Gsd

  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Gsd as PDF for free.

More details

  • Words: 364
  • Pages: 2
Wm*wffwmffiwwxxffimffim ffiwmffiffi

on YOi"FR

Sramada Samitmrlfnis*rXc* O Launched Fllot Recycled Water Fnojeet @ l-owest $ewen rates of any ssas*side Agency C Launched wet weather proiect to protect Gomrnunity from Overflows and Fines C Roplacing $ewer Fipe on Failing MredioBridge e streamlined Routine gower Fermlt Frocess C working to Maintain oistrict IndeBendence C Fighting Hostile Takeover Attempt C Protected Gsn lnvestments Durrng Recent Financial Gnisis

m Gael Eriekson 4 Years on G$D 6 Years on ltilGG

m Leonard Yloren 12 Years on GSD { 2 Years on $AM 2 Years on MGC

M Ric Lohman 4 Years on G$D 4 Years on SAIUI I Years
we thank yo&rfcn yewr suppsrt mrxffisven*her B

PolicyDifferences LesnardWoren, GaelErickson,Ric Lohman Endorsing Groups

The Two ehallengers

. SierraClub PCF-- the groupthat backedthe . Coastside bungledplanwhichcostHMB$30 Democratic Club . SMCLeaque for Coastside Protectionmillion

Wet Weather BackSewerAuthorityMid-Coastside Backthe muchmoreexpensive parallel pipeline planthat puts ProjectChoice (SAM)approvedplanwith MWSD,

Wet Weather Project Funding LAFCOMerger plan

saving $ 3-7 Million overthe communityin dangerfrom EPA challengers'plan. To be completed by fines.Wants to pay millions for November "Storm Drain System" whichis of 2010,not 3-4 yearsin the future. the County'sresponsibility. Supportplanfor all Coastside Districts Backedby the HMBgroupsthat to sharein cost,as with everyother refusedto paytheirshareand SAMproject.Projectis alsobeneficial stuckGSDfor the bill-- doubling to HalfMoonBav(HMB), the cost to vou,the ratepayers. Standup for community rights.Will Supporttakeover by $30 Million continueto blockmergersponsored bunglersandclosureof GSD by the groupthat just costHMB$30 facilities, Million.

Recycled Water Project

Co-authored currentplanthatis now ProducingRecycledWater for communitv.

to Backed by groupsthat refused withSAI4andpropose cooperate old technoloqvfor plant.

Cooperation with Montara Water and Sewer District

Workdirectlywith MontaraWaterand SanitaryDistrict(MWSD)on recycled waterandWet WeatherFlow Manaqement Proiect Maintainthe lowestrateson the - still14olo Coastside lowerthan in 1997.

of bothMWSD Supportdissolution andGSDin takeoverbid.

Rates

Experiencein local elected offices

Suppofttakeoverby districtswith higherrates.Proposespending $5 million more on wet weather proiect."Promlses" lowerrates. Lohman:B yearsMCC,4 GSD,4 SAM None Erickson: 6 yearsMCC,4 GSD Woren:2 vearsMCC.12 GSD.12 SAM

LocalCoastal Support "CommunityPlan"thatwas Nocomment (LCP) Program developed withthe MCC, the public, andtheSMCPlanning Update Commission. Thisplanis nowendorsed by the California Commission Coastal Philosophyof Promise to keeppolitical by groupthat launched commentary Supported Board outof meetings. Promise to treat the "Truth Squad"in HMBand public, present members or not,with respect. regularlyslanderspublicandother Willbeworking withotherlocal Councilmembersin meetingsand notinsultinq localbloqs. aqencies, them.

Related Documents

Gsd
July 2020 1