Contract Agreement- Painting.docx

  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Contract Agreement- Painting.docx as PDF for free.

More details

  • Words: 447
  • Pages: 2
CONTRACT AGREEMENT KNOW ALL MEN BY THESE PRESENTS: This contract of services executed and entered into by and between: AMPARO C. ZAMORA herein referred to as CONTRACTEE, with an address of Petaluma, California, USA, represented by RUBY B. SEBASTIAN with address at Butao, Malasiqui, Pangasinan. -and-

JOJIE SINDAYEN herein referred to as the private CONTRACTOR, with address at Brgy. Viado, Malasiqui, Pangasinan.

WITNESSETH

WHEREAS, the CONTRACTEE is interested in engaging the services of the CONTRACTOR for the REPAINITNG of ROOF and POSTS TRUSSES and STEEL MATTINGS of the CATALINO D. CEREZO NATIONAL HIGH SCHOOL GYMNASIUM located at Malimpec, Malasiqui, Pangasinan, according to the contractee’s desired specifications; WHEREAS, the CONTRACTOR manifests that he possesses the necessary skills and expertise to perform the said work and has agreed to perform the services herein after contracted; NOW THEREFORE, for and in consideration of the premises and of the mutual covenants and stipulations hereinafter set for the, the parties have agreed and do hereby agree that;

I.

OBLIGATIONS OF THE PARTIES The CONTRACTOR shall 1. Provide the necessary scaffolds and ladders for the said work including its mobilization. 2. Provide necessary safety precautions on the work site 3. Prepare the work site for painting which includes washing (as needed), removing of rust, removing of loose and peeling of paint, sanding and buffing, and apply primer. 4. Place 2 coats of ______________ of _________ type of paints. 5. Clean any drips or spills and over painting and remove all CONTRACTOR’S materials and debris from the CONTRACTEE’S work site at the completion of the contract. 6. Finish and complete the work within 15 working days.

The CONTRACTEE shall 1. Provide the necessary painting materials like paints and painting consumables to the CONTRACTOR for the completion of the said project. 2. Reserve the right to have its authorized representative make periodic inspection of the work and make necessary retouching of any portion needed. 3. Pay the contractor the amount of FORTY EIGHT THOUSAND FIVE HUNDRED PESOS (P 48, 500.00) in the following manner: II. CONTRACT AMOUNT FOR, AND lN CONSIDERATION of the services to be rendered, the CONTRACTEE shall pay the CONTRACTOR the total amount of FORTY EIGHT THOUSAND FIVE HUNDRED PESOS (P 48, 500.00) III. DISPUTE RESOLUTION Any discrepancies/differences or disagreements of any kind whatsoever which shall arise between the parties in connection with the implementation of this contract shall be resolved amicably by both parties. IN WITNESS WHEREOF, the parties have hereunto signed this agreement on the ______ day of _________________, 201 at Malasiqui, Pangasinan

__________________________________ RUBY B. SEBASTIAN

________________________ JOJIE SINDAYEN

MT-1, CATALINO D. CEREZO NATIONAL HIGH SCHOOL

CONTRACTOR

(Representative of AMPARO C. ZAMORA)

Signed in the presence of:

____________________________________

______________________________

Related Documents