Format No : TPKTI/JBF/SITE -03
FIELD CHANGE NOTICE Owner:
Date:
J BF Petroc hemicals Limited
Technip Project No.:
Area I Job details :
0830
Ref. No.: 0830/ FCN/
Contractor Job No.: 1 . SUBJECT:
2. REASON FOR CHANGES :
0 Alternate action already taken due to Hold in drawing 0 Owners request 0 Wrong shipment or fabrication by vendor 0 P & ID Field Change Follow-up 0 Obstructed with adjacent foundation I structure due to overlapping 0 Constructability related change notice 0 Wrong Construct ion I installation at site 0 Any Others - Refer enclosed note 3. CONSTRUCT ION STAT US:
0 0 0
Before Fabrication
0
Before Installation
After Fabrication Under Fabrication
0 0
After Installation Under Installation
4. Revised IFC Drawing Required - YES/NO As Build to be Done by
(name of Contractor)
-
I
NO
5. DESCRIPTION OF CHANGES :
6.ATTACHMENT:
7.
SIGNATURE (Sign/Name/Date) :
INITIATED By I PROPOSED(TP)
CHECKED & VALIDATED By (T P)
APPROVED BY (JBF)