PROJECT TITLE :PE SEPARATOR PERIMETER BUNDWALL & CANAL BILL OF MATERIALS Item 1 2 3 4 5 6 7 8 9 10

Description CHB #4 CEMENT WHITE SAND GRAVEL ¾ DEFORMED BAR 10mmø x 6M G.I TIE WIRES PLYWOOD ¼"thk x 6M COCO LUMBER 2" x 3" x 8' C.W.N #3 C.W.N #2

Qty Unit

Unit Cost PhP

3000 PC 630 BAG 40 M3 45 M3 800 PC 3 RL 25 PC 50 PC 10 KG 10 KG

Cost PhP 5.5 174 550 650 135 1000 350 105 45 40

16,500.00 109,620.00 22,000.00 29,250.00 108,000.00 3,000.00 8,750.00 5,250.00 450.00 400.00 303,220.00

LABOR 1

LABOR COST

274 LN.M

600 SUB-TOTAL

TOTAL COST COST PER LN.M

Prepared by:

ROLANDO G. SARMIENTO Jr. Supervisor-Eng'g/Mntce

Noted by:

HENRY L. COPAWAY Facilities Manager

164,400.00 303,220.00

467,620.00 1,706.64 187,048.00 280,572.00

IN-HOUSE ESTIMATE PROJECT TITLE : MODIFICATION OF QA/LABORATORY

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1. MATERIALS PREPARATION, HAULING & STAGING 1 1 500 2.FABTN/INSTLN OF TEMP. WALL ALONG INSTRUMENTATION ROOM 4 1 500 3. DEMOLITION WORKS 3 1 500 4HAULING OF RECOVERED DEBRIS 1 1 500 5. INSTALLATION OF WOODEN FRAMING 1 1 500 6. MODIFICATION/ INSTALLATION OF DOOR JAMBS- 3 SETS 2 1 500 7. REPAIR OF AFFECTED CEILING , FLOORING & CHB WALLS 2 1 500 8. PAINTING WORKS ON AFFECTED PORTIONS 2 1 500 9. DISMANTLIN & RE-INSTALLATION OF ELECTRICALS 1 1 500 10. GHK / SITE CLEARING 1 1 500 11 500 12 500 13 500 14 500 TOTAL DURATION 18 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding machine Plainer Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 0 0 500 1 4 150 1 5 100 1 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY

Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : REHABILITATION OF BIKES PARKING ENCLOSURE PR#: Item Scope of Works

# of Skilled Rate per Days Day 1.LAY-OUT 0.5 1 500 2.FABTN/INSTLN OF B.I PIPE FOR STEEL POST & FRAMING 2.5 2 500 3.INSTALLATION OF PURLINS 1 2 500 4.INSTALLATION OF G.I CORRUGATED SHEETS 1.5 2 500 5.FABTN/INST INSTALLATION OF STEEL RAILINGS FOR PARKING 3 1 500 6.PAINTING WORKS 1 1 500 7. SPREADING OF USED BRICKS @ FLOORING 2 1 500 8. GHK/SITE CLEARING 0.5 1 500 9 500 10 500 11 500 12 500 13 500 14 500 TOTAL DURATION 12 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 7 500 1 7 150 1 2 100 1 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : Filterpress platform extension 2ft. width extension PR#: Item Scope of Works

# of Skilled Rate per Days Day 1.PLATFORMS & STAGING 0.5 1 500 2.CUTTING OF CHANNELS FOR MAIN MEMBERS 1 2 500 3.CUTTING OF ANGLE BARS @ EXISTING FILTER PRESS PLATFORM 1 2 500 4.INSTALLATION OF SECONDARY FRAMING 3 2 500 5.INSTALLATION OF CHECKERED PLATE FLOORING 3 2 500 6.INSTALLATION OF BRACING/FULLWELDING 2 2 500 7. PAINTING WORKS 2 2 500 8. GHK/SITE CLEARING 0.5 1 500 9 500 10 500 11 500 12 500 13 500 14 500 TOTAL DURATION 13 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 8 0 500 8 1 150 5 0 100 8 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : Filterpress platform extension 2ft. width extension PR#: Item Scope of Works

# of Skilled Rate per Days Day 1.PLATFORMS & STAGING 0.5 1 500 2.CUTTING OF CHANNELS FOR MAIN MEMBERS 1 2 500 3.CUTTING OF ANGLE BARS @ EXISTING FILTER PRESS PLATFORM 1 2 500 4.INSTALLATION OF SECONDARY FRAMING 3 2 500 5.INSTALLATION OF CHECKERED PLATE FLOORING 3 2 500 6.INSTALLATION OF BRACING/FULLWELDING 2 2 500 7. PAINTING WORKS 2 2 500 8. GHK/SITE CLEARING 0.5 1 500 9 500 10 500 11 500 12 500 13 500 14 500 TOTAL DURATION 13 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 8 0 500 8 1 150 5 0 100 8 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER

Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : MISC.WORKS - ADMIN,SCM,HRM,ISO,ENG'G WHSE (JULY 2007)

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1.FABTN/INSTLN OF CABINET FOR SCM-PURCHASING 2 1 500 2.FABTN/INSTLN OF CABINET FOR ISO OFFICE 2 1 500 3.FABTN/INSTLN OF CABINET FOR ENG'G WHSE OFFICE 2 1 500 4.REPAIR OF CANVASS TENT ALONG SCM-MC WAREHOUSE 1 1 500 5. REPAIR OF GENSET/AIR COMPRESSOR ENCLOSURE STAIRWELL 2 1 500 6. INSTALLATION OF "SSS" NUMBER PLATE ALONG R & F LOCKER FRONTING 0.5 PRI- 1 500 PARKING 500 7 500 8 500 9 500 10 500 11 500 12 500 13 500 TOTAL DURATION 9.5 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Electric Jackhammer Planner Grinding Machine Scaffolding-GONDOLLA

Qty

# of Days Rate per Used Day 0 0 500 0 1 150 0 0 100 0 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

PCW

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : REPAIR OF DAMAGE DRIVEWAY ALONG BATT.FEEDING-RIGHT SIDE

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1. MATERIALS,EQUIPMENT PREPARATION 0.25 1 500 2. LAYOUT 0.25 1 500 3. BREAKING OF ASPHALT,CONCRETE PAVEMENT USING PRI-JACKHAMMER3 2 500 4. EXCAVATION 2.5 2 500 5. HAULING OF ASPHALT & CONCRETE DEBRIS 1 1 500 5. FABTN/INSTLN OF REBARS/FORMWORKS 0.5 2 500 6. COMPACTION/GRAVEL BEDDING 1 2 500 7. CONCRETING WORKS USING READYMIX 1 2 500 8. SITE CLEARING/GHK 0.5 1 500 9 500 10 500 11 500 12 500 13 500 TOTAL DURATION 10 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Electric Jackhammer Planner Grinding Machine Scaffolding-GONDOLLA

Qty

# of Days Rate per Used Day 0 0 500 0 1 150 0 0 100 0 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : REPAINTING OF SIDINGS ALONG BLAST BH CANOPY

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1.DISMANTLING OF END FLASHING 1 2 500 2.INSTALLATION OF PLATFORM (GONDOLLA TYPE) 0.5 2 500 3.CLEANING OF SIDINGS SURFACE 1 1 500 4. PAINTING OF SIDINGS USING SOMAR BEIGE 2 2 500 5. INSTALLATION OF NEW END FLASHING W/ CRYSTAL BLUE IN COLOR 1 1 500 6. DISMANTLING OF GONDOLLA PLATFORMS 0.5 2 500 7. SITE CLEARING/GHK 0.5 1 500 8 500 9 500 10 500 11 500 12 500 13 500 14 500 TOTAL DURATION 6.5 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Electric Jackhammer Planner Grinding Machine Scaffolding-GONDOLLA

Qty

# of Days Rate per Used Day 0 0 500 7 1 150 0 0 100 6 4 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : MEETING ROOM FOR ADMIN.PRODUCTION OFFICE

PR#:

Item Scope of Works 1. 2. 4. 5. 6. 7 9 10 11 12 13 14 15 16

# of Skilled Rate per Days Day LAY-OUT 0.5 1 500 REMOVAL OF EXISTING WOODEN PARTITION 1 1 500 INSTALLATION OF WOODEN FRAMING 1.5 1 500 INSTALLATION OF PLYWOOD 1 1 500 INSTALLATION OF DOOR 1 1 500 INSTALLATION OF CEILING CORNICE 0.5 1 500 PAINTING WORKS 2 1 500 GHK/SITE CLEARING 0.5 1 500 500 500 500 500 500 500 TOTAL DURATION 8 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Electric Jackhammer Planner Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 0 0 500 7 1 150 0 0 100 0 0 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : MODIFICATION OF ADMIN.PRODUCTION OFFICE

PR#:

Item Scope of Works 1. 2. 3. 4. 5. 6. 7 8 9 10 11 12 13 14 15 16

# of Skilled Rate per Days Day LAY-OUT 0.5 1 500 REMOVAL OF EXISTING WOODEN PARTITION 1 1 500 MODIFICATION OF ENTRANCE DOOR - RELOCATION 2 1 500 INSTALLATION OF WOODEN FRAMING 2 2 500 INSTALLATION OF PLYWOOD 1 2 500 INSTALLATION OF DOORS,JAMBS & WINDOWS 2 2 500 INSTALLATION OF CEILING CORNICE 1 1 500 MODIFICATION OF ALUMINUM WINDOW ALONG AVP-SUPPORT AREA 2 1 500 PAINTING WORKS 2.5 1 500 GHK/SITE CLEARING 0.5 1 500 500 500 500 500 500 500 TOTAL DURATION 14.5 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Electric Jackhammer Planner Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 0 0 500 7 1 150 0 0 100 0 0 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : REPAIR OF PERIMETER FENCE-PILOT NEAR SLAGPIT2 LABOR COST

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1. LAY-OUT 0.25 1 500 2. MATERIALS PREPARATION 0.5 1 500 3.REMOVAL OF DAMAGE CORRIGATED SHEET,FENCE & FRAMING 1 1 500 4. PAINTING WORKS 1 1 500 5. INSTALLATION OF NEW CORRUGATED FENCE 1 1 500 6. GHK/SITE CLEARING 0.5 1 500 7 500 8 500 9 500 10. 500 11. 500 12. 500 13. 500 14. 500 15. 500 TOTAL DURATION 4.25 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 5 300 1 5 150 1 5 100 2 5 100

EQUIPMENT COST

LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER

Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : RENOVATION OF PRI-BOARDROOM

PR#:

Item Scope of Works 1. 2. 3. 4. 5. 6. 7 8 9 10 11 12 13 14 15 16

# of Skilled Rate per Days Day PREPARATION OF AREA / CLEARING WORKS 1 2 500 DEMOLITION OF EXISTING WALL 3 2 500 HAULING OF DEBRIS 1 1 500 WOOD SANDING 1 2 500 HAULING OF MATERIALS 2 1 500 LAYOUT 0.5 1 500 CONSTRUCTION OF WOODEN PARTITION-JUT/AVT 5 2 500 CONSTRUCTION OF MASONRY WALL-BOARDROOM 6 2 500 REPAIR OF CEILING 4 2 500 DOORS & WINDOWS JAMB 2 2 500 RELOCATION OF AIRCON 2 1 500 INSTALLATION OF TILES /CUTTING/CEMENT GROUTING 6 2 500 PAINTING WORKS 3 2 500 500 500 500 TOTAL DURATION 36.5 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3.

EQUIPMENT Electric Jackhammer Planner Grinding Machine

Qty

# of Days Rate per Used Day 1 3 500 1 6 150 1 6 100

4.

Scaffolding

2

3

100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER

Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : LANDSCAPPING OF WALL @BLAST SCRUBBER

PR#:

OPTION II - SLAG CHB W/ REINFORCED COLUMN/FOOTING Item Scope of Works 1. 2. 3. 4. 5. 6. 7 8 9 10. 11. 12. 13. 14. 15.

# of Skilled Rate per Days Day LAY-OUT 0.5 1 500 FABTN/INSTLN OF CONCRETE PRECAST MOULDING FOR PLANTS 2.5 1 500 FABTN/INSTLN OF CONCRETE PRECAST MOULDING -FOUNTAIN 2.5 1 500 PLASTERING WORKS 2 1 500 PAINTING WORKS 3 1 500 PLANTING WORKS 1 1 500 SITE CLEARING / GHK 0.5 1 500 500 500 500 500 500 500 500 500 TOTAL DURATION 12 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item

EQUIPMENT

Qty

# of Days Rate per Used Day

1. 2. 3. 4.

Welding Machine Cutting Machine Grinding Machine Scaffolding

4 4 4 3

300 150 100 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : CONSTRUCTION OF RETAINING WALL BET SLAGPIT2 & WTP2

PR#:

OPTION II - SLAG CHB W/ REINFORCED COLUMN/FOOTING Item Scope of Works 1. 2. 3. 4. 5. 6. 7 8 9 10. 11. 12. 13. 14. 15.

EXCAVATION REINFORCEMENT CONCRETING WORKS FORMWORKS SLAG CHB LAYING PLASTERING

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

# of Skilled Rate per Days Day 8 1 500 6 3 500 4 2 500 4 2 500 7 2 500 4 2 500 500 500 500 500 500 500 500 500 500 TOTAL DURATION 33 DAYS Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 4 300 4 150 4 100 3 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE : SAFETY BARRIER FOR SMELTING WALL CHAMBER FRONTING DRIER LABOR COST

PR#:

Item Scope of Works

# of Skilled Rate per Days Day 1. LAY-OUT 0.25 1 500 2. CUTTING OF MS PLATE & B.I PIPES 0.5 2 500 3. REPAIR OF DAMAGE PAVEMENT OF RC WALLS 3 2 500 4. INSTALLATION OF MS PLATE W/ EXPANSION BOLT 7 FULLWELDING 3 2 500 5. BREAKING OF CONCRETE PAVEMENT 3 1 500 6. INSTALLATION OF PIPE BARRICADE 3 2 500 7. PAINTING WORKS (LEMON YELOW W/ BLACK STRIPES) 2 1 500 8. GHK/SITE CLEARING 0.5 1 500 9. 500 10. 500 11. 500 12. 500 13. 500 14. 500 15. 500 TOTAL DURATION 15.25 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision

% mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 12 300 1 12 150 1 12 100 2 7 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER

Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE :FABTN/INSTLN OF BOXSTRUTT SME-PRODTN BLDG PR#: LABOR COST Item Scope of Works

# of Skilled Rate per Days Day 1. LAY-OUT/CUTTING OF MS ANGLE BARS 0.25 1 500 2. FABRICATION OF 4-SETS BOX STRUTT 3 2 500 3. INSTALLATION OF 4-SETS OF BOXSTRUTT 3 2 500 4. REMOVAL OF EXISTING 2-UNITS BOXSTRUTT OF REC.PRODTN BLDG 1 2 500 5. PAINTING WORKS 2 1 500 6. GHK/SITE CLEARING 0.5 2 500 7 500 8 500 9. 500 10. 500 11. 500 12. 500 13. 500 14. 500 15. 500 TOTAL DURATION 9.75 DAYS

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT

Qty

Welding Machine Cutting Machine Grinding Machine Scaffolding

# of Days Rate per Used Day 1 5 300 1 5 150 1 5 100 2 8 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE :REHABTN.OF PILOT STAFFHOUSE 2ND FLR RM2 LABOR COST Item Scope of Works 1. MATERIALS/TOOLS PREPARATION 2. PLATFORMS & STAGING 3. REMOVAL OF ENTIRE CEILING PANELS 4. HAULING OF RECOVERED DEBRIS 5. INSTALLATION OF CEILING JOIST & HANGER 6. INSTALLATION OF NEW CEILING 7. REPAIR OF WOODEN PARTITIONS 8. PAINTING WORKS 9. GHK / SITE CLEARING 10. 11. 12. 13.

PR#:

# of Skilled Rate per Days Day 0.25 1 500 0.25 1 500 1 1 500 1 1 500 2 1 500 2 1 500 1 1 500 2 1 500 0.5 1 500 500 500 500 500

14. 15.

500 500 TOTAL DURATION

10 DAYS

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT

Qty

Welding Machine Cutting Machine Grinding Machine Scaffolding

# of Days Rate per Used Day 300 150 100 2 6 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE :FABTN/INSTLN OF SAFETY BARRIER @ PRODTNSME2 BLDG LABOR COST Item Scope of Works 1. LAY-OUT/CUTTING OF MS PLATE 2. INSTALLATION OF CUT MS PLATES 3. FULLWELDING 4. APPLICATION OF RUST CONVERTER & PRIMER 5. FINAL COAT USING LEMON YELLOW W/ BLACK STRIPES 6. GHK/SITE CLEARING 7 8 9

PR#:

# of Skilled Rate per Days Day 1 2 500 4 2 500 0.5 2 500 1 1 500 2 1 500 0.5 1 500 500 500 500

10. 11. 12. 13. 14. 15.

500 500 500 500 500 500 TOTAL DURATION

9 DAYS

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT

Qty

Welding Machine Cutting Machine Grinding Machine Scaffolding

# of Days Rate per Used Day 1 5 300 1 5 150 1 5 100 2 5 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE REPLACEMENT OF ROOF-SME.PRDTN DRIER BH AREA LABOR COST Item Scope of Works 1. HAULING OF LONG SPAN ROOFING 2. DISMANTLING OF DAMAGED ROOFING & PURLINS 3. INSTALLATION OF NEW PURLINS 4. PAINTING WORKS 5. INSTALLATION OF LONG SPAN ROOFING, RIDGEROLL & FLASHING

PR#:

# of Skilled Rate per Days Day 1 1 500 1 2 500 1 2 500 1 2 500 1 2 500

6. GHK/SITE CLEARING 7 8 9 10. 11. 12. 13. 14. 15.

0.5

TOTAL DURATION

1

500 500 500 500 500 500 500 500 500 500

5.5 DAYS

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 3 300 1 3 150 1 3 100 3 3 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE STRENGTHENING OF WWTF BLDG COLUMNS-9 UNITS LABOR COST Item Scope of Works

PR#:

# of Skilled Rate per Days Day 1. INSTALL ADDITIONAL STIFFENER PLATE @ WEB & FLANGE MEMBERS 4 2 500

@ BOTTOM PART OF DETERIORATED COLUMN 2. INSTALLATION OF FORMWORKS 3. CONCRETING WORKS INCLUDING PLASTERING 4. PAINTING WORKS W/ STRIPES LEMON YELLOW 5. GHK/SITE CLEARING 7 8 9 10. 11. 12. 13. 14. 15.

2 4 2 0.5

TOTAL DURATION

500 500 500 500 500 500 500 500 500 500 500 500 500 500

2 2 1 1

12.5 DAYS

Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 8 300 1 8 150 1 8 100 2 3 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

IN-HOUSE ESTIMATE PROJECT TITLE FABTN/INSTLN OF SAFETY BARRIER @ PRODTNSME2 BLDG

PR#:

LABOR COST Item Scope of Works

# of Skilled Rate per Days Day 1. LAY-OUT/CUTTING OF MS PLATE 1 1 500 2. INSTALLATION OF CUT MS PLATES 2 2 500 3. FULLWELDING 1 2 500 4. APPLICATION OF RUST CONVERTER & PRIMER 1 2 500 5. FINAL COAT USING LEMON YELLOW W/ BLACK STRIPES 1 2 500 6. GHK/SITE CLEARING 0.5 1 500 7 500 8 500 9 500 10. 500 11. 500 12. 500 13. 500 14. 500 15. 500 TOTAL DURATION 6.5 DAYS Skilled @ Php 500.00/day Unskilled @ Php 300.00/day

Sub Total % Supervision % mark-up % VAT

EQUIPMENT RENTAL Item 1. 2. 3. 4.

EQUIPMENT Welding Machine Cutting Machine Grinding Machine Scaffolding

Qty

# of Days Rate per Used Day 1 4 300 1 4 150 1 4 100 2 3 100

EQUIPMENT COST LABOR COST MATERIAL COST

TOTAL PROJECT COSTPhp Prepared by:

_______ PCW PLANNER Noted by:

HENRY L. COPAWAY Facilities Manager

Unskilled Rate per Cost Day 3 300 3 300 3 300 3 300 2 300 2 300 2 300 2 300 1 300 3 300 300 300 300 300

Php Php Php Php

1400 5600 4200 1400 1100 2200 2200 2200 800 1400 0 0 0 0

22,500.00 3,375.00 2,250.00 2,700.00

Cost 0 600 500 400 Php Php Php

1,500.00 30,825.00

32,325.00

12.86 81 13.5

Unskilled Rate per Cost Day 2 300 4 300 4 300 4 300 2 300 2 300 4 300 4 300 300 300 300 300 300 300

Php Php Php Php

550 5500 2200 3300 3300 1100 3400 850 0 0 0 0 0 0

20,200.00 3,030.00 2,020.00 2,424.00

Cost 3500 1050 200 400 Php Php Php

5,150.00 27,674.00

32,824.00

1100579515 Unskilled Rate per Cost Day 4 300 4 300 4 300 4 300 4 300 4 300 4 300 4 300 300 300 300 300 300 300

Php Php Php Php

850 2200 2200 6600 6600 4400 4400 850 0 0 0 0 0 0

28,100.00 4,215.00 2,810.00 3,372.00

Cost 0 1200 0 3200 Php Php Php

4,400.00 38,497.00

42,897.00

1100579515 Unskilled Rate per Cost Day 4 300 4 300 4 300 4 300 4 300 4 300 4 300 4 300 300 300 300 300 300 300

Php Php Php Php

850 2200 2200 6600 6600 4400 4400 850 0 0 0 0 0 0

28,100.00 4,215.00 2,810.00 3,372.00

Cost 0 1200 0 3200 Php Php Php

4,400.00 38,497.00

42,897.00

Unskilled Rate per Cost Day 1 300 1 300 2 300 2 300 2 300 1 300 4 300 6 300 4 300 300 300 300 300 300

Php Php Php Php

1600 1600 2200 1100 2200 400 0 0 0 0 0 0 0 0

9,100.00 1,365.00 910.00 1,092.00

Cost 0 0 0 0 Php Php Php

12,467.00

12,467.00

Unskilled Rate per Cost Day 4 300 2 300 4 300 4 300 6 300 4 300 4 300 6 300 4 300 300 300 300 300 300

Php Php Php Php

425 275 6600 5500 2300 1100 2200 2800 850 0 0 0 0 0

22,050.00 3,307.50 2,205.00 2,646.00

Cost 0 0 0 0 Php Php Php

30,208.50

30,208.50

Unskilled Rate per Cost Day 4 300 4 300 6 300 4 300 2 300 4 300 4 300 300 300 300 300 300 300 300

Php Php Php Php

2200 1100 2300 4400 1100 1100 850 0 0 0 0 0 0 0

13,050.00 1,957.50 1,305.00 1,566.00

Cost 0 1050 0 2400 Php Php Php

3,450.00 17,878.50

21,328.50

Unskilled Rate per Cost Day 2 300 2 300 2 300 2 300 2 300 2 300 2 300 3 300 300 300 300 300 300 300

Php Php Php Php

550 1100 1650 1100 1100 550 2200 700 0 0 0 0 0 0

8,950.00 1,342.50 895.00 1,074.00

Cost 0 1050 0 0 Php Php Php

1,050.00 12,261.50

13,311.50

Unskilled Rate per Cost Day 2 300 2 300 3 300 3 300 3 300 3 300 2 300 2 300 2 300 3 300 300 300 300 300 300 300

Php Php Php Php

550 1100 2800 3800 1900 3800 1100 2200 2750 700 0 0 0 0 0 0

20,700.00 3,105.00 2,070.00 2,484.00

Cost 0 1050 0 0 Php Php Php

1,050.00 28,359.00

29,409.00

Unskilled Rate per Cost Day 3 300 3 300 3 300 3 300 3 300 3 300 300 300 300 300 300 300 300 300 300

Php Php Php Php

350 700 1400 1400 1400 700 0 0 0 0 0 0 0 0 0

5,950.00 892.50 595.00 714.00

Cost 1500 750 500 1000 Php

3,750.00

8,151.50

Php Php

11,901.50

Unskilled Rate per Cost Day 4 300 4 300 6 300 4 300 6 300 4 300 4 300 4 300 4 300 4 300 2 300 4 300 4 300 300 300 300

Php Php Php Php

2200 6600 2300 2200 4600 850 11000 13200 8800 4400 2200 13200 6600 0 0 0

78,150.00 11,722.50 7,815.00 9,378.00

Cost 1500 900 600

600

3,600.00 107,065.50

Php Php Php

110,665.50

Unskilled Rate per Cost Day 4 300 4 300 4 300 4 300 4 300 4 300 4 300 300 300 300 300 300 300 300 300

Php Php Php Php

850 4250 4250 3400 5100 1700 850 0 0 0 0 0 0 0 0

20,400.00 3,060.00 2,040.00 2,448.00

Cost

0 0 0 0 Php Php Php

27,948.00

27,948.00

Unskilled Rate per Cost Day 8 300 6 300 10 300 8 300 4 300 4 300 300 300 300 300 300 300 300 300 300

Php Php Php Php

23200 19800 16000 13600 15400 8800 0 0 0 0 0 0 0 0 0

96,800.00 14,520.00 9,680.00 11,616.00

Cost 0 0 0 0 Php Php Php

132,616.00

132,616.00

1100570746 Unskilled Rate per Cost Day 2 300 4 300 4 300 4 300 4 300 2 300 3 300 4 300 300 300 300 300 300 300 300

Php Php

275 1100 6600 6600 5100 4800 2800 850 0 0 0 0 0 0 0

28,125.00 4,218.75

Php Php

2,812.50 3,375.00

Cost 3600 1800 1200 1400 Php Php Php

8,000.00 38,531.25

46,531.25

1100569998 Unskilled Rate per Cost Day 2 300 4 300 4 300 4 300 2 300 2 300 300 300 300 300 300 300 300 300 300

275 6600 6600 2200 2200 800 0 0 0 0 0 0 0 0 0

Php Php Php Php

18,675.00 2,801.25 1,867.50 2,241.00

Cost 1500 750 500 1600 Php Php Php

4,350.00 25,584.75

29,934.75

1100567332 Unskilled Rate per Cost Day 2 300 2 300 3 300 4 300 2 300 2 300 2 300 2 300 4 300 300 300 300 300

275 275 1400 1700 2200 2200 1100 2200 850 0 0 0 0

300 300

Php Php Php Php

0 0

12,200.00 1,830.00 1,220.00 1,464.00

Cost 0 0 0 1200 Php Php Php

1,200.00 16,714.00

17,914.00

1100570745 Unskilled Rate per Cost Day 4 300 4 300 4 300 4 300 4 300 2 300 300 300 300

2200 8800 1100 1700 3400 550 0 0 0

300 300 300 300 300 300

Php Php Php Php

0 0 0 0 0 0

17,750.00 2,662.50 1,775.00 2,130.00

Cost 1500 750 500 1000 Php Php Php

3,750.00 24,317.50

28,067.50

1100567340 Unskilled Rate per Cost Day 6 300 6 300 6 300 4 300 6 300

2300 2800 2800 2200 2800

4

300 300 300 300 300 300 300 300 300 300

Php Php Php Php

850 0 0 0 0 0 0 0 0 0

13,750.00 2,062.50 1,375.00 1,650.00

Cost 900 450 300 900 Php Php Php

2,550.00 18,837.50

21,387.50

1100565690 Unskilled Rate per Cost Day 4 300

8800

4 4 2 4

300 300 300 300 300 300 300 300 300 300 300 300 300 300

Php Php Php Php

0 4400 8800 2200 850 0 0 0 0 0 0 0 0 0

25,050.00 3,757.50 2,505.00 3,006.00

Cost 2400 1200 800 600 Php Php Php

5,000.00 34,318.50

39,318.50

1100570745

Unskilled Rate per Cost Day 4 300 4 300 4 300 4 300 4 300 4 300 300 300 300 300 300 300 300 300 300

Php Php Php Php

1700 4400 2200 2200 2200 850 0 0 0 0 0 0 0 0 0

13,550.00 2,032.50 1,355.00 1,626.00

Cost 1200 600 400 600 Php Php Php

2,800.00 18,563.50

21,363.50

Related Documents

Flood Control Estimate
November 2019 4
Values Flood Control E
November 2019 15
Estimate
November 2019 38
Estimate
November 2019 29
Estimate
July 2020 20
Estimate
June 2020 17