Hawar Highway Improvement (from Jaw to Al Dour) No.

Item Description

Unit

Quantity

Amount BD.

Rate

CLASS A: GENERAL ITEMS Contractual requirements A1

Performance bond (clause (.1)

sum

A2

Insurance of the Works (as clause 21.1

sum

A3

Third party insurance (as clause 23.1)

sum

A4

Insurance against damage to persons and property

sum

3,000.000 1,500.000 1,000.000 1,000.000

3,000.000

(as clause 24.2) Specified requirements Accommodation for the Engineer's staff A5

Establishment and removal of offices as described

sum

A6

Maintenance of offices

wks

26

75.000

1,950.000

Services for the Engineer's staff A7

Establishment and removal of telephones/fax as

200.000

sum

specification clause 104 A8

Maintenance of telephones/fax

wks

26

25.000

650.000

Equipment for use by the Engineer staff A9

Establishment and removal of office equipments as

2,500.000

sum

described A10

Maintenance of office equipments

A11

Establishment and removal of surveying equipment as

wks

26

25.000

650.000

A12

Maintenance of surveying equipment

wks

A13

Testing of material

sum

A14

Testing of the works

sum

500.000 390.000 1,000.000 2,000.000

sum

1,000.000

described

sum 26

15.000

Temporary works A15

Installation and removal of traffic diversions as described

A16

Maintenance of traffic diversions.

wks

26

A17

Establishment and removal of plastic Water-filled traffic barrier

sum

1

25

650.000 10,000.000

in accordance with the "interim specification for plastic water filled traffic barrier"

Class A 29

To Collection BD

Page 1 of 31

30,990.000

Hawar Highway Improvement (from Jaw to Al Dour)

Number A18

Item Description Maintenance of plastic water-filled traffic barriers as

Unit

Quantity

wk

20.000

Amount BD 520.000

25.000

1,000.000 650.000

Rate

26

described A19

Establishment and rtemoval of traffic safety control as described sum

A20

maintenanace of traffoc safety and control as described

A21

Establishment and removal of mobile electronic varaible

wk

message sign (VMS) equipment as described

sum

A22

maintenance of VMS eqipment

wks

A23

Establishment and removal of mobile electronic directional

26

23,600.000 26

25.000

650.000

26

25.000

7,900.000 650.000

arrows (DA) equipment as described

sum

A24

Maintenance of DA equipment

wks

A25

Establishment and removal of sign boards as described

nr

2

400.000

A26

Maintenance of signj boards

wk

26

20.000

800.000 520.000

Photographs A27

Provision of digital camera for use on site as described

nr

1

250.000

A28

Set of selected digital photographs as described

nr

100

3.000

250.000 300.000

As built drawings A29

Provide a set of "As-Built" drawings upon

600.000

sum

completion of the contract. For this purpose the contractor will be supplied with a set of negatives of all the drawings for his use and the final set to the Engineer shall show the co-ordinates of all the ducts, the depth, the size and the number of pipes, whether they are utilised, and all other information relating to the road positioning and heights, etc. NOTE : The issue of the Certificate of Practical Completion will depend on the satisfactory supply of the above drawings to the Engineer

Class A 30

To Collection BD

Page 2 of 31

37,440.000

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Rate

Amount BD.

Provisional sums Daywork A30

Labour

1,000.000 100.000 1,000.000 100.000 1,000.000 100.000

sum

Percentage adjustment to provisional sum for day work labour A31

materials

sum

Percentage adjustment to provisional sum for day work material A32

Plant

sum

Percentage adjustment to provisional sum for day work plant

Other Provisional Sums

sum

35,000.000 25,000.000 12,500.000 20,000.000

sum

20,000.000

sum

25,000.000

A33

Allow for the relocation of existing street lighting posts

sum

A34

Relocation of overhead electrical cables

sum

Other cahrges and profits

%

A35

Relocation of underground electrical cables

A36

Earthwork in connection with relocationna nd diversion of water supply

A37

Allow for the relocation of telephone cable netwrok by Batelco

Class A 31

To Collection BD

Page 3 of 31

140,800.000

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From Page 29 30 31

30,990.000 37,440.000 140,800.000

Class A - Total to Grand Summary

209,230.000

32

Page 4 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS B : GROUND INVESTIGATION Trial pits and trenches Number in material other than rock B1

Minimum plan area at bottom of excavation nr

50

10.000

500.000

5m ; maximum depth not exceeding 1m

nr

50

16.000

800.000

Minimum plan area at bottom of excavation 1m2; maximum

nr

50

20.000

1,000.000

nr

50

50.000

2,500.000

minimum plan area at bottom of excavation 1m2; maximum depth nr

50

40.000

2,000.000

m

50

50.000

2,500.000

1 m2 ; maximum depth not exceeding 1m B2

B3

Maximum length at bottom of excavation

depth 1-2m B4

Maximum length at bottom of excavation 5m maximum depth 1m - 2m number in material which includes rock

B5

1-2m B6

Maximum length at bottom of excavation 5m maximum depth 1m - 2m

B7

depth in material other than rock

m

300

15.000

4,500.000

B8

Depth in rock

m

200

35.000

7,000.000

B9

depth backfilled, selected excavated material

m

300

6.000

1,800.000

Class B

22,600.000

33

Page 5 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS B : GROUND INVESTIGATION 33

22,600.000

Class B

22,600.000

34

Page 6 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Amount BD.

Rate

CLASS D : DEMOLITION AND SITE CLEARANCE General clearance

D1

General site clearance

ha

9.00

50.000

450.000

m

280.00

1.500

420.000 50.000 72.000

Other structures Break out and remove from site D2

Existing precast concrete kerb; size 125mm x 250mm; including foundationn and backing

D3

Existing speed hump

nr

5.00

10.000

D4

Existing square concrete slabs

m2

36

2.000 60.00

5,460.000 -

Remove and relocate D5

Existing plam trees

nr

91

D6

Existing sign board (as directed by the S.O 5.50m clearance

nr

1

to be maintained) D7

xisting electricity/lighting poles

nr

49

60.00

2,940.000

D8

Existing temporaray fence

m

200

40.00

8,000.000

Remove and set aside for re-use D9

Paving blocks; 60mm thick

m2

32

2.00

D10

Paving blocks; 80mm thick

m2

795

2.50

64.000 1,987.500

m2

6020

3.00

18,060.000

nr

5

75.00

375.000

Remove form site D11

Existing garden / plants Pipeline (including any bed and surround) and disposal

D12

Gully and surround; includig sealing off 150mm pipe and backfilling with concrete

Class D 35

To Collection BD

Page 7 of 31

37,878.500

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS D: DEMOLITION AND SITE CLEARANCE 35

37,878.500

Class B

37,878.500

36

Page 8 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

Number

Item Description

Unit

Quantity

Rate

Amount BD.

Class E: Earth works Excavation for cuttings E1

Material other than top soil, rock or artificial hard material

m3

10797

0.700

E2

Rock

m3

550

10.000

E3

Asphalt exposed at the commencing surface

m3

373

4.000

7,557.900 5,500.000 1,492.000

m2

5100

0.250

1,275.000

Excavation ancillaries Preparation of excavated surfaces E4

Material other than top soil, rock or artificial hard material Disposal of excavated material

E5

Material other than top soil, rock or artificial hard material

m3

10797

0.600

E6

rock

m3

550

0.600

E7

asphalt

m3

373

0.600

6,478.200 330.000 223.800

m3

4850

6.000

29,100.000

m2

2630

0.900

2,367.000

m2

12574

1.600

20,118.400

m2

610

1.800

1,098.000

m2

15609

0.250

3,902.250

Filling Embanlment E8

imported dredged fill type B General

E9

Regulating type B; depth 150-200mm to stated depth or thickness imported crushed run in capping layer;

E10

thickness 200mm imported crushed run in capping layer; inclined at an angle of 10 to 45 degrees from the horizontal

E11

thickness 200mm Filling Ancillaries Trimming of filled surfaces

E12

material other than top soil, rock or artificial hard material

Class E 37

To Collection BD

Page 9 of 31

79,442.550

Hawar Highway Improvement (from Jaw to Al Dour)

Number E13

Item Description

Unit

Quantity

Rate

Amount BD.

Material other than top soil, rock or artificial m2

2288

0.350

800.800

hard material

m2

18837

0.250

Material other than top soil, rock or artificial

m2

4576

0.350

4,709.250 1,601.600

700

7.000

hard material; inclined at an angle of 10 to 45 degrees from the horizontal Preparation of formation in filled areas E14 E15

Material other than top soil, rock or artificial

hard material; inclined at an angle of 10 to 45 degrees from the horizontal Work in connectin with the service protection E16

Exacation of exposed services

m3

E17

Excavation to proposed services; in trenches

m3

690

8.000

E18

Disposalof excavated material

m3

1390

2.000

E19

Filling around exposed services with TYPE B material

m3

690

6.000

E20

Filling to cable/service protection; 50mm thik with fine sand

m2

659

1.200

E21

Filling to cable/service protection; 100mm thik with fine sand

m2

2335

2.400

E22

Provision of concrete; as specification clause 518

m3

727

40.000

E23

Placing of concrete as protection to service; bed not exceeding

m3

727

7.000

4,900.000 5,520.000 2,780.000 4,140.000 790.800 5,604.000 29,080.000 5,089.000

150mm thick

Class E 38

To Collection BD

Page 10 of 31

65,015.450

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From

CLASS E: EARTHWORKS

Page 37 38

79,442.550 65,015.450

144,458.000

39

Page 11 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS I : PIPE WORK - PIPES Unplasticised polyvinyl chloride (uPVC) pipes as specification clause 501.3 nominal bore 250mm I1

In trenches; depth not exceeding 1.5m

m

1606

15.000

24,090.000

m

48

60.000

2,880.000

m

1012

12.000

12,144.000

nominal bore 300-600mm 3way I2

In trenches; depth 1.5-2m Nominal bore 150mm

I3

In trenches; depth not exceeding 1.5m

Class K

To Collection BD

40

Page 12 of 31

39,114.000

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From

CLASS I: PIPE WORK - PIPES

Page

40

39,114.000

39,114.000

41

Page 13 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS J: PIPE WORK - FITTING AND VALVES Unplasticised polyvinyl chloride (uPVC) pipes as general specification clause 501.3 Bends JI

niminal bore 200mm

nr

10

12.000

120.000

nr

95

17.000

1,615.000

Junctions and branches J2

nominal bore 200mm

Class K

To Collection BD

42

Page 14 of 31

1,735.000

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From

CLASS J: PIPE WORK - FITTING AND VALVES

Page

42

1,735.000

1,735.000

43

Page 15 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

Number

Item Description

Unit

Quantity

Rate

Amount BD.

CLASS K: PIPE WORK - MANHOLE AND PIPE WORK ANCILLARIES Manhole (depth measured to invert level) In situ concrete chamber type 'D' as standard detail SD1.5 K1

depth not exceeding 1.5m

nr

41

300.000

K2

depth 1.5-2m

nr

1

375.000

K3

depth 2.-2.5m

nr

2

450.000

12,300.000 375.000 900.000

Soakaways (depth measured to top of base cover) in situ concrete depth 3.5 - 4m In situ concrete chamber type 'E' as standard detail SD1.6 including RTR liner depth 2 - 2.5m Soakaway (depth measured to top of base cover as standard detail SD 3.70) Brick K4

depth 1.5-2m

nr

1

700.000

K5

depth 2-2.5m

nr

1

750.000

K6

depth 2.5-3m

nr

1

800.000

K7

depth 3 - 3.5m

nr

1

850.000

K8

depth 3.5 - 4m

nr

1

900.000

700.000 750.000 800.000 850.000 900.000

nr

146

100.000

14,600.000

m

184

6.000

1,104.000 6,810.000 1,104.000

Gullies K9

Plastic with in-situ concrete surround as standard detail SD3.10 Ducts, uPVC pipe BS 3506(except class 'O') spigot and socket flexible joints in srevice ducts; as standard detail 5.06 & 5.07 Service duct 2 way 100mm pipes

K10

In trenches, depth not exceeding 1.5m service duct ; 4 way 150mm pipes

K11

In trenches, depth not exceeding 1.5m

m

454

15.000

K12

in trenches depth not exceeding 1.5m

m

48

23.000

Crossings High voltage cable K13

to be crossed by 4 x 150mm duct

nr

48

40.200

K14

to be crossed by 2 x 100mm duct

nr

19

24.000

Class K

To Collection BD

44

Page 16 of 31

1,929.600 456.000

43,578.600

Hawar Highway Improvement (from Jaw to Al Dour) Number

K15

Item Description

to be crossed by 6 x 150mm duct

Unit

Quantity

Rate

Amount BD.

nr

5

42.000

210.000 -

nr

72

7.000

504.000

Other pipework ancillaries K16

Duct marker blocks; precast concrete; stamp coded with duct type; as standard detail SRCD 5.08a

Class K

To Collection BD

45

Page 17 of 31

714.000

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From

CLASS K: PIPE WORK - MANHOLE AND

Page

PIPE WORK ANCILLARIES 44 45

43,578.600 714.000

44,292.600

46

Page 18 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Amount BD.

Rate

CLASS L : PIPE WORK - SUPPORTS AND PROTECTION, ANCILLARIES Extras to excavation and backfilling In manhole and other chambers L1

excavation of rock

m3

1986

12

23,832.000

10,896.000 2,944.000 1,728.000

Surrounds Imported granular material as General Specification Clause 504.2 and as Standard Details SD 3.1, SRCD 5.06, 5.07, 5.08 and 5.09 L2

to 4 way 150mm duct

m

454

24.000

L3

to 2 way 100mm duct

m

184

16.000

L4

to 6 way 150mm duct

m

48

36.000

Concrete class 20/20 as General Specification Clause 504.5 and Standard Details SD 3.1, SRCD 5.06, 5.07, 5.08 and 5.09 ; L5

to 4 way 150mm duct

m

512

60.000

L6

to 2 way 100mm duct

m

207

30.000

L7

to 6 way 150mm duct

m

54

80.000

Class L

To collection BD

47

Page 19 of 31

30,720.000 6,210.000 4,320.000

80,650.000

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From

CLASS L: SUPPORTS AND PROTECTION

Page

ANCILLARIES 47

80,650.000

80,650.000

48

Page 20 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Rate

Amount BD.

CLASS R : ROADS AND PAVINGS Sub - Bases Modified material 'A' (Road Base) material R1

depth 200mm

m2

6083

1.300

R2

Regulating Type; 100 - 150mm

m2

920

0.900

7,907.900 828.000

m2

4439

1.130

5,016.070

m2

10320

3.510

36,223.200

Type B dredged material R3

depth exceeding 300mm Sub-bases, flexible road bases and surfacing ; as General Specification Section 900 Asphalt base course type B28; imported aggregate

R4

depth 75mm Asphalt wearing course GW20 (TM5)

R5

depth 50mm

m2

35661

2.340

R6

Goefabric: poly felt type PGM 14

m2

3186

0.600

83,446.740 1,911.600

R7

Road oil sprayed on sub-base as described

m2

31840

0.150

4,776.000

R8

Tack coat sprayed on asphalt surface as described

m2

24141

0.200

4,828.200

R9

Removal of flexible surface by cold planning

m2

4262

35.000

149,170.000

305,608.540 Vertical saw cut asphalt R10

Depth exceeding 100mm and not exceeeding 150mm

m

2967

1.000

R11

Regulating course of asphalt type GW20 (TM5)

m3

441

47.000

R12

EXTRA OVER asphalt surfacing; any type (Including GW20

m2

386

0.800

2,967.000 20,727.000 308.800

nr

5

250.000

1,250.000

(TM5) and thickness; for laying by hand R13

Speed humps as standard detail SRCD 10.07; complete including yellow paint; for 7.5 metre carriageway

Class R

To collection BD

49

Page 21 of 31

319,360.510

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Rate

Amount BD.

Kerbs, channels and edgings as General Specification Clasue 1001 Precast concrete kerbs; half battered; 125 x 250mm; as standard detail SRCD 10.01 and 10.02 R14

straight or curved to radius exceding 12m

R15 R16

7.000

36,708.000

280

9.000

24

10.000

2,520.000 240.000

m

110

9.000

990.000

m

5244

curved to radius not exceeding 12m

m

dropped kerbs as standard detail SRCD 10.04, 10.05

m

and 10.06 Precast concrete kerbs; half battered 125 x 250mm, as standard detail SRCD 10.08, laid flat R17

straight or curved to radius exceeding 12m Precast concrete edgings 50 x 150mm; as standard detail SRCD 10.01 and SRCD 10.2

R18

staright or curved to radius exceeding 12m

m

1903

11.000

R19

curved to radius not exceeding 12m

m

417

15.000

20,933.000 6,255.000

m2

9533

1.100

10,486.300

m2

4439

1.500

6,658.500

m2

9533

6.000

57,198.000

m2

32

3.000

96.000

Light duty pavements Granular base type A R19

depth: 150mm Road base material

R21

depth 200mm Rectangular concrete paving blocks 200 x 100mm laid to herringbone pattern with unifrom joints; on and including 30mm sand bed Colour RED

R22

thickness 60mm Rectangular concrete paving blocks 200 x 100mm laid to herringbone pattern with unifrom joints; on and including 30mm sand bed; FROM PREVIOSLY SET ASIDE Colour RED

R23

thickness 60mm

Class R

To collection BD

50

Page 22 of 31

142,084.800

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Rate

Amount BD.

Ancillaries Traffic Singns 3

58.000

nr

5

48.000

nr

19

48.000

Code 5 : Keep Right; 600, 450 x 900mm

nr

15

68.000

R28

Code 6: Vehicle may pass either side 450x700mm

nr

7

65.000

R29

Code8: Turn Left/Right Chevron; 600 x 1800

nr

11

85.000

R30

Code 9: Turn Right; 600mm

nr

1

48.000

R31

Code 14: Bend to Right Ahead 900mm

nr

4

58.000

R32

Code 26: Double bend, first to right 900mm

nr

2

58.000

R33

Code 15: Pedestrian crossing ahead; 900mm

nr

2

58.000

R34

Code 16: Pedestrian Route; 600 x 600mm

nr

4

48.000

R35

Code 17: Traffic Signal Ahead; 1200 x 1200x 600mm

nr

6

120.000

R36

Code 18: Round about Ahead; 1200 & 1200 x 900mm

nr

2

135.000

R37

Code 19: Two Way Traffic: 900mm

nr

19

58.000

R38

Code 24: Maximum Speed Limit; 900mm

nr

1

58.000

R39

Code 29: Speed Humps Ahead; 900, 300 x 900 mm

nr

1

85.000

R40

Code 72: Road Name Sign; 900mm

nr

1

125.000

174.000 240.000 912.000 1,020.000 455.000 935.000 48.000 232.000 116.000 116.000 192.000 720.000 270.000 1,102.000 58.000 85.000 125.000

nr

5718

4.000

22,872.000 390.000 20.400

R24

Code 2: Give Way 900mm

nr

R25

Code 3 : No Entry; 600mm

R26

Code 4 - One - Way Traffic 500 x 650mm

R27

Surface marking non-reflective road studs R41

die-cast aluminium; as described Reflecting road studs

R42

ceramic road studs; as described

nr

300

1.300

R43

intermittent warning lines; 0.10m mm wide

m

48

0.425

Class R

To collection BD

51

Page 23 of 31

30,082.400

Hawar Highway Improvement (from Jaw to Al Dour) Number

R44

Item Description

Give way line at roundabout; broken line of 1m mark,1m

Unit Quantity

m

Rate

Amount BD.

18

0.850

15.300 20.400 156.825 63.750

gap and 0.20m wide R45

Broken line of 4.0m mark, 2.0m gap and width of 0.1m

m

48

0.425

R46

Intermittent center line

m

369

0.425

R47

Chevron lines; 100mm wide

m

150

0.425

Hand or machine applied white thermoplastic road markings R48

letters and shapes; arrows; as standard details drawing

nr

40

6.700

R49

bus lay by edge/line; broken ;lines of 1.0m mark, 1.0m gap

m

404

0.425

R50

Stop line solid line of 0.40m width mark up to

m

127

1.700

R51

Speed humps markings as per detail design

nr

5

53.000

m

5244

0.325

Paint to kerbs as described R52

to exposed faces of kerb; black & yellow

Class R

To collection BD

52

Page 24 of 31

268.000 171.700 215.900 265.000 1,704.300

2,881.175

Hawar Highway Improvement (from Jaw to Al Dour)

COLLETION

From Page 49 50 51 52

319,360.510 142,084.800 30,082.400 2,881.175

494,408.885

53

Page 25 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

Number

Item Description

Unit Quantity

Amount BD.

Rate

CLASS X : MISCELLANEOUS WORK Fences Metal Sfety Barriers X1

Open Box Beam safety barriers (OBB) DOUBLE SIDED

X2

Drainage to structures above ground

m

813

41

33,333.000

m

3422

3.000

10,266.000

nr

1

6000.000

6,000.000

nr

1

5800.000

5,800.000

nr

1

10000.000

10,000.000

nr

1

5000

5,000.000

nr

1

4500

4,500.000

nr

1

8000

8,000.000

excavate for drainage ditch; maximum depth not exceeding 400mm Others X3

Provision and laying of 1 x 600mm pipes culvert as drainage off let to SRCD 5.05; Maximum length not exceeding 24m

X4

Provision and laying of 1 x 600mm pipes culvert as drainage off let to SRCD 5.05; Maximum length not exceeding 22m

X5

Provision and laying of 3 x 600mm pipes culvert as drainage off let to SRCD 5.05; Maximum length not exceeding 45m

X6

Provision and laying of 1 x 300mm pipes culvert as drainage off let to SRCD 5.05; Maximum length not exceeding 18m

X7

Provision and laying of 1 x 450mm pipes culvert as drainage off let to SRCD 5.05; Maximum length not exceeding 15m Box Culvert

X8

Provide and place reinforced in situ concrete Class A

Class X Total to Grand Summary

82,899.000

54

Page 26 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Amount BD.

Rate

X9

Provide and place reinforced in situ concrete Class A

nr

1

7500

7,500.000

X10

Mortared rip rap; 300mm thick

m2

300

20

6,000.000

X11

Mortared rip rap; 150mm thick nominal size stone laid in full

m2

200

14.000

2,800.000

class 1 mortar bed

Class X Total to Grand Summary

16,300.000

55

Page 27 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

COLLECTION CLASS X: MISCELLANEOUS WORK From Page

54

82,899.000

From Page

55

16,300.000

Class Y Total to Grand Summary

99,199.000

56

Page 28 of 31

Hawar Highway Improvement (from Jaw to Al Dour) Number

Item Description

Unit Quantity

Rate

Amount BD.

CLASS Y : SEWER AND WATER MAIN RENOVATION AND ANCILLARY WORKS Existing manholes Adjust levels of matalwork to surface boxes, gullies and manholes, medium or heavy duty; in foot paths or carriage way asphalt surfacing metal work area 0.10 M2 Y1

raised not exceeding 150mm

nr

17

12.000

Y2

raised 150 to 300mm

nr

13

15.000

Y3

raised 300 to 450mm

nr

3

18.000

Y4

lowered not exceeding 150mm

nr

8

12.000

Y5

raised 150 to 300mm

nr

4

15.000

204.000 195.000 54.000 96.000 60.000

Class Y Total to Grand Summary

609.000

57

Page 29 of 31

Hawar Highway Improvement (from Jaw to Al Dour)

COLLECTION CLASS Y: From Page

57

609.000

Class Y Total to Grand Summary

609.000

58

Page 30 of 31

Hawar Highway Improvement (from Jaw to Al Dour) GRAND SUMMARY CLASS

DESCRIPTION

From Page

Amount BD.

CLASS A GENERAL ITEMS

32

209,230.000

CLASS B GROUND INVESTIGATION

34

22,600.000

CLASS D DEMOLITION & SITE CLEARANCE

36

37,878.500

CLASS E EARTH WORKS

39

144,458.000

CLASS I: PIPE WORK - PIPES

41

39,114.000

CLASS J PIPE WORK - FITTING AND VALVES

43

1,735.000

46

44,292.600

ANCILLARIES

48

80,650.000

CLASS R ROADS AND PAVINGS

53

494,408.885

CLASS X MISCELLANEOUS ITEMS

56

99,199.000

58

609.000 1,174,174.985

CLASS KPIPEWORK - MANHOLES & PIPEWORK ANCILLARIES CLASS L PIPEWORK - SUPPORT AND PROTECTION,

CLASS Y SEWER & WATER MAIN RENOVATION & ANCILLARY WORKS Sub - Total ADJUSTMENT ITEM Deduction in adjustment of the total of the Bill Of Quantities which shall be deemed to apply uniformly to all rates in the Bill Of Quantities for the purpose of valuations and variations. Note:- Provisional sums remain at their full value and are not affected by any adjustment shown here. Sub - Total

1,174,174.985

GENERAL CONTINGENCY ALLOWANCE Allow 10% for General Contingency Allowance , to be expended in whole

117,417.499

or in part as expressly directed in writing by the Engineer. TOTAL TO FORM OF TENDER

Page 31 of 31

1,291,592.484

Related Documents

Hawar Highway
May 2020 9
Highway Kart
June 2020 12
Shared Highway
May 2020 12
Highway 249
November 2019 31
Df Highway
November 2019 23
Highway 138
June 2020 1