Daftar Isi Qc-3.docx

  • Uploaded by: dian puspita
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Daftar Isi Qc-3.docx as PDF for free.

More details

  • Words: 368
  • Pages: 4
DAFTAR ISI KATA PENGANTAR……………………………………………………i DAFTAR ISI………………………………………………………………ii BAB I PENDAHULUAN 1.1

Tujuan

I-1

1.2

Pembatasan Masalah

I-1

BAB II TEORI SINGKAT 2.1

Perencanaan Proses (Process Planning)

II-1

2.2

Bill of Material

II-8

2.3

Peta Rakitan

II-10

2.4

Rencana Kualitas

II-14

2.5

Penarikan Sampel Penerimaan (Acceptance Sampling)

II-18

2.6

Penarikan Sampel untuk Atribut (MIL STD 105E)

II-20

2.7

Penarikan Sampel untuk Variabel (MIL STD 414)

II-23

BAB III TEORI SINGKAT 3.1

Flowchart Metodologi Penelitian

III-1

3.2

Flowchart Pengolahan Data

III-3

BAB IV PENGOLAHAN DATA 4.1

Peta Rakitan (A3 Landscape)

IV-1

4.1.1 Peta Rakitan Loko Kargo

IV-2

ii

4.2

4.3

4.4

4.1.2 Peta Rakitan Loko Tangki

IV-3

4.1.3 Peta Rakitan Truk Kargo

IV-5

4.1.4 Peta Rakitan Truk Tangki

IV-7

Bill of Material Struktur Rakitan (A3 Landscape)

IV-9

4.2.1 Bill of Material Struktur Loko Kargo

IV-9

4.2.2 Bill of Material Struktur Loko Tangki

IV-11

4.2.3 Bill of Material Struktur Truk Kargo

IV-13

4.2.4 Bill of Material Struktur Truk Tangki

IV-15

Bill of Material Tabel

IV-17

4.3.1 Bill of Material Tabel Loko Kargo

IV-17 `

4.3.2 Bill of Material Tabel Loko Tangki

IV-23

4.3.3 Bill of Material Tabel Truk Kargo

IV-29

4.3.4 Bill of Material Tabel Truk Tangki

IV-35

Peta Proses Operasi (A3 Landscape)

IV-40

4.4.1 Peta Proses Operasi Part Blower

IV-41

4.4.2 Peta Proses Operasi Part Body Bawah Tangki IV-42 4.5

Perencanaan Proses

IV- 43

4.5.1 Perencanaan Proses Part Blower

IV-44

4.5.2 Perencanaan Proses Part Body Bawah Tangki IV-42 4.6

Rancangan Kualitas Incoming Material

iii

IV-46

4.7

Pemeriksaan Incoming Material

IV-48

4.8

Studi Kasus

IV-52

BAB V ANALISA HASIL 5.1

Analisa Perencanaan Proses

V-1

5.1.1 Analisa Perencanaan Part Blower

V-1

5.1.2 Analisa Perencanaan Part Body Bawah Tangki

V-6

5.2

Analisa Peta Rakitan

V-13

5.3

Analisa Bill of Material

V-20

5.3.1 Analisa Bill of Material Struktur

V-20

5.3.2 Analisa Bill of Material Tabel

V-32

5.4

Analisa Peta Proses Operasi

V-37

5.5

Analisa Rencana Kualitas

V- 39

5.5.1 Analisa Rencana Kualitas Part Blower

V-39

5.5.2 Analisa Rencana Kualitas Part Body Bawah Tangki V- 39 5.6 Analisa Pemeriksaan Incoming Material

V-40

5.6.1 Analisa Pemeriksaan Incoming Material Part Blower V-40 5.6.2 Analisa Pemeriksaan Incoming Material Part Body

V-48

BAB VI KESIMPULAN DAN SARAN 6.1

Kesimpulan

V-1

iv

6.2

Saran

V-1

DAFTAR PUSTAKA

v

LAMPIRAN

vi

v

Related Documents

Daftar Isi
December 2019 58
Daftar Isi
October 2019 69
Daftar Isi
October 2019 75
Daftar Isi
October 2019 62
Daftar Isi
October 2019 76
Daftar Isi
June 2020 39

More Documents from "Sigit Suryawan"

320-1457-1-sp (1).docx
December 2019 9
Bab 6.docx
December 2019 11
Daftar Isi Qc-3.docx
December 2019 8
Alkes Hemat Igd.docx
October 2019 25
Kp-fix (1).docx
November 2019 30