Cv Copy

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cv Copy as PDF for free.

More details

  • Words: 949
  • Pages: 3
CV Nidal Zayton Nationality: Palestinian .Mobil.0599340546 Tel No ,2257664 [email protected] P.O Box 648 Hebron City EDUCATION June 1984, Kiev Red Banner Civil Engineering Institute, USSR .Master degree in Industrial and Civil Engineering.Specialized in Soil Mechanics and FoundationsWork Experience 1 Private office (Al-Wehda) at Hebron City , through this ,1995 – 1990-,984-1986 office many projects, planning houses designs and building structures had been .accomplished committed to work for (Haythem AL-Kharouf) company as a project ,2005-2007 manager, the project was constructing many buildings (of 14 floors, others of 7 floors) including offices, apartments, and parking .Some of the offices and parking were constructed underground. Waste water difficulty was solved through establishing solid hole in the ground that drains this water by pumps, retaining walls .of biles and anchors were constructed A project manager at IT college of Palestine Polytechnics for ,2003-2005 University Graduates Union project ( I have suggested a change in the plan to benefit from natural pressure to draw water from the tank to supply the water station which used a mechanical pressure (pumps) to transport water to a tank on the roof that maintain a continuous water supply) , and so we over came water and sanitation problems in the whole area ( the building and surroundings) , besides changes in structural( new foundation , connections between beams and columns had been made in regard of the type of the soil) and architectural ( new .inner design, new site plan ) plans Occupation University Graduates Project, Hebron ,2003-2005 (1 A project manager for University Graduates Union a change in the plan to benefit from natural pressure to draw water from the tank to supply the water station which used a mechanical pressure (pumps) to transport water to a tank on the roof that maintain a continuous water supply) , and so we over came water and sanitation problems in the whole area ( the building and surroundings) , besides changes in structural( new foundation , connections between beams and columns had been made in regard of the type of the soil) and architectural ( new inner .design, new site plan ) plans Al – Tamim Complex (2800m2), Hebron city ,2000-2002(2 A manager engineer for Sonesta Company .(Structural work (concrete reinforcement .Support the in-between beams by being joined to the columns Changing in the hall blocks (24mx18m) structure (from eatong block to cement block .and Kalkal boxes) without the in between columns .(A new plan for arc structure (reinforcement of steel .Constructing a whole sanitation for the building .(Structural work (concrete reinforcement -

Changing in the hall blocks (24mx18m) structure (from eatong block to cement block .and Kalkal boxes) without the in between columns .(A new plan for arc structure (reinforcement of steel .Constructing a whole sanitation for the building Changing in the hall blocks (24mx18m) structure (from eatong block to cement block .and Kalkal boxes) without the in between columns .(A new plan for arc structure (reinforcement of steel .Constructing a whole sanitation for the building Program for activation of workers, the old city of Hebron, Hebron ,20001-2003 (3 Full Renovation of housesNew building at Alia Hospital (the Northern section), Hebron ,1997-1998(4 A site engineer for Palestine Development Company Excavation for foundations and testing the soil typeEstablishing foundations for the new buildingA project manager for the Rehabilitation Committee Renovation of Women floor (MHO) at governmental Alia Hospital, ,1996-1996(5 Hebron A project manager .Solving sanitation problems, gas supply, and central heating netConstructing a new ground slaps after demolition the old one Finishing workKarma elementary school (150m2), Dora, Al- Shohada school (300m2), ,1995-1996(6 Al-Samoa, Hebron A site engineer for Dofesh Company Yards constructionFinishing workRoad construction, Bait Kahel (7km), Hebron ,1994-1994 (7 A project engineer for the village council .Compacting 30cm of basecourse.Applying hot asphalt after the compactingRenovation of AL – Marwani Mosque (4000m2), Jerusalem ,1993-1995 (8 A project engineer for the Islamic council .Complete plastering (inner and exterior part) and wall tiling.Renovation of many houses in the old city of JerusalemEstablishing Al – Jabali Elementary school (1900m2), Hebron city, ,1991-1992 (9 Hebron A project engineer for The Residency Department .Constructing foundation biles to solve underground water.(Finishing the whole project (building, surroundings and sanitationEstablishing of Governmental Departments (7500m2), Hebron city, ,1988-1990 (10 Hebron A project engineer for The Residency Department Constructing an underground structure as the centre of the whole cables net in the.city Establishing a Governmental Complex.Build a special room for the electrical generator.Constructing a central heating and sanitation net-

Supervision on the site structure (surroundings) (gardens, parking, special security.(gates Jan1987----July1987, Constructing Al- Rashedeen Elementary school (1900m2), (11 Hebron city A site engineer for the Residency Department .Insulation for the inner part of the building through Polytane.Using the retaining walls as a mechanical support for the outer theatre seaConstruction of Residence homes and offices, Halhoul, Hebron ,1986-1987 (12 city, Hebron - Treatment of the old building in order to support the new connected building (A project engineer (planning and supervision Construction of Al- Samoa Secondary School (1500m2), Al- ,1985-1986 (13 Samoa village, Hebron Site engineer for Residence Department Supervision of the whole engineering activities (structural, architectural, (sanitation, and electricity Establishing of anew doubled foundation (two types of supporting foundations).so as to give the soil the capacity to support the construction (A project engineer (planning and supervision .Solve underground water problems and soil treatment.Construction of Retaining walls– Competencies and Interests (Languages

Arabic (native speaker (English (command speaking, good writing (Russian (excellent – 710 hours Skills Certificates of computer training – Microsoft word, Excel and AutoCAD Structure programs (RCD), Internet Ms Project Certificate in Insulation of building Registered in the official list of accredited arbitrators in Ministry of Justice in the first category in the field of .(Engineering Arbitration (Civil Nidal Zayton

Related Documents

Cv Copy
November 2019 12
Copy Of Cv Qayyum
July 2020 8
Copy Of Cv
December 2019 10
Copy Of Final Cv
December 2019 20
Copy Of General Cv
May 2020 8