To All Present Over Here
College of Engineering And Technology, Akola.
THE SOCIETY
,SHRI SHIVAJI EDUCATION SOCIETY AMRAVATI ESTD: 1932
FOUNDER PRESIDENT
SHIKSHAN MAHARSHI AND KRISHI RATNA Late Dr. PANJABRAO ALIAS BHAUSAHEB DESHMUKH. ( 27TH DECEMBER, 1898 – 10TH APRIL, 1965)
POSTAL STAMP IN MEMORY OF Dr. PANJABRAO ALIAS BHAUSAHEB DESHMUKH.
SHRI SHIVAJI EDUCATION SOCIETY AMRAVATI
•TRULY DEMOCRATIC •EXECUTIVE COUNCIL IS ELECTED BY •ELECTIONS EVERY FIVE YEARS
2200 LIFE MEMBERS
SHRI SHIVAJI EDUCATION SOCIETY AMRAVATI TOTAL INSTITUTES 269 WHICH INCLUDE
• • • • • • • • • • • •
ENGINEERING COLLEGE INCLUDING ARCHITECTURE MEDICAL COLLEGE COLLEGE OF EDUCATION COLLEGE OF AGRICULTURE COLLEGE OF FINE ARTS UG & PG COLLEGES Science, Arts And Commerce VOCATIONAL COURSE UNITS RURAL INSTITUTES JUNIOR COLLEGES & M. C. V. C. HIGH SCHOOLS PRIMARY SCHOOLS AND STUDENT HOSTELS
SHRI SHIVAJI EDUCATION SOCIETY AMRAVATI ACHIEVEMENTS
•
DR. BABASAHEB AMBEDKAR DALIT MITRA AWARD ( GOVT. OF MAHARASHTRA)
•
GADGE MAHARAJ SEVA PURASKAR (GADGE MAHARAJ SEVA SANSTHA, MUMBAI)
•
: 1994 : 1998
THE BEST EDUCATION SOCIETY ( GOVT. OF MAHARASHTRA)
: 2000
HON. PRESIDENT SHRI VASANTRAO DHOTRE RECEIVING THE BEST EDUCATION SOCIETY 2000 AWARD AT THE HANDS OF HIS EXCELLANCY SHRI P. C. ALEXANDER HON. GOVERNOR OF MAHARASHTRA
INSTITUTE
SHRI SHIVAJI EDUCATION SOCIETY AMRAVATI’S
COLLEGE OF ENGINEERING AND .TECHNOLOGY, AKOLA AT POST BABHULGAON (Jh), N.H. No. 6, TAL., DIST. AKOLA (M.S.) 444 104
ESTABLISHED IN 1983 AFFILIATED TO
SANT GADGE BABA AMRAVATI UNIVERSITY, AMRAVATI DIST. AMRAVATI PIN: 444 662 STATE : MAHARASHTRA
SELF FINANCING NON – MINORITY NO PHYSICAL, FINANCIAL OR HUMAN RESOURCES ARE SHARED WITH OTHER INSTITUTIONS
WE HAVE WELL DEFINED MISSION, VISION, AIMS, GOALS & OBJECTIVES
COURSES
COURSES COURSE
• • • • • •
STARTED
CHEMICAL ENGINEERING
1983-84
40
ACCREDITED
PRODUCTION ENGINEERING
1983-84
40 ACCREDITED
POLYMER TECHNOLOGY
1983-84
30
TEXTILE ENGINEERING
1984-85
30
CIVIL ENGINEERING
1985-86
40
COMPUTER SCI. & ENGINEERING
2002-03
60
ACCREDITED
T O T A L : 240
ALL COURSES ARE APPROVED BY AICTE
PHYSICAL INFRASTRUCTURE & FACILITIES
AICTE NORMS
BUILT UP AREA LAND INSTRUCTIONAL AREA @ 6 SQ. MTR. PER STUDENT ADMINISTRATIVE AREA 1 SQ. MTR. PER STUDENT AMENITIES 2 SQ. MTR. PER STUDENT SUBTOTAL CIRCULATION & OTHER @ 30 % GRAND TOTAL SQ. MTR. PER STUDENT
AVAILABLE
10 ACRES.
39.7 ACRES
5760
9654.63
960
808.65
1920
2621.66
8640
13084.94
2592
3925.482
11232
17010.42
11.75
17.72
PHYSICAL INFRASTRUCTURE & FACILITIES 10000
1000
AREA AS PER NORMS (SQ. M)
NORMS Vs ACTUAL AREA
AREA ACTUAL AVAILABLE (SQ. M)
864
1475.95 900
400 175 194 100
150
205
160 100
66 73.5 36 36
10
1 CLASS ROOM TUTORIAL AREA (SQ. ROOMS AREA MTR.)
DRAWING HALL AREA
COMPUTER LIBRARY AREA WORK SHOPS CENTRE AREA AREA
CANTEEN
PHYSICAL INFRASTRUCTURE & FACILITIES POWER BACK UP NORM
: 25 KVA
AVAILABLE GENERATOR INVERTER U.P.S.
: 25 KVA : 1 KVA : 3 KVA
PHYSICAL INFRASTRUCTURE & FACILITIES: OTHERS
• • • • • • • • • • • • • •
TOTAL COST OF BOOKS
: Rs. 67 LACS
TRANSPORT
: 2 BUSES (55 SEATER EACH)
INTERNET
: BROAD BAND LINE 2 MbPS
INTRANET
: ALL DEPARTMENTS
EPABX / INTERCOM
: ALL DEPARTMENTS
DISPENSARY DEPARTMENTAL STORES BOYS’ COMMON ROOM GIRLS’ COMMON ROOM OPEN AIR THEATRE GARDEN : ‘D’ LAWN SUFFICIENT DRINKING AND UTILITY WATER SUPPLY ALL WEATHER ROADS SANITATION AND HYGIENE
FACULTY
FACULTY FOR EXISTING COURSE BASIS •
TOTAL NO. OF STUDENTS AS PER SANCTIONED INTAKE 4 X 240 = 960
•
PRINCIPAL
:
REGULAR
STAFF STUDENT RATIO AS PER NORMS 01:15 AVAILABLE 01:14
FACULTY
APPOINTMENT
PROFESSOR
ASTT. PROFESSOR
LECTURER + SR. LECT.
TOTAL
REGULAR
05
11
13+18 = 31
47
ADHOC
01
02
19
22
VISITING
00
00
04
04
FACULTY STAFF STUDENT RATIO : (REGULAR TEACHING ONLY) PROFESSOR ASTT. PROFESSOR LECTCTURER
01:192 01: 87 01: 31 TOTAL : 01: 20
STAFF STUDENT RATIO (REGULAR + ADHOC) PROFESSOR ASSTT. PROFESSOR LECTURER
01:160 01:74 01:22, TOTAL: 01:14
QUALIFICATION
Ph. D. HOLDERS
: 03
M. Phil.
: 03
M.E./M.TECH/OTHER P.G.s
: 20
REGISTERED FOR Ph. D.
: 03
REGISTERED FOR M.E./M.TECH : 06 NO. OF BOOKS PUBLISHED
: 01
CENTRAL COMPUTING FACILITY
COMPUTING FACILITY
NAME: NO. OF PC TERMINAL : NETWORK:
• •
COMPUTER CENTRE 40 ALL ( P-IV) INTRANET OF 100 Mbps INTERNET 2 Mbps BROAD BAND
TOTAL COMPUTER TERMINALS AVAILABLE RATIO 01:04 ORDER FOR NEW TERMINALS PLACED
: 240 : 045
CENTRAL LIBRARY FACILITY
CENTRAL LIBRARY FACILITY SUBSCRIPTION FOR Indest & DelNet AN e-JOURNAL SCHEME OF AICTE SR. NO
PARTICULAR
NUMBERS
1
TOTAL OF STUDENTS IN THE INSTITUTE (2006-2007)
2
READING HALL CAPACITY
3
TOTAL CARPET AREA SQ.MTR.
4
NO. OF TITLES
7060
5
NO. OF BOOKS
14725
6
NO. OF NATIONAL JOURNALS
728 250 NOS. 845 SQ.MTR.
50
CENTRAL LIBRARY FACILITY SR. NO
PARTICULAR
NUMBERS
7
NO. OF INTERNATIONAL JOURNALS
15
8
NON –TECHNICAL JOURNALS
05
TOTAL COST OF : 9
10
A) BOOKS
67,15,098
B) SUBSCRIPTION FOR JOURNALS
1,31,941
COST OF FURNITURE
8,81,500
CENTRAL LIBRARY FACILITY
SR. NO
PARTICULAR
11
XEROX FACILITY IS AVAILABLE
YES
12
INTERNET FACILITY IS AVAILABLE
YES
13
NO OF COMPUTERS AVAILABLE IN THE LIBRARY
14
MULTIMEDIA FACILITY AVAILABLE
15
ANY OTHER AMENITIES PROVIDED TO STUDENTS IN LIBRARY
NUMBERS
P IV (BAND WIDTH): 05 YES AUDIO / VIDEO SECTION
CENTRAL LIBRARY FACILITY
COST JOURNAL OTHERS (LACS) (LACS)
YEAR
TITLE
VOLUME
TOTAL
2004-05
172
589
1.47
1.48
3.00
5.95
2005-06
309
841
3.67
2.43
--
6.10
2006-07
250
937
4.34
0.6
--
4.94
CENTRAL WORKSHOP
CENTRAL WORKSHOP SR. NO.
SHOP
AREA
COST OF EQUIPMENT RS.
1
MACHINE SHOP
341.64 SQ.MTR
2631711.63
2
FITTING SHOP, SMITHY SHOP & FOUNDRY
139.97 SQ.MTR + 30.00
116043.75 70977.25
3
WELDING & CARPENTRY
69.02 SQ.MTR
502560.23 104125.00
TOTAL INVESTMENT MADE ON INFRASTRUCTURE UPTO JAN.2007. (Figure Are In Lacks of Rupees)
BUILDING
: 350.00
HOSTEL
:
95.00
(Transferred by Society to Engineering College)
COMPUTER CENTRE (40 PC ALL P4)
:
10.74
LIBRARY
:
67.00
EQUIPMENT : • Total Investment Till Date (Book Value) • Investment In The Last Financial Year • Investment Proposed For This Year
: 284.00 : 31.75 : 30.00
HOSTEL INTAKE CAPACITY : BOYS -100, GIRLS – 30
AS SEEN FROM ABOVE ON THE APPROVED INTAKE AICTE NORMS FULLFILLED
TARGET DATES FOR START OF ACADEMIC PROGRAMMES
APPEAL AS PER AICTE NEW INSTITUTE CAN BE STARTED WITH 240 INTAKE WITH 04 COURSES, AFTER 06 YEAR OF ESTEBLISHMENT IT CAN BE RECH UPTO 420 WE HAVE 240 INTAKE AFTER 23 YEARS
INSTITUTE HAS IDENTIFIED THE FOLLOWING PROGRAMMES SR. NO.
NAME OF PROGRAMME
INTAKE
TARGET YEAR
NEW PROPOSED (UG): 1.
MECHANICAL ENGINEERING
+60
2007 – 08
2.
ELECTRONICS & TELECOMMUNICATION
+60
2007 – 08
VARIATION IN INTAKE: 3.
COMPUTER SCIENCE & ENGINEERING
60 TO 120 (+60)
2007 – 08
4.
PRODUCTION ENGINEERING
40 TO 30 (-10)
2007 – 08
TOTAL
170
LAND BUILDING
BULDING (AREA IN SQ. M.) PERMANENT SITE EXISTING COURSES BUILT UP AREA FOR 12187 SQ. M. ADDITIONAL BUILT UP AREA MADE AVAILABLE FOR NEW COURSE/ INCREASE IN INTAKE 1621.32 SQ. M.
LIBRARY (PROPOSED PROGRAMME) NUMBER OF TITLES OF THE BOOKS SR. NO
COURSE(S)
NUMBER OF TITLES OF THE BOOKS REQUIRED
AVAILABLE
1.
MECHANICAL ENGINEERING
250
494*
2.
ELECTRONICS & TELECOMMUNICATION ENGINEERING
250
28
3.
COMPUTER SCIENCE & ENGINEERING
250
325
* Including PESAA Library
LIBRARY (PROPOSED PROGRAMME) NUMBER OF VOLUMES SR. NO
NUMBER OF VOLUMES COURSE(S) REQUIRED
AVAILABLE
1.
MECHANICAL ENGINEERING
1000
1423*
2.
ELECTRONICS & TELECOMMUNICATION ENGINEERING
1000
203
3.
COMPUTER SCIENCE & ENGINEERING
1000
1306
* Including PESAA Library
LIBRARY (PROPOSED PROGRAMME) NUMBER OF JOURNALS NUMBER OF JOURNALS SR NO
NATIONAL
COURSE(S)
INTERNATIONAL
REQUIRED
AVAILABLE
REQUIRED
AVAILABLE
1.
MECHANICAL ENGINEERING
06
11
06
01
2.
ELECTRONICS & TELECOMMUNICATIO N ENGINEERING
06
04
06
03
3.
COMPUTER SCIENCE & ENGINEERING
06
08
06
LABORATORY REQUIRED FOR MECHANICAL ENGINEERING AS PER SYLLABUS
LABORATORY MECHANICAL ENGINEERING SEMESTER
REQUIRED LABS Nos.
AVAILABLE LABS Nos.
01
07
07
02
07
07
03
03
03
04
05
04
05
05
05
06
04
04
07
07
03 (03 ELECTIVES)
08
06
01 (04 ELECTIVES
LABORATORY
ELECTRONICS & TELECOMMUNICATION TOTAL LABS REQUIRED : - 09 LABS AVAILABLE : - 06 LABS TO BE DEVELOPED : - 03 COMPUTER ENGINEERING TOTAL LABS REQUIRED LABS AVAILABLE LABS TO BE DEVELOPED
: - 06 : - 06 : - NIL
HARDWARE AVAILABLE
•
COMPUTER TERMINALS AVAILABLE
: 240
•
ORDER FOR NEW TERMINALS PLACED
: 045
SOFTWARE'S AVAILABLE NAME
QUANTITY
USERS
OPERATING SYSTEM
05
240
SERVERS
10
240
SYSTEM PROGRAMMING
10
240
APPLICATION PROGRAMMING
10
10
CONSTRUCTION
AS PER CONSTRUCTION PLAN CONSTRUCTION PLAN FOR 3 CLASS ROOMS OUT OF 4 NEW CLASS ROOMS ALREADY STARTED.
Photo
FACULTY IDENTIFIED
For Mechanical Engineering: Prof. 01.
Astt.Prof. : 01
Lect.: 03,
Total: 05
For Electronics & Telecommunication Engineering : Prof.: 00,
Astt .Prof. : 00,
Lect.:05,
Total: 05
Lect.:06,
Total: 06
For Computer Sc. & Engineering: Prof.: 00,
Astt .Prof. : 00,
FOR PROPOSED COURSES 03 STAFF MEMBERS (ELECTRONICS) ARE RECRUITED JOINING REPORT ARE ATTACHED.
ADVERTISEMENT (NEWS PAPER)
MANAGEMENT UNDERTAKING
MANAGEMENT UNDERTAKING
RECENT ACHIEVEMENTS
INSTITUTE IS AWARDED THE BEST INSTITUTE FOR NSS
COLLEGE AT A GLANCE
COLLEGE BUILDING
COLLEGE FRONT ‘D’ LAWN
OPEN THEATER
PARKING + CYCLE STAND
COLLEGE BUSES
LIBRARY: GROUND FLOOR
LIBRARY: FIRST FLOOR
COMPUTER PROGRAMMING LABORATORY
COMPUTER CENTER
HOD MECHANICAL ENGINEERING (PROPOSED)
CHEMISTRY LABORATORY
PHYSICS LABORATORY
ELECTRICAL LABORATORY
MECHANICS LABORATORY
DRAWING HALL
FITTING +SMITHY (WORK-SHOP)
CARPENTRY SHOP (WORK-SHOP)
MACHINE SHOP ( WORK-SHOP)
FLUID MECHANICS LABORATORY
DESIGN HALL
HEAT TRANSFER LABORATORY
MEASURMENT SYSTEM LABORATORY
AUTOMATION & MECHATRONICS LABORATORY
CAD/CAM/CAPE LABORATORY
SECOND FLOOR PLAN
WE ARE BIG DEMOCRATICALLY RUN SOCIETAL CONCEPT SOCIETY. ADJUDGED AS, BEST EDUCATION & SOCIAL ORGANIZATION BY STATE OF MAHARASHTRA. AS A COLLEGE WE FULFILL ALL AICTE NORMS. IT IS ONLY ENGINEERING DEGREE COLLEGE IN TWO DISTRICT AKOLA & WASHIM.
THESE COURSES ARE IN DEMAND BY THE STUDENTS OF REGION. WE ARE STUDIED & PLANNED TO PROVIDE ALL NECESSARY INFRA STRUCTURE FOR THESE COURSES. WE UNDERTAKE FOR ANY OF THE PRODUCTION ENGINEERING STUDENT & JOB SECURITY OF ALL PERMANENT STAFF MEMBERS OF PRODUCTION ENGINEERING. SO, WE DESERVE THESE ADDITIONAL COURSES.