Field Office Report Apr 09

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Field Office Report Apr 09 as PDF for free.

More details

  • Words: 211
  • Pages: 1
FIELD OFFICE REPORT January 13 through March 13, 2009 2008 Farm Bill: Floodplain Easement program (develop packets, rank app, signatures) 12 applications – coordinated 6 DC’s across 3 states (Indiana – 6 St. Joseph, 1 LaPorte, 1 Warren, 2 Posey; Illinois – 1 Salines; Tennessee – 1 Perry) Environmental Quality Incentive program 5 applications – grazing, hay, animal waste storage facility, 2 for strip-till Construction meeting and layout for waste lagoons (Gamble) Wetlands Reserve Program 2 applications Seed mix info and contract for planting at Pokagon site (425 acres) Inspection of Water Control Structure (Wolfe) Survey at north ditch plug site (Pokagon) – Tech Team Site visit and ranking of application (Somers) 2 status reviews done (Pokagon, Wolfe) Conservation Reserve Program 6 applications (2 grassed waterways, 1 windbreak, 3 filter strips) Wildlife Habitat Incentive Program 2 applications Field visit to determine eligibility (Martinczak) Plan development (Ols) Conservation planning – 2 pasture renovation plans (Stuber, Martin) Develop Intensive Grazing Plan (Morey) Wetlands – 4 determinations Mitigation meeting (Newton) Field visit for wetland enhancement Newsletter mailings Audit – 2 contracts audited for 2009 Comments and questions on 2009 Wetland Reserve program to programs Staff NRCS Recruiting Questionnaire Tree Sales activities Meetings: Farm Bill Training NRCS Teleconference (2)

Area meeting Accomplishment Task Force (Deb)

Related Documents

Field Report
November 2019 41
Field Report
November 2019 75
Apr.09
May 2020 12