Control Sheet Rwad.xls

  • Uploaded by: rawad
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Control Sheet Rwad.xls as PDF for free.

More details

  • Words: 1,332
  • Pages: 9
CHEMICAL TREATMENT CONTROL SHEET December 2010

JOFRA FIELD Field: JOFRA Company: HAROUGE OIL OPERATIONS Attention: PROD. SPV. JOFRA FIELD

Date: January 27, 2011

Copy to: PROD DEPT./ INSTR. SECT. JOFRA, ELECTRICAL DEP. JOFRA, FILE Treatment Chemical

Location

QPD

Inj. status

Tank level%

Top up tank

REMARKS

CORROSION CONTROL Main Stn. Prod. Sep. " Test Sep. Main St. prod + JJ Line to Tank JJ Stn. Bulk Separator " Test Separator " Tanks Upstream

EC1180A " EC1213A EC1180A " EC1213A

5 1 3

ok ok ok

50 85

DEMULSIFICATION

9/30/2008

Production rates

Location Crude

Main St. JJ St. TOTAL

EC-2168A

Main Stn. Prod. Sep. " Test Sep. JJ Stn. Bulk Separator " Test Separator

Water Gross bls/day

Dem. Dosage EC-2168A (ppm)

-

-

-

-

747 747

3067 3067

3814 3814

12

8 1

ok

Crude Quality test results 22/11/2010 Shipping

Main Stn. JJ Stn.

Salinity

BS&W %

API gravity

-

-

-

26.3

0.15

40.0

Actual

Target

ppm

ppm

###

8

### 7.8

20 8

23.9

20

###

10

12.5

12

CHEMICAL TREATMENT CONTROL SHEET

TIBISTI FIELD Field: Company: Attention: Copy to:

TIBISTI Date: 22-Jan-11 HAROUGE OIL OPERATIONS TIBISTI FIELD SPT. PROD. Spv; Prod Eng.; Corrosion; Instrument Sect.; Planning / TIBISTI Treatment Chemical QPD

LOCATION

Inj. status

Tank level %

Top up tank

REMARKS

CORROSION CONTROL Main Stn. Prod. Sep. 1 " Prod. Sep. 2 " Test Separator Main Stn. Prod. Sep. 1 " Prod. Sep. 2 " Tank Inlet HH Station Prod. Sep. " Test Sep. " Tank Inlet CC Station Prod. Line " Test Sep. Wellside DD - 1 " BB - 1 " " " I-1 " " " I-2 " " " I - 41

EC1180A " " EC6165A " EC1213A EC1180A " EC1213A EC1180A " EC1180A EC6165A JV 010 EC1181A EC6165A EC1181A EC6165A EC6333A

Main Stn. Prod. Sep. 1 " Prod. Sep. 2 " Test Separator HH Station Prod. Sep. " Test Sep. CC Station Prod. Line

10 2 11 19 2 2 2 2 1 1

maintenance work at separation vessele NO. 2 OK OK OK OK OK OK OK OK OK S/B S/B

11 6 4

OK OK OK DEMULSIFICATION

18 2 1 1 1

maintenance work at separation vessele No. 2 OK OK OK

Pumps to be checked (maintenance required):

Chemical stock at Yard Chemical EC-1180A EC-1181A EC-1213A EC-6198A

drum 7 17 4 12

Chemical EC-6165A JV-010 EC-6333A EC-2168A

Crude Oil Quality Tests Location Main Stn. Shipping L. HH Stn. Prod. Sep. CC Stn.

Productions 0n November 23 HH St (Bbls/day) CC St Main St TOTAL:

Crude 452 99 1905 2456

Water 11 260 3834 4105

Net crude oil shipped: Tibisti Prod: Dor Marada: Shipped:

Salt (PTB) 8.3 N/A N/A

Gross 463 359 5739 6561

BS & W% 0 N/A N/A

I1 I2 BB1 DD1

API 48.0 N/A N/A

Crude

Water

120

1280

99

260

Note: 2456 2857 5313

bls/day bls/day bls/day Nalco Rep: Nabil Aliwan

Gross 0 1400 0 359

drum 9 9 4 0

CHEMICAL TREATEMENT CONTROL SHEET

EN NAGA FIELD Field: Company: Attention: Copy to:

Date:

EN NAGA HAROUGE OIL OPERATIONS EN NAGA FIELD SUPERINTENDENT PROD. SUPERVISOR, PLANNING / EN NAGA; FILE

LOCATION

Treatment required Chemical

quarts/day

1/24/2011

Tank

Injection

REMARKS

level cm

status

actual injection status

CORROSION CONTROL 7 7

EC-1180A

B-1B B-5 B-6 B-7 B-9 Q-2 TOTAL Injection: LP separator EC-1213A

OK OK S/B S/B OK

5 19 12

S/B 120

OK PARAFFIN CONTROL

HP separator Shipping line

EC-6333A

10 20

Pl. Water Tank EC-6213A

15

Test separator HP separator

JV 010

4 L/hour 28 L/hour

Raw water inl. N-7399 Comments: EC-1180A EC-1213A EC-2216A EC-6333A EC-6213A JV 010

5

OK OK OXYGEN SCAVENGER 104 OK BIOCIDE APPLICATION OK 100% OK SCALE CONTROL (RAW WATER) 90

50%

The above dosing rates are calculated for the actual productions

Drum

Corrosion inhibitor maintaned at 18 ppm of dosage at W/H locations Corrosion inhibitor is injected at upstream of LP separator EC-2216A Demulsifier is injected at opstream of Test, HP, LP Separators and Q1 WellHwed location. EC-1180A Recommended dosage depending on the operational and weather conditions. EC-1213A Oxygen scavenger application introduced at upstream of Plant Water Tank A-22F Biocide application introduced at upstream of Manifolds. EC-6333A N-7399 EC-6213A JV 010

Note: It's highly recommended to start chemical treatment at well B-12

The actual welltest data: WELL B-1B B-1Z B-3 B-4 B-5 B-6 B-7

Chemical stock

Crude 106 447 260 0 1314 0 0

6 8 2 0 4 12 14 1

Dosing rates

ppm

EC-1180A EC-1213A

12 10

production bls/day

Water 63 0 0 0 104 0 0

Total 169 447 260 0 1418 0 0

WELL B-8 B-9 B-12 B-13 B16 J-1-85 Q-2 B-20 Total

Crude 0 0 488 1162 277 0 2776 440 7270

Nalco Rep:

Water 0 0 1055 108 0 0 740 0 2070

Nabil Aliwan

Total 0 0 1543 1270 277 0 3516 440 9340

RKS

on status

EC-1149A L/day

19

qts/day 12 ppm

12

qts/day 10 ppm

ml/min round number

0.34 0.90 0.44 0.00 2.86 0.00 0.00

0.24 0.63 0.30 0.00 1.98 0.00

0.00

0.00 0.00

0

0.39

0

3.54

10

0.00

0.00

1 1 1 1 3 1 2 0

3.11 2.56 0.56 10.21

NALCO CHEMICAL TREATMENT GHANI FIELD Field: GHANI Date: 1/4/2012 Company: HAROUGE OIL OPERATIONS Copy to: GHANI/ZENAD/GIR FACHA/TAGRIFET OPERATORS, FILE

LOCATION Ghani Group Separator A " Group Separator B " Test Separator A " Test Separator B " Heater A " Heater B " Wash Water Line RRR 13 & 17 6" Prod Line RRR 13 & 17 14" Prod Line " Test Sep. RRR 30 RRR 17 Manifold Ed Dib Prod Line " Test Sep. " GG 2 " GG 1 Zenad Sweet Sep. 402 " Test Line " Gas Boot Inlet " Heater-Treater 411 " Heater-Treater 412 " Heater-Treater 424 Tagrifet Prod. Sep. " Test Sep. " Gas Boot Inlet " TTT 5 M Prod. Line " TTT 5 M Test. Line Facha Prod. Sep. " Test Sep. " Gas Boot Inlet

Location Ghani Separator A Ghani Separator B Ghani test A&B Zenad Sweet Sep 402 Heater-Treater 411 Heater-Treater 412 Heater-Treater 424 RRR 13 & 17 (6" line) RRR 13 & 17 (8" line) RRR 30 Ed Dib Tagrifet Facha Total net oil

Treatment Inj. Chemical QPD status CORROSION CONTROL 2 OK 11 OK EC1180A 2 OK EC6146A EC6213A EC1180A EC9242A EC1180A

2 12 45 2 17 1 7 31 9 1

REMARKS Injection pump status

" " OK " " OK OK "

EC6165A EC1180A EC1213A EC6146A

7 2 72 6 28

OK " " OK "

EC1180A

EC1180A

4 1 3 1 1 2 1 2

" " OK " "

Chemical Treatment Suspended

Bbls/day 1,167 10,372 6,643 4,552 18,825 1,201 11,713 5,018 6,394

33,478

Nalco Rep: Nabil Aliwan- Emad Hamoda

CHEMICAL TREATMENT CONTROL SHEET

FARRUD & GIR PRODUCED WATER INJECTION Field: Ghani Company: HAROUGE OIL OPERATIONS Treatment Inj. Pump Chemical

ppm

rate:L/hour

Date: 10-Aug-09 Injection

Tank

status

level %

REMARKS

GHANI CPF, PRODUCED WATER EC6165A

Scale Inh.

10

0.2

EC1180A

Corr. Inh.

10

0.2

EC6029A

Rev. Dem.

10

0.2

EC6213A

Oxygen Scav.

5

0.1

96JV010

Biocide

75

1.2

EC6176A

Filter Aid

1

Not in use

During shock treatment: 500 ppm Not in use

ZENAD PRDUCED WATER EC6165A

Scale Inh.

10

0.1

EC1180A

Corr. Inh.

6

0.1

EC6029A

Rev. Dem.

10

0.1

EC6213A

Oxygen Scav.

5

0.1

96JV010

Biocide

75

1.0

Not in use

During shock treatment: 500 ppm

FARRUD WATER INJECTION FS A-22-F

Surfactant

96JV010

Biocide

EC6176A

Filter Aid

1

0.3

EC6029A

Rev. Dem

0.25

0.1

25 - 175

During backwash During shock treatment: 500 ppm

Not in use.

GIR WATER INJECTION FS N-71605

Polielectrolite

96JV010

Biocide

EC6176A

Filter Aid

1

0.1

EC1149A

Corr. Inh.

10

1.0

EC6165A

Scale Inh.

10

1.0

EC6213A

Oxygen Scav.

5

0.5

1.2

0.3 During shock treatment: 500 ppm

Ghani Produced Water Zenad Produced Water Augila Water Farrud Water Injection FS Gir Water Injection Plant

2,500 2,000 35,400 39,700 15,500

Not in use

Not in use.

bbls/day bbls/day bbls/day bbls/day bbls/day

Istvan Juhasz

Related Documents


More Documents from ""

Readme.txt
May 2020 3
June 2020 2
Attachme6nt.pdf
May 2020 3