CONTRACT CHECK LIST 512319

PROJECT :3894

P.O. #B-

Specification# 011100-5 & 6 109 Please see attached Dow Corning and Protech Material Safety Data Sheet For epoxy paint, firestop foam. Specification# 013323-4 102.1a - Please see attached Specification Guide. Specification# 013323-4 102.1d - Please see attached Specification Guide and our previously submitted 3894 Technical. Specification# 013323-4 102.1f1 - Please see attached previously submitted 3894 Technical. Specification# 013323-4 102.1g - Please see attached Technibus Test Procedure. Specification# 013323-5 102.3a8 - Gaskets are shown and listed on our equip. Termination drawings and ship loose list. Specification# 013323-6 102.4a2.1 - This information is supplied on our Layouts, termination drawings and installation Manual. Specification# 013323-6 102.4a2.2 - The erection sequence schedule should be supplied by the installing contractor based upon what terminating equipment that is installed or will be installed. Specification# 013323-6 102.4a2.5 - See attached Certifications. Specification# 013323-6 102.4a2.7 - Shipping sections and identifications numbers are shown on the layout drawings and Correspond with the shiploose list. For the center of gravity see equipment handling Instructions located in the Installation manual. Specification# 013323-7

Table 1-2 - See attached Bar Chartrv6. The erection sequence schedule should be supplied by the installing contractor based upon what terminating equipment that is installed or will be installed. Specification# 013323-8 104.3 - Autocad 2010 drawing CD’s and one full size print of each will be submitted 11-25-09.

Related Documents

Contract Check List
June 2020 5
Contract Start Check List
August 2019 34
Check List
August 2019 69
Check List
May 2020 39
Check List
May 2020 30
Check List
August 2019 49