Eurydice Elevations 2

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Eurydice Elevations 2 as PDF for free.

More details

  • Words: 144
  • Pages: 1
9'-0"

6'-0"

WINDOW CAN BE MADE OF PLEXI BRACING CAN BE MADE OF MASONITE OR ANYTHING ELSE HANDY

CHAIN LINK

CHAIN LINK

3'-0"

3'-0"

BENCH PLAN VIEW

WINDOW SEE MODEL FOR CLARIFICATION

3'-0"

1'-6"

CORRUGATED METAL

ADDITIONAL BRACING MAY BE ADDED AS NECESSARY

ELEVATOR DIAL CUT OUT OF LUAUN AND PAINTED

CHAIN LINK

BENCH FRONT ELEVATION

CORRUGATED METAL WRAPPED AROUND BACK AND SR SIDE

WATER PUMP PLAN VIEW

PUMP IS A RECTANGULAR BOX W/OVERHANG AT TOP AND TROUGH AT BOTTOM LINED IN POND LINER TO HOLD WATER HANDLE OF PUMP NEEDS TO MOVE, BUT IT DOES NOT NEED TO MAKE WATER COME OUT

WILLIAM INGE THEATRE

TREE WATER PUMP FRONT ELEVATION

WILL BE PLUCKED FROM NATURE NOTHING NEEDS TO BE BUILT

PLATE

3 OF 3

EURYDICE ELEVATIONS AND CONSTRUCTION DETAIL DESIGNED BY: LIZ BANKS NOVEMBER 5, 2008 UNIVERSITY OF KANSAS SCALE 1" = 1'

Related Documents

Eurydice Elevations
June 2020 7
Eurydice Elevations 2
June 2020 3
Eurydice Elevations
June 2020 8
Eurydice
November 2019 6
Total Elevations
June 2020 5
Eurydice Groundplan
June 2020 6