Jj Flyover

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Jj Flyover as PDF for free.

More details

  • Words: 156
  • Pages: 1
Paltan Road Viaduct

India

Client

Main Features

Maharashtra State Road Development Corporation Ltd. (MSRDC)

The first major urban viaduct for Mumbai, the Paltan Road Viaduct is a 16.2-m dual carriageway, 2 km in length, designed to ease congestion along one of the City’s busiest traffic corridors.

Services Provided 

Design



Construction technology



Supervision of construction

Dates

1997 - 2002 Project Data 

Elevated viaduct, 2-km in length



Construction cost: US$ 55 million

The viaduct has a precast central trapezoidal spine with precast side frame cantilevers stitched and transversally prestressed with the spine. The spines are match-cast and erected using an underslung launching girder, upon which line and levelling are carried out prior to gluing and prestressing. The side cantilevers are erected from the completed spine by the use of an overhead hanger system. The shaped piers and deck soffit are cast with a fine fluting creating an overall appearance of harmony and elegance.

Related Documents

Jj Flyover
June 2020 7
Flyover
April 2020 4
Panipat Flyover
June 2020 1
Banglore Flyover
June 2020 4
Jj
November 2019 25
Jj
November 2019 26