PRESUPUESTO: CLIENTE: UBICACIÓN : PRESUPUESTO:

ITEM 01 01.01 01.02 01.03 01.04 02 02.01 02.02 02.03 02.04 03 03.01 03.01.01 03.01.02 03.01.03 03.01.04 03.01.05 03.02 03.02.01 03.02.02 03.02.03 03.02.04 03.02.05 04 04.01 04.01.01 04.01.02 04.02 04.02.01 04.02.02 04.02.03 04.02.04 05 05.01 05.01.01 05.01.02 05.01.03 05.01.04 05.02 05.02.01 05.02.02 05.02.03 05.02.04 06 06.01 06.01.01

"CREACIÓN DE PISTAS Y VEREDAS EN LAS CALL MUNICIPALIDAD DISTRITAL DE LUCANAS AYACUCHO - LUCANAS - LUCANAS 1,614,392.78 NUEVOS SOLES

DESCRIPCION UND. OBRAS PROVISIONALES CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60 X 2.40 m u FLETE TERRESTRE A OBRA glb ALQUILER DE AMBIENTE PARA OFICINA, ALMACEN Y CASETA DE GUARDIA mes MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS glb TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 TRAZO, NIVELACION Y REPLANTEO m2 DEMOLICION DE CANAL EXISTENTE (0.5x0.60m) m2 ENCIMADO DE BUZON EXISTENTE u CONSTRUCCION PAVIMENTO RIGIDO MOVIMIENTO DE TIERRAS CORTE EN MATERIAL COMPACTO A NIVEL DE SUBRASANTE m3 RELLENO COMPACTADO CON MATERIAL SELECCIONADO m3 ELIMINACION DE MATERIAL EXCEDENTE C/MAQUINARIA m3 PERFILADO Y COMPACTADO DE SUBRASANTE m2 CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.20M. m3 OBRAS DE CONCRETO SIMPLE CONCRETO f 'c=210 KG/cCM2 + 25% P.M. E=0.20M. m3 ENCOFRADO Y DESENCOFRADO DE PAVIMENTO m2 CURADO DE CONCRETO EN PAVIMENTO m2 CORTE DE CONCRETO PARA JUNTAS m JUNTAS ASFALTICAS EN PAVIMENTO m CONSTRUCCIÓN DE SARDINEL TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 TRAZO, NIVELACION Y REPLANTEO m2 OBRAS DE CONCRETO SIMPLE CONCRETO F´C= 175 KG/CM2 EN SARDINELES m3 ENCOFRADO Y DESENCOFRADO DE SARDINEL m2 CURADO DE CONCRETO m2 JUNTA ASFALTICA EN SARDINELES m CONSTRUCCION DE VEREDAS MOVIMIENTO DE TIERRAS EXCAVACION MANUAL DE TERRENO A NIVEL DE SUBRASANTE m3 RELLENO COMPACTADO CON MATERIAL PROPIO H=0.50 m3 ACARREO DE MATERIAL EXCEDENTE, DISTANCIA 50-100 METROS m3 CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.10M. m2 OBRAS DE CONCRETO SIMPLE CONCRETO F´C=140 KG/M2 EN VEREDAS E=4" CON ACABADO m2 ENCOFRADO Y DESENCOFRADO DE VEREDA m2 CURADO DE CONCRETO EN VEREDA m2 JUNTAS ASFALTICAS PARA VEREDAS m OBRAS DE DRENAJE PLUVIAL CONSTRUCCION DE CUNETAS MOVIMIENTO DE TIERRAS

METRADO 1.00 1.00 8.00 1.00 8,946.13 8,946.13 46.58 3.00

3,254.77 715.00 3,174.00 5,223.29 1,044.66 1,044.66 734.01 5,223.29 1,160.00 3,670.07

1,719.00 515.70 71.25 973.82 1,016.88 133.28

652.45 225.38 533.83 213.53 2,049.83 248.82 2,049.83 683.28

06.01.01.01 06.01.01.02 06.01.01.03 06.01.02 06.01.02.01 06.01.02.02 06.01.02.03 06.01.02.04 06.02 06.02.01 06.02.01.01 06.02.01.02 06.02.01.03 06.02.01.04 06.02.01.05 06.02.01.06 06.02.02 06.02.02.01 06.02.02.02 06.02.02.03 06.02.02.04 06.02.02.05 06.03 06.03.01 06.03.01.01 06.03.01.02 06.03.01.03 06.03.02 06.03.02.01 06.03.02.02 06.03.02.03 06.03.02.04 06.03.03 06.03.03.01 06.03.03.02 06.03.03.03 06.04 06.04.01 06.04.01.01 06.04.01.02 06.04.01.03 06.04.02 06.04.02.01 06.04.02.02 06.04.02.03 06.04.02.04 06.04.03 06.04.03.01 06.04.03.02 06.04.03.03 07 07.01 07.01.01 07.01.02 07.02 07.02.01 07.02.02

EXCAVACION DE ZANJAS PARA CUNETAS m3 PERFILADO EN SECCION DE CUNETAS m2 ACARREO DE MATERIAL EXCEDENTE, DISTANCIA 50-100 METROS m3 OBRAS DE CONCRETO SIMPLE CONCRETO F´C=140 KG/CM2. EN CUNETAS m3 ENCOFRADO Y DESENCOFRADO DE CUNETA m2 CURADO DE CONCRETO m2 JUNTA ASFALTICA PARA CUNETAS m CONSTRUCCION DE ALCANTARILLAS MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJA PARA ALCANTARILLA m3 RELLENO Y COMPACTADO CON MATERIAL PROPIO EN SANEAMIENTTOm3 ACARREO DE MATERIAL EXCEDENTE, DISTANCIA 50-100 METROS m3 REFINE Y NIVELACION EN TERRENO NORMAL m2 CAMA DE APOYO E=0.10M. ZANJA P/ALCANTARILLA TMC DE Ø24" m SUMINISTRO E INSTALACION DE ALCANTARILLA DE Ø=24" m OBRAS DE CONCRETO CONCRETO CICLOPEO F'C=140 KG/CM2 + 30 % PM. m3 CONCRETO F´C= 175 KG/CM2 PARA ALCANTARILLAS m3 ENCOFRADO Y DESENCOFRADO m2 ACERO DE REFUERZO FY=4200KG/CM2 kg CURADO DE CONCRETO m2 CANAL DE CONCRETO MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJA PARA CANAL HASTA 1M m3 REFINE Y NIVELACION EN CANAL m2 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 OBRAS DE CONCRETO ARMADO CONCRETO F¨C=210 KG/CM2 CANAL m3 ENCOFRADO Y DESENCOFRADO CANALES m2 ACERO DE REFUERZO FY=4200KG/CM2 kg JUNTAS ASFALTICAS EN CANAL m TAPA DE CONCRETO CONCRETO F¨C=210 KG/CM2 EN TAPA m3 ENCOFRADO Y DESENCOFRADO DE TAPA m2 ACERO DE REFUERZO FY=4200KG/CM2 kg CRUCE DE CANAL DE CONCRETO ARMADO MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJA PARA CANAL HASTA 1M m3 REFINE Y NIVELACION EN CANAL m2 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 OBRAS DE CONCRETO ARMADO CONCRETO F¨C=210 KG/CM2 CANAL m3 ENCOFRADO Y DESENCOFRADO CANALES m2 ACERO DE REFUERZO FY=4200KG/CM2 kg JUNTAS ASFALTICAS EN CANAL m TAPA DE CONCRETO CONCRETO F¨C=210 KG/CM2 EN TAPA m3 ENCOFRADO Y DESENCOFRADO DE TAPA m2 ACERO DE REFUERZO FY=4200KG/CM2 kg CONSTRUCCION DE GRADERIAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 TRAZO, NIVELACION Y REPLANTEO m2 MOVIMIENTO DE TIERRAS EXCAVACION MANUAL DE TERRENO m3 PERFILADO Y COMPACTADO DE TERRENO m2

426.59 2,369.94 533.83 284.39 1,990.75 1,611.56 884.78

22.19 10.01 15.24 10.44 10.44 8.70 0.52 0.81 8.80 612.32 3.01

47.78 53.09 59.73 17.52 148.65 975.16 17.00 7.88 9.00 515.40

28.43 63.18 35.54 16.37 80.41 540.28 23.65 6.32 3.40 343.17

114.42 114.42 35.42 114.42

07.02.03 07.02.04 07.03 07.03.01 07.03.02 07.03.03 07.04 07.04.01 07.04.01.01 07.04.01.02 07.04.02 07.04.02.01 07.04.02.02 07.04.02.03 07.04.03 07.04.03.01 07.04.03.02 07.04.03.03 07.04.04 07.04.04.01 07.04.04.02 07.04.04.03 07.04.05 07.04.05.01 07.04.06 07.04.06.01 07.04.07 07.04.07.01 08 08.01 08.01.01 08.01.02 08.01.03 08.01.04 08.01.05 08.02 08.02.01 08.02.02 08.02.03 08.02.04 08.02.05 08.02.06 09 09.01 09.01.01 09.01.02 09.01.03 09.01.04 09.02 09.02.01 09.02.02 09.02.03 09.02.04 09.02.05 09.03 09.03.01 09.03.02

ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 CONFORMACION Y COMPACTACION DE BASE GRANULAR E=0.10M. m2 OBRAS DE CONCRETO SIMPLE CONCRETO 1:8+25% PM PARA GRADERIA m3 ENCOFRADO Y DESENCOFRADO EN GRADERIAS m2 CURADO DE CONCRETO m2 MUROS EN GRADERIA TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL m2 TRAZO, NIVELACION Y REPLANTEO m2 MOVIMIENTO DE TIERRAS EXCAVACION MANUAL DE TERRENO m3 PERFILADO Y COMPACTADO DE TERRENO m2 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 OBRAS DE CONCRETO SIMPLE CONCRETO 1:10 +30% P.G. PARA CIMIENTOS CORRIDOS m3 CONCRETO 1:8+25% PM PARA SOBRECIMIENTOS m3 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS m2 OBRAS DE CONCRETO ARMADO CONCRETO F¨C=175 KG/CM2 COLUMNAS m3 ENCOFRADO Y DESENCOFRADO COLUMNAS m2 ACERO DE REFUERZO FY=4200KG/CM2 kg ALBAÑILERIA MUROS DE LADRILLO CORRIENTE (8X11.5X22.5) SOGA MEZCLA C:A 1:5 m2 REVOQUES ENLUCIDOS Y DERRAMES TARRAJEO PRIMARIO RAYADO C:A 1:5 E=1.5CM m2 PINTURA PINTURA CON ESMALTE SINTETICO m2 MUROS DE CONTENCION MOVIMIENTO DE TIERRAS EXCAVACION DE ZANJAS PARA CIMIENTOS m3 RELLENO COMPACTADO CON MATERIAL PROPIO m3 RELLENO CON MATERIAL FILTRANTE m3 ELIMINACION DE MATERIAL EXCEDENTE MANUAL m3 NIVELACION Y COMPACTACION MANUAL DE SUB RASANTE m2 OBRAS DE CONCRETO SIMPLE SOLADO PARA ZAPATA DE 2" MEZCLA 1:12 CEMENTO-HORMIGON m2 CONCRETO CICLOPEO F´C=175 KG/CM2 + 30%PG. m3 ENCOFRADO Y DESENCOFRADO MURO DE CONTENCION m2 CURADO DE CONCRETO m2 SUMINISTRO Y COLOCACION DE TUB. PARA FILTRO DN 2" m JUNTA DE CONSTRUCCION CON TEKNOPORT m2 REPOSICION Y CAMBIO DE TUBERIAS DE SANEAMIENTO Y AGUA MOVIMIENTO DE TIERRAS EXCAVACION MANUAL DE TERRENO PARA LINEA DE AGUA m3 REFINE Y NIVELACION ZANJA TERR. NORMAL m2 CAMA DE APOYO PARA TUBERIA (Ancho 0.50.m e=0.10m.) m RELLENO Y COMPACTADO CON MATERIAL PROPIO EN SANEAMIENTTO m3 INSTALACION DE TUBERIAS RED DE AGUA, TUBERIA PVC NTP ISO 1452 m RED DE ALCANTARILLADO, TUBERIA PVC S-25 NTP 4435 m SUMINISTRO E INSTALACION DE ACCESORIOS DE AGUA u SUMINISTRO E INSTALACION DE ACCESORIOS DE ALCANTARILLADO u PRUEBA HIDRAULICA Y DESINFECCION EN REDES DE AGUA m RENOVACION DE CAJA DE INSPECCION EXCAVACION MANUAL DE TERRENO m3 CAJA DE REGISTRO DE CONCRETO (0.50x0.30m) u

44.27 114.42 21.21 79.31 114.42

35.38 35.38 7.92 35.38 9.90 5.54 1.78 23.76 0.23 4.32 50.05 29.76 5.58 24.18

323.10 142.50 27.00 225.75 84.00 84.00 156.00 487.64 483.00 22.50 39.00

176.00 220.00 440.00 110.00 440.00 180.00 1.00 1.00 620.00 0.84 14.00

10 10.01 10.02 10.03 10.04 10.05 11 11.01 11.02 11.03 12 12.01 12.01.01 12.01.02 12.02 12.02.01 12.02.02 13 13.01 13.02 13.03 14 14.01 14.02 14.03 15 15.01

ENSAYOS DE LABORATORIO CBR VERIFICACION DE SUB RASANTE + PROCTOR VERIFICACION DE MATERIA DE SUB BASE + PROCTOR ENSAYOS DE DENSIDAD DE CAMPO (CONO DE ARENA) ENSAYOS DE CALIDAD DE CONCRETO (RESISTENCIA A LA COMPRESION) ENSAYO DE DISEÑO DE MEZCLA SEGURIDAD Y SALUD EQUIPOS DE PROTECCION INDIVIDUAL SEÑALIZACIONES Y EQUIPOS DE SEGURIDAD CAPACITACIÓN EN SEGURIDAD Y SALUD SEÑALIZACION SEÑALIZACION VERTICAL SEÑALIZACION PREVENTIVA (O.60x0.60m) SEÑALIZACION INFORMATIVA SEÑALIZACION HORIZONTAL PINTURA DE PASO PEATONAL Y SIMBOLOS DIRECCIONALES PINTADO DE FRANJAS DE PAVIMENTO REUBICACION DE POSTE DE LUZ EXCAVACION MANUAL DE TERRENO RELLENO Y COMPACTACION ACCESORIOS, CONDUCTORES Y OTROS MITIGACION DE IMPACTO AMBIETAL SEÑALIZACION EN OBRA DURANTE LA EJECUCION LIMPIEZA GENERAL DE OBRA MEDIDAS DE MITIGACION VARIOS PLACA RECORDATORIA

COSTO DIRECTO GASTOS GENERALES (8%) UTILIDAD (7%) SUBTOTAL IGV (18%) COSTO DE PRESUPUESTO DE OBRA SUPERVISION 5% TOTAL PRESUPUESTO DE OBRA VALORIZACION ACUMULADA PORCENTAJE DE AVANCE MENSUAL

u u u u u glb glb glb

u u

1.00 1.00 25.00 16.00 1.00 1.00 1.00 1.00

18.00 19.00

m2 m

193.60 4,806.00

m3 m3 u

1.50 1.06 8.00

m m2 glb

1,250.00 8,946.13 1.00

glb

1.00

15% 10% 18% 5.0%

CRONOGRAMA VALORIZADO DE OBRA

PISTAS Y VEREDAS EN LAS CALLES PRINCIPALES Y PERIMETRO DEL PARQUE PRINCIPAL DEL BARRIO NUEVO HORIZONTE, DISTRITO DE LUC

ISTRITAL DE LUCANAS ANAS - LUCANAS NUEVOS SOLES

META TOTAL PRECIO (S/.)

PARCIAL(S/.)

%

MES 1 %

AVANCE

1,619.26 63,657.97 350.00 13,000.00

1,619.26 63,657.97 2,800.00 13,000.00

0.10% 4.06% 0.18% 0.83%

100 50 20 100

1,619.26 31,828.99 560.00 13,000.00

2.44 0.88 40.76 357.50

21,828.56 7,872.59 1,898.60 1,072.50

1.39% 0.50% 0.12% 0.07%

30 25 100 100

4.99 8.90 4.81 1.51 95.94

16,241.30 6,363.50 15,266.94 7,887.17 100,224.68

1.04% 0.41% 0.97% 0.50% 6.40%

422.51 43.39 2.21 1.92 3.97

441,379.30 31,848.69 11,543.47 2,227.20 14,570.18

28.18% 2.03% 0.74% 0.14% 0.93%

2.44 0.88

4,194.36 453.82

430.32 43.39 2.86 6.93

MES 2 %

AVANCE

20 20

12,731.59 560.00

6,548.57 1,968.15 1,898.60 1,072.50

20 25

4,365.71 1,968.15

20 20 10 20 20

3,248.26 1,272.70 1,526.69 1,577.43 20,044.94

30 30 30 30 30

4,872.39 1,909.05 4,580.08 2,366.15 30,067.40

10 10 10 5

44,137.93 3,184.87 1,154.35 111.36

35 35 35 35 20

154,482.76 11,147.04 4,040.21 779.52 2,914.04

0.27% 0.03%

20 30

838.87 136.15

30,660.30 42,254.05 2,908.28 923.63

1.96% 2.70% 0.19% 0.06%

15 15 15

4,599.05 6,338.11 436.24

17.81 35.19 17.47 13.66

11,620.13 7,931.12 9,326.01 2,916.82

0.74% 0.51% 0.60% 0.19%

30 40

3,486.04 3,172.45

15

437.52

53.59 35.71 2.86 6.93

109,850.39 8,885.36 5,862.51 4,735.13

7.01% 0.57% 0.37% 0.30%

5 5 5

5,492.52 444.27 293.13

31.16 1.51 17.47

13,292.54 3,578.61 9,326.01

0.85% 0.23% 0.60%

20 30

2,658.51 1,073.58

40 30 50

5,317.02 1,073.58 4,663.01

418.25 49.70 2.86 6.93

118,946.12 98,940.28 4,609.06 6,131.53

7.59% 6.32% 0.29% 0.39%

20 20 20

23,789.22 19,788.06 921.81

40 40 40 50

47,578.45 39,576.11 1,843.62 3,065.77

40.76 39.59 17.47 6.12 14.77 317.97

904.46 396.30 266.24 63.89 154.20 2,766.34

0.06% 0.03% 0.02% 0.00% 0.01% 0.18%

30 40

271.34 158.52

40 30

25.56 46.26

30 30 50 30 30 50

271.34 118.89 133.12 19.17 46.26 1,383.17

295.04 492.93 44.68 4.67 2.86

153.42 399.27 393.18 2,859.53 8.61

0.01% 0.03% 0.03% 0.18% 0.00%

40 30 30 40 30

61.37 119.78 117.95 1,143.81 2.58

34.94 1.02 17.81

1,669.43 54.15 1,063.79

0.11% 0.00% 0.07%

40 30

667.77 16.25

30 40 50

500.83 21.66 531.90

507.74 46.12 4.67 6.93

8,895.60 6,855.74 4,554.00 117.81

0.57% 0.44% 0.29% 0.01%

20 20 40

1,779.12 1,371.15 1,821.60

50 50 40 50

4,447.80 3,427.87 1,821.60 58.91

507.74 39.65 4.67

4,000.99 356.85 2,406.92

0.26% 0.02% 0.15%

50 50 60

2,000.50 178.43 1,444.15

34.94 1.02 17.81

993.34 64.44 632.97

0.06% 0.00% 0.04%

100 80 100

993.34 51.55 632.97

20

12.89

507.74 46.12 4.67 6.93

8,311.70 3,708.51 2,523.11 163.89

0.53% 0.24% 0.16% 0.01%

50 50 60

4,155.85 1,854.26 1,513.87

50 50 40 100

4,155.85 1,854.26 1,009.24 163.89

507.74 39.65 4.67

3,208.92 134.81 1,602.60

0.20% 0.01% 0.10%

100 100 100

3,208.92 134.81 1,602.60

2.44 0.88

279.18 100.69

0.02% 0.01%

40 30

111.67 30.21

40 30

111.67 30.21

30.57 5.39

1,082.79 616.72

0.07% 0.04%

30 20

324.84 123.34

50 60

541.40 370.03

17.81 13.66

788.45 1,562.98

0.05% 0.10%

100 50

788.45 781.49

301.08 45.23 2.86

6,385.91 3,587.19 327.24

0.41% 0.23% 0.02%

50 50 50

3,192.96 1,793.60 163.62

2.44 0.88

86.33 31.13

0.01% 0.00%

40 30

34.53 9.34

30.57 5.39 17.81

242.11 190.70 176.32

0.02% 0.01% 0.01%

20 30

48.42 57.21

235.62 301.08 43.39

1,305.33 535.92 1,030.95

0.08% 0.03% 0.07%

507.74 46.12 4.67

116.78 199.24 233.73

0.01% 0.01% 0.01%

51.01

1,518.06

0.10%

18.49

103.17

0.01%

9.78

236.48

0.02%

48.91 36.02 19.61 17.81 2.54

15,802.82 5,132.85 529.47 4,020.61 213.36

1.01% 0.33% 0.03% 0.26% 0.01%

40 60 70 50 50

6,321.13 3,079.71 370.63 2,010.31 106.68

31.99 292.05 51.46 2.86 17.40 29.07

2,687.16 45,559.80 25,093.95 1,381.38 391.50 1,133.73

0.17% 2.91% 1.60% 0.09% 0.02% 0.07%

70 60 60 60 80

1,881.01 27,335.88 15,056.37 828.83 313.20

34.94 1.95 3.65 39.59

6,149.44 429.00 1,606.00 4,354.90

0.39% 0.03% 0.10% 0.28%

90 80 90 70

5,534.50 343.20 1,445.40 3,048.43

10 20 10 30

614.94 85.80 160.60 1,306.47

4.47 26.88 290.20 377.60 2.29

1,966.80 4,838.40 290.20 377.60 1,419.80

0.13% 0.31% 0.02% 0.02% 0.09%

60 60 70 70

1,180.08 2,903.04 203.14 264.32

40 40 30 30 100

786.72 1,935.36 87.06 113.28 1,419.80

30.57 71.41

25.68 999.74

0.00% 0.06%

100 100

25.68 999.74

30.00 20.00 10.00

4,740.85 1,026.57 52.95

10.00

21.34

2,542.37 508.47 50.85 381.36 381.36

2,542.37 508.47 1,271.25 6,101.76 381.36

0.16% 0.03% 0.08% 0.39% 0.02%

100 100 50

2,542.37 508.47 635.63

50

190.68

11,850.00 1,969.96 6,000.00

11,850.00 1,969.96 6,000.00

0.76% 0.13% 0.38%

100 100 100

11,850.00 1,969.96 6,000.00

431.18 431.18

7,761.24 8,192.42

0.50% 0.52%

7.23 3.71

1,399.73 17,830.26

0.09% 1.14%

30.57 17.42 1,760.00

45.86 18.47 14,080.00

0.00% 0.00% 0.90%

70 60

0.78 1.49 8,100.00

975.00 13,329.73 8,100.00

0.06% 0.85% 0.52%

352.00

352.00

0.02%

1,566,184.45 234,927.668 156,618.445 1,957,730.563 352,391.5 2,310,122.064 115,506.103 2,425,628.167 2,425,628.17 2,425,628.17 100%

50 30 50

635.63 1,830.53 190.68

32.10 11.08

30 40 100

13.76 7.39 14,080.00

20

195.00

20

195.00

20

1,620.00

20

1,620.00

15.66%

245,254.32 36,788.15 24,525.43 306,567.90 55,182.22 361,750.12 18,087.51 379,837.63 379,837.63 379,837.63 15.66%

31.09%

486,904.61 73,035.69 48,690.46 608,630.76 109,553.54 718,184.30 35,909.22 754,093.52 754,093.52 754,093.52 31.09%

A

O HORIZONTE, DISTRITO DE LUCANAS, PROVINCIA DE LUCANAS, DEPARTAMENTO DE AYACUCHO" TIEMPO DE EJECUCION: FECHA :

MES 3 %

AVANCE

MES 4 %

AVANCE

MES 5 %

AVANCE 100 100 100 100

20 20

12,731.59 560.00

10 20

6,365.80 560.00

20

560.00

20 20

4,365.71 1,574.52

20 20

4,365.71 1,574.52

10 10

2,182.86 787.26

100 100 100 100

30 30 30 30 30

4,872.39 1,909.05 4,580.08 2,366.15 30,067.40

15 10 30 10 10

2,436.20 636.35 4,580.08 788.72 10,022.47

5 10

812.07 636.35

10 10

788.72 10,022.47

100 100 100 100 100

35 35 35 35 35

154,482.76 11,147.04 4,040.21 779.52 5,099.56

15 15 15 15 35

66,206.90 4,777.30 1,731.52 334.08 5,099.56

5 5 5 10 10

22,068.97 1,592.43 577.17 222.72 1,457.02

100 100 100 100 100

30 30

1,258.31 136.15

40 35

1,677.74 158.84

10 5

419.44 22.69

100 100

35 35 35 40

10,731.11 14,788.92 1,017.90 369.45

40 40 40 40

12,264.12 16,901.62 1,163.31 369.45

10 10 10 20

3,066.03 4,225.41 290.83 184.73

100 100 100 100

30 40 50 45

3,486.04 3,172.45 4,663.01 1,312.57

40 20 50 40

4,648.05 1,586.22 4,663.01 1,166.73

35 35 35 40

38,447.64 3,109.88 2,051.88 1,894.05

40 40 40 40

43,940.16 3,554.14 2,345.00 1,894.05

100 100 100 100 20 20 20 20

21,970.08 1,777.07 1,172.50 947.03

100 100 100 100

40 40 50

5,317.02 1,431.44 4,663.01

100 100 100

40 40 40 50

47,578.45 39,576.11 1,843.62 3,065.77

100 100 100 100

40 30 50 30 40 50

361.78 118.89 133.12 19.17 61.68 1,383.17

100 100 100 100 100 100

40 30 30 40 30

61.37 119.78 117.95 1,143.81 2.58

30 30 50

500.83 16.25 531.90

100 100 100

30 30 20 50

2,668.68 2,056.72 910.80 58.91

100 100 100 100

50 50 40

2,000.50 178.43 962.77

100 100 100

20 40 40 20 40

30.68 159.71 157.27 571.91 3.44

100 100 100 100 100

100 100 100 100 100 100 100 100 100 100

20 40

55.84 40.28

100 100

20 20

216.56 123.34

100 100

100 100

50

781.49

40 40 40

2,554.36 1,434.88 130.90

10 10 10

638.59 358.72 32.72

100 100 100

40 50

34.53 15.57

20 20

17.27 6.23

100 100

70 60

169.48 114.42

10 10 100

24.21 19.07 176.32

100 100 100

40 30 30

522.13 160.78 309.29

40 30 30

522.13 160.78 309.29

20 40 40

261.07 214.37 412.38

100 100 100

50 50 70

58.39 99.62 163.61

50 50 30

58.39 99.62 70.12

100 100 100

100

1,518.06

100

100

103.17

100

100

236.48

100

30 20 20 50 40

4,740.85 1,026.57 105.89 2,010.31 85.34

100 100 100 100 100

30 40 40 40 20 100

806.15 18,223.92 10,037.58 552.55 78.30 1,133.73

100 100 100 100 100 100

100 100 100 100 100 100 100 100 100 100 100

30

1,830.53

40

100 100 100 100 100

2,440.70

100 100 100

20 20

1,552.25 1,638.48

80 80

6,208.99 6,553.94

100 100

10 10

139.97 1,783.03

90 90

1,259.76 16,047.23

100 100 100 100 100

20

195.00

20

1,620.00

31.35%

491,010.36 73,651.55 49,101.04 613,762.95 110,477.33 724,240.28 36,212.01 760,452.29 760,452.29 760,452.29 31.35%

20 20 20

14.13%

195.00 2,665.95 1,620.00

221,356.99 33,203.55 22,135.70 276,696.23 49,805.32 326,501.56 16,325.08 342,826.63 342,826.63 342,826.63 14.13%

20 80 20

195.00 10,663.78 1,620.00

100 100 100

100

352.00

100

7.75%

121,306.18 18,195.93 12,130.62 151,632.72 27,293.89 178,926.61 8,946.33 187,872.94 187,872.94 187,872.94 7.75%

100%

6 MESES ENERO 2019

CRONOGRAMA DE DESEMBOLSOS

"CREACIÓN DE PISTAS Y VEREDAS EN LAS CALLES PRINCIPALES Y PERIMETRO DEL PARQUE PRINCIPAL DEL BARR PROVINCIA DE LUCANAS, DEPARTAMENTO DE AYACUCHO"

DIAS ADELANTOS CALENDARIO EFECTIVO MATERIALES 40% (1) (2) 0 0.00 626,473.78 30 0.00 -98,201.73 60 0.00 -194,761.84 90 0.00 -196,444.14 120 0.00 -88,542.79 150 0.00 -48,523.27 0.00

0.00

TOTAL ( 1 + 2) 626,473.78 -98,201.73 -194,761.84 -196,444.14 -88,542.79 -48,523.27

VALORIZ. PRESUP. (3) 0.00 245,254.32 486,904.61 491,010.36 221,356.99 121,306.18

0.00

1,565,832.45

A DE DESEMBOLSOS

O DEL PARQUE PRINCIPAL DEL BARRIO NUEVO HORIZONTE, DISTRITO DE LUCANAS, DEPARTAMENTO DE AYACUCHO"

PARCIAL ( 1+2+3 ) 626,473.78 147,052.59 292,142.77 294,566.21 132,814.19 72,782.91 1,565,832.45

DESEMBOLSOS IGV ( 18 % ) TOTAL DE ( 1+2+3) 112,765.28 739,239.06 26,469.47 173,522.06 52,585.70 344,728.46 53,021.92 347,588.13 23,906.55 156,720.75 13,100.92 85,883.83 281,849.84

1,847,682.29

% 40.01% 9.39% 18.66% 18.81% 8.48% 4.65% 100.00%

Related Documents

Cronograma
May 2020 29
Cronograma
August 2019 56
Cronograma
June 2020 8
Cronograma
May 2020 10
Cronograma
November 2019 33
Cronograma
June 2020 8

More Documents from ""

Cronograma Valorizado.xls
November 2019 12
Trabajo Construcciones
April 2020 16
Biografias.docx
May 2020 19
August 2019 15
Horario 5 Nivel.png.docx
December 2019 14