"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

SN 1

Project Description

Information Project Name

Details Chatten-II Small Hydro Power Project (2 x 1500 kW)

Location

Location: Long-88o34’, Lat-27o42’; Nearest railheadNew Jalpaiguri, Nearest airport-Bagdogra, Nearest road –Chungthang-Lachen Highway, Chatten, North District, Sikkim, Map-refer DPR Head-258.74 mts, Design discharge -1.5 cumecs, 1.5-MW; 2 units, 21.30 million units/annum The site was selected by the Energy & Power Deptt, Hydrological and site survey also carried out by the Energy & Power Deptt.

Capacity Site selection

Promoters Details

2

Project

Infrastructural constraints

For CERs calculation If done by self, it will be used to show that high risk is taken hence a supporting argument for additionality of the project

Sikkim Power Development Corporation Limited, National Highway 31-A, Gangtok, Sikkim

When did the project get conceptualized and work begun. Project status - MoU Signed - DPR Ready - Environmental clearances - PPA Signed - Financial Closure - Equipment orders finalized - Construction begun/completed - Generation started Has any reservoir been created Technology

Information Purpose For unique identification of project For unique identification of project

Chronology of events Chronology of events July 2008 September 2007 NA Yes Under process Under Process August 2008/ August 2010 Under construction No reservoir created as trench weir used. Equipment makes- Jyoti India Ltd, type- Pelton turbine, Synchronous Generator, How many such projects nearby- one (Rabomchu HEP) There are no infrastructural constraints as there is

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

These risk factors would be

"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

Barriers

3

Financial Details

existing highway upto the project area as well as existing grid for power evacuation. Risks of nearby projects

There are no projects existing or in pipe line in the same catchment area

Technical difficulties of the project Climatic conditions

Refer DPR Temperature (min-0oC, max-22oC), altitude-2600 mts, rainfall (min-1200 mm, max-1800 mm), snow fall- during winter months. earthquake – Zone IV Financial closure under process. Government of Sikkim.

Difficulties encountered in financing Buyers of electricity Government support- prices, incentives Financial Model (used in the DPR or used for initial management decision to go ahead

4

Sustainable Social Development Indicators

MNRE subsidy- 3.25 Crores, State Govt subsidy-1 Crore Total Project Cost-28.91 Crores , Debt equity ratio 85:15; Debt cost -25 Crores , O&M costs-1.4 Crores/annum, payment terms for electricity- Rs. 3/unit The area is sparsely populated and the major occupation of the inhabitants is farming and related activities. The project area is mainly uninhabited and as such no families are going to be dislodged. The total land required is 7.674 Hectares out of which 5.766 Hectares is private holdings and 1.908 is forest land. However, the land holding is mainly private. The region near the project area has a thriving tourism industry due to its scenic beauty which attracts people from far and wide, thus the power available from the project will be useful for provide uninterrupted power supply to the area.

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

used for establishing additionality of the CDM project.

"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

Further, during the construction as well as on the long run the project is going to provide employment to the local people of the area. The project site is located in the extreme north part of the state having sparse population. However there is deployment of armed forces having power demand. Further there are plans of the Teesta stage I, II, III projects coming up which will need constructional power which can be supplied by the project. Further the project will be grid connected and thus supply to the local needs of the state. Presently the state is buying about 70% of its peak demand and this project will help the state government to be more self-sufficient I terms of power which means more fund available to undertake other development works. Further, there will be local employment of the people from village during construction as well as after the commissioning of the project. Environmental and Ecological issues

Technological Indicator Others

Other documents required

No environmental clearance required for the project. However as the project is of the run-of-the river type no submergence indicated, further a minimum of 10% of the river flow is always maintained for ecological considerations. Compensatory afforestation undertaken. The project implementation will promote new & better technology in projects for future as this will be the first project tendered in Turnkey basis. DPR, forest clearance, PPA, approval of the Board

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

Required to prove that proper procedures have been followed

"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

SN 1

Project Description

Information Project Name

Details Lachung-II Small Hydro Power Project (2 x 1500 kW) Location: Long-30o05’, Lat-79o36’; Nearest railheadNew Jalpaiguri, Nearest airport-Bagdogra, Nearest road –Chungthang-Lachung Highway, Lachung, North District, Sikkim, Map-refer DPR Head-385 mts, Design discharge -1.26 cumecs, 1.5-MW; 2 units, 13.08 million units/annum The site was selected by the Energy & Power Deptt, Hydrological and site survey also carried out by the Energy & Power Deptt.

Location

Capacity Site selection

Promoters Details

2

Project

Infrastructural constraints

For CERs calculation If done by self, it will be used to show that high risk is taken hence a supporting argument for additionality of the project

Sikkim Power Development Corporation Limited, National Highway 31-A, Gangtok, Sikkim

When did the project get conceptualized and work begun. Project status - MoU Signed - Revised DPR Ready - Environmental clearances - PPA Signed - Financial Closure - Equipment orders finalized - Construction begun/completed - Generation started Has any reservoir been created Technology

Information Purpose For unique identification of project For unique identification of project

Chronology of events Chronology of events 2001 March 2003 NA Yes 2003 Erection completed 2001/ August 2008 Under testing No reservoir created as trench weir used. Equipment makes- VaTech Pvt Ltd, type- Pelton turbine, Induction Generator, How many such projects nearby- nil There are no infrastructural constraints as there is

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

These risk factors would be

"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

Barriers

3

Financial Details

existing highway upto the project area as well as existing grid for power evacuation. Risks of nearby projects

There are no projects existing or in pipe line in the same catchment area

Technical difficulties of the project Climatic conditions

Refer DPR Temperature (min:-2oC, max:20oC), altitude-3070 mts, rainfall (min-1200 mm, max-1800 mm), snow fall- during winter months. earthquake – Zone IV Non as only part financing done. Government of Sikkim.

Difficulties encountered in financing Buyers of electricity Government support- prices, incentives Financial Model (used in the DPR or used for initial management decision to go ahead

4

Sustainable Social Development Indicators

MNRE subsidy- 13.5 Crores, State Govt subsidy-4.5 Crore Total Project Cost-30.08 Crores , Debt equity ratio 40:60; Debt cost -12 Crores payment terms for electricity- Rs. 3/unit The area is sparsely populated and the major occupation of the inhabitants is farming and related activities. The project area is mainly uninhabited and as such no families are going to be dislodged. The region near the project area has a thriving tourism industry due to its scenic beauty which attracts people from far and wide, thus the power available from the project will be useful for provide uninterrupted power supply to the area. Further, during the construction as well as on the long run the project is going to provide employment to the

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

used for establishing additionality of the CDM project.

"EMERGENT VENTURES INDIA PVT LTD Sustainable Solutions for the Environment

local people of the area. The project site is located in the extreme north part of the state having sparse population. However there is deployment of armed forces having power demand. Further there are plans of the Teesta stage I, II, III projects coming up which will need constructional power which can be supplied by the project. Further the project will be grid connected and thus supply to the local needs of the state. Presently the state is buying about 70% of its peak demand and this project will help the state government to be more self-sufficient I terms of power which means more fund available to undertake other development works. Further, there will be local employment of the people from village during construction as well as after the commissioning of the project. Environmental and Ecological issues

Technological Indicator Others

Other documents required

No environmental clearance required for the project. However as the project is of the run-of-the river type no submergence indicated, further a minimum of 10% of the river flow is always maintained for ecological considerations. Compensatory afforestation undertaken. The project implementation will promote new & better technology in projects for future as this will be the first project in Sikkim having SCADA system. DPR, forest clearance, PPA, approval of the Board

Contact: Atul Sanghal Cell: 9717396309, email: [email protected] Web-site: www.emergent-ventures.com

Required to prove that proper procedures have been followed