INTEGRATED POWER DEVELOPMENT SCHEME (IPDS)
State
Himachal Pradesh Himachal Pradesh State Electricity Board Ltd
Name of Govt Utility Implementing Project Name of the Project Area (Circle/ Zone/ Utility)
Operation Circle, Solan
Detail Project Report Strengthening of sub-transmission & distribution network including metering
Ref no. of DPR
HPSEBL/IPDSDPR/Solan Circle
Submitted to
POWER FINANCE CORPORATION LTD.
Date of Submission 30/06/2015
POWER FINANCE CORPORATION LTD. Detail Project Report Index S. Table of Contents N0. 1 Input Data for Detailed Project Report 2 Guidelines for DPR Preparation & Implementation
Page Number 1 2-3
3 Declaration
4
4 Executive Summary
5
5 Background
6
6 Volume I: Project Area Details
7
7 Volume IIa: SUMMARY Project Cost
8
8 Estimated Project Cost - Bill of Quantities 9 Cost Benefit 10 Project area asset detail 11 Annexures
9-49 (50) Annexure-1 (51-57) Annexure-2 58-70
POWER FINANCE CORPORATION LTD. Detail Project Report INPUT DATA
Utility Details Name of State
Himachal Pradesh
Name of Govt Utility Implementing Project (Expanded Name)
Himachal Pradesh State Electricity Board Ltd.
Name of Govt Utility Implementing Project (Short Name)
HPSEB Ltd
Name of Pvt/Distribution Franchisee (in case of Pvt/DF/ Cooperative Society) Contact Details of Nodal Officer (Govt Utility Implementing Project) Name Designation Address Phone Office Mobile No. Fax E-mail Utility level AT&C loss AT&C loss as provided by PFC in latest “Report on Performance of State Power Utilities”
Er. Rajiv Awasthi Chief Engineer (SP) Vidyut Bhawan, HPSEBL, Shimla 0177-2657901 +91-9418069834 0177-2653656
[email protected]
Unit
AT&C Loss for FY 2012-13
%
9.53%
Project Area Details Name of the Project Area Circle/ Zone/ Utility)
Operation Circle, Solan
Nos. of towns covered
8
Total Population of all towns covered in project area
169263
Nos. of Consumers in all towns covered in the project area
101128
Contact Details of Project Area Incharge (Govt/Govt Authorised Agency) Name Er. Deeraj Mittal Designation Superintending Engineer (OP) Address HPSEBL (Op) Circle Solan Phone Office Mobile No. Fax E-mail Data for AT&C Losses Computation for Project Area (All statutory towns of the Circle/ Zone/ Utility) Energy Input Energy Sales Total Revenue Billed Total Revenue Collected (excluding arrears) Billing Efficiency Collection Efficiency AT&C Losses
01792-221481 94180-32201 01792-223652
[email protected]
Unit
Data for Previous FY 2013-14
M Units M Units Rs. Lac Rs. Lac % % %
188.17 175.93 6256.36 6118.02 93.50% 97.79% 8.57%
Dedicated team: HQ Level Name & Designation Er. Rajesh Singh, Chief Engineer (Operation), South Zone, Dharamshala Er.Rajiv Awasthi, Chief Engineer (System Planning), Vidyut Bhawan, Shimla Er. R.K. Pathania, Superintending Engineer (RGGVY), Khalini, Shimla
Field Level Name, Designation & Area Er. Deeraj Mittal, Superintending Engineer Er. Dinesh Kumar Gupta, Addl. SE (ED) Nalagarh Er. Rajiv Sood, Addl. SE (ED) Baddi Er. S.K. Sen, Addl. SE (ED) Solan Er. K.K. Bassi, Sr. Executive Engineer (ED) Arki Er. Anil Sehgal, Sr. Executive Engineer (ED) Parwanoo
Date of Submission of Proposal DPR Ref No. Proposed Project Start Date Proposed Month of Completion
Date No. Month-Year Month-Year
30/06/2015 HPSEBL/IPDSDPR/Solan Circle 21.03.2016 20.09.2018
POWER FINANCE CORPORATION LTD. Detail Project Report Guidelines for DPR Preparation & Implementation The DPR shall be prepared, base on IPDS guidelines as issued from MoP, GoI. Some salient features of IPDS guidelines & additional guidelines for DPR preparation is mentioned below. In case of any mis-match between IPDS guideline issued from MoP &DPR guideline as mentioned below, the IPDS guideline as issued from MoP, GoI shall prevail. 1
DPR is to be prepared based on the broad scope of work validated by Nodal agency at 1st Stage during discussion with utility on NAD, on detailed field survey and latest approved schedule of rates for various items of work. The DPRs shall be duly recommended by the Distribution Reforms Committee (DRC) at the State level. The Nodal Agency will separately provide comparable costs sourced from CPSUs for major equipment for reference of the utility. These reference rates shall be used as ceiling rates for sanctioning of the projects
2 The DPR under the scheme has been formulated for urban areas (Statutory Towns) only 3
In case of private sector Discoms where the distribution of power supply in urban areas is with them, projects under the scheme will be implemented through a concerned State Government Agency and the assets to be created under the scheme will be owned by the State Government / State owned companies. The areas under franchisee shall be covered under the scheme subject to compliance with the terms & conditions of their respective agreements and Cooperative Societies shall also be eligible, but they would be required to submit Audited statements annually regarding the utilization under the approved project through State Cooperative Department and the concerned Discom. Further, all the projects need to be recommended by the State Level DRC.
4 In case of private sector Discoms/Distribution Franchisee/Co-operative Societies, the DPR shall be submitted to PFC by
its State Govt Agency. 5 The circle/zone/Utility wise DPRs shall be prepared by the utility and recommended by Distribution Reforms Committee
(DRC) at State level. To avoid duplication of works with scope already sanctioned under RAPDRP scheme, Utility shall indicate the additional work component proposed under IPDS DPRs with comparative BOQ for such R-APDRP project area.
6 BoQ for R-APDRP towns in the project area to be filled in Sheet Vol II.b and BoQ for non-RAPDRP towns to be filled in
sheet Vol II.c. 7 For ERP & IT component a separate consolidated DPR shall be prepared by respective state. 8 For linking of all 33 KV or 66 KV grid substations/billing offices/Regional/Circle/Zonal offices of Discoms with
optic fiber network of NOFNA, a separate and consolidated DPR shall be prepared by the respective utility in consultation with BBNL or any designated agency like BSNL, RailTel, PGCIL etc.
9 The projects shall be implemented on turn-key basis. However, in exceptional circumstances, execution on partial
turnkey/departmental basis (to be proposed by utility along with respective DPR duly recommended by DRC) shall be permitted with the approval of the Monitoring Committee.
10 In either mode of implementation (turnkey/partial turnkey/departmental), the maximum time limit for completion of the
project viz award and implementation shall not be beyond thirty months from date of communication of the approval of the Monitoring committee. 11 An appropriate Project Management Agency (PMA) will be appointed preferably utility-wise to assist them in project
management ensuring timely implementation of the project.
12 The work(s) already executed/to be executed under R-APDRP/NEF/GOI other scheme, etc is/are not eligible under IPDS. 13 The works proposed in the DPR shall aim for meeting utility level AT&C loss reduction trajectory as finalised by MoP in
consultation of state utilities (The committed AT&C loss reduction trajectory is given in Annexure-I)
14 Utility to ensure installation of bounadry meters for ring fencing of Non-RAPDRP Towns having population more than
5000. 15
16
The Utility will have to certify that the DPR is in line with guidlines issued by Ministry of Power/ PFC for IPDS & DRC clearance has been obtained, before the same is forwarded to PFC for consideration of sanction. Utility shall ensure timely availability of any other infrastructure or facilities that are essential for implementation of IPDS works but are not in the scope of Contractor viz. land acqusition, RoW, pole location etc.
17 Utility shall provide detailed informantion regarding exisitng infrastrucuture, any bottleneck in implementation of the works
and the works proposed in the project to the Contractor before award of contract. 18 The cost estimates should not include any departmental overhead expenses. All such expenditures should be borne by
the utility.
19 No cost escalation shall be admissible for the schemes sanctioned under IPDS. Any additional cost on any account
whatsoever to complete the project shall be borne by utility.
20 Distribution Transformers procured under IPDS scheme, shall have efficiency level equivalent / better than that of three
star ratings of BEE, where ever BEE standard is applicable. For other DTs, where, BEE standard is not applicable, CEA guidelines shall be followed (available on CEA web site).
21
AMI, Smart meters can be considered for deployment in the towns where SCADA has been/being established under RAPDRP.
22 For Solar Panels - only cost of Solar panels with support structure and Net-meters shall be permissible under IPDS. Utility
shall bear cost of associated items.
23 Additional Guideline for DPR preparation a
Load growth of 05 year in case of HT system & 03 years in case of LT system to be considered for proposing the DPR.
b For replacement of existing HT & LTCT Electromechanical consumer meters (AMR compatible, open protocol) tamper proof electronic metersand replacement of whole current electromechanical consumer meters, the guidelines of CEA shall be adopted. c Service line for new consumers is not eligible in the scheme. In case of installation of meter pillar box or if existing service line is prone to tamper and pilferage the same shall be replaced with armored or XLPE cable for which minimum configuration should be : (i) Single Phase consumers: min. 4 sq.mm (ii) Three Phase consumers: min. 6 sq.mm d Installation of new Distribution Transformers in following cases: (i) If the length of LT feeder is more than 300 mtr then new Distribution transformer may be proposed to improve HT: LT ratio. (ii) If existing peak load on DT is more than 70% of its rated capacity then new DT may be proposed. (iii) Even if the length of LT feeder is below 300 meter but the peak load on the feeder is more than 70% of rated thermal capacity of the conductor, new DT should be installed or conductor should be replaced by higher size. e Provision of Isolator, HT fuse / horn gap & LA at each Distribution Transformer, if not provided earlier. Alternatively this isolator, HT fuse / horn gap fuse can be replaced with drop out fuse with On Load maintenance facility thereby reducing system interruptions. f Provision of LT distribution box for control and protection of outgoing LT circuits. g Each Distribution Transformer of 25 KVA & above shall be provided with minimum two LT feeders. h If the peak load on existing 11KV feeder is more than 75% of rated thermal capacity of the conductor, conductor with higher capacity may be proposed or feeder bifurcation may be proposed. i
If peak load on existing 33/11KV S/S is more than 80% of its transformer capacity, new 33/11KV S/S may be proposed.
j 11 Kv feeder segregation may be proposed for reducing boundary metering points, fixing greater accountability and responsibility etc. k Ring Main Unit may be proposed in case of underground cabling area only. l Sectionaliser may be proposed in SCADA town only. m The Distribution Transformer may be provided with the capacitors of following ratings at LT side: (i) 100 KVA : 12 KVR (ii) 63 KVA : 8 KVR (iii) 40 KVA : 6 KVR (iv) 25 KVA : 4 KVR n Installation of ABC cables in dense, theft prone & congested areas. Both HT & LT ABC may be proposed. The capacity of ABC shall be 20% more than that of bare conductor, as thermal overloading capacity of ABC is less than Bare conductor. o In theft prone area and to improve HT:LT ratio, HVDS may be proposed. Total capacity of HVDS shall be higher by 20% than conventional LT S/S. p The following works/ items shall not be eligible for coverage under IPDS scheme: (i) Works already sanctioned under other schemes of Govt. of India (like R-APDRP/RGGVY/DDUGJY/NEF etc.). The projects for which any other grant / subsidy from Government of India has already been received / proposed to be received shall not be eligible under this scheme. (ii) AMI in the towns where SCADA is not planned under R-APDRP (iii) Civil works other than sub station (iv) Service lines to new consumers (v) GIS survey of consumers (vi) Cost of land for sub-stations (vii) Compensation towards right of way (viii) Distribution automation (ix) Office equipment / fixtures (x) Spares (other than mandatory spares prescribed by manufacturer) (xi) Tools and Plants (T&P) (xii) Vehicles
(xiii) Salaries and Establishment Expenditure
POWER FINANCE CORPORATION LTD. Detail Project Report Declaration This is to certify that: 1 Items Proposed in the DPR is for implmentation in urban area (Statutory Towns only). 2 DPR has been prepared in line with the guidelines of IPDS issued by Ministry of Power / PFC. 3 The proposed DPR includes only new works & excludes other works under implementation. Works taken up under GOI scheme viz RAPDRP/RGGVY/ NEF, etc is/are not included in this DPR. 4 Additional items proposed in R-APDRP towns has been proposed in separate sheet Vol II.b, clearly defining earlier sanction in R-APDRP, proposed new requirement in IPDS with proper justification. 5 All works proposed in the DPR are as per DPR Formats issued by Nodal Agency. Any cost other than allowed by Monitoring Committee in the DPR formats shall be borne by the Utility. 6 The cost estimates does not include any departmental overhead expenses. All such expenditures would be borne by the utility. 7 Utility will henceforth, procure all meters (wherever applicable) as per guidelines/regulations issued by MoP/CEA (circular available on IPDS web portal). 8 Utility shall ensure timely availability of any other infrastructure or facilities that are essential for implementation of IPDS works but are not in the scope of Contractor viz. land acqusition, Row, pole location etc. 9 Following items have been excluded from the scope of the DPR: (i) Works already sanctioned under other schemes of Govt. of India (like R-APDRP/RGGVY/DDUGJY/NEF etc.). The projects for which any other grant / subsidy from Government of India has already been received / proposed to be received shall not be eligible under this scheme. (ii) AMI in the towns where SCADA is not planned under R-APDRP (iii) Civil works other than sub station (iv) Service lines to new consumers (v) GIS survey of consumers (vi) Cost of land for sub-stations (vii) Compensation towards right of way (viii) Distribution automation (ix) Office equipment / fixtures (x) Spares (other than mandatory spares prescribed by manufacturer) (xi) Tools and Plants (T&P) (xii) Vehicles (xiii) Salaries and Establishment Expenditure 10 A senior level officer has been appointed by the Utility as Nodal Officer , who shall be involved from concept to commissioning of the system and co-ordinate from the Utility side for all issues related to implementation of the project. The details of Nodal Officer are given in Input Sheet. 11 Utility has created a dedicated team for implementation of projects at field & HQ levels to ensure smooth implementation of scheme. Detalis of the team are given in Input sheet. 12 Utility has appointed M/s WAPCOS Ltd, a Project Management Agency (PMA) for monitoring & ensuring timely implementation of the scheme. 13 Cost of consumer meters installed under R-APDRP will not be charged to consumers. 14 Work shall be awared within 06 months from date of communication of the approval of the Monitoring committee. & will be completed within 24 months from date of award. In case of departmental execution, the work will be completed within 30 months from date of communication of the approval of the Monitoring committee.. In either mode of implementation (turnkey/partial turnkey/departmental), the maximum time limit for completion of the project viz award and implementation shall not be beyond thirty months from date of communication of the approval of the Monitoring committee. 15 The item rates taken for the materials for preparation of the DPR is based on the approved latest Schedule of Rates. For the materials for which the rates are not avilable in Schedule of Rates, market Rates (duly approvd as per Utility system/procedure) or approved schedule rate of works / stock issue rate of other utility (indicated in the cost estimate) has been taken for this purpose. The Nodal Agency will separately provide comparable costs sourced from CPSUs for major equipment for reference of the utility. These reference rates shall be used as ceiling rates for sanctioning of the projects. 16 No cost escalation shall be admissible for the schemes sanctioned under IPDS. Any additional cost on any account whatsoever to complete the project shall be borne by utility. 17 5% of the project cost as approved by monitoring committee will be arranged by utility from own source & 10% will be arranged from PFC/REC or other Fis within three months of award/start of project. 18 Metering of all feeders and distribution transformers including metering at all input points to the utility shall be ensured under this scheme. Utility shall ensure installation of bounadry meters for ring fencing of Non-RAPDRP Towns having population more than 5000. 19 Projects sanctioned under R-APDRP scheme in the state/utility will continue to be implemented as per R-APDRP guidelines. 20 DPR has been prepared after detailed field survey, study of sytem & with full justification. No revision of DPR OR cost escalation will be proposed by Utility. 21 While formulating this DPR, consultation with the respective public representatives including Member of Parliament has been ensured. 22 The information and data given in this DPR are correct. 23 The DPR is technically & financially viable and tangible & intangible benefits will be achieved from implementation of this DPR making it bankable. 24 In case of private sector Discoms/Distribution Franchisee/Co-operative Societies, the project shall be implemented by
…………………………..(State Govt Agency).
Project Area In-charge (Govt/Govt Authorised Agency) Signature: Name: Er.Dheeraj Mittal , Designation: Superintending Engineer (OP) Nodal Officer (Govt Utility Implementing Project)
Tel. No. : 01792-221481 Email address :
[email protected]
Approved by: Signature: Name: Designation:
Er. Rajiv Awasthi Chief Engineer (SP)
Tel. No. / Mobile No. : 0177-2657901 / 9418069834 Email address :
[email protected]
POWER FINANCE CORPORATION LTD. Detail Project Report Executive Summary Project objective:-
This project aims at (i) 24x7 power supply for consumers in urban area, (ii) reduction of AT&C losses as per trajectory (discom-wise) finalized by the Ministry of Power in consultation with States (iii) providing access to all urban households
Tripartite/Bipartite Agreement Date Brief Profile of State/Utility Himachal Pradesh
Name of State Name of Utility (Short Name)
HPSEB Ltd
Total Number of Utility Consumers
2087604
AT&C loss as provided by PFC in latest “Report on Performance of State Power Utilities” AT&C Losses
%
9.53%
Project Area Profile Operation Circle-Solan
Name of the Project Area Circle/ Zone/ Utility) Nos. of towns covered
8 101128
Nos. of Consumers in all towns covered in the project area Data for Previous FY 2013-14
Data for AT&C Losses Computation for Project Area (All statutory towns of the Circle/ Zone/ Utility)
Unit
Energy Input
M Units
188.17
Energy Sales
M Units
175.93
Total Revenue Billed
Rs. Lac
6256.36
Total Revenue Collected (excluding arrears)
Rs. Lac
6118.02
Billing Efficiency
%
93.50%
Collection Efficiency
%
97.79%
AT&C Losses
%
8.57%
Name of the towns covered in project area and & its In-charges Name of Town
Town In Charge
Contact No.
Sr.Executive Engineer, EDArki
01796-220745
Sr.Executive Engineer, EDParwanoo
01792-233104
Nalagarh Town
Sr.Executive Engineer, EDNalagarh
01795-223097
Baddi Town
Sr.Executive Engineer, EDBaddi
01795-244111
Solan Town Subathu Town
Sr.Executive Engineer-ED, Solan
01792-221418
Arki Town Dagshai Town Kasauli Town Parwanoo Town
Project Funding Recommended Project Cost for Sanction
Rs. Lac
1422.10 Say Rs.14.22 Cr
Cost Item Total Setup Cost
Total Cost Rs.Lac
1422.10
GoI 1208.79
PFC/ FIs 142.21
Own 71.11
Say Rs.14.22 Cr Base YearYear-1 0 Phasing of Capital Expenditure
Rs.Lac
426.63
568.84
Year-2 426.63
POWER FINANCE CORPORATION LTD. Detail Project Report Background 1.1 Distribution is the most critical segment of the electricity business chain. The real challenge in the power sector today lies in efficient management of the distribution sector. Availability of a robust sub-transmission and distribution network along with adequate metering arrangements is the need of the day for efficient management of the distribution system. 1.2 Electricity is the key ingredient for accelerated economic growth and is considered vital for nation’s overall development. Providing reliable and quality power supply in an efficient manner is an immediate requirement of the day. Amongst the three major layers of Power Sector i.e. Generation, Transmission and Distribution, the Distribution Sector has direct interface with the end consumers and is largely accountable for consumer satisfaction and also for flow of revenues in the entire value chain of Power Sector. Thus, Distribution Sector plays a significant role in sustenance as well as growth of the Power Sector. 1.3 There is a consistent increase in electricity demand, particularly in urban areas, due to increase in customer base, changes in lifestyle and consumption pattern, which requires continual up-gradation and creation of infrastructure for electricity distribution. However, the poor financial health of the distribution utilities has resulted in inadequate investment in the distribution network. 1.4 The Government of India has been providing support to State owned Discoms/Power Departments by extending financial assistance through various programmes. However, the State owned Discoms/Power Departments have not been able to keep pace with the growth in demand of electricity, resulting in critical gaps/missing links in the sub transmission and distribution network. The subtransmission and distribution network has therefore become a bottleneck in ensuring reliable and quality power supply to the consumers. 1.5 Apart from bridging the gaps in the requisite distribution infrastructure, there is also a need to focus on metering of consumers. End-to-end metering is a vital need of the power sector. Effective metering of all consumers will ensure proper accounting, billing, load pattern assessment and planning of infrastructure required. It also helps in identifying high loss pockets so as to initiate remedial measures towards reduction of losses. Keeping in view the present financial condition of Discoms/Power Deptt., GoI has launched the Integrated Power Development Scheme (IPDS) to extend financial assistance against capital expenditure to address the gaps in sub transmission & distribution network and metering in Urban areas to supplement the resources of DISCOMs/Power Deptt.
POWER FINANCE CORPORATION LTD. Detail Project Report Volume I: Project Area Details Project Area Asset Information: Restricted to Urban area (Statutory Towns) only, to be considered under IPDS Assets Total Number 66/33 kV Feeders Total Length of 66/33 kV Feeders (Overhead) Total Length of 66/33 kV Feeders (Underground)
Unit Nos. kM
Current Position
Proposed under IPDS
5 67.70
kM
Total Number of 66/11 kV and 33/11 kV Sub-stations feeding the Project Area
Nos.
8
Total Number of Power Transformers
Nos.
19
Total Capacity of Power Transformers
MVA
260.85
Total Number 11 kV Feeders
Nos.
63
3
Number of Metered 11 kV Feeders
Nos.
63
3
Total Length of 11 kV Feeders (Overhead)
kM
Total Length of 11 kV Feeders (Underground)
kM
Total Length of LT Lines (Overhead)
kM
Total Length of LT Lines (Under-ground)
kM
HT/LT Ratio
484.470
25.895 0
478.331
8.200 0
1:0.99
1:0.32
Total Number of Distribution Transformers
Nos.
575
Total Capacity of Distribution Transformers
MVA
178.495
14.221
Total Annual Energy Input of previous FY
MUs
188.17
188.17
Current Peak Demand
MVA
216.63
216.63
Current Average Demand
MVA
163.7
163.7
Please specify name of town of Project area covered under Part-A (IT) of R-APDRP, if any. Please specify name of town of Project area covered under Part-A (SCADA/DMS) of RAPDRP, if any.
Solan & Baddi
66
POWER FINANCE CORPORATION LTD. Detail Project Report Volume IIa: SUMMARY Project Cost 4.1 Summary of Project Cost (Bill of Quantities)
A
33/11 KV S/S : New
Nos
Project Cost from Iib & Iic Rs. In Lac 0 0
B
33/11 KV S/S : Additional Transformer
Nos.
0
0
C
33/11 KV S/S : Transformer capacity enhancement
Nos.
0
0
D
Renovation & Modernisation of 33/11 kV SS
Nos.
0
0
E
New 33 KV new feeders/Bifurcation of feeders:
Kms
0
0
F
33 KV feeders Reconductoring/Augmentation
Kms
0
0
G
33 kV Line Bay Extension at EHV station
Nos
0
0
H
11 kV Line : New Feeder/ Feeder Bifurcation
Kms
25.895
151.667
I
11 kV Line : Augmentation/Reconductoring
Kms
41.500
130.476
J
Arial Bunched Cable
Kms
27.075
149.989
K
UG Cable
Kms
0
0
L
11 KV Bay Extension
Kms
0
0
M
Installation of Distribution Transformer
Nos.
60
199
N
Capacity enhancement of LT sub-station
Nos.
61
164
O
LT Line : New Feeder/ Feeder Bifurcation
Kms
8.200
38.286
P
LT Line : Augmentation/Reconductoring
Kms
11.223
22.625
Q
Capacitor Bank
Nos.
0
0
R
HVDS
Nos.
6
8
S
Metering
Nos.
10252
204
T
Provisioning of solar panel
Lot
443
354
U
RMU,Sectionaliser, Auto reclosures, FPI etc.
Lot
0
0
V
Others
Lot
0
1.20
SN
Particular
GRAND TOTAL
Unit
Qty
1,422.10 Say Rs.14.22 Cr
POWER FINANCE CORPORATION LTD. Detail Project Report
Solan RAPDRP Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Nos Nos Nos.
Sub Total
Existing/ Sanctioned under R-APDRP Current Position Qty Cost (Rs Lac)
Executed/ to-be executed (as Qty awarded) under R-APDRP proposed under IPDS Qty Cost (Rs Lac)
1
1
0 1
0 215.09
0 1
0 148.40
0
1
215.09
1
148.40
0
0
0
0
0
0 2.14
0 30.00
0 322.95
0 30.00
0 299.69
2.14
30.00
322.95
30.00
299.69
0
0
0
0
0
0 199.94
0 32.70
0 217.92
0 15.00
0 130.46
199.94
32.70 38.90
217.92 159.04
15.00 53.90
130.46 321.16
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement Nos. Nos. Nos.
1 2 3 Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS Nos. Nos. Nos.
Sub Total E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
F 1 2 3
33 KV feeders Reconductoring/Augmentation
G 1 2 3
33 kV Line Bay Extension at EHV station
H 1 2 3
11 kV Line : New Feeder/ Feeder Bifurcation
I
11 kV Line : Augmentation/Reconductoring
Kms Kms Kms
Sub Total Kms Kms Kms
Sub Total Nos Nos Nos
Sub Total Kms Kms Kms
Sub Total
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location
S. No.
Item Details
Unit
Existing/ Sanctioned under R-APDRP Executed/ to-be executed (as Qty awarded) under R-APDRP Current proposed Position under IPDS Qty Cost (Rs Lac) Qty Cost (Rs Lac)
Kms Kms Kms
1 2 3 Sub Total
0
38.90
159.04
53.90
321.16
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location
S. No.
J
Item Details
Unit
Existing/ Sanctioned under R-APDRP Executed/ to-be executed (as Qty awarded) under R-APDRP Current proposed Position under IPDS Qty Cost (Rs Lac) Qty Cost (Rs Lac)
Arial Bunched Cable i) HT Kms Kms Kms
Sub Total
15
15
0.00
0.00
0.00
0.00
0.00 15.00
0.00 0.00
0.00 0.00
0.00 0.00
0.00 0.00
0
0
0
0
0
0 0
0.00 0.00
0.00 0.00
0 0
0.00 0.00
0
0
0
0
0
285
47
209.53
40
150.43
285
47 16
209.53 51.82
40 16
150.43 55.35
0 158.328
16 5.40
51.82 16.35
16 18.31
55.35 73.58
158.328
5.40 77.10
16.35 195.91
18.31 82.93
73.58 281.46
0
77.10 263
195.91 32.29
82.93 263
281.46 17.56
ii) LT Kms Kms Kms
Sub Total Total K
UG Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms Kms
Sub Total M
Installation of Distribution Transformer Nos. Nos. Nos.
Sub Total N
Capacity enhancement of LT sub-station Nos. Nos. Nos. Nos. Nos.
Sub Total O
LT Line : New Feeder/ Feeder Bifurcation Kms Kms Kms
Sub Total P
LT Line : Augmentation/Reconductoring Kms Kms Kms
Sub Total Q
Capacitor Bank
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location
S. No.
Item Details
Unit
Existing/ Sanctioned under R-APDRP Executed/ to-be executed (as Qty awarded) under R-APDRP Current proposed Position under IPDS Qty Cost (Rs Lac) Qty Cost (Rs Lac)
Nos. Nos. Nos.
Sub Total
0
263.00
32.29
263.00
17.56
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location
S. No.
Item Details
Unit
Existing/ Sanctioned under R-APDRP Executed/ to-be executed (as Qty awarded) under R-APDRP Current proposed Position under IPDS Qty Cost (Rs Lac) Qty Cost (Rs Lac)
HVDS
R
14
39.46
0
0
0
14
39.46
0
0
7
9
0.95
7
1.02
11 285 49 275
15 220 31 275
1.59 32.26 3.94 15.04
11 288 17 275
1.110 61.522 1.450 15.030
42295
27284
423.07
22184
330.09
1132
477
22782
410.222
1132.00
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location
Nos. Nos. Nos.
Sub Total Metering
S
Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
iii) iv) a b c d v) vi)
established under R-APDRP. Boundary meters for ring fencing of Non-RAPDRP Towns with population more than 5000 AMR for feeders, Distribution transformer and high load consumers Metering-Feeder Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories
Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.
19.244
Ann-MT
Nos.
Sub Total
42922
19.244
Provisioning of solar panel
T
1
Solar Panel with Net Metering
KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
KWe KWe Nos.
Sub Total U
0.017
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
155.00
0
Nos. Nos.
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker
Nos.
vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Nos.
0.798
123.690
0
0
0
0
155.00
123.690
0
0
0
0
0
0
0 0 0 10 0 0
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker .
0 Nos.
Sub Total
10
33/11 kV SS- Kather, HPSEBL Circle office, DC Office, New Mini Sectt., New Bus Stand, Thodo Ground, Shoolini Temple, IPH office, HPSEBL Central Store, Ckt. House & Govt. college.
S. No.
V a b c
Item Details
Unit
Others GPRS based SBM for 1-Ph meter Mobile Service Center Revamping of DTR, PVC Cable, Meters
Nos. Nos. Job
Sub Total Grand Total Note: Unit price and Total Cost are inclusive of all taxes and duties
Existing/ Sanctioned under R-APDRP Executed/ to-be executed (as Qty awarded) under R-APDRP Current proposed Position under IPDS Qty Cost (Rs Lac) Qty Cost (Rs Lac) 15 0 0
30.00 2.00 1.00
3.00 19.45 336.36
30.00 1.00 1.00
6.83 13.74 381.39
358.81 2,296.02
32.00
401.96 2,290.27
0.00 0.000
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
0 142.93
Reference Annx No.
Location
POWER FINANCE CORPORATION LTD. Detail Project Report
Baddi RAPDRP Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities
S. No.
Item Details
A 1 2 3
33/11 KV or 66/11 kV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Sanctioned under R-APDRP
Existing/ Current Position
2
Executed/ to-be executed (as awarded) under R-APDRP
Qty
Cost (Rs Lac)
Qty
Cost (Rs Lac)
1
1228.31
1
1341.14
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
-
Nos Nos Nos.
Sub Total
2
1 3
1,228.31 1658.81
1 3
1,341.14 1312.08
0
0
3
1658.81
3
1312.08
0
0
Nos. Nos. Nos.
Sub Total
0
C 33/11 KV S/S : Transformer capacity enhancement
Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS
E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
F 1 2 3
33 KV feeders Reconductoring/Augmentation
G 1 2 3
33 kV Line Bay Extension at EHV station
0
0
0
0
0
0
0
Nos. Nos.
-
Nos.
Sub Total
0 19.00
0
0
0
0
0
0 -
Kms Kms Kms
Sub Total
19.00
0.00
0.00
0.00
0.00
0
0 -
Kms Kms Kms
Sub Total
0
0
0
0
0
0
0 -
Nos Nos Nos
Sub Total H 1 2
-
Nos. Nos. Nos.
1 2 3
11 kV Line : New Feeder/ Feeder Bifurcation Kms Kms
0
0
0
0
0
165.59
129.95
2158
102.65
1408.97
0
Reference
0 -
Location / Remarks
S. No.
Item Details
Unit
Sub Total
Qty
Cost (Rs Lac)
Qty
Cost (Rs Lac)
129.95
2158.00
102.65
1408.97
38.5
97.05
38.50
109.22
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
11 kV Line : Augmentation/Reconductoring
0
0 -
Kms Kms Kms
0.00
38.50
97.05
38.50
109.22
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15
25
133.99
25
183.0
15 15
25 25
133.99 133.99
25 25
183 183
0 0
0 0
3.50
7.50
1945.90
2.25
424.51
3.50
7.50
1945.9
2
425
0
0
0 3.50
0 7.50
0 1945.90
0 2
0 425
0 0
0
0
0
0
0
0
158
94
213.43
108
327.854
Arial Bunched Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total K
UG Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total L
0
0
0 0
11 KV Bay Extension Kms Kms Kms
Sub Total M
Installation of Distribution Transformer
0
-
Nos. Nos. Nos.
Sub Total N
158
94
213.43
108
327.85
30
127.02
30
130.55
0
30
127.02
30
0.00
158.328
22.25
99.67
20.55
105.06
Capacity enhancement of LT sub-station
0
0
0
0
Nos. Nos. Nos. Nos. Nos.
Sub Total O
LT Line : New Feeder/ Feeder Bifurcation
Reference
Annx No. -
165.59
Sub Total J
Executed/ to-be executed (as awarded) under R-APDRP
Kms
3 I 1 2 3
Existing/ Current Position
Sanctioned under R-APDRP
Location / Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Sanctioned under R-APDRP
Qty
Cost (Rs Lac)
Executed/ to-be executed (as awarded) under R-APDRP Qty
Cost (Rs Lac)
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Kms Kms
Sub Total
158.328
LT Line : Augmentation/Reconductoring
22.250
99.670
20.550
105.060
26.50
63.44
26.5
88.45
0
Sub Total
Location / Remarks
0 -
Kms Kms Kms
0
26.50 272
63.44 25.52
26.50 272
88.45 15.090
0
0
0.00
272
25.520
272
15.090
0
0
75
211.29
0
0
0
75
211.29
0
0.00
0
0
Nos.
1
3
4.77
1
0.39
Nos. Nos. Nos. Nos. Nos.
26 158 340 467
31 268 22 467
3.286 40.22 2.332 25.53
30 111 44 467
3.04 29.82 12.02 25.53
14152
7200
137.80
7200
104.98
3000
12.024
0
0
10991
225.962
7853
175.8
Capacitor Bank
Q
Annx No. -
Kms
P
Reference
Nos. Nos. Nos.
Sub Total HVDS
R
Nos. Nos. Nos.
Sub Total S
Metering Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
iii) iv) a b c d v)
vi)
established under R-APDRP. Boundary meters for ring fencing of Non-RAPDRP Towns with population more than 5000 AMR for feeders, Distribution transformer and high load consumers Metering-Feeder Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories
Nos.
Nos. Nos.
Sub Total T
1
-
15144
1.227
3263
0.017
3263
0
-
55.471
55.471
Ann-MT_FD
Ann-MT
0
Provisioning of solar panel
Solar Panels with Net Metering
KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
KWe
73
0.798
58.254
KWe Nos.
Sub Total
0
0
0
0
73
58.254
As per PFC
Electrical Sub-Division Office, SP Office, Drug Office, HIMUDA complex, ESCI Hospital, HPSIDC , Bus Stand (Baddi), BBNI Office & Police Station
S. No.
U
Item Details
Unit
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
Cost (Rs Lac)
Qty
Cost (Rs Lac)
0
0
315 200 1 1
120 22 44 336
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Nos. Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Qty
Executed/ to-be executed (as awarded) under R-APDRP
Nos.
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker
Existing/ Current Position
Sanctioned under R-APDRP
Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
Sub Total V a b c d
Others Replacement of 2 terminal CT PT with 3 Terminal CT PT unit Replacement of LT CT PT meter with 3 phase 4 wire HT meter Mobile service center Revamping of DTR/ 11 KV HT lines/LT lines Sub Total Grand Total
Note: Unit price and Total Cost are inclusive of all taxes and duties
0 Nos. Nos. nos. Job
0 310 200 1 1
94.13 13.55 8.48 154.28
512
270.44 8458.83
521.68 6012.83
0
0
0.00 113.73
Reference
Annx No.
Location / Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Dagshai Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Existing/ Current Position
Qty proposed under IPDS
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Nos.
0
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement Nos. Nos.
Sub Total D 1 2 3
-
Nos.
1 2 3
0
0
0
Renovation & Modernisation of 33/11 kV SS Nos.
-
Nos. Nos.
Sub Total
0
0
Reference Annx No.
-
Nos Nos
Sub Total
Unit Price
0
Location/ Remarks
S. No. E 1 2
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
New 33 KV new feeders/Bifurcation of feeders: Kms Kms
Reference
-
Location/ Remarks
S. No.
Item Details
Unit
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Sub Total F 1 2 3
33 KV feeders Reconductoring/Augmentation
G 1 2 3
33 kV Line Bay Extension at EHV station
0
Annx No.
0 -
Kms Kms
0
0
0 -
Nos Nos Nos
Sub Total
0
0
0
11 kV Line : New Feeder/ Feeder Bifurcation Kms
1
Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
2 3
14.00
5.857
14.00
23.43
Ann-HT_11
Ward No.3, Biswas Sadan Dagshai, Bohra Mohalla, Dhobi Mohalla, Mahadu Mohalla & Cantt Board Area near MES Colony Dagshai.
Ann-HT_12
Various feeders of Dagshai Town.
23.428
4.000
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
5.000
Kms Kms Kms
2 3 Sub Total J
4.00
Kms Kms
Sub Total I 1
Location/ Remarks
0
Kms
Sub Total
Reference
-
Kms
3
H
Existing/ Current Position
0
Arial Bunched Cable i) HT Kms Kms
5.000
3.144
15.720 15.720
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Kms
Sub Total ii) LT
0
0
Reference
0
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles. under ESD, Dharampur Kms
2.000
6.195
12.390
Ann-LTAB_11
Various Sub-Station of Dagshai Town
2
Recond. 3 phase LT Line with AB Cable 120 mm sq
3.000
4.753
14.259
Ann-LTAB_12
Various Sub-Station of Dagshai Town
Kms Kms
Sub Total Total K
0 0
5.000 5.000
26.649 26.649
0
0
0
0 0
0 0
0 0
0
0
0
UG Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms Kms
Sub Total M
Installation of Distribution Transformer
1
11/0.4 kV, 63 KVA SS
2
11/0.4 kV, 100 KVA SS
18 Nos. Nos.
2
2.736
5.472
Ann-DT_11
Ward No.3 & Biswas Sadan Dagshai
2
3.086
6.172
Ann-DT_11
Bohra Mohalla & Dhobi Mohalla.
S. No.
3
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS 2
11/0.4 kV, 250 KVA SS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
4.497
8.994
Nos.
Sub Total
18
6
20.638
Reference Annx No.
Location/ Remarks
Ann-DT_11
Mahadu Mohalla & Cantt Board Area near MES Colony Dagshai.
S. No.
Item Details
Unit
N 1 2
Capacity enhancement of LT sub-station 25 KVA to 63 KVA 25 KVA to 100 KVA
Nos. Nos.
3
50/63 KVA to 100 KVA
Nos.
4
100 KVA to 250 KVA
5
250 KVA to 400 KVA
O
LT Line : New Feeder/ Feeder Bifurcation
1
New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
Existing/ Current Position
Qty proposed under IPDS
1
Sub Total Kms
Rs. Lac
Rs. Lac
Sub Total P 1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
1.402
4.206
Ann-DT_12
Police Chowki, Dagshai-1 & Near Telephone Exchange
3
2.622
7.866
Ann-DT_12
Dagshai-II, Pathan Mohalla & Charring Cross.
8.241
13.218
Ann-DT_12
4.669
9.338
Ann-LT_12
7
11.000
2.000
Sub Total Q
2.016
8.064
0
4
8.064
0
0
0
0
0
Kms Kms
Capacitor Bank Nos. Nos. Nos.
Sub Total R
HVDS Nos. Nos.
-
Nos.
Sub Total
Pigri Mohall Dagshai.
Ann-DT_12
9.338
2.000 4.000
Kms
Location/ Remarks
3
0
11.000
Annx No. Ann-DT_12
Kms Kms
LT Line : Augmentation/Reconductoring
Reference
1.146 -
-
Nos.
Cost proposed under IPDS
1.146 1.525
-
Nos.
Unit Price
0
Ann-LT_13
Various Sub-Station of Dagshai Town
S. No. S
Item Details
Metering i) Prepaid / smart meters in Govt. establishment
Unit
Nos.
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
ii) AMI, Smart meters in the towns where SCADA being
established under R-APDRP.
Nos.
iii) Boundary meters for ring fencing of Non-RAPDRP Towns with iv) 1 2 3 4 v) vi)
population more than 5000 AMR for feeders, Distribution transformer and high load consumers Metering-Feeder Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories
Nos. Nos. Nos. Nos. Nos.
Provisioning of solar panel Location 1 ……………. /( Capacity) Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
Nos.
2.535
Ann-MT
5.202
Ann-MT
405
306
0.017
426
319
7.737
0
0
0
KWe KWe KWe Nos.
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
Ann-MT
.
Nos.
Sub Total U
0.195 0.195
Nos.
Sub Total T
18 3
13
Nos. Nos.
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
Location/ Remarks
S. No.
Item Details
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker
Unit
Nos.
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
S. No.
Item Details
Unit
vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
V
Sub Total
0
0
0
Sub Total Grand Total
0
0
0 124.79
Others
Note: Unit price and Total Cost are inclusive of all taxes and duties
Reference Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Kasauli Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Nos
Existing/ Current Position
Qty proposed under IPDS
1
Cost proposed under IPDS
Rs. Lac
Rs. Lac
1
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement
Nos.
Sub Total D 1 2 3
0
0
0
Renovation & Modernisation of 33/11 kV SS Nos. Nos.
-
Nos.
Sub Total E 1 2 3
-
Nos. Nos.
1 2 3
0
0
0
New 33 KV new feeders/Bifurcation of feeders: Kms
16.50
-
Kms Kms
Sub Total
16.50
0
Reference Annx No.
-
Nos Nos.
Sub Total
Unit Price
0
Location/ Remarks
S. No. F 1 2
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
33 KV feeders Reconductoring/Augmentation Kms Kms
Reference
-
Location/ Remarks
S. No.
Item Details
Unit
Sub Total
1
0
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
0
Ann-HT_11
New feeder from Garkhal to Court Complex Kasauli and spur for new DTRs at Uppar Mall, Mashobra, Drum Bar, Near Cantt. Office & Near Bus Stand Kasauli.
Ann-HT_12
Various feeders of Kasauli Town
0 -
Nos
0
0
0
11 kV Line : New Feeder/ Feeder Bifurcation
New feeder and Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
Kms
8.000
4.500
5.857
Kms
8.000
26.36
26.357
Kms
Sub Total
4.500
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
2 3
5.000
Kms Kms Kms
Sub Total J
Cost proposed under IPDS
Nos Nos
2 3 I 1
Unit Price
33 kV Line Bay Extension at EHV station
Sub Total H
Qty proposed under IPDS
Kms
3 G 1 2 3
Existing/ Current Position
3.144
15.720
0
5.000
15.720
0
0
0
Arial Bunched Cable i) HT Kms Kms Kms
Sub Total ii) LT 1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles. under Kms ESD, Dharampur
2
Recond. 3 phase LT Line with AB Cable 120 mm sq
Kms
-
6.195
3.500
4.753
16.636
Ann-LTAB_11 Ann-LTAB_12
Various Sub-Station of Kausali Town
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Kms
Sub Total Total
0 0
3.500 3.500
16.636 16.636
Reference Annx No.
Location/ Remarks
S. No. K
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
UG Cable i) HT Kms Kms
Sub Total
0
0
0
0 0
0 0
0 0
0
0
0
ii) LT Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms
Sub Total M
Installation of Distribution Transformer
1
11/0.4 kV, 63 KVA SS
2
11/0.4 kV, 100 KVA SS
3
11/0.4 kV, 250 KVA SS
N 1 2 3
Capacity enhancement of LT sub-station
50/63 KVA to 100 KVA
4
20 Nos. Nos. Nos.
Sub Total
20
2
2.736
5.472
Ann-DT_11
Uppar Mall & Mashobra
2
3.086
6.172
Ann-DT_11
Drum Bar & Near Cantt. Office
1
4.497
4.497
Ann-DT_11
Near Bus Stand Kasauli.
Gara Jodidar
5
Nos.
1.146 1.402
Ann-DT_12
1
1.146 1.525 1.402
Ann-DT_12
Khachhar Khana
100 KVA to 250 KVA
Nos.
4
2.622
10.488
Ann-DT_12
Mashobra-II, Slaughter House-I, Slaughter HouseII & Rose Common-I.
5
250 KVA to 400 KVA
Nos.
1
8.241
8.241
Ann-DT_12
Tehsil Kasauli.
O
LT Line : New Feeder/ Feeder Bifurcation
25 KVA to 63 KVA
1
16.141
Nos.
-
25 KVA to 100 KVA
Sub Total
0
7
21.277
Ann-DT_12
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
Ann-LT_12
Uppar Mall, Mashobra, Drum Bar, Near Cantt. Office & Near Bus Stand Kasauli.
Kms
1
New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
21.000
1.250
4.669
5.836
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Sub Total P 1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
21.000
1.250 3.000
Kms
2.016
6.048
0
3.000
6.048
0
0
0
Kms Kms
Sub Total
Annx No.
Location/ Remarks
5.836
Kms Kms
LT Line : Augmentation/Reconductoring
Reference
Ann-LT_13
Various Sub-Stations of Kasauli town.
Capacitor Bank
Q
Nos. Nos. Nos.
Sub Total HVDS
R
Nos. Nos.
-
Nos.
Sub Total
0
0
0
Metering
S
Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
established under R-APDRP.
Nos.
iii) Boundary meters for ring fencing of Non-RAPDRP Towns with
population more than 5000 Nos. iv) AMR for feeders, Distribution transformer and high load consumers Nos. 1 Metering-Feeder 2 3 4 v)
Nos.
12
3
0.195
Nos. Metering- DT Nos. Metering- HT Nos. Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters Nos.
20 24
12
0.195
3000
0.585
Ann-MT
2.340
Ann-MT As per RAPDRP
Per unit cost include modem cost also
. 9
0.055
0.491
760
0.017
12.920
Ann-MT
###
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
vi) Installation of Pillar Box for relocation of meters outside the
premises of consumers including associated cables and accessories Nos. Sub Total
784
16.336
0
0
0
Sub Total
0
0
0
Sub Total Grand Total
0
0
0 124.35
Provisioning of solar panel Location 1 ……………. /( Capacity) Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
T
3056 KWe KWe KWe Nos.
Sub Total RMU,Sectionaliser, Auto reclosures, FPI etc. U Nos. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F) Nos. iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
V
Reference
Others
Location/ Remarks
S. No.
Item Details
Note: Unit price and Total Cost are inclusive of all taxes and duties
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Parwanoo Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Existing/ Current Position
Qty proposed under IPDS
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Nos Nos.
0
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement
Nos.
Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS
E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
0
0
Nos. Nos.
0
-
Nos.
Sub Total
0
0
Kms
33 KV feeders Reconductoring/Augmentation
0 -
Kms Kms
Sub Total F
-
Nos. Nos.
1 2 3
0
0
Reference Annx No.
-
Nos
Sub Total
Unit Price
0
Location/ Remarks
S. No. 1 2 3
Item Details
Unit
Kms Kms Kms
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
-
Location/ Remarks
S. No.
Item Details
Unit
Sub Total G 1 2 3
33 kV Line Bay Extension at EHV station
H
11 kV Line : New Feeder/ Feeder Bifurcation
Existing/ Current Position
Qty proposed under IPDS 0
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
0
Annx No.
Location/ Remarks
Ann-HT_11
New feeder Parwanoo To Masool Khana and spur lines for DTRs at Kurla, Namsari, Koti-III, Sanana Nakyar, SecIV, Ambota, Kamli, Dhaggar, Sec-IA Parwanoo, Jabli, Taksal, Naryal, Sec-II (Parwanoo) & Sec-III (Parwanoo).
Ann-HT_12
Jabli Feeder, Feeders of Sector-I,II,III,IV,V &VI (Parwanoo)
0 -
Nos Nos Nos
Sub Total
Reference
0
0
0
Kms
1
New feeder and Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
2 3
60.000
60.000
49.20
49.199
8.400
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
2 3
24.000
3.144
Kms Kms
75.456
0
24.000
75.456
0
0
0
Kms
Sub Total J
5.857
Kms Kms
Sub Total I 1
8.400
Arial Bunched Cable i) HT Kms Kms Kms
Sub Total ii) LT 1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles. under Kms ESD, Dharampur
-
6.195
-
Ann-LTAB_11
S. No.
2
Item Details
Unit
Recond. 3 phase LT Line with AB Cable 120 mm sq
Existing/ Current Position
Qty proposed under IPDS 4.000
Kms
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
4.753
19.012
Kms
Sub Total
0
4.000
19.012
Reference Annx No. Ann-LTAB_12
Location/ Remarks Sub-Station of SectorI,II,III,IV,V &VI (Parwanoo)
S. No.
Item Details
Unit
Total K
Existing/ Current Position
Qty proposed under IPDS
Unit Price Rs. Lac
Cost proposed under IPDS
0
4.000
Rs. Lac 19.012
0
0
0
0 0
0 0
0 0
0
0
0
40
6
2.736
4 4
Reference Annx No.
Location/ Remarks
16.416
Ann-DT_11
Kurla, Namsari, Koti-III, Sanana Nakyar, Sec-IV & Ambota.
3.086
12.344
Ann-DT_11
Kamli, Dhaggar, Sec-IA Parwanoo & Jabli.
4.497
17.988
Ann-DT_11
Taksal, Naryal, Sec-II (Parwanoo) & Sec-III (Parwanoo).
Ann-DT_12
Jodhpur, Soghi, Barog & Banasar.
UG Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms Kms
Sub Total M
Installation of Distribution Transformer
1
11/0.4 kV, 63 KVA SS Nos.
2
11/0.4 kV, 100 KVA SS
3
11/0.4 kV, 250 KVA SS
Nos.
Nos.
Sub Total N
Capacity enhancement of LT sub-station
1
25 KVA to 63 KVA
2
25 KVA to 100 KVA
3
50/63 KVA to 100 KVA
40
14 4
Nos.
-
1.146 1.525
6 Nos.
46.748
1.402
4.584 8.412
Ann-DT_12 Ann-DT_12
Shewla, Kurari, Ranigaon, Sandog, Tharu Garh & Taksal.
S. No.
4
Item Details
Unit
100 KVA to 250 KVA
5
250 KVA to 400 KVA
O
LT Line : New Feeder/ Feeder Bifurcation
Qty proposed under IPDS
8
Nos.
5
Nos.
Sub Total
1
Existing/ Current Position
New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
0
Kms
40.00
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
2.622
8.241
23
3.500
4.669
LT Line : Augmentation/Reconductoring
1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
40.000
3.500
4.223 Kms Kms
Sub Total Q
16.342
2.016
8.513
0
4.223
8.513
0
0
0
Kms
Capacitor Bank Nos. Nos. Nos.
Sub Total R
HVDS Nos.
Location/ Remarks
Ann-DT_12
Near Sector-VI Gumma, Masool Khana, Tipra, Naryal, Sector-IA Parwanoo, SectorIV Parwanoo, Deli & Apple Mandi.
Ann-DT_12
Near R K Industries Parwanoo, Near Pole Factory Sec-II, BCI Bearing, Sector-III & Sector-IV.
Ann-LT_12
Kurla, Namsari, Koti-III, Sanana Nakyar, Sec-IV, Ambota, Kamli, Dhaggar, Sec-IA Parwanoo, Jabli, Taksal, Naryal, Sec-II (Parwanoo) & Sec-III (Parwanoo).
Ann-LT_13
Various Sub-Stations of Sector-I,II,III,IV,V &VI (Parwanoo)
16.342
Kms
P
41.205
Annx No.
75.177
Kms
Sub Total
20.976
Reference
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Nos. Nos.
Sub Total
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No. -
0
0
Reference
0
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
Metering
S
Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
established under R-APDRP. Nos. iii) Boundary meters for ring fencing of Non-RAPDRP Towns with population more than 5000 Nos. iv) AMR for feeders, Distribution transformer and high load consumers Nos. 1 Metering-Feeder
Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters vi) Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories 2 3 4 v)
3.681
Ann-MT_FD
Per unit cost include modem cost also
Per unit cost include modem cost also
10
1
0.195
0.195
Ann-MT
Nos. Nos.
40 205 21
37
0.195
7.215
Ann-MT
10
0.055
0.546
As per RAPDRP
5000
528
0.017
8.976
Ann-MT
5276
579
Nos. Nos.
.
Nos.
20.613
Provisioning of solar panel Solar Panel with Net metering
25
KWe KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
0.798
19.950
KWe Nos.
Sub Total U
1.227
Nos.
Sub Total T 1
3
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
0
Nos. Nos. Nos.
25
19.950
As per PFC
Electrical Division, MC Complex, Excise Office, DSP Office & ESI Hospital.
S. No.
Item Details
Unit
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F) v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Nos. Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
V
Sub Total
0
0
0
Sub Total Grand Total
0
0
0 331.01
Others
Note: Unit price and Total Cost are inclusive of all taxes and duties
Reference Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Nalagarh Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Nos Nos
Existing/ Current Position
Qty proposed under IPDS
1
Cost proposed under IPDS
Rs. Lac
Rs. Lac
1
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement
-
Nos. Nos.
1 2 3
Nos.
Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS
E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
0
0
-
Nos.
Sub Total
0 Kms Kms
0
-
0.00
0 -
Kms
Sub Total F 1 2
0
Nos. Nos.
0
0
33 KV feeders Reconductoring/Augmentation Kms Kms
Reference Annx No.
-
Nos.
Sub Total
Unit Price
-
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Kms
3 Sub Total
0
0
Reference
0
Location/ Remarks
S. No. G 1 2 3
Item Details
Unit
1
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
Ann-HT_11
Durga Mandir, Pathsala, Bank Complex (Jogindera Bank ), Vetenary Hospital, Himfed, Rakhgansot, Chuhuwl-II, Friends Colony, Driveinn-I, Vikas Nager, Peer Sathan Petrol Pump, Peer Sathan-Hanuman Mandir, Dadi Vhola-II, Doon Vally Public School, Nalagarh phase-I A, Nalagarh phase-I B, Nalagarh phase-I C & for proposed HVDS.
Ann-HT_12
MIDC Feeder & Ram Shehar Feeder.
-
Nos
0
0
0
11 kV Line : New Feeder/ Feeder Bifurcation
New feeder / Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
Kms
6.300
6.695
5.857
Kms
6.300
39.21
39.213
Kms
Sub Total
6.695
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
2 3
5.000
Kms Kms
3.144
0
15.720 15.720
Kms
Sub Total J
Unit Price
Nos Nos
2 3 I 1
Qty proposed under IPDS
33 kV Line Bay Extension at EHV station
Sub Total H
Existing/ Current Position
5.000
Arial Bunched Cable i) HT 1 New HT spur with AB Cable 95 mm sq on 9 Mtr long S/T Poles
0.800
Kms
9.066
7.253
Kms Kms
Sub Total ii) LT
0
0.800
7.253
Ann-HTAB_11
Adarsh Nagar, Kumar Mohalla, Mehta Colony & Shitla Mandir.
S. No.
Item Details
Unit
1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles. under ESD, Dharampur
2
Recond. 3 phase LT Line with AB Cable 120 mm sq
Existing/ Current Position
Qty proposed under IPDS
3.500
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
6.195
21.683
Reference Annx No.
Location/ Remarks
Ann-LTAB_11
Mahlotra Chowk Ist, Pathsala, Kumar Mohallal, Bank Complex, Mehta Complex , Jogindera Bank & Vetenary Hospital.
Kms
-
Kms
4.753
-
Ann-LTAB_12
Kms
Sub Total Total K
0 0
3.500 4.300
21.683 28.935
0
0
0
0 0
0 0
0 0
0
0
0
UG Cable i) HT Kms Kms Kms
Sub Total ii) LT Kms Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms Kms
Sub Total M 1
Installation of Distribution Transformer 11/0.4 kV, 63 KVA SS
Nos.
29
-
2.736
-
Ann-DT_11
S. No.
2
Item Details
11/0.4 kV, 100 KVA SS
Unit
Nos.
Existing/ Current Position
Qty proposed under IPDS
27
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
3.086
83.322
Reference Annx No.
Location/ Remarks
Ann-DT_11
Durga Mandir, Pathsala, Bank Complex (Jogindera Bank), Vetenary Hospital, Himfed, Rakhgansot, Chuhuwl-II, Friends Colony, Driveinn-I, Vikas Nager, Peer Sathan Petrol Pump, Peer Sathan-Hanuman Mandir, Dadi Vhola-II, Doon Vally Public School, Nalagarh phase-I A, Nalagarh phase-I B, Nalagarh phase-I C, Adarsh Nager, Kumar Mohalla & Mehta Colony.
S. No.
Item Details
3
11/0.4 kV, 250 KVA SS
N
Capacity enhancement of LT sub-station
1
25 KVA to 63 KVA
2
25 KVA to 100 KVA
3
50/63 KVA to 100 KVA
Unit
100 KVA to 250 KVA
5
250 KVA to 400 KVA
Qty proposed under IPDS 2
Nos.
Sub Total
4
Existing/ Current Position
29
Nos.
O
LT Line : New Feeder/ Feeder Bifurcation
1
New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
Kms
4.497
Sub Total 1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
45.000
Sub Total
-
Ann-DT_12
1.402
2.622
36.708
8.241
42.316
18 -
5.608
4.669
-
0.000 2.016
-
Ann-DT_12
Rakh Ghansot, Govt. Colony, Kumhar Mohalla I, Kumhar Mohalla II, Tikkar Panoh, Bangala Panoh, Court Complex, Girls Hostel, Ramlila Ground, Dattowal, Dattowal Hypen Carbon, Thakur Dwara, New Nalagarh Phase-I & New Nalagarh Phase-II.
Ann-DT_12
Ann-LT_13
0
0.000
0.000
0
0
0
Nos. Nos.
Sub Total
Abhipur, Friends Colony & Boys Hostel.
0.000
Capacitor Bank
HVDS
Ann-DT_12
Ann-LT_12
Nos.
R
Jodhpur, Soghi, Barog & Banasar.
1.525
Kms
Q
Shitla Mandir & shopping Complex Purana Thana.
-
-
Kms Kms
Ann-DT_11
Ann-DT_12
Kms
LT Line : Augmentation/Reconductoring
8.994
Location/ Remarks
92.316
Kms
P
Annx No.
-
14
45.000
Rs. Lac
1.146
4
0
Rs. Lac
Reference
-
Nos.
Sub Total
Cost proposed under IPDS
29
Nos.
Nos.
Unit Price
S. No.
1
Item Details
1-Ø 11/0.230 kV, 16 kVA SS
Unit
Nos.
Existing/ Current Position
Qty proposed under IPDS 5
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
1.279
6.395
Reference Annx No.
Location/ Remarks
Ann-HVDS
MIDC Colony, Govt. Colony, Gurudwara & Ward No. 7 (Nalagarh )
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
0
iv) 1 2 3 4 v) vi)
established under R-APDRP. Boundary meters for ring fencing of Non-RAPDRP Towns with population more than 5000 AMR for feeders, Distribution transformer and high load consumers Metering-Feeder Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories
Per unit cost includes modem cost also.
Nos.
2
1.227
2.454
Ann-MT_FD
47
0.195 0.195
9.165
Ann-MT Ann-MT
2
0.055
0.109
As per RAPDRP
4735
325
0.017
5.525
Ann-MT
4766
376
Nos. Nos. Nos. Nos.
2 29
.
Nos. Nos. Nos.
Nos.
Sub Total
17.253
Provisioning of solar panel
Solar Panel with Net metering
KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
KWe
125.00
0.798
99.750
KWe Nos.
Sub Total U
5
Metering Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
iii)
1
Location/ Remarks
6.395
Nos.
Sub Total
T
Annx No.
Nos.
2
S
Reference
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
0
Nos. Nos.
125.000
99.750
As per PFC
66/33/11 kV SS Nalagarh, Residential Complex (Nalagarh), Mini Sectt., Bus Stand Complex, ITI Complex, Govt. PG College, MC Complex & SDM office.
S. No.
Item Details
Unit
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
V
Sub Total
0
0
0
Sub Total Grand Total
0
0
0 341.90
Others
Note: Unit price and Total Cost are inclusive of all taxes and duties
Reference Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Sabathu Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
1 -
Nos Nos Nos.
Sub Total
1
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement
Nos.
Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS
E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
0
0
Nos. Nos.
0
-
Nos.
Sub Total
0 12.40
0
0 -
Kms Kms Kms
Sub Total F 1
-
Nos. Nos.
1 2 3
12.40
0
0
33 KV feeders Reconductoring/Augmentation Kms
Reference
-
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Sub Total
Cost proposed under IPDS
Rs. Lac
Rs. Lac
0
0
Reference Annx No.
-
Kms Kms
2 3
Unit Price
0
Location/ Remarks
S. No.
Item Details
G 1 2 3
33 kV Line Bay Extension at EHV station
H
11 kV Line : New Feeder/ Feeder Bifurcation
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
-
Nos Nos Nos
Sub Total
0 6.500
0
0
Kms
1
New feeder / Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
2.300
5.857
Kms
Sub Total
6.500
13.471
Ann-HT_11
For feeder seperation to interlink Solan to Subathu feeder to Slaughter House feeder to Guga Madi Subathu feeder.
13.471
Kms
2 3 I 1
Location/ Remarks
2.300
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
2 3
-
Kms Kms Kms
Sub Total Arial Bunched Cable J i) HT Kms 1 New HT spur with AB Cable 95 mm sq on 9 Mtr long S/T Poles
0
3.144
Ann-HT_12
0.000
0.000
-
-
9.066
-
Ann-HTAB_11
Kms Kms
Sub Total
0
0.000
0.000
ii) LT 1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles.
2
Recond. 3 phase LT Line with AB Cable 120 mm sq
-
Kms
2.300
Kms
6.195 4.753
10.932
Kms
Sub Total Total K
0 0
UG Cable i) HT Kms
2.300 2.300
10.932 10.932
Ann-LTAB_11 Ann-LTAB_12
Ravidasspura, Talona, Bharti & Thari.
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Annx No.
Kms Kms
Sub Total
0
0
Reference
0
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
ii) LT Kms Kms Kms
Sub Total Total L
0 0
0 0
0 0
0
0
0
11 KV Bay Extension Kms Kms Kms
Sub Total M 1 2 3
Installation of Distribution Transformer
15 -
Nos.
11/0.4 kV, 63 KVA SS 11/0.4 kV, 100 KVA SS
2 1 3
Nos. Nos.
11/0.4 kV, 250 KVA SS
Sub Total N 1 2 2 3 4
Capacity enhancement of LT sub-station
O
LT Line : New Feeder/ Feeder Bifurcation
1
New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
15
25 KVA to 63 KVA
Nos.
25 KVA to 100 KVA 50/63 KVA to 100 KVA
Nos.
100 KVA to 250 KVA 250 KVA to 400 KVA
Nos. Nos.
1 -
Sub Total
1 0 24.000
Kms
2.736 3.086 4.497
6.172 4.497 10.669
1.146 1.525 1.402 2.622 8.241
1.146 1.402 2.548
2 -
4.669
P
LT Line : Augmentation/Reconductoring
1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
24.000
0.000 -
Kms Kms Kms
Sub Total
0
0.000
Ann-DT_11 Ann-DT_11
Thari-II & Ravidass Pura.
Ann-DT_12 Ann-DT_12
Shanti Niketan
Ann-DT_12 Ann-DT_12 Ann-DT_12
Kashmiri Mohalla.
Ann-LT_12
0.000
Kms Kms
Sub Total
-
Ann-DT_11
2.016
0.000
Ann-LT_13
Near Upper Subathu
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
Capacitor Bank
Q
Nos. Nos. Nos.
Sub Total HVDS 1-Ø 11/0.230 kV, 16 kVA SS
R 1 2
0
0 1
Nos. Nos. Nos.
Sub Total
0
0 1.279
1.279
Ann-HVDS
MainBazar Subathu
1.279
1
Metering
S
Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
established under R-APDRP. Nos. iii) Boundary meters for ring fencing of Non-RAPDRP Towns with population more than 5000 Nos. iv) AMR for feeders, Distribution transformer and high load consumers Nos. 1 Metering-Feeder
Metering- DT Metering- HT Modem Consumers for existing un-metered connections, replacement of faulty meters & electro-mechanical meters vi) Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories 2 3 4 v)
Nos.
1
Nos. Nos. Nos.
15 5 0
Nos.
T 1
Solar Panel with Net metering
5
1.227
Ann-MT_FD
Per unit cost includes modem cost also.
0.195
0.195
Ann-MT
Per unit cost includes modem cost also.
0.975
Ann-MT As per RAPDRP
0.195 .
1
0.055
0.055
2200
1699
0.017
28.883
2221
1707
25 KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity)
1
1.227
Ann-MT
Nos.
Sub Total Provisioning of solar panel
1
KWe KWe
31.335
0.798
19.950
As per PFC
Electrical Sub-Division Office Subathu, Bus Stand, PHC, Guga Madi & Army Complex.
S. No.
Item Details
Unit
Net-Meters
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
Nos. Nos.
vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
25.000
19.950
0
0
0
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F) v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker
0
Nos.
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
Sub Total V
Others
Sub Total Grand Total Note: Unit price and Total Cost are inclusive of all taxes and duties
Reference Annx No.
Nos.
Sub Total U
Existing/ Current Position
0.00 90.18
Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Arki Town
Estimated Project Cost - Bill of Quantities
For R-APDRP Towns (Separate BOQ sheet to be furnished for each town) Bill of Quantities S. No.
Item Details
A 1 2 3
33/11 KV S/S : New
B 1 2 3
33/11 KV S/S : Additional Transformer
Unit
Nos
Existing/ Current Position
Qty proposed under IPDS
1
Cost proposed under IPDS
Rs. Lac
Rs. Lac
1
0
0
0
0
0
Nos. Nos. Nos.
Sub Total C 33/11 KV S/S : Transformer capacity enhancement
Nos.
Sub Total D 1 2 3
Renovation & Modernisation of 33/11 kV SS
E 1 2 3
New 33 KV new feeders/Bifurcation of feeders:
0
0
Nos. Nos.
0
-
Nos.
Sub Total
0 Kms Kms
0
3.00
33 KV feeders Reconductoring/Augmentation
3.00
0 -
Kms
Sub Total F
-
Nos. Nos.
1 2 3
0
Reference Annx No.
-
Nos Nos.
Sub Total
Unit Price
0
Location/ Remarks
S. No.
Item Details
Unit
Existing/ Current Position
Qty proposed under IPDS
Sub Total
Cost proposed under IPDS
Rs. Lac
Rs. Lac
0
0
Reference Annx No.
-
Kms Kms Kms
1 2 3
Unit Price
0
Location/ Remarks
S. No.
Item Details
Unit
G 1 2 3
33 kV Line Bay Extension at EHV station
H
11 kV Line : New Feeder/ Feeder Bifurcation
1
New feeder / Spur line for New DTRs with AAAC 7/4.26 mm sq conductor on 9 Mtr S/T Poles.
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
-
Nos
2 3
0 Kms
9.140
0 -
0 5.857
9.140
-
Ann-HT_11
0.000
Kms Kms
Sub Total
0.000
11 kV Line : Augmentation/Reconductoring Re-conductoring of HT Line from ACSR 20/30/50 mm sq to AAAC 7/4.26 mm sq conductor.
2 3
2.500
Kms Kms
3.144
0
7.860
Ann-HT_12
Spur Arki-I, Arki-II, Arki-III & 6 Pole structure Arki to 250 KVA SS Arki Hospital.
7.860
Kms
Sub Total J
Qty proposed under IPDS
Nos Nos
Sub Total
I 1
Existing/ Current Position
2.500
Arial Bunched Cable i) HT 1 New HT spur with AB Cable 95 mm sq on 9 Mtr long S/T Poles
2.300
Kms
9.066
20.852
Ann-HTAB_11
Near HPSEBL Division Office, Near SDM Office & Lakshey Pubic School (Arki ).
Kms Kms
Sub Total
0
2.300
20.852
ii) LT 1
New 3 phase LT Line with AB Cable 120 mm sq on 8 Mtr S/T Poles.
2
Recond. 3 phase LT Line with AB Cable 120 mm sq
-
Kms
5.675
Kms
6.195 4.753
26.973
Kms
Sub Total Total K
UG Cable
0 0
5.675 7.975
26.973 47.825
Ann-LTAB_11 Ann-LTAB_12
Forest Colony, Gahar-I, Arki Hospital, Arki -I, Arki -II & Arki -III.
S. No.
Item Details
Unit
i) HT Kms Kms Kms
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
Location/ Remarks
S. No.
Item Details
Unit
Sub Total
Existing/ Current Position
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Reference Annx No.
0
0
0
0 0
0 0
0 0
0
0
0
Location/ Remarks
ii) LT Kms Kms Kms
Sub Total Total L
11 KV Bay Extension Kms Kms Kms
Sub Total M 1
Installation of Distribution Transformer
2
11/0.4 kV, 100 KVA SS
3
11/0.4 kV, 250 KVA SS
10
11/0.4 kV, 63 KVA SS
Nos.
Nos.
Sub Total
10
N 1 2 3
Capacity enhancement of LT sub-station 25 KVA to 100 KVA 50/63 KVA to 100 KVA
Nos.
4
100 KVA to 250 KVA
Nos.
5
250 KVA to 400 KVA
25 KVA to 63 KVA
1
2.736
3.086
Ann-DT_11
Near HPSEBL Division Office
2
4.497
8.994
Ann-DT_11
Near SDM Office & Near Lakshya Public School Arki.
3
3 0 5.675
LT Line : New Feeder/ Feeder Bifurcation New LT line with AAAC 7/3.15 mm sq conductor on 8 Mtr long S/T Poles.
Kms Kms Kms
Ann-DT_11
3.086
1
Nos.
-
1
-
Nos.
Sub Total O
-
Nos.
12.080 1.146 1.525 1.402
1.525 -
Ann-DT_12 Ann-DT_12 Ann-DT_12
Telephone Exchange Arki
2.622
7.866
Ann-DT_12
Housing Board Colony (Arki), Arki-II, Arki-III & ArkiIII.
8.241
9.391
4
1.450
4.669
6.770 -
Ann-DT_12
Ann-LT_12
Near HPSEBL Division Office, Near SDM Office & Lakshey Pubic School (Arki ).
S. No.
Item Details
Unit
Sub Total
Existing/ Current Position 5.675
Qty proposed under IPDS 1.450
Unit Price Rs. Lac
Cost proposed under IPDS Rs. Lac 6.770
Reference Annx No.
Location/ Remarks
S. No.
Item Details
Unit
P
LT Line : Augmentation/Reconductoring
1
Recond. of 3 phase LT Line from ACSR 30mm sq with AAAC 50 mm sq conductor.
Existing/ Current Position
Qty proposed under IPDS
-
Kms
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
2.016
Sub Total Q
Annx No. -
Location/ Remarks
Ann-LT_13
0
0.000
0.000
0
0
0
Kms Kms
Reference
Capacitor Bank Nos. Nos. Nos.
Sub Total R 1 2
HVDS 1-Ø 11/0.230 kV, 16 kVA SS
-
Nos. Nos.
1.279
0.000
Nos.
Sub Total S
0
Ann-HVDS
0
Metering Nos. i) Prepaid / smart meters in Govt. establishment ii) AMI, Smart meters in the towns where SCADA being
established under R-APDRP.
Nos.
iii) Boundary meters for ring fencing of Non-RAPDRP Towns with
population more than 5000 Nos. iv) AMR for feeders, Distribution transformer and high load consumers Nos. Nos. 1 Metering-Feeder 2 Metering- DT
Nos.
Nos. 3 Metering- HT Nos. 4 Modem v) Consumers for existing un-metered connections, replacement
of faulty meters & electro-mechanical meters Nos. vi) Installation of Pillar Box for relocation of meters outside the premises of consumers including associated cables and accessories Nos. Sub Total
-
1.227
-
Ann-MT_FD
-
0.195
-
Ann-MT
10
8
0.195
1.560
Ann-MT
. -
0.055
3305
2106
0.017
3315
2114
35.802
37.362
As per RAPDRP Ann-MT
Per unit cost includes modem cost also.
S. No.
Item Details
Unit
Qty proposed under IPDS
Unit Price
Cost proposed under IPDS
Rs. Lac
Rs. Lac
Solar Panel with Net metering
KWe
Location 2 ……………. /( Capacity) Location 3 ……………. /( Capacity) Net-Meters
KWe KWe
40
0.798
31.920
Nos.
Sub Total
0
40
31.920
Sub Total
0
0
0
Sub Total
0
0
0
RMU,Sectionaliser, Auto reclosures, FPI etc. i) 33 kV Line : Installation of switchable breaker/switches ii) 33 kV Line : Installation of commnuicable/non-communicable FPIs (O/C&E/F)
Nos. Nos.
iii) 11 kV Line : Installation of RMUs/Sectionaliser alongwith aux power supply to operate sw/breaker.
Nos.
iv) 11 kV Line :- Installation of communicable/non communicable FPIs ( O/C,E/F)
Nos.
v) 11 kV Line : Installation of switchable breakers alongwith aux power supply to operate sw/breaker vi) Installation of remote operable switches for breaker/switches operation for Distribution Transformer alongwith aux power supply to operate sw/breaker
Nos.
Nos.
vii) Installation of remote operable switches for breaker/switches operation for cap bank alongwith aux power supply to operate sw/breaker . Nos.
V
Reference Annx No.
Location/ Remarks
As per PFC
SDM Office (Arki), Govt Hospital, PWD Rest House, under construction 33/11 kV SS, Govt. College Arki & Lautru Mahadev.
Provisioning of solar panel
T
U
Existing/ Current Position
Others
S. No.
Item Details
Unit
Grand Total Note: Unit price and Total Cost are inclusive of all taxes and duties
Existing/ Current Position
Qty proposed under IPDS
Unit Price Rs. Lac
Cost proposed under IPDS Rs. Lac 153.21
Reference Annx No.
Location/ Remarks
POWER FINANCE CORPORATION LTD. Detail Project Report
Annexure-1
Project Benefits: a. Reduction in AT&C loss Implementation of the project will facilitate to achieve Utility level AT&C Loss reduction trajectory as per Annexure-III of IPDS Guidelines is shown below: Base Year: AT&C Loss for FY 2012-13 FY 15-16 FY 16-17 FY 17-18 FY 18-19 FY 19-20 FY 20-21 FY 21-22 b.
% % % % % % % %
9.53% 12.50% 11.50% 10.50% 10.00% 10.00% 10.00% 10.00%
Other intangible benefit shall be as follows: . Accurate & reliable energy aacounting on sustainable basis. . Better accountability at all level. . Improve the reliability of the power supply. . 24x7 power supply for consumers in urban area. . Reduction of Losses to meet AT&C loss reduction trajectory. . Providing elctricity access to all urban house hold. . Improvement in network planning . Improvement in quality of supply like voltage level, PF etc. . Prompt and effective solution to the consumer queries / grievances. Line loss reduction: With strengthening of network, conductor resistance will be reduced, resulting reduction in cu loss. Ensuring better accounting: With metering of all nodal points, the energy accounting & auditing will be improved, resulting better administrative action: Better voltage profile: With strenthening of network & improvement in PF, tail end voltage will be imroved & reactive current will be reduced resulting improvement of quality of power & better consumer satisfaction.. Decrease in the DT failure: With addition of DT & enhancement of DT capacity the load on DT will be reduced, resulting decrease in DT failure & improvement in reliability. Curbing the theft/ pilferage/ and unaccounted usage: With ABC, HVDS, meter pillar boxes & proper consumer metering, theft / piferage & unaccounted usages will be minimised.
POWER FINANCE CORPORATION LTD. Detail Project Report Project area asset detail
Annexure-2
Details of EHV Sub-stations feeding project area EHV Transformer Details SN
Name of EHV Substation
1
Jabal Jamrot
2
Parwanoo
3
Katha Baddi
4
Davni
5
Nalagarh
6
Solan Saproon
Voltage Ratio 220/132 220/132 132/33 66/11 66/11 220/33 66/11 66/33 66/11 132/33 132/66
Rating (MVA)
Nos.
Capacity (MVA)
160/200 80/100 16 20 20 31.5 20 20 20 3x16.665 1x25/31.5
1 1 1 2 4 1 2 2 2 3 1
200 100 16 40 80 31.5 40 40 40 49.995 31.5
Maximum Demand (MVA) 188 80 10 27 70 28 22 35 30 60 36
Details of 33/11 Sub-stations feeding project area SN
Name of Substation
Voltage Ratio
1 2
Kunihar Garkhal
33/11 33/11
3
Subathu
33/11
4
Kather
33/11
HV Transformer Details Rating (MVA) Nos. 6.3 2 6.3 2 3.15 1 2.5 1 10 3
Maximum Demand Capacity (MVA) MVA 5.27 12.6 12.6 12
MVAR 5.85 2.6
5.65
5.12
5.68
30
30
33.33
Details of connection from EHV to 33/11 or 66/11 Sub-stations feeding project area SN
1
2
From EHV Substation
132/66/33 KV Sub-Station Solan Saproon
220/132/33 KV Sub-Station Jabal Jamrot
To 33/11 or 66/11 S/S 33/11KV SS Garkhal 33/11 KV SS Kather
Name of 33KV feeder
Length of feeder
Type of conductor
Average Demand (MVA)
Peak Demand (MVA)
Solan-Garkhal Feeder Solan-Kaher Feeder
16.50 4.00
6/1/4.72 30/7/2.59
10 26
12 30
66/11 KV SS- Parwanoo
Solan-Panchkula Feeder
31.80
Daughter (0.875 mm)
12
16
33/11 KV SS Subathu
Jabal Jamrot - Subathu Feeder
12.40
6/1/4.72
4.10
5.12
33/11 KV SS Kunihar
Jabal Jamrot - Kunihar Feeder
3.00
7/4.26
4.50
5.27
Details of interconnection of 33/11 KV Sub-stations feeding project area Sl. No.
From 33/11 S/S
To 33/11 KV S/S
Name of 33KV feeder
Length of feeder
Type of conductor
Average Demand (MVA)
Peak Demand (MVA)
-----Not Applicable-----
Details of 11 KV feeders emanating from 33/11 or 66/11 KV Sub-stations feeding project area 33/11 of 66/11 KV Name & Capacity of Power Demand Sl. No. From Name of 11 KV feeder Type of conductor Peak S/S Transformer (MVA) Feeder-3 1
66/11 KV
Dabni, 2x20 MVA
0.1
4.76
Distribution Transformer Details* Capacity Rating (KVA) Nos. (KVA) 1*100+1*63+1*25 3 188 HT METERING CONSUMERS
19
63
1
Feeder-11
0.1
4.76
HT METERING CONSUMERS
39
Feeder-13 Feeder-15
0.1 0.1
0.57 0.20
3*100+6*63+17*25 3*250+7*100+1*63
26 11
63
1103 1513
2
66/11 KV
Parwanoo, 2x20MVA
Parwanoo-I
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
3.81
5*250+6*400+1*63 0
12
4280
Parwanoo-II
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
5.53
1*25+1*100+15*25 0+2*400+ 1*630
20
5305
Parwanoo-III
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.52
9
1613
Parwanoo-IV Gabriel
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm 6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
3.05 2.29
1*63+3*100+ 5*250 100 250 1200
2 1 1
200 250 1200
11KV Kasauli
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
4.38
1*100+9*250+ 4*400
14
3950
Water supply
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
3.81
14*25+16*63+7*10 0+3*250+ 4*400+1*630
45
5038
Cosmo Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.33
1250
1
1250
Parwanoo-V
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.91
2*100+3*250+4*40 0
9
2550
Khadeen Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.91
1*25+1*63+1*100+ 3*250+3*400+1*63 0
10
2768
Dharampur-I
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
2.36
16*25+2*50+16*63 +1* 100+ 6*200+4*250+5*31 5+5*400+ 2*1000
66
9383
Dharampur-II
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.33
26*25+1*50+20*63 +26*100+3*250+1* 300+9*315+1*500
87
8945
3
33/11KV
Garkhal, 2x6.3 MVA
1.14
35*25+20*63+5*10 0+1*200+ 1*250+1*315+1*10 00
64
4400
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.22
10*25+14*63+12*1 00+4*250+ 1*315+1*630
42
4277
Kasauli
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.76
2*63+8*100+ 2*250+1*300
13
1726
Tiron Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
1.07
8*25+1*50+ 11*63+7*100+ 1*250
28
1893
Radar Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.27
2*63+1*100+ 2*250
5
726
CRI Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.38
2*63+4*100+ 2*250+1*400+2*75 0
11
2926
CRI New Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.42
1500
1
1500
MES Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.02
25
1
25
Jabli Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.42
3*63+3*100+ 2*250
8
989
Kot Beja Feeder
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
0.76
7*25+11*63+ 3*100+6*250
27
2668
Dharampur-III
6/1/3.35, 6/1/2.11, 7/3.81, 7/3.15mm
Water Supply
4
33/11 KV
Kunihar, 2x6.3 MVA
Arki Feeder
AAAC 7/3.81 sq.mm
2.286
31*25+25*63+ 11*100+5*250
72
4700
5
33/11 KV
Subathu, 1x3.15 +1x 2.5
Subathu
AAAC 7/3.15
5.12
1*25+1*63+ 1*100+3*250
6
938
6
33/11 KV
Solan-I
AAAC 7/4.26
3.43
3*100+1*200+ 14*250+3*400+2*6 30
23
6460
Solan - II
AAAC 7/4.26
5.2
2*25+9*63+8*100+ 1*200+13*250+4*4 00+1*630
38
7097
Solan - III
AAAC 7/4.26
3.73
3*100+11*250+ 9*400
23
6650
Solan - IV
AAAC 7/4.26
2.52
1*63+4*100+7*250 +2*400
14
3013
Lavi Ghat
185 mm Sq/ 7/3.81
0.95
8*25+10*63+6*100 +2*200+1*400
27
2230
Chambaghat
AAAC 7/4.26
4.5
7*25+3*63+11*100 +3*200+7*250+1*4 00+2*500
34
5214
Water Supply
AAAC 7/4.26
3.53
24*25+13*63+11*1 00+3*250+4*630
55
5789
Himachal Conductor
AAAC 7/4.26
5.94
4*25+11*63+14*10 0+34*250+1*315+2 *400
66
11808
Rajgarh feeder Sarahan Feeder
AAAC 7/4.26 AAAC 7/4.26
1.54 2.12
Kandaghat Feeder
AAAC 7/3.81 sq.mm
1.65
Kather, 3 x 10 MVA
Feeding ourside town area
Details of 11 KV feeders emanating from EHV Sub-stations feeding project area Sl. No. From EHV Substation
Name & Capacity of Power Transformer
Name of 11 KV feeder
Demand Type of conductor Peak (MVA)
Distribution Transformer Details* Rating (KVA)
Nos.
Feeder-1
0.1
1.75
HT Metering Consumers
1
Feeder-2
0.1
4.19
1*630+ 1*250 + 1*100 + 1*63 + 1*25
5
Capacity (KVA)
1068
1 Katha 220/66 KV 3*100 MVA, 66/11 4*20 MVA, 220/33 KV 1*25/31.5 MVA
HT Metering Consumers 15
1
Katha
220/66 KV 3*100 MVA, 66/11 4*20 MVA, 220/33 KV 1*25/31.5 MVA
Feeder-3
0.1
3.16
2*400+1*250+5*10 0+2*63
10
HT Metering Consumers
30
Feeder-4
0.1
1.68
HT Metering Consumers
2
Feeder-5
0.1
3.32
HT Metering Consumers
7
Feeder-6
0.1
2.59
2*100+1*63+2*25
5
HT Metering Consumers
12
HT Metering Consumers
2
1*400+2*250+2*10 0+4*63+3*25
12
HT Metering Consumers
40
2*630+1*400+9*25 0+5*100
17
HT Metering Consumers
7
2*630+5*400+8*25 0+25*100+5*63+7* 25
52
HT Metering Consumers
51
2*100
2
HT Metering Consumers
9
1*400+9*250+9*10 0+6*63+4*25
29
HT Metering Consumers
51
2*630+2*400+2*10 0+1*25
7
Feeder-7
0.1
1.37
Feeder-9
0.1
4.00
Feeder-10
Feeder-11
Feeder-12
Feeder-13
Feeder-14
0.1
0.1
0.1
0.1
0.1
3.20
4.76
1.33
4.27
1.11
1676
313
1427
4410
8250
200
4028
2285
220/66
Feeder-16
0.1
6.59
HT Metering Consumers
18
Feeder-17
0.1
0.65
HT Metering Consumers
1
1*630+3*100
4
HT Metering Consumers
29
1*250+1*100
2
Feeder-18
2
66/33/11 KV Nalagarh
0.1
2.13
Feeder-19
0.1
2.29
HT Metering Consumers
16
Feeder-20
0.1
0.04
1*100+1*25 2*630+1*250
2 2
Feeder-21
0.1
4.88
HT Metering Consumers
87
Feeder-22
0.1
4.61
HT Metering Consumers
84
1*400+1*250
2
930
350
125 1510
650
Feeder-23
0.1
5.34
HT Metering Consumers
59
Feeder-28
0.1
0.19
2*100+1*63
3
263
MIDC feeder
AAAC 7/4.26 & ACSR 6/1/3.35
2.4
1*25+2*63+5*100+ 4*250+1*400
13
2051
Nalagarh feeder
AAAC 7/4.26 & ACSR 6/1/3.35
1.15
2*63+5*100+7*250 +1*400+1*630
16
3406
2x20 MVA
* Note:- Out of 1635 DTRs only 575 DTRs feeds statutory towns (i.e. Solan, Baddi, Subathu, Kausali, Nalagarh, Arki,Parwanoo & Dagshai)
Annex-HT_11 ** Abstract of Cost for New 11 kV H.T.Line with AAAC 7/4.26 mm / ACSR 6/1/4.72 mm sq Conductor ** Amount Sr. Ref: DS CDDescription Qty. Rate Unit AAAC 7/4.26 ACSR 6/1/4.72 2014-15 No. mm sq
mm sq.
Each
114564 11556
114564 11556
P-8 P-8
353
Each
2824
2824
P-8
4
1,202
Each
4808
4808
P-8
Prov. C.I.X-arm for double pole str size 1500 x 100 x 50mm.
4
752
Each
3008
3008
P-8
Prov. C.I.X-arm size 1500 x 100 x 50mm for Single Pole.
8
752
Each
6016
6016
P-8
7
Prov. A.I.X-Bracing set for double pole str (1500x100x 50mm) + (2700x50X50mm) each ( 2 nos per set ) complete with Full clamps,cutting & wastage etc.
2
1,977
Set
3954
3954
P-8
8
Prov. 11 kV Disc Insulator set (Cleaves and Tong) helically formed fitting
12
1,168
Set
14016
1 2
Prov. Steel tublur Pole 9 mtr long. RCC Muff
3
Prov. A.I.Knee-bracing set 2(750 x 50 x 50 x 6 mm. ) for single pole
4
12
9547
Each
12
963
8
Prov. C.I.X-arm for double pole str size 2400 x 100 x 50mm for Disc Insulators.
5 6
14016
P-8
9
Prov. M.S. Flat 50 x 8mm for Staple for dead str.
12
63
Each
756
756
P-8
10
Prov. 11 kv Pin Insulator with Pin Hellically formed fitting.
36
110
Each
3960
3960
P-8
11
Prov. H.T. stay set complete i/c Guy assembly/Stay Wire
13
1,106
Set
14378
14378
P-8
12
Prov. Coil earthing complete set.
2
552
Set
1104
1104
P-8
13
Prov. Gaurding across the road as per REC Construction Standard A - I.= 26 kg / km line.
26.000
62
kg
1612
1612
P-8
14
Prov. 11 KV Danger plate
10
110
Each
1100
1100
P-8
15
Prov. G.I.Wire No.8 SWG for earth
105
62
kg
6510
6510
P-8
16
Prov. M.S. Nuts & Bolts off size-16 mm Dia = 25 kg / Km line.
25.000
81
kg
2025
2025
P-8
17
Prov. M.S. Flat 50 x 6 mm for top clamp for single pole
8
65
Each
520
520
P-8
30
65
kg
1950
1950
P-8
16 10
63
Each Each
1008 300
1008 300
P-30
30
5
141
Ltr
705
705
P-8 P-66
18 19 20
Prov. Barbed wire. Prov. M.S. Flat 50 x 6 mm for back clamp for X-arm. Prov. M.S. Eye hook with nut.
21
Prov. Alluminum Paint for Steel items
22
Prov. AAAC Conductor 7/4.26 mm i/c 3% cutting,wastage & sagging.
3.090
55,698
km
172107
-
23
Prov. ACSR Conductor 6/1/4.72 mm i/c 3% cutting,wastage & sagging.
3.090
64,380
km
-
198934
368781
395608 11868
Sub-Total :-- Material (A+B) CHARGES :--
P-15
22
Add 3% Contingencies
11063
23
Add 3% Storage charges
11063
11868
24
Add Erection charges
1.000
96525
km
96525
96525
P-54
25
Add Transportation charges Add Electrical Inspection Fees.
1.000 1.000
26145
km km
26145 200
26145 200
P-10
513778 71929
542215 75910
26
TOTAL :- Material + Charges Central taxes @ 14 %
200
Grand Total Say Rs. In Lac
585707
618125
5.857
6.181
Annex-HT_12 Abstract of Cost of Re-Conductoring of Existing 11 kV H.T Line from ACSR 6/1/3.35 , 6/1/2.59 mm & 6/1/2.11 mm to AAAC 7/4.26 mm2 Conductor / Km Line Sr. Description No.
Qty.
Rate
Unit
Amount
Ref: DS CostData 2014-15
1
Prov. Steel Tubular pole 9mtr long with steel cap / base plate.
4
9547
Each
38188
P-8
2
Prov. RCC muff .
4
963
Each
3852
P-8
3
Prov. AAAC Conductor 7/4.26mm i/c 3% cutting,wastage & sagging.
3.090
55,698
km
172107
P-66
4
Prov. C.I.X-arm for double pole str size 2400 x 100 x 50mm for GO.Switch , D.O.Fuses & Disc Insulators.
2
1,202
Each
2404
P-8
5
Prov. C.I.X-arm for double pole str size 1500 x 100 x 50mm.
2
752
Each
1504
P-8
6
Prov. C.I.X-arm size 1500 x 100 x 50mm for Single Pole.
2
752
Each
1504
P-8
7
Prov. MSAI-X-Arm 50x50x6x2800mm for earth /Gaurding.
1
659
Each
659
P-30
1
1,977
Set
1977
P-8
8
9
Prov. A.I.X-Bracing set for double pole str (1500x100x 50mm) + (2700x50X50mm) each ( 2 nos per set ) complete with Full clamps,cutting & wastage etc. Prov. A.I.Knee-bracing set 2(750 x 50 x 50 x 6 mm. ) for single pole
2
353
Each
706
P-8
Prov. M.S. Flat 50 x 8mm for top clamp 10 for single pole
2
65
Each
130
P-8
Prov. M.S. Flat 50 x 8mm for back 11 clamp for X-arm.
2
63
Each
126
P-30
12 Prov. M.S. Flat 50 x 8mm for Staple
6
63
Each
378
P-8
Prov. M.S. Nuts & Bolts off size = 25 kg 13 / Km line.
15.000
81
kg
1215
P-8
14 Prov. Barbed wire.
4
65
kg
260
P-8
15 Prov. M.S. Eye hook with nut. Prov. 11 kv Disc Insulator complete set with ball clevis / eye -socket,dead end 16 clamp , Bend Stapple & P.G.clamps etc. Prov. Dead end clamp for AAAC 17 Conductor 7/4.26 mm
4
30
Each
120
P-15
6
1,168
Set
7008
P-8
12
500
Set
6000
Stock Issue rates
Prov. 11 kv Pin Insulatorwitn Pin 18 Hellically formed fitting.
6
110
Each
660
P-8
Prov. H.T. stay set complete i/c Guy 19 assembly/Stay Wire
4
1,106
Set
4424
P-8
20 Prov. Coil earthing complete set.
1
552
Set
552
P-8
21 Prov. 11 KV Danger plate
3
110
Each
330
P-8
22 Prov. Alluminum Paint.
4
141
Ltr
564
P-8
Add Sundreies & misc itmes i.s. Primer ,Alluminium Paint & other items 23 to complete the job = Rs 1000-00 / Km line.
Sub-Total :-- Material
L.S.
1000
245668
CHARGES :-25 Add Contingency @ 3%
7370
26
Erection charges
a
Add Erection charges for Single pole str.
3
3,174
Each
9522
P-48
b
Add Erection charges for Double pole str.
1
6,245
Each
6245
P-48-49
c
Add Erection charges for fixing of Jumpering.
4
318
Set
1272
P-49
d
Add Erection charges for Earthing
1
639
Each
639
P-49
e
Add Erection charges for Stay Set
4
1,184
Each
4736
P-49
f
Add Erection charges for laying of AAAC 7/4.26 mm Conductor
1.030
19720
km
20312
33 kV Cost Data P- 68
1.030
13073
km
13465
P-10
1.000
200
km
200
27 Transportation charges a
Add Transportation charges for reconductoring of 11 kv H.T.Line @ 50% on Rs. 26145.00
28 Add Electrical Inspection Fees.
TOTAL :- Material + Charges Less cost of dismantled material ( As per Ann.-HT_12(a)
309429 33597
Sub- Total Central taxes @ 14 %
Grand Total Say Rs.
275832 38616 314448 3.144
Lac only
Annex-HT_12(a) Sr. Description No.
Qty.
Rate
Unit
Amount
Ref. Page No. as per Cost-Data for 2014-15
1 Less the credit of ACSR Condutor / G.I.Wire ( Per Km line ) (a) ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC 7/2.00MM/AAC 7/2.21 mm (20mm2)
0.250
22536
P/km
5634
P- 44
(b) ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm (30mm2)
0.250
33162
P/km
8291
P- 44
(c) ACSR Conductor 6/1/3.35mm ( 50MM^2).)/ AAAC 7/3.15 mm (50mm2)
0.500
55443
P/km
27722
P- 44
15
275
Each
4125
P- 42
(d)Dead end clamp for ACSR 6/1/2.11/6/1/2.59 mm Cond. on Stock Issue Rates = Rs. 500 x @ 55% = 110.00
TOTAL :- 1 45772 2 Dismentaling charges for ACSR Condutor /G.I. Wire. ( 11kv Line / km) (a) ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC 7/2.00MM/AAC 7/2.21 mm (20mm2) (b) ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm (c) ACSR Conductor 6/1/3.35mm ( 50MM^2)./AAAC 7/3.15mm
0.250
8751
P/km
2188
P- 53
0.250
13041
P/km
3260
P- 53
0.500
13041
P/km
6521
P- 53
(d)Dead end clamp for all type cond. @ 5% on Rs. TOTAL :- 2
4125
Net Cost to be credit = Item No. 1 - 2
206
12175 33597
Annex-HTAB_11 ** Abstract of Cost for New 22kV /11kV H.T Line with AB Cable -95 mm2 on Single Pole Structure ** Sr. Description No.
Qty.
Rate
Unit
Amount
Ref: DS CD2014-15
1
Prov. Steel Tubular Pole 9 mtr long.
15
9547
Each
143205
P-12
2
RCC Muff Prov. H.T. stay set complete i/c Guy assembly/Stay Wire
15
963
Each
14445
P-12
4
1,076
Set
4304
P-11
4
Prov. Barbed wire.
14
65
kg
910
P-11
5
Prov. 11 KV Danger plate
10
110
Each
1100
P-11
6
Prov. Alluminum Paint for Steel items
3
141
Ltr
423
P-11
7
Prov. Anchoring Assembly .
4
285
Each
1140
P-11
8
Prov. Suspension Assembly.
21
227
Each
4767
P-11
9
Façade Hooks
15
75
Each
1125
P-11
10
Aerial Bunched Cable - 95 mm2
1.030
504545
km
519681
P-11
12
Sub-Total :-- Material
13
CHARGES :--
14
Add 3% Contingencies
20733
15
Add 3% Storage charges
20733
16
Add Erection charges
1.000
43505
km
43505
P-11
17
Add Transportation charges
1.000
19029
km
19029
P-11
18
Add Electrical Inspection Fees.
1.000
200
km
200
3
691100
TOTAL :- Material + Charges
795300
Central taxes @ 14 %
111342
Grand Total
906642
Say Rs. In Lac
9.066
Annex-LTAB_11 New 3 Phase L.T. Line with AB Cable 120 mm2 on 8 Mtr long Steel Tublar Pole for different Distribution SS:/ Km Sr. No.
Description
Qty.
Rate
Unit
Amount
Ref: DS CD 201415
A
MATERIAL :-
1
Prov. Steel Tubular Pole 8 mtr long.
15
7,224
Each
108360
P-11
2
RCC Muff
15
729
Each
10935
P-11
3
LT AB Cable 3x120+70+16 mm2 LT AB Cable
1.030
297,291
P/Km
306210
P-70
3
Suspension and dead end clamp
15
389.00
Each
5835
As per Award Una Town
4
Distribution box
15
1820.00
Each
27300
As per Award Una Town
5
L.T. Stay-Set complete in all respect.
1
978
Set
978
P-23
6
Add Sundreies & misc itmes i.e. Primer & other items to complete the job.
1
500
500
B 1 2 3 4
Sub-Total - Material CHARGES :-Add Contingency @ 3% on Rs. Add Storage @ 3% on Rs. Add Erection Charges @ 50% of Rs. 88465.00 (Cost. 3-Phase L.T.Line ) Add Transportation charges @ 50% of Rs. 22998-00 (Cost. 3-Phase L.T.Line )
460118 13804 13804 Km
1.000
44233
44233
P-18
Km
1.000
11499
11499
P-28
TOTAL :- Material + Charges Central taxes @ 14 %
543457 76084
Grand Total Say Rs. In Lac
619541 6.195
Annex-LTAB_12 Augmentation/ Re-Cond of 3 Phase L.T. Line with AB Cable 120 mm on 8 Mtr long Steel Tublar Pole for different Distribution SS:/km 2
Sr. No. A MATERIAL :1 2
Description
Qty.
Rate
Unit
Amount
Ref: DS CD2014-15
5 5
7,224 729
Each Each
36120 3645
P-11 P-11
1.030
297,291
P/Km
306210
P-70
3
Prov. Steel Tubular Pole 8 mtr long. RCC Muff LT AB Cable 3x120+70 +16mm2 LT AB Cable
3
Suspension and dead end clamp
12
389.00
Each
4668
As per Award Una Town
4
Distribution box
15
1820.00
Each
27300
As per Award Una Town
5
1
978
Set
978
P-23
6
L.T. Stay-Set complete in all respect. Add Sundreies & misc itmes i.e. Primer & other items to complete the job. Sub-Total - Material
1
500
500
B 1
CHARGES :-Add Contingency @ 3% on Rs.
2
Add Storage @ 3% on Rs. Add Erection Charges @ 50% of Rs. 88465.00(Cost. 3Km Phase L.T.Line ) Add Transportation charges @ 50% of Rs. 22998-00(Cost. Km 3-Phase L.T.Line ) TOTAL :- Material + Charges Less the Cost if Dismentaled Material as per Annex- LTAB_12(a)
3 4
379421 7861 7861 1.000
44233
44233
P-18
1.000
11499
11499
P-28
450875 -33915
Sub-Total Central taxes @ 14 %
416960
58374 475334
Grand Total Say Rs. In Lac
4.753
Annex-LTAB_12(a)
** Abstract of Cost for Dismentalled Material. ** Sr. Description No. 1 Less the credit of ACSR Condutor / G.I.Wire ( Per Km line ) ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC a) 7/2.00MM/AAC 7/2.21 mm (20mm2) [7512x4=30048] ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm b) (30mm2) ACSR Conductor 6/1/3.35mm ( 50MM^2).)/ AAAC 7/3.15 mm c) (50mm2) TOTAL :- 1 2 a) b) c) 3
Qty.
Rate
Unit
Amount
Ref: DS CD2014-15
1.000
30048
P/km
30048
P-44
1.000
44216
P/km
44216
P-44
1.000
73924
P/km
73924 148188
P- 44
11668
P/km
11668
P-53
17388
P/km
17388
P-53
17388
P/km
17388
P-53
Dismentaling charges for ACSR Condutor /G.I. Wire. ( 11kv Line / km) ACSR Conductor 6/1/2.11mm ( 25MM^2)/ AAAC 1.000 7/2.00MM/AAC 7/2.21 mm (20mm2) [2917*4=11668] ACSR Conductor 6/1/2.59mm ( 30MM^2) / AAAC 7/2.50mm 1.000 [4347*4=17388] ACSR Conductor 6/1/3.35mm ( 50MM^2)./AAAC 7/3.15mm 1.000 [4347*4=17388] TOTAL :- 2 Net Cost = Item No. 1 - 2
Average cost of Dismentled Material to be credited
46444 101744 33915
Annex-DT_11
COST DATA FOR 11/0.4 kV DISTRIBUTION SUB - STATION (Rs) Sr DESCRIPTION No 1 2 1 11/0.4 kV Distribution Transformer (Ordinary)
3
4
RATE Rs. 5
I) 25 kVA II) 63 kVA III) 100 kVA IV) 250 kVA
1 1 1 1
No No No No
47413 83317 110636 184742
V) 400 KVA
1
No
VI) 630 KVA
1
No
2 2 4
No No No
9547 963 1403
19094 1926 5612
19094 1926 5612
19094 1926 5612
19094 1926 5612
19094 1926 5612
19094 1926 5612
P-30 P-30 P-30
2
No
230
230
230
230
230
230
230
P-30
2 2 1 4 1 1 1 3 3 2 12 3
No No L/S No No Set. Set. No Set. Set. Kg. Set.
659 96 1046 659 4796 1797 516 1168 728 63 2803
1318 192 4184 659 4796 1797 1548 3504 1456 756 8409
1318 192 4184 659 4796 1797 1548 3504 1456 756 8409
1318 192 4184 659 4796 1797 1548 3504 1456 756 8409
1318 192 20000 4184 659 4796 1797 1548 3504 1456 756 8409
20000 4184 659 4796 1797 1548 3504 1456 756 8409
20000 4184 659 4796 1797 1548 3504 1456 756 8409
P-30 P-30 P-30 P-30 P-30 P-30 P-30 P-30 P-30 P-30 P-30 P-30
1 1 1 1.00
Set. Set. Set. Set.
9940 10561 9944 30871
9940
2 S/T Pole 9Mtr. W/L200 kg 3 RCC Muff of 2000 mm length 4 C.I. X-Arm (2800X100X50 mm) for Transformer base Main Channel C.I (460X100X50 mm) for supporting Main Channel of 5 Transformer
6 Transformer Belting I) A.I (2800X50X50 mm) II) A.I (460X35X35 mm) 7 Transformer Bed ( 1.2X1.5X1.5 M) i/c fencing 8 C.I. for Fuse Unit/AB Switch (2800X75X40 mm) 9 A.I X Arm for Lightning Arrestor (2800X50X50 mm) 10 G.O.Switch 11 D.O.Fuse 12 Lightning Arrestors 13 Disc Insulator Fitting 14 Stay Set complete 15 Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set) 16 Pipe Earthing 17 LT Distribution Panel Box with MCCB I) 25 kVA II) 63 kVA III) 100 kVA IV) 250 kVA
QTY UNIT
25 KVA 6
ORDINARY 63 KVA 100 KVA 250 KVA 400 KVA 7 8 9 10
83317 110636 184742
As per Chief Engineer (MM) P.O.-2014
459397
As per Chief 640146 Engineer (MM) P.O.-2014
P-30 P-30 P-30 P-30
10561 9944 30871
Stock Issue Rate
179370
VI) 630 KVA
179370
Half Clamp (M.S. Flat 50X6 mm) M.S. Nuts and Bolts (Off Sizes) G.I. Thimble Lead-Tin Solder (60:40) Solder Flux Danger Plate Barbed Wire LT Cable (3.5 Core) i) 25 mm2 ii) 50 mm2 iii) 95 mm2 iv) 185 mm2 v) XLPE 300 mm2 v)XLPE 400 mm2
25 Energy Meter (3-Phase, 4-Wire) i) 50 A CT Type ii) 100 A CT Type iii) 200 A CT Type iv) 400 A CT Type v) 1000 A CT Type
Ref. of Cost Data 2014-15 P-30 P-30 P-30 P-30
47413
V) 400 KVA
18 19 20 21 22 23 24 24
630 KVA 11
15 10.00 16 1 1.00 1.00 15.00
No. Kg. No Kg. Tin No Kg.
63 81 34 899 108 110 65
945 810 544 674 108 110 975
10 10 10 10 10 10
Mtr Mtr Mtr Mtr Mtr Mtr
57 98 176 194 1085 1317
570
1.00 1.00 1.00 1.00
No No No No
13645 14105 12746 13280
1.00
No
20000
4.00
Ltr Sub-Total
945 810 544 674 108 110 975
945 810 544 674 108 110 975
945 810 544 674 108 110 975
Stock Issue Rate
945 810 544 674 108 110 975
P-30 P-30 P-30 P-30 P-30 P-31 P-31
13170
P-31 P-31 P-31 P-31 P-69 P-69
945 810 544 674 108 110 975
980 1760 1940 10850
P-31 P-31 P-31 P-31
-
-
As per Chief Engineer (MM) P.O.-2014
564 118134
564 155069
564 182551
564 297764
564 728318
564 911387
P-31
27 Erection Charges as per Sub-Head-C (P-50)
57473
57473
57473
57473
57473
57473
P-31
28 Transportation Charges as per Statement-VI (P-59)
17090
18152
19744
21336
21336
21336
P-31
26 Aluminium Paint.
29 Other Charges I) Contingency Charges @3% ii) Storage Charges @3%
141
3544 4652 5477 8933 21850 27342 3544 4652 5477 8933 21850 27342 Sub-Total 199785.31 239998.41 270721.33 394439.11 850826.35 1044879.49
Central taxes @14% 27969.94 33599.78 37900.99 55221.47 119115.69 146283.13 Grand Total 227755.25 273598.18 308622.31 449660.58 969942.03 1191162.61 2.278 2.736 3.086 4.497 9.699 11.912 Say Rs.
Annex-DT_12 Special cost data for Augmentation of 11/0.4 kV Distribution Transformers Sr. Description No. A Detail of dismentled Material
Qty.
1
11/.4 KV distribution Transformer
1
2
Less dismentalment charges @ 5%
B
Detail of New Material
1
11/.4 KV distribution transformer as per RGGVY cost data 2014-15
Unit
Each
Total (A)
2 3
Remarks /DS CD 2014-15
Amount 25 KVA
63 KVA
100 KVA
250 KVA
400 KVA
630 KVA
14983
26328
34961
58378
145169
201646
749
1316
1748
2919
7258
10082
14233
25012
33213
55460
137911
191564
Each
L.T. distribution panel box with MCCB
47413
83317
110636
184742
459397
640146
CP-30 & As per Chief Engineer (MM) P.O.-2014
9940
10561
9944
30871
179370
179370
CP-30 & Stock Issue rate
-
-
-
-
-
-
-
CP-31
-
-
CP-31
L.T. cable 3.5 core 25 mm2
10
mtr
50 mm2
10
mtr
980
95 mm2
10
mtr
-
185 mm2
10
mtr
240 mm2
10
mtr
XLPE 400 mm2
10
mtr
1
Each
3a Electronic energy Tri-Vector meter Sub-Total 4
570
1760
CP-31 1940
CP-31 (Dist.CD-2013-14 with 4.68% hike) CP-78
4522 13170 -
-
-
-
-
-
57923
94858
122340
217553
643289
832686
5792
9486
12234
21755
64329
83269
10% Erection Charges 5
5% Transportation charges
2896
4743
6117
10878
32164
41634
6
Other charges i.e. 3% contingency, 3% storage
3475
5691
7340
13053
38597
49961
70086
114778
148031
263239
778379
1007550
Sub-Total
Central Grand Total Taxes@14% a
Aug. of 25 to 63 KVA=
Say Rs. (in Lac)
100545
14076
114621
1.146
Say Rs. In Lac
152529
1.525
Say Rs. In Lac
Aug. of 25 to 100 KVA=
133798
18732
c
Aug. of 63 to 100 KVA=
123019
17223
140242
1.402
Say Rs. In Lac
d
Aug. of 63 to 250 KVA=
238227
33352
271579
2.716
Say Rs. In Lac
e
Aug. of 100 to 250 KVA=
230026
32204
262230
2.622
Say Rs. In Lac
Aug. of 100 to 400 KVA=
745166
104323
849489
8.495
Say Rs. In Lac
824128
8.241
Say Rs. In Lac
991389
9.914
Say Rs. In Lac
b
f
Assume remaining 25% useful life
g
Aug. of 250 to 400 KVA=
722919
101209
h
Aug. of 400 KVA to 630 KVA=
869639
121750
Annex-LT_12 COST DATA FOR 3-Ø L.T. LINE PER KM WITH AAAC.(Rs.) AAAC Sr. No.
20 mm2 1
ACSR
PCC Pole
Description
2
30 mm2
S\T.Pole 50 mm2
3
4
5
62420
62420
1
Material Cost as per Item No-4 (P-15)
62420
2
AAAC 20 mm2 4.12 km
46451
20 mm2 6
30 mm2 7
155762
S\T.Pole 50 mm2
30 mm2
50 mm2
8
155762
155762
Remarks / DS CD 2014-15
9
155762
155762
46451
P-18
P-18
3
AAAC 30 mm2 4.12 km,
79051
79051
P-18
4
AAAC 50 mm2 4.12 km
5
ACSR 30 mm2 4.12 km
125479
125479
P-18
82808
P-16 138440
6
P-16
ACSR 50 mm2 4.12 km Sub-Total
108871
141471
187899
202213
234813
281241
238570
294202
5
Erection Charges as per Statement-II (P-55)
69306
79066
91450
66321
76081
88465
88465
88465
P-18
6
Transportation Charges as per Statement-VI (P-59)
32560
32560
32560
22998
22998
22998
22998
22998
P-18
7
Other Charges I) Contingency Charges @3%
3266
4244
5637
6066
7044
8437
7157
8826
ii) Storage Charges @3%
3266
4244
5637
6066
7044
8437
7157
8826
217270
261586
323183
303665
347981
409579
364348
423317
Central taxes @ 14 %
30418
36622
45246
42513
48717
57341
51009
59264
Grand Total
247687
298208
368429
346178
396699
466920
415356
482582
2.477
2.982
3.684
3.462
3.967
4.669
4.154
4.826
Grand Total
Say Rs
Annex-LT_13 Abstract of Cost for Re-Conductoring of Existing 3-Phase.LT.Line from ACSR 30 mm2 with AAAC 50mm2 Conductor. / Km S. Description of item No. Prov.AAAC Cond.7/3.15mm ( 50mm^2 ) i/c 1 3% cutting, wastage & sagging. 2 Steel Tublar poles 8 mtr long. 3 RCC Muff 4 LT Stay set complete
Qty
Unit
4.12
P/km
30,456.00
125479.00
P-66
2 2 3
Each Each Set
7,224.00 729.00 600.00
14448.00
P-15
1458.00
P-15
1800.00
P-15
10.00 224.00 52.00 63.00
120.00
P-15
448.00
P-15
624.00
P-15
126.00
P-15
16.00 15.00 30.00 9.00 118.00
48.00
P-15
45.00
P-15
60.00
P-15
18.00
P-15
236.00
P-15
552.00
552.00
P-15
22.00 81.00
44.00
P-15
324.00
P-15
5 6 7 8 9
Shackle Insulators C.I.X-ARM (600*75*40MM) D-Iron X-Arm Clamps Egg Insulator
12 2 12 2 3
Each Each Each Each Each
10 11 12 13
Straple for egg insulator Eye Hooks/Bolts G.I.Reel Kit-Kat
3 2 2 2
Each Each Each Each
14 Coil Earthing 15 Spool Tie
1 2
Each Each
16 M.S.Nuts & Bolts off size 17 All. Paint
4 1
Kg Each
Rate (Rs.)
Amount (Rs.) Ref. DS CD2014-15
P-15
141.00 141.00
Sub-Total :- 1 to 17 Add Contingency @ 3%, storage @ 3% Erection charges for laying of Condutor 50mm^2. ( i ) 50mm^2 = 4 wire X 9740 = 38960 ( ii) Erection charges except Conductor for 2 pole str= 1763x2 str = 3526 Add Transportation charges @ 5% on Sr.No.18 Sub-TOTAL
145971.00 8758.00
Amount to be credited as per Annex-LT_13(a) Sub- TOTAL Central taxes@14% GRAND TOTAL
-27712.00 176802.00 24752.28 201554.28
38960.00
P-49
3526.00
P-50
7299.00 204514.00
Say Rs. (In Lac)
2.016
Annex-LT_13(a) S. Description of item No. 1
Qty
Unit
Rate (Rs.)
Less the credit of ACSR Condutor/G.I.Wire.as per REC (a) ACSR Conductor 6/1/2.59mm/AAAC 7/2.50 ( 30MM^2). = 4.08 km x11054=45100-00
1.000
P/km
45100.00
TOTAL :- 1 2
Amount (Rs.) Ref. DS CD2014-15
45100.00
P-44
45100.00
Dismentaling charges for ACSR Condutor/G.I.Wire.as per (a) ACSR Conductor 6/1/2.59mm/AAAC 7/2.50 ( 30MM^2).= 4 Ph x 4347=17388-00
1.000
P/km
17388.00
17388.00
P-53
TOTAL :- 2 Net Cost to be credit = Item No. 1-2
17388.00
27712.00
Annex-HVDS
COST DATA FOR 1-Ø 11/0.230 kV SUB STATION (ORDINARY) (Rs.) Sr. No. 1 1
Description
Qty.
Unit
Rate
2
5
6
7
6.3 KVA 8
Amount 10. KVA 16 KVA 9 10
Ref: DS CD 2014-15 11
11/0.23 kV 1-Ø Distribution Transformer (Ordinary) I) 6.3 kVA (ORD)
1 No
21641
21641
ii) 10 kVA
1 No
42024
III)16 kVA
1 No
52362
2
S/T Pole 9 Mtr. W/L 200 kg
1 No
9547
9547
3
RCC Muff of 2000 mm length
1 No
963
4
C.I.X Arm (1500X100X50 mm)
1 No
5
C.I.X Arm (1500X100X50 mm) for D.O. Switch
6
P-35 42024
P-35 52362
P-35
9547
9547
P-35
963
963
963
P-35
752
752
752
752
P-35
1 No
752
752
752
752
P-35
A.I Bracing Set 2X(750X50X50 mm)
1 No
353
353
353
353
P-35
7
G.O. Switch Double Pole
1 No
4796
4796
4796
4796
P-35
8
Lightning Arrestor
2 No
516
1032
1032
1032
P-35
9
Disc Insulator with fitting
2 No
1168
2336
2336
2336
P-35
10 Stay Set Complete
1 No
728
728
728
728
P-35
11 Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)
6 Kg.
63
378
378
378
P-35
12 Pipe Earthing
3 No
2803
8409
8409
8409
P-35
13 Cu.Thimble
6 No
41
246
246
246
P-35
14 Lead-Tin Solder (60:40)
0.5 No
899
450
450
450
P-35
15 Solder Flux
0.5 No
108
54
54
54
P-35
16 PVC Cable T/C 16MM2
10 No
22
220
220
220
P-35
17 Danger Plate
1 No
110
110
110
110
P-35
18 Barbed Wire
4 Kg.
65
260
260
260
P-35
19 Aluminium Paint for Painting of S/Stn Struc.
2 No
141
282
282
282
P-35
20 1-Phase Energy Meter 10-60 A
2 No
751
1502
1502
1502
P-35
54811
75194
85532
28737
28737
28737
P-35
8545
8545
8545
P-35
I) Contingency Charges @3%
1644
2256
2566
ii) Storage Charges @3%
1644
2256
2566
Sub-Total
21 Erection charges as per S/Head-C (P-50)@ 50% 22 Transportation Charges as per statement-VI (P-59) @ 50% 23 Other Charges
Grand Total
95381
116987
127945
Say Rs. (in Lac)
0.954
1.170
1.279
Annex-MT_FD SPECIAL COST DATA FOR RING FENCING METER (CT-PT Unit)
No
5 4921
4921
Ref. DS CD2014-15 7 P-68
1
No
23572
23572
P-71
3 S/T Pole 9Mtr. W/L200 kg
2
No
9547
19094
P-32
4 RCC Muff of 2000 mm length
2
No
963
1926
P-32
5 C.I. X-Arm (2800X100X50 mm) for Transformer base
4
No
1403
5612
P-32
2
No
230
460
P-32
I) A.I (2800X50X50 mm)
2
No
659
1318
P-32
II) A.I (460X35X35 mm)
2
No
96
192
P-32
8 A.I X Arm for Lightning Arrestor (2800X50X50 mm)
1
No
659
659
P-32
9 G.O.Switch 400A
1
Set.
4796
4796
P-32
10 D.O.Fuse
1
Set.
1797
1797
P-32
11 Lightning Arrestors
3
No
516
1548
P-32
12 Disc Insulator Fitting
3
Set.
1168
3504
P-32
13 Stay Set complete
2
Set.
728
1456
P-32
14 Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)
12
Kg.
63
756
P-32
15 Pipe Earthing
3
Set.
2803
8409
P-32
16 Meter box
1
Set.
2000
2000
MR
17 Half Clamp (M.S. Flat 50X6 mm)
15
No.
63
945
P-32
18 M.S. Nuts and Bolts (Off Sizes)
10
Kg.
81
810
P-32
19 G.I. Thimble
16
No
34
544
P-32
20 G.I.pipe 1½ dia
4
Mtr
250
1000
MR
21 AAAC 7/4.26 mm conductor for jumpering
20
Mtr
56
1120
P-66
22 Barbed Wire
15
Kg.
65
975
P-32
23 Multi core cable
20
Mtr
50
1000
MR
24 Aluminium Paint.
4
Ltr
141
Sr. Description 1
Qty.
Rate
3
4
1
2 Providing CT-PT combined unit
1
2
Unit
Providing 3 Phase 110-1& 5A meter
Amount 6
Main Channel 6 C.I (460X100X50 mm) for supporting Main Channel of 7 CT PT Belting
25 Sub-Total Erection Charges @ 10 % on Material Cost Transportation Charges @ 5% on Material Cost Other Charges I) Contingency Charges @3% ii) Storage Charges @3%
564 88978 8898 4449 2669 2669
Grand Total
107663
Central Tax@14% Grand Total Say Rs. (In Lac)
15073 122736 1.227
Annex-MT MT_11
Cost Data for LT CT Operated TVM for DTR/Feeder. Description
Sr. No. 1 Providing 3P4W CT Operated LT TVM as per RGGVY Cost data 2014-15.
Unit Each
Qty. 1
Rate 14105.00
Total
Amount
Cost Data Ref 14105.00 P-31 14105.00
Add 3% storage, 3% contingency & 5% transportation charges= 11%.
1551.55
Add 10% labour charges. Total Central Tax@14% Grand Total Say Rs.
1410.5 17067.05 2389.39 19456.44 0.195
Annex-MT_12 Consumer Metering (Single Phase). Sr. Description Unit Qty. No. 1 Providing ACSP energy meter as per RGGVY Cost data 2014-15. Each 1
Rate
Amount
730.00
Cost Data Ref 730.00 P-37
2
1- Phase MCB 16 A Plug-in-type
Each
1
115.00
115.00
P-37
3 4
Meter Box Provd. Sunderies & Misc. such as screws etc.
Each
1
355.00
355.00 50.00 1250.00
P-37
Total Add 3% storage, 3% contingency & 5% transportation charges= 11%.
137.5
Add 10% labour charges. Total Central Tax@14% Grand Total Say Rs.
125 1512.50 211.75 1724.25 0.017 Only
Annex-MT_13 Consumer Metering (Three Phase). Description Unit Qty. Sr. No. 1 Providing ACSP energy meter as per RGGVY Cost data 2014-15. Each 1 2 3 4
3- Phase MCB 40 A Plug-in-type Meter Box Provd. Sunderies & Misc. such as screws etc.
Each Each
1 1
Rate 3624.00 432.00 546.00
Total Add 3% storage, 3% contingency & 5% transportation charges= 11%.
Amount
Cost Data Ref 3624.00 P-38 432.00 546.00 50.00 4652.00
P-38 P-38
511.72
Add 10% labour charges. Total Central Tax@14% Grand Total Say Rs.
465.2 5628.92 788.05 6416.97 0.064 Only