Backbone Cables To

Equipment Cable Ducts

Backbone Cables From Building Entrance Area

System Common Equipment

Building Distribution System Common Equipment Cabling

Distribution Cross-Connect a101.126a S

Wall Strap

Cable Tied To Steel Support Strand

Sleeve

Cable Clamp

Floor Bracket

Slot

Cable Clamped To Steel Support Strand

Main Backbone Conduit Extending Through Basement Area

Cable Rack

Backbone Cable

Horizontal Telecommunications Closet Cable

IO IO

IO

Information Outlet (IO)

From TC

25-Pair or bundle of 4-pair Horizontal Zone Cable

Consolidation Point

IO

4-Pair Extension Cable

4-Pair Extension Cable

IO

Header Raceway For Communications Wiring

Communications Wiring

Lateral Raceway For Communications Wiring

Power Cable

Lateral Raceway For Power Wiring

Header Raceway For Power Wiring Jack

a101.120a S

a101.121a S

Outlet Box For Jack

To Backbone Closet

Outlet Box For Power

Access Plate

300 ft (91m)

Core Area 200 ft (61m)

Telecommunication Closets

a101.02b S

Cell For Communications Wiring

Header Duct With Removable Plates

Cell For Electrical Wiring

Floor Plates Removed To Gain Access To Cable

Locking Pedestal

Flush-Mounted Satellite Cabinet IOs

IO

a101.125a S

SATELLITE CABINET

CONDUIT

BASEBOARD RACEWAY FRONT PANEL

POWER AND COMMUNICATIONS CABLE (SEPARATED CHANNELS BY tab2.# PARTITIONS)

When Possibility Exists That Metallic Conduit Will Come In Contact With Building Reinforcing, Insulation Around Duct Is Necessary. Ground Level

Provide 4″ (102 mm) Recess When Possible

Coupling 2X Diameter Of Conduit

Inside Wall

Concrete Wall Footing

Duct Extended to Undisturbed Earth to Avoid Duct To Pole, Shearing Manhole Or Property Line

Duct Section Placed Through Wall At Time Of Construction Reinforcing V-Cut Trench or Shored Straight Trench

a101.44b S

Plywood For Terminal Or Splice Location

Ground Level

8″ (203 mm)

Foundation Slab

24″ Min. (610 mm)

To Alternate Location

Radius Adapter

Minimum Drop of 1 Inch per Foot