CRONOGRAMA VALORIZADO DE EJECUCION DE OBRA Obra

“REPARACION DE VIAS VECINALES; EN EL TRAMO CASERIO HONORIA - NUEVA UNION (ZONAS CRITICAS) EN LA LOCALIDAD DE HONORIA, DISTRITO DE HONORIA, PROVINCIA DE PUERTO INCA, DEPARTAMENTO DE HUANUCO”

Cliente

MUNICIPALIDAD DISTRITAL DE HONORIA

Lugar

HUANUCO - PUERTO INCA - HONORIA

Costo al

3/26/2016 MES 1

MES 2

30 d.c.

30 d.c.

30 d.c. Item

Descripción

01

OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD

01.01

MONTO

60 d.c. %

MONTO

CARTEL DE OBRA (3.00 X 5.00) BANNER INC. COLOCACION

01.01.02

ALMACEN DE GUARDIANIA 36 M2

550.00

S/550.00

100.00%

4,000.00

S/4,000.00

100.00%

SEGURIDAD Y SALUD

01.02.01

ELABORACIÓN, IMPLEMENTACIÓN Y ADMINISTRACIÓN DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

2,276.80

S/2,276.80

100.00%

01.02.02

EQUIPOS DE PROTECCIÓN INDIVIDUAL

1,500.00

S/1,500.00

100.00%

01.02.03

SEÑALIZACION TEMPORAL DE SEGURIDAD

970.20

S/970.20

100.00%

01.02.04

CAPACITACION EN SEGURIDAD Y SALUD

717.40

S/357.21

49.79%

9,954.80

S/9,954.80

100.00%

02 02.01 02.01.01 02.02

%

OBRAS PROVISIONALES

01.01.01

01.02

Costo s/.

S/360.19

50.21%

TRABAJOS DE AFIRMADO TRABAJOS PRELIMINARES TRAZO NIVELACION Y REPLANTEO MOVIMIENTO DE TIERRAS

02.02.01

RASPADO Y PERFILADO A NIVEL DE SUBRASANTE DE TERRENO CON MAQUINARIA

87,893.60

S/65,370.87

74.38%

S/22,522.74

25.63%

02.02.02

CONFORMACION DE CUNETAS

16,024.80

S/3,104.81

19.38%

S/12,920.00

80.63%

51,540.00

S/51,540.00

100.00%

3,027.80

S/3,027.80

100.00%

1,754.70

S/1,754.70

100.00%

02.03 02.03.01 03 03.01 03.01.01 03.01.01.01 03.02 03.02.01

PAVIMENTOS AFIRMADO EN ZONAS CRITICAS DEL TERRENO E=4" H : TR 8 : 2 MITIGACION AMBIENTAL MEDIDA DE PREVENCIÓN EDUCACION AMBIENTAL CAPACITACION A LA COMUNIDAD BENEFICIARIA EN SOSTENIBILIDAD AMBIENTAL SEÑALIZACION LETRERO INFORMATIVOS, PREVENTIVOS Y DE REGLAMENTACION

180,210.10

88,084.69

92,125.43

GASTOS GENERALES 10%

18,021.01

8,808.47

9,212.54

UTILIDAD 10%

18,021.01

8,808.47

9,212.54

216,252.13

105,701.63

110,550.52

COSTO DIRECTO

PRESUPUESTO PARCIAL IGV 18% PRESUPUESTO TOTAL

38,925.38

19,026.29

19,899.09

255,177.49

124,727.92

130,449.61

PORCENTAJE PARCIAL

48.88%

51.12%

PORCENTAJE ACUMULADO

48.88%

100.00%

S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.

9,654.21 4,550.00 550.00 4,000.00 5,104.21 2,276.80 1,500.00 970.20 357.21 78,430.48 9,954.80 9,954.80 68,475.68 65,370.87 3,104.81

S/. 360.19

S/. 360.19

S/. 360.19 S/. 86,982.74

S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.

35,442.74 22,522.74 12,920.00 51,540.00 51,540.00 4,782.50 3,027.80 3,027.80 3,027.80 1,754.70 1,754.70

Related Documents

Cronograma
May 2020 29
Cronograma
August 2019 56
Cronograma
June 2020 8
Cronograma
May 2020 10
Cronograma
November 2019 33
Cronograma
June 2020 8

More Documents from ""