Hyper V

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Hyper V as PDF for free.

More details

  • Words: 288
  • Pages: 8
tech-days Session 1 

Government of Alberta - Department of Energy



Robert Burwood



10 December 2008



Planning Physical to Virtual Server Migrations with Microsoft Assessment and Planning Toolkit

Map Tool 

 





Assment tools, used to be Vista readiness tool (free). Agentless tool for servers and desktops. Take inventory – perfmon captures for CPU, RAM, storage and network. 50 Meg download, .Net 3.5 SP1 and SQL express needed. Collecting inventory takes time and uses a setup dialogue.

Running Assesments 



 



Need an inventory, eg. How many servers can run Windows 2008? How to capture, credentials required using wizard. Network impact should be low, using WMI calls. Various assesment senarios including saving power and security assesments!. assesments! Reports by server roles and consolidation options.

Sample Inventory Completed  



Creates excel and word files. Word documents gives you some considerations. Would now capture perfromance metrics.

Demo  



Many wizards for recommendations. Select R2 or Hyper-V target, including processor types (Intel/AMD). How many sockets and cores for target machines.



99% of the resource requirements is RAM.



8-12 ratio for typical 2U server.



Define disk subsystem of target host.

Selecting Candidates 

Import computer names (netBIOS server names).



Creates proposal word document.



And excel reports to validate.



One VM per LUN, many small LUNs used.



Summary Reports help support proposals to virtulize.

Desktop Apps Virtulization  



SoftGrid for desktops. Desktop hardware assement report for App virtulization. Planning tool, with more changes to come soon.

Summary 

Tool is free and should be low network overhead.



Capture in a 24 hour period.



New assements are be added monthly.

Related Documents

Hyper V
November 2019 18
Hyper V Vs Vmware Esx
April 2020 13
Hyper Paysages
June 2020 10
Hyper Ups
October 2019 6