764

ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE

300 03 0023 / 4894 300 03 0023 / 4894 300 06 0108 / 5263

0

36.96

09/01/00

12/31/00

ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE

28.0

07/01/04

08/01/04

5,600 07/13/04

10/01/04

4,285

100

ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE

28.0

07/01/04

08/01/04

5,600 07/13/04

10/01/04

4,285

100

W 63RD ST AND S CICERO AVE

10.0

06/25/03

07/04/03

3,800 07/25/03

08/05/03

3,290

100

Totals per Strt Light Pole Painting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

0

5838 S ARCHER AVE

722.44

0

628

155,945

126,750

Lamps 1,195.0

03/01/04

12/01/04

6,214 07/31/06

08/30/06

13,014

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 242

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

302 00 0070 / 5758

5600 N CICERO AVE

0 10/14/97

10/27/97

18,940

100

805 06 2131 / 8317

5600 N CICERO AVE

12.0

10/24/97

10/24/97

0 10/24/97

10/24/97

9,000

100

805 06 2132 / 8318

5600 N CICERO AVE

13.0

11/03/97

11/03/97

0 11/03/97

11/03/97

9,750

100

805 06 2133 / 8319

5600 N CICERO AVE

12.0

10/23/97

10/23/97

0 10/23/97

10/23/97

9,000

100

805 06 2134 / 8320

5600 N CICERO AVE

12.0

10/27/97

10/27/97

0 10/27/97

10/27/97

9,000

100

300 06 0217 / 5337

5838 S ARCHER AVE

24.0

08/17/04

08/19/04

1,349 08/16/04

08/23/04

7,052

100

805 06 2281 / 8467

4150 S CICERO AVE

6.0

12/09/96

12/09/96

0 12/09/96

12/09/96

4,500

100

805 06 2307 / 8493

4150 S CICERO AVE

18.0

12/09/96

12/09/96

0 12/09/96

12/09/96

13,500

100

805 06 2461 / 8647

5399 S CICERO AVE

22.0

07/19/93

07/19/93

0 07/19/93

07/19/93

16,500

100

805 06 2575 / 8761

4625 W 47TH ST

16.0

04/01/95

04/01/95

0 04/01/95

04/01/95

12,000

100

Totals per Underpass Lighting

135.0

1,349

109,242

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 243

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S AUSTIN AVE AND W 63RD ST

.50

0 08/29/02

08/29/02

4,675

100

210 06 0130 / 4389

S CICERO AVE AND W 59TH ST

.50

0 11/05/02

11/05/02

925

100

210 06 0130 / 4389

S KOSTNER AVE AND W 47TH ST

.50

0 10/18/01

10/18/01

4,270

100

210 06 0130 / 4389

S MELVINA AVE AND W 63RD ST

.50

0 08/28/02

08/28/02

4,675

100

210 06 0130 / 4389

S NARRAGANSETT AVE AND W 63RD ST

1.0

0 08/22/02

08/22/02

9,349

100

210 06 0130 / 4389

S OAK PARK AVE AND W 63RD ST

1.0

0 08/20/02

08/20/02

8,944

100

4.0

0

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

Locations

300 05 0023 / 5138

S ARCHER AVE AND S KEELER AVE

1.0

04/04/05

11/18/05

75,000 04/18/06

300 05 0023 / 5138

W 63RD ST AND S NARRAGANSETT AVE

1.0

04/04/05

11/18/05

75,000 05/15/06

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0127 / 4386

W 55TH ST AND S KILBOURN AVE

Work Type: Removal Temp Wiring - Signals

32,837

2.0

05/30/06

36,584

100

95,430

80

150,000

132,014

105,000

161,541

100

Locations .50

12/01/06

03/31/07

Crossings

300 06 0197 / 5322

W 63RD ST AND S LATROBE AVE

.50

2,000 06/08/01

08/01/01

134

100

300 06 0197 / 5322

W 63RD ST AND S NARRAGANSETT AVE

1.0

4,000 06/08/01

07/11/01

4,039

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

5838 S ARCHER AVE

1.50

6,000

4,173

Intersections 38.0

09/01/03

09/07/03

0 08/15/03 563,447

08/20/03

6,009 2,024,337

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 244

1/1/2008 AND 12/31/2008

Ward 23 Michael R. Zalewski CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0187 / 4432

W 63RD ST AND S LATROBE AVE

.50

06/01/04

08/15/06

100,000 06/14/04

09/27/06

89,629

100

210 06 0217 / 4457

W ARCHER AVE AND S SAYRE AVE

1.0

10/01/05

12/01/05

200,000 09/02/05

11/22/05

192,731

100

814 06 0282 / 16494

5048 N CICERO AVE

1.0

10/08/91

10/08/91

0 10/08/91

10/08/91

134,857

100

814 06 0150 / 16364

6201 N NAGLE AVE

1.0

08/29/90

08/29/90

0 08/29/90

08/29/90

103,851

100

814 06 0096 / 16312

5500 S CENTRAL AVE

1.0

02/09/95

02/09/95

0 02/09/95

02/09/95

239,189

100

814 06 0348 / 16546

4700 S CICERO AVE

1.0

03/16/89

03/16/89

0 03/16/89

03/16/89

418,644

100

814 06 0349 / 16547

5200 S CICERO AVE

1.0

07/10/90

07/10/90

0 07/10/90

07/10/90

418,644

100

814 06 0080 / 16296

5000 W 55TH ST

1.0

11/18/94

11/18/94

0 11/18/94

11/18/94

88,242

100

7.50

Totals per TSM Install

Work Type: Traffic Equipment Painting

300,000

1,685,787

Locations

300 11 / 32202

ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST

.66

08/07/07

08/18/07

297 08/07/07

08/18/07

297

100

300 09 / 33079

ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST

.75

06/02/08

06/13/08

150 06/02/08

06/13/08

63

100

300 09 / 33089

W 55TH ST AND S AUSTIN AVE

1.0

09/22/08

09/23/08

2,000 09/22/08

09/23/08

1,617

100

2.41

2,447

1,977

Totals per Construction Phase

3,505,458

3,689,345

Totals for Ward 23

3,513,358

3,700,044

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 245

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32277

ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST

300 09 / 33078

ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD

210 06 0127 / 4386 210 06 0243 / 4480

Projects 4.0

04/01/08

08/30/08

260,000 03/29/08

05/19/08

0

.0

01/01/08

05/30/08

0 04/01/08

12/01/08

0

0

S KEDZIE AVE AND W ROOSEVELT RD

1.0

12/15/05

03/15/06

0 12/15/05

02/09/06

939

100

W HARRISON ST AND S LARAMIE AVE

.0

12/26/06

01/26/07

250 12/26/06

01/26/07

638

100

Totals per Design/Engineering

5.0

260,250

1,577

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 246

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 05 0024 / 5139

ON S CHRISTIANA AVE FROM W DOUGLAS BLVD TO W 16TH ST

6.0

04/04/05

11/18/05

3,300 07/15/05

08/10/05

1,314

100

300 05 0024 / 5139

ON S KILBOURN AVE FROM W LEXINGTON ST TO W FIFTH AVE

6.0

04/04/05

11/18/05

3,300 07/15/05

08/10/05

1,314

100

300 05 0024 / 5139

ON S LAWNDALE AVE FROM W 18TH ST TO W OGDEN AVE

6.0

04/04/05

11/18/05

3,300 07/15/05

08/10/05

1,314

100

300 05 0024 / 5139

ON S SPRINGFIELD AVE FROM W 18TH ST TO W 19TH ST

3.0

04/04/05

11/18/05

2,100 07/15/05

08/10/05

657

100

300 03 0012 / 4883

ON S TROY ST FROM W 24TH ST TO W 25TH ST

2.50

10/01/04

10/10/04

975 10/08/04

10/19/04

559

100

300 05 0024 / 5139

ON W 21ST ST FROM S KEELER AVE TO S KILDARE AVE

5.0

04/04/05

11/18/05

2,200 07/15/05

08/10/05

4,502

100

300 03 0012 / 4883

ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE

.55

10/01/04

10/10/04

215 10/08/04

10/19/04

123

100

300 05 0024 / 5139

ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE

6.0

04/04/05

11/18/05

3,300 07/15/05

08/10/05

1,314

100

300 06 0122 / 5275

ON W CULLERTON ST FROM S KARLOV AVE TO S KEELER AVE

5.0

11/20/03

11/20/03

2,075 11/18/03

11/19/03

1,151

100

300 05 0024 / 5139

ON W FLOURNOY ST FROM S HOMAN AVE TO S ST LOUIS AVE

3.0

04/04/05

11/18/05

2,100 07/15/05

08/10/05

657

100

300 05 0024 / 5139

ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE

1.50

04/04/05

11/18/05

1,050 07/15/05

08/10/05

329

100

300 05 0024 / 5139

ON W VAN BUREN ST FROM S KILPATRICK AVE TO S CICERO AVE

6.0

04/04/05

11/18/05

3,300 07/15/05

08/10/05

1,314

100

302 00 0092 / 5774

S KILPATRICK AVE AND W CONGRESS PKWY

1.0

02/02/02

02/02/02

203 01/30/02

01/30/02

210

100

300 06 0069 / 5233

2100 S KARLOV AVE

1.0

09/08/02

09/08/02

210 09/05/02

09/05/02

203

100

300 06 0122 / 5275

1600 S KOMENSKY AVE

4.0

08/01/04

08/02/04

1,700 08/01/04

08/01/04

1,850

100

300 06 0122 / 5275

2300 S TROY ST

4.0

08/01/04

08/02/04

1,700 04/30/04

04/30/04

1,114

100

302 00 0092 / 5774

3400-3499 W 12TH PL

5.0

10/18/01

10/18/01

1,029 09/29/01

09/29/01

1,029

100

300 06 0069 / 5233

3800 W FILLMORE ST

5.0

06/19/02

06/19/02

1,050 06/16/02

06/16/02

1,015

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

70.55

33,107

19,968

Fixtures

300 05 0024 / 5139

ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD

68.0

04/04/05

11/18/05

27,200 07/15/05

08/10/05

23,800

100

300 07 0024 / 5447

ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE

38.0

04/18/06

11/18/06

15,600 11/01/06

11/13/06

0

100

300 07 0024 / 5447

ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE

23.0

04/18/06

11/18/06

9,200 11/01/06

11/13/06

0

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

129.0

52,000

23,800

2,411,019

1,973,703

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 247

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0792 / 6978

2114 S ALBANY AVE

1.0

10/31/95

10/31/95

0 10/31/95

10/31/95

300

100

805 06 0793 / 6979

2144 S ALBANY AVE

1.0

10/31/95

10/31/95

0 10/31/95

10/31/95

300

100

805 06 1160 / 7346

621 S KEDVALE AVE

1.0

05/09/96

05/09/96

0 05/09/96

05/09/96

300

100

805 06 2022 / 8208

620 S KOLMAR AVE

1.0

10/05/95

10/05/95

0 10/05/95

10/05/95

300

100

805 06 0935 / 7121

4014 W 16TH ST

1.0

10/23/96

10/23/96

0 10/23/96

10/23/96

300

100

805 06 0748 / 6934

3137 W ARTHINGTON ST

1.0

07/19/95

07/19/95

0 07/19/95

07/19/95

300

100

805 06 1104 / 7290

4525 W HARRISON ST

1.0

10/10/95

10/10/95

0 10/10/95

10/10/95

300

100

805 06 1762 / 7948

4736 W POLK ST

1.0

05/09/97

05/09/97

0 05/09/97

05/09/97

300

100

300 06 0139 / 5289

4325 W ROOSEVELT RD

1,099.0

03/01/06

09/01/06

27,116 05/10/06

06/10/06

33,205

100

302 00 0092 / 5774

4325 W ROOSEVELT RD

8.0

0 02/19/01

09/25/01

1,885

100

1,115.0

Totals per Alley Lighting/Lamps

4325 W ROOSEVELT RD

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1,953.0

Work Type: Flood Light Install W ARTHINGTON ST AND S KEDZIE AVE

300 06 0071 / 5234

1401 S SACRAMENTO AVE

302 00 0092 / 5774

1522 S SAWYER AVE

302 00 0092 / 5774

4941 W VAN BUREN ST

06/01/07

12/31/07

57,496 06/05/07

07/31/07

57,496

100

0 06/12/02

06/15/02

32,010

100

Installations

4325 W ROOSEVELT RD

300 06 0167 / 5306

37,490

Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

27,116

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting

1,758.0

Fixtures 4.0

0 05/06/99

05/06/99

1,404

100

81,000 02/17/99

04/20/00

31,745

100

1.0

0 10/04/01

10/04/01

404

100

1.0

0 05/07/01

05/07/01

471

100

02/15/99

04/15/00

6.0

81,000

34,024

Fixtures

300 05 0024 / 5139

ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD

80.0

04/04/05

11/18/05

108,000 07/15/05

08/10/05

79,544

100

300 07 0024 / 5447

ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE

30.0

04/18/06

11/18/06

40,500 12/10/06

12/22/06

0

100

300 07 0024 / 5447

ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE

12.0

04/18/06

11/18/06

16,200 12/10/06

12/22/06

0

100

Totals per Ornamental - Piggyback Lighting

122.0

164,700

79,544

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 248

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting 300 09 / 33090

ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD

Work Type: Residential Regrouping 300 06 0270 / 5378

1630 S CENTRAL PARK AVE

Blocks .50

50,000 04/01/08

12/01/08

0

0

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 249

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 11 / 32213

ON S ALBANY AVE FROM W CERMAK RD TO W 23RD ST

1.0

01/18/08

04/09/08

55,000 01/18/08

04/09/08

52,104

100

300 09 / 33090

ON S AVERS AVE FROM W ROOSEVELT RD TO W 14TH ST

2.0

04/05/08

05/19/08

130,000 04/01/08

12/01/08

0

100

300 11 / 32213

ON S DRAKE AVE FROM W 16TH ST TO W 18TH ST

1.0

01/18/08

03/28/08

55,000 01/18/08

04/09/08

51,743

100

300 09 / 33090

ON S DRAKE AVE FROM W 18TH ST TO W OGDEN AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 06 / 32277

ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST

.0

05/04/08

12/31/08

0

300 09 / 33090

ON S KARLOV AVE FROM W 14TH ST TO W 16TH ST

2.0

04/02/08

04/15/08

130,000 04/01/08

300 11 / 32213

ON S LAWNDALE AVE FROM W ROOSEVELT RD TO W 13TH ST

1.0

01/18/08

03/28/08

300 11 / 32213

ON S RIDGEWAY AVE FROM W 15TH ST TO W 16TH ST

1.0

01/18/08

03/28/08

300 11 / 32213

ON S SAWYER AVE FROM W 19TH ST TO W 21ST ST

1.0

11/27/07

300 11 / 32213

ON S SPAULDING AVE FROM W 15TH ST TO W 16TH ST

1.0

300 11 / 32213

ON S SPAULDING AVE FROM W 19TH ST TO W 21ST ST

300 09 / 33090

0

0

12/01/08

0

100

55,000 01/18/08

04/09/08

51,830

100

55,000 01/18/08

04/09/08

51,953

100

01/25/08

55,000 11/27/07

01/25/08

60,348

100

11/27/07

01/25/08

55,000 11/27/07

01/25/08

60,881

100

1.0

01/18/08

03/28/08

55,000 01/18/08

04/25/08

51,408

100

ON S ST LOUIS AVE FROM W 16TH ST TO W OGDEN AVE

2.0

03/22/08

03/27/08

0 04/01/08

12/01/08

130,000

100

300 06 0298 / 5405

ON S ST LOUIS AVE FROM W OGDEN AVE TO W CERMAK RD

2.0

0 10/11/05

12/02/05

107,801

100

300 11 / 32213

ON S TROY ST FROM W FILLMORE ST TO W ROOSEVELT RD

1.0

55,000 10/15/07

01/11/08

49,451

100

300 09 / 33090

ON S TROY ST FROM W ROOSEVELT RD TO W DOUGLAS BLVD

2.0

130,000 04/01/08

12/01/08

0

0

300 11 / 32213

ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE

1.0

10/15/07

01/11/08

55,000 10/15/07

01/11/08

49,051

100

300 11 / 32213

ON W FLOURNOY ST FROM S SPAULDING AVE TO S HOMAN AVE

1.0

10/15/07

01/11/08

55,000 10/15/07

01/11/08

49,551

100

300 11 / 32213

ON W FLOURNOY ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE

1.0

10/15/07

01/11/08

55,000 10/15/07

01/11/08

49,668

100

300 11 / 32213

ON W GLADYS AVE FROM S CICERO AVE TO S KILPATRICK AVE

1.0

01/18/08

03/28/08

55,000 01/18/08

04/25/08

51,563

100

300 11 / 32213

ON W GLADYS AVE FROM S CICERO AVE TO S LAVERGNE AVE

2.0

11/27/07

01/25/08

110,000 11/27/07

01/25/08

120,500

100

300 09 / 33090

ON W GLADYS AVE FROM S KOSTNER AVE TO S KOLMAR AVE

2.0

130,000 04/01/08

12/01/08

0

0

300 11 / 32213

ON W LEXINGTON ST FROM S ALBANY AVE TO S KEDZIE AVE

1.0

55,000 10/15/07

01/11/08

49,382

100

300 09 / 33090

ON W LEXINGTON ST FROM S SPAULDING AVE TO S ST LOUIS AVE

2.0

300 11 / 32213

ON W LEXINGTON ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE

300 11 / 32213

ON W LEXINGTON ST FROM S ST LOUIS AVE TO S LAWNDALE AVE

300 09 / 33090

ON W VAN BUREN ST FROM S KOSTNER AVE TO S KOLMAR AVE

300 11 / 32213

ON W VAN BUREN ST FROM S SPRINGFIELD AVE TO S PULASKI RD

Totals per Residntl Staggered Lighting

10/15/07

01/11/08

10/15/07

01/11/08

130,000 04/01/08

12/01/08

0

0

1.0

01/04/08

03/28/08

55,000 11/28/07

01/11/08

49,081

100

1.0

10/15/07

01/11/08

55,000 10/15/07

01/11/08

49,081

100

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

1.0

11/27/07

01/25/08

55,000 11/27/07

01/25/08

60,881

100

32.0

1,640,000

1,196,277

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 250

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 03 0024 / 4895

ON S TROY ST FROM W OGDEN AVE TO W 21ST ST

10/01/04

11/15/04

8,752 10/08/04

12/14/04

2,113

100

300 06 0122 / 5275

ON S TROY ST FROM W OGDEN AVE TO W 21ST ST

10/02/04

11/30/04

17,887 10/08/04

12/14/04

17,887

100

300 06 0267 / 5375

ON S TROY ST FROM W OGDEN AVE TO W 21ST ST

10/01/04

12/01/04

150,000 10/08/04

12/14/04

141,901

100

300 03 0024 / 4895

ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE

10/01/04

11/15/04

8,752 10/08/04

12/14/04

2,113

100

300 06 0122 / 5275

ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE

10/02/04

11/30/04

17,887 10/08/04

12/14/04

17,887

100

300 03 0024 / 4895

ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE

10/01/04

11/15/04

8,752 10/08/04

12/14/04

2,113

100

300 06 0122 / 5275

ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE

10/02/04

11/30/04

17,887 10/08/04

12/14/04

17,887

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

2.0

2.0

229,917

201,901

Locations

302 00 0092 / 5774

1303 S LAWNDALE AVE

2.0

0 02/20/01

02/20/01

756

100

302 00 0092 / 5774

1325 S LAWNDALE AVE

1.0

0 02/20/01

02/20/01

378

100

302 00 0092 / 5774

1400 S ST LOUIS AVE

1.0

0 03/01/01

03/01/01

378

100

302 00 0092 / 5774

4935 W VAN BUREN ST

1.0

0 05/07/01

05/07/01

378

100

302 00 0092 / 5774

4949 W VAN BUREN ST

1.0

0 05/07/01

05/07/01

378

100

6.0

0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

2,268

Locations

300 05 0024 / 5139

ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD

76.0

04/04/05

11/18/05

24,500 08/01/05

09/08/05

16,439

100

300 04 0216 / 5114

ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD

16.0

05/01/06

11/01/06

3,461 05/17/06

08/30/06

3,461

100

300 07 0024 / 5447

ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE

30.0

04/18/06

11/18/06

7,500 07/16/06

07/24/06

6,360

100

300 07 0024 / 5447

ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE

12.0

04/18/06

11/18/06

3,000 07/16/06

07/24/06

2,544

100

300 06 0081 / 5244

4600 W ROOSEVELT RD

0 05/22/98

05/22/98

444

100

Totals per Strt Light Pole Painting

Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

4325 W ROOSEVELT RD

7.0 141.0

38,461

29,248

Lamps 3,162.0

06/01/06

12/31/06

18,000 09/20/06

09/27/06

16,442

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 251

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2585 / 8771

1000 S ALBANY AVE

805 06 2799 / 8985

2201 S CENTRAL PARK AVE

805 06 2806 / 8992

Fixtures 18.0

05/09/95

05/09/95

0 05/09/95

05/09/95

13,500

100

6.0

05/18/94

05/18/94

0 05/18/94

05/18/94

4,500

100

1001 S CICERO AVE

10.0

12/31/93

12/31/93

0 12/31/93

12/31/93

7,500

100

805 06 2592 / 8778

1095 S HOMAN AVE

22.0

03/20/95

03/20/95

0 03/20/95

03/20/95

16,500

100

805 06 2589 / 8775

1005 S INDEPENDENCE BLVD

14.0

05/12/93

05/12/93

0 05/12/93

05/12/93

10,500

100

805 06 2591 / 8777

1005 S INDEPENDENCE BLVD

12.0

05/12/93

05/12/93

0 05/12/93

05/12/93

9,000

100

805 06 2805 / 8991

1000 S KARLOV AVE

14.0

04/20/94

04/20/94

0 04/20/94

04/20/94

10,500

100

805 06 2586 / 8772

1001 S KEDZIE AVE

14.0

08/27/91

08/27/91

0 08/27/91

08/27/91

10,500

100

302 00 0071 / 5759

1020 S KEDZIE AVE

0 10/20/98

10/30/98

12,305

100

805 06 2949 / 9135

2105 S KEDZIE AVE

8.0

02/23/94

02/23/94

0 02/23/94

02/23/94

6,000

100

805 06 2595 / 8781

1005 S KEELER AVE

10.0

05/04/95

05/04/95

0 05/04/95

05/04/95

7,500

100

805 06 2243 / 8429

600 S KOLMAR AVE

10.0

04/19/93

04/19/93

0 04/19/93

04/19/93

7,500

100

805 06 2807 / 8993

820 S KOSTNER AVE

10.0

04/14/94

04/14/94

0 04/14/94

04/14/94

7,500

100

805 06 2804 / 8990

1095 S PULASKI RD

10.0

04/26/94

04/26/94

0 04/26/94

04/26/94

7,500

100

805 06 2801 / 8987

1095 S SPAULDING AVE

24.0

04/20/94

04/20/94

0 04/20/94

04/20/94

18,000

100

805 06 2473 / 8659

1005 S SPRINGFIELD AVE

6.0

08/17/95

08/17/95

0 08/17/95

08/17/95

4,500

100

805 06 2366 / 8552

4595 W FIFTH AVE

12.0

06/14/93

06/14/93

0 06/14/93

06/14/93

9,000

100

805 06 2931 / 9117

4535 W HARRISON ST

10.0

04/19/93

04/19/93

0 04/19/93

04/19/93

7,500

100

302 00 0070 / 5758

4600 W HARRISON ST

0 01/15/98

01/23/98

15,405

100

805 06 2915 / 9101

4535 W JACKSON BLVD

11.0

03/01/94

03/01/94

0 03/01/94

03/01/94

8,250

100

805 06 2242 / 8428

4533 W LEXINGTON ST

4.0

09/04/96

09/04/96

0 09/04/96

09/04/96

3,000

100

805 06 2368 / 8554

4535 W POLK ST

10.0

04/02/93

04/02/93

0 04/02/93

04/02/93

7,500

100

300 06 0217 / 5337

4325 W ROOSEVELT RD

342.0

12/22/03

12/29/03

19,223 12/15/03

12/19/03

18,275

100

805 06 2369 / 8555

4547 W ROOSEVELT RD

18.0

10/23/95

10/23/95

0 10/23/95

10/23/95

13,500

100

805 06 2153 / 8339

4535 W VAN BUREN ST

10.0

06/24/93

06/24/93

0 06/24/93

06/24/93

7,500

100

Totals per Underpass Lighting

605.0

19,223

243,235

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 252

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S PULASKI RD AND W 15TH ST

1.0

0 07/12/02

07/12/02

7,324

100

210 06 0130 / 4389

S SPAULDING AVE AND W ROOSEVELT RD

1.0

0 08/16/02

08/16/02

8,539

100

2.0

0

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0127 / 4386

S KEDZIE AVE AND W ROOSEVELT RD

Work Type: New Signal 210 06 0138 / 4396

3300 W ROOSEVELT RD

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W HARRISON ST AND S LARAMIE AVE

Work Type: Removal Temp Wiring - Signals

15,863

Locations 1.0

09/30/06

10/30/06

95,000 05/03/06

09/01/06

85,537

100

10/01/02

01/01/03

222,600 06/14/02

08/16/02

190,585

100

03/15/06

05/08/07

6,000 12/26/06

02/13/07

2,959

100

Locations 1.0

Locations .0

Crossings

300 06 0197 / 5322

S KEELER AVE AND W 16TH ST

3.0

12,000 07/11/01

08/01/01

3,278

100

300 06 0197 / 5322

W 19TH ST AND S PULASKI RD

2.0

8,000 06/14/01

06/27/01

6,348

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

4325 W ROOSEVELT RD

Work Type: TSM Install

5.0

20,000

9,626

Intersections 55.0

11/10/03

11/12/03

0 11/01/03

11/10/03

8,697

100

Locations

210 06 0022 / 4297

S PULASKI RD AND W 15TH ST

1.0

06/01/02

10/01/02

186,800 04/18/02

07/12/02

108,292

100

814 06 0218 / 16430

348 N CICERO AVE

1.0

08/07/92

08/07/92

0 08/07/92

08/07/92

40,173

100

814 06 0219 / 16431

600 S CICERO AVE

1.0

02/13/92

02/13/92

0 02/13/92

02/13/92

40,173

100

814 06 0224 / 16436

700 S CICERO AVE

1.0

03/12/92

03/12/92

0 03/12/92

03/12/92

40,173

100

814 06 0221 / 16433

728 S CICERO AVE

1.0

03/12/92

03/12/92

0 03/12/92

03/12/92

40,173

100

210 06 0138 / 4396

1132 S HOMAN AVE

1.0

12/01/02

03/01/03

200,000 11/07/02

01/29/03

152,161

100

210 06 0034 / 4305

2300 S KEDZIE AVE

1.0

07/01/98

09/30/98

160,000 12/01/98

05/14/99

145,518

100

Totals per TSM Install Totals per Traffic

7.0

546,800

566,663

900,050

891,075

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 253

1/1/2008 AND 12/31/2008

Ward 24 Sharon Denise Dixon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting 300 05 0024 / 5139

ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD

300 07 0024 / 5447

ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE

Locations 32.0

04/04/05

11/18/05

6,900 08/01/05

09/08/05

9,661

100

7.0

04/18/06

11/18/06

2,750 07/16/06

07/24/06

1,484

100

39.0

9,650

11,145

Totals per Construction Phase

3,311,069

2,864,778

Totals for Ward 24

3,571,319

2,866,354

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 254

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414

ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST

300 06 0282 / 5390

ON S MORGAN ST FROM W 14TH PL TO W 15TH ST

Projects .0

02/01/06

07/31/06

0 02/01/06

07/31/06

995

100

1.0

11/16/04

02/15/05

15,000 11/01/04

02/15/05

13,417

100

300 06 0292 / 5399

S. Morgan from 14PL. to W. 15th PL/Work to be constructed by Private contractor. BOE to be notified by inspectional sevices when completed and approved. Note Last Updated on 22-FEB-07 ON W 15TH ST FROM S HALSTED ST TO S UNION AVE 04/20/05 04/29/05 6,500 04/06/05 11/15/05 2,873 2.0

100

300 06 0308 / 5414

ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD

300 06 0282 / 5390

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

995

100

1650 S BLUE ISLAND AVE

1.0

08/27/04

12/01/04

4,000 09/01/04

09/08/04

1,728

100

300 06 0292 / 5399

2432 S BLUE ISLAND AVE

1.0

08/02/05

09/01/05

1,000 08/02/05

09/01/05

448

100

300 06 0292 / 5399

2437 S DAMEN AVE

1.0

05/20/05

05/24/05

2,000 05/20/05

05/24/05

0

100

300 06 0292 / 5399

837 S WESTERN AVE

1.0

1,500 02/22/05

03/01/05

0

100

Totals per Design/Engineering

7.0

30,000

20,456

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 255

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0122 / 5275

ON S PAULINA ST FROM W CERMAK RD TO W 16TH ST

300 09 / 33091

ON S WOLCOTT AVE FROM S BLUE ISLAND AVE TO W CERMAK RD

300 06 0122 / 5275

Fixtures 21.0

05/12/03

05/12/03

8,275 05/12/03

05/16/03

3,658

100

9.0

08/14/08

08/15/08

3,600 08/14/08

08/15/08

1,945

100

ON S WOLCOTT AVE FROM W CERMAK RD TO W 16TH ST

13.0

05/12/03

05/12/03

5,275 05/12/03

05/15/03

2,271

100

300 06 0122 / 5275

ON S WOOD ST FROM W CERMAK RD TO W 16TH ST

16.0

05/15/03

05/15/03

6,400 05/15/03

05/16/03

2,789

100

300 06 0122 / 5275

ON W 19TH ST FROM S ASHLAND AVE TO S DAMEN AVE

18.0

05/15/03

05/15/03

7,150 05/15/03

05/16/03

3,145

100

300 09 / 33091

ON W 22ND PL FROM S DAMEN AVE TO S WOLCOTT AVE

4.0

08/14/08

08/15/08

1,600 08/14/08

08/15/08

973

100

300 06 0122 / 5275

ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE

2.0

10/20/03

10/21/03

850 11/05/03

11/05/03

850

100

300 09 / 33091

ON W 23RD ST FROM S DAMEN AVE TO S WOLCOTT AVE

4.0

08/14/08

08/15/08

1,600 08/14/08

08/15/08

973

100

300 06 0122 / 5275

ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE

2.0

11/01/03

11/01/03

850 11/05/03

11/05/03

850

100

300 06 0122 / 5275

ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE

2.0

11/01/03

11/01/03

850 11/05/03

11/05/03

850

100

300 06 0122 / 5275

ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE

2.0

11/01/03

11/01/03

850 11/05/03

11/05/03

850

100

300 06 0122 / 5275

ON W CULLERTON ST FROM S ASHLAND AVE TO S DAMEN AVE

20.0

05/14/03

05/14/03

7,900 05/14/03

05/16/03

3,490

100

300 06 0069 / 5233

ON W CULLERTON ST FROM S HALSTED ST TO S RACINE AVE

14.0

08/10/02

08/10/02

2,940 08/07/02

08/07/02

2,842

100

300 09 / 33091

ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST

10.0

02/01/08

12/31/08

4,000 08/25/08

08/26/08

2,430

100

300 06 0122 / 5275

800 S ABERDEEN ST

5.0

02/22/03

02/22/03

1,050 02/19/03

02/19/03

1,015

100

300 06 0122 / 5275

2200 S BELL AVE

5.0

05/08/03

05/08/03

1,050 05/05/03

05/05/03

1,015

100

302 00 0092 / 5774

2400 S BELL AVE

4.0

02/08/02

02/08/02

840 02/05/02

02/05/02

840

100

300 06 0122 / 5275

800 S CARPENTER ST

5.0

02/22/03

02/22/03

1,050 02/19/03

02/19/03

1,015

100

300 06 0069 / 5233

800 S CLAREMONT AVE

5.0

10/11/02

10/11/02

1,050 10/08/02

10/08/02

1,015

100

302 00 0092 / 5774

2300-2399 S HOYNE AVE

5.0

0 10/02/01

10/02/01

1,029

100

302 00 0092 / 5774

2200 S LEAVITT ST

4.0

02/08/02

02/08/02

840 02/05/02

02/05/02

840

100

302 00 0092 / 5774

2300 S LEAVITT ST

6.0

02/08/02

02/08/02

1,260 02/05/02

02/05/02

1,218

100

302 00 0092 / 5774

800 S MAY ST

3.0

0 08/20/01

08/20/01

617

100

300 06 0069 / 5233

700 W 17TH PL

5.0

08/10/02

08/10/02

1,050 08/07/02

08/07/02

1,015

100

300 06 0069 / 5233

2200 W 19TH ST

5.0

11/07/02

11/07/02

1,050 11/04/02

11/04/02

1,015

100

300 06 0122 / 5275

2300 W 22ND PL

4.0

06/01/03

06/03/03

1,900 05/06/03

05/06/03

911

100

300 06 0069 / 5233

300 W 23RD PL

5.0

10/11/02

10/11/02

1,050 10/08/02

10/08/02

1,015

100

302 00 0092 / 5774

2100-2199 W 23RD ST

5.0

10/02/01

10/02/01

1,029 10/02/01

10/02/01

1,029

100

300 06 0069 / 5233

400 W 24TH ST

5.0

07/19/02

07/19/02

1,050 07/16/02

07/16/02

1,015

100

302 00 0092 / 5774

2000-2099 W COULTER ST

5.0

0 10/02/01

10/02/01

1,029

100

302 00 0092 / 5774

2100-2199 W COULTER ST

5.0

0 10/02/01

10/02/01

1,029

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 256

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 302 00 0092 / 5774

2200 W COULTER ST

300 06 0122 / 5275

1400 W FLOURNOY ST

302 00 0092 / 5774

1200-1399 W LEXINGTON ST

300 06 0122 / 5275

1400 W LEXINGTON ST

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 09 / 33091

ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST

300 11 / 32214

ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST

300 06 0122 / 5275

ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST

300 09 / 33091

Fixtures 4.0

02/02/02

02/02/02

20.0

840 01/30/02

01/30/02

812

100

7,500 01/15/03

01/19/03

5,410

100

5.0

10/20/01

10/20/01

1,029 09/28/01

09/28/01

1,029

100

21.0

08/01/04

08/05/04

7,875 01/15/03

01/19/03

5,680

100

268.0

83,653

57,509

Fixtures 3.0

11/05/08

11/13/08

1,200 11/05/08

11/06/08

996

100

22.0

10/25/07

10/25/07

9,200 10/25/07

10/25/07

5,899

100

103.0

11/20/03

12/10/03

45,000 11/05/03

11/10/03

26,781

100

ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE

15.0

10/21/08

10/30/08

6,000 10/21/08

10/30/08

4,875

100

300 09 / 33091

ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST

11.0

02/01/08

12/31/08

4,400 09/24/08

09/26/08

3,740

100

300 11 / 32214

ON W CULLERTON ST FROM S OAKLEY AVE TO S WESTERN AVE

5.0

10/25/07

10/25/07

2,200 10/25/07

10/25/07

1,468

100

300 09 / 33068

ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE

2.0

10/13/08

10/17/08

800 10/06/08

10/08/08

800

100

300 09 / 33091

ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST

12.0

02/01/08

12/31/08

4,800 09/08/08

09/09/08

3,984

100

302 00 0092 / 5774

W 24TH ST AND S LEAVITT ST

1.0

03/08/02

03/08/02

400 03/05/02

03/05/02

375

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

174.0

74,000

48,918

1,761,370

3,540,922

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 257

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0883 / 7069

820 S BELL AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 0881 / 7067

821 S BELL AVE

1.0

11/21/96

11/21/96

0 11/21/96

11/21/96

300

100

805 06 1679 / 7865

1618 S BLUE ISLAND AVE

1.0

07/29/97

07/29/97

0 07/29/97

07/29/97

300

100

805 06 0824 / 7010

1830 S BLUE ISLAND AVE

1.0

11/01/96

11/01/96

0 11/01/96

11/01/96

300

100

805 06 1509 / 7695

2550 S BLUE ISLAND AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1752 / 7938

1602 S CARPENTER ST

1.0

05/23/97

05/23/97

0 05/23/97

05/23/97

300

100

805 06 1508 / 7694

2504 S CLAREMONT AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1687 / 7873

2515 S CLAREMONT AVE

1.0

06/26/97

06/26/97

0 06/26/97

06/26/97

300

100

805 06 1115 / 7301

1940 S DESPLAINES ST

1.0

02/06/97

02/06/97

0 02/06/97

02/06/97

300

100

805 06 1199 / 7385

1948 S DESPLAINES ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 0989 / 7175

2002 S DESPLAINES ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1107 / 7293

2010 S DESPLAINES ST

1.0

02/06/97

02/06/97

0 02/06/97

02/06/97

300

100

805 06 1597 / 7783

1112 S HALSTED ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 2004 / 8190

1820 S LAFLIN ST

1.0

01/03/97

01/03/97

0 01/03/97

01/03/97

600

100

805 06 0354 / 6540

803 S LEAVITT ST

1.0

08/05/96

08/05/96

0 08/05/96

08/05/96

300

100

805 06 1680 / 7866

1621 S LOOMIS ST

1.0

07/29/97

07/29/97

0 07/29/97

07/29/97

300

100

300 06 0139 / 5289

2439 S OAKLEY AVE

1,131.0

03/01/06

09/01/06

24,734 02/15/06

03/15/06

34,172

100

302 00 0092 / 5774

2439 S OAKLEY AVE

53.0

0 02/01/01

01/11/02

12,489

100

805 06 1667 / 7853

2452 S OAKLEY AVE

1.0

07/14/97

07/14/97

0 07/14/97

07/14/97

300

100

805 06 0542 / 6728

1800 S PEORIA ST

1.0

01/03/95

01/03/95

0 01/03/95

01/03/95

300

100

805 06 1686 / 7872

2317 S SEELEY AVE

1.0

06/26/97

06/26/97

0 06/26/97

06/26/97

300

100

805 06 1507 / 7693

2425 S WESTERN AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1504 / 7690

2323 S WOLCOTT AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 0464 / 6650

2326 S WOLCOTT AVE

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1505 / 7691

2326 S WOLCOTT AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 0967 / 7153

639 W 18TH ST

1.0

02/06/97

02/06/97

0 02/06/97

02/06/97

300

100

805 06 0968 / 7154

1689 W 18TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 0969 / 7155

1701 W 18TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1204 / 7390

1701 W 18TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1789 / 7975

1701 W 18TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 0972 / 7158

2000 W 18TH ST

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 258

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0973 / 7159

1700 W 19TH ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 0956 / 7142

1702 W 19TH ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 0975 / 7161

1714 W 19TH ST

1.0

12/01/95

12/01/95

0 12/01/95

12/01/95

300

100

805 06 0965 / 7151

1758 W 19TH ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 0949 / 7135

1800 W 21ST PL

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 0947 / 7133

1756 W 21ST ST

1.0

02/06/97

02/06/97

0 02/06/97

02/06/97

300

100

805 06 0948 / 7134

1902 W 21ST ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1501 / 7687

1808 W 22ND PL

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1502 / 7688

1820 W 22ND PL

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

300 06 0122 / 5275

2308 W 22ND PL

16.0

05/06/03

05/09/03

5,600 05/06/03

05/06/03

2,735

100

805 06 0950 / 7136

1900 W 23RD ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 0951 / 7137

2326 W 23RD ST

1.0

04/29/96

04/29/96

0 04/29/96

04/29/96

300

100

805 06 1503 / 7689

2314 W 25TH ST

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1568 / 7754

2327 W 25TH ST

1.0

10/01/97

10/01/97

0 10/01/97

10/01/97

300

100

805 06 1506 / 7692

2336 W 25TH ST

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1205 / 7391

200 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1791 / 7977

200 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 2067 / 8253

200 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 2056 / 8242

1630 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 2048 / 8234

1922 W CERMAK RD

1.0

10/26/95

10/26/95

0 10/26/95

10/26/95

300

100

805 06 1892 / 8078

2000 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 2040 / 8226

2004 W CERMAK RD

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1766 / 7952

1700 W CULLERTON ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1747 / 7933

1703 W CULLERTON ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1728 / 7914

1800 W CULLERTON ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1739 / 7925

1801 W CULLERTON ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1720 / 7906

2003 W CULLERTON ST

1.0

01/14/97

01/14/97

0 01/14/97

01/14/97

300

100

805 06 1598 / 7784

1210 W LEXINGTON ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 0530 / 6716

1057 W POLK ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

Totals per Alley Lighting/Lamps

1,257.0

30,334

66,796

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 259

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

2439 S OAKLEY AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2439 S OAKLEY AVE

Work Type: Flood Light Install

Lamps 2,584.0

06/01/07

12/31/07

76,072 09/01/07

09/15/07

73,773

100

0 06/09/02

06/12/02

45,320

100

4,000 08/25/08

08/26/08

3,280

100

0 05/14/01

05/14/01

471

100

Installations 2,489.0

Fixtures

300 09 / 33091

ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST

8.0

302 00 0092 / 5774

2700 S WESTERN AVE

1.0

300 09 / 33091

1845 W 22ND PL

1.0

10/01/08

10/01/08

500 10/01/08

10/01/08

0

100

300 06 0122 / 5275

2308 W 22ND PL

3.0

05/09/03

05/09/03

2,425 05/06/03

05/06/03

965

100

300 09 / 33091

200 W CERMAK RD

1.0

10/01/08

10/01/08

500 10/01/08

10/01/08

0

100

300 06 0122 / 5275

1400 W FLOURNOY ST

3.0

01/15/03

01/22/03

1,455 01/15/03

01/19/03

970

100

300 06 0167 / 5306

2200 W OGDEN AVE

9.0

0 11/11/99

11/11/99

1,504

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 302 00 0094 / 5776

ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE

Work Type: Lighting Imprvmnts

02/01/08

12/31/08

26.0

8,880

7,190

Blocks 3.0

0 03/08/98

08/01/99

565,355

100

Installations

300 06 0292 / 5399

2432 S BLUE ISLAND AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

99

300 06 0292 / 5399

open til further notice Note Last Updated on 01-NOV-07 2437 S DAMEN AVE

.0

09/30/05

10/30/05

14,306 09/29/05

11/29/05

10,993

100

300 06 0292 / 5399

837 S WESTERN AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts 300 06 0199 / 5324

2451 S ASHLAND AVE

300 06 0282 / 5390

1650 S BLUE ISLAND AVE

Totals per Lighting Imprvmnts

.0

14,306

10,993

Projects 1.0 .0 1.0

72,350 10/06/04

10/31/04

4,000 09/14/04 76,350

12/15/04

72,318

100

0

100

72,318

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 260

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 09 / 33091

ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST

300 09 / 33091

ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST

300 03 0025 / 4896

Fixtures 6.0

11/05/08

11/13/08

8,100 11/05/08

11/07/08

6,930

100

22.0

09/22/08

10/17/08

29,700 10/06/08

10/16/08

25,410

100

ON W 18TH ST FROM S DAMEN AVE TO S MORGAN ST

110.0

08/01/04

08/18/04

148,500 08/13/04

09/13/04

124,826

100

300 09 / 33091

ON W 18TH ST FROM S DAMEN AVE TO S OAKLEY AVE

43.0

01/12/09

01/30/09

58,050 01/12/09

01/30/09

49,605

100

300 09 / 33091

ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE

15.0

10/21/08

10/30/08

20,250 10/21/08

10/30/08

17,325

100

300 06 0122 / 5275

ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE

4.0

10/25/03

10/25/03

4,800 11/05/03

11/05/03

4,944

100

300 06 0122 / 5275

ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE

5.0

10/25/03

10/25/03

6,000 11/05/03

11/05/03

6,179

100

300 06 0122 / 5275

ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE

4.0

10/25/03

10/25/03

4,800 11/05/03

11/05/03

4,944

100

300 06 0122 / 5275

ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE

4.0

10/25/03

10/25/03

4,800 11/05/03

11/05/03

4,944

100

300 09 / 33091

ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST

11.0

02/01/08

12/31/08

14,850 10/01/08

10/06/08

12,705

100

300 09 / 33068

ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE

2.0

10/20/08

10/24/08

2,700 10/09/08

10/16/08

2,864

100

300 09 / 33091

ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST

12.0

02/01/08

12/31/08

16,200 10/06/08

10/16/08

13,860

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 300 09 / 33091

ON S SANGAMON ST FROM W 18TH ST TO W CULLERTON ST

Work Type: Residential Regrouping 300 06 0270 / 5378

2439 S OAKLEY AVE

Work Type: Residntl Staggered Lighting

238.0

318,750

274,536

240,000

0

0

0

0

0

Blocks 2.0

Lamps .0

03/01/08

12/01/08

Blocks

300 06 0308 / 5414

ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST

1.0

06/09/06

08/07/06

53,753 06/09/06

08/07/06

40,195

100

300 06 0298 / 5405

ON S LEAVITT ST FROM W POLK ST TO W TAYLOR ST

2.0

07/15/05

09/01/05

0 07/15/05

09/07/05

94,230

100

300 06 0308 / 5414

ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD

1.0

06/09/06

08/07/06

53,753 06/09/06

08/07/06

40,195

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

4.0

107,506

174,620

Blocks

300 06 0235 / 5349

ON S CLAREMONT AVE FROM W POLK ST TO W TAYLOR ST

2.0

05/30/03

07/30/03

95,892 05/22/03

07/14/03

92,774

100

300 06 0122 / 5275

ON S OAKLEY AVE FROM W POLK ST TO W TAYLOR ST

2.0

02/15/03

02/28/03

6,300 02/10/03

02/21/03

6,300

100

300 06 0267 / 5375

ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE

2.0

10/15/04

12/15/04

150,000 10/06/04

01/21/05

170,704

100

Totals per Residntl Strt Lighting/Lamps

6.0

252,192

269,778

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 261

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

2259 W 23RD PL

Locations 1.0

0 03/23/01

03/23/01

378

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 262

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 05 0025 / 5140

ON S CARPENTER ST FROM W 21ST ST TO W CULLERTON ST

302 00 0077 / 5765

ON S CLARK ST FROM W 17TH ST TO W 18TH ST

300 05 0025 / 5140

ON S DAMEN AVE FROM W 19TH ST TO W 18TH ST

300 09 / 33068

ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE

300 09 / 33091

ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST

300 09 / 33068

ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST

300 05 0025 / 5140

ON S MAY ST FROM W CULLERTON ST TO W CERMAK RD

300 11 / 32214

Locations 4.0

04/04/05

11/18/05

9.50

800 11/10/05

11/20/05

829

100

0 11/11/99

11/12/99

830

100

6.0

04/04/05

11/18/05

1,200 11/10/05

11/20/05

1,244

100

2.80

06/02/08

06/20/08

560 06/02/08

06/13/08

588

100

6.0

10/22/08

10/23/08

1,800 10/22/08

10/23/08

1,260

100

2.59

06/02/08

06/13/08

777 06/02/08

06/13/08

544

100

8.0

04/04/05

11/18/05

1,600 11/10/05

11/20/05

1,659

100

ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST

22.0

11/01/07

11/07/07

4,840 10/25/07

10/25/07

4,400

100

300 05 0025 / 5140

ON S PRINCETON AVE FROM W 24TH ST TO W CERMAK RD

13.0

04/04/05

11/18/05

3,250 11/10/05

11/20/05

2,697

100

300 05 0025 / 5140

ON S STEWART AVE FROM W 23RD PL TO W 24TH PL

4.0

04/04/05

11/18/05

800 11/10/05

11/20/05

830

100

300 05 0025 / 5140

ON S WENTWORTH AVE FROM W 24TH ST TO W 24TH PL

2.0

04/04/05

11/18/05

400 11/10/05

11/20/05

415

100

300 09 / 33068

ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST

3.60

06/02/08

06/20/08

720 06/05/08

07/09/08

756

100

300 05 0025 / 5140

ON S WOOD ST FROM W 18TH ST TO W 19TH ST

6.0

04/04/05

11/18/05

1,200 11/10/05

11/20/05

1,245

100

300 03 0025 / 4896

ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST

172.0

05/01/04

05/10/04

40,320 05/01/04

06/01/04

40,376

100

300 05 0025 / 5140

ON W 19TH ST FROM S WOOD ST TO S DAMEN AVE

11.0

04/04/05

11/18/05

2,200 11/10/05

11/20/05

2,282

100

300 09 / 33091

ON W 21ST PL FROM S DAMEN AVE TO S OAKLEY AVE

15.0

09/22/08

09/26/08

4,500 09/22/08

09/26/08

3,150

100

300 05 0025 / 5140

ON W 22ND PL FROM S WENTWORTH AVE TO S PRINCETON AVE

6.0

04/04/05

11/18/05

1,200 11/10/05

11/20/05

830

100

300 06 0108 / 5263

ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE

4.0

09/10/03

09/20/03

1,000 09/05/03

09/07/03

560

100

300 05 0025 / 5140

ON W 23RD PL FROM S WENTWORTH AVE TO S PRINCETON AVE

5.0

04/04/05

11/18/05

1,000 11/10/05

11/20/05

1,037

100

300 06 0108 / 5263

ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE

5.0

09/10/03

09/20/03

1,250 09/05/03

09/07/03

560

100

300 05 0025 / 5140

ON W 23RD ST FROM S WENTWORTH AVE TO S PRINCETON AVE

5.0

04/04/05

11/18/05

1,000 11/10/05

11/20/05

1,037

100

300 06 0108 / 5263

ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE

4.0

09/10/03

09/20/03

1,000 09/05/03

09/07/03

560

100

300 05 0025 / 5140

ON W 24TH PL FROM S WENTWORTH AVE TO S PRINCETON AVE

6.0

04/04/05

11/18/05

1,200 11/10/05

11/20/05

1,245

100

300 06 0108 / 5263

ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE

4.0

09/10/03

09/20/03

1,000 09/05/03

09/07/03

560

100

300 05 0025 / 5140

ON W 24TH ST FROM S WENTWORTH AVE TO S PRINCETON AVE

5.0

04/04/05

11/18/05

1,000 11/10/05

11/20/05

1,037

100

300 05 0025 / 5140

ON W ALEXANDER ST FROM S WENTWORTH AVE TO S PRINCETON AVE

6.0

04/04/05

11/18/05

1,200 11/10/05

11/20/05

1,244

100

300 04 0216 / 5114

ON W CERMAK RD FROM S OAKLEY AVE TO S HOYNE AVE

33.0

05/01/06

11/01/06

7,066 05/17/06

07/12/06

7,066

100

300 09 / 33091

ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST

11.0

02/01/08

12/31/08

3,300 09/22/08

09/24/08

2,350

100

300 05 0025 / 5140

ON W CULLERTON ST FROM S CARPENTER ST TO S MAY ST

4.0

04/04/05

11/18/05

800 11/10/05

11/20/05

830

100

300 09 / 33091

ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST

10.0

02/01/08

12/31/08

1,600 08/25/08

08/26/08

1,008

100

300 11 / 32191

ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST

17.0

11/14/08

12/15/08

3,400 11/14/08

12/15/08

3,400

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 263

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 09 / 33068

S LAFLIN ST AND W TAYLOR ST

1.0

302 00 0077 / 5765

2100 W OGDEN AVE

6.0

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

06/02/08

06/13/08

419.49

300 06/05/08

06/10/08

210

100

0 08/25/99

08/25/99

524

100

92,283

87,163

Blocks

300 03 0025 / 4896

ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE

10/01/04

11/01/04

65,000 10/06/04

01/21/05

27,803

100

300 06 0084 / 5246

2000-2100 S CLARK ST

09/01/98

01/31/99

221,000 10/01/98

02/28/99

233,215

100

303 00 0006 / 5783

2400 W 21ST ST

08/01/97

12/01/97

60,000 08/01/97

04/30/98

76,549

100

346,000

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

2439 S OAKLEY AVE

337,567

Lamps 1,775.0

03/01/04

12/01/04

9,230 09/22/06

09/26/06

19,330

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 264

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2444 / 8630

1820 N HOYNE AVE

10.0

09/11/95

09/11/95

0 09/11/95

09/11/95

7,500

100

805 06 2667 / 8853

1819 N LEAVITT ST

10.0

11/25/94

11/25/94

0 11/25/94

11/25/94

7,500

100

805 06 2329 / 8515

2290 S ARCHER AVE

31.0

05/15/96

05/15/96

0 05/15/96

05/15/96

23,250

100

805 06 2159 / 8345

1583 S BLUE ISLAND AVE

20.0

05/21/97

05/21/97

0 05/21/97

05/21/97

15,000

100

805 06 2186 / 8372

1583 S BLUE ISLAND AVE

50.0

05/21/97

05/21/97

0 05/21/97

05/21/97

37,500

100

302 00 0071 / 5759

2200 S CANAL ST

0 10/08/98

10/14/98

12,802

100

805 06 2658 / 8844

2205 S CANAL ST

14.0

10/01/91

10/01/91

0 10/01/91

10/01/91

10,500

100

805 06 2838 / 9024

1602 S CLARK ST

3.0

12/09/93

12/09/93

0 12/09/93

12/09/93

2,250

100

805 06 2559 / 8745

1695 S DAMEN AVE

200.0

11/13/94

11/13/94

0 11/13/94

11/13/94

150,000

100

805 06 2564 / 8750

1695 S DAMEN AVE

200.0

11/13/94

11/13/94

0 11/13/94

11/13/94

150,000

100

805 06 2584 / 8770

1698 S DAMEN AVE

200.0

11/13/94

11/13/94

0 11/13/94

11/13/94

150,000

100

805 06 2560 / 8746

1699 S DAMEN AVE

200.0

11/13/94

11/13/94

0 11/13/94

11/13/94

150,000

100

805 06 2685 / 8871

1501 S HALSTED ST

18.0

03/11/91

03/11/91

0 03/11/91

03/11/91

13,500

100

805 06 2951 / 9137

1465 S MORGAN ST

44.0

04/04/94

04/04/94

0 04/04/94

04/04/94

33,000

100

805 06 2967 / 9153

1580 S MORGAN ST

20.0

04/04/94

04/04/94

0 04/04/94

04/04/94

15,000

100

805 06 2691 / 8877

1599 S NEWBERRY AVE

38.0

06/06/94

06/06/94

0 06/06/94

06/06/94

28,500

100

805 06 2787 / 8973

2341 S NORMAL AVE

6.0

10/30/91

10/30/91

0 10/30/91

10/30/91

4,500

100

805 06 2846 / 9032

2345 S NORMAL AVE

18.0

10/01/91

10/01/91

0 10/01/91

10/01/91

13,500

100

300 06 0217 / 5337

2439 S OAKLEY AVE

566.0

12/26/03

01/03/04

31,814 12/22/03

12/29/03

20,331

100

805 06 2379 / 8565

1501 S PEORIA ST

18.0

01/10/96

01/10/96

0 01/10/96

01/10/96

13,500

100

805 06 2380 / 8566

1597 S PEORIA ST

50.0

03/01/96

03/01/96

0 03/01/96

03/01/96

37,500

100

805 06 2920 / 9106

1505 S RACINE AVE

20.0

03/18/94

03/18/94

0 03/18/94

03/18/94

15,000

100

805 06 2935 / 9121

1590 S RACINE AVE

42.0

03/18/94

03/18/94

0 03/18/94

03/18/94

31,500

100

805 06 2540 / 8726

1501 S SANGAMON ST

22.0

06/06/95

06/06/95

0 06/06/95

06/06/95

16,500

100

805 06 2539 / 8725

1590 S SANGAMON ST

42.0

06/06/95

06/06/95

0 06/06/95

06/06/95

31,500

100

805 06 2179 / 8365

1505 S UNION AVE

40.0

04/15/97

04/15/97

0 04/15/97

04/15/97

30,000

100

302 00 0070 / 5758

1520 S UNION AVE

0 04/04/97

04/15/97

14,507

100

302 00 0070 / 5758

1540 S UNION AVE

0 06/03/97

06/19/97

16,179

100

805 06 2158 / 8344

1562 S UNION AVE

46.0

06/19/97

06/19/97

0 06/19/97

06/19/97

34,500

100

805 06 2784 / 8970

1305 S WESTERN AVE

18.0

07/11/94

07/11/94

0 07/11/94

07/11/94

13,500

100

805 06 2783 / 8969

2400 S WESTERN AVE

30.0

05/23/94

05/23/94

0 05/23/94

05/23/94

22,500

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 265

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2782 / 8968

2405 S WESTERN AVE

34.0

06/06/94

06/06/94

0 06/06/94

06/06/94

25,500

100

805 06 2905 / 9091

999 W 16TH ST

10.0

12/19/93

12/19/93

0 12/19/93

12/19/93

7,500

100

805 06 2496 / 8682

410 W 23RD ST

51.0

09/25/95

09/25/95

0 09/25/95

09/25/95

38,250

100

805 06 2717 / 8903

2405 W 23RD ST

38.0

05/10/94

05/10/94

0 05/10/94

05/10/94

28,500

100

805 06 2338 / 8524

401 W 24TH ST

82.0

05/24/96

05/24/96

0 05/24/96

05/24/96

61,500

100

805 06 2952 / 9138

2440 W 26TH ST

12.0

03/20/94

03/20/94

0 03/20/94

03/20/94

9,000

100

805 06 2824 / 9010

121 W CERMAK RD

18.0

03/13/91

03/13/91

0 03/13/91

03/13/91

13,500

100

805 06 2328 / 8514

301 W CERMAK RD

22.0

01/01/91

01/01/91

0 01/01/91

01/01/91

16,500

100

302 00 0070 / 5758

400 W CERMAK RD

0 11/21/97

11/28/97

18,298

100

805 06 2129 / 8315

400 W CERMAK RD

0 11/28/97

11/28/97

25,500

100

302 00 0070 / 5758

430 W CERMAK RD

0 12/10/97

12/17/97

4,012

100

805 06 2130 / 8316

430 W CERMAK RD

26.0

12/17/97

12/17/97

0 12/17/97

12/17/97

19,500

100

805 06 2693 / 8879

499 W CERMAK RD

26.0

01/01/91

01/01/91

0 01/01/91

01/01/91

19,500

100

805 06 2718 / 8904

2405 W CERMAK RD

28.0

08/03/91

08/03/91

0 08/03/91

08/03/91

21,000

100

Totals per Underpass Lighting

34.0

2,357.0

11/28/97

11/28/97

31,814

1,429,379

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 266

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

S CLARK ST AND S ARCHER AVE

.50

0 09/10/01

09/10/01

4,472

100

210 06 0130 / 4389

S HALSTED ST AND S CANALPORT AVE

1.0

0 07/18/02

07/18/02

1,850

100

210 06 0130 / 4389

S HALSTED ST AND W 16TH ST

1.0

0 01/18/02

01/18/02

1,850

100

210 06 0219 / 4459

S WESTERN AVE AND S BLUE ISLAND AVE

1.0

05/05/05

05/06/05

10,563 03/18/05

03/18/05

9,406

100

210 06 0219 / 4459

S WESTERN AVE AND W 16TH ST

.50

03/10/05

03/11/05

5,282 04/28/05

04/28/05

4,004

100

210 06 0219 / 4459

S WESTERN AVE AND W 21ST ST

1.0

03/08/05

03/09/05

10,563 04/26/05

04/26/05

8,008

100

210 06 0219 / 4459

S WESTERN AVE AND W CERMAK RD

1.0

04/27/05

04/27/05

10,563 04/22/05

04/22/05

8,527

100

210 06 0219 / 4459

S WESTERN AVE AND W ROOSEVELT RD

.50

03/14/05

03/15/05

5,282 03/28/05

03/28/05

4,783

100

210 06 0130 / 4389

S WOLCOTT AVE AND S BLUE ISLAND AVE

1.0

0 09/16/02

09/16/02

9,306

100

210 06 0219 / 4459

W 23RD PL AND S WESTERN AVE

1.0

10,563 04/25/05

04/25/05

6,468

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 300 06 0225 / 5340

S LOOMIS ST AND W CERMAK RD

05/04/05

05/05/05

8.50

52,815

58,673

Locations 1.0

03/15/04

04/01/04

8,300 11/17/03

11/17/03

6,281

100

Work Type: Removal Temp Wiring - Signals

Crossings

300 06 0197 / 5322

W 14TH ST AND S BLUE ISLAND AVE

.50

2,000 09/11/01

09/12/01

1,328

100

300 06 0197 / 5322

W 21ST ST AND S WESTERN AVE

3.0

12,000 06/19/01

06/27/01

9,977

100

300 06 0197 / 5322

W CERMAK RD AND S LEAVITT ST

3.0

12,000 06/26/01

07/02/01

2,991

100

300 06 0197 / 5322

2190 W TAYLOR ST

1.0

8,000 11/13/01

11/13/01

10,685

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

2439 S OAKLEY AVE

7.50

34,000

24,981

Intersections 50.0

07/10/03

07/15/03

0 07/08/03 182,269

07/08/03

7,906 610,080

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 267

1/1/2008 AND 12/31/2008

Ward 25 Daniel S. Solis CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0020 / 4295

S BLUE ISLAND AVE AND W 16TH ST

05/18/00

07/15/00

82,500 05/18/00

09/25/00

95,886

100

814 06 0181 / 16393

339 E CERMAK RD

1.0

10/24/95

10/24/95

0 10/24/95

10/24/95

125,000

100

814 06 0327 / 16531

1726 N LA SALLE ST

1.0

01/01/96

01/01/96

0 01/01/96

04/15/97

5,500

100

814 06 0238 / 16450

2800 N WESTERN AVE

1.0

01/01/91

01/01/91

0 01/01/91

01/01/91

100,000

100

814 06 0233 / 16445

2451 S ASHLAND AVE

1.0

07/23/92

07/23/92

0 07/23/92

07/23/92

105,000

100

814 06 0347 / 16545

950 W ROOSEVELT RD

1.0

09/22/96

09/22/96

0 09/22/96

09/22/96

77,534

100

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

82,500

508,920

Locations

300 09 / 33091

ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST

1.0

10/22/08

10/23/08

200 10/22/08

10/23/08

84

100

300 09 / 33068

ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST

.95

06/02/08

06/20/08

264 04/01/08

12/01/08

0

100

300 11 / 32191

W HARRISON ST AND S MORGAN ST

1.0

11/14/08

12/16/08

1,250 11/14/08

12/16/08

910

100

300 11 / 32191

W HARRISON ST AND S RACINE AVE

1.0

11/14/08

12/16/08

2,940 11/14/08

12/16/08

2,325

100

3.95

4,654

3,319

Totals per Construction Phase

1,943,639

4,151,002

Totals for Ward 25

1,973,639

4,171,458

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 268

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32146

ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

1.0

11/01/07

11/30/07

0

0

0

300 06 / 32146

ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD

1.0

10/01/07

10/31/07

0

0

100

300 06 0308 / 5414

ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD

.0

02/01/06

07/31/06

300 06 0292 / 5399

1154 N CAMPBELL AVE

1.0

300 06 0292 / 5399

3227 W NORTH AVE

1.0

Totals per Design/Engineering

4.0

03/15/05

03/31/05

0 02/01/06

07/31/06

2,082

100

2,000 02/22/05

03/02/05

0

100

1,000 03/15/05

03/31/05

0

100

3,000

2,082

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 269

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233

ON N CHRISTIANA AVE FROM W GRAND AVE TO W DIVISION ST

300 11 / 32215

ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 07 0026 / 5449

ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 06 0069 / 5233

ON N HOMAN AVE FROM W GRAND AVE TO W DIVISION ST

300 06 0069 / 5233

ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE

300 07 0026 / 5449

Fixtures 8.0

01/25/03

01/25/03

.0

03/01/07

12/31/07

7.0

01/10/07

01/31/07

2,900 01/04/07

3,200 01/22/03

01/22/03

0

1,832

100

0

0

01/04/07

2,900

100

8.0

01/25/03

01/25/03

3,200 01/22/03

01/22/03

2,748

100

4.50

01/31/03

01/31/03

1,688 01/30/03

01/30/03

1,262

100

ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD

7.0

01/10/07

01/31/07

2,900 01/04/07

01/04/07

2,900

100

300 07 0026 / 5449

ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE

4.0

01/10/07

01/31/07

1,600 01/04/07

01/04/07

1,600

100

300 06 0069 / 5233

ON N SPAULDING AVE FROM W GRAND AVE TO W DIVISION ST

8.0

01/25/03

01/25/03

2,800 01/22/03

01/22/03

2,625

100

300 06 0069 / 5233

ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE

2.64

10/01/03

10/16/03

0 02/04/02

02/04/02

990

100

300 09 / 33067

ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE

3.50

06/16/08

06/20/08

1,400 06/16/08

06/20/08

879

100

300 11 / 32215

Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE

.0

03/01/07

12/31/07

0

0

300 06 0069 / 5233

1500 N KEDZIE AVE

1.0

01/19/03

01/19/03

210 01/16/03

01/16/03

203

100

302 00 0092 / 5774

1500 N ROCKWELL AVE

2.0

01/18/02

01/18/02

425 01/16/02

01/16/02

406

100

302 00 0092 / 5774

1500 N ROCKWELL AVE

1.0

0 01/16/02

01/16/02

203

100

300 06 0069 / 5233

1257 N ROCKWELL ST

1.0

10/24/02

10/24/02

210 10/21/02

10/21/02

203

100

302 00 0092 / 5774

2100 N SPAULDING AVE

1.0

10/02/01

10/02/01

205 10/04/01

10/04/01

205

100

300 11 / 32215

3300 W BLOOMINGDALE AVE

5.0

08/01/07

08/10/07

2,200 08/18/07

08/18/07

2,200

100

300 11 / 32215

3236 W DIVISION ST

.0

03/01/07

12/31/07

302 00 0092 / 5774

3400 W PALMER ST

3.0

02/07/02

02/07/02

630 02/04/02

300 06 0069 / 5233

3400-3499 W PALMER ST

3.0

300 06 0069 / 5233

2601 W POTOMAC AVE

1.0

10/24/02

10/24/02

300 11 / 32190

2601 W POTOMAC AVE

.0

03/01/07

12/31/07

Totals per 250 Watt Changeout Totals per Lighting/Electrical

70.64

0

0

0

0

02/04/02

609

100

0 02/04/02

02/04/02

1,125

100

210 10/21/02

10/21/02

203

100

0

0

0

23,778

23,092

2,076,617

1,004,711

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 270

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0794 / 6980

2300 N ALBANY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0795 / 6981

2324 N ALBANY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0882 / 7068

2525 N BERNARD ST

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 0804 / 6990

817 N CALIFORNIA AVE

1.0

10/04/96

10/04/96

0 10/04/96

10/04/96

300

100

302 00 0092 / 5774

1223 N CALIFORNIA AVE

1.0

0 11/05/01

11/05/01

236

100

302 00 0092 / 5774

1247 N CALIFORNIA AVE

1.0

0 11/05/01

11/05/01

236

100

302 00 0092 / 5774

1457 N CALIFORNIA AVE

1.0

0 11/06/01

11/06/01

236

100

302 00 0092 / 5774

1400 N CAMPBELL AVE

1.0

0 07/19/01

07/19/01

236

100

805 06 0813 / 6999

2415 N CENTRAL PARK AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0816 / 7002

2445 N CENTRAL PARK AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0817 / 7003

2517 N CENTRAL PARK AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0769 / 6955

2525 N CENTRAL PARK AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 1000 / 7186

2545 N CENTRAL PARK AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0514 / 6700

2433 N DRAKE AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 1096 / 7282

2436 N DRAKE AVE

1.0

04/17/96

04/17/96

0 04/17/96

04/17/96

300

100

805 06 1069 / 7255

2457 N DRAKE AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0970 / 7156

2525 N DRAKE AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

805 06 0841 / 7027

2542 N DRAKE AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

805 06 1095 / 7281

2041 N HAMLIN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1218 / 7404

1600 N HUMBOLDT BLVD

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 1715 / 7901

1618 N KEDZIE AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1716 / 7902

1623 N KEDZIE AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1724 / 7910

1729 N KIMBALL AVE

1.0

06/20/97

06/20/97

0 06/20/97

06/20/97

300

100

805 06 1718 / 7904

1733 N KIMBALL AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 2014 / 8200

2116 N KIMBALL AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 2015 / 8201

2156 N KIMBALL AVE

1.0

07/12/96

07/12/96

0 07/12/96

07/12/96

300

100

302 00 0092 / 5774

1505 N MAPLEWOOD AVE

1.0

0 11/05/01

11/05/01

236

100

302 00 0092 / 5774

1516 N ROCKWELL AVE

1.0

0 11/05/01

11/05/01

236

100

805 06 1695 / 7881

1500 N ROCKWELL ST

1.0

0 07/07/97

07/07/97

300

100

302 00 0092 / 5774

854 N SACRAMENTO AVE

1.0

0 07/24/01

07/24/01

236

100

302 00 0092 / 5774

933 N SACRAMENTO AVE

1.0

0 12/10/01

12/10/01

236

100

07/07/97

07/07/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 271

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0690 / 6876

854 N SACRAMENTO BLVD

1.0

04/20/96

04/20/96

0 04/20/96

04/20/96

300

100

805 06 1719 / 7905

1830 N SAWYER AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1721 / 7907

1837 N SAWYER AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1722 / 7908

1850 N SAWYER AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 0408 / 6594

1940 N ST LOUIS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0409 / 6595

2403 N ST LOUIS AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0394 / 6580

2435 N ST LOUIS AVE

1.0

07/17/96

07/17/96

0 07/17/96

07/17/96

300

100

805 06 0411 / 6597

2457 N ST LOUIS AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0432 / 6618

2523 N ST LOUIS AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 0413 / 6599

2541 N ST LOUIS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 0414 / 6600

2559 N ST LOUIS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

302 00 0092 / 5774

2735 W AUGUSTA BLVD

1.0

0 10/19/01

10/19/01

236

100

805 06 1051 / 7237

3401 W DICKENS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 1062 / 7248

3402 W DICKENS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 1043 / 7229

3433 W DICKENS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 1024 / 7210

3533 W DICKENS AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

300 06 0139 / 5289

3236 W DIVISION ST

1,179.0

03/01/06

09/01/06

25,774 06/15/06

06/30/06

35,622

100

302 00 0092 / 5774

3236 W DIVISION ST

19.0

0 01/19/01

01/16/02

4,477

100

805 06 1678 / 7864

3115 W FULLERTON AVE

1.0

07/28/97

07/28/97

0 07/28/97

07/28/97

300

100

805 06 1751 / 7937

3153 W FULLERTON AVE

1.0

05/22/97

05/22/97

0 05/22/97

05/22/97

300

100

302 00 0092 / 5774

2519 W HADDON AVE

1.0

0 07/12/01

07/12/01

236

100

805 06 1154 / 7340

2602 W HADDON AVE

1.0

08/01/96

08/01/96

0 08/01/96

08/01/96

300

100

805 06 1691 / 7877

3710 W LE MOYNE ST

1.0

07/02/97

07/02/97

0 07/02/97

07/02/97

300

100

805 06 1692 / 7878

3722 W LE MOYNE ST

1.0

07/02/97

07/02/97

0 07/02/97

07/02/97

300

100

805 06 1694 / 7880

3741 W LE MOYNE ST

1.0

07/02/97

07/02/97

0 07/02/97

07/02/97

300

100

805 06 1837 / 8023

3503 W MC LEAN AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 1912 / 8098

2617 W NORTH AVE

1.0

10/18/95

10/18/95

0 10/18/95

10/18/95

300

100

805 06 1913 / 8099

2619 W NORTH AVE

1.0

10/18/95

10/18/95

0 10/18/95

10/18/95

300

100

302 00 0092 / 5774

1507 W OHIO ST

1.0

0 10/19/01

10/19/01

236

100

805 06 1712 / 7898

2101 W OHIO ST

1.0

06/18/97

06/18/97

0 06/18/97

06/18/97

300

100

805 06 0605 / 6791

3325 W PALMER ST

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 272

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0627 / 6813

3640 W PALMER ST

1.0

04/08/96

04/08/96

0 04/08/96

04/08/96

300

100

805 06 0624 / 6810

3435 W SHAKESPEARE AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 0645 / 6831

3533 W SHAKESPEARE AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 0399 / 6585

3248 W WABANSIA AVE

1.0

07/17/96

07/17/96

0 07/17/96

07/17/96

300

100

805 06 0466 / 6652

3503 W WRIGHTWOOD AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

805 06 0487 / 6673

3525 W WRIGHTWOOD AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

3236 W DIVISION ST

Work Type: Arterial Strt Lighting/Lamps 300 11 / 32190

2601 W POTOMAC AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

3236 W DIVISION ST

Work Type: Flood Light Install 300 06 0167 / 5306

824 N FAIRFIELD AVE

Work Type: Lighting Imprvmnts 300 06 0078 / 5241

3200 W PALMER ST

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

3227 W NORTH AVE

Work Type: Ornamental Lighting 300 11 / 32215

3236 W DIVISION ST

300 11 / 32190

2601 W POTOMAC AVE

Totals per Ornamental Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

3236 W DIVISION ST

1,264.0

25,774

59,195

Lamps 1,342.0

06/01/07

12/31/07

03/01/07

12/31/07

39,508 07/10/07

01/05/08

39,508

100

0

0

Blocks .0

0

Installations 1,247.0

0 05/18/02

05/21/02

22,706

100

0 12/09/99

12/09/99

188

100

Fixtures 2.0

Blocks 1.0

04/01/98

12/01/98

26,500 04/15/98

03/20/01

1,415

100

03/01/05

12/31/05

0 05/06/05

07/06/05

0

100

1.0

03/01/07

12/31/07

33,000

0

0

.0

03/01/07

12/31/07

0

0

0

33,000

0

0

0

Installations .0

Blocks

1.0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 273

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33092

ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

0

0

300 11 / 32215

ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

03/01/07

12/31/07

110,000

0

0

300 06 / 32146

ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

03/28/08

06/30/08

305,644

0

0

300 11 / 32219

Mozart from Augusta to Chicago is also under the same estimate Note Last Updated on 04-MAR-08 ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE 1.0 04/16/07

08/15/07

62,500 04/09/07

09/07/07

50,000

100

300 06 0298 / 5405

ON N MAPLEWOOD AVE FROM W DIVISION ST TO W HIRSCH ST

2.0

10/15/05

11/25/05

0 10/03/05

11/30/05

109,552

100

300 07 0026 / 5449

ON N MONTICELLO AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

04/18/06

11/18/06

170,000 01/03/07

05/04/07

133,415

100

300 06 / 32146

ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

12/05/07

06/23/08

305,644

0

0

300 06 0308 / 5414

Same project as Francisco Ave Note Last Updated on 04-MAR-08 ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD

2.0

03/16/06

12/31/06

160,406 09/20/06

37,328

100

300 09 / 33092

ON N ROCKWELL ST FROM W CHICAGO AVE TO W GRAND AVE

4.0

0

0

300 09 / 33092

ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE

2.0

0

0

300 11 / 32215

ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE

2.0

03/01/07

12/31/07

110,000

0

0

300 11 / 32215

3236 W DIVISION ST

.0

03/01/07

12/31/07

0

0

0

300 11 / 32190

2601 W POTOMAC AVE

.0

03/01/07

12/31/07

0

0

0

1,524,194

330,295

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

130,000 04/01/08

12/01/08

04/20/07

40,000 130,000 04/01/08

25.0

12/01/08

Blocks

300 06 0232 / 5346

ON N MONTICELLO AVE FROM W NORTH AVE TO W WABANSIA AVE

2.0

11/04/02

01/03/03

132,000 11/06/02

12/27/02

116,966

100

300 06 0235 / 5349

ON W CRYSTAL ST FROM N KEDZIE AVE TO N HOMAN AVE

2.0

07/01/03

09/01/03

137,451 06/12/03

08/22/03

131,162

100

300 06 0267 / 5375

ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE

1.0

07/20/04

09/20/04

80,185 07/12/04

10/15/04

90,227

100

Totals per Residntl Strt Lighting/Lamps

5.0

349,636

338,355

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 274

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 11 / 32215

ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 07 0026 / 5449

ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 04 0216 / 5114

ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE

300 07 0026 / 5449

ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 07 0026 / 5449

ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE

302 00 0076 / 5764

ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE

300 04 0216 / 5114

ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST

300 11 / 32215

ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE

302 00 0076 / 5764

ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE

300 11 / 32215 300 11 / 32190

.0

03/01/07

12/31/07

0

0

7.0

04/18/06

11/18/06

1,400 12/01/06

12/11/06

0

100

15.50

05/01/06

11/01/06

2,920 05/17/06

10/30/06

2,920

100

7.0

04/18/06

11/18/06

1,400 12/01/06

12/11/06

0

100

4.0

04/18/06

11/18/06

800 12/01/06

12/11/06

0

100

50.0

09/01/00

12/31/00

10.50

05/01/06

11/01/06

2,235

100

.0

03/01/07

12/31/07

0

0

0

5.67

09/01/00

12/31/00

0

96

3236 W DIVISION ST

.0

03/01/07

12/31/07

0

0

0

2601 W POTOMAC AVE

.0

03/01/07

12/31/07

0

0

0

8,755

6,101

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 300 06 0078 / 5241

1132 N ROCKWELL ST

Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

Locations

3236 W DIVISION ST

99.67

0

0 2,235 05/17/06

850 07/12/06

Blocks 1.0

04/01/98

12/01/98

6,300 04/13/98

04/23/98

4,685

100

06/01/06

12/31/06

10,000 10/19/06

10/23/06

8,923

100

Lamps 1,716.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 275

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0071 / 5759

1800 N ALBANY AVE

805 06 2770 / 8956

1805 N ALBANY AVE

805 06 2305 / 8491

1800 N CENTRAL PARK AVE

805 06 2750 / 8936

Fixtures 0 10/15/98

10/19/98

5,819

100

5.0

05/01/92

05/01/92

0 05/01/92

05/01/92

3,750

100

10.0

07/15/96

07/15/96

0 07/15/96

07/15/96

7,500

100

1801 N DRAKE AVE

6.0

06/21/94

06/21/94

0 06/21/94

06/21/94

4,500

100

302 00 0072 / 5760

1800 N KIMBALL AVE

1.0

0 03/15/00

04/27/00

23,466

100

805 06 2746 / 8932

1852 N KIMBALL AVE

24.0

01/01/91

01/01/91

0 01/01/91

01/01/91

18,000

100

805 06 2751 / 8937

1898 N MONTICELLO AVE

10.0

06/23/94

06/23/94

0 06/23/94

06/23/94

7,500

100

805 06 2771 / 8957

1801 N SAWYER AVE

6.0

01/01/90

01/01/90

0 01/01/90

01/01/90

4,500

100

805 06 2747 / 8933

1805 N SPAULDING AVE

10.0

06/16/94

06/16/94

0 06/16/94

06/16/94

7,500

100

805 06 2745 / 8931

1798 N ST LOUIS AVE

10.0

06/16/94

06/16/94

0 06/16/94

06/16/94

7,500

100

302 00 0070 / 5758

1800 N WHIPPLE ST

0 09/10/97

09/15/97

4,233

100

805 06 2101 / 8287

1800 N WHIPPLE ST

10.0

09/15/97

09/15/97

0 09/15/97

09/15/97

7,500

100

805 06 2769 / 8955

3000 W BLOOMINGDALE AVE

12.0

08/11/94

08/11/94

0 08/11/94

08/11/94

9,000

100

805 06 2773 / 8959

3200 W BLOOMINGDALE AVE

6.0

06/29/94

06/29/94

0 06/29/94

06/29/94

4,500

100

805 06 2922 / 9108

3405 W DIVISION ST

12.0

02/28/94

02/28/94

0 02/28/94

02/28/94

9,000

100

300 06 0217 / 5337

2009 W GRAND AVE

519.0

01/07/04

01/19/04

29,172 01/05/04

01/15/04

29,480

100

805 06 2653 / 8839

3685 W NORTH AVE

10.0

06/04/93

06/04/93

0 06/04/93

06/04/93

7,500

100

805 06 2652 / 8838

3570 W POTOMAC AVE

12.0

12/02/94

12/02/94

0 12/02/94

12/02/94

9,000

100

Totals per Underpass Lighting

663.0

29,172

170,248

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 276

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N HAMLIN AVE AND W ARMITAGE AVE

1.0

0 09/23/02

09/23/02

1,850

100

210 06 0130 / 4389

N HUMBOLDT BLVD AND W DIVISION ST

1.0

0 12/07/01

12/07/01

8,539

100

210 06 0130 / 4389

N KEDZIE AVE AND W DIVISION ST

1.0

0 12/04/01

12/04/01

8,539

100

210 06 0219 / 4459

N WESTERN AVE AND W DIVISION ST

.50

03/28/05

03/29/05

5,282 03/16/05

03/16/05

5,042

100

210 06 0219 / 4459

N WESTERN AVE AND W POTOMAC AVE

.50

03/29/05

03/30/05

5,282 03/08/05

03/08/05

3,824

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0029 / 4303

2400 N KIMBALL AVE

Work Type: New Signal 300 11 / 32190

2601 W POTOMAC AVE

Work Type: Removal Temp Wiring - Signals

4.0

10,563

27,794

Locations 1.0

03/01/00

05/31/00

03/01/07

12/31/07

86,000 03/01/00

05/30/00

124,383

100

0

0

Locations .0

0

Crossings

300 06 0197 / 5322

N CALIFORNIA AVE AND W HIRSCH ST

1.0

4,000 01/03/02

01/04/02

3,671

100

300 06 0197 / 5322

N KIMBALL AVE AND W ARMITAGE AVE

.50

2,000 10/02/01

10/02/01

178

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

3236 W DIVISION ST

Work Type: TSM Install

1.50

6,000

3,849

Intersections 34.0

11/15/03

11/21/03

0 11/12/03

11/19/03

5,376

100

Locations

300 06 0199 / 5324

N WESTERN AVE AND W POTOMAC AVE

.50

9,573 02/26/01

04/27/01

79,240

100

210 06 0028 / 4302

2400 N ALBANY AVE

1.0

07/15/98

09/30/98

175,000 12/15/98

02/15/99

127,277

100

814 06 0155 / 16369

1000 N CALIFORNIA AVE

1.0

02/05/93

02/05/93

0 02/05/93

02/05/93

76,127

100

814 06 0365 / 16556

1015 N HUMBOLDT DR

1.0

01/01/96

01/01/96

0 01/01/96

02/10/98

14,689

100

814 06 0366 / 16557

999 N SACRAMENTO BLVD

1.0

01/01/96

01/01/96

0 01/01/96

02/10/98

200,613

100

4.50

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 11 / 32190 Totals per Traffic

2601 W POTOMAC AVE

184,573

497,946

0

0

287,136

659,347

Locations .0

03/01/07

12/31/07

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 277

1/1/2008 AND 12/31/2008

Ward 26 Billy Ocasio CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Totals per Construction Phase

2,363,752

1,664,058

Totals for Ward 26

2,366,752

1,666,140

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 278

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0290 / 5397

CABRINI GREEN EXTENSION

.0

02/01/05

06/01/05

28,000 02/01/05

300 06 / 32453

FRANCIS CABRINI HOMES

.0

04/02/07

12/31/07

51,000 12/01/07

300 06 0211 / 5334

HENRY HORNER HOMES

.0

11/07/01

08/20/02

0 11/07/01

300 06 / 32277

ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE

1.0

04/01/08

08/30/08

65,000 05/06/08

300 06 / 32146

ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE

1.0

11/01/07

11/30/07

300 06 / 32277

ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE

1.50

04/01/08

08/30/08

300 06 / 32277

ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE

1.50

04/01/08

08/30/08

300 06 / 32146

ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE

1.0

05/01/07

10/31/07

300 06 0308 / 5414

ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE

.0

02/01/06

07/31/06

0 02/01/06

210 06 0243 / 4480

N ASHLAND AVE AND W CHICAGO AVE

.0

12/27/06

01/26/07

250 12/27/06

210 06 0240 / 4477

W NORTH AVE AND N SEDGWICK ST

.0

10/10/05

07/31/06

600 10/10/05

300 11 / 32232

W NORTH AVE AND N WELLS ST

1.0

06/01/07

12/31/07

300 06 0292 / 5399

327 N ADA ST

1.0

02/22/05

03/04/05

300 06 0314 / 5420

200-300 N WOLCOTT AVE

.0

04/01/06

12/31/06

300 06 0282 / 5390

650 W MADISON ST

1.0

09/29/04

10/21/04

1,000 05/01/04

300 06 0292 / 5399

536 W SCOTT ST

1.0

02/10/05

05/26/05

2,000 02/10/05

300 06 0314 / 5420

1800-1900 W WASHINGTON BLVD

.0

04/01/06

12/31/06

Totals per Design/Engineering

10.0

10/18/06

08/20/02

8,100

100

2,200

10

6,670

100

0

20

0

100

97,000 05/06/08

0

20

97,000 05/06/08

0

20

0

100

07/31/06

274

100

01/26/07

638

100

08/08/06

125

100

1,506

100

742

100

0

0

0 6,000 10/07/04

03/14/05

0

0

0

10/21/04

832

100

05/26/05

607

100

0

0

0

347,850

21,693

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 279

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON N HAMLIN AVE FROM W CHICAGO AVE TO W DIVISION ST

16.0

05/02/02

05/02/02

3,360 04/30/02

04/30/02

3,248

100

300 06 0069 / 5233

ON N HARDING AVE FROM W CHICAGO AVE TO W DIVISION ST

16.0

05/02/02

05/02/02

3,360 04/30/02

04/30/02

3,248

100

302 00 0092 / 5774

ON N LAWNDALE AVE FROM W CHICAGO AVE TO W IOWA ST

5.0

09/13/01

09/13/01

1,029 09/28/01

09/28/01

1,029

100

300 06 0069 / 5233

ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE

4.50

01/31/03

01/31/03

1,688 01/30/03

01/30/03

1,262

100

300 06 0069 / 5233

ON N SPRINGFIELD AVE FROM W CHICAGO AVE TO W DIVISION ST

16.0

05/02/02

05/02/02

3,360 04/30/02

04/30/02

3,248

100

300 06 0069 / 5233

1200 N AVERS AVE

5.0

0 06/04/02

06/04/02

1,875

100

300 06 / 32496

500 N DRAKE AVE

5.0

3,200 08/18/07

08/18/07

170

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 07 0042 / 5465

ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST

300 06 0225 / 5340

1901 W MADISON ST

Totals per 400 Watt Changeout Totals per Lighting/Electrical

08/01/07

08/10/07

67.50

15,997

14,080

Fixtures 6.50

01/10/07

01/31/07

124.0

11/15/03

11/30/03

130.50

2,600 49,600 11/13/03

12/08/03

2,600

100

27,325

100

52,200

29,925

3,914,688

2,696,656

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 280

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1500 / 7686

405 N ABERDEEN ST

1.0

11/15/97

11/15/97

0 11/15/97

11/15/97

300

100

805 06 1493 / 7679

431 N ABERDEEN ST

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

805 06 1495 / 7681

439 N ABERDEEN ST

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

302 00 0092 / 5774

614 N ADA ST

1.0

0 10/19/01

10/19/01

236

100

805 06 1491 / 7677

405 N CARPENTER ST

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

805 06 1494 / 7680

431 N CARPENTER ST

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

805 06 1496 / 7682

439 N CARPENTER ST

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

302 00 0092 / 5774

346 N JUSTINE ST

1.0

0 06/11/01

06/11/01

236

100

302 00 0092 / 5774

614 N MAY ST

1.0

0 09/28/01

09/28/01

236

100

805 06 0662 / 6848

1126 N RIDGEWAY AVE

1.0

0 05/17/96

05/17/96

300

100

302 00 0092 / 5774

1538 W AUGUSTA BLVD

1.0

0 05/13/01

05/13/01

236

100

805 06 0831 / 7017

3030 W CARROLL AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 0832 / 7018

3052 W CARROLL AVE

1.0

10/11/96

10/11/96

0 10/11/96

10/11/96

300

100

300 06 0139 / 5289

1463 W CHICAGO AVE

1,392.0

03/01/06

09/01/06

30,385 06/12/06

06/27/06

42,058

100

302 00 0092 / 5774

1463 W CHICAGO AVE

21.0

0 02/05/01

01/17/02

4,949

100

805 06 1599 / 7785

1401 W CORTEZ ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1600 / 7786

1417 W CORTEZ ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1601 / 7787

1440 W CORTEZ ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1534 / 7720

1455 W CORTEZ ST

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 1102 / 7288

1801 W FULTON ST

1.0

09/10/96

09/10/96

0 09/10/96

09/10/96

300

100

302 00 0092 / 5774

1354 W GRAND AVE

1.0

0 10/19/01

10/19/01

236

100

805 06 1237 / 7423

2119 W HUBBARD ST

1.0

0 04/03/96

04/03/96

300

100

302 00 0092 / 5774

1243 W OHIO ST

1.0

0 10/19/01

10/19/01

236

100

805 06 1470 / 7656

4028 W POTOMAC AVE

1.0

12/04/97

12/04/97

0 12/04/97

12/04/97

300

100

805 06 0499 / 6685

1716 W WASHINGTON BLVD

1.0

10/23/96

10/23/96

0 10/23/96

10/23/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

1463 W CHICAGO AVE

05/17/96

04/03/96

05/17/96

04/03/96

1,436.0

30,385

53,523

Lamps 3,228.0

06/01/07

12/31/07

95,032 07/10/07

09/01/07

95,032

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 281

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

Installations

1463 W CHICAGO AVE

3,133.0

0 06/20/02

06/23/02

57,046

100

Fixtures

Work Type: Flood Light Install 300 06 0198 / 5323

CABRINI GREEN EXTENSION

03/02/01

04/17/01

72,500 04/05/01

04/13/01

51,244

100

300 06 0198 / 5323

HENRY HORNER HOMES

01/16/01

03/14/01

60,625 03/09/01

03/14/01

49,839

100

300 06 0198 / 5323

WILLIAM GREEN HOMES

03/02/01

04/24/01

42,500 04/05/01

04/14/01

12,814

100

300 11 / 32216

ON N SAWYER AVE FROM W OHIO ST TO W HURON ST

10/05/07

10/05/07

1,200 10/05/07

10/05/07

586

100

300 06 0167 / 5306

ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST

1.60

0 09/23/99

09/23/99

263

100

300 06 0167 / 5306

825 N CARPENTER ST

1.0

0 01/07/99

01/07/99

351

100

300 06 0167 / 5306

1000 N NOBLE ST

2.0

0 01/09/99

01/09/99

702

100

300 06 0069 / 5233

1400 N ORLEANS ST

4.0

11/20/02

11/20/02

1,940 11/18/02

11/18/02

1,918

100

300 11 / 32216

600-700 N SAWYER AVE

2.0

10/05/07

10/15/07

1,000 10/10/07

10/10/07

586

100

302 00 0092 / 5774

100 S RACINE AVE

1.0

0 10/17/01

10/17/01

404

100

300 11 / 32216

1463 W CHICAGO AVE

1.0

300 06 0071 / 5234

618 W SCOTT ST

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0290 / 5397

CABRINI GREEN EXTENSION

300 06 0211 / 5334

no funding found in jcs. Note Last Updated on 29-JAN-08 HENRY HORNER HOMES

300 06 0292 / 5399

327 N ADA ST

300 06 0282 / 5390

650 W MADISON ST

300 06 0292 / 5399

536 W SCOTT ST

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts 300 06 / 32453

FRANCIS CABRINI HOMES

2.0

09/01/07

09/10/07

1,250 07/10/07

07/10/07

293

100

01/01/00

07/01/00

400,000 03/30/00

06/15/00

91,430

100

14.60

581,015

210,430

Installations .0

07/01/05

07/31/07

286,000 10/26/06

10/26/07

0

100

34.0

11/15/02

05/31/04

351,574 10/07/02

01/20/05

360,632

100

.0

03/18/05

12/31/05

6,000 01/22/06

12/31/05

7,592

100

70,000 10/08/04

11/08/04

74,690

100

0 07/28/05

08/05/05

0

100

1.0 .0

03/01/05

12/31/05

35.0

713,574

442,914

510,000

0

Projects .0

04/02/07

12/21/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 282

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 09 / 33093

ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE

300 06 0225 / 5340

1901 W MADISON ST

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

1463 W CHICAGO AVE

Work Type: Residntl Staggered Lighting

Fixtures 2.0 17.0

01/01/04

01/10/04

19.0

65,646 04/01/08

12/01/08

0

0

20,400 12/30/03

01/02/04

19,657

100

86,046

19,657

0

Lamps .0

03/01/08

12/01/08

0

Blocks

300 06 / 32277

ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON N DRAKE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

11/01/05

12/15/05

0 08/22/05

300 06 / 32146

ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE

4.0

12/07/07

05/29/08

381,586 01/02/08

300 09 / 33093

ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE

2.0

300 06 / 32277

ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE

300 11 / 32216

ON N KEYSTONE AVE FROM W THOMAS ST TO W DIVISION ST

300 06 / 32277

ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE

300 09 / 33093

ON N ST LOUIS AVE FROM W AUGUSTA BLVD TO W THOMAS ST

1.0

300 06 / 32146

ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE

2.0

300 09 / 33093

ON W HURON ST FROM N HARDING AVE TO N HAMLIN AVE

2.0

300 06 0308 / 5414

ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE

1.0

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

64,353 04/01/08

.0

05/04/08

12/31/08

1.0

02/15/08

04/04/08

.0

05/04/08

12/31/08

12/06/07

06/23/08

07/31/06

09/22/06

15.0

11/11/05

12/01/08

0 60,000 02/18/08

04/25/08

0 65,000 04/01/08

12/01/08

381,586

0

0

110,151

100

0

50

0

0

0

0

48,598

100

0

0

0

0

0

50

97,500 04/01/08

12/01/08

0

0

70,814 07/25/06

03/23/07

40,204

100

1,120,839

198,953

Blocks

300 06 0267 / 5375

ON W ERIE ST FROM N PULASKI RD TO N HARDING AVE

302 00 0092 / 5774

ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST

300 06 0235 / 5349

ON W HURON ST FROM N NOBLE ST TO N ASHLAND AVE

2.0

10/01/03

300 06 0267 / 5375

ON W HURON ST FROM N PULASKI RD TO N HARDING AVE

1.0

300 06 0314 / 5420

200-300 N WOLCOTT AVE

300 06 0314 / 5420

1800-1900 W WASHINGTON BLVD

Totals per Residntl Strt Lighting/Lamps

0

1.0

10/01/04

11/15/04

48,436 10/05/04

11/05/04

37,593

100

41,000 08/13/01

09/07/01

40,581

100

11/15/03

168,587 10/02/03

11/07/03

153,357

100

09/20/04

11/20/04

48,436 10/05/04

11/05/04

37,594

100

.0

10/15/06

09/30/08

89,000 07/19/07

08/12/08

88,176

100

.0

10/15/06

09/30/08

89,000 07/19/07

08/12/07

88,176

100

08/13/01

4.0

484,459

445,477

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 283

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

1413 N WIELAND ST

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1425 N WIELAND ST

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1449 N WIELAND ST

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1505 N WIELAND ST

1.0

0 03/23/01

03/23/01

378

100

302 00 0092 / 5774

1507 N WIELAND ST

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1515 N WIELAND ST

1.0

0 01/31/01

01/31/01

378

100

302 00 0092 / 5774

1529 N WIELAND ST

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

3800 W FERDINAND ST

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

3807 W FERDINAND ST

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

3817 W FERDINAND ST

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

3832 W FERDINAND ST

1.0

0 02/13/01

02/13/01

378

100

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

11.0

0

4,158

Locations

300 11 / 32191

ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST

3.57

11/14/08

12/15/08

893 11/14/08

12/15/08

714

100

300 09 / 33109

ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE

4.20

05/19/08

06/20/08

840 04/01/08

12/01/08

504

100

300 04 0216 / 5114

ON N PULASKI RD FROM W DIVISION ST TO W GRAND AVE

24.0

05/01/06

11/01/06

5,119 05/17/06

07/24/06

5,119

100

300 11 / 32191

ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST

1.56

11/14/08

12/16/08

390 11/14/08

12/16/08

312

100

300 04 0216 / 5114

ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST

10.50

05/01/06

11/01/06

2,235 05/17/06

07/12/06

2,235

100

300 07 0042 / 5465

ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST

6.50

04/18/06

11/18/06

1,625 08/14/06

09/01/06

1,283

100

302 00 0076 / 5764

ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE

61.50

09/01/00

12/31/00

300 06 0225 / 5340

1901 W MADISON ST

130.0

10/15/03

11/06/03

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 303 00 0006 / 5783

200 N ASHLAND AVE

300 06 0078 / 5241

800 N SPRINGFIELD AVE

300 06 0076 / 5239

300 W CHICAGO AVE

Totals per Strt Lighting

241.83

0 43,050 10/13/03

1,046 11/10/03

54,152

43,000

100

54,213

Blocks 1.0

1.0

08/01/97

12/01/97

60,000 08/01/97

04/30/98

76,547

100

10/01/00

02/01/01

6,300 05/15/98

05/26/98

0

100

03/19/01

05/19/01

58,500 03/02/01

03/20/01

0

100

124,800

76,547

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 284

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping

Lamps

300 06 0139 / 5289

1463 W CHICAGO AVE

1,981.0

03/01/04

12/01/04

21,190 10/02/06

10/12/06

21,573

100

300 06 0238 / 5352

1463 W CHICAGO AVE

2,103.0

06/01/06

12/31/06

25,000 10/02/06

10/12/06

22,902

100

Totals per Traffic Signal Regrouping

4,084.0

46,190

44,475

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 285

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2690 / 8876

200 N ABERDEEN ST

2.0

12/31/93

12/31/93

0 12/31/93

12/31/93

1,500

100

805 06 2956 / 9142

425 N ABERDEEN ST

12.0

02/15/94

02/15/94

0 02/15/94

02/15/94

9,000

100

805 06 2716 / 8902

198 N ADA ST

2.0

12/31/93

12/31/93

0 12/31/93

12/31/93

1,500

100

805 06 2351 / 8537

428 N ADA ST

14.0

08/26/94

08/26/94

0 08/26/94

08/26/94

10,500

100

805 06 2714 / 8900

205 N ARTESIAN AVE

2.0

12/31/93

12/31/93

0 12/31/93

12/31/93

1,500

100

805 06 2713 / 8899

198 N ASHLAND AVE

2.0

12/31/93

12/31/93

0 12/31/93

12/31/93

1,500

100

805 06 2197 / 8383

385 N ASHLAND AVE

26.0

01/05/94

01/05/94

0 01/05/94

01/05/94

19,500

100

805 06 2753 / 8939

435 N CARPENTER ST

14.0

02/10/94

02/10/94

0 02/10/94

02/10/94

10,500

100

805 06 2760 / 8946

385 N DAMEN AVE

26.0

08/04/93

08/04/93

0 08/04/93

08/04/93

19,500

100

805 06 2907 / 9093

430 N DESPLAINES ST

14.0

12/01/93

12/01/93

0 12/01/93

12/01/93

10,500

100

302 00 0070 / 5758

420 N ELIZABETH ST

0 02/07/97

02/14/97

6,482

100

805 06 2289 / 8475

900 N ELSTON AVE

26.0

08/28/96

08/28/96

0 08/28/96

08/28/96

19,500

100

805 06 2926 / 9112

640 N GREEN ST

18.0

11/24/93

11/24/93

0 11/24/93

11/24/93

13,500

100

805 06 2565 / 8751

430 N HALSTED ST

30.0

02/05/91

02/05/91

0 02/05/91

02/05/91

22,500

100

805 06 2761 / 8947

498 N HAMLIN AVE

12.0

05/06/94

05/06/94

0 05/06/94

05/06/94

9,000

100

805 06 2756 / 8942

339 N HOYNE AVE

34.0

05/14/93

05/14/93

0 05/14/93

05/14/93

25,500

100

805 06 2758 / 8944

339 N LEAVITT ST

22.0

05/03/93

05/03/93

0 05/03/93

05/03/93

16,500

100

805 06 2390 / 8576

808 N LESSING ST

15.0

01/24/96

01/24/96

0 01/24/96

01/24/96

11,250

100

805 06 2213 / 8399

430 N MAY ST

14.0

01/02/92

01/02/92

0 01/02/92

01/02/92

10,500

100

805 06 2174 / 8360

450 N MILWAUKEE AVE

17.0

12/31/95

12/31/95

0 12/31/95

12/31/95

12,750

100

805 06 2176 / 8362

450 N MILWAUKEE AVE

32.0

04/20/97

04/20/97

0 04/20/97

04/20/97

24,000

100

805 06 2200 / 8386

450 N MILWAUKEE AVE

17.0

12/31/95

12/31/95

0 12/31/95

12/31/95

12,750

100

805 06 2175 / 8361

455 N MILWAUKEE AVE

17.0

12/31/94

12/31/94

0 12/31/94

12/31/94

12,750

100

805 06 2173 / 8359

460 N MILWAUKEE AVE

17.0

12/31/94

12/31/94

0 12/31/94

12/31/94

12,750

100

302 00 0070 / 5758

700 N MILWAUKEE AVE

0 04/13/97

04/20/97

22,746

100

805 06 2400 / 8586

420 N MORGAN ST

14.0

02/22/94

02/22/94

0 02/22/94

02/22/94

10,500

100

805 06 2759 / 8945

389 N OAKLEY BLVD

22.0

06/03/94

06/03/94

0 06/03/94

06/03/94

16,500

100

805 06 2353 / 8539

398 N OGDEN AVE

34.0

07/19/93

07/19/93

0 07/19/93

07/19/93

25,500

100

805 06 2350 / 8536

430 N OGDEN AVE

16.0

07/19/93

07/19/93

0 07/19/93

07/19/93

12,000

100

805 06 2522 / 8708

389 N PAULINA ST

14.0

05/14/93

05/14/93

0 05/14/93

05/14/93

10,500

100

805 06 2562 / 8748

429 N PEORIA ST

16.0

04/19/95

04/19/95

0 04/19/95

04/19/95

12,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 286

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2534 / 8720

405 N PULASKI RD

12.0

04/07/95

04/07/95

0 04/07/95

04/07/95

9,000

100

805 06 2535 / 8721

405 N PULASKI RD

4.0

04/07/95

04/07/95

0 04/07/95

04/07/95

3,000

100

805 06 2536 / 8722

405 N PULASKI RD

8.0

04/07/95

04/07/95

0 04/07/95

04/07/95

6,000

100

805 06 2558 / 8744

405 N PULASKI RD

8.0

04/07/95

04/07/95

0 04/07/95

04/07/95

6,000

100

302 00 0071 / 5759

420 N RACINE AVE

0 01/27/99

02/05/99

15,129

100

805 06 2187 / 8373

430 N RACINE AVE

10.0

01/23/92

01/23/92

0 01/23/92

01/23/92

7,500

100

805 06 2252 / 8438

948 N RACINE AVE

14.0

10/16/96

10/16/96

0 10/16/96

10/16/96

10,500

100

805 06 2777 / 8963

345 N SACRAMENTO BLVD

22.0

04/21/94

04/21/94

0 04/21/94

04/21/94

16,500

100

805 06 2224 / 8410

798 N SACRAMENTO BLVD

14.0

12/30/96

12/30/96

0 12/30/96

12/30/96

10,500

100

805 06 2230 / 8416

798 N SACRAMENTO BLVD

11.0

12/30/96

12/30/96

0 12/30/96

12/30/96

8,250

100

805 06 2231 / 8417

798 N SACRAMENTO BLVD

8.0

12/30/96

12/30/96

0 12/30/96

12/30/96

6,000

100

805 06 2265 / 8451

799 N SACRAMENTO BLVD

6.0

12/30/96

12/30/96

0 12/30/96

12/30/96

4,500

100

805 06 2529 / 8715

430 N SANGAMON ST

14.0

01/02/92

01/02/92

0 01/02/92

01/02/92

10,500

100

805 06 2537 / 8723

850 N SANGAMON ST

30.0

05/31/95

05/31/95

0 05/31/95

05/31/95

22,500

100

805 06 2532 / 8718

890 N SANGAMON ST

24.0

06/04/95

06/04/95

0 06/04/95

06/04/95

18,000

100

805 06 2778 / 8964

998 N SPAULDING AVE

16.0

06/01/94

06/01/94

0 06/01/94

06/01/94

12,000

100

805 06 2215 / 8401

501 N UNION AVE

18.0

12/09/96

12/09/96

0 12/09/96

12/09/96

13,500

100

805 06 2355 / 8541

388 N WESTERN AVE

28.0

08/04/93

08/04/93

0 08/04/93

08/04/93

21,000

100

805 06 2541 / 8727

370 N WOLCOTT AVE

34.0

05/25/95

05/25/95

0 05/25/95

05/25/95

25,500

100

805 06 2523 / 8709

388 N WOOD ST

22.0

05/01/95

05/01/95

0 05/01/95

05/01/95

16,500

100

805 06 2590 / 8776

1029 S CENTRAL PARK AVE

20.0

08/01/93

08/01/93

0 08/01/93

08/01/93

15,000

100

805 06 2731 / 8917

819 W ANCONA ST

4.0

06/01/94

06/01/94

0 06/01/94

06/01/94

3,000

100

805 06 2216 / 8402

1212 W AUGUSTA BLVD

30.0

12/09/96

12/09/96

0 12/09/96

12/09/96

22,500

100

805 06 2315 / 8501

3301 W AUGUSTA BLVD

24.0

05/23/96

05/23/96

0 05/23/96

05/23/96

18,000

100

805 06 2317 / 8503

3301 W AUGUSTA BLVD

24.0

05/23/96

05/23/96

0 05/23/96

05/23/96

18,000

100

805 06 2406 / 8592

3305 W AUGUSTA BLVD

24.0

05/23/96

05/23/96

0 05/23/96

05/23/96

18,000

100

805 06 2405 / 8591

3310 W AUGUSTA BLVD

24.0

05/23/96

05/23/96

0 05/23/96

05/23/96

18,000

100

805 06 2381 / 8567

950 W CHICAGO AVE

17.0

01/24/96

01/24/96

0 01/24/96

01/24/96

12,750

100

805 06 2225 / 8411

3100 W CHICAGO AVE

24.0

06/16/94

06/16/94

0 06/16/94

06/16/94

18,000

100

805 06 2937 / 9123

2535 W FULTON ST

12.0

06/29/93

06/29/93

0 06/29/93

06/29/93

9,000

100

805 06 2938 / 9124

2625 W FULTON ST

12.0

07/01/93

07/01/93

0 07/01/93

07/01/93

9,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 287

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2211 / 8397

663 W GRAND AVE

4.0

02/10/97

02/10/97

0 02/10/97

02/10/97

3,000

100

805 06 2212 / 8398

663 W GRAND AVE

4.0

12/31/95

12/31/95

0 12/31/95

12/31/95

3,000

100

805 06 2205 / 8391

664 W GRAND AVE

18.0

02/10/97

02/10/97

0 02/10/97

02/10/97

13,500

100

302 00 0070 / 5758

700 W GRAND AVE

0 02/01/97

02/10/97

15,559

100

805 06 2210 / 8396

3359 W GRAND AVE

0 12/31/95

12/31/95

7,500

100

302 00 0070 / 5758

3400 W GRAND AVE

0 12/01/97

12/08/97

15,811

100

805 06 2143 / 8329

3400 W GRAND AVE

16.0

12/08/97

12/08/97

0 12/08/97

12/08/97

12,000

100

805 06 2613 / 8799

1029 W HUBBARD ST

3.0

11/30/94

11/30/94

0 11/30/94

11/30/94

2,250

100

805 06 2301 / 8487

870 W HURON ST

14.0

11/16/93

11/16/93

0 11/16/93

11/16/93

10,500

100

805 06 2106 / 8292

1401 W KINZIE ST

8.0

12/12/95

12/12/95

0 12/12/95

12/12/95

6,000

100

805 06 2408 / 8594

2623 W LAKE ST

12.0

01/05/96

01/05/96

0 01/05/96

01/05/96

9,000

100

805 06 2314 / 8500

2630 W LAKE ST

12.0

01/05/96

01/05/96

0 01/05/96

01/05/96

9,000

100

805 06 2318 / 8504

2633 W LAKE ST

12.0

01/05/96

01/05/96

0 01/05/96

01/05/96

9,000

100

805 06 2407 / 8593

2633 W LAKE ST

12.0

01/05/96

01/05/96

0 01/05/96

01/05/96

9,000

100

805 06 2581 / 8767

701 W OHIO ST

8.0

03/08/95

03/08/95

0 03/08/95

03/08/95

6,000

100

805 06 2730 / 8916

833 W SUPERIOR ST

14.0

08/08/94

08/08/94

0 08/08/94

08/08/94

10,500

100

Totals per Underpass Lighting

10.0

1,166.0

12/31/95

12/31/95

0

950,227

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 288

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 210 06 0022 / 4297

1444 W AUGUSTA BLVD

Work Type: LED Signal Head Install

Locations 1.0

01/15/02

01/25/02

23,000 01/09/02

01/11/02

16,907

100

Locations

210 06 0130 / 4389

N HAMLIN AVE AND W DIVISION ST

1.0

0 12/04/01

12/04/01

8,539

100

210 06 0130 / 4389

N HOMAN AVE AND W FRANKLIN BLVD

.50

0 05/02/02

05/02/02

4,270

100

210 06 0130 / 4389

N ORLEANS ST AND W CHICAGO AVE

.50

0 04/12/02

04/12/02

3,953

100

210 06 0130 / 4389

N WELLS ST AND W CHICAGO AVE

.50

0 04/10/02

04/10/02

4,270

100

210 06 0219 / 4459

N WESTERN AVE AND W LAKE ST

.50

03/24/05

03/25/05

5,282 03/01/05

03/01/05

4,365

100

300 06 0251 / 5361

W CHICAGO AVE AND N HALSTED ST

1.0

06/01/06

07/01/06

30,500 07/01/06

07/26/06

10,484

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

4.0

35,782

35,880

Locations

210 06 0231 / 4470

W GRAND AVE AND N HALSTED ST

.0

03/01/08

12/01/08

0

0

0

210 06 0231 / 4470

W GRAND AVE AND N MILWAUKEE AVE

.0

03/01/08

12/01/08

0

0

0

0

0

Totals per Left Turn Arrow

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

N ASHLAND AVE AND W CHICAGO AVE

210 06 0240 / 4477 300 11 / 32232

03/15/06

05/08/07

10713013 Note Last Updated on 03-APR-08 W NORTH AVE AND N SEDGWICK ST

4.0

11/01/05

W NORTH AVE AND N WELLS ST

1.0

07/25/07

Work Type: Pedestrian Countdown Signal Installation Totals per Traffic

Locations .0

Totals per Pedestrian Countdown Signal Install

300 11 / 32600

.0

W NORTH AVE AND N WELLS ST

6,000 01/26/07

02/09/07

2,994

100

09/30/06

5,000 11/01/05

10/16/06

2,979

100

10/31/07

12,000 08/01/07

08/02/07

5,776

100

5.0

23,000

11,749

Installations 1.0

09/08/07

01/04/08

11,520 08/01/07 272,097

08/02/07

0 1,249,534

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 289

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals

Crossings

300 06 0197 / 5322

N CALIFORNIA AVE AND W LAKE ST

.50

2,000 07/18/01

04/08/02

1,285

100

300 06 0197 / 5322

N HAMLIN AVE AND W DIVISION ST

3.0

12,000 04/08/02

04/08/02

0

100

300 06 0197 / 5322

N LARRABEE ST AND W DIVISION ST

1.0

4,000 07/26/01

07/31/01

11,590

100

300 06 0197 / 5322

N MILWAUKEE AVE AND W ERIE ST

1.0

4,000 07/25/01

04/08/02

175

100

Totals per Removal Temp Wiring - Signals

Work Type: Signal Removal 300 06 0225 / 5340

N DESPLAINES ST AND W RANDOLPH ST

Work Type: Signals 300 06 0096 / 5258

1463 W CHICAGO AVE

Work Type: TSM Install

5.50

22,000

13,050

Locations .50

11/01/02

11/30/02

2,500 09/25/02

11/14/02

1,906

100

11/01/03

11/07/03

0 11/20/03

11/28/03

25,457

100

Intersections 161.0

Locations

814 06 0160 / 16373

150 N DESPLAINES ST

1.0

02/13/92

02/13/92

0 02/13/92

02/13/92

106,743

100

814 06 0185 / 16397

300 N DESPLAINES ST

1.0

03/04/92

03/04/92

0 03/04/92

03/04/92

106,743

100

814 06 0187 / 16399

453 N MILWAUKEE AVE

1.0

03/20/92

03/20/92

0 03/20/92

03/20/92

106,743

100

814 06 0270 / 16482

1000 N MILWAUKEE AVE

1.0

12/04/90

12/04/90

0 12/04/90

12/04/90

94,307

100

814 06 0053 / 16270

100 N MORGAN ST

1.0

08/02/96

08/02/96

0 08/02/96

08/02/96

123,933

100

814 06 0266 / 16478

1482 N OGDEN AVE

1.0

03/12/92

03/12/92

0 03/12/92

03/12/92

108,062

100

814 06 0264 / 16476

800 N ORLEANS ST

1.0

03/13/92

03/13/92

0 03/13/92

03/13/92

108,062

100

814 06 0052 / 16269

100 N SANGAMON ST

1.0

08/05/96

08/05/96

0 08/05/96

08/05/96

158,482

100

814 06 0083 / 16299

1327 W DIVISION ST

1.0

10/05/93

10/05/93

0 10/05/93

10/05/93

26,873

100

814 06 0326 / 16530

1600 W MADISON ST

1.0

01/01/96

01/01/96

0 01/01/96

04/10/97

100,000

100

210 06 0006 / 4281

1800 W MADISON ST

1.0

03/01/00

05/31/00

150,000 03/16/00

04/24/00

102,142

11.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

150,000

1,142,090

Locations

300 11 / 32191

ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST

2.94

11/14/08

12/15/08

1,006 11/14/08

12/15/08

947

100

300 11 / 32191

ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST

4.81

11/14/08

12/16/08

1,820 11/14/08

12/16/08

1,549

100

300 06 0108 / 5263

N WELLS ST AND W NORTH AVE

04/01/05

04/10/05

1,470

0

4,296

2,496

Totals per Traffic Equipment Painting

7.75

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 290

1/1/2008 AND 12/31/2008

Ward 27 Walter Burnett, Jr. CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Totals per Construction Phase

4,186,785

3,946,190

Totals for Ward 27

4,534,635

3,967,883

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 291

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,352

100

300 06 0308 / 5414

ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,566

100

300 06 0292 / 5399

9 N LARAMIE AVE

.0

02/18/05

300 06 0282 / 5390

2750 W ROOSEVELT RD

1.0

10/26/04

Totals per Design/Engineering

1.0

2,000 02/18/05 11/16/04

2,500 11/01/04 4,500

11/16/04

842

0

2,175

100

5,935

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 292

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 09 / 33094

ON N LEAMINGTON AVE FROM W KINZIE ST TO W OHIO ST

5.0

302 00 0092 / 5774

ON N PINE AVE FROM W LAKE ST TO W FERDINAND ST

3.0

300 05 0024 / 5139

ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE

1.50

04/04/05

300 11 / 32217

ON W MAYPOLE AVE FROM N KOSTNER AVE TO N KENTON AVE

12.0

08/01/07

300 06 0069 / 5233

400 N PINE AVE

2.0

04/20/02

302 00 0092 / 5774

5000-5099 W GLADYS AVE

7.0

302 00 0092 / 5774

3000-3099 W LEXINGTON ST

5.0

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 06 0122 / 5275

ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST

300 09 / 33068

ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD

Totals per 400 Watt Changeout Totals per Lighting/Electrical

2,000

10/23/01

0

0

618

100

08/10/05

329

100

08/16/07

5,000

100

420 04/17/02

04/17/02

406

100

0 12/17/01

12/17/01

1,421

100

1,029 09/28/01

09/28/01

1,029

100

0 02/01/02

02/06/02

11/18/05

1,050 07/15/05

08/10/07

5,000 08/16/07

04/20/02

10/23/01

35.50

9,499

8,803

Fixtures 6.0

08/01/04

08/15/04

2,500 06/10/04

06/10/04

1,506

100

4.50

06/09/08

06/13/08

1,800 06/09/08

06/13/08

1,449

100

10.50

4,300

2,955

1,958,443

2,145,237

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 293

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1077 / 7263

208 N HAMLIN BLVD

1.0

10/23/96

10/23/96

0 10/23/96

10/23/96

300

100

805 06 1169 / 7355

262 N KEELER AVE

1.0

05/31/95

05/31/95

0 05/31/95

05/31/95

300

100

805 06 0344 / 6530

548 N LARAMIE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

302 00 0092 / 5774

118 N PULASKI RD

5.0

0 07/19/01

12/13/01

1,178

100

300 06 0139 / 5289

259 N PULASKI RD

1,747.0

03/01/06

09/01/06

40,500 07/01/06

07/15/06

52,784

100

805 06 0925 / 7111

1000 S FRANCISCO AVE

1.0

11/15/96

11/15/96

0 11/15/96

11/15/96

300

100

805 06 1919 / 8105

1100 S MOZART ST

1.0

11/18/96

11/18/96

0 11/18/96

11/18/96

300

100

805 06 0685 / 6871

1100 S RICHMOND ST

1.0

11/18/96

11/18/96

0 11/18/96

11/18/96

300

100

805 06 0363 / 6549

210 S TROY ST

1.0

06/14/96

06/14/96

0 06/14/96

06/14/96

300

100

805 06 0974 / 7160

2620 W 15TH PL

1.0

07/06/95

07/06/95

0 07/06/95

07/06/95

300

100

805 06 0953 / 7139

2722 W 23RD ST

1.0

10/26/95

10/26/95

0 10/26/95

10/26/95

300

100

805 06 0785 / 6971

3540 W ADAMS ST

1.0

07/24/96

07/24/96

0 07/24/96

07/24/96

300

100

805 06 0716 / 6902

4818 W ERIE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1726 / 7912

4917 W FERDINAND ST

1.0

05/23/97

05/23/97

0 05/23/97

05/23/97

300

100

805 06 0898 / 7084

2800 W FILLMORE ST

1.0

11/18/96

11/18/96

0 11/18/96

11/18/96

300

100

805 06 0689 / 6875

2926 W FILLMORE ST

1.0

10/10/95

10/10/95

0 10/10/95

10/10/95

300

100

805 06 1214 / 7400

4903 W HUBBARD ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1336 / 7522

3526 W JACKSON BLVD

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 2005 / 8191

5323 W LAKE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1849 / 8035

4605 W MADISON ST

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 1834 / 8020

4202 W MAYPOLE AVE

1.0

06/21/95

06/21/95

0 06/21/95

06/21/95

300

100

805 06 1754 / 7940

4702 W OHIO ST

1.0

05/23/97

05/23/97

0 05/23/97

05/23/97

300

100

805 06 1755 / 7941

4716 W OHIO ST

1.0

05/23/97

05/23/97

0 05/23/97

05/23/97

300

100

302 00 0092 / 5774

5147 W WASHINGTON ST

1.0

0 12/10/01

12/10/01

236

100

805 06 0524 / 6710

4719 W WEST END AVE

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

805 06 0512 / 6698

4732 W WEST END AVE

1.0

08/14/95

08/14/95

0 08/14/95

08/14/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

259 N PULASKI RD

1,776.0

40,500

61,098

Lamps 2,592.0

06/01/07

12/31/07

76,308 06/08/07

07/11/07

76,308

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 294

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

Installations

118 N PULASKI RD

2,497.0

Work Type: Flood Light Install

Fixtures 05/18/01

06/11/02

45,466

100

300 06 0198 / 5323

OGDEN COURTS

8,375 05/30/01

05/31/01

4,887

100

300 06 0069 / 5233

ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE

1.25

469 06/24/02

06/24/02

469

100

300 06 0167 / 5306

W JACKSON BLVD AND S FRANCISCO AVE

1.50

0 12/08/99

12/08/99

527

100

300 06 0167 / 5306

W MONROE ST AND S CENTRAL PARK AVE

6.0

0 03/24/99

03/24/99

1,429

100

300 06 0071 / 5234

100 N CENTRAL PARK AVE

0 02/01/99

01/12/01

427,832

100

300 06 0167 / 5306

119 S CENTRAL PARK AVE

1.0

0 12/08/99

12/08/99

351

100

302 00 0092 / 5774

2424 W 18TH ST

1.0

0 10/15/01

10/15/01

404

100

02/01/99

300 06 0292 / 5399

01/31/01

10.75

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

05/19/01

0 06/08/02

8,844

435,898

Installations

9 N LARAMIE AVE

Work Type: Lighting Imprvmnts

1.0

07/17/06

12/31/06

5,497 07/26/06

12/31/06

5,924

25

Projects

300 06 0201 / 5325

190 N CENTRAL PARK DR

1.0

06/01/01

12/01/01

90,216 06/14/01

06/29/01

84,143

100

300 06 0201 / 5325

200 N PULASKI RD

1.0

10/01/01

12/31/01

100,820 10/04/01

11/28/01

108,257

100

300 06 0118 / 5272

5200 W LAKE ST

1.0

10/30/00

06/29/01

31,888 04/12/01

05/31/01

22,855

100

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting 300 09 / 33068

ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD

Work Type: Residential Regrouping 300 06 0270 / 5378

259 N PULASKI RD

3.0

222,924

215,255

Fixtures 4.50

07/28/08

08/08/08

03/01/08

12/01/08

9,000 07/28/08

08/08/08

5,153

100

0

0

Lamps .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 295

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33094

ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST

1.0

300 05 0028 / 5143

ON N PINE AVE FROM W LAKE ST TO W RACE AVE

1.0

09/15/05

11/18/05

300 07 0002 / 5425

ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST

1.0

04/18/06

11/18/06

300 09 / 33094

ON W ADAMS ST FROM S CICERO AVE TO S LARAMIE AVE

4.0

260,000

300 11 / 32217

ON W ADAMS ST FROM S HOMAN AVE TO S CENTRAL PARK BLVD

2.0

300 11 / 32217

ON W ADAMS ST FROM S KENTON AVE TO S CICERO AVE

2.0

300 07 0029 / 5452

ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE

1.0

07/12/06

09/27/06

65,000 07/20/06

300 07 0028 / 5451

ON W MONROE ST FROM S CICERO AVE TO S LAVERGNE AVE

2.0

04/01/07

06/01/07

300 06 0308 / 5414

ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE

1.0

04/24/06

06/16/06

300 06 0308 / 5414

ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE

2.0

09/01/06

11/22/06

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

65,000

17.0

0

0

60,000 08/18/05

10/14/05

44,514

100

80,000 09/01/06

10/27/06

51,733

100

0

0

140,000

0

0

140,000

0

0

09/27/06

59,636

100

100,000 10/05/06

11/17/06

80,345

100

91,485 04/19/06

06/19/06

63,076

100

165,823 08/04/06

10/24/06

117,933

100

1,167,308

417,236

Blocks

300 06 0235 / 5349

ON N LATROBE AVE FROM W OHIO ST TO W CHICAGO AVE

2.0

06/21/03

08/21/03

165,298 07/07/03

10/06/03

158,431

100

300 06 0267 / 5375

ON W MONROE ST FROM S LAVERGNE AVE TO S LARAMIE AVE

2.0

10/01/04

12/01/04

194,928 10/12/04

12/03/04

142,679

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

4.0

360,226

301,110

Locations

302 00 0092 / 5774

2101 S FAIRFIELD AVE

1.0

0 06/14/01

06/14/01

378

100

302 00 0092 / 5774

3000 W HARRISON ST

1.0

0 05/16/01

05/16/01

378

100

302 00 0092 / 5774

3020 W HARRISON ST

1.0

0 05/16/01

05/16/01

378

100

302 00 0092 / 5774

3030 W HARRISON ST

1.0

0 05/16/01

05/16/01

378

100

302 00 0092 / 5774

3040 W HARRISON ST

1.0

0 05/16/01

05/16/01

378

100

5.0

0

Totals per Short Arm Installs - Residntl

1,890

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 296

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 11 / 32191

ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST

5.60

11/14/08

12/16/08

1,400 11/14/08

12/16/08

1,120

100

300 04 0216 / 5114

ON S PULASKI RD FROM W JACKSON BLVD TO W MADISON ST

22.0

05/01/06

11/01/06

4,687 05/17/06

06/22/06

4,687

100

300 06 0108 / 5263

ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST

6.0

08/10/04

08/11/04

1,500 07/23/04

07/28/04

1,476

100

300 11 / 32191

ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST

22.80

11/14/08

12/16/08

5,700 11/14/08

12/16/08

4,560

100

300 09 / 33068

ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD

5.76

06/02/08

06/20/08

1,728 06/02/08

06/26/08

1,210

100

300 09 / 33068

15.25

10/07/08

10/22/08

4,575 10/07/08

10/22/08

3,203

100

300 09 / 33068

ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD AVE ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD

16.80

08/13/08

09/09/08

5,040 08/13/08

09/09/08

3,528

100

300 11 / 32191

ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE

9.36

11/14/08

12/15/08

2,340 11/14/08

12/15/08

1,872

100

300 11 / 32191

ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE

10.08

11/14/08

12/16/08

2,520 11/14/08

12/16/08

2,016

100

Totals per Strt Light Pole Painting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

259 N PULASKI RD

113.65

29,490

23,671

Lamps 3,175.0

03/01/04

12/01/04

16,510 10/05/06

10/13/06

34,576

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 297

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2549 / 8735

401 N CENTRAL AVE

16.0

09/11/91

09/11/91

0 09/11/91

09/11/91

12,000

100

805 06 2457 / 8643

340 N CENTRAL PARK AVE

10.0

09/18/95

09/18/95

0 09/18/95

09/18/95

7,500

100

302 00 0070 / 5758

400 N CICERO AVE

0 02/01/97

02/07/97

4,554

100

805 06 2697 / 8883

334 N KEDZIE AVE

18.0

10/07/94

10/07/94

0 10/07/94

10/07/94

13,500

100

805 06 2930 / 9116

395 N LARAMIE AVE

14.0

08/16/91

08/16/91

0 08/16/91

08/16/91

10,500

100

805 06 2929 / 9115

395 N LAVERGNE AVE

14.0

03/04/94

03/04/94

0 03/04/94

03/04/94

10,500

100

805 06 2766 / 8952

398 N LOCKWOOD AVE

14.0

04/29/94

04/29/94

0 04/29/94

04/29/94

10,500

100

805 06 2767 / 8953

399 N LONG AVE

16.0

06/25/93

06/25/93

0 06/25/93

06/25/93

12,000

100

805 06 2547 / 8733

401 N PINE AVE

14.0

04/27/95

04/27/95

0 04/27/95

04/27/95

10,500

100

300 06 0217 / 5337

118 N PULASKI RD

143.0

05/12/04

05/14/04

8,038 01/16/04

01/21/04

11,740

100

805 06 2781 / 8967

343 N ST LOUIS AVE

6.0

12/23/94

12/23/94

0 12/23/94

12/23/94

4,500

100

805 06 2168 / 8354

1001 S CALIFORNIA AVE

14.0

12/31/95

12/31/95

0 12/31/95

12/31/95

10,500

100

805 06 2786 / 8972

1901 S CALIFORNIA AVE

6.0

05/20/94

05/20/94

0 05/20/94

05/20/94

4,500

100

805 06 2940 / 9126

1005 S FAIRFIELD AVE

8.0

03/14/94

03/14/94

0 03/14/94

03/14/94

6,000

100

805 06 2780 / 8966

1001 S FRANCISCO AVE

14.0

06/07/94

06/07/94

0 06/07/94

06/07/94

10,500

100

805 06 2800 / 8986

1000 S SACRAMENTO BLVD

8.0

04/07/94

04/07/94

0 04/07/94

04/07/94

6,000

100

805 06 2779 / 8965

1001 S WASHTENAW AVE

10.0

04/26/94

04/26/94

0 04/26/94

04/26/94

7,500

100

805 06 2360 / 8546

2401 W 15TH ST

56.0

04/02/96

04/02/96

0 04/02/96

04/02/96

42,000

100

805 06 2494 / 8680

2405 W 16TH ST

21.0

09/14/95

09/14/95

0 09/14/95

09/14/95

15,750

100

805 06 2495 / 8681

2405 W 16TH ST

20.0

09/14/95

09/14/95

0 09/14/95

09/14/95

15,000

100

805 06 2203 / 8389

2400 W 18TH ST

24.0

08/16/92

08/16/92

0 08/16/92

08/16/92

18,000

100

302 00 0072 / 5760

2500 W 21ST ST

1.0

0 10/21/99

01/05/00

35,750

100

805 06 2762 / 8948

4599 W ADAMS ST

4.0

05/01/94

05/01/94

0 05/01/94

05/01/94

3,000

100

805 06 2932 / 9118

2505 W ARTHINGTON ST

8.0

02/01/94

02/01/94

0 02/01/94

02/01/94

6,000

100

805 06 2306 / 8492

4599 W CHICAGO AVE

38.0

08/13/96

08/13/96

0 08/13/96

08/13/96

28,500

100

805 06 2764 / 8950

4605 W FULTON ST

4.0

05/24/94

05/24/94

0 05/24/94

05/24/94

3,000

100

805 06 2574 / 8760

4601 W LAKE ST

8.0

03/27/95

03/27/95

0 03/27/95

03/27/95

6,000

100

805 06 2392 / 8578

4600 W MADISON ST

5.0

12/31/95

12/31/95

0 12/31/95

12/31/95

3,750

100

805 06 2763 / 8949

4601 W MAYPOLE AVE

8.0

05/20/94

05/20/94

0 05/20/94

05/20/94

6,000

100

805 06 2733 / 8919

4597 W MONROE ST

4.0

07/06/94

07/06/94

0 07/06/94

07/06/94

3,000

100

302 00 0072 / 5760

4650 W MONROE ST

1.0

0 04/26/00

05/15/00

25,851

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 298

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2509 / 8695

2440 W OGDEN AVE

8.0

07/07/95

07/07/95

0 07/07/95

07/07/95

6,000

100

805 06 2512 / 8698

2440 W OGDEN AVE

8.0

06/16/95

06/16/95

0 06/16/95

06/16/95

6,000

100

805 06 2507 / 8693

2457 W OGDEN AVE

9.0

06/29/95

06/29/95

0 06/29/95

06/29/95

6,750

100

805 06 2526 / 8712

2457 W OGDEN AVE

3.0

06/21/95

06/21/95

0 06/21/95

06/21/95

2,250

100

805 06 2550 / 8736

2457 W OGDEN AVE

10.0

06/22/95

06/22/95

0 06/22/95

06/22/95

7,500

100

805 06 2594 / 8780

2457 W OGDEN AVE

15.0

06/16/95

06/16/95

0 06/16/95

06/16/95

11,250

100

805 06 2580 / 8766

2460 W OGDEN AVE

3.0

06/29/95

06/29/95

0 06/29/95

06/29/95

2,250

100

805 06 2510 / 8696

2500 W OGDEN AVE

16.0

07/07/95

07/07/95

0 07/07/95

07/07/95

12,000

100

805 06 2513 / 8699

2500 W OGDEN AVE

21.0

06/16/95

06/16/95

0 06/16/95

06/16/95

15,750

100

805 06 2508 / 8694

2520 W OGDEN AVE

8.0

06/29/95

06/29/95

0 06/29/95

06/29/95

6,000

100

805 06 2511 / 8697

2520 W OGDEN AVE

12.0

07/07/95

07/07/95

0 07/07/95

07/07/95

9,000

100

805 06 2572 / 8758

2520 W OGDEN AVE

8.0

07/06/95

07/06/95

0 07/06/95

07/06/95

6,000

100

805 06 2228 / 8414

2519 W ROOSEVELT RD

14.0

10/29/96

10/29/96

0 10/29/96

10/29/96

10,500

100

805 06 2253 / 8439

2519 W ROOSEVELT RD

37.0

10/29/96

10/29/96

0 10/29/96

10/29/96

27,750

100

805 06 2705 / 8891

2505 W TAYLOR ST

14.0

07/27/94

07/27/94

0 07/27/94

07/27/94

10,500

100

805 06 2916 / 9102

4605 W WASHINGTON BLVD

8.0

03/21/94

03/21/94

0 03/21/94

03/21/94

6,000

100

Totals per Underpass Lighting

721.0

8,038

509,895

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 299

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N HOMAN AVE AND W FRANKLIN BLVD

.50

0 05/02/02

05/02/02

4,270

100

210 06 0130 / 4389

N KEELER AVE AND W WASHINGTON ST

1.0

0 03/26/02

03/26/02

5,651

100

210 06 0219 / 4459

S WESTERN AVE AND W 16TH ST

.50

03/10/05

03/11/05

5,282 04/28/05

04/28/05

4,004

100

210 06 0219 / 4459

S WESTERN AVE AND W ROOSEVELT RD

.50

03/14/05

03/15/05

5,282 03/28/05

03/28/05

4,783

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 300 03 0028 / 4899

N CICERO AVE AND W MADISON ST

Work Type: Removal Temp Wiring - Signals

2.50

10,563

18,707

96,500 04/07/05

29,678

40

Locations 1.0

03/01/05

08/15/05

Crossings

300 06 0197 / 5322

N LONG AVE AND W WASHINGTON BLVD

2.0

8,000 10/04/01

10/10/01

9,370

100

300 06 0197 / 5322

S SACRAMENTO AVE AND W ARTHINGTON ST

2.0

8,000 07/17/01

07/27/01

10,535

100

300 06 0197 / 5322

S SACRAMENTO AVE AND W FIFTH AVE

.50

2,000 07/18/01

07/19/01

1,948

100

300 06 0197 / 5322

W CERMAK RD AND S WASHTENAW AVE

1.0

4,000 06/25/01

07/11/01

2,097

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

118 N PULASKI RD

Work Type: TSM Install

5.50

22,000

23,950

Intersections 71.0

11/01/03

11/07/03

0 11/11/03

11/17/03

11,227

100

Locations

814 06 0245 / 16457

100 N CICERO AVE

1.0

02/06/92

02/06/92

0 02/06/92

02/06/92

40,173

100

814 06 0247 / 16459

199 N CICERO AVE

1.0

01/01/92

01/01/92

0 01/01/92

01/01/92

40,173

100

814 06 0116 / 16331

500 N CICERO AVE

1.0

07/02/92

07/02/92

0 07/02/92

07/02/92

103,965

100

814 06 0231 / 16443

600 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

92,500

100

814 06 0220 / 16432

1 S CICERO AVE

1.0

02/13/92

02/13/92

0 02/13/92

02/13/92

40,173

100

814 06 0223 / 16435

300 S CICERO AVE

1.0

02/13/92

02/13/92

0 02/13/92

02/13/92

40,173

100

814 06 0391 / 16579

4000 W JACKSON BLVD

1.0

02/06/96

02/06/96

0 02/06/96

02/06/96

152,719

100

Totals per TSM Install Totals per Traffic

7.0

0

509,876

144,150

599,688

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 300

1/1/2008 AND 12/31/2008

Ward 28 Ed H. Smith CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 11 / 32191

ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST

300 11 / 32191

ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST

3.36

11/14/08

12/16/08

300 09 / 33068

ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD

1.92

06/02/08

06/20/08

534 04/01/08

300 07 0024 / 5447

ON W FIFTH AVE FROM S ALBANY AVE TO S KEDZIE AVE

16.0

04/18/06

11/18/06

300 11 / 32191

ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE

3.84

11/14/08

12/15/08

300 11 / 32191

ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE

1.68

11/14/08

12/16/08

13.68

40.48

1,149 11/14/08

12/16/08

4,899

1,082

0

12/01/08

0

100

6,500 07/15/06

07/24/06

3,392

100

1,416 11/14/08

12/15/08

1,236

100

588 11/14/08

12/16/08

541

100

15,087

6,251

Totals per Construction Phase

2,102,593

2,744,926

Totals for Ward 28

2,107,093

2,750,860

Totals per Traffic Equipment Painting

100

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 301

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32275

ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

.0

03/01/07

10/31/07

2,216

100

300 06 / 32277

ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE

.0

04/01/08

08/30/08

0

0

0

300 06 / 32277

ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE

.0

04/01/08

08/30/08

0

0

0

300 06 0308 / 5414

ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,352

100

300 06 0308 / 5414

ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

334

100

210 06 / 32040

N AUSTIN BLVD AND W LAKE ST

.0

11/01/06

12/31/07

5,000 10/03/06

10/20/06

3,505

100

210 06 0243 / 4480

W HARRISON ST AND S LARAMIE AVE

.0

12/26/06

01/26/07

250 12/26/06

01/26/07

638

100

281 00 / 33662

1200-1600 N MASON AVE

.0

10/05/07

11/20/07

0

0

0

9,150

8,044

Totals per Design/Engineering

.0

3,900 01/24/07

02/21/07

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 302

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 03 0029 / 4900

ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST

300 03 0029 / 4900

ON N MASON AVE FROM W FULLERTON AVE TO W ALTGELD ST

300 06 0122 / 5275

Fixtures 5.0

04/26/04

05/02/04

2,013 05/01/04

05/01/04

917

100

10.0

04/26/04

05/02/04

4,025 05/01/04

05/01/04

1,833

100

ON N MASON AVE FROM W THOMAS ST TO W DIVISION ST

5.0

07/17/03

07/18/03

2,075 06/17/03

06/17/03

1,823

100

300 07 0029 / 5452

ON N MASON AVE FROM W WEST END AVE TO W CORCORAN PL

8.0

04/18/06

11/18/06

3,200

302 00 0092 / 5774

ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST

4.0

0 07/10/01

07/11/01

302 00 0092 / 5774

ON N MASSASOIT AVE FROM W IOWA ST TO W AUGUSTA BLVD

4.0

0 07/10/01

302 00 0092 / 5774

ON N MENARD AVE FROM W CHICAGO AVE TO W IOWA ST

5.0

0 07/16/01

302 00 0092 / 5774

ON N MENARD AVE FROM W IOWA ST TO W AUGUSTA BLVD

5.0

300 06 0069 / 5233

ON N MENARD AVE FROM W MADISON ST TO W WASHINGTON BLVD

5.0

300 06 0069 / 5233

ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

5.0

05/13/02

300 03 0029 / 4900

ON N MENARD AVE FROM W NORTH AVE TO W WABANSIA AVE

10.0

04/26/04

302 00 0092 / 5774

ON N MENARD AVE FROM W WASHINGTON BLVD TO W WEST END AVE

6.0

300 03 0029 / 4900

ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST

9.0

302 00 0092 / 5774

ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST

302 00 0092 / 5774

0

0

824

100

07/11/01

824

100

07/18/01

1,030

100

0 07/16/01

07/18/01

1,030

100

0 05/08/02

05/08/02

1,875

100

05/13/02

1,050 05/10/02

05/10/02

1,015

100

05/02/04

4,025 05/01/04

05/01/04

1,834

100

0 12/17/01

12/17/01

1,218

100

3,775 05/25/04

05/25/04

1,824

100

3.0

0 07/10/01

07/11/01

618

100

ON N PARKSIDE AVE FROM W CHICAGO AVE TO W IOWA ST

4.0

0 07/10/01

07/11/01

824

100

302 00 0092 / 5774

ON N PARKSIDE AVE FROM W IOWA ST TO W AUGUSTA BLVD

4.0

0 07/10/01

07/11/01

824

100

300 07 0029 / 5452

ON N WALLER AVE FROM W AUGUSTA BLVD TO W DIVISION ST

9.0

302 00 0092 / 5774

ON N WALLER AVE FROM W CHICAGO AVE TO W IOWA ST

4.0

0 07/10/01

302 00 0092 / 5774

ON N WALLER AVE FROM W IOWA ST TO W AUGUSTA BLVD

5.0

302 00 0092 / 5774

ON N WALLER AVE FROM W MADISON ST TO W WASHINGTON BLVD

5.0

302 00 0092 / 5774

ON S MAYFIELD AVE FROM W FILLMORE ST TO W ROOSEVELT RD

302 00 0092 / 5774

06/01/04

04/18/06

06/02/04

11/18/06

3,800

0

0

07/11/01

824

100

0 07/10/01

07/11/01

1,030

100

0 12/12/01

12/12/01

1,029

100

5.0

0 12/18/01

12/18/01

1,029

100

ON W CONGRESS PKWY FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

0 07/21/01

07/25/01

4,116

100

302 00 0092 / 5774

ON W GLADYS AVE FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

0 07/21/01

07/25/01

4,116

100

300 06 0069 / 5233

ON W HURON ST FROM N CENTRAL AVE TO N MENARD AVE

8.0

07/06/02

07/06/02

1,680 07/03/02

07/03/02

1,624

100

300 07 0029 / 5452

ON W IOWA ST FROM N MENARD AVE TO N AUSTIN BLVD

8.0

04/18/06

11/18/06

3,200

302 00 0092 / 5774

ON W JACKSON BLVD FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

0 07/24/01

302 00 0092 / 5774

ON W MONROE ST FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

302 00 0092 / 5774

ON W QUINCY ST FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

300 07 0029 / 5452

ON W RICE ST FROM N MAYFIELD AVE TO N AUSTIN BLVD

300 07 0029 / 5452 302 00 0092 / 5774

0

0

07/24/01

7,086

100

0 07/21/01

07/25/01

4,116

100

0 07/21/01

07/25/01

4,116

100

01/05/07

0

100

5.0

04/18/06

11/18/06

2,200 01/05/07

ON W SUPERIOR ST FROM N MENARD AVE TO N AUSTIN BLVD

10.0

04/18/06

11/18/06

4,000

ON W VAN BUREN ST FROM S LARAMIE AVE TO S CENTRAL AVE

20.0

0 07/21/01

07/25/01

0

0

4,116

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 303

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 03 0029 / 4900

1100 N MAYFIELD AVE

6.0

06/01/04

06/02/04

2,450 05/25/04

05/25/04

1,422

100

302 00 0092 / 5774

1400 N MAYFIELD AVE

4.0

07/06/02

07/06/02

840 07/06/02

07/06/02

812

100

300 06 0069 / 5233

1700 N MAYFIELD AVE

5.0

04/28/03

04/28/03

1,875 05/01/03

05/01/03

987

100

210 06 0022 / 4297

2100-2199 N MEADE AVE

6.0

0 02/22/02

02/22/02

2,250

100

300 06 0069 / 5233

2100-2199 N MEADE AVE

6.0

2,250 02/22/02

02/22/02

2,250

100

302 00 0092 / 5774

600 N WALLER AVE

8.0

1,680 12/14/02

12/14/02

1,624

100

302 00 0092 / 5774

5000-5099 W CONGRESS PKWY

7.0

0 07/21/01

07/25/01

1,441

100

302 00 0092 / 5774

5900-5999 W ERIE ST

6.0

0 07/16/01

07/18/01

1,236

100

302 00 0092 / 5774

5510 W GLADYS AVE

5.0

1,015 01/30/02

01/30/02

1,050

100

302 00 0092 / 5774

5900 W HURON ST

6.0

0 07/16/01

07/18/01

1,236

100

302 00 0092 / 5774

5600-5699 W IOWA ST

3.0

0 07/10/01

07/11/01

618

100

302 00 0092 / 5774

5700-5799 W IOWA ST

2.0

0 07/10/01

07/11/01

412

100

302 00 0092 / 5774

5200-5299 W LEXINGTON ST

6.0

0 07/18/01

07/18/01

2,126

100

302 00 0092 / 5774

5900-5999 W OHIO ST

6.0

0 07/16/01

07/18/01

1,236

100

302 00 0092 / 5774

5000-5099 W VAN BUREN ST

7.0

0 12/17/01

12/17/01

1,421

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 07 0029 / 5452

ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD

Totals per Lighting/Electrical

12/14/02

02/02/02

12/14/02

02/02/02

354.0

45,153

71,636

Fixtures 35.0

10/23/06

01/04/07

14,000 10/23/06 3,663,768

01/04/07

0 2,074,586

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 304

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0725 / 6911

1642 N AUSTIN AVE

1.0

04/30/96

04/30/96

0 04/30/96

04/30/96

300

100

805 06 0741 / 6927

1718 N AUSTIN AVE

1.0

04/22/96

04/22/96

0 04/22/96

04/22/96

300

100

805 06 1749 / 7935

1719 N AUSTIN AVE

1.0

05/22/97

05/22/97

0 05/22/97

05/22/97

300

100

805 06 0835 / 7021

1738 N AUSTIN AVE

1.0

06/13/96

06/13/96

0 06/13/96

06/13/96

300

100

805 06 1827 / 8013

1016 N MASSASOIT AVE

1.0

06/16/96

06/16/96

0 06/16/96

06/16/96

300

100

805 06 1838 / 8024

1720 N MC VICKER AVE

1.0

01/30/97

01/30/97

0 01/30/97

01/30/97

300

100

805 06 1840 / 8026

1756 N MC VICKER AVE

1.0

04/30/96

04/30/96

0 04/30/96

04/30/96

300

100

805 06 1816 / 8002

1632 N MEADE AVE

1.0

04/30/96

04/30/96

0 04/30/96

04/30/96

300

100

805 06 1819 / 8005

1638 N MELVINA AVE

1.0

06/13/96

06/13/96

0 06/13/96

06/13/96

300

100

805 06 1821 / 8007

1716 N MELVINA AVE

1.0

01/31/97

01/31/97

0 01/31/97

01/31/97

300

100

805 06 1666 / 7852

2100 N MERRIMAC AVE

1.0

07/09/97

07/09/97

0 07/09/97

07/09/97

300

100

805 06 1948 / 8134

1615 N MOBILE AVE

1.0

05/01/96

05/01/96

0 05/01/96

05/01/96

300

100

805 06 1950 / 8136

2351 N MOBILE AVE

1.0

03/20/97

03/20/97

0 03/20/97

03/20/97

300

100

805 06 1878 / 8064

1838 N MULLIGAN AVE

1.0

01/31/97

01/31/97

0 01/31/97

01/31/97

300

100

805 06 1899 / 8085

1823 N NARRAGANSETT AVE

1.0

01/30/97

01/30/97

0 01/30/97

01/30/97

300

100

805 06 0403 / 6589

1538 N WALLER AVE

1.0

08/22/96

08/22/96

0 08/22/96

08/22/96

300

100

302 00 0092 / 5774

1021 S AUSTIN AVE

1.0

0 05/21/01

05/21/01

236

100

302 00 0092 / 5774

1041 S AUSTIN AVE

1.0

0 05/21/01

05/21/01

236

100

805 06 1974 / 8160

1041 S MONITOR AVE

1.0

10/10/96

10/10/96

0 10/10/96

10/10/96

300

100

805 06 1847 / 8033

5958 W CORTLAND ST

1.0

08/28/96

08/28/96

0 08/28/96

08/28/96

300

100

805 06 1114 / 7300

6301 W FULLERTON AVE

1.0

02/15/95

02/15/95

0 02/15/95

02/15/95

300

100

805 06 1122 / 7308

5959 W GRAND AVE

1.0

06/13/95

06/13/95

0 06/13/95

06/13/95

300

100

805 06 2006 / 8192

5944 W LAKE ST

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

300 06 0139 / 5289

5937 W MADISON ST

1,133.0

03/01/06

09/01/06

27,852 05/12/06

06/07/06

34,232

100

302 00 0092 / 5774

5937 W MADISON ST

24.0

0 03/15/01

09/24/01

5,656

100

805 06 1841 / 8027

5920 W MIDWAY PARK

1.0

11/15/95

11/15/95

0 11/15/95

11/15/95

300

100

805 06 0589 / 6775

5960 W NORTH AVE

1.0

05/15/96

05/15/96

0 05/15/96

05/15/96

300

100

805 06 2092 / 8278

6046 W NORTH AVE

1.0

10/11/96

10/11/96

0 10/11/96

10/11/96

300

100

805 06 0591 / 6777

6150 W NORTH AVE

1.0

10/02/96

10/02/96

0 10/02/96

10/02/96

300

100

805 06 0430 / 6616

5941 W WALTON ST

1.0

03/23/95

03/23/95

0 03/23/95

03/23/95

300

100

Totals per Alley Lighting/Lamps

1,185.0

27,852

48,160

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 305

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

5937 W MADISON ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5937 W MADISON ST

Work Type: Flood Light Install 300 06 0071 / 5234

500 S CENTRAL AVE

300 06 0167 / 5306

5900-6000 W ADAMS ST

300 06 0071 / 5234

6100 W FULLERTON AVE

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting 300 07 0029 / 5452

ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD

Work Type: Residential Regrouping 300 06 0270 / 5378

5253 W MADISON ST

Lamps 1,347.0

06/01/07

12/31/07

39,655 06/05/07

07/10/07

39,655

100

0 06/16/02

06/19/02

22,797

100

0 09/27/00

10/06/00

9,450

100

0 08/31/99

08/31/99

1,128

100

0

485

100

0

11,063

Installations 1,252.0

Fixtures 01/01/00

12/30/00

7.0 12/01/00

12/30/00

7.0

Fixtures 30.0

10/23/06

01/04/07

03/01/08

12/01/08

40,500 10/23/06

01/04/07

0

100

0

0

Lamps .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 306

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks 10/16/07

300 11 / 32218

ON N MASON AVE FROM W NORTH AVE TO W CORTLAND ST

3.0

300 09 / 33095

meade ele. Note Last Updated on 05-FEB-08 ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST

1.0

300 09 / 33095

ON N MASSASOIT AVE FROM W DIVISION ST TO W HIRSCH ST

2.0

130,000

300 09 / 33095

ON N MAYFIELD AVE FROM W NORTH AVE TO W CORTLAND ST

3.0

162,500

0

0

300 06 / 32275

ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

2.0

04/01/07

12/31/07

168,100 03/15/07

95,935

100

300 11 / 32218

ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

2.0

10/19/07

12/31/07

120,000

0

0

300 11 / 32218

meade ele. Note Last Updated on 05-FEB-08 ON N MONITOR AVE FROM W AUGUSTA BLVD TO W DIVISION ST

2.0

10/24/07

12/31/07

140,000

0

0

300 07 0029 / 5452

meade ele. Note Last Updated on 05-FEB-08 ON N MOODY AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

2.0

07/05/06

08/31/06

150,000 10/16/06

300 09 / 33095

ON N PARKSIDE AVE FROM W CHICAGO AVE TO W DIVISION ST

4.0

300 11 / 32218

ON N WALLER AVE FROM W DIVISION ST TO W HIRSCH ST

2.0

300 11 / 32218

meade ele. Note Last Updated on 05-FEB-08 ON W CONGRESS PKWY FROM S LAVERGNE AVE TO S LARAMIE AVE

2.0

300 11 / 32218

meade ele. Note Last Updated on 05-FEB-08 ON W CORTLAND ST FROM N MONITOR AVE TO N AUSTIN AVE

2.0

11/07/07

01/18/08

300 06 0298 / 5405

meade ele. Note Last Updated on 05-FEB-08 ON W ERIE ST FROM N AUSTIN BLVD TO N MENARD AVE

2.0

06/01/05

06/15/05

0 05/17/05

300 07 0029 / 5452

ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE

1.0

07/12/06

09/27/06

65,000 07/20/06

300 07 0029 / 5452

ON W HURON ST FROM N MENARD AVE TO N AUSTIN BLVD

2.0

07/26/06

09/29/06

170,000 11/01/06

300 11 / 32218

ON W HURON ST FROM N MENARD AVE TO N WALLER AVE

1.0

11/12/07

01/25/08

300 06 / 32277

meade ele. Note Last Updated on 05-FEB-08 ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE

.0

05/04/08

12/31/08

300 05 0029 / 5144

ON W MONROE ST FROM S LOCKWOOD AVE TO S LOTUS AVE

2.0

04/04/05

11/18/05

300 11 / 32218

ON W MONROE ST FROM S LOTUS AVE TO S CENTRAL AVE

1.0

11/14/07

01/25/08

60,000

300 05 0029 / 5144

meade ele. Note Last Updated on 05-FEB-08 ON W QUINCY ST FROM S LARAMIE AVE TO S LOCKWOOD AVE

1.0

04/04/05

11/18/05

85,000 07/20/05

300 06 / 32277

ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE

.0

05/04/08

12/31/08

0

300 11 / 32218

ON W SUPERIOR ST FROM N WALLER AVE TO N AUSTIN BLVD

3.0

11/16/07

01/31/08

190,000

300 06 0308 / 5414

meade ele. Note Last Updated on 05-FEB-08 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE

1.0

04/24/06

06/16/06

12/31/07

170,000 65,000 04/01/08

10/26/07

12/31/07

12/01/08

06/14/07

05/04/07

0

0

0

0

0

0

99,422

100

260,000

0

0

130,000

0

0

170,000

0

0

65,000

0

0

06/16/05

161,857

100

09/27/06

59,636

100

05/07/07

111,705

100

0

0

40,000 0 170,000 07/22/05

91,485 04/19/06

09/16/05

09/16/05

06/19/06

0

0

115,797

100

0

0

49,882

100

0

0

0

0

63,076

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 307

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 06 0308 / 5414

ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE

.26

03/16/06

12/31/06

18,588 06/07/06

08/01/06

11,291

100

300 07 0030 / 5453

ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE

1.0

06/12/06

08/18/06

75,000 06/07/06

08/15/06

51,456

100

281 00 / 33662

Project has been completed Note Last Updated on 25-AUG-06 1200-1600 N MASON AVE

4.0

12/07/07

03/19/08

0 12/07/07

03/21/08

218,545

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

46.26

2,695,673

1,038,601

Blocks

300 03 0029 / 4900

ON W OHIO ST FROM N AUSTIN BLVD TO N WALLER AVE

3.0

07/15/04

10/01/04

240,000 08/12/04

10/13/04

140,190

100

300 06 0267 / 5375

ON W QUINCY ST FROM S LOCKWOOD AVE TO S CENTRAL AVE

2.0

09/01/04

11/01/04

202,151 09/01/04

10/12/04

137,577

100

300 06 0122 / 5275

ON W RACE AVE FROM N MAYFIELD AVE TO N AUSTIN AVE

1.0

07/15/03

09/15/03

110,000 06/07/03

09/15/03

110,000

100

300 06 0235 / 5349

ON W RACE AVE FROM N WALLER AVE TO N AUSTIN AVE

3.0

07/15/03

10/01/03

155,000 06/07/03

09/15/03

126,300

100

Totals per Residntl Strt Lighting/Lamps

9.0

707,151

514,067

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 308

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

10 N MASON AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

44 N MASON AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

20 N MAYFIELD AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

44 N MAYFIELD AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

1300 N PARKSIDE AVE

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1314 N PARKSIDE AVE

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1324 N PARKSIDE AVE

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1338 N PARKSIDE AVE

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1352 N PARKSIDE AVE

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1007 S AUSTIN AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

1021 S AUSTIN AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

1041 S AUSTIN AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

140 S MASON AVE

1.0

0 01/18/01

01/18/01

378

100

302 00 0092 / 5774

1000 S MASON AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

930 S MENARD AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

1000 S MENARD AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

1030 S MENARD AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

1050 S MENARD AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

1036 S MONITOR AVE

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

1049 S MONITOR AVE

1.0

0 01/17/01

01/17/01

378

100

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting 300 04 0216 / 5114

ON N AUSTIN AVE FROM W NORTH AVE TO W CORTLAND ST

300 04 0216 / 5114 300 07 0029 / 5452

ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY AVE ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD

302 00 0077 / 5765

5626 W LAKE ST

Totals per Strt Light Pole Painting

20.0

0

7,560

Locations 22.0

05/01/06

11/01/06

4,758 05/17/06

06/12/06

4,758

100

15.50

05/01/06

11/01/06

3,353 05/17/06

11/01/06

3,353

100

65.0

10/23/06

01/04/07

14,500 10/23/06

01/04/07

0

100

0 07/26/99

07/27/99

786

100

9.0 111.50

22,611

8,897

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 309

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting 300 06 0268 / 5376

Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

Blocks

DE PRIEST CPS

50,000 02/10/04

08/10/04

113,047

100

Lamps

5937 W MADISON ST

1,949.0

Work Type: Underpass Lighting

Fixtures

06/01/06

12/31/06

11,000 10/12/06

10/17/06

10,134

100

805 06 2349 / 8535

2010 N AUSTIN AVE

118.0

08/04/95

08/04/95

0 08/04/95

08/04/95

88,500

100

805 06 2571 / 8757

430 N MAYFIELD AVE

14.0

11/01/93

11/01/93

0 11/01/93

11/01/93

10,500

100

805 06 2570 / 8756

430 N MENARD AVE

14.0

11/01/93

11/01/93

0 11/01/93

11/01/93

10,500

100

805 06 2569 / 8755

425 N PARKSIDE AVE

16.0

11/04/93

11/04/93

0 11/04/93

11/04/93

12,000

100

805 06 2568 / 8754

420 N WALLER AVE

14.0

10/05/93

10/05/93

0 10/05/93

10/05/93

10,500

100

805 06 2374 / 8560

995 S CENTRAL AVE

24.0

06/11/93

06/11/93

0 06/11/93

06/11/93

18,000

100

805 06 2375 / 8561

995 S CENTRAL AVE

6.0

06/11/93

06/11/93

0 06/11/93

06/11/93

4,500

100

805 06 2398 / 8584

995 S CENTRAL AVE

6.0

06/11/93

06/11/93

0 06/11/93

06/11/93

4,500

100

805 06 2715 / 8901

995 S CENTRAL AVE

24.0

06/11/93

06/11/93

0 06/11/93

06/11/93

18,000

100

300 06 0217 / 5337

5837 W MADISON ST

181.0

12/12/03

12/15/03

10,174 12/03/03

12/08/03

11,970

100

Totals per Underpass Lighting

417.0

10,174

188,970

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 310

1/1/2008 AND 12/31/2008

Ward 29 Isaac Carothers CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 / 32040

N AUSTIN BLVD AND W LAKE ST

Work Type: New Signal 300 06 0283 / 5391

N CENTRAL AVE AND W DIVISION ST

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W HARRISON ST AND S LARAMIE AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N MELVINA AVE AND W GRAND AVE

Work Type: Signals 300 06 0096 / 5258

5937 W MADISON ST

Work Type: TSM Install

Locations 1.0

11/01/06

12/31/07

85,000 11/01/06

03/06/07

0

100

09/02/04

09/30/04

8,159 09/09/04

09/09/04

8,159

100

03/15/06

05/08/07

6,000 12/26/06

02/13/07

2,959

100

4,000 08/01/01

08/07/01

12,864

100

Locations .50

Locations .0

Crossings 1.0

Intersections 47.0

11/01/03

11/08/03

0 11/01/03

11/07/03

7,432

100

Locations

814 06 0070 / 16286

300 N CENTRAL AVE

1.0

02/21/95

02/21/95

0 02/21/95

02/21/95

107,398

100

814 06 0384 / 16572

400 N CENTRAL AVE

1.0

03/11/96

03/11/96

0 03/11/96

03/11/96

250,000

100

814 06 0387 / 16575

1200 N CENTRAL AVE

1.0

04/10/96

04/10/96

0 04/10/96

04/10/96

125,000

100

3.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 07 0029 / 5452

ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD

Totals per Traffic

0

482,398

Locations 8.0

10/23/06

01/04/07

2,800 10/23/06

01/04/07

0

105,959

513,812

Totals per Construction Phase

3,769,726

2,588,398

Totals for Ward 29

3,778,876

2,596,442

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 311

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32275

ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE

.0

03/01/07

10/31/07

48,000 01/26/07

02/23/07

7,389

100

300 06 0274 / 5382

ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

1,784

100

300 06 0308 / 5414

ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,237

100

210 06 0208 / 4451

W ADDISON ST AND N LAWNDALE AVE

.0

07/01/04

10/01/04

0

210 06 0243 / 4480

W BELMONT AVE AND N MILWAUKEE AVE

.0

01/08/07

01/26/07

Totals per Design/Engineering

.0

250 01/08/07 48,250

01/26/07

0

0

638

100

12,047

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 312

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE

4.0

11/05/01

11/05/01

1,029 10/04/01

10/04/01

824

100

300 03 0030 / 4901

ON N AVERS AVE FROM W GRAND AVE TO W LE MOYNE ST

8.0

11/01/04

11/10/04

3,000 10/18/04

10/20/04

1,833

100

300 07 0030 / 5453

ON N AVERS AVE FROM W NORTH AVE TO W WABANSIA AVE

5.0

04/18/06

11/18/06

2,200 09/19/06

09/29/06

2,200

100

300 09 / 33096

ON N KEATING AVE FROM W BELMONT AVE TO W SCHOOL ST

4.0

10/13/08

10/14/08

1,600 10/13/08

10/14/08

1,245

100

300 11 / 32219

ON N KEELER AVE FROM W ARMITAGE AVE TO W PALMER ST

54.0

12/12/07

12/18/07

27,246 12/12/07

12/18/07

34,841

100

300 09 / 33096

ON N KENTON AVE FROM W ROSCOE ST TO W ADDISON ST

8.0

10/15/08

10/17/08

3,200 10/15/08

10/17/08

2,460

100

300 03 0030 / 4901

ON N KEYSTONE AVE FROM W CORTLAND ST TO W ARMITAGE AVE

5.0

07/20/04

07/20/04

2,075 07/23/04

07/23/04

1,125

100

300 03 0030 / 4901

ON N KEYSTONE AVE FROM W GRAND AVE TO W NORTH AVE

8.0

11/01/04

11/10/04

3,000 10/18/04

10/20/04

1,833

100

300 09 / 33096

ON N KOLMAR AVE FROM W SCHOOL ST TO W ADDISON ST

12.0

10/13/08

10/14/08

4,800 10/13/08

10/14/08

3,840

100

300 11 / 32219

ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST

10.0

12/12/07

12/18/07

1,677 12/12/07

12/18/07

1,677

100

300 03 0030 / 4901

ON N LOWELL AVE FROM W ROSCOE ST TO W ADDISON ST

9.0

11/01/04

11/10/04

3,375 10/18/04

10/20/04

2,062

100

300 07 0030 / 5453

ON N MANGO AVE FROM W DIVERSEY AVE TO W GEORGE ST

4.0

04/18/06

11/18/06

1,600

300 03 0029 / 4900

ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST

5.0

04/26/04

05/02/04

2,013 05/01/04

300 07 0030 / 5453

ON N MARMORA AVE FROM W GEORGE ST TO W BELMONT AVE

14.0

04/18/06

11/18/06

300 07 0030 / 5453

ON N MENARD AVE FROM W DIVERSEY AVE TO W BELMONT AVE

18.0

04/18/06

11/18/06

300 07 0030 / 5453

ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE

16.0

04/18/06

300 07 0030 / 5453

ON N SPRINGFIELD AVE FROM W DICKENS AVE TO W FULLERTON AVE

15.0

300 06 0069 / 5233

ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE

300 03 0030 / 4901

ON W DRUMMOND PL FROM N LONG AVE TO N CENTRAL AVE

300 07 0030 / 5453

0

0

917

100

5,700

0

0

7,400

0

0

11/18/06

6,600

0

0

04/18/06

11/18/06

6,200 09/14/06

09/29/06

0

100

2.64

10/01/03

10/16/03

0 02/04/02

02/04/02

990

100

8.0

11/01/04

11/10/04

3,000 10/18/04

10/20/04

1,833

100

ON W MELROSE ST FROM N CICERO AVE TO N LAVERGNE AVE

8.0

04/18/06

11/18/06

3,400 01/10/07

01/10/07

1,513

100

300 03 0030 / 4901

ON W PARKER AVE FROM N LONG AVE TO N CENTRAL AVE

7.0

11/01/04

11/10/04

2,825 10/18/04

10/20/04

1,604

100

300 03 0030 / 4901

ON W SCHUBERT AVE FROM N LONG AVE TO N CENTRAL AVE

8.0

11/01/04

11/10/04

3,200 10/18/04

10/20/04

1,833

100

300 06 0069 / 5233

ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE

6.0

2,250 01/14/03

01/14/03

2,250

100

300 06 0122 / 5275

N AVERS AVE AND W WELLINGTON AVE

4.0

12/04/03

12/04/03

1,700 12/08/03

12/08/03

975

100

300 06 0122 / 5275

N HAMLIN AVE AND W GEORGE ST

5.0

12/04/03

12/04/03

1,875 12/08/03

12/08/03

975

100

300 03 0030 / 4901

2700 N AVERS AVE

5.0

11/01/04

11/10/04

1,875 10/18/04

10/20/04

1,146

100

300 06 0069 / 5233

2928 N AVERS AVE

1.0

06/09/02

06/09/02

210 06/06/02

06/06/02

203

100

300 06 0069 / 5233

2948 N AVERS AVE

1.0

06/09/02

06/09/02

210 06/06/02

06/06/02

203

100

300 06 0069 / 5233

2852 N HAMLIN AVE

1.0

07/15/02

07/15/02

210 07/12/02

07/12/02

203

100

300 06 0069 / 5233

2900 N HAMLIN AVE

1.0

07/15/02

07/15/02

210 07/12/02

07/12/02

203

100

300 03 0030 / 4901

2700 N HARDING AVE

5.0

11/01/04

11/10/04

1,875 10/18/04

10/20/04

1,145

100

05/01/04

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 313

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

2932 N HARDING AVE

1.0

10/24/02

10/24/02

300 07 0030 / 5453

1800-1900 N KEYSTONE AVE

.0

03/01/06

12/31/06

300 03 0030 / 4901

3300 N KILBOURN AVE

4.0

11/01/04

11/10/04

1,500 10/18/04

300 03 0030 / 4901

3100 N MAJOR AVE

5.0

11/01/04

11/10/04

300 03 0030 / 4901

3100 N PARKSIDE AVE

5.0

11/01/04

11/10/04

300 03 0030 / 4901

1400 N SPRINGFIELD AVE

4.0

11/01/04

302 00 0092 / 5774

2500-2599 N SPRINGFIELD AVE

4.0

300 06 0069 / 5233

3850 W HIRSCH ST

300 09 / 33096 300 09 / 33096

210 10/21/02

10/21/02

203

100

0

0

10/20/04

917

100

1,875 10/18/04

10/20/04

1,146

100

1,875 10/18/04

10/20/04

1,145

100

11/10/04

1,500 10/18/04

10/20/04

917

100

11/02/01

11/02/01

1,029 10/04/01

10/04/01

824

100

1.0

11/04/02

11/04/02

210 11/01/02

11/01/02

203

100

4233 W SCHOOL ST

1.0

10/20/08

10/20/08

400 10/20/08

10/20/08

278

100

4245 W SCHOOL ST

1.0

10/20/08

10/20/08

400 10/20/08

10/20/08

278

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

287.64

0

114,554

75,844

Fixtures

300 09 / 33096

ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

12.0

10/27/08

10/31/08

4,800 10/27/08

10/31/08

3,984

100

300 09 / 33096

ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE

11.0

10/27/08

10/31/08

4,400 10/27/08

10/31/08

3,652

100

300 09 / 33096

ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE

17.40

10/27/08

11/01/07

6,960 10/27/08

11/01/07

6,647

100

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

63.0

04/04/05

11/18/05

25,200 07/10/05

08/01/05

22,050

100

300 11 / 32219

ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD

13.0

11/01/07

12/01/07

5,400 09/26/07

10/31/07

3,919

100

300 07 0030 / 5453

1800-1900 N KEYSTONE AVE

.0

03/01/06

12/31/06

300 06 0122 / 5275

4200 W NORTH AVE

3.0

06/01/03

06/02/03

Totals per 400 Watt Changeout Totals per Lighting/Electrical

119.40

0 4,800 05/13/03

05/13/03

0

0

3,647

100

51,560

43,899

1,678,639

1,911,405

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 314

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0092 / 5774

3402 N HAMLIN AVE

1.0

0 03/29/01

03/29/01

236

100

805 06 1055 / 7241

2422 N HARDING AVE

1.0

02/03/95

02/03/95

0 02/03/95

02/03/95

300

100

805 06 1056 / 7242

2726 N HARDING AVE

1.0

01/27/95

01/27/95

0 01/27/95

01/27/95

300

100

805 06 1076 / 7262

3629 N HARDING AVE

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 1717 / 7903

1701 N KARLOV AVE

1.0

06/19/97

06/19/97

0 06/19/97

06/19/97

300

100

805 06 1393 / 7579

3213 N KEATING AVE

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 1256 / 7442

3521 N KEATING AVE

1.0

05/20/96

05/20/96

0 05/20/96

05/20/96

300

100

805 06 1197 / 7383

1509 N KEDVALE AVE

1.0

11/27/96

11/27/96

0 11/27/96

11/27/96

300

100

805 06 1427 / 7613

1523 N KEDVALE AVE

1.0

11/27/96

11/27/96

0 11/27/96

11/27/96

300

100

805 06 1213 / 7399

1555 N KEDVALE AVE

1.0

11/27/96

11/27/96

0 11/27/96

11/27/96

300

100

805 06 1158 / 7344

1634 N KEELER AVE

1.0

04/04/95

04/04/95

0 04/04/95

04/04/95

300

100

805 06 1184 / 7370

3823 N KEYSTONE AVE

1.0

08/28/96

08/28/96

0 08/28/96

08/28/96

300

100

805 06 2024 / 8210

2125 N KOSTNER AVE

1.0

08/08/95

08/08/95

0 08/08/95

08/08/95

300

100

805 06 0564 / 6750

1518 N PULASKI RD

1.0

07/11/95

07/11/95

0 07/11/95

07/11/95

300

100

805 06 0565 / 6751

1916 N PULASKI RD

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

805 06 0566 / 6752

1936 N PULASKI RD

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

805 06 0567 / 6753

1956 N PULASKI RD

1.0

04/12/95

04/12/95

0 04/12/95

04/12/95

300

100

300 06 0139 / 5289

3616 N PULASKI RD

1,505.0

03/01/06

09/01/06

32,831 05/05/06

05/19/06

45,472

100

302 00 0092 / 5774

3618 N PULASKI RD

39.0

0 01/25/01

01/23/02

6,834

100

805 06 1778 / 7964

2170 N SPRINGFIELD AVE

1.0

04/17/97

04/17/97

0 04/17/97

04/17/97

300

100

805 06 0677 / 6863

2441 N SPRINGFIELD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0443 / 6629

1621 N TRIPP AVE

1.0

06/10/96

06/10/96

0 06/10/96

06/10/96

300

100

805 06 0786 / 6972

3732 W ADDISON ST

1.0

09/19/95

09/19/95

0 09/19/95

09/19/95

300

100

805 06 0787 / 6973

4008 W ADDISON ST

1.0

02/17/95

02/17/95

0 02/17/95

02/17/95

300

100

805 06 0771 / 6957

4129 W ADDISON ST

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 0790 / 6976

4599 W ADDISON ST

1.0

08/28/96

08/28/96

0 08/28/96

08/28/96

300

100

302 00 0092 / 5774

3840 W ALTGELD ST

1.0

0 04/24/01

04/24/01

236

100

805 06 1740 / 7926

5625 W DIVERSEY AVE

1.0

06/12/97

06/12/97

0 06/12/97

06/12/97

300

100

805 06 0807 / 6993

3915 W FULLERTON AVE

1.0

10/18/96

10/18/96

0 10/18/96

10/18/96

300

100

805 06 0788 / 6974

3925 W FULLERTON AVE

1.0

10/18/96

10/18/96

0 10/18/96

10/18/96

300

100

805 06 1229 / 7415

3955 W FULLERTON AVE

1.0

10/18/96

10/18/96

0 10/18/96

10/18/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 315

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1180 / 7366

3975 W FULLERTON AVE

1.0

10/18/96

10/18/96

0 10/18/96

10/18/96

300

100

300 06 0139 / 5289

5402 W FULLERTON AVE

1,410.0

03/01/06

09/01/06

30,775 04/17/06

05/01/06

42,602

100

805 06 1604 / 7790

4124 W NORTH AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1788 / 7974

4200 W NORTH AVE

1.0

11/12/91

11/12/91

0 11/12/91

11/12/91

300

100

805 06 1510 / 7696

4212 W NORTH AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1512 / 7698

4220 W NORTH AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 1800 / 7986

3917 W PALMER ST

1.0

04/14/97

04/14/97

0 04/14/97

04/14/97

300

100

805 06 1771 / 7957

3921 W PALMER ST

1.0

04/14/97

04/14/97

0 04/14/97

04/14/97

300

100

805 06 1772 / 7958

3925 W PALMER ST

1.0

04/14/97

04/14/97

0 04/14/97

04/14/97

300

100

805 06 1780 / 7966

3927 W PALMER ST

1.0

04/17/97

04/17/97

0 04/17/97

04/17/97

300

100

805 06 0642 / 6828

4235 W SCHOOL ST

1.0

10/12/95

10/12/95

0 10/12/95

10/12/95

300

100

805 06 1779 / 7965

3902 W SHAKESPEARE AVE

1.0

04/17/97

04/17/97

0 04/17/97

04/17/97

300

100

805 06 0652 / 6838

4346 W SHAKESPEARE AVE

1.0

08/08/95

08/08/95

0 08/08/95

08/08/95

300

100

2,995.0

Totals per Alley Lighting/Lamps

5402 W FULLERTON AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

107,080

Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

63,606

1,200.0

06/01/07

12/31/07

35,238 07/10/07

09/15/07

35,238

100

0 04/30/02

05/03/02

12,910

100

6.40

0 09/23/99

09/23/99

1,053

100

1.0

0 04/10/01

04/10/01

471

100

3.50

0 06/10/99

06/10/99

1,229

100

Installations

3618 N PULASKI RD

709.0

Fixtures

Work Type: Flood Light Install 300 06 0167 / 5306

ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST

302 00 0092 / 5774

N SPRINGFIELD AVE AND W SHAKESPEARE AVE

300 06 0167 / 5306

W DIVERSEY AVE AND N AVERS AVE

300 06 0069 / 5233

1435 N KARLOV AVE

2.0

970 07/11/02

07/11/02

1,432

100

300 06 0167 / 5306

1901 N KEELER AVE

1.0

0 12/01/99

12/01/99

351

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0122 / 5275

3811 W SCHOOL ST

13.90

970

4,535

Installations 1.0

10/15/03

10/16/03

4,600 10/17/03

10/17/03

1,764

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 316

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 09 / 33096

ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

21.0

12/19/08

12/31/08

28,350 12/19/08

12/31/08

28,400

100

300 09 / 33096

ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE

20.0

12/19/08

12/31/08

27,000 12/19/08

12/31/08

21,249

100

300 09 / 33096

ON W ARMITAGE AVE FROM N PULASKI RD TO N SPRINGFIELD AVE

5.0

11/20/08

11/26/08

6,750 11/20/08

11/26/08

6,800

100

300 09 / 33096

ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE

33.93

12/22/08

01/16/09

45,806 12/22/08

01/16/09

46,145

100

300 07 0030 / 5453

ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE

14.0

04/18/06

11/18/06

19,300

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

67.0

04/04/05

11/18/05

90,450 07/10/05

300 11 / 32219

ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD

13.0

11/01/07

12/01/07

17,550 09/26/07

300 07 0030 / 5453

1800-1900 N KEYSTONE AVE

.0

03/01/06

12/31/06

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting

173.93

.0

Work Type: Residential Regrouping

Lamps

300 06 0270 / 5378

3348 N MILWAUKEE AVE

Work Type: Residntl Staggered Lighting

.0

04/01/05

03/01/08

12/01/08

78,882

100

10/31/07

11,757

100

0

0

0

235,206

193,232

0 04/01/05

0

0

0

0

0

Blocks

300 05 0030 / 5145

KOSCIUSZKO (THADEUZ)

.0

04/01/05

300 06 / 32275

ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

04/01/07

12/31/07

300 11 / 32219

ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE

1.0

04/16/07

300 05 0030 / 5145

ON W SCHUBERT AVE FROM N CENTRAL AVE TO N MENARD AVE

2.0

08/10/05

300 06 0298 / 5405

ON W SCHUBERT AVE FROM N MENARD AVE TO N AUSTIN AVE

2.0

300 06 0308 / 5414

ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE

300 07 0030 / 5453

ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE

300 07 0030 / 5453

Project has been completed Note Last Updated on 25-AUG-06 1800-1900 N KEYSTONE AVE

Totals per Residntl Staggered Lighting

0

08/01/05

Blocks

KOSCIUSZKO (THADEUZ)

300 05 0030 / 5145

0

0 04/01/05

0

0

90,478

100

09/07/07

50,000

100

10/21/05

123,228

100

0 08/08/05

10/21/05

73,406

100

12/31/06

124,400 06/07/06

08/01/06

75,560

100

06/12/06

08/18/06

75,000 06/07/06

08/15/06

51,456

100

03/01/06

12/31/06

0

0

0

649,143

464,128

217,243 03/23/07

08/17/07

08/15/07

62,500 04/09/07

11/18/05

170,000 08/15/05

06/25/05

08/01/05

1.74

03/16/06

1.0 .0 9.74

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 317

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 06 0235 / 5349

ON N KILBOURN AVE FROM W ROSCOE ST TO W ADDISON ST

2.0

08/28/03

10/28/03

154,477 08/28/03

10/17/03

137,993

100

300 06 0267 / 5375

ON N LOTUS AVE FROM W FULLERTON AVE TO W ALTGELD ST

2.0

05/20/04

07/20/04

146,035 06/02/04

09/16/04

127,621

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

4.0

300,512

265,614

Locations

302 00 0092 / 5774

1900 N TRIPP AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

1910 N TRIPP AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

1922 N TRIPP AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

1940 N TRIPP AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

1948 N TRIPP AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

5733 W DIVERSEY AVE

1.0

0 02/01/01

02/01/01

378

100

302 00 0092 / 5774

5734 W DIVERSEY AVE

1.0

0 02/01/01

02/01/01

378

100

302 00 0092 / 5774

5737 W DIVERSEY AVE

1.0

0 04/20/01

04/20/01

378

100

302 00 0092 / 5774

4300 W SHAKESPEARE AVE

1.0

0 04/10/01

04/10/01

378

100

302 00 0092 / 5774

4324 W SHAKESPEARE AVE

1.0

0 04/10/01

04/10/01

378

100

302 00 0092 / 5774

4336 W SHAKESPEARE AVE

1.0

0 04/10/01

04/10/01

378

100

302 00 0092 / 5774

4352 W SHAKESPEARE AVE

1.0

0 04/10/01

04/10/01

378

100

Totals per Short Arm Installs - Residntl

12.0

0

4,536

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 318

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 09 / 33096

ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

21.0

10/23/08

10/28/08

6,300 10/23/08

10/28/08

4,410

100

300 09 / 33096

ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE

20.0

10/20/08

10/23/08

6,000 10/20/08

10/23/08

4,200

100

302 00 0076 / 5764

ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE

31.16

09/01/00

12/31/00

300 09 / 33096

ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST

3.50

0

0

300 09 / 33096

ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE

30.45

10/27/08

10/31/08

9,135 10/27/08

10/31/08

7,856

100

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

96.50

04/04/05

11/18/05

24,125 06/27/05

07/15/05

15,000

100

302 00 0076 / 5764

ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE

50.0

09/01/00

12/31/00

300 11 / 32219

ON W NORTH AVE FROM N HAMLIN AVE TO N LOWELL AVE

50.0

06/10/07

07/10/07

302 00 0076 / 5764

ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE

69.66

09/01/00

12/31/00

300 11 / 32219

ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD

13.0

07/10/07

08/01/07

300 07 0030 / 5453

1800-1900 N KEYSTONE AVE

.0

03/01/06

12/31/06

300 06 0108 / 5263

4200 W NORTH AVE

3.0

05/21/03

05/21/03

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0098 / 5259

1800-2300 N PULASKI RD

Work Type: Strt Lighting 300 06 0274 / 5382

ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE

Work Type: Traffic Signal Regrouping

0

530

700

388.27

0 11,000 06/10/07

850 07/10/07

0 3,250 07/10/07

100

1,184 08/01/07

0 750 07/01/03

11,000

07/03/03

61,260

3,250

100

0

0

630

100

48,910

Blocks 5.0

04/01/01

01/15/03

0 04/16/01

06/15/02

515,969

100

06/20/06

08/31/06

75,000 06/20/06

08/31/06

30,628

100

Blocks 1.0

Lamps

300 06 0139 / 5289

3616 N PULASKI RD

774.0

03/01/04

12/01/04

4,024 10/18/06

10/19/06

8,429

100

300 06 0238 / 5352

NEW WARD ADDRESS IS 3348 N. MILWAUKEE Note Last Updated on 30-OCT-06 5402 W FULLERTON AVE 1,522.0

06/01/06

12/31/06

8,500 10/19/06

10/23/06

7,914

100

Totals per Traffic Signal Regrouping

2,296.0

12,524

16,343

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 319

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2639 / 8825

1895 N KARLOV AVE

8.0

10/25/94

10/25/94

0 10/25/94

10/25/94

6,000

100

805 06 2917 / 9103

1893 N KEELER AVE

12.0

03/16/94

03/16/94

0 03/16/94

03/16/94

9,000

100

805 06 2638 / 8824

1895 N KILDARE AVE

8.0

12/20/94

12/20/94

0 12/20/94

12/20/94

6,000

100

300 06 0117 / 5271

2300 N PULASKI RD

302 00 0072 / 5760

2300 N PULASKI RD

1.0

0 03/09/00

03/15/00

7,626

100

300 06 0217 / 5337

3616 N PULASKI RD

395.0

12/16/03

12/19/03

22,202 01/28/04

02/06/04

23,423

100

805 06 2752 / 8938

1898 N SPRINGFIELD AVE

10.0

06/29/94

06/29/94

0 06/29/94

06/29/94

7,500

100

805 06 2358 / 8544

1890 N TRIPP AVE

8.0

06/04/96

06/04/96

0 06/04/96

06/04/96

6,000

100

302 00 0071 / 5759

3850 W ARMITAGE AVE

0 10/17/98

10/22/98

3,492

100

805 06 2654 / 8840

3899 W ARMITAGE AVE

4.0

05/08/92

05/08/92

0 05/08/92

05/08/92

3,000

100

805 06 2633 / 8819

3925 W DICKENS AVE

8.0

12/14/94

12/14/94

0 12/14/94

12/14/94

6,000

100

805 06 2659 / 8845

4565 W ROSCOE ST

4.0

04/19/93

04/19/93

0 04/19/93

04/19/93

3,000

100

805 06 2207 / 8393

4001 W WRIGHTWOOD AVE

10.0

12/31/95

12/31/95

0 12/31/95

12/31/95

7,500

100

Totals per Underpass Lighting

12.0

480.0

52,265

74,467

2,235

90,776

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 320

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Locations

Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305

4100 W GRAND AVE

1.0

03/15/01

04/15/01

15,000 06/13/01

06/15/01

11,165

100

Locations

Work Type: LED Signal Head Install 210 06 0130 / 4389

N KEELER AVE AND W ARMITAGE AVE

1.0

0 02/26/02

02/26/02

7,324

90

210 06 0130 / 4389

N PULASKI RD AND W ARMITAGE AVE

1.0

0 02/26/02

02/26/02

10,074

100

2.0

0

Totals per LED Signal Head Install

17,398

Locations

Work Type: Left Turn Arrow 210 06 / 32040

N CENTRAL AVE AND W DIVERSEY AVE

.0

11/01/06

12/31/07

42,500

0

0

210 06 0257 / 4493

N CENTRAL AVE AND W FULLERTON AVE

.50

09/15/06

08/20/07

58,700 01/17/07

04/17/07

0

100

210 06 0256 / 4492

No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07 Awaiting ADA work. Note Last Updated on 21-JUN-07 W BELMONT AVE AND N CENTRAL AVE

.50

09/01/05

06/30/07

61,036 01/02/07

10/19/07

0

100

210 06 0073 / 4337

Awaiting ADA work. Note Last Updated on 21-JUN-07 1600 N PULASKI RD

1.0

06/13/02

09/01/02

50,000 06/13/02

02/07/03

60,838

100

Totals per Left Turn Arrow

Work Type: New Signal

2.0

212,236

Locations

210 06 0208 / 4451

W ADDISON ST AND N LAWNDALE AVE

.50

12/01/05

06/30/06

210 06 0131 / 4390

W FULLERTON AVE AND N AVERS AVE

.50

07/01/01

12/01/01

1.0

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W BELMONT AVE AND N MILWAUKEE AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N KOSTNER AVE AND W PALMER BLVD

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

3616 N PULASKI RD

60,838

112,500 85,000 05/31/01

0 08/02/01

197,500

47,668

100

47,668

Locations .0

03/15/06

05/08/07

6,000 01/12/07

02/13/07

4,070

100

2,000 07/20/01

04/08/02

527

100

0 11/04/03

11/10/03

7,748

100

Crossings .50

Intersections 49.0

11/15/03

11/21/03

590,586

692,094

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 321

1/1/2008 AND 12/31/2008

Ward 30 Ariel E. Reboyras CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

814 06 0341 / 16539

2800 N HAMLIN AVE

1.0

04/15/97

04/15/97

0 04/15/97

12/15/97

129,900

100

210 06 0072 / 4336

3200 N KILPATRICK AVE

1.0

06/06/00

10/10/00

150,000 06/06/00

10/10/00

95,170

100

814 06 0383 / 16571

3600 N PULASKI RD

1.0

09/19/96

09/19/96

0 09/19/96

09/19/96

123,824

100

814 06 0312 / 16524

3850 N PULASKI RD

1.0

11/21/91

11/21/91

0 11/21/91

11/21/91

106,875

100

814 06 0125 / 16339

3869 N PULASKI RD

1.0

10/29/93

10/29/93

0 10/29/93

10/29/93

79,020

100

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 07 0030 / 5453

ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

300 07 0030 / 5453

1800-1900 N KEYSTONE AVE

150,000

534,789

Locations 0

0

7,892

100

0

0

0

7,850

7,892

Totals per Construction Phase

2,269,224

2,603,499

Totals for Ward 30

2,317,474

2,615,546

Totals per Traffic Equipment Painting

1.50

04/18/06

11/18/06

20.50

04/04/05

11/18/05

.0

03/01/06

12/31/06

22.0

300 7,550 06/27/05

07/15/05

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 322

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE

2.0

04/01/08

08/30/08

130,000 05/19/08

300 06 0308 / 5414

ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE

.0

02/01/06

07/31/06

0 02/01/06

300 06 / 32277

ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE

2.0

04/01/08

08/30/08

130,000 05/19/08

300 06 0274 / 5382

ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE

.0

07/01/04

12/31/04

210 06 0243 / 4480

W BELMONT AVE AND N MILWAUKEE AVE

.0

01/08/07

01/26/07

300 06 0292 / 5399

1833 N CICERO AVE

210 06 0127 / 4386

4640 W DIVERSEY AVE

300 06 0292 / 5399

4821 W FULLERTON AVE

Totals per Design/Engineering

1.0

0

20

07/31/06

354

100

0

20

0 03/22/05

05/06/05

818

100

250 01/08/07

01/26/07

638

100

2,500 03/30/05

05/01/05

0

100

.0

12/15/05

03/15/06

0 12/15/05

02/16/06

1,275

100

1.0

02/23/05

03/04/05

1,000 01/20/05

05/19/05

1,000

100

6.0

263,750

4,085

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 323

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 11 / 32219

ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST

10.0

12/12/07

12/18/07

1,677 12/12/07

12/18/07

1,677

100

300 06 0069 / 5233

ON W SHAKESPEARE AVE FROM N LAMON AVE TO N CICERO AVE

5.0

03/17/03

03/17/03

2,000 03/14/03

03/14/03

1,875

100

300 06 0069 / 5233

ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE

6.0

2,250 01/14/03

01/14/03

2,250

100

300 06 0069 / 5233

2200 N KENNETH AVE

5.0

1,050 04/25/02

04/25/02

1,015

100

302 00 0092 / 5774

3100-3199 N KENOSHA AVE

8.0

0 09/28/01

09/28/01

1,646

100

300 06 0069 / 5233

2600 N KILBOURN AVE

8.0

06/07/02

06/07/02

1,680 06/04/02

06/04/02

1,624

100

300 06 0069 / 5233

2000 N LAWLER AVE

5.0

01/10/02

01/10/02

1,050 01/07/02

01/07/02

1,015

100

300 06 0069 / 5233

2458 N LOWELL AVE

1.0

11/04/02

11/04/02

210 11/01/02

11/01/02

203

100

300 06 0069 / 5233

4353 W ALTGELD ST

1.0

11/04/02

11/04/02

210 11/01/02

11/01/02

203

100

300 06 0069 / 5233

4502 W FULLERTON AVE

894.0

350,000 04/18/03

06/30/03

197,004

100

300 06 0122 / 5275

4502 W FULLERTON AVE

604.0

07/01/03

08/01/03

238,250 05/10/03

06/30/03

130,493

100

300 06 0069 / 5233

4800 W WOLFRAM ST

5.0

04/29/02

04/29/02

1,050 04/25/02

04/25/02

1,015

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

04/29/02

04/29/02

1,552.0

599,427

340,020

Fixtures

300 06 0122 / 5275

ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE

171.0

06/11/04

06/16/04

68,400 05/25/04

06/21/04

68,400

100

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

38.50

04/04/05

11/18/05

15,400 07/10/05

08/01/05

13,475

100

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

63.0

04/04/05

11/18/05

25,200 07/10/05

08/01/05

22,050

100

300 03 0031 / 4902

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

91.50

05/18/04

05/25/04

36,600 05/15/04

06/01/04

34,037

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

364.0

145,600

137,962

2,156,355

1,679,392

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 324

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0840 / 7026

2811 N CENTRAL AVE

1.0

03/10/95

03/10/95

0 03/10/95

03/10/95

300

100

805 06 1758 / 7944

2940 N CICERO AVE

1.0

05/09/97

05/09/97

0 05/09/97

05/09/97

300

100

805 06 1759 / 7945

2958 N CICERO AVE

1.0

05/09/97

05/09/97

0 05/09/97

05/09/97

300

100

805 06 1738 / 7924

3002 N CICERO AVE

1.0

06/12/97

06/12/97

0 06/12/97

06/12/97

300

100

805 06 0416 / 6602

3032 N CICERO AVE

1.0

08/05/96

08/05/96

0 08/05/96

08/05/96

300

100

805 06 1760 / 7946

3056 N CICERO AVE

1.0

05/09/97

05/09/97

0 05/09/97

05/09/97

300

100

805 06 0332 / 6518

3134 N DAVLIN CT

1.0

05/04/95

05/04/95

0 05/04/95

05/04/95

300

100

805 06 1382 / 7568

2332 N KEATING AVE

1.0

08/12/96

08/12/96

0 08/12/96

08/12/96

300

100

805 06 1196 / 7382

2034 N KENNETH AVE

1.0

04/01/96

04/01/96

0 04/01/96

04/01/96

300

100

805 06 1166 / 7352

2054 N KENNETH AVE

1.0

06/19/96

06/19/96

0 06/19/96

06/19/96

300

100

302 00 0092 / 5774

3157 N KENOSHA AVE

1.0

0 09/29/01

09/29/01

236

100

805 06 2028 / 8214

2635 N KILDARE AVE

1.0

04/05/95

04/05/95

0 04/05/95

04/05/95

300

100

805 06 2008 / 8194

2233 N KOSTNER AVE

1.0

09/29/95

09/29/95

0 09/29/95

09/29/95

300

100

805 06 1996 / 8182

3015 N KOSTNER AVE

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 2017 / 8203

3215 N KOSTNER AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 1998 / 8184

3257 N KOSTNER AVE

1.0

06/02/95

06/02/95

0 06/02/95

06/02/95

300

100

805 06 1961 / 8147

2937 N LONG AVE

1.0

04/03/96

04/03/96

0 04/03/96

04/03/96

300

100

805 06 1859 / 8045

2839 N LUNA AVE

1.0

04/03/96

04/03/96

0 04/03/96

04/03/96

300

100

805 06 1860 / 8046

2858 N LUNA AVE

1.0

01/25/96

01/25/96

0 01/25/96

01/25/96

300

100

805 06 1743 / 7929

4521 W ARMITAGE AVE

1.0

05/21/97

05/21/97

0 05/21/97

05/21/97

300

100

805 06 1744 / 7930

4531 W ARMITAGE AVE

1.0

05/21/97

05/21/97

0 05/21/97

05/21/97

300

100

805 06 1745 / 7931

4551 W ARMITAGE AVE

1.0

05/21/97

05/21/97

0 05/21/97

05/21/97

300

100

302 00 0092 / 5774

4502 W FULLERTON AVE

30.0

0 01/25/01

10/31/01

7,070

100

805 06 1112 / 7298

4616 W FULLERTON AVE

1.0

08/10/95

08/10/95

0 08/10/95

08/10/95

300

100

805 06 1651 / 7837

4821 W MEDILL AVE

1.0

07/29/97

07/29/97

0 07/29/97

07/29/97

300

100

805 06 1929 / 8115

5038 W NELSON ST

1.0

09/06/96

09/06/96

0 09/06/96

09/06/96

300

100

805 06 0634 / 6820

4344 W SCHOOL ST

1.0

08/07/95

08/07/95

0 08/07/95

08/07/95

300

100

805 06 0618 / 6804

5021 W SCHUBERT AVE

1.0

03/14/96

03/14/96

0 03/14/96

03/14/96

300

100

805 06 0619 / 6805

5301 W SCHUBERT AVE

1.0

12/03/96

12/03/96

0 12/03/96

12/03/96

300

100

805 06 0537 / 6723

4819 W WELLINGTON AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

300

100

805 06 0471 / 6657

4635 W WRIGHTWOOD AVE

1.0

02/02/95

02/02/95

0 02/02/95

02/02/95

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 325

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

4502 W FULLERTON AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4502 W FULLERTON AVE

Work Type: Flood Light Install

Installations 60.0

0

16,006

Lamps 1,016.0

06/01/07

12/31/07

29,911 08/18/07

01/15/08

29,911

100

0 05/24/02

05/27/02

16,770

100

Installations 921.0

Fixtures

300 06 0167 / 5306

ON N KEATING AVE FROM W DIVERSEY AVE TO W BELMONT AVE

14.0

0 09/24/99

09/24/99

2,444

100

300 06 0167 / 5306

ON N KILPATRICK AVE FROM W DIVERSEY AVE TO W BARRY AVE

9.0

0 09/24/99

09/24/99

1,504

100

302 00 0092 / 5774

W BELDEN AVE AND N LA CROSSE AVE

1.0

0 04/04/01

04/04/01

471

100

300 06 0167 / 5306

2800 N KEATING AVE

1.0

0 09/24/99

09/24/99

351

100

300 06 0167 / 5306

2900 N KEATING AVE

1.0

0 09/04/99

09/24/99

351

100

300 06 0167 / 5306

3000 N KEATING AVE

1.0

0 09/24/99

09/24/99

351

100

300 06 0167 / 5306

2800 N KILPATRICK AVE

1.0

0 09/27/99

09/27/99

351

100

300 06 0167 / 5306

2900 N KILPATRICK AVE

1.0

0 09/27/99

09/27/99

351

100

300 06 0167 / 5306

3000 N KILPATRICK AVE

1.0

0 09/27/99

09/27/99

351

100

300 06 0167 / 5306

3222 N KOSTNER AVE

1.0

0 09/03/99

09/03/99

351

100

302 00 0092 / 5774

2248 N LAMON AVE

1.0

0 05/09/01

05/09/01

471

100

300 06 0167 / 5306

4220 W BARRY AVE

1.0

0 04/17/99

04/17/99

351

100

302 00 0092 / 5774

4816 W BARRY AVE

1.0

0 02/06/01

02/06/01

471

100

302 00 0092 / 5774

4802 W MONTANA ST

1.0

0 02/14/01

02/14/01

471

100

302 00 0092 / 5774

4010 W NELSON ST

1.0

0 02/08/01

02/08/01

471

100

302 00 0092 / 5774

4340 W WELLINGTON AVE

1.0

0 05/01/01

05/01/01

471

100

302 00 0092 / 5774

4352 W WELLINGTON AVE

1.0

0 05/01/01

05/01/01

471

100

302 00 0092 / 5774

4802 W WOLFRAM ST

1.0

0 02/01/01

02/01/01

471

100

Totals per Flood Light Install

39.0

0

10,524

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 326

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts

Installations

300 06 0292 / 5399

1833 N CICERO AVE

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

300 06 0292 / 5399

4821 W FULLERTON AVE

.0

03/01/05

12/31/05

0 06/27/05

06/27/05

0

100

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

.0

0

0

Fixtures

300 06 0122 / 5275

ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE

135.0

06/16/04

06/30/04

182,250 06/11/04

07/07/04

113,051

100

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

31.0

04/04/05

11/18/05

41,850 07/10/05

07/15/05

26,500

100

300 09 / 33097

ON W ARMITAGE AVE FROM N KOSTNER AVE TO W GRAND AVE

46.0

07/07/08

08/01/08

62,700 06/27/08

07/07/08

47,358

100

300 07 0030 / 5453

ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE

14.0

04/18/06

11/18/06

19,300

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

67.0

04/04/05

11/18/05

90,450 07/10/05

300 03 0031 / 4902

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

77.0

05/26/04

06/10/04

103,950 05/25/04

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

4502 W FULLERTON AVE

Work Type: Residntl Staggered Lighting

370.0

78,882

100

07/07/04

81,642

100

347,433

0

0

Lamps .0

03/01/08

12/01/08

0

Blocks

ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE

.0

05/04/08

12/31/08

300 06 0308 / 5414

ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE

1.0

08/25/06

10/25/06

300 06 / 32277

ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON W GEORGE ST FROM N LAMON AVE TO N LAVERGNE AVE

1.0

06/30/05

08/01/05

300 06 0298 / 5405

ON W WOLFRAM ST FROM N LAMON AVE TO N LAVERGNE AVE

1.0

06/30/05

08/01/05

300 09 / 33097

ON W WOLFRAM ST FROM N LAVERGNE AVE TO N LARAMIE AVE

1.0 4.0

214,842

Work Type: Residntl Strt Lighting/Lamps

0

08/01/05

500,500

300 06 / 32277

Totals per Residntl Staggered Lighting

0

0

0

0

04/27/07

20,179

100

0

0

0 08/08/05

10/07/05

58,082

100

0 08/08/05

10/07/05

58,082

100

130,000 04/01/08

12/01/08

0

0

84,842 09/05/06

136,343

Blocks

300 06 0235 / 5349

ON W DRUMMOND PL FROM N CICERO AVE TO N LAVERGNE AVE

2.0

08/01/03

10/01/03

159,534 07/31/03

10/17/03

144,080

100

300 06 0267 / 5375

ON W GEORGE ST FROM N CICERO AVE TO N LAMON AVE

1.0

09/27/04

11/27/04

97,526 10/04/04

11/17/04

63,482

100

300 06 0267 / 5375

ON W WOLFRAM ST FROM N CICERO AVE TO N LAMON AVE

1.0

09/15/04

11/15/04

97,526 10/04/04

11/17/04

63,483

100

Totals per Residntl Strt Lighting/Lamps

4.0

354,586

271,045

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 327

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

W BELDEN AVE AND N LAMON AVE

1.0

0 06/01/01

06/01/01

378

100

302 00 0092 / 5774

3000 N KARLOV AVE

1.0

0 04/10/01

04/10/01

378

100

302 00 0092 / 5774

3001 N KARLOV AVE

1.0

0 02/08/01

02/08/01

378

100

302 00 0092 / 5774

3101 N KARLOV AVE

1.0

0 02/08/01

02/08/01

378

100

302 00 0092 / 5774

2300 N KILPATRICK AVE

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

2210 N LA CROSSE AVE

1.0

0 04/03/01

04/03/01

378

100

302 00 0092 / 5774

2226 N LA CROSSE AVE

1.0

0 04/03/01

04/03/01

378

100

302 00 0092 / 5774

2242 N LA CROSSE AVE

1.0

0 04/03/01

04/03/01

378

100

302 00 0092 / 5774

2250 N LAMON AVE

1.0

0 06/01/01

06/01/01

378

100

302 00 0092 / 5774

4816 W BARRY AVE

1.0

0 02/01/01

02/01/01

378

100

302 00 0092 / 5774

4900 W DEMING PL

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

5100 W DEMING PL

1.0

0 03/14/01

03/14/01

378

100

302 00 0092 / 5774

4002 W NELSON ST

1.0

0 02/08/01

02/08/01

378

100

302 00 0092 / 5774

4030 W NELSON ST

1.0

0 04/10/01

04/10/01

378

100

302 00 0092 / 5774

4100 W NELSON ST

1.0

0 02/08/01

02/08/01

378

100

302 00 0092 / 5774

5055 W WRIGHTWOOD AVE

1.0

0 03/01/01

03/01/01

378

100

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

16.0

0

6,048

Locations

300 03 0031 / 4902

ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE

6.0

06/04/04

06/28/04

1,425 05/25/04

06/20/04

0

100

300 06 0108 / 5263

ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE

194.0

06/04/04

06/28/04

55,325 05/25/04

06/30/04

44,136

100

302 00 0077 / 5765

ON N CICERO AVE FROM W BARRY AVE TO W GRAND AVE

160.0

0 07/06/99

07/23/99

13,979

100

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

31.0

04/04/05

11/18/05

7,750 06/27/05

07/15/05

6,324

100

302 00 0076 / 5764

ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE

6.84

09/01/00

12/31/00

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

96.50

04/04/05

11/18/05

302 00 0076 / 5764

ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE

50.0

09/01/00

12/31/00

300 03 0031 / 4902

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

101.0

05/10/04

06/04/04

302 00 0076 / 5764

ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE

1.62

09/01/00

12/31/00

Totals per Strt Light Pole Painting

646.96

0 24,125 06/27/05

116 07/15/05

0 27,425 05/10/04

15,000

100

850 06/04/04

24,084

0

28

116,050

104,517

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 328

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting

Blocks

300 06 0297 / 5404

KELVYN PARK CPS

1.0

300 06 0274 / 5382

ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE

2.0

300 06 0204 / 5327

3100 N KENOSHA AVE

4.0

12/01/03

10/17/01

12/31/04

10/17/01

7.0

Totals per Strt Lighting

Work Type: Underpass Lighting

28,973 06/23/03

06/25/04

28,973

100

150,000 10/13/04

12/01/04

119,418

100

840 09/29/01

09/29/01

1,029

100

179,813

149,420

Fixtures

805 06 2111 / 8297

1805 N KOSTNER AVE

8.0

03/16/94

03/16/94

0 03/16/94

03/16/94

6,000

100

805 06 2921 / 9107

4695 W ARMITAGE AVE

4.0

03/02/94

03/02/94

0 03/02/94

03/02/94

3,000

100

805 06 2908 / 9094

4300 W BELMONT AVE

4.0

12/09/93

12/09/93

0 12/09/93

12/09/93

3,000

100

805 06 2660 / 8846

4625 W BELMONT AVE

4.0

04/19/93

04/19/93

0 04/19/93

04/19/93

3,000

100

805 06 2661 / 8847

4699 W DIVERSEY AVE

4.0

04/19/93

04/19/93

0 04/19/93

04/19/93

3,000

100

805 06 2632 / 8818

4001 W FULLERTON AVE

6.0

05/02/92

05/02/92

0 05/02/92

05/02/92

4,500

100

302 00 0071 / 5759

4030 W FULLERTON AVE

0 10/24/98

10/29/98

8,146

100

300 06 0217 / 5337

4502 W FULLERTON AVE

278.0

08/20/04

08/31/04

15,626 04/12/04

04/16/04

14,972

100

805 06 2919 / 9105

4569 W FULLERTON AVE

4.0

05/07/92

05/07/92

0 05/07/92

05/07/92

3,000

100

302 00 0071 / 5759

4600 W FULLERTON AVE

0 10/28/98

11/05/98

8,146

100

805 06 2257 / 8443

4698 W GRAND AVE

26.0

09/02/96

09/02/96

0 09/02/96

09/02/96

19,500

100

805 06 2918 / 9104

4860 W GRAND AVE

10.0

03/20/94

03/20/94

0 03/20/94

03/20/94

7,500

100

302 00 0070 / 5758

4100 W WRIGHTWOOD AVE

0 10/31/97

11/07/97

10,130

100

805 06 2103 / 8289

4100 W WRIGHTWOOD AVE

16.0

11/07/97

11/07/97

0 11/07/97

11/07/97

12,000

100

805 06 2656 / 8842

4598 W WRIGHTWOOD AVE

10.0

12/14/94

12/14/94

0 12/14/94

12/14/94

7,500

100

Totals per Underpass Lighting

374.0

15,626

113,394

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 329

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305

4800 W DICKENS AVE

Work Type: Left Turn Arrow

Locations 1.0

10/27/00

10/30/00

15,000 10/27/00

10/30/00

17,592

100

0

0

11/16/05

93,454

100

Locations

210 06 / 32040

N CENTRAL AVE AND W DIVERSEY AVE

.0

11/01/06

12/31/07

42,500

210 06 0222 / 4462

W ARMITAGE AVE AND N CICERO AVE

1.0

10/01/05

11/01/05

68,000 06/27/05

210 06 0073 / 4337

2800 N CICERO AVE

1.0

04/15/03

05/13/03

77,316 04/14/03

79,824

95

210 06 0127 / 4386

4640 W DIVERSEY AVE

1.0

11/01/06

12/01/06

75,000 01/16/07

26,078

75

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0073 / 4337

2400 N PULASKI RD

Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480

W BELMONT AVE AND N MILWAUKEE AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N KOSTNER AVE AND W PALMER BLVD

Work Type: Signals 300 06 0096 / 5258

4502 W FULLERTON AVE

Work Type: TSM Install

3.0

262,816

199,356

Locations 1.0

11/15/02

01/15/03

150,000 09/12/02

01/30/03

204,580

100

03/15/06

05/08/07

6,000 01/12/07

02/13/07

4,070

100

2,000 07/20/01

04/08/02

527

100

0 11/05/03

11/12/03

4,427

100

Locations .0

Crossings .50

Intersections 28.0

11/15/03

11/21/03

Locations

300 06 0078 / 5241

N LAMON AVE AND W FULLERTON AVE

1.0

11/01/02

01/31/03

25,000 11/02/02

12/03/02

25,000

100

210 06 0010 / 4285

2800 N KILBOURN AVE

1.0

08/01/98

12/01/98

150,000 08/03/98

10/19/99

108,833

100

814 06 0360 / 16554

2200 N PULASKI RD

1.0

08/01/96

08/01/96

0 08/01/96

03/26/97

126,851

100

814 06 0076 / 16292

4640 W DIVERSEY AVE

1.0

12/19/90

12/19/90

0 12/19/90

12/19/90

113,617

100

4.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

175,000

Locations

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

13.0

04/04/05

11/18/05

300 07 0030 / 5453

ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE

1.50

04/18/06

11/18/06

300 05 0031 / 5146

ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE

20.50

04/04/05

11/18/05

Totals per Traffic Equipment Painting

374,301

35.0

4,850 06/27/05

07/15/05

300 7,550 06/27/05 12,700

07/15/05

2,652

100

0

0

7,892

100

10,544

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 330

1/1/2008 AND 12/31/2008

Ward 31 Ray Suarez CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Traffic Totals per Traffic

623,516

815,396

Totals per Construction Phase

2,779,871

2,494,788

Totals for Ward 31

3,043,621

2,498,872

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 331

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE

.0

04/01/08

08/30/08

0

0

0

300 06 0308 / 5414

ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,171

100

300 05 0047 / 5162

ON W CORNELIA AVE FROM N RAVENSWOOD AVE TO N WOLCOTT AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 / 32277

ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE

.0

04/01/08

08/30/08

0

300 06 / 32275

ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE

.0

03/01/07

10/31/07

3,900 02/14/07

300 06 / 32275

ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST

.0

03/01/07

10/31/07

300 06 0308 / 5414

ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE

.0

02/01/06

07/31/06

300 05 0047 / 5162

ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE

.0

07/17/06

300 06 0292 / 5399

W FULLERTON AVE AND N LAKEWOOD AVE

1.0

300 06 0292 / 5399

2800 N ASHLAND AVE

281 00 / 33670

2401-2409 N CLYBOURN AVE

300 06 0292 / 5399

2942 N LINCOLN AVE

1.0

300 06 0292 / 5399

1100 N NORTH BRANCH ST

1.0

Totals per Design/Engineering

Work Type: Feasibility Study 302 00 0079 / 5767

ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE

Totals per Lighting/Electrical

0

0

03/14/07

3,194

100

3,900 02/14/07

03/14/07

3,194

100

0 02/01/06

07/31/06

1,086

100

07/30/06

0 07/17/06

07/30/06

0

0

02/01/05

03/01/05

5,000 03/01/05

04/01/05

2,745

100

1.0

03/31/05

04/20/05

2,000 03/30/05

04/27/05

2,000

100

.0

01/01/08

12/31/08

01/06/05

03/11/05

4.0

0

0

0

1,000 07/12/05

07/20/05

0

100

10,000 12/10/04

04/14/05

4,397

100

25,800

18,787

Projects .0

10/25/01

10/25/01

0 10/25/01 25,800

10/25/01

0 18,787

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 332

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0032 / 5455

ON N AVONDALE AVE FROM N SEELEY AVE TO N WINCHESTER AVE

3.0

04/18/06

11/18/06

1,200 09/22/06

10/10/06

606

100

300 07 0032 / 5455

ON N CLIFTON AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE

1.0

04/18/06

11/18/06

400 09/22/06

10/10/06

202

100

300 06 0122 / 5275

ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST

6.0

11/01/03

11/07/03

2,250 10/30/03

10/30/03

1,461

100

300 07 0032 / 5455

ON N HAMILTON AVE FROM W WEBSTER AVE TO N AVONDALE AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON N HOYNE AVE FROM W CHICAGO AVE TO W HADDON AVE

10.0

04/18/06

11/18/06

4,000 09/22/06

10/10/06

2,020

100

300 07 0032 / 5455

ON N HOYNE AVE FROM W WEBSTER AVE TO N AVONDALE AVE

10.0

04/18/06

11/18/06

4,000 09/22/06

10/10/06

2,020

100

300 07 0032 / 5455

ON N KENMORE AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON N LAKEWOOD AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 09 / 33098

ON N LEAVITT ST FROM W HOMER ST TO W CORTLAND ST

4.0

08/26/08

08/27/08

1,600 08/26/08

08/27/08

0

100

300 07 0032 / 5455

ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST

8.0

04/18/06

11/18/06

3,200 09/22/06

10/10/06

1,616

100

300 07 0032 / 5455

ON N MAGNOLIA AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

1,600 09/22/06

10/10/06

808

100

300 07 0032 / 5455

ON N SEELEY AVE FROM W WEBSTER AVE TO N AVONDALE AVE

2.0

04/18/06

11/18/06

800 09/22/06

10/10/06

404

100

300 07 0032 / 5455

ON N SEMINARY AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

2.50

04/18/06

11/18/06

1,000 09/22/06

10/10/06

505

100

300 07 0032 / 5455

ON N WAYNE AVE FROM N CLYBOURN AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

1,600 09/22/06

10/10/06

404

100

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

.0

03/01/06

12/31/06

300 07 0032 / 5455

ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

1,600 09/22/06

300 07 0032 / 5455

ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

300 07 0032 / 5455

ON W BARRY AVE FROM N LINCOLN AVE TO N ASHLAND AVE

2.0

04/18/06

11/18/06

300 07 0032 / 5455

ON W BARRY AVE FROM N RACINE AVE TO N LINCOLN AVE

13.0

04/18/06

300 07 0032 / 5455

ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST

5.0

300 11 / 32221

ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST

300 06 0122 / 5275

ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE

300 11 / 32221

0

0

0

10/10/06

808

100

1,600 09/22/06

10/10/06

808

100

800 09/22/06

10/10/06

404

100

11/18/06

5,200 09/22/06

10/10/06

2,626

100

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

5.0

08/10/07

09/10/07

2,200 09/10/07

03/07/08

2,200

100

13.44

12/01/03

12/01/03

5,376 11/15/03

11/20/03

5,460

100

ON W CONCORD PL FROM N HOYNE AVE TO N LEAVITT ST

4.0

10/10/07

10/10/07

1,600 10/10/07

10/10/07

1,600

100

300 07 0032 / 5455

ON W CONCORD PL FROM N MILWAUKEE AVE TO N LEAVITT ST

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 11 / 32221

ON W CONCORD PL FROM N THROOP ST TO N ADA ST

4.0

08/10/07

09/10/07

1,600 09/10/07

09/07/08

1,600

100

300 07 0032 / 5455

ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE

7.50

04/18/06

11/18/06

3,000 09/22/06

10/10/06

1,515

100

300 07 0032 / 5455

ON W CORTLAND ST FROM N DAMEN AVE TO N HERMITAGE AVE

15.0

04/18/06

11/18/06

6,000 09/22/06

10/10/06

3,030

100

300 07 0032 / 5455

ON W FLETCHER ST FROM N RACINE AVE TO N GREENVIEW AVE

12.0

04/18/06

11/18/06

4,800 09/22/06

10/10/06

2,424

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 333

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0032 / 5455

ON W GEORGE ST FROM N LINCOLN AVE TO N ASHLAND AVE

12.0

04/18/06

11/18/06

4,800 09/22/06

10/10/06

2,424

100

300 07 0032 / 5455

ON W GEORGE ST FROM N RACINE AVE TO N LINCOLN AVE

7.0

04/18/06

11/18/06

2,800 09/22/06

10/10/06

1,414

100

300 07 0032 / 5455

ON W HADDON AVE FROM N DAMEN AVE TO N LEAVITT ST

8.0

04/18/06

11/18/06

3,200 09/22/06

10/10/06

1,616

100

300 07 0032 / 5455

ON W HADDON AVE FROM N OAKLEY BLVD TO N LEAVITT ST

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST

3.50

04/18/06

11/18/06

1,400 09/22/06

10/10/06

707

100

300 07 0032 / 5455

ON W IOWA ST FROM N DAMEN AVE TO N WESTERN AVE

20.0

04/18/06

11/18/06

8,000 09/22/06

10/10/06

4,040

100

300 07 0032 / 5455

ON W LE MOYNE ST FROM N HOYNE AVE TO N LEAVITT ST

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

2.50

04/18/06

11/18/06

1,000 09/22/06

10/10/06

0

100

300 07 0032 / 5455

ON W LYNDALE ST FROM N AVONDALE AVE TO N LEAVITT ST

2.0

04/18/06

11/18/06

800 09/22/06

10/10/06

404

100

300 09 / 33098

ON W MOFFAT ST FROM N HOYNE AVE TO N LEAVITT ST

5.0

08/26/08

08/27/08

2,000 08/26/08

08/27/08

0

100

300 07 0032 / 5455

ON W NELSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON W NELSON ST FROM N RACINE AVE TO N SOUTHPORT AVE

8.0

04/18/06

11/18/06

3,200 09/22/06

10/10/06

1,616

100

300 07 0032 / 5455

ON W OAKDALE AVE FROM N RACINE AVE TO N LAKEWOOD AVE

4.0

04/18/06

11/18/06

1,600 09/22/06

10/10/06

808

100

300 07 0032 / 5455

ON W OAKDALE AVE FROM N SOUTHPORT AVE TO N ASHLAND AVE

4.0

04/18/06

11/18/06

1,600 09/22/06

10/10/06

808

100

300 07 0032 / 5455

ON W POTOMAC AVE FROM N HOYNE AVE TO N LEAVITT ST

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON W RICE ST FROM N DAMEN AVE TO N WESTERN AVE

15.0

04/18/06

11/18/06

6,000 09/22/06

10/10/06

3,030

100

300 11 / 32221

ON W SCHOOL ST FROM N PAULINA ST TO N RAVENSWOOD AVE

5.0

08/10/07

09/10/07

2,200 09/10/07

03/07/08

2,200

100

300 07 0032 / 5455

ON W THOMAS ST FROM N DAMEN AVE TO N OAKLEY BLVD

12.0

04/18/06

11/18/06

4,800 09/22/06

10/10/06

2,424

100

300 07 0032 / 5455

ON W WALTON ST FROM N DAMEN AVE TO N WESTERN AVE

16.0

04/18/06

11/18/06

6,400 09/22/06

10/10/06

3,232

100

300 07 0032 / 5455

ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

300 07 0032 / 5455

ON W WELLINGTON AVE FROM N RACINE AVE TO N ASHLAND AVE

16.0

04/18/06

11/18/06

6,400 09/22/06

10/10/06

3,232

100

300 07 0032 / 5455

ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

5.0

04/18/06

11/18/06

2,000

302 00 0092 / 5774

3212 N PAULINA ST

1.0

0 09/21/01

302 00 0092 / 5774

3224 N PAULINA ST

1.0

302 00 0092 / 5774

3240 N PAULINA ST

1.0

300 06 0069 / 5233

1900 N WILMOT AVE

302 00 0092 / 5774 300 06 0069 / 5233

0

0

09/21/01

206

100

0 09/21/01

09/21/01

206

100

0 09/21/01

09/21/01

206

100

4.0

1,500 01/10/03

01/10/03

1,500

100

2109 W DICKENS AVE

1.0

0 01/16/02

01/16/02

203

100

1756 W NEWPORT AVE

1.0

210 01/10/03

01/10/03

203

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

357.44

01/13/03

01/13/03

141,336

76,130

1,764,767

1,912,147

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 334

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 07 0032 / 5455

ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST

9.0

04/18/06

11/18/06

3,600 09/07/06

10/10/06

1,818

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD

9.0

04/18/06

11/18/06

3,600 09/07/06

10/10/06

1,818

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE

9.0

04/18/06

11/18/06

3,600 09/07/06

10/10/06

1,818

100

300 09 / 33109

ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

1.0

02/01/08

12/31/08

400 08/07/08

08/11/08

339

100

300 09 / 33109

ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE

1.0

06/23/08

06/27/08

400 04/01/08

12/01/08

0

0

300 07 0032 / 5455

ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

2,000 09/07/06

10/10/06

2,020

100

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

1,600 09/07/06

10/10/06

808

100

300 06 0122 / 5275

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

27.50

11/01/03

11/21/03

11,200 10/05/03

10/06/03

7,718

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST

8.0

04/18/06

11/18/06

3,200 09/07/06

10/10/06

1,616

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

1,600 09/07/06

10/10/06

808

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST

4.50

04/18/06

11/18/06

1,800 09/07/06

10/10/06

909

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE

24.0

04/18/06

11/18/06

9,600 09/07/06

10/10/06

4,848

100

300 07 0032 / 5455

ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE

9.0

04/18/06

11/18/06

3,600 09/07/06

10/10/06

1,818

100

300 03 0043 / 4914

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

9.50

07/10/04

07/13/04

3,800 07/05/04

07/12/04

2,430

100

300 03 0044 / 4915

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

41.0

07/10/04

07/13/04

16,400 07/12/04

08/10/04

10,486

100

300 06 0069 / 5233

ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE

32.0

10/04/02

10/04/02

16,800 10/01/02

10/01/02

12,000

100

300 03 0032 / 4903

ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE

20.0

08/16/04

08/19/04

8,000 07/01/04

07/14/04

9,661

100

300 07 0032 / 5455

ON W WEBSTER AVE FROM N SOUTHPORT AVE TO N CLYBOURN AVE

5.0

04/18/06

11/18/06

2,000 09/22/06

10/10/06

1,010

100

Totals per 400 Watt Changeout

231.50

96,800

63,742

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 335

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1583 / 7769

2126 N CLIFTON AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

300 06 0139 / 5289

2148 N DAMEN AVE

1,483.0

03/01/04

12/01/04

0 06/01/06

06/10/06

44,807

100

302 00 0092 / 5774

2150 N DAMEN AVE

15.0

0 03/07/01

01/17/02

3,535

100

805 06 1537 / 7723

1921 N ELSTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1438 / 7624

1939 N ELSTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1207 / 7393

1728 N HONORE ST

1.0

08/09/95

08/09/95

0 08/09/95

08/09/95

300

100

805 06 1208 / 7394

2036 N HONORE ST

1.0

04/17/95

04/17/95

0 04/17/95

04/17/95

300

100

805 06 1147 / 7333

2715 N KENMORE AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 1828 / 8014

1860 N MAUD AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

805 06 1829 / 8015

1921 N MAUD AVE

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1830 / 8016

1924 N MAUD AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

805 06 1790 / 7976

1944 N MAUD AVE

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1793 / 7979

1944 N MAUD AVE

1.0

01/31/97

01/31/97

0 01/31/97

01/31/97

300

100

805 06 1802 / 7988

1944 N MAUD AVE

1.0

01/13/97

01/13/97

0 01/13/97

01/13/97

300

100

805 06 1482 / 7668

1618 N PAULINA ST

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 1490 / 7676

1874 N SHEFFIELD AVE

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

805 06 0653 / 6839

2218 N SOUTHPORT AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0654 / 6840

2258 N SOUTHPORT AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0481 / 6667

2218 N WAYNE AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 0510 / 6696

2218 N WAYNE AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 0482 / 6668

2237 N WAYNE AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 0483 / 6669

2252 N WAYNE AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0484 / 6670

2257 N WAYNE AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 0534 / 6720

959 N WESTERN AVE

1.0

10/26/95

10/26/95

0 10/26/95

10/26/95

300

100

805 06 0516 / 6702

1001 N WESTERN AVE

1.0

04/15/96

04/15/96

0 04/15/96

04/15/96

300

100

805 06 0440 / 6626

1920 N WINCHESTER AVE

1.0

05/18/95

05/18/95

0 05/18/95

05/18/95

300

100

805 06 0722 / 6908

2316 W AUGUSTA BLVD

1.0

04/10/96

04/10/96

0 04/10/96

04/10/96

300

100

805 06 0723 / 6909

2334 W AUGUSTA BLVD

1.0

09/18/95

09/18/95

0 09/18/95

09/18/95

300

100

805 06 0454 / 6640

1804 W BLOOMINGDALE AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0455 / 6641

1812 W BLOOMINGDALE AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0838 / 7024

2110 W CATON ST

1.0

03/08/96

03/08/96

0 03/08/96

03/08/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 336

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0839 / 7025

2120 W CATON ST

1.0

03/08/96

03/08/96

0 03/08/96

03/08/96

300

100

805 06 0799 / 6985

2138 W CATON ST

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 1976 / 8162

2221 W CHARLESTON ST

1.0

12/12/96

12/12/96

0 12/12/96

12/12/96

300

100

805 06 1602 / 7788

2213 W CORTLAND ST

1.0

01/11/96

01/11/96

0 01/11/96

01/11/96

300

100

805 06 1884 / 8070

2213 W CORTLAND ST

1.0

11/01/95

11/01/95

0 11/01/95

11/01/95

300

100

805 06 0815 / 7001

1155 W FULLERTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0796 / 6982

1357 W FULLERTON AVE

1.0

11/15/96

11/15/96

0 11/15/96

11/15/96

300

100

805 06 1535 / 7721

2338 W MC LEAN AVE

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 1818 / 8004

2023 W MELROSE ST

1.0

10/26/95

10/26/95

0 10/26/95

10/26/95

300

100

805 06 0684 / 6870

2316 W RICE ST

1.0

11/17/95

11/17/95

0 11/17/95

11/17/95

300

100

805 06 0495 / 6681

2350 W WALTON ST

1.0

02/15/96

02/15/96

0 02/15/96

02/15/96

300

100

805 06 0485 / 6671

1332 W WEBSTER AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 1489 / 7675

1478 W WEBSTER AVE

1.0

11/13/97

11/13/97

0 11/13/97

11/13/97

300

100

805 06 0536 / 6722

1856 W WELLINGTON AVE

1.0

07/19/96

07/19/96

0 07/19/96

07/19/96

300

100

805 06 0489 / 6675

1150 W WRIGHTWOOD AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

1824 W WEBSTER AVE

Work Type: Arterial Strt Lighting/Lamps 300 07 0001 / 5424

ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

300 07 0032 / 5455

1234 W GEORGE ST

Totals per Arterial Strt Lighting/Lamps

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2150 N DAMEN AVE

1,542.0

0

61,542

Lamps 2,361.0

06/01/07

12/31/07

69,507 07/21/07

08/18/07

69,507

100

.50

04/18/06

11/18/06

3,500 11/21/06

11/21/06

0

100

.0

03/01/06

12/31/06

0

0

0

1.0

04/18/06

11/18/06

3,000

0

0

6,500

0

Blocks

1.50

Installations 2,166.0

0 04/24/02

04/27/02

39,439

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 337

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

302 00 0092 / 5774

2944 N SOUTHPORT AVE

1.0

0 08/30/01

08/30/01

404

100

302 00 0092 / 5774

2954 N SOUTHPORT AVE

1.0

0 08/30/01

08/30/01

404

100

302 00 0092 / 5774

2315 W AUGUSTA BLVD

1.0

0 08/22/01

08/22/01

404

100

302 00 0092 / 5774

2323 W AUGUSTA BLVD

1.0

0 08/22/01

08/22/01

404

100

4.0

0

1,616

0

0

0

22,567

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

2401-2409 N CLYBOURN AVE

Work Type: Lighting Imprvmnts

Blocks .0

01/01/08

12/31/08

Installations

300 06 0292 / 5399

2800 N ASHLAND AVE

.0

06/29/05

12/31/05

281 00 / 33670

2401-2409 N CLYBOURN AVE

.0

01/01/08

12/31/08

300 06 0292 / 5399

1100 N NORTH BRANCH ST

1.0

10/19/06

Totals per Lighting Imprvmnts

Work Type: Loop Lighting 281 00 / 33670

2401-2409 N CLYBOURN AVE

29,778 08/15/05 0 64,000 10/19/06

1.0

12/31/05

0

0

86

70

93,778

22,653

0

0

Blocks .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 338

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 07 0032 / 5455

ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST

9.0

04/18/06

11/18/06

12,150 09/22/06

10/10/06

7,706

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD

9.0

04/18/06

11/18/06

12,150 09/22/06

10/10/06

7,706

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 07 0032 / 5455

ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE

9.0

04/18/06

11/18/06

12,150 09/22/06

10/10/06

7,706

100

300 09 / 33109

ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

1.0

08/25/08

09/12/08

1,350 08/25/08

09/12/08

1,147

100

300 07 0032 / 5455

ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE

8.0

04/18/06

11/18/06

10,800 09/22/06

10/10/06

6,850

100

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

5,400 09/22/06

10/10/06

3,425

100

300 06 0122 / 5275

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

21.50

11/01/03

11/21/03

25,800 10/14/03

10/20/03

37,364

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST

8.0

04/18/06

11/18/06

10,800 09/22/06

10/10/06

6,850

100

300 07 0032 / 5455

ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

4.0

04/18/06

11/18/06

5,400 09/22/06

10/10/06

3,425

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST

4.50

04/18/06

11/18/06

6,075 09/22/06

10/10/06

3,853

100

300 07 0032 / 5455

ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE

24.0

04/18/06

11/18/06

32,400 09/22/06

10/10/06

20,550

100

300 06 0122 / 5275

ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE

13.44

12/01/03

12/06/03

18,144 11/28/03

12/04/03

18,721

100

300 07 0032 / 5455

ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE

9.0

04/18/06

11/18/06

12,150 09/22/06

10/10/06

7,706

100

300 06 0069 / 5233

ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE

32.0

10/01/02

10/31/02

38,400 10/01/02

10/21/02

46,764

100

300 07 0032 / 5455

ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE

4.0

04/18/06

11/18/06

5,400 09/22/06

10/10/06

3,425

100

300 03 0032 / 4903

ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE

20.0

08/16/04

08/19/04

27,000 09/01/04

10/01/04

0

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 281 00 / 33670

2401-2409 N CLYBOURN AVE

Work Type: POD Camera Pole 281 00 / 33670

2401-2409 N CLYBOURN AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

2657 N CLYBOURN AVE

189.44

247,719

190,903

Blocks .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Poles .0

Lamps .0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 339

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting 300 06 / 32277

ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE

300 06 0308 / 5414

ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE

300 06 / 32277

ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE

300 06 / 32275

ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE

300 06 / 32275

ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST

300 06 0308 / 5414

ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

Blocks .0

05/04/08

12/31/08

1.0

03/01/06

05/01/06

.0

05/04/08

12/31/08

1.0

04/01/07

12/31/07

1.0

04/01/07

.50

03/09/06

0

0

0

04/28/06

63,684

100

0

0

108,392 03/27/07

06/29/07

69,752

100

12/31/07

108,392 03/27/07

06/29/07

69,752

100

05/09/06

49,164 03/09/06

04/28/06

31,842

100

3.50

98,328 03/09/06 0

364,276

235,030

Blocks

300 03 0032 / 4903

ON N HOYNE AVE FROM W WABANSIA AVE TO W CHURCHILL ST

2.0

09/15/04

11/30/04

60,000 09/20/04

01/21/05

0

100

300 06 0235 / 5349

ON W LYNDALE ST FROM N LEAVITT ST TO N WESTERN AVE

2.0

06/01/03

08/01/03

145,471 05/28/03

07/30/03

133,463

100

300 03 0032 / 4903

ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST

1.50

10/01/04

12/15/04

92,500 10/08/04

01/21/05

42,715

100

300 06 0267 / 5375

ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE

2.0

08/15/04

10/15/04

150,000 09/20/04

01/21/05

162,403

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 03 0032 / 4903

ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE

Work Type: Short Arm Installs - Arterial 281 00 / 33670

2401-2409 N CLYBOURN AVE

7.50

447,971

338,581

Locations 1.0

09/15/04

11/30/04

01/01/08

12/31/08

50,944 09/20/04

01/21/05

50,000

100

0

0

Locations .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 340

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

281 00 / 33670

2401-2409 N CLYBOURN AVE

0

0

302 00 0092 / 5774

3204 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3230 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3252 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3310 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3336 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3350 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3410 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3430 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3448 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

3456 N RAVENSWOOD AVE

1.0

0 05/18/01

05/18/01

378

100

302 00 0092 / 5774

2942 N SOUTHPORT AVE

1.0

0 08/30/01

08/30/01

335

100

302 00 0092 / 5774

2952 N SOUTHPORT AVE

1.0

0 08/30/01

08/30/01

335

100

.0

300 09 / 33109

ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

300 09 / 33109

ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE

300 06 0108 / 5263

12/31/08

12.0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

01/01/08

0

0

4,450

Locations 1.0

06/16/08

06/20/08

300 06/16/08

06/20/08

200

100

2.25

05/19/08

06/20/08

450 04/01/08

12/01/08

450

100

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

21.50

10/01/03

10/22/03

9,520 09/20/03

09/26/03

9,520

100

300 07 0001 / 5424

ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE

.0

03/01/06

12/31/06

300 03 0043 / 4914

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

14.50

07/26/04

08/09/04

4,725 07/01/04

300 03 0044 / 4915

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

72.0

07/26/04

08/09/04

302 00 0079 / 5767

ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE

25.40

12/01/01

12/22/01

300 07 0032 / 5455

ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

2.50

04/18/06

11/18/06

300 06 0058 / 5229

ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE

36.0

300 03 0032 / 4903

ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE

52.0

08/11/04

300 05 0043 / 5158

ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE

2.50

300 07 0032 / 5455

ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

300 06 0108 / 5263

1234 N HALSTED ST

300 07 0032 / 5455

1824 W WEBSTER AVE

Totals per Strt Light Pole Painting

0

0

0

08/10/04

2,961

100

15,950 08/01/04

08/10/04

14,703

100

3,200 04/20/01

05/03/01

3,175

100

500 01/05/07

01/05/07

0

100

9,940 09/09/02

09/27/02

9,940

100

08/19/04

14,150 08/16/04

08/27/04

9,661

100

04/04/05

11/18/05

500 06/27/05

07/23/05

401

100

5.0

04/18/06

11/18/06

1,000 01/05/07

01/05/07

0

100

5.0

10/01/03

10/01/03

1,250 10/05/03

10/06/03

1,050

100

502.0

04/18/06

11/18/06

107,050 03/01/06

12/31/06

75,250

100

741.65

168,535

127,311

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 341

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

Blocks

2401-2409 N CLYBOURN AVE

.0

Work Type: Traffic Signal Regrouping

Lamps

300 06 0139 / 5289

2148 N DAMEN AVE

3,989.0

01/01/08

12/31/08

03/01/04

12/01/04

0

20,743 10/25/06

10/31/06

0

0

43,440

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 342

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2285 / 8471

1830 N ASHLAND AVE

2.0

06/04/96

06/04/96

0 06/04/96

06/04/96

1,500

100

805 06 2311 / 8497

1895 N ASHLAND AVE

7.0

07/01/96

07/01/96

0 07/01/96

07/01/96

5,250

100

805 06 2309 / 8495

1900 N ASHLAND AVE

27.0

07/10/96

07/10/96

0 07/10/96

07/10/96

20,250

100

805 06 2310 / 8496

1900 N ASHLAND AVE

43.0

07/10/96

07/10/96

0 07/10/96

07/10/96

32,250

100

302 00 0070 / 5758

2520 N CLYBOURN AVE

0 04/02/97

04/09/97

15,267

100

805 06 2192 / 8378

2538 N CLYBOURN AVE

12.0

12/31/95

12/31/95

0 12/31/95

12/31/95

9,000

100

805 06 2193 / 8379

2538 N CLYBOURN AVE

18.0

04/09/97

04/09/97

0 04/09/97

04/09/97

13,500

100

805 06 2443 / 8629

1794 N DAMEN AVE

13.0

06/16/93

06/16/93

0 06/16/93

06/16/93

9,750

100

300 06 0217 / 5337

2148 N DAMEN AVE

1,008.0

04/12/04

04/26/04

56,658 04/19/04

05/10/04

76,818

100

805 06 2282 / 8468

2230 N DAMEN AVE

44.0

07/30/96

07/30/96

0 07/30/96

07/30/96

33,000

100

805 06 2440 / 8626

2270 N DAMEN AVE

8.0

09/26/95

09/26/95

0 09/26/95

09/26/95

6,000

100

805 06 2169 / 8355

2000 N ELSTON AVE

7.0

12/31/95

12/31/95

0 12/31/95

12/31/95

5,250

100

302 00 0070 / 5758

2050 N ELSTON AVE

0 12/20/97

12/31/97

18,723

100

805 06 2141 / 8327

2050 N ELSTON AVE

805 06 2543 / 8729

18.0

12/31/97

12/31/97

0 12/31/97

12/31/97

13,500

100

1701 N HERMITAGE AVE

7.0

08/31/92

08/31/92

0 08/31/92

08/31/92

5,250

100

805 06 2732 / 8918

1805 N HONORE ST

6.0

05/27/94

05/27/94

0 05/27/94

05/27/94

4,500

100

805 06 2884 / 9070

1060 N HOOKER ST

6.0

12/03/93

12/03/93

0 12/03/93

12/03/93

4,500

100

805 06 2712 / 8898

1701 N LEAVITT ST

6.0

01/01/95

01/01/95

0 01/01/95

01/01/95

4,500

100

805 06 2668 / 8854

1805 N MARSHFIELD AVE

6.0

11/25/94

11/25/94

0 11/25/94

11/25/94

4,500

100

805 06 2545 / 8731

1798 N PAULINA ST

6.0

09/01/92

09/01/92

0 09/01/92

09/01/92

4,500

100

805 06 2669 / 8855

1805 N WINCHESTER AVE

6.0

12/14/94

12/14/94

0 12/14/94

12/14/94

4,500

100

805 06 2670 / 8856

1805 N WOLCOTT AVE

10.0

10/17/94

10/17/94

0 10/17/94

10/17/94

7,500

100

805 06 2521 / 8707

1805 N WOOD ST

10.0

01/27/95

01/27/95

0 01/27/95

01/27/95

7,500

100

805 06 2291 / 8477

2925 S ASHLAND AVE

14.0

01/01/91

01/01/91

0 01/01/91

01/01/91

10,500

100

805 06 2474 / 8660

1605 W ARMITAGE AVE

12.0

12/14/95

12/14/95

0 12/14/95

12/14/95

9,000

100

805 06 2420 / 8606

1670 W ARMITAGE AVE

8.0

12/11/95

12/11/95

0 12/11/95

12/11/95

6,000

100

805 06 2755 / 8941

1805 W BARRY AVE

4.0

06/21/94

06/21/94

0 06/21/94

06/21/94

3,000

100

805 06 2219 / 8405

1800 W BELMONT AVE

6.0

05/04/94

05/04/94

0 05/04/94

05/04/94

4,500

100

805 06 2879 / 9065

1779 W CORNELIA AVE

6.0

12/21/93

12/21/93

0 12/21/93

12/21/93

4,500

100

805 06 2201 / 8387

1599 W CORTLAND ST

4.0

07/10/96

07/10/96

0 07/10/96

07/10/96

3,000

100

805 06 2227 / 8413

1599 W CORTLAND ST

4.0

07/10/96

07/10/96

0 07/10/96

07/10/96

3,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 343

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2642 / 8828

1800 W DIVERSEY PKWY

805 06 2666 / 8852

1326 W DIVISION ST

805 06 2647 / 8833

Fixtures 6.0

05/05/94

05/05/94

0 05/05/94

05/05/94

4,500

100

24.0

06/22/93

06/22/93

0 06/22/93

06/22/93

18,000

100

1635 W FULLERTON AVE

8.0

06/02/93

06/02/93

0 06/02/93

06/02/93

6,000

100

805 06 2195 / 8381

2036 W FULLERTON AVE

12.0

06/19/97

06/19/97

0 06/19/97

06/19/97

9,000

100

805 06 2196 / 8382

2036 W FULLERTON AVE

8.0

06/04/93

06/04/93

0 06/04/93

06/04/93

6,000

100

805 06 2144 / 8330

2295 W FULLERTON AVE

32.0

12/31/95

12/31/95

0 12/31/95

12/31/95

24,000

100

805 06 2923 / 9109

1799 W MELROSE ST

6.0

10/13/93

10/13/93

0 10/13/93

10/13/93

4,500

100

302 00 0072 / 5760

1430 W NORTH AVE

1.0

0 10/12/99

10/22/99

19,862

100

302 00 0072 / 5760

1450 W NORTH AVE

1.0

0 10/05/99

10/08/99

12,433

100

805 06 2925 / 9111

1763 W ROSCOE ST

6.0

12/01/93

12/01/93

0 12/01/93

12/01/93

4,500

100

805 06 2924 / 9110

1779 W SCHOOL ST

6.0

10/15/93

10/15/93

0 10/15/93

10/15/93

4,500

100

805 06 2650 / 8836

1601 W WEBSTER AVE

14.0

05/20/92

05/20/92

0 05/20/92

05/20/92

10,500

100

302 00 0070 / 5758

1650 W WEBSTER AVE

0 12/15/97

12/26/97

9,809

100

805 06 2127 / 8313

1650 W WEBSTER AVE

0 12/26/97

12/26/97

12,750

100

302 00 0070 / 5758

1900 W WEBSTER AVE

0 12/10/97

12/20/97

9,488

100

805 06 2100 / 8286

1900 W WEBSTER AVE

9.0

0 12/20/97

12/20/97

6,750

100

302 00 0072 / 5760

1930 W WEBSTER AVE

1.0

0 10/20/99

11/10/99

30,903

100

805 06 2439 / 8625

1999 W WEBSTER AVE

8.0

05/01/92

05/01/92

0 05/01/92

05/01/92

6,000

100

805 06 2619 / 8805

1999 W WEBSTER AVE

40.0

01/23/95

01/23/95

0 01/23/95

01/23/95

30,000

100

805 06 2641 / 8827

1805 W WELLINGTON AVE

6.0

12/14/94

12/14/94

0 12/14/94

12/14/94

4,500

100

805 06 2645 / 8831

1898 W WRIGHTWOOD AVE

4.0

12/14/94

12/14/94

0 12/14/94

12/14/94

3,000

100

Totals per Underpass Lighting

17.0

1,537.0

12/26/97

12/20/97

12/26/97

12/20/97

56,658

587,803

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 344

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N ELSTON AVE AND N LEAVITT ST

.50

0 10/24/02

10/24/02

5,037

100

210 06 0130 / 4389

N ELSTON AVE AND W NORTH AVE

1.0

0 10/16/02

10/16/02

1,850

100

210 06 0130 / 4389

N SHEFFIELD AVE AND W NORTH AVE

1.0

0 10/16/02

10/16/02

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W ARMITAGE AVE

.50

04/01/05

04/02/05

5,282 04/07/05

04/07/05

4,523

100

210 06 0219 / 4459

N WESTERN AVE AND W CHICAGO AVE

.50

04/15/05

04/15/05

5,282 04/10/05

04/10/05

4,004

100

210 06 0219 / 4459

N WESTERN AVE AND W FULLERTON AVE

.50

04/04/05

04/05/05

5,282 03/25/05

03/25/05

4,523

100

300 06 0225 / 5340

1800-1775 N LEAVITT ST

4.0

09/02/02

10/31/02

9,850 07/25/02

08/09/02

7,739

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0231 / 4470

W DIVISION ST AND N HALSTED ST

300 06 0078 / 5241

2400 N ASHLAND AVE

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0171 / 4420

N LINCOLN AVE AND W SCHOOL ST

Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276

W ADDISON ST AND N PAULINA ST

210 06 / 32276

W DIVERSEY PKWY AND N SHEFFIELD AVE

Totals per Pedestrian Countdown Signal Installation

Work Type: Removal Temp Wiring - Signals

8.0

25,695

29,526

Locations .0

03/01/08

12/01/08

1.0

04/01/98

12/01/98

1.0

0 5,615 03/20/98

04/20/00

5,615

0

0

4,794

100

4,794

Locations 08/02/07

09/20/07

57,120 04/19/07

4.0

11/21/07

11/26/07

5,760 12/10/07

.0

04/01/07

02/28/08

5,760 11,520

3,425

.50

91,967

85

3,425

100

0

0

Installations

4.0

12/14/07

Crossings

300 06 0197 / 5322

N OAKLEY AVE AND W AUGUSTA BLVD

1.0

4,000 07/17/01

07/18/01

6,359

100

300 06 0197 / 5322

N OAKLEY AVE AND W DIVISION ST

.50

2,000 07/11/01

07/12/01

131

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

2148 N DAMEN AVE

1.50

6,000

6,490

Intersections 71.0

11/19/03

11/23/03

0 12/08/06 541,505

12/15/06

11,227 2,224,762

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 345

1/1/2008 AND 12/31/2008

Ward 32 Scott Waguespack CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0022 / 4297

W GEORGE ST AND N LINCOLN AVE

1.0

12/03/01

03/31/02

216,500 11/19/01

03/01/02

160,969

100

814 06 0288 / 16500

2000 N ASHLAND AVE

1.0

01/03/92

01/03/92

0 01/03/92

01/03/92

126,620

100

814 06 0289 / 16501

2037 N ASHLAND AVE

1.0

01/03/92

01/03/92

0 01/03/92

01/03/92

126,620

100

814 06 0244 / 16456

2340 N CLYBOURN AVE

1.0

01/01/95

01/01/95

0 01/01/95

01/01/95

125,000

100

210 06 0027 / 4301

2700 N CLYBOURN AVE

06/01/02

01/15/03

192,605 04/24/02

12/13/02

190,881

100

814 06 0106 / 16321

2269 N DAMEN AVE

1.0

09/24/94

09/24/94

0 09/24/94

09/24/94

33,115

100

814 06 0291 / 16503

2000 N ELSTON AVE

1.0

01/02/92

01/02/92

0 01/02/92

01/02/92

126,620

100

814 06 0290 / 16502

2200 N ELSTON AVE

1.0

11/14/91

11/14/91

0 11/14/91

11/14/91

126,620

100

814 06 0067 / 16283

1200 N NORTH BRANCH ST

1.0

03/22/94

03/22/94

0 03/22/94

03/22/94

132,866

100

814 06 0162 / 16374

1952 N SOUTHPORT AVE

1.0

07/07/97

07/07/97

0 07/07/97

07/18/97

200,000

100

814 06 0265 / 16477

2132 N SOUTHPORT AVE

1.0

03/09/92

03/09/92

0 03/09/92

03/09/92

108,062

100

814 06 0377 / 16567

1599 N THROOP ST

1.0

04/30/96

04/30/96

0 04/30/96

04/30/96

142,921

100

814 06 0275 / 16487

2399 N WOOD ST

1.0

01/26/89

01/26/89

0 01/26/89

01/26/89

123,765

100

814 06 0105 / 16320

1670 W ARMITAGE AVE

1.0

10/20/94

10/20/94

0 10/20/94

10/20/94

59,079

100

814 06 0118 / 16333

1732 W ARMITAGE AVE

1.0

09/28/93

09/28/93

0 09/28/93

09/28/93

110,321

100

210 06 0018 / 4293

1835 W FULLERTON AVE

1.0

02/01/98

04/01/98

20,000 01/21/98

06/18/98

27,729

100

814 06 0298 / 16510

2130 W FULLERTON AVE

1.0

01/01/97

01/01/97

0 01/01/97

92,412

100

814 06 0107 / 16322

1438 W NORTH AVE

1.0

10/27/94

10/27/94

0 10/27/94

57,284

100

17.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 07 0032 / 5455

1824 W WEBSTER AVE

10/27/94

429,105

2,070,884

Locations 24.0

04/18/06

11/18/06

6,450 03/01/06

12/31/06

6,450

Totals per Construction Phase

2,306,272

4,136,909

Totals for Ward 32

2,332,072

4,155,695

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 346

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32146

ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE

1.0

05/01/07

10/31/07

3,900 05/29/07

06/28/07

2,344

100

300 06 / 32146

ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE

1.0

05/01/07

10/31/07

3,900 05/29/07

06/28/07

2,349

100

300 06 / 32146

ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE

.0

05/01/07

10/31/07

3,900 05/29/07

06/27/07

2,349

100

300 06 0308 / 5414

ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,215

100

300 06 0308 / 5414

ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,215

100

300 06 / 32146

ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE

.0

05/01/07

10/31/07

0

0

100

300 06 / 32277

ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE

.0

04/01/08

08/30/08

0

0

0

210 06 / 32040

N CALIFORNIA AVE AND W IRVING PARK RD

.0

11/01/06

12/31/07

5,000

0

0

210 06 0158 / 5058

W LAWRENCE AVE AND N KIMBALL AVE

.0

08/15/05

12/31/05

235

100

Totals per Design/Engineering

2.0

0 08/15/05 16,700

12/31/05

9,707

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 347

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0122 / 5275

ON N KEDZIE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE

174.0

08/01/03

09/01/03

68,437 07/01/03

07/28/03

39,219

100

300 06 0122 / 5275

ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

14.50

08/01/03

09/01/03

5,688 07/01/03

07/28/03

3,119

100

300 06 0122 / 5275

ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE

87.50

08/01/03

09/01/03

34,219 07/01/03

07/28/03

19,610

100

300 09 / 33101

ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE

1.58

09/02/08

09/03/08

632 09/02/08

09/03/08

378

100

300 06 0122 / 5275

ON W IRVING PARK RD FROM N KEDZIE AVE TO N CHRISTIANA AVE

57.0

11/10/03

11/30/03

24,000 10/30/03

11/28/03

13,496

100

300 06 0122 / 5275

ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE

323.0

11/10/03

11/30/03

127,500 10/30/03

11/28/03

77,597

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

657.58

260,476

153,418

0

Fixtures

300 03 0033 / 4904

ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE

83.70

03/10/05

03/20/05

33,480

300 03 0033 / 4904

ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE

150.0

03/01/05

03/01/05

60,000

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

5.50

08/20/04

09/20/04

2,200 07/14/04

08/10/04

1,438

100

300 06 0122 / 5275

ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE

5.10

07/01/04

07/16/04

2,040 06/22/04

06/30/04

2,040

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

244.30

0

97,720

3,478

2,668,971

1,311,427

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 348

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0768 / 6954

4903 N ALBANY AVE

1.0

05/26/95

05/26/95

0 05/26/95

05/26/95

300

100

805 06 0736 / 6922

4923 N ALBANY AVE

1.0

05/26/95

05/26/95

0 05/26/95

05/26/95

300

100

805 06 0782 / 6968

4941 N ALBANY AVE

1.0

05/20/96

05/20/96

0 05/20/96

05/20/96

300

100

805 06 0887 / 7073

3940 N FRANCISCO AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0780 / 6966

4232 N FRANCISCO AVE

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 0879 / 7065

4325 N FRANCISCO AVE

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

300 06 0096 / 5258

3649 N KEDZIE AVE

905.0

03/01/03

09/01/03

0 03/01/06

09/01/06

27,344

0

302 00 0092 / 5774

3649 N KEDZIE AVE

15.0

0 03/12/01

12/12/01

3,535

100

805 06 1164 / 7350

3649 N KEDZIE AVE

1.0

03/15/96

03/15/96

0 03/15/96

03/15/96

300

100

805 06 1149 / 7335

4601 N KEDZIE AVE

1.0

03/23/95

03/23/95

0 03/23/95

03/23/95

300

100

805 06 1167 / 7353

4725 N KEDZIE AVE

1.0

06/21/95

06/21/95

0 06/21/95

06/21/95

300

100

805 06 1893 / 8079

3924 N MOZART ST

1.0

10/11/96

10/11/96

0 10/11/96

10/11/96

300

100

805 06 1894 / 8080

3940 N MOZART ST

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0686 / 6872

3822 N RICHMOND ST

1.0

10/11/96

10/11/96

0 10/11/96

10/11/96

300

100

805 06 0671 / 6857

3841 N RICHMOND ST

1.0

10/04/96

10/04/96

0 10/04/96

10/04/96

300

100

805 06 0700 / 6886

3630 N SACRAMENTO AVE

1.0

01/25/95

01/25/95

0 01/25/95

01/25/95

300

100

805 06 0702 / 6888

4220 N SACRAMENTO AVE

1.0

05/25/95

05/25/95

0 05/25/95

05/25/95

300

100

805 06 0703 / 6889

4242 N SACRAMENTO AVE

1.0

05/25/95

05/25/95

0 05/25/95

05/25/95

300

100

805 06 0656 / 6842

3700 N SPAULDING AVE

1.0

09/06/95

09/06/95

0 09/06/95

09/06/95

300

100

805 06 0364 / 6550

4937 N TROY ST

1.0

05/26/95

05/26/95

0 05/26/95

05/26/95

300

100

302 00 0092 / 5774

3406 W IRVING PARK RD

1.0

0 04/06/01

04/06/01

236

100

805 06 1895 / 8081

2855 W NELSON ST

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 1928 / 8114

2941 W NELSON ST

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

3649 N KEDZIE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

3649 N KEDZIE AVE

941.0

0

37,115

Lamps 738.0

06/01/07

12/31/07

21,726 07/31/07

08/18/07

21,726

100

0 05/18/02

05/21/02

11,708

100

Installations 643.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 349

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 11 / 32222

ON N ST LOUIS AVE FROM W WILSON AVE TO W LELAND AVE

300 06 0072 / 5235

3843 N CALIFORNIA AVE

302 00 0092 / 5774

3041 N FRANCISCO AVE

300 06 0167 / 5306

3731 N MOZART ST

300 06 0071 / 5234

2800 W IRVING PARK RD

302 00 0092 / 5774

2677 W MONTROSE AVE

300 06 0071 / 5234

2741 W MONTROSE AVE

302 00 0092 / 5774

2850 W NELSON ST

1.0

300 06 0069 / 5233

3253 W WILSON AVE

2.0

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting

11/01/07

11/10/07

2,200 10/11/07

10/11/07

2,200

08/03/01

09/28/01

0 07/02/01

07/03/01

2,379

6.0

0 09/27/01

09/27/01

2,421

100

1.0

0 12/07/99

12/07/99

351

100

0 10/19/00

10/19/00

1,350

100

0 08/21/01

08/21/01

404

100

0 10/19/00

10/19/00

3,600

100

0 10/10/01

10/10/01

345

100

970 11/18/02

11/18/02

1,183

100

4.0

1.0 01/01/00

11/20/02

12/30/00

11/20/02

15.0

3,170

100

14,233

Fixtures

300 11 / 32222

ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST

11.55

11/01/07

12/01/07

15,725 03/13/08

04/04/08

13,060

100

300 11 / 32222

ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST

13.86

11/01/07

12/01/07

18,843 03/13/08

04/04/08

17,538

100

300 11 / 32222

ON W MONTROSE AVE FROM N KEDZIE AVE TO N MANOR AVE

70.0

11/01/07

12/01/07

95,100 03/26/08

04/04/08

58,855

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

3649 N KEDZIE AVE

95.41

129,668

89,452

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 350

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Staggered Lighting 300 11 / 32222

ON N RICHMOND ST FROM W NELSON ST TO W FLETCHER ST

2.0

11/07/07

04/04/08

120,000 11/07/07

78,800

100

300 06 / 32146

ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE

2.0

12/05/07

03/28/07

227,000

0

95

300 06 / 32146

ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE

1.0

12/05/07

04/09/08

227,000

0

95

300 06 / 32146

ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE

1.0

12/05/07

05/29/08

227,000

0

95

300 06 0308 / 5414

ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE

1.0

03/16/06

12/31/06

103,808 09/26/06

12/22/06

69,825

100

300 11 / 32222

ON W FLETCHER ST FROM N FRANCISCO AVE TO N ALBANY AVE

2.0

11/07/07

04/04/08

120,000 11/07/07

04/04/08

78,800

100

300 06 0308 / 5414

ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE

1.0

03/16/06

12/31/06

103,808 09/26/06

12/22/06

69,825

100

300 06 / 32146

ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE

2.0

11/05/07

01/29/08

227,000

01/30/08

0

100

300 11 / 32222

ON W NELSON ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE

2.0

11/07/07

04/04/08

120,000 11/07/07

04/04/08

78,800

100

300 06 / 32277

ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE

.0

05/04/08

12/31/08

300 11 / 32222

ON W WELLINGTON AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE

1.0

11/08/07

04/04/08

15.0

Totals per Residntl Staggered Lighting

04/04/08

0 55,000 11/08/07

04/04/08

1,530,616

0

0

39,400

100

415,450

Blocks

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON N ALBANY AVE FROM W ARGYLE ST TO W CARMEN AVE

1.0

05/15/03

07/15/03

67,162 05/15/03

07/18/03

66,425

100

300 06 0267 / 5375

ON N ALBANY AVE FROM W ARGYLE ST TO W LAWRENCE AVE

2.0

04/10/04

06/10/04

140,910 04/06/04

05/10/04

131,091

100

300 06 0235 / 5349

ON W ARGYLE ST FROM N WHIPPLE ST TO N ALBANY AVE

1.0

05/15/03

07/15/03

67,162 05/15/03

07/18/03

66,424

100

4.0

Totals per Residntl Strt Lighting/Lamps

Work Type: Strt Light Pole Painting

263,940

Locations

300 03 0033 / 4904

ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE

300 09 / 33105

ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

300 03 0033 / 4904

ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE

302 00 0076 / 5764

ON N SACRAMENTO AVE FROM W WILSON AVE TO W LAWRENCE AVE

300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

4.95

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

300 06 0108 / 5263

ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE

300 04 0216 / 5114

ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE

Totals per Strt Light Pole Painting

275,234

99.51

03/01/05

03/20/05

13.0

09/10/08

09/24/08

162.0

03/01/05

03/20/05

09/01/00

12/31/00

05/15/07

06/01/07

1,089 05/15/07

06/01/07

1,089

100

5.35

05/10/04

09/10/04

1,610 05/10/04

08/01/04

1,445

100

143.65

08/01/04

08/15/04

41,948 06/21/04

07/28/04

31,743

100

12.0

05/01/06

11/01/06

2,596 05/17/06

07/25/06

2,596

100

440.46

26,412 3,900 09/10/08

0 09/24/08

53,000

100

0

0

130,554

2,730

0

39,602

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 351

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0199 / 5324

Blocks

ON W EDDY ST FROM N ALBANY AVE TO N TROY ST

Work Type: Strt Lighting

10/12/01

10/26/01

26,450 08/12/01

08/22/01

30,493

100

Blocks

300 06 0247 / 5357

ON W BERTEAU AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE

2.0

05/12/03

07/03/03

80,000 05/07/03

07/16/03

77,780

100

300 06 0247 / 5357

ON W WAVELAND AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE

2.0

05/23/03

07/21/03

80,000 05/20/03

07/16/03

76,132

100

4.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

3649 N KEDZIE AVE

Work Type: Underpass Lighting

160,000

153,912

Lamps 1,486.0

03/01/04

12/01/04

7,727 10/24/06

11/02/06

16,183

100

Fixtures

805 06 2299 / 8485

3201 N KEDZIE AVE

10.0

11/17/92

11/17/92

0 11/17/92

11/17/92

7,500

100

300 06 0217 / 5337

3649 N KEDZIE AVE

456.0

04/27/04

05/03/04

25,631 05/11/04

05/14/04

17,217

100

805 06 2295 / 8481

3725 S ALBANY AVE

26.0

11/19/93

11/19/93

0 11/19/93

11/19/93

19,500

100

805 06 2812 / 8998

3630 S CALIFORNIA AVE

22.0

03/05/93

03/05/93

0 03/05/93

03/05/93

16,500

100

Totals per Underpass Lighting

514.0

25,631

60,717

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 352

1/1/2008 AND 12/31/2008

Ward 33 Richard F. Mell CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Locations

Work Type: LED Signal Head Install 210 06 0130 / 4389

N CENTRAL PARK AVE AND W IRVING PARK RD

1.0

0 04/03/02

04/03/02

8,539

100

210 06 0130 / 4389

N KEDZIE AVE AND W ARGYLE ST

.50

0 08/26/02

08/26/02

925

100

1.50

Totals per LED Signal Head Install

0

9,464

Locations

Work Type: Left Turn Arrow 210 06 / 32040

N CALIFORNIA AVE AND W IRVING PARK RD

1.0

11/01/06

12/31/08

120,822

100

210 06 0231 / 4470

N ELSTON AVE AND W IRVING PARK RD

.0

03/01/08

12/01/08

121,474

0

0

210 06 / 32157

N KEDZIE AVE AND W LAWRENCE AVE

.0

11/01/08

02/28/09

51,000

0

0

210 06 0158 / 5058

Awaiting for a responce from obm Note Last Updated on 04-OCT-07 W LAWRENCE AVE AND N KIMBALL AVE

.50

06/22/06

12/31/07

30,000 06/22/06

22,347

95

85,000 02/08/07

08/24/07

NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07 1.50

Totals per Left Turn Arrow

Work Type: Signals 300 06 0096 / 5258

287,474

143,169

Intersections

3649 N KEDZIE AVE

Work Type: TSM Install

39.0

10/01/03

10/08/03

0 09/30/06

10/07/06

6,167

100

Locations

814 06 0087 / 16303

2890 N CALIFORNIA AVE

1.0

10/04/94

10/04/94

0 10/04/94

10/04/94

62,421

100

814 06 0287 / 16499

3930 N CENTRAL PARK AVE

1.0

11/26/91

11/26/91

0 11/26/91

11/26/91

123,207

100

814 06 0385 / 16573

3200 N SACRAMENTO AVE

1.0

04/18/91

04/18/91

0 04/18/91

04/18/91

96,382

100

814 06 0193 / 16405

4000 N SACRAMENTO AVE

1.0

10/20/95

10/20/95

0 10/20/95

10/20/95

125,000

100

814 06 0199 / 16411

4800 N SACRAMENTO AVE

1.0

08/14/96

08/14/96

0 08/14/96

08/14/96

150,000

100

814 06 0084 / 16300

3176 W BELMONT AVE

1.0

05/19/95

05/19/95

0 05/19/95

05/19/95

161,287

100

6.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

Totals per Traffic

0

718,297

Locations 1.65

05/15/07

06/01/07

512 05/15/07

06/01/07

512

287,986

877,608

Totals per Construction Phase

2,956,957

2,189,035

Totals for Ward 33

2,973,657

2,198,741

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 353

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 11 / 32223

ON S ABERDEEN ST FROM W 114TH PL TO W 115TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S ASHLAND AVE FROM W 116TH ST TO W 117TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S ASHLAND AVE FROM W 118TH ST TO W 119TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S ASHLAND AVE FROM W 122ND ST TO W 123RD ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S CARPENTER ST FROM W 116TH ST TO W 117TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S ELIZABETH ST FROM W 117TH ST TO W 118TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S EMERALD AVE FROM W 108TH ST TO W 109TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S EMERALD AVE FROM W 110TH ST TO W 111TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S EMERALD AVE FROM W 112TH ST TO W 113TH ST

.0

03/14/07

04/18/07

0

0

0

300 11 / 32223

ON S GREEN ST FROM W 103RD ST TO W 104TH ST

.0

03/14/07

04/18/07

0

0

0

300 06 0274 / 5382

ON S GREEN ST FROM W 107TH ST TO W 110TH ST

.0

07/01/04

12/31/04

0 03/22/05

6,183

100

300 11 / 32223

ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST

.0

10/26/07

11/02/07

0

0

0

300 06 / 32277

ON S PEORIA ST FROM W 103RD ST TO W 104TH ST

.0

04/01/08

08/30/08

0

0

0

300 06 0274 / 5382

ON S PEORIA ST FROM W 107TH ST TO W 110TH ST

.0

07/01/04

12/31/04

0 03/22/05

11/10/06

6,183

100

300 06 0308 / 5414

ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

0

0

300 06 0274 / 5382

ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST

.0

07/01/04

12/31/04

0 03/22/05

11/10/06

6,183

100

300 06 0274 / 5382

ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST

.0

07/01/04

12/31/04

0 03/22/05

11/10/06

6,183

100

300 11 / 32223

ON W 111TH ST FROM S STATE ST TO S PERRY AVE

.0

03/14/07

04/18/07

7,500 03/14/07

04/18/07

0

100

300 06 / 32277

ON W 113TH PL FROM S STATE ST TO S PERRY AVE

.0

04/01/08

08/30/08

0

0

0

300 06 / 32277

ON W 113TH ST FROM S STATE ST TO S PERRY AVE

.0

04/01/08

08/30/08

0

0

0

210 06 0243 / 4480

W 119TH ST AND S HALSTED ST

.0

0

0

0

210 06 0243 / 4480

W 99TH ST AND S HALSTED ST

.0

0

0

0

300 06 / 32275

11900-12100 S YALE AVE

.0

03/01/07

10/31/07

3,900 03/01/07

03/22/07

2,495

100

300 06 0292 / 5399

849 W 115TH ST

1.0

05/27/05

07/25/05

1,000 05/27/05

07/25/05

475

100

Totals per Design/Engineering

1.0

12,400

10/05/05

27,702

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 354

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON S EMERALD AVE FROM W 119TH ST TO W 122ND ST

8.0

10/25/01

10/27/01

1,414 09/29/01

09/29/01

1,624

100

300 09 / 33100

ON W 104TH PL FROM S MORGAN ST TO S RACINE AVE

7.0

02/01/08

12/31/08

2,800 09/02/08

09/05/08

1,925

100

300 06 0069 / 5233

800-1014 E 104TH ST

7.0

2,625 05/08/02

05/08/02

2,625

100

302 00 0092 / 5774

11839 S BISHOP ST

1.0

09/25/01

09/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

11629 S GREEN ST

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

206

100

302 00 0092 / 5774

11914-11945 S LOWE AVE

4.0

10/25/01

10/27/01

1,178 09/29/01

09/29/01

824

100

302 00 0092 / 5774

10232 S MORGAN ST

1.0

10/20/01

10/21/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

11832 S STEWART AVE

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

12039 S UNION AVE

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

12051 S UNION AVE

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

12017 S WALLACE ST

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

11731 S YALE AVE

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

215-341 W 111TH PL

8.0

10/20/01

10/21/01

1,885 09/29/01

09/29/01

1,885

100

302 00 0092 / 5774

307 W 118TH ST

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

302 00 0092 / 5774

751 W 118TH ST

1.0

10/25/01

10/27/01

236 09/29/01

09/29/01

236

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 07 0034 / 5457

ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

Totals per 400 Watt Changeout Totals per Lighting/Electrical

44.0

12,262

11,213

Fixtures 25.0

09/05/06

09/15/06

10,000 09/28/06

10/12/06

13,152

100

7.0

12/15/08

01/09/09

2,800 12/15/08

01/09/09

2,366

100

32.0

12,800

15,518

2,139,061

2,015,857

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 355

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 300 06 0069 / 5233

ON W 112TH PL FROM S MAY ST TO S LAFLIN ST

300 06 0069 / 5233

ON W 112TH ST FROM S ABERDEEN ST TO S THROOP ST

300 06 0069 / 5233

ON W 112TH ST FROM S RACINE AVE TO S LAFLIN ST

300 06 0069 / 5233

Installations 14.0

0 07/17/02

07/17/02

4,900

100

5.0

0 07/16/02

07/16/02

1,750

100

14.0

0 07/17/02

07/17/02

4,900

100

ON W 115TH ST FROM S MAY ST TO S JUSTINE ST

3.0

0 07/23/02

07/23/02

1,050

100

300 06 0069 / 5233

9956 S ABERDEEN ST

1.0

0 07/12/02

07/12/02

350

100

300 06 0069 / 5233

10054 S ABERDEEN ST

1.0

0 07/19/02

07/19/02

350

100

300 06 0069 / 5233

10114-10142 S ABERDEEN ST

3.0

0 07/12/02

07/12/02

1,050

100

300 06 0204 / 5327

10241 S ABERDEEN ST

1.0

08/08/01

08/08/01

320 09/29/01

09/29/01

320

100

805 06 1552 / 7738

12221 S ABERDEEN ST

1.0

10/14/97

10/14/97

0 10/14/97

10/14/97

300

100

805 06 1574 / 7760

12257 S ABERDEEN ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1553 / 7739

12258 S ABERDEEN ST

1.0

10/14/97

10/14/97

0 10/14/97

10/14/97

300

100

300 06 0069 / 5233

11313 S BISHOP ST

1.0

01/15/03

01/15/03

350 01/13/03

01/13/03

301

100

302 00 0092 / 5774

11518 S BISHOP ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11554 S BISHOP ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11626 S BISHOP ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11636 S BISHOP ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11736 S BISHOP ST

1.0

0 10/04/01

10/09/01

236

100

805 06 1697 / 7883

11759 S BISHOP ST

1.0

0 06/23/97

06/23/97

300

100

300 06 0069 / 5233

9954 S CARPENTER ST

1.0

0 07/12/02

07/12/02

350

100

302 00 0092 / 5774

11559 S CARPENTER ST

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

11658 S CARPENTER ST

1.0

0 07/15/02

07/15/02

350

100

805 06 1571 / 7757

12208 S CARPENTER ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1563 / 7749

12257 S CARPENTER ST

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

302 00 0092 / 5774

12258 S EMERALD AVE

1.0

0 01/17/02

01/17/02

236

100

300 06 0069 / 5233

10701-10758 S GLENROY AVE

5.0

0 07/15/02

07/15/02

1,750

100

805 06 1569 / 7755

12150 S GREEN ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1570 / 7756

12156 S GREEN ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1585 / 7771

12257 S GREEN ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1097 / 7283

12803 S GREEN ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 1098 / 7284

12815 S GREEN ST

1.0

08/22/95

08/22/95

0 08/22/95

08/22/95

300

100

805 06 1127 / 7313

10958 S HALSTED ST

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

06/23/97

06/23/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 356

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1683 / 7869

11112 S HALSTED ST

1.0

0 06/25/97

06/25/97

300

100

302 00 0092 / 5774

11710 S HALSTED ST

1.0

0 01/23/02

01/23/02

236

100

302 00 0092 / 5774

11736 S HALSTED ST

1.0

0 01/23/02

01/23/02

236

100

302 00 0092 / 5774

11759 S HALSTED ST

1.0

0 01/23/02

01/23/02

236

100

302 00 0092 / 5774

11800 S HALSTED ST

1.0

0 01/18/02

01/18/02

236

100

805 06 1608 / 7794

11511 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1609 / 7795

11514 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1611 / 7797

11533 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1612 / 7798

11538 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1613 / 7799

11600 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1614 / 7800

11617 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1615 / 7801

11636 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1725 / 7911

11658 S JUSTINE ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1616 / 7802

11740 S JUSTINE ST

1.0

09/22/97

09/22/97

0 09/22/97

09/22/97

300

100

805 06 1729 / 7915

11758 S JUSTINE ST

1.0

05/29/97

05/29/97

0 05/29/97

05/29/97

300

100

302 00 0092 / 5774

10730 S LA SALLE ST

1.0

0 12/27/01

12/27/01

236

100

300 06 0069 / 5233

11806-11816 S LA SALLE ST

2.0

0 07/15/02

07/15/02

700

100

805 06 1592 / 7778

10522 S LAFAYETTE AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1593 / 7779

10554 S LAFAYETTE AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1595 / 7781

10610 S LAFAYETTE AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1588 / 7774

11536 S LAFLIN ST

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

805 06 1696 / 7882

11659 S LAFLIN ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1589 / 7775

11754 S LAFLIN ST

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

300 06 0069 / 5233

11253-11258 S LOOMIS ST

2.0

0 07/16/02

07/16/02

700

100

302 00 0092 / 5774

11719 S LOOMIS ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11737 S LOOMIS ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11757 S LOOMIS ST

1.0

0 10/04/01

10/09/01

236

100

805 06 1698 / 7884

11836 S LOOMIS ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1665 / 7851

11012 S LOWE AVE

1.0

08/18/97

08/18/97

0 08/18/97

08/18/97

300

100

805 06 1846 / 8032

12218 S LOWE AVE

1.0

03/13/96

03/13/96

0 03/13/96

03/13/96

300

100

805 06 1848 / 8034

12223 S LOWE AVE

1.0

03/13/96

03/13/96

0 03/13/96

03/13/96

300

100

06/25/97

06/25/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 357

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0069 / 5233

9957-10048 S MAY ST

3.0

0 07/19/02

07/19/02

1,050

100

300 06 0069 / 5233

11250 S MAY ST

1.0

0 07/16/02

07/16/02

350

100

302 00 0092 / 5774

11559 S MAY ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11601 S MAY ST

1.0

0 10/04/01

10/09/01

236

100

805 06 1561 / 7747

12204 S MAY ST

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

805 06 1577 / 7763

12204 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1562 / 7748

12209 S MAY ST

1.0

09/29/97

09/29/97

0 09/29/97

09/29/97

300

100

805 06 1578 / 7764

12209 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1579 / 7765

12215 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1580 / 7766

12218 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1582 / 7768

12241 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1584 / 7770

12244 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1586 / 7772

12258 S MAY ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

302 00 0092 / 5774

11514 S MORGAN ST

1.0

0 10/04/01

10/09/01

236

100

805 06 1573 / 7759

12243 S MORGAN ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1955 / 8141

12717 S MORGAN ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 1956 / 8142

12901 S MORGAN ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 0608 / 6794

11506 S PARNELL AVE

1.0

04/03/95

04/03/95

0 04/03/95

04/03/95

300

100

300 06 0069 / 5233

10118-10156 S PEORIA ST

3.0

0 07/23/02

07/23/02

1,050

100

805 06 1566 / 7752

12217 S PEORIA ST

1.0

09/30/97

09/30/97

0 09/30/97

09/30/97

300

100

805 06 1557 / 7743

12228 S PEORIA ST

1.0

10/17/97

10/17/97

0 10/17/97

10/17/97

300

100

805 06 1567 / 7753

12228 S PEORIA ST

1.0

09/30/97

09/30/97

0 09/30/97

09/30/97

300

100

805 06 1581 / 7767

12237 S PEORIA ST

1.0

09/26/97

09/26/97

0 09/26/97

09/26/97

300

100

805 06 1572 / 7758

12238 S PEORIA ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1546 / 7732

12257 S PEORIA ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1547 / 7733

12258 S PEORIA ST

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 0548 / 6734

12806 S PEORIA ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 0532 / 6718

12814 S PEORIA ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 0550 / 6736

12841 S PEORIA ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

302 00 0092 / 5774

11654 S PRINCETON AVE

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

10123-10143 S RACINE AVE

2.0

0 07/19/02

07/19/02

700

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 358

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0069 / 5233

11401-11421 S RACINE AVE

2.0

0 07/16/02

07/16/02

700

100

300 06 0069 / 5233

11424-11432 S RACINE AVE

2.0

0 07/23/02

07/23/02

700

100

302 00 0092 / 5774

11557 S RACINE AVE

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

11558 S RACINE AVE

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

11701 S RACINE AVE

1.0

0 07/15/02

07/15/02

350

100

805 06 1705 / 7891

12125 S RACINE AVE

1.0

0 06/24/97

06/24/97

300

100

300 06 0069 / 5233

10056-10154 S SANGAMON ST

4.0

0 07/12/02

07/12/02

1,400

100

805 06 1787 / 7973

12201 S SANGAMON ST

1.0

10/09/87

10/09/87

0 10/09/87

10/09/87

300

100

805 06 0635 / 6821

12805 S SANGAMON ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 0636 / 6822

12806 S SANGAMON ST

1.0

08/23/95

08/23/95

0 08/23/95

08/23/95

300

100

805 06 1617 / 7803

10432 S STATE ST

1.0

09/24/97

09/24/97

0 09/24/97

09/24/97

300

100

805 06 1594 / 7780

10558 S STATE ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 0448 / 6634

12245 S STEWART AVE

1.0

09/21/95

09/21/95

0 09/21/95

09/21/95

300

100

300 06 0069 / 5233

11443 S THROOP ST

1.0

0 07/23/02

07/23/02

350

100

805 06 0346 / 6532

12209 S UNION AVE

1.0

03/13/96

03/13/96

0 03/13/96

03/13/96

300

100

805 06 0384 / 6570

10857 S WALLACE ST

1.0

04/16/96

04/16/96

0 04/16/96

04/16/96

300

100

805 06 0385 / 6571

11000 S WALLACE ST

1.0

07/31/96

07/31/96

0 07/31/96

07/31/96

300

100

805 06 1650 / 7836

10334 S WENTWORTH AVE

1.0

09/11/97

09/11/97

0 09/11/97

09/11/97

300

100

805 06 1620 / 7806

10454 S WENTWORTH AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1596 / 7782

10650 S WENTWORTH AVE

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1626 / 7812

10900 S WENTWORTH AVE

1.0

09/17/97

09/17/97

0 09/17/97

09/17/97

300

100

300 06 0069 / 5233

1101-1155 W 101ST ST

2.0

0 07/19/02

07/19/02

700

100

300 06 0069 / 5233

1125-1133 W 101ST ST

2.0

0 07/12/02

07/12/02

700

100

300 06 0069 / 5233

1156 W 102ND ST

1.0

0 07/19/02

07/19/02

350

100

300 06 0204 / 5327

1058 W 103RD ST

1.0

08/08/01

08/08/01

320 09/29/01

09/29/01

320

100

805 06 1618 / 7804

23 W 104TH PL

1.0

09/24/97

09/24/97

0 09/24/97

09/24/97

300

100

805 06 1607 / 7793

63 W 104TH PL

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

805 06 1631 / 7817

143 W 104TH PL

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

805 06 1632 / 7818

215 W 104TH PL

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

805 06 1633 / 7819

225 W 104TH PL

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

805 06 1635 / 7821

311 W 104TH PL

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

06/24/97

06/24/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 359

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1627 / 7813

118 W 105TH ST

1.0

09/17/97

09/17/97

0 09/17/97

09/17/97

300

100

805 06 1634 / 7820

246 W 105TH ST

1.0

09/19/97

09/19/97

0 09/19/97

09/19/97

300

100

302 00 0092 / 5774

264 W 107TH PL

1.0

0 01/18/02

01/18/02

236

100

805 06 0932 / 7118

338 W 109TH ST

1.0

09/21/95

09/21/95

0 09/21/95

09/21/95

300

100

805 06 0957 / 7143

433 W 110TH PL

1.0

07/02/96

07/02/96

0 07/02/96

07/02/96

300

100

805 06 1709 / 7895

443 W 111TH ST

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

805 06 1710 / 7896

500 W 111TH ST

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

300 06 0139 / 5289

507 W 111TH ST

2,100.0

03/01/06

09/01/06

51,217 07/01/06

07/18/06

63,449

100

302 00 0092 / 5774

507 W 111TH ST

65.0

0 01/30/01

01/24/02

15,317

100

805 06 1605 / 7791

524 W 111TH ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 1576 / 7762

534 W 111TH ST

1.0

09/25/97

09/25/97

0 09/25/97

09/25/97

300

100

805 06 0940 / 7126

319 W 112TH PL

1.0

11/08/95

11/08/95

0 11/08/95

11/08/95

300

100

300 06 0069 / 5233

1101-1157 W 112TH PL

3.0

0 07/16/02

07/16/02

1,050

100

805 06 1628 / 7814

43 W 112TH ST

1.0

09/17/97

09/17/97

0 09/17/97

09/17/97

300

100

300 06 0069 / 5233

1427 W 112TH ST

1.0

01/15/03

01/15/03

350 01/13/03

01/13/03

301

100

805 06 0942 / 7128

350 W 113TH ST

1.0

09/01/95

09/01/95

0 09/01/95

09/01/95

300

100

805 06 0943 / 7129

12 W 115TH ST

1.0

11/13/96

11/13/96

0 11/13/96

11/13/96

300

100

805 06 0945 / 7131

13 W 115TH ST

1.0

08/05/96

08/05/96

0 08/05/96

08/05/96

300

100

302 00 0092 / 5774

956 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1035 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1150 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

1218 W 115TH ST

1.0

0 07/15/02

07/15/02

350

100

302 00 0092 / 5774

1218 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1223 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1227 W 115TH ST

1.0

0 10/04/01

10/09/01

236

100

805 06 1603 / 7789

1525 W 115TH ST

1.0

0 09/25/97

09/25/97

300

100

302 00 0092 / 5774

307 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

321 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

322 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

354 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

422 W 116TH ST

1.0

0 07/15/02

07/15/02

350

100

09/25/97

09/25/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 360

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0092 / 5774

422 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

503 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

522 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

951 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

959 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1003 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

1025 W 116TH ST

1.0

0 07/15/02

07/15/02

350

100

302 00 0092 / 5774

1105 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

302 00 0092 / 5774

1219 W 116TH ST

1.0

0 10/04/01

10/09/01

236

100

300 06 0069 / 5233

105-123 W 118TH ST

2.0

0 07/15/02

07/15/02

700

100

805 06 1699 / 7885

1400 W 119TH ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1700 / 7886

1420 W 119TH ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1702 / 7888

1434 W 119TH ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 1706 / 7892

1456 W 119TH ST

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

805 06 1703 / 7889

1500 W 119TH ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

805 06 0946 / 7132

535 W 123RD ST

1.0

03/28/96

03/28/96

0 03/28/96

03/28/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

507 W 111TH ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

507 W 111TH ST

2,389.0

52,557

147,648

Lamps 1,622.0

06/01/07

12/31/07

47,751 01/10/08

01/28/08

46,308

100

0 08/21/02

09/03/02

27,622

100

Installations 1,517.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 361

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 07 0034 / 5457

ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST

8.0

4,000 09/01/06

09/11/06

4,208

100

302 00 0092 / 5774

330 W 104TH ST

1.0

0 08/22/01

08/22/01

345

100

302 00 0092 / 5774

111 W 108TH PL

1.0

0 06/20/01

06/20/01

471

100

302 00 0092 / 5774

127 W 108TH PL

1.0

0 06/20/01

06/20/01

471

100

302 00 0092 / 5774

141 W 108TH PL

1.0

0 06/20/01

06/20/01

471

100

302 00 0092 / 5774

153 W 108TH PL

1.0

0 06/20/01

06/20/01

471

100

300 06 0167 / 5306

314 W 108TH ST

3.0

0 04/08/99

04/08/99

1,053

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

849 W 115TH ST

Work Type: Ornamental - Piggyback Lighting 300 07 0034 / 5457

ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 300 11 / 32223

ON W 111TH ST FROM S STATE ST TO S PERRY AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

507 W 111TH ST

09/05/06

09/15/06

16.0

4,000

7,490

Projects .0

03/01/05

12/31/05

0 08/11/05

08/11/05

0

100

25.0

09/05/06

09/15/06

33,750 09/28/06

10/12/06

21,406

100

7.0

12/15/08

01/09/09

9,450 12/15/08

01/09/09

8,022

100

Fixtures

32.0

43,200

29,428

Blocks 1.0

06/01/07

09/15/07

03/01/08

12/01/08

350,000 06/01/07

01/18/08

329,000

100

0

0

Lamps .0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 362

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 06 0298 / 5405

ON S JUSTINE ST FROM W 120TH ST TO W 121ST ST

1.0

06/25/05

07/25/05

0 06/13/05

08/12/05

59,100

100

300 06 0298 / 5405

ON S LAFLIN ST FROM W 120TH ST TO W 121ST ST

1.0

07/01/05

09/01/05

0 06/13/05

08/12/05

59,100

100

300 11 / 32223

ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST

.0

11/07/07

12/07/07

0

0

0

300 06 / 32277

ON S PEORIA ST FROM W 103RD ST TO W 104TH ST

.0

05/04/08

12/31/08

0

0

0

300 06 0308 / 5414

ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST

2.0

06/13/06

09/20/06

148,758 06/13/06

09/20/06

146,295

100

300 07 0034 / 5457

ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST

2.0

06/12/06

08/18/06

50,000 06/13/06

09/20/06

50,000

100

300 06 / 32277

ON W 113TH PL FROM S STATE ST TO S PERRY AVE

.0

05/04/08

12/31/08

0

0

0

300 06 / 32277

ON W 113TH ST FROM S STATE ST TO S PERRY AVE

.0

05/04/08

12/31/08

0

0

0

300 06 / 32275

11900-12100 S YALE AVE

2.0

04/01/07

12/31/07

90,006

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

8.0

153,104 04/06/07

07/06/07

351,862

404,501

Blocks

300 06 0235 / 5349

ON S JUSTINE ST FROM W 121ST ST TO W 123RD ST

1.0

10/01/03

12/01/03

109,352 08/25/03

10/27/03

81,113

100

300 06 0267 / 5375

ON W 107TH PL FROM S MORGAN ST TO S ABERDEEN ST

2.0

09/20/04

11/20/04

148,413 08/31/04

12/10/04

142,617

100

300 06 0235 / 5349

ON W 109TH ST FROM S MORGAN ST TO S BEVERLY AVE

1.0

03/03/03

05/14/03

93,962 04/17/03

07/18/03

87,636

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

4.0

351,727

311,366

Locations

302 00 0092 / 5774

11500 S RACINE AVE

2.0

0 02/16/01

02/16/01

756

100

302 00 0092 / 5774

11613 S RACINE AVE

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

11651 S RACINE AVE

1.0

0 02/16/01

02/16/01

378

100

302 00 0092 / 5774

11700 S RACINE AVE

1.0

0 02/16/01

02/16/01

378

100

5.0

0

Totals per Short Arm Installs - Residntl

1,890

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 363

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 07 0034 / 5457

ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST

302 00 0076 / 5764

ON S HALSTED ST FROM W 103RD ST TO W 119TH ST

300 09 / 33075

ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE

300 07 0034 / 5457

Locations 25.0

11/17/05

04/03/06

6,250 05/20/06

06/01/06

7,000

100

300.0

03/20/98

04/16/98

0 03/20/98

04/16/98

5,100

100

7.0

09/05/08

09/12/08

2,100 09/05/08

09/12/08

1,470

100

ON W 111TH ST FROM S HALSTED ST TO S PERRY AVE

.0

04/18/06

11/18/06

2,700

0

100

300 07 0034 / 5457

ON W 111TH ST FROM S PERRY AVE TO S HALSTED ST

60.0

04/18/06

11/18/06

15,452 06/06/07

07/01/07

0

100

300 09 / 33100

11200-11300 S GREEN ST

4.0

07/01/08

07/07/08

800 07/01/08

07/07/08

504

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

396.0

27,302

14,074

Blocks

300 06 0247 / 5357

ON S ABERDEEN ST FROM W 122ND ST TO W 123RD ST

1.0

09/01/03

10/01/03

115,000 09/30/04

06/17/05

100,162

100

300 06 0247 / 5357

ON S DAVOL ST FROM W EDMAIRE ST TO W MONTEREY AVE

2.0

08/01/03

10/01/03

118,000 08/01/03

09/23/03

117,028

100

300 06 0274 / 5382

ON S GREEN ST FROM W 107TH ST TO W 110TH ST

3.0

11/04/05

12/18/06

225,000 11/04/05

12/18/06

103,028

100

300 06 0274 / 5382

ON S PEORIA ST FROM W 107TH ST TO W 110TH ST

3.50

11/04/05

12/18/06

265,000 11/04/05

12/18/06

103,028

100

300 06 0274 / 5382

ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST

.50

04/27/06

12/18/06

40,000 04/27/06

12/18/06

103,028

100

300 06 0274 / 5382

ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST

1.50

04/27/06

12/18/06

115,000 04/27/06

12/18/06

103,028

100

300 06 0204 / 5327

10200-10299 S ABERDEEN ST

4.0

10/08/01

10/08/01

840 09/29/01

09/29/01

840

100

15.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

507 W 111TH ST

Work Type: Underpass Lighting 805 06 2357 / 8543

500 E 115TH ST

878,840

630,142

Lamps 1,300.0

03/01/04

12/01/04

6,760 07/31/06

08/14/06

14,157

100

03/26/96

03/26/96

0 03/26/96

03/26/96

25,500

100

Fixtures 34.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 364

1/1/2008 AND 12/31/2008

Ward 34 Carrie M Austin CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install

Locations

210 06 0243 / 4480

W 119TH ST AND S HALSTED ST

.0

04/01/06

04/01/07

0

0

0

210 06 0243 / 4480

W 99TH ST AND S HALSTED ST

.0

04/01/06

04/01/07

0

0

0

0

0

Totals per Pedestrian Countdown Signal Install

.0

Work Type: Removal Temp Wiring - Signals

Crossings

S HALSTED ST AND W VERMONT ST

1.0

300 06 0197 / 5322

Work Type: Signals 300 06 0096 / 5258

507 W 111TH ST

Work Type: TSM Install

4,000 04/27/01

05/08/01

4,603

100

0 08/08/03

08/18/03

3,795

100

Intersections 24.0

08/11/03

08/22/03

Locations

814 06 0236 / 16448

10700 S HALSTED ST

1.0

01/01/90

01/01/90

0 01/01/90

01/01/90

8,000

100

210 06 0107 / 4367

11900 S HALSTED ST

1.0

06/01/01

12/01/01

150,000 05/31/01

01/01/02

182,777

100

814 06 0129 / 16343

11100 S HAMLET AVE

1.0

06/29/94

06/29/94

0 06/29/94

06/29/94

85,414

100

814 06 0128 / 16342

11100 S MARSHFIELD AVE

1.0

06/29/94

06/29/94

0 06/29/94

06/29/94

52,414

100

814 06 0249 / 16461

10300 S WENTWORTH AVE

1.0

08/04/89

08/04/89

0 08/04/89

08/04/89

96,863

100

5.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 07 0034 / 5457

ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST

Totals per Traffic

150,000

425,468

Locations 1.0

11/17/05

04/03/06

200 05/20/06

06/01/06

282

154,200

434,148

Totals per Construction Phase

2,293,261

2,450,005

Totals for Ward 34

2,305,661

2,477,707

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 365

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32146

ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

.50

05/01/07

10/31/07

0

0

100

300 06 / 32146

ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

.50

05/01/07

10/31/07

0

0

100

300 06 0308 / 5414

ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE

.0

02/01/06

07/31/06

0 02/01/06

3,127

100

300 06 / 32146

ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

.0

05/01/07

10/31/07

5,000

2,500

100

300 06 / 32277

.0

04/01/08

08/30/08

0

0

0

210 06 0208 / 4451

ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT BLVD W ADDISON ST AND N LAWNDALE AVE

.0

07/01/04

10/01/04

300 06 0282 / 5390

3326 W FULLERTON AVE

1.0

09/15/04

09/15/04

Totals per Design/Engineering

2.0

07/31/06

0 1,700 09/01/04 6,700

09/15/04

0

0

1,627

100

7,254

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 366

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE

4.0

11/05/01

11/05/01

1,029 10/04/01

10/04/01

824

100

300 09 / 33101

ON N CHRISTIANA AVE FROM W WELLINGTON AVE TO W BARRY AVE

3.0

09/02/08

09/05/08

1,200 09/02/08

09/05/08

717

100

302 00 0092 / 5774

ON N HAMLIN AVE FROM W ALTGELD ST TO W DIVERSEY AVE

18.0

11/10/01

11/10/01

2,058 10/09/01

10/09/01

3,708

100

300 09 / 33101

ON N HAMLIN AVE FROM W ALTGELD ST TO W PALMER ST

9.0

09/11/08

09/15/08

3,800 09/11/08

09/15/08

2,151

100

300 06 0069 / 5233

ON N HAMLIN AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

9.0

10/01/02

10/01/02

3,789 09/25/02

09/25/02

1,877

100

302 00 0092 / 5774

ON N LAWNDALE AVE FROM W ALTGELD ST TO W DIVERSEY AVE

10.0

11/10/01

11/10/01

2,058 10/09/01

10/09/01

1,648

100

300 06 0069 / 5233

ON N LAWNDALE AVE FROM W BELDEN AVE TO W DIVERSEY AVE

15.0

0 02/04/02

02/04/02

5,625

100

300 09 / 33101

ON N LAWNDALE AVE FROM W BELDEN AVE TO W FULLERTON AVE

1.0

09/02/08

09/05/08

400 09/02/08

09/05/08

239

100

302 00 0092 / 5774

ON N MONTICELLO AVE FROM W ALTGELD ST TO W DIVERSEY AVE

5.0

11/05/01

11/05/01

2,058 10/09/01

10/09/01

1,029

100

300 09 / 33101

ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE

.08

09/02/08

09/03/08

32 09/02/08

09/03/08

19

100

302 00 0092 / 5774

ON N RIDGEWAY AVE FROM W ALTGELD ST TO W DIVERSEY AVE

9.0

11/01/01

11/01/01

2,058 10/04/01

10/04/01

1,854

100

300 06 0069 / 5233

ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

10.0

10/01/02

10/01/02

4,211 09/25/02

09/25/02

2,086

100

300 09 / 33101

ON N SAWYER AVE FROM W BARRY AVE TO W BELMONT AVE

5.0

09/02/08

09/05/08

2,200 09/02/08

09/05/08

1,175

100

300 09 / 33101

5.0

09/03/08

09/08/08

2,200 09/03/08

09/08/08

1,175

100

300 09 / 33101

ON N SPAULDING AVE FROM N MILWAUKEE AVE TO W WRIGHTWOOD AVE ON N SPAULDING AVE FROM W BARRY AVE TO W WELLINGTON AVE

4.0

09/03/08

09/05/08

1,800 09/03/08

09/05/08

956

100

300 09 / 33101

ON N ST LOUIS AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE

8.0

09/05/08

09/09/08

3,400 09/05/08

09/09/08

1,912

100

300 09 / 33101

ON N TROY ST FROM W WELLINGTON AVE TO W BARRY AVE

3.0

09/02/08

09/04/08

1,200 09/02/08

09/04/08

717

100

300 06 0069 / 5233

ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE

2.64

10/01/03

10/16/03

0 02/04/02

02/04/02

990

100

300 09 / 33101

ON W GRACE ST FROM N CENTRAL PARK AVE TO N MONTICELLO AVE

2.0

09/02/08

09/05/08

800 09/02/08

09/05/08

478

100

300 09 / 33101

ON W LYNDALE ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE

8.0

09/15/08

09/16/08

3,400 09/15/08

09/16/08

1,912

100

300 09 / 33101

ON W SCHUBERT AVE FROM N FRANCISCO AVE TO N KEDZIE AVE

6.0

09/02/08

09/05/08

2,600 09/02/08

09/05/08

1,434

100

300 09 / 33101

ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO W PALMER BLVD

9.0

09/16/08

09/19/08

3,800 09/16/08

09/19/08

2,151

100

302 00 0092 / 5774

2500 N MAPLEWOOD AVE

1.0

02/09/03

02/09/03

225 02/07/03

02/07/03

203

100

302 00 0092 / 5774

2542 N MONTICELLO AVE

1.0

01/12/02

01/12/02

210 01/09/02

01/09/02

203

100

302 00 0092 / 5774

2552 N MONTICELLO AVE

1.0

01/12/02

01/12/02

210 01/09/02

01/09/02

203

100

302 00 0092 / 5774

2610 N MONTICELLO AVE

1.0

01/12/02

01/12/02

210 01/09/02

01/09/02

203

100

302 00 0092 / 5774

2620 N MONTICELLO AVE

1.0

01/12/02

01/12/02

210 01/09/02

01/09/02

203

100

302 00 0092 / 5774

2143 N RICHMOND ST

1.0

0 01/16/02

01/16/02

203

100

300 06 0069 / 5233

1900 N SAWYER AVE

5.0

01/10/03

01/10/03

2,000 01/07/03

01/07/03

1,890

100

300 06 0069 / 5233

1900 N SPAULDING AVE

5.0

01/10/03

01/10/03

2,000 01/07/03

01/07/03

1,890

100

302 00 0092 / 5774

2700 N SPAULDING AVE

4.0

01/19/03

01/19/03

840 01/16/03

01/16/03

812

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 367

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

2852-2854 N SPAULDING AVE

1.0

205 10/05/01

10/05/01

205

100

300 06 0069 / 5233

2600-2699 N WHIPPLE ST

4.0

0 02/04/02

02/04/02

1,500

100

302 00 0092 / 5774

2868 W DICKENS AVE

1.0

0 01/16/02

01/16/02

203

100

302 00 0092 / 5774

3600-3640 W GEORGE ST

5.0

10/01/01

10/01/01

1,029 09/29/01

09/29/01

1,029

100

302 00 0092 / 5774

3000-3099 W LYNDALE ST

4.0

01/31/02

02/16/02

1,616 02/15/01

02/15/01

942

100

302 00 0092 / 5774

2868 W MC LEAN AVE

1.0

0 01/16/02

01/16/02

203

100

300 03 0030 / 4901

3800 W SCHUBERT AVE

4.0

1,500 10/18/04

10/20/04

917

100

300 06 0069 / 5233

3300-3399 W WRIGHTWOOD AVE

4.0

0 02/04/02

02/04/02

1,500

100

11/01/04

10/04/01

11/10/04

189.72

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

10/03/01

54,348

46,986

Fixtures

300 09 / 33101

ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD

6.0

08/25/08

09/10/08

2,600 09/09/08

09/10/08

1,992

100

300 06 0122 / 5275

ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE

.90

07/01/04

07/16/04

360 06/22/04

06/30/04

360

100

300 09 / 33101

ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE

3.0

09/08/08

09/09/08

1,200 09/08/08

09/09/08

996

100

300 06 0122 / 5275

ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE

18.0

10/10/03

10/15/03

9,000 10/20/03

10/30/03

7,830

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

27.90

13,160

11,178

2,654,346

1,896,672

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 368

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0766 / 6952

2959 N ALBANY AVE

1.0

09/18/96

09/18/96

0 09/18/96

09/18/96

300

100

805 06 1275 / 7461

2522 N CENTRAL PARK AVE

1.0

05/17/96

05/17/96

0 05/17/96

05/17/96

300

100

805 06 1732 / 7918

2618 N CENTRAL PARK AVE

1.0

06/02/97

06/02/97

0 06/02/97

06/02/97

300

100

302 00 0092 / 5774

3440 N CENTRAL PARK AVE

1.0

0 05/09/01

05/09/01

236

100

805 06 1161 / 7347

2937 N DAWSON AVE

1.0

03/23/95

03/23/95

0 03/23/95

03/23/95

300

100

805 06 0906 / 7092

2614 N FRANCISCO AVE

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

805 06 1456 / 7642

2953 N GRESHAM AVE

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 1078 / 7264

2415 N HAMLIN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1079 / 7265

2511 N HAMLIN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1052 / 7238

2525 N HAMLIN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1162 / 7348

2036 N KEDZIE AVE

1.0

03/23/95

03/23/95

0 03/23/95

03/23/95

300

100

302 00 0092 / 5774

2535 N KEDZIE AVE

27.0

0 01/25/01

01/07/02

6,363

100

805 06 2044 / 8230

2423 N KIMBALL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0322 / 6508

2544 N LAWNDALE AVE

1.0

06/18/96

06/18/96

0 06/18/96

06/18/96

300

100

805 06 0323 / 6509

2552 N LAWNDALE AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0325 / 6511

2602 N LAWNDALE AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0326 / 6512

2702 N LAWNDALE AVE

1.0

03/12/97

03/12/97

0 03/12/97

03/12/97

300

100

805 06 0327 / 6513

2730 N LAWNDALE AVE

1.0

03/12/97

03/12/97

0 03/12/97

03/12/97

300

100

805 06 1882 / 8068

2520 N MAPLEWOOD AVE

1.0

11/21/96

11/21/96

0 11/21/96

11/21/96

300

100

805 06 1869 / 8055

2601 N MILWAUKEE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1936 / 8122

2613 N MILWAUKEE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1937 / 8123

2625 N MILWAUKEE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1939 / 8125

2635 N MILWAUKEE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1940 / 8126

2641 N MILWAUKEE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1891 / 8077

2057 N MOZART ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0663 / 6849

2540 N RIDGEWAY AVE

1.0

03/12/97

03/12/97

0 03/12/97

03/12/97

300

100

805 06 0664 / 6850

2551 N RIDGEWAY AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0665 / 6851

2552 N RIDGEWAY AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0666 / 6852

2600 N RIDGEWAY AVE

1.0

06/13/96

06/13/96

0 06/13/96

06/13/96

300

100

805 06 0667 / 6853

2601 N RIDGEWAY AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 1675 / 7861

2610 N RIDGEWAY AVE

1.0

07/28/97

07/28/97

0 07/28/97

07/28/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 369

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1676 / 7862

2620 N RIDGEWAY AVE

1.0

07/28/97

07/28/97

0 07/28/97

07/28/97

300

100

805 06 0679 / 6865

2521 N SACRAMENTO AVE

1.0

10/08/96

10/08/96

0 10/08/96

10/08/96

300

100

805 06 0698 / 6884

2533 N SACRAMENTO AVE

1.0

04/17/96

04/17/96

0 04/17/96

04/17/96

300

100

805 06 0719 / 6905

2533 N SACRAMENTO AVE

1.0

10/08/96

10/08/96

0 10/08/96

10/08/96

300

100

300 06 0139 / 5289

2710 N SAWYER AVE

1,096.0

03/01/06

09/01/06

27,051 06/01/06

06/20/06

33,114

100

805 06 0638 / 6824

2715 N SAWYER AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

300

100

805 06 0639 / 6825

2747 N SAWYER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0640 / 6826

3022 N SAWYER AVE

1.0

02/10/95

02/10/95

0 02/10/95

02/10/95

300

100

805 06 1485 / 7671

2834 N SPAULDING AVE

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 0490 / 6676

1926 N WHIPPLE ST

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

805 06 0535 / 6721

1943 N WHIPPLE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0505 / 6691

1944 N WHIPPLE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1536 / 7722

2719 N WHIPPLE ST

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 1483 / 7669

2832 N WOODARD ST

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 0745 / 6931

3067 W ARMITAGE AVE

1.0

06/13/96

06/13/96

0 06/13/96

06/13/96

300

100

805 06 0734 / 6920

3501 W ARMITAGE AVE

1.0

04/30/96

04/30/96

0 04/30/96

04/30/96

300

100

805 06 0765 / 6951

3501 W ARMITAGE AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

300

100

805 06 0851 / 7037

3048 W BELDEN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1457 / 7643

3415 W DIVERSEY AVE

1.0

12/02/97

12/02/97

0 12/02/97

12/02/97

300

100

805 06 1035 / 7221

3535 W DIVERSEY AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

805 06 1016 / 7202

3557 W DIVERSEY AVE

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

805 06 0457 / 6643

2604 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 0491 / 6677

2612 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 0492 / 6678

2624 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 0493 / 6679

2632 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 0494 / 6680

2640 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 0478 / 6664

2652 W LOGAN BLVD

1.0

12/09/95

12/09/95

0 12/09/95

12/09/95

300

100

805 06 1803 / 7989

3214 W MC LEAN AVE

1.0

03/30/95

03/30/95

0 03/30/95

03/30/95

300

100

805 06 1836 / 8022

3219 W MC LEAN AVE

1.0

06/25/96

06/25/96

0 06/25/96

06/25/96

300

100

805 06 0616 / 6802

2713 W SCHUBERT AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0617 / 6803

2749 W SCHUBERT AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 370

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0439 / 6625

3541 W WOLFRAM ST

1.0

01/12/95

01/12/95

0 01/12/95

01/12/95

300

100

805 06 0468 / 6654

3760 W WRIGHTWOOD AVE

1.0

09/18/96

09/18/96

0 09/18/96

09/18/96

300

100

805 06 1657 / 7843

3767 W WRIGHTWOOD AVE

1.0

07/31/97

07/31/97

0 07/31/97

07/31/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

2710 N SAWYER AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

2535 N KEDZIE AVE

Work Type: Flood Light Install

1,186.0

27,051

58,313

Lamps 1,401.0

06/01/07

12/31/07

41,245 07/20/07

09/01/07

41,245

100

0 05/07/02

05/10/02

23,780

100

Installations 1,306.0

Fixtures

300 06 0198 / 5323

LAWNDALE GARDENS

20,563 05/29/01

05/30/01

12,106

100

300 06 0167 / 5306

N FRANCISCO AVE AND W WABANSIA AVE

2.50

0 06/01/99

06/01/99

539

100

300 06 0167 / 5306

W DIVERSEY AVE AND N AVERS AVE

3.50

0 06/10/99

06/10/99

1,229

100

302 00 0092 / 5774

2500 N LINDEN PL

1.0

0 08/13/01

08/13/01

345

100

302 00 0092 / 5774

2517 W LOGAN BLVD

1.0

0 02/14/01

02/14/01

471

100

302 00 0092 / 5774

2519 W LOGAN BLVD

1.0

0 02/14/01

02/14/01

471

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0282 / 5390

3326 W FULLERTON AVE

Work Type: Lighting Imprvmnts 300 06 0118 / 5272

2400 N CALIFORNIA AVE

03/08/01

05/22/01

9.0

20,563

15,161

Installations 1.0

2,800 09/20/04

09/23/04

2,349

100

77,376 09/11/00

06/05/01

77,431

100

Projects 1.0

10/30/00

06/29/01

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 371

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 09 / 33101

ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD

6.0

09/15/08

10/03/08

8,100 09/12/08

09/16/08

6,810

100

300 11 / 32222

ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST

11.55

11/01/07

12/01/07

15,725 03/13/08

04/04/08

13,060

100

300 11 / 32222

ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST

13.86

11/01/07

12/01/07

18,843 03/13/08

04/04/08

17,538

100

300 09 / 33101

ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE

3.0

09/10/08

09/19/08

4,050 09/10/08

09/19/08

3,375

100

300 06 0122 / 5275

ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE

18.0

10/15/03

10/18/03

24,000 10/20/03

10/30/03

18,269

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

2710 N SAWYER AVE

Work Type: Residntl Staggered Lighting

52.41

70,718

59,051

0

0

0

50

Lamps .0

03/01/08

12/01/08

Blocks

300 06 / 32146

ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

4.0

12/05/07

06/27/08

247,733 12/14/07

0

300 06 / 32146

ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

4.0

12/05/07

05/29/08

247,733 12/20/07

0

50

300 07 0035 / 5458

ON N DRAKE AVE FROM W SCHOOL ST TO N AVONDALE AVE

2.0

07/17/06

09/29/06

110,000 11/01/06

04/20/07

71,567

100

300 07 0035 / 5458

ON N MONTICELLO AVE FROM W SCHOOL ST TO W BELMONT AVE

3.0

08/07/06

10/06/06

255,000 09/11/06

11/17/06

162,122

100

300 07 0035 / 5458

ON N RICHMOND ST FROM W ARMITAGE AVE TO W BLOOMINGDALE AVE

2.0

05/11/06

07/17/06

140,000 05/11/06

07/24/06

127,515

100

300 06 0308 / 5414

Project has been completed. Note Last Updated on 25-AUG-06 ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE

2.0

03/16/06

12/31/06

147,540 05/11/06

07/24/06

127,565

100

300 07 0035 / 5458

ON N RIDGEWAY AVE FROM W BELDEN AVE TO W FULLERTON AVE

1.0

08/01/06

09/22/06

85,000 10/16/06

04/20/07

43,621

100

300 06 / 32146

ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE

1.0

12/05/07

05/29/08

300 07 0035 / 5458

ON W BELDEN AVE FROM N HAMLIN AVE TO N LAWNDALE AVE

1.0

08/01/06

09/22/06

300 07 0035 / 5458

ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE

300 07 0035 / 5458

ON W MELROSE ST FROM N KIMBALL AVE TO N DRAKE AVE

300 06 / 32277

ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT BLVD

Totals per Residntl Staggered Lighting

.0

03/01/06

12/31/06

2.0

07/17/06

09/29/06

.0

05/04/08

12/31/08

22.0

247,733

0

75

04/20/07

43,755

100

0

0

04/20/07

71,567

100

0

0

0

1,675,739

647,712

85,000 10/16/06 0 110,000 11/01/06

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 372

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Strt Lighting/Lamps 300 03 0001 / 4872

ON N FRANCISCO AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE

300 03 0035 / 4906

ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE

300 06 0232 / 5346

ON N LAWNDALE AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

2.0

10/28/02

12/28/02

150,000 10/28/02

12/20/02

128,918

100

300 06 0235 / 5349

ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

2.0

03/03/03

04/28/03

167,240 03/02/03

04/04/03

151,454

100

300 06 0267 / 5375

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

2.0

05/19/04

07/19/04

150,000 05/24/04

08/06/04

132,136

100

.50

06/01/04

09/01/04

40,000 05/29/04

07/09/04

40,000

100

06/01/04

09/01/04

40,000 05/24/04

07/09/04

40,000

100

6.50

547,240

492,508

Locations

302 00 0092 / 5774

2406 N LAWNDALE AVE

1.0

0 03/20/01

03/20/01

378

100

302 00 0092 / 5774

2412 N LAWNDALE AVE

1.0

0 03/20/01

03/20/01

378

100

302 00 0092 / 5774

2600 N MONTICELLO AVE

1.0

0 01/02/01

01/02/01

378

100

302 00 0092 / 5774

2436 N RIDGEWAY AVE

1.0

0 06/14/01

06/14/01

378

100

302 00 0092 / 5774

2448 N RIDGEWAY AVE

1.0

0 06/14/01

06/14/01

378

100

302 00 0092 / 5774

2454 N RIDGEWAY AVE

1.0

0 06/14/01

06/14/01

378

100

302 00 0092 / 5774

3608 W GEORGE ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3616 W GEORGE ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3626 W GEORGE ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3636 W GEORGE ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3640 W GEORGE ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3654 W GEORGE ST

1.0

0 03/28/01

03/28/01

378

100

302 00 0092 / 5774

2837 W MC LEAN AVE

1.0

0 03/20/01

03/20/01

378

100

302 00 0092 / 5774

2869 W MC LEAN AVE

1.0

0 03/20/01

03/20/01

378

100

302 00 0092 / 5774

3609 W WOLFRAM ST

1.0

0 02/09/01

02/09/01

378

100

302 00 0092 / 5774

3621 W WOLFRAM ST

1.0

0 02/09/01

02/09/01

378

100

Totals per Short Arm Installs - Residntl

16.0

0

6,048

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 373

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 04 0216 / 5114

ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE

15.50

05/01/06

11/01/06

2,920 05/17/06

10/30/06

2,920

100

300 09 / 33101

ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD

6.0

08/25/08

08/29/08

1,800 09/12/08

09/15/08

1,260

100

300 07 0035 / 5458

ON W BELMONT AVE FROM N SPAULDING AVE TO N KIMBALL AVE

3.0

04/18/06

11/18/06

845 10/02/06

10/20/06

0

100

300 07 0035 / 5458

ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE

.0

03/01/06

12/31/06

0

0

0

302 00 0076 / 5764

ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE

50.0

09/01/00

12/31/00

0

850

300 06 0108 / 5263

ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE

25.35

08/01/04

08/15/04

7,403 06/21/04

07/28/04

5,602

100

300 09 / 33101

ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N AVERS AVE

3.0

09/12/08

09/15/08

900 09/12/08

09/15/08

630

100

300 06 0108 / 5263

ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE

18.0

09/10/03

09/18/03

7,000 08/28/03

08/29/03

3,780

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting 300 06 0111 / 5266

ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE

303 00 0006 / 5783

2400 N MILWAUKEE AVE

20,868

Work Type: Traffic Signal Regrouping 2710 N SAWYER AVE

15,042

Blocks 3.48

08/01/00

09/30/00

0 11/01/98

12/15/98

36,834

100

08/01/97

12/01/97

60,000 08/01/97

04/30/98

76,547

100

3.48

Totals per Strt Lighting

300 06 0139 / 5289

120.85

60,000

113,381

Lamps 2,273.0

03/01/04

12/01/04

11,819 10/19/06

10/27/06

24,753

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 374

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

302 00 0072 / 5760

2830 N CALIFORNIA AVE

1.0

0 08/31/99

09/28/99

39,560

100

805 06 2793 / 8979

1799 N FRANCISCO AVE

6.0

04/13/94

04/13/94

0 04/13/94

04/13/94

4,500

100

805 06 2429 / 8615

3198 N KEDZIE AVE

12.0

01/02/96

01/02/96

0 01/02/96

01/02/96

9,000

100

302 00 0072 / 5760

3200 N KEDZIE AVE

1.0

0 09/27/99

10/22/99

24,706

100

300 06 0217 / 5337

2535 N KEDZIE BLVD

559.0

31,420 05/17/04

05/21/04

21,780

100

302 00 0072 / 5760

3200 N KIMBALL AVE

1.0

0 08/31/99

09/15/99

24,773

100

805 06 2437 / 8623

3338 N KIMBALL AVE

12.0

12/19/95

12/19/95

0 12/19/95

12/19/95

9,000

100

805 06 2399 / 8585

1798 N MOZART ST

10.0

10/16/95

10/16/95

0 10/16/95

10/16/95

7,500

100

805 06 2229 / 8415

3001 N SACRAMENTO AVE

8.0

10/29/96

10/29/96

0 10/29/96

10/29/96

6,000

100

302 00 0071 / 5759

2530 N WESTERN AVE

0 02/07/98

02/17/98

32,008

100

805 06 2683 / 8869

3653 W ADDISON ST

8.0

0 04/16/92

04/16/92

6,000

100

302 00 0072 / 5760

3210 W BELMONT AVE

1.0

0 09/16/99

09/24/99

14,025

100

302 00 0072 / 5760

3220 W BELMONT AVE

1.0

0 09/16/99

10/16/99

12,670

100

805 06 2794 / 8980

2929 W BLOOMINGDALE AVE

5.0

0 06/01/94

06/01/94

3,750

100

302 00 0072 / 5760

2800 W DIVERSEY AVE

1.0

0 08/02/99

09/03/99

46,462

100

Totals per Underpass Lighting

626.0

05/04/04

04/16/92

06/01/94

05/10/04

04/16/92

06/01/94

31,420

261,734

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 375

1/1/2008 AND 12/31/2008

Ward 35 Rey Colon CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 0073 / 4337

3400 W DIVERSEY AVE

Work Type: New Signal

Locations 1.0

06/01/03

07/01/03

ON W DICKENS AVE FROM N CALIFORNIA AVE TO N MOZART ST

1.0

09/01/04

09/30/04

210 06 0208 / 4451

W ADDISON ST AND N LAWNDALE AVE

.50

12/01/05

06/30/06

210 06 0131 / 4390

W FULLERTON AVE AND N AVERS AVE

.50

07/01/01

12/01/01

2.0

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N KIMBALL AVE AND W ARMITAGE AVE

Work Type: Signals 300 06 0096 / 5258

2724 N KEDZIE BLVD

Work Type: TSM Install

0

Locations

300 06 0283 / 5391

Totals per New Signal

50,000

11,807 09/09/04

09/09/04

112,500 85,000 05/31/01

11,807

100

0 08/02/01

209,307

47,668

100

59,475

Crossings .50

2,000 10/02/01

10/02/01

178

100

Intersections 32.0

11/01/03

11/01/03

0 11/01/03

11/07/03

5,060

100

Locations

210 06 0074 / 4338

N ROCKWELL ST AND W LOGAN BLVD

1.0

10/01/03

12/01/03

328,600 10/15/03

02/04/04

117,249

100

814 06 0273 / 16485

2800 N CALIFORNIA AVE

1.0

03/17/92

03/17/92

0 03/17/92

03/17/92

80,424

100

814 06 0120 / 16335

2812 N CALIFORNIA AVE

1.0

10/13/93

10/13/93

0 10/13/93

10/13/93

78,827

100

814 06 0108 / 16323

3600 N CENTRAL PARK AVE

1.0

10/26/94

10/26/94

0 10/26/94

10/26/94

83,419

100

814 06 0396 / 16583

3000 N KEDZIE AVE

1.0

04/19/91

04/19/91

0 04/19/91

04/19/91

96,382

100

814 06 0119 / 16334

3125 N KEDZIE AVE

1.0

10/27/92

10/27/92

0 10/27/92

10/27/92

78,827

100

814 06 0303 / 16515

3600 N KIMBALL AVE

1.0

02/20/90

02/20/90

0 02/20/90

02/20/90

44,226

100

814 06 0286 / 16498

3736 N KIMBALL AVE

1.0

11/20/91

11/20/91

0 11/20/91

11/20/91

123,207

100

814 06 0057 / 16273

2800 N SACRAMENTO AVE

1.0

04/16/91

04/16/91

0 04/16/91

04/16/91

96,382

100

814 06 0269 / 16481

3000 N SACRAMENTO AVE

1.0

12/23/91

12/23/91

0 12/23/91

12/23/91

35,000

100

814 06 0102 / 16317

3600 N ST LOUIS AVE

1.0

08/01/94

08/01/94

0 08/01/94

08/01/94

163,461

100

814 06 0124 / 16338

3648 W ADDISON ST

1.0

10/26/94

10/26/94

0 10/26/94

10/26/94

79,020

100

12.0

328,600

1,076,424

589,907

1,141,137

Totals per Construction Phase

3,244,253

3,037,808

Totals for Ward 35

3,250,953

3,045,062

Totals per TSM Install Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 376

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32146

ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE

300 06 0308 / 5414

ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE

300 06 0282 / 5390 300 06 0292 / 5399

Projects 1.0

05/01/07

10/31/07

3,900 05/29/07

06/28/07

5,465

100

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,419

100

1713 N HARLEM AVE

1.0

08/19/04

08/26/04

1,000 08/19/04

08/26/04

1,000

100

6450 W BELMONT AVE

1.0

02/08/05

03/01/05

800 01/03/05

04/15/05

747

100

Totals per Design/Engineering

3.0

5,700

9,631

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 377

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 09 / 33102

ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE

Work Type: Alley Lighting/Lamps

Fixtures 14.0

06/09/08

06/13/08

5,600 06/09/08

06/13/08

3,025

100

Installations

805 06 1701 / 7887

3657 N CUMBERLAND AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1083 / 7269

1921 N HARLEM AVE

1.0

09/12/96

09/12/96

0 09/12/96

09/12/96

300

100

805 06 1877 / 8063

2838 N NATCHEZ AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1931 / 8117

3600 N NEVA AVE

1.0

12/12/96

12/12/96

0 12/12/96

12/12/96

300

100

805 06 1932 / 8118

3620 N NEVA AVE

1.0

12/12/96

12/12/96

0 12/12/96

12/12/96

300

100

805 06 1907 / 8093

3356 N NEWLAND AVE

1.0

08/12/96

08/12/96

0 08/12/96

08/12/96

300

100

805 06 1910 / 8096

2436 N NORMANDY AVE

1.0

09/27/96

09/27/96

0 09/27/96

09/27/96

300

100

805 06 0600 / 6786

3918 N OCTAVIA AVE

1.0

07/16/96

07/16/96

0 07/16/96

07/16/96

300

100

805 06 0576 / 6762

3617 N OLEANDER AVE

1.0

11/13/96

11/13/96

0 11/13/96

11/13/96

300

100

805 06 1727 / 7913

3433 N PANAMA AVE

1.0

05/28/97

05/28/97

0 05/28/97

05/28/97

300

100

300 06 0139 / 5289

6839 W BELMONT AVE

1,977.0

03/01/06

09/01/06

45,478 05/17/06

06/02/06

59,733

100

302 00 0092 / 5774

6839 W BELMONT AVE

2.0

0 07/12/01

10/03/01

471

100

805 06 0978 / 7164

6939 W DIVERSEY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0944 / 7130

7451 W FOREST PRESERVE AVE

1.0

06/28/96

06/28/96

0 06/28/96

06/28/96

300

100

805 06 1123 / 7309

7151 W GRAND AVE

1.0

12/20/96

12/20/96

0 12/20/96

12/20/96

300

100

805 06 1124 / 7310

7159 W GRAND AVE

1.0

12/20/96

12/20/96

0 12/20/96

12/20/96

300

100

805 06 1108 / 7294

7019 W HENDERSON ST

1.0

05/03/96

05/03/96

0 05/03/96

05/03/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

6839 W BELMONT AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

6839 W BELMONT AVE

Work Type: Flood Light Install

1,994.0

45,478

64,704

Lamps 1,783.0

06/01/07

12/31/07

52,491 08/20/07

09/15/07

52,491

100

0 05/08/02

05/11/02

31,190

100

Installations 1,713.0

Fixtures

302 00 0092 / 5774

2524 N SAYRE AVE

1.0

0 03/20/01

03/20/01

471

100

302 00 0092 / 5774

2558 N SAYRE AVE

1.0

0 03/20/01

03/20/01

471

100

2.0

0

Totals per Flood Light Install

942

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 378

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0292 / 5399

Installations

6450 W BELMONT AVE

.0

03/01/05

12/31/05

6,097 09/27/05

10/04/05

4,593

100

10/06/04

10/31/04

0 09/14/04

09/21/04

13,453

100

08/04/08

08/15/08

12,150 08/04/08

08/15/08

10,242

100

03/01/08

12/01/08

0

0

0

263,000

Operations project Note Last Updated on 01-NOV-07

Projects

Work Type: Lighting Imprvmnts 300 06 0282 / 5390

1713 N HARLEM AVE

.0

Fixtures

Work Type: Ornamental - Piggyback Lighting 300 09 / 33102

ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE

9.0

Lamps

Work Type: Residential Regrouping 300 06 0270 / 5378

6839 W BELMONT AVE

.0

Blocks

Work Type: Residntl Staggered Lighting 300 06 / 32146

ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE

4.0

07/15/07

03/15/08

0

95

300 06 0298 / 5405

ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE

2.0

05/15/05

06/30/05

0 05/02/05

06/10/05

119,717

100

300 06 0308 / 5414

ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE

2.0

04/18/06

06/02/06

179,830 05/30/06

07/28/06

121,255

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0122 / 5275

ON N NATCHEZ AVE FROM W BELDEN AVE TO W GRAND AVE

Work Type: Strt Light Pole Painting 300 04 0216 / 5114 300 09 / 33102

ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY AVE ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE

302 00 0076 / 5764

ON W NORTH AVE FROM N NAGLE AVE TO N NASHVILLE AVE

Totals per Strt Light Pole Painting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

6839 W BELMONT AVE

Totals per Lighting/Electrical

8.0

442,830

240,972

Blocks 1.50

07/01/03

09/01/03

110,000 06/30/03

10/07/03

110,000

100

15.50

05/01/06

11/01/06

3,353 05/17/06

11/01/06

3,353

100

9.0

06/09/08

06/13/08

2,700 06/09/08

06/13/08

1,800

100

11.0

04/27/98

04/27/98

0 04/27/98

04/27/98

187

100

Locations

35.50

6,053

5,340

Lamps 1,139.0

03/01/04

12/01/04

5,922 10/17/06 686,621

10/19/06

12,404 549,356

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 379

1/1/2008 AND 12/31/2008

Ward 36 William J.P. Banks CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

300 06 0225 / 5340

1800 N NARRAGANSETT AVE

1.0

10/01/03

11/01/03

3,153 08/05/03

01/08/04

4,601

100

300 06 0225 / 5340

6400 W BLOOMINGDALE AVE

1.0

10/01/03

11/01/03

3,154 08/05/03

01/08/04

4,602

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

2.0

6,307

9,203

Locations

300 05 0036 / 5151

W ADDISON ST AND N HARLEM AVE

1.0

115,200 04/07/06

103,282

100

300 05 0036 / 5151

W ADDISON ST AND N OAK PARK AVE

.50

40,250 04/06/06

33,535

100

300 05 0036 / 5151

W BELMONT AVE AND N HARLEM AVE

1.0

98,300 02/20/06

106,761

100

Totals per Left Turn Arrow

Work Type: Signals 300 06 0096 / 5258

6839 W BELMONT AVE

Work Type: TSM Install

2.50

31.0

10/27/03

11/04/03

07/12/95

07/12/95

1.0

300 11 / 32225

6650 W DIVERSEY AVE

1.0

814 06 0069 / 16285

6700 W GRAND AVE

1.0

ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE

Totals per Traffic

10/17/03

4,902

100

0 07/12/95

07/12/95

127,326

100

7,000 09/16/94

09/16/94

3.0

Work Type: Traffic Equipment Painting

0 10/08/03

Locations

2100 N NARRAGANSETT AVE

Totals per TSM Install

243,578

Intersections

814 06 0059 / 16275

300 09 / 33102

253,750

0 09/16/94

09/16/94

7,000

0

0

101,159

100

228,485

Locations 2.0

06/09/08

06/13/08

2,900 06/09/08

06/13/08

1,230

269,957

487,398

Totals per Construction Phase

956,578

1,036,754

Totals for Ward 36

962,278

1,046,385

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 380

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0303 / 5409

ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE

.0

09/01/05

11/01/05

0 06/21/05

04/20/06

1,120

100

300 06 0308 / 5414

ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

354

100

300 06 / 32277

ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE

4.0

04/01/08

08/30/08

260,000 04/29/08

210 06 0127 / 4386

N CICERO AVE AND W DIVISION ST

1.0

12/15/05

03/15/06

0 12/15/05

210 06 / 32040

W DIVISION ST AND N LARAMIE AVE

.0

11/01/06

12/31/07

5,000

3,186

0

300 06 0292 / 5399

W NORTH AVE AND N KOSTNER AVE

1.0

04/01/05

04/25/05

5,000 02/03/05

02/15/05

5,000

100

300 06 0292 / 5399

4300 W DIVISION ST

1.0

01/22/05

02/04/05

1,000 01/03/05

02/10/05

742

100

Totals per Design/Engineering

7.0

271,000

02/14/06

0

70

470

100

10,872

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 381

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON N KARLOV AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

300 06 0069 / 5233

ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

8.0

06/16/02

06/16/02

1,680 06/13/02

06/13/02

1,680

100

16.0

05/02/02

05/02/02

3,600 04/30/02

04/30/02

2,734

300 09 / 33103

ON N LATROBE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

100

7.0

11/20/08

11/20/08

2,800 11/20/08

11/20/08

1,280

300 03 0037 / 4908

ON N LATROBE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

100

12.0

10/15/04

10/21/04

4,600 10/06/04

10/09/04

2,676

302 00 0092 / 5774

ON N LAVERGNE AVE FROM W CHICAGO AVE TO W IOWA ST

3.0

100

0 02/01/02

02/06/02

618

300 07 0037 / 5460

ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD

5.0

100

2,200 01/10/07

01/31/07

2,200

100

302 00 0092 / 5774

10620105 was found that work was don previously under work order at an earlier date. iris is being updated Note Last Updated on 25-FEB-08 ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD 3.0 0 02/01/02

02/06/02

618

100

302 00 0092 / 5774

ON N LECLAIRE AVE FROM W CHICAGO AVE TO W IOWA ST

3.0

0 02/01/02

02/06/02

618

100

300 07 0037 / 5460

ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST

5.0

2,200 04/18/06

11/18/06

2,200

100

302 00 0092 / 5774

ON N LECLAIRE AVE FROM W IOWA ST TO W AUGUSTA BLVD

3.0

0 02/01/02

02/06/02

618

100

300 06 0069 / 5233

ON N LECLAIRE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

10.0

04/20/02

04/20/02

2,100 04/17/02

04/17/02

2,030

100

300 03 0037 / 4908

ON N LINDER AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

12.0

10/15/04

10/21/04

4,600 10/06/04

10/09/04

2,676

100

300 07 0037 / 5460

ON N LINDER AVE FROM W WABANSIA AVE TO W BLOOMINGDALE AVE

5.0

01/10/07

01/31/07

2,200 08/07/06

08/07/06

2,000

100

300 09 / 33103

ON N LOCKWOOD AVE FROM W GRAND AVE TO W FULLERTON AVE

11.0

10/22/08

10/22/08

4,400 10/22/08

10/22/08

2,869

100

300 03 0037 / 4908

ON N LOCKWOOD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

12.0

10/15/04

10/21/04

4,600 10/06/04

10/09/04

2,676

100

300 06 0122 / 5275

ON N LONG AVE FROM W DIVISION ST TO W POTOMAC AVE

5.0

11/20/03

11/21/03

2,075 11/05/03

11/05/03

1,575

100

300 03 0037 / 4908

ON N LONG AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

10.0

10/15/04

10/21/04

3,850 10/06/04

10/09/04

2,230

100

300 03 0037 / 4908

ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

10.0

10/15/04

10/21/04

3,850 10/06/04

10/09/04

2,230

100

300 06 0122 / 5275

ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE

10.0

07/20/03

07/21/03

4,150 06/17/03

06/17/03

2,599

100

300 03 0037 / 4908

ON N LOTUS AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

10.0

10/15/04

10/21/04

3,850 10/06/04

10/09/04

2,230

100

300 03 0037 / 4908

ON N LUNA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

7.0

10/15/04

10/21/04

2,625 10/06/04

10/09/04

1,561

100

300 07 0030 / 5453

ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE

16.0

04/18/06

11/18/06

6,600

300 06 0069 / 5233

ON N PINE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

3.0

300 06 0069 / 5233

ON W AUGUSTA BLVD FROM N LONG AVE TO N CENTRAL AVE

300 06 0069 / 5233

ON W BLOOMINGDALE AVE FROM N CICERO AVE TO N LECLAIRE AVE

300 07 0037 / 5460

ON W CORTEZ ST FROM N LONG AVE TO N PINE AVE

5.0

01/10/07

300 07 0037 / 5460

ON W CRYSTAL ST FROM N PINE AVE TO N CENTRAL AVE

4.0

300 09 / 33103

ON W IOWA ST FROM N KOSTNER AVE TO N KILBOURN AVE

300 06 0122 / 5275 300 11 / 32226

01/10/07

04/18/06

01/31/07

11/18/06

0

0

0 04/25/02

04/25/02

1,125

100

10.0

0 04/25/02

04/25/02

3,750

100

17.0

5,825 04/15/02

04/17/02

6,375

100

01/31/07

2,100 01/10/07

01/31/07

2,100

100

01/10/07

01/31/07

1,700 01/10/07

01/31/07

1,700

100

5.0

08/25/08

08/25/08

2,000 08/25/08

08/25/08

1,250

100

ON W KAMERLING AVE FROM N LONG AVE TO N PINE AVE

5.0

10/15/03

10/16/03

2,075 11/05/03

11/05/03

1,575

100

ON W ST PAUL AVE FROM N CICERO AVE TO N LAMON AVE

5.0

08/01/07

08/10/07

2,200 08/18/07

08/18/07

1,226

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 382

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0069 / 5233

ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE

17.0

5,825 04/15/02

04/17/02

6,375

100

300 06 0069 / 5233

ON W WABANSIA AVE FROM N CICERO AVE TO N LECLAIRE AVE

17.0

5,825 04/15/02

04/17/02

6,375

100

300 06 0069 / 5233

ON W WALTON ST FROM N LONG AVE TO N CENTRAL AVE

3.0

0 04/25/02

04/25/02

1,125

100

300 07 0037 / 5460

1100 N LATROBE AVE

5.0

04/18/06

11/18/06

2,200 01/05/07

01/05/07

0

100

300 06 0122 / 5275

1500 N LATROBE AVE

4.0

11/01/03

11/02/03

1,700 11/05/03

11/05/03

1,242

100

300 06 0069 / 5233

819 N LEAMINGTON AVE

3.0

12/15/03

12/15/03

1,125 02/10/04

02/10/04

581

100

300 06 0122 / 5275

1400 N LEAMINGTON AVE

11.0

05/10/03

05/12/03

4,900 05/01/03

05/01/03

3,122

100

300 11 / 32226

1600 N LINDER AVE

4.0

10/10/07

10/10/07

1,800 10/10/07

10/10/07

1,800

100

300 11 / 32226

1600-1700 N LINDER AVE

5.0

10/10/07

10/10/07

2,200 10/10/07

10/10/07

2,200

100

300 06 0069 / 5233

1800 N LINDER AVE

5.0

05/01/03

05/01/03

2,000 09/25/02

09/25/02

1,342

100

300 06 0069 / 5233

1800 N LONG AVE

5.0

09/28/02

09/28/02

2,000 09/25/02

09/25/02

1,342

100

302 00 0092 / 5774

2200 N LONG AVE

5.0

10/02/01

10/02/01

1,029 10/02/01

10/02/01

1,029

100

300 06 0069 / 5233

2340 N LOREL AVE

1.0

06/09/02

06/09/02

210 06/06/02

06/06/02

203

100

300 06 0069 / 5233

2350 N LOREL AVE

1.0

06/09/02

06/09/02

210 06/06/02

06/06/02

203

100

300 06 0069 / 5233

1800 N LOTUS AVE

5.0

09/28/02

09/28/02

2,000 09/25/02

09/25/02

1,342

100

302 00 0092 / 5774

4800-4899 W AUGUSTA BLVD

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4900-4999 W AUGUSTA BLVD

4.0

0 02/01/02

02/06/02

824

100

300 03 0037 / 4908

4300 W CORTEZ ST

5.0

2,075 05/14/04

05/14/04

1,167

100

302 00 0092 / 5774

4800-4899 W CORTEZ ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4900-4999 W CORTEZ ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4800-4899 W IOWA ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4900-4999 W IOWA ST

4.0

0 02/01/02

02/06/02

824

100

300 06 0069 / 5233

5500-5599 W IOWA ST

1.0

0 04/25/02

04/25/02

375

100

302 00 0092 / 5774

4800-4899 W RICE ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4900-4999 W RICE ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4800-4899 W THOMAS ST

3.0

0 02/01/02

02/06/02

618

100

302 00 0092 / 5774

4900-4999 W THOMAS ST

3.0

0 02/01/02

02/06/02

618

100

302 00 0092 / 5774

4800-4899 W WALTON ST

4.0

0 02/01/02

02/06/02

824

100

302 00 0092 / 5774

4900-4999 W WALTON ST

4.0

0 02/01/02

02/06/02

824

100

Totals per 250 Watt Changeout

380.0

05/20/04

05/21/04

112,979

98,318

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 383

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

38.50

04/04/05

11/18/05

15,400 07/10/05

08/01/05

13,475

100

300 03 0031 / 4902

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

91.50

05/18/04

05/25/04

36,600 05/15/04

06/01/04

34,037

100

300 07 0037 / 5460

ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE

97.0

04/18/06

11/18/06

38,800 12/04/06

01/22/07

38,800

100

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

227.0

90,800

86,312

Installations

300 06 0122 / 5275

ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE

7.0

07/20/03

07/21/03

2,450 06/17/03

06/17/03

2,598

100

805 06 1146 / 7332

835 N KEELER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0345 / 6531

1141 N LARAMIE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2053 / 8239

2310 N LARAMIE AVE

1.0

01/11/96

01/11/96

0 01/11/96

01/11/96

300

100

805 06 0319 / 6505

1000 N LAWLER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0340 / 6526

1034 N LAWLER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0321 / 6507

1437 N LAWLER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0356 / 6542

1810 N LECLAIRE AVE

1.0

07/30/86

07/30/86

0 07/30/86

07/30/86

300

100

805 06 1753 / 7939

1746 N LINDER AVE

1.0

05/23/97

05/23/97

0 05/23/97

05/23/97

300

100

805 06 0338 / 6524

1534 N LONG AVE

1.0

06/19/96

06/19/96

0 06/19/96

06/19/96

300

100

805 06 1874 / 8060

1400 N LOREL AVE

1.0

05/30/96

05/30/96

0 05/30/96

05/30/96

300

100

805 06 1875 / 8061

1418 N LOREL AVE

1.0

05/06/96

05/06/96

0 05/06/96

05/06/96

300

100

805 06 1938 / 8124

4030 W CHICAGO AVE

1.0

03/14/97

03/14/97

0 03/14/97

03/14/97

300

100

805 06 1668 / 7854

4040 W CHICAGO AVE

1.0

07/17/97

07/17/97

0 07/17/97

07/17/97

300

100

805 06 1949 / 8135

4042 W CHICAGO AVE

1.0

01/31/97

01/31/97

0 01/31/97

01/31/97

300

100

805 06 0342 / 6528

4557 W NORTH AVE

1.0

10/06/95

10/06/95

0 10/06/95

10/06/95

300

100

300 06 0139 / 5289

5344 W NORTH AVE

1,233.0

03/01/06

09/01/06

30,017 06/01/06

06/19/06

37,254

100

302 00 0092 / 5774

5344 W NORTH AVE

28.0

0 01/09/01

01/13/02

6,598

100

805 06 0682 / 6868

5513 W NORTH AVE

1.0

03/28/95

03/28/95

0 03/28/95

03/28/95

300

100

805 06 1652 / 7838

5321 W POTOMAC AVE

1.0

07/29/97

07/29/97

0 07/29/97

07/29/97

300

100

805 06 1653 / 7839

5345 W POTOMAC AVE

1.0

07/29/97

07/29/97

0 07/29/97

07/29/97

300

100

805 06 0497 / 6683

4300 W WALTON ST

1.0

05/30/96

05/30/96

0 05/30/96

05/30/96

300

100

Totals per Alley Lighting/Lamps Totals per Lighting/Electrical

1,287.0

32,467

52,150

3,373,630

2,698,872

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 384

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

5344 W NORTH AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5344 W NORTH AVE

Work Type: Flood Light Install 302 00 0092 / 5774

5443 W HURON ST

Work Type: Lighting Imprvmnts 300 06 0303 / 5409

ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE

300 06 0292 / 5399

4300 W DIVISION ST

Lamps 1,378.0

06/01/07

12/31/07

40,568 06/05/07

09/10/07

40,568

100

0 06/15/02

06/18/02

22,451

100

0 03/28/01

03/28/01

471

100

Installations 1,233.0

Fixtures 1.0

Installations 1.0

10/01/05

09/26/06

147,000 08/12/05

10/29/05

22,425

100

.0

03/01/05

12/31/05

0 03/01/05

12/31/05

0

0

Operations project Note Last Updated on 01-NOV-07 Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

1.0

147,000

22,425

Fixtures

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

31.0

04/04/05

11/18/05

41,850 07/10/05

07/15/05

26,500

100

300 03 0031 / 4902

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

77.0

05/26/04

06/10/04

103,950 05/25/04

07/07/04

81,642

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

5344 W NORTH AVE

108.0

145,800

108,142

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 385

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0037 / 5460

ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

04/18/06

11/18/06

170,000 03/19/07

05/31/07

96,542

100

300 05 0037 / 5152

ON N LATROBE AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

04/04/05

11/18/05

170,000 09/07/05

11/18/05

126,305

100

300 09 / 33103

ON N LAVERGNE AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

130,000 04/01/08

12/01/08

0

0

300 06 0308 / 5414

ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE

1.0

08/25/06

10/25/06

84,842 09/05/06

04/27/07

20,179

100

300 11 / 32226

ON N LECLAIRE AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

11/30/07

03/14/08

120,000 11/28/07

05/02/08

107,104

100

300 05 0037 / 5152

ON N LINDER AVE FROM W HIRSCH ST TO W NORTH AVE

2.0

04/04/05

11/18/05

170,000 09/01/05

11/18/05

111,574

100

300 09 / 33094

ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST

1.0

300 03 0037 / 4908

ON N LOCKWOOD AVE FROM W HIRSCH ST TO W LE MOYNE ST

2.0

300 09 / 33103

ON N LONG AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

2.0

300 11 / 32226

ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE

300 06 0298 / 5405 300 05 0037 / 5152 300 06 / 32277

ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE

300 05 0037 / 5152 300 11 / 32226

65,000 03/15/05

05/15/05

2.0

11/30/07

03/14/08

ON N PINE AVE FROM W OHIO ST TO W CHICAGO AVE

2.0

07/15/05

ON N PINE AVE FROM W OHIO ST TO W RACE AVE

2.0

04/04/05

.0

05/04/08

12/31/08

ON W CRYSTAL ST FROM N LONG AVE TO N CENTRAL AVE

2.0

04/04/05

11/18/05

170,000 09/19/05

ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE

2.0

11/30/07

03/14/08

120,000 11/28/07

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0

0

118,337

100

165,000 03/14/05

06/10/05

130,000 04/01/08

12/01/08

0

0

120,000 11/28/07

05/02/08

107,104

100

09/15/05

0 08/15/05

10/14/05

128,727

100

11/18/05

85,000 08/15/05

10/14/05

91,671

100

26.0

0

0

0

11/11/05

124,547

100

05/02/08

107,104

100

1,699,842

1,139,194

Blocks

300 06 0252 / 5362

MC NAIR ACADEMIC CPS

2.0

08/01/03

08/29/03

79,580 07/10/03

09/02/03

87,933

100

300 06 0122 / 5275

ON N LAVERGNE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD

3.0

07/11/03

09/11/03

186,500 07/11/03

10/01/03

182,566

100

300 06 0232 / 5346

ON W CORTEZ ST FROM N CICERO AVE TO N LAVERGNE AVE

2.0

12/16/02

02/16/03

174,000 12/12/02

02/14/03

116,740

100

300 06 0267 / 5375

ON W IOWA ST FROM N CICERO AVE TO N LAMON AVE

2.0

05/18/04

07/18/04

147,333 05/03/04

09/16/04

148,699

100

300 03 0037 / 4908

ON W POTOMAC AVE FROM N CICERO AVE TO N LAVERGNE AVE

2.0

09/15/04

11/15/04

150,000 08/02/04

09/09/04

108,138

100

300 03 0037 / 4908

ON W POTOMAC AVE FROM N LONG AVE TO N CENTRAL AVE

2.0

10/15/04

12/15/04

150,000 11/18/04

03/18/05

101,249

100

300 06 0235 / 5349

ON W RICE ST FROM N CICERO AVE TO N LAVERGNE AVE

2.0

07/15/03

09/15/03

144,029 06/06/03

09/18/03

176,128

100

Totals per Residntl Strt Lighting/Lamps

15.0

1,031,442

921,453

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 386

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

1600 N LOCKWOOD AVE

1.0

0 04/12/01

04/12/01

378

100

302 00 0092 / 5774

800 N PINE AVE

1.0

0 04/12/01

04/12/01

378

100

302 00 0092 / 5774

5514 W CORTLAND ST

1.0

0 01/17/01

01/17/01

378

100

302 00 0092 / 5774

5547 W CORTLAND ST

1.0

0 01/17/01

01/17/01

378

100

4.0

0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

1,512

Locations

302 00 0076 / 5764

ON N LARAMIE AVE FROM W HIRSCH ST TO W LE MOYNE ST

14.0

09/01/00

12/31/00

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

31.0

04/04/05

11/18/05

302 00 0076 / 5764

ON N LAVERGNE AVE FROM W HIRSCH ST TO W LE MOYNE ST

9.0

09/01/00

12/31/00

0

153

302 00 0076 / 5764

ON N LAWLER AVE FROM W HIRSCH ST TO W LE MOYNE ST

9.0

09/01/00

12/31/00

0

153

302 00 0076 / 5764

ON N LEAMINGTON AVE FROM W HIRSCH ST TO W LE MOYNE ST

9.0

09/01/00

12/31/00

0

153

302 00 0076 / 5764

ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST

9.0

09/01/00

12/31/00

0

153

300 09 / 33096

ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST

3.50

302 00 0076 / 5764

ON N PINE AVE FROM W DIVISION ST TO W POTOMAC AVE

300 03 0031 / 4902 302 00 0076 / 5764 300 07 0037 / 5460 302 00 0076 / 5764

0 7,750 06/27/05

238 07/15/05

700

6,324

100

0

0

5.0

07/20/98

07/20/98

0 07/20/98

07/20/98

85

100

ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD

101.0

05/10/04

06/04/04

27,425 05/10/04

06/04/04

24,084

100

ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE

61.50

09/01/00

12/31/00

ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE

87.0

04/18/06

11/18/06

ON W NORTH AVE FROM N CICERO AVE TO N CENTRAL AVE

96.0

09/01/00

12/31/00

300 04 0216 / 5114

ON W NORTH AVE FROM N KILPATRICK AVE TO N CICERO AVE

22.0

05/01/06

11/01/06

302 00 0076 / 5764

ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE

4.05

09/01/00

12/31/00

302 00 0077 / 5765

737 N CENTRAL AVE

0 06/22/99

06/22/99

786

100

302 00 0076 / 5764

5300-5400 W CRYSTAL ST

11.0

07/20/98

07/20/98

0 07/20/98

07/20/98

187

100

302 00 0076 / 5764

5300-5400 W DIVISION ST

17.0

09/01/00

12/31/00

0

289

302 00 0076 / 5764

5100 W HIRSCH ST

9.0

09/01/00

12/31/00

0

153

302 00 0076 / 5764

5000-5100 W LE MOYNE ST

9.0

09/01/00

12/31/00

0

153

302 00 0076 / 5764

5000-5100 W NORTH AVE

24.0

09/01/00

12/31/00

0

408

302 00 0076 / 5764

5300-5400 W POTOMAC AVE

10.0

09/01/00

12/31/00

0

170

62,383

63,004

Totals per Strt Light Pole Painting

9.0

550.05

0 21,750 12/22/06

1,046 01/22/07

0 4,758 05/17/06

22,011

100

1,632 07/24/06

0

4,758

100

69

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 387

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping

Lamps

5344 W NORTH AVE

1,647.0

Work Type: Underpass Lighting

Fixtures

805 06 2112 / 8298

1813 N CICERO AVE

805 06 2463 / 8649

1930 N LARAMIE AVE

805 06 2663 / 8849

300 06 0238 / 5352

06/01/06

12/31/06

9,000 10/13/06

10/19/06

8,564

100

10.0

08/01/94

08/01/94

0 08/01/94

24.0

08/21/95

08/21/95

0 08/21/95

08/01/94

7,500

100

08/21/95

18,000

1895 N LECLAIRE AVE

10.0

12/14/94

12/14/94

100

0 12/14/94

12/14/94

7,500

805 06 2438 / 8624

1035 S KILDARE AVE

14.0

08/01/95

100

08/01/95

0 08/01/95

08/01/95

10,500

805 06 2319 / 8505

4601 W AUGUSTA BLVD

22.0

100

05/30/96

05/30/96

0 05/30/96

05/30/96

16,500

805 06 2287 / 8473

4533 W DIVISION ST

100

30.0

08/16/96

08/16/96

0 08/16/96

08/16/96

22,500

805 06 2288 / 8474

100

4533 W DIVISION ST

16.0

08/16/96

08/16/96

0 08/16/96

08/16/96

12,000

100

805 06 2256 / 8442

4601 W GRAND AVE

14.0

10/23/96

10/23/96

0 10/23/96

10/23/96

10,500

100

805 06 2822 / 9008

5600 W GRAND AVE

13.0

06/01/93

06/01/93

0 06/01/93

06/01/93

9,750

100

805 06 2376 / 8562

4575 W NORTH AVE

11.0

11/14/95

11/14/95

0 11/14/95

11/14/95

8,250

100

805 06 2377 / 8563

4575 W NORTH AVE

12.0

11/20/95

11/20/95

0 11/20/95

11/20/95

9,000

100

300 06 0217 / 5337

5344 W NORTH AVE

24.0

05/11/04

05/14/04

1,349 06/02/04

06/02/04

2,308

100

Totals per Underpass Lighting

200.0

1,349

134,308

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 388

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Locations

Work Type: LED Signal Head Install 210 06 0130 / 4389

1.0

N KEELER AVE AND W DIVISION ST

0 12/04/01

12/04/01

7,324

100

Locations

Work Type: Left Turn Arrow 210 06 0257 / 4493

N CENTRAL AVE AND W FULLERTON AVE

.50

09/15/06

08/20/07

58,700 01/17/07

04/17/07

0

100

210 06 0127 / 4386

No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07 Awaiting ADA work. Note Last Updated on 21-JUN-07 N CICERO AVE AND W DIVISION ST

1.0

10/15/06

11/15/06

110,000 05/09/06

08/17/06

97,222

100

210 06 0171 / 4420

N CICERO AVE AND W NORTH AVE

.0

03/01/07

12/31/07

210 06 / 32040

W DIVISION ST AND N LARAMIE AVE

1.0

11/01/06

12/31/07

85,000 08/08/07

210 06 0073 / 4337

waiting for cut over Note Last Updated on 17-JUN-08 800 N CICERO AVE

1.0

11/30/02

12/30/02

57,718 11/18/02

Totals per Left Turn Arrow

Work Type: New Signal

3.50

.50

Work Type: Removal Temp Wiring - Signals

Crossings

300 06 0197 / 5322

N KOLMAR AVE AND W AUGUSTA BLVD

Work Type: Signals 300 06 0096 / 5258

5344 W NORTH AVE

Work Type: TSM Install

01/15/03

311,418

0

0

75,422

99

53,170

100

225,814

Locations

N CENTRAL AVE AND W DIVISION ST

300 06 0283 / 5391

0

09/02/04

09/30/04

3.0

8,159 09/09/04

09/09/04

8,159

100

12,000 10/02/01

10/05/01

3,607

100

Intersections 41.0

11/12/03

11/20/03

0 10/31/03

11/06/03

6,483

100

Locations

814 06 0232 / 16444

800 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

92,500

100

814 06 0203 / 16415

1000 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

92,500

100

814 06 0204 / 16416

1200 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

92,500

100

814 06 0260 / 16472

1400 N CICERO AVE

1.0

08/17/89

08/17/89

0 08/17/89

08/17/89

140,000

100

814 06 0177 / 16389

1813 N CICERO AVE

1.0

09/21/94

09/21/94

0 09/21/94

09/21/94

120,000

100

800 N LAVERGNE AVE

1.0

09/07/93

09/07/93

0 09/07/93

09/07/93

89,812

100

814 06 0138 / 16352 Totals per TSM Install Totals per Traffic

6.0

0

627,312

346,377

889,200

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 389

1/1/2008 AND 12/31/2008

Ward 37 Emma Mitts CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 05 0031 / 5146

ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE

13.0

04/04/05

11/18/05

4,850 06/27/05

07/15/05

2,652

100

300 07 0037 / 5460

ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE

31.0

04/18/06

11/18/06

9,950 12/22/06

01/22/07

7,849

100

44.0

14,800

10,501

Totals per Construction Phase

3,720,006

3,588,071

Totals for Ward 37

3,991,006

3,598,943

Totals per Traffic Equipment Painting

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 390

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32146

ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE

1.0

05/01/07

10/31/07

3,900 08/23/07

09/20/07

197

100

300 06 0274 / 5382

ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

3,567

100

300 06 0274 / 5382

ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

1,784

100

300 06 0274 / 5382

ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE

.0

07/01/04

12/31/04

0 03/22/05

05/06/05

3,567

100

300 06 0308 / 5414

ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,716

100

210 06 0208 / 4451

N AUSTIN AVE AND W GRACE ST

.0

07/01/04

10/01/04

0 03/09/04

05/13/05

6,457

100

210 06 0243 / 4480

W IRVING PARK RD AND N LONG AVE

.0

12/26/06

01/26/07

500 12/26/06

01/26/07

1,275

100

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

4,400

19,563

Totals per Design/Engineering

1.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 391

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Fixtures

Work Type: 250 Watt Changeout 300 11 / 32227

N CICERO AVE AND W PATTERSON AVE

0

0

300 06 0069 / 5233

4500 W PATTERSON AVE

10.0 4.0

06/07/02

06/07/02

4,200 840 06/04/02

06/04/02

812

100

300 06 0069 / 5233

4500 W WAVELAND AVE

4.0

06/07/02

06/07/02

840 06/04/02

06/04/02

812

100

18.0

Totals per 250 Watt Changeout

5,880

1,624

Fixtures

Work Type: 400 Watt Changeout 300 11 / 32227

ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE

34.0

10/01/07

12/15/07

14,200 09/12/07

09/24/07

12,940

100

300 11 / 32227

ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD

40.0

10/01/07

12/15/07

16,400 09/15/07

09/24/07

12,392

100

300 11 / 32227

ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE

80.0

10/01/07

12/15/07

32,600 09/21/07

09/25/07

23,908

100

300 09 / 33096

ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE

2.60

10/27/08

11/01/07

1,040 10/27/08

11/01/07

993

100

300 11 / 32227

ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE

25.0

10/01/07

12/01/07

10,600 09/15/07

09/25/07

8,478

100

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

181.60

74,840

58,711

Installations

805 06 1664 / 7850

3514 N CICERO AVE

1.0

08/15/97

08/15/97

0 08/15/97

08/15/97

300

100

805 06 2030 / 8216

4200 N KILDARE AVE

1.0

09/13/95

09/13/95

0 09/13/95

09/13/95

300

100

805 06 1853 / 8039

3705 N LOWELL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

302 00 0092 / 5774

4422 N MC VICKER AVE

1.0

0 12/04/01

12/04/01

236

100

805 06 1817 / 8003

4518 N MEADE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1921 / 8107

3920 N MOBILE AVE

1.0

06/06/96

06/06/96

0 06/06/96

06/06/96

300

100

805 06 1922 / 8108

3940 N MOBILE AVE

1.0

06/06/96

06/06/96

0 06/06/96

06/06/96

300

100

805 06 1975 / 8161

4419 N MONITOR AVE

1.0

08/02/96

08/02/96

0 08/02/96

08/02/96

300

100

805 06 1900 / 8086

4237 N NARRAGANSETT AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1792 / 7978

5741 W CORNELIA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1309 / 7495

6428 W DAKIN ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1111 / 7297

4648 W GRACE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1152 / 7338

6031 W GUNNISON ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

300 06 0139 / 5289

5817 W IRVING PARK RD

1,719.0

03/01/06

09/01/06

39,894 04/10/06

04/28/06

51,938

100

302 00 0092 / 5774

5817 W IRVING PARK RD

14.0

0 03/15/01

01/17/02

3,299

100

805 06 0543 / 6729

6235 W PATTERSON AVE

1.0

0 03/13/97

03/13/97

300

100

Totals per Alley Lighting/Lamps

1,747.0

03/13/97

03/13/97

39,894

59,373

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 392

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

5817 W IRVING PARK RD

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5817 W IRVING PARK RD

Work Type: Flood Light Install

Lamps 1,450.0

06/01/07

12/31/07

42,688 09/01/07

09/15/07

42,688

100

0 04/18/02

04/21/02

24,672

100

Installations 1,355.0

Fixtures

300 06 0071 / 5234

4100 N LONG AVE

117,500 03/01/98

06/17/98

38,457

100

302 00 0092 / 5774

4250 N MELVINA AVE

2.0

0 02/16/01

02/16/01

941

100

302 00 0092 / 5774

5700 W BERTEAU AVE

2.0

0 09/21/01

09/21/01

689

100

302 00 0092 / 5774

5815 W IRVING PARK RD

1.0

0 09/21/01

09/21/01

404

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

02/01/98

06/30/98

5.0

117,500

40,491

Blocks

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts

.0

Installations

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Lighting Imprvmnts

Work Type: Loop Lighting

.0

Blocks

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

Totals per Loop Lighting Totals per Lighting/Electrical

.0

0

0

1,520,392

2,708,841

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 393

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 11 / 32227

ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE

30.0

10/01/07

12/15/07

40,500 10/10/07

10/10/07

34,200

100

300 11 / 32227

ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD

32.0

10/01/07

12/15/07

43,200 10/10/07

10/10/07

36,640

100

300 11 / 32227

ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE

53.0

10/01/07

12/15/07

71,550 10/10/07

10/10/07

60,685

100

300 09 / 33096

ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE

5.07

12/22/08

01/16/09

6,845 12/22/08

01/16/09

6,895

100

300 11 / 32227

ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE

42.0

10/01/07

12/01/07

56,700 10/10/07

10/10/07

48,090

100

Totals per Ornamental - Piggyback Lighting

162.07

218,795

186,510

Work Type: Ornamental Lighting

Blocks

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

Totals per Ornamental Lighting

Work Type: POD Camera Pole

.0

Poles

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

0

0

Totals per POD Camera Pole

Work Type: Residential Regrouping 300 06 0270 / 5378

5817 W IRVING PARK RD

Work Type: Residntl Staggered Lighting

.0

Lamps .0

03/01/08

12/01/08

Blocks

300 06 / 32146

ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE

4.0

12/05/07

03/02/08

295,049 12/28/07

300 06 0298 / 5405

ON N NEW ENGLAND AVE FROM W BYRON ST TO W GRACE ST

1.0

09/01/05

10/15/05

0 08/15/05

10/03/05

300 06 0298 / 5405

ON N NEWLAND AVE FROM W BYRON ST TO W GRACE ST

1.0

09/01/05

10/15/05

0 08/15/05

300 06 0308 / 5414

ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE

2.0

04/01/06

06/01/06

235,932 03/27/06

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0

8.0

0

50

66,215

100

10/03/05

66,215

100

05/24/06

155,625

100

530,981

288,055

Blocks

300 06 0267 / 5375

ON N KOSTNER AVE FROM W IRVING PARK RD TO W BERTEAU AVE

2.0

06/28/04

08/12/04

129,596 06/18/04

08/04/04

137,213

100

300 06 0235 / 5349

ON N MENARD AVE FROM W GRACE ST TO W IRVING PARK RD

2.0

06/01/03

08/01/03

122,608 05/21/03

07/31/03

117,302

100

Totals per Residntl Strt Lighting/Lamps

4.0

252,204

254,515

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 394

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Arterial

Locations

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

.0

Totals per Short Arm Installs - Arterial

Work Type: Short Arm Installs - Residntl

Locations

281 00 / 33670

3927 N CENTRAL AVE

.0

01/01/08

12/31/08

0

0

0

281 00 / 33670

6008 W GIDDINGS ST

.0

01/01/08

12/31/08

0

0

0

0

0

.0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

Locations

300 11 / 32227

ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE

30.0

06/15/07

07/10/07

302 00 0076 / 5764

ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE

38.0

09/01/00

12/31/00

300 11 / 32227

ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD

32.0

06/15/07

07/08/07

7,040 06/15/07

07/08/07

7,040

100

300 11 / 32227

ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE

53.0

06/15/07

07/10/07

11,660 06/15/07

07/10/07

11,660

100

300 04 0216 / 5114

ON W ADDISON ST FROM N LARAMIE AVE TO N CICERO AVE

32.0

05/01/06

11/01/06

6,705 05/17/06

07/09/06

6,705

100

300 09 / 33096

ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE

4.55

10/27/08

10/31/08

1,365 10/27/08

10/31/08

1,174

100

300 11 / 32227

ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE

42.0

07/10/07

08/01/07

9,240 07/10/07

08/01/07

9,240

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

3927 N CENTRAL AVE

300 06 0098 / 5259

3900-5100 N PULASKI RD

281 00 / 33670

6008 W GIDDINGS ST

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Strt Lighting

231.55

6,600 06/15/07

07/10/07

0

6,600

100

646

42,610

43,065

Blocks .0

01/01/08

12/31/08

0

12.0

04/01/01

02/28/03

0 04/18/01

.0

01/01/08

12/31/08

12.0

0

0

1,238,325

100

0

0

0

0

1,238,325

02/11/03

Blocks

300 06 0274 / 5382

ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE

.50

11/01/05

05/15/06

35,000 11/01/05

05/15/06

61,256

100

300 06 0274 / 5382

ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE

1.0

06/20/06

08/31/06

75,000 06/20/06

08/31/06

30,628

100

300 06 0274 / 5382

ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE

1.0

11/01/05

05/15/06

75,000 11/01/05

05/15/06

61,256

100

Totals per Strt Lighting

2.50

185,000

153,140

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 395

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

5817 W IRVING PARK RD

Lamps 1,847.0

06/01/06

12/31/06

10,000 11/16/06

11/21/06

9,604

100

Work Type: Underpass Lighting

Fixtures

302 00 0072 / 5760

4000 N KEELER AVE

1.0

0 07/16/99

11/04/99

49,326

100

805 06 2263 / 8449

4010 N KEELER AVE

8.0

08/14/96

08/14/96

0 08/14/96

08/14/96

6,000

100

805 06 2423 / 8609

4212 N KOSTNER AVE

8.0

09/06/95

09/06/95

0 09/06/95

09/06/95

6,000

100

302 00 0072 / 5760

4220 N KOSTNER AVE

1.0

0 07/02/99

08/03/99

37,841

100

805 06 2910 / 9096

3750 N MILWAUKEE AVE

10.0

07/29/94

07/29/94

0 07/29/94

07/29/94

7,500

100

805 06 2911 / 9097

3820 N MILWAUKEE AVE

6.0

07/29/94

07/29/94

0 07/29/94

07/29/94

4,500

100

302 00 0072 / 5760

3900 N PULASKI RD

1.0

0 07/01/99

08/20/99

45,260

100

302 00 0071 / 5759

4440 W ADDISON ST

0 10/13/98

10/19/98

9,795

100

805 06 2662 / 8848

4560 W ADDISON ST

0 04/16/92

04/16/92

3,000

100

302 00 0071 / 5759

4600 W ADDISON ST

0 09/25/98

10/02/98

9,096

100

805 06 2261 / 8447

4198 W IRVING PARK RD

14.0

12/09/96

12/09/96

0 12/09/96

12/09/96

10,500

100

805 06 2912 / 9098

4533 W IRVING PARK RD

13.0

07/09/93

07/09/93

0 07/09/93

07/09/93

9,750

100

805 06 2260 / 8446

4540 W IRVING PARK RD

146.0

12/13/96

12/13/96

0 12/13/96

12/13/96

109,500

100

Totals per Underpass Lighting

4.0

212.0

04/16/92

04/16/92

0

308,068

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 396

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N LAVERGNE AVE AND W ADDISON ST

1.0

0 11/22/02

11/22/02

7,324

100

210 06 0130 / 4389

N LONG AVE AND W ADDISON ST

1.0

0 10/24/01

10/24/01

8,539

100

210 06 0130 / 4389

N MELVINA AVE AND W IRVING PARK RD

1.0

0 01/29/02

01/29/02

7,324

100

210 06 0130 / 4389

N MENARD AVE AND W IRVING PARK RD

1.0

0 01/30/02

01/30/02

7,324

100

4.0

0

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

30,511

Locations

210 06 0231 / 4470

W ADDISON ST AND N CENTRAL AVE

300 05 0036 / 5151

W ADDISON ST AND N OAK PARK AVE

.50

210 06 0256 / 4492

W BELMONT AVE AND N CENTRAL AVE

.50

09/01/05

06/30/07

61,036 01/02/07

10/19/07

300 11 / 32227

Awaiting ADA work. Note Last Updated on 21-JUN-07 W IRVING PARK RD AND N KEELER AVE

1.0

02/11/08

06/15/08

44,000 02/21/08

210 06 / 32040

W IRVING PARK RD AND N OAK PARK AVE

1.0

11/01/06

12/31/07

85,000 01/16/08

300 06 0199 / 5324

W MONTROSE AVE AND N LARAMIE AVE

.50

11/01/01

11/28/01

3,078 11/07/01

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0208 / 4451

N AUSTIN AVE AND W GRACE ST

210 06 0075 / 4339

W MONTROSE AVE AND N KNOX AVE

.0

03/01/08

12/01/08

Work Type: Pedestrian Countdown Signal Install

3.50

1.0

03/21/08

46,182

100

06/04/08

124,243

100

11/08/01

4,980

100

208,940

09/15/04

200,000 07/06/04

09/02/04

155,090

100

09/01/04

11/01/04

90,500 07/26/04

07/07/05

114,304

100

290,500

269,394

Locations .0

05/04/08

12/31/08

10,500

W IRVING PARK RD AND N LONG AVE

.0

03/15/06

05/08/07

12,000 12/29/06

W BERTEAU AVE AND N NARRAGANSETT AVE

100

07/15/04

210 06 0243 / 4480

210 06 0240 / 4477

0

Locations

N AUSTIN AVE AND W IRVING PARK RD

Work Type: Pedestrian Crosswalk Signals

0 100

359,045

210 06 / 32280

Totals per Pedestrian Countdown Signal Install

0 33,535

40,250 04/06/06

1.0

Totals per New Signal

125,682

.0

22,500

02/09/07

0

0

8,248

100

8,248

Locations .0

11/01/05

08/30/07

27,760 11/01/05

23,122

Actual division doing this job wo#1061320 is construction. This is not an Operations job. Note Last Updated on 29-JAN-08 Target Construction Completion Date set for 6/15/07. Note Last Updated on 30-MAY-07 Totals per Traffic

1,256,055

2,177,739

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 397

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Signal Realignment 300 06 0199 / 5324

W IRVING PARK RD AND N NEENAH AVE

Work Type: Signals 300 06 0096 / 5258

5817 W IRVING PARK RD

Work Type: TSM Install

Intersections 1.0

05/01/01

12/01/01

11,400 03/23/01

03/30/01

13,641

100

11/01/03

11/07/03

0 10/10/03

10/17/03

4,744

100

Intersections 30.0

Locations

210 06 0072 / 4336

W GRACE ST AND N LARAMIE AVE

.50

02/12/01

04/12/01

75,000 02/01/01

04/02/01

72,768

100

814 06 0317 / 16525

3800 N CENTRAL AVE

1.0

09/01/97

09/01/97

0 09/01/97

12/23/97

200,000

100

210 06 0074 / 4338

4500 N CENTRAL AVE

1.0

02/01/03

04/01/03

141,000 12/24/02

02/10/03

155,005

100

814 06 0073 / 16289

3300 N CICERO AVE

1.0

02/14/96

02/14/96

0 02/14/96

02/14/96

107,451

100

814 06 0230 / 16442

3400 N CICERO AVE

1.0

08/21/90

08/21/90

0 08/21/90

08/21/90

37,173

100

814 06 0229 / 16441

3600 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

37,173

100

814 06 0268 / 16480

4000 N KEELER AVE

1.0

03/11/92

03/11/92

0 03/11/92

03/11/92

80,424

100

814 06 0117 / 16332

4023 N KEELER AVE

1.0

11/03/93

11/03/93

0 11/03/93

11/03/93

95,365

100

814 06 0082 / 16298

4100 N KEELER AVE

1.0

10/25/94

10/25/94

0 10/25/94

10/25/94

50,417

100

814 06 0350 / 16548

4400 N KEELER AVE

1.0

08/27/91

08/27/91

0 08/27/91

08/27/91

73,893

100

814 06 0358 / 16553

4000 N KILDARE AVE

1.0

11/25/91

11/25/91

0 11/25/91

11/25/91

73,893

100

210 06 0072 / 4336

3600 N MELVINA AVE

1.0

03/01/01

05/01/01

150,000 03/13/01

04/16/01

118,009

100

210 06 0072 / 4336

3800 N MILWAUKEE AVE

1.0

12/31/01

04/15/02

150,000

3,528

100

814 06 0054 / 16271

4000 N NARRAGANSETT AVE

1.0

11/15/95

11/15/95

0 11/15/95

11/15/95

8,586

100

814 06 0098 / 16314

4000 N NARRAGANSETT AVE

1.0

03/25/93

03/25/93

0 03/25/93

03/25/93

44,179

100

814 06 0180 / 16392

4199 N NARRAGANSETT AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

200,000

100

814 06 0261 / 16473

3999 N NATCHEZ AVE

1.0

08/08/90

08/08/90

0 08/08/90

08/08/90

110,172

100

814 06 0216 / 16428

4141 W IRVING PARK RD

1.0

12/22/95

12/22/95

0 12/22/95

12/22/95

125,000

100

300 06 0078 / 5241

6532 W IRVING PARK RD

1.0

04/01/98

12/01/98

5,000 05/18/98

05/19/98

2,254

100

Totals per TSM Install

18.50

521,000

1,595,290

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 398

1/1/2008 AND 12/31/2008

Ward 38 Thomas R. Allen CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 11 / 32227

ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE

13.0

06/15/07

07/10/07

4,450 06/15/07

07/10/07

4,450

100

300 11 / 32227

ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD

16.0

06/15/07

07/08/07

5,700 06/15/07

07/08/07

5,700

100

300 11 / 32227

ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE

26.0

06/15/07

07/16/07

9,600 06/15/07

07/16/07

9,600

100

300 11 / 32227

ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE

12.0

07/10/07

08/01/07

4,100 07/10/07

08/01/07

4,100

100

Totals per Traffic Equipment Painting

67.0

23,850

23,850

Totals per Construction Phase

2,776,447

4,886,580

Totals for Ward 38

2,780,847

4,906,143

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 399

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE

4.0

04/01/08

08/30/08

260,000 04/14/08

05/09/08

0

100

300 06 / 32275

ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST

.0

03/01/07

10/31/07

3,900 01/30/07

02/27/07

2,366

100

300 06 0308 / 5414

ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,562

100

210 06 0127 / 4386

N CICERO AVE AND W LAWRENCE AVE

.0

12/15/05

03/15/06

0

0

0

210 06 0158 / 5058

W IRVING PARK RD AND N PULASKI RD

.0

10/01/07

12/31/07

0

0

0

210 06 0158 / 5058

Needs Requirements Note Last Updated on 16-MAR-07 W LAWRENCE AVE AND N KIMBALL AVE

210 06 0209 / 4452

W LAWRENCE AVE AND N PULASKI RD

210 06 0158 / 5058

W PETERSON AVE AND N KIMBALL AVE

Totals per Design/Engineering

.0

08/15/05

12/31/05

0 08/15/05

12/31/05

235

100

1.0

07/01/04

12/31/04

0 07/01/04

12/31/04

4,044

100

.0

08/15/05

12/31/05

0 08/15/05

12/31/05

235

100

5.0

263,900

9,441

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 400

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0122 / 5275

ON N HAMLIN AVE FROM W GRACE ST TO W BYRON ST

300 06 0122 / 5275

ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

300 06 0122 / 5275

ON N KOLMAR AVE FROM N ELSTON AVE TO W CARMEN AVE

300 06 0122 / 5275

ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE

300 06 0122 / 5275

ON W AINSLIE ST FROM N PULASKI RD TO N KIMBALL AVE

300 06 0122 / 5275

ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE

300 05 0039 / 5154

3800 N HAMLIN AVE

.0

300 06 0069 / 5233

4632 N KARLOV AVE

1.0

06/30/02

06/30/02

300 06 0069 / 5233

4843 N ST LOUIS AVE

1.0

06/17/02

06/17/02

300 05 0039 / 5154

3400-4000 W AINSLIE ST

302 00 0092 / 5774

3722 W WINDSOR AVE

1.0

0 11/14/01

302 00 0092 / 5774

3734 W WINDSOR AVE

1.0

302 00 0092 / 5774

3748 W WINDSOR AVE

1.0

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

5.0

11/01/03

11/02/03

2,200 03/01/05

03/02/05

1,232

100

14.50

08/01/03

09/01/03

5,688 07/01/03

07/28/03

3,119

100

9.0

12/21/04

12/22/04

3,800 03/01/05

03/02/05

2,214

100

87.50

08/01/03

09/01/03

34,219 07/01/03

07/28/03

19,610

100

16.0

12/21/04

12/22/04

6,600 03/01/05

03/02/05

3,937

100

323.0

11/10/03

11/30/03

127,500 10/30/03

11/28/03

77,597

100

2,956

460.0

0

210 06/27/02

06/27/02

203

100

210 06/14/02

06/14/02

203

100

2,956

.0

0

0

0

11/14/01

206

100

0 11/14/01

11/14/01

206

100

0 11/14/01

11/14/01

206

100

186,339

108,732

Fixtures

300 03 0040 / 4911

ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE

7.50

07/30/04

08/30/04

3,000 07/14/04

08/10/04

1,961

100

300 03 0040 / 4911

ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE

5.07

08/20/04

09/20/04

2,028 07/14/04

08/10/04

1,325

100

300 03 0040 / 4911

ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

2.50

08/20/04

09/20/04

1,000 07/14/04

08/10/04

654

100

300 03 0039 / 4910

ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE

7.0

10/01/04

10/05/04

3,075 10/01/04

10/01/04

1,036

100

300 03 0050 / 4921

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

20.16

10/01/04

10/20/04

8,064 08/27/04

09/06/04

5,615

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

42.23

17,167

10,590

2,400,297

2,307,186

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 401

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1539 / 7725

4339 N AVERS AVE

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 0873 / 7059

4832 N BERNARD ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2087 / 8273

4825 N CENTRAL PARK AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2074 / 8260

4832 N CENTRAL PARK AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0423 / 6609

4833 N CHRISTIANA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0461 / 6647

4901 N CHRISTIANA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0389 / 6575

6215 N CICERO AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0370 / 6556

6224 N CICERO AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0351 / 6537

6323 N CICERO AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1187 / 7373

4834 N DRAKE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0952 / 7138

4137 N ELSTON AVE

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

805 06 1206 / 7392

4409 N ELSTON AVE

1.0

08/28/96

08/28/96

0 08/28/96

08/28/96

300

100

805 06 1669 / 7855

4920 N HAMLIN AVE

1.0

07/17/97

07/17/97

0 07/17/97

07/17/97

300

100

805 06 1211 / 7397

5745 N JERSEY AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 1439 / 7625

5749 N JERSEY AVE

1.0

10/25/96

10/25/96

0 10/25/96

10/25/96

300

100

805 06 1670 / 7856

4136 N KEDVALE AVE

1.0

07/18/97

07/18/97

0 07/18/97

07/18/97

300

100

805 06 1477 / 7663

5138 N KEELER AVE

1.0

11/20/97

11/20/97

0 11/20/97

11/20/97

300

100

805 06 1185 / 7371

4035 N KEYSTONE AVE

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 0590 / 6776

4240 N KEYSTONE AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 0305 / 6491

4250 N KEYSTONE AVE

1.0

03/27/95

03/27/95

0 03/27/95

03/27/95

300

100

805 06 2026 / 8212

5145 N KILBOURN AVE

1.0

05/07/96

05/07/96

0 05/07/96

05/07/96

300

100

805 06 2042 / 8228

4831 N KIMBALL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2033 / 8219

4905 N KIMBALL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1987 / 8173

5807 N KOLMAR AVE

1.0

10/08/96

10/08/96

0 10/08/96

10/08/96

300

100

805 06 1999 / 8185

5901 N KOSTNER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2000 / 8186

4856 N KRUGER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1540 / 7726

6128 N PULASKI RD

1.0

10/22/97

10/22/97

0 10/22/97

10/22/97

300

100

805 06 0637 / 6823

6063 N SAUGANASH AVE

1.0

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

805 06 0626 / 6812

4837 N SAWYER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0659 / 6845

4818 N SPAULDING AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1681 / 7867

5235 N SPAULDING AVE

1.0

06/24/97

06/24/97

0 06/24/97

06/24/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 402

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0523 / 6709

4120 N SPRINGFIELD AVE

1.0

05/24/95

05/24/95

0 05/24/95

05/24/95

300

100

805 06 0433 / 6619

4318 N SPRINGFIELD AVE

1.0

07/17/96

07/17/96

0 07/17/96

07/17/96

300

100

805 06 0406 / 6592

4927 N SPRINGFIELD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0420 / 6606

4945 N ST LOUIS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0391 / 6577

4952 N ST LOUIS AVE

1.0

06/25/96

06/25/96

0 06/25/96

06/25/96

300

100

805 06 0392 / 6578

5202 N ST LOUIS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0421 / 6607

5722 N ST LOUIS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0359 / 6545

3212 W LAWRENCE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

300 06 0139 / 5289

4404 W LAWRENCE AVE

1,686.0

03/01/06

09/01/06

39,180 04/17/06

05/01/06

50,941

100

805 06 0357 / 6543

4630 W LAWRENCE AVE

1.0

03/21/97

03/21/97

0 03/21/97

03/21/97

300

100

805 06 1688 / 7874

3717 W WILSON AVE

1.0

07/01/97

07/01/97

0 07/01/97

07/01/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

4404 W LAWRENCE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4404 W LAWRENCE AVE

Work Type: Lighting Imprvmnts 300 06 0228 / 5343

ON W FOSTER AVE FROM N KEDZIE AVE TO N KIMBALL AVE

Work Type: Lighting Imprvmnts 300 06 0199 / 5324

W PETERSON AVE AND N KOSTNER AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

4404 W LAWRENCE AVE

1,727.0

39,180

63,241

Lamps 1,428.0

06/01/07

12/31/07

42,040 09/01/07

09/15/07

42,040

100

0 04/07/02

04/10/02

24,271

100

45,000 04/16/02

04/29/02

44,952

100

18,400 11/26/01

01/24/02

16,247

100

0

0

Installations 1,333.0

Blocks 2.0

07/01/02

08/30/02

Projects 1.0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 403

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 07 0039 / 5462

ON N KEDVALE AVE FROM W ARGYLE ST TO W CARMEN AVE

1.0

07/10/06

08/25/06

65,000 09/05/06

11/27/06

64,578

100

300 06 0298 / 5405

ON N KEDVALE AVE FROM W LAWRENCE AVE TO W ARGYLE ST

2.0

07/01/05

08/10/05

0 07/01/05

08/19/05

95,592

100

300 06 / 32277

ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE

.0

05/04/08

12/31/08

0

300 07 0039 / 5462

ON N KENNETH AVE FROM W LAWRENCE AVE TO W FOSTER AVE

4.0

06/30/06

09/29/06

300,000 07/20/06

300 06 / 32275

ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST

2.0

04/01/07

12/31/07

210,094 03/28/07

300 05 0039 / 5154

ON N KILBOURN AVE FROM N ELSTON AVE TO W FOSTER AVE

300 09 / 33105

ON N KILDARE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

300 05 0039 / 5154

ON N KILPATRICK AVE FROM N ELSTON AVE TO W LAWRENCE AVE

.0

09/15/06

11/14/06

51,661

300 07 0039 / 5462

ON N KILPATRICK AVE FROM W LAWRENCE AVE TO N ELSTON AVE

1.0

04/18/06

11/18/06

33,339 12/12/06

300 05 0039 / 5154

ON N KOLMAR AVE FROM W CARMEN AVE TO N ELSTON AVE

300 07 0039 / 5462

ON N KOSTNER AVE FROM W LAWRENCE AVE TO W FOSTER AVE

4.0

06/30/06

09/29/06

300 07 0039 / 5462

ON N TRIPP AVE FROM W ARGYLE ST TO W LAWRENCE AVE

2.0

06/15/06

300 06 0308 / 5414

ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST

2.0

03/16/06

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

0

0

11/10/06

229,668

100

07/13/07

122,730

100

0

0

0

0

139,606

.0

200,000 04/01/08

4.0

12/01/08

0

0

05/18/07

0

100

0

0

300,000 07/20/06

11/10/06

229,668

100

08/18/06

140,000 07/06/06

09/06/06

109,105

100

12/31/06

118,306 07/06/06

09/06/06

118,197

100

20,347

.0

22.0

1,578,353

969,538

Blocks

300 06 0235 / 5349

ON N BERNARD ST FROM W FOSTER AVE TO W BERWYN AVE

2.0

05/15/03

07/15/03

150,943 05/05/03

06/06/03

133,764

100

300 06 0267 / 5375

ON N KOLMAR AVE FROM W CARMEN AVE TO W FOSTER AVE

1.0

07/15/04

09/15/04

69,244 06/23/04

08/16/04

62,432

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

4246 N LAWNDALE AVE

3.0

220,187

196,196

Locations 1.0

0 03/01/01

03/01/01

378

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 404

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 09 / 33105

ON N CHRISTIANA AVE FROM W LAWRENCE AVE TO W ARGYLE ST

7.0

09/03/08

09/19/08

1,400 09/03/08

09/19/08

840

100

300 03 0040 / 4911

ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE

7.50

05/10/04

09/10/04

1,875 05/10/04

08/01/04

2,025

100

300 03 0040 / 4911

ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE

7.54

05/10/04

09/10/04

2,262 05/10/04

08/01/04

2,036

100

300 09 / 33105

ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

13.0

09/10/08

09/24/08

3,900 09/10/08

09/24/08

2,730

100

300 03 0040 / 4911

ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

4.0

05/10/04

09/10/04

1,450 05/10/04

08/01/04

1,080

100

300 09 / 33105

ON N SAWYER AVE FROM W LAWRENCE AVE TO W CARMEN AVE

13.0

09/03/08

09/19/08

2,600 09/03/08

09/19/08

1,560

100

300 09 / 33105

ON N SPAULDING AVE FROM W LAWRENCE AVE TO W CARMEN AVE

16.0

09/03/08

09/19/08

3,200 09/03/08

09/19/08

1,920

100

300 09 / 33105

ON W AINSLIE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE

3.0

12/03/08

12/04/08

390 12/03/08

12/04/08

378

100

300 09 / 33105

ON W ARGYLE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE

5.0

12/03/08

12/04/08

650 12/03/08

12/04/08

630

100

300 03 0039 / 4910

ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE

7.0

08/27/04

09/03/04

1,750 07/01/04

07/10/04

1,731

100

300 09 / 33105

ON W CARMEN AVE FROM N KEDZIE AVE TO N SPAULDING AVE

2.0

12/03/08

12/04/08

260 12/03/08

12/04/08

252

100

302 00 0076 / 5764

ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD

70.50

04/11/98

04/17/98

0 04/11/98

04/17/98

1,199

100

300 04 0216 / 5114

ON W PETERSON AVE FROM N KOSTNER AVE TO N PULASKI RD

49.0

05/01/06

11/01/06

10,526 05/17/06

08/15/06

10,526

100

300 03 0050 / 4921

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

21.63

10/01/04

10/20/04

6,122 07/10/04

08/27/04

6,041

100

300 06 0058 / 5229

ON W THORNDALE AVE FROM N ROGERS AVE TO N KILBOURN AVE

8.0

10/20/02

10/23/02

1,120 10/29/02

10/30/02

1,120

100

302 00 0076 / 5764

4000-4800 W LAWRENCE AVE

25.0

09/01/00

12/31/00

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0098 / 5259

ON N PULASKI RD FROM W FOSTER AVE TO W BRYN MAWR AVE

300 06 0098 / 5259

ON N PULASKI RD FROM W PETERSON AVE TO W BRYN MAWR AVE

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

4404 W LAWRENCE AVE

259.17

0

425

37,505

34,492

Blocks 4.0

04/01/01

02/28/03

0 05/11/01

02/11/03

85,928

100

04/01/01

02/28/03

0 05/11/01

02/11/03

412,775

100

4.0

0

498,703

Lamps 1,364.0

06/01/06

12/31/06

10,000 11/14/06

11/21/06

9,093

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 405

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0230 / 5344

N OB KENNEDY EXPY AND W IRVING PARK RD

86.0

45,000 10/29/02

02/21/03

53,456

100

300 06 0231 / 5345

W IRVING PARK RD AND N PULASKI RD

93.0

55,000 10/07/02

01/07/03

84,822

100

805 06 2734 / 8920

4989 N ELSTON AVE

14.0

07/20/94

07/20/94

0 07/20/94

07/20/94

10,500

100

805 06 2364 / 8550

5805 N ROGERS AVE

12.0

09/27/95

09/27/95

0 09/27/95

09/27/95

9,000

100

805 06 2735 / 8921

4600 W FOSTER AVE

14.0

05/04/94

05/04/94

0 05/04/94

05/04/94

10,500

100

300 06 0217 / 5337

4404 W LAWRENCE AVE

109.0

05/17/04

05/21/04

6,127 06/03/04

06/07/04

7,926

100

805 06 2681 / 8867

4031 W PETERSON AVE

10.0

04/23/92

04/23/92

0 04/23/92

04/23/92

7,500

100

302 00 0072 / 5760

4120 W PETERSON AVE

1.0

0 02/07/00

02/16/00

10,631

100

302 00 0072 / 5760

4320 W PETERSON AVE

1.0

0 02/17/00

02/28/00

12,200

100

805 06 2365 / 8551

4399 W PETERSON AVE

8.0

0 04/27/92

04/27/92

6,000

100

Totals per Underpass Lighting

Work Type: Underpass Lighting

04/27/92

04/27/92

348.0

106,127

212,535

Locations

300 06 0230 / 5344

N OB KENNEDY EXPY AND W IRVING PARK RD

1.0

10/07/02

10/31/02

45,000 09/24/02

12/04/02

38,089

100

300 06 0231 / 5345

W IRVING PARK RD AND N PULASKI RD

1.0

10/01/02

10/31/02

55,000 09/24/02

10/23/02

38,089

100

Totals per Underpass Lighting

2.0

100,000

76,178

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 406

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N KEDZIE AVE AND W ARGYLE ST

.50

0 08/26/02

08/26/02

925

100

210 06 0130 / 4389

N PULASKI RD AND N ELSTON AVE

1.0

0 11/26/02

11/26/02

8,539

100

210 06 0130 / 4389

N PULASKI RD AND W BERTEAU AVE

1.0

0 11/26/02

11/26/02

7,324

100

210 06 0130 / 4389

N PULASKI RD AND W BRYN MAWR AVE

1.0

0 12/09/02

12/09/02

10,884

100

210 06 0130 / 4389

N PULASKI RD AND W FOSTER AVE

1.0

0 12/09/02

12/09/02

5,298

100

210 06 0130 / 4389

N PULASKI RD AND W IRVING PARK RD

1.0

0 11/26/02

11/26/02

10,841

100

210 06 0130 / 4389

N PULASKI RD AND W LAWRENCE AVE

1.0

0 12/06/02

12/06/02

8,539

100

210 06 0130 / 4389

N PULASKI RD AND W MONTROSE AVE

1.0

0 11/26/02

11/26/02

8,539

100

210 06 0130 / 4389

N PULASKI RD AND W PETERSON AVE

1.0

0 12/09/02

12/09/02

12,418

100

210 06 0130 / 4389

W DAKIN ST AND N PULASKI RD

1.0

0 11/26/02

11/26/02

6,108

100

9.50

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

0

79,415

Locations

210 06 0127 / 4386

N CICERO AVE AND W LAWRENCE AVE

.50

47,500

0

0

210 06 / 32157

N KEDZIE AVE AND W LAWRENCE AVE

.0

11/01/08

02/28/09

51,000

0

0

210 06 0158 / 5058

Awaiting for a responce from obm Note Last Updated on 04-OCT-07 W IRVING PARK RD AND N PULASKI RD

1.0

02/18/07

12/31/07

60,000

210 06 0158 / 5058

W LAWRENCE AVE AND N KIMBALL AVE

.50

06/22/06

12/31/07

30,000 06/22/06

210 06 / 32157

NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07 W LAWRENCE AVE AND N PULASKI RD

1.0

05/01/07

01/05/07

28,000 05/01/07

210 06 0209 / 4452

W LAWRENCE AVE AND N PULASKI RD

1.0

10/01/05

08/15/06

66,900 08/23/05

210 06 0231 / 4470

W MONTROSE AVE AND N PULASKI RD

.0

03/01/08

12/01/08

210 06 0158 / 5058

W PETERSON AVE AND N KIMBALL AVE

.50

06/02/06

02/19/07

Totals per Left Turn Arrow

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N KOSTNER AVE AND W FOSTER AVE

Work Type: Signal Realignment 300 06 0225 / 5340 Totals per Traffic

N ELSTON AVE AND N PULASKI RD

4.50

85

0

22,347

95

08/28/07

29,285

100

08/15/06

37,250

60

103,482 30,000 06/22/06

03/02/07

416,882

0

0

33,249

100

122,216

Crossings 2.0

8,000 01/16/02

04/08/02

18,374

100

6,000 08/15/04

10/13/04

4,055

100

Intersections 1.0

09/13/04

09/20/04

650,982

1,695,686

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 407

1/1/2008 AND 12/31/2008

Ward 39 Margaret Laurino CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: Signals 300 06 0096 / 5258

4404 W LAWRENCE AVE

Work Type: TSM Install

Intersections 23.0

11/09/03

11/16/03

0 10/08/03

10/15/03

3,637

100

Locations

210 06 0074 / 4338

N KEELER AVE AND W LAWRENCE AVE

1.0

05/01/03

07/01/03

138,000 09/17/02

03/07/03

114,877

100

300 06 0199 / 5324

W PETERSON AVE AND N PULASKI RD

1.0

09/01/01

10/01/02

82,100 09/17/01

08/19/02

89,597

100

814 06 0114 / 16329

4800 N CENTRAL PARK AVE

1.0

01/28/92

01/28/92

0 01/28/92

01/28/92

103,623

100

814 06 0307 / 16519

4140 N ELSTON AVE

1.0

03/04/92

03/04/92

0 03/04/92

03/04/92

134,857

100

814 06 0331 / 16534

4400 N ELSTON AVE

1.0

09/13/91

09/13/91

0 09/13/91

09/13/91

106,875

100

814 06 0279 / 16491

4665 N ELSTON AVE

1.0

01/22/92

01/22/92

0 01/22/92

01/22/92

134,857

100

814 06 0278 / 16490

4801 N ELSTON AVE

1.0

02/25/92

02/25/92

0 02/25/92

02/25/92

134,857

100

814 06 0081 / 16297

4000 N PULASKI RD

1.0

11/02/94

11/02/94

0 11/02/94

11/02/94

135,031

100

814 06 0376 / 16566

4000 N PULASKI RD

1.0

03/13/92

03/13/92

0 03/13/92

03/13/92

73,893

100

814 06 0297 / 16509

4200 N PULASKI RD

1.0

11/21/91

11/21/91

0 11/21/91

11/21/91

106,875

100

814 06 0293 / 16505

4400 N PULASKI RD

1.0

09/12/91

09/12/91

0 09/12/91

09/12/91

106,875

100

814 06 0237 / 16449

3600 W FOSTER AVE

1.0

01/01/90

01/01/90

0 01/01/90

01/01/90

6,200

100

814 06 0200 / 16412

4030 W FOSTER AVE

1.0

11/04/96

11/04/96

0 11/04/96

11/04/96

150,000

100

814 06 0110 / 16325

4100 W IRVING PARK RD

1.0

10/28/94

10/28/94

0 10/28/94

10/28/94

61,572

100

814 06 0239 / 16451

4000 W PETERSON AVE

1.0

01/01/91

01/01/91

0 01/01/91

01/01/91

8,000

100

15.0

220,100

1,467,989

Totals per Construction Phase

3,051,279

4,002,872

Totals for Ward 39

3,315,179

4,012,313

Totals per TSM Install

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 408

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE

.0

04/01/08

08/30/08

0

300 05 0047 / 5162

ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST

.0

07/17/06

07/30/06

0 07/17/06

300 06 / 32277

.0

04/01/08

08/30/08

0

300 06 / 32146

ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON AVE ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

1.0

05/01/07

10/31/07

15,000 05/31/07

300 06 / 32146

ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE

.0

05/01/07

10/31/07

3,900 06/15/07

300 06 0308 / 5414

ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE

.0

02/01/06

07/31/06

300 05 0047 / 5162

ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE

.0

07/17/06

210 06 0240 / 4477

N LINCOLN AVE AND W CATALPA AVE

.0

300 06 0282 / 5390

W PETERSON AVE AND N RICHMOND ST

281 00 / 33670

2800 W LAWRENCE AVE

300 06 0282 / 5390

3019 W PETERSON AVE

Totals per Design/Engineering

0

0

0

0

0

0

06/28/07

0

100

08/01/07

2,000

100

0 02/01/06

07/31/06

3,930

100

07/30/06

0 07/17/06

07/30/06

0

0

10/10/05

07/31/06

1,500 10/10/05

11/14/06

1,262

100

500 09/17/04

10/06/04

500

100

.0

01/01/08

12/31/08

1.0

11/02/04

11/22/04

.50

2.50

07/30/06

0 2,500 11/01/04 23,400

11/17/04

0

0

2,330

100

10,022

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 409

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0307 / 5413

ON N ARTESIAN AVE FROM W PETERSON AVE TO W GLENLAKE AVE

5.0

02/15/06

05/31/06

2,000 01/16/06

02/10/06

1,242

100

300 06 0307 / 5413

ON N BELL AVE FROM N BOWMANVILLE AVE TO W BERWYN AVE

1.0

02/23/06

05/31/06

400 01/16/05

02/10/06

248

100

300 06 0307 / 5413

ON N CHRISTIANA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

9.0

03/02/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N DAMEN AVE FROM W PETERSON AVE TO W GRANVILLE AVE

9.0

02/10/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N GLENWOOD AVE FROM W GRANVILLE AVE TO W DEVON AVE

7.0

02/01/06

05/31/06

2,800 01/16/05

02/10/06

1,739

100

300 06 0307 / 5413

ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE

2.0

02/01/06

05/31/06

800 01/16/05

02/10/06

497

100

300 06 0307 / 5413

ON N HAMILTON AVE FROM W NORWOOD ST TO W GRANVILLE AVE

6.0

02/10/06

05/31/06

2,400 01/16/05

02/10/06

1,491

100

300 06 0307 / 5413

ON N HERMITAGE AVE FROM W BRYN MAWR AVE TO W ROSEHILL DR

7.0

02/13/06

05/31/06

2,800 01/16/05

02/10/06

1,739

100

300 06 0307 / 5413

ON N HERMITAGE AVE FROM W DEVON AVE TO W GRANVILLE AVE

10.0

02/03/06

05/31/06

4,000 01/16/05

02/10/06

2,484

100

300 06 0307 / 5413

ON N HERMITAGE AVE FROM W GRANVILLE AVE TO N RIDGE AVE

9.0

02/07/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N HONORE ST FROM W FOSTER AVE TO W FARRAGUT AVE

2.0

02/21/06

05/31/06

800 01/16/05

02/10/06

487

100

300 06 0307 / 5413

ON N HOYNE AVE FROM W FOSTER AVE TO W RASCHER AVE

6.0

02/20/06

05/31/06

2,400 01/16/05

02/10/06

1,491

100

300 06 0307 / 5413

ON N HOYNE AVE FROM W NORWOOD ST TO W GRANVILLE AVE

5.0

02/10/06

05/31/06

2,000 01/16/05

02/10/06

1,242

100

300 06 0307 / 5413

ON N LAKEWOOD AVE FROM W ROSEMONT AVE TO W DEVON AVE

4.0

02/01/06

05/31/06

1,600 01/16/05

02/10/06

994

100

300 06 0307 / 5413

ON N LEAVITT ST FROM N BOWMANVILLE AVE TO W FOSTER AVE

4.0

02/23/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON N MAGNOLIA AVE FROM W ROSEMONT AVE TO W DEVON AVE

4.0

02/01/06

05/31/06

1,600 01/16/05

02/10/06

994

100

300 06 0307 / 5413

ON N MAPLEWOOD AVE FROM N LINCOLN AVE TO W BRYN MAWR AVE

3.0

02/28/06

05/31/06

1,200 01/16/05

02/10/06

745

100

300 06 0307 / 5413

ON N OAKLEY AVE FROM N BOWMANVILLE AVE TO W FOSTER AVE

3.0

02/23/06

05/31/06

1,200 01/16/05

02/10/06

746

100

300 06 0307 / 5413

ON N OAKLEY AVE FROM W PETERSON AVE TO W GLENLAKE AVE

4.0

02/14/06

05/31/06

1,600 01/16/05

02/10/06

994

100

300 06 0307 / 5413

ON N PAULINA ST FROM W FOSTER AVE TO W GREGORY ST

14.0

02/20/06

05/31/06

5,600 01/16/05

02/10/06

3,478

100

300 06 0307 / 5413

ON N PAULINA ST FROM W GRANVILLE AVE TO W DEVON AVE

9.0

02/03/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE

9.0

02/07/06

05/31/06

3,600 01/16/05

02/10/06

2,237

100

300 06 0069 / 5233

ON N RAVENSWOOD AVE FROM W FOSTER AVE TO W BERWYN AVE

5.0

06/30/02

06/30/02

1,050 06/27/02

06/27/02

1,015

100

300 06 0307 / 5413

ON N RAVENSWOOD AVE FROM W ROSEHILL DR TO W BRYN MAWR AVE

7.0

02/13/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 09 / 33101

ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE

.34

09/02/08

09/03/08

136 09/02/08

09/03/08

81

100

300 06 0307 / 5413

ON N RIDGE AVE FROM N RAVENSWOOD AVE TO W PETERSON AVE

10.0

02/08/06

05/31/06

4,000 01/16/05

02/10/06

2,485

100

300 06 0307 / 5413

ON N SAWYER AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

8.0

03/01/06

05/31/06

3,200 01/16/05

02/10/06

1,989

100

300 06 0307 / 5413

ON N SEELEY AVE FROM W NORWOOD ST TO W HOOD AVE

4.0

02/10/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON N SPAULDING AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE

9.0

03/01/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N WAYNE AVE FROM W ROSEMONT AVE TO W DEVON AVE

3.0

02/01/06

05/31/06

1,200 01/16/05

02/10/06

745

100

300 06 0307 / 5413

ON N WINCHESTER AVE FROM W FOSTER AVE TO W BALMORAL AVE

4.0

02/20/06

05/31/06

1,600 01/16/05

02/10/06

994

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 410

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0307 / 5413

ON N WINCHESTER AVE FROM W PETERSON AVE TO W GRANVILLE AVE

9.0

02/09/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N WOLCOTT AVE FROM W PETERSON AVE TO W GRANVILLE AVE

9.0

02/09/06

05/31/06

3,600 01/16/05

02/10/06

2,236

100

300 06 0307 / 5413

ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE

8.50

02/21/06

05/31/06

3,400 01/16/05

02/10/06

2,113

100

300 06 0307 / 5413

ON W BALMORAL AVE FROM N LINCOLN AVE TO N WESTERN AVE

5.0

02/28/06

05/31/06

2,000 01/16/05

02/10/06

1,242

100

300 06 0307 / 5413

ON W BALMORAL AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE

7.0

02/17/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE

7.0

02/17/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE

24.0

02/25/06

05/31/06

9,600 01/16/05

02/10/06

5,963

100

300 06 0307 / 5413

ON W BERWYN AVE FROM N WESTERN AVE TO N LINCOLN AVE

6.0

02/26/06

05/31/06

2,400 01/16/05

02/10/06

1,491

100

300 06 0307 / 5413

ON W CATALPA AVE FROM N KIMBALL AVE TO N KEDZIE AVE

6.0

02/28/06

05/31/06

2,400 01/16/05

02/10/06

1,491

100

300 06 0307 / 5413

ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST

3.0

03/02/06

05/31/06

1,200 01/16/05

02/10/06

745

100

300 06 0307 / 5413

ON W CATALPA AVE FROM N RAVENSWOOD AVE TO N CLARK ST

7.0

02/16/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W CATALPA AVE FROM N WESTERN AVE TO N LINCOLN AVE

4.0

02/28/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON W EDGEWATER AVE FROM N HERMITAGE AVE TO N CLARK ST

5.0

02/15/06

05/31/06

2,000 01/16/05

02/10/06

1,242

100

300 06 0307 / 5413

ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE

8.0

02/20/06

05/31/06

3,200 01/16/05

02/10/06

1,989

100

300 06 0307 / 5413

ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE

17.0

02/26/06

05/31/06

6,800 01/16/05

02/10/06

4,225

100

300 06 0307 / 5413

ON W GLENLAKE AVE FROM N HERMITAGE AVE TO N CLARK ST

5.0

02/08/06

05/31/06

2,000 01/16/05

02/10/06

1,242

100

300 06 0307 / 5413

ON W GRANVILLE AVE FROM N GREENVIEW AVE TO N CLARK ST

6.0

02/02/06

05/31/06

2,400 01/16/05

02/10/06

1,491

100

300 06 0307 / 5413

ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE

16.50

02/07/06

05/31/06

6,600 01/16/05

02/10/06

4,100

100

300 06 0307 / 5413

ON W GREGORY ST FROM N RAVENSWOOD AVE TO N ASHLAND AVE

7.0

02/16/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W HIGHLAND AVE FROM N CLARK ST TO N RAVENSWOOD AVE

9.0

02/06/06

05/31/06

3,600 01/16/05

02/10/06

2,237

100

300 06 0307 / 5413

ON W HIGHLAND AVE FROM N GLENWOOD AVE TO N CLARK ST

4.0

02/02/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON W HOLLYWOOD AVE FROM N HERMITAGE AVE TO N CLARK ST

5.0

02/14/06

05/31/06

2,000 01/16/05

02/10/06

1,243

100

300 06 0307 / 5413

ON W HOLLYWOOD AVE FROM N JERSEY AVE TO N SPAULDING AVE

3.0

03/01/06

05/31/06

1,200 01/16/05

02/10/06

746

100

300 06 0307 / 5413

ON W HOOD AVE FROM N DAMEN AVE TO N RAVENSWOOD AVE

7.0

02/14/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W HOOD AVE FROM N HAMILTON AVE TO N SEELEY AVE

2.0

02/08/06

05/31/06

800 01/16/05

02/10/06

497

100

300 06 0307 / 5413

ON W NORWOOD ST FROM N RAVENSWOOD AVE TO N HAMILTON AVE

11.0

02/08/06

05/31/06

4,400 01/16/05

02/10/06

2,733

100

300 06 0307 / 5413

ON W OLIVE AVE FROM N JERSEY AVE TO N SPAULDING AVE

3.0

02/28/06

05/31/06

1,200 01/16/05

02/10/06

745

100

300 06 0307 / 5413

ON W OLIVE AVE FROM N RAVENSWOOD AVE TO N CLARK ST

10.0

02/13/06

05/31/06

4,000 01/16/05

02/10/06

2,485

100

300 06 0307 / 5413

ON W RASCHER AVE FROM N DAMEN AVE TO N HOYNE AVE

4.0

02/24/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON W RASCHER AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE

7.0

02/16/06

05/31/06

2,800 01/16/05

02/10/06

1,729

100

300 06 0307 / 5413

ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY

1.50

02/02/06

05/31/06

600 01/16/05

02/10/06

373

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 411

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0307 / 5413

ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N CLARK ST

8.0

02/02/06

05/31/06

3,200 01/16/05

02/10/06

1,988

100

300 06 0307 / 5413

7.0

02/17/06

05/31/06

2,800 01/16/05

02/10/06

1,728

100

300 06 0307 / 5413

ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N LEAVITT ST

16.0

02/25/06

05/31/06

6,400 01/16/05

02/10/06

3,975

100

300 06 0307 / 5413

ON W THOME AVE FROM N GLENWOOD AVE TO N CLARK ST

8.0

02/02/06

05/31/06

3,200 01/16/05

02/10/06

1,989

100

300 06 0307 / 5413

ON W THOME AVE FROM N RAVENSWOOD AVE TO N CLARK ST

8.0

02/06/06

05/31/06

3,200 01/16/05

02/10/06

1,988

100

300 06 0307 / 5413

ON W VICTORIA ST FROM N JERSEY AVE TO N SPAULDING AVE

3.0

03/01/06

05/31/06

1,200 01/16/05

02/10/06

826

100

300 06 0069 / 5233

6444 N BOSWORTH AVE

1.0

03/24/02

03/24/02

210 03/21/02

03/21/02

203

100

300 03 0040 / 4911

5850 N LINCOLN AVE

229.0

10/01/04

10/31/04

85,875 10/18/04

10/29/04

50,465

100

300 06 0069 / 5233

1515 W ARTHUR AVE

1.0

03/24/02

03/24/02

210 03/21/02

03/21/02

203

100

300 06 0069 / 5233

1509 W SCHREIBER AVE

1.0

03/24/02

03/24/02

210 03/21/02

03/21/02

203

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

690.84

269,091

164,847

3,870,472

1,864,526

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 412

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 03 0040 / 4911

ON N ASHLAND AVE FROM W FOSTER AVE TO W ROSEHILL DR

110.0

08/20/04

09/20/04

44,000 07/14/04

08/10/04

28,755

100

300 03 0040 / 4911

ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE

8.0

08/20/04

09/20/04

3,200 07/14/04

08/10/04

2,092

100

300 03 0040 / 4911

ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE

119.0

10/01/04

10/31/04

47,600 08/09/04

09/03/04

31,108

100

300 06 0307 / 5413

ON N DAMEN AVE FROM W BALMORAL AVE TO N BOWMANVILLE AVE

7.0

02/20/06

05/31/06

2,800 01/16/05

02/10/06

1,739

100

300 03 0040 / 4911

ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE

20.0

08/20/04

09/20/04

8,000 07/14/04

08/10/04

5,228

100

300 03 0040 / 4911

ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE

7.50

07/30/04

08/30/04

3,000 07/14/04

08/10/04

1,961

100

300 03 0040 / 4911

ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE

33.93

08/20/04

09/20/04

13,572 07/14/04

08/10/04

8,870

100

300 03 0040 / 4911

ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

2.50

08/20/04

09/20/04

1,000 07/14/04

08/10/04

654

100

300 03 0040 / 4911

ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE

163.0

08/20/04

09/20/04

65,200 07/14/04

08/10/04

42,610

100

300 03 0047 / 4918

ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE

5.0

11/01/04

11/20/04

2,000 10/01/04

10/15/04

2,087

100

300 03 0040 / 4911

ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE

162.75

08/20/04

09/20/04

65,100 07/14/04

08/10/04

42,544

100

300 03 0040 / 4911

ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE

55.0

08/20/04

09/20/04

22,000 07/14/04

08/10/04

14,378

100

300 03 0039 / 4910

ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE

21.0

10/01/04

10/05/04

9,225 10/01/04

10/01/04

3,108

100

300 03 0040 / 4911

ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE

54.0

08/20/04

09/20/04

21,600 07/14/04

08/10/04

14,116

100

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

78.10

08/20/04

09/20/04

31,240 07/14/04

08/10/04

20,416

100

300 03 0047 / 4918

ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE

18.0

11/01/04

11/20/04

7,200 10/01/04

10/15/04

5,167

100

300 06 0122 / 5275

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

1.89

12/15/03

12/21/03

756 12/09/03

12/14/03

549

100

300 06 0307 / 5413

ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE

.50

02/02/06

05/31/06

200 01/16/05

02/10/06

124

100

300 03 0040 / 4911

ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE

10.08

08/20/04

09/20/04

4,032 07/14/04

08/10/04

2,635

100

300 03 0040 / 4911

ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE

127.98

08/20/04

09/20/04

51,192 08/01/04

08/20/04

33,455

100

300 03 0050 / 4921

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

29.76

10/01/04

10/20/04

11,904 08/27/04

09/06/04

8,288

100

Totals per 400 Watt Changeout

1,034.99

414,821

269,881

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 413

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0746 / 6932

5638 N ARTESIAN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0803 / 6989

4862 N CALIFORNIA AVE

1.0

06/10/96

06/10/96

0 06/10/96

06/10/96

300

100

302 00 0083 / 5768

5716 N CLARK ST

0 11/18/97

11/18/97

267

100

805 06 1270 / 7456

5716 N CLARK ST

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1550 / 7736

6327 N LAKEWOOD AVE

1.0

10/09/97

10/09/97

0 10/09/97

10/09/97

300

100

805 06 1658 / 7844

6333 N LAKEWOOD AVE

1.0

08/01/97

08/01/97

0 08/01/97

08/01/97

300

100

805 06 2025 / 8211

6417 N LAKEWOOD AVE

1.0

05/13/96

05/13/96

0 05/13/96

05/13/96

300

100

805 06 0320 / 6506

5214 N LINCOLN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2073 / 8259

5252 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2075 / 8261

5311 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2076 / 8262

5331 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2077 / 8263

5336 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2078 / 8264

5405 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2063 / 8249

5411 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2080 / 8266

5427 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2071 / 8257

5430 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2082 / 8268

5438 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2083 / 8269

5441 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2084 / 8270

5455 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2057 / 8243

5566 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2058 / 8244

5570 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2072 / 8258

5617 N LINCOLN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2059 / 8245

5651 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2060 / 8246

5659 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2061 / 8247

5660 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2062 / 8248

5672 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2081 / 8267

5694 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0312 / 6498

5710 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0303 / 6489

5724 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2079 / 8265

5740 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0306 / 6492

5750 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 414

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0307 / 6493

5758 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0308 / 6494

5800 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0309 / 6495

5808 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2094 / 8280

5811 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0311 / 6497

5816 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

300 06 0139 / 5289

5850 N LINCOLN AVE

1,001.0

03/01/06

09/01/06

24,994 05/20/06

06/01/06

30,244

100

302 00 0092 / 5774

5850 N LINCOLN AVE

8.0

0 03/16/01

12/19/01

1,885

100

805 06 0302 / 6488

5854 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0313 / 6499

5915 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0314 / 6500

5921 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0315 / 6501

5930 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2088 / 8274

5938 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2089 / 8275

5944 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 2090 / 8276

5951 N LINCOLN AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 1886 / 8072

5523 N MAPLEWOOD AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 1870 / 8056

5541 N MAPLEWOOD AVE

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 1925 / 8111

6443 N NEWGARD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1906 / 8092

6516 N NEWGARD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0692 / 6878

5543 N ROCKWELL ST

1.0

08/13/96

08/13/96

0 08/13/96

08/13/96

300

100

805 06 0498 / 6684

5523 N SPAULDING AVE

1.0

01/26/96

01/26/96

0 01/26/96

01/26/96

300

100

805 06 0885 / 7071

2859 W BERWYN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0837 / 7023

2544 W CARMEN AVE

1.0

06/21/96

06/21/96

0 06/21/96

06/21/96

300

100

805 06 0828 / 7014

2608 W CARMEN AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1109 / 7295

1420 W HIGHLAND AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1110 / 7296

3243 W HOLLYWOOD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0577 / 6763

3229 W OLIVE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0431 / 6617

1921 W SUMMERDALE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1750 / 7936

2610 W WINONA ST

1.0

05/22/97

05/22/97

0 05/22/97

05/22/97

300

100

Totals per Alley Lighting/Lamps

1,065.0

24,994

49,196

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 415

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0238 / 5352

5850 N LINCOLN AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5850 N LINCOLN AVE

Work Type: Flood Light Install

Lamps 1,400.0

06/01/07

12/31/07

41,216 07/21/07

01/01/08

41,216

100

0 04/17/02

04/20/02

23,762

100

Installations 1,305.0

Fixtures

300 06 0167 / 5306

N CLARK ST AND W SCHREIBER AVE

3.0

0 11/30/99

11/30/99

1,053

100

300 06 0167 / 5306

N PAULINA ST AND W GREGORY ST

3.0

0 11/30/99

11/30/99

1,053

100

302 00 0092 / 5774

4911 N FRANCISCO AVE

1.0

0 02/05/01

02/05/01

471

100

302 00 0092 / 5774

6559 N GLENWOOD AVE

2.0

0 10/10/01

10/10/01

689

100

302 00 0092 / 5774

1339 W LOYOLA AVE

1.0

0 10/10/01

10/10/01

345

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

2800 W LAWRENCE AVE

Work Type: Lighting Imprvmnts 281 00 / 33670

2800 W LAWRENCE AVE

Work Type: Lighting Imprvmnts 300 06 0282 / 5390

W PETERSON AVE AND N RICHMOND ST

Work Type: Loop Lighting 281 00 / 33670

2800 W LAWRENCE AVE

Work Type: Ornamental - Piggyback Lighting

10.0

0

3,611

Blocks .0

01/01/08

12/31/08

0

0

0

01/01/08

12/31/08

0

0

0

10/06/04

10/31/04

0

0

0

01/01/08

12/31/08

0

0

0

Installations .0

Projects .0

Blocks .0

Fixtures

300 03 0040 / 4911

ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE

16.0

08/20/04

09/20/04

21,600 08/10/04

08/10/04

19,200

100

300 03 0040 / 4911

ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE

14.0

10/01/04

10/10/04

18,900 10/01/04

10/10/04

17,500

100

300 06 0307 / 5413

ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST

3.0

03/02/06

05/31/06

6,000 01/16/05

02/10/06

4,500

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting 281 00 / 33670

2800 W LAWRENCE AVE

33.0

46,500

41,200

0

0

Blocks .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 416

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670

2800 W LAWRENCE AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

5850 N LINCOLN AVE

Work Type: Residntl Staggered Lighting

Poles .0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Lamps .0

Blocks

300 07 0040 / 5463

ON N CALIFORNIA AVE FROM W BALMORAL AVE TO W FOSTER AVE

2.0

04/18/06

11/18/06

150,000 10/23/06

04/20/07

110,259

100

300 07 0040 / 5463

ON N CALIFORNIA AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE

2.0

04/18/06

11/18/06

150,000 10/23/06

04/20/07

110,565

100

300 09 / 33106

ON N LAKEWOOD AVE FROM W DEVON AVE TO W ARTHUR AVE

1.0

65,000 04/01/08

12/01/08

0

0

300 09 / 33106

ON N MAGNOLIA AVE FROM W DEVON AVE TO W ARTHUR AVE

1.0

65,000 04/01/08

12/01/08

0

0

300 09 / 33106

ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE

2.0

130,000 04/01/08

12/01/08

0

0

300 09 / 33106

ON N RICHMOND ST FROM W BRYN MAWR AVE TO N LINCOLN AVE

3.0

162,500 04/01/08

12/01/08

0

0

300 06 / 32277

ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE

.0

05/04/08

12/31/08

0

0

0

300 06 / 32277

.0

05/04/08

12/31/08

0

0

0

300 05 0040 / 5155

ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON AVE ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BERWYN AVE

1.0

04/04/05

11/18/05

85,000 09/07/05

11/18/05

65,615

100

300 06 0298 / 5405

ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

2.0

09/07/05

11/07/05

0 09/07/05

11/17/05

62,821

100

300 09 / 33106

ON N WAYNE AVE FROM W DEVON AVE TO W ARTHUR AVE

1.0

65,000 04/01/08

12/01/08

0

0

300 07 0040 / 5463

ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE

.50

100

300 09 / 33106

ON W ARTHUR AVE FROM N GLENWOOD AVE TO N LAKEWOOD AVE

1.0

300 11 / 32229

ON W BALMORAL AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

300 11 / 32229

ON W BERWYN AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

300 06 / 32146

ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

300 11 / 32229

ON W FARRAGUT AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

300 06 / 32146

ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE

300 11 / 32229 300 06 0308 / 5414 300 11 / 32229

07/17/06

09/08/06

42,500 08/14/06

10/13/06

38,578

65,000 04/01/08

12/01/08

0

0

08/13/07

12/21/07

120,000 08/13/07

0

10

08/06/07

01/31/08

2.0

08/10/07

01/31/08

330,125

ON W RASCHER AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

08/16/07

12/21/07

120,000 08/16/07

ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE

2.0

06/20/06

09/08/06

191,486 06/20/06

ON W SUMMERDALE AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

2.0

Totals per Residntl Staggered Lighting

32.50

108,000 08/13/07 330,125 08/16/07

12/04/07

108,000 08/16/07

108,000 08/20/07 2,395,736

0

10

0

100

0

5

02/04/08

0

100

0

5

09/08/06

129,120

100

0

5

516,958

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 417

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375

ON N VIRGINIA AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE

300 06 0305 / 5411

ON W BRYN MAWR AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

2800 W LAWRENCE AVE

Work Type: Short Arm Installs - Residntl

Blocks 2.0

03/22/04

05/22/04

147,308 03/22/04

05/07/04

145,067

100

2.50

11/01/05

01/31/06

200,000 11/08/05

03/17/06

174,554

100

4.50

347,308

319,621

0

0

0

Locations .0

01/01/08

12/31/08

Locations

302 00 0092 / 5774

4811 N FRANCISCO AVE

1.0

0 02/05/01

02/05/01

378

100

302 00 0092 / 5774

4812 N FRANCISCO AVE

1.0

0 03/27/01

03/27/01

378

100

302 00 0092 / 5774

4833 N FRANCISCO AVE

1.0

0 02/05/01

02/05/01

378

100

302 00 0092 / 5774

4851 N FRANCISCO AVE

1.0

0 02/05/01

02/05/01

378

100

302 00 0092 / 5774

1455 W ARTHUR AVE

1.0

0 03/14/01

03/14/01

378

100

281 00 / 33670

2800 W LAWRENCE AVE

.0

302 00 0092 / 5774

2902 W LAWRENCE AVE

2.0

0 03/27/01

7.0

0

Totals per Short Arm Installs - Residntl

01/01/08

12/31/08

0 03/27/01

0

0

756

100

2,646

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 418

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 03 0040 / 4911

ON N ASHLAND AVE FROM W ROSEHILL DR TO W FOSTER AVE

114.0

05/10/04

09/10/04

34,000 05/10/04

08/01/04

30,780

100

300 03 0040 / 4911

ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE

8.0

05/10/04

09/10/04

2,200 05/10/04

08/01/04

2,160

100

300 03 0040 / 4911

ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE

128.0

10/01/04

10/31/04

39,100 08/01/04

09/01/04

34,560

100

300 03 0040 / 4911

ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE

22.0

05/10/04

09/10/04

6,400 05/10/04

08/01/04

5,940

100

300 03 0040 / 4911

ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE

7.50

05/10/04

09/10/04

1,875 05/10/04

08/01/04

2,025

100

300 03 0040 / 4911

ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE

50.46

05/10/04

09/10/04

15,138 05/10/04

08/01/04

13,624

100

300 03 0040 / 4911

ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE

4.0

05/10/04

09/10/04

1,450 05/10/04

08/01/04

1,080

100

300 03 0040 / 4911

ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE

174.0

05/10/04

09/10/04

50,650 05/10/04

08/01/04

46,980

100

300 03 0047 / 4918

ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE

5.50

11/01/04

11/20/04

1,750 10/01/04

10/20/04

1,298

100

300 03 0040 / 4911

ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE

150.66

05/10/04

09/10/04

41,339 05/10/04

08/01/04

40,678

100

300 03 0040 / 4911

ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE

58.0

05/10/04

09/10/04

14,125 05/10/04

08/01/04

15,660

100

300 03 0039 / 4910

ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE

21.0

08/27/04

09/03/04

5,250 07/01/04

07/10/04

5,192

100

300 03 0040 / 4911

ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE

58.0

05/10/04

09/10/04

14,125 05/10/04

08/01/04

15,660

100

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

75.97

05/10/04

09/10/04

22,862 05/10/04

08/01/04

20,512

100

300 03 0047 / 4918

ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE

21.50

11/01/04

11/20/04

6,500 10/01/04

10/20/04

5,101

100

300 06 0108 / 5263

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

2.43

03/01/04

03/10/04

717 04/12/04

05/07/04

594

100

300 03 0040 / 4911

ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE

10.71

05/10/04

09/10/04

3,276 05/10/04

08/01/04

2,892

100

300 03 0050 / 4921

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

31.93

10/01/04

10/20/04

9,037 07/10/04

08/27/04

8,918

100

300 03 0040 / 4911

ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST

157.95

05/10/04

09/10/04

38,799 05/10/04

08/01/04

42,647

100

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0078 / 5241

ON W BERWYN AVE FROM N WESTERN AVE TO N BOWMANVILLE AVE

281 00 / 33670

2800 W LAWRENCE AVE

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

5850 N LINCOLN AVE

1,101.61

308,592

296,300

Blocks 1.0

11/18/02

11/29/02

.0

01/01/08

12/31/08

1.0

8,200 11/30/02

566

100

0

11/30/02

0

0

8,200

566

Lamps 2,068.0

03/01/04

12/01/04

10,754 11/09/06

11/30/06

22,520

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 419

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0217 / 5337

5850 N LINCOLN AVE

58.0

302 00 0072 / 5760

6400 N RAVENSWOOD AVE

805 06 2531 / 8717

6088 N RIDGE AVE

14.0

03/09/95

805 06 2327 / 8513

1270 W ALBION AVE

18.0

805 06 2842 / 9028

1805 W BALMORAL AVE

805 06 2736 / 8922

1800 W BRYN MAWR AVE

805 06 2913 / 9099

1800 W FOSTER AVE

805 06 2676 / 8862

3,260 06/08/04

06/10/04

3,469

100

0 02/29/00

03/09/00

11,800

100

03/09/95

0 03/09/95

03/09/95

10,500

100

05/13/96

05/13/96

0 05/13/96

05/13/96

13,500

100

6.0

12/29/93

12/29/93

0 12/29/93

12/29/93

4,500

100

10.0

11/03/94

11/03/94

0 11/03/94

11/03/94

7,500

100

6.0

12/16/93

12/16/93

0 12/16/93

12/16/93

4,500

100

1790 W GRANVILLE AVE

10.0

12/01/94

12/01/94

0 12/01/94

12/01/94

7,500

100

805 06 2150 / 8336

1305 W NORTH SHORE AVE

13.0

12/31/94

12/31/94

0 12/31/94

12/31/94

9,750

100

302 00 0071 / 5759

1330 W NORTH SHORE AVE

0 04/04/99

04/12/99

16,682

100

805 06 2528 / 8714

1800 W PETERSON AVE

805 06 2671 / 8857

1795 W ROSEHILL DR

805 06 2811 / 8997

1785 W THOME AVE

Totals per Underpass Lighting

05/25/04

06/01/04

1.0

16.0

05/04/94

05/04/94

0 05/04/94

05/04/94

12,000

100

4.0

11/01/94

11/01/94

0 11/01/94

11/01/94

3,000

100

10.0

07/28/94

07/28/94

0 07/28/94

07/28/94

7,500

100

166.0

3,260

112,201

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 420

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N LINCOLN AVE AND W CATALPA AVE

1.0

0 10/24/02

10/24/02

1,850

100

210 06 0130 / 4389

N WESTERN AVE AND W BERWYN AVE

1.0

0 04/25/02

04/25/02

7,324

100

210 06 0130 / 4389

N WESTERN AVE AND W BRYN MAWR AVE

1.0

0 04/24/02

04/24/02

8,539

100

210 06 0130 / 4389

N WESTERN AVE AND W FOSTER AVE

.50

0 05/14/02

05/14/02

925

100

210 06 0219 / 4459

N WESTERN AVE AND W FOSTER AVE

.50

04/22/05

04/23/05

5,282 04/13/05

04/13/05

4,985

100

210 06 0219 / 4459

N WESTERN AVE AND W PETERSON AVE

1.0

04/24/05

04/25/05

10,563 03/07/05

03/07/05

10,489

100

210 06 0130 / 4389

N WESTERN AVE AND W WINNEMAC AVE

.50

0 04/25/02

04/25/02

3,662

100

300 06 0225 / 5340

5800 N RICHMOND ST

4.0

8,350 07/12/02

07/25/02

14,430

100

210 06 0128 / 4387

W FOSTER AVE AND N LEAVITT ST

210 06 0231 / 4470

W PETERSON AVE AND N WESTERN AVE

10/31/02

9.50

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

09/02/02

24,195

52,204

Locations .50

12/31/01

01/31/02

7,500

0

.0

03/01/08

12/01/08

4,000

0

0

TOTAL PROJECT IS $8,000 WITH $4,000 COMING FROM THE 40TH WARD MENU UNDER 2005,2006,2007. AUTHORIZED PER OBM TO PROCEED ON 11/20/08 PER THE DIRECTOR. Note Last Updated on 21-NOV-08 .50

Totals per Left Turn Arrow

Work Type: New Signal 300 06 0283 / 5391

300 09 / 33106

0

Locations

ON N LINCOLN AVE FROM W BERWYN AVE TO W CATALPA AVE

Work Type: Pedestrian Countdown Signal Install

11,500

1.0

09/01/04

09/30/04

92 09/09/04

09/09/04

92

100

09/23/08

09/23/08

12,000 09/23/08

09/23/08

6,795

100

09/12/06

09/12/06

12,500 09/12/06

09/12/06

8,960

100

4,000 01/07/02

04/08/02

15,345

100

0 09/17/03

09/22/03

6,167

100

Locations

N CLARK ST AND W GRANVILLE AVE

1.0

SR#08-01886806 GJ#3885 COMP.09/23/08 Note Last Updated on 30-DEC-08

Work Type: Pedestrian Crosswalk Signals 210 06 0240 / 4477

N LINCOLN AVE AND W CATALPA AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

5740 N CALIFORNIA AVE

Work Type: Signals 300 06 0096 / 5258 Totals per Traffic

5850 N LINCOLN AVE

Locations 1.0

Crossings 1.0

Intersections 39.0

10/15/03

10/21/03

89,387

846,031

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 421

1/1/2008 AND 12/31/2008

Ward 40 Patrick J. O Conner CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

300 06 0166 / 5305

W HOLLYWOOD AVE AND N ASHLAND AVE

03/01/01

07/01/01

25,100 01/22/01

04/02/01

31,175

100

814 06 0196 / 16408

4800 N CALIFORNIA AVE

1.0

09/10/96

09/10/96

0 09/10/96

09/10/96

150,000

100

814 06 0088 / 16304

5200 N FRANCISCO AVE

1.0

12/02/93

12/02/93

0 12/02/93

12/02/93

84,096

100

814 06 0136 / 16350

5200 N LINCOLN AVE

1.0

04/27/93

04/27/93

0 04/27/93

04/27/93

119,631

100

814 06 0368 / 16558

5300 N LINCOLN AVE

1.0

04/10/95

04/10/95

0 04/10/95

04/10/95

110,783

100

814 06 0397 / 16584

5500 N LINCOLN AVE

1.0

04/28/95

04/28/95

0 04/28/95

04/28/95

110,783

100

814 06 0198 / 16410

4800 N ROCKWELL ST

1.0

09/10/96

09/10/96

0 09/10/96

09/10/96

150,000

100

6.0

25,100

756,468

Totals per Construction Phase

3,959,859

2,710,557

Totals for Ward 40

3,983,259

2,720,579

Totals per TSM Install

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 422

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32277

ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE

4.0

04/01/08

08/30/08

260,000 05/10/08

0

90

300 06 0308 / 5414

ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,870

100

300 06 / 32275

ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE

.0

03/01/07

10/31/07

3,900 02/09/07

03/09/07

2,605

100

210 06 0240 / 4477

N HARLEM AVE AND W HIGGINS AVE

.0

10/10/05

07/31/06

1,200 10/10/05

02/15/06

134

100

210 06 0240 / 4477

W BRYN MAWR AVE AND N HARLEM AVE

.0

10/10/05

07/31/06

1,200 10/10/05

08/08/06

135

100

Totals per Design/Engineering

4.0

266,300

4,744

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 423

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 11 / 32230

ON N SAYRE AVE FROM W DEVON AVE TO W HAYES AVE

Work Type: Alley Lighting/Lamps

Fixtures 6.0

2,600

0

0

Installations

805 06 0335 / 6521

6324 N LEONA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1896 / 8082

5610 N NAGLE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1917 / 8103

5634 N NAGLE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1898 / 8084

6158 N NAGLE AVE

1.0

05/30/96

05/30/96

0 05/30/96

05/30/96

300

100

805 06 1897 / 8083

5526 N NATOMA AVE

1.0

11/04/96

11/04/96

0 11/04/96

11/04/96

300

100

805 06 1916 / 8102

5916 N NEWARK AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

300

100

805 06 1514 / 7700

5826 N NINA AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 0592 / 6778

6509 N NORTHWEST HWY

1.0

12/20/96

12/20/96

0 12/20/96

12/20/96

300

100

805 06 0593 / 6779

6517 N NORTHWEST HWY

1.0

12/20/96

12/20/96

0 12/20/96

12/20/96

300

100

300 06 0139 / 5289

6550 N NORTHWEST HWY

1,775.0

03/01/06

09/01/06

41,106 06/01/06

07/01/06

53,630

100

302 00 0092 / 5774

6650 N NORTHWEST HWY

20.0

0 02/20/01

11/07/01

4,713

100

805 06 0574 / 6760

6623 N OKETO AVE

1.0

03/11/96

03/11/96

0 03/11/96

03/11/96

300

100

805 06 0575 / 6761

6837 N OLCOTT AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1472 / 7658

5121 N RUTHERFORD AVE

1.0

11/17/97

11/17/97

0 11/17/97

11/17/97

300

100

805 06 0833 / 7019

7459 W CATALPA AVE

1.0

01/02/96

01/02/96

0 01/02/96

01/02/96

300

100

805 06 0818 / 7004

8502 W CATALPA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0836 / 7022

8522 W CATALPA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0827 / 7013

8538 W CATALPA AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0933 / 7119

7307 W FITCH AVE

1.0

10/22/96

10/22/96

0 10/22/96

10/22/96

300

100

805 06 1119 / 7305

7629 W GREGORY ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0557 / 6743

7305 W RASCHER AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 0398 / 6584

7311 W TOUHY AVE

1.0

03/13/97

03/13/97

0 03/13/97

03/13/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

6650 N NORTHWEST HWY

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

6650 N NORTHWEST HWY

1,815.0

41,106

64,343

Lamps 1,752.0

06/01/07

12/31/07

51,578 09/01/07

09/21/07

51,578

100

0 04/09/02

04/12/02

30,171

100

Installations 1,657.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 424

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install 300 06 0167 / 5306

6220 N OLCOTT AVE

Work Type: Irrigation System - Power Supply 300 06 0166 / 5305

6308 N AVONDALE AVE

Work Type: Ornamental Lighting

Fixtures 2.0

0 01/18/99

01/18/99

702

100

05/09/00

13,235

100

Locations 1.0

04/18/00

05/09/00

11,838 04/18/00

Blocks

300 06 0117 / 5271

ON N NORTHWEST HWY FROM N NETTLETON AVE TO N SAYRE AVE

300 07 0041 / 5464

ON N NORTHWEST HWY FROM N NEWARK AVE TO N SAYRE AVE

3.0

04/18/06

11/18/06

450,000 08/14/06

300 06 0064 / 5231

ON N NORTHWEST HWY FROM N OGALLAH AVE TO N OVERHILL AVE

2.0

11/28/97

03/31/98

16,850 05/13/98

11/06/98

300 06 0064 / 5231

6700-6734 N OLMSTED AVE

.50

11/28/97

03/31/98

16,850 05/13/98

302 00 0098 / 5778

5600 W DEVON AVE

4.0

09/01/02

06/23/03

645,345 08/26/02

Totals per Ornamental Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

6650 N NORTHWEST HWY

Work Type: Residntl Staggered Lighting

1.50

35,000

11.0

0 0

15

17,909

100

11/06/98

17,909

100

06/18/03

644,104

100

1,164,045

679,922

Lamps .0

03/01/08

12/01/08

0

0

0

2.0

09/20/07

11/30/07

127,500

0

0

Blocks

300 11 / 32230

ON N OLIPHANT AVE FROM N AVONDALE AVE TO W PRATT AVE

300 06 / 32277

not issued Note Last Updated on 04-MAR-09 ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE

.0

05/04/08

12/31/08

0

0

300 06 0308 / 5414

ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE

2.0

04/06/06

06/16/06

151,613 04/07/06

06/09/06

119,178

100

300 06 / 32275

ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE

2.0

04/01/07

12/31/07

151,400 03/27/07

07/20/07

150,817

100

300 06 0298 / 5405

ON W LUNT AVE FROM N HARLEM AVE TO N ODELL AVE

2.0

06/01/05

07/01/05

0 05/13/05

07/15/05

112,118

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

8.0

0

430,513

382,113

Blocks

300 06 0235 / 5349

ON W FITCH AVE FROM N HARLEM AVE TO N ODELL AVE

2.0

09/01/03

11/01/03

145,441 08/18/03

10/29/03

131,302

100

300 06 0267 / 5375

ON W GREENLEAF AVE FROM N HARLEM AVE TO N ODELL AVE

2.0

04/19/04

06/19/04

165,110 04/23/04

06/01/04

157,132

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0194 / 5319

ON W BRYN MAWR AVE FROM N ORIOLE AVE TO N OZARK AVE

4.0

310,551

288,434

16,650

2,255

Blocks 1.50

03/01/01

04/01/01

1

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 425

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting 300 06 0246 / 5356

ON N ALGONQUIN AVE FROM N IONIA AVE TO N DOWAGIAC AVE

300 06 0246 / 5356

ON N DOWAGIAC AVE FROM N WAUKESHA AVE TO N CENTRAL AVE

300 06 0246 / 5356

Blocks .50

09/01/04

11/01/04

141,000 07/26/04

02/10/05

55,009

100

1.50

09/01/04

11/01/04

141,000 07/26/04

02/10/05

55,009

100

ON N HIAWATHA AVE FROM N MENDOTA AVE TO N MANKATO AVE

2.0

09/01/04

08/01/05

150,000 05/23/05

09/23/05

64,644

100

300 06 0246 / 5356

ON N IONIA AVE FROM N CHICORA AVE TO N CENTRAL AVE

3.0

08/01/04

03/31/05

141,000 07/26/04

02/10/05

55,009

100

300 06 0246 / 5356

ON N MANKATO AVE FROM N HIAWATHA AVE TO N IONIA AVE

1.50

09/01/04

08/01/05

115,000 05/23/05

09/23/05

64,644

100

300 06 0246 / 5356

ON N MOSELLE AVE FROM N HIAWATHA AVE TO N LEOTI AVE

.50

40,000 05/23/05

09/23/05

64,644

100

300 06 0246 / 5356

ON N MOSELLE AVE FROM N SIOUX AVE TO N IONIA AVE

1.0

75,000 05/23/05

09/23/05

64,644

100

300 06 0246 / 5356

ON N SIOUX AVE FROM N MOSELLE AVE TO N MANKATO AVE

300 06 0246 / 5356

ON N WAUKESHA AVE FROM N IONIA AVE TO N DOWAGIAC AVE

Work Type: Traffic Signal Regrouping 6550 N NORTHWEST HWY

Work Type: Underpass Lighting 300 06 0217 / 5337

09/01/04

08/01/05

115,000 05/23/05

10/03/05

64,644

100

.50

09/01/04

11/01/04

141,000 07/26/04

02/10/05

55,009

100

12.0

Totals per Strt Lighting

300 06 0139 / 5289

1.50

6650 N NORTHWEST HWY

Totals per Lighting/Electrical

1,059,000

543,256

Lamps 2,195.0

03/01/04

12/01/04

11,414 11/20/06

12/27/06

23,904

100

06/02/04

06/05/04

731 06/10/04

06/11/04

2,088

100

Fixtures 13.0

3,100,026

2,082,001

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 426

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305

7200 N OSCEOLA AVE

Work Type: LED Signal Head Install

Locations 1.0

03/15/01

04/15/01

15,000 05/03/01

05/04/01

6,451

100

Locations

210 06 0130 / 4389

N ORIOLE AVE AND W DEVON AVE

1.0

0 02/19/02

02/19/02

8,539

100

210 06 0130 / 4389

6725 N OLIPHANT AVE

1.0

0 09/25/01

09/25/01

8,539

100

2.0

0

Totals per LED Signal Head Install

Work Type: Pedestrian Countdown Signal Install

17,078

Locations

210 06 0240 / 4477

N HARLEM AVE AND W HIGGINS AVE

8.0

11/01/05

06/18/07

12,500 11/01/05

07/27/07

4,086

100

210 06 0240 / 4477

W BRYN MAWR AVE AND N HARLEM AVE

6.0

11/01/05

08/22/07

12,500 07/26/07

07/30/07

5,354

100

can not give true field for actual cost to date. No information found altho project is 100% Note Last Updated on 28-JAN-08 Totals per Pedestrian Countdown Signal Install

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N HARLEM AVE AND W PRATT BLVD

Work Type: Signals 300 06 0096 / 5258

6650 N NORTHWEST HWY

Work Type: TSM Install

14.0

25,000

9,440

Crossings 1.0

4,000 04/08/02

04/08/02

0

100

Intersections 28.0

11/14/03

11/20/03

0 09/27/03

10/05/03

4,427

100

Locations

814 06 0322 / 16529

6324 N CALDWELL AVE

1.0

10/22/89

10/22/89

0 10/22/89

10/22/89

212,397

100

814 06 0321 / 16528

6348 N CALDWELL AVE

1.0

10/22/89

10/22/89

0 10/22/89

10/22/89

212,397

100

814 06 0295 / 16507

6400 N CALDWELL AVE

1.0

10/22/89

10/22/89

0 10/22/89

10/22/89

212,397

100

814 06 0294 / 16506

6220 N CENTRAL AVE

1.0

10/22/89

10/22/89

0 10/22/89

10/22/89

212,397

100

814 06 0320 / 16527

6400 N CENTRAL AVE

1.0

06/22/89

06/22/89

0 06/22/89

06/22/89

212,397

100

814 06 0068 / 16284

5400 N CUMBERLAND AVE

1.0

08/12/94

08/12/94

0 08/12/94

08/12/94

140,000

100

814 06 0319 / 16526

6400 N LEHIGH AVE

1.0

10/22/89

10/22/89

0 10/22/89

10/22/89

212,397

100

814 06 0169 / 16381

5800 N NAGLE AVE

1.0

09/28/90

09/28/90

0 09/28/90

09/28/90

103,851

100

210 06 0072 / 4336

5200 N RUTHERFORD AVE

1.0

03/01/01

05/01/01

150,000 04/11/01

08/01/01

150,853

100

814 06 0378 / 16568

6400 W FOSTER AVE

1.0

03/01/97

03/01/97

0 03/01/97

03/27/97

133,900

100

Totals per TSM Install Totals per Traffic

10.0

150,000

1,802,986

194,000

1,840,382

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 427

1/1/2008 AND 12/31/2008

Ward 41 Brian G. Doherty CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Totals per Construction Phase

3,294,026

3,922,383

Totals for Ward 41

3,560,326

3,927,127

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 428

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414

ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST

300 06 0292 / 5399

ON N WABASH AVE FROM E PEARSON ST TO E CHESTNUT ST

210 06 0023 / 4298

Projects .0

02/01/06

07/31/06

0 02/01/06

07/31/06

2,446

100

1.0

11/19/04

05/18/05

1,000 11/19/04

05/18/05

0

100

N CLARK ST AND W ERIE ST

.0

02/06/02

04/02/02

0 02/06/02

04/02/02

0

0

210 06 0023 / 4298

N CLARK ST AND W SUPERIOR ST

.0

02/06/02

04/02/02

0 02/06/02

04/02/02

0

0

210 06 0207 / 4450

N COLUMBUS DR AND E ILLINOIS ST

.0

07/01/04

12/30/04

0 07/01/04

12/30/04

39

100

210 06 0207 / 4450

N FAIRBANKS CT AND E GRAND AVE

.0

07/01/04

12/30/04

0 07/01/04

12/30/04

39

100

210 06 0240 / 4477

N LA SALLE ST AND W LAKE ST

.0

10/10/05

07/31/06

1,200 10/10/05

08/08/06

235

100

210 06 0240 / 4477

N LA SALLE ST AND W RANDOLPH ST

.0

10/10/05

07/31/06

1,200 10/10/05

02/13/06

235

100

210 06 0240 / 4477

N LA SALLE ST AND W WASHINGTON ST

.0

10/10/05

07/31/06

1,500 10/10/05

02/13/06

235

100

210 06 0207 / 4450

N LOWER MICHIGAN AVE AND E GRAND AVE

.0

07/01/04

12/30/04

0 07/01/04

12/30/04

39

100

210 06 0207 / 4450

N MICHIGAN AVE AND E GRAND AVE

.0

07/01/04

12/30/04

0 07/01/04

12/30/04

39

100

210 06 0207 / 4450

N MICHIGAN AVE AND E OAK ST

.0

07/01/04

12/30/04

0 03/08/05

05/31/05

940

100

210 06 0207 / 4450

N MICHIGAN AVE AND E RANDOLPH ST

.0

07/01/04

12/30/04

0 09/02/04

09/10/04

920

100

210 06 0207 / 4450

N MICHIGAN AVE AND E WASHINGTON ST

.0

07/01/04

12/30/04

0 09/02/04

09/10/04

721

100

210 06 0207 / 4450

N PESHTIGO CT AND E GRAND AVE

.0

07/01/04

12/30/04

0 07/01/04

12/30/04

39

100

210 06 0207 / 4450

N PESHTIGO CT AND E ILLINOIS ST

.0

07/01/04

12/30/04

0 04/26/05

11/18/05

39

100

210 06 0023 / 4298

N RUSH ST AND E WALTON ST

.0

02/06/02

04/02/02

0 02/06/02

04/02/02

0

0

210 06 0207 / 4450

N ST CLAIR ST AND E GRAND AVE

.0

07/01/04

12/30/04

0 04/26/05

11/18/05

39

100

210 06 0207 / 4450

N STREETER DR AND E ILLINOIS ST

.0

07/01/04

12/30/04

0 04/26/05

11/18/05

39

100

210 06 0243 / 4480

N WABASH AVE AND E WASHINGTON ST

.0

12/27/06

01/26/07

500 12/27/06

01/26/07

1,912

100

210 06 0023 / 4298

N WELLS ST AND W HURON ST

.0

02/06/02

04/02/02

0 02/06/02

04/02/02

0

0

210 06 0207 / 4450

S MICHIGAN AVE AND E ADAMS ST

.0

07/01/04

12/30/04

500 09/02/04

09/10/04

137

100

210 06 0207 / 4450

S MICHIGAN AVE AND E JACKSON BLVD

.0

07/01/04

12/30/04

750 09/02/04

09/10/04

460

100

210 06 0207 / 4450

S MICHIGAN AVE AND E MONROE ST

.0

07/01/04

12/30/04

500 09/02/04

09/10/04

137

100

210 06 0243 / 4480

W ILLINOIS ST AND N LA SALLE DR

.0

07/07/07

07/16/07

1,135 07/14/07

07/15/07

0

0

300 06 0282 / 5390

345 E OHIO ST

1.0

12/15/04

01/10/05

2,000 12/01/04

01/03/05

1,805

100

300 06 0292 / 5399

26 E PEARSON ST

1.0

0

85

281 00 / 33670

206-232 E SUPERIOR ST

.0

01/01/08

12/31/08

300 06 0292 / 5399

300 N CANAL ST

1.0

03/30/05

05/11/05

5,000 03/30/05

05/11/05

300 06 0291 / 5398

401 N WABASH AVE

.0

10/01/04

12/31/04

54,192 10/01/04

300 06 0282 / 5390

747 N WABASH AVE

1.0

4,000 06/23/04

1,000 04/08/05 0

0

0

1,092

100

11/04/04

0

100

02/07/05

364

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 429

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0292 / 5399

330 W GRAND AVE

300 06 0292 / 5399

156 W SUPERIOR ST

Totals per Design/Engineering

Projects .0

01/20/05

12/21/05

0 01/20/05

08/05/05

0

100

1.0

02/10/05

05/26/05

3,000 02/10/05

05/26/05

0

100

6.0

77,477

11,951

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 430

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0042 / 5465

ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST

8.0

04/18/06

11/18/06

3,200

3,200

100

300 07 0042 / 5465

ON E CEDAR ST FROM N STATE ST TO N LAKE SHORE DR WEST

8.0

01/10/07

01/31/07

3,200

3,200

100

300 07 0042 / 5465

ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST

7.0

01/10/07

01/19/07

2,800

2,800

100

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W LAKE ST FROM N MILWAUKEE AVE TO N WEST WATER ST

4.0

01/10/07

01/31/07

6,000

6,000

100

300 07 0042 / 5465

ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR

2.0

01/10/07

01/31/07

800

800

100

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

Totals per 250 Watt Changeout Totals per Lighting/Electrical

29.0

16,000

16,000

3,524,651

4,193,749

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 431

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout

Fixtures

300 07 0042 / 5465

ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST

7.0

01/10/07

01/19/07

2,800

2,800

100

300 07 0042 / 5465

ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST

6.0

01/10/07

01/31/07

2,400

2,400

100

300 07 0042 / 5465

ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST

11.0

01/10/07

01/31/07

4,400

4,400

100

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST

7.0

01/10/07

01/31/07

2,800

2,800

100

300 07 0042 / 5465

ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST

5.0

01/10/07

01/31/07

1,200

1,200

100

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST

4.0

01/10/07

01/31/07

1,600

1,600

100

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

300 07 0042 / 5465

ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST

300 07 0042 / 5465 300 07 0042 / 5465

.0

03/01/06

12/31/06

0

0

0

6.50

01/10/07

01/31/07

2,600

2,600

100

ON W HUBBARD ST FROM N FRANKLIN ST TO N ORLEANS ST

7.0

01/10/07

01/31/07

2,900

2,900

100

ON W KINZIE ST FROM N ORLEANS ST TO N FRANKLIN ST

6.0

01/10/07

01/31/07

2,500

2,500

100

300 07 0042 / 5465

ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR

6.0

01/10/07

01/31/07

2,400

2,400

100

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

333 W HUBBARD ST

13.0

04/18/06

11/18/06

5,400

5,400

100

300 06 0069 / 5233

150 W OAK ST

3.0

01/27/03

01/27/03

1,200 01/24/03

1,125

100

01/24/03

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 432

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout Totals per 400 Watt Changeout

Fixtures 81.50

33,000

32,925

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 433

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0095 / 5777

ON N MICHIGAN AVE FROM E RANDOLPH ST TO E LAKE ST

2.0

500 05/31/00

05/31/00

947

100

302 00 0095 / 5777

ON W WACKER DR FROM N FRANKLIN ST TO N WELLS ST

9.0

2,000 05/29/01

05/30/01

4,154

100

302 00 0095 / 5777

70 E ADAMS ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

70 E JACKSON BLVD

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

6 E LAKE ST

1.0

302 00 0095 / 5777

30 E LAKE ST

9.0

6,750 08/01/97

08/30/97

7,732

100

302 00 0095 / 5777

67 E MADISON ST

6.0

4,500 03/31/03

04/02/03

6,640

100

302 00 0095 / 5777

71 E MADISON ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

18 N CLARK ST

3.0

2,250 10/23/02

10/29/02

1,200

100

805 06 0515 / 6701

36 N CLARK ST

1.0

0 12/20/96

12/20/96

300

100

302 00 0095 / 5777

220 N CLARK ST

4.0

3,000 10/23/02

10/29/02

1,500

100

302 00 0095 / 5777

1 N DEARBORN ST

25.0

18,750 02/24/03

02/27/03

13,892

100

805 06 1476 / 7662

1301 N DEARBORN ST

1.0

0 11/20/97

11/20/97

300

100

302 00 0095 / 5777

17 N FRANKLIN ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

18 N FRANKLIN ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

40 N FRANKLIN ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

150 N FRANKLIN ST

3.0

2,250 10/23/02

10/29/02

1,200

100

805 06 0834 / 7020

700 N FRANKLIN ST

1.0

05/24/96

05/24/96

0 05/24/96

05/24/96

300

100

805 06 0853 / 7039

720 N FRANKLIN ST

1.0

05/29/96

05/29/96

0 05/29/96

05/29/96

300

100

302 00 0095 / 5777

18 N LA SALLE ST

1.0

750 10/23/02

10/29/02

400

100

302 00 0095 / 5777

33 N LA SALLE ST

4.0

3,000 01/16/03

01/22/03

3,532

100

302 00 0095 / 5777

120 N LA SALLE ST

18.0

13,500 10/15/01

10/15/01

9,737

100

300 06 0096 / 5258

121 N LA SALLE ST

300.0

0 03/01/06

09/01/06

9,064

0

302 00 0092 / 5774

121 N LA SALLE ST

33.0

0 02/13/01

01/21/02

7,776

100

302 00 0095 / 5777

18 N MICHIGAN AVE

3.0

2,250 10/23/02

10/29/02

1,200

100

302 00 0095 / 5777

40 N MICHIGAN AVE

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

150 N MICHIGAN AVE

3.0

2,250 10/23/02

10/29/02

1,200

100

302 00 0095 / 5777

360 N MICHIGAN AVE

2.0

1,500 10/11/00

10/11/00

947

100

805 06 0449 / 6635

1300 N STATE ST

1.0

0 11/15/96

11/15/96

300

100

302 00 0095 / 5777

151 N WABASH AVE

2.0

1,500 10/23/02

10/29/02

800

100

302 00 0095 / 5777

221 N WABASH AVE

2.0

1,500 10/23/02

10/29/02

1,000

100

750

12/20/96

11/20/97

03/01/03

11/15/96

12/20/96

11/20/97

09/01/03

11/15/96

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 434

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0095 / 5777

18 N WELLS ST

3.0

2,250 10/23/02

10/29/02

1,200

100

302 00 0095 / 5777

40 N WELLS ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

150 N WELLS ST

1.0

750 10/23/02

10/29/02

400

100

302 00 0095 / 5777

221 N WELLS ST

2.0

1,500 10/23/02

10/29/02

1,000

100

302 00 0095 / 5777

135 S LA SALLE ST

4.0

3,000 06/02/99

06/04/99

3,605

100

302 00 0095 / 5777

18 S MICHIGAN AVE

26.0

19,500 02/28/03

03/12/03

23,681

100

300 06 0078 / 5241

122 S MICHIGAN AVE

17.0

12/23/02

12/31/02

15,700 12/23/02

12/31/02

15,694

100

300 06 0225 / 5340

220 S MICHIGAN AVE

4.0

12/18/02

12/20/02

7,750 12/18/02

12/20/02

7,740

100

300 06 0078 / 5241

211 S STATE ST

14.0

10/29/02

11/06/02

14,850 10/29/02

11/06/02

14,831

100

300 06 0225 / 5340

211 S STATE ST

8.0

10/30/02

10/31/02

6,341 10/30/02

10/31/02

6,340

100

302 00 0095 / 5777

30 S WABASH AVE

5.0

3,750 03/13/03

03/14/03

5,129

100

805 06 0697 / 6883

58 W ERIE ST

1.0

0 11/06/96

11/06/96

300

100

302 00 0092 / 5774

501 W HURON ST

1.0

0 01/17/02

01/17/02

236

100

302 00 0095 / 5777

50 W LAKE ST

4.0

3,000 07/21/97

08/08/97

2,986

100

302 00 0095 / 5777

40-42 W MARBLE PL

15.0

11,250 03/17/03

03/28/03

12,754

100

302 00 0095 / 5777

22 W MONROE ST

12.0

9,000 12/16/97

12/26/97

10,237

100

805 06 0607 / 6793

63 W ONTARIO ST

1.0

0 11/29/96

11/29/96

300

100

302 00 0095 / 5777

190 W RANDOLPH ST

4.0

3,000 07/21/97

08/08/97

2,986

100

302 00 0095 / 5777

205 W RANDOLPH ST

4.0

3,000 03/23/00

03/24/00

1,926

100

300 06 0166 / 5305

4-36 W TOOKER PL

5.0

1,679 04/01/00

04/21/00

1,678

100

302 00 0095 / 5777

41 W WACKER DR

3.0

2,250 10/23/02

10/29/02

1,200

100

805 06 1798 / 7984

60 W WALTON ST

1.0

04/10/97

04/10/97

0 04/10/97

04/10/97

300

100

302 00 0095 / 5777

69 W WASHINGTON ST

11.0

12/06/02

12/11/02

8,250 12/06/02

12/11/02

10,477

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

121 N LA SALLE ST

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

121 N LA SALLE ST

11/06/96

11/29/96

04/01/00

11/06/96

11/29/96

04/21/00

597.0

195,820

207,421

Lamps 3,803.0

06/01/07

12/31/07

111,960 07/01/07

01/01/08

108,575

100

0 11/01/02

12/31/02

65,690

100

Installations 2,165.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 435

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N PARK DR FROM E NORTH WATER ST TO E ILLINOIS ST

2.0

01/10/07

01/31/07

1,000

1,000

100

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W MADISON ST FROM WACKER DR TO CANAL ST

1.0

01/10/07

01/31/07

500

500

100

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W WASHINGTON ST FROM N WACKER DR TO N RIVERSIDE PLZ

2.0

01/10/07

01/31/07

1,000

100

100

302 00 0092 / 5774

12 W WASHINGTON ST

2.0

0 07/09/01

07/09/01

941

100

302 00 0092 / 5774

26 W WASHINGTON ST

2.0

0 07/09/01

07/09/01

941

100

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

206-232 E SUPERIOR ST

9.0

2,500

3,482

0

0

Blocks .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 436

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0282 / 5390

345 E OHIO ST

281 00 / 33670

206-232 E SUPERIOR ST

300 06 0292 / 5399

Installations 1.0

01/14/05

01/16/05

.0

01/01/08

12/31/08

300 N CANAL ST

1.0

09/01/05

300 06 0282 / 5390

747 N WABASH AVE

1.0

81,000 12/01/04

300 06 0292 / 5399

330 W GRAND AVE

1.0

45,000 08/01/05

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts

8,000 01/14/05

01/16/05

0

100

0

0

48,836

100

09/13/05

68,596

100

10/14/05

38,546

100

48,415 12/28/06

4.0

6,662

182,415

162,640

Projects

300 06 0199 / 5324

ON N WABASH AVE FROM E CHESTNUT ST TO E DELAWARE PL

1.0

32,573 10/04/99

11/10/99

24,412

100

150 06 0068 / 2139

ON W WACKER DR FROM N STATE ST TO N WELLS ST

1.0

0 11/15/98

12/31/99

17,879

100

300 06 0292 / 5399

156 W SUPERIOR ST

0 06/17/05

06/09/06

0

100

Totals per Lighting Imprvmnts

Work Type: Loop Lighting 281 00 / 33670

206-232 E SUPERIOR ST

.0

03/01/05

12/31/05

2.0

32,573

42,291

0

0

Blocks .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 437

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting

Fixtures

300 11 / 32231

ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL

25.0

03/08/08

03/08/08

38,636

100

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 06 0122 / 5275

ON W NORTH AVE FROM N WELLS ST TO N CLARK ST

4.55

08/20/03

08/25/03

5,670 08/19/03

08/25/03

5,267

100

300 06 0122 / 5275

ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY

6.50

08/20/03

08/25/03

8,100 08/19/03

08/22/03

15,048

100

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

333 W HUBBARD ST

7.0

04/18/06

11/18/06

9,450

9,450

100

56,970

68,401

Totals per Ornamental - Piggyback Lighting

43.05

33,750 07/09/08

07/09/08

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 438

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting

Blocks

300 06 0188 / 5313

ON E CHESTNUT ST FROM N RUSH ST TO N WABASH AVE

.50

06/01/02

12/01/02

69,500 05/28/02

12/27/02

49,622

100

300 06 0188 / 5313

ON E PEARSON ST FROM N RUSH ST TO N WABASH AVE

.50

06/01/02

12/01/02

69,500 05/28/02

12/27/02

49,622

100

300 06 0132 / 5285

ON N FRANKLIN ST FROM W HURON ST TO W CHICAGO AVE

1.0

125,000 05/01/00

05/19/00

49,188

100

300 06 0073 / 5236

ON N RUSH ST FROM E CHESTNUT ST TO E CEDAR ST

3.0

08/03/98

09/28/01

1,700,000 08/03/98

05/20/02

1,173,525

100

300 06 0188 / 5313

ON N RUSH ST FROM E CHESTNUT ST TO E PEARSON ST

.50

06/01/02

12/01/02

69,500 05/28/02

12/27/02

49,622

100

300 06 0188 / 5313

ON N WABASH AVE FROM E CHESTNUT ST TO E PEARSON ST

.50

06/01/02

12/01/02

69,500 05/28/02

12/27/02

49,623

100

302 00 0043 / 5753

ON W WACKER DR FROM N STATE ST TO N FRANKLIN ST

300 11 / 32231

N DEARBORN PKWY AND W NORTH BLVD

1.0

03/08/08

07/09/08

36,000 03/08/08

07/09/08

38,636

100

300 11 / 32231

N DEARBORN ST AND W GOETHE ST

1.0

03/08/08

07/09/08

30,000 03/08/08

07/09/08

38,636

100

300 11 / 32231

W BURTON PL AND N DEARBORN ST

1.0

03/08/08

07/09/08

36,000 03/08/08

07/09/08

38,636

100

281 00 / 33670

206-232 E SUPERIOR ST

.0

01/01/08

12/31/08

0

0

0

2,205,000

1,537,110

Totals per Ornamental Lighting

Work Type: POD Camera Pole 281 00 / 33670

206-232 E SUPERIOR ST

Work Type: Residential Regrouping 300 06 0270 / 5378

311 W SUPERIOR ST

Work Type: Residntl Staggered Lighting

0

3.50

12.50

0

Poles .0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Lamps .0

Blocks

300 06 0298 / 5405

ON N DEARBORN ST FROM W CHICAGO AVE TO W OAK ST

2.0

11/01/05

12/15/05

0 10/10/05

11/18/05

144,313

100

300 06 0308 / 5414

ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST

2.0

03/16/06

12/31/06

209,566 10/06/06

11/17/06

135,535

100

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

4.0

209,566

279,848

Blocks

300 06 0166 / 5305

ON W CHESTNUT ST FROM N STATE ST TO N DEARBORN ST

.50

04/01/00

04/21/00

1,679 04/01/00

04/21/00

1,678

100

300 06 0235 / 5349

ON W OAK ST FROM N LA SALLE ST TO N DEARBORN ST

2.0

09/15/03

10/30/03

85,094 08/18/03

10/17/03

146,995

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

206-232 E SUPERIOR ST

2.50

86,773

148,673

0

0

Locations .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 439

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl 281 00 / 33670

206-232 E SUPERIOR ST

Locations .0

01/01/08

12/31/08

0

0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 440

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 06 0081 / 5244

ON E ADAMS ST FROM S STATE ST TO S MICHIGAN AVE

27.0

05/02/98

05/03/98

1,715 05/02/98

05/03/98

1,715

100

300 07 0042 / 5465

ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST

8.0

04/18/06

11/18/06

1,600 04/18/06

11/18/06

1,600

100

300 07 0042 / 5465

ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST

7.0

04/18/06

11/18/06

1,750 08/14/06

09/01/06

1,382

100

300 06 0081 / 5244

ON E MADISON ST FROM S STATE ST TO N MICHIGAN AVE

20.0

0 05/09/98

05/10/98

1,270

100

300 06 0081 / 5244

ON E MONROE ST FROM S STATE ST TO S MICHIGAN AVE

20.0

0 05/09/98

05/10/98

1,270

100

300 06 0081 / 5244

ON E WASHINGTON ST FROM N STATE ST TO N MICHIGAN AVE

20.0

0 05/16/98

05/17/98

1,270

100

300 07 0042 / 5465

ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST

300 11 / 32231

6.0

04/18/06

11/18/06

1,500 08/14/06

09/01/06

1,185

100

ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL

25.0

03/08/08

07/09/08

7,500 03/08/08

07/09/08

5,000

100

300 07 0042 / 5465

ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST

11.0

04/18/06

11/18/06

2,750 08/14/06

09/01/06

2,172

100

302 00 0076 / 5764

ON N DEARBORN ST FROM W MADISON ST TO W WACKER DR

48.0

09/01/00

12/31/00

0

816

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0043 / 5466

ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE

14.50

04/18/06

11/18/06

3,625 08/04/06

09/01/06

0

100

300 07 0042 / 5465

ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST

7.0

04/18/06

11/18/06

1,750 08/14/06

09/01/06

1,381

100

300 07 0042 / 5465

ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST

3.0

04/18/06

01/31/07

600 08/14/06

09/01/06

592

100

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

300 06 0081 / 5244

ON N ORLEANS ST FROM W HUBBARD ST TO W CHICAGO AVE

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

302 00 0076 / 5764

ON N RUSH ST FROM E SUPERIOR ST TO E CHICAGO AVE

4.0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

300 06 0081 / 5244

ON N STATE ST FROM E MADISON ST TO W WACKER DR

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

4,505

100

0

0

0

0

0

0

12/31/06

0

0

0

09/01/00

12/31/00

0

68

03/01/06

12/31/06

0

70.0

0 0 05/12/98

4.0

05/17/98

0

0

254

100

0

0

0

0

0

0

0

0

0

0 05/23/98

05/23/98

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 441

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 06 0081 / 5244

ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST

300 06 0081 / 5244 300 06 0081 / 5244 300 06 0081 / 5244

ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE

300 06 0081 / 5244

0

37.0

0 05/17/98

05/23/98

2,350

100

ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST

23.50

0 05/13/98

05/16/98

1,493

100

ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY

4.0

0 05/23/98

05/23/98

254

100

55.90

0 05/08/98

05/17/98

3,598

100

ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY

4.80

0 05/23/98

05/23/98

305

100

300 06 0081 / 5244

ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST

50.0

0 04/25/98

05/03/98

3,175

100

300 06 0081 / 5244

ON W CHICAGO AVE FROM N DEARBORN ST TO N LA SALLE DR

12.0

0 05/23/98

05/23/98

762

100

300 03 0042 / 4913

ON W DELAWARE PL FROM N CLARK ST TO N LA SALLE DR

300 07 0042 / 5465 300 06 0081 / 5244 300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

300 07 0042 / 5465

3.0

03/01/05

03/01/05

ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST

4.0

04/18/06

11/18/06

ON W ERIE ST FROM N LA SALLE DR TO N ORLEANS ST

15.0 .0

03/01/06

12/31/06

ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST

6.50

04/18/06

11/18/06

300 06 0081 / 5244

ON W HUBBARD ST FROM N STATE ST TO N WELLS ST

300 06 0081 / 5244

ON W HURON ST FROM N LA SALLE DR TO N ORLEANS ST

300 06 0081 / 5244

ON W KINZIE ST FROM N STATE ST TO N WELLS ST

300 06 0081 / 5244

ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST

300 07 0042 / 5465

ON W MADISON ST FROM WACKER DR TO CANAL ST

2.0

04/18/06

300 07 0042 / 5465

ON W MAPLE ST FROM N STATE ST TO N DEARBORN ST

2.0

300 07 0042 / 5465

ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR

6.0

300 06 0081 / 5244

ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST

45.0

300 06 0108 / 5263

ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST

8.50

07/01/03

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

300 06 0081 / 5244

ON W SUPERIOR ST FROM N LA SALLE DR TO N ORLEANS ST

300 06 0081 / 5244 300 06 0081 / 5244

600

0

1,000 08/14/06

09/01/06

791

100

0 05/17/98

05/17/98

952

100

0

0

0

1,625 08/14/06

09/01/06

1,283

100

23.0

0 05/16/98

05/17/98

1,461

100

13.0

0 05/17/98

05/17/98

825

100

22.0

0 05/16/98

05/17/98

1,397

100

44.50

0 05/04/98

05/10/98

2,826

100

11/18/06

500 08/14/06

09/01/06

395

100

04/18/06

11/18/06

400 08/14/06

09/01/06

395

100

04/18/06

11/18/06

1,500 08/14/06

09/01/06

1,185

100

0 05/04/98

05/10/98

2,858

100

07/07/03

2,000 06/20/03

06/30/03

1,925

100

12/31/06

0 03/01/06

12/31/06

0

0

11.0

0 05/17/98

05/17/98

698

100

44 E ONTARIO ST

5.0

0 05/22/98

05/22/98

317

100

65 E ONTARIO ST

5.0

0 05/23/98

05/23/98

317

100

300 06 0081 / 5244

200 E ONTARIO ST

22.0

0 05/21/98

05/22/98

1,397

100

300 06 0081 / 5244

300 E ONTARIO ST

7.0

0 05/22/98

05/22/98

444

100

302 00 0076 / 5764

400-430 N LA SALLE ST

4.0

09/01/00

12/31/00

300 07 0042 / 5465

333 W HUBBARD ST

9.0

04/18/06

11/18/06

0 2,250 04/18/06

68 11/18/06

2,250

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 442

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0081 / 5244

1-630 W WASHINGTON BLVD

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670

206-232 E SUPERIOR ST

Work Type: Strt Lighting 302 00 0071 / 5759

ON W LAKE ST FROM N WELLS ST TO N FRANKLIN ST

300 06 0117 / 5271

ON W WACKER DR FROM N STATE ST TO N ORLEANS ST

300 06 0291 / 5398

401 N WABASH AVE

303 00 0006 / 5783

540 W LAKE ST

90.0

0 05/02/98

831.20

Work Type: Traffic Signal Regrouping 121 N LA SALLE ST

05/17/98

5,715

33,315

64,309

0

0

0

247,621

100

Blocks .0

01/01/08

12/31/08

0

Blocks 30,000 .0

24,000

12/01/04

02/28/05

67,142 01/03/05

03/22/05

60,640

100

08/01/97

12/01/97

60,000 08/01/97

04/30/98

76,547

100

.0

Totals per Strt Lighting

300 06 0139 / 5289

Locations

157,142

408,808

Lamps 945.0

03/01/04

12/01/04

4,914 10/27/06

11/27/06

10,291

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 443

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0073 / 5761

ON E HUBBARD ST FROM N RUSH ST TO N WABASH AVE

302 00 0073 / 5761

ON N WABASH AVE FROM E WACKER DR TO E GRAND AVE

805 06 2255 / 8441

44 E ADAMS ST

805 06 2649 / 8835

Fixtures 22.0

06/01/00

10/31/01

76,562 07/19/01

15,742

100

171.0

06/01/00

10/31/01

76,564 04/16/01

122,366

100

4.0

12/31/93

12/31/93

0 12/31/93

12/31/93

3,000

100

134 E GRAND AVE

28.0

01/01/92

01/01/92

0 01/01/92

01/01/92

21,000

100

805 06 2627 / 8813

498 E GRAND AVE

32.0

01/01/93

01/01/93

0 01/01/93

01/01/93

24,000

100

805 06 2578 / 8764

134 E ILLINOIS ST

28.0

01/01/92

01/01/92

0 01/01/92

01/01/92

21,000

100

805 06 2402 / 8588

520 E ILLINOIS ST

32.0

01/01/92

01/01/92

0 01/01/92

01/01/92

24,000

100

300 06 0207 / 5330

150 N COLUMBUS DR

66.0

805 06 2927 / 9113

435 N DESPLAINES ST

14.0

302 00 0070 / 5758 302 00 0070 / 5758 805 06 2119 / 8305

600 N KINGSBURY ST

300 06 0217 / 5337

121 N LA SALLE ST

302 00 0072 / 5760

220 N MILWAUKEE AVE

1.0

805 06 2906 / 9092

220 N MILWAUKEE AVE

18.0

302 00 0070 / 5758

1 S STATE ST

805 06 2278 / 8464

201 W ADAMS ST

4.0

12/31/93

12/31/93

0 12/31/93

12/31/93

3,000

100

805 06 2903 / 9089

501 W FULTON ST

16.0

02/22/94

02/22/94

0 02/22/94

02/22/94

12,000

100

805 06 2902 / 9088

628 W HUBBARD ST

24.0

12/01/93

12/01/93

0 12/01/93

12/01/93

18,000

100

805 06 2275 / 8461

405 W KINZIE ST

12.0

12/31/94

12/31/94

0 12/31/94

12/31/94

9,000

100

805 06 2276 / 8462

405 W KINZIE ST

12.0

12/31/94

12/31/94

0 12/31/94

12/31/94

9,000

100

805 06 2904 / 9090

534 W KINZIE ST

23.0

11/17/93

11/17/93

0 11/17/93

11/17/93

17,250

100

805 06 2235 / 8421

501 W LAKE ST

42.0

04/17/96

04/17/96

0 04/17/96

04/17/96

31,500

100

805 06 2855 / 9041

505 W RANDOLPH ST

42.0

01/30/93

01/30/93

0 01/30/93

01/30/93

31,500

100

805 06 2246 / 8432

505 W WASHINGTON BLVD

98.0

05/19/96

05/19/96

0 05/19/96

05/19/96

73,500

100

0 10/25/01 12/01/93

95

10,500

100

0 12/01/93

12/01/93

320 N JEFFERSON ST

0 12/31/97

01/06/98

6,439

100

600 N KINGSBURY ST

0 06/24/97

07/02/97

10,451

100

Totals per Underpass Lighting

12/01/93

59,080

17.0

07/02/97

07/02/97

0 07/02/97

07/02/97

12,750

100

544.0

06/07/04

06/14/04

30,577 07/26/04

08/09/04

10,880

100

0 10/28/99

12/29/99

23,017

100

0 07/29/94

07/29/94

13,500

100

07/29/94

07/29/94

0

1,250.0

183,703

441,811

1,024,286

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 444

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Locations

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W FULTON ST FROM N CANAL ST TO N CLINTON ST

6.0

04/18/06

11/18/06

6,000

6,000

100

300 07 0042 / 5465

ON W KINZIE ST FROM N CANAL ST TO N CLINTON ST

7.0

04/18/06

11/18/06

7,000

7,000

100

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

13,000

13,000

Totals per Underpass Lighting

13.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 445

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

E GRAND AVE AND N WABASH AVE

1.0

210 06 0175 / 4423

E ILLINOIS ST AND N STREETER DR

1.0

210 06 0130 / 4389

E MONROE ST AND S WABASH AVE

210 06 0130 / 4389

0 11/04/02

11/04/02

7,324

100

10,000 04/03/03

04/03/03

10,663

100

1.0

0 10/03/01

10/03/01

7,552

100

E ONTARIO ST AND N WABASH AVE

1.0

0 09/04/02

09/04/02

7,324

100

210 06 0130 / 4389

N CLARK ST AND W CHICAGO AVE

1.0

0 04/08/02

04/08/02

8,091

100

210 06 0130 / 4389

N CLARK ST AND W GRAND AVE

1.0

0 11/11/01

11/11/01

6,108

100

210 06 0130 / 4389

N CLARK ST AND W HUBBARD ST

1.0

0 11/11/01

11/11/01

3,677

100

210 06 0130 / 4389

N CLARK ST AND W HURON ST

1.0

0 11/08/01

11/08/01

7,324

100

210 06 0130 / 4389

N CLARK ST AND W ILLINOIS ST

1.0

0 11/11/01

11/11/01

6,108

100

210 06 0130 / 4389

N CLARK ST AND W KINZIE ST

1.0

0 11/12/01

11/12/01

7,324

100

210 06 0130 / 4389

N CLARK ST AND W LAKE ST

1.0

0 10/21/01

10/21/01

7,324

100

210 06 0130 / 4389

N CLARK ST AND W OHIO ST

1.0

0 11/11/01

11/11/01

7,552

100

210 06 0130 / 4389

N CLARK ST AND W ONTARIO ST

1.0

0 11/08/01

11/08/01

6,108

100

210 06 0130 / 4389

N CLARK ST AND W RANDOLPH ST

1.0

0 10/11/01

10/11/01

6,108

100

210 06 0130 / 4389

N CLARK ST AND W WASHINGTON ST

1.0

0 09/17/01

09/17/01

6,108

100

210 06 0130 / 4389

N CLINTON ST AND W LAKE ST

1.0

0 11/21/01

11/21/01

8,134

100

210 06 0175 / 4423

N COLUMBUS DR AND E NORTH WATER ST

1.0

16,000 12/30/03

12/31/03

13,613

100

210 06 0130 / 4389

N DEARBORN ST AND W ERIE ST

1.0

0 11/13/01

11/13/01

3,522

100

210 06 0130 / 4389

N DEARBORN ST AND W GRAND AVE

1.0

0 11/13/01

11/13/01

6,108

100

210 06 0130 / 4389

N DEARBORN ST AND W HURON ST

1.0

0 11/13/01

11/13/01

6,108

100

210 06 0130 / 4389

N DEARBORN ST AND W ILLINOIS ST

1.0

0 11/13/01

11/13/01

6,108

100

210 06 0130 / 4389

N DEARBORN ST AND W KINZIE ST

1.0

0 11/13/01

11/13/01

7,324

100

210 06 0130 / 4389

N DEARBORN ST AND W LAKE ST

1.0

0 10/21/01

10/21/01

9,367

100

210 06 0130 / 4389

N DEARBORN ST AND W OHIO ST

1.0

0 11/14/01

07/25/02

5,423

90

210 06 0130 / 4389

N DEARBORN ST AND W ONTARIO ST

1.0

0 11/14/01

11/14/01

5,651

100

210 06 0130 / 4389

N DEARBORN ST AND W RANDOLPH ST

1.0

0 10/11/01

10/11/01

6,285

100

210 06 0130 / 4389

N DEARBORN ST AND W SUPERIOR ST

1.0

0 11/14/01

11/14/01

3,065

100

210 06 0130 / 4389

N DEARBORN ST AND W WASHINGTON ST

1.0

0 09/18/01

09/18/01

6,513

100

210 06 0130 / 4389

N FAIRBANKS CT AND E GRAND AVE

1.0

0 10/31/01

10/31/01

4,384

90

210 06 0175 / 4423

N FAIRBANKS CT AND E OHIO ST

1.0

01/02/04

01/02/04

12,000 01/08/04

01/08/04

13,958

100

210 06 0175 / 4423

N FAIRBANKS CT AND E ONTARIO ST

1.0

01/03/04

01/03/04

10,000 01/07/04

01/07/04

13,392

100

04/03/03

01/01/04

05/03/03

01/01/04

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 446

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N FRANKLIN ST AND W GRAND AVE

1.0

0 05/23/02

05/23/02

10,160

100

210 06 0130 / 4389

N FRANKLIN ST AND W LAKE ST

1.0

0 10/16/01

10/16/01

5,880

100

210 06 0130 / 4389

N FRANKLIN ST AND W OHIO ST

1.0

0 05/28/02

05/28/02

3,117

100

210 06 0130 / 4389

N FRANKLIN ST AND W ONTARIO ST

1.0

0 05/29/02

05/29/02

6,638

100

210 06 0130 / 4389

N FRANKLIN ST AND W RANDOLPH ST

1.0

0 10/15/01

10/15/01

6,513

100

210 06 0130 / 4389

N FRANKLIN ST AND W WASHINGTON ST

1.0

0 09/16/01

09/16/01

6,108

100

210 06 0175 / 4423

N KINGSBURY ST AND W GRAND AVE

1.0

12,000 12/22/03

12/22/03

13,096

100

210 06 0130 / 4389

N LA SALLE ST AND W CHICAGO AVE

1.0

0 04/09/02

04/09/02

9,349

100

210 06 0130 / 4389

N LA SALLE ST AND W ERIE ST

1.0

0 11/07/01

11/07/01

8,539

100

210 06 0130 / 4389

N LA SALLE ST AND W GRAND AVE

1.0

0 11/06/01

11/06/01

8,496

100

210 06 0130 / 4389

N LA SALLE ST AND W HUBBARD ST

1.0

0 11/05/01

11/05/01

8,539

100

210 06 0130 / 4389

N LA SALLE ST AND W HURON ST

1.0

0 11/07/01

11/07/01

7,324

100

210 06 0130 / 4389

N LA SALLE ST AND W ILLINOIS ST

1.0

0 11/06/01

11/06/01

5,246

100

210 06 0130 / 4389

N LA SALLE ST AND W LAKE ST

1.0

0 10/18/01

10/18/01

8,539

100

210 06 0130 / 4389

N LA SALLE ST AND W OHIO ST

1.0

0 11/06/01

06/12/02

9,711

100

210 06 0130 / 4389

N LA SALLE ST AND W ONTARIO ST

1.0

0 06/13/02

06/13/02

6,190

100

210 06 0130 / 4389

N LA SALLE ST AND W RANDOLPH ST

1.0

0 10/11/01

10/11/01

7,729

100

210 06 0130 / 4389

N LA SALLE ST AND W SUPERIOR ST

1.0

0 11/07/01

11/07/01

7,729

100

210 06 0130 / 4389

N LA SALLE ST AND W WASHINGTON ST

1.0

0 09/17/01

09/17/01

7,729

100

210 06 0175 / 4423

N MCCLURG CT AND E OHIO ST

1.0

01/10/04

01/10/04

11,000 12/30/03

12/31/03

9,560

100

210 06 0175 / 4423

N MCCLURG CT AND E ONTARIO ST

1.0

01/02/04

01/02/04

10,000 12/30/03

12/31/03

9,921

100

210 06 0130 / 4389

N MICHIGAN AVE AND E CHICAGO AVE

1.0

0 04/01/02

04/01/02

13,397

100

210 06 0175 / 4423

N MICHIGAN AVE AND E ERIE ST

1.0

06/11/03

06/12/03

14,000 05/28/03

05/29/03

15,066

100

210 06 0175 / 4423

N MICHIGAN AVE AND E GRAND AVE

2.0

06/19/03

01/03/04

24,000 05/08/03

01/23/04

23,372

100

210 06 0175 / 4423

N MICHIGAN AVE AND E HURON ST

1.0

06/09/03

06/10/03

16,000 05/30/03

05/30/03

14,205

100

210 06 0175 / 4423

N MICHIGAN AVE AND E ILLINOIS ST

1.0

06/20/03

06/23/03

11,000 05/09/03

05/12/03

12,402

100

210 06 0130 / 4389

N MICHIGAN AVE AND E LAKE ST

1.0

0 10/23/01

10/23/01

12,522

100

210 06 0175 / 4423

N MICHIGAN AVE AND E OHIO ST

1.0

06/17/03

06/18/03

15,000 05/13/03

05/15/03

15,650

100

210 06 0175 / 4423

N MICHIGAN AVE AND E ONTARIO ST

1.0

06/13/03

06/16/03

16,000 05/16/03

05/19/03

16,126

100

210 06 0130 / 4389

N MICHIGAN AVE AND E RANDOLPH ST

1.0

0 10/16/01

10/16/01

15,069

100

210 06 0175 / 4423

N MICHIGAN AVE AND E SUPERIOR ST

1.0

15,000 06/02/03

06/05/03

16,936

100

01/04/04

06/05/03

01/04/04

06/06/03

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 447

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N MICHIGAN AVE AND E WASHINGTON ST

1.0

0 09/20/01

09/20/01

8,944

100

210 06 0130 / 4389

N ORLEANS ST AND W CHICAGO AVE

.50

0 04/12/02

04/12/02

3,953

100

210 06 0130 / 4389

N ORLEANS ST AND W GRAND AVE

1.0

0 05/13/02

05/13/02

9,306

100

210 06 0130 / 4389

N ORLEANS ST AND W HURON ST

1.0

0 10/30/01

10/30/01

5,953

100

210 06 0130 / 4389

N ORLEANS ST AND W ILLINOIS ST

1.0

0 05/10/02

05/10/02

8,082

100

210 06 0130 / 4389

N ORLEANS ST AND W MERCHANDISE MART PLZ

1.0

0 04/12/02

04/12/02

6,513

100

210 06 0130 / 4389

N ORLEANS ST AND W OHIO ST

1.0

0 05/13/02

05/13/02

5,195

100

210 06 0130 / 4389

N ORLEANS ST AND W SUPERIOR ST

1.0

0 05/02/02

05/02/02

9,806

100

210 06 0175 / 4423

N PESHTIGO CT AND E GRAND AVE

1.0

01/05/04

01/05/04

14,000 01/14/04

01/14/04

10,966

100

210 06 0175 / 4423

N PESHTIGO CT AND E ILLINOIS ST

1.0

06/04/03

06/05/03

9,000 06/12/03

06/12/03

7,032

100

210 06 0175 / 4423

N RUSH ST AND E GRAND AVE

1.0

04/18/03

04/21/03

12,000 04/18/03

04/21/03

13,022

100

210 06 0175 / 4423

N RUSH ST AND E ILLINOIS ST

1.0

04/22/03

04/23/03

12,000 04/22/03

04/23/03

13,251

100

210 06 0175 / 4423

N RUSH ST AND E OHIO ST

1.0

04/24/03

04/25/03

10,000 04/24/03

04/25/03

10,977

100

210 06 0175 / 4423

N RUSH ST AND E ONTARIO ST

1.0

04/25/03

04/28/03

10,000 04/25/03

04/28/03

10,977

100

210 06 0175 / 4423

N ST CLAIR ST AND E GRAND AVE

1.0

04/29/03

04/29/03

10,000 04/29/03

04/29/03

11,135

100

210 06 0175 / 4423

N ST CLAIR ST AND E HURON ST

1.0

04/30/03

05/01/03

12,000 05/01/03

05/01/03

13,251

100

210 06 0175 / 4423

N ST CLAIR ST AND E OHIO ST

1.0

01/07/04

01/07/04

14,000 12/23/03

12/23/03

12,086

100

210 06 0175 / 4423

N ST CLAIR ST AND E ONTARIO ST

1.0

01/08/04

01/08/04

16,000 12/31/03

12/31/03

11,320

100

210 06 0130 / 4389

N STATE ST AND E BELLEVUE PL

1.0

0 05/02/02

05/02/02

8,539

100

210 06 0175 / 4423

N STREETER DR AND E ILLINOIS ST

1.0

11,000 04/11/03

04/14/03

12,353

100

210 06 0130 / 4389

N WABASH AVE AND E CHICAGO AVE

1.0

0 04/04/02

04/04/02

8,539

100

210 06 0130 / 4389

N WABASH AVE AND E LAKE ST

1.0

0 10/23/01

10/23/01

6,513

100

210 06 0130 / 4389

N WABASH AVE AND E NORTH WATER ST

1.0

0 11/04/02

11/04/02

7,625

100

210 06 0130 / 4389

N WABASH AVE AND E RANDOLPH ST

1.0

0 10/14/01

10/14/01

10,970

100

210 06 0130 / 4389

N WABASH AVE AND E WASHINGTON ST

1.0

0 09/19/01

09/19/01

6,918

100

210 06 0130 / 4389

N WELLS ST AND W CHICAGO AVE

.50

0 04/10/02

04/10/02

4,270

100

210 06 0130 / 4389

N WELLS ST AND W GRAND AVE

1.0

0 11/01/01

11/01/01

7,324

100

210 06 0130 / 4389

N WELLS ST AND W HUBBARD ST

1.0

0 11/01/01

11/01/01

7,095

100

210 06 0130 / 4389

N WELLS ST AND W ILLINOIS ST

1.0

0 11/01/01

11/01/01

6,108

100

210 06 0130 / 4389

N WELLS ST AND W KINZIE ST

1.0

0 11/01/01

11/01/01

8,539

100

210 06 0130 / 4389

N WELLS ST AND W LAKE ST

1.0

0 10/17/01

10/17/01

7,677

100

04/11/03

04/14/03

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 448

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N WELLS ST AND W OHIO ST

1.0

0 05/30/02

05/30/02

3,751

100

210 06 0130 / 4389

N WELLS ST AND W ONTARIO ST

1.0

0 11/05/01

11/05/01

4,893

100

210 06 0130 / 4389

N WELLS ST AND W RANDOLPH ST

1.0

0 10/16/01

10/16/01

7,324

100

210 06 0130 / 4389

N WELLS ST AND W WASHINGTON ST

1.0

0 09/17/01

09/17/01

6,513

100

210 06 0130 / 4389

S CLARK ST AND W ADAMS ST

1.0

0 10/02/01

10/02/01

6,513

100

210 06 0130 / 4389

S CLARK ST AND W JACKSON BLVD

.50

0 10/09/01

10/09/01

3,257

100

210 06 0130 / 4389

S COLUMBUS DR AND E BALBO AVE

.50

0 02/06/02

02/06/02

6,231

100

210 06 0130 / 4389

S COLUMBUS DR AND E CONGRESS DR

.50

0 03/06/02

03/06/02

4,728

100

210 06 0130 / 4389

S COLUMBUS DR AND E JACKSON BLVD

.50

0 01/17/02

01/17/02

4,856

100

210 06 0130 / 4389

S COLUMBUS DR AND E MONROE ST

1.0

0 01/16/02

01/16/02

13,229

100

210 06 0130 / 4389

S DEARBORN ST AND W ADAMS ST

1.0

0 04/05/02

04/05/02

8,901

100

210 06 0130 / 4389

S DEARBORN ST AND W JACKSON BLVD

.50

0 10/09/01

10/09/01

3,257

100

210 06 0130 / 4389

S DEARBORN ST AND W MONROE ST

1.0

0 09/26/01

09/26/01

6,918

100

210 06 0130 / 4389

S LA SALLE ST AND W ADAMS ST

1.0

0 10/02/01

10/02/01

7,324

100

210 06 0130 / 4389

S LA SALLE ST AND W MONROE ST

1.0

0 09/26/01

09/26/01

7,095

100

210 06 0130 / 4389

S MICHIGAN AVE AND E JACKSON BLVD

.50

0 11/04/02

11/04/02

5,132

100

210 06 0130 / 4389

S MICHIGAN AVE AND E MONROE ST

1.0

0 09/27/01

09/27/01

11,478

100

210 06 0130 / 4389

S STATE ST AND W MADISON ST

1.0

0 09/21/01

09/21/01

7,324

100

210 06 0130 / 4389

S WABASH AVE AND E ADAMS ST

1.0

0 10/03/01

10/03/01

6,513

100

210 06 0130 / 4389

S WABASH AVE AND E JACKSON BLVD

.50

0 10/09/01

10/09/01

2,395

100

210 06 0130 / 4389

S WELLS ST AND W ADAMS ST

.50

0 10/04/01

10/04/01

3,459

100

210 06 0130 / 4389

S WELLS ST AND W JACKSON BLVD

.50

0 10/10/01

10/10/01

2,940

100

210 06 0130 / 4389

S WELLS ST AND W MONROE ST

.50

0 10/04/01

10/04/01

3,662

100

210 06 0130 / 4389

320 N CLARK ST

1.0

0 11/21/01

11/21/01

3,927

100

Totals per LED Signal Head Install Totals per Traffic

112.0

322,000

960,363

3,487,726

5,843,683

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 449

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow

Locations

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

N FAIRBANKS CT AND E GRAND AVE

1.0

04/18/06

11/18/06

5,000

5,000

100

210 06 0021 / 4296

W GRAND AVE AND N KINGSBURY ST

1.0

01/31/02

05/03/02

10,543

100

Totals per Left Turn Arrow

Work Type: New Signal

2.0

60,000 11/17/01

11/17/01

65,000

15,543

Locations

210 06 0022 / 4297

N CLARK ST AND W SUPERIOR ST

1.0

210 06 0189 / 4434

1 N WACKER DR

1.0

44,000

0

2.0

59,000

14,868

Totals per New Signal

06/01/02

12/31/02

15,000 11/20/02

01/08/03

14,868

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 450

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install

Locations

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

210 06 0207 / 4450

N COLUMBUS DR AND E ILLINOIS ST

1.0

08/15/05

11/15/05

5,792

100

300 07 0042 / 5465

N DEARBORN ST AND W OAK ST

1.0

04/18/06

11/18/06

24,000

100

210 06 0207 / 4450

N FAIRBANKS CT AND E GRAND AVE

1.0

08/15/05

11/15/05

8,800 10/06/05

10/19/05

5,792

100

210 06 0240 / 4477

N LA SALLE ST AND W LAKE ST

8.0

05/01/06

06/01/06

12,500 08/24/06

08/24/06

6,155

100

210 06 0240 / 4477

N LA SALLE ST AND W RANDOLPH ST

8.0

05/01/06

06/01/06

12,500 08/23/06

08/23/06

5,007

100

210 06 0240 / 4477

N LA SALLE ST AND W WASHINGTON ST

8.0

05/01/06

06/01/06

11,000 08/23/06

08/23/06

5,224

100

210 06 0207 / 4450

N LOWER MICHIGAN AVE AND E GRAND AVE

1.0

08/15/05

11/15/05

6,600 10/06/05

11/15/05

5,792

100

210 06 0207 / 4450

N MICHIGAN AVE AND E GRAND AVE

1.0

08/15/05

11/15/05

8,800 08/26/05

12/02/05

5,792

100

210 06 0207 / 4450

N MICHIGAN AVE AND E OAK ST

1.0

08/15/05

08/01/05

8,959 08/26/05

08/26/05

2,982

100

210 06 0207 / 4450

N MICHIGAN AVE AND E RANDOLPH ST

1.0

12/01/04

12/15/04

12,650 12/01/04

12/08/04

6,617

100

210 06 0207 / 4450

N MICHIGAN AVE AND E WASHINGTON ST

1.0

12/01/04

12/15/04

7,672 12/01/04

12/08/04

6,079

100

210 06 0207 / 4450

N PESHTIGO CT AND E GRAND AVE

1.0

08/15/05

11/15/05

4,400 04/26/05

11/18/05

5,792

100

8,800 10/06/05

10/19/05

24,000

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 451

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install

Locations

210 06 0207 / 4450

N PESHTIGO CT AND E ILLINOIS ST

1.0

08/15/05

11/15/05

6,600 10/06/05

10/19/05

5,792

100

210 06 0207 / 4450

N ST CLAIR ST AND E GRAND AVE

1.0

08/15/05

11/15/05

8,800 10/06/05

10/19/05

5,792

100

210 06 0207 / 4450

N STREETER DR AND E ILLINOIS ST

1.0

08/15/05

11/15/05

6,600 10/06/05

10/19/05

5,792

100

210 06 0243 / 4480

N WABASH AVE AND E WASHINGTON ST

.0

03/15/06

05/08/07

12,000 01/15/07

02/15/07

5,213

100

210 06 0207 / 4450

S MICHIGAN AVE AND E ADAMS ST

1.0

12/01/04

12/15/04

5,180 12/01/04

12/08/04

4,361

100

210 06 0207 / 4450

S MICHIGAN AVE AND E JACKSON BLVD

.50

12/01/04

12/15/04

5,179 12/01/04

12/08/04

5,255

100

210 06 0207 / 4450

S MICHIGAN AVE AND E MONROE ST

1.0

12/01/04

12/15/04

10,358 12/01/04

12/08/04

18,193

100

210 06 0243 / 4480

W ILLINOIS ST AND N LA SALLE DR

.0

04/01/06

04/01/07

11,356 07/18/07

07/18/07

4,190

100

Totals per Pedestrian Countdown Signal Install

Work Type: Pedestrian Countdown Signal Installation

38.50

192,754

139,612

Installations

210 06 / 32276

E DELAWARE PL AND N MICHIGAN AVE

.0

04/01/07

02/28/08

11,744

0

0

210 06 / 32276

N CANAL ST AND W MADISON ST

.0

04/01/07

02/28/08

11,356

0

0

210 06 / 32276

N CLINTON ST AND W MADISON ST

.0

04/01/07

02/28/08

11,356

0

0

210 06 / 32276

N FAIRBANKS CT AND E ONTARIO ST

.0

04/01/07

02/28/08

11,356

0

0

45,812

0

Totals per Pedestrian Countdown Signal Installation

Work Type: Signal Removal 300 06 0225 / 5340

N DESPLAINES ST AND W RANDOLPH ST

Work Type: Signals 300 06 0096 / 5258

121 N LA SALLE ST

.0

Locations .50

11/01/02

11/30/02

2,500 09/25/02

11/14/02

1,906

100

03/01/05

03/01/05

0 08/31/06

10/30/06

0

0

Intersections 161.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 452

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

300 09 / 33108

ON N WABASH AVE FROM E SUPERIOR ST TO E ONTARIO ST

1.0

6,600 04/01/08

12/01/08

0

0

210 06 0022 / 4297

N CLARK ST AND W ERIE ST

1.0

07/01/02

08/30/02

15,000 06/10/02

08/25/02

14,645

100

210 06 0023 / 4298

N CLARK ST AND W ERIE ST

1.0

01/15/03

03/15/03

139,000 11/20/02

12/24/02

133,112

100

210 06 0021 / 4296

N CLARK ST AND W MAPLE ST

1.0

02/01/01

05/31/01

133,500 11/15/00

03/06/01

153,138

100

210 06 0023 / 4298

N CLARK ST AND W SUPERIOR ST

1.0

02/01/03

04/01/03

133,000 11/20/02

01/08/03

103,819

100

210 06 0184 / 4430

N FAIRBANKS CT AND E HURON ST

1.0

09/15/04

03/01/05

180,000 09/15/04

02/25/05

170,452

100

210 06 0021 / 4296

N ORLEANS ST AND W SUPERIOR ST

1.0

11/06/00

12/31/01

133,000 11/03/00

10/30/01

166,266

100

210 06 0023 / 4298

N RUSH ST AND E WALTON ST

1.0

03/15/03

05/15/03

108,000 01/06/03

02/21/03

131,439

100

210 06 0022 / 4297

N STATE ST AND E BELLEVUE PL

1.0

03/15/02

05/17/02

143,500 01/17/02

05/07/02

175,165

100

210 06 0023 / 4298

N WELLS ST AND W HURON ST

1.0

07/01/03

09/01/03

139,000 03/31/03

05/12/03

134,983

100

300 11 / 32231

W CHESTNUT ST AND N DEARBORN ST

1.0

11/29/06

06/21/07

18,652 11/29/06

06/21/07

178,652

100

210 06 0135 / 4393

W LAKE ST AND N CLINTON ST

1.0

09/14/01

12/31/01

138,405 09/14/01

11/21/01

12,387

100

300 03 0042 / 4913

W ONTARIO ST AND N KINGSBURY ST

1.0

814 06 0301 / 16513

382 E BALBO DR

1.0

271 00 0045 / 4794

400 E OHIO ST

1.0

814 06 0332 / 16535

430 N CLARK ST

1.0

04/24/97

814 06 0343 / 16541

1600 N CLARK ST

1.0

01/01/96

814 06 0241 / 16453

500 N COLUMBUS DR

1.0

814 06 0330 / 16533

430 N DEARBORN ST

210 06 0060 / 4327

200,000 04/19/90

04/19/90

0

0 04/19/90

04/19/90

277,443

0 08/01/97

08/15/99

201,000

100

04/24/97

0 04/24/97

07/31/97

200,000

100

01/01/96

0 01/01/96

01/06/98

146,217

100

01/01/93

01/01/93

0 01/01/93

01/01/93

8,000

100

1.0

04/08/97

04/08/97

0 04/08/97

05/06/97

200,000

100

658 N DEARBORN ST

1.0

06/01/99

12/01/99

150,000 03/03/99

09/23/99

100,448

100

210 06 0061 / 4328

700 N DEARBORN ST

1.0

06/01/99

12/01/99

150,000 07/06/99

09/23/99

124,041

100

210 06 0062 / 4329

732 N DEARBORN ST

1.0

06/01/99

12/01/99

150,000 06/07/99

09/23/99

106,124

100

814 06 0246 / 16458

100 N JEFFERSON ST

1.0

02/06/92

02/06/92

0 02/06/92

02/06/92

88,990

100

814 06 0228 / 16440

148 N JEFFERSON ST

1.0

02/07/92

02/07/92

0 02/07/92

02/07/92

88,990

100

814 06 0209 / 16421

200 N JEFFERSON ST

1.0

02/04/92

02/04/92

0 02/04/92

02/04/92

88,990

100

814 06 0182 / 16394

300 N JEFFERSON ST

1.0

03/23/92

03/23/92

0 03/23/92

03/23/92

106,743

100

814 06 0272 / 16484

800 N MIES VAN DER ROHE WY

1.0

01/24/89

01/24/89

0 01/24/89

01/24/89

95,000

100

814 06 0305 / 16517

500 N ORLEANS ST

1.0

01/08/92

01/08/92

0 01/08/92

01/08/92

110,000

100

814 06 0306 / 16518

530 N ORLEANS ST

1.0

01/02/92

01/02/92

0 01/02/92

01/02/92

110,000

100

210 06 0072 / 4336

700 N ORLEANS ST

1.0

02/10/00

04/15/00

150,000 02/17/00

06/27/00

165,236

100

210 06 0019 / 4294

932 N STATE ST

1.0

125,000 10/16/98

10/29/98

90,174

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 453

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0019 / 4294

1000 N STATE ST

1.0

125,000 11/18/98

03/22/99

115,227

100

814 06 0267 / 16479

430 N WELLS ST

1.0

03/11/92

03/11/92

0 03/11/92

03/11/92

108,062

100

814 06 0263 / 16475

500 N WELLS ST

1.0

03/10/92

03/10/92

0 03/10/92

03/10/92

108,062

100

814 06 0131 / 16345

500 S LAKE SHORE DR

1.0

05/22/90

05/22/90

0 05/22/90

05/22/90

115,491

100

300 06 0078 / 5241

36 W ILLINOIS ST

1.0

06/15/00

07/01/00

5,000 07/14/00

07/18/00

11,701

100

210 06 0167 / 4418

540 W MADISON ST

2.0

09/01/03

12/31/03

417,924 09/06/01

10/27/03

306,019

100

814 06 0235 / 16447

600 W MADISON ST

1.0

02/05/92

02/05/92

0 02/05/92

02/05/92

88,990

100

814 06 0242 / 16454

421 W WASHINGTON ST

1.0

01/01/94

01/01/94

0 01/01/94

01/01/94

120,000

100

Totals per TSM Install

40.0

2,760,581

4,655,006

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 454

1/1/2008 AND 12/31/2008

Ward 42 Brendan Reilly CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting

Locations

300 07 0042 / 5465

ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST

.0

03/01/06

12/31/06

0

0

0

300 07 0043 / 5466

ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE

9.0

04/18/06

11/18/06

3,675 08/04/06

09/01/06

0

100

300 06 0251 / 5361

ON N MICHIGAN AVE FROM E MADISON ST TO E LAKE ST

214.0

07/15/05

08/30/05

20,404 07/10/05

08/01/05

49,605

100

300 07 0042 / 5465

ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W HURON ST TO W ERIE ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM CHESTNUT ST TO PEARSON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N STATE ST FROM ERIE ST TO HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E ERIE ST TO E HURON ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ERIE ST FROM N STATE ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST

.0

03/01/06

12/31/06

0

0

0

300 07 0042 / 5465

121 N LA SALLE ST

21.0

04/18/06

11/18/06

4,146

100

Totals per Traffic Equipment Painting

Work Type: Traffic Equipment Reloc 300 06 0225 / 5340

N JEFFERSON ST AND W LAKE ST

Work Type: Traffic Monitoring Cameras 300 06 0225 / 5340

E MONROE ST AND S MICHIGAN AVE

244.0

7,500 08/14/06

09/01/06

31,579

53,751

Locations 1.0

11/14/03

11/14/03

3,500 11/05/03

11/05/03

1,234

100

11/01/02

11/30/02

5,000 10/28/02

10/28/02

1,400

100

Locations 1.0

Totals per Construction Phase

7,012,377

10,037,432

Totals for Ward 42

7,089,854

10,049,383

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 455

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

1,391

100

300 06 / 32146

ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE

1.0

05/01/07

10/31/07

3,900 07/03/07

07/31/07

2,000

100

300 11 / 32232

N CLARK ST AND N LINCOLN AVE

1.0

06/01/07

12/31/07

0

2,317

100

300 11 / 32232

N CLARK ST AND W FULLERTON PKWY

1.0

06/01/07

12/31/07

0

290

100

300 11 / 32232

N CLARK ST AND W WEBSTER AVE

1.0

06/01/07

12/31/07

0

2,897

100

300 11 / 32232

N HALSTED ST AND W WEBSTER AVE

1.0

06/01/07

12/31/07

0

232

100

300 11 / 32232

N LINCOLN AVE AND W WEBSTER AVE

.0

06/01/07

12/31/07

0

0

0

300 11 / 32232

W ARMITAGE AVE AND N CLARK ST

1.0

06/01/07

12/31/07

0

5,301

100

300 11 / 32232

W ARMITAGE AVE AND N HALSTED ST

1.0

06/01/07

12/31/07

0

290

100

300 11 / 32232

W BELDEN AVE AND N CLARK ST

.0

06/01/07

12/31/07

0

3,186

0

210 06 0240 / 4477

W DIVERSEY PKWY AND N SHERIDAN RD

.0

10/10/05

07/31/06

210 06 0240 / 4477

W NORTH AVE AND N SEDGWICK ST

.0

10/10/05

210 06 0207 / 4450

2350 N LINCOLN AVE

.0

07/01/04

Totals per Design/Engineering

Work Type: Feasibility Study

600 10/10/05

04/27/06

250

100

07/31/06

600 10/10/05

08/08/06

125

100

12/30/04

1,500 08/02/06

08/08/06

470

100

7.0

6,600

18,749

Projects

302 00 0079 / 5767

ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

302 00 0079 / 5767

ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

Totals per Feasibility Study Totals per Lighting/Electrical

.0

0

0

6,600

18,749

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 456

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 07 0032 / 5455

ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE

1.0

04/18/06

11/18/06

400 09/22/06

10/10/06

202

100

300 06 0122 / 5275

ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST

6.0

11/01/03

11/07/03

2,250 10/30/03

10/30/03

1,461

100

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

2.50

04/18/06

11/18/06

1,000 09/22/06

10/10/06

505

100

300 07 0032 / 5455

ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

2.50

04/18/06

11/18/06

1,000 09/22/06

10/10/06

0

100

300 06 0069 / 5233

900 W MONTANA ST

5.0

02/16/03

02/16/03

1,015 02/13/03

02/13/03

2,089

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

17.0

5,665

4,257

Fixtures

300 09 / 33109

ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE

12.0

07/07/08

07/11/08

5,800 07/07/08

07/11/08

4,142

100

300 09 / 33109

ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

9.0

02/01/08

12/31/08

3,600 08/07/08

08/11/08

3,048

100

300 09 / 33109

ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE

9.0

06/23/08

06/27/08

3,600 04/01/08

12/01/08

0

0

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

1,600 09/07/06

10/10/06

808

100

300 06 0069 / 5233

ON W ARMITAGE AVE FROM N SHEFFIELD AVE TO N HALSTED ST

52.0

08/23/02

08/23/02

20,800 08/20/02

08/20/02

19,500

100

300 03 0043 / 4914

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

9.50

07/10/04

07/13/04

3,800 07/05/04

07/12/04

2,430

100

300 03 0044 / 4915

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

41.0

07/10/04

07/13/04

16,400 07/12/04

08/10/04

10,486

100

300 06 0069 / 5233

ON W FULLERTON AVE FROM N LINCOLN AVE TO N CLARK ST

24.0

12/15/03

12/21/03

9,000 01/13/04

01/18/04

3,702

100

300 07 0043 / 5466

ON W WEBSTER AVE FROM N CLEVELAND AVE TO N LINCOLN AVE

1.0

04/18/06

11/18/06

2,400 11/01/06

11/01/06

2,886

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

161.50

67,000

47,001

1,632,999

1,563,366

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 457

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 2021 / 8207

2421 N CLARK ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1655 / 7841

2440 N CLARK ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1637 / 7823

2464 N CLARK ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1648 / 7834

2581 N CLARK ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1629 / 7815

2634 N CLARK ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1610 / 7796

2749 N CLARK ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1465 / 7651

1518 N CLEVELAND AVE

1.0

05/23/96

05/23/96

0 05/23/96

05/23/96

300

100

805 06 1511 / 7697

2325 N COMMONWEALTH AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1492 / 7678

2330 N COMMONWEALTH AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1473 / 7659

2331 N COMMONWEALTH AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1484 / 7670

2350 N COMMONWEALTH AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1773 / 7959

1704 N CRILLY CT

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1784 / 7970

1720 N CRILLY CT

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0850 / 7036

1651 N DAYTON ST

1.0

11/06/96

11/06/96

0 11/06/96

11/06/96

300

100

805 06 1142 / 7328

1651 N DAYTON ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1153 / 7339

2617 N DAYTON ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1134 / 7320

2730 N DAYTON ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1140 / 7326

1814 N HALSTED ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1129 / 7315

1914 N HALSTED ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1150 / 7336

1959 N HALSTED ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1131 / 7317

1973 N HALSTED ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1132 / 7318

2009 N HALSTED ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1133 / 7319

2021 N HALSTED ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1135 / 7321

2045 N HALSTED ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1136 / 7322

2049 N HALSTED ST

1.0

12/09/96

12/09/96

0 12/09/96

12/09/96

300

100

805 06 1137 / 7323

2145 N HALSTED ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1138 / 7324

2213 N HALSTED ST

1.0

04/27/96

04/27/96

0 04/27/96

04/27/96

300

100

805 06 1105 / 7291

2237 N HALSTED ST

1.0

04/22/96

04/22/96

0 04/22/96

04/22/96

300

100

805 06 1151 / 7337

2417 N HALSTED ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1121 / 7307

2705 N HALSTED ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1066 / 7252

2730 N HALSTED ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 458

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1067 / 7253

2733 N HALSTED ST

1.0

12/24/96

12/24/96

0 12/24/96

12/24/96

300

100

805 06 1054 / 7240

2630 N HAMPDEN CT

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1461 / 7647

1518 N HUDSON AVE

1.0

12/03/97

12/03/97

0 12/03/97

12/03/97

300

100

805 06 1215 / 7401

1812 N HUDSON AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 1186 / 7372

1834 N HUDSON AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 1188 / 7374

2144 N HUDSON AVE

1.0

12/03/96

12/03/96

0 12/03/96

12/03/96

300

100

805 06 0304 / 6490

2265 N LINCOLN AVE

1.0

05/23/96

05/23/96

0 05/23/96

05/23/96

300

100

805 06 0350 / 6536

2358 N LINCOLN AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 2091 / 8277

1811 N LINCOLN PARK WEST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1933 / 8119

2622 N MILDRED AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1964 / 8150

2651 N MILDRED AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 1923 / 8109

1617 N MOHAWK ST

1.0

06/05/96

06/05/96

0 06/05/96

06/05/96

300

100

805 06 1952 / 8138

1631 N MOHAWK ST

1.0

01/26/96

01/26/96

0 01/26/96

01/26/96

300

100

805 06 1980 / 8166

2011 N MOHAWK ST

1.0

01/26/96

01/26/96

0 01/26/96

01/26/96

300

100

805 06 1941 / 8127

2043 N MOHAWK ST

1.0

01/26/96

01/26/96

0 01/26/96

01/26/96

300

100

805 06 0604 / 6790

2219 N ORCHARD ST

1.0

11/21/96

11/21/96

0 11/21/96

11/21/96

300

100

805 06 0595 / 6781

2223 N ORCHARD ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0629 / 6815

2229 N ORCHARD ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0630 / 6816

1811 N ORLEANS ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0601 / 6787

1823 N ORLEANS ST

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0602 / 6788

1823 N ORLEANS ST

1.0

12/03/96

12/03/96

0 12/03/96

12/03/96

300

100

805 06 0603 / 6789

1824 N ORLEANS ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0586 / 6772

1840 N ORLEANS ST

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0529 / 6715

2700 N PINE GROVE AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1462 / 7648

1520 N SEDGWICK ST

1.0

12/03/97

12/03/97

0 12/03/97

12/03/97

300

100

805 06 0621 / 6807

1618 N SEDGWICK ST

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0673 / 6859

2113 N SHEFFIELD AVE

1.0

05/16/96

05/16/96

0 05/16/96

05/16/96

300

100

805 06 0641 / 6827

2131 N SHEFFIELD AVE

1.0

05/17/96

05/17/96

0 05/17/96

05/17/96

300

100

805 06 0718 / 6904

830 W ALTGELD ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0706 / 6892

907 W ALTGELD ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0732 / 6918

1018 W ALTGELD ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 459

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0733 / 6919

1113 W ALTGELD ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0737 / 6923

950 W ARMITAGE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0852 / 7038

549 W BELDEN AVE

1.0

12/05/96

12/05/96

0 12/05/96

12/05/96

300

100

805 06 0854 / 7040

619 W BELDEN AVE

1.0

12/04/96

12/04/96

0 12/04/96

12/04/96

300

100

805 06 1564 / 7750

315 W CONCORD PL

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0997 / 7183

613 W DIVERSEY PKWY

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0670 / 6856

237 W EUGENIE ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0761 / 6947

335 W EUGENIE ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 0632 / 6818

403 W EUGENIE ST

1.0

11/29/96

11/29/96

0 11/29/96

11/29/96

300

100

805 06 1116 / 7302

722 W FULLERTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1117 / 7303

903 W FULLERTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1118 / 7304

949 W FULLERTON AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1801 / 7987

428 W FULLERTON PKWY

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1113 / 7299

626 W FULLERTON PKWY

1.0

12/05/96

12/05/96

0 12/05/96

12/05/96

300

100

805 06 0336 / 6522

1103 W LILL AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 0337 / 6523

1113 W LILL AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 1972 / 8158

1018 W MONTANA ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1962 / 8148

1032 W MONTANA ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1951 / 8137

1140 W MONTANA ST

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

805 06 1464 / 7650

435 W NORTH AVE

1.0

12/03/97

12/03/97

0 12/03/97

12/03/97

300

100

805 06 1466 / 7652

525 W NORTH AVE

1.0

12/03/97

12/03/97

0 12/03/97

12/03/97

300

100

805 06 0620 / 6806

637 W SCHUBERT AVE

1.0

12/05/96

12/05/96

0 12/05/96

12/05/96

300

100

805 06 0513 / 6699

636 W WEBSTER AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0511 / 6697

652 W WEBSTER AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0503 / 6689

658 W WEBSTER AVE

1.0

11/20/96

11/20/96

0 11/20/96

11/20/96

300

100

805 06 0463 / 6649

323 W WISCONSIN ST

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0470 / 6656

444 W WRIGHTWOOD AVE

1.0

12/04/96

12/04/96

0 12/04/96

12/04/96

300

100

300 06 0139 / 5289

735 W WRIGHTWOOD AVE

596.0

03/01/06

09/01/06

13,796 05/10/06

06/01/06

18,007

100

302 00 0092 / 5774

735 W WRIGHTWOOD AVE

25.0

0 01/04/01

01/17/02

5,891

100

805 06 0472 / 6658

931 W WRIGHTWOOD AVE

1.0

12/26/96

12/26/96

0 12/26/96

12/26/96

300

100

805 06 0473 / 6659

939 W WRIGHTWOOD AVE

1.0

12/23/96

12/23/96

0 12/23/96

12/23/96

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 460

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0215 / 5336

735 W WRIGHTWOOD AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

735 W WRIGHTWOOD AVE

Work Type: Flood Light Install

Installations 712.0

13,796

51,198

Lamps 1,796.0

06/01/07

12/31/07

52,874 07/10/07

08/16/07

52,874

100

0 05/17/02

05/20/02

29,151

100

Installations 1,601.0

Fixtures

300 06 0167 / 5306

N ORCHARD ST AND W DEMING PL

2.0

0 11/30/99

11/30/99

702

100

302 00 0092 / 5774

602 W DICKENS AVE

1.0

0 08/22/01

08/22/01

404

100

3.0

0

Totals per Flood Light Install

Work Type: Lighting Imprvmnts

1,106

Projects

300 06 0203 / 5326

ON W WISCONSIN ST FROM N SEDGWICK ST TO N CLEVELAND AVE

08/01/01

12/01/01

46,535 07/25/01

07/30/01

44,487

100

300 06 0203 / 5326

1900 N LINCOLN AVE

08/01/01

12/01/01

29,702 08/17/01

10/15/01

12,671

100

300 06 0203 / 5326

2000 N LINCOLN AVE

08/01/01

12/01/01

74,098 08/06/01

08/16/01

53,725

100

300 06 0203 / 5326

1900 N SEDGWICK ST

08/01/01

12/01/01

29,510 07/31/01

08/03/01

6,183

100

300 06 0118 / 5272

2400 N SHEFFIELD AVE

10/30/00

06/29/01

92,687 03/06/01

05/16/01

96,827

100

Totals per Lighting Imprvmnts

Work Type: Ornamental - Piggyback Lighting

1.0 1.0

272,532

213,893

Fixtures

300 09 / 33109

ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE

22.0

07/28/08

08/01/08

29,700 07/28/08

08/01/08

24,493

100

300 09 / 33109

ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

9.0

08/25/08

09/12/08

12,150 08/25/08

09/12/08

10,324

100

300 07 0032 / 5455

ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE

4.0

04/18/06

11/18/06

5,400 09/22/06

10/10/06

3,425

100

300 06 0069 / 5233

ON W ARMITAGE AVE FROM N HALSTED ST TO N ORCHARD ST

9.0

12/10/02

12/11/02

10,800 12/10/02

12/11/02

12,245

100

300 06 0122 / 5275

ON W NORTH AVE FROM N WELLS ST TO N CLARK ST

8.45

08/20/03

08/25/03

10,530 08/19/03

08/25/03

9,781

100

300 06 0122 / 5275

ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY

6.50

08/20/03

08/25/03

8,100 08/19/03

08/22/03

15,048

100

300 06 0069 / 5233

N CLARK ST AND W FULLERTON AVE

35.0

12/01/02

12/20/02

42,000 12/01/02

12/20/02

45,531

100

300 06 0122 / 5275

160 W WENDELL ST

1.0

06/01/04

07/01/04

1,450 05/25/04

05/25/04

1,200

100

Totals per Ornamental - Piggyback Lighting

94.95

120,130

122,047

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 461

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residential Regrouping

Lamps

735 W WRIGHTWOOD AVE

.0

300 06 0270 / 5378

Work Type: Residntl Staggered Lighting

03/01/08

12/01/08

0

ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE

2.0

04/01/06

06/01/06

102,397 03/27/06

300 06 / 32146

ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE

4.0

12/05/07

06/24/08

245,174 12/12/07

300 06 0298 / 5405

ON W BLACKHAWK ST FROM N HALSTED ST TO N FREMONT ST

2.0

06/01/05

07/15/05

0 06/10/05

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON N BURLING ST FROM W FULLERTON AVE TO W SCHUBERT AVE

302 00 0092 / 5774

ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

1401 N WIELAND ST

0

76,570

100

Blocks

300 06 0308 / 5414

Totals per Residntl Staggered Lighting

0

8.0

05/12/06

07/29/05

347,571

0

50

85,262

100

161,832

Blocks 2.0

03/10/03 08/13/01

2.0

05/06/03

221,216 03/10/03

05/06/03

218,036

100

41,000 08/13/01

09/07/01

40,581

100

262,216

258,617

Locations 1.0

0 01/23/01

01/23/01

378

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 462

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 07 0043 / 5466

ON E BANKS ST FROM N STATE PKWY TO N LAKE SHORE DR WEST

8.0

04/18/06

11/18/06

1,600 08/04/06

09/01/06

1,554

100

300 07 0043 / 5466

ON E BURTON PL FROM N STATE PKWY TO N LAKE SHORE DR WEST

5.0

04/18/06

11/18/06

1,000 08/04/06

09/01/06

971

100

300 07 0043 / 5466

ON E GOETHE ST FROM N STATE PKWY TO N LAKE SHORE DR WEST

6.0

04/18/06

11/18/06

1,200 08/04/06

09/01/06

1,165

100

300 07 0043 / 5466

ON E SCHILLER ST FROM N STATE PKWY TO N LAKE SHORE DR WEST

8.0

04/18/06

11/18/06

1,600 08/04/06

09/01/06

1,554

100

300 07 0043 / 5466

ON E SCOTT ST FROM N STATE PKWY TO N LAKE SHORE DR WEST

6.0

04/18/06

11/18/06

1,200 08/04/06

09/01/06

1,165

100

300 07 0043 / 5466

ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE

27.0

04/18/06

11/18/06

5,400 08/04/06

09/01/06

5,244

100

300 05 0043 / 5158

ON N BISSELL ST FROM N DAYTON ST TO W BELDEN AVE

34.0

04/04/05

11/18/05

6,800 06/27/05

07/23/05

5,451

100

300 09 / 33109

ON N BISSELL ST FROM W ARMITAGE AVE TO W BELDEN AVE

14.0

05/19/08

06/20/08

2,800 04/01/08

12/01/08

1,680

100

300 07 0043 / 5466

ON N BURLING ST FROM W FULLERTON AVE TO W ARMITAGE AVE

8.0

04/18/06

11/18/06

1,600 08/04/06

09/01/06

1,554

100

300 06 0108 / 5263

ON N CLARK ST FROM W NORTH AVE TO W ARMITAGE AVE

61.0

06/20/03

07/01/03

22,200 07/07/03

07/17/03

22,190

100

300 09 / 33109

ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE

9.80

05/19/08

06/20/08

1,960 04/01/08

12/01/08

1,176

100

300 07 0043 / 5466

ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W FULLERTON PKWY

17.0

04/18/06

11/18/06

3,400 08/04/06

09/01/06

3,301

100

300 05 0043 / 5158

ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W NORTH AVE

16.0

04/04/05

11/18/05

3,200 06/27/05

07/23/05

2,565

100

300 09 / 33109

ON N CLIFTON AVE FROM W ARMITAGE AVE TO W DICKENS AVE

1.0

05/19/08

06/20/08

200 04/01/08

12/01/08

120

100

300 07 0043 / 5466

4.0

04/18/06

11/18/06

800 08/04/06

09/01/06

777

100

300 06 0108 / 5263

ON N COMMONWEALTH AVE FROM W BELDEN AVE TO W FULLERTON PKWY ON N CRILLY CT FROM W EUGENIE ST TO W ST PAUL AVE

3.0

06/20/03

07/01/03

560 07/07/03

07/17/03

587

100

300 06 0108 / 5263

ON N CRILLY CT FROM W WILLOW ST TO W MENOMONEE ST

3.0

06/20/03

07/01/03

560 07/07/03

07/17/03

587

100

300 05 0043 / 5158

ON N DAYTON ST FROM N BISSELL ST TO W BELDEN AVE

32.0

04/04/05

11/18/05

6,400 06/27/05

07/23/05

5,130

100

300 09 / 33109

ON N DAYTON ST FROM W ARMITAGE AVE TO W BELDEN AVE

12.0

05/19/08

06/20/08

2,400 04/01/08

12/01/08

14,400

100

300 09 / 33109

ON N DAYTON ST FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY

8.0

05/19/08

06/20/08

1,600 04/01/08

12/01/08

960

100

300 05 0043 / 5158

ON N FERN CT FROM W EUGENIE ST TO W WILLOW ST

4.0

04/04/05

11/18/05

800 06/27/05

07/23/05

641

100

300 05 0043 / 5158

ON N FREMONT ST FROM N BISSELL ST TO W BELDEN AVE

33.0

04/04/05

11/18/05

6,600 06/27/05

07/23/05

5,291

100

300 09 / 33109

ON N FREMONT ST FROM W ARMITAGE AVE TO W BELDEN AVE

18.0

05/19/08

06/20/08

3,600 04/01/08

12/01/08

2,160

100

300 09 / 33109

ON N GENEVA TER FROM W FULLERTON PKWY TO W DEMING PL

6.0

05/19/08

06/20/08

1,200 04/01/08

12/01/08

720

100

300 07 0043 / 5466

ON N GENEVA TER FROM W WEBSTER AVE TO W FULLERTON PKWY

9.0

04/18/06

11/18/06

2,250 08/04/06

09/01/06

1,748

100

302 00 0076 / 5764

ON N HALSTED ST FROM W NORTH AVE TO W FULLERTON AVE

07/08/98

07/08/98

0 07/08/98

07/08/98

0

300 09 / 33109

ON N HAMPDEN CT FROM W DEMING PL TO W DIVERSEY PKWY

11.0

05/19/08

06/20/08

2,200 04/01/08

12/01/08

1,320

100

300 07 0043 / 5466

ON N HOWE ST FROM W ARMITAGE AVE TO W DICKENS AVE

5.0

04/18/06

11/18/06

1,000 08/04/06

09/01/06

971

100

300 05 0043 / 5158

ON N HOWE ST FROM W WILLOW ST TO W ARMITAGE AVE

12.0

04/04/05

11/18/05

2,400 06/27/05

07/23/05

1,924

100

300 09 / 33109

ON N HUDSON AVE FROM W BLACKHAWK ST TO W NORTH AVE

4.0

05/19/08

06/20/08

800 04/01/08

12/01/08

480

100

300 07 0043 / 5466

ON N HUDSON AVE FROM W DICKENS AVE TO W WEBSTER AVE

5.0

04/18/06

11/18/06

1,000 08/04/06

09/01/06

971

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 463

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 05 0043 / 5158

ON N HUDSON AVE FROM W MENOMONEE ST TO W ARMITAGE AVE

8.0

04/04/05

11/18/05

1,600 06/27/05

07/23/05

1,283

100

300 05 0043 / 5158

ON N HUDSON AVE FROM W NORTH AVE TO W WILLOW ST

8.0

04/04/05

11/18/05

1,600 06/27/05

07/23/05

1,283

100

300 09 / 33109

ON N KENMORE AVE FROM W ARMITAGE AVE TO W DICKENS AVE

2.0

05/19/08

06/20/08

400 04/01/08

12/01/08

240

100

300 07 0043 / 5466

ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE

14.50

04/18/06

11/18/06

3,625 08/04/06

09/01/06

0

100

300 05 0043 / 5158

ON N LARRABEE ST FROM W NORTH AVE TO W ARMITAGE AVE

37.0

04/04/05

11/18/05

7,400 06/27/05

07/23/05

8,003

100

300 09 / 33109

ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE

22.0

06/30/08

07/07/08

5,500 06/30/08

07/07/08

4,400

100

300 05 0043 / 5158

3.0

04/04/05

11/18/05

600 06/27/05

07/23/05

481

100

300 09 / 33109

ON N LINCOLN PARK WEST FROM W MENOMONEE ST TO W WISCONSIN ST ON N MAGNOLIA AVE FROM W DICKENS AVE TO N CLYBOURN AVE

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 05 0043 / 5158

ON N MEYER AVE FROM N CLEVELAND AVE TO W EUGENIE ST

4.0

04/04/05

11/18/05

800 06/27/05

07/23/05

641

100

300 09 / 33109

ON N MILDRED AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY

6.0

05/19/08

06/20/08

1,200 04/01/08

12/01/08

720

100

300 05 0043 / 5158

ON N MOHAWK ST FROM W ARMITAGE AVE TO W NORTH AVE

16.0

04/04/05

11/18/05

3,200 06/27/05

07/23/05

2,565

100

300 09 / 33109

ON N ORCHARD ST FROM W FULLERTON AVE TO W WRIGHTWOOD AVE

7.0

05/19/08

06/20/08

1,400 04/01/08

12/01/08

840

100

300 05 0043 / 5158

ON N ORCHARD ST FROM W NORTH AVE TO W ARMITAGE AVE

20.0

04/04/05

11/18/05

4,000 06/27/05

07/23/05

3,206

100

300 07 0043 / 5466

ON N ORCHARD ST FROM W WEBSTER AVE TO W FULLERTON AVE

9.0

04/18/06

11/18/06

2,250 08/04/06

09/01/06

1,748

100

300 07 0043 / 5466

ON N ORLEANS ST FROM W ARMITAGE AVE TO W DICKENS AVE

5.0

04/18/06

11/18/06

1,000 08/04/06

09/01/06

971

100

300 06 0108 / 5263

ON N ORLEANS ST FROM W EUGENIE ST TO W WILLOW ST

3.0

08/20/03

09/01/03

560 08/19/03

08/22/03

587

100

300 06 0108 / 5263

ON N ORLEANS ST FROM W MENOMONEE ST TO W WISCONSIN ST

3.0

08/01/03

09/08/03

560 08/01/03

08/22/03

587

100

300 09 / 33109

4.0

05/19/08

06/20/08

800 04/01/08

12/01/08

480

100

300 09 / 33109

ON N PINE GROVE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE

9.0

06/16/08

06/20/08

2,700 06/16/08

06/20/08

1,800

100

300 07 0043 / 5466

ON N RITCHIE CT FROM E GOETHE ST TO E BANKS ST

4.0

04/18/06

11/18/06

800 08/04/06

09/01/06

777

100

300 06 0108 / 5263

ON N SEDGWICK ST FROM W NORTH AVE TO W ARMITAGE AVE

16.0

08/01/03

09/08/03

2,970 08/01/03

08/22/03

3,134

100

300 07 0043 / 5466

ON N SEDGWICK ST FROM W WEBSTER AVE TO N LINCOLN AVE

14.0

04/18/06

11/18/06

2,800 08/04/06

09/01/06

2,719

100

300 09 / 33109

ON N SEMINARY AVE FROM W ARMITAGE AVE TO W DICKENS AVE

2.0

05/19/08

06/20/08

400 04/01/08

12/01/08

240

100

300 09 / 33109

ON N SEMINARY AVE FROM W FULLERTON AVE TO W LILL AVE

4.0

05/19/08

06/20/08

800 04/01/08

12/01/08

480

100

300 09 / 33109

ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE

6.75

05/19/08

06/20/08

1,350 04/01/08

12/01/08

1,350

100

300 05 0043 / 5158

ON N ST MICHAELS CT FROM W EUGENIE ST TO W WILLOW ST

5.0

04/04/05

11/18/05

1,000 06/27/05

07/23/05

802

100

300 07 0043 / 5466

ON N STONE ST FROM E DIVISION ST TO E GOETHE ST

8.0

04/18/06

11/18/06

1,600 08/04/06

09/01/06

1,554

100

300 05 0043 / 5158

ON N VINE ST FROM W NORTH AVE TO W WILLOW ST

7.0

04/04/05

11/18/05

1,400 06/27/05

07/23/05

1,122

100

300 09 / 33109

ON N WILTON AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY

6.0

05/19/08

06/20/08

1,200 04/01/08

12/01/08

720

100

300 09 / 33109

ON W ARLINGTON PL FROM N CLARK ST TO N ORCHARD ST

5.0

05/19/08

06/20/08

1,000 04/01/08

12/01/08

600

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 464

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 05 0043 / 5158

ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST

3.0

04/04/05

11/18/05

600 06/27/05

07/23/05

481

100

300 09 / 33109

ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

302 00 0079 / 5767

ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST

30.0

08/01/02

08/03/02

4,000 07/23/02

08/06/02

12,880

100

300 07 0043 / 5466

ON W BELDEN AVE FROM N LINCOLN PARK WEST TO N HALSTED ST

22.0

04/18/06

11/18/06

5,500 08/04/06

09/01/06

4,272

100

300 09 / 33109

ON W BLACKHAWK ST FROM N CLEVELAND AVE TO N LARRABEE ST

4.0

05/19/08

06/20/08

800 04/01/08

12/01/08

480

100

300 06 0108 / 5263

ON W CONCORD PL FROM N NORTH PARK AVE TO N SEDGWICK ST

3.0

08/01/03

08/08/03

560 08/01/03

08/15/03

587

100

300 09 / 33109

ON W DEMING PL FROM N CLARK ST TO N ORCHARD ST

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 05 0043 / 5158

ON W DICKENS AVE FROM N HALSTED ST TO N SHEFFIELD AVE

8.0

04/04/05

11/18/05

1,600 06/27/05

07/23/05

1,283

100

300 07 0043 / 5466

ON W DICKENS AVE FROM N LINCOLN AVE TO N HALSTED ST

15.0

04/18/06

11/18/06

3,750 08/04/06

09/01/06

2,913

100

300 03 0043 / 4914

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

14.50

07/26/04

08/09/04

4,725 07/01/04

08/10/04

2,961

100

300 03 0044 / 4915

ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR

72.0

07/26/04

08/09/04

15,950 08/01/04

08/10/04

14,703

100

300 09 / 33109

ON W DRUMMOND PL FROM N CLARK ST TO N ORCHARD ST

2.0

05/19/08

06/20/08

400 04/01/08

12/01/08

240

100

300 06 0108 / 5263

ON W EUGENIE ST FROM N LA SALLE ST TO N SEDGWICK ST

12.0

08/05/03

08/12/03

2,220 08/01/03

08/15/03

2,350

100

300 05 0043 / 5158

ON W EUGENIE ST FROM N SEDGWICK ST TO N LARRABEE ST

9.0

04/04/05

11/18/05

1,800 06/27/05

07/23/05

1,443

100

300 09 / 33109

ON W EVERGREEN AVE FROM N WELLS ST TO N NORTH PARK AVE

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 06 0058 / 5229

ON W FULLERTON AVE FROM N CLARK ST TO N LINCOLN AVE

27.0

12/01/02

01/01/03

5,670 12/01/02

01/09/03

5,670

100

302 00 0079 / 5767

ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE

101.60

12/01/01

12/22/01

12,800 04/20/01

05/03/01

12,700

100

300 07 0043 / 5466

ON W GRANT PL FROM N SEDGWICK ST TO N GENEVA TER

9.0

04/18/06

11/18/06

1,800 08/04/06

09/01/06

1,748

100

300 07 0043 / 5466

ON W KEMPER PL FROM N GENEVA TER TO N ORCHARD ST

3.0

04/18/06

11/18/06

600 08/04/06

09/01/06

582

100

300 09 / 33109

ON W LILL AVE FROM N HALSTED ST TO N LINCOLN AVE

5.0

05/19/08

06/20/08

1,000 04/01/08

12/01/08

600

100

300 07 0032 / 5455

ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE

2.50

04/18/06

11/18/06

500 01/05/07

01/05/07

0

100

300 06 0108 / 5263

ON W MENOMONEE ST FROM N CLARK ST TO N SEDGWICK ST

20.0

08/05/03

08/12/03

3,715 08/01/03

08/20/03

3,917

100

300 05 0043 / 5158

ON W MENOMONEE ST FROM N SEDGWICK ST TO N LARRABEE ST

11.0

04/04/05

11/18/05

2,200 06/27/05

07/23/05

1,764

100

300 09 / 33109

ON W MONTANA ST FROM N LINCOLN AVE TO N RACINE AVE

9.0

05/19/08

06/20/08

1,800 04/01/08

12/01/08

1,080

100

300 06 0108 / 5263

ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST

8.50

07/01/03

07/07/03

2,000 06/20/03

06/30/03

1,925

100

300 05 0043 / 5158

ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST

3.0

04/04/05

11/18/05

600 06/27/05

07/23/05

481

100

300 09 / 33109

ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 09 / 33109

ON W SCHILLER ST FROM N LA SALLE DR TO N WELLS ST

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 09 / 33109

ON W SCHUBERT AVE FROM N CLARK ST TO N HALSTED ST

14.0

05/19/08

06/20/08

2,800 04/01/08

12/01/08

1,680

100

300 09 / 33109

ON W SCHUBERT AVE FROM N DAYTON ST TO N SHEFFIELD AVE

3.0

05/19/08

06/20/08

600 04/01/08

12/01/08

360

100

300 06 0108 / 5263

ON W ST PAUL AVE FROM N NORTH PARK AVE TO N WELLS ST

3.0

08/01/03

08/07/03

560 08/01/03

08/20/03

587

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 465

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 05 0043 / 5158

ON W WEBSTER AVE FROM N HALSTED ST TO N SHEFFIELD AVE

23.0

04/04/05

11/18/05

4,600 06/27/05

07/23/05

3,687

100

300 07 0043 / 5466

ON W WEBSTER AVE FROM N LINCOLN PARK WEST TO N HALSTED ST

25.0

04/18/06

11/18/06

6,250 08/04/06

09/01/06

4,855

100

300 05 0043 / 5158

ON W WILLOW ST FROM N FERN CT TO N ST MICHAELS CT

7.0

04/04/05

11/18/05

1,400 06/27/05

07/23/05

1,122

100

300 05 0043 / 5158

ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE

2.50

04/04/05

11/18/05

500 06/27/05

07/23/05

401

100

300 05 0043 / 5158

ON W WILLOW ST FROM N LARRABEE ST TO N HALSTED ST

11.0

04/04/05

11/18/05

2,200 06/27/05

07/23/05

1,764

100

300 06 0108 / 5263

ON W WILLOW ST FROM N WELLS ST TO N SEDGWICK ST

12.0

08/02/03

08/09/03

2,220 08/01/03

08/21/03

2,350

100

300 06 0108 / 5263

ON W WISCONSIN ST FROM N CLARK ST TO N SEDGWICK ST

20.0

08/05/03

08/12/03

3,715 08/01/03

08/21/03

3,917

100

300 09 / 33109

ON W WRIGHTWOOD AVE FROM N CLARK ST TO N SHEFFIELD AVE

4.0

05/19/08

06/20/08

800 04/01/08

12/01/08

480

100

300 07 0043 / 5466

W BELDEN AVE AND N CAMBRIDGE AVE

3.0

04/18/06

11/18/06

600 08/04/06

09/01/06

582

100

Totals per Strt Light Pole Painting

1,187.65

Work Type: Strt Lighting

Blocks

300 06 0076 / 5239

1600 N CLYBOURN AVE

300 06 0078 / 5241

1600 N CLYBOURN AVE

300 06 0076 / 5239 303 00 0006 / 5783

230,695

06/01/00

09/15/00

58,500 07/05/00

07/25/00

66,504

100

04/01/98

12/01/98

51,000 07/05/00

07/25/00

11,552

100

1536 N SEDGWICK ST

06/01/00

09/15/00

58,500 05/22/00

06/15/00

66,504

100

2000 N SHEFFIELD AVE

08/01/97

12/01/97

60,000 08/01/97

04/30/98

76,547

100

1.0

1.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0238 / 5352

247,280

735 W WRIGHTWOOD AVE

228,000

221,107

Lamps 2,012.0

06/01/06

12/31/06

12,000 10/27/06

11/03/06

10,462

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 466

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2742 / 8928

98 E LA SALLE DR

302 00 0070 / 5758

100 E LA SALLE DR

302 00 0072 / 5760

1620 N HALSTED ST

1.0

805 06 2686 / 8872

1622 N HALSTED ST

48.0

03/11/91

805 06 2135 / 8321

1650 S CLARK ST

8.0

805 06 2268 / 8454

2495 S HALSTED ST

805 06 2270 / 8456

12/31/95

12/31/95

0 12/31/95

12/31/95

20,250

100

0 10/12/97

10/20/97

17,175

100

0 10/18/99

10/20/99

9,505

100

03/11/91

0 03/11/91

03/11/91

36,000

100

12/20/97

12/20/97

0 12/20/97

12/20/97

6,000

100

18.0

01/01/91

01/01/91

0 01/01/91

01/01/91

13,500

100

2495 S HALSTED ST

8.0

01/01/91

01/01/91

0 01/01/91

01/01/91

6,000

100

805 06 2754 / 8940

2495 S HALSTED ST

18.0

02/26/91

02/26/91

0 02/26/91

02/26/91

13,500

100

805 06 2710 / 8896

999 W FULLERTON AVE

28.0

06/16/94

06/16/94

0 06/16/94

06/16/94

21,000

100

805 06 2738 / 8924

40 W FULLERTON DR

14.0

01/01/90

01/01/90

0 01/01/90

01/01/90

10,500

100

300 06 0217 / 5337

735 W WRIGHTWOOD AVE

70.0

06/15/04

06/22/04

3,935 06/15/04

06/16/04

5,318

100

Totals per Underpass Lighting

27.0

240.0

3,935

158,748

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 467

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

300 06 0225 / 5340

2000 N CLYBOURN AVE

4.0

210 06 0130 / 4389

2330 N LINCOLN AVE

1.0

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0231 / 4470

W DIVISION ST AND N LA SALLE DR

300 06 0117 / 5271

2400 N CANNON DR

Totals per Left Turn Arrow

Work Type: Pedestrian Countdown Signal Install

09/02/02

10/31/02

5.0

17,250 08/14/02

10/14/02

14,369

100

0 10/10/01

10/10/01

3,979

100

17,250

18,348

Locations .0

03/01/08

12/01/08

15,516

1.0

20,000 10/29/99

1.0

35,516

11/15/99

Locations

N CLARK ST AND N LINCOLN AVE

1.0

300 11 / 32232

N CLARK ST AND N LINCOLN AVE

1.0

05/15/09

12/15/09

12,000

300 11 / 32232

N CLARK ST AND W FULLERTON PKWY

1.0

07/24/07

09/15/07

12,000 07/31/07

08/01/07

300 11 / 32232

N CLARK ST AND W WEBSTER AVE

1.0

08/01/07

08/02/07

12,000 07/26/07

300 11 / 32232

N HALSTED ST AND W WEBSTER AVE

1.0

06/25/07

07/26/07

12,000 06/25/07

300 11 / 32232

N LINCOLN AVE AND W WEBSTER AVE

1.0

300 11 / 32232

W ARMITAGE AVE AND N CLARK ST

1.0

06/15/07

07/30/07

12,000 07/10/07

07/11/07

300 11 / 32232

W ARMITAGE AVE AND N HALSTED ST

1.0

06/25/07

07/26/07

12,000 06/25/07

300 09 / 33109

W BELDEN AVE AND N CLARK ST

1.0

02/25/08

06/27/08

83,000 04/01/08

300 11 / 32232

W BELDEN AVE AND N CLARK ST

1.0

210 06 0240 / 4477

W DIVERSEY PKWY AND N SHERIDAN RD

6.0

11/06/06

09/20/07

210 06 0240 / 4477

W NORTH AVE AND N SEDGWICK ST

4.0

11/01/05

210 06 0207 / 4450

2350 N LINCOLN AVE

6.0

04/01/04

Totals per Pedestrian Countdown Signal Install

0 100

4,276

300 09 / 33109

Totals per Traffic

0 4,276

26.0

15,000 04/01/08

12/01/08

0

7

11,230

0

6,529

100

07/26/07

0

100

07/26/07

5,194

100

12,000

0

0

3,414

100

07/26/07

8,399

100

12/01/08

81,259

100

12,000

78,072

0

8,700 11/08/06

11/22/06

4,911

100

09/30/06

5,000 11/01/05

10/16/06

2,979

100

12/31/05

10,000 09/12/06

09/12/05

5,160

100

217,700

207,147

780,331

797,987

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 468

1/1/2008 AND 12/31/2008

Ward 43 Vi Daley CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Installation 300 11 / 32600

N CLARK ST AND N LINCOLN AVE

300 11 / 32600

N CLARK ST AND W FULLERTON PKWY

300 11 / 32600

Installations 1.0

09/08/07

01/04/08

11,520 07/23/07

07/25/07

0

100

.0

09/08/07

01/04/08

11,520 07/31/07

08/01/07

0

100

N CLARK ST AND W WEBSTER AVE

1.0

09/08/07

01/04/08

11,520 07/24/07

07/26/07

0

100

300 11 / 32600

N HALSTED ST AND W WEBSTER AVE

1.0

09/08/07

01/04/08

11,520 07/26/07

07/27/07

0

100

300 11 / 32600

N LINCOLN AVE AND W WEBSTER AVE

1.0

09/08/07

01/04/08

11,520 07/24/07

07/26/07

0

100

300 11 / 32600

W ARMITAGE AVE AND N CLARK ST

1.0

09/08/07

01/04/08

11,520 07/10/07

07/11/07

0

100

300 11 / 32600

W ARMITAGE AVE AND N HALSTED ST

1.0

09/08/07

01/04/08

11,520 07/25/07

07/26/07

0

100

300 11 / 32600

W BELDEN AVE AND N CLARK ST

1.0

09/08/07

01/04/08

11,520 02/25/08

06/05/08

6,529

100

Totals per Pedestrian Countdown Signal Installation

Work Type: Signals 300 06 0096 / 5258

735 W WRIGHTWOOD AVE

Work Type: TSM Install

7.0

92,160

6,529

Intersections 45.0

11/12/03

11/20/03

0 11/20/03

11/28/03

7,115

100

Locations

210 06 0013 / 4288

2100 N CLEVELAND AVE

1.0

02/17/99

09/01/99

259,000 12/15/98

02/15/99

221,697

100

210 06 0093 / 4355

2000 N CLYBOURN AVE

1.0

02/14/00

04/30/00

150,000 02/14/00

04/13/00

114,657

100

814 06 0254 / 16466

2331 N LINCOLN AVE

1.0

01/28/92

01/28/92

0 01/28/92

01/28/92

87,936

100

814 06 0389 / 16577

800 W ARMITAGE AVE

1.0

08/17/95

08/17/95

0 08/17/95

08/17/95

128,682

100

4.0

Totals per TSM Install

Work Type: Traffic Equipment Painting

409,000

552,972

Locations

300 07 0043 / 5466

ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE

6.0

04/18/06

11/18/06

1,800 08/04/06

09/01/06

1,165

100

300 07 0043 / 5466

ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE

9.0

04/18/06

11/18/06

3,675 08/04/06

09/01/06

0

100

300 06 0108 / 5263

N HALSTED ST AND W DIVERSEY AVE

04/01/05

04/10/05

1,260

300 06 0108 / 5263

N WELLS ST AND W NORTH AVE

04/01/05

04/10/05

1,470

300 09 / 33109

W FULLERTON AVE AND N HALSTED ST

05/19/08

06/20/08

1.0 16.0

500 05/19/08

0 0 06/20/08

435

8,705

1,600

Totals per Construction Phase

2,413,330

2,361,353

Totals for Ward 43

2,419,930

2,380,102

Totals per Traffic Equipment Painting

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 469

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE

.0

02/01/06

07/31/06

0 02/01/06

300 06 / 32277

ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE

.0

04/01/08

08/30/08

0

0

0

300 06 / 32146

ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST

.0

05/01/07

10/31/07

4,000

2,000

100

300 06 / 32277

ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE

.0

04/01/08

08/30/08

210 06 0240 / 4477

W DIVERSEY PKWY AND N SHERIDAN RD

.0

10/10/05

07/31/06

300 06 / 32146

3600-3800 N LAKEWOOD AVE

.0

05/01/07

10/31/07

300 06 0292 / 5399

3128 N SHEFFIELD AVE

1.0

2,000 02/08/05

300 06 0292 / 5399

3140 N SHEFFIELD AVE

1.0

3,000 08/02/05

2.0

9,600

Totals per Design/Engineering

07/31/06

0 600 10/10/05

04/27/06

0

2,916

100

0

0

250

100

0

100

2,839 11/16/05

0 8,005

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 470

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 03 0044 / 4915

ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE

5.0

07/01/04

07/01/04

2,075 05/16/04

05/16/04

1,220

100

300 03 0044 / 4915

ON W WELLINGTON AVE FROM N RACINE AVE TO N SHEFFIELD AVE

7.0

08/10/04

08/10/04

2,825 05/25/04

05/25/04

1,448

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 05 0044 / 5159

ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST

300 06 0122 / 5275

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

Totals per 400 Watt Changeout

Work Type: Alley Lighting/Lamps

12.0

4,900

2,668

Fixtures 45.0

04/04/05

11/18/05

4,434 09/01/05

09/25/05

0

100

27.50

11/01/03

11/21/03

11,200 10/05/03

10/06/03

7,718

100

72.50

15,634

7,718

Installations

805 06 2007 / 8193

3722 N LAKEWOOD AVE

1.0

01/27/97

01/27/97

0 01/27/97

01/27/97

300

100

805 06 0623 / 6809

3135 N SEMINARY AVE

1.0

10/01/96

10/01/96

0 10/01/96

10/01/96

300

100

805 06 0877 / 7063

547 W BELMONT AVE

1.0

09/04/96

09/04/96

0 09/04/96

09/04/96

300

100

805 06 1671 / 7857

549 W BELMONT AVE

1.0

07/18/97

07/18/97

0 07/18/97

07/18/97

300

100

805 06 0878 / 7064

854 W BELMONT AVE

1.0

11/06/96

11/06/96

0 11/06/96

11/06/96

300

100

805 06 0863 / 7049

924 W BELMONT AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 0880 / 7066

924 W BELMONT AVE

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

300 06 0139 / 5289

1057 W BELMONT AVE

741.0

03/01/06

09/01/06

19,365 05/24/06

06/01/06

22,389

100

302 00 0092 / 5774

1057 W BELMONT AVE

6.0

0 03/21/01

12/14/01

1,414

100

805 06 0825 / 7011

426 W BRIAR PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0810 / 6996

450 W BRIAR PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1198 / 7384

1000 W DAKIN ST

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 1682 / 7868

1000 W DAKIN ST

1.0

11/19/96

11/19/96

0 11/19/96

11/19/96

300

100

805 06 1120 / 7306

938 W GEORGE ST

1.0

05/02/96

05/02/96

0 05/02/96

05/02/96

300

100

805 06 1074 / 7260

1503 W HENDERSON ST

1.0

12/17/96

12/17/96

0 12/17/96

12/17/96

300

100

805 06 1106 / 7292

1519 W HENDERSON ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0693 / 6879

816 W ROSCOE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0694 / 6880

820 W ROSCOE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0695 / 6881

938 W ROSCOE ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1689 / 7875

1115 W ROSCOE ST

1.0

07/02/97

07/02/97

0 07/02/97

07/02/97

300

100

Totals per Alley Lighting/Lamps

765.0

19,365

29,203

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 471

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336

1057 W BELMONT AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

1057 W BELMONT AVE

Work Type: Flood Light Install 300 06 0167 / 5306

W ADDISON ST AND N SHEFFIELD AVE

300 06 0071 / 5234

3843 N CLARK ST

302 00 0092 / 5774

656 W BARRY AVE

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0118 / 5272

3200 N SHEFFIELD AVE

Work Type: Ornamental - Piggyback Lighting 300 06 0122 / 5275

ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST

300 06 0122 / 5275

ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD

300 06 0122 / 5275

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

1057 W BELMONT AVE

Totals per Lighting/Electrical

Lamps 1,325.0

06/01/07

12/31/07

39,008 08/01/07

08/10/07

39,008

100

0 05/04/02

05/07/02

21,668

100

0 05/18/99

05/18/99

351

100

0 11/15/00

11/16/00

3,000

100

2.0

0 09/06/01

09/06/01

807

100

3.0

0

Installations 1,190.0

Fixtures 1.0 11/15/00

11/16/00

4,158

Projects 1.0

10/30/00

06/29/01

98,049 03/26/01

05/21/01

80,036

100

09/15/03

09/20/03

66,000 09/26/03

10/02/03

88,094

100

11/01/04

11/30/04

48,250 10/01/04

11/01/04

30,189

100

11/01/03

11/21/03

25,800 10/14/03

10/20/03

37,364

100

Fixtures 55.0

21.50 76.50

140,050

155,646

0

0

5,617,077

3,355,956

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 472

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 06 0308 / 5414

ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE

2.0

03/27/06

05/27/06

142,196 03/16/06

05/18/06

99,896

100

300 11 / 32233

ON N CAMBRIDGE AVE FROM W BRIAR PL TO W BELMONT AVE

1.0

05/29/07

07/13/07

28,334 05/29/07

08/03/07

19,195

100

300 09 / 33110

ON N CAMBRIDGE AVE FROM W DIVERSEY PKWY TO W SURF ST

1.0

50,000 04/01/08

12/01/08

0

0

300 11 / 32233

ON N CLIFTON AVE FROM W WELLINGTON AVE TO W BELMONT AVE

3.0

06/11/07

09/07/07

187,500 06/11/07

09/19/07

114,078

100

300 07 0044 / 5467

ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE

1.0

07/19/06

09/08/06

60,000 08/07/06

09/18/06

64,282

100

300 09 / 33110

ON N FREMONT ST FROM W CORNELIA AVE TO W ADDISON ST

1.0

65,000 04/01/08

12/01/08

0

0

300 11 / 32233

ON N KENMORE AVE FROM W WELLINGTON AVE TO W BELMONT AVE

3.0

187,500 06/11/07

09/19/07

114,078

100

300 11 / 32233

ON N MAGNOLIA AVE FROM W ADDISON ST TO W GRACE ST

2.0

0

0

300 09 / 33110

ON N PINE GROVE AVE FROM W DIVERSEY PKWY TO W SURF ST

1.0

0

0

300 06 / 32277

ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE

0

0

300 09 / 33110

ON N RETA AVE FROM W CORNELIA AVE TO W ADDISON ST

1.0

300 11 / 32233

ON N SEMINARY AVE FROM W WELLINGTON AVE TO W BELMONT AVE

2.0

06/11/07

300 06 / 32146

ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST

2.0

300 11 / 32233

ON W ALDINE AVE FROM N HALSTED ST TO W SCHOOL ST

.0

300 07 0044 / 5467

ON W BARRY AVE FROM N BROADWAY TO N SHERIDAN RD

2.0

300 09 / 33110

ON W BARRY AVE FROM N HALSTED ST TO N SHEFFIELD AVE

2.0

300 07 0044 / 5467

ON W BRIAR PL FROM N BROADWAY TO N SHERIDAN RD

2.0

05/01/07

07/01/07

150,000 09/25/06

300 11 / 32233

ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST

.50

06/27/07

08/03/07

18,750 06/25/07

300 09 / 33110

ON W CORNELIA AVE FROM N HALSTED ST TO N WILTON AVE

1.0

65,000 04/01/08

300 06 0298 / 5405

ON W EDDY ST FROM N RACINE AVE TO N SOUTHPORT AVE

2.0

04/01/05

05/15/05

300 05 0044 / 5159

ON W HENDERSON ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE

1.0

04/04/05

300 05 0044 / 5159

ON W MELROSE ST FROM N RACINE AVE TO N SOUTHPORT AVE

2.0

04/04/05

300 09 / 33110

ON W NEWPORT AVE FROM N HALSTED ST TO N SHEFFIELD AVE

2.0

300 05 0044 / 5159

ON W NEWPORT AVE FROM N RACINE AVE TO N SOUTHPORT AVE

2.0

04/04/05

300 07 0044 / 5467

ON W OAKDALE AVE FROM N BROADWAY TO N SHERIDAN RD

2.0

300 06 / 32277

ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE

.0

300 05 0044 / 5159

ON W ROSCOE ST FROM N RACINE AVE TO N SOUTHPORT AVE

300 05 0044 / 5159 300 11 / 32233

.0

06/11/07

09/07/07

110,000 50,000 04/01/08 05/04/08

12/31/08

12/01/08

0 65,000 04/01/08

12/01/08

0

0

09/07/07

125,000 06/11/07

09/19/07

114,078

100

10/05/07

05/29/08

394,424

0

0

06/27/07

08/03/07

42,500 06/22/07

10/10/07

33,929

100

05/01/07

07/01/07

150,000 09/25/06

107,668

95

130,000 04/01/08

12/01/08

0

0

107,669

95

10/10/07

10,885

100

12/01/08

0

0

0 04/01/05

05/20/05

107,553

100

11/18/05

80,000 10/10/05

03/10/06

61,601

100

11/18/05

150,000 09/19/05

03/10/06

115,718

100

130,000 04/01/08

12/01/08

0

0

11/18/05

150,000 10/20/05

03/10/06

115,718

100

05/01/07

07/01/07

150,000 09/25/06

107,668

95

05/04/08

12/31/08

2.0

04/04/05

11/18/05

150,000 10/17/05

ON W SCHOOL ST FROM N RACINE AVE TO N SOUTHPORT AVE

2.0

04/04/05

11/18/05

ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE

.67

07/09/07

09/07/07

300 11 / 32235

ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE

.50

07/09/07

09/07/07

300 09 / 33110

ON W SURF ST FROM N BROADWAY TO N SHERIDAN RD

2.0

0

0

0

03/10/06

115,719

100

150,000 09/22/05

03/10/06

115,719

100

30,150 07/09/07

11/02/07

18,391

100

22,500 07/09/07

11/02/07

13,725

100

80,000 04/01/08

12/01/08

0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 473

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Staggered Lighting 300 11 / 32233

ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST

.50

07/09/07

09/07/07

22,500 07/09/07

11/02/07

13,725

100

300 11 / 32235

ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST

.50

07/09/07

09/07/07

21,250 07/09/07

11/02/07

13,725

100

300 07 0044 / 5467

ON W WELLINGTON AVE FROM N BROADWAY TO N SHERIDAN RD

2.0

05/01/07

07/01/07

150,000 09/25/06

107,669

95

300 06 / 32146

3600-3800 N LAKEWOOD AVE

2.0

09/05/07

05/29/08

394,424

0

95

3,702,028

1,692,687

50.67

Totals per Residntl Staggered Lighting

Blocks

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON N JANSSEN AVE FROM W ROSCOE ST TO W ADDISON ST

300 03 0044 / 4915

ON N SHEFFIELD AVE FROM W DIVERSEY PKWY TO W BELMONT AVE

300 06 0267 / 5375

ON W CORNELIA AVE FROM N RACINE AVE TO N SOUTHPORT AVE

300 03 0044 / 4915

2.0

04/08/03

06/08/03

166,978 04/08/03

06/02/03

152,353

100

09/15/04

11/15/04

400,000 09/07/04

02/11/05

232,307

100

2.0

03/15/04

05/15/04

147,242 03/05/04

04/27/04

145,026

100

ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE

2.0

09/15/04

11/15/04

150,000 09/07/04

01/07/05

67,996

100

300 06 0069 / 5233

ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE

2.0

08/01/04

10/01/04

203,500 09/08/04

02/23/05

73,656

100

300 06 0069 / 5233

ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY

1.0

10/15/04

12/15/04

27,500 12/01/04

12/23/04

36,344

100

300 06 0276 / 5384

ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY

10/15/04

12/15/04

27,500 10/22/04

12/23/04

36,344

100

9.0

Totals per Residntl Strt Lighting/Lamps

Work Type: Strt Light Pole Painting

1,122,720

744,025

Locations

300 06 0108 / 5263

ON N ASHLAND AVE FROM W ROSCOE ST TO W ADDISON ST

19.0

10/03/03

10/05/03

4,620 10/17/03

10/18/03

4,620

100

300 06 0108 / 5263

ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST

56.0

08/03/03

08/15/03

24,400 08/04/03

08/22/03

23,671

100

300 06 0108 / 5263

42.0

08/03/03

08/15/03

21,400 08/15/03

08/22/03

8,330

100

300 05 0044 / 5159

ON N LAKE SHORE DR WEST FROM W DIVERSEY PKWY TO W BELMONT AVE ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST

300 06 0108 / 5263

ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST

300 04 0216 / 5114

29.0

04/04/05

11/18/05

6,273

6,273

100

21.50

10/01/03

10/22/03

9,520 09/20/03

09/26/03

9,520

100

ON W BELMONT AVE FROM N LINCOLN AVE TO N SOUTHPORT AVE

17.0

05/01/06

11/01/06

3,677 05/17/06

06/25/06

3,677

100

302 00 0076 / 5764

3400-3500 N CLARK ST

32.0

04/01/00

12/31/00

0

544

302 00 0076 / 5764

300-400 W DIVERSEY AVE

10.0

09/01/00

12/31/00

0

170

69,890

56,805

Totals per Strt Light Pole Painting

Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0122 / 5275

ON W BELMONT AVE FROM N HALSTED ST TO N SHEFFIELD AVE

226.50

Blocks 7.0

11/01/03

12/31/03

394,607 09/15/03

06/15/04

501,452

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 474

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

1057 W BELMONT AVE

Work Type: Underpass Lighting 300 06 0217 / 5337

1057 W BELMONT AVE

Lamps 1,855.0

03/01/04

12/01/04

9,646 11/02/06

11/27/06

20,201

100

06/23/04

06/24/04

1,180 06/16/04

06/16/04

681

100

Fixtures 21.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 475

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: New Signal

Locations

210 06 0171 / 4420

N HALSTED ST AND W WAVELAND AVE

.50

08/01/06

04/01/07

108,000 04/25/07

210 06 0171 / 4420

N LINCOLN AVE AND W SCHOOL ST

.50

08/02/07

09/20/07

57,120 04/19/07

1.0

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477

W DIVERSEY PKWY AND N SHERIDAN RD

Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276

W DIVERSEY PKWY AND N SHEFFIELD AVE

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N ASHLAND AVE AND W SCHOOL ST

Work Type: Signals 300 06 0096 / 5258

1057 W BELMONT AVE

Work Type: TSM Install

05/24/07

165,120

53,026

100

91,967

85

144,993

Locations 6.0

11/06/06

09/20/07

8,700 11/08/06

04/01/07

02/28/08

5,760

11/22/06

4,911

100

0

0

Installations .0

Crossings 1.0

4,000 12/10/01

01/18/02

9,284

100

0 10/07/03

10/14/03

6,483

100

Intersections 41.0

11/15/03

11/21/03

Locations

210 06 0020 / 4295

N BROADWAY AND W CORNELIA AVE

02/01/01

03/15/01

67,500 02/14/01

04/20/01

38,582

100

210 06 0020 / 4295

W BARRY AVE AND N SHERIDAN RD

01/25/00

03/15/00

153,466 01/26/00

02/29/00

100,439

100

814 06 0134 / 16348

3000 N HALSTED ST

1.0

04/08/93

04/08/93

0 04/08/93

04/08/93

112,423

100

271 00 0045 / 4794

3500 N HALSTED ST

1.0

0 08/01/97

08/15/99

201,000

210 06 0019 / 4294

3800 N SOUTHPORT AVE

1.0

290,000 07/20/99

02/06/00

239,714

100

814 06 0390 / 16578

800 W BELMONT AVE

1.0

0 07/06/95

07/06/95

149,081

100

07/06/95

07/06/95

4.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 05 0044 / 5159

ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST

300 06 0108 / 5263

N HALSTED ST AND W DIVERSEY AVE

Totals per Traffic Equipment Painting Totals per Traffic Totals per Construction Phase

510,966

841,239

Locations 24.0

24.0

04/04/05

11/18/05

10,238

10,238

04/01/05

04/10/05

1,260

0

11,498

10,238

706,044

1,017,148

6,323,121

4,373,103

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 476

1/1/2008 AND 12/31/2008

Ward 44 Thomas M. Tunney CIP/CPM Number Totals for Ward 44

Street Address

No of Units

Start

WIP Estimate End

Cost 6,332,721

Start

WIP Actual (to Date) End

Cost 4,381,108

% Cmplt

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 477

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0274 / 5382

ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST

.0

07/01/04

12/31/04

0 03/22/05

10/05/05

3,567

100

300 06 0308 / 5414

ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

283

100

210 06 0127 / 4386

N AUSTIN AVE AND W FOSTER AVE

1.0

12/15/05

03/15/06

0 12/15/05

02/14/06

940

100

210 06 0127 / 4386

N CICERO AVE AND W LAWRENCE AVE

.0

12/15/05

03/15/06

0

0

0

0

4,790

Totals per Design/Engineering

1.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 478

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

302 00 0092 / 5774

ON N LAVERGNE AVE FROM W IRVING PARK RD TO N DICKINSON AVE

7.0

03/02/02

03/02/02

1,470 02/28/02

02/28/02

1,421

100

302 00 0092 / 5774

4000 N LAPORTE AVE

4.0

03/03/02

03/03/02

840 02/28/02

02/28/02

812

100

302 00 0092 / 5774

4900 W BELLE PLAINE AVE

5.0

03/03/02

03/03/02

1,050 02/28/02

02/28/02

1,015

100

Totals per 250 Watt Changeout Totals per Lighting/Electrical

16.0

3,360

3,248

2,073,493

1,836,301

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 479

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0846 / 7032

4816 N AVONDALE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0847 / 7033

4830 N AVONDALE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0848 / 7034

4846 N AVONDALE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0811 / 6997

5851 N CENTRAL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0397 / 6583

4337 N CICERO AVE

1.0

05/21/96

05/21/96

0 05/21/96

05/21/96

300

100

805 06 1088 / 7274

4588 N ELSTON AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0651 / 6837

5901 N ELSTON AVE

1.0

01/25/96

01/25/96

0 01/25/96

01/25/96

300

100

805 06 1159 / 7345

4336 N KEDVALE AVE

1.0

04/03/96

04/03/96

0 04/03/96

04/03/96

300

100

805 06 1183 / 7369

4505 N KEOKUK AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2031 / 8217

4463 N KILDARE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0358 / 6544

4635 N LECLAIRE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1965 / 8151

4831 N LIPPS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 2093 / 8279

4835 N LIPPS AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1854 / 8040

4607 N LOWELL AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1881 / 8067

5011 N MAJOR AVE

1.0

09/11/96

09/11/96

0 09/11/96

09/11/96

300

100

805 06 1824 / 8010

5553 N MC VICKER AVE

1.0

12/12/96

12/12/96

0 12/12/96

12/12/96

300

100

805 06 1842 / 8028

5723 N MC VICKER AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1822 / 8008

6036 N MENARD AVE

1.0

08/01/96

08/01/96

0 08/01/96

08/01/96

300

100

805 06 1924 / 8110

4307 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 1942 / 8128

4411 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 1963 / 8149

4441 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 1944 / 8130

4659 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

300 06 0139 / 5289

4849 N MILWAUKEE AVE

2,061.0

03/01/06

09/01/06

47,298 05/20/06

06/01/06

62,271

100

302 00 0092 / 5774

4849 N MILWAUKEE AVE

13.0

0 01/25/01

01/18/02

3,063

100

805 06 1945 / 8131

5119 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 1946 / 8132

5147 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 1947 / 8133

6349 N MILWAUKEE AVE

1.0

06/24/96

06/24/96

0 06/24/96

06/24/96

300

100

805 06 0884 / 7070

4907 W BERTEAU AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1070 / 7256

5351 W DEVON AVE

1.0

11/13/96

11/13/96

0 11/13/96

11/13/96

300

100

805 06 1704 / 7890

5921 W GIDDINGS ST

1.0

06/23/97

06/23/97

0 06/23/97

06/23/97

300

100

302 00 0092 / 5774

5931 W GIDDINGS ST

1.0

0 06/14/01

06/14/01

236

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 480

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1189 / 7375

4710 W HUTCHINSON ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0318 / 6504

5850 W LAWRENCE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0333 / 6519

4359 W LELAND AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0334 / 6520

5901 W LELAND AVE

1.0

09/25/96

09/25/96

0 09/25/96

09/25/96

300

100

805 06 0528 / 6714

5811 W PETERSON AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

5205 N MILWAUKEE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4849 N MILWAUKEE AVE

Work Type: Ornamental Lighting 300 06 0157 / 5297

5100 N MILWAUKEE AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

5205 N MILWAUKEE AVE

Work Type: Residntl Staggered Lighting

2,108.0

47,298

Lamps 2,320.0

06/01/07

12/31/07

68,300 09/01/07

09/21/07

68,300

100

0 04/20/02

04/23/02

38,874

100

0 03/08/99

05/20/99

45,516

Installations 2,135.0

Blocks 1.0

Lamps .0

03/01/08

12/01/08

04/04/05

11/18/05

0

0

0

Blocks

300 09 / 33111

ON N LARAMIE AVE FROM W ARGYLE ST TO W CARMEN AVE

2.0

300 05 0045 / 5160

ON N LIEB AVE FROM W GETTYSBURG ST TO N LONG AVE

1.0

300 09 / 33111

ON N LINDER AVE FROM W BALMORAL AVE TO W CATALPA AVE

2.0

300 05 0045 / 5160

ON N LONG AVE FROM W GETTYSBURG ST TO N LIEB AVE

1.0

04/04/05

11/18/05

300 05 0045 / 5160

ON W AINSLIE ST FROM N MENARD AVE TO N MARMORA AVE

2.0

04/04/05

11/18/05

300 06 0298 / 5405

ON W ARDMORE AVE FROM N MELVINA AVE TO N AUSTIN AVE

2.0

300 05 0045 / 5160

ON W STRONG ST FROM N MENARD AVE TO N MARMORA AVE

2.0

04/04/05

300 05 0045 / 5160

ON W SUNNYSIDE AVE FROM N KOSTNER AVE TO N LOWELL AVE

2.0

300 07 0045 / 5468

ON W SUNNYSIDE AVE FROM N LINDER AVE TO N CENTRAL AVE

300 06 0308 / 5414

ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE

300 07 0045 / 5468

ON W SUNNYSIDE AVE FROM N LOWELL AVE TO N KOSTNER AVE

Totals per Residntl Staggered Lighting

75,470

20,000 04/01/08

12/01/08

0

0

75,000 09/12/05

11/04/05

37,904

100

20,000 04/01/08

12/01/08

0

0

75,000 09/12/05

11/04/05

37,904

100

100,000 07/12/05

09/22/05

70,482

100

0 07/27/05

10/03/05

94,527

100

11/18/05

100,000 07/12/05

09/22/05

70,482

100

04/04/05

11/18/05

100,000 09/01/05

10/19/05

69,763

100

1.0

04/15/07

05/15/07

50,000 10/25/06

04/06/07

0

100

2.0

03/16/06

12/31/06

221,872 10/25/06

12/29/06

119,086

100

.0

03/01/06

12/31/06

0

0

0

761,872

500,148

17.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 481

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 06 0235 / 5349

ON N LAVERGNE AVE FROM W MONTROSE AVE TO W WILSON AVE

2.0

06/15/03

08/15/03

144,200 06/06/03

07/24/03

151,269

100

300 06 0267 / 5375

ON W WILSON AVE FROM N LAVERGNE AVE TO N LECLAIRE AVE

2.0

08/01/04

10/01/04

150,872 07/22/04

09/16/04

138,802

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

5025 N LARAMIE AVE

Work Type: Strt Light Pole Painting

4.0

295,072

Locations 0 03/14/01

1.0

ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MENARD AVE

15.0

09/01/00

12/31/00

300 04 0216 / 5114

ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MILWAUKEE AVE

34.0

05/01/06

11/01/06

Work Type: Strt Lighting

03/14/01

378

07/24/06

7,354

100

Locations

302 00 0076 / 5764

Totals per Strt Light Pole Painting

290,071

49.0

0 7,354 05/17/06

255

7,354

100

7,609

Blocks

300 06 0246 / 5356

ON N LARNED AVE FROM N LIEB AVE TO N LYNCH AVE

1.0

08/01/04

12/01/04

157,142 10/27/04

03/24/06

83,659

100

300 06 0246 / 5356

ON N LAVERGNE AVE FROM W WINNEMAC AVE TO W ARGYLE ST

.50

08/01/04

12/01/04

157,143 10/27/04

03/24/06

83,659

100

300 06 0246 / 5356

ON N LAVERGNE AVE FROM W WINONA ST TO W CARMEN AVE

.50

05/01/04

12/31/04

157,143 10/27/04

03/24/06

83,659

100

300 06 0274 / 5382

ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST

1.0

04/20/06

05/16/06

75,000 04/20/06

05/16/06

61,256

100

300 06 0246 / 5356

ON W ARDMORE AVE FROM N MILTIMORE AVE TO N MILWAUKEE AVE

2.0

08/01/04

12/01/04

157,143 10/27/04

03/24/06

83,659

100

300 06 0246 / 5356

ON W CATALPA AVE FROM N CENTRAL AVE TO N LOTUS AVE

1.50

08/01/04

12/01/04

157,143 10/27/04

03/24/06

83,659

100

6.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

4849 N MILWAUKEE AVE

860,714

479,551

Lamps 2,532.0

03/01/04

12/01/04

13,166 11/15/06

11/27/06

27,573

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 482

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

805 06 2304 / 8490

5152 N CENTRAL AVE

0 07/05/96

07/05/96

16,500

100

302 00 0070 / 5758

4450 N CICERO AVE

0 06/12/97

06/19/97

16,511

100

302 00 0070 / 5758

4500 N CICERO AVE

0 06/12/97

06/19/97

4,554

100

805 06 2167 / 8353

4505 N CICERO AVE

14.0

06/19/97

06/19/97

0 06/19/97

06/19/97

10,500

100

805 06 2170 / 8356

4505 N CICERO AVE

13.0

06/19/97

06/19/97

0 06/19/97

06/19/97

9,750

100

805 06 2657 / 8843

4830 N CICERO AVE

18.0

07/09/93

07/09/93

0 07/09/93

07/09/93

13,500

100

805 06 2566 / 8752

5290 N ELSTON AVE

28.0

03/27/95

03/27/95

0 03/27/95

03/27/95

21,000

100

805 06 2441 / 8627

5688 N FOREST GLEN AVE

12.0

09/12/95

09/12/95

0 09/12/95

09/12/95

9,000

100

300 06 0217 / 5337

4849 N MILWAUKEE AVE

291.0

06/25/04

07/07/04

16,357 06/17/04

06/25/04

17,312

100

805 06 2567 / 8753

5000 N MILWAUKEE AVE

42.0

04/25/95

04/25/95

0 04/25/95

04/25/95

31,500

100

805 06 2326 / 8512

4905 W AINSLIE ST

10.0

05/07/96

05/07/96

0 05/07/96

05/07/96

7,500

100

805 06 2877 / 9063

5201 W AINSLIE ST

10.0

05/04/94

05/04/94

0 05/04/94

05/04/94

7,500

100

805 06 2330 / 8516

4901 W ARGYLE ST

9.0

04/28/96

04/28/96

0 04/28/96

04/28/96

6,750

100

805 06 2303 / 8489

5001 W CARMEN AVE

10.0

05/07/96

05/07/96

0 05/07/96

05/07/96

7,500

100

805 06 2435 / 8621

5099 W FOSTER AVE

14.0

05/22/92

05/22/92

0 05/22/92

05/22/92

10,500

100

302 00 0070 / 5758

5700 W FOSTER AVE

0 05/22/97

05/29/97

13,414

100

805 06 2162 / 8348

5751 W FOSTER AVE

22.0

05/29/97

05/29/97

0 05/29/97

05/29/97

16,500

100

805 06 2672 / 8858

4801 W LAWRENCE AVE

20.0

11/15/94

11/15/94

0 11/15/94

11/15/94

15,000

100

805 06 2241 / 8427

4901 W LAWRENCE AVE

14.0

09/16/96

09/16/96

0 09/16/96

09/16/96

10,500

100

805 06 2878 / 9064

5150 W LAWRENCE AVE

12.0

03/24/94

03/24/94

0 03/24/94

03/24/94

9,000

100

805 06 2909 / 9095

4701 W MONTROSE AVE

10.0

05/29/92

05/29/92

0 05/29/92

05/29/92

7,500

100

302 00 0071 / 5759

4740 W MONTROSE AVE

0 05/12/99

05/19/99

13,772

100

805 06 2371 / 8557

4810 W WILSON AVE

14.0

09/14/95

09/14/95

0 09/14/95

09/14/95

10,500

100

805 06 2372 / 8558

4810 W WILSON AVE

18.0

09/14/95

09/14/95

0 09/14/95

09/14/95

13,500

100

Totals per Underpass Lighting

22.0

603.0

07/05/96

07/05/96

16,357

299,563

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 483

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install 210 06 0130 / 4389

N AUSTIN AVE AND N ELSTON AVE

Work Type: Left Turn Arrow

Locations 1.0

0 11/05/02

11/05/02

8,539

100

75,000 03/30/06

08/15/06

80,221

100

Locations

210 06 0127 / 4386

N AUSTIN AVE AND W FOSTER AVE

1.0

210 06 0127 / 4386

N CICERO AVE AND W LAWRENCE AVE

.50

300 06 0199 / 5324

W MONTROSE AVE AND N LARAMIE AVE

.50

11/01/01

11/28/01

3,078 11/07/01

210 06 0074 / 4338

4800 W LAWRENCE AVE

1.0

02/01/03

03/01/03

50,000 01/16/03

Totals per Left Turn Arrow

Work Type: New Signal 210 06 0075 / 4339

300 06 0096 / 5258 Totals per Traffic

4849 N MILWAUKEE AVE

11/01/06

47,500

3.0

0

0

11/08/01

4,980

100

01/30/03

65,766

100

175,578

150,967

Locations

W MONTROSE AVE AND N KNOX AVE

Work Type: Signals

10/01/06

09/01/04

11/01/04

90,500 07/26/04

07/07/05

114,304

100

11/15/03

11/25/03

0 10/01/03

10/08/03

10,120

100

Intersections 64.0

341,078

1,975,281

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 484

1/1/2008 AND 12/31/2008

Ward 45 Patrick J. Levar CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: TSM Install

Locations

210 06 0072 / 4336

W GRACE ST AND N LARAMIE AVE

.50

02/12/01

04/12/01

75,000 02/01/01

04/02/01

72,768

100

814 06 0363 / 16555

5600 N CENTRAL AVE

1.0

08/06/97

09/02/97

0 08/06/97

09/02/97

115,183

100

814 06 0202 / 16414

3800 N CICERO AVE

1.0

08/21/90

08/21/90

0 08/21/90

08/21/90

95,000

100

814 06 0226 / 16438

4000 N CICERO AVE

1.0

08/21/90

08/21/90

0 08/21/90

08/21/90

37,173

100

814 06 0225 / 16437

4200 N CICERO AVE

1.0

09/07/90

09/07/90

0 09/07/90

09/07/90

37,173

100

814 06 0173 / 16385

4400 N CICERO AVE

1.0

09/11/90

09/11/90

0 09/11/90

09/11/90

95,000

100

814 06 0222 / 16434

5200 N CICERO AVE

1.0

02/07/92

02/07/92

0 02/07/92

02/07/92

40,173

100

814 06 0280 / 16492

5200 N ELSTON AVE

1.0

10/28/91

10/28/91

0 10/28/91

10/28/91

134,857

100

814 06 0163 / 16375

5770 N FOREST GLEN AVE

1.0

12/03/91

12/03/91

0 12/03/91

12/03/91

96,000

100

814 06 0109 / 16324

4400 N KILBOURN AVE

1.0

07/29/94

07/29/94

0 07/29/94

07/29/94

59,132

100

814 06 0339 / 16538

4400 N KOSTNER AVE

1.0

03/09/92

03/09/92

0 03/09/92

03/09/92

73,893

100

814 06 0157 / 16371

4400 N LARAMIE AVE

1.0

09/15/92

09/15/92

0 09/15/92

09/15/92

95,000

100

814 06 0171 / 16383

5199 N LARAMIE AVE

1.0

02/10/92

02/10/92

0 02/10/92

02/10/92

96,000

100

814 06 0172 / 16384

5199 N LECLAIRE AVE

1.0

02/19/92

02/19/92

0 02/19/92

02/19/92

96,000

100

814 06 0170 / 16382

5200 N LONG AVE

1.0

02/18/92

02/18/92

0 02/18/92

02/18/92

96,000

100

814 06 0167 / 16379

5750 W FOSTER AVE

1.0

02/14/92

02/14/92

0 02/14/92

02/14/92

96,000

100

814 06 0379 / 16569

6400 W HIGGINS AVE

1.0

03/01/97

03/01/97

0 03/01/97

04/01/97

136,000

100

814 06 0179 / 16391

4730 W WILSON AVE

1.0

11/04/92

11/04/92

0 11/04/92

11/04/92

105,000

100

814 06 0178 / 16390

4770 W WILSON AVE

1.0

10/22/93

10/22/93

0 10/22/93

10/22/93

115,000

100

18.50

75,000

1,691,352

Totals per Construction Phase

2,414,571

3,811,582

Totals for Ward 45

2,414,571

3,816,372

Totals per TSM Install

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 485

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

3,010

100

300 06 / 32146

ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE

.0

05/01/07

10/31/07

3,900 07/13/07

08/20/07

3,500

100

300 06 / 32146

ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE

.0

05/01/07

10/31/07

3,900 07/02/07

08/10/07

2,000

100

210 06 0023 / 4298

N BROADWAY AND W MONTROSE AVE

1.0

02/06/02

04/02/02

5,000 02/06/02

07/26/06

3,760

100

300 06 0292 / 5399

4258 N BROADWAY

1.0

1,000 03/02/05

08/24/05

747

100

300 06 0292 / 5399

4700 N MARINE DR

1.0

2,000 01/05/05

03/14/05

1,197

100

Totals per Design/Engineering

3.0

01/31/05

02/25/05

15,800

14,214

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 486

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 06 0122 / 5275

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

Totals per Lighting/Electrical

Fixtures 8.82

12/15/03

12/21/03

3,528 12/09/03 5,495,724

12/14/03

2,563 5,111,611

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 487

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1296 / 7482

4819 N ASHLAND AVE

302 00 0083 / 5768

4839 N ASHLAND AVE

805 06 1300 / 7486

4839 N ASHLAND AVE

302 00 0083 / 5768

4857 N ASHLAND AVE

805 06 1305 / 7491

4857 N ASHLAND AVE

302 00 0083 / 5768

4879 N ASHLAND AVE

805 06 1281 / 7467

4879 N ASHLAND AVE

302 00 0083 / 5768

4913 N ASHLAND AVE

805 06 1284 / 7470

4913 N ASHLAND AVE

302 00 0083 / 5768

5013 N ASHLAND AVE

805 06 1286 / 7472

5013 N ASHLAND AVE

302 00 0083 / 5768

5043 N ASHLAND AVE

805 06 1287 / 7473

5043 N ASHLAND AVE

1.0

12/05/97

805 06 0819 / 7005

4449 N BROADWAY

1.0

300 06 0096 / 5258

4544 N BROADWAY

575.0

302 00 0092 / 5774

4544 N BROADWAY

11.0

302 00 0083 / 5768

4821 N CLARK ST

805 06 1285 / 7471

4921 N CLARK ST

302 00 0083 / 5768

5044 N CLARK ST

805 06 1288 / 7474

5044 N CLARK ST

302 00 0083 / 5768

5050 N CLARK ST

805 06 1289 / 7475

5050 N CLARK ST

302 00 0084 / 5769

4519 N DOVER ST

805 06 1337 / 7523

4519 N DOVER ST

302 00 0084 / 5769

4529 N DOVER ST

805 06 1338 / 7524

4529 N DOVER ST

302 00 0084 / 5769

4553 N DOVER ST

805 06 1343 / 7529

4553 N DOVER ST

302 00 0084 / 5769

4601 N DOVER ST

805 06 1344 / 7530

4601 N DOVER ST

302 00 0084 / 5769

4641 N DOVER ST

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

266

100

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

266

100

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

266

100

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

267

100

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

267

100

0 12/05/97

12/05/97

300

100

0 12/04/97

12/04/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

03/01/03

09/01/03

15,019 03/01/06

09/01/06

17,373

0

0 01/16/01

01/16/02

2,592

100

0 11/18/97

11/18/97

266

100

0 12/05/97

12/05/97

300

100

0 11/18/97

11/18/97

266

100

0 12/05/97

12/05/97

300

100

0 11/18/97

11/18/97

266

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 488

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 1324 / 7510

4641 N DOVER ST

302 00 0084 / 5769

4751 N DOVER ST

805 06 1315 / 7501

4751 N DOVER ST

302 00 0084 / 5769

4755 N DOVER ST

805 06 1318 / 7504

4755 N DOVER ST

302 00 0084 / 5769

4000 N KENMORE AVE

805 06 1383 / 7569

4000 N KENMORE AVE

302 00 0084 / 5769

4012 N KENMORE AVE

805 06 1385 / 7571

4012 N KENMORE AVE

302 00 0084 / 5769

4022 N KENMORE AVE

805 06 1387 / 7573

4022 N KENMORE AVE

302 00 0084 / 5769

4026 N KENMORE AVE

805 06 1389 / 7575

4026 N KENMORE AVE

302 00 0084 / 5769

4030 N KENMORE AVE

805 06 1390 / 7576

4030 N KENMORE AVE

302 00 0084 / 5769

4048 N KENMORE AVE

805 06 1392 / 7578

4048 N KENMORE AVE

302 00 0084 / 5769

4058 N KENMORE AVE

805 06 1395 / 7581

4058 N KENMORE AVE

302 00 0084 / 5769

4068 N KENMORE AVE

805 06 1366 / 7552

4068 N KENMORE AVE

302 00 0084 / 5769

4124 N KENMORE AVE

805 06 1369 / 7555

4124 N KENMORE AVE

302 00 0084 / 5769

4126 N KENMORE AVE

805 06 1370 / 7556

4126 N KENMORE AVE

302 00 0084 / 5769

4130 N KENMORE AVE

805 06 1371 / 7557

4130 N KENMORE AVE

302 00 0084 / 5769

4132 N KENMORE AVE

805 06 1372 / 7558

4132 N KENMORE AVE

302 00 0084 / 5769

4146 N KENMORE AVE

805 06 1373 / 7559

4146 N KENMORE AVE

Installations 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/08/98

06/08/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/15/98

06/15/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 489

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 302 00 0084 / 5769

4148 N KENMORE AVE

805 06 1375 / 7561

4148 N KENMORE AVE

302 00 0084 / 5769

4218 N KENMORE AVE

805 06 1376 / 7562

4218 N KENMORE AVE

302 00 0084 / 5769

4228 N KENMORE AVE

805 06 1377 / 7563

4228 N KENMORE AVE

302 00 0084 / 5769

4305 N KENMORE AVE

805 06 1378 / 7564

4305 N KENMORE AVE

302 00 0084 / 5769

4306 N KENMORE AVE

805 06 1379 / 7565

4306 N KENMORE AVE

302 00 0084 / 5769

4326 N KENMORE AVE

805 06 1380 / 7566

4326 N KENMORE AVE

302 00 0084 / 5769

4342 N KENMORE AVE

805 06 1351 / 7537

4342 N KENMORE AVE

302 00 0084 / 5769

4347 N KENMORE AVE

805 06 1352 / 7538

4347 N KENMORE AVE

302 00 0084 / 5769

4353 N KENMORE AVE

805 06 1353 / 7539

4353 N KENMORE AVE

302 00 0084 / 5769

4621 N KENMORE AVE

805 06 1349 / 7535

4621 N KENMORE AVE

302 00 0084 / 5769

4631 N KENMORE AVE

805 06 1321 / 7507

4631 N KENMORE AVE

302 00 0084 / 5769

4721 N KENMORE AVE

805 06 1331 / 7517

4721 N KENMORE AVE

302 00 0084 / 5769

4722 N KENMORE AVE

805 06 1334 / 7520

4722 N KENMORE AVE

302 00 0084 / 5769

4730 N KENMORE AVE

805 06 1335 / 7521

4730 N KENMORE AVE

302 00 0084 / 5769

4741 N KENMORE AVE

805 06 1311 / 7497

4741 N KENMORE AVE

302 00 0084 / 5769

4758 N KENMORE AVE

Installations 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/22/98

06/22/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/25/98

06/25/98

275

100

0 12/05/97

12/05/97

300

100

0 06/29/98

06/29/98

275

100

0 12/05/97

12/05/97

300

100

0 06/29/98

06/29/98

275

100

0 12/05/97

12/05/97

300

100

0 06/29/98

06/29/98

275

100

0 12/05/97

12/05/97

300

100

0 06/29/98

06/29/98

275

100

0 12/05/97

12/05/97

300

100

0 06/29/98

06/29/98

275

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 490

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 1292 / 7478

4758 N KENMORE AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1148 / 7334

4801 N KENMORE AVE

1.0

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

805 06 1176 / 7362

4801 N KENMORE AVE

1.0

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

302 00 0084 / 5769

4817 N KENMORE AVE

0 06/29/98

06/29/98

275

100

805 06 1295 / 7481

4817 N KENMORE AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4859 N KENMORE AVE

0 06/29/98

06/29/98

275

100

805 06 1276 / 7462

4859 N KENMORE AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4419 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1359 / 7545

4419 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4453 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1363 / 7549

4453 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4541 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1340 / 7526

4541 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4639 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1323 / 7509

4639 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4715 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1329 / 7515

4715 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4719 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1330 / 7516

4719 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4749 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1313 / 7499

4749 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4755 N MAGNOLIA AVE

0 07/07/98

07/07/98

275

100

805 06 1319 / 7505

4755 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

4816 N MAGNOLIA AVE

0 11/24/97

11/24/97

266

100

805 06 1294 / 7480

4816 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

4834 N MAGNOLIA AVE

0 11/24/97

11/24/97

266

100

805 06 1299 / 7485

4834 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

4850 N MAGNOLIA AVE

0 11/24/97

11/24/97

266

100

805 06 1303 / 7489

4850 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

4872 N MAGNOLIA AVE

0 11/24/97

11/24/97

267

100

805 06 1279 / 7465

4872 N MAGNOLIA AVE

0 12/05/97

12/05/97

300

100

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 491

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 302 00 0083 / 5768

4886 N MAGNOLIA AVE

805 06 1282 / 7468

4886 N MAGNOLIA AVE

302 00 0084 / 5769

4400 N MALDEN ST

805 06 1354 / 7540

4400 N MALDEN ST

302 00 0084 / 5769

4401 N MALDEN ST

805 06 1356 / 7542

4401 N MALDEN ST

302 00 0084 / 5769

4418 N MALDEN ST

805 06 1358 / 7544

4418 N MALDEN ST

302 00 0084 / 5769

4425 N MALDEN ST

805 06 1360 / 7546

4425 N MALDEN ST

302 00 0084 / 5769

4436 N MALDEN ST

805 06 1361 / 7547

4436 N MALDEN ST

302 00 0084 / 5769

4516 N MALDEN ST

805 06 1365 / 7551

4516 N MALDEN ST

302 00 0084 / 5769

4530 N MALDEN ST

805 06 1339 / 7525

4530 N MALDEN ST

302 00 0084 / 5769

4552 N MALDEN ST

805 06 1341 / 7527

4552 N MALDEN ST

302 00 0084 / 5769

4602 N MALDEN ST

805 06 1345 / 7531

4602 N MALDEN ST

302 00 0084 / 5769

4615 N MALDEN ST

805 06 1346 / 7532

4615 N MALDEN ST

302 00 0084 / 5769

4616 N MALDEN ST

805 06 1348 / 7534

4616 N MALDEN ST

302 00 0084 / 5769

4626 N MALDEN ST

805 06 1350 / 7536

4626 N MALDEN ST

302 00 0084 / 5769

4637 N MALDEN ST

805 06 1322 / 7508

4637 N MALDEN ST

302 00 0084 / 5769

4642 N MALDEN ST

805 06 1325 / 7511

4642 N MALDEN ST

302 00 0084 / 5769

4703 N MALDEN ST

Installations 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0 11/24/97

11/24/97

267

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/13/98

07/13/98

275

100

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 492

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 1326 / 7512

4703 N MALDEN ST

302 00 0084 / 5769

4721 N MALDEN ST

805 06 1332 / 7518

4721 N MALDEN ST

302 00 0084 / 5769

4736 N MALDEN ST

805 06 1308 / 7494

4736 N MALDEN ST

302 00 0084 / 5769

4741 N MALDEN ST

805 06 1312 / 7498

4741 N MALDEN ST

302 00 0084 / 5769

4752 N MALDEN ST

805 06 1316 / 7502

4752 N MALDEN ST

302 00 0084 / 5769

4755 N MALDEN ST

805 06 1320 / 7506

4755 N MALDEN ST

302 00 0084 / 5769

4401 N RACINE AVE

805 06 1357 / 7543

4401 N RACINE AVE

302 00 0084 / 5769

4007 N SHERIDAN RD

805 06 1384 / 7570

4007 N SHERIDAN RD

302 00 0084 / 5769

4013 N SHERIDAN RD

805 06 1386 / 7572

4013 N SHERIDAN RD

302 00 0084 / 5769

4024 N SHERIDAN RD

805 06 1388 / 7574

4024 N SHERIDAN RD

302 00 0084 / 5769

4046 N SHERIDAN RD

805 06 1391 / 7577

4046 N SHERIDAN RD

302 00 0084 / 5769

4056 N SHERIDAN RD

805 06 1394 / 7580

4056 N SHERIDAN RD

302 00 0084 / 5769

4072 N SHERIDAN RD

805 06 1367 / 7553

4072 N SHERIDAN RD

302 00 0084 / 5769

4106 N SHERIDAN RD

805 06 1368 / 7554

4106 N SHERIDAN RD

302 00 0084 / 5769

4445 N SHERIDAN RD

805 06 1362 / 7548

4445 N SHERIDAN RD

302 00 0084 / 5769

4500 N SHERIDAN RD

805 06 1364 / 7550

4500 N SHERIDAN RD

Installations 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

0 12/05/97

12/05/97

300

100

0 07/16/98

07/16/98

275

100

0 12/05/97

12/05/97

300

100

0 07/20/98

07/20/98

275

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

276

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

275

100

0 12/05/97

12/05/97

300

100

0 07/27/98

07/27/98

275

100

0 12/05/97

12/05/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 493

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0675 / 6861

4518 N SHERIDAN RD

302 00 0084 / 5769

4552 N SHERIDAN RD

805 06 1342 / 7528

4552 N SHERIDAN RD

1.0

12/05/97

805 06 0462 / 6648

4801 N WINTHROP AVE

1.0

805 06 0479 / 6665

4801 N WINTHROP AVE

1.0

302 00 0084 / 5769

4802 N WINTHROP AVE

805 06 1293 / 7479

4802 N WINTHROP AVE

302 00 0084 / 5769

4824 N WINTHROP AVE

805 06 1297 / 7483

4824 N WINTHROP AVE

302 00 0084 / 5769

4825 N WINTHROP AVE

805 06 1298 / 7484

4825 N WINTHROP AVE

302 00 0084 / 5769

1.0

0 06/01/95

06/01/95

300

100

0 07/27/98

07/27/98

275

100

12/05/97

0 12/05/97

12/05/97

300

100

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

0 08/17/98

08/17/98

275

100

0 12/05/97

12/05/97

300

100

0 08/17/98

08/17/98

275

100

0 12/05/97

12/05/97

300

100

0 08/17/98

08/17/98

275

100

0 12/05/97

12/05/97

300

100

4828 N WINTHROP AVE

0 08/17/98

08/17/98

275

100

302 00 0084 / 5769

4839 N WINTHROP AVE

0 08/17/98

08/17/98

275

100

805 06 1301 / 7487

4839 N WINTHROP AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1304 / 7490

4852 N WINTHROP AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4853 N WINTHROP AVE

0 08/17/98

08/17/98

275

100

302 00 0084 / 5769

4861 N WINTHROP AVE

0 08/17/98

08/17/98

275

100

805 06 1278 / 7464

4861 N WINTHROP AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

4875 N WINTHROP AVE

0 08/17/98

08/17/98

275

100

805 06 1280 / 7466

4875 N WINTHROP AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 0781 / 6967

830 W AGATITE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

302 00 0084 / 5769

935 W AGATITE AVE

0 08/25/98

08/25/98

276

100

805 06 1222 / 7408

935 W AGATITE AVE

0 12/05/97

12/05/97

300

100

302 00 0084 / 5769

945 W AGATITE AVE

0 08/25/98

08/25/98

276

100

805 06 1225 / 7411

945 W AGATITE AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 0861 / 7047

620 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0829 / 7015

622 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0874 / 7060

640 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0845 / 7031

660 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0820 / 7006

680 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0821 / 7007

720 W BITTERSWEET PL

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

1.0

1.0

1.0

1.0

1.0

06/01/95

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

06/01/95

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 494

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 0822 / 7008

740 W BITTERSWEET PL

302 00 0083 / 5768

1249 W CARMEN AVE

805 06 1442 / 7628

1249 W CARMEN AVE

302 00 0083 / 5768

1309 W CARMEN AVE

805 06 1445 / 7631

1309 W CARMEN AVE

302 00 0083 / 5768

1333 W CARMEN AVE

805 06 1451 / 7637

1333 W CARMEN AVE

302 00 0084 / 5769

1345 W CARMEN AVE

805 06 1453 / 7639

1345 W CARMEN AVE

302 00 0084 / 5769

950 W CUYLER AVE

805 06 1226 / 7412

950 W CUYLER AVE

302 00 0084 / 5769

960 W CUYLER AVE

805 06 1227 / 7413

960 W CUYLER AVE

302 00 0084 / 5769

970 W CUYLER AVE

805 06 1230 / 7416

970 W CUYLER AVE

302 00 0084 / 5769

911 W EASTWOOD AVE

805 06 1221 / 7407

911 W EASTWOOD AVE

302 00 0084 / 5769

803 W LAKESIDE PL

805 06 1245 / 7431

803 W LAKESIDE PL

302 00 0084 / 5769

839 W LAKESIDE PL

805 06 1217 / 7403

839 W LAKESIDE PL

302 00 0084 / 5769

855 W LAKESIDE PL

805 06 1220 / 7406

855 W LAKESIDE PL

302 00 0084 / 5769

937 W LAKESIDE PL

805 06 1223 / 7409

937 W LAKESIDE PL

302 00 0084 / 5769

827 W LELAND AVE

805 06 1216 / 7402

827 W LELAND AVE

302 00 0084 / 5769

845 W LELAND AVE

805 06 1219 / 7405

845 W LELAND AVE

302 00 0084 / 5769

937 W LELAND AVE

805 06 1224 / 7410

937 W LELAND AVE

Installations 1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

1.0

06/01/95

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

06/01/95

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0 06/01/95

06/01/95

300

100

0 09/02/97

09/02/97

266

100

0 12/05/97

12/05/97

300

100

0 09/02/97

09/02/97

266

100

0 12/05/97

12/05/97

300

100

0 09/02/97

09/02/97

266

100

0 12/05/97

12/05/97

300

100

0 08/25/98

08/25/98

276

100

0 12/05/97

12/05/97

300

100

0 08/25/98

08/25/98

276

100

0 12/05/97

12/05/97

300

100

0 08/25/98

08/25/98

276

100

0 12/05/97

12/05/97

300

100

0 08/25/98

08/25/98

276

100

0 12/05/97

12/05/97

300

100

0 09/09/98

09/09/98

276

100

0 12/05/97

12/05/97

300

100

0 09/09/98

09/09/98

276

100

0 12/05/97

12/05/97

300

100

0 09/09/98

09/09/98

276

100

0 12/05/97

12/05/97

300

100

0 09/09/98

09/09/98

276

100

0 12/05/97

12/05/97

300

100

0 09/09/98

09/09/98

276

100

0 12/05/97

12/05/97

300

100

0 09/14/98

09/14/98

276

100

0 12/05/97

12/05/97

300

100

0 09/14/98

09/14/98

276

100

0 12/05/97

12/05/97

300

100

0 09/14/98

09/14/98

276

100

0 12/05/97

12/05/97

300

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 495

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

302 00 0084 / 5769

960 W LELAND AVE

0 09/14/98

09/14/98

276

100

805 06 1228 / 7414

960 W LELAND AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 0509 / 6695

732 W WAVELAND AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

302 00 0083 / 5768

1238 W WINONA ST

0 09/02/97

09/02/97

267

100

805 06 1441 / 7627

1238 W WINONA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1258 W WINONA ST

0 09/02/97

09/02/97

267

100

805 06 1444 / 7630

1258 W WINONA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1312 W WINONA ST

0 09/02/97

09/02/97

267

100

805 06 1448 / 7634

1312 W WINONA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1332 W WINONA ST

0 09/02/97

09/02/97

267

100

805 06 1450 / 7636

1332 W WINONA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1340 W WINONA ST

0 09/02/97

09/02/97

267

100

805 06 1452 / 7638

1340 W WINONA ST

0 12/05/97

12/05/97

300

100

302 00 0083 / 5768

1346 W WINONA ST

0 09/02/97

09/02/97

266

100

805 06 1454 / 7640

1346 W WINONA ST

0 12/05/97

12/05/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

4544 N BROADWAY

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4544 N BROADWAY

Work Type: Flood Light Install

1.0

1.0

1.0

1.0

1.0

1.0

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

724.0

15,019

95,015

Lamps 1,228.0

06/01/07

12/31/07

36,152 08/01/07

08/17/07

36,152

100

0 04/08/02

04/11/02

20,612

100

Installations 1,132.0

Fixtures

300 06 0167 / 5306

4700 N MAGNOLIA AVE

7.0

0 10/13/99

10/13/99

1,152

100

300 06 0167 / 5306

801 W SHERIDAN RD

1.0

0 08/16/99

08/16/99

351

100

8.0

0

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 300 06 0292 / 5399

4700 N MARINE DR

1,503

Installations .0

07/22/05

02/17/06

13,602 07/22/06

09/22/06

8,177

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 496

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 05 0046 / 5161

ON N CLARENDON AVE FROM W WILSON AVE TO W WINDSOR AVE

300 06 0122 / 5275

ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD

300 07 0046 / 5469

ON W WAVELAND AVE FROM N LAKE SHORE DR WEST TO N BROADWAY

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

4544 N BROADWAY

Work Type: Residntl Staggered Lighting

Fixtures 2.0

2.0

04/04/05

11/18/05

15,000 06/20/05

06/24/05

9,992

100

11/01/04

11/30/04

48,250 10/01/04

11/01/04

30,189

100

08/01/06

08/10/06

135,000 08/14/06

09/20/06

77,358

100

4.0

198,250

117,539

0

0

0

Lamps .0

03/01/08

12/01/08

Blocks

300 06 0308 / 5414

ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE

2.0

06/12/06

08/25/06

119,285 07/21/06

09/28/06

72,126

100

300 07 0046 / 5469

ON N FREMONT ST FROM W SHERIDAN RD TO W IRVING PARK RD

1.0

07/24/06

09/29/06

85,000 03/26/07

07/13/07

47,349

100

300 07 0046 / 5469

ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE

1.0

08/07/06

10/06/06

72,500 11/02/06

04/16/07

48,783

100

300 09 / 33112

ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE

4.0

300 11 / 32235

ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

2.0

04/01/08

06/02/08

72,500 10/29/07

300 11 / 32237

ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

2.0

04/01/08

06/02/08

300 11 / 32235

ON N RACINE AVE FROM W WILSON AVE TO W LELAND AVE

1.0

12/07/07

03/14/08

300 05 0046 / 5161

ON W BRADLEY PL FROM N HALSTED ST TO N FREMONT ST

1.0

09/25/05

300 05 0046 / 5161

ON W BROMPTON AVE FROM N BROADWAY TO N HALSTED ST

1.0

300 11 / 32233

ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST

300 07 0046 / 5469

20,000

0

0

04/18/08

59,547

100

55,000 10/29/07

04/18/08

45,000

100

45,000 12/07/07

04/25/08

34,455

100

11/18/05

85,000 10/12/05

12/09/05

39,287

100

10/15/05

11/18/05

85,000 10/12/05

12/09/05

39,287

100

.50

06/27/07

08/03/07

18,750 06/25/07

10/10/07

10,885

100

ON W DAKIN ST FROM N BROADWAY TO N SHERIDAN RD

2.0

07/24/06

09/29/06

150,000 03/26/07

07/13/07

95,643

100

300 06 0298 / 5405

ON W GRACE ST FROM N HALSTED ST TO N LAKE SHORE DR WEST

2.0

06/01/05

07/01/05

0 06/20/05

08/05/05

80,715

100

300 07 0046 / 5469

ON W SHERIDAN RD FROM N FREMONT ST TO N LAKE SHORE DR WEST

3.0

07/24/06

09/26/06

165,000 03/26/07

07/13/07

95,436

100

300 11 / 32233

ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE

.33

07/09/07

09/07/07

14,850 07/09/07

11/02/07

9,058

100

300 11 / 32235

ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE

.50

07/09/07

09/07/07

22,500 07/09/07

11/02/07

13,725

100

300 06 / 32146

ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE

.0

10/05/07

03/31/08

300 11 / 32233

ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST

.50

07/09/07

09/07/07

300 11 / 32235

ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST

.50

07/09/07

09/07/07

300 06 / 32146

ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE

2.0

11/05/07

04/29/08

300 07 0046 / 5469

ON W WINNEMAC AVE FROM N CLARK ST TO N ASHLAND AVE

1.0

08/14/06

09/15/06

50,000 11/10/06

300 07 0046 / 5469

ON W WINONA ST FROM N BROADWAY TO N GLENWOOD AVE

2.0

08/07/06

10/06/06

140,000 11/10/06

Totals per Residntl Staggered Lighting

29.33

328,000

0

99

22,500 07/09/07

11/02/07

13,725

100

21,250 07/09/07

11/02/07

13,725

100

328,000

1,900,135

0

98

04/16/07

18,365

100

04/16/07

97,625

100

834,734

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 497

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Blocks

Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375

ON N HAZEL ST FROM W BUENA AVE TO W MONTROSE AVE

2.0

07/01/04

08/15/04

160,902 07/06/04

11/12/04

131,497

100

300 06 0069 / 5233

ON N JANSSEN AVE FROM W ARGYLE ST TO W AINSLIE ST

1.0

10/15/03

01/15/04

40,000 10/14/03

12/05/03

38,748

100

300 03 0046 / 4917

ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD

4.0

12/15/04

03/01/05

251,000 12/06/04

05/27/05

193,741

100

300 06 0069 / 5233

ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE

2.96

10/15/03

01/15/04

162,800 10/14/03

12/05/03

120,013

100

300 06 0276 / 5384

ON W BELLE PLAINE AVE FROM N CLARENDON AVE TO N BROADWAY

11/15/04

12/15/04

60,000 12/06/04

03/15/05

53,453

100

302 00 0092 / 5774

ON W BITTERSWEET PL FROM N CLARENDON AVE TO N MARINE DR

2.0

01/10/03

03/10/03

129,000 01/17/03

03/13/03

125,221

100

300 03 0046 / 4917

ON W BUENA AVE FROM N CLARENDON AVE TO N HAZEL ST

1.0

07/06/04

09/06/04

80,000 07/06/04

11/05/04

68,072

100

302 00 0092 / 5774

ON W BUENA AVE FROM N CLARENDON AVE TO N MARINE DR

2.0

12/04/02

02/15/03

90,000 12/04/02

02/11/03

84,108

100

300 06 0069 / 5233

ON W BUENA AVE FROM N SHERIDAN RD TO N BROADWAY

1.0

11/01/03

12/01/03

50,000 10/21/03

01/20/04

28,162

100

300 03 0046 / 4917

ON W CORNELIA AVE FROM N BROADWAY TO N LAKE SHORE DR

1.0

10/15/04

12/15/04

110,000 10/22/04

12/23/04

85,812

100

300 06 0069 / 5233

ON W CULLOM AVE FROM N BROADWAY TO N HAZEL ST

1.0

11/15/03

12/15/03

63,000 10/21/03

01/20/04

77,152

100

300 03 0046 / 4917

ON W CUYLER AVE FROM N BROADWAY TO N SHERIDAN RD

1.0

11/01/04

12/15/04

100,000 12/15/04

03/01/05

85,372

100

302 00 0092 / 5774

ON W EASTWOOD AVE FROM N CLARENDON AVE TO N SHERIDAN RD

2.0

03/01/03

05/01/03

105,000 04/01/03

06/15/03

135,719

100

300 06 0235 / 5349

ON W GORDON TER FROM N MARINE DR TO N CLARENDON AVE

1.0

06/15/03

08/15/03

76,427 06/16/03

08/14/03

65,281

100

300 03 0046 / 4917

ON W HUTCHINSON AVE FROM N MARINE DR TO N HAZEL ST

2.0

07/06/04

09/06/04

150,000 07/06/04

11/05/04

114,363

100

300 03 0046 / 4917

ON W JUNIOR TER FROM N CLARENDON AVE TO N HAZEL ST

1.0

07/06/04

09/06/04

75,000 07/06/04

11/05/04

53,740

100

300 06 0235 / 5349

ON W JUNIOR TER FROM N MARINE DR TO N CLARENDON AVE

1.0

06/15/03

08/15/03

76,427 06/16/03

08/14/03

65,281

100

300 06 0069 / 5233

ON W LAKESIDE PL FROM N SHERIDAN RD TO N CLARENDON AVE

2.0

07/27/03

10/15/03

134,000 07/27/03

11/07/03

108,601

100

302 00 0092 / 5774

ON W LELAND AVE FROM N CLARENDON AVE TO N SHERIDAN RD

2.0

02/15/03

04/15/03

118,500 02/14/03

05/21/03

109,284

100

300 06 0069 / 5233

ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY

1.0

10/15/04

12/15/04

27,500 12/01/04

12/23/04

36,344

100

300 06 0276 / 5384

ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY

10/15/04

12/15/04

27,500 10/22/04

12/23/04

36,344

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Residntl Strt Lighting/Lamps 300 06 0122 / 5275

ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD

30.96

2,087,056

1,816,307

Locations 12/01/04

01/31/05

124,000 12/06/04

05/20/05

124,000

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 498

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

1020 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1023 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1241 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1434 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

4.0

0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting

1,512

Locations

302 00 0076 / 5764

ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE

11.0

05/05/98

05/21/98

0 05/05/98

05/21/98

187

100

300 06 0058 / 5229

ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE

50.49

09/20/02

10/20/02

11,550 09/20/02

10/30/02

11,550

100

300 06 0108 / 5263

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

11.34

03/01/04

03/10/04

3,346 04/12/04

05/07/04

2,773

100

Totals per Strt Light Pole Painting

72.83

14,896

14,510

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 499

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting

Blocks

302 00 0091 / 5773

ON N BEACON ST FROM W LAWRENCE AVE TO W WILSON AVE

78,249 08/20/01

01/29/02

74,660

100

302 00 0088 / 5770

ON N HAZEL ST FROM W MONTROSE AVE TO W WILSON AVE

0 06/23/97

02/25/98

67,521

100

302 00 0089 / 5771

ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE

0 09/11/98

09/28/99

250,573

100

302 00 0091 / 5773

ON N MAGNOLIA AVE FROM W LAWRENCE AVE TO W WILSON AVE

2.0

10/01/01

12/30/01

77,590 10/12/01

01/14/02

73,083

100

302 00 0091 / 5773

ON N MALDEN ST FROM W LAWRENCE AVE TO W WILSON AVE

2.0

10/01/01

12/30/01

76,368 08/27/01

01/29/02

71,495

100

302 00 0089 / 5771

ON N PINE GROVE AVE FROM W ADDISON ST TO W SHERIDAN RD

0

40,000

100

302 00 0088 / 5770

ON W AGATITE AVE FROM N CLARENDON AVE TO N SHERIDAN RD

0

67,521

100

302 00 0089 / 5771

ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE

0 04/16/99

06/24/99

0

100

302 00 0088 / 5770

ON W ARGYLE ST FROM N GLENWOOD AVE TO N CLARK ST

0 06/03/98

06/18/98

67,521

100

302 00 0091 / 5773

ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE

.50

491 02/13/01

02/13/01

193

100

302 00 0091 / 5773

ON W CARMEN AVE FROM N BROADWAY TO N GLENWOOD AVE

3.0

11/02/00

03/15/01

72,300 11/08/00

02/27/01

97,891

100

302 00 0091 / 5773

ON W CARMEN AVE FROM N GLENWOOD AVE TO N CLARK ST

1.0

11/01/00

12/04/00

60,700 11/01/00

12/04/00

77,631

100

302 00 0088 / 5770

ON W LELAND AVE FROM N RACINE AVE TO N BEACON ST

0 12/30/97

09/30/98

67,521

100

302 00 0088 / 5770

ON W SUNNYSIDE AVE FROM N CLARENDON AVE TO N SHERIDAN RD

0

67,522

100

302 00 0088 / 5770

ON W WINDSOR AVE FROM N CLARENDON AVE TO N SHERIDAN RD

0

67,522

100

302 00 0088 / 5770

ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE

0 01/07/98

06/08/98

33,761

100

302 00 0091 / 5773

ON W WINNEMAC AVE FROM N CLARK ST TO N GLENWOOD AVE

57,700 09/17/01

02/07/02

61,166

100

302 00 0088 / 5770

ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST

0 04/07/98

06/03/98

33,761

100

302 00 0091 / 5773

4400-4500 N BEACON ST

2.0

100,000 06/28/01

12/10/01

119,477

100

302 00 0091 / 5773

4400 N CLIFTON AVE

1.0

45,000 05/22/01

08/14/01

69,934

100

302 00 0090 / 5772

4600 N CLIFTON AVE

78,895 11/15/99

02/15/00

60,000

100

302 00 0089 / 5771

3900-3931 N FREMONT ST

0 10/01/98

09/27/99

99,386

100

302 00 0091 / 5773

4800 N KENMORE AVE

1.0

80,000 07/23/01

02/07/02

82,981

100

302 00 0091 / 5773

4400-4500 N MAGNOLIA AVE

2.0

100,000 05/03/01

09/11/01

60,217

100

302 00 0091 / 5773

4400-4500 N MALDEN ST

2.0

100,000 05/10/01

01/29/02

59,819

100

302 00 0091 / 5773

4400 N RACINE AVE

1.0

50,000 04/03/01

08/14/01

45,801

100

302 00 0089 / 5771

4800-4899 N WINTHROP AVE

0 04/23/99

06/17/99

0

100

302 00 0091 / 5773

900 W BELLE PLAINE AVE

1.0

42,000 06/14/01

09/11/01

60,848

100

302 00 0091 / 5773

900 W GORDON TER

1.0

42,000 06/26/01

09/11/01

39,393

100

302 00 0091 / 5773

1200 W SUNNYSIDE AVE

1.0

25,000 05/22/01

08/14/01

2,599

100

Totals per Strt Lighting

2.0

1.0

09/01/01

10/01/01

11/01/99

23.50

04/03/01

11/01/01

12/30/01

12/30/01

02/15/00

12/03/01

12/30/01

1,086,293

1,919,797

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 500

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

4544 N BROADWAY

Work Type: Underpass Lighting

Lamps 1,500.0

03/01/04

12/01/04

7,800 11/02/06

11/28/06

16,335

100

Fixtures

300 06 0217 / 5337

4544 N BROADWAY

160.0

07/08/04

07/14/04

8,993 06/25/04

06/29/04

6,856

100

805 06 2297 / 8483

4698 N BROADWAY

20.0

10/02/96

10/02/96

0 10/02/96

10/02/96

15,000

100

805 06 2740 / 8926

555 W IRVING PARK DR

31.0

11/01/94

11/01/94

0 11/01/94

11/01/94

23,250

100

805 06 2674 / 8860

1195 W LELAND AVE

19.0

12/14/94

12/14/94

0 12/14/94

12/14/94

14,250

100

805 06 2687 / 8873

1199 W LELAND AVE

21.0

07/01/94

07/01/94

0 07/01/94

07/01/94

15,750

100

805 06 2395 / 8581

1039 W MONTROSE AVE

4.0

07/19/95

07/19/95

0 07/19/95

07/19/95

3,000

100

805 06 2737 / 8923

620 W MONTROSE DR

27.0

12/14/94

12/14/94

0 12/14/94

12/14/94

20,250

100

805 06 2182 / 8368

1129 W WILSON AVE

6.0

12/31/95

12/31/95

0 12/31/95

12/31/95

4,500

100

Totals per Underpass Lighting

288.0

8,993

102,856

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 501

1/1/2008 AND 12/31/2008

Ward 46 Helen Shiller CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 0023 / 4298

N BROADWAY AND W MONTROSE AVE

Work Type: New Signal 210 06 0171 / 4420

N HALSTED ST AND W WAVELAND AVE

Work Type: Pedestrian Countdown Signal Install 300 11 / 32235

W GRACE ST AND N HALSTED ST

300 06 0166 / 5305

wo#10720180 Note Last Updated on 07-MAR-08 4900 N GLENWOOD AVE

Totals per Pedestrian Countdown Signal Install

Work Type: Signals 300 06 0096 / 5258

4544 N BROADWAY

Work Type: TSM Install

Locations 1.0

07/01/06

09/30/06

55,000

0

08/01/06

04/01/07

108,000 04/25/07

05/24/07

53,026

100

12.0

12/05/07

12/09/07

18,000 12/07/07

12/11/07

0

100

1.0

07/11/00

07/11/00

8,000 07/11/00

07/11/00

7,224

100

Locations .50

Locations

13.0

26,000

7,224

Intersections 38.0

11/20/03

11/25/03

0 09/20/06

09/26/06

6,009

100

Locations

210 06 0020 / 4295

N BROADWAY AND W CORNELIA AVE

02/01/01

03/15/01

67,500 02/14/01

04/20/01

38,582

100

210 06 0020 / 4295

W FOSTER AVE AND N GLENWOOD AVE

01/15/01

03/15/01

65,450 12/09/99

02/11/00

50,081

100

210 06 0019 / 4294

W MONTROSE AVE AND N HAZEL ST

1.0

05/16/00

06/30/00

150,000 07/09/98

04/06/00

92,244

100

814 06 0372 / 16562

4700 N BROADWAY

1.0

03/08/96

03/08/96

0 03/08/96

03/08/96

159,145

100

271 00 0045 / 4794

4400 N MARINE DR

1.0

0 08/01/97

08/15/99

201,000

814 06 0140 / 16354

4000 N SHERIDAN RD

0 07/06/93

07/06/93

111,966

1.0 4.0

07/06/93

07/06/93

282,950

653,018

471,950

719,277

Totals per Construction Phase

5,967,674

5,830,887

Totals for Ward 46

5,983,474

5,845,101

Totals per TSM Install Totals per Traffic

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 502

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD

.0

02/01/06

07/31/06

0 02/01/06

09/28/06

27

100

300 06 / 32275

ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE

.0

03/01/07

10/31/07

3,900 03/06/07

04/03/07

2,365

100

300 05 0047 / 5162

ON N BELL AVE FROM W LAWRENCE AVE TO W ARGYLE ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N CAMPBELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 / 32277

ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST

.0

04/01/08

08/30/08

0

0

0

300 05 0047 / 5162

ON N GREENVIEW AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N HERMITAGE AVE FROM W GRACE ST TO W IRVING PARK RD

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N HERMITAGE AVE FROM W IRVING PARK RD TO W BERTEAU AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N HERMITAGE AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N HOYNE AVE FROM W GRACE ST TO W BYRON ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N HOYNE AVE FROM W LAWRENCE AVE TO W ARGYLE ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 0308 / 5414

ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD

.0

02/01/06

07/31/06

0 02/01/06

07/31/06

27

100

300 06 / 32275

ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE

.0

03/01/07

10/31/07

3,900 02/02/07

03/15/07

2,365

100

300 05 0047 / 5162

ON N LINCOLN AVE FROM W LELAND AVE TO W LAWRENCE AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N MAPLEWOOD AVE FROM W MONTROSE AVE TO W WILSON AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 / 32277

ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST

.0

04/01/08

08/30/08

0

0

0

300 05 0047 / 5162

ON N OAKLEY AVE FROM W LAWRENCE AVE TO W AINSLIE ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N SEELEY AVE FROM W CORNELIA AVE TO W ADDISON ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON N WOLCOTT AVE FROM W BERTEAU AVE TO W CULLOM AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 / 32277

ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE

.0

04/01/08

08/30/08

0

0

0

300 05 0047 / 5162

ON W ARGYLE ST FROM N DAMEN AVE TO N LEAVITT ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W ARGYLE ST FROM N LINCOLN AVE TO N ROCKWELL ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 06 / 32277

ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE

.0

04/01/08

08/30/08

0

0

0

300 05 0047 / 5162

ON W BELLE PLAINE AVE FROM N DAMEN AVE TO N LINCOLN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W BERTEAU AVE FROM N LINCOLN AVE TO N LEAVITT ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W BRADLEY PL FROM N WOLCOTT AVE TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W BYRON ST FROM N CLAREMONT AVE TO N WESTERN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W CARMEN AVE FROM N LEAVITT ST TO N OAKLEY AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W CORNELIA AVE FROM N DAMEN AVE TO N LEAVITT ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W CULLOM AVE FROM N DAMEN AVE TO N LINCOLN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 503

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 05 0047 / 5162

ON W CUYLER AVE FROM N WOLCOTT AVE TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W EASTWOOD AVE FROM N CAMPBELL AVE TO N ROCKWELL ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W EASTWOOD AVE FROM N ROCKWELL ST TO N VIRGINIA AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W EASTWOOD AVE FROM N SEELEY AVE TO N HAMILTON AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W GRACE ST FROM N RAVENSWOOD TO N LINCOLN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W LELAND AVE FROM N WESTERN AVE TO N WASHTENAW AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W PENSACOLA AVE FROM N DAMEN AVE TO N HOYNE AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WARNER AVE FROM N LINCOLN AVE TO N LEAVITT ST

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WARNER AVE FROM N WESTERN AVE TO N CAMPBELL AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WAVELAND AVE FROM N LINCOLN AVE TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WAVELAND AVE FROM N WOLCOTT AVE TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WILSON AVE FROM N WESTERN AVE TO N VIRGINIA AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WINNEMAC AVE FROM N RAVENSWOOD TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

ON W WINONA ST FROM N LEAVITT ST TO N OAKLEY AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

210 06 0243 / 4480

N DAMEN AVE AND W LAWRENCE AVE

.0

12/26/06

01/26/07

500 12/26/06

01/26/07

1,275

100

300 05 0047 / 5162

N GREENVIEW AVE AND W LELAND AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

210 06 0205 / 4448

W ADDISON ST AND N WOLCOTT AVE

.0

07/01/04

12/01/04

0 07/01/04

12/01/04

2,531

100

300 06 0292 / 5399

4700 N CLARK ST

4,000 04/12/05

05/12/05

0

100

300 05 0047 / 5162

4632 N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

4700 N DAMEN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

210 06 0106 / 4366

4800 N OAKLEY AVE

.0

07/27/00

10/17/00

0 07/27/00

10/17/00

1,817

100

300 05 0047 / 5162

3800 N WESTERN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

4132 N WESTERN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

4700 N WESTERN AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

300 05 0047 / 5162

4800 N WOLCOTT AVE

.0

07/17/06

07/30/06

0 07/17/06

07/30/06

0

0

Totals per Design/Engineering

1.0

1.0

12,300

10,407

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 504

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0307 / 5413

ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE

Work Type: 400 Watt Changeout

Fixtures 8.50

02/21/06

05/31/06

3,400 01/16/05

02/10/06

2,113

100

Fixtures

300 03 0047 / 4918

ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE

42.0

11/01/04

11/20/04

16,800 10/01/04

10/15/04

16,114

100

300 03 0047 / 4918

ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE

18.0

11/01/04

11/20/04

7,200 10/01/04

10/15/04

7,092

100

300 03 0047 / 4918

ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE

5.0

11/01/04

11/20/04

2,000 10/01/04

10/15/04

2,087

100

300 03 0040 / 4911

ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE

12.25

08/20/04

09/20/04

4,900 07/14/04

08/10/04

3,202

100

300 03 0047 / 4918

ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE

9.0

11/01/04

11/20/04

1,200 10/01/04

10/15/04

2,417

100

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

26.40

08/20/04

09/20/04

10,560 07/14/04

08/10/04

6,901

100

300 03 0047 / 4918

ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE

18.0

11/01/04

11/20/04

7,200 10/01/04

10/15/04

5,167

100

300 03 0040 / 4911

ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE

5.92

08/20/04

09/20/04

2,368 07/14/04

08/10/04

1,547

100

300 03 0047 / 4918

ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE

40.0

11/01/04

11/20/04

16,000 10/01/04

10/15/04

16,276

100

300 09 / 33113

4832-4900 N LINCOLN AVE

2.0

02/01/08

12/31/08

800 08/28/08

08/29/08

0

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

178.57

69,028

60,803

1,308,235

1,335,264

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 505

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0739 / 6925

4520 N ARTESIAN AVE

1.0

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

805 06 0740 / 6926

4532 N ARTESIAN AVE

1.0

11/27/96

11/27/96

0 11/27/96

11/27/96

300

100

805 06 0726 / 6912

4551 N ARTESIAN AVE

1.0

09/30/96

09/30/96

0 09/30/96

09/30/96

300

100

805 06 1799 / 7985

3949 N ASHLAND AVE

1.0

04/11/97

04/11/97

0 04/11/97

04/11/97

300

100

302 00 0083 / 5768

4814 N ASHLAND AVE

0 12/04/97

12/04/97

266

100

302 00 0083 / 5768

5054 N ASHLAND AVE

0 12/04/97

12/04/97

266

100

805 06 1290 / 7476

5054 N ASHLAND AVE

1.0

12/05/97

12/05/97

0 12/05/97

12/05/97

300

100

805 06 1591 / 7777

4617 N CLARK ST

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

300 06 0139 / 5289

4237 N LINCOLN AVE

1,208.0

03/01/06

09/01/06

31,905 05/20/06

06/01/06

36,498

100

302 00 0092 / 5774

4237 N LINCOLN AVE

14.0

0 01/16/01

12/12/01

3,299

100

805 06 0596 / 6782

5136 N OAKLEY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0588 / 6774

5142 N OAKLEY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0544 / 6730

3900 N PAULINA ST

1.0

01/17/96

01/17/96

0 01/17/96

01/17/96

300

100

805 06 0545 / 6731

4140 N PAULINA ST

1.0

08/16/96

08/16/96

0 08/16/96

08/16/96

300

100

805 06 0655 / 6841

3946 N SOUTHPORT AVE

1.0

12/05/96

12/05/96

0 12/05/96

12/05/96

300

100

805 06 0465 / 6651

4515 N WOLCOTT AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1731 / 7917

1923 W GRACE ST

1.0

05/30/97

05/30/97

0 05/30/97

05/30/97

300

100

805 06 1193 / 7379

2140 W IRVING PARK RD

1.0

01/30/97

01/30/97

0 01/30/97

01/30/97

300

100

805 06 0329 / 6515

2200 W LAWRENCE AVE

1.0

11/15/96

11/15/96

0 11/15/96

11/15/96

300

100

805 06 0330 / 6516

2204 W LAWRENCE AVE

1.0

11/06/96

11/06/96

0 11/06/96

11/06/96

300

100

805 06 0331 / 6517

1761 W LELAND AVE

1.0

11/27/96

11/27/96

0 11/27/96

11/27/96

300

100

805 06 1954 / 8140

2213 W MONTROSE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0456 / 6642

2219 W WILSON AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

4237 N LINCOLN AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

4237 N LINCOLN AVE

1,241.0

31,905

46,029

Lamps 1,496.0

06/01/07

12/31/07

44,042 07/31/07

08/17/07

44,042

100

0 04/16/02

04/19/02

25,510

100

Installations 1,401.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 506

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 09 / 33113

4500 N LINCOLN AVE

1.0

09/08/08

09/10/08

500 09/08/08

09/10/08

500

100

300 11 / 32236

4740 N WESTERN AVE

2.0

10/01/07

10/01/07

1,000 10/01/07

10/01/07

941

100

302 00 0092 / 5774

1332 W IRVING PARK RD

1.0

0 03/26/01

03/26/01

471

100

302 00 0092 / 5774

1822 W LARCHMONT AVE

1.0

0 06/29/01

06/29/01

471

100

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting

5.0

1,500

2,383

Fixtures

300 03 0047 / 4918

ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE

33.0

11/01/04

11/20/04

44,550 11/01/04

11/20/04

35,004

100

300 03 0047 / 4918

ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE

14.0

11/01/04

11/20/04

18,900 11/01/04

11/20/04

14,673

100

300 11 / 32222

ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST

11.55

11/01/07

12/01/07

15,725 03/13/08

04/04/08

13,060

100

300 03 0047 / 4918

ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE

3.0

11/01/04

11/20/04

4,050 11/01/04

11/20/04

3,307

100

300 03 0047 / 4918

ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE

34.0

11/01/04

11/20/04

45,900 11/01/04

11/20/04

37,296

100

300 09 / 33113

4832-4900 N LINCOLN AVE

2.0

02/01/08

12/31/08

2,700 08/28/08

08/29/08

0

100

Totals per Ornamental - Piggyback Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

4237 N LINCOLN AVE

97.55

131,825

103,340

0

0

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 507

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 05 0047 / 5162

ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD

.0

08/01/06

09/15/06

25,000 08/01/06

09/15/06

0

100

300 06 0308 / 5414

ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD

1.0

03/16/06

09/28/06

90,005 07/31/06

09/28/06

59,380

100

300 06 / 32275

ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE

1.0

04/01/07

12/31/07

104,140 03/27/07

08/03/07

60,317

100

300 06 / 32277

ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON N CLAREMONT AVE FROM W WILSON AVE TO W SUNNYSIDE AVE

1.0

05/10/05

06/25/05

0 05/02/05

06/06/05

300 05 0047 / 5162

ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD

.0

08/01/06

09/15/06

25,000 08/01/06

300 06 0308 / 5414

ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD

1.0

09/01/06

09/28/06

90,005 07/31/06

300 06 / 32275

ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE

1.0

04/01/07

12/31/07

104,140 03/28/07

300 06 / 32277

ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON N OAKLEY AVE FROM W WILSON AVE TO W SUNNYSIDE AVE

1.0

05/10/05

06/20/05

0 05/02/05

300 06 / 32277

ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE

.0

05/04/08

12/31/08

300 06 / 32277

ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE

.0

05/04/08

12/31/08

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps

6.0

0

0

66,931

100

09/15/06

0

100

09/28/06

59,380

100

08/03/07

60,317

100

0

0

66,931

100

0

0

0

0

0

0

438,290

373,256

06/06/05

Blocks

300 06 0267 / 5375

ON N LEAVITT ST FROM W ARGYLE ST TO W FOSTER AVE

2.0

05/26/04

07/26/04

159,200 05/06/04

07/14/04

153,257

100

300 06 0235 / 5349

ON N WASHTENAW AVE FROM W LELAND AVE TO W GIDDINGS ST

1.0

05/10/03

07/10/03

67,031 05/08/03

07/03/03

62,697

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl

3.0

226,231

215,954

Locations

302 00 0092 / 5774

1510 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1522 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1532 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1534 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

302 00 0092 / 5774

1546 W LELAND AVE

1.0

0 01/23/01

01/23/01

378

100

5.0

0

Totals per Short Arm Installs - Residntl

1,890

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 508

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting

Locations

300 03 0047 / 4918

ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE

46.0

11/01/04

11/20/04

13,550 10/01/04

10/20/04

10,630

100

300 03 0047 / 4918

ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE

20.0

11/01/04

11/20/04

5,750 10/01/04

10/20/04

5,335

100

300 03 0047 / 4918

ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE

5.50

11/01/04

11/20/04

1,750 10/01/04

10/20/04

1,298

100

300 03 0040 / 4911

ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE

11.34

05/10/04

09/10/04

3,112 05/10/04

08/01/04

3,062

100

300 03 0047 / 4918

ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE

3.0

11/01/04

11/20/04

600 10/01/04

10/20/04

649

100

300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

4.95

05/15/07

06/01/07

1,089 05/15/07

06/01/07

1,089

100

300 03 0040 / 4911

ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE

25.68

05/10/04

09/10/04

7,728 05/10/04

08/01/04

6,934

100

300 03 0047 / 4918

ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE

21.50

11/01/04

11/20/04

6,500 10/01/04

10/20/04

5,101

100

300 04 0216 / 5114

ON W IRVING PARK RD FROM N DAMEN AVE TO N BELL AVE

27.0

05/01/06

11/01/06

5,768 05/17/06

08/15/06

5,768

100

300 04 0216 / 5114

ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE

12.0

05/01/06

11/01/06

2,596 05/17/06

07/25/06

2,596

100

300 03 0040 / 4911

ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE

6.29

05/10/04

09/10/04

1,924 05/10/04

08/01/04

1,698

100

300 03 0047 / 4918

ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE

60.0

11/01/04

11/20/04

17,900 10/01/04

10/20/04

14,042

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

243.26

68,266

58,201

Blocks

300 06 0247 / 5357

ON N CLAREMONT AVE FROM W HUTCHINSON ST TO W CULLOM AVE

.50

08/01/03

09/15/03

40,000 08/01/03

09/27/03

34,739

100

300 06 0247 / 5357

ON W BELLE PLAINE AVE FROM N CLARK ST TO N SOUTHPORT AVE

1.0

12/15/03

12/31/03

34,000 12/17/03

02/06/04

33,353

100

300 06 0247 / 5357

ON W HUTCHINSON ST FROM N CLAREMONT AVE TO N OAKLEY AVE

2.0

08/01/03

09/15/03

40,000 08/01/03

09/27/03

34,738

100

300 06 0076 / 5239

4643 N DAMEN AVE

06/01/00

09/15/00

58,500 02/24/99

12/30/99

66,504

100

300 06 0076 / 5239

4643 N ROCKWELL ST

06/01/00

09/15/00

58,500 02/24/99

12/30/99

66,504

100

300 06 0078 / 5241

4635 N SEELEY AVE

1.0

04/01/98

12/01/98

6,900 04/15/98

09/15/99

4,339

100

302 00 0091 / 5773

1400 W SUNNYSIDE AVE

1.0

35,000 06/25/01

10/05/01

45,581

100

5.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

4237 N LINCOLN AVE

272,900

285,758

Lamps 3,058.0

03/01/04

12/01/04

15,902 11/13/06

11/29/06

33,302

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 509

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0217 / 5337

4237 N LINCOLN AVE

88.0

07/15/04

07/20/04

4,946 06/29/04

07/02/04

6,722

100

805 06 2202 / 8388

1790 W ADDISON ST

6.0

02/14/97

02/14/97

0 02/14/97

02/14/97

4,500

100

805 06 2881 / 9067

1799 W ADDISON ST

11.0

09/25/93

09/25/93

0 09/25/93

09/25/93

8,250

100

302 00 0070 / 5758

1820 W ADDISON ST

0 02/07/97

02/14/97

6,212

100

805 06 2887 / 9073

1785 W BERTEAU AVE

6.0

12/06/93

12/06/93

0 12/06/93

12/06/93

4,500

100

805 06 2883 / 9069

1795 W GRACE ST

6.0

12/03/93

12/03/93

0 12/03/93

12/03/93

4,500

100

805 06 2885 / 9071

1785 W IRVING PARK RD

10.0

12/09/93

12/09/93

0 12/09/93

12/09/93

7,500

100

805 06 2204 / 8390

1790 W IRVING PARK RD

8.0

12/31/95

12/31/95

0 12/31/95

12/31/95

6,000

100

805 06 2866 / 9052

1785 W LAWRENCE AVE

8.0

12/02/93

12/02/93

0 12/02/93

12/02/93

6,000

100

805 06 2865 / 9051

1785 W LELAND AVE

8.0

12/10/93

12/10/93

0 12/10/93

12/10/93

6,000

100

805 06 2888 / 9074

1805 W MONTROSE AVE

8.0

12/08/93

12/08/93

0 12/08/93

12/08/93

6,000

100

805 06 2863 / 9049

1785 W SUNNYSIDE AVE

8.0

12/07/93

12/07/93

0 12/07/93

12/07/93

6,000

100

805 06 2864 / 9050

1785 W WILSON AVE

8.0

12/01/93

12/01/93

0 12/01/93

12/01/93

6,000

100

805 06 2914 / 9100

1785 W WINNEMAC AVE

6.0

12/13/93

12/13/93

0 12/13/93

12/13/93

4,500

100

Totals per Underpass Lighting

181.0

4,946

82,684

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 510

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0219 / 4459

N WESTERN AVE AND W ADDISON ST

1.0

10,563 04/05/05

04/05/05

10,084

100

210 06 0130 / 4389

N WESTERN AVE AND W AINSLIE ST

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0130 / 4389

N WESTERN AVE AND W BERTEAU AVE

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0130 / 4389

N WESTERN AVE AND W FOSTER AVE

.50

0 05/14/02

05/14/02

925

100

210 06 0219 / 4459

N WESTERN AVE AND W FOSTER AVE

.50

04/22/05

04/23/05

5,282 04/13/05

04/13/05

4,985

100

210 06 0219 / 4459

N WESTERN AVE AND W GRACE ST

1.0

04/14/05

04/15/05

10,563 04/15/05

04/15/05

8,007

100

210 06 0219 / 4459

N WESTERN AVE AND W IRVING PARK RD

1.0

04/15/05

04/16/05

10,563 04/22/05

04/22/05

11,527

100

210 06 0130 / 4389

N WESTERN AVE AND W LAWRENCE AVE

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W LAWRENCE AVE

1.0

10,563 03/01/05

03/01/05

10,084

100

210 06 0130 / 4389

N WESTERN AVE AND W LELAND AVE

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W LELAND AVE

1.0

04/19/05

04/20/05

10,563 03/01/05

03/01/05

10,388

100

210 06 0219 / 4459

N WESTERN AVE AND W MONTROSE AVE

1.0

04/16/05

04/17/05

10,563 03/03/05

03/03/05

8,007

100

210 06 0130 / 4389

N WESTERN AVE AND W SUNNYSIDE AVE

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W WILSON AVE

1.0

10,563 03/16/05

03/16/05

8,007

100

210 06 0130 / 4389

N WESTERN AVE AND W WINNEMAC AVE

.50

0 04/25/02

04/25/02

3,662

100

210 06 0130 / 4389

N WOLCOTT AVE AND W MONTROSE AVE

1.0

0 04/18/02

04/18/02

7,324

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0128 / 4387

W FOSTER AVE AND N LEAVITT ST

Work Type: New Signal

04/13/05

04/20/05

04/18/05

04/14/05

04/21/05

04/19/05

14.50

79,223

92,250

7,500

0

Locations .50

12/31/01

01/31/02

Locations

210 06 0205 / 4448

W ADDISON ST AND N WOLCOTT AVE

1.0

01/02/06

07/31/07

192,500 01/24/06

210 06 0073 / 4337

1900 W MONTROSE AVE

1.0

01/31/02

11/15/02

130,000 12/17/01

2.0

Totals per New Signal

Work Type: Pedestrian Countdown Signal Install

322,500

N DAMEN AVE AND W LAWRENCE AVE

.0

03/15/06

05/08/07

12,000 01/26/07

210 06 / 32280

W IRVING PARK RD AND N WESTERN AVE

.0

12/29/08

01/31/09

10,500

Totals per Traffic

219,904

95

136,286

100

356,190

Locations

210 06 0243 / 4480

Totals per Pedestrian Countdown Signal Install

11/29/02

.0

02/22/07

5,773

100

0

0

22,500

5,773

1,185,853

2,080,072

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 511

1/1/2008 AND 12/31/2008

Ward 47 Gene Schulter CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Installations

Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276

W ADDISON ST AND N PAULINA ST

Work Type: Signals 300 06 0096 / 5258

4.0

11/21/07

11/26/07

5,760 12/10/07

12/14/07

3,425

100

11/20/03

11/25/03

0 09/18/03

09/22/03

5,850

100

Intersections

4237 N LINCOLN AVE

Work Type: TSM Install

37.0

Locations

210 06 0183 / 4429

N WESTERN AVE AND W WAVELAND AVE

1.0

03/01/04

07/31/05

224,388 12/18/03

07/07/05

234,600

100

814 06 0135 / 16349

4800 N LEAVITT ST

1.0

07/12/93

07/12/93

0 07/12/93

07/12/93

81,947

100

814 06 0328 / 16532

3800 N LINCOLN AVE

1.0

09/01/96

09/01/96

0 09/01/96

01/06/97

60,000

100

300 06 0078 / 5241

4600 N LINCOLN AVE

1.0

04/01/98

12/01/98

31,165 11/05/99

02/01/00

31,165

100

300 06 0117 / 5271

4600 N LINCOLN AVE

1.0

12,335 11/05/99

02/01/00

0

100

814 06 0342 / 16540

5046 N LINCOLN AVE

1.0

02/10/97

02/10/97

0 02/10/97

07/22/97

200,000

100

210 06 0106 / 4366

4800 N OAKLEY AVE

1.0

11/20/00

04/15/01

146,619 11/14/00

03/07/01

158,458

100

210 06 0039 / 4309

3600 N RAVENSWOOD AVE

06/01/99

09/30/00

333,352 03/16/00

10/16/00

327,887

100

814 06 0299 / 16511

4000 N SOUTHPORT AVE

1.0

07/03/91

07/03/91

0 07/03/91

07/03/91

115,984

100

814 06 0300 / 16512

3800 N WESTERN AVE

1.0

10/25/90

10/25/90

0 10/25/90

10/25/90

86,982

100

814 06 0302 / 16514

4400 N WESTERN AVE

1.0

11/07/91

11/07/91

0 11/07/91

11/07/91

169,050

100

814 06 0197 / 16409

4800 N WOLCOTT AVE

1.0

08/14/96

08/14/96

0 08/14/96

08/14/96

150,000

100

11.0

Totals per TSM Install

Work Type: Traffic Equipment Painting 300 11 / 32190

ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE

747,859

1,616,073

Locations 1.65

05/15/07

06/01/07

512 05/15/07

06/01/07

512

Totals per Construction Phase

2,494,088

3,415,336

Totals for Ward 47

2,506,388

3,425,743

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 512

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 0308 / 5414

ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE

.0

02/01/06

07/31/06

0 02/01/06

300 06 / 32277

ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD

.0

04/01/08

08/30/08

0

300 06 / 32146

ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE

.0

05/01/07

10/31/07

3,900 06/19/07

300 06 / 32277

ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD

4.0

04/01/08

08/30/08

260,000 05/14/08

300 06 / 32146

ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY

.0

05/01/07

10/31/07

300 06 / 32146

ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY

300 06 0285 / 5393

5556 N SHERIDAN RD

281 00 / 33670

1135-1141 W GLENLAKE AVE

Totals per Design/Engineering

Work Type: Feasibility Study

07/31/06

3,123

100

0

0

07/19/07

4,811

100

0

50

5,000 07/02/07

08/15/07

4,811

100

.0

05/01/07

10/31/07

5,000 06/15/07

07/20/07

4,811

100

1.0

05/01/04

08/01/04

0 05/11/04

08/11/04

2,617

100

.0

01/01/08

12/31/08

0

0

0

273,900

20,173

5.0

Projects

302 00 0079 / 5767

ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

302 00 0079 / 5767

N LAKEWOOD AVE AND W BALMORAL AVE

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

302 00 0079 / 5767

5701 N SHERIDAN RD

.0

10/25/01

10/25/01

0 10/25/01

10/25/01

0

100

Totals per Feasibility Study Totals per Lighting/Electrical

.0

0

0

273,900

20,173

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 513

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 06 0307 / 5413

ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE

2.0

02/01/06

05/31/06

800 01/16/05

02/10/06

497

100

300 06 0307 / 5413

ON W HOOD AVE FROM N GREENVIEW AVE TO N CLARK ST

4.0

02/03/06

05/31/06

1,600 01/16/05

02/10/06

995

100

300 06 0307 / 5413

ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY

1.50

02/02/06

05/31/06

600 01/16/05

02/10/06

373

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout

7.50

3,000

1,865

Fixtures

300 06 0069 / 5233

ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE

95.16

12/02/02

12/02/02

38,064 11/30/02

11/30/02

23,398

100

300 06 0122 / 5275

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

52.29

12/15/03

12/21/03

20,916 12/09/03

12/14/03

15,193

100

300 06 0307 / 5413

ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE

.50

02/02/06

05/31/06

200 01/16/05

02/10/06

124

100

300 06 0069 / 5233

5700 N SHERIDAN RD

16.0

08/11/02

08/11/02

6,400 08/08/02

08/08/02

4,060

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

163.95

65,580

42,775

2,762,085

1,695,952

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 514

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

300 06 0096 / 5258

5533 N BROADWAY

983.0

302 00 0092 / 5774

5533 N BROADWAY

6.0

302 00 0083 / 5768

5146 N CLARK ST

805 06 1261 / 7447

5146 N CLARK ST

302 00 0084 / 5769

4735 N CLIFTON AVE

805 06 1307 / 7493

4735 N CLIFTON AVE

302 00 0084 / 5769

4751 N CLIFTON AVE

805 06 1314 / 7500

4751 N CLIFTON AVE

302 00 0084 / 5769

4755 N CLIFTON AVE

805 06 1317 / 7503

4755 N CLIFTON AVE

1.0

12/05/97

805 06 1168 / 7354

5320 N KENMORE AVE

1.0

06/01/95

302 00 0083 / 5768

4861 N MAGNOLIA AVE

805 06 1277 / 7463

4861 N MAGNOLIA AVE

1.0

12/05/97

805 06 1888 / 8074

5100 N MARINE DR

1.0

12/23/96

302 00 0084 / 5769

4705 N RACINE AVE

805 06 1327 / 7513

4705 N RACINE AVE

302 00 0084 / 5769

4721 N RACINE AVE

805 06 1333 / 7519

4721 N RACINE AVE

302 00 0084 / 5769

4731 N RACINE AVE

805 06 1306 / 7492

4731 N RACINE AVE

1.0

12/05/97

805 06 0460 / 6646

6312 N WINTHROP AVE

1.0

805 06 1125 / 7311

1040 W GRANVILLE AVE

1.0

302 00 0084 / 5769

1255 W WINNEMAC AVE

805 06 0458 / 6644

1255 W WINNEMAC AVE

1.0

06/01/95

805 06 1443 / 7629

1255 W WINNEMAC AVE

1.0

12/05/97

302 00 0084 / 5769

1311 W WINNEMAC AVE

805 06 1447 / 7633

1311 W WINNEMAC AVE

302 00 0084 / 5769

1329 W WINNEMAC AVE

805 06 1449 / 7635

1329 W WINNEMAC AVE

1.0

12/05/97

805 06 1776 / 7962

900 W WINONA ST

1.0

04/16/97

Totals per Alley Lighting/Lamps

1.0

1.0

1.0

1.0

1.0

1.0

1,006.0

03/01/03

0 03/01/06

09/01/06

29,700

0

0 01/26/01

01/29/02

1,414

100

0 11/18/97

11/18/97

267

100

0 12/05/97

12/05/97

300

100

0 06/01/98

06/01/98

275

100

0 12/05/97

12/05/97

300

100

0 06/01/98

06/01/98

275

100

0 12/05/97

12/05/97

300

100

0 06/01/98

06/01/98

275

100

12/05/97

0 12/05/97

12/05/97

300

100

06/01/95

0 06/01/95

06/01/95

300

100

0 11/24/97

11/24/97

267

100

12/05/97

0 12/05/97

12/05/97

300

100

12/23/96

0 12/23/96

12/23/96

300

100

0 07/20/98

07/20/98

275

100

0 12/05/97

12/05/97

300

100

0 07/20/98

07/20/98

275

100

0 12/05/97

12/05/97

300

100

0 07/20/98

07/20/98

275

100

12/05/97

0 12/05/97

12/05/97

300

100

11/18/96

11/18/96

0 11/18/96

11/18/96

300

100

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

0 09/30/98

09/30/98

276

100

06/01/95

0 06/01/95

06/01/95

300

100

12/05/97

0 12/05/97

12/05/97

300

100

0 09/30/98

09/30/98

276

100

0 12/05/97

12/05/97

300

100

0 09/30/98

09/30/98

276

100

12/05/97

0 12/05/97

12/05/97

300

100

04/16/97

0 04/16/97

04/16/97

300

100

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

09/01/03

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

12/05/97

0

39,226

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 515

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0238 / 5352

5533 N BROADWAY

Work Type: Arterial Strt Lighting/Lamps 300 11 / 32237

ON N BROADWAY FROM W LELAND AVE TO N RACINE AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

5533 N BROADWAY

Work Type: Flood Light Install

Lamps 968.0

06/01/07

12/31/07

28,497 08/01/07

08/17/07

28,497

100

0

0

Blocks 1.0

17,000

Installations 873.0

0 04/14/02

04/17/02

15,896

100

Fixtures

300 06 0167 / 5306

5917 N BROADWAY

2.0

0 12/10/99

12/10/99

702

100

302 00 0092 / 5774

6215 N KENMORE AVE

1.0

0 10/15/01

10/15/01

404

100

302 00 0092 / 5774

5005 N WINTHROP AVE

2.0

0 03/22/01

03/22/01

941

100

5.0

0

2,047

0

0

0

64,563

100

0

0

0

95,000

64,563

0

1,460

100

0

0

0

Totals per Flood Light Install

Work Type: Lighting Imprvmnts 281 00 / 33670

1135-1141 W GLENLAKE AVE

Work Type: Lighting Imprvmnts 300 06 0285 / 5393

5556 N SHERIDAN RD

281 00 / 33670

Project has been completed.(100%) Note Last Updated on 05-SEP-06 1135-1141 W GLENLAKE AVE

Totals per Lighting Imprvmnts

Work Type: Lighting Imprvmnts 300 06 0201 / 5325

W GRANVILLE AVE AND N WINTHROP AVE

Work Type: Loop Lighting 281 00 / 33670

1135-1141 W GLENLAKE AVE

Work Type: Ornamental Lighting 300 06 0120 / 5274

934-1200 W BRYN MAWR AVE

281 00 / 33670

1135-1141 W GLENLAKE AVE

Totals per Ornamental Lighting

Blocks .0

01/01/08

12/31/08

1.0

08/11/04

08/15/06

.0

01/01/08

12/31/08

Installations

1.0

95,000 08/23/04

05/15/06

Projects 1.0

Blocks .0

01/01/08

12/31/08

2.50

10/18/99

02/04/00

.0

01/01/08

12/31/08

Blocks

2.50

600,000 10/18/99

02/04/00

202,287

0

0

600,000

202,287

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 516

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670

1135-1141 W GLENLAKE AVE

Work Type: Residential Regrouping 300 06 0270 / 5378

5533 N BROADWAY

Work Type: Residntl Staggered Lighting

Poles .0

01/01/08

12/31/08

0

0

0

03/01/08

12/01/08

0

0

0

Lamps .0

Blocks

300 07 0046 / 5469

ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE

1.0

08/07/06

10/06/06

72,500 11/02/06

04/16/07

48,783

100

300 06 0308 / 5414

ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE

2.0

06/26/06

08/25/06

189,505 06/26/06

09/15/06

126,957

100

300 06 / 32277

ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD

.0

05/04/08

12/31/08

300 11 / 32235

ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

2.0

04/01/08

06/02/08

300 11 / 32237

ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE

2.0

04/01/08

300 06 / 32146

ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE

2.0

12/03/07

300 06 / 32277

Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway-all under same project Note Last Updated on 04-MAR-08 ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 05/04/08 12/31/08 0

300 06 0298 / 5405

ON N WINTHROP AVE FROM W THORNDALE AVE TO W GRANVILLE AVE

2.0

06/15/05

07/15/05

300 06 / 32146

ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY

1.0

12/05/07

06/18/08

300 06 / 32146 300 07 0048 / 5471

0

0

72,500 10/29/07

04/18/08

59,547

100

06/02/08

55,000 10/29/07

04/18/08

45,000

100

05/30/08

317,516 12/06/07

0

50

0

0

131,505

100

0

50

Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway- all on a single project Note Last Updated on 04-MAR-08 ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY 1.0 10/05/07 04/29/08 317,516

0

50

W WINONA ST AND N WINTHROP AVE

4,000

0

0

1,346,053

411,792

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON N WINTHROP AVE FROM W AINSLIE ST TO W WINONA ST

300 06 0069 / 5233

ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE

300 06 0267 / 5375

ON W ELMDALE AVE FROM N GLENWOOD AVE TO N BROADWAY

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Arterial 281 00 / 33670

0

1135-1141 W GLENLAKE AVE

.20

04/18/06

11/18/06

13.20

0 06/14/05

08/05/05

317,516

Blocks 2.0

05/01/03

07/01/03

201,214 04/28/03

06/27/03

179,171

100

1.04

10/15/03

01/15/04

57,200 10/14/03

12/05/03

42,167

100

2.0

08/31/04

12/15/04

149,400 08/31/04

12/03/04

153,247

100

5.04

407,814

374,585

0

0

Locations .0

01/01/08

12/31/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 517

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl

Locations

302 00 0092 / 5774

1000 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1018 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1028 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1038 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1048 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1058 W ARDMORE AVE

1.0

0 02/13/01

02/13/01

378

100

302 00 0092 / 5774

1050 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1051 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1115 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1124 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1129 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1136 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1150 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1155 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1214 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

302 00 0092 / 5774

1230 W ARGYLE ST

1.0

0 03/15/01

03/15/01

378

100

281 00 / 33670

1135-1141 W GLENLAKE AVE

302 00 0092 / 5774

1256 W VICTORIA ST

1.0

0 05/07/01

302 00 0092 / 5774

1268 W VICTORIA ST

1.0

302 00 0092 / 5774

1280 W VICTORIA ST

1.0

Totals per Short Arm Installs - Residntl

Work Type: Strt Light Pole Painting 302 00 0076 / 5764

ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE

302 00 0079 / 5767

ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST

300 06 0058 / 5229

.0

01/01/08

12/31/08

19.0

0

0

0

05/07/01

378

100

0 05/07/01

05/07/01

378

100

0 05/07/01

05/07/01

378

100

0

7,182

Locations 209.0

05/05/98

05/21/98

0 05/05/98

05/21/98

3,553

100

52.0

12/01/01

12/31/01

18,000 10/22/01

11/09/01

14,929

100

ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE

50.49

09/20/02

10/20/02

11,550 09/20/02

10/30/02

11,550

100

300 06 0108 / 5263

ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE

67.23

03/01/04

03/10/04

19,837 04/12/04

05/07/04

16,442

100

302 00 0079 / 5767

N LAKEWOOD AVE AND W BALMORAL AVE

1.0

03/15/02

06/30/02

11,200 10/22/01

11/09/01

9,953

100

302 00 0079 / 5767

5701 N SHERIDAN RD

12.0

08/01/02

08/01/02

1,500 07/25/02

08/06/02

6,020

100

300 06 0058 / 5229

1100 W CATALPA AVE

4.0

09/27/02

09/27/02

560 10/28/02

10/29/02

560

100

Totals per Strt Light Pole Painting

395.72

62,647

63,007

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 518

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0225 / 5340

4720 N BROADWAY

281 00 / 33670

1135-1141 W GLENLAKE AVE

Totals per Strt Light Pole Replacmnt/Reloc

Work Type: Strt Lighting 302 00 0092 / 5774

ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST

302 00 0089 / 5771

ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE

302 00 0091 / 5773

ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE

300 06 0076 / 5239

ON W THORNDALE AVE FROM N WINTHROP AVE TO N BROADWAY

302 00 0088 / 5770

Blocks 1.0

11/18/03

11/26/03

.0

01/01/08

12/31/08

1.0

20,000 12/04/03

02/06/04

29,059

100

0

0

0

20,000

29,059

Blocks 02/01/02

03/31/02

18,000 02/27/02

04/01/02

47,602

100

0 04/16/99

06/24/99

0

100

491 02/13/01

02/13/01

193

100

58,500 02/24/99

12/30/99

66,503

100

ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE

0 01/07/98

06/08/98

33,761

100

302 00 0088 / 5770

ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST

0 04/07/98

06/03/98

33,761

100

302 00 0091 / 5773

5700 N WINTHROP AVE

1.0

9,500 04/06/00

04/06/00

2,915

100

302 00 0091 / 5773

5700-5799 N WINTHROP AVE

1.0

9,295 02/13/01

02/13/01

0

100

.50 06/01/00

09/15/00

54.50

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

52.0

5533 N BROADWAY

95,786

184,735

Lamps 1,280.0

03/01/04

12/01/04

6,656 11/03/06

12/05/06

13,939

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 519

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0217 / 5337

5533 N BROADWAY

250.0

07/21/04

07/28/04

14,052 07/02/04

07/12/04

13,782

100

805 06 2868 / 9054

1195 W AINSLIE ST

10.0

11/11/93

11/11/93

0 11/11/93

11/11/93

7,500

100

805 06 2873 / 9059

1199 W ARDMORE AVE

14.0

12/27/93

12/27/93

0 12/27/93

12/27/93

10,500

100

805 06 2719 / 8905

1195 W ARGYLE ST

22.0

03/20/94

03/20/94

0 03/20/94

03/20/94

16,500

100

805 06 2870 / 9056

1199 W BALMORAL AVE

14.0

12/09/93

12/09/93

0 12/09/93

12/09/93

10,500

100

805 06 2296 / 8482

1199 W BERWYN AVE

22.0

09/25/96

09/25/96

0 09/25/96

09/25/96

16,500

100

805 06 2194 / 8380

937 W BRYN MAWR AVE

18.0

12/31/95

12/31/95

0 12/31/95

12/31/95

13,500

100

805 06 2871 / 9057

1198 W BRYN MAWR AVE

40.0

02/11/94

02/11/94

0 02/11/94

02/11/94

30,000

100

302 00 0072 / 5760

1120 W CATALPA AVE

1.0

0 01/18/00

02/04/00

15,500

100

805 06 2151 / 8337

1195 W CATALPA AVE

11.0

12/31/94

12/31/94

0 12/31/94

12/31/94

8,250

100

805 06 2869 / 9055

1199 W FOSTER AVE

14.0

02/17/93

02/17/93

0 02/17/93

02/17/93

10,500

100

302 00 0071 / 5759

1120 W GLENLAKE AVE

0 04/04/99

04/13/99

14,256

100

805 06 2152 / 8338

1200 W GLENLAKE AVE

11.0

12/31/94

12/31/94

0 12/31/94

12/31/94

8,250

100

805 06 2872 / 9058

1199 W HOLLYWOOD AVE

14.0

01/21/94

01/21/94

0 01/21/94

01/21/94

10,500

100

805 06 2720 / 8906

1199 W THORNDALE AVE

22.0

03/30/94

03/30/94

0 03/30/94

03/30/94

16,500

100

805 06 2616 / 8802

1199 W WINONA ST

14.0

11/11/94

11/11/94

0 11/11/94

11/11/94

10,500

100

Totals per Underpass Lighting

477.0

14,052

213,038

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 520

1/1/2008 AND 12/31/2008

Ward 48 Mary Ann Smith CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install 210 06 / 32280

N BROADWAY AND W FOSTER AVE

Work Type: Removal Temp Wiring - Signals

Locations .0

05/04/08

12/31/08

10,800

0

0

Crossings

300 06 0197 / 5322

N BROADWAY AND W ARDMORE AVE

2.0

8,000 12/05/01

12/07/01

4,737

100

300 06 0197 / 5322

N BROADWAY AND W BERWYN AVE

1.0

4,000 12/03/01

12/05/01

3,842

100

Totals per Removal Temp Wiring - Signals

Work Type: Signals 300 06 0096 / 5258

5533 N BROADWAY

Work Type: TSM Install

3.0

12,000

8,579

Intersections 33.0

11/19/03

11/23/03

0 09/21/06

09/26/06

5,218

100

65,450 12/09/99

02/11/00

50,081

100

Locations

210 06 0020 / 4295

W FOSTER AVE AND N GLENWOOD AVE

01/15/01

03/15/01

300 07 0048 / 5471

W FOSTER AVE AND N SHERIDAN RD

1.0

11/17/05

04/03/06

814 06 0077 / 16293

5929 N BROADWAY

1.0

12/06/94

12/06/94

0 12/06/94

12/06/94

129,903

100

814 06 0078 / 16294

6000 N BROADWAY

1.0

05/08/95

05/08/95

0 05/08/95

05/08/95

97,884

100

814 06 0154 / 16368

6200 N BROADWAY

1.0

10/24/94

10/24/94

0 10/24/94

10/24/94

101,516

100

814 06 0145 / 16359

5599 N KENMORE AVE

1.0

02/27/92

02/27/92

0 02/27/92

02/27/92

90,110

100

814 06 0147 / 16361

5700 N KENMORE AVE

1.0

02/20/92

02/20/92

0 02/20/92

02/20/92

99,051

100

814 06 0149 / 16363

5700 N RIDGE AVE

1.0

12/23/91

12/23/91

0 12/23/91

12/23/91

99,051

100

814 06 0240 / 16452

5748 N RIDGE AVE

1.0

01/01/91

01/01/91

0 01/01/91

01/01/91

100,000

100

814 06 0151 / 16365

5800 N RIDGE AVE

1.0

12/26/91

12/26/91

0 12/26/91

12/26/91

99,051

100

814 06 0143 / 16357

5600 N SHERIDAN RD

1.0

02/25/92

02/25/92

0 02/25/92

02/25/92

90,110

100

814 06 0074 / 16290

5700 N SHERIDAN RD

1.0

01/01/97

01/01/97

0 06/30/95

06/30/95

37,836

100

814 06 0148 / 16362

5700 N SHERIDAN RD

1.0

02/24/92

02/24/92

0 02/24/92

02/24/92

99,051

100

814 06 0144 / 16358

5599 N WINTHROP AVE

1.0

02/26/92

02/26/92

0 02/26/92

02/26/92

90,110

100

814 06 0152 / 16366

5700 N WINTHROP AVE

1.0

02/21/92

02/21/92

0 02/21/92

02/21/92

99,051

100

14.0

275,000

0

340,450

1,282,805

363,250

1,296,602

Totals per Construction Phase

3,125,335

2,992,553

Totals for Ward 48

3,399,235

3,012,726

Totals per TSM Install Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 521

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32146

ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE

1.0

05/01/07

10/31/07

300 06 / 32277

ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD

.0

04/01/08

08/30/08

0

300 06 0308 / 5414

ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

.0

02/01/06

07/31/06

0 02/01/06

210 06 0023 / 4298

N CLARK ST AND N ROGERS AVE

.0

02/06/02

04/02/02

0 02/06/02

Totals per Design/Engineering

1.0

3,900 06/28/07

3,900

07/19/07

2,374

100

0

0

07/31/06

3,608

100

04/02/02

0

0

5,982

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 522

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout

Fixtures

300 03 0049 / 4920

W ESTES AVE AND N GREENVIEW AVE

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W ESTES AVE AND N PAULINA ST

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W GREENLEAF AVE AND N GREENVIEW AVE

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W GREENLEAF AVE AND N PAULINA ST

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W LUNT AVE AND N GREENVIEW AVE

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W LUNT AVE AND N PAULINA ST

1.0

09/10/04

09/10/04

375 09/10/04

09/10/04

0

100

Totals per 250 Watt Changeout

Work Type: 400 Watt Changeout 300 03 0040 / 4911

ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE

300 06 0069 / 5233

ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE

300 03 0049 / 4920

6.0

2,250

0

Fixtures 8.0

08/20/04

09/20/04

3,200 07/14/04

08/10/04

2,092

100

26.84

12/02/02

12/02/02

10,736 11/30/02

11/30/02

6,599

100

W ESTES AVE AND N ASHLAND AVE

3.0

09/10/04

09/10/04

1,400 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W GREENLEAF AVE AND N ASHLAND AVE

3.0

09/10/04

09/10/04

1,400 09/10/04

09/10/04

0

100

300 03 0049 / 4920

W LUNT AVE AND N ASHLAND AVE

3.0

09/10/04

09/10/04

1,400 09/10/04

09/10/04

0

100

Totals per 400 Watt Changeout Totals per Lighting/Electrical

43.84

18,136

8,691

4,693,042

3,001,506

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 523

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps

Installations

805 06 0721 / 6907

6949 N ASHLAND BLVD

1.0

08/16/96

08/16/96

0 08/16/96

08/16/96

300

100

805 06 1533 / 7719

7130 N CLARK ST

1.0

10/21/97

10/21/97

0 10/21/97

10/21/97

300

100

805 06 1128 / 7314

6964 N GREENVIEW AVE

1.0

02/14/96

02/14/96

0 02/14/96

02/14/96

300

100

300 06 0139 / 5289

7356 N GREENVIEW AVE

621.0

03/01/04

12/01/04

0 05/10/06

05/20/06

18,763

100

302 00 0092 / 5774

7356 N GREENVIEW AVE

3.0

0 03/16/01

12/12/01

707

100

805 06 0599 / 6785

7434 N OAKLEY AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0680 / 6866

6971 N RIDGE BLVD

1.0

08/01/96

08/01/96

0 08/01/96

08/01/96

300

100

805 06 0661 / 6847

7053 N RIDGE BLVD

1.0

08/01/96

08/01/96

0 08/01/96

08/01/96

300

100

805 06 0646 / 6832

6548 N SHERIDAN RD

1.0

03/14/97

03/14/97

0 03/14/97

03/14/97

300

100

805 06 0647 / 6833

7021 N SHERIDAN RD

1.0

03/14/97

03/14/97

0 03/14/97

03/14/97

300

100

805 06 0648 / 6834

7025 N SHERIDAN RD

1.0

03/12/97

03/12/97

0 03/12/97

03/12/97

300

100

805 06 0633 / 6819

7714 N SHERIDAN RD

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 0436 / 6622

7319 N WOLCOTT AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 0857 / 7043

1565 W BIRCHWOOD AVE

1.0

08/01/96

08/01/96

0 08/01/96

08/01/96

300

100

805 06 0858 / 7044

1836 W BIRCHWOOD AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1957 / 8143

1811 W CHASE AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1529 / 7715

1718 W ESTES AVE

1.0

11/12/97

11/12/97

0 11/12/97

11/12/97

300

100

805 06 0860 / 7046

1425 W FARGO AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1100 / 7286

1638 W GREENLEAF AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1101 / 7287

1920 W GREENLEAF AVE

1.0

12/02/96

12/02/96

0 12/02/96

12/02/96

300

100

805 06 1130 / 7316

2030 W GREENLEAF AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

805 06 1831 / 8017

1319 W LUNT AVE

1.0

10/03/96

10/03/96

0 10/03/96

10/03/96

300

100

805 06 1889 / 8075

1509 W LUNT AVE

1.0

02/14/96

02/14/96

0 02/14/96

02/14/96

300

100

805 06 1918 / 8104

1530 W MORSE AVE

1.0

02/14/96

02/14/96

0 02/14/96

02/14/96

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

7356 N GREENVIEW AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

7356 N GREENVIEW AVE

646.0

0

26,070

Lamps 687.0

06/01/07

12/31/07

20,225 08/01/07

08/18/07

20,225

100

0 04/18/02

04/21/02

10,779

100

Installations 592.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 524

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install

Fixtures

300 06 0167 / 5306

7442 N ASHLAND AVE

1.0

0 01/11/99

01/11/99

351

100

300 06 0167 / 5306

7300-7400 N GREENVIEW AVE

3.0

0 11/09/99

11/09/99

1,053

100

300 06 0167 / 5306

7410 N GREENVIEW AVE

1.0

0 08/14/99

08/14/99

351

100

5.0

0

Totals per Flood Light Install

Work Type: Ornamental - Piggyback Lighting 300 06 0069 / 5233

ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST

Fixtures 6.0

11/20/02

12/05/02

27,600 11/10/02

Work Type: Ornamental Lighting

Blocks

300 07 0049 / 5472

7700 N ASHLAND AVE

1.0

04/18/06

11/18/06

2,000

300 11 / 32238

7700 N ASHLAND AVE

1.0

01/18/07

01/18/07

2,000 01/18/07

300 07 0049 / 5472

7500 N SEELEY AVE

1.0

04/18/06

11/18/06

2,000

300 11 / 32238

7500 N SEELEY AVE

1.0

01/18/07

01/18/07

2,000 01/18/07

Totals per Ornamental Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

7356 N GREENVIEW AVE

1,755

4.0

12/06/02

29,679

0

0

01/18/07

834

100

0

0

01/18/07

834

100

8,000

1,668

0

0

100

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 525

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 11 / 32238

ON N ASHLAND AVE FROM W JONQUIL TER TO W JUNEWAY TER

1.0

04/01/08

06/27/08

300 06 / 32146

ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE

4.0

12/05/07

06/27/08

247,147 12/07/07

300 07 0049 / 5472

Hamilton from Touhy to Jarvis under the same project Note Last Updated on 04-MAR-08 ON N CLAREMONT AVE FROM W TOUHY AVE TO W HOWARD ST 4.0

04/18/06

11/18/06

280,000 09/27/06

300 09 / 33115

ON N DAMEN AVE FROM N ROGERS AVE TO W JARVIS AVE

2.0

130,000 04/01/08

300 05 0049 / 5164

ON N HONORE ST FROM W CHASE AVE TO N ROGERS AVE

1.0

300 09 / 33115

ON N HOYNE AVE FROM W JARVIS AVE TO W HOWARD ST

2.0

300 06 / 32277

ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD

300 09 / 33115

ON N OAKLEY AVE FROM W TOUHY AVE TO W HOWARD ST

4.0

280,000 04/01/08

300 09 / 33115

ON N SEELEY AVE FROM W JARVIS AVE TO W FARGO AVE

1.0

300 05 0049 / 5164

ON N WOLCOTT AVE FROM W TOUHY AVE TO N ROGERS AVE

2.0

04/04/05

11/18/05

300 11 / 32238

ON W ALBION AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD

1.0

04/01/08

06/27/08

71,500

300 05 0049 / 5164

ON W CHASE AVE FROM N DAMEN AVE TO N ROGERS AVE

1.0

04/04/05

11/18/05

50,000 11/01/05

300 11 / 32238

ON W COLUMBIA AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD

1.0

04/01/08

06/27/08

300 11 / 32238

ON W ESTES AVE FROM N ASHLAND BLVD TO N CLARK ST

1.0

300 07 0049 / 5472

ON W ESTES AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

2.0

04/18/06

11/18/06

300 07 0049 / 5472

ON W FARWELL AVE FROM N ASHLAND BLVD TO N GLENWOOD AVE

1.0

04/18/06

11/18/06

300 11 / 32238

ON W FARWELL AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

2.0

04/01/08

06/27/08

300 11 / 32238

ON W GREENLEAF AVE FROM N ASHLAND BLVD TO N CLARK ST

2.0

300 06 0308 / 5414

ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

2.0

05/08/06

07/14/06

300 05 0049 / 5164

Project has been completed as of 07/14/2006 Note Last Updated on 25-AUG-06 ON W JARVIS AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE

1.0

04/04/05

300 05 0049 / 5164

ON W JARVIS AVE FROM N CLARK ST TO N ASHLAND BLVD

2.0

04/04/05

300 05 0049 / 5164

ON W JONQUIL TER FROM N SHERIDAN RD TO N ASHLAND AVE

2.0

300 07 0049 / 5472

ON W JUNEWAY TER FROM N ASHLAND AVE TO N HASKINS AVE

300 07 0049 / 5472

.0

04/04/05

11/18/05

05/04/08

12/31/08

40,000

0

0

0

75

04/27/07

261,872

100

12/01/08

0

0

50,000 11/01/05

03/22/06

45,748

100

167,500 04/01/08

12/01/08

0

0

0

0

12/01/08

0

0

32,500 04/01/08

12/01/08

0

0

170,000 11/01/05

03/22/06

91,496

100

0

0

03/22/06

45,748

100

71,500

0

0

45,000

0

0

0

170,000 08/10/06

10/06/06

179,415

100

70,000 09/13/06

10/31/06

67,868

100

150,000

0

0

130,000

0

0

219,094 05/08/06

07/14/06

151,913

100

11/18/05

85,000 10/28/05

03/22/06

116,148

100

11/18/05

120,000 11/30/05

03/22/06

107,562

100

04/04/05

11/18/05

110,000 10/21/05

03/22/06

122,595

100

2.0

04/18/06

11/18/06

170,000 10/19/06

05/04/07

160,890

100

ON W LUNT AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE

1.0

04/18/06

11/18/06

70,000 09/13/06

10/31/06

67,867

100

300 06 0298 / 5405

ON W LUNT AVE FROM N GREENVIEW AVE TO N SHERIDAN RD

2.0

0 06/10/05

08/22/05

94,038

100

300 11 / 32238

ON W LUNT AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

3.0

04/01/08

06/27/08

150,000

0

0

300 11 / 32238

ON W MORSE AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD

3.0

04/01/08

06/27/08

150,000

0

0

3,229,241

1,513,160

Totals per Residntl Staggered Lighting

50.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 526

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps

Blocks

300 03 0049 / 4920

ON N BOSWORTH AVE FROM W HOWARD ST TO W JONQUIL TER

10/15/04

12/15/04

80,000 11/08/04

02/15/05

47,191

100

300 03 0049 / 4920

ON N GREENVIEW AVE FROM W FARWELL AVE TO W LUNT AVE

07/20/04

09/20/04

140,000 08/03/04

02/15/05

94,257

100

300 03 0049 / 4920

ON N MARSHFIELD AVE FROM W HOWARD ST TO W JUNEWAY TER

09/20/04

11/20/04

171,000 10/19/04

02/15/05

130,365

100

300 06 0122 / 5275

ON N PAULINA ST FROM W HOWARD ST TO W JUNEWAY TER

11/15/03

01/15/04

175,000 10/16/03

12/09/03

156,063

100

300 03 0049 / 4920

ON N SEELEY AVE FROM W HOWARD ST TO W FARGO AVE

10/01/04

12/01/04

160,000 10/22/04

05/02/05

127,835

100

300 03 0049 / 4920

ON N WAYNE AVE FROM W MORSE AVE TO W PRATT BLVD

10/15/04

12/15/04

130,000 11/08/04

02/15/05

72,808

100

300 06 0267 / 5375

ON N WOLCOTT AVE FROM W HOWARD ST TO W FARGO AVE

08/01/04

09/01/04

148,760 08/12/04

12/10/04

143,771

100

300 03 0049 / 4920

ON W FARGO AVE FROM N GREENVIEW AVE TO N ASHLAND BLVD

11/15/04

01/15/05

95,000 11/08/04

02/15/05

62,218

100

300 03 0049 / 4920

ON W FARWELL AVE FROM N CLARK ST TO N ASHLAND BLVD

10/15/04

12/15/04

90,000 11/10/04

02/14/05

56,953

100

300 06 0254 / 5364

1707 W MORSE AVE

08/01/03

08/29/03

105,245 08/11/03

09/02/03

96,198

100

Totals per Residntl Strt Lighting/Lamps

Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774

2.0

2.0

2.0 6.0

1.0

Work Type: Strt Light Pole Painting

Locations

ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE

300 04 0216 / 5114

ON N SHERIDAN RD FROM W DEVON AVE TO W ALBION AVE

300 06 0058 / 5229

ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE

300 06 0058 / 5229 300 06 0058 / 5229

987,659

Locations

2000 W BIRCHWOOD AVE

300 03 0040 / 4911

1,295,005

0 03/26/01

03/26/01

378

100

8.0

05/10/04

09/10/04

2,200 05/10/04

08/01/04

2,160

100

14.0

05/01/06

11/01/06

3,028 05/17/06

08/05/06

3,028

100

50.49

09/20/02

10/20/02

11,550 09/20/02

10/30/02

11,550

100

ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST

15.0

09/27/02

10/15/02

7,910 10/07/02

10/30/02

7,910

100

ON W TOUHY AVE FROM N SHERIDAN RD TO N CLARK ST

31.0

09/27/02

10/19/02

8,610 10/07/02

11/20/02

8,610

100

Totals per Strt Light Pole Painting

Work Type: Strt Lighting

118.49

33,298

33,258

Blocks

302 00 0092 / 5774

ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST

1.0

03/01/02

03/31/02

15,000 12/10/01

12/10/01

6,228

100

300 06 0078 / 5241

7500 S HERMITAGE AVE

1.0

04/01/98

12/01/98

10,620 07/21/00

08/30/00

18,634

100

2.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping 300 06 0139 / 5289

7356 N GREENVIEW AVE

25,620

24,862

Lamps 1,848.0

03/01/04

12/01/04

9,610 11/06/06

11/07/06

20,125

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 527

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting

Fixtures

300 06 0217 / 5337

7356 N GREENVIEW AVE

428.0

07/29/04

08/09/04

24,057 07/13/04

07/23/04

8,560

100

805 06 2651 / 8837

7398 N ROGERS AVE

10.0

12/14/94

12/14/94

0 12/14/94

12/14/94

7,500

100

805 06 2852 / 9038

7492 N ROGERS AVE

14.0

04/23/92

04/23/92

0 04/23/92

04/23/92

10,500

100

805 06 2726 / 8912

6501 N SHERIDAN RD

51.0

02/15/95

02/15/95

0 02/15/95

02/15/95

38,250

100

805 06 2875 / 9061

1899 W BIRCHWOOD AVE

10.0

06/01/93

06/01/93

0 06/01/93

06/01/93

7,500

100

805 06 2460 / 8646

1495 W CHASE AVE

18.0

09/22/95

09/22/95

0 09/22/95

09/22/95

13,500

100

302 00 0071 / 5759

1350 W COLUMBIA AVE

0 03/07/99

03/12/99

11,638

100

805 06 2727 / 8913

1404 W ESTES AVE

12.0

05/10/94

05/10/94

0 05/10/94

05/10/94

9,000

100

805 06 2721 / 8907

1780 W ESTES AVE

8.0

06/30/94

06/30/94

0 06/30/94

06/30/94

6,000

100

805 06 2851 / 9037

1605 W FARGO AVE

25.0

02/09/94

02/09/94

0 02/09/94

02/09/94

18,750

100

805 06 2254 / 8440

1406 W FARWELL AVE

14.0

08/16/96

08/16/96

0 08/16/96

08/16/96

10,500

100

805 06 2725 / 8911

1780 W FARWELL AVE

10.0

07/27/94

07/27/94

0 07/27/94

07/27/94

7,500

100

302 00 0071 / 5759

1120 W GRANVILLE AVE

0 03/20/99

03/30/99

21,337

100

302 00 0071 / 5759

1400 W GREENLEAF AVE

0 03/08/99

03/12/99

6,206

100

805 06 2850 / 9036

1408 W GREENLEAF AVE

14.0

12/28/93

12/28/93

0 12/28/93

12/28/93

10,500

100

805 06 2849 / 9035

1750 W GREENLEAF AVE

10.0

02/01/94

02/01/94

0 02/01/94

02/01/94

7,500

100

805 06 2729 / 8915

1599 W JARVIS AVE

16.0

08/05/94

08/05/94

0 08/05/94

08/05/94

12,000

100

302 00 0071 / 5759

1400 W LUNT AVE

0 03/25/99

04/05/99

20,125

100

805 06 2722 / 8908

1800 W LUNT AVE

10.0

06/28/94

06/28/94

0 06/28/94

06/28/94

7,500

100

805 06 2247 / 8433

1407 W MORSE AVE

21.0

10/15/96

10/15/96

0 10/15/96

10/15/96

15,750

100

805 06 2723 / 8909

1781 W MORSE AVE

10.0

07/12/94

07/12/94

0 07/12/94

07/12/94

7,500

100

805 06 2149 / 8335

1400 W PRATT BLVD

12.0

12/31/94

12/31/94

0 12/31/94

12/31/94

9,000

100

805 06 2675 / 8861

1770 W PRATT BLVD

10.0

11/03/94

11/03/94

0 11/03/94

11/03/94

7,500

100

302 00 0070 / 5758

1120 W ROSEMONT AVE

0 11/25/97

12/01/97

9,975

100

805 06 2124 / 8310

1120 W ROSEMONT AVE

0 12/01/97

12/01/97

9,750

100

302 00 0071 / 5759

1120 W SHERIDAN RD

0 05/18/99

05/27/99

15,856

100

805 06 2728 / 8914

1401 W TOUHY AVE

12.0

05/13/94

05/13/94

0 05/13/94

05/13/94

9,000

100

805 06 2792 / 8978

1760 W TOUHY AVE

6.0

04/13/94

04/13/94

0 04/13/94

04/13/94

4,500

100

Totals per Underpass Lighting

13.0

734.0

12/01/97

12/01/97

24,057

323,197

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 528

1/1/2008 AND 12/31/2008

Ward 49 Joe Moore CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

ON W HOWARD ST FROM N HERMITAGE AVE TO N PAULINA ST

1.0

0 12/18/01

12/18/01

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W HOWARD ST

.50

05/03/05

05/04/05

5,282 04/21/05

04/21/05

5,042

100

210 06 0219 / 4459

N WESTERN AVE AND W TOUHY AVE

.50

04/29/05

04/30/05

5,282 03/11/05

03/11/05

5,042

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow 210 06 0023 / 4298

7356 N GREENVIEW AVE

Work Type: TSM Install

10,563

11,934

Locations

N CLARK ST AND N ROGERS AVE

Work Type: Signals 300 06 0096 / 5258

2.0

04/15/03

05/01/03

6,000 01/08/03

01/15/03

4,801

100

11/25/03

12/01/03

0 09/22/06

09/30/06

6,957

100

Intersections 44.0

Locations

814 06 0064 / 16280

6399 N BROADWAY

1.0

10/06/95

10/06/95

0 10/06/95

10/06/95

111,594

100

814 06 0304 / 16516

6551 N SHERIDAN RD

1.0

06/14/91

06/14/91

0 06/14/91

06/14/91

69,253

100

210 06 0104 / 4364

1900 W LUNT AVE

1.0

12/01/00

03/31/01

170,903 11/20/00

04/26/01

183,550

100

Totals per TSM Install

3.0

170,903

364,397

187,466

388,089

Totals per Construction Phase

4,880,508

3,389,595

Totals for Ward 49

4,884,408

3,395,577

Totals per Traffic

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 529

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering

Projects

300 06 / 32275

ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE

.0

03/01/07

10/31/07

300 06 / 32277

ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

04/01/08

08/30/08

0

300 06 0308 / 5414

ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE

.0

02/01/06

07/31/06

0 02/01/06

210 06 / 32040

W DEVON AVE AND N WESTERN AVE

.0

11/01/06

12/31/07

210 06 0158 / 5058

W PETERSON AVE AND N KIMBALL AVE

.0

08/15/05

12/31/05

300 06 0282 / 5390

W PETERSON AVE AND N RICHMOND ST

Totals per Design/Engineering

.50 .50

3,900 03/06/07

04/03/07

07/31/06

5,000

2,655

0

0

0

2,400

100

1,274

0

0 08/15/05

12/31/05

235

100

500 09/17/04

10/06/04

500

100

9,400

7,064

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 530

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

No of Units

Street Address

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Fixtures

Work Type: 250 Watt Changeout 300 06 0307 / 5413

ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE

16.50

02/07/06

05/31/06

6,600 01/16/05

02/10/06

4,100

100

300 06 0307 / 5413

W GRANVILLE AVE AND N LEAVITT ST

2.0

02/07/06

05/31/06

800 01/16/05

02/10/06

497

100

300 06 0069 / 5233

7100 N WASHTENAW AVE

6.0

07/19/02

07/19/02

1,260 07/16/02

07/16/02

1,218

100

300 06 0069 / 5233

3000 W SHERWIN AVE

4.0

07/04/02

07/04/02

840 07/01/02

07/01/02

812

100

28.50

Totals per 250 Watt Changeout

9,500

6,627

Fixtures

Work Type: 400 Watt Changeout 300 09 / 33116

ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD

27.0

05/05/08

05/23/08

8,750 04/25/08

05/02/08

8,750

300 09 / 33116

ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE

6.0

05/12/08

05/23/08

2,400 05/07/08

05/30/08

2,400

100

300 09 / 33116

ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE

300 09 / 33116

ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE

300 03 0040 / 4911 300 03 0050 / 4921

100

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

18.0

05/13/08

05/30/08

7,200 05/13/08

05/23/08

7,200

100

ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE

30.02

08/20/04

09/20/04

12,008 08/01/04

08/20/04

7,847

100

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

46.08

10/01/04

10/20/04

18,432 08/27/04

09/06/04

12,834

100

Totals per 400 Watt Changeout

127.10

48,790

39,031

Work Type: Alley Lighting/Lamps

Installations

805 06 0809 / 6995

6222 N CAMPBELL AVE

1.0

01/25/96

01/25/96

0 01/25/96

01/25/96

300

100

805 06 1072 / 7258

6423 N HAMILTON AVE

1.0

06/01/95

06/01/95

0 06/01/95

06/01/95

300

100

300 06 0139 / 5289

6199 N LINCOLN AVE

1,134.0

03/01/06

09/01/06

30,303 05/20/06

06/01/06

34,262

100

302 00 0092 / 5774

6199 N LINCOLN AVE

6.0

0 04/25/01

01/04/02

1,414

100

805 06 1619 / 7805

6500 N WESTERN AVE

1.0

0 09/24/97

09/24/97

300

100

Totals per Alley Lighting/Lamps

Work Type: Arterial Group Relamping 300 06 0238 / 5352

6199 N LINCOLN AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0166 / 5305

6100 N LINCOLN AVE

Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228

6199 N LINCOLN AVE

09/24/97

09/24/97

1,143.0

30,303

36,576

Lamps 1,332.0

06/01/07

12/31/07

39,214 07/31/07

08/18/07

39,214

100

02/21/01

11/01/01

88,237 02/21/01

11/07/01

5,584

100

0 04/07/02

04/10/02

22,341

100

Blocks 1.0

Installations 1,227.0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 531

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 09 / 33116

ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE

Work Type: Lighting Imprvmnts 300 06 0282 / 5390

W PETERSON AVE AND N RICHMOND ST

Work Type: Ornamental - Piggyback Lighting

Installations 18.0

02/01/08

12/31/08

10/06/04

10/31/04

18,000 06/06/08

07/11/08

16,000

100

0

0

100

Projects .0

0

Fixtures

300 09 / 33116

ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD

27.0

06/23/08

07/11/08

36,990 07/22/08

08/11/08

40,000

300 09 / 33116

ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE

6.0

05/12/08

06/27/08

8,220 07/18/08

08/11/08

9,000

100

300 09 / 33116

ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE

18.0

07/01/08

07/11/08

24,300 07/11/08

08/11/08

18,826

100

Totals per Ornamental - Piggyback Lighting

Work Type: Ornamental Lighting

51.0

69,510

67,826

Blocks

300 09 / 33116

ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

Totals per Ornamental Lighting

Work Type: Residential Regrouping 300 06 0270 / 5378

6199 N LINCOLN AVE

Totals per Lighting/Electrical

.0

0

0

0

0

6,196,177

1,445,792

Lamps .0

03/01/08

12/01/08

0

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 532

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33116

ON N ALBANY AVE FROM W ALBION AVE TO W DEVON AVE

2.0

300 09 / 33116

ON N ALBANY AVE FROM W DEVON AVE TO W ALBION AVE

1.0

300 09 / 33116

ON N ALBANY AVE FROM W DEVON AVE TO W PETERSON AVE

.0

300 09 / 33116

ON N ALBANY AVE FROM W PETERSON AVE TO W DEVON AVE

1.0

300 09 / 33116

ON N BELL AVE FROM W GRANVILLE AVE TO W DEVON AVE

300 11 / 32239

02/01/08

02/01/08

12/31/08

12/31/08

130,000 04/01/08

12/01/08

0

100

130,000 04/01/08

12/01/08

0

0

0 04/01/08

12/01/08

0

0

184,000 04/01/08

12/01/08

0

0

0 04/01/08

12/01/08

0

0

0

0

.0

02/01/08

12/31/08

2.0

03/01/07

12/31/07

300 09 / 33116

ON N CENTRAL PARK AVE FROM W GRANVILLE AVE TO W PETERSON AVE ON N FRANCISCO AVE FROM W DEVON AVE TO W PETERSON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N FRANCISCO AVE FROM W DEVON AVE TO W PRATT BLVD

4.0

04/09/08

05/19/08

260,000 04/01/08

12/01/08

0

100

300 09 / 33116

ON N FRANCISCO AVE FROM W PETERSON AVE TO W DEVON AVE

1.0

285,000 04/01/08

12/01/08

0

0

300 06 / 32275

ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE

.0

04/01/07

12/31/07

151,760 04/06/07

08/03/07

90,228

100

300 09 / 33116

ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N LEAVITT ST FROM W GRANVILLE AVE TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N MOZART ST FROM W DEVON AVE TO W PETERSON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N MOZART ST FROM W DEVON AVE TO W PRATT BLVD

4.0

04/05/08

05/19/08

260,000 04/01/08

12/01/08

0

100

300 09 / 33116

ON N MOZART ST FROM W PETERSON AVE TO W DEVON AVE

1.0

285,000 04/01/08

12/01/08

0

0

300 09 / 33116

ON N MOZART ST FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N RICHMOND ST FROM W DEVON AVE TO W PETERSON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N RICHMOND ST FROM W DEVON AVE TO W PRATT BLVD

4.0

04/10/08

05/19/08

260,000 04/01/08

12/01/08

0

100

300 09 / 33116

ON N RICHMOND ST FROM W PETERSON AVE TO W DEVON AVE

1.0

285,000 04/01/08

12/01/08

0

0

300 09 / 33116

ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N SACRAMENTO AVE FROM W ARTHUR AVE TO W PRATT BLVD

1.0

193,600 04/01/08

12/01/08

0

0

300 09 / 33116

ON N SACRAMENTO AVE FROM W DEVON AVE TO W ARTHUR AVE

1.0

0

300 09 / 33116

ON N SACRAMENTO AVE FROM W DEVON AVE TO W PETERSON AVE

300 09 / 33116

.0

110,000

66,400 04/01/08

12/01/08

0

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

ON N SACRAMENTO AVE FROM W DEVON AVE TO W PRATT BLVD

1.0

02/01/08

12/31/08

296,573 04/01/08

12/01/08

0

100

300 09 / 33116

ON N SACRAMENTO AVE FROM W PETERSON AVE TO W DEVON AVE

1.0

285,000 04/01/08

12/01/08

0

0

300 06 / 32277

ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

05/04/08

12/31/08

0

300 06 0298 / 5405

ON N TALMAN AVE FROM W PETERSON AVE TO W GRANVILLE AVE

2.0

06/15/05

07/15/05

0 06/15/05

300 09 / 33116

ON N TROY ST FROM N LINCOLN AVE TO W DEVON AVE

1.0

300 09 / 33116

ON N TROY ST FROM W ALBION AVE TO W DEVON AVE

2.0

02/01/08

12/31/08

300 06 0308 / 5414

ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE

2.0

04/17/06

300 07 0040 / 5463

ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE

.50

07/17/06

0

0

08/12/05

100,795

100

184,000 04/01/08

12/01/08

0

0

130,000 04/01/08

12/01/08

0

100

06/01/06

141,265 04/12/06

06/09/06

99,063

100

09/08/06

42,500 08/14/06

10/13/06

38,578

100

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 533

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting

Blocks

300 09 / 33116

ON N WHIPPLE ST FROM W DEVON AVE TO W PETERSON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N WHIPPLE ST FROM W DEVON AVE TO W PRATT BLVD

4.0

04/15/08

05/06/08

260,000 04/01/08

12/01/08

0

100

300 09 / 33116

ON N WHIPPLE ST FROM W PETERSON AVE TO W DEVON AVE

1.0

184,000 04/01/08

12/01/08

0

0

300 09 / 33116

ON N WHIPPLE ST FROM W PRATT BLVD TO W DEVON AVE

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON W DEVON AVE FROM N ALBANY AVE TO N TROY ST

130,000 04/01/08

12/01/08

0

0

300 09 / 33116

ON W GRANVILLE AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE

.0

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON W GRANVILLE AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE

1.0

184,000 04/01/08

12/01/08

0

0

300 09 / 33116

ON W HOOD AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE

.0

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON W HOOD AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE

1.0

184,000 04/01/08

12/01/08

0

0

Totals per Residntl Staggered Lighting

Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349

ON N DAMEN AVE FROM W DEVON AVE TO W ALBION AVE

Work Type: Strt Light Pole Painting

.0 1.0

02/01/08

02/01/08

12/31/08

12/31/08

40.50

4,622,098

328,664

Blocks 2.0

05/01/03

07/01/03

161,203 04/23/03

07/08/03

148,028

100

100

Locations

300 09 / 33116

ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD

27.0

05/05/08

05/23/08

10,260 05/01/08

05/16/08

5,400

300 09 / 33116

ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

300 09 / 33116

ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE

6.0

05/12/08

06/27/08

2,280 05/12/08

05/23/08

1,200

100

300 09 / 33116

ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE

300 09 / 33116

ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE

302 00 0076 / 5764 300 03 0050 / 4921 300 03 0040 / 4911

.0

02/01/08

12/31/08

0 04/01/08

12/01/08

0

0

18.0

05/05/08

06/27/08

5,400 05/05/08

05/16/08

3,600

100

ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD

23.50

04/11/98

04/17/98

0 04/11/98

04/17/98

400

100

ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE

49.44

10/01/04

10/20/04

13,992 07/10/04

08/27/04

13,809

100

ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST

37.05

05/10/04

09/10/04

9,101 05/10/04

08/01/04

10,004

100

Totals per Strt Light Pole Painting

160.99

41,033

34,412

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 534

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

% Cmplt

Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting

Blocks

300 06 0246 / 5356

ON N BELL AVE FROM W MORSE AVE TO W FARWELL AVE

.50

09/01/04

12/01/04

54,000 05/19/05

10/03/05

66,733

100

300 06 0246 / 5356

ON N HAMILTON AVE FROM W MORSE AVE TO W PRATT BLVD

1.0

09/01/04

12/01/04

108,000 05/20/05

10/03/05

66,733

100

300 06 0246 / 5356

ON N OAKLEY AVE FROM W PRATT BLVD TO W MORSE AVE

1.0

09/01/04

12/31/04

108,000 06/14/05

10/13/05

66,733

100

300 06 0246 / 5356

ON N SEELEY AVE FROM W FARWELL AVE TO W PRATT BLVD

.50

09/01/04

12/01/04

54,000 06/12/05

09/23/05

66,733

100

300 06 0246 / 5356

ON N WASHTENAW AVE FROM W SHERWIN AVE TO W TOUHY AVE

1.50

09/01/04

12/01/04

108,000 06/17/05

09/23/05

66,733

100

300 06 0246 / 5356

ON W COLUMBIA AVE FROM N DAMEN AVE TO N SEELEY AVE

.50

08/01/04

12/01/04

108,000 06/17/05

10/13/05

66,733

100

300 03 0050 / 4921

ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE

01/15/05

06/15/05

520,000 01/17/05

06/17/05

251,730

100

5.0

Totals per Strt Lighting

Work Type: Traffic Signal Regrouping

1,140.0

Work Type: Underpass Lighting

Fixtures

300 06 0217 / 5337

6199 N LINCOLN AVE

805 06 2704 / 8890

1780 W DEVON AVE

Totals per Underpass Lighting

652,128

Lamps

6199 N LINCOLN AVE

300 06 0139 / 5289

1,060,000

03/01/04

12/01/04

5,928 11/07/06

11/08/06

12,414

100

42.0

08/10/04

08/13/04

2,361 08/10/04

09/13/04

26,448

100

14.0

07/20/94

07/20/94

0 07/20/94

07/20/94

10,500

100

56.0

2,361

36,948

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 535

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

% Cmplt

Cost

Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install

Locations

210 06 0130 / 4389

N CALIFORNIA AVE AND W TOUHY AVE

1.0

0 03/21/02

03/21/02

8,539

90

210 06 0130 / 4389

N WESTERN AVE AND W ALBION AVE

1.0

0 05/14/02

05/14/02

1,850

100

210 06 0219 / 4459

N WESTERN AVE AND W ALBION AVE

1.0

04/29/05

04/29/05

10,563 04/23/05

04/23/05

8,007

100

210 06 0219 / 4459

N WESTERN AVE AND W DEVON AVE

1.0

04/26/05

04/27/05

10,563 04/09/05

04/09/05

8,007

100

210 06 0219 / 4459

N WESTERN AVE AND W GRANVILLE AVE

1.0

04/10/05

04/10/05

10,563 04/05/05

04/05/05

8,008

100

210 06 0219 / 4459

N WESTERN AVE AND W HOWARD ST

.50

05/03/05

05/04/05

5,282 04/21/05

04/21/05

5,042

100

210 06 0219 / 4459

N WESTERN AVE AND W LUNT AVE

1.0

04/28/05

04/29/05

10,563 03/02/05

03/02/05

8,008

100

210 06 0130 / 4389

N WESTERN AVE AND W PRATT AVE

1.0

0 04/24/02

04/24/02

10,074

100

210 06 0219 / 4459

N WESTERN AVE AND W TOUHY AVE

.50

5,282 03/11/05

03/11/05

5,042

100

Totals per LED Signal Head Install

Work Type: Left Turn Arrow

04/29/05

04/30/05

8.0

52,815

62,577

Locations

210 06 0231 / 4470

N CALIFORNIA AVE AND W PETERSON AVE

.0

03/01/08

12/01/08

98,116

0

0

210 06 / 32040

W DEVON AVE AND N WESTERN AVE

1.0

11/01/06

12/31/07

85,000 09/17/07

12/15/07

36,089

70

210 06 0158 / 5058

W PETERSON AVE AND N KIMBALL AVE

.50

06/02/06

02/19/07

30,000 06/22/06

03/02/07

33,249

100

Totals per Left Turn Arrow

Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322

N LEAVITT ST AND W DEVON AVE

Work Type: Signals 300 06 0096 / 5258

6199 N LINCOLN AVE

Work Type: TSM Install

1.50

213,116

69,338

Crossings 1.0

4,000 04/08/02

04/08/02

0

100

Intersections 29.0

11/25/03

12/01/03

0 09/16/03

09/22/03

4,585

100

Locations

814 06 0141 / 16355

6400 N CALIFORNIA AVE

1.0

07/22/93

07/22/93

0 07/22/93

07/22/93

109,947

100

814 06 0354 / 16551

7199 N KEDZIE AVE

1.0

01/01/96

01/01/96

0 01/01/96

12/31/97

175,000

100

814 06 0195 / 16407

7599 N KEDZIE AVE

1.0

04/09/96

04/09/96

0 04/09/96

04/09/96

150,000

100

814 06 0271 / 16483

6600 N WESTERN AVE

1.0

04/25/89

04/25/89

0 04/25/89

04/25/89

90,000

100

814 06 0357 / 16552

7000 N WESTERN AVE

1.0

10/11/90

10/11/90

0 10/11/90

10/11/90

86,982

100

814 06 0111 / 16326

7400 N WESTERN AVE

1.0

09/18/90

09/18/90

0 09/18/90

09/18/90

86,982

100

Totals per TSM Install

6.0

0

698,911

CPMR055

C apital P rogram M anagement

Projects By Ward, Phase, Work Category, Work Type

05-08-09 03:47 PM Page 536

1/1/2008 AND 12/31/2008

Ward 50 Bernard L. Stone CIP/CPM Number

Street Address

No of Units

Start

WIP Estimate End

Cost

Start

WIP Actual (to Date) End

Cost

Phase: Construction Work Category: Traffic Totals per Traffic

269,931

835,411

Totals per Construction Phase

6,466,108

2,281,203

Totals for Ward 50

6,475,508

2,288,267

175,941,558

169,885,440

Totals for Report

% Cmplt

C apital P rogram M anagement CPMR055 End of Report