18.04.00

POZOS A TIERRA

18.04.01

POZO A TIERRA

PZA

2.00

693.18

18.04.02

CABLE DESNUDO 16 MM2 P/POZO A TIERRA

ML

12.00

8.10

18.04.03

CABLE DESNUDO 25 MM2 P/POZO A TIERRA

ML

9.00

10.10

17.05.01 POZO A TIERRA Rendimiento (PZA/día)

1.0000

Materiales 040102

TIERRA CERNIDA

M3

0.000

1.0000

740208

CURVA PVC 1"

PZA

0.000

1.0000

740601

TUBO PVC SEL 1"X3 MTS.

PZA

0.000

4.0000

830119

ELECTRODO COOPERWELD

PZA

0.000

1.0000

830121

DOSIS QUIMICA DE THORGEL

BLS

0.000

6.0000

830122

MARCO Y TAPA DE CONCRETO

PZA

0.000

1.0000

830123

CONECTOR AB DE 5/8"

PZA

0.000

2.0000

830143

SUBCONTR. MANO DE OBRA P/POZO DE TIERRA

UND

0.000

1.0000

HH

0.500

4.0000

%MO

0.000

5.0000

Mano de obra 470101

CAPATAZ Equipo

370101

HERRAMIENTAS MANUALES

17.05.02 CABLE DESNUDO 16 MM2 P/POZO A TIERRA Rendimiento (ML /día)

1.0000

Materiales 750106

TUBO PVC SEL (E/C) 1 1/2" X 3.00 M.

PZA

0.000

0.3500

830198

CABLE DESNUDO 16 MM2

ML

0.000

1.0000

17.05.03 CABLE DESNUDO 25 MM2 P/POZO A TIERRA Rendimiento (ML /día)

1.0000

Materiales 750106

TUBO PVC SEL (E/C) 1 1/2" X 3.00 M.

PZA

0.000

0.3500

830197

CABLE DESNUDO 25 MM2

ML

0.000

1.0000

1,386.36 97.20 90.90

693.18 10.00

10.00

0.00

7.00

7.00

0.00

2.83

11.32

0.00

70.00

70.00

0.00

46.61

279.66

0.00

80.00

80.00

0.00

30.00

60.00

0.00

150.00

150.00

667.98

6.00

24.00

24.00

24.00

1.20

1.20

8.10 6.00

2.10

0.00

6.00

6.00

8.10

10.10 6.00

2.10

0.00

8.00

8.00

10.10

18.04.00

POZOS A TIERRA

18.04.01

POZO A TIERRA

PZA

2.00

18.04.02

CABLE DESNUDO 16 MM2 P/POZO A TIERRA

ML

12.00

693.18 8.10

18.04.03

CABLE DESNUDO 25 MM2 P/POZO A TIERRA

ML

9.00

10.10

17.05.01 POZO A TIERRA Rendimiento (PZA/día)

1.0000

Materiales 040102

TIERRA CERNIDA

M3

0.000

1.0000

740208

CURVA PVC 1"

PZA

0.000

1.0000

740601

TUBO PVC SEL 1"X3 MTS.

PZA

0.000

4.0000

830119

ELECTRODO COOPERWELD

PZA

0.000

1.0000

830121

DOSIS QUIMICA DE THORGEL

BLS

0.000

6.0000

830122

MARCO Y TAPA DE CONCRETO

PZA

0.000

1.0000

830123

CONECTOR AB DE 5/8"

PZA

0.000

2.0000

830143

SUBCONTR. MANO DE OBRA P/POZO DE TIERRA

UND

0.000

1.0000

HH

0.500

4.0000

%MO

0.000

5.0000

Mano de obra 470101

CAPATAZ Equipo

370101

HERRAMIENTAS MANUALES

17.05.02 CABLE DESNUDO 16 MM2 P/POZO A TIERRA Rendimiento (ML /día)

1.0000

Materiales 750106

TUBO PVC SEL (E/C) 1 1/2" X 3.00 M.

PZA

0.000

0.3500

830198

CABLE DESNUDO 16 MM2

ML

0.000

1.0000

17.05.03 CABLE DESNUDO 25 MM2 P/POZO A TIERRA Rendimiento (ML /día)

1.0000

Materiales 750106

TUBO PVC SEL (E/C) 1 1/2" X 3.00 M.

PZA

0.000

0.3500

830197

CABLE DESNUDO 25 MM2

ML

0.000

1.0000

1,386.36 97.20 90.90

693.18 10.00

10.00

0.00

7.00

7.00

0.00

2.83

11.32

0.00

70.00

70.00

0.00

46.61

279.66

0.00

80.00

80.00

0.00

30.00

60.00

0.00

150.00

150.00

667.98

6.00

24.00

24.00

24.00

1.20

1.20

8.10 6.00

2.10

0.00

6.00

6.00

8.10

10.10 6.00

2.10

0.00

8.00

8.00

10.10

PRESUPUESTO DE OBRA OBRA

POZO A TIERRA

PROPIETARIO

COLEGIO ALGARROBOS

FECHA

18-May-09

ITEM 01.00.00 01.01.00 01.01.01 01.01.02 01.01.03 01.02.00 01.02.01 01.03.00 01.03.01 01.04.00 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05 02.00.00 02.01.00 02.02.00

PARTIDA

UNIDAD METRADO PRECIO

POZOS A TIERRA MOVIMIENTO DE TIERRAS EXCAVACION PARA POZO A TIERRA ELIMINACION DE MATERIAL EXCEDENTE TIERRA CERNIDA PARA POZO A TIERRA MARCO Y TAPA MARCO Y TAPA DE CONCRETO INSTALACION DE POZO A TIERRA INSTALACION MANUAL DE POZO A TIERRA ACCESORIOS CURVA PVC 1" TUBO PVC SEL 1"X3 MTS. ELECTRODO COOPERWELD DOSIS QUIMICA DE THORGEL CONECTOR AB DE 5/8" CABLE DESNUDO 16 MM2 P/POZO A TIERRA TUBO PVC SEL (E/C) 1 1/2" X 3.00 M. CABLE DESNUDO 16 MM2 COSTO DIRECTO GG. Y UU. TOTAL

PARCIAL SUB TOTALES

50.00 M3 M3 M3

1.00 2.00 1.00

10.00 15.00 10.00

10.00 30.00 10.00

PZA

1.00

80.00

80.00

GLB

1.00

175.00

175.00

PZA PZA PZA BLS PZA

1.00 4.00 1.00 6.00 2.00

7.00 2.83 70.00 46.61 30.00

7.00 11.32 70.00 279.66 60.00

0.35 1.00

6.00 6.00

2.10 6.00

80.00 175.00 427.98

8.10 PZA ML

S./ S./

741.08 111.16 852.24