DAFTAR SUMBER DATA D A E R A H

: :

SEWA

P E R A L A T AN

PASARAN BE BAS KOTA SEMARANG EDISI KEDUA 2012

NO.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

PERALATAN

Dump Truck 3 ton Dump Truck 5 ton Truk Bak Terbuka Truk Tanki Air Bulldozer Motor Grader Wheel Loader Excavator Crane Trailler Mesin Gilas Tandem 6 - 10 ton Mesin Gilas 3 roda 6 - 10 ton Mesin Gilas Roda Karet 8 - 10 ton Vibratory Roller Vibro roller 1 ton Water Pump Asphalt Sprayer Pick Up AMP Asphalt Finisher Concrete Vibrator Compressor Concrete Mixer Stamper Genset Alat Pengecat Marka

SATUAN

Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam Jam

MINIMUM (Rp)

HARGA MAKSIMUM (Rp)

170,000 195,000 145,000 135,000 205,000 160,000 160,000 160,000 135,000 190,000 135,000 110,000 150,000 150,000 85,000 50,000 70,000 65,000 1,600,000 190,000 75,000 90,000 75,000 50,000 180,000 70,000

185,000 200,000 150,000 140,000 220,000 170,000 175,000 175,000 150,000 200,000 150,000 125,000 170,000 165,000 90,000 65,000 75,000 75,000 1,750,000 200,000 80,000 100,000 80,000 60,000 190,000 80,000

KET.

DAFTAR SUMBER DATA D A E R A H

: :

UPAH PEKERJA PASARAN BE BAS KOTA SEMARANG EDISI KEDUA 2012 HARGA

NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

JENIS

Pekerja Mandor Tukang listrik Tukang kayu Kep. tk. kayu Tukang batu Kep. tk. batu Tukang besi Kep. tk. besi Tukang cat Kep. tk. cat Tukang plitur Tukang jalan Tukang gali Tukang masak aspal Tk. leideng Masinis Pemb. Masinis Penjaga api Penjaga malam

21 Sopir 22 Pembantu Sopir

413095359.xls

BAHAN

SATUAN Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr Hr

53

MINIMUM (Rp)

30,000 43,000 40,000 40,000 45,000 40,000 45,000 40,000 45,000 40,000 45,000 40,000 35,000 32,500 35,000 40,000 45,000 40,000 35,000 30,000 45,000 32,000

MAKSIMUM (Rp)

KET.

33,000 45,000 43,000 43,000 47,000 43,000 47,000 43,000 47,000 43,000 47,000 43,000 37,500 35,000 37,500 43,000 50,000 45,000 40,000 35,000 50,000 35,000

daftar upah tenaga kerja

DAFTAR SUMBER

HARGA

DATA

D A E R A H

SATUAN BAHAN

BANGUNAN

:

PASARAN

:

KOTA SEMARANG

BEBAS EDISI KEDUA 2012

HARGA NO.

I

J E N I S

BAHAN

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

DASAR

1 BATU KALI

2 KERIKIL

Bulat Utuh

m3

110,000

120,000

Bulat Belah

m3

120,000

130,000

Pecah

10/15

m3

140,000

145,000

Pecah

5/7

m3

140,000

150,000

Pecah

3/5

m3

145,000

155,000

Timbun

m3

85,000

90,000

Sawur / Koral

m3

115,000

120,000

Beton

0,5/1

m3

165,000

180,000

Beton

,1/2

m3

165,000

175,000

Beton

,2/3

m3

160,000

170,000

m3

115,000

120,000

Tras Giling

m3

190,000

205,000

3 BATU BATA

ex lokal

bh

400

450

4 PASIR

Urug

m3

75,000

85,000

Pasang

m3

125,000

140,000

Beton

m3

140,000

150,000

Padas

m3

45,000

50,000

Liat

m3

45,000

50,000

Pasang

m3

195,000

210,000

Semen Merah

m3

120,000

150,000

Holcim 40 kg

zak

42,000

42,500

Holcim 50 kg

zak

51,000

52,000

Cibinong 40 kg

zak

42,000

43,000

Cibinong 50 kg

zak

51,000

51,500

Semen Putih 40 kg

zak

57,000

65,000

Semen Putih 50 kg

zak

70,000

78,500

kg

9,000

10,000

Biasa

5 TANAH 6 KAPUR 7 PORTLAND CEMENT

Semen warna

II

BAHAN

PENUTUP ATAP

1 SIRAP

(100 lbr)

pak

140,000

150,000

2 GENTENG BETON

Genteng Beton Warna standard

bh

3,000

3,200

Genteng Beton Warna Special

bh

4,200

4,500

Genteng Beton Warna Khusus

bh

4,700

5,000

Kerpus Beton Warna Standard

bh

3,750

4,000

Kerpus Beton Warna Special

bh

4,500

4,750

Kerpus Beton Warna Khusus

bh

8,700

10,000

Vlaam

bh

1,050

1,200

Kodok

bh

1,300

1,500

Kodok Glasur

bh

2,500

2,700

Nok kerpus Kodok

bh

3,100

3,200

Nok kerpus Kodok Glasur

bh

6,500

7,000

Plentong super besar 18 bh/m2

bh

2,800

3,000

Nok kerpus plentong super

bh

6,750

7,000

3 GENTENG TANAH LIAT

KETERANGAN

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

4 GENTENG KACA Vlaam tebal 2 mm

bh

5,850

6,000

Vlaam tebal 3 mm

bh

5,750

8,000

Kodok tebal 2 mm

bh

5,500

6,000

Kodok tebal 3 mm

bh

6,000

7,000

. 200 cm X 102 cm X 5 mm

bh

67,000

70,000

. 250 cm X 102 cm X 5 mm

bh

80,000

82,000

. 225 cm X 102 cm X 5 mm

bh

73,500

76,000

. 200 cm X 102 cm X 6 mm

bh

55,000

58,000

. 225 cm X 102 cm X 6 mm

bh

62,500

63,000

. 250 cm X 102 cm X 6 mm

bh

66,500

71,000

bh

35,000

37,000

. 180 cm X 105 cm X 4 mm

bh

38,500

42,000

. 210 cm X 105 cm X 4 mm

bh

48,000

51,000

. 240 cm X 105 cm X 4 mm

bh

57,000

59,000

. 270 cm X 105 cm X 4 mm

bh

64,000

67,000

. 300 cm X 105 cm X 4 mm

bh

73,500

75,000

Onduline

95 cm x 200 cm x 3 mm

lbr

130,000

*) belum PPn

Ondovilla

40 cm x 106 cm x 3 mm

lbr

55,000

*) belum PPn

NOK

Jabes nok . Kerpus Genteng

bh

19,500

21,000

. Stel Besar

bh

36,000

45,000

. Paten Besar

bh

35,800

39,000

. Stel Besar

bh

37,500

41,500

. Patent Besar

bh

17,300

18,000

. Plat besar

bh

47,000

49,000

Onduline 50 cm x 90 cm x 3 mm

lbr

75,000

. 100cm X 100 cm X 3 mm

bh

11,000

12,000

. 100cm X 100 cm X 4 mm

bh

12,000

13,000

. 50 cm X 200 cm X 3 mm

bh

10,000

11,000

. 40 cm X 200 cm X 3 mm

bh

10,000

11,000

Gyproc unt dinding

120 cm x 240 cm x 12 mm

lbr

56,000

58,000 *) belum PPn

/ plafond

120 cm x 240 cm x 9 mm

lbr

45,000

47,000 *) belum PPn

180 X 92 cm

bh

55,000

60,000

200 X 92 cm

bh

60,000

70,000

250 X 92 cm

bh

65,000

72,000

180 X 105 cm

bh

40,000

42,000

210 X 105 cm

bh

45,000

46,000

250 X 105 cm

bh

49,000

52,000

BJLS 0,18 lebar 55 cm

m'

18,000

20,000

BJLS 0,20 lebar 55 cm

m'

23,000

27,000

BJLS 0,28 lebar 55 cm

m'

33,000

35,000

BJLS 0,30 lebar 55 cm

m'

38,000

40,000

BJLS 0,18 panjang 180 cm

lbr

55,000

57,000

BJLS 0,20 panjang 180 cm

lbr

57,000

60,000

BJLS 0,30 panjang 180 cm

lbr

65,000

67,000

BJLS 0,40 panjang 180 cm

lbr

73,000

75,000

Papan

m3

21,000,000

22,000,000

Balok/pesagen

m3

18,500,000

19,000,000

5 ASBES GELOMBANG BESAR

Asbes Gelombang Kecil . 150 cm X 105 cm X 4 mm

Nokstel gelombang harflex

*) belum PPn

6 ASBES PLAT

7 FIBRE GLASS (JABES)

8 SENG PLAT

9 SENG GELOMBANG

III . B A H A N K A Y U 1 JATI

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

m3

5,800,000

6,200,000

Balok/pesagen

m3

5,000,000

5,700,000

Papan

m3

4,500,000

4,800,000

Balok/pesagen

m3

4,500,000

4,600,000

Papan

m3

4,200,000

4,400,000

Balok/pesagen

m3

3,900,000

4,000,000

Papan

m3

850,000

1,000,000

Balok/pesagen

m3

750,000

850,000

Papan

m3

7,000,000

7,300,000

Balok/pesagen

m3

6,700,000

6,900,000

Sedang 8 x 10 x 400 cm

bt

17,000

18,000

Kecil 6 x 7 x 400 cm

bt

12,000

16,000

Besar 10 x 12 x 400 cm

bt

23,000

26,000

Kayu cetakan

m3

550,000

650,000

Kayu bakar

m3

135,000

150,000

Bambu

bt

7,000

10,000

30 X 30 cm

m2

24,000

26,000

20 X 20 cm

m2

22,500

27,000

30 X 30 cm

m2

26,000

28,000

20 X 20 cm

m2

25,000

27,000

30 X 30 cm

m2

39,000

42,000

PC warna

10 X 20 cm

bh

5,000

5,500

PC abu-abu

15 x 20

bh

4,500

6,000

Lantai/badan

m'

-

-

Plint

m'

-

-

Trap

m'

-

-

11 X 11 putih

dos

27,500

30,000

11 X 11 warna

dos

29,000

30,000

15 X 15 putih

dos

28,000

29,000

15 X 15 warna

dos

32,000

33,000

10 X 20 cm

m2

31,000

35,000

15 X 15 cm

m2

32,000

35,000

20 X 20 cm

m2

28,500

35,000

20 X 25 cm

m2

23,000

33,000

30 X 30 cm

m2

31,000

33,000

20 X 20 cm

m2

33,000

35,000

33 x 33 cm

m2

30,000

35,000

25 x 25 cm

m2

28,000

35,000

15 x 20 cm

m2

34,000

36,000

7 Parquet Jati

m2

140,000

150,000

8 Batu Paros

m2

70,000

75,000

9 Batu Tempel Hitam

m2

65,000

80,000

2 KAMPER

3 KRUING

4 MERANTI

5 LANAN

6 BENGKIRAI

7 DOLKEN

Papan

IV . BAHAN PENUTUP DINDING / LANTAI 1 UBIN (TEGEL BIASA) PC polos PC warna Teraso 2 TEGEL PLINT

3 POLIS UBIN

4 UBIN PORSELIN Lokal Lokal 5 MOZAIK PORSELIN

6 Keramik

HARGA NO.

J E N I S

10 GRANITO

B A H A N

40 x 40 cm 30 x 30 cm

11

Marmer

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

m2

250,000

270,000

m2

300,000

310,000

m2

375,000

390,000

V.BAHAN CETAK 1 BUIS BETON

10 cm - 100 cm

bh

17,000

20,000

Ø 20 cm - 100 cm

bh

20,000

25,000

Ø 30 cm - 100 cm

bh

30,000

32,000

Ø 50 cm - 100 cm

bh

55,000

65,000

Ø 60 cm - 100 cm

bh

75,000

85,000

Ø 70 cm - 100 cm

bh

90,000

110,000

U 10 cm - 100 cm

bh

17,000

18,000

U 15 cm - 100 cm

bh

22,000

25,000

U 20 cm - 100 cm

bh

30,000

32,000

U 30 cm - 100 cm

bh

35,000

40,000

U 50 cm - 100 cm

bh

-

-

bh

5,000

5,200

20 X 20 cm

bh

5,500

6,000

25 X 25 cm

bh

6,250

6,500

30 X 30 cm

bh

6,300

7,000

15 X 25 cm

bh

6,500

7,250

15 X 30 cm

bh

7,000

7,500

Ø

2 LUBANG ANGIN (ROSTER) PC + PASIR 10 X 20 cm

VI . B A H A N B E S I besi beton polos

kg

9,000

10,000

besi beton prestress

kg

14,000

15,500

besi beton ulir

kg

10,500

11,000

2 BESI PLAT

Besi Strip

kg

11,000

12,000

3 BESI PROFIL

Besi Profil

kg

13,000

13,500

kg

13,000

15,000

kg

14,000

15,000

1 BESI BETON

4 JARING - JARING BAJA Diameter Diameter

4 - 15 6 - 15

40 X 40 X 4

btg

110,000

115,000

L 50 X 50 X 5

btg

165,000

171,000

L 60 X 60 X 6

btg

240,000

247,000

6 KAWAT - Ikat beton/bendrat

kg

13,500

15,000

- Harmonika 12 X 45 mm

m2

20,000

21,000

- Harmonika 12 X 24 mm

m2

22,000

22,500

- Harmonika 14 X 30 mm

m2

19,000

20,000

- Harmonika 14 X 35 mm

m2

17,500

19,000

- Kawat Nyamuk Nylon

m2

9,000

10,000

- Kawat Kasa

m2

12,000

13,000

- Saringan pasir

m2

13,000

14,500

- Kawat loket

m2

8,500

9,000

- Kawat duri

rol

60,000

75,000

- Kawat bronjong

kg

17,500

18,000

Pipa PVC DN 20 ( ½" ) AW JIS

btg

19,000

20,000 panjang 4 m

Pipa PVC DN 25 ( ¾" ) AW JIS

btg

22,000

22,500 panjang 4 m

Pipa PVC DN 32 ( 1" ) AW JIS

btg

27,500

28,000 panjang 4 m

Pipa PVC DN 40 ( 1½" )

btg

45,000

51,200 panjang 6 m

5 BESI SIKU

L

VII . B A H A N P I P A 1 Pipa PVC SII SCJ , S - 12,5 (10 bar)

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

Pipa PVC DN 63 ( 2" )

btg

57,000

77,000 panjang 6 m

Pipa PVC DN 90 ( 3" )

btg

122,500

139,250 panjang 6 m

Pipa PVC DN 110 ( 4" )

btg

170,000

202,950 panjang 6 m

Pipa PVC DN 160 ( 6" )

btg

325,000

423,000 panjang 6 m

Pipa PVC DN 200 ( 8" )

btg

590,000

660,000 panjang 6 m

Pipa PVC DN 250 ( 10" )

btg

1,010,000

1,025,000 panjang 6 m

Pipa PVC DN 315 ( 12" )

btg

1,380,000

1,390,000 panjang 6 m

3 Pipa Medium B Galvanis - SII Pipa Medium B Galvanis DN ½"

btg

70,000

80,000 panjang 6 m

Pipa Medium B Galvanis DN 25 ( ¾" )

btg

112,000

117,000 panjang 6 m

Pipa Medium B Galvanis DN 32 ( 1" )

btg

125,000

127,500 panjang 6 m

Pipa Medium B Galvanis DN 50 ( 1½" )

btg

185,000

190,000 panjang 6 m

Pipa Medium B Galvanis DN 63 ( 2" )

btg

225,000

235,000 panjang 6 m

Pipa Medium B Galvanis DN 2½"

btg

380,000

390,000 panjang 6 m

Pipa Medium B Galvanis DN 90 ( 3" )

btg

470,000

480,000 panjang 6 m

Pipa Medium B Galvanis DN 110 ( 4" )

btg

585,000

595,000 panjang 6 m

Pipa Medium B Galvanis DN 160 ( 6" )

btg

-

- panjang 6 m

Pipa Medium B Galvanis DN 200 ( 8" )

btg

-

- panjang 6 m

btg

-

- panjang 6 m

Pipa Medium B Galvanis DN 250 ( 10")

VIII . B A H A N L A N G I T - L A N G I T 1 AKUSTIK-uk :

30 X 30

lbr

4,700

4,750

30 X 60

lbr

11,000

12,000

60 X 120

lbr

37,000

38,000

m'

4,200

5,000

List Kayu Profil 2 SOFT BOARD-uk:

4'X 8' lbr

55,000

59,000

4'X 8'

lbr

60,000

62,000

Gypsum tebal 9 mm 3 HARD BOARD-uk: 4 PLY WOOD Teak wood 90 X 210

X 3 mm

lbr

38,000

40,000

. 120 X 240

X 3 mm

lbr

75,000

85,000

. 90 X 210

X 4 mm

lbr

51,000

55,000

. 90 X 210

X 9 mm

lbr

140,000

145,000

. 90 X 210

X 12 mm

lbr

170,000

172,500

. 90 X 210

X 15 mm

lbr

220,000

225,000

. 90 X 210

X 18 mm

lbr

270,000

275,000

. 120 X 240

X 3 mm

lbr

40,000

42,000

. 120 X 240

X 4 mm

lbr

47,500

50,000

. 120 X 240

X 6 mm

lbr

61,000

67,500

. 120 X 240

X 9 mm

lbr

95,000

105,000

. 120 X 240

X 12 mm

lbr

127,500

135,000

. 120 X 240

X 15 mm

lbr

152,500

162,500

. 120 X 240

X 18 mm

lbr

180,000

185,000

lbr

45,000

50,000

kg

11,000

15,000

Tripleks

Multipleks

Formika ukuran pintu

IX . B A H A N F I N I S H I N G 1 KAYU Menie Dempul plamur

kg

11,000

12,000

Ambril/amplas

lbr

3,000

3,200

Batu Apung

kg

5,000

5,500

Cat dasar

kg

13,000

13,200

. Emco

kg

38,000

39,000

. Yunior 66 (nippon paint)

kg

37,000

39,000

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

. Deculux

kg

42,000

45,000

. Siralax

ons

6,500

8,000

. Spiritus

ltr

8,000

8,500

. Plitur jadi

ltr

29,000

31,000

Kalkarium

kg

4,000

4,200

Kapur sirih

kg

4,500

4,750

Plamur

kg

9,000

10,500

2 TEMBOK

kg

12,500

15,000

Sintex

5 kg

60,000

65,000

Danabride

5 kg

70,500

75,000

Catylac

5 kg

75,000

78,000

Mowilex

5 kg

125,000

135,000

Cat Tembok

3 BESI Menie

kg

13,000

18,000

Cat mengkilat

kg

35,000

42,000

Cat

kg

12,500

13,000

Thinner A

ltr

8,000

9,000

Minyak cat

ltr

6,000

8,000

Thinner Super

ltr

8,000

9,000

50,000

54,000

Residu (teer/aspal)

drum

Fibre glass (tanki air) kapasitas 550 liter.

bh

650,000

675,000

kapasitas 1100 liter.

bh

950,000

1,100,000

Lem Aica Aibon

kg

32,000

35,000

3 mm

m2

50,000

55,000

5 mm

m2

60,000

65,000

3 mm

m2

55,000

60,000

5 mm

m2

65,000

70,000

3 mm

m2

60,000

65,000

5 mm

m2

70,000

72,000

X.BAHAN KACA 1 POLOS

2 ES KABUR

3 RAY BAND

XI . BAHAN INSTALASI LISTRIK 1 KABEL LISTRIK N YA : .

1 X 1 1/2

mm2

m'

3,000

3,100

SPLN LMK

1 X 2 1/2

mm2

m'

3,150

3,300

1X4

mm2

m'

4,700

5,000

1X6

mm2

m'

6,900

7,000

NYY :.

2 X 1 1/2

mm2

m'

9,300

9,500

PRIMA

2 X 2 1/2

mm2

m'

10,250

10,500

2X4

mm2

m'

16,650

16,700

2X6

mm2

m'

20,100

20,500 11,750

.

.

3 X 1 1/2

mm2

m'

11,450

3 X 2 1/2

mm2

m'

15,400

15,750

3X4

mm2

m'

20,000

20,500

3X6

mm2

m'

27,800

28,000

NYM :.

2 X 1 1/2

mm2

m'

6,600

7,000

PRIMA

2 X 2 1/2

mm2

m'

9,000

10,000

2X4

mm2

m'

13,000

14,000

3 X 1 1/2

mm2

m'

8,450

9,000

.

KETERANGAN

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

3 X 2 1/2

mm2

m'

12,000

12,500

3X4

mm2

m'

17,400

18,000

m'

23,800

24,500

Seri

bh

15,000

17,500

Engkel

bh

12,000

13,000

Seri

bh

11,500

15,000

Engkel

bh

9,500

11,000

1 group

bh

20,000

25,000

2 group

bh

20,000

35,000

3 group

bh

50,000

55,000

3X6

mm2

2 SKAKELAR Out bauw . . In bauw . .

3 FUSE BOX (SEKERING KASA)

4 STEKER -

5 FITING

Biasa

bh

9,500

10,000

Arde

bh

14,000

15,000

T Biasa

bh

11,000

12,500

T dengan Arde

bh

15,000

17,000

Flaon

bh

2,500

7,500

Gantung

bh

2,250

7,500

Kap

bh

9,250

15,000

Kombinasi

bh

8,700

10,000 12,500

bh

7,000

Arde Outbow hitam

bh

4,500

5,000

Arde IB

bh

10,000

12,500

Arde Putar

bh

31,000

35,000

1 X slag

bh

45,000

50,000

2 X slag

bh

60,000

65,000

1 X slag

bh

75,000

80,000

2 X slag

bh

125,000

135,000

1 X slag

bh

45,000

50,000

bh

60,000

70,000

6 STOP KONTAK - Arde Outbow putih

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG 1 KUNCI TANAM

Union : Yale : Kuda :

2 X slag 2 ENGSEL DAN GERENDEL Engsel Angin

bh

15,000

16,000

Kupu-kupu biasa

bh

2,250

2,500

Nylon kupu-kupu

bh

5,000

9,000

bh

30,000

32,000

Grendel Tanam luar negeri

bh

7,500

8,250

Grendel biasa

bh

7,500

10,000

Kait Angin

bh

5,000

15,000

Door Stop

bh

10,000

15,000

bh

900,000

1,100,000

bh

80,000

105,000

bh

625,000

650,000

Espagnoled -

dalam negeri

XIII . BAHAN SANITAIR 1 KLOSET DUDUK

2 KLOSET JONGKOK

3 WASTAFEL PEDESTAL

KETERANGAN

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

bh

700,000

750,000

bh

275,000

300,000

bh

240,000

250,000

bh

210,000

230,000

bh

145,000

160,000

bh

27,500

30,000

bh

20,000

22,500

5 Pemakai 500 liter

unit

-

-

10 Pemakai 1.000 liter

unit

-

-

Kran Air

bh

7,500

15,000

Seal tape

bh

2,000

2,200

Floor drain

bh

3,750

4,000

1 PAKU - ukuran 1" s/d 4"

kg

13,000

14,000

2 PAKU - payung

kg

18,000

20,000

3 PAKU - sekrup

doos

13,500

15,000

4 PAKU - beton

bh

18,000

20,000

5 MUR BAUT (kuda-kuda)

kg

14,000

14,500

6 ANGKUR BAUT

bh

12,800

13,000

7 LEM KAYU

bh

18,000

20,000

kg

5,500

7,000

bh

185,000

190,000

4 WASTAFEL MEJA OVAL

5 WASTAFEL GANTUNG BULAT

6 WASTAFEL GANTUNG SUDUT

7 WASTAFEL GANTUNG SUDUT KECIL 8 WASTAFEL BAK CUCI 9 TEMPAT SABUN GANTUNG

10 TEMPAT SABUN TANAM

11 SEPTIC TANK (ETERNIT GRESIK)

12

LAIN - LAIN

XIV . ALAT PENGIKAT KAYU

8 Tali Ijuk

XV . POMPA AIR. 1 POMPA AIR TANGAN Dragon buatan Indonesia 2 POMPA AIR LISTRIK Sanyo

100 watt

bh

325,000

475,000

Fuji

250 watt

bh

850,000

900,000

. 100 watt

bh

285,000

350,000

. 90 watt

bh

190,000

220,000

. 125 watt

bh

215,000

250,000

. 175 watt

bh

320,000

340,000

Abu-abu

m2

30,000

37,500

Merah/hitam

m2

38,000

40,000 36,000

Shimizu Dab

X VI . PAVING BLOCK 1 SQUARE 2 HOLLAND

Abu-abu

m2

35,000

Merah/hitam

m2

39,000

41,000

3 UNIDECOR

Abu-abu

m2

30,500

35,000

Merah/hitam

m2

33,000

40,000

Abu-abu

m2

35,000

37,000

Merah/hitam

m2

40,000

42,000

Abu-abu

m2

30,000

35,000

Merah/hitam

m2

33,000

40,000

4 UNI 5 TRIHEX

HARGA NO.

J E N I S

B A H A N

SATUAN

MINIMUM

MAKSIMUM

(Rp)

(Rp)

KETERANGAN

6 OLYMPIA HEXA

Abu-abu

m2

31,000

35,000

7 HEXAGONAL

Abu-abu

m2

40,000

40,000

Merah/hitam

m2

35,000

37,000

8 CASTLE

Abu-abu

m2

40,000

42,000

9 TRAPEZ

Abu-abu

m2

30,000

35,000

10 TRAPEZ GRASS BLOCK m2

41,000

42,000

11 STANDARD GRASS BLOCK ABU-ABU

m2

38,000

48,000

12 BATACO

m2

2,000

2,250

13 KANSTEEN

m'

22,500

28,500

Abu-abu

XVII. L A I N - L A I N 1 KREI 25 MM

m2

40,000

45,000

2 Sliding Pintu J4

bh

185,000

200,000

3 Naco per Daun

bh

7,000

7,500

4 Rolling door Besi

m2

225,000

230,000

m2

210,000

215,000

5 Awning Almunium

m2

75,000

80,000

6 Kusen Almunium 4" Putih

m'

68,000

70,000

btg

1,250,000

1,260,000

drum

1,275,000

1,300,000

Rolling door Almunium

7 WIDE FLANGE BEAM 150 X 75 X 5 X 7 X 12 8 ASPAL. Aspal Ex Pertamina isi Net 160 kg Hotmix Tebal = 4 Cm

m2

60,000

62,500

Hotmix Tebal = 5 Cm

m2

70,000

75,000

Hotmix Tebal = 6 Cm

m2

85,000

90,000

Hotmix Tebal = 7 Cm

m2

100,000

105,000

Binder Course

ton

210,000

215,000

Wearing Course

ton

120,000

125,000

Hot Roller Sheet

ton

110,000

115,000

Sand Sheet

ton

120,000

125,000

Sand Sheet Emulsi

ton

145,000

150,000

Cold Mix

ton

175,000

180,000

Prime / Tack Coard RC

liter

7,900

8,100

Prime Coat MC

liter

7,900

8,100

Prime / Tack Coat Emulsi

liter

7,900

8,100

m2

65,000

67,000

Grey Euro / Green 5 mm

m2

87,000

88,000

Bronze / Blue / Green 5 mm

m2

90,000

92,500

Ø 40 cm

m'

-

-

Ø 45 cm

m'

-

-

Ø 50 cm

m'

-

-

Diameter 40 cm, t = 12 mm

m'

-

-

10 K A C A

Dark Grey 5 mm

11 TIANG PANCANG Tiang Pancang Beton Tiang Pancang Baja 12 PAGAR BRC.

Diameter 50 cm, t = 12 mm

m'

-

-

Pagar BRC 90 A2

/lb

500,000

520,000

Pagar BRC 120 A2

/lb

600,000

620,000

13. LAIN-LAIN Minyak Beton & bekisting

ltr

8,000

10,000

Pintu Lipat Besi

m2

350,000

380,000 280,000

Sunscreen Allumunim

m2

265,000

Allumunium Foil

m2

6,500

6,700

Soda api

kg

12,000

12,500

Sabun

kg

11,000

12,500

Air

m3

3,700

4,250

Koas Alang-alang

ikat

1,250

1,250

Solar (Industri)

ltr

11,250

11,250

Premium (Industri)

ltr

8,900

8,900

Pelumas

ltr

29,000

29,000

DAFTAR SUMBER

DATA

D A E R A H

HAR GA SAT UAN PE K E R JAAN

:

PASARAN

:

KOTA SEMARANG

BEBAS EDISI KEDUA 2012 HARGA SATUAN PEKERJAAN

NO.

I

II

SNI

KODE

03-2835-2002

03-2835-2008

URAIAN PEKERJAAN

450,150.00

m'

93,425.00

97,375.00

6.5 Pembuatan Kantor Sementara dg Lantai Plesteran

m2

506,785.00

552,587.50

6.6 Pembuatan Gudang Semen dan Alat-alat

m2

429,475.00

465,806.25

6.8 Membersihkan Lapangan dan Perataan

m2

5,150.00

5,550.00

6.11 Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm

m2

22,820.90

27,462.50

6.13 Bongkaran Beton Bertulang

m3

214,329.00

234,996.00

6.14 Bongkaran Dinding Tembok Bata Merah

m3

201,429.00

221,496.00

6

PEKERJAAN TANAH Menggali Tanah Biasa Sedalam 1 m

m3

23,575.00

25,875.00

6.2 Menggali Tanah Biasa Sedalam 2 m

m3

28,935.00

31,725.00

6.3 Menggali Tanah Biasa Sedalam 3 m

m3

34,381.00

37,665.00

6.4

Menggali Tanah Keras Sedalam 1 m

m3

31,376.00

34,440.00

6.5

Menggali Tanah Cadas Sedalam 1 m

m3

47,580.00

52,200.00

6.6

Menggali Tanah Lumpur Sedalam 1 m

m3

37,935.00

41,625.00

6.7

Mengerjakan Striping Tebing Setinggi 1 m

m2

1,715.00

1,875.00

6.8

MembuangTanah sejauh 30 m'

m3

1,715.00

1,875.00

6.9

Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

m3

Pemadatan Tanah (per 20 cm)

m3

17,150.00

18,750.00

m3

99,430.00

112,350.00

6.12

Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL

m3

164,225.00

180,830.00

6.14

Pemasangan Lapisan Ijuk tebal 10 cm

m2

38,145.00

47,625.00

m3

146,575.00

153,375.00

6

PEKERJAAN PONDASI Memasang Pondasi Batu Kali 1Pc : 3 PP

m3

498,325.00

527,175.00

6.2 Memasang Pondasi Batu Kali 1Pc : 4 PP

m3

461,750.00

490,637.50

6.3

Memasang Pondasi Batu Kali 1Pc : 5 PP

m3

436,400.00

465,310.00

6.4 Memasang Pondasi Batu Kali 1Pc : 6 PP

m3

418,575.00

447,502.50

6.5 Memasang Pondasi Batu Kali 1Pc : 8 PP

m3

394,150.00

423,097.50

6.6 Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp

m3

321,650.00

353,450.00

6.7

m3

379,815.00

409,212.50

6.8 Memasang Pondasi Batu Kali, ¼ Pc : 1Kp : 4 PP

m3

355,695.00

384,602.50

6.9

Pasang Pondasi Batu Kosong

m3

218,832.00

238,818.00

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah

m3

1,663,375.00

1,817,980.00

m3

467,917.00

490,300.00

6.1 Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp

m2

139,865.00

151,108.75

6.2 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP

m2

130,162.50

141,439.38

6.3 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP

m2

123,692.50

134,919.38

6.4 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP

m2

120,250.00

131,557.50

6.5 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP

m2

118,865.00

130,426.25

6.6 Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP

m2

111,699.00

123,125.00

6.7

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP

m2

66,742.50

72,299.38

6.8

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP

m2

62,183.50

67,713.13

6.9 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP

m2

59,545.00

65,083.75

6.10 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP

m2

57,884.00

63,430.00

6.11 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP

m2

56,956.00

62,545.00

6.12 Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP

m2

55,170.00

60,751.25

6.13

m2

55,995.00

61,776.25

6.20 Memasang Dinding HB/CB 10, speci camp. 1PC : 3PP

m2

103,033.00

113,337.50

6.21 Memasang Dinding HB/CB 10, speci camp. 1PC : 4PP

m2

102,851.50

113,478.13

6.22 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 2PP

m2

227,795.00

252,200.00

6.23 Memasang Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1Pc : 4PP

m2

225,020.00

249,432.50

6.1 Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm

m2

34,599.20

36,443.00

6.2 Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm

m2

29,555.20

31,393.00

6.3

Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm

m2

27,359.80

29,212.00

6.4 Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm

m2

25,872.00

27,720.00

6.5 Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm

m2

25,013.20

26,878.00

6.6 Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm

m2

24,331.80

26,202.00

6.7 Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm

m2

23,952.80

25,832.00

Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP

6.11 Pasang Pondasi Sumuran diameter 100 cm

03-2837-2008

413095359.xls

1/3 x Gal.tanah

6.11 Urugan Pasir

6.10

V

463,066.25

m'

6.1

03-6897-2008

(Rp)

6.4 Pengukuran dan Pemasangan Bouwplank

6.15 Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan

IV

MAKSIMUM

(Rp) 6 PEKERJAAN PERSIAPAN

6.10

03-2836-2008

MINIMUM

6.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

6.1

III

SAT

6

6

PEKERJAAN DINDING

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP

PEKERJAAN PLESTERAN

12

sat.pekerjaan

HARGA SATUAN PEKERJAAN NO.

VI

VII

SNI

03-3434-2008

03-7394-2008

413095359.xls

KODE

URAIAN PEKERJAAN

SAT

MINIMUM

MAKSIMUM

(Rp)

(Rp)

6.8 Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm

m2

23,573.80

25,462.00

6.9 Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm

m2

25,172.00

26,984.00

6.10 Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm

m2

23,539.00

25,451.50

6.11 Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm

m2

20,874.00

22,914.00

6.12 Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm

m2

20,994.00

23,034.00

6.13 Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm

m2

39,534.60

41,994.00

6.14

Memasang Plesteran 1Pc : 3Pp Tebal 20 mm

m2

32,020.40

34,061.00

6.15 Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm

m2

34,582.00

37,050.00

6.16 Memasang Plesteran 1Pc : 5Pp Tebal 20 mm

m2

33,478.60

35,974.00

6.17 Memasang Plesteran 1Pc : 6Pp Tebal 20 mm

m2

32,528.40

35,026.00

6.18 Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm

m2

29,021.00

31,764.00

6.19

m2

16,897.20

18,059.00

6.20 Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm

m'

22,522.00

24,251.25

6.23

m2

19,381.00

20,775.00

6.24 Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m')

m2

11,467.40

12,213.25

6.25 Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m')

m2

5,532.00

5,883.00

6.26

Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp

m2

24,477.00

26,146.25

6.27

Memasang Acian

m2

14,292.50

15,273.13

6

PEKERJAAN KAYU 6.1 Membuat Kosen Pintu & Jendela Kayu klas I

m3

21,543,800.00

22,185,950.00

6.2 Membuat Kosen Pintu & Jendela Kayu klas II atau III

m3

7,028,150.00

7,947,600.00

6.3 Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer)

m2

290,649.00

311,145.00

6.5 Membuat Daun Pintu Panel Kayu Klas I atau II

m2

398,550.00

427,350.00

6.6 Membuat Pintu & Jendela Kaca Kayu Klas I atau II

m2

277,120.00

297,480.00

6.7 Membuat Pintu & Jendela Jalusi Kayu Klas I atau II

m2

1,518,650.00

1,596,350.00

6.8 Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)

m2

321,345.00

345,265.00

6.9 Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II

m2

341,390.00

366,820.00

6.10 Membuat Jalusi mati Kosen Kayu Klas I atau II

m2

1,385,455.00

1,454,685.00 754,100.00

Memasang Berapen 1 Pc : 5Pp Tebal 15 mm Memasang Plesteran Ciprat 1Pc : 2 Pp

6.11 Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I

m2

714,310.00

6.12 Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II

m2

361,154.00

388,640.00

6.13 Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter

m3

6,444,800.00

7,278,900.00

6.14 Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I

m3

23,591,650.00

24,290,175.00

6.15 Memasang konstruksi Gording, Kayu Klas II

m3

6,146,200.00

6,957,300.00

6.16 Memasang Rangka Atap Genteng Keramik, Kayu Klas II

m2

98,915.00

112,115.00

6.17 Memasang Rangka Atap Genteng Beton, Kayu Klas II

m2

116,915.00

132,635.00

6.18 Memasang Rangka Atap Sirap, Kayu Klas II

m2

836,798.00

953,254.00

6.19 Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III

m2

100,675.00

113,215.00

6.20 Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III

m2

104,530.00

117,770.00

6.21 Memasang Listplank Uk. (3x20)cm Kayu klas I atau II

m'

240,215.00

252,065.00

6.22 Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II

m'

76,565.00

81,965.00

6.23 Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III 6.24 Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II

m2 m2

166,819.00 220,759.00

188,475.00 246,975.00

6.26 Memasang Dinding Lambriziring dari Papan klas I

m2

249,715.00

264,660.00

6.27 Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm

m2

25,203.00

27,171.00

6.28 Memasang Dinding Bilik, Rangka Kayu Klas III atau IV

m2

86,908.60

93,943.00

6.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87

m3

497,474.50

516,584.39

6.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78

m3

524,931.91

544,159.59

6.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72

m3

546,607.83

565,934.39

6.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87

m3

464,183.19

481,602.46

6.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66

m3

572,080.06

591,509.99

6.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61

m3

596,650.43

616,205.62

6.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

m3

614,663.39

634,279.63

6.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56

m3

627,031.91

646,738.16

6.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53

m3

648,224.50

668,100.46

6.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52

m3

654,848.57

674,772.09

6.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49

m3

697,531.80

719,279.19

6.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48

m3

706,170.69

727,986.92

6.17 Pembesian dg Besi Polos atau Besi Ulir

10 Kg

101,912.00

113,079.00

6.18 Kabel Presstresed Polos/strand

10 Kg

152,204.00

168,420.00

6.19 Jaring Kawat baja/Wire Mesh

1 Kg

15,818.00

18,089.00

6.20 Memasang Bekisting untuk Pondasi

m2

54,988.00

61,932.00

6.21

Memasang Bekisting untuk Sloof

m2

57,738.00

65,182.00

6.22

Memasang Bekisting untuk Kolom

m2

215,204.00

231,356.00

6.23

Memasang Bekisting untuk Balok

m2

228,704.00

245,756.00

6.24

Memasang Bekisting untuk Lantai

m2

283,204.00

303,356.00

6.25

Memasang Bekisting untuk Dinding

m2

269,204.00

288,856.00

6.26

Memasang Bekisting untuk Tangga

m2

209,304.00

224,356.00

6.27

Memasang Jembatan Cor

m2

37,889.00

42,255.00

6

PEKERJAAN BETON

13

sat.pekerjaan

HARGA SATUAN PEKERJAAN NO.

SNI

KODE

URAIAN PEKERJAAN

SAT

MINIMUM

(Rp)

VIII

IX

03-3436-2002

03-2839-2008

XI

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting)

m3

2,402,575.00

2,627,225.00

6.29

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting)

m3

2,966,700.00

3,255,755.00

6.30 Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting)

m3

5,652,564.00

6,157,251.00

6.31 Membuat Balok Beton Bertulang (200 kg Besi + Bekisting)

m3

4,365,059.00

4,737,986.00

6.32 Membuat Balok Beton Bertulang (150 kg Besi + Bekisting)

m3

3,999,595.00

4,323,405.00

6.33 Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting)

m3

3,999,460.00

4,319,264.00

6.34 Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting)

m3

4,060,704.00

4,409,171.00

6.35 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm

m'

43,774.50

48,002.00

6.36 Membuat Ring Balok Beton Bertulang (10 x 15) cm

m'

58,385.00

63,926.75

46,411.00

6

PEKERJAAN PENUTUP ATAP

6.1

Pasang Atap Genteng Plentong Kecil

m2

40,704.00

6.2

Pasang Atap Genteng Kodok / Glasur

m2

70,704.00

76,411.00

6.3

Pasang Atap Genteng Plentong Super / Besar

m2

57,914.00

62,172.00

6.4

Pasang Genteng Bubung Plentong

m'

48,886.00

51,810.00

6.5

Pasang Genteng Bubung Kodok / Glasur

m'

65,886.00

70,810.00

6.6

Pasang Genteng Bubung Plentong Besar

m'

60,386.00

63,810.00

6.9

Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm

m2

54,164.00

56,581.00

6.10 Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm

m2

53,876.00

56,274.00

6.12 Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm

m2

35,501.00

36,924.00

6.15 Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm

m2

34,136.00

36,555.00

6.30 Pasang Atap Genteng Beton

m2

44,270.00

47,440.00

6.33 Pasang Atap Sirap

m2

103,049.00

110,563.00

6.34 Pasang Nok Genteng Beton

m'

29,115.00

30,655.00

6.37 Pasang Nok Sirap

m'

58,813.00

62,960.00

6.38 Pasang Atap Seng Gelombang

m2

52,288.00

54,272.00

6.39 Pasang Atap Nok Seng

m'

27,938.00

29,266.00

6.42 Pasang Allumunium Foil / Sisalation

m2

13,894.00

14,730.00

6.1 Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm

m2

17,517.00

18,949.00

6.2 Memasang Langit-langit Akustik Ukuran (30x30) cm

m2

66,248.00

67,654.00

6.3 Memasang Langit-langit Akustik Ukuran (30x60) cm

m2

72,115.00

78,595.00

6.5 Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm

m2

27,180.00

29,340.00

6.6 Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm

m2

376,450.00

396,500.00

6.7 Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm

m2

26,945.00

29,036.00

6.9 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium

m2

129,975.00

137,025.00

m'

8,394.00

9,560.00

6

PEKERJAAN LANGIT-LANGIT

6

03-7393-2008

PEKERJAAN SANITASI 6.1 Memasang Closet Duduk / Mono Blok

Unit

1,103,925.00

1,329,447.00

6.2 Memasang Closet Jongkok Porselen

Unit

251,930.00

287,975.00

6.4 Memasang Urinoir

Unit

443,850.00

482,975.00

6.5 Memasang Wastafel

Unit

970,400.00

1,040,160.00

6.8 Memasang Bak Mandi Batu Bata Vol. 0,30 m3

828,190.91

Unit

763,900.00

6.14

Memasang Pipa Beton, Ø 15 cm - 20 cm

m'

47,230.00

55,489.00

6.15

Memasang Pipa Beton, Ø 30 cm - 100 cm

m'

242,287.00

268,631.75

6.20 Memasang Pipa Galvanis Ø ¾"

m'

35,719.33

37,515.00

6.23

Memasang Pipa Galvanis Ø 3"

m'

132,898.87

136,393.00

6.24

Memasang Pipa Galvanis Ø 4"

m'

165,479.90

169,201.83

6.25

Memasang Pipa PVC type AW Ø ½"

m'

11,189.90

11,881.00

6.29

Memasang Pipa PVC type AW Ø 2"

m'

20,466.10

26,088.17

6.31

Memasang Pipa PVC type AW Ø 3"

m'

40,259.63

45,242.92

6.33

Memasang Bak Cuci Piring Stainles Steel

Buah

304,314.50

335,367.50

6.35

Memasang Kran Ø ¾" atau ½"

Buah

12,515.00

20,360.00

6.36

Memasang Floor Drain

Buah

8,715.00

9,325.00

6

PEKERJAAN BESI & ALLUMUNIUM 6.1 Memasang Besi Profil

Kg

20,329.00

21,582.00

6.2 Memasang Rangka Kuda-kuda Baja IWF

kg

19,549.00

20,502.00

100 kg

21,970.00

22,662.00

m2

638,861.00

685,925.00

10 cm m2

16,609.50 314,658.00

18,617.50 327,110.00

6.8 Memasang Pintu Lipat (Folding Door)

m2

383,726.00

416,498.00

6.9 Sunscreen Allumunium

m2

303,172.00

320,980.00

6.10 Memasang Rolling Door Allumunium

m2

286,650.00

297,950.00

6.11 Memasang Kusen Pintu Allumunium

m'

82,593.80

85,764.60

6.12 Memasang Pintu Allumunium Strip Lebar 8 cm

m2

743,713.10

826,048.50

6.13 Memasang Pintu Kaca Rangka Allumunium

m2

192,570.00

222,308.00

6.14 Memasang Venetions Blinds & Vertical Blinds

m2

121,849.00

129,055.00

6.15 Memasang Terali Besi Strip (2x3) cm

m2

195,931.00

212,628.00

6.3 Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja) 6.4 Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku 6.5 Mengerjakan Pengelasan dengan Las Listrik 6.7 Memasang Pintu Rolling Door Besi

413095359.xls

(Rp)

6.28

6.10 List Langit-Langit Kayu Profil X

MAKSIMUM

14

sat.pekerjaan

HARGA SATUAN PEKERJAAN NO.

SNI

XII

XIII

KODE

MAKSIMUM

(Rp)

(Rp)

220,972.55

246,727.43

6.17 Memasang Jendela Nako & Tralis

m2

26,293.00

28,535.00

6.18 Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm

m'

138,200.00

145,985.00

6.19 Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm

m'

63,724.00

67,760.00

157,525.00

PEKERJAAN KUNCI & KACA

6.2

Memasang Kunci Tanam Biasa

Buah

145,965.00

6.3

Memasang Kunci Kamar Mandi

Buah

65,482.50

72,012.50

6.4

Memasang Kunci Selinder

Buah

145,482.50

157,012.50

6.5

Memasang Engsel Pintu

Buah

12,447.50

16,987.50

6.6

Pasang Engsel Jendela Kupu-kupu

Buah

7,215.00

7,825.00

6.7

Pasang Engsel Angin

Buah

24,930.00

26,650.00

6.9

Pasang Kait Angin

Buah

12,157.25

22,683.75

6.10 Pasang Door Closer 6.11 Pasang Kunci Selot

Buah Buah

33,857.50 17,043.00

40,612.50 20,245.00

6.13 Pasang Door Stop

Buah

14,771.50

20,122.50

6.14 Pasang Rel Pintu Dorong

Buah

213,629.00

230,735.00

6.15 Pasang Kunci Lemari

Buah

19,425.00

22,803.75

6.16 Pasang Kaca tebal 3 mm

m2

62,157.25

68,183.75

6.17 Pasang Kaca tebal 5 mm

m2

73,155.00

79,182.25

6.20 Pasang Kaca Cermin tebal 5 mm

m2

102,857.25

104,483.75

6

PEKERJAAN PENUTUP LANTAI & DINDING m2

14,749.00

61,973.00

6.9 Memasang lantai Ubin Granito Uk. 40 x 40 cm 6.19 Pasang Plint Ubin PC Warna Uk. 10 x 20 cm

m2 m'

306,459.00 35,892.00

330,949.50 39,269.25

6.34 Memasang Lantai Keramik 33 x 33 cm 6.35 Memasang Lantai Keramik 30 x 30 cm

m2 m2

100,217.83 100,077.73

111,460.76 111,063.18

6.36 Pasang Lantai Keramik 20 x 20 cm 6.39 Memasang Plint Keramik Ukuran 10x20 cm

m2 m'

99,415.00 14,017.00

112,020.00 14,981.01

6.40 Memasang Plint Keramik Ukuran 10x10 cm

m'

19,542.00

20,842.78

6.43 Memasang Lantai Marmer Ukuran 1.00x1.00 cm 6.44 Memasang Lantai Karpet

m2 m2

455,654.50 89,877.00

476,271.88 94,624.00

6.46 Memasang Lantai Parquet Jati

m2

204,280.00

219,870.00

6.53 Memasang Dinding Keramik 10x20 cm,

m2

118,585.00

130,191.25

6.54 Memasang Dinding Keramik 20x20 cm,

m2

102,815.00

119,971.25

6.55 Memasang Dinding Marmer Ukuran 1.00x1.00 cm

m2

490,362.11

513,552.61

6.57 Memasang Dinding Batu Paros / Batu Tempel Hitam

m2

131,792.50

141,254.38

6.60 Memasang Wall Paper Lebar 50 cm 6.63 Memasang Plint Kayu Klas II Ukuran 2x10 cm

m2 m'

114,351.00 26,603.00

127,714.00 28,559.50

6.1 Mengikis / Mengerok Permukaan Cat Tembok Lama

m2

5,207.50

5,687.50

6.2 Mencuci Bidang Permukaan Tembok yang Pernah dicat

m2

5,157.50

5,687.50

6.3 Mengerok Karat Cat Lama permukaan Baja dg cara manual 6.4 Penyabun Permukaan Tembok Lama

m2 m2

5,157.50 5,157.50

5,687.50 5,687.50

6.6 Mendempul dan Menggosok Kayu

m2

4,387.50

4,780.50

m2 m2

15,525.00 18,777.50

16,980.00 20,275.50

m2

25,947.50

27,819.50

m2 m2 m2 m2 m2

17,102.50 24,365.50 4,133.00 17,242.50 9,561.00

18,262.50 26,026.50 4,515.00 18,619.50 10,383.60

m2

6,766.50

7,347.90

6

PEKERJAAN PENGECATAN

6.7 Pengecatan Bidang Lama 6.8 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup 6.9 Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup 6.10 Pelaburan Bidang Kayu dg Teak Oil 6.11 Pelaburan Bidang Kayu dg Politur 6.12 Pelaburan Bidang Kayu dg Cat Residu & Ter 6.13 Pelaburan Bidang Kayu dg Vernis 6.14 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) 6.15 Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup)

413095359.xls

MINIMUM

m2

6.3 Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm

XIV 03-24

SAT

6.16 Memasang Kawat Nyamuk

6

03-7395-2008

URAIAN PEKERJAAN

15

sat.pekerjaan

DAFTAR SUMBER DATA D A E R A H

: :

ANALISA

PE K E R JAAN

PASARAN B E BAS KOTA SEMARANG EDISI KEDUA 2012

HARGA BAHAN/UPAH No.

SNI

I

03-2835-2002

KODE

KOEF

URAIAN PAKERJAAN

SAT.

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN PERSIAPAN 6.2

1

m'

6.2.1 1.25

463,066.25

428,390.00

439,426.25 22,500.00

2.5

Kg

1.2

Lbr Seng Gelombang 3" - 5"

Portalnd Semen

18,000.00

21,250.00

1,050.00

1,062.50

2,625.00

2,656.25

65,000.00

67,000.00

78,000.00

80,400.00

m3 Pasir Beton

140,000.00

150,000.00

700.00

750.00

0.009

m3 Koral Beton

115,000.00

120,000.00

1,035.00

1,080.00

0.072

m3 Kayu 5/7X4m Kayu Kruing

331,200.00

4,500,000.00

4,600,000.00

324,000.00

0.06

Kg

Paku Biasa 2" - 5"

13,000.00

14,000.00

780.00

840.00

0.45

Kg

Meni Besi

13,000.00

18,000.00

5,850.00

8,100.00

21,760.00

23,640.00

Tenaga 0.2

OH Tukang Kayu

40,000.00

43,000.00

8,000.00

8,600.00

0.4

OH Pekerja

30,000.00

33,000.00

12,000.00

13,200.00

0.02

OH Kepala Tukang

45,000.00

47,000.00

900.00

940.00

0.02

OH Mandor

43,000.00

45,000.00

860.00

900.00

Pengukuran dan Pemasangan Bouwplank

93,425.00

97,375.00

Bahan

85,760.00

89,080.00 55,200.00

1 0.012 0.02 0.007

m'

m3 Kayu 5/7x 4m Kayu Kruing Kg

Paku Biasa 2" - 5"

m3 Kayu Papan 3/20 Kruing

6.4.2

4,500,000.00

4,600,000.00

54,000.00

13,000.00

14,000.00

260.00

280.00

4,500,000.00

4,800,000.00

31,500.00

33,600.00

7,665.00

8,295.00

0.1

OH Tukang Kayu

Tenaga 40,000.00

43,000.00

4,000.00

4,300.00

0.1

OH Pekerja

30,000.00

33,000.00

3,000.00

3,300.00

OH Kepala Tukang

45,000.00

47,000.00

450.00

470.00

OH Mandor

43,000.00

45,000.00

215.00

225.00

506,785.00

552,587.50

311,135.00

341,237.50

0.01 0.005 1

m2 Pembuatan Kantor Sementara dg Lantai Plesteran

6.5.1

Bahan 1.25

Btg Kayu Dolken Ø 8 - 10 / 4 m

0.18

m3 Kayu

0.85

Kg

1.1

Kg Kg

Portland Sement

35

17,000.00

18,000.00

21,250.00

22,500.00

750,000.00

850,000.00

135,000.00

153,000.00

Paku Biasa 2" - 5"

13,000.00

14,000.00

11,050.00

11,900.00

Besi Strip

11,000.00

12,000.00

12,100.00

13,200.00

1,050.00

1,062.50

36,750.00

37,187.50

m3 Pasir pasang

125,000.00

140,000.00

18,750.00

21,000.00

0.1

m3 Pasir Beton

140,000.00

150,000.00

14,000.00

15,000.00

0.15

m3 Koral Beton

115,000.00

120,000.00

17,250.00

18,000.00

400.00

450.00

12,000.00

13,500.00

Lbr Seng Plat

18,000.00

20,000.00

4,500.00

5,000.00

2 buah Jendela Naco

7,000.00

7,500.00

14,000.00

15,000.00

50,000.00

55,000.00

4,000.00

4,400.00

45,000.00

50,000.00

6,750.00

7,500.00

2,250.00

2,500.00

675.00

750.00

51,000.00

55,000.00

3,060.00

3,300.00

0.15

30 buah Batu bata Merah 0.25 0.08

m2 Kaca Polos

0.15 buah Kunci Tanam 0.3 buah Engsel 0.06

Lbr Plywood 4 mm

6.5.2

195,650.00

211,350.00

2

OH Tukang Kayu

Tenaga 40,000.00

43,000.00

80,000.00

86,000.00

1

OH Tukang Batu

40,000.00

43,000.00

40,000.00

43,000.00

2

OH Pekerja

30,000.00

33,000.00

60,000.00

66,000.00

OH Kepala Tukang

45,000.00

47,000.00

13,500.00

14,100.00

OH Mandor

43,000.00

45,000.00

2,150.00

2,250.00

429,475.00

465,806.25

308,325.00

335,156.25

0.3 0.05 6.6

17,000.00

0.005

6.4.1

6.5

450,150.00

Bahan Btg Kayu Dolken diameter 8 - 10 / 400 cm

6.2.2

6.4

Pagar Sementara dari Seng Gelombang Tinggi 2,00 m

1

m2 Pembuatan Gudang Semen dan Alat-alat

6.6.1

Bahan 1.7 0.21

Btg Kayu Dolken diameter 8 - 10 / 400 cm m3 Kayu

17,000.00

18,000.00

28,900.00

30,600.00

750,000.00

850,000.00

157,500.00

178,500.00

13,000.00

14,000.00

3,900.00

4,200.00

1,050.00

1,062.50

11,025.00

11,156.25 4,200.00

0.3

Kg

Paku Biasa 2" - 5"

10.5

Kg

Portland Semen

0.03

m3 Pasir Beton

125,000.00

140,000.00

3,750.00

0.05

m3 Koral Beton

115,000.00

120,000.00

5,750.00

6,000.00

65,000.00

67,000.00

97,500.00

100,500.00

1.5

Lbr Seng Gelombang BJLS 32

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.6.2

Tenaga

MAKSIMUM Rp

121,150.00

130,650.00

43,000.00

80,000.00

86,000.00

1

OH Pekerja

30,000.00

33,000.00

30,000.00

33,000.00

OH Kepala Tukang

45,000.00

47,000.00

9,000.00

9,400.00

OH Mandor

43,000.00

45,000.00

2,150.00

2,250.00

5,150.00

5,550.00

5,150.00

5,550.00

1

m2 Membersihkan Lapangan dan Perataan Tenaga

0.1

OH Pekerja

30,000.00

33,000.00

3,000.00

3,300.00

0.05

OH Mandor

43,000.00

45,000.00

2,150.00

2,250.00

22,820.90

27,462.50

1 m2

6.11.1

Pembuatan Steger dari Bambu Uk. 40 x 50 x 20 cm Bahan

1

8,375.00

11,750.00

Btg Bambu diameter 6 - 8 / 600 cm

7,000.00

10,000.00

7,000.00

10,000.00

0.25

Kg

5,500.00

7,000.00

1,375.00

1,750.00

14,445.90

15,712.50

0.17

OH Tukang Kayu

40,000.00

43,000.00

6,800.00

7,310.00

0.25

OH Pekerja

30,000.00

33,000.00

7,500.00

8,250.00

OH Kepala Tukang

45,000.00

47,000.00

90.00

94.00

OH Mandor

43,000.00

45,000.00

55.90

58.50

214,329.00

234,996.00

214,329.00

234,996.00

6.11.2

Tali Ijuk Tenaga

0.002 0.0013 1

6.13.2

6.14

JUMLAH MINIMUM Rp

40,000.00

6.8.2

6.13

MAKSIMUM Rp

OH Tukang Kayu

0.05

6.11

MINIMUM Rp

2 0.2

6.8

URAIAN PAKERJAAN

SAT.

m3 Bongkaran Beton Bertulang Tenaga

6.667

OH Pekerja

30,000.00

33,000.00

200,010.00

220,011.00

0.333

OH Mandor

43,000.00

45,000.00

14,319.00

14,985.00

201,429.00

221,496.00

201,429.00

221,496.00

1

6.14.2

m3 Bongkaran Dinding Tembok Bata Merah Tenaga

6.667

OH Pekerja

30,000.00

33,000.00

200,010.00

220,011.00

0.033

OH Mandor

43,000.00

45,000.00

1,419.00

1,485.00

HARGA BAHAN/UPAH No.

SNI

II

03-2835 - 2008

KODE

KOEF

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN TANAH 6.1 6.1.2

6.2 6.2.2

6.3 6.3.2

6.4 6.4.2

6.5 6.5.2

6.6 6.6.2

6.7 6.7.2

6.8 6.8.2

1

m3

0.75 0.025

OH OH

1

m3

0.90 0.045

OH OH

1

m3

1.05 0.067

OH OH

1

m3

1.000 0.032

OH OH

1

m3

1.50 0.060

OH OH

1

m3

1.200 0.045

OH OH

1

m2

0.05 0.005

OH OH

1

m3

Menggali Tanah Biasa Sedalam 1 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Menggali Tanah Biasa Sedalam 2 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Menggali Tanah Biasa Sedalam 3 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Menggali Tanah Keras Sedalam 1 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Menggali Tanah Cadas Sedalam 1 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Menggali Tanah Lumpur Sedalam 1 m Tenaga Pekerja Mandor

30,000.00 43,000.00

Mengerjakan Striping Tebing Setinggi 1 m Tenaga Pekerja Mandor

0.330 0.010

OH OH

MembuangTanah sejauh 30 m' Tenaga Pekerja Mandor

6.9

1

m3

Urugan Kembali (dihitung 1/3 kali indeks pekerjaan galian)

6.10 6.10.2

1

m3

0.5 0.05

OH OH

Pemadatan Tanah (per 20 cm) Tenaga Pekerja Mandor

1

m3

1.2

6.11 6.11.1

6.12 6.12.1

30,000.00 43,000.00

33,000.00 45,000.00

28,935.00 28,935.00 27,000.00 1,935.00

31,725.00 31,725.00 29,700.00 2,025.00

33,000.00 45,000.00

34,381.00 34,381.00 31,500.00 2,881.00

37,665.00 37,665.00 34,650.00 3,015.00

33,000.00 45,000.00

31,376.00 31,376.00 30,000.00 1,376.00

34,440.00 34,440.00 33,000.00 1,440.00

33,000.00 45,000.00

47,580.00 47,580.00 45,000.00 2,580.00

52,200.00 52,200.00 49,500.00 2,700.00

33,000.00 45,000.00

37,935.00 37,935.00 36,000.00 1,935.00

41,625.00 41,625.00 39,600.00 2,025.00

33,000.00 45,000.00

1,715.00 1,715.00 1,500.00 215.00

1,875.00 1,875.00 1,650.00 225.00

33,000.00 45,000.00

10,330.00 10,330.00 9,900.00 430.00

11,340.00 11,340.00 10,890.00 450.00

33,000.00 45,000.00

17,150.00 17,150.00 15,000.00 2,150.00

18,750.00 18,750.00 16,500.00 2,250.00 112,350.00 102,000.00 102,000.00

m3

75,000.00

85,000.00

0.3 0.01

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

9,430.00 9,000.00 430.00

10,350.00 9,900.00 450.00

1

m3

0.40 0.135 0.948

m3 m3 m3

Lapisan Pudel Cmp. 1Kp : 3Ps : 7TL Bahan Pasir Pasang Kapur Padam Tanah Liat

125,000.00 195,000.00 45,000.00

140,000.00 210,000.00 50,000.00

164,225.00 118,985.00 50,000.00 26,325.00 42,660.00

180,830.00 131,750.00 56,000.00 28,350.00 47,400.00

0.800 0.400 0.04 0.080

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

45,240.00 24,000.00 16,000.00 1,800.00 3,440.00

49,080.00 26,400.00 17,200.00 1,880.00 3,600.00

1

m2

6.0

kg

Pemasangan Lapisan Ijuk tebal 10 cm Bahan Ijuk

5,500.00

7,000.00

38,145.00 33,000.00 33,000.00

47,625.00 42,000.00 42,000.00

0.15 0.015

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

5,145.00 4,500.00 645.00

5,625.00 4,950.00 675.00

1

m3

1.2

m3

Mengurug Sirtu Padat untuk Peninggian Lantai Bangunan Bahan Sirtu

115,000.00

120,000.00

146,575.00 138,000.00 138,000.00

153,375.00 144,000.00 144,000.00

0.25 0.025

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

8,575.00 7,500.00 1,075.00

9,375.00 8,250.00 1,125.00

6.14.2

6.15 6.15.1

30,000.00 43,000.00

25,875.00 25,875.00 24,750.00 1,125.00

99,430.00 90,000.00 90,000.00

6.12.2

6.14 6.14.1

30,000.00 43,000.00

33,000.00 45,000.00

23,575.00 23,575.00 22,500.00 1,075.00

Urugan Pasir Bahan Pasir Urug

6.11.2

6.15.2

413095359.xls

URAIAN PAKERJAAN

SAT.

53/18

abk 2-14

HARGA BAHAN/UPAH No.

SNI

III

03-2835 - 2008

KODE

KOEF

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN PONDASI 6.1 6.1.1

1

m3

1.2 202 0.485

m3 Kg m3

Memasang Pondasi Batu Kali 1Pc : 3 PP Bahan Batu Belah 15/20 Portland Sement Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

1.2 163 0.52

m3 Kg m3

Memasang Pondasi Batu Kali 1Pc : 4 PP Bahan Batu Belah 15/20 Portland Sement Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

1.2 136 0.544

m3 Kg m3

Memasang Pondasi Batu Kali 1Pc : 5 PP Bahan Batu Belah 15/20 Portland Sement Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

1.2 117 0.561

m3 Kg m3

Memasang Pondasi Batu Kali 1Pc : 6 PP Bahan Batu Belah 15/20 Portland Sement Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

1.2 91 0.584

m3 Kg m3

Memasang Pondasi Batu Kali 1Pc : 8 PP Bahan Batu Belah 15/20 Portland Sement Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

1.2 0.17 0.17 0.340

m3 m3 Kg m3

Memasang Pondasi Batu Kali 1Kp : 1Sm : 2Pp Bahan Batu Belah 15/20 Kapur Pasang (KP) Semen Merah (SM) Pasir Pasang

1.5 0.750 0.075 0.075

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

6.1.2

6.2 6.2.1

6.2.2

6.3 6.3.1

6.3.2

6.4 6.4.1

6.4.2

6.5 6.5.1

6.5.2

6.6 6.6.1

6.6.2

6.7 6.7.1

1.2 61 0.147 0.492

m3 kg m3 m3

6.7.2 .

413095359.xls

URAIAN PAKERJAAN

SAT.

1.5 0.750 0.075 0.075

OH OH OH OH

Memasang Pondasi Batu Kali, 1 Pc : 3 Kp : 10 PP Bahan Batu Belah 15/20 Portland Sement Kapur Pasang Pasir Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

53/19

120,000.00 1,050.00 125,000.00

130,000.00 1,062.50 140,000.00

498,325.00 416,725.00 144,000.00 212,100.00 60,625.00

527,175.00 438,525.00 156,000.00 214,625.00 67,900.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 1,050.00 125,000.00

130,000.00 1,062.50 140,000.00

461,750.00 380,150.00 144,000.00 171,150.00 65,000.00

490,637.50 401,987.50 156,000.00 173,187.50 72,800.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 1,050.00 125,000.00

130,000.00 1,062.50 140,000.00

436,400.00 354,800.00 144,000.00 142,800.00 68,000.00

465,310.00 376,660.00 156,000.00 144,500.00 76,160.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 1,050.00 125,000.00

130,000.00 1,062.50 140,000.00

418,575.00 336,975.00 144,000.00 122,850.00 70,125.00

447,502.50 358,852.50 156,000.00 124,312.50 78,540.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 1,050.00 125,000.00

130,000.00 1,062.50 140,000.00

394,150.00 312,550.00 144,000.00 95,550.00 73,000.00

423,097.50 334,447.50 156,000.00 96,687.50 81,760.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 195,000.00 120,000.00 125,000.00

130,000.00 210,000.00 150,000.00 140,000.00

321,650.00 240,050.00 144,000.00 33,150.00 20,400.00 42,500.00

353,450.00 264,800.00 156,000.00 35,700.00 25,500.00 47,600.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 1,050.00 195,000.00 125,000.00

130,000.00 1,062.50 210,000.00 140,000.00

379,815.00 298,215.00 144,000.00 64,050.00 28,665.00 61,500.00

409,212.50 320,562.50 156,000.00 64,812.50 30,870.00 68,880.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

abk 3-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.8 6.8.1

KOEF 1 1.2 41 0.131 0.492

m3 m3 kg m3 m3

6.8.2 .

6.9 6.9.1

6.9.2 .

6.10 6.10.1

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

120,000.00 1,050.00 195,000.00 125,000.00

130,000.00 1,062.50 210,000.00 140,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

81,600.00 45,000.00 30,000.00 3,375.00 3,225.00

88,650.00 49,500.00 32,250.00 3,525.00 3,375.00

120,000.00 75,000.00

130,000.00 85,000.00

218,832.00 176,400.00 144,000.00 32,400.00

238,818.00 192,720.00 156,000.00 36,720.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

42,432.00 23,400.00 15,600.00 1,755.00 1,677.00

46,098.00 25,740.00 16,770.00 1,833.00 1,755.00

130,000.00 10,000.00 1,062.50 150,000.00 120,000.00 15,000.00

1,663,375.00 1,517,100.00 57,600.00 1,134,000.00 203,700.00 43,680.00 53,820.00 24,300.00

1,817,980.00 1,658,485.00 62,400.00 1,260,000.00 206,125.00 46,800.00 56,160.00 27,000.00

33,000.00 43,000.00 47,000.00 45,000.00

146,275.00 102,000.00 34,000.00 3,825.00 6,450.00

159,495.00 112,200.00 36,550.00 3,995.00 6,750.00

120,000.00 1,050.00 140,000.00 115,000.00

130,000.00 1,062.50 150,000.00 120,000.00

467,917.00 355,200.00 54,000.00 203,700.00 43,680.00 53,820.00

490,300.00 367,585.00 58,500.00 206,125.00 46,800.00 56,160.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

112,717.00 72,000.00 32,000.00 3,600.00 5,117.00

122,715.00 79,200.00 34,400.00 3,760.00 5,355.00

1

m3

1.2 0.432

m3 m3

Pasang Pondasi Batu Kosong Bahan Batu Belah 15/20 Pasir Urug

0.78 0.39 0.039 0.039

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

0.480 126 194 0.312 0.468 1.8

m3

Kg Kg m3 m3 Kg

Pasang Pondasi Siklop, 60% Beton Camp. 1PC : 2PB : 3KR & 40% Batu Belah Bahan Batu Belah 15/20 cm 120,000.00 Besi Beton 9,000.00 Portland Semen 1,050.00 Pasir Beton 140,000.00 Koral Beton 115,000.00 Kawat Beton 13,500.00

3.4 0.85 0.085 0.15

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

0.45 194 0.312 0.468

m3 Kg m3 m3

Pasang Pondasi Sumuran diameter 100 cm Bahan Batu Belah 15/20 cm Portland Semen Pasir Beton Koral Beton

2.40 0.8 0.08 0.119

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

53/20

MAKSIMUM Rp

JUMLAH MINIMUM Rp 355,695.00 274,095.00 144,000.00 43,050.00 25,545.00 61,500.00

OH OH OH OH

6.11.2

413095359.xls

Memasang Pondasi Batu Kali, ¼ Pc : 1Kp : 4 PP Bahan Batu Belah 15/20 Portland Sement Kapur Pasang Pasir

MINIMUM Rp

1.5 0.750 0.075 0.075

6.10.2

6.11 6.11.1

URAIAN PAKERJAAN

SAT.

MAKSIMUM Rp 384,602.50 295,952.50 156,000.00 43,562.50 27,510.00 68,880.00

abk 3-14

HARGA BAHAN/UPAH No.

SNI

IV

03-6897 - 2008

KODE

KOEF

P E K E R JAAN 6.1 6.1.1

1 m2 140 43.5 0.08

Buah Kg m3

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

6.1.2

6.2 6.2.1

140 32.95 0.091

Buah Kg m3

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

6.2.2

6.3 6.3.1

140 26.55 0.093

Buah Kg m3

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

6.3.2

6.4 6.4.1

140 22.2 0.102

Buah Kg m3

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

6.4.2

6.5 6.5.1

140 18.5 0.122

Buah Kg m3

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

6.5.2

6.6 6.6.1

140 10.08 0.0925 0.0275

Buah Kg m3 m3

6.6.2

6.7 6.7.1

0.6 0.2 0.02 0.03

OH OH OH OH

1

m2

70 18.95 0.038

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

6.7.2

413095359.xls

URAIAN PAKERJAAN

SAT.

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

DINDING

Memasang Dinding Bata Merah ukuran (5x11x22) cm Tebal 1 bata Camp. 1Pc : 2Pp Bahan Bata Merah 400.00 Portland Semen (PC) 1,050.00 Pasir Pasang (PP) 125,000.00

450.00 1,062.50 140,000.00

139,865.00 111,675.00 56,000.00 45,675.00 10,000.00

151,108.75 120,418.75 63,000.00 46,218.75 11,200.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

450.00 1,062.50 140,000.00

130,162.50 101,972.50 56,000.00 34,597.50 11,375.00

141,439.38 110,749.38 63,000.00 35,009.38 12,740.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

450.00 1,062.50 140,000.00

123,692.50 95,502.50 56,000.00 27,877.50 11,625.00

134,919.38 104,229.38 63,000.00 28,209.38 13,020.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

450.00 1,062.50 140,000.00

120,250.00 92,060.00 56,000.00 23,310.00 12,750.00

131,557.50 100,867.50 63,000.00 23,587.50 14,280.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

450.00 1,062.50 140,000.00

118,865.00 90,675.00 56,000.00 19,425.00 15,250.00

130,426.25 99,736.25 63,000.00 19,656.25 17,080.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3 KP :10PP Bahan Bata Merah 400.00 450.00 Portland Semen (PC) 1,050.00 1,062.50 Pasir Pasang (PP) 125,000.00 140,000.00 Kapur Pasang (KP) 195,000.00 210,000.00

111,699.00 83,509.00 56,000.00 10,584.00 11,562.50 5,362.50

123,125.00 92,435.00 63,000.00 10,710.00 12,950.00 5,775.00

33,000.00 43,000.00 47,000.00 45,000.00

28,190.00 18,000.00 8,000.00 900.00 1,290.00

30,690.00 19,800.00 8,600.00 940.00 1,350.00

450.00 1,062.50 140,000.00

66,742.50 52,647.50 28,000.00 19,897.50 4,750.00

72,299.38 56,954.38 31,500.00 20,134.38 5,320.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 3PP Bahan Bata Merah 400.00 Portland Semen (PC) 1,050.00 Pasir Pasang (PP) 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 4PP Bahan Bata Merah 400.00 Portland Semen (PC) 1,050.00 Pasir Pasang (PP) 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 5PP Bahan Bata Merah 400.00 Portland Semen (PC) 1,050.00 Pasir Pasang (PP) 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1Pc : 6PP Bahan Bata Merah 400.00 Portland Semen (PC) 1,050.00 Pasir Pasang (PP) 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Tenaga Pekerja Tukang Batu Kepala Tukang Batu Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 2PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

53/21

abk 4-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.8 6.8.1

KOEF

SAT. 1

m2

70 14.37 0.04

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

1

m2

6.8.2

6.9 6.9.1

70 11.50 0.043

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

1

m2

6.9.2

6.10 6.10.1

70 9.68 0.045

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

1

m2

6.10.2

6.11 6.11.1

70 8.32 0.049

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

1

m2

6.11.2

6.12 6.12.1

70 6.50 0.05

Buah Kg m3

0.30 0.1 0.01 0.015

OH OH OH OH

1

m2

6.12.2

6.13 6.13.1

70 4.5 0.05 0.015

Buah Kg m3 m3

0.30 0.1 0.01 0.015

OH OH OH OH

6.13.2

413095359.xls

URAIAN PAKERJAAN

MINIMUM Rp Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00

JUMLAH

450.00 1,062.50 140,000.00

MINIMUM Rp 62,183.50 48,088.50 28,000.00 15,088.50 5,000.00

MAKSIMUM Rp 67,713.13 52,368.13 31,500.00 15,268.13 5,600.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

450.00 1,062.50 140,000.00

59,545.00 45,450.00 28,000.00 12,075.00 5,375.00

65,083.75 49,738.75 31,500.00 12,218.75 6,020.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

450.00 1,062.50 140,000.00

57,884.00 43,789.00 28,000.00 10,164.00 5,625.00

63,430.00 48,085.00 31,500.00 10,285.00 6,300.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

450.00 1,062.50 140,000.00

56,956.00 42,861.00 28,000.00 8,736.00 6,125.00

62,545.00 47,200.00 31,500.00 8,840.00 6,860.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

450.00 1,062.50 140,000.00

55,170.00 41,075.00 28,000.00 6,825.00 6,250.00

60,751.25 45,406.25 31,500.00 6,906.25 7,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 3KP : 10PP Bahan Bata Merah 5 x 11 x 22 400.00 450.00 Portland Semen 1,050.00 1,062.50 Pasir Pasang 125,000.00 140,000.00 Kapur Padam 195,000.00 210,000.00

55,995.00 41,900.00 28,000.00 4,725.00 6,250.00 2,925.00

61,776.25 46,431.25 31,500.00 4,781.25 7,000.00 3,150.00

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 4PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 6PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 8PP Bahan Bata Merah 5 x 11 x 22 400.00 Portland Semen 1,050.00 Pasir Pasang 125,000.00 Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

30,000.00 40,000.00 45,000.00 43,000.00

53/22

MAKSIMUM Rp

33,000.00 43,000.00 47,000.00 45,000.00

abk 4-14

HARGA BAHAN/UPAH No.

SNI

V

03-2837 - 2008

KODE

KOEF

PEKERJAAN 6.1 6.1.1

6.2 6.2.1

m2

15.504 0.016

Kg m3

Memasang Plesteran 1 Pc : 1 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

10.224 0.020

Kg m3

Memasang Plesteran 1 Pc : 2 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

7.776 0.023

Kg m3

Memasang Plesteran 1 Pc : 3 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

6.240 0.024

Kg m3

Memasang Plesteran 1 Pc : 4 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

5.184 0.026

Kg m3

Memasang Plesteran 1 Pc : 5 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

4.416 0.027

Kg m3

Memasang Plesteran 1 Pc : 6 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

3.936 0.028

Kg m3

Memasang Plesteran 1 Pc : 7 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

3.456 0.029

Kg m3

Memasang Plesteran 1 Pc : 8 Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.30 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

5.760 0.003 0.013

Kg m3 m3

6.2.2

6.3 6.3.1

6.3.2

6.4 6.4.1

6.4.2

6.5 6.5.1

6.5.2

6.6 6.6.1

6.6.2

6.7 6.7.1

6.7.2

6.8 6.8.1

6.8.2

6.9 6.9.1

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PLESTERAN

1

6.1.2

413095359.xls

URAIAN PAKERJAAN

SAT.

Memasang Plesteran 1 Pc : 1/2 Kp : 3 Pp Tebal 15 mm Bahan Portland Semen Kapur Pasang Pasir Pasang

53/23

1,050.00 125,000.00

1,062.50 140,000.00

34,599.20 18,279.20 16,279.20 2,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

29,555.20 13,235.20 10,735.20 2,500.00

31,393.00 13,663.00 10,863.00 2,800.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

27,359.80 11,039.80 8,164.80 2,875.00

29,212.00 11,482.00 8,262.00 3,220.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

25,872.00 9,552.00 6,552.00 3,000.00

27,720.00 9,990.00 6,630.00 3,360.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

25,013.20 8,693.20 5,443.20 3,250.00

26,878.00 9,148.00 5,508.00 3,640.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

24,331.80 8,011.80 4,636.80 3,375.00

26,202.00 8,472.00 4,692.00 3,780.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00

30,000.00 40,000.00 45,000.00 43,000.00

1,050.00 125,000.00

1,062.50 140,000.00

23,952.80 7,632.80 4,132.80 3,500.00

25,832.00 8,102.00 4,182.00 3,920.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00 125,000.00

1,062.50 140,000.00

23,573.80 7,253.80 3,628.80 3,625.00

25,462.00 7,732.00 3,672.00 4,060.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,062.50 210,000.00 140,000.00

25,172.00 8,258.00 6,048.00 585.00 1,625.00

26,984.00 8,570.00 6,120.00 630.00 1,820.00

1,050.00 195,000.00 125,000.00

36,443.00 18,713.00 16,473.00 2,240.00

9,900.00 6,450.00 705.00 675.00

abk 5-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.9.2

6.10 6.10.1

URAIAN PAKERJAAN

SAT.

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

0.36 0.12 0.012 0.018

OH OH OH OH

1

m2

3 0.005 0.020

kg m3 m3

Memasang Plesteran 1 Pc : 2 Kp : 8 Pp Tebal 15 mm Bahan Portland Semen Kapur Padam Pasir Pasang

0.36 0.12 0.012 0.018

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

0.009 0.009 0.009

m3 m3 m3

Memasang Plesteran 1 SM : 1 Kp : 1 Pp Tebal 15 mm Bahan Semen Merah Kapur Padam Pasir Pasang

0.36 0.12 0.012 0.018

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

0.007 0.007 0.015

m3 m3 m3

Memasang Plesteran 1 SM : 1 Kp : 2 Pp Tebal 15 mm Bahan Semen Merah Kapur Padam Pasir Pasang

0.36 0.12 0.012 0.018

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

13.632 0.027

kg m3

Memasang Plesteran 1 Pc : 2 Pp Tebal 20 mm Bahan Portland Semen Pasir Pasang

0.40 0.20 0.020 0.022

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

10.368 0.031

Kg m3

Memasang Plesteran 1Pc : 3Pp Tebal 20 mm Bahan Portland Semen Pasir Pasang

0.26 0.2 0.02 0.013

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

8.320 0.032

kg m3

Memasang Plesteran 1 Pc : 4 Pp Tebal 20 mm Bahan Portland Semen Pasir Pasang

0.40 0.20 0.020 0.022

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

6.912 0.035

Kg m3

Memasang Plesteran 1Pc : 5Pp Tebal 20 mm Bahan Portland Semen Pasir Pasang

0.400 0.200 0.020 0.022

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

5.888 0.036

Kg m3

6.10.2

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

33,000.00 43,000.00 47,000.00 45,000.00

16,914.00 10,800.00 4,800.00 540.00 774.00

18,414.00 11,880.00 5,160.00 564.00 810.00

1,050.00 195,000.00 125,000.00

1,062.50 210,000.00 140,000.00

23,539.00 6,625.00 3,150.00 975.00 2,500.00

25,451.50 7,037.50 3,187.50 1,050.00 2,800.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,914.00 10,800.00 4,800.00 540.00 774.00

18,414.00 11,880.00 5,160.00 564.00 810.00

120,000.00 195,000.00 125,000.00

150,000.00 210,000.00 140,000.00

20,874.00 3,960.00 1,080.00 1,755.00 1,125.00

22,914.00 4,500.00 1,350.00 1,890.00 1,260.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,914.00 10,800.00 4,800.00 540.00 774.00

18,414.00 11,880.00 5,160.00 564.00 810.00

120,000.00 195,000.00 125,000.00

150,000.00 210,000.00 140,000.00

20,994.00 4,080.00 840.00 1,365.00 1,875.00

23,034.00 4,620.00 1,050.00 1,470.00 2,100.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,914.00 10,800.00 4,800.00 540.00 774.00

18,414.00 11,880.00 5,160.00 564.00 810.00

1,050.00 125,000.00

1,062.50 140,000.00

39,534.60 17,688.60 14,313.60 3,375.00

41,994.00 18,264.00 14,484.00 3,780.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,846.00 12,000.00 8,000.00 900.00 946.00

23,730.00 13,200.00 8,600.00 940.00 990.00

1,050.00 125,000.00

1,062.50 140,000.00

32,020.40 14,761.40 10,886.40 3,875.00

34,061.00 15,356.00 11,016.00 4,340.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

17,259.00 7,800.00 8,000.00 900.00 559.00

18,705.00 8,580.00 8,600.00 940.00 585.00

1,050.00 125,000.00

1,062.50 140,000.00

34,582.00 12,736.00 8,736.00 4,000.00

37,050.00 13,320.00 8,840.00 4,480.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,846.00 12,000.00 8,000.00 900.00 946.00

23,730.00 13,200.00 8,600.00 940.00 990.00

1,050.00 125,000.00

1,062.50 140,000.00

33,478.60 11,632.60 7,257.60 4,375.00

35,974.00 12,244.00 7,344.00 4,900.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,846.00 12,000.00 8,000.00 900.00 946.00

23,730.00 13,200.00 8,600.00 940.00 990.00

1,062.50 140,000.00

32,528.40 10,682.40 6,182.40 4,500.00

35,026.00 11,296.00 6,256.00 5,040.00

30,000.00 40,000.00 45,000.00 43,000.00

\

6.11 6.11.1

6.11.2

6.12 6.12.1

6.12.2

6.13 6.13.1

6.13.2

6.14 6.14.1

6.14.2

6.15 6.15.1

6.15.2

6.16 6.16.1

6.16.2

6.17 6.17.1

413095359.xls

Memasang Plesteran 1Pc : 6Pp Tebal 20 mm Bahan Portland Semen Pasir Pasang

53/24

1,050.00 125,000.00

abk 5-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.17.2

6.18 6.18.1

OH OH OH OH

1

m2

0.009 0.009 0.018

m3 m3 m3

Memasang Plesteran 1 SM : 2 Kp : 2 Pp Tebal 20 mm Bahan Semen Merah Kapur Padam Pasir Pasang

0.440 0.22 0.022 0.022

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

5.184 0.026

Kg m3

Memasang Berapen 1 Pc : 5Pp Tebal 15 mm Bahan Portland Semen Pasir Pasang

0.15 0.075 0.008 0.008

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m'

0.5 0.013

Kg m3

Memasang Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm Bahan Portland Semen Pasir Pasang

0.080 0.40 0.040 0.004

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

4.32 0.006

Kg m3

Memasang Plesteran Ciprat 1Pc : 2 Pp Bahan Portland Semen Pasir Pasang

0.30 0.1 0.01 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

3.108

Kg

Memasang Finishing Siar Pasangan Dinding Bata Merah (=20 m') Bahan Portland Semen

0.15 0.075 0.008 0.008

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

1.600

Kg

Memasang Finishing Siar Pasangan Dinding Conblock ekspose (=8 m') Bahan Portland Semen

0.070 0.035 0.004 0.004

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

1

m2

6.34 0.012

Kg m3

Memasang Finishing Siar Pas.Batu Kali Adukan 1Pc : 2Pp Bahan Pc PP

0.3 0.15 0.015 0.015

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

6.19.2

6.20 6.20.1

6.20.2

6.23 6.23.1

6.23.2

6.24 6.24.1

6.24.2

6.25 6.25.1

6.25.2

6.26 6.26.1

6.26.2

6.27 6.27.1

1

m2

3.25

Kg

Memasang Acian Bahan Portland Semen

0.20 0.10 0.010 0.010

OH OH OH OH

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

6.27.2

413095359.xls

Tenaga Pekerja Tukang batu Kepala Tukang Mandor

0.40 0.2 0.02 0.022

6.18.2

6.19 6.19.1

URAIAN PAKERJAAN

SAT.

MINIMUM Rp

53/25

JUMLAH

33,000.00 43,000.00 47,000.00 45,000.00

MINIMUM Rp 21,846.00 12,000.00 8,000.00 900.00 946.00

MAKSIMUM Rp 23,730.00 13,200.00 8,600.00 940.00 990.00

120,000.00 195,000.00 125,000.00

150,000.00 210,000.00 140,000.00

29,021.00 5,085.00 1,080.00 1,755.00 2,250.00

31,764.00 5,760.00 1,350.00 1,890.00 2,520.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

23,936.00 13,200.00 8,800.00 990.00 946.00

26,004.00 14,520.00 9,460.00 1,034.00 990.00

1,050.00 125,000.00

1,062.50 140,000.00

16,897.20 8,693.20 5,443.20 3,250.00

18,059.00 9,148.00 5,508.00 3,640.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

8,204.00 4,500.00 3,000.00 360.00 344.00

8,911.00 4,950.00 3,225.00 376.00 360.00

1,050.00 125,000.00

1,062.50 140,000.00

22,522.00 2,150.00 525.00 1,625.00

24,251.25 2,351.25 531.25 1,820.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,372.00 2,400.00 16,000.00 1,800.00 172.00

21,900.00 2,640.00 17,200.00 1,880.00 180.00

1,050.00 125,000.00

1,062.50 140,000.00

19,381.00 5,286.00 4,536.00 750.00

20,775.00 5,430.00 4,590.00 840.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,095.00 9,000.00 4,000.00 450.00 645.00

15,345.00 9,900.00 4,300.00 470.00 675.00

1,050.00

1,062.50

11,467.40 3,263.40 3,263.40

12,213.25 3,302.25 3,302.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

8,204.00 4,500.00 3,000.00 360.00 344.00

8,911.00 4,950.00 3,225.00 376.00 360.00

1,050.00

1,062.50

5,532.00 1,680.00 1,680.00

5,883.00 1,700.00 1,700.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

3,852.00 2,100.00 1,400.00 180.00 172.00

4,183.00 2,310.00 1,505.00 188.00 180.00

1,050.00 125,000.00

1,062.50 140,000.00

24,477.00 8,157.00 6,657.00 1,500.00

26,146.25 8,416.25 6,736.25 1,680.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,320.00 9,000.00 6,000.00 675.00 645.00

17,730.00 9,900.00 6,450.00 705.00 675.00

1,050.00

1,062.50

14,292.50 3,412.50 3,412.50

15,273.13 3,453.13 3,453.13

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

10,880.00 6,000.00 4,000.00 450.00 430.00

11,820.00 6,600.00 4,300.00 470.00 450.00

30,000.00 40,000.00 45,000.00 43,000.00

MAKSIMUM Rp

abk 5-14

HARGA BAHAN/UPAH No.

SNI

VI

03-3434 - 2008

KODE

6.1

KOEF

m3

1.1 1.25 1

m3 kg kg

7 21 2.10 0.35

OH OH OH OH

1

m3

1.2 1.25 1

m3 kg kg

6.00 18.00 1.80 0.30

OH OH OH OH

1

m2

0.040 0.05

m3 Kg

Membuat Pintu KlampStandard Kayu Klas II (Kayu Kamfer) Bahan Kayu Klas II (Kamfer), papan Paku Biasa 2" - 5 "

0.35 1.05 0.105 0.018

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.04 0.050

m3 kg

1 3.0 0.30 0.05

OH OH OH OH

1

m2

0.024 0.300

m3 kg

0.800 2.400 0.240 0.040

OH OH OH OH

1

m2

0.064 0.5

m3 kg

1 3 0.3 0.05

OH OH OH OH

1

m2

0.025 0.030 0.500 1.000

m3 Kg Ltr Lbr

Membuat Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm) Bahan Kayu Klas II (Kamfer), papan 5,800,000.00 Paku Biasa 1/2" - 1" 13,000.00 Lem Kayu 18,000.00 Plywood tebal 4 mm uk.90x220cm 51,000.00

0.700 2.100 0.210 0.035

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.0256 0.03 0.5 1

m3 Kg Ltr Lbr

0.800 2.400 0.240 0.040

OH OH OH OH

6.1.2

6.2.2

6.3 6.3.1

6.3.2

6.5 6.5.1

6.5.2

6.6 6.6.1

6.6.2

6.7 6.7.1

6.7.2

6.8 6.8.1

6.8.2

6.9 6.9.1

6.9.2

413095359.xls

PEKERJAAN K A Y U Membuat Kosen Pintu & Jendela Kayu klas I Bahan Kayu Klas I (Jati) , Balok Paku Biasa 2" - 5 " Lem Kayu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MINIMUM Rp

1

6.1.2

6.2 6.2.1

URAIAN PAKERJAAN

SAT.

Membuat Kosen Pintu & Jendela Kayu klas II atau III Bahan Kayu Klas II (Kamfer) , Balok Paku Biasa 2" - 5 " Lem Kayu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

Membuat Daun Pintu Panel Kayu Klas I atau II Bahan Kayu Klas II (Kamfer), papan Lem Kayu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Membuat Pintu & Jendela Kaca Kayu Klas I atau II Bahan Kayu Klas II (Kamfer), papan Lem Kayu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Membuat Pintu & Jendela Jalusi Kayu Klas I atau II Bahan Kayu Klas I (Jati), papan Lem Kayu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

18,500,000.00 13,000.00 18,000.00

19,000,000.00 14,000.00 20,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

53/26

JUMLAH MINIMUM Rp

MAKSIMUM Rp

21,543,800.00 20,384,250.00 20,350,000.00 16,250.00 18,000.00 1,159,550.00 210,000.00 840,000.00 94,500.00 15,050.00

22,185,950.00 20,937,500.00 20,900,000.00 17,500.00 20,000.00 1,248,450.00 231,000.00 903,000.00 98,700.00 15,750.00 7,947,600.00 6,877,500.00 6,840,000.00 17,500.00 20,000.00 1,070,100.00 198,000.00 774,000.00 84,600.00 13,500.00

5,000,000.00 13,000.00 18,000.00

5,700,000.00 14,000.00 20,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,028,150.00 6,034,250.00 6,000,000.00 16,250.00 18,000.00 993,900.00 180,000.00 720,000.00 81,000.00 12,900.00

5,800,000.00 13,000.00

6,200,000.00 14,000.00

290,649.00 232,650.00 232,000.00 650.00

311,145.00 248,700.00 248,000.00 700.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

57,999.00 10,500.00 42,000.00 4,725.00 774.00

62,445.00 11,550.00 45,150.00 4,935.00 810.00

398,550.00 232,900.00 232,000.00 900.00 165,650.00 30,000.00 120,000.00 13,500.00 2,150.00

427,350.00 249,000.00 248,000.00 1,000.00 178,350.00 33,000.00 129,000.00 14,100.00 2,250.00

277,120.00 144,600.00 139,200.00 5,400.00 132,520.00 24,000.00 96,000.00 10,800.00 1,720.00

297,480.00 154,800.00 148,800.00 6,000.00 142,680.00 26,400.00 103,200.00 11,280.00 1,800.00 1,596,350.00 1,418,000.00 1,408,000.00 10,000.00 178,350.00 33,000.00 129,000.00 14,100.00 2,250.00

5,800,000.00 18,000.00

6,200,000.00 20,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,800,000.00 18,000.00

6,200,000.00 20,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,000,000.00 18,000.00

22,000,000.00 20,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,518,650.00 1,353,000.00 1,344,000.00 9,000.00 165,650.00 30,000.00 120,000.00 13,500.00 2,150.00

6,200,000.00 14,000.00 20,000.00 55,000.00

321,345.00 205,390.00 145,000.00 390.00 9,000.00 51,000.00

345,265.00 220,420.00 155,000.00 420.00 10,000.00 55,000.00

33,000.00 43,000.00 47,000.00 45,000.00

115,955.00 21,000.00 84,000.00 9,450.00 1,505.00

124,845.00 23,100.00 90,300.00 9,870.00 1,575.00

341,390.00 208,870.00 148,480.00 390.00 9,000.00 51,000.00 132,520.00 24,000.00 96,000.00 10,800.00 1,720.00

366,820.00 224,140.00 158,720.00 420.00 10,000.00 55,000.00 142,680.00 26,400.00 103,200.00 11,280.00 1,800.00

30,000.00 40,000.00 45,000.00 43,000.00

Membuat Pintu Plywood rangkap, rangka expose kayu klas I atau II Bahan Kayu Klas II (Kamfer), papan Paku Biasa 1/2" - 1" Lem Kayu Plywood tebal 4 mm uk.90x220cm Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MAKSIMUM Rp

5,800,000.00 13,000.00 18,000.00 51,000.00

6,200,000.00 14,000.00 20,000.00 55,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

abk 6-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.10 6.10.1

KOEF

413095359.xls

132,585.00 22,110.00 86,000.00 9,400.00 15,075.00

21,000,000.00 13,000.00 18,000.00 51,000.00

22,000,000.00 14,000.00 20,000.00 55,000.00

714,310.00 581,790.00 525,000.00 390.00 5,400.00 51,000.00

754,100.00 611,420.00 550,000.00 420.00 6,000.00 55,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

132,520.00 24,000.00 96,000.00 10,800.00 1,720.00

142,680.00 26,400.00 103,200.00 11,280.00 1,800.00

33,000.00 43,000.00 47,000.00 45,000.00

361,154.00 220,330.00 145,000.00 390.00 1,440.00 51,000.00 22,500.00 140,824.00 25,500.00 102,000.00 11,475.00 1,849.00

388,640.00 237,020.00 155,000.00 420.00 1,600.00 55,000.00 25,000.00 151,620.00 28,050.00 109,650.00 11,985.00 1,935.00

5,700,000.00 14,500.00 14,000.00

6,444,800.00 5,782,800.00 5,500,000.00 210,000.00 72,800.00

7,278,900.00 6,565,900.00 6,270,000.00 217,500.00 78,400.00

33,000.00 43,000.00 47,000.00 43,000.00

662,000.00 120,000.00 480,000.00 54,000.00 8,000.00

713,000.00 132,000.00 516,000.00 56,400.00 8,600.00

18,500,000.00 14,000.00 13,000.00

19,000,000.00 14,500.00 14,000.00

23,591,650.00 22,482,800.00 22,200,000.00 210,000.00 72,800.00

24,290,175.00 23,095,900.00 22,800,000.00 217,500.00 78,400.00

30,000.00 40,000.00 45,000.00 40,000.00

33,000.00 43,000.00 47,000.00 43,000.00

1,108,850.00 201,000.00 804,000.00 90,450.00 13,400.00

1,194,275.00 221,100.00 864,300.00 94,470.00 14,405.00

5,000,000.00 14,000.00 13,000.00

5,700,000.00 14,500.00 14,000.00

6,146,200.00 5,749,000.00 5,500,000.00 210,000.00 39,000.00

6,957,300.00 6,529,500.00 6,270,000.00 217,500.00 42,000.00

30,000.00 40,000.00 45,000.00 40,000.00

33,000.00 43,000.00 47,000.00 43,000.00

397,200.00 72,000.00 288,000.00 32,400.00 4,800.00

427,800.00 79,200.00 309,600.00 33,840.00 5,160.00

5,000,000.00 5,000,000.00 13,000.00

5,700,000.00 5,700,000.00 14,000.00

98,915.00 91,250.00 70,000.00 18,000.00 3,250.00

112,115.00 103,820.00 79,800.00 20,520.00 3,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,665.00 3,000.00 4,000.00 450.00 215.00

8,295.00 3,300.00 4,300.00 470.00 225.00

5,700,000.00 5,700,000.00 14,000.00

116,915.00 109,250.00 70,000.00 36,000.00 3,250.00

132,635.00 124,340.00 79,800.00 41,040.00 3,500.00

1

m2

0.025 0.03 0.3 1

m3 Kg kg Lbr

Membuat Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I Bahan Kayu Klas I (Jati), papan Paku Biasa 1/2" - 1" Lem Kayu Teakwood (90 x 220) cm x 4 mm

0.80 2.40 0.24 0.04

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.025 0.03 0.08 1 0.5

m3 Kg kg Lbr Lbr

0.850 2.550 0.255 0.043

OH OH OH OH

1

m3

1.1 15 5.6

m3 Kg Kg

Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter Bahan Kayu Kamfer, balok 5,000,000.00 Besi Strip 14,000.00 Paku Biasa 2" - 5" 13,000.00

4 12 1.2 0.2

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m3

1.2 15 5.6

m3 Kg Kg

Memasang Konstruksi Kuda-kuda Expose, Kayu Klas I Bahan Kayu Klas I (jati), balok Besi Strip Paku Biasa 2" - 5"

6.7 20.1 2.01 0.335

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m3

1.1 15 3

m3 Kg Kg

Memasang konstruksi Gording, Kayu Klas II Bahan Kayu Klas I (Kamfer), balok Besi Strip Paku Biasa 2" - 5"

2.4 7.2 0.72 0.12

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.014 0.0036 0.25

m3 m3 Kg

Memasang Rangka Atap Genteng Keramik, Kayu Klas II Bahan Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm Reng (2x3) cm Paku Biasa 2" - 5"

0.1 0.1 0.01 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.014 0.0072 0.25

m3 m3 Kg

6.16.2

6.17 6.17.1

123,505.00 20,100.00 80,000.00 9,000.00 14,405.00

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

6.15.2

6.16 6.16.1

33,000.00 43,000.00 47,000.00 45,000.00

OH OH OH OH

6.14.2

6.15 6.15.1

30,000.00 40,000.00 45,000.00 43,000.00

0.670 2.000 0.200 0.335

6.13.2

6.14 6.14.1

22,000,000.00 14,000.00

m3 Kg

6.12.2

6.13 6.13.1

21,000,000.00 13,000.00

0.06 0.15

Membuat Jalusi mati Kosen Kayu Klas I atau II Bahan Kayu Klas I (Jati), papan Paku Biasa 1/2" - 1"

Membuat Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II Bahan Kayu Klas II (Kamfer), papan 5,800,000.00 Paku Biasa 1/2" - 1" 13,000.00 Lem Kayu 18,000.00 Teakwood (90 x 220) cm x 4 mm 51,000.00 Formika 45,000.00 Tenaga Pekerja 30,000.00 Tukang Kayu 40,000.00 Kepala Tukang 45,000.00 Mandor 43,000.00

30,000.00 40,000.00 45,000.00 40,000.00

Memasang Rangka Atap Genteng Beton, Kayu Klas II Bahan Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm Reng (2x3) cm Paku Biasa 2" - 5"

53/27

5,000,000.00 5,000,000.00 13,000.00

MAKSIMUM Rp

JUMLAH MINIMUM Rp 1,385,455.00 1,261,950.00 1,260,000.00 1,950.00

m2

6.11.2

6.12 6.12.1

MINIMUM Rp

1

6.10.2

6.11 6.11.1

URAIAN PAKERJAAN

SAT.

6,200,000.00 14,000.00 20,000.00 55,000.00 50,000.00

MAKSIMUM Rp 1,454,685.00 1,322,100.00 1,320,000.00 2,100.00

abk 6-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.17.2

6.18 6.18.1

413095359.xls

9,198.00 3,600.00 4,800.00 540.00 258.00

9,954.00 3,960.00 5,160.00 564.00 270.00

5,000,000.00 13,000.00

5,700,000.00 14,000.00

100,675.00 79,600.00 77,000.00 2,600.00

113,215.00 90,580.00 87,780.00 2,800.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,075.00 4,500.00 12,000.00 1,350.00 3,225.00

22,635.00 4,950.00 12,900.00 1,410.00 3,375.00

5,000,000.00 13,000.00

5,700,000.00 14,000.00

104,530.00 84,750.00 81,500.00 3,250.00

117,770.00 96,410.00 92,910.00 3,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

19,780.00 6,000.00 12,000.00 1,350.00 430.00

21,360.00 6,600.00 12,900.00 1,410.00 450.00

21,000,000.00 13,000.00

22,000,000.00 14,000.00

240,215.00 228,100.00 226,800.00 1,300.00

252,065.00 239,000.00 237,600.00 1,400.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

12,115.00 3,000.00 8,000.00 900.00 215.00

13,065.00 3,300.00 8,600.00 940.00 225.00

5,800,000.00 13,000.00

6,200,000.00 14,000.00

76,565.00 64,450.00 63,800.00 650.00

81,965.00 68,900.00 68,200.00 700.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

12,115.00 3,000.00 8,000.00 900.00 215.00

13,065.00 3,300.00 8,600.00 940.00 225.00

5,700,000.00 14,000.00

166,819.00 141,950.00 140,000.00 1,950.00

188,475.00 161,700.00 159,600.00 2,100.00

33,000.00 43,000.00 47,000.00 45,000.00

24,869.00 4,500.00 18,000.00 2,025.00 344.00

26,775.00 4,950.00 19,350.00 2,115.00 360.00

5,000,000.00 13,000.00 51,000.00 18,000.00

5,700,000.00 14,000.00 55,000.00 20,000.00

220,759.00 195,890.00 140,000.00 1,950.00 43,860.00 10,080.00

246,975.00 220,200.00 159,600.00 2,100.00 47,300.00 11,200.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

24,869.00 4,500.00 18,000.00 2,025.00 344.00

26,775.00 4,950.00 19,350.00 2,115.00 360.00

22,000,000.00 14,000.00 15,000.00

249,715.00 150,325.00 147,000.00 1,300.00 2,025.00

264,660.00 157,650.00 154,000.00 1,400.00 2,250.00

0.12 0.12 0.012 0.006

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.0154 0.2

m3 Kg

Memasang Rangka Langit-langit (1,00x1,00) m, kayu Klas II atau III Bahan Kayu Klas II (Kamfer), balok Paku Biasa 2" - 5"

0.15 0.30 0.030 0.075

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.0163 0.25

m3 Kg

Memasang Rangka Langit-langit (60x60) cm, kayu Klas II atau III Bahan Kayu Klas II (Kamfer), balok Paku Biasa 2" - 5"

0.2 0.3 0.03 0.01

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m'

0.0108 0.10

m3 Kg

Memasang Listplank Uk. (3x20)cm Kayu klas I atau II Bahan Kayu klas I (Jati), papan Paku Biasa 2" - 5"

0.1 0.2 0.020 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m'

0.011 0.05

m3 Kg

Memasang Listplank Uk. (3x30)cm Kayu klas I atau klas II Bahan Kayu klas II (Kamfer), papan Paku Biasa 2" - 5"

0.1 0.2 0.02 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.028 0.15

m3 Kg

Memasang Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III Bahan Kayu klas II (Kamfer), balok 5,000,000.00 Paku Biasa 2" - 5" 13,000.00

0.15 0.45 0.045 0.008

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.028 0.15 0.86 0.56

m3 Kg Lbr Ltr

Memasang Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II Bahan Kayu klas II (Kamfer), balok Paku Biasa 2" - 5" Teakwood 120 x 240 cm tebal 4mm Lem

0.15 0.45 0.045 0.008

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.007 0.1 0.15

m3 Kg Kg

6.24.2

6.26 6.26.1

33,000.00 43,000.00 47,000.00 45,000.00

m3 Kg

6.23.2

6.24 6.24.1

30,000.00 40,000.00 45,000.00 43,000.00

0.165 0.2

Memasang Rangka Atap Sirap, Kayu Klas II Bahan Kayu Klas II (Kamfer), balok Paku Biasa 2" - 5"

6.22.2

6.23 6.23.1

5,700,000.00 14,000.00

953,254.00 943,300.00 940,500.00 2,800.00

m2

6.21.2

6.22 6.22.1

5,000,000.00 13,000.00

836,798.00 827,600.00 825,000.00 2,600.00

1

6.20.2

6.21 6.21.1

33,000.00 43,000.00 47,000.00 45,000.00

MAKSIMUM Rp 8,295.00 3,300.00 4,300.00 470.00 225.00

30,000.00 40,000.00 45,000.00 43,000.00

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Dinding Lambriziring dari Papan klas I Bahan Kayu klas I (Jati), papan Paku Biasa 2" - 5" Paku Sekrup 3,5"

53/28

21,000,000.00 13,000.00 13,500.00

MAKSIMUM Rp

JUMLAH MINIMUM Rp 7,665.00 3,000.00 4,000.00 450.00 215.00

OH OH OH OH

6.19.2

6.20 6.20.1

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MINIMUM Rp

0.1 0.1 0.01 0.005

6.18.2

6.19 6.19.1

URAIAN PAKERJAAN

SAT.

abk 6-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.26.2

6.27 6.27.1

0.6 1.8 0.18 0.03

OH OH OH OH

1

m2

0.4 0.05

30,000.00 40,000.00 45,000.00 43,000.00

MAKSIMUM Rp

JUMLAH

33,000.00 43,000.00 47,000.00 45,000.00

MINIMUM Rp 99,390.00 18,000.00 72,000.00 8,100.00 1,290.00

MAKSIMUM Rp 107,010.00 19,800.00 77,400.00 8,460.00 1,350.00 27,171.00 22,700.00 22,000.00 700.00

Lbr Kg

51,000.00 13,000.00

55,000.00 14,000.00

25,203.00 21,050.00 20,400.00 650.00

0.025 0.075 0.0080 0.0010

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

4,153.00 750.00 3,000.00 360.00 43.00

4,471.00 825.00 3,225.00 376.00 45.00

1

m2

1.500 0.014 0.012 0.003

m2 m3 Kg m'

Memasang Dinding Bilik, Rangka Kayu Klas III atau IV Bahan Bilik Bambu Kayu Klas III (Meranti) Paku Biasa 1/2" - 1" List Kayu 2/4

15,000.00 4,200,000.00 13,000.00 4,200.00

17,500.00 4,400,000.00 14,000.00 5,000.00

86,908.60 81,468.60 22,500.00 58,800.00 156.00 12.60

93,943.00 88,033.00 26,250.00 61,600.00 168.00 15.00

0.1 0.05 0.005 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,440.00 3,000.00 2,000.00 225.00 215.00

5,910.00 3,300.00 2,150.00 235.00 225.00

6.28.2

413095359.xls

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MINIMUM Rp

Memasang Dinding Lambriziring dari Plywood ukuran (120x240) cm Bahan Plywood (120 X 240) cm x 4mm Paku Biasa 1/2" - 1"

6.27.2

6.28 6.28.1

URAIAN PAKERJAAN

SAT.

53/29

abk 6-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

SAT.

VII 03-7394 - 2008 6.1 6.1.1

1

m3

247 869 999 215

Kg Kg Kg ltr

1.65 0.275 0.028 0.083

OH OH OH OH

1

m3

276 828 1,012 215

Kg kg kg ltr

1.65 0.275 0.028 0.083 1

OH OH OH OH m3

299 799 1,017 215

Kg kg kg ltr

1.65 0.275 0.028 0.083

OH OH OH OH

1

m3

230 893 1,027 200

Kg kg kg ltr

1.2 0.2 0.02 0.006

OH OH OH OH

1

m3

326 760 1,029 215

Kg Kg Kg ltr

1.65 0.275 0.028 0.083

OH OH OH OH

1

m3

352 731 1,031 215

Kg Kg Kg ltr

1.650 0.275 0.028 0.083

OH OH OH OH

1

m3

371 698 1,047 215

Kg Kg Kg ltr

1.650 0.275 0.028 0.083

OH OH OH OH

1

m3

384 692 1,039 215

Kg Kg Kg ltr

6.1.2

6.2 6.2.1

6.2.2

6.3 6.3.1

6.3.2

6.4 6.4.1

6.4.2

6.5 6.5.1

6.5.2

6.6 6.6.1

6.6.2

6.7 6.7.1

6.7.2

6.8 6.8.1

413095359.xls

URAIAN PAKERJAAN

PEKERJAAN B E T O N Membuat Beton mutu f'c=7,4 Mpa (K100), slum (12±2)cm, w/c = 0,87 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton mutu f'c=9,8 Mpa (K125), slum (12±2)cm, w/c = 0,78 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

MINIMUM Rp

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 Bahan Portland Semen 1,050.00 Pasir Beton 100.00 Kerikil (maksimum 30 mm) 85.19 Air 3.70 Tenaga Pekerja 30,000.00 Tukang Batu 40,000.00 Kepala Tukang 45,000.00 Mandor 43,000.00 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air

53/30

MAKSIMUM Rp

1,062.50 107.14 88.89 4.25 33,000.00 43,000.00 47,000.00 45,000.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

JUMLAH MINIMUM Rp

497,474.50 432,145.50 259,350.00 86,900.00 85,100.00 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

516,584.39 445,258.39 262,437.50 93,107.14 88,800.00 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

524,931.91 459,602.91 289,800.00 82,800.00 86,207.41 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00 546,607.83 481,278.83 313,950.00 79,900.00 86,633.33 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

544,159.59 472,833.59 293,250.00 88,714.29 89,955.56 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00 565,934.39 494,608.39 317,687.50 85,607.14 90,400.00 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

464,183.19 419,025.19 241,500.00 89,300.00 87,485.19 740.00 45,158.00 36,000.00 8,000.00 900.00 258.00

481,602.46 432,192.46 244,375.00 95,678.57 91,288.89 850.00 49,410.00 39,600.00 8,600.00 940.00 270.00

572,080.06 506,751.06 342,300.00 76,000.00 87,655.56 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

591,509.99 520,183.99 346,375.00 81,428.57 91,466.67 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

596,650.43 531,321.43 369,600.00 73,100.00 87,825.93 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

616,205.62 544,879.62 374,000.00 78,321.43 91,644.44 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00 634,279.63 562,953.63 394,187.50 74,785.71 93,066.67 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00 646,738.16 575,412.16 408,000.00 74,142.86 92,355.56 913.75

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

614,663.39 549,334.39 389,550.00 69,800.00 89,188.89 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

1,062.50 107.14 88.89 4.25

627,031.91 561,702.91 403,200.00 69,200.00 88,507.41 795.50

1,050.00 100.00 85.19 3.70

MAKSIMUM Rp

abk 7-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.8.2

6.9 6.9.1

OH OH OH OH

1

m3

406 684 1,026 215

Kg kg kg ltr

1.650 0.275 0.028 0.083

OH OH OH OH

1

m3

413 681 1,021 215

Kg Kg Kg ltr

Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air

1.650 0.275 0.028 0.083

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1

m3

439 670 1,006 215

Kg Kg Kg ltr

2.1 0.35 0.035 0.105

OH OH OH OH

1

m3

448 667 1,000 215

Kg Kg Kg ltr

2.10 0.350 0.035 0.105

OH OH OH OH

10

Kg

10.50 0.150

6.10.2

6.11 6.11.1

6.11.2

6.12 6.12.1

6.12.2

6.17 6.17.1

413095359.xls

33,000.00 43,000.00 47,000.00 45,000.00

648,224.50 582,895.50 426,300.00 68,400.00 87,400.00 795.50 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

668,100.46 596,774.46 431,375.00 73,285.71 91,200.00 913.75 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

654,848.57 589,519.57 433,650.00 68,100.00 86,974.07 795.50

674,772.09 603,446.09 438,812.50 72,964.29 90,755.56 913.75

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

697,531.80 614,441.80 460,950.00 67,000.00 85,696.30 795.50 83,090.00 63,000.00 14,000.00 1,575.00 4,515.00

719,279.19 628,559.19 466,437.50 71,785.71 89,422.22 913.75 90,720.00 69,300.00 15,050.00 1,645.00 4,725.00

Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

727,986.92 637,266.92 476,000.00 71,464.29 88,888.89 913.75 90,720.00 69,300.00 15,050.00 1,645.00 4,725.00

33,000.00 43,000.00 47,000.00 45,000.00

1,062.50 107.14 88.89 4.25

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,050.00 100.00 85.19 3.70

1,062.50 107.14 88.89 4.25

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

706,170.69 623,080.69 470,400.00 66,700.00 85,185.19 795.50 83,090.00 63,000.00 14,000.00 1,575.00 4,515.00

113,079.00 107,250.00 105,000.00 2,250.00

Kg Kg

9,000.00 13,500.00

10,000.00 15,000.00

0.07 0.07 0.007 0.004

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,387.00 2,100.00 2,800.00 315.00 172.00

5,829.00 2,310.00 3,010.00 329.00 180.00

10

Kg

10.5 0.1

Kg Kg

0.05 0.05 0.005 0.003

OH OH OH OH

168,420.00 164,250.00 162,750.00 1,500.00 4,170.00 1,650.00 2,150.00 235.00 135.00

1

Kg

1.02 0.05

Kabel Presstresed Polos/strand Bahan Besi presstred polos Kawat Beton Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

14,000.00 13,500.00

15,500.00 15,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

152,204.00 148,350.00 147,000.00 1,350.00 3,854.00 1,500.00 2,000.00 225.00 129.00

18,089.00 16,050.00 15,300.00 750.00

Kg Kg

Jaring Kawat baja/Wire Mesh Bahan Jaring Kawat Baja dilas Kawat Beton

13,000.00 13,500.00

15,000.00 15,000.00

15,818.00 13,935.00 13,260.00 675.00

0.025 0.025 0.002 0.001

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,883.00 750.00 1,000.00 90.00 43.00

2,039.00 825.00 1,075.00 94.00 45.00

1

m2

0.04 0.3 0.1

m3 Kg Ltr

650,000.00 14,000.00 10,000.00

54,988.00 26,700.00 22,000.00 3,900.00 800.00

61,932.00 31,200.00 26,000.00 4,200.00 1,000.00

6.19.2

6.20 6.20.1

MAKSIMUM Rp 71,326.00 54,450.00 11,825.00 1,316.00 3,735.00

Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 Bahan Portland Semen 1,050.00 Pasir Beton 100.00 Kerikil (maksimum 30 mm) 85.19 Air 3.70 Tenaga Pekerja 30,000.00 Tukang Batu 40,000.00 Kepala Tukang 45,000.00 Mandor 43,000.00

Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 Bahan Portland Semen Pasir Beton Kerikil (maksimum 30 mm) Air Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

JUMLAH MINIMUM Rp 65,329.00 49,500.00 11,000.00 1,260.00 3,569.00

30,000.00 40,000.00 45,000.00 43,000.00

MAKSIMUM Rp

101,912.00 96,525.00 94,500.00 2,025.00

6.18.2

6.19 6.19.1

MINIMUM Rp

Pembesian dg Besi Polos atau Besi Ulir Bahan Besi Beton (polos/ulir) Kawat Beton

6.17.2

6.18 6.18.1

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

1.650 0.275 0.028 0.083

6.9.2

6.10 6.10.1

URAIAN PAKERJAAN

SAT.

Memasang Bekisting untuk Pondasi Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting

550,000.00 13,000.00 8,000.00

53/31

abk 7-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.20.2

6.21 6.21.1

OH OH OH OH

1

m2

0.045 0.3 0.1

m3 Kg Ltr

Memasang Bekisting untuk Sloof Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting

0.52 0.26 0.026 0.026

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.04 0.4 0.2 0.015 0.35 2

m3 Kg Ltr m3 Lbr Btg

Memasang Bekisting untuk Kolom Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Klas II Plywood tebal 9mm Dolken Kayu Galam diameter 8 - 10 cm / 4 m

0.66 0.33 0.033 0.033

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.04 0.4 0.2 0.018 0.35 2

m3 Kg Ltr m3 Lbr Btg

Memasang Bekisting untuk Balok Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Klas II Plywood tebal 9mm Dolken Kayu Galam diameter 8 - 10 cm / 4 m

0.66 0.33 0.033 0.033

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.04 0.4 0.2 0.015 0.35 6

m3 Kg Ltr m3 Lbr Btg

Memasang Bekisting untuk Lantai Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Klas II (Borneo) Plywood tebal 9mm Dolken Kayu Galam diameter 8 - 10 cm / 4 m

0.66 0.33 0.033 0.033

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

6.22.2

6.23 6.23.1

6.23.2

6.24 6.24.1

6.24.2

6.25 6.25.1

0.03 0.4 0.2 0.02 0.35 3 4

m3 Kg Ltr m3 Lbr Btg Buah

0.66 0.33 0.033 0.033

OH OH OH OH

1

m2

0.03 0.4 0.15 0.015 0.35 2

m3 Kg Ltr m3 Lbr Btg

6.25.2

6.26 6.26.1

413095359.xls

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

0.52 0.26 0.026 0.026

6.21.2

6.22 6.22.1

URAIAN PAKERJAAN

SAT.

MINIMUM Rp

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Memasang Bekisting untuk Tangga Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Klas II Plywood tebal 9mm Dolken Kayu Galam diameter 8 - 10 cm / 4 m

53/32

JUMLAH MINIMUM Rp

MAKSIMUM Rp

33,000.00 43,000.00 47,000.00 45,000.00

28,288.00 15,600.00 10,400.00 1,170.00 1,118.00

30,732.00 17,160.00 11,180.00 1,222.00 1,170.00

550,000.00 13,000.00 8,000.00

650,000.00 14,000.00 10,000.00

57,738.00 29,450.00 24,750.00 3,900.00 800.00

65,182.00 34,450.00 29,250.00 4,200.00 1,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

28,288.00 15,600.00 10,400.00 1,170.00 1,118.00

30,732.00 17,160.00 11,180.00 1,222.00 1,170.00

550,000.00 13,000.00 8,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 4,800,000.00 145,000.00 18,000.00

215,204.00 179,300.00 22,000.00 5,200.00 1,600.00 67,500.00 49,000.00 34,000.00

231,356.00 192,350.00 26,000.00 5,600.00 2,000.00 72,000.00 50,750.00 36,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

35,904.00 19,800.00 13,200.00 1,485.00 1,419.00

39,006.00 21,780.00 14,190.00 1,551.00 1,485.00

550,000.00 13,000.00 8,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 4,800,000.00 145,000.00 18,000.00

228,704.00 192,800.00 22,000.00 5,200.00 1,600.00 81,000.00 49,000.00 34,000.00

245,756.00 206,750.00 26,000.00 5,600.00 2,000.00 86,400.00 50,750.00 36,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

35,904.00 19,800.00 13,200.00 1,485.00 1,419.00

39,006.00 21,780.00 14,190.00 1,551.00 1,485.00

550,000.00 13,000.00 8,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 4,800,000.00 145,000.00 18,000.00

283,204.00 247,300.00 22,000.00 5,200.00 1,600.00 67,500.00 49,000.00 102,000.00

303,356.00 264,350.00 26,000.00 5,600.00 2,000.00 72,000.00 50,750.00 108,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

35,904.00 19,800.00 13,200.00 1,485.00 1,419.00

39,006.00 21,780.00 14,190.00 1,551.00 1,485.00

550,000.00 13,000.00 8,000.00 4,500,000.00 140,000.00 17,000.00 5,000.00

650,000.00 14,000.00 10,000.00 4,800,000.00 145,000.00 18,000.00 5,500.00

269,204.00 233,300.00 16,500.00 5,200.00 1,600.00 90,000.00 49,000.00 51,000.00 20,000.00

288,856.00 249,850.00 19,500.00 5,600.00 2,000.00 96,000.00 50,750.00 54,000.00 22,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

35,904.00 19,800.00 13,200.00 1,485.00 1,419.00

39,006.00 21,780.00 14,190.00 1,551.00 1,485.00

650,000.00 14,000.00 10,000.00 4,800,000.00 145,000.00 18,000.00

209,304.00 173,400.00 16,500.00 5,200.00 1,200.00 67,500.00 49,000.00 34,000.00

224,356.00 185,350.00 19,500.00 5,600.00 1,500.00 72,000.00 50,750.00 36,000.00

30,000.00 40,000.00 45,000.00 43,000.00

Memasang Bekisting untuk Dinding Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Balok Kayu Klas II Plywood tebal 9mm Dolken Kayu Galam diameter 8 - 10 cm / 4 m Formite/Penjaga jarak / Spacer (alat bantu)

MAKSIMUM Rp

550,000.00 13,000.00 8,000.00 4,500,000.00 140,000.00 17,000.00

abk 7-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

URAIAN PAKERJAAN

SAT.

MINIMUM Rp

MAKSIMUM Rp 33,000.00 43,000.00 47,000.00 45,000.00

MAKSIMUM Rp 39,006.00 21,780.00 14,190.00 1,551.00 1,485.00

550,000.00 13,000.00 17,000.00

650,000.00 14,000.00 18,000.00

37,889.00 30,820.00 14,520.00 7,800.00 8,500.00

42,255.00 34,560.00 17,160.00 8,400.00 9,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,069.00 4,500.00 2,000.00 225.00 344.00

7,695.00 4,950.00 2,150.00 235.00 360.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00

2,402,575.00 2,138,575.00 110,000.00 19,500.00 3,200.00 1,417,500.00 30,375.00 352,800.00 75,600.00 129,600.00

2,627,225.00 2,339,450.00 130,000.00 21,000.00 4,000.00 1,575,000.00 33,750.00 357,000.00 81,000.00 137,700.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

264,000.00 159,000.00 11,000.00 52,000.00 42,000.00 11,790.00 11,395.00

287,775.00 174,900.00 11,825.00 55,900.00 45,150.00 12,314.00 11,925.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00

2,966,700.00 2,667,800.00 148,500.00 26,000.00 4,800.00 1,890,000.00 40,500.00 352,800.00 75,600.00 129,600.00

3,255,755.00 2,930,200.00 175,500.00 28,000.00 6,000.00 2,100,000.00 45,000.00 357,000.00 81,000.00 137,700.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

298,900.00 169,500.00 11,000.00 62,400.00 56,000.00 14,535.00 12,169.00

325,555.00 186,450.00 11,825.00 67,080.00 60,200.00 15,181.00 12,735.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00 4,800,000.00 145,000.00 18,000.00

5,652,564.00 5,246,750.00 220,000.00 52,000.00 16,000.00 2,835,000.00 60,750.00 352,800.00 75,600.00 129,600.00 675,000.00 490,000.00 340,000.00

6,157,251.00 5,716,700.00 260,000.00 56,000.00 20,000.00 3,150,000.00 67,500.00 357,000.00 81,000.00 137,700.00 720,000.00 507,500.00 360,000.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

405,814.00 211,500.00 11,000.00 66,000.00 84,000.00 18,135.00 15,179.00

440,551.00 232,650.00 11,825.00 70,950.00 90,300.00 18,941.00 15,885.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00 4,800,000.00 145,000.00 18,000.00

4,365,059.00 4,012,900.00 176,000.00 41,600.00 12,800.00 1,890,000.00 40,500.00 352,800.00 75,600.00 129,600.00 630,000.00 392,000.00 272,000.00

4,737,986.00 4,355,500.00 208,000.00 44,800.00 16,000.00 2,100,000.00 45,000.00 357,000.00 81,000.00 137,700.00 672,000.00 406,000.00 288,000.00

6.26.2

6.27 6.27.1

0.66 0.33 0.033 0.033

OH OH OH OH

Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.0264 0.6 0.5

m3 kg m3

Memasang Jembatan Cor Bahan Kayu Terentang Paku Biasa 2" - 5" Dolken Kayu Galam diameter 8 - 10 / 4 m

0.15 0.05 0.005 0.008

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m3

0.2 1.5 0.4 157.5 2.25 336 0.54 0.81

m3 Kg Ltr Kg Kg Kg m3 m3

Membuat Pondasi Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton

5.3 0.275 1.30 1.05 0.262 0.265

OH OH OH OH OH OH

Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

1

m3

0.27 2 0.6 210 3 336 0.54 0.81

m3 Kg Ltr Kg Kg Kg m3 m3

Membuat Sloof Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton

5.65 0.275 1.56 1.4 0.323 0.283

OH OH OH OH OH OH

Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

1

m3

0.4 4 2 315 4.5 336 0.54 0.81 0.15 3.5 20

m3 Kg Ltr kg kg Kg m3 m3 m3 Lbr Btg

Membuat Kolom Beton Bertulang (300 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm

7.05 0.275 1.65 2.1 0.403 0.353

OH OH OH OH OH OH

Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

1

m3

0.32 3.2 1.6 210 3 336 0.54 0.81 0.14 2.8 16

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

6.27.2

6.28 6.28.1

6.28.2

6.29 6.29.1

6.29.2

6.30 6.30.1

6.30.2

6.31 6.31.1

413095359.xls

30,000.00 40,000.00 45,000.00 43,000.00

Membuat Balok Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm

53/33

JUMLAH MINIMUM Rp 35,904.00 19,800.00 13,200.00 1,485.00 1,419.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00 4,500,000.00 140,000.00 17,000.00

abk 7-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.31.2

6.32 6.32.1

6.35 0.275 1.65 1.4 0.333 0.318

OH OH OH OH OH OH

1

m3

0.32 3.2 1.6 157.5 2.25 336 0.54 0.81 0.12 2.8 32

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

5.3 0.275 1.3 1.05 0.265 0.265

OH OH OH OH OH OH

1

m3

0.24 3.2 1.6 157.5 2.25 336 0.54 0.81 0.16 2.8 24

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

5.3 0.275 1.3 1.05 0.262 0.265

OH OH OH OH OH OH

1

m3

0.25 3 1.2 210 3 336 0.54 0.81 0.105 2.5 14

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

5.65 0.275 1.56 1.4 0.323 0.283

OH OH OH OH OH OH

1

m'

0.002 0.01 3 0.045 4 0.006 0.009

m3 Kg Ltr Kg Kg m3 m3

0.18 0.02 0.02 0.02 0.006 0.009

OH OH OH OH OH OH

6.32.2

6.33 6.33.1

6.33.2

6.34 6.34.1

6.34.2

6.35 6.35.1

6.35.2

413095359.xls

URAIAN PAKERJAAN

SAT.

Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

MINIMUM Rp

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

Membuat Balok Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Dinding Beton Bertulang (150 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Tangga Beton Bertulang (200 kg Besi + Bekisting) Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Minyak Bekisting Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Kayu Klas II Balok Plywood 9 mm Dolken diameter 8 / 4rm Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor Membuat Kolom Penguat Beton Bertulang (11 x 11) cm Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

53/34

MAKSIMUM Rp

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00 4,800,000.00 145,000.00 18,000.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00 4,800,000.00 145,000.00 18,000.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

550,000.00 13,000.00 8,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00 4,500,000.00 140,000.00 17,000.00

650,000.00 14,000.00 10,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00 4,800,000.00 145,000.00 18,000.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

550,000.00 13,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00

650,000.00 14,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

JUMLAH MINIMUM Rp

MAKSIMUM Rp

352,159.00 190,500.00 11,000.00 66,000.00 56,000.00 14,985.00 13,674.00

382,486.00 209,550.00 11,825.00 70,950.00 60,200.00 15,651.00 14,310.00

3,999,595.00 3,712,275.00 176,000.00 41,600.00 12,800.00 1,417,500.00 30,375.00 352,800.00 75,600.00 129,600.00 540,000.00 392,000.00 544,000.00 287,320.00 159,000.00 11,000.00 52,000.00 42,000.00 11,925.00 11,395.00

4,323,405.00 4,011,250.00 208,000.00 44,800.00 16,000.00 1,575,000.00 33,750.00 357,000.00 81,000.00 137,700.00 576,000.00 406,000.00 576,000.00 312,155.00 174,900.00 11,825.00 55,900.00 45,150.00 12,455.00 11,925.00

3,999,460.00 3,712,275.00 132,000.00 41,600.00 12,800.00 1,417,500.00 30,375.00 352,800.00 75,600.00 129,600.00 720,000.00 392,000.00 408,000.00 287,185.00 159,000.00 11,000.00 52,000.00 42,000.00 11,790.00 11,395.00

4,319,264.00 4,007,250.00 156,000.00 44,800.00 16,000.00 1,575,000.00 33,750.00 357,000.00 81,000.00 137,700.00 768,000.00 406,000.00 432,000.00 312,014.00 174,900.00 11,825.00 55,900.00 45,150.00 12,314.00 11,925.00

4,060,704.00 3,735,100.00 137,500.00 39,000.00 9,600.00 1,890,000.00 40,500.00 352,800.00 75,600.00 129,600.00 472,500.00 350,000.00 238,000.00 325,604.00 169,500.00 11,000.00 62,400.00 56,000.00 14,535.00 12,169.00

4,409,171.00 4,055,700.00 162,500.00 42,000.00 12,000.00 2,100,000.00 45,000.00 357,000.00 81,000.00 137,700.00 504,000.00 362,500.00 252,000.00 353,471.00 186,450.00 11,825.00 67,080.00 60,200.00 15,181.00 12,735.00

43,774.50 35,317.50 1,100.00 130.00 27,000.00 607.50 4,200.00 840.00 1,440.00 8,457.00 5,400.00 800.00 800.00 800.00 270.00 387.00

48,002.00 38,795.00 1,300.00 140.00 30,000.00 675.00 4,250.00 900.00 1,530.00 9,207.00 5,940.00 860.00 860.00 860.00 282.00 405.00

abk 7-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.36 6.36.1

KOEF 1

m'

0.003 0.02 3.6 0.05 5.5 0.009 0.015

m3 Kg Ltr Kg Kg m3 m3

Membuat Ring Balok Beton Bertulang (10 x 15) cm Bahan Kayu Klas III (Terentang) Paku Biasa 2" - 5" Besi Beton Polos Kawat Beton Portland Semen Pasir Beton Kerikil Beton

0.297 0.033 0.033 0.033 0.01 0.015

OH OH OH OH OH OH

Tenaga Pekerja Tukang batu Tukang Kayu Tukang Besi Kepala Tukang Mandor

6.36.2

413095359.xls

URAIAN PAKERJAAN

SAT.

53/35

MINIMUM Rp

MAKSIMUM Rp

JUMLAH

550,000.00 13,000.00 9,000.00 13,500.00 1,050.00 140,000.00 160,000.00

650,000.00 14,000.00 10,000.00 15,000.00 1,062.50 150,000.00 170,000.00

MINIMUM Rp 58,385.00 44,420.00 1,650.00 260.00 32,400.00 675.00 5,775.00 1,260.00 2,400.00

30,000.00 40,000.00 40,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 43,000.00 43,000.00 47,000.00 45,000.00

13,965.00 8,910.00 1,320.00 1,320.00 1,320.00 450.00 645.00

MAKSIMUM Rp 63,926.75 48,723.75 1,950.00 280.00 36,000.00 750.00 5,843.75 1,350.00 2,550.00 15,203.00 9,801.00 1,419.00 1,419.00 1,419.00 470.00 675.00

abk 7-14

HARGA BAHAN/UPAH No.

SNI

VIII

03-3436-2002

KODE

KOEF

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN PENUTUP ATAP 6.1 6.1.1

1 25

m2 Buah

6.1.2

6.2 6.2.1

0.15 0.075 0.008 0.008

OH OH OH OH

1

m2

25

Buah

6.2.2

6.3 6.3.1

0.15 0.075 0.008 0.008

OH OH OH OH

1

m2

18

Buah

6.3.2

6.4 6.4.1

0.15 0.06 0.006 0.008

OH OH OH OH

1

m'

5 8 0.032

Buah Kg m3

0.4 0.2 0.02 0.002

OH OH OH OH

1

m'

6.4.2

6.5 6.5.1

5 8 0.032

Buah Kg m3

0.4 0.2 0.02 0.002

OH OH OH OH

1

m'

6.5.2

6.6 6.6.1

4 8 0.032

Buah Kg m3

0.4 0.2 0.02 0.002

OH OH OH OH

1

m2

0.6 0.12

0.14 0.075 0.008 0.008

6.6.2

6.9 6.9.1

6.10 6.10.1

Pasang Atap Genteng Plentong Kecil Bahan Genteng Plentong Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Genteng Kodok / Glasur Bahan Genteng Kodok / Glasur Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Genteng Plentong Super / Besar Bahan Genteng Plentong Super / Besar Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Genteng Bubung Plentong Bahan Genteng Bubung Plentong Portland Semen Pasir Pasang Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Genteng Bubung Kodok / Glasur Bahan Genteng Bubung Kodok / Glasur Portland Semen Pasir Pasang Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Genteng Bubung Plentong Besar Bahan Genteng Bubung Plentong Besar Portland Semen Pasir Pasang Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1,300.00

1,500.00

40,704.00 32,500.00 32,500.00

46,411.00 37,500.00 37,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

8,204.00 4,500.00 3,000.00 360.00 344.00

8,911.00 4,950.00 3,225.00 376.00 360.00

2,500.00

2,700.00

70,704.00 62,500.00 62,500.00

76,411.00 67,500.00 67,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

8,204.00 4,500.00 3,000.00 360.00 344.00

8,911.00 4,950.00 3,225.00 376.00 360.00

2,800.00

3,000.00

57,914.00 50,400.00 50,400.00

62,172.00 54,000.00 54,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,514.00 4,500.00 2,400.00 270.00 344.00

8,172.00 4,950.00 2,580.00 282.00 360.00

3,100.00 1,050.00 125,000.00

3,200.00 1,062.50 140,000.00

48,886.00 27,900.00 15,500.00 8,400.00 4,000.00

51,810.00 28,980.00 16,000.00 8,500.00 4,480.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,986.00 12,000.00 8,000.00 900.00 86.00

22,830.00 13,200.00 8,600.00 940.00 90.00

6,500.00 1,050.00 125,000.00

7,000.00 1,062.50 140,000.00

65,886.00 44,900.00 32,500.00 8,400.00 4,000.00

70,810.00 47,980.00 35,000.00 8,500.00 4,480.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,986.00 12,000.00 8,000.00 900.00 86.00

22,830.00 13,200.00 8,600.00 940.00 90.00 63,810.00 40,980.00 28,000.00 8,500.00 4,480.00 22,830.00 13,200.00 8,600.00 940.00 90.00

6,750.00 1,050.00 125,000.00

7,000.00 1,062.50 140,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

60,386.00 39,400.00 27,000.00 8,400.00 4,000.00 20,986.00 12,000.00 8,000.00 900.00 86.00

56,581.00 48,000.00 45,600.00 2,400.00

Lbr Kg

Pasang Atap Asbes Gelombang (2,25x0,92 m) x 5 mm Bahan Asbes Gelombang Paku Pancing 60 x 230

73,500.00 18,000.00

76,000.00 20,000.00

54,164.00 46,260.00 44,100.00 2,160.00

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,904.00 4,200.00 3,000.00 360.00 344.00

8,581.00 4,620.00 3,225.00 376.00 360.00 56,274.00 48,000.00 45,600.00 2,400.00 8,274.00 4,620.00 3,010.00 329.00 315.00

6.9.2

m2 0.6 0.12

Lbr Kg

Pasang Atap Asbes Gelombang (2,00x0,92 m) x 5 mm Bahan Asbes Gelombang Paku Pancing 60 x 230

0.14 0.07 0.007 0.007

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

6.10.2

413095359.xls

URAIAN PAKERJAAN

SAT.

53/36

73,500.00 18,000.00

76,000.00 20,000.00

53,876.00 46,260.00 44,100.00 2,160.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,616.00 4,200.00 2,800.00 315.00 301.00

abk 8-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.12 6.12.1

KOEF

Lbr Kg

Pasang Atap Asbes Gelombang (3,00x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230

73,500.00 18,000.00

75,000.00 20,000.00

0.14 0.07 0.007 0.007

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,616.00 4,200.00 2,800.00 315.00 301.00

8,274.00 4,620.00 3,010.00 329.00 315.00

1

m2

0.51 0.12

36,555.00 28,410.00 26,010.00 2,400.00

1

m2

0.35 0.12

Lbr Kg

48,000.00 18,000.00

51,000.00 20,000.00

0.14 0.067 0.007 0.007

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,496.00 4,200.00 2,680.00 315.00 301.00

8,145.00 4,620.00 2,881.00 329.00 315.00

1

m2

11 0.03

47,440.00 35,620.00 35,200.00 420.00

Lbr Kg

Pasang Atap Genteng Beton Bahan Genteng Beton Standrad Paku Biasa 2" - 5"

3,000.00 13,000.00

3,200.00 14,000.00

44,270.00 33,390.00 33,000.00 390.00

0.2 0.1 0.01 0.01

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

10,880.00 6,000.00 4,000.00 450.00 430.00

11,820.00 6,600.00 4,300.00 470.00 450.00

1

m2

60 0.2

110,563.00 92,800.00 90,000.00 2,800.00

Lbr Kg

Pasang Atap Sirap Bahan Genteng Sirap Paku Biasa 1/2" - 1"

1,400.00 13,000.00

1,500.00 14,000.00

103,049.00 86,600.00 84,000.00 2,600.00

0.166 0.25 0.025 0.008

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

16,449.00 4,980.00 10,000.00 1,125.00 344.00

17,763.00 5,478.00 10,750.00 1,175.00 360.00

1

m'

3,750.00 13,000.00 1,050.00 125,000.00 9,000.00

4,000.00 14,000.00 1,062.50 140,000.00 10,000.00

29,115.00 29,115.00 13,125.00 650.00 11,340.00 4,000.00 9,000.00

30,655.00 30,655.00 14,000.00 700.00 11,475.00 4,480.00 10,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

21,760.00 12,000.00 8,000.00 900.00 860.00

23,640.00 13,200.00 8,600.00 940.00 900.00

33,000.00 13,000.00 13,000.00 5,800,000.00

35,000.00 14,000.00 14,000.00 6,200,000.00

58,813.00 43,680.00 13,200.00 780.00 6,500.00 23,200.00

62,960.00 46,640.00 14,000.00 840.00 7,000.00 24,800.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

15,133.00 3,750.00 10,000.00 1,125.00 258.00

16,320.00 4,125.00 10,750.00 1,175.00 270.00

52,288.00 45,760.00 45,500.00 260.00 6,528.00 3,600.00 2,400.00 270.00 258.00

54,272.00 47,180.00 46,900.00 280.00 7,092.00 3,960.00 2,580.00 282.00 270.00

27,938.00 20,020.00 19,500.00 520.00 7,918.00 4,500.00 2,800.00 360.00 258.00

29,266.00 20,660.00 20,100.00 560.00 8,606.00 4,950.00 3,010.00 376.00 270.00

6.33.2

6.34 6.34.1

Buah Kg Kg m3 Kg

0.4 0.2 0.02 0.02

OH OH OH OH

1

m'

0.4 0.06 0.5 0.004

Lbr Kg Kg m3

Pasang Nok Sirap Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Paku Biasa 2" - 5" Kayu Kamfer Papan Tebal 3 cm

0.125 0.25 0.025 0.006

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m2

0.7 0.02

Lbr Kg

0.12 0.06 0.006 0.006

OH OH OH OH

1

m'

0.3 0.04

Lbr Kg

0.15 0.07 0.008 0.006

OH OH OH OH

6.37.2

6.38 6.38.1

6.38.2

6.39 6.39.1

6.39.2

413095359.xls

Pasang Nok Genteng Beton Bahan Nok Genteng Beton Paku Biasa 2" - 5" Portland Semen Pasir Pasang Semen Warna

3.5 0.05 10.8 0.032 1 6.34.2

6.37 6.37.1

MAKSIMUM Rp 36,924.00 28,650.00 26,250.00 2,400.00

34,136.00 26,640.00 24,480.00 2,160.00

6.30.2

6.33 6.33.1

MAKSIMUM Rp

Pasang Atap Asbes Gelombang (2,10x1,05 m) x 4 mm Bahan Asbes Gelombang Paku Pancing 60 x 230

6.15.2

6.30 6.30.1

MINIMUM Rp

JUMLAH MINIMUM Rp 35,501.00 27,885.00 25,725.00 2,160.00

6.12.2

6.15 6.15.1

URAIAN PAKERJAAN

SAT.

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

Pasang Atap Seng Gelombang Bahan Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Atap Nok Seng Bahan Seng Plaat 3" x 6" BJLS 28 Paku Biasa 1/2" - 1" Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

53/37

65,000.00 13,000.00

67,000.00 14,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

65,000.00 13,000.00

67,000.00 14,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

abk 8-14

HARGA BAHAN/UPAH No.

SNI

KODE

6.42 6.42.1

KOEF

SAT.

1

m2

1.05

m2

0.15 0.05 0.005 0.008

OH OH OH OH

6.42.2

413095359.xls

URAIAN PAKERJAAN

Pasang Allumunium Foil / Sisalation Bahan Sisalation / Allumunium Foil Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

53/38

MINIMUM Rp

MAKSIMUM Rp

6,500.00

6,700.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

JUMLAH MINIMUM Rp 13,894.00 6,825.00 6,825.00 7,069.00 4,500.00 2,000.00 225.00 344.00

MAKSIMUM Rp 14,730.00 7,035.00 7,035.00 7,695.00 4,950.00 2,150.00 235.00 360.00

abk 8-14

HARGA BAHAN/UPAH No.

SNI

IX

03-2839 - 2008

KODE

KOEF

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN LANGIT - LANGIT 6.1 6.1.1

1

m2 Lbr Kg

Memasang Langit-langit Asbes (1,00x1,00) m, tebal 4 mm, 5 mm & 6 mm Bahan Plat Asbes Paku

1.1 0.01

12,000.00 13,000.00

0.03 0.07 0.007 0.004

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

1

m2

12.0 0.05

6.1.2

6.2 6.2.1

6.3 6.3.1

67,654.00 57,700.00 57,000.00 700.00

0.12 0.12 0.012 0.006

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

9,198.00 3,600.00 4,800.00 540.00 258.00

9,954.00 3,960.00 5,160.00 564.00 270.00

1

m2

5.80 0.05

78,595.00 70,300.00 69,600.00 700.00

Lbr Kg

Memasang Langit-langit Akustik Ukuran (30x60) cm Bahan Akustik Paku

11,000.00 13,000.00

12,000.00 14,000.00

72,115.00 64,450.00 63,800.00 650.00

0.10 0.10 0.01 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,665.00 3,000.00 4,000.00 450.00 215.00

8,295.00 3,300.00 4,300.00 470.00 225.00

1

m2

0.375 0.03

Lbr Kg

Memasang Langit-langit Tripleks Uk (120x240) cm, Tebal 3 mm, 4 mm & 6 mm Bahan Tripleks (4 mm) 51,000.00 Paku Tripleks 13,000.00

55,000.00 14,000.00

27,180.00 19,515.00 19,125.00 390.00

29,340.00 21,045.00 20,625.00 420.00

0.10 0.10 0.01 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

33,000.00 43,000.00 47,000.00 45,000.00

7,665.00 3,000.00 4,000.00 450.00 215.00

8,295.00 3,300.00 4,300.00 470.00 225.00

1

m2

0.015 0.01

m3 Kg

Memasang Langit-langit Lambriziring Kayu Jati, tebal 6 mm Bahan Kayu Jati,Papan Paku

21,000,000.00 13,000.00

22,000,000.00 14,000.00

376,450.00 315,130.00 315,000.00 130.00

396,500.00 330,140.00 330,000.00 140.00

0.8 0.8 0.08 0.04

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

61,320.00 24,000.00 32,000.00 3,600.00 1,720.00

66,360.00 26,400.00 34,400.00 3,760.00 1,800.00

1

m2

0.364 0.11

29,036.00 23,126.00 21,476.00 1,650.00

30,000.00 40,000.00 45,000.00 43,000.00

Lbr Kg

Memasng Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm Bahan Gypsum Board Paku Sekrup

55,000.00 13,500.00

59,000.00 15,000.00

26,945.00 21,505.00 20,020.00 1,485.00

0.1 0.05 0.005 0.005

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,440.00 3,000.00 2,000.00 225.00 215.00

5,910.00 3,300.00 2,150.00 235.00 225.00

1

m2

3.6 0.15 1.05 1.5

137,025.00 95,550.00 14,400.00 1,050.00 23,100.00 57,000.00

m' kg bh lmb

Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumunium Bahan Profil Allumunium "T" Kawat Ø 4 mm Ramset Akuatik 60 x 120 cm

3,500.00 6,500.00 21,500.00 37,000.00

4,000.00 7,000.00 22,000.00 38,000.00

129,975.00 91,650.00 12,600.00 975.00 22,575.00 55,500.00

0.5 0.5 0.05 0.025

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,325.00 15,000.00 20,000.00 2,250.00 1,075.00

41,475.00 16,500.00 21,500.00 2,350.00 1,125.00

1

m1

1.05 0.01

9,560.00 5,390.00 5,250.00 140.00

0.05 0.05 0.005 0.003

4,170.00 1,650.00 2,150.00 235.00 135.00

6.9.2

6.10 6.10.1

4,509.00 990.00 3,010.00 329.00 180.00

4,750.00 14,000.00

6.7.2

6.9 6.9.1

4,187.00 900.00 2,800.00 315.00 172.00

4,700.00 13,000.00

6.6.2

6.7 6.7.1

33,000.00 43,000.00 47,000.00 45,000.00

Lbr Kg

6.5.2

6.6 6.6.1

18,949.00 14,440.00 14,300.00 140.00

66,248.00 57,050.00 56,400.00 650.00

6.3.2

6.5 6.5.1

13,000.00 14,000.00

17,517.00 13,330.00 13,200.00 130.00

Memasang Langit-langit Akustik Ukuran (30x30) cm Bahan Akustik Uk.30 x 30 cm Paku

6.2.2

m1 Kg

List Langit-Langit Kayu Profil Bahan List Kayu Profil Paku

4,200.00 13,000.00

5,000.00 14,000.00

8,394.00 4,540.00 4,410.00 130.00

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

3,854.00 1,500.00 2,000.00 225.00 129.00

6.10.2

413095359.xls

URAIAN PAKERJAAN

SAT.

53/39

abk 9-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

X 6.1

1 Unit

6.1.1

1 Buah 0.06 6.1.2

3.3 1.1 0.001 0.16 6.2 6.2.1

OH OH OH OH

1 Unit 1 6 0.01

Buah Kg m3

1 1.5 1.5 0.16

OH OH OH OH

6.2.2

6.4

1 Unit

6.4.1

1 0.3 6 0.01

Buah Kg m3

1 1 0.1 0.1

OH OH OH OH

6.4.1

6.5 6.5.1

1 Unit 1 0.3 6 0.01

Buah Kg m3

1.2 0.145 0.15 0.1

OH OH OH OH

6.5.2

6.8 6.8.1

1 Unit 0.4 120 0.3 360 6

m3 Kg m3 buah Kg

6 3 0.3 0.3

OH OH OH OH

1

m'

6.8.2

6.14 6.14.1

1.1 0.027 0.68 0.056 0.024

Buah m3 Kg m3 m3

0.14 0.07 0.007 0.007

OH OH OH OH

1

m'

6.14.2

6.15 6.15.1

1.1 0.55 10.3 0.061 0.069

Buah m3 Kg m3 m3

0.38 0.19 0.019 0.019

OH OH OH OH

6.15.2

413095359.xls53/40

URAIAN PAKERJAAN

SAT.

PEKERJAAN SANITASI Memasang Closet Duduk / Mono Blok Bahan Kloset Duduk / Monoblok Kelengkapan 6% dari harga Kloset Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Closet Jongkok Porselen Bahan Kloset Jongkok Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Urinoir Bahan Urinoir Perlengkapan 30% Harga Urinoir Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Wastafel Bahan Wastafel Meja Oval Perlengkapan 30% Harga Wastafel Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Bahan Batu Bata Portland Semen Pasir Pasang Porselen 11 x 11 cm Semen Nat Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Pipa Beton, Ø 15 cm - 20 cm Bahan Pipa Beton Batu Bata Portland Semen Pasir Pasang Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Pipa Beton, Ø 30 cm - 100 cm Bahan Pipa Beton Batu Bata Portland Semen Pasir Pasang Pasir Urug Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

900,000.00 900,000.00

1,100,000.00 1,100,000.00

1,103,925.00 954,000.00 900,000.00 54,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

149,925.00 99,000.00 44,000.00 45.00 6,880.00

163,447.00 108,900.00 47,300.00 47.00 7,200.00

80,000.00 1,050.00 125,000.00

105,000.00 1,062.50 140,000.00

251,930.00 87,550.00 80,000.00 6,300.00 1,250.00

287,975.00 112,775.00 105,000.00 6,375.00 1,400.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

164,380.00 30,000.00 60,000.00 67,500.00 6,880.00

175,200.00 33,000.00 64,500.00 70,500.00 7,200.00

275,000.00 275,000.00 1,050.00 125,000.00

300,000.00 300,000.00 1,062.50 140,000.00

443,850.00 365,050.00 275,000.00 82,500.00 6,300.00 1,250.00

482,975.00 397,775.00 300,000.00 90,000.00 6,375.00 1,400.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

78,800.00 30,000.00 40,000.00 4,500.00 4,300.00

85,200.00 33,000.00 43,000.00 4,700.00 4,500.00

700,000.00 700,000.00 1,050.00 125,000.00

750,000.00 750,000.00 1,062.50 140,000.00

970,400.00 917,550.00 700,000.00 210,000.00 6,300.00 1,250.00

1,040,160.00 982,775.00 750,000.00 225,000.00 6,375.00 1,400.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

52,850.00 36,000.00 5,800.00 6,750.00 4,300.00

57,385.00 39,600.00 6,235.00 7,050.00 4,500.00

300,000.00 1,050.00 125,000.00 277.78 9,000.00

337,500.00 1,062.50 140,000.00 303.03 10,000.00

763,900.00 437,500.00 120,000.00 126,000.00 37,500.00 100,000.00 54,000.00

828,190.91 473,590.91 135,000.00 127,500.00 42,000.00 109,090.91 60,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

326,400.00 180,000.00 120,000.00 13,500.00 12,900.00

354,600.00 198,000.00 129,000.00 14,100.00 13,500.00

20,000.00 300,000.00 1,050.00 125,000.00 75,000.00

25,000.00 337,500.00 1,062.50 140,000.00 85,000.00

47,230.00 39,614.00 22,000.00 8,100.00 714.00 7,000.00 1,800.00

55,489.00 47,215.00 27,500.00 9,112.50 722.50 7,840.00 2,040.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,616.00 4,200.00 2,800.00 315.00 301.00

8,274.00 4,620.00 3,010.00 329.00 315.00

242,287.00 221,615.00 33,000.00 165,000.00 10,815.00 7,625.00 5,175.00 20,672.00 11,400.00 7,600.00 855.00 817.00

268,631.75 246,173.75 35,200.00 185,625.00 10,943.75 8,540.00 5,865.00 22,458.00 12,540.00 8,170.00 893.00 855.00

30,000.00 300,000.00 1,050.00 125,000.00 75,000.00

32,000.00 337,500.00 1,062.50 140,000.00 85,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

1,329,447.00 1,166,000.00 1,100,000.00 66,000.00

abk 10-14

HARGA BAHAN/UPAH No.

SNI

KODE

6.20 6.20.1

KOEF

1 m' 1.2 0.35

m'

0.054 0.09 0.009 0.027

OH OH OH OH

6.20.2

6.23 6.23.1

1 m' 1.2 0.35

m'

0.108 0.18 0.018 0.0054

OH OH OH OH

6.23.2

6.24

1 m'

6.24.1

1.2 0.35

m'

0.135 0.225 0.0225 0.0068

OH OH OH OH

6.24.2

6.25 6.25.1

1 m' 1.2 0.35

m'

0.036 0.06 0.006 0.0018

OH OH OH OH

6.25.2

6.29

1 m'

6.29.1

1.2 0.35

m'

0.054 0.09 0.009 0.0027

OH OH OH OH

6.29.2

6.31

1 m'

6.31.1

1.2 0.35

m'

0.081 0.135 0.014 0.0041

OH OH OH OH

6.31.2

6.33 6.33.1

1 Buah 1 1

Buah Set

6.33.2

0.03 0.3 0.03 0.0015 6.35

OH OH OH OH

1 Buah

6.35.1

1 0.025

Buah Set

0.01 0.1 0.01 0.005

OH OH OH OH

6.35.2

413095359.xls53/41

URAIAN PAKERJAAN

SAT.

Memasang Pipa Galvanis Ø ¾" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

18,666.67 18,666.67

19,500.00 19,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

35,719.33 28,933.33 22,400.00 6,533.33 6,786.00 1,620.00 3,600.00 405.00 1,161.00

37,515.00 30,225.00 23,400.00 6,825.00 7,290.00 1,782.00 3,870.00 423.00 1,215.00 136,393.00 124,000.00 96,000.00 28,000.00

Memasang Pipa Galvanis Ø 3" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa

78,333.33 78,333.33

80,000.00 80,000.00

132,898.87 121,416.67 94,000.00 27,416.67

Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

11,482.20 3,240.00 7,200.00 810.00 232.20

12,393.00 3,564.00 7,740.00 846.00 243.00 169,201.83 153,708.33 119,000.00 34,708.33

Memasang Pipa Galvanis Ø 4" Bahan Pipa Galvanis Perlengkapan 35% Harga Pipa

97,500.00 97,500.00

99,166.67 99,166.67

165,479.90 151,125.00 117,000.00 34,125.00

Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,354.90 4,050.00 9,000.00 1,012.50 292.40

15,493.50 4,455.00 9,675.00 1,057.50 306.00

4,750.00 4,750.00

5,000.00 5,000.00

11,189.90 7,362.50 5,700.00 1,662.50

11,881.00 7,750.00 6,000.00 1,750.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

3,827.40 1,080.00 2,400.00 270.00 77.40

4,131.00 1,188.00 2,580.00 282.00 81.00

9,500.00 9,500.00

12,833.33 12,833.33

20,466.10 14,725.00 11,400.00 3,325.00

26,088.17 19,891.67 15,400.00 4,491.67

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,741.10 1,620.00 3,600.00 405.00 116.10

6,196.50 1,782.00 3,870.00 423.00 121.50 45,242.92 35,972.92 27,850.00 8,122.92 9,270.00 2,673.00 5,805.00 607.50 184.50

Memasang Pipa PVC type AW Ø ½" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Pipa PVC type AW Ø 2" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Pipa PVC type AW Ø 3" Bahan Pipa PVC Perlengkapan 35% Harga Pipa Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Bak Cuci Piring Stainles Steel Bahan Bak Cuci Stainles Steel Water Drain & assesories Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor Memasang Kran Ø ¾" atau ½" Bahan Kran Air Seal Tape Tenaga Pekerja Tukang Ledeng Kepala Tukang Mandor

20,416.67 20,416.67

23,208.33 23,208.33

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 45,000.00 45,000.00

40,259.63 31,645.83 24,500.00 7,145.83 8,613.80 2,430.00 5,400.00 607.50 176.30

145,000.00 145,000.00

160,000.00 160,000.00

304,314.50 290,000.00 145,000.00 145,000.00

335,367.50 320,000.00 160,000.00 160,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,314.50 900.00 12,000.00 1,350.00 64.50

15,367.50 990.00 12,900.00 1,410.00 67.50

7,500.00 2,000.00

15,000.00 2,200.00

12,515.00 7,550.00 7,500.00 50.00

20,360.00 15,055.00 15,000.00 55.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 45,000.00 45,000.00

4,965.00 300.00 4,000.00 450.00 215.00

5,305.00 330.00 4,300.00 450.00 225.00

abk 10-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.36

KOEF

1 Buah

6.36.1

1

Buah

6.36.2

0.01 0.1 0.01 0.005

413095359.xls53/42

URAIAN PAKERJAAN

SAT.

OH OH OH OH

Memasang Floor Drain Bahan Floor Drain Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

MINIMUM Rp

MAKSIMUM Rp

JUMLAH

3,750.00

4,000.00

MINIMUM Rp 8,715.00 3,750.00 3,750.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

4,965.00 300.00 4,000.00 450.00 215.00

MAKSIMUM Rp 9,325.00 4,000.00 4,000.00 5,325.00 330.00 4,300.00 470.00 225.00

abk 10-14

HARGA BAHAN/UPAH No.

SNI

XI

03-7393 - 2008

KODE

6.1

KOEF

Kg Kg

13,000.00 13,000.00

0.06 0.06 0.006 0.003

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

1

kg

1.15

Kg

1.15 0.06 6.1.2

4,599.00 1,800.00 2,400.00 270.00 129.00

4,977.00 1,980.00 2,580.00 282.00 135.00 20,502.00 15,525.00 15,525.00

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

4,599.00 1,800.00 2,400.00 270.00 129.00

4,977.00 1,980.00 2,580.00 282.00 135.00

100

kg

1 0.1

ltr ltr

21,970.00 14,150.00 11,250.00 2,900.00 7,820.00 3,000.00 4,000.00 45.00 215.00

22,662.00 14,150.00 11,250.00 2,900.00 8,512.00 3,300.00 4,300.00 47.00 225.00

0.100 0.100 0.001 0.005

OH OH OH OH

Mengerjakan Pekerjaan Perakitan (Kuda-kuda Baja) Bahan Solar Minyak Pelumas Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

0.008

Jam

Sewa Alat

1

m2

Membuat Pintu Besi Plat Baja tebal 2 mm rangkap, rangka baja Siku

15

Kg

Besi Siku L.30.30.3

13,000.00

13,500.00

32.8

Kg

Besi Plat Baja

11,000.00

0.05

Kg

Kawat Las

1.05

OH

1.05

11,250.00 29,000.00

11,250.00 29,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

70,000.00

80,000.00

560.00

640.00

638,861.00

685,925.00

558,400.00

598,850.00

195,000.00

202,500.00

12,000.00

360,800.00

393,600.00

52,000.00

55,000.00

2,600.00

2,750.00

80,461.00

87,075.00

Pekerja

30,000.00

33,000.00

31,500.00

34,650.00

OH

Tukang Besi

40,000.00

43,000.00

42,000.00

45,150.00

0.105

OH

Kepala Tukang

45,000.00

47,000.00

4,725.00

4,935.00

0.052

OH

Mandor

43,000.00

45,000.00

2,236.00

2,340.00

10

cm

Mengerjakan Pengelasan dengan Las Listrik

16,609.50

18,617.50

2,533.50

2,653.50

Bahan

Tenaga

Bahan 0.04

kg

Kawat Las

52,000.00

55,000.00

2,080.00

2,200.00

0.03

ltr

Solar

11,250.00

11,250.00

337.50

337.50

0.004

ltr

Minyak Pelumas

29,000.00

29,000.00

116.00

116.00

14,076.00

15,964.00

0.04

OH

Pekerja

30,000.00

33,000.00

1,200.00

1,320.00

0.02

OH

Tukang Besi

40,000.00

43,000.00

800.00

860.00

0.002

OH

Kepala Tukang

45,000.00

47,000.00

90.00

94.00

0.002

OH

Mandor

43,000.00

45,000.00

86.00

90.00

0.17

Jam

Sewa Alat

70,000

80,000

11,900.00

13,600.00

1

m2

Memasang Pintu Rolling Door Besi

314,658.00

327,110.00

Bahan

225,000.00

230,000.00

225,000.00

230,000.00

6.5.2

Tenaga

1

m2

1.2

OH

6.7.2

Pintu Gulung Besi

225,000.00

230,000.00

89,658.00

97,110.00

Pekerja

30,000.00

33,000.00

36,000.00

39,600.00

Tenaga 1.2

OH

Tukang Besi

40,000.00

43,000.00

48,000.00

51,600.00

0.12

OH

Kepala Tukang

45,000.00

47,000.00

5,400.00

5,640.00

0.006

OH

Mandor

43,000.00

45,000.00

258.00

270.00

1

m2

Memasang Pintu Lipat (Folding Door)

383,726.00

416,498.00

Bahan

350,000.00

380,000.00

350,000.00

380,000.00

6.8.1 1

m2

350,000.00

380,000.00

0.44

OH

33,726.00

36,498.00

Pekerja

30,000.00

33,000.00

13,200.00

0.44

14,520.00

OH

Tukang Besi

40,000.00

43,000.00

17,600.00

18,920.00

0.044

OH

Kepala Tukang

45,000.00

47,000.00

1,980.00

2,068.00

0.022

OH

Mandor

43,000.00

45,000.00

946.00

990.00

6.8.2

413095359.xls

33,000.00 43,000.00 47,000.00 45,000.00

0.06 0.06 0.006 0.003

6.5.1

6.8

21,582.00 16,605.00 15,525.00 1,080.00

13,500.00

6.4.2

6.7.1

13,500.00 18,000.00

20,329.00 15,730.00 14,950.00 780.00

13,000.00

6.4.1

6.7

MAKSIMUM Rp

kg

6.3.2

6.5

JUMLAH MINIMUM Rp

19,549.00 14,950.00 14,950.00

6.3.1

6.4

MAKSIMUM Rp

Memasang Rangka Kuda-kuda Baja IWF Bahan Besi Baja IWF

6.2.2

6.3

MINIMUM Rp

PEKERJAAN BESI & ALLUMUNIUM Memasang Besi Profil Bahan Besi Profil Meni Besi

1

6.1.1

6.2 6.2.1

URAIAN PAKERJAAN

SAT.

Pintu Lipat Tenaga

53/43

abk 11-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.9

KOEF 1

m2

6.9.1 1

m2

0.08

OH

0.8

280,000.00

38,172.00

40,980.00

2,400.00

2,640.00

OH

Tukang Besi

40,000.00

43,000.00

32,000.00

34,400.00

Sunscreen Allumunium

0.08

OH

Kepala Tukang

45,000.00

47,000.00

3,600.00

3,760.00

OH

Mandor

43,000.00

45,000.00

172.00

180.00

1

m2

Memasang Rolling Door Allumunium

286,650.00

297,950.00

Bahan

210,000.00

215,000.00

210,000.00

215,000.00

1

m2

210,000.00

215,000.00

1

OH

1

Rolling Allumunium

76,650.00

82,950.00

Pekerja

30,000.00

33,000.00

30,000.00

33,000.00

OH

Tukang Besi

40,000.00

43,000.00

40,000.00

43,000.00

0.1

OH

Kepala Tukang

45,000.00

47,000.00

4,500.00

4,700.00

0.05

OH

Mandor

43,000.00

45,000.00

2,150.00

2,250.00

1

m'

Memasang Kusen Pintu Allumunium

82,593.80

85,764.60

Bahan

79,300.00

82,200.00

Tenaga

m'

Profil Allumunium

68,000.00

70,000.00

74,800.00

77,000.00

750.00

800.00

1,500.00

1,600.00

50,000.00

60,000.00

3,000.00

3,600.00

2

buah

Skrup Fixer

0.06

Tube

Sealant

3,293.80

3,564.60

0.043

OH

Pekerja

30,000.00

33,000.00

1,290.00

1,419.00

0.043

OH

Tukang Besi

40,000.00

43,000.00

1,720.00

1,849.00

0.0043

OH

Kepala Tukang

45,000.00

47,000.00

193.50

202.10

0.0021

OH

Mandor

43,000.00

45,000.00

90.30

94.50

1

m2

Memasang Pintu Allumunium Strip Lebar 8 cm

743,713.10

826,048.50

Bahan

737,200.00

819,000.00

Tenaga

4.4

m'

Profil Allumunium

68,000.00

70,000.00

299,200.00

308,000.00

14.6

m'

Allumunium Strip

30,000.00

35,000.00

438,000.00

511,000.00

0.085 0.085 0.0085 0.0042

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,513.10 2,550.00 3,400.00 382.50 180.60

7,048.50 2,805.00 3,655.00 399.50 189.00

1

m2

4.4 4.5 0.27

222,308.00 215,200.00 154,000.00 45,000.00 16,200.00

6.12.2

m' m' tube

Memasang Pintu Kaca Rangka Allumunium Bahan Pintu Allumunium Profil Kaca Sealant

30,000.00 9,000.00 50,000.00

35,000.00 10,000.00 60,000.00

192,570.00 186,000.00 132,000.00 40,500.00 13,500.00

0.085 0.085 0.009 0.005

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,570.00 2,550.00 3,400.00 405.00 215.00

7,108.00 2,805.00 3,655.00 423.00 225.00

1

m2

1

129,055.00 100,000.00 100,000.00

6.13.2

m2

Memasang Venetions Blinds & Vertical Blinds Bahan Venetions Blinds atau Vertical Blinds (tirai)

95,000.00

100,000.00

121,849.00 95,000.00 95,000.00

0.35 0.35 0.035 0.018

OH OH OH OH

Tenaga Pekerja Tukang Besi Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

26,849.00 10,500.00 14,000.00 1,575.00 774.00

29,055.00 11,550.00 15,050.00 1,645.00 810.00

1

m2

6.177 27.08

212,628.00 74,124.00 74,124.00 504,161.90

6.14.2

m' cm

Memasang Terali Besi Strip (2x3) cm Bahan Besi Strip 2x3 Pengelasan

11,000.00 16,609.50

12,000.00 18,617.50

195,931.00 67,947.00 67,947.00 449,785.26

1.67 1.67 0.167 0.083

OH OH OH OH

Tenaga Pekerja Tukang Las Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

127,984.00 50,100.00 66,800.00 7,515.00 3,569.00

138,504.00 55,110.00 71,810.00 7,849.00 3,735.00

1

m2

1.1 11.11 1.716

m2 cm kg

10,000.00 18,617.50 12,000.00

220,972.55 213,307.55 9,900.00 184,531.55 18,876.00

246,727.43 238,432.43 11,000.00 206,840.43 20,592.00

6.15.2

413095359.xls

280,000.00

265,000.00

33,000.00

6.12.1

6.16 6.16.1

320,980.00

265,000.00

30,000.00

6.11.2

6.15 6.15.1

303,172.00

Bahan

0.004

1.1

6.14 6.14.1

MAKSIMUM Rp

Pekerja

6.11.1

6.13 6.13.1

JUMLAH MINIMUM Rp

Sunscreen Allumunium

Tenaga

6.10.2

6.12

MAKSIMUM Rp

280,000.00

6.10.1

6.11

MINIMUM Rp

265,000.00

6.9.2

6.10

URAIAN PAKERJAAN

SAT.

Memasang Kawat Nyamuk Bahan Kawat Nyamuk nylon Pengelasan Baja Strip (0,2x2) cm

9,000.00 16,609.50 11,000.00

53/44

abk 11-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.16.2

6.17 6.17.1

0.1 0.1 0.01 0.0050

OH OH OH OH

1

m2

1.1 10 7

m2 buah m'

6.17.2

6.18 6.18.1

Memasang Jendela Nako & Tralis Bahan Jendela Nako Paku Skrup 1 - 2,5 cm Besi Strip Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

JUMLAH MINIMUM Rp

MAKSIMUM Rp

7,665.00 3,000.00 4,000.00 450.00 215.00

8,295.00 3,300.00 4,300.00 470.00 225.00

7,000.00 50.00 450.00

7,500.00 60.00 500.00

26,293.00 11,350.00 7,700.00 500.00 3,150.00

28,535.00 12,350.00 8,250.00 600.00 3,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,943.00 6,000.00 8,000.00 900.00 43.00

16,185.00 6,600.00 8,600.00 940.00 45.00

33,000.00 13,000.00 4,200,000.00

35,000.00 14,000.00 4,400,000.00

138,200.00 114,645.00 34,650.00 195.00 79,800.00

145,985.00 120,560.00 36,750.00 210.00 83,600.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

23,555.00 6,000.00 16,000.00 1,125.00 430.00

25,425.00 6,600.00 17,200.00 1,175.00 450.00

40,000.00 14,000.00 12,000.00

63,724.00 45,530.00 39,900.00 130.00 5,500.00

67,760.00 48,140.00 42,000.00 140.00 6,000.00

33,000.00 43,000.00 47,000.00 45,000.00

18,194.00 4,500.00 12,000.00 1,350.00 344.00

19,620.00 4,950.00 12,900.00 1,410.00 360.00

1

m'

1.05 0.015 0.019

Lbr Kg m3

Memasang Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm Bahan Seng Plaat Paku Biasa 1 - 2,5 cm Kayu Papan Klas II atau III

0.20 0.4 0.025 0.01

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

1

m'

1.05 0.01 0.5

Lbr Kg Kg

Memasang Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm Bahan Seng Plaat 38,000.00 Paku Biasa 1 - 2,5 cm 13,000.00 Besi strip 11,000.00

0.15 0.3 0.03 0.008

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

53/45

MAKSIMUM Rp

33,000.00 43,000.00 47,000.00 45,000.00

30,000.00 40,000.00 45,000.00 43,000.00

OH OH OH OH

6.19.2

413095359.xls

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MINIMUM Rp

0.2 0.2 0.02 0.001

6.18.2

6.19 6.19.1

URAIAN PAKERJAAN

SAT.

abk 11-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

URAIAN PAKERJAAN

SAT.

XII

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN KUNCI dan KACA 6.2 6.2..1

1 Buah 1

Buah

6.2.2 0.01 0.5 0.01 0.005 6.3 6.3.1

OH OH OH OH

1 Buah 1 Buah

6.3..2 0.005 0.5 0.005 0.0025 6.4 6.4.1

OH OH OH OH

1 Buah 1 Buah

6.4.2 0.005 0.5 0.005 0.0025 6.5 6.5.1

OH OH OH OH

1 Buah 1 Buah

6.5.2 0.015 0.15 0.015 0.0075 6.6 6..6.1

OH OH OH OH

1

Buah

1

Buah

6.6.2

0.01 0.1 0.01 0.005 6.7 6.7.1

OH OH OH OH

1

Buah

1

Buah

6.7.2

0.02 0.2 0.02 0.01 6.9 6.9.1

OH OH OH OH

1

Buah

1

Buah

6.9.2

0.015 0.15 0.015 0.00075 6.10 6.10.1

OH OH OH OH

1

Buah

1

Buah

6.10.2

0.05 0.5 0.05 0.0025 6.11

OH OH OH OH

1

Buah

1

Buah

6.11.1 6.11.2

0.02 0.2 0.02 0.001

413095359.xls

OH OH OH OH

Memasang Kunci Tanam Biasa Bahan Kunci Tanam Biasa Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

125,000.00

135,000.00

145,965.00 125,000.00 125,000.00

157,525.00 135,000.00 135,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,965.00 300.00 20,000.00 450.00 215.00

22,525.00 330.00 21,500.00 470.00 225.00 72,012.50 50,000.00 50,000.00

Memasang Kunci Kamar Mandi Bahan Kunci Tanam Kamar Mandi

45,000.00

50,000.00

65,482.50 45,000.00 45,000.00

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,482.50 150.00 20,000.00 225.00 107.50

22,012.50 165.00 21,500.00 235.00 112.50

125,000.00

135,000.00

145,482.50 125,000.00 125,000.00

157,012.50 135,000.00 135,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

20,482.50 150.00 20,000.00 225.00 107.50

22,012.50 165.00 21,500.00 235.00 112.50

5,000.00

9,000.00

12,447.50 5,000.00 5,000.00

16,987.50 9,000.00 9,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,447.50 450.00 6,000.00 675.00 322.50

7,987.50 495.00 6,450.00 705.00 337.50

2,250.00

2,500.00

7,215.00 2,250.00 2,250.00

7,825.00 2,500.00 2,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

4,965.00 300.00 4,000.00 450.00 215.00

5,325.00 330.00 4,300.00 470.00 225.00 26,650.00 16,000.00 16,000.00

Memasang Kunci Selinder Bahan Kunci Selinder Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Memasang Engsel Pintu Bahan Engsel pintu Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Engsel Jendela Kupu-kupu Bahan Engsel Jendela Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Engsel Angin Bahan Engsel Angin

15,000.00

16,000.00

24,930.00 15,000.00 15,000.00

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

9,930.00 600.00 8,000.00 900.00 430.00

10,650.00 660.00 8,600.00 940.00 450.00

5,000.00

15,000.00

12,157.25 5,000.00 5,000.00

22,683.75 15,000.00 15,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,157.25 450.00 6,000.00 675.00 32.25

7,683.75 495.00 6,450.00 705.00 33.75 40,612.50 15,000.00 15,000.00

Pasang Kait Angin Bahan Kait Angin Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Door Closer Bahan Door Closer

10,000.00

15,000.00

33,857.50 10,000.00 10,000.00

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

23,857.50 1,500.00 20,000.00 2,250.00 107.50

25,612.50 1,650.00 21,500.00 2,350.00 112.50

17,043.00 7,500.00 7,500.00 9,543.00 600.00 8,000.00 900.00 43.00

20,245.00 10,000.00 10,000.00 10,245.00 660.00 8,600.00 940.00 45.00

Pasang Kunci Selot Bahan Kunci Selot Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

53/46

7,500.00

10,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

abk 12-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.13

KOEF 1

Buah

1

Buah

0.01 0.1 0.01 0.0005 1

OH OH OH OH Buah

1

Buah

6.12.1 6.12.2

6.14 6.14.1

6.14.2

0.06 0.6 0.06 0.003 6.15 6.15.1

OH OH OH OH

1

Buah

1

Buah

6.15.2

6.16 6.16.1

0.025 0.25 0.025 0.00125

OH OH OH OH

1

m2

1.1

Pasang Kunci Lemari Bahan Kunci Lemari Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

JUMLAH

10,000.00

15,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

185,000.00

200,000.00

MINIMUM Rp 14,771.50 10,000.00 10,000.00 4,771.50 300.00 4,000.00 450.00 21.50 213,629.00 185,000.00 185,000.00

MAKSIMUM Rp 20,122.50 15,000.00 15,000.00 5,122.50 330.00 4,300.00 470.00 22.50 230,735.00 200,000.00 200,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

28,629.00 1,800.00 24,000.00 2,700.00 129.00

30,735.00 1,980.00 25,800.00 2,820.00 135.00

7,500.00

10,000.00

19,425.00 7,500.00 7,500.00

22,803.75 10,000.00 10,000.00

30,000.00 40,000.00 45,000.00 40,000.00

33,000.00 43,000.00 47,000.00 43,000.00

11,925.00 750.00 10,000.00 1,125.00 50.00

12,803.75 825.00 10,750.00 1,175.00 53.75 68,183.75 60,500.00 60,500.00

m2

50,000.00

55,000.00

0.015 0.15 0.015 0.00075

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,157.25 450.00 6,000.00 675.00 32.25

7,683.75 495.00 6,450.00 705.00 33.75

1

m2

1.1

79,182.25 71,500.00 71,500.00

m2

Pasang Kaca tebal 5 mm Bahan Kaca tebal 5mm

60,000.00

65,000.00

73,155.00 66,000.00 66,000.00

0.015 0.15 0.015 0.00075

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 40,000.00

33,000.00 43,000.00 47,000.00 43,000.00

7,155.00 450.00 6,000.00 675.00 30.00

7,682.25 495.00 6,450.00 705.00 32.25

1

m2

1.1

104,483.75 96,800.00 96,800.00

0.015 0.15 0.015 0.00075

7,683.75 495.00 6,450.00 705.00 33.75

6.17.2

m2

Pasang Kaca Cermin tebal 5 mm Bahan Kaca Cermin

87,000.00

88,000.00

102,857.25 95,700.00 95,700.00

OH OH OH OH

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

7,157.25 450.00 6,000.00 675.00 32.25

6.20.2

413095359.xls

Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor

MAKSIMUM Rp

62,157.25 55,000.00 55,000.00

6.17.1

6.20 6.20.1

Pasang Door Stop Bahan Door Stop Tenaga Pekerja Tukang Kayu Kepala Tukang Mandor Pasang Rel Pintu Dorong Bahan Rel Pintu Dorong

MINIMUM Rp

Pasang Kaca tebal 3 mm Bahan Kaca tebal 3mm

6.16.2

6.17

URAIAN PAKERJAAN

SAT.

53/47

abk 12-14

HARGA BAHAN/UPAH No.

XIII

SNI

KODE

KOEF

URAIAN PAKERJAAN

SAT.

03-7395 - 2008

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN PENUTUP LANTAI dan DINDING 6.3 6.3.1

1

m2

26.5 10.4 0.0450

Buah Kg m3

0.27 0.135 0.014 0.014

OH OH OH OH

1

m2

6.3.2

6.9 6.9.1

6.63 9.8 0.045 1.300

Buah Kg m3 Kg

0.250 0.125 0.013 0.013

OH OH OH OH

1

m'

6.9.2

6.19 6.19.1

5.3 1.14 0.003 0.1

Buah Kg m3 Kg

0.09 0.09 0.009 0.005

OH OH OH OH

1

m2

6.19.2

6.34 6.34.1

10 8.19 0.045 1.62

Buah Kg m3 Kg

0.70 0.35 0.035 0.035

OH OH OH OH

1

m2

6.34.2

6.35 6.35.1

11.87 10.00 0.045 1.50

Buah Kg m3 Kg

0.70 0.35 0.035 0.035

OH OH OH OH

1

m2

6.35.2

6.36 6.36.1

26.5 10.40 0.045 1.62

Buah Kg m3 Kg

0.70 0.35 0.035 0.035

OH OH OH OH

6.36.2

6.39 6.39.1

1 m' 5.3 1.14 0.003 0.025

Buah Kg m3 Kg

0.09 0.09 0.009 0.005

OH OH OH OH

6.39.2

Memasang lantai Ubin PC Abu-abu Uk. 20 x 20 cm Bahan Ubin Abu-abu 20x20 cm Portland Semen Pasir Pasang Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang lantai Ubin Granito Uk. 40 x 40 cm Bahan Ubin Granito 40x40 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Plint Ubin PC Warna Uk. 10 x 20 cm Bahan Plint Ubin PC Warna 10 x 20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Lantai Keramik 33 x 33 cm Bahan Ubin Keramik 33 x 33 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Lantai Keramik 30 x 30 cm Bahan Ubin Keramik 30 x 30 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Pasang Lantai Keramik 20 x 20 cm Bahan Ubin Keramik 20 x 20 cm Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Plint Keramik Ukuran 10x20 cm Bahan Ubin Keramik Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

900.00 1,050.00 125,000.00

1,080.00 1,062.50 140,000.00

14,749.00 17.00 23,850.00 10,920.00 5,625.00

61,973.00 45,970.00 28,620.00 11,050.00 6,300.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

14,732.00 8,100.00 5,400.00 630.00 602.00

16,003.00 8,910.00 5,805.00 658.00 630.00

40,000.00 1,050.00 125,000.00 9,000.00

43,200.00 1,062.50 140,000.00 10,000.00

306,459.00 292,815.00 265,200.00 10,290.00 5,625.00 11,700.00

330,949.50 316,128.50 286,416.00 10,412.50 6,300.00 13,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

13,644.00 7,500.00 5,000.00 585.00 559.00

14,821.00 8,250.00 5,375.00 611.00 585.00

5,000.00 1,050.00 125,000.00 9,000.00

5,500.00 1,062.50 140,000.00 10,000.00

35,892.00 28,972.00 26,500.00 1,197.00 375.00 900.00

39,269.25 31,781.25 29,150.00 1,211.25 420.00 1,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,920.00 2,700.00 3,600.00 405.00 215.00

7,488.00 2,970.00 3,870.00 423.00 225.00

3,333.33 1,050.00 125,000.00 9,000.00

3,888.89 1,062.50 140,000.00 10,000.00

100,217.83 62,137.83 33,333.33 8,599.50 5,625.00 14,580.00

111,460.76 70,090.76 38,888.89 8,701.88 6,300.00 16,200.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,080.00 21,000.00 14,000.00 1,575.00 1,505.00

41,370.00 23,100.00 15,050.00 1,645.00 1,575.00

2,727.27 1,050.00 125,000.00 9,000.00

3,181.82 1,062.50 140,000.00 10,000.00

100,077.73 61,997.73 32,372.73 10,500.00 5,625.00 13,500.00

111,063.18 69,693.18 37,768.18 10,625.00 6,300.00 15,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,080.00 21,000.00 14,000.00 1,575.00 1,505.00

41,370.00 23,100.00 15,050.00 1,645.00 1,575.00

1,140.00 1,050.00 125,000.00 9,000.00

1,400.00 1,062.50 140,000.00 10,000.00

99,415.00 61,335.00 30,210.00 10,920.00 5,625.00 14,580.00

112,020.00 70,650.00 37,100.00 11,050.00 6,300.00 16,200.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,080.00 21,000.00 14,000.00 1,575.00 1,505.00

41,370.00 23,100.00 15,050.00 1,645.00 1,575.00

1,000.00 1,050.00 125,000.00 9,000.00

1,058.82 1,062.50 140,000.00 10,000.00

14,017.00 7,097.00 5,300.00 1,197.00 375.00 225.00

14,981.01 7,493.01 5,611.76 1,211.25 420.00 250.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,920.00 2,700.00 3,600.00 405.00 215.00

7,488.00 2,970.00 3,870.00 423.00 225.00

HARGA BAHAN/UPAH No.

SNI

KODE

6.40 6.40.1

6.43 6.43.1

6.44 6.44.1

KOEF

1 m' 10.6 1.14 0.003 0.05

Buah Kg m3 Kg

0.09 0.09 0.009 0.005

OH OH OH OH

1

m2

1.06 8.19 0.045 0.65

buah kg m3 kg

0.7 0.35 0.035 0.035

OH OH OH OH

1

m2

1.05 0.35

1,000.00 1,050.00 125,000.00 9,000.00

1,058.82 1,062.50 140,000.00 10,000.00

19,542.00 12,622.00 10,600.00 1,197.00 375.00 450.00

20,842.78 13,354.78 11,223.53 1,211.25 420.00 500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,920.00 2,700.00 3,600.00 405.00 215.00

7,488.00 2,970.00 3,870.00 423.00 225.00

375,000.00 1,050.00 125,000.00 9,000.00

390,000.00 1,062.50 140,000.00 10,000.00

455,654.50 417,574.50 397,500.00 8,599.50 5,625.00 5,850.00

476,271.88 434,901.88 413,400.00 8,701.88 6,300.00 6,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,080.00 21,000.00 14,000.00 1,575.00 1,505.00

41,370.00 23,100.00 15,050.00 1,645.00 1,575.00 94,624.00 80,500.00 68,250.00 12,250.00

65,000.00 35,000.00

0.17 0.17 0.017 0.009

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

13,052.00 5,100.00 6,800.00 765.00 387.00

14,124.00 5,610.00 7,310.00 799.00 405.00

1

m2

1.05 0.6

m2 Kg

Memasang Lantai Parquet Jati Bahan Parquet Jati Lem Vynil

140,000.00 32,000.00

150,000.00 35,000.00

204,280.00 166,200.00 147,000.00 19,200.00

219,870.00 178,500.00 157,500.00 21,000.00

0.70 0.35 0.035 0.035

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

38,080.00 21,000.00 14,000.00 1,575.00 1,505.00

41,370.00 23,100.00 15,050.00 1,645.00 1,575.00

1

m2

620.00 1,050.00 125,000.00 9,000.00

700.00 1,062.50 140,000.00 10,000.00

118,585.00 69,625.00 32,860.00 9,765.00 2,250.00 24,750.00

130,191.25 77,001.25 37,100.00 9,881.25 2,520.00 27,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

48,960.00 27,000.00 18,000.00 2,025.00 1,935.00

53,190.00 29,700.00 19,350.00 2,115.00 2,025.00

920.00 1,050.00 125,000.00 9,000.00

1,320.00 1,062.50 140,000.00 10,000.00

102,815.00 53,855.00 24,380.00 9,765.00 2,250.00 17,460.00

119,971.25 66,781.25 34,980.00 9,881.25 2,520.00 19,400.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

48,960.00 27,000.00 18,000.00 2,025.00 1,935.00

53,190.00 29,700.00 19,350.00 2,115.00 2,025.00

375,000.00 35.00 1,050.00 125,000.00 9,000.00

390,000.00 35.00 1,062.50 140,000.00 10,000.00

490,362.11 419,642.11 397,500.00 105.11 13,062.00 3,125.00 5,850.00

513,552.61 436,722.61 413,400.00 105.11 13,217.50 3,500.00 6,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

70,720.00 39,000.00 26,000.00 2,925.00 2,795.00

76,830.00 42,900.00 27,950.00 3,055.00 2,925.00

70,000.00 1,050.00 125,000.00

75,000.00 1,062.50 140,000.00

131,792.50 93,712.50 77,000.00 12,337.50 4,375.00

141,254.38 99,884.38 82,500.00 12,484.38 4,900.00

30,000.00

33,000.00

38,080.00 21,000.00

41,370.00 23,100.00

53 9.3 0.018 2.75

Buah Kg m3 Kg

0.9 0.45 0.045 0.045

OH OH OH OH

1

m2

26.5 9.3 0.018 1.94

Buah Kg m3 Kg

0.9 0.45 0.045 0.045

OH OH OH OH

1

m2

6.54.2

Memasang Dinding Keramik 10x20 cm, Bahan Keramik Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Dinding Keramik 20x20 cm, Bahan Keramik Portland Semen Pasir Pasang Semen Warna Tenaga Pekerja Tukang Batu Kepala Tukang Mandor Memasang Dinding Marmer Ukuran 1.00x1.00 cm Bahan Marmer Paku 12 cm Portlan Semen Pasir Pasang Semen Warna

1.06 3.003 12.44 0.025 0.65

buah buah kg m3 kg

1.3 0.65 0.065 0.065

OH OH OH OH

1

m2

1.10 11.75 0.035

m2 Kg m3

Memasang Dinding Batu Paros / Batu Tempel Hitam Bahan Batu Paros Portland Semen Pasir Pasang

0.70

OH

Tenaga Pekerja

6.55.2

6.57 6.57.1

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

MAKSIMUM Rp

62,500.00 32,000.00

6.53.2

6.55 6.55.1

Memasang Lantai Marmer Ukuran 1.00x1.00 cm Bahan Marmer Portland Semen Pasir Pasang Semen Warna

JUMLAH MINIMUM Rp

m2 kg

6.53.1

6.54 6.54.1

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

MAKSIMUM Rp

89,877.00 76,825.00 65,625.00 11,200.00

6.46.2

6.53

Memasang Plint Keramik Ukuran 10x10 cm Bahan Ubin Keramik Portland Semen Pasir Pasang Semen Warna

MINIMUM Rp

Memasang Lantai Karpet Bahan Karpet Lem

6.44.2

6.46 6.46.1

URAIAN PAKERJAAN

SAT.

6.57.2

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

HARGA BAHAN/UPAH No.

SNI

KODE

6.60 6.60.1

KOEF

MINIMUM Rp 40,000.00 45,000.00 43,000.00

JUMLAH

MAKSIMUM Rp 43,000.00 47,000.00 45,000.00

MINIMUM Rp 14,000.00 1,575.00 1,505.00

MAKSIMUM Rp 15,050.00 1,645.00 1,575.00 127,714.00 107,750.00 99,000.00 8,750.00

0.35 0.035 0.035

OH OH OH

Tukang Batu Kepala Tukang Mandor

1

m2

2.2 0.25

m' kg

Memasang Wall Paper Lebar 50 cm Bahan Wall Paper Lem

40,000.00 32,000.00

45,000.00 35,000.00

114,351.00 96,000.00 88,000.00 8,000.00

0.35 0.175 0.017 0.002

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

18,351.00 10,500.00 7,000.00 765.00 86.00

19,964.00 11,550.00 7,525.00 799.00 90.00

1

m'

0.003 0.05

m3 kg

Memasang Plint Kayu Klas II Ukuran 2x10 cm Bahan Papan Kayu Klas II Paku Sekrup 5 cm

5,800,000.00 100.00

6,200,000.00 110.00

26,603.00 17,405.00 17,400.00 5.00

28,559.50 18,605.50 18,600.00 5.50

0.12 0.12 0.012 0.006

OH OH OH OH

Tenaga Pekerja Tukang Batu Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

9,198.00 3,600.00 4,800.00 540.00 258.00

9,954.00 3,960.00 5,160.00 564.00 270.00

6.60.2

6.63 6.63.1

URAIAN PAKERJAAN

SAT.

6.61.2

HARGA BAHAN/UPAH No.

XIV 03-

SNI

KODE

KOEF

MINIMUM Rp

MAKSIMUM Rp

JUMLAH MINIMUM Rp

MAKSIMUM Rp

PEKERJAAN PENGECATAN

-2002 6.1

1

m2 Kg

Mengikis / Mengerok Permukaan Cat Tembok Lama Bahan Soda Api

0.05

12,000.00

0.15 0.0025

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

1

m2

0.05

6.1.1

6.1.2

6.2 6.2.1

6.3

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

4,607.50 4,500.00 107.50

5,062.50 4,950.00 112.50

1

m2

0.05

5,687.50 625.00 625.00

Kg

Mengerok Karat Cat Lama permukaan Baja dg cara manual Bahan Sabun

11,000.00

12,500.00

5,157.50 550.00 550.00

0.15 0.0025

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

4,607.50 4,500.00 107.50

5,062.50 4,950.00 112.50

1

m2

0.05

5,687.50 625.00 625.00

Kg

Penyabun Permukaan Tembok Lama Bahan Sabun

11,000.00

12,500.00

5,157.50 550.00 550.00

0.15 0.0025

OH OH

Tenaga Pekerja Mandor

30,000.00 43,000.00

33,000.00 45,000.00

4,607.50 4,500.00 107.50

5,062.50 4,950.00 112.50

1

m2

0.08 0.02 0.1

Kg Kg lbr

0.04 0.04 0.004 0.0025

OH OH OH OH

4,780.50 1,440.00 960.00 160.00 320.00 3,340.50 1,320.00 1,720.00 188.00 112.50

1

m2

0.15 0.17 0.17

6.6.2

Mendempul dan Menggosok Kayu Bahan Dempul Jadi Minyak Cat Amplas Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

11,000.00 6,000.00 3,000.00

12,000.00 8,000.00 3,200.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

4,387.50 1,300.00 880.00 120.00 300.00 3,087.50 1,200.00 1,600.00 180.00 107.50

16,980.00 10,980.00 1,800.00 2,550.00 6,630.00

Kg Kg Kg

Pengecatan Bidang Lama Bahan Plamir Cat Dasar Cat Penutup

11,000.00 11,000.00 38,000.00

12,000.00 15,000.00 39,000.00

15,525.00 9,980.00 1,650.00 1,870.00 6,460.00

0.07 0.075 0.0075 0.0025

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

5,545.00 2,100.00 3,000.00 337.50 107.50

6,000.00 2,310.00 3,225.00 352.50 112.50

1

m2

18,777.50

20,275.50

0.2 0.15 0.17 0.26

6.7.1

6.7.2

Kg Kg Kg Kg

Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 2 lap.Cat Penutup Bahan Cat Meni Plamir Cat Dasar Cat Penutup 2 kali

11,000.00 11,000.00 13,000.00 38,000.00

15,000.00 12,000.00 13,200.00 39,000.00

15,940.00 2,200.00 1,650.00 2,210.00 9,880.00

17,184.00 3,000.00 1,800.00 2,244.00 10,140.00

0.07 0.009 0.006 0.0025

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

2,837.50 2,100.00 360.00 270.00 107.50

3,091.50 2,310.00 387.00 282.00 112.50

1

m2

25,947.50

27,819.50

0.2 0.15 0.17 0.35

6.8.1

6.8.2

Kg Kg Kg Kg

Pengecatan Bidang Kayu Baru (1 lap.Plamir) 1 lap.Cat Dasar & 3 lap.Cat Penutup Bahan Cat Meni Plamir Cat Dasar Cat Penutup 2 kali

11,000.00 11,000.00 13,000.00 38,000.00

15,000.00 12,000.00 13,200.00 39,000.00

19,360.00 2,200.00 1,650.00 2,210.00 13,300.00

20,694.00 3,000.00 1,800.00 2,244.00 13,650.00

0.07 0.105 0.004 0.0025

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,587.50 2,100.00 4,200.00 180.00 107.50

7,125.50 2,310.00 4,515.00 188.00 112.50

1

m2

0.36

Ltr

31,000.00

17,102.50 10,440.00 10,440.00

18,262.50 11,160.00 11,160.00

6.9.1

6.9.2

6.10

5,687.50 625.00 625.00

0.15 0.0025

6.6.1

6.9

5,062.50 4,950.00 112.50

12,500.00

6.4.2

6.8

4,607.50 4,500.00 107.50

11,000.00

6.4.1

6.7

33,000.00 45,000.00

Kg

6.3.2

6.6

5,687.50 625.00 625.00

5,157.50 550.00 550.00

6.3.1

6.4

12,500.00

5,207.50 600.00 600.00

Mencuci Bidang Permukaan Tembok yang Pernah dicat Bahan Sabun

6.2.2

6.10.1

413095359.xls

URAIAN PAKERJAAN

SAT.

Pelaburan Bidang Kayu dg Teak Oil Bahan Teak Oil

53/51

29,000.00

abk 14-14

HARGA BAHAN/UPAH No.

SNI

KODE

KOEF

6.10.2

6.11 6.11.1

OH OH OH OH

1

m2

0.15 0.372 2

Ltr Ltr Lbr

0.06 0.016 0.0025

OH OH OH

1

m2

0.35

Ltr

Pelaburan Bidang Kayu dg Cat Residu & Ter Bahan Residu atau Ter

0.1 0.006

OH OH

Tenaga Pekerja Mandor

1

m2

6.12.2

6.13 6.13.1

0.15 0.05 0.1 0.01

Ltr Ltr Lbr Buah

6.13.2

6.14

0.16 0.16 0.016 0.0025

OH OH OH OH

1

m2

0.1 0.1 0.26

Kg Kg Kg

0.02 0.063 0.0063 0.0025

OH OH OH OH

1

m2

0.1 0.18

6.14.1

6.14.2

6.15

Pelaburan Bidang Kayu dg Politur Bahan Politur Politur Jadi Ampelas Tenaga Tukang Cat Kepala Tukang Mandor

Pelaburan Bidang Kayu dg Vernis Bahan Vernis Dempul Ampelas Kuas Tenaga Pekerja Tukang Cat Kepala Tukang Mandor Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Bahan Plamir Cat Dasar Cat Penutup 2 kali Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

33,000.00 43,000.00 47,000.00 45,000.00

JUMLAH MINIMUM Rp 6,662.50 1,200.00 2,520.00 2,835.00 107.50

MAKSIMUM Rp 7,102.50 1,320.00 2,709.00 2,961.00 112.50 26,026.50 22,582.00 4,650.00 11,532.00 6,400.00 3,444.50 2,580.00 752.00 112.50

29,000.00 29,000.00 3,000.00

31,000.00 31,000.00 3,200.00

40,000.00 45,000.00 43,000.00

43,000.00 47,000.00 45,000.00

24,365.50 21,138.00 4,350.00 10,788.00 6,000.00 3,227.50 2,400.00 720.00 107.50

2,500.00

2,700.00

4,133.00 875.00 875.00

4,515.00 945.00 945.00

30,000.00 43,000.00

33,000.00 45,000.00

3,258.00 3,000.00 258.00

3,570.00 3,300.00 270.00

17,242.50 5,215.00 4,350.00 550.00 300.00 15.00 12,027.50 4,800.00 6,400.00 720.00 107.50

18,619.50 5,595.00 4,650.00 600.00 320.00 25.00 13,024.50 5,280.00 6,880.00 752.00 112.50

9,561.00

10,383.60 6,606.00 1,050.00 1,500.00 4,056.00 3,777.60 660.00 2,709.00 296.10 112.50

29,000.00 11,000.00 3,000.00 1,500.00

31,000.00 12,000.00 3,200.00 2,500.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

9,000.00 12,500.00 15,000.00

10,500.00 15,000.00 15,600.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

6,050.00 900.00 1,250.00 3,900.00 3,511.00 600.00 2,520.00 283.50 107.50

7,347.90 4,308.00 1,500.00 2,808.00

Kg Kg

12,500.00 15,000.00

15,000.00 15,600.00

0.028 0.042 0.0042 0.0025

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

2,816.50 840.00 1,680.00 189.00 107.50

3,039.90 924.00 1,806.00 197.40 112.50

1

m2

0.1 0.01

11,954.00 2,150.00 1,800.00 350.00

Kg Kg

Pengecatan Permukaan Baja dg Meni Besi Bahan Meni Besi Perekat / Lem

13,000.00 32,000.00

18,000.00 35,000.00

10,740.00 1,620.00 1,300.00 320.00

0.02 0.2 0.002 0.01

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

9,120.00 600.00 8,000.00 90.00 430.00

9,804.00 660.00 8,600.00 94.00 450.00

1

m2

0.1 0.01 0.002

Kg Kg m3

Pengecatan Permukaan Baja dg Meni Besi & Perancah Bahan Meni Besi Perekat / Lem Perancah Kayu

13,000.00 32,000.00 550,000.00

18,000.00 35,000.00 650,000.00

20,555.00 2,720.00 1,300.00 320.00 1,100.00

22,770.00 3,450.00 1,800.00 350.00 1,300.00

0.25 0.225 0.0225 0.0075

OH OH OH OH

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

17,835.00 7,500.00 9,000.00 1,012.50 322.50

19,320.00 8,250.00 9,675.00 1,057.50 337.50

6.20.1

6.20.2

6.21.1

6.21.2

413095359.xls

30,000.00 40,000.00 45,000.00 43,000.00

MAKSIMUM Rp

6,766.50 3,950.00 1,250.00 2,700.00

6.15.2

6.21

MINIMUM Rp

Pengecat Tembok Lama (1lap.Plamir, 2lap Cat Penutup) Bahan Cat Dasar Cat Penutup 2 kali

6.15.1

6.20

Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

0.04 0.063 0.063 0.0025

6.11.2

6.12 6.12.1

URAIAN PAKERJAAN

SAT.

53/52

abk 14-14

HARGA BAHAN/UPAH No.

SNI

KODE 6.24

KOEF

SAT. 1

m2

0.11 0.17 0.08

Kg Kg Kg

0.50 0.80 0.30 0.20

OH OH OH OH

6.24.1

6.24.2

413095359.xls

URAIAN PAKERJAAN Pengecatan Permukaan Baja lapis Seng (Galvanis) secara Manual sistem 3 lap. Cat Konvensional dg Tebal 200 μm Bahan Cat dasar Cat Antara Cat Penutup Tenaga Pekerja Tukang Cat Kepala Tukang Mandor

53/53

MINIMUM Rp

MAKSIMUM Rp

12,500.00 12,500.00 35,000.00

13,000.00 13,000.00 42,000.00

30,000.00 40,000.00 45,000.00 43,000.00

33,000.00 43,000.00 47,000.00 45,000.00

JUMLAH MINIMUM Rp 75,400.00

MAKSIMUM Rp 81,000.00

6,300.00 1,375.00 2,125.00 2,800.00 69,100.00 15,000.00 32,000.00 13,500.00 8,600.00

7,000.00 1,430.00 2,210.00 3,360.00 74,000.00 16,500.00 34,400.00 14,100.00 9,000.00

abk 14-14