Daily Stoppage Report..xlsx

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Daily Stoppage Report..xlsx as PDF for free.

More details

  • Words: 99
  • Pages: 2
Daily Stoppage Report. Sr. No. 1 2 3 1 2 3 1 2 3

### Kiln

stop Start Total 6.05am 6.10 am 5 min 8.00pm 8.30pm 30 min 10.00pm 10.30pm 30 min

10.52am 11.15am 23min Raw Mill 5.23pm 6.40pm Coal Mill 2.50 am 5.40 am

8.05pm 3.40am 5.45 am

1.25min 50 min 05 min

Daily Stoppage Report. Reason /Action Pc firing trip due to low pressure. Feed reduced due to coal flow SFM Caliberation out Girth gear grease spray fault. Girth gear grease spray fault, planned stopped. 1100FV tripped due to overload. 1100RVF12 Overload jam 1100SC1 zss trip.

Preventive

Related Documents

Daily
April 2020 14
Daily
November 2019 22
Daily 4
April 2020 2
Daily 4.6.09
April 2020 2