Iemfaculty

  • Uploaded by: sandeep
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Iemfaculty as PDF for free.

More details

  • Words: 241
  • Pages: 1
1

Mrs. sandeepker

Name

:

02

Date of Birth & Age

:

24th May 1980 ; 27

03

Educational Qualifications (High School to Highest Qualification)

:

M. Tech – Computer Integrated Manufacturing

Designation

:

Senior Lecturer

Sl. N o

Qualification

a.

AISLC

b.

HSC

c.

B.E

d.

M.Tech

Board/IIT/NIT/ University/Others

Institute & Place of Study

Anglo Indian Board

Holy Cross Anglo Indian Girls’ Higher Secondary School, Tuticorin Victoria Girls’ Higher Secondary School, Tuticorin Karunya Institute of Technology, Comibatore. Madan Mohan Malaviya Engineering College

TamilNadu State Board Bharathiyar University, Coimbatore U.P. Technical University, Lucknow

Area of Specialization

Year of Passing 1995

Mathematics, Biology, Physics & Chemistry

1997

Production Egineering

2001

Computer Integrated Manufacturing

2003

CEP – Continuing Programmes, D/OEP: Distant / Online Education Programmes. Please Delete the rows not applicable Researc Teaching Industry Others Total h Work Experience : 04 4.5 Yrs 4.5 Years

05

06

Date of Joining & Years

:

17th March 2008

Area of Specialization

:

Computer Integrated Manufacturing

Subjects teaching at Under Graduate Level / Post Graduate Level U.G Level: CIM, CADA, Simulation, Production Planning and Control, Engineering Theory : Mechanics, Design of Machine Elements, Metrology P.G. Level: CIM, CADA, Product Design and Development Stategies U.G.Level: AutoCAD, PRO-E, Metrology, Special Machines, Metallurgy Practicals : Project Work

07

Production Planning and Control

:

Projects Carried Out

:

Production Planning and Control at MSL, Automation of the tracking process at FORD paint shop. Reduction of Cycle time for drum manufacturing.

Related Documents

Iemfaculty
May 2020 24

More Documents from "sandeep"