EXPEDIENTE DE POZO AGUA FRIA-

DESCRIPCION

DESCRIPCION

ANTECEDENTES

30

BASE DE USUARIO PARA EL TAPONAMIENTO

2

BASE DE USUARIO (LOCALIZACION)

31

PROGRAMA DE TAPONAMIENTO

3

OFICIO DE LOCALIZACION

32

OFICIO DE INICIO Y/O FIN DE TAPONAMIENTO

4

PROGRAMA DE PERFORACION

33

REPORTE OPERATIVO TAPONAMIENTO

5

MEMORIA DESCRIPTIVA PARA LA PERFORACIÓN DEL POZO

34

ESTADO MECANICO DEL TAPONAMIENTO

6

PERMISO DE PERFORACION (SENER)

35

DISEÑO DEL SISTEMA ARTIFICIAL

7

OFICIO DE INICIO DE PERFORACION

36

PROGRAMA DE LA REPARACION MENOR

8

VERIFICACION TOPOGRAFICA DEL POZO

37

SEGUIMIENTO OPERATIVO DE LA REPARACION MENOR

9

SEGUIMIENTO OPERATIVO DE LA PERFORACION

38

REPORTE DIARIO DE OPERACIONES REPARACION MENOR

10

REPORTE DIARIO DE OPERACIONES PERFORACION

39

ESTADO MECANICO DE LA REPARACION MENOR

11 MANIFESTACION DE HIDROCARBUROS

40

TOMA DE INFORMACION

12 DESCRIPCION DE NUCLEOS

41

ANALISIS DE FLUIDOS

13 REGISTROS ELECTRICOS EVALUADOS

42

PRUEBA DE PRODUCCION

43

ANALISIS PVT

44

REPORTE DE PRUEBAS DE FORMACION

BASES DE USUARIO PARA LA TERMINACION DEL POZO

15 PROGRAMA DE TERMINACION 16

SEGUIMIENTO OPERATIVO DE LA TERMINACION

45

DIAGRAMA STIFF DE ANALISIS DE AGUA

17

REPORTE DIARIO DE OPERACIONES TERMINACION

46

PRESIONES DE FONDOS

18 DISEÑO DEL FRACTURAMIENTO

47

INFORMES ESPECIALES

19 REPORTE DE LA FRACTURA

48

DOCUMENTOS ASOCIADOS A LA PRODUCCION

20 REPORTE DEL FLUJO FINAL

49

PRUEBAS DE INYECTABILIDAD

21 SURVEY FINAL

50

INFORMES Y ESTUDIOS DE YACIMIENTOS

22 OFICIO DE LA TERMINACION DEL POZO

51

ANALISIS DE ACEITE

23 ESTADO MECANICO FINAL

52

ANALISIS CROMATOGRAFICOS

BASES DE USUARIO PARA LA REPARACION MAYOR

53

EVALUACION PETROFISICA (IMAGEN)

MEMORIA DESCRIPTIVA PARA 25 EL PERMISO DE LA REPARACION MAYOR (SENER)

54

COLUMNA GEOLOGICA

26

SEGUIMIENTO OPERATIVO DE LA REPARACION MAYOR

55

CORRESPONDENCIA GENERAL

27

REPORTE DIARIO DE OPERACIONES REPARACION MAYOR

28

OFICIO DE LA TERMINACION DE LA REPARACIÓN MAYOR

29

ESTADO MECANICO DE LA REPARACION MAYOR

24

OK

OPERACIONES

TERMINACIÓN

No.

1

14

REPARACIÓN MAYOR

OK

REPARACIÓN MENOR

PERFORACIÓN

No.

TAPONAMIENTO

TRABAJOS PREVIOS A LA PERFORACIÓN

INDICE DE EXPEDIENTE DE POZO

PROGRAMA DE PERFORACION

MEMORIA DESCRIPTIVA PARA LA PERFORACION DEL POZO

PERMISO DE PERFORACION (SENER)

OFICIO DE INICIO DE PERFORACION

SEGUIMIENTO OPERATIVO DE LA PERFORACION

REPORTE DIARIO DE OPERACIONES ‐ PERFORACION

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

30/05/2005 6:53:13

DIVISION NORTE U. O. POZA RICA

Page 102 of 149

29/05/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 286 286 Marca 24:00 504 376 Serie 05:00 504 376 Diametro Ava/Ind 218 /254.65 Tipo Ult.Cont Toberas Prox.Co Mts. Perf. Litologi Hrs. Op. Prom x m 3 Ult. Mts. Costo x m Amp. Inic. Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 10 3/4 99-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 7 5/8 500B.L Prog--> 504 357.1 376.26 43° 51' SW 0°0' Emp. Real--> C2 489 354.21 365.38 43° 51' SW 0°0' Lodo BENTONITICO 473 351.42 353.95 45° 30' SW 89°42' Dens: 1.3 Visc: 62 Temp °C: %Arena: Filtrado: Calcio: Enjarre: Alc: Gel 0: Pruebas de Formacion Materiales Gel 10: Cloruros: PH: %Solidos: %Aceite: %Agua: VA: VP: YP: Emul: Prub.Gote gr/cm3 a R.A.A: MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior METIO Y CEMENTO TR 10 3/4"; CON BNA. PDC DE 9½" PERFORA DIRECCIONAL DE 99/286 M; ULT. 3 M. (2'-2'-3'). Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-5:00 CON BNA. PDC DE 9½" PERFORA DIRECCIONAL DE 286/378 M; ULT. 3 M. (3'-4'-4'). . PERFORACION 1.98 5:00-5:15 EFECTUO MANTENIMIENTO AL EQUIPO DE PERFORACION (TOP DRIVE Y MOTOR DEL MALACATE). . Total de Dias 2.08 5:15-14:15 14:15-15:30 15:30-18:30 18:30-18:45 18:45-22:30 22:30-23:00 23:00-23:30 23:30-24:00 0:00-2:30

CON BNA. PDC DE 9½" PERFORA DIRECCIONAL DE 378/504 M; ULT. 3 M. (1'-2'-6'). . CIRCULO POZO. . SACO BARRENA Y BHA DIRECCIONAL A SUPERFICIE. . REALIZO PLATICA DE SEGURIDAD PARA TOMAR REGISTROS. . TOMO REGISTROS BHC-DIL-RG DESDE 504 MTS HASTA 100 MTS. . DESMANTELO EQUIPO URE. . CIAS. DE SERVICIO REALIZO PLATICA DE SEGURIDAD PARA METER TR 7 5/8". . ARMO ZAPATA + 1 TRAMO TR 7 5/8" + COPLE FLOTADOR Y PROBO TR 7 5/8"; METIO TR 7 5/8" HASTA 30 MTS. Total de Esperas METIO TR 7 5/8" J-55 DE 26.4 LBS/FT, BCN HASTA 504 MTS; LLENO CADA 5 TRAMOS; DISTRIBUCION DE LA TR 7 5/8": D E 0/5.65 M, E.M.R; DE 5.65/490.37 M, 36 TRMOS DE R 7 5/8" J-55 DE 26.4 LBS/FT, BCN; DE 490.37/490.77 M, COPLE FLOT ADOR; DE 490.77/504.24 M, 1 TRAMO DE TR 7 5/8"; DE 504.24/504.50 M, ZAPATA GUIA.

0.01 0.01

2:30-4:15 DESMANTELO EQUIPO PARA METER TR 7 5/8". . 4:15-5:00 CIRCULANDO POZO MIENTRAS ARMA LINEAS Y EQUIPO DE CEMENTACION. .

Compntes. y Eq. Aux

Resumen: C/BNA. PDC DE 9½" PERFOR A 504 M; TOMO REGISTROS BHC-DIL-RG ; METE TR 7 5/8" HASTA 30 M. Sig. Oper: CEMENTAR TR 7 5/8" J-55 DE 26.4 LBS/FT, BCN. Programa: PROBAR TR 7 5/8"; C/BNA. PDC DE 6 3/4" PERFORAR DIRECCIONAL HASTA 2107 M; TOMAR Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

31/05/2005 6:53:20

DIVISION NORTE U. O. POZA RICA

Page 103 of 150

30/05/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 504 376 BAKER Marca 24:00 649 557 7300701 Serie 05:00 800 663 6 3/4 Diametro Ava/Ind 145 /217.85 PDC Tipo -10-10-10-10-1 Ult.Cont Toberas 296 Prox.Co Mts. Perf. 10 Litologi Hrs. Op. Prom x m 2.03 3 Ult. Mts. 1-1-1 0 Costo x m Amp. Inic. 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 7 5/8 504-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 5 1/2 2107-P.T B.L Prog--> 649 269.86 556.56 44° 54' SW 86°48' Emp. Real--> C2 636 260.68 547.35 44° 54' SW 86°46' Lodo EMULSION INVERSA 607 240 527.02 46° 4' SW 87°50' Dens: 1.35 Visc: 62 Temp °C: %Arena: Filtrado: 4 Calcio: Enjarre: 1 Alc: Gel Pruebas de Formacion Materiales 0: 16 Gel 10: 25 Cloruros: 33000 PH: %Solidos: 24 %Aceite: 62 %Agua: 14 Prub.Gote gr/cm3 a VA: 31 VP: 21 YP: 10 Emul: 500 R.A.A: 82/18 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior C/BNA. PDC DE 9½" PERFOR A 504 M; TOMO REGISTROS BHC-DIL-RG ; METE TR 7 5/8" HASTA 30 M. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-2:30 METIO TR 7 5/8" J-55 DE 26.4 LBS/FT, BCN HASTA 504 MTS; LLENO CADA 5 TRAMOS; DISTRIBUCION DE LA TR 7 5/8": D PERFORACION 2.98 E 0/5.65 M, E.M.R; DE 5.65/490.37 M, 36 TRMOS DE R 7 5/8" J-55 DE 26.4 LBS/FT, BCN; DE 490.37/490.77 M, COPLE FLOT Total de Dias 3.08 ADOR; DE 490.77/504.24 M, 1 TRAMO DE TR 7 5/8"; DE 504.24/504.50 M, ZAPATA GUIA.

2:30-4:15 4:15-5:30 5:30-6:00 6:00-7:45

DESMANTELO EQUIPO PARA METER TR 7 5/8". . CIRCULO POZO MIENTRAS ARMA LINEAS Y EQUIPO DE CEMENTACION. . EFECTUO PLATICAS DE SEGURIDAD; PROBO LINEAS CON 3000 PSI; OK. . CEMENTO TR DE 7 5/8" DE LA SIGUIENTE MANERA; BOMBEO 20 BLS DE CW7 + 80 BLS DE LECHADA DE 1.94 GR/CC A 4 BPM. DESPLAZO CON 76.5 BLS DE LODO EMULSION INVERSA DE 1.35 GR/CC; ASENTO TAPON CON 1500 PSI; DESF OGO PRESION Y RETORNO 1 BLS A TANQUES. CIAS. DE SERVICIO

7:45-8:00 8:00-8:30 8:30-9:45 9:45-12:00

DESMANTELO CABEZAL DE CEMENTACIONES Y LINEAS. . CORTO TR DE 10 3/4" Y ELIMINO CABEZAL DE CEMENTACIONES. . INSTALO CABEZAL DE 11" X 7 5/8" X 5000 PSI; SLIP LOCK Y PROBO SELLOS CON 5000 PSI, OK. INSTALO CONJUNTO DE PREVENTORES Y PROBO CONEXION 11" X 5000 PSI + HERMETICIDAD DE LA TR 7 5/8" CONT RA PREVENTORES CIEGOS CON 2000 PSI, OK; TEST DE PRESION EN CHOKE MANIFOLD CON 300 PSI X 5 MIN + 2000 PSI X 10 MIN, OK. .

12:00-12:15 12:15-14:15 14:15-14:30 14:30-15:45 15:45-16:30 16:30-17:15 17:15-17:30 17:30-17:45 17:45-18:15 18:15-18:30 18:30-19:15

PLATICAS DE SEGURIDAD Y ARMO BHA. . INSTALO BNA. 6 3/4" Y ARMO METIO APAREJO DE FONDO DIRECCIONAL. . PROBO MOTOR Y SEÑAL DE MWD, OK. . METE BNA. 6 3/4" + BH DIRECCIONAL A 237 M. . DESLIZO Y CORTO CABLE DE PERFORACION. . PROBO PREVENTORES Y ANULAR CON 2000 PSI, OK. . EFECTUO MANTENIMIENTO AL EQUIPO DE PERFORACION. . EFECTUO SIMULACRO DE DESCONTROL DE POZO. . REBAJO CEMENTO Y ACCESORIOS. . CON BARRENA PDC DE 6 3/4" PERFORA DE 507/507 M. . CIRCULO TIEMPO DE ATRAZO; EFECTUO PRUEBA DE GOTEO, TVD 455 MTS. LODO 1.35, PRESION 1781PSI, DENSIDA D EQUIVALENTE DE 4.10 GR/CC.

Total de Esperas

Compntes. y Eq. Aux

19:15-24:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 507/649 M; ULT. 3 M(1'-1'-1'). . 0:00-5:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 649/800 M; ULT. 3 M(1'-1'-1'). .

Resumen: METIO Y CEMENTO TR 7 5/8" A 504M; INST./PBO. C.S.C; REALIZO PBA. DE GOTEO; C/BNA. 6 3/4" PERFORA HASTA 649 M. Sig. Oper: CON BNA. 6 3/4" PERFORAR DIERCCIONAL A 2107 M. Suptte. Programa: TOMAR REGISTROS; METER Y CEMENTAR TR 5½". Telefono Observ: Ecologia: Urgentes:

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.02 0.02

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

01/06/2005 6:53:05

DIVISION NORTE U. O. POZA RICA

Page 101 of 146

31/05/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 649 557 BAKER Marca 24:00 1405 1087 7300701 Serie 05:00 1540 1197 6 3/4 Diametro Ava/Ind 756 /353.09 PDC Tipo -10-10-10-10-1 Ult.Cont Toberas 1036 Prox.Co Mts. Perf. 34 Litologi Hrs. Op. Prom x m 1.97 3 Ult. Mts. 3-3-3 0 Costo x m Amp. Inic. 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 7 5/8 504-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 5 1/2 2107-P.T B.L Prog--> 1405 156.54 1086.5 44° 53' SW 1°8' Emp. Real--> C2 1361 125.98 1055.14 44° 53' SW 1°8' Lodo VERSADRILL 1332 105.71 1034.7 45° 50' SW 1°52' Dens: 1.39 Visc: 62 Temp °C: 53 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 17 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 24 %Aceite: 62 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 21 YP: 14 Emul: 600 R.A.A: 82/18 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna 6/6 Tons Camisas B-1 5 1/2 x 9 90 Epm Dens.Eq.C Rotaria RPM Camisas B-2 5 1/2 x 9 0 Epm Pres.Red: Kg/cm2 con: Epm P. Bomba 60 Kg/cm2 Gasto 238 GPM Sim. Control Brotes Torque 80/80 Amps V. Anular PPM KOOMEY Peso Sart /4 Tons Hules TP: Fren/Corona: Val. Sup: Val.Inf: Val. Pie: BOPS Resumen Dia Anterior METIO Y CEMENTO TR 7 5/8" A 504M; INST./PBO. C.S.C; REALIZO PBA. DE GOTEO; C/BNA. 6 3/4" PERFORA HASTA 649 M. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-6:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 649/826 M; ULT. 3 M(1'-1'-1'). . PERFORACION 3.98 6:00-6:15 EFECTUO MANTENIMIENTO AL EQUIPO. . Total de Dias 4.08 6:15-24:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1118/1405 M; ULT. 3 M (2'-2'-2'). 0:00-5:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1405/1540 M; ULT. 3 M (3'-3'-3').

CIAS. DE SERVICIO Total de Esperas

Compntes. y Eq. Aux

Resumen: CON BNA. PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1118/1405 M; UL. 3 M. (2'-2'-2'). Sig. Oper: CON BNA. PDC DE 6 3/4" PERFORAR DIERCCIONAL HASTA 2107 M. Programa: TOMAR REGISTROS; METER Y CEMENTAR TR 5½". Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.03 0.03

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

02/06/2005 6:53:15

DIVISION NORTE U. O. POZA RICA

Page 97 of 147

01/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1405 1087 BAKER BAKER Marca 24:00 1869 1522 7300701 7300578 Serie 05:00 1912 1566 6 3/4 9 1/2 Diametro Ava/Ind 464 /375.36 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1408 405 Prox.Co Mts. Perf. 58 23 Litologi Hrs. Op. Prom x m 2.47 3.41 3 Ult. Mts. 6-3-3 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 7 5/8 504-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 5 1/2 2107-P.T B.L Prog--> 1730 916.76 1382.79 2° 13' NW 65°48' Emp. Real--> C2 1405 156.54 1086.5 44° 53' SW 1°8' Lodo VERSADRILL 1361 125.98 1055.14 44° 53' SW 1°8' Dens: 1.39 Visc: 65 Temp °C: 58 %Arena: Filtrado: 4 Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 19 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 24 %Aceite: 62 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 14 Emul: 603 R.A.A: 82/18 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna 5/5 Tons Camisas B-1 5 1/2 x 9 90 Epm Dens.Eq.C Rotaria RPM Camisas B-2 5 1/2 x 9 0 Epm Pres.Red: Kg/cm2 con: Epm P. Bomba 28 Kg/cm2 Gasto 238 GPM Sim. Control Brotes Torque 60/60 Amps V. Anular PPM KOOMEY Peso Sart /9 Tons Hules TP: Fren/Corona: Val. Sup: Val.Inf: Val. Pie: BOPS Resumen Dia Anterior CON BNA. PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1118/1405 M; UL. 3 M. (2'-2'-2'). Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-15:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1405/1730 M; ULT. 3 M (2'-2'-3'). PERFORACION 4.98 15:00-15:15 EFECTUO MANTENIMIENTO AL TOP DRIVE. . Total de Dias 5.08 15:15-24:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1730/1869 M; ULT. 3 M (2'-3'-2'). 0:00-5:00 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1869/1912 M; ULT. 3 M (6'-3'-3').

CIAS. DE SERVICIO Total de Esperas

Compntes. y Eq. Aux

Resumen: CON BNA. PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1405/1869 M; UL. 3 M. (2'-2'-3'). Sig. Oper: CON BNA. PDC DE 6 3/4" PERFORAR DIERCCIONAL HASTA 2107 M. Programa: TOMAR REGISTROS; METER Y CEMENTAR TR 5½". Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.04 0.04

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

03/06/2005 6:53:31

DIVISION NORTE U. O. POZA RICA

Page 97 of 146

02/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER Marca 24:00 2117 1771 7300701 Serie 05:00 2117 1771 6 3/4 Diametro Ava/Ind 248 /354.06 PDC Tipo -10-10-10-10-1 Ult.Cont Toberas 1656 Prox.Co Mts. Perf. 81 Litologi Hrs. Op. Prom x m 2.93 3 Ult. Mts. 3-4-4 0 Costo x m Amp. Inic. 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 7 5/8 504-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 5 1/2 2107-P.T B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna 5/5 Tons Camisas B-1 5 1/2 x 9 88 Epm Dens.Eq.C Rotaria RPM Camisas B-2 5 1/2 x 9 0 Epm Pres.Red: Kg/cm2 con: Epm P. Bomba 60 Kg/cm2 Gasto 232 GPM Sim. Control Brotes Torque 86/86 Amps V. Anular PPM KOOMEY Peso Sart /9 Tons Hules TP: Fren/Corona: Val. Sup: Val.Inf: Val. Pie: BOPS Resumen Dia Anterior CON BNA. PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1405/1869 M; UL. 3 M. (2'-2'-3'). Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-23:45 CON BARRENA PDC DE 6 3/4" PERFORA DIRECCIONAL DE 1869/2117M; ULT. 3 M (3'-4'-4'). PERFORACION 5.98 23:45-24:00 CIRCULA POZO. . Total de Dias 6.08 0:00-1:30 CIRCULO POZO. . 1:30-5:00 REALIZO PLATICA DE SEGURIDAD; BOMBEO BACHE DE LIMPIEZA; SACANDO BARRENA A 730 M. .

CIAS. DE SERVICIO Total de Esperas

Compntes. y Eq. Aux

Resumen: CON BNA. PDC DE 6 3/4" PERFORO DIRECCIONAL HASTA 2117M; CIRCULA POZO. Sig. Oper: TOMAR REGISTROS. Programa: METER Y CEMENTAR TR 5½"; INSTALAR Y PROBAR C.S.C. DEFINITIVAS. Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.06 0.06

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

06/06/2005 6:53:01

DIVISION NORTE U. O. POZA RICA

Page 98 of 141

05/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /235.77 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 7 5/8 504-ECH Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo 5 1/2 2107-P.T B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior TOMO REG. LDL-CNL-BHC-AIT-RG DE 2117/504 M; TOMO REG. OBMI- GR DE 200/1600 M; ARMA HERRTA. DE REG. CMR-GR. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-5:00 METIO BARRENA PDC 6 3/4" HASTA 2117 M. . PERFORACION 8.98 5:00-6:30 CIRCULO POZO HOMOGENIZANDO LODO A 1.41 GR/CC; BOMBEO BACHE DE LIMPIEZA. . Total de Dias 9.08 6:30-16:00 16:00-16:30 16:30-17:00 17:00-24:00 0:00-2:30

SACO BARRENA 6 3/4" A SUPERFICIE; DESMANTELO TP, TRAMO POR TRAMO. . RECUPERO BUJE DE DESGASTE. . EFECTUO PREPARATIVOS PARA METER TR 5½"; EFECTUO PLATICAS DE SEGURIDAD. . METE TR 5½" 17 LB/FT N-80 BCN A 1600 M; LLENA CADA 5 TRAMOS Y ROMPIO GELES CADA 300 M. METIO TR 5½" 17 LB/FT N-80 BCN A 2114 M; LLENO CADA 5 TRAMOS Y ROMPIO GELES CADA 300 M; E.M.R. DE 0.00/5.6 5 M; 32 TRAMOS DE TR 5½" DE 5.65/449.77 M; EMPACADOR INFLABLE SMITH DE 449.77/425.19 M; 84 TRAMOS DE TR 5 ½" DE 452.19/1636.65 M; 1 TRAMOS CORTO DE TR 5½" DE 1636.65/1643.64 M; 33 TRAMOS DE TR 5½" DE 1643.64/2099.5 CIAS. DE SERVICIO 0 M; COPLE FLOTADOR DE 2099.5/2099.88 M; 1 TRAMOS DE TR 5½" 2099.88/2113.56 M; ZAPATA FLOTADORA DE 2113.56 Total de Esperas /2114 M.

0.06 0.06

2:30-3:30 INSTALO CABEZAL DE CIRCULACION Y CIRCULO POR TR 5½". . 3:30-4:00 CAMERON COLGO TR 5½". . 4:00-5:00 INSTALO CABEZAL DE CEMENTACION Y LINEAS; CIRCULA POZO. .

Compntes. y Eq. Aux

F/S

Resumen: METIO BARRENA HASTA 2117 M. EN VIAJE DE CALIBRACION; BOMBEO BACHE DE LIMPIEZA; SACO BNA A SUP; METE TR 5½" A 1600 M. Sig. Oper: METER TR 5½" N-80 17 LB/FT BCN.. Suptte. Programa: CEMENTAR TR 5½; INSTALAR Y PROBAR C.S.C. DEFINITIVAS. Telefono Observ: Ecologia: Urgentes:

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

07/06/2005 6:52:41

DIVISION NORTE U. O. POZA RICA

Page 96 of 144

06/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 534 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: PER Inicio: 28/05/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /223.33 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior METIO BARRENA HASTA 2117 M. EN VIAJE DE CALIBRACION; BOMBEO BACHE DE LIMPIEZA; SACO BNA A SUP; METE TR 5½" Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-2:30 METIO TR 5½" 17 LB/FT N-80 BCN A 2114 M; LLENO CADA 5 TRAMOS Y ROMPIO GELES CADA 300 M; E.M.R. DE 0.00/5. PERFORACION 9.48 65 M; 32 TRAMOS DE TR 5½" DE 5.65/449.77 M; EMPACADOR INFLABLE SMITH DE 449.77/425.19 M; 84 TRAMOS DE TR Total de Dias 9.58 5½" DE 452.19/1636.65 M; 1 TRAMOS CORTO DE TR 5½" DE 1636.65/1643.64 M; 33 TRAMOS DE TR 5½" DE 1643.64/2099. 50 M; COPLE FLOTADOR DE 2099.5/2099.88 M; 1 TRAMOS DE TR 5½" 2099.88/2113.56 M; ZAPATA FLOTADORA DE 2113.5 6/2114 M.

2:30-3:30 3:30-4:00 4:00-5:00 5:00-5:30 5:30-9:00

INSTALO CABEZAL DE CIRCULACION Y CIRCULO POR TR 5½". . CAMERON COLGO TR 5½". . INSTALO CABEZAL DE CEMENTACION Y LINEAS; CIRCULA POZO E INSTALA UNIDAD DE CEMENTACIONES. CIAS. DE SERVICIO REALIZO PLATICA DE SEGURIDAD. . CEMENTO TR DE 5 1/2" DE LA SIGUIENTE SECUENCIA: BOMBEO 3 BLS. DE DIESEL A 3 BPM; SOLTO TAPON LIMPIADO Total de Esperas R, BOMBEO 30 BLS. DE MUDPUSH II DE 1.55 G/CC A 3 BPM, 65 BLS. DE CEMENTO 1.55 GR/CC A 3 BPM, 28.8 BLS. DE C EMENTO DE 1.90 GR/CC A 3 BPM, LIBERO TAPON RIGIDO, DESPLAZO CON 162 BLS. DE SALMUERA DE 1.10 GR/CC A 3, 2, 1, 0.5 BPM, PRESION FINAL DE CIRCULACION DE 1650 PSI. SENTO TAPON CON 2200 PSI/5 MIN; LIBERO PRESION E N LA UNIDAD DE BOMBEO; RETORNANDO 1 BL. EN CAJAS, EL EQUIPO DE FLOTACION FUNCIONO CORRECTAMENTE ; OBSERVO CIRCULACION NORMAL DURANTE LA CEMENTACION; ACTIVO EMPACADOR INFLABLE CON 2700 - INFLÓ A 3100 PSI OK.

9:00-9:30 DESMANTELO CABEZAL DE CEMENTACIONES Y LINEAS. . 9:30-10:30 LEVANTO PREVENTORES; CORTO Y BISELO TR DE 5½". . 10:30-12:00 INSTALO SECCION "B" DE 11"- X 7 1/16"; PROBO SELLOS CON 5000 PSI OK; INSTALO ADAPTADOR 7-1/16" X 2-9/16" Y VA Compntes. y Eq. Aux LVULA MAESTRA DE 2-9/16".

Resumen: METIO Y CEMENTO TR 5½"; INSTALO Y PROBO C.S.C. DEFINITIVAS. Sig. Oper: DESMANTELAR EQUIPO 100%. Programa: TRANSPORTAR EQUIPO 100% AL POZO AGUAFRIA-669 EN LA PLATAFORMA AGUAFRIA-706. Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.06 0.06

F/S

REPORTE DIARIO DE OPERACIONES ‐ TERMINACION

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

27/06/2005 6:53:13

DIVISION NORTE U. O. POZA RICA

Page 109 of 149

26/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 536 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: TER Inicio: 17/06/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /223.33 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior BAJO MASTIL; PROBO VALVULA MECANICA; ARMO EQUIPO DE CONTROL DE PRESION; BAJO CALIBRADOR 4 11/16" A 900 M. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-4:00 BAJO CANASTA CALIBRADORA DE 4 11/16" SIN RESTRINCIONES A 2093 M. . PERFORACION 9.48 4:00-5:00 CAMBIO CABEZA DE REGISTROS; PROBO EQUIPO DE CONTROL DE PRESION CON 105.5 KG/CM2. . TERMINACION 2.04 5:00-5:30 EFECTUO PLATICAS DE SEGURIDAD. . Total de Dias 11.63 5:30-22:30 CON PISTOLAS 3 3/8"; ENTUBADAS, 13 CPM; FASE 60, PENETRACION 22", ORIFICIO 0.44"; EFECTUO DISPAROS TIPO V A LOS INTERVALOS, 1754-1751, 1751-1745, 1745-1739, 1739-1733, 1733-1727, 1727-1721 M; PRESION ACUMULADA 63.3 KG/CM2; SACO HERRAMIENTA A SUPERFICIE.

22:30-24:00 ARMO Y METE EMPACADOR RECUPERABLE DE 5-1/2" X 2-7/8", SOT-1 W/L, DE 15.5-17 LBS/PIE, SERIE: 20-405-030.

Total de Esperas 0:00-1:00 ANCLO EMPACADOR A 1605 M; SACÓ HERRAMIENTA DE ANCLAJE A SUPERFICIE. . 1:00-3:30 DESMANTELÓ EQUIPO DE CONTROL DE PRESIÓN. . 3:30-5:00 ORGANIZÓ ÁREA DE TRABAJO; TRANSPORTÓ Y MIDIÓ TUBERIA DE PRODUCCIÓN; ARMANDO EQUIPO DE APRIETE C OMPUTARIZADO.

Compntes. y Eq. Aux

Resumen: CALIBRO POZO A 2093 M; DISPARO INTERVALO 17451721 M; ARMO Y METE EMPACADOR DE 5½". Sig. Oper: METER Y ANCLAR EMPACADOR. Programa: METER Y PROBAR APAREJO DE PRODUCCION. Observ: Ecologia: Urgentes:

Suptte. Telefono

PRIDE129

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.00

F/S

Cia: SCHLUMBERGER-DOWEL

PEMEX EXPLORACION PRODUCCION

28/06/2005 6:52:29

DIVISION NORTE U. O. POZA RICA

Page 111 of 150

27/06/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: 536 Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: TER Inicio: 17/06/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /223.33 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior CALIBRO POZO A 2093 M; DISPARO INTERVALO 17451721 M; ARMO Y METE EMPACADOR DE 5½". Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-1:00 ANCLO EMPACADOR A 1605 M; SACO HERRAMIENTA DE ANCLAJE A SUPERFICIE. . PERFORACION 9.48 1:00-3:30 DESMANTELO EQUIPO DE CONTROL DE PRESION. . TERMINACION 2.71 3:30-5:30 ORGANIZO AREA DE TRABAJO; TRANSPORTO Y MIDIO TUBERIA DE PRODUCCION; ARMO EQUIPO DE APRIETE COMP Total de Dias 12.29 UTARIZADO.

5:30-12:30 INSTALO ZAPATA CONECTORA (ON-OFF TOOL) DE 4-1/2" X 3-1/4" A TUBERIA DE PRODUCCION. BAJO 172 TRAMOS DE TUBERIA 2-7/8", J-55, CALIBRADA CON 2-11/32", APRIETE COMPUTARIZADO DE 1650 LBS/PIE + 4 TRAMOS DE TUBERIA 2-7/8", N-80, CALIBRADA CON 2-11/32", APRIETE COMPUTARIZADO DE 2300 LBS/PIE. LOCALIZÓ CIMA DEL EMPACADO R EN 1605 M. . 12:30-13:00 CIRCULO SOBRE EL TOPE DEL EMPACADOR 40 BLS DE AGUA TRATADA AL 2 % DE KCL CON RETORNOS LIMPIOS.

Total de Esperas

0.00

13:00-14:00 ESPACIO TUBERIA CON UNA MADRINA DE 2.46 M. DE 2-7/8", EUE, N-80, CALIBRADA CON 2-11/32" APRIETE COMPUTAR IZADO A 2300 LBS/PIE. 14:00-14:30 INSTALO BOLA COLGADORA (VALVULA "H" INSTALADA) CAMERON DE 7-1/16" X 2-7/8". REALIZO ENGANCHE DEL EMPA CADOR SOT-1 DE 5-1/2" A 1605 M. CON 4.5 TON/TEN. ASENTO BOLA COLGADORA SOBRE LA SECCION "B" DEL CABEZ AL, APLICO 3.2 TON/PESO SOBRE EL EMPACADOR; DESCRIPCIÓN DEL APAREJO DE PRODUCCION; 1 COLGADOR DE TUBERÍA DE PRODUCCIÓN; 1 TRAMO DE 2-7/8", N-80, 8HRR, 6.5 LBS/PIE; 1 MADRINA DE 2-7/8", N-80, 8HRR, 6.5 LBS/PI E; 3 TRAMOS DE 2-7/8", N-80, 8HRR, 6.5 LBS/PIE; 172 TRAMOS J-55, 2-7/8", 8HRR, 6.5 LBS/PIE; 1 ZAPATA CONECTORA; 1 NIPLE CONECTOR PERFIL "X"; 1 EMPACADOR SEMIPERMANENTE SOT-1 WL DE 5-1/2", 15.5-17 LBS/PIE, SERIE: 20-40 5-030; 1 MADRINA DE 2-7/8", N-80, 8HRR, 6.5 LBS/PIE; 1 COPLE DE TAPÓN EXPULSABLE (09 PINES).

Compntes. y Eq. Aux

14:30-16:00 RETIRANDO PISO DE TRABAJO Y CONJUNTO DE PREVENTORES DE 7-1/16"-5000 PSI. BAJÓ MASTIL DEL EQUIPO.

Resumen: ANCLO EMPACADOR; METIO APAREJO DE TERMINACION A 1605 M; RETIRO PISO DE TRABAJO. Sig. Oper: EFECTUAR PRUEBAS A TR Y TP. Programa: EFECTUAR FRACTURA HIDRAULICA. Observ: Ecologia: Urgentes:

Suptte. Telefono

PRIDE129

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

F/S

Cia:

PEMEX EXPLORACION PRODUCCION

13/07/2005 6:53:18

DIVISION NORTE U. O. POZA RICA

Page 114 of 152

12/07/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: S/E Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: TER Inicio: 17/06/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /223.33 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior ANCLO EMPACADOR; METIO Y PROBO APAREJO DE PRODUCCION A 1605 M; RETIRO PISO DE TRABAJO. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 13:30-14:00 INSTALO UNIDAD DE ALTA PRESION; INSTALO CONEXIONES SUPERFICIALES. . PERFORACION 9.48 14:00-14:30 PROBO LINEAS CON 4500 PSI. . TERMINACION 3.21 14:30-15:00 CON UNIDAD DE ALTA PRESION, BOMBEO 2.8 BLS DE SALMUERA CON UN GASTO DE 1.2 BPM; PRESION INICIAL: 873 Total de Dias 12.79 PSI (61.37 KG/CM2); PRESION DE RUPTURA 2051 (144.18 KG/CM2), CONTINUO BOMBEANDO A 4 BPM HASTA COMPLET AR 24 BLS; ISIP = 1525 PSI (107.2 KG/CM2).

15:00-24:00 EFECTUA MONITOREO DE PREIONES A LAS 15:00 HRS. C/1525 PSI; 16:00 HRS. C/1410 PSI; 17:00 HRS. C/1100 PSI; 18:0 0 HRS. C/970 PSI; 19:00 HRS. C/947PSI; 20:00 HRS. C/933 PSI; 21:00 HRS. C/924 PSI; 22:00 HRS. C/919 PSI; 23:00 HRS. C/ 915 PSI; 24:00 HRS. C/915 PSI; 0:00-5:00 EFECTUA MONITOREO DE PREIONES A LAS 01:00 HRS. C/905 PSI; 02:00 HRS. C/905 PSI; 03:00 HRS. C/905 PSI; 04:00 H Total de Esperas RS. C/901 PSI; 05:00 HRS. C/901 PS.

Compntes. y Eq. Aux

Resumen: EFECTUA MONITOREO DE PRESIONES. Sig. Oper: MONITOREA PRESIONES. Programa: MONITOREA PRESIONES. Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.00

F/S

Cia:

PEMEX EXPLORACION PRODUCCION

14/07/2005 6:54:05

DIVISION NORTE U. O. POZA RICA

Page 117 of 152

13/07/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: S/E Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: TER Inicio: 17/06/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER BAKER Marca 24:00 2117 1771 7300701 7300578 Serie 05:00 2117 1771 6 3/4 9 1/2 Diametro Ava/Ind 248 /223.33 PDC PDC Tipo -10-10-10-10-1 12-12-12-12-1 Ult.Cont Toberas 1656 405 Prox.Co Mts. Perf. 81 23 Litologi Hrs. Op. Prom x m 2.93 3.41 3 Ult. Mts. 3-4-4 1-2-6 0 0 Costo x m 0 Amp. Inic. 0-0-0 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior EFECTUA MONITOREO DE PRESIONES. Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-15:00 EFECTUA MONITOREO DE PREIONES A LAS 01:00 HRS. C/905 PSI; 02:00 HRS. C/905 PSI; 03:00 HRS. C/905 PSI; 04:00 H PERFORACION 9.48 RS. C/901 PSI; 05:00 HRS. C/901 PSI; 06:00 HRS. C/896 PSI; 07:00 HRS. C/896 PSI; 08:00 HRS. C/896 PSI; 09:00 HRS. C/89 TERMINACION 3.83 6 PSI; 10:00 HRS. C/892 PSI; 11:00 HRS. C/892 PSI; 12:00 HRS. C/887 PSI; 13:00 HRS. C/883 PSI; 14:00 HRS. C/883 PSI; 15: Total de Dias 13.42 00 HRS. C/883 PSI; TERMINA EL MONITOREO DE PRESION POR 24 HRS.

Total de Esperas

Compntes. y Eq. Aux

Resumen: MONITOREO PRESIONESPOZO DURANTE 24 HRS. Sig. Oper: EFECTUAR FRACTURA HIDRAULICA. Programa: EFECTUAR LIMPIEZA SUPERFICIAL. Observ: Ecologia: Urgentes:

Suptte. Telefono

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.00

F/S

Cia:

PEMEX EXPLORACION PRODUCCION

29/08/2005 6:54:25

DIVISION NORTE U. O. POZA RICA

Page 104 of 147

28/08/2005 Proyecto 71752A44 ACTIVO INTEGRAL POZA RICA - ALTAMIRA REPORTE DIARIO DE OPERACIONES Equipo: S/E Pozo: AGUAFRIA 792 (DES) Conductor: Esp. Rot-NM: Actividad: TER Inicio: 17/06/2005 Objetivo CHICONTEPEC Prof. Prog. 2107/ 1767 Dias Prog: 22 T. Agua: Prox. Mov: AGUAFRIA-A Cant. Long. Profund Desarr. Vertical Barrenas Actual Anterior Herramienta Obs. 00:00 1869 1522 BAKER Marca 24:00 2117 1771 7300701 Serie 05:00 2117 1771 6 3/4 Diametro Ava/Ind 248 /223.33 PDC Tipo 10-10-10-10-1 Ult.Cont Toberas 1656 Prox.Co Mts. Perf. 81 Litologi Hrs. Op. Prom x m 2.93 3 Ult. Mts. 3-4-4 0 Costo x m 0 Amp. Inic. 0-0-0 Desgaste Ult. TR Nucleos R Int. Prog Int. Disp Ult. Reg. 5 1/2 2114-P.T Prox.T Desv'n PID/Prof Desp. Ho Prof. Vert Ang. Rumbo B.L Prog--> 2117 919.19 1770.74 1° 48' NW 18°0' Emp. Real--> C2 2100 919.03 1753.75 1° 48' NW 17°34' Lodo VERSADRILL 2086 918.89 1739.76 2° 7' NW 14°9' Dens: 1.41 Visc: 62 Temp °C: 63 %Arena: Filtrado: Calcio: Enjarre: 1 Alc: Pruebas de Formacion Materiales Gel 0: 20 Gel 10: 29 Cloruros: 33000 PH: %Solidos: 25 %Aceite: 61 %Agua: Prub.Gote gr/cm3 a 14 VA: 33 VP: 25 YP: 11 Emul: 610 R.A.A: 81/19 MBT: Grad.Form gr/cm2xm Grad.Frac gr/cm2xm gr/cm3 P. S-Bna Tons Camisas B-1 Epm Dens.Eq.C Rotaria RPM Camisas B-2 Epm P. Bomba Kg/cm2 Gasto GPM Sim. Control Brotes Torque Amps V. Anular PPM KOOMEY Peso Sart Tons BOPS Resumen Dia Anterior OBSERVA POZO FLUYENDO A PRESA P/EST. 5 MM C/1011 PSI (71.09K KG/CM2), A 37.8 BPH; VO. REC. 1285.3 BLS; FLUYE Operación Pozo: AGUAFRIA 792 (DES) MOVIMIENTO 0.10 0:00-5:00 OBSERVA POZO FLUYENDO A PRESA POR ESTRANGULADOR DE 5 MM CON 1010 PSI (71.00 KG/CM2), A 37.8 BPH; VO PERFORACION 9.48 L. ACUMULADO 1427.4 BLS; FLUYE ACEITE. TERMINACION 6.04 5:00-13:30 OBSERVA POZO FLUYENDO A PRESA POR ESTRANGULADOR DE 5 MM CON 994.5 PSI (69.9 KG/CM2), A 37.5 BPH; VOL. Total de Dias 15.63 ACUMULADO 2076.3 BLS; FLUYE ACEITE; ALINEO POZO A BATERIA AGUAFRIA II POR LINEA DE 4"; ENTREGO POZO A P EMEX. .

Total de Esperas

Compntes. y Eq. Aux

Resumen: OBS. POZO FLUYENDO A PRESA P/EST. 5 MM C/994.5 PSI (71.09 KG/CM2); A 37.5 BPH; VO. REC. 2076.3 BLS; FLUYE ACEITE. Sig. Oper: ENTREGO POZO A BATERIA. Suptte. Programa: ENTREGO POZO A BATERIA. Telefono Observ: Ecologia: Urgentes:

"2003 año del CCL Aniversario del Natalicio de Don Miguel Hidalgo y Costilla, Padre de la Patria"

0.00

F/S

SURVEY FINAL

Surveys Agua Fria 792 Report Date: Client: Field: Structure / Slot: Well: Borehole: UWI/API#: Survey Name / Date: Tort / AHD / DDI / ERD ratio: Grid Coordinate System: Location Lat/Long: Location Grid N/E Y/X: Grid Convergence Angle: Grid Scale Factor:

Comments

Tie-In

Measured Depth (m)

June 3, 2005 Pemex Exploracion y Produccion Agua Fria Field Yate 1 V2.0 Structure / Contrapozo C Agua Fria 792 Agua Fria 792

Survey / DLS Computation Method: Vertical Section Azimuth: Vertical Section Origin: TVD Reference Datum: TVD Reference Elevation: Sea Bed / Ground Level Elevation: Magnetic Declination: Total Field Strength: Magnetic Dip: Declination Date: Magnetic Declination Model: North Reference: Total Corr Mag North -> True North: Local Coordinates Referenced To:

Surveys Agua Fria 792 / May 30, 2005 143.243° / 930.01 m / 5.718 / 0.525 NAD27 UTM Zone 14N N 20 31 17.611, W 97 38 23.530 N 2269654.400 m, E 641814.610 m +0.47688709° 0.99984856

Inclination

Azimuth

TVD

( deg )

( deg )

(m)

Vertical Section (m)

NS

EW

Closure

(m)

(m)

(m)

Closure Azimuth ( deg )

Minimum Curvature / Lubinski 268.620° N 0.000 m, E 0.000 m Rotary Table 116.5 m relative to MSL 111.000 m relative to MSL 5.433° 42302.494 nT 49.066° May 30, 2005 BGGM 2004 True North +5.433° Well Head

DLS ( deg/30 m )

Tool Face ( deg )

0.00 100.00 132.00 159.00 188.00

0.00 1.82 3.17 6.22 9.87

0.00 222.94 235.72 248.11 255.20

0.00 99.98 131.95 158.86 187.57

0.00 1.11 2.21 4.20 8.10

0.00 -1.16 -2.03 -3.00 -4.22

0.00 -1.08 -2.16 -4.13 -8.00

0.00 1.59 2.97 5.11 9.04

0.00 222.94 226.72 234.04 242.18

0.00 0.55 1.36 3.55 3.91

-137.06M -124.28M -111.89M 18.74G 22.61G

215.00 243.00 273.00 300.00 328.00

13.39 17.71 22.57 26.84 30.85

261.40 266.44 269.66 270.03 268.76

214.01 240.98 269.14 293.66 318.18

13.45 20.93 31.25 42.53 56.03

-5.28 -6.03 -6.35 -6.37 -6.53

-13.33 -20.79 -31.10 -42.39 -55.89

14.33 21.64 31.75 42.86 56.27

248.39 253.83 258.47 261.45 263.34

4.14 4.85 4.98 4.75 4.35

19.81G 14.37G 2.24G -9.25G -19.70G

357.00 386.00 414.00 444.00 473.00

34.55 38.58 41.77 43.37 43.50

266.44 268.50 269.92 269.83 269.71

342.58 365.87 387.27 409.36 430.42

71.69 88.96 107.02 127.31 147.24

-7.20 -7.95 -8.19 -8.23 -8.31

-71.54 -88.79 -106.85 -127.14 -147.08

71.90 89.15 107.16 127.41 147.32

264.25 264.89 265.62 266.30 266.77

4.04 4.36 3.56 1.60 0.16

17.77G 16.57G -2.21G -32.44G 87.24G

489.00 520.00 548.00 577.00 607.00

43.51 43.03 43.69 44.16 46.04

270.00 273.54 271.77 268.31 267.87

442.02 464.60 484.96 505.85 527.02

158.25 179.46 198.64 218.74 239.99

-8.34 -7.69 -6.80 -6.79 -7.50

-158.10 -179.33 -198.53 -218.64 -239.88

158.32 179.49 198.65 218.75 240.00

266.98 267.55 268.04 268.22 268.21

0.37 2.39 1.48 2.53 1.91

102.48G -62.14G -80.17G -9.57G -145.13G

636.00 665.00 694.00 723.00 752.00

44.94 45.52 44.75 45.73 45.18

266.78 266.52 266.16 268.65 268.13

547.35 567.77 588.23 608.65 629.00

260.66 281.24 301.78 322.36 343.03

-8.46 -9.66 -10.97 -11.90 -12.48

-260.54 -281.09 -301.60 -322.17 -342.83

260.67 281.26 301.80 322.39 343.06

268.14 268.03 267.92 267.88 267.91

1.39 0.63 0.84 2.09 0.69

-17.75G -161.79G 61.88G -146.21G -9.20G

781.00 810.00 839.00 868.00 898.00

46.57 47.21 46.35 44.87 44.22

267.82 268.05 267.06 266.17 265.72

649.19 669.00 688.86 709.15 730.53

363.85 385.01 406.14 426.85 447.87

-13.22 -13.98 -14.88 -16.10 -17.59

-363.63 -384.79 -405.90 -426.59 -447.58

363.87 385.04 406.18 426.89 447.93

267.92 267.92 267.90 267.84 267.75

1.46 0.68 1.16 1.67 0.72

14.78G -140.35G -157.06G -154.26G 67.27G

926.00 955.00 983.00 1013.00 1041.00

44.57 46.21 46.38 46.92 45.16

266.89 266.53 268.91 270.76 269.49

750.54 770.90 790.25 810.85 830.28

467.45 488.08 508.32 530.12 550.27

-18.85 -20.04 -20.84 -20.90 -20.86

-467.13 -487.74 -507.96 -529.77 -549.93

467.51 488.15 508.39 530.19 550.32

267.69 267.65 267.65 267.74 267.83

0.95 1.72 1.85 1.45 2.12

-9.01G 85.18G 68.77G -152.99G 49.81G

1071.00

46.35

271.41

851.21

571.75

-20.68

-571.42

571.79

267.93

1.82

-159.97G

SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Contrapozo Bld( do31rt-546 C\Agua ) Fria 792\Agua Fria 792\Surveys Agua Fria 792 Generated 11/3/2005 8:34 AM Page 1 of 2

Proy. a Fondo

1099.00 1129.00 1157.00 1187.00

44.36 45.98 44.32 45.42

270.37 271.24 270.13 270.24

870.89 892.04 911.79 933.05

591.65 612.91 632.75 653.90

-20.37 -20.07 -19.83 -19.76

-591.33 -612.61 -632.45 -653.62

591.68 612.93 632.76 653.92

268.03 268.12 268.20 268.27

2.27 1.73 1.97 1.10

21.16G -155.03G 4.07G 175.40G

1215.00 1245.00 1273.00 1302.00 1332.00

44.72 47.23 46.26 44.50 45.85

270.32 272.35 271.67 271.12 271.52

952.82 973.67 992.86 1013.23 1034.37

673.72 695.26 715.62 736.23 757.49

-19.67 -19.15 -18.44 -17.93 -17.44

-673.44 -695.00 -715.38 -736.02 -757.29

673.73 695.27 715.62 736.23 757.49

268.33 268.42 268.52 268.60 268.68

0.75 2.90 1.17 1.87 1.38

30.89G -153.19G -167.65G 12.01G -166.85G

1361.00 1390.00 1419.00 1448.00 1477.00

44.53 45.64 41.60 37.03 32.52

271.08 271.86 271.22 271.19 271.51

1054.81 1075.29 1096.28 1118.71 1142.52

778.04 798.55 818.53 836.88 853.39

-16.98 -16.45 -15.91 -15.52 -15.13

-777.86 -798.38 -818.38 -836.74 -853.28

778.04 798.55 818.53 836.89 853.41

268.75 268.82 268.89 268.94 268.98

1.40 1.28 4.20 4.73 4.67

26.73G -173.99G -180.00G 177.81G -156.59G

1506.00 1535.00 1564.00 1592.00 1622.00

28.50 23.70 19.48 15.40 10.60

267.82 267.10 267.27 266.74 265.44

1167.50 1193.54 1220.50 1247.21 1276.43

868.10 880.86 891.52 899.91 906.65

-15.19 -15.75 -16.27 -16.71 -17.15

-867.99 -880.73 -891.39 -899.77 -906.50

868.12 880.87 891.54 899.92 906.66

269.00 268.98 268.95 268.94 268.92

4.59 4.98 4.37 4.37 4.81

-176.55G 179.23G -178.02G -177.15G 179.39G

1653.00 1681.00 1710.00 1738.00 1768.00

5.53 2.89 2.13 2.19 1.80

266.00 289.22 335.48 332.99 313.58

1307.11 1335.04 1364.01 1391.99 1421.97

910.99 913.00 913.89 914.33 914.91

-17.49 -17.35 -16.62 -15.67 -14.83

-910.83 -912.85 -913.76 -914.22 -914.82

911.00 913.01 913.91 914.35 914.94

268.90 268.91 268.96 269.02 269.07

4.91 3.31 2.16 0.12 0.77

158.37G -24.52M -27.01M -46.42M -44.75M

1796.00 1825.00 1854.00 1883.00 1912.00

1.71 1.56 1.52 1.26 1.04

315.25 310.50 324.45 332.37 336.95

1449.96 1478.95 1507.94 1536.93 1565.92

915.51 916.10 916.61 916.97 917.21

-14.23 -13.67 -13.10 -12.50 -11.98

-915.43 -916.04 -916.56 -916.93 -917.18

915.54 916.14 916.65 917.02 917.26

269.11 269.15 269.18 269.22 269.25

0.11 0.21 0.39 0.33 0.25

-49.50M -35.55M -27.63M -23.05M -11.90M

1942.00 1970.00 2000.00 2028.00 2057.00

1.67 2.39 3.44 2.70 2.40

348.10 350.39 345.83 345.19 346.43

1595.91 1623.90 1653.86 1681.82 1710.79

917.39 917.54 917.83 918.17 918.46

-11.30 -10.32 -8.84 -7.38 -6.13

-917.38 -917.56 -917.89 -918.26 -918.58

917.45 917.62 917.93 918.29 918.60

269.29 269.36 269.45 269.54 269.62

0.68 0.78 1.07 0.79 0.32

-9.61M -14.17M -14.81M -13.57M -14.90M

2086.00 2100.00 2117.00

2.07 1.78 1.78

345.10 342.26 342.00

1739.77 1753.76 1770.75

918.71 918.83 918.98

-5.04 -4.58 -4.08

-918.85 -918.99 -919.15

918.87 919.00 919.16

269.69 269.71 269.75

0.35 0.65 0.01

-17.74M -18.00M 0.00M

Survey Type: Raw Survey

Survey Error Model: SLB ISCWSA version 21 *** 3-D 95.00% Confidence 2.7955 sigma Surveying Prog: MD From ( m ) MD To ( m ) EOU Freq Survey Tool Type 0.00 2117.00 Act-Stns SLB_MWD-STD

*Italicized stations are NOT used in position calculations.

SurveyEditor Ver 3.1RT-SP3.03-HF5.00 Contrapozo Bld( do31rt-546 C\Agua ) Fria 792\Agua Fria 792\Surveys Agua Fria 792 Generated 11/3/2005 8:34 AM Page 2 of 2

OFICIO DE LA  TERMINACION DEL POZO

ESTADO MECANICO FINAL

BASES DE USUARIO PARA LA REPARACION MAYOR

BASES DE USUARIO PARA SOLICITAR SERVICIO DE REPARACIÓN MAYOR CON EQUIPO DEL POZO

AGUA FRIA-792

Agosto 2009

AGUA FRIA 792 PAG: 2

DE: 8

BASES DE USUARIO PARA SOLICITAR SERVICIO DE REPARACIÓN MAYOR CON EQUIPO DEL POZO AGUA FRIA 792

CONTENIDO 1. NOMBRE DEL POZO 2. OBJETIVO 3. UBICACIÓN 4. INFORMACIÓN DEL POZO A INTERVENIR 5. PROPUESTA DE DISPAROS POR INTERVALO 6. DISEÑO DE ESTIMULACIONES 7. SECUENCIA OPERATIVA 8. COSTOS ESTIMADOS DE LA INTERVENCIÓN 9. SEGURIDAD Y ECOLOGÍA

AGUA FRIA 792 PAG: 3

DE: 8

REGIÓN: Norte

PEMEX EXPLORACIÓN Y PRODUCCIÓN.

ACEITE TERCIARIO DEL

ACTIVO: GOLFO

BASE DE USUARIO PARA SOLICITAR SERVICO DE REPARACION MAYOR CON EQUIPO 1 NOMBRE DEL POZO Nombre:

AGUA FRIA

Clasificación:

Número:

792

Letra:

07-07-01 Productor de aceite

2 OBJETIVO Especificar claramente las metas a lograr al término del proyecto, incluyendo el número de intervalos a intervenir Incorporar el pozo a producción, aislando el intervalo 1721-1754 m (C-80) para disparar, fracturar y evaluar el intervalo 1664-1690 m (C-60).

3 UBICACIÓN Estado: Puebla Referencia Topográfica

Municipio: Venustiano Carranza Direccional de la plataforma Yate 1. Se ubica a 60.89 m, S 42° 26’ E del pozo Yate-1.

AGUA FRIA 792 PAG: 4

DE: 8

3.1 Pozos terrestres. Altura del terreno sobre el nivel del mar: Coordenadas UTM conductor: Coordenadas UTM objetivos: Coordenadas geográficas del conductor: Coordenadas UTM a la profundidad Total:

111.53 m X =641,815.24 m Y = 2,269,652.99 m X =640,896.09 m Y = 2,269,648.91 m LAT=20º 31’ 17.61” LONG=97º 38’ 23.53”

4 INFORMACIÓN DEL POZO A INTERVENIR 4.1 Registro de las zonas de interés.

C-60

1

C-90

C-85

C-80

Actual

2

AGUA FRIA 792 PAG: 5

DE: 8

4.2. Estado mecánico (gráfico).

PROPUESTO

ACTUAL Árbol de Válv. : 10 ¾” x 7 5/8” x 5 ½” (S-5M) Coordenadas: UTM Plataforma Objetivo X= 641,815.24 m X= 640,896.09 m Y= 2,269,652.99 m Y= 2,269,648.91m

Inició Perf. : 28-May-05 Term. Perf. : 06-Jun-05 Term. Pozo : 30-Ago-05 Iny. Microorg: Nov-08 CCP: Abril-09

Árbol de Válv. : 10 ¾” x 7 5/8” x 5 ½” (S-5M)

99 m

99 m

T.R. 10 3/4”, J-55, 40.5 Lb/pie, BCN Equipo: 534 Cia: Schlumberger E.M.R = 117.18 m E.T. = 111.53 m

504.5 m

504.5 m

T.R. 7 5/8”, J-55, 26.4 Lb/pie, BCN

T.P. 2 7/8”

1640 m

Empacador

1664 m

1

C-60

1710 m

Tapón de arena 1721 m

C-80

1754 m

Disparó: 26-Junio-05 Fracturó: 26-Agosto-05

Disp y Fract. 1690 m

1721 m

C-80

1754 m

Bomba Cavidades Progresivas Rotor Estator N paro 2-7/8” Ancla Antitorque

1760.05 m 1761.25 m 1761.69 m 1762.09 m

Tubo extensión 2-7/8”

1771.36 m

P.I.

2093 m

T.R. 5 1/2 ”, N-80, 17 Lb/pie, BCN

2114 m P.T.=2117 m

P.I.

2093 m 2114 m

T.R. 5 1/2 ”, N-80, 17 Lb/pie, BCN P.T.=2117 m

AGUA FRIA 792 PAG: 6 4.3. No.

Intervalo (m.d.b.m.r.)

1

1664-1690

Características de los intervalos a probar. Formación

Litología

Chicontepec Arenisca y C-60 Lutita

CO2 PPM

4.4. Fecha

DE: 8

Hidrocarburo

Producción (bpd/mmpcd)

TIPO DE RESERVA

Aceite

50 bpd

PRB

H2S PPM

Porosidad (%)

Permeabilidad (md)

8.0

1.0

Temperatura Presión (°C) (psi)

Saturación de agua (%) 35.0

Últimos datos disponibles de presión y producción del intervalo actual.

Estrangulador (pg)

Presión TP (psi)

Presión de línea (psi)

Abril-09

Gastos Aceite (bpd)

Gas (mmpcd)

Agua (bpd)

5.0

0.02

1.0

5 PROPUESTA DE DISPAROS POR INTERVALO

Diámetro de pistolas

Densidad (cargas/m)

Fase (grados)

Técnica de disparo

2-1/8”

13

60

En balance ó bajo balance

6 DISEÑO DE ESTIMULACIONES TIPO DE ESTIMULACIÓN: Fracturamiento Hidráulico.

Observaciones

Observaciones C-80 reservas recuperables drenadas

AGUA FRIA 792 PAG: 7

DE: 8

7 SECUENCIA OPERATIVA No.

Descripción de la operación

1

Instalar equipo, probar C.S.C. hasta ok.

2

Controlar el pozo con fluido de densidad adecuada para no dañar el yacimiento.

3

5

Retirar aparejo de CP del pozo. Colocar y probar tapón de arena a 1710 m para aislar el intervalo disparado 1721-1754 m (C80). Bajar TP 2 7/8” con empacador a 1640 m.

6

Calibrar TP 2 7/8”, verificar profundidad interior y desmantelar equipo.

7

9

Disparar el intervalo 1664-1690 m (C-60) con pistolas BHDP 2-1/8”, 13 CPM, fase 60°. Si el pozo fluye o manifiesta presión, tomar información, analizar y definir fracturamiento hidráulico. En caso contrario realizar prueba de inyectabilidad y continuar con el siguiente punto. Realizar fractura hidráulica al intervalo 1664-1690 m (C-60), de acuerdo a diseño.

10

Realizar limpieza post-fractura, de ser necesario llevar a cabo inducción.

11

Medir y evaluar. Con equipo se instalará sistema artificial de producción conforme a diseño de la BDU complementaria.

4

8

12

AGUA FRIA 792 PAG: 8

DE: 8

8 COSTOS ESTIMADOS DE LA INTERVENCIÓN 8.1 La compañía deberá entregar sus costos por la intervención 9 SEGURIDAD Y ECOLOGÍA La compañía deberá presentar su política de seguridad y medio ambiente de acuerdo al lineamiento del SSPA Asimismo, deberá cumplir con los términos y condicionales establecidos en el resolutivo emitido por SEMARNAT.

MEMORIA DESCRIPTIVA  PARA EL PERMISO DE LA REPARACION MAYOR REPARACION MAYOR  (SENER)