INSPECTION CALL PROJECT TITLE: 32 MW Shahi Export SPV Project at Siruguppa, Bellary Karnataka CLIENT: TATA POWER SOLAR SYSTEMS LTD. P.O. NUMBER / DATE: 5000020994 Dated 24-01-2018 CALL REFERNCE NO: 05 DOCUMETS FOR REFERNCE: 1. DRAWING NO: TPS053-CV-204A 2. INPROCESS INTERNAL INSPECTION REPORT – ROLL FORMING 3. INPROCESS INTERNAL INSPECTION REPORT – PUNCHING 4. MTC’s MATERIAL DETAILS: Sr. No. ITEM DESCRIPTION QUANTITY P1 Front Leg 174 Pcs 1 80x40x13x1.6x2250 mm long 2

P2 Back Leg 80x40x13x1.6x3320

DATE: 28-03-2018

174 Pcs

WEIGHT 0.85 MT

1.24 MT

VENDORS DETAILS:

VENDOR ADDRESS:

PLACE OF INSPECTION ADDRESS:

PURSHOTAM PROFILES PVT. LTD.

PRABH DAYAL OM PARKASH INFRASTRUCTURE PVT. LTD.

108, Prakash Industrial Area, Opp. Aradhna Cinema City Tower, Uttar Pradesh

C - Bay, POSCO India Chennai Steel Processing Centre Pvt. Ltd, Plot No. E-564, Sanand Engineering Estate, GIDC, Sanand, Ahmedabad, Gujarat

INSPECTION ACTIVITIES: 1. STAGE: 2. FINAL: FINAL INSPECTION DATE OF INSPECTION: 29-03-2018

CALL RAISED BY: DEEPAK DASS CONTACT NO. 8511726466

APPROVED BY : BIJENDRA UPADHAYAY

INSPECTION CALL

Related Documents

Inspection Call Letter.docx
November 2019 26
Inspection
April 2020 25
Inspection
June 2020 24
Inspection
April 2020 28
Call
November 2019 83

More Documents from ""

Lab Test Letter.docx
November 2019 20
Inspection Call Letter.docx
November 2019 26
Service Sector
July 2020 15
Consumer Behaviour
June 2020 19
Service Sector
June 2020 20