GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT
PROFORMA REPORT OF MARHI KANOONGO TANK PROJECT UNIT – II CANAL DESIGNED IRRIGATION 700 Ha. TECHNICAL APPROVED CASE ESTIMATED COST Rs. 197.21 LAKHS
TEHSIL – ASHOKNAGAR
DISTRICT - ASHOKNAGAR
JANUARY - 2006
Sub Divisional Officer Water Resources Sub Division Ashoknagar
Executive Engineer Water Resources Division Ashoknagar
GOVERNMENT OF MADHYA PRADESH WATER RESOURCES DEPARTMENT
DETAILED ESTIMATE OF UNIT I - HEAD WORK
BLOCK & TEHSIL – ESAGARH
DISTRICT - ASHOKNAGAR
ESTIMATED COST Rs. 413.04 LAKHS NOVEMBER - 2006
EXECUTIVE ENGINEER WATER RESOURCES DEPARTMENT ASHOK NAGAR ( M. P. )
MARHI KANOONGO NALA TANK PROJECT INDEX S.No
Particulars
1
2
Page No. From To 3 4
GENERAL REPORT & PERFORMA 1
Project at a Glance
1
2
2
General Report
3
8
3
Index Map
9
-
4
Salient Feature
10
13
5
Reconnaissance report report as per T. C. No 25 W / M 61 08 / 12 / 1962 .
14
15
6
Preliminary check statement for general feasibility of project as per T.C.25/W (M) / 61 dated 08/12/1962
16
17
7
Performa to accompany all project estimated to cost more then Rs.5.00 Lakhs .
18
23
8
Performa for administrative approval (in Hindi)
24
25
9
Check statement for minor irrigation scheme to Accompany 70 .
26
28
10
Check list to be furnished for provision in the stage - I estimate of irrigation project with the project submitted for revised administrative approval .
29
32
11
Project check list to be furnished of water resource Department ( in Hindi )
33
36
12 13
Check statement minor irrigation scheme to Accompany T. C. 70 . Check list for according Administrative approved.
37 39
38 40
14
Performa to Accompany AA case vide Govt. of M. P. irrigation department No. 22/89/ M8/3/89 Bhopal at 30.4.1981.
41
-
dated
T. C.
S.No
Particulars
1
2
Page No. From 3
To 4
LETTERS 15
Collector certificate
42
-
16
List of village to be benefited
43
-
17
Willingness of cultivators
44
-
18
Later of D.D.A regarding cropping pattern & water requirement.
45
46
19
Statement showing Agriculture statistic
47
50
WATER PLANNING:20
Rainfall and yield statement in descending order for 40 years.
51
54
21
Month wise delta requirement & cropping pattern
55
56
22
Water planning & water requirement
57
58
23
Fixing of live storage & principle levels
59
60
24
Capacity table
61
-
25
Working table
62
63
CALCULATION & DESIGN 26
Design of Head Sluice
64
-
27
Design of Flush Bar &Fluming of Spill Channel
65
67
28
Calculation of B.C. Ratio
68
-
29
Economics of irrigation scheme
69
-
30
Employment generation
70
-
31
Economics of irrigation scheme Irrigation Revenue Return
71
72
32
Line diagram of Head Work & Canal
72
-
S.No
Particulars
1
2
Page No. From 3
To 4
ABSTRACT COST 32
General Abstract of
73
General Abstract of Unit –I
74
General Abstract of
75
Unit - II
33
Unit –I Head Work Abstract cost of
34
“A” Preliminary
-
76
77
Unit –I Head Work Abstract cost of “B” Land
78
-
35
Unit –I Head Work Abstract cost of “C” Masonry
79
84
37
Unit –I Head Work Abstract cost of “L” Earth work
85
89
38
Unit –I Head Work Abstract cost of “M” Plantation
90
-
39
Unit –I Head Work Abstract cost of “O” Miscellaneous
91
92
40
Unit –I Head Work Abstract cost of “P” Maintenance
93
-
41
General Abstract of
94
-
42
Unit –II Canal Work Abstract cost of
95
96
43
Unit –II Canal Work Abstract cost of “B” Land
97
-
44
Unit –II Canal Work Abstract cost of “C” Masonry
98
107
45
Unit –II Canal Work Abstract cost of “L” Earth work
108
-
46
Unit –II Canal Work Abstract cost of “M” Plantation
109
-
47
Unit –II Canal Work Abstract cost of “O” Miscellaneous
110
111
48
Unit –II Canal Work Abstract cost of “P” Maintenance
112
Unit - II “A” Preliminary
Drawings : -
43
41
L – Section of Bund. & Maximum cross Section of Bund,
113
114
42
Head Sluice & Flush Bar
115
116
Canal L- Section & Structure
117
MARHI KANOONGO NALA TANK PROJECT TEHSIL:- ASHOK NAGAR
DISTRICT:- ASHOK NAGAR PROJECT AT A GLANCE
GENERAL :MARHI KANOONGO Nala tank project envisages the construction of an earthen main dam of 960.0 M long and 11.20M high on local nalla, a tributary of river Parwati in Chambal river , basin intercepting a catchments area of 10.80sq. km. to impound 1.5597 Mcum. of water and to irrigate 240.00Ha. annually with 150 % of crop intensity in 2 No. of village of through a net work of canal system of 2.50km. long and a head discharge of 0.11Cumecs. LOCATION :It is located in the ASHOK NAGAR legislative Assembly Constituency No 29 ASHOK NAGAR of block and tehsil ASHOK NAGAR of district ASHOK NAGAR shown on the survey of India toposheet No. 54-H/5 at a latitude 24º46’00” and longitude 77º16’15”. The dam site is approachable by 3.00 Km long cart track near village Deopur, left side of Patai – Umri asphalt road from 12th Km. after crossing 12.00 km distance from ASHOK NAGAR by NH- 3 A. B. Road, so total distance is 27.00 Km. from district head quarter ASHOK NAGAR. NECESSITY :This project is proposed for irrigation purpose. The cultivators of this area depends upon bore well irrigation of crop. Deep bore well are not successful in this locality. Also drinking water is not available in adequate quantity to full fill the requirement of villagers. This tank will be very helpful to irrigation of crop as well as for irrigation of crop as providing drinking water and raising of water table.
COST :-
The over all cost of the project is to Rs.227.87 Lakhs to provide annual irrigation of 240.00 Ha. and an equivalent area of Rabi 253.33 Ha. The cost of the project on annul irrigation is worked out to Rs 94946 /-per Ha and on equivalent area of Rabi is RS. 89950 /- per Ha. BENEFITS (1)
During construction the employment have been provided to non recurring and recurring the tune of 26352 & 56326 respectively. The I.R.R. comes out 0.109 with B.C. Ratio 1.99
(2)
On completion the project will :Irrigate an area of 240.00 Ha. of C.C.A. with 150 % crop intensity consisting of mixed crop pattern of 80.00 Ha.of Soyabeen in Kharif, 110.00 Ha ordinary wheat and 50.00Ha. hybrid wheat in Rabi.
(3)
Produce additional food grains to the tune of 1900 quintal annually value Rs. 15.20 Lakhs as per the market rate of the year 2006.
(4)
Give a gross revenue of Rs.0.57 Lakhs every year by revenue realization.
(5)
Benefit the cultivators of 2 number of village comprising the population of about 2587 which is population of block.
(6)
Provide study employment to the agricultural labours of the area.
(7)
Increase the water level in the wells of the region to solve the drinking water problem of the area.
(8)
Increase the irrigation percentage of the block from 3.06 % to 3.38 % from government sources.
Executive Engineer Water Resources Sub Division ASHOK NAGAR ( M.P.) Department
Chief Engineer Chambal Betwa Basin Water Resources BHOPAL(M.P.)
MARHI KANOONGO TANK PROJECT TEHSIL-ASHOK NAGAR
DISTT.- ASHOK NAGAR
BRIEF – REPORT 1
INTRODUCTION ASHOK NAGAR district with limited facilities, percentage of irrigation being less
then 4, depends entire on rainfall for the maturity of the crop due to uncertain rainfall the cultivators this area are not able to make their both ends meet. Thus the role of irrigation in the all round integrated development of ASHOK NAGAR district can not be cover emphasized. The mainstay of the majority of the people in area is agriculture. The land is fertile and the farmers are pains taking hard, yet they do not get adequate return for their toil because of scanty rain resulting in poor production 2
NECESSITY Unlike some of the more fortunate area of the country the cultivation in this
region almost entirely depends upon rainfall for the maturity of the crops grown in Kharif and Rabi season and is often subjected to drought conditions owing to the vagaries of mansoon due to its late commencement and early cessation and uncertain winter rains threatening the rainfed crops on whose prospects the economy of the cultivators and the welfares of agricultural labours depends, call for immediate attention to provide irrigation facilities to the crop and employment, to the labourers. Therefore in such a situation the construction of an earthen dam on MARHI KANOONGO nala near village Devpur to irrigate 160.00 Ha of C.C.A. is an imperative need to serve the dual purpose of providing employment to the labour and irrigation facilities to the cultivators. 3
PROJECT SUMMARY MARHI KANOONGO Nala tank project costing to Rs.227.87 Lakhs
envisages the construction of an earthen dam across local nala a tributary to river Parwati of Chambal basin near village Deopur intercepting a catchments area of 10.80 sq.km. to impound capacity 1.5597 M.Cum of water to provide irrigation facilities to 160.00Ha. of C.C.A. in two number of village namely are as deopur and Chackdeopur to poor cultivators of block, Tehsil of district ASHOK NAGAR, where there are no existing irrigation facilities, through a net work of canal system of 2.50 Kms. long with a head discharge of 0.11 cumecs 4
LOCATION :-
It is located in the ASHOK NAGAR legislative Assembly Constituency No 29 ASHOK NAGAR of block and tehsil ASHOK NAGAR of ASHOK NAGAR district represented by shri Kanhiya Lal Agrawal the sitting M.L.A. The dam site is approachable by 3.00 Km long cart track near village Deopur, left side of Patai – Umri asphalt road from 12th Km. after crossing 12.00 km distance from ASHOK NAGAR by NH- 3 A.B. Road, so total distance 27.00 Km. from district head quarter ASHOK NAGAR. It can be located on the survey of India toposheet no.54-H/5 at a latitude 24º46’00” and longitude 77º16’15”. 5
PROJECT PROPOSALS (i)
DAM :A main earthen dam of 960.00 M. long and 11.20M.high maximum across the
nala to impound 1.5592 Mcum of water forming a lake with water spread area57.00 hectares at F.T.L. for irrigation purpose. The zonal section of dam adopted as per
T.C.No. 40 dated
27.12.69. of Chief Engineer, irrigation department. ( ii )
WASTE WEIR :Waste weir of 90.00 m. long bye wash have to be constructed on left flank to
dispose off the 115.57 cumecs the designed discharge . (iii )
HEAD SLUICE :For regulating the water supply in to the canal from the reservoir, a well type
sluice with the Hume pipe barrel of 1000 mm.dia and with the gate size 0.60m. x0.60 m. has been proposed to be constructed, atR.D.660.00 M.of the dam. ( iv )
CANAL SYSTEM :A main canal of 2.50 Km. long with the maximum carrying capacity of 0.11
cumecs head discharge takes off from the head sluice on right flank at R.D.660.00 M. of dam has been proposed.
6
HYDROLOGY : The catchments area of the Nala at the proposed dam site is 10.80 Sq.Km. there is no rain-gauge station in the catchments area. The rainfall data of the ASHOK NAGAR rain gauge station for 36 year has been adopted to work out 75% dependable yield from the catchments area. The 75% dependable rainfall is 740.00mm and the corresponding yield is 0.824 Mcum. per sq. mile of the catchments area . Therefore for whole of the catchments area of10.80 sq, km. with 0.90 dimination factor. 75% dependable yield works out to 3.809 Mcum.
Average annual rainfall 922.50 mm and mean manson run off from catchments area with considering 0.9 diminishing factor calculated is 7.10 Mcum.. 7
DUTIES AND DELTAS The duty adopted for the design of canal is 1311.47 Ha. /Cumecs. The
transmission losses are provided @ 35 % of the field requirement. The delta adopted for 15 cm. for Soyabeen in Kharif, 30 cm.for ordinary wheat and 50 cm. for hybrid wheat in Rabi as recommended by D.D.A.,ASHOK NAGAR 8
CROP PATTERN:
(a)
Existing :-
The gross command area of the project is 225.00 Ha out of which the
cropped area is 160.00 Ha. the crop grown in Kharif are maize, jowar, mung, lineced and others and in Rabi season are ordinary wheat, gram, lentil and Dhaniya etc. all are rainfed crops.
(b)
Proposed :-
Soyabeen 80.00 Ha. Kharif, ordinary wheat 110.00 Ha and
Hybrid wheat 50.00 Ha.in Rabi crop are proposed for irrigation. Thus the proposed annual irrigation is 240.00 Ha and equivalent area of Rabi is 253.33 Ha with the crop intensity of 150 %
9
RESERVOIR It is proposed to store 1.5592 Mcum. of water as gross storage and 0.3790 Mcum of water as dead storage. The dead storage is computed to a silting rate of 0.50 Acre ft. / year / sq. mile of catchments area for the 100 years. Therefore the live storage has been provided 1.1807 Mcum. to irrigation 160.00 hectare of C.C.A.
10 GROSS WATER REQUIRMENT (a)
100 % Kharif requirement :-
0.2700 Mcum.
(b)
100 % Rabi requirement :-
0..8950 Mcum.
Live storage :-
1.1650 Mcum.
(c)
Dead storage provided
:-
Gross storage :-
0.3790 Mcum. 1.5440 Mcum.
11 FIXING OF PRINCIPAL LEVEL OF THE RESERVOIR The principal level of the tank has been fixed are as given as below :-
S No.
Particulars.
12
R.L. in M.
Capacity Required
Capac ity Requir ed
1
Nala Bed Level
( N.B.L.)
89.80 M.
0.3753
0.3790
2
Lowest Sill Level
( L.S.L.)
95.00 M.
1.5597
1.5597
3
Full Tank Level
( F.T.L.)
98.00 M.
-
-
4
Maximum Water Level
( M.WL.)
99.00 M.
-
-
5
Top Bund Level
(T.B.L.)
101.00 M.
-
-
ANNUAL IRRIGATION The irrigation aspects are as under :-
( i ) Gross command area.
:- 225.00 Ha.
( ii )
Culturable command area.
:- 200.00 Ha.
( iii )
Net cropped area.
:- 160.00 Ha.
( iv )
Area proposed for irrigation.
(A)
Kharif ( a )Soyabeen
(B)
:- 80.00 Ha.
Rabi (a)
Ordinary wheat
(b)
Hybrid wheat
:- 110.00 Ha. :- 50.00 Ha.
(v)
Proposed Annual Irrigation
:- 240.00 Ha.
( vi )
Crop intensity
:- 150 %
( vii )
Equivalent area of Rabi
13
:- 253.33 Ha
SUBMERGENCE The area under submergence is situated in village Deopur. The area of submergence at L.S.L.is19.51 hectares and the area at F.T.L. is 57.00 hectares out of whitch the cultivated land is 42.50 hectares witch is within 17.50 % of area proposed for irrigation. No forest and village is likely to be submerged fully partially. 14
DRAINAGE PROBLEM No drainage problem is anticipated in the command as the terrain is steeply sloping and the water table is low.
15
NTERSTATE ASPECTS
The catchments area of the Nala entirely lies in the estate of Madhya Pradesh as such it is considered that there is no interstate problem. 16 PROVISIONS IN THE ESTIMATE Necessary provisions are made under each sub head of estimate of Unit – I Head work and Unit – II Canal which are enclosed. To cover the cost of establishment and T & P need for the project 11 % is added to the cost of Unit –I and Unit –II excluding cost of B- Land under which adequate provision has been made to acquire private land coming under the submergence of the reservoir and additional land required for the construction of a dam and canal system . The over all cost of the project is to Rs.227.87 Lakhs where as unit – I Head work& unit II Canal work amount is Rs. 197.16 /- & Rs. 30.71 /- respectively to provide annual irrigation of 240.00 Ha. of mixed cropping pattern. The Rabi equivalent area in terms of ordinary wheat is 253.33 Ha. The cost per hectare of the project on annual irrigation is to Rs. 94946 /-and on Rabi equivalent area is Rs. 82115 /- which is with in the limits fixed by the Government of M.P. Irrigation Department. The estimate has been framed on the basis of UCSR in force from 1. 9. 2003 of Water Resources Department Government of Madhya Pradesh.
17.
RECOMMENDATION The area under command of the project has been taken on non-tribal area of the district special preference is being given for development of this block. The percentage of irrigation in ASHOK NAGAR Tehsil is very less from Government source i.e 3.06 % Which will be increased 3.38 % after completion of the scheme .As the land under command is fertile and its productivity will be increased highly after irrigation . The cultivators are mainly poor and back ward class with some 10 % percent of s/c and s/t in project area. They will be benefited after completion of this scheme. The cultivators are irrigation minded and will demand water as soon as available to them . Therefore the scheme is highly recommended for according administrative approved.
Executive Engineer Water Resources Division ASHOK NAGAR Department (M.P.)
Chief Engineer Chambal Betwa Basin Water Resources Bhopal
MARHI KANOONGO NALA TANK PROJECT TEHSIL :- ASHOK NAGAR
DISTT. :- ASHOK NAGAR
SALIENT FEARURE S. No.
Particular
Details
1
2
3
I 1
GENERAL MARHI KANOONGO Nala Tank
Name of project
Project ASHOK NAGAR ASHOK NAGAR
2
Block.
3 4
Tehsil District
5
Location
6 7 8 9 10 11 12 II 1
Toposheet No. Name of Nalla/ River/Basin Constituency No & Name Name of sitting M.L.A. Name of sitting M.P. Year of start of work Year of completion HYDROLOGICAL DATA Catchments Area (Sq.Km.)
2
Annual average Rainfall (mm)
3
4 5
ASHOK NAGAR Near Village Deopur Latitude : 24º 46’ 00” Longitude :77º 16 ‘15” 54 H / 5 Local Nala /ParwatiRiver /C.B.basin 29 – ASHOK NAGAR Shri Kanhiya Lal Agrawal Shri Jyotiraditya Sindhiya. As soon as A.A.recipt Two year after A.A. recipt 10.80 Sq.Km.
75% dependable yield with 0.90 Diminishing factor (M Cum.) Mean runoff ( Mcum )
931.81 mm. 3.089 Mcum
7.10 Mcum.
Maximum Flood Discharge (Cumecs)
As per
115.57 Mcum.
Dicken’s formula Q = C M ¾ 1
2
3
6
Maximum rain fall
1402.00 mm
7
Minimum rain fall
377.00 mm
8
Average rain fall
931.81 mm
9
75 % dependable rain fall
740.00 mm
III
RESERVOIR DADA
1
Gross storage capacity
1.5597 M Cum..
2
Live storage capacity
1.1807 M Cum
3
Pond storage capacity
0.3790 M Cum.
4
Submergence at FRL (Cultivated Ha.)
42.50 Ha.
5
Submergence at L.S.L. (Ha.)
19.51 Ha
6
Percentage of live storage to Mean runoff
16.63 %
7
Percentage of live storage to dead storage
311.53 %
IV
DAM
1
Type of dam
Earthen zonal section
2
Length of stop dam
960.00 M
3
Maximum height of stop dam
11.20 M
4
Top width of stop dam
4.50 M.
5
Number of sluice
1 No. Right side
6
Size of sluice gate
0.45M.x 0.45M.
7
Surplushing arrangement
Flush bar
8
Length of waste weir
90.00 M.
9
Maximum discharge through waste weir
115.57 Mcum.
10
Flood lift
1.00 M
11
Quantity of E/W in dam
66196.00 Cum.
12
Side slope
As shown in drawing. 2
1
3
PRINCIPAL LEVELS
V 1
Top bund level
101.00 M
2
Maximum water level
99.00 M.
3
Full tank level
99.00 M.
4
Lowest sill level
95.00 M.
5
Nala bed level
89.20 M.
VI
CANAL
1
Length of main canal
2500.00M..
2
Length of distributaries / branch / minor canal
N.A.
5
Head discharge of main canal
0.122 Cumecs
6
Duty adopted at canal head
1311.47 Ha / Cumecs
7
No. of structures of main canal
10 No.
VIII
COMMAND AREA
1
No. of village to be served
2 No, ( Deopur , Chak Deopur )
2
Gross commanded Area
225.00 Ha.
3
Culturable command area
200.00 Ha.
4
Cropped area
160.00 Ha.
5
Annual irrigation
240.00 Ha
6
Equivalent area
253.33 Ha
7
Irrigation intensity
120 %
8
Cropping intensity
150 %
9
Area proposed to be irrigated 1. Kharif
80.00Ha.
2. Rabi
160.00 Ha.
Total
240.00 Ha.
1 IX
2
3
DELTA AT THE FIELD
1
Soyabeen
150 mm
2
Wheat ( Ord. )
300mm
3
Wheat ( Hyb.. )
500 mm
IX
FINANCIAL ASPECTS ( Rs. )
1
Estimated cost (including over heads charge )
Rs. 227.87lakhs.
2
Unit – I Head Work ( stop dam )
Rs. 197.16 lakhs.
3
Unit –II Canal
Rs. 30.70 lakhs.
4
Cost per Hectare on Cropped area
Rs. 1.424 lakhs / Hactare
5
Cost per Hectare on Annual irrigation
Rs. 0.949 lakhs / Hactare
6
Cost per Hectare on Equivalent area
Rs. 0.899 lakhs / Hactare
st
7
Expenditure As On 31 March 06
Rs. 0.30 Lakhs
8
Balance On 1st April 06
Rs.277.57Lakhs
9
Balance Amount Proposed For NABARD
Rs. 277.57 Lakhs
10
Period Required For Completion work.
24 Months
11
Budget Allocated During Current Year
Nill
12
Employment Generation
13
Non – Recurring ( Man days )
56326
14
Recurring ( Man days /Year)
26352
15
I..R. R.
0.109 %
16
B. C. Ratio
1.99
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
C O L L E C T O R C E RT I F I C AT E This is to certify that an enquiry was conducted in connect on with the scheme for construction of MARHI KANOONGO Nala Tank Project in block and Tehsil ASHOK NAGAR of district ASHOK NAGAR surveyed and proposed by the water resource department the scheme benefit two numbers of villages as detailed in the list enclosed . On the basis of this enquiry , I am satisfied . (i)
That the land in the command area are suitable for irrigation . There is need for irrigation and the crop pattern proposed is appropriate and capable of achievement.
(ii)
The cultivators are of village in the command area are await of the benefit from irrigation and will take water for irrigation as and when the same is made available to them and that there will be no difficulty in the matter of utilization .
(iii)
The cultivators are willing to pay water rates fixed by the state government .
(iv)
There will be no difficulty in the acquisition of lands coming under submergence and required for the construction of canal system .
I, there for , recommend acceptance of the scheme by the state government for approval and execution . Encl : List of village to be benefited .
Collector District Ashoknagar (M.P.)
KANKADA TANK PROJECT LIST OF BENEFITED VILLAGE COMES UNDER COMMAND AREA OF MARHI KANOONGO NALA TANK PROJECT Tehsil – Ashoknagar
Distt.Ashoknagar
S. No.
Village
Block
Vidhan Sabha
Lok Sabha
1
2
3
4
5
1
Deopur
ASHOK NAGAR
ASHOK NAGAR
ASHOK NAGAR – Shivpuri
2
Deopur
ASHOK NAGAR
ASHOK NAGAR
ASHOK NAGAR – Shivpuri
Sub Engineer
Sub Divisional Officer Water Resources Sub Division . ASHOK NAGAR
Executive Engineer Water Resources Division ASHOK NAGAR
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF FLUSH BAR C - MASONRY UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Item of work
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50m lead and 1.5m lift dressing . USR No. 401(b)
22.27
17.70
Cum.
394.00
2
Excavation in disintegrated rock including 50mlead and 1.5m lift with dressing . USR No. 403
111.44
47.40
Cum.
5282.00
3
Filling foundation with cement concreate1:3:6 With 40mm graded metal. USR No. 720(b)
44.59
917.30
Cum.
40902.00
193.82
971.00
Cum.
188199.00
1838.30
Cum.
13601.00
25.40
Sqm.
4
Un coursed and random rubble masonry in : cm 1:5 in plinth and foundation . USR No. 812 L – 827
5
Providing and laying in position cement concrete with graded metal of maximum size 20 mm for coping over walls laid in alternate panel, vibration, finishing, curing 7.40 cleaning etc. complete c c 1:2:4 USR No. 2455(a) Flush pointing to stone work in cm 1:3 USR No. 1133(a) 97.85
6
2485.00
1
2
7
Filling foundation and around masonry works with materials from spoils including watering and ramming etc. complete . USR No. 704
8
Extra lead of materials USR No. 2902 (a) Cement 14 Km.
9
3
4
5
6
95.62
28.20
Cum.
2696.00
24.84
156.33
Cum.
2229.00
(b) Sand
35 Km.
104.86
118.53
Cum.
15585.00
(c) Metal
20 Km.
46.42
90.10
Cum.
5519.00
(d)Rubble
20 Km.
162.81
103.61
Cum.
20131.00
(e)Masonry stone
20 Km.
31.03
126.14
Cum.
5165.00
Total :-
302188.00
Add 5% for W/C & Contingence
(+) Total:-
15109.00 317297.00
Say Rs. 3.17 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK NAGAR (M.P.)
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF HEAD SLUICE C - MASONRY UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Item Of Work
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50m lead and 1.5m lift dressing . USR No. 401(b)
72.46
17.70
Cum.
1283.00
2
Excavation in disintegrated rock including 50mlead and 1.5m lift with dressing . USR No. 403
8.62
47.40
Cum.
409.00
3
Cement concrete 1:3:6 with graded metal of maximum size 40 mm for filling foundation. USR No. 720 ( b )
21.21
917.30
Cum.
19456.00
4
Uncoursed and random rubble masonry in : cm 1:5 in super structure. (super structure. ) USR No. 812 ( I )
16.12
1004.20
Cum.
16188.00
In Circular USR No. 812 ( I ) + 830
25.28
1053.10
Cum.
26622.00
( a ) Fixing in position NP-3 Hume pipe for sluice structure etc. handling, toeing , filing the joints with filler materials 1200 mm . USR No. 2459 ( k )
23.50
229.00
Rm.
5382.00
( b ) Cost as price 1000 mm .
23.50
5325.00
Rm.
125196.00
5
1
2
6
Providing and fixing fine dressed cut stone lintels including setting in cement mortar in 1 : 3 . USR No. 819
0.12
2477.30
Cum.
297.00
7
Puddle filling of good clay 1/c 50 m lead and mixing, watering laying etc. USR No. 2117
19.93
68.40
Cum.
1363.00
8
Pointing to stone with cement mortar 1 : 3 ( a) flush pointing USR No. 1133 ( a )
31.97
25.40
Sqm.
812.00
9
Cement concrete 1:2:4 with graded metal of maximum size 20 mm. USR No. 719 ( c )
3.29
1225.80
Cum.
4033.00
10
Supplying and fixing steel reinforcement bar ( tested ) for R.C.C. including cleaning straightening, cutting, bending , all handling , placing in position and binding with 0.9 mm annealed binding wire confirming to IS 280 – 1978 (including cost on binding wire) USR No. 1304 ( b )
242.61
25.00
Kg.
6065.00
11
Providing and placing in position M15 R.C.C. excluding cost of reinforcement , form work including vibration , finishing , curing and cleaning etc. complete with graded metal of maximum size 20mm USR No. 1602 ( b )
2.01
1614.80
Cum.
3246.00
1 12
2 Form work for R.C.C. in - Situ,
3
3 8.75
4
4 17.90
5
5 Sqm.
6
6 157.00
Thickness not exceeding 20cm., for lintels, beams, columns, etc. including all leads and lifts for all materials . USR No. 1610 ( a ) 13
Fabrication and supply of water tight cast iron, canal gates with rising type arrangement and capstan, embedded parts, spindle road of requisite length, etc. complete as per IS : 3042-1965 (U.S.R. Item No. 2606 ( b )
14
Providing and fixing 1.20 m high railing of 40mm dia. G.I. pipe in three rows at 40cm.C to C with vertical angle 65x65x 6 mm embedded in masonry or in concrete placed at 3 m C to C on top or weirs, dam etc. including providing M. S. plate of size 200 x 200 x 3 mm welded to the bottom of railing post for anchorage. USR No. 2720 Lead of materials USR No. 2902 1. Cement 14 Km. 2. Sand 35 Km. 3. Metal 20 Km. 4. Rubble 20 Km. 5. Masonry stone 20 Km. 6. Hume pipe 14 Km. 7. Cut stone 14 Km.
15
Add 5% for W/C and contingency
Sub Engineer
0.72
34000.00
Sqm.
24480.00
10.42
500.30
Rm.
5213.00
8.11 29.58 24.34 34.62 6.69 23.50 0.12
89.73 148.63 118.90 123.65 66.46 92.72 114.66
Cum. Cum. Cum. Cum. Cum. Rm.. Cum. Total : (+) Total: Say Rs. :- 2.73 Lakhs
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
728.00 4396.00 2894.00 4281.00 445.00 2179.00 14.00 260521.00 13026.00 273547.00
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘M’ PLANTATION UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
-
L.S.
-
30000.00
1
‘M’ – Plantation Down stream of the dam
Total :-
30000.00
Say Rs. 0.30 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘O’ MISCELIANEOUS UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
Provision for foundation ceremony and inauguration expenditure.
-
L. S.
-
20000.00
2
Erection of standard B. M. pillars as per type design No. 8 irrigation department.
-
L. S.
-
10000.00
3
Provision for construction of approach road , quarry to dam site and other materials .
-
L. S.
-
10000.00
4
Provision of photography of dam site and approach road to dam site.
-
L. S.
-
5000.00
5
Repairing charges of vehicles touring , transportation and P.O.L.
-
L. S.
-
20000.00
Provision for purchase of boundary stone and chain ages stone .
-
L. S.
-
15000.00
2
3
4
5
6
-
L. S.
-
20000.00
1
6
1 7
Medical facilities of project
site for two years. 8
Provision for construction and labour compensation .
-
L. S.
-
20000.00
9
Anti malaria operation.
-
L. S.
-
20000.00
10
Provision made for supply of drinking water to labours .
-
L. S.
-
10000.00
Total :-
2,00,000.00
Say Rs. 2.00 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF A - PRILIMINARY UNIT I - HEAD WORK
Labour Rate R = Rs. 88.76 Tehsil -ASHOK NAGAR
Distt. – ASHOK NAGAR
S.No.
Item of Work
Qty.
Rate
Unit
Qty.
1 1
2 Ordinary shrubs ( area below 25% covered by shrubs) clearance involving removal of grass, shrubs, twinge bushes etc .
3 41400.00
4 0.20
Sqm
7 8280.00
38.61
6R
Km.
20562.00
38.61
4R
Km.
13708.00
12 No.
39.20
Each
470.00
LS
-
-
1000.00
3135
0.03 R
RM
8348.00
42.00 21.00 42.00
0.75 R 100 R 200 R
Cum. Cum. Cum.
2796.00 1864.00 7556.00
3
4
5
USR No. 302 2
Chain and compass survey for H/W . USR No. 204 A ( i )
3
Leveling above 15 m interval for H/W . USR No. 206 (a) (iv)
4
Errection of R.C.C. or stone bench mark of 15 cm X 15 cm X 75 cm size as per type design of 6 of water resource department . USR No. 210 (a) (ii)
5
Provision for survey material pipe, paint, lime, pages etc.
6
Dag - belling in all type of soil 100mm X 100 mm deep double spade 'V' shape. USR No. 201 (b)
7
Trial pit or trial trench excavation as per various items of chapter 4 USR No. 202 (a) Hard soil 40% (b) Hard moorum 20% (c) Disintegrated rock 40%
1
2
6
8(a)
Providing chainage - cum - boundary stone made of fine chisel dressed cut stone as per type design 4 of water resources department . USR No. 2137 (a)
214
117.20
Each
25081.00
(b)
Fixing chainage - cum - boundary stone
214
14.80
Each
3167.00
Say Rs. 1.28 Lakhs Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT UNIT I - HEAD WORK
ABSTRACT COST OF C - MASONRY Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Particulars
Amount
1
2
3
1
Cost of sluice
2.73 Lakhs
2
Construction of flush bar
3.17 Lakhs
Total :Total :- Rs.
5.90 Lakhs 5.90 Lakhs
ABSTRACT COST OF L – EARTH WORK UNIT I - HEAD WORK S. No.
Particulars
Amount
1
2
3
1
E / Work for Bund
76.11 Lakhs
2
E / Work for excavation Approach and spill channel
37.55 Lakhs
Total :Total :- Rs.
Sub Engineer
117.49 Lakhs 117.49 Lakhs
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘P’ MAINTENANCE UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
1.5% of C – Masonr y on -
-
Rs. 5.90 2
8850.00
1% of L – Earth Work on Rs. 117.49
117490.00
Total
126340.00
Say Rs. 1.26 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF L – EARTH WORK APPROCH & SPILL CHANNEL UNIT I – HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Item of Work
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in soft or ordinary soil including 50m lead and 1.5m lift with dressing . USR No. 401(a) Excavation in hard soil including 50 m. lead and 1.5m lift with dressing . USR No. 401(b) Excavation in hard moorum and moorum with boulders including 50 m.lead and 1.5m lift with dressing . USR No. 402 Excavation in disintegrated rock including 50m lead and 1.5m lift with dressing . USR No. 403(b) Excavation in soft rock including 50m lead and 1.5m lift with dressing . USR No. 404 Total :Add 5% for W/C and contingency :G. Total :-
14699.87
13.00
Cum.
191098.00
25149.42
17.70
Cum.
445145.00
29399.74
23.70
Cum.
696774.00
22049.81
47.40
Cum.
1045161.00
14699.87
81.50
Cum.
1198039.00
2 3
4
5
3576217.00 178811.00 3755028.00 Say Rs. 37. 55 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF L – EARTH WORK UNIT II – CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Item of Work
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50 m. lead and 1.5m lift with dressing . USR No. 401(b) Excavation in hard moorum and moorum with boulders including 50 m.lead and 1.5m lift with dressing . USR No. 402 Excavation in disintegrated rock including 50m lead and 1.5m lift with dressing . USR No. 403(b) Excavation in soft rock including 50 m. lead and 1.5m lift with dressing . USR No. 404 Construction of out let 15 no.
10158.00
17.70
Cum.
179797.00
8707.00
23.70
Cum.
206356.00
5805.00
47.40
Cum.
275157.00
4353.00
81.50
Cum.
354769.00
15 no.
2000.00
Cum.
30000.00
2
3
4 5
Total :-
1046079.00
Add 5% for W/C and contingency :-
52303.00
G. Total :-
1098382.00
Say Rs. :- 10.98 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF V. R. B. OF MAIN CANAL C - MASONRY UNIT II – CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Item of Works
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50m lead and 1.5m lift dressing . USR No. 401(b)
21.07
17.70
Cum.
373.00
2
Excavation in hard moorum including 50m lead and 1.5m lift dressing . USR No. 401(b)
41.06
23.70
Cum.
973.00
3
Excavation in disintegrated rock including 50mlead and 1.5m lift with dressing . USR No. 403
21.34
47.40
Cum.
1012.00
4
Filling foundation and around masonry work with hard moorum and picked up boulder including watering and ramming USR No. 720 ( b )
10.85
103.80
Cum.
1226.00
5
Cement concrete 1:5:8 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 722 ( b )
10.67
745.00
Cum.
7949.00
1
2
3
4
5
6
6
Cement concrete 1:3:6 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 720 ( b )
0.73
917.30
Cum.
6696.00
7
Uncaused and random rubble masonry in plinth and foundation in cm 1 : 5 USR No. 812 ( i ) – 827
42.24
971.00
Cum.
41015.00
8
Providing and laying in position cement concrete with graded metal of maximum size 20 mm for coping over walls, laid in alternate panel, of 1.5 m, including form work tamping, vibration, finishing, curing cleaning etc. complete C.C .1:2:4 USR No. 2455(a)
0.73
1838.30
Cum.
1342.00
9 (a)
Fixing in position NP-3 Hume pipes for bridges and canal structure i / c handling, toeing , filing the joints with filler materials and cement mortar 1 : 3 curing etc. complete (excluding cost of pipes & collars ) 900 mm dia. USR No. 2458 ( c )
6.00
190.70
Rm.
1144.00
(b)
Cost as price 900 mm dia.
6.00 2277.00
Rm.
13662.00
Sqm.
673.00
10
Flush pointing to stone work in cm 1:3 USR No. 1133(a)
1
2
11
22 Cm. Thick dry stone pitching (without quarry spall) with individual stone of 22 cm. depth and minimum
26.49
3 14.01
25.40
4 278.60
5 Cum.
6 3903.00
size 0.014 Cum. USR No. 1010 12
Filling foundation and around masonry works with materials from spoils including watering and ramming etc. complete . USR No. 704
13
Transportation of materials a) Sand
: 35 Km.
b) Metal
: 20 Km.
c) Cement
25.42
118.53
: 14 Km.
d) Rubble
: 20 Km.
e) Masonry Stone
: 20 Km.
f) Hume Pipe300mm dia :14 Km.
28.20
118.90 89.73 24.14 10.33 5.01
136.73 166.46 69.79
Cum.
717.00
Cum.
2861.00
Cum.
1228.00
Cum.
450.00
Cum.
4851.00
Cum.
1124.00
Rm.
419.00
35.48 6.75 6.00 Total Add 5% on W / C & Contingency G. Total
:::-
91618.00 4581.00 96199.00
4 no. V.R.B. @ 96199 each = Rs. 384796.00 Say Rs. 3.85 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF C.D. WORKS OF MAIN CANAL C - MASONRY UNIT II – CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Item of Works
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50m lead and 1.5m lift dressing . USR No. 401(b)
20.43
17.70
Cum.
760.00
2
Excavation in hard moorum including 50m lead and 1.5m lift dressing . USR No. 401(b)
42.93
23.70
Cum.
1017.00
3
Excavation in disintegrated rock including 50mlead and 1.5m lift with dressing . USR No. 403
11.15
47.40
Cum.
529.00
4
Filling foundation and around masonry work with hard moorum and picked up boulder including watering and ramming USR No. 720 ( b )
7.37
103.80
Cum.
756.00
5
Cement concrete 1:5:8 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 722 ( b )
16.70
745.00
Cum.
12442.00
1
2
3
4
5
6
6
Cement concrete 1:3:6 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 720 ( b )
2.55
917.30
Cum.
2339.00
7
Uncaused and random rubble masonry in plinth and foundation in cm 1 : 5 USR No. 812 ( i ) – 827
58.02
971.00
Cum.
56337.00
8
Providing and laying in position cement concrete with graded metal of maximum size 20 mm for coping over walls, laid in alternate panel, of 1.5 m, including form work tamping, vibration, finishing, curing cleaning etc. complete C.C .1:2:4 USR No. 2455(a)
1.14
1838.30
Cum.
2096.00
9 (a)
Fixing in position NP-3 Hume pipes for bridges and canal structure i / c handling, toeing , filing the joints with filler materials and cement mortar 1 : 3 curing etc. complete (excluding cost of pipes & collars ) 1200 mm dia. USR No. 2458 ( k )
10.00
229.00
Rm.
2290.00
(b)
Cost as price 1200 mm dia.
10.00 2500.00
Rm.
25000.00
Flush pointing to stone work in cm 1:3 USR No. 1133(a)
80.63
Sqm.
2048.00
10
1
2
11
22 Cm. Thick dry stone pitching (without quarry spall) with individual stone of 22 cm. depth and minimum
3 14.01
25.40
4 278.60
5 Cum.
6 3903.00
size 0.014 Cum. USR No. 1010 12
Filling foundation and around masonry works with materials from spoils including watering and ramming etc. complete . USR No. 704
13
Transportation of materials USR No. 704 a) Sand
: 35 Km.
b) Metal
: 20 Km.
c) Cement
: 14 Km.
d) Rubble
: 20 Km.
e) Masonry Stone
: 20 Km.
f) H / P 300mm dia
: 14 Km.
7.63
34.84 17.44 7.55 48.73 9.28 10.00 Total Add 5% on W / C & Contingency G. Total
28.20
148.63 118.90
Cum.
215.00
Cum.
5178.00
Cum.
2074.00
Cum.
677.00
Cum.
6663.00
Cum.
1545.00
Rm.
698.00
89.73 136.73 166.46 69.79 :::-
126567.00 6328.00 132895.00
3 No. C.D. WORKS @ 132895.00 each = Rs. 398685.00 Say Rs. 3.99 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF FALL OF MAIN CANAL C - MASONRY UNIT II – CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Item of Works
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Excavation in hard soil including 50m lead and 1.5m lift dressing . USR No. 401(b)
11.32
17.70
Cum.
200.00
2
Excavation in hard moorum including 50m lead and 1.5m lift dressing . USR No. 401(b)
8.86
23.70
Cum.
210.00
3
Excavation in disintegrated rock including 50mlead and 1.5m lift with dressing . USR No. 403
11.09
47.40
Cum.
526.00
4
Filling foundation and around masonry work with hard moorum and picked up boulder including watering and ramming USR No. 720 ( b )
5.15
103.80
Cum.
535.00
5
Cement concrete 1:5:8 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 722 ( b )
6.57
745.00
Cum.
4895.00
1
2
3
4
5
6
6
Cement concrete 1:3:6 with graded metal of maximum size 40 mm opening and pipe joints. USR No. 720 ( b )
0.63
917.30
Cum.
578.00
7
Uncaused and random rubble masonry in plinth and foundation in cm 1 : 5 USR No. 812 ( i ) – 827
16.68
971.00
Cum.
16196.00
8
Providing and laying in position cement concrete with graded metal of maximum size 20 mm for coping over walls, laid in alternate panel, of 1.5 m, including form work tamping, vibration, finishing, curing cleaning etc. complete C.C .1:2:4 USR No. 2455(a)
1.37
1838.30
Cum.
2518.00
9
Flush pointing to stone work in cm 1:3 USR No. 1133(a)
38.84
25.40
Sqm.
987.00
10
22 Cm. Thick dry stone pitching (without quarry spall) with individual stone of 22 cm. depth and minimum size 0.014 Cum. USR No. 1010
6.86
278.60
Cum.
1911.00
12
Filling foundation and around masonry works with materials from spoils including watering and ramming etc. complete . USR No. 704
6.57
28.20
Cum.
185.00
3
4
1 13
2 Transportation of materials USR No. 704 a) Sand
: 35 Km.
5
6
b) Metal
: 20 Km.
c) Cement
: 14 Km.
d) Rubble
: 20 Km.
Cum.
e) Masonry Stone
: 20 Km.
Cum.
1688.00 868.00
Cum.
229.00
Cum. 11.36
148.63
7.30
118.90
2.55
89.73
21.73
136.73
2.66
166.46
Total Add 5% on W / C & Contingency G. Total
2971.00
Cum.
:::-
443.00
34940.00 1747.00 36687.00
3 No. FALL @ 36687.00 each = Rs. 110061.00 Say Rs. 1.10 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF A - PRILIMINARY UNIT II- CANAL
Labour Rate R = Rs. 88.76 Tehsil -ASHOK NAGAR
Distt. – ASHOK NAGAR
S.No.
Item of Work
Qty.
Rate
Unit
Qty.
1 1
2 Ordinary shrubs ( area below 25% covered by shrubs) clearance involving removal of grass, shrubs, twinge bushes etc .
3 15000.00
4 0.20
Sqm
7 3000.00
30.00
6R
Km.
15977.00
30.00
4R
Km.
10651.00
12 No.
39.20
Each
470.00
LS
-
-
1000.00
500.00
0.03 R
RM
1331.00
21.50 15.00 10.00
0.75 R 100 R 200 R
Cum. Cum. Cum.
1431.00 1331.00 1775.00
3
4
5
USR No. 302 2
Chain and compass survey for H/W . USR No. 204 A ( i )
3
Leveling above 15 m interval for H/W . USR No. 206 (a) (iv)
4
Errection of R.C.C. or stone bench mark of 15 cm X 15 cm X 75 cm size as per type design of 6 of water resource department . USR No. 210 (a) (ii)
5
Provision for survey material pipe, paint, lime, pages etc.
6
Dag - belling in all type of soil 100mm X 100 mm deep double spade 'V' shape. USR No. 201 (b)
7
Trial pit or trial trench excavation as per various items of chapter 4 USR No. 202 (a) Hard soil 40% (b) Hard moorum 20% (c) Disintegrated rock 40%
1
2
6
8(a)
Providing chainage - cum - boundary stone made of fine chisel dressed cut stone as per type design 4 of water resources department . USR No. 2137 (a)
170.00
117.20
Each
19924.00
(b)
Fixing chainage - cum - boundary stone
170.00
14.80
Each
2516.00
Say Rs. 0.88 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘M’ PLANTATION UNIT II – CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
Provision made of ‘M’–
-
L.S.
-
20000.00
Plantation with different kind of trees at the place available along the canal Total :-
20000.00 Say Rs. 0.20 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘O’ MISCELIANEOUS UNIT I - HEAD WORK
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
Provision for foundation ceremony and inauguration expenditure.
-
L. S.
-
5000.00
2
Erection of standard B. M. pillars as per type design No. 8 irrigation department.
-
L. S.
-
2000.00
3
Provision for construction of approach road , quarry to dam site and other materials .
-
L. S.
-
2000.00
4
Provision of photography of dam site and approach road to dam site.
-
L. S.
-
5000.00
5
Repairing charges of vehicles touring , transportation and P.O.L.
-
L. S.
-
5000.00
Provision for purchase of boundary stone and chain ages stone .
-
L. S.
-
3000.00
2
3
4
5
6
-
L. S.
-
5000.00
1
6
1 7
Medical facilities of project
site for two years. 8
Provision for construction and labour compensation .
-
L. S.
-
1000.00
9
Anti malaria operation.
-
L. S.
-
1000.00
10
Provision made for supply of drinking water to labours .
-
L. S.
-
1000.00
Total :-
30000.00
Say Rs. 0.30 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT OF ‘P’ MAINTENANCE UNIT II - CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty.
Rate
Unit
Amount
1
2
3
4
5
6
1
1% of C – Masonr y on -
-
Rs. 8.94 2
8940.00
1% of L – Earth Work on Rs. 10.98
10980.00
Total
19920.00
Say Rs. 0.20 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT C – MASONARY ABSTRACT COST OF CANAL STRUCTURES UNIT II - CANAL
Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
particulars
No. Of Structure
Unit Cost Of Structure
Amount in lakhs
1
2
3
4
5
1
Construction of FALL
3
36687.00
1.10
2
Construction of V.R.B.
4
96199.00
3.85
3
Construction of CD WORK
3
132895.00 Total : Say Rs.
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
3.99 8.94 Lakhs 8.94 Lakhs
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF B - LAND UNIT II – CANAL Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty. in Ha.
Rate in Lakhs
Unit
Amount in Lakhs
1
2
3
4
5
6
4.5 Ha.
1.00
Ha.
4.50
-
-
-
-
1
Provision for land compensation for unit – II canal . ( R.D. 0.0 m to 2500.00 m )
2
REVENU LAND :-
Nil
FOREST LAND :-
Nil
3
4
WELL :(1)Well Pacca (2)Well Kachha HOUSE :-
Nil Nil Nil
-
-
-
-
-
-
5 Total :-
4.50
(i) Add 30 % for compulsory compensation on culturable land
1.35
(ii) Add 10 % for revnu charges
0.45
(iii) Add 12 % for Surcharge, standing crop etc.
0.54
G. Total :-
6.84 Say Rs. 6.84 Lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division
Executive Engineer Water Resources Division
ASHOK NAGAR (M.P.) NAGAR (M.P.)
ASHOK
MARHI KANOONGO NALA TANK PROJECT ABSTRACT COST OF B - LAND UNIT I – HEAD WORK Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S.No.
Particulars
Qty. in Ha.
Rate in Lakhs
Unit
Amount in Lakhs
1
2
3
4
5
6
42.50 Ha.
0.95
Ha.
40.375
-
-
Nil Nil
-
-
Nil
-
-
-
-
1
Provision for land compensation for unit – II canal . ( R.D. 0.0 m to 2500.00 m )
14.50 2
REVENU LAND :Nil FOREST LAND :-
3
4
WELL :(1)Well Pacca (2)Well Kachha HOUSE :-
-
5 Total :-
40.375
(i) Add 30 % for compulsory compensation on culturable land
12.113
(ii) Add 10 % for revnu charges
4.038
(iii) Add 12 % for Surcharge, standing crop etc.
4.845
G. Total :-
61.371 Say Rs. 61.37 Lakh
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK NAGAR (M.P.)
MARHI KANOONGO NALA TANK PROJECT GENERAL ABSTRACT UNIT II – CANAL Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Particular
Amount in lakhs
1
2
3
1
CIVIL WORKS :A -
Preliminary.
B -
Land
C -
Masonry
K -
Building
L -
Earth work
M-
Plantation
O -
Miscellaneous
P -
Maintenance
0.88 6.84 8.94 Nil 10.98 0.20 0.30 0.20
Total :Add 11% for T & P and Establishment charge except on B – Land (On Rs. 21.50 ) :-
28.34
G. Total
30.705
:-
2.365
Say Rs. 30.71 lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT GENERAL ABSTRACT UNIT I – HEAD WORK Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Particular
Amount in lakhs
1
2
3
1
CIVIL WORKS :A -
Preliminary.
B -
Land
C -
Masonry
K -
Building
L -
Earth work
M-
Plantation
O -
Miscellaneous
P -
Maintenance
1.28 61.37 Nil 117.49 0.30 2.0 1.26
Total :Add 11% for T & P and Establishment charge except on B – Land (On Rs. 122.33 ) :-
183.70
G. Total
197.16
:-
13.46
Say Rs. 197.16 lakhs
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT GENERAL ABSTRACT Tehsil – ASHOK NAGAR ASHOK NAGAR
Distt. –
S. No.
Particular
Amount in lakhs
1
2
3
1
Unit I – Head Work
197.16
2
Unit II – Canal
30.71
Total
227.87 Say Rs. 227.87
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR (M.P.) NAGAR (M.P.)
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT Tehsil – ASHOK NAGAR
Distt. –
ASHOK NAGAR
ECONOMICS OF IRRIGATION SCHEME SERVICE AREA 160 Ha PRE-DEVELOPMENT :S.No.
Name of Crop
1 1
2 KHARIF :Soyabeen
2
RABI :Wheat(ori) Gram Total :-
Area under cultivation Ha 3
Cost of cultivation Rs./ Ha 4
Total cost of cultivation In Lakhs 5
Yield Ha /Qtl. 6
Total Yield Qtl. 7
Rate per Quintal 8
Total Value of Production In Lakhs 9
40
5500
2.20
11
440
1000
4.40
50 70 210
5500 5500
2.75 3.85 8.80
12 12
600 840
600 600
3.60 5.04 13.04
Area under cultivation Ha 3
Cost of cultivation Rs./ Ha 4
Total cost of cultivation In Lakhs 5
Yield Ha /Qtl. 6
Total Yield Qtl. 7
Rate per Quintal 8
Total Value of Production In Lakhs 9
80
2800
2.24
15
1200
1100
13.20
110 50 240
2300 5500
2.53 2.75 7.52
18 12
1980 600
600 600
11.88 3.60 18.68
POST-DEVELOPMENT :S.No.
Name of Crop
1 1
2 KHARIF :Soyabeen
2
RABI :Wheat(ori) Wheat(hyb) Total:-
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR ASHOK NAGAR
Executive Engineer Water Resources Division
MARHI KANOONGO NALA TANK PROJECT Tehsil – ASHOK NAGAR
Distt. –
ASHOK NAGAR
BENEFIT COST RATIO
S.No.
Particulars
1 1
2
3
Amount in lakhs
2
3
BEFORE IRRIGATION. i Value of total agriculture production ii Expenditure of cultivation iii Net value of production
13.04 8.80 4.24
AFTER IRRIGATION. iv Value of total agriculture production V Expenditure of cultivation vi Net value of production vii Net Benefit
18.68 7.52 11.16 6.92
CALCULATION OF B.C. RATIO viii Total Estimated Cost = Rs. 227.87 Lakhs ix Interest of capital cost On @ 5 % x Interest of capital cost on Rs. 227.87 Lakhs 11.394 xi Depreciation 1 % on capital cost 2.279 xii Administrative charges Rs. 50 /Ha on 224 Ha 0.112 Total 13.785 B. C. RATIO 1.99
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR ASHOK NAGAR
On @ 10 % 22.787 2.279 0.112 25.178
Executive Engineer Water Resources Division
MARHI KANOONGO NALA TANK PROJECT Tehsil – ASHOK NAGAR
Distt. –
ASHOK NAGAR
EMPLOYMENT GENERATION S.NO.
PARTICULARS
UNIT
DETAIL
1
2
3
4
Ha Labors / Ha
240 98 23520
Ha Rs./ Ha
240 80.00 19200.00 89.00 216 26352
A (a)
(b)
B
RECURRING EMPLOYING :For farm development :Designed I.A. Norms adopted Total Man days For farm maintenance :Designed I.A. Norms adopted Maintenance Amount Rs. Labour rate Man days Man days per Year
Rs./ day No.
NON RECURRING EMPLOYING :Total cost of project Labour component Labour Rate Man days
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR ASHOK NAGAR
Lakhs 22 % Rs. Per day No.
227.87 60.80 89.00 68315
Executive Engineer Water Resources Division
MARHI KANOONGO NALA TANK PROJECT Tehsil – ASHOK NAGAR
Distt. ASHOK NAGAR
SALIENT FEARURE 1.
Name of project
: MARHI KANOONGO Nala Tank- Project
2.
Tehsil
: ASHOK NAGAR
3.
District
: ASHOK NAGAR
4.
Location
: Near Village Devpur : Latitude : 24° 46’ 00” : Longitude :77° 16′ 15”
5.
Toposheet No.
6.
Name of Nalla/ River/Basin
: 54 H / 5 : Local Nala / Parwati River / Chambal basin
7.
Year of start of work
: Just after A.A. received
8.
Year of completion
: 2 years after A.A. received
HYDROLOGICAL DATA 1. Catchments Area (Sq.Km.) 2. Maximum Flood Discharge (Cumecs)
: 10.80 Sqkm. : 115.57 Cumecs
3. Annual Rainfall
: 931.81
4. Maximum
:1402.00 mm
5. Minimum
: 377.00 mm
6. Dependable
: 740.00
7. 75% depndable yield as per Binni’s table including 0.90 dimension factor
: 3.809 Mcum
. 8. Mean runoff with 0.90 diminishing factor with 75% dependable yield .
: 7.10 Mcum
.
RESERVOIR DATA 1. Gross storage capacity
: 3.1852 M Cum.
2. Live storage capacity
: 2.5590 M Cum.
3. Dead storage capacity
: 0.6262 M Cum.
4. Submergence at FRL (Ha.)
: 117.00 Ha.
5. Submergence at LSL (Ha.)
: 15.21 Ha.
6. Percentage of live storage to Mean runoff
: 33.67 %
DAM 1. Length of Dam (m)
: 1045.00 m
2. Maximum height of dam (m)
: 12.12 m.
3. Top width of dam (m)
: 5.00 m.
4. Number of sluice
: 1 No R / S at R.D 1020 m.
5. Surplushing arrangement
: Flush bar 185 m
6. Quantity of E/ W in Dam
: 66196cum.
7. Length of waste weir
:185.00 m.
8. Maximum discharge of w/w
:221.69 Cumecs
PRINCIPAL LEVELS 1. Top bund level
: 100.40M.
2. Maximum water level
: 98.40M.
3. Full tank level
: 97.50 M.
4. Lowest sill level 5. Nalla bed level
: 95.00M. : 88.28 M.
6. CANAL 1. Length of main canal
: 4950 m.
2. Length of branch canal
: Nil
3. Length of Distributaries
: Nill
4. Head discharge of canal
: 0.408cumec
DUTY ADOPTED 1.
Canal outlet
: 931.52 Ha/ cume
2. Tank Duty
: 207 Ha/ mcum.
DELTA AT THE FIELD 1.
Soyabean
: 150 mm
2.
Wheat (Hyv)
: 500 mm.
3.
Wheat (Ori)
: 300 mm.
4.
Alsi
: 220 mm.
5.
Gram
: 220 mm.
AREA COMMANDED 1. No. of village to be served
: 3 No ( Banaura, Mintpura, Ramgarh Chak)
2. Gross commanded Area
: 1153 Ha.
3. Culturable command area
: 753 Ha.
4. Cropped area
: 525 Ha.
5. Area proposed to be irrigated i. Rabi
: 310 Ha.
ii. Kharif
: 215 Ha. Total
: 525 Ha.
FINANCIAL ASPECTS ( Rs. ) 1. Estimated cost
: Rs. 523.00 lakhs.
( including over Head charge i. Unit –I Work
: Rs. 413.04 lakhs.
ii. Unit –II Canal 2.
: Rs. 113.12 lakhs.
Cost per Hectare
: Rs. 0.997 lakhs/Hactare
3. Expenditure As On 31st March 06
: Nil
4. Balance On 1st April 06
: 523.67 Lakhs
5. Balance Amount Proposed For
: 523.67 Lakhs
A I V P Assistance 6. Period Required For Completion ( Month ) 7. Budget Allocated During Current Year
: 24 Months : 20 Lakhs
8. Employment Generation I. Non – Recurring ( Mandays ) II. Recurring ( Mandays )
: 1.29 Lakhs : 1.09 Lakhs
III. B. C. Ratio
: N.A.
IV. I. R. R.
: N.A.
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR
Executive Engineer Water Resources Division ASHOK NAGAR
APPROVED WATER REQUIRMENT OF CROPS FOR MARHI KANOONGO TANK PROJECT (Month wise water requirement for crops) Tehsil:- Ashoknagar Name of crops
Area in Ha.
Area in Acre
Oct.
Nov.
Dec.
1
2
3
4
5
6
7
8
9
10
1 i
KHARIF Soyabeen
300
741.00
3”/2223
-
-
-
-
2 i
RABI Wheat (Ori ) Gram
175
432.25
-
-
4”/1729
4”/1729
175
123.25
-
3”/1296.75
-
ii
Total
3”/2223
Add 35% field losses20% canal losses 15% Total Requirement Total area
778.05
459.86 605.15
3001.05
1750.61 2334.15
650
Total in Mcuft.
3”/1296.75 4”/1729
Jan.
Feb.
March April
May
June
11
12
13
14
15
16
17
-
-
-
-
-
-
3”/2223
6”/4446
4”/1729
-
-
-
-
-
-
-
12”/5187
3”/1296.75
2”/864.5
-
-
-
-
-
-
-
8”/3458
7”/3025.75
6”/2593.5
-
-
-
-
-
-
1059.01
907.73
-
-
-
-
-
-
4084.16
3501.23
-
-
-
-
-
-
800.28
14.83
12.71
-
-
-
-
-
-
2.90
13091 207.48
4581.8 5 17672.85
1605.50 10.89
3.36 8.47
Water requirement for crop for 650.0 Ha. 1605.50Acre, above 64.15 Mcuft or 1.815 Mcum. Live storage capacity at F.T.L. is 2.03 Mcum. Sub Engineer
Ditrict:- Ashoknagar Total AcreJuly Aug Sept inch
Sub Divisional Officer Water Resources Sub Division Ashoknagar
Sd/Dy. Director Agriculture Ashoknagar
64.15
MONTH WISE DELTA REQUIREMENT FOR CROPS OF MARHI KANOONGO NALA TANK PROJECT STATEMENT SHOWING THE WATER REQUIREMENT AND CROPPING PATTERN District.:-Ashoknagar
Tehsil:- Ashoknagar Name of crops
Area in Ha.
Area in Acre
Oct.
Nov.
Jan.
Feb.
March. April
7
8
9
10
May
June
July Aug
Sept
11
12
13
14
15
16
1 1 i
2 KHARIF
3
4
5
Soyabeen
300
741
3”/900
-
-
-
-
-
-
-
-
-
-
3”/900
6”/1800
2 i
RABI Wheat (Ori ) Gram
175
432.25
-
-
4”/700
4”/700
4”/700
-
-
-
-
-
-
-
12”/2100
175
432.25
-
3”/525
-
3”/525
2”/350
-
-
-
-
-
-
-
8”/1400
650
1605.5 0
3”/900
3”/525
4”/700
3”/525
6”/1050
-
-
-
-
-
-
3”/900
26”/5300
ii
Total
6
Dec.
Total Ha-Inch. 17
It is assumed that canal will run for 21days for 12 hours in a month =21 x 12 x 60 x 60 =907200 seconds Maximum draw off in the month Jan.= 1225 x 2.47 x43560 / 12 X 1000000 = 10.983 Mcum = 10.983 Mcum Add 15 %for future expansion = 0.15 x 10.983 = 1.647 Mcum Add 15 % for out of command = 0.15 x 10.983 = 1.647 Mcum Add 35 % for canal losses = 0.35 x 10.983 = 3.84 Mcum Total draw off = 18.121 Mcum Total draw off in cusecs (18121000 /907200 ) = 19.975 Cusecs or 0.565 Cumecs Duty at canal in Acre / Cusecs = ( 1605.05 - 741 ) /19.975 = 43.26 Acre /Cusecs Say. 43 Acre /Cusecs 620 Ha./Cumecs Sub Engineer Resources Division Ashok nagar
Sub Divisional Officer Water Resources Sub Division Aashok nagar
Executive Engineer Water
MARHI KANOONGO NALA TANK PROJECT LINE DIAGRAM OF HEAD WORK
END OF DAM
HEAD SLUICE
NALA
& SPILL CHANNEL.
APPROACH
R.D. 660 M.
R.D. 90.0 M.
R. D. 0.0 M
R. D. 90.0 M
DAM
STRUCTURES DETAILS OF CANAL
S. No.
Description
No. of Structure
1
2
3
1
FALL
3
2
V.R.B.
4
3
C. D. WORK
3
Sub Engineer
Sub Divisional Officer Water Resources Sub Division ASHOK NAGAR NAGAR
Executive Engineer Water Resources Division ASHOK
MARHI KANOONGO NALA TANK PROJECT Unit – II Canal Tehsil:- Ashoknagar
District.:-Ashoknagar
LIST OF STRUCTURES ON R. B. C. S. No.
Chainage
R. D. in Meters
Name of Structure
Remark
1
2
3
4
5
1 2 3 4 5 6 7 8 9 10 11 12 13 14
18.00 18.30 33.00 29.57 44.00 54.50 70.00 101.00 105.00 122.00 113.50 142.50 147.50 151.66
540 555 990 1035 1320 1635 2100 3030 3150 3660 4095 4275 4425 4550
Sub Engineer
V. R. B. Aqueduct V. R. B. C. D. C. D. C. D. V. R. B. Aqueduct V. R. B V. R. B C.D. C.D. V.R.B. C.D.
Sub Divisional Officer Water Resources Sub Division Ashoknagar
Porkhi to Mathner C.A. 1.75 Sq. Km. Hinotiya to Mathner C. A. 0.17 Sq. Km. C. A. 0.08 Sq. Km. C. A. 0.15 Sq. Km. Paricha to Hinotiya C.A. 1.75 Sq. Km. Paricha to Marhi Marhi to Semeri C. A. 0.21 Sq. Km. C. A. 0.08 Sq. Km. Marhi to Mathner C. A. 0.09 Sq. Km.
Executive Engineer Water Resources Division Ashoknagar
MARHI KANOONGO NALA TANK PROJECT Unit – II Canal Tehsil:- Ashoknagar
District.:-Ashoknagar
LIST OF STRUCTURES ON L. B. C. Chainage
R. D. in Meters
Name of Structure
Remark
1
2
3
4
5
1 2 3 4 5 6 7 8 9 10 11 12 13
18.00 18.30 33.00 29.57 44.00 54.50 70.00 101.00 105.00 122.00 113.50 142.50 147.50
90 300 630 1290 1690 1800 2595 2670 3750 3778 3780 3960 4260
S. No.
Sub Engineer
C.D. C.D. cum escape V. R. B. C. D. V. R. B. C. D. C.D.. V. R. B. C.D. V. R. B Fall C.D. C.D..
Sub Divisional Officer Water Resources Sub Division Ashoknagar
C.A. 0.022 Sq. Km C.A. 0.34 Sq. Km. Hinotiya to Jalalpur C. A. 0.28 Sq. Km. Hinotiya to Bajeetpur C. A. 0.25 Sq. Km. C. A. 0.35 Sq. Km. Hinotiya to Paricha C. A. 0.15 Sq. Km. Satuthdi to Semeri 1.00 m. drop C. A. 0.15 Sq. Km. C. A. 0.10 Sq. Km.
Executive Engineer Water Resources Division Ashoknagar
MARHI KANOONGO NALA TANK PROJECT Unit – II Canal Tehsil:- Ashoknagar
District.:-Ashoknagar
CHAK STATEMENT FOR L.B.C. S. No. Chainage 1 1 2 3 4 5 6 7 8 9 10
Sub Engineer
2 10 21 43 60 86 108 125 132 142 146
R. D. Name of in Off take Meters 3 4 300 OR 1 630 OR 2 1290 OR 3 1800 OR 4 2580 OR 5 3240 OR 6 3750 OR 7 3960 OR 8 4260 OR 9 4380 Tail
Total area in Ha. Reach 5 0-300 300-630 630-1290 1290-1800 1800-2580 2580-3240 3240-3750 3750-3960 3960-4260 4260-4380
Sub Divisional Officer Water Resources Sub Division Ashoknagar
G. C. A.
C. C. A.
I. A.
6 17.00 14.10 21.60 12.00 36.50 45.00 35.70 32.90 10.30 9.40
7 13.60 11.28 17.28 9.60 29.20 36.00 28.56 26.32 8.24 7.52
8 10.80 9.00 13.80 7.80 23.40 28.80 22.80 21.00 6.60 6.00
Remark
Executive Engineer Water Resources Division Ashoknagar
9
MARHI KANOONGO NALA TANK PROJECT Unit – II Canal Tehsil :- Ashoknagar
District.:-Ashoknagar
CHAK STATEMENT FOR R.B.C. S. No. Chainage 1 1 2 3 4 5 6 7 8 9 10 11
Sub Engineer
2 18 34 44 54 76 104 123 136 142 152 171
R. D. Name of in Off take Meters 3 4 540 OL 1 1020 OL 2 1320 OL 3 1620 OL 4 2280 OL 5 3120 OL 6 3690 OL 7 4080 OL 8 4260 OL 9 4560 OL 10 5130 Tail
Total area in Ha. Reach 5 0-540 540-1020 1020-1320 1320-1620 1620-2280 2280-3120 3120-3690 3690-4080 4080-4260 4260-4560 4560-5330
Sub Divisional Officer Water Resources Sub Division Ashoknagar
G. C. A.
C. C. A.
I. A.
6 15.90 16.70 15.30 13.50 22.80 33.70 39.80 40.00 23.50 27.30 66.20
7 12.72 13.36 12.24 10.80 18.24 26.96 31.84 32.00 18.80 21.84 52.96
8 10.10 10.60 9.70 8.50 14.50 21.40 25.30 25.40 15.00 17.30 42.20
Remark
Executive Engineer Water Resources Division Ashoknagar
9
MARHI KANOONGO TANK PROJECT Tehsil - Ashoknagar
Distt.- Ashoknagar FIXTING OF PRINCIPLE LEVEL
1. Catchment Area :- 24.48 Sqkm.or 9.44 Sqmile 2. Raingauge Station:- Ashoknagar. 3. 75% Dependable rainfall :-660.00 mm. 4. 75% Dependable yield with 0.90 diminishing factor for 9.44 Sqmile:- 3.3441 Mcum I. L. S. L. ( Dead Storage ) :Silt to be deposited in 100 year from 9.934 Sq.mile catchments area. =
½ Ac ft. / Year / Sq.mile of CA for 50 years.
=
½ x 43560 x 9.44 x 50 x0.0283 / 10
=
0.29103 M Cum.
Storage capacity is found at R.L. 495.00 M. where the capacity is 0.2938 M Cum. 75% dependable yield with 0.90 diminishing factor is 3.3441 MCum. Dead storage is kept 0.2938 M Cum. Gross storage = 75% dependable yield + Dead storage 3.3441+ 0.2938 = 3.6379 M Cum. The topography of side is not suitable to store such quantity of water Hight level of both flank is 501.50 Minimum free board Flood lift
::-
1.80 M. 0.60 M.
Hence principal level are fixed as below S. No. 1 1 2 3 4
Sub Engineer
Particular 2 T. B. L. M. W. L. F. T. L. L. S. L.
Levels 3 501.50 M. 499.70 M. 499.10 M. 495.00 M.
Sub Divisional Officer Water Resources Sub Division Ashoknagar
Capacity 4 2.6112 MCum 2.0305 MCum 0.2938 MCum
Executive Engineer Water Resources Division Ashoknagar