PROPOSAL FOR
UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS
(Name of Polytechnic)
Place (State)
Under the Scheme of Sub-Mission on Polytechnics under the Coordinated Action for Skill Development
Submitted to
GOVERNMENT OF INDIA MINISTRY OF HUMAN RESOURCE DEVELOPMENT (DEPARTMENT OF HIGHER EDUCATION) SHASTRI BHAWAN NEW DELHI
FORMAT FOR UPGRADATION OF INFRASTRUCTURAL FACILITIES IN THE EXISTING POLYTECHNICS - SUBMISSION ON POLYTECHNICS UNDER THE COORDINATED ACTION FOR SKILL DEVELOPMENT PART 1: 1
2
BASIC INFORMATION ABOUT THE POLYTECHNIC
a)
Name of Polytechnic
b) c) d)
Location (Road, Street Locality, City, Pin Code) Year of Establishment Women/Co-educational
e)
Government/ Government Aided
f) a)
Nature of institution Name of Principal / incharge
b)
Office Address with Pin Code
c)
Office Phone No. with STD Code
d)
Residential Phone No. with STD Code Telex/ Fax/ No on which message can be given E-mail address
e) f)
Name,
3
a)
4
a)
Name of Vice Principal/ Deputy incharge Name of Nearest Railway Station
5
a)
Name of Nearest Air Port
Affiliated to Board/ Autonomous
PART II : CURRENT STATUS AND ACADEMIC DIMENSIONS OF THE POLYTECHNIC 1. Courses programmes
and
Sanctioned
Intake
in
various
Information to be filled in Table 1 2.
Faculty Positions and Development Status Information to be filled in Table 2 & 3
3. Books and Learning Resources Utilization Centre (LRUC) Information to be filled in Table 4 Rationale for strengthening LRUCs Information to be filled in Table 5 4.
Existing Laboratories and Workshops Information to be filled in Table 6
5. Rationale for Proposed Modernization of Laboratories and Workshops Information to be filled in Table 7 & 8 6. New Courses/ Programmes to be introduced in this scheme (if any).Details thereof and estimates 7. Estimated Cost for Upgradadtion of Infrastructural facilities
Information to be filled in Table 9
Table – 1
COURSES AND SANCTIONED INTAKE IN VARIOUS PROGRAMMES Sl.No .
Name of the Year of Diploma/ course Starting Post Diploma
Duratio n
Semester / Annual
1.
*The total enrolment of all course for entire duration to be given.
Sanctione Actual Total d student Enrolment all intake Years (1st nd Yr+2 Yr+3rdYr) upto 2008-09* Male Female
Table 2 CURRENT FACULTY STATUS Category
Total posts sanctioned
1 Head of Department Lecturers
2 01 10
Post Filled Regular
Adhoc
Central
Dual charge
Total
Grand Total
M 3
F 4
M 5
F 6
M 7
F 8
M 9
0 1 0 4
--
--
--
--
--
--
F 1 0 --
M 1 1 --
F 1 2 --
0 3
--
--
--
--
--
--
--
--
% filled
13
14
01
100
07
70
TABLE 3 CURRENT SUPPORTING STAFF STATUS Category
Total posts sanctioned
1
2
Lab. Assistant
01 03
Peon
Post Filled Regular
Adhoc
Central
Dual charge
Total
M 3
F 4
M 5
M 7
M 9
M 1 1
0 1 0 1
F 6
F 8
F 1 0
Grand Total
F 1 2
% filled
13
14
--
01
100
--
01
33
Table-4 BOOKS AND LEARNING RESOURCES AVAILABLE CURRENT STATUS (NUMBER) Sr.No .
Type of LRs
Total Numbers
-----------NIL--------------------
Amount Rupees)
(in
Table 5 BOOKS AND LEARNING RESOURCES PROPOSED TO BE PROCURED Sr.No.
1 2 3 4 TOTAL
Type of LRs
Books LR’s Softwares Models
Total Quantity Required 500 100 10 100
Total (Rs. million) 0.15 0.020 0.050 0.10 0.32
cost Procurement schedule with Approx. th in cost(Rupees in lakh) during 11 Plan Upto 31.3.2010 0.50 0.10 0.30 0.50
Year 2010-11 0.50 0.05 0.20 0.30
Year (20112012) 0.50 0.05 -0.20
Table -6 LABORATORIES AND EQUIPMENT AVAILABLE S.No.
1
Laboratory / Workshop
Physics/ Chemistry Lab
List of equipment Availability each costing more documents than Rs. 10,000/manuals Yes No Nil
of Condition In use
Obsolet e
Table -7 NAMES OF LABORATORIES AND WORKSHOPS Name of Existing Laboratories
Workshops
Physics and -Chemistry Lab.
Additional requirement for current and new courses Laboratories Workshops Physics Lab. -Chemistry Lab. (Separate Labs Required Linguistic Skill Development Lab.
Table – 8 Tentative Equipment (+ Furniture) Requirement S.No .
Name of the Course
Name of Laboratory
Total quantity required
Total cost (Rs. in million)
Procurement schedule with Approx. (Rupees in lakh)
cost
Upto 31.03.2010 No. Amt
Year 201011) No
Amt
Year (201112) No. Amt
All
Physics/ Chemistry
100
0.20
50
1.0
30
0.30
20
0.20
All
Linguistic 100 Skill Developmen t Lab.
0.30
50
1.5
30
1.0
20
0.50
1 2
Year of starting the course
Table – 9 ESTIMATED COST FOR INFRASTRUCTURAL DEVELOPMENT
Sl.No. A)
B)
Expenditure Category INVESTMENT COST BOOKS (+ JOURNALS) LRs Sub- Total (A) RECURRING COST Consumables Operation and Maintenance Sub-Total (B) Grand Total (A) + (B)
Allocations sought (Rupees in lakh) Upto 31-03-2010 Year 2010-11
Year 20011-12
0.50 0.80 1.30
0.50 0.55 1.05
0.50 0.25 0.75
0.75 0.90
0.75 0.90
1.00 0.90
1.65 2.95
1.65 2.70
1.90 2.65
FINANCIAL RESOURCES ====================
1
Whether the a) State institution is receiving grants, if so b) Others (Pl details specify) during last 3 years
2006-07 Rec. Non Recurrin g
2007-08 Recurrin Non g Rec.
2008-09 Rec. Non Rec.
Whether the institution received any grants from Central Government / and any other agencies such as Tech. Ed.1, II & III, during the last 15 years, if so given details
Scheme
Total
Year
Amount Received
Amount Spent
Which dare the major areas for Modernization and Strengthening of Polytechnics on priority. Please give a brief write up and list of the areas.
Details:-
a) 1.
Guidelines for justification in respect of: Modernization of Laboratories and Workshops 1. 2. 3. 4. 5. 6.
2.
rational Objectives laboratories to be modernized resources required in terms of equipment, space, furniture consumables, operation and maintenance etc plan of modernization of existing laboratories in phased manner
Learning Resource Utilization Centre (LRUC) 1. 2. 3. 4. 5. 6.
rational Objectives expected impact resources required in terms of equipment, books and consultancy learning resources proposed to acquired during project (provide information in table 6) Financial implications (provide financial information in table_____) *********