NOTES:
BUILDING SURVEYING DEPARTMENT, FACULTY OF THE BUILD ENVIRONMENT, UNIVERSITY OF MALAYA, 50630 KUALA LUMPUR. SUBJECT:
10
9
8B
8
6B
7
5A
5C
4D
3
4
2B
2
BSES 2208 BUILDING MEASUREMENT AND ANALYSIS
1
9A 37850 21810 2451
4613
3405
2783
6717
2718
2782
3405
4613
3405
800 4475 3410 925
PROJECT:
1488
1837
c.center GF ceiling level
5965
hall2,VIP room ceiling level c.center store roof level
2050
ROOF DETAILS 3mm iron wood shingles roof covering, complete with ridge cover and accessory.
110mm thick brick wall with 20mm cement plaster, emulsion paint finishes for both sides.
17590
main hall ceiling level c.center roof level hall2, VIP room roof level
925
2609
2756
main hall roof level
GROUP 3: 1. HAZREEL HIZAD HASMADI (BEB060012) 2. FAUZIAH ANUAR (BEB060010) 3. MOHD QISTI HUSIN @SHAABAN (BEB060023) 4. MOHD NOR AZIM RIDZUAN (BEB060053) 5. MUHAMMAD NOOR ZAKI ISA (BEB060026) 6. NADHIRAH MOHD MUHIYUDDIN (BEB060030) BUILDING MEASUREMENT AND ANALYSIS FOR AULA TIMUR BUILDING, BANDUNG INSTITUTE OF TECHNOLOGY, BANDUNG, INDONESIA.
790
FL : 0.000 GROUND LEVEL
790
FL : 0.790 MEZZANINE LEVEL
440mm Ø rubble column made with river stone bonded with cement mortar (1:3)
TITLE:
EAST ELEVATION
EAST ELEVATION SCALE 1:200
SCALE:
1:200
DRAWN BY:
CHECKED BY:
DATE:
FILE:
MUHAMAD NOOR ZAKI ISA
26 JUNE 2008
ITBAT/A3/ARC/EAST
DRAWING NO:
BSES2208/ITBAT/A3/ARC/05-08