Report
:
CPMR055
Run by
:
Taneja, Manmeet
Report Date:
05-08-09 03:47 PM
CPMR055: Projects By Ward, Phase, Work Category, Work Type (Address-level Date Period) Project Status = Active, Completed Publication Status = Not Publ, Prev Publ, Publ Program = All Sub Program = All Department = Streets AND Sanitation Project Manager = All Bureau = All Constr Phase Only? = No Include Only Work Types of Selected Dept? = Yes Work Category = All Work Type = All Geography = Ward Geo Result = All Address Date Period = None From Date =
1/1/2008
To Date =
12/31/2008
Fund Source =All Report Type =Verification
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 2
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414
ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE
300 06 / 32146
ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE
300 06 / 32277
Projects .0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,746
100
1.0
05/01/07
10/31/07
3,900 06/29/07
07/27/07
2,342
100
ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE
.0
04/01/08
08/30/08
300 06 / 32146
ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE
.0
05/01/07
10/31/07
300 06 / 32277
ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE
.0
04/01/08
08/30/08
300 06 / 32146
ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE
.0
05/01/07
10/31/07
300 06 0308 / 5414
ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE
.0
02/01/06
210 06 0243 / 4480
N ASHLAND AVE AND W CHICAGO AVE
.0
12/27/06
210 06 0240 / 4477
N ASHLAND AVE AND W DIVISION ST
.0
281 00 / 33670
2717 N ELSTON AVE
.0
Totals per Design/Engineering
1.0
0
0
0
07/27/07
2,000
100
0
0
3,900 06/15/07
07/20/07
2,000
100
07/31/06
0 02/01/06
07/31/06
1,086
100
01/26/07
250 12/27/06
01/26/07
638
100
10/10/05
07/31/06
1,500 10/10/05
08/08/06
317
100
01/01/08
12/31/08
0
0
0
13,450
11,128
3,900 06/28/07 0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 3
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON N ARTESIAN AVE FROM W NORTH AVE TO W WABANSIA AVE
5.0
03/07/03
03/08/03
2,075 03/07/03
03/07/03
1,507
100
300 09 / 33067
ON N CLAREMONT AVE FROM W POTOMAC AVE TO W HIRSCH ST
4.0
10/22/08
10/24/08
1,600 10/22/08
10/24/08
1,002
100
300 07 0032 / 5455
ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST
8.0
04/18/06
11/18/06
3,200 09/22/06
10/10/06
1,616
100
300 05 0001 / 5116
ON N MARSHFIELD AVE FROM W NORTH AVE TO W WABANSIA AVE
5.0
04/04/05
11/18/05
2,000 07/30/05
08/05/05
0
100
300 07 0001 / 5424
ON N ROCKWELL ST FROM W NORTH AVE TO W BLOOMINGDALE AVE
8.0
12/01/06
11/23/06
3,200 12/01/06
11/23/06
3,200
100
300 07 0001 / 5424
ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE
5.0
11/01/06
11/24/06
2,000 12/01/06
11/23/06
2,000
100
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
.0
03/01/06
12/31/06
300 07 0032 / 5455
ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
1,600 09/22/06
10/10/06
300 05 0001 / 5116
ON N WINNEBAGO AVE FROM W MOFFAT ST TO N WESTERN AVE
7.0
04/04/05
11/18/05
2,800 07/30/05
300 07 0032 / 5455
ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
1,600 09/22/06
300 09 / 33067
ON W BLOOMINGDALE AVE FROM N WINNEBAGO AVE TO N ROCKWELL ST
8.0
06/16/08
06/20/08
5.0
04/04/05
10.56
12/01/03
0
0
0
808
100
08/05/05
0
100
10/10/06
808
100
3,200 06/16/08
06/20/08
2,008
100
11/18/05
2,000 07/30/05
08/05/05
0
100
12/01/03
4,224 11/15/03
11/20/03
4,290
100
1,875 01/10/03
01/10/03
2,590
100
300 05 0001 / 5116
Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W CHESTNUT ST FROM N GREENVIEW AVE TO N ASHLAND AVE
300 06 0122 / 5275
ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE
300 06 0069 / 5233
ON W CORTEZ ST FROM N CAMPBELL AVE TO N CALIFORNIA AVE
300 07 0032 / 5455
ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE
7.50
04/18/06
11/18/06
3,000 09/22/06
10/10/06
1,515
100
300 05 0001 / 5116
ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST
4.0
04/04/05
11/18/05
1,600 07/30/05
08/05/05
0
100
300 05 0001 / 5116
ON W FRY ST FROM N GREENVIEW AVE TO N ASHLAND AVE
5.0
04/04/05
11/18/05
2,000 07/30/05
08/05/05
0
100
300 09 / 33067
ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE
3.50
06/16/08
06/20/08
1,400 06/16/08
06/20/08
879
100
300 07 0032 / 5455
Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST 3.50
04/18/06
11/18/06
1,400 09/22/06
10/10/06
707
100
300 07 0001 / 5424
ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE
5.0
04/18/06
11/18/06
2,200 04/18/06
11/18/06
2,200
100
300 05 0001 / 5116
ON W PEARSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE
5.0
04/04/05
11/18/05
2,000 07/30/05
08/05/05
0
100
300 07 0032 / 5455
ON W SUPERIOR ST FROM N LEAVITT ST TO N OAKLEY BLVD
2.0
04/18/06
11/18/06
800 09/22/06
10/10/06
404
100
300 09 / 33067
ON W THOMAS ST FROM N ROCKWELL ST TO N CALIFORNIA AVE
7.0
06/16/08
06/20/08
2,800 06/16/08
06/20/08
1,757
100
302 00 0092 / 5774
Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 1700 N CAMPBELL AVE
1.0
01/13/03
01/13/03
225 01/10/03
01/10/03
203
100
302 00 0092 / 5774
826 N PAULINA ST
1.0
02/09/03
02/09/03
225 02/07/03
02/07/03
203
100
302 00 0092 / 5774
1543 W CHESTNUT ST
1.0
0 01/30/01
01/30/01
203
100
302 00 0092 / 5774
2500 W CORTEZ ST
1.0
0 01/16/02
01/16/02
203
100
300 11 / 32190
2702 W CORTEZ ST
.0
0
0
5.0
03/01/07
12/31/07
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 4
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
210 06 0022 / 4297
2701-2753 W HADDON AVE
5.0
0 02/21/02
02/21/02
1,875
100
300 06 0069 / 5233
2701-2753 W HADDON AVE
5.0
1,875 02/21/02
02/21/02
1,875
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
135.06
50,899
31,853
Fixtures
300 03 0033 / 4904
ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE
6.30
03/10/05
03/20/05
2,520
300 07 0032 / 5455
ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
1,600 09/07/06
10/10/06
808
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
23.80
0
9,520
3,535
2,967,039
1,916,761
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 5
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0092 / 5774
835 N ASHLAND AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1010 N ASHLAND AVE
1.0
0 12/10/01
12/10/01
236
100
302 00 0092 / 5774
1216 N CLEAVER ST
1.0
0 10/19/01
10/19/01
236
100
805 06 1481 / 7667
1530 N ELK GROVE AVE
1.0
0 12/02/97
12/02/97
300
100
302 00 0092 / 5774
1306 N GREENVIEW AVE
1.0
0 12/14/01
12/14/01
236
100
302 00 0092 / 5774
1039 N HONORE ST
1.0
0 11/07/01
11/07/01
236
100
805 06 1868 / 8054
862 N MARSHFIELD AVE
1.0
09/29/95
09/29/95
0 09/29/95
09/29/95
300
100
805 06 1736 / 7922
1428 N MILWAUKEE AVE
1.0
06/11/97
06/11/97
0 06/11/97
06/11/97
300
100
300 06 0139 / 5289
2137 N MILWAUKEE AVE
1,080.0
03/01/06
09/01/06
26,704 05/22/06
06/01/06
32,631
100
805 06 1920 / 8106
1631 N MOZART ST
1.0
04/08/96
04/08/96
0 04/08/96
04/08/96
300
100
302 00 0092 / 5774
1216 N NOBLE ST
1.0
0 10/19/01
10/19/01
236
100
805 06 0447 / 6633
2145 N STAVE ST
1.0
0 06/01/95
06/01/95
300
100
302 00 0092 / 5774
1403 N WICKER PARK AVE
1.0
0 08/22/01
08/22/01
236
100
805 06 1737 / 7923
1501 N WICKER PARK AVE
1.0
0 06/11/97
06/11/97
300
100
302 00 0092 / 5774
1053 N WINCHESTER AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1142 N WOLCOTT AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1339 N WOLCOTT AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1100 N WOOD ST
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1208 N WOOD ST
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1506 N WOOD ST
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
2735 W ARMITAGE AVE
1.0
0 05/08/01
05/08/01
236
100
302 00 0092 / 5774
1600 W BEACH AVE
1.0
0 03/26/01
03/26/01
236
100
302 00 0092 / 5774
1632 W BEACH AVE
1.0
0 10/19/01
10/19/01
236
100
302 00 0092 / 5774
1607 W CHICAGO AVE
1.0
0 10/19/01
10/19/01
236
100
302 00 0092 / 5774
1855 W CHICAGO AVE
1.0
0 07/17/01
07/17/01
236
100
302 00 0092 / 5774
1424 W DIVISION ST
1.0
0 10/19/01
10/19/01
236
100
805 06 2086 / 8272
1652 W DIVISION ST
1.0
0 08/28/96
08/28/96
300
100
302 00 0092 / 5774
1807 W DIVISION ST
1.0
0 10/19/01
10/19/01
236
100
302 00 0092 / 5774
2006 W DIVISION ST
1.0
0 03/29/01
03/29/01
236
100
805 06 1775 / 7961
2006 W DIVISION ST
1.0
0 04/16/97
04/16/97
300
100
302 00 0092 / 5774
1901 W ERIE ST
1.0
0 12/10/01
12/10/01
236
100
12/02/97
06/01/95
06/11/97
08/28/96
04/16/97
12/02/97
06/01/95
06/11/97
08/28/96
04/16/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 6
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0092 / 5774
2344 W ERIE ST
1.0
805 06 1139 / 7325
2654 W HOMER ST
1.0
302 00 0092 / 5774
2330 W HURON ST
1.0
805 06 1914 / 8100
2624 W NORTH AVE
1.0
03/08/96
805 06 1915 / 8101
2634 W NORTH AVE
1.0
11/16/95
302 00 0092 / 5774
1635 W PIERCE AVE
1.0
805 06 0584 / 6770
2725 W PRINDIVILLE ST
1.0
06/01/95
805 06 0450 / 6636
1701 W SUPERIOR ST
1.0
10/04/95
302 00 0092 / 5774
2026 W SUPERIOR ST
302 00 0092 / 5774
0 12/10/01
12/10/01
236
100
0 03/23/95
03/23/95
300
100
0 12/10/01
12/10/01
236
100
03/08/96
0 03/08/96
03/08/96
300
100
11/16/95
0 11/16/95
11/16/95
300
100
0 11/28/01
11/28/01
236
100
06/01/95
0 06/01/95
06/01/95
300
100
10/04/95
0 10/04/95
10/04/95
300
100
1.0
0 06/27/01
06/27/01
236
100
1814 W THOMAS ST
1.0
0 11/28/01
11/28/01
236
100
805 06 1690 / 7876
2637 W THOMAS ST
1.0
07/02/97
07/02/97
0 07/02/97
07/02/97
300
100
805 06 0365 / 6551
2219 W WABANSIA AVE
1.0
08/29/96
08/29/96
0 08/29/96
08/29/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
2058 N WESTERN AVE
Work Type: Arterial Strt Lighting/Lamps
03/23/95
03/23/95
1,122.0
26,704
43,503
Lamps 1,540.0
06/01/07
12/31/07
45,337 07/01/07
09/01/07
45,337
100
3,500 11/21/06
11/21/06
Blocks
300 07 0001 / 5424
ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE
.50
04/18/06
11/18/06
0
100
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
.0
03/01/06
12/31/06
0
0
0
300 11 / 32190
2702 W CORTEZ ST
.0
03/01/07
12/31/07
0
0
0
3,500
0
Totals per Arterial Strt Lighting/Lamps
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1951 W DIVISION ST
.50
Installations 1,510.0
0 05/08/02
05/11/02
27,494
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 7
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install 300 06 0198 / 5323
LATHROP HOMES
300 06 0167 / 5306
N FRANCISCO AVE AND W WABANSIA AVE
300 06 0167 / 5306
Fixtures 215,250 03/29/01
04/04/01
67,170
100
2.50
0 06/01/99
06/01/99
539
100
2600 N HOYNE AVE
2.0
0 05/19/99
05/19/99
702
100
302 00 0092 / 5774
1701 N MOZART ST
1.0
0 03/14/01
03/14/01
471
100
302 00 0092 / 5774
2215 W NORTH AVE
1.0
0 03/16/01
03/16/01
471
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
03/12/01
6.50
.0
Work Type: Lighting Imprvmnts
Installations
2717 N ELSTON AVE
.0
Work Type: Lighting Imprvmnts
Projects
300 06 0117 / 5271
2800 N DAMEN AVE
Work Type: Loop Lighting 281 00 / 33670
2717 N ELSTON AVE
Work Type: Ornamental - Piggyback Lighting
215,250
69,353
Blocks
2717 N ELSTON AVE
281 00 / 33670
04/10/01
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
4,000
0
0
0
0
1.0
Blocks .0
01/01/08
12/31/08
Fixtures
300 07 0032 / 5455
ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
5,400 09/22/06
10/10/06
3,425
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 11 / 32222
ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST
13.86
11/01/07
12/01/07
18,843 03/13/08
04/04/08
17,538
100
300 06 0122 / 5275
ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE
10.56
12/01/03
12/06/03
14,256 11/28/03
12/04/03
14,709
100
Totals per Ornamental - Piggyback Lighting
41.92
56,724
47,231
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 8
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting
Blocks
300 11 / 32190
ON N ASHLAND AVE FROM W DIVISION ST TO N MILWAUKEE AVE
2.0
06/20/07
07/03/07
13,000 06/20/07
07/03/07
10,342
100
300 11 / 32190
ON N MILWAUKEE AVE FROM N PAULINA ST TO N DAMEN AVE
2.0
08/27/07
09/27/07
150,000 08/27/07
09/07/07
149,999
100
300 06 0119 / 5273
1200 N ASHLAND AVE
1.0
06/01/99
12/01/99
160,000 05/13/99
12/14/99
123,364
100
281 00 / 33670
2717 N ELSTON AVE
.0
01/01/08
12/31/08
0
0
0
300 11 / 32190
2702 W CORTEZ ST
.0
03/01/07
12/31/07
0
0
0
323,000
283,705
Totals per Ornamental Lighting
Work Type: POD Camera Pole 281 00 / 33670
2717 N ELSTON AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
2058 N WESTERN AVE
5.0
Poles .0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Lamps .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 9
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 11 / 32190
ON N DAMEN AVE FROM W SCHILLER ST TO W EVERGREEN AVE
1.0
05/30/07
07/20/07
58,750 05/30/07
07/17/07
36,740
100
300 11 / 32190
ON N HONORE ST FROM N WICKER PARK AVE TO N MILWAUKEE AVE
1.0
05/30/07
07/20/07
48,750 05/30/07
07/17/07
36,740
100
300 11 / 32190
ON N HONORE ST FROM W DIVISION ST TO W ELLEN ST
1.0
02/21/08
04/21/08
55,000
0
0
300 11 / 32190
ON N MARION CT FROM W DIVISION ST TO W ELLEN ST
1.0
02/21/08
04/21/08
55,000
0
0
300 07 0001 / 5424
ON N POINT ST FROM W ARMITAGE AVE TO W HENRY CT
1.0
06/28/06
08/31/06
65,000 07/07/06
10/24/06
65,000
100
300 06 0298 / 5405
ON N STAVE ST FROM W ARMITAGE AVE TO W FRANCIS PL
2.0
06/25/05
08/01/05
0 08/22/05
10/14/05
102,254
100
300 06 0308 / 5414
ON N STAVE ST FROM W FRANCIS PL TO N CALIFORNIA AVE
2.0
06/06/06
07/01/06
150,000 07/07/06
10/24/06
126,534
100
300 11 / 32190
ON N WICKER PARK AVE FROM N WOOD ST TO N DAMEN AVE
1.0
05/30/07
07/20/07
62,500 05/30/07
07/17/07
36,470
100
300 06 / 32146
ON N WOLCOTT AVE FROM W DIVISION ST TO N MILWAUKEE AVE
2.0
12/05/07
05/29/08
282,042
0
25
300 06 / 32277
ON N WOOD ST FROM W DIVISION ST TO N MILWAUKEE AVE
.0
05/04/08
12/31/08
0
0
0
300 07 0001 / 5424
ON W ATTRILL ST FROM N MILWAUKEE AVE TO N STAVE ST
1.0
06/28/06
08/31/06
32,000
100
300 06 / 32146
ON W CRYSTAL ST FROM N DAMEN AVE TO N WOLCOTT AVE
1.50
12/05/07
06/26/08
282,042
0
25
300 06 / 32277
ON W ELLEN ST FROM N WOOD ST TO N HERMITAGE AVE
.0
05/04/08
12/31/08
0
0
0
300 07 0001 / 5424
ON W EVERGREEN AVE FROM N MILWAUKEE AVE TO N DAMEN AVE
1.0
08/01/06
10/01/06
300 07 0001 / 5424
ON W FRANCIS PL FROM N MILWAUKEE AVE TO N POINT ST
1.0
06/28/06
08/31/06
300 06 / 32146
ON W POTOMAC AVE FROM N DAMEN AVE TO N WOLCOTT AVE
2.0
10/05/07
01/31/08
300 07 0001 / 5424
ON W PRINDIVILLE ST FROM N MILWAUKEE AVE TO N STAVE ST
1.0
06/28/06
08/31/06
300 07 0001 / 5424
ON W ST GEORGES CT FROM N MILWAUKEE AVE TO N STAVE ST
1.0
06/28/06
300 06 0308 / 5414
ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE
.50
300 11 / 32190
2702 W CORTEZ ST
.0
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 03 0001 / 4872
ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE
300 03 0035 / 4906
ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE
300 06 0235 / 5349
ON N WASHTENAW AVE FROM N ELSTON AVE TO W BELMONT AVE
300 06 0235 / 5349
32,000 07/07/06
10/24/06
85,000 09/11/06
11/15/06
87,303
100
39,000 07/07/06
10/24/06
39,000
100
02/18/08
0
100
32,000 07/07/06
10/24/06
32,000
100
08/31/06
32,000 07/07/06
10/24/06
32,000
100
03/09/06
05/09/06
49,164 03/09/06
04/28/06
31,842
100
03/01/07
12/31/07
0
0
0
1,610,290
657,883
21.0
282,042
Blocks 06/01/04
09/01/04
40,000 05/29/04
07/09/04
40,000
100
06/01/04
09/01/04
40,000 05/24/04
07/09/04
40,000
100
1.0
09/06/03
11/06/03
77,813 09/10/03
11/06/03
68,263
100
ON W FLETCHER ST FROM N ELSTON AVE TO N ROCKWELL ST
1.0
09/06/03
11/06/03
77,813 09/10/03
11/06/03
68,264
100
300 06 0267 / 5375
ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE
1.0
07/20/04
09/20/04
80,185 07/12/04
10/15/04
90,227
100
300 03 0032 / 4903
ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST
1.50
10/01/04
12/15/04
92,500 10/08/04
01/21/05
42,715
100
Totals per Residntl Strt Lighting/Lamps
.50
5.0
408,311
349,469
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 10
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Arterial 281 00 / 33670
Locations
2717 N ELSTON AVE
Work Type: Short Arm Installs - Residntl 281 00 / 33670
2717 N ELSTON AVE
302 00 0092 / 5774
2000 W SUPERIOR ST
.0
12/31/08
0
01/01/08
12/31/08
0
0
0
Locations .0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
01/01/08
3.0
0 01/03/01
3.0
0
01/03/01
0
0
1,135
100
1,135
Locations
300 11 / 32190
ON N ASHLAND AVE FROM N MILWAUKEE AVE TO W DIVISION ST
13.0
06/20/07
06/20/07
3,250 07/03/07
300 03 0033 / 4904
ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE
7.49
03/01/05
03/20/05
1,988
300 07 0001 / 5424
ON N ELK GROVE AVE FROM N WOOD ST TO W NORTH AVE
11.0
04/18/06
11/18/06
1,200 06/01/06
06/10/06
0
100
300 07 0001 / 5424
ON N WASHTENAW AVE FROM W ALTGELD ST TO W FULLERTON AVE
5.0
09/21/06
09/28/06
1,000 08/22/06
08/22/06
721
100
300 04 0216 / 5114
ON N WESTERN AVE FROM W BLOOMINGDALE AVE TO W HOMER ST
19.0
05/01/06
11/01/06
4,110 05/17/06
07/24/06
4,110
100
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
.0
03/01/06
12/31/06
300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
4.95
05/15/07
06/01/07
1,089 05/15/07
300 05 0001 / 5116
ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST
31.0
04/04/05
11/18/05
300 07 0001 / 5424
ON W HURON ST FROM N ASHLAND AVE TO N WOOD ST
9.0
04/18/06
11/18/06
300 07 0001 / 5424
ON W LE MOYNE ST FROM N DAMEN AVE TO N HOYNE AVE
5.0
04/18/06
11/18/06
300 11 / 32190
2702 W CORTEZ ST
.0
03/01/07
12/31/07
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
2717 N ELSTON AVE
Work Type: Strt Lighting
105.44
07/03/07
2,600
100
0
0
0
0
06/01/07
1,089
100
6,200 07/25/05
08/20/05
4,415
100
1,800 06/01/06
07/01/06
0
0
1,000
0
0
0
0
0
21,637
12,935
0
0
0
Blocks .0
01/01/08
12/31/08
Blocks
300 06 0111 / 5266
ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE
.52
08/01/00
09/30/00
0 11/01/98
12/15/98
5,504
100
300 03 0001 / 4872
2700 N ARTESIAN AVE
1.0
10/15/04
10/25/04
2,075 10/15/04
10/15/04
1,348
100
300 06 0117 / 5271
2033-2049 W DIVERSEY AVE
.50
13,110 10/23/99
11/30/99
9,425
2.02
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
2137 N MILWAUKEE AVE
15,185
16,277
Lamps 1,712.0
03/01/04
12/01/04
8,902 09/26/06
09/28/06
18,644
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 11
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2788 / 8974
1799 N ARTESIAN AVE
6.0
03/31/94
03/31/94
0 03/31/94
03/31/94
4,500
100
805 06 2928 / 9114
1795 N CALIFORNIA AVE
6.0
03/18/94
03/18/94
0 03/18/94
03/18/94
4,500
100
805 06 2300 / 8486
2895 N CALIFORNIA AVE
12.0
06/20/96
06/20/96
0 06/20/96
06/20/96
9,000
100
805 06 2789 / 8975
1799 N CAMPBELL AVE
6.0
06/01/94
06/01/94
0 06/01/94
06/01/94
4,500
100
300 06 0217 / 5337
3181 N ELSTON AVE
193.0
12/29/03
01/09/04
10,848 12/30/03
01/02/04
14,760
100
805 06 2744 / 8930
1798 N FAIRFIELD AVE
6.0
06/09/94
06/09/94
0 06/09/94
06/09/94
4,500
100
805 06 2790 / 8976
1799 N MAPLEWOOD AVE
6.0
04/07/94
04/07/94
0 04/07/94
04/07/94
4,500
100
805 06 2765 / 8951
1774 N MILWAUKEE AVE
10.0
04/22/94
04/22/94
0 04/22/94
04/22/94
7,500
100
805 06 2362 / 8548
1795 N ROCKWELL ST
10.0
10/03/95
10/03/95
0 10/03/95
10/03/95
7,500
100
805 06 2476 / 8662
1795 N TALMAN AVE
10.0
10/06/95
10/06/95
0 10/06/95
10/06/95
7,500
100
805 06 2743 / 8929
1798 N WASHTENAW AVE
6.0
06/01/94
06/01/94
0 06/01/94
06/01/94
4,500
100
805 06 2223 / 8409
1798 N WESTERN AVE
6.0
12/09/96
12/09/96
0 12/09/96
12/09/96
4,500
100
805 06 2640 / 8826
1798 N WINNEBAGO AVE
8.0
12/14/94
12/14/94
0 12/14/94
12/14/94
6,000
100
302 00 0071 / 5759
2600 W DIVERSEY AVE
0 10/20/98
10/28/98
10,473
100
805 06 2363 / 8549
2640 W DIVERSEY AVE
300 06 0099 / 5260
1951 W DIVISION ST
302 00 0070 / 5758
2200 W FULLERTON AVE
302 00 0072 / 5760
2200 W FULLERTON AVE
302 00 0071 / 5759
2430 W LOGAN BLVD
805 06 2711 / 8897
2301 W MOFFAT ST
6.0
12/31/91
805 06 2421 / 8607
1525 W NORTH AVE
14.0
10/01/91
Totals per Underpass Lighting
12.0
06/01/92
06/01/92
0 06/01/92
06/01/92
9,000
100
2,792.0
06/01/03
07/09/03
156,932 07/01/03
07/10/03
103,719
100
0 06/12/97
06/19/97
14,272
100
0 09/28/99
10/19/99
38,301
100
0 03/01/98
03/26/98
33,883
100
12/31/91
0 12/31/91
12/31/91
4,500
100
10/01/91
0 10/01/91
10/01/91
10,500
100
1.0
3,110.0
167,780
308,408
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 12
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N ELSTON AVE AND N LEAVITT ST
.50
0 10/24/02
10/24/02
5,037
100
210 06 0219 / 4459
N WESTERN AVE AND N MILWAUKEE AVE
1.0
03/31/05
04/01/05
10,563 04/01/05
04/01/05
10,489
100
210 06 0219 / 4459
N WESTERN AVE AND W ARMITAGE AVE
.50
04/01/05
04/02/05
5,282 04/07/05
04/07/05
4,523
100
210 06 0219 / 4459
N WESTERN AVE AND W CHICAGO AVE
.50
04/15/05
04/15/05
5,282 04/10/05
04/10/05
4,004
100
210 06 0219 / 4459
N WESTERN AVE AND W DIVISION ST
.50
03/28/05
03/29/05
5,282 03/16/05
03/16/05
5,042
100
210 06 0219 / 4459
N WESTERN AVE AND W FULLERTON AVE
.50
04/04/05
04/05/05
5,282 03/25/05
03/25/05
4,523
100
210 06 0219 / 4459
N WESTERN AVE AND W NORTH AVE
1.0
03/30/05
03/31/05
10,563 03/04/05
03/04/05
8,008
100
210 06 0219 / 4459
N WESTERN AVE AND W POTOMAC AVE
.50
03/29/05
03/30/05
5,282 03/08/05
03/08/05
3,824
100
210 06 0219 / 4459
N WESTERN AVE AND W SCHUBERT AVE
1.0
04/07/05
04/08/05
10,563 03/10/05
03/10/05
8,527
100
210 06 0219 / 4459
W LOGAN BLVD AND N WESTERN AVE
1.0
04/06/05
04/07/05
10,563 03/18/05
03/18/05
15,333
100
7.0
Totals per LED Signal Head Install
Work Type: New Signal
68,660
69,309
Locations
210 06 0171 / 4420
N ASHLAND AVE AND W DIVISION ST
1.0
07/09/07
08/08/07
138,240 05/01/07
05/25/07
117,195
100
300 11 / 32190
W CHICAGO AVE AND N WOLCOTT AVE
1.0
10/01/07
12/01/07
300,000 01/10/08
07/21/08
265,845
100
300 11 / 32190
2702 W CORTEZ ST
.0
03/01/07
12/31/07
0
0
0
438,240
383,040
2.0
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
N ASHLAND AVE AND W CHICAGO AVE
210 06 0240 / 4477
10713013 Note Last Updated on 03-APR-08 N ASHLAND AVE AND W DIVISION ST
Locations .0
03/15/06
05/08/07
6,000 01/26/07
02/09/07
2,994
100
8.0
11/01/05
06/22/07
15,000 11/01/05
10/03/06
10,562
100
Completed by Operations Division on 10/3/06 Note Last Updated on 30-MAY-07 Totals per Pedestrian Countdown Signal Install
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N OAKLEY AVE AND W DIVISION ST
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
1514 N ASHLAND AVE
8.0
21,000
13,556
Crossings .50
2,000 07/11/01
07/12/01
131
100
0 09/20/03
10/01/03
5,376
100
Intersections 34.0
10/01/03
10/08/03
574,184
1,305,586
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 13
1/1/2008 AND 12/31/2008
Ward 01 Manuel Flores CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
300 06 0199 / 5324
N WESTERN AVE AND W POTOMAC AVE
.50
9,573 02/26/01
04/27/01
79,240
100
300 09 / 33067
W CHICAGO AVE AND N WOLCOTT AVE
1.0
08/19/08
08/29/08
32,000 08/19/08
08/29/08
32,000
100
814 06 0153 / 16367
1200 N CLEAVER ST
1.0
09/03/96
09/03/96
0 09/03/96
09/03/96
87,656
100
814 06 0283 / 16495
2700 N ELSTON AVE
1.0
11/29/91
11/29/91
0 11/29/91
11/29/91
123,207
100
814 06 0284 / 16496
2800 N ELSTON AVE
1.0
12/04/91
12/04/91
0 12/04/91
12/04/91
123,207
100
814 06 0285 / 16497
3000 N ELSTON AVE
1.0
12/06/91
12/06/91
0 12/06/91
12/06/91
123,207
100
814 06 0201 / 16413
3000 N LEAVITT ST
1.0
03/17/92
03/17/92
0 03/17/92
03/17/92
106,743
100
300 06 0117 / 5271
1200 N NOBLE ST
1.0
814 06 0051 / 16268
2667 W DIVERSEY AVE
1.0
03/02/95
03/02/95
0 03/02/95
03/02/95
61,595
100
814 06 0086 / 16302
2668 W DIVERSEY AVE
1.0
09/28/94
09/28/94
0 09/28/94
09/28/94
49,756
100
814 06 0122 / 16336
1500 W NORTH AVE
1.0
09/13/93
09/13/93
0 09/13/93
09/13/93
46,166
100
2,000
10.50
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
300 05 0001 / 5116
ON W CORTLAND ST FROM N WESTERN TO N ROCKWELL ST
300 11 / 32190
2702 W CORTEZ ST
686
43,573
833,463
Locations 1.65
05/15/07
06/01/07
512 05/15/07
06/01/07
512
100
1.0
04/04/05
11/18/05
200 07/25/05
08/20/05
200
100
.0
03/01/07
12/31/07
0
0
0
712
712
Totals per Construction Phase
3,541,223
3,222,347
Totals for Ward 01
3,554,673
3,233,475
Totals per Traffic Equipment Painting
2.65
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 14
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0300 / 5407
ABLA HOMES (CHA)
300 06 0289 / 5396
ROCKWELL GARDENS
300 05 0002 / 5117
Projects .0
01/15/05
04/15/05
0 01/15/05
09/30/05
23,208
100
1.0
12/01/04
02/28/05
0 12/01/04
07/26/06
1,984
100
ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST
.0
08/06/06
08/07/06
0 08/06/06
08/07/06
0
0
300 06 0308 / 5414
ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,389
100
300 06 0308 / 5414
ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
274
100
300 05 0002 / 5117
ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST
.0
08/06/06
08/07/06
0 08/06/06
08/07/06
0
0
210 06 0240 / 4477
E VAN BUREN ST AND S MICHIGAN AVE
.0
10/10/05
07/31/06
1,200 10/10/05
09/13/06
940
100
300 06 0292 / 5399
S CANAL ST AND W 14TH PL
1.0
5,000 04/26/05
12/10/05
1,065
100
210 06 0209 / 4452
S CANAL ST AND W ROOSEVELT RD
1.0
07/01/04
12/31/04
0 07/01/04
12/31/04
4,921
100
210 06 0240 / 4477
S CLARK ST AND W CONGRESS PKWY
.0
10/10/05
07/31/06
1,200 10/10/05
02/15/06
235
100
300 06 0292 / 5399
S JEFFERSON ST AND W 14TH PL
210 06 0207 / 4450
S MICHIGAN AVE AND E JACKSON BLVD
.0
07/01/04
12/30/04
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
300 06 0278 / 5386
1400 S BLUE ISLAND AVE
.0
07/01/04
09/30/04
300 06 0292 / 5399
1101 S CANAL ST
1.0
02/03/05
03/08/05
2,000 01/13/05
300 06 0292 / 5399
607 S JEFFERSON ST
1.0
03/03/05
03/10/05
1,500 03/03/05
300 06 0292 / 5399
1240 S LEAVITT ST
1.0
03/15/05
03/19/05
3,000 03/15/05
300 06 0292 / 5399
610 S MICHIGAN AVE
1.0
300 06 0292 / 5399
1620 S MICHIGAN AVE
1.0
300 06 0292 / 5399
409 S MORGAN ST
1.0
300 06 0282 / 5390
1600 S PRAIRIE AVE
1.0
12/06/04
300 06 0292 / 5399
225 S SANGAMON ST
1.0
300 06 0292 / 5399
1255 S STATE ST
300 06 0282 / 5390
1,454
25
460
100
0
0
0
0
0
0
835
80
03/10/05
979
100
05/11/05
1,274
100
4,000 07/25/05
08/31/05
0
100
1,000 10/24/04
10/28/04
336
100
1,000 06/06/05
07/22/05
603
100
01/05/05
3,000 12/01/04
03/09/05
2,707
100
05/26/05
07/19/05
1,500 05/26/05
07/19/05
634
100
1.0
07/25/05
07/25/05
2,000 07/25/05
07/25/05
896
100
550 W ADAMS ST
.0
08/20/04
12/31/04
1,000 08/20/04
12/31/04
1,000
100
300 06 0292 / 5399
550 W ADAMS ST
.0
01/20/05
12/21/05
0 01/20/05
01/17/06
0
100
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
300 06 0292 / 5399
520 W ROOSEVELT RD
.0
01/24/05
03/01/05
1,500 01/24/05
04/15/05
0
0
150 06 / 32900
1065-1400 W ROOSEVELT RD
.0
12/06/06
08/24/07
66,000 05/16/07
10/11/07
50,000
100
Totals per Design/Engineering
1.0
13.0
3,000 04/16/05
10/24/04
10/28/04
750 09/02/04
98,650
09/10/04
96,194
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 15
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0002 / 5425
ON S INDIANA AVE FROM E 16TH ST TO E 18TH ST
4.0
04/18/06
11/18/06
1,400
0
0
300 07 0002 / 5425
ON S MICHIGAN AVE FROM E 16TH ST TO E 18TH ST
4.0
04/18/06
11/18/06
1,400
0
0
Totals per 250 Watt Changeout Totals per Lighting/Electrical
8.0
2,800
0
5,938,898
4,502,081
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 16
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 09 / 33068
ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE
3.0
01/28/09
02/02/09
1,200 01/28/09
02/02/09
958
100
300 09 / 33068
ON E 14TH PL FROM S STATE ST TO S WABASH AVE
2.0
01/28/09
02/02/09
800 01/28/09
02/02/09
644
100
300 09 / 33068
ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE
4.0
05/27/08
06/13/08
1,600 07/09/08
07/10/08
1,283
100
300 09 / 33068
ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
06/16/08
06/20/08
400 07/18/08
09/02/08
322
100
300 09 / 33068
MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
06/16/08
06/20/08
400 07/18/08
07/21/08
322
100
300 09 / 33068
MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
8.16
05/28/08
06/20/08
3,400 05/28/08
06/06/08
2,555
100
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
8.60
05/28/08
06/20/08
3,612 04/01/08
12/01/08
2,692
100
300 09 / 33068
ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE
9.0
05/29/08
06/20/08
3,600 07/09/08
07/10/08
2,880
100
300 09 / 33068
ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST
9.0
05/29/08
06/20/08
3,600 07/09/08
07/10/08
2,880
100
300 09 / 33068
ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST
4.0
06/02/08
06/13/08
1,800 06/02/08
06/05/08
1,288
100
300 06 0251 / 5361
ON S CLINTON ST FROM W HARRISON ST TO W POLK ST
12.0
08/15/05
08/20/05
4,800 08/10/05
08/15/05
5,037
100
300 09 / 33068
ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST
3.0
10/15/08
10/17/08
1,200 10/15/08
10/17/08
966
100
300 09 / 33068
ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST
17.0
03/28/08
04/04/08
6,800 03/28/08
04/04/08
5,474
100
300 09 / 33068
ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST
12.0
300 09 / 33068
ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST
15.0
12/17/08
01/23/09
6,000 12/17/08
300 09 / 33068
ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST
300 09 / 33068
ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST
300 06 0225 / 5340
ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD
300 06 0251 / 5361
ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST
300 09 / 33068
ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST
300 09 / 33068
4,800
0
0
01/23/09
4,830
100
8.0
03/28/08
04/04/08
3,200 03/28/08
04/04/08
2,576
100
7.38
05/29/08
06/20/08
2,952 04/01/08
12/01/08
2,310
100
100.0
09/01/03
09/10/03
40,000 09/02/03
09/09/03
32,580
100
13.0
08/15/05
08/20/05
5,200 08/10/05
08/15/05
5,037
100
9.0
12/01/08
12/09/08
3,600 12/01/08
12/03/08
3,398
100
ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD
13.0
01/05/09
01/30/09
5,200 01/12/09
01/22/09
6,434
100
300 07 0002 / 5425
ON S MICHIGAN AVE FROM E ROOSEVELT RD TO E 14TH ST
12.0
04/18/06
11/18/06
5,150 06/21/06
06/21/06
0
100
300 06 0122 / 5275
ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST
6.0
08/01/04
08/15/04
2,500 06/10/04
06/10/04
1,506
100
300 09 / 33068
ON S WABASH AVE FROM E 23RD ST TO E 24TH PL
5.0
06/16/08
06/20/08
2,000 06/16/08
06/20/08
1,610
100
300 09 / 33068
ON S WABASH AVE FROM E 29TH ST TO E 30TH ST
5.0
06/16/08
06/20/08
2,000 07/10/08
07/15/08
1,610
100
300 09 / 33068
MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST
3.0
06/09/08
06/13/08
1,400 06/09/08
06/13/08
966
100
300 09 / 33068
ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY
25.0
12/08/08
12/29/08
10,000 12/08/08
12/29/08
8,561
100
300 09 / 33068
ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD
4.50
06/09/08
06/13/08
1,800 06/09/08
06/13/08
1,449
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 17
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 09 / 33068
ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE
17.0
12/18/08
01/08/09
6,800 12/18/08
01/08/09
3,719
100
300 09 / 33068
ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST
12.0
01/08/09
02/20/09
4,800 01/08/09
02/20/09
4,760
100
300 06 0251 / 5361
ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST
13.0
08/15/05
08/20/05
5,200 08/10/05
08/15/05
5,037
100
300 07 0002 / 5425
ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD
42.0
04/18/06
11/18/06
17,150 10/20/06
10/21/06
0
100
300 09 / 33068
ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST
10.0
07/07/08
07/11/08
4,000 07/07/08
07/11/08
3,220
100
300 06 0251 / 5361
ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST
13.0
08/15/05
08/20/05
5,200 08/10/05
08/15/05
5,037
100
300 09 / 33068
ON W POLK ST FROM S DEARBORN ST TO S CLARK ST
1.0
03/28/08
04/04/08
414 03/28/08
04/04/08
322
100
300 09 / 33068
ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE
2.0
10/13/08
10/17/08
800 10/06/08
10/08/08
800
100
300 09 / 33091
ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST
4.0
02/01/08
12/31/08
1,600 09/08/08
09/09/08
1,328
100
300 09 / 33068
ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE
7.0
06/09/08
06/13/08
3,000 06/09/08
06/13/08
2,254
100
300 09 / 33068
1400-1500 S LOOMIS ST
6.0
06/30/08
07/01/08
2,400 08/07/08
08/12/08
1,932
100
Totals per 400 Watt Changeout
446.64
180,378
128,577
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 18
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0095 / 5777
ON S STATE ST FROM E VAN BUREN ST TO W CONGRESS PKWY
17.0
12,750 04/11/01
04/16/01
16,763
100
302 00 0092 / 5774
ON W WASHBURNE AVE FROM S DAMEN AVE TO S LEAVITT ST
9.0
0 04/03/01
04/04/01
2,121
100
302 00 0095 / 5777
72 E ROOSEVELT DR
5.0
3,750 12/05/97
12/09/97
4,542
100
805 06 0749 / 6935
1300 S ASHLAND AVE
1.0
10/26/95
10/26/95
0 10/26/95
10/26/95
300
100
805 06 1521 / 7707
615 S CALIFORNIA AVE
1.0
10/31/97
10/31/97
0 10/31/97
10/31/97
300
100
805 06 1522 / 7708
625 S CALIFORNIA AVE
1.0
10/31/97
10/31/97
0 10/31/97
10/31/97
300
100
302 00 0095 / 5777
520 S FEDERAL ST
8.0
6,000 11/19/97
11/19/97
7,267
100
302 00 0095 / 5777
130 S FRANKLIN ST
3.0
2,250 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
230 S FRANKLIN ST
1.0
750 10/23/02
10/29/02
400
100
805 06 1190 / 7376
1320 S INDIANA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1191 / 7377
1340 S INDIANA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1192 / 7378
1360 S INDIANA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1542 / 7728
1603 S INDIANA AVE
1.0
10/23/97
10/23/97
0 10/23/97
10/23/97
300
100
805 06 1543 / 7729
1607 S INDIANA AVE
1.0
10/23/97
10/23/97
0 10/23/97
10/23/97
300
100
302 00 0095 / 5777
410 S MICHIGAN AVE
14.0
10,500 06/14/00
06/20/00
6,481
100
302 00 0095 / 5777
600 S MICHIGAN AVE
6.0
4,500 11/29/97
12/03/97
5,671
100
302 00 0095 / 5777
820 S MICHIGAN AVE
3.0
2,250 11/10/97
11/19/97
4,052
100
302 00 0095 / 5777
1100 S MICHIGAN AVE
3.0
2,250 05/30/00
05/30/00
1,517
100
302 00 0092 / 5774
1402 S MICHIGAN AVE
1.0
0 10/31/01
10/31/01
236
100
302 00 0092 / 5774
1416 S MICHIGAN AVE
1.0
0 10/31/01
10/31/01
236
100
302 00 0092 / 5774
1456 S MICHIGAN AVE
1.0
0 10/31/01
10/31/01
236
100
302 00 0092 / 5774
1504-1522 S MICHIGAN AVE
3.0
0 10/31/01
10/31/01
707
100
302 00 0092 / 5774
2740 S MICHIGAN AVE
1.0
0 02/07/01
02/07/01
236
100
300 06 0078 / 5241
1200 S STATE ST
21,675 11/06/02
11/14/02
21,661
100
302 00 0095 / 5777
819 S WABASH AVE
3.0
2,250 11/10/97
11/19/97
4,052
100
302 00 0092 / 5774
1235 S WABASH AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1243 S WABASH AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1259 S WABASH AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1301 S WABASH AVE
1.0
0 11/28/01
11/28/01
236
100
302 00 0092 / 5774
1423 S WABASH AVE
1.0
0 10/31/01
10/31/01
236
100
302 00 0092 / 5774
1439 S WABASH AVE
1.0
0 10/31/01
10/31/01
236
100
28.0
11/06/02
11/14/02
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 19
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0380 / 6566
2102 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0381 / 6567
2134 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
302 00 0095 / 5777
402 S WELLS ST
1.0
750 10/23/02
10/29/02
400
100
302 00 0095 / 5777
405 S WELLS ST
6.0
4,500 11/17/97
11/17/97
5,892
100
302 00 0095 / 5777
408 S WELLS ST
1.0
750 10/23/02
10/29/02
400
100
302 00 0095 / 5777
420 S WELLS ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0092 / 5774
1330 W FILLMORE ST
1.0
0 09/19/01
09/19/01
236
100
302 00 0092 / 5774
1359 W FILLMORE ST
1.0
0 09/19/01
09/19/01
236
100
302 00 0092 / 5774
1421 W FILLMORE ST
1.0
0 09/19/01
09/19/01
236
100
302 00 0092 / 5774
1439-1447 W FILLMORE ST
2.0
0 10/01/01
10/01/01
471
100
805 06 1978 / 8164
1000 W MONROE ST
1.0
09/13/96
09/13/96
0 09/13/96
09/13/96
300
100
805 06 1979 / 8165
1020 W MONROE ST
1.0
09/13/96
09/13/96
0 09/13/96
09/13/96
300
100
805 06 0425 / 6611
1401 W TAYLOR ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0426 / 6612
1431 W TAYLOR ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
302 00 0092 / 5774
2060 W WASHINGTON BLVD
1.0
0 02/27/01
02/27/01
236
100
302 00 0092 / 5774
2160 W WASHINGTON BLVD
1.0
0 02/27/01
02/27/01
236
100
805 06 0500 / 6686
2704 W WASHINGTON BLVD
1.0
10/23/96
10/23/96
0 10/23/96
10/23/96
300
100
805 06 0382 / 6568
2936 W WASHINGTON BLVD
1.0
04/21/95
04/21/95
0 04/21/95
04/21/95
300
100
302 00 0092 / 5774
2010 W WASHINGTON ST
1.0
0 01/17/01
01/17/01
236
100
302 00 0092 / 5774
2118 W WASHINGTON ST
1.0
0 02/27/01
02/27/01
236
100
302 00 0092 / 5774
2134 W WASHINGTON ST
1.0
0 02/27/01
02/27/01
236
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
1234 S MICHIGAN AVE
149.0
76,425
93,445
Lamps 5,217.0
06/01/07
12/31/07
153,588 09/01/07
09/15/07
0
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 20
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 06 0198 / 5323
ABLA HOMES (CHA)
03/04/01
03/24/01
92,650 03/14/01
03/24/01
80,334
100
300 06 0198 / 5323
HARRISON COURTS
02/24/01
05/24/01
12,506 05/31/01
05/31/01
6,400
100
300 06 0198 / 5323
LOOMIS COURTS
03/05/01
03/30/01
46,258 03/26/01
03/29/01
28,420
100
300 06 0198 / 5323
ROCKWELL GARDENS
02/20/01
03/08/01
71,050 03/01/01
03/13/01
52,194
100
300 07 0042 / 5465
ON W MADISON ST FROM WACKER DR TO CANAL ST
01/10/07
01/31/07
500
100
300 06 0167 / 5306
W JACKSON BLVD AND S FRANCISCO AVE
302 00 0092 / 5774
1.0
500
1.50
0 12/08/99
12/08/99
527
100
1020 S CLINTON ST
1.0
0 05/11/01
05/11/01
471
100
302 00 0092 / 5774
558 W DE KOVEN ST
1.0
0 05/11/01
05/11/01
471
100
302 00 0092 / 5774
560 W DE KOVEN ST
1.0
0 05/11/01
05/11/01
471
100
302 00 0092 / 5774
521 W TAYLOR ST
1.0
0 05/11/01
05/11/01
471
100
302 00 0092 / 5774
529 W TAYLOR ST
1.0
0 05/11/01
05/11/01
471
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
7.50
222,964
170,730
Blocks
302 00 0094 / 5776
ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE
565,355
100
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
150 06 / 32900
1065-1400 W ROOSEVELT RD
.0
08/21/07
12/30/10
0
35
Totals per Lighting Imprvmnts
3.0
3.0
0 03/08/98
998,725 10/15/07 998,725
08/01/99
565,355
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 21
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts
Installations .0
05/01/05
12/31/05
1,100,000 03/25/05
10/17/06
736,191
100
1.0
08/01/05
12/31/06
150,000 08/01/05
12/31/06
91,855
100
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
300 06 0278 / 5386
1400 S BLUE ISLAND AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
607 S JEFFERSON ST
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
not issued Note Last Updated on 01-NOV-07 607 Jefferson was constructed by private contractor. Job cannot be marked complete until material loaned to contractor by BOE is returned to BOE inventory. Note Last Updated on 17-JAN-07 12/31/05 0 03/01/05 12/31/05 0 .0 03/01/05 1240 S LEAVITT ST
0
300 06 0292 / 5399
610 S MICHIGAN AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
Still open for construction Note Last Updated on 01-NOV-07 1620 S MICHIGAN AVE
.0
03/01/05
12/31/05
10,217 09/05/05
10/05/05
9,309
100
300 06 0292 / 5399
409 S MORGAN ST
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
Not construction job Note Last Updated on 01-NOV-07 225 S SANGAMON ST
.0
03/01/05
12/31/05
7,008 10/12/05
10/18/05
7,790
100
300 06 0292 / 5399
1255 S STATE ST
.0
03/01/05
12/31/05
9,473 01/03/06
03/18/06
3,262
100
300 06 0282 / 5390
550 W ADAMS ST
.0
10/06/04
10/31/07
0 10/06/04
03/11/05
12,996
100
300 06 0292 / 5399
550 W ADAMS ST
1.0
02/17/05
03/15/06
143,600 02/17/05
03/15/06
141,332
100
281 00 / 33670
Project has been completed.(100%) Note Last Updated on 01-SEP-06 1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
300 06 0292 / 5399
520 W ROOSEVELT RD
1.0
03/01/05
12/31/05
0 07/05/05
09/09/05
610
100
300 06 0300 / 5407
ABLA HOMES (CHA)
300 06 0289 / 5396
ROCKWELL GARDENS
281 00 / 33670
Totals per Lighting Imprvmnts
Work Type: Loop Lighting
3.0
1,420,298
1,003,345
Blocks
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Loop Lighting
.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 22
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 09 / 33068
ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE
2.0
01/28/09
02/02/09
2,700 01/28/09
02/02/09
2,000
100
300 09 / 33068
ON E 14TH PL FROM S STATE ST TO S WABASH AVE
1.0
01/28/09
02/02/09
1,350 01/28/09
02/02/09
1,000
100
300 09 / 33068
ON E 14TH ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
01/28/09
02/02/09
1,350 01/28/09
02/02/09
1,000
100
300 07 0002 / 5425
ON E 18TH ST FROM S PRAIRIE AVE TO S CALUMET AVE
1.0
11/01/06
12/01/06
225,951 11/02/06
05/07/07
0
100
300 09 / 33068
ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
08/25/08
09/05/08
1,350 07/18/08
09/02/08
1,350
100
300 09 / 33068
MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
08/25/08
09/05/08
1,350 08/20/08
09/02/08
1,350
100
300 09 / 33068
MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
10.88
11/24/08
12/05/08
14,688 11/24/08
12/05/08
12,462
100
300 09 / 33068
ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
13.76
12/15/08
12/31/08
18,576 12/01/08
12/09/08
15,760
100
300 09 / 33068
ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD
13.0
01/19/09
01/23/09
17,550 01/19/09
01/23/09
13,167
100
300 09 / 33068
ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST
4.0
07/28/08
08/14/08
5,400 07/28/08
08/14/08
4,580
100
300 09 / 33068
ON S CLINTON ST FROM W HARRISON ST TO W VAN BUREN ST
7.0
10/15/08
10/21/08
9,450 10/15/08
10/21/08
8,213
100
300 09 / 33068
ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST
11.0
03/28/08
04/04/08
22,000 03/28/08
04/04/08
12,452
100
300 09 / 33068
ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST
11.0
12/17/08
01/23/09
14,850 12/17/08
01/23/09
6,253
100
300 09 / 33068
ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST
8.0
03/28/08
04/04/08
16,000 03/28/08
04/04/08
9,160
100
300 09 / 33068
ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST
10.0
12/03/08
12/09/08
13,500 12/03/08
12/09/08
11,505
100
300 09 / 33068
ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD
11.0
01/12/09
01/30/09
14,850 01/14/09
01/22/09
21,786
100
300 09 / 33068
ON S WABASH AVE FROM E 23RD ST TO E 24TH PL
5.0
08/25/08
09/05/08
6,750 08/25/08
09/05/08
5,725
100
300 09 / 33068
ON S WABASH AVE FROM E 29TH ST TO E 30TH ST
5.0
08/25/08
09/05/08
6,750 07/10/08
07/15/08
5,725
100
300 09 / 33068
MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST
3.0
07/28/08
08/15/08
4,050 07/28/08
08/15/08
3,425
100
300 09 / 33068
ON S WESTERN AVE FROM W POLK ST TO W CONGRESS PKWY
24.0
01/05/09
02/02/09
32,400 01/05/09
02/02/09
21,167
100
300 09 / 33068
ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD
4.50
07/28/08
08/08/08
9,000 07/28/08
08/08/08
5,153
100
300 09 / 33068
ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE
13.0
12/18/08
01/08/09
17,550 12/18/08
01/08/09
12,593
100
300 09 / 33068
ON W FIFTH AVE FROM W MONROE ST TO S MOZART ST
12.0
01/08/09
02/20/09
16,200 01/08/09
02/20/09
15,919
100
300 09 / 33068
ON W HARRISON ST FROM S OAKLEY BLVD TO S MAPLEWOOD AVE
32.0
10/06/08
10/30/08
43,200 09/18/08
09/30/08
36,640
100
300 09 / 33068
ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST
7.0
08/25/08
08/29/08
9,450 08/25/08
08/29/08
8,015
100
300 09 / 33068
ON W POLK ST FROM S DEARBORN ST TO S CLARK ST
2.0
03/28/08
04/04/08
2,700 03/28/08
04/04/08
2,290
100
300 09 / 33068
ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE
2.0
10/20/08
10/24/08
2,700 10/09/08
10/16/08
2,864
100
300 09 / 33091
ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST
4.0
02/01/08
12/31/08
5,400 10/06/08
10/16/08
4,620
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 23
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 09 / 33068
ON W WILCOX ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE
6.0
07/30/08
08/15/08
8,100 07/30/08
08/15/08
6,870
100
300 09 / 33068
1400-1500 S LOOMIS ST
6.0
08/04/08
08/08/08
8,700 08/07/08
08/12/08
6,870
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting
232.14
553,865
259,913
Blocks
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Ornamental Lighting
Work Type: POD Camera Pole
.0
Poles
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
0
0
0
0
0
Totals per POD Camera Pole
Work Type: Residential Regrouping 300 06 0270 / 5378
429 S DEARBORN ST
Work Type: Residntl Staggered Lighting
.0
Lamps .0
03/01/08
12/01/08
Blocks
300 07 0002 / 5425
ON S CLAREMONT AVE FROM W FLOURNOY ST TO W POLK ST
1.0
04/18/06
11/18/06
65,000 11/21/06
04/13/07
43,295
100
300 07 0002 / 5425
ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST
1.0
04/18/06
11/18/06
80,000 09/01/06
10/27/06
51,733
100
300 09 / 33069
ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST
1.48
96,200 04/01/08
12/01/08
0
0
300 06 0298 / 5405
ON S PRAIRIE AVE FROM E 35TH ST TO E 37TH ST
2.0
0 10/06/05
12/20/05
148,781
100
300 05 0002 / 5117
ON S RICHMOND ST FROM W JACKSON BLVD TO W VAN BUREN ST
1.0
10/01/05
11/18/05
85,250 10/31/05
03/22/06
41,060
100
300 06 0308 / 5414
ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD
2.0
06/06/06
08/09/06
149,100 05/31/06
07/31/06
115,344
100
300 09 / 33068
Project has been completed as 07/31/2006 Note Last Updated on 25-AUG-06 ON W LEXINGTON ST FROM S CALIFORNIA AVE TO S WASHTENAW AVE
1.0
0
0
300 06 0308 / 5414
ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE
1.0
07/31/06
09/22/06
70,814 07/25/06
03/23/07
40,204
100
300 05 0002 / 5117
ON W MONROE ST FROM S DAMEN AVE TO S LEAVITT ST
2.0
10/01/05
11/18/05
170,000 11/18/05
03/22/06
134,342
100
300 07 0002 / 5425
ON W WILCOX ST FROM S CALIFORNIA AVE TO S SACRAMENTO BLVD
2.0
04/18/06
11/18/06
150,000 09/01/06
10/27/06
103,465
100
Totals per Residntl Staggered Lighting
14.48
18,000
884,364
678,224
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 24
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 03 0002 / 4873
ON S GILES AVE FROM E 31ST ST TO E 35TH ST
1.76
09/15/04
11/15/04
281,600 09/09/04
12/31/04
162,916
100
300 06 0235 / 5349
ON W ADAMS ST FROM S WESTERN AVE TO S LEAVITT ST
2.0
09/15/03
12/15/03
167,970 09/05/03
11/04/03
137,598
100
300 06 0267 / 5375
ON W MONROE ST FROM S WESTERN AVE TO S LEAVITT ST
2.0
10/01/04
12/30/04
147,450 10/09/04
12/10/04
121,950
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial
5.76
597,020
422,464
Locations
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Short Arm Installs - Arterial
Work Type: Short Arm Installs - Residntl 281 00 / 33670
W POLK ST AND S STATE ST
302 00 0092 / 5774
2332 W FLOURNOY ST
281 00 / 33670
1611 W HARRISON ST
Totals per Short Arm Installs - Residntl
.0
Locations .0
01/01/08
12/31/08
2.0 .0 2.0
0
0
0
756
100
0
0
0
0
756
0 06/14/01 01/01/08
12/31/08
06/14/01
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 25
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 09 / 33068
ON E 13TH ST FROM S STATE ST TO S MICHIGAN AVE
3.0
09/17/08
09/19/08
900 09/17/08
09/19/08
630
100
300 09 / 33068
ON E 18TH ST FROM S INDIANA AVE TO S PRAIRIE AVE
3.0
05/27/08
06/13/08
900 07/09/08
07/10/08
630
100
300 06 0081 / 5244
ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE
5.92
0 05/23/98
05/23/98
376
100
300 09 / 33068
ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
06/09/08
06/13/08
300 07/18/08
09/02/08
630
100
300 09 / 33068
ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE
1.0
08/18/08
08/20/08
300 08/18/08
08/20/08
210
100
300 09 / 33068
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
7.48
05/28/08
06/20/08
1,870 06/06/07
06/10/08
1,571
100
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
8.60
05/28/08
06/20/08
2,150 06/13/07
06/24/08
1,806
100
302 00 0077 / 5765
ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR
0 08/25/99
08/31/99
1,529
100
300 09 / 33068
ON E CULLERTON ST FROM S INDIANA AVE TO S CALUMET AVE
2,700 07/15/08
07/22/08
1,890
100
300 06 0081 / 5244
ON E JACKSON BLVD FROM S STATE ST TO S MICHIGAN AVE
27.0
0 05/02/98
05/03/98
1,715
100
300 06 0081 / 5244
ON E VAN BUREN ST FROM S STATE ST TO S MICHIGAN AVE
27.0
0 05/02/98
05/03/98
1,715
100
300 11 / 32191
ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST
300 11 / 32191
ON N FRANCISCO AVE FROM W MADISON ST TO W LAKE ST
300 11 / 32191
17.50 9.0
05/29/08
06/20/08
13.43
11/14/08
12/15/08
3,358 11/14/08
12/15/08
2,686
100
3.0
11/14/08
12/15/08
600 11/14/08
12/15/08
600
100
ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD
18.0
11/14/08
12/15/08
4,500 11/14/08
12/15/08
3,600
100
300 09 / 33068
ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST
22.0
06/02/08
06/13/08
4,400 06/02/08
06/13/08
4,620
100
300 11 / 32191
ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST
34.40
11/14/08
12/16/08
8,600 11/14/08
12/16/08
6,880
100
300 09 / 33068
ON S CALUMET AVE FROM E 18TH ST TO E 21ST ST
9.0
05/29/08
06/20/08
2,700 05/29/08
06/20/08
1,890
100
300 09 / 33068
ON S CALUMET AVE FROM E 18TH ST TO E CERMAK RD
3.0
08/21/08
08/29/08
900 08/21/08
08/29/08
630
100
300 09 / 33068
ON S CLAREMONT AVE FROM W CONGRESS PKWY TO W HARRISON ST
4.0
06/02/08
06/13/08
1,200 06/02/08
06/13/08
840
100
300 06 0081 / 5244
ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST
0 05/17/98
05/23/98
2,350
100
300 09 / 33068
ON S CLINTON ST FROM W VAN BUREN ST TO W HARRISON ST
300 09 / 33068
ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE
300 09 / 33068
ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST
300 09 / 33068
37.0 7.0
10/13/08
10/17/08
2,100 10/13/08
10/17/08
1,470
100
17.20
06/02/08
06/20/08
3,440 06/02/08
06/13/08
3,612
100
19.0
07/16/08
07/31/08
3,800 07/16/08
07/31/08
3,990
100
ON S DENVIR AVE FROM W CONGRESS PKWY TO W HARRISON ST
4.0
06/02/08
06/30/08
1,200 06/02/08
06/26/08
840
100
300 09 / 33068
ON S DESPLAINES ST FROM W MONROE ST TO W VAN BUREN ST
11.0
09/09/08
09/24/08
3,300 09/09/08
09/24/08
2,310
100
300 11 / 32191
ON S FRANCISCO AVE FROM W MADISON ST TO W MONROE ST
2.0
11/14/08
12/16/08
500 11/14/08
12/16/08
400
100
300 09 / 33068
ON S HAMILTON AVE FROM W ADAMS ST TO W JACKSON BLVD
2.0
04/01/08
04/21/08
400 04/01/08
04/21/08
420
100
300 09 / 33068
ON S HOYNE AVE FROM W ADAMS ST TO W GLADYS AVE
4.0
04/01/08
04/21/08
800 04/01/08
04/21/08
840
100
300 09 / 33068
ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST
7.38
05/29/08
06/20/08
1,845 05/29/08
06/20/08
1,550
100
300 06 0225 / 5340
ON S INDIANA AVE FROM E CERMAK RD TO E ROOSEVELT RD
94.0
09/01/03
09/07/03
40,030 08/28/03
09/05/03
28,910
100
300 09 / 33068
ON S JEFFERSON ST FROM W ROOSEVELT RD TO W GRENSHAW ST
10.0
11/24/08
11/25/08
3,000 11/24/08
11/25/08
2,100
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 26
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0081 / 5244
ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST
300 09 / 33068
ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST
300 09 / 33068
Locations 23.50
0 05/13/98
05/16/98
1,493
100
4.41
06/02/08
06/13/08
1,323 06/02/08
06/13/08
926
100
ON S LEAVITT ST FROM W ADAMS ST TO W JACKSON BLVD
3.0
06/02/08
06/20/08
900 06/02/08
06/20/08
630
100
300 09 / 33068
ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST
4.0
06/02/08
06/20/08
800 06/02/08
06/20/08
840
100
300 09 / 33068
ON S LEAVITT ST FROM W MADISON ST TO W MONROE ST
5.0
04/01/08
04/23/08
1,000 04/01/08
04/23/08
1,050
100
300 09 / 33068
ON S LEAVITT ST FROM W VAN BUREN ST TO W CONGRESS PKWY
6.0
10/29/08
11/06/08
1,800 10/29/08
11/06/08
1,260
100
300 09 / 33068
ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST
16.0
06/02/08
06/20/08
4,800 06/02/08
06/20/08
3,360
100
300 09 / 33068
ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD
11.0
01/05/09
01/09/09
3,300 01/05/09
01/09/09
2,310
100
300 09 / 33068
ON S MAPLEWOOD AVE FROM W CONGRESS PKWY TO W HARRISON ST
4.0
04/01/08
04/22/08
1,200 04/01/08
04/22/08
840
100
300 09 / 33068
ON S MORGAN ST FROM W CONGRESS PKWY TO W VAN BUREN ST
2.0
11/12/08
11/17/08
600 11/12/08
11/17/08
420
100
300 09 / 33068
ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST
4.0
06/02/08
06/20/08
1,200 06/02/08
06/20/08
840
100
300 11 / 32191
ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST
10.44
11/14/08
12/16/08
2,610 11/14/08
12/16/08
2,088
100
300 09 / 33068
ON S PAULINA ST FROM W VAN BUREN ST TO W CONGRESS PKWY
4.0
09/16/08
09/19/08
1,200 09/16/08
09/19/08
840
100
300 06 0108 / 5263
ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST
6.0
08/10/04
08/11/04
1,500 07/23/04
07/28/04
1,476
100
300 11 / 32191
ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST
17.20
11/14/08
12/16/08
4,300 11/14/08
12/16/08
3,440
100
300 06 0081 / 5244
ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY
4.0
0 05/23/98
05/23/98
254
100
300 09 / 33068
ON S WABASH AVE FROM E 23RD ST TO E 24TH PL
5.0
06/09/08
06/13/08
1,500 06/09/08
06/13/08
1,050
100
300 09 / 33068
ON S WABASH AVE FROM E 29TH ST TO E 30TH ST
5.0
06/09/08
06/13/08
1,500 06/09/08
06/13/08
1,050
100
300 06 0081 / 5244
ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE
74.10
0 05/08/98
05/17/98
4,769
100
300 06 0081 / 5244
ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY
3.20
0 05/23/98
05/23/98
203
100
300 09 / 33068
ON S WASHTENAW AVE FROM W WILCOX ST TO W MONROE ST
300 09 / 33068
ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST
300 09 / 33068
3.0
06/09/08
06/13/08
900 06/03/08
06/13/08
630
100
68.40
06/02/08
06/20/08
13,680 06/05/08
07/09/08
14,364
100
ON W ADAMS ST FROM S LEAVITT ST TO S DAMEN AVE
15.0
06/02/08
06/13/08
4,500 06/02/08
06/13/08
3,150
100
300 09 / 33068
ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE
13.0
10/07/08
10/22/08
3,900 10/07/08
10/22/08
2,730
100
300 09 / 33068
ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD
18.24
06/02/08
06/20/08
5,472 06/02/08
06/26/08
3,830
100
300 06 0081 / 5244
ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST
0 04/25/98
05/03/98
3,175
100
300 09 / 33068
ON W ADAMS ST FROM S WESTERN AVE TO S CAMPBELL AVE
300 09 / 33068
50.0 6.0
04/01/08
04/25/08
1,800 04/01/08
04/25/08
1,260
100
9.75
10/07/08
10/22/08
2,925 10/07/08
10/22/08
2,048
100
300 09 / 33068
ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD AVE ON W CONGRESS PKWY FROM S MAPLEWOOD AVE TO S LEAVITT ST
20.0
04/01/08
04/21/08
6,000 04/01/08
04/21/08
4,200
100
300 11 / 32191
ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST
19.0
11/14/08
12/15/08
4,750 11/14/08
12/15/08
3,800
100
300 09 / 33068
ON W GLADYS AVE FROM S WASHTENAW AVE TO S CALIFORNIA AVE
7.0
11/17/08
12/01/08
1,400 11/17/08
12/01/08
1,470
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 27
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 07 0002 / 5425
ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD
300 09 / 33068
ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD
22.0
04/18/06
11/18/06
5,500 10/20/06
10/21/06
0
100
31.20
08/13/08
09/09/08
9,360 08/13/08
09/09/08
6,552
300 11 / 32191
100
ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST
17.0
11/14/08
12/15/08
3,400 11/14/08
12/15/08
3,400
100
300 09 / 33068
ON W JACKSON BLVD FROM S DAMEN AVE TO S LEAVITT ST
13.0
11/06/08
12/01/08
3,900 11/06/08
12/01/08
2,730
100
300 09 / 33068
ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE
15.0
06/02/08
06/20/08
4,500 06/02/08
06/20/08
3,150
100
300 11 / 32191
ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE
29.64
11/14/08
12/15/08
7,410 11/14/08
12/15/08
5,928
100
300 06 0081 / 5244
ON W JACKSON BLVD FROM S STATE ST TO S JEFFERSON ST
107.0
0 04/25/98
05/03/98
6,795
100
300 09 / 33068
ON W LAKE ST FROM N SACRAMENTO BLVD TO N ALBANY AVE
300 09 / 33068
ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD
300 06 0081 / 5244
ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST
300 07 0042 / 5465
ON W MADISON ST FROM WACKER DR TO CANAL ST
300 09 / 33068
ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE
300 09 / 33068
ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST
300 06 0081 / 5244
ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST
300 09 / 33068
ON W OGDEN AVE FROM W VAN BUREN ST TO W CONGRESS PKWY
300 11 / 32191
6.0
10/09/08
10/17/08
1,800 10/09/08
10/17/08
1,260
100
73.0
02/01/08
04/11/08
21,900 02/01/08
04/11/08
15,330
100
0 05/04/98
05/10/98
2,826
100
44.50 2.0
04/18/06
11/18/06
500 08/14/06
09/01/06
395
100
20.0
06/02/08
06/20/08
6,000 06/02/08
06/20/08
4,200
100
7.0
07/01/08
07/07/08
2,100 07/01/08
07/10/08
1,470
100
0 05/04/98
05/10/98
2,858
100
45.0 4.0
09/17/08
09/23/08
1,200 09/17/08
09/23/08
840
100
ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE
31.92
11/14/08
12/16/08
7,980 11/14/08
12/16/08
6,384
100
300 06 0081 / 5244
ON W VAN BUREN ST FROM S STATE ST TO S JEFFERSON ST
106.0
0 04/25/98
05/03/98
6,731
100
300 09 / 33068
ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE
20.0
06/02/08
06/20/08
6,000 06/18/08
06/30/08
4,200
100
300 11 / 32191
ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE
47.0
11/14/08
12/15/08
11,750 11/14/08
12/15/08
9,400
100
300 11 / 32191
ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE
51.0
11/14/08
12/16/08
12,750 11/14/08
12/16/08
10,200
100
300 09 / 33068
ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE
22.0
06/02/08
06/20/08
6,600 06/24/08
07/01/08
4,620
100
300 09 / 33068
ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
12.0
06/02/08
06/20/08
3,600 06/26/08
07/07/08
2,520
100
300 09 / 33068
1400-1500 S LOOMIS ST
6.0
06/25/07
06/27/08
1,800 06/25/08
06/27/08
1,260
100
300 06 0081 / 5244
500 S STATE ST
4.0
0 05/23/98
05/23/98
254
100
300 06 0191 / 5316
300-400 W ROOSEVELT RD
21,000 10/30/00
11/15/00
21,000
100
Totals per Strt Light Pole Painting
60.0 1,669.41
11/01/00
11/20/00
309,703
277,337
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 28
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc
Blocks
281 00 / 33670
W POLK ST AND S STATE ST
.0
01/01/08
12/31/08
0
0
281 00 / 33670
1611 W HARRISON ST
.0
01/01/08
12/31/08
0
0
0
300 06 0191 / 5316
300-400 W ROOSEVELT RD
1.0
01/01/01
05/01/01
0
100
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Strt Lighting
1.0
142,200 01/10/01 142,200
0
Blocks
300 06 0074 / 5237
500-12000 S HOLDEN CT
03/01/98
04/15/00
145,000 03/03/98
300 06 0233 / 5347
11 S WACKER DR
12/31/02
12/31/04
220,000 10/22/02
Totals per Strt Lighting
03/19/01
0
365,000
03/30/00
137,485
100
26,157
40
163,642
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 29
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0251 / 5361
ON S CLINTON ST FROM W HARRISON ST TO W POLK ST
8.0
08/15/05
08/20/05
7,892 08/11/05
09/19/05
6,808
100
300 06 0251 / 5361
ON S JEFFERSON ST FROM W HARRISON ST TO W POLK ST
8.0
08/15/05
08/20/05
7,892 08/11/05
09/19/05
6,808
100
300 06 0251 / 5361
ON W HARRISON ST FROM S CLINTON ST TO S JEFFERSON ST
8.0
08/15/05
08/20/05
7,892 08/01/05
09/14/05
6,796
100
300 06 0251 / 5361
ON W POLK ST FROM S CLINTON ST TO S JEFFERSON ST
8.0
08/15/05
08/20/05
7,892 08/01/05
09/14/05
6,796
100
805 06 2741 / 8927
1015 N MICHIGAN AVE
52.0
01/01/93
01/01/93
0 01/01/93
01/01/93
39,000
100
805 06 2708 / 8894
1501 S ASHLAND AVE
22.0
06/05/94
06/05/94
0 06/05/94
06/05/94
16,500
100
805 06 2706 / 8892
1595 S ASHLAND AVE
30.0
06/06/94
06/06/94
0 06/06/94
06/06/94
22,500
100
302 00 0070 / 5758
1520 S BLUE ISLAND AVE
0 05/14/97
05/21/97
14,742
100
302 00 0070 / 5758
1550 S BLUE ISLAND AVE
0 05/14/97
05/21/97
24,170
100
805 06 2312 / 8498
498 S CANAL ST
13.0
05/18/94
05/18/94
0 05/18/94
05/18/94
9,750
100
805 06 2695 / 8881
1515 S CANAL ST
6.0
04/21/94
04/21/94
0 04/21/94
04/21/94
4,500
100
805 06 2694 / 8880
1595 S CANAL ST
6.0
04/22/94
04/22/94
0 04/22/94
04/22/94
4,500
100
805 06 2839 / 9025
1598 S CLARK ST
3.0
12/09/93
12/09/93
0 12/09/93
12/09/93
2,250
100
302 00 0070 / 5758
1500 S DAMEN AVE
0 10/05/97
10/20/97
22,318
100
805 06 2139 / 8325
1500 S DAMEN AVE
0 10/20/97
10/20/97
36,750
100
302 00 0070 / 5758
510 S DESPLAINES ST
0 07/08/97
07/15/97
13,318
100
805 06 2140 / 8326
510 S DESPLAINES ST
21.0
07/15/97
07/15/97
0 07/15/97
07/15/97
15,750
100
805 06 2596 / 8782
2430 S DR MARTIN LUTHER KING JR DR
30.0
06/25/95
06/25/95
0 06/25/95
06/25/95
22,500
100
805 06 2597 / 8783
2490 S DR MARTIN LUTHER KING JR DR
30.0
06/25/95
06/25/95
0 06/25/95
06/25/95
22,500
100
805 06 2593 / 8779
599 S FRANKLIN ST
12.0
02/24/94
02/24/94
0 02/24/94
02/24/94
9,000
100
805 06 2598 / 8784
1595 S INDIANA AVE
8.0
05/03/93
05/03/93
0 05/03/93
05/03/93
6,000
100
302 00 0070 / 5758
500 S JEFFERSON ST
0 07/24/97
07/31/97
16,090
100
805 06 2118 / 8304
500 S JEFFERSON ST
16.0
07/31/97
07/31/97
0 07/31/97
07/31/97
12,000
100
805 06 2890 / 9076
1501 S LAFLIN ST
14.0
02/11/94
02/11/94
0 02/11/94
02/11/94
10,500
100
805 06 2856 / 9042
1595 S LAFLIN ST
40.0
02/11/94
02/11/94
0 02/11/94
02/11/94
30,000
100
302 00 0071 / 5759
2300 S LAKE SHORE DR
0 06/05/98
06/19/98
23,274
100
805 06 2664 / 8850
2300 S LAKE SHORE DR
25.0
12/14/94
12/14/94
0 12/14/94
12/14/94
18,750
100
805 06 2665 / 8851
2300 S LAKE SHORE DR
25.0
12/31/94
12/31/94
0 12/31/94
12/31/94
18,750
100
805 06 2689 / 8875
2300 S LAKE SHORE DR
25.0
12/14/94
12/14/94
0 12/14/94
12/14/94
18,750
100
805 06 2901 / 9087
1501 S LOOMIS ST
20.0
12/07/93
12/07/93
0 12/07/93
12/07/93
15,000
100
805 06 2886 / 9072
1595 S LOOMIS ST
30.0
12/19/93
12/19/93
0 12/19/93
12/19/93
22,500
100
49.0
10/20/97
10/20/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 30
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2614 / 8800
1595 S MICHIGAN AVE
14.0
12/11/93
12/11/93
0 12/11/93
12/11/93
10,500
100
805 06 2583 / 8769
1505 S PAULINA ST
22.0
06/09/95
06/09/95
0 06/09/95
06/09/95
16,500
100
805 06 2582 / 8768
1595 S PAULINA ST
26.0
06/09/95
06/09/95
0 06/09/95
06/09/95
19,500
100
302 00 0070 / 5758
1530 S THROOP ST
0 05/20/97
06/03/97
13,193
100
805 06 2160 / 8346
1530 S THROOP ST
14.0
01/01/91
01/01/91
0 01/01/91
01/01/91
10,500
100
805 06 2161 / 8347
1530 S THROOP ST
18.0
06/03/97
06/03/97
0 06/03/97
06/03/97
13,500
100
805 06 2525 / 8711
1501 S WOOD ST
22.0
06/29/95
06/29/95
0 06/29/95
06/29/95
16,500
100
805 06 2707 / 8893
1598 W 16TH ST
6.0
05/24/94
05/24/94
0 05/24/94
05/24/94
4,500
100
805 06 2226 / 8412
130 W CONGRESS PKWY
64.0
12/09/96
12/09/96
0 12/09/96
12/09/96
48,000
100
805 06 2882 / 9068
930 W HARRISON ST
11.0
09/25/93
09/25/93
0 09/25/93
09/25/93
8,250
100
805 06 2933 / 9119
2545 W JACKSON BLVD
8.0
03/01/94
03/01/94
0 03/01/94
03/01/94
6,000
100
805 06 2936 / 9122
2600 W MADISON ST
8.0
03/02/94
03/02/94
0 03/02/94
03/02/94
6,000
100
805 06 2939 / 9125
2631 W MAYPOLE AVE
8.0
03/08/94
03/08/94
0 03/08/94
03/08/94
6,000
100
805 06 2776 / 8962
2545 W MONROE ST
6.0
12/23/94
12/23/94
0 12/23/94
12/23/94
4,500
100
805 06 2677 / 8863
101 W POLK ST
12.0
09/18/92
09/18/92
0 09/18/92
09/18/92
9,000
100
805 06 2775 / 8961
2579 W VAN BUREN ST
6.0
04/06/94
04/06/94
0 04/06/94
04/06/94
4,500
100
302 00 0070 / 5758
2600 W WARREN BLVD
0 09/08/97
09/15/97
7,403
100
805 06 2125 / 8311
2600 W WARREN BLVD
8.0
09/15/97
09/15/97
0 09/15/97
09/15/97
6,000
100
805 06 2209 / 8395
2631 W WARREN BLVD
6.0
12/31/95
12/31/95
0 12/31/95
12/31/95
4,500
100
302 00 0070 / 5758
2600 W WASHINGTON BLVD
0 11/20/97
12/02/97
14,078
100
805 06 2126 / 8312
2600 W WASHINGTON BLVD
8.0
12/02/97
12/02/97
0 12/02/97
12/02/97
6,000
100
805 06 2208 / 8394
2631 W WASHINGTON BLVD
6.0
12/31/95
12/31/95
0 12/31/95
12/31/95
4,500
100
Totals per Underpass Lighting
782.0
31,568
738,294
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 31
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
ON W ROOSEVELT RD FROM S RUBLE ST TO S DESPLAINES ST
1.0
0 04/29/02
04/29/02
9,181
100
210 06 0219 / 4459
N WESTERN AVE AND W LAKE ST
.50
03/24/05
03/25/05
5,282 03/01/05
03/01/05
4,365
100
210 06 0219 / 4459
N WESTERN AVE AND W WARREN BLVD
1.0
03/22/05
03/23/05
10,563 03/14/05
03/14/05
6,925
100
210 06 0219 / 4459
N WESTERN AVE AND W WASHINGTON BLVD
1.0
03/23/05
03/24/05
10,563 03/15/05
03/15/05
6,925
100
210 06 0130 / 4389
S CANAL ST AND W ROOSEVELT RD
1.0
0 04/23/02
04/23/02
6,410
100
210 06 0130 / 4389
S CLARK ST AND W JACKSON BLVD
.50
0 10/09/01
10/09/01
3,257
100
210 06 0219 / 4459
S CLARK ST AND W VAN BUREN ST
1.0
10,563 04/14/05
04/15/05
6,925
100
210 06 0130 / 4389
S COLUMBUS DR AND E BALBO AVE
.50
0 02/06/02
02/06/02
6,231
100
210 06 0130 / 4389
S COLUMBUS DR AND E CONGRESS DR
.50
0 03/06/02
03/06/02
4,728
100
210 06 0130 / 4389
S COLUMBUS DR AND E JACKSON BLVD
.50
0 01/17/02
01/17/02
4,856
100
210 06 0130 / 4389
S COLUMBUS DR AND E ROOSEVELT RD
1.0
0 02/20/02
02/20/02
11,457
100
210 06 0130 / 4389
S DEARBORN ST AND W JACKSON BLVD
.50
0 10/09/01
10/09/01
3,257
100
210 06 0219 / 4459
S DEARBORN ST AND W VAN BUREN ST
1.0
10,563 04/17/05
04/17/05
6,925
100
210 06 0130 / 4389
S FRANKLIN ST AND W ADAMS ST
1.0
0 10/02/01
10/02/01
6,108
100
210 06 0130 / 4389
S FRANKLIN ST AND W JACKSON BLVD
1.0
0 10/08/01
10/08/01
6,513
100
210 06 0130 / 4389
S FRANKLIN ST AND W MONROE ST
1.0
0 09/25/01
09/25/01
6,918
100
210 06 0130 / 4389
S FRANKLIN ST AND W VAN BUREN ST
1.0
0 10/23/01
10/23/01
6,513
100
210 06 0219 / 4459
S FRANKLIN ST AND W VAN BUREN ST
1.0
10,563 04/18/05
04/18/05
6,203
100
210 06 0130 / 4389
S INDIANA AVE AND E ROOSEVELT RD
1.0
0 02/26/02
02/26/02
7,729
100
210 06 0130 / 4389
S JEFFERSON ST AND W ROOSEVELT RD
1.0
0 04/26/02
04/26/02
8,539
100
210 06 0130 / 4389
S MICHIGAN AVE AND E 14TH ST
1.0
0 11/29/01
11/29/01
12,035
100
210 06 0130 / 4389
S MICHIGAN AVE AND E JACKSON BLVD
.50
0 11/04/02
11/04/02
5,132
100
210 06 0130 / 4389
S MICHIGAN AVE AND E VAN BUREN ST
1.0
0 11/04/02
11/04/02
8,518
100
210 06 0120 / 4379
S MORGAN ST AND W MONROE ST
1.0
12,700 03/21/01
03/26/01
672
100
210 06 0130 / 4389
S PAULINA ST AND W ROOSEVELT RD
1.0
0 01/09/02
01/09/02
6,410
100
210 06 0130 / 4389
S WABASH AVE AND E JACKSON BLVD
.50
0 10/09/01
10/09/01
2,395
100
210 06 0130 / 4389
S WABASH AVE AND E VAN BUREN ST
1.0
0 10/25/01
10/25/01
7,272
100
210 06 0130 / 4389
S WELLS ST AND W ADAMS ST
.50
0 10/04/01
10/04/01
3,459
100
210 06 0175 / 4423
S WELLS ST AND W CONGRESS PKWY
1.0
16,000 04/14/03
04/17/03
13,664
100
210 06 0130 / 4389
S WELLS ST AND W JACKSON BLVD
.50
0 10/10/01
10/10/01
2,940
100
210 06 0130 / 4389
S WELLS ST AND W MONROE ST
.50
0 10/04/01
10/04/01
3,662
100
04/19/05
04/22/05
04/23/05
04/01/01
04/14/03
04/19/05
04/22/05
04/23/05
06/01/01
04/17/03
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 32
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S WELLS ST AND W VAN BUREN ST
1.0
04/20/05
04/20/05
10,563 04/15/05
04/15/05
6,203
100
210 06 0219 / 4459
S WESTERN AVE AND W CONGRESS PKWY
1.0
03/18/05
03/19/05
10,563 03/21/05
03/21/05
6,800
100
210 06 0219 / 4459
S WESTERN AVE AND W HARRISON ST
1.0
03/17/05
03/18/05
10,563 03/22/05
03/22/05
8,008
100
210 06 0219 / 4459
S WESTERN AVE AND W JACKSON BLVD
1.0
03/20/05
03/21/05
10,563 03/23/05
03/23/05
8,007
100
210 06 0219 / 4459
S WESTERN AVE AND W VAN BUREN ST
1.0
03/19/05
03/20/05
10,563 03/30/05
03/30/05
6,800
100
210 06 0130 / 4389
S WOOD ST AND W ROOSEVELT RD
1.0
0 01/09/02
01/09/02
8,539
100
210 06 0175 / 4423
W VAN BUREN ST AND S CLARK ST
1.0
17,000 06/06/03
06/11/03
16,020
100
210 06 0130 / 4389
840 S CANAL ST
1.0
0 09/28/01
09/28/01
4,738
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0209 / 4452
S CANAL ST AND W ROOSEVELT RD
210 06 0231 / 4470
S RACINE AVE AND W ROOSEVELT RD
300 07 0002 / 5425 300 06 0078 / 5241
06/06/03
06/11/03
33.50
156,612
261,235
Locations 1.0
09/20/04
10/08/04
88,687
100
.0
03/01/08
12/01/08
109,720
0
0
W HARRISON ST AND S STATE ST
1.0
04/18/06
11/18/06
40,000
0
0
1600 W FLOURNOY ST
1.0
04/01/98
12/01/98
5,981
100
Totals per Left Turn Arrow
Work Type: New Signal
3.0
97,100 09/14/04
6,500 08/13/99
09/28/04
08/17/99
253,320
94,668
Locations
300 06 0283 / 5391
ON S ASHLAND AVE FROM W OGDEN AVE TO W MADISON ST
1.0
09/01/04
09/30/04
11,150 09/09/04
09/09/04
11,150
100
300 11 / 32191
E 13TH ST AND S MICHIGAN AVE
1.0
06/03/08
06/30/08
165,000 06/03/08
06/30/08
165,000
100
210 06 0073 / 4337
1500 S CLARK ST
1.0
05/15/01
12/01/01
175,000 05/16/01
07/23/01
84,034
100
3.0
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477
E VAN BUREN ST AND S MICHIGAN AVE
210 06 / 32280
S CANAL ST AND W JACKSON BLVD
210 06 0240 / 4477
S CLARK ST AND W CONGRESS PKWY
210 06 0207 / 4450
S MICHIGAN AVE AND E JACKSON BLVD
210 06 / 32280
W ADAMS ST AND S CANAL ST
Totals per Pedestrian Countdown Signal Install
351,150
260,184
Locations 6.0
05/01/06
09/30/06
.0
05/04/08
12/31/08
12.0
05/01/06
06/01/06
.50
12/01/04
12/15/04
.0
05/04/08
12/31/08
18.50
9,500 03/28/06
03/28/06
11,682
5,688
100
0
0
5,632 03/28/06
03/28/06
6,446
100
5,179 12/01/04
12/08/04
5,255
100
11,356
0
0
43,349
17,389
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 33
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals
Crossings
300 06 0197 / 5322
N CALIFORNIA AVE AND W LAKE ST
.50
2,000 07/18/01
04/08/02
1,285
100
300 06 0197 / 5322
N SACRAMENTO AVE AND W LAKE ST
2.0
8,000 07/18/01
07/19/01
1,780
100
300 06 0197 / 5322
S DAMEN AVE AND W 14TH ST
2.0
8,000 08/09/01
08/09/01
0
100
300 06 0197 / 5322
S RACINE AVE AND W CONGRESS PKWY
2.0
8,000 10/12/01
04/08/02
693
100
300 06 0197 / 5322
S SACRAMENTO AVE AND W FIFTH AVE
.50
2,000 07/18/01
07/19/01
1,948
100
300 06 0197 / 5322
S WABASH AVE AND E 24TH ST
1.0
4,000 04/18/01
04/19/01
2,445
100
300 06 0197 / 5322
W 14TH ST AND S BLUE ISLAND AVE
.50
2,000 09/11/01
09/12/01
1,328
100
300 06 0197 / 5322
W ROOSEVELT RD AND S LOOMIS ST
1.0
12,000 07/02/01
08/01/01
18,249
100
300 06 0197 / 5322
1758 W JACKSON BLVD
1.0
8,000 11/19/01
11/19/01
13,649
100
Totals per Removal Temp Wiring - Signals
Work Type: Signal Realignment 300 06 0199 / 5324 Totals per Traffic
W JACKSON BLVD AND S CANAL ST
04/18/01
04/19/01
10.50
54,000
41,376
Intersections 1.0
08/30/01
08/30/01
2,090 08/22/01 1,541,740
08/22/01
2,013 3,928,167
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 34
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install 210 06 0232 / 4471
ON W 14TH ST FROM S BLUE ISLAND AVE TO S RACINE AVE
210 06 0020 / 4295
S BLUE ISLAND AVE AND W 16TH ST
210 06 0021 / 4296
W WASHINGTON ST AND N HOYNE AVE
814 06 0351 / 16549
Locations 04/15/05
11/15/05
338,000 04/07/05
01/11/06
303,511
100
05/18/00
07/15/00
82,500 05/18/00
09/25/00
95,886
100
1.0
05/01/01
08/01/01
132,000 04/03/01
07/05/01
136,385
100
200 N CALIFORNIA AVE
1.0
09/26/96
09/26/96
0 09/26/96
09/26/96
117,950
100
814 06 0276 / 16488
844 N CLARK ST
1.0
05/22/89
05/22/89
0 05/22/89
05/22/89
59,113
100
814 06 0380 / 16570
100 N WESTERN AVE
1.0
04/25/97
04/25/97
0 04/25/97
09/22/97
200,000
100
814 06 0369 / 16559
700 S ASHLAND AVE
1.0
10/13/95
10/13/95
0 10/13/95
10/13/95
160,943
100
300 06 0117 / 5271
1200 S CLINTON ST
1.0
30,000 02/19/99
09/23/99
40,562
100
814 06 0308 / 16520
400 S DAMEN AVE
1.0
05/17/89
05/17/89
0 05/17/89
05/17/89
87,789
100
814 06 0337 / 16536
500 S DAMEN AVE
1.0
05/16/89
05/16/89
0 05/16/89
05/16/89
87,789
100
814 06 0309 / 16521
999 S DESPLAINES ST
1.0
07/26/90
07/26/90
0 07/26/90
07/26/90
95,000
100
814 06 0184 / 16396
2400 S DR MARTIN LUTHER KING JR DR
1.0
03/02/94
03/02/94
0 03/02/94
03/02/94
120,000
100
814 06 0183 / 16395
2500 S DR MARTIN LUTHER KING JR DR
1.0
02/24/94
02/24/94
0 02/24/94
02/24/94
120,000
100
814 06 0093 / 16309
2559 S DR MARTIN LUTHER KING JR DR
1.0
01/28/94
01/28/94
0 01/28/94
01/28/94
98,691
100
814 06 0091 / 16307
3100 S DR MARTIN LUTHER KING JR DR
1.0
02/07/94
02/07/94
0 02/07/94
02/07/94
98,691
100
814 06 0213 / 16425
2199 S INDIANA AVE
1.0
11/03/94
11/03/94
0 11/03/94
11/03/94
120,000
100
814 06 0211 / 16423
2400 S INDIANA AVE
1.0
10/25/94
10/25/94
0 10/25/94
10/25/94
120,000
100
814 06 0190 / 16402
200 S JEFFERSON ST
1.0
01/31/92
01/31/92
0 01/31/92
01/31/92
88,990
100
814 06 0212 / 16424
2200 S MICHIGAN AVE
1.0
10/28/94
10/28/94
0 10/28/94
10/28/94
120,000
100
814 06 0215 / 16427
2400 S MICHIGAN AVE
1.0
10/25/94
10/25/94
0 10/25/94
10/25/94
120,000
100
814 06 0386 / 16574
400 S MORGAN ST
1.0
10/31/95
10/31/95
0 10/31/95
10/31/95
104,565
100
814 06 0079 / 16295
1400 S STATE ST
1.0
04/07/96
04/07/96
0 04/07/96
04/07/96
118,870
100
814 06 0257 / 16469
400 S WESTERN AVE
1.0
08/16/89
08/16/89
0 08/16/89
08/16/89
74,970
100
814 06 0255 / 16467
500 S WESTERN AVE
1.0
08/18/89
08/18/89
0 08/18/89
08/18/89
74,970
100
814 06 0253 / 16465
800 S WESTERN AVE
1.0
09/22/89
09/22/89
0 09/22/89
09/22/89
74,970
100
814 06 0345 / 16543
405 W JACKSON BLVD
1.0
04/23/97
05/09/97
0 04/23/97
05/09/97
73,473
100
814 06 0186 / 16398
421 W JACKSON BLVD
1.0
04/23/97
04/23/97
0 04/23/97
05/09/97
200,000
100
814 06 0055 / 16272
713 W TAYLOR ST
1.0
09/29/89
09/29/89
0 09/29/89
09/29/89
90,000
100
Totals per TSM Install
2.0
28.0
582,500
3,203,118
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 35
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 09 / 33068
ON E 23RD ST FROM S WABASH AVE TO S MICHIGAN AVE
2.0
06/09/08
06/13/08
400 07/18/08
09/02/08
338
100
300 09 / 33068
ON E 24TH ST FROM S WABASH AVE TO S MICHIGAN AVE
2.0
06/09/08
06/13/08
400 08/18/08
08/20/08
300
100
300 09 / 33068
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
.68
05/28/08
06/20/08
136 04/01/08
12/01/08
85
100
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
.86
05/28/08
06/20/08
172 04/01/08
12/01/08
73
100
300 11 / 32191
ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST
11.06
11/14/08
12/15/08
3,784 11/14/08
12/15/08
3,561
100
300 11 / 32191
ON N SACRAMENTO BLVD FROM W WALNUT ST TO W WARREN BLVD
13.0
11/14/08
12/15/08
4,655 11/14/08
12/15/08
4,186
100
300 09 / 33068
ON N WESTERN AVE FROM W MADISON ST TO W LAKE ST
5.0
06/02/08
06/13/08
1,391 04/01/08
12/01/08
0
100
300 11 / 32191
ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST
20.64
11/14/08
12/16/08
7,061 11/14/08
12/16/08
6,646
100
300 09 / 33068
ON S DEARBORN ST FROM W CONGRESS PKWY TO W POLK ST
5.0
04/01/08
12/01/08
700 04/01/08
12/01/08
0
0
300 09 / 33068
ON S FEDERAL ST FROM W HARRISON ST TO W POLK ST
8.0
04/01/08
12/01/08
1,860 04/01/08
12/01/08
1,600
100
300 09 / 33068
ON S LEAVITT ST FROM W JACKSON BLVD TO W VAN BUREN ST
3.0
06/02/08
06/20/08
878 04/01/08
12/01/08
0
100
300 09 / 33068
ON S LOOMIS ST FROM W JACKSON BLVD TO W HARRISON ST
3.0
06/02/08
06/20/08
600 04/01/08
12/01/08
0
0
300 09 / 33068
ON S LOOMIS ST FROM W TAYLOR ST TO W ROOSEVELT RD
1.0
01/05/09
01/09/09
200 01/05/09
01/09/09
85
100
300 09 / 33068
ON S OAKLEY BLVD FROM W JACKSON BLVD TO W VAN BUREN ST
3.0
06/02/08
06/20/08
878 04/01/08
12/01/08
0
100
300 11 / 32191
ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST
32.19
11/14/08
12/16/08
12,180 11/14/08
12/16/08
10,365
100
300 11 / 32191
ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST
10.32
300 09 / 33068
ON S WABASH AVE FROM E 23RD ST TO E 24TH PL
300 09 / 33068
ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST
300 09 / 33068
ON W ADAMS ST FROM S MORGAN ST TO S RACINE AVE
300 09 / 33068
ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD
300 11 / 32191
ON W FIFTH AVE FROM S SACRAMENTO BLVD TO S MOZART ST
300 07 0002 / 5425
ON W HARRISON ST FROM S MAPLEWOOD AVE TO S OAKLEY BLVD
300 09 / 33068
ON W JACKSON BLVD FROM S LEAVITT ST TO S WESTERN AVE
300 11 / 32191
ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE
300 09 / 33068
3,696
0
0
232
100
2.0
06/09/08
06/13/08
400 04/01/08
12/01/08
18.05
06/02/08
06/20/08
5,020 04/01/08
12/01/08
0
100
5.0
10/07/08
10/22/08
2,050 10/07/08
10/22/08
1,625
100
6.08
06/02/08
06/20/08
1,691 04/01/08
12/01/08
0
100
1.0
11/14/08
12/15/08
200 11/14/08
12/15/08
200
100
22.0
04/18/06
11/18/06
8,750 10/20/06
10/21/06
0
100
8.0
06/02/08
06/20/08
2,344 04/01/08
12/01/08
0
100
12.16
11/14/08
12/15/08
4,484 11/14/08
12/15/08
3,916
100
ON W MADISON ST FROM S DAMEN AVE TO S SACRAMENTO BLVD
14.0
02/01/08
04/11/08
3,894 04/01/08
12/01/08
0
100
300 09 / 33068
ON W MONROE ST FROM S CAMPBELL AVE TO S FRANCISCO AVE
6.0
06/02/08
06/20/08
1,669 04/01/08
12/01/08
0
100
300 09 / 33068
ON W MONROE ST FROM S RACINE AVE TO S ABERDEEN ST
4.0
07/01/08
07/07/08
2,000 07/01/08
07/07/08
1,540
100
300 09 / 33068
ON W POLK ST FROM S DEARBORN ST TO S CLARK ST
3.0
04/01/08
12/01/08
780 04/01/08
12/01/08
450
100
300 11 / 32191
ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE
5.32
11/14/08
12/16/08
1,862 11/14/08
12/16/08
1,713
100
300 09 / 33068
ON W WARREN BLVD FROM N DAMEN AVE TO N WESTERN AVE
7.0
06/02/08
06/20/08
1,947 04/01/08
12/01/08
0
100
300 11 / 32191
ON W WARREN BLVD FROM N SACRAMENTO BLVD TO N WESTERN AVE
17.0
11/14/08
12/15/08
6,550 11/14/08
12/15/08
5,474
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 36
1/1/2008 AND 12/31/2008
Ward 02 Bob Fioretti CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 11 / 32191
ON W WASHINGTON BLVD FROM N ALBANY AVE TO N WESTERN AVE
18.0
11/14/08
12/16/08
6,750 11/14/08
12/16/08
5,796
0
300 09 / 33068
ON W WASHINGTON BLVD FROM N DAMEN AVE TO N WESTERN AVE
8.0
06/02/08
06/20/08
2,226 04/01/08
12/01/08
0
100
300 09 / 33068
ON W WILCOX ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
4.0
06/02/08
06/20/08
1,112 04/01/08
12/01/08
0
100
300 09 / 33068
S ASHLAND AVE AND W CONGRESS PKWY
1.0
3,200
0
0
300 09 / 33068
S RACINE AVE AND W VAN BUREN ST
1.0
2,800
0
0
283.36
98,719
48,185
Totals per Traffic Equipment Painting
Work Category: Transit Work Type: Two-way Conversion 210 06 0165 / 4416
ON S FINANCIAL PL FROM W JACKSON BLVD TO W VAN BUREN ST
Locations 1.0
10/15/02
12/02/02
20,000 10/07/02
10/11/02
3,618
Totals per Construction Phase
7,500,637
8,433,866
Totals for Ward 02
7,599,287
8,530,059
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 37
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0244 / 5354
ROBERT TAYLOR A (CHA)
.0
04/08/08
06/08/09
0
300 06 0244 / 5354
ROBERT TAYLOR B (CHA)
1.0
10/29/02
06/30/03
0 03/20/06
300 06 0243 / 5353
STATEWAY GARDENS
1.0
06/28/01
43,054
70
300 06 0313 / 5419
WENTWORTH GARDEN (CHA)
.0
04/17/06
09/29/06
70,000 04/17/06
09/30/06
35,000
100
300 06 0308 / 5414
ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST
300 06 0292 / 5399
1725 S CLARK ST
281 00 / 33670
4100 S MICHIGAN AVE
300 06 0282 / 5390
5546 S STATE ST
281 00 / 33670
1935 S WABASH AVE
300 06 0292 / 5399
5014 S WELLS ST
300 06 0292 / 5399
1512 W 47TH ST
1.0
Totals per Design/Engineering
04/04/06
0 06/28/01
0
0
14,346
100
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,721
100
1.0
02/15/05
03/04/05
1,000 11/05/04
03/18/05
789
100
.0
01/01/08
12/31/08
1.0
11/04/04
01/03/05
.0
01/01/08
12/31/08
1.0
02/15/05
02/22/05
03/01/05
03/30/05
6.0
0
0
0
01/03/05
800
100
0
0
800 01/04/05
04/05/05
609
100
2,000 03/08/05
05/17/05
1,539
100
800 11/19/04 0
74,600
98,858
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 38
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233
Fixtures 0 05/21/02
05/21/02
1,125
100
0 02/28/02
03/05/02
1,582
100
840 04/12/02
04/12/02
812
100
840 01/25/02
01/25/02
812
100
0 02/28/02
03/05/02
1,809
100
609 01/25/02
01/25/02
609
100
1,200 06/23/08
06/27/08
792
100
7.0
0 02/28/02
03/05/02
2,625
100
7.0
0 02/28/02
03/05/02
2,625
100
4.0
300 06 0069 / 5233
ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON E 44TH ST FROM S INDIANA AVE TO S VINCENNES AVE
300 06 0069 / 5233
ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
4.0
04/15/02
04/15/02
302 00 0092 / 5774
4.0
01/28/02
01/28/02
300 06 0069 / 5233
ON E 45TH ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON E 45TH ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
302 00 0092 / 5774
ON E 45TH ST FROM S MICHIGAN AVE TO S INDIANA AVE
3.0
01/28/02
01/28/02
300 09 / 33069
ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE
3.0
06/23/08
06/27/08
300 06 0069 / 5233
Materials Ordered Note Last Updated on 12-JUN-08 ON E 46TH ST FROM S INDIANA AVE TO S CALUMET AVE
300 06 0069 / 5233
ON E 48TH ST FROM S WABASH AVE TO S VINCENNES AVE
300 09 / 33069
ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE
300 11 / 32192
7.0
8.0
2.75
06/25/08
06/27/08
1,100 06/25/08
06/26/08
756
100
Materials Ordered Note Last Updated on 12-JUN-08 ON S CALUMET AVE FROM E 42ND ST TO E 44TH ST
8.0
12/19/07
04/03/08
2,800 12/19/07
12/19/07
1,171
100
300 06 0069 / 5233
ON S CALUMET AVE FROM E 43RD ST TO E 48TH ST
25.0
0 02/28/02
03/05/02
5,653
100
300 11 / 32192
ON S CALUMET AVE FROM E 49TH ST TO E 53RD ST
12.0
12/19/07
04/03/08
4,200 12/19/07
12/19/07
1,756
100
300 11 / 32192
ON S DR MARTIN LUTHER KING JR DR FROM E 42ND ST TO E 44TH ST
8.0
12/19/07
04/04/08
2,800 12/19/07
12/19/07
1,171
100
300 06 0069 / 5233
ON S PRAIRIE AVE FROM E 43RD ST TO E 48TH ST
25.0
0 02/28/02
03/05/02
5,653
100
300 11 / 32192
ON S PRAIRIE AVE FROM E 47TH ST TO E 48TH ST
4.0
12/19/07
04/04/08
1,400 12/19/07
12/19/07
586
100
300 11 / 32192
ON S PRAIRIE AVE FROM E 51ST ST TO E 53RD ST
11.0
10/01/07
10/05/07
4,600 10/09/07
10/09/07
1,610
100
302 00 0092 / 5774
ON S VINCENNES AVE FROM E 47TH ST TO E 44TH ST
13.0
01/28/02
01/28/02
2,730 01/25/02
01/25/02
2,639
100
300 09 / 33069
ON S WELLS ST FROM W PERSHING RD TO W ROOT ST
3.0
07/21/08
07/22/08
1,200 06/25/08
06/27/08
849
100
300 06 0069 / 5233
Materials ordered Note Last Updated on 12-JUN-08 456 E 42ND ST
1.0
0 05/21/02
05/21/02
375
100
302 00 0092 / 5774
4501 S MARSHFIELD AVE
3.0
0 02/23/01
02/23/01
617
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
162.75
24,319
35,627
7,956,351
3,793,625
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 39
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 09 / 33068
ON E 14TH PL FROM S STATE ST TO S WABASH AVE
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
2.0
01/28/09
02/02/09
800 01/28/09
02/02/09
644
100
1.40
05/28/08
06/20/08
588 04/01/08
12/01/08
438
300 11 / 32192
100
ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST
139.0
12/01/07
01/01/08
56,600 09/25/07
10/24/07
39,708
100
300 05 0003 / 5118
ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST
30.0
07/01/06
08/01/06
300 09 / 33068
ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST
1.62
05/29/08
06/20/08
648 04/01/08
12/01/08
507
100
300 09 / 33069
ON S MICHIGAN AVE FROM E 42ND ST TO E 43RD ST
7.0
06/26/08
06/27/08
2,800 06/26/08
06/27/08
2,080
100
300 06 0225 / 5340
Materials Ordered Note Last Updated on 12-JUN-08 ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST
06/05/03
06/13/03
5,000 06/05/03
06/13/03
9,026
100
300 09 / 33068
E 31ST ST AND S INDIANA AVE
7.0
06/02/08
06/20/08
2,800 06/02/08
06/06/08
2,191
100
300 09 / 33069
S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD
2.0
10/31/08
10/31/08
800 10/31/08
10/31/08
546
100
Totals per 400 Watt Changeout
190.02
4,400
74,436
0
55,140
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 40
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0069 / 5233
436 E 46TH ST
1.0
0 02/26/02
02/26/02
350
100
302 00 0092 / 5774
447 E BOWEN AVE
1.0
0 01/18/02
01/18/02
236
100
302 00 0092 / 5774
469 E BOWEN AVE
1.0
0 12/04/01
12/04/01
236
100
302 00 0092 / 5774
4300 S CALUMET AVE
1.0
0 01/10/02
01/10/02
236
100
300 06 0139 / 5289
4645 S DR MARTIN LUTHER KING JR DR
973.0
24,388 04/01/06
05/10/06
29,398
100
302 00 0092 / 5774
4645 S DR MARTIN LUTHER KING JR DR
28.0
0 02/01/01
12/31/01
6,598
100
805 06 1781 / 7967
5224 S INDIANA AVE
1.0
04/29/97
04/29/97
0 04/29/97
04/29/97
300
100
805 06 1863 / 8049
4611 S MARSHFIELD AVE
1.0
07/03/96
07/03/96
0 07/03/96
07/03/96
300
100
805 06 0410 / 6596
2103 S STATE ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0444 / 6630
2111 S STATE ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0445 / 6631
2123 S STATE ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0446 / 6632
2147 S STATE ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1517 / 7703
5659 S UNION AVE
1.0
10/30/97
10/30/97
0 10/30/97
10/30/97
300
100
805 06 0396 / 6582
4729 S VINCENNES AVE
1.0
08/31/95
08/31/95
0 08/31/95
08/31/95
300
100
805 06 0400 / 6586
1802 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0401 / 6587
1810 S WABASH AVE
1.0
02/14/95
02/14/95
0 02/14/95
02/14/95
300
100
805 06 0402 / 6588
1812 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0386 / 6572
1832 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0404 / 6590
1848 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0395 / 6581
1910 S WABASH AVE
1.0
02/14/95
02/14/95
0 02/14/95
02/14/95
300
100
805 06 0376 / 6562
1940 S WABASH AVE
1.0
02/14/95
02/14/95
0 02/14/95
02/14/95
300
100
805 06 0377 / 6563
2004 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0379 / 6565
2042 S WABASH AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
300 06 0069 / 5233
520 W GARFIELD BLVD
1.0
0 02/26/02
02/26/02
350
100
300 06 0069 / 5233
540 W GARFIELD BLVD
1.0
0 02/26/02
02/26/02
350
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping
03/01/06
09/01/06
1,024.0
24,388
42,854
Lamps
300 06 0215 / 5336
4645 S DR MARTIN LUTHER KING JR DR
1,088.0
06/01/07
12/31/07
32,030 10/18/07
10/24/07
31,062
100
300 06 0238 / 5352
4645 S DR MARTIN LUTHER KING JR DR
1,495.0
06/22/07
12/31/07
44,012 10/01/07
10/24/07
42,682
100
Totals per Arterial Group Relamping
2,583.0
76,042
73,744
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 41
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4645 S DR MARTIN LUTHER KING JR DR
Work Type: Direct Burial Cable 300 06 0277 / 5385
STATEWAY GARDENS
Work Type: Flood Light Install
Installations 2,488.0
0 07/06/02
07/09/02
45,302
100
27,782
100
Locations 1.0
05/01/04
05/31/04
25,000 05/01/04
Fixtures
300 06 0198 / 5323
ROBERT TAYLOR A (CHA)
56.0
01/19/01
01/31/01
96,104 01/19/01
01/31/01
49,020
100
300 06 0198 / 5323
ROBERT TAYLOR B (CHA)
56.0
01/19/01
01/31/01
0 01/19/01
01/31/01
37,447
100
300 06 0198 / 5323
STATEWAY GARDENS
44.0
01/02/01
01/16/01
251,500 01/02/01
01/16/01
146,728
100
300 06 0198 / 5323
WENTWORTH GARDEN (CHA)
06/11/01
06/13/01
23,024 04/16/01
04/20/01
23,024
100
300 06 0167 / 5306
E 35TH ST AND S WABASH AVE
3.0
0 06/10/99
06/10/99
1,053
100
302 00 0092 / 5774
W 45TH PL AND S PRINCETON AVE
2.0
0 05/02/01
05/02/01
941
100
302 00 0092 / 5774
W 45TH ST AND S PRINCETON AVE
3.0
0 05/02/01
05/02/01
1,412
100
302 00 0092 / 5774
4502 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4514 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4526 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4534 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4540 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4550 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4558 S PRINCETON AVE
1.0
0 08/25/01
08/25/01
404
100
302 00 0092 / 5774
4600 S PRINCETON AVE
2.0
0 05/02/01
05/02/01
941
100
300 06 0167 / 5306
4600 S STEWART AVE
1.0
0 07/20/99
07/20/99
351
100
300 09 / 33069
4420 S VINCENNES AVE
3.0
1,500 07/28/08
07/29/08
1,245
100
302 00 0092 / 5774
43 W 24TH ST
1.0
0 11/14/01
11/14/01
404
100
302 00 0092 / 5774
239 W SWANN ST
1.0
0 04/05/01
04/05/01
471
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
07/28/08
07/29/08
179.0
372,128
265,865
Blocks
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Lighting Imprvmnts
.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 42
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts
Installations
300 06 0244 / 5354
ROBERT TAYLOR A (CHA)
.0
06/26/09
04/06/10
300 06 0244 / 5354
ROBERT TAYLOR B (CHA)
1.0
05/01/06
12/31/07
1,576,800 06/05/06
300 06 0243 / 5353
STATEWAY GARDENS
.0
01/02/04
12/15/06
2,027,600 12/15/03
12/15/06
68,140
8
300 06 0313 / 5419
WENTWORTH GARDEN (CHA)
.0
05/01/07
09/28/07
686,000 02/17/06
12/18/06
14,126
100
300 06 0292 / 5399
1725 S CLARK ST
.0
03/31/05
04/12/05
12,136 03/31/05
04/12/05
10,573
100
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
300 06 / 33449
3700-3900 S VINCENNES AVE
.0
06/04/08
07/15/08
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
300 06 0292 / 5399
5014 S WELLS ST
.0
03/01/05
12/31/05
6,065 05/20/05
06/06/05
4,184
100
300 06 0292 / 5399
1512 W 47TH ST
.0
03/01/05
12/31/05
12,587 06/28/05
07/05/05
11,160
100
1.0
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts
0
0 36,000 06/20/08 0
4,357,188
0
0
467,688
95
0
0
35,755
60
611,626
Projects
300 06 0110 / 5265
ON S STATE ST FROM W 27TH ST TO W 30TH ST
1.0
300 06 0201 / 5325
E 41ST ST AND S INDIANA AVE
1.0
300 06 0110 / 5265
2900-3000 S FEDERAL ST
1.0
11/10/98
12/01/98
01/20/99
0 11/01/98
12/01/98
3.0
Totals per Lighting Imprvmnts
12,500 11/01/98
12,500 11/01/98
01/20/99
5,998
100
623
100
5,998
100
25,000
12,619
Blocks
Work Type: Loop Lighting 281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
0
0
0
.0
Totals per Loop Lighting
Work Type: Ornamental - Piggyback Lighting
Fixtures
300 09 / 33068
ON E 14TH PL FROM S STATE ST TO S WABASH AVE
300 09 / 33068
ON E 31ST ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
300 09 / 33069
S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD
Totals per Ornamental - Piggyback Lighting
1.0
01/28/09
02/02/09
1,350 01/28/09
02/02/09
1,000
100
2.24
12/15/08
12/31/08
3,024 12/01/08
12/09/08
2,566
100
4.0
10/31/08
10/31/08
5,400 10/31/08
10/31/08
4,193
100
7.24
9,774
7,759
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 43
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting
Blocks
300 03 0003 / 4874
4600-4700 S DR MARTIN LUTHER KING JR DR
.0
11/29/06
12/08/06
0
0
75
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
300 11 / 32192
5627 S SHIELDS AVE
1.0
1,000
0
0
281 00 / 33670
1935 S WABASH AVE
.0
0
0
0
1,000
0
Totals per Ornamental Lighting
Work Type: POD Camera Pole
01/01/08
12/31/08
1.0
Poles
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
0
0
0
0
0
Totals per POD Camera Pole
Work Type: Residential Regrouping 300 06 0270 / 5378
5046 S STATE ST
.0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 44
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33069
ON E 38TH ST FROM S GILES AVE TO S DR MARTIN LUTHER KING JR DR
1.0
65,000
0
0
300 09 / 33069
1.0
65,000
0
0
300 09 / 33069
ON E 42ND ST FROM S DR MARTIN LUTHER KING JR DR TO S VINCENNES AVE ON S CALUMET AVE FROM E 38TH ST TO E PERSHING RD
65,000 04/01/08
12/01/08
0
0
300 07 0003 / 5426
ON S CALUMET AVE FROM E 45TH ST TO E 47TH ST
2.0
04/15/07
06/15/07
170,000 03/01/07
05/04/07
112,739
100
300 09 / 33069
ON S CALUMET AVE FROM E 51ST ST TO E 53RD ST
2.0
04/02/08
05/13/08
155,000 04/01/08
12/01/08
140,000
100
300 09 / 33069
ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST
.50
04/02/08
05/13/08
37,500 04/01/08
12/01/08
20,204
100
300 09 / 33069
ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST
.50
0
0
300 09 / 33069
ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33069
ON S GILES AVE FROM E 37TH ST TO E PERSHING RD
2.0
03/10/08
05/09/08
130,000 04/01/08
12/01/08
117,868
100
300 09 / 33069
ON S JUSTINE ST FROM W 45TH ST TO W 46TH ST
1.0
03/10/08
05/09/08
60,000 04/01/08
12/01/08
62,057
100
300 09 / 33069
ON S LOWE AVE FROM W 51ST ST TO W 54TH ST
3.0
02/18/08
05/09/08
275,000 04/01/08
12/01/08
187,621
100
300 09 / 33069
ON S PRAIRIE AVE FROM E 33RD BLVD TO E 35TH ST
.52
33,800 04/01/08
12/01/08
0
0
300 07 0003 / 5426
ON S PRINCETON AVE FROM W 53RD ST TO W GARFIELD BLVD
2.0
05/01/07
07/01/07
200,000 03/21/07
07/06/07
110,513
100
300 07 0003 / 5426
ON S PRINCETON AVE FROM W GARFIELD BLVD TO W 57TH ST
2.0
04/20/07
07/01/07
200,000 03/12/07
06/14/07
101,516
100
300 09 / 33069
ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST
.50
32,500 04/01/08
12/01/08
0
0
300 06 0308 / 5414
ON S VINCENNES AVE FROM E 43RD ST TO E 45TH ST
2.0
03/16/06
12/31/06
224,237 09/18/06
04/06/07
167,169
100
300 07 0003 / 5426
ON S VINCENNES AVE FROM E 45TH ST TO E 47TH ST
2.0
04/10/07
06/10/07
170,000 03/19/07
06/15/07
111,580
100
300 09 / 33069
ON S WABASH AVE FROM E 42ND ST TO E 43RD ST
1.0
65,000 04/01/08
12/01/08
0
0
300 05 0011 / 5126
ON W 46TH ST FROM S STEWART AVE TO S UNION AVE
1.0
04/04/05
11/18/05
85,000 09/08/05
11/11/05
50,929
100
300 07 0003 / 5426
ON W 49TH PL FROM S UNION AVE TO S HALSTED ST
1.0
04/01/07
06/01/07
56,000 03/09/07
05/04/07
42,760
100
300 07 0003 / 5426
ON W 50TH PL FROM S HALSTED ST TO S PEORIA ST
1.0
04/01/07
06/01/07
85,000 03/09/07
05/04/07
42,760
100
300 07 0003 / 5426
ON W 50TH PL FROM S UNION AVE TO S HALSTED ST
1.0
04/01/07
06/01/07
57,000 03/09/07
05/04/07
42,760
100
300 07 0003 / 5426
ON W 50TH ST FROM S HALSTED ST TO S PEORIA ST
1.0
04/01/07
06/01/07
85,000 03/09/07
05/04/07
42,760
100
300 07 0003 / 5426
ON W 50TH ST FROM S UNION AVE TO S HALSTED ST
1.0
04/01/07
06/01/07
57,000 03/09/07
05/04/07
42,760
100
300 07 0003 / 5426
E 43RD ST AND S VERNON AVE
1.0
04/15/07
05/15/07
42,500 03/19/07
06/15/07
12,345
100
Totals per Residntl Staggered Lighting
1.0
31.02
32,500
2,448,037
1,408,341
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 45
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 03 0002 / 4873
ON S GILES AVE FROM E 31ST ST TO E 35TH ST
.24
38,400 09/09/04
12/31/04
22,216
100
300 06 0166 / 5305
ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST
1.0
10,023 11/07/00
11/11/00
0
100
300 06 0193 / 5318
ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST
1.0
0 11/07/00
11/11/00
34,869
100
300 06 0267 / 5375
ON S VINCENNES AVE FROM E 47TH ST TO E 48TH ST
2.0
10/01/04
12/30/04
176,292 10/21/04
12/21/04
143,894
100
300 06 0235 / 5349
ON W 54TH PL FROM S WALLACE ST TO S HALSTED ST
2.0
06/30/03
08/29/03
122,274 06/18/03
10/03/03
129,873
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial
09/15/04
11/15/04
6.24
346,989
330,852
Locations
302 00 0092 / 5774
4521 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4541 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4621 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4647 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
281 00 / 33670
4100 S MICHIGAN AVE
302 00 0092 / 5774
4517 S PAULINA ST
1.0
0 02/23/01
302 00 0092 / 5774
4539 S PAULINA ST
1.0
302 00 0092 / 5774
4619 S PAULINA ST
1.0
302 00 0092 / 5774
4645 S PAULINA ST
1.0
281 00 / 33670
1935 S WABASH AVE
Totals per Short Arm Installs - Arterial
Work Type: Short Arm Installs - Residntl
.0
.0
01/01/08
01/01/08
12/31/08
12/31/08
8.0
0
0
0
02/23/01
378
100
0 02/23/01
02/23/01
378
100
0 02/23/01
02/23/01
378
100
0 02/23/01
02/23/01
378
100
0
0
0
0
3,024
Locations
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Short Arm Installs - Residntl
.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 46
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0081 / 5244
ON E 18TH ST FROM S WABASH AVE TO S INDIANA AVE
2.08
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
1.40
302 00 0077 / 5765
ON E 35TH ST FROM S STATE ST TO S DR MARTIN LUTHER KING JR DR
300 09 / 33069
ON E 46TH PL FROM S VINCENNES AVE TO S ST LAWRENCE AVE
302 00 0077 / 5765
ON S CLARK ST FROM W 17TH ST TO W 18TH ST
300 11 / 32192
ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST
125.0
07/20/07
300 05 0003 / 5118
ON S DR MARTIN LUTHER KING JR DR FROM E 46TH ST TO E 48TH ST
28.0
04/04/05
300 06 0108 / 5263
ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST
90.0
300 09 / 33068
ON S INDIANA AVE FROM E 29TH ST TO E 31ST ST
1.62
302 00 0077 / 5765
ON S STATE ST FROM W 17TH ST TO E 18TH ST
19.0
300 09 / 33069
ON S WELLS ST FROM W PERSHING RD TO W ROOT ST
300 06 0225 / 5340
ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST
300 09 / 33069
S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD
4.0
300 06 0081 / 5244
1800 S WABASH AVE
2.0
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc
0 05/23/98
05/23/98
132
100
350 06/13/07
06/24/08
294
100
0 08/25/99
08/31/99
1,529
100
600 06/23/08
06/27/08
378
0
0 11/11/99
11/12/99
830
100
08/10/07
27,500 07/20/07
08/10/07
27,500
100
11/18/05
7,000 08/20/05
08/24/05
6,056
100
05/28/03
06/15/03
21,500 07/01/03
07/28/03
22,120
100
05/29/08
06/20/08
405 05/29/08
06/20/08
340
100
0 11/11/99
11/12/99
1,660
100
05/28/08
06/20/08
17.50 3.0
06/23/08
06/27/08
9.50
5.0
06/10/08
06/26/08
1,000 06/10/08
06/13/08
650
100
05/30/03
06/17/03
3,625 05/30/03
06/17/03
5,285
100
10/29/08
10/29/08
1,200 10/29/08
10/29/08
840
100
0 05/23/98
05/23/98
127
100
308.10
63,180
67,741
Blocks
281 00 / 33670
4100 S MICHIGAN AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1935 S WABASH AVE
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Strt Lighting 300 06 0225 / 5340
ON W TREMONT ST FROM S NORMAL AVE TO S STEWART AVE
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
4645 S DR MARTIN LUTHER KING JR DR
.0
Blocks 2.0
01/05/04
01/30/04
50,000 05/06/03
01/09/04
37,760
100
03/01/04
12/01/04
21,549 07/31/06
09/15/06
45,128
100
Lamps 4,144.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 47
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
302 00 0072 / 5760
330 E 40TH ST
805 06 2344 / 8530
1540 E 47TH DR
302 00 0071 / 5759
4000 S CALUMET AVE
300 06 0099 / 5260
4645 S DR MARTIN LUTHER KING JR DR
302 00 0071 / 5759
4830 S HALSTED ST
805 06 2387 / 8573
3901 S LA SALLE ST
6.0
302 00 0072 / 5760
5800 S LOWE AVE
1.0
805 06 2962 / 9148
5801 S LOWE AVE
6.0
01/21/93
805 06 2579 / 8765
4005 S MICHIGAN AVE
4.0
805 06 2264 / 8450
4901 S MORGAN ST
805 06 2280 / 8466
1.0
0 05/04/00
05/04/00
1,935
100
0 06/04/93
06/04/93
7,500
100
0 12/13/98
12/14/98
3,105
100
37,321 07/15/03
07/23/03
27,122
100
0 10/30/98
11/04/98
5,625
100
0 07/18/95
07/18/95
4,500
100
0 03/27/00
03/29/00
6,370
100
01/21/93
0 01/21/93
01/21/93
4,500
100
03/29/95
03/29/95
0 03/29/95
03/29/95
3,000
100
12.0
10/18/94
10/18/94
0 10/18/94
10/18/94
9,000
100
4901 S MORGAN ST
12.0
10/18/94
10/18/94
0 10/18/94
10/18/94
9,000
100
805 06 2551 / 8737
4005 S PRAIRIE AVE
4.0
04/12/95
04/12/95
0 04/12/95
04/12/95
3,000
100
302 00 0071 / 5759
4000 S PRINCETON AVE
0 11/08/98
11/13/98
4,654
100
805 06 2629 / 8815
1595 S STATE ST
0 11/08/93
11/08/93
9,000
100
302 00 0071 / 5759
4910 S UNION AVE
0 12/04/98
12/09/98
6,594
100
805 06 2841 / 9027
1598 S WABASH AVE
12.0
12/28/93
12/28/93
0 12/28/93
12/28/93
9,000
100
805 06 2577 / 8763
4020 S WABASH AVE
8.0
05/07/93
05/07/93
0 05/07/93
05/07/93
6,000
100
302 00 0071 / 5759
4000 S WELLS ST
0 11/27/98
12/01/98
4,654
100
302 00 0072 / 5760
3900 S WENTWORTH AVE
0 02/03/00
02/04/00
3,400
100
805 06 2643 / 8829
105 W 18TH ST
10.0
10/18/93
10/18/93
0 10/18/93
10/18/93
7,500
100
805 06 2702 / 8888
116 W 27TH ST
8.0
03/30/94
03/30/94
0 03/30/94
03/30/94
6,000
100
805 06 2699 / 8885
100 W 33RD ST
12.0
07/02/91
07/02/91
0 07/02/91
07/02/91
9,000
100
805 06 2700 / 8886
98 W 35TH ST
14.0
03/28/91
03/28/91
0 03/28/91
03/28/91
10,500
100
805 06 2701 / 8887
109 W 37TH ST
8.0
04/11/94
04/11/94
0 04/11/94
04/11/94
6,000
100
302 00 0071 / 5759
400 W 42ND PL
0 06/18/98
06/30/98
29,086
100
302 00 0071 / 5759
400 W 42ND ST
0 05/23/98
06/03/98
18,347
100
805 06 2803 / 8989
39 W 43RD ST
42.0
09/01/92
09/01/92
0 09/01/92
09/01/92
31,500
100
805 06 2538 / 8724
331 W 43RD ST
28.0
12/31/91
12/31/91
0 12/31/91
12/31/91
21,000
100
302 00 0070 / 5758
400 W 43RD ST
0 12/03/97
12/12/97
16,069
100
805 06 2154 / 8340
400 W 43RD ST
43.0
12/01/97
12/12/97
0 12/01/97
12/12/97
32,250
100
805 06 2696 / 8882
149 W 44TH ST
20.0
08/03/94
08/03/94
0 08/03/94
08/03/94
15,000
100
10.0
664.0
12.0
06/04/93
07/15/03
07/18/95
11/08/93
06/04/93
07/23/03
07/18/95
11/08/93
1.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 48
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2703 / 8889
149 W 45TH PL
12.0
06/20/94
06/20/94
0 06/20/94
06/20/94
9,000
100
805 06 2698 / 8884
160 W 46TH ST
12.0
04/06/94
04/06/94
0 04/06/94
04/06/94
9,000
100
805 06 2520 / 8706
401 W 46TH ST
50.0
08/01/91
08/01/91
0 08/01/91
08/01/91
37,500
100
805 06 2791 / 8977
117 W 47TH ST
14.0
01/01/93
01/01/93
0 01/01/93
01/01/93
10,500
100
805 06 2561 / 8747
499 W 47TH ST
12.0
05/17/93
05/17/93
0 05/17/93
05/17/93
9,000
100
805 06 2628 / 8814
499 W 47TH ST
16.0
04/04/93
04/04/93
0 04/04/93
04/04/93
12,000
100
805 06 2548 / 8734
105 W 51ST ST
24.0
02/04/94
02/04/94
0 02/04/94
02/04/94
18,000
100
805 06 2479 / 8665
330 W 51ST ST
51.0
10/14/95
10/14/95
0 10/14/95
10/14/95
38,250
100
805 06 2480 / 8666
330 W 51ST ST
9.0
10/14/95
10/14/95
0 10/14/95
10/14/95
6,750
100
805 06 2481 / 8667
330 W 51ST ST
32.0
10/14/95
10/14/95
0 10/14/95
10/14/95
24,000
100
805 06 2483 / 8669
330 W 51ST ST
20.0
10/14/95
10/14/95
0 10/14/95
10/14/95
15,000
100
805 06 2484 / 8670
330 W 51ST ST
27.0
10/14/95
10/14/95
0 10/14/95
10/14/95
20,250
100
805 06 2485 / 8671
330 W 51ST ST
8.0
10/14/95
10/14/95
0 10/14/95
10/14/95
6,000
100
805 06 2486 / 8672
330 W 51ST ST
8.0
10/14/95
10/14/95
0 10/14/95
10/14/95
6,000
100
805 06 2505 / 8691
330 W 51ST ST
15.0
10/14/95
10/14/95
0 10/14/95
10/14/95
11,250
100
805 06 2506 / 8692
330 W 51ST ST
16.0
10/14/95
10/14/95
0 10/14/95
10/14/95
12,000
100
805 06 2497 / 8683
629 W 51ST ST
13.0
10/14/95
10/14/95
0 10/14/95
10/14/95
9,750
100
805 06 2498 / 8684
629 W 51ST ST
8.0
10/14/95
10/14/95
0 10/14/95
10/14/95
6,000
100
805 06 2500 / 8686
629 W 51ST ST
9.0
10/14/95
10/14/95
0 10/14/95
10/14/95
6,750
100
805 06 2501 / 8687
629 W 51ST ST
17.0
10/14/95
10/14/95
0 10/14/95
10/14/95
12,750
100
805 06 2502 / 8688
629 W 51ST ST
16.0
10/14/95
10/14/95
0 10/14/95
10/14/95
12,000
100
805 06 2503 / 8689
629 W 51ST ST
12.0
10/14/95
10/14/95
0 10/14/95
10/14/95
9,000
100
805 06 2504 / 8690
629 W 51ST ST
10.0
10/14/95
10/14/95
0 10/14/95
10/14/95
7,500
100
805 06 2359 / 8545
101 W 53RD ST
12.0
02/02/94
02/02/94
0 02/02/94
02/02/94
9,000
100
805 06 2487 / 8673
699 W 54TH PL
28.0
10/20/94
10/20/94
0 10/20/94
10/20/94
21,000
100
805 06 2678 / 8864
105 W 57TH ST
12.0
07/19/94
07/19/94
0 07/19/94
07/19/94
9,000
100
805 06 2826 / 9012
595 W 57TH ST
12.0
03/05/93
03/05/93
0 03/05/93
03/05/93
9,000
100
805 06 2847 / 9033
599 W 58TH ST
8.0
10/17/94
10/17/94
0 10/17/94
10/17/94
6,000
100
805 06 2339 / 8525
500 W GARFIELD BLVD
16.0
03/29/93
03/29/93
0 03/29/93
03/29/93
12,000
100
805 06 2950 / 9136
127 W PERSHING RD
12.0
01/01/91
01/01/91
0 01/01/91
01/01/91
9,000
100
805 06 2563 / 8749
61 W ROOT ST
12.0
01/24/94
01/24/94
0 01/24/94
01/24/94
9,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 49
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting Totals per Underpass Lighting
Fixtures 1,461.0
37,321
722,461
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 50
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S ARCHER AVE AND S STATE ST
1.0
0 01/14/02
01/14/02
6,427
100
210 06 0130 / 4389
S CLARK ST AND S ARCHER AVE
.50
0 09/10/01
09/10/01
4,472
100
Totals per LED Signal Head Install
Work Type: Removal Temp Wiring - Signals
1.50
0
Crossings
300 06 0197 / 5322
S DR MARTIN LUTHER KING JR DR AND E 37TH ST
.50
300 06 0197 / 5322
S INDIANA AVE AND E 43RD ST
1.0
300 06 0197 / 5322
S MICHIGAN AVE AND E 43RD ST
1.0
04/20/01
300 06 0197 / 5322
S WABASH AVE AND E 41ST ST
1.0
04/24/01
Totals per Removal Temp Wiring - Signals
Work Type: Signal Removal 300 06 0117 / 5271
3500 S WABASH AVE
Work Type: Signals 300 06 0096 / 5258
4645 S DR MARTIN LUTHER KING JR DR
Work Type: TSM Install
10,899
03/16/01
04/20/01
2,000 03/16/01
06/07/01
2,748
100
4,000 04/12/01
04/27/01
7,914
100
04/25/01
4,000 04/20/01
04/25/01
4,362
100
05/01/01
4,000 04/12/01
04/13/01
144
100
3.50
14,000
15,168
Locations 1.0
5,255 07/17/99
08/26/99
2,371
100
9,645
100
Intersections 61.0
08/18/03
08/25/03
0 08/20/03
08/25/03
Locations
814 06 0281 / 16493
4500 S ASHLAND AVE
1.0
08/23/90
08/23/90
0 08/23/90
08/23/90
90,100
100
814 06 0115 / 16330
3900 S DR MARTIN LUTHER KING JR DR
1.0
04/26/94
04/26/94
0 04/26/94
04/26/94
188,654
100
814 06 0214 / 16426
2400 S STATE ST
1.0
10/25/94
10/25/94
0 10/25/94
10/25/94
120,000
100
814 06 0346 / 16544
2400 S STATE ST
1.0
08/01/96
08/01/96
0 08/01/96
04/04/97
200,000
100
814 06 0142 / 16356
1600 S WABASH AVE
1.0
09/24/97
09/24/97
0 09/24/97
09/24/97
200,000
100
814 06 0126 / 16340
1800 S WABASH AVE
1.0
09/24/97
09/24/97
0 09/24/97
09/24/97
200,000
100
814 06 0127 / 16341
2000 S WABASH AVE
1.0
09/24/97
09/24/97
0 09/24/97
09/24/97
200,000
100
814 06 0100 / 16315
3900 S WABASH AVE
1.0
04/25/94
04/25/94
0 04/25/94
04/25/94
85,397
100
Totals per TSM Install Totals per Traffic
8.0
0
1,284,151
35,033
1,337,314
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 51
1/1/2008 AND 12/31/2008
Ward 03 Pat Dowell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 09 / 33068
ON E 31ST ST FROM S INDIANA AVE TO S DR MARTIN LUTHER KING JR DR
.14
05/28/08
06/20/08
28 04/01/08
12/01/08
12
100
300 11 / 32192
ON S DR MARTIN LUTHER KING JR DR FROM E 41ST ST TO E 46TH ST
33.0
07/20/07
08/10/07
11,550 07/20/07
08/10/07
11,550
100
300 09 / 33068
E 31ST ST AND S INDIANA AVE
10.0
06/02/08
06/20/08
3,800 06/02/08
06/20/08
3,225
100
300 09 / 33069
S DR MARTIN LUTHER KING JR DR AND E OAKWOOD BLVD
2.0
10/29/08
10/29/08
400 10/29/08
10/29/08
294
100
Totals per Traffic Equipment Painting
45.14
15,778
15,081
Totals per Construction Phase
7,991,384
5,130,939
Totals for Ward 03
8,065,984
5,229,797
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 52
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0245 / 5355
IDA B WELLS HOMES
.0
03/01/02
02/28/03
0 03/01/02
02/28/05
57,776
100
300 06 0308 / 5414
ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,592
100
300 06 / 32146
ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST
1.0
05/01/07
10/31/07
6,000
2,500
100
300 06 0282 / 5390
353 E 26TH ST
1.0
11/05/04
12/14/04
1,000 11/01/04
1,859
100
Totals per Design/Engineering
2.0
7,000
12/14/04
64,727
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 53
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Fixtures
Work Type: 250 Watt Changeout 300 09 / 33069
ON E 50TH PL FROM S ST LAWRENCE AVE TO S VINCENNES AVE
300 05 0005 / 5120 300 06 0122 / 5275
2.25
06/25/08
06/27/08
900 06/25/08
06/26/08
619
100
Materials Ordered Note Last Updated on 12-JUN-08 ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
700 E 40TH ST
2.0
12/10/03
12/10/03
950 12/08/03
12/08/03
1,106
100
9.25
Totals per 250 Watt Changeout
3,850
2,980
Fixtures
Work Type: 400 Watt Changeout 300 09 / 33068
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
3.84
05/28/08
06/20/08
1,600 05/28/08
06/06/08
1,202
100
300 09 / 33069
ON E OAKWOOD BLVD FROM S VINCENNES AVE TO S DREXEL BLVD
10.0
06/26/08
06/27/08
4,000 06/26/08
06/27/08
3,000
100
Materials Ordered Note Last Updated on 12-JUN-08 Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
13.84
5,600
4,202
Installations
805 06 1049 / 7235
ON E 53RD ST FROM S WOODLAWN AVE TO S KIMBARK AVE
1.0
03/07/97
03/07/97
0 03/07/97
03/07/97
300
300 06 0096 / 5258
449 E 35TH ST
589.0
03/01/03
09/01/03
15,284 03/01/06
09/01/06
17,796
0
302 00 0092 / 5774
449 E 35TH ST
12.0
0 04/02/01
11/28/01
2,828
100
302 00 0092 / 5774
4105 S DREXEL AVE
1.0
300 06 0139 / 5289
4646 S DREXEL AVE
626.0
302 00 0092 / 5774
4646 S DREXEL BLVD
8.0
805 06 1544 / 7730
4141 S ELLIS AVE
1.0
10/23/97
805 06 0341 / 6527
4239 S LANGLEY AVE
1.0
02/14/95
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
4659 S COTTAGE GROVE AVE
Work Type: Arterial Strt Lighting/Lamps
03/01/06
100
0 06/08/01
06/08/01
236
100
14,445 04/01/06
04/15/06
18,914
100
0 01/31/01
01/15/02
1,885
100
10/23/97
0 10/23/97
10/23/97
300
100
02/14/95
0 02/14/95
02/14/95
300
100
09/01/06
1,239.0
29,729
42,559
Lamps 1,275.0
06/01/07
12/31/07
37,536 10/15/07
10/24/07
36,401
100
Installations
300 06 0053 / 5228
449 E 35TH ST
5,122.0
0 07/17/02
07/20/02
93,262
100
300 06 0053 / 5228
4646 S DREXEL BLVD
2,154.0
0 07/14/02
07/17/02
39,220
100
7,276.0
0
132,482
8,881,404
5,538,004
Totals per Arterial Strt Lighting/Lamps Totals per Lighting/Electrical
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 54
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 06 0198 / 5323
IDA B WELLS HOMES
04/25/01
05/15/01
85,465 04/20/01
05/11/01
107,793
100
300 06 0198 / 5323
LAKE PARK PLACE (CHA)
05/16/01
05/17/01
9,000 05/12/01
05/14/01
7,512
100
300 06 0198 / 5323
WASHINGTON PARK HOMES (CHA)
03/09/01
06/29/01
13,200 06/02/01
06/02/01
8,569
100
300 06 0167 / 5306
4715 S ELLIS AVE
2.0
0 05/20/99
05/20/99
188
100
300 06 0167 / 5306
4731 S ELLIS AVE
2.0
0 05/20/99
05/20/99
188
100
300 06 0167 / 5306
4752 S ELLIS AVE
2.0
0 05/20/99
05/20/99
188
100
300 06 0072 / 5235
5300 S HYDE PARK BLVD
0 07/05/01
07/05/01
2,382
08/03/01 6.0
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0245 / 5355
IDA B WELLS HOMES
300 06 0227 / 5342
LAKE PARK PLACE (CHA)
300 06 0210 / 5333
ON S DREXEL BLVD FROM E 41ST ST TO E BOWEN AVE
300 06 / 33449 300 06 / 33449
.0
10/01/04
05/29/07
1,561,200 12/12/03
107.0
05/01/02
12/15/05
1,727,200 06/12/02
90.0
07/23/02
12/15/05
2,225,200 08/14/02
600-800 E 37TH ST
.0
06/04/08
07/15/08
3700-3900 S VINCENNES AVE
.0
06/04/08
07/15/08
Work Type: Lighting Imprvmnts
197.0
.0
04/01/07
873,579
100
950,168
80
1,617,480
100
72,000 06/20/08
71,510
60
36,000 06/20/08
35,755
60
02/01/06
5,621,600
3,548,492
10/06/04
10/31/04
0 06/30/06
06/30/06
0
0
11/24/08
12/05/08
6,912 11/24/08
12/05/08
5,864
100
0 11/28/97
09/30/98
Fixtures
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
Work Type: Ornamental Lighting
126,820
Projects
353 E 26TH ST
Work Type: Ornamental - Piggyback Lighting 300 09 / 33068
107,665
Installations
Totals per Lighting Imprvmnts
300 06 0282 / 5390
09/28/01
5.12
Blocks
300 06 0063 / 5230
ON E 53RD ST FROM S WOODLAWN AVE TO S HARPER AVE
3.0
988
100
300 09 / 33071
ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST
1.0
135,000
0
0
4.0
135,000
988
0
0
Totals per Ornamental Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
4659 S COTTAGE GROVE AVE
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 55
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33070
ON E 40TH ST FROM S VINCENNES AVE TO S COTTAGE GROVE AVE
2.0
146,250 04/01/08
12/01/08
0
300 09 / 33070
ON E 41ST ST FROM S ST LAWRENCE AVE TO S VINCENNES AVE
1.0
65,000 04/01/08
12/01/08
0
0
300 11 / 32193
ON E 42ND ST FROM S COTTAGE GROVE AVE TO S ST LAWRENCE AVE
2.0
04/01/08
06/02/08
145,000 11/08/07
12/21/07
109,326
100
300 07 0004 / 5427
ON E 50TH ST FROM S CHAMPLAIN AVE TO S FORRESTVILLE AVE
1.0
07/10/06
08/18/06
65,000 01/08/07
05/07/07
56,412
100
300 07 0004 / 5427
2.0
07/05/06
09/01/06
170,000 03/13/07
05/11/07
101,516
100
300 09 / 33070
ON E BOWEN AVE FROM S COTTAGE GROVE AVE TO S ST LAWRENCE AVE ON E BOWEN AVE FROM S ST LAWRENCE AVE TO S VINCENNES AVE
65,000 04/01/08
12/01/08
0
0
300 09 / 33069
ON S CHAMPLAIN AVE FROM E 45TH ST TO E 46TH ST
.50
04/02/08
05/13/08
37,500 04/01/08
12/01/08
20,204
100
300 05 0004 / 5119
ON S CHAMPLAIN AVE FROM E 47TH ST TO E 49TH ST
2.0
09/01/05
10/15/05
170,000 08/22/05
10/07/05
108,764
100
300 07 0004 / 5427
ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST
.50
07/17/06
09/08/06
21,250 09/01/06
11/27/06
0
100
300 07 0005 / 5428
ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST
.50
04/01/07
06/01/07
21,250 09/01/06
11/27/06
0
100
300 09 / 33070
ON S ELLIS AVE FROM E 41ST ST TO E 43RD ST
2.0
146,250 04/01/08
12/01/08
0
0
300 05 0004 / 5119
ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST
2.0
04/04/05
11/18/05
80,000 07/05/05
08/15/05
0
100
300 06 0298 / 5405
ON S ELLIS AVE FROM E 45TH ST TO E 47TH ST
2.0
06/01/05
07/01/05
0 07/05/05
09/07/05
141,762
100
300 09 / 33070
ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST
.50
32,500 04/01/08
12/01/08
0
0
300 09 / 33071
ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST
.50
32,500
300 07 0004 / 5427
ON S ELLIS AVE FROM E OAKWOOD BLVD TO E 41ST ST
2.0
300 09 / 33069
ON S FORRESTVILLE AVE FROM E 43RD ST TO E 44TH ST
.50
300 09 / 33069
ON S FORRESTVILLE AVE FROM E 44TH ST TO E 43RD ST
300 06 0308 / 5414
1.0
0
0
100
0
0
08/18/06
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
ON S GREENWOOD AVE FROM E 47TH ST TO E 49TH ST
2.0
06/06/06
08/06/06
106,834 05/15/06
07/26/06
93,887
100
300 09 / 33070
ON S INGLESIDE AVE FROM E 53RD ST TO E 54TH ST
1.0
65,000 04/01/08
12/01/08
0
0
300 07 0004 / 5427
ON S LANGLEY AVE FROM E 47TH ST TO E 49TH ST
2.0
06/26/06
08/18/06
170,000 06/23/06
09/01/06
114,972
100
300 09 / 33069
ON S ST LAWRENCE AVE FROM E 47TH ST TO E 48TH ST
.50
32,500 04/01/08
12/01/08
0
0
300 06 / 32146
ON S WOODLAWN AVE FROM E HYDE PARK BLVD TO E 55TH ST
4.0
12/05/07
06/30/08
326,440
0
0
2,120,774
746,843
Totals per Residntl Staggered Lighting
01/15/07
0
06/19/06
31.50
190,000 06/19/06
0
32,500
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 56
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Strt Lighting/Lamps 300 03 0004 / 4875
ON E 50TH PL FROM S CHAMPLAIN AVE TO S COTTAGE GROVE AVE
2.0
11/01/04
12/31/04
160,000 11/24/04
04/01/05
101,483
100
300 06 0267 / 5375
ON S EVANS AVE FROM E 47TH ST TO E 49TH ST
2.0
10/01/04
12/01/04
186,059 08/27/04
11/19/04
178,444
100
300 06 0235 / 5349
ON S GREENWOOD AVE FROM E 43RD ST TO E 45TH ST
2.0
06/15/03
08/15/03
161,392 06/12/03
09/18/03
141,143
100
300 03 0004 / 4875
ON S GREENWOOD AVE FROM E 45TH ST TO E 47TH ST
2.0
10/15/04
12/15/04
160,000 11/15/04
04/01/05
107,774
100
300 06 0166 / 5305
ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST
1.0
10,023 11/07/00
11/11/00
0
100
300 06 0193 / 5318
ON S ST LAWRENCE AVE FROM E 45TH ST TO E 47TH ST
1.0
0 11/07/00
11/11/00
34,869
100
10.0
Totals per Residntl Strt Lighting/Lamps
Work Type: Strt Light Pole Painting
677,474
563,713
Locations
300 09 / 33068
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
3.52
05/28/08
06/20/08
880 06/06/07
06/10/08
739
100
300 04 0216 / 5114
ON E 47TH ST FROM S DREXEL BLVD TO S GREENWOOD AVE
19.0
05/01/06
11/01/06
4,109 05/17/06
06/22/06
4,109
100
300 04 0216 / 5114
ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE
14.50
05/01/06
11/01/06
3,100 05/17/06
09/09/06
3,100
100
300 11 / 32193
ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST
112.0
06/01/07
08/01/07
24,640 06/01/07
06/21/07
24,640
100
302 00 0076 / 5764
5200 S CORNELL AVE
5.0
06/04/98
06/04/98
0 06/04/98
06/04/98
85
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
154.02
32,729
32,673
Blocks
300 06 0134 / 5287
ON E 38TH PL FROM S VINCENNES AVE TO S LANGLEY AVE
1.0
08/01/99
09/30/99
16,333 08/01/99
09/01/99
6,158
100
300 06 0134 / 5287
ON E 38TH ST FROM S VINCENNES AVE TO S LANGLEY AVE
1.0
08/01/99
09/30/99
16,334 08/01/99
09/01/99
6,159
100
300 03 0004 / 4875
ON S LAKE PARK AVE FROM E 43RD ST TO E 46TH ST
3.0
08/30/04
09/08/04
12,500 08/30/04
09/13/04
6,721
100
300 06 0134 / 5287
600-699 E 37TH PL
1.0
08/01/99
09/30/99
16,333 08/01/99
09/01/99
6,158
100
6.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping
61,500
25,196
Lamps
300 06 0139 / 5289
449 E 35TH ST
1,730.0
03/01/04
12/01/04
8,996 07/31/06
09/11/06
18,839
100
300 06 0139 / 5289
4646 S DREXEL AVE
1,730.0
03/01/04
12/01/04
8,996 09/08/06
09/11/06
18,839
100
Totals per Traffic Signal Regrouping
3,460.0
17,992
37,678
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 57
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0099 / 5260
449 E 35TH ST
280.0
07/10/03
07/14/03
15,737 07/10/03
07/14/03
10,810
100
805 06 2147 / 8333
1405 E 47TH DR
46.0
06/04/93
06/04/93
0 06/04/93
06/04/93
34,500
100
805 06 2108 / 8294
1550 E 53RD ST
22.0
01/02/92
01/02/92
0 01/02/92
01/02/92
16,500
100
302 00 0070 / 5758
1600 E 53RD ST
0 10/24/97
11/01/97
17,176
100
302 00 0071 / 5759
1600 E 55TH ST
0 07/10/98
07/20/98
24,196
100
805 06 2164 / 8350
1538 E HYDE PARK BLVD
0 12/31/95
12/31/95
18,000
100
302 00 0070 / 5758
1600 E HYDE PARK BLVD
0 06/24/97
07/03/97
15,848
100
805 06 2116 / 8302
1600 E HYDE PARK BLVD
42.0
07/03/97
07/03/97
0 07/03/97
07/03/97
31,500
100
805 06 2403 / 8589
1045 E OAKWOOD BLVD
10.0
03/03/96
03/03/96
0 03/03/96
03/03/96
7,500
100
805 06 2404 / 8590
1057 E OAKWOOD BLVD
10.0
03/03/96
03/03/96
0 03/03/96
03/03/96
7,500
100
300 06 0099 / 5260
4646 S DREXEL AVE
130.0
07/24/03
07/25/03
7,306 07/24/03
07/25/03
4,082
100
805 06 2859 / 9045
405 W 31ST ST
26.0
02/26/90
02/26/90
0 02/26/90
02/26/90
19,500
100
805 06 2853 / 9039
401 W 33RD ST
32.0
02/12/89
02/12/89
0 02/12/89
02/12/89
24,000
100
Totals per Underpass Lighting
24.0
622.0
12/31/95
12/31/95
23,043
231,112
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 58
1/1/2008 AND 12/31/2008
Ward 04 Toni Preckwinkle CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install 210 06 0130 / 4389
Locations
S CORNELL AVE AND E 47TH ST
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
S DR MARTIN LUTHER KING JR DR AND E 37TH ST
300 06 0197 / 5322
S LAKE PARK AVE AND E 55TH ST
1.0
11/05/02
1,850
100
2,000 03/16/01
06/07/01
2,748
100
6,000 04/08/02
04/08/02
0
100
Crossings .50
03/16/01
04/20/01
1.50 2.0
Totals per Removal Temp Wiring - Signals
Work Type: Signals
0 11/05/02
8,000
2,748
Intersections
300 06 0096 / 5258
449 E 35TH ST
83.0
07/07/03
07/13/03
0 07/03/06
10/11/06
13,124
100
300 06 0096 / 5258
4646 S DREXEL AVE
40.0
08/18/03
08/25/03
0 08/13/03
08/20/03
6,325
100
123.0
Totals per Signals
Work Type: TSM Install
0
19,449
Locations
814 06 0092 / 16308
400 E 29TH ST
1.0
02/01/94
02/01/94
0 02/01/94
02/01/94
98,691
100
814 06 0090 / 16306
700 E 31ST DR
1.0
02/09/94
02/09/94
0 02/09/94
02/09/94
98,691
100
814 06 0094 / 16310
790 E 31ST DR
1.0
02/15/94
02/15/94
0 02/15/94
02/15/94
98,691
100
814 06 0095 / 16311
3099 S COTTAGE GROVE AVE
1.0
02/02/94
02/02/94
0 02/02/94
02/02/94
98,691
100
814 06 0243 / 16455
3099 S COTTAGE GROVE AVE
1.0
01/01/94
01/01/94
0 01/01/94
01/01/94
120,000
100
814 06 0101 / 16316
4300 S DREXEL BLVD
1.0
03/18/94
03/18/94
0 03/18/94
03/18/94
125,859
100
814 06 0165 / 16377
5500 S LAKE PARK AVE
1.0
08/01/96
02/07/97
0 08/01/96
02/07/97
200,000
100
814 06 0310 / 16522
3900 S VINCENNES AVE
1.0
01/10/89
01/10/89
0 01/10/89
01/10/89
85,266
100
8.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
0
925,889
Locations
300 09 / 33068
ON E 29TH ST FROM S DR MARTIN LUTHER KING JR DR TO S INDIANA AVE
300 11 / 32193
ON S COTTAGE GROVE AVE FROM E PERSHING RD TO E 51ST ST
.32
05/28/08
06/20/08
64 04/01/08
12/01/08
40
100
56.0
06/01/07
08/01/07
20,400 06/01/07
08/01/07
20,400
100
56.32
20,464
20,440
28,464
970,376
Totals per Construction Phase
8,909,868
6,508,379
Totals for Ward 04
8,916,868
6,573,106
Totals per Traffic Equipment Painting Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 59
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE
4.0
04/01/08
08/30/08
260,000 04/15/08
0
90
300 06 0275 / 5383
ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE
.0
10/01/04
06/30/05
0 10/01/04
06/30/05
2,675
100
210 10 0025 / 4565
E 71ST ST AND S DORCHESTER AVE
.0
03/01/03
12/31/04
0 06/11/02
06/25/04
4,059
100
210 06 / 32040
E MARQUETTE DR AND S RICHARDS DR
.0
09/02/06
10/27/06
6,000 09/02/06
10/27/06
0
100
300 06 0282 / 5390
S DREXEL AVE AND S SOUTH CHICAGO AVE
1.0
08/04/04
01/25/05
4,000 11/01/04
02/15/05
1,755
100
300 06 0292 / 5399
S DREXEL AVE AND S SOUTH CHICAGO AVE
.0
01/20/05
12/21/05
0 01/20/05
12/21/05
0
0
281 00 / 33670
1008-1010 E 59TH ST
.0
01/01/08
12/31/08
0
300 06 0292 / 5399
1532 E 76TH ST
1.0
06/06/05
07/19/05
Totals per Design/Engineering
6.0
2,000 05/13/05 272,000
07/19/05
0
0
0
100
8,489
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 60
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0005 / 5428
ON E 54TH ST FROM S COTTAGE GROVE AVE TO S DREXEL AVE
5.0
04/18/06
11/18/06
2,000 06/21/06
06/21/06
0
100
300 09 / 33071
ON E 61ST ST FROM S HARPER AVE TO S STONY ISLAND AVE
5.0
10/24/08
10/24/08
2,000 10/24/08
10/24/08
1,375
100
300 03 0005 / 4876
ON E 66TH PL FROM S STONY ISLAND AVE TO S BLACKSTONE AVE
9.0
06/18/04
06/21/04
3,500 06/11/04
06/15/04
1,742
100
302 00 0092 / 5774
ON E 67TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE
3.0
01/21/02
01/23/02
0 01/29/02
01/29/02
618
100
302 00 0092 / 5774
ON E 68TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE
3.0
01/21/02
01/23/02
0 01/29/02
01/29/02
618
100
300 03 0005 / 4876
ON E 68TH ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE
10.0
06/01/05
06/10/05
4,000 05/06/05
05/19/05
1,978
100
300 03 0005 / 4876
ON E 68TH ST FROM S HARPER AVE TO S DORCHESTER AVE
15.0
06/01/05
06/10/05
6,000 05/06/05
05/19/05
2,967
100
300 06 0069 / 5233
ON E 68TH ST FROM S STONY ISLAND AVE TO S EAST END AVE
4.0
0 04/12/02
04/12/02
1,500
100
302 00 0092 / 5774
ON E 69TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE
3.0
01/21/02
01/23/02
0 01/29/02
01/29/02
618
100
300 03 0005 / 4876
ON E 69TH ST FROM S CREGIER AVE TO S JEFFERY BLVD
10.0
06/01/05
06/10/05
4,000 05/06/05
05/19/05
1,978
100
300 07 0005 / 5428
ON E 69TH ST FROM S DORCHESTER AVE TO S DANTE AVE
3.0
04/18/06
11/18/06
1,200 06/21/06
06/21/06
0
100
302 00 0092 / 5774
ON E 70TH PL FROM S PAXTON AVE TO S OGLESBY AVE
2.0
01/21/02
01/23/02
0 01/29/02
01/29/02
412
100
300 03 0005 / 4876
ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR
5.0
06/01/04
06/21/04
1,875 06/11/04
06/15/04
968
100
302 00 0092 / 5774
ON E 70TH ST FROM S CHAPPEL AVE TO S OGLESBY AVE
3.0
01/21/02
01/23/02
0 01/29/02
01/29/02
618
100
300 03 0005 / 4876
ON E 70TH ST FROM S CRANDON AVE TO S SOUTH SHORE DR
6.0
06/18/04
06/21/04
2,250 06/11/04
06/15/04
1,161
100
300 03 0005 / 4876
ON E 70TH ST FROM S JEFFERY BLVD TO S SOUTH SHORE DR
10.0
06/01/05
06/10/05
4,000 05/06/05
05/19/05
1,978
100
300 06 0225 / 5340
ON E 70TH ST FROM S PAXTON AVE TO S CRANDON AVE
17.0
11/15/03
11/16/03
1,500 11/05/03
11/07/03
3,298
100
302 00 0092 / 5774
ON E 72ND ST FROM S JEFFERY BLVD TO S MERRILL AVE
8.0
05/09/03
05/09/03
3,200 05/06/03
05/06/03
3,000
100
300 06 0122 / 5275
ON E 73RD ST FROM S JEFFERY BLVD TO S MERRILL AVE
4.0
05/20/03
05/22/03
3,000 05/06/03
05/06/03
946
100
300 06 0225 / 5340
ON E 73RD ST FROM S UNIVERSITY AVE TO S BLACKSTONE AVE
17.0
11/15/03
11/17/03
6,375 11/05/03
11/07/03
3,298
100
300 03 0005 / 4876
ON S BENNETT AVE FROM E 72ND ST TO E 73RD ST
10.0
06/01/05
06/10/05
4,000 05/06/05
05/19/05
1,978
100
300 03 0005 / 4876
ON S BLACKSTONE AVE FROM E 67TH PL TO E 68TH ST
10.0
06/01/05
06/10/05
4,000 05/06/05
05/19/05
1,978
100
302 00 0092 / 5774
ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/28/02
01/28/02
4,120
100
302 00 0092 / 5774
ON S CHAPPEL AVE FROM E 71ST ST TO E 67TH ST
15.0
02/04/02
02/04/02
3,150 02/01/02
02/01/02
3,045
100
302 00 0092 / 5774
ON S CHAPPEL AVE FROM E 73RD ST TO E 75TH ST
10.0
05/09/03
05/09/03
4,000 05/06/03
05/06/03
3,750
100
302 00 0092 / 5774
ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/28/02
01/28/02
4,120
100
302 00 0092 / 5774
ON S CLYDE AVE FROM E 71ST ST TO E 67TH ST
16.0
02/04/02
02/04/02
3,360 02/01/02
02/01/02
3,248
100
300 05 0005 / 5120
ON S CORNELL AVE FROM E 53RD ST TO E 55TH ST
10.0
04/04/05
11/18/05
4,000 07/06/05
07/21/05
2,510
100
300 05 0005 / 5120
ON S CORNELL AVE FROM E 67TH ST TO E 69TH ST
10.0
04/04/05
11/18/05
4,000 07/06/05
07/21/05
2,510
100
300 09 / 33071
ON S CORNELL AVE FROM E 69TH ST TO E 71ST ST
6.0
05/13/08
05/16/08
2,400 05/13/08
05/16/08
1,534
100
300 03 0005 / 4876
ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST
5.0
06/01/05
06/10/05
2,000 05/06/05
05/19/05
989
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 61
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/28/02
01/28/02
4,120
100
302 00 0092 / 5774
ON S CRANDON AVE FROM E 71ST ST TO E 67TH ST
17.0
02/04/02
02/04/02
3,570 02/01/02
02/01/02
3,451
100
300 06 0069 / 5233
ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST
11.0
11/01/03
11/03/03
4,368 03/21/03
03/21/03
2,408
100
302 00 0092 / 5774
ON S CREGIER AVE FROM E 67TH ST TO E 69TH ST
9.0
03/24/03
03/24/03
3,600 03/21/03
03/21/03
3,375
100
300 06 0225 / 5340
ON S DANTE AVE FROM E 69TH ST TO E 68TH ST
4.0
11/15/03
11/15/03
1,500 11/05/03
11/07/03
776
100
300 05 0005 / 5120
ON S DORCHESTER AVE FROM E 75TH ST TO E 76TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
300 05 0005 / 5120
ON S DREXEL AVE FROM E 53RD ST TO E 55TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
300 03 0005 / 4876
ON S EUCLID AVE FROM E 71ST ST TO E 74TH ST
15.0
06/01/05
06/10/05
6,000 05/06/05
05/19/05
2,967
100
300 03 0005 / 4876
ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST
5.0
06/01/05
06/10/05
2,000 05/06/05
05/19/05
989
100
300 05 0005 / 5120
ON S GREENWOOD AVE FROM E 71ST ST TO E 72ND ST
5.0
04/04/05
11/18/05
2,200 07/06/05
07/21/05
1,255
100
300 03 0005 / 4876
ON S HARPER AVE FROM E 68TH ST TO E 71ST ST
15.0
06/01/05
06/10/05
6,000 05/06/05
05/19/05
2,967
100
300 05 0005 / 5120
ON S KENWOOD AVE FROM E 75TH ST TO E 76TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
300 05 0005 / 5120
ON S KENWOOD AVE FROM E MARQUETTE RD TO E 67TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
300 05 0005 / 5120
ON S KIMBARK AVE FROM E MARQUETTE RD TO E 67TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
302 00 0092 / 5774
ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/28/02
01/28/02
4,120
100
302 00 0092 / 5774
ON S MERRILL AVE FROM E 71ST ST TO E 67TH ST
16.0
02/04/02
02/04/02
3,360 02/01/02
02/01/02
3,248
100
300 05 0005 / 5120
ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
302 00 0092 / 5774
ON S MERRILL AVE FROM E 72ND ST TO E 73RD ST
4.0
05/09/03
05/09/03
1,600 05/06/03
05/06/03
1,500
100
300 05 0005 / 5120
ON S OGLESBY AVE FROM E 67TH ST TO E 69TH ST
10.0
04/04/05
11/18/05
4,000 07/06/05
07/21/05
2,510
100
300 07 0005 / 5428
ON S OGLESBY AVE FROM E 69TH ST TO E 70TH ST
4.0
04/18/06
11/18/06
1,600 06/21/06
06/21/06
0
100
300 03 0005 / 4876
ON S OGLESBY AVE FROM E 69TH ST TO E 72ND ST
9.0
06/18/04
06/21/04
3,375 06/11/04
06/15/04
1,742
100
302 00 0092 / 5774
ON S OGLESBY AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/30/02
01/30/02
4,120
100
302 00 0092 / 5774
ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST
20.0
01/21/02
01/23/02
0 01/30/02
01/30/02
4,120
100
302 00 0092 / 5774
ON S PAXTON AVE FROM E 71ST ST TO E 67TH ST
17.0
02/04/02
02/04/02
3,570 02/01/02
02/01/02
3,451
100
300 06 0069 / 5233
ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST
12.0
11/01/03
11/03/03
4,765 03/21/03
03/21/03
2,627
100
302 00 0092 / 5774
ON S RIDGELAND AVE FROM E 67TH ST TO E 69TH ST
10.0
03/24/03
03/24/03
4,000 03/21/03
03/21/03
3,750
100
300 05 0005 / 5120
ON S WOODLAWN AVE FROM E 71ST ST TO E 73RD ST
10.0
04/04/05
11/18/05
4,000 07/06/05
07/21/05
2,510
100
300 05 0005 / 5120
S KIMBARK AVE AND E 75TH ST
5.0
04/04/05
11/18/05
2,000 07/06/05
07/21/05
1,255
100
302 00 0092 / 5774
1600 E 68TH ST
4.0
04/15/02
04/15/02
840 04/12/02
04/12/02
840
100
Totals per 250 Watt Changeout
566.0
150,158
124,486
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 62
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 06 0225 / 5340
ON E 67TH PL FROM S BLACKSTONE AVE TO S STONY ISLAND AVE
16.0
11/15/03
11/16/03
6,400 11/05/03
11/07/03
3,104
100
300 09 / 33071
ON S SHORE DR FROM E 53RD ST TO E 56TH ST
14.0
06/23/08
06/27/08
5,600 09/04/08
09/12/08
4,410
100
300 09 / 33071
ON S STONY ISLAND AVE FROM E 61ST ST TO E 62ND ST
7.0
10/24/08
10/27/08
2,800 10/24/08
10/27/08
1,875
100
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
37.0
14,800
9,389
Installations
300 06 0096 / 5258
1900 E 71ST ST
1,611.0
03/01/03
09/01/03
42,079 03/01/06
09/01/06
48,675
0
805 06 0991 / 7177
1437 E 72ND PL
1.0
06/09/95
06/09/95
0 06/09/95
06/09/95
300
100
805 06 1858 / 8044
6907 S CRANDON AVE
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
805 06 1839 / 8025
6927 S CRANDON AVE
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
805 06 1820 / 8006
6949 S CRANDON AVE
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
805 06 1693 / 7879
6957 S CRANDON AVE
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
600
100
805 06 0415 / 6601
5216 S DREXEL AVE
1.0
05/23/95
05/23/95
0 05/23/95
05/23/95
300
100
805 06 2085 / 8271
5228 S DREXEL AVE
1.0
05/23/95
05/23/95
0 05/23/95
05/23/95
300
100
805 06 1994 / 8180
5232 S DREXEL AVE
1.0
05/23/95
05/23/95
0 05/23/95
05/23/95
300
100
805 06 1865 / 8051
5240 S DREXEL AVE
1.0
05/23/95
05/23/95
0 05/23/95
05/23/95
300
100
805 06 0552 / 6738
7251 S EUCLID AVE
1.0
05/09/95
05/09/95
0 05/09/95
05/09/95
300
100
805 06 2066 / 8252
5605 S KIMBARK AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 2068 / 8254
5631 S KIMBARK AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 2069 / 8255
5647 S KIMBARK AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 2070 / 8256
5700 S KIMBARK AVE
1.0
04/12/96
04/12/96
0 04/12/96
04/12/96
300
100
805 06 1835 / 8021
5317 S MARYLAND AVE
1.0
01/11/95
01/11/95
0 01/11/95
01/11/95
300
100
805 06 1742 / 7928
7500 S MERRILL AVE
1.0
05/16/97
05/16/97
0 05/16/97
05/16/97
300
100
805 06 0467 / 6653
7010 S WOODLAWN AVE
1.0
10/05/95
10/05/95
0 10/05/95
10/05/95
300
100
805 06 1002 / 7188
1140 W 75TH ST
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
1900 E 71ST ST
Totals per Lighting/Electrical
1,629.0
42,079
54,375
Lamps 2,175.0
06/01/07
12/31/07
64,032 11/06/07 1,248,972
11/14/07
62,096 1,451,027
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 63
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1900 E 71ST ST
Work Type: Flood Light Install
Installations 2,080.0
0 07/18/02
07/21/02
37,873
100
Fixtures
300 03 0005 / 4876
2132 E 72ND ST
4.0
09/01/04
09/04/04
2,000 09/01/04
09/01/04
1,600
100
300 03 0005 / 4876
6900 S DORCHESTER AVE
1.0
09/01/01
09/04/04
500 09/01/04
09/01/04
400
100
300 03 0005 / 4876
7401 S MERRILL AVE
1.0
09/01/04
09/04/04
500 09/01/04
09/01/04
400
100
300 03 0005 / 4876
7000 S OGLESBY AVE
1.0
09/01/04
09/04/04
500 09/01/04
09/01/04
400
100
300 03 0005 / 4876
7100 S OGLESBY AVE
1.0
09/01/04
09/04/04
500 09/01/04
09/01/04
400
100
300 06 0071 / 5234
7059 S SOUTH SHORE DR
01/01/00
12/30/00
0 09/11/00
09/13/00
6,750
100
300 09 / 33071
6230 S STONY ISLAND AVE
1.0
10/27/08
10/27/08
500 10/27/08
10/27/08
335
100
300 09 / 33071
6240 S STONY ISLAND AVE
1.0
10/27/08
10/27/08
500 10/27/08
10/27/08
335
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
10.0
.0
Work Type: Lighting Imprvmnts
Installations
01/01/08
12/31/08
300 06 0292 / 5399
S DREXEL AVE AND S SOUTH CHICAGO AVE
281 00 / 33670
1008-1010 E 59TH ST
.0
01/01/08
12/31/08
300 06 0292 / 5399
1532 E 76TH ST
.0
03/01/05
12/31/05
Work Type: Lighting Imprvmnts 300 06 0282 / 5390
S DREXEL AVE AND S SOUTH CHICAGO AVE
Work Type: Loop Lighting 281 00 / 33670
1008-1010 E 59TH ST
Work Type: Ornamental - Piggyback Lighting 300 09 / 33071
ON S SHORE DR FROM E 53RD ST TO E 56TH ST
Work Type: Ornamental Lighting 281 00 / 33670
1008-1010 E 59TH ST
10,620
0
0
0
30,133
100
Blocks
1008-1010 E 59TH ST
Totals per Lighting Imprvmnts
5,000
1.0
30,570 05/23/05
1.0
07/06/05
0 50,000 03/01/05
09/07/05
80,570
0
0
34,431
100
64,564
Projects .0
10/06/04
10/31/04
0 06/01/05
01/01/08
12/31/08
0
08/28/08
09/12/08
01/01/08
12/31/08
06/28/07
30,132
100
0
0
29,066
100
0
0
Blocks .0
Fixtures 32.0
43,800 09/04/08
09/12/08
Blocks .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 64
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670
1008-1010 E 59TH ST
Work Type: Residential Regrouping 300 06 0270 / 5378
1900 E 71ST ST
Work Type: Residntl Staggered Lighting
Poles .0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
05/04/08
12/31/08
0
0
0
135,000
0
0
Lamps .0
Blocks
300 06 / 32277
ON E 67TH ST FROM S JEFFERY BLVD TO S STONY ISLAND AVE
300 09 / 33071
ON E 70TH PL FROM S PAXTON AVE TO S SOUTH SHORE DR
2.0
300 11 / 32194
ON E 73RD ST FROM S DORCHESTER AVE TO S STONY ISLAND AVE
2.0
04/01/08
06/02/08
125,000 11/02/07
03/14/08
86,054
100
300 07 0004 / 5427
waiting for restoration Note Last Updated on 07-FEB-08 ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST
.50
07/17/06
09/08/06
21,250 09/01/06
11/27/06
0
100
300 07 0005 / 5428
ON S DREXEL AVE FROM E 53RD ST TO E 54TH ST
.50
04/01/07
06/01/07
21,250 09/01/06
11/27/06
0
100
300 09 / 33070
ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST
.50
32,500 04/01/08
12/01/08
0
0
300 09 / 33071
ON S ELLIS AVE FROM E 53RD ST TO E 54TH ST
.50
32,500
0
0
300 09 / 33071
ON S EVERETT AVE FROM E 55TH ST TO E 56TH ST
1.0
65,000
0
0
7.0
432,500
86,054
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
.0
Blocks
300 06 0267 / 5375
ON S DOBSON AVE FROM E 71ST ST TO E 73RD ST
2.0
06/20/04
08/20/04
155,485 05/19/04
09/16/04
139,095
100
300 06 0235 / 5349
ON S WOODLAWN AVE FROM E 71ST ST TO E 69TH ST
2.0
05/02/03
07/02/03
153,524 05/02/03
06/06/03
153,912
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
1008-1010 E 59TH ST
Work Type: Short Arm Installs - Residntl 281 00 / 33670
1008-1010 E 59TH ST
4.0
309,009
293,007
Locations .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
Locations .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 65
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 04 0216 / 5114
ON E 55TH ST FROM S ELLIS AVE TO S WOODLAWN AVE
14.50
05/01/06
11/01/06
3,100 05/17/06
09/09/06
3,100
100
300 06 0108 / 5263
ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE
70.0
05/11/03
05/31/03
17,000 07/01/03
07/28/03
16,870
100
300 06 0108 / 5263
ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST
79.0
05/20/03
06/03/03
18,500 07/01/03
07/28/03
18,480
100
300 09 / 33071
ON S SHORE DR FROM E 53RD ST TO E 56TH ST
14.0
06/23/08
06/27/08
4,200 06/23/08
06/27/08
2,800
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
1008-1010 E 59TH ST
Work Type: Strt Lighting 300 06 0275 / 5383
ON E 72ND ST FROM S STONY ISLAND AVE TO S CORNELL AVE
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
1900 E 71ST ST
177.50
42,800
41,250
0
0
0
Blocks .0
01/01/08
12/31/08
04/21/06
07/18/06
40,000 04/21/06
07/18/06
37,456
100
03/01/04
12/01/04
11,352 07/31/06
08/25/06
23,773
100
Blocks .50
Lamps 2,183.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 66
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2634 / 8820
1601 E 55TH ST
302 00 0071 / 5759
1540 E 56TH ST
805 06 2527 / 8713
1538 E 57TH BLVD
302 00 0071 / 5759
Fixtures 22.0
0 01/23/92
01/23/92
16,500
100
0 08/01/98
08/06/98
20,171
100
0 01/23/92
01/23/92
16,500
100
1530 E 57TH ST
0 08/09/98
08/12/98
21,965
100
302 00 0070 / 5758
1500 E 59TH ST
0 07/15/97
07/22/97
17,507
100
805 06 2157 / 8343
1500 E 59TH ST
38.0
07/22/97
07/22/97
0 07/22/97
07/22/97
28,500
100
805 06 2199 / 8385
1500 E 59TH ST
30.0
01/23/92
01/23/92
0 01/23/92
01/23/92
22,500
100
302 00 0070 / 5758
1500 E 60TH ST
0 08/20/97
08/27/97
14,520
100
805 06 2128 / 8314
1500 E 60TH ST
20.0
08/27/97
08/27/97
0 08/27/97
08/27/97
15,000
100
805 06 2833 / 9019
1405 E 67TH ST
20.0
04/13/93
04/13/93
0 04/13/93
04/13/93
15,000
100
805 06 2622 / 8808
1305 E 70TH ST
34.0
01/30/95
01/30/95
0 01/30/95
01/30/95
25,500
100
805 06 2418 / 8604
1285 E 71ST ST
26.0
04/20/94
04/20/94
0 04/20/94
04/20/94
19,500
100
300 06 0099 / 5260
1900 E 71ST ST
229.0
07/28/03
07/30/03
12,872 07/28/03
07/30/03
7,232
100
805 06 2477 / 8663
1205 E 72ND ST
16.0
01/11/94
01/11/94
0 01/11/94
01/11/94
12,000
100
805 06 2446 / 8632
1205 E 73RD ST
22.0
12/27/93
12/27/93
0 12/27/93
12/27/93
16,500
100
805 06 2345 / 8531
1199 E 75TH ST
8.0
05/16/96
05/16/96
0 05/16/96
05/16/96
6,000
100
805 06 2342 / 8528
1200 E 75TH ST
27.0
03/26/96
03/26/96
0 03/26/96
03/26/96
20,250
100
302 00 0070 / 5758
1230 E 76TH ST
0 02/03/97
02/10/97
16,940
100
302 00 0070 / 5758
1240 E 76TH ST
0 02/03/97
02/10/97
10,400
100
302 00 0070 / 5758
1250 E 76TH ST
0 01/17/97
01/23/97
10,100
100
805 06 2180 / 8366
1436 E MIDWAY PLAISANCE
0 12/31/95
12/31/95
9,000
100
302 00 0070 / 5758
1500 E MIDWAY PLAISANCE
0 07/21/97
07/28/97
6,460
100
805 06 2121 / 8307
1500 E MIDWAY PLAISANCE
20.0
07/28/97
07/28/97
0 07/28/97
07/28/97
15,000
100
805 06 2184 / 8370
1500 E MIDWAY PLAISANCE
12.0
12/31/95
12/31/95
0 12/31/95
12/31/95
9,000
100
302 00 0070 / 5758
1510 E MIDWAY PLAISANCE
0 07/31/97
08/11/97
15,626
100
805 06 2122 / 8308
1510 E MIDWAY PLAISANCE
28.0
08/11/97
08/11/97
0 08/11/97
08/11/97
21,000
100
805 06 2610 / 8796
7605 S AVALON AVE
26.0
12/31/91
12/31/91
0 12/31/91
12/31/91
19,500
100
805 06 2464 / 8650
7105 S COTTAGE GROVE AVE
22.0
01/24/96
01/24/96
0 01/24/96
01/24/96
16,500
100
805 06 2396 / 8582
7189 S COTTAGE GROVE AVE
18.0
01/24/96
01/24/96
0 01/24/96
01/24/96
13,500
100
302 00 0070 / 5758
7720 S DANTE AVE
0 01/22/97
01/29/97
7,503
100
302 00 0070 / 5758
7730 S DANTE AVE
0 01/22/97
01/28/97
1,164
100
22.0
12.0
01/23/92
01/23/92
12/31/95
01/23/92
01/23/92
12/31/95
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 67
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0070 / 5758
7740 S DANTE AVE
805 06 2114 / 8300
7340 S GREENWOOD AVE
302 00 0070 / 5758
7420 S GREENWOOD AVE
805 06 2115 / 8301
7420 S GREENWOOD AVE
302 00 0070 / 5758
Fixtures 0 01/28/97
02/04/97
4,506
100
0 09/01/97
09/01/97
7,500
100
0 10/13/97
10/20/97
4,290
100
0 10/20/97
10/20/97
6,750
100
7430 S GREENWOOD AVE
0 09/10/97
09/17/97
5,818
100
302 00 0070 / 5758
7440 S GREENWOOD AVE
0 09/07/97
09/12/97
15,184
100
805 06 2113 / 8299
7440 S GREENWOOD AVE
16.0
09/12/97
09/12/97
0 09/12/97
09/12/97
12,000
100
805 06 2232 / 8418
7500 S SOUTH CHICAGO AVE
32.0
12/09/96
12/09/96
0 12/09/96
12/09/96
24,000
100
Totals per Underpass Lighting
10.0
9.0
719.0
09/01/97
10/20/97
09/01/97
10/20/97
12,872
546,886
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 68
1/1/2008 AND 12/31/2008
Ward 05 Leslie Hairston CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 300 05 0005 / 5120
E 71ST ST AND S COTTAGE GROVE AVE
210 06 0171 / 4420
E MARQUETTE RD AND S STONY ISLAND AVE
210 06 0072 / 4336
6700 S STONY ISLAND AVE
Totals per Left Turn Arrow
Work Type: New Signal
Locations .50
10/15/06
12/15/06
30,000
.0
03/01/07
12/31/07
0
1.0
01/08/01
02/08/01
1.50
.0
01/28/07
07/28/07
210 06 0171 / 4420
E MARQUETTE RD AND S STONY ISLAND AVE
.0
03/01/07
12/31/07
300 06 0197 / 5322
.0
S LAKE PARK AVE AND E 55TH ST
Work Type: Signals 300 06 0096 / 5258
1900 E 71ST ST
Work Type: TSM Install
0
0
10,986
100
10,986
Locations
E MARQUETTE DR AND S RICHARDS DR
Work Type: Removal Temp Wiring - Signals
01/17/01
45,000
210 06 / 32040
Totals per New Signal
15,000 01/10/01
0
67,000 03/13/07
05/07/07
56,011
100
0
0
0
67,000
56,011
Crossings 1.50
6,000 04/08/02
04/08/02
0
100
9,329
100
100
Intersections 59.0
07/15/03
07/18/03
0 07/15/06
07/20/06
04/16/93
04/16/93
0 04/16/93
04/16/93
72,118
0 12/02/98
01/25/99
165,315
Locations
814 06 0137 / 16351
7500 S DORCHESTER AVE
1.0
271 00 0040 / 4789
7100 S JEFFERY AVE
1.0
814 06 0104 / 16319
7130 S JEFFERY BLVD
1.0
05/14/90
05/14/90
0 05/14/90
05/14/90
88,894
100
814 06 0133 / 16347
7300 S JEFFERY BLVD
1.0
02/10/94
02/10/94
0 02/10/94
02/10/94
109,097
100
814 06 0061 / 16277
5900 S STONY ISLAND AVE
1.0
02/23/96
02/23/96
0 02/23/96
02/23/96
318,966
100
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 09 / 33071
ON S SHORE DR FROM E 53RD ST TO E 56TH ST
Totals per Traffic
0
754,390
Locations 2.0
06/23/08
06/27/08
400 06/23/08
06/27/08
239
118,400
830,955
Totals per Construction Phase
1,367,372
2,281,982
Totals for Ward 05
1,639,372
2,290,471
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 69
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,266
100
210 06 0243 / 4480
E 83RD ST AND S COTTAGE GROVE AVE
.0
10/15/06
11/15/06
500 10/15/06
06/07/06
1,500
100
210 06 0243 / 4480
E 95TH ST AND S MICHIGAN AVE
.0
12/27/06
01/26/07
500 12/27/06
01/26/07
1,912
100
300 06 0292 / 5399
7636 S COTTAGE GROVE AVE
1.0
06/06/05
07/11/05
1,500 06/06/05
07/11/05
0
100
Totals per Design/Engineering
1.0
2,500
5,678
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 70
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST
21.0
0 09/26/01
09/26/01
4,322
100
302 00 0092 / 5774
ON S CHAMPLAIN AVE FROM E 71ST ST TO E 75TH ST
17.0
0 09/27/01
09/27/01
3,499
100
302 00 0092 / 5774
ON S ST LAWRENCE AVE FROM E 71ST ST TO E 75TH ST
17.0
0 09/26/01
09/26/01
3,499
100
300 06 0069 / 5233
8200 S COTTAGE GROVE AVE
300 06 / 32495
09/29/01
09/29/01
4.0
02/16/03
02/16/03
1,600 02/13/03
02/13/03
1,000
100
7600-7800 S INDIANA AVE
11.0
08/01/07
08/15/07
2,200 08/18/07
08/18/07
2,200
100
300 06 / 32495
7600-7800 S MICHIGAN AVE
11.0
04/01/07
05/15/07
2,200 08/18/07
08/18/07
2,200
100
302 00 0092 / 5774
8201 S WABASH AVE
1.0
02/03/01
02/03/01
203 01/31/01
01/31/01
210
100
302 00 0092 / 5774
8205 S WABASH AVE
1.0
02/03/01
02/03/01
203 01/31/01
01/31/01
210
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
83.0
6,406
17,140
Fixtures
300 09 / 33072
ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE
300 06 0122 / 5275
ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST
300 05 0006 / 5121
ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST
60.0
04/04/05
11/18/05
24,000 08/10/05
08/20/05
21,000
100
300 07 0006 / 5429
ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST
192.0
10/10/06
11/10/06
76,800 10/10/06
11/01/06
0
100
300 11 / 32195
8700-9900 S DR MARTIN LUTHER KING JR DR
105.0
12/01/07
12/31/07
43,000 09/26/07
02/14/08
26,031
100
300 05 0006 / 5121
Totals per 400 Watt Changeout Totals per Lighting/Electrical
46.0
04/04/05
11/18/05
18,400 08/10/05
08/20/05
16,100
100
63.0
05/12/08
07/11/08
25,200 05/12/08
05/23/08
19,845
100
6.0
05/09/03
05/09/03
2,400 05/06/03
05/06/03
2,250
100
472.0
189,800
85,226
1,547,479
1,333,025
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 71
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0983 / 7169
612 E 71ST ST
1.0
03/28/95
03/28/95
0 03/28/95
03/28/95
300
300 06 0096 / 5258
406 E 75TH ST
1,870.0
03/01/03
09/01/03
48,844 03/01/06
09/01/06
56,500
0
302 00 0092 / 5774
406 E 75TH ST
26.0
0 02/27/01
01/30/02
6,127
100
805 06 1011 / 7197
705 E 75TH ST
1.0
03/07/95
03/07/95
0 03/07/95
03/07/95
300
100
805 06 0866 / 7052
25 E 79TH ST
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
302 00 0092 / 5774
125 E 87TH ST
1.0
0 11/06/01
11/06/01
236
100
805 06 0756 / 6942
319 E 91ST ST
1.0
03/22/95
03/22/95
0 03/22/95
03/22/95
300
100
805 06 0757 / 6943
319 E 91ST ST
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
805 06 0758 / 6944
327 E 91ST ST
1.0
09/20/96
09/20/96
0 09/20/96
09/20/96
300
100
302 00 0092 / 5774
7536 S CALUMET AVE
1.0
0 03/02/01
03/02/01
236
100
805 06 0806 / 6992
8520 S CALUMET AVE
1.0
03/22/95
03/22/95
0 03/22/95
03/22/95
300
100
805 06 0808 / 6994
8520 S CALUMET AVE
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
805 06 0625 / 6811
7516 S EVANS AVE
1.0
03/07/95
03/07/95
0 03/07/95
03/07/95
300
100
805 06 0606 / 6792
7522 S EVANS AVE
1.0
03/07/95
03/07/95
0 03/07/95
03/07/95
300
100
805 06 1748 / 7934
7529 S EVANS AVE
1.0
05/21/97
05/21/97
0 05/21/97
05/21/97
300
100
805 06 1099 / 7285
6933 S GREEN ST
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 1746 / 7932
7445 S INDIANA AVE
1.0
05/21/97
05/21/97
0 05/21/97
05/21/97
300
100
805 06 1527 / 7713
7851 S INDIANA AVE
1.0
11/06/97
11/06/97
0 11/06/97
11/06/97
300
100
805 06 1625 / 7811
9416 S MICHIGAN AVE
1.0
09/12/97
09/12/97
0 09/12/97
09/12/97
300
100
805 06 0612 / 6798
6710 S PARNELL AVE
1.0
10/27/95
10/27/95
0 10/27/95
10/27/95
300
100
805 06 0613 / 6799
6740 S PARNELL AVE
1.0
10/27/95
10/27/95
0 10/27/95
10/27/95
300
100
805 06 0614 / 6800
6748 S PARNELL AVE
1.0
10/27/95
10/27/95
0 10/27/95
10/27/95
300
100
805 06 1684 / 7870
7030 S PERRY AVE
1.0
06/25/97
06/25/97
0 06/25/97
06/25/97
300
100
805 06 0554 / 6740
7042 S PERRY AVE
1.0
12/04/95
12/04/95
0 12/04/95
12/04/95
300
100
805 06 0551 / 6737
7102 S PRAIRIE AVE
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
805 06 0559 / 6745
7102 S PRAIRIE AVE
1.0
03/22/95
03/22/95
0 03/22/95
03/22/95
300
100
302 00 0092 / 5774
7158 S STATE ST
1.0
0 04/04/01
04/04/01
236
100
805 06 1794 / 7980
8237 S WABASH AVE
1.0
0 03/28/97
03/28/97
300
100
Totals per Alley Lighting/Lamps
1,922.0
03/28/97
03/28/97
48,844
70,235
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 72
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
406 E 75TH ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2,105.0
2,010.0
61,971 12/03/07
01/28/08
60,097
100
0 09/01/02
09/08/02
36,598
100
0 12/06/99
12/06/99
1,405
100
17,700
70
10,993
100
Fixtures
331 E 71ST ST
Work Type: Lighting Imprvmnts
12/31/07
Installations
406 E 75TH ST
Work Type: Flood Light Install 300 06 0167 / 5306
06/01/07
4.0
Installations
300 06 0256 / 5366
ON W 71ST ST FROM S PRINCETON AVE TO S WENTWORTH AVE
300 06 0292 / 5399
Traffic corner being redisgned; 08/22/07 Note Last Updated on 22-AUG-07 7636 S COTTAGE GROVE AVE
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
11.0
08/01/04
12/31/07
17,700 07/17/06
.0
09/30/05
10/30/05
14,306 09/29/05
11.0
11/29/05
32,006
28,693
Fixtures
300 09 / 33072
ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE
300 05 0006 / 5121
MATERIALS ORDERED Note Last Updated on 28-JUL-08 ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST
52.0
04/04/05
11/18/05
70,200 08/10/05
01/23/06
60,397
100
300 07 0006 / 5429
ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST
159.0
10/10/06
11/10/06
214,650 10/10/06
12/17/06
0
100
300 11 / 32195
8700-9900 S DR MARTIN LUTHER KING JR DR
93.0
12/01/07
12/31/07
125,500 09/26/07
02/14/08
88,143
100
300 05 0006 / 5121
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
406 E 75TH ST
Work Type: Residntl Staggered Lighting 300 06 0308 / 5414
ON E 90TH ST FROM S ST LAWRENCE AVE TO S COTTAGE GROVE AVE
34.0
04/04/05
11/18/05
45,900 08/10/05
01/19/06
36,226
100
56.0
06/30/08
07/31/08
75,600 08/11/08
09/02/08
56,016
100
394.0
531,850
240,782
0
0
0
115,994
100
Lamps .0
03/01/08
12/01/08
03/16/06
12/31/06
Blocks 2.0
165,753 06/05/06
08/07/06
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 73
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 06 0267 / 5375
ON S FOREST AVE FROM E 95TH ST TO E 96TH ST
2.0
10/01/04
12/30/04
154,373 09/17/04
01/07/05
151,823
100
300 06 0235 / 5349
ON S LANGLEY AVE FROM E 81ST ST TO E 79TH ST
2.0
07/25/03
09/25/03
169,794 07/22/03
10/20/03
178,233
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
7100 S STATE ST
Work Type: Strt Light Pole Painting
4.0
324,167
330,056
Locations 7.0
0 04/06/01
04/06/01
2,647
100
Locations 34.0
04/04/05
11/18/05
8,500 08/10/05
08/20/05
7,354
100
300 09 / 33072
ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE
63.0
05/12/08
07/11/08
18,900 05/02/08
05/12/08
12,600
100
300 04 0216 / 5114
ON E 95TH ST FROM S MICHIGAN AVE TO S STATE ST
14.0
05/01/06
11/01/06
3,028 05/17/06
06/04/06
3,028
100
300 05 0006 / 5121
ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST
52.0
04/04/05
11/18/05
13,000 08/10/05
08/20/05
9,517
100
300 07 0006 / 5429
ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST
172.0
07/17/06
09/30/06
43,000 07/01/06
07/24/06
43,000
100
302 00 0076 / 5764
ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE
2.46
06/27/98
06/30/98
0 06/27/98
06/30/98
42
100
300 11 / 32195
8700-9900 S DR MARTIN LUTHER KING JR DR
136.0
07/10/07
12/31/07
29,550 07/10/07
08/05/07
29,550
100
300 06 / 32495
7600-7800 S INDIANA AVE
11.0
04/01/07
05/15/07
1,200 03/30/07
04/03/07
1,200
100
300 06 / 32495
7600-7800 S MICHIGAN AVE
11.0
04/01/07
05/15/07
1,200 03/29/07
04/03/07
1,200
100
300 05 0006 / 5121
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
495.46
118,378
107,491
Blocks
300 06 0204 / 5327
ON E 74TH ST FROM S DR MARTIN LUTHER KING JR DR TO S STATE ST
18.0
10/02/01
10/02/01
3,780 09/27/01
09/27/01
3,780
100
300 06 0204 / 5327
ON S CHAMPLAIN AVE FROM E 71ST ST TO E 74TH ST
17.0
10/03/01
10/03/01
3,570 09/26/01
09/26/01
3,570
100
300 06 0204 / 5327
ON S ST LAWRENCE AVE FROM E 71ST ST TO E 74TH ST
17.0
10/06/01
10/06/01
3,570 09/27/01
09/27/01
3,520
100
300 06 0204 / 5327
7300 S MICHIGAN AVE
4.0
10/02/01
10/02/01
840 09/29/01
09/29/01
840
100
56.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
406 E 75TH ST
11,760
11,710
Lamps 2,918.0
03/01/04
12/01/04
15,174 07/31/06
08/17/06
31,777
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 74
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2341 / 8527
720 E 71ST ST
20.0
03/22/96
03/22/96
0 03/22/96
03/22/96
15,000
100
805 06 2233 / 8419
798 E 71ST ST
17.0
03/22/96
03/22/96
0 03/22/96
03/22/96
12,750
100
300 06 0099 / 5260
406 E 75TH ST
736.0
07/31/03
08/11/03
41,370 07/31/03
08/07/03
28,594
100
805 06 2266 / 8452
9101 S DR MARTIN LUTHER KING JR DR
34.0
08/30/96
08/30/96
0 08/30/96
08/30/96
25,500
100
805 06 2430 / 8616
9001 S INDIANA AVE
22.0
02/25/94
02/25/94
0 02/25/94
02/25/94
16,500
100
805 06 2431 / 8617
6895 S KEEFE AVE
17.0
01/08/96
01/08/96
0 01/08/96
01/08/96
12,750
100
805 06 2434 / 8620
6895 S KEEFE AVE
13.0
01/08/96
01/08/96
0 01/08/96
01/08/96
9,750
100
805 06 2432 / 8618
6905 S ST LAWRENCE AVE
14.0
04/14/94
04/14/94
0 04/14/94
04/14/94
10,500
100
805 06 2433 / 8619
6906 S ST LAWRENCE AVE
22.0
04/14/94
04/14/94
0 04/14/94
04/14/94
16,500
100
805 06 2240 / 8426
205 W 66TH ST
8.0
04/29/93
04/29/93
0 04/29/93
04/29/93
6,000
100
805 06 2602 / 8788
395 W 71ST ST
12.0
02/14/95
02/14/95
0 02/14/95
02/14/95
9,000
100
302 00 0070 / 5758
600 W 71ST ST
0 07/15/97
07/22/97
6,330
100
805 06 2322 / 8508
726 W 83RD ST
18.0
03/12/93
03/12/93
0 03/12/93
03/12/93
13,500
100
805 06 2947 / 9133
331 W 88TH ST
6.0
12/21/93
12/21/93
0 12/21/93
12/21/93
4,500
100
805 06 2343 / 8529
245 W MARQUETTE RD
8.0
05/04/93
05/04/93
0 05/04/93
05/04/93
6,000
100
Totals per Underpass Lighting
947.0
41,370
193,174
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 75
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S COTTAGE GROVE AVE AND E 85TH ST
.50
5,282 04/19/05
04/19/05
2,910
100
210 06 0130 / 4389
S COTTAGE GROVE AVE AND E 86TH ST
.50
0 10/04/02
10/04/02
925
100
210 06 0130 / 4389
S DR MARTIN LUTHER KING JR DR AND E 75TH ST
1.0
0 09/27/01
09/27/01
8,539
100
210 06 0130 / 4389
S INDIANA AVE AND E 69TH ST
.50
0 05/21/02
05/21/02
3,662
100
210 06 0130 / 4389
S SOUTH CHICAGO AVE AND S KEEFE AVE
.50
0 04/30/02
04/30/02
925
100
210 06 / 32276
W 75TH ST AND S STATE ST
16,768 05/01/08
05/31/08
13,106
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
.0
04/24/05
04/01/07
04/24/05
02/28/08
3.0
22,050
30,067
Locations
300 05 0005 / 5120
E 71ST ST AND S COTTAGE GROVE AVE
.50
10/15/06
12/15/06
30,000
0
300 06 / 32754
E 87TH ST AND S DR MARTIN LUTHER KING JR DR
1.0
11/01/08
01/31/09
47,000
0
77,000
0
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0164 / 4415
E 86TH ST AND S COTTAGE GROVE AVE
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
E 83RD ST AND S COTTAGE GROVE AVE
210 06 0243 / 4480
E 95TH ST AND S MICHIGAN AVE
Totals per Pedestrian Countdown Signal Install
1.50
Locations 08/15/02
10/01/02
86,635 08/15/02
10/09/02
78,583
100
.10
04/01/06
05/08/07
12,000 04/01/06
01/11/07
5,773
100
.0
03/15/06
05/08/07
12,000 01/15/07
02/15/07
5,661
100
.50
Locations
.10
Work Type: Removal Temp Wiring - Signals
Crossings
S ST LAWRENCE AVE AND E 75TH ST
1.0
300 06 0197 / 5322
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
406 E 75TH ST
0
24,000
11,434
4,000 05/02/01
05/21/01
8,428
100
0 07/20/06
10/02/06
8,222
100
Intersections 52.0
07/21/03
07/25/03
426,327
1,342,161
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 76
1/1/2008 AND 12/31/2008
Ward 06 Freddrenna Lyle CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0163 / 4414
E 87TH ST AND S COTTAGE GROVE AVE
.50
10/01/02
10/15/02
31,843 10/08/02
12/16/02
30,190
100
814 06 0176 / 16388
8100 S COTTAGE GROVE AVE
1.0
07/09/93
07/09/93
0 07/09/93
07/09/93
115,000
100
814 06 0174 / 16386
8200 S COTTAGE GROVE AVE
1.0
07/09/93
07/09/93
0 07/09/93
07/09/93
115,000
100
814 06 0175 / 16387
8300 S COTTAGE GROVE AVE
1.0
07/09/93
07/09/93
0 07/09/93
07/09/93
115,000
100
814 06 0311 / 16523
7100 S DR MARTIN LUTHER KING JR DR
1.0
01/02/89
01/02/89
0 01/02/89
01/02/89
84,162
100
814 06 0206 / 16418
8700 S DR MARTIN LUTHER KING JR DR
1.0
03/15/94
03/15/94
0 03/15/94
03/15/94
120,000
100
814 06 0062 / 16278
9700 S DR MARTIN LUTHER KING JR DR
1.0
06/07/96
06/07/96
0 06/07/96
06/07/96
108,744
100
210 06 0068 / 4332
9932 S DR MARTIN LUTHER KING JR DR
1.0
06/01/99
12/01/99
157,500 07/20/99
01/20/00
69,876
100
814 06 0208 / 16420
8700 S INDIANA AVE
1.0
03/15/94
03/15/94
0 03/15/94
03/15/94
120,000
100
814 06 0130 / 16344
7100 S LAFAYETTE AVE
1.0
04/01/93
04/01/93
0 04/01/93
04/01/93
91,815
100
814 06 0207 / 16419
8700 S ST LAWRENCE AVE
1.0
04/05/94
04/05/94
0 04/05/94
04/05/94
120,000
100
814 06 0156 / 16370
7100 S STATE ST
1.0
04/02/93
04/02/93
0 04/02/93
04/02/93
100,651
100
11.50
Totals per TSM Install
Work Type: Traffic Equipment Painting
189,343
Locations 12.0
04/04/05
11/18/05
300 09 / 33072
ON E 75TH ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE ON E 83RD ST FROM S STATE ST TO S COTTAGE GROVE AVE
2.0
05/12/08
300 05 0006 / 5121
ON S DR MARTIN LUTHER KING JR DR FROM E 69TH ST TO E 75TH ST
12.0
04/04/05
300 07 0006 / 5429
ON S DR MARTIN LUTHER KING JR DR FROM E 75TH ST TO E 87TH ST
44.0
07/17/06
300 05 0006 / 5121
1,190,438
70.0
4,200 08/10/05
08/20/05
6,489
100
07/11/08
400 05/02/08
11/18/05
4,200 08/10/05
05/12/08
239
100
08/20/05
4,903
09/30/06
14,500 07/01/06
100
07/24/06
3,359
100
23,300
14,990
Totals per Construction Phase
1,973,806
2,675,185
Totals for Ward 06
1,976,306
2,680,863
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 77
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
210 06 0158 / 5058
E 95TH ST AND S PAXTON AVE
.0
08/15/05
12/31/05
0 08/15/05
281 00 / 33670
2565-2567 E 72ND PL
.0
01/01/08
12/31/08
0
300 06 0292 / 5399
1847 E 95TH ST
1.0
06/29/05
300 06 0292 / 5399
7615 S MARQUETTE RD
1.0
300 06 0251 / 5361
9141 S SOUTH CHICAGO AVE
.0
04/01/07
12/31/05
1,000 06/29/05
08/08/07
2,326
100
0
0
0
1,000 03/30/05
05/09/05
0
100
420 09/25/07
09/25/07
0
100
10/31/06 email from CDOT to remodify existing . No further information on this project. Note Last Updated on 26-FEB-07 Totals per Design/Engineering
2.0
2,420
2,326
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 78
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 09 / 33076
ON S MUSKEGON AVE FROM E 87TH ST TO E 89TH ST
Work Type: 400 Watt Changeout
Fixtures 10.0
10/24/08
10/24/08
4,000 10/24/08
10/24/08
3,487
100
Fixtures
300 09 / 33073
ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
47.0
05/05/08
06/27/08
18,800 05/05/08
06/27/08
16,997
100
300 11 / 32196
ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
82.0
01/04/08
03/11/08
33,600 01/04/08
03/11/08
19,582
100
300 11 / 32196
7113-7900 S EXCHANGE AVE
100.0
03/01/07
12/31/07
0 09/11/07
09/25/07
0
0
300 06 0069 / 5233
9500 S JEFFERY AVE
9.0
10/14/02
10/14/02
3,600 10/11/02
10/11/02
3,375
100
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
238.0
56,000
39,954
Installations
300 06 0096 / 5258
2552 E 79TH ST
1,116.0
302 00 0092 / 5774
2552 E 79TH ST
11.0
0 03/01/06
09/01/06
33,719
0
0 03/23/01
01/10/02
2,592
100
805 06 1674 / 7860
9911 S CLYDE AVE
1.0
08/10/95
805 06 1575 / 7761
7859 S COLES AVE
1.0
03/13/95
08/10/95
0 08/10/95
08/10/95
300
100
03/13/95
0 03/13/95
03/13/95
300
805 06 1812 / 7998
7535 S CRANDON AVE
1.0
100
02/16/95
02/16/95
0 02/16/95
02/16/95
300
805 06 1903 / 8089
7816 S CRANDON AVE
100
1.0
07/31/96
07/31/96
0 07/31/96
07/31/96
300
805 06 0598 / 6784
100
7727 S EXCHANGE AVE
1.0
02/16/95
02/16/95
0 02/16/95
02/16/95
300
100
805 06 2045 / 8231
8418 S KINGSTON AVE
1.0
09/29/95
09/29/95
0 09/29/95
09/29/95
300
100
805 06 2046 / 8232
8439 S KINGSTON AVE
1.0
10/13/95
10/13/95
0 10/13/95
10/13/95
300
100
805 06 1515 / 7701
7622 S LUELLA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1486 / 7672
7640 S LUELLA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1855 / 8041
7700 S LUELLA AVE
1.0
06/12/96
06/12/96
0 06/12/96
06/12/96
300
100
805 06 1487 / 7673
7716 S LUELLA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1488 / 7674
7740 S LUELLA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 0571 / 6757
7935 S OGLESBY AVE
1.0
08/01/95
08/01/95
0 08/01/95
08/01/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
2552 E 79TH ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2552 E 79TH ST
03/01/03
09/01/03
1,140.0
0
40,211
Lamps 1,004.0
06/01/07
12/31/07
29,557 11/08/07
02/04/08
28,664
100
0 09/07/02
09/12/02
16,551
100
Installations 909.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 79
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
302 00 0092 / 5774
2629 E 91ST ST
1.0
0 07/03/01
07/03/01
471
100
302 00 0092 / 5774
2653 E 91ST ST
2.0
0 07/10/01
07/10/01
942
100
302 00 0092 / 5774
2705 E 91ST ST
1.0
0 07/10/01
07/10/01
471
100
302 00 0092 / 5774
2715 E 91ST ST
1.0
0 07/10/01
07/10/01
471
100
300 06 0167 / 5306
7400 S COLES AVE
1.0
0 05/25/99
05/25/99
351
100
6.0
0
2,706
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
Blocks
2565-2567 E 72ND PL
.0
Work Type: Lighting Imprvmnts
Installations
2565-2567 E 72ND PL
.0
281 00 / 33670
281 00 / 33670
Work Type: Loop Lighting 281 00 / 33670
2565-2567 E 72ND PL
Work Type: Ornamental - Piggyback Lighting
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
Blocks .0
Fixtures
300 09 / 33073
ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
47.0
07/07/08
07/25/08
64,050 07/07/08
07/25/08
57,551
100
300 11 / 32196
ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
71.0
01/04/08
03/11/08
95,850 01/04/08
03/11/08
81,295
100
300 11 / 32196
7113-7900 S EXCHANGE AVE
90.0
03/01/07
12/31/07
0 09/11/07
0
0
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 281 00 / 33670
2565-2567 E 72ND PL
Work Type: POD Camera Pole 281 00 / 33670
2565-2567 E 72ND PL
Work Type: Residential Regrouping 300 06 0270 / 5378
7129 S YATES BLVD
Totals per Lighting/Electrical
208.0
159,900
138,846
Blocks .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
1,828,759
1,825,474
Poles .0
Lamps .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 80
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0007 / 5430
ON S COLFAX AVE FROM E 75TH ST TO E 77TH ST
2.0
04/15/07
06/15/07
150,000 10/11/06
04/27/07
110,000
100
300 05 0007 / 5122
ON S ESSEX AVE FROM E 75TH ST TO E 77TH ST
2.0
11/01/05
04/01/06
170,000 09/20/05
11/11/05
96,164
100
300 07 0007 / 5430
ON S PHILLIPS AVE FROM E 75TH ST TO E 79TH ST
4.0
05/01/07
07/01/07
320,000 10/31/06
05/04/07
218,095
100
300 07 0007 / 5430
ON S SAGINAW AVE FROM S EXCHANGE AVE TO E 79TH ST
4.0
05/01/07
07/01/07
300,000 10/11/06
05/04/07
196,062
100
300 11 / 32196
7113-7900 S EXCHANGE AVE
.0
03/01/07
12/31/07
0
0
0
940,000
620,321
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
12.0
Blocks
300 03 0007 / 4878
ON S COLFAX AVE FROM E 77TH ST TO E 79TH ST
2.0
05/15/04
07/15/04
163,500 04/26/04
06/04/04
146,004
100
300 06 0267 / 5375
ON S ESSEX AVE FROM E 77TH ST TO E 79TH ST
2.0
03/15/04
05/15/04
162,741 03/05/04
05/03/04
155,686
100
300 06 0235 / 5349
ON S KINGSTON AVE FROM E 77TH ST TO E 79TH ST
2.0
05/20/03
07/20/03
152,935 05/06/03
07/16/03
144,540
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
2565-2567 E 72ND PL
302 00 0092 / 5774
8833 S MARQUETTE AVE
302 00 0092 / 5774
8843 S MARQUETTE AVE
Totals per Short Arm Installs - Arterial
Work Type: Short Arm Installs - Residntl 281 00 / 33670
2565-2567 E 72ND PL
302 00 0092 / 5774
8817 S MARQUETTE AVE
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
6.0
479,176
446,230
Locations 0
0
1.0
.0
01/01/08
12/31/08
0 0 02/13/01
02/13/01
378
100
1.0
0 02/13/01
02/13/01
378
100
2.0
0
756
Locations .0
01/01/08
12/31/08
0
1.0
0 02/13/01
1.0
0
02/13/01
0
0
378
100
378
Locations
300 09 / 33073
ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
50.0
05/05/08
06/27/08
12,500 05/05/08
05/23/08
10,000
100
300 11 / 32196
ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
71.0
01/04/08
03/11/08
15,620 01/04/08
03/11/08
14,200
100
300 06 0199 / 5324
ON S JEFFERY AVE FROM E 95TH ST TO E 96TH ST
24.0
09/20/02
10/01/02
10,384 10/31/02
11/01/02
1,901
100
300 09 / 33073
ON S KINGSTON AVE FROM E 85TH ST TO E 86TH ST
0
0
300 11 / 32196
7113-7900 S EXCHANGE AVE
0
0
Totals per Strt Light Pole Painting
4.0 100.0 249.0
800 03/01/07
12/31/07
0 08/10/07 39,304
08/18/07
26,101
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 81
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
2565-2567 E 72ND PL
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
2552 E 79TH ST
Work Type: Underpass Lighting
Blocks .0
01/01/08
12/31/08
0
03/01/04
12/01/04
4,295 07/31/06
0
0
08/22/06
8,995
100
Lamps 826.0
Fixtures
300 06 0099 / 5260
2552 E 79TH ST
552.0
08/12/03
08/19/03
31,027 08/08/03
08/15/03
23,163
100
805 06 2470 / 8656
2901 E 92ND ST
29.0
12/14/95
12/14/95
0 12/14/95
12/14/95
21,750
100
805 06 2471 / 8657
2901 E 92ND ST
17.0
12/14/95
12/14/95
0 12/14/95
12/14/95
12,750
100
805 06 2472 / 8658
2605 E 95TH ST
10.0
12/14/95
12/14/95
0 12/14/95
12/14/95
7,500
100
302 00 0070 / 5758
8920 S COLFAX AVE
0 06/11/97
06/18/97
10,041
100
302 00 0070 / 5758
8930 S COLFAX AVE
0 06/11/97
06/18/97
15,267
100
805 06 2136 / 8322
9340 S COLFAX AVE
0 08/28/97
08/28/97
73,500
100
302 00 0070 / 5758
9430 S COLFAX AVE
0 08/14/97
08/28/97
26,341
100
302 00 0070 / 5758
9230 S EXCHANGE AVE
0 07/01/97
07/08/97
7,824
100
805 06 2142 / 8328
9230 S EXCHANGE AVE
0 07/08/97
07/08/97
11,250
100
302 00 0070 / 5758
9240 S EXCHANGE AVE
0 06/17/97
06/24/97
12,751
100
805 06 2612 / 8798
9499 S JEFFERY AVE
70.0
11/03/94
11/03/94
0 11/03/94
11/03/94
52,500
100
805 06 2417 / 8603
8870 S KINGSTON AVE
23.0
10/31/95
10/31/95
0 10/31/95
10/31/95
17,250
100
805 06 2416 / 8602
8880 S KINGSTON AVE
23.0
10/31/95
10/31/95
0 10/31/95
10/31/95
17,250
100
302 00 0070 / 5758
8050 S MARQUETTE AVE
0 07/02/97
07/10/97
3,491
100
302 00 0070 / 5758
9100 S MARQUETTE AVE
0 07/02/97
07/08/97
14,396
100
805 06 2146 / 8332
9123 S MARQUETTE AVE
15.0
07/10/97
07/10/97
0 07/10/97
07/10/97
11,250
100
805 06 2172 / 8358
9123 S MARQUETTE AVE
15.0
07/08/97
07/08/97
0 07/08/97
07/08/97
11,250
100
805 06 2248 / 8434
9499 S PAXTON AVE
78.0
10/08/96
10/08/96
0 10/08/96
10/08/96
58,500
100
805 06 2166 / 8352
8885 S SOUTH CHICAGO AVE
37.0
06/18/97
06/18/97
0 06/18/97
06/18/97
27,750
100
805 06 2171 / 8357
8885 S SOUTH CHICAGO AVE
13.0
07/08/97
07/08/97
0 07/08/97
07/08/97
9,750
100
805 06 2217 / 8403
9551 S STONY ISLAND EXTENSION WEST
9.0
10/01/91
10/01/91
0 10/01/91
10/01/91
6,750
100
Totals per Underpass Lighting
98.0
15.0
1,004.0
08/28/97
07/08/97
08/28/97
07/08/97
31,027
452,274
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 82
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Locations
300 09 / 33073
E 94TH ST AND S PAXTON AVE
1.0
44,500
0
0
300 09 / 33073
E 95TH ST AND S MANISTEE AVE
1.0
41,000
0
0
2.0
85,500
0
Totals per Underpass Lighting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 83
1/1/2008 AND 12/31/2008
Ward 07 Sandi Jackson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0251 / 5361
9141 S SOUTH CHICAGO AVE
Work Type: LED Signal Head Install
Locations .0
08/01/07
10/01/07
33,580 07/02/07
08/15/07
34,879
100
Locations
210 06 0130 / 4389
S JEFFERY AVE AND E 95TH ST
.50
0 10/30/02
10/30/02
925
100
210 06 0130 / 4389
S SOUTH SHORE DR AND E 75TH ST
1.0
0 11/19/01
11/19/01
8,539
100
210 06 0130 / 4389
S SOUTH SHORE DR AND E 83RD ST
.50
0 10/23/01
10/23/01
4,270
100
2.0
0
Totals per LED Signal Head Install
Work Type: Signals 300 06 0096 / 5258
2552 E 79TH ST
Work Type: TSM Install
13,734
Intersections 13.0
07/18/03
07/24/03
0 07/16/06
10/21/06
2,056
100
Locations
210 06 0148 / 4400
E 75TH ST AND S YATES BLVD
1.0
09/01/03
11/01/03
200,000 08/15/03
10/17/03
120,661
100
210 06 0158 / 5058
E 95TH ST AND S PAXTON AVE
1.0
07/31/06
09/30/07
171,896 09/21/06
12/21/06
0
100
814 06 0060 / 16276
No finance info given in jcs Note Last Updated on 30-JAN-08 8300 S COLFAX AVE
1.0
11/09/95
11/09/95
0 11/09/95
11/09/95
125,000
100
814 06 0395 / 16582
8700 S COLFAX AVE
1.0
02/29/96
02/29/96
0 02/29/96
02/29/96
125,000
100
814 06 0371 / 16561
9299 S COLFAX AVE
1.0
05/23/96
05/23/96
0 05/23/96
05/23/96
129,704
100
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
371,896
500,365
Locations
300 09 / 33073
ON E 75TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
3.0
05/05/08
06/27/08
600 05/05/08
05/23/08
252
100
300 11 / 32196
ON E 79TH ST FROM S PAXTON AVE TO S SOUTH SHORE DR
17.0
01/04/08
03/11/08
4,400 01/04/08
03/11/08
3,400
100
300 11 / 32196
7113-7900 S EXCHANGE AVE
.0
03/01/07
12/31/07
0
0
0
5,000
3,652
410,476
554,686
Totals per Construction Phase
2,239,235
2,380,160
Totals for Ward 07
2,241,655
2,382,486
Totals per Traffic Equipment Painting Totals per Traffic
20.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 84
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON S AVALON AVE FROM E 77TH ST TO E 78TH ST
.0
04/01/08
08/30/08
0
0
0
300 06 0275 / 5383
ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST
.0
10/01/04
06/30/05
0 10/01/04
06/30/05
2,492
100
300 06 0308 / 5414
ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,046
100
300 06 / 32277
ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST
.0
04/01/08
08/30/08
0
0
0
300 06 / 32277
ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST
.0
04/01/08
08/30/08
0
0
0
210 06 0243 / 4480
E 79TH ST AND S CREGIER AVE
.0
01/08/07
01/26/07
1,275
100
281 00 / 33670
8108 S STONY ISLAND AVE
.0
01/01/08
12/31/08
0
0
0
500
5,813
Totals per Design/Engineering
.0
500 01/08/07
01/26/07
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 85
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0122 / 5275
ON E 93RD ST FROM S COTTAGE GROVE AVE TO S KIMBARK AVE
8.0
11/01/03
11/02/03
3,200 11/07/03
11/10/03
5,501
100
300 11 / 32197
ON S AVALON AVE FROM E 77TH ST TO E 78TH ST
5.0
08/01/07
08/10/07
2,200 08/18/07
08/18/07
2,200
100
300 07 0008 / 5431
ON S AVALON AVE FROM E 91ST ST TO E 92ND ST
5.0
01/19/07
01/31/07
2,100 01/19/07
01/31/07
2,100
100
300 03 0005 / 4876
ON S CORNELL AVE FROM E 71ST ST TO E 72ND ST
5.0
06/01/05
06/10/05
2,000 05/06/05
05/19/05
989
100
300 11 / 32197
ON S EUCLID AVE FROM E 80TH ST TO E 81ST ST
5.0
08/01/07
08/10/07
2,200 08/17/07
08/17/07
2,200
100
300 07 0008 / 5431
ON S LUELLA AVE FROM E 81ST ST TO E 82ND ST
5.0
01/19/07
01/31/07
2,100 01/19/07
01/31/07
2,100
100
300 06 0069 / 5233
1000 E 80TH ST
2.0
05/25/02
05/25/02
406 05/22/02
05/22/02
420
100
302 00 0092 / 5774
1000 E 90TH ST
4.0
02/09/03
02/09/03
840 02/06/03
02/06/03
840
100
300 06 0069 / 5233
1500 E 93RD ST
4.0
10/18/02
10/18/02
840 10/15/02
10/15/02
812
100
300 06 0069 / 5233
8200 S CLYDE AVE
4.0
10/18/02
10/18/02
840 10/15/02
10/15/02
812
100
300 03 0008 / 4879
8700 S CLYDE AVE
5.0
12/01/04
12/30/04
2,075 05/18/05
05/18/05
1,174
100
300 06 0069 / 5233
9200 S CLYDE AVE
5.0
02/16/03
02/16/03
2,000 02/13/03
02/13/03
3,086
100
302 00 0092 / 5774
7200 S CONSTANCE AVE
5.0
04/15/02
04/15/02
1,050 04/12/02
04/12/02
0
100
300 06 0069 / 5233
7200-7299 S CONSTANCE AVE
5.0
0 04/12/02
04/12/02
1,875
100
300 06 0069 / 5233
8800 S CORNELL AVE
4.0
1,500 09/12/02
09/12/02
1,318
100
300 06 0069 / 5233
8900 S CORNELL AVE
3.0
03/12/03
03/14/03
1,125 03/12/03
03/12/03
663
100
302 00 0092 / 5774
8501-8505 S CREGIER AVE
2.0
10/02/01
10/02/01
412 09/29/01
09/29/01
412
100
300 06 0122 / 5275
9200 S DOBSON AVE
5.0
11/01/03
11/01/03
1,975 11/10/03
11/10/03
1,191
100
300 06 0069 / 5233
8200 S DREXEL AVE
4.0
02/16/03
02/16/03
1,600 02/13/03
02/13/03
1,000
100
300 06 0122 / 5275
8300 S DREXEL AVE
5.0
11/01/03
11/01/03
1,975 11/10/03
11/10/03
1,191
100
300 06 0069 / 5233
8200 S ELLIS AVE
4.0
02/16/03
02/16/03
1,600 02/13/03
02/13/03
1,000
100
300 03 0008 / 4879
8600 S EUCLID AVE
5.0
08/01/04
08/05/04
2,075 07/07/04
07/07/04
1,194
100
300 09 / 33074
8700-8800 S EUCLID AVE
5.0
02/01/08
12/31/08
2,000 08/04/08
08/05/08
1,230
100
300 03 0008 / 4879
MATERIAL ORDERED Note Last Updated on 28-JUL-08 7600 S INGLESIDE AVE
4.0
08/01/04
08/05/04
1,700 07/07/04
07/07/04
1,311
100
300 06 0069 / 5233
8200 S INGLESIDE AVE
4.0
02/16/03
02/16/03
1,600 02/13/03
02/13/03
1,000
100
300 06 0069 / 5233
8200 S MARYLAND AVE
4.0
02/16/03
02/16/03
1,600 02/13/03
02/13/03
1,000
100
300 03 0008 / 4879
7900 S MERRILL AVE
5.0
08/01/04
08/05/04
2,075 07/07/04
07/07/04
1,194
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
121.0
43,088
37,813
1,235,551
1,606,085
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 86
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 05 0008 / 5123
ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE
300 06 0122 / 5275
ON S COTTAGE GROVE AVE FROM E 86TH ST TO E 87TH ST
Totals per 400 Watt Changeout
Fixtures 13.0
04/04/05
11/18/05
5,400 08/01/05
08/05/05
4,550
100
6.0
05/09/03
05/09/03
2,400 05/06/03
05/06/03
2,250
100
19.0
7,800
6,800
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 87
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1017 / 7203
1619 E 73RD ST
1.0
07/14/95
07/14/95
0 07/14/95
07/14/95
300
100
805 06 1621 / 7807
1061 E 80TH ST
1.0
09/11/97
09/11/97
0 09/11/97
09/11/97
300
100
805 06 0862 / 7048
1140 E 81ST ST
1.0
01/27/95
01/27/95
0 01/27/95
01/27/95
300
100
805 06 0751 / 6937
1503 E 85TH ST
1.0
07/21/95
07/21/95
0 07/21/95
07/21/95
300
100
805 06 0754 / 6940
1329 E 89TH ST
1.0
12/01/95
12/01/95
0 12/01/95
12/01/95
300
100
805 06 0755 / 6941
1333 E 89TH ST
1.0
11/28/95
11/28/95
0 11/28/95
11/28/95
300
100
300 06 0069 / 5233
1400 E 89TH ST
2.0
03/12/03
03/14/03
700 03/12/03
03/12/03
442
100
805 06 0759 / 6945
1101 E 93RD ST
1.0
10/13/95
10/13/95
0 10/13/95
10/13/95
300
100
805 06 0760 / 6946
1104 E 93RD ST
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
805 06 0762 / 6948
1125 E 93RD ST
1.0
10/13/95
10/13/95
0 10/13/95
10/13/95
300
100
805 06 0791 / 6977
1019 E 95TH ST
1.0
09/20/96
09/20/96
0 09/20/96
09/20/96
300
100
805 06 0867 / 7053
9526 S AVALON AVE
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
805 06 0868 / 7054
9536 S AVALON AVE
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
805 06 0823 / 7009
8718 S BLACKSTONE AVE
1.0
06/14/95
06/14/95
0 06/14/95
06/14/95
300
100
805 06 2002 / 8188
8222 S CHAPPEL AVE
1.0
06/19/95
06/19/95
0 06/19/95
06/19/95
300
100
805 06 1983 / 8169
8240 S CHAPPEL AVE
1.0
10/30/95
10/30/95
0 10/30/95
10/30/95
300
100
300 06 0139 / 5289
8539 S COTTAGE GROVE AVE
2,007.0
03/01/06
09/01/06
47,645 07/01/06
08/04/06
60,640
100
302 00 0092 / 5774
75& complete as of 07/26/06 Note Last Updated on 26-JUL-06 8539 S COTTAGE GROVE AVE
0 02/28/01
01/11/02
4,006
100
805 06 1623 / 7809
8826 S DORCHESTER AVE
1.0
09/11/97
09/11/97
0 09/11/97
09/11/97
300
100
805 06 1765 / 7951
9338 S EAST END AVE
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 1374 / 7560
7659 S JEFFERY BLVD
1.0
04/13/95
04/13/95
0 04/13/95
04/13/95
300
100
805 06 1662 / 7848
7736 S JEFFERY BLVD
1.0
08/05/97
08/05/97
0 08/05/97
08/05/97
300
100
805 06 1856 / 8042
8335 S LUELLA AVE
1.0
06/22/95
06/22/95
0 06/22/95
06/22/95
300
100
805 06 1857 / 8043
8738 S LUELLA AVE
1.0
12/12/95
12/12/95
0 12/12/95
12/12/95
300
100
805 06 1622 / 7808
7809 S MERRILL AVE
1.0
09/11/97
09/11/97
0 09/11/97
09/11/97
300
100
805 06 1823 / 8009
8114 S MERRILL AVE
1.0
02/20/97
02/20/97
0 02/20/97
02/20/97
300
100
805 06 0572 / 6758
8136 S OGLESBY AVE
1.0
05/30/96
05/30/96
0 05/30/96
05/30/96
300
100
805 06 0573 / 6759
8222 S OGLESBY AVE
1.0
08/29/95
08/29/95
0 08/29/95
08/29/95
300
100
805 06 0547 / 6733
7600 S PAXTON AVE
1.0
06/12/96
06/12/96
0 06/12/96
06/12/96
300
100
302 00 0092 / 5774
7901 S STONY ISLAND AVE
1.0
0 09/21/01
09/21/01
236
100
17.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 88
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 0405 / 6591
9755 S UNIVERSITY AVE
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
8539 S COTTAGE GROVE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
8539 S COTTAGE GROVE AVE
Work Type: Flood Light Install 302 00 0092 / 5774
1112 E 81ST PL
Work Type: Lighting Imprvmnts 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: Lighting Imprvmnts 300 06 0122 / 5275
1419 E 89TH ST
281 00 / 33670
8108 S STONY ISLAND AVE
Totals per Lighting Imprvmnts
Work Type: Loop Lighting 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: Ornamental - Piggyback Lighting 300 05 0008 / 5123
ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE
Work Type: Ornamental Lighting 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: POD Camera Pole 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
8539 S COTTAGE GROVE AVE
Installations 1.0
10/23/96
10/23/96
2,054.0
0 10/23/96
10/23/96
48,345
300
100
73,424
Lamps 1,750.0
06/01/07
12/31/07
51,520 11/15/07
01/05/08
49,962
100
0 08/15/02
08/27/02
29,534
100
0 03/16/01
03/16/01
471
100
0
0
Installations 1,622.0
Fixtures 1.0
Blocks .0
01/01/08
12/31/08
5.0
06/01/03
06/02/03
.0
01/01/08
12/31/08
0
Installations
5.0
5,000 06/06/03
2,960
100
0
06/09/03
0
0
5,000
2,960
0
0
0
22,920
100
Blocks .0
01/01/08
12/31/08
04/04/05
11/18/05
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Fixtures 1.0
16,200 08/01/05
08/05/05
Blocks .0
Poles .0
Lamps .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 89
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 11 / 32197
ON E 87TH PL FROM S COTTAGE GROVE AVE TO S DAUPHIN AVE
1.50
05/31/07
08/03/07
300 06 / 32277
ON S AVALON AVE FROM E 77TH ST TO E 78TH ST
.0
05/04/08
12/31/08
300 11 / 32197
ON S DOBSON AVE FROM E 98TH ST TO E 99TH ST
1.0
06/18/07
07/27/07
300 11 / 32197
ON S DREXEL AVE FROM E 81ST ST TO E 82ND ST
1.0
08/15/07
300 11 / 32197
ON S ELLIS AVE FROM E 91ST ST TO E 93RD ST
2.0
06/18/07
300 06 0308 / 5414
ON S INGLESIDE AVE FROM E 78TH ST TO E 80TH ST
2.0
300 06 / 32277
ON S KIMBARK AVE FROM E 78TH ST TO E 79TH ST
300 06 / 32277
ON S WOODLAWN AVE FROM E 78TH ST TO E 79TH ST
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375
ON S DOBSON AVE FROM E 79TH ST TO E 81ST ST
Work Type: Short Arm Installs - Arterial 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
9004 S DAUPHIN AVE
281 00 / 33670
8108 S STONY ISLAND AVE
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
75,000 05/31/07
08/10/07
0
59,977
100
0
0
80,000 06/13/07
09/21/07
55,303
100
10/22/07
80,000 08/15/07
09/28/07
31,966
100
08/03/07
150,000 06/11/07
08/31/07
96,984
100
03/16/06
12/31/06
177,798 10/04/06
05/07/07
131,870
100
.0
05/04/08
12/31/08
0
0
0
.0
05/04/08
12/31/08
0
0
0
562,798
376,100
7.50
Blocks 2.0
09/15/04
11/15/04
01/01/08
12/31/08
01/01/08
12/31/08
140,663 08/11/04
10/04/04
135,926
100
0
0
Locations .0
0
Locations 1.0 .0
0 05/24/01
1.0
378
100
0
05/24/01
0
0
0
378
Locations
300 05 0008 / 5123
ON E 79TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE
12.0
04/04/05
11/18/05
3,000 09/01/05
10/20/05
2,812
100
302 00 0076 / 5764
ON E 83RD ST FROM S COTTAGE GROVE AVE TO S STONY ISLAND AVE
61.0
06/23/98
06/26/98
0 06/23/98
06/26/98
1,037
100
300 04 0216 / 5114
ON E 87TH ST FROM S COTTAGE GROVE AVE TO S INGLESIDE AVE
15.0
05/01/06
11/01/06
3,172 05/17/06
06/02/06
3,172
100
302 00 0077 / 5765
ON S DORCHESTER AVE FROM E 87TH ST TO E 88TH ST
6.0
0 07/16/99
07/16/99
524
100
302 00 0076 / 5764
7900 S JEFFERY AVE
8.0
08/01/98
08/01/98
0 08/01/98
08/01/98
136
100
302 00 0076 / 5764
8600 S JEFFERY AVE
9.0
08/02/98
08/02/98
0 08/02/98
08/02/98
153
100
302 00 0076 / 5764
8700 S STONY ISLAND AVE
17.0
07/19/98
07/20/98
0 07/19/98
07/20/98
289
100
Totals per Strt Light Pole Painting
128.0
6,172
8,123
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 90
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
8108 S STONY ISLAND AVE
Work Type: Strt Lighting
Blocks .0
01/01/08
12/31/08
0
0
0
Blocks
300 06 0247 / 5357
ON E 87TH PL FROM S CORNELL AVE TO S RIDGELAND AVE
1.50
09/15/03
11/30/03
109,000 09/09/03
11/07/03
108,367
100
300 03 0008 / 4879
ON E 87TH ST FROM S STONY ISLAND AVE TO S CREGIER AVE
2.0
07/15/04
09/15/04
162,800 07/19/04
09/15/04
142,865
100
300 06 0275 / 5383
ON S CREGIER AVE FROM E 92ND PL TO E 93RD ST
.50
40,000 08/22/05
01/10/06
66,342
100
4.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
8539 S COTTAGE GROVE AVE
311,800
317,574
Lamps 1,645.0
03/01/04
12/01/04
8,554 07/31/06
08/22/06
17,914
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 91
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2607 / 8793
1160 E 76TH ST
42.0
02/27/95
02/27/95
0 02/27/95
02/27/95
31,500
100
805 06 2608 / 8794
1165 E 76TH ST
10.0
02/27/95
02/27/95
0 02/27/95
02/27/95
7,500
100
805 06 2337 / 8523
1195 E 79TH ST
30.0
08/07/93
08/07/93
0 08/07/93
08/07/93
22,500
100
805 06 2352 / 8538
1045 E 82ND ST
10.0
08/30/93
08/30/93
0 08/30/93
08/30/93
7,500
100
805 06 2604 / 8790
1045 E 82ND ST
27.0
08/30/93
08/30/93
0 08/30/93
08/30/93
20,250
100
805 06 2316 / 8502
1005 E 83RD ST
8.0
08/03/93
08/03/93
0 08/03/93
08/03/93
6,000
100
805 06 2331 / 8517
1005 E 83RD ST
10.0
08/03/93
08/03/93
0 08/03/93
08/03/93
7,500
100
805 06 2336 / 8522
1005 E 83RD ST
16.0
08/03/93
08/03/93
0 08/03/93
08/03/93
12,000
100
805 06 2492 / 8678
2110 E 85TH ST
13.0
12/08/95
12/08/95
0 12/08/95
12/08/95
9,750
100
805 06 2467 / 8653
2200 E 85TH ST
13.0
12/08/95
12/08/95
0 12/08/95
12/08/95
9,750
100
805 06 2367 / 8553
2220 E 86TH ST
12.0
02/15/94
02/15/94
0 02/15/94
02/15/94
9,000
100
805 06 2382 / 8568
2220 E 86TH ST
12.0
02/15/94
02/15/94
0 02/15/94
02/15/94
9,000
100
805 06 2324 / 8510
945 E 87TH ST
41.0
05/13/96
05/13/96
0 05/13/96
05/13/96
30,750
100
805 06 2373 / 8559
1290 E 87TH ST
10.0
10/18/95
10/18/95
0 10/18/95
10/18/95
7,500
100
805 06 2427 / 8613
845 E 91ST ST
10.0
08/03/93
08/03/93
0 08/03/93
08/03/93
7,500
100
805 06 2958 / 9144
835 E 93RD ST
26.0
08/02/93
08/02/93
0 08/02/93
08/02/93
19,500
100
302 00 0070 / 5758
830 E 95TH ST
0 06/12/97
06/19/97
18,592
100
805 06 2462 / 8648
1235 E 95TH ST
10.0
08/11/93
08/11/93
0 08/11/93
08/11/93
7,500
100
805 06 2615 / 8801
1495 E 95TH ST
30.0
12/20/94
12/20/94
0 12/20/94
12/20/94
22,500
100
300 06 0099 / 5260
8539 S COTTAGE GROVE AVE
598.0
08/20/03
08/27/03
33,611 08/18/03
08/25/03
24,521
100
805 06 2465 / 8651
9495 S COTTAGE GROVE AVE
28.0
11/07/95
11/07/95
0 11/07/95
11/07/95
21,000
100
805 06 2401 / 8587
7998 S EAST END AVE
11.0
10/07/93
10/07/93
0 10/07/93
10/07/93
8,250
100
805 06 2415 / 8601
7998 S EAST END AVE
9.0
10/05/93
10/05/93
0 10/05/93
10/05/93
6,750
100
805 06 2274 / 8460
7499 S GREENWOOD AVE
6.0
12/31/95
12/31/95
0 12/31/95
12/31/95
4,500
100
805 06 2635 / 8821
8301 S JEFFERY BLVD
17.0
11/01/94
11/01/94
0 11/01/94
11/01/94
12,750
100
805 06 2636 / 8822
8301 S JEFFERY BLVD
21.0
11/01/94
11/01/94
0 11/01/94
11/01/94
15,750
100
805 06 2617 / 8803
7901 S STONY ISLAND AVE
25.0
11/16/94
11/16/94
0 11/16/94
11/16/94
18,750
100
302 00 0072 / 5760
7940 S STONY ISLAND AVE
1.0
0 03/20/00
04/26/00
10,208
100
302 00 0072 / 5760
7950 S STONY ISLAND AVE
1.0
0 03/20/00
04/26/00
10,208
100
302 00 0072 / 5760
9440 S STONY ISLAND AVE
1.0
0 03/02/00
03/17/00
17,156
100
805 06 2637 / 8823
9499 S STONY ISLAND AVE
20.0
0 10/01/91
10/01/91
15,000
100
10/01/91
10/01/91
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 92
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2262 / 8448
9500 S STONY ISLAND EXTENSION WEST
10.0
12/31/96
12/31/96
0 12/31/96
12/31/96
7,500
100
805 06 2298 / 8484
9500 S STONY ISLAND EXTENSION WEST
6.0
12/31/96
12/31/96
0 12/31/96
12/31/96
4,500
100
805 06 2102 / 8288
9340 S WOODLAWN AVE
42.0
07/31/97
07/31/97
0 07/31/97
07/31/97
31,500
100
302 00 0070 / 5758
9490 S WOODLAWN AVE
0 07/24/97
07/31/97
12,751
100
805 06 2323 / 8509
837 W 87TH ST
24.0
06/05/96
06/05/96
0 06/05/96
06/05/96
18,000
100
805 06 2941 / 9127
865 W 88TH ST
16.0
12/10/93
12/10/93
0 12/10/93
12/10/93
12,000
100
805 06 2943 / 9129
905 W 89TH ST
12.0
12/08/93
12/08/93
0 12/08/93
12/08/93
9,000
100
Totals per Underpass Lighting
1,178.0
33,611
526,186
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 93
1/1/2008 AND 12/31/2008
Ward 08 Michelle Harris CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S COTTAGE GROVE AVE AND E 85TH ST
.50
5,282 04/19/05
04/19/05
2,910
100
210 06 0130 / 4389
S COTTAGE GROVE AVE AND E 86TH ST
.50
0 10/04/02
10/04/02
925
100
210 06 0130 / 4389
S JEFFERY AVE AND E 95TH ST
.50
0 10/30/02
10/30/02
925
100
210 06 0130 / 4389
S WOODLAWN AVE AND E 83RD ST
1.0
0 07/12/02
07/12/02
6,867
100
Totals per LED Signal Head Install
Work Type: New Signal
04/24/05
04/24/05
2.50
5,282
11,627
Locations
210 06 0190 / 4435
E 79TH ST AND S CREGIER AVE
1.0
10/15/04
01/31/05
190,000 09/08/04
02/10/05
148,195
100
210 06 0164 / 4415
E 86TH ST AND S COTTAGE GROVE AVE
.50
08/15/02
10/01/02
86,635 08/15/02
10/09/02
78,583
100
1.50
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
E 79TH ST AND S CREGIER AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
S DORCHESTER AVE AND E 83RD ST
Work Type: Signals 300 06 0096 / 5258
8539 S COTTAGE GROVE AVE
Work Type: TSM Install
276,635
226,778
Locations .0
03/03/06
05/08/07
12,000 03/16/07
03/20/07
4,040
100
4,000 05/09/01
06/07/01
10,897
100
6,641
100
Crossings 1.0
Intersections 42.0
07/28/03
07/30/03
0 07/26/03
08/01/03
Locations
210 06 0163 / 4414
E 87TH ST AND S COTTAGE GROVE AVE
.50
10/01/02
10/15/02
31,843 10/08/02
12/16/02
30,190
100
814 06 0210 / 16422
8699 S ANTHONY AVE
1.0
05/17/94
05/17/94
0 05/17/94
05/17/94
120,000
100
814 06 0205 / 16417
8655 S SOUTH CHICAGO AVE
1.0
05/23/94
05/23/94
0 05/23/94
05/23/94
120,000
100
210 06 0072 / 4336
8500 S YATES AVE
1.0
03/01/01
05/01/01
150,000 10/16/00
01/17/01
119,320
100
3.50
181,843
389,510
479,759
649,492
Totals per Construction Phase
1,715,310
2,255,577
Totals for Ward 08
1,715,810
2,261,390
Totals per TSM Install Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 94
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32454
ALTEGELD GARDENS
12/31/07
276,000 08/31/07
5,500
25
300 06 / 32455
Lighting project to include private streets being maintained by BOE forces Note Last Updated on 11-FEB-08 PHILLIP MURRAY HOMES .0 04/02/07 12/10/08
28,000 11/02/07
24,000
95
300 06 0308 / 5414
Block 15 & 16 will be done together with Altgeld Gardens as they are bounded by each other Note Last Updated on 11-FEB-08 ON S WABASH AVE FROM E 105TH ST TO E 107TH ST .0 02/01/06 07/31/06
0 02/01/06
07/31/06
2,323
100
300 06 0292 / 5399
106 E 107TH ST
1.0
03/01/05
03/31/05
2,000 01/04/05
02/09/05
0
100
300 06 0292 / 5399
813 E 114TH ST
1.0
02/28/05
03/18/05
2,000 10/08/04
11/15/04
614
100
Totals per Design/Engineering
.0
2.0
04/02/07
308,000
32,437
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 95
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 09 / 33075
ON E 117TH ST FROM S CALUMET AVE TO S FRONT AVE
3.0
09/08/08
09/12/08
1,200 09/03/08
09/03/08
675
100
300 09 / 33075
ON E 118TH PL FROM S MICHIGAN AVE TO S STATE ST
3.0
02/01/08
12/31/08
1,200 09/02/08
09/02/08
675
100
300 09 / 33075
MATERIAL ORDERED Note Last Updated on 28-JUL-08 ON E 118TH ST FROM S STATE ST TO S MICHIGAN AVE
2.0
09/02/08
09/03/08
800 09/02/08
09/03/08
450
100
300 09 / 33075
ON E 126TH ST FROM S STATE ST TO S MICHIGAN AVE
5.0
09/03/08
09/04/08
2,000 09/03/08
09/04/08
1,125
100
300 09 / 33075
ON S CALUMET AVE FROM E 108TH ST TO E 109TH ST
4.0
09/03/08
09/03/08
1,600 09/03/08
09/03/08
900
100
300 09 / 33075
ON S EBERHART AVE FROM E 107TH ST TO E 108TH ST
5.0
09/03/08
09/03/08
2,000 09/03/08
09/03/08
1,125
100
300 09 / 33075
ON S FOREST AVE FROM E 106TH ST TO E 107TH ST
5.0
09/04/08
09/04/08
2,000 09/04/08
09/04/08
1,125
100
300 09 / 33075
ON S INDIANA AVE FROM E 101ST ST TO E 102ND ST
3.0
09/08/08
09/10/08
1,200 09/03/08
09/03/08
675
100
300 09 / 33075
ON S INDIANA AVE FROM E 113TH ST TO E 114TH PL
6.0
09/05/08
09/05/08
2,400 09/05/08
09/05/08
1,350
100
300 09 / 33075
ON S LAFAYETTE AVE FROM W 122ND ST TO W 123RD ST
3.0
09/05/08
09/05/08
1,200 09/05/08
09/05/08
675
100
300 06 0069 / 5233
ON S MARYLAND AVE FROM E 104TH ST TO E 106TH ST
8.0
3,000 05/08/02
05/08/02
3,000
100
300 09 / 33075
ON S PERRY AVE FROM W 121ST ST TO W 122ND ST
4.0
09/08/08
09/08/08
1,600 09/08/08
09/08/08
900
100
300 09 / 33075
ON S PRAIRIE AVE FROM E 104TH ST TO E 106TH ST
8.0
09/02/08
09/02/08
3,200 09/02/08
09/02/08
1,575
100
300 09 / 33075
ON S VERNON AVE FROM E 101ST ST TO E 102ND ST
4.0
09/08/08
09/08/08
1,600 09/08/08
09/08/08
900
100
302 00 0092 / 5774
ON S WABASH AVE FROM E 105TH ST TO E 110TH ST
30.0
0 12/27/01
12/27/01
6,179
100
300 09 / 33075
ON S WALLACE ST FROM W 99TH ST TO W 101ST ST
5.0
2,000 09/02/08
09/03/08
1,125
100
302 00 0092 / 5774
11300-11399 S CALUMET AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11400-11499 S CALUMET AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11300-11399 S FOREST AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11400-11499 S FOREST AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
10100-10199 S PERRY AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
10200-10299 S PERRY AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11300-11399 S PRAIRIE AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11400-11499 S PRAIRIE AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11500-11599 S PRAIRIE AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
10059 S STATE ST
1.0
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
10900-10999 S VERNON AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11000-11099 S VERNON AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11100-11199 S VERNON AVE
5.0
0 10/04/01
10/05/01
1,029
100
302 00 0092 / 5774
11200-11299 S VERNON AVE
5.0
0 10/04/01
10/05/01
1,029
100
09/08/08
10/25/01
09/12/08
10/27/01
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 96
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
Fixtures 164.0
27,236
36,067
Fixtures
300 09 / 33075
ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE
56.0
11/17/08
12/08/08
22,400 12/15/08
01/09/09
18,928
100
300 09 / 33075
ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE
8.0
09/15/08
09/19/08
3,200 12/15/08
12/19/08
2,707
100
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
7.0
12/15/08
01/09/09
2,800 12/15/08
01/09/09
2,366
100
300 09 / 33074
10000-10300 S COTTAGE GROVE AVE
21.0
09/22/08
10/03/08
8,400 12/16/08
12/29/08
8,400
100
300 06 / 33764
10000-11600 S MICHIGAN AVE
181.0
12/01/08
04/30/09
72,400 12/01/08
01/09/09
60,608
100
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
273.0
109,200
93,009
Installations
300 06 0204 / 5327
E 111TH ST AND S DR MARTIN LUTHER KING JR DR
2.0
08/15/01
08/15/01
640 10/03/01
10/03/01
640
100
300 06 0204 / 5327
E 111TH ST AND S VERNON AVE
2.0
08/15/01
08/15/01
640 10/03/01
10/03/01
640
100
300 06 0204 / 5327
400 E 111TH ST
2.0
08/15/01
08/15/01
640 09/29/01
09/29/01
640
100
300 06 0096 / 5258
34 E 112TH PL
1,898.0
03/01/03
09/01/03
49,575 03/01/06
09/01/06
57,346
0
302 00 0092 / 5774
34 E 112TH PL
39.0
0 03/16/01
01/24/02
9,190
100
805 06 0917 / 7103
362 E 119TH ST
1.0
0 06/07/95
06/07/95
300
100
302 00 0092 / 5774
221 E KENSINGTON AVE
1.0
0 03/23/01
03/23/01
236
100
805 06 0805 / 6991
10441 S CALUMET AVE
1.0
02/19/96
02/19/96
0 02/19/96
02/19/96
300
100
805 06 0324 / 6510
11431 S CHAMPLAIN AVE
1.0
01/03/95
01/03/95
0 01/03/95
01/03/95
300
100
805 06 1590 / 7776
12059 S INDIANA AVE
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
805 06 0316 / 6502
12438 S LA SALLE ST
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
302 00 0092 / 5774
11232 S MICHIGAN AVE
1.0
0 01/11/02
01/11/02
236
100
302 00 0092 / 5774
11000 S WABASH AVE
1.0
0 11/30/01
11/30/01
236
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
34 E 112TH PL
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
34 E 112TH PL
06/07/95
06/07/95
1,951.0
51,495
70,664
Lamps 1,536.0
06/01/07
12/31/07
45,219 01/22/08
02/13/08
43,852
100
0 09/09/02
09/14/02
28,059
100
Installations 1,541.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 97
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Fixtures
Work Type: Flood Light Install 300 06 0198 / 5323
ALTGELD GARDENS (CHA)
300 06 0204 / 5327
E 111TH ST AND S DR MARTIN LUTHER KING JR DR
300 06 0071 / 5234
201 E 111TH ST
2.0
300 09 / 33074
139,000 02/05/01
02/28/01
138,085
100
10/16/01
2,350 10/03/01
10/03/01
0
100
06/01/99
12/30/00
0 09/14/00
09/15/00
4,500
100
141,350
142,585
Installations
10000-10300 S COTTAGE GROVE AVE
Work Type: Lighting Imprvmnts
02/28/01
10/16/01
2.0
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
02/05/01
11.0
02/01/08
12/31/08
6,560 12/16/08
12/29/08
7,560
100
Projects
300 06 / 32454
ALTEGELD GARDENS
.0
04/02/07
12/31/08
2,760,000
0
0
300 06 / 32455
PHILLIP MURRAY HOMES
.0
04/02/07
12/31/08
500,000
0
0
3,260,000
0
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
.0
Fixtures
300 09 / 33075
ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE
56.0
11/24/08
12/24/08
75,600 12/15/08
01/09/09
64,176
100
300 09 / 33075
ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE
8.0
09/22/08
09/30/08
10,800 12/15/08
12/19/08
9,153
100
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
7.0
12/15/08
01/09/09
9,450 12/15/08
01/09/09
8,022
100
300 09 / 33074
10000-10300 S COTTAGE GROVE AVE
21.0
10/06/08
10/24/08
28,350 01/23/09
01/29/09
27,953
100
300 06 / 33764
10000-11600 S MICHIGAN AVE
179.0
12/01/08
04/30/09
241,550 12/01/08
01/09/09
237,954
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
34 E 112TH PL
Work Type: Residntl Staggered Lighting
271.0
365,750
347,258
0
Lamps .0
03/01/08
12/01/08
0
0
Blocks
300 09 / 33075
ON S PRAIRIE AVE FROM E 100TH ST TO E 102ND ST
2.0
09/08/08
12/05/08
137,000
300 06 0308 / 5414
ON S WABASH AVE FROM E 105TH ST TO E 107TH ST
2.0
06/05/06
08/15/06
190,228 06/05/06
08/15/06
0
0
131,870
100
Project has been completed as of 08/15/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON S LANGLEY AVE FROM E 112TH ST TO E 114TH ST
4.0
327,228
131,870
Blocks 2.0
03/26/03
05/21/03
166,636 03/26/03
06/01/03
156,226
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 98
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
10315 S MICHIGAN AVE
1.0
0 06/20/01
06/20/01
378
100
302 00 0092 / 5774
10316 S MICHIGAN AVE
1.0
0 06/20/01
06/20/01
378
100
302 00 0092 / 5774
10327 S MICHIGAN AVE
1.0
0 06/20/01
06/20/01
378
100
302 00 0092 / 5774
10328 S MICHIGAN AVE
1.0
0 06/20/01
06/20/01
378
100
4.0
0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
1,512
Locations
300 09 / 33075
ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE
56.0
09/05/08
09/12/08
16,800 09/05/08
09/12/08
11,760
100
300 09 / 33075
ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE
16.0
02/01/08
12/31/08
4,800 11/12/08
11/21/08
4,515
100
300 09 / 33075
ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE
8.0
09/02/08
09/10/08
2,400 09/02/08
09/05/08
1,680
100
300 04 0216 / 5114
ON S MICHIGAN AVE FROM E 113TH ST TO E 115TH ST
28.0
05/01/06
11/01/06
6,056 05/17/06
06/22/06
6,056
100
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
7.0
09/05/08
09/12/08
2,100 09/05/08
09/12/08
1,470
100
210 06 0166 / 4417
E 100TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/17/03
2,180
100
210 06 0166 / 4417
E 103RD ST AND S DR MARTIN LUTHER KING JR DR
04/22/03
05/10/03
3,000 04/22/03
05/16/03
2,180
100
210 06 0166 / 4417
E 107TH ST AND S DR MARTIN LUTHER KING JR DR
04/22/03
05/10/03
3,000 04/22/03
05/16/03
2,180
100
210 06 0166 / 4417
E 107TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/10/03
2,180
100
210 06 0166 / 4417
E 111TH ST AND S DR MARTIN LUTHER KING JR DR
04/22/03
05/10/03
3,000 04/22/03
05/10/03
2,180
100
210 06 0166 / 4417
E 111TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/09/03
2,180
100
210 06 0166 / 4417
E 113TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/05/03
2,180
100
210 06 0166 / 4417
E 115TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/07/03
2,180
100
210 06 0166 / 4417
E 119TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/06/03
2,180
100
210 06 0166 / 4417
E 127TH ST AND S MICHIGAN AVE
04/22/03
05/10/03
3,000 04/22/03
05/03/03
2,180
100
300 09 / 33074
10000-10300 S COTTAGE GROVE AVE
21.0
08/27/08
09/12/08
6,700 07/07/08
07/15/08
4,410
100
300 06 / 33764
10000-11600 S MICHIGAN AVE
236.0
12/01/08
04/30/09
52,050 12/01/08
12/19/08
44,610
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 300 06 0204 / 5327
E 111TH ST AND S VERNON AVE
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
34 E 114TH PL
372.0
120,906
96,301
Blocks 5.0
10/15/01
10/15/01
1,050 09/29/01
09/29/01
1,029
100
03/01/04
12/01/04
5,091 07/31/06
08/16/06
10,661
100
Lamps 979.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 99
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2880 / 9066
698 E 100TH ST
28.0
06/03/94
06/03/94
0 06/03/94
06/03/94
21,000
100
805 06 2519 / 8705
694 E 103RD ST
34.0
01/24/96
01/24/96
0 01/24/96
01/24/96
25,500
100
805 06 2320 / 8506
598 E 105TH ST
28.0
06/03/94
06/03/94
0 06/03/94
06/03/94
21,000
100
805 06 2354 / 8540
590 E 107TH ST
34.0
03/19/96
03/19/96
0 03/19/96
03/19/96
25,500
100
805 06 2774 / 8960
598 E 109TH ST
28.0
06/03/94
06/03/94
0 06/03/94
06/03/94
21,000
100
805 06 2356 / 8542
530 E 111TH ST
32.0
04/01/96
04/01/96
0 04/01/96
04/01/96
24,000
100
300 06 0099 / 5260
34 E 112TH PL
284.0
08/28/03
09/02/03
15,962 08/26/03
08/27/03
12,851
100
805 06 2655 / 8841
498 E 113TH ST
24.0
06/06/94
06/06/94
0 06/06/94
06/06/94
18,000
100
805 06 2302 / 8488
101 E 116TH ST
14.0
12/03/93
12/03/93
0 12/03/93
12/03/93
10,500
100
805 06 2830 / 9016
198 E 130TH ST
26.0
05/15/94
05/15/94
0 05/15/94
05/15/94
19,500
100
805 06 2206 / 8392
815 E 95TH ST
44.0
06/19/97
06/19/97
0 06/19/97
06/19/97
33,000
100
805 06 2436 / 8622
432 E KENSINGTON AVE
34.0
10/27/95
10/27/95
0 10/27/95
10/27/95
25,500
100
805 06 2829 / 9015
11695 S INDIANA AVE
10.0
05/01/94
05/01/94
0 05/01/94
05/01/94
7,500
100
805 06 2177 / 8363
13001 S INDIANA AVE
18.0
04/11/97
04/11/97
0 04/11/97
04/11/97
13,500
100
805 06 2178 / 8364
13001 S INDIANA AVE
14.0
12/31/95
12/31/95
0 12/31/95
12/31/95
10,500
100
302 00 0070 / 5758
13140 S INDIANA AVE
0 04/04/97
04/11/97
16,636
100
805 06 2347 / 8533
11598 S MICHIGAN AVE
14.0
11/26/93
11/26/93
0 11/26/93
11/26/93
10,500
100
805 06 2556 / 8742
11701 S PRAIRIE AVE
10.0
06/14/95
06/14/95
0 06/14/95
06/14/95
7,500
100
Totals per Underpass Lighting Totals per Lighting/Electrical
676.0
15,962
323,487
4,643,683
1,490,140
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 100
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0166 / 4417
E 100TH ST AND S MICHIGAN AVE
1.0
02/02/03
02/07/03
12,000 02/07/03
02/10/03
11,895
100
210 06 0166 / 4417
E 103RD ST AND S DR MARTIN LUTHER KING JR DR
1.0
02/02/03
02/07/03
12,000 02/11/03
05/16/03
11,895
100
210 06 0166 / 4417
E 107TH ST AND S DR MARTIN LUTHER KING JR DR
1.0
02/04/03
02/08/03
12,000 02/17/03
02/19/03
11,895
100
210 06 0166 / 4417
E 107TH ST AND S MICHIGAN AVE
1.0
02/04/03
02/08/03
12,000 02/19/03
02/21/03
11,895
100
210 06 0166 / 4417
E 111TH ST AND S DR MARTIN LUTHER KING JR DR
1.0
02/06/03
02/09/03
12,000 02/24/03
02/26/03
11,895
100
210 06 0166 / 4417
E 111TH ST AND S MICHIGAN AVE
1.0
02/06/03
02/09/03
12,000 02/26/03
02/28/03
11,895
100
210 06 0166 / 4417
E 113TH ST AND S MICHIGAN AVE
1.0
02/06/03
02/09/03
12,000 03/03/03
03/05/03
11,896
100
210 06 0166 / 4417
E 115TH ST AND S MICHIGAN AVE
1.0
02/10/03
02/12/03
12,000 03/05/03
03/06/03
11,896
100
210 06 0166 / 4417
E 119TH ST AND S MICHIGAN AVE
1.0
02/10/03
02/12/03
12,000 03/06/03
03/07/03
11,896
100
210 06 0166 / 4417
E 127TH ST AND S MICHIGAN AVE
1.0
02/10/03
02/12/03
12,000 03/07/03
03/10/03
11,896
100
Totals per LED Signal Head Install
Work Type: Removal Temp Wiring - Signals
10.0
120,000
118,954
Crossings
300 06 0197 / 5322
S MICHIGAN AVE AND E 127TH ST
1.0
4,000 04/30/01
05/03/01
1,885
100
300 06 0197 / 5322
S WALLACE ST AND W VERMONT ST
1.0
4,000 04/27/01
05/17/01
3,631
100
2.0
8,000
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
34 E 112TH PL
Work Type: TSM Install
5,516
Intersections 25.0
07/22/03
07/25/03
0 07/21/06
09/28/06
3,953
100
Locations
210 06 0074 / 4338
100 E 103RD ST
1.0
04/01/03
06/01/03
242,000 03/14/03
07/10/03
227,309
100
210 06 0069 / 4333
10000 S DR MARTIN LUTHER KING JR DR
1.0
06/01/99
12/01/99
167,500 07/30/99
01/20/00
112,132
100
814 06 0251 / 16463
11100 S DR MARTIN LUTHER KING JR DR
1.0
08/15/89
08/15/89
0 08/15/89
08/15/89
80,756
100
814 06 0066 / 16282
11100 S ELLIS AVE
1.0
03/26/91
03/26/91
0 03/26/91
03/26/91
212,115
100
814 06 0123 / 16337
13000 S ELLIS AVE
1.0
03/02/95
03/02/95
0 03/02/95
03/02/95
392,625
100
814 06 0250 / 16462
11100 S INDIANA AVE
1.0
09/26/89
09/26/89
0 09/26/89
09/26/89
80,756
100
814 06 0112 / 16327
13000 S INDIANA AVE
1.0
03/01/95
03/01/95
0 03/01/95
03/01/95
392,625
100
814 06 0252 / 16464
11100 S MICHIGAN AVE
1.0
08/10/89
08/10/89
0 08/10/89
08/10/89
80,756
100
Totals per TSM Install Totals per Traffic
8.0
409,500
1,579,074
542,429
1,711,515
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 101
1/1/2008 AND 12/31/2008
Ward 09 Anthony Beale CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 09 / 33075
ON E 103RD ST FROM S DAUPHIN AVE TO S WABASH AVE
7.0
09/05/08
09/12/08
2,600 09/05/08
09/12/08
2,324
100
300 09 / 33075
ON E 111TH ST FROM S COTTAGE GROVE AVE TO S INDIANA AVE
1.0
11/12/08
11/21/08
129 11/12/08
11/21/08
84
100
300 09 / 33075
ON E 111TH ST FROM S STATE ST TO S MICHIGAN AVE
5.0
09/02/08
09/10/08
2,200 09/02/08
09/05/08
1,610
100
Totals per Traffic Equipment Painting
13.0
4,929
4,018
Totals per Construction Phase
5,186,112
3,201,655
Totals for Ward 09
5,494,112
3,234,092
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 102
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0288 / 5395
TRUMBALL HOMES (CHA)
.0
09/01/04
12/31/04
0 09/01/04
1,465
100
300 06 / 32277
ON S AVENUE H FROM E 98TH ST TO E 99TH ST
1.0
04/01/08
08/30/08
65,000 04/26/08
0
70
300 06 / 32277
ON S AVENUE J FROM E 98TH ST TO E 99TH ST
1.0
04/01/08
08/30/08
65,000 04/26/08
0
70
300 06 / 32277
ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST
2.0
04/01/08
08/30/08
130,000 04/26/08
0
70
300 06 0308 / 5414
ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,608
100
300 06 0308 / 5414
ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,608
100
281 00 / 33670
10609 S AVENUE B
.0
01/01/08
12/31/08
0
300 06 / 32275
10700-10900 S HOXIE AVE
.0
03/01/07
10/31/07
Totals per Design/Engineering
4.0
3,900 02/12/07 263,900
12/31/04
03/12/07
0
0
2,790
100
7,471
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 103
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233
ON S EXCHANGE AVE FROM E 87TH ST TO E 91ST ST
300 06 0069 / 5233
3020 E 97TH ST
Totals per 250 Watt Changeout Totals per Lighting/Electrical
Fixtures 19.0
08/12/02
08/12/02
3,857 08/09/02
08/09/02
3,990
100
2.0
09/28/02
09/28/02
406 09/25/02
09/25/02
420
100
21.0
4,263
4,410
1,694,939
1,751,040
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 104
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0096 / 5258
3522 E 106TH ST
2,164.0
56,523 03/01/06
09/01/06
65,383
0
302 00 0092 / 5774
3522 E 106TH ST
85.0
0 01/04/01
01/11/02
20,030
100
302 00 0092 / 5774
3456 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
3501 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
3524 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
3525 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
3556 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
3557 E 112TH ST
1.0
0 03/27/01
03/27/01
236
100
302 00 0092 / 5774
9800 S AVENUE H
1.0
0 12/11/01
12/11/01
236
100
805 06 0869 / 7055
9716 S AVENUE J
1.0
11/01/95
11/01/95
0 11/01/95
11/01/95
300
100
805 06 0849 / 7035
9640 S BALTIMORE AVE
1.0
10/18/96
10/18/96
0 10/18/96
10/18/96
300
100
805 06 1756 / 7942
9640 S BALTIMORE AVE
1.0
05/01/97
05/01/97
0 05/01/97
05/01/97
300
100
805 06 1777 / 7963
13016 S BURLEY AVE
1.0
04/17/97
04/17/97
0 04/17/97
04/17/97
300
100
805 06 1663 / 7849
13036 S BURLEY AVE
1.0
08/06/97
08/06/97
0 08/06/97
08/06/97
300
100
302 00 0092 / 5774
8740 S COMMERCIAL AVE
1.0
0 03/19/01
03/19/01
236
100
805 06 1538 / 7724
9558 S COMMERCIAL AVE
1.0
01/21/97
01/21/97
0 01/21/97
01/21/97
300
100
805 06 1519 / 7705
9610 S COMMERCIAL AVE
1.0
01/21/97
01/21/97
0 01/21/97
01/21/97
300
100
805 06 1530 / 7716
9656 S COMMERCIAL AVE
1.0
01/21/97
01/21/97
0 01/21/97
01/21/97
300
100
302 00 0092 / 5774
10199 S COMMERCIAL AVE
1.0
0 01/09/02
01/09/02
236
100
302 00 0092 / 5774
10241 S COMMERCIAL AVE
1.0
0 06/08/01
06/08/01
236
100
302 00 0092 / 5774
10253 S COMMERCIAL AVE
1.0
0 04/30/01
04/30/01
236
100
805 06 0678 / 6864
12643 S ESCANABA AVE
1.0
09/13/95
09/13/95
0 09/13/95
09/13/95
300
100
805 06 0587 / 6773
10912 S EWING AVE
1.0
01/06/95
01/06/95
0 01/06/95
01/06/95
300
100
805 06 1209 / 7395
8326 S HOUSTON AVE
1.0
01/30/97
01/30/97
0 01/30/97
01/30/97
300
100
805 06 1797 / 7983
13200 S MACKINAW AVE
1.0
04/10/97
04/10/97
0 04/10/97
04/10/97
300
100
805 06 0429 / 6615
10457 S TORRENCE AVE
1.0
05/31/95
05/31/95
0 05/31/95
05/31/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
3522 E 106TH ST
03/01/03
09/01/03
2,273.0
56,523
91,909
Lamps 1,944.0
06/01/07
12/31/07
57,231 01/31/08
02/11/08
55,501
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 105
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
3522 E 106TH ST
Work Type: Flood Light Install
Installations 2,768.0
0 09/13/02
09/25/02
50,400
100
Fixtures
300 06 0198 / 5323
TRUMBALL HOMES (CHA)
300 09 / 33076
2510 E 106TH ST
1.0
302 00 0092 / 5774
2949 E 126TH ST
302 00 0092 / 5774
06/14/01
06/15/01
13,500 06/19/01
06/26/01
29,493
100
10/22/08
10/23/08
500 10/22/08
10/23/08
768
100
1.0
0 04/27/01
04/27/01
471
100
2955 E 126TH ST
1.0
0 04/27/01
04/27/01
471
100
302 00 0092 / 5774
3001 E 126TH ST
1.0
0 04/27/01
04/27/01
471
100
302 00 0092 / 5774
3011 E 126TH ST
1.0
0 04/27/01
04/27/01
471
100
302 00 0092 / 5774
3015 E 126TH ST
1.0
0 04/27/01
04/27/01
471
100
300 09 / 33076
2610 E 136TH ST
2.0
300 06 0071 / 5234
9801 S AVENUE G
302 00 0092 / 5774
9050 S BRANDON AVE
302 00 0092 / 5774
10/22/08
10/23/08
1,000 10/22/08
10/23/08
1,537
100
01/01/00
12/30/00
0 09/15/00
09/22/00
9,450
100
1.0
0 07/10/01
07/10/01
471
100
9058 S BRANDON AVE
1.0
0 07/10/01
07/10/01
471
100
302 00 0092 / 5774
9546 S EWING AVE
1.0
0 11/09/01
11/09/01
404
100
300 09 / 33076
13600 S TORRENCE AVE
1.0
500 10/22/08
10/23/08
768
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
10609 S AVENUE B
Work Type: Lighting Imprvmnts 300 06 0288 / 5395
TRUMBALL HOMES (CHA)
281 00 / 33670
10609 S AVENUE B
Totals per Lighting Imprvmnts
Work Type: Loop Lighting 281 00 / 33670
10609 S AVENUE B
Work Type: Ornamental Lighting 281 00 / 33670
10609 S AVENUE B
10/22/08
10/23/08
12.0
15,500
45,717
0
0
0
Blocks 01/01/08
12/31/08
116.0
03/01/05
12/31/07
.0
01/01/08
12/31/08
.0
Installations
116.0
600,000 12/17/04
12/20/04
457,687
100
0
0
0
600,000
457,687
Blocks .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
Blocks .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 106
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Poles
Work Type: POD Camera Pole 281 00 / 33670
10609 S AVENUE B
.0
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Lamps
Work Type: Residential Regrouping 300 06 0270 / 5378
01/01/08
3522 E 106TH ST
.0
Blocks
Work Type: Residntl Staggered Lighting 300 06 / 32277
ON S AVENUE H FROM E 98TH ST TO E 99TH ST
.0
05/04/08
12/31/08
0
0
0
300 06 / 32277
ON S AVENUE J FROM E 98TH ST TO E 99TH ST
.0
05/04/08
12/31/08
0
0
0
300 06 / 32277
ON S BRANDON AVE FROM E 93RD ST TO E 91ST ST
.0
05/04/08
12/31/08
0
0
0
300 06 0298 / 5405
ON S BUFFALO AVE FROM E 108TH ST TO E 109TH ST
1.0
06/01/05
07/15/05
0 06/10/05
08/12/05
59,430
100
300 06 0298 / 5405
ON S MACKINAW AVE FROM E 108TH ST TO E 109TH ST
1.0
06/01/05
07/01/05
0 06/10/05
08/19/05
59,430
100
300 06 0308 / 5414
ON S MANISTEE AVE FROM E 97TH ST TO E 98TH ST
1.0
05/04/06
07/21/06
105,100 05/04/06
07/21/06
73,363
100
300 06 0308 / 5414
ON S MUSKEGON AVE FROM E 97TH ST TO E 98TH ST
1.0
05/04/06
07/21/06
105,100 05/04/06
07/21/06
73,363
100
300 06 / 32275
Project has been completed as of 07/21/2006 Note Last Updated on 25-AUG-06 10700-10900 S HOXIE AVE
2.0
04/01/07
12/31/07
199,647 04/02/07
07/13/07
117,514
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
6.0
409,847
383,100
Blocks
300 06 0235 / 5349
ON S ESCANABA AVE FROM E 85TH ST TO E 87TH ST
2.0
04/15/03
06/15/03
166,811 04/14/03
05/16/03
150,606
100
300 06 0267 / 5375
ON S EXCHANGE AVE FROM E 85TH ST TO E 87TH ST
2.0
09/20/04
11/20/04
177,934 10/06/04
11/05/04
136,319
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
10609 S AVENUE B
Work Type: Short Arm Installs - Residntl 281 00 / 33670
10609 S AVENUE B
302 00 0092 / 5774
9059 S BURLEY AVE
Totals per Short Arm Installs - Residntl
4.0
344,745
286,925
0
Locations .0
01/01/08
12/31/08
0
01/01/08
12/31/08
0
0
Locations .0 1.0
0 06/13/01
1.0
0
06/13/01
0
0
378
100
378
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 107
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0117 / 5271
ON E 106TH ST FROM S AVENUE O TO S AVENUE H
14.0
04/14/00
05/01/00
5,000 04/14/00
300 07 0010 / 5433
ON E 91ST ST FROM S EXCHANGE AVE TO S HOUSTON AVE
11.0
04/18/06
11/18/06
2,750 09/09/06
09/15/06
3,682
100
300 07 0010 / 5433
ON E 92ND ST FROM S EXCHANGE AVE TO S HOUSTON AVE
14.0
04/18/06
11/18/06
3,500 09/09/06
09/15/06
4,687
100
300 07 0010 / 5433
ON S COMMERCIAL AVE FROM E 91ST ST TO S SOUTH CHICAGO AVE
15.0
04/18/06
11/18/06
3,750 09/09/06
09/15/06
5,021
100
300 06 0117 / 5271
ON S EWING AVE FROM E 104TH ST TO E 108TH ST
68.0
04/14/00
05/01/00
24,000 04/14/00
300 04 0216 / 5114
ON S EWING AVE FROM E 97TH ST TO E 99TH ST
28.0
05/01/06
11/01/06
6,056 05/17/06
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
10609 S AVENUE B
Work Type: Strt Lighting 300 06 0135 / 5288
ON E 106TH ST FROM S AVENUE O TO S AVENUE H
300 06 0246 / 5356
ON E 131ST ST FROM S MARQUETTE AVE TO S EXCHANGE AVE
300 06 0135 / 5288
ON S EWING AVE FROM E 104TH ST TO E 108TH ST
Work Type: Traffic Signal Regrouping 3522 E 106TH ST
0 05/30/06
6,056
100
45,056
19,446
0
0
0
Blocks .0
01/01/08
12/31/08
09/01/01
11/01/01
43,200 10/25/00
11/08/00
37,574
100
09/01/03
12/31/03
33,052 08/20/03
08/30/04
33,052
100
57,600 10/25/00
11/08/00
0
100
Blocks 3.0
4.0 7.0
Totals per Strt Lighting
300 06 0139 / 5289
150.0
0
133,852
70,626
Lamps 1,381.0
03/01/04
12/01/04
7,181 07/31/06
08/09/06
15,039
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 108
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0099 / 5260
3522 E 106TH ST
369.0
09/03/03
09/08/03
20,741 08/28/03
09/02/03
13,886
100
805 06 2611 / 8797
2695 E 95TH ST
10.0
03/03/95
03/03/95
0 03/03/95
03/03/95
7,500
100
805 06 2325 / 8511
3105 E 95TH ST
10.0
05/24/96
05/24/96
0 05/24/96
05/24/96
7,500
100
302 00 0070 / 5758
9950 S AVENUE L
0 06/12/97
06/19/97
22,706
100
805 06 2165 / 8351
9951 S AVENUE L
56.0
06/19/97
06/19/97
0 06/19/97
06/19/97
42,000
100
805 06 2478 / 8664
9895 S AVENUE M
38.0
10/10/95
10/10/95
0 10/10/95
10/10/95
28,500
100
805 06 2456 / 8642
9932 S AVENUE M
20.0
10/02/95
10/02/95
0 10/02/95
10/02/95
15,000
100
302 00 0071 / 5759
9940 S EWING AVE
0 02/09/99
02/15/99
7,759
100
302 00 0071 / 5759
9950 S EWING AVE
0 02/04/99
02/15/99
19,493
100
805 06 2453 / 8639
10001 S EWING AVE
20.0
03/05/91
03/05/91
0 03/05/91
03/05/91
15,000
100
805 06 2454 / 8640
10001 S EWING AVE
27.0
03/05/91
03/05/91
0 03/05/91
03/05/91
20,250
100
805 06 2455 / 8641
10004 S EWING AVE
8.0
03/05/91
03/05/91
0 03/05/91
03/05/91
6,000
100
805 06 2394 / 8580
9499 S MANISTEE AVE
70.0
12/08/95
12/08/95
0 12/08/95
12/08/95
52,500
100
302 00 0071 / 5759
12600 S MARQUETTE AVE
0 03/03/98
03/05/98
2,808
100
805 06 2828 / 9014
9499 S SOUTH CHICAGO AVE
0 04/07/94
04/07/94
9,000
100
Totals per Underpass Lighting
12.0 640.0
04/07/94
04/07/94
20,741
269,902
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 109
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S AVENUE O AND E 133RD ST
1.0
0 03/19/02
03/19/02
8,539
100
210 06 0130 / 4389
S AVENUE O AND E 134TH ST
1.0
0 03/05/02
03/05/02
8,539
100
210 06 0130 / 4389
S EWING AVE AND E 99TH ST
1.0
0 09/27/01
09/27/01
8,539
100
210 06 0130 / 4389
S SOUTH SHORE DR AND E 83RD ST
.50
0 10/23/01
10/23/01
4,270
100
210 06 0130 / 4389
S TORRENCE AVE AND E 130TH ST
1.0
0 05/16/02
05/16/02
1,850
100
Totals per LED Signal Head Install
Work Type: Removal Temp Wiring - Signals
4.50
0
31,737
Crossings
300 06 0197 / 5322
ON E 87TH ST FROM S BUFFALO AVE TO S BURLEY AVE
2.0
8,000 05/18/01
06/07/01
9,231
100
300 06 0197 / 5322
S COMMERCIAL AVE AND E 91ST ST
3.0
12,000 05/18/01
06/04/01
11,076
100
300 06 0197 / 5322
S COMMERCIAL AVE AND E 92ND ST
3.0
12,000 05/07/01
05/21/01
9,938
100
300 06 0197 / 5322
9360 S SOUTH CHICAGO AVE
3.0
2,800 05/11/01
05/21/01
2,800
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
3522 E 106TH ST
Work Type: TSM Install
11.0
34,800
33,045
Intersections 43.0
07/13/03
07/20/03
0 07/11/06
10/17/06
6,799
100
Locations
300 06 0195 / 5320
E 133RD ST AND S AVENUE O
1.0
12/01/01
11/15/02
200,000 12/11/01
10/16/02
146,517
100
300 06 0195 / 5320
E 134TH ST AND S AVENUE O
1.0
12/01/01
06/30/02
200,000 11/16/01
02/28/02
146,517
100
210 06 0075 / 4339
E 95TH ST AND S EWING AVE
04/01/04
06/01/04
249,000 03/18/04
06/18/04
234,815
100
814 06 0189 / 16401
2500 E 130TH ST
1.0
04/03/95
04/03/95
0 04/03/95
04/03/95
125,000
100
814 06 0071 / 16287
10000 S COMMERCIAL AVE
1.0
11/28/94
11/28/94
0 11/28/94
11/28/94
74,947
100
814 06 0234 / 16446
10599 S MUSKEGON AVE
1.0
01/01/89
01/01/89
0 01/01/89
01/01/89
90,000
100
814 06 0075 / 16291
12200 S TORRENCE AVE
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
126,636
100
6.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
649,000
944,432
Locations
300 07 0010 / 5433
ON E 91ST ST FROM S HOUSTON AVE TO S EXCHANGE AVE
13.0
04/18/06
11/18/06
6,600 09/09/06
09/15/06
4,352
100
300 07 0010 / 5433
ON E 92ND ST FROM S HOUSTON AVE TO S EXCHANGE AVE
13.0
04/18/06
11/18/06
6,680 09/09/06
09/15/06
4,352
100
Totals per Traffic Equipment Painting
26.0
13,280
8,704
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 110
1/1/2008 AND 12/31/2008
Ward 10 John Pope CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Traffic Totals per Traffic
697,080
1,024,717
Totals per Construction Phase
2,392,019
2,775,757
Totals for Ward 10
2,655,919
2,783,228
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 111
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD
.0
04/01/08
08/30/08
0
0
300 06 / 32277
ON W 43RD PL FROM S WALLACE ST TO S CANAL ST
.0
04/01/08
08/30/08
0
0
0
300 06 0292 / 5399
S DAMEN AVE AND W 33RD ST
300 06 0308 / 5414
W 46TH PL AND S WALLACE ST
.0
02/01/06
300 06 0292 / 5399
3700 S NORMAL AVE
1.0
01/14/05
300 06 0282 / 5390
470 W 26TH ST
1.0
10/20/04
300 06 0292 / 5399
1548 W 33RD ST
1.0
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
Totals per Design/Engineering
5,000 01/20/05
04/08/05
1,454
100
07/31/06
75,861 02/01/06
07/31/06
1,296
100
03/28/05
5,000 12/15/04
05/09/05
5,000
100
02/23/05
1,000 01/15/05
02/28/05
0
100
2,000 06/16/05
09/08/05
840
100
0
0
0
0
0
0
88,861
8,590
1.0
4.0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 112
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 09 / 33077
ON S LEAVITT ST FROM W 34TH ST TO W 35TH ST
4.0
08/25/08
08/25/08
1,600 08/25/08
08/25/08
1,158
100
300 06 0122 / 5275
ON W 47TH PL FROM S UNION AVE TO S HALSTED ST
3.0
07/01/03
07/02/03
1,305 06/17/03
06/18/03
676
100
300 06 0122 / 5275
ON W 48TH ST FROM S UNION AVE TO S HALSTED ST
4.0
07/01/03
07/02/03
1,740 06/17/03
06/18/03
901
100
300 06 0069 / 5233
3100 S BENSON ST
5.0
10/06/02
10/06/02
1,015 10/03/02
10/03/02
1,050
100
300 06 0122 / 5275
2900 S CANAL ST
7.0
05/10/03
05/12/03
2,825 05/01/03
05/01/03
1,195
100
300 06 0122 / 5275
3359 S HOYNE AVE
11/01/03
11/01/03
1,291 11/05/03
11/05/03
586
100
300 06 0069 / 5233
3733 S PAULINA ST
1.0
11/08/02
11/08/02
203 11/05/02
11/05/02
210
100
300 06 0069 / 5233
4400 S UNION AVE
3.0
05/12/02
05/12/02
609 05/09/02
05/09/02
630
100
300 06 0069 / 5233
4335 S WALLACE ST
1.0
01/26/03
01/26/03
203 01/23/03
01/23/03
210
100
300 06 0069 / 5233
1814 W 35TH ST
2.0
01/31/03
01/31/03
406 01/30/03
01/30/03
420
100
300 06 0069 / 5233
1644 W 37TH PL
1.0
11/08/02
11/08/02
203 11/05/02
11/05/02
210
100
300 06 0122 / 5275
1900 W 38TH ST
2.0
06/02/03
06/03/03
950 05/06/03
05/06/03
225
100
300 06 0122 / 5275
1936 W 38TH ST
1.0
05/04/03
05/04/03
375 05/01/03
05/01/03
119
100
300 06 0122 / 5275
1944 W 38TH ST
1.0
05/04/03
05/04/03
375 05/01/03
05/01/03
119
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
35.0
13,100
7,709
Fixtures
300 06 0225 / 5340
ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST
06/05/03
06/13/03
5,000 06/05/03
06/13/03
9,026
100
300 06 0225 / 5340
ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE
06/05/03
06/13/03
7,500 06/05/03
06/13/03
11,905
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
12,500
20,931
3,852,550
4,201,250
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 113
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0727 / 6913
3217 S ARCHER AVE
1.0
03/28/96
03/28/96
0 03/28/96
03/28/96
300
100
805 06 0708 / 6894
3272 S ARCHER AVE
1.0
01/08/97
01/08/97
0 01/08/97
01/08/97
300
100
805 06 0743 / 6929
4325 S EMERALD AVE
1.0
09/17/96
09/17/96
0 09/17/96
09/17/96
300
100
805 06 0724 / 6910
4532 S EMERALD AVE
1.0
08/19/96
08/19/96
0 08/19/96
08/19/96
300
100
805 06 0735 / 6921
4640 S EMERALD AVE
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
805 06 1068 / 7254
3624 S HALSTED ST
1.0
03/22/96
03/22/96
0 03/22/96
03/22/96
300
100
300 06 0139 / 5289
3659 S HALSTED ST
1,527.0
03/01/06
09/01/06
33,308 02/15/06
03/01/06
46,137
100
302 00 0092 / 5774
3659 S HALSTED ST
41.0
0 01/29/01
01/25/02
9,662
100
805 06 0353 / 6539
3620 S LEAVITT ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 1832 / 8018
2707 S LOWE AVE
1.0
01/04/96
01/04/96
0 01/04/96
01/04/96
300
100
805 06 1850 / 8036
2820 S LOWE AVE
1.0
01/06/95
01/06/95
0 01/06/95
01/06/95
300
100
805 06 1871 / 8057
4534 S LOWE AVE
1.0
07/06/95
07/06/95
0 07/06/95
07/06/95
300
100
805 06 1958 / 8144
3601 S MORGAN ST
1.0
09/17/96
09/17/96
0 09/17/96
09/17/96
300
100
805 06 1959 / 8145
3611 S MORGAN ST
1.0
09/17/96
09/17/96
0 09/17/96
09/17/96
300
100
805 06 1960 / 8146
3619 S MORGAN ST
1.0
09/17/96
09/17/96
0 09/17/96
09/17/96
300
100
805 06 0609 / 6795
2914 S PARNELL AVE
1.0
02/03/97
02/03/97
0 02/03/97
02/03/97
300
100
805 06 1730 / 7916
2934 S PARNELL AVE
1.0
05/29/97
05/29/97
0 05/29/97
05/29/97
300
100
805 06 0610 / 6796
3045 S PARNELL AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0611 / 6797
3839 S PARNELL AVE
1.0
07/17/96
07/17/96
0 07/17/96
07/17/96
300
100
805 06 1677 / 7863
2702 S PRINCETON AVE
1.0
07/28/97
07/28/97
0 07/28/97
07/28/97
300
100
805 06 0581 / 6767
3236 S PRINCETON AVE
1.0
06/19/95
06/19/95
0 06/19/95
06/19/95
300
100
805 06 0569 / 6755
2741 S QUINN ST
1.0
06/17/96
06/17/96
0 06/17/96
06/17/96
300
100
805 06 0672 / 6858
2640 S SHIELDS AVE
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
805 06 0650 / 6836
2743 S SHIELDS AVE
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1630 / 7816
2912 S SHIELDS AVE
1.0
09/18/97
09/18/97
0 09/18/97
09/18/97
300
100
805 06 1554 / 7740
3638 S UNION AVE
1.0
10/15/97
10/15/97
0 10/15/97
10/15/97
300
100
805 06 1764 / 7950
3817 S UNION AVE
1.0
05/13/97
05/13/97
0 05/13/97
05/13/97
300
100
805 06 1459 / 7645
4639 S WALLACE ST
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 0538 / 6724
2855 S WELLS ST
1.0
07/24/95
07/24/95
0 07/24/95
07/24/95
300
100
805 06 0539 / 6725
3023 S WENTWORTH AVE
1.0
12/13/96
12/13/96
0 12/13/96
12/13/96
300
100
805 06 0921 / 7107
333 W 25TH PL
1.0
12/13/95
12/13/95
0 12/13/95
12/13/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 114
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0937 / 7123
340 W 26TH ST
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
805 06 0912 / 7098
344 W 26TH ST
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
805 06 1741 / 7927
630 W 26TH ST
1.0
05/15/97
05/15/97
0 05/15/97
05/15/97
300
100
805 06 0913 / 7099
312 W 27TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
302 00 0092 / 5774
324 W 27TH ST
1.0
0 05/03/01
05/03/01
236
100
805 06 0914 / 7100
333 W 27TH ST
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
805 06 0915 / 7101
343 W 27TH ST
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
805 06 0886 / 7072
848 W 27TH ST
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 0888 / 7074
323 W 28TH PL
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 0872 / 7058
345 W 28TH PL
1.0
08/16/95
08/16/95
0 08/16/95
08/16/95
300
100
805 06 0890 / 7076
353 W 28TH PL
1.0
08/16/95
08/16/95
0 08/16/95
08/16/95
300
100
805 06 0911 / 7097
334 W 29TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1525 / 7711
1300 W 32ND PL
1.0
11/05/97
11/05/97
0 11/05/97
11/05/97
300
100
805 06 1769 / 7955
1240 W 32ND ST
1.0
05/15/97
05/15/97
0 05/15/97
05/15/97
300
100
805 06 0926 / 7112
525 W 45TH ST
1.0
02/07/97
02/07/97
0 02/07/97
02/07/97
300
100
805 06 0928 / 7114
527 W 46TH ST
1.0
04/18/95
04/18/95
0 04/18/95
04/18/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
3659 S HALSTED ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
3659 S HALSTED ST
1,613.0
33,308
69,235
Lamps 2,064.0
06/01/07
12/31/07
60,764 09/01/07
10/26/07
60,764
100
0 07/15/02
07/18/02
35,488
100
Installations 1,949.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 115
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 06 0198 / 5323
BRIDGE PORT HOMES (CHA)
10,750 06/01/01
06/01/01
15,675
100
302 00 0092 / 5774
S BONFIELD ST AND W 31ST ST
1.0
0 05/14/01
05/14/01
471
100
300 06 0069 / 5233
3401 S CLAREMONT AVE
3.0
1,455 11/13/02
11/13/02
1,300
100
300 06 0167 / 5306
3706 S UNION AVE
1.0
0 01/17/99
01/17/99
351
100
302 00 0092 / 5774
3020 S WALLACE ST
1.0
0 05/08/01
05/08/01
471
100
302 00 0092 / 5774
3032 S WALLACE ST
1.0
0 05/08/01
05/08/01
471
100
302 00 0092 / 5774
244 W 33RD ST
2.0
0 09/10/01
09/10/01
689
100
300 06 0071 / 5234
2210 W PERSHING RD
0 09/13/00
09/14/00
5,400
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
06/08/01
01/01/00
06/09/01
12/30/00
9.0
12,205
24,828
Blocks
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts
.0
Installations
300 06 0292 / 5399
1548 W 33RD ST
.0
03/01/05
12/31/05
0 03/01/05
281 00 / 33670
Operations project Note Last Updated on 01-NOV-07 911 W 37TH ST
.0
01/01/08
12/31/08
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts 300 06 0199 / 5324
ON S EMERALD AVE FROM W 35TH ST TO W 37TH ST
Work Type: Loop Lighting
.0
12/31/05
0
0
0
0
0
0
0
0
0
0
Projects 1.0
07/01/01
12/01/01
185,721 06/04/01
08/22/01
153,368
100
Blocks
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Loop Lighting
.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 116
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting
Blocks
300 06 0156 / 5296
ON W 26TH ST FROM S NORMAL AVE TO S HALSTED ST
3.0
11/01/01
08/30/02
14,000 11/29/01
05/13/02
91,995
100
300 06 0156 / 5296
ON W 35TH ST FROM S NORMAL AVE TO S MORGAN ST
6.0
08/01/01
02/15/02
294,500 09/04/01
12/14/01
229,272
100
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
308,500
321,267
Totals per Ornamental Lighting
Work Type: POD Camera Pole
9.0
Poles
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
0
0
0
0
0
Totals per POD Camera Pole
Work Type: Residential Regrouping 300 06 0270 / 5378
3659 S HALSTED ST
Work Type: Residntl Staggered Lighting
.0
Lamps .0
03/01/08
12/01/08
Blocks
300 05 0011 / 5126
ON S ARCHER AVE FROM S LOOMIS ST TO S PITNEY CT
3.0
04/04/05
11/18/05
210,000 11/07/05
03/10/06
192,236
100
300 05 0011 / 5126
ON S CANAL ST FROM W 29TH ST TO W 31ST ST
2.0
04/04/05
11/18/05
170,000 10/10/05
11/30/05
105,431
100
300 05 0011 / 5126
ON S EMERALD AVE FROM W 45TH ST TO W 47TH ST
2.0
04/04/05
11/18/05
170,000 10/10/05
11/30/05
128,603
100
300 06 / 32277
ON S LOWE AVE FROM W 37TH ST TO W PERSHING RD
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON S SEELEY AVE FROM W 35TH ST TO W 37TH ST
2.0
06/20/05
07/30/05
0 07/06/05
300 07 0011 / 5434
ON S UNION AVE FROM W 31ST ST TO W 33RD ST
2.0
05/01/07
07/01/07
170,000 11/15/06
300 09 / 33077
ON S WALLACE ST FROM W 43RD ST TO W 44TH ST
1.0
300 06 / 32277
ON W 43RD PL FROM S WALLACE ST TO S CANAL ST
300 09 / 33077
ON W 43RD PL FROM S WALLACE ST TO S HALSTED ST
1.0
300 05 0011 / 5126
ON W 46TH ST FROM S STEWART AVE TO S UNION AVE
1.0
04/04/05
300 06 0308 / 5414
W 46TH PL AND S WALLACE ST
1.0
05/16/06
.0
65,000 04/01/08 05/04/08
12/31/08
08/19/05
12/01/08
0
0
0
115,086
100
111,582
95
0
0
0
0
65,000 04/01/08
12/01/08
0
0
11/18/05
85,000 09/08/05
11/11/05
50,929
100
08/01/06
75,861 05/16/06
08/01/06
66,683
100
project has been completed as of 08/01/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting
15.0
1,010,861
770,550
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 117
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 03 0011 / 4882
ON S LOWE AVE FROM W 31ST ST TO W 35TH ST
4.0
12/01/04
02/01/05
250,000 12/01/04
03/01/05
198,962
100
300 06 0122 / 5275
ON S LOWE AVE FROM W 35TH ST TO W 37TH ST
2.0
12/15/03
03/01/04
150,000 12/01/03
04/19/04
220,920
100
300 06 0069 / 5233
ON S LOWE AVE FROM W 44TH ST TO W 46TH ST
2.0
09/15/02
11/15/02
165,000 09/13/02
01/15/03
131,500
100
300 06 0069 / 5233
ON S NORMAL BLVD FROM W 29TH ST TO W 31ST ST
2.0
03/01/03
05/15/03
180,000 02/18/03
03/31/03
143,865
100
300 06 0122 / 5275
ON S PARNELL AVE FROM W 29TH ST TO W 31ST ST
2.0
12/01/03
02/15/04
161,000 11/11/03
04/19/04
182,881
100
300 06 0235 / 5349
ON S UNION AVE FROM W 33RD ST TO W 35TH ST
2.0
05/01/03
07/01/03
159,067 05/08/03
07/11/03
133,390
100
300 06 0069 / 5233
ON S UNION AVE FROM W 35TH ST TO W 37TH ST
2.0
02/01/03
04/15/03
185,000 02/10/03
03/19/03
171,317
100
300 06 0122 / 5275
ON S WELLS ST FROM W 31ST ST TO W 33RD ST
2.0
12/15/03
03/01/04
150,000 11/17/03
04/05/04
160,286
100
300 03 0011 / 4882
ON W 34TH PL FROM S WOOD ST TO S DAMEN AVE
2.0
10/15/04
12/15/04
160,000 08/05/04
09/16/04
135,651
100
300 06 0069 / 5233
ON W 44TH ST FROM S CANAL ST TO S UNION AVE
2.0
08/19/02
10/01/02
195,000 08/19/02
01/08/03
152,620
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial
22.0
1,755,067
1,631,392
Locations
302 00 0092 / 5774
3001 S PARNELL AVE
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
3013 S PARNELL AVE
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
3026 S PARNELL AVE
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
3043 S PARNELL AVE
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
3059 S PARNELL AVE
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
4800 S UNION AVE
1.0
0 03/26/01
03/26/01
378
100
302 00 0092 / 5774
4808 S UNION AVE
1.0
0 03/26/01
03/26/01
378
100
281 00 / 33670
911 W 37TH ST
302 00 0092 / 5774
1643 W 38TH PL
281 00 / 33670
1313 W FULLER ST
Totals per Short Arm Installs - Arterial
.0
01/01/08
12/31/08
8.0
0
0
378
100
0
0
0
0
3,024
0 04/20/01
1.0 .0
0
01/01/08
12/31/08
04/20/01
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 118
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
3445 S HERMITAGE AVE
1.0
0 05/15/01
05/15/01
378
100
302 00 0092 / 5774
3449 S HERMITAGE AVE
1.0
0 05/15/01
05/15/01
378
100
302 00 0092 / 5774
3450 S HERMITAGE AVE
1.0
0 05/15/01
05/15/01
378
100
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
0
1,134
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
3.0
Locations
302 00 0076 / 5764
ON S SHIELDS AVE FROM W 28TH PL TO W 31ST ST
04/09/98
04/09/98
0 04/09/98
04/09/98
221
100
300 06 0225 / 5340
ON S WENTWORTH AVE FROM W 33RD ST TO W 37TH ST
05/30/03
06/17/03
3,625 05/30/03
06/17/03
5,285
100
300 06 0225 / 5340
ON W 35TH ST FROM S STEWART AVE TO S WENTWORTH AVE
05/30/03
06/17/03
5,250 05/30/03
06/17/03
3,780
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc
13.0
13.0
8,875
9,286
Blocks
281 00 / 33670
911 W 37TH ST
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
1313 W FULLER ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Strt Lighting 300 06 0261 / 5369
ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE
300 06 0246 / 5356
ON W 41ST ST FROM S HALSTED ST TO S WALLACE ST
300 06 0247 / 5357
700 W 46TH PL
Blocks 3.50
.25
04/01/04
06/30/04
314,566 01/22/04
08/03/04
250,781
100
08/01/03
11/30/03
23,274 07/18/03
10/14/03
23,274
100
06/16/03
06/30/03
32,500 06/12/03
08/05/03
32,201
100
3.75
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
.0
3659 S HALSTED ST
370,340
306,256
Lamps 2,806.0
03/01/04
12/01/04
14,591 07/31/06
09/19/06
30,557
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 119
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2609 / 8795
2495 S ARCHER AVE
24.0
10/09/91
10/09/91
0 10/09/91
10/09/91
18,000
100
805 06 2313 / 8499
3099 S ASHLAND AVE
26.0
01/01/91
01/01/91
0 01/01/91
01/01/91
19,500
100
805 06 2335 / 8521
3905 S ASHLAND AVE
18.0
12/31/91
12/31/91
0 12/31/91
12/31/91
13,500
100
805 06 2724 / 8910
2599 S CORBETT ST
20.0
01/14/91
01/14/91
0 01/14/91
01/14/91
15,000
100
805 06 2292 / 8478
3398 S DAMEN AVE
8.0
01/01/91
01/01/91
0 01/01/91
01/01/91
6,000
100
805 06 2688 / 8874
3399 S DAMEN AVE
14.0
08/16/91
08/16/91
0 08/16/91
08/16/91
10,500
100
805 06 2388 / 8574
3901 S EMERALD AVE
14.0
01/01/90
01/01/90
0 01/01/90
01/01/90
10,500
100
302 00 0071 / 5759
4000 S EMERALD AVE
0 09/07/98
09/14/98
12,802
100
300 06 0099 / 5260
3659 S HALSTED ST
1,187.0
09/09/03
09/24/03
66,718 09/03/03
09/15/03
49,190
100
805 06 2259 / 8445
3901 S HALSTED ST
34.0
12/13/96
12/13/96
0 12/13/96
12/13/96
25,500
100
805 06 2334 / 8520
3901 S HALSTED ST
12.0
01/01/91
01/01/91
0 01/01/91
01/01/91
9,000
100
805 06 2673 / 8859
3499 S HOYNE AVE
10.0
09/20/91
09/20/91
0 09/20/91
09/20/91
7,500
100
805 06 2768 / 8954
3595 S LEAVITT ST
10.0
10/02/91
10/02/91
0 10/02/91
10/02/91
7,500
100
805 06 2272 / 8458
3605 S LEAVITT ST
4.0
01/01/91
01/01/91
0 01/01/91
01/01/91
3,000
100
302 00 0071 / 5759
2820 S LOOMIS ST
0 02/20/99
02/25/99
7,115
100
805 06 2410 / 8596
3900 S NORMAL AVE
0 01/01/90
01/01/90
11,250
100
302 00 0071 / 5759
4000 S NORMAL AVE
0 02/24/99
03/05/99
16,487
100
805 06 2409 / 8595
3901 S UNION AVE
0 01/01/90
01/01/90
10,500
100
302 00 0071 / 5759
4000 S UNION AVE
0 02/26/99
03/05/99
14,813
100
805 06 2411 / 8597
3901 S WALLACE ST
10.0
0 01/01/90
01/01/90
7,500
100
302 00 0072 / 5760
4000 S WALLACE ST
1.0
0 02/21/00
02/25/00
9,600
100
805 06 2867 / 9053
3605 S WESTERN BLVD
7.0
0 01/01/91
01/01/91
5,250
100
302 00 0071 / 5759
400 W 25TH PL
0 06/12/98
06/23/98
20,920
100
805 06 2835 / 9021
135 W 26TH ST
0 10/13/93
10/13/93
6,000
100
302 00 0071 / 5759
400 W 26TH ST
0 05/25/98
06/07/98
41,745
100
805 06 2284 / 8470
401 W 26TH ST
34.0
03/20/94
03/20/94
0 03/20/94
03/20/94
25,500
100
805 06 2283 / 8469
401 W 28TH ST
86.0
06/14/96
06/14/96
0 06/14/96
06/14/96
64,500
100
805 06 2840 / 9026
138 W 29TH ST
8.0
10/07/93
10/07/93
0 10/07/93
10/07/93
6,000
100
805 06 2857 / 9043
405 W 29TH ST
34.0
11/19/93
11/19/93
0 11/19/93
11/19/93
25,500
100
805 06 2148 / 8334
1729 W 31ST PL
5.0
01/01/91
01/01/91
0 01/01/91
01/01/91
3,750
100
805 06 2692 / 8878
125 W 31ST ST
10.0
04/22/94
04/22/94
0 04/22/94
04/22/94
7,500
100
15.0
14.0
8.0
01/01/90
01/01/90
01/01/90
01/01/91
10/13/93
01/01/90
01/01/90
01/01/90
01/01/91
10/13/93
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 120
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2858 / 9044
401 W 32ND ST
54.0
05/01/91
05/01/91
0 05/01/91
05/01/91
40,500
100
805 06 2709 / 8895
1899 W 33RD ST
10.0
07/24/91
07/24/91
0 07/24/91
07/24/91
7,500
100
805 06 2818 / 9004
2001 W 34TH ST
10.0
08/23/91
08/23/91
0 08/23/91
08/23/91
7,500
100
302 00 0071 / 5759
400 W 35TH ST
0 02/24/98
03/12/98
40,902
100
805 06 2860 / 9046
401 W 35TH ST
56.0
06/12/92
06/12/92
0 06/12/92
06/12/92
42,000
100
805 06 2772 / 8958
2101 W 35TH ST
10.0
09/24/91
09/24/91
0 09/24/91
09/24/91
7,500
100
302 00 0071 / 5759
2140 W 35TH ST
0 09/03/98
09/08/98
11,638
100
805 06 2757 / 8943
2301 W 36TH ST
8.0
09/24/91
09/24/91
0 09/24/91
09/24/91
6,000
100
805 06 2861 / 9047
401 W 37TH ST
36.0
12/31/91
12/31/91
0 12/31/91
12/31/91
27,000
100
805 06 2862 / 9048
401 W 38TH ST
34.0
03/01/91
03/01/91
0 03/01/91
03/01/91
25,500
100
805 06 2836 / 9022
498 W 42ND PL
22.0
08/01/91
08/01/91
0 08/01/91
08/01/91
16,500
100
805 06 2739 / 8925
1331 W FULLER ST
18.0
03/01/91
03/01/91
0 03/01/91
03/01/91
13,500
100
805 06 2424 / 8610
405 W PERSHING RD
24.0
12/01/93
12/01/93
0 12/01/93
12/01/93
18,000
100
Totals per Underpass Lighting
1,895.0
66,718
755,462
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 121
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S ARCHER AVE AND S ASHLAND AVE
1.0
210 06 0219 / 4459
S ARCHER AVE AND S DAMEN AVE
1.0
210 06 0130 / 4389
S ARCHER AVE AND S HALSTED ST
1.0
0 01/15/02
01/18/02
13,974
100
210 06 0130 / 4389
S ARCHER AVE AND S THROOP ST
1.0
0 09/05/01
09/05/01
8,539
100
210 06 0130 / 4389
S ARCHER AVE AND S WOOD ST
1.0
0 01/17/02
01/17/02
8,539
100
210 06 0130 / 4389
S CANAL ST AND W 26TH ST
1.0
0 05/07/02
05/07/02
8,539
100
210 06 0130 / 4389
S LA SALLE ST AND W 31ST ST
1.0
0 04/10/02
04/10/02
7,078
100
210 06 0130 / 4389
S LOCK ST AND S ARCHER AVE
1.0
0 09/04/01
09/04/01
8,539
100
210 06 0130 / 4389
S UNION AVE AND W 26TH ST
1.0
0 05/08/02
05/08/02
6,867
100
210 06 0130 / 4389
S WALLACE ST AND W 26TH ST
1.0
0 05/15/02
05/15/02
8,539
100
210 06 0130 / 4389
S WALLACE ST AND W 31ST ST
1.0
0 01/31/02
01/31/02
15,228
100
210 06 0130 / 4389
S WENTWORTH AVE AND W 31ST ST
1.0
0 04/10/02
04/10/02
7,078
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
0 01/14/02 04/11/05
04/11/05
12.0
01/14/02
10,563
9,507
100
0
10,563
102,427
Locations
210 06 0127 / 4386
S HALSTED ST AND W PERSHING RD
.0
10/01/07
12/31/07
85,000
101,236
50
210 06 0171 / 4420
W 35TH ST AND S DAMEN AVE
.0
03/01/07
12/31/07
0
0
0
85,000
101,236
Totals per Left Turn Arrow
Work Type: New Signal 300 06 0283 / 5391
S HALSTED ST AND W 31ST ST
Work Type: Removal Temp Wiring - Signals
.0
Locations 1.0
09/02/04
09/30/04
03/20/01
04/20/01
11,341 09/09/04
09/09/04
11,341
100
8,000 06/05/01
06/06/01
3,590
100
4,000 03/22/01
04/06/01
6,489
100
4,000 04/12/01
04/08/02
180
100
Crossings
300 06 0197 / 5322
S DAMEN AVE AND W 37TH ST
2.0
300 06 0197 / 5322
S HALSTED ST AND W 43RD ST
1.0
300 06 0197 / 5322
S UNION AVE AND W ROOT ST
1.0
300 06 0197 / 5322
W 26TH ST AND S HALSTED ST
1.0
03/20/01
04/20/01
4,000 03/20/01
04/10/01
7,700
100
300 06 0197 / 5322
W 26TH ST AND S WENTWORTH AVE
1.0
04/20/01
04/26/01
4,000 04/20/01
04/26/01
2,672
100
Totals per Removal Temp Wiring - Signals Totals per Traffic
6.0
24,000
20,631
446,404
926,059
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 122
1/1/2008 AND 12/31/2008
Ward 11 James A. Balcer CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Signals 300 06 0096 / 5258
3659 S HALSTED ST
Work Type: TSM Install
Intersections 72.0
08/19/03
08/26/03
0 09/08/03
11/10/03
11,385
100
Locations
210 06 0025 / 4299
3600 S ARCHER AVE
1.0
08/01/98
10/01/98
150,000 11/11/98
02/03/99
131,974
100
814 06 0168 / 16380
3100 S EMERALD AVE
1.0
08/12/97
10/22/97
0 08/12/97
10/22/97
200,000
100
814 06 0089 / 16305
2500 S HALSTED ST
1.0
12/07/93
12/07/93
0 12/07/93
12/07/93
47,111
100
814 06 0058 / 16274
3000 S HALSTED ST
1.0
04/03/95
04/03/95
0 04/03/95
04/03/95
150,729
100
210 06 0057 / 4324
3400 S HALSTED ST
1.0
11/15/98
12/31/98
150,000 12/16/98
02/25/99
88,789
100
210 06 0074 / 4338
600 W 26TH ST
1.0
05/01/02
08/01/02
15,500 04/12/02
05/17/02
60,436
100
Totals per TSM Install
6.0
315,500
679,039
Totals per Construction Phase
4,298,954
5,127,309
Totals for Ward 11
4,387,815
5,135,899
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 123
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32456
LAWNDALE GARDENS
300 06 / 32146
Additional lighting on California side due to wide parkway-sidewalk. It will be a continuation of lighting north of 25th Street Note Last Updated on 11-FEB-08 ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR 05/01/07 10/31/07 16,000 08/17/07 1.0
300 09 / 33078
ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD
.0
01/01/08
05/30/08
0 04/01/08
300 06 0308 / 5414
ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST
.0
02/01/06
07/31/06
300 06 / 32129
ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
.0
11/27/06
02/14/07
300 06 / 32277
ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE
.0
04/01/08
08/30/08
300 06 0292 / 5399
W 38TH ST AND S ARCHER AVE
300 09 / 33078
3819 S CAMPBELL AVE
.0
01/01/08
300 06 0282 / 5390
3030 S KEDZIE AVE
1.0
09/03/04
300 06 0292 / 5399
4555 S WESTERN BLVD
1.0
300 06 0292 / 5399
2320 W 47TH ST
1.0
04/22/05
04/26/05
Totals per Design/Engineering
Work Type: Feasibility Study 302 00 0079 / 5767
ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE
Totals per Lighting/Electrical
.0
04/02/07
03/12/08
30,000 01/07/08
0
5
09/26/07
5,200
100
12/01/08
0
0
0 02/01/06
07/31/06
2,315
100
3,700 11/27/06
02/14/07
2,414
100
0
0
0
0
100
1,000 05/12/05
05/13/05
05/30/08
0 04/01/08
12/01/08
0
0
10/22/04
1,000 10/01/04
10/22/04
1,488
100
3,500 05/26/05
08/10/05
3,361
100
2,000 04/22/05
04/26/05
1,749
100
1.0
5.0
57,200
16,527
Projects .0
10/25/01
10/25/01
0 10/25/01 57,200
10/25/01
0 16,527
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 124
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 03 0012 / 4883
ON S ALBANY AVE FROM W 24TH ST TO W 25TH ST
10.0
10/01/04
10/10/04
3,905 10/08/04
10/19/04
2,236
100
300 06 0122 / 5275
ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD
9.20
08/01/04
08/15/04
3,634 06/14/04
06/22/04
2,505
100
300 06 0069 / 5233
ON S CALIFORNIA AVE FROM W 43RD ST TO W 47TH ST
60.0
10/04/02
10/22/02
24,000 10/01/02
10/18/02
12,463
100
300 06 0069 / 5233
ON S CAMPBELL AVE FROM W 40TH ST TO W 42ND ST
12.0
07/18/02
07/18/02
2,520 07/15/02
07/15/02
2,436
100
300 11 / 32201
ON S FAIRFIELD AVE FROM W 42ND ST TO W 44TH ST
13.0
11/01/07
11/20/07
5,200 10/11/07
10/11/07
2,500
100
300 06 0122 / 5275
ON S FAIRFIELD AVE FROM W 45TH ST TO W 47TH ST
03/13/03
03/13/03
2,940 03/10/03
03/10/03
2,940
100
300 06 0122 / 5275
ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD
3.0
08/01/04
08/15/04
1,125 06/15/04
06/21/04
919
100
300 06 0122 / 5275
ON S HOMAN AVE FROM W 37TH ST TO W PERSHING RD
9.0
08/01/04
08/15/04
3,375 06/15/04
06/21/04
2,502
100
300 06 0122 / 5275
ON S HOYNE AVE FROM W 47TH ST TO W 49TH ST
10.0
03/14/03
03/14/03
2,030 03/11/03
03/11/03
2,100
100
300 11 / 32201
ON S MAPLEWOOD AVE FROM W 40TH ST TO W 44TH ST
25.0
11/01/07
11/20/07
10,400 10/11/07
10/11/07
2,500
100
300 06 0069 / 5233
ON S MOZART ST FROM W 43RD ST TO W 47TH ST
30.0
10/04/02
10/22/02
12,000 10/01/02
10/18/02
6,232
100
300 06 0122 / 5275
ON S MOZART ST FROM W 45TH ST TO W 47TH ST
4.50
03/15/03
03/15/03
914 03/12/03
03/12/03
945
100
300 06 0122 / 5275
ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST
8.0
03/15/03
03/15/03
1,624 03/12/03
03/12/03
1,680
100
300 11 / 32201
ON S ROCKWELL ST FROM W 45TH ST TO W 47TH ST
29.0
11/01/07
11/15/07
12,000 10/04/07
10/12/07
12,000
100
300 03 0012 / 4883
ON S SACRAMENTO AVE FROM W 24TH ST TO W 25TH ST
10.0
10/01/04
10/10/04
3,910 10/08/04
10/19/04
2,237
100
300 06 0122 / 5275
ON S SPAULDING AVE FROM W 37TH PL TO W 38TH ST
3.0
06/21/04
06/25/04
1,125 06/15/04
06/21/04
1,172
100
300 11 / 32201
ON S TALMAN AVE FROM W 42ND ST TO W 44TH ST
12.0
11/01/07
11/15/07
4,800 10/11/07
10/11/07
2,500
100
300 06 0122 / 5275
ON S TALMAN AVE FROM W 45TH ST TO W 47TH ST
9.0
03/15/03
03/15/03
1,827 03/12/03
03/12/03
1,890
100
300 03 0012 / 4883
ON S TROY ST FROM W 24TH ST TO W 25TH ST
2.50
10/01/04
10/10/04
975 10/08/04
10/19/04
559
100
300 06 0122 / 5275
ON S WASHTENAW AVE FROM W 45TH ST TO W 47TH ST
9.0
03/15/03
03/15/03
1,827 03/12/03
03/12/03
1,890
100
300 03 0012 / 4883
ON S WHIPPLE ST FROM W 24TH ST TO W 25TH ST
5.0
10/01/04
10/10/04
1,950 10/08/04
10/19/04
1,118
100
300 03 0012 / 4883
ON W 24TH ST FROM S TROY ST TO S MARSHALL BLVD
5.0
10/01/04
10/10/04
1,950 10/08/04
10/19/04
1,117
100
300 03 0012 / 4883
ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE
4.15
10/01/04
10/10/04
1,619 10/08/04
10/19/04
928
100
300 06 0122 / 5275
ON W 36TH PL FROM S FRANCISCO AVE TO S ALBANY AVE
9.0
08/01/04
08/15/04
3,375 06/15/04
06/21/04
2,502
100
300 06 0122 / 5275
ON W 36TH ST FROM S FRANCISCO AVE TO S ALBANY AVE
15.0
08/01/04
08/15/04
6,025 06/15/04
06/21/04
3,832
100
300 06 0122 / 5275
ON W 38TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE
9.0
08/01/04
08/15/04
3,375 06/15/04
06/21/04
2,502
100
300 06 0069 / 5233
3000 S ALBANY AVE
2.0
04/08/02
04/08/02
420 04/05/02
04/05/02
406
100
300 06 0122 / 5275
3301 S BELL AVE
2.0
11/01/03
11/01/03
862 11/05/03
11/05/03
400
100
300 06 0069 / 5233
4200-4259 S CAMPBELL AVE
5.0
0 07/15/02
07/15/02
1,875
100
300 06 0122 / 5275
3301 S CLAREMONT AVE
2.0
10/25/03
10/25/03
862 11/05/03
11/05/03
400
100
300 06 0122 / 5275
3301 S HAMILTON AVE
3.0
11/01/03
11/01/03
1,291 11/05/03
11/05/03
586
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 125
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
4501 S HERMITAGE AVE
2.0
300 06 0122 / 5275
3359 S LEAVITT ST
3.0
302 00 0092 / 5774
4401 S MARSHFIELD AVE
2.0
300 06 0122 / 5275
3300 S OAKLEY AVE
6.0
11/01/03
300 06 0122 / 5275
3359 S OAKLEY AVE
2.0
302 00 0092 / 5774
4124 S ROCKWELL ST
300 06 0122 / 5275
0 02/23/01
02/23/01
413
100
1,291 11/05/03
11/05/03
587
100
0 02/23/01
02/23/01
413
100
11/01/03
1,260 02/20/03
02/20/03
1,218
100
11/01/03
11/01/03
862 11/05/03
11/05/03
400
100
1.0
10/06/01
10/06/01
206 09/29/01
09/29/01
206
100
3301 S WESTERN AVE
3.0
11/01/03
11/01/03
1,291 11/05/03
11/05/03
400
100
300 06 0122 / 5275
2800 W 21ST PL
6.0
03/15/03
03/15/03
1,218 03/12/03
03/12/03
1,260
100
300 06 0122 / 5275
2800 W 25TH ST
2.0
03/28/03
03/28/03
406 03/25/03
03/25/03
420
100
300 06 0122 / 5275
2400 W 34TH PL
5.0
03/15/03
03/15/03
1,015 03/12/03
03/12/03
1,050
100
300 06 0122 / 5275
2400 W 34TH ST
6.0
03/14/03
03/14/03
1,260 03/11/03
03/11/03
1,218
100
300 06 0069 / 5233
3500 W 38TH PL
5.0
10/12/02
10/12/02
1,050 10/09/02
10/09/02
1,015
100
300 06 0122 / 5275
1700 W 45TH ST
3.0
02/23/03
02/23/03
630 03/20/03
03/20/03
609
100
302 00 0092 / 5774
2605-2639 W MONTGOMERY AVE
4.0
10/06/01
10/06/01
824 09/29/01
09/29/01
824
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
11/01/03
11/01/03
379.35
133,172
89,904
Fixtures
300 05 0012 / 5127
ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST
68.0
04/04/05
11/18/05
27,200
300 05 0012 / 5127
ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD
65.0
04/04/05
11/18/05
26,000 06/01/05
06/20/05
14,990
100
300 06 0122 / 5275
ON S KEDZIE AVE FROM W 36TH ST TO W PERSHING RD
36.0
06/21/04
06/25/04
14,400 06/15/04
06/21/04
7,472
100
300 07 0012 / 5435
ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST
54.0
11/15/06
11/29/06
21,600 10/20/06
11/09/06
10,908
100
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
47.52
05/10/04
06/10/04
19,008 05/01/04
05/11/04
18,321
100
302 00 0092 / 5774
ON W 47TH ST FROM S WESTERN AVE TO S ROCKWELL ST
14.0
03/14/02
03/14/02
5,600 03/11/02
03/11/02
5,250
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
284.52
0
113,808
56,941
2,551,954
2,132,614
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 126
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0709 / 6895
3959 S ARCHER AVE
1.0
03/13/95
03/13/95
0 03/13/95
03/13/95
300
100
805 06 1549 / 7735
4136 S ARTESIAN AVE
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 0798 / 6984
4011 S BRIGHTON PL
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 0800 / 6986
3759 S CALIFORNIA AVE
1.0
05/24/96
05/24/96
0 05/24/96
05/24/96
300
100
805 06 0801 / 6987
3821 S CALIFORNIA AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 0802 / 6988
4133 S CALIFORNIA AVE
1.0
04/16/96
04/16/96
0 04/16/96
04/16/96
300
100
805 06 1883 / 8069
3641 S MAPLEWOOD AVE
1.0
07/29/96
07/29/96
0 07/29/96
07/29/96
300
100
805 06 1953 / 8139
4053 S MONTGOMERY AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0669 / 6855
4014 S ROCKWELL ST
1.0
03/17/95
03/17/95
0 03/17/95
03/17/95
300
100
805 06 0699 / 6885
4030 S ROCKWELL ST
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0696 / 6882
4108 S ROCKWELL ST
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 0687 / 6873
4118 S ROCKWELL ST
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 1708 / 7894
3748 S SACRAMENTO AVE
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
805 06 0486 / 6672
3502 S WASHTENAW AVE
1.0
08/22/95
08/22/95
0 08/22/95
08/22/95
300
100
805 06 0504 / 6690
3734 S WASHTENAW AVE
1.0
10/17/95
10/17/95
0 10/17/95
10/17/95
300
100
805 06 0383 / 6569
3739 S WASHTENAW AVE
1.0
05/24/96
05/24/96
0 05/24/96
05/24/96
300
100
805 06 0525 / 6711
3801 S WASHTENAW AVE
1.0
05/24/96
05/24/96
0 05/24/96
05/24/96
300
100
805 06 0506 / 6692
3824 S WASHTENAW AVE
1.0
03/19/96
03/19/96
0 03/19/96
03/19/96
300
100
300 06 0139 / 5289
4650 S WESTERN AVE
933.0
03/01/06
09/01/06
23,522 02/15/06
03/01/06
28,190
100
805 06 0520 / 6706
4722 S WESTERN AVE
1.0
01/18/95
01/18/95
0 01/18/95
01/18/95
300
100
805 06 0966 / 7152
3126 W 26TH ST
1.0
11/03/95
11/03/95
0 11/03/95
11/03/95
300
100
805 06 1767 / 7953
2731 W 35TH PL
1.0
05/14/97
05/14/97
0 05/14/97
05/14/97
300
100
805 06 0892 / 7078
2642 W 36TH ST
1.0
10/17/95
10/17/95
0 10/17/95
10/17/95
300
100
805 06 0894 / 7080
2717 W 38TH PL
1.0
01/24/96
01/24/96
0 01/24/96
01/24/96
300
100
805 06 0895 / 7081
2745 W 38TH PL
1.0
01/24/96
01/24/96
0 01/24/96
01/24/96
300
100
805 06 0893 / 7079
2856 W 38TH PL
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
302 00 0092 / 5774
2456 W 38TH ST
38.0
0 02/20/01
12/13/01
8,955
100
805 06 0899 / 7085
2622 W 38TH ST
1.0
03/19/96
03/19/96
0 03/19/96
03/19/96
300
100
805 06 0900 / 7086
2825 W 38TH ST
1.0
01/24/96
01/24/96
0 01/24/96
01/24/96
300
100
805 06 1707 / 7893
3014 W 38TH ST
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
805 06 0871 / 7057
2631 W 39TH PL
1.0
03/17/95
03/17/95
0 03/17/95
03/17/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 127
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0891 / 7077
2705 W 39TH PL
1.0
03/17/95
03/17/95
0 03/17/95
03/17/95
300
100
805 06 0929 / 7115
2716 W 39TH PL
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 0889 / 7075
2640 W 42ND ST
1.0
09/14/95
09/14/95
0 09/14/95
09/14/95
300
100
805 06 0922 / 7108
2642 W 42ND ST
1.0
10/09/96
10/09/96
0 10/09/96
10/09/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
2458 W 38TH ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2456 W 38TH ST
Work Type: Flood Light Install
1,004.0
23,522
47,045
Lamps 1,738.0
06/01/07
12/31/07
51,166 09/01/07
10/04/07
49,619
100
0 06/27/02
06/30/02
29,916
100
Installations 1,643.0
Fixtures
300 06 0069 / 5233
ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
3.75
1,406 06/24/02
06/24/02
1,406
100
300 06 0167 / 5306
ON W 45TH ST FROM S WESTERN AVE TO S ROCKWELL ST
17.0
0 05/19/99
05/19/99
3,008
100
302 00 0092 / 5774
S DAMEN AVE AND W 48TH ST
.50
0 09/25/01
09/25/01
202
100
300 11 / 32201
3823 S CALIFORNIA AVE
1.0
500 10/10/07
10/10/07
507
100
300 06 0167 / 5306
3800 S SACRAMENTO AVE
1.0
0 12/08/99
12/08/99
351
100
300 06 0167 / 5306
3542 S WASHTENAW AVE
1.0
0 01/09/99
01/09/99
351
100
300 11 / 32201
3843 S WASHTENAW AVE
1.0
500 10/10/07
10/10/07
507
100
300 06 0167 / 5306
2700 W 38TH PL
1.0
0 12/08/99
12/08/99
351
100
300 11 / 32201
2809 W 38TH PL
1.0
11/10/07
11/11/07
500 10/10/07
10/10/07
507
100
300 11 / 32201
2813 W 38TH PL
1.0
11/10/07
11/11/07
500 10/10/07
10/10/07
507
100
300 11 / 32201
2814 W 38TH PL
1.0
11/10/07
11/11/07
500 10/10/07
10/10/07
507
100
300 06 0167 / 5306
3000 W 38TH PL
1.0
0 12/08/99
12/08/99
351
100
Totals per Flood Light Install
30.25
11/01/07
11/01/07
11/10/07
11/10/07
3,906
8,555
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 128
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts
Installations
300 06 0292 / 5399
4555 S WESTERN BLVD
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
Not issued Note Last Updated on 01-NOV-07 2320 W 47TH ST
.0
03/01/05
12/31/05
19,586 09/20/05
09/20/05
175,200
100
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts
.0
19,586
Projects
300 06 / 32456
LAWNDALE GARDENS
.0
04/02/07
12/31/08
300 06 0282 / 5390
3030 S KEDZIE AVE
.0
10/06/04
10/31/04
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
175,200
.0
300,000 5,800 10/27/04
10/27/04
305,800
0
0
5,709
100
5,709
Fixtures
300 05 0012 / 5127
ON S CALIFORNIA AVE FROM W 24TH ST TO W 31ST ST
50.0
04/04/05
11/18/05
67,500
300 05 0012 / 5127
ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD
57.0
04/04/05
11/18/05
76,950 06/01/05
06/28/05
73,801
100
300 06 0069 / 5233
ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE
29.0
12/20/02
01/09/03
36,250 12/28/02
02/28/03
35,049
100
300 07 0012 / 5435
ON W 26TH ST FROM S ROCKWELL ST TO S KEDZIE AVE
54.0
11/15/06
11/29/06
72,900 10/20/06
11/09/06
57,212
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 300 09 / 33090
ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD
Work Type: Residential Regrouping 300 06 0270 / 5378
2458 W 38TH ST
190.0
0
253,600
166,062
Blocks 50,000 04/01/08
.50
12/01/08
0
0
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 129
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Staggered Lighting 300 06 / 32146
ON S ARTESIAN AVE FROM W PERSHING RD TO W POPE JOHN PAUL II DR
4.0
12/05/07
06/26/08
336,375
0
25
300 07 0012 / 5435
ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 25TH ST
1.0
10/01/06
12/01/06
100,000 07/19/06
09/28/06
0
100
300 11 / 32201
ON S CAMPBELL AVE FROM W 42ND ST TO W POPE JOHN PAUL II DR
1.0
06/28/07
09/21/07
75,000 06/28/07
09/07/07
60,317
100
300 11 / 32201
ON S CAMPBELL AVE FROM W PERSHING RD TO W 40TH ST
1.0
06/28/07
09/21/07
75,000 06/28/07
09/07/07
60,317
100
300 11 / 32201
ON S MARSHALL BLVD FROM W CERMAK RD TO W 23RD ST
3.0
05/17/07
05/21/07
30,000 05/17/07
05/23/07
4,509
100
300 07 0014 / 5437
ON S MOZART ST FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 06 0308 / 5414
ON S ROCKWELL ST FROM W POPE JOHN PAUL II DR TO W 45TH ST
2.0
07/07/06
09/01/06
152,756 07/24/06
10/06/06
106,951
100
300 06 / 32129
ON W 25TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
2.0
02/15/07
05/31/07
184,280 02/15/07
05/31/07
112,252
100
300 06 / 32277
ON W 38TH ST FROM S HOMAN AVE TO S SACRAMENTO AVE
.0
05/04/08
12/31/08
300 11 / 32201
ON W 39TH PL FROM S CAMPBELL AVE TO S ROCKWELL ST
1.0
06/28/07
09/21/07
300 07 0011 / 5434
2415 W 46TH PL
.0
03/01/06
12/31/06
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON S SEELEY AVE FROM W 47TH ST TO W 49TH ST
Work Type: Short Arm Installs - Arterial
15.0
0
0
0
36,740
100
0
0
0
1,013,411
381,086
60,000 06/28/07
09/07/07
Blocks 2.0
08/01/03
10/01/03
147,124 07/29/03
10/03/03
131,010
100
Locations
302 00 0092 / 5774
4330 S HERMITAGE AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4317 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4439 S MARSHFIELD AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4317 S PAULINA ST
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
2433 W 45TH PL
1.0
0 03/16/01
03/16/01
378
100
302 00 0092 / 5774
2461 W 45TH PL
1.0
0 03/16/01
03/16/01
378
100
6.0
0
Totals per Short Arm Installs - Arterial
2,268
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 130
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 05 0012 / 5127
ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD
57.0
04/04/05
11/18/05
14,250 10/20/05
10/20/05
12,001
100
300 03 0012 / 4883
ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL
39.56
07/01/04
07/20/04
10,406 07/10/04
08/01/04
8,991
100
300 04 0216 / 5114
ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST
15.50
05/01/06
11/01/06
3,317 05/17/06
10/01/06
3,317
100
300 07 0012 / 5435
ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST
54.0
11/17/05
04/03/06
13,500 05/20/06
06/01/06
9,428
100
302 00 0077 / 5765
ON W 42ND ST FROM S TALMAN AVE TO S FAIRFIELD AVE
0 06/17/99
06/17/99
175
100
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
300 04 0216 / 5114
ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD
302 00 0079 / 5767
ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE
302 00 0077 / 5765
4037 S ARCHER AVE
302 00 0076 / 5764
3700-6700 S CALIFORNIA AVE
302 00 0077 / 5765
2825 W 42ND ST
1.0
0 06/16/99
06/16/99
87
100
302 00 0077 / 5765
2700 W PERSHING RD
4.0
0 07/27/99
07/27/99
349
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 03 0012 / 4883
ON W 35TH ST FROM S DAMEN AVE TO S WESTERN AVE
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
51.48
06/01/04
06/21/04
13,580 05/11/04
06/30/04
14,609
100
16.0
05/01/06
11/01/06
3,461 05/17/06
08/30/06
3,461
100
39.06
09/01/02
09/03/02
4,898 09/09/02
10/23/02
4,898
100
0 06/17/99
06/17/99
87
100
1.0 237.0
4650 S WESTERN AVE
09/01/00
12/31/00
517.60
0
4,029
63,411
61,431
Blocks
2400 S MARSHALL BLVD
Work Type: Strt Lighting 300 06 0261 / 5369
2.0
11/01/04
11/10/04
5,000 03/17/05
03/17/05
0
100
04/01/04
06/30/04
314,566 01/22/04
08/03/04
250,781
100
03/01/04
12/01/04
9,308 07/31/06
09/21/06
19,493
100
Blocks 3.50
Lamps 1,790.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 131
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
302 00 0072 / 5760
4050 S ASHLAND AVE
0 02/25/00
03/15/00
14,456
100
805 06 2163 / 8349
3101 S CALIFORNIA AVE
16.0
06/18/93
06/18/93
0 06/18/93
06/18/93
12,000
100
805 06 2490 / 8676
3495 S CALIFORNIA AVE
6.0
12/19/95
12/19/95
0 12/19/95
12/19/95
4,500
100
805 06 2491 / 8677
3299 S KEDZIE AVE
4.0
10/20/95
10/20/95
0 10/20/95
10/20/95
3,000
100
805 06 2785 / 8971
1901 S MARSHALL BLVD
10.0
04/05/93
04/05/93
0 04/05/93
04/05/93
7,500
100
805 06 2518 / 8704
3631 S ROCKWELL ST
4.0
12/08/92
12/08/92
0 12/08/92
12/08/92
3,000
100
302 00 0071 / 5759
3700 S ROCKWELL ST
0 02/06/99
02/11/99
10,473
100
805 06 2813 / 8999
3631 S WASHTENAW AVE
0 04/25/94
04/25/94
7,500
100
302 00 0070 / 5758
3120 S WESTERN AVE
0 01/03/98
01/15/98
14,044
100
302 00 0070 / 5758
3140 S WESTERN AVE
0 01/03/98
01/15/98
12,751
100
805 06 2156 / 8342
3199 S WESTERN AVE
8.0
12/31/91
12/31/91
0 12/31/91
12/31/91
6,000
100
805 06 2145 / 8331
3200 S WESTERN AVE
8.0
12/31/91
12/31/91
0 12/31/91
12/31/91
6,000
100
805 06 2425 / 8611
3301 S WESTERN AVE
48.0
12/31/91
12/31/91
0 12/31/91
12/31/91
36,000
100
302 00 0072 / 5760
3650 S WESTERN AVE
1.0
0 02/29/00
03/08/00
10,000
100
302 00 0071 / 5759
3900 S WESTERN AVE
0 05/10/99
07/01/99
113,750
100
805 06 2190 / 8376
3901 S WESTERN AVE
14.0
12/31/95
12/31/95
0 12/31/95
12/31/95
10,500
100
805 06 2959 / 9145
3901 S WESTERN AVE
34.0
10/16/91
10/16/91
0 10/16/91
10/16/91
25,500
100
805 06 2960 / 9146
3901 S WESTERN AVE
14.0
10/16/91
10/16/91
0 10/16/91
10/16/91
10,500
100
805 06 2294 / 8480
4901 S WESTERN AVE
5.0
01/01/91
01/01/91
0 01/01/91
01/01/91
3,750
100
302 00 0070 / 5758
3130 S WESTERN BLVD
0 01/03/98
01/15/98
13,738
100
302 00 0072 / 5760
3640 S WESTERN BLVD
0 02/21/00
02/29/00
10,000
100
302 00 0071 / 5759
3900 S WESTERN BLVD
0 06/15/99
07/01/99
66,940
100
805 06 2953 / 9139
2505 W 26TH ST
14.0
03/20/94
03/20/94
0 03/20/94
03/20/94
10,500
100
805 06 2954 / 9140
2505 W 26TH ST
26.0
03/20/94
03/20/94
0 03/20/94
03/20/94
19,500
100
805 06 2181 / 8367
2400 W 31ST BLVD
4.0
04/02/93
04/02/93
0 04/02/93
04/02/93
3,000
100
805 06 2214 / 8400
2400 W 31ST BLVD
8.0
04/06/93
04/06/93
0 04/06/93
04/06/93
6,000
100
302 00 0070 / 5758
2500 W 31ST ST
0 01/28/98
02/05/98
16,290
100
302 00 0070 / 5758
2520 W 31ST ST
0 01/08/98
01/15/98
3,270
100
805 06 2517 / 8703
2431 W 36TH ST
12.0
01/01/91
01/01/91
0 01/01/91
01/01/91
9,000
100
300 06 0099 / 5260
2456 W 38TH ST
793.0
09/25/03
10/06/03
44,574 09/16/03
09/23/03
29,982
100
805 06 2447 / 8633
3505 W 38TH ST
12.0
05/14/93
05/14/93
0 05/14/93
05/14/93
9,000
100
1.0
10.0
04/25/94
04/25/94
1.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 132
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2458 / 8644
2399 W 43RD ST
13.0
11/14/95
11/14/95
0 11/14/95
11/14/95
9,750
100
805 06 2475 / 8661
2399 W 43RD ST
27.0
11/14/95
11/14/95
0 11/14/95
11/14/95
20,250
100
805 06 2588 / 8774
2295 W 47TH ST
26.0
05/12/95
05/12/95
0 05/12/95
05/12/95
19,500
100
805 06 2389 / 8575
1605 W PERSHING RD
48.0
11/02/95
11/02/95
0 11/02/95
11/02/95
36,000
100
805 06 2383 / 8569
2027 W PERSHING RD
25.0
08/15/95
08/15/95
0 08/15/95
08/15/95
18,750
100
805 06 2188 / 8374
2399 W PERSHING RD
22.0
12/31/95
12/31/95
0 12/31/95
12/31/95
16,500
100
805 06 2191 / 8377
2399 W PERSHING RD
10.0
12/31/95
12/31/95
0 12/31/95
12/31/95
7,500
100
302 00 0071 / 5759
2400 W PERSHING RD
0 06/17/99
07/01/99
20,900
100
Totals per Underpass Lighting
1,224.0
44,574
657,594
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 133
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
ON W 43RD ST FROM S WESTERN AVE TO S WESTERN BLVD
2.0
0 09/19/02
09/19/02
12,095
100
210 06 0130 / 4389
ON W 47TH ST FROM S WESTERN AVE TO S WESTERN BLVD
2.0
0 09/17/02
09/17/02
17,806
100
210 06 0130 / 4389
S CALIFORNIA AVE AND W 42ND ST
.50
0 08/27/01
08/27/01
3,662
100
210 06 0219 / 4459
S WESTERN AVE AND S ARCHER AVE
1.0
05/09/05
05/10/05
10,563 03/17/05
03/17/05
8,008
100
210 06 0219 / 4459
S WESTERN AVE AND W 35TH ST
1.0
05/06/05
05/07/05
10,563 04/22/05
04/22/05
7,883
100
210 06 0219 / 4459
S WESTERN AVE AND W 44TH ST
1.0
04/13/05
04/13/05
10,563 04/08/05
04/08/05
8,937
100
210 06 0219 / 4459
S WESTERN AVE AND W 45TH ST
1.0
05/10/05
05/11/05
10,563 04/21/05
04/21/05
8,007
100
Totals per LED Signal Head Install
Work Type: New Signal 210 06 0075 / 4339
W 31ST ST AND S SACRAMENTO AVE
210 06 0139 / 4397
3600 S CALIFORNIA AVE
Work Type: Removal Temp Wiring - Signals W 28TH ST AND S KEDZIE AVE
Work Type: Signals 300 06 0096 / 5258
42,252
2829 W CERMAK RD
Work Type: TSM Install
66,398
Locations 1.0
10/01/04
12/01/04
185,500 07/19/04
09/08/04
140,683
100
07/01/03
08/25/03
200,000 06/02/03
08/21/03
188,311
100
1.0
Totals per New Signal
300 06 0197 / 5322
8.50
385,500
328,994
Crossings .50
2,000 06/19/01
08/01/01
153
100
Intersections 44.0
09/01/03
09/07/03
0 09/02/03
09/09/03
6,957
100
Locations
814 06 0072 / 16288
2599 S ALBANY AVE
1.0
02/10/95
02/10/95
0 02/10/95
02/10/95
101,827
100
814 06 0164 / 16376
4300 S ASHLAND AVE
1.0
06/06/97
08/18/97
0 06/06/97
08/18/97
200,000
100
814 06 0392 / 16580
2500 S CALIFORNIA AVE
1.0
03/01/96
03/01/96
0 03/01/96
03/01/96
125,000
100
814 06 0393 / 16581
2500 S CALIFORNIA BLVD
1.0
03/01/96
03/01/96
0 03/01/96
03/01/96
125,000
100
814 06 0085 / 16301
4700 S HOYNE AVE
1.0
03/01/90
03/01/90
0 03/01/90
03/01/90
141,561
100
814 06 0191 / 16403
4700 S ROCKWELL ST
1.0
08/18/95
08/18/95
0 08/18/95
08/18/95
125,000
100
814 06 0188 / 16400
2600 W 31ST ST
1.0
03/22/95
03/22/95
0 03/22/95
03/22/95
125,000
100
Totals per TSM Install Totals per Traffic
7.0
0
943,388
438,252
1,352,436
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 134
1/1/2008 AND 12/31/2008
Ward 12 George A. Cardenas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 05 0012 / 5127
ON S CALIFORNIA BLVD FROM W 24TH BLVD TO W 31ST BLVD
13.0
04/04/05
11/18/05
5,300 10/20/05
10/20/05
4,799
100
300 07 0012 / 5435
ON W 26TH ST FROM S KEDZIE AVE TO S ROCKWELL ST
10.0
11/17/05
04/03/06
3,200 05/20/06
06/01/06
1,747
100
23.0
8,500
6,546
Totals per Construction Phase
2,990,206
3,485,050
Totals for Ward 12
3,047,406
3,501,577
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 135
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32969
ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST
300 06 / 32146
ON S KEELER AVE FROM W 59TH ST TO W 63RD ST
300 06 0308 / 5414 300 06 / 32050
Projects .0
10/17/07
11/30/07
1.0
05/01/07
10/31/07
ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST
.0
02/01/06
ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE
.0
04/15/06
300 06 / 32050
ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD
.0
210 06 0127 / 4386
S KILDARE AVE AND W MARQUETTE RD
210 06 0127 / 4386
0
0
0
4,811
100
07/31/06
958
100
04/15/06
4,519
100
10/26/06
3,620
100
3,900 06/21/07
07/19/07
07/31/06
0 02/01/06
04/15/06
6,000 04/15/06
04/15/06
04/15/06
5,400 11/02/06
.0
12/15/05
03/15/06
W 55TH ST AND S KILBOURN AVE
.50
11/01/06
11/20/06
2,500 01/17/07
300 06 0296 / 5403
W 63RD PL AND S PULASKI RD
1.0
01/20/05
12/21/05
0 01/20/05
210 06 0187 / 4432
W 63RD ST AND S LATROBE AVE
.50
11/15/03
02/15/04
0 11/15/03
300 06 0292 / 5399
6255 S AUSTIN AVE
1.0
300 06 / 32275
6300-6500 S KEELER AVE
.0
03/01/07
300 06 / 32050
6500-6700 S KEELER AVE
.0
300 06 / 32050
4000 W 70TH ST
.0
Totals per Design/Engineering
4.0
0
0
0
1,593
15
12/21/05
780
100
02/15/04
2,063
100
1,000 12/10/04
02/22/05
603
100
10/31/07
3,900 01/30/07
02/27/07
2,520
100
04/15/06
10/31/06
0 04/15/06
10/31/06
1,999
100
04/15/06
10/31/06
0 04/15/06
07/07/06
1,807
100
22,700
25,273
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 136
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
6500 S PULASKI RD
694,780 07/01/02
10/11/02
554,387
100
302 00 0092 / 5774
3800-3899 W 63RD PL
4.0
0 09/25/01
09/25/01
823
100
302 00 0092 / 5774
3900-3999 W 63RD PL
5.0
0 09/25/01
09/25/01
1,029
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
2,081.0
07/01/02
2,090.0
694,780
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
300 06 0069 / 5233
ON S PULASKI RD FROM W 55TH ST TO W 83RD ST
300 06 0122 / 5275
ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE
70.0
07/10/03
300 06 0069 / 5233
ON W 63RD ST FROM S LAWNDALE AVE TO S KARLOV AVE
88.0
10/01/02
300 06 / 33438
6200-6300 S CENTRAL AVE
11.0
06/30/08
Totals per Lighting/Electrical
556,239
Fixtures
300 11 / 32202
Totals per 400 Watt Changeout
10/31/02
30.15
12/01/07
01/01/08
12,060 11/28/07
02/15/08
10,755
100
3.75
05/27/08
06/05/08
1,500 09/22/08
10/24/08
1,500
100
98,000 08/02/02
08/23/02
49,240
100
22,940 07/07/03
07/28/03
15,210
100
33,000 08/02/02
08/23/02
16,685
100
4,400 08/25/08
08/26/08
4,400
100
245.0
447.90
07/15/03
07/25/08
171,900
97,790
5,753,878
3,798,371
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 137
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1401 / 7587
6525 S KARLOV AVE
1.0
02/24/95
02/24/95
0 02/24/95
02/24/95
300
100
805 06 1283 / 7469
6699 S KEATING AVE
1.0
05/10/95
05/10/95
0 05/10/95
05/10/95
300
100
805 06 1264 / 7450
7842 S KEATING AVE
1.0
02/20/95
02/20/95
0 02/20/95
02/20/95
300
100
805 06 1141 / 7327
5543 S KEELER AVE
1.0
10/02/96
10/02/96
0 10/02/96
10/02/96
300
100
805 06 1143 / 7329
6424 S KEELER AVE
1.0
02/14/96
02/14/96
0 02/14/96
02/14/96
300
100
805 06 1144 / 7330
6557 S KEELER AVE
1.0
02/24/95
02/24/95
0 02/24/95
02/24/95
300
100
805 06 1145 / 7331
6619 S KEELER AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 1157 / 7343
6141 S KENNETH AVE
1.0
08/02/95
08/02/95
0 08/02/95
08/02/95
300
100
805 06 1175 / 7361
6402 S KENNETH AVE
1.0
02/22/95
02/22/95
0 02/22/95
02/22/95
300
100
805 06 1195 / 7381
7721 S KENTON AVE
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 1177 / 7363
7747 S KENTON AVE
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 1178 / 7364
7822 S KENTON AVE
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 1179 / 7365
7831 S KENTON AVE
1.0
03/12/95
03/12/95
0 03/12/95
03/12/95
300
100
805 06 1181 / 7367
7843 S KENTON AVE
1.0
03/28/95
03/28/95
0 03/28/95
03/28/95
300
100
805 06 2027 / 8213
6300 S KILBOURN AVE
1.0
02/07/96
02/07/96
0 02/07/96
02/07/96
300
100
805 06 1528 / 7714
6837 S KILDARE AVE
1.0
11/07/97
11/07/97
0 11/07/97
11/07/97
300
100
805 06 2012 / 8198
7705 S KILPATRICK AVE
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 2013 / 8199
7820 S KILPATRICK AVE
1.0
10/04/96
10/04/96
0 10/04/96
10/04/96
300
100
805 06 1997 / 8183
6657 S KOLIN AVE
1.0
03/20/97
03/20/97
0 03/20/97
03/20/97
300
100
805 06 2020 / 8206
6035 S KOLMAR AVE
1.0
06/17/96
06/17/96
0 06/17/96
06/17/96
300
100
805 06 2023 / 8209
7759 S KOLMAR AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0310 / 6496
6315 S LAMON AVE
1.0
07/25/96
07/25/96
0 07/25/96
07/25/96
300
100
805 06 0317 / 6503
6345 S LATROBE AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0301 / 6487
6365 S LATROBE AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0349 / 6535
6338 S LECLAIRE AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0360 / 6546
6360 S LECLAIRE AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 1977 / 8163
6223 S MONITOR AVE
1.0
06/17/96
06/17/96
0 06/17/96
06/17/96
300
100
300 06 0139 / 5289
6500 S PULASKI RD
1,907.0
03/01/06
09/01/06
43,964 06/01/06
06/21/06
57,618
100
302 00 0092 / 5774
6500 S PULASKI RD
29.0
0 01/09/01
01/25/02
6,834
100
302 00 0092 / 5774
6719 S PULASKI RD
1.0
0 10/09/01
10/09/01
236
100
302 00 0092 / 5774
6735 S PULASKI RD
1.0
0 10/09/01
10/09/01
236
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 138
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0092 / 5774
6857 S PULASKI RD
1.0
0 10/15/01
10/15/01
236
100
805 06 1032 / 7218
4551 W 55TH ST
1.0
12/15/95
12/15/95
0 12/15/95
12/15/95
300
100
805 06 1033 / 7219
4551 W 55TH ST
1.0
10/05/95
10/05/95
0 10/05/95
10/05/95
300
100
805 06 1009 / 7195
3721 W 61ST PL
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1038 / 7224
3721 W 61ST ST
1.0
03/23/95
03/23/95
0 03/23/95
03/23/95
300
100
805 06 1058 / 7244
5133 W 63RD PL
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 1039 / 7225
5157 W 63RD PL
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 1040 / 7226
5201 W 63RD PL
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 1201 / 7387
3800 W 63RD ST
1.0
12/16/97
12/16/97
0 12/16/97
12/16/97
300
100
805 06 1761 / 7947
4610 W 63RD ST
1.0
05/09/97
05/09/97
0 05/09/97
05/09/97
300
100
805 06 1046 / 7232
5632 W 63RD ST
1.0
05/05/95
05/05/95
0 05/05/95
05/05/95
300
100
805 06 1003 / 7189
5124 W 64TH ST
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0984 / 7170
5160 W 64TH ST
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0985 / 7171
5200 W 64TH ST
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0986 / 7172
5220 W 64TH ST
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0990 / 7176
4548 W 66TH PL
1.0
04/28/95
04/28/95
0 04/28/95
04/28/95
300
100
805 06 0962 / 7148
3616 W 66TH ST
1.0
03/06/97
03/06/97
0 03/06/97
03/06/97
300
100
805 06 1545 / 7731
3801 W 68TH PL
1.0
10/29/97
10/29/97
0 10/29/97
10/29/97
300
100
805 06 1643 / 7829
4458 W 77TH PL
1.0
08/28/97
08/28/97
0 08/28/97
08/28/97
300
100
805 06 0996 / 7182
4548 W 77TH PL
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 1498 / 7684
4349 W 78TH ST
1.0
11/14/97
11/14/97
0 11/14/97
11/14/97
300
100
805 06 1499 / 7685
4357 W 78TH ST
1.0
11/14/97
11/14/97
0 11/14/97
11/14/97
300
100
805 06 0778 / 6964
4526 W 83RD ST
1.0
07/19/96
07/19/96
0 07/19/96
07/19/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
6500 S PULASKI RD
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
6500 S PULASKI RD
1,988.0
43,964
79,860
Lamps 1,661.0
06/01/07
12/31/07
48,899 12/18/07
12/29/07
47,421
100
0 07/18/02
07/21/02
28,514
100
Installations 1,566.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 139
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 06 0167 / 5306
W 56TH PL AND S KARLOV AVE
4.0
0 12/08/99
12/08/99
1,404
100
300 06 0167 / 5306
W 63RD ST AND S LAWNDALE AVE
7.0
0 12/03/99
12/03/99
1,291
100
300 06 0167 / 5306
W 83RD ST AND S KOSTNER AVE
6.0
0 07/22/99
07/22/99
1,523
100
300 06 0167 / 5306
W 83RD ST AND S SCOTTSDALE AVE
3.0
0 12/02/99
12/02/99
470
100
300 06 0167 / 5306
6900-7000 S HAMLIN AVE
3.0
0 05/22/99
05/22/99
1,053
100
300 06 0167 / 5306
6425 S KILBOURN AVE
3.0
0 04/14/99
04/14/99
1,053
100
302 00 0092 / 5774
4130 W 61ST ST
1.0
0 07/23/01
07/23/01
471
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
6255 S AUSTIN AVE
Work Type: Ornamental - Piggyback Lighting
27.0
0
7,265
Installations .0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
Fixtures
300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
28.81
12/01/07
01/01/08
38,894 11/28/07
02/15/08
34,572
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
3.75
07/28/08
08/08/08
5,063 09/22/08
10/24/08
3,930
100
300 09 / 33079
ON W 59TH ST FROM S PULASKI RD TO S KOLMAR AVE
45.0
07/28/08
08/15/08
61,350 09/22/08
10/24/08
47,157
100
300 05 0013 / 5128
ON W 63RD ST FROM S PARKSIDE AVE TO S AUSTIN AVE
20.0
12/20/06
12/21/06
2,800 12/20/06
12/21/06
0
100
300 09 / 33079
ON W MARQUETTE RD FROM S PULASKI RD TO S KOLMAR AVE
45.0
07/28/08
08/15/08
61,350 09/22/08
10/24/08
47,156
100
300 06 / 33438
6200-6300 S CENTRAL AVE
7.0
07/21/08
08/08/08
9,450 09/02/08
09/05/08
7,447
100
300 06 / 33439
6300-6500 S CICERO AVE
15.0
07/07/08
07/25/08
20,000 08/11/08
08/22/08
15,957
100
300 06 / 33440
5500-7000 S PULASKI RD
236.0
07/14/08
08/29/08
380,000 08/04/08
09/19/08
244,699
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
6500 S PULASKI RD
400.56
578,906
400,918
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 140
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0014 / 5437
ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL
0
0
300 09 / 33079
ON S KARLOV AVE FROM W 63RD ST TO W MARQUETTE RD
4.0
260,000 04/01/08
12/01/08
0
0
300 09 / 33079
ON S KEDVALE AVE FROM W 63RD ST TO W 65TH ST
2.0
130,000 04/01/08
12/01/08
0
0
300 11 / 32202
ON S KEDVALE AVE FROM W 65TH ST TO W MARQUETTE RD
2.0
08/30/07
10/26/07
110,000 08/30/07
10/26/07
0
100
300 06 / 32146
ON S KEELER AVE FROM W 59TH ST TO W 63RD ST
4.0
12/05/07
06/23/08
319,274
0
75
300 06 0308 / 5414
ON S KILDARE AVE FROM W 63RD ST TO W 65TH ST
2.0
04/10/06
06/09/06
169,820 04/07/06
06/01/06
99,038
100
300 07 0013 / 5436
ON S KILDARE AVE FROM W 65TH ST TO W MARQUETTE RD
2.0
04/06/06
06/01/06
100,000 04/06/06
06/01/06
80,000
100
300 09 / 33079
ON S KOLIN AVE FROM W 63RD ST TO W MARQUETTE RD
4.0
260,000 04/01/08
12/01/08
0
0
300 09 / 33079
ON S KOMENSKY AVE FROM W 63RD ST TO W MARQUETTE RD
4.0
237,593
300 05 0013 / 5128
ON S KOSTNER AVE FROM W 55TH ST TO W 57TH ST
2.0
04/04/05
11/18/05
300 06 0298 / 5405
ON S KOSTNER AVE FROM W 57TH ST TO W 59TH ST
2.0
07/25/05
300 06 / 32275
6300-6500 S KEELER AVE
2.0
04/01/07
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
.0
03/01/06
12/31/06
0
0
0
175,000 07/25/05
09/15/05
73,233
100
11/01/05
0 08/01/05
09/19/05
127,848
100
12/31/07
153,971 03/22/07
06/01/07
94,709
100
30.0
1,915,658
474,828
Blocks
300 03 0013 / 4884
ON S KOSTNER AVE FROM W 59TH ST TO W 65TH ST
6.0
06/01/04
11/30/04
465,000 06/16/04
12/14/04
442,237
100
300 06 0267 / 5375
ON S KOSTNER AVE FROM W 63RD ST TO W 65TH ST
2.0
06/01/04
09/01/04
150,000 06/16/04
12/14/04
76,780
100
300 06 / 32050
ON W 57TH ST FROM S HAMLIN AVE TO S KEELER AVE
4.0
06/15/06
04/01/06
200,000 06/15/06
09/15/06
199,615
100
300 06 / 32050
ON W 62ND PL FROM S LAWNDALE AVE TO S PULASKI RD
3.0
06/15/06
01/17/07
180,000 10/23/06
02/16/07
197,854
100
300 06 0122 / 5275
ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE
1.0
05/01/03
07/01/03
106,250 04/22/03
06/30/03
106,250
100
300 06 0235 / 5349
ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE
2.0
05/01/03
08/01/03
75,243 03/14/03
06/06/03
69,065
100
300 06 0235 / 5349
ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE
2.0
05/01/03
07/01/03
77,102 04/22/03
06/30/03
69,065
100
300 06 / 32050
6500-6700 S KEELER AVE
2.0
06/15/06
04/01/06
110,000 06/15/06
09/07/06
102,960
100
300 06 / 32050
4000 W 70TH ST
2.0
06/15/06
06/15/06
125,000 06/15/06
09/07/06
121,805
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 06 / 32969
ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09
24.0
1,488,595
1,385,631
Locations 1.0
12/03/07
02/29/08
60,000 01/11/08
03/28/08
34,407
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 141
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
30.15
08/07/07
08/18/07
6,633 08/07/07
08/18/07
6,633
100
300 07 0013 / 5436
ON S KARLOV AVE FROM W 79TH ST TO W 80TH PL
4.0
08/01/06
08/10/06
800 08/22/06
08/22/06
721
100
300 07 0013 / 5436
ON S KEDVALE AVE FROM W 79TH PL TO W 80TH PL
3.0
08/01/06
08/10/06
600 08/22/06
08/22/06
541
100
300 07 0013 / 5436
ON S KEELER AVE FROM W 79TH PL TO W 80TH PL
4.0
08/01/06
08/10/06
800 08/22/06
08/22/06
721
100
300 07 0013 / 5436
ON S KOMENSKY AVE FROM W 79TH ST TO W 80TH PL
2.0
08/01/06
08/10/06
400 08/22/06
08/22/06
360
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
3.75
06/02/08
06/13/08
1,125 06/02/08
06/13/08
788
100
300 06 0058 / 5229
ON S PULASKI RD FROM W 55TH ST TO W 83RD ST
190.0
52,780 08/12/02
09/25/02
52,780
100
302 00 0076 / 5764
ON S PULASKI RD FROM W 59TH ST TO W 74TH ST
230.0
06/01/98
06/18/98
0 06/01/98
06/18/98
3,910
100
300 07 0013 / 5436
ON S TRIPP AVE FROM W 79TH ST TO W 81ST ST
3.0
08/01/06
08/10/06
600 08/22/06
08/22/06
540
100
300 04 0216 / 5114
ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE
9.0
05/01/06
11/01/06
1,911 05/17/06
06/29/06
1,911
100
300 06 0108 / 5263
ON W 59TH ST FROM S HAMLIN AVE TO S KENTON AVE
61.0
06/20/03
06/29/03
15,550 05/30/03
06/06/03
15,330
100
300 06 0058 / 5229
ON W 63RD ST FROM S KARLOV AVE TO S LAWNDALE AVE
121.0
08/12/02
09/25/02
30,660 08/12/02
09/25/02
30,660
100
302 00 0076 / 5764
ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE
187.44
09/01/00
12/31/00
300 06 0108 / 5263
ON W 71ST ST FROM S CENTRAL PARK AVE TO S PULASKI RD
22.0
07/01/03
07/14/03
6,600 06/15/03
06/30/03
6,580
100
300 06 0108 / 5263
W 63RD ST AND S CICERO AVE
10.0
06/25/03
07/04/03
3,800 07/25/03
08/05/03
3,290
100
300 06 / 33438
6200-6300 S CENTRAL AVE
20.0
06/30/08
07/25/08
7,100 08/27/08
08/29/08
4,200
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0296 / 5403
W 63RD PL AND S PULASKI RD
Work Type: Strt Lighting
900.34
0
3,186
129,359
132,150
Blocks 1.0
03/01/05
08/15/07
45,200 01/17/07
10/15/07
22,051
100
Blocks
300 06 0246 / 5356
ON S LATROBE AVE FROM W 63RD ST TO W 65TH ST
2.0
04/01/04
07/01/04
108,345 04/06/04
08/24/04
80,494
100
300 06 0246 / 5356
ON S LAWLER AVE FROM W 63RD ST TO W 64TH ST
1.0
04/01/04
07/01/04
108,345 04/06/04
08/24/04
80,494
100
300 06 0246 / 5356
ON S LECLAIRE AVE FROM W 63RD PL TO W 65TH ST
1.50
04/01/04
07/01/04
108,345 04/06/04
08/24/04
80,494
100
300 06 0247 / 5357
ON W 58TH ST FROM S KEELER AVE TO S KILDARE AVE
2.0
10/15/03
12/15/03
132,000 10/08/03
11/14/03
131,842
100
300 06 0246 / 5356
ON W 63RD PL FROM S LATROBE AVE TO S LAWLER AVE
2.0
04/01/04
07/01/04
108,345 04/06/04
08/24/04
80,494
100
8.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
6500 S PULASKI RD
565,380
453,818
Lamps 1,015.0
03/01/04
12/01/04
5,278 07/31/06
08/28/06
11,053
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 142
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0099 / 5260
6500 S PULASKI RD
106.0
10/07/03
10/08/03
5,959 09/24/03
09/25/03
6,426
100
805 06 2449 / 8635
3601 W 59TH ST
12.0
04/13/93
04/13/93
0 04/13/93
04/13/93
9,000
100
805 06 2450 / 8636
3601 W 60TH ST
8.0
04/14/93
04/14/93
0 04/14/93
04/14/93
6,000
100
805 06 2821 / 9007
3630 W 61ST ST
8.0
03/28/94
03/28/94
0 03/28/94
03/28/94
6,000
100
805 06 2820 / 9006
3600 W 62ND ST
8.0
01/13/93
01/13/93
0 01/13/93
01/13/93
6,000
100
805 06 2815 / 9001
3600 W 63RD ST
10.0
05/02/93
05/02/93
0 05/02/93
05/02/93
7,500
100
805 06 2817 / 9003
3600 W 64TH ST
8.0
05/14/93
05/14/93
0 05/14/93
05/14/93
6,000
100
805 06 2819 / 9005
3600 W 65TH ST
8.0
05/17/93
05/17/93
0 05/17/93
05/17/93
6,000
100
805 06 2816 / 9002
3600 W 66TH ST
8.0
05/19/93
05/19/93
0 05/19/93
05/19/93
6,000
100
805 06 2814 / 9000
3605 W MARQUETTE RD
10.0
05/25/93
05/25/93
0 05/25/93
05/25/93
7,500
100
Totals per Underpass Lighting
186.0
5,959
66,426
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 143
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S AUSTIN AVE AND W 63RD ST
.50
0 08/29/02
08/29/02
4,675
100
210 06 0130 / 4389
S CICERO AVE AND W 59TH ST
.50
0 11/05/02
11/05/02
925
100
210 06 0130 / 4389
S MELVINA AVE AND W 63RD ST
.50
0 08/28/02
08/28/02
4,675
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0127 / 4386
S KILDARE AVE AND W MARQUETTE RD
Work Type: New Signal
1.50
0
10,274
0
0
Locations .0
06/01/05
12/01/05
0
Locations
210 06 0127 / 4386
S KILDARE AVE AND W MARQUETTE RD
.0
06/01/05
12/01/05
0
0
0
210 06 0127 / 4386
W 55TH ST AND S KILBOURN AVE
.50
12/01/06
03/31/07
105,000
161,541
100
300 06 0283 / 5391
W 63RD ST AND S KEELER AVE
1.0
09/02/04
09/30/04
69
100
1.50
Totals per New Signal
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
W 63RD ST AND S LATROBE AVE
Work Type: Signals 300 06 0096 / 5258
6500 S PULASKI RD
Work Type: TSM Install
69 09/09/04
09/09/04
105,069
161,610
Crossings .50
2,000 06/08/01
08/01/01
134
100
Intersections 30.0
09/01/03
09/07/03
0 08/23/03
09/02/03
4,744
100
Locations
210 06 0187 / 4432
W 63RD ST AND S LATROBE AVE
.50
06/01/04
08/15/06
100,000 06/14/04
09/27/06
89,629
100
814 06 0262 / 16474
6000 S CENTRAL AVE
1.0
08/21/90
08/21/90
0 08/21/90
08/21/90
72,704
100
814 06 0192 / 16404
6300 S CENTRAL AVE
1.0
10/17/95
10/17/95
0 10/17/95
10/17/95
125,000
100
814 06 0370 / 16560
6300 S KEELER AVE
1.0
11/08/95
11/08/95
0 11/08/95
11/08/95
86,471
100
210 06 0090 / 4353
6300 S KILBOURN AVE
1.0
11/01/99
03/01/00
150,000 10/01/99
11/30/99
108,398
100
814 06 0146 / 16360
6700 S LAWNDALE AVE
1.0
08/27/91
08/27/91
0 08/27/91
08/27/91
94,990
100
814 06 0274 / 16486
7500 S PULASKI RD
1.0
04/27/89
04/27/89
0 04/27/89
04/27/89
97,888
100
Totals per TSM Install Totals per Traffic
6.50
250,000
675,080
357,722
852,466
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 144
1/1/2008 AND 12/31/2008
Ward 13 Frank J. Olivo CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting 300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
Locations 1.34
08/07/07
08/18/07
603 08/07/07
08/18/07
603
100
.25
06/02/08
06/13/08
50 06/02/08
06/13/08
21
100
1.59
653
624
Totals per Construction Phase
6,111,600
4,650,836
Totals for Ward 13
6,134,300
4,676,109
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 145
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0299 / 5406
BUREAU OF ELECTRICITY
300 06 0308 / 5414
ON S HARDING AVE FROM W 47TH ST TO W 49TH ST
300 06 / 32277
ON S KEELER AVE FROM W 43RD ST TO W 47TH ST
300 06 0292 / 5399
4720 S ST LOUIS AVE
Totals per Design/Engineering
Work Type: Feasibility Study
Projects 1.0
10/01/01
10/03/03
300,000 01/01/02
12/31/04
76,558
100
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
7,303
100
4.0
04/01/08
08/30/08
260,000 04/22/08
05/09/08
0
100
.0
01/20/05
12/21/05
0 01/20/05
03/01/05
0
100
5.0
560,000
83,861
Projects
302 00 0079 / 5767
ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
302 00 0079 / 5767
ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
Totals per Feasibility Study Totals per Lighting/Electrical
.0
0
0
560,000
83,861
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 146
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0122 / 5275
ON S ALBANY AVE FROM W 36TH ST TO W PERSHING RD
300 06 0069 / 5233
ON S ALBANY AVE FROM W 43RD ST TO W 47TH ST
300 06 0122 / 5275
ON S FRANCISCO AVE FROM W 36TH ST TO W PERSHING RD
300 06 0069 / 5233
Fixtures .80
08/01/04
08/15/04
316 06/14/04
06/22/04
218
100
59.0
10/04/02
10/22/02
23,600 10/01/02
10/18/02
12,463
100
3.0
08/01/04
08/15/04
1,125 06/15/04
06/21/04
919
100
ON S FRANCISCO AVE FROM W 43RD ST TO W 47TH ST
60.0
10/04/02
10/22/02
24,000 10/01/02
10/18/02
12,463
100
300 06 0069 / 5233
ON S MOZART ST FROM W 43RD ST TO W 47TH ST
30.0
10/04/02
10/22/02
12,000 10/01/02
10/18/02
6,232
100
300 06 0122 / 5275
ON S MOZART ST FROM W 45TH ST TO W 47TH ST
4.50
03/15/03
03/15/03
914 03/12/03
03/12/03
945
100
300 06 0069 / 5233
ON S RICHMOND ST FROM W 43RD ST TO W 47TH ST
60.0
10/04/02
10/22/02
24,000 10/01/02
10/18/02
12,463
100
300 06 0069 / 5233
ON S SACRAMENTO AVE FROM W 43RD ST TO W 47TH ST
60.0
10/04/02
10/22/02
24,000 10/01/02
10/18/02
12,462
100
300 06 0069 / 5233
ON S WHIPPLE ST FROM W 43RD ST TO W 47TH ST
60.0
10/04/02
10/22/02
24,000 10/01/02
10/18/02
12,672
100
300 06 0069 / 5233
S ARCHER AVE AND S DRAKE AVE
19.0
05/10/02
05/10/02
3,990 05/07/02
05/07/02
3,857
100
302 00 0092 / 5774
4100-4199 S FRANCISCO AVE
5.0
11/01/01
11/01/01
1,029 09/29/01
09/29/01
1,029
100
302 00 0092 / 5774
4115 S FRANCISCO AVE
1.0
10/06/01
10/06/01
206 09/29/01
09/29/01
206
100
302 00 0092 / 5774
4201 S FRANCISCO AVE
1.0
0 11/24/01
11/24/01
206
100
302 00 0092 / 5774
4915-5000 S ROCKWELL ST
2.0
617 11/21/01
11/21/01
617
100
302 00 0092 / 5774
5100 S ROCKWELL ST
5.0
0 08/28/01
08/28/01
1,029
100
300 06 0069 / 5233
4100 S SACRAMENTO AVE
2.0
420 02/01/02
02/01/02
406
100
302 00 0092 / 5774
4500-4599 S SAWYER AVE
11.0
0 12/07/01
12/07/01
2,261
100
302 00 0092 / 5774
5631-5647 S SPAULDING AVE
2.0
10/07/01
10/07/01
412 09/29/01
09/29/01
412
100
300 06 0069 / 5233
3001 W 40TH PL
1.0
02/04/02
02/04/02
210 02/01/02
02/01/02
203
100
300 06 0069 / 5233
3001 W 40TH ST
1.0
02/04/02
02/04/02
210 02/01/02
02/01/02
203
100
300 06 0122 / 5275
2958 W 43RD ST
1.0
05/09/03
05/09/03
210 05/06/03
05/06/03
203
100
300 06 0069 / 5233
3055 W 43RD ST
1.0
01/11/02
01/11/02
210 01/18/02
01/18/02
203
100
302 00 0092 / 5774
3055 W 43RD ST
1.0
0 01/18/02
01/18/02
203
100
300 06 0122 / 5275
2650 W 51ST ST
1,078.0
420,850 07/28/03
08/20/03
258,291
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
1,468.30
10/01/01
02/04/02
09/10/03
10/01/01
02/04/02
10/10/03
562,319
340,165
3,103,642
1,875,984
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 147
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 05 0014 / 5129
ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD
300 05 0014 / 5129
ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE
300 06 0122 / 5275
ON S PULASKI RD FROM W 40TH ST TO W 51ST ST
300 06 0069 / 5233
ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE
6.50
302 00 0092 / 5774
ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE
6.50
02/24/02
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
47.52
300 05 0014 / 5129
ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
302 00 0092 / 5774
3300 W 55TH ST
Totals per 400 Watt Changeout
39.0
04/04/05
11/18/05
15,600 06/01/05
06/20/05
21,333
100
3.0
04/04/05
11/18/05
1,200 06/01/05
06/20/05
2,120
100
165.0
05/01/03
06/01/03
66,600 06/20/03
06/25/03
40,202
100
2,600 02/21/02
02/21/02
2,600
100
02/24/02
2,600 02/21/02
02/21/02
2,438
100
05/10/04
06/10/04
19,008 05/01/04
05/11/04
18,321
100
96.0
04/04/05
11/18/05
38,400 06/01/05
06/20/05
58,848
100
112.69
05/01/04
05/15/04
45,076 05/10/04
05/16/04
16,013
100
5.0
03/03/02
03/03/02
2,000 02/28/02
02/28/02
1,875
100
481.21
193,084
163,750
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 148
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0767 / 6953
3833 S ALBANY AVE
1.0
05/24/96
05/24/96
0 05/24/96
05/24/96
300
100
805 06 0710 / 6896
4393 S ARCHER AVE
1.0
06/19/96
06/19/96
0 06/19/96
06/19/96
300
100
805 06 0711 / 6897
4432 S ARCHER AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0712 / 6898
4452 S ARCHER AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0713 / 6899
4589 S ARCHER AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0744 / 6930
5315 S ARTESIAN AVE
1.0
01/11/95
01/11/95
0 01/11/95
01/11/95
300
100
805 06 0764 / 6950
5400 S ARTESIAN AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 1911 / 8097
4401 S CHRISTIANA AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 2029 / 8215
5530 S CHRISTIANA AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0496 / 6682
5558 S CHRISTIANA AVE
1.0
01/12/95
01/12/95
0 01/12/95
01/12/95
300
100
805 06 0507 / 6693
5609 S CHRISTIANA AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 0488 / 6674
5630 S CHRISTIANA AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0469 / 6655
5640 S CHRISTIANA AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0480 / 6666
5658 S CHRISTIANA AVE
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 0343 / 6529
5734 S CHRISTIANA AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 0442 / 6628
5758 S CHRISTIANA AVE
1.0
01/23/95
01/23/95
0 01/23/95
01/23/95
300
100
805 06 0643 / 6829
4643 S DRAKE AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 1770 / 7956
5022 S FAIRFIELD AVE
1.0
05/15/97
05/15/97
0 05/15/97
05/15/97
300
100
805 06 0842 / 7028
4323 S FRANCISCO AVE
1.0
01/27/95
01/27/95
0 01/27/95
01/27/95
300
100
805 06 0971 / 7157
4458 S FRANCISCO AVE
1.0
01/26/95
01/26/95
0 01/26/95
01/26/95
300
100
805 06 1082 / 7268
4600 S HOMAN AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 1103 / 7289
5500 S HOMAN AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 1084 / 7270
5501 S HOMAN AVE
1.0
04/13/95
04/13/95
0 04/13/95
04/13/95
300
100
805 06 1085 / 7271
5506 S HOMAN AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 1086 / 7272
5516 S HOMAN AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 1087 / 7273
5540 S HOMAN AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 1089 / 7275
5558 S HOMAN AVE
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1090 / 7276
5620 S HOMAN AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 1091 / 7277
5630 S HOMAN AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 1092 / 7278
5656 S HOMAN AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 1093 / 7279
5740 S HOMAN AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 149
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1081 / 7267
5758 S HOMAN AVE
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1420 / 7606
4359 S KARLOV AVE
1.0
08/06/96
08/06/96
0 08/06/96
08/06/96
300
100
805 06 1165 / 7351
4000 S KEDZIE AVE
1.0
03/14/96
03/14/96
0 03/14/96
03/14/96
300
100
805 06 1558 / 7744
4515 S KOMENSKY AVE
1.0
10/17/97
10/17/97
0 10/17/97
10/17/97
300
100
805 06 1559 / 7745
4539 S KOMENSKY AVE
1.0
10/17/97
10/17/97
0 10/17/97
10/17/97
300
100
805 06 1560 / 7746
4559 S KOMENSKY AVE
1.0
10/17/97
10/17/97
0 10/17/97
10/17/97
300
100
805 06 0328 / 6514
5002 S LAWNDALE AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 1885 / 8071
5375 S MAPLEWOOD AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 0688 / 6874
4417 S RICHMOND ST
1.0
10/18/95
10/18/95
0 10/18/95
10/18/95
300
100
805 06 0691 / 6877
5019 S ROCKWELL ST
1.0
08/30/95
08/30/95
0 08/30/95
08/30/95
300
100
805 06 0701 / 6887
3834 S SACRAMENTO AVE
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0704 / 6890
4433 S SACRAMENTO AVE
1.0
01/27/95
01/27/95
0 01/27/95
01/27/95
300
100
805 06 0657 / 6843
4343 S SPAULDING AVE
1.0
06/05/95
06/05/95
0 06/05/95
06/05/95
300
100
805 06 0658 / 6844
4424 S SPAULDING AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0631 / 6817
5856 S SPAULDING AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 0435 / 6621
4748 S SPRINGFIELD AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0417 / 6603
4425 S ST LOUIS AVE
1.0
08/28/95
08/28/95
0 08/28/95
08/28/95
300
100
805 06 0418 / 6604
4501 S ST LOUIS AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0419 / 6605
4621 S ST LOUIS AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0393 / 6579
5501 S ST LOUIS AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0348 / 6534
5620 S TROY ST
1.0
01/10/95
01/10/95
0 01/10/95
01/10/95
300
100
805 06 1672 / 7858
4342 S TRUMBULL AVE
1.0
07/22/97
07/22/97
0 07/22/97
07/22/97
300
100
805 06 0387 / 6573
5516 S TRUMBULL AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 0368 / 6554
5530 S TRUMBULL AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0369 / 6555
5618 S TRUMBULL AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 0371 / 6557
5630 S TRUMBULL AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0372 / 6558
5640 S TRUMBULL AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 0373 / 6559
5656 S TRUMBULL AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 0521 / 6707
5150 S WESTERN AVE
1.0
05/22/95
05/22/95
0 05/22/95
05/22/95
300
100
805 06 0451 / 6637
4349 S WHIPPLE ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0452 / 6638
5714 S WHIPPLE ST
1.0
04/13/95
04/13/95
0 04/13/95
04/13/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 150
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0896 / 7082
2923 W 38TH PL
1.0
06/05/95
06/05/95
0 06/05/95
06/05/95
300
100
805 06 0897 / 7083
2935 W 38TH PL
1.0
06/05/95
06/05/95
0 06/05/95
06/05/95
300
100
302 00 0092 / 5774
3108 W 39TH PL
1.0
0 12/24/01
12/24/01
236
100
805 06 0920 / 7106
2822 W 40TH ST
1.0
04/16/96
04/16/96
0 04/16/96
04/16/96
300
100
805 06 0923 / 7109
3100 W 44TH ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0924 / 7110
3118 W 44TH ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0910 / 7096
4200 W 46TH ST
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0919 / 7105
3528 W 47TH ST
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 0930 / 7116
4010 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0901 / 7087
4024 W 47TH ST
1.0
05/28/96
05/28/96
0 05/28/96
05/28/96
300
100
805 06 0902 / 7088
4034 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0903 / 7089
4058 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0904 / 7090
4100 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0905 / 7091
4124 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0907 / 7093
4134 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0908 / 7094
4158 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 0909 / 7095
4200 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 1050 / 7236
3712 W 50TH ST
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
302 00 0092 / 5774
2559 W 51ST ST
1.0
0 09/27/01
09/27/01
236
100
300 06 0139 / 5289
2650 W 51ST ST
1,371.0
33,005 04/01/06
04/21/06
41,423
100
302 00 0092 / 5774
2650 W 51ST ST
29.0
0 03/07/01
11/27/01
6,834
100
805 06 0955 / 7141
2654 W 51ST ST
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1497 / 7683
3222 W 55TH ST
1.0
11/14/97
11/14/97
0 11/14/97
11/14/97
300
100
805 06 1030 / 7216
3337 W 55TH ST
1.0
01/26/95
01/26/95
0 01/26/95
01/26/95
300
100
805 06 1031 / 7217
3417 W 55TH ST
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1034 / 7220
3434 W 56TH ST
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1006 / 7192
3744 W 57TH ST
1.0
04/27/95
04/27/95
0 04/27/95
04/27/95
300
100
805 06 1381 / 7567
3741 W 58TH PL
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 0555 / 6741
2956 W PERSHING RD
1.0
01/24/96
01/24/96
0 01/24/96
01/24/96
300
100
805 06 0526 / 6712
3016 W PERSHING RD
1.0
06/17/96
06/17/96
0 06/17/96
06/17/96
300
100
805 06 0527 / 6713
3038 W PERSHING RD
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
03/01/06
09/01/06
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 151
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping
Installations 1,491.0
33,005
75,429
Lamps
300 06 0215 / 5336
5236 S WESTERN AVE
1,299.0
06/01/07
12/31/07
38,242 09/01/07
09/01/07
37,086
100
300 06 0215 / 5336
2650 W 51ST ST
1,627.0
06/01/07
12/31/07
47,898 09/01/07
10/01/07
46,450
100
Totals per Arterial Group Relamping
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2650 W 51ST ST
Work Type: Flood Light Install
2,926.0
86,140
83,536
Installations 1,532.0
0 07/09/02
07/12/02
27,895
100
Fixtures
300 06 0167 / 5306
S ARCHER AVE AND S PULASKI RD
5.0
0 11/23/99
11/23/99
1,755
100
300 06 0167 / 5306
W 55TH ST AND S CALIFORNIA AVE
2.50
0 12/08/99
12/08/99
376
100
300 06 0167 / 5306
W 55TH ST AND S KEDZIE AVE
4.0
0 05/20/99
05/20/99
1,404
100
302 00 0092 / 5774
4101 S CICERO AVE
2.0
0 05/02/01
05/02/01
941
100
302 00 0092 / 5774
4107 S CICERO AVE
2.0
0 05/02/01
05/02/01
941
100
302 00 0092 / 5774
4111 S CICERO AVE
2.0
0 05/02/01
05/02/01
941
100
302 00 0092 / 5774
4115 S CICERO AVE
2.0
0 05/02/01
05/02/01
941
100
302 00 0092 / 5774
4121 S CICERO AVE
2.0
0 05/02/01
05/02/01
941
100
300 06 0167 / 5306
3800 S FRANCISCO AVE
1.0
0 12/08/99
12/08/99
351
100
300 09 / 33080
5317 S MOZART ST
1.0
500
0
0
300 09 / 33080
5401 S MOZART ST
1.0
500
0
0
300 09 / 33080
5440 S MOZART ST
1.0
350
0
0
300 06 0072 / 5235
5656 S ST LOUIS AVE
300 09 / 33080
2836 W 55TH ST
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
4720 S ST LOUIS AVE Project has been completed. (100%) Note Last Updated on 01-SEP-06
08/03/01
09/28/01
0 07/02/01
07/02/01
2,553
1.0
350
0
26.50
1,700
11,144
0
Installations 1.0
03/11/05
01/23/06
6,000 03/11/05
01/23/06
1,229
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 152
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 302 00 0092 / 5774
ON S KEDZIE AVE FROM W 51ST ST TO W 55TH ST
Work Type: Ornamental - Piggyback Lighting
Projects 50.0
66,000 10/08/01
11/15/01
35,349
100
Fixtures
300 05 0014 / 5129
ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD
20.0
04/04/05
11/18/05
27,000 05/01/05
06/20/05
10,940
100
300 05 0014 / 5129
ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE
13.0
04/04/05
11/18/05
17,550 06/01/05
06/20/05
24,240
100
300 06 0122 / 5275
ON S KEDZIE AVE FROM W 55TH ST TO W 57TH ST
14.0
16,800 08/27/03
08/27/03
19,097
100
300 05 0014 / 5129
ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE
300 05 0014 / 5129
ON W 51ST ST FROM S WESTERN AVE TO S CALIFORNIA AVE
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
2650 W 51ST ST
3.0
04/04/05
11/18/05
4,050 06/01/05
06/20/05
2,121
100
17.0
04/04/05
11/18/05
22,950 06/01/05
06/20/05
10,527
100
11.80
05/01/04
05/15/04
15,930 05/10/04
05/21/04
17,029
100
78.80
104,280
83,954
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 153
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0014 / 5437
ON S ALBANY AVE FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
300 11 / 32203
ON S AVERS AVE FROM W 45TH ST TO W 47TH ST
2.0
09/27/07
12/31/07
155,000
0
0
300 07 0014 / 5437
ON S AVERS AVE FROM W 47TH ST TO S ARCHER AVE
2.0
05/31/06
07/31/06
140,000 05/31/06
93,542
100
300 07 0014 / 5437
ON S CALIFORNIA AVE FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S CHRISTIANA AVE FROM W 56TH ST TO W 57TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S FRANCISCO AVE FROM S ARCHER AVE TO W 42ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S FRANCISCO AVE FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S FRANCISCO AVE FROM W 51ST ST TO W 52ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S FRANCISCO AVE FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 06 0298 / 5405
ON S HAMLIN AVE FROM W 47TH ST TO W 49TH ST
2.0
06/15/05
07/15/05
0 05/23/05
07/22/05
97,512
100
300 07 0014 / 5437
ON S HAMLIN AVE FROM W 58TH ST TO W 58TH PL
0
0
300 06 0308 / 5414
ON S HARDING AVE FROM W 47TH ST TO W 49TH ST
04/21/06
108,603
100
300 07 0014 / 5437 300 07 0014 / 5437
07/21/06
0
0
.0
03/01/06
12/31/06
2.0
03/15/06
05/15/06
ON S HOMAN AVE FROM W 55TH ST TO W 56TH ST
.0
03/01/06
12/31/06
0
0
0
ON S HOMAN AVE FROM W 56TH ST TO W 57TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S HOMAN AVE FROM W 57TH ST TO W 58TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S HOMAN AVE FROM W 58TH ST TO W 59TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KARLOV AVE FROM W 43RD ST TO W 44TH ST
.0
03/01/06
12/31/06
0
0
0
300 09 / 33080
ON S KARLOV AVE FROM W 43RD ST TO W 47TH ST
4.0
04/19/08
05/09/08
0
100
300 07 0014 / 5437
ON S KARLOV AVE FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KARLOV AVE FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KARLOV AVE FROM W 49TH ST TO W 50TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KARLOV AVE FROM W 50TH ST TO S ARCHER AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KEDVALE AVE FROM W 43RD ST TO W 44TH ST
.0
03/01/06
12/31/06
0
0
0
300 09 / 33080
ON S KEDVALE AVE FROM W 43RD ST TO W 47TH ST
4.0
04/19/08
05/09/08
0
100
300 07 0014 / 5437
ON S KEDVALE AVE FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KEDVALE AVE FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KEDVALE AVE FROM W 46TH ST TO W 47TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KEELER AVE FROM W 43RD ST TO W 44TH ST
.0
03/01/06
12/31/06
0
0
0
300 06 / 32277
ON S KEELER AVE FROM W 43RD ST TO W 47TH ST
.0
05/04/08
12/31/08
0
0
0
300 07 0014 / 5437
ON S KEELER AVE FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 09 / 33080
ON S KOMENSKY AVE FROM W 43RD ST TO W 47TH ST
4.0
04/19/08
05/09/08
0
100
158,374 03/07/06
260,000 04/01/08
260,000 04/01/08
260,000 04/01/08
12/01/08
12/01/08
12/01/08
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 154
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0014 / 5437
ON S KOMENSKY AVE FROM W 46TH ST TO W 47TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S KOMENSKY AVE FROM W 49TH ST TO W 50TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MAPLEWOOD AVE FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MAPLEWOOD AVE FROM W 53RD ST TO W 54TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MAPLEWOOD AVE FROM W 54TH ST TO W 55TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM S ARCHER AVE TO W 42ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM W 51ST ST TO W 52ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S MOZART ST FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S RICHMOND ST FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S RICHMOND ST FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S RICHMOND ST FROM W 46TH ST TO W 47TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S RICHMOND ST FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 05 0014 / 5129
ON S RIDGEWAY AVE FROM W 47TH ST TO S ARCHER AVE
1.0
04/04/05
11/18/05
50,024
100
300 07 0014 / 5437
ON S ROCKWELL ST FROM W 53RD ST TO W 54TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SACRAMENTO AVE FROM S ARCHER AVE TO W POPE JOHN PAUL II DR ON S SACRAMENTO AVE FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SACRAMENTO AVE FROM W 46TH ST TO W 47TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SACRAMENTO AVE FROM W 51ST ST TO W 52ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SACRAMENTO AVE FROM W POPE JOHN PAUL II DR TO W 44TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SAWYER AVE FROM W 55TH ST TO W 56TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SAWYER AVE FROM W 56TH ST TO W 57TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SAWYER AVE FROM W 57TH ST TO W 58TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SAWYER AVE FROM W 58TH ST TO W 59TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SPAULDING AVE FROM W 56TH ST TO W 57TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S SPRINGFIELD AVE FROM W 47TH ST TO W 49TH ST
2.0
05/31/06
07/31/06
93,543
100
300 07 0014 / 5437
ON S TROY ST FROM W 45TH ST TO W 46TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S TROY ST FROM W 51ST ST TO W 52ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S TRUMBULL AVE FROM W 55TH ST TO W 56TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S TRUMBULL AVE FROM W 56TH ST TO W 57TH ST
.0
03/01/06
12/31/06
0
0
0
85,000 05/23/05
160,000 05/31/06
07/22/05
07/21/06
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 155
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0014 / 5437
ON S TRUMBULL AVE FROM W 57TH ST TO W 58TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S TRUMBULL AVE FROM W 58TH ST TO W 59TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S WHIPPLE ST FROM W 44TH ST TO W 45TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S WHIPPLE ST FROM W 51ST ST TO W 52ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S WHIPPLE ST FROM W 52ND ST TO W 53RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON S WHIPPLE ST FROM W POPE JOHN PAUL II DR TO W 44TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 42ND ST FROM S MOZART ST TO S FRANCISCO AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 47TH ST FROM S AVERS AVE TO S SPRINGFIELD AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 47TH ST FROM S SPRINGFIELD AVE TO S PULASKI RD
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 53RD ST FROM S SACRAMENTO AVE TO S WHIPPLE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 55TH ST FROM S SPAULDING AVE TO S CHRISTIANA AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 56TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 56TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 57TH PL FROM S CENTRAL PARK AVE TO S LAWNDALE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 57TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 57TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 57TH ST FROM S FRANCISCO AVE TO S RICHMOND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 57TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 58TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 58TH ST FROM S CENTRAL PARK AVE TO S LAWNDALE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
ON W 58TH ST FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
4400-4500 S ALBANY AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0014 / 5437
5100-5200 S CALIFORNIA AVE
.0
03/01/06
12/31/06
0
0
0
1,478,374
443,224
Totals per Residntl Staggered Lighting
23.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 156
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 06 0267 / 5375
ON S LAWNDALE AVE FROM S ARCHER AVE TO W 49TH ST
1.0
08/01/04
10/01/04
75,000 08/17/04
09/17/04
70,604
100
300 06 0235 / 5349
ON S LAWNDALE AVE FROM W 50TH ST TO W 51ST ST
1.0
03/04/03
04/28/03
81,511 03/04/03
04/18/03
70,737
100
300 06 0267 / 5375
ON S RIDGEWAY AVE FROM S ARCHER AVE TO W 49TH ST
1.0
08/01/04
10/01/04
75,000 08/17/04
09/17/04
70,604
100
300 06 0235 / 5349
ON S RIDGEWAY AVE FROM W 50TH ST TO W 51ST ST
1.0
03/04/03
04/28/03
81,511 03/04/03
04/18/03
70,736
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial
4.0
313,022
282,681
Locations
302 00 0092 / 5774
4400 S ALBANY AVE
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
5301 S MOZART ST
1.0
0 03/07/01
03/07/01
378
100
302 00 0092 / 5774
5200 S RICHMOND ST
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
2915 W 38TH PL
1.0
0 04/13/01
04/13/01
378
100
4.0
0
Totals per Short Arm Installs - Arterial
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
5000 S MAPLEWOOD AVE
1,512
Locations 1.0
0 05/16/01
05/16/01
378
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 157
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0108 / 5263
ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE
166.60
05/23/03
06/10/03
61,413 05/23/03
06/26/03
52,420
100
300 05 0014 / 5129
ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD
33.0
04/04/05
11/18/05
9,000 06/01/05
06/20/05
7,138
100
300 03 0012 / 4883
ON S KEDZIE AVE FROM W 36TH ST TO W 39TH PL
6.44
07/01/04
07/20/04
1,694 07/10/04
08/01/04
1,464
100
300 05 0014 / 5129
ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE
24.0
04/04/05
11/18/05
6,500 06/01/05
06/20/05
5,192
100
302 00 0079 / 5767
ON S KEDZIE AVE FROM W 47TH ST TO W 55TH ST
100.0
10/08/01
11/15/01
35,000 10/08/01
11/15/01
17,554
100
300 05 0014 / 5129
ON S LAWNDALE AVE FROM W 47TH ST TO S ARCHER AVE
3.0
04/04/05
11/18/05
750 06/01/05
06/20/05
669
100
300 06 0108 / 5263
ON S PULASKI RD FROM W 40TH ST TO W 51ST ST
181.0
06/01/03
06/10/03
55,450 05/19/03
06/25/03
47,740
100
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
51.48
06/01/04
06/21/04
13,580 05/11/04
06/30/04
14,609
100
300 05 0014 / 5129
ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE
81.0
04/04/05
11/18/05
21,250 10/20/05
10/20/05
17,520
100
302 00 0076 / 5764
ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE
86.90
09/01/00
12/31/00
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
121.54
05/10/04
06/16/04
35,577 05/11/04
06/04/04
27,650
100
302 00 0079 / 5767
ON W PERSHING RD FROM S ARCHER AVE TO S SACRAMENTO AVE
23.94
09/01/02
09/03/02
3,002 09/09/02
10/23/02
3,002
100
302 00 0076 / 5764
W 47TH ST AND S PULASKI RD
104.0
09/01/00
12/31/00
302 00 0077 / 5765
4068 S ARCHER AVE
1.0
0 06/15/99
06/15/99
87
100
302 00 0077 / 5765
4168 S ARCHER AVE
1.0
0 07/29/99
07/29/99
175
100
302 00 0077 / 5765
4100-4115 S CALIFORNIA AVE
2.0
0 07/29/99
07/29/99
175
100
302 00 0076 / 5764
5200-5300 S CALIFORNIA AVE
14.0
06/18/98
06/18/98
0 06/18/98
06/18/98
238
100
302 00 0076 / 5764
5400 S FAIRFIELD AVE
1.0
02/24/98
02/24/98
0 02/24/98
02/24/98
17
100
302 00 0077 / 5765
4125 S FRANCISCO AVE
1.0
0 06/17/99
06/17/99
87
100
302 00 0076 / 5764
5363 S ROCKWELL ST
1.0
02/28/98
02/28/98
0 02/24/98
02/24/98
17
100
302 00 0076 / 5764
5500 S ROCKWELL ST
1.0
02/24/98
02/24/98
0 02/24/98
02/24/98
17
100
Totals per Strt Light Pole Painting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
2650 W 51ST ST
1,004.90
0
1,477
0
1,768
243,215
199,016
Lamps 2,190.0
03/01/04
12/01/04
11,388 07/31/06
09/01/06
23,849
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 158
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2361 / 8547
3828 N PULASKI RD
9.0
11/02/95
11/02/95
0 11/02/95
11/02/95
6,750
100
805 06 2451 / 8637
4700 S ARCHER AVE
23.0
05/20/93
05/20/93
0 05/20/93
05/20/93
17,250
100
805 06 2332 / 8518
4801 S CALIFORNIA AVE
20.0
01/01/91
01/01/91
0 01/01/91
01/01/91
15,000
100
805 06 2290 / 8476
4810 S CALIFORNIA AVE
16.0
01/01/91
01/01/91
0 01/01/91
01/01/91
12,000
100
302 00 0071 / 5759
4900 S CALIFORNIA AVE
0 01/18/99
01/25/99
10,863
100
805 06 2448 / 8634
4822 S KEDZIE AVE
26.0
10/31/95
10/31/95
0 10/31/95
10/31/95
19,500
100
805 06 2271 / 8457
4823 S KEDZIE AVE
16.0
01/01/91
01/01/91
0 01/01/91
01/01/91
12,000
100
300 06 0099 / 5260
2650 W 51ST ST
91.0
10/09/03
10/09/03
5,115 09/26/03
09/26/03
3,510
100
805 06 2445 / 8631
3550 W 58TH ST
8.0
04/08/93
04/08/93
0 04/08/93
04/08/93
6,000
100
Totals per Underpass Lighting
209.0
5,115
102,873
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 159
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S CALIFORNIA AVE AND W 42ND ST
.50
0 08/27/01
08/27/01
3,662
100
210 06 0130 / 4389
S KOSTNER AVE AND W 47TH ST
.50
0 10/18/01
10/18/01
4,270
100
210 06 0130 / 4389
S PULASKI RD AND W 44TH ST
1.0
0 02/08/02
02/08/02
8,539
100
210 06 0219 / 4459
S WESTERN AVE AND W 51ST ST
.50
05/12/05
05/13/05
5,282 04/19/05
04/19/05
4,170
100
210 06 0219 / 4459
S WESTERN AVE AND W 54TH ST
.50
05/13/05
05/14/05
5,282 04/18/05
04/18/05
3,879
100
210 06 0219 / 4459
W 55TH ST AND S WESTERN AVE
.50
05/16/05
05/17/05
5,282 04/15/05
04/15/05
4,523
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0110 / 4370
4100-4199 S PULASKI RD
Work Type: New Signal
3.50
1.0
11/01/00
04/30/01
01/31/02
05/03/02
1.0
210 06 0073 / 4337
4400 S PULASKI RD
1.0
2650 W 51ST ST
Work Type: TSM Install
04/12/01
15,286
95,542
90
06/06/02
170,385
100
163,000 05/23/01
2.0
Work Type: Signals
20,000 11/03/00
100
Locations
4200 S CALIFORNIA AVE
Totals per New Signal
29,042
Locations
210 06 0133 / 4392
300 06 0096 / 5258
15,845
175,000 12/28/01 338,000
265,927
Intersections 42.0
09/21/03
09/28/03
0 08/27/03
09/04/03
6,641
100
Locations
814 06 0296 / 16508
4320 N PULASKI RD
1.0
09/11/91
09/11/91
0 09/11/91
09/11/91
106,875
100
814 06 0103 / 16318
4515 S HOMAN AVE
1.0
09/17/93
09/17/93
0 09/17/93
09/17/93
108,530
100
814 06 0217 / 16429
4699 S HOMAN AVE
1.0
01/27/95
01/27/95
0 01/27/95
01/27/95
125,000
100
814 06 0194 / 16406
3838 S PULASKI RD
1.0
11/13/95
11/13/95
0 11/13/95
11/13/95
125,000
100
4.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
0
465,405
Locations
300 05 0014 / 5129
ON S KEDZIE AVE FROM S ARCHER AVE TO W PERSHING RD
6.0
04/04/05
11/18/05
1,500 06/01/05
06/20/05
1,875
100
300 05 0014 / 5129
ON S KEDZIE AVE FROM W 47TH ST TO S ARCHER AVE
9.0
04/04/05
11/18/05
2,400 06/01/05
06/20/05
2,451
100
300 05 0014 / 5129
ON W 51ST ST FROM S WESTERN AVE TO S ST LOUIS AVE
26.0
04/04/05
11/18/05
7,900 10/20/05
10/20/05
8,364
100
Totals per Traffic Equipment Painting
41.0
11,800
12,690
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 160
1/1/2008 AND 12/31/2008
Ward 14 Edward M. Burke CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Reloc 300 06 0286 / 5394
2420 W 54TH ST
Totals per Traffic
Locations 2.0
05/01/05
06/01/05
43,000 05/09/05
06/01/05
30,498
428,645
825,489
Totals per Construction Phase
3,532,286
2,701,473
Totals for Ward 14
4,092,286
2,785,334
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 161
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST
.0
04/01/08
08/30/08
0
0
0
300 06 0308 / 5414
ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,414
100
210 06 0243 / 4480
W 61ST ST AND S KEDZIE AVE
.0
12/27/06
01/26/07
300 06 0292 / 5399
5840 S ASHLAND AVE
1.0
300 06 0292 / 5399
6312 S PAULINA ST
1.0
06/29/05
300 06 0292 / 5399
1634 W 59TH ST
.0
01/20/05
Totals per Design/Engineering
2.0
250 12/27/06
01/26/07
1,594
100
1,000 01/03/05
03/03/05
559
100
07/19/05
1,000 06/29/05
07/19/05
0
100
12/21/05
0 01/20/05
12/21/05
0
0
2,250
4,567
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 162
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 05 0015 / 5130
ON S ARTESIAN AVE FROM W 60TH ST TO W MARQUETTE RD
26.0
04/04/05
11/18/05
10,800 06/15/05
06/28/05
5,980
100
300 05 0015 / 5130
ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD
25.0
04/04/05
11/18/05
10,400 06/15/05
06/28/05
5,750
100
300 05 0015 / 5130
ON S MAPLEWOOD AVE FROM W 60TH ST TO W MARQUETTE RD
26.0
04/04/05
11/18/05
10,800 06/15/05
06/28/05
5,980
100
300 05 0015 / 5130
ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD
25.0
04/04/05
11/18/05
10,400 06/15/05
06/28/05
5,750
100
300 05 0015 / 5130
ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST
26.0
04/04/05
11/18/05
10,800 06/15/05
06/28/05
5,980
100
300 03 0015 / 4886
ON S WOOD ST FROM W 55TH ST TO W 57TH ST
10.0
09/20/04
09/26/04
3,950 10/04/04
10/05/04
2,401
100
300 06 0069 / 5233
6400 S ARTESIAN AVE
5.0
0 07/15/02
07/15/02
1,875
100
302 00 0092 / 5774
6400 S CAMPBELL AVE
2.0
0 08/20/01
08/20/01
412
100
302 00 0092 / 5774
6400-6499 S CAMPBELL AVE
5.0
09/03/01
09/04/01
1,029 08/20/01
08/20/01
1,029
100
302 00 0092 / 5774
6500 S CAMPBELL AVE
5.0
10/03/01
10/03/01
1,029 11/12/01
11/12/01
1,029
100
302 00 0092 / 5774
6509 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6527 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6545 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6559 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6801 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6813 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6829 S CAMPBELL AVE
1.0
0 11/12/01
11/12/01
206
100
210 06 0022 / 4297
5500-5599 S HONORE ST
5.0
0 02/21/02
02/21/02
1,875
100
300 06 0069 / 5233
5500-5599 S HONORE ST
5.0
1,875 02/21/02
02/21/02
1,875
100
302 00 0092 / 5774
6300-6399 S MAPLEWOOD AVE
4.0
10/24/01
10/24/01
1,029 09/29/01
09/29/01
824
100
302 00 0092 / 5774
6100-6199 S RICHMOND ST
5.0
11/01/01
11/01/01
1,029 11/21/01
11/21/01
1,029
100
302 00 0092 / 5774
6443 S ROCKWELL ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
6459 S ROCKWELL ST
1.0
0 11/12/01
11/12/01
206
100
300 06 0069 / 5233
6201 S WOLCOTT AVE
1.0
06/20/02
06/20/02
210 06/17/02
06/17/02
203
100
300 06 0069 / 5233
3500 W 66TH PL
4.0
09/29/02
09/29/02
840 09/26/02
09/26/02
812
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 03 0015 / 4886
ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE
Totals per Lighting/Electrical
188.0
64,191
44,658
Fixtures 67.0
09/20/04
09/26/04
27,200 08/16/04 1,339,688
08/24/04
17,462 1,235,310
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 163
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0728 / 6914
6123 S ALBANY AVE
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0729 / 6915
6141 S ALBANY AVE
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0730 / 6916
6223 S ALBANY AVE
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0731 / 6917
6243 S ALBANY AVE
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0747 / 6933
6403 S ARTESIAN AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
302 00 0083 / 5768
6154 S ASHLAND AVE
0 10/30/97
10/30/97
267
100
805 06 1248 / 7434
6154 S ASHLAND AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 0750 / 6936
6159 S ASHLAND AVE
1.0
06/22/95
06/22/95
0 06/22/95
06/22/95
300
100
302 00 0083 / 5768
6648 S ASHLAND AVE
0 10/30/97
10/30/97
267
100
805 06 1250 / 7436
6648 S ASHLAND AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1866 / 8052
6219 S CLAREMONT AVE
1.0
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
302 00 0083 / 5768
6700 S CLAREMONT AVE
0 10/30/97
10/30/97
266
100
805 06 1258 / 7444
6700 S CLAREMONT AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
6643 S DAMEN AVE
0 10/15/97
10/15/97
266
100
805 06 1249 / 7435
6643 S DAMEN AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
5916 S HERMITAGE AVE
0 10/15/97
10/15/97
266
100
805 06 1246 / 7432
5916 S HERMITAGE AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
5914 S HONORE ST
0 10/15/97
10/15/97
266
100
805 06 1272 / 7458
5914 S HONORE ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
6658 S HOYNE AVE
0 10/15/97
10/15/97
266
100
805 06 1253 / 7439
6658 S HOYNE AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1467 / 7653
5500 S MARSHFIELD AVE
3.0
12/03/97
12/03/97
0 12/03/97
12/03/97
900
100
302 00 0083 / 5768
5527 S MARSHFIELD AVE
0 10/15/97
10/15/97
267
100
805 06 1267 / 7453
5527 S MARSHFIELD AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
5915 S MARSHFIELD AVE
0 12/09/97
12/09/97
266
100
805 06 1274 / 7460
5915 S MARSHFIELD AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
6658 S OAKLEY AVE
0 12/09/97
12/09/97
266
100
805 06 1254 / 7440
6658 S OAKLEY AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
5911 S PAULINA ST
0 12/09/97
12/09/97
266
100
805 06 1271 / 7457
5911 S PAULINA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
6045 S PAULINA ST
0 12/09/97
12/09/97
267
100
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 164
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1247 / 7433
6045 S PAULINA ST
302 00 0083 / 5768
6656 S ROCKWELL ST
805 06 1252 / 7438
6656 S ROCKWELL ST
1.0
12/05/97
805 06 0705 / 6891
6500 S SACRAMENTO AVE
1.0
08/16/96
302 00 0083 / 5768
6658 S SEELEY AVE
805 06 1255 / 7441
6658 S SEELEY AVE
1.0
12/05/97
805 06 0422 / 6608
6100 S TALMAN AVE
1.0
10/23/96
302 00 0083 / 5768
6655 S WASHTENAW AVE
805 06 1251 / 7437
6655 S WASHTENAW AVE
302 00 0083 / 5768
5524 S WINCHESTER AVE
805 06 1263 / 7449
5524 S WINCHESTER AVE
302 00 0083 / 5768
5525 S WINCHESTER AVE
805 06 1265 / 7451
5525 S WINCHESTER AVE
302 00 0083 / 5768
5637 S WINCHESTER AVE
805 06 1269 / 7455
5637 S WINCHESTER AVE
302 00 0083 / 5768
5527 S WOLCOTT AVE
805 06 1268 / 7454
5527 S WOLCOTT AVE
302 00 0083 / 5768
5914 S WOLCOTT AVE
805 06 1273 / 7459
5914 S WOLCOTT AVE
302 00 0083 / 5768
5519 S WOOD ST
805 06 1262 / 7448
5519 S WOOD ST
302 00 0083 / 5768
5526 S WOOD ST
805 06 1266 / 7452
5526 S WOOD ST
1.0
302 00 0092 / 5774
5700 S WOOD ST
1.0
805 06 1783 / 7969
6019 S WOOD ST
1.0
302 00 0083 / 5768
6658 S WOOD ST
805 06 1257 / 7443
6658 S WOOD ST
302 00 0083 / 5768
1.0
0 12/05/97
12/05/97
300
100
0 12/09/97
12/09/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
08/16/96
0 08/16/96
08/16/96
300
100
0 12/09/97
12/09/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
10/23/96
0 10/23/96
10/23/96
300
100
0 12/12/97
12/12/97
267
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
266
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
266
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
266
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
267
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
267
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
267
100
0 12/05/97
12/05/97
300
100
0 09/17/97
09/17/97
267
100
0 12/05/97
12/05/97
300
100
0 06/26/01
06/26/01
236
100
0 04/30/97
04/30/97
300
100
0 09/17/97
09/17/97
267
100
0 12/05/97
12/05/97
300
100
1735 W 55TH ST
0 08/20/97
08/20/97
267
100
302 00 0083 / 5768
1935 W 55TH ST
0 08/20/97
08/20/97
267
100
302 00 0083 / 5768
1955 W 55TH ST
0 08/20/97
08/20/97
267
100
302 00 0083 / 5768
1955 W 59TH ST
0 08/20/97
08/20/97
266
100
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
04/30/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
04/30/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 165
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1435 / 7621
1955 W 59TH ST
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1027 / 7213
3432 W 62ND ST
1.0
06/23/95
06/23/95
0 06/23/95
06/23/95
300
100
805 06 1061 / 7247
3221 W 63RD PL
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
805 06 1063 / 7249
3239 W 63RD PL
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
805 06 1064 / 7250
3301 W 63RD PL
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
805 06 1065 / 7251
3324 W 63RD PL
1.0
01/10/95
01/10/95
0 01/10/95
01/10/95
300
100
805 06 1048 / 7234
3341 W 63RD PL
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
805 06 1037 / 7223
3403 W 63RD PL
1.0
08/17/95
08/17/95
0 08/17/95
08/17/95
300
100
805 06 1060 / 7246
3423 W 63RD PL
1.0
08/18/95
08/18/95
0 08/18/95
08/18/95
300
100
302 00 0083 / 5768
1955 W 63RD ST
0 12/10/97
12/10/97
266
100
805 06 1436 / 7622
1955 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1957 W 63RD ST
0 12/10/97
12/10/97
266
100
805 06 1437 / 7623
1957 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2006 W 63RD ST
0 12/10/97
12/10/97
267
100
805 06 1440 / 7626
2006 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2032 W 63RD ST
0 12/10/97
12/10/97
267
100
805 06 1411 / 7597
2032 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2100 W 63RD ST
0 12/10/97
12/10/97
267
100
805 06 1413 / 7599
2100 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2300 W 63RD ST
0 12/10/97
12/10/97
267
100
805 06 1416 / 7602
2300 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2332 W 63RD ST
0 12/10/97
12/10/97
267
100
805 06 1418 / 7604
2332 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2355 W 63RD ST
0 12/10/97
12/10/97
266
100
805 06 1422 / 7608
2355 W 63RD ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2434 W 63RD ST
0 12/10/97
12/10/97
266
100
805 06 1425 / 7611
2434 W 63RD ST
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
300 06 0096 / 5258
2440 W 63RD ST
1,414.0
03/01/03
09/01/03
0 03/01/06
09/01/06
42,723
0
302 00 0092 / 5774
2440 W 63RD ST
35.0
0 02/02/01
01/29/02
8,248
100
302 00 0083 / 5768
2441 W 63RD ST
0 12/10/97
12/10/97
266
100
805 06 1397 / 7583
2441 W 63RD ST
0 12/05/97
12/05/97
300
100
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 166
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0083 / 5768
2506 W 63RD ST
805 06 1400 / 7586
2506 W 63RD ST
302 00 0083 / 5768
2541 W 63RD ST
805 06 1404 / 7590
2541 W 63RD ST
302 00 0083 / 5768
2606 W 63RD ST
805 06 1405 / 7591
2606 W 63RD ST
302 00 0083 / 5768
2754 W 63RD ST
805 06 1407 / 7593
2754 W 63RD ST
302 00 0083 / 5768
2755 W 63RD ST
805 06 1408 / 7594
2755 W 63RD ST
1.0
12/05/97
805 06 1042 / 7228
2835 W 63RD ST
1.0
805 06 1044 / 7230
3217 W 63RD ST
805 06 1029 / 7215
0 12/10/97
12/10/97
266
100
0 12/05/97
12/05/97
300
100
0 12/10/97
12/10/97
266
100
0 12/05/97
12/05/97
300
100
0 12/10/97
12/10/97
267
100
0 12/05/97
12/05/97
300
100
0 12/10/97
12/10/97
267
100
0 12/05/97
12/05/97
300
100
0 12/10/97
12/10/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
1.0
01/06/95
01/06/95
0 01/06/95
01/06/95
300
100
3415 W 63RD ST
1.0
08/18/95
08/18/95
0 08/18/95
08/18/95
300
100
805 06 1045 / 7231
3433 W 63RD ST
1.0
08/18/95
08/18/95
0 08/18/95
08/18/95
300
100
805 06 1005 / 7191
3211 W 64TH PL
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 1004 / 7190
3415 W 64TH PL
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 0976 / 7162
3433 W 64TH PL
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 0980 / 7166
3227 W 64TH ST
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 0964 / 7150
3415 W 64TH ST
1.0
06/08/95
06/08/95
0 06/08/95
06/08/95
300
100
805 06 0982 / 7168
3435 W 64TH ST
1.0
06/08/95
06/08/95
0 06/08/95
06/08/95
300
100
805 06 0987 / 7173
3407 W 65TH PL
1.0
03/12/95
03/12/95
0 03/12/95
03/12/95
300
100
805 06 0988 / 7174
3209 W 65TH ST
1.0
06/08/95
06/08/95
0 06/08/95
06/08/95
300
100
805 06 0961 / 7147
3401 W 66TH ST
1.0
03/17/95
03/17/95
0 03/17/95
03/17/95
300
100
805 06 1458 / 7644
3518 W 66TH ST
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
302 00 0083 / 5768
2436 W 69TH ST
0 11/07/97
11/07/97
266
100
302 00 0083 / 5768
2502 W 69TH ST
0 11/07/97
11/07/97
266
100
805 06 1426 / 7612
1643 W GARFIELD BLVD
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1429 / 7615
1735 W GARFIELD BLVD
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1433 / 7619
1935 W GARFIELD BLVD
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1434 / 7620
1955 W GARFIELD BLVD
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1396 / 7582
2436 W LITHUANIAN PLAZA CT
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 167
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1399 / 7585
2502 W LITHUANIAN PLAZA CT
302 00 0083 / 5768
1842 W MARQUETTE RD
1.0
805 06 1431 / 7617
1842 W MARQUETTE RD
302 00 0083 / 5768
2506 W MARQUETTE RD
805 06 1402 / 7588
2506 W MARQUETTE RD
1.0
12/05/97
805 06 1890 / 8076
3400 W MARQUETTE RD
1.0
805 06 1861 / 8047
3422 W MARQUETTE RD
805 06 1862 / 8048
3434 W MARQUETTE RD
300 06 0053 / 5228
12/05/97
300
100
0 09/02/97
09/02/97
266
100
0 12/05/97
12/05/97
300
100
0 09/02/97
09/02/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
03/17/95
03/17/95
0 03/17/95
03/17/95
300
100
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
1.0
03/20/95
03/20/95
0 03/20/95
03/20/95
300
100
12/05/97
12/05/97
12/05/97
1,535.0
Totals per Alley Lighting/Lamps
Work Type: Arterial Strt Lighting/Lamps
0 12/05/97
1.0
12/05/97
0
88,967
Installations
2440 W 63RD ST
1,194.0
0 07/17/02
07/20/02
21,740
100
Fixtures
Work Type: Flood Light Install 300 09 / 33081
ON S WASHTENAW AVE FROM W 68TH ST TO W LITHUANIAN PLAZA CT
4.0
2,000 10/22/08
10/23/08
2,556
100
300 06 0167 / 5306
S ARTESIAN AVE AND W 70TH ST
.50
0 01/06/99
01/06/99
176
100
302 00 0092 / 5774
6001 S CALIFORNIA AVE
1.0
0 04/13/01
04/13/01
471
100
300 06 0167 / 5306
3255 W 65TH PL
1.0
0 04/07/99
04/07/99
351
100
300 06 0167 / 5306
3355 W 65TH PL
1.0
0 04/07/99
04/07/99
351
100
300 06 0167 / 5306
3357 W 65TH ST
1.0
0 04/07/99
04/07/99
351
100
300 06 0167 / 5306
3259 W 66TH ST
1.0
0 04/07/99
04/07/99
351
100
300 06 0167 / 5306
3357 W 66TH ST
1.0
0 04/07/99
04/07/99
351
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
6312 S PAULINA ST
300 06 0292 / 5399
1634 W 59TH ST
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting 300 06 0069 / 5233
ON S FAIRFIELD AVE FROM W 64TH ST TO W 65TH ST
10/22/08
10/23/08
10.50
2,000
4,958
Installations .0
03/01/05
12/31/05
6,209 08/19/05
08/25/05
3,074
100
1.0
02/16/05
05/12/06
33,000 02/16/05
05/12/06
23,063
100
1.0
39,209
26,137
Fixtures 5.0
7,900 08/01/02
08/01/02
7,435
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 168
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residential Regrouping 300 06 0270 / 5378
3045 W 63RD ST
Work Type: Residntl Staggered Lighting 300 06 / 32277
ON S HERMITAGE AVE FROM W MARQUETTE RD TO W 65TH ST
300 11 / 32204
ON S MARSHFIELD AVE FROM W 56TH ST TO W 58TH ST
300 11 / 32204 300 05 0015 / 5130
Lamps .0
03/01/08
12/01/08
0
.0
05/04/08
12/31/08
12/12/07
03/26/08
150,000 01/07/08
ON S MARSHFIELD AVE FROM W 64TH ST TO W MARQUETTE RD
3.0
12/26/07
03/26/08
175,000 01/07/08
ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST
.08
04/13/06
06/16/06
300 07 0015 / 5438
ON S TALMAN AVE FROM W 60TH ST TO W 61ST ST
1.0
04/13/06
300 06 0308 / 5414
ON S TALMAN AVE FROM W 61ST ST TO W 63RD ST
2.0
03/16/06
300 07 0017 / 5440
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
12/31/06
300 07 0017 / 5440
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
03/01/06
12/31/06
300 05 0015 / 5130
5500-5600 S MARSHFIELD AVE
.0
12/08/06
Work Type: Residntl Strt Lighting/Lamps
0
Blocks 2.50
Totals per Residntl Staggered Lighting
0
0
0
0
05/09/08
135,215
100
0
75
50,365 04/13/06
06/09/06
47,500
100
06/16/06
14,635 04/13/06
06/09/06
48,140
100
12/31/06
193,058 04/13/06
06/09/06
119,524
100
0
0
0
0
0
0
65,000
0
0
648,058
350,379
8.58
Blocks
300 06 0235 / 5349
ON S HOYNE AVE FROM W 63RD ST TO W 65TH ST
2.0
08/01/03
10/01/03
157,731 07/09/03
10/27/03
145,862
100
300 06 0267 / 5375
ON S SEELEY AVE FROM W 63RD ST TO W 65TH ST
2.0
10/01/04
11/20/04
176,401 09/24/04
12/21/04
162,993
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
4.0
334,132
308,855
Locations
302 00 0092 / 5774
6400 S WHIPPLE ST
1.0
0 05/16/01
05/16/01
378
100
302 00 0092 / 5774
6427 S WHIPPLE ST
1.0
0 05/16/01
05/16/01
378
100
302 00 0092 / 5774
6300 S WOOD ST
1.0
0 05/10/01
05/10/01
378
100
3.0
0
Totals per Short Arm Installs - Residntl
1,134
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 169
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 05 0015 / 5130
ON S ARTESIAN AVE FROM W 68TH ST TO W 60TH ST
31.0
04/04/05
11/18/05
10,500 06/15/05
06/21/05
4,470
100
300 05 0015 / 5130
ON S CAMPBELL AVE FROM W 60TH ST TO W MARQUETTE RD
31.0
04/04/05
11/18/05
8,800 06/15/05
06/21/05
4,470
100
300 04 0216 / 5114
ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST
22.50
05/01/06
11/01/06
4,867 05/17/06
10/10/06
4,867
100
300 05 0015 / 5130
ON S MAPLEWOOD AVE FROM W 68TH ST TO W 60TH ST
31.0
04/04/05
11/18/05
8,400 06/15/05
06/21/05
4,470
100
300 05 0015 / 5130
ON S ROCKWELL ST FROM W 60TH ST TO W MARQUETTE RD
30.0
04/04/05
11/18/05
10,500 06/15/05
06/21/05
4,326
100
300 05 0015 / 5130
ON S TALMAN AVE FROM W 68TH ST TO W 60TH ST
29.0
04/04/05
11/18/05
8,400 06/15/05
06/21/05
4,182
100
302 00 0076 / 5764
ON W 63RD ST FROM S CALIFORNIA AVE TO S ST LOUIS AVE
112.0
09/01/00
12/31/00
300 03 0015 / 4886
ON W 63RD ST FROM S CALIFORNIA AVE TO S WESTERN AVE
302 00 0076 / 5764
ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE
300 07 0017 / 5440 300 07 0017 / 5440
72.0
09/20/04
09/26/04
09/01/00
12/31/00
0
673
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
12/31/06
0
0
0
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
03/01/06
12/31/06
0
0
0
71,367
46,378
Work Type: Strt Lighting 300 06 0247 / 5357
ON S HAMILTON AVE FROM W 63RD ST TO W 64TH ST
300 06 0266 / 5374
6315 S CLAREMONT AVE
398.10
Work Type: Traffic Signal Regrouping 2440 W 63RD ST
07/14/04
17,016
100
Blocks 1.0 01/10/04
03/25/04
1.0
Totals per Strt Lighting
19,900 07/07/04
1,904
39.60
Totals per Strt Light Pole Painting
300 06 0139 / 5289
0
55,000 06/07/04
07/26/04
52,307
100
51,000 01/10/04
03/25/04
39,325
100
106,000
91,632
Lamps 951.0
03/01/04
12/01/04
4,945 07/31/06
09/05/06
10,356
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 170
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2894 / 9080
5899 S ASHLAND AVE
6.0
03/15/92
03/15/92
0 03/15/92
03/15/92
4,500
100
805 06 2533 / 8719
5801 S DAMEN AVE
6.0
03/01/92
03/01/92
0 03/01/92
03/01/92
4,500
100
805 06 2499 / 8685
5801 S HONORE ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
302 00 0071 / 5759
5830 S HONORE ST
0 11/05/98
11/11/98
6,985
100
805 06 2876 / 9062
5801 S JUSTINE ST
6.0
0 01/02/92
01/02/92
4,500
100
302 00 0072 / 5760
5800 S LAFLIN ST
1.0
0 03/09/00
03/16/00
10,313
100
805 06 2515 / 8701
5899 S PAULINA ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2482 / 8668
5899 S WINCHESTER AVE
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2530 / 8716
5899 S WOLCOTT AVE
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2544 / 8730
5899 S WOOD ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2489 / 8675
2135 W 63RD ST
17.0
12/08/95
12/08/95
0 12/08/95
12/08/95
12,750
100
805 06 2488 / 8674
2195 W 63RD ST
72.0
12/08/95
12/08/95
0 12/08/95
12/08/95
54,000
100
300 06 0099 / 5260
2440 W 63RD ST
85.0
10/10/03
10/13/03
4,755 09/26/03
10/02/03
10,174
100
300 06 0217 / 5337
2440 W 63RD ST
532.0
03/30/04
04/12/04
29,931 09/29/03
10/02/03
18,998
805 06 2340 / 8526
2218 W 65TH ST
88.0
04/04/96
04/04/96
0 04/04/96
04/04/96
66,000
Totals per Underpass Lighting
843.0
01/02/92
01/02/92
34,686
215,220
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 171
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S ASHLAND AVE AND W 59TH ST
1.0
05/07/05
05/07/05
10,653 07/05/05
07/07/05
210 06 0219 / 4459
S ASHLAND AVE AND W MARQUETTE RD
.50
05/06/05
05/06/05
5,327 07/01/05
07/05/05
0
210 06 0219 / 4459
S WESTERN AVE AND W 61ST ST
.50
05/18/05
05/19/05
5,282 04/13/05
04/13/05
4,035
100
210 06 0219 / 4459
S WESTERN AVE AND W 62ND ST
1.0
05/19/05
05/20/05
10,563 04/12/05
04/12/05
6,925
100
210 06 0219 / 4459
S WESTERN AVE AND W 65TH ST
1.0
05/21/05
05/22/05
10,563 04/11/05
04/11/05
8,368
100
210 06 0219 / 4459
S WESTERN AVE AND W MARQUETTE RD
.50
05/23/05
05/24/05
5,282 03/25/05
03/25/05
4,004
100
300 06 0225 / 5340
W 63RD ST AND S WESTERN AVE
1.0
06/01/05
07/01/05
6,105 06/01/04
06/10/04
6,105
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0231 / 4470
S KEDZIE AVE AND W MARQUETTE RD
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W 61ST ST AND S KEDZIE AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
W 63RD ST AND S ST LOUIS AVE
Work Type: Signals 300 06 0096 / 5258
2440 W 63RD ST
Work Type: TSM Install
5.50
0
53,774
29,437
122,192
0
0
Locations .0
03/01/08
12/01/08
03/15/06
05/08/07
Locations .0
6,000 02/22/07
03/20/07
2,491
100
4,000 06/07/01
04/08/02
113
100
Crossings 1.0
Intersections 32.0
09/07/03
09/16/03
0 08/21/06
08/27/06
5,060
100
Locations
814 06 0259 / 16471
5700 S ASHLAND AVE
1.0
07/21/89
07/21/89
0 07/21/89
07/21/89
75,136
100
814 06 0258 / 16470
6100 S ASHLAND AVE
1.0
08/08/89
08/08/89
0 08/08/89
08/08/89
75,136
100
814 06 0277 / 16489
6699 S ST LOUIS AVE
1.0
03/22/89
03/22/89
0 03/22/89
03/22/89
65,000
100
210 06 0072 / 4336
6700 S WOOD ST
1.0
02/10/00
04/15/00
117,452 02/02/00
04/03/00
105,461
100
4.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
117,452
320,733
Locations
300 07 0017 / 5440
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
03/01/06
12/31/06
0
0
0
0
0
Totals per Traffic Equipment Painting
.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 172
1/1/2008 AND 12/31/2008
Ward 15 Toni Foulkes CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Traffic Totals per Traffic
303,418
357,834
Totals per Construction Phase
1,643,105
1,593,144
Totals for Ward 15
1,645,355
1,597,710
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 173
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0304 / 5410
ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST
.0
08/01/05
10/15/05
0 05/07/05
06/29/05
0
100
300 06 0308 / 5414
ON W 60TH PL FROM S HALSTED ST TO S UNION AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
774
100
300 06 0308 / 5414
ON W 61ST ST FROM S HALSTED ST TO S UNION AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
774
100
210 06 0243 / 4480
W 61ST ST AND S KEDZIE AVE
.0
12/27/06
01/26/07
250 12/27/06
01/26/07
1,594
100
Totals per Design/Engineering
.0
250
3,142
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 174
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 11 / 32205
16TH WARD YARD
1,458.0
03/01/07
12/31/07
588,200 09/01/07
0
100
300 06 0069 / 5233
5954 S ALBANY AVE
1.0
04/22/02
04/22/02
210 04/19/02
04/19/02
203
100
302 00 0092 / 5774
5000-5099 S HERMITAGE AVE
6.0
10/20/01
10/20/01
1,029 10/03/01
10/03/01
1,236
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
Totals per Lighting/Electrical
1,465.0
589,439
1,439
Fixtures 30.56
05/01/04
05/15/04
12,224 05/10/04 2,192,916
05/16/04
4,343 1,266,641
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 175
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0789 / 6975
6429 S ABERDEEN ST
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0779 / 6965
6439 S ABERDEEN ST
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0752 / 6938
5915 S ALBANY AVE
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0738 / 6924
5822 S ARTESIAN AVE
1.0
02/04/97
02/04/97
0 02/04/97
02/04/97
300
100
805 06 1656 / 7842
5942 S CAMPBELL AVE
1.0
07/30/97
07/30/97
0 07/30/97
07/30/97
300
100
805 06 1518 / 7704
5836 S CARPENTER ST
1.0
10/30/97
10/30/97
0 10/30/97
10/30/97
300
100
805 06 0797 / 6983
6432 S CARPENTER ST
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 1210 / 7396
4932 S HOYNE AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 1194 / 7380
4954 S HOYNE AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
805 06 1786 / 7972
6312 S MAY ST
1.0
10/07/96
10/07/96
0 10/07/96
10/07/96
300
100
805 06 1804 / 7990
6320 S MAY ST
1.0
10/07/96
10/07/96
0 10/07/96
10/07/96
300
100
805 06 1825 / 8011
6415 S MAY ST
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 1806 / 7992
6439 S MAY ST
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 1927 / 8113
6401 S MORGAN ST
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 1973 / 8159
6445 S MORGAN ST
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 0649 / 6835
5024 S RACINE AVE
1.0
04/07/95
04/07/95
0 04/07/95
04/07/95
300
100
805 06 0681 / 6867
6345 S RACINE AVE
1.0
02/10/97
02/10/97
0 02/10/97
02/10/97
300
100
805 06 0615 / 6801
6419 S RACINE AVE
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 0366 / 6552
6005 S TROY ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
302 00 0092 / 5774
5143 S WESTERN BLVD
1.0
0 09/27/01
09/27/01
236
100
805 06 0453 / 6639
5939 S WHIPPLE ST
1.0
0 02/17/95
02/17/95
300
100
302 00 0092 / 5774
1420 W 50TH ST
1.0
0 06/18/01
06/18/01
236
100
805 06 1019 / 7205
2114 W 50TH ST
1.0
0 01/26/95
01/26/95
300
100
302 00 0083 / 5768
1634 W 55TH ST
0 08/20/97
08/20/97
267
100
302 00 0083 / 5768
2413 W 59TH ST
0 08/20/97
08/20/97
266
100
805 06 1423 / 7609
2413 W 59TH ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2537 W 59TH ST
0 08/20/97
08/20/97
266
100
805 06 1403 / 7589
2537 W 59TH ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
2757 W 59TH ST
0 08/20/97
08/20/97
267
100
805 06 1409 / 7595
2757 W 59TH ST
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1036 / 7222
1405 W 62ND ST
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
1.0
1.0
02/17/95
01/26/95
12/05/97
12/05/97
02/17/95
01/26/95
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 176
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0139 / 5289
1249 W 63RD ST
1,339.0
302 00 0092 / 5774
1351 W 63RD ST
32.0
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
1249 W 63RD ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1351 W 63RD ST
Work Type: Flood Light Install 300 06 0167 / 5306
W 55TH ST AND S CALIFORNIA AVE
302 00 0092 / 5774
5900 S ELIZABETH ST
300 06 0071 / 5234
1301 W 52ND ST
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0304 / 5410
ON S HALSTED ST FROM W ENGLEWOOD AVE TO W 63RD ST
03/01/06
09/01/06
1,398.0
32,312 04/01/06
04/16/06
40,457
100
0 01/06/01
01/09/02
7,541
100
32,312
57,036
Lamps 1,505.0
06/01/07
12/31/07
44,307 12/05/07
12/18/07
42,967
100
0 07/12/02
07/15/02
25,673
100
2.50
0 12/08/99
12/08/99
376
100
2.0
0 04/06/01
04/06/01
941
100
0 09/25/00
09/26/00
9,000
100
Installations 1,410.0
Fixtures
01/01/00
12/30/00
4.50
0
10,317
Installations 1.0
09/01/05
08/15/06
145,000 09/22/05
06/30/06
12,093
100
05/01/04
05/15/04
4,320 05/10/04
05/21/04
4,618
100
03/01/08
12/01/08
0
0
CONTRACTOR TOOK OVER JOB Note Last Updated on 04-MAR-09
Work Type: Ornamental - Piggyback Lighting 300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
Work Type: Residential Regrouping 300 06 0270 / 5378
5411 S ASHLAND AVE
Fixtures 3.20
Lamps .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 177
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 06 0298 / 5405
ON S LOOMIS BLVD FROM W 59TH ST TO W 61ST ST
2.0
116,079
100
300 09 / 33082
ON S SAWYER AVE FROM W 59TH ST TO W 61ST ST
2.0
130,000
0
0
300 09 / 33082
ON S SPAULDING AVE FROM W 59TH ST TO W 61ST ST
2.0
22,683
0
0
300 09 / 33082
ON S TROY ST FROM W 59TH ST TO W 61ST ST
2.0
130,000
0
0
300 06 0308 / 5414
ON W 60TH PL FROM S HALSTED ST TO S UNION AVE
1.0
03/16/06
12/31/06
64,482 10/17/06
35,638
80
300 06 0308 / 5414
ON W 61ST ST FROM S HALSTED ST TO S UNION AVE
1.0
03/16/06
12/31/06
64,482 10/17/06
35,638
80
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0 09/08/05
10.0
12/19/05
411,647
187,355
Blocks
300 06 0235 / 5349
ON S CALIFORNIA AVE FROM W 55TH ST TO W 57TH ST
2.0
06/01/03
08/01/03
148,623 05/30/03
07/31/03
136,196
100
300 06 0267 / 5375
ON S CALIFORNIA AVE FROM W 57TH ST TO W 59TH ST
2.0
05/29/04
08/29/04
147,831 06/01/04
08/13/04
135,820
100
300 06 0069 / 5233
ON S GREEN ST FROM W 64TH ST TO W 66TH ST
2.0
12/15/04
02/28/05
120,000 11/01/04
03/29/05
90,402
100
300 06 0069 / 5233
ON S PEORIA ST FROM W 64TH ST TO W 66TH ST
1.0
12/15/04
02/28/05
60,000 11/01/04
03/29/05
45,201
100
300 06 0166 / 5305
5500-5600 S MAY ST
1.0
09/12/00
09/26/00
65,600 09/12/00
09/26/00
53,770
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Strt Light Pole Painting
8.0
542,054
461,389
Locations
300 06 0058 / 5229
16TH WARD YARD
.0
04/01/02
10/31/02
0
0
300 11 / 32205
16TH WARD YARD
1,458.0
03/01/07
12/31/07
291,600 08/17/07
11/05/07
0
100
300 04 0216 / 5114
ON S KEDZIE AVE FROM W 59TH ST TO W 63RD ST
22.50
05/01/06
11/01/06
4,867 05/17/06
10/10/06
4,867
100
300 04 0216 / 5114
ON S WESTERN AVE FROM W 47TH ST TO W 49TH ST
15.50
05/01/06
11/01/06
3,317 05/17/06
10/01/06
3,317
100
302 00 0076 / 5764
ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE
23.10
09/01/00
12/31/00
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
32.96
05/10/04
06/16/04
9,648 05/11/04
06/04/04
7,498
100
302 00 0076 / 5764
5700 S CALIFORNIA AVE
1.0
02/24/98
02/24/98
0 02/24/98
02/24/98
17
100
302 00 0076 / 5764
5514-5543 S TALMAN AVE
4.0
02/24/98
02/24/98
0 02/24/98
02/24/98
68
100
Totals per Strt Light Pole Painting
1,557.06
Work Type: Strt Lighting
Blocks
300 06 0247 / 5357
ON W 58TH ST FROM S OAKLEY AVE TO S WESTERN AVE
2.0
0
0
393
309,431
07/01/04
08/01/04
80,000 07/06/04
16,159
08/26/04
79,383
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 178
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
1249 W 63RD ST
Lamps 1,304.0
03/01/04
12/01/04
6,781 07/31/06
09/06/06
14,201
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 179
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2748 / 8934
1524 E 56TH ST
18.0
01/02/92
01/02/92
0 01/02/92
01/02/92
13,500
100
805 06 2966 / 9152
5801 S ABERDEEN ST
6.0
02/05/92
02/05/92
0 02/05/92
02/05/92
4,500
100
302 00 0072 / 5760
5830 S ABERDEEN ST
1.0
0 02/04/00
02/14/00
8,800
100
805 06 2892 / 9078
5801 S ADA ST
6.0
0 01/02/92
01/02/92
4,500
100
302 00 0072 / 5760
5830 S ADA ST
1.0
0 02/14/00
02/21/00
9,800
100
805 06 2895 / 9081
5801 S BISHOP ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2964 / 9150
5801 S CARPENTER ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
302 00 0072 / 5760
5830 S CARPENTER ST
1.0
0 02/22/00
02/29/00
10,000
100
805 06 2110 / 8296
4905 S DAMEN AVE
4.0
11/01/93
11/01/93
0 11/01/93
11/01/93
3,000
100
805 06 2896 / 9082
5801 S ELIZABETH ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2963 / 9149
5801 S GREEN ST
6.0
01/01/93
01/01/93
0 01/01/93
01/01/93
4,500
100
302 00 0072 / 5760
5830 S GREEN ST
1.0
0 02/25/00
03/08/00
9,500
100
302 00 0071 / 5759
5830 S HALSTED ST
0 02/12/99
02/16/99
6,206
100
805 06 2442 / 8628
4905 S HONORE ST
4.0
10/13/95
10/13/95
0 10/13/95
10/13/95
3,000
100
805 06 2117 / 8303
4905 S HOYNE AVE
6.0
05/25/93
05/25/93
0 05/25/93
05/25/93
4,500
100
805 06 2899 / 9085
5801 S LAFLIN ST
6.0
01/02/92
01/02/92
0 01/02/92
01/02/92
4,500
100
805 06 2897 / 9083
5801 S LOOMIS BLVD
10.0
01/02/92
01/02/92
0 01/02/92
01/02/92
7,500
100
302 00 0072 / 5760
5800 S LOOMIS ST
1.0
0 03/15/00
04/28/00
8,600
100
302 00 0072 / 5760
5800 S MAY ST
1.0
0 03/27/00
03/29/00
8,600
100
805 06 2891 / 9077
5801 S MAY ST
6.0
03/01/92
03/01/92
0 03/01/92
03/01/92
4,500
100
805 06 2279 / 8465
6352 S MAY ST
4.0
12/31/93
12/31/93
0 12/31/93
12/31/93
3,000
100
302 00 0072 / 5760
5830 S MORGAN ST
1.0
0 04/25/00
04/27/00
7,663
100
805 06 2843 / 9029
5899 S OAKLEY AVE
30.0
12/23/93
12/23/93
0 12/23/93
12/23/93
22,500
100
805 06 2796 / 8982
4905 S PAULINA ST
4.0
05/14/93
05/14/93
0 05/14/93
05/14/93
3,000
100
302 00 0072 / 5760
5830 S PEORIA ST
1.0
0 04/27/00
05/05/00
10,150
100
805 06 2900 / 9086
5801 S RACINE AVE
6.0
0 03/01/92
03/01/92
4,500
100
302 00 0072 / 5760
5830 S RACINE AVE
1.0
0 04/17/00
04/27/00
10,553
100
302 00 0072 / 5760
5800 S SANGAMON ST
1.0
0 03/17/00
03/24/00
8,446
100
805 06 2893 / 9079
5801 S THROOP ST
6.0
0 01/02/92
01/02/92
4,500
100
302 00 0072 / 5760
5830 S THROOP ST
1.0
0 04/19/00
04/26/00
10,553
100
805 06 2273 / 8459
4910 S WESTERN BLVD
5.0
0 01/01/91
01/01/91
3,750
100
01/02/92
03/01/92
01/02/92
01/01/91
01/02/92
03/01/92
01/02/92
01/01/91
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 180
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2384 / 8570
4905 S WOLCOTT AVE
4.0
11/18/95
11/18/95
0 11/18/95
11/18/95
3,000
100
805 06 2542 / 8728
4905 S WOOD ST
8.0
03/22/95
03/22/95
0 03/22/95
03/22/95
6,000
100
805 06 2459 / 8645
2399 W 49TH ST
22.0
12/01/91
12/01/91
0 12/01/91
12/01/91
16,500
100
805 06 2587 / 8773
2295 W 51ST ST
22.0
03/16/93
03/16/93
0 03/16/93
03/16/93
16,500
100
805 06 2155 / 8341
1600 W 53RD ST
37.0
11/01/97
11/01/97
0 11/01/97
11/01/97
27,750
100
805 06 2428 / 8614
2295 W 56TH ST
10.0
05/14/93
05/14/93
0 05/14/93
05/14/93
7,500
100
805 06 2452 / 8638
2295 W 56TH ST
22.0
05/14/93
05/14/93
0 05/14/93
05/14/93
16,500
100
300 06 0217 / 5337
1249 W 63RD ST
274.0
03/23/04
03/29/04
15,401 11/14/03
11/21/03
15,797
100
805 06 2099 / 8285
2098 W GARFIELD BLVD
12.0
04/06/93
04/06/93
0 04/06/93
04/06/93
9,000
100
805 06 2104 / 8290
2298 W GARFIELD BLVD
6.0
04/06/93
04/06/93
0 04/06/93
04/06/93
4,500
100
805 06 2109 / 8295
2298 W GARFIELD BLVD
3.0
04/06/93
04/06/93
0 04/06/93
04/06/93
2,250
100
805 06 2105 / 8291
2299 W GARFIELD BLVD
6.0
04/06/93
04/06/93
0 04/06/93
04/06/93
4,500
100
805 06 2107 / 8293
2299 W GARFIELD BLVD
3.0
04/06/93
04/06/93
0 04/06/93
04/06/93
2,250
100
Totals per Underpass Lighting
585.0
15,401
349,668
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 181
1/1/2008 AND 12/31/2008
Ward 16 Joann Thompson CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S CALIFORNIA AVE AND W 57TH ST
1.0
0 11/07/02
11/07/02
7,324
100
210 06 0219 / 4459
S WESTERN AVE AND W 51ST ST
.50
05/12/05
05/13/05
5,282 04/19/05
04/19/05
4,170
100
210 06 0219 / 4459
S WESTERN AVE AND W 54TH ST
.50
05/13/05
05/14/05
5,282 04/18/05
04/18/05
3,879
100
210 06 0219 / 4459
S WESTERN AVE AND W 59TH ST
1.0
05/17/05
05/18/05
10,563 04/14/05
04/14/05
9,046
100
210 06 0219 / 4459
S WESTERN AVE AND W 61ST ST
.50
05/18/05
05/19/05
5,282 04/13/05
04/13/05
4,035
100
210 06 0219 / 4459
W 55TH ST AND S WESTERN AVE
.50
05/16/05
05/17/05
5,282 04/15/05
04/15/05
4,523
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0073 / 4337
5900 S WESTERN AVE
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W 61ST ST AND S KEDZIE AVE
Work Type: Signals 300 06 0096 / 5258
1249 W 63RD ST
Work Type: TSM Install
4.0
31,689
32,977
Locations 1.0
05/01/02
06/01/02
50,000 07/02/02
08/01/02
61,544
100
03/15/06
05/08/07
6,000 02/22/07
03/20/07
2,491
100
09/16/03
09/21/03
0 08/20/03
09/05/03
6,483
100
Locations .0
Intersections 41.0
Locations
814 06 0227 / 16439
5000 S ASHLAND AVE
1.0
09/10/90
09/10/90
0 09/10/90
09/10/90
90,100
100
814 06 0292 / 16504
5300 S ASHLAND AVE
1.0
08/30/90
08/30/90
0 08/30/90
08/30/90
90,100
100
814 06 0338 / 16537
2000 W GARFIELD BLVD
1.0
01/01/96
01/01/96
0 01/01/96
03/11/98
175,000
100
3.0
0
355,200
87,689
458,695
Totals per Construction Phase
2,280,605
1,725,335
Totals for Ward 16
2,280,855
1,728,477
Totals per TSM Install Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 182
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON S BISHOP ST FROM W 65TH ST TO W 69TH ST
.0
04/01/08
08/30/08
0
0
0
300 06 0308 / 5414
ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,065
100
300 06 0308 / 5414
ON S MORGAN ST FROM W 79TH ST TO W 80TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,065
100
300 06 / 32021
7600-7900 S THROOP ST
.0
09/12/06
09/18/06
0 09/12/06
09/18/06
0
0
300 06 0292 / 5399
1610 W 71ST ST
.0
01/20/05
12/21/05
0 01/20/05
12/21/05
0
0
Totals per Design/Engineering
.0
0
2,130
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 183
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 11 / 32206
ON S EMERALD AVE FROM W 73RD ST TO W 74TH ST
5.0
10/21/07
10/21/07
2,200 10/21/07
10/21/07
2,200
100
300 06 0069 / 5233
7000 S ELIZABETH ST
4.0
09/29/02
09/29/02
840 09/26/02
09/26/02
812
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
9.0
3,040
3,012
Fixtures
300 06 0069 / 5233
7600 S RACINE AVE
11.0
01/12/03
01/12/03
4,400 01/09/03
01/09/03
4,125
100
300 06 0069 / 5233
1200 W 76TH ST
11.0
01/12/03
01/12/03
4,400 01/09/03
01/09/03
4,125
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
22.0
8,800
8,250
1,280,025
1,591,305
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 184
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0783 / 6969
6822 S ADA ST
1.0
02/07/96
02/07/96
0 02/07/96
02/07/96
300
100
805 06 1735 / 7921
6937 S ADA ST
1.0
06/10/97
06/10/97
0 06/10/97
06/10/97
300
100
805 06 0784 / 6970
7704 S ADA ST
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 1468 / 7654
7724 S ADA ST
2.0
12/03/97
12/03/97
0 12/03/97
12/03/97
600
100
805 06 1480 / 7666
7745 S ADA ST
1.0
11/28/97
11/28/97
0 11/28/97
11/28/97
300
100
805 06 0830 / 7016
6816 S CARPENTER ST
1.0
11/29/95
11/29/95
0 11/29/95
11/29/95
300
100
805 06 1460 / 7646
6840 S CLAREMONT AVE
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 2001 / 8187
7900 S LAFAYETTE AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 2003 / 8189
7702 S LAFLIN ST
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 1873 / 8059
6822 S LOOMIS BLVD
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 1852 / 8038
7200 S LOWE AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 1864 / 8050
7351 S MARSHFIELD AVE
1.0
06/15/95
06/15/95
0 06/15/95
06/15/95
300
100
805 06 1867 / 8053
7532 S MARSHFIELD AVE
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 1807 / 7993
7512 S MAY ST
1.0
07/30/96
07/30/96
0 07/30/96
07/30/96
300
100
805 06 1808 / 7994
7530 S MAY ST
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
805 06 1809 / 7995
7937 S MAY ST
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 1659 / 7845
6627 S MORGAN ST
1.0
08/01/97
08/01/97
0 08/01/97
08/01/97
300
100
805 06 1943 / 8129
7502 S MORGAN ST
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 1795 / 7981
7928 S MORGAN ST
1.0
04/08/97
04/08/97
0 04/08/97
04/08/97
300
100
805 06 1909 / 8095
7919 S NORMAL AVE
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 0582 / 6768
7500 S PARNELL AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 0628 / 6814
7941 S PARNELL AVE
1.0
04/27/95
04/27/95
0 04/27/95
04/27/95
300
100
805 06 0553 / 6739
7634 S PEORIA ST
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 0549 / 6735
7340 S PRINCETON AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 0583 / 6769
7430 S PRINCETON AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
300 06 0139 / 5289
7811 S RACINE AVE
1,775.0
03/01/06
09/01/06
41,106 06/27/06
07/14/06
53,630
100
302 00 0092 / 5774
7811 S RACINE AVE
39.0
0 01/03/01
12/31/01
9,190
100
805 06 0683 / 6869
7817 S RACINE AVE
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 0427 / 6613
7733 S THROOP ST
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 0347 / 6533
7652 S UNION AVE
1.0
10/29/96
10/29/96
0 10/29/96
10/29/96
300
100
805 06 1203 / 7389
7320 S VINCENNES AVE
1.0
12/19/97
12/19/97
0 12/19/97
12/19/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 185
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0540 / 6726
8018 S WENTWORTH AVE
302 00 0083 / 5768
6705 S WESTERN AVE
805 06 1259 / 7445
6705 S WESTERN AVE
1.0
12/05/97
805 06 1524 / 7710
7941 S YALE AVE
1.0
11/04/97
302 00 0083 / 5768
1632 W 69TH ST
805 06 1455 / 7641
1632 W 69TH ST
302 00 0083 / 5768
1734 W 69TH ST
805 06 1428 / 7614
1734 W 69TH ST
302 00 0083 / 5768
1830 W 69TH ST
805 06 1430 / 7616
1830 W 69TH ST
302 00 0083 / 5768
1934 W 69TH ST
805 06 1432 / 7618
1934 W 69TH ST
302 00 0083 / 5768
2135 W 69TH ST
805 06 1414 / 7600
2135 W 69TH ST
302 00 0083 / 5768
2226 W 69TH ST
805 06 1415 / 7601
2226 W 69TH ST
302 00 0083 / 5768
2336 W 69TH ST
805 06 1419 / 7605
2336 W 69TH ST
302 00 0083 / 5768
2337 W 69TH ST
805 06 1421 / 7607
2337 W 69TH ST
302 00 0083 / 5768
2057 W 71ST ST
805 06 1412 / 7598
2057 W 71ST ST
1.0
12/05/97
805 06 1012 / 7198
1214 W 72ND ST
1.0
805 06 0981 / 7167
1252 W 72ND ST
805 06 1014 / 7200
1.0
0 09/13/96
09/13/96
300
100
0 12/12/97
12/12/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
11/04/97
0 11/04/97
11/04/97
300
100
0 09/09/97
09/09/97
266
100
0 12/05/97
12/05/97
300
100
0 09/09/97
09/09/97
266
100
0 12/05/97
12/05/97
300
100
0 09/09/97
09/09/97
266
100
0 12/05/97
12/05/97
300
100
0 09/09/97
09/09/97
266
100
0 12/05/97
12/05/97
300
100
0 11/07/97
11/07/97
267
100
0 12/05/97
12/05/97
300
100
0 11/07/97
11/07/97
267
100
0 12/05/97
12/05/97
300
100
0 11/07/97
11/07/97
267
100
0 12/05/97
12/05/97
300
100
0 11/07/97
11/07/97
267
100
0 12/05/97
12/05/97
300
100
0 12/12/97
12/12/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
1.0
08/29/95
08/29/95
0 08/29/95
08/29/95
300
100
1435 W 72ND ST
1.0
01/03/97
01/03/97
0 01/03/97
01/03/97
300
100
805 06 1015 / 7201
1460 W 72ND ST
1.0
01/03/97
01/03/97
0 01/03/97
01/03/97
300
100
805 06 1018 / 7204
1200 W 74TH PL
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 1020 / 7206
304 W 75TH ST
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 0998 / 7184
1515 W 77TH ST
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
805 06 0999 / 7185
1364 W 79TH ST
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1001 / 7187
450 W 80TH ST
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
09/13/96
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
09/13/96
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 186
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1047 / 7233
514 W 80TH ST
302 00 0083 / 5768
2431 W LITHUANIAN PLAZA CT
805 06 1424 / 7610
2431 W LITHUANIAN PLAZA CT
1.0
12/05/97
805 06 1879 / 8065
958 W MARQUETTE RD
1.0
10/29/96
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
7811 S RACINE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
7811 S RACINE AVE
Work Type: Flood Light Install 300 06 0167 / 5306
S ARTESIAN AVE AND W 70TH ST
Work Type: Lighting Imprvmnts 281 00 / 32154
7600-7900 S THROOP ST
Work Type: Lighting Imprvmnts
1.0
04/27/95
04/27/95
0 04/27/95
04/27/95
300
100
0 11/07/97
11/07/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
10/29/96
0 10/29/96
10/29/96
300
100
1,868.0
41,106
81,953
Lamps 3,029.0
06/01/07
12/31/07
89,173 12/05/07
12/12/07
86,477
100
0 08/07/02
08/26/02
53,423
100
0 01/06/99
01/06/99
176
100
0 12/08/06
12/31/06
0
0
Installations 2,934.0
Fixtures .50
Blocks .0
12/08/06
12/31/06
Installations
300 06 0256 / 5366
ON W 75TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE
6.0
02/15/04
08/01/04
9,400 07/06/04
05/16/05
12,237
100
300 06 0292 / 5399
1610 W 71ST ST
4.0
03/17/06
05/05/06
52,000 03/17/06
05/05/06
33,180
100
Project,100% Note Last Updated on 01-SEP-06 Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
10.0
61,400
45,417
Fixtures
281 00 / 33664
6832-7100 S DAMEN AVE
32.0
08/25/08
09/26/08
0
0
0
281 00 / 33664
1400-2000 W 71ST ST
46.0
08/25/08
09/26/08
0
0
0
0
0
0
0
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
7811 S RACINE AVE
78.0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 187
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting 300 06 / 32277
ON S BISHOP ST FROM W 65TH ST TO W 69TH ST
300 06 0308 / 5414
ON S CARPENTER ST FROM W 79TH ST TO W 80TH ST
300 07 0017 / 5440 300 07 0017 / 5440 300 06 0298 / 5405
Blocks .0
05/04/08
12/31/08
1.0
08/26/06
10/06/06
ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST
.0
03/01/06
12/31/06
ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST
.0
03/01/06
12/31/06
ON S MORGAN ST FROM W 69TH ST TO W 71ST ST
2.0
06/20/05
07/20/05
0 09/26/05
300 06 0308 / 5414
ON S MORGAN ST FROM W 79TH ST TO W 80TH ST
1.0
07/25/06
09/15/06
95,280 08/02/06
300 07 0017 / 5440
ON S PAULINA ST FROM W 77TH ST TO W 79TH ST
2.0
04/18/06
11/18/06
170,000 10/17/06
300 07 0017 / 5440
ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST
.0
03/01/06
12/31/06
300 07 0017 / 5440
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
300 07 0017 / 5440
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
300 07 0017 / 5440
ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE
.0
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0
0
79,748
100
0
0
0
0
0
0
12/20/05
104,200
100
10/06/06
79,748
100
0
60
0
0
0
12/31/06
0
0
0
03/01/06
12/31/06
0
0
0
03/01/06
12/31/06
0
0
0
360,530
263,696
6.0
0 95,250 08/02/06
10/06/06
Blocks
300 06 0232 / 5346
ON S MAY ST FROM W 69TH ST TO W 70TH ST
2.0
12/28/02
02/28/03
205,000 01/06/03
02/24/03
171,034
100
300 06 0235 / 5349
ON S MORGAN ST FROM W 75TH ST TO W 77TH ST
2.0
08/20/03
09/20/03
143,499 08/18/03
10/31/03
135,346
100
300 06 0267 / 5375
ON S MORGAN ST FROM W 77TH ST TO W 79TH ST
2.0
06/10/04
08/10/04
158,277 06/18/04
09/30/04
140,281
100
300 06 0069 / 5233
ON S PEORIA ST FROM W 64TH ST TO W 66TH ST
1.0
12/15/04
02/28/05
60,000 11/01/04
03/29/05
45,201
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 06 / 32021
7600-7900 S THROOP ST
Work Type: Short Arm Installs - Residntl
7.0
566,776
491,862
Installations .0
09/18/06
09/29/06
0 09/18/06
09/29/06
0
0
Locations
302 00 0092 / 5774
7739 S EMERALD AVE
1.0
0 03/13/01
03/13/01
378
100
302 00 0092 / 5774
7740 S EMERALD AVE
1.0
0 03/13/01
03/13/01
378
100
302 00 0092 / 5774
7746 S EMERALD AVE
1.0
0 03/13/01
03/13/01
378
100
302 00 0092 / 5774
748 W 78TH ST
1.0
0 06/12/01
06/12/01
378
100
4.0
0
Totals per Short Arm Installs - Residntl
1,512
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 188
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 07 0017 / 5440
ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST
32.0
04/18/06
11/18/06
8,000
300 11 / 32206
ON S DAMEN AVE FROM W 69TH PL TO W 71ST ST
32.0
05/01/07
05/15/07
8,000 05/01/07
300 07 0017 / 5440
ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST
.0
03/01/06
12/31/06
300 07 0017 / 5440
ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST
.0
03/01/06
12/31/06
300 04 0216 / 5114
ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST
14.0
05/01/06
11/01/06
300 07 0017 / 5440
ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST
.0
03/01/06
12/31/06
300 07 0017 / 5440
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
12/31/06
300 07 0017 / 5440
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
03/01/06
300 07 0017 / 5440
ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE
56.0
300 11 / 32206
ON W 69TH ST FROM S ASHLAND AVE TO S CLAREMONT AVE
302 00 0075 / 5763 302 00 0076 / 5764
0
0
8,000
100
0
0
0
0
0
0
3,028
100
0
0
0
0
0
0
12/31/06
0
0
0
04/18/06
11/18/06
14,000
0
0
56.0
05/01/07
05/15/07
14,000 05/01/07
05/15/07
14,000
100
ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE
55.0
04/01/97
10/01/97
4,620 04/01/98
08/01/99
4,620
100
ON W 69TH ST FROM S ASHLAND AVE TO S DAMEN AVE
78.0
02/19/98
02/24/98
0 02/19/98
02/24/98
1,326
100
302 00 0076 / 5764
ON W 69TH ST FROM S HALSTED ST TO S ASHLAND AVE
38.54
06/27/98
06/30/98
0 06/27/98
06/30/98
655
100
300 07 0017 / 5440
ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE
46.0
04/18/06
11/18/06
11,500 04/13/07
05/15/07
0
100
300 11 / 32206
ON W 71ST ST FROM S LOOMIS BLVD TO S DAMEN AVE
46.0
05/01/07
05/15/07
11,500 05/01/07
05/15/07
11,500
100
300 07 0017 / 5440
ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE
.0
03/01/06
12/31/06
0
0
0
74,648
43,129
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 300 06 0117 / 5271
7600-7699 S YALE AVE
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
7811 S RACINE AVE
453.54
3,028 05/17/06
05/15/07
07/01/06
Blocks 1.0
40,000 12/20/99
01/05/00
17,194
100
8,471 07/31/06
08/23/06
17,740
100
Lamps 1,629.0
03/01/04
12/01/04
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 189
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2308 / 8494
7401 S ASHLAND AVE
22.0
05/20/96
05/20/96
0 05/20/96
05/20/96
16,500
100
805 06 2333 / 8519
7405 S DAMEN AVE
16.0
03/16/93
03/16/93
0 03/16/93
03/16/93
12,000
100
302 00 0072 / 5760
7500 S EMERALD AVE
1.0
0 04/21/00
04/24/00
2,800
100
302 00 0072 / 5760
7500 S HALSTED ST
1.0
0 04/19/00
05/08/00
13,000
100
805 06 2251 / 8437
7401 S LOOMIS BLVD
10.0
01/05/93
01/05/93
0 01/05/93
01/05/93
7,500
100
805 06 2606 / 8792
7401 S LOWE AVE
22.0
09/10/91
09/10/91
0 09/10/91
09/10/91
16,500
100
805 06 2555 / 8741
7495 S MORGAN ST
18.0
02/02/93
02/02/93
0 02/02/93
02/02/93
13,500
100
805 06 2554 / 8740
7505 S PEORIA ST
32.0
01/28/93
01/28/93
0 01/28/93
01/28/93
24,000
100
805 06 2250 / 8436
7501 S RACINE AVE
24.0
10/24/96
10/24/96
0 10/24/96
10/24/96
18,000
100
300 06 0217 / 5337
7811 S RACINE AVE
464.0
03/05/04
03/11/04
26,081 11/24/03
12/01/03
19,989
100
805 06 2552 / 8738
7405 S UNION AVE
18.0
07/22/93
07/22/93
0 07/22/93
07/22/93
13,500
100
805 06 2553 / 8739
7405 S UNION AVE
10.0
07/22/93
07/22/93
0 07/22/93
07/22/93
7,500
100
302 00 0071 / 5759
2150 W 68TH ST
0 10/10/98
10/20/98
24,830
100
805 06 2245 / 8431
2219 W 68TH ST
21.0
01/27/92
01/27/92
0 01/27/92
01/27/92
15,750
100
805 06 2386 / 8572
2219 W 69TH ST
78.0
02/14/96
02/14/96
0 02/14/96
02/14/96
58,500
100
805 06 2605 / 8791
599 W 72ND ST
22.0
05/31/95
05/31/95
0 05/31/95
05/31/95
16,500
100
805 06 2600 / 8786
435 W 74TH ST
14.0
01/01/91
01/01/91
0 01/01/91
01/01/91
10,500
100
805 06 2624 / 8810
501 W 75TH ST
16.0
02/02/94
02/02/94
0 02/02/94
02/02/94
12,000
100
302 00 0072 / 5760
500 W 76TH ST
1.0
0 01/18/00
02/04/00
11,350
100
805 06 2623 / 8809
501 W 76TH ST
14.0
0 09/27/91
09/27/91
10,500
100
302 00 0072 / 5760
600 W 76TH ST
1.0
0 02/02/00
02/21/00
19,995
100
805 06 2603 / 8789
631 W 76TH ST
26.0
12/01/91
12/01/91
0 12/01/91
12/01/91
19,500
100
805 06 2601 / 8787
555 W 78TH ST
32.0
01/12/94
01/12/94
0 01/12/94
01/12/94
24,000
100
805 06 2599 / 8785
551 W 79TH ST
22.0
10/19/93
10/19/93
0 10/19/93
10/19/93
16,500
100
805 06 2095 / 8281
536 W 80TH ST
15.0
02/21/94
02/21/94
0 02/21/94
02/21/94
11,250
100
805 06 2096 / 8282
536 W 80TH ST
25.0
02/25/94
02/25/94
0 02/25/94
02/25/94
18,750
100
805 06 2321 / 8507
426 W 81ST ST
10.0
05/13/96
05/13/96
0 05/13/96
05/13/96
7,500
100
805 06 2346 / 8532
426 W 81ST ST
17.0
05/13/96
05/13/96
0 05/13/96
05/13/96
12,750
100
805 06 2244 / 8430
2223 W MARQUETTE RD
30.0
10/02/96
10/02/96
0 10/02/96
10/02/96
22,500
100
Totals per Underpass Lighting
982.0
09/27/91
09/27/91
26,081
477,464
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 190
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S ASHLAND AVE AND W 71ST ST
1.0
05/05/05
05/05/05
10,653 05/16/05
05/20/05
10,084
210 06 0219 / 4459
S ASHLAND AVE AND W MARQUETTE RD
.50
05/06/05
05/06/05
5,327 07/01/05
07/05/05
0
210 06 0219 / 4459
S WESTERN AVE AND W 69TH ST
1.0
05/24/05
05/25/05
10,563 04/08/05
04/08/05
8,007
100
210 06 0219 / 4459
S WESTERN AVE AND W 71ST ST
.50
05/25/05
05/26/05
5,282 04/07/05
04/07/05
5,403
100
210 06 0219 / 4459
S WESTERN AVE AND W MARQUETTE RD
.50
05/23/05
05/24/05
5,282 03/25/05
03/25/05
4,004
100
Totals per LED Signal Head Install
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
S VINCENNES AVE AND W 79TH ST
Work Type: Signals 300 06 0096 / 5258
7811 S RACINE AVE
Work Type: TSM Install
3.50
37,106
100
27,498
Crossings 1.0
4,000 05/02/01
05/08/01
5,636
100
Intersections 33.0
08/08/03
08/12/03
0 08/07/03
08/13/03
5,218
100
Locations
814 06 0388 / 16576
7600 S HALSTED ST
1.0
12/15/95
12/15/95
0 12/15/95
12/15/95
137,995
100
210 06 0065 / 4330
7800 S HALSTED ST
1.0
02/15/99
04/30/99
0 02/15/99
04/15/99
126,808
100
271 00 0045 / 4794
7100 S WESTERN AVE
1.0
0 08/01/97
08/15/99
201,000
3.0
0
465,803
Totals per TSM Install
Work Type: Traffic Equipment Painting
Locations
300 07 0017 / 5440
ON S LAFLIN ST FROM W 71ST ST TO W 72ND ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON S LAFLIN ST FROM W 72ND ST TO W 73RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON S WINCHESTER AVE FROM W 73RD ST TO W 74TH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON W 68TH ST FROM S PAULINA ST TO S HERMITAGE AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON W 68TH ST FROM S WOOD ST TO S HONORE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE
2.0
04/18/06
11/18/06
5,800
0
0
300 11 / 32206
ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE
2.0
05/01/07
05/15/07
5,800 05/01/07
5,800
100
300 07 0017 / 5440
ON W 79TH ST FROM S EGGLESTON AVE TO S NORMAL AVE
.0
03/01/06
12/31/06
0
0
0
11,600
5,800
52,706
509,955
1,332,731
2,101,259
Totals per Traffic Equipment Painting Totals per Traffic Totals per Construction Phase
4.0
05/15/07
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 191
1/1/2008 AND 12/31/2008
Ward 17 Latasha R. Thomas CIP/CPM Number Totals for Ward 17
Street Address
No of Units
Start
WIP Estimate End
Cost 1,332,731
Start
WIP Actual (to Date) End
Cost 2,103,389
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 192
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0274 / 5382
ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
3,796
100
300 06 0274 / 5382
ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST
.0
07/01/04
12/31/04
0 03/22/05
05/06/05
3,796
100
300 06 0274 / 5382
ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST
.0
07/01/04
12/31/04
0 03/22/05
05/06/05
3,796
100
300 06 0274 / 5382
ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
3,796
100
300 06 0274 / 5382
ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
3,796
100
300 06 0274 / 5382
ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST
.0
07/01/04
12/31/04
0 07/01/04
12/31/04
3,796
100
300 06 0274 / 5382
ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE
.0
07/01/04
12/31/04
0 03/22/05
05/06/05
3,796
100
300 06 / 32146
ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE
.0
05/01/07
10/31/07
1,950 06/21/07
07/19/07
1,000
100
300 06 0292 / 5399
1630 W 87TH ST
1.0
05/27/05
06/14/05
2,000 05/27/05
06/14/05
1,667
100
300 06 0292 / 5399
3811 W COLUMBUS AVE
1.0
1,000 05/23/05
06/23/05
0
100
2.0
4,950
Totals per Design/Engineering
29,239
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 193
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0018 / 5441
ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST
8.0
04/18/06
11/18/06
1,200
300 05 0018 / 5133
ON S HAMILTON AVE FROM W 83RD ST TO W 84TH ST
4.0
04/04/05
11/18/05
1,700 07/09/05
300 07 0018 / 5441
ON S HERMITAGE AVE FROM W 86TH ST TO W 87TH ST
5.0
01/19/07
01/31/07
300 07 0018 / 5441
ON S HONORE ST FROM W 79TH ST TO W 82ND ST
4.10
04/18/06
11/18/06
300 06 0069 / 5233
ON S HOYNE AVE FROM W 79TH PL TO W 80TH PL
7.0
11/16/02
11/16/02
1,470 11/13/02
300 05 0018 / 5133
ON S MAPLEWOOD AVE FROM W 71ST ST TO W 72ND ST
5.0
04/04/05
11/18/05
2,100 07/09/05
300 07 0018 / 5441
ON S MAPLEWOOD AVE FROM W 74TH ST TO W COLUMBUS AVE
3.0
04/18/06
11/18/06
1,200
300 06 0069 / 5233
ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST
4.0
300 03 0018 / 4889
ON S PAULINA ST FROM W 82ND ST TO W 83RD ST
4.0
10/01/04
300 07 0018 / 5441
ON S SACRAMENTO AVE FROM W 73RD ST TO W 74TH ST
4.0
01/19/07
300 07 0018 / 5441
ON S ST LOUIS AVE FROM W 84TH ST TO W 85TH ST
3.0
300 05 0018 / 5133
ON S TRUMBULL AVE FROM W 79TH ST TO W 80TH ST
300 03 0018 / 4889 300 07 0018 / 5441
0
0
1,036
100
2,000
0
0
5,200
0
0
11/13/02
1,421
100
07/15/05
1,295
100
07/15/05
0
0
1,500 05/06/02
05/06/02
1,500
100
10/01/04
1,700 10/20/04
10/20/04
1,547
100
01/31/07
1,600
0
0
01/19/07
01/31/07
1,200
0
0
4.0
04/04/05
11/18/05
1,700 07/09/05
1,036
100
ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE
5.0
12/01/04
12/31/04
2,075
0
ON W 78TH PL FROM S ST LOUIS AVE TO S CENTRAL PARK AVE
4.0
04/18/06
11/18/06
1,600
0
300 07 0018 / 5441
ON W 78TH ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE
4.0
04/18/06
11/18/06
1,600
0
0
300 06 0069 / 5233
ON W 80TH PL FROM S HOYNE AVE TO S DAMEN AVE
4.0
11/16/02
11/16/02
840 11/13/02
11/13/02
812
100
300 05 0018 / 5133
ON W 80TH PL FROM S OAKLEY AVE TO S WESTERN AVE
3.0
04/04/05
11/18/05
1,300 07/09/05
07/15/05
777
100
300 07 0018 / 5441
ON W 83RD PL FROM S SPAULDING AVE TO S HOMAN AVE
4.0
01/19/07
01/31/07
1,600 01/19/07
01/31/07
1,600
100
300 07 0018 / 5441
ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE
5.0
01/19/07
01/31/07
2,000 01/19/07
01/31/07
2,000
100
300 07 0018 / 5441
W 80TH ST AND S WESTERN AVE
8.0
04/18/06
11/18/06
3,200
0
0
300 07 0018 / 5441
W 84TH PL AND S ST LOUIS AVE
3.0
01/19/07
01/31/07
1,200
0
0
302 00 0092 / 5774
7103-7155 S ARTESIAN AVE
5.0
0 12/19/01
12/19/01
1,029
100
302 00 0092 / 5774
7221-7225 S ARTESIAN AVE
5.0
0 07/14/01
07/14/01
1,029
100
302 00 0092 / 5774
7101 S FAIRFIELD AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
7113 S FAIRFIELD AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
7129 S FAIRFIELD AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
7135 S FAIRFIELD AVE
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
7149 S FAIRFIELD AVE
1.0
0 11/12/01
11/12/01
206
100
300 06 0069 / 5233
8300 S FRANCISCO AVE
300 06 0069 / 5233 300 06 0069 / 5233
07/15/05
0
21.0
11/04/02
11/04/02
8,400 11/01/02
11/01/02
4,748
100
7359 S MAPLEWOOD AVE
1.0
11/15/02
11/15/02
210 11/12/02
11/12/02
203
100
7200 S OAKLEY AVE
5.0
03/25/02
03/25/02
1,050 03/22/02
03/22/02
1,015
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 194
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
7100-7199 S ROCKWELL ST
5.0
1,029 09/29/01
09/29/01
1,029
100
302 00 0092 / 5774
2300 W 72ND ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
2136 W 84TH ST
2.0
0 10/17/01
10/17/01
412
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 06 0069 / 5233
ON S PULASKI RD FROM W 55TH ST TO W 83RD ST
300 11 / 32207
ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE
Totals per 400 Watt Changeout Totals per Lighting/Electrical
10/19/01
10/19/01
145.10
48,674
23,725
Fixtures 245.0 44.0 289.0
01/01/08
01/21/08
98,000 08/02/02
08/23/02
49,240
100
17,600 11/30/07
02/19/08
8,500
100
115,600
57,740
2,562,083
2,282,486
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 195
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0083 / 5768
7156 S ARTESIAN AVE
805 06 1233 / 7419
7156 S ARTESIAN AVE
302 00 0083 / 5768
7351 S CALIFORNIA AVE
805 06 1238 / 7424
7351 S CALIFORNIA AVE
302 00 0083 / 5768
7156 S CAMPBELL AVE
805 06 1234 / 7420
7156 S CAMPBELL AVE
302 00 0083 / 5768
7422 S CAMPBELL AVE
805 06 1240 / 7426
7422 S CAMPBELL AVE
1.0
302 00 0092 / 5774
7701 S CHRISTIANA AVE
1.0
302 00 0083 / 5768
7133 S CLAREMONT AVE
805 06 1232 / 7418
7133 S CLAREMONT AVE
302 00 0083 / 5768
7056 S FAIRFIELD AVE
805 06 1231 / 7417
7056 S FAIRFIELD AVE
1.0
12/05/97
805 06 1660 / 7846
8116 S FAIRFIELD AVE
1.0
805 06 1685 / 7871
8224 S FAIRFIELD AVE
805 06 1174 / 7360
8130 S HOMAN AVE
302 00 0083 / 5768
7737 S KEDZIE AVE
805 06 1244 / 7430
7737 S KEDZIE AVE
1.0
12/05/97
300 06 0139 / 5289
8146 S KEDZIE AVE
2,075.0
03/01/06
302 00 0092 / 5774
8146 S KEDZIE AVE
27.0
805 06 1182 / 7368
8362 S KENTON AVE
1.0
03/12/95
805 06 2034 / 8220
8559 S KILDARE AVE
1.0
805 06 1993 / 8179
8521 S KNOX AVE
805 06 0676 / 6862
0 10/30/97
10/30/97
267
100
0 12/05/97
12/05/97
300
100
0 10/30/97
10/30/97
267
100
0 12/05/97
12/05/97
300
100
0 10/30/97
10/30/97
266
100
0 12/05/97
12/05/97
300
100
0 10/30/97
10/30/97
266
100
0 12/05/97
12/05/97
300
100
0 06/29/01
06/29/01
236
100
0 10/30/97
10/30/97
266
100
0 12/05/97
12/05/97
300
100
0 10/15/97
10/15/97
266
100
12/05/97
0 12/05/97
12/05/97
300
100
08/04/97
08/04/97
0 08/04/97
08/04/97
300
100
1.0
06/25/97
06/25/97
0 06/25/97
06/25/97
300
100
1.0
04/04/95
04/04/95
0 04/04/95
04/04/95
300
100
0 10/15/97
10/15/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
09/01/06
47,602 02/01/06
03/16/06
62,694
100
0 01/31/01
01/25/02
6,363
100
03/12/95
0 03/12/95
03/12/95
300
100
09/15/95
09/15/95
0 09/15/95
09/15/95
300
100
1.0
02/01/95
02/01/95
0 02/01/95
02/01/95
300
100
8021 S SACRAMENTO AVE
1.0
10/04/96
10/04/96
0 10/04/96
10/04/96
300
100
805 06 0674 / 6860
8039 S SACRAMENTO AVE
1.0
08/08/96
08/08/96
0 08/08/96
08/08/96
300
100
805 06 0720 / 6906
8102 S SACRAMENTO AVE
1.0
05/23/96
05/23/96
0 05/23/96
05/23/96
300
100
805 06 0407 / 6593
7656 S SPRINGFIELD AVE
1.0
09/23/96
09/23/96
0 09/23/96
09/23/96
300
100
302 00 0083 / 5768
7351 S TALMAN AVE
0 12/09/97
12/09/97
267
100
805 06 1239 / 7425
7351 S TALMAN AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
7714 S TROY ST
0 09/05/97
09/05/97
267
100
805 06 1241 / 7427
7714 S TROY ST
0 12/05/97
12/05/97
300
100
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 196
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0083 / 5768
7719 S TROY ST
805 06 1242 / 7428
7719 S TROY ST
302 00 0083 / 5768
7727 S TROY ST
805 06 1243 / 7429
7727 S TROY ST
1.0
12/05/97
805 06 0374 / 6560
7700 S TRUMBULL AVE
1.0
805 06 0375 / 6561
7818 S TRUMBULL AVE
1.0
302 00 0083 / 5768
7036 S WASHTENAW AVE
805 06 1260 / 7446
7036 S WASHTENAW AVE
1.0
12/05/97
805 06 0508 / 6694
7937 S WASHTENAW AVE
1.0
01/03/95
302 00 0083 / 5768
7209 S WESTERN AVE
805 06 1235 / 7421
7209 S WESTERN AVE
302 00 0083 / 5768
7247 S WESTERN AVE
805 06 1236 / 7422
7247 S WESTERN AVE
1.0
12/05/97
805 06 0522 / 6708
8118 S WESTERN AVE
1.0
805 06 0437 / 6623
7712 S WOLCOTT AVE
805 06 0438 / 6624
7718 S WOLCOTT AVE
302 00 0083 / 5768
2634 W 71ST ST
805 06 1406 / 7592
2634 W 71ST ST
302 00 0083 / 5768
3201 W 71ST ST
805 06 1410 / 7596
3201 W 71ST ST
302 00 0083 / 5768
2305 W 72ND ST
805 06 1417 / 7603
2305 W 72ND ST
302 00 0083 / 5768
2442 W 74TH ST
805 06 1398 / 7584
2442 W 74TH ST
1.0
12/05/97
805 06 0992 / 7178
3401 W 76TH PL
1.0
805 06 0993 / 7179
3457 W 76TH PL
805 06 0994 / 7180
0 09/05/97
09/05/97
267
100
0 12/05/97
12/05/97
300
100
0 09/05/97
09/05/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
05/08/95
05/08/95
0 05/08/95
05/08/95
300
100
0 12/12/97
12/12/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
01/03/95
0 01/03/95
01/03/95
300
100
0 12/12/97
12/12/97
266
100
0 12/05/97
12/05/97
300
100
0 12/12/97
12/12/97
266
100
12/05/97
0 12/05/97
12/05/97
300
100
01/10/96
01/10/96
0 01/10/96
01/10/96
300
100
1.0
09/26/96
09/26/96
0 09/26/96
09/26/96
300
100
1.0
09/26/96
09/26/96
0 09/26/96
09/26/96
300
100
0 12/12/97
12/12/97
267
100
0 12/05/97
12/05/97
300
100
0 12/12/97
12/12/97
267
100
0 12/05/97
12/05/97
300
100
0 12/12/97
12/12/97
267
100
0 12/05/97
12/05/97
300
100
0 12/12/97
12/12/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
02/22/95
02/22/95
0 02/22/95
02/22/95
300
100
1.0
02/22/95
02/22/95
0 02/22/95
02/22/95
300
100
3501 W 76TH PL
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
300
100
805 06 0995 / 7181
3832 W 76TH PL
1.0
12/13/95
12/13/95
0 12/13/95
12/13/95
300
100
805 06 0774 / 6960
2153 W 82ND PL
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
805 06 0773 / 6959
3517 W 82ND PL
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 0775 / 6961
2037 W 82ND ST
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 197
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0776 / 6962
2604 W 83RD ST
1.0
04/23/96
04/23/96
0 04/23/96
04/23/96
300
100
805 06 0777 / 6963
3740 W 83RD ST
1.0
10/17/95
10/17/95
0 10/17/95
10/17/95
300
100
805 06 0763 / 6949
3626 W 85TH PL
1.0
11/23/96
11/23/96
0 11/23/96
11/23/96
300
100
805 06 0772 / 6958
3720 W 85TH ST
1.0
04/23/96
04/23/96
0 04/23/96
04/23/96
300
100
805 06 1646 / 7832
3821 W 86TH PL
1.0
09/08/97
09/08/97
0 09/08/97
09/08/97
300
100
805 06 0753 / 6939
4742 W 87TH ST
1.0
03/20/97
03/20/97
0 03/20/97
03/20/97
300
100
805 06 1556 / 7742
3235 W COLUMBUS AVE
1.0
04/19/95
04/19/95
0 04/19/95
04/19/95
300
100
805 06 1723 / 7909
2706 W SEIPP ST
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1520 / 7706
2720 W SEIPP ST
1.0
10/31/97
10/31/97
0 10/31/97
10/31/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
8146 S KEDZIE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
8146 S KEDZIE AVE
Work Type: Flood Light Install
2,153.0
47,602
89,093
Lamps 1,992.0
06/01/07
12/31/07
58,644 12/14/07
12/21/07
56,871
100
0 08/15/02
08/30/02
33,812
100
Installations 1,857.0
Fixtures
300 06 0167 / 5306
W 83RD ST AND S KOSTNER AVE
6.0
0 07/22/99
07/22/99
1,523
100
300 06 0167 / 5306
W 83RD ST AND S SCOTTSDALE AVE
3.0
0 12/02/99
12/02/99
470
100
300 06 0167 / 5306
W 84TH ST AND S KOLIN AVE
8.0
0 12/02/99
12/02/99
1,316
100
300 06 0167 / 5306
W 86TH ST AND S KEDVALE AVE
2.0
0 09/20/99
09/20/99
702
100
302 00 0092 / 5774
8300 S HAMILTON AVE
1.0
0 10/17/01
10/17/01
404
100
302 00 0092 / 5774
8338 S HAMILTON AVE
1.0
0 10/17/01
10/17/01
345
100
302 00 0092 / 5774
8358 S HAMILTON AVE
1.0
0 10/17/01
10/17/01
345
100
300 06 0071 / 5234
6734 S KEDZIE AVE
0 11/22/00
11/30/00
17,100
100
302 00 0092 / 5774
8401 S KOMENSKY AVE
1.0
0 04/05/01
04/05/01
471
100
302 00 0092 / 5774
7820 S OAKLEY AVE
1.0
0 04/05/01
04/05/01
471
100
302 00 0092 / 5774
2135 W 84TH ST
1.0
0 01/17/01
01/17/01
404
100
Totals per Flood Light Install
11/23/00
25.0
11/25/00
0
23,551
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 198
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Lighting Imprvmnts 300 06 0150 / 5291
ON S KEDZIE AVE FROM W 76TH ST TO W 71ST ST
Work Type: Lighting Imprvmnts
3.0
07/01/03
10/01/04
385,000 05/29/03
306,152
70
Installations
300 06 0302 / 5408
3330 W 71ST ST
1.0
06/01/05
09/30/05
25,337 07/01/05
08/02/05
10,208
100
300 06 0292 / 5399
1630 W 87TH ST
.0
03/01/05
12/31/05
9,407 07/09/05
08/16/05
9,149
100
300 06 0292 / 5399
3811 W COLUMBUS AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting 300 11 / 32207
ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE
300 06 0122 / 5275
ON W COLUMBUS AVE FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
8146 S KEDZIE AVE
Work Type: Residntl Staggered Lighting
1.0
34,744
19,357
Fixtures 44.0
01/01/08
01/21/08
59,400 11/30/07
02/19/08
38,025
100
8.0
11/01/03
11/07/03
9,600 10/30/03
10/30/03
10,787
100
52.0
69,000
48,812
Lamps .0
03/01/08
12/01/08
0
0
0
0
Blocks
300 07 0017 / 5440
ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST
.0
03/01/06
12/31/06
0
0
300 07 0017 / 5440
ON S MOZART ST FROM W 82ND ST TO W 83RD ST
.0
03/01/06
12/31/06
0
0
0
300 06 / 32146
ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE
2.0
12/05/07
04/29/08
158,512
0
50
300 06 0298 / 5405
ON W 83RD ST FROM S DAMEN AVE TO S LEAVITT ST
2.0
05/01/05
06/15/05
98,623
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
4.0
0 06/06/05
07/29/05
158,512
98,623
Blocks
300 06 0122 / 5275
ON W 83RD ST FROM S KOLIN AVE TO S KOSTNER AVE
1.0
05/01/03
07/01/03
106,250 04/22/03
06/30/03
106,250
100
300 06 0235 / 5349
ON W 83RD ST FROM S KOSTNER AVE TO S CICERO AVE
2.0
05/01/03
08/01/03
75,243 03/14/03
06/06/03
69,065
100
300 06 0267 / 5375
ON W 83RD ST FROM S PULASKI RD TO S HAMLIN AVE
2.0
04/01/04
06/01/04
170,337 04/19/04
07/19/04
160,844
100
300 06 0235 / 5349
ON W 83RD ST FROM S PULASKI RD TO S KOSTNER AVE
2.0
05/01/03
07/01/03
77,102 04/22/03
06/30/03
69,065
100
Totals per Residntl Strt Lighting/Lamps
7.0
428,932
405,224
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 199
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
7200 S MOZART ST
1.0
0 03/07/01
03/07/01
378
100
302 00 0092 / 5774
7300 S MOZART ST
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
2300 W 72ND ST
1.0
0 06/15/01
06/15/01
378
100
3.0
0
Totals per Short Arm Installs - Residntl
1,134
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 200
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 07 0017 / 5440
ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST
.0
03/01/06
12/31/06
0
0
300 03 0018 / 4889
ON S CALIFORNIA AVE FROM W 83RD ST TO W 87TH ST
35.0
05/01/05
05/31/05
7,643
0
300 07 0018 / 5441
ON S CLAREMONT AVE FROM W 74TH ST TO W 75TH ST
3.0
04/18/06
11/18/06
600 12/01/06
12/04/06
0
100
300 05 0018 / 5133
ON S FRANCISCO AVE FROM W SEIPP ST TO W 87TH ST
9.0
07/25/05
08/15/05
1,000 07/25/05
08/15/05
1,154
100
300 05 0018 / 5133
ON S KOLMAR AVE FROM W 85TH ST TO W 86TH ST
5.0
04/04/05
11/18/05
1,000 07/25/05
08/15/05
721
100
300 07 0017 / 5440
ON S MOZART ST FROM W 82ND ST TO W 83RD ST
.0
03/01/06
12/31/06
300 07 0018 / 5441
ON S OAKLEY AVE FROM W 74TH ST TO W 75TH ST
3.0
04/18/06
11/18/06
300 06 0058 / 5229
ON S PULASKI RD FROM W 55TH ST TO W 83RD ST
190.0
300 04 0216 / 5114
ON S PULASKI RD FROM W 83RD ST TO W 85TH ST
35.0
05/01/06
11/01/06
300 07 0018 / 5441
ON S TRIPP AVE FROM W 85TH ST TO W 86TH ST
3.0
04/18/06
11/18/06
300 03 0018 / 4889
ON S WESTERN AVE FROM W 77TH ST TO W 79TH ST
40.0
05/01/05
05/30/05
9,888
300 03 0018 / 4889
ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE
16.0
05/01/05
05/30/05
3,317
300 03 0018 / 4889
ON W 82ND PL FROM S DAMEN AVE TO S HOYNE AVE
9.0
10/01/04
10/15/04
1,800 10/01/04
10/20/04
1,298
100
300 07 0018 / 5441
ON W 83RD PL FROM W COLUMBUS AVE TO S ST LOUIS AVE
5.0
04/18/06
11/18/06
1,250 09/29/06
10/05/06
0
100
300 03 0018 / 4889
ON W 83RD ST FROM S WESTERN AVE TO S KEDZIE AVE
65.0
10/01/04
10/15/04
21,800 10/11/04
10/20/04
1,730
100
300 07 0018 / 5441
ON W 84TH ST FROM S CALIFORNIA AVE TO S FRANCISCO AVE
5.0
04/18/06
11/18/06
1,000 09/29/06
10/05/06
848
100
300 07 0018 / 5441
ON W 85TH ST FROM S WASHTENAW AVE TO S CALIFORNIA AVE
5.0
04/18/06
11/18/06
1,000 09/29/06
10/05/06
848
100
300 05 0018 / 5133
ON W 86TH PL FROM S FRANCISCO AVE TO S SACRAMENTO AVE
5.0
04/04/05
11/18/05
1,000 07/25/05
08/15/05
721
100
300 05 0018 / 5133
ON W 86TH ST FROM S FRANCISCO AVE TO S SACRAMENTO AVE
5.0
04/04/05
11/18/05
1,000 07/25/05
08/15/05
721
100
300 07 0018 / 5441
ON W 86TH ST FROM S TRIPP AVE TO S KILDARE AVE
1.0
04/18/06
11/18/06
250 09/29/06
10/05/06
0
100
300 05 0018 / 5133
ON W 87TH ST FROM S ROCKWELL ST TO S KEDZIE AVE
45.0
04/04/05
11/18/05
11,250 07/25/05
08/15/05
9,878
100
300 07 0018 / 5441
ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST
53.0
04/18/06
11/18/06
13,250 10/05/06
10/16/06
10,479
100
300 07 0018 / 5441
W 80TH ST AND S WESTERN AVE
8.0
04/18/06
11/18/06
1,600 09/29/06
10/05/06
1,356
100
300 07 0018 / 5441
W 82ND PL AND S DAMEN AVE
9.0
04/18/06
11/18/06
1,800 09/29/06
10/05/06
1,526
100
302 00 0077 / 5765
8501-8537 S KOLIN AVE
3.0
0 06/15/99
06/15/99
262
100
300 03 0018 / 4889
2750 W COLUMBUS AVE
8.0
2,000 10/01/04
10/20/04
19,251
100
Totals per Strt Light Pole Painting
565.0
10/01/04
10/15/04
0
0
0
0
600 09/29/06
10/05/06
0
100
52,780 08/12/02
09/25/02
52,780
100
7,498 05/17/06
06/18/06
7,498
100
600 09/29/06
10/05/06
508
100
143,926
0 0
111,579
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 201
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting
Blocks
300 06 0274 / 5382
ON S CENTRAL PARK AVE FROM W 85TH ST TO W 87TH ST
2.0
06/24/05
03/24/06
150,000 06/24/05
03/24/06
80,000
100
300 06 0247 / 5357
ON S FRANCISCO AVE FROM W 83RD ST TO W 85TH ST
2.0
07/01/05
12/31/05
175,000 07/20/05
01/06/06
133,991
100
300 06 0274 / 5382
ON S HOMAN AVE FROM W 76TH PL TO W 77TH ST
.50
06/24/05
03/24/06
40,000 06/24/05
03/24/06
80,000
100
300 06 0274 / 5382
ON S HOYNE AVE FROM W 79TH ST TO W 80TH ST
1.0
06/24/05
12/27/05
75,000 06/24/05
12/27/05
80,000
100
300 06 0247 / 5357
ON S WHIPPLE ST FROM W 83RD ST TO W 85TH ST
2.0
06/01/04
09/01/04
210,000 10/08/04
05/12/05
128,775
100
300 06 0247 / 5357
ON W 74TH ST FROM S BELL AVE TO S WESTERN AVE
2.0
10/01/03
12/01/03
3,100 05/22/03
05/30/03
3,040
100
300 06 0274 / 5382
ON W 77TH ST FROM S HOMAN AVE TO S KEDZIE AVE
1.50
06/24/05
03/24/06
150,000 06/24/05
03/24/06
80,000
100
300 06 0274 / 5382
ON W 78TH ST FROM S HOYNE AVE TO S HAMILTON AVE
.50
06/24/05
08/05/05
40,000 06/24/05
08/05/05
80,000
100
300 06 0274 / 5382
ON W 81ST ST FROM S SACRAMENTO AVE TO S WHIPPLE ST
.50
06/24/05
08/05/05
40,000 06/24/05
08/05/05
80,000
100
300 06 0274 / 5382
ON W 82ND ST FROM S MAPLEWOOD AVE TO S CALIFORNIA AVE
2.50
06/24/05
12/20/05
180,000 06/24/05
12/20/05
80,000
100
14.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
8146 S KEDZIE AVE
Work Type: Underpass Lighting
1,063,100
825,806
Lamps 1,130.0
03/01/04
12/01/04
5,876 07/31/06
08/29/06
12,305
100
Fixtures
805 06 2468 / 8654
2400 E 87TH ST
19.0
02/12/96
02/12/96
0 02/12/96
02/12/96
14,250
100
805 06 2469 / 8655
2400 E 87TH ST
19.0
02/12/96
02/12/96
0 02/12/96
02/12/96
14,250
100
302 00 0070 / 5758
7500 S DAMEN AVE
0 12/15/97
12/23/97
8,366
100
805 06 2138 / 8324
7500 S DAMEN AVE
22.0
12/23/97
12/23/97
0 12/23/97
12/23/97
16,500
100
805 06 2426 / 8612
7901 S KEDZIE AVE
22.0
09/29/95
09/29/95
0 09/29/95
09/29/95
16,500
100
300 06 0217 / 5337
8146 S KEDZIE AVE
44.0
03/02/04
03/04/04
2,473 12/02/03
12/02/03
3,230
100
302 00 0070 / 5758
7500 S WESTERN AVE
0 06/12/97
06/19/97
20,106
100
805 06 2189 / 8375
7500 S WESTERN AVE
34.0
06/19/97
06/19/97
0 06/19/97
06/19/97
25,500
100
805 06 2098 / 8284
8205 S WESTERN AVE
10.0
02/07/94
02/07/94
0 02/07/94
02/07/94
7,500
100
805 06 2385 / 8571
2299 W 79TH ST
16.0
03/12/93
03/12/93
0 03/12/93
03/12/93
12,000
100
302 00 0072 / 5760
3150 W 79TH ST
1.0
0 02/08/00
02/18/00
15,500
100
805 06 2961 / 9147
2135 W 83RD ST
12.0
10/20/93
10/20/93
0 10/20/93
10/20/93
9,000
100
805 06 2957 / 9143
2547 W 83RD ST
8.0
11/01/93
11/01/93
0 11/01/93
11/01/93
6,000
100
Totals per Underpass Lighting
207.0
2,473
168,702
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 202
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
ON S WESTERN AVE FROM W 74TH ST TO W COLUMBUS AVE
2.0
05/26/05
05/27/05
10,563 03/16/05
03/16/05
9,422
100
210 06 0219 / 4459
S ASHLAND AVE AND W 83RD ST
.50
05/04/05
05/04/05
5,327 05/06/05
05/06/05
0
100
210 06 0219 / 4459
S WESTERN AVE AND W 71ST ST
.50
05/25/05
05/26/05
5,282 04/07/05
04/07/05
5,403
100
210 06 0219 / 4459
S WESTERN AVE AND W 77TH ST
1.0
05/27/05
05/28/05
10,563 04/06/05
04/06/05
8,008
100
210 06 0130 / 4389
S WESTERN AVE AND W 79TH ST
1.0
0 07/31/02
07/31/02
1,850
100
210 06 0219 / 4459
S WESTERN AVE AND W 79TH ST
1.0
05/30/05
05/31/05
10,563 04/05/05
04/05/05
10,489
100
210 06 0219 / 4459
S WESTERN AVE AND W 83RD ST
1.0
06/01/05
06/02/05
10,563 04/04/05
04/04/05
8,008
100
210 06 0219 / 4459
S WESTERN AVE AND W 87TH ST
.50
06/02/05
06/03/05
5,282 04/01/05
04/01/05
6,543
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
7.50
58,142
49,723
Locations
300 11 / 32207
W 83RD ST AND S WESTERN AVE
1.0
06/05/08
06/23/08
34,000 06/05/08
06/23/08
30,216
100
210 06 0070 / 4334
10720139 * Note Last Updated on 05-FEB-08 7900 S TALMAN AVE
1.0
06/01/99
12/01/99
30,000 04/27/99
07/22/99
30,279
100
Totals per Left Turn Arrow
Work Type: Signals 300 06 0096 / 5258
8146 S KEDZIE AVE
Work Type: TSM Install
2.0
64,000
60,495
Intersections 29.0
08/08/03
08/12/03
0 08/01/03
08/11/03
4,585
100
Locations
210 06 0108 / 4368
7700 S KEDZIE AVE
1.0
08/15/00
11/01/00
179,833 08/11/00
10/04/00
121,967
100
814 06 0097 / 16313
7700 S WESTERN AVE
1.0
11/19/92
11/19/92
0 11/19/92
11/19/92
77,020
100
2.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
179,833
198,987
Locations
300 07 0017 / 5440
ON S CALIFORNIA AVE FROM W 80TH ST TO W 81ST ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON S MOZART ST FROM W 82ND ST TO W 83RD ST
.0
03/01/06
12/31/06
0
0
0
300 07 0017 / 5440
ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE
2.0
04/18/06
11/18/06
5,800
0
0
300 11 / 32206
ON W 71ST ST FROM S ASHLAND AVE TO S CLAREMONT AVE
2.0
05/01/07
05/15/07
5,800 05/01/07
05/15/07
5,800
100
300 07 0018 / 5441
ON W COLUMBUS AVE FROM W 83RD ST TO W 87TH ST
15.0
04/18/06
11/18/06
6,000 10/05/06
10/16/06
2,976
100
Totals per Traffic Equipment Painting
19.0
17,600
8,776
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 203
1/1/2008 AND 12/31/2008
Ward 18 Lona Lane CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Traffic Totals per Traffic
319,575
322,566
Totals per Construction Phase
2,881,658
2,605,052
Totals for Ward 18
2,886,608
2,634,291
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 204
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,957
100
210 06 0240 / 4477
W 103RD ST AND S MAPLEWOOD AVE
.0
10/10/05
07/31/06
1,500 10/10/05
08/08/06
134
100
210 10 0025 / 4565
W 105TH ST AND S VINCENNES AVE
.0
03/01/03
12/31/04
0 03/01/03
12/31/04
1,999
100
210 10 0025 / 4565
W 107TH ST AND S VINCENNES AVE
.0
03/01/03
12/31/04
0 03/01/03
12/31/04
1,999
100
281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
.0
01/01/08
12/31/08
0
300 06 0292 / 5399
10228 S WESTERN AVE
1.0
03/08/05
05/09/05
Totals per Design/Engineering
Work Type: Feasibility Study 302 00 0079 / 5767
ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST
Totals per Lighting/Electrical
1.0
1,000 03/08/05
05/09/05
2,500
0
0
0
100
7,088
Projects .0
10/25/01
10/25/01
0 10/25/01 2,500
10/25/01
0 7,088
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 205
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 09 / 33085
ON S VANDERPOEL AVE FROM W 93RD ST TO W 95TH ST
12.0
11/13/08
11/14/08
4,800 11/13/08
11/14/08
3,098
100
302 00 0092 / 5774
9100-9199 S BEVERLY AVE
5.0
11/01/01
11/01/01
1,029 09/29/01
09/29/01
1,029
100
300 06 0069 / 5233
11301 S CHURCH ST
1.0
09/08/02
09/08/02
210 09/05/02
09/05/02
203
100
302 00 0092 / 5774
1500 W 104TH ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
1511 W 104TH ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
1529 W 104TH ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
1537 W 104TH ST
1.0
0 11/12/01
11/12/01
206
100
302 00 0092 / 5774
1559 W 104TH ST
1.0
0 11/12/01
11/12/01
206
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
23.0
6,039
5,360
Fixtures
300 06 0122 / 5275
ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE
34.0
05/10/03
05/13/03
11,600 05/07/03
05/09/03
6,045
100
300 05 0019 / 5134
ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE
40.0
04/04/05
11/18/05
16,000 08/15/05
09/01/05
12,806
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
74.0
27,600
18,851
1,236,035
1,356,982
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 206
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1638 / 7824
10916 S ALBANY AVE
1.0
08/21/97
08/21/97
0 08/21/97
08/21/97
300
100
805 06 1642 / 7828
11118 S ARTESIAN AVE
1.0
08/28/97
08/28/97
0 08/28/97
08/28/97
300
100
805 06 0843 / 7029
8956 S BELL AVE
1.0
10/28/96
10/28/96
0 10/28/96
10/28/96
300
100
805 06 0875 / 7061
9415 S BELL AVE
1.0
08/02/95
08/02/95
0 08/02/95
08/02/95
300
100
805 06 0876 / 7062
9425 S BELL AVE
1.0
10/17/95
10/17/95
0 10/17/95
10/17/95
300
100
805 06 1757 / 7943
9946 S BELL AVE
1.0
05/07/97
05/07/97
0 05/07/97
05/07/97
300
100
805 06 0855 / 7041
10222 S BELL AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 0812 / 6998
10810 S CENTRAL PARK AVE
1.0
04/19/96
04/19/96
0 04/19/96
04/19/96
300
100
805 06 1995 / 8181
9807 S CHARLES ST
1.0
03/26/96
03/26/96
0 03/26/96
03/26/96
300
100
805 06 0533 / 6719
10430 S CHURCH ST
1.0
06/20/96
06/20/96
0 06/20/96
06/20/96
300
100
805 06 0434 / 6620
10442 S CHURCH ST
1.0
06/20/96
06/20/96
0 06/20/96
06/20/96
300
100
805 06 0579 / 6765
10615 S FAIRFIELD AVE
1.0
07/22/96
07/22/96
0 07/22/96
07/22/96
300
100
805 06 0560 / 6746
10629 S FAIRFIELD AVE
1.0
07/10/96
07/10/96
0 07/10/96
07/10/96
300
100
805 06 0541 / 6727
10828 S FAIRFIELD AVE
1.0
07/31/96
07/31/96
0 07/31/96
07/31/96
300
100
805 06 1126 / 7312
10717 S HALE AVE
1.0
06/12/95
06/12/95
0 06/12/95
06/12/95
300
100
805 06 1555 / 7741
9418 S HAMILTON AVE
1.0
10/16/97
10/16/97
0 10/16/97
10/16/97
300
100
805 06 1071 / 7257
10418 S HAMILTON AVE
1.0
05/26/95
05/26/95
0 05/26/95
05/26/95
300
100
805 06 1073 / 7259
11310 S HAMLIN AVE
1.0
05/31/95
05/31/95
0 05/31/95
05/31/95
300
100
805 06 1057 / 7243
11402 S HAMLIN AVE
1.0
10/04/95
10/04/95
0 10/04/95
10/04/95
300
100
805 06 1075 / 7261
11408 S HAMLIN AVE
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
302 00 0092 / 5774
10957 S HERMOSA AVE
1.0
0 07/17/01
07/17/01
236
100
805 06 1094 / 7280
10820 S HOMAN AVE
1.0
10/11/96
10/11/96
0 10/11/96
10/11/96
300
100
805 06 1661 / 7847
11151 S HOMAN AVE
1.0
08/05/97
08/05/97
0 08/05/97
08/05/97
300
100
805 06 1212 / 7398
9319 S HOYNE AVE
1.0
07/18/96
07/18/96
0 07/18/96
07/18/96
300
100
805 06 1872 / 8058
10206 S LONGWOOD DR
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0585 / 6771
10022 S PROSPECT AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0556 / 6742
10035 S PROSPECT AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0570 / 6756
10108 S PROSPECT AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0558 / 6744
10159 S PROSPECT AVE
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0580 / 6766
10209 S PROSPECT AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0561 / 6747
10433 S PROSPECT AVE
1.0
06/20/96
06/20/96
0 06/20/96
06/20/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 207
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0562 / 6748
10502 S PROSPECT AVE
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0563 / 6749
10631 S PULASKI RD
1.0
03/20/96
03/20/96
0 03/20/96
03/20/96
300
100
805 06 0622 / 6808
9515 S SEELEY AVE
1.0
06/10/96
06/10/96
0 06/10/96
06/10/96
300
100
805 06 1471 / 7657
11454 S ST LOUIS AVE
1.0
11/17/97
11/17/97
0 11/17/97
11/17/97
300
100
805 06 0424 / 6610
10642 S TALMAN AVE
1.0
08/05/96
08/05/96
0 08/05/96
08/05/96
300
100
805 06 1551 / 7737
10741 S TALMAN AVE
1.0
10/14/97
10/14/97
0 10/14/97
10/14/97
300
100
805 06 1711 / 7897
10949 S TALMAN AVE
1.0
06/18/97
06/18/97
0 06/18/97
06/18/97
300
100
805 06 0441 / 6627
11343 S TALMAN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0361 / 6547
11025 S TROY ST
1.0
08/30/96
08/30/96
0 08/30/96
08/30/96
300
100
805 06 0362 / 6548
11251 S TROY ST
1.0
02/10/95
02/10/95
0 02/10/95
02/10/95
300
100
805 06 0501 / 6687
10825 S WASHTENAW AVE
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 0502 / 6688
10859 S WASHTENAW AVE
1.0
03/15/95
03/15/95
0 03/15/95
03/15/95
300
100
805 06 1202 / 7388
10030 S WESTERN AVE
1.0
12/17/97
12/17/97
0 12/17/97
12/17/97
300
100
805 06 1734 / 7920
10117 S WESTERN AVE
1.0
06/09/97
06/09/97
0 06/09/97
06/09/97
300
100
805 06 0517 / 6703
10150 S WESTERN AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0518 / 6704
10216 S WESTERN AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 0519 / 6705
10220 S WESTERN AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
300 06 0139 / 5289
10444 S WESTERN AVE
1,948.0
03/01/06
09/01/06
44,852 07/01/06
07/18/06
58,857
100
302 00 0092 / 5774
10444 S WESTERN AVE
46.0
0 02/06/01
01/24/02
10,840
100
805 06 1478 / 7664
10550 S WESTERN AVE
1.0
11/21/97
11/21/97
0 11/21/97
11/21/97
300
100
805 06 1763 / 7949
10734 S WHIPPLE ST
1.0
05/12/97
05/12/97
0 05/12/97
05/12/97
300
100
805 06 0459 / 6645
10935 S WOOD ST
1.0
11/02/95
11/02/95
0 11/02/95
11/02/95
300
100
805 06 1587 / 7773
1935 W 102ND ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1156 / 7342
2617 W 103RD PL
1.0
11/05/96
11/05/96
0 11/05/96
11/05/96
300
100
805 06 0958 / 7144
1901 W 103RD ST
1.0
04/03/96
04/03/96
0 04/03/96
04/03/96
300
100
805 06 0959 / 7145
1913 W 103RD ST
1.0
04/03/96
04/03/96
0 04/03/96
04/03/96
300
100
805 06 1645 / 7831
3951 W 104TH ST
1.0
09/03/97
09/03/97
0 09/03/97
09/03/97
300
100
805 06 0960 / 7146
1431 W 105TH ST
1.0
06/09/95
06/09/95
0 06/09/95
06/09/95
300
100
805 06 0931 / 7117
1527 W 107TH ST
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
805 06 0918 / 7104
3819 W 110TH PL
1.0
03/14/96
03/14/96
0 03/14/96
03/14/96
300
100
805 06 0934 / 7120
3838 W 110TH PL
1.0
03/14/96
03/14/96
0 03/14/96
03/14/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 208
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0936 / 7122
3849 W 110TH PL
1.0
03/14/96
03/14/96
0 03/14/96
03/14/96
300
100
805 06 1606 / 7792
3234 W 110TH ST
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
805 06 0938 / 7124
2545 W 111TH ST
1.0
07/10/96
07/10/96
0 07/10/96
07/10/96
300
100
805 06 0939 / 7125
3103 W 111TH ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 0941 / 7127
2160 W 112TH ST
1.0
07/07/95
07/07/95
0 07/07/95
07/07/95
300
100
805 06 1774 / 7960
2504 W 115TH ST
1.0
04/15/97
04/15/97
0 04/15/97
04/15/97
300
100
805 06 0916 / 7102
2534 W 117TH ST
1.0
11/11/96
11/11/96
0 11/11/96
11/11/96
300
100
805 06 1516 / 7702
1908 W MONTEREY AVE
1.0
10/30/97
10/30/97
0 10/30/97
10/30/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
10444 S WESTERN AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
10444 S WESTERN AVE
Work Type: Flood Light Install
2,062.0
44,852
90,033
Lamps 1,715.0
06/01/07
12/31/07
50,489 12/28/07
01/04/08
48,963
100
0 08/27/02
09/13/02
29,497
100
Installations 1,620.0
Fixtures
300 06 0167 / 5306
S ESMOND ST AND W MONTEREY AVE
1.0
0 11/13/99
11/13/99
351
100
302 00 0092 / 5774
10534 S MAPLEWOOD AVE
1.0
0 09/07/01
09/07/01
404
100
302 00 0092 / 5774
10536 S MAPLEWOOD AVE
1.0
0 09/07/01
09/07/01
404
100
302 00 0092 / 5774
10550 S MAPLEWOOD AVE
1.0
0 09/07/01
09/07/01
404
100
302 00 0092 / 5774
10304 S WOOD ST
1.0
0 07/23/01
07/23/01
471
100
302 00 0092 / 5774
10312 S WOOD ST
1.0
0 07/23/01
07/23/01
471
100
300 06 0167 / 5306
3820 W 103RD ST
1.0
0 01/06/99
01/06/99
351
100
300 06 0167 / 5306
4210 W 115TH ST
7.0
0 02/06/99
02/06/99
2,457
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
14.0
0
5,313
0
0
Blocks .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 209
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts
Installations
281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
.0
01/01/08
12/31/08
300 06 0292 / 5399
10228 S WESTERN AVE
.0
03/01/05
12/31/05
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts 300 06 0199 / 5324
W 111TH ST AND S LAWNDALE AVE
Work Type: Ornamental Lighting 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
300 06 0109 / 5264
2200-2299 W 95TH ST
Totals per Ornamental Lighting
Work Type: POD Camera Pole 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
300 11 / 32208
1900-1950 W 91ST ST
Totals per POD Camera Pole
Work Type: Residential Regrouping 300 06 0270 / 5378
10444 S WESTERN AVE
Work Type: Residntl Staggered Lighting
06/22/05
7,262
0
0
6,276
100
6,276
Projects
ON W 91ST ST FROM S WESTERN AVE TO S CLAREMONT AVE
Work Type: Loop Lighting 281 00 / 33670
.0
0 7,262 06/17/05
14,900 08/20/01
08/24/01
2,223
100
0
0
Blocks .0
01/01/08
12/31/08
.0
01/01/08
12/31/08
1.0
11/01/98
12/01/98
0
Blocks
1.0
0 80,000 11/10/98
12/01/98
80,000
0
0
76,427
100
76,427
Poles .0
01/01/08
12/31/08
1.0
06/01/07
06/10/07
1.0
0 1,200 06/06/07
06/06/07
0
0
1,200
100
1,200
1,200
0
0
0
Lamps .0
03/01/08
12/01/08
Blocks
300 06 0298 / 5405
ON S CENTRAL PARK AVE FROM W 107TH ST TO W 109TH ST
2.0
04/07/05
05/07/05
0 04/07/05
06/02/05
118,215
100
300 06 0308 / 5414
ON S CENTRAL PARK AVE FROM W 109TH ST TO W 111TH ST
2.0
05/10/06
07/28/06
156,357 05/10/06
07/28/06
137,136
100
Project has been completed as of 7/28/2006 Note Last Updated on 25-AUG-06 Totals per Residntl Staggered Lighting
4.0
156,357
255,351
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 210
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 06 0235 / 5349
ON S CENTRAL PARK AVE FROM W 103RD ST TO W 105TH ST
2.0
06/12/03
08/12/03
146,206 06/03/03
08/04/03
131,586
100
300 06 0267 / 5375
ON S CENTRAL PARK AVE FROM W 105TH ST TO W 107TH ST
2.0
03/22/04
05/22/04
144,219 03/26/04
05/04/04
142,139
100
300 06 0078 / 5241
8900-9000 S BEVERLY AVE
1.0
02/28/01
05/01/01
38,730 11/24/00
01/22/01
37,953
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
Work Type: Short Arm Installs - Residntl 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
Work Type: Strt Light Pole Painting
5.0
329,155
311,678
Locations .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
Locations .0
Locations
302 00 0079 / 5767
ON S LONGWOOD DR FROM W 91ST ST TO W 111TH ST
18.0
10/01/01
10/06/01
2,300 10/01/01
10/12/01
2,300
100
300 06 0108 / 5263
ON S PULASKI RD FROM W 99TH ST TO W 103RD ST
28.0
05/10/03
05/16/03
7,450 05/18/03
05/21/03
6,020
100
302 00 0077 / 5765
ON S WESTERN AVE FROM W 111TH ST TO W 119TH ST
96.0
0 04/18/99
04/30/99
8,388
100
300 06 0108 / 5263
ON W 103RD ST FROM S LONGWOOD DR TO S WESTERN AVE
29.0
04/28/03
05/02/03
13,900 05/05/03
05/16/03
10,710
100
300 05 0019 / 5134
ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE
60.0
04/04/05
11/18/05
15,000 08/15/05
09/01/05
12,329
100
302 00 0076 / 5764
ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE
114.68
04/14/98
04/21/98
0 04/14/98
04/21/98
1,950
100
300 04 0216 / 5114
ON W 95TH ST FROM S WESTERN AVE TO S HOYNE AVE
33.0
05/01/06
11/01/06
7,065 05/17/06
07/12/06
7,065
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
W 111TH ST AND S LAWNDALE AVE
Work Type: Strt Lighting
378.68
45,715
48,762
0
0
0
Blocks .0
01/01/08
12/31/08
Blocks
300 06 0262 / 5370
ON S CALIFORNIA AVE FROM W 99TH ST TO W 103RD ST
5.0
11/01/02
03/15/03
180,000 10/22/02
02/28/03
163,979
100
300 06 0247 / 5357
ON W 112TH PL FROM S CENTRAL PARK AVE TO S ST LOUIS AVE
2.0
08/15/03
10/15/03
129,000 06/19/03
08/18/03
128,205
100
300 06 0247 / 5357
ON W 96TH ST FROM S LEAVITT ST TO S WESTERN AVE
2.0
11/01/04
12/15/04
155,000 11/01/04
12/23/04
147,135
100
9.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
10444 S WESTERN AVE
464,000
439,319
Lamps 1,628.0
03/01/04
12/01/04
8,466 07/31/06
08/14/06
17,729
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 211
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S WESTERN AVE AND W 101ST ST
1.0
0 04/03/02
04/03/02
1,850
100
210 06 0130 / 4389
S WESTERN AVE AND W 103RD ST
1.0
0 10/22/02
10/22/02
11,608
100
210 06 0219 / 4459
S WESTERN AVE AND W 107TH ST
1.0
06/03/05
06/04/05
10,563 03/31/05
03/31/05
8,368
100
210 06 0219 / 4459
S WESTERN AVE AND W 109TH ST
1.0
06/04/05
06/05/05
10,563 03/31/05
03/31/05
8,368
100
210 06 0130 / 4389
S WESTERN AVE AND W 111TH ST
1.0
0 04/03/02
04/03/02
1,850
100
210 06 0219 / 4459
S WESTERN AVE AND W 111TH ST
1.0
06/07/05
06/08/05
10,563 05/01/05
05/01/05
10,084
100
210 06 0219 / 4459
S WESTERN AVE AND W 113TH PL
1.0
04/30/05
04/30/05
10,563 04/24/05
04/24/05
6,468
100
210 06 0219 / 4459
S WESTERN AVE AND W 115TH ST
1.0
06/09/05
06/10/05
10,563 04/29/05
04/29/05
8,008
100
210 06 0219 / 4459
S WESTERN AVE AND W 87TH ST
.50
06/02/05
06/03/05
5,282 04/01/05
04/01/05
6,543
100
Totals per LED Signal Head Install
Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477
W 103RD ST AND S MAPLEWOOD AVE
8.50
58,097
63,147
Locations 8.0
11/01/05
07/19/07
15,000 11/01/05
10/25/06
5,293
100
08/04/03
08/12/03
0 08/01/03
08/10/03
5,376
100
Constructed BY operations Note Last Updated on 30-MAY-07
Work Type: Signals 300 06 0096 / 5258
10444 S WESTERN AVE
Work Type: TSM Install
Intersections 34.0
Locations
814 06 0139 / 16353
11099 S HOMAN AVE
1.0
04/27/93
04/27/93
0 04/27/93
04/27/93
93,077
100
210 06 0105 / 4365
11100 S KEDZIE AVE
1.0
08/15/00
11/01/00
75,000 08/08/00
10/04/00
45,517
100
814 06 0352 / 16550
10299 S LONGWOOD DR
1.0
07/02/96
07/02/96
0 07/02/96
07/02/96
100,000
100
210 06 0008 / 4283
10300 S ST LOUIS AVE
1.0
08/01/98
12/01/98
150,000 07/29/98
07/15/99
113,551
100
814 06 0344 / 16542
11338 S WESTERN AVE
1.0
05/15/96
05/15/96
0 05/15/96
05/15/96
113,510
100
210 06 0058 / 4325
3700 W 111TH ST
1.0
06/01/99
12/31/99
153,000 06/01/99
09/15/99
88,318
100
6.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 05 0019 / 5134
ON W 103RD ST FROM S WESTERN AVE TO S KEDZIE AVE
Totals per Traffic Totals per Construction Phase
378,000
553,973
Locations 17.0
04/04/05
11/18/05
5,300 08/15/05
09/01/05
8,796
456,397
636,585
1,692,432
1,993,566
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 212
1/1/2008 AND 12/31/2008
Ward 19 Virginia A. Rugai CIP/CPM Number Totals for Ward 19
Street Address
No of Units
Start
WIP Estimate End
Cost 1,694,932
Start
WIP Actual (to Date) End
Cost 2,000,654
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 213
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0292 / 5399
5517 S MICHIGAN AVE
Projects 1.0
1,000 08/03/05
08/03/05
384
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 214
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON E 64TH ST FROM S WOODLAWN AVE TO S KIMBARK AVE
4.0
1,500 05/08/02
05/08/02
1,500
100
302 00 0092 / 5774
ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST
9.0
0 09/27/01
09/27/01
1,852
100
300 06 0069 / 5233
ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST
4.0
05/24/02
05/24/02
840 05/21/02
05/21/02
904
100
302 00 0092 / 5774
ON S SANGAMON ST FROM W 52ND ST TO W 53RD ST
4.0
04/15/02
04/15/02
840
300 06 0069 / 5233
6327-6401 S INGLESIDE AVE
4.0
1,500 04/16/02
04/16/02
1,500
100
300 06 0069 / 5233
6300 S RHODES AVE
9.0
10/21/02
10/21/02
3,600 10/18/02
10/18/02
4,235
100
300 06 0122 / 5275
5859 S STATE ST
1,950.0
08/01/03
09/09/03
765,250 08/01/03
10/14/03
441,011
100
300 06 0069 / 5233
6217-6251 S UNIVERSITY AVE
1,125 05/08/02
05/08/02
1,125
100
Totals per 250 Watt Changeout
Work Type: Alley Lighting/Lamps 300 06 0204 / 5327
ON S COTTAGE GROVE AVE FROM E 62ND ST TO E 63RD ST
300 06 0204 / 5327
ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST
300 06 0204 / 5327
3.0 1,987.0
0
774,655
452,127
Installations 3.0
08/13/01
08/13/01
960 09/29/01
09/29/01
960
100
10.0
08/14/01
08/14/01
3,200 09/29/01
09/29/01
2,060
100
800 E 63RD ST
2.0
08/09/01
08/09/01
640 09/29/01
09/29/01
640
100
805 06 0963 / 7149
367 E 68TH ST
1.0
03/27/96
03/27/96
0 03/27/96
03/27/96
300
100
805 06 1469 / 7655
360 E 69TH ST
2.0
12/04/97
12/04/97
0 12/04/97
12/04/97
600
100
805 06 1475 / 7661
370 E 69TH ST
1.0
11/19/97
11/19/97
0 11/19/97
11/19/97
300
100
805 06 1526 / 7712
6200 S DR MARTIN LUTHER KING JR DR
1.0
11/06/97
11/06/97
0 11/06/97
11/06/97
300
100
805 06 1887 / 8073
6812 S DR MARTIN LUTHER KING JR DR
1.0
10/21/96
10/21/96
0 10/21/96
10/21/96
300
100
805 06 2041 / 8227
6812 S DR MARTIN LUTHER KING JR DR
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
805 06 2054 / 8240
6838 S DR MARTIN LUTHER KING JR DR
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 2043 / 8229
6844 S DR MARTIN LUTHER KING JR DR
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 2064 / 8250
6846 S DR MARTIN LUTHER KING JR DR
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 0644 / 6830
6427 S EVANS AVE
1.0
06/07/95
06/07/95
0 06/07/95
06/07/95
300
100
302 00 0092 / 5774
6523 S HALSTED ST
1.0
0 12/31/01
12/31/01
236
100
805 06 1523 / 7709
5914 S LOWE AVE
1.0
0 11/04/97
11/04/97
300
100
302 00 0092 / 5774
4858 S MARSHFIELD AVE
1.0
0 10/23/01
10/23/01
236
100
805 06 0531 / 6717
6754 S PRAIRIE AVE
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
300 06 0139 / 5289
5859 S STATE ST
1,048.0
03/01/06
09/01/06
26,012 04/01/06
04/15/06
31,664
100
302 00 0092 / 5774
5859 S STATE ST
17.0
0 02/02/01
01/20/02
4,006
100
Totals per Alley Lighting/Lamps
1,095.0
11/04/97
11/04/97
30,812
43,702
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 215
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
5859 S STATE ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5859 S STATE ST
Work Type: Flood Light Install
Lamps 2,170.0
06/01/07
12/31/07
63,884 11/16/07
12/05/07
61,953
100
0 07/24/02
07/27/02
37,782
100
Installations 2,075.0
Fixtures
300 06 0198 / 5323
RANDOLPH TOWERS (CHA)
17,762 06/04/01
06/06/01
14,691
100
302 00 0092 / 5774
S DAMEN AVE AND W 48TH ST
.50
0 09/25/01
09/25/01
202
100
302 00 0092 / 5774
S WINCHESTER AVE AND W 48TH ST
1.0
0 09/25/01
09/25/01
404
100
300 06 0167 / 5306
6410 S DANTE AVE
6.0
0 10/27/99
10/27/99
2,105
100
300 06 0071 / 5234
5531 S DR MARTIN LUTHER KING JR DR
0
114
100
17,762
17,516
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0256 / 5366
ON W 59TH ST FROM S PRINCETON AVE TO S WENTWORTH AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
6357 S COTTAGE GROVE AVE
Work Type: Residntl Staggered Lighting 300 06 0298 / 5405
ON S RHODES AVE FROM E 63RD ST TO E 65TH ST
Work Type: Residntl Strt Lighting/Lamps
02/24/01
11/20/00
06/07/01
11/23/00
7.50
Installations 13.0
02/15/04
08/01/04
21,100 08/09/04
03/01/08
12/01/08
0
07/01/05
09/01/05
0 06/17/05
05/16/05
23,110
100
0
0
09/23/05
135,213
100
Lamps .0
Blocks 2.0
Blocks
300 06 0267 / 5375
ON S RHODES AVE FROM E 61ST ST TO E 62ND ST
2.0
10/15/04
12/15/04
154,252 09/09/04
12/21/04
154,552
100
300 06 0235 / 5349
ON S WABASH AVE FROM E 55TH ST TO E 57TH ST
2.0
05/02/03
07/02/03
175,814 05/02/03
08/01/03
157,797
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial
4.0
330,066
312,349
Locations
302 00 0092 / 5774
4619 S HERMITAGE AVE
1.0
0 02/23/01
02/23/01
378
100
302 00 0092 / 5774
4645 S HERMITAGE AVE
1.0
0 02/23/01
02/23/01
378
100
2.0
0
756
1,523,070
1,899,429
Totals per Short Arm Installs - Arterial Totals per Lighting/Electrical
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 216
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0108 / 5263
ON E 63RD ST FROM S STATE ST TO S STONY ISLAND AVE
70.0
05/11/03
05/31/03
17,000 07/01/03
07/28/03
16,870
100
300 06 0108 / 5263
ON S COTTAGE GROVE AVE FROM E 60TH ST TO E 68TH ST
79.0
05/20/03
06/03/03
18,500 07/01/03
07/28/03
18,480
100
300 06 0108 / 5263
ON S DR MARTIN LUTHER KING JR DR FROM E 55TH ST TO E 69TH ST
90.0
05/28/03
06/15/03
21,500 07/01/03
07/28/03
22,120
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 300 06 0204 / 5327
ON S LANGLEY AVE FROM E 61ST ST TO E 63RD ST
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
5859 S STATE ST
239.0
57,000
57,470
Blocks 9.0
10/13/01
10/13/01
1,890 09/27/01
09/27/01
1,890
100
03/01/04
12/01/04
9,334 07/31/06
09/07/06
19,548
100
Lamps 1,795.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 217
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 300 06 0122 / 5275
Fixtures 200.0
10/15/03
10/30/03
190,000 10/01/03
11/03/03
164,675
100
300 06 0204 / 5327
ON E 63RD ST FROM S DR MARTIN LUTHER KING JR DR TO S COTTAGE GROVE AVE E 63RD ST AND S COTTAGE GROVE AVE
8.0
08/10/01
08/10/01
2,960 12/04/01
12/05/01
2,960
100
805 06 2823 / 9009
1405 E 63RD ST
26.0
05/04/93
05/04/93
0 05/04/93
05/04/93
19,500
100
805 06 2965 / 9151
1405 E 64TH ST
26.0
02/24/94
02/24/94
0 02/24/94
02/24/94
19,500
100
805 06 2898 / 9084
1405 E 65TH ST
26.0
10/19/93
10/19/93
0 10/19/93
10/19/93
19,500
100
805 06 2370 / 8556
107 E GARFIELD BLVD
14.0
03/24/93
03/24/93
0 03/24/93
03/24/93
10,500
100
805 06 2393 / 8579
107 E GARFIELD BLVD
14.0
03/24/93
03/24/93
0 03/24/93
03/24/93
10,500
100
805 06 2797 / 8983
390 E MARQUETTE RD
33.0
06/21/94
06/21/94
0 06/21/94
06/21/94
24,750
100
805 06 2798 / 8984
390 E MARQUETTE RD
14.0
06/30/94
06/30/94
0 06/30/94
06/30/94
10,500
100
805 06 2466 / 8652
1398 E MARQUETTE RD
30.0
11/02/93
11/02/93
0 11/02/93
11/02/93
22,500
100
805 06 2832 / 9018
4995 S ABERDEEN ST
12.0
06/01/94
06/01/94
0 06/01/94
06/01/94
9,000
100
805 06 2137 / 8323
4905 S ASHLAND AVE
8.0
01/31/94
01/31/94
0 01/31/94
01/31/94
6,000
100
805 06 2618 / 8804
6720 S DR MARTIN LUTHER KING JR DR
16.0
10/27/94
10/27/94
0 10/27/94
10/27/94
12,000
100
805 06 2413 / 8599
6731 S DR MARTIN LUTHER KING JR DR
17.0
11/27/95
11/27/95
0 11/27/95
11/27/95
12,750
100
805 06 2414 / 8600
6731 S DR MARTIN LUTHER KING JR DR
21.0
11/27/95
11/27/95
0 11/27/95
11/27/95
15,750
100
805 06 2795 / 8981
4901 S HERMITAGE AVE
2.0
03/23/94
03/23/94
0 03/23/94
03/23/94
1,500
100
805 06 2573 / 8759
4905 S LAFLIN ST
4.0
03/15/95
03/15/95
0 03/15/95
03/15/95
3,000
100
805 06 2249 / 8435
4901 S LOOMIS BLVD
8.0
11/09/93
11/09/93
0 11/09/93
11/09/93
6,000
100
805 06 2557 / 8743
6105 S PRINCETON AVE
8.0
04/20/95
04/20/95
0 04/20/95
04/20/95
6,000
100
805 06 2234 / 8420
4901 S RACINE AVE
8.0
01/11/94
01/11/94
0 01/11/94
01/11/94
6,000
100
300 06 0217 / 5337
5859 S STATE ST
420.0
03/17/04
03/22/04
23,607 01/22/04
01/27/04
16,799
100
805 06 2809 / 8995
6305 S STATE ST
52.0
06/07/93
06/07/93
0 06/07/93
06/07/93
39,000
100
302 00 0071 / 5759
6440 S STATE ST
0 12/27/98
01/07/99
36,078
100
805 06 2514 / 8700
6505 S STATE ST
8.0
04/29/93
04/29/93
0 04/29/93
04/29/93
6,000
100
805 06 2516 / 8702
6505 S STATE ST
8.0
04/19/93
04/19/93
0 04/19/93
04/19/93
6,000
100
805 06 2810 / 8996
4901 S THROOP ST
8.0
06/01/94
06/01/94
0 06/01/94
06/01/94
6,000
100
805 06 2183 / 8369
6299 S WENTWORTH AVE
12.0
04/08/93
04/08/93
0 04/08/93
04/08/93
9,000
100
805 06 2185 / 8371
6299 S WENTWORTH AVE
14.0
03/28/97
03/28/97
0 03/28/97
03/28/97
10,500
100
805 06 2239 / 8425
6501 S WENTWORTH AVE
24.0
04/08/93
04/08/93
0 04/08/93
04/08/93
18,000
100
805 06 2827 / 9013
6200 S YALE AVE
11.0
04/28/94
04/28/94
0 04/28/94
04/28/94
8,250
100
805 06 2679 / 8865
101 W 57TH PL
12.0
07/22/94
07/22/94
0 07/22/94
07/22/94
9,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 218
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
302 00 0072 / 5760
100 W 59TH ST
1.0
0 01/18/00
02/02/00
14,424
100
805 06 2749 / 8935
101 W 59TH ST
18.0
01/02/92
01/02/92
0 01/02/92
01/02/92
13,500
100
805 06 2680 / 8866
101 W 60TH ST
12.0
07/22/94
07/22/94
0 07/22/94
07/22/94
9,000
100
805 06 2845 / 9031
305 W 61ST PL
12.0
07/15/94
07/15/94
0 07/15/94
07/15/94
9,000
100
805 06 2682 / 8868
118 W 61ST ST
30.0
08/02/94
08/02/94
0 08/02/94
08/02/94
22,500
100
805 06 2825 / 9011
599 W 61ST ST
8.0
01/13/93
01/13/93
0 01/13/93
01/13/93
6,000
100
302 00 0071 / 5759
30 W 63RD ST
0 09/01/98
09/09/98
35,446
100
302 00 0071 / 5759
50 W 63RD ST
0 08/22/98
08/28/98
11,638
100
302 00 0071 / 5759
110 W 63RD ST
0 08/15/98
08/17/98
1,940
100
302 00 0071 / 5759
120 W 63RD ST
0 08/01/98
08/12/98
23,053
100
805 06 2808 / 8994
139 W 63RD ST
12.0
07/19/91
07/19/91
0 07/19/91
07/19/91
9,000
100
805 06 2831 / 9017
139 W 63RD ST
12.0
07/19/91
07/19/91
0 07/19/91
07/19/91
9,000
100
805 06 2834 / 9020
139 W 63RD ST
8.0
07/19/91
07/19/91
0 07/19/91
07/19/91
6,000
100
805 06 2269 / 8455
199 W 63RD ST
8.0
01/11/94
01/11/94
0 01/11/94
01/11/94
6,000
100
805 06 2286 / 8472
220 W 63RD ST
8.0
01/11/94
01/11/94
0 01/11/94
01/11/94
6,000
100
805 06 2848 / 9034
599 W ENGLEWOOD AVE
8.0
01/21/93
01/21/93
0 01/21/93
01/21/93
6,000
100
Totals per Underpass Lighting
1,201.0
216,567
736,013
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 219
1/1/2008 AND 12/31/2008
Ward 20 Willie Cochran CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S INDIANA AVE AND E 69TH ST
.50
0 05/21/02
05/21/02
3,662
100
210 06 0130 / 4389
S SOUTH CHICAGO AVE AND S KEEFE AVE
.50
0 04/30/02
04/30/02
925
100
1.0
0
Totals per LED Signal Head Install
Work Type: New Signal 210 06 0075 / 4339
Locations
E 57TH ST AND S MICHIGAN AVE
Work Type: Removal Temp Wiring - Signals
4,587
07/01/04
09/01/04
124,500 07/01/04
09/17/04
104,604
100
Crossings
300 06 0197 / 5322
S COTTAGE GROVE AVE AND E 63RD ST
3.0
03/20/01
04/20/01
12,000 03/14/01
04/07/01
7,563
100
300 06 0197 / 5322
S DR MARTIN LUTHER KING JR DR AND E 65TH ST
1.0
03/02/01
04/20/01
4,000 03/02/01
04/09/01
1,462
100
300 06 0197 / 5322
S ST LAWRENCE AVE AND E 63RD ST
3.0
03/20/01
04/20/01
12,000 03/08/01
03/21/01
9,066
100
300 06 0197 / 5322
S ST LAWRENCE AVE AND E 67TH ST
1.0
03/20/01
04/20/01
4,000 03/13/01
04/09/01
5,321
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
5859 S STATE ST
Totals per Traffic
8.0
32,000
23,412
Intersections 71.0
08/05/03
08/13/03
0 08/07/03
08/13/03
11,227
156,500
143,830
Totals per Construction Phase
1,679,570
2,043,259
Totals for Ward 20
1,680,570
2,043,643
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 220
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON S ADA ST FROM W 81ST ST TO W 83RD ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,231
100
300 06 / 32146
ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE
.0
05/01/07
10/31/07
1,950 06/21/07
07/19/07
1,000
100
300 06 0275 / 5383
ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD
.0
10/01/04
06/30/05
0 10/01/04
06/30/05
2,713
100
210 10 0025 / 4565
W 103RD ST AND S VINCENNES AVE
.0
03/01/03
06/25/02
0 03/01/03
06/25/02
1,332
100
210 10 0025 / 4565
W 105TH ST AND S VINCENNES AVE
.0
03/01/03
12/31/04
0 03/01/03
12/31/04
1,999
100
210 10 0025 / 4565
W 107TH ST AND S VINCENNES AVE
.0
03/01/03
12/31/04
0 03/01/03
12/31/04
1,999
100
210 06 0243 / 4480
W 95TH ST AND S LAFAYETTE AVE
.0
01/10/07
02/01/07
700 01/01/07
01/26/07
2,549
100
210 06 0243 / 4480
W 98TH PL AND S HALSTED ST
.0
300 06 / 32275
8900-9100 S CARPENTER ST
.0
03/01/07
10/31/07
300 06 / 32021
7600-7900 S THROOP ST
.0
09/12/06
300 06 0315 / 5421
201 W 95TH ST
.0
01/26/07
0
0
0
2,277
100
3,900 02/21/07
03/21/07
09/18/06
0 09/12/06
09/18/06
0
0
08/06/07
15,000 01/26/07
03/27/07
7,500
100
Project finished on 3/26/2007 Note Last Updated on 11-FEB-08 Electronic Files with proposed drives & work received on Jan 24th, 2007 Note Last Updated on 26-JAN-07 Totals per Design/Engineering
.0
21,550
23,599
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 221
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON S GREEN ST FROM W 80TH ST TO W 83RD ST
300 06 0069 / 5233
ON S MARSHFIELD AVE FROM W 81ST ST TO W 83RD ST
5,200 01/07/03
01/07/03
2,758
100
1,500 05/06/02
05/06/02
1,500
300 06 0069 / 5233
ON S PEORIA ST FROM W 80TH ST TO W 83RD ST
13.0
01/10/03
100
01/10/03
5,200 01/07/03
01/07/03
2,757
300 06 0069 / 5233
ON S SANGAMON ST FROM W 80TH ST TO W 83RD ST
13.0
100
01/10/03
01/10/03
5,200 01/07/03
01/07/03
2,758
300 06 0069 / 5233
ON S WALLACE ST FROM W 90TH ST TO W 92ND ST
100
7.0
01/04/03
01/04/03
2,800 12/31/02
12/31/02
1,073
300 06 0069 / 5233
100
8300 S ABERDEEN ST
5.0
05/11/02
05/11/02
1,050 05/08/02
05/08/02
1,015
100
300 06 0069 / 5233
8400 S ABERDEEN ST
4.0
03/03/02
03/03/02
840 02/28/02
02/28/02
812
100
300 09 / 33087
8000-8100 S EMERALD AVE
4.0
06/09/08
06/10/08
1,600 06/09/08
06/10/08
1,141
100
300 09 / 33087
MATERIALS ORDERED 07/01/08 Note Last Updated on 01-JUL-08 9408 S HARVARD AVE
1.0
11/05/08
11/05/08
400 11/05/08
11/05/08
265
100
302 00 0092 / 5774
8801 S HONORE ST
1.0
0 08/20/01
08/20/01
206
100
302 00 0092 / 5774
8815 S HONORE ST
1.0
0 08/20/01
08/20/01
206
100
300 06 0069 / 5233
8800 S LOOMIS ST
4.0
01/10/03
01/10/03
1,600 01/07/03
01/07/03
1,500
100
300 06 0069 / 5233
8800 S LOWE AVE
4.0
01/10/03
01/10/03
1,600 01/07/03
01/07/03
1,500
100
302 00 0092 / 5774
8900-8999 S LOWE AVE
5.0
10/16/01
10/16/01
1,029 09/29/01
09/29/01
1,029
100
302 00 0092 / 5774
8101 S MARSHFIELD AVE
1.0
0 01/18/02
01/18/02
203
100
302 00 0092 / 5774
8201 S MARSHFIELD AVE
1.0
0 01/18/02
01/18/02
203
100
300 06 0069 / 5233
8400 S PEORIA ST
4.0
01/10/03
01/10/03
1,600 01/07/03
01/07/03
1,500
100
300 09 / 33087
8817 S PRINCETON AVE
1.0
11/05/08
11/05/08
400 11/05/08
11/05/08
261
100
300 09 / 33087
8833 S PRINCETON AVE
1.0
11/05/08
11/05/08
400 11/05/08
11/05/08
261
100
300 09 / 33087
9334 S STEWART AVE
1.0
11/05/08
11/05/08
400 11/05/08
11/05/08
265
100
300 09 / 33087
8100-8300 S THROOP ST
10.0
02/01/08
12/31/08
4,000 10/30/08
10/30/08
4,000
100
302 00 0092 / 5774
9337 S THROOP ST
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
8700-8799 S WALLACE ST
15.0
11/10/01
11/12/01
4,116 10/03/01
10/03/01
3,090
100
300 06 0069 / 5233
9000 S WALLACE ST
5.0
07/05/02
07/05/02
1,050 07/02/02
07/02/02
1,073
100
300 06 0069 / 5233
1300 W 88TH ST
4.0
01/10/03
01/10/03
1,600 01/07/03
01/07/03
1,343
100
300 06 0069 / 5233
1400 W 88TH ST
4.0
01/10/03
01/10/03
1,600 01/07/03
01/07/03
1,343
100
300 09 / 33087
245 W 91ST ST
1.0
11/05/08
11/05/08
400 11/05/08
11/05/08
265
100
300 09 / 33087
226 W 94TH ST
2.0
11/05/08
11/05/08
800 11/05/08
11/05/08
530
100
Totals per 250 Watt Changeout
13.0
01/10/03
01/10/03
4.0
130.0
44,621
33,093
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 222
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0204 / 5327
W 91ST ST AND S ABERDEEN ST
2.0
08/08/01
08/08/01
1,600 09/29/01
09/29/01
640
100
805 06 0856 / 7042
9863 S BEVERLY AVE
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 1636 / 7822
10246 S ELIZABETH ST
1.0
06/07/96
06/07/96
0 06/07/96
06/07/96
300
100
805 06 1644 / 7830
8241 S GREEN ST
1.0
08/29/97
08/29/97
0 08/29/97
08/29/97
300
100
302 00 0092 / 5774
8256 S HALSTED ST
1.0
0 12/10/01
12/10/01
236
100
300 06 0139 / 5289
9612 S HALSTED ST
2,279.0
03/01/06
09/01/06
52,018 04/01/06
04/16/06
68,858
100
805 06 1541 / 7727
9537 S LA SALLE ST
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 1810 / 7996
9211 S MAY ST
1.0
10/23/96
10/23/96
0 10/23/96
10/23/96
300
100
805 06 0597 / 6783
9424 S PARNELL AVE
1.0
01/09/96
01/09/96
0 01/09/96
01/09/96
300
100
805 06 0546 / 6732
9119 S PAULINA ST
1.0
01/15/96
01/15/96
0 01/15/96
01/15/96
300
100
805 06 0428 / 6614
8440 S THROOP ST
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 0367 / 6553
8005 S UNION AVE
1.0
11/08/96
11/08/96
0 11/08/96
11/08/96
300
100
805 06 1796 / 7982
8019 S UNION AVE
1.0
04/09/97
04/09/97
0 04/09/97
04/09/97
300
100
302 00 0092 / 5774
1125 W 95TH ST
0 01/16/01
01/24/02
9,426
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
9612 S HALSTED ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1125 W 95TH ST
Work Type: Flood Light Install
40.0 2,332.0
53,618
82,160
Lamps 2,069.0
06/01/07
12/31/07
60,911 11/15/07
01/11/08
59,069
100
0 08/15/02
09/01/02
35,378
100
Installations 1,943.0
Fixtures
300 06 0198 / 5323
LOWDEN HOMES
06/16/01
06/27/01
50,891 06/06/01
06/18/01
50,891
100
300 06 0071 / 5234
8223 S PRINCETON AVE
07/13/98
09/15/98
11,600 07/13/98
09/15/98
4,918
100
62,491
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
55,809
Blocks
281 00 / 32154
7600-7900 S THROOP ST
.0
12/08/06
12/31/06
0 12/08/06
12/31/06
0
0
300 06 0315 / 5421
201 W 95TH ST
.0
04/02/07
04/30/08
255,600 04/19/07
05/08/07
226,958
100
Totals per Lighting Imprvmnts
.0
255,600
226,958
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 223
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0122 / 5275
9450 S NORMAL AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
9612 S HALSTED ST
Work Type: Residntl Staggered Lighting
Installations 1.0
05/12/03
05/14/03
03/01/08
12/01/08
3,900 05/01/03
05/02/03
2,601
100
0
0
Lamps .0
0
Blocks
300 06 0308 / 5414
ON S ADA ST FROM W 81ST ST TO W 83RD ST
2.0
04/24/06
07/21/06
145,193 04/24/06
07/21/06
143,850
100
300 06 0298 / 5405
ON S LAFLIN ST FROM W 79TH ST TO W 81ST ST
2.0
09/01/05
10/15/05
0 08/02/05
12/19/05
124,705
100
300 06 / 32146
ON W 83RD ST FROM S DAMEN AVE TO S ASHLAND AVE
2.0
12/05/07
04/29/08
158,512
300 06 / 32275
8900-9100 S CARPENTER ST
2.0
04/01/07
12/31/07
162,645 04/05/07
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
8.0
07/02/07
466,350
0
50
96,306
100
364,861
Blocks
300 06 0253 / 5363
SIMEON CPS
08/01/03
08/29/03
135,000 07/18/03
10/31/03
125,667
100
300 06 0232 / 5346
ON S HERMITAGE AVE FROM W 87TH ST TO W 88TH ST
2.0
11/20/02
02/14/03
146,400 12/02/02
02/07/03
130,267
100
300 06 0267 / 5375
ON S LOWE AVE FROM W 88TH ST TO W 90TH ST
2.0
10/15/04
12/15/04
181,968 10/18/04
12/14/04
127,930
100
300 06 0235 / 5349
ON S MAY ST FROM W 89TH ST TO W 91ST ST
2.0
03/19/03
05/14/03
166,598 03/19/03
05/16/03
149,337
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 06 / 32021
7600-7900 S THROOP ST
Work Type: Short Arm Installs - Residntl
6.0
629,966
533,201
Installations .0
09/18/06
09/29/06
0 09/18/06
09/29/06
0
0
Locations
302 00 0092 / 5774
8100 S GREEN ST
1.0
0 05/24/01
05/24/01
378
100
302 00 0092 / 5774
8715 S WALLACE ST
1.0
0 06/15/01
06/15/01
378
100
2.0
0
756
2,312,612
2,295,956
Totals per Short Arm Installs - Residntl Totals per Lighting/Electrical
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 224
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 04 0216 / 5114
ON S ASHLAND AVE FROM W 93RD ST TO W 95TH ST
31.0
05/01/06
11/01/06
6,705 05/17/06
09/01/06
6,705
100
300 04 0216 / 5114
ON S VINCENNES AVE FROM W 79TH ST TO W 81ST ST
14.0
05/01/06
11/01/06
3,028 05/17/06
07/01/06
3,028
100
302 00 0076 / 5764
ON W 95TH ST FROM S BEVERLY AVE TO S WESTERN AVE
7.32
04/14/98
04/21/98
0 04/14/98
04/21/98
124
100
300 06 0108 / 5263
8800 S ABERDEEN ST
4.0
11/25/03
11/25/03
800 11/15/03
11/16/03
560
100
302 00 0076 / 5764
8000-8100 S LAFLIN ST
18.0
05/17/98
05/18/98
0 05/17/98
05/18/98
306
100
300 06 0108 / 5263
9200 S LAFLIN ST
4.0
11/25/03
11/25/03
1,000 11/15/03
11/16/03
560
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
78.32
11,533
11,283
Blocks
300 06 0264 / 5372
CUFFE CPS
1.0
0 07/15/03
08/15/03
19,603
100
300 06 0246 / 5356
ON S GENOA AVE FROM W 95TH ST TO W 96TH ST
1.0
08/01/04
10/01/04
102,084 09/07/04
06/14/05
86,479
100
300 06 0246 / 5356
ON S RACINE AVE FROM W 97TH PL TO W 98TH ST
.50
08/01/04
11/01/04
102,083 09/07/04
06/20/05
86,479
100
300 06 0246 / 5356
ON S SANGAMON ST FROM W 95TH ST TO W 94TH ST
1.0
08/01/04
11/01/04
102,083 09/07/04
12/04/04
86,479
100
300 06 0275 / 5383
ON W 88TH ST FROM S HARVARD AVE TO S HOLLAND RD
.75
85,000 08/29/05
01/10/06
54,822
100
300 06 0246 / 5356
ON W 92ND ST FROM S SANGAMON ST TO S PEORIA ST
.50
08/01/04
11/01/04
102,083 09/07/04
06/28/05
86,479
100
300 06 0246 / 5356
ON W 94TH ST FROM S SANGAMON ST TO S PEORIA ST
.50
08/01/04
11/01/04
102,083 09/07/04
12/04/04
86,479
100
300 06 0246 / 5356
ON W 96TH ST FROM S VINCENNES AVE TO S HALSTED ST
3.50
08/01/04
11/01/04
102,084 09/07/04
06/28/05
86,479
100
8.75
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
9612 S HALSTED ST
697,500
593,299
Lamps 1,705.0
03/01/04
12/01/04
8,866 07/31/06
08/16/06
18,567
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 225
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2258 / 8444
8501 S HALSTED ST
68.0
09/04/96
09/04/96
0 09/04/96
09/04/96
51,000
100
805 06 2945 / 9131
8699 S HOLLAND RD
20.0
12/28/93
12/28/93
0 12/28/93
12/28/93
15,000
100
805 06 2944 / 9130
8901 S MORGAN ST
4.0
12/21/93
12/21/93
0 12/21/93
12/21/93
3,000
100
805 06 2236 / 8422
9022 S STATE ST
16.0
05/09/96
05/09/96
0 05/09/96
05/09/96
12,000
100
805 06 2237 / 8423
9022 S STATE ST
8.0
05/09/96
05/09/96
0 05/09/96
05/09/96
6,000
100
805 06 2238 / 8424
9022 S STATE ST
11.0
05/09/96
05/09/96
0 05/09/96
05/09/96
8,250
100
805 06 2218 / 8404
8301 S VINCENNES AVE
78.0
12/18/96
12/18/96
0 12/18/96
12/18/96
58,500
100
302 00 0072 / 5760
8320 S VINCENNES AVE
1.0
0 05/01/00
05/03/00
8,748
100
805 06 2222 / 8408
8698 S VINCENNES AVE
34.0
12/09/96
12/09/96
0 12/09/96
12/09/96
25,500
100
805 06 2942 / 9128
8899 S VINCENNES AVE
18.0
03/20/94
03/20/94
0 03/20/94
03/20/94
13,500
100
805 06 2889 / 9075
625 W 80TH ST
18.0
03/04/94
03/04/94
0 03/04/94
03/04/94
13,500
100
805 06 2097 / 8283
695 W 81ST ST
16.0
02/17/93
02/17/93
0 02/17/93
02/17/93
12,000
100
805 06 2221 / 8407
285 W 87TH ST
24.0
04/27/93
04/27/93
0 04/27/93
04/27/93
18,000
100
805 06 2220 / 8406
335 W 87TH ST
20.0
04/22/93
04/22/93
0 04/22/93
04/22/93
15,000
100
805 06 2946 / 9132
335 W 88TH ST
8.0
12/21/93
12/21/93
0 12/21/93
12/21/93
6,000
100
300 06 0217 / 5337
1125 W 95TH ST
307.0
04/13/04
04/16/04
17,256 12/09/03
12/11/03
12,923
100
Totals per Underpass Lighting
651.0
17,256
278,921
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 226
1/1/2008 AND 12/31/2008
Ward 21 Howard B Brookins, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
S ASHLAND AVE AND W 83RD ST
.50
05/04/05
05/04/05
5,327 05/06/05
05/06/05
0
100
210 06 0219 / 4459
S ASHLAND AVE AND W 87TH ST
1.0
05/03/05
05/03/05
10,653 05/05/04
05/04/05
0
100
Totals per LED Signal Head Install
Work Type: New Signal 300 06 0283 / 5391
S HALSTED ST AND W 91ST ST
Work Type: Pedestrian Countdown Signal Install
1.50
15,980
0
Locations 1.0
09/02/04
09/30/04
9,293 09/09/04
09/09/04
9,293
100
Locations
210 06 0243 / 4480
W 95TH ST AND S LAFAYETTE AVE
03/27/06
12/27/08
12,000
0
0
210 06 0243 / 4480
Showing jcs funding for drafting dept. only. job not yet issued Note Last Updated on 29-JAN-08 W 98TH PL AND S HALSTED ST .0 04/01/06
04/01/07
0
0
0
12,000
0
Totals per Pedestrian Countdown Signal Install
Work Type: Signals 300 06 0096 / 5258
9245 S ASHLAND AVE
Work Type: TSM Install
.0
.0
Intersections 51.0
08/08/03
08/12/03
0 08/03/03
08/10/03
8,064
100
Locations
814 06 0063 / 16279
9100 S HALSTED ST
1.0
02/21/96
02/21/96
0 02/21/96
02/21/96
112,063
100
814 06 0375 / 16565
9099 S VINCENNES AVE
1.0
02/28/96
02/28/96
0 02/28/96
02/28/96
75,026
100
814 06 0166 / 16378
8700 S WALLACE ST
1.0
08/28/97
12/11/97
0 08/28/97
12/11/97
200,000
100
271 00 0039 / 4788
8700 S WOOD ST
1.0
0 07/20/98
09/30/98
15,000
814 06 0248 / 16460
140 W 87TH ST
1.0
0 12/29/89
12/29/89
84,322
Totals per TSM Install
5.0
12/29/89
12/29/89
0
486,411
37,273
503,768
Totals per Construction Phase
2,349,885
2,799,724
Totals for Ward 21
2,371,435
2,823,323
Totals per Traffic
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 227
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
3,137
100
210 06 0023 / 4298
W 26TH ST AND S KEELER AVE
.0
02/06/02
04/02/02
0 02/06/02
04/02/02
0
0
Totals per Design/Engineering
.0
0
3,137
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 228
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 03 0012 / 4883
ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE
300 03 0022 / 4893
2500 S ST LOUIS AVE
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
Fixtures .30
10/01/04
10/10/04
117 10/08/04
10/19/04
67
100
1,010.0
07/18/04
08/11/04
400,750 07/23/04
10/07/04
226,080
100
1,010.30
400,867
226,147
Fixtures
300 06 0225 / 5340
MCCORMICK SCHOOL CPS
31.0
08/16/04
08/27/04
12,707 08/16/04
08/27/04
9,193
100
300 06 0251 / 5361
MCCORMICK SCHOOL CPS
4.0
08/16/04
08/27/04
1,693 08/16/04
08/27/04
1,694
100
300 05 0022 / 5137
ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE
37.0
04/04/05
11/18/05
14,800 07/28/05
08/01/05
12,950
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
72.0
29,200
23,837
1,715,181
1,493,305
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 229
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0826 / 7012
2520 S AVERS AVE
1.0
04/23/96
04/23/96
0 04/23/96
04/23/96
300
100
805 06 0844 / 7030
3133 S AVERS AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
805 06 0814 / 7000
2444 S CENTRAL PARK AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
805 06 1930 / 8116
2502 S CHRISTIANA AVE
1.0
03/29/96
03/29/96
0 03/29/96
03/29/96
300
100
805 06 1714 / 7900
2840 S CHRISTIANA AVE
1.0
06/18/97
06/18/97
0 06/18/97
06/18/97
300
100
805 06 0742 / 6928
2637 S DRAKE AVE
1.0
03/29/96
03/29/96
0 03/29/96
03/29/96
300
100
805 06 1080 / 7266
2522 S HAMLIN AVE
1.0
06/26/96
06/26/96
0 06/26/96
06/26/96
300
100
805 06 1053 / 7239
2536 S HAMLIN AVE
1.0
06/26/96
06/26/96
0 06/26/96
06/26/96
300
100
805 06 1163 / 7349
2430 S KEDZIE AVE
1.0
04/18/96
04/18/96
0 04/18/96
04/18/96
300
100
805 06 1170 / 7356
2818 S KEELER AVE
1.0
03/27/96
03/27/96
0 03/27/96
03/27/96
300
100
805 06 1565 / 7751
2652 S KOLIN AVE
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
805 06 1713 / 7899
2722 S LAWNDALE AVE
1.0
06/18/97
06/18/97
0 06/18/97
06/18/97
300
100
805 06 1548 / 7734
3221 S LAWNDALE AVE
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 0568 / 6754
3231 S PULASKI RD
1.0
01/24/96
01/24/96
0 01/24/96
01/24/96
300
100
805 06 1463 / 7649
3211 S SPRINGFIELD AVE
1.0
12/03/97
12/03/97
0 12/03/97
12/03/97
300
100
300 06 0139 / 5289
2500 S ST LOUIS AVE
1,162.0
03/01/06
09/01/06
25,405 04/01/06
04/15/06
35,109
100
302 00 0092 / 5774
2500 S ST LOUIS AVE
8.0
0 01/18/01
01/04/02
1,885
100
805 06 0954 / 7140
3924 W 24TH ST
1.0
0 03/22/95
03/22/95
300
100
302 00 0092 / 5774
3926 W 24TH ST
1.0
0 10/23/01
10/23/01
236
100
805 06 1733 / 7919
4008 W 26TH ST
1.0
0 06/05/97
06/05/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
2512 S ST LOUIS AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2500 S ST LOUIS AVE
Work Type: Flood Light Install 300 06 0167 / 5306
2643 S CENTRAL PARK AVE
03/22/95
06/05/97
03/22/95
06/05/97
1,188.0
25,405
42,330
Lamps 1,231.0
06/01/07
12/31/07
36,240 09/01/07
10/01/07
35,145
100
0 06/04/02
06/07/02
19,956
100
0 01/09/99
01/09/99
702
100
Installations 1,096.0
Fixtures 2.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 230
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0078 / 5241
ON S PULASKI RD FROM W 25TH ST TO W 27TH ST
Work Type: Ornamental - Piggyback Lighting
Blocks 1.0
04/01/98
12/01/98
12,500 01/28/99
07/16/99
20,660
100
Fixtures
300 03 0022 / 4893
ON S KOLIN AVE FROM W 26TH ST TO W 27TH ST
10.0
05/06/04
05/06/04
13,500 05/06/04
05/11/04
1,443
100
300 06 0122 / 5275
ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD
44.0
12/10/03
12/25/03
52,800 12/08/03
12/12/03
51,509
100
300 06 0069 / 5233
ON W 26TH ST FROM S KOSTNER AVE TO S KOLIN AVE
58.0
12/20/02
01/09/03
72,500 12/28/02
02/28/03
70,097
100
300 06 0069 / 5233
ON W 26TH ST FROM S PULASKI RD TO S KEDZIE AVE
29.0
12/20/02
01/09/03
36,250 12/28/02
02/28/03
35,049
100
300 05 0022 / 5137
ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE
26.0
04/04/05
11/18/05
35,100 07/28/05
08/01/05
36,510
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
2500 S ST LOUIS AVE
Work Type: Residntl Staggered Lighting
167.0
210,150
194,608
0
0
0
Lamps .0
03/01/08
12/01/08
Blocks
300 06 0308 / 5414
ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST
2.0
03/22/06
05/01/06
197,681 03/22/06
05/17/06
160,213
100
300 07 0022 / 5445
ON S CENTRAL PARK AVE FROM W 26TH ST TO W 28TH ST
2.0
03/16/06
05/17/06
50,000 03/16/06
05/17/06
50,000
100
300 09 / 33088
ON S CENTRAL PARK AVE FROM W 26TH ST TO W CERMAK RD
4.0
30,000 04/01/08
12/01/08
0
0
300 06 0298 / 5405
ON S LAWNDALE AVE FROM W 24TH ST TO W 25TH ST
2.0
0 05/08/05
07/08/05
127,917
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
06/25/05
07/25/05
10.0
277,681
338,130
Blocks
300 06 0267 / 5375
ON S LAWNDALE AVE FROM W 26TH ST TO W 27TH ST
2.0
08/01/04
10/01/04
215,545 08/16/04
10/06/04
155,750
100
300 06 0235 / 5349
ON S LAWNDALE AVE FROM W 28TH ST TO W 30TH ST
2.0
08/15/03
10/15/03
163,727 07/23/03
10/01/03
139,874
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
2735 S KOLIN AVE
4.0
379,272
295,624
Locations 1.0
0 03/01/01
03/01/01
378
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 231
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0225 / 5340
MCCORMICK SCHOOL CPS
35.0
300 06 0108 / 5263
ON W 26TH ST FROM S KOLIN AVE TO S PULASKI RD
42.0
300 05 0022 / 5137
ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE
97.0
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
04/04/05
08/27/04
11/18/05
174.0
ON S KOSTNER AVE FROM W 31ST ST TO W 33RD ST
2.0
300 06 0247 / 5357
ON W 30TH ST FROM S KILBOURN AVE TO S KOSTNER AVE
2.0
Work Type: Traffic Signal Regrouping 2500 S ST LOUIS AVE
Work Type: Underpass Lighting
08/27/04
7,776
100
10/30/03
10,360
100
24,250 07/25/05
08/08/05
19,251
100
45,500
04/28/03
06/30/03
4.0
Totals per Strt Lighting
8,750 08/16/04 12,500 10/10/03
37,387
Blocks
300 06 0246 / 5356
300 06 0139 / 5289
08/16/04
188,250 05/22/05
09/02/05
86,189
100
100,000 04/22/03
07/07/03
99,166
100
288,250
185,355
Lamps 951.0
03/01/04
12/01/04
4,945 07/31/06
09/21/06
10,356
100
Fixtures
805 06 2198 / 8384
3100 S KEDZIE AVE
6.0
03/10/94
03/10/94
0 03/10/94
03/10/94
4,500
100
805 06 2621 / 8807
2399 S KEELER AVE
10.0
04/29/93
04/29/93
0 04/29/93
04/29/93
7,500
100
805 06 2422 / 8608
2495 S KOSTNER AVE
12.0
12/14/95
12/14/95
0 12/14/95
12/14/95
9,000
100
805 06 2620 / 8806
2395 S PULASKI RD
12.0
02/01/95
02/01/95
0 02/01/95
02/01/95
9,000
100
300 06 0217 / 5337
2600 S ST LOUIS AVE
92.0
03/12/04
03/16/04
5,171 12/12/03
12/12/03
4,190
100
805 06 2948 / 9134
4405 W 26TH ST
8.0
01/05/94
01/05/94
0 01/05/94
01/05/94
6,000
100
805 06 2348 / 8534
4501 W CERMAK RD
16.0
03/09/93
03/09/93
0 03/09/93
03/09/93
12,000
100
805 06 2955 / 9141
4400 W OGDEN AVE
14.0
12/12/95
12/12/95
0 12/12/95
12/12/95
10,500
100
Totals per Underpass Lighting
170.0
5,171
62,690
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 232
1/1/2008 AND 12/31/2008
Ward 22 Ricardo Munoz CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals
Crossings
300 06 0197 / 5322
S CENTRAL PARK AVE AND W 25TH ST
3.0
12,000 06/26/01
04/08/02
209
100
300 06 0197 / 5322
W 28TH ST AND S KEDZIE AVE
.50
2,000 06/19/01
08/01/01
153
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
2500 S ST LOUIS AVE
Work Type: TSM Install
3.50
14,000
362
Intersections 28.0
09/28/03
10/07/03
0 09/02/03
09/09/03
4,427
100
Locations
210 06 0020 / 4295
S HAMLIN AVE AND W 26TH ST
02/01/00
03/15/00
150,000 12/09/99
02/14/00
105,000
100
210 06 0022 / 4297
W 25TH ST AND S CENTRAL PARK AVE
1.0
11/07/02
04/15/03
178,000 11/01/02
01/31/03
110,835
100
210 06 0023 / 4298
W 26TH ST AND S KEELER AVE
1.0
08/25/03
11/15/03
170,700 08/22/03
10/10/03
132,551
100
814 06 0113 / 16328
3100 S HAMLIN AVE
1.0
04/29/93
04/29/93
0 04/29/93
04/29/93
83,958
100
271 00 0045 / 4794
2500 S PULASKI RD
1.0
125,660 08/01/97
08/15/99
125,660
100
814 06 0256 / 16468
2800 S PULASKI RD
1.0
0 08/17/89
08/17/89
74,970
100
08/17/89
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 05 0022 / 5137
08/17/89
ON W OGDEN AVE FROM S PULASKI RD TO S KENTON AVE
Totals per Traffic
624,360
632,974
Locations 14.0
04/04/05
11/18/05
5,650 07/25/05
08/08/05
5,191
644,010
642,954
Totals per Construction Phase
2,359,191
2,136,259
Totals for Ward 22
2,359,191
2,139,396
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 233
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32969
ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST
.0
10/17/07
11/30/07
0
0
0
300 06 0308 / 5414
ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,336
100
300 06 0308 / 5414
ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,336
100
300 06 / 32277
ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST
.0
04/01/08
08/30/08
0
0
0
300 06 / 32277
ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE
.0
04/01/08
08/30/08
0
0
0
300 06 / 32146
ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE
.0
05/01/07
10/31/07
3,756
100
300 06 / 32146
ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE
.0
05/01/07
10/31/07
0
100
210 06 0127 / 4386
W 55TH ST AND S KILBOURN AVE
.50
11/01/06
11/20/06
2,500 01/17/07
210 06 0187 / 4432
W 63RD ST AND S LATROBE AVE
.50
11/15/03
02/15/04
0 11/15/03
300 06 0292 / 5399
5000 W 55TH ST
1.0
01/11/05
01/20/05
1,500 01/11/05
Totals per Design/Engineering
2.0
3,900 06/21/07
07/19/07
0
7,900
1,593
15
02/15/04
2,063
100
01/20/05
615
100
10,699
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 234
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON S LEAMINGTON AVE FROM W 46TH ST TO W 48TH ST
10.0
10/18/02
10/18/02
4,000 10/15/02
10/15/02
3,750
100
300 11 / 32212
ON S MCVICKER AVE FROM W 51ST ST TO W 52ND ST
5.0
01/11/08
01/04/08
2,200 01/04/08
01/04/08
1,545
100
300 03 0023 / 4894
ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST
57.0
07/01/04
08/01/04
21,375 06/14/04
07/28/04
13,768
100
300 03 0023 / 4894
ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST
56.0
07/01/04
08/01/04
21,000 06/14/04
07/28/04
13,526
100
300 03 0023 / 4894
ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST
54.0
07/01/04
08/01/04
20,250 06/14/04
07/28/04
13,042
100
300 03 0023 / 4894
ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST
57.0
07/01/04
08/01/04
21,375 06/14/04
07/28/04
13,768
100
300 03 0023 / 4894
ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST
34.0
07/01/04
08/01/04
12,750 06/14/04
07/28/04
8,212
100
300 03 0023 / 4894
ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
6,375 06/14/04
07/28/04
4,107
100
300 03 0023 / 4894
ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
18.0
07/01/04
08/01/04
6,750 06/14/04
07/28/04
4,347
100
300 03 0023 / 4894
ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
6,375 06/14/04
07/28/04
4,107
100
300 03 0023 / 4894
ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
6,375 06/14/04
07/28/04
4,107
100
300 03 0023 / 4894
ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
6,375 06/14/04
07/28/04
4,107
100
300 03 0023 / 4894
ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
15.0
07/01/04
08/01/04
5,625 06/14/04
07/28/04
3,623
100
300 03 0023 / 4894
ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
16.0
07/01/04
08/01/04
6,000 06/14/04
07/28/04
3,865
100
300 03 0023 / 4894
ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
13.0
07/01/04
08/01/04
4,875 06/14/04
07/28/04
3,141
100
300 03 0023 / 4894
ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
23.0
07/01/04
08/01/04
8,625 06/14/04
07/28/04
5,659
100
300 03 0023 / 4894
ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE
28.0
07/01/04
08/01/04
10,500 06/14/04
07/28/04
6,762
100
300 03 0023 / 4894
ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
28.0
07/01/04
08/01/04
10,500 06/14/04
07/28/04
6,762
100
302 00 0092 / 5774
S MERRIMAC AVE AND W 62ND ST
1.0
10/04/01
10/05/01
205 10/05/01
10/09/01
205
100
300 06 0069 / 5233
5300 S KEATING AVE
5.0
1,875 09/25/02
09/25/02
1,875
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
488.0
183,405
120,278
Fixtures
300 09 / 33089
ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST
41.0
09/29/08
10/03/08
16,400 09/29/08
10/03/08
13,602
100
300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
14.85
12/01/07
01/01/08
5,940 11/28/07
02/15/08
5,297
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
11.25
05/27/08
06/05/08
4,500 09/22/08
10/24/08
4,500
100
300 06 0069 / 5233
ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE
6.50
2,600 02/21/02
02/21/02
2,600
100
302 00 0092 / 5774
ON W 47TH ST FROM S PULASKI RD TO S KEELER AVE
6.50
02/24/02
02/24/02
2,600 02/21/02
02/21/02
2,438
100
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
47.52
05/10/04
06/10/04
19,008 05/01/04
05/11/04
18,321
100
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
47.75
05/01/04
05/15/04
19,100 05/10/04
05/16/04
6,785
100
Totals per 400 Watt Changeout
175.37
70,148
53,543
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 235
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0714 / 6900
5102 S ARCHER AVE
1.0
12/11/96
12/11/96
0 12/11/96
12/11/96
300
100
805 06 0715 / 6901
5129 S ARCHER AVE
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
805 06 0717 / 6903
5151 S ARCHER AVE
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
805 06 0707 / 6893
5155 S ARCHER AVE
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
300 06 0139 / 5289
5838 S ARCHER AVE
2,400.0
03/01/06
09/01/06
54,637 06/26/06
07/14/06
72,514
100
302 00 0092 / 5774
5838 S ARCHER AVE
27.0
0 01/18/01
12/18/01
6,363
100
805 06 0865 / 7051
5433 S AUSTIN AVE
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 0770 / 6956
6054 S AUSTIN AVE
1.0
01/20/95
01/20/95
0 01/20/95
01/20/95
300
100
805 06 0864 / 7050
5426 S AVERS AVE
1.0
10/03/95
10/03/95
0 10/03/95
10/03/95
300
100
805 06 0378 / 6564
4620 S CICERO AVE
1.0
01/09/96
01/09/96
0 01/09/96
01/09/96
300
100
805 06 1355 / 7541
4906 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1446 / 7632
4922 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1347 / 7533
4936 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1328 / 7514
4958 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1310 / 7496
5022 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1291 / 7477
5040 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1302 / 7488
5050 S KEATING AVE
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 1200 / 7386
5129 S KENNETH AVE
1.0
07/20/95
07/20/95
0 07/20/95
07/20/95
300
100
805 06 1171 / 7357
5201 S KENNETH AVE
1.0
07/20/95
07/20/95
0 07/20/95
07/20/95
300
100
805 06 1172 / 7358
5221 S KENNETH AVE
1.0
07/20/95
07/20/95
0 07/20/95
07/20/95
300
100
805 06 1173 / 7359
5259 S KENNETH AVE
1.0
07/20/95
07/20/95
0 07/20/95
07/20/95
300
100
805 06 1021 / 7207
4901 S KILBOURN AVE
1.0
06/16/95
06/16/95
0 06/16/95
06/16/95
300
100
805 06 1479 / 7665
5420 S KILBOURN AVE
1.0
11/25/97
11/25/97
0 11/25/97
11/25/97
300
100
805 06 2032 / 8218
5141 S KILDARE AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 2016 / 8202
5203 S KILDARE AVE
1.0
08/11/95
08/11/95
0 08/11/95
08/11/95
300
100
805 06 2055 / 8241
4822 S KILPATRICK AVE
1.0
09/21/95
09/21/95
0 09/21/95
09/21/95
300
100
805 06 2036 / 8222
4840 S KILPATRICK AVE
1.0
09/21/95
09/21/95
0 09/21/95
09/21/95
300
100
805 06 2037 / 8223
4858 S KILPATRICK AVE
1.0
09/21/95
09/21/95
0 09/21/95
09/21/95
300
100
805 06 2038 / 8224
4940 S KILPATRICK AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 2039 / 8225
5022 S KILPATRICK AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 2011 / 8197
5040 S KILPATRICK AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 236
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 2047 / 8233
4401 S KNOX AVE
1.0
04/26/95
04/26/95
0 04/26/95
04/26/95
300
100
805 06 2049 / 8235
4518 S KNOX AVE
1.0
06/13/95
06/13/95
0 06/13/95
06/13/95
300
100
805 06 2050 / 8236
4822 S KNOX AVE
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 2051 / 8237
4825 S KNOX AVE
1.0
01/11/96
01/11/96
0 01/11/96
01/11/96
300
100
805 06 2052 / 8238
4836 S KNOX AVE
1.0
08/22/95
08/22/95
0 08/22/95
08/22/95
300
100
805 06 1639 / 7825
4843 S KNOX AVE
1.0
08/26/97
08/26/97
0 08/26/97
08/26/97
300
100
805 06 1640 / 7826
4855 S KNOX AVE
1.0
08/26/97
08/26/97
0 08/26/97
08/26/97
300
100
805 06 2019 / 8205
4858 S KNOX AVE
1.0
08/22/95
08/22/95
0 08/22/95
08/22/95
300
100
805 06 2065 / 8251
4859 S KNOX AVE
1.0
01/11/96
01/11/96
0 01/11/96
01/11/96
300
100
805 06 2035 / 8221
4905 S KNOX AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 2010 / 8196
4921 S KNOX AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 1981 / 8167
4922 S KNOX AVE
1.0
08/22/95
08/22/95
0 08/22/95
08/22/95
300
100
805 06 1982 / 8168
4940 S KNOX AVE
1.0
09/07/95
09/07/95
0 09/07/95
09/07/95
300
100
805 06 1984 / 8170
4941 S KNOX AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 1985 / 8171
4958 S KNOX AVE
1.0
09/07/95
09/07/95
0 09/07/95
09/07/95
300
100
805 06 1986 / 8172
4959 S KNOX AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 1971 / 8157
5005 S KNOX AVE
1.0
09/12/95
09/12/95
0 09/12/95
09/12/95
300
100
805 06 1988 / 8174
5019 S KNOX AVE
1.0
09/07/95
09/07/95
0 09/07/95
09/07/95
300
100
805 06 2009 / 8195
5022 S KNOX AVE
1.0
09/07/95
09/07/95
0 09/07/95
09/07/95
300
100
805 06 1990 / 8176
5040 S KNOX AVE
1.0
09/07/95
09/07/95
0 09/07/95
09/07/95
300
100
805 06 1991 / 8177
5041 S KNOX AVE
1.0
09/06/95
09/06/95
0 09/06/95
09/06/95
300
100
805 06 1992 / 8178
5051 S KNOX AVE
1.0
09/06/95
09/06/95
0 09/06/95
09/06/95
300
100
805 06 2018 / 8204
5111 S KOLIN AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 1966 / 8152
5119 S KOLIN AVE
1.0
07/21/95
07/21/95
0 07/21/95
07/21/95
300
100
805 06 1967 / 8153
5122 S KOLIN AVE
1.0
07/21/95
07/21/95
0 07/21/95
07/21/95
300
100
805 06 1968 / 8154
5142 S KOLIN AVE
1.0
07/21/95
07/21/95
0 07/21/95
07/21/95
300
100
805 06 1969 / 8155
5201 S KOLIN AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 1970 / 8156
5225 S KOLIN AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 1989 / 8175
5238 S KOLIN AVE
1.0
07/25/95
07/25/95
0 07/25/95
07/25/95
300
100
805 06 0352 / 6538
5119 S LEAMINGTON AVE
1.0
11/15/96
11/15/96
0 11/15/96
11/15/96
300
100
805 06 0355 / 6541
4517 S LECLAIRE AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 237
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0339 / 6525
4537 S LECLAIRE AVE
1.0
01/12/96
01/12/96
0 01/12/96
01/12/96
300
100
805 06 1880 / 8066
5719 S MASON AVE
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 1851 / 8037
5742 S MASON AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 1826 / 8012
5758 S MASON AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 1811 / 7997
5720 S MAYFIELD AVE
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 1813 / 7999
5740 S MAYFIELD AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 1814 / 8000
5758 S MAYFIELD AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 1815 / 8001
5819 S MAYFIELD AVE
1.0
09/27/95
09/27/95
0 09/27/95
09/27/95
300
100
805 06 1805 / 7991
5841 S MAYFIELD AVE
1.0
09/27/95
09/27/95
0 09/27/95
09/27/95
300
100
805 06 1843 / 8029
5844 S MAYFIELD AVE
1.0
09/26/95
09/26/95
0 09/26/95
09/26/95
300
100
302 00 0092 / 5774
5318 S MC VICKER AVE
1.0
0 09/10/01
09/10/01
236
100
805 06 1785 / 7971
5425 S MC VICKER AVE
1.0
05/01/97
05/01/97
0 05/01/97
05/01/97
300
100
805 06 1833 / 8019
6004 S MC VICKER AVE
1.0
03/24/95
03/24/95
0 03/24/95
03/24/95
300
100
805 06 1844 / 8030
6018 S MC VICKER AVE
1.0
03/16/95
03/16/95
0 03/16/95
03/16/95
300
100
805 06 1845 / 8031
6040 S MC VICKER AVE
1.0
02/08/95
02/08/95
0 02/08/95
02/08/95
300
100
805 06 1649 / 7835
5532 S MELVINA AVE
1.0
09/10/97
09/10/97
0 09/10/97
09/10/97
300
100
805 06 1654 / 7840
5655 S MELVINA AVE
1.0
07/30/97
07/30/97
0 07/30/97
07/30/97
300
100
805 06 1513 / 7699
5658 S MELVINA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
302 00 0092 / 5774
5240 S NAGLE AVE
1.0
0 10/01/01
10/01/01
0
100
805 06 1901 / 8087
5336 S NARRAGANSETT AVE
1.0
01/24/95
01/24/95
0 01/24/95
01/24/95
300
100
805 06 1902 / 8088
5540 S NARRAGANSETT AVE
1.0
08/31/95
08/31/95
0 08/31/95
08/31/95
300
100
805 06 1904 / 8090
5626 S NASHVILLE AVE
1.0
01/03/97
01/03/97
0 01/03/97
01/03/97
300
100
805 06 1905 / 8091
6222 S NASHVILLE AVE
1.0
07/19/95
07/19/95
0 07/19/95
07/19/95
300
100
805 06 1876 / 8062
6223 S NASHVILLE AVE
1.0
06/13/95
06/13/95
0 06/13/95
06/13/95
300
100
805 06 1474 / 7660
5736 S NATOMA AVE
1.0
11/17/97
11/17/97
0 11/17/97
11/17/97
300
100
805 06 1935 / 8121
5220 S NEENAH AVE
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 1926 / 8112
5827 S NEENAH AVE
1.0
01/19/95
01/19/95
0 01/19/95
01/19/95
300
100
805 06 1647 / 7833
5837 S NEVA AVE
1.0
09/08/97
09/08/97
0 09/08/97
09/08/97
300
100
805 06 1934 / 8120
5617 S NEWCASTLE AVE
1.0
01/11/96
01/11/96
0 01/11/96
01/11/96
300
100
805 06 1768 / 7954
5726 S NEWLAND AVE
1.0
05/14/97
05/14/97
0 05/14/97
05/14/97
300
100
805 06 1908 / 8094
5446 S NORDICA AVE
1.0
05/16/96
05/16/96
0 05/16/96
05/16/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 238
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1673 / 7859
6019 S NORMANDY AVE
1.0
07/24/97
07/24/97
0 07/24/97
07/24/97
300
100
805 06 0594 / 6780
5429 S NOTTINGHAM AVE
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 0578 / 6764
5607 S NOTTINGHAM AVE
1.0
07/18/96
07/18/96
0 07/18/96
07/18/96
300
100
805 06 0668 / 6854
5322 S RIDGEWAY AVE
1.0
01/23/95
01/23/95
0 01/23/95
01/23/95
300
100
805 06 0412 / 6598
5117 S TRIPP AVE
1.0
07/27/95
07/27/95
0 07/27/95
07/27/95
300
100
805 06 0388 / 6574
5229 S TRIPP AVE
1.0
07/27/95
07/27/95
0 07/27/95
07/27/95
300
100
805 06 0390 / 6576
5231 S TRIPP AVE
1.0
07/27/95
07/27/95
0 07/27/95
07/27/95
300
100
805 06 0927 / 7113
4700 W 47TH ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 1022 / 7208
4634 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
805 06 1023 / 7209
4658 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
805 06 1025 / 7211
4707 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
805 06 1026 / 7212
4724 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
805 06 1010 / 7196
4736 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
805 06 1028 / 7214
4742 W 51ST ST
1.0
09/22/95
09/22/95
0 09/22/95
09/22/95
300
100
302 00 0092 / 5774
5039 W 52ND ST
1.0
0 01/23/01
01/23/01
236
100
805 06 1624 / 7810
7151 W 54TH ST
1.0
09/12/97
09/12/97
0 09/12/97
09/12/97
300
100
805 06 1007 / 7193
5858 W 59TH ST
1.0
07/13/95
07/13/95
0 07/13/95
07/13/95
300
100
805 06 1008 / 7194
5900 W 59TH ST
1.0
09/26/95
09/26/95
0 09/26/95
09/26/95
300
100
805 06 1041 / 7227
6618 W 63RD PL
1.0
07/03/96
07/03/96
0 07/03/96
07/03/96
300
100
805 06 1013 / 7199
6301 W 63RD ST
1.0
04/13/95
04/13/95
0 04/13/95
04/13/95
300
100
805 06 1059 / 7245
6325 W 63RD ST
1.0
03/12/96
03/12/96
0 03/12/96
03/12/96
300
100
805 06 0977 / 7163
6541 W 64TH PL
1.0
01/17/96
01/17/96
0 01/17/96
01/17/96
300
100
805 06 0979 / 7165
6930 W 64TH PL
1.0
02/28/95
02/28/95
0 02/28/95
02/28/95
300
100
805 06 1782 / 7968
6415 W 64TH ST
1.0
04/29/97
04/29/97
0 04/29/97
04/29/97
300
100
805 06 1641 / 7827
6540 W 64TH ST
1.0
08/27/97
08/27/97
0 08/27/97
08/27/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
6247 S ARCHER AVE
Totals per Lighting/Electrical
2,543.0
54,637
113,249
Lamps 1,579.0
06/01/07
12/31/07
46,485 12/18/07 2,942,011
12/27/07
45,080 1,665,008
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 239
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 09 / 33089
4653 S LAWLER AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5838 S ARCHER AVE
Work Type: Flood Light Install
Blocks 1.0
04/01/08
12/01/08
6,000 04/01/08
12/01/08
12,503
100
0 07/08/02
07/11/02
27,021
100
Installations 1,484.0
Fixtures
300 06 0198 / 5323
LE CLAIRE COURTS
05/24/01
06/05/01
77,530 05/14/01
05/26/01
79,082
100
300 09 / 33089
ON S MCVICKER AVE FROM W 52ND ST TO W 53RD ST
4.0
10/02/08
10/03/08
2,000 10/02/08
10/03/08
1,017
100
300 07 0023 / 5446
ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST
7.0
04/18/06
11/18/06
3,500
300 11 / 32212
ON S NATOMA AVE FROM W 61ST ST TO W 62ND ST
7.0
02/12/07
02/12/07
3,500 02/12/07
300 09 / 33089
ON S NEVA AVE FROM W 52ND ST TO W 53RD ST
6.0
07/11/08
07/11/08
302 00 0092 / 5774
W 48TH ST AND S LARAMIE AVE
3.0
302 00 0092 / 5774
6200 S AUSTIN AVE
302 00 0092 / 5774
0
0
02/12/07
3,500
100
3,000 07/11/08
07/11/08
2,000
100
0 07/21/01
07/21/01
1,412
100
2.0
0 10/18/01
10/18/01
807
100
4800 S LEAMINGTON AVE
5.0
0 07/27/01
07/27/01
2,353
100
302 00 0092 / 5774
6200 S MERRIMAC AVE
1.0
0 10/05/01
10/05/01
345
100
302 00 0092 / 5774
5330 S NATOMA AVE
2.0
0 10/18/01
10/18/01
807
100
302 00 0092 / 5774
6400 S NEW ENGLAND AVE
2.0
0 10/11/01
10/11/01
807
100
302 00 0092 / 5774
5140 W 48TH ST
1.0
0 07/21/01
07/21/01
471
100
302 00 0092 / 5774
5140 W 49TH ST
2.0
0 07/27/01
07/27/01
941
100
300 09 / 33089
6939 W 59TH ST
2.0
1,000 07/11/08
07/11/08
850
100
302 00 0092 / 5774
6949 W 63RD PL
1.0
0 10/11/01
10/11/01
0
100
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting
07/11/08
07/11/08
45.0
90,530
94,392
Fixtures
300 09 / 33089
ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST
35.0
10/20/08
11/05/08
47,250 10/20/08
11/05/08
46,057
100
300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
14.19
12/01/07
01/01/08
19,157 11/28/07
02/15/08
17,028
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
11.25
07/28/08
08/08/08
15,188 09/22/08
10/24/08
11,789
100
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
5.0
05/01/04
05/15/04
6,750 05/10/04
05/21/04
7,216
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
6247 S ARCHER AVE
65.44
88,344
82,090
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 240
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 11 / 32212
ON S AUSTIN AVE FROM W 51ST ST TO S ARCHER AVE
3.0
11/15/07
02/15/08
170,000
300 07 0023 / 5446
meade elec. Note Last Updated on 05-FEB-08 ON S KOSTNER AVE FROM W 47TH ST TO W 49TH ST
2.0
06/19/06
08/18/06
170,000 07/10/06
300 05 0023 / 5138
ON S KOSTNER AVE FROM W 55TH ST TO S ARCHER AVE
4.0
04/04/05
11/18/05
340,000 07/25/05
300 06 0308 / 5414
ON S LATROBE AVE FROM W 54TH ST TO W 55TH ST
1.0
04/17/06
06/19/06
300 06 0308 / 5414
ON S LOCKWOOD AVE FROM W 54TH ST TO W 55TH ST
1.0
04/17/06
06/19/06
300 06 / 32277
ON S MAJOR AVE FROM W 51ST ST TO W 53RD ST
.0
05/04/08
12/31/08
300 05 0014 / 5129
ON W 51ST ST FROM S HARDING AVE TO S LAWNDALE AVE
2.0
04/04/05
11/18/05
300 06 / 32277
ON W 53RD ST FROM S MASSASOIT AVE TO S PARKSIDE AVE
.0
05/04/08
12/31/08
300 07 0014 / 5437
ON W 55TH PL FROM S LAWNDALE AVE TO S HAMLIN AVE
.0
03/01/06
12/31/06
300 06 / 32146
ON W 63RD PL FROM S SAYRE AVE TO S OAK PARK AVE
2.0
12/05/07
300 06 / 32146
ON W 64TH ST FROM S SAYRE AVE TO S OAK PARK AVE
2.0
12/05/07
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0
0
09/01/06
107,034
100
09/15/05
287,188
100
90,310 04/17/06
06/19/06
63,196
100
90,310 04/17/06
06/19/06
63,196
100
0
0
103,647
100
0
0
0
0
0
0
04/29/08
461,234
0
95
04/28/08
461,234
0
0
1,953,088
624,261
17.0
0 170,000 07/11/05
08/19/05
Blocks
300 03 0023 / 4894
ON S LEAMINGTON AVE FROM W 47TH ST TO W 49TH ST
2.0
07/01/04
08/01/04
57,000 06/14/04
09/09/04
57,000
100
300 06 0235 / 5349
ON S NASHVILLE AVE FROM W 53RD ST TO W ARCHER AVE
2.0
06/25/03
08/25/03
168,866 06/20/03
08/15/03
152,178
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 06 / 32969
ON S CENTRAL AVE FROM W 60TH ST TO W 62ND ST JOINT PROJECT WITH CITY LIGHTS Note Last Updated on 04-MAR-09
4.0
225,866
209,178
Locations 1.0
12/03/07
02/29/08
60,000 01/11/08
03/28/08
34,407
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 241
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0108 / 5263
ON S ARCHER AVE FROM S KOSTNER AVE TO S SACRAMENTO AVE
300 09 / 33089
ON S AUSTIN AVE FROM S ARCHER AVE TO W 59TH ST
300 11 / 32202
Locations 29.40
05/23/03
06/10/03
10,838 05/23/03
06/26/03
9,251
100
36.0
09/15/08
09/19/08
10,700 09/15/08
09/19/08
7,812
100
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
14.85
08/07/07
08/18/07
3,267 08/07/07
08/18/07
3,267
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
11.25
06/02/08
06/13/08
3,375 06/02/08
06/13/08
2,363
100
300 03 0023 / 4894
ON S NASHVILLE AVE FROM W 51ST ST TO W 65TH ST
57.0
07/01/04
08/01/04
11,400 07/13/04
10/01/04
8,722
100
300 03 0023 / 4894
ON S NATCHEZ AVE FROM W 51ST ST TO W 65TH ST
56.0
07/01/04
08/01/04
11,200 07/13/04
10/01/04
8,569
100
300 03 0023 / 4894
ON S NEW ENGLAND AVE FROM W 51ST ST TO W 65TH ST
54.0
07/01/04
08/01/04
10,800 07/13/04
10/01/04
8,263
100
300 03 0023 / 4894
ON S NORMANDY AVE FROM W 51ST ST TO W 65TH ST
57.0
07/01/04
08/01/04
11,400 07/13/04
10/01/04
8,722
100
300 03 0023 / 4894
ON S SAYRE AVE FROM W 51ST ST TO W 65TH ST
34.0
07/01/04
08/01/04
6,800 07/13/04
10/01/04
5,203
100
300 03 0014 / 4885
ON W 47TH ST FROM S ROCKWELL ST TO S KNOX AVE
51.48
06/01/04
06/21/04
13,580 05/11/04
06/30/04
14,609
100
300 03 0023 / 4894
ON W 53RD ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
3,400 07/13/04
10/01/04
2,602
100
300 03 0023 / 4894
ON W 54TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
18.0
07/01/04
08/01/04
3,600 07/13/04
10/01/04
2,755
100
300 04 0216 / 5114
ON W 55TH ST FROM S PULASKI RD TO S KEELER AVE
9.0
05/01/06
11/01/06
1,911 05/17/06
06/29/06
1,911
100
302 00 0076 / 5764
ON W 55TH ST FROM S WESTERN AVE TO S CENTRAL PARK AVE
.0
09/01/00
12/31/00
300 03 0014 / 4885
ON W 55TH ST FROM S WESTERN AVE TO S PULASKI RD
51.50
05/10/04
06/16/04
15,075 05/11/04
06/04/04
11,716
100
300 03 0023 / 4894
ON W 56TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
3,400 07/13/04
10/01/04
2,602
100
300 03 0023 / 4894
ON W 57TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
3,400 07/13/04
10/01/04
2,602
100
300 03 0023 / 4894
ON W 58TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
17.0
07/01/04
08/01/04
3,400 07/13/04
10/01/04
2,602
100
300 03 0023 / 4894
ON W 59TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
15.0
07/01/04
08/01/04
3,000 07/13/04
10/01/04
2,296
100
300 03 0023 / 4894
ON W 60TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
16.0
07/01/04
08/01/04
3,200 07/13/04
10/01/04
2,449
100
300 03 0023 / 4894
ON W 61ST ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
13.0
07/01/04
08/01/04
2,600 07/13/04
10/01/04
1,990
100
300 03 0023 / 4894
ON W 62ND ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
23.0
07/01/04
08/01/04
4,600 07/13/04
10/01/04
3,520
100
302 00 0077 / 5765
ON W 63RD PL FROM S NARRAGANSETT AVE TO S NATCHEZ AVE
5.0
0 05/14/99
05/14/99
437
100
302 00 0076 / 5764
ON W 63RD ST FROM S KEDZIE AVE TO S AUSTIN AVE
300 03 0023 / 4894 300 03 0023 / 4894 300 06 0108 / 5263
0
36.96
09/01/00
12/31/00
ON W 64TH PL FROM S HARLEM AVE TO S NARRAGANSETT AVE
28.0
07/01/04
08/01/04
5,600 07/13/04
10/01/04
4,285
100
ON W 64TH ST FROM S HARLEM AVE TO S NARRAGANSETT AVE
28.0
07/01/04
08/01/04
5,600 07/13/04
10/01/04
4,285
100
W 63RD ST AND S CICERO AVE
10.0
06/25/03
07/04/03
3,800 07/25/03
08/05/03
3,290
100
Totals per Strt Light Pole Painting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
0
5838 S ARCHER AVE
722.44
0
628
155,945
126,750
Lamps 1,195.0
03/01/04
12/01/04
6,214 07/31/06
08/30/06
13,014
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 242
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
302 00 0070 / 5758
5600 N CICERO AVE
0 10/14/97
10/27/97
18,940
100
805 06 2131 / 8317
5600 N CICERO AVE
12.0
10/24/97
10/24/97
0 10/24/97
10/24/97
9,000
100
805 06 2132 / 8318
5600 N CICERO AVE
13.0
11/03/97
11/03/97
0 11/03/97
11/03/97
9,750
100
805 06 2133 / 8319
5600 N CICERO AVE
12.0
10/23/97
10/23/97
0 10/23/97
10/23/97
9,000
100
805 06 2134 / 8320
5600 N CICERO AVE
12.0
10/27/97
10/27/97
0 10/27/97
10/27/97
9,000
100
300 06 0217 / 5337
5838 S ARCHER AVE
24.0
08/17/04
08/19/04
1,349 08/16/04
08/23/04
7,052
100
805 06 2281 / 8467
4150 S CICERO AVE
6.0
12/09/96
12/09/96
0 12/09/96
12/09/96
4,500
100
805 06 2307 / 8493
4150 S CICERO AVE
18.0
12/09/96
12/09/96
0 12/09/96
12/09/96
13,500
100
805 06 2461 / 8647
5399 S CICERO AVE
22.0
07/19/93
07/19/93
0 07/19/93
07/19/93
16,500
100
805 06 2575 / 8761
4625 W 47TH ST
16.0
04/01/95
04/01/95
0 04/01/95
04/01/95
12,000
100
Totals per Underpass Lighting
135.0
1,349
109,242
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 243
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S AUSTIN AVE AND W 63RD ST
.50
0 08/29/02
08/29/02
4,675
100
210 06 0130 / 4389
S CICERO AVE AND W 59TH ST
.50
0 11/05/02
11/05/02
925
100
210 06 0130 / 4389
S KOSTNER AVE AND W 47TH ST
.50
0 10/18/01
10/18/01
4,270
100
210 06 0130 / 4389
S MELVINA AVE AND W 63RD ST
.50
0 08/28/02
08/28/02
4,675
100
210 06 0130 / 4389
S NARRAGANSETT AVE AND W 63RD ST
1.0
0 08/22/02
08/22/02
9,349
100
210 06 0130 / 4389
S OAK PARK AVE AND W 63RD ST
1.0
0 08/20/02
08/20/02
8,944
100
4.0
0
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
Locations
300 05 0023 / 5138
S ARCHER AVE AND S KEELER AVE
1.0
04/04/05
11/18/05
75,000 04/18/06
300 05 0023 / 5138
W 63RD ST AND S NARRAGANSETT AVE
1.0
04/04/05
11/18/05
75,000 05/15/06
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0127 / 4386
W 55TH ST AND S KILBOURN AVE
Work Type: Removal Temp Wiring - Signals
32,837
2.0
05/30/06
36,584
100
95,430
80
150,000
132,014
105,000
161,541
100
Locations .50
12/01/06
03/31/07
Crossings
300 06 0197 / 5322
W 63RD ST AND S LATROBE AVE
.50
2,000 06/08/01
08/01/01
134
100
300 06 0197 / 5322
W 63RD ST AND S NARRAGANSETT AVE
1.0
4,000 06/08/01
07/11/01
4,039
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
5838 S ARCHER AVE
1.50
6,000
4,173
Intersections 38.0
09/01/03
09/07/03
0 08/15/03 563,447
08/20/03
6,009 2,024,337
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 244
1/1/2008 AND 12/31/2008
Ward 23 Michael R. Zalewski CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0187 / 4432
W 63RD ST AND S LATROBE AVE
.50
06/01/04
08/15/06
100,000 06/14/04
09/27/06
89,629
100
210 06 0217 / 4457
W ARCHER AVE AND S SAYRE AVE
1.0
10/01/05
12/01/05
200,000 09/02/05
11/22/05
192,731
100
814 06 0282 / 16494
5048 N CICERO AVE
1.0
10/08/91
10/08/91
0 10/08/91
10/08/91
134,857
100
814 06 0150 / 16364
6201 N NAGLE AVE
1.0
08/29/90
08/29/90
0 08/29/90
08/29/90
103,851
100
814 06 0096 / 16312
5500 S CENTRAL AVE
1.0
02/09/95
02/09/95
0 02/09/95
02/09/95
239,189
100
814 06 0348 / 16546
4700 S CICERO AVE
1.0
03/16/89
03/16/89
0 03/16/89
03/16/89
418,644
100
814 06 0349 / 16547
5200 S CICERO AVE
1.0
07/10/90
07/10/90
0 07/10/90
07/10/90
418,644
100
814 06 0080 / 16296
5000 W 55TH ST
1.0
11/18/94
11/18/94
0 11/18/94
11/18/94
88,242
100
7.50
Totals per TSM Install
Work Type: Traffic Equipment Painting
300,000
1,685,787
Locations
300 11 / 32202
ON S AUSTIN AVE FROM W 59TH ST TO W 65TH ST
.66
08/07/07
08/18/07
297 08/07/07
08/18/07
297
100
300 09 / 33079
ON S NARRAGANSETT AVE FROM W 63RD ST TO W 65TH ST
.75
06/02/08
06/13/08
150 06/02/08
06/13/08
63
100
300 09 / 33089
W 55TH ST AND S AUSTIN AVE
1.0
09/22/08
09/23/08
2,000 09/22/08
09/23/08
1,617
100
2.41
2,447
1,977
Totals per Construction Phase
3,505,458
3,689,345
Totals for Ward 23
3,513,358
3,700,044
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 245
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32277
ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST
300 09 / 33078
ON S MARSHALL BLVD FROM W 21ST ST TO W 24TH BLVD
210 06 0127 / 4386 210 06 0243 / 4480
Projects 4.0
04/01/08
08/30/08
260,000 03/29/08
05/19/08
0
.0
01/01/08
05/30/08
0 04/01/08
12/01/08
0
0
S KEDZIE AVE AND W ROOSEVELT RD
1.0
12/15/05
03/15/06
0 12/15/05
02/09/06
939
100
W HARRISON ST AND S LARAMIE AVE
.0
12/26/06
01/26/07
250 12/26/06
01/26/07
638
100
Totals per Design/Engineering
5.0
260,250
1,577
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 246
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 05 0024 / 5139
ON S CHRISTIANA AVE FROM W DOUGLAS BLVD TO W 16TH ST
6.0
04/04/05
11/18/05
3,300 07/15/05
08/10/05
1,314
100
300 05 0024 / 5139
ON S KILBOURN AVE FROM W LEXINGTON ST TO W FIFTH AVE
6.0
04/04/05
11/18/05
3,300 07/15/05
08/10/05
1,314
100
300 05 0024 / 5139
ON S LAWNDALE AVE FROM W 18TH ST TO W OGDEN AVE
6.0
04/04/05
11/18/05
3,300 07/15/05
08/10/05
1,314
100
300 05 0024 / 5139
ON S SPRINGFIELD AVE FROM W 18TH ST TO W 19TH ST
3.0
04/04/05
11/18/05
2,100 07/15/05
08/10/05
657
100
300 03 0012 / 4883
ON S TROY ST FROM W 24TH ST TO W 25TH ST
2.50
10/01/04
10/10/04
975 10/08/04
10/19/04
559
100
300 05 0024 / 5139
ON W 21ST ST FROM S KEELER AVE TO S KILDARE AVE
5.0
04/04/05
11/18/05
2,200 07/15/05
08/10/05
4,502
100
300 03 0012 / 4883
ON W 25TH ST FROM S SAWYER AVE TO S CALIFORNIA AVE
.55
10/01/04
10/10/04
215 10/08/04
10/19/04
123
100
300 05 0024 / 5139
ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE
6.0
04/04/05
11/18/05
3,300 07/15/05
08/10/05
1,314
100
300 06 0122 / 5275
ON W CULLERTON ST FROM S KARLOV AVE TO S KEELER AVE
5.0
11/20/03
11/20/03
2,075 11/18/03
11/19/03
1,151
100
300 05 0024 / 5139
ON W FLOURNOY ST FROM S HOMAN AVE TO S ST LOUIS AVE
3.0
04/04/05
11/18/05
2,100 07/15/05
08/10/05
657
100
300 05 0024 / 5139
ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE
1.50
04/04/05
11/18/05
1,050 07/15/05
08/10/05
329
100
300 05 0024 / 5139
ON W VAN BUREN ST FROM S KILPATRICK AVE TO S CICERO AVE
6.0
04/04/05
11/18/05
3,300 07/15/05
08/10/05
1,314
100
302 00 0092 / 5774
S KILPATRICK AVE AND W CONGRESS PKWY
1.0
02/02/02
02/02/02
203 01/30/02
01/30/02
210
100
300 06 0069 / 5233
2100 S KARLOV AVE
1.0
09/08/02
09/08/02
210 09/05/02
09/05/02
203
100
300 06 0122 / 5275
1600 S KOMENSKY AVE
4.0
08/01/04
08/02/04
1,700 08/01/04
08/01/04
1,850
100
300 06 0122 / 5275
2300 S TROY ST
4.0
08/01/04
08/02/04
1,700 04/30/04
04/30/04
1,114
100
302 00 0092 / 5774
3400-3499 W 12TH PL
5.0
10/18/01
10/18/01
1,029 09/29/01
09/29/01
1,029
100
300 06 0069 / 5233
3800 W FILLMORE ST
5.0
06/19/02
06/19/02
1,050 06/16/02
06/16/02
1,015
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
70.55
33,107
19,968
Fixtures
300 05 0024 / 5139
ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD
68.0
04/04/05
11/18/05
27,200 07/15/05
08/10/05
23,800
100
300 07 0024 / 5447
ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE
38.0
04/18/06
11/18/06
15,600 11/01/06
11/13/06
0
100
300 07 0024 / 5447
ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE
23.0
04/18/06
11/18/06
9,200 11/01/06
11/13/06
0
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
129.0
52,000
23,800
2,411,019
1,973,703
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 247
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0792 / 6978
2114 S ALBANY AVE
1.0
10/31/95
10/31/95
0 10/31/95
10/31/95
300
100
805 06 0793 / 6979
2144 S ALBANY AVE
1.0
10/31/95
10/31/95
0 10/31/95
10/31/95
300
100
805 06 1160 / 7346
621 S KEDVALE AVE
1.0
05/09/96
05/09/96
0 05/09/96
05/09/96
300
100
805 06 2022 / 8208
620 S KOLMAR AVE
1.0
10/05/95
10/05/95
0 10/05/95
10/05/95
300
100
805 06 0935 / 7121
4014 W 16TH ST
1.0
10/23/96
10/23/96
0 10/23/96
10/23/96
300
100
805 06 0748 / 6934
3137 W ARTHINGTON ST
1.0
07/19/95
07/19/95
0 07/19/95
07/19/95
300
100
805 06 1104 / 7290
4525 W HARRISON ST
1.0
10/10/95
10/10/95
0 10/10/95
10/10/95
300
100
805 06 1762 / 7948
4736 W POLK ST
1.0
05/09/97
05/09/97
0 05/09/97
05/09/97
300
100
300 06 0139 / 5289
4325 W ROOSEVELT RD
1,099.0
03/01/06
09/01/06
27,116 05/10/06
06/10/06
33,205
100
302 00 0092 / 5774
4325 W ROOSEVELT RD
8.0
0 02/19/01
09/25/01
1,885
100
1,115.0
Totals per Alley Lighting/Lamps
4325 W ROOSEVELT RD
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1,953.0
Work Type: Flood Light Install W ARTHINGTON ST AND S KEDZIE AVE
300 06 0071 / 5234
1401 S SACRAMENTO AVE
302 00 0092 / 5774
1522 S SAWYER AVE
302 00 0092 / 5774
4941 W VAN BUREN ST
06/01/07
12/31/07
57,496 06/05/07
07/31/07
57,496
100
0 06/12/02
06/15/02
32,010
100
Installations
4325 W ROOSEVELT RD
300 06 0167 / 5306
37,490
Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
27,116
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting
1,758.0
Fixtures 4.0
0 05/06/99
05/06/99
1,404
100
81,000 02/17/99
04/20/00
31,745
100
1.0
0 10/04/01
10/04/01
404
100
1.0
0 05/07/01
05/07/01
471
100
02/15/99
04/15/00
6.0
81,000
34,024
Fixtures
300 05 0024 / 5139
ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD
80.0
04/04/05
11/18/05
108,000 07/15/05
08/10/05
79,544
100
300 07 0024 / 5447
ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE
30.0
04/18/06
11/18/06
40,500 12/10/06
12/22/06
0
100
300 07 0024 / 5447
ON W ROOSEVELT RD FROM S KEDZIE AVE TO S ALBANY AVE
12.0
04/18/06
11/18/06
16,200 12/10/06
12/22/06
0
100
Totals per Ornamental - Piggyback Lighting
122.0
164,700
79,544
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 248
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting 300 09 / 33090
ON S MARSHALL BLVD FROM W 21ST ST TO W CERMAK RD
Work Type: Residential Regrouping 300 06 0270 / 5378
1630 S CENTRAL PARK AVE
Blocks .50
50,000 04/01/08
12/01/08
0
0
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 249
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 11 / 32213
ON S ALBANY AVE FROM W CERMAK RD TO W 23RD ST
1.0
01/18/08
04/09/08
55,000 01/18/08
04/09/08
52,104
100
300 09 / 33090
ON S AVERS AVE FROM W ROOSEVELT RD TO W 14TH ST
2.0
04/05/08
05/19/08
130,000 04/01/08
12/01/08
0
100
300 11 / 32213
ON S DRAKE AVE FROM W 16TH ST TO W 18TH ST
1.0
01/18/08
03/28/08
55,000 01/18/08
04/09/08
51,743
100
300 09 / 33090
ON S DRAKE AVE FROM W 18TH ST TO W OGDEN AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 06 / 32277
ON S HARDING AVE FROM W ROOSEVELT RD TO W 16TH ST
.0
05/04/08
12/31/08
0
300 09 / 33090
ON S KARLOV AVE FROM W 14TH ST TO W 16TH ST
2.0
04/02/08
04/15/08
130,000 04/01/08
300 11 / 32213
ON S LAWNDALE AVE FROM W ROOSEVELT RD TO W 13TH ST
1.0
01/18/08
03/28/08
300 11 / 32213
ON S RIDGEWAY AVE FROM W 15TH ST TO W 16TH ST
1.0
01/18/08
03/28/08
300 11 / 32213
ON S SAWYER AVE FROM W 19TH ST TO W 21ST ST
1.0
11/27/07
300 11 / 32213
ON S SPAULDING AVE FROM W 15TH ST TO W 16TH ST
1.0
300 11 / 32213
ON S SPAULDING AVE FROM W 19TH ST TO W 21ST ST
300 09 / 33090
0
0
12/01/08
0
100
55,000 01/18/08
04/09/08
51,830
100
55,000 01/18/08
04/09/08
51,953
100
01/25/08
55,000 11/27/07
01/25/08
60,348
100
11/27/07
01/25/08
55,000 11/27/07
01/25/08
60,881
100
1.0
01/18/08
03/28/08
55,000 01/18/08
04/25/08
51,408
100
ON S ST LOUIS AVE FROM W 16TH ST TO W OGDEN AVE
2.0
03/22/08
03/27/08
0 04/01/08
12/01/08
130,000
100
300 06 0298 / 5405
ON S ST LOUIS AVE FROM W OGDEN AVE TO W CERMAK RD
2.0
0 10/11/05
12/02/05
107,801
100
300 11 / 32213
ON S TROY ST FROM W FILLMORE ST TO W ROOSEVELT RD
1.0
55,000 10/15/07
01/11/08
49,451
100
300 09 / 33090
ON S TROY ST FROM W ROOSEVELT RD TO W DOUGLAS BLVD
2.0
130,000 04/01/08
12/01/08
0
0
300 11 / 32213
ON W CONGRESS PKWY FROM S KILPATRICK AVE TO S CICERO AVE
1.0
10/15/07
01/11/08
55,000 10/15/07
01/11/08
49,051
100
300 11 / 32213
ON W FLOURNOY ST FROM S SPAULDING AVE TO S HOMAN AVE
1.0
10/15/07
01/11/08
55,000 10/15/07
01/11/08
49,551
100
300 11 / 32213
ON W FLOURNOY ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE
1.0
10/15/07
01/11/08
55,000 10/15/07
01/11/08
49,668
100
300 11 / 32213
ON W GLADYS AVE FROM S CICERO AVE TO S KILPATRICK AVE
1.0
01/18/08
03/28/08
55,000 01/18/08
04/25/08
51,563
100
300 11 / 32213
ON W GLADYS AVE FROM S CICERO AVE TO S LAVERGNE AVE
2.0
11/27/07
01/25/08
110,000 11/27/07
01/25/08
120,500
100
300 09 / 33090
ON W GLADYS AVE FROM S KOSTNER AVE TO S KOLMAR AVE
2.0
130,000 04/01/08
12/01/08
0
0
300 11 / 32213
ON W LEXINGTON ST FROM S ALBANY AVE TO S KEDZIE AVE
1.0
55,000 10/15/07
01/11/08
49,382
100
300 09 / 33090
ON W LEXINGTON ST FROM S SPAULDING AVE TO S ST LOUIS AVE
2.0
300 11 / 32213
ON W LEXINGTON ST FROM S ST LOUIS AVE TO S CENTRAL PARK AVE
300 11 / 32213
ON W LEXINGTON ST FROM S ST LOUIS AVE TO S LAWNDALE AVE
300 09 / 33090
ON W VAN BUREN ST FROM S KOSTNER AVE TO S KOLMAR AVE
300 11 / 32213
ON W VAN BUREN ST FROM S SPRINGFIELD AVE TO S PULASKI RD
Totals per Residntl Staggered Lighting
10/15/07
01/11/08
10/15/07
01/11/08
130,000 04/01/08
12/01/08
0
0
1.0
01/04/08
03/28/08
55,000 11/28/07
01/11/08
49,081
100
1.0
10/15/07
01/11/08
55,000 10/15/07
01/11/08
49,081
100
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
1.0
11/27/07
01/25/08
55,000 11/27/07
01/25/08
60,881
100
32.0
1,640,000
1,196,277
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 250
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 03 0024 / 4895
ON S TROY ST FROM W OGDEN AVE TO W 21ST ST
10/01/04
11/15/04
8,752 10/08/04
12/14/04
2,113
100
300 06 0122 / 5275
ON S TROY ST FROM W OGDEN AVE TO W 21ST ST
10/02/04
11/30/04
17,887 10/08/04
12/14/04
17,887
100
300 06 0267 / 5375
ON S TROY ST FROM W OGDEN AVE TO W 21ST ST
10/01/04
12/01/04
150,000 10/08/04
12/14/04
141,901
100
300 03 0024 / 4895
ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE
10/01/04
11/15/04
8,752 10/08/04
12/14/04
2,113
100
300 06 0122 / 5275
ON W 19TH ST FROM S KEDZIE AVE TO S ALBANY AVE
10/02/04
11/30/04
17,887 10/08/04
12/14/04
17,887
100
300 03 0024 / 4895
ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE
10/01/04
11/15/04
8,752 10/08/04
12/14/04
2,113
100
300 06 0122 / 5275
ON W 21ST ST FROM S KEDZIE AVE TO S ALBANY AVE
10/02/04
11/30/04
17,887 10/08/04
12/14/04
17,887
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
2.0
2.0
229,917
201,901
Locations
302 00 0092 / 5774
1303 S LAWNDALE AVE
2.0
0 02/20/01
02/20/01
756
100
302 00 0092 / 5774
1325 S LAWNDALE AVE
1.0
0 02/20/01
02/20/01
378
100
302 00 0092 / 5774
1400 S ST LOUIS AVE
1.0
0 03/01/01
03/01/01
378
100
302 00 0092 / 5774
4935 W VAN BUREN ST
1.0
0 05/07/01
05/07/01
378
100
302 00 0092 / 5774
4949 W VAN BUREN ST
1.0
0 05/07/01
05/07/01
378
100
6.0
0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
2,268
Locations
300 05 0024 / 5139
ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD
76.0
04/04/05
11/18/05
24,500 08/01/05
09/08/05
16,439
100
300 04 0216 / 5114
ON W CERMAK RD FROM S KEDZIE AVE TO S MARSHALL BLVD
16.0
05/01/06
11/01/06
3,461 05/17/06
08/30/06
3,461
100
300 07 0024 / 5447
ON W FIFTH AVE FROM S PULASKI RD TO S KOSTNER AVE
30.0
04/18/06
11/18/06
7,500 07/16/06
07/24/06
6,360
100
300 07 0024 / 5447
ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE
12.0
04/18/06
11/18/06
3,000 07/16/06
07/24/06
2,544
100
300 06 0081 / 5244
4600 W ROOSEVELT RD
0 05/22/98
05/22/98
444
100
Totals per Strt Light Pole Painting
Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
4325 W ROOSEVELT RD
7.0 141.0
38,461
29,248
Lamps 3,162.0
06/01/06
12/31/06
18,000 09/20/06
09/27/06
16,442
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 251
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2585 / 8771
1000 S ALBANY AVE
805 06 2799 / 8985
2201 S CENTRAL PARK AVE
805 06 2806 / 8992
Fixtures 18.0
05/09/95
05/09/95
0 05/09/95
05/09/95
13,500
100
6.0
05/18/94
05/18/94
0 05/18/94
05/18/94
4,500
100
1001 S CICERO AVE
10.0
12/31/93
12/31/93
0 12/31/93
12/31/93
7,500
100
805 06 2592 / 8778
1095 S HOMAN AVE
22.0
03/20/95
03/20/95
0 03/20/95
03/20/95
16,500
100
805 06 2589 / 8775
1005 S INDEPENDENCE BLVD
14.0
05/12/93
05/12/93
0 05/12/93
05/12/93
10,500
100
805 06 2591 / 8777
1005 S INDEPENDENCE BLVD
12.0
05/12/93
05/12/93
0 05/12/93
05/12/93
9,000
100
805 06 2805 / 8991
1000 S KARLOV AVE
14.0
04/20/94
04/20/94
0 04/20/94
04/20/94
10,500
100
805 06 2586 / 8772
1001 S KEDZIE AVE
14.0
08/27/91
08/27/91
0 08/27/91
08/27/91
10,500
100
302 00 0071 / 5759
1020 S KEDZIE AVE
0 10/20/98
10/30/98
12,305
100
805 06 2949 / 9135
2105 S KEDZIE AVE
8.0
02/23/94
02/23/94
0 02/23/94
02/23/94
6,000
100
805 06 2595 / 8781
1005 S KEELER AVE
10.0
05/04/95
05/04/95
0 05/04/95
05/04/95
7,500
100
805 06 2243 / 8429
600 S KOLMAR AVE
10.0
04/19/93
04/19/93
0 04/19/93
04/19/93
7,500
100
805 06 2807 / 8993
820 S KOSTNER AVE
10.0
04/14/94
04/14/94
0 04/14/94
04/14/94
7,500
100
805 06 2804 / 8990
1095 S PULASKI RD
10.0
04/26/94
04/26/94
0 04/26/94
04/26/94
7,500
100
805 06 2801 / 8987
1095 S SPAULDING AVE
24.0
04/20/94
04/20/94
0 04/20/94
04/20/94
18,000
100
805 06 2473 / 8659
1005 S SPRINGFIELD AVE
6.0
08/17/95
08/17/95
0 08/17/95
08/17/95
4,500
100
805 06 2366 / 8552
4595 W FIFTH AVE
12.0
06/14/93
06/14/93
0 06/14/93
06/14/93
9,000
100
805 06 2931 / 9117
4535 W HARRISON ST
10.0
04/19/93
04/19/93
0 04/19/93
04/19/93
7,500
100
302 00 0070 / 5758
4600 W HARRISON ST
0 01/15/98
01/23/98
15,405
100
805 06 2915 / 9101
4535 W JACKSON BLVD
11.0
03/01/94
03/01/94
0 03/01/94
03/01/94
8,250
100
805 06 2242 / 8428
4533 W LEXINGTON ST
4.0
09/04/96
09/04/96
0 09/04/96
09/04/96
3,000
100
805 06 2368 / 8554
4535 W POLK ST
10.0
04/02/93
04/02/93
0 04/02/93
04/02/93
7,500
100
300 06 0217 / 5337
4325 W ROOSEVELT RD
342.0
12/22/03
12/29/03
19,223 12/15/03
12/19/03
18,275
100
805 06 2369 / 8555
4547 W ROOSEVELT RD
18.0
10/23/95
10/23/95
0 10/23/95
10/23/95
13,500
100
805 06 2153 / 8339
4535 W VAN BUREN ST
10.0
06/24/93
06/24/93
0 06/24/93
06/24/93
7,500
100
Totals per Underpass Lighting
605.0
19,223
243,235
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 252
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S PULASKI RD AND W 15TH ST
1.0
0 07/12/02
07/12/02
7,324
100
210 06 0130 / 4389
S SPAULDING AVE AND W ROOSEVELT RD
1.0
0 08/16/02
08/16/02
8,539
100
2.0
0
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0127 / 4386
S KEDZIE AVE AND W ROOSEVELT RD
Work Type: New Signal 210 06 0138 / 4396
3300 W ROOSEVELT RD
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W HARRISON ST AND S LARAMIE AVE
Work Type: Removal Temp Wiring - Signals
15,863
Locations 1.0
09/30/06
10/30/06
95,000 05/03/06
09/01/06
85,537
100
10/01/02
01/01/03
222,600 06/14/02
08/16/02
190,585
100
03/15/06
05/08/07
6,000 12/26/06
02/13/07
2,959
100
Locations 1.0
Locations .0
Crossings
300 06 0197 / 5322
S KEELER AVE AND W 16TH ST
3.0
12,000 07/11/01
08/01/01
3,278
100
300 06 0197 / 5322
W 19TH ST AND S PULASKI RD
2.0
8,000 06/14/01
06/27/01
6,348
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
4325 W ROOSEVELT RD
Work Type: TSM Install
5.0
20,000
9,626
Intersections 55.0
11/10/03
11/12/03
0 11/01/03
11/10/03
8,697
100
Locations
210 06 0022 / 4297
S PULASKI RD AND W 15TH ST
1.0
06/01/02
10/01/02
186,800 04/18/02
07/12/02
108,292
100
814 06 0218 / 16430
348 N CICERO AVE
1.0
08/07/92
08/07/92
0 08/07/92
08/07/92
40,173
100
814 06 0219 / 16431
600 S CICERO AVE
1.0
02/13/92
02/13/92
0 02/13/92
02/13/92
40,173
100
814 06 0224 / 16436
700 S CICERO AVE
1.0
03/12/92
03/12/92
0 03/12/92
03/12/92
40,173
100
814 06 0221 / 16433
728 S CICERO AVE
1.0
03/12/92
03/12/92
0 03/12/92
03/12/92
40,173
100
210 06 0138 / 4396
1132 S HOMAN AVE
1.0
12/01/02
03/01/03
200,000 11/07/02
01/29/03
152,161
100
210 06 0034 / 4305
2300 S KEDZIE AVE
1.0
07/01/98
09/30/98
160,000 12/01/98
05/14/99
145,518
100
Totals per TSM Install Totals per Traffic
7.0
546,800
566,663
900,050
891,075
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 253
1/1/2008 AND 12/31/2008
Ward 24 Sharon Denise Dixon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting 300 05 0024 / 5139
ON S CENTRAL PARK AVE FROM W ROOSEVELT RD TO W CERMAK RD
300 07 0024 / 5447
ON W ROOSEVELT RD FROM S ALBANY AVE TO S KEDZIE AVE
Locations 32.0
04/04/05
11/18/05
6,900 08/01/05
09/08/05
9,661
100
7.0
04/18/06
11/18/06
2,750 07/16/06
07/24/06
1,484
100
39.0
9,650
11,145
Totals per Construction Phase
3,311,069
2,864,778
Totals for Ward 24
3,571,319
2,866,354
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 254
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414
ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST
300 06 0282 / 5390
ON S MORGAN ST FROM W 14TH PL TO W 15TH ST
Projects .0
02/01/06
07/31/06
0 02/01/06
07/31/06
995
100
1.0
11/16/04
02/15/05
15,000 11/01/04
02/15/05
13,417
100
300 06 0292 / 5399
S. Morgan from 14PL. to W. 15th PL/Work to be constructed by Private contractor. BOE to be notified by inspectional sevices when completed and approved. Note Last Updated on 22-FEB-07 ON W 15TH ST FROM S HALSTED ST TO S UNION AVE 04/20/05 04/29/05 6,500 04/06/05 11/15/05 2,873 2.0
100
300 06 0308 / 5414
ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD
300 06 0282 / 5390
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
995
100
1650 S BLUE ISLAND AVE
1.0
08/27/04
12/01/04
4,000 09/01/04
09/08/04
1,728
100
300 06 0292 / 5399
2432 S BLUE ISLAND AVE
1.0
08/02/05
09/01/05
1,000 08/02/05
09/01/05
448
100
300 06 0292 / 5399
2437 S DAMEN AVE
1.0
05/20/05
05/24/05
2,000 05/20/05
05/24/05
0
100
300 06 0292 / 5399
837 S WESTERN AVE
1.0
1,500 02/22/05
03/01/05
0
100
Totals per Design/Engineering
7.0
30,000
20,456
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 255
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0122 / 5275
ON S PAULINA ST FROM W CERMAK RD TO W 16TH ST
300 09 / 33091
ON S WOLCOTT AVE FROM S BLUE ISLAND AVE TO W CERMAK RD
300 06 0122 / 5275
Fixtures 21.0
05/12/03
05/12/03
8,275 05/12/03
05/16/03
3,658
100
9.0
08/14/08
08/15/08
3,600 08/14/08
08/15/08
1,945
100
ON S WOLCOTT AVE FROM W CERMAK RD TO W 16TH ST
13.0
05/12/03
05/12/03
5,275 05/12/03
05/15/03
2,271
100
300 06 0122 / 5275
ON S WOOD ST FROM W CERMAK RD TO W 16TH ST
16.0
05/15/03
05/15/03
6,400 05/15/03
05/16/03
2,789
100
300 06 0122 / 5275
ON W 19TH ST FROM S ASHLAND AVE TO S DAMEN AVE
18.0
05/15/03
05/15/03
7,150 05/15/03
05/16/03
3,145
100
300 09 / 33091
ON W 22ND PL FROM S DAMEN AVE TO S WOLCOTT AVE
4.0
08/14/08
08/15/08
1,600 08/14/08
08/15/08
973
100
300 06 0122 / 5275
ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE
2.0
10/20/03
10/21/03
850 11/05/03
11/05/03
850
100
300 09 / 33091
ON W 23RD ST FROM S DAMEN AVE TO S WOLCOTT AVE
4.0
08/14/08
08/15/08
1,600 08/14/08
08/15/08
973
100
300 06 0122 / 5275
ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE
2.0
11/01/03
11/01/03
850 11/05/03
11/05/03
850
100
300 06 0122 / 5275
ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE
2.0
11/01/03
11/01/03
850 11/05/03
11/05/03
850
100
300 06 0122 / 5275
ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE
2.0
11/01/03
11/01/03
850 11/05/03
11/05/03
850
100
300 06 0122 / 5275
ON W CULLERTON ST FROM S ASHLAND AVE TO S DAMEN AVE
20.0
05/14/03
05/14/03
7,900 05/14/03
05/16/03
3,490
100
300 06 0069 / 5233
ON W CULLERTON ST FROM S HALSTED ST TO S RACINE AVE
14.0
08/10/02
08/10/02
2,940 08/07/02
08/07/02
2,842
100
300 09 / 33091
ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST
10.0
02/01/08
12/31/08
4,000 08/25/08
08/26/08
2,430
100
300 06 0122 / 5275
800 S ABERDEEN ST
5.0
02/22/03
02/22/03
1,050 02/19/03
02/19/03
1,015
100
300 06 0122 / 5275
2200 S BELL AVE
5.0
05/08/03
05/08/03
1,050 05/05/03
05/05/03
1,015
100
302 00 0092 / 5774
2400 S BELL AVE
4.0
02/08/02
02/08/02
840 02/05/02
02/05/02
840
100
300 06 0122 / 5275
800 S CARPENTER ST
5.0
02/22/03
02/22/03
1,050 02/19/03
02/19/03
1,015
100
300 06 0069 / 5233
800 S CLAREMONT AVE
5.0
10/11/02
10/11/02
1,050 10/08/02
10/08/02
1,015
100
302 00 0092 / 5774
2300-2399 S HOYNE AVE
5.0
0 10/02/01
10/02/01
1,029
100
302 00 0092 / 5774
2200 S LEAVITT ST
4.0
02/08/02
02/08/02
840 02/05/02
02/05/02
840
100
302 00 0092 / 5774
2300 S LEAVITT ST
6.0
02/08/02
02/08/02
1,260 02/05/02
02/05/02
1,218
100
302 00 0092 / 5774
800 S MAY ST
3.0
0 08/20/01
08/20/01
617
100
300 06 0069 / 5233
700 W 17TH PL
5.0
08/10/02
08/10/02
1,050 08/07/02
08/07/02
1,015
100
300 06 0069 / 5233
2200 W 19TH ST
5.0
11/07/02
11/07/02
1,050 11/04/02
11/04/02
1,015
100
300 06 0122 / 5275
2300 W 22ND PL
4.0
06/01/03
06/03/03
1,900 05/06/03
05/06/03
911
100
300 06 0069 / 5233
300 W 23RD PL
5.0
10/11/02
10/11/02
1,050 10/08/02
10/08/02
1,015
100
302 00 0092 / 5774
2100-2199 W 23RD ST
5.0
10/02/01
10/02/01
1,029 10/02/01
10/02/01
1,029
100
300 06 0069 / 5233
400 W 24TH ST
5.0
07/19/02
07/19/02
1,050 07/16/02
07/16/02
1,015
100
302 00 0092 / 5774
2000-2099 W COULTER ST
5.0
0 10/02/01
10/02/01
1,029
100
302 00 0092 / 5774
2100-2199 W COULTER ST
5.0
0 10/02/01
10/02/01
1,029
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 256
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 302 00 0092 / 5774
2200 W COULTER ST
300 06 0122 / 5275
1400 W FLOURNOY ST
302 00 0092 / 5774
1200-1399 W LEXINGTON ST
300 06 0122 / 5275
1400 W LEXINGTON ST
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 09 / 33091
ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST
300 11 / 32214
ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST
300 06 0122 / 5275
ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST
300 09 / 33091
Fixtures 4.0
02/02/02
02/02/02
20.0
840 01/30/02
01/30/02
812
100
7,500 01/15/03
01/19/03
5,410
100
5.0
10/20/01
10/20/01
1,029 09/28/01
09/28/01
1,029
100
21.0
08/01/04
08/05/04
7,875 01/15/03
01/19/03
5,680
100
268.0
83,653
57,509
Fixtures 3.0
11/05/08
11/13/08
1,200 11/05/08
11/06/08
996
100
22.0
10/25/07
10/25/07
9,200 10/25/07
10/25/07
5,899
100
103.0
11/20/03
12/10/03
45,000 11/05/03
11/10/03
26,781
100
ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE
15.0
10/21/08
10/30/08
6,000 10/21/08
10/30/08
4,875
100
300 09 / 33091
ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST
11.0
02/01/08
12/31/08
4,400 09/24/08
09/26/08
3,740
100
300 11 / 32214
ON W CULLERTON ST FROM S OAKLEY AVE TO S WESTERN AVE
5.0
10/25/07
10/25/07
2,200 10/25/07
10/25/07
1,468
100
300 09 / 33068
ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE
2.0
10/13/08
10/17/08
800 10/06/08
10/08/08
800
100
300 09 / 33091
ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST
12.0
02/01/08
12/31/08
4,800 09/08/08
09/09/08
3,984
100
302 00 0092 / 5774
W 24TH ST AND S LEAVITT ST
1.0
03/08/02
03/08/02
400 03/05/02
03/05/02
375
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
174.0
74,000
48,918
1,761,370
3,540,922
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 257
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0883 / 7069
820 S BELL AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 0881 / 7067
821 S BELL AVE
1.0
11/21/96
11/21/96
0 11/21/96
11/21/96
300
100
805 06 1679 / 7865
1618 S BLUE ISLAND AVE
1.0
07/29/97
07/29/97
0 07/29/97
07/29/97
300
100
805 06 0824 / 7010
1830 S BLUE ISLAND AVE
1.0
11/01/96
11/01/96
0 11/01/96
11/01/96
300
100
805 06 1509 / 7695
2550 S BLUE ISLAND AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1752 / 7938
1602 S CARPENTER ST
1.0
05/23/97
05/23/97
0 05/23/97
05/23/97
300
100
805 06 1508 / 7694
2504 S CLAREMONT AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1687 / 7873
2515 S CLAREMONT AVE
1.0
06/26/97
06/26/97
0 06/26/97
06/26/97
300
100
805 06 1115 / 7301
1940 S DESPLAINES ST
1.0
02/06/97
02/06/97
0 02/06/97
02/06/97
300
100
805 06 1199 / 7385
1948 S DESPLAINES ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 0989 / 7175
2002 S DESPLAINES ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1107 / 7293
2010 S DESPLAINES ST
1.0
02/06/97
02/06/97
0 02/06/97
02/06/97
300
100
805 06 1597 / 7783
1112 S HALSTED ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 2004 / 8190
1820 S LAFLIN ST
1.0
01/03/97
01/03/97
0 01/03/97
01/03/97
600
100
805 06 0354 / 6540
803 S LEAVITT ST
1.0
08/05/96
08/05/96
0 08/05/96
08/05/96
300
100
805 06 1680 / 7866
1621 S LOOMIS ST
1.0
07/29/97
07/29/97
0 07/29/97
07/29/97
300
100
300 06 0139 / 5289
2439 S OAKLEY AVE
1,131.0
03/01/06
09/01/06
24,734 02/15/06
03/15/06
34,172
100
302 00 0092 / 5774
2439 S OAKLEY AVE
53.0
0 02/01/01
01/11/02
12,489
100
805 06 1667 / 7853
2452 S OAKLEY AVE
1.0
07/14/97
07/14/97
0 07/14/97
07/14/97
300
100
805 06 0542 / 6728
1800 S PEORIA ST
1.0
01/03/95
01/03/95
0 01/03/95
01/03/95
300
100
805 06 1686 / 7872
2317 S SEELEY AVE
1.0
06/26/97
06/26/97
0 06/26/97
06/26/97
300
100
805 06 1507 / 7693
2425 S WESTERN AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1504 / 7690
2323 S WOLCOTT AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 0464 / 6650
2326 S WOLCOTT AVE
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1505 / 7691
2326 S WOLCOTT AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 0967 / 7153
639 W 18TH ST
1.0
02/06/97
02/06/97
0 02/06/97
02/06/97
300
100
805 06 0968 / 7154
1689 W 18TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 0969 / 7155
1701 W 18TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1204 / 7390
1701 W 18TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1789 / 7975
1701 W 18TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 0972 / 7158
2000 W 18TH ST
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 258
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0973 / 7159
1700 W 19TH ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 0956 / 7142
1702 W 19TH ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 0975 / 7161
1714 W 19TH ST
1.0
12/01/95
12/01/95
0 12/01/95
12/01/95
300
100
805 06 0965 / 7151
1758 W 19TH ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 0949 / 7135
1800 W 21ST PL
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 0947 / 7133
1756 W 21ST ST
1.0
02/06/97
02/06/97
0 02/06/97
02/06/97
300
100
805 06 0948 / 7134
1902 W 21ST ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1501 / 7687
1808 W 22ND PL
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1502 / 7688
1820 W 22ND PL
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
300 06 0122 / 5275
2308 W 22ND PL
16.0
05/06/03
05/09/03
5,600 05/06/03
05/06/03
2,735
100
805 06 0950 / 7136
1900 W 23RD ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 0951 / 7137
2326 W 23RD ST
1.0
04/29/96
04/29/96
0 04/29/96
04/29/96
300
100
805 06 1503 / 7689
2314 W 25TH ST
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1568 / 7754
2327 W 25TH ST
1.0
10/01/97
10/01/97
0 10/01/97
10/01/97
300
100
805 06 1506 / 7692
2336 W 25TH ST
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1205 / 7391
200 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1791 / 7977
200 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 2067 / 8253
200 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 2056 / 8242
1630 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 2048 / 8234
1922 W CERMAK RD
1.0
10/26/95
10/26/95
0 10/26/95
10/26/95
300
100
805 06 1892 / 8078
2000 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 2040 / 8226
2004 W CERMAK RD
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1766 / 7952
1700 W CULLERTON ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1747 / 7933
1703 W CULLERTON ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1728 / 7914
1800 W CULLERTON ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1739 / 7925
1801 W CULLERTON ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1720 / 7906
2003 W CULLERTON ST
1.0
01/14/97
01/14/97
0 01/14/97
01/14/97
300
100
805 06 1598 / 7784
1210 W LEXINGTON ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 0530 / 6716
1057 W POLK ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
Totals per Alley Lighting/Lamps
1,257.0
30,334
66,796
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 259
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
2439 S OAKLEY AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2439 S OAKLEY AVE
Work Type: Flood Light Install
Lamps 2,584.0
06/01/07
12/31/07
76,072 09/01/07
09/15/07
73,773
100
0 06/09/02
06/12/02
45,320
100
4,000 08/25/08
08/26/08
3,280
100
0 05/14/01
05/14/01
471
100
Installations 2,489.0
Fixtures
300 09 / 33091
ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST
8.0
302 00 0092 / 5774
2700 S WESTERN AVE
1.0
300 09 / 33091
1845 W 22ND PL
1.0
10/01/08
10/01/08
500 10/01/08
10/01/08
0
100
300 06 0122 / 5275
2308 W 22ND PL
3.0
05/09/03
05/09/03
2,425 05/06/03
05/06/03
965
100
300 09 / 33091
200 W CERMAK RD
1.0
10/01/08
10/01/08
500 10/01/08
10/01/08
0
100
300 06 0122 / 5275
1400 W FLOURNOY ST
3.0
01/15/03
01/22/03
1,455 01/15/03
01/19/03
970
100
300 06 0167 / 5306
2200 W OGDEN AVE
9.0
0 11/11/99
11/11/99
1,504
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 302 00 0094 / 5776
ON W TAYLOR ST FROM S MORGAN ST TO S ASHLAND AVE
Work Type: Lighting Imprvmnts
02/01/08
12/31/08
26.0
8,880
7,190
Blocks 3.0
0 03/08/98
08/01/99
565,355
100
Installations
300 06 0292 / 5399
2432 S BLUE ISLAND AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
99
300 06 0292 / 5399
open til further notice Note Last Updated on 01-NOV-07 2437 S DAMEN AVE
.0
09/30/05
10/30/05
14,306 09/29/05
11/29/05
10,993
100
300 06 0292 / 5399
837 S WESTERN AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts 300 06 0199 / 5324
2451 S ASHLAND AVE
300 06 0282 / 5390
1650 S BLUE ISLAND AVE
Totals per Lighting Imprvmnts
.0
14,306
10,993
Projects 1.0 .0 1.0
72,350 10/06/04
10/31/04
4,000 09/14/04 76,350
12/15/04
72,318
100
0
100
72,318
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 260
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 09 / 33091
ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST
300 09 / 33091
ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST
300 03 0025 / 4896
Fixtures 6.0
11/05/08
11/13/08
8,100 11/05/08
11/07/08
6,930
100
22.0
09/22/08
10/17/08
29,700 10/06/08
10/16/08
25,410
100
ON W 18TH ST FROM S DAMEN AVE TO S MORGAN ST
110.0
08/01/04
08/18/04
148,500 08/13/04
09/13/04
124,826
100
300 09 / 33091
ON W 18TH ST FROM S DAMEN AVE TO S OAKLEY AVE
43.0
01/12/09
01/30/09
58,050 01/12/09
01/30/09
49,605
100
300 09 / 33091
ON W 21ST ST FROM S DAMEN AVE TO S OAKLEY AVE
15.0
10/21/08
10/30/08
20,250 10/21/08
10/30/08
17,325
100
300 06 0122 / 5275
ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE
4.0
10/25/03
10/25/03
4,800 11/05/03
11/05/03
4,944
100
300 06 0122 / 5275
ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE
5.0
10/25/03
10/25/03
6,000 11/05/03
11/05/03
6,179
100
300 06 0122 / 5275
ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE
4.0
10/25/03
10/25/03
4,800 11/05/03
11/05/03
4,944
100
300 06 0122 / 5275
ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE
4.0
10/25/03
10/25/03
4,800 11/05/03
11/05/03
4,944
100
300 09 / 33091
ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST
11.0
02/01/08
12/31/08
14,850 10/01/08
10/06/08
12,705
100
300 09 / 33068
ON W POLK ST FROM S OAKLEY BLVD TO S WESTERN AVE
2.0
10/20/08
10/24/08
2,700 10/09/08
10/16/08
2,864
100
300 09 / 33091
ON W POLK ST FROM S WESTERN AVE TO S LEAVITT ST
12.0
02/01/08
12/31/08
16,200 10/06/08
10/16/08
13,860
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 300 09 / 33091
ON S SANGAMON ST FROM W 18TH ST TO W CULLERTON ST
Work Type: Residential Regrouping 300 06 0270 / 5378
2439 S OAKLEY AVE
Work Type: Residntl Staggered Lighting
238.0
318,750
274,536
240,000
0
0
0
0
0
Blocks 2.0
Lamps .0
03/01/08
12/01/08
Blocks
300 06 0308 / 5414
ON S CLAREMONT AVE FROM W GRENSHAW ST TO W TAYLOR ST
1.0
06/09/06
08/07/06
53,753 06/09/06
08/07/06
40,195
100
300 06 0298 / 5405
ON S LEAVITT ST FROM W POLK ST TO W TAYLOR ST
2.0
07/15/05
09/01/05
0 07/15/05
09/07/05
94,230
100
300 06 0308 / 5414
ON W GRENSHAW ST FROM S WESTERN AVE TO S OAKLEY BLVD
1.0
06/09/06
08/07/06
53,753 06/09/06
08/07/06
40,195
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
4.0
107,506
174,620
Blocks
300 06 0235 / 5349
ON S CLAREMONT AVE FROM W POLK ST TO W TAYLOR ST
2.0
05/30/03
07/30/03
95,892 05/22/03
07/14/03
92,774
100
300 06 0122 / 5275
ON S OAKLEY AVE FROM W POLK ST TO W TAYLOR ST
2.0
02/15/03
02/28/03
6,300 02/10/03
02/21/03
6,300
100
300 06 0267 / 5375
ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE
2.0
10/15/04
12/15/04
150,000 10/06/04
01/21/05
170,704
100
Totals per Residntl Strt Lighting/Lamps
6.0
252,192
269,778
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 261
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
2259 W 23RD PL
Locations 1.0
0 03/23/01
03/23/01
378
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 262
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 05 0025 / 5140
ON S CARPENTER ST FROM W 21ST ST TO W CULLERTON ST
302 00 0077 / 5765
ON S CLARK ST FROM W 17TH ST TO W 18TH ST
300 05 0025 / 5140
ON S DAMEN AVE FROM W 19TH ST TO W 18TH ST
300 09 / 33068
ON S DAMEN AVE FROM W JACKSON BLVD TO W OGDEN AVE
300 09 / 33091
ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST
300 09 / 33068
ON S LAFLIN ST FROM W POLK ST TO W FILLMORE ST
300 05 0025 / 5140
ON S MAY ST FROM W CULLERTON ST TO W CERMAK RD
300 11 / 32214
Locations 4.0
04/04/05
11/18/05
9.50
800 11/10/05
11/20/05
829
100
0 11/11/99
11/12/99
830
100
6.0
04/04/05
11/18/05
1,200 11/10/05
11/20/05
1,244
100
2.80
06/02/08
06/20/08
560 06/02/08
06/13/08
588
100
6.0
10/22/08
10/23/08
1,800 10/22/08
10/23/08
1,260
100
2.59
06/02/08
06/13/08
777 06/02/08
06/13/08
544
100
8.0
04/04/05
11/18/05
1,600 11/10/05
11/20/05
1,659
100
ON S OAKLEY BLVD FROM W POLK ST TO W GRENSHAW ST
22.0
11/01/07
11/07/07
4,840 10/25/07
10/25/07
4,400
100
300 05 0025 / 5140
ON S PRINCETON AVE FROM W 24TH ST TO W CERMAK RD
13.0
04/04/05
11/18/05
3,250 11/10/05
11/20/05
2,697
100
300 05 0025 / 5140
ON S STEWART AVE FROM W 23RD PL TO W 24TH PL
4.0
04/04/05
11/18/05
800 11/10/05
11/20/05
830
100
300 05 0025 / 5140
ON S WENTWORTH AVE FROM W 24TH ST TO W 24TH PL
2.0
04/04/05
11/18/05
400 11/10/05
11/20/05
415
100
300 09 / 33068
ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST
3.60
06/02/08
06/20/08
720 06/05/08
07/09/08
756
100
300 05 0025 / 5140
ON S WOOD ST FROM W 18TH ST TO W 19TH ST
6.0
04/04/05
11/18/05
1,200 11/10/05
11/20/05
1,245
100
300 03 0025 / 4896
ON W 18TH ST FROM S WESTERN AVE TO S HALSTED ST
172.0
05/01/04
05/10/04
40,320 05/01/04
06/01/04
40,376
100
300 05 0025 / 5140
ON W 19TH ST FROM S WOOD ST TO S DAMEN AVE
11.0
04/04/05
11/18/05
2,200 11/10/05
11/20/05
2,282
100
300 09 / 33091
ON W 21ST PL FROM S DAMEN AVE TO S OAKLEY AVE
15.0
09/22/08
09/26/08
4,500 09/22/08
09/26/08
3,150
100
300 05 0025 / 5140
ON W 22ND PL FROM S WENTWORTH AVE TO S PRINCETON AVE
6.0
04/04/05
11/18/05
1,200 11/10/05
11/20/05
830
100
300 06 0108 / 5263
ON W 23RD PL FROM S STEWART AVE TO S PRINCETON AVE
4.0
09/10/03
09/20/03
1,000 09/05/03
09/07/03
560
100
300 05 0025 / 5140
ON W 23RD PL FROM S WENTWORTH AVE TO S PRINCETON AVE
5.0
04/04/05
11/18/05
1,000 11/10/05
11/20/05
1,037
100
300 06 0108 / 5263
ON W 23RD ST FROM S STEWART AVE TO S PRINCETON AVE
5.0
09/10/03
09/20/03
1,250 09/05/03
09/07/03
560
100
300 05 0025 / 5140
ON W 23RD ST FROM S WENTWORTH AVE TO S PRINCETON AVE
5.0
04/04/05
11/18/05
1,000 11/10/05
11/20/05
1,037
100
300 06 0108 / 5263
ON W 24TH PL FROM S STEWART AVE TO S PRINCETON AVE
4.0
09/10/03
09/20/03
1,000 09/05/03
09/07/03
560
100
300 05 0025 / 5140
ON W 24TH PL FROM S WENTWORTH AVE TO S PRINCETON AVE
6.0
04/04/05
11/18/05
1,200 11/10/05
11/20/05
1,245
100
300 06 0108 / 5263
ON W 24TH ST FROM S STEWART AVE TO S PRINCETON AVE
4.0
09/10/03
09/20/03
1,000 09/05/03
09/07/03
560
100
300 05 0025 / 5140
ON W 24TH ST FROM S WENTWORTH AVE TO S PRINCETON AVE
5.0
04/04/05
11/18/05
1,000 11/10/05
11/20/05
1,037
100
300 05 0025 / 5140
ON W ALEXANDER ST FROM S WENTWORTH AVE TO S PRINCETON AVE
6.0
04/04/05
11/18/05
1,200 11/10/05
11/20/05
1,244
100
300 04 0216 / 5114
ON W CERMAK RD FROM S OAKLEY AVE TO S HOYNE AVE
33.0
05/01/06
11/01/06
7,066 05/17/06
07/12/06
7,066
100
300 09 / 33091
ON W COULTER ST FROM S HOYNE AVE TO S LEAVITT ST
11.0
02/01/08
12/31/08
3,300 09/22/08
09/24/08
2,350
100
300 05 0025 / 5140
ON W CULLERTON ST FROM S CARPENTER ST TO S MAY ST
4.0
04/04/05
11/18/05
800 11/10/05
11/20/05
830
100
300 09 / 33091
ON W FLOURNOY ST FROM S OAKLEY BLVD TO S LEAVITT ST
10.0
02/01/08
12/31/08
1,600 08/25/08
08/26/08
1,008
100
300 11 / 32191
ON W HARRISON ST FROM S RACINE AVE TO S MORGAN ST
17.0
11/14/08
12/15/08
3,400 11/14/08
12/15/08
3,400
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 263
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 09 / 33068
S LAFLIN ST AND W TAYLOR ST
1.0
302 00 0077 / 5765
2100 W OGDEN AVE
6.0
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
06/02/08
06/13/08
419.49
300 06/05/08
06/10/08
210
100
0 08/25/99
08/25/99
524
100
92,283
87,163
Blocks
300 03 0025 / 4896
ON W 18TH PL FROM S LEAVITT ST TO S WESTERN AVE
10/01/04
11/01/04
65,000 10/06/04
01/21/05
27,803
100
300 06 0084 / 5246
2000-2100 S CLARK ST
09/01/98
01/31/99
221,000 10/01/98
02/28/99
233,215
100
303 00 0006 / 5783
2400 W 21ST ST
08/01/97
12/01/97
60,000 08/01/97
04/30/98
76,549
100
346,000
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
2439 S OAKLEY AVE
337,567
Lamps 1,775.0
03/01/04
12/01/04
9,230 09/22/06
09/26/06
19,330
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 264
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2444 / 8630
1820 N HOYNE AVE
10.0
09/11/95
09/11/95
0 09/11/95
09/11/95
7,500
100
805 06 2667 / 8853
1819 N LEAVITT ST
10.0
11/25/94
11/25/94
0 11/25/94
11/25/94
7,500
100
805 06 2329 / 8515
2290 S ARCHER AVE
31.0
05/15/96
05/15/96
0 05/15/96
05/15/96
23,250
100
805 06 2159 / 8345
1583 S BLUE ISLAND AVE
20.0
05/21/97
05/21/97
0 05/21/97
05/21/97
15,000
100
805 06 2186 / 8372
1583 S BLUE ISLAND AVE
50.0
05/21/97
05/21/97
0 05/21/97
05/21/97
37,500
100
302 00 0071 / 5759
2200 S CANAL ST
0 10/08/98
10/14/98
12,802
100
805 06 2658 / 8844
2205 S CANAL ST
14.0
10/01/91
10/01/91
0 10/01/91
10/01/91
10,500
100
805 06 2838 / 9024
1602 S CLARK ST
3.0
12/09/93
12/09/93
0 12/09/93
12/09/93
2,250
100
805 06 2559 / 8745
1695 S DAMEN AVE
200.0
11/13/94
11/13/94
0 11/13/94
11/13/94
150,000
100
805 06 2564 / 8750
1695 S DAMEN AVE
200.0
11/13/94
11/13/94
0 11/13/94
11/13/94
150,000
100
805 06 2584 / 8770
1698 S DAMEN AVE
200.0
11/13/94
11/13/94
0 11/13/94
11/13/94
150,000
100
805 06 2560 / 8746
1699 S DAMEN AVE
200.0
11/13/94
11/13/94
0 11/13/94
11/13/94
150,000
100
805 06 2685 / 8871
1501 S HALSTED ST
18.0
03/11/91
03/11/91
0 03/11/91
03/11/91
13,500
100
805 06 2951 / 9137
1465 S MORGAN ST
44.0
04/04/94
04/04/94
0 04/04/94
04/04/94
33,000
100
805 06 2967 / 9153
1580 S MORGAN ST
20.0
04/04/94
04/04/94
0 04/04/94
04/04/94
15,000
100
805 06 2691 / 8877
1599 S NEWBERRY AVE
38.0
06/06/94
06/06/94
0 06/06/94
06/06/94
28,500
100
805 06 2787 / 8973
2341 S NORMAL AVE
6.0
10/30/91
10/30/91
0 10/30/91
10/30/91
4,500
100
805 06 2846 / 9032
2345 S NORMAL AVE
18.0
10/01/91
10/01/91
0 10/01/91
10/01/91
13,500
100
300 06 0217 / 5337
2439 S OAKLEY AVE
566.0
12/26/03
01/03/04
31,814 12/22/03
12/29/03
20,331
100
805 06 2379 / 8565
1501 S PEORIA ST
18.0
01/10/96
01/10/96
0 01/10/96
01/10/96
13,500
100
805 06 2380 / 8566
1597 S PEORIA ST
50.0
03/01/96
03/01/96
0 03/01/96
03/01/96
37,500
100
805 06 2920 / 9106
1505 S RACINE AVE
20.0
03/18/94
03/18/94
0 03/18/94
03/18/94
15,000
100
805 06 2935 / 9121
1590 S RACINE AVE
42.0
03/18/94
03/18/94
0 03/18/94
03/18/94
31,500
100
805 06 2540 / 8726
1501 S SANGAMON ST
22.0
06/06/95
06/06/95
0 06/06/95
06/06/95
16,500
100
805 06 2539 / 8725
1590 S SANGAMON ST
42.0
06/06/95
06/06/95
0 06/06/95
06/06/95
31,500
100
805 06 2179 / 8365
1505 S UNION AVE
40.0
04/15/97
04/15/97
0 04/15/97
04/15/97
30,000
100
302 00 0070 / 5758
1520 S UNION AVE
0 04/04/97
04/15/97
14,507
100
302 00 0070 / 5758
1540 S UNION AVE
0 06/03/97
06/19/97
16,179
100
805 06 2158 / 8344
1562 S UNION AVE
46.0
06/19/97
06/19/97
0 06/19/97
06/19/97
34,500
100
805 06 2784 / 8970
1305 S WESTERN AVE
18.0
07/11/94
07/11/94
0 07/11/94
07/11/94
13,500
100
805 06 2783 / 8969
2400 S WESTERN AVE
30.0
05/23/94
05/23/94
0 05/23/94
05/23/94
22,500
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 265
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2782 / 8968
2405 S WESTERN AVE
34.0
06/06/94
06/06/94
0 06/06/94
06/06/94
25,500
100
805 06 2905 / 9091
999 W 16TH ST
10.0
12/19/93
12/19/93
0 12/19/93
12/19/93
7,500
100
805 06 2496 / 8682
410 W 23RD ST
51.0
09/25/95
09/25/95
0 09/25/95
09/25/95
38,250
100
805 06 2717 / 8903
2405 W 23RD ST
38.0
05/10/94
05/10/94
0 05/10/94
05/10/94
28,500
100
805 06 2338 / 8524
401 W 24TH ST
82.0
05/24/96
05/24/96
0 05/24/96
05/24/96
61,500
100
805 06 2952 / 9138
2440 W 26TH ST
12.0
03/20/94
03/20/94
0 03/20/94
03/20/94
9,000
100
805 06 2824 / 9010
121 W CERMAK RD
18.0
03/13/91
03/13/91
0 03/13/91
03/13/91
13,500
100
805 06 2328 / 8514
301 W CERMAK RD
22.0
01/01/91
01/01/91
0 01/01/91
01/01/91
16,500
100
302 00 0070 / 5758
400 W CERMAK RD
0 11/21/97
11/28/97
18,298
100
805 06 2129 / 8315
400 W CERMAK RD
0 11/28/97
11/28/97
25,500
100
302 00 0070 / 5758
430 W CERMAK RD
0 12/10/97
12/17/97
4,012
100
805 06 2130 / 8316
430 W CERMAK RD
26.0
12/17/97
12/17/97
0 12/17/97
12/17/97
19,500
100
805 06 2693 / 8879
499 W CERMAK RD
26.0
01/01/91
01/01/91
0 01/01/91
01/01/91
19,500
100
805 06 2718 / 8904
2405 W CERMAK RD
28.0
08/03/91
08/03/91
0 08/03/91
08/03/91
21,000
100
Totals per Underpass Lighting
34.0
2,357.0
11/28/97
11/28/97
31,814
1,429,379
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 266
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
S CLARK ST AND S ARCHER AVE
.50
0 09/10/01
09/10/01
4,472
100
210 06 0130 / 4389
S HALSTED ST AND S CANALPORT AVE
1.0
0 07/18/02
07/18/02
1,850
100
210 06 0130 / 4389
S HALSTED ST AND W 16TH ST
1.0
0 01/18/02
01/18/02
1,850
100
210 06 0219 / 4459
S WESTERN AVE AND S BLUE ISLAND AVE
1.0
05/05/05
05/06/05
10,563 03/18/05
03/18/05
9,406
100
210 06 0219 / 4459
S WESTERN AVE AND W 16TH ST
.50
03/10/05
03/11/05
5,282 04/28/05
04/28/05
4,004
100
210 06 0219 / 4459
S WESTERN AVE AND W 21ST ST
1.0
03/08/05
03/09/05
10,563 04/26/05
04/26/05
8,008
100
210 06 0219 / 4459
S WESTERN AVE AND W CERMAK RD
1.0
04/27/05
04/27/05
10,563 04/22/05
04/22/05
8,527
100
210 06 0219 / 4459
S WESTERN AVE AND W ROOSEVELT RD
.50
03/14/05
03/15/05
5,282 03/28/05
03/28/05
4,783
100
210 06 0130 / 4389
S WOLCOTT AVE AND S BLUE ISLAND AVE
1.0
0 09/16/02
09/16/02
9,306
100
210 06 0219 / 4459
W 23RD PL AND S WESTERN AVE
1.0
10,563 04/25/05
04/25/05
6,468
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 300 06 0225 / 5340
S LOOMIS ST AND W CERMAK RD
05/04/05
05/05/05
8.50
52,815
58,673
Locations 1.0
03/15/04
04/01/04
8,300 11/17/03
11/17/03
6,281
100
Work Type: Removal Temp Wiring - Signals
Crossings
300 06 0197 / 5322
W 14TH ST AND S BLUE ISLAND AVE
.50
2,000 09/11/01
09/12/01
1,328
100
300 06 0197 / 5322
W 21ST ST AND S WESTERN AVE
3.0
12,000 06/19/01
06/27/01
9,977
100
300 06 0197 / 5322
W CERMAK RD AND S LEAVITT ST
3.0
12,000 06/26/01
07/02/01
2,991
100
300 06 0197 / 5322
2190 W TAYLOR ST
1.0
8,000 11/13/01
11/13/01
10,685
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
2439 S OAKLEY AVE
7.50
34,000
24,981
Intersections 50.0
07/10/03
07/15/03
0 07/08/03 182,269
07/08/03
7,906 610,080
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 267
1/1/2008 AND 12/31/2008
Ward 25 Daniel S. Solis CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0020 / 4295
S BLUE ISLAND AVE AND W 16TH ST
05/18/00
07/15/00
82,500 05/18/00
09/25/00
95,886
100
814 06 0181 / 16393
339 E CERMAK RD
1.0
10/24/95
10/24/95
0 10/24/95
10/24/95
125,000
100
814 06 0327 / 16531
1726 N LA SALLE ST
1.0
01/01/96
01/01/96
0 01/01/96
04/15/97
5,500
100
814 06 0238 / 16450
2800 N WESTERN AVE
1.0
01/01/91
01/01/91
0 01/01/91
01/01/91
100,000
100
814 06 0233 / 16445
2451 S ASHLAND AVE
1.0
07/23/92
07/23/92
0 07/23/92
07/23/92
105,000
100
814 06 0347 / 16545
950 W ROOSEVELT RD
1.0
09/22/96
09/22/96
0 09/22/96
09/22/96
77,534
100
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
82,500
508,920
Locations
300 09 / 33091
ON S LAFLIN ST FROM W 17TH ST TO W 19TH ST
1.0
10/22/08
10/23/08
200 10/22/08
10/23/08
84
100
300 09 / 33068
ON S WESTERN AVE FROM W ARTHINGTON ST TO W MONROE ST
.95
06/02/08
06/20/08
264 04/01/08
12/01/08
0
100
300 11 / 32191
W HARRISON ST AND S MORGAN ST
1.0
11/14/08
12/16/08
1,250 11/14/08
12/16/08
910
100
300 11 / 32191
W HARRISON ST AND S RACINE AVE
1.0
11/14/08
12/16/08
2,940 11/14/08
12/16/08
2,325
100
3.95
4,654
3,319
Totals per Construction Phase
1,943,639
4,151,002
Totals for Ward 25
1,973,639
4,171,458
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 268
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32146
ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
1.0
11/01/07
11/30/07
0
0
0
300 06 / 32146
ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD
1.0
10/01/07
10/31/07
0
0
100
300 06 0308 / 5414
ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD
.0
02/01/06
07/31/06
300 06 0292 / 5399
1154 N CAMPBELL AVE
1.0
300 06 0292 / 5399
3227 W NORTH AVE
1.0
Totals per Design/Engineering
4.0
03/15/05
03/31/05
0 02/01/06
07/31/06
2,082
100
2,000 02/22/05
03/02/05
0
100
1,000 03/15/05
03/31/05
0
100
3,000
2,082
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 269
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0069 / 5233
ON N CHRISTIANA AVE FROM W GRAND AVE TO W DIVISION ST
300 11 / 32215
ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 07 0026 / 5449
ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 06 0069 / 5233
ON N HOMAN AVE FROM W GRAND AVE TO W DIVISION ST
300 06 0069 / 5233
ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE
300 07 0026 / 5449
Fixtures 8.0
01/25/03
01/25/03
.0
03/01/07
12/31/07
7.0
01/10/07
01/31/07
2,900 01/04/07
3,200 01/22/03
01/22/03
0
1,832
100
0
0
01/04/07
2,900
100
8.0
01/25/03
01/25/03
3,200 01/22/03
01/22/03
2,748
100
4.50
01/31/03
01/31/03
1,688 01/30/03
01/30/03
1,262
100
ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD
7.0
01/10/07
01/31/07
2,900 01/04/07
01/04/07
2,900
100
300 07 0026 / 5449
ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE
4.0
01/10/07
01/31/07
1,600 01/04/07
01/04/07
1,600
100
300 06 0069 / 5233
ON N SPAULDING AVE FROM W GRAND AVE TO W DIVISION ST
8.0
01/25/03
01/25/03
2,800 01/22/03
01/22/03
2,625
100
300 06 0069 / 5233
ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE
2.64
10/01/03
10/16/03
0 02/04/02
02/04/02
990
100
300 09 / 33067
ON W HADDON AVE FROM N ROCKWELL ST TO N CALIFORNIA AVE
3.50
06/16/08
06/20/08
1,400 06/16/08
06/20/08
879
100
300 11 / 32215
Materials ordered and entered into system 06/13/08 Note Last Updated on 12-JUN-08 ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE
.0
03/01/07
12/31/07
0
0
300 06 0069 / 5233
1500 N KEDZIE AVE
1.0
01/19/03
01/19/03
210 01/16/03
01/16/03
203
100
302 00 0092 / 5774
1500 N ROCKWELL AVE
2.0
01/18/02
01/18/02
425 01/16/02
01/16/02
406
100
302 00 0092 / 5774
1500 N ROCKWELL AVE
1.0
0 01/16/02
01/16/02
203
100
300 06 0069 / 5233
1257 N ROCKWELL ST
1.0
10/24/02
10/24/02
210 10/21/02
10/21/02
203
100
302 00 0092 / 5774
2100 N SPAULDING AVE
1.0
10/02/01
10/02/01
205 10/04/01
10/04/01
205
100
300 11 / 32215
3300 W BLOOMINGDALE AVE
5.0
08/01/07
08/10/07
2,200 08/18/07
08/18/07
2,200
100
300 11 / 32215
3236 W DIVISION ST
.0
03/01/07
12/31/07
302 00 0092 / 5774
3400 W PALMER ST
3.0
02/07/02
02/07/02
630 02/04/02
300 06 0069 / 5233
3400-3499 W PALMER ST
3.0
300 06 0069 / 5233
2601 W POTOMAC AVE
1.0
10/24/02
10/24/02
300 11 / 32190
2601 W POTOMAC AVE
.0
03/01/07
12/31/07
Totals per 250 Watt Changeout Totals per Lighting/Electrical
70.64
0
0
0
0
02/04/02
609
100
0 02/04/02
02/04/02
1,125
100
210 10/21/02
10/21/02
203
100
0
0
0
23,778
23,092
2,076,617
1,004,711
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 270
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0794 / 6980
2300 N ALBANY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0795 / 6981
2324 N ALBANY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0882 / 7068
2525 N BERNARD ST
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 0804 / 6990
817 N CALIFORNIA AVE
1.0
10/04/96
10/04/96
0 10/04/96
10/04/96
300
100
302 00 0092 / 5774
1223 N CALIFORNIA AVE
1.0
0 11/05/01
11/05/01
236
100
302 00 0092 / 5774
1247 N CALIFORNIA AVE
1.0
0 11/05/01
11/05/01
236
100
302 00 0092 / 5774
1457 N CALIFORNIA AVE
1.0
0 11/06/01
11/06/01
236
100
302 00 0092 / 5774
1400 N CAMPBELL AVE
1.0
0 07/19/01
07/19/01
236
100
805 06 0813 / 6999
2415 N CENTRAL PARK AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0816 / 7002
2445 N CENTRAL PARK AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0817 / 7003
2517 N CENTRAL PARK AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0769 / 6955
2525 N CENTRAL PARK AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 1000 / 7186
2545 N CENTRAL PARK AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0514 / 6700
2433 N DRAKE AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 1096 / 7282
2436 N DRAKE AVE
1.0
04/17/96
04/17/96
0 04/17/96
04/17/96
300
100
805 06 1069 / 7255
2457 N DRAKE AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0970 / 7156
2525 N DRAKE AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
805 06 0841 / 7027
2542 N DRAKE AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
805 06 1095 / 7281
2041 N HAMLIN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1218 / 7404
1600 N HUMBOLDT BLVD
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 1715 / 7901
1618 N KEDZIE AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1716 / 7902
1623 N KEDZIE AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1724 / 7910
1729 N KIMBALL AVE
1.0
06/20/97
06/20/97
0 06/20/97
06/20/97
300
100
805 06 1718 / 7904
1733 N KIMBALL AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 2014 / 8200
2116 N KIMBALL AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 2015 / 8201
2156 N KIMBALL AVE
1.0
07/12/96
07/12/96
0 07/12/96
07/12/96
300
100
302 00 0092 / 5774
1505 N MAPLEWOOD AVE
1.0
0 11/05/01
11/05/01
236
100
302 00 0092 / 5774
1516 N ROCKWELL AVE
1.0
0 11/05/01
11/05/01
236
100
805 06 1695 / 7881
1500 N ROCKWELL ST
1.0
0 07/07/97
07/07/97
300
100
302 00 0092 / 5774
854 N SACRAMENTO AVE
1.0
0 07/24/01
07/24/01
236
100
302 00 0092 / 5774
933 N SACRAMENTO AVE
1.0
0 12/10/01
12/10/01
236
100
07/07/97
07/07/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 271
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0690 / 6876
854 N SACRAMENTO BLVD
1.0
04/20/96
04/20/96
0 04/20/96
04/20/96
300
100
805 06 1719 / 7905
1830 N SAWYER AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1721 / 7907
1837 N SAWYER AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1722 / 7908
1850 N SAWYER AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 0408 / 6594
1940 N ST LOUIS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0409 / 6595
2403 N ST LOUIS AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0394 / 6580
2435 N ST LOUIS AVE
1.0
07/17/96
07/17/96
0 07/17/96
07/17/96
300
100
805 06 0411 / 6597
2457 N ST LOUIS AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0432 / 6618
2523 N ST LOUIS AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 0413 / 6599
2541 N ST LOUIS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 0414 / 6600
2559 N ST LOUIS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
302 00 0092 / 5774
2735 W AUGUSTA BLVD
1.0
0 10/19/01
10/19/01
236
100
805 06 1051 / 7237
3401 W DICKENS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 1062 / 7248
3402 W DICKENS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 1043 / 7229
3433 W DICKENS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 1024 / 7210
3533 W DICKENS AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
300 06 0139 / 5289
3236 W DIVISION ST
1,179.0
03/01/06
09/01/06
25,774 06/15/06
06/30/06
35,622
100
302 00 0092 / 5774
3236 W DIVISION ST
19.0
0 01/19/01
01/16/02
4,477
100
805 06 1678 / 7864
3115 W FULLERTON AVE
1.0
07/28/97
07/28/97
0 07/28/97
07/28/97
300
100
805 06 1751 / 7937
3153 W FULLERTON AVE
1.0
05/22/97
05/22/97
0 05/22/97
05/22/97
300
100
302 00 0092 / 5774
2519 W HADDON AVE
1.0
0 07/12/01
07/12/01
236
100
805 06 1154 / 7340
2602 W HADDON AVE
1.0
08/01/96
08/01/96
0 08/01/96
08/01/96
300
100
805 06 1691 / 7877
3710 W LE MOYNE ST
1.0
07/02/97
07/02/97
0 07/02/97
07/02/97
300
100
805 06 1692 / 7878
3722 W LE MOYNE ST
1.0
07/02/97
07/02/97
0 07/02/97
07/02/97
300
100
805 06 1694 / 7880
3741 W LE MOYNE ST
1.0
07/02/97
07/02/97
0 07/02/97
07/02/97
300
100
805 06 1837 / 8023
3503 W MC LEAN AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 1912 / 8098
2617 W NORTH AVE
1.0
10/18/95
10/18/95
0 10/18/95
10/18/95
300
100
805 06 1913 / 8099
2619 W NORTH AVE
1.0
10/18/95
10/18/95
0 10/18/95
10/18/95
300
100
302 00 0092 / 5774
1507 W OHIO ST
1.0
0 10/19/01
10/19/01
236
100
805 06 1712 / 7898
2101 W OHIO ST
1.0
06/18/97
06/18/97
0 06/18/97
06/18/97
300
100
805 06 0605 / 6791
3325 W PALMER ST
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 272
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0627 / 6813
3640 W PALMER ST
1.0
04/08/96
04/08/96
0 04/08/96
04/08/96
300
100
805 06 0624 / 6810
3435 W SHAKESPEARE AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 0645 / 6831
3533 W SHAKESPEARE AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 0399 / 6585
3248 W WABANSIA AVE
1.0
07/17/96
07/17/96
0 07/17/96
07/17/96
300
100
805 06 0466 / 6652
3503 W WRIGHTWOOD AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
805 06 0487 / 6673
3525 W WRIGHTWOOD AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
3236 W DIVISION ST
Work Type: Arterial Strt Lighting/Lamps 300 11 / 32190
2601 W POTOMAC AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
3236 W DIVISION ST
Work Type: Flood Light Install 300 06 0167 / 5306
824 N FAIRFIELD AVE
Work Type: Lighting Imprvmnts 300 06 0078 / 5241
3200 W PALMER ST
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
3227 W NORTH AVE
Work Type: Ornamental Lighting 300 11 / 32215
3236 W DIVISION ST
300 11 / 32190
2601 W POTOMAC AVE
Totals per Ornamental Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
3236 W DIVISION ST
1,264.0
25,774
59,195
Lamps 1,342.0
06/01/07
12/31/07
03/01/07
12/31/07
39,508 07/10/07
01/05/08
39,508
100
0
0
Blocks .0
0
Installations 1,247.0
0 05/18/02
05/21/02
22,706
100
0 12/09/99
12/09/99
188
100
Fixtures 2.0
Blocks 1.0
04/01/98
12/01/98
26,500 04/15/98
03/20/01
1,415
100
03/01/05
12/31/05
0 05/06/05
07/06/05
0
100
1.0
03/01/07
12/31/07
33,000
0
0
.0
03/01/07
12/31/07
0
0
0
33,000
0
0
0
Installations .0
Blocks
1.0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 273
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33092
ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
0
0
300 11 / 32215
ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
03/01/07
12/31/07
110,000
0
0
300 06 / 32146
ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
03/28/08
06/30/08
305,644
0
0
300 11 / 32219
Mozart from Augusta to Chicago is also under the same estimate Note Last Updated on 04-MAR-08 ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE 1.0 04/16/07
08/15/07
62,500 04/09/07
09/07/07
50,000
100
300 06 0298 / 5405
ON N MAPLEWOOD AVE FROM W DIVISION ST TO W HIRSCH ST
2.0
10/15/05
11/25/05
0 10/03/05
11/30/05
109,552
100
300 07 0026 / 5449
ON N MONTICELLO AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
04/18/06
11/18/06
170,000 01/03/07
05/04/07
133,415
100
300 06 / 32146
ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
12/05/07
06/23/08
305,644
0
0
300 06 0308 / 5414
Same project as Francisco Ave Note Last Updated on 04-MAR-08 ON N RICHMOND ST FROM W GRAND AVE TO W AUGUSTA BLVD
2.0
03/16/06
12/31/06
160,406 09/20/06
37,328
100
300 09 / 33092
ON N ROCKWELL ST FROM W CHICAGO AVE TO W GRAND AVE
4.0
0
0
300 09 / 33092
ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE
2.0
0
0
300 11 / 32215
ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE
2.0
03/01/07
12/31/07
110,000
0
0
300 11 / 32215
3236 W DIVISION ST
.0
03/01/07
12/31/07
0
0
0
300 11 / 32190
2601 W POTOMAC AVE
.0
03/01/07
12/31/07
0
0
0
1,524,194
330,295
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
130,000 04/01/08
12/01/08
04/20/07
40,000 130,000 04/01/08
25.0
12/01/08
Blocks
300 06 0232 / 5346
ON N MONTICELLO AVE FROM W NORTH AVE TO W WABANSIA AVE
2.0
11/04/02
01/03/03
132,000 11/06/02
12/27/02
116,966
100
300 06 0235 / 5349
ON W CRYSTAL ST FROM N KEDZIE AVE TO N HOMAN AVE
2.0
07/01/03
09/01/03
137,451 06/12/03
08/22/03
131,162
100
300 06 0267 / 5375
ON W SUPERIOR ST FROM N WESTERN AVE TO N ROCKWELL AVE
1.0
07/20/04
09/20/04
80,185 07/12/04
10/15/04
90,227
100
Totals per Residntl Strt Lighting/Lamps
5.0
349,636
338,355
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 274
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 11 / 32215
ON N FAIRFIELD AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 07 0026 / 5449
ON N FRANCISCO AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 04 0216 / 5114
ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE
300 07 0026 / 5449
ON N MOZART ST FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 07 0026 / 5449
ON N RIDGEWAY AVE FROM W CORTLAND ST TO W ARMITAGE AVE
302 00 0076 / 5764
ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE
300 04 0216 / 5114
ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST
300 11 / 32215
ON W HIRSCH ST FROM N HOMAN AVE TO N CENTRAL PARK AVE
302 00 0076 / 5764
ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE
300 11 / 32215 300 11 / 32190
.0
03/01/07
12/31/07
0
0
7.0
04/18/06
11/18/06
1,400 12/01/06
12/11/06
0
100
15.50
05/01/06
11/01/06
2,920 05/17/06
10/30/06
2,920
100
7.0
04/18/06
11/18/06
1,400 12/01/06
12/11/06
0
100
4.0
04/18/06
11/18/06
800 12/01/06
12/11/06
0
100
50.0
09/01/00
12/31/00
10.50
05/01/06
11/01/06
2,235
100
.0
03/01/07
12/31/07
0
0
0
5.67
09/01/00
12/31/00
0
96
3236 W DIVISION ST
.0
03/01/07
12/31/07
0
0
0
2601 W POTOMAC AVE
.0
03/01/07
12/31/07
0
0
0
8,755
6,101
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 300 06 0078 / 5241
1132 N ROCKWELL ST
Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
Locations
3236 W DIVISION ST
99.67
0
0 2,235 05/17/06
850 07/12/06
Blocks 1.0
04/01/98
12/01/98
6,300 04/13/98
04/23/98
4,685
100
06/01/06
12/31/06
10,000 10/19/06
10/23/06
8,923
100
Lamps 1,716.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 275
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0071 / 5759
1800 N ALBANY AVE
805 06 2770 / 8956
1805 N ALBANY AVE
805 06 2305 / 8491
1800 N CENTRAL PARK AVE
805 06 2750 / 8936
Fixtures 0 10/15/98
10/19/98
5,819
100
5.0
05/01/92
05/01/92
0 05/01/92
05/01/92
3,750
100
10.0
07/15/96
07/15/96
0 07/15/96
07/15/96
7,500
100
1801 N DRAKE AVE
6.0
06/21/94
06/21/94
0 06/21/94
06/21/94
4,500
100
302 00 0072 / 5760
1800 N KIMBALL AVE
1.0
0 03/15/00
04/27/00
23,466
100
805 06 2746 / 8932
1852 N KIMBALL AVE
24.0
01/01/91
01/01/91
0 01/01/91
01/01/91
18,000
100
805 06 2751 / 8937
1898 N MONTICELLO AVE
10.0
06/23/94
06/23/94
0 06/23/94
06/23/94
7,500
100
805 06 2771 / 8957
1801 N SAWYER AVE
6.0
01/01/90
01/01/90
0 01/01/90
01/01/90
4,500
100
805 06 2747 / 8933
1805 N SPAULDING AVE
10.0
06/16/94
06/16/94
0 06/16/94
06/16/94
7,500
100
805 06 2745 / 8931
1798 N ST LOUIS AVE
10.0
06/16/94
06/16/94
0 06/16/94
06/16/94
7,500
100
302 00 0070 / 5758
1800 N WHIPPLE ST
0 09/10/97
09/15/97
4,233
100
805 06 2101 / 8287
1800 N WHIPPLE ST
10.0
09/15/97
09/15/97
0 09/15/97
09/15/97
7,500
100
805 06 2769 / 8955
3000 W BLOOMINGDALE AVE
12.0
08/11/94
08/11/94
0 08/11/94
08/11/94
9,000
100
805 06 2773 / 8959
3200 W BLOOMINGDALE AVE
6.0
06/29/94
06/29/94
0 06/29/94
06/29/94
4,500
100
805 06 2922 / 9108
3405 W DIVISION ST
12.0
02/28/94
02/28/94
0 02/28/94
02/28/94
9,000
100
300 06 0217 / 5337
2009 W GRAND AVE
519.0
01/07/04
01/19/04
29,172 01/05/04
01/15/04
29,480
100
805 06 2653 / 8839
3685 W NORTH AVE
10.0
06/04/93
06/04/93
0 06/04/93
06/04/93
7,500
100
805 06 2652 / 8838
3570 W POTOMAC AVE
12.0
12/02/94
12/02/94
0 12/02/94
12/02/94
9,000
100
Totals per Underpass Lighting
663.0
29,172
170,248
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 276
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N HAMLIN AVE AND W ARMITAGE AVE
1.0
0 09/23/02
09/23/02
1,850
100
210 06 0130 / 4389
N HUMBOLDT BLVD AND W DIVISION ST
1.0
0 12/07/01
12/07/01
8,539
100
210 06 0130 / 4389
N KEDZIE AVE AND W DIVISION ST
1.0
0 12/04/01
12/04/01
8,539
100
210 06 0219 / 4459
N WESTERN AVE AND W DIVISION ST
.50
03/28/05
03/29/05
5,282 03/16/05
03/16/05
5,042
100
210 06 0219 / 4459
N WESTERN AVE AND W POTOMAC AVE
.50
03/29/05
03/30/05
5,282 03/08/05
03/08/05
3,824
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0029 / 4303
2400 N KIMBALL AVE
Work Type: New Signal 300 11 / 32190
2601 W POTOMAC AVE
Work Type: Removal Temp Wiring - Signals
4.0
10,563
27,794
Locations 1.0
03/01/00
05/31/00
03/01/07
12/31/07
86,000 03/01/00
05/30/00
124,383
100
0
0
Locations .0
0
Crossings
300 06 0197 / 5322
N CALIFORNIA AVE AND W HIRSCH ST
1.0
4,000 01/03/02
01/04/02
3,671
100
300 06 0197 / 5322
N KIMBALL AVE AND W ARMITAGE AVE
.50
2,000 10/02/01
10/02/01
178
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
3236 W DIVISION ST
Work Type: TSM Install
1.50
6,000
3,849
Intersections 34.0
11/15/03
11/21/03
0 11/12/03
11/19/03
5,376
100
Locations
300 06 0199 / 5324
N WESTERN AVE AND W POTOMAC AVE
.50
9,573 02/26/01
04/27/01
79,240
100
210 06 0028 / 4302
2400 N ALBANY AVE
1.0
07/15/98
09/30/98
175,000 12/15/98
02/15/99
127,277
100
814 06 0155 / 16369
1000 N CALIFORNIA AVE
1.0
02/05/93
02/05/93
0 02/05/93
02/05/93
76,127
100
814 06 0365 / 16556
1015 N HUMBOLDT DR
1.0
01/01/96
01/01/96
0 01/01/96
02/10/98
14,689
100
814 06 0366 / 16557
999 N SACRAMENTO BLVD
1.0
01/01/96
01/01/96
0 01/01/96
02/10/98
200,613
100
4.50
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 11 / 32190 Totals per Traffic
2601 W POTOMAC AVE
184,573
497,946
0
0
287,136
659,347
Locations .0
03/01/07
12/31/07
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 277
1/1/2008 AND 12/31/2008
Ward 26 Billy Ocasio CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Totals per Construction Phase
2,363,752
1,664,058
Totals for Ward 26
2,366,752
1,666,140
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 278
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0290 / 5397
CABRINI GREEN EXTENSION
.0
02/01/05
06/01/05
28,000 02/01/05
300 06 / 32453
FRANCIS CABRINI HOMES
.0
04/02/07
12/31/07
51,000 12/01/07
300 06 0211 / 5334
HENRY HORNER HOMES
.0
11/07/01
08/20/02
0 11/07/01
300 06 / 32277
ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE
1.0
04/01/08
08/30/08
65,000 05/06/08
300 06 / 32146
ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE
1.0
11/01/07
11/30/07
300 06 / 32277
ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE
1.50
04/01/08
08/30/08
300 06 / 32277
ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE
1.50
04/01/08
08/30/08
300 06 / 32146
ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE
1.0
05/01/07
10/31/07
300 06 0308 / 5414
ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE
.0
02/01/06
07/31/06
0 02/01/06
210 06 0243 / 4480
N ASHLAND AVE AND W CHICAGO AVE
.0
12/27/06
01/26/07
250 12/27/06
210 06 0240 / 4477
W NORTH AVE AND N SEDGWICK ST
.0
10/10/05
07/31/06
600 10/10/05
300 11 / 32232
W NORTH AVE AND N WELLS ST
1.0
06/01/07
12/31/07
300 06 0292 / 5399
327 N ADA ST
1.0
02/22/05
03/04/05
300 06 0314 / 5420
200-300 N WOLCOTT AVE
.0
04/01/06
12/31/06
300 06 0282 / 5390
650 W MADISON ST
1.0
09/29/04
10/21/04
1,000 05/01/04
300 06 0292 / 5399
536 W SCOTT ST
1.0
02/10/05
05/26/05
2,000 02/10/05
300 06 0314 / 5420
1800-1900 W WASHINGTON BLVD
.0
04/01/06
12/31/06
Totals per Design/Engineering
10.0
10/18/06
08/20/02
8,100
100
2,200
10
6,670
100
0
20
0
100
97,000 05/06/08
0
20
97,000 05/06/08
0
20
0
100
07/31/06
274
100
01/26/07
638
100
08/08/06
125
100
1,506
100
742
100
0
0
0 6,000 10/07/04
03/14/05
0
0
0
10/21/04
832
100
05/26/05
607
100
0
0
0
347,850
21,693
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 279
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON N HAMLIN AVE FROM W CHICAGO AVE TO W DIVISION ST
16.0
05/02/02
05/02/02
3,360 04/30/02
04/30/02
3,248
100
300 06 0069 / 5233
ON N HARDING AVE FROM W CHICAGO AVE TO W DIVISION ST
16.0
05/02/02
05/02/02
3,360 04/30/02
04/30/02
3,248
100
302 00 0092 / 5774
ON N LAWNDALE AVE FROM W CHICAGO AVE TO W IOWA ST
5.0
09/13/01
09/13/01
1,029 09/28/01
09/28/01
1,029
100
300 06 0069 / 5233
ON N LAWNDALE AVE FROM W DIVISION ST TO W POTOMAC AVE
4.50
01/31/03
01/31/03
1,688 01/30/03
01/30/03
1,262
100
300 06 0069 / 5233
ON N SPRINGFIELD AVE FROM W CHICAGO AVE TO W DIVISION ST
16.0
05/02/02
05/02/02
3,360 04/30/02
04/30/02
3,248
100
300 06 0069 / 5233
1200 N AVERS AVE
5.0
0 06/04/02
06/04/02
1,875
100
300 06 / 32496
500 N DRAKE AVE
5.0
3,200 08/18/07
08/18/07
170
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 07 0042 / 5465
ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST
300 06 0225 / 5340
1901 W MADISON ST
Totals per 400 Watt Changeout Totals per Lighting/Electrical
08/01/07
08/10/07
67.50
15,997
14,080
Fixtures 6.50
01/10/07
01/31/07
124.0
11/15/03
11/30/03
130.50
2,600 49,600 11/13/03
12/08/03
2,600
100
27,325
100
52,200
29,925
3,914,688
2,696,656
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 280
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1500 / 7686
405 N ABERDEEN ST
1.0
11/15/97
11/15/97
0 11/15/97
11/15/97
300
100
805 06 1493 / 7679
431 N ABERDEEN ST
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
805 06 1495 / 7681
439 N ABERDEEN ST
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
302 00 0092 / 5774
614 N ADA ST
1.0
0 10/19/01
10/19/01
236
100
805 06 1491 / 7677
405 N CARPENTER ST
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
805 06 1494 / 7680
431 N CARPENTER ST
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
805 06 1496 / 7682
439 N CARPENTER ST
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
302 00 0092 / 5774
346 N JUSTINE ST
1.0
0 06/11/01
06/11/01
236
100
302 00 0092 / 5774
614 N MAY ST
1.0
0 09/28/01
09/28/01
236
100
805 06 0662 / 6848
1126 N RIDGEWAY AVE
1.0
0 05/17/96
05/17/96
300
100
302 00 0092 / 5774
1538 W AUGUSTA BLVD
1.0
0 05/13/01
05/13/01
236
100
805 06 0831 / 7017
3030 W CARROLL AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 0832 / 7018
3052 W CARROLL AVE
1.0
10/11/96
10/11/96
0 10/11/96
10/11/96
300
100
300 06 0139 / 5289
1463 W CHICAGO AVE
1,392.0
03/01/06
09/01/06
30,385 06/12/06
06/27/06
42,058
100
302 00 0092 / 5774
1463 W CHICAGO AVE
21.0
0 02/05/01
01/17/02
4,949
100
805 06 1599 / 7785
1401 W CORTEZ ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1600 / 7786
1417 W CORTEZ ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1601 / 7787
1440 W CORTEZ ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1534 / 7720
1455 W CORTEZ ST
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 1102 / 7288
1801 W FULTON ST
1.0
09/10/96
09/10/96
0 09/10/96
09/10/96
300
100
302 00 0092 / 5774
1354 W GRAND AVE
1.0
0 10/19/01
10/19/01
236
100
805 06 1237 / 7423
2119 W HUBBARD ST
1.0
0 04/03/96
04/03/96
300
100
302 00 0092 / 5774
1243 W OHIO ST
1.0
0 10/19/01
10/19/01
236
100
805 06 1470 / 7656
4028 W POTOMAC AVE
1.0
12/04/97
12/04/97
0 12/04/97
12/04/97
300
100
805 06 0499 / 6685
1716 W WASHINGTON BLVD
1.0
10/23/96
10/23/96
0 10/23/96
10/23/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
1463 W CHICAGO AVE
05/17/96
04/03/96
05/17/96
04/03/96
1,436.0
30,385
53,523
Lamps 3,228.0
06/01/07
12/31/07
95,032 07/10/07
09/01/07
95,032
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 281
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
Installations
1463 W CHICAGO AVE
3,133.0
0 06/20/02
06/23/02
57,046
100
Fixtures
Work Type: Flood Light Install 300 06 0198 / 5323
CABRINI GREEN EXTENSION
03/02/01
04/17/01
72,500 04/05/01
04/13/01
51,244
100
300 06 0198 / 5323
HENRY HORNER HOMES
01/16/01
03/14/01
60,625 03/09/01
03/14/01
49,839
100
300 06 0198 / 5323
WILLIAM GREEN HOMES
03/02/01
04/24/01
42,500 04/05/01
04/14/01
12,814
100
300 11 / 32216
ON N SAWYER AVE FROM W OHIO ST TO W HURON ST
10/05/07
10/05/07
1,200 10/05/07
10/05/07
586
100
300 06 0167 / 5306
ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST
1.60
0 09/23/99
09/23/99
263
100
300 06 0167 / 5306
825 N CARPENTER ST
1.0
0 01/07/99
01/07/99
351
100
300 06 0167 / 5306
1000 N NOBLE ST
2.0
0 01/09/99
01/09/99
702
100
300 06 0069 / 5233
1400 N ORLEANS ST
4.0
11/20/02
11/20/02
1,940 11/18/02
11/18/02
1,918
100
300 11 / 32216
600-700 N SAWYER AVE
2.0
10/05/07
10/15/07
1,000 10/10/07
10/10/07
586
100
302 00 0092 / 5774
100 S RACINE AVE
1.0
0 10/17/01
10/17/01
404
100
300 11 / 32216
1463 W CHICAGO AVE
1.0
300 06 0071 / 5234
618 W SCOTT ST
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0290 / 5397
CABRINI GREEN EXTENSION
300 06 0211 / 5334
no funding found in jcs. Note Last Updated on 29-JAN-08 HENRY HORNER HOMES
300 06 0292 / 5399
327 N ADA ST
300 06 0282 / 5390
650 W MADISON ST
300 06 0292 / 5399
536 W SCOTT ST
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts 300 06 / 32453
FRANCIS CABRINI HOMES
2.0
09/01/07
09/10/07
1,250 07/10/07
07/10/07
293
100
01/01/00
07/01/00
400,000 03/30/00
06/15/00
91,430
100
14.60
581,015
210,430
Installations .0
07/01/05
07/31/07
286,000 10/26/06
10/26/07
0
100
34.0
11/15/02
05/31/04
351,574 10/07/02
01/20/05
360,632
100
.0
03/18/05
12/31/05
6,000 01/22/06
12/31/05
7,592
100
70,000 10/08/04
11/08/04
74,690
100
0 07/28/05
08/05/05
0
100
1.0 .0
03/01/05
12/31/05
35.0
713,574
442,914
510,000
0
Projects .0
04/02/07
12/21/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 282
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 09 / 33093
ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE
300 06 0225 / 5340
1901 W MADISON ST
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
1463 W CHICAGO AVE
Work Type: Residntl Staggered Lighting
Fixtures 2.0 17.0
01/01/04
01/10/04
19.0
65,646 04/01/08
12/01/08
0
0
20,400 12/30/03
01/02/04
19,657
100
86,046
19,657
0
Lamps .0
03/01/08
12/01/08
0
Blocks
300 06 / 32277
ON N AVERS AVE FROM W DIVISION ST TO W GRAND AVE
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON N DRAKE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
11/01/05
12/15/05
0 08/22/05
300 06 / 32146
ON N DRAKE AVE FROM W OHIO ST TO W CHICAGO AVE
4.0
12/07/07
05/29/08
381,586 01/02/08
300 09 / 33093
ON N HARDING AVE FROM W AUGUSTA BLVD TO W CHICAGO AVE
2.0
300 06 / 32277
ON N HARDING AVE FROM W DIVISION ST TO W GRAND AVE
300 11 / 32216
ON N KEYSTONE AVE FROM W THOMAS ST TO W DIVISION ST
300 06 / 32277
ON N SPRINGFIELD AVE FROM W DIVISION ST TO W GRAND AVE
300 09 / 33093
ON N ST LOUIS AVE FROM W AUGUSTA BLVD TO W THOMAS ST
1.0
300 06 / 32146
ON N ST LOUIS AVE FROM W OHIO ST TO W CHICAGO AVE
2.0
300 09 / 33093
ON W HURON ST FROM N HARDING AVE TO N HAMLIN AVE
2.0
300 06 0308 / 5414
ON W MAYPOLE AVE FROM N CALIFORNIA AVE TO N TALMAN AVE
1.0
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
64,353 04/01/08
.0
05/04/08
12/31/08
1.0
02/15/08
04/04/08
.0
05/04/08
12/31/08
12/06/07
06/23/08
07/31/06
09/22/06
15.0
11/11/05
12/01/08
0 60,000 02/18/08
04/25/08
0 65,000 04/01/08
12/01/08
381,586
0
0
110,151
100
0
50
0
0
0
0
48,598
100
0
0
0
0
0
50
97,500 04/01/08
12/01/08
0
0
70,814 07/25/06
03/23/07
40,204
100
1,120,839
198,953
Blocks
300 06 0267 / 5375
ON W ERIE ST FROM N PULASKI RD TO N HARDING AVE
302 00 0092 / 5774
ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST
300 06 0235 / 5349
ON W HURON ST FROM N NOBLE ST TO N ASHLAND AVE
2.0
10/01/03
300 06 0267 / 5375
ON W HURON ST FROM N PULASKI RD TO N HARDING AVE
1.0
300 06 0314 / 5420
200-300 N WOLCOTT AVE
300 06 0314 / 5420
1800-1900 W WASHINGTON BLVD
Totals per Residntl Strt Lighting/Lamps
0
1.0
10/01/04
11/15/04
48,436 10/05/04
11/05/04
37,593
100
41,000 08/13/01
09/07/01
40,581
100
11/15/03
168,587 10/02/03
11/07/03
153,357
100
09/20/04
11/20/04
48,436 10/05/04
11/05/04
37,594
100
.0
10/15/06
09/30/08
89,000 07/19/07
08/12/08
88,176
100
.0
10/15/06
09/30/08
89,000 07/19/07
08/12/07
88,176
100
08/13/01
4.0
484,459
445,477
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 283
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
1413 N WIELAND ST
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1425 N WIELAND ST
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1449 N WIELAND ST
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1505 N WIELAND ST
1.0
0 03/23/01
03/23/01
378
100
302 00 0092 / 5774
1507 N WIELAND ST
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1515 N WIELAND ST
1.0
0 01/31/01
01/31/01
378
100
302 00 0092 / 5774
1529 N WIELAND ST
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
3800 W FERDINAND ST
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
3807 W FERDINAND ST
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
3817 W FERDINAND ST
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
3832 W FERDINAND ST
1.0
0 02/13/01
02/13/01
378
100
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
11.0
0
4,158
Locations
300 11 / 32191
ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST
3.57
11/14/08
12/15/08
893 11/14/08
12/15/08
714
100
300 09 / 33109
ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE
4.20
05/19/08
06/20/08
840 04/01/08
12/01/08
504
100
300 04 0216 / 5114
ON N PULASKI RD FROM W DIVISION ST TO W GRAND AVE
24.0
05/01/06
11/01/06
5,119 05/17/06
07/24/06
5,119
100
300 11 / 32191
ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST
1.56
11/14/08
12/16/08
390 11/14/08
12/16/08
312
100
300 04 0216 / 5114
ON W GRAND AVE FROM N ASHLAND AVE TO N NOBLE ST
10.50
05/01/06
11/01/06
2,235 05/17/06
07/12/06
2,235
100
300 07 0042 / 5465
ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST
6.50
04/18/06
11/18/06
1,625 08/14/06
09/01/06
1,283
100
302 00 0076 / 5764
ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE
61.50
09/01/00
12/31/00
300 06 0225 / 5340
1901 W MADISON ST
130.0
10/15/03
11/06/03
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 303 00 0006 / 5783
200 N ASHLAND AVE
300 06 0078 / 5241
800 N SPRINGFIELD AVE
300 06 0076 / 5239
300 W CHICAGO AVE
Totals per Strt Lighting
241.83
0 43,050 10/13/03
1,046 11/10/03
54,152
43,000
100
54,213
Blocks 1.0
1.0
08/01/97
12/01/97
60,000 08/01/97
04/30/98
76,547
100
10/01/00
02/01/01
6,300 05/15/98
05/26/98
0
100
03/19/01
05/19/01
58,500 03/02/01
03/20/01
0
100
124,800
76,547
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 284
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping
Lamps
300 06 0139 / 5289
1463 W CHICAGO AVE
1,981.0
03/01/04
12/01/04
21,190 10/02/06
10/12/06
21,573
100
300 06 0238 / 5352
1463 W CHICAGO AVE
2,103.0
06/01/06
12/31/06
25,000 10/02/06
10/12/06
22,902
100
Totals per Traffic Signal Regrouping
4,084.0
46,190
44,475
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 285
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2690 / 8876
200 N ABERDEEN ST
2.0
12/31/93
12/31/93
0 12/31/93
12/31/93
1,500
100
805 06 2956 / 9142
425 N ABERDEEN ST
12.0
02/15/94
02/15/94
0 02/15/94
02/15/94
9,000
100
805 06 2716 / 8902
198 N ADA ST
2.0
12/31/93
12/31/93
0 12/31/93
12/31/93
1,500
100
805 06 2351 / 8537
428 N ADA ST
14.0
08/26/94
08/26/94
0 08/26/94
08/26/94
10,500
100
805 06 2714 / 8900
205 N ARTESIAN AVE
2.0
12/31/93
12/31/93
0 12/31/93
12/31/93
1,500
100
805 06 2713 / 8899
198 N ASHLAND AVE
2.0
12/31/93
12/31/93
0 12/31/93
12/31/93
1,500
100
805 06 2197 / 8383
385 N ASHLAND AVE
26.0
01/05/94
01/05/94
0 01/05/94
01/05/94
19,500
100
805 06 2753 / 8939
435 N CARPENTER ST
14.0
02/10/94
02/10/94
0 02/10/94
02/10/94
10,500
100
805 06 2760 / 8946
385 N DAMEN AVE
26.0
08/04/93
08/04/93
0 08/04/93
08/04/93
19,500
100
805 06 2907 / 9093
430 N DESPLAINES ST
14.0
12/01/93
12/01/93
0 12/01/93
12/01/93
10,500
100
302 00 0070 / 5758
420 N ELIZABETH ST
0 02/07/97
02/14/97
6,482
100
805 06 2289 / 8475
900 N ELSTON AVE
26.0
08/28/96
08/28/96
0 08/28/96
08/28/96
19,500
100
805 06 2926 / 9112
640 N GREEN ST
18.0
11/24/93
11/24/93
0 11/24/93
11/24/93
13,500
100
805 06 2565 / 8751
430 N HALSTED ST
30.0
02/05/91
02/05/91
0 02/05/91
02/05/91
22,500
100
805 06 2761 / 8947
498 N HAMLIN AVE
12.0
05/06/94
05/06/94
0 05/06/94
05/06/94
9,000
100
805 06 2756 / 8942
339 N HOYNE AVE
34.0
05/14/93
05/14/93
0 05/14/93
05/14/93
25,500
100
805 06 2758 / 8944
339 N LEAVITT ST
22.0
05/03/93
05/03/93
0 05/03/93
05/03/93
16,500
100
805 06 2390 / 8576
808 N LESSING ST
15.0
01/24/96
01/24/96
0 01/24/96
01/24/96
11,250
100
805 06 2213 / 8399
430 N MAY ST
14.0
01/02/92
01/02/92
0 01/02/92
01/02/92
10,500
100
805 06 2174 / 8360
450 N MILWAUKEE AVE
17.0
12/31/95
12/31/95
0 12/31/95
12/31/95
12,750
100
805 06 2176 / 8362
450 N MILWAUKEE AVE
32.0
04/20/97
04/20/97
0 04/20/97
04/20/97
24,000
100
805 06 2200 / 8386
450 N MILWAUKEE AVE
17.0
12/31/95
12/31/95
0 12/31/95
12/31/95
12,750
100
805 06 2175 / 8361
455 N MILWAUKEE AVE
17.0
12/31/94
12/31/94
0 12/31/94
12/31/94
12,750
100
805 06 2173 / 8359
460 N MILWAUKEE AVE
17.0
12/31/94
12/31/94
0 12/31/94
12/31/94
12,750
100
302 00 0070 / 5758
700 N MILWAUKEE AVE
0 04/13/97
04/20/97
22,746
100
805 06 2400 / 8586
420 N MORGAN ST
14.0
02/22/94
02/22/94
0 02/22/94
02/22/94
10,500
100
805 06 2759 / 8945
389 N OAKLEY BLVD
22.0
06/03/94
06/03/94
0 06/03/94
06/03/94
16,500
100
805 06 2353 / 8539
398 N OGDEN AVE
34.0
07/19/93
07/19/93
0 07/19/93
07/19/93
25,500
100
805 06 2350 / 8536
430 N OGDEN AVE
16.0
07/19/93
07/19/93
0 07/19/93
07/19/93
12,000
100
805 06 2522 / 8708
389 N PAULINA ST
14.0
05/14/93
05/14/93
0 05/14/93
05/14/93
10,500
100
805 06 2562 / 8748
429 N PEORIA ST
16.0
04/19/95
04/19/95
0 04/19/95
04/19/95
12,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 286
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2534 / 8720
405 N PULASKI RD
12.0
04/07/95
04/07/95
0 04/07/95
04/07/95
9,000
100
805 06 2535 / 8721
405 N PULASKI RD
4.0
04/07/95
04/07/95
0 04/07/95
04/07/95
3,000
100
805 06 2536 / 8722
405 N PULASKI RD
8.0
04/07/95
04/07/95
0 04/07/95
04/07/95
6,000
100
805 06 2558 / 8744
405 N PULASKI RD
8.0
04/07/95
04/07/95
0 04/07/95
04/07/95
6,000
100
302 00 0071 / 5759
420 N RACINE AVE
0 01/27/99
02/05/99
15,129
100
805 06 2187 / 8373
430 N RACINE AVE
10.0
01/23/92
01/23/92
0 01/23/92
01/23/92
7,500
100
805 06 2252 / 8438
948 N RACINE AVE
14.0
10/16/96
10/16/96
0 10/16/96
10/16/96
10,500
100
805 06 2777 / 8963
345 N SACRAMENTO BLVD
22.0
04/21/94
04/21/94
0 04/21/94
04/21/94
16,500
100
805 06 2224 / 8410
798 N SACRAMENTO BLVD
14.0
12/30/96
12/30/96
0 12/30/96
12/30/96
10,500
100
805 06 2230 / 8416
798 N SACRAMENTO BLVD
11.0
12/30/96
12/30/96
0 12/30/96
12/30/96
8,250
100
805 06 2231 / 8417
798 N SACRAMENTO BLVD
8.0
12/30/96
12/30/96
0 12/30/96
12/30/96
6,000
100
805 06 2265 / 8451
799 N SACRAMENTO BLVD
6.0
12/30/96
12/30/96
0 12/30/96
12/30/96
4,500
100
805 06 2529 / 8715
430 N SANGAMON ST
14.0
01/02/92
01/02/92
0 01/02/92
01/02/92
10,500
100
805 06 2537 / 8723
850 N SANGAMON ST
30.0
05/31/95
05/31/95
0 05/31/95
05/31/95
22,500
100
805 06 2532 / 8718
890 N SANGAMON ST
24.0
06/04/95
06/04/95
0 06/04/95
06/04/95
18,000
100
805 06 2778 / 8964
998 N SPAULDING AVE
16.0
06/01/94
06/01/94
0 06/01/94
06/01/94
12,000
100
805 06 2215 / 8401
501 N UNION AVE
18.0
12/09/96
12/09/96
0 12/09/96
12/09/96
13,500
100
805 06 2355 / 8541
388 N WESTERN AVE
28.0
08/04/93
08/04/93
0 08/04/93
08/04/93
21,000
100
805 06 2541 / 8727
370 N WOLCOTT AVE
34.0
05/25/95
05/25/95
0 05/25/95
05/25/95
25,500
100
805 06 2523 / 8709
388 N WOOD ST
22.0
05/01/95
05/01/95
0 05/01/95
05/01/95
16,500
100
805 06 2590 / 8776
1029 S CENTRAL PARK AVE
20.0
08/01/93
08/01/93
0 08/01/93
08/01/93
15,000
100
805 06 2731 / 8917
819 W ANCONA ST
4.0
06/01/94
06/01/94
0 06/01/94
06/01/94
3,000
100
805 06 2216 / 8402
1212 W AUGUSTA BLVD
30.0
12/09/96
12/09/96
0 12/09/96
12/09/96
22,500
100
805 06 2315 / 8501
3301 W AUGUSTA BLVD
24.0
05/23/96
05/23/96
0 05/23/96
05/23/96
18,000
100
805 06 2317 / 8503
3301 W AUGUSTA BLVD
24.0
05/23/96
05/23/96
0 05/23/96
05/23/96
18,000
100
805 06 2406 / 8592
3305 W AUGUSTA BLVD
24.0
05/23/96
05/23/96
0 05/23/96
05/23/96
18,000
100
805 06 2405 / 8591
3310 W AUGUSTA BLVD
24.0
05/23/96
05/23/96
0 05/23/96
05/23/96
18,000
100
805 06 2381 / 8567
950 W CHICAGO AVE
17.0
01/24/96
01/24/96
0 01/24/96
01/24/96
12,750
100
805 06 2225 / 8411
3100 W CHICAGO AVE
24.0
06/16/94
06/16/94
0 06/16/94
06/16/94
18,000
100
805 06 2937 / 9123
2535 W FULTON ST
12.0
06/29/93
06/29/93
0 06/29/93
06/29/93
9,000
100
805 06 2938 / 9124
2625 W FULTON ST
12.0
07/01/93
07/01/93
0 07/01/93
07/01/93
9,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 287
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2211 / 8397
663 W GRAND AVE
4.0
02/10/97
02/10/97
0 02/10/97
02/10/97
3,000
100
805 06 2212 / 8398
663 W GRAND AVE
4.0
12/31/95
12/31/95
0 12/31/95
12/31/95
3,000
100
805 06 2205 / 8391
664 W GRAND AVE
18.0
02/10/97
02/10/97
0 02/10/97
02/10/97
13,500
100
302 00 0070 / 5758
700 W GRAND AVE
0 02/01/97
02/10/97
15,559
100
805 06 2210 / 8396
3359 W GRAND AVE
0 12/31/95
12/31/95
7,500
100
302 00 0070 / 5758
3400 W GRAND AVE
0 12/01/97
12/08/97
15,811
100
805 06 2143 / 8329
3400 W GRAND AVE
16.0
12/08/97
12/08/97
0 12/08/97
12/08/97
12,000
100
805 06 2613 / 8799
1029 W HUBBARD ST
3.0
11/30/94
11/30/94
0 11/30/94
11/30/94
2,250
100
805 06 2301 / 8487
870 W HURON ST
14.0
11/16/93
11/16/93
0 11/16/93
11/16/93
10,500
100
805 06 2106 / 8292
1401 W KINZIE ST
8.0
12/12/95
12/12/95
0 12/12/95
12/12/95
6,000
100
805 06 2408 / 8594
2623 W LAKE ST
12.0
01/05/96
01/05/96
0 01/05/96
01/05/96
9,000
100
805 06 2314 / 8500
2630 W LAKE ST
12.0
01/05/96
01/05/96
0 01/05/96
01/05/96
9,000
100
805 06 2318 / 8504
2633 W LAKE ST
12.0
01/05/96
01/05/96
0 01/05/96
01/05/96
9,000
100
805 06 2407 / 8593
2633 W LAKE ST
12.0
01/05/96
01/05/96
0 01/05/96
01/05/96
9,000
100
805 06 2581 / 8767
701 W OHIO ST
8.0
03/08/95
03/08/95
0 03/08/95
03/08/95
6,000
100
805 06 2730 / 8916
833 W SUPERIOR ST
14.0
08/08/94
08/08/94
0 08/08/94
08/08/94
10,500
100
Totals per Underpass Lighting
10.0
1,166.0
12/31/95
12/31/95
0
950,227
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 288
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 210 06 0022 / 4297
1444 W AUGUSTA BLVD
Work Type: LED Signal Head Install
Locations 1.0
01/15/02
01/25/02
23,000 01/09/02
01/11/02
16,907
100
Locations
210 06 0130 / 4389
N HAMLIN AVE AND W DIVISION ST
1.0
0 12/04/01
12/04/01
8,539
100
210 06 0130 / 4389
N HOMAN AVE AND W FRANKLIN BLVD
.50
0 05/02/02
05/02/02
4,270
100
210 06 0130 / 4389
N ORLEANS ST AND W CHICAGO AVE
.50
0 04/12/02
04/12/02
3,953
100
210 06 0130 / 4389
N WELLS ST AND W CHICAGO AVE
.50
0 04/10/02
04/10/02
4,270
100
210 06 0219 / 4459
N WESTERN AVE AND W LAKE ST
.50
03/24/05
03/25/05
5,282 03/01/05
03/01/05
4,365
100
300 06 0251 / 5361
W CHICAGO AVE AND N HALSTED ST
1.0
06/01/06
07/01/06
30,500 07/01/06
07/26/06
10,484
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
4.0
35,782
35,880
Locations
210 06 0231 / 4470
W GRAND AVE AND N HALSTED ST
.0
03/01/08
12/01/08
0
0
0
210 06 0231 / 4470
W GRAND AVE AND N MILWAUKEE AVE
.0
03/01/08
12/01/08
0
0
0
0
0
Totals per Left Turn Arrow
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
N ASHLAND AVE AND W CHICAGO AVE
210 06 0240 / 4477 300 11 / 32232
03/15/06
05/08/07
10713013 Note Last Updated on 03-APR-08 W NORTH AVE AND N SEDGWICK ST
4.0
11/01/05
W NORTH AVE AND N WELLS ST
1.0
07/25/07
Work Type: Pedestrian Countdown Signal Installation Totals per Traffic
Locations .0
Totals per Pedestrian Countdown Signal Install
300 11 / 32600
.0
W NORTH AVE AND N WELLS ST
6,000 01/26/07
02/09/07
2,994
100
09/30/06
5,000 11/01/05
10/16/06
2,979
100
10/31/07
12,000 08/01/07
08/02/07
5,776
100
5.0
23,000
11,749
Installations 1.0
09/08/07
01/04/08
11,520 08/01/07 272,097
08/02/07
0 1,249,534
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 289
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Removal Temp Wiring - Signals
Crossings
300 06 0197 / 5322
N CALIFORNIA AVE AND W LAKE ST
.50
2,000 07/18/01
04/08/02
1,285
100
300 06 0197 / 5322
N HAMLIN AVE AND W DIVISION ST
3.0
12,000 04/08/02
04/08/02
0
100
300 06 0197 / 5322
N LARRABEE ST AND W DIVISION ST
1.0
4,000 07/26/01
07/31/01
11,590
100
300 06 0197 / 5322
N MILWAUKEE AVE AND W ERIE ST
1.0
4,000 07/25/01
04/08/02
175
100
Totals per Removal Temp Wiring - Signals
Work Type: Signal Removal 300 06 0225 / 5340
N DESPLAINES ST AND W RANDOLPH ST
Work Type: Signals 300 06 0096 / 5258
1463 W CHICAGO AVE
Work Type: TSM Install
5.50
22,000
13,050
Locations .50
11/01/02
11/30/02
2,500 09/25/02
11/14/02
1,906
100
11/01/03
11/07/03
0 11/20/03
11/28/03
25,457
100
Intersections 161.0
Locations
814 06 0160 / 16373
150 N DESPLAINES ST
1.0
02/13/92
02/13/92
0 02/13/92
02/13/92
106,743
100
814 06 0185 / 16397
300 N DESPLAINES ST
1.0
03/04/92
03/04/92
0 03/04/92
03/04/92
106,743
100
814 06 0187 / 16399
453 N MILWAUKEE AVE
1.0
03/20/92
03/20/92
0 03/20/92
03/20/92
106,743
100
814 06 0270 / 16482
1000 N MILWAUKEE AVE
1.0
12/04/90
12/04/90
0 12/04/90
12/04/90
94,307
100
814 06 0053 / 16270
100 N MORGAN ST
1.0
08/02/96
08/02/96
0 08/02/96
08/02/96
123,933
100
814 06 0266 / 16478
1482 N OGDEN AVE
1.0
03/12/92
03/12/92
0 03/12/92
03/12/92
108,062
100
814 06 0264 / 16476
800 N ORLEANS ST
1.0
03/13/92
03/13/92
0 03/13/92
03/13/92
108,062
100
814 06 0052 / 16269
100 N SANGAMON ST
1.0
08/05/96
08/05/96
0 08/05/96
08/05/96
158,482
100
814 06 0083 / 16299
1327 W DIVISION ST
1.0
10/05/93
10/05/93
0 10/05/93
10/05/93
26,873
100
814 06 0326 / 16530
1600 W MADISON ST
1.0
01/01/96
01/01/96
0 01/01/96
04/10/97
100,000
100
210 06 0006 / 4281
1800 W MADISON ST
1.0
03/01/00
05/31/00
150,000 03/16/00
04/24/00
102,142
11.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
150,000
1,142,090
Locations
300 11 / 32191
ON N CALIFORNIA AVE FROM W MADISON ST TO W WALNUT ST
2.94
11/14/08
12/15/08
1,006 11/14/08
12/15/08
947
100
300 11 / 32191
ON S PAULINA ST FROM W MADISON ST TO W VAN BUREN ST
4.81
11/14/08
12/16/08
1,820 11/14/08
12/16/08
1,549
100
300 06 0108 / 5263
N WELLS ST AND W NORTH AVE
04/01/05
04/10/05
1,470
0
4,296
2,496
Totals per Traffic Equipment Painting
7.75
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 290
1/1/2008 AND 12/31/2008
Ward 27 Walter Burnett, Jr. CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Totals per Construction Phase
4,186,785
3,946,190
Totals for Ward 27
4,534,635
3,967,883
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 291
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,352
100
300 06 0308 / 5414
ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,566
100
300 06 0292 / 5399
9 N LARAMIE AVE
.0
02/18/05
300 06 0282 / 5390
2750 W ROOSEVELT RD
1.0
10/26/04
Totals per Design/Engineering
1.0
2,000 02/18/05 11/16/04
2,500 11/01/04 4,500
11/16/04
842
0
2,175
100
5,935
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 292
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 09 / 33094
ON N LEAMINGTON AVE FROM W KINZIE ST TO W OHIO ST
5.0
302 00 0092 / 5774
ON N PINE AVE FROM W LAKE ST TO W FERDINAND ST
3.0
300 05 0024 / 5139
ON W GLADYS AVE FROM S KARLOV AVE TO S KEELER AVE
1.50
04/04/05
300 11 / 32217
ON W MAYPOLE AVE FROM N KOSTNER AVE TO N KENTON AVE
12.0
08/01/07
300 06 0069 / 5233
400 N PINE AVE
2.0
04/20/02
302 00 0092 / 5774
5000-5099 W GLADYS AVE
7.0
302 00 0092 / 5774
3000-3099 W LEXINGTON ST
5.0
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 06 0122 / 5275
ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST
300 09 / 33068
ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD
Totals per 400 Watt Changeout Totals per Lighting/Electrical
2,000
10/23/01
0
0
618
100
08/10/05
329
100
08/16/07
5,000
100
420 04/17/02
04/17/02
406
100
0 12/17/01
12/17/01
1,421
100
1,029 09/28/01
09/28/01
1,029
100
0 02/01/02
02/06/02
11/18/05
1,050 07/15/05
08/10/07
5,000 08/16/07
04/20/02
10/23/01
35.50
9,499
8,803
Fixtures 6.0
08/01/04
08/15/04
2,500 06/10/04
06/10/04
1,506
100
4.50
06/09/08
06/13/08
1,800 06/09/08
06/13/08
1,449
100
10.50
4,300
2,955
1,958,443
2,145,237
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 293
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1077 / 7263
208 N HAMLIN BLVD
1.0
10/23/96
10/23/96
0 10/23/96
10/23/96
300
100
805 06 1169 / 7355
262 N KEELER AVE
1.0
05/31/95
05/31/95
0 05/31/95
05/31/95
300
100
805 06 0344 / 6530
548 N LARAMIE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
302 00 0092 / 5774
118 N PULASKI RD
5.0
0 07/19/01
12/13/01
1,178
100
300 06 0139 / 5289
259 N PULASKI RD
1,747.0
03/01/06
09/01/06
40,500 07/01/06
07/15/06
52,784
100
805 06 0925 / 7111
1000 S FRANCISCO AVE
1.0
11/15/96
11/15/96
0 11/15/96
11/15/96
300
100
805 06 1919 / 8105
1100 S MOZART ST
1.0
11/18/96
11/18/96
0 11/18/96
11/18/96
300
100
805 06 0685 / 6871
1100 S RICHMOND ST
1.0
11/18/96
11/18/96
0 11/18/96
11/18/96
300
100
805 06 0363 / 6549
210 S TROY ST
1.0
06/14/96
06/14/96
0 06/14/96
06/14/96
300
100
805 06 0974 / 7160
2620 W 15TH PL
1.0
07/06/95
07/06/95
0 07/06/95
07/06/95
300
100
805 06 0953 / 7139
2722 W 23RD ST
1.0
10/26/95
10/26/95
0 10/26/95
10/26/95
300
100
805 06 0785 / 6971
3540 W ADAMS ST
1.0
07/24/96
07/24/96
0 07/24/96
07/24/96
300
100
805 06 0716 / 6902
4818 W ERIE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1726 / 7912
4917 W FERDINAND ST
1.0
05/23/97
05/23/97
0 05/23/97
05/23/97
300
100
805 06 0898 / 7084
2800 W FILLMORE ST
1.0
11/18/96
11/18/96
0 11/18/96
11/18/96
300
100
805 06 0689 / 6875
2926 W FILLMORE ST
1.0
10/10/95
10/10/95
0 10/10/95
10/10/95
300
100
805 06 1214 / 7400
4903 W HUBBARD ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1336 / 7522
3526 W JACKSON BLVD
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 2005 / 8191
5323 W LAKE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1849 / 8035
4605 W MADISON ST
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 1834 / 8020
4202 W MAYPOLE AVE
1.0
06/21/95
06/21/95
0 06/21/95
06/21/95
300
100
805 06 1754 / 7940
4702 W OHIO ST
1.0
05/23/97
05/23/97
0 05/23/97
05/23/97
300
100
805 06 1755 / 7941
4716 W OHIO ST
1.0
05/23/97
05/23/97
0 05/23/97
05/23/97
300
100
302 00 0092 / 5774
5147 W WASHINGTON ST
1.0
0 12/10/01
12/10/01
236
100
805 06 0524 / 6710
4719 W WEST END AVE
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
805 06 0512 / 6698
4732 W WEST END AVE
1.0
08/14/95
08/14/95
0 08/14/95
08/14/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
259 N PULASKI RD
1,776.0
40,500
61,098
Lamps 2,592.0
06/01/07
12/31/07
76,308 06/08/07
07/11/07
76,308
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 294
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
Installations
118 N PULASKI RD
2,497.0
Work Type: Flood Light Install
Fixtures 05/18/01
06/11/02
45,466
100
300 06 0198 / 5323
OGDEN COURTS
8,375 05/30/01
05/31/01
4,887
100
300 06 0069 / 5233
ON W 24TH ST FROM S ROCKWELL ST TO S CALIFORNIA AVE
1.25
469 06/24/02
06/24/02
469
100
300 06 0167 / 5306
W JACKSON BLVD AND S FRANCISCO AVE
1.50
0 12/08/99
12/08/99
527
100
300 06 0167 / 5306
W MONROE ST AND S CENTRAL PARK AVE
6.0
0 03/24/99
03/24/99
1,429
100
300 06 0071 / 5234
100 N CENTRAL PARK AVE
0 02/01/99
01/12/01
427,832
100
300 06 0167 / 5306
119 S CENTRAL PARK AVE
1.0
0 12/08/99
12/08/99
351
100
302 00 0092 / 5774
2424 W 18TH ST
1.0
0 10/15/01
10/15/01
404
100
02/01/99
300 06 0292 / 5399
01/31/01
10.75
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
05/19/01
0 06/08/02
8,844
435,898
Installations
9 N LARAMIE AVE
Work Type: Lighting Imprvmnts
1.0
07/17/06
12/31/06
5,497 07/26/06
12/31/06
5,924
25
Projects
300 06 0201 / 5325
190 N CENTRAL PARK DR
1.0
06/01/01
12/01/01
90,216 06/14/01
06/29/01
84,143
100
300 06 0201 / 5325
200 N PULASKI RD
1.0
10/01/01
12/31/01
100,820 10/04/01
11/28/01
108,257
100
300 06 0118 / 5272
5200 W LAKE ST
1.0
10/30/00
06/29/01
31,888 04/12/01
05/31/01
22,855
100
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting 300 09 / 33068
ON W ADAMS ST FROM S FRANCISCO AVE TO S SACRAMENTO BLVD
Work Type: Residential Regrouping 300 06 0270 / 5378
259 N PULASKI RD
3.0
222,924
215,255
Fixtures 4.50
07/28/08
08/08/08
03/01/08
12/01/08
9,000 07/28/08
08/08/08
5,153
100
0
0
Lamps .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 295
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33094
ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST
1.0
300 05 0028 / 5143
ON N PINE AVE FROM W LAKE ST TO W RACE AVE
1.0
09/15/05
11/18/05
300 07 0002 / 5425
ON S FRANCISCO AVE FROM W WILCOX ST TO W VAN BUREN ST
1.0
04/18/06
11/18/06
300 09 / 33094
ON W ADAMS ST FROM S CICERO AVE TO S LARAMIE AVE
4.0
260,000
300 11 / 32217
ON W ADAMS ST FROM S HOMAN AVE TO S CENTRAL PARK BLVD
2.0
300 11 / 32217
ON W ADAMS ST FROM S KENTON AVE TO S CICERO AVE
2.0
300 07 0029 / 5452
ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE
1.0
07/12/06
09/27/06
65,000 07/20/06
300 07 0028 / 5451
ON W MONROE ST FROM S CICERO AVE TO S LAVERGNE AVE
2.0
04/01/07
06/01/07
300 06 0308 / 5414
ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE
1.0
04/24/06
06/16/06
300 06 0308 / 5414
ON W WILCOX ST FROM S PULASKI RD TO S KEELER AVE
2.0
09/01/06
11/22/06
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
65,000
17.0
0
0
60,000 08/18/05
10/14/05
44,514
100
80,000 09/01/06
10/27/06
51,733
100
0
0
140,000
0
0
140,000
0
0
09/27/06
59,636
100
100,000 10/05/06
11/17/06
80,345
100
91,485 04/19/06
06/19/06
63,076
100
165,823 08/04/06
10/24/06
117,933
100
1,167,308
417,236
Blocks
300 06 0235 / 5349
ON N LATROBE AVE FROM W OHIO ST TO W CHICAGO AVE
2.0
06/21/03
08/21/03
165,298 07/07/03
10/06/03
158,431
100
300 06 0267 / 5375
ON W MONROE ST FROM S LAVERGNE AVE TO S LARAMIE AVE
2.0
10/01/04
12/01/04
194,928 10/12/04
12/03/04
142,679
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
4.0
360,226
301,110
Locations
302 00 0092 / 5774
2101 S FAIRFIELD AVE
1.0
0 06/14/01
06/14/01
378
100
302 00 0092 / 5774
3000 W HARRISON ST
1.0
0 05/16/01
05/16/01
378
100
302 00 0092 / 5774
3020 W HARRISON ST
1.0
0 05/16/01
05/16/01
378
100
302 00 0092 / 5774
3030 W HARRISON ST
1.0
0 05/16/01
05/16/01
378
100
302 00 0092 / 5774
3040 W HARRISON ST
1.0
0 05/16/01
05/16/01
378
100
5.0
0
Totals per Short Arm Installs - Residntl
1,890
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 296
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 11 / 32191
ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST
5.60
11/14/08
12/16/08
1,400 11/14/08
12/16/08
1,120
100
300 04 0216 / 5114
ON S PULASKI RD FROM W JACKSON BLVD TO W MADISON ST
22.0
05/01/06
11/01/06
4,687 05/17/06
06/22/06
4,687
100
300 06 0108 / 5263
ON S SACRAMENTO AVE FROM W POLK ST TO W FLOURNOY ST
6.0
08/10/04
08/11/04
1,500 07/23/04
07/28/04
1,476
100
300 11 / 32191
ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST
22.80
11/14/08
12/16/08
5,700 11/14/08
12/16/08
4,560
100
300 09 / 33068
ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD
5.76
06/02/08
06/20/08
1,728 06/02/08
06/26/08
1,210
100
300 09 / 33068
15.25
10/07/08
10/22/08
4,575 10/07/08
10/22/08
3,203
100
300 09 / 33068
ON W CONGRESS PKWY FROM S FRANCISCO AVE TO S MAPLEWOOD AVE ON W HARRISON ST FROM S MAPLEWOOD AVE TO S SACRAMENTO BLVD
16.80
08/13/08
09/09/08
5,040 08/13/08
09/09/08
3,528
100
300 11 / 32191
ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE
9.36
11/14/08
12/15/08
2,340 11/14/08
12/15/08
1,872
100
300 11 / 32191
ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE
10.08
11/14/08
12/16/08
2,520 11/14/08
12/16/08
2,016
100
Totals per Strt Light Pole Painting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
259 N PULASKI RD
113.65
29,490
23,671
Lamps 3,175.0
03/01/04
12/01/04
16,510 10/05/06
10/13/06
34,576
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 297
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2549 / 8735
401 N CENTRAL AVE
16.0
09/11/91
09/11/91
0 09/11/91
09/11/91
12,000
100
805 06 2457 / 8643
340 N CENTRAL PARK AVE
10.0
09/18/95
09/18/95
0 09/18/95
09/18/95
7,500
100
302 00 0070 / 5758
400 N CICERO AVE
0 02/01/97
02/07/97
4,554
100
805 06 2697 / 8883
334 N KEDZIE AVE
18.0
10/07/94
10/07/94
0 10/07/94
10/07/94
13,500
100
805 06 2930 / 9116
395 N LARAMIE AVE
14.0
08/16/91
08/16/91
0 08/16/91
08/16/91
10,500
100
805 06 2929 / 9115
395 N LAVERGNE AVE
14.0
03/04/94
03/04/94
0 03/04/94
03/04/94
10,500
100
805 06 2766 / 8952
398 N LOCKWOOD AVE
14.0
04/29/94
04/29/94
0 04/29/94
04/29/94
10,500
100
805 06 2767 / 8953
399 N LONG AVE
16.0
06/25/93
06/25/93
0 06/25/93
06/25/93
12,000
100
805 06 2547 / 8733
401 N PINE AVE
14.0
04/27/95
04/27/95
0 04/27/95
04/27/95
10,500
100
300 06 0217 / 5337
118 N PULASKI RD
143.0
05/12/04
05/14/04
8,038 01/16/04
01/21/04
11,740
100
805 06 2781 / 8967
343 N ST LOUIS AVE
6.0
12/23/94
12/23/94
0 12/23/94
12/23/94
4,500
100
805 06 2168 / 8354
1001 S CALIFORNIA AVE
14.0
12/31/95
12/31/95
0 12/31/95
12/31/95
10,500
100
805 06 2786 / 8972
1901 S CALIFORNIA AVE
6.0
05/20/94
05/20/94
0 05/20/94
05/20/94
4,500
100
805 06 2940 / 9126
1005 S FAIRFIELD AVE
8.0
03/14/94
03/14/94
0 03/14/94
03/14/94
6,000
100
805 06 2780 / 8966
1001 S FRANCISCO AVE
14.0
06/07/94
06/07/94
0 06/07/94
06/07/94
10,500
100
805 06 2800 / 8986
1000 S SACRAMENTO BLVD
8.0
04/07/94
04/07/94
0 04/07/94
04/07/94
6,000
100
805 06 2779 / 8965
1001 S WASHTENAW AVE
10.0
04/26/94
04/26/94
0 04/26/94
04/26/94
7,500
100
805 06 2360 / 8546
2401 W 15TH ST
56.0
04/02/96
04/02/96
0 04/02/96
04/02/96
42,000
100
805 06 2494 / 8680
2405 W 16TH ST
21.0
09/14/95
09/14/95
0 09/14/95
09/14/95
15,750
100
805 06 2495 / 8681
2405 W 16TH ST
20.0
09/14/95
09/14/95
0 09/14/95
09/14/95
15,000
100
805 06 2203 / 8389
2400 W 18TH ST
24.0
08/16/92
08/16/92
0 08/16/92
08/16/92
18,000
100
302 00 0072 / 5760
2500 W 21ST ST
1.0
0 10/21/99
01/05/00
35,750
100
805 06 2762 / 8948
4599 W ADAMS ST
4.0
05/01/94
05/01/94
0 05/01/94
05/01/94
3,000
100
805 06 2932 / 9118
2505 W ARTHINGTON ST
8.0
02/01/94
02/01/94
0 02/01/94
02/01/94
6,000
100
805 06 2306 / 8492
4599 W CHICAGO AVE
38.0
08/13/96
08/13/96
0 08/13/96
08/13/96
28,500
100
805 06 2764 / 8950
4605 W FULTON ST
4.0
05/24/94
05/24/94
0 05/24/94
05/24/94
3,000
100
805 06 2574 / 8760
4601 W LAKE ST
8.0
03/27/95
03/27/95
0 03/27/95
03/27/95
6,000
100
805 06 2392 / 8578
4600 W MADISON ST
5.0
12/31/95
12/31/95
0 12/31/95
12/31/95
3,750
100
805 06 2763 / 8949
4601 W MAYPOLE AVE
8.0
05/20/94
05/20/94
0 05/20/94
05/20/94
6,000
100
805 06 2733 / 8919
4597 W MONROE ST
4.0
07/06/94
07/06/94
0 07/06/94
07/06/94
3,000
100
302 00 0072 / 5760
4650 W MONROE ST
1.0
0 04/26/00
05/15/00
25,851
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 298
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2509 / 8695
2440 W OGDEN AVE
8.0
07/07/95
07/07/95
0 07/07/95
07/07/95
6,000
100
805 06 2512 / 8698
2440 W OGDEN AVE
8.0
06/16/95
06/16/95
0 06/16/95
06/16/95
6,000
100
805 06 2507 / 8693
2457 W OGDEN AVE
9.0
06/29/95
06/29/95
0 06/29/95
06/29/95
6,750
100
805 06 2526 / 8712
2457 W OGDEN AVE
3.0
06/21/95
06/21/95
0 06/21/95
06/21/95
2,250
100
805 06 2550 / 8736
2457 W OGDEN AVE
10.0
06/22/95
06/22/95
0 06/22/95
06/22/95
7,500
100
805 06 2594 / 8780
2457 W OGDEN AVE
15.0
06/16/95
06/16/95
0 06/16/95
06/16/95
11,250
100
805 06 2580 / 8766
2460 W OGDEN AVE
3.0
06/29/95
06/29/95
0 06/29/95
06/29/95
2,250
100
805 06 2510 / 8696
2500 W OGDEN AVE
16.0
07/07/95
07/07/95
0 07/07/95
07/07/95
12,000
100
805 06 2513 / 8699
2500 W OGDEN AVE
21.0
06/16/95
06/16/95
0 06/16/95
06/16/95
15,750
100
805 06 2508 / 8694
2520 W OGDEN AVE
8.0
06/29/95
06/29/95
0 06/29/95
06/29/95
6,000
100
805 06 2511 / 8697
2520 W OGDEN AVE
12.0
07/07/95
07/07/95
0 07/07/95
07/07/95
9,000
100
805 06 2572 / 8758
2520 W OGDEN AVE
8.0
07/06/95
07/06/95
0 07/06/95
07/06/95
6,000
100
805 06 2228 / 8414
2519 W ROOSEVELT RD
14.0
10/29/96
10/29/96
0 10/29/96
10/29/96
10,500
100
805 06 2253 / 8439
2519 W ROOSEVELT RD
37.0
10/29/96
10/29/96
0 10/29/96
10/29/96
27,750
100
805 06 2705 / 8891
2505 W TAYLOR ST
14.0
07/27/94
07/27/94
0 07/27/94
07/27/94
10,500
100
805 06 2916 / 9102
4605 W WASHINGTON BLVD
8.0
03/21/94
03/21/94
0 03/21/94
03/21/94
6,000
100
Totals per Underpass Lighting
721.0
8,038
509,895
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 299
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N HOMAN AVE AND W FRANKLIN BLVD
.50
0 05/02/02
05/02/02
4,270
100
210 06 0130 / 4389
N KEELER AVE AND W WASHINGTON ST
1.0
0 03/26/02
03/26/02
5,651
100
210 06 0219 / 4459
S WESTERN AVE AND W 16TH ST
.50
03/10/05
03/11/05
5,282 04/28/05
04/28/05
4,004
100
210 06 0219 / 4459
S WESTERN AVE AND W ROOSEVELT RD
.50
03/14/05
03/15/05
5,282 03/28/05
03/28/05
4,783
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 300 03 0028 / 4899
N CICERO AVE AND W MADISON ST
Work Type: Removal Temp Wiring - Signals
2.50
10,563
18,707
96,500 04/07/05
29,678
40
Locations 1.0
03/01/05
08/15/05
Crossings
300 06 0197 / 5322
N LONG AVE AND W WASHINGTON BLVD
2.0
8,000 10/04/01
10/10/01
9,370
100
300 06 0197 / 5322
S SACRAMENTO AVE AND W ARTHINGTON ST
2.0
8,000 07/17/01
07/27/01
10,535
100
300 06 0197 / 5322
S SACRAMENTO AVE AND W FIFTH AVE
.50
2,000 07/18/01
07/19/01
1,948
100
300 06 0197 / 5322
W CERMAK RD AND S WASHTENAW AVE
1.0
4,000 06/25/01
07/11/01
2,097
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
118 N PULASKI RD
Work Type: TSM Install
5.50
22,000
23,950
Intersections 71.0
11/01/03
11/07/03
0 11/11/03
11/17/03
11,227
100
Locations
814 06 0245 / 16457
100 N CICERO AVE
1.0
02/06/92
02/06/92
0 02/06/92
02/06/92
40,173
100
814 06 0247 / 16459
199 N CICERO AVE
1.0
01/01/92
01/01/92
0 01/01/92
01/01/92
40,173
100
814 06 0116 / 16331
500 N CICERO AVE
1.0
07/02/92
07/02/92
0 07/02/92
07/02/92
103,965
100
814 06 0231 / 16443
600 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
92,500
100
814 06 0220 / 16432
1 S CICERO AVE
1.0
02/13/92
02/13/92
0 02/13/92
02/13/92
40,173
100
814 06 0223 / 16435
300 S CICERO AVE
1.0
02/13/92
02/13/92
0 02/13/92
02/13/92
40,173
100
814 06 0391 / 16579
4000 W JACKSON BLVD
1.0
02/06/96
02/06/96
0 02/06/96
02/06/96
152,719
100
Totals per TSM Install Totals per Traffic
7.0
0
509,876
144,150
599,688
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 300
1/1/2008 AND 12/31/2008
Ward 28 Ed H. Smith CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 11 / 32191
ON S CALIFORNIA AVE FROM W MADISON ST TO W ARTHINGTON ST
300 11 / 32191
ON S SACRAMENTO BLVD FROM W MADISON ST TO W ARTHINGTON ST
3.36
11/14/08
12/16/08
300 09 / 33068
ON W ADAMS ST FROM S ROCKWELL ST TO S SACRAMENTO BLVD
1.92
06/02/08
06/20/08
534 04/01/08
300 07 0024 / 5447
ON W FIFTH AVE FROM S ALBANY AVE TO S KEDZIE AVE
16.0
04/18/06
11/18/06
300 11 / 32191
ON W JACKSON BLVD FROM S SACRAMENTO BLVD TO S WESTERN AVE
3.84
11/14/08
12/15/08
300 11 / 32191
ON W VAN BUREN ST FROM S SACRAMENTO BLVD TO S WESTERN AVE
1.68
11/14/08
12/16/08
13.68
40.48
1,149 11/14/08
12/16/08
4,899
1,082
0
12/01/08
0
100
6,500 07/15/06
07/24/06
3,392
100
1,416 11/14/08
12/15/08
1,236
100
588 11/14/08
12/16/08
541
100
15,087
6,251
Totals per Construction Phase
2,102,593
2,744,926
Totals for Ward 28
2,107,093
2,750,860
Totals per Traffic Equipment Painting
100
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 301
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32275
ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
.0
03/01/07
10/31/07
2,216
100
300 06 / 32277
ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE
.0
04/01/08
08/30/08
0
0
0
300 06 / 32277
ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE
.0
04/01/08
08/30/08
0
0
0
300 06 0308 / 5414
ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,352
100
300 06 0308 / 5414
ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
334
100
210 06 / 32040
N AUSTIN BLVD AND W LAKE ST
.0
11/01/06
12/31/07
5,000 10/03/06
10/20/06
3,505
100
210 06 0243 / 4480
W HARRISON ST AND S LARAMIE AVE
.0
12/26/06
01/26/07
250 12/26/06
01/26/07
638
100
281 00 / 33662
1200-1600 N MASON AVE
.0
10/05/07
11/20/07
0
0
0
9,150
8,044
Totals per Design/Engineering
.0
3,900 01/24/07
02/21/07
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 302
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 03 0029 / 4900
ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST
300 03 0029 / 4900
ON N MASON AVE FROM W FULLERTON AVE TO W ALTGELD ST
300 06 0122 / 5275
Fixtures 5.0
04/26/04
05/02/04
2,013 05/01/04
05/01/04
917
100
10.0
04/26/04
05/02/04
4,025 05/01/04
05/01/04
1,833
100
ON N MASON AVE FROM W THOMAS ST TO W DIVISION ST
5.0
07/17/03
07/18/03
2,075 06/17/03
06/17/03
1,823
100
300 07 0029 / 5452
ON N MASON AVE FROM W WEST END AVE TO W CORCORAN PL
8.0
04/18/06
11/18/06
3,200
302 00 0092 / 5774
ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST
4.0
0 07/10/01
07/11/01
302 00 0092 / 5774
ON N MASSASOIT AVE FROM W IOWA ST TO W AUGUSTA BLVD
4.0
0 07/10/01
302 00 0092 / 5774
ON N MENARD AVE FROM W CHICAGO AVE TO W IOWA ST
5.0
0 07/16/01
302 00 0092 / 5774
ON N MENARD AVE FROM W IOWA ST TO W AUGUSTA BLVD
5.0
300 06 0069 / 5233
ON N MENARD AVE FROM W MADISON ST TO W WASHINGTON BLVD
5.0
300 06 0069 / 5233
ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
5.0
05/13/02
300 03 0029 / 4900
ON N MENARD AVE FROM W NORTH AVE TO W WABANSIA AVE
10.0
04/26/04
302 00 0092 / 5774
ON N MENARD AVE FROM W WASHINGTON BLVD TO W WEST END AVE
6.0
300 03 0029 / 4900
ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST
9.0
302 00 0092 / 5774
ON N PARKSIDE AVE FROM W AUGUSTA BLVD TO W THOMAS ST
302 00 0092 / 5774
0
0
824
100
07/11/01
824
100
07/18/01
1,030
100
0 07/16/01
07/18/01
1,030
100
0 05/08/02
05/08/02
1,875
100
05/13/02
1,050 05/10/02
05/10/02
1,015
100
05/02/04
4,025 05/01/04
05/01/04
1,834
100
0 12/17/01
12/17/01
1,218
100
3,775 05/25/04
05/25/04
1,824
100
3.0
0 07/10/01
07/11/01
618
100
ON N PARKSIDE AVE FROM W CHICAGO AVE TO W IOWA ST
4.0
0 07/10/01
07/11/01
824
100
302 00 0092 / 5774
ON N PARKSIDE AVE FROM W IOWA ST TO W AUGUSTA BLVD
4.0
0 07/10/01
07/11/01
824
100
300 07 0029 / 5452
ON N WALLER AVE FROM W AUGUSTA BLVD TO W DIVISION ST
9.0
302 00 0092 / 5774
ON N WALLER AVE FROM W CHICAGO AVE TO W IOWA ST
4.0
0 07/10/01
302 00 0092 / 5774
ON N WALLER AVE FROM W IOWA ST TO W AUGUSTA BLVD
5.0
302 00 0092 / 5774
ON N WALLER AVE FROM W MADISON ST TO W WASHINGTON BLVD
5.0
302 00 0092 / 5774
ON S MAYFIELD AVE FROM W FILLMORE ST TO W ROOSEVELT RD
302 00 0092 / 5774
06/01/04
04/18/06
06/02/04
11/18/06
3,800
0
0
07/11/01
824
100
0 07/10/01
07/11/01
1,030
100
0 12/12/01
12/12/01
1,029
100
5.0
0 12/18/01
12/18/01
1,029
100
ON W CONGRESS PKWY FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
0 07/21/01
07/25/01
4,116
100
302 00 0092 / 5774
ON W GLADYS AVE FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
0 07/21/01
07/25/01
4,116
100
300 06 0069 / 5233
ON W HURON ST FROM N CENTRAL AVE TO N MENARD AVE
8.0
07/06/02
07/06/02
1,680 07/03/02
07/03/02
1,624
100
300 07 0029 / 5452
ON W IOWA ST FROM N MENARD AVE TO N AUSTIN BLVD
8.0
04/18/06
11/18/06
3,200
302 00 0092 / 5774
ON W JACKSON BLVD FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
0 07/24/01
302 00 0092 / 5774
ON W MONROE ST FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
302 00 0092 / 5774
ON W QUINCY ST FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
300 07 0029 / 5452
ON W RICE ST FROM N MAYFIELD AVE TO N AUSTIN BLVD
300 07 0029 / 5452 302 00 0092 / 5774
0
0
07/24/01
7,086
100
0 07/21/01
07/25/01
4,116
100
0 07/21/01
07/25/01
4,116
100
01/05/07
0
100
5.0
04/18/06
11/18/06
2,200 01/05/07
ON W SUPERIOR ST FROM N MENARD AVE TO N AUSTIN BLVD
10.0
04/18/06
11/18/06
4,000
ON W VAN BUREN ST FROM S LARAMIE AVE TO S CENTRAL AVE
20.0
0 07/21/01
07/25/01
0
0
4,116
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 303
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 03 0029 / 4900
1100 N MAYFIELD AVE
6.0
06/01/04
06/02/04
2,450 05/25/04
05/25/04
1,422
100
302 00 0092 / 5774
1400 N MAYFIELD AVE
4.0
07/06/02
07/06/02
840 07/06/02
07/06/02
812
100
300 06 0069 / 5233
1700 N MAYFIELD AVE
5.0
04/28/03
04/28/03
1,875 05/01/03
05/01/03
987
100
210 06 0022 / 4297
2100-2199 N MEADE AVE
6.0
0 02/22/02
02/22/02
2,250
100
300 06 0069 / 5233
2100-2199 N MEADE AVE
6.0
2,250 02/22/02
02/22/02
2,250
100
302 00 0092 / 5774
600 N WALLER AVE
8.0
1,680 12/14/02
12/14/02
1,624
100
302 00 0092 / 5774
5000-5099 W CONGRESS PKWY
7.0
0 07/21/01
07/25/01
1,441
100
302 00 0092 / 5774
5900-5999 W ERIE ST
6.0
0 07/16/01
07/18/01
1,236
100
302 00 0092 / 5774
5510 W GLADYS AVE
5.0
1,015 01/30/02
01/30/02
1,050
100
302 00 0092 / 5774
5900 W HURON ST
6.0
0 07/16/01
07/18/01
1,236
100
302 00 0092 / 5774
5600-5699 W IOWA ST
3.0
0 07/10/01
07/11/01
618
100
302 00 0092 / 5774
5700-5799 W IOWA ST
2.0
0 07/10/01
07/11/01
412
100
302 00 0092 / 5774
5200-5299 W LEXINGTON ST
6.0
0 07/18/01
07/18/01
2,126
100
302 00 0092 / 5774
5900-5999 W OHIO ST
6.0
0 07/16/01
07/18/01
1,236
100
302 00 0092 / 5774
5000-5099 W VAN BUREN ST
7.0
0 12/17/01
12/17/01
1,421
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 07 0029 / 5452
ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD
Totals per Lighting/Electrical
12/14/02
02/02/02
12/14/02
02/02/02
354.0
45,153
71,636
Fixtures 35.0
10/23/06
01/04/07
14,000 10/23/06 3,663,768
01/04/07
0 2,074,586
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 304
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0725 / 6911
1642 N AUSTIN AVE
1.0
04/30/96
04/30/96
0 04/30/96
04/30/96
300
100
805 06 0741 / 6927
1718 N AUSTIN AVE
1.0
04/22/96
04/22/96
0 04/22/96
04/22/96
300
100
805 06 1749 / 7935
1719 N AUSTIN AVE
1.0
05/22/97
05/22/97
0 05/22/97
05/22/97
300
100
805 06 0835 / 7021
1738 N AUSTIN AVE
1.0
06/13/96
06/13/96
0 06/13/96
06/13/96
300
100
805 06 1827 / 8013
1016 N MASSASOIT AVE
1.0
06/16/96
06/16/96
0 06/16/96
06/16/96
300
100
805 06 1838 / 8024
1720 N MC VICKER AVE
1.0
01/30/97
01/30/97
0 01/30/97
01/30/97
300
100
805 06 1840 / 8026
1756 N MC VICKER AVE
1.0
04/30/96
04/30/96
0 04/30/96
04/30/96
300
100
805 06 1816 / 8002
1632 N MEADE AVE
1.0
04/30/96
04/30/96
0 04/30/96
04/30/96
300
100
805 06 1819 / 8005
1638 N MELVINA AVE
1.0
06/13/96
06/13/96
0 06/13/96
06/13/96
300
100
805 06 1821 / 8007
1716 N MELVINA AVE
1.0
01/31/97
01/31/97
0 01/31/97
01/31/97
300
100
805 06 1666 / 7852
2100 N MERRIMAC AVE
1.0
07/09/97
07/09/97
0 07/09/97
07/09/97
300
100
805 06 1948 / 8134
1615 N MOBILE AVE
1.0
05/01/96
05/01/96
0 05/01/96
05/01/96
300
100
805 06 1950 / 8136
2351 N MOBILE AVE
1.0
03/20/97
03/20/97
0 03/20/97
03/20/97
300
100
805 06 1878 / 8064
1838 N MULLIGAN AVE
1.0
01/31/97
01/31/97
0 01/31/97
01/31/97
300
100
805 06 1899 / 8085
1823 N NARRAGANSETT AVE
1.0
01/30/97
01/30/97
0 01/30/97
01/30/97
300
100
805 06 0403 / 6589
1538 N WALLER AVE
1.0
08/22/96
08/22/96
0 08/22/96
08/22/96
300
100
302 00 0092 / 5774
1021 S AUSTIN AVE
1.0
0 05/21/01
05/21/01
236
100
302 00 0092 / 5774
1041 S AUSTIN AVE
1.0
0 05/21/01
05/21/01
236
100
805 06 1974 / 8160
1041 S MONITOR AVE
1.0
10/10/96
10/10/96
0 10/10/96
10/10/96
300
100
805 06 1847 / 8033
5958 W CORTLAND ST
1.0
08/28/96
08/28/96
0 08/28/96
08/28/96
300
100
805 06 1114 / 7300
6301 W FULLERTON AVE
1.0
02/15/95
02/15/95
0 02/15/95
02/15/95
300
100
805 06 1122 / 7308
5959 W GRAND AVE
1.0
06/13/95
06/13/95
0 06/13/95
06/13/95
300
100
805 06 2006 / 8192
5944 W LAKE ST
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
300 06 0139 / 5289
5937 W MADISON ST
1,133.0
03/01/06
09/01/06
27,852 05/12/06
06/07/06
34,232
100
302 00 0092 / 5774
5937 W MADISON ST
24.0
0 03/15/01
09/24/01
5,656
100
805 06 1841 / 8027
5920 W MIDWAY PARK
1.0
11/15/95
11/15/95
0 11/15/95
11/15/95
300
100
805 06 0589 / 6775
5960 W NORTH AVE
1.0
05/15/96
05/15/96
0 05/15/96
05/15/96
300
100
805 06 2092 / 8278
6046 W NORTH AVE
1.0
10/11/96
10/11/96
0 10/11/96
10/11/96
300
100
805 06 0591 / 6777
6150 W NORTH AVE
1.0
10/02/96
10/02/96
0 10/02/96
10/02/96
300
100
805 06 0430 / 6616
5941 W WALTON ST
1.0
03/23/95
03/23/95
0 03/23/95
03/23/95
300
100
Totals per Alley Lighting/Lamps
1,185.0
27,852
48,160
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 305
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
5937 W MADISON ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5937 W MADISON ST
Work Type: Flood Light Install 300 06 0071 / 5234
500 S CENTRAL AVE
300 06 0167 / 5306
5900-6000 W ADAMS ST
300 06 0071 / 5234
6100 W FULLERTON AVE
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting 300 07 0029 / 5452
ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD
Work Type: Residential Regrouping 300 06 0270 / 5378
5253 W MADISON ST
Lamps 1,347.0
06/01/07
12/31/07
39,655 06/05/07
07/10/07
39,655
100
0 06/16/02
06/19/02
22,797
100
0 09/27/00
10/06/00
9,450
100
0 08/31/99
08/31/99
1,128
100
0
485
100
0
11,063
Installations 1,252.0
Fixtures 01/01/00
12/30/00
7.0 12/01/00
12/30/00
7.0
Fixtures 30.0
10/23/06
01/04/07
03/01/08
12/01/08
40,500 10/23/06
01/04/07
0
100
0
0
Lamps .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 306
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks 10/16/07
300 11 / 32218
ON N MASON AVE FROM W NORTH AVE TO W CORTLAND ST
3.0
300 09 / 33095
meade ele. Note Last Updated on 05-FEB-08 ON N MASSASOIT AVE FROM W CHICAGO AVE TO W IOWA ST
1.0
300 09 / 33095
ON N MASSASOIT AVE FROM W DIVISION ST TO W HIRSCH ST
2.0
130,000
300 09 / 33095
ON N MAYFIELD AVE FROM W NORTH AVE TO W CORTLAND ST
3.0
162,500
0
0
300 06 / 32275
ON N MELVINA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
2.0
04/01/07
12/31/07
168,100 03/15/07
95,935
100
300 11 / 32218
ON N MENARD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
2.0
10/19/07
12/31/07
120,000
0
0
300 11 / 32218
meade ele. Note Last Updated on 05-FEB-08 ON N MONITOR AVE FROM W AUGUSTA BLVD TO W DIVISION ST
2.0
10/24/07
12/31/07
140,000
0
0
300 07 0029 / 5452
meade ele. Note Last Updated on 05-FEB-08 ON N MOODY AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
2.0
07/05/06
08/31/06
150,000 10/16/06
300 09 / 33095
ON N PARKSIDE AVE FROM W CHICAGO AVE TO W DIVISION ST
4.0
300 11 / 32218
ON N WALLER AVE FROM W DIVISION ST TO W HIRSCH ST
2.0
300 11 / 32218
meade ele. Note Last Updated on 05-FEB-08 ON W CONGRESS PKWY FROM S LAVERGNE AVE TO S LARAMIE AVE
2.0
300 11 / 32218
meade ele. Note Last Updated on 05-FEB-08 ON W CORTLAND ST FROM N MONITOR AVE TO N AUSTIN AVE
2.0
11/07/07
01/18/08
300 06 0298 / 5405
meade ele. Note Last Updated on 05-FEB-08 ON W ERIE ST FROM N AUSTIN BLVD TO N MENARD AVE
2.0
06/01/05
06/15/05
0 05/17/05
300 07 0029 / 5452
ON W GLADYS AVE FROM S LAVERGNE AVE TO S LEAMINGTON AVE
1.0
07/12/06
09/27/06
65,000 07/20/06
300 07 0029 / 5452
ON W HURON ST FROM N MENARD AVE TO N AUSTIN BLVD
2.0
07/26/06
09/29/06
170,000 11/01/06
300 11 / 32218
ON W HURON ST FROM N MENARD AVE TO N WALLER AVE
1.0
11/12/07
01/25/08
300 06 / 32277
meade ele. Note Last Updated on 05-FEB-08 ON W IOWA ST FROM N AUSTIN BLVD TO N MENARD AVE
.0
05/04/08
12/31/08
300 05 0029 / 5144
ON W MONROE ST FROM S LOCKWOOD AVE TO S LOTUS AVE
2.0
04/04/05
11/18/05
300 11 / 32218
ON W MONROE ST FROM S LOTUS AVE TO S CENTRAL AVE
1.0
11/14/07
01/25/08
60,000
300 05 0029 / 5144
meade ele. Note Last Updated on 05-FEB-08 ON W QUINCY ST FROM S LARAMIE AVE TO S LOCKWOOD AVE
1.0
04/04/05
11/18/05
85,000 07/20/05
300 06 / 32277
ON W RICE ST FROM N AUSTIN BLVD TO N MENARD AVE
.0
05/04/08
12/31/08
0
300 11 / 32218
ON W SUPERIOR ST FROM N WALLER AVE TO N AUSTIN BLVD
3.0
11/16/07
01/31/08
190,000
300 06 0308 / 5414
meade ele. Note Last Updated on 05-FEB-08 ON W VAN BUREN ST FROM S LAVERGNE AVE TO S LARAMIE AVE
1.0
04/24/06
06/16/06
12/31/07
170,000 65,000 04/01/08
10/26/07
12/31/07
12/01/08
06/14/07
05/04/07
0
0
0
0
0
0
99,422
100
260,000
0
0
130,000
0
0
170,000
0
0
65,000
0
0
06/16/05
161,857
100
09/27/06
59,636
100
05/07/07
111,705
100
0
0
40,000 0 170,000 07/22/05
91,485 04/19/06
09/16/05
09/16/05
06/19/06
0
0
115,797
100
0
0
49,882
100
0
0
0
0
63,076
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 307
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 06 0308 / 5414
ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE
.26
03/16/06
12/31/06
18,588 06/07/06
08/01/06
11,291
100
300 07 0030 / 5453
ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE
1.0
06/12/06
08/18/06
75,000 06/07/06
08/15/06
51,456
100
281 00 / 33662
Project has been completed Note Last Updated on 25-AUG-06 1200-1600 N MASON AVE
4.0
12/07/07
03/19/08
0 12/07/07
03/21/08
218,545
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
46.26
2,695,673
1,038,601
Blocks
300 03 0029 / 4900
ON W OHIO ST FROM N AUSTIN BLVD TO N WALLER AVE
3.0
07/15/04
10/01/04
240,000 08/12/04
10/13/04
140,190
100
300 06 0267 / 5375
ON W QUINCY ST FROM S LOCKWOOD AVE TO S CENTRAL AVE
2.0
09/01/04
11/01/04
202,151 09/01/04
10/12/04
137,577
100
300 06 0122 / 5275
ON W RACE AVE FROM N MAYFIELD AVE TO N AUSTIN AVE
1.0
07/15/03
09/15/03
110,000 06/07/03
09/15/03
110,000
100
300 06 0235 / 5349
ON W RACE AVE FROM N WALLER AVE TO N AUSTIN AVE
3.0
07/15/03
10/01/03
155,000 06/07/03
09/15/03
126,300
100
Totals per Residntl Strt Lighting/Lamps
9.0
707,151
514,067
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 308
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
10 N MASON AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
44 N MASON AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
20 N MAYFIELD AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
44 N MAYFIELD AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
1300 N PARKSIDE AVE
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1314 N PARKSIDE AVE
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1324 N PARKSIDE AVE
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1338 N PARKSIDE AVE
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1352 N PARKSIDE AVE
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1007 S AUSTIN AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
1021 S AUSTIN AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
1041 S AUSTIN AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
140 S MASON AVE
1.0
0 01/18/01
01/18/01
378
100
302 00 0092 / 5774
1000 S MASON AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
930 S MENARD AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
1000 S MENARD AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
1030 S MENARD AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
1050 S MENARD AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
1036 S MONITOR AVE
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
1049 S MONITOR AVE
1.0
0 01/17/01
01/17/01
378
100
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting 300 04 0216 / 5114
ON N AUSTIN AVE FROM W NORTH AVE TO W CORTLAND ST
300 04 0216 / 5114 300 07 0029 / 5452
ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY AVE ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD
302 00 0077 / 5765
5626 W LAKE ST
Totals per Strt Light Pole Painting
20.0
0
7,560
Locations 22.0
05/01/06
11/01/06
4,758 05/17/06
06/12/06
4,758
100
15.50
05/01/06
11/01/06
3,353 05/17/06
11/01/06
3,353
100
65.0
10/23/06
01/04/07
14,500 10/23/06
01/04/07
0
100
0 07/26/99
07/27/99
786
100
9.0 111.50
22,611
8,897
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 309
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting 300 06 0268 / 5376
Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
Blocks
DE PRIEST CPS
50,000 02/10/04
08/10/04
113,047
100
Lamps
5937 W MADISON ST
1,949.0
Work Type: Underpass Lighting
Fixtures
06/01/06
12/31/06
11,000 10/12/06
10/17/06
10,134
100
805 06 2349 / 8535
2010 N AUSTIN AVE
118.0
08/04/95
08/04/95
0 08/04/95
08/04/95
88,500
100
805 06 2571 / 8757
430 N MAYFIELD AVE
14.0
11/01/93
11/01/93
0 11/01/93
11/01/93
10,500
100
805 06 2570 / 8756
430 N MENARD AVE
14.0
11/01/93
11/01/93
0 11/01/93
11/01/93
10,500
100
805 06 2569 / 8755
425 N PARKSIDE AVE
16.0
11/04/93
11/04/93
0 11/04/93
11/04/93
12,000
100
805 06 2568 / 8754
420 N WALLER AVE
14.0
10/05/93
10/05/93
0 10/05/93
10/05/93
10,500
100
805 06 2374 / 8560
995 S CENTRAL AVE
24.0
06/11/93
06/11/93
0 06/11/93
06/11/93
18,000
100
805 06 2375 / 8561
995 S CENTRAL AVE
6.0
06/11/93
06/11/93
0 06/11/93
06/11/93
4,500
100
805 06 2398 / 8584
995 S CENTRAL AVE
6.0
06/11/93
06/11/93
0 06/11/93
06/11/93
4,500
100
805 06 2715 / 8901
995 S CENTRAL AVE
24.0
06/11/93
06/11/93
0 06/11/93
06/11/93
18,000
100
300 06 0217 / 5337
5837 W MADISON ST
181.0
12/12/03
12/15/03
10,174 12/03/03
12/08/03
11,970
100
Totals per Underpass Lighting
417.0
10,174
188,970
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 310
1/1/2008 AND 12/31/2008
Ward 29 Isaac Carothers CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 / 32040
N AUSTIN BLVD AND W LAKE ST
Work Type: New Signal 300 06 0283 / 5391
N CENTRAL AVE AND W DIVISION ST
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W HARRISON ST AND S LARAMIE AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N MELVINA AVE AND W GRAND AVE
Work Type: Signals 300 06 0096 / 5258
5937 W MADISON ST
Work Type: TSM Install
Locations 1.0
11/01/06
12/31/07
85,000 11/01/06
03/06/07
0
100
09/02/04
09/30/04
8,159 09/09/04
09/09/04
8,159
100
03/15/06
05/08/07
6,000 12/26/06
02/13/07
2,959
100
4,000 08/01/01
08/07/01
12,864
100
Locations .50
Locations .0
Crossings 1.0
Intersections 47.0
11/01/03
11/08/03
0 11/01/03
11/07/03
7,432
100
Locations
814 06 0070 / 16286
300 N CENTRAL AVE
1.0
02/21/95
02/21/95
0 02/21/95
02/21/95
107,398
100
814 06 0384 / 16572
400 N CENTRAL AVE
1.0
03/11/96
03/11/96
0 03/11/96
03/11/96
250,000
100
814 06 0387 / 16575
1200 N CENTRAL AVE
1.0
04/10/96
04/10/96
0 04/10/96
04/10/96
125,000
100
3.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 07 0029 / 5452
ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N AUSTIN BLVD
Totals per Traffic
0
482,398
Locations 8.0
10/23/06
01/04/07
2,800 10/23/06
01/04/07
0
105,959
513,812
Totals per Construction Phase
3,769,726
2,588,398
Totals for Ward 29
3,778,876
2,596,442
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 311
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32275
ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE
.0
03/01/07
10/31/07
48,000 01/26/07
02/23/07
7,389
100
300 06 0274 / 5382
ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
1,784
100
300 06 0308 / 5414
ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,237
100
210 06 0208 / 4451
W ADDISON ST AND N LAWNDALE AVE
.0
07/01/04
10/01/04
0
210 06 0243 / 4480
W BELMONT AVE AND N MILWAUKEE AVE
.0
01/08/07
01/26/07
Totals per Design/Engineering
.0
250 01/08/07 48,250
01/26/07
0
0
638
100
12,047
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 312
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE
4.0
11/05/01
11/05/01
1,029 10/04/01
10/04/01
824
100
300 03 0030 / 4901
ON N AVERS AVE FROM W GRAND AVE TO W LE MOYNE ST
8.0
11/01/04
11/10/04
3,000 10/18/04
10/20/04
1,833
100
300 07 0030 / 5453
ON N AVERS AVE FROM W NORTH AVE TO W WABANSIA AVE
5.0
04/18/06
11/18/06
2,200 09/19/06
09/29/06
2,200
100
300 09 / 33096
ON N KEATING AVE FROM W BELMONT AVE TO W SCHOOL ST
4.0
10/13/08
10/14/08
1,600 10/13/08
10/14/08
1,245
100
300 11 / 32219
ON N KEELER AVE FROM W ARMITAGE AVE TO W PALMER ST
54.0
12/12/07
12/18/07
27,246 12/12/07
12/18/07
34,841
100
300 09 / 33096
ON N KENTON AVE FROM W ROSCOE ST TO W ADDISON ST
8.0
10/15/08
10/17/08
3,200 10/15/08
10/17/08
2,460
100
300 03 0030 / 4901
ON N KEYSTONE AVE FROM W CORTLAND ST TO W ARMITAGE AVE
5.0
07/20/04
07/20/04
2,075 07/23/04
07/23/04
1,125
100
300 03 0030 / 4901
ON N KEYSTONE AVE FROM W GRAND AVE TO W NORTH AVE
8.0
11/01/04
11/10/04
3,000 10/18/04
10/20/04
1,833
100
300 09 / 33096
ON N KOLMAR AVE FROM W SCHOOL ST TO W ADDISON ST
12.0
10/13/08
10/14/08
4,800 10/13/08
10/14/08
3,840
100
300 11 / 32219
ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST
10.0
12/12/07
12/18/07
1,677 12/12/07
12/18/07
1,677
100
300 03 0030 / 4901
ON N LOWELL AVE FROM W ROSCOE ST TO W ADDISON ST
9.0
11/01/04
11/10/04
3,375 10/18/04
10/20/04
2,062
100
300 07 0030 / 5453
ON N MANGO AVE FROM W DIVERSEY AVE TO W GEORGE ST
4.0
04/18/06
11/18/06
1,600
300 03 0029 / 4900
ON N MARMORA AVE FROM W FULLERTON AVE TO W ALTGELD ST
5.0
04/26/04
05/02/04
2,013 05/01/04
300 07 0030 / 5453
ON N MARMORA AVE FROM W GEORGE ST TO W BELMONT AVE
14.0
04/18/06
11/18/06
300 07 0030 / 5453
ON N MENARD AVE FROM W DIVERSEY AVE TO W BELMONT AVE
18.0
04/18/06
11/18/06
300 07 0030 / 5453
ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE
16.0
04/18/06
300 07 0030 / 5453
ON N SPRINGFIELD AVE FROM W DICKENS AVE TO W FULLERTON AVE
15.0
300 06 0069 / 5233
ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE
300 03 0030 / 4901
ON W DRUMMOND PL FROM N LONG AVE TO N CENTRAL AVE
300 07 0030 / 5453
0
0
917
100
5,700
0
0
7,400
0
0
11/18/06
6,600
0
0
04/18/06
11/18/06
6,200 09/14/06
09/29/06
0
100
2.64
10/01/03
10/16/03
0 02/04/02
02/04/02
990
100
8.0
11/01/04
11/10/04
3,000 10/18/04
10/20/04
1,833
100
ON W MELROSE ST FROM N CICERO AVE TO N LAVERGNE AVE
8.0
04/18/06
11/18/06
3,400 01/10/07
01/10/07
1,513
100
300 03 0030 / 4901
ON W PARKER AVE FROM N LONG AVE TO N CENTRAL AVE
7.0
11/01/04
11/10/04
2,825 10/18/04
10/20/04
1,604
100
300 03 0030 / 4901
ON W SCHUBERT AVE FROM N LONG AVE TO N CENTRAL AVE
8.0
11/01/04
11/10/04
3,200 10/18/04
10/20/04
1,833
100
300 06 0069 / 5233
ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE
6.0
2,250 01/14/03
01/14/03
2,250
100
300 06 0122 / 5275
N AVERS AVE AND W WELLINGTON AVE
4.0
12/04/03
12/04/03
1,700 12/08/03
12/08/03
975
100
300 06 0122 / 5275
N HAMLIN AVE AND W GEORGE ST
5.0
12/04/03
12/04/03
1,875 12/08/03
12/08/03
975
100
300 03 0030 / 4901
2700 N AVERS AVE
5.0
11/01/04
11/10/04
1,875 10/18/04
10/20/04
1,146
100
300 06 0069 / 5233
2928 N AVERS AVE
1.0
06/09/02
06/09/02
210 06/06/02
06/06/02
203
100
300 06 0069 / 5233
2948 N AVERS AVE
1.0
06/09/02
06/09/02
210 06/06/02
06/06/02
203
100
300 06 0069 / 5233
2852 N HAMLIN AVE
1.0
07/15/02
07/15/02
210 07/12/02
07/12/02
203
100
300 06 0069 / 5233
2900 N HAMLIN AVE
1.0
07/15/02
07/15/02
210 07/12/02
07/12/02
203
100
300 03 0030 / 4901
2700 N HARDING AVE
5.0
11/01/04
11/10/04
1,875 10/18/04
10/20/04
1,145
100
05/01/04
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 313
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
2932 N HARDING AVE
1.0
10/24/02
10/24/02
300 07 0030 / 5453
1800-1900 N KEYSTONE AVE
.0
03/01/06
12/31/06
300 03 0030 / 4901
3300 N KILBOURN AVE
4.0
11/01/04
11/10/04
1,500 10/18/04
300 03 0030 / 4901
3100 N MAJOR AVE
5.0
11/01/04
11/10/04
300 03 0030 / 4901
3100 N PARKSIDE AVE
5.0
11/01/04
11/10/04
300 03 0030 / 4901
1400 N SPRINGFIELD AVE
4.0
11/01/04
302 00 0092 / 5774
2500-2599 N SPRINGFIELD AVE
4.0
300 06 0069 / 5233
3850 W HIRSCH ST
300 09 / 33096 300 09 / 33096
210 10/21/02
10/21/02
203
100
0
0
10/20/04
917
100
1,875 10/18/04
10/20/04
1,146
100
1,875 10/18/04
10/20/04
1,145
100
11/10/04
1,500 10/18/04
10/20/04
917
100
11/02/01
11/02/01
1,029 10/04/01
10/04/01
824
100
1.0
11/04/02
11/04/02
210 11/01/02
11/01/02
203
100
4233 W SCHOOL ST
1.0
10/20/08
10/20/08
400 10/20/08
10/20/08
278
100
4245 W SCHOOL ST
1.0
10/20/08
10/20/08
400 10/20/08
10/20/08
278
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
287.64
0
114,554
75,844
Fixtures
300 09 / 33096
ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
12.0
10/27/08
10/31/08
4,800 10/27/08
10/31/08
3,984
100
300 09 / 33096
ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE
11.0
10/27/08
10/31/08
4,400 10/27/08
10/31/08
3,652
100
300 09 / 33096
ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE
17.40
10/27/08
11/01/07
6,960 10/27/08
11/01/07
6,647
100
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
63.0
04/04/05
11/18/05
25,200 07/10/05
08/01/05
22,050
100
300 11 / 32219
ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD
13.0
11/01/07
12/01/07
5,400 09/26/07
10/31/07
3,919
100
300 07 0030 / 5453
1800-1900 N KEYSTONE AVE
.0
03/01/06
12/31/06
300 06 0122 / 5275
4200 W NORTH AVE
3.0
06/01/03
06/02/03
Totals per 400 Watt Changeout Totals per Lighting/Electrical
119.40
0 4,800 05/13/03
05/13/03
0
0
3,647
100
51,560
43,899
1,678,639
1,911,405
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 314
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0092 / 5774
3402 N HAMLIN AVE
1.0
0 03/29/01
03/29/01
236
100
805 06 1055 / 7241
2422 N HARDING AVE
1.0
02/03/95
02/03/95
0 02/03/95
02/03/95
300
100
805 06 1056 / 7242
2726 N HARDING AVE
1.0
01/27/95
01/27/95
0 01/27/95
01/27/95
300
100
805 06 1076 / 7262
3629 N HARDING AVE
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 1717 / 7903
1701 N KARLOV AVE
1.0
06/19/97
06/19/97
0 06/19/97
06/19/97
300
100
805 06 1393 / 7579
3213 N KEATING AVE
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 1256 / 7442
3521 N KEATING AVE
1.0
05/20/96
05/20/96
0 05/20/96
05/20/96
300
100
805 06 1197 / 7383
1509 N KEDVALE AVE
1.0
11/27/96
11/27/96
0 11/27/96
11/27/96
300
100
805 06 1427 / 7613
1523 N KEDVALE AVE
1.0
11/27/96
11/27/96
0 11/27/96
11/27/96
300
100
805 06 1213 / 7399
1555 N KEDVALE AVE
1.0
11/27/96
11/27/96
0 11/27/96
11/27/96
300
100
805 06 1158 / 7344
1634 N KEELER AVE
1.0
04/04/95
04/04/95
0 04/04/95
04/04/95
300
100
805 06 1184 / 7370
3823 N KEYSTONE AVE
1.0
08/28/96
08/28/96
0 08/28/96
08/28/96
300
100
805 06 2024 / 8210
2125 N KOSTNER AVE
1.0
08/08/95
08/08/95
0 08/08/95
08/08/95
300
100
805 06 0564 / 6750
1518 N PULASKI RD
1.0
07/11/95
07/11/95
0 07/11/95
07/11/95
300
100
805 06 0565 / 6751
1916 N PULASKI RD
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
805 06 0566 / 6752
1936 N PULASKI RD
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
805 06 0567 / 6753
1956 N PULASKI RD
1.0
04/12/95
04/12/95
0 04/12/95
04/12/95
300
100
300 06 0139 / 5289
3616 N PULASKI RD
1,505.0
03/01/06
09/01/06
32,831 05/05/06
05/19/06
45,472
100
302 00 0092 / 5774
3618 N PULASKI RD
39.0
0 01/25/01
01/23/02
6,834
100
805 06 1778 / 7964
2170 N SPRINGFIELD AVE
1.0
04/17/97
04/17/97
0 04/17/97
04/17/97
300
100
805 06 0677 / 6863
2441 N SPRINGFIELD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0443 / 6629
1621 N TRIPP AVE
1.0
06/10/96
06/10/96
0 06/10/96
06/10/96
300
100
805 06 0786 / 6972
3732 W ADDISON ST
1.0
09/19/95
09/19/95
0 09/19/95
09/19/95
300
100
805 06 0787 / 6973
4008 W ADDISON ST
1.0
02/17/95
02/17/95
0 02/17/95
02/17/95
300
100
805 06 0771 / 6957
4129 W ADDISON ST
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 0790 / 6976
4599 W ADDISON ST
1.0
08/28/96
08/28/96
0 08/28/96
08/28/96
300
100
302 00 0092 / 5774
3840 W ALTGELD ST
1.0
0 04/24/01
04/24/01
236
100
805 06 1740 / 7926
5625 W DIVERSEY AVE
1.0
06/12/97
06/12/97
0 06/12/97
06/12/97
300
100
805 06 0807 / 6993
3915 W FULLERTON AVE
1.0
10/18/96
10/18/96
0 10/18/96
10/18/96
300
100
805 06 0788 / 6974
3925 W FULLERTON AVE
1.0
10/18/96
10/18/96
0 10/18/96
10/18/96
300
100
805 06 1229 / 7415
3955 W FULLERTON AVE
1.0
10/18/96
10/18/96
0 10/18/96
10/18/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 315
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1180 / 7366
3975 W FULLERTON AVE
1.0
10/18/96
10/18/96
0 10/18/96
10/18/96
300
100
300 06 0139 / 5289
5402 W FULLERTON AVE
1,410.0
03/01/06
09/01/06
30,775 04/17/06
05/01/06
42,602
100
805 06 1604 / 7790
4124 W NORTH AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1788 / 7974
4200 W NORTH AVE
1.0
11/12/91
11/12/91
0 11/12/91
11/12/91
300
100
805 06 1510 / 7696
4212 W NORTH AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1512 / 7698
4220 W NORTH AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 1800 / 7986
3917 W PALMER ST
1.0
04/14/97
04/14/97
0 04/14/97
04/14/97
300
100
805 06 1771 / 7957
3921 W PALMER ST
1.0
04/14/97
04/14/97
0 04/14/97
04/14/97
300
100
805 06 1772 / 7958
3925 W PALMER ST
1.0
04/14/97
04/14/97
0 04/14/97
04/14/97
300
100
805 06 1780 / 7966
3927 W PALMER ST
1.0
04/17/97
04/17/97
0 04/17/97
04/17/97
300
100
805 06 0642 / 6828
4235 W SCHOOL ST
1.0
10/12/95
10/12/95
0 10/12/95
10/12/95
300
100
805 06 1779 / 7965
3902 W SHAKESPEARE AVE
1.0
04/17/97
04/17/97
0 04/17/97
04/17/97
300
100
805 06 0652 / 6838
4346 W SHAKESPEARE AVE
1.0
08/08/95
08/08/95
0 08/08/95
08/08/95
300
100
2,995.0
Totals per Alley Lighting/Lamps
5402 W FULLERTON AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
107,080
Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
63,606
1,200.0
06/01/07
12/31/07
35,238 07/10/07
09/15/07
35,238
100
0 04/30/02
05/03/02
12,910
100
6.40
0 09/23/99
09/23/99
1,053
100
1.0
0 04/10/01
04/10/01
471
100
3.50
0 06/10/99
06/10/99
1,229
100
Installations
3618 N PULASKI RD
709.0
Fixtures
Work Type: Flood Light Install 300 06 0167 / 5306
ON N SPRINGFIELD AVE FROM W POTOMAC AVE TO W LE MOYNE ST
302 00 0092 / 5774
N SPRINGFIELD AVE AND W SHAKESPEARE AVE
300 06 0167 / 5306
W DIVERSEY AVE AND N AVERS AVE
300 06 0069 / 5233
1435 N KARLOV AVE
2.0
970 07/11/02
07/11/02
1,432
100
300 06 0167 / 5306
1901 N KEELER AVE
1.0
0 12/01/99
12/01/99
351
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0122 / 5275
3811 W SCHOOL ST
13.90
970
4,535
Installations 1.0
10/15/03
10/16/03
4,600 10/17/03
10/17/03
1,764
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 316
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 09 / 33096
ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
21.0
12/19/08
12/31/08
28,350 12/19/08
12/31/08
28,400
100
300 09 / 33096
ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE
20.0
12/19/08
12/31/08
27,000 12/19/08
12/31/08
21,249
100
300 09 / 33096
ON W ARMITAGE AVE FROM N PULASKI RD TO N SPRINGFIELD AVE
5.0
11/20/08
11/26/08
6,750 11/20/08
11/26/08
6,800
100
300 09 / 33096
ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE
33.93
12/22/08
01/16/09
45,806 12/22/08
01/16/09
46,145
100
300 07 0030 / 5453
ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE
14.0
04/18/06
11/18/06
19,300
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
67.0
04/04/05
11/18/05
90,450 07/10/05
300 11 / 32219
ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD
13.0
11/01/07
12/01/07
17,550 09/26/07
300 07 0030 / 5453
1800-1900 N KEYSTONE AVE
.0
03/01/06
12/31/06
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting
173.93
.0
Work Type: Residential Regrouping
Lamps
300 06 0270 / 5378
3348 N MILWAUKEE AVE
Work Type: Residntl Staggered Lighting
.0
04/01/05
03/01/08
12/01/08
78,882
100
10/31/07
11,757
100
0
0
0
235,206
193,232
0 04/01/05
0
0
0
0
0
Blocks
300 05 0030 / 5145
KOSCIUSZKO (THADEUZ)
.0
04/01/05
300 06 / 32275
ON N AVERS AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
04/01/07
12/31/07
300 11 / 32219
ON N HAMLIN AVE FROM W GRAND AVE TO W NORTH AVE
1.0
04/16/07
300 05 0030 / 5145
ON W SCHUBERT AVE FROM N CENTRAL AVE TO N MENARD AVE
2.0
08/10/05
300 06 0298 / 5405
ON W SCHUBERT AVE FROM N MENARD AVE TO N AUSTIN AVE
2.0
300 06 0308 / 5414
ON W WRIGHTWOOD AVE FROM N CENTRAL AVE TO N AUSTIN AVE
300 07 0030 / 5453
ON W WRIGHTWOOD AVE FROM N MENARD AVE TO N AUSTIN AVE
300 07 0030 / 5453
Project has been completed Note Last Updated on 25-AUG-06 1800-1900 N KEYSTONE AVE
Totals per Residntl Staggered Lighting
0
08/01/05
Blocks
KOSCIUSZKO (THADEUZ)
300 05 0030 / 5145
0
0 04/01/05
0
0
90,478
100
09/07/07
50,000
100
10/21/05
123,228
100
0 08/08/05
10/21/05
73,406
100
12/31/06
124,400 06/07/06
08/01/06
75,560
100
06/12/06
08/18/06
75,000 06/07/06
08/15/06
51,456
100
03/01/06
12/31/06
0
0
0
649,143
464,128
217,243 03/23/07
08/17/07
08/15/07
62,500 04/09/07
11/18/05
170,000 08/15/05
06/25/05
08/01/05
1.74
03/16/06
1.0 .0 9.74
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 317
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 06 0235 / 5349
ON N KILBOURN AVE FROM W ROSCOE ST TO W ADDISON ST
2.0
08/28/03
10/28/03
154,477 08/28/03
10/17/03
137,993
100
300 06 0267 / 5375
ON N LOTUS AVE FROM W FULLERTON AVE TO W ALTGELD ST
2.0
05/20/04
07/20/04
146,035 06/02/04
09/16/04
127,621
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
4.0
300,512
265,614
Locations
302 00 0092 / 5774
1900 N TRIPP AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
1910 N TRIPP AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
1922 N TRIPP AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
1940 N TRIPP AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
1948 N TRIPP AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
5733 W DIVERSEY AVE
1.0
0 02/01/01
02/01/01
378
100
302 00 0092 / 5774
5734 W DIVERSEY AVE
1.0
0 02/01/01
02/01/01
378
100
302 00 0092 / 5774
5737 W DIVERSEY AVE
1.0
0 04/20/01
04/20/01
378
100
302 00 0092 / 5774
4300 W SHAKESPEARE AVE
1.0
0 04/10/01
04/10/01
378
100
302 00 0092 / 5774
4324 W SHAKESPEARE AVE
1.0
0 04/10/01
04/10/01
378
100
302 00 0092 / 5774
4336 W SHAKESPEARE AVE
1.0
0 04/10/01
04/10/01
378
100
302 00 0092 / 5774
4352 W SHAKESPEARE AVE
1.0
0 04/10/01
04/10/01
378
100
Totals per Short Arm Installs - Residntl
12.0
0
4,536
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 318
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 09 / 33096
ON N CENTRAL AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
21.0
10/23/08
10/28/08
6,300 10/23/08
10/28/08
4,410
100
300 09 / 33096
ON N CENTRAL AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE
20.0
10/20/08
10/23/08
6,000 10/20/08
10/23/08
4,200
100
302 00 0076 / 5764
ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE
31.16
09/01/00
12/31/00
300 09 / 33096
ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST
3.50
0
0
300 09 / 33096
ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE
30.45
10/27/08
10/31/08
9,135 10/27/08
10/31/08
7,856
100
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
96.50
04/04/05
11/18/05
24,125 06/27/05
07/15/05
15,000
100
302 00 0076 / 5764
ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE
50.0
09/01/00
12/31/00
300 11 / 32219
ON W NORTH AVE FROM N HAMLIN AVE TO N LOWELL AVE
50.0
06/10/07
07/10/07
302 00 0076 / 5764
ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE
69.66
09/01/00
12/31/00
300 11 / 32219
ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N PULASKI RD
13.0
07/10/07
08/01/07
300 07 0030 / 5453
1800-1900 N KEYSTONE AVE
.0
03/01/06
12/31/06
300 06 0108 / 5263
4200 W NORTH AVE
3.0
05/21/03
05/21/03
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0098 / 5259
1800-2300 N PULASKI RD
Work Type: Strt Lighting 300 06 0274 / 5382
ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE
Work Type: Traffic Signal Regrouping
0
530
700
388.27
0 11,000 06/10/07
850 07/10/07
0 3,250 07/10/07
100
1,184 08/01/07
0 750 07/01/03
11,000
07/03/03
61,260
3,250
100
0
0
630
100
48,910
Blocks 5.0
04/01/01
01/15/03
0 04/16/01
06/15/02
515,969
100
06/20/06
08/31/06
75,000 06/20/06
08/31/06
30,628
100
Blocks 1.0
Lamps
300 06 0139 / 5289
3616 N PULASKI RD
774.0
03/01/04
12/01/04
4,024 10/18/06
10/19/06
8,429
100
300 06 0238 / 5352
NEW WARD ADDRESS IS 3348 N. MILWAUKEE Note Last Updated on 30-OCT-06 5402 W FULLERTON AVE 1,522.0
06/01/06
12/31/06
8,500 10/19/06
10/23/06
7,914
100
Totals per Traffic Signal Regrouping
2,296.0
12,524
16,343
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 319
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2639 / 8825
1895 N KARLOV AVE
8.0
10/25/94
10/25/94
0 10/25/94
10/25/94
6,000
100
805 06 2917 / 9103
1893 N KEELER AVE
12.0
03/16/94
03/16/94
0 03/16/94
03/16/94
9,000
100
805 06 2638 / 8824
1895 N KILDARE AVE
8.0
12/20/94
12/20/94
0 12/20/94
12/20/94
6,000
100
300 06 0117 / 5271
2300 N PULASKI RD
302 00 0072 / 5760
2300 N PULASKI RD
1.0
0 03/09/00
03/15/00
7,626
100
300 06 0217 / 5337
3616 N PULASKI RD
395.0
12/16/03
12/19/03
22,202 01/28/04
02/06/04
23,423
100
805 06 2752 / 8938
1898 N SPRINGFIELD AVE
10.0
06/29/94
06/29/94
0 06/29/94
06/29/94
7,500
100
805 06 2358 / 8544
1890 N TRIPP AVE
8.0
06/04/96
06/04/96
0 06/04/96
06/04/96
6,000
100
302 00 0071 / 5759
3850 W ARMITAGE AVE
0 10/17/98
10/22/98
3,492
100
805 06 2654 / 8840
3899 W ARMITAGE AVE
4.0
05/08/92
05/08/92
0 05/08/92
05/08/92
3,000
100
805 06 2633 / 8819
3925 W DICKENS AVE
8.0
12/14/94
12/14/94
0 12/14/94
12/14/94
6,000
100
805 06 2659 / 8845
4565 W ROSCOE ST
4.0
04/19/93
04/19/93
0 04/19/93
04/19/93
3,000
100
805 06 2207 / 8393
4001 W WRIGHTWOOD AVE
10.0
12/31/95
12/31/95
0 12/31/95
12/31/95
7,500
100
Totals per Underpass Lighting
12.0
480.0
52,265
74,467
2,235
90,776
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 320
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Locations
Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305
4100 W GRAND AVE
1.0
03/15/01
04/15/01
15,000 06/13/01
06/15/01
11,165
100
Locations
Work Type: LED Signal Head Install 210 06 0130 / 4389
N KEELER AVE AND W ARMITAGE AVE
1.0
0 02/26/02
02/26/02
7,324
90
210 06 0130 / 4389
N PULASKI RD AND W ARMITAGE AVE
1.0
0 02/26/02
02/26/02
10,074
100
2.0
0
Totals per LED Signal Head Install
17,398
Locations
Work Type: Left Turn Arrow 210 06 / 32040
N CENTRAL AVE AND W DIVERSEY AVE
.0
11/01/06
12/31/07
42,500
0
0
210 06 0257 / 4493
N CENTRAL AVE AND W FULLERTON AVE
.50
09/15/06
08/20/07
58,700 01/17/07
04/17/07
0
100
210 06 0256 / 4492
No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07 Awaiting ADA work. Note Last Updated on 21-JUN-07 W BELMONT AVE AND N CENTRAL AVE
.50
09/01/05
06/30/07
61,036 01/02/07
10/19/07
0
100
210 06 0073 / 4337
Awaiting ADA work. Note Last Updated on 21-JUN-07 1600 N PULASKI RD
1.0
06/13/02
09/01/02
50,000 06/13/02
02/07/03
60,838
100
Totals per Left Turn Arrow
Work Type: New Signal
2.0
212,236
Locations
210 06 0208 / 4451
W ADDISON ST AND N LAWNDALE AVE
.50
12/01/05
06/30/06
210 06 0131 / 4390
W FULLERTON AVE AND N AVERS AVE
.50
07/01/01
12/01/01
1.0
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W BELMONT AVE AND N MILWAUKEE AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N KOSTNER AVE AND W PALMER BLVD
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
3616 N PULASKI RD
60,838
112,500 85,000 05/31/01
0 08/02/01
197,500
47,668
100
47,668
Locations .0
03/15/06
05/08/07
6,000 01/12/07
02/13/07
4,070
100
2,000 07/20/01
04/08/02
527
100
0 11/04/03
11/10/03
7,748
100
Crossings .50
Intersections 49.0
11/15/03
11/21/03
590,586
692,094
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 321
1/1/2008 AND 12/31/2008
Ward 30 Ariel E. Reboyras CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
814 06 0341 / 16539
2800 N HAMLIN AVE
1.0
04/15/97
04/15/97
0 04/15/97
12/15/97
129,900
100
210 06 0072 / 4336
3200 N KILPATRICK AVE
1.0
06/06/00
10/10/00
150,000 06/06/00
10/10/00
95,170
100
814 06 0383 / 16571
3600 N PULASKI RD
1.0
09/19/96
09/19/96
0 09/19/96
09/19/96
123,824
100
814 06 0312 / 16524
3850 N PULASKI RD
1.0
11/21/91
11/21/91
0 11/21/91
11/21/91
106,875
100
814 06 0125 / 16339
3869 N PULASKI RD
1.0
10/29/93
10/29/93
0 10/29/93
10/29/93
79,020
100
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 07 0030 / 5453
ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
300 07 0030 / 5453
1800-1900 N KEYSTONE AVE
150,000
534,789
Locations 0
0
7,892
100
0
0
0
7,850
7,892
Totals per Construction Phase
2,269,224
2,603,499
Totals for Ward 30
2,317,474
2,615,546
Totals per Traffic Equipment Painting
1.50
04/18/06
11/18/06
20.50
04/04/05
11/18/05
.0
03/01/06
12/31/06
22.0
300 7,550 06/27/05
07/15/05
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 322
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE
2.0
04/01/08
08/30/08
130,000 05/19/08
300 06 0308 / 5414
ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE
.0
02/01/06
07/31/06
0 02/01/06
300 06 / 32277
ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE
2.0
04/01/08
08/30/08
130,000 05/19/08
300 06 0274 / 5382
ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE
.0
07/01/04
12/31/04
210 06 0243 / 4480
W BELMONT AVE AND N MILWAUKEE AVE
.0
01/08/07
01/26/07
300 06 0292 / 5399
1833 N CICERO AVE
210 06 0127 / 4386
4640 W DIVERSEY AVE
300 06 0292 / 5399
4821 W FULLERTON AVE
Totals per Design/Engineering
1.0
0
20
07/31/06
354
100
0
20
0 03/22/05
05/06/05
818
100
250 01/08/07
01/26/07
638
100
2,500 03/30/05
05/01/05
0
100
.0
12/15/05
03/15/06
0 12/15/05
02/16/06
1,275
100
1.0
02/23/05
03/04/05
1,000 01/20/05
05/19/05
1,000
100
6.0
263,750
4,085
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 323
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 11 / 32219
ON N KOSTNER AVE FROM W ARMITAGE AVE TO W PALMER ST
10.0
12/12/07
12/18/07
1,677 12/12/07
12/18/07
1,677
100
300 06 0069 / 5233
ON W SHAKESPEARE AVE FROM N LAMON AVE TO N CICERO AVE
5.0
03/17/03
03/17/03
2,000 03/14/03
03/14/03
1,875
100
300 06 0069 / 5233
ON W WABANSIA AVE FROM N PULASKI RD TO N LOWELL AVE
6.0
2,250 01/14/03
01/14/03
2,250
100
300 06 0069 / 5233
2200 N KENNETH AVE
5.0
1,050 04/25/02
04/25/02
1,015
100
302 00 0092 / 5774
3100-3199 N KENOSHA AVE
8.0
0 09/28/01
09/28/01
1,646
100
300 06 0069 / 5233
2600 N KILBOURN AVE
8.0
06/07/02
06/07/02
1,680 06/04/02
06/04/02
1,624
100
300 06 0069 / 5233
2000 N LAWLER AVE
5.0
01/10/02
01/10/02
1,050 01/07/02
01/07/02
1,015
100
300 06 0069 / 5233
2458 N LOWELL AVE
1.0
11/04/02
11/04/02
210 11/01/02
11/01/02
203
100
300 06 0069 / 5233
4353 W ALTGELD ST
1.0
11/04/02
11/04/02
210 11/01/02
11/01/02
203
100
300 06 0069 / 5233
4502 W FULLERTON AVE
894.0
350,000 04/18/03
06/30/03
197,004
100
300 06 0122 / 5275
4502 W FULLERTON AVE
604.0
07/01/03
08/01/03
238,250 05/10/03
06/30/03
130,493
100
300 06 0069 / 5233
4800 W WOLFRAM ST
5.0
04/29/02
04/29/02
1,050 04/25/02
04/25/02
1,015
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
04/29/02
04/29/02
1,552.0
599,427
340,020
Fixtures
300 06 0122 / 5275
ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE
171.0
06/11/04
06/16/04
68,400 05/25/04
06/21/04
68,400
100
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
38.50
04/04/05
11/18/05
15,400 07/10/05
08/01/05
13,475
100
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
63.0
04/04/05
11/18/05
25,200 07/10/05
08/01/05
22,050
100
300 03 0031 / 4902
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
91.50
05/18/04
05/25/04
36,600 05/15/04
06/01/04
34,037
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
364.0
145,600
137,962
2,156,355
1,679,392
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 324
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0840 / 7026
2811 N CENTRAL AVE
1.0
03/10/95
03/10/95
0 03/10/95
03/10/95
300
100
805 06 1758 / 7944
2940 N CICERO AVE
1.0
05/09/97
05/09/97
0 05/09/97
05/09/97
300
100
805 06 1759 / 7945
2958 N CICERO AVE
1.0
05/09/97
05/09/97
0 05/09/97
05/09/97
300
100
805 06 1738 / 7924
3002 N CICERO AVE
1.0
06/12/97
06/12/97
0 06/12/97
06/12/97
300
100
805 06 0416 / 6602
3032 N CICERO AVE
1.0
08/05/96
08/05/96
0 08/05/96
08/05/96
300
100
805 06 1760 / 7946
3056 N CICERO AVE
1.0
05/09/97
05/09/97
0 05/09/97
05/09/97
300
100
805 06 0332 / 6518
3134 N DAVLIN CT
1.0
05/04/95
05/04/95
0 05/04/95
05/04/95
300
100
805 06 1382 / 7568
2332 N KEATING AVE
1.0
08/12/96
08/12/96
0 08/12/96
08/12/96
300
100
805 06 1196 / 7382
2034 N KENNETH AVE
1.0
04/01/96
04/01/96
0 04/01/96
04/01/96
300
100
805 06 1166 / 7352
2054 N KENNETH AVE
1.0
06/19/96
06/19/96
0 06/19/96
06/19/96
300
100
302 00 0092 / 5774
3157 N KENOSHA AVE
1.0
0 09/29/01
09/29/01
236
100
805 06 2028 / 8214
2635 N KILDARE AVE
1.0
04/05/95
04/05/95
0 04/05/95
04/05/95
300
100
805 06 2008 / 8194
2233 N KOSTNER AVE
1.0
09/29/95
09/29/95
0 09/29/95
09/29/95
300
100
805 06 1996 / 8182
3015 N KOSTNER AVE
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 2017 / 8203
3215 N KOSTNER AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 1998 / 8184
3257 N KOSTNER AVE
1.0
06/02/95
06/02/95
0 06/02/95
06/02/95
300
100
805 06 1961 / 8147
2937 N LONG AVE
1.0
04/03/96
04/03/96
0 04/03/96
04/03/96
300
100
805 06 1859 / 8045
2839 N LUNA AVE
1.0
04/03/96
04/03/96
0 04/03/96
04/03/96
300
100
805 06 1860 / 8046
2858 N LUNA AVE
1.0
01/25/96
01/25/96
0 01/25/96
01/25/96
300
100
805 06 1743 / 7929
4521 W ARMITAGE AVE
1.0
05/21/97
05/21/97
0 05/21/97
05/21/97
300
100
805 06 1744 / 7930
4531 W ARMITAGE AVE
1.0
05/21/97
05/21/97
0 05/21/97
05/21/97
300
100
805 06 1745 / 7931
4551 W ARMITAGE AVE
1.0
05/21/97
05/21/97
0 05/21/97
05/21/97
300
100
302 00 0092 / 5774
4502 W FULLERTON AVE
30.0
0 01/25/01
10/31/01
7,070
100
805 06 1112 / 7298
4616 W FULLERTON AVE
1.0
08/10/95
08/10/95
0 08/10/95
08/10/95
300
100
805 06 1651 / 7837
4821 W MEDILL AVE
1.0
07/29/97
07/29/97
0 07/29/97
07/29/97
300
100
805 06 1929 / 8115
5038 W NELSON ST
1.0
09/06/96
09/06/96
0 09/06/96
09/06/96
300
100
805 06 0634 / 6820
4344 W SCHOOL ST
1.0
08/07/95
08/07/95
0 08/07/95
08/07/95
300
100
805 06 0618 / 6804
5021 W SCHUBERT AVE
1.0
03/14/96
03/14/96
0 03/14/96
03/14/96
300
100
805 06 0619 / 6805
5301 W SCHUBERT AVE
1.0
12/03/96
12/03/96
0 12/03/96
12/03/96
300
100
805 06 0537 / 6723
4819 W WELLINGTON AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
300
100
805 06 0471 / 6657
4635 W WRIGHTWOOD AVE
1.0
02/02/95
02/02/95
0 02/02/95
02/02/95
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 325
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
4502 W FULLERTON AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4502 W FULLERTON AVE
Work Type: Flood Light Install
Installations 60.0
0
16,006
Lamps 1,016.0
06/01/07
12/31/07
29,911 08/18/07
01/15/08
29,911
100
0 05/24/02
05/27/02
16,770
100
Installations 921.0
Fixtures
300 06 0167 / 5306
ON N KEATING AVE FROM W DIVERSEY AVE TO W BELMONT AVE
14.0
0 09/24/99
09/24/99
2,444
100
300 06 0167 / 5306
ON N KILPATRICK AVE FROM W DIVERSEY AVE TO W BARRY AVE
9.0
0 09/24/99
09/24/99
1,504
100
302 00 0092 / 5774
W BELDEN AVE AND N LA CROSSE AVE
1.0
0 04/04/01
04/04/01
471
100
300 06 0167 / 5306
2800 N KEATING AVE
1.0
0 09/24/99
09/24/99
351
100
300 06 0167 / 5306
2900 N KEATING AVE
1.0
0 09/04/99
09/24/99
351
100
300 06 0167 / 5306
3000 N KEATING AVE
1.0
0 09/24/99
09/24/99
351
100
300 06 0167 / 5306
2800 N KILPATRICK AVE
1.0
0 09/27/99
09/27/99
351
100
300 06 0167 / 5306
2900 N KILPATRICK AVE
1.0
0 09/27/99
09/27/99
351
100
300 06 0167 / 5306
3000 N KILPATRICK AVE
1.0
0 09/27/99
09/27/99
351
100
300 06 0167 / 5306
3222 N KOSTNER AVE
1.0
0 09/03/99
09/03/99
351
100
302 00 0092 / 5774
2248 N LAMON AVE
1.0
0 05/09/01
05/09/01
471
100
300 06 0167 / 5306
4220 W BARRY AVE
1.0
0 04/17/99
04/17/99
351
100
302 00 0092 / 5774
4816 W BARRY AVE
1.0
0 02/06/01
02/06/01
471
100
302 00 0092 / 5774
4802 W MONTANA ST
1.0
0 02/14/01
02/14/01
471
100
302 00 0092 / 5774
4010 W NELSON ST
1.0
0 02/08/01
02/08/01
471
100
302 00 0092 / 5774
4340 W WELLINGTON AVE
1.0
0 05/01/01
05/01/01
471
100
302 00 0092 / 5774
4352 W WELLINGTON AVE
1.0
0 05/01/01
05/01/01
471
100
302 00 0092 / 5774
4802 W WOLFRAM ST
1.0
0 02/01/01
02/01/01
471
100
Totals per Flood Light Install
39.0
0
10,524
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 326
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts
Installations
300 06 0292 / 5399
1833 N CICERO AVE
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
300 06 0292 / 5399
4821 W FULLERTON AVE
.0
03/01/05
12/31/05
0 06/27/05
06/27/05
0
100
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
.0
0
0
Fixtures
300 06 0122 / 5275
ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE
135.0
06/16/04
06/30/04
182,250 06/11/04
07/07/04
113,051
100
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
31.0
04/04/05
11/18/05
41,850 07/10/05
07/15/05
26,500
100
300 09 / 33097
ON W ARMITAGE AVE FROM N KOSTNER AVE TO W GRAND AVE
46.0
07/07/08
08/01/08
62,700 06/27/08
07/07/08
47,358
100
300 07 0030 / 5453
ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE
14.0
04/18/06
11/18/06
19,300
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
67.0
04/04/05
11/18/05
90,450 07/10/05
300 03 0031 / 4902
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
77.0
05/26/04
06/10/04
103,950 05/25/04
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
4502 W FULLERTON AVE
Work Type: Residntl Staggered Lighting
370.0
78,882
100
07/07/04
81,642
100
347,433
0
0
Lamps .0
03/01/08
12/01/08
0
Blocks
ON N KILPATRICK AVE FROM W PALMER ST TO W FULLERTON AVE
.0
05/04/08
12/31/08
300 06 0308 / 5414
ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE
1.0
08/25/06
10/25/06
300 06 / 32277
ON N LOWELL AVE FROM W PALMER ST TO W FULLERTON AVE
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON W GEORGE ST FROM N LAMON AVE TO N LAVERGNE AVE
1.0
06/30/05
08/01/05
300 06 0298 / 5405
ON W WOLFRAM ST FROM N LAMON AVE TO N LAVERGNE AVE
1.0
06/30/05
08/01/05
300 09 / 33097
ON W WOLFRAM ST FROM N LAVERGNE AVE TO N LARAMIE AVE
1.0 4.0
214,842
Work Type: Residntl Strt Lighting/Lamps
0
08/01/05
500,500
300 06 / 32277
Totals per Residntl Staggered Lighting
0
0
0
0
04/27/07
20,179
100
0
0
0 08/08/05
10/07/05
58,082
100
0 08/08/05
10/07/05
58,082
100
130,000 04/01/08
12/01/08
0
0
84,842 09/05/06
136,343
Blocks
300 06 0235 / 5349
ON W DRUMMOND PL FROM N CICERO AVE TO N LAVERGNE AVE
2.0
08/01/03
10/01/03
159,534 07/31/03
10/17/03
144,080
100
300 06 0267 / 5375
ON W GEORGE ST FROM N CICERO AVE TO N LAMON AVE
1.0
09/27/04
11/27/04
97,526 10/04/04
11/17/04
63,482
100
300 06 0267 / 5375
ON W WOLFRAM ST FROM N CICERO AVE TO N LAMON AVE
1.0
09/15/04
11/15/04
97,526 10/04/04
11/17/04
63,483
100
Totals per Residntl Strt Lighting/Lamps
4.0
354,586
271,045
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 327
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
W BELDEN AVE AND N LAMON AVE
1.0
0 06/01/01
06/01/01
378
100
302 00 0092 / 5774
3000 N KARLOV AVE
1.0
0 04/10/01
04/10/01
378
100
302 00 0092 / 5774
3001 N KARLOV AVE
1.0
0 02/08/01
02/08/01
378
100
302 00 0092 / 5774
3101 N KARLOV AVE
1.0
0 02/08/01
02/08/01
378
100
302 00 0092 / 5774
2300 N KILPATRICK AVE
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
2210 N LA CROSSE AVE
1.0
0 04/03/01
04/03/01
378
100
302 00 0092 / 5774
2226 N LA CROSSE AVE
1.0
0 04/03/01
04/03/01
378
100
302 00 0092 / 5774
2242 N LA CROSSE AVE
1.0
0 04/03/01
04/03/01
378
100
302 00 0092 / 5774
2250 N LAMON AVE
1.0
0 06/01/01
06/01/01
378
100
302 00 0092 / 5774
4816 W BARRY AVE
1.0
0 02/01/01
02/01/01
378
100
302 00 0092 / 5774
4900 W DEMING PL
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
5100 W DEMING PL
1.0
0 03/14/01
03/14/01
378
100
302 00 0092 / 5774
4002 W NELSON ST
1.0
0 02/08/01
02/08/01
378
100
302 00 0092 / 5774
4030 W NELSON ST
1.0
0 04/10/01
04/10/01
378
100
302 00 0092 / 5774
4100 W NELSON ST
1.0
0 02/08/01
02/08/01
378
100
302 00 0092 / 5774
5055 W WRIGHTWOOD AVE
1.0
0 03/01/01
03/01/01
378
100
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
16.0
0
6,048
Locations
300 03 0031 / 4902
ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE
6.0
06/04/04
06/28/04
1,425 05/25/04
06/20/04
0
100
300 06 0108 / 5263
ON N CICERO AVE FROM W ARMITAGE AVE TO W BELMONT AVE
194.0
06/04/04
06/28/04
55,325 05/25/04
06/30/04
44,136
100
302 00 0077 / 5765
ON N CICERO AVE FROM W BARRY AVE TO W GRAND AVE
160.0
0 07/06/99
07/23/99
13,979
100
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
31.0
04/04/05
11/18/05
7,750 06/27/05
07/15/05
6,324
100
302 00 0076 / 5764
ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE
6.84
09/01/00
12/31/00
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
96.50
04/04/05
11/18/05
302 00 0076 / 5764
ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE
50.0
09/01/00
12/31/00
300 03 0031 / 4902
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
101.0
05/10/04
06/04/04
302 00 0076 / 5764
ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE
1.62
09/01/00
12/31/00
Totals per Strt Light Pole Painting
646.96
0 24,125 06/27/05
116 07/15/05
0 27,425 05/10/04
15,000
100
850 06/04/04
24,084
0
28
116,050
104,517
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 328
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting
Blocks
300 06 0297 / 5404
KELVYN PARK CPS
1.0
300 06 0274 / 5382
ON W GEORGE ST FROM N LONG AVE TO N CENTRAL AVE
2.0
300 06 0204 / 5327
3100 N KENOSHA AVE
4.0
12/01/03
10/17/01
12/31/04
10/17/01
7.0
Totals per Strt Lighting
Work Type: Underpass Lighting
28,973 06/23/03
06/25/04
28,973
100
150,000 10/13/04
12/01/04
119,418
100
840 09/29/01
09/29/01
1,029
100
179,813
149,420
Fixtures
805 06 2111 / 8297
1805 N KOSTNER AVE
8.0
03/16/94
03/16/94
0 03/16/94
03/16/94
6,000
100
805 06 2921 / 9107
4695 W ARMITAGE AVE
4.0
03/02/94
03/02/94
0 03/02/94
03/02/94
3,000
100
805 06 2908 / 9094
4300 W BELMONT AVE
4.0
12/09/93
12/09/93
0 12/09/93
12/09/93
3,000
100
805 06 2660 / 8846
4625 W BELMONT AVE
4.0
04/19/93
04/19/93
0 04/19/93
04/19/93
3,000
100
805 06 2661 / 8847
4699 W DIVERSEY AVE
4.0
04/19/93
04/19/93
0 04/19/93
04/19/93
3,000
100
805 06 2632 / 8818
4001 W FULLERTON AVE
6.0
05/02/92
05/02/92
0 05/02/92
05/02/92
4,500
100
302 00 0071 / 5759
4030 W FULLERTON AVE
0 10/24/98
10/29/98
8,146
100
300 06 0217 / 5337
4502 W FULLERTON AVE
278.0
08/20/04
08/31/04
15,626 04/12/04
04/16/04
14,972
100
805 06 2919 / 9105
4569 W FULLERTON AVE
4.0
05/07/92
05/07/92
0 05/07/92
05/07/92
3,000
100
302 00 0071 / 5759
4600 W FULLERTON AVE
0 10/28/98
11/05/98
8,146
100
805 06 2257 / 8443
4698 W GRAND AVE
26.0
09/02/96
09/02/96
0 09/02/96
09/02/96
19,500
100
805 06 2918 / 9104
4860 W GRAND AVE
10.0
03/20/94
03/20/94
0 03/20/94
03/20/94
7,500
100
302 00 0070 / 5758
4100 W WRIGHTWOOD AVE
0 10/31/97
11/07/97
10,130
100
805 06 2103 / 8289
4100 W WRIGHTWOOD AVE
16.0
11/07/97
11/07/97
0 11/07/97
11/07/97
12,000
100
805 06 2656 / 8842
4598 W WRIGHTWOOD AVE
10.0
12/14/94
12/14/94
0 12/14/94
12/14/94
7,500
100
Totals per Underpass Lighting
374.0
15,626
113,394
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 329
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305
4800 W DICKENS AVE
Work Type: Left Turn Arrow
Locations 1.0
10/27/00
10/30/00
15,000 10/27/00
10/30/00
17,592
100
0
0
11/16/05
93,454
100
Locations
210 06 / 32040
N CENTRAL AVE AND W DIVERSEY AVE
.0
11/01/06
12/31/07
42,500
210 06 0222 / 4462
W ARMITAGE AVE AND N CICERO AVE
1.0
10/01/05
11/01/05
68,000 06/27/05
210 06 0073 / 4337
2800 N CICERO AVE
1.0
04/15/03
05/13/03
77,316 04/14/03
79,824
95
210 06 0127 / 4386
4640 W DIVERSEY AVE
1.0
11/01/06
12/01/06
75,000 01/16/07
26,078
75
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0073 / 4337
2400 N PULASKI RD
Work Type: Pedestrian Countdown Signal Install 210 06 0243 / 4480
W BELMONT AVE AND N MILWAUKEE AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N KOSTNER AVE AND W PALMER BLVD
Work Type: Signals 300 06 0096 / 5258
4502 W FULLERTON AVE
Work Type: TSM Install
3.0
262,816
199,356
Locations 1.0
11/15/02
01/15/03
150,000 09/12/02
01/30/03
204,580
100
03/15/06
05/08/07
6,000 01/12/07
02/13/07
4,070
100
2,000 07/20/01
04/08/02
527
100
0 11/05/03
11/12/03
4,427
100
Locations .0
Crossings .50
Intersections 28.0
11/15/03
11/21/03
Locations
300 06 0078 / 5241
N LAMON AVE AND W FULLERTON AVE
1.0
11/01/02
01/31/03
25,000 11/02/02
12/03/02
25,000
100
210 06 0010 / 4285
2800 N KILBOURN AVE
1.0
08/01/98
12/01/98
150,000 08/03/98
10/19/99
108,833
100
814 06 0360 / 16554
2200 N PULASKI RD
1.0
08/01/96
08/01/96
0 08/01/96
03/26/97
126,851
100
814 06 0076 / 16292
4640 W DIVERSEY AVE
1.0
12/19/90
12/19/90
0 12/19/90
12/19/90
113,617
100
4.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
175,000
Locations
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
13.0
04/04/05
11/18/05
300 07 0030 / 5453
ON W DIVERSEY AVE FROM N LONG AVE TO N MAJOR AVE
1.50
04/18/06
11/18/06
300 05 0031 / 5146
ON W DIVERSEY AVE FROM N PULASKI RD TO N CENTRAL AVE
20.50
04/04/05
11/18/05
Totals per Traffic Equipment Painting
374,301
35.0
4,850 06/27/05
07/15/05
300 7,550 06/27/05 12,700
07/15/05
2,652
100
0
0
7,892
100
10,544
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 330
1/1/2008 AND 12/31/2008
Ward 31 Ray Suarez CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Traffic Totals per Traffic
623,516
815,396
Totals per Construction Phase
2,779,871
2,494,788
Totals for Ward 31
3,043,621
2,498,872
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 331
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE
.0
04/01/08
08/30/08
0
0
0
300 06 0308 / 5414
ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,171
100
300 05 0047 / 5162
ON W CORNELIA AVE FROM N RAVENSWOOD AVE TO N WOLCOTT AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 / 32277
ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE
.0
04/01/08
08/30/08
0
300 06 / 32275
ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE
.0
03/01/07
10/31/07
3,900 02/14/07
300 06 / 32275
ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST
.0
03/01/07
10/31/07
300 06 0308 / 5414
ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE
.0
02/01/06
07/31/06
300 05 0047 / 5162
ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE
.0
07/17/06
300 06 0292 / 5399
W FULLERTON AVE AND N LAKEWOOD AVE
1.0
300 06 0292 / 5399
2800 N ASHLAND AVE
281 00 / 33670
2401-2409 N CLYBOURN AVE
300 06 0292 / 5399
2942 N LINCOLN AVE
1.0
300 06 0292 / 5399
1100 N NORTH BRANCH ST
1.0
Totals per Design/Engineering
Work Type: Feasibility Study 302 00 0079 / 5767
ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE
Totals per Lighting/Electrical
0
0
03/14/07
3,194
100
3,900 02/14/07
03/14/07
3,194
100
0 02/01/06
07/31/06
1,086
100
07/30/06
0 07/17/06
07/30/06
0
0
02/01/05
03/01/05
5,000 03/01/05
04/01/05
2,745
100
1.0
03/31/05
04/20/05
2,000 03/30/05
04/27/05
2,000
100
.0
01/01/08
12/31/08
01/06/05
03/11/05
4.0
0
0
0
1,000 07/12/05
07/20/05
0
100
10,000 12/10/04
04/14/05
4,397
100
25,800
18,787
Projects .0
10/25/01
10/25/01
0 10/25/01 25,800
10/25/01
0 18,787
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 332
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0032 / 5455
ON N AVONDALE AVE FROM N SEELEY AVE TO N WINCHESTER AVE
3.0
04/18/06
11/18/06
1,200 09/22/06
10/10/06
606
100
300 07 0032 / 5455
ON N CLIFTON AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE
1.0
04/18/06
11/18/06
400 09/22/06
10/10/06
202
100
300 06 0122 / 5275
ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST
6.0
11/01/03
11/07/03
2,250 10/30/03
10/30/03
1,461
100
300 07 0032 / 5455
ON N HAMILTON AVE FROM W WEBSTER AVE TO N AVONDALE AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON N HOYNE AVE FROM W CHICAGO AVE TO W HADDON AVE
10.0
04/18/06
11/18/06
4,000 09/22/06
10/10/06
2,020
100
300 07 0032 / 5455
ON N HOYNE AVE FROM W WEBSTER AVE TO N AVONDALE AVE
10.0
04/18/06
11/18/06
4,000 09/22/06
10/10/06
2,020
100
300 07 0032 / 5455
ON N KENMORE AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON N LAKEWOOD AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 09 / 33098
ON N LEAVITT ST FROM W HOMER ST TO W CORTLAND ST
4.0
08/26/08
08/27/08
1,600 08/26/08
08/27/08
0
100
300 07 0032 / 5455
ON N LEAVITT ST FROM W SUPERIOR ST TO W DIVISION ST
8.0
04/18/06
11/18/06
3,200 09/22/06
10/10/06
1,616
100
300 07 0032 / 5455
ON N MAGNOLIA AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
1,600 09/22/06
10/10/06
808
100
300 07 0032 / 5455
ON N SEELEY AVE FROM W WEBSTER AVE TO N AVONDALE AVE
2.0
04/18/06
11/18/06
800 09/22/06
10/10/06
404
100
300 07 0032 / 5455
ON N SEMINARY AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
2.50
04/18/06
11/18/06
1,000 09/22/06
10/10/06
505
100
300 07 0032 / 5455
ON N WAYNE AVE FROM N CLYBOURN AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
1,600 09/22/06
10/10/06
404
100
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
.0
03/01/06
12/31/06
300 07 0032 / 5455
ON N WINCHESTER AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
1,600 09/22/06
300 07 0032 / 5455
ON N WOLCOTT AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
300 07 0032 / 5455
ON W BARRY AVE FROM N LINCOLN AVE TO N ASHLAND AVE
2.0
04/18/06
11/18/06
300 07 0032 / 5455
ON W BARRY AVE FROM N RACINE AVE TO N LINCOLN AVE
13.0
04/18/06
300 07 0032 / 5455
ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST
5.0
300 11 / 32221
ON W CATON ST FROM N MILWAUKEE AVE TO N LEAVITT ST
300 06 0122 / 5275
ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE
300 11 / 32221
0
0
0
10/10/06
808
100
1,600 09/22/06
10/10/06
808
100
800 09/22/06
10/10/06
404
100
11/18/06
5,200 09/22/06
10/10/06
2,626
100
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
5.0
08/10/07
09/10/07
2,200 09/10/07
03/07/08
2,200
100
13.44
12/01/03
12/01/03
5,376 11/15/03
11/20/03
5,460
100
ON W CONCORD PL FROM N HOYNE AVE TO N LEAVITT ST
4.0
10/10/07
10/10/07
1,600 10/10/07
10/10/07
1,600
100
300 07 0032 / 5455
ON W CONCORD PL FROM N MILWAUKEE AVE TO N LEAVITT ST
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 11 / 32221
ON W CONCORD PL FROM N THROOP ST TO N ADA ST
4.0
08/10/07
09/10/07
1,600 09/10/07
09/07/08
1,600
100
300 07 0032 / 5455
ON W CORTEZ ST FROM N DAMEN AVE TO N WESTERN AVE
7.50
04/18/06
11/18/06
3,000 09/22/06
10/10/06
1,515
100
300 07 0032 / 5455
ON W CORTLAND ST FROM N DAMEN AVE TO N HERMITAGE AVE
15.0
04/18/06
11/18/06
6,000 09/22/06
10/10/06
3,030
100
300 07 0032 / 5455
ON W FLETCHER ST FROM N RACINE AVE TO N GREENVIEW AVE
12.0
04/18/06
11/18/06
4,800 09/22/06
10/10/06
2,424
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 333
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0032 / 5455
ON W GEORGE ST FROM N LINCOLN AVE TO N ASHLAND AVE
12.0
04/18/06
11/18/06
4,800 09/22/06
10/10/06
2,424
100
300 07 0032 / 5455
ON W GEORGE ST FROM N RACINE AVE TO N LINCOLN AVE
7.0
04/18/06
11/18/06
2,800 09/22/06
10/10/06
1,414
100
300 07 0032 / 5455
ON W HADDON AVE FROM N DAMEN AVE TO N LEAVITT ST
8.0
04/18/06
11/18/06
3,200 09/22/06
10/10/06
1,616
100
300 07 0032 / 5455
ON W HADDON AVE FROM N OAKLEY BLVD TO N LEAVITT ST
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON W IOWA ST FROM N DAMEN AVE TO N HONORE ST
3.50
04/18/06
11/18/06
1,400 09/22/06
10/10/06
707
100
300 07 0032 / 5455
ON W IOWA ST FROM N DAMEN AVE TO N WESTERN AVE
20.0
04/18/06
11/18/06
8,000 09/22/06
10/10/06
4,040
100
300 07 0032 / 5455
ON W LE MOYNE ST FROM N HOYNE AVE TO N LEAVITT ST
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
2.50
04/18/06
11/18/06
1,000 09/22/06
10/10/06
0
100
300 07 0032 / 5455
ON W LYNDALE ST FROM N AVONDALE AVE TO N LEAVITT ST
2.0
04/18/06
11/18/06
800 09/22/06
10/10/06
404
100
300 09 / 33098
ON W MOFFAT ST FROM N HOYNE AVE TO N LEAVITT ST
5.0
08/26/08
08/27/08
2,000 08/26/08
08/27/08
0
100
300 07 0032 / 5455
ON W NELSON ST FROM N GREENVIEW AVE TO N ASHLAND AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON W NELSON ST FROM N RACINE AVE TO N SOUTHPORT AVE
8.0
04/18/06
11/18/06
3,200 09/22/06
10/10/06
1,616
100
300 07 0032 / 5455
ON W OAKDALE AVE FROM N RACINE AVE TO N LAKEWOOD AVE
4.0
04/18/06
11/18/06
1,600 09/22/06
10/10/06
808
100
300 07 0032 / 5455
ON W OAKDALE AVE FROM N SOUTHPORT AVE TO N ASHLAND AVE
4.0
04/18/06
11/18/06
1,600 09/22/06
10/10/06
808
100
300 07 0032 / 5455
ON W POTOMAC AVE FROM N HOYNE AVE TO N LEAVITT ST
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON W RICE ST FROM N DAMEN AVE TO N WESTERN AVE
15.0
04/18/06
11/18/06
6,000 09/22/06
10/10/06
3,030
100
300 11 / 32221
ON W SCHOOL ST FROM N PAULINA ST TO N RAVENSWOOD AVE
5.0
08/10/07
09/10/07
2,200 09/10/07
03/07/08
2,200
100
300 07 0032 / 5455
ON W THOMAS ST FROM N DAMEN AVE TO N OAKLEY BLVD
12.0
04/18/06
11/18/06
4,800 09/22/06
10/10/06
2,424
100
300 07 0032 / 5455
ON W WALTON ST FROM N DAMEN AVE TO N WESTERN AVE
16.0
04/18/06
11/18/06
6,400 09/22/06
10/10/06
3,232
100
300 07 0032 / 5455
ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
300 07 0032 / 5455
ON W WELLINGTON AVE FROM N RACINE AVE TO N ASHLAND AVE
16.0
04/18/06
11/18/06
6,400 09/22/06
10/10/06
3,232
100
300 07 0032 / 5455
ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
5.0
04/18/06
11/18/06
2,000
302 00 0092 / 5774
3212 N PAULINA ST
1.0
0 09/21/01
302 00 0092 / 5774
3224 N PAULINA ST
1.0
302 00 0092 / 5774
3240 N PAULINA ST
1.0
300 06 0069 / 5233
1900 N WILMOT AVE
302 00 0092 / 5774 300 06 0069 / 5233
0
0
09/21/01
206
100
0 09/21/01
09/21/01
206
100
0 09/21/01
09/21/01
206
100
4.0
1,500 01/10/03
01/10/03
1,500
100
2109 W DICKENS AVE
1.0
0 01/16/02
01/16/02
203
100
1756 W NEWPORT AVE
1.0
210 01/10/03
01/10/03
203
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
357.44
01/13/03
01/13/03
141,336
76,130
1,764,767
1,912,147
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 334
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 07 0032 / 5455
ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST
9.0
04/18/06
11/18/06
3,600 09/07/06
10/10/06
1,818
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD
9.0
04/18/06
11/18/06
3,600 09/07/06
10/10/06
1,818
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE
9.0
04/18/06
11/18/06
3,600 09/07/06
10/10/06
1,818
100
300 09 / 33109
ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
1.0
02/01/08
12/31/08
400 08/07/08
08/11/08
339
100
300 09 / 33109
ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE
1.0
06/23/08
06/27/08
400 04/01/08
12/01/08
0
0
300 07 0032 / 5455
ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
2,000 09/07/06
10/10/06
2,020
100
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
1,600 09/07/06
10/10/06
808
100
300 06 0122 / 5275
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
27.50
11/01/03
11/21/03
11,200 10/05/03
10/06/03
7,718
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST
8.0
04/18/06
11/18/06
3,200 09/07/06
10/10/06
1,616
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
1,600 09/07/06
10/10/06
808
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST
4.50
04/18/06
11/18/06
1,800 09/07/06
10/10/06
909
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE
24.0
04/18/06
11/18/06
9,600 09/07/06
10/10/06
4,848
100
300 07 0032 / 5455
ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE
9.0
04/18/06
11/18/06
3,600 09/07/06
10/10/06
1,818
100
300 03 0043 / 4914
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
9.50
07/10/04
07/13/04
3,800 07/05/04
07/12/04
2,430
100
300 03 0044 / 4915
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
41.0
07/10/04
07/13/04
16,400 07/12/04
08/10/04
10,486
100
300 06 0069 / 5233
ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE
32.0
10/04/02
10/04/02
16,800 10/01/02
10/01/02
12,000
100
300 03 0032 / 4903
ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE
20.0
08/16/04
08/19/04
8,000 07/01/04
07/14/04
9,661
100
300 07 0032 / 5455
ON W WEBSTER AVE FROM N SOUTHPORT AVE TO N CLYBOURN AVE
5.0
04/18/06
11/18/06
2,000 09/22/06
10/10/06
1,010
100
Totals per 400 Watt Changeout
231.50
96,800
63,742
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 335
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1583 / 7769
2126 N CLIFTON AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
300 06 0139 / 5289
2148 N DAMEN AVE
1,483.0
03/01/04
12/01/04
0 06/01/06
06/10/06
44,807
100
302 00 0092 / 5774
2150 N DAMEN AVE
15.0
0 03/07/01
01/17/02
3,535
100
805 06 1537 / 7723
1921 N ELSTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1438 / 7624
1939 N ELSTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1207 / 7393
1728 N HONORE ST
1.0
08/09/95
08/09/95
0 08/09/95
08/09/95
300
100
805 06 1208 / 7394
2036 N HONORE ST
1.0
04/17/95
04/17/95
0 04/17/95
04/17/95
300
100
805 06 1147 / 7333
2715 N KENMORE AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 1828 / 8014
1860 N MAUD AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
805 06 1829 / 8015
1921 N MAUD AVE
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1830 / 8016
1924 N MAUD AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
805 06 1790 / 7976
1944 N MAUD AVE
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1793 / 7979
1944 N MAUD AVE
1.0
01/31/97
01/31/97
0 01/31/97
01/31/97
300
100
805 06 1802 / 7988
1944 N MAUD AVE
1.0
01/13/97
01/13/97
0 01/13/97
01/13/97
300
100
805 06 1482 / 7668
1618 N PAULINA ST
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 1490 / 7676
1874 N SHEFFIELD AVE
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
805 06 0653 / 6839
2218 N SOUTHPORT AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0654 / 6840
2258 N SOUTHPORT AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0481 / 6667
2218 N WAYNE AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 0510 / 6696
2218 N WAYNE AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 0482 / 6668
2237 N WAYNE AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 0483 / 6669
2252 N WAYNE AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0484 / 6670
2257 N WAYNE AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 0534 / 6720
959 N WESTERN AVE
1.0
10/26/95
10/26/95
0 10/26/95
10/26/95
300
100
805 06 0516 / 6702
1001 N WESTERN AVE
1.0
04/15/96
04/15/96
0 04/15/96
04/15/96
300
100
805 06 0440 / 6626
1920 N WINCHESTER AVE
1.0
05/18/95
05/18/95
0 05/18/95
05/18/95
300
100
805 06 0722 / 6908
2316 W AUGUSTA BLVD
1.0
04/10/96
04/10/96
0 04/10/96
04/10/96
300
100
805 06 0723 / 6909
2334 W AUGUSTA BLVD
1.0
09/18/95
09/18/95
0 09/18/95
09/18/95
300
100
805 06 0454 / 6640
1804 W BLOOMINGDALE AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0455 / 6641
1812 W BLOOMINGDALE AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0838 / 7024
2110 W CATON ST
1.0
03/08/96
03/08/96
0 03/08/96
03/08/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 336
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0839 / 7025
2120 W CATON ST
1.0
03/08/96
03/08/96
0 03/08/96
03/08/96
300
100
805 06 0799 / 6985
2138 W CATON ST
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 1976 / 8162
2221 W CHARLESTON ST
1.0
12/12/96
12/12/96
0 12/12/96
12/12/96
300
100
805 06 1602 / 7788
2213 W CORTLAND ST
1.0
01/11/96
01/11/96
0 01/11/96
01/11/96
300
100
805 06 1884 / 8070
2213 W CORTLAND ST
1.0
11/01/95
11/01/95
0 11/01/95
11/01/95
300
100
805 06 0815 / 7001
1155 W FULLERTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0796 / 6982
1357 W FULLERTON AVE
1.0
11/15/96
11/15/96
0 11/15/96
11/15/96
300
100
805 06 1535 / 7721
2338 W MC LEAN AVE
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 1818 / 8004
2023 W MELROSE ST
1.0
10/26/95
10/26/95
0 10/26/95
10/26/95
300
100
805 06 0684 / 6870
2316 W RICE ST
1.0
11/17/95
11/17/95
0 11/17/95
11/17/95
300
100
805 06 0495 / 6681
2350 W WALTON ST
1.0
02/15/96
02/15/96
0 02/15/96
02/15/96
300
100
805 06 0485 / 6671
1332 W WEBSTER AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 1489 / 7675
1478 W WEBSTER AVE
1.0
11/13/97
11/13/97
0 11/13/97
11/13/97
300
100
805 06 0536 / 6722
1856 W WELLINGTON AVE
1.0
07/19/96
07/19/96
0 07/19/96
07/19/96
300
100
805 06 0489 / 6675
1150 W WRIGHTWOOD AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
1824 W WEBSTER AVE
Work Type: Arterial Strt Lighting/Lamps 300 07 0001 / 5424
ON N LEAVITT ST FROM N MILWAUKEE AVE TO W WABANSIA AVE
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
300 07 0032 / 5455
1234 W GEORGE ST
Totals per Arterial Strt Lighting/Lamps
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2150 N DAMEN AVE
1,542.0
0
61,542
Lamps 2,361.0
06/01/07
12/31/07
69,507 07/21/07
08/18/07
69,507
100
.50
04/18/06
11/18/06
3,500 11/21/06
11/21/06
0
100
.0
03/01/06
12/31/06
0
0
0
1.0
04/18/06
11/18/06
3,000
0
0
6,500
0
Blocks
1.50
Installations 2,166.0
0 04/24/02
04/27/02
39,439
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 337
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
302 00 0092 / 5774
2944 N SOUTHPORT AVE
1.0
0 08/30/01
08/30/01
404
100
302 00 0092 / 5774
2954 N SOUTHPORT AVE
1.0
0 08/30/01
08/30/01
404
100
302 00 0092 / 5774
2315 W AUGUSTA BLVD
1.0
0 08/22/01
08/22/01
404
100
302 00 0092 / 5774
2323 W AUGUSTA BLVD
1.0
0 08/22/01
08/22/01
404
100
4.0
0
1,616
0
0
0
22,567
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
2401-2409 N CLYBOURN AVE
Work Type: Lighting Imprvmnts
Blocks .0
01/01/08
12/31/08
Installations
300 06 0292 / 5399
2800 N ASHLAND AVE
.0
06/29/05
12/31/05
281 00 / 33670
2401-2409 N CLYBOURN AVE
.0
01/01/08
12/31/08
300 06 0292 / 5399
1100 N NORTH BRANCH ST
1.0
10/19/06
Totals per Lighting Imprvmnts
Work Type: Loop Lighting 281 00 / 33670
2401-2409 N CLYBOURN AVE
29,778 08/15/05 0 64,000 10/19/06
1.0
12/31/05
0
0
86
70
93,778
22,653
0
0
Blocks .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 338
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 07 0032 / 5455
ON N DAMEN AVE FROM W AUGUSTA BLVD TO W HADDON AVE
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W AUGUSTA BLVD TO W CORTEZ ST
9.0
04/18/06
11/18/06
12,150 09/22/06
10/10/06
7,706
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CHICAGO AVE TO W AUGUSTA BLVD
9.0
04/18/06
11/18/06
12,150 09/22/06
10/10/06
7,706
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W CORTEZ ST TO W DIVISION ST
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 07 0032 / 5455
ON N OAKLEY BLVD FROM W SUPERIOR ST TO W CHICAGO AVE
9.0
04/18/06
11/18/06
12,150 09/22/06
10/10/06
7,706
100
300 09 / 33109
ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
1.0
08/25/08
09/12/08
1,350 08/25/08
09/12/08
1,147
100
300 07 0032 / 5455
ON N RACINE AVE FROM W DICKENS AVE TO W WEBSTER AVE
8.0
04/18/06
11/18/06
10,800 09/22/06
10/10/06
6,850
100
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
5,400 09/22/06
10/10/06
3,425
100
300 06 0122 / 5275
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
21.50
11/01/03
11/21/03
25,800 10/14/03
10/20/03
37,364
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W AUGUSTA BLVD TO W CORTEZ ST
8.0
04/18/06
11/18/06
10,800 09/22/06
10/10/06
6,850
100
300 07 0032 / 5455
ON N WESTERN AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
4.0
04/18/06
11/18/06
5,400 09/22/06
10/10/06
3,425
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N DAMEN AVE TO N HONORE ST
4.50
04/18/06
11/18/06
6,075 09/22/06
10/10/06
3,853
100
300 07 0032 / 5455
ON W AUGUSTA BLVD FROM N WESTERN AVE TO N DAMEN AVE
24.0
04/18/06
11/18/06
32,400 09/22/06
10/10/06
20,550
100
300 06 0122 / 5275
ON W CHICAGO AVE FROM N OAKLEY AVE TO N WOLCOTT AVE
13.44
12/01/03
12/06/03
18,144 11/28/03
12/04/03
18,721
100
300 07 0032 / 5455
ON W CORTLAND ST FROM N HERMITAGE AVE TO N ASHLAND AVE
9.0
04/18/06
11/18/06
12,150 09/22/06
10/10/06
7,706
100
300 06 0069 / 5233
ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE
32.0
10/01/02
10/31/02
38,400 10/01/02
10/21/02
46,764
100
300 07 0032 / 5455
ON W WEBSTER AVE FROM N CLYBOURN AVE TO N SOUTHPORT AVE
4.0
04/18/06
11/18/06
5,400 09/22/06
10/10/06
3,425
100
300 03 0032 / 4903
ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE
20.0
08/16/04
08/19/04
27,000 09/01/04
10/01/04
0
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 281 00 / 33670
2401-2409 N CLYBOURN AVE
Work Type: POD Camera Pole 281 00 / 33670
2401-2409 N CLYBOURN AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
2657 N CLYBOURN AVE
189.44
247,719
190,903
Blocks .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Poles .0
Lamps .0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 339
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting 300 06 / 32277
ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE
300 06 0308 / 5414
ON W BARRY AVE FROM N HOYNE AVE TO N DAMEN AVE
300 06 / 32277
ON W FLETCHER ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE
300 06 / 32275
ON W MELROSE ST FROM N LINCOLN AVE TO N RAVENSWOOD AVE
300 06 / 32275
ON W SCHOOL ST FROM N LINCOLN AVE TO N PAULINA ST
300 06 0308 / 5414
ON W WELLINGTON AVE FROM N HOYNE AVE TO N DAMEN AVE
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
Blocks .0
05/04/08
12/31/08
1.0
03/01/06
05/01/06
.0
05/04/08
12/31/08
1.0
04/01/07
12/31/07
1.0
04/01/07
.50
03/09/06
0
0
0
04/28/06
63,684
100
0
0
108,392 03/27/07
06/29/07
69,752
100
12/31/07
108,392 03/27/07
06/29/07
69,752
100
05/09/06
49,164 03/09/06
04/28/06
31,842
100
3.50
98,328 03/09/06 0
364,276
235,030
Blocks
300 03 0032 / 4903
ON N HOYNE AVE FROM W WABANSIA AVE TO W CHURCHILL ST
2.0
09/15/04
11/30/04
60,000 09/20/04
01/21/05
0
100
300 06 0235 / 5349
ON W LYNDALE ST FROM N LEAVITT ST TO N WESTERN AVE
2.0
06/01/03
08/01/03
145,471 05/28/03
07/30/03
133,463
100
300 03 0032 / 4903
ON W WABANSIA AVE FROM N ASHLAND AVE TO N WOOD ST
1.50
10/01/04
12/15/04
92,500 10/08/04
01/21/05
42,715
100
300 06 0267 / 5375
ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE
2.0
08/15/04
10/15/04
150,000 09/20/04
01/21/05
162,403
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 03 0032 / 4903
ON W WABANSIA AVE FROM N WOOD ST TO N MILWAUKEE AVE
Work Type: Short Arm Installs - Arterial 281 00 / 33670
2401-2409 N CLYBOURN AVE
7.50
447,971
338,581
Locations 1.0
09/15/04
11/30/04
01/01/08
12/31/08
50,944 09/20/04
01/21/05
50,000
100
0
0
Locations .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 340
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
281 00 / 33670
2401-2409 N CLYBOURN AVE
0
0
302 00 0092 / 5774
3204 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3230 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3252 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3310 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3336 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3350 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3410 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3430 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3448 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
3456 N RAVENSWOOD AVE
1.0
0 05/18/01
05/18/01
378
100
302 00 0092 / 5774
2942 N SOUTHPORT AVE
1.0
0 08/30/01
08/30/01
335
100
302 00 0092 / 5774
2952 N SOUTHPORT AVE
1.0
0 08/30/01
08/30/01
335
100
.0
300 09 / 33109
ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
300 09 / 33109
ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE
300 06 0108 / 5263
12/31/08
12.0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
01/01/08
0
0
4,450
Locations 1.0
06/16/08
06/20/08
300 06/16/08
06/20/08
200
100
2.25
05/19/08
06/20/08
450 04/01/08
12/01/08
450
100
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
21.50
10/01/03
10/22/03
9,520 09/20/03
09/26/03
9,520
100
300 07 0001 / 5424
ON N WILMOT AVE FROM W CORTLAND ST TO W ARMITAGE AVE
.0
03/01/06
12/31/06
300 03 0043 / 4914
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
14.50
07/26/04
08/09/04
4,725 07/01/04
300 03 0044 / 4915
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
72.0
07/26/04
08/09/04
302 00 0079 / 5767
ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE
25.40
12/01/01
12/22/01
300 07 0032 / 5455
ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
2.50
04/18/06
11/18/06
300 06 0058 / 5229
ON W ROSCOE ST FROM N WESTERN AVE TO N DAMEN AVE
36.0
300 03 0032 / 4903
ON W WEBSTER AVE FROM N SHEFFIELD AVE TO N SOUTHPORT AVE
52.0
08/11/04
300 05 0043 / 5158
ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE
2.50
300 07 0032 / 5455
ON W WRIGHTWOOD AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
300 06 0108 / 5263
1234 N HALSTED ST
300 07 0032 / 5455
1824 W WEBSTER AVE
Totals per Strt Light Pole Painting
0
0
0
08/10/04
2,961
100
15,950 08/01/04
08/10/04
14,703
100
3,200 04/20/01
05/03/01
3,175
100
500 01/05/07
01/05/07
0
100
9,940 09/09/02
09/27/02
9,940
100
08/19/04
14,150 08/16/04
08/27/04
9,661
100
04/04/05
11/18/05
500 06/27/05
07/23/05
401
100
5.0
04/18/06
11/18/06
1,000 01/05/07
01/05/07
0
100
5.0
10/01/03
10/01/03
1,250 10/05/03
10/06/03
1,050
100
502.0
04/18/06
11/18/06
107,050 03/01/06
12/31/06
75,250
100
741.65
168,535
127,311
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 341
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
Blocks
2401-2409 N CLYBOURN AVE
.0
Work Type: Traffic Signal Regrouping
Lamps
300 06 0139 / 5289
2148 N DAMEN AVE
3,989.0
01/01/08
12/31/08
03/01/04
12/01/04
0
20,743 10/25/06
10/31/06
0
0
43,440
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 342
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2285 / 8471
1830 N ASHLAND AVE
2.0
06/04/96
06/04/96
0 06/04/96
06/04/96
1,500
100
805 06 2311 / 8497
1895 N ASHLAND AVE
7.0
07/01/96
07/01/96
0 07/01/96
07/01/96
5,250
100
805 06 2309 / 8495
1900 N ASHLAND AVE
27.0
07/10/96
07/10/96
0 07/10/96
07/10/96
20,250
100
805 06 2310 / 8496
1900 N ASHLAND AVE
43.0
07/10/96
07/10/96
0 07/10/96
07/10/96
32,250
100
302 00 0070 / 5758
2520 N CLYBOURN AVE
0 04/02/97
04/09/97
15,267
100
805 06 2192 / 8378
2538 N CLYBOURN AVE
12.0
12/31/95
12/31/95
0 12/31/95
12/31/95
9,000
100
805 06 2193 / 8379
2538 N CLYBOURN AVE
18.0
04/09/97
04/09/97
0 04/09/97
04/09/97
13,500
100
805 06 2443 / 8629
1794 N DAMEN AVE
13.0
06/16/93
06/16/93
0 06/16/93
06/16/93
9,750
100
300 06 0217 / 5337
2148 N DAMEN AVE
1,008.0
04/12/04
04/26/04
56,658 04/19/04
05/10/04
76,818
100
805 06 2282 / 8468
2230 N DAMEN AVE
44.0
07/30/96
07/30/96
0 07/30/96
07/30/96
33,000
100
805 06 2440 / 8626
2270 N DAMEN AVE
8.0
09/26/95
09/26/95
0 09/26/95
09/26/95
6,000
100
805 06 2169 / 8355
2000 N ELSTON AVE
7.0
12/31/95
12/31/95
0 12/31/95
12/31/95
5,250
100
302 00 0070 / 5758
2050 N ELSTON AVE
0 12/20/97
12/31/97
18,723
100
805 06 2141 / 8327
2050 N ELSTON AVE
805 06 2543 / 8729
18.0
12/31/97
12/31/97
0 12/31/97
12/31/97
13,500
100
1701 N HERMITAGE AVE
7.0
08/31/92
08/31/92
0 08/31/92
08/31/92
5,250
100
805 06 2732 / 8918
1805 N HONORE ST
6.0
05/27/94
05/27/94
0 05/27/94
05/27/94
4,500
100
805 06 2884 / 9070
1060 N HOOKER ST
6.0
12/03/93
12/03/93
0 12/03/93
12/03/93
4,500
100
805 06 2712 / 8898
1701 N LEAVITT ST
6.0
01/01/95
01/01/95
0 01/01/95
01/01/95
4,500
100
805 06 2668 / 8854
1805 N MARSHFIELD AVE
6.0
11/25/94
11/25/94
0 11/25/94
11/25/94
4,500
100
805 06 2545 / 8731
1798 N PAULINA ST
6.0
09/01/92
09/01/92
0 09/01/92
09/01/92
4,500
100
805 06 2669 / 8855
1805 N WINCHESTER AVE
6.0
12/14/94
12/14/94
0 12/14/94
12/14/94
4,500
100
805 06 2670 / 8856
1805 N WOLCOTT AVE
10.0
10/17/94
10/17/94
0 10/17/94
10/17/94
7,500
100
805 06 2521 / 8707
1805 N WOOD ST
10.0
01/27/95
01/27/95
0 01/27/95
01/27/95
7,500
100
805 06 2291 / 8477
2925 S ASHLAND AVE
14.0
01/01/91
01/01/91
0 01/01/91
01/01/91
10,500
100
805 06 2474 / 8660
1605 W ARMITAGE AVE
12.0
12/14/95
12/14/95
0 12/14/95
12/14/95
9,000
100
805 06 2420 / 8606
1670 W ARMITAGE AVE
8.0
12/11/95
12/11/95
0 12/11/95
12/11/95
6,000
100
805 06 2755 / 8941
1805 W BARRY AVE
4.0
06/21/94
06/21/94
0 06/21/94
06/21/94
3,000
100
805 06 2219 / 8405
1800 W BELMONT AVE
6.0
05/04/94
05/04/94
0 05/04/94
05/04/94
4,500
100
805 06 2879 / 9065
1779 W CORNELIA AVE
6.0
12/21/93
12/21/93
0 12/21/93
12/21/93
4,500
100
805 06 2201 / 8387
1599 W CORTLAND ST
4.0
07/10/96
07/10/96
0 07/10/96
07/10/96
3,000
100
805 06 2227 / 8413
1599 W CORTLAND ST
4.0
07/10/96
07/10/96
0 07/10/96
07/10/96
3,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 343
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 805 06 2642 / 8828
1800 W DIVERSEY PKWY
805 06 2666 / 8852
1326 W DIVISION ST
805 06 2647 / 8833
Fixtures 6.0
05/05/94
05/05/94
0 05/05/94
05/05/94
4,500
100
24.0
06/22/93
06/22/93
0 06/22/93
06/22/93
18,000
100
1635 W FULLERTON AVE
8.0
06/02/93
06/02/93
0 06/02/93
06/02/93
6,000
100
805 06 2195 / 8381
2036 W FULLERTON AVE
12.0
06/19/97
06/19/97
0 06/19/97
06/19/97
9,000
100
805 06 2196 / 8382
2036 W FULLERTON AVE
8.0
06/04/93
06/04/93
0 06/04/93
06/04/93
6,000
100
805 06 2144 / 8330
2295 W FULLERTON AVE
32.0
12/31/95
12/31/95
0 12/31/95
12/31/95
24,000
100
805 06 2923 / 9109
1799 W MELROSE ST
6.0
10/13/93
10/13/93
0 10/13/93
10/13/93
4,500
100
302 00 0072 / 5760
1430 W NORTH AVE
1.0
0 10/12/99
10/22/99
19,862
100
302 00 0072 / 5760
1450 W NORTH AVE
1.0
0 10/05/99
10/08/99
12,433
100
805 06 2925 / 9111
1763 W ROSCOE ST
6.0
12/01/93
12/01/93
0 12/01/93
12/01/93
4,500
100
805 06 2924 / 9110
1779 W SCHOOL ST
6.0
10/15/93
10/15/93
0 10/15/93
10/15/93
4,500
100
805 06 2650 / 8836
1601 W WEBSTER AVE
14.0
05/20/92
05/20/92
0 05/20/92
05/20/92
10,500
100
302 00 0070 / 5758
1650 W WEBSTER AVE
0 12/15/97
12/26/97
9,809
100
805 06 2127 / 8313
1650 W WEBSTER AVE
0 12/26/97
12/26/97
12,750
100
302 00 0070 / 5758
1900 W WEBSTER AVE
0 12/10/97
12/20/97
9,488
100
805 06 2100 / 8286
1900 W WEBSTER AVE
9.0
0 12/20/97
12/20/97
6,750
100
302 00 0072 / 5760
1930 W WEBSTER AVE
1.0
0 10/20/99
11/10/99
30,903
100
805 06 2439 / 8625
1999 W WEBSTER AVE
8.0
05/01/92
05/01/92
0 05/01/92
05/01/92
6,000
100
805 06 2619 / 8805
1999 W WEBSTER AVE
40.0
01/23/95
01/23/95
0 01/23/95
01/23/95
30,000
100
805 06 2641 / 8827
1805 W WELLINGTON AVE
6.0
12/14/94
12/14/94
0 12/14/94
12/14/94
4,500
100
805 06 2645 / 8831
1898 W WRIGHTWOOD AVE
4.0
12/14/94
12/14/94
0 12/14/94
12/14/94
3,000
100
Totals per Underpass Lighting
17.0
1,537.0
12/26/97
12/20/97
12/26/97
12/20/97
56,658
587,803
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 344
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N ELSTON AVE AND N LEAVITT ST
.50
0 10/24/02
10/24/02
5,037
100
210 06 0130 / 4389
N ELSTON AVE AND W NORTH AVE
1.0
0 10/16/02
10/16/02
1,850
100
210 06 0130 / 4389
N SHEFFIELD AVE AND W NORTH AVE
1.0
0 10/16/02
10/16/02
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W ARMITAGE AVE
.50
04/01/05
04/02/05
5,282 04/07/05
04/07/05
4,523
100
210 06 0219 / 4459
N WESTERN AVE AND W CHICAGO AVE
.50
04/15/05
04/15/05
5,282 04/10/05
04/10/05
4,004
100
210 06 0219 / 4459
N WESTERN AVE AND W FULLERTON AVE
.50
04/04/05
04/05/05
5,282 03/25/05
03/25/05
4,523
100
300 06 0225 / 5340
1800-1775 N LEAVITT ST
4.0
09/02/02
10/31/02
9,850 07/25/02
08/09/02
7,739
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0231 / 4470
W DIVISION ST AND N HALSTED ST
300 06 0078 / 5241
2400 N ASHLAND AVE
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0171 / 4420
N LINCOLN AVE AND W SCHOOL ST
Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276
W ADDISON ST AND N PAULINA ST
210 06 / 32276
W DIVERSEY PKWY AND N SHEFFIELD AVE
Totals per Pedestrian Countdown Signal Installation
Work Type: Removal Temp Wiring - Signals
8.0
25,695
29,526
Locations .0
03/01/08
12/01/08
1.0
04/01/98
12/01/98
1.0
0 5,615 03/20/98
04/20/00
5,615
0
0
4,794
100
4,794
Locations 08/02/07
09/20/07
57,120 04/19/07
4.0
11/21/07
11/26/07
5,760 12/10/07
.0
04/01/07
02/28/08
5,760 11,520
3,425
.50
91,967
85
3,425
100
0
0
Installations
4.0
12/14/07
Crossings
300 06 0197 / 5322
N OAKLEY AVE AND W AUGUSTA BLVD
1.0
4,000 07/17/01
07/18/01
6,359
100
300 06 0197 / 5322
N OAKLEY AVE AND W DIVISION ST
.50
2,000 07/11/01
07/12/01
131
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
2148 N DAMEN AVE
1.50
6,000
6,490
Intersections 71.0
11/19/03
11/23/03
0 12/08/06 541,505
12/15/06
11,227 2,224,762
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 345
1/1/2008 AND 12/31/2008
Ward 32 Scott Waguespack CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0022 / 4297
W GEORGE ST AND N LINCOLN AVE
1.0
12/03/01
03/31/02
216,500 11/19/01
03/01/02
160,969
100
814 06 0288 / 16500
2000 N ASHLAND AVE
1.0
01/03/92
01/03/92
0 01/03/92
01/03/92
126,620
100
814 06 0289 / 16501
2037 N ASHLAND AVE
1.0
01/03/92
01/03/92
0 01/03/92
01/03/92
126,620
100
814 06 0244 / 16456
2340 N CLYBOURN AVE
1.0
01/01/95
01/01/95
0 01/01/95
01/01/95
125,000
100
210 06 0027 / 4301
2700 N CLYBOURN AVE
06/01/02
01/15/03
192,605 04/24/02
12/13/02
190,881
100
814 06 0106 / 16321
2269 N DAMEN AVE
1.0
09/24/94
09/24/94
0 09/24/94
09/24/94
33,115
100
814 06 0291 / 16503
2000 N ELSTON AVE
1.0
01/02/92
01/02/92
0 01/02/92
01/02/92
126,620
100
814 06 0290 / 16502
2200 N ELSTON AVE
1.0
11/14/91
11/14/91
0 11/14/91
11/14/91
126,620
100
814 06 0067 / 16283
1200 N NORTH BRANCH ST
1.0
03/22/94
03/22/94
0 03/22/94
03/22/94
132,866
100
814 06 0162 / 16374
1952 N SOUTHPORT AVE
1.0
07/07/97
07/07/97
0 07/07/97
07/18/97
200,000
100
814 06 0265 / 16477
2132 N SOUTHPORT AVE
1.0
03/09/92
03/09/92
0 03/09/92
03/09/92
108,062
100
814 06 0377 / 16567
1599 N THROOP ST
1.0
04/30/96
04/30/96
0 04/30/96
04/30/96
142,921
100
814 06 0275 / 16487
2399 N WOOD ST
1.0
01/26/89
01/26/89
0 01/26/89
01/26/89
123,765
100
814 06 0105 / 16320
1670 W ARMITAGE AVE
1.0
10/20/94
10/20/94
0 10/20/94
10/20/94
59,079
100
814 06 0118 / 16333
1732 W ARMITAGE AVE
1.0
09/28/93
09/28/93
0 09/28/93
09/28/93
110,321
100
210 06 0018 / 4293
1835 W FULLERTON AVE
1.0
02/01/98
04/01/98
20,000 01/21/98
06/18/98
27,729
100
814 06 0298 / 16510
2130 W FULLERTON AVE
1.0
01/01/97
01/01/97
0 01/01/97
92,412
100
814 06 0107 / 16322
1438 W NORTH AVE
1.0
10/27/94
10/27/94
0 10/27/94
57,284
100
17.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 07 0032 / 5455
1824 W WEBSTER AVE
10/27/94
429,105
2,070,884
Locations 24.0
04/18/06
11/18/06
6,450 03/01/06
12/31/06
6,450
Totals per Construction Phase
2,306,272
4,136,909
Totals for Ward 32
2,332,072
4,155,695
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 346
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32146
ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE
1.0
05/01/07
10/31/07
3,900 05/29/07
06/28/07
2,344
100
300 06 / 32146
ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE
1.0
05/01/07
10/31/07
3,900 05/29/07
06/28/07
2,349
100
300 06 / 32146
ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE
.0
05/01/07
10/31/07
3,900 05/29/07
06/27/07
2,349
100
300 06 0308 / 5414
ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,215
100
300 06 0308 / 5414
ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,215
100
300 06 / 32146
ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE
.0
05/01/07
10/31/07
0
0
100
300 06 / 32277
ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE
.0
04/01/08
08/30/08
0
0
0
210 06 / 32040
N CALIFORNIA AVE AND W IRVING PARK RD
.0
11/01/06
12/31/07
5,000
0
0
210 06 0158 / 5058
W LAWRENCE AVE AND N KIMBALL AVE
.0
08/15/05
12/31/05
235
100
Totals per Design/Engineering
2.0
0 08/15/05 16,700
12/31/05
9,707
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 347
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0122 / 5275
ON N KEDZIE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE
174.0
08/01/03
09/01/03
68,437 07/01/03
07/28/03
39,219
100
300 06 0122 / 5275
ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
14.50
08/01/03
09/01/03
5,688 07/01/03
07/28/03
3,119
100
300 06 0122 / 5275
ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE
87.50
08/01/03
09/01/03
34,219 07/01/03
07/28/03
19,610
100
300 09 / 33101
ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE
1.58
09/02/08
09/03/08
632 09/02/08
09/03/08
378
100
300 06 0122 / 5275
ON W IRVING PARK RD FROM N KEDZIE AVE TO N CHRISTIANA AVE
57.0
11/10/03
11/30/03
24,000 10/30/03
11/28/03
13,496
100
300 06 0122 / 5275
ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE
323.0
11/10/03
11/30/03
127,500 10/30/03
11/28/03
77,597
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
657.58
260,476
153,418
0
Fixtures
300 03 0033 / 4904
ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE
83.70
03/10/05
03/20/05
33,480
300 03 0033 / 4904
ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE
150.0
03/01/05
03/01/05
60,000
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
5.50
08/20/04
09/20/04
2,200 07/14/04
08/10/04
1,438
100
300 06 0122 / 5275
ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE
5.10
07/01/04
07/16/04
2,040 06/22/04
06/30/04
2,040
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
244.30
0
97,720
3,478
2,668,971
1,311,427
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 348
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0768 / 6954
4903 N ALBANY AVE
1.0
05/26/95
05/26/95
0 05/26/95
05/26/95
300
100
805 06 0736 / 6922
4923 N ALBANY AVE
1.0
05/26/95
05/26/95
0 05/26/95
05/26/95
300
100
805 06 0782 / 6968
4941 N ALBANY AVE
1.0
05/20/96
05/20/96
0 05/20/96
05/20/96
300
100
805 06 0887 / 7073
3940 N FRANCISCO AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0780 / 6966
4232 N FRANCISCO AVE
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 0879 / 7065
4325 N FRANCISCO AVE
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
300 06 0096 / 5258
3649 N KEDZIE AVE
905.0
03/01/03
09/01/03
0 03/01/06
09/01/06
27,344
0
302 00 0092 / 5774
3649 N KEDZIE AVE
15.0
0 03/12/01
12/12/01
3,535
100
805 06 1164 / 7350
3649 N KEDZIE AVE
1.0
03/15/96
03/15/96
0 03/15/96
03/15/96
300
100
805 06 1149 / 7335
4601 N KEDZIE AVE
1.0
03/23/95
03/23/95
0 03/23/95
03/23/95
300
100
805 06 1167 / 7353
4725 N KEDZIE AVE
1.0
06/21/95
06/21/95
0 06/21/95
06/21/95
300
100
805 06 1893 / 8079
3924 N MOZART ST
1.0
10/11/96
10/11/96
0 10/11/96
10/11/96
300
100
805 06 1894 / 8080
3940 N MOZART ST
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0686 / 6872
3822 N RICHMOND ST
1.0
10/11/96
10/11/96
0 10/11/96
10/11/96
300
100
805 06 0671 / 6857
3841 N RICHMOND ST
1.0
10/04/96
10/04/96
0 10/04/96
10/04/96
300
100
805 06 0700 / 6886
3630 N SACRAMENTO AVE
1.0
01/25/95
01/25/95
0 01/25/95
01/25/95
300
100
805 06 0702 / 6888
4220 N SACRAMENTO AVE
1.0
05/25/95
05/25/95
0 05/25/95
05/25/95
300
100
805 06 0703 / 6889
4242 N SACRAMENTO AVE
1.0
05/25/95
05/25/95
0 05/25/95
05/25/95
300
100
805 06 0656 / 6842
3700 N SPAULDING AVE
1.0
09/06/95
09/06/95
0 09/06/95
09/06/95
300
100
805 06 0364 / 6550
4937 N TROY ST
1.0
05/26/95
05/26/95
0 05/26/95
05/26/95
300
100
302 00 0092 / 5774
3406 W IRVING PARK RD
1.0
0 04/06/01
04/06/01
236
100
805 06 1895 / 8081
2855 W NELSON ST
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 1928 / 8114
2941 W NELSON ST
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
3649 N KEDZIE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
3649 N KEDZIE AVE
941.0
0
37,115
Lamps 738.0
06/01/07
12/31/07
21,726 07/31/07
08/18/07
21,726
100
0 05/18/02
05/21/02
11,708
100
Installations 643.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 349
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 11 / 32222
ON N ST LOUIS AVE FROM W WILSON AVE TO W LELAND AVE
300 06 0072 / 5235
3843 N CALIFORNIA AVE
302 00 0092 / 5774
3041 N FRANCISCO AVE
300 06 0167 / 5306
3731 N MOZART ST
300 06 0071 / 5234
2800 W IRVING PARK RD
302 00 0092 / 5774
2677 W MONTROSE AVE
300 06 0071 / 5234
2741 W MONTROSE AVE
302 00 0092 / 5774
2850 W NELSON ST
1.0
300 06 0069 / 5233
3253 W WILSON AVE
2.0
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting
11/01/07
11/10/07
2,200 10/11/07
10/11/07
2,200
08/03/01
09/28/01
0 07/02/01
07/03/01
2,379
6.0
0 09/27/01
09/27/01
2,421
100
1.0
0 12/07/99
12/07/99
351
100
0 10/19/00
10/19/00
1,350
100
0 08/21/01
08/21/01
404
100
0 10/19/00
10/19/00
3,600
100
0 10/10/01
10/10/01
345
100
970 11/18/02
11/18/02
1,183
100
4.0
1.0 01/01/00
11/20/02
12/30/00
11/20/02
15.0
3,170
100
14,233
Fixtures
300 11 / 32222
ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST
11.55
11/01/07
12/01/07
15,725 03/13/08
04/04/08
13,060
100
300 11 / 32222
ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST
13.86
11/01/07
12/01/07
18,843 03/13/08
04/04/08
17,538
100
300 11 / 32222
ON W MONTROSE AVE FROM N KEDZIE AVE TO N MANOR AVE
70.0
11/01/07
12/01/07
95,100 03/26/08
04/04/08
58,855
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
3649 N KEDZIE AVE
95.41
129,668
89,452
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 350
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Staggered Lighting 300 11 / 32222
ON N RICHMOND ST FROM W NELSON ST TO W FLETCHER ST
2.0
11/07/07
04/04/08
120,000 11/07/07
78,800
100
300 06 / 32146
ON N SAWYER AVE FROM W LELAND AVE TO W LAWRENCE AVE
2.0
12/05/07
03/28/07
227,000
0
95
300 06 / 32146
ON N SPAULDING AVE FROM W LELAND AVE TO W EASTWOOD AVE
1.0
12/05/07
04/09/08
227,000
0
95
300 06 / 32146
ON N SPAULDING AVE FROM W LELAND AVE TO W LAWRENCE AVE
1.0
12/05/07
05/29/08
227,000
0
95
300 06 0308 / 5414
ON W BARRY AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE
1.0
03/16/06
12/31/06
103,808 09/26/06
12/22/06
69,825
100
300 11 / 32222
ON W FLETCHER ST FROM N FRANCISCO AVE TO N ALBANY AVE
2.0
11/07/07
04/04/08
120,000 11/07/07
04/04/08
78,800
100
300 06 0308 / 5414
ON W FLETCHER ST FROM N FRANCISCO AVE TO N CALIFORNIA AVE
1.0
03/16/06
12/31/06
103,808 09/26/06
12/22/06
69,825
100
300 06 / 32146
ON W LELAND AVE FROM N KEDZIE AVE TO N SPAULDING AVE
2.0
11/05/07
01/29/08
227,000
01/30/08
0
100
300 11 / 32222
ON W NELSON ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE
2.0
11/07/07
04/04/08
120,000 11/07/07
04/04/08
78,800
100
300 06 / 32277
ON W ROSCOE ST FROM N KEDZIE AVE TO N CALIFORNIA AVE
.0
05/04/08
12/31/08
300 11 / 32222
ON W WELLINGTON AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE
1.0
11/08/07
04/04/08
15.0
Totals per Residntl Staggered Lighting
04/04/08
0 55,000 11/08/07
04/04/08
1,530,616
0
0
39,400
100
415,450
Blocks
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON N ALBANY AVE FROM W ARGYLE ST TO W CARMEN AVE
1.0
05/15/03
07/15/03
67,162 05/15/03
07/18/03
66,425
100
300 06 0267 / 5375
ON N ALBANY AVE FROM W ARGYLE ST TO W LAWRENCE AVE
2.0
04/10/04
06/10/04
140,910 04/06/04
05/10/04
131,091
100
300 06 0235 / 5349
ON W ARGYLE ST FROM N WHIPPLE ST TO N ALBANY AVE
1.0
05/15/03
07/15/03
67,162 05/15/03
07/18/03
66,424
100
4.0
Totals per Residntl Strt Lighting/Lamps
Work Type: Strt Light Pole Painting
263,940
Locations
300 03 0033 / 4904
ON N CALIFORNIA AVE FROM W WELLINGTON AVE TO W MONTROSE AVE
300 09 / 33105
ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
300 03 0033 / 4904
ON N KIMBALL AVE FROM W IRVING PARK RD TO W LAWRENCE AVE
302 00 0076 / 5764
ON N SACRAMENTO AVE FROM W WILSON AVE TO W LAWRENCE AVE
300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
4.95
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
300 06 0108 / 5263
ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE
300 04 0216 / 5114
ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE
Totals per Strt Light Pole Painting
275,234
99.51
03/01/05
03/20/05
13.0
09/10/08
09/24/08
162.0
03/01/05
03/20/05
09/01/00
12/31/00
05/15/07
06/01/07
1,089 05/15/07
06/01/07
1,089
100
5.35
05/10/04
09/10/04
1,610 05/10/04
08/01/04
1,445
100
143.65
08/01/04
08/15/04
41,948 06/21/04
07/28/04
31,743
100
12.0
05/01/06
11/01/06
2,596 05/17/06
07/25/06
2,596
100
440.46
26,412 3,900 09/10/08
0 09/24/08
53,000
100
0
0
130,554
2,730
0
39,602
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 351
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0199 / 5324
Blocks
ON W EDDY ST FROM N ALBANY AVE TO N TROY ST
Work Type: Strt Lighting
10/12/01
10/26/01
26,450 08/12/01
08/22/01
30,493
100
Blocks
300 06 0247 / 5357
ON W BERTEAU AVE FROM N FRANCISCO AVE TO N CALIFORNIA AVE
2.0
05/12/03
07/03/03
80,000 05/07/03
07/16/03
77,780
100
300 06 0247 / 5357
ON W WAVELAND AVE FROM N CALIFORNIA AVE TO N FRANCISCO AVE
2.0
05/23/03
07/21/03
80,000 05/20/03
07/16/03
76,132
100
4.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
3649 N KEDZIE AVE
Work Type: Underpass Lighting
160,000
153,912
Lamps 1,486.0
03/01/04
12/01/04
7,727 10/24/06
11/02/06
16,183
100
Fixtures
805 06 2299 / 8485
3201 N KEDZIE AVE
10.0
11/17/92
11/17/92
0 11/17/92
11/17/92
7,500
100
300 06 0217 / 5337
3649 N KEDZIE AVE
456.0
04/27/04
05/03/04
25,631 05/11/04
05/14/04
17,217
100
805 06 2295 / 8481
3725 S ALBANY AVE
26.0
11/19/93
11/19/93
0 11/19/93
11/19/93
19,500
100
805 06 2812 / 8998
3630 S CALIFORNIA AVE
22.0
03/05/93
03/05/93
0 03/05/93
03/05/93
16,500
100
Totals per Underpass Lighting
514.0
25,631
60,717
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 352
1/1/2008 AND 12/31/2008
Ward 33 Richard F. Mell CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Locations
Work Type: LED Signal Head Install 210 06 0130 / 4389
N CENTRAL PARK AVE AND W IRVING PARK RD
1.0
0 04/03/02
04/03/02
8,539
100
210 06 0130 / 4389
N KEDZIE AVE AND W ARGYLE ST
.50
0 08/26/02
08/26/02
925
100
1.50
Totals per LED Signal Head Install
0
9,464
Locations
Work Type: Left Turn Arrow 210 06 / 32040
N CALIFORNIA AVE AND W IRVING PARK RD
1.0
11/01/06
12/31/08
120,822
100
210 06 0231 / 4470
N ELSTON AVE AND W IRVING PARK RD
.0
03/01/08
12/01/08
121,474
0
0
210 06 / 32157
N KEDZIE AVE AND W LAWRENCE AVE
.0
11/01/08
02/28/09
51,000
0
0
210 06 0158 / 5058
Awaiting for a responce from obm Note Last Updated on 04-OCT-07 W LAWRENCE AVE AND N KIMBALL AVE
.50
06/22/06
12/31/07
30,000 06/22/06
22,347
95
85,000 02/08/07
08/24/07
NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07 1.50
Totals per Left Turn Arrow
Work Type: Signals 300 06 0096 / 5258
287,474
143,169
Intersections
3649 N KEDZIE AVE
Work Type: TSM Install
39.0
10/01/03
10/08/03
0 09/30/06
10/07/06
6,167
100
Locations
814 06 0087 / 16303
2890 N CALIFORNIA AVE
1.0
10/04/94
10/04/94
0 10/04/94
10/04/94
62,421
100
814 06 0287 / 16499
3930 N CENTRAL PARK AVE
1.0
11/26/91
11/26/91
0 11/26/91
11/26/91
123,207
100
814 06 0385 / 16573
3200 N SACRAMENTO AVE
1.0
04/18/91
04/18/91
0 04/18/91
04/18/91
96,382
100
814 06 0193 / 16405
4000 N SACRAMENTO AVE
1.0
10/20/95
10/20/95
0 10/20/95
10/20/95
125,000
100
814 06 0199 / 16411
4800 N SACRAMENTO AVE
1.0
08/14/96
08/14/96
0 08/14/96
08/14/96
150,000
100
814 06 0084 / 16300
3176 W BELMONT AVE
1.0
05/19/95
05/19/95
0 05/19/95
05/19/95
161,287
100
6.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
Totals per Traffic
0
718,297
Locations 1.65
05/15/07
06/01/07
512 05/15/07
06/01/07
512
287,986
877,608
Totals per Construction Phase
2,956,957
2,189,035
Totals for Ward 33
2,973,657
2,198,741
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 353
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 11 / 32223
ON S ABERDEEN ST FROM W 114TH PL TO W 115TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S ASHLAND AVE FROM W 116TH ST TO W 117TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S ASHLAND AVE FROM W 118TH ST TO W 119TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S ASHLAND AVE FROM W 122ND ST TO W 123RD ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S CARPENTER ST FROM W 116TH ST TO W 117TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S ELIZABETH ST FROM W 117TH ST TO W 118TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S EMERALD AVE FROM W 108TH ST TO W 109TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S EMERALD AVE FROM W 110TH ST TO W 111TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S EMERALD AVE FROM W 112TH ST TO W 113TH ST
.0
03/14/07
04/18/07
0
0
0
300 11 / 32223
ON S GREEN ST FROM W 103RD ST TO W 104TH ST
.0
03/14/07
04/18/07
0
0
0
300 06 0274 / 5382
ON S GREEN ST FROM W 107TH ST TO W 110TH ST
.0
07/01/04
12/31/04
0 03/22/05
6,183
100
300 11 / 32223
ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST
.0
10/26/07
11/02/07
0
0
0
300 06 / 32277
ON S PEORIA ST FROM W 103RD ST TO W 104TH ST
.0
04/01/08
08/30/08
0
0
0
300 06 0274 / 5382
ON S PEORIA ST FROM W 107TH ST TO W 110TH ST
.0
07/01/04
12/31/04
0 03/22/05
11/10/06
6,183
100
300 06 0308 / 5414
ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
0
0
300 06 0274 / 5382
ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST
.0
07/01/04
12/31/04
0 03/22/05
11/10/06
6,183
100
300 06 0274 / 5382
ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST
.0
07/01/04
12/31/04
0 03/22/05
11/10/06
6,183
100
300 11 / 32223
ON W 111TH ST FROM S STATE ST TO S PERRY AVE
.0
03/14/07
04/18/07
7,500 03/14/07
04/18/07
0
100
300 06 / 32277
ON W 113TH PL FROM S STATE ST TO S PERRY AVE
.0
04/01/08
08/30/08
0
0
0
300 06 / 32277
ON W 113TH ST FROM S STATE ST TO S PERRY AVE
.0
04/01/08
08/30/08
0
0
0
210 06 0243 / 4480
W 119TH ST AND S HALSTED ST
.0
0
0
0
210 06 0243 / 4480
W 99TH ST AND S HALSTED ST
.0
0
0
0
300 06 / 32275
11900-12100 S YALE AVE
.0
03/01/07
10/31/07
3,900 03/01/07
03/22/07
2,495
100
300 06 0292 / 5399
849 W 115TH ST
1.0
05/27/05
07/25/05
1,000 05/27/05
07/25/05
475
100
Totals per Design/Engineering
1.0
12,400
10/05/05
27,702
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 354
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON S EMERALD AVE FROM W 119TH ST TO W 122ND ST
8.0
10/25/01
10/27/01
1,414 09/29/01
09/29/01
1,624
100
300 09 / 33100
ON W 104TH PL FROM S MORGAN ST TO S RACINE AVE
7.0
02/01/08
12/31/08
2,800 09/02/08
09/05/08
1,925
100
300 06 0069 / 5233
800-1014 E 104TH ST
7.0
2,625 05/08/02
05/08/02
2,625
100
302 00 0092 / 5774
11839 S BISHOP ST
1.0
09/25/01
09/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
11629 S GREEN ST
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
206
100
302 00 0092 / 5774
11914-11945 S LOWE AVE
4.0
10/25/01
10/27/01
1,178 09/29/01
09/29/01
824
100
302 00 0092 / 5774
10232 S MORGAN ST
1.0
10/20/01
10/21/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
11832 S STEWART AVE
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
12039 S UNION AVE
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
12051 S UNION AVE
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
12017 S WALLACE ST
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
11731 S YALE AVE
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
215-341 W 111TH PL
8.0
10/20/01
10/21/01
1,885 09/29/01
09/29/01
1,885
100
302 00 0092 / 5774
307 W 118TH ST
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
302 00 0092 / 5774
751 W 118TH ST
1.0
10/25/01
10/27/01
236 09/29/01
09/29/01
236
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 07 0034 / 5457
ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
Totals per 400 Watt Changeout Totals per Lighting/Electrical
44.0
12,262
11,213
Fixtures 25.0
09/05/06
09/15/06
10,000 09/28/06
10/12/06
13,152
100
7.0
12/15/08
01/09/09
2,800 12/15/08
01/09/09
2,366
100
32.0
12,800
15,518
2,139,061
2,015,857
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 355
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 300 06 0069 / 5233
ON W 112TH PL FROM S MAY ST TO S LAFLIN ST
300 06 0069 / 5233
ON W 112TH ST FROM S ABERDEEN ST TO S THROOP ST
300 06 0069 / 5233
ON W 112TH ST FROM S RACINE AVE TO S LAFLIN ST
300 06 0069 / 5233
Installations 14.0
0 07/17/02
07/17/02
4,900
100
5.0
0 07/16/02
07/16/02
1,750
100
14.0
0 07/17/02
07/17/02
4,900
100
ON W 115TH ST FROM S MAY ST TO S JUSTINE ST
3.0
0 07/23/02
07/23/02
1,050
100
300 06 0069 / 5233
9956 S ABERDEEN ST
1.0
0 07/12/02
07/12/02
350
100
300 06 0069 / 5233
10054 S ABERDEEN ST
1.0
0 07/19/02
07/19/02
350
100
300 06 0069 / 5233
10114-10142 S ABERDEEN ST
3.0
0 07/12/02
07/12/02
1,050
100
300 06 0204 / 5327
10241 S ABERDEEN ST
1.0
08/08/01
08/08/01
320 09/29/01
09/29/01
320
100
805 06 1552 / 7738
12221 S ABERDEEN ST
1.0
10/14/97
10/14/97
0 10/14/97
10/14/97
300
100
805 06 1574 / 7760
12257 S ABERDEEN ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1553 / 7739
12258 S ABERDEEN ST
1.0
10/14/97
10/14/97
0 10/14/97
10/14/97
300
100
300 06 0069 / 5233
11313 S BISHOP ST
1.0
01/15/03
01/15/03
350 01/13/03
01/13/03
301
100
302 00 0092 / 5774
11518 S BISHOP ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11554 S BISHOP ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11626 S BISHOP ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11636 S BISHOP ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11736 S BISHOP ST
1.0
0 10/04/01
10/09/01
236
100
805 06 1697 / 7883
11759 S BISHOP ST
1.0
0 06/23/97
06/23/97
300
100
300 06 0069 / 5233
9954 S CARPENTER ST
1.0
0 07/12/02
07/12/02
350
100
302 00 0092 / 5774
11559 S CARPENTER ST
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
11658 S CARPENTER ST
1.0
0 07/15/02
07/15/02
350
100
805 06 1571 / 7757
12208 S CARPENTER ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1563 / 7749
12257 S CARPENTER ST
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
302 00 0092 / 5774
12258 S EMERALD AVE
1.0
0 01/17/02
01/17/02
236
100
300 06 0069 / 5233
10701-10758 S GLENROY AVE
5.0
0 07/15/02
07/15/02
1,750
100
805 06 1569 / 7755
12150 S GREEN ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1570 / 7756
12156 S GREEN ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1585 / 7771
12257 S GREEN ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1097 / 7283
12803 S GREEN ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 1098 / 7284
12815 S GREEN ST
1.0
08/22/95
08/22/95
0 08/22/95
08/22/95
300
100
805 06 1127 / 7313
10958 S HALSTED ST
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
06/23/97
06/23/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 356
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1683 / 7869
11112 S HALSTED ST
1.0
0 06/25/97
06/25/97
300
100
302 00 0092 / 5774
11710 S HALSTED ST
1.0
0 01/23/02
01/23/02
236
100
302 00 0092 / 5774
11736 S HALSTED ST
1.0
0 01/23/02
01/23/02
236
100
302 00 0092 / 5774
11759 S HALSTED ST
1.0
0 01/23/02
01/23/02
236
100
302 00 0092 / 5774
11800 S HALSTED ST
1.0
0 01/18/02
01/18/02
236
100
805 06 1608 / 7794
11511 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1609 / 7795
11514 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1611 / 7797
11533 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1612 / 7798
11538 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1613 / 7799
11600 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1614 / 7800
11617 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1615 / 7801
11636 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1725 / 7911
11658 S JUSTINE ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1616 / 7802
11740 S JUSTINE ST
1.0
09/22/97
09/22/97
0 09/22/97
09/22/97
300
100
805 06 1729 / 7915
11758 S JUSTINE ST
1.0
05/29/97
05/29/97
0 05/29/97
05/29/97
300
100
302 00 0092 / 5774
10730 S LA SALLE ST
1.0
0 12/27/01
12/27/01
236
100
300 06 0069 / 5233
11806-11816 S LA SALLE ST
2.0
0 07/15/02
07/15/02
700
100
805 06 1592 / 7778
10522 S LAFAYETTE AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1593 / 7779
10554 S LAFAYETTE AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1595 / 7781
10610 S LAFAYETTE AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1588 / 7774
11536 S LAFLIN ST
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
805 06 1696 / 7882
11659 S LAFLIN ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1589 / 7775
11754 S LAFLIN ST
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
300 06 0069 / 5233
11253-11258 S LOOMIS ST
2.0
0 07/16/02
07/16/02
700
100
302 00 0092 / 5774
11719 S LOOMIS ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11737 S LOOMIS ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11757 S LOOMIS ST
1.0
0 10/04/01
10/09/01
236
100
805 06 1698 / 7884
11836 S LOOMIS ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1665 / 7851
11012 S LOWE AVE
1.0
08/18/97
08/18/97
0 08/18/97
08/18/97
300
100
805 06 1846 / 8032
12218 S LOWE AVE
1.0
03/13/96
03/13/96
0 03/13/96
03/13/96
300
100
805 06 1848 / 8034
12223 S LOWE AVE
1.0
03/13/96
03/13/96
0 03/13/96
03/13/96
300
100
06/25/97
06/25/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 357
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0069 / 5233
9957-10048 S MAY ST
3.0
0 07/19/02
07/19/02
1,050
100
300 06 0069 / 5233
11250 S MAY ST
1.0
0 07/16/02
07/16/02
350
100
302 00 0092 / 5774
11559 S MAY ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11601 S MAY ST
1.0
0 10/04/01
10/09/01
236
100
805 06 1561 / 7747
12204 S MAY ST
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
805 06 1577 / 7763
12204 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1562 / 7748
12209 S MAY ST
1.0
09/29/97
09/29/97
0 09/29/97
09/29/97
300
100
805 06 1578 / 7764
12209 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1579 / 7765
12215 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1580 / 7766
12218 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1582 / 7768
12241 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1584 / 7770
12244 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1586 / 7772
12258 S MAY ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
302 00 0092 / 5774
11514 S MORGAN ST
1.0
0 10/04/01
10/09/01
236
100
805 06 1573 / 7759
12243 S MORGAN ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1955 / 8141
12717 S MORGAN ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 1956 / 8142
12901 S MORGAN ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 0608 / 6794
11506 S PARNELL AVE
1.0
04/03/95
04/03/95
0 04/03/95
04/03/95
300
100
300 06 0069 / 5233
10118-10156 S PEORIA ST
3.0
0 07/23/02
07/23/02
1,050
100
805 06 1566 / 7752
12217 S PEORIA ST
1.0
09/30/97
09/30/97
0 09/30/97
09/30/97
300
100
805 06 1557 / 7743
12228 S PEORIA ST
1.0
10/17/97
10/17/97
0 10/17/97
10/17/97
300
100
805 06 1567 / 7753
12228 S PEORIA ST
1.0
09/30/97
09/30/97
0 09/30/97
09/30/97
300
100
805 06 1581 / 7767
12237 S PEORIA ST
1.0
09/26/97
09/26/97
0 09/26/97
09/26/97
300
100
805 06 1572 / 7758
12238 S PEORIA ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1546 / 7732
12257 S PEORIA ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1547 / 7733
12258 S PEORIA ST
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 0548 / 6734
12806 S PEORIA ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 0532 / 6718
12814 S PEORIA ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 0550 / 6736
12841 S PEORIA ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
302 00 0092 / 5774
11654 S PRINCETON AVE
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
10123-10143 S RACINE AVE
2.0
0 07/19/02
07/19/02
700
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 358
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0069 / 5233
11401-11421 S RACINE AVE
2.0
0 07/16/02
07/16/02
700
100
300 06 0069 / 5233
11424-11432 S RACINE AVE
2.0
0 07/23/02
07/23/02
700
100
302 00 0092 / 5774
11557 S RACINE AVE
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
11558 S RACINE AVE
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
11701 S RACINE AVE
1.0
0 07/15/02
07/15/02
350
100
805 06 1705 / 7891
12125 S RACINE AVE
1.0
0 06/24/97
06/24/97
300
100
300 06 0069 / 5233
10056-10154 S SANGAMON ST
4.0
0 07/12/02
07/12/02
1,400
100
805 06 1787 / 7973
12201 S SANGAMON ST
1.0
10/09/87
10/09/87
0 10/09/87
10/09/87
300
100
805 06 0635 / 6821
12805 S SANGAMON ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 0636 / 6822
12806 S SANGAMON ST
1.0
08/23/95
08/23/95
0 08/23/95
08/23/95
300
100
805 06 1617 / 7803
10432 S STATE ST
1.0
09/24/97
09/24/97
0 09/24/97
09/24/97
300
100
805 06 1594 / 7780
10558 S STATE ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 0448 / 6634
12245 S STEWART AVE
1.0
09/21/95
09/21/95
0 09/21/95
09/21/95
300
100
300 06 0069 / 5233
11443 S THROOP ST
1.0
0 07/23/02
07/23/02
350
100
805 06 0346 / 6532
12209 S UNION AVE
1.0
03/13/96
03/13/96
0 03/13/96
03/13/96
300
100
805 06 0384 / 6570
10857 S WALLACE ST
1.0
04/16/96
04/16/96
0 04/16/96
04/16/96
300
100
805 06 0385 / 6571
11000 S WALLACE ST
1.0
07/31/96
07/31/96
0 07/31/96
07/31/96
300
100
805 06 1650 / 7836
10334 S WENTWORTH AVE
1.0
09/11/97
09/11/97
0 09/11/97
09/11/97
300
100
805 06 1620 / 7806
10454 S WENTWORTH AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1596 / 7782
10650 S WENTWORTH AVE
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1626 / 7812
10900 S WENTWORTH AVE
1.0
09/17/97
09/17/97
0 09/17/97
09/17/97
300
100
300 06 0069 / 5233
1101-1155 W 101ST ST
2.0
0 07/19/02
07/19/02
700
100
300 06 0069 / 5233
1125-1133 W 101ST ST
2.0
0 07/12/02
07/12/02
700
100
300 06 0069 / 5233
1156 W 102ND ST
1.0
0 07/19/02
07/19/02
350
100
300 06 0204 / 5327
1058 W 103RD ST
1.0
08/08/01
08/08/01
320 09/29/01
09/29/01
320
100
805 06 1618 / 7804
23 W 104TH PL
1.0
09/24/97
09/24/97
0 09/24/97
09/24/97
300
100
805 06 1607 / 7793
63 W 104TH PL
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
805 06 1631 / 7817
143 W 104TH PL
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
805 06 1632 / 7818
215 W 104TH PL
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
805 06 1633 / 7819
225 W 104TH PL
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
805 06 1635 / 7821
311 W 104TH PL
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
06/24/97
06/24/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 359
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1627 / 7813
118 W 105TH ST
1.0
09/17/97
09/17/97
0 09/17/97
09/17/97
300
100
805 06 1634 / 7820
246 W 105TH ST
1.0
09/19/97
09/19/97
0 09/19/97
09/19/97
300
100
302 00 0092 / 5774
264 W 107TH PL
1.0
0 01/18/02
01/18/02
236
100
805 06 0932 / 7118
338 W 109TH ST
1.0
09/21/95
09/21/95
0 09/21/95
09/21/95
300
100
805 06 0957 / 7143
433 W 110TH PL
1.0
07/02/96
07/02/96
0 07/02/96
07/02/96
300
100
805 06 1709 / 7895
443 W 111TH ST
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
805 06 1710 / 7896
500 W 111TH ST
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
300 06 0139 / 5289
507 W 111TH ST
2,100.0
03/01/06
09/01/06
51,217 07/01/06
07/18/06
63,449
100
302 00 0092 / 5774
507 W 111TH ST
65.0
0 01/30/01
01/24/02
15,317
100
805 06 1605 / 7791
524 W 111TH ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 1576 / 7762
534 W 111TH ST
1.0
09/25/97
09/25/97
0 09/25/97
09/25/97
300
100
805 06 0940 / 7126
319 W 112TH PL
1.0
11/08/95
11/08/95
0 11/08/95
11/08/95
300
100
300 06 0069 / 5233
1101-1157 W 112TH PL
3.0
0 07/16/02
07/16/02
1,050
100
805 06 1628 / 7814
43 W 112TH ST
1.0
09/17/97
09/17/97
0 09/17/97
09/17/97
300
100
300 06 0069 / 5233
1427 W 112TH ST
1.0
01/15/03
01/15/03
350 01/13/03
01/13/03
301
100
805 06 0942 / 7128
350 W 113TH ST
1.0
09/01/95
09/01/95
0 09/01/95
09/01/95
300
100
805 06 0943 / 7129
12 W 115TH ST
1.0
11/13/96
11/13/96
0 11/13/96
11/13/96
300
100
805 06 0945 / 7131
13 W 115TH ST
1.0
08/05/96
08/05/96
0 08/05/96
08/05/96
300
100
302 00 0092 / 5774
956 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1035 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1150 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
1218 W 115TH ST
1.0
0 07/15/02
07/15/02
350
100
302 00 0092 / 5774
1218 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1223 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1227 W 115TH ST
1.0
0 10/04/01
10/09/01
236
100
805 06 1603 / 7789
1525 W 115TH ST
1.0
0 09/25/97
09/25/97
300
100
302 00 0092 / 5774
307 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
321 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
322 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
354 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
422 W 116TH ST
1.0
0 07/15/02
07/15/02
350
100
09/25/97
09/25/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 360
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0092 / 5774
422 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
503 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
522 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
951 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
959 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1003 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
1025 W 116TH ST
1.0
0 07/15/02
07/15/02
350
100
302 00 0092 / 5774
1105 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
302 00 0092 / 5774
1219 W 116TH ST
1.0
0 10/04/01
10/09/01
236
100
300 06 0069 / 5233
105-123 W 118TH ST
2.0
0 07/15/02
07/15/02
700
100
805 06 1699 / 7885
1400 W 119TH ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1700 / 7886
1420 W 119TH ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1702 / 7888
1434 W 119TH ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 1706 / 7892
1456 W 119TH ST
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
805 06 1703 / 7889
1500 W 119TH ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
805 06 0946 / 7132
535 W 123RD ST
1.0
03/28/96
03/28/96
0 03/28/96
03/28/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
507 W 111TH ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
507 W 111TH ST
2,389.0
52,557
147,648
Lamps 1,622.0
06/01/07
12/31/07
47,751 01/10/08
01/28/08
46,308
100
0 08/21/02
09/03/02
27,622
100
Installations 1,517.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 361
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 07 0034 / 5457
ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST
8.0
4,000 09/01/06
09/11/06
4,208
100
302 00 0092 / 5774
330 W 104TH ST
1.0
0 08/22/01
08/22/01
345
100
302 00 0092 / 5774
111 W 108TH PL
1.0
0 06/20/01
06/20/01
471
100
302 00 0092 / 5774
127 W 108TH PL
1.0
0 06/20/01
06/20/01
471
100
302 00 0092 / 5774
141 W 108TH PL
1.0
0 06/20/01
06/20/01
471
100
302 00 0092 / 5774
153 W 108TH PL
1.0
0 06/20/01
06/20/01
471
100
300 06 0167 / 5306
314 W 108TH ST
3.0
0 04/08/99
04/08/99
1,053
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
849 W 115TH ST
Work Type: Ornamental - Piggyback Lighting 300 07 0034 / 5457
ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 300 11 / 32223
ON W 111TH ST FROM S STATE ST TO S PERRY AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
507 W 111TH ST
09/05/06
09/15/06
16.0
4,000
7,490
Projects .0
03/01/05
12/31/05
0 08/11/05
08/11/05
0
100
25.0
09/05/06
09/15/06
33,750 09/28/06
10/12/06
21,406
100
7.0
12/15/08
01/09/09
9,450 12/15/08
01/09/09
8,022
100
Fixtures
32.0
43,200
29,428
Blocks 1.0
06/01/07
09/15/07
03/01/08
12/01/08
350,000 06/01/07
01/18/08
329,000
100
0
0
Lamps .0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 362
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 06 0298 / 5405
ON S JUSTINE ST FROM W 120TH ST TO W 121ST ST
1.0
06/25/05
07/25/05
0 06/13/05
08/12/05
59,100
100
300 06 0298 / 5405
ON S LAFLIN ST FROM W 120TH ST TO W 121ST ST
1.0
07/01/05
09/01/05
0 06/13/05
08/12/05
59,100
100
300 11 / 32223
ON S LAFLIN ST FROM W 121ST ST TO W 122ND ST
.0
11/07/07
12/07/07
0
0
0
300 06 / 32277
ON S PEORIA ST FROM W 103RD ST TO W 104TH ST
.0
05/04/08
12/31/08
0
0
0
300 06 0308 / 5414
ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST
2.0
06/13/06
09/20/06
148,758 06/13/06
09/20/06
146,295
100
300 07 0034 / 5457
ON S SANGAMON ST FROM W 109TH ST TO W 111TH ST
2.0
06/12/06
08/18/06
50,000 06/13/06
09/20/06
50,000
100
300 06 / 32277
ON W 113TH PL FROM S STATE ST TO S PERRY AVE
.0
05/04/08
12/31/08
0
0
0
300 06 / 32277
ON W 113TH ST FROM S STATE ST TO S PERRY AVE
.0
05/04/08
12/31/08
0
0
0
300 06 / 32275
11900-12100 S YALE AVE
2.0
04/01/07
12/31/07
90,006
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
8.0
153,104 04/06/07
07/06/07
351,862
404,501
Blocks
300 06 0235 / 5349
ON S JUSTINE ST FROM W 121ST ST TO W 123RD ST
1.0
10/01/03
12/01/03
109,352 08/25/03
10/27/03
81,113
100
300 06 0267 / 5375
ON W 107TH PL FROM S MORGAN ST TO S ABERDEEN ST
2.0
09/20/04
11/20/04
148,413 08/31/04
12/10/04
142,617
100
300 06 0235 / 5349
ON W 109TH ST FROM S MORGAN ST TO S BEVERLY AVE
1.0
03/03/03
05/14/03
93,962 04/17/03
07/18/03
87,636
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
4.0
351,727
311,366
Locations
302 00 0092 / 5774
11500 S RACINE AVE
2.0
0 02/16/01
02/16/01
756
100
302 00 0092 / 5774
11613 S RACINE AVE
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
11651 S RACINE AVE
1.0
0 02/16/01
02/16/01
378
100
302 00 0092 / 5774
11700 S RACINE AVE
1.0
0 02/16/01
02/16/01
378
100
5.0
0
Totals per Short Arm Installs - Residntl
1,890
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 363
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 07 0034 / 5457
ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST
302 00 0076 / 5764
ON S HALSTED ST FROM W 103RD ST TO W 119TH ST
300 09 / 33075
ON W 103RD ST FROM S STATE ST TO S WENTWORTH AVE
300 07 0034 / 5457
Locations 25.0
11/17/05
04/03/06
6,250 05/20/06
06/01/06
7,000
100
300.0
03/20/98
04/16/98
0 03/20/98
04/16/98
5,100
100
7.0
09/05/08
09/12/08
2,100 09/05/08
09/12/08
1,470
100
ON W 111TH ST FROM S HALSTED ST TO S PERRY AVE
.0
04/18/06
11/18/06
2,700
0
100
300 07 0034 / 5457
ON W 111TH ST FROM S PERRY AVE TO S HALSTED ST
60.0
04/18/06
11/18/06
15,452 06/06/07
07/01/07
0
100
300 09 / 33100
11200-11300 S GREEN ST
4.0
07/01/08
07/07/08
800 07/01/08
07/07/08
504
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
396.0
27,302
14,074
Blocks
300 06 0247 / 5357
ON S ABERDEEN ST FROM W 122ND ST TO W 123RD ST
1.0
09/01/03
10/01/03
115,000 09/30/04
06/17/05
100,162
100
300 06 0247 / 5357
ON S DAVOL ST FROM W EDMAIRE ST TO W MONTEREY AVE
2.0
08/01/03
10/01/03
118,000 08/01/03
09/23/03
117,028
100
300 06 0274 / 5382
ON S GREEN ST FROM W 107TH ST TO W 110TH ST
3.0
11/04/05
12/18/06
225,000 11/04/05
12/18/06
103,028
100
300 06 0274 / 5382
ON S PEORIA ST FROM W 107TH ST TO W 110TH ST
3.50
11/04/05
12/18/06
265,000 11/04/05
12/18/06
103,028
100
300 06 0274 / 5382
ON W 108TH ST FROM S HALSTED ST TO S SANGAMON ST
.50
04/27/06
12/18/06
40,000 04/27/06
12/18/06
103,028
100
300 06 0274 / 5382
ON W 109TH ST FROM S SANGAMON ST TO S HALSTED ST
1.50
04/27/06
12/18/06
115,000 04/27/06
12/18/06
103,028
100
300 06 0204 / 5327
10200-10299 S ABERDEEN ST
4.0
10/08/01
10/08/01
840 09/29/01
09/29/01
840
100
15.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
507 W 111TH ST
Work Type: Underpass Lighting 805 06 2357 / 8543
500 E 115TH ST
878,840
630,142
Lamps 1,300.0
03/01/04
12/01/04
6,760 07/31/06
08/14/06
14,157
100
03/26/96
03/26/96
0 03/26/96
03/26/96
25,500
100
Fixtures 34.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 364
1/1/2008 AND 12/31/2008
Ward 34 Carrie M Austin CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install
Locations
210 06 0243 / 4480
W 119TH ST AND S HALSTED ST
.0
04/01/06
04/01/07
0
0
0
210 06 0243 / 4480
W 99TH ST AND S HALSTED ST
.0
04/01/06
04/01/07
0
0
0
0
0
Totals per Pedestrian Countdown Signal Install
.0
Work Type: Removal Temp Wiring - Signals
Crossings
S HALSTED ST AND W VERMONT ST
1.0
300 06 0197 / 5322
Work Type: Signals 300 06 0096 / 5258
507 W 111TH ST
Work Type: TSM Install
4,000 04/27/01
05/08/01
4,603
100
0 08/08/03
08/18/03
3,795
100
Intersections 24.0
08/11/03
08/22/03
Locations
814 06 0236 / 16448
10700 S HALSTED ST
1.0
01/01/90
01/01/90
0 01/01/90
01/01/90
8,000
100
210 06 0107 / 4367
11900 S HALSTED ST
1.0
06/01/01
12/01/01
150,000 05/31/01
01/01/02
182,777
100
814 06 0129 / 16343
11100 S HAMLET AVE
1.0
06/29/94
06/29/94
0 06/29/94
06/29/94
85,414
100
814 06 0128 / 16342
11100 S MARSHFIELD AVE
1.0
06/29/94
06/29/94
0 06/29/94
06/29/94
52,414
100
814 06 0249 / 16461
10300 S WENTWORTH AVE
1.0
08/04/89
08/04/89
0 08/04/89
08/04/89
96,863
100
5.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 07 0034 / 5457
ON S ASHLAND AVE FROM W 119TH ST TO W 122ND ST
Totals per Traffic
150,000
425,468
Locations 1.0
11/17/05
04/03/06
200 05/20/06
06/01/06
282
154,200
434,148
Totals per Construction Phase
2,293,261
2,450,005
Totals for Ward 34
2,305,661
2,477,707
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 365
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32146
ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
.50
05/01/07
10/31/07
0
0
100
300 06 / 32146
ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
.50
05/01/07
10/31/07
0
0
100
300 06 0308 / 5414
ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE
.0
02/01/06
07/31/06
0 02/01/06
3,127
100
300 06 / 32146
ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
.0
05/01/07
10/31/07
5,000
2,500
100
300 06 / 32277
.0
04/01/08
08/30/08
0
0
0
210 06 0208 / 4451
ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT BLVD W ADDISON ST AND N LAWNDALE AVE
.0
07/01/04
10/01/04
300 06 0282 / 5390
3326 W FULLERTON AVE
1.0
09/15/04
09/15/04
Totals per Design/Engineering
2.0
07/31/06
0 1,700 09/01/04 6,700
09/15/04
0
0
1,627
100
7,254
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 366
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON N AVERS AVE FROM W ALTGELD ST TO W DIVERSEY AVE
4.0
11/05/01
11/05/01
1,029 10/04/01
10/04/01
824
100
300 09 / 33101
ON N CHRISTIANA AVE FROM W WELLINGTON AVE TO W BARRY AVE
3.0
09/02/08
09/05/08
1,200 09/02/08
09/05/08
717
100
302 00 0092 / 5774
ON N HAMLIN AVE FROM W ALTGELD ST TO W DIVERSEY AVE
18.0
11/10/01
11/10/01
2,058 10/09/01
10/09/01
3,708
100
300 09 / 33101
ON N HAMLIN AVE FROM W ALTGELD ST TO W PALMER ST
9.0
09/11/08
09/15/08
3,800 09/11/08
09/15/08
2,151
100
300 06 0069 / 5233
ON N HAMLIN AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
9.0
10/01/02
10/01/02
3,789 09/25/02
09/25/02
1,877
100
302 00 0092 / 5774
ON N LAWNDALE AVE FROM W ALTGELD ST TO W DIVERSEY AVE
10.0
11/10/01
11/10/01
2,058 10/09/01
10/09/01
1,648
100
300 06 0069 / 5233
ON N LAWNDALE AVE FROM W BELDEN AVE TO W DIVERSEY AVE
15.0
0 02/04/02
02/04/02
5,625
100
300 09 / 33101
ON N LAWNDALE AVE FROM W BELDEN AVE TO W FULLERTON AVE
1.0
09/02/08
09/05/08
400 09/02/08
09/05/08
239
100
302 00 0092 / 5774
ON N MONTICELLO AVE FROM W ALTGELD ST TO W DIVERSEY AVE
5.0
11/05/01
11/05/01
2,058 10/09/01
10/09/01
1,029
100
300 09 / 33101
ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE
.08
09/02/08
09/03/08
32 09/02/08
09/03/08
19
100
302 00 0092 / 5774
ON N RIDGEWAY AVE FROM W ALTGELD ST TO W DIVERSEY AVE
9.0
11/01/01
11/01/01
2,058 10/04/01
10/04/01
1,854
100
300 06 0069 / 5233
ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
10.0
10/01/02
10/01/02
4,211 09/25/02
09/25/02
2,086
100
300 09 / 33101
ON N SAWYER AVE FROM W BARRY AVE TO W BELMONT AVE
5.0
09/02/08
09/05/08
2,200 09/02/08
09/05/08
1,175
100
300 09 / 33101
5.0
09/03/08
09/08/08
2,200 09/03/08
09/08/08
1,175
100
300 09 / 33101
ON N SPAULDING AVE FROM N MILWAUKEE AVE TO W WRIGHTWOOD AVE ON N SPAULDING AVE FROM W BARRY AVE TO W WELLINGTON AVE
4.0
09/03/08
09/05/08
1,800 09/03/08
09/05/08
956
100
300 09 / 33101
ON N ST LOUIS AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE
8.0
09/05/08
09/09/08
3,400 09/05/08
09/09/08
1,912
100
300 09 / 33101
ON N TROY ST FROM W WELLINGTON AVE TO W BARRY AVE
3.0
09/02/08
09/04/08
1,200 09/02/08
09/04/08
717
100
300 06 0069 / 5233
ON W ALTGELD ST FROM N ST LOUIS AVE TO N SPRINGFIELD AVE
2.64
10/01/03
10/16/03
0 02/04/02
02/04/02
990
100
300 09 / 33101
ON W GRACE ST FROM N CENTRAL PARK AVE TO N MONTICELLO AVE
2.0
09/02/08
09/05/08
800 09/02/08
09/05/08
478
100
300 09 / 33101
ON W LYNDALE ST FROM N CALIFORNIA AVE TO N SACRAMENTO AVE
8.0
09/15/08
09/16/08
3,400 09/15/08
09/16/08
1,912
100
300 09 / 33101
ON W SCHUBERT AVE FROM N FRANCISCO AVE TO N KEDZIE AVE
6.0
09/02/08
09/05/08
2,600 09/02/08
09/05/08
1,434
100
300 09 / 33101
ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO W PALMER BLVD
9.0
09/16/08
09/19/08
3,800 09/16/08
09/19/08
2,151
100
302 00 0092 / 5774
2500 N MAPLEWOOD AVE
1.0
02/09/03
02/09/03
225 02/07/03
02/07/03
203
100
302 00 0092 / 5774
2542 N MONTICELLO AVE
1.0
01/12/02
01/12/02
210 01/09/02
01/09/02
203
100
302 00 0092 / 5774
2552 N MONTICELLO AVE
1.0
01/12/02
01/12/02
210 01/09/02
01/09/02
203
100
302 00 0092 / 5774
2610 N MONTICELLO AVE
1.0
01/12/02
01/12/02
210 01/09/02
01/09/02
203
100
302 00 0092 / 5774
2620 N MONTICELLO AVE
1.0
01/12/02
01/12/02
210 01/09/02
01/09/02
203
100
302 00 0092 / 5774
2143 N RICHMOND ST
1.0
0 01/16/02
01/16/02
203
100
300 06 0069 / 5233
1900 N SAWYER AVE
5.0
01/10/03
01/10/03
2,000 01/07/03
01/07/03
1,890
100
300 06 0069 / 5233
1900 N SPAULDING AVE
5.0
01/10/03
01/10/03
2,000 01/07/03
01/07/03
1,890
100
302 00 0092 / 5774
2700 N SPAULDING AVE
4.0
01/19/03
01/19/03
840 01/16/03
01/16/03
812
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 367
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
2852-2854 N SPAULDING AVE
1.0
205 10/05/01
10/05/01
205
100
300 06 0069 / 5233
2600-2699 N WHIPPLE ST
4.0
0 02/04/02
02/04/02
1,500
100
302 00 0092 / 5774
2868 W DICKENS AVE
1.0
0 01/16/02
01/16/02
203
100
302 00 0092 / 5774
3600-3640 W GEORGE ST
5.0
10/01/01
10/01/01
1,029 09/29/01
09/29/01
1,029
100
302 00 0092 / 5774
3000-3099 W LYNDALE ST
4.0
01/31/02
02/16/02
1,616 02/15/01
02/15/01
942
100
302 00 0092 / 5774
2868 W MC LEAN AVE
1.0
0 01/16/02
01/16/02
203
100
300 03 0030 / 4901
3800 W SCHUBERT AVE
4.0
1,500 10/18/04
10/20/04
917
100
300 06 0069 / 5233
3300-3399 W WRIGHTWOOD AVE
4.0
0 02/04/02
02/04/02
1,500
100
11/01/04
10/04/01
11/10/04
189.72
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
10/03/01
54,348
46,986
Fixtures
300 09 / 33101
ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD
6.0
08/25/08
09/10/08
2,600 09/09/08
09/10/08
1,992
100
300 06 0122 / 5275
ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE
.90
07/01/04
07/16/04
360 06/22/04
06/30/04
360
100
300 09 / 33101
ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE
3.0
09/08/08
09/09/08
1,200 09/08/08
09/09/08
996
100
300 06 0122 / 5275
ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE
18.0
10/10/03
10/15/03
9,000 10/20/03
10/30/03
7,830
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
27.90
13,160
11,178
2,654,346
1,896,672
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 368
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0766 / 6952
2959 N ALBANY AVE
1.0
09/18/96
09/18/96
0 09/18/96
09/18/96
300
100
805 06 1275 / 7461
2522 N CENTRAL PARK AVE
1.0
05/17/96
05/17/96
0 05/17/96
05/17/96
300
100
805 06 1732 / 7918
2618 N CENTRAL PARK AVE
1.0
06/02/97
06/02/97
0 06/02/97
06/02/97
300
100
302 00 0092 / 5774
3440 N CENTRAL PARK AVE
1.0
0 05/09/01
05/09/01
236
100
805 06 1161 / 7347
2937 N DAWSON AVE
1.0
03/23/95
03/23/95
0 03/23/95
03/23/95
300
100
805 06 0906 / 7092
2614 N FRANCISCO AVE
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
805 06 1456 / 7642
2953 N GRESHAM AVE
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 1078 / 7264
2415 N HAMLIN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1079 / 7265
2511 N HAMLIN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1052 / 7238
2525 N HAMLIN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1162 / 7348
2036 N KEDZIE AVE
1.0
03/23/95
03/23/95
0 03/23/95
03/23/95
300
100
302 00 0092 / 5774
2535 N KEDZIE AVE
27.0
0 01/25/01
01/07/02
6,363
100
805 06 2044 / 8230
2423 N KIMBALL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0322 / 6508
2544 N LAWNDALE AVE
1.0
06/18/96
06/18/96
0 06/18/96
06/18/96
300
100
805 06 0323 / 6509
2552 N LAWNDALE AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0325 / 6511
2602 N LAWNDALE AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0326 / 6512
2702 N LAWNDALE AVE
1.0
03/12/97
03/12/97
0 03/12/97
03/12/97
300
100
805 06 0327 / 6513
2730 N LAWNDALE AVE
1.0
03/12/97
03/12/97
0 03/12/97
03/12/97
300
100
805 06 1882 / 8068
2520 N MAPLEWOOD AVE
1.0
11/21/96
11/21/96
0 11/21/96
11/21/96
300
100
805 06 1869 / 8055
2601 N MILWAUKEE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1936 / 8122
2613 N MILWAUKEE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1937 / 8123
2625 N MILWAUKEE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1939 / 8125
2635 N MILWAUKEE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1940 / 8126
2641 N MILWAUKEE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1891 / 8077
2057 N MOZART ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0663 / 6849
2540 N RIDGEWAY AVE
1.0
03/12/97
03/12/97
0 03/12/97
03/12/97
300
100
805 06 0664 / 6850
2551 N RIDGEWAY AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0665 / 6851
2552 N RIDGEWAY AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0666 / 6852
2600 N RIDGEWAY AVE
1.0
06/13/96
06/13/96
0 06/13/96
06/13/96
300
100
805 06 0667 / 6853
2601 N RIDGEWAY AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 1675 / 7861
2610 N RIDGEWAY AVE
1.0
07/28/97
07/28/97
0 07/28/97
07/28/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 369
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1676 / 7862
2620 N RIDGEWAY AVE
1.0
07/28/97
07/28/97
0 07/28/97
07/28/97
300
100
805 06 0679 / 6865
2521 N SACRAMENTO AVE
1.0
10/08/96
10/08/96
0 10/08/96
10/08/96
300
100
805 06 0698 / 6884
2533 N SACRAMENTO AVE
1.0
04/17/96
04/17/96
0 04/17/96
04/17/96
300
100
805 06 0719 / 6905
2533 N SACRAMENTO AVE
1.0
10/08/96
10/08/96
0 10/08/96
10/08/96
300
100
300 06 0139 / 5289
2710 N SAWYER AVE
1,096.0
03/01/06
09/01/06
27,051 06/01/06
06/20/06
33,114
100
805 06 0638 / 6824
2715 N SAWYER AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
300
100
805 06 0639 / 6825
2747 N SAWYER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0640 / 6826
3022 N SAWYER AVE
1.0
02/10/95
02/10/95
0 02/10/95
02/10/95
300
100
805 06 1485 / 7671
2834 N SPAULDING AVE
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 0490 / 6676
1926 N WHIPPLE ST
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
805 06 0535 / 6721
1943 N WHIPPLE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0505 / 6691
1944 N WHIPPLE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1536 / 7722
2719 N WHIPPLE ST
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 1483 / 7669
2832 N WOODARD ST
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 0745 / 6931
3067 W ARMITAGE AVE
1.0
06/13/96
06/13/96
0 06/13/96
06/13/96
300
100
805 06 0734 / 6920
3501 W ARMITAGE AVE
1.0
04/30/96
04/30/96
0 04/30/96
04/30/96
300
100
805 06 0765 / 6951
3501 W ARMITAGE AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
300
100
805 06 0851 / 7037
3048 W BELDEN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1457 / 7643
3415 W DIVERSEY AVE
1.0
12/02/97
12/02/97
0 12/02/97
12/02/97
300
100
805 06 1035 / 7221
3535 W DIVERSEY AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
805 06 1016 / 7202
3557 W DIVERSEY AVE
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
805 06 0457 / 6643
2604 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 0491 / 6677
2612 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 0492 / 6678
2624 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 0493 / 6679
2632 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 0494 / 6680
2640 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 0478 / 6664
2652 W LOGAN BLVD
1.0
12/09/95
12/09/95
0 12/09/95
12/09/95
300
100
805 06 1803 / 7989
3214 W MC LEAN AVE
1.0
03/30/95
03/30/95
0 03/30/95
03/30/95
300
100
805 06 1836 / 8022
3219 W MC LEAN AVE
1.0
06/25/96
06/25/96
0 06/25/96
06/25/96
300
100
805 06 0616 / 6802
2713 W SCHUBERT AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0617 / 6803
2749 W SCHUBERT AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 370
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0439 / 6625
3541 W WOLFRAM ST
1.0
01/12/95
01/12/95
0 01/12/95
01/12/95
300
100
805 06 0468 / 6654
3760 W WRIGHTWOOD AVE
1.0
09/18/96
09/18/96
0 09/18/96
09/18/96
300
100
805 06 1657 / 7843
3767 W WRIGHTWOOD AVE
1.0
07/31/97
07/31/97
0 07/31/97
07/31/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
2710 N SAWYER AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
2535 N KEDZIE AVE
Work Type: Flood Light Install
1,186.0
27,051
58,313
Lamps 1,401.0
06/01/07
12/31/07
41,245 07/20/07
09/01/07
41,245
100
0 05/07/02
05/10/02
23,780
100
Installations 1,306.0
Fixtures
300 06 0198 / 5323
LAWNDALE GARDENS
20,563 05/29/01
05/30/01
12,106
100
300 06 0167 / 5306
N FRANCISCO AVE AND W WABANSIA AVE
2.50
0 06/01/99
06/01/99
539
100
300 06 0167 / 5306
W DIVERSEY AVE AND N AVERS AVE
3.50
0 06/10/99
06/10/99
1,229
100
302 00 0092 / 5774
2500 N LINDEN PL
1.0
0 08/13/01
08/13/01
345
100
302 00 0092 / 5774
2517 W LOGAN BLVD
1.0
0 02/14/01
02/14/01
471
100
302 00 0092 / 5774
2519 W LOGAN BLVD
1.0
0 02/14/01
02/14/01
471
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0282 / 5390
3326 W FULLERTON AVE
Work Type: Lighting Imprvmnts 300 06 0118 / 5272
2400 N CALIFORNIA AVE
03/08/01
05/22/01
9.0
20,563
15,161
Installations 1.0
2,800 09/20/04
09/23/04
2,349
100
77,376 09/11/00
06/05/01
77,431
100
Projects 1.0
10/30/00
06/29/01
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 371
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 09 / 33101
ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD
6.0
09/15/08
10/03/08
8,100 09/12/08
09/16/08
6,810
100
300 11 / 32222
ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST
11.55
11/01/07
12/01/07
15,725 03/13/08
04/04/08
13,060
100
300 11 / 32222
ON W BELMONT AVE FROM N SAWYER AVE TO N ROCKWELL ST
13.86
11/01/07
12/01/07
18,843 03/13/08
04/04/08
17,538
100
300 09 / 33101
ON W WRIGHTWOOD AVE FROM N AVERS AVE TO N HAMLIN AVE
3.0
09/10/08
09/19/08
4,050 09/10/08
09/19/08
3,375
100
300 06 0122 / 5275
ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE
18.0
10/15/03
10/18/03
24,000 10/20/03
10/30/03
18,269
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
2710 N SAWYER AVE
Work Type: Residntl Staggered Lighting
52.41
70,718
59,051
0
0
0
50
Lamps .0
03/01/08
12/01/08
Blocks
300 06 / 32146
ON N ALLEN AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
4.0
12/05/07
06/27/08
247,733 12/14/07
0
300 06 / 32146
ON N DAWSON AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
4.0
12/05/07
05/29/08
247,733 12/20/07
0
50
300 07 0035 / 5458
ON N DRAKE AVE FROM W SCHOOL ST TO N AVONDALE AVE
2.0
07/17/06
09/29/06
110,000 11/01/06
04/20/07
71,567
100
300 07 0035 / 5458
ON N MONTICELLO AVE FROM W SCHOOL ST TO W BELMONT AVE
3.0
08/07/06
10/06/06
255,000 09/11/06
11/17/06
162,122
100
300 07 0035 / 5458
ON N RICHMOND ST FROM W ARMITAGE AVE TO W BLOOMINGDALE AVE
2.0
05/11/06
07/17/06
140,000 05/11/06
07/24/06
127,515
100
300 06 0308 / 5414
Project has been completed. Note Last Updated on 25-AUG-06 ON N RICHMOND ST FROM W NORTH AVE TO W BLOOMINGDALE AVE
2.0
03/16/06
12/31/06
147,540 05/11/06
07/24/06
127,565
100
300 07 0035 / 5458
ON N RIDGEWAY AVE FROM W BELDEN AVE TO W FULLERTON AVE
1.0
08/01/06
09/22/06
85,000 10/16/06
04/20/07
43,621
100
300 06 / 32146
ON N WISNER AVE FROM N MILWAUKEE AVE TO N KIMBALL AVE
1.0
12/05/07
05/29/08
300 07 0035 / 5458
ON W BELDEN AVE FROM N HAMLIN AVE TO N LAWNDALE AVE
1.0
08/01/06
09/22/06
300 07 0035 / 5458
ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE
300 07 0035 / 5458
ON W MELROSE ST FROM N KIMBALL AVE TO N DRAKE AVE
300 06 / 32277
ON W SHAKESPEARE AVE FROM N CALIFORNIA AVE TO N HUMBOLDT BLVD
Totals per Residntl Staggered Lighting
.0
03/01/06
12/31/06
2.0
07/17/06
09/29/06
.0
05/04/08
12/31/08
22.0
247,733
0
75
04/20/07
43,755
100
0
0
04/20/07
71,567
100
0
0
0
1,675,739
647,712
85,000 10/16/06 0 110,000 11/01/06
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 372
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Strt Lighting/Lamps 300 03 0001 / 4872
ON N FRANCISCO AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE
300 03 0035 / 4906
ON N FRANCISCO AVE FROM W NORTH AVE TO W WABANSIA AVE
300 06 0232 / 5346
ON N LAWNDALE AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
2.0
10/28/02
12/28/02
150,000 10/28/02
12/20/02
128,918
100
300 06 0235 / 5349
ON N RIDGEWAY AVE FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
2.0
03/03/03
04/28/03
167,240 03/02/03
04/04/03
151,454
100
300 06 0267 / 5375
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
2.0
05/19/04
07/19/04
150,000 05/24/04
08/06/04
132,136
100
.50
06/01/04
09/01/04
40,000 05/29/04
07/09/04
40,000
100
06/01/04
09/01/04
40,000 05/24/04
07/09/04
40,000
100
6.50
547,240
492,508
Locations
302 00 0092 / 5774
2406 N LAWNDALE AVE
1.0
0 03/20/01
03/20/01
378
100
302 00 0092 / 5774
2412 N LAWNDALE AVE
1.0
0 03/20/01
03/20/01
378
100
302 00 0092 / 5774
2600 N MONTICELLO AVE
1.0
0 01/02/01
01/02/01
378
100
302 00 0092 / 5774
2436 N RIDGEWAY AVE
1.0
0 06/14/01
06/14/01
378
100
302 00 0092 / 5774
2448 N RIDGEWAY AVE
1.0
0 06/14/01
06/14/01
378
100
302 00 0092 / 5774
2454 N RIDGEWAY AVE
1.0
0 06/14/01
06/14/01
378
100
302 00 0092 / 5774
3608 W GEORGE ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3616 W GEORGE ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3626 W GEORGE ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3636 W GEORGE ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3640 W GEORGE ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3654 W GEORGE ST
1.0
0 03/28/01
03/28/01
378
100
302 00 0092 / 5774
2837 W MC LEAN AVE
1.0
0 03/20/01
03/20/01
378
100
302 00 0092 / 5774
2869 W MC LEAN AVE
1.0
0 03/20/01
03/20/01
378
100
302 00 0092 / 5774
3609 W WOLFRAM ST
1.0
0 02/09/01
02/09/01
378
100
302 00 0092 / 5774
3621 W WOLFRAM ST
1.0
0 02/09/01
02/09/01
378
100
Totals per Short Arm Installs - Residntl
16.0
0
6,048
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 373
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 04 0216 / 5114
ON N KEDZIE AVE FROM W BLOOMINGDALE AVE TO W ARMITAGE AVE
15.50
05/01/06
11/01/06
2,920 05/17/06
10/30/06
2,920
100
300 09 / 33101
ON N KIMBALL AVE FROM W BYRON ST TO W IRVING PARK RD
6.0
08/25/08
08/29/08
1,800 09/12/08
09/15/08
1,260
100
300 07 0035 / 5458
ON W BELMONT AVE FROM N SPAULDING AVE TO N KIMBALL AVE
3.0
04/18/06
11/18/06
845 10/02/06
10/20/06
0
100
300 07 0035 / 5458
ON W CORNELIA AVE FROM N AVONDALE AVE TO N MONTICELLO AVE
.0
03/01/06
12/31/06
0
0
0
302 00 0076 / 5764
ON W FULLERTON AVE FROM N DRAKE AVE TO N LAVERGNE AVE
50.0
09/01/00
12/31/00
0
850
300 06 0108 / 5263
ON W IRVING PARK RD FROM N CALIFORNIA AVE TO N ELSTON AVE
25.35
08/01/04
08/15/04
7,403 06/21/04
07/28/04
5,602
100
300 09 / 33101
ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N AVERS AVE
3.0
09/12/08
09/15/08
900 09/12/08
09/15/08
630
100
300 06 0108 / 5263
ON W WRIGHTWOOD AVE FROM N HAMLIN AVE TO N CENTRAL PARK AVE
18.0
09/10/03
09/18/03
7,000 08/28/03
08/29/03
3,780
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting 300 06 0111 / 5266
ON N CALIFORNIA AVE FROM W FULLERTON AVE TO W DIVERSEY AVE
303 00 0006 / 5783
2400 N MILWAUKEE AVE
20,868
Work Type: Traffic Signal Regrouping 2710 N SAWYER AVE
15,042
Blocks 3.48
08/01/00
09/30/00
0 11/01/98
12/15/98
36,834
100
08/01/97
12/01/97
60,000 08/01/97
04/30/98
76,547
100
3.48
Totals per Strt Lighting
300 06 0139 / 5289
120.85
60,000
113,381
Lamps 2,273.0
03/01/04
12/01/04
11,819 10/19/06
10/27/06
24,753
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 374
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
302 00 0072 / 5760
2830 N CALIFORNIA AVE
1.0
0 08/31/99
09/28/99
39,560
100
805 06 2793 / 8979
1799 N FRANCISCO AVE
6.0
04/13/94
04/13/94
0 04/13/94
04/13/94
4,500
100
805 06 2429 / 8615
3198 N KEDZIE AVE
12.0
01/02/96
01/02/96
0 01/02/96
01/02/96
9,000
100
302 00 0072 / 5760
3200 N KEDZIE AVE
1.0
0 09/27/99
10/22/99
24,706
100
300 06 0217 / 5337
2535 N KEDZIE BLVD
559.0
31,420 05/17/04
05/21/04
21,780
100
302 00 0072 / 5760
3200 N KIMBALL AVE
1.0
0 08/31/99
09/15/99
24,773
100
805 06 2437 / 8623
3338 N KIMBALL AVE
12.0
12/19/95
12/19/95
0 12/19/95
12/19/95
9,000
100
805 06 2399 / 8585
1798 N MOZART ST
10.0
10/16/95
10/16/95
0 10/16/95
10/16/95
7,500
100
805 06 2229 / 8415
3001 N SACRAMENTO AVE
8.0
10/29/96
10/29/96
0 10/29/96
10/29/96
6,000
100
302 00 0071 / 5759
2530 N WESTERN AVE
0 02/07/98
02/17/98
32,008
100
805 06 2683 / 8869
3653 W ADDISON ST
8.0
0 04/16/92
04/16/92
6,000
100
302 00 0072 / 5760
3210 W BELMONT AVE
1.0
0 09/16/99
09/24/99
14,025
100
302 00 0072 / 5760
3220 W BELMONT AVE
1.0
0 09/16/99
10/16/99
12,670
100
805 06 2794 / 8980
2929 W BLOOMINGDALE AVE
5.0
0 06/01/94
06/01/94
3,750
100
302 00 0072 / 5760
2800 W DIVERSEY AVE
1.0
0 08/02/99
09/03/99
46,462
100
Totals per Underpass Lighting
626.0
05/04/04
04/16/92
06/01/94
05/10/04
04/16/92
06/01/94
31,420
261,734
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 375
1/1/2008 AND 12/31/2008
Ward 35 Rey Colon CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 0073 / 4337
3400 W DIVERSEY AVE
Work Type: New Signal
Locations 1.0
06/01/03
07/01/03
ON W DICKENS AVE FROM N CALIFORNIA AVE TO N MOZART ST
1.0
09/01/04
09/30/04
210 06 0208 / 4451
W ADDISON ST AND N LAWNDALE AVE
.50
12/01/05
06/30/06
210 06 0131 / 4390
W FULLERTON AVE AND N AVERS AVE
.50
07/01/01
12/01/01
2.0
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N KIMBALL AVE AND W ARMITAGE AVE
Work Type: Signals 300 06 0096 / 5258
2724 N KEDZIE BLVD
Work Type: TSM Install
0
Locations
300 06 0283 / 5391
Totals per New Signal
50,000
11,807 09/09/04
09/09/04
112,500 85,000 05/31/01
11,807
100
0 08/02/01
209,307
47,668
100
59,475
Crossings .50
2,000 10/02/01
10/02/01
178
100
Intersections 32.0
11/01/03
11/01/03
0 11/01/03
11/07/03
5,060
100
Locations
210 06 0074 / 4338
N ROCKWELL ST AND W LOGAN BLVD
1.0
10/01/03
12/01/03
328,600 10/15/03
02/04/04
117,249
100
814 06 0273 / 16485
2800 N CALIFORNIA AVE
1.0
03/17/92
03/17/92
0 03/17/92
03/17/92
80,424
100
814 06 0120 / 16335
2812 N CALIFORNIA AVE
1.0
10/13/93
10/13/93
0 10/13/93
10/13/93
78,827
100
814 06 0108 / 16323
3600 N CENTRAL PARK AVE
1.0
10/26/94
10/26/94
0 10/26/94
10/26/94
83,419
100
814 06 0396 / 16583
3000 N KEDZIE AVE
1.0
04/19/91
04/19/91
0 04/19/91
04/19/91
96,382
100
814 06 0119 / 16334
3125 N KEDZIE AVE
1.0
10/27/92
10/27/92
0 10/27/92
10/27/92
78,827
100
814 06 0303 / 16515
3600 N KIMBALL AVE
1.0
02/20/90
02/20/90
0 02/20/90
02/20/90
44,226
100
814 06 0286 / 16498
3736 N KIMBALL AVE
1.0
11/20/91
11/20/91
0 11/20/91
11/20/91
123,207
100
814 06 0057 / 16273
2800 N SACRAMENTO AVE
1.0
04/16/91
04/16/91
0 04/16/91
04/16/91
96,382
100
814 06 0269 / 16481
3000 N SACRAMENTO AVE
1.0
12/23/91
12/23/91
0 12/23/91
12/23/91
35,000
100
814 06 0102 / 16317
3600 N ST LOUIS AVE
1.0
08/01/94
08/01/94
0 08/01/94
08/01/94
163,461
100
814 06 0124 / 16338
3648 W ADDISON ST
1.0
10/26/94
10/26/94
0 10/26/94
10/26/94
79,020
100
12.0
328,600
1,076,424
589,907
1,141,137
Totals per Construction Phase
3,244,253
3,037,808
Totals for Ward 35
3,250,953
3,045,062
Totals per TSM Install Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 376
1/1/2008 AND 12/31/2008
Ward 36 William J.P. Banks CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 / 32146
ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE
300 06 0308 / 5414
ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE
300 06 0282 / 5390 300 06 0292 / 5399
Projects 1.0
05/01/07
10/31/07
3,900 05/29/07
06/28/07
5,465
100
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,419
100
1713 N HARLEM AVE
1.0
08/19/04
08/26/04
1,000 08/19/04
08/26/04
1,000
100
6450 W BELMONT AVE
1.0
02/08/05
03/01/05
800 01/03/05
04/15/05
747
100
Totals per Design/Engineering
3.0
5,700
9,631
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 377
1/1/2008 AND 12/31/2008
Ward 36 William J.P. Banks CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 09 / 33102
ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE
Work Type: Alley Lighting/Lamps
Fixtures 14.0
06/09/08
06/13/08
5,600 06/09/08
06/13/08
3,025
100
Installations
805 06 1701 / 7887
3657 N CUMBERLAND AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1083 / 7269
1921 N HARLEM AVE
1.0
09/12/96
09/12/96
0 09/12/96
09/12/96
300
100
805 06 1877 / 8063
2838 N NATCHEZ AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1931 / 8117
3600 N NEVA AVE
1.0
12/12/96
12/12/96
0 12/12/96
12/12/96
300
100
805 06 1932 / 8118
3620 N NEVA AVE
1.0
12/12/96
12/12/96
0 12/12/96
12/12/96
300
100
805 06 1907 / 8093
3356 N NEWLAND AVE
1.0
08/12/96
08/12/96
0 08/12/96
08/12/96
300
100
805 06 1910 / 8096
2436 N NORMANDY AVE
1.0
09/27/96
09/27/96
0 09/27/96
09/27/96
300
100
805 06 0600 / 6786
3918 N OCTAVIA AVE
1.0
07/16/96
07/16/96
0 07/16/96
07/16/96
300
100
805 06 0576 / 6762
3617 N OLEANDER AVE
1.0
11/13/96
11/13/96
0 11/13/96
11/13/96
300
100
805 06 1727 / 7913
3433 N PANAMA AVE
1.0
05/28/97
05/28/97
0 05/28/97
05/28/97
300
100
300 06 0139 / 5289
6839 W BELMONT AVE
1,977.0
03/01/06
09/01/06
45,478 05/17/06
06/02/06
59,733
100
302 00 0092 / 5774
6839 W BELMONT AVE
2.0
0 07/12/01
10/03/01
471
100
805 06 0978 / 7164
6939 W DIVERSEY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0944 / 7130
7451 W FOREST PRESERVE AVE
1.0
06/28/96
06/28/96
0 06/28/96
06/28/96
300
100
805 06 1123 / 7309
7151 W GRAND AVE
1.0
12/20/96
12/20/96
0 12/20/96
12/20/96
300
100
805 06 1124 / 7310
7159 W GRAND AVE
1.0
12/20/96
12/20/96
0 12/20/96
12/20/96
300
100
805 06 1108 / 7294
7019 W HENDERSON ST
1.0
05/03/96
05/03/96
0 05/03/96
05/03/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
6839 W BELMONT AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
6839 W BELMONT AVE
Work Type: Flood Light Install
1,994.0
45,478
64,704
Lamps 1,783.0
06/01/07
12/31/07
52,491 08/20/07
09/15/07
52,491
100
0 05/08/02
05/11/02
31,190
100
Installations 1,713.0
Fixtures
302 00 0092 / 5774
2524 N SAYRE AVE
1.0
0 03/20/01
03/20/01
471
100
302 00 0092 / 5774
2558 N SAYRE AVE
1.0
0 03/20/01
03/20/01
471
100
2.0
0
Totals per Flood Light Install
942
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 378
1/1/2008 AND 12/31/2008
Ward 36 William J.P. Banks CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0292 / 5399
Installations
6450 W BELMONT AVE
.0
03/01/05
12/31/05
6,097 09/27/05
10/04/05
4,593
100
10/06/04
10/31/04
0 09/14/04
09/21/04
13,453
100
08/04/08
08/15/08
12,150 08/04/08
08/15/08
10,242
100
03/01/08
12/01/08
0
0
0
263,000
Operations project Note Last Updated on 01-NOV-07
Projects
Work Type: Lighting Imprvmnts 300 06 0282 / 5390
1713 N HARLEM AVE
.0
Fixtures
Work Type: Ornamental - Piggyback Lighting 300 09 / 33102
ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE
9.0
Lamps
Work Type: Residential Regrouping 300 06 0270 / 5378
6839 W BELMONT AVE
.0
Blocks
Work Type: Residntl Staggered Lighting 300 06 / 32146
ON N OTTAWA AVE FROM W ADDISON ST TO W FOREST PRESERVE AVE
4.0
07/15/07
03/15/08
0
95
300 06 0298 / 5405
ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY AVE
2.0
05/15/05
06/30/05
0 05/02/05
06/10/05
119,717
100
300 06 0308 / 5414
ON N SAYRE AVE FROM W WRIGHTWOOD AVE TO W GRAND AVE
2.0
04/18/06
06/02/06
179,830 05/30/06
07/28/06
121,255
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0122 / 5275
ON N NATCHEZ AVE FROM W BELDEN AVE TO W GRAND AVE
Work Type: Strt Light Pole Painting 300 04 0216 / 5114 300 09 / 33102
ON N NARRAGANSETT AVE FROM W FULLERTON AVE TO W DIVERSEY AVE ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE
302 00 0076 / 5764
ON W NORTH AVE FROM N NAGLE AVE TO N NASHVILLE AVE
Totals per Strt Light Pole Painting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
6839 W BELMONT AVE
Totals per Lighting/Electrical
8.0
442,830
240,972
Blocks 1.50
07/01/03
09/01/03
110,000 06/30/03
10/07/03
110,000
100
15.50
05/01/06
11/01/06
3,353 05/17/06
11/01/06
3,353
100
9.0
06/09/08
06/13/08
2,700 06/09/08
06/13/08
1,800
100
11.0
04/27/98
04/27/98
0 04/27/98
04/27/98
187
100
Locations
35.50
6,053
5,340
Lamps 1,139.0
03/01/04
12/01/04
5,922 10/17/06 686,621
10/19/06
12,404 549,356
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 379
1/1/2008 AND 12/31/2008
Ward 36 William J.P. Banks CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
300 06 0225 / 5340
1800 N NARRAGANSETT AVE
1.0
10/01/03
11/01/03
3,153 08/05/03
01/08/04
4,601
100
300 06 0225 / 5340
6400 W BLOOMINGDALE AVE
1.0
10/01/03
11/01/03
3,154 08/05/03
01/08/04
4,602
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
2.0
6,307
9,203
Locations
300 05 0036 / 5151
W ADDISON ST AND N HARLEM AVE
1.0
115,200 04/07/06
103,282
100
300 05 0036 / 5151
W ADDISON ST AND N OAK PARK AVE
.50
40,250 04/06/06
33,535
100
300 05 0036 / 5151
W BELMONT AVE AND N HARLEM AVE
1.0
98,300 02/20/06
106,761
100
Totals per Left Turn Arrow
Work Type: Signals 300 06 0096 / 5258
6839 W BELMONT AVE
Work Type: TSM Install
2.50
31.0
10/27/03
11/04/03
07/12/95
07/12/95
1.0
300 11 / 32225
6650 W DIVERSEY AVE
1.0
814 06 0069 / 16285
6700 W GRAND AVE
1.0
ON W GRAND AVE FROM N NORMANDY AVE TO N OAK PARK AVE
Totals per Traffic
10/17/03
4,902
100
0 07/12/95
07/12/95
127,326
100
7,000 09/16/94
09/16/94
3.0
Work Type: Traffic Equipment Painting
0 10/08/03
Locations
2100 N NARRAGANSETT AVE
Totals per TSM Install
243,578
Intersections
814 06 0059 / 16275
300 09 / 33102
253,750
0 09/16/94
09/16/94
7,000
0
0
101,159
100
228,485
Locations 2.0
06/09/08
06/13/08
2,900 06/09/08
06/13/08
1,230
269,957
487,398
Totals per Construction Phase
956,578
1,036,754
Totals for Ward 36
962,278
1,046,385
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 380
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0303 / 5409
ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE
.0
09/01/05
11/01/05
0 06/21/05
04/20/06
1,120
100
300 06 0308 / 5414
ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
354
100
300 06 / 32277
ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE
4.0
04/01/08
08/30/08
260,000 04/29/08
210 06 0127 / 4386
N CICERO AVE AND W DIVISION ST
1.0
12/15/05
03/15/06
0 12/15/05
210 06 / 32040
W DIVISION ST AND N LARAMIE AVE
.0
11/01/06
12/31/07
5,000
3,186
0
300 06 0292 / 5399
W NORTH AVE AND N KOSTNER AVE
1.0
04/01/05
04/25/05
5,000 02/03/05
02/15/05
5,000
100
300 06 0292 / 5399
4300 W DIVISION ST
1.0
01/22/05
02/04/05
1,000 01/03/05
02/10/05
742
100
Totals per Design/Engineering
7.0
271,000
02/14/06
0
70
470
100
10,872
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 381
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON N KARLOV AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
300 06 0069 / 5233
ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
8.0
06/16/02
06/16/02
1,680 06/13/02
06/13/02
1,680
100
16.0
05/02/02
05/02/02
3,600 04/30/02
04/30/02
2,734
300 09 / 33103
ON N LATROBE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
100
7.0
11/20/08
11/20/08
2,800 11/20/08
11/20/08
1,280
300 03 0037 / 4908
ON N LATROBE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
100
12.0
10/15/04
10/21/04
4,600 10/06/04
10/09/04
2,676
302 00 0092 / 5774
ON N LAVERGNE AVE FROM W CHICAGO AVE TO W IOWA ST
3.0
100
0 02/01/02
02/06/02
618
300 07 0037 / 5460
ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD
5.0
100
2,200 01/10/07
01/31/07
2,200
100
302 00 0092 / 5774
10620105 was found that work was don previously under work order at an earlier date. iris is being updated Note Last Updated on 25-FEB-08 ON N LAVERGNE AVE FROM W IOWA ST TO W AUGUSTA BLVD 3.0 0 02/01/02
02/06/02
618
100
302 00 0092 / 5774
ON N LECLAIRE AVE FROM W CHICAGO AVE TO W IOWA ST
3.0
0 02/01/02
02/06/02
618
100
300 07 0037 / 5460
ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST
5.0
2,200 04/18/06
11/18/06
2,200
100
302 00 0092 / 5774
ON N LECLAIRE AVE FROM W IOWA ST TO W AUGUSTA BLVD
3.0
0 02/01/02
02/06/02
618
100
300 06 0069 / 5233
ON N LECLAIRE AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
10.0
04/20/02
04/20/02
2,100 04/17/02
04/17/02
2,030
100
300 03 0037 / 4908
ON N LINDER AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
12.0
10/15/04
10/21/04
4,600 10/06/04
10/09/04
2,676
100
300 07 0037 / 5460
ON N LINDER AVE FROM W WABANSIA AVE TO W BLOOMINGDALE AVE
5.0
01/10/07
01/31/07
2,200 08/07/06
08/07/06
2,000
100
300 09 / 33103
ON N LOCKWOOD AVE FROM W GRAND AVE TO W FULLERTON AVE
11.0
10/22/08
10/22/08
4,400 10/22/08
10/22/08
2,869
100
300 03 0037 / 4908
ON N LOCKWOOD AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
12.0
10/15/04
10/21/04
4,600 10/06/04
10/09/04
2,676
100
300 06 0122 / 5275
ON N LONG AVE FROM W DIVISION ST TO W POTOMAC AVE
5.0
11/20/03
11/21/03
2,075 11/05/03
11/05/03
1,575
100
300 03 0037 / 4908
ON N LONG AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
10.0
10/15/04
10/21/04
3,850 10/06/04
10/09/04
2,230
100
300 03 0037 / 4908
ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
10.0
10/15/04
10/21/04
3,850 10/06/04
10/09/04
2,230
100
300 06 0122 / 5275
ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE
10.0
07/20/03
07/21/03
4,150 06/17/03
06/17/03
2,599
100
300 03 0037 / 4908
ON N LOTUS AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
10.0
10/15/04
10/21/04
3,850 10/06/04
10/09/04
2,230
100
300 03 0037 / 4908
ON N LUNA AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
7.0
10/15/04
10/21/04
2,625 10/06/04
10/09/04
1,561
100
300 07 0030 / 5453
ON N MONITOR AVE FROM W BELDEN AVE TO W BELMONT AVE
16.0
04/18/06
11/18/06
6,600
300 06 0069 / 5233
ON N PINE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
3.0
300 06 0069 / 5233
ON W AUGUSTA BLVD FROM N LONG AVE TO N CENTRAL AVE
300 06 0069 / 5233
ON W BLOOMINGDALE AVE FROM N CICERO AVE TO N LECLAIRE AVE
300 07 0037 / 5460
ON W CORTEZ ST FROM N LONG AVE TO N PINE AVE
5.0
01/10/07
300 07 0037 / 5460
ON W CRYSTAL ST FROM N PINE AVE TO N CENTRAL AVE
4.0
300 09 / 33103
ON W IOWA ST FROM N KOSTNER AVE TO N KILBOURN AVE
300 06 0122 / 5275 300 11 / 32226
01/10/07
04/18/06
01/31/07
11/18/06
0
0
0 04/25/02
04/25/02
1,125
100
10.0
0 04/25/02
04/25/02
3,750
100
17.0
5,825 04/15/02
04/17/02
6,375
100
01/31/07
2,100 01/10/07
01/31/07
2,100
100
01/10/07
01/31/07
1,700 01/10/07
01/31/07
1,700
100
5.0
08/25/08
08/25/08
2,000 08/25/08
08/25/08
1,250
100
ON W KAMERLING AVE FROM N LONG AVE TO N PINE AVE
5.0
10/15/03
10/16/03
2,075 11/05/03
11/05/03
1,575
100
ON W ST PAUL AVE FROM N CICERO AVE TO N LAMON AVE
5.0
08/01/07
08/10/07
2,200 08/18/07
08/18/07
1,226
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 382
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0069 / 5233
ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE
17.0
5,825 04/15/02
04/17/02
6,375
100
300 06 0069 / 5233
ON W WABANSIA AVE FROM N CICERO AVE TO N LECLAIRE AVE
17.0
5,825 04/15/02
04/17/02
6,375
100
300 06 0069 / 5233
ON W WALTON ST FROM N LONG AVE TO N CENTRAL AVE
3.0
0 04/25/02
04/25/02
1,125
100
300 07 0037 / 5460
1100 N LATROBE AVE
5.0
04/18/06
11/18/06
2,200 01/05/07
01/05/07
0
100
300 06 0122 / 5275
1500 N LATROBE AVE
4.0
11/01/03
11/02/03
1,700 11/05/03
11/05/03
1,242
100
300 06 0069 / 5233
819 N LEAMINGTON AVE
3.0
12/15/03
12/15/03
1,125 02/10/04
02/10/04
581
100
300 06 0122 / 5275
1400 N LEAMINGTON AVE
11.0
05/10/03
05/12/03
4,900 05/01/03
05/01/03
3,122
100
300 11 / 32226
1600 N LINDER AVE
4.0
10/10/07
10/10/07
1,800 10/10/07
10/10/07
1,800
100
300 11 / 32226
1600-1700 N LINDER AVE
5.0
10/10/07
10/10/07
2,200 10/10/07
10/10/07
2,200
100
300 06 0069 / 5233
1800 N LINDER AVE
5.0
05/01/03
05/01/03
2,000 09/25/02
09/25/02
1,342
100
300 06 0069 / 5233
1800 N LONG AVE
5.0
09/28/02
09/28/02
2,000 09/25/02
09/25/02
1,342
100
302 00 0092 / 5774
2200 N LONG AVE
5.0
10/02/01
10/02/01
1,029 10/02/01
10/02/01
1,029
100
300 06 0069 / 5233
2340 N LOREL AVE
1.0
06/09/02
06/09/02
210 06/06/02
06/06/02
203
100
300 06 0069 / 5233
2350 N LOREL AVE
1.0
06/09/02
06/09/02
210 06/06/02
06/06/02
203
100
300 06 0069 / 5233
1800 N LOTUS AVE
5.0
09/28/02
09/28/02
2,000 09/25/02
09/25/02
1,342
100
302 00 0092 / 5774
4800-4899 W AUGUSTA BLVD
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4900-4999 W AUGUSTA BLVD
4.0
0 02/01/02
02/06/02
824
100
300 03 0037 / 4908
4300 W CORTEZ ST
5.0
2,075 05/14/04
05/14/04
1,167
100
302 00 0092 / 5774
4800-4899 W CORTEZ ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4900-4999 W CORTEZ ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4800-4899 W IOWA ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4900-4999 W IOWA ST
4.0
0 02/01/02
02/06/02
824
100
300 06 0069 / 5233
5500-5599 W IOWA ST
1.0
0 04/25/02
04/25/02
375
100
302 00 0092 / 5774
4800-4899 W RICE ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4900-4999 W RICE ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4800-4899 W THOMAS ST
3.0
0 02/01/02
02/06/02
618
100
302 00 0092 / 5774
4900-4999 W THOMAS ST
3.0
0 02/01/02
02/06/02
618
100
302 00 0092 / 5774
4800-4899 W WALTON ST
4.0
0 02/01/02
02/06/02
824
100
302 00 0092 / 5774
4900-4999 W WALTON ST
4.0
0 02/01/02
02/06/02
824
100
Totals per 250 Watt Changeout
380.0
05/20/04
05/21/04
112,979
98,318
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 383
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
38.50
04/04/05
11/18/05
15,400 07/10/05
08/01/05
13,475
100
300 03 0031 / 4902
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
91.50
05/18/04
05/25/04
36,600 05/15/04
06/01/04
34,037
100
300 07 0037 / 5460
ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE
97.0
04/18/06
11/18/06
38,800 12/04/06
01/22/07
38,800
100
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
227.0
90,800
86,312
Installations
300 06 0122 / 5275
ON N LOTUS AVE FROM W HURON ST TO W CHICAGO AVE
7.0
07/20/03
07/21/03
2,450 06/17/03
06/17/03
2,598
100
805 06 1146 / 7332
835 N KEELER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0345 / 6531
1141 N LARAMIE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2053 / 8239
2310 N LARAMIE AVE
1.0
01/11/96
01/11/96
0 01/11/96
01/11/96
300
100
805 06 0319 / 6505
1000 N LAWLER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0340 / 6526
1034 N LAWLER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0321 / 6507
1437 N LAWLER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0356 / 6542
1810 N LECLAIRE AVE
1.0
07/30/86
07/30/86
0 07/30/86
07/30/86
300
100
805 06 1753 / 7939
1746 N LINDER AVE
1.0
05/23/97
05/23/97
0 05/23/97
05/23/97
300
100
805 06 0338 / 6524
1534 N LONG AVE
1.0
06/19/96
06/19/96
0 06/19/96
06/19/96
300
100
805 06 1874 / 8060
1400 N LOREL AVE
1.0
05/30/96
05/30/96
0 05/30/96
05/30/96
300
100
805 06 1875 / 8061
1418 N LOREL AVE
1.0
05/06/96
05/06/96
0 05/06/96
05/06/96
300
100
805 06 1938 / 8124
4030 W CHICAGO AVE
1.0
03/14/97
03/14/97
0 03/14/97
03/14/97
300
100
805 06 1668 / 7854
4040 W CHICAGO AVE
1.0
07/17/97
07/17/97
0 07/17/97
07/17/97
300
100
805 06 1949 / 8135
4042 W CHICAGO AVE
1.0
01/31/97
01/31/97
0 01/31/97
01/31/97
300
100
805 06 0342 / 6528
4557 W NORTH AVE
1.0
10/06/95
10/06/95
0 10/06/95
10/06/95
300
100
300 06 0139 / 5289
5344 W NORTH AVE
1,233.0
03/01/06
09/01/06
30,017 06/01/06
06/19/06
37,254
100
302 00 0092 / 5774
5344 W NORTH AVE
28.0
0 01/09/01
01/13/02
6,598
100
805 06 0682 / 6868
5513 W NORTH AVE
1.0
03/28/95
03/28/95
0 03/28/95
03/28/95
300
100
805 06 1652 / 7838
5321 W POTOMAC AVE
1.0
07/29/97
07/29/97
0 07/29/97
07/29/97
300
100
805 06 1653 / 7839
5345 W POTOMAC AVE
1.0
07/29/97
07/29/97
0 07/29/97
07/29/97
300
100
805 06 0497 / 6683
4300 W WALTON ST
1.0
05/30/96
05/30/96
0 05/30/96
05/30/96
300
100
Totals per Alley Lighting/Lamps Totals per Lighting/Electrical
1,287.0
32,467
52,150
3,373,630
2,698,872
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 384
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
5344 W NORTH AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5344 W NORTH AVE
Work Type: Flood Light Install 302 00 0092 / 5774
5443 W HURON ST
Work Type: Lighting Imprvmnts 300 06 0303 / 5409
ON N KOSTNER AVE FROM W HIRSCH ST TO W NORTH AVE
300 06 0292 / 5399
4300 W DIVISION ST
Lamps 1,378.0
06/01/07
12/31/07
40,568 06/05/07
09/10/07
40,568
100
0 06/15/02
06/18/02
22,451
100
0 03/28/01
03/28/01
471
100
Installations 1,233.0
Fixtures 1.0
Installations 1.0
10/01/05
09/26/06
147,000 08/12/05
10/29/05
22,425
100
.0
03/01/05
12/31/05
0 03/01/05
12/31/05
0
0
Operations project Note Last Updated on 01-NOV-07 Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
1.0
147,000
22,425
Fixtures
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
31.0
04/04/05
11/18/05
41,850 07/10/05
07/15/05
26,500
100
300 03 0031 / 4902
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
77.0
05/26/04
06/10/04
103,950 05/25/04
07/07/04
81,642
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
5344 W NORTH AVE
108.0
145,800
108,142
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 385
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0037 / 5460
ON N KEYSTONE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
04/18/06
11/18/06
170,000 03/19/07
05/31/07
96,542
100
300 05 0037 / 5152
ON N LATROBE AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
04/04/05
11/18/05
170,000 09/07/05
11/18/05
126,305
100
300 09 / 33103
ON N LAVERGNE AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
130,000 04/01/08
12/01/08
0
0
300 06 0308 / 5414
ON N LEAMINGTON AVE FROM W DICKENS AVE TO W BELDEN AVE
1.0
08/25/06
10/25/06
84,842 09/05/06
04/27/07
20,179
100
300 11 / 32226
ON N LECLAIRE AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
11/30/07
03/14/08
120,000 11/28/07
05/02/08
107,104
100
300 05 0037 / 5152
ON N LINDER AVE FROM W HIRSCH ST TO W NORTH AVE
2.0
04/04/05
11/18/05
170,000 09/01/05
11/18/05
111,574
100
300 09 / 33094
ON N LOCKWOOD AVE FROM W CHICAGO AVE TO W OHIO ST
1.0
300 03 0037 / 4908
ON N LOCKWOOD AVE FROM W HIRSCH ST TO W LE MOYNE ST
2.0
300 09 / 33103
ON N LONG AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
2.0
300 11 / 32226
ON N LOREL AVE FROM W NORTH AVE TO W BLOOMINGDALE AVE
300 06 0298 / 5405 300 05 0037 / 5152 300 06 / 32277
ON W AUGUSTA BLVD FROM N CENTRAL AVE TO N LARAMIE AVE
300 05 0037 / 5152 300 11 / 32226
65,000 03/15/05
05/15/05
2.0
11/30/07
03/14/08
ON N PINE AVE FROM W OHIO ST TO W CHICAGO AVE
2.0
07/15/05
ON N PINE AVE FROM W OHIO ST TO W RACE AVE
2.0
04/04/05
.0
05/04/08
12/31/08
ON W CRYSTAL ST FROM N LONG AVE TO N CENTRAL AVE
2.0
04/04/05
11/18/05
170,000 09/19/05
ON W ST PAUL AVE FROM N CICERO AVE TO N LECLAIRE AVE
2.0
11/30/07
03/14/08
120,000 11/28/07
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0
0
118,337
100
165,000 03/14/05
06/10/05
130,000 04/01/08
12/01/08
0
0
120,000 11/28/07
05/02/08
107,104
100
09/15/05
0 08/15/05
10/14/05
128,727
100
11/18/05
85,000 08/15/05
10/14/05
91,671
100
26.0
0
0
0
11/11/05
124,547
100
05/02/08
107,104
100
1,699,842
1,139,194
Blocks
300 06 0252 / 5362
MC NAIR ACADEMIC CPS
2.0
08/01/03
08/29/03
79,580 07/10/03
09/02/03
87,933
100
300 06 0122 / 5275
ON N LAVERGNE AVE FROM W CHICAGO AVE TO W AUGUSTA BLVD
3.0
07/11/03
09/11/03
186,500 07/11/03
10/01/03
182,566
100
300 06 0232 / 5346
ON W CORTEZ ST FROM N CICERO AVE TO N LAVERGNE AVE
2.0
12/16/02
02/16/03
174,000 12/12/02
02/14/03
116,740
100
300 06 0267 / 5375
ON W IOWA ST FROM N CICERO AVE TO N LAMON AVE
2.0
05/18/04
07/18/04
147,333 05/03/04
09/16/04
148,699
100
300 03 0037 / 4908
ON W POTOMAC AVE FROM N CICERO AVE TO N LAVERGNE AVE
2.0
09/15/04
11/15/04
150,000 08/02/04
09/09/04
108,138
100
300 03 0037 / 4908
ON W POTOMAC AVE FROM N LONG AVE TO N CENTRAL AVE
2.0
10/15/04
12/15/04
150,000 11/18/04
03/18/05
101,249
100
300 06 0235 / 5349
ON W RICE ST FROM N CICERO AVE TO N LAVERGNE AVE
2.0
07/15/03
09/15/03
144,029 06/06/03
09/18/03
176,128
100
Totals per Residntl Strt Lighting/Lamps
15.0
1,031,442
921,453
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 386
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
1600 N LOCKWOOD AVE
1.0
0 04/12/01
04/12/01
378
100
302 00 0092 / 5774
800 N PINE AVE
1.0
0 04/12/01
04/12/01
378
100
302 00 0092 / 5774
5514 W CORTLAND ST
1.0
0 01/17/01
01/17/01
378
100
302 00 0092 / 5774
5547 W CORTLAND ST
1.0
0 01/17/01
01/17/01
378
100
4.0
0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
1,512
Locations
302 00 0076 / 5764
ON N LARAMIE AVE FROM W HIRSCH ST TO W LE MOYNE ST
14.0
09/01/00
12/31/00
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
31.0
04/04/05
11/18/05
302 00 0076 / 5764
ON N LAVERGNE AVE FROM W HIRSCH ST TO W LE MOYNE ST
9.0
09/01/00
12/31/00
0
153
302 00 0076 / 5764
ON N LAWLER AVE FROM W HIRSCH ST TO W LE MOYNE ST
9.0
09/01/00
12/31/00
0
153
302 00 0076 / 5764
ON N LEAMINGTON AVE FROM W HIRSCH ST TO W LE MOYNE ST
9.0
09/01/00
12/31/00
0
153
302 00 0076 / 5764
ON N LECLAIRE AVE FROM W HIRSCH ST TO W LE MOYNE ST
9.0
09/01/00
12/31/00
0
153
300 09 / 33096
ON N MONITOR AVE FROM W BELDEN AVE TO W ALTGELD ST
3.50
302 00 0076 / 5764
ON N PINE AVE FROM W DIVISION ST TO W POTOMAC AVE
300 03 0031 / 4902 302 00 0076 / 5764 300 07 0037 / 5460 302 00 0076 / 5764
0 7,750 06/27/05
238 07/15/05
700
6,324
100
0
0
5.0
07/20/98
07/20/98
0 07/20/98
07/20/98
85
100
ON W FULLERTON AVE FROM N LONG AVE TO N PULASKI RD
101.0
05/10/04
06/04/04
27,425 05/10/04
06/04/04
24,084
100
ON W GRAND AVE FROM W DIVISION ST TO N LOREL AVE
61.50
09/01/00
12/31/00
ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE
87.0
04/18/06
11/18/06
ON W NORTH AVE FROM N CICERO AVE TO N CENTRAL AVE
96.0
09/01/00
12/31/00
300 04 0216 / 5114
ON W NORTH AVE FROM N KILPATRICK AVE TO N CICERO AVE
22.0
05/01/06
11/01/06
302 00 0076 / 5764
ON W NORTH AVE FROM N RIDGEWAY AVE TO N KOSTNER AVE
4.05
09/01/00
12/31/00
302 00 0077 / 5765
737 N CENTRAL AVE
0 06/22/99
06/22/99
786
100
302 00 0076 / 5764
5300-5400 W CRYSTAL ST
11.0
07/20/98
07/20/98
0 07/20/98
07/20/98
187
100
302 00 0076 / 5764
5300-5400 W DIVISION ST
17.0
09/01/00
12/31/00
0
289
302 00 0076 / 5764
5100 W HIRSCH ST
9.0
09/01/00
12/31/00
0
153
302 00 0076 / 5764
5000-5100 W LE MOYNE ST
9.0
09/01/00
12/31/00
0
153
302 00 0076 / 5764
5000-5100 W NORTH AVE
24.0
09/01/00
12/31/00
0
408
302 00 0076 / 5764
5300-5400 W POTOMAC AVE
10.0
09/01/00
12/31/00
0
170
62,383
63,004
Totals per Strt Light Pole Painting
9.0
550.05
0 21,750 12/22/06
1,046 01/22/07
0 4,758 05/17/06
22,011
100
1,632 07/24/06
0
4,758
100
69
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 387
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping
Lamps
5344 W NORTH AVE
1,647.0
Work Type: Underpass Lighting
Fixtures
805 06 2112 / 8298
1813 N CICERO AVE
805 06 2463 / 8649
1930 N LARAMIE AVE
805 06 2663 / 8849
300 06 0238 / 5352
06/01/06
12/31/06
9,000 10/13/06
10/19/06
8,564
100
10.0
08/01/94
08/01/94
0 08/01/94
24.0
08/21/95
08/21/95
0 08/21/95
08/01/94
7,500
100
08/21/95
18,000
1895 N LECLAIRE AVE
10.0
12/14/94
12/14/94
100
0 12/14/94
12/14/94
7,500
805 06 2438 / 8624
1035 S KILDARE AVE
14.0
08/01/95
100
08/01/95
0 08/01/95
08/01/95
10,500
805 06 2319 / 8505
4601 W AUGUSTA BLVD
22.0
100
05/30/96
05/30/96
0 05/30/96
05/30/96
16,500
805 06 2287 / 8473
4533 W DIVISION ST
100
30.0
08/16/96
08/16/96
0 08/16/96
08/16/96
22,500
805 06 2288 / 8474
100
4533 W DIVISION ST
16.0
08/16/96
08/16/96
0 08/16/96
08/16/96
12,000
100
805 06 2256 / 8442
4601 W GRAND AVE
14.0
10/23/96
10/23/96
0 10/23/96
10/23/96
10,500
100
805 06 2822 / 9008
5600 W GRAND AVE
13.0
06/01/93
06/01/93
0 06/01/93
06/01/93
9,750
100
805 06 2376 / 8562
4575 W NORTH AVE
11.0
11/14/95
11/14/95
0 11/14/95
11/14/95
8,250
100
805 06 2377 / 8563
4575 W NORTH AVE
12.0
11/20/95
11/20/95
0 11/20/95
11/20/95
9,000
100
300 06 0217 / 5337
5344 W NORTH AVE
24.0
05/11/04
05/14/04
1,349 06/02/04
06/02/04
2,308
100
Totals per Underpass Lighting
200.0
1,349
134,308
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 388
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Locations
Work Type: LED Signal Head Install 210 06 0130 / 4389
1.0
N KEELER AVE AND W DIVISION ST
0 12/04/01
12/04/01
7,324
100
Locations
Work Type: Left Turn Arrow 210 06 0257 / 4493
N CENTRAL AVE AND W FULLERTON AVE
.50
09/15/06
08/20/07
58,700 01/17/07
04/17/07
0
100
210 06 0127 / 4386
No true cost avail. Pending jcs adjustment Note Last Updated on 04-OCT-07 Awaiting ADA work. Note Last Updated on 21-JUN-07 N CICERO AVE AND W DIVISION ST
1.0
10/15/06
11/15/06
110,000 05/09/06
08/17/06
97,222
100
210 06 0171 / 4420
N CICERO AVE AND W NORTH AVE
.0
03/01/07
12/31/07
210 06 / 32040
W DIVISION ST AND N LARAMIE AVE
1.0
11/01/06
12/31/07
85,000 08/08/07
210 06 0073 / 4337
waiting for cut over Note Last Updated on 17-JUN-08 800 N CICERO AVE
1.0
11/30/02
12/30/02
57,718 11/18/02
Totals per Left Turn Arrow
Work Type: New Signal
3.50
.50
Work Type: Removal Temp Wiring - Signals
Crossings
300 06 0197 / 5322
N KOLMAR AVE AND W AUGUSTA BLVD
Work Type: Signals 300 06 0096 / 5258
5344 W NORTH AVE
Work Type: TSM Install
01/15/03
311,418
0
0
75,422
99
53,170
100
225,814
Locations
N CENTRAL AVE AND W DIVISION ST
300 06 0283 / 5391
0
09/02/04
09/30/04
3.0
8,159 09/09/04
09/09/04
8,159
100
12,000 10/02/01
10/05/01
3,607
100
Intersections 41.0
11/12/03
11/20/03
0 10/31/03
11/06/03
6,483
100
Locations
814 06 0232 / 16444
800 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
92,500
100
814 06 0203 / 16415
1000 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
92,500
100
814 06 0204 / 16416
1200 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
92,500
100
814 06 0260 / 16472
1400 N CICERO AVE
1.0
08/17/89
08/17/89
0 08/17/89
08/17/89
140,000
100
814 06 0177 / 16389
1813 N CICERO AVE
1.0
09/21/94
09/21/94
0 09/21/94
09/21/94
120,000
100
800 N LAVERGNE AVE
1.0
09/07/93
09/07/93
0 09/07/93
09/07/93
89,812
100
814 06 0138 / 16352 Totals per TSM Install Totals per Traffic
6.0
0
627,312
346,377
889,200
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 389
1/1/2008 AND 12/31/2008
Ward 37 Emma Mitts CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 05 0031 / 5146
ON N LARAMIE AVE FROM W PALMER ST TO W BARRY AVE
13.0
04/04/05
11/18/05
4,850 06/27/05
07/15/05
2,652
100
300 07 0037 / 5460
ON W NORTH AVE FROM N CENTRAL AVE TO N CICERO AVE
31.0
04/18/06
11/18/06
9,950 12/22/06
01/22/07
7,849
100
44.0
14,800
10,501
Totals per Construction Phase
3,720,006
3,588,071
Totals for Ward 37
3,991,006
3,598,943
Totals per Traffic Equipment Painting
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 390
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32146
ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE
1.0
05/01/07
10/31/07
3,900 08/23/07
09/20/07
197
100
300 06 0274 / 5382
ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
3,567
100
300 06 0274 / 5382
ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
1,784
100
300 06 0274 / 5382
ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE
.0
07/01/04
12/31/04
0 03/22/05
05/06/05
3,567
100
300 06 0308 / 5414
ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,716
100
210 06 0208 / 4451
N AUSTIN AVE AND W GRACE ST
.0
07/01/04
10/01/04
0 03/09/04
05/13/05
6,457
100
210 06 0243 / 4480
W IRVING PARK RD AND N LONG AVE
.0
12/26/06
01/26/07
500 12/26/06
01/26/07
1,275
100
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
4,400
19,563
Totals per Design/Engineering
1.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 391
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Fixtures
Work Type: 250 Watt Changeout 300 11 / 32227
N CICERO AVE AND W PATTERSON AVE
0
0
300 06 0069 / 5233
4500 W PATTERSON AVE
10.0 4.0
06/07/02
06/07/02
4,200 840 06/04/02
06/04/02
812
100
300 06 0069 / 5233
4500 W WAVELAND AVE
4.0
06/07/02
06/07/02
840 06/04/02
06/04/02
812
100
18.0
Totals per 250 Watt Changeout
5,880
1,624
Fixtures
Work Type: 400 Watt Changeout 300 11 / 32227
ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE
34.0
10/01/07
12/15/07
14,200 09/12/07
09/24/07
12,940
100
300 11 / 32227
ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD
40.0
10/01/07
12/15/07
16,400 09/15/07
09/24/07
12,392
100
300 11 / 32227
ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE
80.0
10/01/07
12/15/07
32,600 09/21/07
09/25/07
23,908
100
300 09 / 33096
ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE
2.60
10/27/08
11/01/07
1,040 10/27/08
11/01/07
993
100
300 11 / 32227
ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE
25.0
10/01/07
12/01/07
10,600 09/15/07
09/25/07
8,478
100
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
181.60
74,840
58,711
Installations
805 06 1664 / 7850
3514 N CICERO AVE
1.0
08/15/97
08/15/97
0 08/15/97
08/15/97
300
100
805 06 2030 / 8216
4200 N KILDARE AVE
1.0
09/13/95
09/13/95
0 09/13/95
09/13/95
300
100
805 06 1853 / 8039
3705 N LOWELL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
302 00 0092 / 5774
4422 N MC VICKER AVE
1.0
0 12/04/01
12/04/01
236
100
805 06 1817 / 8003
4518 N MEADE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1921 / 8107
3920 N MOBILE AVE
1.0
06/06/96
06/06/96
0 06/06/96
06/06/96
300
100
805 06 1922 / 8108
3940 N MOBILE AVE
1.0
06/06/96
06/06/96
0 06/06/96
06/06/96
300
100
805 06 1975 / 8161
4419 N MONITOR AVE
1.0
08/02/96
08/02/96
0 08/02/96
08/02/96
300
100
805 06 1900 / 8086
4237 N NARRAGANSETT AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1792 / 7978
5741 W CORNELIA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1309 / 7495
6428 W DAKIN ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1111 / 7297
4648 W GRACE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1152 / 7338
6031 W GUNNISON ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
300 06 0139 / 5289
5817 W IRVING PARK RD
1,719.0
03/01/06
09/01/06
39,894 04/10/06
04/28/06
51,938
100
302 00 0092 / 5774
5817 W IRVING PARK RD
14.0
0 03/15/01
01/17/02
3,299
100
805 06 0543 / 6729
6235 W PATTERSON AVE
1.0
0 03/13/97
03/13/97
300
100
Totals per Alley Lighting/Lamps
1,747.0
03/13/97
03/13/97
39,894
59,373
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 392
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
5817 W IRVING PARK RD
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5817 W IRVING PARK RD
Work Type: Flood Light Install
Lamps 1,450.0
06/01/07
12/31/07
42,688 09/01/07
09/15/07
42,688
100
0 04/18/02
04/21/02
24,672
100
Installations 1,355.0
Fixtures
300 06 0071 / 5234
4100 N LONG AVE
117,500 03/01/98
06/17/98
38,457
100
302 00 0092 / 5774
4250 N MELVINA AVE
2.0
0 02/16/01
02/16/01
941
100
302 00 0092 / 5774
5700 W BERTEAU AVE
2.0
0 09/21/01
09/21/01
689
100
302 00 0092 / 5774
5815 W IRVING PARK RD
1.0
0 09/21/01
09/21/01
404
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
02/01/98
06/30/98
5.0
117,500
40,491
Blocks
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts
.0
Installations
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Lighting Imprvmnts
Work Type: Loop Lighting
.0
Blocks
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
Totals per Loop Lighting Totals per Lighting/Electrical
.0
0
0
1,520,392
2,708,841
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 393
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 11 / 32227
ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE
30.0
10/01/07
12/15/07
40,500 10/10/07
10/10/07
34,200
100
300 11 / 32227
ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD
32.0
10/01/07
12/15/07
43,200 10/10/07
10/10/07
36,640
100
300 11 / 32227
ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE
53.0
10/01/07
12/15/07
71,550 10/10/07
10/10/07
60,685
100
300 09 / 33096
ON W BELMONT AVE FROM N LAVERGNE AVE TO N LONG AVE
5.07
12/22/08
01/16/09
6,845 12/22/08
01/16/09
6,895
100
300 11 / 32227
ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE
42.0
10/01/07
12/01/07
56,700 10/10/07
10/10/07
48,090
100
Totals per Ornamental - Piggyback Lighting
162.07
218,795
186,510
Work Type: Ornamental Lighting
Blocks
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
Totals per Ornamental Lighting
Work Type: POD Camera Pole
.0
Poles
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
0
0
Totals per POD Camera Pole
Work Type: Residential Regrouping 300 06 0270 / 5378
5817 W IRVING PARK RD
Work Type: Residntl Staggered Lighting
.0
Lamps .0
03/01/08
12/01/08
Blocks
300 06 / 32146
ON N MELVINA AVE FROM W IRVING PARK RD TO W MONTROSE AVE
4.0
12/05/07
03/02/08
295,049 12/28/07
300 06 0298 / 5405
ON N NEW ENGLAND AVE FROM W BYRON ST TO W GRACE ST
1.0
09/01/05
10/15/05
0 08/15/05
10/03/05
300 06 0298 / 5405
ON N NEWLAND AVE FROM W BYRON ST TO W GRACE ST
1.0
09/01/05
10/15/05
0 08/15/05
300 06 0308 / 5414
ON W PATTERSON AVE FROM N CICERO AVE TO N LAVERGNE AVE
2.0
04/01/06
06/01/06
235,932 03/27/06
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0
8.0
0
50
66,215
100
10/03/05
66,215
100
05/24/06
155,625
100
530,981
288,055
Blocks
300 06 0267 / 5375
ON N KOSTNER AVE FROM W IRVING PARK RD TO W BERTEAU AVE
2.0
06/28/04
08/12/04
129,596 06/18/04
08/04/04
137,213
100
300 06 0235 / 5349
ON N MENARD AVE FROM W GRACE ST TO W IRVING PARK RD
2.0
06/01/03
08/01/03
122,608 05/21/03
07/31/03
117,302
100
Totals per Residntl Strt Lighting/Lamps
4.0
252,204
254,515
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 394
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Arterial
Locations
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
.0
Totals per Short Arm Installs - Arterial
Work Type: Short Arm Installs - Residntl
Locations
281 00 / 33670
3927 N CENTRAL AVE
.0
01/01/08
12/31/08
0
0
0
281 00 / 33670
6008 W GIDDINGS ST
.0
01/01/08
12/31/08
0
0
0
0
0
.0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
Locations
300 11 / 32227
ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE
30.0
06/15/07
07/10/07
302 00 0076 / 5764
ON N MILWAUKEE AVE FROM W BELMONT AVE TO N CICERO AVE
38.0
09/01/00
12/31/00
300 11 / 32227
ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD
32.0
06/15/07
07/08/07
7,040 06/15/07
07/08/07
7,040
100
300 11 / 32227
ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE
53.0
06/15/07
07/10/07
11,660 06/15/07
07/10/07
11,660
100
300 04 0216 / 5114
ON W ADDISON ST FROM N LARAMIE AVE TO N CICERO AVE
32.0
05/01/06
11/01/06
6,705 05/17/06
07/09/06
6,705
100
300 09 / 33096
ON W BELMONT AVE FROM N LONG AVE TO N LAVERGNE AVE
4.55
10/27/08
10/31/08
1,365 10/27/08
10/31/08
1,174
100
300 11 / 32227
ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE
42.0
07/10/07
08/01/07
9,240 07/10/07
08/01/07
9,240
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
3927 N CENTRAL AVE
300 06 0098 / 5259
3900-5100 N PULASKI RD
281 00 / 33670
6008 W GIDDINGS ST
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Strt Lighting
231.55
6,600 06/15/07
07/10/07
0
6,600
100
646
42,610
43,065
Blocks .0
01/01/08
12/31/08
0
12.0
04/01/01
02/28/03
0 04/18/01
.0
01/01/08
12/31/08
12.0
0
0
1,238,325
100
0
0
0
0
1,238,325
02/11/03
Blocks
300 06 0274 / 5382
ON N MENARD AVE FROM W EASTWOOD AVE TO W WILSON AVE
.50
11/01/05
05/15/06
35,000 11/01/05
05/15/06
61,256
100
300 06 0274 / 5382
ON W ADDISON ST FROM N MILWAUKEE AVE TO N KILBOURN AVE
1.0
06/20/06
08/31/06
75,000 06/20/06
08/31/06
30,628
100
300 06 0274 / 5382
ON W CULLOM AVE FROM N MENARD AVE TO N MAJOR AVE
1.0
11/01/05
05/15/06
75,000 11/01/05
05/15/06
61,256
100
Totals per Strt Lighting
2.50
185,000
153,140
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 395
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
5817 W IRVING PARK RD
Lamps 1,847.0
06/01/06
12/31/06
10,000 11/16/06
11/21/06
9,604
100
Work Type: Underpass Lighting
Fixtures
302 00 0072 / 5760
4000 N KEELER AVE
1.0
0 07/16/99
11/04/99
49,326
100
805 06 2263 / 8449
4010 N KEELER AVE
8.0
08/14/96
08/14/96
0 08/14/96
08/14/96
6,000
100
805 06 2423 / 8609
4212 N KOSTNER AVE
8.0
09/06/95
09/06/95
0 09/06/95
09/06/95
6,000
100
302 00 0072 / 5760
4220 N KOSTNER AVE
1.0
0 07/02/99
08/03/99
37,841
100
805 06 2910 / 9096
3750 N MILWAUKEE AVE
10.0
07/29/94
07/29/94
0 07/29/94
07/29/94
7,500
100
805 06 2911 / 9097
3820 N MILWAUKEE AVE
6.0
07/29/94
07/29/94
0 07/29/94
07/29/94
4,500
100
302 00 0072 / 5760
3900 N PULASKI RD
1.0
0 07/01/99
08/20/99
45,260
100
302 00 0071 / 5759
4440 W ADDISON ST
0 10/13/98
10/19/98
9,795
100
805 06 2662 / 8848
4560 W ADDISON ST
0 04/16/92
04/16/92
3,000
100
302 00 0071 / 5759
4600 W ADDISON ST
0 09/25/98
10/02/98
9,096
100
805 06 2261 / 8447
4198 W IRVING PARK RD
14.0
12/09/96
12/09/96
0 12/09/96
12/09/96
10,500
100
805 06 2912 / 9098
4533 W IRVING PARK RD
13.0
07/09/93
07/09/93
0 07/09/93
07/09/93
9,750
100
805 06 2260 / 8446
4540 W IRVING PARK RD
146.0
12/13/96
12/13/96
0 12/13/96
12/13/96
109,500
100
Totals per Underpass Lighting
4.0
212.0
04/16/92
04/16/92
0
308,068
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 396
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N LAVERGNE AVE AND W ADDISON ST
1.0
0 11/22/02
11/22/02
7,324
100
210 06 0130 / 4389
N LONG AVE AND W ADDISON ST
1.0
0 10/24/01
10/24/01
8,539
100
210 06 0130 / 4389
N MELVINA AVE AND W IRVING PARK RD
1.0
0 01/29/02
01/29/02
7,324
100
210 06 0130 / 4389
N MENARD AVE AND W IRVING PARK RD
1.0
0 01/30/02
01/30/02
7,324
100
4.0
0
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
30,511
Locations
210 06 0231 / 4470
W ADDISON ST AND N CENTRAL AVE
300 05 0036 / 5151
W ADDISON ST AND N OAK PARK AVE
.50
210 06 0256 / 4492
W BELMONT AVE AND N CENTRAL AVE
.50
09/01/05
06/30/07
61,036 01/02/07
10/19/07
300 11 / 32227
Awaiting ADA work. Note Last Updated on 21-JUN-07 W IRVING PARK RD AND N KEELER AVE
1.0
02/11/08
06/15/08
44,000 02/21/08
210 06 / 32040
W IRVING PARK RD AND N OAK PARK AVE
1.0
11/01/06
12/31/07
85,000 01/16/08
300 06 0199 / 5324
W MONTROSE AVE AND N LARAMIE AVE
.50
11/01/01
11/28/01
3,078 11/07/01
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0208 / 4451
N AUSTIN AVE AND W GRACE ST
210 06 0075 / 4339
W MONTROSE AVE AND N KNOX AVE
.0
03/01/08
12/01/08
Work Type: Pedestrian Countdown Signal Install
3.50
1.0
03/21/08
46,182
100
06/04/08
124,243
100
11/08/01
4,980
100
208,940
09/15/04
200,000 07/06/04
09/02/04
155,090
100
09/01/04
11/01/04
90,500 07/26/04
07/07/05
114,304
100
290,500
269,394
Locations .0
05/04/08
12/31/08
10,500
W IRVING PARK RD AND N LONG AVE
.0
03/15/06
05/08/07
12,000 12/29/06
W BERTEAU AVE AND N NARRAGANSETT AVE
100
07/15/04
210 06 0243 / 4480
210 06 0240 / 4477
0
Locations
N AUSTIN AVE AND W IRVING PARK RD
Work Type: Pedestrian Crosswalk Signals
0 100
359,045
210 06 / 32280
Totals per Pedestrian Countdown Signal Install
0 33,535
40,250 04/06/06
1.0
Totals per New Signal
125,682
.0
22,500
02/09/07
0
0
8,248
100
8,248
Locations .0
11/01/05
08/30/07
27,760 11/01/05
23,122
Actual division doing this job wo#1061320 is construction. This is not an Operations job. Note Last Updated on 29-JAN-08 Target Construction Completion Date set for 6/15/07. Note Last Updated on 30-MAY-07 Totals per Traffic
1,256,055
2,177,739
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 397
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Signal Realignment 300 06 0199 / 5324
W IRVING PARK RD AND N NEENAH AVE
Work Type: Signals 300 06 0096 / 5258
5817 W IRVING PARK RD
Work Type: TSM Install
Intersections 1.0
05/01/01
12/01/01
11,400 03/23/01
03/30/01
13,641
100
11/01/03
11/07/03
0 10/10/03
10/17/03
4,744
100
Intersections 30.0
Locations
210 06 0072 / 4336
W GRACE ST AND N LARAMIE AVE
.50
02/12/01
04/12/01
75,000 02/01/01
04/02/01
72,768
100
814 06 0317 / 16525
3800 N CENTRAL AVE
1.0
09/01/97
09/01/97
0 09/01/97
12/23/97
200,000
100
210 06 0074 / 4338
4500 N CENTRAL AVE
1.0
02/01/03
04/01/03
141,000 12/24/02
02/10/03
155,005
100
814 06 0073 / 16289
3300 N CICERO AVE
1.0
02/14/96
02/14/96
0 02/14/96
02/14/96
107,451
100
814 06 0230 / 16442
3400 N CICERO AVE
1.0
08/21/90
08/21/90
0 08/21/90
08/21/90
37,173
100
814 06 0229 / 16441
3600 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
37,173
100
814 06 0268 / 16480
4000 N KEELER AVE
1.0
03/11/92
03/11/92
0 03/11/92
03/11/92
80,424
100
814 06 0117 / 16332
4023 N KEELER AVE
1.0
11/03/93
11/03/93
0 11/03/93
11/03/93
95,365
100
814 06 0082 / 16298
4100 N KEELER AVE
1.0
10/25/94
10/25/94
0 10/25/94
10/25/94
50,417
100
814 06 0350 / 16548
4400 N KEELER AVE
1.0
08/27/91
08/27/91
0 08/27/91
08/27/91
73,893
100
814 06 0358 / 16553
4000 N KILDARE AVE
1.0
11/25/91
11/25/91
0 11/25/91
11/25/91
73,893
100
210 06 0072 / 4336
3600 N MELVINA AVE
1.0
03/01/01
05/01/01
150,000 03/13/01
04/16/01
118,009
100
210 06 0072 / 4336
3800 N MILWAUKEE AVE
1.0
12/31/01
04/15/02
150,000
3,528
100
814 06 0054 / 16271
4000 N NARRAGANSETT AVE
1.0
11/15/95
11/15/95
0 11/15/95
11/15/95
8,586
100
814 06 0098 / 16314
4000 N NARRAGANSETT AVE
1.0
03/25/93
03/25/93
0 03/25/93
03/25/93
44,179
100
814 06 0180 / 16392
4199 N NARRAGANSETT AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
200,000
100
814 06 0261 / 16473
3999 N NATCHEZ AVE
1.0
08/08/90
08/08/90
0 08/08/90
08/08/90
110,172
100
814 06 0216 / 16428
4141 W IRVING PARK RD
1.0
12/22/95
12/22/95
0 12/22/95
12/22/95
125,000
100
300 06 0078 / 5241
6532 W IRVING PARK RD
1.0
04/01/98
12/01/98
5,000 05/18/98
05/19/98
2,254
100
Totals per TSM Install
18.50
521,000
1,595,290
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 398
1/1/2008 AND 12/31/2008
Ward 38 Thomas R. Allen CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 11 / 32227
ON N AUSTIN AVE FROM W IRVING PARK RD TO W MONTROSE AVE
13.0
06/15/07
07/10/07
4,450 06/15/07
07/10/07
4,450
100
300 11 / 32227
ON N NARRAGANSETT AVE FROM W ADDISON ST TO W IRVING PARK RD
16.0
06/15/07
07/08/07
5,700 06/15/07
07/08/07
5,700
100
300 11 / 32227
ON W ADDISON ST FROM N LARAMIE AVE TO N AUSTIN AVE
26.0
06/15/07
07/16/07
9,600 06/15/07
07/16/07
9,600
100
300 11 / 32227
ON W MONTROSE AVE FROM N AUSTIN AVE TO N NARRAGANSETT AVE
12.0
07/10/07
08/01/07
4,100 07/10/07
08/01/07
4,100
100
Totals per Traffic Equipment Painting
67.0
23,850
23,850
Totals per Construction Phase
2,776,447
4,886,580
Totals for Ward 38
2,780,847
4,906,143
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 399
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE
4.0
04/01/08
08/30/08
260,000 04/14/08
05/09/08
0
100
300 06 / 32275
ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST
.0
03/01/07
10/31/07
3,900 01/30/07
02/27/07
2,366
100
300 06 0308 / 5414
ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,562
100
210 06 0127 / 4386
N CICERO AVE AND W LAWRENCE AVE
.0
12/15/05
03/15/06
0
0
0
210 06 0158 / 5058
W IRVING PARK RD AND N PULASKI RD
.0
10/01/07
12/31/07
0
0
0
210 06 0158 / 5058
Needs Requirements Note Last Updated on 16-MAR-07 W LAWRENCE AVE AND N KIMBALL AVE
210 06 0209 / 4452
W LAWRENCE AVE AND N PULASKI RD
210 06 0158 / 5058
W PETERSON AVE AND N KIMBALL AVE
Totals per Design/Engineering
.0
08/15/05
12/31/05
0 08/15/05
12/31/05
235
100
1.0
07/01/04
12/31/04
0 07/01/04
12/31/04
4,044
100
.0
08/15/05
12/31/05
0 08/15/05
12/31/05
235
100
5.0
263,900
9,441
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 400
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0122 / 5275
ON N HAMLIN AVE FROM W GRACE ST TO W BYRON ST
300 06 0122 / 5275
ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
300 06 0122 / 5275
ON N KOLMAR AVE FROM N ELSTON AVE TO W CARMEN AVE
300 06 0122 / 5275
ON N LAWNDALE AVE FROM W IRVING PARK RD TO W LAWRENCE AVE
300 06 0122 / 5275
ON W AINSLIE ST FROM N PULASKI RD TO N KIMBALL AVE
300 06 0122 / 5275
ON W LAWRENCE AVE FROM N KIMBALL AVE TO N KEDZIE AVE
300 05 0039 / 5154
3800 N HAMLIN AVE
.0
300 06 0069 / 5233
4632 N KARLOV AVE
1.0
06/30/02
06/30/02
300 06 0069 / 5233
4843 N ST LOUIS AVE
1.0
06/17/02
06/17/02
300 05 0039 / 5154
3400-4000 W AINSLIE ST
302 00 0092 / 5774
3722 W WINDSOR AVE
1.0
0 11/14/01
302 00 0092 / 5774
3734 W WINDSOR AVE
1.0
302 00 0092 / 5774
3748 W WINDSOR AVE
1.0
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
5.0
11/01/03
11/02/03
2,200 03/01/05
03/02/05
1,232
100
14.50
08/01/03
09/01/03
5,688 07/01/03
07/28/03
3,119
100
9.0
12/21/04
12/22/04
3,800 03/01/05
03/02/05
2,214
100
87.50
08/01/03
09/01/03
34,219 07/01/03
07/28/03
19,610
100
16.0
12/21/04
12/22/04
6,600 03/01/05
03/02/05
3,937
100
323.0
11/10/03
11/30/03
127,500 10/30/03
11/28/03
77,597
100
2,956
460.0
0
210 06/27/02
06/27/02
203
100
210 06/14/02
06/14/02
203
100
2,956
.0
0
0
0
11/14/01
206
100
0 11/14/01
11/14/01
206
100
0 11/14/01
11/14/01
206
100
186,339
108,732
Fixtures
300 03 0040 / 4911
ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE
7.50
07/30/04
08/30/04
3,000 07/14/04
08/10/04
1,961
100
300 03 0040 / 4911
ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE
5.07
08/20/04
09/20/04
2,028 07/14/04
08/10/04
1,325
100
300 03 0040 / 4911
ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
2.50
08/20/04
09/20/04
1,000 07/14/04
08/10/04
654
100
300 03 0039 / 4910
ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE
7.0
10/01/04
10/05/04
3,075 10/01/04
10/01/04
1,036
100
300 03 0050 / 4921
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
20.16
10/01/04
10/20/04
8,064 08/27/04
09/06/04
5,615
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
42.23
17,167
10,590
2,400,297
2,307,186
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 401
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1539 / 7725
4339 N AVERS AVE
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 0873 / 7059
4832 N BERNARD ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2087 / 8273
4825 N CENTRAL PARK AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2074 / 8260
4832 N CENTRAL PARK AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0423 / 6609
4833 N CHRISTIANA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0461 / 6647
4901 N CHRISTIANA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0389 / 6575
6215 N CICERO AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0370 / 6556
6224 N CICERO AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0351 / 6537
6323 N CICERO AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1187 / 7373
4834 N DRAKE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0952 / 7138
4137 N ELSTON AVE
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
805 06 1206 / 7392
4409 N ELSTON AVE
1.0
08/28/96
08/28/96
0 08/28/96
08/28/96
300
100
805 06 1669 / 7855
4920 N HAMLIN AVE
1.0
07/17/97
07/17/97
0 07/17/97
07/17/97
300
100
805 06 1211 / 7397
5745 N JERSEY AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 1439 / 7625
5749 N JERSEY AVE
1.0
10/25/96
10/25/96
0 10/25/96
10/25/96
300
100
805 06 1670 / 7856
4136 N KEDVALE AVE
1.0
07/18/97
07/18/97
0 07/18/97
07/18/97
300
100
805 06 1477 / 7663
5138 N KEELER AVE
1.0
11/20/97
11/20/97
0 11/20/97
11/20/97
300
100
805 06 1185 / 7371
4035 N KEYSTONE AVE
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 0590 / 6776
4240 N KEYSTONE AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 0305 / 6491
4250 N KEYSTONE AVE
1.0
03/27/95
03/27/95
0 03/27/95
03/27/95
300
100
805 06 2026 / 8212
5145 N KILBOURN AVE
1.0
05/07/96
05/07/96
0 05/07/96
05/07/96
300
100
805 06 2042 / 8228
4831 N KIMBALL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2033 / 8219
4905 N KIMBALL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1987 / 8173
5807 N KOLMAR AVE
1.0
10/08/96
10/08/96
0 10/08/96
10/08/96
300
100
805 06 1999 / 8185
5901 N KOSTNER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2000 / 8186
4856 N KRUGER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1540 / 7726
6128 N PULASKI RD
1.0
10/22/97
10/22/97
0 10/22/97
10/22/97
300
100
805 06 0637 / 6823
6063 N SAUGANASH AVE
1.0
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
805 06 0626 / 6812
4837 N SAWYER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0659 / 6845
4818 N SPAULDING AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1681 / 7867
5235 N SPAULDING AVE
1.0
06/24/97
06/24/97
0 06/24/97
06/24/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 402
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0523 / 6709
4120 N SPRINGFIELD AVE
1.0
05/24/95
05/24/95
0 05/24/95
05/24/95
300
100
805 06 0433 / 6619
4318 N SPRINGFIELD AVE
1.0
07/17/96
07/17/96
0 07/17/96
07/17/96
300
100
805 06 0406 / 6592
4927 N SPRINGFIELD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0420 / 6606
4945 N ST LOUIS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0391 / 6577
4952 N ST LOUIS AVE
1.0
06/25/96
06/25/96
0 06/25/96
06/25/96
300
100
805 06 0392 / 6578
5202 N ST LOUIS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0421 / 6607
5722 N ST LOUIS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0359 / 6545
3212 W LAWRENCE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
300 06 0139 / 5289
4404 W LAWRENCE AVE
1,686.0
03/01/06
09/01/06
39,180 04/17/06
05/01/06
50,941
100
805 06 0357 / 6543
4630 W LAWRENCE AVE
1.0
03/21/97
03/21/97
0 03/21/97
03/21/97
300
100
805 06 1688 / 7874
3717 W WILSON AVE
1.0
07/01/97
07/01/97
0 07/01/97
07/01/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
4404 W LAWRENCE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4404 W LAWRENCE AVE
Work Type: Lighting Imprvmnts 300 06 0228 / 5343
ON W FOSTER AVE FROM N KEDZIE AVE TO N KIMBALL AVE
Work Type: Lighting Imprvmnts 300 06 0199 / 5324
W PETERSON AVE AND N KOSTNER AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
4404 W LAWRENCE AVE
1,727.0
39,180
63,241
Lamps 1,428.0
06/01/07
12/31/07
42,040 09/01/07
09/15/07
42,040
100
0 04/07/02
04/10/02
24,271
100
45,000 04/16/02
04/29/02
44,952
100
18,400 11/26/01
01/24/02
16,247
100
0
0
Installations 1,333.0
Blocks 2.0
07/01/02
08/30/02
Projects 1.0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 403
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 07 0039 / 5462
ON N KEDVALE AVE FROM W ARGYLE ST TO W CARMEN AVE
1.0
07/10/06
08/25/06
65,000 09/05/06
11/27/06
64,578
100
300 06 0298 / 5405
ON N KEDVALE AVE FROM W LAWRENCE AVE TO W ARGYLE ST
2.0
07/01/05
08/10/05
0 07/01/05
08/19/05
95,592
100
300 06 / 32277
ON N KEELER AVE FROM W LAWRENCE AVE TO W FOSTER AVE
.0
05/04/08
12/31/08
0
300 07 0039 / 5462
ON N KENNETH AVE FROM W LAWRENCE AVE TO W FOSTER AVE
4.0
06/30/06
09/29/06
300,000 07/20/06
300 06 / 32275
ON N KEYSTONE AVE FROM W LAWRENCE AVE TO W ARGYLE ST
2.0
04/01/07
12/31/07
210,094 03/28/07
300 05 0039 / 5154
ON N KILBOURN AVE FROM N ELSTON AVE TO W FOSTER AVE
300 09 / 33105
ON N KILDARE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
300 05 0039 / 5154
ON N KILPATRICK AVE FROM N ELSTON AVE TO W LAWRENCE AVE
.0
09/15/06
11/14/06
51,661
300 07 0039 / 5462
ON N KILPATRICK AVE FROM W LAWRENCE AVE TO N ELSTON AVE
1.0
04/18/06
11/18/06
33,339 12/12/06
300 05 0039 / 5154
ON N KOLMAR AVE FROM W CARMEN AVE TO N ELSTON AVE
300 07 0039 / 5462
ON N KOSTNER AVE FROM W LAWRENCE AVE TO W FOSTER AVE
4.0
06/30/06
09/29/06
300 07 0039 / 5462
ON N TRIPP AVE FROM W ARGYLE ST TO W LAWRENCE AVE
2.0
06/15/06
300 06 0308 / 5414
ON N TRIPP AVE FROM W FOSTER AVE TO W ARGYLE ST
2.0
03/16/06
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
0
0
11/10/06
229,668
100
07/13/07
122,730
100
0
0
0
0
139,606
.0
200,000 04/01/08
4.0
12/01/08
0
0
05/18/07
0
100
0
0
300,000 07/20/06
11/10/06
229,668
100
08/18/06
140,000 07/06/06
09/06/06
109,105
100
12/31/06
118,306 07/06/06
09/06/06
118,197
100
20,347
.0
22.0
1,578,353
969,538
Blocks
300 06 0235 / 5349
ON N BERNARD ST FROM W FOSTER AVE TO W BERWYN AVE
2.0
05/15/03
07/15/03
150,943 05/05/03
06/06/03
133,764
100
300 06 0267 / 5375
ON N KOLMAR AVE FROM W CARMEN AVE TO W FOSTER AVE
1.0
07/15/04
09/15/04
69,244 06/23/04
08/16/04
62,432
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
4246 N LAWNDALE AVE
3.0
220,187
196,196
Locations 1.0
0 03/01/01
03/01/01
378
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 404
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 09 / 33105
ON N CHRISTIANA AVE FROM W LAWRENCE AVE TO W ARGYLE ST
7.0
09/03/08
09/19/08
1,400 09/03/08
09/19/08
840
100
300 03 0040 / 4911
ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE
7.50
05/10/04
09/10/04
1,875 05/10/04
08/01/04
2,025
100
300 03 0040 / 4911
ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE
7.54
05/10/04
09/10/04
2,262 05/10/04
08/01/04
2,036
100
300 09 / 33105
ON N KEDZIE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
13.0
09/10/08
09/24/08
3,900 09/10/08
09/24/08
2,730
100
300 03 0040 / 4911
ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
4.0
05/10/04
09/10/04
1,450 05/10/04
08/01/04
1,080
100
300 09 / 33105
ON N SAWYER AVE FROM W LAWRENCE AVE TO W CARMEN AVE
13.0
09/03/08
09/19/08
2,600 09/03/08
09/19/08
1,560
100
300 09 / 33105
ON N SPAULDING AVE FROM W LAWRENCE AVE TO W CARMEN AVE
16.0
09/03/08
09/19/08
3,200 09/03/08
09/19/08
1,920
100
300 09 / 33105
ON W AINSLIE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE
3.0
12/03/08
12/04/08
390 12/03/08
12/04/08
378
100
300 09 / 33105
ON W ARGYLE ST FROM N CENTRAL PARK AVE TO N KEDZIE AVE
5.0
12/03/08
12/04/08
650 12/03/08
12/04/08
630
100
300 03 0039 / 4910
ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE
7.0
08/27/04
09/03/04
1,750 07/01/04
07/10/04
1,731
100
300 09 / 33105
ON W CARMEN AVE FROM N KEDZIE AVE TO N SPAULDING AVE
2.0
12/03/08
12/04/08
260 12/03/08
12/04/08
252
100
302 00 0076 / 5764
ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD
70.50
04/11/98
04/17/98
0 04/11/98
04/17/98
1,199
100
300 04 0216 / 5114
ON W PETERSON AVE FROM N KOSTNER AVE TO N PULASKI RD
49.0
05/01/06
11/01/06
10,526 05/17/06
08/15/06
10,526
100
300 03 0050 / 4921
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
21.63
10/01/04
10/20/04
6,122 07/10/04
08/27/04
6,041
100
300 06 0058 / 5229
ON W THORNDALE AVE FROM N ROGERS AVE TO N KILBOURN AVE
8.0
10/20/02
10/23/02
1,120 10/29/02
10/30/02
1,120
100
302 00 0076 / 5764
4000-4800 W LAWRENCE AVE
25.0
09/01/00
12/31/00
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0098 / 5259
ON N PULASKI RD FROM W FOSTER AVE TO W BRYN MAWR AVE
300 06 0098 / 5259
ON N PULASKI RD FROM W PETERSON AVE TO W BRYN MAWR AVE
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
4404 W LAWRENCE AVE
259.17
0
425
37,505
34,492
Blocks 4.0
04/01/01
02/28/03
0 05/11/01
02/11/03
85,928
100
04/01/01
02/28/03
0 05/11/01
02/11/03
412,775
100
4.0
0
498,703
Lamps 1,364.0
06/01/06
12/31/06
10,000 11/14/06
11/21/06
9,093
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 405
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0230 / 5344
N OB KENNEDY EXPY AND W IRVING PARK RD
86.0
45,000 10/29/02
02/21/03
53,456
100
300 06 0231 / 5345
W IRVING PARK RD AND N PULASKI RD
93.0
55,000 10/07/02
01/07/03
84,822
100
805 06 2734 / 8920
4989 N ELSTON AVE
14.0
07/20/94
07/20/94
0 07/20/94
07/20/94
10,500
100
805 06 2364 / 8550
5805 N ROGERS AVE
12.0
09/27/95
09/27/95
0 09/27/95
09/27/95
9,000
100
805 06 2735 / 8921
4600 W FOSTER AVE
14.0
05/04/94
05/04/94
0 05/04/94
05/04/94
10,500
100
300 06 0217 / 5337
4404 W LAWRENCE AVE
109.0
05/17/04
05/21/04
6,127 06/03/04
06/07/04
7,926
100
805 06 2681 / 8867
4031 W PETERSON AVE
10.0
04/23/92
04/23/92
0 04/23/92
04/23/92
7,500
100
302 00 0072 / 5760
4120 W PETERSON AVE
1.0
0 02/07/00
02/16/00
10,631
100
302 00 0072 / 5760
4320 W PETERSON AVE
1.0
0 02/17/00
02/28/00
12,200
100
805 06 2365 / 8551
4399 W PETERSON AVE
8.0
0 04/27/92
04/27/92
6,000
100
Totals per Underpass Lighting
Work Type: Underpass Lighting
04/27/92
04/27/92
348.0
106,127
212,535
Locations
300 06 0230 / 5344
N OB KENNEDY EXPY AND W IRVING PARK RD
1.0
10/07/02
10/31/02
45,000 09/24/02
12/04/02
38,089
100
300 06 0231 / 5345
W IRVING PARK RD AND N PULASKI RD
1.0
10/01/02
10/31/02
55,000 09/24/02
10/23/02
38,089
100
Totals per Underpass Lighting
2.0
100,000
76,178
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 406
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N KEDZIE AVE AND W ARGYLE ST
.50
0 08/26/02
08/26/02
925
100
210 06 0130 / 4389
N PULASKI RD AND N ELSTON AVE
1.0
0 11/26/02
11/26/02
8,539
100
210 06 0130 / 4389
N PULASKI RD AND W BERTEAU AVE
1.0
0 11/26/02
11/26/02
7,324
100
210 06 0130 / 4389
N PULASKI RD AND W BRYN MAWR AVE
1.0
0 12/09/02
12/09/02
10,884
100
210 06 0130 / 4389
N PULASKI RD AND W FOSTER AVE
1.0
0 12/09/02
12/09/02
5,298
100
210 06 0130 / 4389
N PULASKI RD AND W IRVING PARK RD
1.0
0 11/26/02
11/26/02
10,841
100
210 06 0130 / 4389
N PULASKI RD AND W LAWRENCE AVE
1.0
0 12/06/02
12/06/02
8,539
100
210 06 0130 / 4389
N PULASKI RD AND W MONTROSE AVE
1.0
0 11/26/02
11/26/02
8,539
100
210 06 0130 / 4389
N PULASKI RD AND W PETERSON AVE
1.0
0 12/09/02
12/09/02
12,418
100
210 06 0130 / 4389
W DAKIN ST AND N PULASKI RD
1.0
0 11/26/02
11/26/02
6,108
100
9.50
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
0
79,415
Locations
210 06 0127 / 4386
N CICERO AVE AND W LAWRENCE AVE
.50
47,500
0
0
210 06 / 32157
N KEDZIE AVE AND W LAWRENCE AVE
.0
11/01/08
02/28/09
51,000
0
0
210 06 0158 / 5058
Awaiting for a responce from obm Note Last Updated on 04-OCT-07 W IRVING PARK RD AND N PULASKI RD
1.0
02/18/07
12/31/07
60,000
210 06 0158 / 5058
W LAWRENCE AVE AND N KIMBALL AVE
.50
06/22/06
12/31/07
30,000 06/22/06
210 06 / 32157
NEEDS CONCRETE RESTORATION WORK. Note Last Updated on 12-MAR-07 W LAWRENCE AVE AND N PULASKI RD
1.0
05/01/07
01/05/07
28,000 05/01/07
210 06 0209 / 4452
W LAWRENCE AVE AND N PULASKI RD
1.0
10/01/05
08/15/06
66,900 08/23/05
210 06 0231 / 4470
W MONTROSE AVE AND N PULASKI RD
.0
03/01/08
12/01/08
210 06 0158 / 5058
W PETERSON AVE AND N KIMBALL AVE
.50
06/02/06
02/19/07
Totals per Left Turn Arrow
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N KOSTNER AVE AND W FOSTER AVE
Work Type: Signal Realignment 300 06 0225 / 5340 Totals per Traffic
N ELSTON AVE AND N PULASKI RD
4.50
85
0
22,347
95
08/28/07
29,285
100
08/15/06
37,250
60
103,482 30,000 06/22/06
03/02/07
416,882
0
0
33,249
100
122,216
Crossings 2.0
8,000 01/16/02
04/08/02
18,374
100
6,000 08/15/04
10/13/04
4,055
100
Intersections 1.0
09/13/04
09/20/04
650,982
1,695,686
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 407
1/1/2008 AND 12/31/2008
Ward 39 Margaret Laurino CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: Signals 300 06 0096 / 5258
4404 W LAWRENCE AVE
Work Type: TSM Install
Intersections 23.0
11/09/03
11/16/03
0 10/08/03
10/15/03
3,637
100
Locations
210 06 0074 / 4338
N KEELER AVE AND W LAWRENCE AVE
1.0
05/01/03
07/01/03
138,000 09/17/02
03/07/03
114,877
100
300 06 0199 / 5324
W PETERSON AVE AND N PULASKI RD
1.0
09/01/01
10/01/02
82,100 09/17/01
08/19/02
89,597
100
814 06 0114 / 16329
4800 N CENTRAL PARK AVE
1.0
01/28/92
01/28/92
0 01/28/92
01/28/92
103,623
100
814 06 0307 / 16519
4140 N ELSTON AVE
1.0
03/04/92
03/04/92
0 03/04/92
03/04/92
134,857
100
814 06 0331 / 16534
4400 N ELSTON AVE
1.0
09/13/91
09/13/91
0 09/13/91
09/13/91
106,875
100
814 06 0279 / 16491
4665 N ELSTON AVE
1.0
01/22/92
01/22/92
0 01/22/92
01/22/92
134,857
100
814 06 0278 / 16490
4801 N ELSTON AVE
1.0
02/25/92
02/25/92
0 02/25/92
02/25/92
134,857
100
814 06 0081 / 16297
4000 N PULASKI RD
1.0
11/02/94
11/02/94
0 11/02/94
11/02/94
135,031
100
814 06 0376 / 16566
4000 N PULASKI RD
1.0
03/13/92
03/13/92
0 03/13/92
03/13/92
73,893
100
814 06 0297 / 16509
4200 N PULASKI RD
1.0
11/21/91
11/21/91
0 11/21/91
11/21/91
106,875
100
814 06 0293 / 16505
4400 N PULASKI RD
1.0
09/12/91
09/12/91
0 09/12/91
09/12/91
106,875
100
814 06 0237 / 16449
3600 W FOSTER AVE
1.0
01/01/90
01/01/90
0 01/01/90
01/01/90
6,200
100
814 06 0200 / 16412
4030 W FOSTER AVE
1.0
11/04/96
11/04/96
0 11/04/96
11/04/96
150,000
100
814 06 0110 / 16325
4100 W IRVING PARK RD
1.0
10/28/94
10/28/94
0 10/28/94
10/28/94
61,572
100
814 06 0239 / 16451
4000 W PETERSON AVE
1.0
01/01/91
01/01/91
0 01/01/91
01/01/91
8,000
100
15.0
220,100
1,467,989
Totals per Construction Phase
3,051,279
4,002,872
Totals for Ward 39
3,315,179
4,012,313
Totals per TSM Install
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 408
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE
.0
04/01/08
08/30/08
0
300 05 0047 / 5162
ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST
.0
07/17/06
07/30/06
0 07/17/06
300 06 / 32277
.0
04/01/08
08/30/08
0
300 06 / 32146
ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON AVE ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
1.0
05/01/07
10/31/07
15,000 05/31/07
300 06 / 32146
ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE
.0
05/01/07
10/31/07
3,900 06/15/07
300 06 0308 / 5414
ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE
.0
02/01/06
07/31/06
300 05 0047 / 5162
ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE
.0
07/17/06
210 06 0240 / 4477
N LINCOLN AVE AND W CATALPA AVE
.0
300 06 0282 / 5390
W PETERSON AVE AND N RICHMOND ST
281 00 / 33670
2800 W LAWRENCE AVE
300 06 0282 / 5390
3019 W PETERSON AVE
Totals per Design/Engineering
0
0
0
0
0
0
06/28/07
0
100
08/01/07
2,000
100
0 02/01/06
07/31/06
3,930
100
07/30/06
0 07/17/06
07/30/06
0
0
10/10/05
07/31/06
1,500 10/10/05
11/14/06
1,262
100
500 09/17/04
10/06/04
500
100
.0
01/01/08
12/31/08
1.0
11/02/04
11/22/04
.50
2.50
07/30/06
0 2,500 11/01/04 23,400
11/17/04
0
0
2,330
100
10,022
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 409
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0307 / 5413
ON N ARTESIAN AVE FROM W PETERSON AVE TO W GLENLAKE AVE
5.0
02/15/06
05/31/06
2,000 01/16/06
02/10/06
1,242
100
300 06 0307 / 5413
ON N BELL AVE FROM N BOWMANVILLE AVE TO W BERWYN AVE
1.0
02/23/06
05/31/06
400 01/16/05
02/10/06
248
100
300 06 0307 / 5413
ON N CHRISTIANA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
9.0
03/02/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N DAMEN AVE FROM W PETERSON AVE TO W GRANVILLE AVE
9.0
02/10/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N GLENWOOD AVE FROM W GRANVILLE AVE TO W DEVON AVE
7.0
02/01/06
05/31/06
2,800 01/16/05
02/10/06
1,739
100
300 06 0307 / 5413
ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE
2.0
02/01/06
05/31/06
800 01/16/05
02/10/06
497
100
300 06 0307 / 5413
ON N HAMILTON AVE FROM W NORWOOD ST TO W GRANVILLE AVE
6.0
02/10/06
05/31/06
2,400 01/16/05
02/10/06
1,491
100
300 06 0307 / 5413
ON N HERMITAGE AVE FROM W BRYN MAWR AVE TO W ROSEHILL DR
7.0
02/13/06
05/31/06
2,800 01/16/05
02/10/06
1,739
100
300 06 0307 / 5413
ON N HERMITAGE AVE FROM W DEVON AVE TO W GRANVILLE AVE
10.0
02/03/06
05/31/06
4,000 01/16/05
02/10/06
2,484
100
300 06 0307 / 5413
ON N HERMITAGE AVE FROM W GRANVILLE AVE TO N RIDGE AVE
9.0
02/07/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N HONORE ST FROM W FOSTER AVE TO W FARRAGUT AVE
2.0
02/21/06
05/31/06
800 01/16/05
02/10/06
487
100
300 06 0307 / 5413
ON N HOYNE AVE FROM W FOSTER AVE TO W RASCHER AVE
6.0
02/20/06
05/31/06
2,400 01/16/05
02/10/06
1,491
100
300 06 0307 / 5413
ON N HOYNE AVE FROM W NORWOOD ST TO W GRANVILLE AVE
5.0
02/10/06
05/31/06
2,000 01/16/05
02/10/06
1,242
100
300 06 0307 / 5413
ON N LAKEWOOD AVE FROM W ROSEMONT AVE TO W DEVON AVE
4.0
02/01/06
05/31/06
1,600 01/16/05
02/10/06
994
100
300 06 0307 / 5413
ON N LEAVITT ST FROM N BOWMANVILLE AVE TO W FOSTER AVE
4.0
02/23/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON N MAGNOLIA AVE FROM W ROSEMONT AVE TO W DEVON AVE
4.0
02/01/06
05/31/06
1,600 01/16/05
02/10/06
994
100
300 06 0307 / 5413
ON N MAPLEWOOD AVE FROM N LINCOLN AVE TO W BRYN MAWR AVE
3.0
02/28/06
05/31/06
1,200 01/16/05
02/10/06
745
100
300 06 0307 / 5413
ON N OAKLEY AVE FROM N BOWMANVILLE AVE TO W FOSTER AVE
3.0
02/23/06
05/31/06
1,200 01/16/05
02/10/06
746
100
300 06 0307 / 5413
ON N OAKLEY AVE FROM W PETERSON AVE TO W GLENLAKE AVE
4.0
02/14/06
05/31/06
1,600 01/16/05
02/10/06
994
100
300 06 0307 / 5413
ON N PAULINA ST FROM W FOSTER AVE TO W GREGORY ST
14.0
02/20/06
05/31/06
5,600 01/16/05
02/10/06
3,478
100
300 06 0307 / 5413
ON N PAULINA ST FROM W GRANVILLE AVE TO W DEVON AVE
9.0
02/03/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE
9.0
02/07/06
05/31/06
3,600 01/16/05
02/10/06
2,237
100
300 06 0069 / 5233
ON N RAVENSWOOD AVE FROM W FOSTER AVE TO W BERWYN AVE
5.0
06/30/02
06/30/02
1,050 06/27/02
06/27/02
1,015
100
300 06 0307 / 5413
ON N RAVENSWOOD AVE FROM W ROSEHILL DR TO W BRYN MAWR AVE
7.0
02/13/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 09 / 33101
ON N RICHMOND ST FROM W GEORGE ST TO N LINCOLN AVE
.34
09/02/08
09/03/08
136 09/02/08
09/03/08
81
100
300 06 0307 / 5413
ON N RIDGE AVE FROM N RAVENSWOOD AVE TO W PETERSON AVE
10.0
02/08/06
05/31/06
4,000 01/16/05
02/10/06
2,485
100
300 06 0307 / 5413
ON N SAWYER AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
8.0
03/01/06
05/31/06
3,200 01/16/05
02/10/06
1,989
100
300 06 0307 / 5413
ON N SEELEY AVE FROM W NORWOOD ST TO W HOOD AVE
4.0
02/10/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON N SPAULDING AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE
9.0
03/01/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N WAYNE AVE FROM W ROSEMONT AVE TO W DEVON AVE
3.0
02/01/06
05/31/06
1,200 01/16/05
02/10/06
745
100
300 06 0307 / 5413
ON N WINCHESTER AVE FROM W FOSTER AVE TO W BALMORAL AVE
4.0
02/20/06
05/31/06
1,600 01/16/05
02/10/06
994
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 410
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0307 / 5413
ON N WINCHESTER AVE FROM W PETERSON AVE TO W GRANVILLE AVE
9.0
02/09/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N WOLCOTT AVE FROM W PETERSON AVE TO W GRANVILLE AVE
9.0
02/09/06
05/31/06
3,600 01/16/05
02/10/06
2,236
100
300 06 0307 / 5413
ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE
8.50
02/21/06
05/31/06
3,400 01/16/05
02/10/06
2,113
100
300 06 0307 / 5413
ON W BALMORAL AVE FROM N LINCOLN AVE TO N WESTERN AVE
5.0
02/28/06
05/31/06
2,000 01/16/05
02/10/06
1,242
100
300 06 0307 / 5413
ON W BALMORAL AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE
7.0
02/17/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE
7.0
02/17/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W BERWYN AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE
24.0
02/25/06
05/31/06
9,600 01/16/05
02/10/06
5,963
100
300 06 0307 / 5413
ON W BERWYN AVE FROM N WESTERN AVE TO N LINCOLN AVE
6.0
02/26/06
05/31/06
2,400 01/16/05
02/10/06
1,491
100
300 06 0307 / 5413
ON W CATALPA AVE FROM N KIMBALL AVE TO N KEDZIE AVE
6.0
02/28/06
05/31/06
2,400 01/16/05
02/10/06
1,491
100
300 06 0307 / 5413
ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST
3.0
03/02/06
05/31/06
1,200 01/16/05
02/10/06
745
100
300 06 0307 / 5413
ON W CATALPA AVE FROM N RAVENSWOOD AVE TO N CLARK ST
7.0
02/16/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W CATALPA AVE FROM N WESTERN AVE TO N LINCOLN AVE
4.0
02/28/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON W EDGEWATER AVE FROM N HERMITAGE AVE TO N CLARK ST
5.0
02/15/06
05/31/06
2,000 01/16/05
02/10/06
1,242
100
300 06 0307 / 5413
ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE
8.0
02/20/06
05/31/06
3,200 01/16/05
02/10/06
1,989
100
300 06 0307 / 5413
ON W FARRAGUT AVE FROM N RAVENSWOOD AVE TO N WESTERN AVE
17.0
02/26/06
05/31/06
6,800 01/16/05
02/10/06
4,225
100
300 06 0307 / 5413
ON W GLENLAKE AVE FROM N HERMITAGE AVE TO N CLARK ST
5.0
02/08/06
05/31/06
2,000 01/16/05
02/10/06
1,242
100
300 06 0307 / 5413
ON W GRANVILLE AVE FROM N GREENVIEW AVE TO N CLARK ST
6.0
02/02/06
05/31/06
2,400 01/16/05
02/10/06
1,491
100
300 06 0307 / 5413
ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE
16.50
02/07/06
05/31/06
6,600 01/16/05
02/10/06
4,100
100
300 06 0307 / 5413
ON W GREGORY ST FROM N RAVENSWOOD AVE TO N ASHLAND AVE
7.0
02/16/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W HIGHLAND AVE FROM N CLARK ST TO N RAVENSWOOD AVE
9.0
02/06/06
05/31/06
3,600 01/16/05
02/10/06
2,237
100
300 06 0307 / 5413
ON W HIGHLAND AVE FROM N GLENWOOD AVE TO N CLARK ST
4.0
02/02/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON W HOLLYWOOD AVE FROM N HERMITAGE AVE TO N CLARK ST
5.0
02/14/06
05/31/06
2,000 01/16/05
02/10/06
1,243
100
300 06 0307 / 5413
ON W HOLLYWOOD AVE FROM N JERSEY AVE TO N SPAULDING AVE
3.0
03/01/06
05/31/06
1,200 01/16/05
02/10/06
746
100
300 06 0307 / 5413
ON W HOOD AVE FROM N DAMEN AVE TO N RAVENSWOOD AVE
7.0
02/14/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W HOOD AVE FROM N HAMILTON AVE TO N SEELEY AVE
2.0
02/08/06
05/31/06
800 01/16/05
02/10/06
497
100
300 06 0307 / 5413
ON W NORWOOD ST FROM N RAVENSWOOD AVE TO N HAMILTON AVE
11.0
02/08/06
05/31/06
4,400 01/16/05
02/10/06
2,733
100
300 06 0307 / 5413
ON W OLIVE AVE FROM N JERSEY AVE TO N SPAULDING AVE
3.0
02/28/06
05/31/06
1,200 01/16/05
02/10/06
745
100
300 06 0307 / 5413
ON W OLIVE AVE FROM N RAVENSWOOD AVE TO N CLARK ST
10.0
02/13/06
05/31/06
4,000 01/16/05
02/10/06
2,485
100
300 06 0307 / 5413
ON W RASCHER AVE FROM N DAMEN AVE TO N HOYNE AVE
4.0
02/24/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON W RASCHER AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE
7.0
02/16/06
05/31/06
2,800 01/16/05
02/10/06
1,729
100
300 06 0307 / 5413
ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY
1.50
02/02/06
05/31/06
600 01/16/05
02/10/06
373
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 411
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0307 / 5413
ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N CLARK ST
8.0
02/02/06
05/31/06
3,200 01/16/05
02/10/06
1,988
100
300 06 0307 / 5413
7.0
02/17/06
05/31/06
2,800 01/16/05
02/10/06
1,728
100
300 06 0307 / 5413
ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N ASHLAND AVE ON W SUMMERDALE AVE FROM N RAVENSWOOD AVE TO N LEAVITT ST
16.0
02/25/06
05/31/06
6,400 01/16/05
02/10/06
3,975
100
300 06 0307 / 5413
ON W THOME AVE FROM N GLENWOOD AVE TO N CLARK ST
8.0
02/02/06
05/31/06
3,200 01/16/05
02/10/06
1,989
100
300 06 0307 / 5413
ON W THOME AVE FROM N RAVENSWOOD AVE TO N CLARK ST
8.0
02/06/06
05/31/06
3,200 01/16/05
02/10/06
1,988
100
300 06 0307 / 5413
ON W VICTORIA ST FROM N JERSEY AVE TO N SPAULDING AVE
3.0
03/01/06
05/31/06
1,200 01/16/05
02/10/06
826
100
300 06 0069 / 5233
6444 N BOSWORTH AVE
1.0
03/24/02
03/24/02
210 03/21/02
03/21/02
203
100
300 03 0040 / 4911
5850 N LINCOLN AVE
229.0
10/01/04
10/31/04
85,875 10/18/04
10/29/04
50,465
100
300 06 0069 / 5233
1515 W ARTHUR AVE
1.0
03/24/02
03/24/02
210 03/21/02
03/21/02
203
100
300 06 0069 / 5233
1509 W SCHREIBER AVE
1.0
03/24/02
03/24/02
210 03/21/02
03/21/02
203
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
690.84
269,091
164,847
3,870,472
1,864,526
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 412
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 03 0040 / 4911
ON N ASHLAND AVE FROM W FOSTER AVE TO W ROSEHILL DR
110.0
08/20/04
09/20/04
44,000 07/14/04
08/10/04
28,755
100
300 03 0040 / 4911
ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE
8.0
08/20/04
09/20/04
3,200 07/14/04
08/10/04
2,092
100
300 03 0040 / 4911
ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE
119.0
10/01/04
10/31/04
47,600 08/09/04
09/03/04
31,108
100
300 06 0307 / 5413
ON N DAMEN AVE FROM W BALMORAL AVE TO N BOWMANVILLE AVE
7.0
02/20/06
05/31/06
2,800 01/16/05
02/10/06
1,739
100
300 03 0040 / 4911
ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE
20.0
08/20/04
09/20/04
8,000 07/14/04
08/10/04
5,228
100
300 03 0040 / 4911
ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE
7.50
07/30/04
08/30/04
3,000 07/14/04
08/10/04
1,961
100
300 03 0040 / 4911
ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE
33.93
08/20/04
09/20/04
13,572 07/14/04
08/10/04
8,870
100
300 03 0040 / 4911
ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
2.50
08/20/04
09/20/04
1,000 07/14/04
08/10/04
654
100
300 03 0040 / 4911
ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE
163.0
08/20/04
09/20/04
65,200 07/14/04
08/10/04
42,610
100
300 03 0047 / 4918
ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE
5.0
11/01/04
11/20/04
2,000 10/01/04
10/15/04
2,087
100
300 03 0040 / 4911
ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE
162.75
08/20/04
09/20/04
65,100 07/14/04
08/10/04
42,544
100
300 03 0040 / 4911
ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE
55.0
08/20/04
09/20/04
22,000 07/14/04
08/10/04
14,378
100
300 03 0039 / 4910
ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE
21.0
10/01/04
10/05/04
9,225 10/01/04
10/01/04
3,108
100
300 03 0040 / 4911
ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE
54.0
08/20/04
09/20/04
21,600 07/14/04
08/10/04
14,116
100
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
78.10
08/20/04
09/20/04
31,240 07/14/04
08/10/04
20,416
100
300 03 0047 / 4918
ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE
18.0
11/01/04
11/20/04
7,200 10/01/04
10/15/04
5,167
100
300 06 0122 / 5275
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
1.89
12/15/03
12/21/03
756 12/09/03
12/14/03
549
100
300 06 0307 / 5413
ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE
.50
02/02/06
05/31/06
200 01/16/05
02/10/06
124
100
300 03 0040 / 4911
ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE
10.08
08/20/04
09/20/04
4,032 07/14/04
08/10/04
2,635
100
300 03 0040 / 4911
ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE
127.98
08/20/04
09/20/04
51,192 08/01/04
08/20/04
33,455
100
300 03 0050 / 4921
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
29.76
10/01/04
10/20/04
11,904 08/27/04
09/06/04
8,288
100
Totals per 400 Watt Changeout
1,034.99
414,821
269,881
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 413
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0746 / 6932
5638 N ARTESIAN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0803 / 6989
4862 N CALIFORNIA AVE
1.0
06/10/96
06/10/96
0 06/10/96
06/10/96
300
100
302 00 0083 / 5768
5716 N CLARK ST
0 11/18/97
11/18/97
267
100
805 06 1270 / 7456
5716 N CLARK ST
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1550 / 7736
6327 N LAKEWOOD AVE
1.0
10/09/97
10/09/97
0 10/09/97
10/09/97
300
100
805 06 1658 / 7844
6333 N LAKEWOOD AVE
1.0
08/01/97
08/01/97
0 08/01/97
08/01/97
300
100
805 06 2025 / 8211
6417 N LAKEWOOD AVE
1.0
05/13/96
05/13/96
0 05/13/96
05/13/96
300
100
805 06 0320 / 6506
5214 N LINCOLN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2073 / 8259
5252 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2075 / 8261
5311 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2076 / 8262
5331 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2077 / 8263
5336 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2078 / 8264
5405 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2063 / 8249
5411 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2080 / 8266
5427 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2071 / 8257
5430 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2082 / 8268
5438 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2083 / 8269
5441 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2084 / 8270
5455 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2057 / 8243
5566 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2058 / 8244
5570 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2072 / 8258
5617 N LINCOLN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2059 / 8245
5651 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2060 / 8246
5659 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2061 / 8247
5660 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2062 / 8248
5672 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2081 / 8267
5694 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0312 / 6498
5710 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0303 / 6489
5724 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2079 / 8265
5740 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0306 / 6492
5750 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 414
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0307 / 6493
5758 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0308 / 6494
5800 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0309 / 6495
5808 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2094 / 8280
5811 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0311 / 6497
5816 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
300 06 0139 / 5289
5850 N LINCOLN AVE
1,001.0
03/01/06
09/01/06
24,994 05/20/06
06/01/06
30,244
100
302 00 0092 / 5774
5850 N LINCOLN AVE
8.0
0 03/16/01
12/19/01
1,885
100
805 06 0302 / 6488
5854 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0313 / 6499
5915 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0314 / 6500
5921 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0315 / 6501
5930 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2088 / 8274
5938 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2089 / 8275
5944 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 2090 / 8276
5951 N LINCOLN AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 1886 / 8072
5523 N MAPLEWOOD AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 1870 / 8056
5541 N MAPLEWOOD AVE
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 1925 / 8111
6443 N NEWGARD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1906 / 8092
6516 N NEWGARD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0692 / 6878
5543 N ROCKWELL ST
1.0
08/13/96
08/13/96
0 08/13/96
08/13/96
300
100
805 06 0498 / 6684
5523 N SPAULDING AVE
1.0
01/26/96
01/26/96
0 01/26/96
01/26/96
300
100
805 06 0885 / 7071
2859 W BERWYN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0837 / 7023
2544 W CARMEN AVE
1.0
06/21/96
06/21/96
0 06/21/96
06/21/96
300
100
805 06 0828 / 7014
2608 W CARMEN AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1109 / 7295
1420 W HIGHLAND AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1110 / 7296
3243 W HOLLYWOOD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0577 / 6763
3229 W OLIVE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0431 / 6617
1921 W SUMMERDALE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1750 / 7936
2610 W WINONA ST
1.0
05/22/97
05/22/97
0 05/22/97
05/22/97
300
100
Totals per Alley Lighting/Lamps
1,065.0
24,994
49,196
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 415
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0238 / 5352
5850 N LINCOLN AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5850 N LINCOLN AVE
Work Type: Flood Light Install
Lamps 1,400.0
06/01/07
12/31/07
41,216 07/21/07
01/01/08
41,216
100
0 04/17/02
04/20/02
23,762
100
Installations 1,305.0
Fixtures
300 06 0167 / 5306
N CLARK ST AND W SCHREIBER AVE
3.0
0 11/30/99
11/30/99
1,053
100
300 06 0167 / 5306
N PAULINA ST AND W GREGORY ST
3.0
0 11/30/99
11/30/99
1,053
100
302 00 0092 / 5774
4911 N FRANCISCO AVE
1.0
0 02/05/01
02/05/01
471
100
302 00 0092 / 5774
6559 N GLENWOOD AVE
2.0
0 10/10/01
10/10/01
689
100
302 00 0092 / 5774
1339 W LOYOLA AVE
1.0
0 10/10/01
10/10/01
345
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
2800 W LAWRENCE AVE
Work Type: Lighting Imprvmnts 281 00 / 33670
2800 W LAWRENCE AVE
Work Type: Lighting Imprvmnts 300 06 0282 / 5390
W PETERSON AVE AND N RICHMOND ST
Work Type: Loop Lighting 281 00 / 33670
2800 W LAWRENCE AVE
Work Type: Ornamental - Piggyback Lighting
10.0
0
3,611
Blocks .0
01/01/08
12/31/08
0
0
0
01/01/08
12/31/08
0
0
0
10/06/04
10/31/04
0
0
0
01/01/08
12/31/08
0
0
0
Installations .0
Projects .0
Blocks .0
Fixtures
300 03 0040 / 4911
ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE
16.0
08/20/04
09/20/04
21,600 08/10/04
08/10/04
19,200
100
300 03 0040 / 4911
ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE
14.0
10/01/04
10/10/04
18,900 10/01/04
10/10/04
17,500
100
300 06 0307 / 5413
ON W CATALPA AVE FROM N LINCOLN AVE TO N ROCKWELL ST
3.0
03/02/06
05/31/06
6,000 01/16/05
02/10/06
4,500
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting 281 00 / 33670
2800 W LAWRENCE AVE
33.0
46,500
41,200
0
0
Blocks .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 416
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670
2800 W LAWRENCE AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
5850 N LINCOLN AVE
Work Type: Residntl Staggered Lighting
Poles .0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Lamps .0
Blocks
300 07 0040 / 5463
ON N CALIFORNIA AVE FROM W BALMORAL AVE TO W FOSTER AVE
2.0
04/18/06
11/18/06
150,000 10/23/06
04/20/07
110,259
100
300 07 0040 / 5463
ON N CALIFORNIA AVE FROM W BRYN MAWR AVE TO W BALMORAL AVE
2.0
04/18/06
11/18/06
150,000 10/23/06
04/20/07
110,565
100
300 09 / 33106
ON N LAKEWOOD AVE FROM W DEVON AVE TO W ARTHUR AVE
1.0
65,000 04/01/08
12/01/08
0
0
300 09 / 33106
ON N MAGNOLIA AVE FROM W DEVON AVE TO W ARTHUR AVE
1.0
65,000 04/01/08
12/01/08
0
0
300 09 / 33106
ON N PAULINA ST FROM W PETERSON AVE TO W GRANVILLE AVE
2.0
130,000 04/01/08
12/01/08
0
0
300 09 / 33106
ON N RICHMOND ST FROM W BRYN MAWR AVE TO N LINCOLN AVE
3.0
162,500 04/01/08
12/01/08
0
0
300 06 / 32277
ON N RICHMOND ST FROM W HOLLYWOOD AVE TO W PETERSON AVE
.0
05/04/08
12/31/08
0
0
0
300 06 / 32277
.0
05/04/08
12/31/08
0
0
0
300 05 0040 / 5155
ON N SACRAMENTO AVE FROM W HOLLYWOOD AVE TO W PETERSON AVE ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BERWYN AVE
1.0
04/04/05
11/18/05
85,000 09/07/05
11/18/05
65,615
100
300 06 0298 / 5405
ON N VIRGINIA AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
2.0
09/07/05
11/07/05
0 09/07/05
11/17/05
62,821
100
300 09 / 33106
ON N WAYNE AVE FROM W DEVON AVE TO W ARTHUR AVE
1.0
65,000 04/01/08
12/01/08
0
0
300 07 0040 / 5463
ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE
.50
100
300 09 / 33106
ON W ARTHUR AVE FROM N GLENWOOD AVE TO N LAKEWOOD AVE
1.0
300 11 / 32229
ON W BALMORAL AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
300 11 / 32229
ON W BERWYN AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
300 06 / 32146
ON W CATALPA AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
300 11 / 32229
ON W FARRAGUT AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
300 06 / 32146
ON W GREGORY ST FROM N CALIFORNIA AVE TO N VIRGINIA AVE
300 11 / 32229 300 06 0308 / 5414 300 11 / 32229
07/17/06
09/08/06
42,500 08/14/06
10/13/06
38,578
65,000 04/01/08
12/01/08
0
0
08/13/07
12/21/07
120,000 08/13/07
0
10
08/06/07
01/31/08
2.0
08/10/07
01/31/08
330,125
ON W RASCHER AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
08/16/07
12/21/07
120,000 08/16/07
ON W ROSEHILL DR FROM N RAVENSWOOD AVE TO N ASHLAND AVE
2.0
06/20/06
09/08/06
191,486 06/20/06
ON W SUMMERDALE AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
2.0
Totals per Residntl Staggered Lighting
32.50
108,000 08/13/07 330,125 08/16/07
12/04/07
108,000 08/16/07
108,000 08/20/07 2,395,736
0
10
0
100
0
5
02/04/08
0
100
0
5
09/08/06
129,120
100
0
5
516,958
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 417
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375
ON N VIRGINIA AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE
300 06 0305 / 5411
ON W BRYN MAWR AVE FROM N CALIFORNIA AVE TO N VIRGINIA AVE
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
2800 W LAWRENCE AVE
Work Type: Short Arm Installs - Residntl
Blocks 2.0
03/22/04
05/22/04
147,308 03/22/04
05/07/04
145,067
100
2.50
11/01/05
01/31/06
200,000 11/08/05
03/17/06
174,554
100
4.50
347,308
319,621
0
0
0
Locations .0
01/01/08
12/31/08
Locations
302 00 0092 / 5774
4811 N FRANCISCO AVE
1.0
0 02/05/01
02/05/01
378
100
302 00 0092 / 5774
4812 N FRANCISCO AVE
1.0
0 03/27/01
03/27/01
378
100
302 00 0092 / 5774
4833 N FRANCISCO AVE
1.0
0 02/05/01
02/05/01
378
100
302 00 0092 / 5774
4851 N FRANCISCO AVE
1.0
0 02/05/01
02/05/01
378
100
302 00 0092 / 5774
1455 W ARTHUR AVE
1.0
0 03/14/01
03/14/01
378
100
281 00 / 33670
2800 W LAWRENCE AVE
.0
302 00 0092 / 5774
2902 W LAWRENCE AVE
2.0
0 03/27/01
7.0
0
Totals per Short Arm Installs - Residntl
01/01/08
12/31/08
0 03/27/01
0
0
756
100
2,646
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 418
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 03 0040 / 4911
ON N ASHLAND AVE FROM W ROSEHILL DR TO W FOSTER AVE
114.0
05/10/04
09/10/04
34,000 05/10/04
08/01/04
30,780
100
300 03 0040 / 4911
ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE
8.0
05/10/04
09/10/04
2,200 05/10/04
08/01/04
2,160
100
300 03 0040 / 4911
ON N CALIFORNIA AVE FROM W LAWRENCE AVE TO W PETERSON AVE
128.0
10/01/04
10/31/04
39,100 08/01/04
09/01/04
34,560
100
300 03 0040 / 4911
ON N DAMEN AVE FROM W FOSTER AVE TO W BALMORAL AVE
22.0
05/10/04
09/10/04
6,400 05/10/04
08/01/04
5,940
100
300 03 0040 / 4911
ON N JERSEY AVE FROM W BRYN MAWR AVE TO W ARDMORE AVE
7.50
05/10/04
09/10/04
1,875 05/10/04
08/01/04
2,025
100
300 03 0040 / 4911
ON N KEDZIE AVE FROM W FOSTER AVE TO W BRYN MAWR AVE
50.46
05/10/04
09/10/04
15,138 05/10/04
08/01/04
13,624
100
300 03 0040 / 4911
ON N KIMBALL AVE FROM W BALMORAL AVE TO W BRYN MAWR AVE
4.0
05/10/04
09/10/04
1,450 05/10/04
08/01/04
1,080
100
300 03 0040 / 4911
ON N LINCOLN AVE FROM W WINNEMAC AVE TO W PETERSON AVE
174.0
05/10/04
09/10/04
50,650 05/10/04
08/01/04
46,980
100
300 03 0047 / 4918
ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE
5.50
11/01/04
11/20/04
1,750 10/01/04
10/20/04
1,298
100
300 03 0040 / 4911
ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE
150.66
05/10/04
09/10/04
41,339 05/10/04
08/01/04
40,678
100
300 03 0040 / 4911
ON W BRYN MAWR AVE FROM N ASHLAND AVE TO N DAMEN AVE
58.0
05/10/04
09/10/04
14,125 05/10/04
08/01/04
15,660
100
300 03 0039 / 4910
ON W BRYN MAWR AVE FROM N KIMBALL AVE TO N KEDZIE AVE
21.0
08/27/04
09/03/04
5,250 07/01/04
07/10/04
5,192
100
300 03 0040 / 4911
ON W BRYN MAWR AVE FROM N WESTERN AVE TO N KIMBALL AVE
58.0
05/10/04
09/10/04
14,125 05/10/04
08/01/04
15,660
100
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
75.97
05/10/04
09/10/04
22,862 05/10/04
08/01/04
20,512
100
300 03 0047 / 4918
ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE
21.50
11/01/04
11/20/04
6,500 10/01/04
10/20/04
5,101
100
300 06 0108 / 5263
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
2.43
03/01/04
03/10/04
717 04/12/04
05/07/04
594
100
300 03 0040 / 4911
ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE
10.71
05/10/04
09/10/04
3,276 05/10/04
08/01/04
2,892
100
300 03 0050 / 4921
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
31.93
10/01/04
10/20/04
9,037 07/10/04
08/27/04
8,918
100
300 03 0040 / 4911
ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST
157.95
05/10/04
09/10/04
38,799 05/10/04
08/01/04
42,647
100
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0078 / 5241
ON W BERWYN AVE FROM N WESTERN AVE TO N BOWMANVILLE AVE
281 00 / 33670
2800 W LAWRENCE AVE
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
5850 N LINCOLN AVE
1,101.61
308,592
296,300
Blocks 1.0
11/18/02
11/29/02
.0
01/01/08
12/31/08
1.0
8,200 11/30/02
566
100
0
11/30/02
0
0
8,200
566
Lamps 2,068.0
03/01/04
12/01/04
10,754 11/09/06
11/30/06
22,520
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 419
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0217 / 5337
5850 N LINCOLN AVE
58.0
302 00 0072 / 5760
6400 N RAVENSWOOD AVE
805 06 2531 / 8717
6088 N RIDGE AVE
14.0
03/09/95
805 06 2327 / 8513
1270 W ALBION AVE
18.0
805 06 2842 / 9028
1805 W BALMORAL AVE
805 06 2736 / 8922
1800 W BRYN MAWR AVE
805 06 2913 / 9099
1800 W FOSTER AVE
805 06 2676 / 8862
3,260 06/08/04
06/10/04
3,469
100
0 02/29/00
03/09/00
11,800
100
03/09/95
0 03/09/95
03/09/95
10,500
100
05/13/96
05/13/96
0 05/13/96
05/13/96
13,500
100
6.0
12/29/93
12/29/93
0 12/29/93
12/29/93
4,500
100
10.0
11/03/94
11/03/94
0 11/03/94
11/03/94
7,500
100
6.0
12/16/93
12/16/93
0 12/16/93
12/16/93
4,500
100
1790 W GRANVILLE AVE
10.0
12/01/94
12/01/94
0 12/01/94
12/01/94
7,500
100
805 06 2150 / 8336
1305 W NORTH SHORE AVE
13.0
12/31/94
12/31/94
0 12/31/94
12/31/94
9,750
100
302 00 0071 / 5759
1330 W NORTH SHORE AVE
0 04/04/99
04/12/99
16,682
100
805 06 2528 / 8714
1800 W PETERSON AVE
805 06 2671 / 8857
1795 W ROSEHILL DR
805 06 2811 / 8997
1785 W THOME AVE
Totals per Underpass Lighting
05/25/04
06/01/04
1.0
16.0
05/04/94
05/04/94
0 05/04/94
05/04/94
12,000
100
4.0
11/01/94
11/01/94
0 11/01/94
11/01/94
3,000
100
10.0
07/28/94
07/28/94
0 07/28/94
07/28/94
7,500
100
166.0
3,260
112,201
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 420
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N LINCOLN AVE AND W CATALPA AVE
1.0
0 10/24/02
10/24/02
1,850
100
210 06 0130 / 4389
N WESTERN AVE AND W BERWYN AVE
1.0
0 04/25/02
04/25/02
7,324
100
210 06 0130 / 4389
N WESTERN AVE AND W BRYN MAWR AVE
1.0
0 04/24/02
04/24/02
8,539
100
210 06 0130 / 4389
N WESTERN AVE AND W FOSTER AVE
.50
0 05/14/02
05/14/02
925
100
210 06 0219 / 4459
N WESTERN AVE AND W FOSTER AVE
.50
04/22/05
04/23/05
5,282 04/13/05
04/13/05
4,985
100
210 06 0219 / 4459
N WESTERN AVE AND W PETERSON AVE
1.0
04/24/05
04/25/05
10,563 03/07/05
03/07/05
10,489
100
210 06 0130 / 4389
N WESTERN AVE AND W WINNEMAC AVE
.50
0 04/25/02
04/25/02
3,662
100
300 06 0225 / 5340
5800 N RICHMOND ST
4.0
8,350 07/12/02
07/25/02
14,430
100
210 06 0128 / 4387
W FOSTER AVE AND N LEAVITT ST
210 06 0231 / 4470
W PETERSON AVE AND N WESTERN AVE
10/31/02
9.50
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
09/02/02
24,195
52,204
Locations .50
12/31/01
01/31/02
7,500
0
.0
03/01/08
12/01/08
4,000
0
0
TOTAL PROJECT IS $8,000 WITH $4,000 COMING FROM THE 40TH WARD MENU UNDER 2005,2006,2007. AUTHORIZED PER OBM TO PROCEED ON 11/20/08 PER THE DIRECTOR. Note Last Updated on 21-NOV-08 .50
Totals per Left Turn Arrow
Work Type: New Signal 300 06 0283 / 5391
300 09 / 33106
0
Locations
ON N LINCOLN AVE FROM W BERWYN AVE TO W CATALPA AVE
Work Type: Pedestrian Countdown Signal Install
11,500
1.0
09/01/04
09/30/04
92 09/09/04
09/09/04
92
100
09/23/08
09/23/08
12,000 09/23/08
09/23/08
6,795
100
09/12/06
09/12/06
12,500 09/12/06
09/12/06
8,960
100
4,000 01/07/02
04/08/02
15,345
100
0 09/17/03
09/22/03
6,167
100
Locations
N CLARK ST AND W GRANVILLE AVE
1.0
SR#08-01886806 GJ#3885 COMP.09/23/08 Note Last Updated on 30-DEC-08
Work Type: Pedestrian Crosswalk Signals 210 06 0240 / 4477
N LINCOLN AVE AND W CATALPA AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
5740 N CALIFORNIA AVE
Work Type: Signals 300 06 0096 / 5258 Totals per Traffic
5850 N LINCOLN AVE
Locations 1.0
Crossings 1.0
Intersections 39.0
10/15/03
10/21/03
89,387
846,031
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 421
1/1/2008 AND 12/31/2008
Ward 40 Patrick J. O Conner CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
300 06 0166 / 5305
W HOLLYWOOD AVE AND N ASHLAND AVE
03/01/01
07/01/01
25,100 01/22/01
04/02/01
31,175
100
814 06 0196 / 16408
4800 N CALIFORNIA AVE
1.0
09/10/96
09/10/96
0 09/10/96
09/10/96
150,000
100
814 06 0088 / 16304
5200 N FRANCISCO AVE
1.0
12/02/93
12/02/93
0 12/02/93
12/02/93
84,096
100
814 06 0136 / 16350
5200 N LINCOLN AVE
1.0
04/27/93
04/27/93
0 04/27/93
04/27/93
119,631
100
814 06 0368 / 16558
5300 N LINCOLN AVE
1.0
04/10/95
04/10/95
0 04/10/95
04/10/95
110,783
100
814 06 0397 / 16584
5500 N LINCOLN AVE
1.0
04/28/95
04/28/95
0 04/28/95
04/28/95
110,783
100
814 06 0198 / 16410
4800 N ROCKWELL ST
1.0
09/10/96
09/10/96
0 09/10/96
09/10/96
150,000
100
6.0
25,100
756,468
Totals per Construction Phase
3,959,859
2,710,557
Totals for Ward 40
3,983,259
2,720,579
Totals per TSM Install
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 422
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32277
ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE
4.0
04/01/08
08/30/08
260,000 05/10/08
0
90
300 06 0308 / 5414
ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,870
100
300 06 / 32275
ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE
.0
03/01/07
10/31/07
3,900 02/09/07
03/09/07
2,605
100
210 06 0240 / 4477
N HARLEM AVE AND W HIGGINS AVE
.0
10/10/05
07/31/06
1,200 10/10/05
02/15/06
134
100
210 06 0240 / 4477
W BRYN MAWR AVE AND N HARLEM AVE
.0
10/10/05
07/31/06
1,200 10/10/05
08/08/06
135
100
Totals per Design/Engineering
4.0
266,300
4,744
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 423
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 11 / 32230
ON N SAYRE AVE FROM W DEVON AVE TO W HAYES AVE
Work Type: Alley Lighting/Lamps
Fixtures 6.0
2,600
0
0
Installations
805 06 0335 / 6521
6324 N LEONA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1896 / 8082
5610 N NAGLE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1917 / 8103
5634 N NAGLE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1898 / 8084
6158 N NAGLE AVE
1.0
05/30/96
05/30/96
0 05/30/96
05/30/96
300
100
805 06 1897 / 8083
5526 N NATOMA AVE
1.0
11/04/96
11/04/96
0 11/04/96
11/04/96
300
100
805 06 1916 / 8102
5916 N NEWARK AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
300
100
805 06 1514 / 7700
5826 N NINA AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 0592 / 6778
6509 N NORTHWEST HWY
1.0
12/20/96
12/20/96
0 12/20/96
12/20/96
300
100
805 06 0593 / 6779
6517 N NORTHWEST HWY
1.0
12/20/96
12/20/96
0 12/20/96
12/20/96
300
100
300 06 0139 / 5289
6550 N NORTHWEST HWY
1,775.0
03/01/06
09/01/06
41,106 06/01/06
07/01/06
53,630
100
302 00 0092 / 5774
6650 N NORTHWEST HWY
20.0
0 02/20/01
11/07/01
4,713
100
805 06 0574 / 6760
6623 N OKETO AVE
1.0
03/11/96
03/11/96
0 03/11/96
03/11/96
300
100
805 06 0575 / 6761
6837 N OLCOTT AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1472 / 7658
5121 N RUTHERFORD AVE
1.0
11/17/97
11/17/97
0 11/17/97
11/17/97
300
100
805 06 0833 / 7019
7459 W CATALPA AVE
1.0
01/02/96
01/02/96
0 01/02/96
01/02/96
300
100
805 06 0818 / 7004
8502 W CATALPA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0836 / 7022
8522 W CATALPA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0827 / 7013
8538 W CATALPA AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0933 / 7119
7307 W FITCH AVE
1.0
10/22/96
10/22/96
0 10/22/96
10/22/96
300
100
805 06 1119 / 7305
7629 W GREGORY ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0557 / 6743
7305 W RASCHER AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 0398 / 6584
7311 W TOUHY AVE
1.0
03/13/97
03/13/97
0 03/13/97
03/13/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
6650 N NORTHWEST HWY
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
6650 N NORTHWEST HWY
1,815.0
41,106
64,343
Lamps 1,752.0
06/01/07
12/31/07
51,578 09/01/07
09/21/07
51,578
100
0 04/09/02
04/12/02
30,171
100
Installations 1,657.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 424
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install 300 06 0167 / 5306
6220 N OLCOTT AVE
Work Type: Irrigation System - Power Supply 300 06 0166 / 5305
6308 N AVONDALE AVE
Work Type: Ornamental Lighting
Fixtures 2.0
0 01/18/99
01/18/99
702
100
05/09/00
13,235
100
Locations 1.0
04/18/00
05/09/00
11,838 04/18/00
Blocks
300 06 0117 / 5271
ON N NORTHWEST HWY FROM N NETTLETON AVE TO N SAYRE AVE
300 07 0041 / 5464
ON N NORTHWEST HWY FROM N NEWARK AVE TO N SAYRE AVE
3.0
04/18/06
11/18/06
450,000 08/14/06
300 06 0064 / 5231
ON N NORTHWEST HWY FROM N OGALLAH AVE TO N OVERHILL AVE
2.0
11/28/97
03/31/98
16,850 05/13/98
11/06/98
300 06 0064 / 5231
6700-6734 N OLMSTED AVE
.50
11/28/97
03/31/98
16,850 05/13/98
302 00 0098 / 5778
5600 W DEVON AVE
4.0
09/01/02
06/23/03
645,345 08/26/02
Totals per Ornamental Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
6650 N NORTHWEST HWY
Work Type: Residntl Staggered Lighting
1.50
35,000
11.0
0 0
15
17,909
100
11/06/98
17,909
100
06/18/03
644,104
100
1,164,045
679,922
Lamps .0
03/01/08
12/01/08
0
0
0
2.0
09/20/07
11/30/07
127,500
0
0
Blocks
300 11 / 32230
ON N OLIPHANT AVE FROM N AVONDALE AVE TO W PRATT AVE
300 06 / 32277
not issued Note Last Updated on 04-MAR-09 ON N OSCEOLA AVE FROM W TOUHY AVE TO W PRATT AVE
.0
05/04/08
12/31/08
0
0
300 06 0308 / 5414
ON W COYLE AVE FROM N ODELL AVE TO N HARLEM AVE
2.0
04/06/06
06/16/06
151,613 04/07/06
06/09/06
119,178
100
300 06 / 32275
ON W IBSEN ST FROM N HARLEM AVE TO N ODELL AVE
2.0
04/01/07
12/31/07
151,400 03/27/07
07/20/07
150,817
100
300 06 0298 / 5405
ON W LUNT AVE FROM N HARLEM AVE TO N ODELL AVE
2.0
06/01/05
07/01/05
0 05/13/05
07/15/05
112,118
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
8.0
0
430,513
382,113
Blocks
300 06 0235 / 5349
ON W FITCH AVE FROM N HARLEM AVE TO N ODELL AVE
2.0
09/01/03
11/01/03
145,441 08/18/03
10/29/03
131,302
100
300 06 0267 / 5375
ON W GREENLEAF AVE FROM N HARLEM AVE TO N ODELL AVE
2.0
04/19/04
06/19/04
165,110 04/23/04
06/01/04
157,132
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0194 / 5319
ON W BRYN MAWR AVE FROM N ORIOLE AVE TO N OZARK AVE
4.0
310,551
288,434
16,650
2,255
Blocks 1.50
03/01/01
04/01/01
1
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 425
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting 300 06 0246 / 5356
ON N ALGONQUIN AVE FROM N IONIA AVE TO N DOWAGIAC AVE
300 06 0246 / 5356
ON N DOWAGIAC AVE FROM N WAUKESHA AVE TO N CENTRAL AVE
300 06 0246 / 5356
Blocks .50
09/01/04
11/01/04
141,000 07/26/04
02/10/05
55,009
100
1.50
09/01/04
11/01/04
141,000 07/26/04
02/10/05
55,009
100
ON N HIAWATHA AVE FROM N MENDOTA AVE TO N MANKATO AVE
2.0
09/01/04
08/01/05
150,000 05/23/05
09/23/05
64,644
100
300 06 0246 / 5356
ON N IONIA AVE FROM N CHICORA AVE TO N CENTRAL AVE
3.0
08/01/04
03/31/05
141,000 07/26/04
02/10/05
55,009
100
300 06 0246 / 5356
ON N MANKATO AVE FROM N HIAWATHA AVE TO N IONIA AVE
1.50
09/01/04
08/01/05
115,000 05/23/05
09/23/05
64,644
100
300 06 0246 / 5356
ON N MOSELLE AVE FROM N HIAWATHA AVE TO N LEOTI AVE
.50
40,000 05/23/05
09/23/05
64,644
100
300 06 0246 / 5356
ON N MOSELLE AVE FROM N SIOUX AVE TO N IONIA AVE
1.0
75,000 05/23/05
09/23/05
64,644
100
300 06 0246 / 5356
ON N SIOUX AVE FROM N MOSELLE AVE TO N MANKATO AVE
300 06 0246 / 5356
ON N WAUKESHA AVE FROM N IONIA AVE TO N DOWAGIAC AVE
Work Type: Traffic Signal Regrouping 6550 N NORTHWEST HWY
Work Type: Underpass Lighting 300 06 0217 / 5337
09/01/04
08/01/05
115,000 05/23/05
10/03/05
64,644
100
.50
09/01/04
11/01/04
141,000 07/26/04
02/10/05
55,009
100
12.0
Totals per Strt Lighting
300 06 0139 / 5289
1.50
6650 N NORTHWEST HWY
Totals per Lighting/Electrical
1,059,000
543,256
Lamps 2,195.0
03/01/04
12/01/04
11,414 11/20/06
12/27/06
23,904
100
06/02/04
06/05/04
731 06/10/04
06/11/04
2,088
100
Fixtures 13.0
3,100,026
2,082,001
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 426
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Flashing Yellow Warning Lights 300 06 0166 / 5305
7200 N OSCEOLA AVE
Work Type: LED Signal Head Install
Locations 1.0
03/15/01
04/15/01
15,000 05/03/01
05/04/01
6,451
100
Locations
210 06 0130 / 4389
N ORIOLE AVE AND W DEVON AVE
1.0
0 02/19/02
02/19/02
8,539
100
210 06 0130 / 4389
6725 N OLIPHANT AVE
1.0
0 09/25/01
09/25/01
8,539
100
2.0
0
Totals per LED Signal Head Install
Work Type: Pedestrian Countdown Signal Install
17,078
Locations
210 06 0240 / 4477
N HARLEM AVE AND W HIGGINS AVE
8.0
11/01/05
06/18/07
12,500 11/01/05
07/27/07
4,086
100
210 06 0240 / 4477
W BRYN MAWR AVE AND N HARLEM AVE
6.0
11/01/05
08/22/07
12,500 07/26/07
07/30/07
5,354
100
can not give true field for actual cost to date. No information found altho project is 100% Note Last Updated on 28-JAN-08 Totals per Pedestrian Countdown Signal Install
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N HARLEM AVE AND W PRATT BLVD
Work Type: Signals 300 06 0096 / 5258
6650 N NORTHWEST HWY
Work Type: TSM Install
14.0
25,000
9,440
Crossings 1.0
4,000 04/08/02
04/08/02
0
100
Intersections 28.0
11/14/03
11/20/03
0 09/27/03
10/05/03
4,427
100
Locations
814 06 0322 / 16529
6324 N CALDWELL AVE
1.0
10/22/89
10/22/89
0 10/22/89
10/22/89
212,397
100
814 06 0321 / 16528
6348 N CALDWELL AVE
1.0
10/22/89
10/22/89
0 10/22/89
10/22/89
212,397
100
814 06 0295 / 16507
6400 N CALDWELL AVE
1.0
10/22/89
10/22/89
0 10/22/89
10/22/89
212,397
100
814 06 0294 / 16506
6220 N CENTRAL AVE
1.0
10/22/89
10/22/89
0 10/22/89
10/22/89
212,397
100
814 06 0320 / 16527
6400 N CENTRAL AVE
1.0
06/22/89
06/22/89
0 06/22/89
06/22/89
212,397
100
814 06 0068 / 16284
5400 N CUMBERLAND AVE
1.0
08/12/94
08/12/94
0 08/12/94
08/12/94
140,000
100
814 06 0319 / 16526
6400 N LEHIGH AVE
1.0
10/22/89
10/22/89
0 10/22/89
10/22/89
212,397
100
814 06 0169 / 16381
5800 N NAGLE AVE
1.0
09/28/90
09/28/90
0 09/28/90
09/28/90
103,851
100
210 06 0072 / 4336
5200 N RUTHERFORD AVE
1.0
03/01/01
05/01/01
150,000 04/11/01
08/01/01
150,853
100
814 06 0378 / 16568
6400 W FOSTER AVE
1.0
03/01/97
03/01/97
0 03/01/97
03/27/97
133,900
100
Totals per TSM Install Totals per Traffic
10.0
150,000
1,802,986
194,000
1,840,382
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 427
1/1/2008 AND 12/31/2008
Ward 41 Brian G. Doherty CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Totals per Construction Phase
3,294,026
3,922,383
Totals for Ward 41
3,560,326
3,927,127
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 428
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0308 / 5414
ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST
300 06 0292 / 5399
ON N WABASH AVE FROM E PEARSON ST TO E CHESTNUT ST
210 06 0023 / 4298
Projects .0
02/01/06
07/31/06
0 02/01/06
07/31/06
2,446
100
1.0
11/19/04
05/18/05
1,000 11/19/04
05/18/05
0
100
N CLARK ST AND W ERIE ST
.0
02/06/02
04/02/02
0 02/06/02
04/02/02
0
0
210 06 0023 / 4298
N CLARK ST AND W SUPERIOR ST
.0
02/06/02
04/02/02
0 02/06/02
04/02/02
0
0
210 06 0207 / 4450
N COLUMBUS DR AND E ILLINOIS ST
.0
07/01/04
12/30/04
0 07/01/04
12/30/04
39
100
210 06 0207 / 4450
N FAIRBANKS CT AND E GRAND AVE
.0
07/01/04
12/30/04
0 07/01/04
12/30/04
39
100
210 06 0240 / 4477
N LA SALLE ST AND W LAKE ST
.0
10/10/05
07/31/06
1,200 10/10/05
08/08/06
235
100
210 06 0240 / 4477
N LA SALLE ST AND W RANDOLPH ST
.0
10/10/05
07/31/06
1,200 10/10/05
02/13/06
235
100
210 06 0240 / 4477
N LA SALLE ST AND W WASHINGTON ST
.0
10/10/05
07/31/06
1,500 10/10/05
02/13/06
235
100
210 06 0207 / 4450
N LOWER MICHIGAN AVE AND E GRAND AVE
.0
07/01/04
12/30/04
0 07/01/04
12/30/04
39
100
210 06 0207 / 4450
N MICHIGAN AVE AND E GRAND AVE
.0
07/01/04
12/30/04
0 07/01/04
12/30/04
39
100
210 06 0207 / 4450
N MICHIGAN AVE AND E OAK ST
.0
07/01/04
12/30/04
0 03/08/05
05/31/05
940
100
210 06 0207 / 4450
N MICHIGAN AVE AND E RANDOLPH ST
.0
07/01/04
12/30/04
0 09/02/04
09/10/04
920
100
210 06 0207 / 4450
N MICHIGAN AVE AND E WASHINGTON ST
.0
07/01/04
12/30/04
0 09/02/04
09/10/04
721
100
210 06 0207 / 4450
N PESHTIGO CT AND E GRAND AVE
.0
07/01/04
12/30/04
0 07/01/04
12/30/04
39
100
210 06 0207 / 4450
N PESHTIGO CT AND E ILLINOIS ST
.0
07/01/04
12/30/04
0 04/26/05
11/18/05
39
100
210 06 0023 / 4298
N RUSH ST AND E WALTON ST
.0
02/06/02
04/02/02
0 02/06/02
04/02/02
0
0
210 06 0207 / 4450
N ST CLAIR ST AND E GRAND AVE
.0
07/01/04
12/30/04
0 04/26/05
11/18/05
39
100
210 06 0207 / 4450
N STREETER DR AND E ILLINOIS ST
.0
07/01/04
12/30/04
0 04/26/05
11/18/05
39
100
210 06 0243 / 4480
N WABASH AVE AND E WASHINGTON ST
.0
12/27/06
01/26/07
500 12/27/06
01/26/07
1,912
100
210 06 0023 / 4298
N WELLS ST AND W HURON ST
.0
02/06/02
04/02/02
0 02/06/02
04/02/02
0
0
210 06 0207 / 4450
S MICHIGAN AVE AND E ADAMS ST
.0
07/01/04
12/30/04
500 09/02/04
09/10/04
137
100
210 06 0207 / 4450
S MICHIGAN AVE AND E JACKSON BLVD
.0
07/01/04
12/30/04
750 09/02/04
09/10/04
460
100
210 06 0207 / 4450
S MICHIGAN AVE AND E MONROE ST
.0
07/01/04
12/30/04
500 09/02/04
09/10/04
137
100
210 06 0243 / 4480
W ILLINOIS ST AND N LA SALLE DR
.0
07/07/07
07/16/07
1,135 07/14/07
07/15/07
0
0
300 06 0282 / 5390
345 E OHIO ST
1.0
12/15/04
01/10/05
2,000 12/01/04
01/03/05
1,805
100
300 06 0292 / 5399
26 E PEARSON ST
1.0
0
85
281 00 / 33670
206-232 E SUPERIOR ST
.0
01/01/08
12/31/08
300 06 0292 / 5399
300 N CANAL ST
1.0
03/30/05
05/11/05
5,000 03/30/05
05/11/05
300 06 0291 / 5398
401 N WABASH AVE
.0
10/01/04
12/31/04
54,192 10/01/04
300 06 0282 / 5390
747 N WABASH AVE
1.0
4,000 06/23/04
1,000 04/08/05 0
0
0
1,092
100
11/04/04
0
100
02/07/05
364
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 429
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering 300 06 0292 / 5399
330 W GRAND AVE
300 06 0292 / 5399
156 W SUPERIOR ST
Totals per Design/Engineering
Projects .0
01/20/05
12/21/05
0 01/20/05
08/05/05
0
100
1.0
02/10/05
05/26/05
3,000 02/10/05
05/26/05
0
100
6.0
77,477
11,951
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 430
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0042 / 5465
ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST
8.0
04/18/06
11/18/06
3,200
3,200
100
300 07 0042 / 5465
ON E CEDAR ST FROM N STATE ST TO N LAKE SHORE DR WEST
8.0
01/10/07
01/31/07
3,200
3,200
100
300 07 0042 / 5465
ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST
7.0
01/10/07
01/19/07
2,800
2,800
100
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W LAKE ST FROM N MILWAUKEE AVE TO N WEST WATER ST
4.0
01/10/07
01/31/07
6,000
6,000
100
300 07 0042 / 5465
ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR
2.0
01/10/07
01/31/07
800
800
100
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
Totals per 250 Watt Changeout Totals per Lighting/Electrical
29.0
16,000
16,000
3,524,651
4,193,749
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 431
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout
Fixtures
300 07 0042 / 5465
ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST
7.0
01/10/07
01/19/07
2,800
2,800
100
300 07 0042 / 5465
ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST
6.0
01/10/07
01/31/07
2,400
2,400
100
300 07 0042 / 5465
ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST
11.0
01/10/07
01/31/07
4,400
4,400
100
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST
7.0
01/10/07
01/31/07
2,800
2,800
100
300 07 0042 / 5465
ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST
5.0
01/10/07
01/31/07
1,200
1,200
100
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST
4.0
01/10/07
01/31/07
1,600
1,600
100
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
300 07 0042 / 5465
ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST
300 07 0042 / 5465 300 07 0042 / 5465
.0
03/01/06
12/31/06
0
0
0
6.50
01/10/07
01/31/07
2,600
2,600
100
ON W HUBBARD ST FROM N FRANKLIN ST TO N ORLEANS ST
7.0
01/10/07
01/31/07
2,900
2,900
100
ON W KINZIE ST FROM N ORLEANS ST TO N FRANKLIN ST
6.0
01/10/07
01/31/07
2,500
2,500
100
300 07 0042 / 5465
ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR
6.0
01/10/07
01/31/07
2,400
2,400
100
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
333 W HUBBARD ST
13.0
04/18/06
11/18/06
5,400
5,400
100
300 06 0069 / 5233
150 W OAK ST
3.0
01/27/03
01/27/03
1,200 01/24/03
1,125
100
01/24/03
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 432
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout Totals per 400 Watt Changeout
Fixtures 81.50
33,000
32,925
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 433
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0095 / 5777
ON N MICHIGAN AVE FROM E RANDOLPH ST TO E LAKE ST
2.0
500 05/31/00
05/31/00
947
100
302 00 0095 / 5777
ON W WACKER DR FROM N FRANKLIN ST TO N WELLS ST
9.0
2,000 05/29/01
05/30/01
4,154
100
302 00 0095 / 5777
70 E ADAMS ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
70 E JACKSON BLVD
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
6 E LAKE ST
1.0
302 00 0095 / 5777
30 E LAKE ST
9.0
6,750 08/01/97
08/30/97
7,732
100
302 00 0095 / 5777
67 E MADISON ST
6.0
4,500 03/31/03
04/02/03
6,640
100
302 00 0095 / 5777
71 E MADISON ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
18 N CLARK ST
3.0
2,250 10/23/02
10/29/02
1,200
100
805 06 0515 / 6701
36 N CLARK ST
1.0
0 12/20/96
12/20/96
300
100
302 00 0095 / 5777
220 N CLARK ST
4.0
3,000 10/23/02
10/29/02
1,500
100
302 00 0095 / 5777
1 N DEARBORN ST
25.0
18,750 02/24/03
02/27/03
13,892
100
805 06 1476 / 7662
1301 N DEARBORN ST
1.0
0 11/20/97
11/20/97
300
100
302 00 0095 / 5777
17 N FRANKLIN ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
18 N FRANKLIN ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
40 N FRANKLIN ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
150 N FRANKLIN ST
3.0
2,250 10/23/02
10/29/02
1,200
100
805 06 0834 / 7020
700 N FRANKLIN ST
1.0
05/24/96
05/24/96
0 05/24/96
05/24/96
300
100
805 06 0853 / 7039
720 N FRANKLIN ST
1.0
05/29/96
05/29/96
0 05/29/96
05/29/96
300
100
302 00 0095 / 5777
18 N LA SALLE ST
1.0
750 10/23/02
10/29/02
400
100
302 00 0095 / 5777
33 N LA SALLE ST
4.0
3,000 01/16/03
01/22/03
3,532
100
302 00 0095 / 5777
120 N LA SALLE ST
18.0
13,500 10/15/01
10/15/01
9,737
100
300 06 0096 / 5258
121 N LA SALLE ST
300.0
0 03/01/06
09/01/06
9,064
0
302 00 0092 / 5774
121 N LA SALLE ST
33.0
0 02/13/01
01/21/02
7,776
100
302 00 0095 / 5777
18 N MICHIGAN AVE
3.0
2,250 10/23/02
10/29/02
1,200
100
302 00 0095 / 5777
40 N MICHIGAN AVE
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
150 N MICHIGAN AVE
3.0
2,250 10/23/02
10/29/02
1,200
100
302 00 0095 / 5777
360 N MICHIGAN AVE
2.0
1,500 10/11/00
10/11/00
947
100
805 06 0449 / 6635
1300 N STATE ST
1.0
0 11/15/96
11/15/96
300
100
302 00 0095 / 5777
151 N WABASH AVE
2.0
1,500 10/23/02
10/29/02
800
100
302 00 0095 / 5777
221 N WABASH AVE
2.0
1,500 10/23/02
10/29/02
1,000
100
750
12/20/96
11/20/97
03/01/03
11/15/96
12/20/96
11/20/97
09/01/03
11/15/96
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 434
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0095 / 5777
18 N WELLS ST
3.0
2,250 10/23/02
10/29/02
1,200
100
302 00 0095 / 5777
40 N WELLS ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
150 N WELLS ST
1.0
750 10/23/02
10/29/02
400
100
302 00 0095 / 5777
221 N WELLS ST
2.0
1,500 10/23/02
10/29/02
1,000
100
302 00 0095 / 5777
135 S LA SALLE ST
4.0
3,000 06/02/99
06/04/99
3,605
100
302 00 0095 / 5777
18 S MICHIGAN AVE
26.0
19,500 02/28/03
03/12/03
23,681
100
300 06 0078 / 5241
122 S MICHIGAN AVE
17.0
12/23/02
12/31/02
15,700 12/23/02
12/31/02
15,694
100
300 06 0225 / 5340
220 S MICHIGAN AVE
4.0
12/18/02
12/20/02
7,750 12/18/02
12/20/02
7,740
100
300 06 0078 / 5241
211 S STATE ST
14.0
10/29/02
11/06/02
14,850 10/29/02
11/06/02
14,831
100
300 06 0225 / 5340
211 S STATE ST
8.0
10/30/02
10/31/02
6,341 10/30/02
10/31/02
6,340
100
302 00 0095 / 5777
30 S WABASH AVE
5.0
3,750 03/13/03
03/14/03
5,129
100
805 06 0697 / 6883
58 W ERIE ST
1.0
0 11/06/96
11/06/96
300
100
302 00 0092 / 5774
501 W HURON ST
1.0
0 01/17/02
01/17/02
236
100
302 00 0095 / 5777
50 W LAKE ST
4.0
3,000 07/21/97
08/08/97
2,986
100
302 00 0095 / 5777
40-42 W MARBLE PL
15.0
11,250 03/17/03
03/28/03
12,754
100
302 00 0095 / 5777
22 W MONROE ST
12.0
9,000 12/16/97
12/26/97
10,237
100
805 06 0607 / 6793
63 W ONTARIO ST
1.0
0 11/29/96
11/29/96
300
100
302 00 0095 / 5777
190 W RANDOLPH ST
4.0
3,000 07/21/97
08/08/97
2,986
100
302 00 0095 / 5777
205 W RANDOLPH ST
4.0
3,000 03/23/00
03/24/00
1,926
100
300 06 0166 / 5305
4-36 W TOOKER PL
5.0
1,679 04/01/00
04/21/00
1,678
100
302 00 0095 / 5777
41 W WACKER DR
3.0
2,250 10/23/02
10/29/02
1,200
100
805 06 1798 / 7984
60 W WALTON ST
1.0
04/10/97
04/10/97
0 04/10/97
04/10/97
300
100
302 00 0095 / 5777
69 W WASHINGTON ST
11.0
12/06/02
12/11/02
8,250 12/06/02
12/11/02
10,477
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
121 N LA SALLE ST
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
121 N LA SALLE ST
11/06/96
11/29/96
04/01/00
11/06/96
11/29/96
04/21/00
597.0
195,820
207,421
Lamps 3,803.0
06/01/07
12/31/07
111,960 07/01/07
01/01/08
108,575
100
0 11/01/02
12/31/02
65,690
100
Installations 2,165.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 435
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N PARK DR FROM E NORTH WATER ST TO E ILLINOIS ST
2.0
01/10/07
01/31/07
1,000
1,000
100
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W MADISON ST FROM WACKER DR TO CANAL ST
1.0
01/10/07
01/31/07
500
500
100
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W WASHINGTON ST FROM N WACKER DR TO N RIVERSIDE PLZ
2.0
01/10/07
01/31/07
1,000
100
100
302 00 0092 / 5774
12 W WASHINGTON ST
2.0
0 07/09/01
07/09/01
941
100
302 00 0092 / 5774
26 W WASHINGTON ST
2.0
0 07/09/01
07/09/01
941
100
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
206-232 E SUPERIOR ST
9.0
2,500
3,482
0
0
Blocks .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 436
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 06 0282 / 5390
345 E OHIO ST
281 00 / 33670
206-232 E SUPERIOR ST
300 06 0292 / 5399
Installations 1.0
01/14/05
01/16/05
.0
01/01/08
12/31/08
300 N CANAL ST
1.0
09/01/05
300 06 0282 / 5390
747 N WABASH AVE
1.0
81,000 12/01/04
300 06 0292 / 5399
330 W GRAND AVE
1.0
45,000 08/01/05
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts
8,000 01/14/05
01/16/05
0
100
0
0
48,836
100
09/13/05
68,596
100
10/14/05
38,546
100
48,415 12/28/06
4.0
6,662
182,415
162,640
Projects
300 06 0199 / 5324
ON N WABASH AVE FROM E CHESTNUT ST TO E DELAWARE PL
1.0
32,573 10/04/99
11/10/99
24,412
100
150 06 0068 / 2139
ON W WACKER DR FROM N STATE ST TO N WELLS ST
1.0
0 11/15/98
12/31/99
17,879
100
300 06 0292 / 5399
156 W SUPERIOR ST
0 06/17/05
06/09/06
0
100
Totals per Lighting Imprvmnts
Work Type: Loop Lighting 281 00 / 33670
206-232 E SUPERIOR ST
.0
03/01/05
12/31/05
2.0
32,573
42,291
0
0
Blocks .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 437
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting
Fixtures
300 11 / 32231
ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL
25.0
03/08/08
03/08/08
38,636
100
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 06 0122 / 5275
ON W NORTH AVE FROM N WELLS ST TO N CLARK ST
4.55
08/20/03
08/25/03
5,670 08/19/03
08/25/03
5,267
100
300 06 0122 / 5275
ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY
6.50
08/20/03
08/25/03
8,100 08/19/03
08/22/03
15,048
100
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
333 W HUBBARD ST
7.0
04/18/06
11/18/06
9,450
9,450
100
56,970
68,401
Totals per Ornamental - Piggyback Lighting
43.05
33,750 07/09/08
07/09/08
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 438
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental Lighting
Blocks
300 06 0188 / 5313
ON E CHESTNUT ST FROM N RUSH ST TO N WABASH AVE
.50
06/01/02
12/01/02
69,500 05/28/02
12/27/02
49,622
100
300 06 0188 / 5313
ON E PEARSON ST FROM N RUSH ST TO N WABASH AVE
.50
06/01/02
12/01/02
69,500 05/28/02
12/27/02
49,622
100
300 06 0132 / 5285
ON N FRANKLIN ST FROM W HURON ST TO W CHICAGO AVE
1.0
125,000 05/01/00
05/19/00
49,188
100
300 06 0073 / 5236
ON N RUSH ST FROM E CHESTNUT ST TO E CEDAR ST
3.0
08/03/98
09/28/01
1,700,000 08/03/98
05/20/02
1,173,525
100
300 06 0188 / 5313
ON N RUSH ST FROM E CHESTNUT ST TO E PEARSON ST
.50
06/01/02
12/01/02
69,500 05/28/02
12/27/02
49,622
100
300 06 0188 / 5313
ON N WABASH AVE FROM E CHESTNUT ST TO E PEARSON ST
.50
06/01/02
12/01/02
69,500 05/28/02
12/27/02
49,623
100
302 00 0043 / 5753
ON W WACKER DR FROM N STATE ST TO N FRANKLIN ST
300 11 / 32231
N DEARBORN PKWY AND W NORTH BLVD
1.0
03/08/08
07/09/08
36,000 03/08/08
07/09/08
38,636
100
300 11 / 32231
N DEARBORN ST AND W GOETHE ST
1.0
03/08/08
07/09/08
30,000 03/08/08
07/09/08
38,636
100
300 11 / 32231
W BURTON PL AND N DEARBORN ST
1.0
03/08/08
07/09/08
36,000 03/08/08
07/09/08
38,636
100
281 00 / 33670
206-232 E SUPERIOR ST
.0
01/01/08
12/31/08
0
0
0
2,205,000
1,537,110
Totals per Ornamental Lighting
Work Type: POD Camera Pole 281 00 / 33670
206-232 E SUPERIOR ST
Work Type: Residential Regrouping 300 06 0270 / 5378
311 W SUPERIOR ST
Work Type: Residntl Staggered Lighting
0
3.50
12.50
0
Poles .0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Lamps .0
Blocks
300 06 0298 / 5405
ON N DEARBORN ST FROM W CHICAGO AVE TO W OAK ST
2.0
11/01/05
12/15/05
0 10/10/05
11/18/05
144,313
100
300 06 0308 / 5414
ON N DEARBORN ST FROM W OAK ST TO W DIVISION ST
2.0
03/16/06
12/31/06
209,566 10/06/06
11/17/06
135,535
100
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
4.0
209,566
279,848
Blocks
300 06 0166 / 5305
ON W CHESTNUT ST FROM N STATE ST TO N DEARBORN ST
.50
04/01/00
04/21/00
1,679 04/01/00
04/21/00
1,678
100
300 06 0235 / 5349
ON W OAK ST FROM N LA SALLE ST TO N DEARBORN ST
2.0
09/15/03
10/30/03
85,094 08/18/03
10/17/03
146,995
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
206-232 E SUPERIOR ST
2.50
86,773
148,673
0
0
Locations .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 439
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl 281 00 / 33670
206-232 E SUPERIOR ST
Locations .0
01/01/08
12/31/08
0
0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 440
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 06 0081 / 5244
ON E ADAMS ST FROM S STATE ST TO S MICHIGAN AVE
27.0
05/02/98
05/03/98
1,715 05/02/98
05/03/98
1,715
100
300 07 0042 / 5465
ON E BELLEVUE PL FROM N STATE ST TO N LAKE SHORE DR WEST
8.0
04/18/06
11/18/06
1,600 04/18/06
11/18/06
1,600
100
300 07 0042 / 5465
ON E ELM ST FROM N STATE ST TO N LAKE SHORE DR WEST
7.0
04/18/06
11/18/06
1,750 08/14/06
09/01/06
1,382
100
300 06 0081 / 5244
ON E MADISON ST FROM S STATE ST TO N MICHIGAN AVE
20.0
0 05/09/98
05/10/98
1,270
100
300 06 0081 / 5244
ON E MONROE ST FROM S STATE ST TO S MICHIGAN AVE
20.0
0 05/09/98
05/10/98
1,270
100
300 06 0081 / 5244
ON E WASHINGTON ST FROM N STATE ST TO N MICHIGAN AVE
20.0
0 05/16/98
05/17/98
1,270
100
300 07 0042 / 5465
ON N COLUMBUS DR FROM E WACKER DR TO E NORTH WATER ST
300 11 / 32231
6.0
04/18/06
11/18/06
1,500 08/14/06
09/01/06
1,185
100
ON N DEARBORN ST FROM W DIVISION ST TO W BURTON PL
25.0
03/08/08
07/09/08
7,500 03/08/08
07/09/08
5,000
100
300 07 0042 / 5465
ON N DEARBORN ST FROM W ERIE ST TO W ONTARIO ST
11.0
04/18/06
11/18/06
2,750 08/14/06
09/01/06
2,172
100
302 00 0076 / 5764
ON N DEARBORN ST FROM W MADISON ST TO W WACKER DR
48.0
09/01/00
12/31/00
0
816
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0043 / 5466
ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE
14.50
04/18/06
11/18/06
3,625 08/04/06
09/01/06
0
100
300 07 0042 / 5465
ON N LAKE SHORE DR WEST FROM E ERIE ST TO E ONTARIO ST
7.0
04/18/06
11/18/06
1,750 08/14/06
09/01/06
1,381
100
300 07 0042 / 5465
ON N MIES VAN DER ROHE WAY FROM E CHICAGO AVE TO E WALTON ST
3.0
04/18/06
01/31/07
600 08/14/06
09/01/06
592
100
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
300 06 0081 / 5244
ON N ORLEANS ST FROM W HUBBARD ST TO W CHICAGO AVE
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
302 00 0076 / 5764
ON N RUSH ST FROM E SUPERIOR ST TO E CHICAGO AVE
4.0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
300 06 0081 / 5244
ON N STATE ST FROM E MADISON ST TO W WACKER DR
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
4,505
100
0
0
0
0
0
0
12/31/06
0
0
0
09/01/00
12/31/00
0
68
03/01/06
12/31/06
0
70.0
0 0 05/12/98
4.0
05/17/98
0
0
254
100
0
0
0
0
0
0
0
0
0
0 05/23/98
05/23/98
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 441
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 06 0081 / 5244
ON S CLARK ST FROM W MADISON ST TO W VAN BUREN ST
300 06 0081 / 5244 300 06 0081 / 5244 300 06 0081 / 5244
ON S WABASH AVE FROM E MADISON ST TO E BALBO AVE
300 06 0081 / 5244
0
37.0
0 05/17/98
05/23/98
2,350
100
ON S LA SALLE ST FROM W MADISON ST TO W VAN BUREN ST
23.50
0 05/13/98
05/16/98
1,493
100
ON S STATE ST FROM E MADISON ST TO W CONGRESS PKWY
4.0
0 05/23/98
05/23/98
254
100
55.90
0 05/08/98
05/17/98
3,598
100
ON S WABASH AVE FROM E MADISON ST TO E CONGRESS PKWY
4.80
0 05/23/98
05/23/98
305
100
300 06 0081 / 5244
ON W ADAMS ST FROM S STATE ST TO S JEFFERSON ST
50.0
0 04/25/98
05/03/98
3,175
100
300 06 0081 / 5244
ON W CHICAGO AVE FROM N DEARBORN ST TO N LA SALLE DR
12.0
0 05/23/98
05/23/98
762
100
300 03 0042 / 4913
ON W DELAWARE PL FROM N CLARK ST TO N LA SALLE DR
300 07 0042 / 5465 300 06 0081 / 5244 300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
300 07 0042 / 5465
3.0
03/01/05
03/01/05
ON W ERIE ST FROM N DEARBORN ST TO N CLARK ST
4.0
04/18/06
11/18/06
ON W ERIE ST FROM N LA SALLE DR TO N ORLEANS ST
15.0 .0
03/01/06
12/31/06
ON W GRAND AVE FROM N KINGSBURY ST TO N DESPLAINES ST
6.50
04/18/06
11/18/06
300 06 0081 / 5244
ON W HUBBARD ST FROM N STATE ST TO N WELLS ST
300 06 0081 / 5244
ON W HURON ST FROM N LA SALLE DR TO N ORLEANS ST
300 06 0081 / 5244
ON W KINZIE ST FROM N STATE ST TO N WELLS ST
300 06 0081 / 5244
ON W MADISON ST FROM S STATE ST TO S DESPLAINES ST
300 07 0042 / 5465
ON W MADISON ST FROM WACKER DR TO CANAL ST
2.0
04/18/06
300 07 0042 / 5465
ON W MAPLE ST FROM N STATE ST TO N DEARBORN ST
2.0
300 07 0042 / 5465
ON W MAPLE ST FROM N STATE ST TO N LA SALLE DR
6.0
300 06 0081 / 5244
ON W MONROE ST FROM S STATE ST TO S JEFFERSON ST
45.0
300 06 0108 / 5263
ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST
8.50
07/01/03
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
300 06 0081 / 5244
ON W SUPERIOR ST FROM N LA SALLE DR TO N ORLEANS ST
300 06 0081 / 5244 300 06 0081 / 5244
600
0
1,000 08/14/06
09/01/06
791
100
0 05/17/98
05/17/98
952
100
0
0
0
1,625 08/14/06
09/01/06
1,283
100
23.0
0 05/16/98
05/17/98
1,461
100
13.0
0 05/17/98
05/17/98
825
100
22.0
0 05/16/98
05/17/98
1,397
100
44.50
0 05/04/98
05/10/98
2,826
100
11/18/06
500 08/14/06
09/01/06
395
100
04/18/06
11/18/06
400 08/14/06
09/01/06
395
100
04/18/06
11/18/06
1,500 08/14/06
09/01/06
1,185
100
0 05/04/98
05/10/98
2,858
100
07/07/03
2,000 06/20/03
06/30/03
1,925
100
12/31/06
0 03/01/06
12/31/06
0
0
11.0
0 05/17/98
05/17/98
698
100
44 E ONTARIO ST
5.0
0 05/22/98
05/22/98
317
100
65 E ONTARIO ST
5.0
0 05/23/98
05/23/98
317
100
300 06 0081 / 5244
200 E ONTARIO ST
22.0
0 05/21/98
05/22/98
1,397
100
300 06 0081 / 5244
300 E ONTARIO ST
7.0
0 05/22/98
05/22/98
444
100
302 00 0076 / 5764
400-430 N LA SALLE ST
4.0
09/01/00
12/31/00
300 07 0042 / 5465
333 W HUBBARD ST
9.0
04/18/06
11/18/06
0 2,250 04/18/06
68 11/18/06
2,250
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 442
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting 300 06 0081 / 5244
1-630 W WASHINGTON BLVD
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 281 00 / 33670
206-232 E SUPERIOR ST
Work Type: Strt Lighting 302 00 0071 / 5759
ON W LAKE ST FROM N WELLS ST TO N FRANKLIN ST
300 06 0117 / 5271
ON W WACKER DR FROM N STATE ST TO N ORLEANS ST
300 06 0291 / 5398
401 N WABASH AVE
303 00 0006 / 5783
540 W LAKE ST
90.0
0 05/02/98
831.20
Work Type: Traffic Signal Regrouping 121 N LA SALLE ST
05/17/98
5,715
33,315
64,309
0
0
0
247,621
100
Blocks .0
01/01/08
12/31/08
0
Blocks 30,000 .0
24,000
12/01/04
02/28/05
67,142 01/03/05
03/22/05
60,640
100
08/01/97
12/01/97
60,000 08/01/97
04/30/98
76,547
100
.0
Totals per Strt Lighting
300 06 0139 / 5289
Locations
157,142
408,808
Lamps 945.0
03/01/04
12/01/04
4,914 10/27/06
11/27/06
10,291
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 443
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting 302 00 0073 / 5761
ON E HUBBARD ST FROM N RUSH ST TO N WABASH AVE
302 00 0073 / 5761
ON N WABASH AVE FROM E WACKER DR TO E GRAND AVE
805 06 2255 / 8441
44 E ADAMS ST
805 06 2649 / 8835
Fixtures 22.0
06/01/00
10/31/01
76,562 07/19/01
15,742
100
171.0
06/01/00
10/31/01
76,564 04/16/01
122,366
100
4.0
12/31/93
12/31/93
0 12/31/93
12/31/93
3,000
100
134 E GRAND AVE
28.0
01/01/92
01/01/92
0 01/01/92
01/01/92
21,000
100
805 06 2627 / 8813
498 E GRAND AVE
32.0
01/01/93
01/01/93
0 01/01/93
01/01/93
24,000
100
805 06 2578 / 8764
134 E ILLINOIS ST
28.0
01/01/92
01/01/92
0 01/01/92
01/01/92
21,000
100
805 06 2402 / 8588
520 E ILLINOIS ST
32.0
01/01/92
01/01/92
0 01/01/92
01/01/92
24,000
100
300 06 0207 / 5330
150 N COLUMBUS DR
66.0
805 06 2927 / 9113
435 N DESPLAINES ST
14.0
302 00 0070 / 5758 302 00 0070 / 5758 805 06 2119 / 8305
600 N KINGSBURY ST
300 06 0217 / 5337
121 N LA SALLE ST
302 00 0072 / 5760
220 N MILWAUKEE AVE
1.0
805 06 2906 / 9092
220 N MILWAUKEE AVE
18.0
302 00 0070 / 5758
1 S STATE ST
805 06 2278 / 8464
201 W ADAMS ST
4.0
12/31/93
12/31/93
0 12/31/93
12/31/93
3,000
100
805 06 2903 / 9089
501 W FULTON ST
16.0
02/22/94
02/22/94
0 02/22/94
02/22/94
12,000
100
805 06 2902 / 9088
628 W HUBBARD ST
24.0
12/01/93
12/01/93
0 12/01/93
12/01/93
18,000
100
805 06 2275 / 8461
405 W KINZIE ST
12.0
12/31/94
12/31/94
0 12/31/94
12/31/94
9,000
100
805 06 2276 / 8462
405 W KINZIE ST
12.0
12/31/94
12/31/94
0 12/31/94
12/31/94
9,000
100
805 06 2904 / 9090
534 W KINZIE ST
23.0
11/17/93
11/17/93
0 11/17/93
11/17/93
17,250
100
805 06 2235 / 8421
501 W LAKE ST
42.0
04/17/96
04/17/96
0 04/17/96
04/17/96
31,500
100
805 06 2855 / 9041
505 W RANDOLPH ST
42.0
01/30/93
01/30/93
0 01/30/93
01/30/93
31,500
100
805 06 2246 / 8432
505 W WASHINGTON BLVD
98.0
05/19/96
05/19/96
0 05/19/96
05/19/96
73,500
100
0 10/25/01 12/01/93
95
10,500
100
0 12/01/93
12/01/93
320 N JEFFERSON ST
0 12/31/97
01/06/98
6,439
100
600 N KINGSBURY ST
0 06/24/97
07/02/97
10,451
100
Totals per Underpass Lighting
12/01/93
59,080
17.0
07/02/97
07/02/97
0 07/02/97
07/02/97
12,750
100
544.0
06/07/04
06/14/04
30,577 07/26/04
08/09/04
10,880
100
0 10/28/99
12/29/99
23,017
100
0 07/29/94
07/29/94
13,500
100
07/29/94
07/29/94
0
1,250.0
183,703
441,811
1,024,286
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 444
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Locations
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W FULTON ST FROM N CANAL ST TO N CLINTON ST
6.0
04/18/06
11/18/06
6,000
6,000
100
300 07 0042 / 5465
ON W KINZIE ST FROM N CANAL ST TO N CLINTON ST
7.0
04/18/06
11/18/06
7,000
7,000
100
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
13,000
13,000
Totals per Underpass Lighting
13.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 445
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
E GRAND AVE AND N WABASH AVE
1.0
210 06 0175 / 4423
E ILLINOIS ST AND N STREETER DR
1.0
210 06 0130 / 4389
E MONROE ST AND S WABASH AVE
210 06 0130 / 4389
0 11/04/02
11/04/02
7,324
100
10,000 04/03/03
04/03/03
10,663
100
1.0
0 10/03/01
10/03/01
7,552
100
E ONTARIO ST AND N WABASH AVE
1.0
0 09/04/02
09/04/02
7,324
100
210 06 0130 / 4389
N CLARK ST AND W CHICAGO AVE
1.0
0 04/08/02
04/08/02
8,091
100
210 06 0130 / 4389
N CLARK ST AND W GRAND AVE
1.0
0 11/11/01
11/11/01
6,108
100
210 06 0130 / 4389
N CLARK ST AND W HUBBARD ST
1.0
0 11/11/01
11/11/01
3,677
100
210 06 0130 / 4389
N CLARK ST AND W HURON ST
1.0
0 11/08/01
11/08/01
7,324
100
210 06 0130 / 4389
N CLARK ST AND W ILLINOIS ST
1.0
0 11/11/01
11/11/01
6,108
100
210 06 0130 / 4389
N CLARK ST AND W KINZIE ST
1.0
0 11/12/01
11/12/01
7,324
100
210 06 0130 / 4389
N CLARK ST AND W LAKE ST
1.0
0 10/21/01
10/21/01
7,324
100
210 06 0130 / 4389
N CLARK ST AND W OHIO ST
1.0
0 11/11/01
11/11/01
7,552
100
210 06 0130 / 4389
N CLARK ST AND W ONTARIO ST
1.0
0 11/08/01
11/08/01
6,108
100
210 06 0130 / 4389
N CLARK ST AND W RANDOLPH ST
1.0
0 10/11/01
10/11/01
6,108
100
210 06 0130 / 4389
N CLARK ST AND W WASHINGTON ST
1.0
0 09/17/01
09/17/01
6,108
100
210 06 0130 / 4389
N CLINTON ST AND W LAKE ST
1.0
0 11/21/01
11/21/01
8,134
100
210 06 0175 / 4423
N COLUMBUS DR AND E NORTH WATER ST
1.0
16,000 12/30/03
12/31/03
13,613
100
210 06 0130 / 4389
N DEARBORN ST AND W ERIE ST
1.0
0 11/13/01
11/13/01
3,522
100
210 06 0130 / 4389
N DEARBORN ST AND W GRAND AVE
1.0
0 11/13/01
11/13/01
6,108
100
210 06 0130 / 4389
N DEARBORN ST AND W HURON ST
1.0
0 11/13/01
11/13/01
6,108
100
210 06 0130 / 4389
N DEARBORN ST AND W ILLINOIS ST
1.0
0 11/13/01
11/13/01
6,108
100
210 06 0130 / 4389
N DEARBORN ST AND W KINZIE ST
1.0
0 11/13/01
11/13/01
7,324
100
210 06 0130 / 4389
N DEARBORN ST AND W LAKE ST
1.0
0 10/21/01
10/21/01
9,367
100
210 06 0130 / 4389
N DEARBORN ST AND W OHIO ST
1.0
0 11/14/01
07/25/02
5,423
90
210 06 0130 / 4389
N DEARBORN ST AND W ONTARIO ST
1.0
0 11/14/01
11/14/01
5,651
100
210 06 0130 / 4389
N DEARBORN ST AND W RANDOLPH ST
1.0
0 10/11/01
10/11/01
6,285
100
210 06 0130 / 4389
N DEARBORN ST AND W SUPERIOR ST
1.0
0 11/14/01
11/14/01
3,065
100
210 06 0130 / 4389
N DEARBORN ST AND W WASHINGTON ST
1.0
0 09/18/01
09/18/01
6,513
100
210 06 0130 / 4389
N FAIRBANKS CT AND E GRAND AVE
1.0
0 10/31/01
10/31/01
4,384
90
210 06 0175 / 4423
N FAIRBANKS CT AND E OHIO ST
1.0
01/02/04
01/02/04
12,000 01/08/04
01/08/04
13,958
100
210 06 0175 / 4423
N FAIRBANKS CT AND E ONTARIO ST
1.0
01/03/04
01/03/04
10,000 01/07/04
01/07/04
13,392
100
04/03/03
01/01/04
05/03/03
01/01/04
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 446
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N FRANKLIN ST AND W GRAND AVE
1.0
0 05/23/02
05/23/02
10,160
100
210 06 0130 / 4389
N FRANKLIN ST AND W LAKE ST
1.0
0 10/16/01
10/16/01
5,880
100
210 06 0130 / 4389
N FRANKLIN ST AND W OHIO ST
1.0
0 05/28/02
05/28/02
3,117
100
210 06 0130 / 4389
N FRANKLIN ST AND W ONTARIO ST
1.0
0 05/29/02
05/29/02
6,638
100
210 06 0130 / 4389
N FRANKLIN ST AND W RANDOLPH ST
1.0
0 10/15/01
10/15/01
6,513
100
210 06 0130 / 4389
N FRANKLIN ST AND W WASHINGTON ST
1.0
0 09/16/01
09/16/01
6,108
100
210 06 0175 / 4423
N KINGSBURY ST AND W GRAND AVE
1.0
12,000 12/22/03
12/22/03
13,096
100
210 06 0130 / 4389
N LA SALLE ST AND W CHICAGO AVE
1.0
0 04/09/02
04/09/02
9,349
100
210 06 0130 / 4389
N LA SALLE ST AND W ERIE ST
1.0
0 11/07/01
11/07/01
8,539
100
210 06 0130 / 4389
N LA SALLE ST AND W GRAND AVE
1.0
0 11/06/01
11/06/01
8,496
100
210 06 0130 / 4389
N LA SALLE ST AND W HUBBARD ST
1.0
0 11/05/01
11/05/01
8,539
100
210 06 0130 / 4389
N LA SALLE ST AND W HURON ST
1.0
0 11/07/01
11/07/01
7,324
100
210 06 0130 / 4389
N LA SALLE ST AND W ILLINOIS ST
1.0
0 11/06/01
11/06/01
5,246
100
210 06 0130 / 4389
N LA SALLE ST AND W LAKE ST
1.0
0 10/18/01
10/18/01
8,539
100
210 06 0130 / 4389
N LA SALLE ST AND W OHIO ST
1.0
0 11/06/01
06/12/02
9,711
100
210 06 0130 / 4389
N LA SALLE ST AND W ONTARIO ST
1.0
0 06/13/02
06/13/02
6,190
100
210 06 0130 / 4389
N LA SALLE ST AND W RANDOLPH ST
1.0
0 10/11/01
10/11/01
7,729
100
210 06 0130 / 4389
N LA SALLE ST AND W SUPERIOR ST
1.0
0 11/07/01
11/07/01
7,729
100
210 06 0130 / 4389
N LA SALLE ST AND W WASHINGTON ST
1.0
0 09/17/01
09/17/01
7,729
100
210 06 0175 / 4423
N MCCLURG CT AND E OHIO ST
1.0
01/10/04
01/10/04
11,000 12/30/03
12/31/03
9,560
100
210 06 0175 / 4423
N MCCLURG CT AND E ONTARIO ST
1.0
01/02/04
01/02/04
10,000 12/30/03
12/31/03
9,921
100
210 06 0130 / 4389
N MICHIGAN AVE AND E CHICAGO AVE
1.0
0 04/01/02
04/01/02
13,397
100
210 06 0175 / 4423
N MICHIGAN AVE AND E ERIE ST
1.0
06/11/03
06/12/03
14,000 05/28/03
05/29/03
15,066
100
210 06 0175 / 4423
N MICHIGAN AVE AND E GRAND AVE
2.0
06/19/03
01/03/04
24,000 05/08/03
01/23/04
23,372
100
210 06 0175 / 4423
N MICHIGAN AVE AND E HURON ST
1.0
06/09/03
06/10/03
16,000 05/30/03
05/30/03
14,205
100
210 06 0175 / 4423
N MICHIGAN AVE AND E ILLINOIS ST
1.0
06/20/03
06/23/03
11,000 05/09/03
05/12/03
12,402
100
210 06 0130 / 4389
N MICHIGAN AVE AND E LAKE ST
1.0
0 10/23/01
10/23/01
12,522
100
210 06 0175 / 4423
N MICHIGAN AVE AND E OHIO ST
1.0
06/17/03
06/18/03
15,000 05/13/03
05/15/03
15,650
100
210 06 0175 / 4423
N MICHIGAN AVE AND E ONTARIO ST
1.0
06/13/03
06/16/03
16,000 05/16/03
05/19/03
16,126
100
210 06 0130 / 4389
N MICHIGAN AVE AND E RANDOLPH ST
1.0
0 10/16/01
10/16/01
15,069
100
210 06 0175 / 4423
N MICHIGAN AVE AND E SUPERIOR ST
1.0
15,000 06/02/03
06/05/03
16,936
100
01/04/04
06/05/03
01/04/04
06/06/03
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 447
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N MICHIGAN AVE AND E WASHINGTON ST
1.0
0 09/20/01
09/20/01
8,944
100
210 06 0130 / 4389
N ORLEANS ST AND W CHICAGO AVE
.50
0 04/12/02
04/12/02
3,953
100
210 06 0130 / 4389
N ORLEANS ST AND W GRAND AVE
1.0
0 05/13/02
05/13/02
9,306
100
210 06 0130 / 4389
N ORLEANS ST AND W HURON ST
1.0
0 10/30/01
10/30/01
5,953
100
210 06 0130 / 4389
N ORLEANS ST AND W ILLINOIS ST
1.0
0 05/10/02
05/10/02
8,082
100
210 06 0130 / 4389
N ORLEANS ST AND W MERCHANDISE MART PLZ
1.0
0 04/12/02
04/12/02
6,513
100
210 06 0130 / 4389
N ORLEANS ST AND W OHIO ST
1.0
0 05/13/02
05/13/02
5,195
100
210 06 0130 / 4389
N ORLEANS ST AND W SUPERIOR ST
1.0
0 05/02/02
05/02/02
9,806
100
210 06 0175 / 4423
N PESHTIGO CT AND E GRAND AVE
1.0
01/05/04
01/05/04
14,000 01/14/04
01/14/04
10,966
100
210 06 0175 / 4423
N PESHTIGO CT AND E ILLINOIS ST
1.0
06/04/03
06/05/03
9,000 06/12/03
06/12/03
7,032
100
210 06 0175 / 4423
N RUSH ST AND E GRAND AVE
1.0
04/18/03
04/21/03
12,000 04/18/03
04/21/03
13,022
100
210 06 0175 / 4423
N RUSH ST AND E ILLINOIS ST
1.0
04/22/03
04/23/03
12,000 04/22/03
04/23/03
13,251
100
210 06 0175 / 4423
N RUSH ST AND E OHIO ST
1.0
04/24/03
04/25/03
10,000 04/24/03
04/25/03
10,977
100
210 06 0175 / 4423
N RUSH ST AND E ONTARIO ST
1.0
04/25/03
04/28/03
10,000 04/25/03
04/28/03
10,977
100
210 06 0175 / 4423
N ST CLAIR ST AND E GRAND AVE
1.0
04/29/03
04/29/03
10,000 04/29/03
04/29/03
11,135
100
210 06 0175 / 4423
N ST CLAIR ST AND E HURON ST
1.0
04/30/03
05/01/03
12,000 05/01/03
05/01/03
13,251
100
210 06 0175 / 4423
N ST CLAIR ST AND E OHIO ST
1.0
01/07/04
01/07/04
14,000 12/23/03
12/23/03
12,086
100
210 06 0175 / 4423
N ST CLAIR ST AND E ONTARIO ST
1.0
01/08/04
01/08/04
16,000 12/31/03
12/31/03
11,320
100
210 06 0130 / 4389
N STATE ST AND E BELLEVUE PL
1.0
0 05/02/02
05/02/02
8,539
100
210 06 0175 / 4423
N STREETER DR AND E ILLINOIS ST
1.0
11,000 04/11/03
04/14/03
12,353
100
210 06 0130 / 4389
N WABASH AVE AND E CHICAGO AVE
1.0
0 04/04/02
04/04/02
8,539
100
210 06 0130 / 4389
N WABASH AVE AND E LAKE ST
1.0
0 10/23/01
10/23/01
6,513
100
210 06 0130 / 4389
N WABASH AVE AND E NORTH WATER ST
1.0
0 11/04/02
11/04/02
7,625
100
210 06 0130 / 4389
N WABASH AVE AND E RANDOLPH ST
1.0
0 10/14/01
10/14/01
10,970
100
210 06 0130 / 4389
N WABASH AVE AND E WASHINGTON ST
1.0
0 09/19/01
09/19/01
6,918
100
210 06 0130 / 4389
N WELLS ST AND W CHICAGO AVE
.50
0 04/10/02
04/10/02
4,270
100
210 06 0130 / 4389
N WELLS ST AND W GRAND AVE
1.0
0 11/01/01
11/01/01
7,324
100
210 06 0130 / 4389
N WELLS ST AND W HUBBARD ST
1.0
0 11/01/01
11/01/01
7,095
100
210 06 0130 / 4389
N WELLS ST AND W ILLINOIS ST
1.0
0 11/01/01
11/01/01
6,108
100
210 06 0130 / 4389
N WELLS ST AND W KINZIE ST
1.0
0 11/01/01
11/01/01
8,539
100
210 06 0130 / 4389
N WELLS ST AND W LAKE ST
1.0
0 10/17/01
10/17/01
7,677
100
04/11/03
04/14/03
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 448
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N WELLS ST AND W OHIO ST
1.0
0 05/30/02
05/30/02
3,751
100
210 06 0130 / 4389
N WELLS ST AND W ONTARIO ST
1.0
0 11/05/01
11/05/01
4,893
100
210 06 0130 / 4389
N WELLS ST AND W RANDOLPH ST
1.0
0 10/16/01
10/16/01
7,324
100
210 06 0130 / 4389
N WELLS ST AND W WASHINGTON ST
1.0
0 09/17/01
09/17/01
6,513
100
210 06 0130 / 4389
S CLARK ST AND W ADAMS ST
1.0
0 10/02/01
10/02/01
6,513
100
210 06 0130 / 4389
S CLARK ST AND W JACKSON BLVD
.50
0 10/09/01
10/09/01
3,257
100
210 06 0130 / 4389
S COLUMBUS DR AND E BALBO AVE
.50
0 02/06/02
02/06/02
6,231
100
210 06 0130 / 4389
S COLUMBUS DR AND E CONGRESS DR
.50
0 03/06/02
03/06/02
4,728
100
210 06 0130 / 4389
S COLUMBUS DR AND E JACKSON BLVD
.50
0 01/17/02
01/17/02
4,856
100
210 06 0130 / 4389
S COLUMBUS DR AND E MONROE ST
1.0
0 01/16/02
01/16/02
13,229
100
210 06 0130 / 4389
S DEARBORN ST AND W ADAMS ST
1.0
0 04/05/02
04/05/02
8,901
100
210 06 0130 / 4389
S DEARBORN ST AND W JACKSON BLVD
.50
0 10/09/01
10/09/01
3,257
100
210 06 0130 / 4389
S DEARBORN ST AND W MONROE ST
1.0
0 09/26/01
09/26/01
6,918
100
210 06 0130 / 4389
S LA SALLE ST AND W ADAMS ST
1.0
0 10/02/01
10/02/01
7,324
100
210 06 0130 / 4389
S LA SALLE ST AND W MONROE ST
1.0
0 09/26/01
09/26/01
7,095
100
210 06 0130 / 4389
S MICHIGAN AVE AND E JACKSON BLVD
.50
0 11/04/02
11/04/02
5,132
100
210 06 0130 / 4389
S MICHIGAN AVE AND E MONROE ST
1.0
0 09/27/01
09/27/01
11,478
100
210 06 0130 / 4389
S STATE ST AND W MADISON ST
1.0
0 09/21/01
09/21/01
7,324
100
210 06 0130 / 4389
S WABASH AVE AND E ADAMS ST
1.0
0 10/03/01
10/03/01
6,513
100
210 06 0130 / 4389
S WABASH AVE AND E JACKSON BLVD
.50
0 10/09/01
10/09/01
2,395
100
210 06 0130 / 4389
S WELLS ST AND W ADAMS ST
.50
0 10/04/01
10/04/01
3,459
100
210 06 0130 / 4389
S WELLS ST AND W JACKSON BLVD
.50
0 10/10/01
10/10/01
2,940
100
210 06 0130 / 4389
S WELLS ST AND W MONROE ST
.50
0 10/04/01
10/04/01
3,662
100
210 06 0130 / 4389
320 N CLARK ST
1.0
0 11/21/01
11/21/01
3,927
100
Totals per LED Signal Head Install Totals per Traffic
112.0
322,000
960,363
3,487,726
5,843,683
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 449
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow
Locations
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
N FAIRBANKS CT AND E GRAND AVE
1.0
04/18/06
11/18/06
5,000
5,000
100
210 06 0021 / 4296
W GRAND AVE AND N KINGSBURY ST
1.0
01/31/02
05/03/02
10,543
100
Totals per Left Turn Arrow
Work Type: New Signal
2.0
60,000 11/17/01
11/17/01
65,000
15,543
Locations
210 06 0022 / 4297
N CLARK ST AND W SUPERIOR ST
1.0
210 06 0189 / 4434
1 N WACKER DR
1.0
44,000
0
2.0
59,000
14,868
Totals per New Signal
06/01/02
12/31/02
15,000 11/20/02
01/08/03
14,868
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 450
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install
Locations
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
210 06 0207 / 4450
N COLUMBUS DR AND E ILLINOIS ST
1.0
08/15/05
11/15/05
5,792
100
300 07 0042 / 5465
N DEARBORN ST AND W OAK ST
1.0
04/18/06
11/18/06
24,000
100
210 06 0207 / 4450
N FAIRBANKS CT AND E GRAND AVE
1.0
08/15/05
11/15/05
8,800 10/06/05
10/19/05
5,792
100
210 06 0240 / 4477
N LA SALLE ST AND W LAKE ST
8.0
05/01/06
06/01/06
12,500 08/24/06
08/24/06
6,155
100
210 06 0240 / 4477
N LA SALLE ST AND W RANDOLPH ST
8.0
05/01/06
06/01/06
12,500 08/23/06
08/23/06
5,007
100
210 06 0240 / 4477
N LA SALLE ST AND W WASHINGTON ST
8.0
05/01/06
06/01/06
11,000 08/23/06
08/23/06
5,224
100
210 06 0207 / 4450
N LOWER MICHIGAN AVE AND E GRAND AVE
1.0
08/15/05
11/15/05
6,600 10/06/05
11/15/05
5,792
100
210 06 0207 / 4450
N MICHIGAN AVE AND E GRAND AVE
1.0
08/15/05
11/15/05
8,800 08/26/05
12/02/05
5,792
100
210 06 0207 / 4450
N MICHIGAN AVE AND E OAK ST
1.0
08/15/05
08/01/05
8,959 08/26/05
08/26/05
2,982
100
210 06 0207 / 4450
N MICHIGAN AVE AND E RANDOLPH ST
1.0
12/01/04
12/15/04
12,650 12/01/04
12/08/04
6,617
100
210 06 0207 / 4450
N MICHIGAN AVE AND E WASHINGTON ST
1.0
12/01/04
12/15/04
7,672 12/01/04
12/08/04
6,079
100
210 06 0207 / 4450
N PESHTIGO CT AND E GRAND AVE
1.0
08/15/05
11/15/05
4,400 04/26/05
11/18/05
5,792
100
8,800 10/06/05
10/19/05
24,000
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 451
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install
Locations
210 06 0207 / 4450
N PESHTIGO CT AND E ILLINOIS ST
1.0
08/15/05
11/15/05
6,600 10/06/05
10/19/05
5,792
100
210 06 0207 / 4450
N ST CLAIR ST AND E GRAND AVE
1.0
08/15/05
11/15/05
8,800 10/06/05
10/19/05
5,792
100
210 06 0207 / 4450
N STREETER DR AND E ILLINOIS ST
1.0
08/15/05
11/15/05
6,600 10/06/05
10/19/05
5,792
100
210 06 0243 / 4480
N WABASH AVE AND E WASHINGTON ST
.0
03/15/06
05/08/07
12,000 01/15/07
02/15/07
5,213
100
210 06 0207 / 4450
S MICHIGAN AVE AND E ADAMS ST
1.0
12/01/04
12/15/04
5,180 12/01/04
12/08/04
4,361
100
210 06 0207 / 4450
S MICHIGAN AVE AND E JACKSON BLVD
.50
12/01/04
12/15/04
5,179 12/01/04
12/08/04
5,255
100
210 06 0207 / 4450
S MICHIGAN AVE AND E MONROE ST
1.0
12/01/04
12/15/04
10,358 12/01/04
12/08/04
18,193
100
210 06 0243 / 4480
W ILLINOIS ST AND N LA SALLE DR
.0
04/01/06
04/01/07
11,356 07/18/07
07/18/07
4,190
100
Totals per Pedestrian Countdown Signal Install
Work Type: Pedestrian Countdown Signal Installation
38.50
192,754
139,612
Installations
210 06 / 32276
E DELAWARE PL AND N MICHIGAN AVE
.0
04/01/07
02/28/08
11,744
0
0
210 06 / 32276
N CANAL ST AND W MADISON ST
.0
04/01/07
02/28/08
11,356
0
0
210 06 / 32276
N CLINTON ST AND W MADISON ST
.0
04/01/07
02/28/08
11,356
0
0
210 06 / 32276
N FAIRBANKS CT AND E ONTARIO ST
.0
04/01/07
02/28/08
11,356
0
0
45,812
0
Totals per Pedestrian Countdown Signal Installation
Work Type: Signal Removal 300 06 0225 / 5340
N DESPLAINES ST AND W RANDOLPH ST
Work Type: Signals 300 06 0096 / 5258
121 N LA SALLE ST
.0
Locations .50
11/01/02
11/30/02
2,500 09/25/02
11/14/02
1,906
100
03/01/05
03/01/05
0 08/31/06
10/30/06
0
0
Intersections 161.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 452
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
300 09 / 33108
ON N WABASH AVE FROM E SUPERIOR ST TO E ONTARIO ST
1.0
6,600 04/01/08
12/01/08
0
0
210 06 0022 / 4297
N CLARK ST AND W ERIE ST
1.0
07/01/02
08/30/02
15,000 06/10/02
08/25/02
14,645
100
210 06 0023 / 4298
N CLARK ST AND W ERIE ST
1.0
01/15/03
03/15/03
139,000 11/20/02
12/24/02
133,112
100
210 06 0021 / 4296
N CLARK ST AND W MAPLE ST
1.0
02/01/01
05/31/01
133,500 11/15/00
03/06/01
153,138
100
210 06 0023 / 4298
N CLARK ST AND W SUPERIOR ST
1.0
02/01/03
04/01/03
133,000 11/20/02
01/08/03
103,819
100
210 06 0184 / 4430
N FAIRBANKS CT AND E HURON ST
1.0
09/15/04
03/01/05
180,000 09/15/04
02/25/05
170,452
100
210 06 0021 / 4296
N ORLEANS ST AND W SUPERIOR ST
1.0
11/06/00
12/31/01
133,000 11/03/00
10/30/01
166,266
100
210 06 0023 / 4298
N RUSH ST AND E WALTON ST
1.0
03/15/03
05/15/03
108,000 01/06/03
02/21/03
131,439
100
210 06 0022 / 4297
N STATE ST AND E BELLEVUE PL
1.0
03/15/02
05/17/02
143,500 01/17/02
05/07/02
175,165
100
210 06 0023 / 4298
N WELLS ST AND W HURON ST
1.0
07/01/03
09/01/03
139,000 03/31/03
05/12/03
134,983
100
300 11 / 32231
W CHESTNUT ST AND N DEARBORN ST
1.0
11/29/06
06/21/07
18,652 11/29/06
06/21/07
178,652
100
210 06 0135 / 4393
W LAKE ST AND N CLINTON ST
1.0
09/14/01
12/31/01
138,405 09/14/01
11/21/01
12,387
100
300 03 0042 / 4913
W ONTARIO ST AND N KINGSBURY ST
1.0
814 06 0301 / 16513
382 E BALBO DR
1.0
271 00 0045 / 4794
400 E OHIO ST
1.0
814 06 0332 / 16535
430 N CLARK ST
1.0
04/24/97
814 06 0343 / 16541
1600 N CLARK ST
1.0
01/01/96
814 06 0241 / 16453
500 N COLUMBUS DR
1.0
814 06 0330 / 16533
430 N DEARBORN ST
210 06 0060 / 4327
200,000 04/19/90
04/19/90
0
0 04/19/90
04/19/90
277,443
0 08/01/97
08/15/99
201,000
100
04/24/97
0 04/24/97
07/31/97
200,000
100
01/01/96
0 01/01/96
01/06/98
146,217
100
01/01/93
01/01/93
0 01/01/93
01/01/93
8,000
100
1.0
04/08/97
04/08/97
0 04/08/97
05/06/97
200,000
100
658 N DEARBORN ST
1.0
06/01/99
12/01/99
150,000 03/03/99
09/23/99
100,448
100
210 06 0061 / 4328
700 N DEARBORN ST
1.0
06/01/99
12/01/99
150,000 07/06/99
09/23/99
124,041
100
210 06 0062 / 4329
732 N DEARBORN ST
1.0
06/01/99
12/01/99
150,000 06/07/99
09/23/99
106,124
100
814 06 0246 / 16458
100 N JEFFERSON ST
1.0
02/06/92
02/06/92
0 02/06/92
02/06/92
88,990
100
814 06 0228 / 16440
148 N JEFFERSON ST
1.0
02/07/92
02/07/92
0 02/07/92
02/07/92
88,990
100
814 06 0209 / 16421
200 N JEFFERSON ST
1.0
02/04/92
02/04/92
0 02/04/92
02/04/92
88,990
100
814 06 0182 / 16394
300 N JEFFERSON ST
1.0
03/23/92
03/23/92
0 03/23/92
03/23/92
106,743
100
814 06 0272 / 16484
800 N MIES VAN DER ROHE WY
1.0
01/24/89
01/24/89
0 01/24/89
01/24/89
95,000
100
814 06 0305 / 16517
500 N ORLEANS ST
1.0
01/08/92
01/08/92
0 01/08/92
01/08/92
110,000
100
814 06 0306 / 16518
530 N ORLEANS ST
1.0
01/02/92
01/02/92
0 01/02/92
01/02/92
110,000
100
210 06 0072 / 4336
700 N ORLEANS ST
1.0
02/10/00
04/15/00
150,000 02/17/00
06/27/00
165,236
100
210 06 0019 / 4294
932 N STATE ST
1.0
125,000 10/16/98
10/29/98
90,174
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 453
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0019 / 4294
1000 N STATE ST
1.0
125,000 11/18/98
03/22/99
115,227
100
814 06 0267 / 16479
430 N WELLS ST
1.0
03/11/92
03/11/92
0 03/11/92
03/11/92
108,062
100
814 06 0263 / 16475
500 N WELLS ST
1.0
03/10/92
03/10/92
0 03/10/92
03/10/92
108,062
100
814 06 0131 / 16345
500 S LAKE SHORE DR
1.0
05/22/90
05/22/90
0 05/22/90
05/22/90
115,491
100
300 06 0078 / 5241
36 W ILLINOIS ST
1.0
06/15/00
07/01/00
5,000 07/14/00
07/18/00
11,701
100
210 06 0167 / 4418
540 W MADISON ST
2.0
09/01/03
12/31/03
417,924 09/06/01
10/27/03
306,019
100
814 06 0235 / 16447
600 W MADISON ST
1.0
02/05/92
02/05/92
0 02/05/92
02/05/92
88,990
100
814 06 0242 / 16454
421 W WASHINGTON ST
1.0
01/01/94
01/01/94
0 01/01/94
01/01/94
120,000
100
Totals per TSM Install
40.0
2,760,581
4,655,006
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 454
1/1/2008 AND 12/31/2008
Ward 42 Brendan Reilly CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Traffic Equipment Painting
Locations
300 07 0042 / 5465
ON N DEARBORN ST FROM W ONTARIO ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W ERIE ST TO W HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W HURON ST TO W SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N FRANKLIN ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W RANDOLPH ST TO W LAKE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N JEFFERSON ST FROM W WASHINGTON BLVD TO W RANDOLPH ST
.0
03/01/06
12/31/06
0
0
0
300 07 0043 / 5466
ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE
9.0
04/18/06
11/18/06
3,675 08/04/06
09/01/06
0
100
300 06 0251 / 5361
ON N MICHIGAN AVE FROM E MADISON ST TO E LAKE ST
214.0
07/15/05
08/30/05
20,404 07/10/05
08/01/05
49,605
100
300 07 0042 / 5465
ON N ORLEANS ST FROM W GRAND AVE TO W OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W HURON ST TO W ERIE ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W ILLINOIS ST TO W GRAND AVE
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N ORLEANS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM CHESTNUT ST TO PEARSON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N STATE ST FROM ERIE ST TO HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E ERIE ST TO E HURON ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E GRAND AVE TO E OHIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WABASH AVE FROM E HURON ST TO E SUPERIOR ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON N WELLS ST FROM W OHIO ST TO W ONTARIO ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ERIE ST FROM N STATE ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
ON W ONTARIO ST FROM N CLARK ST TO N DEARBORN ST
.0
03/01/06
12/31/06
0
0
0
300 07 0042 / 5465
121 N LA SALLE ST
21.0
04/18/06
11/18/06
4,146
100
Totals per Traffic Equipment Painting
Work Type: Traffic Equipment Reloc 300 06 0225 / 5340
N JEFFERSON ST AND W LAKE ST
Work Type: Traffic Monitoring Cameras 300 06 0225 / 5340
E MONROE ST AND S MICHIGAN AVE
244.0
7,500 08/14/06
09/01/06
31,579
53,751
Locations 1.0
11/14/03
11/14/03
3,500 11/05/03
11/05/03
1,234
100
11/01/02
11/30/02
5,000 10/28/02
10/28/02
1,400
100
Locations 1.0
Totals per Construction Phase
7,012,377
10,037,432
Totals for Ward 42
7,089,854
10,049,383
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 455
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
1,391
100
300 06 / 32146
ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE
1.0
05/01/07
10/31/07
3,900 07/03/07
07/31/07
2,000
100
300 11 / 32232
N CLARK ST AND N LINCOLN AVE
1.0
06/01/07
12/31/07
0
2,317
100
300 11 / 32232
N CLARK ST AND W FULLERTON PKWY
1.0
06/01/07
12/31/07
0
290
100
300 11 / 32232
N CLARK ST AND W WEBSTER AVE
1.0
06/01/07
12/31/07
0
2,897
100
300 11 / 32232
N HALSTED ST AND W WEBSTER AVE
1.0
06/01/07
12/31/07
0
232
100
300 11 / 32232
N LINCOLN AVE AND W WEBSTER AVE
.0
06/01/07
12/31/07
0
0
0
300 11 / 32232
W ARMITAGE AVE AND N CLARK ST
1.0
06/01/07
12/31/07
0
5,301
100
300 11 / 32232
W ARMITAGE AVE AND N HALSTED ST
1.0
06/01/07
12/31/07
0
290
100
300 11 / 32232
W BELDEN AVE AND N CLARK ST
.0
06/01/07
12/31/07
0
3,186
0
210 06 0240 / 4477
W DIVERSEY PKWY AND N SHERIDAN RD
.0
10/10/05
07/31/06
210 06 0240 / 4477
W NORTH AVE AND N SEDGWICK ST
.0
10/10/05
210 06 0207 / 4450
2350 N LINCOLN AVE
.0
07/01/04
Totals per Design/Engineering
Work Type: Feasibility Study
600 10/10/05
04/27/06
250
100
07/31/06
600 10/10/05
08/08/06
125
100
12/30/04
1,500 08/02/06
08/08/06
470
100
7.0
6,600
18,749
Projects
302 00 0079 / 5767
ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
302 00 0079 / 5767
ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
Totals per Feasibility Study Totals per Lighting/Electrical
.0
0
0
6,600
18,749
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 456
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 07 0032 / 5455
ON N CLYBOURN AVE FROM W WEBSTER AVE TO N MAGNOLIA AVE
1.0
04/18/06
11/18/06
400 09/22/06
10/10/06
202
100
300 06 0122 / 5275
ON N FREMONT ST FROM W NORTH AVE TO W BLACKHAWK ST
6.0
11/01/03
11/07/03
2,250 10/30/03
10/30/03
1,461
100
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
2.50
04/18/06
11/18/06
1,000 09/22/06
10/10/06
505
100
300 07 0032 / 5455
ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
2.50
04/18/06
11/18/06
1,000 09/22/06
10/10/06
0
100
300 06 0069 / 5233
900 W MONTANA ST
5.0
02/16/03
02/16/03
1,015 02/13/03
02/13/03
2,089
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
17.0
5,665
4,257
Fixtures
300 09 / 33109
ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE
12.0
07/07/08
07/11/08
5,800 07/07/08
07/11/08
4,142
100
300 09 / 33109
ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
9.0
02/01/08
12/31/08
3,600 08/07/08
08/11/08
3,048
100
300 09 / 33109
ON N RACINE AVE FROM W DICKENS AVE TO N MAUD AVE
9.0
06/23/08
06/27/08
3,600 04/01/08
12/01/08
0
0
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
1,600 09/07/06
10/10/06
808
100
300 06 0069 / 5233
ON W ARMITAGE AVE FROM N SHEFFIELD AVE TO N HALSTED ST
52.0
08/23/02
08/23/02
20,800 08/20/02
08/20/02
19,500
100
300 03 0043 / 4914
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
9.50
07/10/04
07/13/04
3,800 07/05/04
07/12/04
2,430
100
300 03 0044 / 4915
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
41.0
07/10/04
07/13/04
16,400 07/12/04
08/10/04
10,486
100
300 06 0069 / 5233
ON W FULLERTON AVE FROM N LINCOLN AVE TO N CLARK ST
24.0
12/15/03
12/21/03
9,000 01/13/04
01/18/04
3,702
100
300 07 0043 / 5466
ON W WEBSTER AVE FROM N CLEVELAND AVE TO N LINCOLN AVE
1.0
04/18/06
11/18/06
2,400 11/01/06
11/01/06
2,886
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
161.50
67,000
47,001
1,632,999
1,563,366
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 457
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 2021 / 8207
2421 N CLARK ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1655 / 7841
2440 N CLARK ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1637 / 7823
2464 N CLARK ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1648 / 7834
2581 N CLARK ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1629 / 7815
2634 N CLARK ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1610 / 7796
2749 N CLARK ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1465 / 7651
1518 N CLEVELAND AVE
1.0
05/23/96
05/23/96
0 05/23/96
05/23/96
300
100
805 06 1511 / 7697
2325 N COMMONWEALTH AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1492 / 7678
2330 N COMMONWEALTH AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1473 / 7659
2331 N COMMONWEALTH AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1484 / 7670
2350 N COMMONWEALTH AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1773 / 7959
1704 N CRILLY CT
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1784 / 7970
1720 N CRILLY CT
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0850 / 7036
1651 N DAYTON ST
1.0
11/06/96
11/06/96
0 11/06/96
11/06/96
300
100
805 06 1142 / 7328
1651 N DAYTON ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1153 / 7339
2617 N DAYTON ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1134 / 7320
2730 N DAYTON ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1140 / 7326
1814 N HALSTED ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1129 / 7315
1914 N HALSTED ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1150 / 7336
1959 N HALSTED ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1131 / 7317
1973 N HALSTED ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1132 / 7318
2009 N HALSTED ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1133 / 7319
2021 N HALSTED ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1135 / 7321
2045 N HALSTED ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1136 / 7322
2049 N HALSTED ST
1.0
12/09/96
12/09/96
0 12/09/96
12/09/96
300
100
805 06 1137 / 7323
2145 N HALSTED ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1138 / 7324
2213 N HALSTED ST
1.0
04/27/96
04/27/96
0 04/27/96
04/27/96
300
100
805 06 1105 / 7291
2237 N HALSTED ST
1.0
04/22/96
04/22/96
0 04/22/96
04/22/96
300
100
805 06 1151 / 7337
2417 N HALSTED ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1121 / 7307
2705 N HALSTED ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1066 / 7252
2730 N HALSTED ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 458
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1067 / 7253
2733 N HALSTED ST
1.0
12/24/96
12/24/96
0 12/24/96
12/24/96
300
100
805 06 1054 / 7240
2630 N HAMPDEN CT
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1461 / 7647
1518 N HUDSON AVE
1.0
12/03/97
12/03/97
0 12/03/97
12/03/97
300
100
805 06 1215 / 7401
1812 N HUDSON AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 1186 / 7372
1834 N HUDSON AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 1188 / 7374
2144 N HUDSON AVE
1.0
12/03/96
12/03/96
0 12/03/96
12/03/96
300
100
805 06 0304 / 6490
2265 N LINCOLN AVE
1.0
05/23/96
05/23/96
0 05/23/96
05/23/96
300
100
805 06 0350 / 6536
2358 N LINCOLN AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 2091 / 8277
1811 N LINCOLN PARK WEST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1933 / 8119
2622 N MILDRED AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1964 / 8150
2651 N MILDRED AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 1923 / 8109
1617 N MOHAWK ST
1.0
06/05/96
06/05/96
0 06/05/96
06/05/96
300
100
805 06 1952 / 8138
1631 N MOHAWK ST
1.0
01/26/96
01/26/96
0 01/26/96
01/26/96
300
100
805 06 1980 / 8166
2011 N MOHAWK ST
1.0
01/26/96
01/26/96
0 01/26/96
01/26/96
300
100
805 06 1941 / 8127
2043 N MOHAWK ST
1.0
01/26/96
01/26/96
0 01/26/96
01/26/96
300
100
805 06 0604 / 6790
2219 N ORCHARD ST
1.0
11/21/96
11/21/96
0 11/21/96
11/21/96
300
100
805 06 0595 / 6781
2223 N ORCHARD ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0629 / 6815
2229 N ORCHARD ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0630 / 6816
1811 N ORLEANS ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0601 / 6787
1823 N ORLEANS ST
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0602 / 6788
1823 N ORLEANS ST
1.0
12/03/96
12/03/96
0 12/03/96
12/03/96
300
100
805 06 0603 / 6789
1824 N ORLEANS ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0586 / 6772
1840 N ORLEANS ST
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0529 / 6715
2700 N PINE GROVE AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1462 / 7648
1520 N SEDGWICK ST
1.0
12/03/97
12/03/97
0 12/03/97
12/03/97
300
100
805 06 0621 / 6807
1618 N SEDGWICK ST
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0673 / 6859
2113 N SHEFFIELD AVE
1.0
05/16/96
05/16/96
0 05/16/96
05/16/96
300
100
805 06 0641 / 6827
2131 N SHEFFIELD AVE
1.0
05/17/96
05/17/96
0 05/17/96
05/17/96
300
100
805 06 0718 / 6904
830 W ALTGELD ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0706 / 6892
907 W ALTGELD ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0732 / 6918
1018 W ALTGELD ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 459
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0733 / 6919
1113 W ALTGELD ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0737 / 6923
950 W ARMITAGE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0852 / 7038
549 W BELDEN AVE
1.0
12/05/96
12/05/96
0 12/05/96
12/05/96
300
100
805 06 0854 / 7040
619 W BELDEN AVE
1.0
12/04/96
12/04/96
0 12/04/96
12/04/96
300
100
805 06 1564 / 7750
315 W CONCORD PL
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0997 / 7183
613 W DIVERSEY PKWY
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0670 / 6856
237 W EUGENIE ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0761 / 6947
335 W EUGENIE ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 0632 / 6818
403 W EUGENIE ST
1.0
11/29/96
11/29/96
0 11/29/96
11/29/96
300
100
805 06 1116 / 7302
722 W FULLERTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1117 / 7303
903 W FULLERTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1118 / 7304
949 W FULLERTON AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1801 / 7987
428 W FULLERTON PKWY
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1113 / 7299
626 W FULLERTON PKWY
1.0
12/05/96
12/05/96
0 12/05/96
12/05/96
300
100
805 06 0336 / 6522
1103 W LILL AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 0337 / 6523
1113 W LILL AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 1972 / 8158
1018 W MONTANA ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1962 / 8148
1032 W MONTANA ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1951 / 8137
1140 W MONTANA ST
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
805 06 1464 / 7650
435 W NORTH AVE
1.0
12/03/97
12/03/97
0 12/03/97
12/03/97
300
100
805 06 1466 / 7652
525 W NORTH AVE
1.0
12/03/97
12/03/97
0 12/03/97
12/03/97
300
100
805 06 0620 / 6806
637 W SCHUBERT AVE
1.0
12/05/96
12/05/96
0 12/05/96
12/05/96
300
100
805 06 0513 / 6699
636 W WEBSTER AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0511 / 6697
652 W WEBSTER AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0503 / 6689
658 W WEBSTER AVE
1.0
11/20/96
11/20/96
0 11/20/96
11/20/96
300
100
805 06 0463 / 6649
323 W WISCONSIN ST
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0470 / 6656
444 W WRIGHTWOOD AVE
1.0
12/04/96
12/04/96
0 12/04/96
12/04/96
300
100
300 06 0139 / 5289
735 W WRIGHTWOOD AVE
596.0
03/01/06
09/01/06
13,796 05/10/06
06/01/06
18,007
100
302 00 0092 / 5774
735 W WRIGHTWOOD AVE
25.0
0 01/04/01
01/17/02
5,891
100
805 06 0472 / 6658
931 W WRIGHTWOOD AVE
1.0
12/26/96
12/26/96
0 12/26/96
12/26/96
300
100
805 06 0473 / 6659
939 W WRIGHTWOOD AVE
1.0
12/23/96
12/23/96
0 12/23/96
12/23/96
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 460
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0215 / 5336
735 W WRIGHTWOOD AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
735 W WRIGHTWOOD AVE
Work Type: Flood Light Install
Installations 712.0
13,796
51,198
Lamps 1,796.0
06/01/07
12/31/07
52,874 07/10/07
08/16/07
52,874
100
0 05/17/02
05/20/02
29,151
100
Installations 1,601.0
Fixtures
300 06 0167 / 5306
N ORCHARD ST AND W DEMING PL
2.0
0 11/30/99
11/30/99
702
100
302 00 0092 / 5774
602 W DICKENS AVE
1.0
0 08/22/01
08/22/01
404
100
3.0
0
Totals per Flood Light Install
Work Type: Lighting Imprvmnts
1,106
Projects
300 06 0203 / 5326
ON W WISCONSIN ST FROM N SEDGWICK ST TO N CLEVELAND AVE
08/01/01
12/01/01
46,535 07/25/01
07/30/01
44,487
100
300 06 0203 / 5326
1900 N LINCOLN AVE
08/01/01
12/01/01
29,702 08/17/01
10/15/01
12,671
100
300 06 0203 / 5326
2000 N LINCOLN AVE
08/01/01
12/01/01
74,098 08/06/01
08/16/01
53,725
100
300 06 0203 / 5326
1900 N SEDGWICK ST
08/01/01
12/01/01
29,510 07/31/01
08/03/01
6,183
100
300 06 0118 / 5272
2400 N SHEFFIELD AVE
10/30/00
06/29/01
92,687 03/06/01
05/16/01
96,827
100
Totals per Lighting Imprvmnts
Work Type: Ornamental - Piggyback Lighting
1.0 1.0
272,532
213,893
Fixtures
300 09 / 33109
ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE
22.0
07/28/08
08/01/08
29,700 07/28/08
08/01/08
24,493
100
300 09 / 33109
ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
9.0
08/25/08
09/12/08
12,150 08/25/08
09/12/08
10,324
100
300 07 0032 / 5455
ON N SHEFFIELD AVE FROM W DICKENS AVE TO W WEBSTER AVE
4.0
04/18/06
11/18/06
5,400 09/22/06
10/10/06
3,425
100
300 06 0069 / 5233
ON W ARMITAGE AVE FROM N HALSTED ST TO N ORCHARD ST
9.0
12/10/02
12/11/02
10,800 12/10/02
12/11/02
12,245
100
300 06 0122 / 5275
ON W NORTH AVE FROM N WELLS ST TO N CLARK ST
8.45
08/20/03
08/25/03
10,530 08/19/03
08/25/03
9,781
100
300 06 0122 / 5275
ON W NORTH BLVD FROM N CLARK ST TO N DEARBORN PKWY
6.50
08/20/03
08/25/03
8,100 08/19/03
08/22/03
15,048
100
300 06 0069 / 5233
N CLARK ST AND W FULLERTON AVE
35.0
12/01/02
12/20/02
42,000 12/01/02
12/20/02
45,531
100
300 06 0122 / 5275
160 W WENDELL ST
1.0
06/01/04
07/01/04
1,450 05/25/04
05/25/04
1,200
100
Totals per Ornamental - Piggyback Lighting
94.95
120,130
122,047
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 461
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residential Regrouping
Lamps
735 W WRIGHTWOOD AVE
.0
300 06 0270 / 5378
Work Type: Residntl Staggered Lighting
03/01/08
12/01/08
0
ON N DAYTON ST FROM W BLACKHAWK ST TO W NORTH AVE
2.0
04/01/06
06/01/06
102,397 03/27/06
300 06 / 32146
ON N MOHAWK ST FROM N CLYBOURN AVE TO W NORTH AVE
4.0
12/05/07
06/24/08
245,174 12/12/07
300 06 0298 / 5405
ON W BLACKHAWK ST FROM N HALSTED ST TO N FREMONT ST
2.0
06/01/05
07/15/05
0 06/10/05
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON N BURLING ST FROM W FULLERTON AVE TO W SCHUBERT AVE
302 00 0092 / 5774
ON W GOETHE ST FROM N WELLS ST TO N SEDGWICK ST
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
1401 N WIELAND ST
0
76,570
100
Blocks
300 06 0308 / 5414
Totals per Residntl Staggered Lighting
0
8.0
05/12/06
07/29/05
347,571
0
50
85,262
100
161,832
Blocks 2.0
03/10/03 08/13/01
2.0
05/06/03
221,216 03/10/03
05/06/03
218,036
100
41,000 08/13/01
09/07/01
40,581
100
262,216
258,617
Locations 1.0
0 01/23/01
01/23/01
378
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 462
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 07 0043 / 5466
ON E BANKS ST FROM N STATE PKWY TO N LAKE SHORE DR WEST
8.0
04/18/06
11/18/06
1,600 08/04/06
09/01/06
1,554
100
300 07 0043 / 5466
ON E BURTON PL FROM N STATE PKWY TO N LAKE SHORE DR WEST
5.0
04/18/06
11/18/06
1,000 08/04/06
09/01/06
971
100
300 07 0043 / 5466
ON E GOETHE ST FROM N STATE PKWY TO N LAKE SHORE DR WEST
6.0
04/18/06
11/18/06
1,200 08/04/06
09/01/06
1,165
100
300 07 0043 / 5466
ON E SCHILLER ST FROM N STATE PKWY TO N LAKE SHORE DR WEST
8.0
04/18/06
11/18/06
1,600 08/04/06
09/01/06
1,554
100
300 07 0043 / 5466
ON E SCOTT ST FROM N STATE PKWY TO N LAKE SHORE DR WEST
6.0
04/18/06
11/18/06
1,200 08/04/06
09/01/06
1,165
100
300 07 0043 / 5466
ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE
27.0
04/18/06
11/18/06
5,400 08/04/06
09/01/06
5,244
100
300 05 0043 / 5158
ON N BISSELL ST FROM N DAYTON ST TO W BELDEN AVE
34.0
04/04/05
11/18/05
6,800 06/27/05
07/23/05
5,451
100
300 09 / 33109
ON N BISSELL ST FROM W ARMITAGE AVE TO W BELDEN AVE
14.0
05/19/08
06/20/08
2,800 04/01/08
12/01/08
1,680
100
300 07 0043 / 5466
ON N BURLING ST FROM W FULLERTON AVE TO W ARMITAGE AVE
8.0
04/18/06
11/18/06
1,600 08/04/06
09/01/06
1,554
100
300 06 0108 / 5263
ON N CLARK ST FROM W NORTH AVE TO W ARMITAGE AVE
61.0
06/20/03
07/01/03
22,200 07/07/03
07/17/03
22,190
100
300 09 / 33109
ON N CLEVELAND AVE FROM N CLYBOURN AVE TO W NORTH AVE
9.80
05/19/08
06/20/08
1,960 04/01/08
12/01/08
1,176
100
300 07 0043 / 5466
ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W FULLERTON PKWY
17.0
04/18/06
11/18/06
3,400 08/04/06
09/01/06
3,301
100
300 05 0043 / 5158
ON N CLEVELAND AVE FROM W ARMITAGE AVE TO W NORTH AVE
16.0
04/04/05
11/18/05
3,200 06/27/05
07/23/05
2,565
100
300 09 / 33109
ON N CLIFTON AVE FROM W ARMITAGE AVE TO W DICKENS AVE
1.0
05/19/08
06/20/08
200 04/01/08
12/01/08
120
100
300 07 0043 / 5466
4.0
04/18/06
11/18/06
800 08/04/06
09/01/06
777
100
300 06 0108 / 5263
ON N COMMONWEALTH AVE FROM W BELDEN AVE TO W FULLERTON PKWY ON N CRILLY CT FROM W EUGENIE ST TO W ST PAUL AVE
3.0
06/20/03
07/01/03
560 07/07/03
07/17/03
587
100
300 06 0108 / 5263
ON N CRILLY CT FROM W WILLOW ST TO W MENOMONEE ST
3.0
06/20/03
07/01/03
560 07/07/03
07/17/03
587
100
300 05 0043 / 5158
ON N DAYTON ST FROM N BISSELL ST TO W BELDEN AVE
32.0
04/04/05
11/18/05
6,400 06/27/05
07/23/05
5,130
100
300 09 / 33109
ON N DAYTON ST FROM W ARMITAGE AVE TO W BELDEN AVE
12.0
05/19/08
06/20/08
2,400 04/01/08
12/01/08
14,400
100
300 09 / 33109
ON N DAYTON ST FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY
8.0
05/19/08
06/20/08
1,600 04/01/08
12/01/08
960
100
300 05 0043 / 5158
ON N FERN CT FROM W EUGENIE ST TO W WILLOW ST
4.0
04/04/05
11/18/05
800 06/27/05
07/23/05
641
100
300 05 0043 / 5158
ON N FREMONT ST FROM N BISSELL ST TO W BELDEN AVE
33.0
04/04/05
11/18/05
6,600 06/27/05
07/23/05
5,291
100
300 09 / 33109
ON N FREMONT ST FROM W ARMITAGE AVE TO W BELDEN AVE
18.0
05/19/08
06/20/08
3,600 04/01/08
12/01/08
2,160
100
300 09 / 33109
ON N GENEVA TER FROM W FULLERTON PKWY TO W DEMING PL
6.0
05/19/08
06/20/08
1,200 04/01/08
12/01/08
720
100
300 07 0043 / 5466
ON N GENEVA TER FROM W WEBSTER AVE TO W FULLERTON PKWY
9.0
04/18/06
11/18/06
2,250 08/04/06
09/01/06
1,748
100
302 00 0076 / 5764
ON N HALSTED ST FROM W NORTH AVE TO W FULLERTON AVE
07/08/98
07/08/98
0 07/08/98
07/08/98
0
300 09 / 33109
ON N HAMPDEN CT FROM W DEMING PL TO W DIVERSEY PKWY
11.0
05/19/08
06/20/08
2,200 04/01/08
12/01/08
1,320
100
300 07 0043 / 5466
ON N HOWE ST FROM W ARMITAGE AVE TO W DICKENS AVE
5.0
04/18/06
11/18/06
1,000 08/04/06
09/01/06
971
100
300 05 0043 / 5158
ON N HOWE ST FROM W WILLOW ST TO W ARMITAGE AVE
12.0
04/04/05
11/18/05
2,400 06/27/05
07/23/05
1,924
100
300 09 / 33109
ON N HUDSON AVE FROM W BLACKHAWK ST TO W NORTH AVE
4.0
05/19/08
06/20/08
800 04/01/08
12/01/08
480
100
300 07 0043 / 5466
ON N HUDSON AVE FROM W DICKENS AVE TO W WEBSTER AVE
5.0
04/18/06
11/18/06
1,000 08/04/06
09/01/06
971
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 463
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 05 0043 / 5158
ON N HUDSON AVE FROM W MENOMONEE ST TO W ARMITAGE AVE
8.0
04/04/05
11/18/05
1,600 06/27/05
07/23/05
1,283
100
300 05 0043 / 5158
ON N HUDSON AVE FROM W NORTH AVE TO W WILLOW ST
8.0
04/04/05
11/18/05
1,600 06/27/05
07/23/05
1,283
100
300 09 / 33109
ON N KENMORE AVE FROM W ARMITAGE AVE TO W DICKENS AVE
2.0
05/19/08
06/20/08
400 04/01/08
12/01/08
240
100
300 07 0043 / 5466
ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE
14.50
04/18/06
11/18/06
3,625 08/04/06
09/01/06
0
100
300 05 0043 / 5158
ON N LARRABEE ST FROM W NORTH AVE TO W ARMITAGE AVE
37.0
04/04/05
11/18/05
7,400 06/27/05
07/23/05
8,003
100
300 09 / 33109
ON N LINCOLN AVE FROM N WELLS ST TO W WEBSTER AVE
22.0
06/30/08
07/07/08
5,500 06/30/08
07/07/08
4,400
100
300 05 0043 / 5158
3.0
04/04/05
11/18/05
600 06/27/05
07/23/05
481
100
300 09 / 33109
ON N LINCOLN PARK WEST FROM W MENOMONEE ST TO W WISCONSIN ST ON N MAGNOLIA AVE FROM W DICKENS AVE TO N CLYBOURN AVE
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 05 0043 / 5158
ON N MEYER AVE FROM N CLEVELAND AVE TO W EUGENIE ST
4.0
04/04/05
11/18/05
800 06/27/05
07/23/05
641
100
300 09 / 33109
ON N MILDRED AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY
6.0
05/19/08
06/20/08
1,200 04/01/08
12/01/08
720
100
300 05 0043 / 5158
ON N MOHAWK ST FROM W ARMITAGE AVE TO W NORTH AVE
16.0
04/04/05
11/18/05
3,200 06/27/05
07/23/05
2,565
100
300 09 / 33109
ON N ORCHARD ST FROM W FULLERTON AVE TO W WRIGHTWOOD AVE
7.0
05/19/08
06/20/08
1,400 04/01/08
12/01/08
840
100
300 05 0043 / 5158
ON N ORCHARD ST FROM W NORTH AVE TO W ARMITAGE AVE
20.0
04/04/05
11/18/05
4,000 06/27/05
07/23/05
3,206
100
300 07 0043 / 5466
ON N ORCHARD ST FROM W WEBSTER AVE TO W FULLERTON AVE
9.0
04/18/06
11/18/06
2,250 08/04/06
09/01/06
1,748
100
300 07 0043 / 5466
ON N ORLEANS ST FROM W ARMITAGE AVE TO W DICKENS AVE
5.0
04/18/06
11/18/06
1,000 08/04/06
09/01/06
971
100
300 06 0108 / 5263
ON N ORLEANS ST FROM W EUGENIE ST TO W WILLOW ST
3.0
08/20/03
09/01/03
560 08/19/03
08/22/03
587
100
300 06 0108 / 5263
ON N ORLEANS ST FROM W MENOMONEE ST TO W WISCONSIN ST
3.0
08/01/03
09/08/03
560 08/01/03
08/22/03
587
100
300 09 / 33109
4.0
05/19/08
06/20/08
800 04/01/08
12/01/08
480
100
300 09 / 33109
ON N PINE GROVE AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY ON N RACINE AVE FROM N MAUD AVE TO W DICKENS AVE
9.0
06/16/08
06/20/08
2,700 06/16/08
06/20/08
1,800
100
300 07 0043 / 5466
ON N RITCHIE CT FROM E GOETHE ST TO E BANKS ST
4.0
04/18/06
11/18/06
800 08/04/06
09/01/06
777
100
300 06 0108 / 5263
ON N SEDGWICK ST FROM W NORTH AVE TO W ARMITAGE AVE
16.0
08/01/03
09/08/03
2,970 08/01/03
08/22/03
3,134
100
300 07 0043 / 5466
ON N SEDGWICK ST FROM W WEBSTER AVE TO N LINCOLN AVE
14.0
04/18/06
11/18/06
2,800 08/04/06
09/01/06
2,719
100
300 09 / 33109
ON N SEMINARY AVE FROM W ARMITAGE AVE TO W DICKENS AVE
2.0
05/19/08
06/20/08
400 04/01/08
12/01/08
240
100
300 09 / 33109
ON N SEMINARY AVE FROM W FULLERTON AVE TO W LILL AVE
4.0
05/19/08
06/20/08
800 04/01/08
12/01/08
480
100
300 09 / 33109
ON N SHEFFIELD AVE FROM W ARMITAGE AVE TO W WEBSTER AVE
6.75
05/19/08
06/20/08
1,350 04/01/08
12/01/08
1,350
100
300 05 0043 / 5158
ON N ST MICHAELS CT FROM W EUGENIE ST TO W WILLOW ST
5.0
04/04/05
11/18/05
1,000 06/27/05
07/23/05
802
100
300 07 0043 / 5466
ON N STONE ST FROM E DIVISION ST TO E GOETHE ST
8.0
04/18/06
11/18/06
1,600 08/04/06
09/01/06
1,554
100
300 05 0043 / 5158
ON N VINE ST FROM W NORTH AVE TO W WILLOW ST
7.0
04/04/05
11/18/05
1,400 06/27/05
07/23/05
1,122
100
300 09 / 33109
ON N WILTON AVE FROM W WRIGHTWOOD AVE TO W DIVERSEY PKWY
6.0
05/19/08
06/20/08
1,200 04/01/08
12/01/08
720
100
300 09 / 33109
ON W ARLINGTON PL FROM N CLARK ST TO N ORCHARD ST
5.0
05/19/08
06/20/08
1,000 04/01/08
12/01/08
600
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 464
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 05 0043 / 5158
ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST
3.0
04/04/05
11/18/05
600 06/27/05
07/23/05
481
100
300 09 / 33109
ON W ARLINGTON PL FROM N LAKEVIEW AVE TO N CLARK ST
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
302 00 0079 / 5767
ON W ARMITAGE AVE FROM N HALSTED ST TO N CLARK ST
30.0
08/01/02
08/03/02
4,000 07/23/02
08/06/02
12,880
100
300 07 0043 / 5466
ON W BELDEN AVE FROM N LINCOLN PARK WEST TO N HALSTED ST
22.0
04/18/06
11/18/06
5,500 08/04/06
09/01/06
4,272
100
300 09 / 33109
ON W BLACKHAWK ST FROM N CLEVELAND AVE TO N LARRABEE ST
4.0
05/19/08
06/20/08
800 04/01/08
12/01/08
480
100
300 06 0108 / 5263
ON W CONCORD PL FROM N NORTH PARK AVE TO N SEDGWICK ST
3.0
08/01/03
08/08/03
560 08/01/03
08/15/03
587
100
300 09 / 33109
ON W DEMING PL FROM N CLARK ST TO N ORCHARD ST
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 05 0043 / 5158
ON W DICKENS AVE FROM N HALSTED ST TO N SHEFFIELD AVE
8.0
04/04/05
11/18/05
1,600 06/27/05
07/23/05
1,283
100
300 07 0043 / 5466
ON W DICKENS AVE FROM N LINCOLN AVE TO N HALSTED ST
15.0
04/18/06
11/18/06
3,750 08/04/06
09/01/06
2,913
100
300 03 0043 / 4914
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
14.50
07/26/04
08/09/04
4,725 07/01/04
08/10/04
2,961
100
300 03 0044 / 4915
ON W DIVERSEY PKWY FROM N RACINE AVE TO N LAKE SHORE DR
72.0
07/26/04
08/09/04
15,950 08/01/04
08/10/04
14,703
100
300 09 / 33109
ON W DRUMMOND PL FROM N CLARK ST TO N ORCHARD ST
2.0
05/19/08
06/20/08
400 04/01/08
12/01/08
240
100
300 06 0108 / 5263
ON W EUGENIE ST FROM N LA SALLE ST TO N SEDGWICK ST
12.0
08/05/03
08/12/03
2,220 08/01/03
08/15/03
2,350
100
300 05 0043 / 5158
ON W EUGENIE ST FROM N SEDGWICK ST TO N LARRABEE ST
9.0
04/04/05
11/18/05
1,800 06/27/05
07/23/05
1,443
100
300 09 / 33109
ON W EVERGREEN AVE FROM N WELLS ST TO N NORTH PARK AVE
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 06 0058 / 5229
ON W FULLERTON AVE FROM N CLARK ST TO N LINCOLN AVE
27.0
12/01/02
01/01/03
5,670 12/01/02
01/09/03
5,670
100
302 00 0079 / 5767
ON W FULLERTON AVE FROM N CLARK ST TO N RACINE AVE
101.60
12/01/01
12/22/01
12,800 04/20/01
05/03/01
12,700
100
300 07 0043 / 5466
ON W GRANT PL FROM N SEDGWICK ST TO N GENEVA TER
9.0
04/18/06
11/18/06
1,800 08/04/06
09/01/06
1,748
100
300 07 0043 / 5466
ON W KEMPER PL FROM N GENEVA TER TO N ORCHARD ST
3.0
04/18/06
11/18/06
600 08/04/06
09/01/06
582
100
300 09 / 33109
ON W LILL AVE FROM N HALSTED ST TO N LINCOLN AVE
5.0
05/19/08
06/20/08
1,000 04/01/08
12/01/08
600
100
300 07 0032 / 5455
ON W LILL AVE FROM N SHEFFIELD AVE TO N SEMINARY AVE
2.50
04/18/06
11/18/06
500 01/05/07
01/05/07
0
100
300 06 0108 / 5263
ON W MENOMONEE ST FROM N CLARK ST TO N SEDGWICK ST
20.0
08/05/03
08/12/03
3,715 08/01/03
08/20/03
3,917
100
300 05 0043 / 5158
ON W MENOMONEE ST FROM N SEDGWICK ST TO N LARRABEE ST
11.0
04/04/05
11/18/05
2,200 06/27/05
07/23/05
1,764
100
300 09 / 33109
ON W MONTANA ST FROM N LINCOLN AVE TO N RACINE AVE
9.0
05/19/08
06/20/08
1,800 04/01/08
12/01/08
1,080
100
300 06 0108 / 5263
ON W NORTH AVE FROM N CLARK ST TO N DEARBORN ST
8.50
07/01/03
07/07/03
2,000 06/20/03
06/30/03
1,925
100
300 05 0043 / 5158
ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST
3.0
04/04/05
11/18/05
600 06/27/05
07/23/05
481
100
300 09 / 33109
ON W ROSLYN PL FROM N LAKEVIEW AVE TO N CLARK ST
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 09 / 33109
ON W SCHILLER ST FROM N LA SALLE DR TO N WELLS ST
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 09 / 33109
ON W SCHUBERT AVE FROM N CLARK ST TO N HALSTED ST
14.0
05/19/08
06/20/08
2,800 04/01/08
12/01/08
1,680
100
300 09 / 33109
ON W SCHUBERT AVE FROM N DAYTON ST TO N SHEFFIELD AVE
3.0
05/19/08
06/20/08
600 04/01/08
12/01/08
360
100
300 06 0108 / 5263
ON W ST PAUL AVE FROM N NORTH PARK AVE TO N WELLS ST
3.0
08/01/03
08/07/03
560 08/01/03
08/20/03
587
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 465
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 05 0043 / 5158
ON W WEBSTER AVE FROM N HALSTED ST TO N SHEFFIELD AVE
23.0
04/04/05
11/18/05
4,600 06/27/05
07/23/05
3,687
100
300 07 0043 / 5466
ON W WEBSTER AVE FROM N LINCOLN PARK WEST TO N HALSTED ST
25.0
04/18/06
11/18/06
6,250 08/04/06
09/01/06
4,855
100
300 05 0043 / 5158
ON W WILLOW ST FROM N FERN CT TO N ST MICHAELS CT
7.0
04/04/05
11/18/05
1,400 06/27/05
07/23/05
1,122
100
300 05 0043 / 5158
ON W WILLOW ST FROM N HALSTED ST TO N SHEFFIELD AVE
2.50
04/04/05
11/18/05
500 06/27/05
07/23/05
401
100
300 05 0043 / 5158
ON W WILLOW ST FROM N LARRABEE ST TO N HALSTED ST
11.0
04/04/05
11/18/05
2,200 06/27/05
07/23/05
1,764
100
300 06 0108 / 5263
ON W WILLOW ST FROM N WELLS ST TO N SEDGWICK ST
12.0
08/02/03
08/09/03
2,220 08/01/03
08/21/03
2,350
100
300 06 0108 / 5263
ON W WISCONSIN ST FROM N CLARK ST TO N SEDGWICK ST
20.0
08/05/03
08/12/03
3,715 08/01/03
08/21/03
3,917
100
300 09 / 33109
ON W WRIGHTWOOD AVE FROM N CLARK ST TO N SHEFFIELD AVE
4.0
05/19/08
06/20/08
800 04/01/08
12/01/08
480
100
300 07 0043 / 5466
W BELDEN AVE AND N CAMBRIDGE AVE
3.0
04/18/06
11/18/06
600 08/04/06
09/01/06
582
100
Totals per Strt Light Pole Painting
1,187.65
Work Type: Strt Lighting
Blocks
300 06 0076 / 5239
1600 N CLYBOURN AVE
300 06 0078 / 5241
1600 N CLYBOURN AVE
300 06 0076 / 5239 303 00 0006 / 5783
230,695
06/01/00
09/15/00
58,500 07/05/00
07/25/00
66,504
100
04/01/98
12/01/98
51,000 07/05/00
07/25/00
11,552
100
1536 N SEDGWICK ST
06/01/00
09/15/00
58,500 05/22/00
06/15/00
66,504
100
2000 N SHEFFIELD AVE
08/01/97
12/01/97
60,000 08/01/97
04/30/98
76,547
100
1.0
1.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0238 / 5352
247,280
735 W WRIGHTWOOD AVE
228,000
221,107
Lamps 2,012.0
06/01/06
12/31/06
12,000 10/27/06
11/03/06
10,462
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 466
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2742 / 8928
98 E LA SALLE DR
302 00 0070 / 5758
100 E LA SALLE DR
302 00 0072 / 5760
1620 N HALSTED ST
1.0
805 06 2686 / 8872
1622 N HALSTED ST
48.0
03/11/91
805 06 2135 / 8321
1650 S CLARK ST
8.0
805 06 2268 / 8454
2495 S HALSTED ST
805 06 2270 / 8456
12/31/95
12/31/95
0 12/31/95
12/31/95
20,250
100
0 10/12/97
10/20/97
17,175
100
0 10/18/99
10/20/99
9,505
100
03/11/91
0 03/11/91
03/11/91
36,000
100
12/20/97
12/20/97
0 12/20/97
12/20/97
6,000
100
18.0
01/01/91
01/01/91
0 01/01/91
01/01/91
13,500
100
2495 S HALSTED ST
8.0
01/01/91
01/01/91
0 01/01/91
01/01/91
6,000
100
805 06 2754 / 8940
2495 S HALSTED ST
18.0
02/26/91
02/26/91
0 02/26/91
02/26/91
13,500
100
805 06 2710 / 8896
999 W FULLERTON AVE
28.0
06/16/94
06/16/94
0 06/16/94
06/16/94
21,000
100
805 06 2738 / 8924
40 W FULLERTON DR
14.0
01/01/90
01/01/90
0 01/01/90
01/01/90
10,500
100
300 06 0217 / 5337
735 W WRIGHTWOOD AVE
70.0
06/15/04
06/22/04
3,935 06/15/04
06/16/04
5,318
100
Totals per Underpass Lighting
27.0
240.0
3,935
158,748
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 467
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
300 06 0225 / 5340
2000 N CLYBOURN AVE
4.0
210 06 0130 / 4389
2330 N LINCOLN AVE
1.0
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0231 / 4470
W DIVISION ST AND N LA SALLE DR
300 06 0117 / 5271
2400 N CANNON DR
Totals per Left Turn Arrow
Work Type: Pedestrian Countdown Signal Install
09/02/02
10/31/02
5.0
17,250 08/14/02
10/14/02
14,369
100
0 10/10/01
10/10/01
3,979
100
17,250
18,348
Locations .0
03/01/08
12/01/08
15,516
1.0
20,000 10/29/99
1.0
35,516
11/15/99
Locations
N CLARK ST AND N LINCOLN AVE
1.0
300 11 / 32232
N CLARK ST AND N LINCOLN AVE
1.0
05/15/09
12/15/09
12,000
300 11 / 32232
N CLARK ST AND W FULLERTON PKWY
1.0
07/24/07
09/15/07
12,000 07/31/07
08/01/07
300 11 / 32232
N CLARK ST AND W WEBSTER AVE
1.0
08/01/07
08/02/07
12,000 07/26/07
300 11 / 32232
N HALSTED ST AND W WEBSTER AVE
1.0
06/25/07
07/26/07
12,000 06/25/07
300 11 / 32232
N LINCOLN AVE AND W WEBSTER AVE
1.0
300 11 / 32232
W ARMITAGE AVE AND N CLARK ST
1.0
06/15/07
07/30/07
12,000 07/10/07
07/11/07
300 11 / 32232
W ARMITAGE AVE AND N HALSTED ST
1.0
06/25/07
07/26/07
12,000 06/25/07
300 09 / 33109
W BELDEN AVE AND N CLARK ST
1.0
02/25/08
06/27/08
83,000 04/01/08
300 11 / 32232
W BELDEN AVE AND N CLARK ST
1.0
210 06 0240 / 4477
W DIVERSEY PKWY AND N SHERIDAN RD
6.0
11/06/06
09/20/07
210 06 0240 / 4477
W NORTH AVE AND N SEDGWICK ST
4.0
11/01/05
210 06 0207 / 4450
2350 N LINCOLN AVE
6.0
04/01/04
Totals per Pedestrian Countdown Signal Install
0 100
4,276
300 09 / 33109
Totals per Traffic
0 4,276
26.0
15,000 04/01/08
12/01/08
0
7
11,230
0
6,529
100
07/26/07
0
100
07/26/07
5,194
100
12,000
0
0
3,414
100
07/26/07
8,399
100
12/01/08
81,259
100
12,000
78,072
0
8,700 11/08/06
11/22/06
4,911
100
09/30/06
5,000 11/01/05
10/16/06
2,979
100
12/31/05
10,000 09/12/06
09/12/05
5,160
100
217,700
207,147
780,331
797,987
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 468
1/1/2008 AND 12/31/2008
Ward 43 Vi Daley CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Installation 300 11 / 32600
N CLARK ST AND N LINCOLN AVE
300 11 / 32600
N CLARK ST AND W FULLERTON PKWY
300 11 / 32600
Installations 1.0
09/08/07
01/04/08
11,520 07/23/07
07/25/07
0
100
.0
09/08/07
01/04/08
11,520 07/31/07
08/01/07
0
100
N CLARK ST AND W WEBSTER AVE
1.0
09/08/07
01/04/08
11,520 07/24/07
07/26/07
0
100
300 11 / 32600
N HALSTED ST AND W WEBSTER AVE
1.0
09/08/07
01/04/08
11,520 07/26/07
07/27/07
0
100
300 11 / 32600
N LINCOLN AVE AND W WEBSTER AVE
1.0
09/08/07
01/04/08
11,520 07/24/07
07/26/07
0
100
300 11 / 32600
W ARMITAGE AVE AND N CLARK ST
1.0
09/08/07
01/04/08
11,520 07/10/07
07/11/07
0
100
300 11 / 32600
W ARMITAGE AVE AND N HALSTED ST
1.0
09/08/07
01/04/08
11,520 07/25/07
07/26/07
0
100
300 11 / 32600
W BELDEN AVE AND N CLARK ST
1.0
09/08/07
01/04/08
11,520 02/25/08
06/05/08
6,529
100
Totals per Pedestrian Countdown Signal Installation
Work Type: Signals 300 06 0096 / 5258
735 W WRIGHTWOOD AVE
Work Type: TSM Install
7.0
92,160
6,529
Intersections 45.0
11/12/03
11/20/03
0 11/20/03
11/28/03
7,115
100
Locations
210 06 0013 / 4288
2100 N CLEVELAND AVE
1.0
02/17/99
09/01/99
259,000 12/15/98
02/15/99
221,697
100
210 06 0093 / 4355
2000 N CLYBOURN AVE
1.0
02/14/00
04/30/00
150,000 02/14/00
04/13/00
114,657
100
814 06 0254 / 16466
2331 N LINCOLN AVE
1.0
01/28/92
01/28/92
0 01/28/92
01/28/92
87,936
100
814 06 0389 / 16577
800 W ARMITAGE AVE
1.0
08/17/95
08/17/95
0 08/17/95
08/17/95
128,682
100
4.0
Totals per TSM Install
Work Type: Traffic Equipment Painting
409,000
552,972
Locations
300 07 0043 / 5466
ON N ASTOR ST FROM E DIVISION ST TO E NORTH AVE
6.0
04/18/06
11/18/06
1,800 08/04/06
09/01/06
1,165
100
300 07 0043 / 5466
ON N LA SALLE DR FROM W DIVISION ST TO W NORTH AVE
9.0
04/18/06
11/18/06
3,675 08/04/06
09/01/06
0
100
300 06 0108 / 5263
N HALSTED ST AND W DIVERSEY AVE
04/01/05
04/10/05
1,260
300 06 0108 / 5263
N WELLS ST AND W NORTH AVE
04/01/05
04/10/05
1,470
300 09 / 33109
W FULLERTON AVE AND N HALSTED ST
05/19/08
06/20/08
1.0 16.0
500 05/19/08
0 0 06/20/08
435
8,705
1,600
Totals per Construction Phase
2,413,330
2,361,353
Totals for Ward 43
2,419,930
2,380,102
Totals per Traffic Equipment Painting
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 469
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE
.0
02/01/06
07/31/06
0 02/01/06
300 06 / 32277
ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE
.0
04/01/08
08/30/08
0
0
0
300 06 / 32146
ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST
.0
05/01/07
10/31/07
4,000
2,000
100
300 06 / 32277
ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE
.0
04/01/08
08/30/08
210 06 0240 / 4477
W DIVERSEY PKWY AND N SHERIDAN RD
.0
10/10/05
07/31/06
300 06 / 32146
3600-3800 N LAKEWOOD AVE
.0
05/01/07
10/31/07
300 06 0292 / 5399
3128 N SHEFFIELD AVE
1.0
2,000 02/08/05
300 06 0292 / 5399
3140 N SHEFFIELD AVE
1.0
3,000 08/02/05
2.0
9,600
Totals per Design/Engineering
07/31/06
0 600 10/10/05
04/27/06
0
2,916
100
0
0
250
100
0
100
2,839 11/16/05
0 8,005
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 470
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 03 0044 / 4915
ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE
5.0
07/01/04
07/01/04
2,075 05/16/04
05/16/04
1,220
100
300 03 0044 / 4915
ON W WELLINGTON AVE FROM N RACINE AVE TO N SHEFFIELD AVE
7.0
08/10/04
08/10/04
2,825 05/25/04
05/25/04
1,448
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 05 0044 / 5159
ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST
300 06 0122 / 5275
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
Totals per 400 Watt Changeout
Work Type: Alley Lighting/Lamps
12.0
4,900
2,668
Fixtures 45.0
04/04/05
11/18/05
4,434 09/01/05
09/25/05
0
100
27.50
11/01/03
11/21/03
11,200 10/05/03
10/06/03
7,718
100
72.50
15,634
7,718
Installations
805 06 2007 / 8193
3722 N LAKEWOOD AVE
1.0
01/27/97
01/27/97
0 01/27/97
01/27/97
300
100
805 06 0623 / 6809
3135 N SEMINARY AVE
1.0
10/01/96
10/01/96
0 10/01/96
10/01/96
300
100
805 06 0877 / 7063
547 W BELMONT AVE
1.0
09/04/96
09/04/96
0 09/04/96
09/04/96
300
100
805 06 1671 / 7857
549 W BELMONT AVE
1.0
07/18/97
07/18/97
0 07/18/97
07/18/97
300
100
805 06 0878 / 7064
854 W BELMONT AVE
1.0
11/06/96
11/06/96
0 11/06/96
11/06/96
300
100
805 06 0863 / 7049
924 W BELMONT AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 0880 / 7066
924 W BELMONT AVE
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
300 06 0139 / 5289
1057 W BELMONT AVE
741.0
03/01/06
09/01/06
19,365 05/24/06
06/01/06
22,389
100
302 00 0092 / 5774
1057 W BELMONT AVE
6.0
0 03/21/01
12/14/01
1,414
100
805 06 0825 / 7011
426 W BRIAR PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0810 / 6996
450 W BRIAR PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1198 / 7384
1000 W DAKIN ST
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 1682 / 7868
1000 W DAKIN ST
1.0
11/19/96
11/19/96
0 11/19/96
11/19/96
300
100
805 06 1120 / 7306
938 W GEORGE ST
1.0
05/02/96
05/02/96
0 05/02/96
05/02/96
300
100
805 06 1074 / 7260
1503 W HENDERSON ST
1.0
12/17/96
12/17/96
0 12/17/96
12/17/96
300
100
805 06 1106 / 7292
1519 W HENDERSON ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0693 / 6879
816 W ROSCOE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0694 / 6880
820 W ROSCOE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0695 / 6881
938 W ROSCOE ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1689 / 7875
1115 W ROSCOE ST
1.0
07/02/97
07/02/97
0 07/02/97
07/02/97
300
100
Totals per Alley Lighting/Lamps
765.0
19,365
29,203
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 471
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0215 / 5336
1057 W BELMONT AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
1057 W BELMONT AVE
Work Type: Flood Light Install 300 06 0167 / 5306
W ADDISON ST AND N SHEFFIELD AVE
300 06 0071 / 5234
3843 N CLARK ST
302 00 0092 / 5774
656 W BARRY AVE
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0118 / 5272
3200 N SHEFFIELD AVE
Work Type: Ornamental - Piggyback Lighting 300 06 0122 / 5275
ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST
300 06 0122 / 5275
ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD
300 06 0122 / 5275
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
1057 W BELMONT AVE
Totals per Lighting/Electrical
Lamps 1,325.0
06/01/07
12/31/07
39,008 08/01/07
08/10/07
39,008
100
0 05/04/02
05/07/02
21,668
100
0 05/18/99
05/18/99
351
100
0 11/15/00
11/16/00
3,000
100
2.0
0 09/06/01
09/06/01
807
100
3.0
0
Installations 1,190.0
Fixtures 1.0 11/15/00
11/16/00
4,158
Projects 1.0
10/30/00
06/29/01
98,049 03/26/01
05/21/01
80,036
100
09/15/03
09/20/03
66,000 09/26/03
10/02/03
88,094
100
11/01/04
11/30/04
48,250 10/01/04
11/01/04
30,189
100
11/01/03
11/21/03
25,800 10/14/03
10/20/03
37,364
100
Fixtures 55.0
21.50 76.50
140,050
155,646
0
0
5,617,077
3,355,956
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 472
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 06 0308 / 5414
ON N BURLING ST FROM W DIVERSEY PKWY TO W OAKDALE AVE
2.0
03/27/06
05/27/06
142,196 03/16/06
05/18/06
99,896
100
300 11 / 32233
ON N CAMBRIDGE AVE FROM W BRIAR PL TO W BELMONT AVE
1.0
05/29/07
07/13/07
28,334 05/29/07
08/03/07
19,195
100
300 09 / 33110
ON N CAMBRIDGE AVE FROM W DIVERSEY PKWY TO W SURF ST
1.0
50,000 04/01/08
12/01/08
0
0
300 11 / 32233
ON N CLIFTON AVE FROM W WELLINGTON AVE TO W BELMONT AVE
3.0
06/11/07
09/07/07
187,500 06/11/07
09/19/07
114,078
100
300 07 0044 / 5467
ON N ELAINE PL FROM W ROSCOE ST TO W CORNELIA AVE
1.0
07/19/06
09/08/06
60,000 08/07/06
09/18/06
64,282
100
300 09 / 33110
ON N FREMONT ST FROM W CORNELIA AVE TO W ADDISON ST
1.0
65,000 04/01/08
12/01/08
0
0
300 11 / 32233
ON N KENMORE AVE FROM W WELLINGTON AVE TO W BELMONT AVE
3.0
187,500 06/11/07
09/19/07
114,078
100
300 11 / 32233
ON N MAGNOLIA AVE FROM W ADDISON ST TO W GRACE ST
2.0
0
0
300 09 / 33110
ON N PINE GROVE AVE FROM W DIVERSEY PKWY TO W SURF ST
1.0
0
0
300 06 / 32277
ON N RACINE AVE FROM W DIVERSEY PKWY TO W BELMONT AVE
0
0
300 09 / 33110
ON N RETA AVE FROM W CORNELIA AVE TO W ADDISON ST
1.0
300 11 / 32233
ON N SEMINARY AVE FROM W WELLINGTON AVE TO W BELMONT AVE
2.0
06/11/07
300 06 / 32146
ON N WAYNE AVE FROM W ADDISON ST TO W GRACE ST
2.0
300 11 / 32233
ON W ALDINE AVE FROM N HALSTED ST TO W SCHOOL ST
.0
300 07 0044 / 5467
ON W BARRY AVE FROM N BROADWAY TO N SHERIDAN RD
2.0
300 09 / 33110
ON W BARRY AVE FROM N HALSTED ST TO N SHEFFIELD AVE
2.0
300 07 0044 / 5467
ON W BRIAR PL FROM N BROADWAY TO N SHERIDAN RD
2.0
05/01/07
07/01/07
150,000 09/25/06
300 11 / 32233
ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST
.50
06/27/07
08/03/07
18,750 06/25/07
300 09 / 33110
ON W CORNELIA AVE FROM N HALSTED ST TO N WILTON AVE
1.0
65,000 04/01/08
300 06 0298 / 5405
ON W EDDY ST FROM N RACINE AVE TO N SOUTHPORT AVE
2.0
04/01/05
05/15/05
300 05 0044 / 5159
ON W HENDERSON ST FROM N SOUTHPORT AVE TO N LAKEWOOD AVE
1.0
04/04/05
300 05 0044 / 5159
ON W MELROSE ST FROM N RACINE AVE TO N SOUTHPORT AVE
2.0
04/04/05
300 09 / 33110
ON W NEWPORT AVE FROM N HALSTED ST TO N SHEFFIELD AVE
2.0
300 05 0044 / 5159
ON W NEWPORT AVE FROM N RACINE AVE TO N SOUTHPORT AVE
2.0
04/04/05
300 07 0044 / 5467
ON W OAKDALE AVE FROM N BROADWAY TO N SHERIDAN RD
2.0
300 06 / 32277
ON W OAKDALE AVE FROM N RACINE AVE TO N SHEFFIELD AVE
.0
300 05 0044 / 5159
ON W ROSCOE ST FROM N RACINE AVE TO N SOUTHPORT AVE
300 05 0044 / 5159 300 11 / 32233
.0
06/11/07
09/07/07
110,000 50,000 04/01/08 05/04/08
12/31/08
12/01/08
0 65,000 04/01/08
12/01/08
0
0
09/07/07
125,000 06/11/07
09/19/07
114,078
100
10/05/07
05/29/08
394,424
0
0
06/27/07
08/03/07
42,500 06/22/07
10/10/07
33,929
100
05/01/07
07/01/07
150,000 09/25/06
107,668
95
130,000 04/01/08
12/01/08
0
0
107,669
95
10/10/07
10,885
100
12/01/08
0
0
0 04/01/05
05/20/05
107,553
100
11/18/05
80,000 10/10/05
03/10/06
61,601
100
11/18/05
150,000 09/19/05
03/10/06
115,718
100
130,000 04/01/08
12/01/08
0
0
11/18/05
150,000 10/20/05
03/10/06
115,718
100
05/01/07
07/01/07
150,000 09/25/06
107,668
95
05/04/08
12/31/08
2.0
04/04/05
11/18/05
150,000 10/17/05
ON W SCHOOL ST FROM N RACINE AVE TO N SOUTHPORT AVE
2.0
04/04/05
11/18/05
ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE
.67
07/09/07
09/07/07
300 11 / 32235
ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE
.50
07/09/07
09/07/07
300 09 / 33110
ON W SURF ST FROM N BROADWAY TO N SHERIDAN RD
2.0
0
0
0
03/10/06
115,719
100
150,000 09/22/05
03/10/06
115,719
100
30,150 07/09/07
11/02/07
18,391
100
22,500 07/09/07
11/02/07
13,725
100
80,000 04/01/08
12/01/08
0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 473
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Staggered Lighting 300 11 / 32233
ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST
.50
07/09/07
09/07/07
22,500 07/09/07
11/02/07
13,725
100
300 11 / 32235
ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST
.50
07/09/07
09/07/07
21,250 07/09/07
11/02/07
13,725
100
300 07 0044 / 5467
ON W WELLINGTON AVE FROM N BROADWAY TO N SHERIDAN RD
2.0
05/01/07
07/01/07
150,000 09/25/06
107,669
95
300 06 / 32146
3600-3800 N LAKEWOOD AVE
2.0
09/05/07
05/29/08
394,424
0
95
3,702,028
1,692,687
50.67
Totals per Residntl Staggered Lighting
Blocks
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON N JANSSEN AVE FROM W ROSCOE ST TO W ADDISON ST
300 03 0044 / 4915
ON N SHEFFIELD AVE FROM W DIVERSEY PKWY TO W BELMONT AVE
300 06 0267 / 5375
ON W CORNELIA AVE FROM N RACINE AVE TO N SOUTHPORT AVE
300 03 0044 / 4915
2.0
04/08/03
06/08/03
166,978 04/08/03
06/02/03
152,353
100
09/15/04
11/15/04
400,000 09/07/04
02/11/05
232,307
100
2.0
03/15/04
05/15/04
147,242 03/05/04
04/27/04
145,026
100
ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE
2.0
09/15/04
11/15/04
150,000 09/07/04
01/07/05
67,996
100
300 06 0069 / 5233
ON W FLETCHER ST FROM N CLARK ST TO N SHEFFIELD AVE
2.0
08/01/04
10/01/04
203,500 09/08/04
02/23/05
73,656
100
300 06 0069 / 5233
ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY
1.0
10/15/04
12/15/04
27,500 12/01/04
12/23/04
36,344
100
300 06 0276 / 5384
ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY
10/15/04
12/15/04
27,500 10/22/04
12/23/04
36,344
100
9.0
Totals per Residntl Strt Lighting/Lamps
Work Type: Strt Light Pole Painting
1,122,720
744,025
Locations
300 06 0108 / 5263
ON N ASHLAND AVE FROM W ROSCOE ST TO W ADDISON ST
19.0
10/03/03
10/05/03
4,620 10/17/03
10/18/03
4,620
100
300 06 0108 / 5263
ON N CLARK ST FROM W BELMONT AVE TO W ADDISON ST
56.0
08/03/03
08/15/03
24,400 08/04/03
08/22/03
23,671
100
300 06 0108 / 5263
42.0
08/03/03
08/15/03
21,400 08/15/03
08/22/03
8,330
100
300 05 0044 / 5159
ON N LAKE SHORE DR WEST FROM W DIVERSEY PKWY TO W BELMONT AVE ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST
300 06 0108 / 5263
ON N SOUTHPORT AVE FROM W BELMONT AVE TO W GRACE ST
300 04 0216 / 5114
29.0
04/04/05
11/18/05
6,273
6,273
100
21.50
10/01/03
10/22/03
9,520 09/20/03
09/26/03
9,520
100
ON W BELMONT AVE FROM N LINCOLN AVE TO N SOUTHPORT AVE
17.0
05/01/06
11/01/06
3,677 05/17/06
06/25/06
3,677
100
302 00 0076 / 5764
3400-3500 N CLARK ST
32.0
04/01/00
12/31/00
0
544
302 00 0076 / 5764
300-400 W DIVERSEY AVE
10.0
09/01/00
12/31/00
0
170
69,890
56,805
Totals per Strt Light Pole Painting
Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0122 / 5275
ON W BELMONT AVE FROM N HALSTED ST TO N SHEFFIELD AVE
226.50
Blocks 7.0
11/01/03
12/31/03
394,607 09/15/03
06/15/04
501,452
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 474
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
1057 W BELMONT AVE
Work Type: Underpass Lighting 300 06 0217 / 5337
1057 W BELMONT AVE
Lamps 1,855.0
03/01/04
12/01/04
9,646 11/02/06
11/27/06
20,201
100
06/23/04
06/24/04
1,180 06/16/04
06/16/04
681
100
Fixtures 21.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 475
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: New Signal
Locations
210 06 0171 / 4420
N HALSTED ST AND W WAVELAND AVE
.50
08/01/06
04/01/07
108,000 04/25/07
210 06 0171 / 4420
N LINCOLN AVE AND W SCHOOL ST
.50
08/02/07
09/20/07
57,120 04/19/07
1.0
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install 210 06 0240 / 4477
W DIVERSEY PKWY AND N SHERIDAN RD
Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276
W DIVERSEY PKWY AND N SHEFFIELD AVE
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N ASHLAND AVE AND W SCHOOL ST
Work Type: Signals 300 06 0096 / 5258
1057 W BELMONT AVE
Work Type: TSM Install
05/24/07
165,120
53,026
100
91,967
85
144,993
Locations 6.0
11/06/06
09/20/07
8,700 11/08/06
04/01/07
02/28/08
5,760
11/22/06
4,911
100
0
0
Installations .0
Crossings 1.0
4,000 12/10/01
01/18/02
9,284
100
0 10/07/03
10/14/03
6,483
100
Intersections 41.0
11/15/03
11/21/03
Locations
210 06 0020 / 4295
N BROADWAY AND W CORNELIA AVE
02/01/01
03/15/01
67,500 02/14/01
04/20/01
38,582
100
210 06 0020 / 4295
W BARRY AVE AND N SHERIDAN RD
01/25/00
03/15/00
153,466 01/26/00
02/29/00
100,439
100
814 06 0134 / 16348
3000 N HALSTED ST
1.0
04/08/93
04/08/93
0 04/08/93
04/08/93
112,423
100
271 00 0045 / 4794
3500 N HALSTED ST
1.0
0 08/01/97
08/15/99
201,000
210 06 0019 / 4294
3800 N SOUTHPORT AVE
1.0
290,000 07/20/99
02/06/00
239,714
100
814 06 0390 / 16578
800 W BELMONT AVE
1.0
0 07/06/95
07/06/95
149,081
100
07/06/95
07/06/95
4.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 05 0044 / 5159
ON N SHERIDAN RD FROM W BELMONT AVE TO W SURF ST
300 06 0108 / 5263
N HALSTED ST AND W DIVERSEY AVE
Totals per Traffic Equipment Painting Totals per Traffic Totals per Construction Phase
510,966
841,239
Locations 24.0
24.0
04/04/05
11/18/05
10,238
10,238
04/01/05
04/10/05
1,260
0
11,498
10,238
706,044
1,017,148
6,323,121
4,373,103
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 476
1/1/2008 AND 12/31/2008
Ward 44 Thomas M. Tunney CIP/CPM Number Totals for Ward 44
Street Address
No of Units
Start
WIP Estimate End
Cost 6,332,721
Start
WIP Actual (to Date) End
Cost 4,381,108
% Cmplt
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 477
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0274 / 5382
ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST
.0
07/01/04
12/31/04
0 03/22/05
10/05/05
3,567
100
300 06 0308 / 5414
ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
283
100
210 06 0127 / 4386
N AUSTIN AVE AND W FOSTER AVE
1.0
12/15/05
03/15/06
0 12/15/05
02/14/06
940
100
210 06 0127 / 4386
N CICERO AVE AND W LAWRENCE AVE
.0
12/15/05
03/15/06
0
0
0
0
4,790
Totals per Design/Engineering
1.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 478
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
302 00 0092 / 5774
ON N LAVERGNE AVE FROM W IRVING PARK RD TO N DICKINSON AVE
7.0
03/02/02
03/02/02
1,470 02/28/02
02/28/02
1,421
100
302 00 0092 / 5774
4000 N LAPORTE AVE
4.0
03/03/02
03/03/02
840 02/28/02
02/28/02
812
100
302 00 0092 / 5774
4900 W BELLE PLAINE AVE
5.0
03/03/02
03/03/02
1,050 02/28/02
02/28/02
1,015
100
Totals per 250 Watt Changeout Totals per Lighting/Electrical
16.0
3,360
3,248
2,073,493
1,836,301
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 479
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0846 / 7032
4816 N AVONDALE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0847 / 7033
4830 N AVONDALE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0848 / 7034
4846 N AVONDALE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0811 / 6997
5851 N CENTRAL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0397 / 6583
4337 N CICERO AVE
1.0
05/21/96
05/21/96
0 05/21/96
05/21/96
300
100
805 06 1088 / 7274
4588 N ELSTON AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0651 / 6837
5901 N ELSTON AVE
1.0
01/25/96
01/25/96
0 01/25/96
01/25/96
300
100
805 06 1159 / 7345
4336 N KEDVALE AVE
1.0
04/03/96
04/03/96
0 04/03/96
04/03/96
300
100
805 06 1183 / 7369
4505 N KEOKUK AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2031 / 8217
4463 N KILDARE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0358 / 6544
4635 N LECLAIRE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1965 / 8151
4831 N LIPPS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 2093 / 8279
4835 N LIPPS AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1854 / 8040
4607 N LOWELL AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1881 / 8067
5011 N MAJOR AVE
1.0
09/11/96
09/11/96
0 09/11/96
09/11/96
300
100
805 06 1824 / 8010
5553 N MC VICKER AVE
1.0
12/12/96
12/12/96
0 12/12/96
12/12/96
300
100
805 06 1842 / 8028
5723 N MC VICKER AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1822 / 8008
6036 N MENARD AVE
1.0
08/01/96
08/01/96
0 08/01/96
08/01/96
300
100
805 06 1924 / 8110
4307 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 1942 / 8128
4411 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 1963 / 8149
4441 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 1944 / 8130
4659 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
300 06 0139 / 5289
4849 N MILWAUKEE AVE
2,061.0
03/01/06
09/01/06
47,298 05/20/06
06/01/06
62,271
100
302 00 0092 / 5774
4849 N MILWAUKEE AVE
13.0
0 01/25/01
01/18/02
3,063
100
805 06 1945 / 8131
5119 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 1946 / 8132
5147 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 1947 / 8133
6349 N MILWAUKEE AVE
1.0
06/24/96
06/24/96
0 06/24/96
06/24/96
300
100
805 06 0884 / 7070
4907 W BERTEAU AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1070 / 7256
5351 W DEVON AVE
1.0
11/13/96
11/13/96
0 11/13/96
11/13/96
300
100
805 06 1704 / 7890
5921 W GIDDINGS ST
1.0
06/23/97
06/23/97
0 06/23/97
06/23/97
300
100
302 00 0092 / 5774
5931 W GIDDINGS ST
1.0
0 06/14/01
06/14/01
236
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 480
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1189 / 7375
4710 W HUTCHINSON ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0318 / 6504
5850 W LAWRENCE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0333 / 6519
4359 W LELAND AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0334 / 6520
5901 W LELAND AVE
1.0
09/25/96
09/25/96
0 09/25/96
09/25/96
300
100
805 06 0528 / 6714
5811 W PETERSON AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
5205 N MILWAUKEE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4849 N MILWAUKEE AVE
Work Type: Ornamental Lighting 300 06 0157 / 5297
5100 N MILWAUKEE AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
5205 N MILWAUKEE AVE
Work Type: Residntl Staggered Lighting
2,108.0
47,298
Lamps 2,320.0
06/01/07
12/31/07
68,300 09/01/07
09/21/07
68,300
100
0 04/20/02
04/23/02
38,874
100
0 03/08/99
05/20/99
45,516
Installations 2,135.0
Blocks 1.0
Lamps .0
03/01/08
12/01/08
04/04/05
11/18/05
0
0
0
Blocks
300 09 / 33111
ON N LARAMIE AVE FROM W ARGYLE ST TO W CARMEN AVE
2.0
300 05 0045 / 5160
ON N LIEB AVE FROM W GETTYSBURG ST TO N LONG AVE
1.0
300 09 / 33111
ON N LINDER AVE FROM W BALMORAL AVE TO W CATALPA AVE
2.0
300 05 0045 / 5160
ON N LONG AVE FROM W GETTYSBURG ST TO N LIEB AVE
1.0
04/04/05
11/18/05
300 05 0045 / 5160
ON W AINSLIE ST FROM N MENARD AVE TO N MARMORA AVE
2.0
04/04/05
11/18/05
300 06 0298 / 5405
ON W ARDMORE AVE FROM N MELVINA AVE TO N AUSTIN AVE
2.0
300 05 0045 / 5160
ON W STRONG ST FROM N MENARD AVE TO N MARMORA AVE
2.0
04/04/05
300 05 0045 / 5160
ON W SUNNYSIDE AVE FROM N KOSTNER AVE TO N LOWELL AVE
2.0
300 07 0045 / 5468
ON W SUNNYSIDE AVE FROM N LINDER AVE TO N CENTRAL AVE
300 06 0308 / 5414
ON W SUNNYSIDE AVE FROM N LOCKWOOD AVE TO N LINDER AVE
300 07 0045 / 5468
ON W SUNNYSIDE AVE FROM N LOWELL AVE TO N KOSTNER AVE
Totals per Residntl Staggered Lighting
75,470
20,000 04/01/08
12/01/08
0
0
75,000 09/12/05
11/04/05
37,904
100
20,000 04/01/08
12/01/08
0
0
75,000 09/12/05
11/04/05
37,904
100
100,000 07/12/05
09/22/05
70,482
100
0 07/27/05
10/03/05
94,527
100
11/18/05
100,000 07/12/05
09/22/05
70,482
100
04/04/05
11/18/05
100,000 09/01/05
10/19/05
69,763
100
1.0
04/15/07
05/15/07
50,000 10/25/06
04/06/07
0
100
2.0
03/16/06
12/31/06
221,872 10/25/06
12/29/06
119,086
100
.0
03/01/06
12/31/06
0
0
0
761,872
500,148
17.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 481
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 06 0235 / 5349
ON N LAVERGNE AVE FROM W MONTROSE AVE TO W WILSON AVE
2.0
06/15/03
08/15/03
144,200 06/06/03
07/24/03
151,269
100
300 06 0267 / 5375
ON W WILSON AVE FROM N LAVERGNE AVE TO N LECLAIRE AVE
2.0
08/01/04
10/01/04
150,872 07/22/04
09/16/04
138,802
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
5025 N LARAMIE AVE
Work Type: Strt Light Pole Painting
4.0
295,072
Locations 0 03/14/01
1.0
ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MENARD AVE
15.0
09/01/00
12/31/00
300 04 0216 / 5114
ON W LAWRENCE AVE FROM N CENTRAL AVE TO N MILWAUKEE AVE
34.0
05/01/06
11/01/06
Work Type: Strt Lighting
03/14/01
378
07/24/06
7,354
100
Locations
302 00 0076 / 5764
Totals per Strt Light Pole Painting
290,071
49.0
0 7,354 05/17/06
255
7,354
100
7,609
Blocks
300 06 0246 / 5356
ON N LARNED AVE FROM N LIEB AVE TO N LYNCH AVE
1.0
08/01/04
12/01/04
157,142 10/27/04
03/24/06
83,659
100
300 06 0246 / 5356
ON N LAVERGNE AVE FROM W WINNEMAC AVE TO W ARGYLE ST
.50
08/01/04
12/01/04
157,143 10/27/04
03/24/06
83,659
100
300 06 0246 / 5356
ON N LAVERGNE AVE FROM W WINONA ST TO W CARMEN AVE
.50
05/01/04
12/31/04
157,143 10/27/04
03/24/06
83,659
100
300 06 0274 / 5382
ON N LUNA AVE FROM W LAWRENCE AVE TO W GIDDINGS ST
1.0
04/20/06
05/16/06
75,000 04/20/06
05/16/06
61,256
100
300 06 0246 / 5356
ON W ARDMORE AVE FROM N MILTIMORE AVE TO N MILWAUKEE AVE
2.0
08/01/04
12/01/04
157,143 10/27/04
03/24/06
83,659
100
300 06 0246 / 5356
ON W CATALPA AVE FROM N CENTRAL AVE TO N LOTUS AVE
1.50
08/01/04
12/01/04
157,143 10/27/04
03/24/06
83,659
100
6.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
4849 N MILWAUKEE AVE
860,714
479,551
Lamps 2,532.0
03/01/04
12/01/04
13,166 11/15/06
11/27/06
27,573
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 482
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
805 06 2304 / 8490
5152 N CENTRAL AVE
0 07/05/96
07/05/96
16,500
100
302 00 0070 / 5758
4450 N CICERO AVE
0 06/12/97
06/19/97
16,511
100
302 00 0070 / 5758
4500 N CICERO AVE
0 06/12/97
06/19/97
4,554
100
805 06 2167 / 8353
4505 N CICERO AVE
14.0
06/19/97
06/19/97
0 06/19/97
06/19/97
10,500
100
805 06 2170 / 8356
4505 N CICERO AVE
13.0
06/19/97
06/19/97
0 06/19/97
06/19/97
9,750
100
805 06 2657 / 8843
4830 N CICERO AVE
18.0
07/09/93
07/09/93
0 07/09/93
07/09/93
13,500
100
805 06 2566 / 8752
5290 N ELSTON AVE
28.0
03/27/95
03/27/95
0 03/27/95
03/27/95
21,000
100
805 06 2441 / 8627
5688 N FOREST GLEN AVE
12.0
09/12/95
09/12/95
0 09/12/95
09/12/95
9,000
100
300 06 0217 / 5337
4849 N MILWAUKEE AVE
291.0
06/25/04
07/07/04
16,357 06/17/04
06/25/04
17,312
100
805 06 2567 / 8753
5000 N MILWAUKEE AVE
42.0
04/25/95
04/25/95
0 04/25/95
04/25/95
31,500
100
805 06 2326 / 8512
4905 W AINSLIE ST
10.0
05/07/96
05/07/96
0 05/07/96
05/07/96
7,500
100
805 06 2877 / 9063
5201 W AINSLIE ST
10.0
05/04/94
05/04/94
0 05/04/94
05/04/94
7,500
100
805 06 2330 / 8516
4901 W ARGYLE ST
9.0
04/28/96
04/28/96
0 04/28/96
04/28/96
6,750
100
805 06 2303 / 8489
5001 W CARMEN AVE
10.0
05/07/96
05/07/96
0 05/07/96
05/07/96
7,500
100
805 06 2435 / 8621
5099 W FOSTER AVE
14.0
05/22/92
05/22/92
0 05/22/92
05/22/92
10,500
100
302 00 0070 / 5758
5700 W FOSTER AVE
0 05/22/97
05/29/97
13,414
100
805 06 2162 / 8348
5751 W FOSTER AVE
22.0
05/29/97
05/29/97
0 05/29/97
05/29/97
16,500
100
805 06 2672 / 8858
4801 W LAWRENCE AVE
20.0
11/15/94
11/15/94
0 11/15/94
11/15/94
15,000
100
805 06 2241 / 8427
4901 W LAWRENCE AVE
14.0
09/16/96
09/16/96
0 09/16/96
09/16/96
10,500
100
805 06 2878 / 9064
5150 W LAWRENCE AVE
12.0
03/24/94
03/24/94
0 03/24/94
03/24/94
9,000
100
805 06 2909 / 9095
4701 W MONTROSE AVE
10.0
05/29/92
05/29/92
0 05/29/92
05/29/92
7,500
100
302 00 0071 / 5759
4740 W MONTROSE AVE
0 05/12/99
05/19/99
13,772
100
805 06 2371 / 8557
4810 W WILSON AVE
14.0
09/14/95
09/14/95
0 09/14/95
09/14/95
10,500
100
805 06 2372 / 8558
4810 W WILSON AVE
18.0
09/14/95
09/14/95
0 09/14/95
09/14/95
13,500
100
Totals per Underpass Lighting
22.0
603.0
07/05/96
07/05/96
16,357
299,563
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 483
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install 210 06 0130 / 4389
N AUSTIN AVE AND N ELSTON AVE
Work Type: Left Turn Arrow
Locations 1.0
0 11/05/02
11/05/02
8,539
100
75,000 03/30/06
08/15/06
80,221
100
Locations
210 06 0127 / 4386
N AUSTIN AVE AND W FOSTER AVE
1.0
210 06 0127 / 4386
N CICERO AVE AND W LAWRENCE AVE
.50
300 06 0199 / 5324
W MONTROSE AVE AND N LARAMIE AVE
.50
11/01/01
11/28/01
3,078 11/07/01
210 06 0074 / 4338
4800 W LAWRENCE AVE
1.0
02/01/03
03/01/03
50,000 01/16/03
Totals per Left Turn Arrow
Work Type: New Signal 210 06 0075 / 4339
300 06 0096 / 5258 Totals per Traffic
4849 N MILWAUKEE AVE
11/01/06
47,500
3.0
0
0
11/08/01
4,980
100
01/30/03
65,766
100
175,578
150,967
Locations
W MONTROSE AVE AND N KNOX AVE
Work Type: Signals
10/01/06
09/01/04
11/01/04
90,500 07/26/04
07/07/05
114,304
100
11/15/03
11/25/03
0 10/01/03
10/08/03
10,120
100
Intersections 64.0
341,078
1,975,281
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 484
1/1/2008 AND 12/31/2008
Ward 45 Patrick J. Levar CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: TSM Install
Locations
210 06 0072 / 4336
W GRACE ST AND N LARAMIE AVE
.50
02/12/01
04/12/01
75,000 02/01/01
04/02/01
72,768
100
814 06 0363 / 16555
5600 N CENTRAL AVE
1.0
08/06/97
09/02/97
0 08/06/97
09/02/97
115,183
100
814 06 0202 / 16414
3800 N CICERO AVE
1.0
08/21/90
08/21/90
0 08/21/90
08/21/90
95,000
100
814 06 0226 / 16438
4000 N CICERO AVE
1.0
08/21/90
08/21/90
0 08/21/90
08/21/90
37,173
100
814 06 0225 / 16437
4200 N CICERO AVE
1.0
09/07/90
09/07/90
0 09/07/90
09/07/90
37,173
100
814 06 0173 / 16385
4400 N CICERO AVE
1.0
09/11/90
09/11/90
0 09/11/90
09/11/90
95,000
100
814 06 0222 / 16434
5200 N CICERO AVE
1.0
02/07/92
02/07/92
0 02/07/92
02/07/92
40,173
100
814 06 0280 / 16492
5200 N ELSTON AVE
1.0
10/28/91
10/28/91
0 10/28/91
10/28/91
134,857
100
814 06 0163 / 16375
5770 N FOREST GLEN AVE
1.0
12/03/91
12/03/91
0 12/03/91
12/03/91
96,000
100
814 06 0109 / 16324
4400 N KILBOURN AVE
1.0
07/29/94
07/29/94
0 07/29/94
07/29/94
59,132
100
814 06 0339 / 16538
4400 N KOSTNER AVE
1.0
03/09/92
03/09/92
0 03/09/92
03/09/92
73,893
100
814 06 0157 / 16371
4400 N LARAMIE AVE
1.0
09/15/92
09/15/92
0 09/15/92
09/15/92
95,000
100
814 06 0171 / 16383
5199 N LARAMIE AVE
1.0
02/10/92
02/10/92
0 02/10/92
02/10/92
96,000
100
814 06 0172 / 16384
5199 N LECLAIRE AVE
1.0
02/19/92
02/19/92
0 02/19/92
02/19/92
96,000
100
814 06 0170 / 16382
5200 N LONG AVE
1.0
02/18/92
02/18/92
0 02/18/92
02/18/92
96,000
100
814 06 0167 / 16379
5750 W FOSTER AVE
1.0
02/14/92
02/14/92
0 02/14/92
02/14/92
96,000
100
814 06 0379 / 16569
6400 W HIGGINS AVE
1.0
03/01/97
03/01/97
0 03/01/97
04/01/97
136,000
100
814 06 0179 / 16391
4730 W WILSON AVE
1.0
11/04/92
11/04/92
0 11/04/92
11/04/92
105,000
100
814 06 0178 / 16390
4770 W WILSON AVE
1.0
10/22/93
10/22/93
0 10/22/93
10/22/93
115,000
100
18.50
75,000
1,691,352
Totals per Construction Phase
2,414,571
3,811,582
Totals for Ward 45
2,414,571
3,816,372
Totals per TSM Install
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 485
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
3,010
100
300 06 / 32146
ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE
.0
05/01/07
10/31/07
3,900 07/13/07
08/20/07
3,500
100
300 06 / 32146
ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE
.0
05/01/07
10/31/07
3,900 07/02/07
08/10/07
2,000
100
210 06 0023 / 4298
N BROADWAY AND W MONTROSE AVE
1.0
02/06/02
04/02/02
5,000 02/06/02
07/26/06
3,760
100
300 06 0292 / 5399
4258 N BROADWAY
1.0
1,000 03/02/05
08/24/05
747
100
300 06 0292 / 5399
4700 N MARINE DR
1.0
2,000 01/05/05
03/14/05
1,197
100
Totals per Design/Engineering
3.0
01/31/05
02/25/05
15,800
14,214
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 486
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 400 Watt Changeout 300 06 0122 / 5275
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
Totals per Lighting/Electrical
Fixtures 8.82
12/15/03
12/21/03
3,528 12/09/03 5,495,724
12/14/03
2,563 5,111,611
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 487
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1296 / 7482
4819 N ASHLAND AVE
302 00 0083 / 5768
4839 N ASHLAND AVE
805 06 1300 / 7486
4839 N ASHLAND AVE
302 00 0083 / 5768
4857 N ASHLAND AVE
805 06 1305 / 7491
4857 N ASHLAND AVE
302 00 0083 / 5768
4879 N ASHLAND AVE
805 06 1281 / 7467
4879 N ASHLAND AVE
302 00 0083 / 5768
4913 N ASHLAND AVE
805 06 1284 / 7470
4913 N ASHLAND AVE
302 00 0083 / 5768
5013 N ASHLAND AVE
805 06 1286 / 7472
5013 N ASHLAND AVE
302 00 0083 / 5768
5043 N ASHLAND AVE
805 06 1287 / 7473
5043 N ASHLAND AVE
1.0
12/05/97
805 06 0819 / 7005
4449 N BROADWAY
1.0
300 06 0096 / 5258
4544 N BROADWAY
575.0
302 00 0092 / 5774
4544 N BROADWAY
11.0
302 00 0083 / 5768
4821 N CLARK ST
805 06 1285 / 7471
4921 N CLARK ST
302 00 0083 / 5768
5044 N CLARK ST
805 06 1288 / 7474
5044 N CLARK ST
302 00 0083 / 5768
5050 N CLARK ST
805 06 1289 / 7475
5050 N CLARK ST
302 00 0084 / 5769
4519 N DOVER ST
805 06 1337 / 7523
4519 N DOVER ST
302 00 0084 / 5769
4529 N DOVER ST
805 06 1338 / 7524
4529 N DOVER ST
302 00 0084 / 5769
4553 N DOVER ST
805 06 1343 / 7529
4553 N DOVER ST
302 00 0084 / 5769
4601 N DOVER ST
805 06 1344 / 7530
4601 N DOVER ST
302 00 0084 / 5769
4641 N DOVER ST
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
266
100
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
266
100
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
266
100
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
267
100
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
267
100
0 12/05/97
12/05/97
300
100
0 12/04/97
12/04/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
03/01/03
09/01/03
15,019 03/01/06
09/01/06
17,373
0
0 01/16/01
01/16/02
2,592
100
0 11/18/97
11/18/97
266
100
0 12/05/97
12/05/97
300
100
0 11/18/97
11/18/97
266
100
0 12/05/97
12/05/97
300
100
0 11/18/97
11/18/97
266
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 488
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 1324 / 7510
4641 N DOVER ST
302 00 0084 / 5769
4751 N DOVER ST
805 06 1315 / 7501
4751 N DOVER ST
302 00 0084 / 5769
4755 N DOVER ST
805 06 1318 / 7504
4755 N DOVER ST
302 00 0084 / 5769
4000 N KENMORE AVE
805 06 1383 / 7569
4000 N KENMORE AVE
302 00 0084 / 5769
4012 N KENMORE AVE
805 06 1385 / 7571
4012 N KENMORE AVE
302 00 0084 / 5769
4022 N KENMORE AVE
805 06 1387 / 7573
4022 N KENMORE AVE
302 00 0084 / 5769
4026 N KENMORE AVE
805 06 1389 / 7575
4026 N KENMORE AVE
302 00 0084 / 5769
4030 N KENMORE AVE
805 06 1390 / 7576
4030 N KENMORE AVE
302 00 0084 / 5769
4048 N KENMORE AVE
805 06 1392 / 7578
4048 N KENMORE AVE
302 00 0084 / 5769
4058 N KENMORE AVE
805 06 1395 / 7581
4058 N KENMORE AVE
302 00 0084 / 5769
4068 N KENMORE AVE
805 06 1366 / 7552
4068 N KENMORE AVE
302 00 0084 / 5769
4124 N KENMORE AVE
805 06 1369 / 7555
4124 N KENMORE AVE
302 00 0084 / 5769
4126 N KENMORE AVE
805 06 1370 / 7556
4126 N KENMORE AVE
302 00 0084 / 5769
4130 N KENMORE AVE
805 06 1371 / 7557
4130 N KENMORE AVE
302 00 0084 / 5769
4132 N KENMORE AVE
805 06 1372 / 7558
4132 N KENMORE AVE
302 00 0084 / 5769
4146 N KENMORE AVE
805 06 1373 / 7559
4146 N KENMORE AVE
Installations 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/08/98
06/08/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/15/98
06/15/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 489
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 302 00 0084 / 5769
4148 N KENMORE AVE
805 06 1375 / 7561
4148 N KENMORE AVE
302 00 0084 / 5769
4218 N KENMORE AVE
805 06 1376 / 7562
4218 N KENMORE AVE
302 00 0084 / 5769
4228 N KENMORE AVE
805 06 1377 / 7563
4228 N KENMORE AVE
302 00 0084 / 5769
4305 N KENMORE AVE
805 06 1378 / 7564
4305 N KENMORE AVE
302 00 0084 / 5769
4306 N KENMORE AVE
805 06 1379 / 7565
4306 N KENMORE AVE
302 00 0084 / 5769
4326 N KENMORE AVE
805 06 1380 / 7566
4326 N KENMORE AVE
302 00 0084 / 5769
4342 N KENMORE AVE
805 06 1351 / 7537
4342 N KENMORE AVE
302 00 0084 / 5769
4347 N KENMORE AVE
805 06 1352 / 7538
4347 N KENMORE AVE
302 00 0084 / 5769
4353 N KENMORE AVE
805 06 1353 / 7539
4353 N KENMORE AVE
302 00 0084 / 5769
4621 N KENMORE AVE
805 06 1349 / 7535
4621 N KENMORE AVE
302 00 0084 / 5769
4631 N KENMORE AVE
805 06 1321 / 7507
4631 N KENMORE AVE
302 00 0084 / 5769
4721 N KENMORE AVE
805 06 1331 / 7517
4721 N KENMORE AVE
302 00 0084 / 5769
4722 N KENMORE AVE
805 06 1334 / 7520
4722 N KENMORE AVE
302 00 0084 / 5769
4730 N KENMORE AVE
805 06 1335 / 7521
4730 N KENMORE AVE
302 00 0084 / 5769
4741 N KENMORE AVE
805 06 1311 / 7497
4741 N KENMORE AVE
302 00 0084 / 5769
4758 N KENMORE AVE
Installations 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/22/98
06/22/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/25/98
06/25/98
275
100
0 12/05/97
12/05/97
300
100
0 06/29/98
06/29/98
275
100
0 12/05/97
12/05/97
300
100
0 06/29/98
06/29/98
275
100
0 12/05/97
12/05/97
300
100
0 06/29/98
06/29/98
275
100
0 12/05/97
12/05/97
300
100
0 06/29/98
06/29/98
275
100
0 12/05/97
12/05/97
300
100
0 06/29/98
06/29/98
275
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 490
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 1292 / 7478
4758 N KENMORE AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1148 / 7334
4801 N KENMORE AVE
1.0
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
805 06 1176 / 7362
4801 N KENMORE AVE
1.0
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
302 00 0084 / 5769
4817 N KENMORE AVE
0 06/29/98
06/29/98
275
100
805 06 1295 / 7481
4817 N KENMORE AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4859 N KENMORE AVE
0 06/29/98
06/29/98
275
100
805 06 1276 / 7462
4859 N KENMORE AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4419 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1359 / 7545
4419 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4453 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1363 / 7549
4453 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4541 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1340 / 7526
4541 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4639 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1323 / 7509
4639 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4715 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1329 / 7515
4715 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4719 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1330 / 7516
4719 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4749 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1313 / 7499
4749 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4755 N MAGNOLIA AVE
0 07/07/98
07/07/98
275
100
805 06 1319 / 7505
4755 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
4816 N MAGNOLIA AVE
0 11/24/97
11/24/97
266
100
805 06 1294 / 7480
4816 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
4834 N MAGNOLIA AVE
0 11/24/97
11/24/97
266
100
805 06 1299 / 7485
4834 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
4850 N MAGNOLIA AVE
0 11/24/97
11/24/97
266
100
805 06 1303 / 7489
4850 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
4872 N MAGNOLIA AVE
0 11/24/97
11/24/97
267
100
805 06 1279 / 7465
4872 N MAGNOLIA AVE
0 12/05/97
12/05/97
300
100
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 491
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 302 00 0083 / 5768
4886 N MAGNOLIA AVE
805 06 1282 / 7468
4886 N MAGNOLIA AVE
302 00 0084 / 5769
4400 N MALDEN ST
805 06 1354 / 7540
4400 N MALDEN ST
302 00 0084 / 5769
4401 N MALDEN ST
805 06 1356 / 7542
4401 N MALDEN ST
302 00 0084 / 5769
4418 N MALDEN ST
805 06 1358 / 7544
4418 N MALDEN ST
302 00 0084 / 5769
4425 N MALDEN ST
805 06 1360 / 7546
4425 N MALDEN ST
302 00 0084 / 5769
4436 N MALDEN ST
805 06 1361 / 7547
4436 N MALDEN ST
302 00 0084 / 5769
4516 N MALDEN ST
805 06 1365 / 7551
4516 N MALDEN ST
302 00 0084 / 5769
4530 N MALDEN ST
805 06 1339 / 7525
4530 N MALDEN ST
302 00 0084 / 5769
4552 N MALDEN ST
805 06 1341 / 7527
4552 N MALDEN ST
302 00 0084 / 5769
4602 N MALDEN ST
805 06 1345 / 7531
4602 N MALDEN ST
302 00 0084 / 5769
4615 N MALDEN ST
805 06 1346 / 7532
4615 N MALDEN ST
302 00 0084 / 5769
4616 N MALDEN ST
805 06 1348 / 7534
4616 N MALDEN ST
302 00 0084 / 5769
4626 N MALDEN ST
805 06 1350 / 7536
4626 N MALDEN ST
302 00 0084 / 5769
4637 N MALDEN ST
805 06 1322 / 7508
4637 N MALDEN ST
302 00 0084 / 5769
4642 N MALDEN ST
805 06 1325 / 7511
4642 N MALDEN ST
302 00 0084 / 5769
4703 N MALDEN ST
Installations 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0 11/24/97
11/24/97
267
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/13/98
07/13/98
275
100
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 492
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 1326 / 7512
4703 N MALDEN ST
302 00 0084 / 5769
4721 N MALDEN ST
805 06 1332 / 7518
4721 N MALDEN ST
302 00 0084 / 5769
4736 N MALDEN ST
805 06 1308 / 7494
4736 N MALDEN ST
302 00 0084 / 5769
4741 N MALDEN ST
805 06 1312 / 7498
4741 N MALDEN ST
302 00 0084 / 5769
4752 N MALDEN ST
805 06 1316 / 7502
4752 N MALDEN ST
302 00 0084 / 5769
4755 N MALDEN ST
805 06 1320 / 7506
4755 N MALDEN ST
302 00 0084 / 5769
4401 N RACINE AVE
805 06 1357 / 7543
4401 N RACINE AVE
302 00 0084 / 5769
4007 N SHERIDAN RD
805 06 1384 / 7570
4007 N SHERIDAN RD
302 00 0084 / 5769
4013 N SHERIDAN RD
805 06 1386 / 7572
4013 N SHERIDAN RD
302 00 0084 / 5769
4024 N SHERIDAN RD
805 06 1388 / 7574
4024 N SHERIDAN RD
302 00 0084 / 5769
4046 N SHERIDAN RD
805 06 1391 / 7577
4046 N SHERIDAN RD
302 00 0084 / 5769
4056 N SHERIDAN RD
805 06 1394 / 7580
4056 N SHERIDAN RD
302 00 0084 / 5769
4072 N SHERIDAN RD
805 06 1367 / 7553
4072 N SHERIDAN RD
302 00 0084 / 5769
4106 N SHERIDAN RD
805 06 1368 / 7554
4106 N SHERIDAN RD
302 00 0084 / 5769
4445 N SHERIDAN RD
805 06 1362 / 7548
4445 N SHERIDAN RD
302 00 0084 / 5769
4500 N SHERIDAN RD
805 06 1364 / 7550
4500 N SHERIDAN RD
Installations 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
0 12/05/97
12/05/97
300
100
0 07/16/98
07/16/98
275
100
0 12/05/97
12/05/97
300
100
0 07/20/98
07/20/98
275
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
276
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
275
100
0 12/05/97
12/05/97
300
100
0 07/27/98
07/27/98
275
100
0 12/05/97
12/05/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 493
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0675 / 6861
4518 N SHERIDAN RD
302 00 0084 / 5769
4552 N SHERIDAN RD
805 06 1342 / 7528
4552 N SHERIDAN RD
1.0
12/05/97
805 06 0462 / 6648
4801 N WINTHROP AVE
1.0
805 06 0479 / 6665
4801 N WINTHROP AVE
1.0
302 00 0084 / 5769
4802 N WINTHROP AVE
805 06 1293 / 7479
4802 N WINTHROP AVE
302 00 0084 / 5769
4824 N WINTHROP AVE
805 06 1297 / 7483
4824 N WINTHROP AVE
302 00 0084 / 5769
4825 N WINTHROP AVE
805 06 1298 / 7484
4825 N WINTHROP AVE
302 00 0084 / 5769
1.0
0 06/01/95
06/01/95
300
100
0 07/27/98
07/27/98
275
100
12/05/97
0 12/05/97
12/05/97
300
100
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
0 08/17/98
08/17/98
275
100
0 12/05/97
12/05/97
300
100
0 08/17/98
08/17/98
275
100
0 12/05/97
12/05/97
300
100
0 08/17/98
08/17/98
275
100
0 12/05/97
12/05/97
300
100
4828 N WINTHROP AVE
0 08/17/98
08/17/98
275
100
302 00 0084 / 5769
4839 N WINTHROP AVE
0 08/17/98
08/17/98
275
100
805 06 1301 / 7487
4839 N WINTHROP AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1304 / 7490
4852 N WINTHROP AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4853 N WINTHROP AVE
0 08/17/98
08/17/98
275
100
302 00 0084 / 5769
4861 N WINTHROP AVE
0 08/17/98
08/17/98
275
100
805 06 1278 / 7464
4861 N WINTHROP AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
4875 N WINTHROP AVE
0 08/17/98
08/17/98
275
100
805 06 1280 / 7466
4875 N WINTHROP AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 0781 / 6967
830 W AGATITE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
302 00 0084 / 5769
935 W AGATITE AVE
0 08/25/98
08/25/98
276
100
805 06 1222 / 7408
935 W AGATITE AVE
0 12/05/97
12/05/97
300
100
302 00 0084 / 5769
945 W AGATITE AVE
0 08/25/98
08/25/98
276
100
805 06 1225 / 7411
945 W AGATITE AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 0861 / 7047
620 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0829 / 7015
622 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0874 / 7060
640 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0845 / 7031
660 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0820 / 7006
680 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0821 / 7007
720 W BITTERSWEET PL
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
1.0
1.0
1.0
1.0
1.0
06/01/95
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
06/01/95
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 494
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps 805 06 0822 / 7008
740 W BITTERSWEET PL
302 00 0083 / 5768
1249 W CARMEN AVE
805 06 1442 / 7628
1249 W CARMEN AVE
302 00 0083 / 5768
1309 W CARMEN AVE
805 06 1445 / 7631
1309 W CARMEN AVE
302 00 0083 / 5768
1333 W CARMEN AVE
805 06 1451 / 7637
1333 W CARMEN AVE
302 00 0084 / 5769
1345 W CARMEN AVE
805 06 1453 / 7639
1345 W CARMEN AVE
302 00 0084 / 5769
950 W CUYLER AVE
805 06 1226 / 7412
950 W CUYLER AVE
302 00 0084 / 5769
960 W CUYLER AVE
805 06 1227 / 7413
960 W CUYLER AVE
302 00 0084 / 5769
970 W CUYLER AVE
805 06 1230 / 7416
970 W CUYLER AVE
302 00 0084 / 5769
911 W EASTWOOD AVE
805 06 1221 / 7407
911 W EASTWOOD AVE
302 00 0084 / 5769
803 W LAKESIDE PL
805 06 1245 / 7431
803 W LAKESIDE PL
302 00 0084 / 5769
839 W LAKESIDE PL
805 06 1217 / 7403
839 W LAKESIDE PL
302 00 0084 / 5769
855 W LAKESIDE PL
805 06 1220 / 7406
855 W LAKESIDE PL
302 00 0084 / 5769
937 W LAKESIDE PL
805 06 1223 / 7409
937 W LAKESIDE PL
302 00 0084 / 5769
827 W LELAND AVE
805 06 1216 / 7402
827 W LELAND AVE
302 00 0084 / 5769
845 W LELAND AVE
805 06 1219 / 7405
845 W LELAND AVE
302 00 0084 / 5769
937 W LELAND AVE
805 06 1224 / 7410
937 W LELAND AVE
Installations 1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
06/01/95
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
06/01/95
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0 06/01/95
06/01/95
300
100
0 09/02/97
09/02/97
266
100
0 12/05/97
12/05/97
300
100
0 09/02/97
09/02/97
266
100
0 12/05/97
12/05/97
300
100
0 09/02/97
09/02/97
266
100
0 12/05/97
12/05/97
300
100
0 08/25/98
08/25/98
276
100
0 12/05/97
12/05/97
300
100
0 08/25/98
08/25/98
276
100
0 12/05/97
12/05/97
300
100
0 08/25/98
08/25/98
276
100
0 12/05/97
12/05/97
300
100
0 08/25/98
08/25/98
276
100
0 12/05/97
12/05/97
300
100
0 09/09/98
09/09/98
276
100
0 12/05/97
12/05/97
300
100
0 09/09/98
09/09/98
276
100
0 12/05/97
12/05/97
300
100
0 09/09/98
09/09/98
276
100
0 12/05/97
12/05/97
300
100
0 09/09/98
09/09/98
276
100
0 12/05/97
12/05/97
300
100
0 09/09/98
09/09/98
276
100
0 12/05/97
12/05/97
300
100
0 09/14/98
09/14/98
276
100
0 12/05/97
12/05/97
300
100
0 09/14/98
09/14/98
276
100
0 12/05/97
12/05/97
300
100
0 09/14/98
09/14/98
276
100
0 12/05/97
12/05/97
300
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 495
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
302 00 0084 / 5769
960 W LELAND AVE
0 09/14/98
09/14/98
276
100
805 06 1228 / 7414
960 W LELAND AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 0509 / 6695
732 W WAVELAND AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
302 00 0083 / 5768
1238 W WINONA ST
0 09/02/97
09/02/97
267
100
805 06 1441 / 7627
1238 W WINONA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1258 W WINONA ST
0 09/02/97
09/02/97
267
100
805 06 1444 / 7630
1258 W WINONA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1312 W WINONA ST
0 09/02/97
09/02/97
267
100
805 06 1448 / 7634
1312 W WINONA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1332 W WINONA ST
0 09/02/97
09/02/97
267
100
805 06 1450 / 7636
1332 W WINONA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1340 W WINONA ST
0 09/02/97
09/02/97
267
100
805 06 1452 / 7638
1340 W WINONA ST
0 12/05/97
12/05/97
300
100
302 00 0083 / 5768
1346 W WINONA ST
0 09/02/97
09/02/97
266
100
805 06 1454 / 7640
1346 W WINONA ST
0 12/05/97
12/05/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
4544 N BROADWAY
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4544 N BROADWAY
Work Type: Flood Light Install
1.0
1.0
1.0
1.0
1.0
1.0
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
724.0
15,019
95,015
Lamps 1,228.0
06/01/07
12/31/07
36,152 08/01/07
08/17/07
36,152
100
0 04/08/02
04/11/02
20,612
100
Installations 1,132.0
Fixtures
300 06 0167 / 5306
4700 N MAGNOLIA AVE
7.0
0 10/13/99
10/13/99
1,152
100
300 06 0167 / 5306
801 W SHERIDAN RD
1.0
0 08/16/99
08/16/99
351
100
8.0
0
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 300 06 0292 / 5399
4700 N MARINE DR
1,503
Installations .0
07/22/05
02/17/06
13,602 07/22/06
09/22/06
8,177
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 496
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Ornamental - Piggyback Lighting 300 05 0046 / 5161
ON N CLARENDON AVE FROM W WILSON AVE TO W WINDSOR AVE
300 06 0122 / 5275
ON N SHERIDAN RD FROM W BYRON ST TO W IRVING PARK RD
300 07 0046 / 5469
ON W WAVELAND AVE FROM N LAKE SHORE DR WEST TO N BROADWAY
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
4544 N BROADWAY
Work Type: Residntl Staggered Lighting
Fixtures 2.0
2.0
04/04/05
11/18/05
15,000 06/20/05
06/24/05
9,992
100
11/01/04
11/30/04
48,250 10/01/04
11/01/04
30,189
100
08/01/06
08/10/06
135,000 08/14/06
09/20/06
77,358
100
4.0
198,250
117,539
0
0
0
Lamps .0
03/01/08
12/01/08
Blocks
300 06 0308 / 5414
ON N CLARENDON AVE FROM W IRVING PARK RD TO W MONTROSE AVE
2.0
06/12/06
08/25/06
119,285 07/21/06
09/28/06
72,126
100
300 07 0046 / 5469
ON N FREMONT ST FROM W SHERIDAN RD TO W IRVING PARK RD
1.0
07/24/06
09/29/06
85,000 03/26/07
07/13/07
47,349
100
300 07 0046 / 5469
ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE
1.0
08/07/06
10/06/06
72,500 11/02/06
04/16/07
48,783
100
300 09 / 33112
ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE
4.0
300 11 / 32235
ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
2.0
04/01/08
06/02/08
72,500 10/29/07
300 11 / 32237
ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
2.0
04/01/08
06/02/08
300 11 / 32235
ON N RACINE AVE FROM W WILSON AVE TO W LELAND AVE
1.0
12/07/07
03/14/08
300 05 0046 / 5161
ON W BRADLEY PL FROM N HALSTED ST TO N FREMONT ST
1.0
09/25/05
300 05 0046 / 5161
ON W BROMPTON AVE FROM N BROADWAY TO N HALSTED ST
1.0
300 11 / 32233
ON W CORNELIA AVE FROM N BROADWAY TO N HALSTED ST
300 07 0046 / 5469
20,000
0
0
04/18/08
59,547
100
55,000 10/29/07
04/18/08
45,000
100
45,000 12/07/07
04/25/08
34,455
100
11/18/05
85,000 10/12/05
12/09/05
39,287
100
10/15/05
11/18/05
85,000 10/12/05
12/09/05
39,287
100
.50
06/27/07
08/03/07
18,750 06/25/07
10/10/07
10,885
100
ON W DAKIN ST FROM N BROADWAY TO N SHERIDAN RD
2.0
07/24/06
09/29/06
150,000 03/26/07
07/13/07
95,643
100
300 06 0298 / 5405
ON W GRACE ST FROM N HALSTED ST TO N LAKE SHORE DR WEST
2.0
06/01/05
07/01/05
0 06/20/05
08/05/05
80,715
100
300 07 0046 / 5469
ON W SHERIDAN RD FROM N FREMONT ST TO N LAKE SHORE DR WEST
3.0
07/24/06
09/26/06
165,000 03/26/07
07/13/07
95,436
100
300 11 / 32233
ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE
.33
07/09/07
09/07/07
14,850 07/09/07
11/02/07
9,058
100
300 11 / 32235
ON W SHERIDAN RD FROM N FREMONT ST TO N SHEFFIELD AVE
.50
07/09/07
09/07/07
22,500 07/09/07
11/02/07
13,725
100
300 06 / 32146
ON W SUNNYSIDE AVE FROM N SHERIDAN RD TO N CLARENDON AVE
.0
10/05/07
03/31/08
300 11 / 32233
ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST
.50
07/09/07
09/07/07
300 11 / 32235
ON W WAVELAND AVE FROM N HALSTED ST TO N FREMONT ST
.50
07/09/07
09/07/07
300 06 / 32146
ON W WINDSOR AVE FROM N SHERIDAN RD TO N CLARENDON AVE
2.0
11/05/07
04/29/08
300 07 0046 / 5469
ON W WINNEMAC AVE FROM N CLARK ST TO N ASHLAND AVE
1.0
08/14/06
09/15/06
50,000 11/10/06
300 07 0046 / 5469
ON W WINONA ST FROM N BROADWAY TO N GLENWOOD AVE
2.0
08/07/06
10/06/06
140,000 11/10/06
Totals per Residntl Staggered Lighting
29.33
328,000
0
99
22,500 07/09/07
11/02/07
13,725
100
21,250 07/09/07
11/02/07
13,725
100
328,000
1,900,135
0
98
04/16/07
18,365
100
04/16/07
97,625
100
834,734
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 497
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Blocks
Work Type: Residntl Strt Lighting/Lamps 300 06 0267 / 5375
ON N HAZEL ST FROM W BUENA AVE TO W MONTROSE AVE
2.0
07/01/04
08/15/04
160,902 07/06/04
11/12/04
131,497
100
300 06 0069 / 5233
ON N JANSSEN AVE FROM W ARGYLE ST TO W AINSLIE ST
1.0
10/15/03
01/15/04
40,000 10/14/03
12/05/03
38,748
100
300 03 0046 / 4917
ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD
4.0
12/15/04
03/01/05
251,000 12/06/04
05/27/05
193,741
100
300 06 0069 / 5233
ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE
2.96
10/15/03
01/15/04
162,800 10/14/03
12/05/03
120,013
100
300 06 0276 / 5384
ON W BELLE PLAINE AVE FROM N CLARENDON AVE TO N BROADWAY
11/15/04
12/15/04
60,000 12/06/04
03/15/05
53,453
100
302 00 0092 / 5774
ON W BITTERSWEET PL FROM N CLARENDON AVE TO N MARINE DR
2.0
01/10/03
03/10/03
129,000 01/17/03
03/13/03
125,221
100
300 03 0046 / 4917
ON W BUENA AVE FROM N CLARENDON AVE TO N HAZEL ST
1.0
07/06/04
09/06/04
80,000 07/06/04
11/05/04
68,072
100
302 00 0092 / 5774
ON W BUENA AVE FROM N CLARENDON AVE TO N MARINE DR
2.0
12/04/02
02/15/03
90,000 12/04/02
02/11/03
84,108
100
300 06 0069 / 5233
ON W BUENA AVE FROM N SHERIDAN RD TO N BROADWAY
1.0
11/01/03
12/01/03
50,000 10/21/03
01/20/04
28,162
100
300 03 0046 / 4917
ON W CORNELIA AVE FROM N BROADWAY TO N LAKE SHORE DR
1.0
10/15/04
12/15/04
110,000 10/22/04
12/23/04
85,812
100
300 06 0069 / 5233
ON W CULLOM AVE FROM N BROADWAY TO N HAZEL ST
1.0
11/15/03
12/15/03
63,000 10/21/03
01/20/04
77,152
100
300 03 0046 / 4917
ON W CUYLER AVE FROM N BROADWAY TO N SHERIDAN RD
1.0
11/01/04
12/15/04
100,000 12/15/04
03/01/05
85,372
100
302 00 0092 / 5774
ON W EASTWOOD AVE FROM N CLARENDON AVE TO N SHERIDAN RD
2.0
03/01/03
05/01/03
105,000 04/01/03
06/15/03
135,719
100
300 06 0235 / 5349
ON W GORDON TER FROM N MARINE DR TO N CLARENDON AVE
1.0
06/15/03
08/15/03
76,427 06/16/03
08/14/03
65,281
100
300 03 0046 / 4917
ON W HUTCHINSON AVE FROM N MARINE DR TO N HAZEL ST
2.0
07/06/04
09/06/04
150,000 07/06/04
11/05/04
114,363
100
300 03 0046 / 4917
ON W JUNIOR TER FROM N CLARENDON AVE TO N HAZEL ST
1.0
07/06/04
09/06/04
75,000 07/06/04
11/05/04
53,740
100
300 06 0235 / 5349
ON W JUNIOR TER FROM N MARINE DR TO N CLARENDON AVE
1.0
06/15/03
08/15/03
76,427 06/16/03
08/14/03
65,281
100
300 06 0069 / 5233
ON W LAKESIDE PL FROM N SHERIDAN RD TO N CLARENDON AVE
2.0
07/27/03
10/15/03
134,000 07/27/03
11/07/03
108,601
100
302 00 0092 / 5774
ON W LELAND AVE FROM N CLARENDON AVE TO N SHERIDAN RD
2.0
02/15/03
04/15/03
118,500 02/14/03
05/21/03
109,284
100
300 06 0069 / 5233
ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY
1.0
10/15/04
12/15/04
27,500 12/01/04
12/23/04
36,344
100
300 06 0276 / 5384
ON W STRATFORD PL FROM N LAKE SHORE DR WEST TO N BROADWAY
10/15/04
12/15/04
27,500 10/22/04
12/23/04
36,344
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Residntl Strt Lighting/Lamps 300 06 0122 / 5275
ON N PINE GROVE AVE FROM W CORNELIA AVE TO W IRVING PARK RD
30.96
2,087,056
1,816,307
Locations 12/01/04
01/31/05
124,000 12/06/04
05/20/05
124,000
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 498
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
1020 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1023 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1241 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1434 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
4.0
0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting
1,512
Locations
302 00 0076 / 5764
ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE
11.0
05/05/98
05/21/98
0 05/05/98
05/21/98
187
100
300 06 0058 / 5229
ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE
50.49
09/20/02
10/20/02
11,550 09/20/02
10/30/02
11,550
100
300 06 0108 / 5263
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
11.34
03/01/04
03/10/04
3,346 04/12/04
05/07/04
2,773
100
Totals per Strt Light Pole Painting
72.83
14,896
14,510
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 499
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting
Blocks
302 00 0091 / 5773
ON N BEACON ST FROM W LAWRENCE AVE TO W WILSON AVE
78,249 08/20/01
01/29/02
74,660
100
302 00 0088 / 5770
ON N HAZEL ST FROM W MONTROSE AVE TO W WILSON AVE
0 06/23/97
02/25/98
67,521
100
302 00 0089 / 5771
ON N KENMORE AVE FROM W IRVING PARK RD TO W MONTROSE AVE
0 09/11/98
09/28/99
250,573
100
302 00 0091 / 5773
ON N MAGNOLIA AVE FROM W LAWRENCE AVE TO W WILSON AVE
2.0
10/01/01
12/30/01
77,590 10/12/01
01/14/02
73,083
100
302 00 0091 / 5773
ON N MALDEN ST FROM W LAWRENCE AVE TO W WILSON AVE
2.0
10/01/01
12/30/01
76,368 08/27/01
01/29/02
71,495
100
302 00 0089 / 5771
ON N PINE GROVE AVE FROM W ADDISON ST TO W SHERIDAN RD
0
40,000
100
302 00 0088 / 5770
ON W AGATITE AVE FROM N CLARENDON AVE TO N SHERIDAN RD
0
67,521
100
302 00 0089 / 5771
ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE
0 04/16/99
06/24/99
0
100
302 00 0088 / 5770
ON W ARGYLE ST FROM N GLENWOOD AVE TO N CLARK ST
0 06/03/98
06/18/98
67,521
100
302 00 0091 / 5773
ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE
.50
491 02/13/01
02/13/01
193
100
302 00 0091 / 5773
ON W CARMEN AVE FROM N BROADWAY TO N GLENWOOD AVE
3.0
11/02/00
03/15/01
72,300 11/08/00
02/27/01
97,891
100
302 00 0091 / 5773
ON W CARMEN AVE FROM N GLENWOOD AVE TO N CLARK ST
1.0
11/01/00
12/04/00
60,700 11/01/00
12/04/00
77,631
100
302 00 0088 / 5770
ON W LELAND AVE FROM N RACINE AVE TO N BEACON ST
0 12/30/97
09/30/98
67,521
100
302 00 0088 / 5770
ON W SUNNYSIDE AVE FROM N CLARENDON AVE TO N SHERIDAN RD
0
67,522
100
302 00 0088 / 5770
ON W WINDSOR AVE FROM N CLARENDON AVE TO N SHERIDAN RD
0
67,522
100
302 00 0088 / 5770
ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE
0 01/07/98
06/08/98
33,761
100
302 00 0091 / 5773
ON W WINNEMAC AVE FROM N CLARK ST TO N GLENWOOD AVE
57,700 09/17/01
02/07/02
61,166
100
302 00 0088 / 5770
ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST
0 04/07/98
06/03/98
33,761
100
302 00 0091 / 5773
4400-4500 N BEACON ST
2.0
100,000 06/28/01
12/10/01
119,477
100
302 00 0091 / 5773
4400 N CLIFTON AVE
1.0
45,000 05/22/01
08/14/01
69,934
100
302 00 0090 / 5772
4600 N CLIFTON AVE
78,895 11/15/99
02/15/00
60,000
100
302 00 0089 / 5771
3900-3931 N FREMONT ST
0 10/01/98
09/27/99
99,386
100
302 00 0091 / 5773
4800 N KENMORE AVE
1.0
80,000 07/23/01
02/07/02
82,981
100
302 00 0091 / 5773
4400-4500 N MAGNOLIA AVE
2.0
100,000 05/03/01
09/11/01
60,217
100
302 00 0091 / 5773
4400-4500 N MALDEN ST
2.0
100,000 05/10/01
01/29/02
59,819
100
302 00 0091 / 5773
4400 N RACINE AVE
1.0
50,000 04/03/01
08/14/01
45,801
100
302 00 0089 / 5771
4800-4899 N WINTHROP AVE
0 04/23/99
06/17/99
0
100
302 00 0091 / 5773
900 W BELLE PLAINE AVE
1.0
42,000 06/14/01
09/11/01
60,848
100
302 00 0091 / 5773
900 W GORDON TER
1.0
42,000 06/26/01
09/11/01
39,393
100
302 00 0091 / 5773
1200 W SUNNYSIDE AVE
1.0
25,000 05/22/01
08/14/01
2,599
100
Totals per Strt Lighting
2.0
1.0
09/01/01
10/01/01
11/01/99
23.50
04/03/01
11/01/01
12/30/01
12/30/01
02/15/00
12/03/01
12/30/01
1,086,293
1,919,797
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 500
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
4544 N BROADWAY
Work Type: Underpass Lighting
Lamps 1,500.0
03/01/04
12/01/04
7,800 11/02/06
11/28/06
16,335
100
Fixtures
300 06 0217 / 5337
4544 N BROADWAY
160.0
07/08/04
07/14/04
8,993 06/25/04
06/29/04
6,856
100
805 06 2297 / 8483
4698 N BROADWAY
20.0
10/02/96
10/02/96
0 10/02/96
10/02/96
15,000
100
805 06 2740 / 8926
555 W IRVING PARK DR
31.0
11/01/94
11/01/94
0 11/01/94
11/01/94
23,250
100
805 06 2674 / 8860
1195 W LELAND AVE
19.0
12/14/94
12/14/94
0 12/14/94
12/14/94
14,250
100
805 06 2687 / 8873
1199 W LELAND AVE
21.0
07/01/94
07/01/94
0 07/01/94
07/01/94
15,750
100
805 06 2395 / 8581
1039 W MONTROSE AVE
4.0
07/19/95
07/19/95
0 07/19/95
07/19/95
3,000
100
805 06 2737 / 8923
620 W MONTROSE DR
27.0
12/14/94
12/14/94
0 12/14/94
12/14/94
20,250
100
805 06 2182 / 8368
1129 W WILSON AVE
6.0
12/31/95
12/31/95
0 12/31/95
12/31/95
4,500
100
Totals per Underpass Lighting
288.0
8,993
102,856
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 501
1/1/2008 AND 12/31/2008
Ward 46 Helen Shiller CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Left Turn Arrow 210 06 0023 / 4298
N BROADWAY AND W MONTROSE AVE
Work Type: New Signal 210 06 0171 / 4420
N HALSTED ST AND W WAVELAND AVE
Work Type: Pedestrian Countdown Signal Install 300 11 / 32235
W GRACE ST AND N HALSTED ST
300 06 0166 / 5305
wo#10720180 Note Last Updated on 07-MAR-08 4900 N GLENWOOD AVE
Totals per Pedestrian Countdown Signal Install
Work Type: Signals 300 06 0096 / 5258
4544 N BROADWAY
Work Type: TSM Install
Locations 1.0
07/01/06
09/30/06
55,000
0
08/01/06
04/01/07
108,000 04/25/07
05/24/07
53,026
100
12.0
12/05/07
12/09/07
18,000 12/07/07
12/11/07
0
100
1.0
07/11/00
07/11/00
8,000 07/11/00
07/11/00
7,224
100
Locations .50
Locations
13.0
26,000
7,224
Intersections 38.0
11/20/03
11/25/03
0 09/20/06
09/26/06
6,009
100
Locations
210 06 0020 / 4295
N BROADWAY AND W CORNELIA AVE
02/01/01
03/15/01
67,500 02/14/01
04/20/01
38,582
100
210 06 0020 / 4295
W FOSTER AVE AND N GLENWOOD AVE
01/15/01
03/15/01
65,450 12/09/99
02/11/00
50,081
100
210 06 0019 / 4294
W MONTROSE AVE AND N HAZEL ST
1.0
05/16/00
06/30/00
150,000 07/09/98
04/06/00
92,244
100
814 06 0372 / 16562
4700 N BROADWAY
1.0
03/08/96
03/08/96
0 03/08/96
03/08/96
159,145
100
271 00 0045 / 4794
4400 N MARINE DR
1.0
0 08/01/97
08/15/99
201,000
814 06 0140 / 16354
4000 N SHERIDAN RD
0 07/06/93
07/06/93
111,966
1.0 4.0
07/06/93
07/06/93
282,950
653,018
471,950
719,277
Totals per Construction Phase
5,967,674
5,830,887
Totals for Ward 46
5,983,474
5,845,101
Totals per TSM Install Totals per Traffic
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 502
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD
.0
02/01/06
07/31/06
0 02/01/06
09/28/06
27
100
300 06 / 32275
ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE
.0
03/01/07
10/31/07
3,900 03/06/07
04/03/07
2,365
100
300 05 0047 / 5162
ON N BELL AVE FROM W LAWRENCE AVE TO W ARGYLE ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N CAMPBELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 / 32277
ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST
.0
04/01/08
08/30/08
0
0
0
300 05 0047 / 5162
ON N GREENVIEW AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N HERMITAGE AVE FROM W GRACE ST TO W IRVING PARK RD
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N HERMITAGE AVE FROM W IRVING PARK RD TO W BERTEAU AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N HERMITAGE AVE FROM W MONTROSE AVE TO W SUNNYSIDE AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N HOYNE AVE FROM W GRACE ST TO W BYRON ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N HOYNE AVE FROM W LAWRENCE AVE TO W ARGYLE ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 0308 / 5414
ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD
.0
02/01/06
07/31/06
0 02/01/06
07/31/06
27
100
300 06 / 32275
ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE
.0
03/01/07
10/31/07
3,900 02/02/07
03/15/07
2,365
100
300 05 0047 / 5162
ON N LINCOLN AVE FROM W LELAND AVE TO W LAWRENCE AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N MAPLEWOOD AVE FROM W MONTROSE AVE TO W WILSON AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 / 32277
ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST
.0
04/01/08
08/30/08
0
0
0
300 05 0047 / 5162
ON N OAKLEY AVE FROM W LAWRENCE AVE TO W AINSLIE ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N ROCKWELL ST FROM W LAWRENCE AVE TO W GUNNISON ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N SEELEY AVE FROM W CORNELIA AVE TO W ADDISON ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON N WOLCOTT AVE FROM W BERTEAU AVE TO W CULLOM AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 / 32277
ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE
.0
04/01/08
08/30/08
0
0
0
300 05 0047 / 5162
ON W ARGYLE ST FROM N DAMEN AVE TO N LEAVITT ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W ARGYLE ST FROM N LINCOLN AVE TO N ROCKWELL ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 06 / 32277
ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE
.0
04/01/08
08/30/08
0
0
0
300 05 0047 / 5162
ON W BELLE PLAINE AVE FROM N DAMEN AVE TO N LINCOLN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W BERTEAU AVE FROM N LINCOLN AVE TO N LEAVITT ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W BRADLEY PL FROM N WOLCOTT AVE TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W BYRON ST FROM N CLAREMONT AVE TO N WESTERN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W CARMEN AVE FROM N LEAVITT ST TO N OAKLEY AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W CORNELIA AVE FROM N DAMEN AVE TO N LEAVITT ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W CULLOM AVE FROM N DAMEN AVE TO N LINCOLN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 503
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 05 0047 / 5162
ON W CUYLER AVE FROM N WOLCOTT AVE TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W EASTWOOD AVE FROM N CAMPBELL AVE TO N ROCKWELL ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W EASTWOOD AVE FROM N ROCKWELL ST TO N VIRGINIA AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W EASTWOOD AVE FROM N SEELEY AVE TO N HAMILTON AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W GRACE ST FROM N RAVENSWOOD TO N LINCOLN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W LELAND AVE FROM N WESTERN AVE TO N WASHTENAW AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W PENSACOLA AVE FROM N DAMEN AVE TO N HOYNE AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WARNER AVE FROM N LINCOLN AVE TO N LEAVITT ST
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WARNER AVE FROM N WESTERN AVE TO N CAMPBELL AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WAVELAND AVE FROM N LINCOLN AVE TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WAVELAND AVE FROM N WOLCOTT AVE TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WILSON AVE FROM N WESTERN AVE TO N VIRGINIA AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WINNEMAC AVE FROM N RAVENSWOOD TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WINNEMAC AVE FROM N WESTERN AVE TO N LINCOLN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WINNEMAC AVE FROM N WINCHESTER AVE TO N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
ON W WINONA ST FROM N LEAVITT ST TO N OAKLEY AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
210 06 0243 / 4480
N DAMEN AVE AND W LAWRENCE AVE
.0
12/26/06
01/26/07
500 12/26/06
01/26/07
1,275
100
300 05 0047 / 5162
N GREENVIEW AVE AND W LELAND AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
210 06 0205 / 4448
W ADDISON ST AND N WOLCOTT AVE
.0
07/01/04
12/01/04
0 07/01/04
12/01/04
2,531
100
300 06 0292 / 5399
4700 N CLARK ST
4,000 04/12/05
05/12/05
0
100
300 05 0047 / 5162
4632 N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
4700 N DAMEN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
210 06 0106 / 4366
4800 N OAKLEY AVE
.0
07/27/00
10/17/00
0 07/27/00
10/17/00
1,817
100
300 05 0047 / 5162
3800 N WESTERN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
4132 N WESTERN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
4700 N WESTERN AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
300 05 0047 / 5162
4800 N WOLCOTT AVE
.0
07/17/06
07/30/06
0 07/17/06
07/30/06
0
0
Totals per Design/Engineering
1.0
1.0
12,300
10,407
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 504
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout 300 06 0307 / 5413
ON N WOLCOTT AVE FROM W WINONA ST TO W BRYN MAWR AVE
Work Type: 400 Watt Changeout
Fixtures 8.50
02/21/06
05/31/06
3,400 01/16/05
02/10/06
2,113
100
Fixtures
300 03 0047 / 4918
ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE
42.0
11/01/04
11/20/04
16,800 10/01/04
10/15/04
16,114
100
300 03 0047 / 4918
ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE
18.0
11/01/04
11/20/04
7,200 10/01/04
10/15/04
7,092
100
300 03 0047 / 4918
ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE
5.0
11/01/04
11/20/04
2,000 10/01/04
10/15/04
2,087
100
300 03 0040 / 4911
ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE
12.25
08/20/04
09/20/04
4,900 07/14/04
08/10/04
3,202
100
300 03 0047 / 4918
ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE
9.0
11/01/04
11/20/04
1,200 10/01/04
10/15/04
2,417
100
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
26.40
08/20/04
09/20/04
10,560 07/14/04
08/10/04
6,901
100
300 03 0047 / 4918
ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE
18.0
11/01/04
11/20/04
7,200 10/01/04
10/15/04
5,167
100
300 03 0040 / 4911
ON W LAWRENCE AVE FROM N CALIFORNIA AVE TO N ROCKWELL AVE
5.92
08/20/04
09/20/04
2,368 07/14/04
08/10/04
1,547
100
300 03 0047 / 4918
ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE
40.0
11/01/04
11/20/04
16,000 10/01/04
10/15/04
16,276
100
300 09 / 33113
4832-4900 N LINCOLN AVE
2.0
02/01/08
12/31/08
800 08/28/08
08/29/08
0
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
178.57
69,028
60,803
1,308,235
1,335,264
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 505
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0739 / 6925
4520 N ARTESIAN AVE
1.0
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
805 06 0740 / 6926
4532 N ARTESIAN AVE
1.0
11/27/96
11/27/96
0 11/27/96
11/27/96
300
100
805 06 0726 / 6912
4551 N ARTESIAN AVE
1.0
09/30/96
09/30/96
0 09/30/96
09/30/96
300
100
805 06 1799 / 7985
3949 N ASHLAND AVE
1.0
04/11/97
04/11/97
0 04/11/97
04/11/97
300
100
302 00 0083 / 5768
4814 N ASHLAND AVE
0 12/04/97
12/04/97
266
100
302 00 0083 / 5768
5054 N ASHLAND AVE
0 12/04/97
12/04/97
266
100
805 06 1290 / 7476
5054 N ASHLAND AVE
1.0
12/05/97
12/05/97
0 12/05/97
12/05/97
300
100
805 06 1591 / 7777
4617 N CLARK ST
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
300 06 0139 / 5289
4237 N LINCOLN AVE
1,208.0
03/01/06
09/01/06
31,905 05/20/06
06/01/06
36,498
100
302 00 0092 / 5774
4237 N LINCOLN AVE
14.0
0 01/16/01
12/12/01
3,299
100
805 06 0596 / 6782
5136 N OAKLEY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0588 / 6774
5142 N OAKLEY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0544 / 6730
3900 N PAULINA ST
1.0
01/17/96
01/17/96
0 01/17/96
01/17/96
300
100
805 06 0545 / 6731
4140 N PAULINA ST
1.0
08/16/96
08/16/96
0 08/16/96
08/16/96
300
100
805 06 0655 / 6841
3946 N SOUTHPORT AVE
1.0
12/05/96
12/05/96
0 12/05/96
12/05/96
300
100
805 06 0465 / 6651
4515 N WOLCOTT AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1731 / 7917
1923 W GRACE ST
1.0
05/30/97
05/30/97
0 05/30/97
05/30/97
300
100
805 06 1193 / 7379
2140 W IRVING PARK RD
1.0
01/30/97
01/30/97
0 01/30/97
01/30/97
300
100
805 06 0329 / 6515
2200 W LAWRENCE AVE
1.0
11/15/96
11/15/96
0 11/15/96
11/15/96
300
100
805 06 0330 / 6516
2204 W LAWRENCE AVE
1.0
11/06/96
11/06/96
0 11/06/96
11/06/96
300
100
805 06 0331 / 6517
1761 W LELAND AVE
1.0
11/27/96
11/27/96
0 11/27/96
11/27/96
300
100
805 06 1954 / 8140
2213 W MONTROSE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0456 / 6642
2219 W WILSON AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
4237 N LINCOLN AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
4237 N LINCOLN AVE
1,241.0
31,905
46,029
Lamps 1,496.0
06/01/07
12/31/07
44,042 07/31/07
08/17/07
44,042
100
0 04/16/02
04/19/02
25,510
100
Installations 1,401.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 506
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 09 / 33113
4500 N LINCOLN AVE
1.0
09/08/08
09/10/08
500 09/08/08
09/10/08
500
100
300 11 / 32236
4740 N WESTERN AVE
2.0
10/01/07
10/01/07
1,000 10/01/07
10/01/07
941
100
302 00 0092 / 5774
1332 W IRVING PARK RD
1.0
0 03/26/01
03/26/01
471
100
302 00 0092 / 5774
1822 W LARCHMONT AVE
1.0
0 06/29/01
06/29/01
471
100
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting
5.0
1,500
2,383
Fixtures
300 03 0047 / 4918
ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE
33.0
11/01/04
11/20/04
44,550 11/01/04
11/20/04
35,004
100
300 03 0047 / 4918
ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE
14.0
11/01/04
11/20/04
18,900 11/01/04
11/20/04
14,673
100
300 11 / 32222
ON W ADDISON ST FROM N LAWNDALE AVE TO N ROCKWELL ST
11.55
11/01/07
12/01/07
15,725 03/13/08
04/04/08
13,060
100
300 03 0047 / 4918
ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE
3.0
11/01/04
11/20/04
4,050 11/01/04
11/20/04
3,307
100
300 03 0047 / 4918
ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE
34.0
11/01/04
11/20/04
45,900 11/01/04
11/20/04
37,296
100
300 09 / 33113
4832-4900 N LINCOLN AVE
2.0
02/01/08
12/31/08
2,700 08/28/08
08/29/08
0
100
Totals per Ornamental - Piggyback Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
4237 N LINCOLN AVE
97.55
131,825
103,340
0
0
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 507
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 05 0047 / 5162
ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD
.0
08/01/06
09/15/06
25,000 08/01/06
09/15/06
0
100
300 06 0308 / 5414
ON N BELL AVE FROM W BYRON ST TO W IRVING PARK RD
1.0
03/16/06
09/28/06
90,005 07/31/06
09/28/06
59,380
100
300 06 / 32275
ON N BELL AVE FROM W IRVING PARK RD TO W BELLE PLAINE AVE
1.0
04/01/07
12/31/07
104,140 03/27/07
08/03/07
60,317
100
300 06 / 32277
ON N CLAREMONT AVE FROM W AINSLIE ST TO W ARGYLE ST
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON N CLAREMONT AVE FROM W WILSON AVE TO W SUNNYSIDE AVE
1.0
05/10/05
06/25/05
0 05/02/05
06/06/05
300 05 0047 / 5162
ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD
.0
08/01/06
09/15/06
25,000 08/01/06
300 06 0308 / 5414
ON N LEAVITT ST FROM W BYRON ST TO W IRVING PARK RD
1.0
09/01/06
09/28/06
90,005 07/31/06
300 06 / 32275
ON N LEAVITT ST FROM W IRVING PARK RD TO W BELLE PLAINE AVE
1.0
04/01/07
12/31/07
104,140 03/28/07
300 06 / 32277
ON N OAKLEY AVE FROM W AINSLIE ST TO W ARGYLE ST
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON N OAKLEY AVE FROM W WILSON AVE TO W SUNNYSIDE AVE
1.0
05/10/05
06/20/05
0 05/02/05
300 06 / 32277
ON W AINSLIE ST FROM N OAKLEY AVE TO N WESTERN AVE
.0
05/04/08
12/31/08
300 06 / 32277
ON W ARGYLE ST FROM N OAKLEY AVE TO N WESTERN AVE
.0
05/04/08
12/31/08
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps
6.0
0
0
66,931
100
09/15/06
0
100
09/28/06
59,380
100
08/03/07
60,317
100
0
0
66,931
100
0
0
0
0
0
0
438,290
373,256
06/06/05
Blocks
300 06 0267 / 5375
ON N LEAVITT ST FROM W ARGYLE ST TO W FOSTER AVE
2.0
05/26/04
07/26/04
159,200 05/06/04
07/14/04
153,257
100
300 06 0235 / 5349
ON N WASHTENAW AVE FROM W LELAND AVE TO W GIDDINGS ST
1.0
05/10/03
07/10/03
67,031 05/08/03
07/03/03
62,697
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl
3.0
226,231
215,954
Locations
302 00 0092 / 5774
1510 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1522 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1532 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1534 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
302 00 0092 / 5774
1546 W LELAND AVE
1.0
0 01/23/01
01/23/01
378
100
5.0
0
Totals per Short Arm Installs - Residntl
1,890
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 508
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Painting
Locations
300 03 0047 / 4918
ON N DAMEN AVE FROM W LELAND AVE TO W FOSTER AVE
46.0
11/01/04
11/20/04
13,550 10/01/04
10/20/04
10,630
100
300 03 0047 / 4918
ON N LINCOLN AVE FROM W AINSLIE ST TO W WINNEMAC AVE
20.0
11/01/04
11/20/04
5,750 10/01/04
10/20/04
5,335
100
300 03 0047 / 4918
ON N WESTERN AVE FROM W FOSTER AVE TO W WINNEMAC AVE
5.50
11/01/04
11/20/04
1,750 10/01/04
10/20/04
1,298
100
300 03 0040 / 4911
ON N WESTERN AVE FROM W WINNEMAC AVE TO W GLENLAKE AVE
11.34
05/10/04
09/10/04
3,112 05/10/04
08/01/04
3,062
100
300 03 0047 / 4918
ON W AINSLIE ST FROM N WESTERN AVE TO N LINCOLN AVE
3.0
11/01/04
11/20/04
600 10/01/04
10/20/04
649
100
300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
4.95
05/15/07
06/01/07
1,089 05/15/07
06/01/07
1,089
100
300 03 0040 / 4911
ON W FOSTER AVE FROM N ASHLAND AVE TO N KEDZIE AVE
25.68
05/10/04
09/10/04
7,728 05/10/04
08/01/04
6,934
100
300 03 0047 / 4918
ON W FOSTER AVE FROM N ASHLAND AVE TO N WESTERN AVE
21.50
11/01/04
11/20/04
6,500 10/01/04
10/20/04
5,101
100
300 04 0216 / 5114
ON W IRVING PARK RD FROM N DAMEN AVE TO N BELL AVE
27.0
05/01/06
11/01/06
5,768 05/17/06
08/15/06
5,768
100
300 04 0216 / 5114
ON W IRVING PARK RD FROM N ROCKWELL ST TO N CALIFORNIA AVE
12.0
05/01/06
11/01/06
2,596 05/17/06
07/25/06
2,596
100
300 03 0040 / 4911
ON W LAWRENCE AVE FROM N ROCKWELL AVE TO N CALIFORNIA AVE
6.29
05/10/04
09/10/04
1,924 05/10/04
08/01/04
1,698
100
300 03 0047 / 4918
ON W WILSON AVE FROM N DOVER ST TO N DAMEN AVE
60.0
11/01/04
11/20/04
17,900 10/01/04
10/20/04
14,042
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
243.26
68,266
58,201
Blocks
300 06 0247 / 5357
ON N CLAREMONT AVE FROM W HUTCHINSON ST TO W CULLOM AVE
.50
08/01/03
09/15/03
40,000 08/01/03
09/27/03
34,739
100
300 06 0247 / 5357
ON W BELLE PLAINE AVE FROM N CLARK ST TO N SOUTHPORT AVE
1.0
12/15/03
12/31/03
34,000 12/17/03
02/06/04
33,353
100
300 06 0247 / 5357
ON W HUTCHINSON ST FROM N CLAREMONT AVE TO N OAKLEY AVE
2.0
08/01/03
09/15/03
40,000 08/01/03
09/27/03
34,738
100
300 06 0076 / 5239
4643 N DAMEN AVE
06/01/00
09/15/00
58,500 02/24/99
12/30/99
66,504
100
300 06 0076 / 5239
4643 N ROCKWELL ST
06/01/00
09/15/00
58,500 02/24/99
12/30/99
66,504
100
300 06 0078 / 5241
4635 N SEELEY AVE
1.0
04/01/98
12/01/98
6,900 04/15/98
09/15/99
4,339
100
302 00 0091 / 5773
1400 W SUNNYSIDE AVE
1.0
35,000 06/25/01
10/05/01
45,581
100
5.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
4237 N LINCOLN AVE
272,900
285,758
Lamps 3,058.0
03/01/04
12/01/04
15,902 11/13/06
11/29/06
33,302
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 509
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0217 / 5337
4237 N LINCOLN AVE
88.0
07/15/04
07/20/04
4,946 06/29/04
07/02/04
6,722
100
805 06 2202 / 8388
1790 W ADDISON ST
6.0
02/14/97
02/14/97
0 02/14/97
02/14/97
4,500
100
805 06 2881 / 9067
1799 W ADDISON ST
11.0
09/25/93
09/25/93
0 09/25/93
09/25/93
8,250
100
302 00 0070 / 5758
1820 W ADDISON ST
0 02/07/97
02/14/97
6,212
100
805 06 2887 / 9073
1785 W BERTEAU AVE
6.0
12/06/93
12/06/93
0 12/06/93
12/06/93
4,500
100
805 06 2883 / 9069
1795 W GRACE ST
6.0
12/03/93
12/03/93
0 12/03/93
12/03/93
4,500
100
805 06 2885 / 9071
1785 W IRVING PARK RD
10.0
12/09/93
12/09/93
0 12/09/93
12/09/93
7,500
100
805 06 2204 / 8390
1790 W IRVING PARK RD
8.0
12/31/95
12/31/95
0 12/31/95
12/31/95
6,000
100
805 06 2866 / 9052
1785 W LAWRENCE AVE
8.0
12/02/93
12/02/93
0 12/02/93
12/02/93
6,000
100
805 06 2865 / 9051
1785 W LELAND AVE
8.0
12/10/93
12/10/93
0 12/10/93
12/10/93
6,000
100
805 06 2888 / 9074
1805 W MONTROSE AVE
8.0
12/08/93
12/08/93
0 12/08/93
12/08/93
6,000
100
805 06 2863 / 9049
1785 W SUNNYSIDE AVE
8.0
12/07/93
12/07/93
0 12/07/93
12/07/93
6,000
100
805 06 2864 / 9050
1785 W WILSON AVE
8.0
12/01/93
12/01/93
0 12/01/93
12/01/93
6,000
100
805 06 2914 / 9100
1785 W WINNEMAC AVE
6.0
12/13/93
12/13/93
0 12/13/93
12/13/93
4,500
100
Totals per Underpass Lighting
181.0
4,946
82,684
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 510
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0219 / 4459
N WESTERN AVE AND W ADDISON ST
1.0
10,563 04/05/05
04/05/05
10,084
100
210 06 0130 / 4389
N WESTERN AVE AND W AINSLIE ST
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0130 / 4389
N WESTERN AVE AND W BERTEAU AVE
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0130 / 4389
N WESTERN AVE AND W FOSTER AVE
.50
0 05/14/02
05/14/02
925
100
210 06 0219 / 4459
N WESTERN AVE AND W FOSTER AVE
.50
04/22/05
04/23/05
5,282 04/13/05
04/13/05
4,985
100
210 06 0219 / 4459
N WESTERN AVE AND W GRACE ST
1.0
04/14/05
04/15/05
10,563 04/15/05
04/15/05
8,007
100
210 06 0219 / 4459
N WESTERN AVE AND W IRVING PARK RD
1.0
04/15/05
04/16/05
10,563 04/22/05
04/22/05
11,527
100
210 06 0130 / 4389
N WESTERN AVE AND W LAWRENCE AVE
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W LAWRENCE AVE
1.0
10,563 03/01/05
03/01/05
10,084
100
210 06 0130 / 4389
N WESTERN AVE AND W LELAND AVE
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W LELAND AVE
1.0
04/19/05
04/20/05
10,563 03/01/05
03/01/05
10,388
100
210 06 0219 / 4459
N WESTERN AVE AND W MONTROSE AVE
1.0
04/16/05
04/17/05
10,563 03/03/05
03/03/05
8,007
100
210 06 0130 / 4389
N WESTERN AVE AND W SUNNYSIDE AVE
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W WILSON AVE
1.0
10,563 03/16/05
03/16/05
8,007
100
210 06 0130 / 4389
N WESTERN AVE AND W WINNEMAC AVE
.50
0 04/25/02
04/25/02
3,662
100
210 06 0130 / 4389
N WOLCOTT AVE AND W MONTROSE AVE
1.0
0 04/18/02
04/18/02
7,324
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0128 / 4387
W FOSTER AVE AND N LEAVITT ST
Work Type: New Signal
04/13/05
04/20/05
04/18/05
04/14/05
04/21/05
04/19/05
14.50
79,223
92,250
7,500
0
Locations .50
12/31/01
01/31/02
Locations
210 06 0205 / 4448
W ADDISON ST AND N WOLCOTT AVE
1.0
01/02/06
07/31/07
192,500 01/24/06
210 06 0073 / 4337
1900 W MONTROSE AVE
1.0
01/31/02
11/15/02
130,000 12/17/01
2.0
Totals per New Signal
Work Type: Pedestrian Countdown Signal Install
322,500
N DAMEN AVE AND W LAWRENCE AVE
.0
03/15/06
05/08/07
12,000 01/26/07
210 06 / 32280
W IRVING PARK RD AND N WESTERN AVE
.0
12/29/08
01/31/09
10,500
Totals per Traffic
219,904
95
136,286
100
356,190
Locations
210 06 0243 / 4480
Totals per Pedestrian Countdown Signal Install
11/29/02
.0
02/22/07
5,773
100
0
0
22,500
5,773
1,185,853
2,080,072
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 511
1/1/2008 AND 12/31/2008
Ward 47 Gene Schulter CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Installations
Work Type: Pedestrian Countdown Signal Installation 210 06 / 32276
W ADDISON ST AND N PAULINA ST
Work Type: Signals 300 06 0096 / 5258
4.0
11/21/07
11/26/07
5,760 12/10/07
12/14/07
3,425
100
11/20/03
11/25/03
0 09/18/03
09/22/03
5,850
100
Intersections
4237 N LINCOLN AVE
Work Type: TSM Install
37.0
Locations
210 06 0183 / 4429
N WESTERN AVE AND W WAVELAND AVE
1.0
03/01/04
07/31/05
224,388 12/18/03
07/07/05
234,600
100
814 06 0135 / 16349
4800 N LEAVITT ST
1.0
07/12/93
07/12/93
0 07/12/93
07/12/93
81,947
100
814 06 0328 / 16532
3800 N LINCOLN AVE
1.0
09/01/96
09/01/96
0 09/01/96
01/06/97
60,000
100
300 06 0078 / 5241
4600 N LINCOLN AVE
1.0
04/01/98
12/01/98
31,165 11/05/99
02/01/00
31,165
100
300 06 0117 / 5271
4600 N LINCOLN AVE
1.0
12,335 11/05/99
02/01/00
0
100
814 06 0342 / 16540
5046 N LINCOLN AVE
1.0
02/10/97
02/10/97
0 02/10/97
07/22/97
200,000
100
210 06 0106 / 4366
4800 N OAKLEY AVE
1.0
11/20/00
04/15/01
146,619 11/14/00
03/07/01
158,458
100
210 06 0039 / 4309
3600 N RAVENSWOOD AVE
06/01/99
09/30/00
333,352 03/16/00
10/16/00
327,887
100
814 06 0299 / 16511
4000 N SOUTHPORT AVE
1.0
07/03/91
07/03/91
0 07/03/91
07/03/91
115,984
100
814 06 0300 / 16512
3800 N WESTERN AVE
1.0
10/25/90
10/25/90
0 10/25/90
10/25/90
86,982
100
814 06 0302 / 16514
4400 N WESTERN AVE
1.0
11/07/91
11/07/91
0 11/07/91
11/07/91
169,050
100
814 06 0197 / 16409
4800 N WOLCOTT AVE
1.0
08/14/96
08/14/96
0 08/14/96
08/14/96
150,000
100
11.0
Totals per TSM Install
Work Type: Traffic Equipment Painting 300 11 / 32190
ON W BELMONT AVE FROM N WESTERN AVE TO N CALIFORNIA AVE
747,859
1,616,073
Locations 1.65
05/15/07
06/01/07
512 05/15/07
06/01/07
512
Totals per Construction Phase
2,494,088
3,415,336
Totals for Ward 47
2,506,388
3,425,743
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 512
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 0308 / 5414
ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE
.0
02/01/06
07/31/06
0 02/01/06
300 06 / 32277
ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD
.0
04/01/08
08/30/08
0
300 06 / 32146
ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE
.0
05/01/07
10/31/07
3,900 06/19/07
300 06 / 32277
ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD
4.0
04/01/08
08/30/08
260,000 05/14/08
300 06 / 32146
ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY
.0
05/01/07
10/31/07
300 06 / 32146
ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY
300 06 0285 / 5393
5556 N SHERIDAN RD
281 00 / 33670
1135-1141 W GLENLAKE AVE
Totals per Design/Engineering
Work Type: Feasibility Study
07/31/06
3,123
100
0
0
07/19/07
4,811
100
0
50
5,000 07/02/07
08/15/07
4,811
100
.0
05/01/07
10/31/07
5,000 06/15/07
07/20/07
4,811
100
1.0
05/01/04
08/01/04
0 05/11/04
08/11/04
2,617
100
.0
01/01/08
12/31/08
0
0
0
273,900
20,173
5.0
Projects
302 00 0079 / 5767
ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
302 00 0079 / 5767
N LAKEWOOD AVE AND W BALMORAL AVE
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
302 00 0079 / 5767
5701 N SHERIDAN RD
.0
10/25/01
10/25/01
0 10/25/01
10/25/01
0
100
Totals per Feasibility Study Totals per Lighting/Electrical
.0
0
0
273,900
20,173
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 513
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 06 0307 / 5413
ON N GREENVIEW AVE FROM W HOOD AVE TO W DEVON AVE
2.0
02/01/06
05/31/06
800 01/16/05
02/10/06
497
100
300 06 0307 / 5413
ON W HOOD AVE FROM N GREENVIEW AVE TO N CLARK ST
4.0
02/03/06
05/31/06
1,600 01/16/05
02/10/06
995
100
300 06 0307 / 5413
ON W ROSEMONT AVE FROM N GLENWOOD AVE TO N BROADWAY
1.50
02/02/06
05/31/06
600 01/16/05
02/10/06
373
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout
7.50
3,000
1,865
Fixtures
300 06 0069 / 5233
ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE
95.16
12/02/02
12/02/02
38,064 11/30/02
11/30/02
23,398
100
300 06 0122 / 5275
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
52.29
12/15/03
12/21/03
20,916 12/09/03
12/14/03
15,193
100
300 06 0307 / 5413
ON W GRANVILLE AVE FROM N GLENWOOD AVE TO N GREENVIEW AVE
.50
02/02/06
05/31/06
200 01/16/05
02/10/06
124
100
300 06 0069 / 5233
5700 N SHERIDAN RD
16.0
08/11/02
08/11/02
6,400 08/08/02
08/08/02
4,060
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
163.95
65,580
42,775
2,762,085
1,695,952
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 514
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
300 06 0096 / 5258
5533 N BROADWAY
983.0
302 00 0092 / 5774
5533 N BROADWAY
6.0
302 00 0083 / 5768
5146 N CLARK ST
805 06 1261 / 7447
5146 N CLARK ST
302 00 0084 / 5769
4735 N CLIFTON AVE
805 06 1307 / 7493
4735 N CLIFTON AVE
302 00 0084 / 5769
4751 N CLIFTON AVE
805 06 1314 / 7500
4751 N CLIFTON AVE
302 00 0084 / 5769
4755 N CLIFTON AVE
805 06 1317 / 7503
4755 N CLIFTON AVE
1.0
12/05/97
805 06 1168 / 7354
5320 N KENMORE AVE
1.0
06/01/95
302 00 0083 / 5768
4861 N MAGNOLIA AVE
805 06 1277 / 7463
4861 N MAGNOLIA AVE
1.0
12/05/97
805 06 1888 / 8074
5100 N MARINE DR
1.0
12/23/96
302 00 0084 / 5769
4705 N RACINE AVE
805 06 1327 / 7513
4705 N RACINE AVE
302 00 0084 / 5769
4721 N RACINE AVE
805 06 1333 / 7519
4721 N RACINE AVE
302 00 0084 / 5769
4731 N RACINE AVE
805 06 1306 / 7492
4731 N RACINE AVE
1.0
12/05/97
805 06 0460 / 6646
6312 N WINTHROP AVE
1.0
805 06 1125 / 7311
1040 W GRANVILLE AVE
1.0
302 00 0084 / 5769
1255 W WINNEMAC AVE
805 06 0458 / 6644
1255 W WINNEMAC AVE
1.0
06/01/95
805 06 1443 / 7629
1255 W WINNEMAC AVE
1.0
12/05/97
302 00 0084 / 5769
1311 W WINNEMAC AVE
805 06 1447 / 7633
1311 W WINNEMAC AVE
302 00 0084 / 5769
1329 W WINNEMAC AVE
805 06 1449 / 7635
1329 W WINNEMAC AVE
1.0
12/05/97
805 06 1776 / 7962
900 W WINONA ST
1.0
04/16/97
Totals per Alley Lighting/Lamps
1.0
1.0
1.0
1.0
1.0
1.0
1,006.0
03/01/03
0 03/01/06
09/01/06
29,700
0
0 01/26/01
01/29/02
1,414
100
0 11/18/97
11/18/97
267
100
0 12/05/97
12/05/97
300
100
0 06/01/98
06/01/98
275
100
0 12/05/97
12/05/97
300
100
0 06/01/98
06/01/98
275
100
0 12/05/97
12/05/97
300
100
0 06/01/98
06/01/98
275
100
12/05/97
0 12/05/97
12/05/97
300
100
06/01/95
0 06/01/95
06/01/95
300
100
0 11/24/97
11/24/97
267
100
12/05/97
0 12/05/97
12/05/97
300
100
12/23/96
0 12/23/96
12/23/96
300
100
0 07/20/98
07/20/98
275
100
0 12/05/97
12/05/97
300
100
0 07/20/98
07/20/98
275
100
0 12/05/97
12/05/97
300
100
0 07/20/98
07/20/98
275
100
12/05/97
0 12/05/97
12/05/97
300
100
11/18/96
11/18/96
0 11/18/96
11/18/96
300
100
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
0 09/30/98
09/30/98
276
100
06/01/95
0 06/01/95
06/01/95
300
100
12/05/97
0 12/05/97
12/05/97
300
100
0 09/30/98
09/30/98
276
100
0 12/05/97
12/05/97
300
100
0 09/30/98
09/30/98
276
100
12/05/97
0 12/05/97
12/05/97
300
100
04/16/97
0 04/16/97
04/16/97
300
100
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
09/01/03
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
12/05/97
0
39,226
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 515
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Arterial Group Relamping 300 06 0238 / 5352
5533 N BROADWAY
Work Type: Arterial Strt Lighting/Lamps 300 11 / 32237
ON N BROADWAY FROM W LELAND AVE TO N RACINE AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
5533 N BROADWAY
Work Type: Flood Light Install
Lamps 968.0
06/01/07
12/31/07
28,497 08/01/07
08/17/07
28,497
100
0
0
Blocks 1.0
17,000
Installations 873.0
0 04/14/02
04/17/02
15,896
100
Fixtures
300 06 0167 / 5306
5917 N BROADWAY
2.0
0 12/10/99
12/10/99
702
100
302 00 0092 / 5774
6215 N KENMORE AVE
1.0
0 10/15/01
10/15/01
404
100
302 00 0092 / 5774
5005 N WINTHROP AVE
2.0
0 03/22/01
03/22/01
941
100
5.0
0
2,047
0
0
0
64,563
100
0
0
0
95,000
64,563
0
1,460
100
0
0
0
Totals per Flood Light Install
Work Type: Lighting Imprvmnts 281 00 / 33670
1135-1141 W GLENLAKE AVE
Work Type: Lighting Imprvmnts 300 06 0285 / 5393
5556 N SHERIDAN RD
281 00 / 33670
Project has been completed.(100%) Note Last Updated on 05-SEP-06 1135-1141 W GLENLAKE AVE
Totals per Lighting Imprvmnts
Work Type: Lighting Imprvmnts 300 06 0201 / 5325
W GRANVILLE AVE AND N WINTHROP AVE
Work Type: Loop Lighting 281 00 / 33670
1135-1141 W GLENLAKE AVE
Work Type: Ornamental Lighting 300 06 0120 / 5274
934-1200 W BRYN MAWR AVE
281 00 / 33670
1135-1141 W GLENLAKE AVE
Totals per Ornamental Lighting
Blocks .0
01/01/08
12/31/08
1.0
08/11/04
08/15/06
.0
01/01/08
12/31/08
Installations
1.0
95,000 08/23/04
05/15/06
Projects 1.0
Blocks .0
01/01/08
12/31/08
2.50
10/18/99
02/04/00
.0
01/01/08
12/31/08
Blocks
2.50
600,000 10/18/99
02/04/00
202,287
0
0
600,000
202,287
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 516
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: POD Camera Pole 281 00 / 33670
1135-1141 W GLENLAKE AVE
Work Type: Residential Regrouping 300 06 0270 / 5378
5533 N BROADWAY
Work Type: Residntl Staggered Lighting
Poles .0
01/01/08
12/31/08
0
0
0
03/01/08
12/01/08
0
0
0
Lamps .0
Blocks
300 07 0046 / 5469
ON N GLENWOOD AVE FROM W ARGYLE ST TO W FOSTER AVE
1.0
08/07/06
10/06/06
72,500 11/02/06
04/16/07
48,783
100
300 06 0308 / 5414
ON N KENMORE AVE FROM W ARDMORE AVE TO W THORNDALE AVE
2.0
06/26/06
08/25/06
189,505 06/26/06
09/15/06
126,957
100
300 06 / 32277
ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD
.0
05/04/08
12/31/08
300 11 / 32235
ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
2.0
04/01/08
06/02/08
300 11 / 32237
ON N KENMORE AVE FROM W LAWRENCE AVE TO W FOSTER AVE
2.0
04/01/08
300 06 / 32146
ON N MAGNOLIA AVE FROM N RIDGE AVE TO W ROSEDALE AVE
2.0
12/03/07
300 06 / 32277
Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway-all under same project Note Last Updated on 04-MAR-08 ON N WINTHROP AVE FROM W GRANVILLE AVE TO W SHERIDAN RD .0 05/04/08 12/31/08 0
300 06 0298 / 5405
ON N WINTHROP AVE FROM W THORNDALE AVE TO W GRANVILLE AVE
2.0
06/15/05
07/15/05
300 06 / 32146
ON W EARLY AVE FROM N WAYNE AVE TO N BROADWAY
1.0
12/05/07
06/18/08
300 06 / 32146 300 07 0048 / 5471
0
0
72,500 10/29/07
04/18/08
59,547
100
06/02/08
55,000 10/29/07
04/18/08
45,000
100
05/30/08
317,516 12/06/07
0
50
0
0
131,505
100
0
50
Magnolia: Ridge to to Rosedale-Victoria: Wayne to Broadway--Early: Wayne to Broadway- all on a single project Note Last Updated on 04-MAR-08 ON W VICTORIA ST FROM N WAYNE AVE TO N BROADWAY 1.0 10/05/07 04/29/08 317,516
0
50
W WINONA ST AND N WINTHROP AVE
4,000
0
0
1,346,053
411,792
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON N WINTHROP AVE FROM W AINSLIE ST TO W WINONA ST
300 06 0069 / 5233
ON W ARGYLE ST FROM N CLARK ST TO N MAGNOLIA AVE
300 06 0267 / 5375
ON W ELMDALE AVE FROM N GLENWOOD AVE TO N BROADWAY
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Arterial 281 00 / 33670
0
1135-1141 W GLENLAKE AVE
.20
04/18/06
11/18/06
13.20
0 06/14/05
08/05/05
317,516
Blocks 2.0
05/01/03
07/01/03
201,214 04/28/03
06/27/03
179,171
100
1.04
10/15/03
01/15/04
57,200 10/14/03
12/05/03
42,167
100
2.0
08/31/04
12/15/04
149,400 08/31/04
12/03/04
153,247
100
5.04
407,814
374,585
0
0
Locations .0
01/01/08
12/31/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 517
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Short Arm Installs - Residntl
Locations
302 00 0092 / 5774
1000 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1018 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1028 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1038 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1048 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1058 W ARDMORE AVE
1.0
0 02/13/01
02/13/01
378
100
302 00 0092 / 5774
1050 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1051 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1115 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1124 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1129 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1136 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1150 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1155 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1214 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
302 00 0092 / 5774
1230 W ARGYLE ST
1.0
0 03/15/01
03/15/01
378
100
281 00 / 33670
1135-1141 W GLENLAKE AVE
302 00 0092 / 5774
1256 W VICTORIA ST
1.0
0 05/07/01
302 00 0092 / 5774
1268 W VICTORIA ST
1.0
302 00 0092 / 5774
1280 W VICTORIA ST
1.0
Totals per Short Arm Installs - Residntl
Work Type: Strt Light Pole Painting 302 00 0076 / 5764
ON N BROADWAY FROM W LAWRENCE AVE TO W GRANVILLE AVE
302 00 0079 / 5767
ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST
300 06 0058 / 5229
.0
01/01/08
12/31/08
19.0
0
0
0
05/07/01
378
100
0 05/07/01
05/07/01
378
100
0 05/07/01
05/07/01
378
100
0
7,182
Locations 209.0
05/05/98
05/21/98
0 05/05/98
05/21/98
3,553
100
52.0
12/01/01
12/31/01
18,000 10/22/01
11/09/01
14,929
100
ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE
50.49
09/20/02
10/20/02
11,550 09/20/02
10/30/02
11,550
100
300 06 0108 / 5263
ON W FOSTER AVE FROM N MARINE DR TO N ASHLAND AVE
67.23
03/01/04
03/10/04
19,837 04/12/04
05/07/04
16,442
100
302 00 0079 / 5767
N LAKEWOOD AVE AND W BALMORAL AVE
1.0
03/15/02
06/30/02
11,200 10/22/01
11/09/01
9,953
100
302 00 0079 / 5767
5701 N SHERIDAN RD
12.0
08/01/02
08/01/02
1,500 07/25/02
08/06/02
6,020
100
300 06 0058 / 5229
1100 W CATALPA AVE
4.0
09/27/02
09/27/02
560 10/28/02
10/29/02
560
100
Totals per Strt Light Pole Painting
395.72
62,647
63,007
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 518
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Light Pole Replacmnt/Reloc 300 06 0225 / 5340
4720 N BROADWAY
281 00 / 33670
1135-1141 W GLENLAKE AVE
Totals per Strt Light Pole Replacmnt/Reloc
Work Type: Strt Lighting 302 00 0092 / 5774
ON N RIDGE AVE FROM N BROADWAY TO N CLARK ST
302 00 0089 / 5771
ON W AINSLIE ST FROM N SHERIDAN RD TO N WINTHROP AVE
302 00 0091 / 5773
ON W ARGYLE ST FROM N SHERIDAN RD TO N WINTHROP AVE
300 06 0076 / 5239
ON W THORNDALE AVE FROM N WINTHROP AVE TO N BROADWAY
302 00 0088 / 5770
Blocks 1.0
11/18/03
11/26/03
.0
01/01/08
12/31/08
1.0
20,000 12/04/03
02/06/04
29,059
100
0
0
0
20,000
29,059
Blocks 02/01/02
03/31/02
18,000 02/27/02
04/01/02
47,602
100
0 04/16/99
06/24/99
0
100
491 02/13/01
02/13/01
193
100
58,500 02/24/99
12/30/99
66,503
100
ON W WINNEMAC AVE FROM N BROADWAY TO N GLENWOOD AVE
0 01/07/98
06/08/98
33,761
100
302 00 0088 / 5770
ON W WINONA ST FROM N GLENWOOD AVE TO N CLARK ST
0 04/07/98
06/03/98
33,761
100
302 00 0091 / 5773
5700 N WINTHROP AVE
1.0
9,500 04/06/00
04/06/00
2,915
100
302 00 0091 / 5773
5700-5799 N WINTHROP AVE
1.0
9,295 02/13/01
02/13/01
0
100
.50 06/01/00
09/15/00
54.50
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
52.0
5533 N BROADWAY
95,786
184,735
Lamps 1,280.0
03/01/04
12/01/04
6,656 11/03/06
12/05/06
13,939
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 519
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0217 / 5337
5533 N BROADWAY
250.0
07/21/04
07/28/04
14,052 07/02/04
07/12/04
13,782
100
805 06 2868 / 9054
1195 W AINSLIE ST
10.0
11/11/93
11/11/93
0 11/11/93
11/11/93
7,500
100
805 06 2873 / 9059
1199 W ARDMORE AVE
14.0
12/27/93
12/27/93
0 12/27/93
12/27/93
10,500
100
805 06 2719 / 8905
1195 W ARGYLE ST
22.0
03/20/94
03/20/94
0 03/20/94
03/20/94
16,500
100
805 06 2870 / 9056
1199 W BALMORAL AVE
14.0
12/09/93
12/09/93
0 12/09/93
12/09/93
10,500
100
805 06 2296 / 8482
1199 W BERWYN AVE
22.0
09/25/96
09/25/96
0 09/25/96
09/25/96
16,500
100
805 06 2194 / 8380
937 W BRYN MAWR AVE
18.0
12/31/95
12/31/95
0 12/31/95
12/31/95
13,500
100
805 06 2871 / 9057
1198 W BRYN MAWR AVE
40.0
02/11/94
02/11/94
0 02/11/94
02/11/94
30,000
100
302 00 0072 / 5760
1120 W CATALPA AVE
1.0
0 01/18/00
02/04/00
15,500
100
805 06 2151 / 8337
1195 W CATALPA AVE
11.0
12/31/94
12/31/94
0 12/31/94
12/31/94
8,250
100
805 06 2869 / 9055
1199 W FOSTER AVE
14.0
02/17/93
02/17/93
0 02/17/93
02/17/93
10,500
100
302 00 0071 / 5759
1120 W GLENLAKE AVE
0 04/04/99
04/13/99
14,256
100
805 06 2152 / 8338
1200 W GLENLAKE AVE
11.0
12/31/94
12/31/94
0 12/31/94
12/31/94
8,250
100
805 06 2872 / 9058
1199 W HOLLYWOOD AVE
14.0
01/21/94
01/21/94
0 01/21/94
01/21/94
10,500
100
805 06 2720 / 8906
1199 W THORNDALE AVE
22.0
03/30/94
03/30/94
0 03/30/94
03/30/94
16,500
100
805 06 2616 / 8802
1199 W WINONA ST
14.0
11/11/94
11/11/94
0 11/11/94
11/11/94
10,500
100
Totals per Underpass Lighting
477.0
14,052
213,038
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 520
1/1/2008 AND 12/31/2008
Ward 48 Mary Ann Smith CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: Pedestrian Countdown Signal Install 210 06 / 32280
N BROADWAY AND W FOSTER AVE
Work Type: Removal Temp Wiring - Signals
Locations .0
05/04/08
12/31/08
10,800
0
0
Crossings
300 06 0197 / 5322
N BROADWAY AND W ARDMORE AVE
2.0
8,000 12/05/01
12/07/01
4,737
100
300 06 0197 / 5322
N BROADWAY AND W BERWYN AVE
1.0
4,000 12/03/01
12/05/01
3,842
100
Totals per Removal Temp Wiring - Signals
Work Type: Signals 300 06 0096 / 5258
5533 N BROADWAY
Work Type: TSM Install
3.0
12,000
8,579
Intersections 33.0
11/19/03
11/23/03
0 09/21/06
09/26/06
5,218
100
65,450 12/09/99
02/11/00
50,081
100
Locations
210 06 0020 / 4295
W FOSTER AVE AND N GLENWOOD AVE
01/15/01
03/15/01
300 07 0048 / 5471
W FOSTER AVE AND N SHERIDAN RD
1.0
11/17/05
04/03/06
814 06 0077 / 16293
5929 N BROADWAY
1.0
12/06/94
12/06/94
0 12/06/94
12/06/94
129,903
100
814 06 0078 / 16294
6000 N BROADWAY
1.0
05/08/95
05/08/95
0 05/08/95
05/08/95
97,884
100
814 06 0154 / 16368
6200 N BROADWAY
1.0
10/24/94
10/24/94
0 10/24/94
10/24/94
101,516
100
814 06 0145 / 16359
5599 N KENMORE AVE
1.0
02/27/92
02/27/92
0 02/27/92
02/27/92
90,110
100
814 06 0147 / 16361
5700 N KENMORE AVE
1.0
02/20/92
02/20/92
0 02/20/92
02/20/92
99,051
100
814 06 0149 / 16363
5700 N RIDGE AVE
1.0
12/23/91
12/23/91
0 12/23/91
12/23/91
99,051
100
814 06 0240 / 16452
5748 N RIDGE AVE
1.0
01/01/91
01/01/91
0 01/01/91
01/01/91
100,000
100
814 06 0151 / 16365
5800 N RIDGE AVE
1.0
12/26/91
12/26/91
0 12/26/91
12/26/91
99,051
100
814 06 0143 / 16357
5600 N SHERIDAN RD
1.0
02/25/92
02/25/92
0 02/25/92
02/25/92
90,110
100
814 06 0074 / 16290
5700 N SHERIDAN RD
1.0
01/01/97
01/01/97
0 06/30/95
06/30/95
37,836
100
814 06 0148 / 16362
5700 N SHERIDAN RD
1.0
02/24/92
02/24/92
0 02/24/92
02/24/92
99,051
100
814 06 0144 / 16358
5599 N WINTHROP AVE
1.0
02/26/92
02/26/92
0 02/26/92
02/26/92
90,110
100
814 06 0152 / 16366
5700 N WINTHROP AVE
1.0
02/21/92
02/21/92
0 02/21/92
02/21/92
99,051
100
14.0
275,000
0
340,450
1,282,805
363,250
1,296,602
Totals per Construction Phase
3,125,335
2,992,553
Totals for Ward 48
3,399,235
3,012,726
Totals per TSM Install Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 521
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32146
ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE
1.0
05/01/07
10/31/07
300 06 / 32277
ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD
.0
04/01/08
08/30/08
0
300 06 0308 / 5414
ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
.0
02/01/06
07/31/06
0 02/01/06
210 06 0023 / 4298
N CLARK ST AND N ROGERS AVE
.0
02/06/02
04/02/02
0 02/06/02
Totals per Design/Engineering
1.0
3,900 06/28/07
3,900
07/19/07
2,374
100
0
0
07/31/06
3,608
100
04/02/02
0
0
5,982
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 522
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: 250 Watt Changeout
Fixtures
300 03 0049 / 4920
W ESTES AVE AND N GREENVIEW AVE
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W ESTES AVE AND N PAULINA ST
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W GREENLEAF AVE AND N GREENVIEW AVE
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W GREENLEAF AVE AND N PAULINA ST
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W LUNT AVE AND N GREENVIEW AVE
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W LUNT AVE AND N PAULINA ST
1.0
09/10/04
09/10/04
375 09/10/04
09/10/04
0
100
Totals per 250 Watt Changeout
Work Type: 400 Watt Changeout 300 03 0040 / 4911
ON N BROADWAY FROM W DEVON AVE TO W ROSEMONT AVE
300 06 0069 / 5233
ON N SHERIDAN RD FROM W FOSTER AVE TO W DEVON AVE
300 03 0049 / 4920
6.0
2,250
0
Fixtures 8.0
08/20/04
09/20/04
3,200 07/14/04
08/10/04
2,092
100
26.84
12/02/02
12/02/02
10,736 11/30/02
11/30/02
6,599
100
W ESTES AVE AND N ASHLAND AVE
3.0
09/10/04
09/10/04
1,400 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W GREENLEAF AVE AND N ASHLAND AVE
3.0
09/10/04
09/10/04
1,400 09/10/04
09/10/04
0
100
300 03 0049 / 4920
W LUNT AVE AND N ASHLAND AVE
3.0
09/10/04
09/10/04
1,400 09/10/04
09/10/04
0
100
Totals per 400 Watt Changeout Totals per Lighting/Electrical
43.84
18,136
8,691
4,693,042
3,001,506
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 523
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Alley Lighting/Lamps
Installations
805 06 0721 / 6907
6949 N ASHLAND BLVD
1.0
08/16/96
08/16/96
0 08/16/96
08/16/96
300
100
805 06 1533 / 7719
7130 N CLARK ST
1.0
10/21/97
10/21/97
0 10/21/97
10/21/97
300
100
805 06 1128 / 7314
6964 N GREENVIEW AVE
1.0
02/14/96
02/14/96
0 02/14/96
02/14/96
300
100
300 06 0139 / 5289
7356 N GREENVIEW AVE
621.0
03/01/04
12/01/04
0 05/10/06
05/20/06
18,763
100
302 00 0092 / 5774
7356 N GREENVIEW AVE
3.0
0 03/16/01
12/12/01
707
100
805 06 0599 / 6785
7434 N OAKLEY AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0680 / 6866
6971 N RIDGE BLVD
1.0
08/01/96
08/01/96
0 08/01/96
08/01/96
300
100
805 06 0661 / 6847
7053 N RIDGE BLVD
1.0
08/01/96
08/01/96
0 08/01/96
08/01/96
300
100
805 06 0646 / 6832
6548 N SHERIDAN RD
1.0
03/14/97
03/14/97
0 03/14/97
03/14/97
300
100
805 06 0647 / 6833
7021 N SHERIDAN RD
1.0
03/14/97
03/14/97
0 03/14/97
03/14/97
300
100
805 06 0648 / 6834
7025 N SHERIDAN RD
1.0
03/12/97
03/12/97
0 03/12/97
03/12/97
300
100
805 06 0633 / 6819
7714 N SHERIDAN RD
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 0436 / 6622
7319 N WOLCOTT AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 0857 / 7043
1565 W BIRCHWOOD AVE
1.0
08/01/96
08/01/96
0 08/01/96
08/01/96
300
100
805 06 0858 / 7044
1836 W BIRCHWOOD AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1957 / 8143
1811 W CHASE AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1529 / 7715
1718 W ESTES AVE
1.0
11/12/97
11/12/97
0 11/12/97
11/12/97
300
100
805 06 0860 / 7046
1425 W FARGO AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1100 / 7286
1638 W GREENLEAF AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1101 / 7287
1920 W GREENLEAF AVE
1.0
12/02/96
12/02/96
0 12/02/96
12/02/96
300
100
805 06 1130 / 7316
2030 W GREENLEAF AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
805 06 1831 / 8017
1319 W LUNT AVE
1.0
10/03/96
10/03/96
0 10/03/96
10/03/96
300
100
805 06 1889 / 8075
1509 W LUNT AVE
1.0
02/14/96
02/14/96
0 02/14/96
02/14/96
300
100
805 06 1918 / 8104
1530 W MORSE AVE
1.0
02/14/96
02/14/96
0 02/14/96
02/14/96
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
7356 N GREENVIEW AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
7356 N GREENVIEW AVE
646.0
0
26,070
Lamps 687.0
06/01/07
12/31/07
20,225 08/01/07
08/18/07
20,225
100
0 04/18/02
04/21/02
10,779
100
Installations 592.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 524
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Flood Light Install
Fixtures
300 06 0167 / 5306
7442 N ASHLAND AVE
1.0
0 01/11/99
01/11/99
351
100
300 06 0167 / 5306
7300-7400 N GREENVIEW AVE
3.0
0 11/09/99
11/09/99
1,053
100
300 06 0167 / 5306
7410 N GREENVIEW AVE
1.0
0 08/14/99
08/14/99
351
100
5.0
0
Totals per Flood Light Install
Work Type: Ornamental - Piggyback Lighting 300 06 0069 / 5233
ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST
Fixtures 6.0
11/20/02
12/05/02
27,600 11/10/02
Work Type: Ornamental Lighting
Blocks
300 07 0049 / 5472
7700 N ASHLAND AVE
1.0
04/18/06
11/18/06
2,000
300 11 / 32238
7700 N ASHLAND AVE
1.0
01/18/07
01/18/07
2,000 01/18/07
300 07 0049 / 5472
7500 N SEELEY AVE
1.0
04/18/06
11/18/06
2,000
300 11 / 32238
7500 N SEELEY AVE
1.0
01/18/07
01/18/07
2,000 01/18/07
Totals per Ornamental Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
7356 N GREENVIEW AVE
1,755
4.0
12/06/02
29,679
0
0
01/18/07
834
100
0
0
01/18/07
834
100
8,000
1,668
0
0
100
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 525
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 11 / 32238
ON N ASHLAND AVE FROM W JONQUIL TER TO W JUNEWAY TER
1.0
04/01/08
06/27/08
300 06 / 32146
ON N BELL AVE FROM W TOUHY AVE TO W JARVIS AVE
4.0
12/05/07
06/27/08
247,147 12/07/07
300 07 0049 / 5472
Hamilton from Touhy to Jarvis under the same project Note Last Updated on 04-MAR-08 ON N CLAREMONT AVE FROM W TOUHY AVE TO W HOWARD ST 4.0
04/18/06
11/18/06
280,000 09/27/06
300 09 / 33115
ON N DAMEN AVE FROM N ROGERS AVE TO W JARVIS AVE
2.0
130,000 04/01/08
300 05 0049 / 5164
ON N HONORE ST FROM W CHASE AVE TO N ROGERS AVE
1.0
300 09 / 33115
ON N HOYNE AVE FROM W JARVIS AVE TO W HOWARD ST
2.0
300 06 / 32277
ON N KENMORE AVE FROM W GRANVILLE AVE TO W SHERIDAN RD
300 09 / 33115
ON N OAKLEY AVE FROM W TOUHY AVE TO W HOWARD ST
4.0
280,000 04/01/08
300 09 / 33115
ON N SEELEY AVE FROM W JARVIS AVE TO W FARGO AVE
1.0
300 05 0049 / 5164
ON N WOLCOTT AVE FROM W TOUHY AVE TO N ROGERS AVE
2.0
04/04/05
11/18/05
300 11 / 32238
ON W ALBION AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD
1.0
04/01/08
06/27/08
71,500
300 05 0049 / 5164
ON W CHASE AVE FROM N DAMEN AVE TO N ROGERS AVE
1.0
04/04/05
11/18/05
50,000 11/01/05
300 11 / 32238
ON W COLUMBIA AVE FROM N LAKEWOOD AVE TO N SHERIDAN RD
1.0
04/01/08
06/27/08
300 11 / 32238
ON W ESTES AVE FROM N ASHLAND BLVD TO N CLARK ST
1.0
300 07 0049 / 5472
ON W ESTES AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
2.0
04/18/06
11/18/06
300 07 0049 / 5472
ON W FARWELL AVE FROM N ASHLAND BLVD TO N GLENWOOD AVE
1.0
04/18/06
11/18/06
300 11 / 32238
ON W FARWELL AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
2.0
04/01/08
06/27/08
300 11 / 32238
ON W GREENLEAF AVE FROM N ASHLAND BLVD TO N CLARK ST
2.0
300 06 0308 / 5414
ON W GREENLEAF AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
2.0
05/08/06
07/14/06
300 05 0049 / 5164
Project has been completed as of 07/14/2006 Note Last Updated on 25-AUG-06 ON W JARVIS AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE
1.0
04/04/05
300 05 0049 / 5164
ON W JARVIS AVE FROM N CLARK ST TO N ASHLAND BLVD
2.0
04/04/05
300 05 0049 / 5164
ON W JONQUIL TER FROM N SHERIDAN RD TO N ASHLAND AVE
2.0
300 07 0049 / 5472
ON W JUNEWAY TER FROM N ASHLAND AVE TO N HASKINS AVE
300 07 0049 / 5472
.0
04/04/05
11/18/05
05/04/08
12/31/08
40,000
0
0
0
75
04/27/07
261,872
100
12/01/08
0
0
50,000 11/01/05
03/22/06
45,748
100
167,500 04/01/08
12/01/08
0
0
0
0
12/01/08
0
0
32,500 04/01/08
12/01/08
0
0
170,000 11/01/05
03/22/06
91,496
100
0
0
03/22/06
45,748
100
71,500
0
0
45,000
0
0
0
170,000 08/10/06
10/06/06
179,415
100
70,000 09/13/06
10/31/06
67,868
100
150,000
0
0
130,000
0
0
219,094 05/08/06
07/14/06
151,913
100
11/18/05
85,000 10/28/05
03/22/06
116,148
100
11/18/05
120,000 11/30/05
03/22/06
107,562
100
04/04/05
11/18/05
110,000 10/21/05
03/22/06
122,595
100
2.0
04/18/06
11/18/06
170,000 10/19/06
05/04/07
160,890
100
ON W LUNT AVE FROM N ASHLAND BLVD TO N GREENVIEW AVE
1.0
04/18/06
11/18/06
70,000 09/13/06
10/31/06
67,867
100
300 06 0298 / 5405
ON W LUNT AVE FROM N GREENVIEW AVE TO N SHERIDAN RD
2.0
0 06/10/05
08/22/05
94,038
100
300 11 / 32238
ON W LUNT AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
3.0
04/01/08
06/27/08
150,000
0
0
300 11 / 32238
ON W MORSE AVE FROM N RAVENSWOOD AVE TO N RIDGE BLVD
3.0
04/01/08
06/27/08
150,000
0
0
3,229,241
1,513,160
Totals per Residntl Staggered Lighting
50.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 526
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Strt Lighting/Lamps
Blocks
300 03 0049 / 4920
ON N BOSWORTH AVE FROM W HOWARD ST TO W JONQUIL TER
10/15/04
12/15/04
80,000 11/08/04
02/15/05
47,191
100
300 03 0049 / 4920
ON N GREENVIEW AVE FROM W FARWELL AVE TO W LUNT AVE
07/20/04
09/20/04
140,000 08/03/04
02/15/05
94,257
100
300 03 0049 / 4920
ON N MARSHFIELD AVE FROM W HOWARD ST TO W JUNEWAY TER
09/20/04
11/20/04
171,000 10/19/04
02/15/05
130,365
100
300 06 0122 / 5275
ON N PAULINA ST FROM W HOWARD ST TO W JUNEWAY TER
11/15/03
01/15/04
175,000 10/16/03
12/09/03
156,063
100
300 03 0049 / 4920
ON N SEELEY AVE FROM W HOWARD ST TO W FARGO AVE
10/01/04
12/01/04
160,000 10/22/04
05/02/05
127,835
100
300 03 0049 / 4920
ON N WAYNE AVE FROM W MORSE AVE TO W PRATT BLVD
10/15/04
12/15/04
130,000 11/08/04
02/15/05
72,808
100
300 06 0267 / 5375
ON N WOLCOTT AVE FROM W HOWARD ST TO W FARGO AVE
08/01/04
09/01/04
148,760 08/12/04
12/10/04
143,771
100
300 03 0049 / 4920
ON W FARGO AVE FROM N GREENVIEW AVE TO N ASHLAND BLVD
11/15/04
01/15/05
95,000 11/08/04
02/15/05
62,218
100
300 03 0049 / 4920
ON W FARWELL AVE FROM N CLARK ST TO N ASHLAND BLVD
10/15/04
12/15/04
90,000 11/10/04
02/14/05
56,953
100
300 06 0254 / 5364
1707 W MORSE AVE
08/01/03
08/29/03
105,245 08/11/03
09/02/03
96,198
100
Totals per Residntl Strt Lighting/Lamps
Work Type: Short Arm Installs - Residntl 302 00 0092 / 5774
2.0
2.0
2.0 6.0
1.0
Work Type: Strt Light Pole Painting
Locations
ON N BROADWAY FROM W ROSEMONT AVE TO W DEVON AVE
300 04 0216 / 5114
ON N SHERIDAN RD FROM W DEVON AVE TO W ALBION AVE
300 06 0058 / 5229
ON N SHERIDAN RD FROM W LAWRENCE AVE TO W DEVON AVE
300 06 0058 / 5229 300 06 0058 / 5229
987,659
Locations
2000 W BIRCHWOOD AVE
300 03 0040 / 4911
1,295,005
0 03/26/01
03/26/01
378
100
8.0
05/10/04
09/10/04
2,200 05/10/04
08/01/04
2,160
100
14.0
05/01/06
11/01/06
3,028 05/17/06
08/05/06
3,028
100
50.49
09/20/02
10/20/02
11,550 09/20/02
10/30/02
11,550
100
ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST
15.0
09/27/02
10/15/02
7,910 10/07/02
10/30/02
7,910
100
ON W TOUHY AVE FROM N SHERIDAN RD TO N CLARK ST
31.0
09/27/02
10/19/02
8,610 10/07/02
11/20/02
8,610
100
Totals per Strt Light Pole Painting
Work Type: Strt Lighting
118.49
33,298
33,258
Blocks
302 00 0092 / 5774
ON W PRATT AVE FROM N GLENWOOD AVE TO N CLARK ST
1.0
03/01/02
03/31/02
15,000 12/10/01
12/10/01
6,228
100
300 06 0078 / 5241
7500 S HERMITAGE AVE
1.0
04/01/98
12/01/98
10,620 07/21/00
08/30/00
18,634
100
2.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping 300 06 0139 / 5289
7356 N GREENVIEW AVE
25,620
24,862
Lamps 1,848.0
03/01/04
12/01/04
9,610 11/06/06
11/07/06
20,125
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 527
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Underpass Lighting
Fixtures
300 06 0217 / 5337
7356 N GREENVIEW AVE
428.0
07/29/04
08/09/04
24,057 07/13/04
07/23/04
8,560
100
805 06 2651 / 8837
7398 N ROGERS AVE
10.0
12/14/94
12/14/94
0 12/14/94
12/14/94
7,500
100
805 06 2852 / 9038
7492 N ROGERS AVE
14.0
04/23/92
04/23/92
0 04/23/92
04/23/92
10,500
100
805 06 2726 / 8912
6501 N SHERIDAN RD
51.0
02/15/95
02/15/95
0 02/15/95
02/15/95
38,250
100
805 06 2875 / 9061
1899 W BIRCHWOOD AVE
10.0
06/01/93
06/01/93
0 06/01/93
06/01/93
7,500
100
805 06 2460 / 8646
1495 W CHASE AVE
18.0
09/22/95
09/22/95
0 09/22/95
09/22/95
13,500
100
302 00 0071 / 5759
1350 W COLUMBIA AVE
0 03/07/99
03/12/99
11,638
100
805 06 2727 / 8913
1404 W ESTES AVE
12.0
05/10/94
05/10/94
0 05/10/94
05/10/94
9,000
100
805 06 2721 / 8907
1780 W ESTES AVE
8.0
06/30/94
06/30/94
0 06/30/94
06/30/94
6,000
100
805 06 2851 / 9037
1605 W FARGO AVE
25.0
02/09/94
02/09/94
0 02/09/94
02/09/94
18,750
100
805 06 2254 / 8440
1406 W FARWELL AVE
14.0
08/16/96
08/16/96
0 08/16/96
08/16/96
10,500
100
805 06 2725 / 8911
1780 W FARWELL AVE
10.0
07/27/94
07/27/94
0 07/27/94
07/27/94
7,500
100
302 00 0071 / 5759
1120 W GRANVILLE AVE
0 03/20/99
03/30/99
21,337
100
302 00 0071 / 5759
1400 W GREENLEAF AVE
0 03/08/99
03/12/99
6,206
100
805 06 2850 / 9036
1408 W GREENLEAF AVE
14.0
12/28/93
12/28/93
0 12/28/93
12/28/93
10,500
100
805 06 2849 / 9035
1750 W GREENLEAF AVE
10.0
02/01/94
02/01/94
0 02/01/94
02/01/94
7,500
100
805 06 2729 / 8915
1599 W JARVIS AVE
16.0
08/05/94
08/05/94
0 08/05/94
08/05/94
12,000
100
302 00 0071 / 5759
1400 W LUNT AVE
0 03/25/99
04/05/99
20,125
100
805 06 2722 / 8908
1800 W LUNT AVE
10.0
06/28/94
06/28/94
0 06/28/94
06/28/94
7,500
100
805 06 2247 / 8433
1407 W MORSE AVE
21.0
10/15/96
10/15/96
0 10/15/96
10/15/96
15,750
100
805 06 2723 / 8909
1781 W MORSE AVE
10.0
07/12/94
07/12/94
0 07/12/94
07/12/94
7,500
100
805 06 2149 / 8335
1400 W PRATT BLVD
12.0
12/31/94
12/31/94
0 12/31/94
12/31/94
9,000
100
805 06 2675 / 8861
1770 W PRATT BLVD
10.0
11/03/94
11/03/94
0 11/03/94
11/03/94
7,500
100
302 00 0070 / 5758
1120 W ROSEMONT AVE
0 11/25/97
12/01/97
9,975
100
805 06 2124 / 8310
1120 W ROSEMONT AVE
0 12/01/97
12/01/97
9,750
100
302 00 0071 / 5759
1120 W SHERIDAN RD
0 05/18/99
05/27/99
15,856
100
805 06 2728 / 8914
1401 W TOUHY AVE
12.0
05/13/94
05/13/94
0 05/13/94
05/13/94
9,000
100
805 06 2792 / 8978
1760 W TOUHY AVE
6.0
04/13/94
04/13/94
0 04/13/94
04/13/94
4,500
100
Totals per Underpass Lighting
13.0
734.0
12/01/97
12/01/97
24,057
323,197
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 528
1/1/2008 AND 12/31/2008
Ward 49 Joe Moore CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
ON W HOWARD ST FROM N HERMITAGE AVE TO N PAULINA ST
1.0
0 12/18/01
12/18/01
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W HOWARD ST
.50
05/03/05
05/04/05
5,282 04/21/05
04/21/05
5,042
100
210 06 0219 / 4459
N WESTERN AVE AND W TOUHY AVE
.50
04/29/05
04/30/05
5,282 03/11/05
03/11/05
5,042
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow 210 06 0023 / 4298
7356 N GREENVIEW AVE
Work Type: TSM Install
10,563
11,934
Locations
N CLARK ST AND N ROGERS AVE
Work Type: Signals 300 06 0096 / 5258
2.0
04/15/03
05/01/03
6,000 01/08/03
01/15/03
4,801
100
11/25/03
12/01/03
0 09/22/06
09/30/06
6,957
100
Intersections 44.0
Locations
814 06 0064 / 16280
6399 N BROADWAY
1.0
10/06/95
10/06/95
0 10/06/95
10/06/95
111,594
100
814 06 0304 / 16516
6551 N SHERIDAN RD
1.0
06/14/91
06/14/91
0 06/14/91
06/14/91
69,253
100
210 06 0104 / 4364
1900 W LUNT AVE
1.0
12/01/00
03/31/01
170,903 11/20/00
04/26/01
183,550
100
Totals per TSM Install
3.0
170,903
364,397
187,466
388,089
Totals per Construction Phase
4,880,508
3,389,595
Totals for Ward 49
4,884,408
3,395,577
Totals per Traffic
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 529
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Design Work Category: Lighting/Electrical Work Type: Design/Engineering
Projects
300 06 / 32275
ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE
.0
03/01/07
10/31/07
300 06 / 32277
ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
04/01/08
08/30/08
0
300 06 0308 / 5414
ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE
.0
02/01/06
07/31/06
0 02/01/06
210 06 / 32040
W DEVON AVE AND N WESTERN AVE
.0
11/01/06
12/31/07
210 06 0158 / 5058
W PETERSON AVE AND N KIMBALL AVE
.0
08/15/05
12/31/05
300 06 0282 / 5390
W PETERSON AVE AND N RICHMOND ST
Totals per Design/Engineering
.50 .50
3,900 03/06/07
04/03/07
07/31/06
5,000
2,655
0
0
0
2,400
100
1,274
0
0 08/15/05
12/31/05
235
100
500 09/17/04
10/06/04
500
100
9,400
7,064
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 530
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
No of Units
Street Address
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Fixtures
Work Type: 250 Watt Changeout 300 06 0307 / 5413
ON W GRANVILLE AVE FROM N RAVENSWOOD AVE TO N OAKLEY AVE
16.50
02/07/06
05/31/06
6,600 01/16/05
02/10/06
4,100
100
300 06 0307 / 5413
W GRANVILLE AVE AND N LEAVITT ST
2.0
02/07/06
05/31/06
800 01/16/05
02/10/06
497
100
300 06 0069 / 5233
7100 N WASHTENAW AVE
6.0
07/19/02
07/19/02
1,260 07/16/02
07/16/02
1,218
100
300 06 0069 / 5233
3000 W SHERWIN AVE
4.0
07/04/02
07/04/02
840 07/01/02
07/01/02
812
100
28.50
Totals per 250 Watt Changeout
9,500
6,627
Fixtures
Work Type: 400 Watt Changeout 300 09 / 33116
ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD
27.0
05/05/08
05/23/08
8,750 04/25/08
05/02/08
8,750
300 09 / 33116
ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE
6.0
05/12/08
05/23/08
2,400 05/07/08
05/30/08
2,400
100
300 09 / 33116
ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE
300 09 / 33116
ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE
300 03 0040 / 4911 300 03 0050 / 4921
100
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
18.0
05/13/08
05/30/08
7,200 05/13/08
05/23/08
7,200
100
ON W PETERSON AVE FROM N CLARK ST TO N LINCOLN AVE
30.02
08/20/04
09/20/04
12,008 08/01/04
08/20/04
7,847
100
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
46.08
10/01/04
10/20/04
18,432 08/27/04
09/06/04
12,834
100
Totals per 400 Watt Changeout
127.10
48,790
39,031
Work Type: Alley Lighting/Lamps
Installations
805 06 0809 / 6995
6222 N CAMPBELL AVE
1.0
01/25/96
01/25/96
0 01/25/96
01/25/96
300
100
805 06 1072 / 7258
6423 N HAMILTON AVE
1.0
06/01/95
06/01/95
0 06/01/95
06/01/95
300
100
300 06 0139 / 5289
6199 N LINCOLN AVE
1,134.0
03/01/06
09/01/06
30,303 05/20/06
06/01/06
34,262
100
302 00 0092 / 5774
6199 N LINCOLN AVE
6.0
0 04/25/01
01/04/02
1,414
100
805 06 1619 / 7805
6500 N WESTERN AVE
1.0
0 09/24/97
09/24/97
300
100
Totals per Alley Lighting/Lamps
Work Type: Arterial Group Relamping 300 06 0238 / 5352
6199 N LINCOLN AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0166 / 5305
6100 N LINCOLN AVE
Work Type: Arterial Strt Lighting/Lamps 300 06 0053 / 5228
6199 N LINCOLN AVE
09/24/97
09/24/97
1,143.0
30,303
36,576
Lamps 1,332.0
06/01/07
12/31/07
39,214 07/31/07
08/18/07
39,214
100
02/21/01
11/01/01
88,237 02/21/01
11/07/01
5,584
100
0 04/07/02
04/10/02
22,341
100
Blocks 1.0
Installations 1,227.0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 531
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Lighting Imprvmnts 300 09 / 33116
ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE
Work Type: Lighting Imprvmnts 300 06 0282 / 5390
W PETERSON AVE AND N RICHMOND ST
Work Type: Ornamental - Piggyback Lighting
Installations 18.0
02/01/08
12/31/08
10/06/04
10/31/04
18,000 06/06/08
07/11/08
16,000
100
0
0
100
Projects .0
0
Fixtures
300 09 / 33116
ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD
27.0
06/23/08
07/11/08
36,990 07/22/08
08/11/08
40,000
300 09 / 33116
ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE
6.0
05/12/08
06/27/08
8,220 07/18/08
08/11/08
9,000
100
300 09 / 33116
ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE
18.0
07/01/08
07/11/08
24,300 07/11/08
08/11/08
18,826
100
Totals per Ornamental - Piggyback Lighting
Work Type: Ornamental Lighting
51.0
69,510
67,826
Blocks
300 09 / 33116
ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
Totals per Ornamental Lighting
Work Type: Residential Regrouping 300 06 0270 / 5378
6199 N LINCOLN AVE
Totals per Lighting/Electrical
.0
0
0
0
0
6,196,177
1,445,792
Lamps .0
03/01/08
12/01/08
0
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 532
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33116
ON N ALBANY AVE FROM W ALBION AVE TO W DEVON AVE
2.0
300 09 / 33116
ON N ALBANY AVE FROM W DEVON AVE TO W ALBION AVE
1.0
300 09 / 33116
ON N ALBANY AVE FROM W DEVON AVE TO W PETERSON AVE
.0
300 09 / 33116
ON N ALBANY AVE FROM W PETERSON AVE TO W DEVON AVE
1.0
300 09 / 33116
ON N BELL AVE FROM W GRANVILLE AVE TO W DEVON AVE
300 11 / 32239
02/01/08
02/01/08
12/31/08
12/31/08
130,000 04/01/08
12/01/08
0
100
130,000 04/01/08
12/01/08
0
0
0 04/01/08
12/01/08
0
0
184,000 04/01/08
12/01/08
0
0
0 04/01/08
12/01/08
0
0
0
0
.0
02/01/08
12/31/08
2.0
03/01/07
12/31/07
300 09 / 33116
ON N CENTRAL PARK AVE FROM W GRANVILLE AVE TO W PETERSON AVE ON N FRANCISCO AVE FROM W DEVON AVE TO W PETERSON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N FRANCISCO AVE FROM W DEVON AVE TO W PRATT BLVD
4.0
04/09/08
05/19/08
260,000 04/01/08
12/01/08
0
100
300 09 / 33116
ON N FRANCISCO AVE FROM W PETERSON AVE TO W DEVON AVE
1.0
285,000 04/01/08
12/01/08
0
0
300 06 / 32275
ON N FRANCISCO AVE FROM W PETERSON AVE TO W GRANVILLE AVE
.0
04/01/07
12/31/07
151,760 04/06/07
08/03/07
90,228
100
300 09 / 33116
ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N LEAVITT ST FROM W GRANVILLE AVE TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N MOZART ST FROM W DEVON AVE TO W PETERSON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N MOZART ST FROM W DEVON AVE TO W PRATT BLVD
4.0
04/05/08
05/19/08
260,000 04/01/08
12/01/08
0
100
300 09 / 33116
ON N MOZART ST FROM W PETERSON AVE TO W DEVON AVE
1.0
285,000 04/01/08
12/01/08
0
0
300 09 / 33116
ON N MOZART ST FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N RICHMOND ST FROM W DEVON AVE TO W PETERSON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N RICHMOND ST FROM W DEVON AVE TO W PRATT BLVD
4.0
04/10/08
05/19/08
260,000 04/01/08
12/01/08
0
100
300 09 / 33116
ON N RICHMOND ST FROM W PETERSON AVE TO W DEVON AVE
1.0
285,000 04/01/08
12/01/08
0
0
300 09 / 33116
ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N SACRAMENTO AVE FROM W ARTHUR AVE TO W PRATT BLVD
1.0
193,600 04/01/08
12/01/08
0
0
300 09 / 33116
ON N SACRAMENTO AVE FROM W DEVON AVE TO W ARTHUR AVE
1.0
0
300 09 / 33116
ON N SACRAMENTO AVE FROM W DEVON AVE TO W PETERSON AVE
300 09 / 33116
.0
110,000
66,400 04/01/08
12/01/08
0
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
ON N SACRAMENTO AVE FROM W DEVON AVE TO W PRATT BLVD
1.0
02/01/08
12/31/08
296,573 04/01/08
12/01/08
0
100
300 09 / 33116
ON N SACRAMENTO AVE FROM W PETERSON AVE TO W DEVON AVE
1.0
285,000 04/01/08
12/01/08
0
0
300 06 / 32277
ON N SACRAMENTO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
05/04/08
12/31/08
0
300 06 0298 / 5405
ON N TALMAN AVE FROM W PETERSON AVE TO W GRANVILLE AVE
2.0
06/15/05
07/15/05
0 06/15/05
300 09 / 33116
ON N TROY ST FROM N LINCOLN AVE TO W DEVON AVE
1.0
300 09 / 33116
ON N TROY ST FROM W ALBION AVE TO W DEVON AVE
2.0
02/01/08
12/31/08
300 06 0308 / 5414
ON N WASHTENAW AVE FROM W PETERSON AVE TO W GRANVILLE AVE
2.0
04/17/06
300 07 0040 / 5463
ON N WHIPPLE ST FROM N LINCOLN AVE TO W HOOD AVE
.50
07/17/06
0
0
08/12/05
100,795
100
184,000 04/01/08
12/01/08
0
0
130,000 04/01/08
12/01/08
0
100
06/01/06
141,265 04/12/06
06/09/06
99,063
100
09/08/06
42,500 08/14/06
10/13/06
38,578
100
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 533
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Lighting/Electrical Work Type: Residntl Staggered Lighting
Blocks
300 09 / 33116
ON N WHIPPLE ST FROM W DEVON AVE TO W PETERSON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N WHIPPLE ST FROM W DEVON AVE TO W PRATT BLVD
4.0
04/15/08
05/06/08
260,000 04/01/08
12/01/08
0
100
300 09 / 33116
ON N WHIPPLE ST FROM W PETERSON AVE TO W DEVON AVE
1.0
184,000 04/01/08
12/01/08
0
0
300 09 / 33116
ON N WHIPPLE ST FROM W PRATT BLVD TO W DEVON AVE
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON W DEVON AVE FROM N ALBANY AVE TO N TROY ST
130,000 04/01/08
12/01/08
0
0
300 09 / 33116
ON W GRANVILLE AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE
.0
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON W GRANVILLE AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE
1.0
184,000 04/01/08
12/01/08
0
0
300 09 / 33116
ON W HOOD AVE FROM N KEDZIE AVE TO N SACRAMENTO AVE
.0
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON W HOOD AVE FROM N SACRAMENTO AVE TO N KEDZIE AVE
1.0
184,000 04/01/08
12/01/08
0
0
Totals per Residntl Staggered Lighting
Work Type: Residntl Strt Lighting/Lamps 300 06 0235 / 5349
ON N DAMEN AVE FROM W DEVON AVE TO W ALBION AVE
Work Type: Strt Light Pole Painting
.0 1.0
02/01/08
02/01/08
12/31/08
12/31/08
40.50
4,622,098
328,664
Blocks 2.0
05/01/03
07/01/03
161,203 04/23/03
07/08/03
148,028
100
100
Locations
300 09 / 33116
ON N CALIFORNIA AVE FROM W DEVON AVE TO W PRATT BLVD
27.0
05/05/08
05/23/08
10,260 05/01/08
05/16/08
5,400
300 09 / 33116
ON N FRANCISCO AVE FROM W PRATT BLVD TO W DEVON AVE
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
300 09 / 33116
ON N KEDZIE AVE FROM W ARTHUR AVE TO W ALBION AVE
6.0
05/12/08
06/27/08
2,280 05/12/08
05/23/08
1,200
100
300 09 / 33116
ON N RICHMOND ST FROM W PRATT BLVD TO W DEVON AVE
300 09 / 33116
ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE
302 00 0076 / 5764 300 03 0050 / 4921 300 03 0040 / 4911
.0
02/01/08
12/31/08
0 04/01/08
12/01/08
0
0
18.0
05/05/08
06/27/08
5,400 05/05/08
05/16/08
3,600
100
ON W PETERSON AVE FROM N KIMBALL AVE TO N PULASKI RD
23.50
04/11/98
04/17/98
0 04/11/98
04/17/98
400
100
ON W PETERSON AVE FROM N LAWNDALE AVE TO N CAMPBELL AVE
49.44
10/01/04
10/20/04
13,992 07/10/04
08/27/04
13,809
100
ON W PETERSON AVE FROM N LINCOLN AVE TO N CLARK ST
37.05
05/10/04
09/10/04
9,101 05/10/04
08/01/04
10,004
100
Totals per Strt Light Pole Painting
160.99
41,033
34,412
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 534
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
% Cmplt
Phase: Construction Work Category: Lighting/Electrical Work Type: Strt Lighting
Blocks
300 06 0246 / 5356
ON N BELL AVE FROM W MORSE AVE TO W FARWELL AVE
.50
09/01/04
12/01/04
54,000 05/19/05
10/03/05
66,733
100
300 06 0246 / 5356
ON N HAMILTON AVE FROM W MORSE AVE TO W PRATT BLVD
1.0
09/01/04
12/01/04
108,000 05/20/05
10/03/05
66,733
100
300 06 0246 / 5356
ON N OAKLEY AVE FROM W PRATT BLVD TO W MORSE AVE
1.0
09/01/04
12/31/04
108,000 06/14/05
10/13/05
66,733
100
300 06 0246 / 5356
ON N SEELEY AVE FROM W FARWELL AVE TO W PRATT BLVD
.50
09/01/04
12/01/04
54,000 06/12/05
09/23/05
66,733
100
300 06 0246 / 5356
ON N WASHTENAW AVE FROM W SHERWIN AVE TO W TOUHY AVE
1.50
09/01/04
12/01/04
108,000 06/17/05
09/23/05
66,733
100
300 06 0246 / 5356
ON W COLUMBIA AVE FROM N DAMEN AVE TO N SEELEY AVE
.50
08/01/04
12/01/04
108,000 06/17/05
10/13/05
66,733
100
300 03 0050 / 4921
ON W DEVON AVE FROM N KEDZIE AVE TO N LINCOLN AVE
01/15/05
06/15/05
520,000 01/17/05
06/17/05
251,730
100
5.0
Totals per Strt Lighting
Work Type: Traffic Signal Regrouping
1,140.0
Work Type: Underpass Lighting
Fixtures
300 06 0217 / 5337
6199 N LINCOLN AVE
805 06 2704 / 8890
1780 W DEVON AVE
Totals per Underpass Lighting
652,128
Lamps
6199 N LINCOLN AVE
300 06 0139 / 5289
1,060,000
03/01/04
12/01/04
5,928 11/07/06
11/08/06
12,414
100
42.0
08/10/04
08/13/04
2,361 08/10/04
09/13/04
26,448
100
14.0
07/20/94
07/20/94
0 07/20/94
07/20/94
10,500
100
56.0
2,361
36,948
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 535
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
% Cmplt
Cost
Phase: Construction Work Category: Traffic Work Type: LED Signal Head Install
Locations
210 06 0130 / 4389
N CALIFORNIA AVE AND W TOUHY AVE
1.0
0 03/21/02
03/21/02
8,539
90
210 06 0130 / 4389
N WESTERN AVE AND W ALBION AVE
1.0
0 05/14/02
05/14/02
1,850
100
210 06 0219 / 4459
N WESTERN AVE AND W ALBION AVE
1.0
04/29/05
04/29/05
10,563 04/23/05
04/23/05
8,007
100
210 06 0219 / 4459
N WESTERN AVE AND W DEVON AVE
1.0
04/26/05
04/27/05
10,563 04/09/05
04/09/05
8,007
100
210 06 0219 / 4459
N WESTERN AVE AND W GRANVILLE AVE
1.0
04/10/05
04/10/05
10,563 04/05/05
04/05/05
8,008
100
210 06 0219 / 4459
N WESTERN AVE AND W HOWARD ST
.50
05/03/05
05/04/05
5,282 04/21/05
04/21/05
5,042
100
210 06 0219 / 4459
N WESTERN AVE AND W LUNT AVE
1.0
04/28/05
04/29/05
10,563 03/02/05
03/02/05
8,008
100
210 06 0130 / 4389
N WESTERN AVE AND W PRATT AVE
1.0
0 04/24/02
04/24/02
10,074
100
210 06 0219 / 4459
N WESTERN AVE AND W TOUHY AVE
.50
5,282 03/11/05
03/11/05
5,042
100
Totals per LED Signal Head Install
Work Type: Left Turn Arrow
04/29/05
04/30/05
8.0
52,815
62,577
Locations
210 06 0231 / 4470
N CALIFORNIA AVE AND W PETERSON AVE
.0
03/01/08
12/01/08
98,116
0
0
210 06 / 32040
W DEVON AVE AND N WESTERN AVE
1.0
11/01/06
12/31/07
85,000 09/17/07
12/15/07
36,089
70
210 06 0158 / 5058
W PETERSON AVE AND N KIMBALL AVE
.50
06/02/06
02/19/07
30,000 06/22/06
03/02/07
33,249
100
Totals per Left Turn Arrow
Work Type: Removal Temp Wiring - Signals 300 06 0197 / 5322
N LEAVITT ST AND W DEVON AVE
Work Type: Signals 300 06 0096 / 5258
6199 N LINCOLN AVE
Work Type: TSM Install
1.50
213,116
69,338
Crossings 1.0
4,000 04/08/02
04/08/02
0
100
Intersections 29.0
11/25/03
12/01/03
0 09/16/03
09/22/03
4,585
100
Locations
814 06 0141 / 16355
6400 N CALIFORNIA AVE
1.0
07/22/93
07/22/93
0 07/22/93
07/22/93
109,947
100
814 06 0354 / 16551
7199 N KEDZIE AVE
1.0
01/01/96
01/01/96
0 01/01/96
12/31/97
175,000
100
814 06 0195 / 16407
7599 N KEDZIE AVE
1.0
04/09/96
04/09/96
0 04/09/96
04/09/96
150,000
100
814 06 0271 / 16483
6600 N WESTERN AVE
1.0
04/25/89
04/25/89
0 04/25/89
04/25/89
90,000
100
814 06 0357 / 16552
7000 N WESTERN AVE
1.0
10/11/90
10/11/90
0 10/11/90
10/11/90
86,982
100
814 06 0111 / 16326
7400 N WESTERN AVE
1.0
09/18/90
09/18/90
0 09/18/90
09/18/90
86,982
100
Totals per TSM Install
6.0
0
698,911
CPMR055
C apital P rogram M anagement
Projects By Ward, Phase, Work Category, Work Type
05-08-09 03:47 PM Page 536
1/1/2008 AND 12/31/2008
Ward 50 Bernard L. Stone CIP/CPM Number
Street Address
No of Units
Start
WIP Estimate End
Cost
Start
WIP Actual (to Date) End
Cost
Phase: Construction Work Category: Traffic Totals per Traffic
269,931
835,411
Totals per Construction Phase
6,466,108
2,281,203
Totals for Ward 50
6,475,508
2,288,267
175,941,558
169,885,440
Totals for Report
% Cmplt
C apital P rogram M anagement CPMR055 End of Report