Doc.

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Doc. as PDF for free.

More details

  • Words: 477
  • Pages: 2
Separate Rules framed for colonizer and other plot holders in a valid licenced colony.

Colonlsor'

. . .

.

~

~

01/\

~

Plans for building having height of more than 60m, structural/fire

r:~

certificate

~n

.

If'T

for Any other person intending to construct building in a ,alid l;concod co Iony to apply <JV' approval of building plans by giving 3 weeks notice.

is conveyed to be applicant. at a

If tho buildingis constructod in contra,ontion to any buildingrogulations, tho aut

?(

~ ,

It shall be treated as 15 days notice for start of construction. Construction can be starte

Any authorized officer reserves the right to check the building plans and construction stage and violation, if found shall have to be rectified.

~

:~I {j;j!

officer shall require the building plans to be altered or demolished by a written notice~!~~ { notice is not complied, the authorized person may demolish the said building at the expense of the owner.

C2f

Occup.ation Certificate:

.

On completion of the building, the owner and architect alongwith affidavit and following documents:

.

to submit completion drawings

Self-assessment of violation; Both the owner and architect to give an Affidavit that no rules have been violated; and Photographs of front, site and rear setbacks and other essential areaS to be submitted.

(i) (ii) (iii)

Competent authority will issue Occupation Certificate required completion drawings, forms and affidavits.

within 10 working days with the

Draft notification yet to be issued by Government. It will be circulated invite objections

and thereafter,

notify the policy. Expected

when received. Government to date of final notification is December

~

end, 2008. *************

J..\~(H) ~

...

~

~ th ~ ~-~

~.~.~

.J

r;~G~

Applicable to all types of buildings.

in case no objection

/I"

~

to be

submitted within 3 months from a reputed institute. No building plans to be entertained, wherein roofs of the ground floor has been casted.

.

,~

Coloniser to apply for approval of building plans by giving 3 weeks notice to DTCP and intimating the date of start of construction with clearance from MOEF &others.

Any other person:

. . . . .

~

~

be..

hoGtJJaalM,

~

'2..~

\ Cb

~~

g..~

~Q..~ ~ ~ ~ ~ ~~J.cB~ '"2..tto~

\0

J-!a

r'O

,..,.

~

~'-1::>~ ~

, ~~

~

DLF ESTATE DEVELOPERS LIMITED SANCTIONING LIMITS (FINANCIAL POWERS) The following financial powers delegation may please be approved for smooth functioning of day to day operations.

DESIGNATION S.NO 1 General Managers /Sr.G.Ms.

EXISTING LIMITS (Rs.) 2,000

PROPOSED LIMITS

2,000

25,000

20,000

100,000

2 Vice Presidents / Sr. V.Ps 3 Executive Directors / Sr.E.D.

(Rs.) 5,000

Note: The above approval limits are only for day to day operational needs of the estate division, / Shopping Mall Complex, for all other expenses, H.G.Policies would be applicable.

~'

N})- }~>

~-

~~.~~.

b~~

~~

~~ /"

Related Documents

Doc Doc Doc !
May 2020 58
Doc
May 2020 29
Doc
June 2020 20
Doc
May 2020 15
Doc
May 2020 15
Doc.
December 2019 22