MINE PLANNING – Digger Position 11 may 2018 Digger task : •
EX 152 -> Create Counter Weight
•
EX 154 -> Expose seam D & construct road LW
•
EX155 -> Loading mud area A21 & Cut Floor A11
•
EX156 -> Service est RFU night shift 11/05/2018 After RFU Expose seam D
152
Ramp RL +11 to RL 0 RL35 RL+50
RL40 RL01
RL45 RL55
Coal Priority • Seam D3 • Seam D lower • Seam B2
RL25 RL40 RL20
ULTRA/ULNA : • EX 154 Disposal : • IPD RL+20 (blok mud from west area)
•
RL11
OPD RL+40
General :
BMB:
PTP :
ENG
Operation
ENG
Operation 3
SITARUM
MINE PLANNING – PHOTO – PIT VIEW
EX0156
EX0154 n(2)
EX0154 (1)
4 SITARUM
MINE PLANNING – PHOTO – PIT VIEW
EX0155
5 SITARUM
MINE PLANNING – PHOTO – OPD VIEW
Compartment 5
Compartment 4
RL +40
6 SITARUM
MINE PLANNING – PHOTO – IPD VIEW
RL 0
7
SITARUM
1
ULTRA / ULNA OBSTACLE INFORMATION
EX0152 (OB Digger) Obstacle
ULTRA/ULNA NOT AVAILABLE
GRADE BOX
• Top Loading
Action
• -
• Grade box not avaliable
EX0154 (OB Digger) Obstacle
ULTRA/ULNA AVAILABLE
GRADE BOX
• -
Action
• -
• Grade box not avaliable
8 SITARUM – MINING OPERATION PROCESS
1
ULTRA / ULNA OBSTACLE INFORMATION
EX0155 (OB Digger) Obstacle
ULTRA/ULNA NOT AVAILABLE
GRADE BOX
• Top Loading
Action
• -
Grade box not available
EX0156 (OB Digger) Obstacle
ULTRA/ULNA -
• Service
GRADE BOX
• Grade box not available
Action
• -
SERVICE
9 SITARUM – MINING OPERATION PROCESS
3
Digger Productivity
Summary DS (11 may 2018) Digger
Productivity
EX0152
626
EX0154
EX0155
853
800
Bench Preparation
Geometri Loading point
Hauling Road
Dumping point
Next Plan Area Preparation
ULTRA / ULNA
-
-
√
√
-
-
√
√
√
√
√
√
-
EX0156
-
√
√
-
√
Note
-
Dump to bank soil IPD Used 3 HD Create Counter Weight Top Loading
-
Service
-
Dump to IPD RL +20 Used 5 HD Blast Material Finalisasi Bottom pit Bottom Loading
-
Service
Update Avg. Productivity : 13.30 WITA Legend √ : Comply X : Not Comply : Not Available
10 SITARUM – MINING OPERATION PROCESS
11
MINE PLANNING – Digger Position 11 May 2018
Digger Task : • EX0137 Service (Replace Engine) • EX0135 Expose seam C seam D • EX0145 Expose seam F
Coal Priority : • Seam C boxcut • Seam C Middle • Seam B LW
RL35 RL50
RL30
RL25
RL45 RL55
ULTRA/ULNA : • EX0135 • EX0145
RL40 RL20
RL10
Disposal : • OPD RL+50 Project: • Layback HW • Sloping HW East RL60-50 (NS) • Construct ROM (BMB) jalan keluar
PTP : ENG
Operation
12 TABUHAN
MINE PLANNING – PHOTO – PIT VIEW
EX0145-1 EX0145-2
EX0135-2 EX0135-1
Coal Priority
OB
Plan Blast Area 11 may 18
13 TABUHAN
MINE PLANNING – PHOTO – OPD VIEW
RL+50
14 TABUHAN
1
ULTRA / ULNA OBSTACLE INFORMATION
EX0137 (OB Digger) Obstacle
ULTRA/ULNA NOT AVAILABLE
Service (Replace Engine) GRADE BOX
• -
Action
• -
• -
EX0135 (OB Digger) Obstacle
ULTRA/ULNA AVAILABLE
• -
GRADE BOX
• Grade box not available
Action
• -
15 TABUHAN – MINING OPERATION PROCESS
2
ULTRA / ULNA OBSTACLE INFORMATION
EX0145 (OB Digger) Obstacle
ULTRA/ULNA AVAILABLE
GRADE BOX
Action
• -
• Grade box available
16 TABUHAN – MINING OPERATION PROCESS
3
Digger Productivity
Summary DS (11 May2018) Digger
Productivity
EX0137
Install digging limit
Bench preparation
OB/Coal loading
OB/Coal Hauling
Install Dumping Peg
Dumping point
ULTRA / ULNA
-
-
-
-
-
-
-
-
Service (replace engine)
√
√
-
Dump to OPD RL +50 Used 4 HD Bottom loading Blast material
√
√
-
Dump to OPD RL +50 Used 4 HD Bottom loading Blast material
EX0135
√
EX0145
√
√
√
Legend √ : Comply X : Not Comply : Not Available
√
√
√
√
√
√
Note
Update Avg. Productivity : 15.30 WITA
17 TABUHAN – MINING OPERATION PROCESS
4
Mine Production Control Inspection
Summary DS (11 May 2018)
18 TABUHAN – MINING OPERATION PROCESS
To become a world-class company recognised for excellent integrated mining solution provider
19 TABUHAN – MINING OPERATION PROCESS