Group Assignment

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Group Assignment as PDF for free.

More details

  • Words: 73
  • Pages: 1
Group Assignment 1) MUHAMAD RASYID BIN HASAN 2) MOHD ZULKEFELI BIN SAFIAN EXERCISE 3-9 1) Compute the POR that was in use during January POR = Studio overhead Direct Labor POR = 120,000 75,000 = RM 1.60 2) Complete the following Job Cost Sheet Job Cost Sheet—Lexington Gardens Project As of January 31

Costs of subcontract work

230,000

Direct staff costs

75,0006500 = 68,500

Studio overhead 120,000 Total Cost to January 31 418,500