Construction Update

Week of November 9, 2009

Men of Gamma, It has been about three weeks since our last update and it has been a BUSY three weeks. AKL Gamma is finally starting to rise out of the ground as the basement walls are now in place and work can soon begin on the framing of the new addition. Meanwhile in the original house, final prep work was complete and now sub flooring is being laid throughout most of the structure. Outside the house work has progressed on the drainage system around the perimeter of the house. While this has meant the loss of several trees and landscaping you can rest assured that in the end the house will have a remarkable presence from Fourth and Daniel. Next on the list are the major orders including windows, trusses, and much more. With carpenters just starting on the job, we fully expect the house to be tightened up and ready for interior buildout by Christmas. With all that has been happening I will end this note a little short and instead show you all of the changes in 401 East Daniel Street. All the Best,

T.J. Blakeman, On site Owner Representative Pledge Class of 1999 (217) 414-0630 or [email protected]

Foundation wall framing

Alpha Kappa Lambda

Completed foundation walls

Future Basement/Multi-Purpose Room

Elevator Pit

South facade from future basement

Insulation and backfilling of basement

View all of the construction photos (updated weekly) at www.aklgamma.com.

Interior Flooring and the start of framing If you plan to be in the Champaign-Urbana area and would like to tour the house, please contact T.J. Blakeman at (217) 403-8800 and we will schedule a visit.

We Still Need Your Help! Although work is underway we have met 90% of our funding goals we must continue our fundraising efforts to complete the project. We are hoping that as you see work underway, that you will feel confident in our progress to continue or begin making generous contributions.



                                                

To complete this project we need

$300,000 in hand by December 5, 2009 Visit www.aklgamma.com to contribute

It’s not to late to consider class gifts! Please think about joining with your pledge brothers and giving together. It would be a great way to show class unity. There is NO MINIMUM GIFT!

Connect with Alpha Kappa Lambda AKL Gamma has create a number of ways for you to stay in touch with us. Please take time to connect with us so we can keep you up to date with all of the changes at gamma.

www.aklgamma.com - Chapter website and Alumni Database Alpha Kappa Lambda - Gamma Chapter - on facebook @AKL_Gamma on Twitter Klaxon - Newsletter www.akl.org - National Fraternity Website

SAVE THE DATE GAMMA GRAND REOPENING WEEKEND October 1st - 3rd, 2010

Alpha Kappa Lambda

Gamma Chapter • 401 East Daniel Street Champaign, Illinois 61820

Related Documents