Draft Materi Meeting Maintenance Program Pembangkit, Distribusi, dan Transmisi PLTU PAMA-1 EPN 14 – 15 Maret 2019

Point of Meeting 1. Persiapan pelaksanaan maintenance planning dan pendukung yang perlu dipersiapkan 2. Persiapan implementasi SERP (RCM untuk PLTU dan distribusi) 3. Penyusunan Maintenance Management System untuk mendukung kedua point di atas 4. Persiapan training & development (OJI distribusi & pembangkit, in class training, dan penyusunan standar kompetensi)

On-Going Process for Maintenance Fullfilment Agenda

Area Pembangkit Distribusi

Identifikasi aset

Pembangkit Distribusi Pembangkit

Asesemen lapangan

Distribusi Pembangkit Distribusi Pembangkit

Praktik maintenance Distribusi dengan panduan dari PJIS dan KE Pembangkit Distribusi Pembangkit Penyusunan SERP (System Equipment Distribusi Reliability Pembangkit Prioritization) Distribusi Pembangkit Pengembangan kompetensi manpower maintenance pembangkit

Distribusi

Penjelasan Klasifikasi peralatan berdasarkan fungsinya

PIC

Status Closed Closed

Perincian peralatan dari tahap island - sistem subsistem - peralatan - komponen

Closed

Pembelajaran cara kerja pembangkit dan distribusi secara keseluruhan, per island, per sistem, dan masing - masing peralatan Pengelompokan manpower berdasarkan island/area, dan bidang kerja (mekanikal, elektrikal, dan instrumentasi)

Closed

Semua aktifitas maintenance di pembangkit dan distribusi berdasarkan arahan dari PJIS dan KE Bertujuan untuk mempelajari cara kerja peralatan, dan filosofi dasar maintenance di pembangkit dan distribusi Program untuk menentukan aktifitas maintenance untuk jangka setahun berdasarkan kehandalan masing - masing peralatan Pengadaan infrastruktur (dokumen dan peralatan) untuk kelengkapan penyusunan SERP Mapping kompetensi manpower maintenance di pembangkit dan distribusi

Pembangkit Distribusi Pembangkit Distribusi

Penyusunan training berdasarkan hasil mapping kompetensi

Pembangkit

Pengembangan kompetensi khusus untuk planner dan engineer agar sesuai dengan SERP

Distribusi

Keterangan tambahan

OJI dan In-class training

Closed Closed Closed Closed OnGoing OnGoing OnGoing OnGoing OnGoing Open OnGoing Open OnGoing OnGoing Open Open Open Open Open Open

On-Going Process for Maintenance Fullfilment

Agenda

Area Pembangkit Distribusi

Pelaksanaan planned Pembangkit maintenance Distribusi program (preventive maintenance) Pembangkit Distribusi

Penjelasan

Keterangan tambahan

PIC

Status

Penyusunan kelengkapan (hourmeter, dokumen teknis, tools, sarana, dll) untuk running planned maintenance program Preventive program dilakukan per interval harian, mingguan, bulanan, 3 bulanan, 6 bulanan, dan tahunan

Open

Preventive program disusun berdasarkan acuan dari equipment serupa yang sudah terdapat di PAMA, dan referensi eksternal untuk equipment yang tidak tersedia di PAMA

OnGoing

Pembangkit

Open Open Open

OnGoing Open

Penyusunan makro proses, SOP, dan INK Distribusi Penyusunan Pembangkit Maintenance Management System Distribusi untuk pembangkit Pembangkit Distribusi Standarisasi struktur Pembangkit organisasi, kompetensi, dan jenjang karir di Distribusi maintenance Pembangkit pembangkit Distribusi Eksekusi SERP

KitDis

Open Penyusunan STD untuk parameter masing - masing aktifitas maintenance Monitoring periodik (harian, mingguan, dan bulanan) untuk KPI aktifitas maintenance dan sistem PI CA/PA (Problem Identification and Corrective/Preventive Action) nya Pemenuhan kebutuhan manpower berdasarkan requirement fungsi kerja di pembangkit dan distribusi Standarisasi kompetensi, fungsi kerja, dan jenjang kerja Pelaksanaan aktifitas maintenance berdasarkan SERP yang telah disusun selama 2019 dengan kompetensi manpower yang telah dikembangkan

Open

Open Open Open OnGoing OnGoing Open Open Open

Identifikasi Aset EPN

Sistem Pembangkit (PLTU 2x 15 MW)

AREA

ISLAND

SYSTEM

BTG Island

Coal Island

Sistem Distribusi (SUTT 36kV)

Water Island

Primary

Sistem Transmisi (SUTT 150 KV)

Secondary

Boiler System

Coal Handling System

Water Intake

Current Carrying

Protection

Turbine System

Ash Handling System

Water Treatment Plant

Insulation

Sarana monitoring & pemeliharaan

Steam Generator System

Limestone Handling System

Waste Water Treatment Plant

Structure

Cooling System

Junction

Fuel Injection System

Fire Fighting System

Sub - System

Equipment Component

Construction progress

System Equipment Reliability Prioritization (SERP)

Metode SERP diperlukan agar proses maintenance pada PLTU dan distribusi bisa lebih tepat guna, dan tidak menimbulkan dampak downtime yang terlalu besar. Pelaksanaannya dilakukan oleh maintenance planner dan maintenance engineer

System Equipment Reliability Prioritization (SERP) Island

System

Sub-System

BTG

Boiler System

BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG

Steam Generator System Steam Turbine System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System

Boiler Unit Steam Turbine Generator Turbine Unit Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries

BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG BTG

Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Steam Turbine System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Boiler System Steam Turbine System Steam Turbine System

Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Turbine Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Boiler Auxilliaries Turbine Auxilliaries Turbine Auxilliaries

Equipment

OC

PT

PQ

SF

RC

PE

SCR

OCR

ACR

AFPF

MPI

Circulating fluidized bed boiler

9

8

10

5

6

1020,14944

10201,4944

81611,955

Steam Turbine Generator Steam Turbine Drain tank sampling cooler Superheated steam sampling cooler Saturated steam sampling cooler Boiler water sampling cooler Feed Water sampling cooler Chimney Duplex slag cooler Weighing complete shut-off coal feeder High Pressure Electric Oil Pump AC Lubricating Oil Pump DC Lubricating Oil Pump High Pressure Heater Low Pressure Heater Gland Steam Heater Flash Tank Equalization Box Temperature-decreased pressure reducer for gland steam heater Condense Pump Water Jet Pump Water Jet Ejector Electric Boiler Feed Water Pump Gland Exhaust Fan Jacking Oil Pump Water Jet Tank Primary Air Fan Secondary Air Fan Induced Draft Fan Recycled Fan Continuous Blowdown Flash tank Periodic blowdown flash tank Vertical type flash tank Drain Tank Drainage pump Service water recycled pump Phospate dosing unit Service water recycled pond Service water recycled tank Oil Tank Emergency Containment Sump

9 9 6 6 6 6 6 8 6 6 7 7 7 7 7 7 7 7

8 8 8 8 8 8 8 6 8 8 8 8 8 8 8 8 8 8

10 10 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

4 2 6 6 6 6 6 6 6 6 2 2 2 2 2 2 2 2

1019,64688 1019,33908 1018,02776 1018,02776 1018,02776 1018,02776 1018,02776 1018,02776 1018,02776 1018,02776 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286

10196,4688 10193,3908 10180,2776 10180,2776 10180,2776 10180,2776 10180,2776 10180,2776 10180,2776 10180,2776 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286

81571,751 81547,126 81442,221 81442,221 81442,221 81442,221 81442,221 81442,221 81442,221 81442,221 81399,428 81399,428 81399,428 81399,428 81399,428 81399,428 81399,428 81399,428

7 7 7 7 7 7 7 7 6 6 6 6 6 6 6 6 6 6 6 6 6 7 7

8 8 8 8 8 8 8 8 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5

2 2 2 2 2 2 2 2 6 6 6 6 6 6 6 6 6 6 6 6 6 2 2

1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,49286 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1017,23369 1016,67333 1016,67333

10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10174,9286 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10172,3369 10166,7333 10166,7333

81399,428 81399,428 81399,428 81399,428 81399,428 81399,428 81399,428 81399,428 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81378,695 81333,867 81333,867

Contoh SERP yang dicoba implementasinya pada sebagian peralatan di PLTU PAMA-1

System Equipment Reliability Prioritization (SERP) Island

System

BTG Coal BTG Water Water

Fuel Firing System Ash Handling System Fuel Firing System Fire Fighting System Fire Fighting System

BTG

Fuel Firing System

BTG

Fuel Firing System

BTG

Fuel Firing System

BTG

Fuel Firing System

BTG

Fuel Firing System

BTG Coal Water Coal Water Water Water

Fuel Firing System Coal Handling System Fire Fighting System Ash Handling System Water Treatment System Water Treatment System Water Treatment System

Water

Water Treatment System

Water

Water Treatment System

Water

Water Treatment System

Water Water Water Water Water

Water Treatment System Water Treatment System Water Treatment System Water Treatment System Water Treatment System

Water Water Water Water Water

Water Treatment System Water Treatment System Water Treatment System Water Treatment System Water Treatment System

Water

Water Treatment System

Sub-System Diesel Generator Fly Hash Handling Diesel Generator Fire Fighting System Fire Fighting System High Speed Diesel System High Speed Diesel System High Speed Diesel System High Speed Diesel System High Speed Diesel System High Speed Diesel System Coal Feeding Fire Fighting System Fly Hash Handling MMF System MMF System MMF System Ultrafiltration (UF) System Ultrafiltration (UF) System Ultrafiltration (UF) System Ultrafiltration (UF) System 1st RO System 1st RO System 1st RO System 1st RO System 1st RO System 2nd RO System 2nd RO System 2nd RO System 2nd RO System Electrodeionization (EDI) System

Equipment

OC

PT

PQ

SF

RC

PE

SCR

OCR

ACR

AFPF

MPI

Black Start Diesel Generator 2x ESP Emergency Diesel Generator Diesel Engine Fire Pump Fire Pressure Stabilizer

7 7 6 6 5

6 4 4 2 2

10 10 10 2 2

5 2 5 9 9

4 6 4 2 2

415,55635 615,52417 414,45683 813,89244 813,49074

10155,5635 10155,2417 10144,5683 10138,9244 10134,9074

81244,508 81241,934 81156,547 81111,396 81079,259

Gear Oil Drain Pump

6

6

6

5

4

412,84523

10128,4523

81027,619

2x Screw Oil Pump

6

6

6

5

4

412,84523

10128,4523

81027,619

Vertical Type Fuel Oil Filter

6

6

6

5

4

412,84523

10128,4523

81027,619

2x Vertical Type Fuel Oil Filter

6

6

6

5

4

412,84523

10128,4523

81027,619

Fuel Day Tank

7

4

4

5

4

411,74734

10117,4734

8939,7872

Oil Tank 4x Coal & Silica Belt Feeder Motor Driven Fire Pump 2x Pneumatic ash transporter 2xMulti Medium Mechanical Filter (MMF) Backwash Pump Water Tank for MMF Backwash Water Tank for MMF

6 5 5 7 8 8 8

4 4 2 4 4 4 4

4 10 2 6 4 4 4

5 2 9 2 2 2 2

4 2 2 6 2 2 2

411,18034 613,60147 813,49074 613,30413 812,96148 812,96148 812,96148

10111,8034 8108,8118 8107,9259 8106,4331 8103,6919 8103,6919 8103,6919

8894,4272 8870,4941 8863,4072 8851,4646 8829,5348 8829,5348 8829,5348

Ultra Filtration (UF) Device

8

4

4

2

2

812,96148

8103,6919

8829,5348

Reducing Agent & Scale Inhibitor

8

4

4

2

2

812,96148

8103,6919

8829,5348

Backwash UF Water Pump

8

4

4

2

2

812,96148

8103,6919

8829,5348

2x UF Water Pump 1st Reverse Osmosis (RO) Filter System 2x 1RO Filter 2x Pump Motor 1RO 4x Electric Actuator 1RO 2x Supply Water Pump for 2nd RO Filter System 2nd Reverse Osmosis (RO) Filter System 2x 2RO Filter 2x Pump Motor 2RO 4x Electric Actuator 2RO

8 8 8 8 8

4 4 4 4 4

4 4 4 4 4

2 2 2 2 2

2 2 2 2 2

812,96148 812,96148 812,96148 812,96148 812,96148

8103,6919 8103,6919 8103,6919 8103,6919 8103,6919

8829,5348 8829,5348 8829,5348 8829,5348 8829,5348

8 8 8 8 8

4 4 4 4 4

4 4 4 4 4

2 2 2 2 2

2 2 2 2 2

812,96148 812,96148 812,96148 812,96148 812,96148

8103,6919 8103,6919 8103,6919 8103,6919 8103,6919

8829,5348 8829,5348 8829,5348 8829,5348 8829,5348

EDI Device

8

4

4

2

2

812,96148

8103,6919

8829,5348

Contoh SERP yang dicoba implementasinya pada sebagian peralatan di PLTU PAMA-1

System Equipment Reliability Prioritization (SERP) Island

System

Sub-System

Equipment

Water Water Water Water Water Water Coal Water Water Water Water Water Water Water Water Coal Water Water Water Coal Water Coal Coal Water Water

Water Treatment System Water Treatment System Water Treatment System Water Treatment System Water Treatment System Water Treatment System Ash Handling System Cooling Water System Cooling Water System Cooling Water System Cooling Water System Cooling Water System Cooling Water System Cooling Water System Cooling Water System Ash Handling System Water Intake System Water Treatment System Water Treatment System Coal Handling System Cooling Water System Ash Handling System Ash Handling System Cooling Water System Cooling Water System

Electrodeionization (EDI) System Cleaning System MMF System MMF System Cleaning System Cleaning System Fly Hash Handling BOP Cooling BOP Cooling BOP Cooling BOP Cooling BOP Cooling BOP Cooling BOP Cooling BOP Cooling Fly Hash Handling Clarifiying Device Raw Water Circulation Deareator Coal Preparation Condensor Cooling Bottom Ash Handling Bottom Ash Handling Condensor Cooling Condensor Cooling

Coal Water Water Coal Coal Coal Coal Coal Coal Water Water Water Coal Coal Coal Water Water Coal Coal Water Water Water Water Water

Ash Handling System Water Intake System Water Intake System Coal Handling System Coal Handling System Coal Handling System Coal Handling System Coal Handling System Ash Handling System Water Intake System Water Intake System Water Intake System Coal Handling System Coal Handling System Lime Handling System Cooling Water System Cooling Water System Ash Handling System Coal Handling System Waste Water Treatment Plant Waste Water Treatment Plant Waste Water Treatment Plant Water Treatment System Water Treatment System

Bottom Ash Handling River Intake Clarifiying Device Coal Preparation Coal Preparation Coal Preparation Coal Preparation Coal Preparation Bottom Ash Handling River Intake River Intake Clarifiying Device Coal Preparation Coal Preparation Lime Handling System Cooling Tower Cooling Tower Fly Hash Handling Coal Feeding Sewage treatment Ash Water Treatment Oil Water Treatment MMF System MMF System

Water

Water Treatment System

Ultrafiltration (UF) System UF Water Tank

2x Desalination Water Pump Cleaning System Water Pump Flocculent & Antiseptic Device 2x Security Filter Cleaning System Ammonia Device compressor Feedpump Cooling Water Admitting Pipeline Feedpump Cooling Water Return Pipeline Primary Cooling Water Admitting Pipeline Primary Cooling Water Return Pipeline Secondary Cooling Water Admitting Pipeline Secondary Cooling Water Return Pipeline IDF Cooling Water Admitting Pipeline IDF Cooling Water Return Pipeline Refrigerated compressor air dryer 3x Make Up Water Pump Raw Water Pump 2x Deareator Unit Coal Crusher Condenser No. 1 Scraper Conveyor No. 3 Scraper Conveyor Air Cooler Oil Cooler Slag Silo 2x Intake Sump Clarifier Unit Belt Conveyor 1 Belt Conveyor 2a Belt Conveyor 2b Belt Conveyor 3a Belt Conveyor 3b No.2 Bucket Elevator Water River Intake 2x Primary Supply Water Pump Chlorine Dioxide Generator Grab Crane Vibrating Feeder Limestone Silo (2 Unit) Cooling Tower 5x Circulating Water Pump Gasification device 4x Coal Bunker

Air Tank 1 Air Tank 2

OC

PT

PQ

SF

RC

PE

SCR

OCR

ACR

AFPF

MPI

8 8 8 8 8 8 5 6 6 6 6 6 6 6 6 4 6 6 8 6 7 6 6 6 6

4 4 2 2 2 2 4 2 2 2 2 2 2 2 2 4 4 4 6 4 6 4 4 4 4

4 4 4 4 4 4 6 6 6 6 6 6 6 6 6 6 4 4 8 6 8 6 6 6 6

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 2 6 2 2 2 2 2 2 2 2 6 2 2 2 2 2 6 6 2 2

8 8 8 8 8 8 6 8 8 8 8 8 8 8 8 6 8 8 8 6 8 6 6 8 8

12,96148 12,96148 12,49 12,49 12,49 12,49 12,36932 12,16553 12,16553 12,16553 12,16553 12,16553 12,16553 12,16553 12,16553 12 11,83216 11,83216 15,36229 11,48913 14,86607 12,80625 12,80625 12,64911 12,64911

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 6 8 6 6 6 6 6

103,6919 103,6919 99,91997 99,91997 99,91997 99,91997 98,95454 97,3242 97,3242 97,3242 97,3242 97,3242 97,3242 97,3242 97,3242 96 94,65728 94,65728 92,17375 91,913 89,19641 76,83749 76,83749 75,89466 75,89466

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

829,5348 829,5348 799,3597 799,3597 799,3597 799,3597 791,6363 778,5936 778,5936 778,5936 778,5936 778,5936 778,5936 778,5936 778,5936 768 757,2582 757,2582 737,39 735,304 713,5713 614,6999 614,6999 607,1573 607,1573

4 6 6 6 6 6 6 6 6 6 6 5 4 4 8 8 7 6 6 6 6 8 8

4 4 4 4 4 4 4 4 4 2 2 2 4 4 4 6 4 4 4 2 2 2 2 2

6 4 4 6 6 6 6 6 6 4 4 4 6 6 6 8 8 6 8 4 4 4 4 4

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

6 2 2 2 2 2 2 2 6 2 2 2 2 2 2 2 2 6 2 6 6 6 2 2

6 8 8 6 6 6 6 6 6 8 8 8 6 6 6 8 8 6 6 8 8 8 8 8

12 11,83216 11,83216 11,48913 11,48913 11,48913 11,48913 11,48913 11,31371 11,31371 11,31371 11,31371 11 10,58301 10,58301 15,36229 14,69694 13,30413 12,64911 12,64911 12,64911 12,64911 12,49 12,49

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 4 4 4 4 4 4 4 4 4

72 70,99296 70,99296 68,93475 68,93475 68,93475 68,93475 68,93475 67,88225 67,88225 67,88225 67,88225 66 63,49803 63,49803 61,44917 58,78775 53,21654 50,59644 50,59644 50,59644 50,59644 49,95998 49,95998

8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8

576 567,9437 567,9437 551,478 551,478 551,478 551,478 551,478 543,058 543,058 543,058 543,058 528 507,9843 507,9843 491,5933 470,302 425,7323 404,7715 404,7715 404,7715 404,7715 399,6799 399,6799

8

2

4

2

2

8

12,49

4 49,95998

8 399,6799

System Equipment Reliability Prioritization (SERP) Island

System

Water

Water Treatment System

Water Coal Water Water Coal Coal Water Water Coal Coal Coal Coal Coal Coal Coal

Water Treatment System Coal Handling System Water Intake System Water Treatment System Coal Handling System Ash Handling System Water Intake System Cooling Water System Coal Handling System Coal Handling System Coal Handling System Coal Handling System Coal Handling System Coal Handling System Coal Handling System

Sub-System

Equipment

OC

1st RO System Fresh Water Tank Electrodeionization (EDI) System 2x Demin Water Tank Coal Feeding 4x Silica Sand Bunker Clarifiying Device Chemical dosing pump of Antiscalant Raw Water Circulation Raw Water Tank Coal Preparation 2x5 Dust Collector System Bottom Ash Handling Upper Structure - (C02) Bottom Ash Bin River Intake House Drainage Pump Cooling Tower Electrical Hoist Coal Preparation Electromagnetic Separator Coal Preparation Belt Scale Coal Preparation Underground Coal Hopper Coal Preparation Electric Hoist Coal Preparation Electric Hoist Coal Preparation Chute A Coal Preparation Chute B

PT

PQ

SF

RC

PE

SCR

OCR

ACR

OC

Operating Cost

PT Process Troughput PQ SF RC PE SCR

Product Quality Safety Consideration Regulatory Compliance Plant Efficiency System Criticality Ranking

4

2

2

8

12,49

4 49,95998

8 399,6799

8 5 6 6 5 8 6 6 4 4 5 4 4 4 4

2 4 2 2 4 2 2 2 4 4 2 2 2 2 2

4 8 4 4 6 6 4 2 6 6 2 2 2 2 2

2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

2 2 2 2 2 6 2 2 2 2 2 2 2 2 2

8 12,49 6 12,20656 8 11,31371 8 11,31371 6 11 6 13,41641 8 11,31371 8 10,77033 6 10,58301 6 10,58301 6 8,774964 6 8,246211 6 8,246211 6 8,246211 6 8,246211

4 49,95998 4 48,82622 4 45,25483 4 45,25483 4 44 2 26,83282 2 22,62742 2 21,54066 2 21,16601 2 21,16601 2 17,54993 2 16,49242 2 16,49242 2 16,49242 2 16,49242

8 399,6799 8 390,6098 8 362,0387 8 362,0387 8 352 8 214,6625 8 181,0193 8 172,3253 8 169,3281 8 169,3281 8 140,3994 8 131,9394 8 131,9394 8 131,9394 8 131,9394

Source of Data

Keterangan Requirement for Data Source Nilai bisa berubah apabila terdapat penggantian Capital Investment tipe aset Data Investasi / Data procurement FMEA, Data daily breakdown yang Daily Breakdown report / menjelaskan dampak kerusakan KPI Nilai bisa berubah sesuai kondisi operasional terhadap produksi listrik pada PLTU Data operasi PLTU (DCS) / KPI Nilai bisa berubah sesuai kondisi operasional Rekapitulasi data operasional dari DCS Nilai bisa berubah apabila ada risk assesement Data Hazops yang disesuaikan dengan HAZOPS ulang FMEA UU, RKL/RPL, laporan Nilai bisa berubah apabila terdapat peraturan / limbah perizinan baru Data peraturan dan perizinan Data operasi PLTU (DCS) / KPI Nilai bisa berubah sesuai kondisi operasional Rekapitulasi data operasional dari DCS Kalkulasi Nilai bisa berubah sesuai hasil kalkulasi OC, PT, PQ, SF, RC, PE

OCR

ACR AFPF MPI

Operational Criticality Ranking Asset Criticality Ranking Asset Failure Probability Factor Maintenance Priority Index

FMEA, Data operasi PLTU (DCS) Kalkulasi Daily Breakdown report / KPI Kalkulasi

Nilai bisa berubah sesuai kondisi operasional / risk assesement ulang Nilai bisa berubah sesuai hasil kalkulasi Nilai bisa berubah sesuai kondisi operasional Nilai bisa berubah sesuai hasil kalkulasi

MPI

2

Parameter SERP Parameter Description

AFPF

8

FMEA, Daily breakdown yang menjelaskan dampak kerusakan terhadap sistem induk, dan rekapitulasi data operasional dari DCS SCR, OCR Daily breakdown report dan KPI maintenance ACR, AFPF

Formula

System Equipment Reliability Prioritization (SERP) Proses aktualisasi SERP dari konsep menjadi maintenance planning Maintenance Strategy • •

Logic Tree Analysis (untuk menentukan aktifitas maintenance yang sesuai kondisi)



Work Planning & Control

Asset Wellness (KPI)

Planning Maintenance Maintenance Preparation Maintenance execution control

Root Cause Analysis (TAR, untuk menentukan penyebab kerusakan)

Continous Improvement

Manpower Development

- Materi di tim PPD HO (Ari Oksendra) -

Eksekusi Preventive Maintenance Planning Maintenance Activities Equipment by Island & System BTG Black Start Diesel Generator BOILER & AUX. CONDENSATE SYSTEM CONDENSOR SYSTEM DEAREATOR SYSTEM ELECTROSTATIC PRECIPITATOR SYSTEM ELECTROSTATIC PRESIPITATOR SYSTEM High Speed Diesel System TURBINE & AUX COAL BOTTOM ASH HANDLING COAL HANDLING PLANT FLY ASH HANDLING SYSTEM WATER COOLING SYSTEM FIRE FIGHTING SYSTEM WTP

Interval of activities Everyday Every week Every month Every 2000 hrs Every 4000 hrs Every 6000 hrs Every 8000 hrs 392 127 157 1210 585 102 448 7 6 2 32 141 15 43 282 62 2 75 10 10 10 47 47 10 36 9 9 9 68 19 9 9 3 3 3 16 22 3 3 4 1 90 8 8 21 3 2 56 2 208 80 84 647 425 78 282 74 22 28 191 41 19 51 37 10 6 74 22 28 118 29 19 43 36 2 2 148 20 18 382 10 8 46 36 1 1 92 1 1 1 52 14 9 128 5 3 35 60 5 8 162 4 4 10

Planning Maintenance Activities Equipment by Level of inspection and System Inspeksi Level 1 Climb Up Inspection Current Cariyying / Pembawa Arus Insulator / Isolasi Junction Monitoring Protection ( Proteksi Petir ) Structure Ground Patrol Current Cariyying / Pembawa Arus Junction Monitoring Pengaman dari Ancaman Akibat Manusia Protection ( Proteksi Petir ) Structure Inspeksi Level 2 ( In Service Measurement ) Pentanahan ( Grounding ) Pentanahan ( Grounding ) Puncture test Puncture test Ranging Meter Ranging Meter Thermovisi Thermovisi TLA TLA Inspeksi Level 3 ( Shutdown Testing Measurement) Current Carrying Current Carrying Insulation / Isolasi Insulation / Isolasi Structure Structure

Interval of Activities Daily Weekly Monthly 3-monthly 6-monthly yearly every 2 year every 5 year Conditional 38 2 3 50 50 50 50 4 4 4 4 14 14 6 6 14 14 8 8 38 2 3 8 3 5 2 2 12 1 8 2 5 2 1 12 2 2 1 1 1 1 4 4 5 5 5 5 2 2 4 1 1 2 2 1 1

Schedule aktifitas maintenance pembangkit berdasarkan interval untuk masing – masing sistem

Schedule aktifitas maintenance distribusi berdasarkan interval untuk masing – masing sistem

Rincian planned maintenance berisi : • masing – masing aktifitas rinci per equipment per interval waktu • Standar parameter nilai normal masing – masing aktifitas (STD)

Eksekusi Preventive Maintenance Koordinasi dengan OPR

Fasilitas

Tools

Spare Parts

Dokumen Pendukung

Pengarahan

Durasi maintenance

Crane

Alat pengukuran

Replaceable equipment

INK

OJI with expert trainer / consultant

Equipment terkait

Welding

Special tools

Lubricants

QA/QC

?

Dampak produksi listrik

A2B

Workshop Tools

Consumable parts

Operational Data reference

?

?

?

?

?

Working Order ?

Bagian Koordinasi

Fasilitas

Tools

Spare Parts

Rincian Durasi maintenance Equipment terkait Dampak produksi listrik Lifting Equipment Welding equipment A2B Alat pengukuran Regular & Special Tools Workshop Tools Replacable Equipment Lubricants Consumable Parts Spare Parts

Document

Instruksi Kerja (INK) QA / QC Guidance Operasional Data Reference Working Order

Pengarahan

OJI with expert trainer

Penjelasan

Action

Notes

Parameter – parameter yang perlu disiapkan dalam eksekusi preventive maintenance

PIC

ELECTRICITY (Generation & Distribution) Maintenance Management System

Agar aktifitas maintenance dapat terencana, terawasi, dan mencapai target yang diinginkan, diperlukan sistem manajemen yang dapat mengakomodir keperluan perencanaan, eksekusi, monitoring target, feedback, dan pengembangan terhadap aktifitas maintenance beserta elemen pendukungnya.

ELECTRICITY (Generation & Distribution) Maintenance Management System

PLANT DIVISION SCOPE Electricity Operation by EPN

• Electricity Generation (PLTU 2 x 15 MW) • Electricity Distribution (Distribusi 36 kV to ASMI, SMMS, TOP) • Electricity Transmission (150 kV integration to PLN future plan)

Electricity Operation Maintenance

• Generation equipment maintenance • Distribution Equipment Maintenance • Transmission Equipment Maintenance

EPN SCOPE

Electricity Operation by EPN

• Electricity Generation (PLTU 2 x 15 MW) • Electricity Distribution (Distribusi 36 kV to ASMI, SMMS, TOP) • Electricity Transmission (150 kV integration to PLN future plan)

ELECTRICITY (Generation & Distribution) Maintenance Management System

ELECTRICITY (Generation & Distribution) Maintenance Management System MAINTENANCE MACRO PROCESS Improvement Management

GENERATION & DISTRIBUTION ENGINEERING

OPERATION

SERP Failure Identification

Operation Parameter

Shutdown Maintenance

Maintenance Planning

Performance Analysis

Operation Engineering Maintenance Engineering

Turn On Maintenance

Operation Lifetime

People Development

Recondition Management

Information Management

Facilities & tools management

HCGS

SUPPLY MANAGEMENT

INFORMATION SYSTEM

Plant ASMI

ELECTRICITY (Generation & Distribution) Maintenance Management System MAIN PROCESS Generation & Distribution Planning & Engineering

SOP & STD REQUIREMENT

Operation Coordination

Maintenance Engineering

Maintenance Planning

Maintenance Execution System of Equipment Reliability Prioritization

Shutdown Maintenance

Performane Analysis

Turn On Maintenance

Key Performance Indicator Failure Analysis

SOP yang diperlukan pada Maintenance Management System

SUPPORT PROCESS

SOP & STD REQUIREMENT

Improvement Management

People Development

Recondition Management Information Management

Facilities & Tools Management

STRUKTUR ORGANISASI & STANDAR KOMPETENSI

- Materi di tim PPD HO (Ari Oksendra) -