Fm Recovery Process

  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Fm Recovery Process as PDF for free.

More details

  • Words: 309
  • Pages: 31
RECOVERY PROCSS FM Mill HF1

HF2

MB1A 262

MB1B 309

ME21-create SCO

ZSCO

ZSCOGR

3

4

5

MB1B 309 Mill Material

2

6

1

1. For recovery Batch number Reversal need to be done through MB1A 262 mvt . 2. Material transferring from for recovery material to constant material with the prime batch. 3. As per request Master Desk will increase the SCO qty 4. ZSCO will be created against the sco number which will send the material to vendor location and create a challan. 5. ZSCOGR will br created against the challan number and stock will transfer from vendor to SRCV. 6. Material will be trasfer to mill material with reqd qty through MB1B 309 mvt. 7. . MB1A/261 mvt GI need to be done for the order.

As per the above diagram with screen shot enclosed for the process.

G A L V Y MB1A 261

7

RECOVERY PROCSS Serial No. Constant ARS Material No

Description

Plant

Category

Intermediate

1

140002313 FM2-Black Arising

055

ARS

100009890

2

140002314 FM2-Galvanised Arising

055

ARS

100009892

3

140002315 HF1-Black Arising

055

ARS

100009893

4

140002316 HF1-Galvanised Arising

055

ARS

100009894

5

140002317 HF2-Black Arising

055

ARS

100009895

6

140002318 HF2-Galvanised Arising

055

ARS

100009896

7

140002341 K&A HF1-Black Arising

055

ARS

100009893

8

140002342 K&A FM2-Black Arising

055

ARS

100009890

9

140002344 K&A CT-HF2-Black Arising

055

ARS

100009895

10

140002345 K&A HF1-Galvanised Arising

055

ARS

100009894

11

140002346 K&A FM2-Galvanised Arising

055

ARS

100009892

12

140002347 K&A CT-HF2-Galvanised Arising 055

ARS

100009896

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

RECOVERY PROCSS

Related Documents

Fm Recovery Process
August 2019 4
Recovery
November 2019 53
Fm
June 2020 24
Fm
October 2019 44
Fm
June 2020 23
Fm
May 2020 20