Contoh Laporan Mingguan Proyek Sei. Kelik - Siduk Kalimantan Barat

  • Uploaded by: ari susanto
  • 0
  • 0
  • August 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Contoh Laporan Mingguan Proyek Sei. Kelik - Siduk Kalimantan Barat as PDF for free.

More details

  • Words: 9,887
  • Pages: 91
Rutin Jalan

Terhadap Induk

Rutin Jembatan

Terhadap Induk

Rekonstruksi

Terhadap Induk

Umum

file:///conversion/tmp/scratch/416541299.xlsx

RENCANA PROGRESS REALISASI PROGRESS DEVIASI RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : : : : :

59.952 ( 35.693 ( ### ( ( ( - (

% % % % % %

) ) ) ) ) )

RENCANA PROGRESS REALISASI PROGRESS DEVIASI RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : : : : :

58.629 ( 25.642 ( ### ( ( ( - (

% % % % % %

) ) ) ) ) )

RENCANA PROGRESS REALISASI PROGRESS DEVIASI RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : : : : :

61.697 ( 9.746 ( ### ( ( ( - (

% % % % % %

) ) ) ) ) )

RENCANA PROGRESS : REALISASI PROGRESS : DEVIASI :

59.921 ( % ) 10.320 ( % ) ### ( % )

FORM LAPORAN MINGGUAN ke KASATKER P2JN NAMA PAKET

:

Paket 9, Pengawasan Teknis Preservasi Rekonstruksi Jalan dan Penggantian Jembatan Sei. Kelik - Siduk

NO. KONTRAK

:

117/HK.02.03/SATKERP2JN-KB/I/2018

TANGGAL KONTRAK

:

Friday, January 05, 2018

NO. SPMK

:

146 /HK.01.24/SATKER P2JN- KB/I/2018

TANGGAL SPMK

:

###

NAMA SE

:

Ir. Totok Kusmanto

PRESERVASI DENGAN CARA LONG SEGMENT No

JENIS PEKERJAAN

1

Pekerjaan Rutin Jembatan

RENCANA (%)

PROGRES REALISASI (%)

DEVIASI (%)

58.629

25.642

-32.987

PERMASALA USULAN TEKNIS UNTU

Segera dilakukan pembers

STRIPMAP RENCANA STRIPMAP RUTIN JEMBATAN Sta 0+000 / KM 360+620

Sta 7+390 / KM 375+105

Sta 0+105 / KM 367+715 Sta 35+005 / KM 395+625

Sta 54+948 / KM 415+568

Sta 15+070 / KM 375+690

Sta 38+825 / KM 399+445

Sta 35+690 / KM 396+310

Sta 20+797 / KM 381+417

Sta 57+515 / KM 418+135

Sta 22+510 / KM 383+130

Sta 40+775 / KM 401+395

Sta 39+290 / KM 399+910

Sta 28+803 / KM 389+423

Sta 59+662 / KM 420+282

Sta 30+550 / KM 391+170

Sta 44+031 / KM 404+651

Sta 43+903 / KM 404+523

Sta 31+280 / KM 391+900

Sta 32+054 / KM 392+67

Sta 45+820 / KM 406+440

Sta 44+626 / KM 405+246 Sta 61+700 / KM 422+320

Sta 51+51

Sta 48+263 / KM 408+88

Sta 57+025 / KM 417+645

Sta 58+650 / KM 419+270

Sta 60+315 / KM 420+935

STRIPMAP REALISASI SAMPAI DENGAN MINGGU KE 30 STRIPMAP RUTIN JEMBATAN Sta 0+000 / KM 360+620

Sta 7+390 / KM 375+105

Sta 0+105 / KM 367+715 Sta 35+005 / KM 395+625

Sta 54+948 / KM 415+568

Sta 15+070 / KM 375+690

Sta 38+825 / KM 399+445

Sta 35+690 / KM 396+310

Sta 43+903 / KM 404+523

Sta 31+280 / KM 391+900

Sta 30+550 / KM 391+170

Sta 44+031 / KM 404+651

Sta 59+662 / KM 420+282

Sta 58+650 / KM 419+270

Keterangan : Jembatan Dalam Kondisi Sudah Ditangani

Sta 28+803 / KM 389+423

Sta 22+510 / KM 383+130

Sta 40+775 / KM 401+395

Sta 39+290 / KM 399+910

Sta 57+515 / KM 418+135

Sta 57+025 / KM 417+645

Sta 20+797 / KM 381+417

Sta 32+054 / KM 392+67

Sta 45+820 / KM 406+440

Sta 44+626 / KM 405+246 Sta 61+700 / KM 422+320

Sta 60+315 / KM 420+935

Jembatan Dalam Kondisi Belum Tertangani

Sta 51+51

Sta 48+263 / KM 408+88

GUAN ke KASATKER P2JN

N CARA LONG SEGMENT PERMASALAHAN dan USULAN TEKNIS UNTUK PENYEDIA JASA Segera dilakukan pembersihan jembatan kembali

P RENCANA

UTIN JEMBATAN Sta 33+620 / KM 394+240

Sta 32+054 / KM 392+674

Sta 34+525 / KM 395+145

Sta 51+510 / KM 412+130

Sta 48+263 / KM 408+883

Sta 52+415 / KM 413+035

MPAI DENGAN MINGGU KE 30

UTIN JEMBATAN Sta 33+620 / KM 394+240

Sta 32+054 / KM 392+674

Sta 34+525 / KM 395+145

Sta 51+510 / KM 412+130

Sta 48+263 / KM 408+883

Sta 52+415 / KM 413+035

FORM LAPORAN NAMA PAKET

: Paket 9, Pengawasan Teknis Preservasi Rekonstruksi Jalan dan Penggantian Jembatan Sei. Kelik - Siduk

NO. KONTRAK

: 117/HK.02.03/SATKERP2JN-KB/I/2018

TANGGAL KONTRAK

: 05 Januari 2018

NO. SPMK

: 146 /HK.01.24/SATKER P2JN- KB/I/2018

TANGGAL SPMK

: 08 Januari 2018

NAMA SE

: Ir. Totok Kusmanto

PRESERVASI DENGAN CARA LONG SE NO

JENIS PEKERJAAN

1

PEKERJAAN RUTIN JALAN

RENCANA (%)

PROGRES REALISASI (%)

59.952

35.693

DE

STRIPMAP RENCANA STRRIPMAP RUTIN JALAN KM 360+620 TUGU KELIK

KM 368+845

KM 370+945

-

KM 366+995 KM 375+690

KM 375+920 KM 379+130

KM 376+270 KM 379+410

KM 379+295 KM 383+595

KM 370+045 KM 376+770

KM 367+970 KM 376+070

KM 377+120 KM 379+840

KM 379+470 KM 383+670

KM 371+920 KM 377+445

KM 380+510

KM 380+295 KM 383+765

KM 384+145

KM 383+650

KM 383+695

KM 383+795

KM 385+895

KM 386+170

KM 386+070 KM 388+120

KM 386+470 KM 383+670

KM 388+220

KM 391+625

KM 386+970

KM 387+070 KM 388+620

KM 388+395

KM 392+195

KM 387+170

KM 389+920

KM 388+770

KM 392+720

KM 393+020

KM 392+020 KM 383+595

KM 392+420 KM 395+145

KM 394+920 KM 398+020

KM 395+620

KM 395+470 KM 398+520

KM 398+370

KM 392+970 KM 396+570

KM 396+320 KM 400+120

KM 398+870

KM 400+570

KM 400+245 KM 410+120

PAKET TAHUN 2018

Keterangan : Badan Jalan kondisi baik / Mantap Bahu Jalan kondisi baik / Mantap Drainase kondisi baik / Mantap

Lokasi Kerusakan Lokasi Penanganan Lokasi Sudah Tertangani

Lokasi Badan Jalan Kondisi Sudah Tertimbun Tanah

STRIPMAP REALISASI SAMPAI DENGAN STRRIPMAP RUTIN JALAN KM 360+620 TUGU KELIK

KM 368+845

KM 366+995 KM 375+690

KM 379+130

KM 370+045 KM 376+770

KM 367+970 KM 376+070

KM 375+920

KM 370+945

KM 376+270 KM 379+410

KM 371+920 KM 377+445

KM 377+120 KM 379+840

KM 380+510

KM 379+295 KM 383+595

KM 379+470 KM 383+670

KM 383+650 KM 385+895

KM 383+765

KM 383+695 KM 386+170

KM 386+070 KM 388+120

KM 380+295

KM 383+795 386+970

KM 386+470 KM 388+670

KM 384+145

KM 387+170

KM 387+070 KM 388+920

KM 389+920

KM 388+220

KM 388+395

KM 388+770

KM 391+625

KM 392+195

KM 392+020 KM 383+595

KM 392+420 KM 395+145

KM 394+920 KM 398+020

KM 392+720

KM 392+970 KM 395+620

KM 395+470 KM 398+520

KM 393+020

KM 396+570

KM 396+320 KM 400+120

KM 400+570

KM 398+370

KM 398+870

KM 400+895

KM 400+245 KM 410+120

PAKET TAHUN 2018

KM 401+120

Keterangan : Badan Jalan kondisi baik / Mantap Bahu Jalan kondisi baik / Mantap Drainase kondisi baik / Mantap

Lokasi Kerusakan Lokasi Penanganan Lokasi Sudah Tertangani

Lokasi Badan Jalan Kondisi Sudah Tertimbun Tanah Realisasi Marka jalan Realisasi Timbunan Pilihan

M LAPORAN MINGGUAN

n Sei. Kelik - Siduk

N CARA LONG SEGMENT

RES DEVIASI (%)

PERMASALAHAN DAN USULAN TEKNIS UNTUK PENYEDIA JASA

-24.259

Diharapkan segera lakukan pengendalian tanaman dan Patching

MAP RENCANA

MAP RUTIN JALAN KM 372+345

KM 373+995

KM 375+220

KM 373+120 KM 378+445

KM 377+620

KM 374+645 KM 378+845

KM 378+620 KM 381+115

KM 380+635

KM 379+070 KM 383+190

KM 382+980 KM 385+095

KM 383+470 KM 385+740

KM 384+825

KM 385+145

KM 385+795

KM 387+520

KM 387+420

KM 387+920

KM 387+770 KM 390+620

KM 390+470

KM 388+020 KM 391+170

KM 390+970

KM 393+670

KM 391+470

KM 394+420

KM 393+270

KM 394+070 KM 396+770

KM 396+645

KM 394+480 KM 397+120

KM 397+070 KM 400+945

KM 400+845

Badan Jalan kondisi baik / Mantap

KM 397+420 KM 401+120

KM 401+070

KM 421+620

Tertimbun Tanah

AMPAI DENGAN MINGGU KE 30

MAP RUTIN JALAN KM 372+345

KM 373+995

KM 373+120 KM 378+445

KM 377+620

KM 375+220

KM 374+645 KM 378+845

KM 378+620 KM 381+115

KM 379+070 KM 383+190

KM 380+635

KM 382+980 KM 385+095

KM 384+825

KM 383+470 KM 385+740

KM 385+145 KM 387+520

KM 387+420

KM 385+795 KM 387+920

KM 387+770 KM 390+620

KM 388+020 KM 391+170

KM 390+470

KM 390+970

KM 391+470

KM 393+670

KM 393+270

KM 394+420

KM 394+070 KM 396+770

KM 396+645

KM 394+480 KM 397+120

KM 397+070

KM 397+420 KM 401+120

KM 400+945

401+120

KM 400+845

KM 401+070

KM 401+370

Badan Jalan kondisi baik / Mantap

KM 421+620

Tertimbun Tanah KM 414+000

KM 418+000

Nama Pekerjaan : Paket Kontrak/No :

PRESERVASI REKONTRUKSI JALAN DAN RUTIN JEMBATAN RUAS SEI.KELIK - SIDUK

Penyedia Jasa

PT. DAMAI CITRA MANDIRI

: Konsultan Supervis :

IK.02.04/PJN.WIL.I-KB/2018/03 PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA BULAN KE 1

NOMOR MATA PEMBAYARAN

U R A I A N

NILAI PEKERJAAN NILAI PEKERJAAN (%) ADD 1 (%)

BULAN KE 2

8-Jan-18

15-Jan-18

22-Jan-18

29-Jan-18

5-Feb-18

12-Feb-18

19-Feb-18

14-Jan-18

21-Jan-18

28-Jan-18

4-Feb-18

11-Feb-18

18-Feb-18

25-Feb-18

MINGGU KE

DIVISI 1 1.2

MINGGU KE

1

2

3

4

5

6

7

UMUM Mobilisasi

0.81

0.81

0.10

0.10

0.10

0.10

0.10

0.10

0.10

Manajemen dan Keselamatan Lalu Lintas

0.22

0.22

0.01

0.01

0.01

0.01

0.01

0.01

0.01

1.17

Pengamanan Lingkungan Hidup

0.20

0.20

0.01

0.01

0.01

0.01

0.01

0.01

0.01

1.21

Manajemen Mutu

0.19

0.19

0.01

0.01

0.01

0.01

0.01

0.01

0.01

1.8(1)

DIVISI 2

DRAINASE

2.1 (1)

Galian untuk Selokan Drainase dan Saluran Air

1.00

0.38

2.2.(1)

Pasangan Batu dengan Mortar

5.35

0.19

2.3.4 DIVISI 3

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm

0.30

PEKERJAAN TANAH

3.1.(1a)

Galian Biasa

1.48

4.39

0.25

0.25

0.25

3.1.(1b)

Galian Batu Lunak

0.39

0.98

0.06

0.06

0.06

3.2.(1a)

Timbunan Biasa dari Sumber Galian

0.32

1.17

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

3.34

9.79

Penyiapan Badan Jalan ( L = 7 m )

0.15

0.17

3,3.(1)

DIVISI 4 4.2.2b 4.2.6 DIVISI 5

PELEBARAN PERKERASAN DAN BAHU JALAN Lapis Pondasi Agregat Kelas S

2.45

3.49

Bahan Aspal untuk Pekerjaan Pelaburan

1.07

0.86

PERKERASAN BERBUTIR

5.5.(1a)

Lapis CTB

1.13

5.5.(1b)

Semen Untuk CTB

0.30

SKH 5.6.(1a)

Semen Untuk CTRB

11.21

9.89

SKH 5.6.(1b)

Lapis Cement Treated Base Recycler Base ( CTRB )

28.21

22.12

DIVISI 6

PERKERASAN ASPAL

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

2.15

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

0.34

2.69

-

6.3 (3a)

Lataston Lapis Aus ( HRS - WC ) ( gradasi senjang / semi senjan

14.19

16.39

6.3 (4a)

Lataston Lapis Pondasi ( HRS - Base ) ( gradasi senjang / semi

18.21

21.38

6.3 (8)

Bahan Anti Pengelupasan

-

-

DIVISI 7

STRUKTUR

7.1 (7).a

Beton mutu sedang dengan fc’= 20 MPa

0.06

7.1 (10)

Beton mutu rendah dengan fc’= 10 Mpa

0.00

-

7.3 (1)

Baja Tulangan U24 polos

0.02

-

7.3 (3)

Baja Tulangan U32 Ulir

0.10

0.05

Pasangan Batu

1.50

0.08

7.10 (2)

Pasangan Batu Kosong

0.05

7.13.(1)

Sandaran (Railing)

0.00

0.00

Marka Jalan Termoplastik

1.22

1.37

8.4.(3a)

Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade

0.08

0.08

8.4.(6a)

Patok Kilometer

0.01

0.01

8.4.(6b)

Patok Hektometer / ROW

0.07

0.07

7.9

DIVISI 8 8.4 (1)

0.02

-

PENGEMBALIAN KONDISI DAN PEK. MINOR

SKh-1.10a

PEMELIHARAAN KINERJA JALAN

SKh.1.10.a ( 5 )

Lapis Pondasi Agregat Kelas B

4.83

SKh.1.10.a ( 6 )

Lapis Pondasi Agregat Kelas S

0.03

SKh.1.10.a ( 10 )

Campuran Aspal Panas

0.08

SKh.1.10.a ( 11 )

Campuran Aspal Dingin

0.04

SKh.1.10.a ( 12 )

Penetrasi Macadam

SKh.1.10.a ( 17 ) SKh.1.10.a ( 18 ) SKh-1.10b

0.61

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

-

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.04

-

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Bahan Penutup ( sealent )

0.01

-

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Pengendalian tanaman pada Rumija

0.27

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.07

0.27

REALISA

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 )

Pembersihan Jembatan

0.15

0.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

SKh.1.10.a ( 3 )

Pengecatan Sederhana

0.15

0.15

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Perbaikan sandaran

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

100.00

100.00

SKh.1.10.b ( 10 )

JUMLAH NILAI PEKERJAAN RENCANA REALISASI

RENCANA ADD 1

REALISASI ADD 1

KEMAJUAN PEKERJAAN MINGGUAN ( % )

0.24

0.24

0.24

0.24

0.55

0.55

0.55

KEMAJUAN PEKERJAAN KUMULATIF ( % )

0.24

0.48

0.71

0.95

1.50

2.05

2.60

KEMAJUAN PEKERJAAN MINGGUAN ( % )

0.00

0.16

0.03

0.02

0.12

0.03

0.00

KEMAJUAN PEKERJAAN KUMULATIF ( % )

0.00

0.16

0.19

0.21

0.33

0.36

0.36

KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % ) KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % )

(PPK-7) NANGA TAYAP - SEI. KELIK - KETAPANG

TITO PURNOMO R, ST, MT NIP. 1968112 199703 1 003

JADWAL PELAKSANAAN Add 1

BULAN KE 2

BULAN KE 3

BULAN KE 4

BULAN KE 5

26-Feb-18

5-Mar-18

12-Mar-18

19-Mar-18

26-Mar-18

2-Apr-18

9-Apr-18

16-Apr-18

23-Apr-18

30-Apr-18

7-May-18

4-Mar-18

11-Mar-18

18-Mar-18

25-Mar-18

1-Apr-18

8-Apr-18

15-Apr-18

22-Apr-18

29-Apr-18

6-May-18

13-May-18

MINGGU KE

MINGGU KE 8

9

10

11

MINGGU KE 12

13

0.10

14

15

MINGGU KE 16

17

18

0.24

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.10

0.10

0.10

0.10

0.10

0.09

0.45

0.45

0.45

0.45

0.45

0.19 0.30

0.25

0.25

0.25

0.32

0.06

0.06

0.06

0.66

0.08

0.08

0.08

0.08 0.67

0.32

0.32

0.32

0.32

0.39

0.72

0.72

0.61

0.61

0.01

0.01

0.01

0.01

0.01

0.85 0.67

2.36

0.32

0.02

1.58

1.58

1.58

1.58

SCHEDULE AWAL

0.10

0.10

0.10

0.10

0.10

0.10

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.01

0.01

0.01

0.01

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

REALISASI

0.55

1.07

1.07

0.76

1.43

1.35

3.15

4.22

5.29

6.06

7.49

8.84

0.97

0.14

0.55

0.20

0.52

0.40

1.331

1.47

2.02

2.22

2.74

3.14 5.13

1.39

1.39

4.13

4.13

10.19

11.58

12.96

17.09

21.22

0.40

0.03

0.03

0.07

0.98

3.54

3.57

3.61

3.67

4.65

AKSANAAN PEKERJAAN

AN KE 5

BULAN KE 6

BULAN KE 7

BULAN KE 8

BULAN KE 9

14-May-18

21-May-18

28-May-18

4-Jun-18

11-Jun-18

18-Jun-18

25-Jun-18

2-Jul-18

9-Jul-18

16-Jul-18

23-Jul-18

30-Jul-18

6-Aug-18

13-Aug-18

20-Aug-18

27-Aug-18

3-Sep-18

10-Sep-18

17-Sep-18

20-May-18

27-May-18

3-Jun-18

10-Jun-18

17-Jun-18

24-Jun-18

1-Jul-18

8-Jul-18

15-Jul-18

22-Jul-18

29-Jul-18

5-Aug-18

12-Aug-18

19-Aug-18

26-Aug-18

2-Sep-18

9-Sep-18

16-Sep-18

23-Sep-18

GGU KE 19

MINGGU KE 20

21

22

MINGGU KE

23

24

25

26

27

MINGGU KE 28

29

30

31

MINGGU KE 32

33

34

35

36

37

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.01

0.32

0.32

0.32

0.32

0.32

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

L 0.21

0.21

0.21

0.21

0.01

0.01

0.01

0.01

I B

0.21 0.01

SCHEDULE ADD 1

B U

0.87

0.87

0.87

0.87

0.17

0.17

0.17

0.17

R 0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.08

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.02

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

0.48

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

1.16

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

0.19

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.17

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

1.53

I D U L

ULE AWAL

0.05 0.02

0.02

0.02

0.18

0.18

0.18

F I T R I

I 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

2.30

2.30

2.30

2.30

0.00

0.00

5.19

4.86

4.86

4.86

4.86

4.86

4.86

4.86

4.86

5.91

4.36

4.36

4.42

23.52

25.82

28.11

30.41

30.41

30.41

35.60

40.46

45.33

50.19

55.06

59.92

64.79

69.65

74.51

80.42

84.79

89.15

93.57

0.82

0.11

2.25

-0.03

0.00

0.00

0.00

2.51

0.00

0.00

0.00

0.00

5.47

5.58

7.84

7.81

7.81

7.81

7.81

10.32

10.32

10.32

10.32

10.32

PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA

Ir. TOTOK KUSMANTO Site Engineer

BULAN KE 10

BULAN KE 11

BULAN KE 12

BULAN KE 13

24-Sep-18

1-Oct-18

8-Oct-18

15-Oct-18

22-Oct-18

29-Oct-18

5-Nov-18

12-Nov-18

19-Nov-18

26-Nov-18

3-Dec-18

10-Dec-18

17-Dec-18

24-Dec-18

30-Sep-18

7-Oct-18

14-Oct-18

21-Oct-18

28-Oct-18

4-Nov-18

11-Nov-18

18-Nov-18

25-Nov-18

2-Dec-18

9-Dec-18

16-Dec-18

23-Dec-18

31-Dec-18

MINGGU KE 38

39

0.01

0.01

0.01

0.01

0.01

0.01

0.21

0.21

MINGGU KE 40

0.21

41

0.21

42

0.21

MINGGU KE

43

0.21

44

0.21

45

0.21

46

0.21

47

0.21

MINGGU KE 48

0.21

49

0.21

50

0.21

51

0.17

0.19 1.17 1.53

0.02

0.02 0.00

0.18

0.18 0.08

0.01

0.01

0.03

0.03

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

3.55

0.53

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.21

0.00

97.12

97.66

97.87

98.08

98.30

98.51

98.72

98.94

99.15

99.36

99.58

99.79

100.00

100.00

PT. DAMAI CITRA MANDIRI

KOES WIDARYANTO General Superintendent

Nama Pekerjaan Paket Kontrak/No Penyedia Jasa Konsultan Supervisi

: : : :

PRESERVASI REKONTRUKSI JALAN DAN RUTIN JEMBATAN RUAS SEI.KELIK - SIDUK IK.02.04/PJN.WIL.I-KB/2018/03 PT. DAMAI CITRA MANDIRI PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA BULAN KE 1

NOMOR MATA PEMBAYARAN

U R A I A N

NILAI PEKERJAAN (%)

NILAI PEKERJAAN ADD 1 (%)

8-Jan-18 14-Jan-18

UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Pengamanan Lingkungan Hidup Manajemen Mutu

DIVISI 2 2.1 (1) 2.2.(1) 2.3.4

DRAINASE Galian untuk Selokan Drainase dan Saluran Air Pasangan Batu dengan Mortar Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 cm

DIVISI 3 3.1.(1a) 3.1.(1b) 3.2.(1a) 3.2.(2a) 3,3.(1) DIVISI 4 4.2.2b 4.2.6 DIVISI 5 5.5.(1a) 5.5.(1b) SKH 5.6.(1a) SKH 5.6.(1b)

0.87 0.24 0.21 0.20

0.87 0.24 0.21 0.20

1.07 5.73

0.41 0.21 0.32

PEKERJAAN TANAH Galian Biasa Galian Batu Lunak Timbunan Biasa dari Sumber Galian Timbunan Pilihan dari Sumber Galian Penyiapan Badan Jalan ( L = 7 m )

1.59 0.41 0.35 3.01 0.16

4.70 1.04 1.26 5.32 0.19

PELEBARAN PERKERASAN DAN BAHU JALAN Lapis Pondasi Agregat Kelas S Bahan Aspal untuk Pekerjaan Pelaburan

2.62 1.15

3.74 0.92

12.00 30.21

1.21 0.32 10.59 23.69

PERKERASAN BERBUTIR Lapis CTB Semen Untuk CTB Semen Untuk CTRB Lapis Cement Treated Base Recycler Base ( CTRB )

DIVISI 6 6.1 (1)(b) 6.1 (2)(b) 6.3 (3a) 6.3 (4a) 6.3 (8)

PERKERASAN ASPAL Lapis Resap Pengikat - Aspal Emulsi Lapis Perekat - Aspal Emulsi Lataston Lapis Aus ( HRS - WC ) ( gradasi senjang / semi senjang ) Lataston Lapis Pondasi ( HRS - Base ) ( gradasi senjang / semi senjang ) Bahan Anti Pengelupasan

DIVISI 7

STRUKTUR

2.30 0.37 15.20 19.50 -

2.88 17.55 22.89

22-Jan-18 28-Jan-18

29-Jan-18 4-Feb-18

5-Feb-18 11-Feb-18

MINGGU KE 1

DIVISI 1 1.2 1.8(1) 1.17 1.21

15-Jan-18 21-Jan-18

BULAN KE 2

0.11 0.01 0.01 0.01

2

0.11 0.01 0.01 0.01

3

0.11 0.01 0.01 0.01

12-Feb-18 18-Feb-18

19-Feb-18 25-Feb-18

MINGGU KE 4

0.11 0.01 0.01 0.01

5

6

7

0.11 0.01 0.01 0.01

0.11 0.01 0.01 0.01

0.11 0.01 0.01 0.01

0.26 0.07

0.26 0.07

0.26 0.07

7.1 (7).a 7.1 (10) 7.3 (1) 7.3 (3) 7.9 7.10 (2) 7.13.(1)

Beton mutu sedang dengan fc’= 20 MPa Beton mutu rendah dengan fc’= 10 Mpa Baja Tulangan U24 polos Baja Tulangan U32 Ulir Pasangan Batu Pasangan Batu Kosong Sandaran (Railing)

DIVISI 8 8.4 (1) 8.4.(3a) 8.4.(6a) 8.4.(6b)

PENGEMBALIAN KONDISI DAN PEK. MINOR Marka Jalan Termoplastik Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade Patok Kilometer Patok Hektometer / ROW

JUMLAH NILAI PEKERJAAN RENCANA REALISASI RENCANA ADD 1 REALISASI ADD 1

0.06 0.01 0.02 0.11 1.61 0.05 0.00

0.02 0.06 0.09 0.00

0.78 0.09 0.01 0.07

0.90 0.09 0.01 0.07

100.00

100.00

KEMAJUAN PEKERJAAN MINGGUAN ( % )

0.13

0.13

0.13

0.13

0.46

0.46

0.46

KEMAJUAN PEKERJAAN KUMULATIF ( % )

0.13

0.25

0.38

0.51

0.97

1.43

1.89

KEMAJUAN PEKERJAAN MINGGUAN ( % )

0.00

0.00

0.00

0.00

0.35

0.52

0.12

KEMAJUAN PEKERJAAN KUMULATIF ( % )

0.00

0.00

0.00

0.00

0.35

0.87

1.00

0.00

-0.25

-0.38

-0.51

-0.62

-0.55

-0.89

KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % ) KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % )

DEVIASI

(PPK-7) NANGA TAYAP - SEI. KELIK - KETAPANG

TITO PURNOMO R, ST, MT NIP. 1968112 199703 1 003

JADWAL PELAKSANAAN PEKERJAAN MONITORING ONLY Add 1

BULAN KE 2

BULAN KE 3

26-Feb-18 4-Mar-18

5-Mar-18 11-Mar-18

MINGGU KE

12-Mar-18 18-Mar-18

19-Mar-18 25-Mar-18

BULAN KE 4

26-Mar-18 1-Apr-18

2-Apr-18 8-Apr-18

MINGGU KE 8

9

0.11 0.01 0.01 0.01

0.26 0.07

10

11

9-Apr-18 15-Apr-18 MINGGU KE

12

13

14

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.26 0.01 0.01 0.01

0.11 0.48

0.11 0.48

0.11 0.48

0.11 0.48

0.11 0.48

0.09 0.21

0.26 0.07 0.09

0.26 0.07 0.09

0.09

0.09 0.60

0.60

0.34 0.71 0.91 0.53 0.01

2.52

REALISASI

0.46

1.02

1.02

0.69

1.29

1.20

2.35

3.37

4.39

5.08

6.37

7.58

0.22

0.00

0.06

0.00

0.49

0.40

1.22

1.22

1.28

1.28

1.76

2.16 5.60 8.78 0.43 2.59

-1.13

-2.15

-3.12

-3.81

-4.61

-5.42

-6.20

PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA

NAAN PEKERJAAN

NG ONLY

AN KE 4

BULAN KE 5

16-Apr-18 22-Apr-18

23-Apr-18 29-Apr-18

30-Apr-18 6-May-18

GGU KE

7-May-18 13-May-18

BULAN KE 6

14-May-18 20-May-18

21-May-18 27-May-18

28-May-18 3-Jun-18

MINGGU KE

15

16

0.01 0.01 0.01

0.01 0.01 0.01

17

0.01 0.01 0.01

18

0.01 0.01 0.01

4-Jun-18 10-Jun-18

BULAN KE 7

11-Jun-18 17-Jun-18

18-Jun-18 24-Jun-18

25-Jun-18 1-Jul-18

MINGGU KE

19

0.01 0.01 0.01

20

0.01 0.01 0.01

21

0.01 0.01 0.01

22

2-Jul-18 8-Jul-18

9-Jul-18 15-Jul-18

BULAN KE 8

16-Jul-18 22-Jul-18

23-Jul-18 29-Jul-18

MINGGU KE

23

24

0.01 0.01 0.01

25

0.01 0.01 0.01

26

0.01 0.01 0.01

27

0.01 0.01 0.01

30-Jul-18 5-Aug-18

6-Aug-18 12-Aug-18

13-Aug-18 19-Aug-18

20-Aug-18 26-Aug-18

MINGGU KE 28

29

0.01 0.01 0.01

0.01 0.01 0.01

30

0.01 0.01 0.01

31

32

33

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

L I

0.32

SCHEDULE ADD 1

B 0.34

0.34

0.34

0.34

0.34

0.34

0.34

0.34

0.53 0.01

0.53 0.01

0.53 0.01

0.53 0.01

0.53 0.01

0.53 0.01

0.53 0.01

0.53 0.01

U R

0.34

0.53 0.01

I

0.34

0.02

1.70 1.70

1.70 1.70

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

D U

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.09 0.02 0.51 1.24

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

L

SCHEDULE AWAL

F I

L

SCHEDULE AWAL

F I T R I

SI

1.24

1.24

4.29

4.29

2.77

2.77

2.77

2.77

0.00

0.00

5.86

4.98

4.98

4.98

4.98

4.98

4.98

4.98

4.98

10.03

11.27

15.57

19.86

22.63

25.39

28.16

30.93

30.93

30.93

36.79

41.77

46.75

51.74

56.72

61.70

66.68

71.66

76.64

0.14

0.09

0.08

1.21

1.02

0.28

0.52

0.00

0.00

0.00

0.00

3.83

0.00

0.00

0.00

0.00

2.73

2.82

2.90

4.11

5.12

5.40

5.92

5.92

5.92

5.92

5.92

9.75

9.75

9.75

9.75

9.75

-7.30

-8.45

-12.67

-15.75

-17.50

-19.99

-22.24

-25.01

-25.01

-25.01

-30.87

-32.02

-37.00

-41.99

-46.97

-51.95

YA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA

Ir. TOTOK KUSMANTO Site Engineer

BULAN KE 9

27-Aug-18 2-Sep-18

BULAN KE 10

3-Sep-18 9-Sep-18

10-Sep-18 16-Sep-18

17-Sep-18 23-Sep-18

MINGGU KE 34

35

24-Sep-18 30-Sep-18

MINGGU KE 36

37

38

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.01 0.01 0.01

0.94 0.18

0.94 0.18

0.94 0.18

0.94 0.18

0.18

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.21 1.25 1.64

0.09 0.02 0.51 1.24

0.21 1.25 1.64

1-Oct-18 5-Oct-18 39

0.01 0.01 0.01

0.02

0.02

0.02

0.06 0.02

0.02 0.00

0.18

0.18

0.18

0.18 0.01 0.04

0.18 0.09 0.01 0.04

6.10

4.44

4.44

4.49

3.57

0.33

82.74

87.17

91.61

96.10

99.67

100.00

PT. DAMAI CITRA MANDIRI

KOES WIDARYANTO General Superintendent

Nama Pekerjaan Paket Kontrak/No Penyedia Jasa Konsultan Supervisi

: : : :

PRESERVASI REKONTRUKSI JALAN DAN RUTIN JEMBATAN RUAS SEI.KELIK - SIDUK IK.02.04/PJN.WIL.I-KB/2018/03 PT. DAMAI CITRA MANDIRI PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN PT. WIRAWIDYATAMA BULAN KE 1

NOMOR MATA PEMBAYARAN

U R A I A N

NILAI PEKERJAAN (%)

NILAI PEKERJAAN ADD 1 (%)

8-Jan-18 14-Jan-18

1.17 1.21

UMUM Mobilisasi Manajemen dan Keselamatan Lalu Lintas Pengamanan Lingkungan Hidup Manajemen Mutu

-

-

-

-

DIVISI 2 2.1 (1) 2.2.(1)

DRAINASE Galian untuk Selokan Drainase dan Saluran Air Pasangan Batu dengan Mortar

-

-

DIVISI 3 3.1.(1a) 3.1.(1b) 3.2.(1a) 3.2.(2a) 3,3.(1)

PEKERJAAN TANAH Galian Biasa Galian Batu Lunak Timbunan Biasa dari Sumber Galian Timbunan Pilihan dari Sumber Galian Penyiapan Badan Jalan ( L = 7 m )

-

-

DIVISI 4 4.2.2b 4.2.6

PELEBARAN PERKERASAN DAN BAHU JALAN Lapis Pondasi Agregat Kelas S Bahan Aspal untuk Pekerjaan Pelaburan

-

-

PERKERASAN BERBUTIR Semen Untuk CTRB Lapis Cement Treated Base Recycler Base ( CTRB )

-

-

DIVISI 5 SKH 5.6.(1a) SKH 5.6.(1b) DIVISI 6 6.1 (1)(b) 6.1 (2)(b) 6.3 (3a) 6.3 (4a) 6.3 (8)

PERKERASAN ASPAL Lapis Resap Pengikat - Aspal Emulsi Lapis Perekat - Aspal Emulsi Lataston Lapis Aus ( HRS - WC ) ( gradasi senjang / semi senjang ) Lataston Lapis Pondasi ( HRS - Base ) ( gradasi senjang / semi senjang ) Bahan Anti Pengelupasan

-

-

DIVISI 7 7.1 (7).a 7.1 (10) 7.3 (1)

STRUKTUR Beton mutu sedang dengan fc’= 20 MPa Beton mutu rendah dengan fc’= 10 Mpa Baja Tulangan U24 polos

-

-

22-Jan-18 28-Jan-18

29-Jan-18 4-Feb-18

5-Feb-18 11-Feb-18

MINGGU KE 1

DIVISI 1 1.2 1.8(1)

15-Jan-18 21-Jan-18

BULAN KE 2

2

3

12-Feb-18 18-Feb-18

19-Feb-18 25-Feb-18

MINGGU KE 4

5

6

7

7.3 (3) 7.9 7.10 (2) 7.13.(1)

Baja Tulangan U32 Ulir Pasangan Batu Pasangan Batu Kosong Sandaran (Railing)

DIVISI 8 8.4 (1) 8.4.(3a) 8.4.(6a) 8.4.(6b) SKh-1.10a SKh.1.10.a ( 5 ) SKh.1.10.a ( 6 ) SKh.1.10.a ( 10 ) SKh.1.10.a ( 11 ) SKh.1.10.a ( 12 ) SKh.1.10.a ( 17 ) SKh.1.10.a ( 18 ) SKh-1.10b

-

-

PENGEMBALIAN KONDISI DAN PEK. MINOR Marka Jalan Termoplastik Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade Patok Kilometer Patok Hektometer / ROW

-

-

PEMELIHARAAN KINERJA JALAN Lapis Pondasi Agregat Kelas B Lapis Pondasi Agregat Kelas S Campuran Aspal Panas Campuran Aspal Dingin Penetrasi Macadam Bahan Penutup ( sealent ) Pengendalian tanaman pada Rumija

-

-

Pembersihan Jembatan Pengecatan Sederhana Perbaikan sandaran

48.42 48.35 3.22

100.00

JUMLAH NILAI PEKERJAAN

REALISASI RENCANA ADD 1 REALISASI ADD 1

REALISASI

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 ) SKh.1.10.a ( 3 ) SKh.1.10.b ( 10 )

RENCANA

SCHEDULE AWA

48.42 48.35 3.22

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

100.00

KEMAJUAN PEKERJAAN MINGGUAN ( % )

2.13

2.13

2.13

2.13

2.13

2.13

2.13

KEMAJUAN PEKERJAAN KUMULATIF ( % )

2.13

4.26

6.38

8.51

10.64

12.77

14.89

KEMAJUAN PEKERJAAN MINGGUAN ( % )

0.00

0.00

0.00

0.00

0.00

0.00

11.61

KEMAJUAN PEKERJAAN KUMULATIF ( % )

0.00

0.00

0.00

0.00

0.00

0.00

11.61

0.00

-4.26

-6.38

-8.51

-10.64

-12.77

-3.28

KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % ) KEMAJUAN PEKERJAAN MINGGUAN ( % ) KEMAJUAN PEKERJAAN KUMULATIF ( % )

DEVIASI

(PPK-7) NANGA TAYAP - SEI. KELIK - KETAPANG

TITO PURNOMO R, ST, MT NIP. 1968112 199703 1 003

JADWAL PELAKSANAAN PEKERJAAN RUTIN JE MONITORING ONLY Add 1

BULAN KE 2

BULAN KE 3

26-Feb-18 4-Mar-18

5-Mar-18 11-Mar-18

MINGGU KE

12-Mar-18 18-Mar-18

19-Mar-18 25-Mar-18

BULAN KE 4

26-Mar-18 1-Apr-18

2-Apr-18 8-Apr-18

MINGGU KE 8

9

10

11

9-Apr-18 15-Apr-18

16-Apr-18 22-Apr-18

BULAN KE 5

23-Apr-18 29-Apr-18

30-Apr-18 6-May-18

MINGGU KE 12

13

14

15

7-May-18 13-May-18

14-May-18 20-May-18

BULAN KE 6

21-May-18 27-May-18

28-May-18 3-Jun-18

MINGGU KE 16

17

18

19

4-Jun-18 10-Jun-18

11-Jun-18 17-Jun-18

MINGGU KE 20

21

22

23

L I B U R

I

SCHEDULE ADD 1

D U L

L

F

SCHEDULE AWAL

I T R I 1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

2.13

2.13

2.13

2.13

2.13

2.13

17.02

19.15

21.28

23.40

25.53

27.66

2.79

0.00

0.00

9.06

0.61

1.57

14.40

14.40

14.40

23.47

24.07

25.64

-2.62

-4.75

-6.87

0.06

-1.46

-2.02

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

1.03 1.03 0.07

2.13

2.13

2.13

2.13

2.13

2.13

2.13

2.13

2.13

0.00

29.79

31.91

34.04

36.17

38.30

40.43

42.55

44.68

46.81

46.81

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.64

25.64

25.64

25.64

25.64

25.64

25.64

25.64

25.64

25.64

-4.15

-6.27

-8.40

-10.53

-12.66

-14.78

-16.91

-19.04

-21.17

-21.17

PT. ADIYA WIDYAJASA JO PT. SAICLE JASA DAN WIRAWIDYATAMA

Ir. TOTOK KUSMANTO Site Engineer

RUTIN JEMBATAN

6

BULAN KE 7

18-Jun-18 24-Jun-18

25-Jun-18 1-Jul-18

KE

2-Jul-18 8-Jul-18

9-Jul-18 15-Jul-18

BULAN KE 8

16-Jul-18 22-Jul-18

23-Jul-18 29-Jul-18

MINGGU KE 24

L I B U R

I D U L

25

26

27

30-Jul-18 5-Aug-18

6-Aug-18 12-Aug-18

BULAN KE 9

13-Aug-18 19-Aug-18

20-Aug-18 26-Aug-18

MINGGU KE 28

29

30

31

27-Aug-18 2-Sep-18

3-Sep-18 9-Sep-18

BULAN KE 10

10-Sep-18 16-Sep-18

17-Sep-18 23-Sep-18

MINGGU KE 32

33

34

35

24-Sep-18 30-Sep-18

1-Oct-18 7-Oct-18

B

8-Oct-18 14-Oct-18

15-Oct-18 21-Oct-18

MINGGU KE 36

37

38

39

M 40

41

L

F I T R I 0.95 0.95 0.06

ngineer

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.00

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

46.81

48.78

50.75

52.72

54.69

56.66

58.63

60.60

62.57

64.54

66.51

68.48

70.45

72.42

74.39

76.36

78.33

80.30

0.00

0.00

0.00

0.00

0.00

0.00

0.00

25.64

25.64

25.64

25.64

25.64

25.64

25.64

-21.17

-23.14

-25.11

-27.08

-29.05

-31.02

-32.99

O PT. SAICLE JASA DAN PT. IDYATAMA

KUSMANTO

0.95 0.95 0.06

BULAN KE 11

22-Oct-18 28-Oct-18

29-Oct-18 4-Nov-18

BULAN KE 12

5-Nov-18 11-Nov-18

12-Nov-18 18-Nov-18

MINGGU KE 42

43

19-Nov-18 25-Nov-18

26-Nov-18 2-Dec-18

BULAN KE 13

3-Dec-18 9-Dec-18

10-Dec-18 16-Dec-18

MINGGU KE 44

45

46

47

17-Dec-18 23-Dec-18

24-Dec-18 31-Dec-18

MINGGU KE 48

49

50

51

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

0.95 0.95 0.06

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

1.97

82.27

84.24

86.21

88.18

90.15

92.12

94.09

96.06

98.03

100.00

PT. DAMAI CITRA MANDIRI

KOES WIDARYANTO General Superintendent

LAPORAN MINGGUAN ( UMUM / GABUNGAN PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN

MINGGU LALU VOLUME

BOBOT

(%) DIVISI 1 1.2

(%)

UMUM Mobilisasi

Ls

1.00

0.815

0.58

0.476

Manajemen dan Keselamatan Lalu Lintas

LS

1.00

0.221

0.31

0.070

1.17

Pengamanan Lingkungan Hidup

LS

1.00

0.199

0.32

0.063

1.21

Manajemen Mutu

LS

1.00

0.188

0.31

0.059

2,141.86

0.137

1.8(1)

DIVISI 2

DRAINASE

2.1 (1)

Galian untuk Selokan Drainase dan Saluran Air

M3

6,384.37

0.408

2.2.(1)

Pasangan Batu dengan Mortar

M3

287.80

0.512

-

-

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 c

M1

44.00

0.303

-

-

2.3.4 DIVISI 3

PEKERJAAN TANAH

3.1.(1a)

Galian Biasa

M3

22,275.00

1.630

22,275.00

1.630

3.1.(1a)a

Galian Biasa

M3

37,688.66

2.687

7,210.20

0.514

3.1.(1b)

Galian Batu Lunak

M3

1,567.50

0.424

603.40

0.163

3.1.(1b)a

Galian Batu Lunak

M3

2,041.84

0.552

3.2.(1a)

Timbunan Biasa dari Sumber Galian

M3

1,393.70

0.301

3.2.(1a)a

Timbunan Biasa dari Sumber Galian

M3

3,192.52

0.690

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M3

10,307.55

3.679

3.2.(2a)a

Timbunan Pilihan dari Sumber Galian

M3

17,135.03

6.108

480.00 3,883.73 -

0.104 1.386 -

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%) 3,3.(1) DIVISI 4

Penyiapan Badan Jalan ( L = 7 m )

(%)

M2

26,100.00

0.094

26,100.00

0.094

PELEBARAN PERKERASAN DAN BAHU JALAN

4.2.2b

Lapis Pondasi Agregat Kelas S

M3

2,079.00

2.692

-

-

4.2.2ba

Lapis Pondasi Agregat Kelas S

M3

621.00

0.789

-

-

21,600.00

0.860

-

-

4.2.6

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

DIVISI 5

PERKERASAN BERBUTIR

5.5.(1a)

Lapis CTB

M3

602.25

1.127

-

-

5.5.(1b)

Semen Untuk CTB

Ton

81.62

0.299

-

-

SKH 5.6.(1a)

Semen Untuk CTRB

Ton

2,700.49

9.892

567.00

2.077

SKH 5.6.(1b)

Lapis Cement Treated Base Recycler Base ( CTRB )

M3

19,053.02

22.130

2,372.27

2.755

DIVISI 6

PERKERASAN ASPAL

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

Liter

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

Liter

8,910.00

6.1 (2)(b)a

Lapis Perekat - Aspal Emulsi

Liter

6.2 (1)

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

6.2 (1)a

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

-

-

-

-

0.377

-

-

54,810.00

2.291

-

-

Ton

4,098.60

15.620

-

-

Ton

203.41

0.770

-

-

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%)

(%)

6.3(5a)

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

5,464.80

20.040

-

-

6.3(5a)a

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

367.18

1.339

-

-

DIVISI 7

STRUKTUR

7.1 (7).a

Beton mutu sedang dengan fc’= 20 MPa

M3

4.32

0.019

-

-

7.1 (10)

Beton mutu rendah dengan fc’= 10 Mpa

M3

-

-

-

-

7.3 (1)

Baja Tulangan U24 polos

Kg

-

-

-

-

7.3 (3)

Baja Tulangan U32 Ulir

Kg

1,131.30

0.053

-

-

Pasangan Batu

M3

46.35

0.082

-

-

7.10 (2)

Pasangan Batu Kosong

M3

-

-

-

7.13.(1)

Sandaran (Railing)

M1

4.00

0.003

-

-

7.9

DIVISI 8

-

PENGEMBALIAN KONDISI DAN PEK. MINOR

8.4 (1)

Marka Jalan Termoplastik

M2

4,950.00

1.339

8.4.(1) a

Marka Jalan Termoplastik

M2

132.57

0.036

-

-

8.4.(3a)

Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade

Buah

48.00

0.083

-

-

8.4.(6a)

Patok Kilometer

Buah

9.00

0.011

-

-

8.4.(6b)

Patok Hektometer / ROW

Buah

81.00

0.070

-

-

378.11

0.615

-

-

-

-

SKh-1.10a

1,970.62

0.533

PEMELIHARAAN KINERJA JALAN

SKh.1.10.a ( 5 )

Lapis Pondasi Agregat Kelas B

M3

SKh.1.10.a ( 6 )

Lapis Pondasi Agregat Kelas S

M3

-

-

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%) SKh.1.10.a ( 10 )

Campuran Aspal Panas

M3

8.45

SKh.1.10.a ( 11 )

Campuran Aspal Dingin

M3

-

SKh.1.10.a ( 12 )

Penetrasi Macadam

M3

SKh.1.10.a ( 17 )

Bahan Penutup ( sealent )

SKh.1.10.a ( 18 )

Pengendalian tanaman pada Rumija

SKh-1.10b

(%)

0.074

-

-

-

-

-

-

-

-

-

Kg

-

-

-

-

Ls

1.00

0.270

0.67

0.180

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 )

Pembersihan Jembatan

M2

24,034.62

0.148

11,647.35

0.072

SKh.1.10.a ( 3 )

Pengecatan Sederhana

M2

400.00

0.148

18.00

0.007

Perbaikan sandaran

M'

20.00

0.010

SKh.1.10.b ( 10 )

JUMLAH

100.00

-

10.320

Disetujui Oleh KOORDINATOR LAPANGAN

Diperiksa Oleh Konsultan Supervisi PT. ADIYA WIDYAJASA

( …………………………………………………… )

Ir. TOTOK KUSMANTO Site Engineer

N ( UMUM / GABUNGAN ) KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

-

0.58

0.476

-

-

0.31

0.070

-

-

0.32

0.063

-

-

0.31

0.059

-

-

2,141.86

0.137

-

-

-

-

-

-

-

-

-

-

22,275.00

1.630

-

-

7,210.20

0.514

-

-

603.40

0.163

-

-

-

-

-

-

-

-

-

480.00 3,883.73 -

0.104 1.386 -

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

-

26,100.00

0.094

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

567.00

2.077

-

-

2,372.27

2.755

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1,970.62

0.533

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

0.67

0.180

-

-

11,647.35

0.072

-

-

18.00

0.007

-

-

-

-

-

10.320

RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : :

59.921 ( % ) 10.320 ( % ) (49.601) ( % )

DIBUAT OLEH KONTRAKTOR PT. DAMAI CITRA MANDIRI

KOES WIDARYANTO, ST General Superintendent

LAPORAN MINGGUAN ( REKONSTRUKSI JALA PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN

MINGGU LALU VOLUME

BOBOT

(%) DIVISI 1 1.2

(%)

UMUM Mobilisasi

Ls

1.00

0.87

0.70

0.61

Manajemen dan Keselamatan Lalu Lintas

LS

1.00

0.24

0.31

0.07

1.17

Pengamanan Lingkungan Hidup

LS

1.00

0.21

0.32

0.07

1.21

Manajemen Mutu

LS

1.00

0.20

0.31

0.06

2,141.86

0.15

1.8(1)

DIVISI 2

DRAINASE

2.1 (1)

Galian untuk Selokan Drainase dan Saluran Air

M3

6,384.37

0.44

2.2.(1)

Pasangan Batu dengan Mortar

M3

287.80

0.55

-

-

Gorong-gorong Pipa Beton Bertulang, diameter dalam 95 - 105 c

M1

44.00

0.32

-

-

2.3.4 DIVISI 3

PEKERJAAN TANAH

3.1.(1a)

Galian Biasa

M3

22,275.00

1.74

22,275.00

1.74

3.1.(1a)a

Galian Biasa

M3

37,688.66

2.94

7,210.20

0.56

3.1.(1b)

Galian Batu Lunak

M3

1,567.50

0.45

603.40

0.17

3.1.(1b)a

Galian Batu Lunak

M3

2,041.84

0.59

3.2.(1a)

Timbunan Biasa dari Sumber Galian

M3

1,393.70

0.38

3.2.(1a)a

Timbunan Biasa dari Sumber Galian

M3

3,192.52

0.87

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M3

8,662.50

3.30

3.2.(2a)a

Timbunan Pilihan dari Sumber Galian

M3

5,265.00

2.01

727.52 2,238.68 -

0.20 0.85 -

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%) 3,3.(1) DIVISI 4

Penyiapan Badan Jalan ( L = 7 m )

(%)

M2

26,100.00

0.10

26,100.00

0.10

PELEBARAN PERKERASAN DAN BAHU JALAN

4.2.2b

Lapis Pondasi Agregat Kelas S

M3

2,079.00

2.87

-

-

4.2.2ba

Lapis Pondasi Agregat Kelas S

M3

621.00

0.86

-

-

21,600.00

0.92

-

-

4.2.6

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

DIVISI 5

PERKERASAN BERBUTIR

5.5.(1a)

Lapis CTB

M3

602.25

1.20

-

-

5.5.(1b)

Semen Untuk CTB

Ton

81.62

0.32

-

-

SKH 5.6.(1a)

Semen Untuk CTRB

Ton

2,700.49

10.56

567.00

2.22

SKH 5.6.(1b)

Lapis Cement Treated Base Recycler Base ( CTRB )

M3

19,053.02

23.62

2,372.27

2.94

DIVISI 6

PERKERASAN ASPAL

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

Liter

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

Liter

6.1 (2)(b)a

Lapis Perekat - Aspal Emulsi

6.2 (1) 6.2 (1)a

-

-

-

-

8,910.00

0.40

-

-

Liter

54,810.00

2.47

-

-

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

4,098.60

16.67

-

-

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

203.41

0.83

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%)

(%)

6.3(5a)

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

5,464.80

21.39

6.3(5a)a

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

367.18

1.44

DIVISI 7

STRUKTUR

7.1 (7).a

Beton mutu sedang dengan fc’= 20 MPa

M3

4.32

0.02

-

-

7.1 (10)

Beton mutu rendah dengan fc’= 10 Mpa

M3

-

-

-

-

7.3 (1)

Baja Tulangan U24 polos

Kg

-

-

-

-

7.3 (3)

Baja Tulangan U32 Ulir

Kg

1,131.30

0.06

-

-

Pasangan Batu

M3

46.35

0.09

-

-

7.10 (2)

Pasangan Batu Kosong

M3

-

-

-

-

7.13.(1)

Sandaran (Railing)

M1

4.00

0.00

-

-

7.9

DIVISI 8

PENGEMBALIAN KONDISI DAN PEK. MINOR

-

8.4 (1)

Marka Jalan Termoplastik

M2

2,970.00

0.86

-

-

8.4.(1) a

Marka Jalan Termoplastik

M2

141.96

0.04

-

-

8.4.(3a)

Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade

Buah

48.00

0.09

-

-

8.4.(6a)

Patok Kilometer

Buah

9.00

0.01

-

-

8.4.(6b)

Patok Hektometer / ROW

Buah

81.00

0.07

-

-

SKh-1.10a

PEMELIHARAAN KINERJA JALAN

SKh.1.10.a ( 5 )

Lapis Pondasi Agregat Kelas B

M3

SKh.1.10.a ( 6 )

Lapis Pondasi Agregat Kelas S

M3

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

SKh.1.10.a ( 10 )

Campuran Aspal Panas

M3

SKh.1.10.a ( 11 )

Campuran Aspal Dingin

M3

SKh.1.10.a ( 12 )

Penetrasi Macadam

M3

SKh.1.10.a ( 17 )

Bahan Penutup ( sealent )

Kg

SKh.1.10.a ( 18 )

Pengendalian tanaman pada Rumija

Ls

SKh-1.10b

VOLUME

BOBOT (%)

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 )

Pembersihan Jembatan

M2

SKh.1.10.a ( 3 )

Pengecatan Sederhana

M2

Perbaikan sandaran

M'

SKh.1.10.b ( 10 )

MINGGU LALU

JUMLAH

100.00

Disetujui Oleh KOORDINATOR LAPANGAN

Diperiksa Oleh Konsultan Supervisi PT. ADIYA WIDYAJASA

( …………………………………………………… )

Ir. TOTOK KUSMANTO Site Engineer

9.746

( REKONSTRUKSI JALAN ) KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

BOBOT

(%)

-

(%)

-

0.70

0.61

-

0.31

0.07

-

0.32

0.07

-

0.31

0.06

-

2,141.86

0.15

-

-

-

-

-

-

-

22,275.00

1.74

-

7,210.20

0.56

-

603.40

0.17

-

-

KETERANGAN

-

727.52 2,238.68 -

0.20 0.85 -

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%) -

26,100.00

0.10

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

567.00

2.22

-

2,372.27

2.94

-

-

-

-

-

-

-

-

-

-

-

-

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

9.746

RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : :

61.697 ( % ) 9.746 ( % ) (51.951) ( % )

DIBUAT OLEH KONTRAKTOR PT. DAMAI CITRA MANDIRI

KOES WIDARYANTO, ST General Superintendent

LAPORAN MINGGUAN ( RUTIN JALAN ) PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN

MINGGU LALU VOLUME

(%) DIVISI 1 1.2

LS

Manajemen dan Keselamatan Lalu Lintas

LS

1.17

Pengamanan Lingkungan Hidup

LS

1.21

Manajemen Mutu

LS

DIVISI 2

DRAINASE

2.1 (1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

DIVISI 3

(%)

UMUM Mobilisasi

1.8(1)

BOBOT

PEKERJAAN TANAH

3.1.(1a)

Galian Biasa

M3

3.1.(1a)a

Galian Biasa

M3

3.1.(1b)

Galian Batu Lunak

M3

3.1.(1b)a

Galian Batu Lunak

M3

3.2.(1a)

Timbunan Biasa dari Sumber Galian

M3

3.2.(1a)a

Timbunan Biasa dari Sumber Galian

M3

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M3

1,645.05

9.30

1,645.05

9.30

3.2.(2a)a

Timbunan Pilihan dari Sumber Galian

M3

11,870.03

67.08

2,672.95

15.10

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

3,3.(1) DIVISI 4

Penyiapan Badan Jalan ( L = 7 m )

M2

PELEBARAN PERKERASAN DAN BAHU JALAN

4.2.2b

Lapis Pondasi Agregat Kelas S

M3

4.2.2ba

Lapis Pondasi Agregat Kelas S

M3

4.2.6

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

DIVISI 5

PERKERASAN BERBUTIR

5.5.(1a)

Lapis CTB

M3

5.5.(1b)

Semen Untuk CTB

Ton

SKH 5.6.(1a)

Semen Untuk CTRB

Ton

SKH 5.6.(1b)

Lapis Cement Treated Base Recycler Base ( CTRB )

M3

DIVISI 6

PERKERASAN ASPAL

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

Liter

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

Liter

6.1 (2)(b)a

Lapis Perekat - Aspal Emulsi

Liter

MINGGU LALU VOLUME

BOBOT (%)

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN

MINGGU LALU VOLUME

(%) 6.2 (1)

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

6.2 (1)a

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

6.3(5a)

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

6.3(5a)a

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

DIVISI 7

STRUKTUR

7.1 (7).a

Beton mutu sedang dengan fc’= 20 MPa

M3

7.1 (10)

Beton mutu rendah dengan fc’= 10 Mpa

M3

7.3 (1)

Baja Tulangan U24 polos

Kg

7.3 (3)

Baja Tulangan U32 Ulir

Kg

Pasangan Batu

M3

7.10 (2)

Pasangan Batu Kosong

M3

7.13.(1)

Sandaran (Railing)

M1

7.9

DIVISI 8

(%)

PENGEMBALIAN KONDISI DAN PEK. MINOR

8.4 (1)

Marka Jalan Termoplastik

M2

8.4.(1) a

Marka Jalan Termoplastik

M2

8.4.(3a)

Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade

Buah

8.4.(6a)

Patok Kilometer

Buah

8.4.(6b)

Patok Hektometer / ROW

Buah

SKh-1.10a

BOBOT

PEMELIHARAAN KINERJA JALAN

1,970.62

8.44

1,970.62

8.44

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

MINGGU LALU

PEKERJAAN PEKERJAAN

VOLUME

BOBOT

(%) SKh.1.10.a ( 5 )

Lapis Pondasi Agregat Kelas B

M3

SKh.1.10.a ( 6 )

Lapis Pondasi Agregat Kelas S

M3

SKh.1.10.a ( 10 )

Campuran Aspal Panas

SKh.1.10.a ( 11 )

9.74

-

-

-

-

-

-

M3

8.45

1.17

-

-

Campuran Aspal Dingin

M3

-

-

-

-

SKh.1.10.a ( 12 )

Penetrasi Macadam

M3

-

-

-

-

SKh.1.10.a ( 17 )

Bahan Penutup ( sealent )

Kg

-

-

-

-

SKh.1.10.a ( 18 )

Pengendalian tanaman pada Rumija

Ls

1.00

4.28

0.67

2.85

SKh-1.10b

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 )

Pembersihan Jembatan

M2

SKh.1.10.a ( 3 )

Pengecatan Sederhana

M2

Perbaikan sandaran

M'

SKh.1.10.b ( 10 )

378.11

(%)

JUMLAH

Disetujui Oleh KOORDINATOR LAPANGAN

100.00

35.693

Diperiksa Oleh Konsultan Supervisi PT. ADIYA WIDYAJASA

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR MATA PEMBAYARAN

KONTRAK AWAL U R A I A N

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

( …………………………………………………… )

MINGGU LALU VOLUME

BOBOT (%)

Ir. TOTOK KUSMANTO Site Engineer

UAN ( RUTIN JALAN ) KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

(%)

KETERANGAN

BOBOT (%)

-

1,645.05

9.30

-

2,672.95

15.10

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

BOBOT (%)

KETERANGAN

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

(%)

KETERANGAN

BOBOT (%)

-

1,970.62

8.44

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%) -

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

0.67

2.85

-

35.693

RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : :

59.952 ( % ) 35.693 ( % ) (24.259) ( % )

DIBUAT OLEH KONTRAKTOR PT. DAMAI CITRA MANDIRI

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

KETERANGAN

BOBOT (%)

KOES WIDARYANTO, ST General Superintendent

LAPORAN MINGGUAN ( RUTIN JEMBATAN PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

DIVISI 1 1.2

UMUM Mobilisasi

Ls

Manajemen dan Keselamatan Lalu Lintas

LS

1.17

Pengamanan Lingkungan Hidup

LS

1.21

Manajemen Mutu

LS

1.8(1)

DIVISI 2

DRAINASE

2.1 (1)

Galian untuk Selokan Drainase dan Saluran Air

M3

2.2.(1)

Pasangan Batu dengan Mortar

M3

DIVISI 3

PEKERJAAN TANAH

3.1.(1a)

Galian Biasa

M3

3.1.(1a)a

Galian Biasa

M3

3.1.(1b)

Galian Batu Lunak

M3

3.1.(1b)a

Galian Batu Lunak

M3

3.2.(1a)

Timbunan Biasa dari Sumber Galian

M3

3.2.(1a)a

Timbunan Biasa dari Sumber Galian

M3

3.2.(2a)

Timbunan Pilihan dari Sumber Galian

M3

3.2.(2a)a

Timbunan Pilihan dari Sumber Galian

M3

MINGGU LALU VOLUME

BOBOT (%)

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

3,3.(1) DIVISI 4

Penyiapan Badan Jalan ( L = 7 m )

M2

PELEBARAN PERKERASAN DAN BAHU JALAN

4.2.2b

Lapis Pondasi Agregat Kelas S

M3

4.2.2ba

Lapis Pondasi Agregat Kelas S

M3

4.2.6

Bahan Aspal untuk Pekerjaan Pelaburan

Liter

DIVISI 5

PERKERASAN BERBUTIR

5.5.(1a)

Lapis CTB

M3

5.5.(1b)

Semen Untuk CTB

Ton

SKH 5.6.(1a)

Semen Untuk CTRB

Ton

SKH 5.6.(1b)

Lapis Cement Treated Base Recycler Base ( CTRB )

M3

DIVISI 6

PERKERASAN ASPAL

6.1 (1)(b)

Lapis Resap Pengikat - Aspal Emulsi

Liter

6.1 (2)(b)

Lapis Perekat - Aspal Emulsi

Liter

6.1 (2)(b)a

Lapis Perekat - Aspal Emulsi

Liter

MINGGU LALU VOLUME

BOBOT (%)

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

6.2 (1)

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

6.2 (1)a

Lataston Lapis Aus (HRS-WC) (gradasi senjang/semi senjang)

Ton

6.3(5a)

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

6.3(5a)a

Lataston Lapis Antara (HRS-Base) (gradasi senjang/semi senjang)

Ton

DIVISI 7

STRUKTUR

7.1 (7).a

Beton mutu sedang dengan fc’= 20 MPa

M3

7.1 (10)

Beton mutu rendah dengan fc’= 10 Mpa

M3

7.3 (1)

Baja Tulangan U24 polos

Kg

7.3 (3)

Baja Tulangan U32 Ulir

Kg

Pasangan Batu

M3

7.10 (2)

Pasangan Batu Kosong

M3

7.13.(1)

Sandaran (Railing)

M1

7.9

DIVISI 8

PENGEMBALIAN KONDISI DAN PEK. MINOR

8.4 (1)

Marka Jalan Termoplastik

M2

8.4.(1) a

Marka Jalan Termoplastik

M2

8.4.(3a)

Rambu Jalan Tunggal dng Permukaan Pemantul Engineer Grade

Buah

8.4.(6a)

Patok Kilometer

Buah

8.4.(6b)

Patok Hektometer / ROW

Buah

SKh-1.10a

PEMELIHARAAN KINERJA JALAN

MINGGU LALU VOLUME

BOBOT (%)

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR

KONTRAK AWAL

MATA

U R A I A N

PEMBAYARAN

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN

MINGGU LALU VOLUME

BOBOT

(%) SKh.1.10.a ( 5 )

Lapis Pondasi Agregat Kelas B

M3

SKh.1.10.a ( 6 )

Lapis Pondasi Agregat Kelas S

M3

SKh.1.10.a ( 10 )

Campuran Aspal Panas

M3

SKh.1.10.a ( 11 )

Campuran Aspal Dingin

M3

SKh.1.10.a ( 12 )

Penetrasi Macadam

M3

SKh.1.10.a ( 17 )

Bahan Penutup ( sealent )

Kg

SKh.1.10.a ( 18 )

Pengendalian tanaman pada Rumija

Ls

SKh-1.10b

(%)

PEMELIHARAAN KINERJA JEMBATAN

SKh.1.10.b ( 1 )

Pembersihan Jembatan

M2

24,034.62

48.42

11,647.35

23.47

SKh.1.10.a ( 3 )

Pengecatan Sederhana

M2

400.00

48.35

18.00

2.18

Perbaikan sandaran

M'

20.00

3.22

SKh.1.10.b ( 10 )

JUMLAH

Disetujui Oleh KOORDINATOR LAPANGAN

100.00

-

25.642

Diperiksa Oleh Konsultan Supervisi PT. ADIYA WIDYAJASA

PPK

: NANGA TAYAP - SEI. KELIK - KETAPANG

NAMA PAKET

: PRESERVASI REKONSTRUKSI JALAN DAN RUTIN JEMBATAN SEI. KELIK - SIDUK

NO. & TGL. KONTR: IK.02.04/PJN.WIL.I-KB/2018/03 - 12 JANUARI 2018 NO. & TGL. SPMK : SUMBER DANA

: APBN 2018

NOMOR MATA PEMBAYARAN

KONTRAK AWAL U R A I A N

VOL. Sat.

BOBOT

PEKERJAAN PEKERJAAN (%)

( …………………………………………………… )

MINGGU LALU VOLUME

BOBOT (%)

Ir. TOTOK KUSMANTO Site Engineer

AN ( RUTIN JEMBATAN ) KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

BOBOT (%)

KETERANGAN

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

BOBOT (%)

KETERANGAN

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

BOBOT (%)

KETERANGAN

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT

VOLUME

KETERANGAN

BOBOT

(%)

(%)

-

11,647.35

23.47

-

18.00

2.18

-

-

-

-

25.642

RENCANA PROGRESS REALISASI PROGRESS DEVIASI

: : :

58.629 ( % ) 25.642 ( % ) (32.987) ( % )

DIBUAT OLEH KONTRAKTOR PT. DAMAI CITRA MANDIRI

KONTRAKTOR

: PT. DAMAI CITRA MANDIRI

KONSULTAN SUPERVISI

: PT. ADIYA WIDYAJASA

MINGGU KE-

: 30

TANGGAL AWAL MGG INI

: 30 Juli 2018

TANGGAL AKHIR MGG INI

: 05 Agustus 2018

PRESTASI MINGGU INI VOLUME

S/D MINGGU INI

BOBOT (%)

VOLUME

KETERANGAN

BOBOT (%)

KOES WIDARYANTO, ST General Superintendent