LIST IS DEVELOPED BY JWIL ENGINEERING TEAM
Equipment List Sr.N o.
Particuler
1
INTAKE
2
3
4
Capacity Head
1 Pump
1000m3/hr.
2 EOT Crane
10T
126
QTY. W S T 5
1
6
1
0
1
3 Desilting Pump
1
1
4 Dewatering Pump
1
1
5
1
6
1
0
1
3 Desilting Pump
1
1
4 Dewatering Pump
1
1
4
1
5
1
0
1
3 Desilting Pump
1
1
4 Dewatering Pump
1
1
4
1
5
1
0
1
1
1
INTERMEDIATE - 1 1 Pump
1000m3/hr.
2 EOT Crane
10T
126
INTERMEDIATE - 2 1 Pump
1000m3/hr.
2 EOT Crane
10T
113
INTERMEDIATE - 3 1 Pump
1000m3/hr.
2 EOT Crane
10T
3 Desilting Pump
113
4 Dewatering Pump
1
1
ELECTRICAL EQUIPMENT LIST 1 2 3 4 5 6 7
6.6 KV, 3000 KVA TRANSFORMER 6.6 KV, 1250 KVA TRANSFORMER 415 V, 250 KVA LT TRANSFORMER 6.6 KV, HT PANEL 415 V, LT PANEL 6.6 KV, HT CAPACITOR PANEL 6.6 KV, HT SOFT STARTER
4
4
8
2
-
2
4
4
8
4
-
4
4
-
4
18
4
22
18
4
22
8 9 10
11
12
6.6 KV, 520 KW, HT MOTOR UPS POWER DISTRIBUTION BOARD AC DISTRIBUTION BOARD BATTERY (55 CELLS IN EACH PUMP HOUSE)
18
4
22
4
-
4
4
-
4
4
-
4
4
-
4
Instrumentation EQUIPMENT LIST 1
Level Transmitter
8
-
8
2
Level Switch
12
-
12
3
Pressure Switch
18
4
22
4
-
4
18 4 4 4 1
4 -
22 4 4 4 1
4 5 6 7 8 9
Pressure Transmitter Pressure gauge Flow Transmitter Control Panel PLC SCADA