Panasonic Basic Installation Guide
For Equipment Engineers
Presented by: SMT Indian engg
Contents Facility Requirements Machine setup Power Supply Air Supply LAN Setup PATLITE Setup
Facility Requirement Machine should be placed on the horizontal places Conditions
Temperature 10ºC-35ºC (~1ºC) Humidity 25%-60%
Secure enough space for maintenance
Machine setup Tools:
Fork lift Plumb Crow bar Measuring Tape Level ruler Spanner
Machine setup Draw a line (keep mark) Move the machine at marked location Keep fixed conveyer of m/c and drawn line at same line Measure height b/w conveyer and floor
Machine setup Fix the screw at bottom of m/c 4 corner + 2 middle screw Connect air supply-0.5Mpa Connect the power supply 3 phase 200V,50/60Hz Connect 3 exhaust air connection 5.5-6.5m^3/min
Power Supply Supply Power:
200VAC ± 10V or 400VAC ± 10V
Frequency:
50/60 Hz ± 5%
Rated Capacity:
2.5 kVA
Power Supply Installation Procedure:
Open the panel on the right side of the machine Pass the cable through the cable clamp and secure it by rotating clockwise Connect the cable with the main power terminal
Connecting pin: Weidmuller H4/20D or H6/20 Connection order: PEL1L2L3 Tightening torque: 0.8~1.6 Nm
Air Supply Supply compressed air to A (in diagram) Air pressure: 0.49~0.78MPa Adjust to: 0.49~0.54MPa using the regulator Air supply: Min. 150L/min (8L/min more for every bulk feeder)
LAN Setup
LAN Setup Connect Ethernet cable to HUB in the machine and with the line computer (PT installed)
PATLITE Setup Insert the plug into the socket on the main machine and fix it with a clasp