LPG Storage and Handling 2X 300 MT

SNO

Description

UNIT

QTY Customs tariff

A

EQUIPMENTS & PIPELINE

1 2 6

LPG Compressor LPG pump LPG/VPG/utility pipeline

No. No. L.S.

1 2 lot

5% 5% 5%

7 8 9 10 11

ROV/Control valves / Valves Service water pumps & piping Loading arms Mercaptan dosing equipment Weigh Bridge

L.S. L.S. Nos L.S. no

lot 0 2 lot 1

10% na 5% 5% 5%

B 1

FIRE PROTECTION SYSTEM Water Spray System a) Bullets b) LPG Pump shed c) TT Gantry

nos nos nos

2 1 1

5% 5% 5% 5%

L.S.

5

5%

item code

2

Deluge valve with accessories

C

STORAGE FACILITIES

1

Bullet-Butane

L.S.

2

20%

7311.0000.00

2

Bullet-Propane

L.S.

0

20%

7311.0000.00

D

INSTRUMENTATION L.S.

1

5%

1

2

CONTROL SYSTEM inclusive of Consoles interconnecting cables, Basic system engineering & interconnection Tank safety fittings

ls

2

5%

3

Pressure Guages

L.S.

1

5%

4

Pressure Transmitter

L.S.

1

5%

5

Pressure Switches

L.S.

1

5%

6

Differential Pressure Instruments

L.S.

1

5%

7

Mass Flow Meters

L.S.

1

5%

8

Control Valves

L.S.

1

10% 10%

9

Thermal Relief Valves

L.S.

1

10

Portable Gas Detector with HART Output

L.S.

1

5%

11

Self Actuated Pressure Control Valve

L.S.

1

10%

E

Civil works

1 2 3 4 5 6

Bullets foundation and mounding pump house PMCC room weigh bridge foundation pipe supports etc Truck gantry

L.S. L.S. L.S. L.S. L.S. L.S.

lot lot lot lot lot lot

na na na na na na

F

Electrical works

1 2 3 4

PMCC Cables Flame proof fittings Other Electrical works

L.S. L.S. L.S. L.S.

lot lot lot lot

20% 5% 20% na

G

Mechanical works

1 2 3

Plant piping Erection and testing Commissioning

L.S. L.S. L.S.

1 1 1

na na na

Description of Items

A facility for increasing the pressure of gas/LPG A machine for transferring LPG to storage tank Pipe lines for conducting/transferring gas from one location to another A facility to allow or disallow flow of product in pipelines and other facilities A facility and network of pipelines for transferring service water for usage A facility for loading LPG to road tankers A facility for injection of chemicals which allows for easy identification of escape of LPG into the atmosphere A machine for measuring the weight of LPG

Spray nozzles for water for fire fighting Spray nozzles for water for fire fighting Spray nozzles for water for fire fighting Spray nozzles for water for fire fighting Spray nozzles for water for fire fighting

A cylindrical vessel for storing butane C4 A cylindrical vessel for storing propane C3

A facility for controlling onsite facilities through comntrols in the control room

Facilities for safe operations of the tanks A facility for measuring pressures A facility for passing preassure reading across to users A facility for controlling the reading of pressure by an instrument A facility for reading and comparing readings of two pressures A facility for measuring the flow of crude oil A facility to allow or disallow flow of product in pipelines and other facilities A facility for bringing pipelines to safe conditions incase of emergencies A facility for detecting leakage of gas A self-working facility to allow or disallow flow of product in pipelines and other facilities

A construction for placing bullets (LPG storage) ontop A facility for keeping pumps A construction for placing weigh bridge ontop A packing slot for LPG truck before loading

Elecrical control panel Electrical cables electrical fittings

Flow station description Equipment inlet manifold hp separator MP Separator lp separator Test separator bath heater/Heater Treater surge vessel KO drum

qty

Customs tariff 1 2 2 2 1 0 1 1

10% 5% 5% 5% 5% 5% 5% 5%

Crude oil Storage tank 10 K BBL Int. Oil Storage tank 3 k BBL Off Spec Storage Tank 3 K BBL Produced Water Storage Tank 1.2 k BBL Trated water storage tank 2.5 k BBL

2 1 1 5% for 1 plate,20% for 1 structural steel

Flare KO drum Flare System

1 1

5% 5%

2 2 2 2 2 10 1

5% 5% 5% 5% 5% 5% 5%

1 1 0

5% 5% 5%

2

0%

2 1 1

0% 0% 0%

1 1 1 2 1 1 2 1 2 2 1 1 1 2 1 2 1

5% 0% 0% 5% 5% local 5% local 5% 5% 5% 5% 5% 5% local 5% local

Crude oil export pump 75 Cu. m Crude oil transfer pump 75 Cu. M Produced water transfer pump Flare KO drum transfer pump off spec transfer pump small transfer pumps Chemical injection System(6 set) CBD system Water Treatment and Handling Water Inj pump (Provisional) Gas Compressors- from HP Seperator to Gas plant Gas Compressors- from gas plant to export line fuel Gas conditioning System Gas Dehydration Pkg Utilities diesel generator refurbished gas generator new gas generator refurbished Air Compressor 200cfm,8kg/cm2 Air Dryer Service water storage tank 125 BBL Service water Pump Bore wells System Fire water storage tank 5.5 k BBL Fire water pump 410 cu. M Fire water Hydrant System Sprinklers Foam System Jockey pump Diesel Storage tanks 40 KL Diesel Transfer Pumps & piping Nitrogen System

description Electrical MCC PDB LDB cables Cable treys earthing and lightning protection lighting UPS FLP fittings

? ? ?

qty

Customs tariff 1 20% 1 20% 1 20% 1 5% 1 1 5% for copper 1 20% 1 10% 1 20%

Instrumentation PLC/SCADA cables field instruments fire detection control valves shut down valves ROVs Level indicators switches relief valves flowmeter

1 1 1 1 1 1 1 1 1 1 4

5% 5% 5% 5% 10% 10% 10% 5% 20% 10% 5%

Pipes & Accessories pipes flanges fitting valves supports(pipe rack etc)

1 1 1 1 1

5% 20% 20% 10% 20%

Description Pipes Coating/painting Valves Flanges & Fittings Pig launcher/receiver Tie in valves and fittings Cables OFC/HDPE conduit Electrical cable for well head panel CP LACT/turnine meter Control valves Gauges/RTD Shut down valves Switches Transmitters/receiver Tele communication Engineering Route survey/Cadstal Survey/Soil Test ROU Community compensation @ 40% Installation , Testing & commissioning Third Party Inspection charges Civil works Pipe Supports

customs duty 5%

Description of Items Cylindrical conduits for conducting/transferring crude oil from one location to another

Matering for covering pipelines to prevent corrosion arising from contacts with soil 10% 20%

A facility to allow or disallow flow of crude oil in pipelines and other facilities Connectors for pipelines A facility for cleaning pipelines of dirts, solids and other foreign particles that made impede flow

20% na

Connectors for pipelines at a junction or connection to another pipeline/facility A network of elecrical wires for conducting current A network of elecrical wires for conducting current at the wellheads

na 10%

A corrosion-prevention facility A facility for measuring flow of crude oil in a pipeline A set of valves for monitoring set conditions

A facility for measuring certain conditions of flow of crude oil in a pipeline 10% 20%

A set of valves for bringing the flowstation to safe contions incase of emergencies A facility for starting or stopping an operation process A facility for passing and accepting messages via air Means of communicating between operators on site amd in control room

na na na na na na na na

A scientific system of verifying the feasibility of a project technically A process of verifying the soil condition and route accessibility before distortion as a result of the project A land stirp dedicated for the laying of pipelines Entitlement to communities hosting the ptoject Process of assmblage and confirming readiness for operations Amount paid to third parties for services rendered on the execution of the project

Construction activities required to be performed onsite Stands overwhich pipelines are laid for rigidity

Related Documents

Customs Tariff R1
July 2020 8
Customs Tariff 1-97
November 2019 18
Tariff & Customs Code Vol 1
December 2019 16
Tariff & Customs Code Vol 2
December 2019 7
Customs
May 2020 21