H3I CR MOP Format V1.6

H3I SPECIFIC MOP H3I_CR MOP_RNC_SAMARINDA_RNC BALIKPAPAN_Neighbor Audit_20160412_R4

PREPARED BY:

Novi

DATE:

REVIEWED BY:

DATE:

APPROVED BY:

DATE:

13 April 2016

This document is exclusively property of HUAWEI Technologies. Co., Ltd. and shall not be used copied or communicated to the third party without its prior authorization.

H3I CR MOP Format V1.6

Contents 1

2

3

4

Description of Change 1.1 Description of Site 1.2 Purpose 1.3 Description of Change and Change Influence Preparations for Change 2.1 Change Period 2.2 Composition of Change Team and Responsibility of Team Members 2.2.1 Change Team of Customer 2.2.2 Huawei On-site Change Team 2.2.3 Huawei Support & Guarantee Team 2.3 Check of Equipment Running 2.4 Change Risks and Countermeasures 2.5 Check Before Change Operation Steps for Change 3.1 Change Steps 3.1.1 Overall Description 3.1.2 Operation Steps for Change 3.2 Test and Verification 3.3 Solution for Change back In the Case of Failure 3.3.1 Definition of Change Failure 3.3.2 Overall Description of Changeback 3.3.3 Information Collection Before Changeback 3.3.4 Changeback Steps 3.3.5 Equipment Status Check 3.3.6 Tests After Changeback 3.3.7 Changeback Risk Analysis 3.4 Change of Spare Parts and Emergency Workstation Work After Change 4.1 Observation 4.2 Provision of Materials 4.3 Provision of Software 4.4 Training 4.5 Matters Needing Attention

Page 2 of 9

H3I CR MOP Format V1.6

1 Description of Change 1.1

Description of CR

1.2

Purpose

This CR to reduce Power congestion

1.3

Description of Change and Change Influence

2 Preparations for Change 2.1

Change Period

The change period is from 2016/06/04 (Each batch change operation will follow below steps) No.

Action

Time

1

CR Registered to OSS

13 April 2016

2 3 4 5 6

2.2 Composition of Change Team and Responsibility of Team Members

2.2.1 Change Team of Customer Name

Responsibility

Telephone No.

1

Mimit

08993933003

2

Novi Budi Widiana

089639427682

Page 3 of 9

H3I CR MOP Format V1.6

2.2.2 Huawei On-site Change Team

Position

Name

Site

Company

Phone

Responsibility

Supervisor

name

PIC

Mario

Supervisor Phone

089690200444

G1

On site

Novi Budi

089639427682

Widiana

Engineer

MS

Supervisor

Novi

Vendor

Budi

Huawei

Escalation/Compain

08991549091

Handling

Widiana

2.2.3 Huawei Support & Guarantee Team Name

2.3

Responsibility

Telephone No.

Check of Equipment Running

2.4 Change Risks and Countermeasures No.

Risk Description

Possibility

Impact

(High/Middl

(High/Mi

e/Low)

ddle/Low

Countermeasure

Page 4 of 9

H3I CR MOP Format V1.6

) main KPI counter

low

low

1 degraded 2 3 4 5 6

2.5

Check Before Change

No.

Preparations Before Change

1

RNC,NODEB

Owner

Completion Date 13 April 2016

2 3 4

3 Operation Steps for Change 3.1

Change Steps

3.1.1Overall Description

H3I_CR MOP_RNC_SAMARINDA_RNC BALIKPAPAN_Neighbor Audit_20160412_R4.xlsx

Page 5 of 9

H3I CR MOP Format V1.6

3.1.2Operation Steps for Change (For specific operation steps, follow related product upgrade guides document.) No.

Change Step

1

Check RNC

2

Running CR

Operation

Implementation Person

Time

under RNC BALIKAPAPAN & SAMARINDA 3

Running CR under RNC

5

Running CR under RNC

6

Roll Back in case

Rollback to earlier CR of abnormal

3.2

Test and Verification

Describe in details how the test is conducted, specify the owner of each test item and test items, record detailed test processes . 1.

No.

1

Monitoring KPI

Operation Item

Operation Method

Owner

Time

RNO Team

13 to 18 APRIL

Check Basic Services

2

Alarm compare

3

Check

(Notice: main KPI need to check,

Performance

CS/PS KPI need to check.)

2016

Page 6 of 9

H3I CR MOP Format V1.6

3.3

Solution for Change back In the Case of Failure

3.3.1Definition of Change Failure A change failure shall be recognized if the following major problems cannot be resolved. (within the stipulated period of time) and back-off operations shall be finished. (1) Have additional alarm after (2) Hardware failures (3) Frequent breakdown (4) Main KPI degrade very badly

3.3.2 Overall Description of Changeback

H3I_CR MOP_RNC_SAMARINDA_RNC BALIKPAPAN_Neighbor Audit_20160412_R4.xlsx

3.3.3 Information Collection Before Changeback Collect Main KPI and check Main KPI

3.3.4Changeback Steps 3.3.5Equipment Status Check 3.3.63.3.6 Tests after Change back 3.3.7 Changeback Risk Analysis Page 7 of 9

H3I CR MOP Format V1.6

3.4

Change of Spare Parts and Emergency Workstation For MS PIC: Novi Budi Widiana For RO PIC: Transmission Spare Part Team PIC: Wireless Spare Part Team PIC: Datacomm Spare Part Team PIC: Core Spare Part Team PIC: VAS & OSS/IT Spare Part Team PIC:

4 Work After Change 4.1 No.

Observation

Main Task

Responsibility

KPI monitoring after CR implemented

RNO team

1

Time 13 to 18 APRIL 2016

2 3

4.2

Provision of Materials

Version Release Documents Version Reference Product document Software version upgrade service report

4.3

Provision of Software

N/A

Page 8 of 9

H3I CR MOP Format V1.6

4.4

Training

4.5

Matters Needing Attention

N/A

Page 9 of 9